{"document":{"slug":"rec-20261027-0003","title":"Petition for Review filed in the U.S. Court of Appeals for the Third Circuit of Exelon Corp., et al. re 12/18/2025, 02/20/2026, 06/18/2026, and 08/20/2026…","issued":"2026-10-27","accession":"20261027-0003","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"EXELON CORPORATIONAMERICAN TRANSMISSION SYSTEMS, INCORPORATEDJERSEY CENTRAL POWER & LIGHT COMPANY ,KEYSTONE APPALACHIAN TRANSMISSION COMPANY ,MID-ATLANTIC INTERSTATE TRANSMISSION LLC ,MONONGAHELA POWER COMPANY ,THE POTOMAC EDISON COMPANY ,TRANS-ALLEGHENY INTERSTATE LINE COMPANY ,APPALACHIAN POWER COMPANY ,INDIANA MICHIGAN POWER COMPANY ,KENTUCKY POWER COMPANY ,KINGSPORT POWER COMPANY ,OHIO POWER COMPANY ,WHEELING POWER COMPANY ,AEP APPALACHIAN TRANSMISSION COMPANY INC ,AEP INDIANA MICHIGAN TRANSMISSION COMPANY, INC. ,AEP KENTUCKY TRANSMISSION COMPANY INC ,AEP OHIO TRANSMISSION COMPANY INC ,AEP WEST VIRGINIA TRANSMISSION COMPANY INC ,THE DAYTON POWER AND LIGHT COMPANY DBA AES OHIO ,VIRGINIA ELECTRIC AND POWER COMPANY D/B/A DOMINION ENERGY VI ,DUQUESNE LIGHT COMPANY ,EAST KENTUCKY POWER COOPERATIVE, INC. ,PPL ELECTRIC UTILITIES CORPORATION ,ROCKLAND ELECTRIC COMPANY ,","kind":"filing","file":"sources/filings/text/20261027-0003_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261027-0003","tier":"record","sha256":"c9366937e16f1b34585b384f205ca9ef2aa09dd1bb80e09773fe65073f4883e4","pages":224,"tokens":72774,"emptyPages":[],"textThemes":["colo","study","flex","cost"]},"pages":[{"page":1,"startToken":0,"endToken":405,"text":"Document Accessig-P SP; 2QI:236-18 - 3g Wu men t:Filla EPAg9: g69,48/2pge Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 135 - \n268.\nFinally, we note that DCC's concerns regarding the terms and conditions of \nInterim NITS are misplaced arguments about the illustrative tariff PJM submitted in the \npaper hearing and are discussed in Part VI.H. \nC. \nNecessary Studies  \n1. \nDecember Order \n269.\nThe Commission directed PJM to revise the Tariff to clarify that an existing \nInterconnection Customer seeking to modify its ISA or GIA to allow its generator to \nserve Co-Located Load, including to reflect any reduction in its CIRs, must follow the \nNecessary Study process to effectuate such Co-Location Arrangement.647  In addition, the \nCommission directed PJM to add to the Tariff a description of the scope of the analysis \nthat it will perform as part of the Necessary Study process when an Interconnection \nCustomer seeks to use its existing generator to serve Co-Located Load, consistent with \nPJM's discussion of how it conducts necessary studies associated with Interconnection \nCustomers seeking to amend their ISAs or GIAs to use existing generators to serve \nCo-Located Load, including to reflect any reduction in CIRs. The Commission found \nthat PJM must include a description of the information that the Interconnection Customer \nmust provide about the Co-Located Load for the purposes of the Necessary Study, and \nthat the Necessary Study process must assess any special protection scheme that is part of \na Co-Location Arrangement.648 \n270.\nThe Commission directed PJM to revise the Tariff to indicate that the \nInterconnection Customer will be responsible for the costs of any modifications or \nNetwork Upgrades that are needed as a result of PJM's study of the change to the ISA or \nGIA to allow the existing generator to serve Co-Located Load, including to reflect any \nreduction in CIRs, inclusive of all necessary Network Upgrades.649  The Commission \nfound that the Tariff should make clear that an existing generator may not commence \nservice to a Co-Located Load until all required Network Upgrades, special protection \nschemes, and metering are in service.650  Finally, the Commission clarified that an \nexisting generator may not begin serving Co-Located Load that is not Network Load until \nrequiring the compliance filing constitute a collateral attack on the order requiring the \ncompliance filing.\"). \n647  December Order, 193 FERC ¶ 61,217 at P 226. \n648 Id. P 227. \n649 Id. P 228. \n650 Id \n292 of 515"},{"page":2,"startToken":405,"endToken":757,"text":"Document Accessigi \n.Eqr2-W1 8-3RE6Unlent:Filtd EPAg:glig8/ 2PAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 136 - \nit has delisted its CIRs for the portion of the generator to be designated to serve any \nCo-Located Load that is not receiving NITS.65' \n2. \nPJM Compliance Filing \n271.\nPJM states that it proposes changes to Parts III and VIII of the Tariff to comply \nwith the Commission's directives regarding the Necessary Study process for existing \nInterconnection Customers, including clarifying that customers must enter into a \nNecessary Study Agreement with PJM.652  PJM also proposes to require customers to \nprovide PJM with all information needed to perform the Necessary Studies, which PJM \nproposes to detail in the PJM manuals.653  PJM states that a Project Developer may not \nmake changes to its facilities until it has completed the Necessary Study process and the \namended GIA is effective. PJM proposes that the Tariff state that Necessary Studies to \nbe performed include thermal, short circuit, and stability studies under various seasonal \nand load conditions, as detailed in the PJM manuals, and assess any necessary control \ntechnologies and protection systems required. Lastly, PJM states that the Tariff will \nrequire the Project Developer to be responsible for the cost of any modifications or \nNetwork Upgrades necessary as a result of an Interconnection Customer's decision to \nserve the Co-Located Load.654 \n272.\nPJM clarifies that these changes apply to all existing interconnection customers, \nregardless of whether they have effective interconnection agreements issued pursuant to \nParts IV, VI, VII, or VIII of the Tariff.655  PJM states that, should an interconnection \ncustomer not have a three-party interconnection agreement involving PJM, the customer \nwould need to first convert to a three-party agreement before following the Necessary \nStudy process. \n3. \nPleadings  \n273. A number of parties have concerns with PJM's compliance filing. Several parties \nprotest PJM's compliance filing and urge the Commission to require PJM to establish \n651  Id. P 230. \n652 Compliance Transmittal at 24-25. \n653  Id. at 25 (citing December Order, 193 FERC ¶ 61,217 at P 227). \n654  Id at 25-28. \n655  Id. at 24-25. \n293 of 515"},{"page":3,"startToken":757,"endToken":1169,"text":"Document AccessiggSg 4q1AeR18-3P6)9Unlent:Filld raq99: ge9A912pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 137 - \ndeadlines to complete the Necessary Study process.656  Constellation urges the \nCommission to direct PJM to detail the specific provisions in the PJM manuals to which \nthe proposed Tariff language refers because it does not specify whether PJM is proposing \nto use the existing Necessary Study process or a new process, and the existing \nrequirements set forth in PJM Manual 14C do not specifically reference the studies to be \nperformed. Crusoe and Constellation urge the Commission to direct PJM to revise the \nproposed Tariff's scope'of the analysis to explicitly relate to reliability impacts only, \nrather than impacts generally.657  Crusoe contends that PJM should create a clear, \npublished standard for what triggers the Necessary Study process. \n274.\nEnergy Artisans argue that PJM's proposed Necessary Study requirements will \nforce industrial users to fund thermal, short circuit, and stability studies and bear the costs \nof Network Upgrades, control technologies and protection systems, and redundant \nmetering equipment identified during these studies. Energy Artisans allege that these \nrequirements will force many industrial facilities to cease operations, which will lead to \nhigher Network Loads and exacerbate resource adequacy issues in PJM.658 \n275.\nVistra and Constellation request that PJM clarify how the proposed Tariff \nrevisions describing the Necessary Study process would apply to interconnection \ncustomers who have already submitted requests and are undergoing studies. \nConstellation and Vistra assert that Co-Location Arrangements will face significant \ndelays if they must reenter the Necessary Study process.659  Vistra maintains that PJM's \nfailure to include a transition mechanism is an unjustified departure from the \nCommission's approach to interconnection reform, in which the Commission has \nregularly required transition mechanisms to avoid disruption and stranded investments.66° \nConstellation proposes to clarify that Project Developers with existing requests for \nNecessary Studies for Co-Location Arrangements will be allowed to rely on the results of \nthose studies to the extent relevant in light of the transmission service the Eligible \n656  Constellation Protest and Comments on Compliance Filing at 12, 17; DCC \nComments on Compliance Filing at 7; Crusoe Comments on Compliance Filing at 9. \n657  Constellation Protest and Comments on Compliance Filing at 12-14; Crusoe \nComments on Compliance Filing at 9. \n658  Energy Artisans Protest of Compliance Filing at 1-2. \n659  Constellation Protest and Comments on Compliance Filing at 15; Vistra Protest \nof Compliance Filing at 4, 6-8. \n660 Vistra Protest of Compliance Filing at 4-5. \n294 of 515"},{"page":4,"startToken":1169,"endToken":1588,"text":"Document Acces sig@SA: 22q-2-W.8- 34PCument:Fl il d \n@g9: g.,39A 8/2  pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 138 - \nCustomer plans to request on behalf of the Co-Located Load.661  Constellation and Vistra \nargue that requiring interconnection customers to restart the process would be \ninconsistent with the filed-rate doctrine and rule against retroactive ratemaking and \nwould effectively penalize parties for failing to comply with rules that did not exist at the \ntime they acted.662 \n276.\nVistra contends that PJM neither justifies its proposal to require interconnection \ncustomers with older interconnection agreements to enter into the new pro forma GIA \nnor shows how this proposal is consistent with the Commission's directives. Vistra \nsuggests that this proposal is unrelated to the Commission's compliance directives and \nrequests clarity about when the interconnection customer needs to enter into the new GIA \nin the Necessary Study process. Vistra also asserts that PJM's proposal could result in \ndisputes about whether and how provisions in the updated pro forma GIA apply to older \ngenerators, disrupting long-standing Commission precedent. Separately, Vistra indicates \nthat, because PJM locates Necessary Study revisions in Part VIII, which applies to New \nService Requests on or after October 1, 2021, it is unclear whether interconnection \ncustomers that entered the interconnection process before that date may use the \nNecessary Study process.663 \n277.\nJoint Parties argue that PJM should be required to clarify that an existing \ninterconnection customer can nominate a joint withdrawal limit in the Necessary Study \nprocess.664  Joint Parties argue that this clarification is necessary to realize the December \nOrder's stated intent of ensuring that Co-Located Loads do not pay for services that they \ndo not use and do not trigger Network Upgrades that they do not need.665  Joint Parties \nargue that PJM's proposed Tariff revisions appear to remain silent as to how it will treat \nenergy withdrawals in studying Co-Located Load interconnection requests. Joint Parties \nstate that they seek modest clarifications from PJM that, to the extent PJM performs \ninterconnection study steps involving withdrawal assumptions for Co-Located Loads, an \nenergy storage interconnection customer will be able to specify limits to the injection and \n661  Constellation Protest and Comments on Compliance Filing at 14-15. \n662  Id at 15; Vistra Protest of Compliance Filing at 4, 6. \n663  Vistra Protest of Compliance Filing at 14-16. \n664  Joint Parties Protest of Compliance Filing at 4-6. See also Earthjustice Reply \nBrief at 22. \n665  Joint Parties Protest of Compliance Filing at 4-5. \n295 of 515"},{"page":5,"startToken":1588,"endToken":2012,"text":"Document Accessig#SA: 2A2-1§Al 8 - 31:Aument:Flild  &qg9: e269A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 139 - \nwithdrawal rights reflecting the proposed integration of the storage and Co-Located Load \nfacilities.666 \n278.\nParties argue that PJM's proposal for delisting CIRs may be unjust, unreasonable, \nunduly discriminatory, or inconsistent with the Commission's directives in the \nDecember Order. Vistra claims that PJM's proposal would require existing generators to \nprovide PJM with the amount of reduction to CIRs to facilitate the Co-Located Load \nconfiguration, which Vistra argues is vague and potentially overbroad because it could be \nread to require that generators include in their CIR reduction any portion of a facility that \nwill ever provide power to a Co-Located Load. Vistra and DCC express concern that \nPJM's proposal could require generators to delist more CIRs than necessary. 667  Vistra \nfurther contends that allowing secondary units to provide occasional, interruptible service \nto Co-Located Load and to retain their CIRs would be consistent with the Tariff. Vistra \nand Constellation argue that capacity resources that serve Co-Located Load on an \ninterruptible basis should not be required to delist CIRs.668  Vistra presents an additional \nconcern with PJM's proposal for reducing CIRs, namely, that PJM fails to explain how it \nwill assess the impact of the reduction of CIRs.669  Vistra alleges that because PJM's \nproposal is vague on this point, PJM could, for example, improperly incorporate resource \nadequacy considerations into its Necessary Study process. \n4. \nDetermination \n279.\nWe find that PJM's proposed revisions to its Necessary Study process partially \ncomply with the directives set forth in the December Order and therefore accept the \nTariff revisions in part, reject them in part, and direct a further compliance filing as \ndiscussed below. \n280.\nWe accept PJM's proposed revisions to Part VIII, Subpart A, section 401 and \nPart IX, Subpart G of the Tariff to comply with the directives in the December Order by: \n(1) adding a description of the scope of the analysis that it will perform as part of the \nNecessary Study process when an Interconnection Customer seeks to use its existing \ngenerator to serve Co-Located Load; (2) requiring the Interconnection Customer to be \nresponsible for the costs of any modifications or Network Upgrades that are needed as a \n666  Id at 5. \n667  Vistra Protest of Compliance Filing at 8-10; DCC Comments on Compliance \nFiling at 7. \n668  Vistra Protest of Compliance Filing at 11; Constellation Protest and Comments \non Compliance Filing at 19. \n669  Vistra Protest of Compliance Filing at 12. \n296 of 515"},{"page":6,"startToken":2012,"endToken":2519,"text":"Document A„essigPA\n:  2q-Agg18-349curnent:Flild rEN9:43/3.8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 140 - \nresult of PJM's study of the change to the ISA or GIA to allow the existing generator to \nserve Co-Located Load, including to reflect any reduction in CIRs, inclusive of all \nnecessary Network Upgrades; and (3) clarifying that an existing generator may not \ncommence service to a Co-Located Load until all required Network Upgrades, special \nprotection schemes, and metering are in service.670  We also accept PJM's proposed \nrevisions to Part IX, Subpart A, Form of Application and Studies Agreement to facilitate \nPJM's collection of the information necessary to perform requested Necessary Studies.671 \nHowever, with respect to Constellation's argument that PJM's proposed Tariff revisions \nmay lack clarity, we direct PJM to specify in its compliance filing what types of \nadditional detail about the studies will be available in the PJM manuals. \n281. We also note in response to Constellation that, per the December Order, PJM's \nproposal seeks to clarify the existing Necessary Study process, not create a new one.672 \nWhile parties request that the Commission establish deadlines for the Necessary Study \nprocess, we note the December Order did not include any such requirement, and our \nreview of these proposed Tariff revisions is limited to whether PJM complies with the \ndirectives in the December Order.673  In response to parties' requests regarding the trigger \nand scope of the Necessary Study process, we note that the Commission in the December \nOrder directed PJM to clarify its study procedures for an Interconnection Customer that \nwill use its generator to serve Co-Located Load but did not otherwise direct changes to \nthe trigger or scope of the Necessary Study process. Per the Tariff, the scope of the \nNecessary Study is to determine whether planned modifications to an Interconnection \nCustomer's facilities \"will have a permanent material impact on the Transmission System \nand to identify the additions, modifications, or replacements to the Transmission System, \n670 December Order, 193 FERC ¶ 61,217 at PP 227-228. We also accept the \nconforming edit to the definition of Necessary Study in Proposed Tariff, § VII.A 300, \nDefinitions N (3.0.0) and § VIII.A 400, Definitions N (4.0.0). \n671  Compliance Transmittal at 27; PJM, Proposed Tariff, pt. Ix, subpt. A, (Form of \nApplication and Studies Agreement) (4.0.0). \n672  See Compliance Transmittal at 25 (\"The thrust of PJM's proposed revisions \nrequire any Existing Interconnection Customer that seeks to serve Co-Located Load to \nfollow a clarified necessary study process detailed in Part VIII of the Tariff and the \nrelated Form of Necessary Study Agreement set forth in Tariff, Part IX, Subpart G.\"). \n673  See, e.g., PJM Interconnection LLC, 119 FERC ¶ 61,179, at P 12 (2007) (\"The \npurpose of a compliance filing is to make the directed changes and the Commission's \nfocus in reviewing them is whether they comply with the Commission's previously stated \ndirectives.\") (citing AES Huntington Beach, LLC, 111 FERC ¶ 61,079, at P 60 & n.25 \n(2005)). \n297 of 515"},{"page":7,"startToken":2519,"endToken":2967,"text":"Document AccessigPsA qq23.6g-18 _31:29cument:Flil d IEN9:(269A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 141 - \nif any, that are necessary, in accordance with Good Utility Practice, and/or to maintain \ncompliance with Applicable Laws and Regulations or Applicable Standards, to \naccommodate the planned modifications.\"674  Regarding Joint Parties' requests regarding \nstudy processes for Co-Located Loads paired with electric storage resources, we note that \nthe December Order did not address or otherwise direct changes as to any generator \ninterconnection study procedures for such resources. \n282.\nWe reject in part PJM's proposed revisions to Part III of its Tariff regarding the \nrequirement for Interconnection Customers with effective ISAs pursuant to Part VI of the \nTariff or effective GIAs pursuant to Part VII of the Tariff to enter into a new GIA \npursuant to Part VIII of the Tariff and the pro forma GIA in Part IX, Subpart B. We \nagree with Vistra that such a requirement is inconsistent with the Commission's \nrecognition in the December Order that existing Interconnection Customers that seek to \nmodify their ISAs or GIAs must follow the Necessary Study process to effectuate a \nCo-Location Arrangement.675  Interconnection Customers with effective ISAs or GIAs \nmust be able to modify those agreements and undergo the Necessary Study process \nwithout entering into new GIAs. \n283.\nWe also agree with protesters that PJM's proposed revisions lack clarity with \nrespect to how they apply to Interconnection Customers that have already executed \nNecessary Study Agreements and for which PJM has already completed Necessary \nStudies.676  The Commission found in the December Order that the Necessary Study \nprocess lacked sufficient clarity and directed PJM to add the scope of the analysis it \nperforms as part of the Necessary Study process to its Tariff.677  However, the \nCommission did not direct changes to the scope of the study, and PJM does not otherwise \ndemonstrate why Interconnection Customers seeking to serve Co-Located Load cannot \n674  PJM, Intra-PJM Tariffs, pt. WILA, § 400 (Definitions N) (2.0.0) (definition of \nNecessary Study). \n675  December Order, 193 FERC ¶ 61,217 at P 226 (\"[W]e direct PJM to submit, \nwithin 60 days of the date of issuance of this order, a compliance filing to revise the \nTariff to clarify that an existing Interconnection Customer seeking to modify its ISA or \nGIA to allow its generating facility to serve Co-Located Load, including to reflect any \nreduction in its CIRs, must follow the necessary study process to effectuate such \nCo-Location Arrangement.\") (emphasis added). \n676  Constellation Protest and Comments on Compliance Filing at 15; Vistra Protest \nof Compliance Filing at 4, 6. \n677  December Order, 193 FERC ¶ 61,217 at P 227. \n298 of 515"},{"page":8,"startToken":2967,"endToken":3453,"text":"Document AccessigPSA: 2A-2-VA18- 3499u me nt:F1 Ad riDag \n8/2PPe Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 142 - \nrely on the results of Necessary Studies that have already been performed if the scope of \nthe study has not changed. \n284.\nFor these reasons, we direct PJM to submit a compliance filing within 60 days of \nthe date of issuance of this order to remove the requirement for Interconnection \nCustomers with existing ISAs pursuant to Part VI of the Tariff and GIAs pursuant to \nPart VII of the Tariff to enter into a new pro forma GIA. We recognize that removing the \nrequirement for Interconnection Customers with existing ISAs pursuant to Part VI of the \nTariff and GIAs pursuant to Part VII of the Tariff to enter into a new pro forma GIA will \nnecessitate duplicating the appropriate Necessary Study Tariff provisions (Part VIII, \nSubpart A, section 401.H.3) in those Tariff sections, and therefore we direct PJM to \ninclude these Tariff revisions in its compliance filing. We find that this directive will \nensure that Interconnection Customers with effective ISAs or GIAs will not be required \nto enter into new GIAs if they seek to modify their ISA or GIA to allow their generator to \nserve Co-Located Load. \n285.\nWe also direct PJM to explain in its compliance filing how its changes ensure the \nprohibition on Interconnection Customers serving Co-Located Loads from existing \ngenerators until all required Network Upgrades, necessary control technologies and/or \nprotection systems, and metering identified as necessary are complete and in service, \napplies to Interconnection Customers with currently effective GIAs, ISAs, and Necessary \nStudy Agreements, in addition to Interconnection Customers seeking new Necessary \nStudy Agreements and GIAs. \n286.\nIn response to Constellation's request that the Commission clarify that \nInterconnection Customers with existing requests for Necessary Studies for Co-Location \nArrangements may rely on the results of those studies to the extent relevant in light of the \ntransmission service the associated Eligible Customer plans to request on behalf of the \nCo-Located Load, we clarify that the studies applicable to a transmission service request \nfor one of the new transmission services are distinct from the Necessary Study process, \nwhich studies the modification of a generator interconnection. If an Eligible Customer \nseeks to take one of the new transmission services on behalf of Co-Located Load, it must \nrequest transmission service and follow the appropriate transmission service study \nprocedures as directed in this order. \n287.\nWith respect to Energy Artisans' argument that requiring industrial users to bear \nthe costs of modifications or Network Upgrades will force industrial facilities to cease \noperations and exacerbate resource adequacy issues in PJM, we dismiss this argument as \nan untimely request for rehearing of the December Order's finding that PJM's existing \nretail BTMG netting rules were no longer just and reasonable.678  We reiterate that the \n678  Id P 221; see supra P 232 & n.585. \n299 of 515"},{"page":9,"startToken":3453,"endToken":3812,"text":"Document AccessigPSA 22q-Ag1.8 _3RWLIment:Flitd  rpAg: AO/g8/2 \ne Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 143 - \nrequirement to be responsible for costs of modifications or Network Upgrades applies \nonly to Interconnection Customers that seek to modify their ISA or GIA to allow their \ngenerator to serve Co-Located Load, and this is a clarification of existing Tariff \nprovisions in the pro forma ISA and GIA, as explained above.679  Interconnection \nCustomers may choose to maintain their current ISAs or GIAs with no modifications, and \nInterconnection Customers who do not wish to bear these costs may choose not to pursue \nCo-Location Arrangements. \n288. Consistent with our above discussion, we disagree with Vistra and Constellation \nthat capacity resources should not have to reduce their CIRs to serve Co-Located Load.680 \nWe also reject without prejudice PJM's proposed Tariff, Part IX, Subpart G, Form of \nNecessary Studies Agreement, because PJM has proposed changes to the Cost \nResponsibility section without explanation.681 \nD. \nOther \n1. \nDecember Order  \na. \nDefinition of Co-Located Load \n289. In the December Order, the Commission directed PJM to adopt the definition of \nCo-Located Load specified in the order: \"a configuration that refers to end-use customer \nload that is physically connected to the facilities of an existing or planned Customer \nFacility on the Interconnection Customer's side of the Point of Interconnection to the \nPJM Transmission System.\"682 \nb. \nGeneration Interconnection Procedures, pro forma GIA, \nand Common Service Provisions  \n290. The Commission also directed PJM to revise its Tariff, VIII, Subpart B, \nsection 403 - Application Rules to add to the list of requirements for a New Service \n679  Tariff, Intra-PJM Tariffs, OATT, Attachment O, Appendix 2, § 3.4(b) \nModification Costs (0.0.0); id., Part IX.B, Appendix 2, § 3.4(b) Modification Costs \n(2.0.0). \n688  See supra Part IV.C.2.a.iii. \n681 PJM,\n \nProposed Tariff, pt. IX, subpt. G (Form of Necessary Studies Agreement) \n(3.0.0), § 15 (Cost Responsibility). Specifically, PJM proposes to raise the initial deposit \nfor the Necessary Studies from $25,000 to $50,000. \n682  December Order, 193 FERC ¶ 61,217 at P 164. \n300 of 515"},{"page":10,"startToken":3812,"endToken":4183,"text":"Document AccessigPSg 4 -2-Y%q18-3QKUrnent:Filtd IPACW A0A 8 / 2PAe Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 144 - \nRequest that an Interconnection Customer who will use its generator to serve Co-Located \nLoad must specify an Eligible Customer who will take transmission service on behalf of \nthe Co-Located Load.683  The Commission further directed PJM to submit revisions to the \ngeneration interconnection procedures to specify any operational procedures or data \nexchange requirements that PJM deems necessary for Co-Location Arrangements to \nremedy the Tariff deficiencies, such as unique operational procedures and data exchange \nrequirements.684  The Commission noted that these revisions would establish a \nrequirement in the Tariff for the Eligible Customer to be charged for transmission and \nancillary services that the Eligible Customer must take on behalf of the Co-Located Load. \nThe Commission clarified that, should an Interconnection Customer wish to serve \nCo-Located Load using its generator but not identify an Eligible Customer, then the \nInterconnection Customer may take steps to terminate its generator's interconnection to \nthe PJM transmission system and serve the Co-Located Load fully islanded from PJM's \ntransmission system.685 \n291.\nThe Commission also directed revisions to the Tariff, Part IX, Subpart B GIA to \nspecify that an Interconnection Customer that will use its generator to serve Co-Located \nLoad must specify an Eligible Customer that will take transmission service on behalf of \nthe Co-Located Load.686  The Commission directed PJM to add a new provision to Part I, \nCommon Service Provisions, of the Tariff that requires Interconnection Customers with \nISAs or GIAs executed, or requested to be filed unexecuted, prior to the effective date of \nthe revised generation interconnection procedures and pro forma GIA directed in this \norder that wish to add Co-Located Load or are currently serving Co-Located Load to \npublicly notify PJM of that addition and identify the Eligible Customer that will take \ntransmission service on behalf of that Co-Located Load. \n2. \nPJM Compliance Filing \na. \nDefinition of Co-Located Load  \n292.\nOn April 16, 2026, the Commission issued an order rejecting the portion of PJM's \nfirst compliance filing proposing to define Co-Located Load in a manner that deviated \n6831d. P188. \n684 Id. P 188 & n.405. \n685Id P 189. \n686 Id. P 190. \n301 of 515"},{"page":11,"startToken":4183,"endToken":4555,"text":"Document Accessig \nqq-2y:6-18 _39e9Liment:FlAd rpaqg9: A0A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. - \n- 145 - \nfrom the December Order, without sufficient explanation, by replacing the term \"Point of \nInterconnection\" with \"Point of Change in Ownership.\"687 \n293. In the instant filing, PJM states that it proposes modifying the definition of \nCo-Located Load directed by the Commission in the same manner as proposed in PJM's \nfirst compliance filing.688  PJM states that changing \"Point of Interconnection\" to \"Point \nof Change in Ownership\" is consistent with or superior to the December Order's directive \nbecause it provides additional clarity to interconnection parties, is easier to administer, \nand reduces litigation potentia1.689  PJM further explains \"[w]hile Point of Change in \nOwnership describes where a developer's portion of the Interconnection Facilities \nconnect to the Transmission Owner's portion of the Interconnection Facilities, Point of \nInterconnection is a technical and physical term about `where' those Interconnection \nFacilities connect to the PJM Transmission System.\"69°  PJM states that the Commission \nhas broad authority to establish the replacement rate under FPA section 206 and that \"one \nstakeholder's conditional protest in Docket No. ER26-1088 offers another alternative for \nthe Commission to consider in reliance on this Commission authority.\"691  PJM explains \nthat \"Point of Change in Ownership\" will reduce litigation because parties \"know what \ninterconnection facilities they own and can plan the connection of Co-Located Load to \nsuch facilities accordingly\" but that the protest in Docket No. ER26-1088 \"does not \nappear inconsistent with recognizing the principle that Co-Located Loads should only \ninterconnect to a Project Developer's portion of the Interconnection Facilities.\"692  PJM \nnotes that under the GIP, the Project Developer's Interconnection Facilities are the \nInterconnection Facilities between a Generating Facility and the Point of Change in \nOwnership, and include the facilities and equipment and any modification to those \nfacilities and equipment that are necessary to physically and electrically interconnect the \nGenerating Facility.693 \n687  PJM Interconnection, L.L.C., 195 FERC ¶ 61,030 (2026). \n688 Compliance Transmittal at 31 (citing PJM, Transmittal, Docket \nNo. ER26-1088-000, at 3 n.14 (filed Jan. 20, 2026)). \n689  Id. at 31-32. \n690  Id at 32. \n69  Id at 33. \n692  Id. at 33-34. \n693  Id at 34-35. \n302 of 515"},{"page":12,"startToken":4555,"endToken":5033,"text":"Document AccessigPS:: 2A-Aetg18 _ 3RKUrnellt:Flild \nAO/4 8 / 2 ;12*e Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 146 - \nb. \nGeneration Interconnection Procedures, pro forma GIA, \nand Common Service Provisions  \n294.\nPJM states that it proposes the prescriptive clarifications directed in the December \nOrder. PJM explains that the proposed Tariff revisions comply by: (1) adding to the list \nof requirements for a New Service Request that an Interconnection Customer who will \nuse its generating facility to serve Co-Located Load must specify an Eligible Customer \nwho will take transmission service on behalf of the Co-Located Load,694  (2) explaining \nthat if an Interconnection Customer wants to serve Co-Located Load but not identify an \nEligible Customer, then it may take steps to terminate its generating facility's \ninterconnection and serve the Co-Located Load fully islanded from PJM's transmission \nsystem,695  (3) explaining that these requirements apply to all Interconnection Customers \nrequesting to interconnect generating facilities to serve Co-Located Load,696  (4) creating \na new schedule in the pro forma GIA in the form of a placeholder to specify operational \nprocedures or data exchange requirements as may be required,697  and (5) revising the \npro forma GIA to reflect the requirement to specify an Eligible Customer that will take \ntransmission service on behalf of the Co-Located Load.698 \n295.\nIn addition, PJM states that it complies with the requirement to add a transition \nmechanism for existing customers that wish to add Co-Located Load by including the \ntransition mechanism in (1) the definition of Co-Located Generating Facility in Part I of \nthe Tariff, (2) Part III (NITS), and (3) the definition of Co-Located Generating Facility699 \n694  Id. at 28 (citing PJM, Proposed Tariff, pt. VIII, subpt. B, § 403 (4.0.0), \n§ 403(1)(r)). \n695  Id. at 29 (citing PJM, Proposed Tariff, pt. VIII, subpt. B, § 403 (4.0.0), \n§ 403 (1)(r); Proposed Tariff, Part III (NITS) (4.0.0)). \n696 Id. (citing PJM, Proposed Tariff, pt. VIII, subpt. B, § 403 (4.0.0), § 403(1)(r); \nProposed Tariff, Part III (NITS) (4.0.0)). \n697  Id. (citing PJM, Proposed Tariff, pt. IX.B (GIA), (0.0.0), Schedule O). \n698  Id. (citing PJM, Proposed Tariff, pt. IX.B (GIA), (0.0.0), Schedule O). \n699  PJM proposes the following definition of a Co-Located Generating Facility: \n\"an existing or planned Generating Facility that is physically connected to a Co-Located \nLoad. Any Generation Project Developer with an effective Service Agreement that plans \nto use a Generating Facility to serve Co-Located Load must provide PJM and the \nTransmission Owner with advance written notice to begin the Necessary Studies process \nprovided in Tariff, § VIII.A 401(H)(3)(b). If such a Generation Project Developer has an \neffective Interconnection Service Agreement pursuant to Tariff, Part VI or a Generation \nInterconnection Agreement pursuant to Tariff, Part VII, such agreement must be \n303 of 515"},{"page":13,"startToken":5033,"endToken":5413,"text":"Document AccessigIP; 22q-Aqq18 _3P9cUrnerlt:FlAd rPa g9:A-0,/18/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 147 - \nin Part VIII, Subpart A, section 400 of the Tariff. PJM asserts that these proposed \nrevisions to the Tariff are \"superior to or consistent with the Commission's directive \nbecause it promotes tariff readability and usability.\"700 \nc. \nDefinition of Non-Retail BTMG \n296.\nPJM states that it is also seeking to avoid any inadvertent changes to the \nsubstantive rules pertaining to Non-Retail BTMG.701  For this reason, PJM proposes to \nadd clarifying language in Tariff, Part III, section 34.3 providing that \"The daily load of a \nNetwork Customer does not include load served by operating Non-Retail Behind The \nMeter Generation.\"702  PJM states that this insertion preserves the status quo on this issue \nfor Non-Retail BTMG. \n3. \nPleadings  \na. \nDefinition of Co-Located Load \n297.\nConstellation urges the Commission to reject PJM's proposal to replace the term \n\"Point of Interconnection\" in the definition of Co-Located Load with the \"Point of \nChange in Ownership.\"703  Constellation argues that changing the specific definition of \nCo-Located Load already approved by the Commission in the December Order is outside \nthe scope of compliance. Constellation asserts that Point of Change in Ownership is not a \ndefined physical point and may lead to delays or discrimination against certain \nCo-Location Arrangements. Constellation states that, alternatively, if the Commission \naccepts PJM's proposed definition of Co-Located Load, it should (1) direct PJM to revise \nits Tariff to provide that PJM will determine the Point of Change in Ownership if parties \ncannot agree; (2) establish deadlines for parties to mutually agree to, or for PJM to \ndetermine, the location for Point of Change in Ownership; (3) ensure that the location \nselected for the Point of Change in Ownership does not eliminate the load from being \nCo-Located Load unless the Project Developer and Co-Located Load desire it; and \nsuperseded by a Generation Interconnection Agreement pursuant to Tariff, Part VIII and \nthe pro forma GIA in Part IX, Subpart B.\" PJM, Proposed Tariff, § VII.A 300 \n(Definitions C) (4.0.0); § VIII.A 400, Definitions C (4.0.0). \n700 Compliance Transmittal at 29-30. \n\"1  Id at 16. \n702 Id  \n703 Constellation Protest and Comments on Compliance Filing at 2. \n304 of 515"},{"page":14,"startToken":5413,"endToken":5779,"text":"Document AccessigPSA 2AAZI.8-3Wcument:Flild rpaqgp: APA812PAe Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 148 - \n(4) not tolerate any discrimination or delay and use its enforcement authority or other \nmechanisms to ensure non-discriminatory open access.704 \n298.\nConstellation asserts that recent experience has borne out the concern raised in its \ninitial protest that PJM's deviation from the Commission's definition of Co-Located \nLoad will allow transmission owners to effectively block Co-Location Arrangements.7°5 \nConstellation states that a transmission owner recently notified Constellation that it \nwould not study Constellation's proposed design for a Co-Location Arrangement unless \nConstellation agreed to transfer ownership of certain facilities to the transmission owner, \nwhich would mean that the load would no longer be on the generator's side of the Point \nof Change in Ownership.706  Constellation argues that, by conditioning the load's \ninterconnection on the transmission owner's ownership of those facilities, the \ntransmission owner would prohibit Constellation's ability to host Co-Located Load at the \nsite and limit the ability of the Co-Located Load to access the transmission services \nadopted in the December Order. \n299.\nVistra requests that the Commission reject PJM's use of \"Point of Change in \nOwnership\" in its proposed definition of Co-Located Load.707  Vistra argues that PJM's \nproposed revision to the definition of Co-Located Load creates uncertainty and an \nopportunity for transmission owners to unduly discriminate against certain customers. \nVistra requests that, if the Commission accepts PJM's proposed definition, then the \nCommission should direct further compliance to prevent undue discrimination.708 \n300.\nEnergy Artisans oppose PJM's definition of Co-Located Load and its use of Point \nof Change in Ownership rather than Point of Interconnection as arbitrary and a pretext for \ncost shifting.709  Energy Artisans allege that the definition \"is strategically designed to \nshrink the legal definition of the facility boundary, thereby capturing more load for \ngrid-service billing and excluding it from the BTMG actual use category.\"71° \n7°4  Id. at 3-5, 7-8. \n7°5  Constellation Supplemental Protest of Compliance Filing at 2. \n7°6  Id. at 3. \n7°7  Vistra Protest of Compliance Filing at 17. \n708  Id. at 18-19. \n7°9  Energy Artisans Protest of Compliance Filing at 2. \n71°  Id. \n305 of 515"},{"page":15,"startToken":5779,"endToken":6172,"text":"Document Accessig#Pr; -q-230,A18-3P.9.cument:Flild rpa'qg:(360A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 149 - \nb. \nGeneration Interconnection Procedures, pro forma GIA, \nand Common Service Provisions  \n301.\nInvenergy argues that PJM proposes to continue operating a bifurcated study \nprocess in which there is no requirement for generator interconnection and transmission \nservice request studies to be conducted in concert, on similar time frames, or using \nsimilar study assumptions. As a result, Invenergy contends that distinct studies may \nidentify duplicative or unnecessary Network Upgrades. Invenergy requests that the \nCommission and PJM clarify how the definition of Eligible Customer applies to \nco-located generators and co-located loads.7Il \n302.\nConstellation urges the Commission to direct PJM to revise its proposed definition \nof Co-Located Generating Facility to clarify that the definition only applies to the portion \nof the facility serving and physically connected to the Co-Located Load.\"' \nc. \nDefinition of Non-Retail BTMG \n303. AMP argues that PJM's proposed revision to the definition of Non-Retail BTMG \ncould be construed as preventing generating units that are merely eligible for application \nof the Non-Retail BTMG rules from participating in Co-Located Load configurations. \nSpecifically, AMP asserts that the use of the word \"qualifies\" in the proposed definition \nof Non-Retail BTMG may exclude generation from participating in Co-Located Load \nconfigurations even if the generator is not engaged in netting. AMP argues that this \napparently unintentional exclusion would restrict Co-Located Load from accessing \nservice from a broad set of PJM generators. AMP avers that revising the Non-Retail \nBTMG definition is unnecessary and outside the scope of the Commission's compliance \ndirectives. AMP urges the Commission to reject the proposed definition of Non-Retail \nBTMG or, alternatively, revise the definition to specify that the exclusion applies to \ngenerators both qualifying as Non-Retail BTMG and being used for netting under the \nTariff.713 \nd. \nTiming with Planned Reliability Backstop Auction \n304. The Maryland OPC urges the Commission to defer action on PJM's proposed \nrevisions until PJM announces details regarding its planned reliability backstop auction, \nincluding specifics on how the reliability backstop auction will interact with Co-Location \nArrangements to ensure that new Co-Located Loads pay the costs of any new capacity. \n711  Invenergy Comments on Compliance Filing at 3, 6. \n712  Constellation Protest and Comments on Compliance Filing at 17. \n713  AMP Limited Protest of Compliance Filing at 3, 5-8. \n306 of 515"},{"page":16,"startToken":6172,"endToken":6547,"text":"Document Accessig@SA:  2AAFR18-3Q9cument:Flild ja@g: A0A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 150 - \nThe Maryland OPC argues that the proposed Tariff revisions fail to explain how \nincreased capacity costs of allowing existing generators to serve Co-Located Load, as \nopposed to new generators, will be paid by Co-Located Load and not by existing \nratepayers.714 \n4. \nAnswers \n305.\nIn response to Invenergy, Indicated TOs argue that the Commission should not \nmandate a combined interconnection and transmission study process for Co-Located \nLoads and Co-Located Generators. Indicated TOs contend this goes beyond the issues \nthe Commission set for hearing, as well as the compliance directed, in the December \nOrder. Indicated TOs argue that PJM's proposed coordinated study approach is just and \nreasonable.715 \n306.\nExelon argues that Constellation's motion for supplemental protest should be \ndenied because it suggests that Constellation's experience with one transmission owner \nimplies a universal policy. Exelon states that it is not attempting to prevent large loads, \nco-located or otherwise, and their load serving entities from receiving transmission \nservice in Exelon's territories. Exelon also argues that whether a transmission owner \nowns certain equipment does not necessarily inform where the Project Developer's \ninterconnection facilities connect to the transmission owner's interconnection facilities.'\" \n5. \nDetermination \na. \nDefinition of Co-Located Load \n307. As in the Commission's order addressing PJM's first compliance filing with the \nDecember Order, we reject PJM's proposed change to the definition of Co-Located \nLoad.717  We note that no party, including PJM, sought rehearing or clarification of this \ndirective, let alone the definition, in response to the December Order. Even here, PJM \ndoes not allege that the definition of Co-Located Load set out in the December Order is \nunjust and unreasonable. Rather, PJM proposes to deviate from this definition by \nreplacing the term \"Point of Interconnection\" with \"Point of Change in Ownership\" \n714  Maryland OPC Protest of Compliance Filing at 10-11. \n715  Indicated TOs April 24 Answer at 4-5. \n716  Exelon Answer at 1, 5-6. \n717  PJM Interconnection, L.L.C., 195 FERC ¶ 61,030; PJM, Proposed Tariff, \n§ I.1 Definitions C-D (Co-Located Load) (46.0.0); § VII.A 300, Definitions C \n(Co-Located Load) (4.0.0); § VIII.A 400, Definitions C (Co-Located Load) (4.0.0). \n307 of 515"},{"page":17,"startToken":6547,"endToken":7006,"text":"Dodument Acce„igPg 2:41 \n8 - 3P9.9Unlent:FlAd LPA99: A0A.8 / 2 pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 151 - \nwithout sufficient explanation as to how this proposed deviation complies with the \nCommission's directive in the December Order.718 \n308.\nAccordingly, we direct PJM to file, within 60 days of the date of issuance of this \norder, a compliance filing that revises the Tariff's definition of Co-Located Load to use \n\"Point of Interconnection\" instead of \"Point of Change in Ownership,\" consistent with \nthe Commission's directive in the December Order. \nb. \nGeneration Interconnection Procedures, pro forma GIA, \nand Common Service Provisions  \n309.\nWe accept the following of PJM's proposed revisions to establish rules for \nInterconnection Customers serving Co-Located Load as complying with the December \nOrder: (1) adding to the list of requirements for a New Service Request that an \nInterconnection Customer who will use its generator to serve Co-Located Load must \nspecify an Eligible Customer who will take transmission service on behalf of the \nCo-Located Load;719  (2) establishing a new schedule in the pro forma GIA that serves as \na placeholder for specifying any operational procedures or data exchange requirements \nthat PJM deems necessary for Co-Location Arrangements;72°  (3) applying these \nrequirements to all Interconnection Customers requesting to interconnect their generators \nto the transmission system and seeking to use those facilities to serve Co-Located \nLoad;721  (4) clarifying that to the extent that an Interconnection Customer wishes to serve \nCo-Located Load using its generator but not identify an Eligible Customer, then the \nInterconnection Customer may take steps to terminate its generator's interconnection to \nthe PJM transmission system and serve the Co-Located Load fully islanded from PJM's \n718  See, e.g., PJM Interconnection LLC, 119 FERC ¶ 61,179 at P 12 (\"The purpose \nof a compliance filing is to make the directed changes and the Commission's focus in \nreviewing them is whether they comply with the Commission's previously stated \ndirectives.\") (citing AES Huntington Beach, LLC, 111 FERC ¶ 61,079 at P 60 & n.25). \n719  See December Order, 193 FERC ¶ 61,217 at P 188; PJM, Proposed Tariff, \npt. VIII, subpt. B, 403 (4.0.0), § 403(1)(r). \n728  See December Order, 193 FERC ¶ 61,217 at P 188; PJM, Proposed Tariff, \nPart IX.B, Schedule O (0.0.0). PJM explains that it proposes to add a new schedule in the \npro forma GIA in the form of a placeholder for such information as the case may require. \nCompliance Transmittal at 29. We also accept conforming changes to Tariff, Part IX.B, \nGIA Appendices and Schedules. \n721  See December Order, 193 FERC ¶ 61,217 at P 189; PJM, Proposed Tariff, \npt. VIII, subpt.B, 403 (4.0.0), § 403(1)(r). \n308 of 515"},{"page":18,"startToken":7006,"endToken":7489,"text":"Document Accessigt?Sg 22Q12-V;g18-349c ument:FlAdriApA\n8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 152 - \ntransmission system;722  and (5) revising the pro forma GIA to specify that an \nInterconnection Customer that will use its generator to serve Co-Located Load must \nspecify an Eligible Customer that will take transmission service on behalf of the \nCo-Located Load.723 \n310. However, we reject PJM's proposed revisions to comply with the Commission's \ndirective in the December Order to require Interconnection Customers with ISAs or GIAs \nexecuted (or requested to be filed unexecuted) prior to the effective date of the revised \ngeneration interconnection procedures and pro forma GIA directed in that order that wish \nto add Co-Located Load or are currently serving Co-Located Load to publicly notify PJM \nof that addition and identify the Eligible Customer that will take transmission service on \nbehalf of that Co-Located Load.724  Consistent with our discussion above in Part V.C.4, \nwe agree with protesters that PJM's proposed revisions here go beyond the directives in \nthe December Order by requiring Interconnection Customers with existing ISAs or GIAs \nthat are currently serving Co-Located Load or wish to add Co-Located Load (and have \nexecuted Necessary Study Agreements) to initiate a new Necessary Study process and \nenter into a new GIA—which the December Order did not require.725  Therefore, while \nwe appreciate PJM's intent to promote Tariff readability and usability, we find that \nPJM's language in the definition of Co-Located Generating Facility does not comply with \nthe December Order, consistent with our findings regarding the same language in Part III \nof the Tariff.726  We further find that PJM has failed to include a general provision in the \nTariff to comply with the Commission's directive in the December Order to require \nInterconnection Customers with ISAs or GIAs executed (or requested to be filed \nunexecuted) prior to the effective date of the revised generation interconnection \nprocedures and pro forma GIA directed in that order that wish to add Co-Located Load or \nare currently serving Co-Located Load to publicly notify PJM of that addition and \n722  See December Order, 193 FERC ¶ 61,217 at P 189; PJM, Proposed Tariff, \npt. VIII, subpt. B, § 403 (4.0.0), § 403(1)(r). \n723  See December Order, 193 FERC ¶ 61,217 at P 190; PJM, Proposed Tariff, \npt. IX (GIA), subpt. B, Schedule O (0.0.0). \n724  See December Order, 193 FERC ¶ 61,217 at P 191; PJM, Part III (NITS) \n(4.0.0); § VII.A 300, Definitions C (Co-Located Generating Facility) (4.0.0); § VIII.A \n400, Definitions C (Co-Located Generating Facility) (4.0.0). We note that the definition \nof Co-Located Generating Facility in § I.1 Definitions C-D does not include the language \nthat we are rejecting here. \n725  See, e.g., Vistra Protest of Compliance Filing at 4, 14. \n726  See supra Part V.C.4. \n309 of 515"},{"page":19,"startToken":7489,"endToken":7944,"text":"Dodument Acceb6ig:PSA: q§-2Yaq18-31--28.cument:FlAd \nA1/0.8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 153 - \nidentify the Eligible Customer that will take transmission service on behalf of that \nCo-Located Load, separate from the Necessary Study process. \n311.\nTherefore, we direct PJM to submit a compliance filing within 60 days of the date \nof issuance of this order to: (1) revise the definition of Co-Located Generating Facility to \nremove the following requirement: \"If such a Generation Project Developer has an \neffective Interconnection Service Agreement pursuant to Tariff, Part VI or a Generation \nInterconnection Agreement pursuant to Tariff, Part VII, such agreement must be \nsuperseded by a Generation Interconnection Agreement pursuant to Tariff, Part VIII and \nthe pro forma GIA in Part IX, Subpart B,\" and (2) add to Part III a requirement that \nInterconnection Customers with ISAs or GIAs executed (or requested to be filed \nunexecuted) prior to the effective date of the revised generation interconnection \nprocedures and pro forma GIA directed in December Order that wish to add Co-Located \nLoad or are currently serving Co-Located Load publicly notify PJM of that addition and \nidentify the Eligible Customer that will take transmission service on behalf of that \nCo-Located Load. \n312.\nWe disagree with Constellation that PJM's proposed definition of Co-Located \nGenerating Facility should only apply to the portion of the facility that is serving \nCo-Located Load. Constellation claims that the definition does not recognize that the \nentire facility may not serve the Co-Located Load, but Constellation has not identified \nany substantive concern with that outcome. We find the proposed definition is broad \nenough to capture both scenarios. Further, PJM's proposed Tariff language recognizes \nthis possibility elsewhere, such as, for example, Part IX, Subpart A Form of Application \nand Studies Agreement, section 2, which leaves a space for the Interconnection Customer \nto list both the Co-Located Load and any requested CIRs. \n313.\nWith respect to Invenergy's request that PJM perform generator interconnection \nand transmission service request studies in concert, we note that the December Order did \nnot direct PJM to create such a new study process. Thus, we find that Invenergy's \nrequest is beyond the scope of this proceeding. \nc. \nDefinition of Non-Retail BTMG \n314.\nWe agree with AMP that PJM's proposed revisions to the definition of Non-Retail \nBTMG may inadvertently prevent generators that could merely qualify as Non-Retail \nBTMG from participating in Co-Location Arrangements, regardless of whether the \ngenerator is being used to net. As PJM recognizes, the December Order \"did not direct \nany changes to Non-Retail BTMG rules.\"727  PJM did not provide any justification for its \nproposed changes to the definition of Non-Retail BTMG, nor did the Commission direct \n727  Compliance Transmittal at 7. \n310 of 515"},{"page":20,"startToken":7944,"endToken":8280,"text":"Document AccessicIPW 12-Vg18_ 31:AlcUment:FlAd  ifa@gp: A1A 8 /2-Ate F i I ed 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 154 - \nany changes to PJM's rules for Non-Retail BTMG in the December Order.728  Therefore, \nwe reject PJM's proposed revisions to the definition of Non-Retail BTMG and direct \nPJM to file, within 60 days of the date of issuance of this order, a compliance filing to \nrevise its Tariff to remove the proposed changes, consistent with the December Order's \ndetermination. 729 \nd. \nTiming with Planned Reliability Backstop Auction \n315. As discussed below, we decline Maryland OPC's request that the Commission \ndefer action.73°  We find that Maryland OPC's concerns about PJM's capacity market are \nbeyond the scope of this compliance proceeding, which pertains solely to PJM's \ncompliance with the Commission's directives in the December Order. \nE. \nEffective Date \n1. \nPJM Compliance Filing \n316. PJM requests a placeholder effective date of 12/31/9998 because PJM cannot \nimplement the Tariff changes until the Commission sets the terms and conditions of the \nnew transmission services in the paper hearing.731  PJM states that it will submit a \nclean-up filing proposing an effective date after the Commission issues an order on the \npaper hearing.732 \n2. \nEffective Date Pleadings  \n317. Though Vistra says it will address PJM's proposed June 1, 2029 effective date in \nits paper hearing brief, Vistra argues in its protest of the compliance filing that PJM has \nnot shown that its proposed effective date is just and reasonable.733  Vistra alleges that the \nthree-year forward capacity market schedule cannot justify a delay in the provision of \n728  December Order, 193 FERC ¶ 61,217 at P 222 (\"We clarify we do not direct \nPJM to change its rules for non-retail BTMG.\"). \n729  PJM, Proposed Tariff, § I.1 Definitions L-M-N (Non-Retail Behind The Meter \nGeneration) (52.0.0). \n73°  See supra Part VI.K.2. \n731  Compliance Transmittal at 35. \n732  Id. at 35-36. \n733  Vistra Protest of Compliance Filing at 7. \n311 of 515"},{"page":21,"startToken":8280,"endToken":8676,"text":"Dodument AcceesigiPA: gq-2-TZA18-3R9ument:Flil d rpaqg:A1A.812 pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 155 - \nnon-capacity-backed transmission service. Vistra also contends that the forecasts for the \n2027/2028 and 2028/2029 Base Residual Auctions (BRA) include the new large loads \nlikely to come online in that timeframe, undermining PJM's position that the capacity \nmarket schedule should delay the provision of firm transmission service. Vistra also \nargues that PJM has not explained why it will take until 2029 to update its software to \naccommodate the new curtailment logic. \n318.\nDCC argues that PJM's effective date should be earlier than June 1, 2029.734  DCC \nargues that PJM should work with stakeholders to implement workable solutions in a \ntimely manner that ensures the transmission services can meet the immediate need within \nthe PJM region. \n3. \nDetermination \n319.\nAs discussed below in Part VI.J, we direct PJM to submit, within 60 days of the \ndate of issuance of this order, a further compliance filing providing additional \ninformation on the effective date. \nVI. \nPaper Hearing \n320.\nThe Commission directed PJM to modify its Tariff to require that the Eligible \nCustomer taking transmission service on behalf of a Co-Located Load takes one of three \ntransmission services: (1) NITS or Interim NITS, (2) FCD transmission service, or \n(3) NFCD transmission service.735  With respect to the new transmission services that the \nCommission required, the Commission established paper hearing procedures to determine \nthe appropriate rates, terms, and conditions of those transmission services.736  PJM did \nnot file tariff revisions in eTariff, but rather, chose to submit illustrative tariff revisions \nthat mirror the arguments PJM filed in its initial brief as part of that brief. The illustrative \ntariff is not filed as a rate with the Commission, but we consider it as part of the record in \nresponse to the paper hearing as we establish the replacement rate set forth below. As \ndiscussed in detail below, as the replacement rate, we direct PJM to submit within \n60 days of the date of issuance of this order, a compliance filing revising its Tariff to \ninclude rates, terms, and conditions for the new transmission services consistent with our \nfindings in the below sections. \n734  DCC Comments on Compliance Filing at 7. \n735  December Order, 193 FERC ¶ 61,217 at P 193. \n736  Id. PP 194, 203, 207, 219. \n312 of 515"},{"page":22,"startToken":8676,"endToken":9005,"text":"Document Accessig@SA:  A2118-349curnent:FlAd rf)a@g:A1,48/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 156 - \nA. \nRates, Terms, and Conditions for Firm and Non-Firm Contract \nDemand Transmission Service  \n1. \nDecember Order \n321.\nWith respect to FCD transmission service and NFCD transmission service, the \nCommission found in the December Order that these transmission services should be \npermanent transmission services available to Eligible Customers taking transmission \nservice on behalf of Co-Located Load.737  The Commission further stated that for the \nEligible Customer taking transmission service on behalf of a Co-Located Load to be \neligible for these new transmission services, the Co-Located Load must be able and \nwilling to prevent or limit its energy withdrawals and must be separately metered from \nthe associated generator.738  The Commission also stated that Eligible Customers taking \ntransmission service on behalf of Co-Located Loads may take a combination of FCD \ntransmission service and NFCD transmission service, but that Eligible Customers taking \ntransmission service on behalf of Co-Located Loads that will not withdraw energy from \nthe transmission system must take NFCD transmission service at 0 MW.739  The \nCommission also found that Eligible Customers taking either transmission service on \nbehalf of Co-Located Loads would be charged for regulation and black start services \nbased on gross demand, rather than the reserved amount of transmission service.740 \n322.\nThe Commission found that FCD transmission service should have the same \nreservation and curtailment priority as existing firm transmission services at the level of \nthe contract demand and be charged for transmission, ancillary services, and capacity \nbased on the contract demand, with the exception of regulation and black start services.\"' \nWith respect to NFCD transmission service, the Commission found that the service \nshould be available during normal operations and curtailed during emergency operations, \nsimilar to existing non-firm transmission service options.742 \n737  Id. P 206. \n738  Id. \n739  Id. \n740 Id. PP 209, 216. \n741  Id. PP 208-209. \n742 1d P 215. \n313 of 515"},{"page":23,"startToken":9005,"endToken":9424,"text":"Document AccessigiSA: 22Wcp,A18 _ 39pcument:FlAd rFa'qg9: A1A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 157 - \n2. \nNature of FCD and NFCD Transmission Services \na. \nInitial Briefs  \n323.\nPJM proposes to define FCD transmission service as the transfer of capacity and \nenergy for an Eligible Customer on behalf of a designated Co-Located Load, up to a \ndefined, pre-determined MW level of transmission service as requested by the Eligible \nCustomer and confirmed by PJM, using capacity and energy procured by PJM.743  PJM \nproposes to define NFCD transmission service as a service offering the transmission of \nenergy for an Eligible Customer on behalf of a designated Co-Located Load, on an \nas-available basis, up to a defined, pre-determined MW level of transmission service as \nrequested by the Eligible Customer and confirmed by PJM, using energy procured by \nPJM 744 \n324.\nPJM states that it has conceptualized the FCD and NFCD transmission services \nbased on two key principles: (1) the services are designed to serve loads willing and able \nto control their withdrawals from the transmission system, and (2) the services are \ndesigned to allow PJM to maintain system reliability.745  PJM explains that, to maintain \nreliability, any portion of the gross demand of the Co-Located Load not served by the \nCo-Located Generator must be covered by FCD transmission service. PJM also states \nthat, to ensure reliability, PJM's studies of the transmission service requests for the \nCo-Located Load must capture the effects of any unscheduled energy withdrawals and \nvalidate that such events would not jeopardize system reliability.746  PJM then asserts \nthat, if the Co-Located Load's gross demand is not covered by FCD transmission service, \nthen the Eligible Customer must cover the remaining gross demand by applying for \nNFCD transmission service. PJM further states that an Eligible Customer taking service \non behalf of a Co-Located Load must request NFCD transmission service equal to the \nMW level of the Co-Located Generating Facility dedicated to serving the Co-Located \nLoad, so that the customer is eligible to obtain NFCD transmission service if the \nCo-Located Generating Facility is on outage.747  PJM states that it anticipates that, in \npractice, requests for NFCD transmission service will be at the MW level that the \nCo-Located Generating Facility has dedicated to serving the Co-Located Load. PJM \nstates that the Eligible Customer may then, on any given day, reserve NFCD transmission \n743  PJM Initial Brief at 13. \n744  Id at 30. \n745  Id. at 6. \n746  Id at 6-7. \n747  Id. at 9, 16. \n314 of 515"},{"page":24,"startToken":9424,"endToken":9762,"text":"Document Accessig@SA 2,4-2-VA18-34Kument:Flil d  MiLe:A1A8/2pAte Fled: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 158 - \nservice up to the amount specified in the Service Agreement, but only when PJM has \ndetermined there is available transmission capacity. If there is not sufficient capacity to \ngrant the request for NFCD transmission service, PJM explains the Eligible Customer \nmay apply for FCD transmission service for the necessary amount, or NITS to serve the \nentire Co-Located Load.748  PJM maintains that its approach provides flexibility, \nallowing Eligible Customers to mix and match FCD and NFCD transmission services, so \nlong as the combination of the two services covers the entire gross demand of the \nCo-Located Load.749 \n325.\nPJM argues that, to prevent FCD and NFCD transmission services from adversely \nimpacting system reliability, it is crucial for the Eligible Customer to show and prove its \nability to limit withdrawals from the system. PJM maintains that, for FCD transmission \nservice to properly function, it is essential that any NFCD transmission service for the \nsame Co-Located Load has in place necessary control technologies and/or protective \nsystems approved by PJM and that can effectively limit withdrawals from the \ntransmission system that serve the Co-Located Load.75°  PJM proposes to require Eligible \nCustomers taking NFCD transmission service to work with PJM and the affected \nTransmission Owners to establish necessary control technologies and protection systems \nfor each Service Agreement to ensure reliability.751 \n326.\nPJM explains that FCD transmission service will have priority over NFCD \ntransmission service and equal priority, at the level of the contract demand, with other \nfirm transmission services, including NITS. PJM proposes that NFCD transmission \nservice be curtailed before FCD transmission service and NITS, as discussed further \nbelow, and proposes to curtail NFCD transmission service prior to dispatching Pre-\nEmergency Load Response Program resources or in response to a transfer capability \nshortage.752 \n748  Id at 32-33. \n749  Id. at 11. \n758  Id. at 15, 31. \n751  Id. at 34-35. \n752  Id at 15, 34. \n315 of 515"},{"page":25,"startToken":9762,"endToken":10181,"text":"Document AccessigPit; 22q2 06A18 _3PWUMent:FlAd  diaN: 0361A8/2PAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 159 - \nb. \nResponse Briefs  \n327.\nIndicated TOs support PJM's proposal to require Eligible Customers taking \nservice on behalf of Co-Located Load to take a combination of FCD and NFCD \ntransmission services equivalent to the entire gross demand of the Co-Located Load.753 \n328.\nHowever, a number of parties protest PJM's proposed requirement that NFCD \ntransmission service be available only when the Co-Located Generating Facility is on an \noutage.754  Parties argue that the December Order does not impose such a limit on this \ntransmission service and that PJM provides no justification for the change.755  AEU/SEIA \ncontend that the December Order required that NFCD transmission service be available \n\"as needed during normal, non-emergency system operating conditions,\" and that, while \nit cited the use of NFCD transmission service during an outage as one potential use case, \nthe December Order did not impose the limitation described in PJM's proposed Tariff \nrevisions.756  AEU/SEIA claim that the practical consequences of this limitation are \nsignificant, particularly for Co-Located Loads served by resources with variable or \nintermittent output profiles, which may require supplemental grid withdrawals during any \nperiod in which the Co-Located Generator's output is constrained, reduced, or otherwise \ninsufficient to meet the full gross demand of the Co-Located Load. AEU/SEIA argue \nthat this gap in the availability of NFCD transmission service will force many \ntransmission customers to take NITS. \n329.\nAEU/SEIA contend that PJM attempts to justify this restriction on operational and \nplanning complexity grounds, but argues that the Commission considered these \nobjections before the December Order and nonetheless required PJM to provide NFCD \ntransmission service.757  AEU/SEIA also contend that this restriction cannot be justified \non resource adequacy or reliability grounds, because NFCD transmission service is \n753  Indicated TOs Response Brief at 4; Industrials/Amtrak Response Brief at 24. \n754  Joint Co-Location Developers Response Brief at 6-13; AEU/SEIA Response \nBrief at 5; Vistra Response Brief at 25; DCC Response Brief at 4; Constellation Response \nBrief at 10. \n755  Vistra Response Brief at 26; AEU/SEIA Response Brief at 5-6; Joint \nCo-Location Developers Response Brief at 7; DCC Response Brief at 5; Constellation \nResponse Brief at 10. \n756  AEU/SEIA Response Brief at 6-8 (citing December Order, 193 FERC ¶ 61,217 \nat PP 214-215); Joint Co-Location Developers Response Brief at 6-7. \n757  AEU/SEIA Response Brief at 8-10 (citing PJM March 24, 2025 Response \nat 13-15). \n316 of 515"},{"page":26,"startToken":10181,"endToken":10538,"text":"Document Accessigi?Sg 2A-2-VA18-3Q8Cument:Flitd rpa@p: A1/3.8/2  pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 160 - \ndesigned to be curtailed before firm transmission services and is available only when \ntransmission capacity exists. AEU/SEIA therefore request that the Commission direct \nPJM to revise and file Tariff revisions that remove the outage-only limitation and allow \nfor the use of NFCD transmission service on an as-available basis during normal, \nnon-emergency system operating conditions and subject to available transmission \ncapacity and appropriate curtailment priority. \n330.\nJoint Co-Location Developers argue that PJM's proposal undermines economic \nefficiency, restricts competition, may threaten reliability for other customers, and is \nunclear as applied to partial outages.758  Joint Co-Location Developers maintain that \nPJM's proposal is inconsistent with its other transmission service offerings, such as \nPTPS, which is not designed based on whether generation is on an outage. Joint \nCo-Location Developers add that PJM's Interim NITS proposal shows PJM's ability to \noffer non-firm service during normal conditions without the need to request a reservation. \n331.\nDCC argues that PJM's proposal effectively confines NFCD transmission service \nto a narrow, outage-only function and prohibits its use to address foreseeable and \nmanageable transmission constraints. DCC argues that PJM has not demonstrated why \nNFCD transmission service that is (a) requested in advance, (b) subject to PJM approval, \n(c) fully curtailable, and (d) supported by required protection and control mechanisms, \nmay appropriately be used to address generator outages but may not be used to address \ntemporary transmission constraints.759 \n332.\nConstellation also criticizes PJM's view that this proposal is needed to avoid \noveruse and responds that the Commission indicated that penalty charges should solve \nthat concern.'\" \n333.\nConstellation also protests PJM's proposal to require FCD transmission service for \nany portion of the Co-Located Load not served by the Co-Located Generating Facility. \nConstellation argues that the Commission established no such requirement, nor did the \nCommission require that Eligible Customers take FCD transmission service along with \nNFCD transmission service.'\" \n758  Joint Co-Location Developers Response Brief at 8-11. \n759  DCC Response Brief at 5. \n760  Constellation Response Brief at 11-12. \n761  Id. at 10, 12. \n317 of 515"},{"page":27,"startToken":10538,"endToken":10980,"text":"Document AcceseigiStg,4-q-A6, 318 _31-.29cUrnellt Flild EPa g9:A-1A8/2 pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 161 - \n334.\nDCC argues that PJM's proposal does not provide a workable pathway for phased \ndevelopment or load ramping.762  DCC argues that PJM's proposal requires that gross \nload and generation configurations be specified upfront and treats material changes in \nthose configurations as requiring new applications and studies while prohibiting the \nmixing of NITS and Contract Demand transmission services for the same load. DCC \nargues that, while PJM has acknowledged limited flexibility in certain circumstances, it \ndoes not provide a clear or workable pathway for customers to (a) ramp load over time, \n(b) transition between service constructs, or (c) seek to align transmission service with \nphased project development. DCC argues that the absence of a defined ramping \nframework introduces uncertainty, increases the risk of delay, and may require repeated \nstudy cycles that are not aligned with project timelines. DCC argues that the \nCommission should require PJM to establish clear rules and processes that enable \nincremental load additions without triggering unnecessary re-study or requiring \ncustomers to fundamentally restructure their service arrangements.763 \n335.\nMarket Monitor argues that the assumption underlying NFCD transmission \nservice, that load pays for transmission only when it needs transmission, is untenable.764 \nMarket Monitor states that although NFCD transmission service can only be a standby \nservice, the equivalent availability factor of generators in PJM demonstrates that NFCD \ntransmission service would have to be used regularly. Market Monitor argues that if all \nor a significant part of data center users wanted to use NFCD transmission service, the \nsystem would become unmanageable and the service would not be available consistently, \nmaking it meaningless. Market Monitor asserts that there can be no such service as \nNFCD transmission service that is fully consistent with maintaining a reliable PJM \ntransmission system, and all transmission customers should pay for full NITS service. \nc. \nReply Briefs  \n336.\nPJM argues that its proposal to limit NFCD transmission service to circumstances \nwhere the Co-Located Generator is on outage is just and reasonable, consistent with the \nDecember Order, and otherwise appropriate. PJM argues that, if customers could take \nunlimited NFCD transmission service, that would be tantamount to offering Interim NITS \npermanently.765  PJM next argues that the Commission stated in the December Order that \nNFCD transmission service would be available \"as needed\" for customers able to limit \nwithdrawals, which suggests the Commission did not intend for this service to be used on \n762  DCC Response Brief at 6. \n763  Id. at 6-7. \n764  Market Monitor Response Brief at 5-6. \n765  PJM Reply Brief at 6-7. \n318 of 515"},{"page":28,"startToken":10980,"endToken":11414,"text":"Document Accessigi \n2442-YRA1 8 - 3R9 I-Irnent:Flita Eaq99: A1/48/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 162 - \nan everyday basis.766  Moreover, PJM argues, its proposal is appropriate given the \ninherent risks to the transmission system and operational complexities associated with \nproviding this service continuously, given the limited time period the non-firm service \nwill be required. PJM asserts that the transmission system is not planned and designed to \naccommodate these non-firm services under North American Electric Reliability \nCorporation (NERC) reliability standards. \n337.\nPJM maintains that several aspects of NFCD transmission service are challenging \nfrom a reliability perspective, given the range of requirements of NERC reliability \nstandards. PJM alleges that the nature of NFCD transmission service dictates that PJM \nwill not include this service in PJM's long-term transmission planning and the system \nwill not be evaluated for potential Corrective Action Plans, nor will PJM have procured \ncapacity to serve this load.767  PJM also claims that, because NFCD transmission service \nrelies on transmission capacity that is not currently used, PJM is unlikely to be in a \nposition to provide this service during peaks or other times when the system is operating \nunder stressed conditions. PJM argues that, from a transmission planning perspective, \nNFCD transmission service increases the operational risk of System Operating Limit and \nInterconnection Reliability Operating Limit (SOL/IROL) exceedances by operating the \nsystem with a reduced margin for contingency to accommodate high-volume loads.768 \nPJM contends that this operation increases the risk of an emergency occurring if \nunexpected conditions occur. PJM argues that providing NFCD transmission service will \nalmost inevitably require significant adjustments to PJM's Operating Plan to mitigate \nexceedances of SOLs/IROLs each time service is provided due to the nature of the \nservice. PJM maintains that, by definition, NFCD transmission service involves a \ncustomer drawing large quantities of power over transmission facilities that were not \ndesigned to serve that load and thus will almost certainly necessitate flowing power over \nvarious facilities near system limits.769 \n338.\nIndicated TOs support PJM's proposals to restrict the use of NFCD transmission \nservice to periods when on-site generation is on outage and claim that the Commission \ndid not intend for this service to be a substitute for FCD transmission service or NITS for \nthe portion of on-site load that will not be served by on-site generation. Indicated TOs \nargue that there is no compelling reason for NFCD transmission service to be available \n766  Id at 7 (quoting December Order, 193 FERC ¶ 61,217 at P 215). \n767  Id at 9-10. \n768  Id at 11-12. \n769  Id at 12-13. \n319 of 515"},{"page":29,"startToken":11414,"endToken":11801,"text":"Document AccessigPsP; qq-Aqq-1.8-31;28curnent:Fhla 'PAP: cZq.812psIte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 163 - \nduring non-outage conditions.77°  Indicated TOs claim that limiting the use of NFCD \ntransmission service is necessary to ensure the reliable operation of the PJM transmission \nsystem, particularly because of the increasing use of special protection schemes, remedial \naction schemes, and other control technologies and protective systems. Indicated TOs \nrecommend that PJM clarify in the Tariff that an \"outage\" for these purposes is limited to \nperiods where a generator is offline due to a breakdown or maintenance issues and does \nnot cover other instances when a generator is not operating.771 \n339.\nJoint Co-Location Developers urge the Commission to reject PJM's attempt to \nlimit the availability of NFCD transmission service and require PJM to establish a NFCD \ntransmission service product available during normal system conditions as required by \nthe December Order.772  Joint Co-Location Developers contend that the workable \nnon-firm transmission service offerings that are broadly available are fully consistent \nwith reliable system operation, as demonstrated in other regions that are rapidly moving \nto implement non-firm transmission service offerings.773  Joint Co-Location Developers \nargue that limiting the scope of NFCD transmission service scheduling to generator \noutages, as PJM proposes, will increase reliance on simple withdrawal-limiting protection \nsystems rather than decrease it because it will increase the frequency with which a \ncustomer will not be authorized to withdraw.774  Joint Co-Location Developers explain \nthat this is because withdrawal-limiting protection systems are only active when the \ncustomer cannot withdraw, i.e., because no transmission service has been scheduled. \nJoint Co-Location Developers argue that PJM should limit the arming of remedial action \nschemes, or avoid installing them in the first place, and instead maximize use of \npre-contingency NFCD transmission service curtailment through scheduling, which is \nsimilar to how Southwest Power Pool, Inc. (SPP) and Electric Reliability Council of \nTexas (ERCOT) envision curtailment under the non-firm transmission services that they \nare developing.775 \n340.\nIn response to DCC's concerns about phasing in Co-Located Load, PJM maintains \nthat its proposal provides a workable pathway for phased development or load \n77°  Indicated TOs Reply Brief at 3-4. \n771  Id. at 5-6. \n772  Joint Co-Location Developers Reply Brief at 10-11. \n773  Id. at 1. \n774  Id. at 7. \n775  Id. at 8. \n320 of 515"},{"page":30,"startToken":11801,"endToken":12224,"text":"Document AccessigOA 2Q2o18-31:2@ Urnent:FiAd M99: Ag118/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 164 - \nramping.776  PJM argues that the obvious path for Co-Located Load that increases over \ntime is NITS, a transmission service designed to accommodate load growth. If an \nEligible Customer elects Contract Demand transmission service, any change to the \ncontracted amount would require a new service request. PJM adds that the Eligible \nCustomer could elect to request Interim NITS or FCD transmission service for their full \nload amount ahead of time and use that capacity as their demand increases up to the \napplied for service level. PJM explains that the Commission directed PJM to offer FCD \nand NFCD transmission services as an alternative to NITS; thus, it is reasonable for this \nnew service to not accommodate load growth as NITS does. \nd. \nAnswer \n341.\nGeronimo Power asserts that PJM's proposed restrictions on NFCD transmission \nservice are inconsistent with the December Order and should be rejected.777  In response \nto PJM's and Indicated TOs' concerns with making this service more broadly available, \nGeronimo Power argues that PJM does not need to expand its transmission system or \notherwise change its operations to accommodate this load; rather, it merely needs to \nallow such load to take transmission service when it is available.778  Geronimo Power \nargues that the effect of PJM's proposal will be to severely limit co-location opportunities \nin PJM, because large loads will need to either co-locate with a resource that can be \ncalled upon at all times or to take NITS or FCD transmission service that will result in the \nsame inefficient and costly grid buildout that the December Order sought to avoid.779 \ne. \nDetermination \n342.\nAs discussed below, we find that PJM's proposal does not comply with the \nCommission's directives in the December Order and would fundamentally alter the \nnature of the FCD and NFCD transmission services that the Commission directed PJM to \ndevelop. PJM proposes to require that the Eligible Customer taking transmission service \non behalf of a Co-Located Load must take sufficient transmission service to account for \nthe entire gross demand of the Co-Located Load.78°  PJM states that an Eligible Customer \ntaking service on behalf of a Co-Located Load must request NFCD transmission service \nequal to the MW level of the Co-Located Generator dedicated to serving the Co-Located \n776  PJM Reply Brief at 37-38. \n777  Geronimo Power May 21 Answer at 4. \n778  Id. at 6. \n779  Id. at 7. \n78°  PJM Initial Brief at 6, 9. \n321 of 515"},{"page":31,"startToken":12224,"endToken":12712,"text":"Document A„e6§-3:gi Sg qq-AqA1 - 31:299Urnent:Filtd Iraqg9:W.A8 / 2 pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 165 - \nLoad, so that the customer is eligible to obtain NFCD transmission service if the \nCo-Located Generator is on outage.781  PJM also explains that any portion of the gross \ndemand of the Co-Located Load not served by the Co-Located Generator must be \ncovered by FCD transmission service.782  This proposal would tie the amount of FCD and \nNFCD transmission services that an Eligible Customer can request to the size of the \nCo-Located Generator, rather than allowing the Eligible Customer to select any amount, \nincluding 0 MW for NFCD transmission service, as the Commission directed. \nSpecifically, the December Order stated that Eligible Customers on behalf of Co-Located \nLoads would be able to take a combination of FCD and NFCD transmission services, but \nthat \"Eligible Customers taking transmission service on behalf of Co-Located Loads that \nwill not withdraw energy from the transmission system must take [NFCD] transmission \nservice at 0 MW.\"783  PJM's proposal would do the opposite. An Eligible Customer \ntaking transmission service on behalf of a Co-Located Load that wished to be served \nentirely by the Co-Located Generator, and not withdraw any energy from the \ntransmission system, would be required under PJM's proposal to request NFCD \ntransmission service at a level of contract demand equal to the Co-Located Load's gross \nload.784  Moreover, contrary to PJM's proposal, nothing in the December Order would \nrequire an Eligible Customer taking transmission service on behalf of a Co-Located Load \nto take FCD transmission service at a level of contract demand that reflects the amount of \nload not served by the Co-Located Generator (or, for that matter, to take FCD \ntransmission service at all). In short, the December Order does not link the level of \ncontract demand for either FCD or NFCD transmission service that an Eligible Customer \nmay take on behalf of a Co-Located Load to the size of the Co-Located Generator or the \nsize of the Co-Located Load. \n343. Taken together, PJM's proposed new conditions on FCD and NFCD transmission \nservices mean that if PJM determines as a result of studies that it cannot accommodate a \nrequest for NFCD transmission service, the Eligible Customer will be required to request \nand take a firm transmission service (FCD transmission service or NITS) on behalf of the \nCo-Located Load instead. In the December Order, the Commission directed PJM to \nimplement FCD and NFCD transmission services in response to a finding that the Tariff \nis unjust and unreasonable because it does not include transmission services that reflect \nEligible Customers taking service on behalf of Co-Located Loads that are willing and \nable to limit their energy withdrawals from the transmission system under certain \n7811d at 9, 16. \n782  Id at 6-7. \n783  December Order, 193 FERC 1161,217 at P 206. \n784  PJM Initial Brief at 9. \n322 of 515"},{"page":32,"startToken":12712,"endToken":13192,"text":"Document Accessigf?Sg 2k2-W518-34@Cument:Flil d rpAg:Ag,48/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 166 - \nconditions.785  PJM's proposal does not address this finding and proposes to create FCD \nand NFCD transmission services that continue to fail to recognize this flexibility. \nMoreover, requiring an Eligible Customer seeking to take transmission service on behalf \nof a Co-Located Load to take FCD transmission service or NITS instead of NFCD \ntransmission service when it does not seek to take firm transmission service would be \ninconsistent with the Commission's finding in the December Order that the lack of the \nrequired new transmission services could result in unnecessary, costly, and inefficient \nNetwork Upgrades, increasing Network Upgrade costs.786  While we recognize that PJM \nmay determine that there is insufficient available transmission capacity to fulfill a request \nfor NFCD transmission service,787  in that scenario, the Eligible Customer seeking to take \nthat service on behalf of a Co-Located Load should then be able to decide whether it \nwould prefer to request FCD transmission service or NITS to serve the load — in which \ncase it may be responsible for Network Upgrade costs — or to take 0 MW of NFCD \ntransmission service and thus have no contractual right to withdraw power from the \ntransmission system. \n344. PJM's proposal is also inconsistent with the December Order in that PJM proposes \nto limit the amount of NFCD transmission service that may be reserved by an Eligible \nCustomer to a MW level equivalent to the amount of the Co-Located Generator that is on \noutage.788  The December Order did not require such a restriction and instead \ncontemplated that NFCD transmission service would be available during \"normal\" \noperations when there is sufficient available transmission capacity,789  providing Eligible \nCustomers seeking to take transmission service on behalf of Co-Located Loads the \n785  December Order, 193 FERC ¶ 61,217 at P 193. \n786  See id. P 177 (\"[F]or Eligible Customers taking service on behalf of \nCo-Located Loads that do not reserve transmission or take energy from the transmission \nsystem but which receive only regulation and black start services, or that otherwise are \nwilling and able to limit their energy withdrawals from the transmission system, requiring \nsuch Eligible Customers to take NITS on behalf of these Co-Located Loads may in some \ncircumstances result in costly and inefficient transmission system buildout that may not \nbe necessary if such Eligible Customers are willing and able to take a transmission \nservice that requires fewer Network Upgrades to provide, and therefore may result in \nlower Network Upgrade costs, than would NITS.\"). \n787  See id. P 215 (stating that reservations for NFCD transmission service \"would \nbe available only when there is available transmission capacity, similar to existing \nnon-firm transmission service options in the Tariff'). \n788  PJM Initial Brief at 32. \n789  December Order, 193 FERC ¶ 61,217 at PP 214-215. \n323 of 515"},{"page":33,"startToken":13192,"endToken":13697,"text":"Document Accessig \n2AAgg-18 _ 3Qacument:Flil d  gage: \nL8/2\n to Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 167 - \nflexibility to request to reserve any amount of NFCD transmission service, regardless of \nwhether the Co-Located Generator was on outage. The Commission's reference to \nNFCD transmission service and generator outages was an example and not a threshold \nrequirement for an Eligible Customer to use this service.790  Regardless, because the \nCommission contemplated that the service would be available during normal operations \nwhen there is sufficient available transmission capacity, Eligible Customers seeking to \ntake NFCD transmission service on behalf of Co-Located Loads must be permitted to \nrequest such service on an everyday basis. Further, contrary to the December Order, \nPJM's proposal to allow Eligible Customers taking transmission service on behalf of \nCo-Located Loads to take NFCD transmission service only when the Co-Located \nGenerator is on outage fails to reflect Eligible Customers taking transmission service on \nbehalf of Co-Located Loads that are willing and able to limit their energy withdrawals \nfrom the transmission system under certain conditions because it removes the option to \ntake NFCD transmission service instead of FCD transmission service for portions of the \nCo-Located Load that are not served by the Co-Located Generator. \n345. PJM argues that these changes to NFCD transmission service are necessary for \nreliability, to ensure all load is studied. We disagree. Co-Located Load is, as defined in \nthe December Order, behind the Point of Interconnection of an interconnected generator, \nand PJM would already know the size of the generator and any Co-Located Load from \nthe interconnection process (or Necessary Study), and possibly the transmission service \napplication process. While the portion of load for which the Eligible Customer does not \nrequest transmission service would not be modeled by PJM in a transmission service \nrequest as withdrawing energy from the transmission system, this outcome is appropriate \nbecause the Eligible Customer is not intending to withdraw energy from the transmission \nsystem. However, the potential impact of the Co-Located Load on the reliability of the \ntransmission system will still be studied as part of the Necessary Study process for the \ngenerator interconnection modification, or as part of a New Service Request. PJM \nalready conducts dynamic studies for Co-Located Load, which evaluate all applicable \nNERC, PJM, and transmission owner-specific contingencies and criteria, consistent with \nPJM's responsibilities to ensure system reliability.791  These studies utilize a composite \nload model that includes power electronics, cooling, and lighting loads, and the impact of \nthe facility during this study is dependent on the physical parameters of the facility and \n790 See id P 214 (\"Eligible Customers taking service on behalf of such loads may, \nhowever, still seek to withdraw energy from the transmission system from time to time \nwhen transmission capacity is available and not needed by firm customers. For example, \nan Eligible Customer could seek a transmission reservation for a Co-Located Load in \nadvance for the duration of an expected outage of the associated generator.\") (emphasis \nadded). \n791  PJM March 24, 2025 Response at 53. \n324 of 515"},{"page":34,"startToken":13697,"endToken":14145,"text":"Document AccessigPV; 2A2-Vg18-349cument:FiAd rEqv: ,vA812pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 168 - \nits control behavior, not the level or type of transmission service taken.792  This model is \na complete model of the facility.793  As such, PJM, as it currently does, will know the full \nimpact of factors unrelated to the contract demand of the Co-Located Load, including \nimpacts on stability margins, short circuit limits, power quality and harmonic distortion, \nvoltage flicker, interaction of active power electronic controls with the system (e.g., \nmitigation of oscillatory behavior), impact of STATCOMs or other reactive \ncompensation devices, and cyclical demand ramps in the sub-synchronous frequency \nrange. PJM provides no explanation why this data already available to them is \ninsufficient to fully study a Co-Located Load absent changes to NFCD transmission \nservice. \n346.\nPJM also argues that providing NFCD transmission service will require \nadjustments to PJM's Operating Plan to mitigate exceedances of SOLs/IROLs each time \nservice is provided due to the nature of the service. While serving load using NFCD \ntransmission service may reduce operating margins on the transmission system, PJM has \npresented no evidence that changes to PJM's Operating Plan will be regularly needed. \nHowever, should PJM find, based on operating experience in implementing the NFCD \ntransmission service, that significant and frequent manual adjustments are necessary, \nPJM may consider filing an FPA section 205 filing to adjust the curtailment priority of \nNFCD transmission service. \n347.\nPJM also argues that, by definition, NFCD transmission service involves a \ncustomer drawing large quantities of power over transmission facilities that were not \ndesigned to serve that load and thus will almost certainly necessitate flowing power over \nvarious facilities near system limits. While we acknowledge that NFCD transmission \nservice is designed to use available transmission capacity that is not needed by firm \ntransmission customers, we find that PJM's assertion that providing such service will \nnecessitate flowing power over various transmission facilities near system limits is \nspeculative. In any case, as the Commission stated in the December Order, \n\"[r]eservations under this service would be available only where there is available \ntransmission capacity, similar to existing non-firm transmission service options in the \n792  Id. We note that NERC has recommended use of the Power Electronic \nReconnecting and Ceasing (PERC1) model, which is a different model than the current \nmodel PJM utilizes. However, the general principles are the same. See NERC, Essential \nAction to Industry: Computational Load Modeling, Studies, Instrumentation, \nCommissioning, Operations, Protection, and Control at 3 (2026), \nhttps://www.nerc.com/globalassets/programs/bpsa/alerts/level-3-computational-load-\nalert.pdf. \n793  See, e.g., PJM, PJM Dynamic Model Development Guidelines for \nInterconnection Analysis § 6, PJM Dynamic Model Development Guidelines. \n325 of 515"},{"page":35,"startToken":14145,"endToken":14633,"text":"Document AcceeeigPSP:  qC)gis-3RPcument:FliLd YAP: AA.812pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 169 - \nTariff.\"794  And consistent with the Commission's findings in establishing non-firm \ntransmission service under its pro forma Open Access Transmission Tariff, providing \nnon-firm transmission service increases efficiency by allowing customers to use lumpy \ntransmission investment on an as-available basis and may reduce the costs for firm \ntransmission service customers by allowing NFCD transmission service customers to \noffset the costs of that investment.795  However, we note that if PJM determines that there \nmay be increased operational risks associated with providing NFCD transmission service, \nit may address those risks by increasing the transmission reliability margin that it uses \nwhen studying and determining whether to grant requests for NFCD transmission service. \n348. \nWe recognize that the new FCD and NFCD transmission services represent a \nsignificant change in how transmission service has been historically offered in PJM. We \nalso recognize that significant changes to PJM's software may be necessary to integrate \nthe FCD and NFCD transmission services, including to potentially automate some \nprocesses that are currently handled manually by operators with respect to curtailing \nnon-firm transmission services. However, the Commission directed the new FCD and \nNFCD transmission services as the replacement rate after finding PJM's existing Tariff \nunjust and unreasonable. We therefore direct PJM to submit a compliance filing within \n60 days of the issuance of this order proposing Tariff revisions to permit Eligible \nCustomers to elect to take FCD transmission service or NFCD transmission service \nwithout the limitations that PJM proposes (i.e., (1) the requirement that the Eligible \nCustomer taking transmission service on behalf of a Co-Located Load must take \nsufficient transmission service to account for the entire gross demand of the Co-Located \nLoad, (2) the requirement for an Eligible Customer taking transmission service on behalf \nof a Co-Located Load to take FCD transmission service at a level of contract demand that \nreflects the amount of load not served by the Co-Located Generator, (3) the requirement \nthat an Eligible Customer taking service on behalf of a Co-Located Load must request \nNFCD transmission service equal to the MW level of the Co-Located Generating Facility \ndedicated to serving the Co-Located Load if that portion of the Co-Located Load is not \ncovered by FCD transmission service, and (4) the restriction on the use of NFCD \ntransmission service to only those circumstances where the Co-Located Generator is on \noutage). Consistent with our determination above to extend the three new transmission \nservices set forth in the December Order to Eligible Customers taking service on behalf \nof load with BTMG that are willing and able to limit their energy withdrawals from the \n794  December Order, 193 FERC ¶ 61,217 at P 215. \n795  Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,272 (finding \"non-firm \ntransmission prices should reflect the interruptibility of the service and should promote \nefficient use of the transmission system\"). \n326 of 515"},{"page":36,"startToken":14633,"endToken":15056,"text":"Document Accessig@Sg 2r218-34f6\nurnent:FiAd. EPAP: a I.8/2ce Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 170 - \ntransmission system under certain conditions, we further direct PJM to reflect this change \nin its compliance filing. \n349.\nWith respect to DCC's argument that PJM's proposal does not provide a workable \npathway for phased development or load ramping,796  we disagree. Because FCD \ntransmission service is based on a reserved amount of contract demand and does not \naccount for load growth in the way that NITS does, Eligible Customers seeking to \nincrease the amount of load for which they are taking transmission service over time \nshould be required to submit new transmission service requests for any increases in \ncontract demand. As an alternative, they may request a level of contract demand in their \ninitial transmission service request that reflects their planned total load, even though they \nmay not need the full level of contract demand immediately. To the extent that neither of \nthese options work for a particular Eligible Customer taking transmission service on \nbehalf of a Co-Located Load, that Eligible Customer should consider taking NITS, which \naccommodates load growth over time, as PJM suggests.797 \n350.\nDCC also argues that PJM prohibits the mixing of NITS and FCD or NFCD \ntransmission service for the same load.798  However, in the December Order, the \nCommission explicitly stated that NITS cannot be combined with any of the new \ntransmission services.799  As such, we find that DCC's argument is an untimely request \nfor rehearing of the December Order and dismiss it.8°° \n351.\nWith respect to DCC's argument that Eligible Customers serving Co-Located \nLoad should be able to transition between transmission services,801  we note that Eligible \nCustomers taking transmission service on behalf of Co-Located Load that wish to \ntransition from one transmission service to another may do so through the same process \n796  DCC Response Brief at 6. \n797  PJM Reply Brief at 37-38. \n798  DCC Response Brief at 6. \n799  December Order, 193 FERC 1161,217 at P 195 n.408 (\"Eligible Customers \ntaking NITS on behalf of Co-Located Load may not combine NITS with any of the other \ntransmission services discussed herein.\"). \n888  See, e.g., ISO New Eng. Inc., 132 FERC ¶ 61,098 at P 12 (\"The Commission \nhas held that requests to alter a compliance filing in a manner that differs from the order \nrequiring the compliance filing constitute a collateral attack on the order requiring the \ncompliance filing.\"). \n801 DCC Response Brief at 6. \n327 of 515"},{"page":37,"startToken":15056,"endToken":15466,"text":"Doaum„t AccesigPfr; 4q'Aggl.i3 -349curnent:Flild rEq99: c3E2818/ 2  pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 171 - \nas any other party requesting new transmission service, with the exception of the \nanti-toggling procedures discussed below in Part VI.E. \n352.\nFinally, with respect to Market Monitor's argument that NFCD transmission \nservice is untenable, we dismiss this argument as an untimely request for rehearing of the \nDecember Order. We disagree that NFCD transmission service is untenable if it is not \navailable constantly; to the contrary, NFCD transmission service is designed to be \nnon-firm and as-available, meaning that it will sometimes be unavailable or curtailed. It \nis possible that if, for example, a significant number of Eligible Customers taking \ntransmission service on behalf of Co-Located Loads were to switch to NFCD \ntransmission service, it would be frequently curtailed, but that is the nature of non-firm, \nas opposed to firm, transmission service. Eligible Customers taking transmission service \non behalf of Co-Located Loads that do not wish to be curtailed should consider \nrequesting a firm transmission service instead. \n3. \nStudy Process  \na. \nInitial Briefs  \n353.\nPJM states that it will coordinate with the affected transmission owner to complete \nstudies, obtain relevant data, and identify any necessary enhancements to the \ntransmission system to accommodate the requested level of service.802  PJM also states \nthat, during the study period, it may perform other studies. \n354.\nPJM proposes that it notify the affected transmission owner of an application for \nFCD transmission service to allow for coordination to study the potential impacts of \nproviding this service on the transmission owner's system.803  PJM states that it will \ndetermine any necessary studies to provide the requested transmission service. If studies \nare needed, PJM explains, it will provide an application and studies agreement to the \nEligible Customer in which the Eligible Customer will agree to reimburse PJM for study \ncosts. PJM also states that it will consider the results of any transmission owner studies. \n355.\nPJM proposes that, upon receiving a service request, it will coordinate with the \naffected transmission owner to complete necessary studies to determine whether, and at \nwhat level, NFCD transmission service can be reliably provided.804  PJM proposes that it \nand the affected transmission owner will determine whether additional studies are \nrequired to assess the NFCD transmission service request, and if so, which studies are \n802 PJM Initial Brief at 17-18. \n803 Id. at 24. \n8°4  Id. at 32-33. \n328 of 515"},{"page":38,"startToken":15466,"endToken":15956,"text":"Document Accessig@Sg 2218-34Kument:Flild EFas@v: (43,48/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 178 - \nwould address many of the concerns in the record because it would ensure Eligible \nCustomers have more detail, transparency, and certainty regarding the study process, \nwhich is the primary concern of the protesters.833  Thus, we direct PJM to submit a \ncompliance filing within 60 days of the date of issuance of this order to revise its Tariff to \nprovide that it will study FCD transmission service requests using its existing process for \nstudying firm transmission service requests. Consistent with our determination above to \nextend the three new transmission services set forth in the December Order to Eligible \nCustomers taking service on behalf of load with BTMG that are willing and able to limit \ntheir energy withdrawals from the transmission system under certain conditions, we \nfurther direct PJM to reflect this change in its compliance filing. \n373. With respect to NFCD transmission service, we agree with parties arguing that \nPJM's proposal lacks specificity. PJM argues that \"the study approach could differ \nwidely for each request, given the different nature of the risks involved, as the system \nwould be operated on an as-conditions-permit basis.\"834  The lack of detail creates a level \nof discretion that is not just and reasonable; while some amount of discretion is likely \nnecessary to ensure PJM is able to perform any additional studies necessary to maintain \nreliability, Eligible Customers must have some understanding of the study process PJM \nwill use to evaluate transmission service requests. Therefore, we direct PJM to submit a \ncompliance filing within 60 days of the date of issuance of this order that revises its \nTariff to include study procedures for NFCD transmission service requests. We note that \nthe Tariff includes detailed procedures for the study of Non-Firm PTPS, which serve as a \nuseful reference. In particular, the Tariff provides that, following receipt of a tendered \nschedule, PJM will make a determination on a non-discriminatory basis of available \ntransfer capability for PTPS requests, based on a specific methodology detailed in Tariff, \nAttachment C.835  No party has shown why a similar process should not apply for NFCD \ntransmission service, and PJM has not demonstrated that having so little detail in the \nTariff regarding the process for studying requests for NFCD transmission service is just \nand reasonable. PJM's compliance filing must also include details about the term length \nof NFCD transmission service, including the minimum term. Consistent with our \ndetermination above to extend the three new transmission services set forth in the \nDecember Order to Eligible Customers taking service on behalf of load with BTMG that \n833  See PJM, Intra-PJM Tariffs, pt. VIII, § 404 (1.0.0) (providing overview of \nsystem impact studies, including scope of studies). \n834  PJM Reply Brief at 26. \n835  See PJM, Intra-PJM Tariffs, OATT, §§ \n11.18.4; id attach. C \n(Methodology to Assess Available Transfer Capability). \n335 of 515"},{"page":39,"startToken":15956,"endToken":16393,"text":"Document AccessigPA:  22q-2-Vt4318-31:29ument:Flild d'Ap:*9_8\n pa_te Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 172 - \nappropriate. PJM proposes that it will provide a written explanation if it determines that \nnone or only a portion of the requested service can be reliably provided. \nb. \nResponse Briefs \n356.\nIndicated TOs support PJM's proposed study processes for FCD transmission \nservice and state that it appropriately recognizes the role of transmission owners in \nevaluating load interconnection requests.805  Indicated TOs argue, however, that the \nTariff should specify that load integration studies should be completed first and inform \nthe determination of whether additional studies are necessary for purposes of an Eligible \nCustomer's request for transmission service on behalf of a Co-Located Load and the \ninterconnection of any on-site generation. Indicated TOs contend that this requirement \nwould maximize the speed and efficiency of the overall process and avoid potential \nduplication of effort and expense as between PJM and the PJM transmission owners. \n357.\nIndicated TOs state that PJM appears to contemplate that an Eligible Customer's \ninitial application for NFCD transmission service would serve as a \"holding\" request and \nthat the actual reservation and use of the service would require the Eligible Customer to \nmake a request and PJM to determine whether or not the requested amount of service is \navailable.806  Indicated TOs further state that the available amount of NFCD transmission \nservice presumably would serve as the basis for determining the relevant charge to the \nEligible Customer. Indicated TOs request that PJM confirm these understandings and \nadd appropriate Tariff language. Indicated TOs also request that PJM clarify whether the \nstudy process set forth in section 710.3 of the illustrative tariff provisions is intended to \ncover only the initial service study or also subsequent determinations as to specific \nreservation requests. Generally, Indicated TOs argue that more detail should be provided \nas to the process for evaluating and granting requests for NFCD transmission service, \nincluding the timelines associated with such requests, particularly with respect to forced \nrather than planned outages.807  Indicated TOs also contend that PJM should specify in \nTariff language that NFCD transmission service will be available for periods from one \nmonth to one hour in duration. \n358.\nSeveral parties argue that PJM's proposed study process is unjust and \nunreasonable.808  Constellation argues that PJM fails to sufficiently describe its proposed \nstudy procedures for the three new services. Vistra similarly argues that PJM's study \n8°5  Indicated TOs Response Brief at 5-7. \n806 Id. at 4. \n807  Id. at 4-5. \n8°8  Vistra Response Brief at 31, 33-35; Constellation Response Brief at 14-15. \n329 of 515"},{"page":40,"startToken":16393,"endToken":16855,"text":"Doctunerit A„e„igP.V; \nqQrAgg-18-3R89urnent:Filla rgq99:A3A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 173 - \nprocess provides too much discretion to PJM and transmission owners to determine \nwhether studies are required, which studies to conduct, the timeline for doing so, and how \nto prioritize different requests. First, Vistra asserts that PJM does not propose a \nmechanism to assign customers a queue position based on the submission of a complete \napplication. Vistra also charges that PJM reserves to itself full discretion to determine \nwhether studies must be conducted and what analyses those studies will involve, and \nalleges that the proposed tariff does not appear to limit the results of PJM's analysis of \ntransmission service requests to the results of duly conducted studies because it states that \nPJM will \"consider\" the results of the study procedures.809  Vistra and Constellation also \nargue that PJM provides no timelines or deadlines for processing transmission service \nrequests. Vistra also argues that PJM provides itself total discretion to set study fees with \nno parameters for setting those fees. Vistra and Constellation express concern that the \ndiscretion in PJM's proposal creates a risk of undue discrimination. Vistra and \nConstellation argue that PJM's proposal violates the Commission's rule of reason policy \nbecause the information missing from the tariff proposal significantly affects rates, is \nreadily susceptible of specification, and is not so readily understood as to render \nrecitation superfluous.81°  Vistra also contends that PJM's proposal is unclear on what it \nmeans to ensure that non-firm transmission service can be provided \"reliably,\" and \nrequests that PJM articulate the standard.\"' \nc. \nReply Briefs \n359.\nPJM maintains that its illustrative tariff contains an appropriate amount of detail \non the study process and states that it will work with stakeholders to develop \nimplementation details to be set forth in the PJM manuals.812  PJM avers that the \nillustrative tariff provides more than enough detail to satisfy the Commission's rule of \nreason policy. PJM alleges that its proposal builds on its existing processes for studying \nrequests for new transmission service requests. PJM contends that its evaluation of firm \ntransmission service requests will require and follow similar study procedures to what is \nnow required for NITS. For non-firm transmission service requests, PJM asserts that the \nstudy approach could differ widely for each request and will depend on a number of \nfactors. \n360.\nPJM explains that, currently, the transmission owners study in the first instance all \nrequests to connect new load to the transmission system. PJM states that, for each zone, \n809 Vistra Response Brief at 33-34 (citing PJM, Initial Brief, attach. A § 702.3). \n810 Id. at 36-37, 53; Constellation Response Brief at 15-18. \n811  Vistra Response Brief at 39. \n812  PJM Reply Brief at 22-23, 26, 32. \n330 of 515"},{"page":41,"startToken":16855,"endToken":17283,"text":"Document .Accessigl \n2Cr2VA18_3Q9cUMent:FlAdda\nA3A812pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 174 - \nthe transmission owner studies the integration of the requested load and identifies \nupgrades. PJM says that it then performs a \"do no harm\" analysis of how those \ntransmission owner-identified upgrades would affect the regional transmission system. \nPJM notes that NITS can then be provided consistent with the in-service date of the \nidentified upgrades.813  PJM contends that the allocation of responsibilities between the \ntransmission owners and PJM in the current study process follows the division of rights \nrecently affirmed by the Commission and courts, i.e., transmission owners' reservation of \nrights over local transmission planning and PJM's responsibility for the regional \ntransmission system.814  PJM claims that it maintains this division of rights in the \nillustrative tariff provisions. \n361.\nPJM also rejects protesters' arguments that its proposal affords PJM and the \ntransmission owners inappropriate discretion. PJM argues that it seeks no more \ndiscretion than it currently has under its existing study processes. PJM argues that its \nevaluation of the transmission system to determine whether it can reliably provide the \nrequested transmission service requires an exercise of engineering judgment, which \ninherently entails a reasonable exercise of discretion.815 \n362.\nPJM argues that reliability reviews inherently require PJM to make judgment calls \nas the transmission provider and a NERC-designated Reliability Coordinator, and the \nflexibility to determine whether new transmission facilities are reasonably likely to be \nin-service fits squarely within PJM's expertise. PJM asserts that protesters' concerns \nabout the level of detail generally concern the transmission owner's load integration \nstudies, which PJM argues does not inherently implicate the Commission's jurisdiction \nunder the FPA.816  In response to concerns about study timelines, PJM contends that its \nevaluation of any transmission service request is dependent on the load integration \nstudies performed by the applicable transmission owner.817  PJM asserts that it does not \n813  Id at 24. \n814  Id. at 24 & n.68 (citing PJM Interconnection, L.L.C., 172 FERC ¶ 61,136, \norder on reh'g, 173 FERC ¶ 61,225, at P 19 (2020), aff'd sub nom. Am. Mun. Power, Inc. \nv. FERC, 86 F.4th 922 (D.C. Cir. 2023); PJM Interconnection, L.L.C., 173 FERC \n¶ 61,242 (2020), order on reh'g, 176 FERC ¶ 61,053 (2021), aff'd sub nom. Am. Mun. \nPower, Inc., 86 F.4th 922; Monongahela Power Co., 164 FERC ¶ 61,217, at P 14 (2018); \nAppalachian Power Co., 170 FERC ¶ 61,196, at P 59 (2020)). \n815  Id. at 25-26. \n816  Id. at 34. \n817  Id at 28. \n331 of 515"},{"page":42,"startToken":17283,"endToken":17684,"text":"Documerft AceessigiqSA 4q-Aeg-18_3cpp_Iment:Flitd doge: A3),48/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 175 - \nhave authority to dictate timelines to transmission owners to complete their studies, given \nthat load integration studies are a matter of local transmission planning. \n363.\nPJM also alleges that concerns that PJM will reject transmission service requests \nwithout basis are unfounded.818  PJM maintains that it will generally grant requests for \nNITS and FCD transmission service, and PJM will grant Interim NITS requests \nconsistent with the results of any study/studies. As to NFCD transmission service, PJM \nexplains that, if it denies a request in whole or in part, PJM will provide a written \nexplanation to the customer of PJM's reasoning for the denial, which could form the \nbasis for any complaint to the Commission. \n364.\nMoreover, PJM argues that the illustrative tariff puts all parties on sufficient notice \nas to how PJM will determine whether it can provide the requested transmission service \nand the study procedures to arrive at that determination.819  PJM asserts that the \nillustrative tariff provides the standard to which PJM will evaluate the requests—whether \nthe requested level of service can be provided reliably. \n365.\nIndicated TOs concede that more detail regarding the study processes for the new \ntransmission services could be helpful, but they argue that commenters' concerns as to \nthe potential for delays and undue discrimination are overstated. Indicated TOs contend \nthat it is appropriate and consistent with the Commission's rule of reason to reference the \nneed to incorporate each transmission owner's technical requirements in the Tariff while \nomitting the details. Indicated TOs do not oppose making explicit in the Tariff that the \nstudies referred to are those that the transmission owners will conduct to integrate large \nload facilities. Indicated TOs reject claims that they will use their role in the study \nprocess to delay or deny Co-Location Arrangements or discriminate against Co-Located \nLoad.82° \n366.\nConstellation requests that the Commission deter delays and potential disputes by \n(1) establishing deadlines for studies and other transmission owner approvals or \nconsultation requirements, and (2) require PJM's and transmission owners' standards, \nrequirements, guidance, and practices on Co-Location Arrangements to be on file with \nthe Commission on a standalone basis or reflected in the Tariff.821 \n818  Id \n819  Id. at 30. \n82°  Indicated TOs Reply Brief at 9-11. \n821  Constellation Reply Brief at 11-12. \n332 of 515"},{"page":43,"startToken":17684,"endToken":18033,"text":"Document - Acces-sigl?Sg 242-YRI. 8 - 3I? \nument:FlAd  ?age: A33/41.8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 176 - \n367. PJM argues that Vistra oversimplifies the provision of non-firm transmission \nservice.822  PJM states that it is not the case that the transmission system has significantly \nunderutilized capacity to provide the envisioned services. PJM alleges that it needs to \ncarefully identify and manage operational risk instead of spontaneously managing \nnon-firm load under an increasingly stressed system. Constellation also argues that PJM \nshould clarify how it will determine the future and real-time availability of NFCD \ntransmission service, which should be based on when transmission capacity is available \nand not needed by firm customers, consistent with the December Order.823 \nd. \nAnswers  \n368. Constellation argues that the Commission has jurisdiction to regulate load \nintegration studies in connection with jurisdictional transmission service.824 \nConstellation contends that the Commission should exercise jurisdiction over the load \nintegration studies needed to provide jurisdictional transmission service and direct that \nthese studies be on file, including study deadlines and violations to be studied.825 \n369. Indicated TOs argue that transmission owner processes for studying the integration \nof new retail loads do not implicate the Commission's jurisdiction, even though such \nstudies will be used as an input in PJM's process for studying applications for the new \ntransmission services.826  Indicated TOs point out that, even as to studies for \nCommission-jurisdictional services, the Commission does not require transmission \nproviders to file studies.827  Indicated TOs maintain that, if an Eligible Customer disputes \nthe outcome of PJM's study process for the new transmission services, the customer can \nseek redress through the Commission. \ne. \nDetermination \n370. We find that PJM's proposal regarding study procedures for FCD and NFCD \ntransmission services is not sufficiently detailed to be just and reasonable, and we direct \n822  PJM Reply Brief at 35-36. \n823  Constellation Reply Brief at 18 (citing December Order, 193 FERC ¶ 61,217 \nat P 214). \n824  Id. at 6. \n825  Id. at 7. \n826  Indicated TOs May 28 Answer at 8. \n827  Id at 9. \n333 of 515"},{"page":44,"startToken":18033,"endToken":18505,"text":"Documerit Accessig \n qq2-%gg18-3P9c ument:Flil d  ]j g9: A)3/18/2 pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 177 - \nPJM to file, as the replacement rate, more detailed study procedures that mirror the \nexisting study procedures for transmission service on compliance.828  First, with respect \nto FCD transmission service, we agree with parties on briefing that PJM's proposal is \nvague and unclear. We direct PJM to file Tariff revisions on compliance to study \nrequests for FCD transmission service using the same process PJM uses for new service \nrequests for NITS, i.e., the cluster study process.829  This requirement is just and \nreasonable because it will treat new firm transmission service requests similarly. \n371.\nPJM contends that its proposal \"has built on its existing processes for studying \nrequests for new transmission services . . . with additional processes necessary to study \nthe novel aspects of Interim NITS and [FCD and NFCD] Transmission Services.\"830 \nPJM also states that \"[e]valuation of firm service requests will require and follow similar \nstudy procedures to what is now required for NITS.\"831  However, PJM's proposal is \nlacking in detail. It is not clear whether PJM proposes to study requests for FCD \ntransmission service serially or through its existing cluster study process.832 \n372.\nRegardless, we find that it is just and reasonable to study requests for FCD \ntransmission service through PJM's existing cluster study process, and we direct PJM to \nfile Tariff revisions on compliance consistent with this directive. We find a serial study \nprocess for new FCD transmission service requests, rather than a cluster study as for new \nNITS requests, would provide disparate treatment to FCD transmission service requests. \nPJM also does not address a timeline for its study process, meaning FCD transmission \nservice requests could be studied more quickly or more slowly than requests in the new \nservices queue. PJM does not provide a reason for this difference or any explanation as \nto why such requests should not be studied in the normal cluster process for new service \nrequests. Further, studying such requests as part of the established cluster study process \n828  We discuss PJM's proposed study procedures for Interim NITS below in \nPart VI.H. \n829 PJM, Intra-PJM Tariffs, OATT, § III.32.3 Initial Study Procedures (3.0.0) (\"A \nrequest for service for which a Phase I System Impact Study is required is subject to the \nSystem Impact Study Procedures, as set forth in Tariff, Part VII or Tariff, Part VIII, as \napplicable.\"). \n830  PJM Reply Brief at 23. \n831  Id. at 26. \n832  See PJM, Initial Brief, attach. A, § 712.1 (\"After receiving the Application for \nFirm Contract Demand Transmission Service, the Transmission Provider shall determine, \nin accordance with the PJM Manuals, any necessary studies for reliably providing the \nrequested Firm Contract Demand Transmission Service.\"). \n334 of 515"},{"page":45,"startToken":18505,"endToken":18960,"text":"Docurnen't AccessigPsP; 2A-Agg18 _ 3pwument:FlAd rpo.g: c ,33/6.8/ p-Ate Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 179 - \nare willing and able to limit their energy withdrawals from the transmission system under \ncertain conditions, we further direct PJM to reflect this change in its compliance filing. \n374.\nIndicated TOs request that the Tariff specify that transmission owner load \nintegration studies will be completed first and thereby inform what additional studies are \nnecessary. However, it is not clear from the record what these studies entail, as these \nstudies are not defined in either the Tariff or any of PJM's manuals, or how transmission \nowners will study the load. For example, the record indicates that Indicated TOs view a \nload integration study for Co-Located Load as potentially analyzing \"(i) what, if any, \nupgrades are needed to accommodate the physical gross load amount behind the point of \ninterconnection.\"836  To the extent PJM intends to permit transmission owners to study \nCo-Located Load as if it were native load with NITS, that would not be just and \nreasonable for FCD and NFCD transmission services. We therefore direct PJM to \nspecify in a compliance filing, which it must submit within 60 days of the date of \nissuance of this order, how transmission owners shall participate in PJM's study process \nfor Eligible Loads for FCD and NFCD transmission services and specify in detail the \nrelated roles and responsibilities of PJM and the transmission owners in such studies. We \ndecline at this time to adopt Indicated TOs' requests to incorporate further revisions to \nthe Tariff related to load integration studies.837 \n4. \nRates and Charges \na. \nInitial Briefs \n375.\nIndicated TOs propose that the rate for the FCD transmission service be based on \nthe zonal NITS rates and underlying NITS revenue requirements.838  Indicated TOs argue \nthat Eligible Customers taking FCD transmission service on behalf of Co-Located Load \nand Network Customers should be charged the same rate because the level of service \nprovided to both is the same for all relevant purposes. For example, Indicated TOs argue \nthat both services are firm transmission services for which PJM procures capacity for the \ncustomers. Indicated TOs argue that it would be unjust and unreasonable and unduly \ndiscriminatory to charge FCD transmission service customers a rate lower than the NITS \nrate as it would subsidize FCD transmission service customers at the expense of Network \nCustomers. Indicated TOs contend that it is appropriate to use the single peak coincident \ndemand to calculate the FCD transmission service rate because it is an annual service. \n836  Indicated TOs Initial Brief at 25-26 (emphasis added). \n837  Indicated TOs Response Brief at 13, 16, 19. \n838  Indicated TOs Initial Brief at 6, 8-9. \n336 of 515"},{"page":46,"startToken":18960,"endToken":19368,"text":"Document Accessig@A 2ArACZ18-3Q@curnent:FiAd rPaqii9: A33 A8/zee Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 180 - \n376.\nIndicated TOs propose that NFCD transmission service pay a charge for the \nreserved contract demand amount multiplied by a zonal NFCD transmission service rate \ndetermined based on the specific term of service.839  Indicated TOs propose to use the \nsame FCD transmission service rate for purposes of establishing the maximum rate for \nNFCD transmission service. Indicated TOs argue that it is just and reasonable to use the \nsame maximum rate for FCD and NFCD transmission services, because the Commission \nhas permitted pricing Non-Firm PTPS at the rate used for Firm PTPS and because the \nCommission provides flexibility to arrange and schedule NFCD transmission service. \nIndicated TOs allege that NFCD transmission service is superior to Non-Firm PTPS \nbecause PJM will re-dispatch generation prior to curtailing NFCD transmission service. \nIndicated TOs propose to consider on a going-forward basis whether a discount is \nappropriate for NFCD transmission service based on system conditions and use patterns. \n377.\nIn addition to these charges, PJM proposes to assess, for FCD transmission \nservice: (1) administrative service charges, (2) ancillary service charges, (3) black start \nservice charges based on gross demand, (4) regulation charges based on gross demand, \nand (5) any redispatch costs. PJM contends that these are standard charges associated \nwith use of the transmission system above transmission service rates.84°  For NFCD \ntransmission service, PJM also proposes to assess certain charges within its authority: \n(1) administrative charges, (2) ancillary services charges, (3) any redispatch costs, \n(4) regulation charges based on gross demand, and (5) black start service charges based \non gross demand.841 \nb. \nResponse Briefs \n378.\nSeveral parties argue that it is just and reasonable to charge the same rate for FCD \ntransmission service and NITS.842  NOVEC explains that Eligible Customers are \nreceiving a service commensurate with NITS and should therefore pay a cost \ncommensurate with NITS in recognition of the Commission's cost causation principles. \nMarket Monitor asserts that if customers have the option to convert from FCD \ntransmission service to NITS in the future, and given the long timelines in transmission \nplanning and the extreme lumpiness of transmission investments, PJM must plan as if all \n839  Id. at 10, 11-13. \n840  PJM Initial Brief at 27. \n841  Id. at 36-37. \n842  ODEC Response Brief at 8; NOVEC Response Brief at 6-7; Market Monitor \nResponse Brief at 3-4. \n337 of 515"},{"page":47,"startToken":19368,"endToken":19792,"text":"Document AcceesigiSt9; qq-2 -ogg-18  _pgcument:FlAd rpaN: X303,818/2 \nto Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 181 - \nEligible Customers taking the new contract demand transmission services are Network \nCustomers. \n379.\nSome parties also agree that it is just and reasonable to use the FCD transmission \nservice rate as the maximum rate for NFCD transmission service.843  NOVEC argues that \nNFCD transmission service is a network-type service that bears a resemblance to NITS. \nNOVEC notes that because an Eligible Customer only purchases NFCD transmission \nservice when reserved, transmission costs for an Eligible Customer are lower than firm \nrates. \n380.\nOther parties disagree that the proposed rate for NFCD transmission service is just \nand reasonable.844  Vistra alleges that Indicated TOs fail to justify not offering a \ndiscounted rate for NFCD transmission service when such a discount exists for Non-Firm \nPTPS. Vistra contends that the benefit of re-dispatching generation prior to curtailment \ndoes not justify charging a substantially higher rate for a service that is otherwise inferior. \nVistra also argues that Indicated TOs' proposal is unjust and unreasonable and unduly \ndiscriminatory because it would create cost shifts between classes of transmission \ncustomers, where Eligible Customers taking NFCD transmission service on behalf of \nCo-Located Load shoulder the cost of firm transmission service, despite taking non-firm \ntransmission service. \n381.\nJoint Co-Location Developers argue that pricing NFCD transmission service at the \nsame rate as FCD transmission service is not consistent with cost causation principles or \nthe Commission's purpose in establishing the NFCD transmission service to avoid \ninefficient system buildout. Joint Co-Location Developers maintain that, as compared to \nFCD transmission service, the rate for NFCD transmission service should reflect the \nlesser costs caused by and lesser benefits received by customers taking this service.845 \nJoint Co-Location Developers claim that, in Order No. 888-A, the Commission explained \nthat, while in some circumstances non-firm transmission rates may be set at the firm \ntransmission rate level, the Commission expects that non-firm transmission rates would, \nin most instances, be priced below the price cap.846 \n382.\nGeronimo Power states that, combined with PJM's proposed requirement that an \nEligible Customer take NFCD transmission service for the portion of its load served by a \n843  ODEC Response Brief at 8; NOVEC Response Brief at 7. \n844  Vistra Response Brief at 16-17, 23-24; Joint Co-Location Developers Response \nBrief at 20; Geronimo Power Response Brief at 4. \n845  Joint Co-Location Developers Response Brief at 20-21. \n846  Id at 22 (citing Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,272). \n338 of 515"},{"page":48,"startToken":19792,"endToken":20274,"text":"Document Ac„„igPSg i21.8-34@cument:Flild J=Ag?:A33/48/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 182 - \nCo-Located Generator, the implication of the Indicated Transmission Owners' proposal \nappears to be that an Eligible Customer taking NFCD transmission service would be \nrequired to pay a transmission charge equivalent to the rate paid by transmission \ncustomers taking firm transmission service.847  Geronimo Power argues that charging \ntransmission customers taking NFCD transmission service the same amount as a \ntransmission customer taking FCD transmission service is unjust and unreasonable and \ninconsistent with cost causation principles because these loads will be required to pay a \nrate equivalent to customers receiving a higher level of service. Geronimo Power asserts \nthat non-firm transmission service should be, and often is, priced lower than firm \ntransmission service, such as in PJM where Non-Firm PTPS customers receive a discount \nas compared to Firm PTPS customers. Geronimo Power adds that the proposed rate \nwould undermine the incentive for large load customers to reduce their reliance on the \ngrid and therefore would fail to offer a rate that would encourage the efficient use of the \ntransmission system, contrary to the December Order. Further, Geronimo Power states \nthat Indicated TOs should not set an unjust and unreasonable rate based on superior \nservices while they wait until they gather more data to determine the extent to which such \nunjust and unreasonable rate should be reduced when charging for an inferior service. \n383.\nODEC agrees that it is reasonable for PJM to charge FCD and NFCD transmission \nservice customers for applicable PJM administrative charges consistent with PJM's \ncharges to existing transmission customers.848 \n384.\nODEC urges the Commission to direct further compliance filings in order to \nensure that rates for the new FCD transmission service are just and reasonable by \nrequiring the individual transmission owners to either confirm that their formula or stated \nrates and metrics reporting enable direct crediting by PJM, or provide whatever revisions \nare necessary in order to do so.849  ODEC states that this is important so that ODEC and \nother Network Customers are not subject to paying duplicative charges for the same \nrevenue requirement amount. ODEC adds that it is also important because Indicated TOs \nstate that load-serving entities will submit metrics to PJM used to calculate transmission, \ncapacity, and energy charges, but such metrics may not be consistent among Indicated \nTOs. ODEC explains that, while it is a load-serving entity, as a transmission customer \nthe metrics are provided to PJM by the transmission owners for the zones where ODEC \ntakes transmission service. \n385.\nConstellation seeks clarification that Indicated TOs' proposed rate for FCD \ntransmission service is equal to the applicable transmission owners' NITS rate calculated \n847  Geronimo Power Response Brief at 4, 6, 7-9. \n848  ODEC Response Brief at 8; see also NOVEC Response Brief at 8. \n849  ODEC Response Brief at 8-9. \n339 of 515"},{"page":49,"startToken":20274,"endToken":20698,"text":"Document Access \n;Pr; 22qZl 8 - 3P 9c ument:Flit d rEg9:c3,0/(18/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 183 - \nusing that transmission owners' coincident peak methodology, given that different \ntransmission owners use different methods.85° \n386.\nIndustrials/Amtrak argue that the Commission must ensure that transmission \nowners' calculation of individual customer and zonal transmission cost allocation is \ntransparent, whether through an Attachment M-2 filing or another publicly transparent \nand accountable method.851  Industrials/Amtrak also contend that the Commission must \nprovide direction on how the revenue and the billing determinants for FCD and NFCD \ntransmission services and Interim NITS would be incorporated into existing transmission \nformula rates. Similarly, Geronimo Power states that the Commission should at a \nminimum require the Indicated Transmission Owners to clarify the nature of the rates and \nbilling determinants that they are proposing, including whether they intend to charge the \nNFCD transmission service charge on a MWh basis, which would be inconsistent both \nwith how transmission reservation charges are historically structured and the Tariff.852 \n387.\nIndustrials/Amtrak argue that neither FCD nor NFCD transmission service provide \na cost-based back-up service for cogeneration QFs and similarly-situated retail \ncustomers.853  Industrials/Amtrak contend that, because it would require payment for \nservice based on the contracted amount, FCD transmission service inherently assumes \nthat forced outages or other reductions in electric output by all QFs will occur \nsimultaneously, or during the system peak, or both, without any factual data to support \nthat assumption.854  Industrials/Amtrak aver that this is not a realistic assumption for \ncogeneration QFs. Industrials/Amtrak further argue that it would not comport with cost \ncausation principles to require a FCD transmission service reservation for occasional \nback-up power needs, particularly where the history and risk of the individual unit is \nwell-established or has met outside standards. Industrials/Amtrak further argue that \nNFCD transmission service also falls short because it requires pre-scheduling with and \napproval by PJM, which is inconsistent with back-up power's use in the event of forced \noutages, and because it is an as-available product that is subject to interruption.855 \nIndustrials/Amtrak argue that, if the existing netting construct is no longer available, then \na firm transmission service must be available for QFs to meet the requirements of \n850 Constellation Response Brief at 31. \n851  Industrials/Amtrak Response Brief at 25-26. \n852  Geronimo Power Response Brief at 5 n.13. \n853  Industrials/Amtrak Response Brief at 16-19. \n854  Id. at 17 (citing Dauphinais Aff. ¶ 44). \n855  Id at 18. \n340 of 515"},{"page":50,"startToken":20698,"endToken":21095,"text":"Document AccessigRSg 2q-'21.8-3Q9c ument:FlAd rFa'qp: A4A8/2PAte Filed: 10116/2026 \nDocket No. EL25-49-002, et al. \n- 184 - \nPURPA based on actual use. Industrials/Amtrak contend that there must be a \ntransmission service that applies cost causation standards to occasional, unplanned use of \nthe transmission system. \n388.\nIndustrials/Amtrak argue that cost causation principles dictate that the \nCommission should authorize cost-based back-up service for all transmission customers, \nnot only QFs.856  Industrials/Amtrak explain that there are a number of facilities that \noperate on similar principles to QFs but do not maintain QF status for a variety of \nreasons. Industrials/Amtrak argue that these facilities, too, must occasionally draw from \nthe grid, including for occasional unscheduled outages. Industrials/Amtrak argue that it \ncannot be just and reasonable or comport with cost causation principles to require \nfacilities requiring only occasional back-up service to pay rates that are the same as FCD \ntransmission service or gross-based NITS. Industrials/Amtrak argue that transmission \ncustomers should be charged based on actual use on an hourly basis and should not be \ncharged a standby fee. \n389.\nIndustrials/Amtrak explain that QFs are entitled to supplementary power, back-up \npower, maintenance power, and interruptible power pursuant to Commission \nregulations857  and that the rates for back-up power \"[s]hall not be based upon an \nassumption (unless supported by factual data) that forced outages or other reductions in \nelectric output by all [QFs] on an electric utility's system will occur simultaneously, or \nduring the system peak, or both.\"858  Industrials/Amtrak argue the NITS BTMG netting \nconstruct meets the requirements of PURPA's enacting regulations. \nc. \nReply Briefs  \n390.\nIn response to Constellation's request for clarification, Indicated TOs clarify that \nthe zonal FCD transmission service rate will be calculated using that transmission \nowner's specific methodology applicable to Network Customers.859 \n391.\nNOVEC explains that because under PJM's proposal a transmission customer \nwould only take and pay for NFCD transmission service when the generator was \nexperiencing an outage, the same rate does not equate to the same cost to the customer.86° \n856  Id at 20-22, 24. \n857  Industrials/Amtrak Response Brief at 14-16 (citing 18 C.F.R. § 292.305(b)). \n858  Id. at 15 (citing 18 C.F.R. § 292.305(c)(1)). \n859  Indicated TOs Reply Brief at 18 (citing Constellation Response Brief at 31). \n860 NOVEC Reply Brief at 10-13. \n341 of 515"},{"page":51,"startToken":21095,"endToken":21553,"text":"DocumenE Accessig#SP; 22qAqA18 _31).pcument:Flild jag9: A4,A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 185 - \nNOVEC argues that NFCD transmission service does not impose fewer costs on the \ntransmission system than NITS, just \"imposes costs differently\" and contends that the \nCommission needs to be cautious to avoid providing \"co-located generators a subsidized \nlow cost option to use the system whenever they need backup.\"861  NOVEC argues that \nCo-Located Load in areas where PJM can accommodate a large amount of NFCD \ntransmission service could end up with the best of both worlds, where they are very rarely \ncurtailed but pay a subsidized rate for transmission service, with the option to switch \nfrom FCD transmission service or NITS if PJM can no longer accommodate the required \nlevel of NFCD transmission service. \n392.\nIn response to arguments from Joint Co-Location Developers and Geronimo \nPower about whether it is appropriate to establish NFCD transmission service rates based \non FCD transmission service rates, Indicated TOs argue that transmission owners need to \ngather data on how NFCD transmission service customers are using the service and the \neffect of that utilization on the transmission system.S62  Indicated TOs argue that it is not \nclear whether NFCD transmission service customers will cause the need for fewer \nNetwork Upgrades, and that further analysis is needed to determine whether discounts are \nappropriate. Finally, Indicated TOs contend that Joint Co-Location Developers' concerns \nthat the proposed NFCD transmission service rate will discourage industrial development \nare exaggerated and misplaced. NOVEC similarly argues that it is not the Commission's \nplace to subsidize certain industries at the expense of customers.863 \n393.\nIn response to Vistra's arguments about applying the rate for zonal Non-Firm \nPTPS to NFCD transmission service, Indicated TOs argue that doing so would be \nunreasonable because transmission customers have used Non-Firm PTPS exclusively to \nfacilitate the delivery of specific generation to the PJM border—not for internal use.864 \nNOVEC also rejects Vistra's argument that NFCD transmission service should receive \nthe same rate as Non-Firm PTPS, arguing that it would not be appropriate to allow NFCD \ntransmission service the same discount as Non-Firm PTPS because the two products \nfundamentally differ. Indicated TOs further argue that the discounted Non-Firm PTPS \nrate reflects historical use and was neither intended nor appropriate for NFCD \ntransmission service because NFCD transmission service is intended to be a limited, \nsupplemental service within PJM and does not facilitate the delivery of specific \ngeneration to specific load over a contract path. Indicated TOs also contend that NFCD \n861  Id. at 12 (citing Market Monitor Response Brief at 6). \n862  Indicated TOs Reply Brief at 19-21. \n863  NOVEC Reply Brief at 14. \n864  Indicated TOs Reply Brief at 13, 18-19. \n342 of 515"},{"page":52,"startToken":21553,"endToken":21941,"text":"Document AccessigiPA 242-16A18-31?@cument:Flit d  rpa@g9: A4/48/2PAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 186 - \ntransmission service is superior to Non-Firm PTPS because it has a superior curtailment \npriority. \n394.\nIndicated TOs reject Vistra's argument that Indicated TOs' proposal to credit the \nrevenues associated with NFCD transmission service to customers taking NITS and FCD \ntransmission service will create unjustified cost shifts among customer classes.865 \nIndicated TOs argue that these revenue credits are not subsidies but offsets that reduce \nthe amount paid by firm transmission service customers, which is appropriate because \ntransmission rates are designed to recover the fixed costs of building and maintaining the \ntransmission system to provide service to such customers. In the absence of such credits, \nIndicated TOs argue that the transmission owners would over-recover their revenue \nrequirements. Indicated TOs further argue that the revenue crediting mechanism is fully \nconsistent with previously approved mechanisms such as section 27A, which credits \nNon-Firm PTPS revenue to Network and Firm PTPS customers. \n395.\nIndustrials/Amtrak argue that NFCD transmission service cannot provide back-up \npower because it cannot be accessed during a BTMG generation facility outage until a \nrequest for it is submitted to and approved by PJM.866  Industrials/Amtrak further argue \nthat NFCD transmission service is also only available on an as-available basis and is \nsubject to both operational and automated interruption.867  Industrials/Amtrak explain \nthat, during a forced outage, a retail customer would be required to automatically curtail \nload until it submits a NFCD transmission service request and PJM approves that request. \n396.\nIndustrials/Amtrak also argue that FCD transmission service can provide \nmaintenance power on a firm basis, but like back-up power, cannot do so at a cost lower \nthan gross load NITS because it implicitly assumes BTMG maintenance outages cannot \nbe scheduled to avoid peak periods.868 \nd. \nAnswer \n397.\nGeronimo Power argues that Indicated TOs' proposed rate for NFCD transmission \nservice is unjust and unreasonable, will disincentivize Co-Located Loads from relying on \nNFCD transmission service, and lead to less efficient use of the transmission system.869 \n865  Id. at 31-32 (citing Vistra Response Brief at 23-25). \n866  Industrials/Amtrak Reply Brief at 8. \n867  Id at 8 n.13. \n868  Id at 9 n.16. \n869  Geronimo Power May 21 Answer at 8. \n343 of 515"},{"page":53,"startToken":21941,"endToken":22339,"text":"D'ocunient-AccessigSp qq,236,g-18 _3RpumentAil d rfal@g: A4A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 187 - \nGeronimo Power asserts that Indicated TOs offer no meaningful response to the question \nof what is a just and reasonable rate for NFCD transmission service. Geronimo Power \nargues that the mere fact that Commission policy allows PJM transmission owners to \ncharge up to the firm rate in some cases does not mean that doing so here is just and \nreasonable.87°  Geronimo Power avers that there should be little doubt that some form of \ndiscount must be applied as to NFCD transmission service. \ne. \nDetermination \n398.\nWe agree with Indicated TOs that it is just and reasonable to base the rate for FCD \ntransmission service on the zonal NITS rates and underlying NITS revenue \nrequirements871  and direct the PJM transmission owners, as the replacement rate, to \nsubmit a compliance filing within 60 days of the date of issuance of this order that \nincludes Tariff revisions to effectuate this proposal. Both FCD transmission service and \nNITS will provide a similar level of firm transmission service, and PJM will plan the \ntransmission system to ensure that it is able to provide both transmission services on a \nfirm basis .872 \n399.\nWe find unjust and unreasonable PJM's proposal to charge Eligible Customers \ntaking FCD or NFCD transmission services on behalf of Co-Located Loads for all \nancillary services other than regulation and black start based on total quantity of MWhs \nof energy delivered to the Co-Located Load.873  In the December Order, the Commission \nfound that Eligible Customers taking the new FCD transmission service on behalf of \nCo-Located Loads must be charged for ancillary services based on the contract demand, \nwith the exception of regulation and black start services.874  Similarly, the Commission \nfound that Eligible Customers taking the NFCD transmission service on behalf of \nCo-Located Loads must be charged for ancillary services on an as-reserved contract \ndemand basis, based on the reserved contract demand amount of transmission service, \nwith the exception of regulation and black start services.\"' \n870  Id at 9. \n871  Indicated TOs Initial Brief at 6. \n872  Id at 8-9; December Order, 193 FERC ¶ 61,217 at PP 195, 208. \n873  PJM, Initial Brief, attach. A, Subpart B, §§ 714.5 & 715.4. \n874  December Order, 193 FERC ¶ 61,217 at P 209. \n875  Id P 216. \n344 of 515"},{"page":54,"startToken":22339,"endToken":22833,"text":"Document Accessig@Sg 2qACItql8-3P9cUrnent:FlAd rg@g9: A4A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 188 - \n400.\nHowever, we find just and reasonable PJM's proposal to charge Eligible \nCustomers taking FCD and NFCD transmission services on behalf of Co-Located Loads \nfor regulation and black start services based on gross demand, which is consistent with \nthe Commission's findings in the December Order. The Commission found in the \nDecember Order that \"Eligible Customers that take the Firm Contract Demand \ntransmission service on behalf of Co-Located Loads must be charged for regulation and \nblack start services based on a gross demand basis, rather than the contract demand\" \nbecause all Co-Located Loads rely on regulation and black start services to be served \nregardless of whether they are withdrawing energy from the transmission system.876 \nLikewise, the Commission found in the December Order that \"Eligible Customers that \ntake the Non-Firm Contract Demand transmission service on behalf of Co-Located Loads \nuse and therefore should be charged for regulation and black start services based on a \ngross demand basis, rather than the reserved amount of transmission service.\"877 \nTherefore, and consistent with our determination above to extend the three new \ntransmission services set forth in the December Order to Eligible Customers taking \nservice on behalf of load with BTMG that are willing and able to limit their energy \nwithdrawals from the transmission system under certain conditions, we direct PJM to \nsubmit a compliance filing within 60 days of the date of issuance of this order that revises \nits Tariff to: (1) charge Eligible Customers taking FCD and/or NFCD transmission \nservices on behalf of Eligible Loads for all ancillary services other than regulation and \nblack start services based on their contract demand; and (2) charge Eligible Customers \ntaking FCD and/or NFCD transmission services on behalf of Eligible Loads for \nregulation and black start services based on their gross load. \n401.\nWe also find just and reasonable PJM's proposal to charge Eligible Customers \ntaking FCD and/or NFCD transmission services certain administrative charges. As PJM \nexplains, these are standard charges associated with use of the transmission system above \ntransmission service rates.S78  For the same reason, we find just and reasonable PJM's \nproposal to charge Eligible Customers taking FCD and/or NFCD transmission services \nredispatch costs to cover congestion-related costs, given that both of these services will \nbe pool-scheduled and can be served by generators redispatched to mitigate congested \ntransmission paths. We thus direct PJM to submit a compliance filing, within 60 days of \nthe date of issuance of this order, that revises its Tariff to implement these charges. \nConsistent with our determination above to extend the three new transmission services set \nforth in the December Order to Eligible Customers taking service on behalf of load with \nBTMG that are willing and able to limit their energy withdrawals from the transmission \n876  Id P 209. \n877 M. P 216. \n878  PJM Initial Brief at 27. \n345 of 515"},{"page":55,"startToken":22833,"endToken":23292,"text":"Document AccessigPsg 22q-20qA-18 _3q@cument:Flil d rpaN9: ALIA812 PAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 189 - \nsystem under certain conditions, we further direct PJM to reflect this change in its \ncompliance filing. \n402.\nHowever, we are not persuaded that Indicated TOs' proposal to set the maximum \nrate for NFCD transmission service equal to the rate for FCD transmission service is just \nand reasonable. In the December Order, the Commission was clear that NFCD \ntransmission service would \"provide an option for Eligible Customers seeking to use the \ntransmission system on behalf of a Co-Located Load in this more limited manner.\"879 \nFurther, NFCD transmission service is non-firm and curtailed prior to FCD transmission \nservice and NITS.88°  NFCD transmission service is therefore an inferior service to FCD \ntransmission service and NITS, and we find that the just and reasonable replacement rate \nhere should not charge the same maximum rate for these transmission services. We \nacknowledge NOVEC's argument that under PJM's proposal, an Eligible Customer \nwould only take and pay for NFCD transmission service when the generator serving it is \nexperiencing an outage, so the same rate does not equate to the same cost to the Eligible \nCustomer.881  However, the same rate could apply to Eligible Customers taking the same \namount of FCD and NFCD transmission services. \n403.\nWe also find that charging the same maximum rate for both FCD and NFCD \ntransmission services can undermine the benefits of the new NFCD transmission service \nfor other transmission customers. Specifically, discounting non-firm transmission \nservices encourages transmission customers to use such services, which benefits all \ntransmission customers by maximizing use of the existing transmission system. These \nbenefits accrue to other transmission customers in two ways. First, the revenues related \nto NFCD transmission service will become a credit to, and thus offset, the transmission \nrevenue requirement, which is the basis for the rates that firm transmission customers are \ncharged. Moreover, utilizing NFCD transmission service can avoid unnecessary Network \nUpgrades, the costs of which would likely be allocated to all firm transmission service \ncustomers. \n404.\nFurther, pricing NFCD transmission service at the same rate as FCD transmission \nservice is not consistent with cost causation principles or the December Order's findings. \nSpecifically, the Commission found that requiring an Eligible Customer taking \ntransmission service on behalf of Co-Located Load to take NITS on a gross demand basis \nwould be inefficient, and could necessitate costly transmission buildout and costs paid by \ntransmission customers that may not be necessary if Eligible Customers taking \ntransmission service on behalf of Co-Located Loads are willing and able to limit their \n879  December Order, 193 FERC ¶ 61,217 at P 214 (emphasis added). \n88°  See infra Part VI.G. \n881  NOVEC Reply Brief at 10. \n346 of 515"},{"page":56,"startToken":23292,"endToken":23716,"text":"Document Acce„igRSg 21Ag67.8-349curnent:FlAd rPA99: \nA8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 190 - \nenergy withdrawals from the transmission system under certain conditions and take a \ntransmission service that requires fewer or less costly Network Upgrades to provide.882 \nAs noted above, the Commission directed the creation of NFCD transmission service, \nfinding that it would provide an option for Eligible Customers taking service on behalf of \nCo-Located Loads that seek to use the transmission system in a more limited manner.883 \nThe December Order further found that Eligible Customers taking service on behalf of \nCo-Located Loads should be allowed to choose the transmission service that aligns with \ntheir use of the transmission system and therefore aligns the charges for service with the \nbenefits received.884  Indicated TOs' proposal fails to comply with the directive in the \nDecember Order by charging the same rate for FCD and NFCD transmission services; the \nproposal does not align the charges for transmission service with the benefits received. \n405.\nOur finding here is also consistent with Commission precedent. In Order No. 888, \nthe Commission determined that the rate for Non-Firm PTPS \"is capped at the firm \nrate.\"S85  In response to Order No. 888, Duquesne sought clarification that the phrase \"the \nnon-firm rate is capped at the firm rate\" does not mean the Commission is deviating from \nits principles that non-firm transmission service must be priced in a manner that reflects \nthe interruptibility of the service and is economically efficient.886  The Commission \nclarified that the Firm PTPS transmission rate represents a maximum price for non-firm \ntransmission service and emphasized that \"non-firm transmission prices should reflect the \ninterruptibility of the service and should promote efficient use of the transmission system, \nsubject to this price cap.\"887  The Commission concluded that, \"while in some \ncircumstances non-firm transmission rates may be set at a firm transmission rate level, \nthe Commission expects that non-firm transmission rates would, in most instances, be \npriced below the cap.\"888 \n406.\nThus, while the Commission recognized that the Firm PTPS transmission rate \ncould be a ceiling for the Non-Firm PTPS rate, the Commission also recognized that the \nrates should vary based on the quality of the transmission service. Our finding here is \nS82  December Order, 193 FERC ¶ 61,217 at P 199. \n883  Id. P 214. \n884 1d. P  199. \n885  Order No. 888, FERC Stats. & Regs. ¶ 31,036 at 31,743. \n886  Order No. 888-A, FERC Stats. & Regs. ¶ 31,048 at 30,272. \n887 Id. \n888 Id. \n347 of 515"},{"page":57,"startToken":23716,"endToken":24213,"text":"Document AcceeeigPSK q.A6,18- 312@cUrnent:Flita rf)A9: 0,_8/2PAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 191 - \nconsistent with Order No. 888 (i.e., that non-firm transmission service rates should \ngenerally be priced below firm transmission service rates). Indicated TOs propose \nmaking the exception the rule and thus fail to justify that deviation. Indicated TOs argue \nthat NFCD transmission service is a superior level of service compared to Non-Firm \nPTPS. But, even assuming that statement is correct, it does not follow that NFCD \ntransmission service is therefore a similar level of service as FCD transmission service or \nNITS. \n407.\nWe recognize that Indicated TOs state that they will consider offering discounts \nfor NFCD transmission service after an initial assessment period to determine whether a \ndiscount would encourage efficient use of the transmission system. However, Indicated \nTOs miss the point of not only aligning the rate with the quality of the service provided, \nbut also designing a rate that incentivizes efficient non-firm uses of the transmission \nsystem. It is counterintuitive to expect charging the full rate to inform an analysis of \nwhat discounts may be appropriate. Therefore, we find that the possibility of offering \ndiscounts at some undefined time in the future is not sufficient to remedy our concerns \nwith their proposal. Under that proposal, Indicated TOs would have no obligation to \nlower rates in the future and offer no transparency as to how or when that decision would \nbe made; moreover, they provide no compelling explanation as to why it would be just \nand reasonable to charge for NFCD transmission service at the FCD transmission service \nrate in the interim. \n408.\nWe further disagree with NOVEC's characterization of a lower rate for NFCD \ntransmission service as subsidized; as discussed in the body of this order, we find that a \nlower rate for NFCD transmission service is just and reasonable and consistent with cost \ncausation. A lower rate for NFCD, as compared to FCD, transmission service will also, \nas NOVEC points out, incentivize transmission customers to use the service in areas \nwhere PJM can accommodate a large amount of NFCD transmission service. This is \nexactly the point—Eligible Customers taking transmission service on behalf of Eligible \nLoads will be incentivized to take NFCD transmission service in areas where there is \nexcess transmission capacity, and the charges recouped from those customers will offset \nthe rates paid by firm transmission customers that funded the excess transmission \ncapacity. Otherwise, this transmission capacity would remain unused and firm \ntransmission customers would pay more. \n409.\nNOVEC also argues that in areas where PJM can accommodate a large amount of \nNFCD transmission service, Co-Located Load could end up with the best of both worlds, \nwhere they are rarely curtailed but Eligible Customers taking transmission service on \ntheir behalf pay a subsidized rate for transmission service, with the option to switch to \nFCD transmission service or NITS if PJM can no longer accommodate the required level \n348 of 515"},{"page":58,"startToken":24213,"endToken":24613,"text":"Document AccesSigi@\"7F': 2fir2-\n1.8- 34@cument:Flil d \nA4,4 8  / 2  pAte Filed: 10;16/2026 \nDocket No. EL25-49-002, et al. \n- 192 - \nof NFCD transmission service.889  We disagree that Eligible Customers could \"simply \nswitch\" to FCD transmission service or NITS if PJM can no longer accommodate the \nrequested level of NFCD transmission service.89°  The process to request NITS remains \nunchanged, and we address the process to request FCD transmission service above. But \nin either case, provision of firm transmission service will be studied, granted to the extent \nit can be done so reliably, and only available following construction of any required \nNetwork Upgrades. \n410.\nWith respect to Industrials/Amtrak's argument that neither FCD nor NFCD \ntransmission services provide a cost-based back-up service for cogeneration QFs and \nsimilarly-situated retail customers,891  this argument is substantively similar to the \nargument the same parties raised on compliance, which is addressed supra.\"' \nIndustrials/Amtrak contend that, because it would require payment for service based on \nthe contracted amount, FCD transmission service inherently assumes that forced outages \nor other reductions in electric output by all QFs will occur simultaneously, or during the \nsystem peak, or both, without any factual data to support that assumption.893  However, as \nnoted above, this argument appears to conflate rates for sales of back-up power and rates \nfor transmission service, rendering Industrials'/Amtrak's concerns misplaced. \n411.\nIndustrials/Amtrak further argue that it would not comport with cost causation \nprinciples to require a FCD transmission service reservation for occasional back-up \npower needs and that NFCD transmission service will not be useful for back-up power \nbecause it must be requested in advance.894  Again, Industrials/Amtrak appear to conflate \nback-up power for QFs under PURPA with the subject of this proceeding, which is \ntransmission service taken by Eligible Customers serving Eligible Loads. Further, \nIndustrials/Amtrak state that their concerns are for \"whether retail customers can access \ncost-based . . . back-up service\"895  but, with the exception of Eligible Customers that are \nretail customers taking unbundled transmission service, service available to retail \ncustomers is neither the subject of this proceeding nor within the Commission's \n889  NOVEC Reply Brief at 12-13. \n898  Id. \n891  Industrials/Amtrak Response Brief at 16-17. \n892  See supra Part V.A.3. \n893  Industrials/Amtrak Response Brief at 17 (citing Dauphinais Aff. ¶ 44). \n894  Id at 18. \n895  Id. at 11 (emphasis added). \n349 of 515"},{"page":59,"startToken":24613,"endToken":25068,"text":"Dodinnerit Acce-sa-igiSA: Z-q-Ag-18_3cp9ument:FlAd rj=)Ag: A5/0.8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 193 - \njurisdiction. However, to the extent Industrials/Amtrak refer to jurisdictional wholesale \ntransmission service when arguing that \"examples exist of bespoke arrangements for \nindustrial and institutional customers that may require firm back-up needs,\"S96  we \ncontinue to find it just and reasonable that Eligible Customers taking NITS be charged on \na gross demand basis as explained in the December Order, with limited exceptions.897 \nNetwork Load has the right to be served from the transmission system at any time, and \nPJM and the transmission owners incorporate Network Load into their transmission \nplanning to ensure that they can fulfill their obligation to provide such service. Thus, \nregardless of whether certain transmission customers that elect NITS to be able to take \ntransmission service on demand choose to only take such service occasionally, the system \nwill be planned to accommodate them at all times. We therefore continue to find that the \nbenefits of NITS align with charging for NITS based on gross demand. We further \nreiterate that, as discussed in this order, we have set aside, in part, the December Order to \nextend the three new transmission services set forth in the December Order to Eligible \nCustomers taking service on behalf of load with BTMG that are willing and able to limit \ntheir energy withdrawals from the transmission system under certain conditions.898 \n412.\nTherefore, we direct the PJM transmission owners to submit, within 60 days of the \ndate of issuance of this order, a compliance filing with the Tariff charges for NFCD \ntransmission service in accordance with this order. Specifically, the PJM transmission \nowners must propose a lower maximum rate or non-discriminatory discounts for the \nNFCD transmission service rate. Moreover, the PJM transmission owners must ensure \nthat their proposed Tariff revisions are transparent as to how charges will be calculated \nfor an individual transmission customer. Consistent with our determination above to \nextend the three new transmission services set forth in the December Order to Eligible \nCustomers taking service on behalf of load with BTMG that are willing and able to limit \ntheir energy withdrawals from the transmission system under certain conditions, we \nfurther direct the PJM transmission owners to reflect this change in their compliance \nfiling. \n5. \nOther \na. \nInitial Briefs  \n413.\nPJM states that any request for FCD and/or NFCD transmission service must \ncomply with Commission regulations for new service requests, and include several items \nspecific to these transmission services, such as a description of the supply characteristics \n896  Id at 12. \n897  December Order, 193 FERC ¶ 61,217 at PP 186, 195. \n898  See supra Part IV.C.1.b.i. \n350 of 515"},{"page":60,"startToken":25068,"endToken":25504,"text":"Document Accessig@Sg 2A\"2-1C7418-3Q9cUMent:Filtd IPV: A15 A8/ 2 pate Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 194 - \nof the Co-Located Generator and the demand characteristics of the Co-Located Load.899 \nUpon receiving an application, PJM will evaluate whether the requested level of Contract \nDemand transmission service can be reliably provided. PJM then explains that the \nEligible Customer must meet several conditions precedent, such as certifying that it is \nwilling and able to limit withdrawals from the transmission system when requested by \nPJM and providing PJM with an authorization or certification from its Relevant Electric \nRetail Regulatory Authority (RERRA) affirming that the Eligible Customer is authorized \nto provide energy to the Co-Located Load. PJM also proposes to require that certain \nfacilities and necessary technical arrangements must be completed prior to \ncommencement of requested service. \n414.\nPJM next explains that, under the Service Agreement for Contract Demand \ntransmission service, service is presumed to continue without expiration, and that there \nare several bases for termination.900  For example, PJM explains that service can \nterminate on 42 months' notice prior to the commencement of a delivery year, and PJM \nargues that this is appropriate because the contract demand level under FCD transmission \nservice will be accounted for in PJM's capacity market. PJM proposes circumstances \nwhereby PJM may terminate service for cause: (1) the Eligible Customer breaches its \nobligations, such as materially changing the Co-Location Arrangement without PJM \nstudying it; or (2) the Eligible Customer is disqualified by failing to follow an operating \ninstruction to curtail or shed load, or after the misoperation, on more than one occasion, \nof any necessary control technologies or required protection systems (described further \nbelow). \n415.\nPJM next proposes that the Eligible Customer designate the Co-Located Load and \nthe Co-Located Generator and provide the MW level of energy from the Co-Located \nGenerator dedicated to serving the Co-Located Load.901  For reliability purposes, PJM \nstates, the Eligible Customer must provide PJM with timely written or electronic notice \nof material changes in the demand characteristics of the Co-Located Load or the supply \ncharacteristics of the Co-Located Generator. PJM maintains that necessary control \ntechnologies and protection systems for NFCD transmission service will be designed \nbased on the specific circumstances of each Co-Location Arrangement, and PJM's ability \nto reliably operate the system could be impaired by any material changes to the control \ntechnologies or protection systems. PJM proposes to prohibit an Eligible Customer from \nusing FCD transmission service for the sale of either capacity or energy to loads other \n899  PJM Initial Brief at 17-19. \n900  Id. at 20-22. \n981  Id. at 22-24. \n351 of 515"},{"page":61,"startToken":25504,"endToken":25933,"text":"Document Ac„s igi@SP; Q -16A-1.8-3F-A;Cument:Flild ]Egg A5A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 195 - \nthan the Co-Located Load designated in its Service Agreement or the transmission \nservice to third parties. \nb. \nResponse Briefs \n416.\nODEC requests clarification regarding how PJM's requirement that an Eligible \nCustomer taking transmission service on behalf of a Co-Located Load provide PJM with \nan authorization or certification from its RERRA which affirms that the Eligible \nCustomer is authorized to provide energy to the Co-Located Load would apply to a \ngeneration and transmission electric cooperative like ODEC.902  ODEC states that it is \nunclear whether PJM intends that ODEC, as an Eligible Customer, would need to provide \ncertification that ODEC' s member distribution cooperatives (which are the RERRA in \nMaryland and Delaware) have authorized ODEC to provide energy to the Co-Located \nLoad. ODEC adds that, where the state regulatory agency is the RERRA, ODEC is \nunaware of a procedure whereby it would obtain authorization from the Virginia State \nCorporation Commission to provide energy to Co-Located Loads. \n417.\nConstellation opposes PJM's proposal that the Eligible Customer must submit an \nauthorization or certification from the RERRA affirming that the Eligible Customer is \nauthorized to provide energy to the Co-Located Load.903  Constellation argues that, if the \ngenerator is the Eligible Customer, it is unreasonable to require that generator to go to the \nstate commission for a special approval if the load is in a retail competition state. \nConstellation maintains that the Eligible Customer need only show that the load will be \nserved by a transmission owner or licensed competitive retail supplier. \n418.\nIndustrials/Amtrak argue that Co-Located Load on whose behalf an Eligible \nCustomer takes NFCD transmission service should have firm natural gas capacity or \nother adequate alternatives to be able to utilize the service. Industrials/Amtrak argue this \nrequirement will prevent \"misuse\" of NFCD transmission service \"by generators who \nhave the ability to operate but may want to rely on the grid when it appears to be more \neconomical for that generator.\"9°4  Industrials/Amtrak explain that, from a resource \nadequacy perspective, policies surrounding NFCD transmission service should encourage \nloads to bring their own generation. \n419.\nIndicated TOs request that PJM add to section 710.1 of PJM's illustrative tariff \nprovisions, as a condition precedent for receiving FCD or NFCD transmission service, a \nrequirement that the Eligible Customer satisfy any load-connection related requirements \n9°2  ODEC Response Brief at 6-7. \n903 Constellation Response Brief at 29. \n9°4  Industrials/Amtrak Response Brief at 24. \n352 of 515"},{"page":62,"startToken":25933,"endToken":26321,"text":"Document A„„sig±Plf; \n-filgoq18-34Pcurnent:Flita \n@g9: A5A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 196 - \nimposed by the applicable PJM transmission owner.905  Indicated TOs argue that PJM \nshould add language to the list of information in section 710.2 of PJM's illustrative tariff \nprovisions to be provided in an application for FCD and/or NFCD transmission service to \nthe effect that the customer has met applicable load interconnection study obligations. \nIndicated TOs request that PJM add a placeholder section for listing required control \ntechnologies or protection systems to section 5.0 of PJM's proposed Attachment F-4.906 \n420.\nIndicated TOs request that PJM clarify whether the use of \"Delivery Point\" in \nsection 710.2 subsection (iii) and subclause (i) of section 710.5 is appropriate in light of \nPJM's proposed definition of Co-Located Load, which is based on facilities located on \nthe same side of the Point of Change in Ownership.\"' \n421.\nIndicated TOs contend that PJM should clarify in section 711.3 of PJM's \nillustrative tariff provisions or in PJM's manuals what constitutes \"material changes\" for \npurposes of the annual information updates to be provided by Eligible Customers.908 \nIndicated TOs argue that PJM should revise section 712.2 of PJM's illustrative tariff \nprovisions to require PJM to notify the affected PJM transmission owner(s) of any \nrequest for NFCD transmission service. Indicated TOs argue that PJM should revise \nsection 713 of PJM's illustrative tariff provisions to require that notice of any curtailment \nbe provided not only to the Eligible Customer but also to the affected PJM transmission \nowner or Electric Distribution Company. \n422.\nConstellation recommends that, for Eligible Customers requesting transmission \nservice on behalf of Co-Located Load, if the customer facilities include an existing \ngenerator, a certification be required that the existing generator supports the transmission \nservice request.909  Constellation argues that this requirement would ensure the \nCo-Located Load is physically connected to the facilities of the existing or planned \nCustomer Facility. Alliance promotes their framework for looking at how to responsibly \nenable large-load integration while preserving reliability, cost causation, and \naffordability.910 \n905 Indicated TOs Response Brief at 18. \n906 Id. at 19, 24. \n907  Id. at 18-19 n.41. \n9°8  Id. at 20-22. \n909 Constellation Response Brief at 30. \n91°  Alliance Response Brief at 2. \n353 of 515"},{"page":63,"startToken":26321,"endToken":26706,"text":"Document AccessigPIr; 2kAqq-18 _3g99urnent:FiA, rpAg9: 835/18/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 197 - \nc. \nReply Briefs  \n423.\nIn response to parties' comments, particularly those of Indicated TOs, PJM \nproposes certain revisions to its illustrative tariff language for FCD and NFCD \ntransmission services.911  Specifically, PJM notes that it proposes revisions to \nsection 711.3 to provide that the applicable transmission owner will be notified of \nmaterial changes to Co-Located Arrangements, as well as a reference to the PJM manuals \nfor further description of what would constitute a material change. PJM further proposes \nchanges to section 713.1 to provide that PJM will notify the applicable transmission \nowners of any instruction to curtail Co-Located Load. \n424.\nConstellation urges the Commission to deny Indicated TO.,; proposal to replace \n\"Delivery Point\" with \"Point of Change in Ownership\" in PJM's requirements for \napplications for FCD and NFCD transmission services because it would risk uncertainty \nor delays for parties in Co-Location Arrangements.912  Constellation asserts that the Tariff \nshould use \"Point of Interconnection,\" consistent with the definition of Co-Located Load. \n425.\nSince filing its initial brief, PJM states that it has determined that changes to \nAuction Revenue Rights rules must be modified to recognize that FCD transmission \nservice customers will contribute towards enhancing and maintaining the transmission \nsystem and should have the right to request Auction Revenue Rights.913  To effectuate \nthis modification, PJM proposes a revision to Operating Agreement, Schedule 1, \nsection 7.4.2(d) and includes a new Operating Agreement, Schedule 1, section 7.4.2(1) to \ndetail the Auction Revenue Rights rules specific to Eligible Customers taking FCD \ntransmission service.914 \nd. \nDetermination \n426. \nWe disagree with PJM that it is just and reasonable for the replacement rate to \nrequire Eligible Customers requesting FCD or NFCD transmission service to provide an \nauthorization or certification from its RERRA affirming that the Eligible Customer is \nauthorized to provide energy to the Co-Located Load.\"' PJM does not provide any \nexplanation or context for proposing this requirement, and it is not clear why an Eligible \n911  PJM Reply Brief at 62-63. \n912  Constellation Reply Brief at 9 (citing Indicated TOs Response Brief at 19). \n913  PJM Reply Brief at 65. \n914  Id. at 65-66. \n915  PJM Initial Brief at 18-19. \n354 of 515"},{"page":64,"startToken":26706,"endToken":27170,"text":"Document AccessigP. \nqq2.4_,18 _3L29cument:Flil d  &qv: A5A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 198 - \nCustomer would need to go through this extra step under the Tariff to prove it is \nauthorized to serve load. If an Eligible Customer that is not authorized to provide energy \nto load attempts to do so, that would be a matter for the RERRA's enforcement \nmechanisms. \n427.\nWe similarly disagree with Constellation that it is necessary to require Eligible \nCustomers requesting FCD or NFCD transmission service on behalf of Co-Located Load \nto include a certification from the Co-Located Generator, if it is an existing generator, to \nensure that the Co-Located Load is physically connected to the generator's facilities. The \nCommission already made clear that Co-Located Load must be \"physically connected to \nthe facilities of an existing or planned Customer Facility on the Interconnection \nCustomer's side of the Point of Interconnection to the PJM Transmission System.\"916  If \nan Eligible Customer attempts to request FCD or NFCD transmission service on behalf of \na load that did not meet the definition of Co-Located Load, that should be referred to the \nCommission's Office of Enforcement and Regulatory Accounting. \n428.\nIndustrials/Amtrak argue that Co-Located Load on whose behalf an Eligible \nCustomer takes NFCD transmission service should have firm natural gas capacity or \nother adequate alternatives to be able to utilize the service.917  Industrials/Amtrak explain \nthat such a requirement would \"avoid misuse of the [NFCD transmission] service by \ngenerators who have the ability to operate but may want to rely on the grid when it \nappears to be more economical for that generator.\" The December Order contained no \nsuch limitation and Industrials/Amtrak have failed to justify adding it here. Specifically, \nthe December Order stated that NFCD transmission service would reflect Eligible \nCustomers taking service on behalf of Co-Located Loads that may not \"necessarily plan \nto withdraw energy from the transmission system on a regular basis\" but \"still seek to \nwithdraw energy from the transmission system from time to time when transmission \ncapacity is available and not needed by firm customers.\"918  The December Order thus \ncontemplates that NFCD transmission service would be an option for Eligible Customers \ntaking transmission service on behalf of Co-Located Load, not a mandate. \n429.\nIndicated TOs request that the Commission direct as part of the replacement rate \nrequirements related to Eligible Customers satisfying requirements related to load \ninterconnections.919  Indicated TOs have not explained why these requirements are \n916  December Order, 193 FERC 1161,217 at P 1 & n.3; February Order, 190 FERC \nIT 61,115 at P3 & n.4. \n917  Industrials/Amtrak Response Brief at 24. \n918  December Order, 193 FERC ¶ 61,217 at P 214. \n919  Indicated TOs Response Brief at 18-19. \n355 of 515"},{"page":65,"startToken":27170,"endToken":27579,"text":"Document A.c.„sigP#:: \nLPAW: °A812 pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 199 - \nnecessary, and so we decline to make them a part of the replacement rate at this time. \nHowever, we agree with Indicated TOs' request that PJM add a placeholder section for \nlisting necessary control technologies and/or protection systems to section 5.0 of PJM's \nproposed Attachment F-4. \n430.\nWe also find PJM's proposal to allow FCD transmission service customers to \nrequest Auction Revenue Rights in stage 2 of the allocation process to be just and \nreasonable. Given the underlying design of the FCD transmission service, we find the \npresumption that FCD transmission service customers contribute towards enhancing and \nmaintaining the transmission system on par with other Firm PTPS transmission \ncustomers to be reasonable. PJM's proposal provides FCD transmission service \ncustomers an equivalent opportunity to request Auction Revenue Rights. We direct PJM \nto submit a compliance filing within 60 days of the date of issuance of this order to revise \nits Tariff consistent with this replacement rate. Consistent with our determination above \nto extend the three new transmission services set forth in the December Order to Eligible \nCustomers taking service on behalf of load with BTMG that are willing and able to limit \ntheir energy withdrawals from the transmission system under certain conditions, we \nfurther direct PJM to reflect this change in its compliance filing. \nB. \nAdditional Charge for Eligible Customers Taking FCD and/or NFCD \nTransmission Service  \n1. \nDecember Order \n431.\nAs part of the paper hearing, the Commission asked the parties: \nShould the rate paid by an Eligible Customer on behalf of a \nCo-Located Load taking only the new Non-Firm Contract \nDemand transmission service that elects to not reserve any \namount of that service for a period of time (e.g., one month) \nreflect not only charges for regulation and black start \nservices, but also an additional charge given that regulation \nand black start services could not be provided without the \ntransmission system? If so, how should that additional charge \nbe determined? \n432.\nIn addition, the Commission asked: \nShould the rate paid by an Eligible Customer on behalf of a \nCo-Located Load taking only a de minimis amount of the new \nFirm or Non-Firm Contract Demand transmission services \nreflect not only (i) charges for regulation and black start \nservice and (ii) the transmission service charges for that \nde minimis amount of service, but also an additional charge \n356 of 515"},{"page":66,"startToken":27579,"endToken":28000,"text":"Document AccessigPV; -2521q4518-31:2E6ument:Flild rpa'qg.e: A5A8/2pate Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 200 - \nreflecting that the Co-Location Arrangement is physically \nconnected and synchronized to the PJM transmission system? \nIf so, how should that additional charge be determined? \n2. \nInitial Briefs  \n433.\nIndicated TOs propose to charge a Grid Reliance Charge to Eligible Customers \ntaking FCD or NFCD transmission service based on the difference between either the \ncontract amount of FCD transmission service, or the reserved amount of NFCD \ntransmission service, and the customer's gross on-site load.920  Indicated TOs explain that \nthe Grid Reliance Charge is designed to reflect the costs of using the transmission system \nto deliver black start and regulation services, as well as the inherent benefit that all \ncustomers receive through their synchronization to and reliance on the transmission \nsystem. Indicated TOs state that the Grid Reliance Charge also recognizes the costs \nassociated with the operations, maintenance, and other activities that Indicated TOs will \nneed to perform for the transmission system and to accommodate the increased number \nof protection schemes required for Co-Location Arrangements. Indicated TOs propose to \ncalculate this charge for each zone based on an average fixed percentage of the portion of \ntransmission depreciation and operations and maintenance expense associated with \nproviding grid reliance services, and to apply that percentage to each transmission \nowner's annual revenue requirement.921  Indicated TOs argue that it is appropriate to use \nannual depreciation and operations and maintenance expenses because these expenses \nbest capture the portions of a transmission owner's revenue requirement relating to the \nongoing reliable operation of the transmission system. Indicated TOs propose an initial \npercentage of 25.8%, subject to adjustment every five years. \n434.\nIn further justifying the Grid Reliance Charge, Indicated TOs assert that \nCo-Located Load and its associated Co-Located Generator benefit from the existence and \nreliable operation of the transmission system because they are electrically connected to \nthe transmission system, and should contribute to paying the costs of continuing to \nreliably operate the system regardless of the amount of energy withdrawn. Indicated TOs \ncontend that a large Co-Location Arrangement with zero MW of FCD or NFCD \ntransmission service still depends on the grid for the delivery of various ancillary services \nand a suite of synchronization support services, such as stable frequency, inertia, stability \nservices, fault current capability, and ride-through and protection coordination. Indicated \nTOs argue that the Commission has long recognized that an integrated transmission \n920  Indicated TOs Initial Brief at 14. \n921  Id. at 14-16. \n357 of 515"},{"page":67,"startToken":28000,"endToken":28438,"text":"Docufnelit AccessigPV: 2.2q-Argbq-1 8 _3P9cUrnerlt:Flild rpAp: A5/48/2 p-Ate Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 201 - \nsystem provides broad reliability benefits to all customers of the system, and this \nrecognition has guided Commission decisions on ratemaking and cost allocation.922 \n435.\nIndicated TOs maintain that their proposed methodology for the Grid Reliance \nCharge is a just and reasonable way to estimate with an appropriate level of precision the \nbenefits to Co-Located Load from relying on the grid while ensuring this charge can be \nfairly and efficiently implemented.923  Indicated TOs state that they have included \ndetailed testimony on the proposed methodology, and they highlight that the allocator is \nbased on costs included in transmission plant and transmission operations and \nmaintenance FERC accounts.924  Indicated TOs contend that their proposal is \nconservative in a number of respects, for example, they exclude amortization and general \nplant depreciation, as well as administrative and general expenses. Indicated TOs explain \nthat the allocator will be multiplied by each transmission owner's rate for NITS and FCD \ntransmission service, resulting in an \"unadjusted\" Grid Reliance Charge rate. Indicated \nTOs further explain that they propose to multiply this unadjusted rate by a ratio that \naccounts for the difference between the demand used to account for the NITS and FCD \ntransmission service rate and the gross load for Eligible Customers on behalf of \nCo-Located Load, resulting in the final Grid Reliance Charge for each zone. Indicated \nTOs propose to update the allocation percentage every five years to ensure rate stability \nand avoid the allocators becoming stale. Indicated TOs propose to apply the revenues \nfrom the Grid Reliance Charge as credits to NITS and FCD transmission service \ncustomers in the relevant zone to avoid double recovery or inappropriate cost shifts. \n3. \nResponse Briefs \na. \nBasis for an Additional Charge \n436.\nODEC and NOVEC support Indicated TOs' proposal for a Grid Reliance Charge \nto be applied to customers taking FCD and NFCD transmission service.925  ODEC argues \nsuch a charge ensures that Co-Located Loads pay their \"fair share\" of costs that are \ncommensurate with the benefits Co-Located Loads receive from the transmission system, \nincluding the costs associated with delivery of black start and regulation services. \nNOVEC similarly asserts that Co-Located Load depends on the transmission system to \ndeliver black start and regulation services, the charges for which a delivery component is \n922  Id at 15-16 (citing W. Mass. Elec. Co. v. FERC, 165 F.3d 922, 927 (D.C. Cir. \n1999)). \n923  Id at 16. \n924  Id. at 16-18. \n925  ODEC Response Brief at 10; NOVEC Response Brief at 9. \n358 of 515"},{"page":68,"startToken":28438,"endToken":28867,"text":"Document Accessig@A 2A-2.36 18 _3Q9cument:Fl il d  Ipp: \n8, 2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 202 - \nnot included. NOVEC argues that without the Grid Reliance Charge, a Co-Located Load \nthat reserved no FCD or NFCD transmission service would be a free rider, as it would \nbenefit from the payments of existing transmission customers to maintain the \ntransmission system without making any contribution towards it. \n437.\nGeronimo Power argues that Indicated TOs have not demonstrated that their \nproposed Grid Reliance Charge reflects Co-Located Loads' actual impact on or benefits \nfrom interconnection with the transmission system and is consistent with cost causation \nprinciples.926  Further, Geronimo Power states that Indicated TOs have failed to \ndemonstrate that there is a separate delivery component to black start and regulation \nservices and that, if there were such a component, Indicated TOs have not explained why \nit would not be unduly discriminatory to apply it only to Co-Located Loads. \n438.\nVistra argues that Indicated TOs fail to address the nuances in the Commission's \npaper hearing questions on additional charges or the actual ways that NFCD transmission \nservice customers might rely on the grid.927  Vistra asserts that the Commission's \nquestions illustrate that customers could use NFCD transmission service in different ways \nbut transmission owners would impose the same charge regardless. Vistra maintains that, \nwhile Indicated TOs argue that Co-Located Loads are all synchronized to the grid, \nsynchronization is not, itself, a service. Vistra alleges that, in contrast to the \nCommission's long-standing policy that transmission providers offer and price ancillary \nservices separately, Indicated TOs create a new service for what appears to be an \nundefined ancillary service (i.e., grid reliance) to cover a suite of synchronization support \nservices. Vistra argues that it is not consistent with cost causation principles to impose \nthe same grid reliance charge for very different types of grid reliance. Vistra contends \nthat the Commission did not prejudge whether or when a grid reliance charge is necessary \nand that the Commission could conclude no such charge is necessary for customers \ntaking zero MWs or a de minimis amount of the new transmission services. \n439.\nIndustrials/Amtrak argue that, as an as-available service, there should be no \nstandby fee charging NFCD transmission service customers for access to the transmission \nsystem that is not guaranteed. Instead, Industrials/Amtrak contend that customers should \nbe charged based on actual use on an hourly basis.928 \n926 Geronimo Power Response Brief at 10-11, 13-14. \n927  Vistra Response Brief at 19-21. \n928  Industrials/Amtrak Response Brief at 24. \n359 of 515"},{"page":69,"startToken":28867,"endToken":29274,"text":"Document A„e6sigiPg 2q-Agg11.8-3g9cUMent:Filtd rPA99: A6A8/2PAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 203 - \nb. \nMethodology for Determining Additional Charge  \n440.\nNOVEC states that the proposed Grid Reliance Charge is just and reasonable \nbecause it is limited to depreciation and operations and maintenance, and conservatively \nexcludes a return on rate base and associated income taxes.929  NOVEC also notes that \nbecause revenues earned from the Grid Reliance Charge are returned to NITS and FCD \ntransmission service customers as a revenue credit, the structure avoids any risk of double \nrecovery. \n441.\nAlliance argues that the additional charge question is important and should be \nresolved in a way that protects other customers from unjustified cost shifts.93°  Alliance \ntakes no position on a specific dollar figure; instead, it recommends that any additional \ncharge reflect the contributions of load that have efficient operations or verified load \nflexibility through reductions in their cost obligations. \n442.\nRegarding Indicated TOs' argument that the Grid Reliance Charge will also cover \ncosts associated with the protection schemes for Co-Located Load, Geronimo Power \nargues there is no reason to believe transmission owners will bear any such costs that \ncould not be addressed in interconnection agreements.93' \n443.\nVistra argues that, even if some charge is appropriate, Indicated TOs have not \njustified their proposed rate.932  Vistra contends that it is unreasonable to propose that a \ncustomer that never takes transmission service receives benefits approximating 25.8% of \nthe transmission owners' revenue requirement. Vistra highlights that only 0.5% of PJM's \nmonthly total billings are related to black start and regulation charges and that, to the \nextent an NFCD transmission service customer never reserves transmission service relies \non the transmission system, that reliance is for the sole purpose of receiving black start \nand regulation service. As such, Vistra argues, the percentage of PJM's total monthly \nbillings that relates to black start and regulation charges is a reasonable proxy for the \namount of transmission system costs that are associated with use of the grid to deliver \nblack start and regulation service. \n444.\nVistra also contends that Indicated TOs' proposal conflicts with the Commission's \ntransmission pricing policy because it disincentivizes efficiency and focuses on \nreallocating a large share of sunk costs. Moreover, Vistra contends, Indicated TOs' \n929  NOVEC Response Brief at 10. \n930 Alliance Response Brief at 4. \n931  Geronimo Power Response Brief at 14. \n932  Vistra Response Brief at 21-23. \n360 of 515"},{"page":70,"startToken":29274,"endToken":29686,"text":"Document AccessigSg 'Q''Aq418-34@cument:Flild rpa'gg:A6/1812pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 204 - \nproposal would create significant and unjustified cost shifts between NFCD transmission \nservice customers and Network Customers.\"' Vistra suggests it is not clear what \ntransmission owners, which are major Network Customers, will do with the bill credits \nand that it is not a foregone conclusion that they will pass savings onto retail customers. \n445.\nConstellation contends that Indicated TOs' proposed Grid Reliance Charge rests \non an unsound methodology that violates cost causation principles.934  Constellation \nrequests that the charge be recalculated based on the \"minimum system\" method. \nConstellation asserts that Indicated TOs both exclude reasonable costs and include \nunreasonable costs in the grid reliance capability operations and maintenance and provide \nvery little justification for their proposal. Moreover, Constellation argues that Indicated \nTOs inappropriately include full depreciation costs for a variety of transmission \ncomponents that are sized to meet actual peak demand requirements of the PJM system, \neven though customers paying the Grid Reliance Charge do not withdraw energy from \nthe PJM system. In support of the minimum system method, Constellation argues it is \ndesigned to calculate the set of costs that a Co-Located Load that benefits from the \nexistence of wires but imposes no demand on the grid should share. Constellation \nexplains that its method involves determining the minimum size of all electricity system \ncomponents that could be used by the utility to recreate its system and connect each \ncustomer to the grid, and then applying this fraction to each transmission owners' NITS \nrate. \n4. \nReply Briefs  \na. \nBasis for an Additional Charge \n446.\nIndicated TOs contend that being connected to the grid provides obvious benefits \nin terms of the ability to access resources that are not co-located with load.935  Indicated \nTOs further argue that being connected to the grid includes benefits like delivering \nancillary services and essential reliability services, such as frequency support, inertia, \nvoltage stability, fault current capability, ride-through and protections coordination, and \nproviding sufficient short-circuit capability. Indicated TOs state that they are unaware of \nany existing or proposed Co-Located Load customers that are choosing to island their \nload and on-site generation, and they infer from that fact that Co-Located Loads should \n933  Id. at 23-25. \n934  Constellation Response Brief at 25-28. \n935  Indicated TOs Reply Brief at 22 (citing Joint Blazunas/Schafer/Hammer \nRebuttal Test. at 16); see also Joint Blazunas/Schafer/Hammer Rebuttal Test. at 31. \n361 of 515"},{"page":71,"startToken":29686,"endToken":30052,"text":"Document A„essigPSA: qc1\"2-%Qq1 8 -.349 urnent:Flita rEN9:4,48/2 pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 205 - \nshare in the basic costs of operating and maintaining the grid upon which they rely.936 \nIndicated TOs further argue that an additional charge is appropriate because ancillary \nservices such as black start and regulation provide no value without the ability to access \nthe transmission system to obtain them.937 \nb. \nMethodology for Determining Additional Charge  \n447.\nIndicated TOs defend their proposed methodology, arguing that it produces a more \nconservative result focused on recovery of the costs necessary to support the ongoing \nreliable operation of the transmission system, rather than a return on investment.938 \nIndicated TOs criticize Constellation's proposal to use the \"minimum system\" method, \narguing that it is not used at the transmission level and lacks any correlation between the \nbenefits Co-Located Load receives and the electrical connection of customers. Indicated \nTOs also reject Vistra's proposed methodology, arguing that Vistra draws no connection \nbetween the percentage of billed revenue for regulation and black start and the costs of \nthe transmission system to deliver those services and the benefits associated with grid \nconnection. \n448.\nNOVEC argues that Constellation's minimum system proposal is not cost-aligned \nwith the use of black start service or regulation service because black start service relies \non the existence and durability of the transmission system in a way that Constellation's \nminimum system methodology does not capture.939  NOVEC further argues that the ratio \nmethod advanced by Vistra arbitrarily confuses the cost of black start and regulation \nservices with the cost of the transmission infrastructure necessary for customers to \nreceive them. \n449.\nJoint Co-Location Developers argue that the proposed Grid Reliance Charge is \nderived from an unsound methodology that violates cost causation principles.940  Joint \nCo-Location Developers argue that the Commission should direct the PJM transmission \n936  Indicated TOs Reply Brief at 22. \n937  Id. at 22-23. \n938  Id. at 24, 26-27, 29. \n939  NOVEC Reply Brief at 23, 26. \n94°  Joint Co-Location Developers Reply Brief at 3 (citing Constellation Response \nBrief at 25; Geronimo Power Response Brief at 9-15; Vistra Response Brief at 18-23). \n362 of 515"},{"page":72,"startToken":30052,"endToken":30425,"text":"Document AccessigPSg 2A72-YRI. 8 - 3QiNument:Fl it d rfal@g: A6/48/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 206 - \nowners to adopt the alternate cost calculation framework proposed by Constellation, \nwhich follows the Commission's cost causation principles.\"' \n450.\nIndustrials/Amtrak argue that the proposed Grid Reliance Charge fails to reflect \nhow different customers actually rely on the transmission system and would result in \ncustomers that take little or no energy from the grid subsidizing traditional network \ncustomers, violating cost causation principles.942  Industrials/Amtrak argue that NFCD \ntransmission service should not be charged a standby fee such as the Grid Reliance \nCharge, as NFCD transmission service does not provide any guaranteed availability. \n5. \nAnswers  \n451.\nConstellation contends that Indicated TOs' proposal would force customers that do \nnot impose demand on the transmission system to pay for transmission components sized \nto serve peak load, while also arbitrarily excluding costs related to rate of return and \ntaxes.943  Constellation defends its proposed minimum system methodology. \n452.\nGeronimo Power asserts that, while it does not oppose the concept of a grid \nreliance charge, Indicated TOs continue to fail to show that it is necessary and reflects \nCo-Located Loads' actual grid impact or the transmission service they will receive.944 \nGeronimo Power argues that Indicated TOs' proposal to assess a charge for the delivery \nof black start and regulation service when other customers are not required to pay a \nseparate delivery charge is unjust, unreasonable, and unduly discriminatory or \npreferential.945  Geronimo Power maintains that Indicated TOs have not demonstrated \nthat the purported synchronization benefits will accrue to the same degree for Co-Located \nLoad that is being primarily supplied by on-site generation.946 \n453.\nIndicated TOs respond to Constellation's argument that the Indicated TOs' \nproposed charge is based on the cost of the transmission system to serve peak demand \nrather than to delivery ancillary services, arguing that the purpose of the Grid Reliance \n941  Id. at 4 (citing Constellation Response Brief, attach. 1, (Testimony of Zachary \nMing), at 14-15). \n942  Industrials/Amtrak Reply Brief at 11-12, 14. \n943  Constellation May 11 Answer at 11-12. \n944  Geronimo Power May 21 Answer at 10. \n945  Id. at 11. \n946 1d. at 12. \n363 of 515"},{"page":73,"startToken":30425,"endToken":30856,"text":"Document AccessigiSP: 22q-A-,1 8  _3pwument:FlAd rp,Ag9: A6A 8/2  pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 207 - \nCharge is not only to recover costs to deliver ancillary services, but to ensure Co-Located \nLoad customers pay their fair share of the transmission system as it exists and the \nassociated benefits that it provides to all interconnected customers, including essential \nreliability services.94' Indicated TOs maintain that their proposed charge does so by \ncalculating the annual depreciation and operations and maintenance expenses that \nconstitute a reasonable proxy for the costs of providing those benefits. Indicated TOs \nassert that Constellation's minimum system method is only appropriate for and applicable \nto distribution level service. \n6. \nDetermination \n454.\nIn the December Order, the Commission sought briefing on whether the \nCommission should establish an additional charge for Eligible Customers on behalf of a \nCo-Located Load that elects to not reserve any amount of transmission service or only a \nde minimis amount of transmission service.948  In response, parties submitted briefs \naddressing a range of issues, including, among others: (1) what potential benefits \nEligible Customers that are synchronized to the transmission system might receive when \nnot drawing energy from the transmission system; (2) whether those potential benefits \nwarrant an additional charge or are adequately addressed through any transmission \nservice charges that the Eligible Customer is already responsible for; and (3) proposed \nrates for such a charge and whether those proposed rates are consistent with cost \ncausation principles. \n455.\nWe have considered that record and conclude that it does not adequately \nsubstantiate the need for an additional charge at this time or how such a charge should be \ncalculated and assessed. In particular, the record contains insufficient description of the \npotential nature or magnitude of the cited benefits or the potential costs that transmission \nproviders or owners may incur when providing these benefits to Eligible Customers on \nbehalf of Co-Located Loads. For example, Indicated TOs state that, even where an \nEligible Customer has requested FCD or NFCD transmission service for 0 MW, a large \nCo-Location Arrangement will still depend on the transmission system for a suite of \nsynchronization support services, such as stable frequency, inertia, stability services \n(damping, angle stability), fault current capability, and ride-through and protection \ncoordination.9\" However, beyond briefly listing such benefits, the record lacks \nspecificity regarding what these services are, what costs they involve, and how they \n947  Indicated TOs May 28 Answer at 11. \n948  December Order, 193 FERC ¶ 61,217 at P 219, questions 3 and 4. \n949  Indicated TOs Initial Brief at 15. \n364 of 515"},{"page":74,"startToken":30856,"endToken":31266,"text":"Document AccessigPSA:  22Q-2-YRI.8-3QPc ument FlAd \nAK8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 208 - \nbenefit Eligible Customers on behalf of Co-Located Loads. Accordingly, we decline to \nestablish an additional charge at this time. \n456.\nNonetheless, we recognize that the new transmission services created in this \nproceeding could raise novel questions regarding application of cost causation principles, \nparticularly if, in practice, many Eligible Customers taking the new transmission services \non behalf of Eligible Load elect to take a de minimis or not reserve any amount of \ntransmission service. We believe that experience with the actual use of these new \ntransmission services will improve our understanding of any potential issues and inform \nwhether future action is needed. To the extent parties identify such issues resulting from \nhow Eligible Customers on behalf of Eligible Load use the new transmission services, \nthey may submit filings under FPA section 205 or complaints under FPA section 206, as \nappropriate, and the Commission will consider the records before us at that time. \nC. \nInterconnection Requirements and Operational Practices for \nNecessary Control Technologies and/or Protection Systems  \n1. \nInitial Briefs \n457.\nPJM states that NERC has established reliability standard requirements for the \nvarious forms of control technologies that may be relied upon for grid stability to which \nEligible Customers are expected to adhere.95°  PJM explains that the PJM manuals and, as \napplicable, NERC reliability standards will contain the interconnection requirements and \noperational practices needed for necessary control technologies and protection systems to \nmaintain system reliability if a Co-Located Load or Co-Located Generator trips offline. \nPJM asserts that the NERC reliability standards form baseline interconnection \nrequirements and operational practices, and the PJM manuals provide additional details \nand, at times, more stringent standards for remedial action schemes. PJM describes an \nillustrative list of interconnection requirements and operational practices in its brief, \nincluding NERC Reliability Standards PRC-012-2 and PRC-017-1, PJM Manual 3, \nsection 1.8, and PJM Manual 7, section 17.2.951 \n458.\nIndicated TOs do not offer a specific proposal at this time, but they highlight \nconcerns and key elements relating to interconnection, planning, and operational \npractices for the new transmission services.952  Indicated TOs assert that it is novel to use \nmultiple special protection schemes/remedial action schemes to protect the grid from \nlarge amounts of on-site load exceeding their contractual withdrawal limitations. \n95°  PJM Initial Brief at 56-57. \n951  Id. at 57-58. \n952  Indicated TOs Initial Brief at 22-26. \n365 of 515"},{"page":75,"startToken":31266,"endToken":31715,"text":"Document Accessig \nqPiAgg-1.8-348cument:Flild EpAg:A6A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 209 - \nIndicated TOs recommend that all special protection schemes and remedial action \nschemes be fully redundant to protect against the failures of protection schemes. \nIndicated TOs recommend that the Eligible Customer taking FCD transmission service, \nNFCD transmission service, or Interim NITS on behalf of Co-Located Load pay for \nPJM- and transmission owner-administered studies to ensure any special protection \nschemes or remedial action schemes can mitigate the risks of potential failure modes. \nIndicated TOs request the option to review and agree to curtailment procedures and \noperational control mechanisms. Indicated TOs argue that all special protection schemes \nand remedial action schemes must meet PJM and transmission owner technical criteria. \n459.\nIndicated TOs state that the Commission should consider requiring more frequent \ntesting of special protection schemes and remedial action schemes than is currently \nrequired by NERC reliability standards. Indicated TOs argue that they and PJM should \nreceive test results of protection schemes and that any inadequate special protection \nschemes or remedial action schemes should be updated accordingly. Indicated TOs argue \nthat they and PJM should be permitted to implement and enforce reasonable limits on the \ntotal amount of load that can be covered by special protection schemes or remedial action \nschemes. Indicated TOs request that the Commission direct NERC to establish \nrequirements so that Eligible Customers taking FCD transmission service, NFCD \ntransmission service, or Interim NITS on behalf of Co-Located Loads would be \nresponsible for meeting relevant NERC reliability standards. Indicated TOs contend that \nthe Commission must strictly enforce compliance with NERC Reliability Standard \nPRC-012-2 (Remedial Action Schemes), which includes nine requirements to address all \naspects of remedial action schemes. Indicated TOs also emphasize that they will need to \nperform load integration studies for any Co-Located Load, as they currently do for large \nload customers, which could involve analysis of whether upgrades are needed to \naccommodate the physical gross load behind the Point of Interconnection. \n2. \nResponse Briefs  \n460.\nVistra opposes Indicated TOs' request to implement and enforce limits on the \namount of load that can be covered by special protection schemes, including in certain \nareas.953  Vistra expresses concern that this limit could lead to undue discrimination, and \nargues that if the Commission permits such limits, the Commission must ensure \nstandardized and transparent guidelines are in place. Vistra contends that Indicated TOs' \nproposal would violate the comparability requirement because PJM's existing procedures \ndo not include location-based restrictions for remedial action schemes. Vistra also \nopposes Indicated TOs' proposal to own special protection schemes, arguing that it \nwould needlessly raise the cost of transmission service. \n953  Vistra Response Brief at 27-28, 31. \n366 of 515"},{"page":76,"startToken":31715,"endToken":32095,"text":"Document AccessigPSK 2A-AA18 -31?Pcument:FlA d  rpAgp:A6A8/2p,,aje Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 210 - \n461.\nNOVEC states that at a minimum, PJM's proposal to incorporate NERC reliability \nstandards is just and reasonable.954  NOVEC also states that the Commission should \ndirect NERC to establish registration requirements for Co-Located Loads so that they can \nbe responsible for meeting NERC reliability standards. \n462.\nNOVEC states that special protection schemes should be fully redundant and that \nthe applicable transmission owner should be able to establish technical criteria for the \ninterconnection of Co-Located Load.955  NOVEC argues that transmission owners are \nfamiliar with the operating characteristics of their own systems, and any criteria should \nbe flexible enough to include reasonable requirements the transmission owners believe \nare necessary to protect the transmission system. \n463.\nIndustrials/Amtrak argue that, to the extent that special protective schemes are \nrequired by the Commission for access to NFCD transmission service, the requirements \nshould account for realistic on-site constraints, such as certain load/generation \nconfigurations that allow only a limited amount of draw from the transmission system.956 \n464.\nIn response to PJM's Initial Brief, Indicated TOs argue that any Eligible Customer \ntaking any of the new transmission services (including FCD transmission service) ought \nto comply with requirements to implement necessary control technologies and protection \nsystems to ensure that a Co-Located Load does not exceed its specified level of \nservice.957  Indicated TOs therefore request that PJM add language to section 708(c) of \nPJM's illustrative tariff provisions making clear that Interim NITS, FCD transmission \nservice, and NFCD transmission service are contingent on the implementation of \nnecessary control technologies and protection systems, where applicable. Relatedly, \nIndicated TOs propose to strike the phrase \"only in the case of Non-Firm Contract \nDemand Transmission Service\" from subclause (ii) of section 710.5 of PJM's illustrative \ntariff provisions.958  Similarly, Indicated TOs contend that PJM should revise \nsection 713.6 of PJM's illustrative tariff provisions so as to not limit the requirement to \nestablish necessary control technologies and protection systems to NFCD transmission \nservice. \n954  NOVEC Response Brief at 16-17. \n955  Id. at 17. \n956  Industrials/Amtrak Response Brief at 25. \n957  Indicated TOs Response Brief at 7-8, 17-18. \n958  Id. at 19-20, 22. \n367 of 515"},{"page":77,"startToken":32095,"endToken":32484,"text":"Document Accessigi?:  qq\"23oql 8 - 3ggcLIMent:FlAd LPag9:A6A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 211 - \n465.\nIndicated TOs argue that PJM should include language in the Tariff making clear \nthat necessary control technologies and protection systems may be required on both the \ncustomer's and the transmission owner's side of the Point of Interconnection, including \nin section 710.5 of PJM's illustrative tariff provisions.959 \n466.\nIndicated TOs argue that it is important for PJM to work with the PJM \ntransmission owners and other stakeholders to develop details on the requirements \nassociated with control technologies and protection systems necessary to ensure that \nCo-Located Loads do not exceed their relevant withdrawal limitations.96° \n467.\nConstellation seeks clarification that PJM only intends to apply existing \nrequirements in Manual 3 to Co-Location Arrangements, not to establish new \nrequirements solely for such arrangements.961  Constellation also seeks clarification that \nPJM does not intend to restrict the use of permanent system protection schemes. \n468.\nConstellation supports Indicated TOs' first four recommendations, subject to \nclarification to avoid delay and discrimination.962  For example, while Constellation \nsupports requiring full redundancy for special protection schemes and remedial action \nschemes, Constellation argues that it is not clear what full redundancy means. \nConstellation opposes the Indicated TOs' remaining recommendations as unsupported \nand discriminatory. \n3. \nReply Briefs  \n469.\nIndicated TOs state that they agree that the transmission owner and customer each \nmay own the circuit breaker(s) and protection systems at their respective facilities and, in \nresponse to Constellation, state that the number of breakers will be determined by the \ntransmission owner's and customer's design practices and budgets, as well as the \n959  Id. at 8-9, 20. \n96°  Id at 9. \n961  Constellation Response Brief at 21. \n962  Id. at 22-25. More specifically, Constellation supports, subject to clarification, \nIndicated TOs' recommendations that: (1) all special protection schemes and remedial \naction schemes be fully redundant; (2) customers should pay for PJM and transmission \nowner-administered studies to ensure any special protection schemes and remedial action \nschemes can effectively mitigate the risks of potential failure modes; (3) transmission \nowners have the option to review and agree to any customer load curtailment procedures \nor operational control mechanisms; and (4) all special protection schemes and remedial \naction schemes must fully meet PJM and transmission owner technical criteria. Id. \n368 of 515"},{"page":78,"startToken":32484,"endToken":32823,"text":"Document AccessigPW 2A-Aqq1.8-34Pcument:Flild Ifaiqp:A6)21.8/2pate Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 212 - \ntransmission owner's technical criteria. Indicated TOs disagree with Constellation's \nassertion that new technical criteria specific to Co-Located Load need not be added to \nPJM Manual 3. Indicated TOs argue that such revisions or additions may be unavoidable \ndue to the technical characteristics of Co-Located Load and contend that PJM and the \nPJM transmission owners should not be restricted from developing and implementing \ncriteria applicable to Co-Located Load as a class if warranted by reasonable technical \ndifferences.963 \n470.\nIndicated TOs argue that Constellation's request for the Commission to reject \ncertain recommendations made by Indicated TOs is without merit. Indicated TOs reject \nConstellation's claim that these recommendations treat Co-Located Loads differently \nwithout legitimate basis and explain that certain transmission owners already require \nprotection on their facilities in certain circumstances.964 \n471.\nIndicated TOs argue that Vistra provides no convincing reason for the \nCommission to reject Indicated TOs' recommendation for reasonable limits on the \namount of load covered by special protection schemes/remedial action schemes in \nspecific geographic areas. Indicated TOs acknowledge, however, that implementing such \nlimitations would require the development of further details and guidelines.965 \n472.\nJoint Co-Location Developers argue that PJM and Market Monitor ignore the \ndistinction between simple withdrawal-limiting protection systems that are required by \nPJM for sites taking non-firm transmission service and standard remedial action \nschemes.966  Joint Co-Location Developers explain that unlike standard remedial action \nschemes, which monitor and control components across the grid, simple \nwithdrawal-limiting protection systems monitor and control only facility-internal \ncomponents, monitoring flows, adjusting consumption or generation at the site level, and \ndisconnecting from the grid if necessary. Joint Co-Location Developers argue that \nsimple withdrawal-limiting protection systems can be relied upon much more extensively \nthan standard remedial action schemes without creating the same complexities and \ninterdependencies. \n963  Indicated TOs Reply Brief at 11-13. \n964  Id. at 13-14. \n965  Id at 14. \n966  Joint Co-Location Developers Reply Brief at 6-7. \n369 of 515"},{"page":79,"startToken":32823,"endToken":33171,"text":"Document AccessigPir; Z2-%q1q71 - 312€6ument:FlAd rpAg:A7/ 812 pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 213 - \n473.\nJoint Co-Location Developers agree with Indicated TOs that all special protection \nschemes and remedial action schemes should be fully redundant.967 \n474.\nConstellation argues that Indicated TOs' recommendation that PJM impose \nnecessary control technologies and protection systems on both the customer's side and \nthe transmission owner's side of the Point of Interconnection for Co-Located Loads as a \ndefault requirement is unsupported and unduly discriminatory.968  Constellation asserts \nthat always requiring double special protection schemes is not good utility practice and \nwould likely be appropriate only in rare situations.969 \n475.\nConstellation contends that system studies of unauthorized use should be \nstandardized, transparent, and based on reasonable assumptions set ahead of time to avoid \ndisparate treatment.97°  Constellation states that PJM can use the standardized study \nprocesses and established reliability tests in its existing generator interconnection process \nand RTEP process to determine whether a special protection scheme is needed. \n476.\nConstellation argues that criteria for special protection schemes should leverage \ncurrent RTEP planning criteria to develop specific criteria for Co-Located Load risks that \nare reasonable and transparent.97I \n477.\nConstellation asserts that the special protection scheme that PJM requires an \nEligible Customer to implement should be commensurate with the risks identified in the \nstudies. Constellation argues that special protection schemes are not appropriate for \nevery situation, and PJM only requires them when studies identify actual overloads and \nconditions that could cause cascading failures that PJM cannot mitigate through normal \noperations.972  Constellation contends that double special protection schemes should not \nbe employed when other measures can maintain system reliability and real-time \nmonitoring can address any unexpected reliability issue.973 \n967  Id. at 7 n.23 (citing Indicated TOs Initial Brief at 23). \n968  Constellation Reply Brief at 13-14 (citing Indicated TOs Response Brief at 8). \n969  Id at 14 (citing Kormos Aff. ¶¶ 7, 11). \n97°  Id at 15. \n971  Id at 15-16. \n972  Id at 16 (citing Kormos Aff. ¶¶ 5-6). \n973  Id at 18. \n370 of 515"},{"page":80,"startToken":33171,"endToken":33555,"text":"Document Accessig@A 2qXR18-399cument:Flild IFAgp: A7A8/ - pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 214 - \n4. \nAnswer \n478. In response to Constellation, Indicated TOs argue that, in order for an Eligible \nCustomer to take one of the new transmission services, it is necessary and just and \nreasonable to require an Eligible Customer to include appropriate protection systems.974 \nIndicated TOs further assert that special protection schemes on the Co-Located Load \ncustomer's and the transmission owner's side of the point of interconnection should not \nbe limited to what Constellation claims are higher-risk situations.975  Indicated TOs claim \nthat, without protection system redundancy, the transmission system is at risk.976 \nIndicated TOs reject Constellation's assertion that PJM should use a PJM-driven study \nprocess to evaluate special protection schemes, arguing that special protection schemes \nand remedial action schemes are within the purview of the transmission owners, and PJM \nis not equipped to perform these studies. Indicated TOs also allege that the cost to \nimplement protection systems is extremely low compared to other costs to develop and \ninterconnect Co-Located Load and would not be a deterrent.977 \n5. \nDetermination \n479. \nWe decline to direct PJM's proposal as part of the replacement rate because it does \nnot require Eligible Customers taking FCD transmission service to have necessary \ncontrol technologies and/or protection systems to limit their energy withdrawals from the \ntransmission system to their contract demand level. We find that PJM's proposal is \ninconsistent with the directives in the December Order. In the December Order, the \nCommission found that an Eligible Customer that is willing and able to limit its energy \nwithdrawals from the transmission system under certain conditions should be able to take \ntransmission services on behalf of Co-Located Load that reflect their ability to limit \nwithdrawals.978  The Commission stated that where a Co-Location Arrangement includes \nspecial protection schemes that limit its energy withdrawals, it is a just and reasonable \nreplacement rate to allow an Eligible Customer taking transmission service on behalf of \nsuch load to take these transmission services.979  We clarify, however, that the December \n974  Indicated TOs May 28 Answer at 4. \n975  Id. at 5. \n976  Id at 6. \n977  Id. at 7. \n978  December Order, 193 FERC ¶ 61,217 at PP 159-160. \n979  Id. PP 204-205. \n371 of 515"},{"page":81,"startToken":33555,"endToken":34028,"text":"Document AccessiggSg \n44-20Eg18-3P9c ument:Fl il d \nA7;?38/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 215 - \nOrder did not limit eligibility to take the new transmission services only to Co-Location \nArrangements that include a special protection scheme.98° \n480.\nBased on the record here, we find it just and reasonable that, in order for an \nEligible Customer to take Interim NITS, FCD, and/or NFCD transmission services on \nbehalf of any Eligible Load, an Eligible Customer must have necessary control \ntechnologies and/or protection systems, which may include a special protection scheme, \nto limit its energy withdrawals to its contract demand leve1.981  This replacement rate is \nconsistent with prior Commission precedent for interconnection service, which \nrecognizes that these necessary control technologies and/or protection systems are \nessential to enforce physical limits and ensure system reliability where an Interconnection \nCustomer has requested a level of service below its maximum capacity.982  Further, \nconsistent with the Commission's determination in Order No. 845, nothing prevents an \nEligible Customer taking Interim NITS, FCD, and/or NFCD transmission service on \nbehalf of Eligible Load from proposing its own necessary control technologies and/or \nprotection systems for consideration, which may include a special protection scheme.983 \n481.\nPJM's proposal falls short because it does not require Eligible Customers taking \nFCD transmission service to have necessary control technologies and/or protection \nsystems to limit their energy withdrawals from the transmission system to their contract \ndemand level. As such, PJM would have to rely on penalties that disqualify an Eligible \nCustomer from taking FCD transmission service if the Eligible Customer fails to follow \nestablished load shedding and curtailment procedures, and financial penalties for \nunreserved use of the PJM transmission system, to discourage excess energy \nwithdrawals. However, load shedding and curtailment events for a transmission service \nthat will be treated as the equivalent of NITS for purposes of curtailment will be rare; and \nPJM itself has stated concerns that financial penalties alone are insufficient to deter \n980  Id. P 205 (\"For these reasons, in these instances where the Co-Location \nArrangement includes special protection schemes that limit its energy withdrawals, we \nfind that it is a just and reasonable replacement rate to allow an Eligible Customer taking \ntransmission service on behalf of such load to take and be charged for new types of \ntransmission service that are alternatives, and not equivalent, to NITS.\"). \n981  While we will continue to use the term \"special protection scheme\" in this \nproceeding, we reiterate that this term is equivalent to \"remedial action scheme.\" Id \nP 204. \n982  Reform of Generator Interconnection Procs. & Agreements, Order No. 845, \n163 FERC ¶ 61,043, at P 367 (2018), order on reh'g, Order No. 845-A, 166 FERC \n¶ 61,137, order on reh'g, Order No. 845-B, 168 FERC ¶ 61,092 (2019). \n983  Id P 372. \n372 of 515"},{"page":82,"startToken":34028,"endToken":34524,"text":"Document Accessigi \n2A-Ag18-349cument:lild  L'qp:A57/48/2DAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 216 - \nunreserved use.984  Accordingly, and consistent with our determination above to extend \nthe three new transmission services set forth in the December Order to Eligible \nCustomers taking service on behalf of load with BTMG that are willing and able to limit \ntheir energy withdrawals from the transmission system under certain conditions, we \ndirect PJM to file, within 60 days of the date of issuance of this order, a compliance filing \nwith Tariff revisions that require Eligible Customers taking Interim NITS, FCD, and/or \nNFCD transmission service on behalf of Eligible Loads, to have necessary control \ntechnologies and/or protection systems. \n482.\nWe find it just and reasonable for PJM to include the interconnection requirements \nand operational practices needed for necessary control technologies and/or protection \nsystems in the PJM manuals and, as applicable, to rely on relevant NERC reliability \nstandards, consistent with PJM's current practices. Further, we find it appropriate for \nPJM to develop new interconnection requirements and operational practices that \nrecognize the unique nature of Co-Location Arrangements and the new transmission \nservices. However, PJM has not, to date, actually proposed any interconnection \nrequirements and operational practices specific to Co-Location Arrangements, nor does \nPJM indicate which of its existing interconnection requirements and operational practices \nit will apply to Co-Location Arrangements. Consistent with our determination above to \nextend the three new transmission services set forth in the December Order to Eligible \nCustomers taking service on behalf of load with BTMG that are willing and able to limit \ntheir energy withdrawals from the transmission system under certain conditions, we \ndirect PJM to submit, as part of its compliance filing due within 60 days of the date of \nissuance of this order, an explanation of what new and existing interconnection \nrequirements and operational practices it will apply to Eligible Customers taking Interim \nNITS, FCD, and/or NFCD transmission services on behalf of Eligible Load. We agree \nwith Indicated TOs that it is important for PJM to work with the transmission owners to \ndevelop specificity regarding the requirements associated with necessary control \ntechnologies and/or protection systems necessary to ensure that Eligible Customers do \nnot withdraw energy from the transmission system in excess of their contract demand. \n483.\nWe do not agree that all parties' recommendations to clarify PJM's proposal are \njust and reasonable, or even within the scope of this proceeding. However, we agree that \nsome guidance on the study and implementation of necessary control technologies and/or \nprotection systems would be of value. Therefore, and consistent with our determination \nabove to extend the three new transmission services set forth in the December Order to \nEligible Customers taking service on behalf of load with BTMG that are willing and able \nto limit their energy withdrawals from the transmission system under certain conditions, \nwe explain several principles that PJM's compliance filing should consider. \n984  PJM Initial Brief at 50. \n373 of 515"},{"page":83,"startToken":34524,"endToken":34993,"text":"Document Accessiggsp: A-AQ2-,18 _3cpcument:FlAd ripa g9: (3-JA8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 217 - \n484.\nFirst, Eligible Customers shall pay for PJM and transmission owner-administered \nstudies to evaluate and design necessary control technologies and/or protection systems, \nconsistent with their responsibilities for the costs of other studies performed as part of the \nevaluation of their transmission service request. However, the scope of these studies \nshould be defined in the Tariff, consistent with the level of detail for other transmission \nservices, as discussed in Part VI.A.3.985  Furthermore, we reiterate our finding above that \nan Eligible Customer taking transmission service on behalf of an Eligible Load may \npropose its own necessary control technologies and/or protection systems for \nconsideration as part of this study, which may include a special protection scheme, \nalthough PJM and the transmission owners retain their existing discretion regarding the \ndetermination of what is necessary to ensure the reliability of the transmission system. \n485.\nSecond, if a special protection scheme is employed as necessary control \ntechnologies and/or protection systems, then such special protection schemes \nimplemented must be, at minimum, fully redundant. Given questions by commenters \nregarding what \"redundant\" specifically means, we clarify that such special protection \nschemes must be able to withstand removal of part or all of one scheme due to a failure, \nor to allow for maintenance on a scheme, while providing full scheme capability with a \nfunctionally equivalent and separate scheme.986 \n486.\nThird, all necessary control technologies and/or protection systems, which may \ninclude a special protection scheme, must fully meet PJM and transmission owner \ntechnical criteria, as well as any applicable NERC reliability standards. \n487.\nFourth and finally, both PJM and the transmission owners shall have the option to \nreview and agree to the implementation of the Eligible Customer's necessary control \ntechnologies and/or protection systems as defined in the service agreement, to ensure that \nit meets both PJM and transmission owner technical criteria, and is capable of limiting \nwithdrawals from the transmission system. \n488.\nWe disagree with Indicated TOs that PJM should include language in the Tariff \nmaking clear that necessary control technologies and/or protection systems may be \nrequired on both the Interconnection Customer's and the transmission owner's side of the \nPoint of Interconnection. PJM and the transmission owners will, as noted in the \nprinciples above, be responsible for evaluating and designing necessary control \ntechnologies and/or protection systems for each Co-Location Arrangement. The location \nor number of devices required should be based on the engineering judgment of PJM and \n985  See supra Part VI.A.3. \n986  See, e.g., WECC, Remedial Action Scheme Design Guide, § 4.10 (July 2022), \nhttps://www.wecc.org/sites/default/files/documents/meeting/2024/WECC%20RAS%20D \nesign%20Guide%202022.pdf. \n374 of 515"},{"page":84,"startToken":34993,"endToken":35426,"text":"Document AccessiggSP; 22Q-2-18-3QPcument:Fht d  yalq99:,k7/5is\n Date Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 218 - \nthe transmission owners.987  Similarly, we find that questions of ownership of these \nfacilities, or the potential to earn a rate of return on said facilities, are outside the scope of \nthis proceeding. \n489.\nIn response to Indicated TOs, we find that there is insufficient information in this \nrecord to justify allowing them or PJM to implement and enforce limits on the total \namount of load that can be covered by a special protection scheme. If PJM or its \ntransmission owners wish to impose a specific limit, they may submit a new filing under \nFPA section 205 with a sufficient showing, based on experience gained once Eligible \nCustomers begin taking Interim NITS, FCD, and/or NFCD transmission service on behalf \nof Eligible Load. However, implementation of a special protection scheme should not be \nuniversally required as a condition of taking these transmission services; rather, only \nnecessary control technologies and/or protection systems are required. If PJM or its \ntransmission owners wish to limit the use of special protection schemes on their system, \nthey can also design necessary control technologies and/or protection systems for Eligible \nCustomers that do not have a special protection scheme. \n490.\nWe decline to address NOVEC's request that the Commission direct NERC to \nestablish registration requirements for Co-Located Loads. Whereas NOVEC's request \nmay be availing in the context of a FPA section 215 proceeding, the instant case arises \nunder FPA section 206. In addition, NERC is already considering registration \nrequirements for large loads, including potentially Co-Located Loads, as part of its Large \nLoad Action Plan.988 \nD. \nPenalty Charge or Other Remedial Action for New Transmission \nServices  \n1. \nInitial Briefs \n491.\nPJM proposes different penalties where an Eligible Customer: (1) fails to follow \nestablished load shedding and curtailment procedures; (2) relies on necessary control \n987  Cf. RWE Clean Energy, LLC v. PJM Interconnection, L.L.C., 194 FERC \n¶ 61,212, at P 42 (2026) (\"The Commission generally allows transmission providers to \nexercise their engineering judgment when conducting interconnection studies, including \ndeferring to transmission providers' discretion regarding how to maintain a reliable \ntransmission system.\"); Order No. 1920-A, 189 FERC ¶ 61,126 at P 450 (\"Finally, we \nclarify that the Commission generally provides transmission providers with the discretion \nto use engineering judgment in designing and conducting transmission planning studies, \nand we therefore decline to address Dominion's hypothetical in the abstract.\"). \n988  See NERC, Large Loads Action Plan, https://www.nerc.com/initiatives/large-\nloads-action-plan (last visited May 15, 2026). \n375 of 515"},{"page":85,"startToken":35426,"endToken":35897,"text":"Document Accessigi \n2z -2q:§1.8 - 348c ument:Fl il d 13a.N:A-7/6.8/2Me Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 219 - \ntechnologies or protection systems that fail more than once; and (3) makes unreserved \nuse of the transmission system.989  PJM argues that, where an Eligible Customer fails \nonce to respond to established load shedding and curtailment pfocedures, the customer is \ndisqualified automatically because of the significant reliability risk. PJM asserts that its \nproposal is just and reasonable and consistent with the key principles that (1) Eligible \nCustomers are willing and able to control their withdrawals from the transmission system \nand (2) the services are designed to allow PJM to maintain system reliability. PJM \nproposes that, if the Eligible Customer is taking FCD or NFCD transmission service and \nis disqualified, such customer may still take NITS or Interim NITS. PJM proposes that, if \nthe Eligible Customer is taking Interim NITS and is disqualified, such customer may take \nNITS.99° \n492. PJM argues that when a control technology or protection scheme misoperates \nthere can be serious consequences.991  PJM proposes that, after one instance of \nmisoperation, the Eligible Customer will be prohibited from taking transmission service \nor otherwise withdrawing energy from the transmission system for a period of up to \n120 days from misoperation to allow for an analysis of the necessary control technology \nor protection system scheme's operational performance. PJM asserts that this proposed \npause is consistent with NERC requirements for an investigation into the operation of a \nremedial action scheme992  and will allow PJM time to investigate, identify, and \nimplement fixes to better protect the transmission system.993  PJM proposes that, after \ntwo instances of misoperation, the Eligible Customer will be automatically disqualified \nfrom taking the relevant new transmission service because of the significant reliability \nrisks. PJM asserts that this rule properly balances the need to protect reliability against \nthe desire of an Eligible Customer taking service on behalf of a Co-Located Loads to take \na transmission service lesser than NITS because the Co-Located Loads are willing and \nable to limit their energy withdrawals. PJM maintains that a second instance of a \nmisoperation makes it evident that the necessary control technology or protection system \ncannot adequately protect the system from the Co-Located Load's unreserved energy \nwithdrawals. PJM explains that an Eligible Customer disqualified from taking FCD or \n989  PJM Initial Brief at 40. \n990  Id. at 41-43. \n991  Id. at 43-44. Misoperation, as contemplated by PJM, relies on and incorporates \nthe term as defined by NERC (e.g., PRC-004-6). See, e.g., NERC, PRC-004-6 —\nProtection System Misoperation Identification & Correction (June 12, 2025), \nhttps://www.nerc. c om/gl ob al as s ets/standards/rel iability-standards/prc/prc-0 04-6.p df. \n992  Reliability Standard PRC-004-6. \n993  PJM Initial Brief at 45. \n376 of 515"},{"page":86,"startToken":35897,"endToken":36249,"text":"Document AccessigisA: 2A-2-VA18 - 3RPcument:Flild \nA57A8/2.pe Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 220 - \nNFCD transmission service on this ground may either take NITS or Interim NITS, and \nthat an Eligible Customer disqualified from taking Interim NITS on this ground may take \nNITS. PJM supports its proposal to permit an Eligible Customer disqualified from taking \nthe new transmission services to take NITS by reasoning that NITS, in and of itself, \naddresses curtailment, load shed, and control technology or protection scheme \nmisoperation risk.994 \n493.\nPJM states that it supports a penalty for unreserved use in addition to the \noperational penalties and intends to work with the transmission owners to explore a \nfinancial penalty.995  PJM argues that financial penalties alone are insufficient to \nincentivize Eligible Customers to comply with load shed, curtailment, and control \ntechnology and protection system obligations. PJM asserts that many, if not most, \nEligible Customers taking service on behalf of a Co-Located Load could elect to absorb \nfinancial penalties for unreserved use rather than follow curtailment or load shed \nprocedures or avoid misoperation of the protective technology or system. \n494.\nIndicated TOs assert that any penalty regime should rely on both operational \nconsequences and complementary financial penalties.996  Indicated TOs allege that it is of \nthe utmost importance that Co-Located Loads respect contractual limits because \nCo-Location Arrangements involve substantial amounts of load connected to the grid and \nfailure to respect these limits could pose severe reliability consequences for the system. \n495.\nIndicated TOs support PJM's proposal but argue that additional details must be \ndeveloped as to how operational consequences would be applied.997  Indicated TOs also \nstate that financial penalties could be valuable where the Eligible Customer exceeds its \ncontract demand, even if such deviations are mitigated by a special protection scheme. \n2. \nResponse Briefs  \n496.\nODEC supports PJM's proposed penalty structure, including operational \npenalties.998  NOVEC states that disqualification for failure to follow load shedding or \n994  Id. at 45-50. \n995  Id at 50. \n996  Indicated TOs Initial Brief at 19. \n997  Id at 20. \n998  ODEC Response Brief at 11. \n377 of 515"},{"page":87,"startToken":36249,"endToken":36660,"text":"Documett AccessigPA qq\"2-1§A18-31;26)9LIMent:FlAd LFlaqg \n4/41812 PAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 227 - \n513. Indicated TOs propose to distribute daily, weekly, and monthly penalty revenues \non a monthly basis to Eligible Customers taking NITS or FCD transmission service that \nhave not been penalized during the month, as pro rata bill credits. Indicated TOs further \npropose to distribute annual penalty charges on an annual basis to Eligible Customers \ntaking NITS and FCD transmission service that have not been penalized during the year \nas pro rata bill credits.1025 \n4. \nAnswer \n514. Constellation alleges that PJM's reliability arguments are not persuasive, because \nPJM's example involves grid-connected load, not Co-Located Load.102G  Constellation \nargues that PJM fails to explain how resource adequacy concerns justify its proposed \npenalty scheme, and points out that PJM has proposed no such penalties for Connect and \nManage.1027  Constellation next argues that a four-month suspension is not consistent \nwith NERC requirements, as PJM claims.1028 \n5. \nDetermination \n515. \nWe find that it is just and reasonable to impose operational and financial penalties \non Eligible Customers taking the three new transmission services as part of the \nreplacement rate, given that these services are designed for Eligible Customers taking \ntransmission service on behalf of Eligible Loads that are willing and able to limit their \nwithdrawals from the transmission system under certain conditions, and there are \nsignificant reliability risks if Eligible Customers fail to do so. However, we decline to \nadopt PJM's proposed replacement rate. First, we disagree that it is just and reasonable \nto disqualify an Eligible Customer from taking any of the new transmission services after \nthe first instance of failing to follow a curtailment or load shedding directive, as \ndiscussed below. We instead find that it is just and reasonable to establish an operational \npenalty whereby, after the second instance of failing to follow a curtailment or load \nshedding directive, PJM will terminate the transmission service agreement with the \nEligible Customer taking Interim NITS, FCD, or NFCD transmission service on behalf of \nthe Eligible Load. We agree with PJM that there are significant reliability risks \nassociated with failing to follow a curtailment or load shedding directive, but we find that \nPJM's one strike proposal is unnecessarily strict. We direct PJM to file, within 60 days \n1°25  Id. at 15-16. \n1026  Constellation May 11 Answer at 8-9. \n1°27  Id at 9. \n1°28  Id at 9-10. \n384 of 515"},{"page":88,"startToken":36660,"endToken":37073,"text":"Document Accessigisne; \nArR g--1. 8  _ 31:2@c ument:FlAd rgqg9: \n8.8i2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 221 - \ncurtailment procedures is necessary to protect the integrity of the transmission system.999 \nIndicated TOs request that Tariff language be included requiring that the relevant \ntransmission owner's approval be obtained before service to an Eligible Customer is \nreinstated following a control technology/protection system misoperation. \n497.\nConstellation opposes the proposal to suspend or disqualify an Eligible Customer, \narguing it is excessive and applies regardless of fault and does not apply to Non-Firm \nPTPS customers.'°°° Constellation urges the Commission to follow SPP's proposal for \nConditional High Impact Large Load Service (CHILLS) and align treatment of \n-\nunreserved use for the new services with its treatment of Non-Firm PTPS. DCC \nexpresses concern about PJM's operational penalties in light of the lack of clarity around \nPJM's curtailment procedures for the new transmission services.1°°1  Vistra similarly \nargues that PJM's proposed operational penalties diverge from the Commission's \ndirectives and violate the comparability principle because the December Order does not \ncontemplate disqualification and, more generally, such a penalty structure exceeds what \nthe Commission has allowed for unreserved use of the transmission system.'°°2  Vistra \ncontends that PJM's proposal is excessively punitive and may be unduly discriminatory \nin comparison to customers that take PTPS. Vistra also alleges that PJM's proposal also \nviolates the comparability requirement because it treats Co-Location Arrangements using \nspecial protection schemes differently from any other entities using such schemes. Vistra \nalso points out that, if the Commission accepts transmission owners' proposal to own \nspecial protection schemes, then misoperation of such schemes must attach to the \ntransmission owner, not the Eligible Customer. \n498.\nJoint Co-Location Developers argue that PJM's proposed penalty provisions are \nunjust and unreasonable because they are not \"narrowly designed to balance the need to \ndeter conduct that is harmful to the system with the need to limit excessive and \nunnecessary costs.\"1°°3  Joint Co-Location Developers express concern that PJM's \nproposed disqualification rules will dissuade Eligible Customers from taking the new \ntransmission services because of the risk of stranding or undermining investments in the \n999  NOVEC Response Brief at 11-12. \nnu  Constellation Response Brief at 19-20. See also Joint Co-Location Developers \nResponse Brief at 25. \n1001  DCC Response Brief at 7. \n1002  Vistra Response Brief at 29-31. \n1003 Joint Co-Location Developers Response Brief at 23 (quoting Mirant Kendall, \nLLC, 110 FERC ¶ 61,272, at P 17 (2005)). \n378 of 515"},{"page":89,"startToken":37073,"endToken":37501,"text":"Document A„eseigPV; -qAq,448-31?@cument:Filtd rEq99:AR812pAte Filed: 10116/2026 \nDocket No. EL25-49-002, et al. \n- 222 - \nnew services.1004  Joint Co-Location Developers propose that PJM adopt financial \npenalties sufficient to deter gaming of transmission service subscription. Joint \nCo-Location Developers contend that a disqualification-based penalty is not necessary \nbecause transmission owners can manually disconnect a facility in case of potential \nsevere reliability risk. Joint Co-Location Developers assert that failure to respond to \ncurtailment would have a similar impact from a resource adequacy perspective to a \ncapacity resource failing to perform during emergency events, in which case only a \nnon-performance charge is assessed. Joint Co-Location Developers urge that, if the \nCommission adopts disqualification as a penalty, the Commission should adopt intent (or \nat least fault), materiality, and repetition elements prior to disqualification to ensure \ndisqualification sends an actionable signal.'°°5  Joint Co-Location Developers suggest that \nthat an operational penalty is excessive for misoperation of control technologies or \nprotection systems because misoperation without withdrawal does not risk system \nharm 1°°6 \n499.\nIndicated TOs propose a financial penalty charge structure with two components: \n(1) a base penalty charge; and (2) a penalty ratchet.1°°7  The base penalty charge would be \nassessed for any hour in which at least one five-minute interval occurs during which a \ncustomer's metered load at the Point of Interconnection exceeds its reserved transmission \nservice. The penalty ratchet would apply additional daily penalties if exceedances \noccurred in more than one hour during a day, additional weekly penalties if exceedances \noccurred on more than one day during a week, and additional monthly penalties if \nexceedances occurred in more than one week during a month. Further, each of these \npenalties would entail escalating financial liabilities for repeated penalties, which \nIndicated TOs argue would reinforce the expectation that Co-Located Load customers \nmanage their load in a manner consistent with their reserved transmission service. \n500.\nNOVEC states that a penalty for unreserved use in addition to disqualification and \npause-in-service rules is appropriate, as this penalty would be an additional deterrent that \nwould help make the market or other ratepayer whole if a Co-Located Load customer \nexceeds its contract demand.'°°8  NOVEC suggests that any financial penalty should \ncompensate other customers for any harm caused by the Eligible Customer's departure \nImm  Id at 24-25. \n1005  Id at 26 (citing PJM Interconnection, L.L.C., 178 FERC ¶ 61,104, at PP 60-61 \n(2022)). \n1006  Id at 26. \n1\" 7  Indicated TOs Response Brief at 12-13. \n1008 NOVEC Response Brief at 13 (citing Indicated TOs Initial Brief at 20). \n379 of 515"},{"page":90,"startToken":37501,"endToken":37946,"text":"Document Accessigtr:4q-2-30QA18-3[2@cument:Flitd \n( ,)8/C18/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 223 - \nfrom Co-Location requirements or, if there is no harm, be set at a level sufficient to \nencourage compliance with the Tariffs scheduling requirements. \n501.\nODEC suggests that the Commission also consider whether any protections are \nneeded for local utilities or transmission owners should they need to take the \nextraordinary measure of disconnecting an Eligible Customer taking service on behalf of \nCo-Located Loads, if the Eligible Customer's use of the transmission system exceeds \ncontract demand or is called upon for load shedding and curtailment.10°9  ODEC states \nthat, in such instance, the local utility or transmission owner should not be liable for \nlegal, financial, or other damages that might be experienced by an Eligible Customer. \nNOVEC asserts that PJM's penalty language should be revised to specify that when an \nEligible Customer serves multiple Co-Located Loads, only the culpable Co-Located Load \nis disqualified rather than the Eligible Customer as a whole.'°'° \n3. \nReply Briefs \n502.\nPJM argues that monetary penalties, in place of non-monetary penalties, would \nundermine the value of reliability and hand it to a single site or a class of load that may \ndecide to pay the penalty in place of operating as agreed to ensuring overall system \nreliability.1011 PJM alleges that non-monetary operational penalties are essential to the \nresponsible integration of large loads. PJM maintains that its non-monetary operational \npenalties represent a measured approach that balances significant reliability concerns \nwith the interest in integrating large loads quickly. However, PJM notes that, in response \nto protesters' concerns, PJM proposes revisions to its illustrative tariff language to add \ndiscretion to the strict application of non-monetary operational penalties. \n503.\nPJM argues that the Commission did not foreclose non-monetary penalties \nbecause the December Order \"also direct[s] parties to brief . . . any other remedial action \nthat PJM should take to address withdrawals in excess of the contract demand.\"1\" 2  PJM \nalso claims that financial penalties alone are insufficient to support reliability in light of \nthe volume of load that is anticipated to come online in short order and the nature of how \nthese new loads will seek to connect through co-location with potentially critical \ngenerators. PJM rejects Vistra's contention that non-monetary penalties are a departure \nfrom Commission precedent, and responds that the Commission has long held that where \nmonetary penalties do not incentivize actions consistent with reliability, it may be \n1009 ODEC Response Brief at 11-12. \n1°1°  NOVEC Response Brief at 14-15. \n1011  PJM Reply Brief at 40-43. \n1°12  Id. at 49-50 (quoting December Order, 193 FERC ¶ 61,217 at P 212). \n380 of 515"},{"page":91,"startToken":37946,"endToken":38382,"text":"Document AccessigPSP; 2q\"21\n.1.8-3419curnent:Flild rEq99: APA8/2pate Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 224 - \nnecessary to implement \"a range of non-monetary and monetary penalties\" to promote \nbehavior that supports and improves the reliability of the bulk power system.1013  PJM \nrejects Joint Co-Location Developers' suggestion that PJM adopt financial penalties \nsufficient to deter gaming, and responds that PJM's proposed penalty structure is not \nintended to address gaming but to support reliability. In response to Joint Co-Location \nDevelopers' suggestion that disqualification is unnecessary because transmission owners \ncan manually disconnect a facility, PJM argues that it is inconsistent with reliable \noperation of the transmission system to shift responsibility away from the Eligible \nCustomer. PJM also alleges that it and the transmission owner will become aware of an \nimproperly set-up protection scheme only after the misoperation incident, which will \nexpose the PJM system to risk. PJM adds that when a transmission owner manually cuts \nload suddenly, without proper coordination, it can have disastrous and dangerous \ncascading system effects.'°14 \n504.\nNevertheless, PJM proposes revisions to its illustrative tariff language to permit, \nwhere appropriate, PJM to exercise discretion in determining when disqualification \npenalties are appropriate based on PJM's assessment of factors including the reliability \nimpact of the failure to curtail or shed load or the misoperation of control technologies or \nprotection system schemes. PJM adds that, with these revisions, the Eligible Customer \ntaking transmission service on behalf of Co-Located Load will not be held liable for the \nactions of others. 1015 \n505.\nSeveral parties agree that financial penalties are insufficient to ensure \nreliability.1016 ODEC asserts that it does not agree that PJM's proposed suspension and \ndisqualification measures are unfairly imposed regardless of fault and will make the \nservices unduly risky for many loads. Earthjustice argues that PJM's operational \npenalties are proportionate to the prospective harm associated with a customer's failure to \nfollow curtailment orders. Earthjustice argues that, while opposing commenters note that \nPJM's proposed penalties are stricter than the penalties it has levied in other \ncircumstances, those comments fail to acknowledge that the stakes here are higher. \n1013 Id at 51 (quoting Rules Concerning Certification of the Elec. Reliability Org.; \nand Procs. for the Establishment, Approval, and Enf't of Elec. Reliability Standards, \nOrder No. 672, 114 FERC ¶ 61,104, at PP 49, 455, order on reh'g, Order No. 672-A, \n114 FERC ¶ 61,328 (2006)). \n'°14 Id at 52-53. \n1015  Id. at 54. \n1016 ODEC Reply Brief at 4-5; Earthjustice Reply Brief at 2-3, 5, 8; Indicated TOs \nReply Brief at 14-15 (citing Joint Blazunas/Schafer/Hammer Rebuttal Test. at 4). \n381 of 515"},{"page":92,"startToken":38382,"endToken":38790,"text":"Document AccessigP#: qq-266A18-349cument:Fht d  yaN9: A8;21812 p1Ate Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 225 - \nEarthjustice argues that PJM's penalty proposal is appropriately designed to protect \nsystem reliability, rather than assign fault. \n506.\nIndustrials/Amtrak urge the Commission to exercise caution in overly harsh \noperational penalties, especially for existing retail customers who may be forced to move \nfrom retail BTMG arrangements to Co-Location Arrangements. Industrials/Amtrak \nargue that it is reasonable to pay financial penalties, but a retail customer should not be \nbanned from NFCD transmission service for a lone violation.1017 \n507.\nPJM rejects Vistra's contention that its non-monetary penalties for misoperation of \nnecessary control technologies or protection systems are unduly discriminatory. PJM \nalleges that NERC, Market Monitor, and PJM's 2026 load forecast each demonstrate that \nthe new large loads integrating into PJM's transmission system are not similarly situated \nto traditional loads. PJM adds that disqualification penalties do not foreclose Eligible \nCustomers from taking transmission service entirely, and that, where Eligible Customers \ndemonstrate that they cannot (or are unwilling to) limit withdrawals, it is appropriate for \nthose Eligible Customers to take NITS.1°18 \n508.\nIndicated TOs reject Constellation's argument that PJM should simply adopt \nfinancial penalties as is the case with SPP's High Impact Large Load (HILL) process.1°19 \nIndicated TOs argue that SPP's HILL process is different in that, under PJM's proposal, \nCo-Located Load customers may be in the position of installing and operating their own \ncontrol technologies and protection systems. Indicated TOs further argue that PJM and \nSPP are different regions with different characteristics, including topology and \nproliferation of large loads. Indicated TOs also dismiss DCC's and Vistra's concerns \nregarding Co-Located Load's liability for penalties associated with control technologies \nand protection systems operated by other parties, including transmission owners. \nIndicated TOs argue that installation of redundant protection facilities by transmission \nowners should not serve as an excuse for the failure of customers to properly maintain \nand operate their own equipment. \n509.\nNOVEC states that it generally supports Indicated TOs' proposed financial penalty \ncharge structure, subject to Indicated TOs providing further information.1020  ODEC \nsupports financial penalties but states that PJM's implementation of its penalties must not \nsubject ODEC or its member distribution cooperatives to service interruptions or \n1017 Industrials/Amtrak Reply Brief at 17-18. \n1018 PJM Reply Brief at 43, 45, 47. \n1019 Indicated TOs Reply Brief at 15-16. \n1°2°  NOVEC Reply Brief at 26-27. \n382 of 515"},{"page":93,"startToken":38790,"endToken":39194,"text":"Document AccessiggSg Z-P12-1§)?i18-3Q9ument:FlAd \nAg812pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 226 - \ndisqualification, or financial penalties, as a result of requiring ODEC to serve as the \nEligible Customer.1°21 \n510.\nIndicated TOs further explain their financial penalty proposal, explaining that \nwhen a Co-Located Load exceeds its reserved transmission service limit, which includes \nany reductions based on curtailments directed by PJM, the base penalty charge will be \nassessed for any hour (Exceedance Hour) in which at least one five-minute interval \n(Exceedance Interval) occurs during which a customer's metered load at the point of \ndelivery exceeds its reserved transmission service. Indicated TOs state that the base \npenalty charge will apply to each Exceedance Hour.1°22 \n511.\nIndicated TOs state that the base penalty charge will be calculated as the product \nof the Hourly Exceedance MW, the Equivalent Hourly FCD transmission service rate, \nand the number of Exceedance Intervals within the hour, where the Hourly Exceedance \nMW is equal to the maximum telemetered load during the hour less the reserved \ntransmission service limit for the hour and where the Equivalent Hourly FCD \ntransmission service rate is equal to the FCD transmission service rate divided by \n8,760 hours.1023  Indicated TOs explain that the FCD transmission service rate is used as \nthe basis for assessing the penalty because, when a customer exceeds its reserved \ntransmission service limit without authorization, the excess usage effectively imposes \nfirm-level demand on the system. \n512.\nIndicated TOs state that the penalty ratchet applies escalating FCD-equivalent \ntransmission service rates as the frequency of unreserved transmission use increases. \nIndicated TOs explain that the penalty ratchet applies daily, weekly, monthly, or annual \npenalty charges depending on whether exceedances occur within the same calendar day, \nweek, month, or year, and that these penalty charges are equal to the Daily \nFCD-Equivalent Rate, Weekly FCD-Equivalent Rate, Monthly FCD-Equivalent Rate, \nand FCD Annual Rate, respectively.1°24  Indicated TOs further explain that, where a daily \npenalty charge is assessed, it is in addition to the base penalty charge applicable to each \nindividual Exceedance Hour; where a weekly penalty charge is assessed, it is in addition \nto the base penalty charges and daily penalty charges; and so on. \n1021  ODEC Reply Brief at 4. \n1°22  Indicated TOs Reply Brief at 16-17. \n1°23  Indicated TOs Reply Brief, Joint Blazunas/Schafer/Hammer Rebuttal Test. \nat 8-9. \n1°24  Id. at 10-14. \n383 of 515"},{"page":94,"startToken":39194,"endToken":39677,"text":"Document Acc„sigi@SP; 2AAZ18-3Q@cument:Flitd  p@g9: A8/48/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 228 - \nof the date of issuance of this order, a compliance filing to revise its Tariff consistent \nwith these findings. \n516.\nSecond, we find that it is just and reasonable to establish an operational penalty of \nsuspension in service for a period of up to 120 days for an Eligible Customer taking \nInterim NITS, FCD, and/or NFCD transmission service after the first misoperation of \nnecessary control technologies and/or protection systems given the reliability risks \nassociated with such misoperation. However, as above, we disagree with PJM's proposal \nregarding disqualification, and we instead find that it is just and reasonable to establish an \noperational penalty whereby, after the second misoperation of necessary control \ntechnologies and/or protection systems, PJM will terminate the transmission service \nagreement with the Eligible Customer taking Interim NITS, FCD, and/or NFCD \ntransmission service on behalf of Eligible Load. We direct PJM to file, within 60 days of \nthe date of issuance of this order, a compliance filing to revise its Tariff consistent with \nthese findings. \n517.\nThird, we find that it is just and reasonable to subject an Eligible Customer taking \nany of the three new transmission services on behalf of Eligible Load to financial \npenalties in any circumstance where the transmission customer uses transmission service \nthat it has not reserved. We thus direct the PJM transmission owners to file, within \n60 days of the date of issuance of this order, a compliance filing that effectuates Indicated \nTOs' proposed framework for financial penalties for Eligible Customers taking one of the \nthree new transmission services that withdraw from the transmission system in excess of \ntheir contract demand level (i.e., for unreserved use). \n518.\nBefore addressing each topic in turn, as an initial matter, we disagree with \nprotesters that operational penalties, either for failure to follow a curtailment or load \nshedding directive, or for misoperation of necessary control technologies and/or \nprotection systems, \"diverg[e] from\" or were \"not contemplated\" in the December \nOrder.1°29  The financial penalties that the Commission required only apply to Eligible \nCustomers' unreserved use of the transmission system and are consistent with the \nCommission's directives in the December Order.'°3°  The Commission has previously \nfound that transmission customers should be subject to unreserved use penalties in \ncircumstances where a transmission customer uses transmission service in excess of its \n1029 Constellation Response Brief at 19; Vistra Response Brief at 29. \n1030 December Order, 193 FERC 1161,217 at P 212 (directing a penalty rate for \nexcess withdrawals of energy from the transmission system by an Eligible Customer \ntaking FCD transmission service on behalf of a Co-Located Load); id. P 217 (directing \nsame as to excess withdrawals by an Eligible Customer taking NFCD transmission \nservice on behalf of a Co-Located Load). \n385 of 515"},{"page":95,"startToken":39677,"endToken":40171,"text":"Document Accessigir; qq\"2306,A18-3r-.28curnent:Flil d rPa gp: A8/6.8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 229 - \nreserved capacity or if it uses transmission service where it does not have a reservation, \nand as discussed further below, we find it just and reasonable that an Eligible Customer \ntaking any of the three new transmission services on behalf of Eligible Load incur a \nfinancial penalty for unreserved use of the transmission system.1031  But the Commission \nalso directed briefing broadly on the rates, terms, and conditions of the new transmission \nservices, including \"other remedial action[s]\" in addition to financial penalties, as \npertinent to this question.'°32  We find that an operational penalty for Eligible Customers \ntaking Interim NITS, FCD transmission service, and/or NFCD transmission service on \nbehalf of Eligible Load for misoperation of necessary control technologies and/or \nprotection systems is consistent with the December Order's finding that Eligible \nCustomers may take Interim NITS, FCD transmission service, and/or NFCD transmission \nservice because it is the use of necessary control technologies and/or protection systems \nthat effectively limits their energy withdrawals from the transmission system.1°33  The \nCommission in the December Order also broadly sought briefing on the appropriate \nprocedures to govern circumstances under which PJM curtails an Eligible Customer \ntaking any of the three new transmission services, and we find that an operational penalty \nfor an Eligible Customer taking the new transmission services on behalf of Eligible Load \nfailing to follow a curtailment or load shedding directive is within the scope of provisions \nthat we can consider as part of establishing curtailment procedures for the three new \ntransmission services. \na. \nFailure to Follow Curtailment or Load Shedding Directive \n519. \nWe find that it is just and reasonable to establish an operational penalty for an \nEligible Customer taking any of the new transmission services on behalf of Eligible Load \nafter the second instance of failing to follow a curtailment or load shedding directive. \nSpecifically, we find that it is just and reasonable for PJM to terminate the transmission \nservice agreement with the Eligible Customer taking Interim NITS, FCD transmission \nservice, or NFCD transmission service on behalf of Eligible Load after the second \ninstance of failing to follow a curtailment or load shedding directive. We direct PJM to \nfile, within 60 days of the date of issuance of this order, a compliance filing to revise its \nTariff consistent with this finding. PJM persuasively argues that there are significant \nreliability risks associated with failure to curtail, and \"financial penalties, alone, are not \nsufficient to incentivize Eligible Customers to comply with Load Shed and \nCurtailment.\"1034  However, we agree with concerns raised in the record that PJM's \n1031 Order No. 890, 118 FERC ¶ 61,119 at P 834. \n1032  December Order, 193 FERC ¶ 61,217 at P 219. \n1033  Id. P 205; see supra Part VI.C. \n1034 PJM Initial Brief at 41-42, 45, 50. \n386 of 515"},{"page":96,"startToken":40171,"endToken":40667,"text":"Document AccessiciPc; 2YAC618-3R@P-Irnent:Filld S'AV: (4A8/2pAte Filed: 10116/2026 \nDocket No. EL25-49-002, et al. \n- 230 - \nproposal to disqualify an Eligible Customer taking one of the three new transmission \nservices on behalf of Eligible Load from continuing to take any of those services is \nunnecessarily strict. When considering the need to ensure reliability is preserved, as well \nas to allow Eligible Customers taking transmission service on behalf of Eligible Load to \nadapt to a new transmission service paradigm, we find that, on balance, complete \ndisqualification is excessive because it would impose penalties on the Eligible Customer \nthat apply to all of its transmission service agreements, even those for which it has \nfollowed all curtailment or load shedding directives. However, we agree with PJM that a \nstrict operational penalty will deter conduct contrary to the fundamental principle upon \nwhich the new transmission services required by the December Order were based, which \nis that Eligible Customers taking service on behalf of Co-Located Loads are willing and \nable to limit their energy withdrawals from the transmission system under certain \nconditions.1035  We therefore find, as part of the just and reasonable replacement rate, that \nthe transmission service agreement with the Eligible Customer taking Interim NITS, FCD \ntransmission service, or NFCD transmission service on behalf of Eligible Load should be \nterminated on the second instance of failing to follow a curtailment or load shedding \ndirective. The Eligible Customer will remain eligible to take the three new transmission \nservices on behalf of other Eligible Loads through its other transmission service \nagreements. NITS remains an option for an Eligible Customer disqualified from taking \none of the new transmission services; however, such Eligible Customer may not begin \ntaking NITS until all necessary Network Upgrades are completed.1°36 \n520. Recognizing that we are not adopting the exact penalty framework for failing to \nfollow a curtailment or load shedding directive that PJM proposes, we nevertheless \ndisagree with many of protesters' arguments on this matter. Joint Co-Location \nDevelopers, for example, argue that disqualification is not necessary because \ntransmission owners can manually disconnect a facility. This argument supports PJM's \npremise that a financial penalty alone cannot deter the Eligible Customer taking one of \nthe three new transmission services on behalf of Co-Located Load from failing to control \nunauthorized withdrawals; instead, it unreasonably and unnecessarily shifts the \nresponsibility to manage complying with the Tariff and the terms of the transmission \nservice from the Eligible Customer to the transmission owners. Joint Co-Location \n1035 December Order, 193 FERC ¶ 61,217 at P 177 (\"we also find that PJM's \nTariff is unjust and unreasonable because it does not include transmission services that \nreflect Eligible Customers taking service on behalf of Co-Located Loads that are willing \nand able to limit their energy withdrawals from the transmission system under certain \nconditions.\"). \n1036  See PJM Initial Brief at 43 (\"Importantly, however, such an Eligible Customer \nmay take NITS, which would begin after all necessary upgrades are placed into \nservice.\"). \n387 of 515"},{"page":97,"startToken":40667,"endToken":41023,"text":"Document AccessigPSA: 4q-AQA18-3R9cument:Fhld \nX3,818/2\n to Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 231 - \nDevelopers also claim that disqualification is disproportionate and may not send an \nactionable signal without \"fault or materiality elements.\" This argument is misplaced, as \nPJM's requirements for the new transmission services make the Eligible Customer's \nresponsibilities clear and actionable: prior to commencement of service, the Eligible \nCustomer must demonstrate to PJM's satisfaction that it can fully comply with load \nshedding and curtailment procedures. Lastly, Joint Co-Location Developers suggest that, \nthe Commission's approval of a non-performance charge rate for capacity resources that \nfail to perform in emergency events means that an Eligible Customer that fails to follow a \ncurtailment or load shedding directive can be sufficiently penalized through a similar \ncharge. Joint Co-Location Developers allege that failure to respond or perform in both \nthese circumstances is similar from a resource adequacy perspective. We disagree that \nthe two are comparable. Capacity resources are purchased to meet the needs of \ntransmission customers taking existing firm service, such as NITS. As PJM explains in \nits initial brief, the choice to take NITS decreases the likelihood of significant issues \narising from failure to curtail.1037  By contrast, the Commission created the three new \ntransmission services to reflect that Eligible Customers taking transmission service on \nbehalf of Co-Located Load are willing and able to limit their energy withdrawals from \nthe transmission system under certain conditions that are different than those under which \nNetwork Customers take NITS.1038  For these reasons, we find that it is just and \nreasonable to subject Eligible Customers on behalf of such loads to a stricter penalty \nregime. \n521. \nWe also disagree with Constellation's suggestion that the Commission should \nadopt SPP's approach for CHILLS, which contains only penalties for exceeding the \ntransmission customer's reserved capacity.1039  The Commission has permitted regional \n1037  Id. at 48-49. \n1°38  December Order, 193 FERC 1161,217 at P 2; see, e.g., id. P 208 \n(distinguishing an Eligible Customer's rights under FCD transmission service in contrast \nto NITS). \n1039  Sw. Power Pool, Inc., 195 FERC ¶ 61,196, at 98 (2026). \n388 of 515"},{"page":98,"startToken":41023,"endToken":41493,"text":"Document Acc„sigPSg 2-ArArCg18-34Pcument:Flild \ne:\nFiled: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 232 - \nvariation among RTOs/ISOs'°4°  and need only explain its choice and how it has chosen a \njust and reasonable rate.'°4' \n522. We also find that ODEC has not demonstrated a need, nor does the record \ndeveloped in this paper hearing otherwise reflect a need, to establish protections for \ntransmission owners if the Eligible Customer may experience damages as a result of the \ntransmission owner disconnecting the Eligible Customer. Lastly, with respect to Joint \nCo-Location Developers' concern that PJM's proposed disqualification rules will \ndissuade Eligible Customers from taking the new transmission services because of the \nrisk of stranding or undermining investments in the new transmission services, we note \nthat an Eligible Customer is not required to take the new transmission services and may \nelect to take NITS if that transmission service option better reflects the Eligible \nCustomer's use of the transmission system and risk profile.'°42 \n1040 See, e.g., Reg 'l Transmission Orgs., Order No. 2000, FERC Stats. & Regs. \n1131,089, at 31,073 (1999) (cross-referenced at 89 FERC ¶ 61,285), order on reh'g, \nOrder No. 2000-A, FERC Stats. & Regs. ¶ 31,092 (2000) (cross-referenced at 90 FERC \n¶ 61,201), aff'd sub nom. Pub. Util. Dist. No. 1 of Snohomish Cnty. v. FERC, 272 F.3d \n607 (D.C. Cir. 2001) (stating there is no \"one size fits all\" approach to RTO governance); \nOffer Caps in Mkts. Operated by Reg'l Transmission Orgs. & Indep. Sys. Operators, \nOrder No. 831, 157 FERC ¶ 61,115, at P 147 (2016), order on reh'g & clarification, \nOrder No. 831-A, 161 FERC ¶ 61,156 (2017) (permitting regional variation for treatment \nof incremental energy offers above $1,000/MWh that the RTO/ISO or Marketing \nMonitoring Unit cannot verify prior to the start of the market clearing process); \nWholesale Competition in Regions with Organized Elec. Mkts., Order No. 719, \n125 FERC ¶ 61,071, at P 62 (2008), order on reh'g, Order No. 719-A, 128 FERC \n1161,059, order on reh'g, Order No. 719-B, 129 FERC ¶ 61,252 (2009) (permitting \nregional variation for RTOs/ISOs developing requirements for demand response \nresources participating in ancillary service markets). \n1041 See ExxonMobil Oil Corp. v. FERC, 487 F.3d 945, 955 (D.C. Cir. 2007) (\"We \nneed not decide whether the Commission has adopted the best possible policy as long as \nthe agency has acted within the scope of its discretion and reasonably explained its \nactions.\"); Cities of Batavia v. FERC, 672 F.2d 64, 84 (D.C. Cir. 1982) (\"[T]he billing \ndesign need only be reasonable, not theoretically perfect.\"). \n1042 See PJM Reply Brief at 47 (arguing that disqualification penalties reflect that \nEligible Customers take the level of transmission service that aligns with their \ndemonstrated use of the transmission system). \n389 of 515"},{"page":99,"startToken":41493,"endToken":41982,"text":"Document AccessigP SA qq-Aq-18_,RwurnentAlt d EpAg9: ANB/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 233 - \nb. \nMisoperation of Necessary Control Technologies and/or \nProtection Systems  \n523.\nWe find that it is just and reasonable to establish an operational penalty of \nsuspension in service for a period of up to 120 days for an Eligible Customer taking \nInterim NITS, FCD, and/or NFCD transmission service on behalf of Eligible Load after \nthe first misoperation of necessary control technologies and/or protection systems. \nHowever, as noted above, we disagree with PJM's proposal regarding disqualification, \nand we instead find that it is just and reasonable to establish an operational penalty \nwhereby, after the second misoperation of necessary control technologies and/or \nprotection systems, PJM will terminate the transmission service agreement with the \nEligible Customer taking Interim NITS, FCD transmission service, or NFCD \ntransmission service on behalf of Eligible Load. We direct PJM to file, within 60 days of \nthe date of issuance of this order, a compliance filing to revise its Tariff consistent with \nthese findings. \n524.\nWe agree with PJM that there are significant reliability risks associated with \nmisoperation of special protection schemes, and that \"financial penalties, alone, are not \nsufficient to incentivize Eligible Customers to comply with . . . control technology and \nprotection system obligations.\"1043  We find that this replacement rate serves to deter \nconduct contrary to the fundamental principle around which the new transmission \nservices created by the Commission were based, i.e., that Eligible Customers taking \nservice on behalf of Co-Located Loads are willing and able to limit their energy \nwithdrawals from the transmission system under certain conditions.1044  Moreover, we \nagree with PJM that, after the first misoperation of necessary control technologies and/or \nprotection systems, suspension of service for a period of up to 120 days is reasonable to \nallow for an analysis by PJM, and the affected transmission owner(s) as necessary, of the \noperational performance of the necessary control technologies and/or protection systems. \n1043 PJM Initial Brief at 41-42, 45, 50. \n1044 December Order, 193 FERC ¶ 61,217 at P 177 (\"we also find that PJM's \nTariff is unjust and unreasonable because it does not include transmission services that \nreflect Eligible Customers taking service on behalf of Co-Located Loads that are willing \nand able to limit their energy withdrawals from the transmission system under certain \nconditions.\"); see id. P 205 (\"We note that, in general, special protection schemes allow \nEligible Customers on behalf of Co-Located Load to effectively limit their withdrawals \nfrom the transmission system. For these reasons, in these instances where the \nCo-Location Arrangement includes special protection schemes that limit its energy \nwithdrawals, we find that it is a just and reasonable replacement rate to allow an Eligible \nCustomer taking transmission service on behalf of such load to take and be charged for \nnew types of transmission service that are alternatives, and not equivalent, to NITS.\"). \n390 of 515"},{"page":100,"startToken":41982,"endToken":42441,"text":"Document AccessigPSA:  2kgits418-3QPcument:Flild rpaN9: A39/118/2p2ate Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 234 - \nIn response to the Indicated TOs, we find that it is reasonable that the Tariff provide that \nservice may resume following PJM's approval, as well as the relevant transmission \nowner's approval of the necessary control technologies and/or protection systems for \nconsistency with the transmission owner's technical standards. \n525. However, we reject PJM's proposal not to apply such a penalty to Eligible \nCustomers taking FCD transmission service on behalf of Co-Located Load, consistent \nwith our findings above that Eligible Customers taking FCD transmission service on \nbehalf of Co-Located Load must also have necessary control technologies and/or \nprotection systems to limit their energy withdrawals from the transmission system to their \ncontract demand level.1045  We also disagree with protesters' arguments opposing PJM's \nproposal to establish an operational penalty for misoperation of necessary control \ntechnologies and/or protection systems. Vistra suggests that PJM's proposal unduly \ndiscriminates against Co-Location Arrangements as compared to other entities using \nspecial protection schemes, but this penalty proposal (which Vistra mistakenly alleges \napplies only to special protection schemes) is not relevant to existing transmission \nservices in PJM.1046  By contrast, as discussed above, correct operation of necessary \ncontrol technologies and/or protection systems is foundational to the new transmission \nservices. Vistra's separate claim that PJM's proposal is unduly discriminatory \"insofar as \nit treats unreserved use of the transmission system by point-to-point customers differently \nfrom unreserved use by customers taking these new transmission services\" is misplaced. \nIn contrast to Eligible Customers taking Interim NITS, FCD transmission service, and/or \nNFCD transmission service on behalf of Eligible Load, PTPS customers are not required \nto establish necessary control technologies and/or protection systems in order to take \nPIPS .1047  We also find unpersuasive Joint Co-Location Developers' allegation that this \noperational penalty is even more excessive, as compared to a penalty for failure to follow \ncurtailment or load shedding directives, because misoperation without withdrawal does \nnot risk system harm.'°48  We agree with PJM that \"[w]hen a control technology or \nprotection scheme misoperates, there can be serious consequences.i1049  Where PJM \n1°45  See supra Part VI.C. \n1046  See PJM Initial Brief at 47 (justifying its proposal to allow that an Eligible \nCustomer disqualified from the new transmission services may take NITS because \n\"NITS, in and of itself, addresses Curtailment, Load Shed, and control technology or \nprotection scheme misoperation risk\"). \n1047 Id. at 50 (\"PJM supports a penalty for unreserved use in addition to the \ndisqualification and pause-in-rules discussed above.\"); see id. at 41 (Table 1 (Penalties)). \n1048 Joint Co-Location Developers Response Brief at 26. \n1049  PJM Initial Brief at 43, 45; PJM Reply Brief at 52-53. \n391 of 515"},{"page":101,"startToken":42441,"endToken":42879,"text":"Document Acc„sig SK qq-Aqq-18-34PcurnentFhla EPa.@9: Ap/48/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 235 - \nplans and operates the system around an assumption that necessary control technologies \nand/or protection systems will work, unexpected system behavior due to misoperation \nrisks system reliability regardless of whether withdrawals occur, and we find that it is \nreasonable not to rely only on financial penalties to mitigate these risks. \n526.\nWe disagree with Constellation's suggestion that the Commission should adopt \nSPP's approach from CHILLS, which contains only penalties for exceeding the \ntransmission customer's reserved capacity,'°5°  but not suspension or disqualification, for \nthe same reasons discussed above. \n527.\nWe agree with NOVEC that PJM's proposed penalty language to disqualify the \nEligible Customer as a whole from taking the relevant transmission service is not just and \nreasonable. Instead, we direct PJM to propose on compliance Tariff provisions providing \nthat, after the second misoperation of necessary control technologies and/or protection \nsystems pertaining to a transmission service agreement governing an Eligible Customer \ntaking Interim NITS, FCD transmission service, and/or NFCD transmission service on \nbehalf of Eligible Load, PJM will terminate the transmission service agreement. The \nEligible Customer could still take transmission service, including Interim NITS, FCD \ntransmission service, and NFCD transmission service, on behalf of other loads through \nother transmission service agreements. \n528.\nODEC asserts that PJM's implementation of its penalties must not subject ODEC \nor its member distribution cooperatives to service interruptions or disqualification, or \nfinancial penalties, as a result of requiring ODEC to serve as the Eligible Customer. The \nCommission set a replacement rate in the December Order applicable to Eligible \nCustomers taking transmission service on behalf of Co-Located Load. The operational \n(and financial) penalties we establish in this order apply to Eligible Customers who elect \nto take the new transmission services on behalf of Eligible Load and who do not comply \nwith the terms and conditions of the new transmission services, including misoperation of \nnecessary control technologies and/or protection systems. The December Order does not \nrequire that Eligible Customers on behalf of Co-Located Load take one of the new \ntransmission services and they may choose to take NITS instead. The Co-Located Load \ncannot force an Eligible Customer to take a type of transmission service it does not wish \nto take. As the Commission explained in the December Order, NITS remains a just and \nreasonable transmission service option that an Eligible Customer on behalf of a \nCo-Located Load may choose.1051 \n1050 Sw. Power Pool, Inc., 195 FERC ¶ 61,196 at 98. \n1051  December Order, 193 FERC ¶ 61,217 at P 195. \n392 of 515"},{"page":102,"startToken":42879,"endToken":43342,"text":"Document AccessigPA 2A2-V;tg18-3PSc ument:Flil d  d:),,age. 7,93 \nDate Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 236 - \nc. \nUnreserved Use of the Transmission System \n529. We find that it is just and reasonable to impose a financial penalty on an Eligible \nCustomer taking any of the new transmission services on behalf of Eligible Load for \nunreserved use of the transmission system. We find that it is just and reasonable to use \nIndicated TOs' two-part penalty framework and to apply, within that framework, a \npenalty rate that is twice the rate we establish in this order for FCD transmission \nservice.'052  Indicated TOs propose a base penalty charge for each hour in which the \nEligible Customer's reserved service limit is exceeded at the Point of Interconnection \nduring at least one five-minute interval (Exceedance Hour) and a penalty ratchet when \nexceedances occur repeatedly.1°53  Specifically, Indicated TOs propose that, if more than \none Exceedance Hour occurs on the same day, then an additional daily penalty applies; if \nexceedances occur on multiple days within the same week, an additional weekly penalty \napplies; if exceedances occur in multiple weeks within the same month, then an \nadditional monthly penalty applies; and if exceedances occur in multiple months within \nthe same year, then an additional annual penalty applies.'054  We agree with Indicated \nTOs that progressively increasing the consequences of repeated penalties encourages \nEligible Customers to manage their usage consistent with their reserved transmission \nservice limit.1°55  We note that Indicated TOs submit testimony indicating that they \npropose to distribute revenues collected from financial penalty charges on a monthly \nbasis to Eligible Customers taking NITS and FCD transmission service. However, we \nfind that unreserved use penalties should be distributed to all non-offending transmission \n1052 See Order No. 890, 118 FERC ¶ 61,119 at P 848 (\"As a result, we establish a \nrebuttable presumption that unreserved use penalties no greater than twice the firm \npoint-to-point rate for the penalty period defined above are just and reasonable.\"); id. \nP 846 (basing penalty charges on the period of unreserved use and determining that, as a \ngeneral rule, more than one assessment for a given duration will increase the penalty \nperiod to the next longest duration). \n1053 Indicated TOs Response Brief at 12 (\"When a Co-Located Load exceeds its \nreserved transmission service limit, the base penalty charge will be assessed for any hour \nin which at least one five-minute interval occurs during which a customer's metered load \nat the point of interconnection exceeds its reserved transmission service.\"); Indicated TOs \nReply Brief at 16. \n1054 Indicated TOs Reply Brief at 16; Indicated TOs Reply Brief, Ex. \nNo. PTO-0005 at 7. \n1°55  Indicated TOs Response Brief at 12-13; Indicated TOs Reply Brief at 17. \n393 of 515"},{"page":103,"startToken":43342,"endToken":43725,"text":"Documerit A„„sigi\nSP; Z-Q-2(qA-1.8-3[29curnent:Flita rPA09:A918/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 237 - \ncustomers consistent with Order No. 890.1056 We direct the PJM transmission owners \nto file, within 60 days of the date of issuance of this order, a compliance filing consistent \nwith these findings. \nE. \nAnti-Toggling Mechanisms for Firm Contract Demand Transmission  \nService  \n530.\nIn the December Order, the Commission found that FCD transmission service \nshould have a minimum term of one year, but that PJM should propose an anti-toggling \nmechanism for Eligible Customers switching between FCD and NFCD transmission \nservice.1057 \n1. \nInitial Briefs  \n531.\nPJM proposes an anti-toggling mechanism to prevent transmission customers from \nswitching between FCD and NFCD transmission services by providing that the portion of \nthe Co-Located Load served by FCD transmission service is not eligible to be served by \nNFCD transmission service for five years following the effective date of the Service \nAgreement. Conversely, PJM explains, it does not bar Co-Located Load served by \nNFCD transmission service from being served by FCD transmission service in future \nyears. However, PJM proposes an exception if there is a physical change to the \nCo-Located Generator that would materially alter the MW level dedicated to the load or \nto the Co-Located Load that would materially alter the MW level of its gross demand.105s \nPJM argues this exception is necessary to ensure that, if an Eligible Customer materially \nchanges either the generation capacity or the load on a gross demand basis, the Tariff \nprovides flexibility to determine whether FCD or NFCD transmission service should be \ntaken for the new incremental portion. \n532.\nPJM also maintains that its proposed 42-month notice of termination acts as an \nanti-toggling device in a manner similar to the five-year commitment period applicable to \nthe Fixed Resource Requirement alternative in the PJM capacity market. PJM explains \nthat its notice period recognizes that PJM incorporates these loads in the capacity market, \n1056  See Order No. 890, 118 FERC ¶ 61,119 at P 860 (\"Unreserved use penalties \nare assessed against transmission customers and should, therefore, be distributed to all \nnon-offending transmission customers, whether affiliated with the transmission provider \nor not.\"). \n1057 December Order, 193 FERC ¶ 61,217 at P 213. \n1058 PJM Initial Brief at 53-54. \n394 of 515"},{"page":104,"startToken":43725,"endToken":44079,"text":"Document AccessigPA:  22q-2-lebZ1.8-3R9cument:FlAd rpAv: A9A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 238 - \nand it would unreasonably shift costs to other loads if Co-Located Loads could avoid \ncapacity charges incurred on their behalf by terminating service prematurely.10s9 \n533. Indicated TOs propose a five-year minimum commitment period for FCD \ntransmission service, arguing that doing so is necessary to ensure that FCD transmission \nservice customers cannot trigger Network Upgrades and then cease taking service, \nthereby potentially shifting costs to other transmission customers, and because it mirrors \nthe commitment period for loads seeking to procure their own capacity.1060 Indicated \nTOs argue that, where Network Upgrades are attributable to FCD transmission service \ncustomers, separate payment guarantees may be required to prevent Network Customers \nfrom being left \"holding the bag\" if an FCD transmission service customer exits the \nsystem before the costs of the Network Upgrades are fully paid.1061  Finally, Indicated \nTOs recommend that the Commission adopt the same requirements for FCD transmission \nservice that apply to notices of termination for NITS, including the 42-month notice \nperiod.1062 \n2. \nResponse Briefs \n534. NOVEC states that it supports PJM's five-year minimum service commitment and \n42-month notice requirement. NOVEC asserts that the minimum service commitment \nsends timely price signals to the capacity market, enhances market stability, and \nminimizes upgrade-related risks if a Co-Located Load withdraws. NOVEC notes that the \nnotice-of-termination period is identical to the requirements for termination of NITS and \nprevents Co-Located Loads from avoiding capacity charges by prematurely terminating \ntheir agreement.1063 \n3. \nDetermination \n535. Except as noted below, we find PJM's proposed anti-toggling mechanism to be a \njust and reasonable replacement rate. In particular, we find that PJM's proposal to \nprohibit, for a period of five years, Eligible Customers taking transmission service on \nbehalf of a Co-Located Load from taking NFCD transmission service for any portion of \n1059 Id at 54-55. \n1060 Indicated TOs Initial Brief at 21 (citing December Order, 193 FERC 1161,217 \nat P 213). \n1061  Id. at 21 n.50. \n1°62  Id at 21 & n.52. \n1063 NOVEC Response Brief at 15-16. \n395 of 515"},{"page":105,"startToken":44079,"endToken":44469,"text":"Document Acceseigi SA qW§A18-31--299ument:Flald ipaN9: Aqq8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 239 - \nCo-Located Load served by FCD transmission service will ensure that such Eligible \nCustomers do not attempt such a switch based on expected capacity market conditions, \nconsistent with the December Order.'°64  We further find that PJM's proposed 42-month \nnotice of termination provision applicable to FCD transmission service customers mirrors \nthat applicable to Network Customers and recognizes that PJM has procured capacity on \ntheir behalf. We direct PJM to file, within 60 days of the date of issuance of this order, a \ncompliance filing to revise its Tariff consistent with these findings. \n536.\nHowever, we find PJM's proposed exceptions regarding changes to the \nCo-Located Generator or Co-Located Load are not just and reasonable to the extent they \nwould permit Eligible Customers to decrease the level of contract demand for FCD \ntransmission service they take on behalf of an Eligible Load, and increase the level of \ncontract demand for NFCD transmission service, without being subject to the \nanti-toggling provision. The Commission found that the anti-toggling mechanism should \nensure Eligible Customers taking transmission service on behalf of Co-Located Loads \ncannot switch from FCD to NFCD transmission service based on expected capacity \nmarket conditions.1°65  As such, PJM's proposal is not consistent with the December \nOrder, and we direct PJM to propose an anti-toggling mechanism without an exception \nfor Eligible Customers taking FCD transmission service on behalf of Eligible Load in a \ncompliance filing within 60 days of the date of issuance of this order. \n537.\nWe also reject Indicated TOs' proposal for a five-year minimum commitment \nperiod. As Indicated TOs acknowledge, the Commission required in the December Order \nthat the minimum term for FCD transmission service should be one year.1°66  As such, we \nfind that Indicated TOs' arguments in support of its proposal are an untimely request for \nrehearing of the December Order.1067 \n1064 December Order, 193 FERC ¶ 61,217 at P 213. \n1065 Id  \n1066 Id  \n1067  See, e.g., ISO New Eng. Inc., 132 FERC ¶ 61,098 at P 12 (\"The Commission \nhas held that requests to alter a compliance filing in a manner that differs from the order \nrequiring the compliance filing constitute a collateral attack on the order requiring the \ncompliance filing.\"). \n396 of 515"},{"page":106,"startToken":44469,"endToken":44836,"text":"Document AccessigtPg 2A-ACCR18-3Q9cument:Flild rgq99:A9/718/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 240 - \nF. \nCommunications, Alarm, SCADA, or Other Requirements  \n1. \nInitial Briefs \n538.\nPJM proposes to develop telemetry requirements for Co-Located Load so that \nPJM can monitor the status of demand placed on PJM's transmission system, including \nunreserved use, to ensure reliability.1068  PJM states that it still determining the scope of \nthe tools and requirements necessary to limit withdrawals that exceed reserved use. PJM \nalso proposes to develop data exchange and metering requirements for Co-Located Load \nthat may be similar to those applicable to generation. PJM proposes to develop the \ncapability to differentiate more granularly between the transmission services available to \nEligible Customers on behalf of Co-Located Load because they are prioritized \ndifferently. PJM maintains that Eligible Customers would need to take these different \nforms of transmission service on different feeders, or cables leaving substations, to \nultimately serve the Co-Located Load. \n539.\nPJM next proposes to develop requirements and identify any relevant NERC rules \nto ensure that relay settings are consistent with the design of the necessary control \ntechnologies and/or protection systems, as set forth in each Service Agreement.1069  PJM \nasserts that transmission owners must be heavily involved in ensuring that necessary \ncontrol technology and/or protection systems are properly designed. PJM explains that it \nproposes technical requirements that must be in place prior to commencement of service \nbecause there are significant risks introduced by the necessary control technology and \nprotection systems. PJM also proposes to make changes to core Markets and Operations \nsystems to incorporate the information provided by Eligible Customers and Co-Located \nLoad to ensure reliability of the PJM transmission system. \n2. \nResponse Briefs \n540. Indicated TOs support PJM's proposal in its initial brief to develop telemetry \nrequirements and require Co-Located Load to meet such requirements in order to monitor \nCo-Located Loads' use of the transmission system.107° \n3. \nDetermination \n541. We decline to direct PJM's proposed telemetry, data exchange, metering, and \nrelay setting requirements as the replacement rate because PJM has not provided \n1°68  PJM Initial Brief at 59-61. \n1°69  Id at 60-61. \n1070 Indicated TOs Response Brief at 10-11. \n397 of 515"},{"page":107,"startToken":44836,"endToken":45271,"text":"Document AccessigsP; Z-q-2-VA-18-31-29Curnent:FlAd rraN9: A9,818/2 pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 241 - \nsufficient detail to find they are just and reasonable. PJM by its own admission has not \nfinished determining the scope of what might be necessary to limit energy withdrawals \nfrom the transmission system. Accordingly, and consistent with our determination above \nto extend the three new transmission services set forth in the December Order to Eligible \nCustomers taking service on behalf of load with BTMG that are willing and able to limit \ntheir energy withdrawals from the transmission system under certain conditions, we \ndirect PJM to file, within 60 days of the date of issuance of this order, a compliance filing \nwith Tariff revisions it deems necessary for PJM to be able to ensure that an Eligible \nCustomer has adequate telemetry, data exchange, and metering requirements such that \nPJM may monitor the Eligible Load's use of the transmission system, limit withdrawals, \nand ensure relay settings are consistent with necessary control technologies and/or \nprotection systems. \nG. \nCurtailment Procedures for Interim NITS and Non-Firm Contract \nDemand Transmission Service  \n1. \nInitial Briefs \n542.\nPJM proposes that Interim NITS and NFCD transmission service will be curtailed \nbefore FCD transmission service and NITS.1071  PJM also proposes that it may curtail \nInterim NITS or NFCD transmission service prior to dispatching the Pre-Emergency \nLoad Response Program or in response to a transfer capability shortage as a result of \nsystem reliability conditions. PJM proposes that FCD transmission service be treated \nequal to NITS for purposes of curtailment.1072  PJM states that it reserves the right to \ncurtail the three new transmission services on a non-discriminatory basis for the purpose \nof making necessary adjustments to, changes in, or repairs on its lines, substations, and \nfacilities, and in cases where continuation of service would endanger persons or property. \nPJM proposes that the Eligible Customer must shed load in accordance with previously \nestablished procedures under the relevant Service Agreement. \n543.\nPJM acknowledges that its system does not differentiate between different types of \ntransmission service because all load within PJM is currently served by NITS.1°73  Thus, \nPJM explains, core systems would need to be implemented to enable sufficient \ngranularity when shedding an Eligible Customer's Co-Located Load being served by two \ndifferent levels of transmission service, i.e., both FCD and NFCD transmission services. \nPEW clarifies that, assuming these core system design changes can be implemented, \nEligible Customers taking transmission service on behalf of Co-Located Load would \n1071 PJM Initial Brief at 63. \n1°72  Id at 64. \n1°73  Id. at 65-66. \n398 of 515"},{"page":108,"startToken":45271,"endToken":45650,"text":"Document Acc„sigPSA:  2Q121R18-34@cument:Flild )fal@ii19: Asg8, 2pAte Filed' 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 242 - \nneed to take different forms of transmission service on different feeders, or cables leaving \nsubstations, to ultimately serve Co-Located Load. \n2. \nResponse Briefs \n544.\nJoint Co-Location Developers argue that PJM fails to adequately clarify when and \nhow NFCD transmission service and Interim NITS shall be curtailed, in particular the \ncurtailment trigger.1074  Joint Co-Location Developers maintain that the curtailment \ntrigger significantly affects rates and service and is realistically susceptible of \nspecification and should be included in the tariff. Joint Co-Location Developers assert \nthat PJM does not clarify whether and how it will determine curtailment priority among \nits different classes of non-firm service, including Non-Firm PTPS, NFCD transmission \nservice, and Interim NITS. \n545.\nConstellation argues that it is discriminatory to require different feeders and would \nunnecessarily delay Co-Location Arrangements.'°7s  At minimum, Constellation asserts \nthat such a requirement should not apply in the case of Interim NITS since the \nCo-Located Load is not taking both firm and non-firm service. \n546.\nAEU/SEIA explain that the December Order established a curtailment hierarchy in \naccordance with which Interim NITS and NFCD transmission service will be curtailed \nbefore NITS and FCD transmission service and before pre-emergency demand response \nresources are dispatched.1076  AEU/SEIA claim that PJM's implementation of this \nhierarchy is contradictory because PJM states that it \"may\" curtail Interim NITS and \nNFCD transmission service prior to dispatching the Pre-Emergency Load Response \nProgram and that it \"will\" curtail Interim NITS and NFCD transmission service before \ndemand response resources are called upon to reduce load.1077  AEU/SEIA argue that this \ninconsistency must be resolved because a customer considering whether to take Interim \nNITS or NFCD transmission service needs to know whether curtailment before \npre-emergency demand response is a certainty or a possibility. \n547.\nAEU/SEIA contend that PJM has provided no information about the conditions \nthat would actually trigger curtailment of Interim NITS or NFCD transmission service in \npractice and that, because these are novel services, no historical curtailment data \n1074 Joint Co-Location Developers Response Brief at 17. \n1075 Constellation Response Brief at 29-30. \n1076 AEU/SETA Response Brief at 11. \n1077 Id. (citing PJM Initial Brief at 63-64). \n399 of 515"},{"page":109,"startToken":45650,"endToken":45998,"text":"Document Accessig.PSier; 2218-3Q9c\nurnent:Fhld PA99:6460A812Me Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 243 - \nexists.1078  AEU/SETA further argue that modeling of expected curtailment frequency and \nduration or examples of how curtailment would operate for a hypothetical Co-Location \nArrangement must be provided in order for customers to make informed business \ndecisions on the transmission service that best serves their needs. If it is not, AEU/SEIA \nargue that prospective customers will default to taking NITS. AEU/SEIA request that the \nCommission require PJM to develop and publish historical analysis and forward-looking \nmodeling of curtailment frequency and duration for Interim NITS and NFCD \ntransmission service, as informed by historical system conditions in PJM and broken \ndown by zone. AEU/SEIA also argue that PJM should set out in its reply brief how it \nintends to operationalize curtailment for NFCD transmission service, including the \nsequence in which Co-Located Loads will be curtailed relative to other non-firm services \nand the mechanism by which curtailment instructions will be communicated and \nenforced. Without this sequence, AEU/SEIA claim that neither the Commission nor \naffected parties can evaluate whether PJM's proposed curtailment framework is \nconsistent with the December Order's requirement that NFCD transmission service be \navailable \"as needed during normal, non-emergency system operating conditions.\"1°79 \n3. \nReply Briefs  \n548.\nEarthjustice argues that the Commission should require PJM to clarify how and \nwhen PJM will enforce its curtailment procedures, including: (1) how PJM will \ncommunicate its curtailment directives; (2) how and when transmission providers will \ndetermine that load shed is necessary, which loads will be curtailed first, and at what \nstage curtailments will occur; and (3) how a data center will be disqualified and the \ntimeline for that disqualification.1°8° \n549.\nIndustrials/Amtrak argue that many traditional large loads cannot shut off \nimmediately if their on-site generation trips.1°81 \n1°78  Id. at 12-14. \n1°79  Id. at 14 (quoting December Order, 193 FERC ¶ 61,217 at P 215). \n1080 Earthjustice Reply Brief at 14, 16. \n1°81  Industrials/Amtrak Reply Brief at 6. \n400 of 515"},{"page":110,"startToken":45998,"endToken":46411,"text":"Document AccessigiqSA 22Q2VA18_34Kurnent:Flild rPaN:6160A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 244 - \n4. \nAnswers \n550. Constellation argues that PJM inappropriately attempts in its reply brief to \nreinstate a curtailment criterion of a capacity/reserve shortage and that the Commission \nrejected this element of PJM's proposed Option 7 in the December Order.1°82 \n5. \nDetermination \n551. We find PJM's proposed curtailment hierarchy for Interim NITS, FCD \ntransmission service, and NFCD transmission service to be just and reasonable. PJM's \nproposal to treat FCD transmission service as comparable to NITS is consistent with the \nDecember Order,1°83  as is PJM's proposal to curtail Interim NITS and NFCD \ntransmission service prior to firm transmission services.1°84  In addition, we find PJM's \nproposal to curtail Interim NITS and NFCD transmission service prior to deployment of \nits Pre-Emergency Load Response Program, or in response to a transfer capability \nshortage as a result of system reliability conditions, to be just and reasonable because it is \nconsistent with how Non-Firm PTPS is curtailed.1°85  We disagree with Constellation that \nPJM's proposal to curtail Interim NITS during capacity or reserve shortages is \ninconsistent with the Commission's findings in the December Order that PJM's proposed \nconstruct for an interim transmission service was too broad and not sufficiently detailed \nto direct as a replacement rate.1°86  Constellation misunderstands the December Order, \nwhich found it was not reasonable to allow the transitional period for Interim NITS to \ncontinue until any resource adequacy challenges associated with the addition of the \nCo-Located Load were addressed, and instead limited the transitional period to the time \n1082  Constellation May 11 Answer at 13 (citing December Order, 193 FERC \n¶ 61,217 at P 202). \n1083 See, e.g., December Order, 193 FERC ¶ 61,217 at P 208 (stating that FCD \ntransmission service will have the same curtailment priority as existing firm transmission \nservices). \n1084  See, e.g., id. P 201 (stating that Interim NITS \"will be curtailed before existing \nfirm transmission services and the new Firm Contract Demand Transmission Service\"); \nid. P 215 (stating same with respect to NCFD transmission service). \n1085  See PJM, Intra-PJM Tariffs, OATT, § II, § 14.7 (Curtailment or Interruption of \nService) (0.0.0) (describing PJM's curtailment procedures for Non-Firm PTPS); RIM \nManual 13: Emergency Operations, Rev. 97 (eff. November 20, 2025), § 2.3.2. \n1086  Constellation May 11 Answer at 13 (citing December Order, 193 FERC \n¶ 61,217 at P 202). \n401 of 515"},{"page":111,"startToken":46411,"endToken":46840,"text":"Document Acc„sigiqP-; Z-C)72VA18-3ci@cUrnent:FlAd IgN9:6460/48/ 2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 245 - \nneeded to complete any Network Upgrades identified in the study process.1087  The \nCommission did not find, as Constellation alleges, that Interim NITS could not be \ncurtailed as a result of capacity or reserve shortages. Here, we find that PJM's proposal \nto curtail Interim NITS during capacity or reserve shortages is just and reasonable and \nconsistent with both the nature of the transmission service as a non-firm transmission \nservice for which Eligible Customers do not pay generation capacity charges, and the \nneed to maintain reliability. \n552.\nWe disagree with commenters that PJM must provide specific details in its Tariff, \nsuch as the trigger and procedures for curtailment of Interim NITS and FCD or NFCD \ntransmission services, or how PJM will enforce its curtailment procedures. We find that \nrequiring PJM to specify the curtailment priority of these new transmission services in its \nTariff, while leaving specific implementation details in its manuals and individual service \nagreements, provides transmission customers sufficient certainty as to their priority \nrelative to other transmission services and ensures that PJM has sufficient flexibility to \npreserve system reliability in varying operating conditions.1088  We find that it is just and \nreasonable and important to protect transmission system reliability to provide PJM with \nsufficient operational flexibility during emergency procedures to curtail transmission \ncustomers as needed to preserve reliability.1089 \n553.\nHowever, we find that PJM does not adequately explain its curtailment hierarchy \namongst non-firm transmission services. For example, while PJM states that it will \ncurtail Interim NITS and NFCD transmission service prior to deployment of its \nPre-Emergency Load Response Program, it does not detail if these transmission services \nwill be curtailed before or after Non-Firm PTPS, or if curtailment priority within NFCD \ntransmission service will be based on duration, as are curtailments for Non-Firm \npips .1090 \n1087 December Order, 193 FERC ¶ 61,217 at P 202. \n1088 See rum, \nr \nIntra-PJM Tariffs, OATT, § II.14.7 Curtailment or Interruption of \nService (0.0.0) (describing PJM's curtailment procedures for Non-Firm PTPS). \n1089 See Order No. 890-A, 121 FERC ¶ 61,297 at P 566 (\"If the [conditional firm \ntransmission] customer selects the annual hourly cap option, the transmission provider \nwill have the flexibility to conditionally curtail the customer for any reliability reason \nduring those hours, including but not limited to, the system condition(s) identified in the \nsystem impact study.\"). \n1090 PJM, Intra-PJM Tariffs, OATT, § II.14.7 Curtailment or Interruption of \nService (0.0.0). \n402 of 515"},{"page":112,"startToken":46840,"endToken":47286,"text":"Document Acc„sigiqW 2q-AQq18-346)cument:Flild IEN9:64EpA8/2pAte Filed 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 246 - \n554.\nWe also find that PJM has not justified its assertion that an Eligible Customer \ntaking different forms of transmission service on behalf of Co-Located Load would need \nto take those services on different feeders. PJM states that this requirement is based on \nthe need for core systems to be implemented to enable sufficient granularity when \nshedding an Eligible Customer's Co-Located Load being served by two different levels \nof transmission service.1091  While we recognize that core systems will need to be \nimplemented, PJM provides no explanation as to why these systems could not be \nsufficiently flexible as to accommodate a single feeder with two different levels of \ntransmission service on it. 1092 \n555.\nAccordingly, we direct PJM to submit, within 60 days of the date of issuance of \nthis order, a compliance filing to revise the Tariff to include the curtailment priorities for \nInterim NITS, FCD transmission service, and NFCD transmission service consistent with \nour findings above. This language must specify that FCD transmission service shall be \ntreated the same as NITS for the purposes of curtailment, and that Interim NITS and \nNFCD transmission service will be curtailed prior to deployment of PJM's Pre-\nEmergency Load Response Program, or in response to a transfer capability shortage as a \nresult of system reliability conditions. PJM's submittal must also detail the curtailment \npriorities between Non-Firm PTPS, Interim NITS, and NFCD transmission service, \nincluding how or if PJM will prioritize transmission customers for curtailment based on \nduration of service. Consistent with our determination above to extend the three new \ntransmission services set forth in the December Order to Eligible Customers taking \nservice on behalf of load with BTMG that are willing and able to limit their energy \nwithdrawals from the transmission system under certain conditions, we further direct \nPJM to reflect this change in its compliance filing. \nH. \nRates, Terms, and Conditions for Interim NITS \n1. \nInitial Briefs \n556.\nPJM proposes to model the non-rate terms and conditions for Interim NITS on \nNITS.1093  PJM proposes that an Eligible Customer may take Interim NITS on behalf of \nCo-Located Load until Network Upgrades are complete, and then the customer will \nautomatically convert to a Network Customer. PJM states that an Eligible Customer \nreceiving Interim NITS on behalf of Co-Located Load will receive non-firm transmission \n1091 PJM Initial Brief at 66. \n1092 For example, this system could assume that load on a feeder is firm up until \nthe Eligible Customer's Firm Contract Demand withdrawal limit, and non-firm above \nthat contract demand amount. \n1093 PJM Initial Brief at 67-70. \n403 of 515"},{"page":113,"startToken":47286,"endToken":47714,"text":"Document AccessigPSg AAgg-18-3PFicurnent:Fiald rFaINP:A0A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 247 - \nservice for the delivery of energy to Co-Located Load. PJM proposes that, upon receipt \nof request, PJM will determine the amount of Interim NITS that can be reliably provided \nbased on the results of appropriate studies and in consultation with the affected \ntransmission owner. PJM proposes that, for Interim NITS, the Eligible Customer must \nmeet certain conditions and appropriate technical requirements. PJM proposes that the \nEligible Customer have an ongoing obligation to notify PJM of material changes in the \ndemand characteristics of the Co-Located Load and the supply characteristics of the Co-\nLocated Generator. PJM explains that the Co-Location Arrangement cannot change \nduring the term of the Interim NITS without discussion and possible further studies by \nPJM. \n557.\nPJM proposes load shedding and curtailment provisions applicable to Interim \nNITS, including that prior to commencement of service, the Eligible Customer must \ndemonstrate its ability to comply with PJM's load shedding and curtailment \nprocedures.1094  PJM proposes to require Eligible Customers taking Interim NITS to work \nwith PJM and the affected transmission owners to establish necessary control \ntechnologies and/or protection systems. PJM proposes that Eligible Customers will be \nassessed certain non-transmission-related rates, including: (1) administrative service \ncharges, (2) ancillary services charges except for regulation, (3) black start service \ncharges based on gross demand, and (4) any redispatch costs. PJM proposes a single \nService Agreement specific to Eligible Customers serving Co-Located Load via Interim \nNITS or NITS. Indicated TOs propose to apply the NITS rate to Eligible Customers \ntaking Interim NITS.1095 \n2. \nResponse Briefs \n558.\nIndicated TOs propose several clarifications to PJM's illustrative Tariff \nprovisions.1096  First, Indicated TOs propose revisions to section 702.4 to require an \nEligible Customer to satisfy any applicable technical requirements imposed by the \nrelevant transmission owner. Second, Indicated TOs propose revisions to section 703.2 \nto clarify that both new and increased Co-Located Loads will be studied pursuant to a \nnew application for transmission service. Third, Indicated TOs contend that PJM should \nprovide additional information as to what would constitute a \"material change\" in the \ndemand characteristics of a Co-Located Load for purposes of an Eligible Customer's \nnotice obligations under section 703.3. Fourth, Indicated TOs recommend that PJM \nestablish load shedding practice guidelines applicable to Co-Location Arrangements for \npurposes of load shedding conducted under section 705.3 of PJM's illustrative tariff \n1094 Id at 71-75. \n1095 Indicated TOs Initial Brief at 5 n.13. \n1096 Indicated TOs Response Brief at 13-17, 23. \n404 of 515"},{"page":114,"startToken":47714,"endToken":48178,"text":"Document AccessigPsf; \n349Cument:Flit d rpaN: A0A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 248 - \nprovisions. Indicated TOs explain that they are particularly concerned with automatic \nload shedding schemes because of the possibility that unintentional activation of these \nschemes may result in unwanted shedding of nearby customer loads in addition to the \nCo-Located Load. Fifth, Indicated TOs propose revisions to section 705.5 to require that \nthe necessary control technologies and/or protection systems that must be approved by \nPJM are also approved by and developed in accordance with the transmission owners' \ninterconnection standards, guidelines, and practices. Sixth, Indicated TOs assert that the \nreference to the transmission owner's cost responsibility for redispatch costs in \nsection 706.2 of PJM's illustrative tariff provisions is incorrect and request that PJM \nremove such reference from the filed Tariff records. Seventh, Indicated TOs propose to \ncorrect a typo to the conditions of Part XI of the Tariff in section 2.0 of PJM's proposed \nAttachment F-3A. Last, Indicated TOs request that PJM add a placeholder section for \nlisting required control technologies and/or protection systems to section 4.0 of PJM's \nproposed Attachment F-3A. \n559.\nVistra argues that PJM's study process is flawed because it provides too much \ndiscretion to PJM and transmission owners to determine whether studies are required, \nwhich studies to conduct, the timeline for doing so, and how to prioritize different \nrequests.'°97  Also, Vistra contends that PJM's proposal is unclear on what it means to \nensure that non-firm transmission service can be provided reliably, and that it is critical \ncustomers seeking non-firm service not be held to some higher standard. Constellation \nsimilarly argues that PJM's proposed study procedures lack sufficient detail to prevent \ndelay and discrimination by transmission owners.\"'\" Constellation argues that PJM must \nspell out the studies it will perform in the tariff, as well as the timetable for completing \nthe studies. \n560.\nMarket Monitor argues that Interim NITS is not consistent with PJM's planning \nprocess and poses potentially significant reliability risks due to the complexity introduced \nby the necessary control technology and protection systems. Market Monitor states that \nthese risks mean there is not an unlimited amount of Interim NITS that can be provided, \nwhich raises questions about which customers would be allowed to take Interim NITS if \ndemand exceeds supply.1°99 \n561.\nSeveral parties oppose any restriction on Co-Located Loads accessing on-site \ngeneration while using Interim NITS and being curtailed, noting that PJM's initial brief is \nnot clear on whether such a requirement is being proposed. Parties argue that such a \nrequirement would be in violation of the December Order and significantly degrade the \n1097 Vistra Response Brief at 31, 39. \n1098 Constellation Response Brief at 14-15. \n1099 Market Monitor Response Brief at 6-7. \n405 of 515"},{"page":115,"startToken":48178,"endToken":48497,"text":"Document -AccessigPg q%2qq-18 _39pcument:FlAd  rjpaN:A0A812 pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 249 - \nvalue of Interim NITS.\"°°  DCC argues that allowing customers to be curtailed despite \nbringing their own generation does not align with the Commission's objective to enable \nmore flexible and timely service arrangements for Co-Located Load. \"°' DCC argues that \nPJM's proposal does not recognize an intermediate operational state in which Co-Located \nGenerators can operate in parallel with the grid on a limited, non-exporting or \nnon-market-participating basis while completing interconnection requirements. \nEnchanted Rock argues that because this limitation during curtailment conditions is a \npractice that affects rates and service significantly, that is reasonably susceptible of \nspecification, and that is not so generally understood in any contractual arrangement as to \nrender recitation superfluous, it must be included within the Tariff in order to be \neffectuated.11°2 \n562.\nAEU/SEIA request that the Commission direct PJM to revise its Interim NITS \nproposal to explicitly allow Eligible Customers to use on-site generation to serve load \ncontinuously, provided that the generator is new and that the Co-Located Load does not \nsimultaneously withdraw energy from the transmission system.11°3  Joint Co-Location \nDevelopers assert that, as long as Co-Located Generators are not capacity resources, they \nshould be free to serve Co-Located Loads during curtailment conditions.1104 \n563.\nConstellation asks the Commission to direct PJM to include a transitional \nmechanism for pending large load NITS applicants so that this new service is not \nunnecessarily limited to new applicants.1105 \n1100 See AEU/SEIA Response Brief at 20 (citing December Order, 193 FERC \n¶ 61,217 at P 201); Enchanted Rock Response Brief at 7; Joint Co-Location Developers \nResponse Brief at 18. \n1101 DCC Response Brief at 3-4. \n1102 Enchanted Rock Response Brief at 7. \n1103 AEU/SEIA Response Brief at 21. \n1104 Joint Co-Location Developers Response Brief at 19. \n1105 Constellation Response Brief at 14. \n406 of 515"},{"page":116,"startToken":48497,"endToken":48949,"text":"Document Acc„sigPSA:  2C5-\n1.8-3Q1Scument:FiAd rPa@g: A8/2 \ne Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 250 - \n3. \nReply Briefs \n564.\nIn consideration of parties' comments, particularly those of Indicated TOs, PJM \nproposes certain revisions to the illustrative tariff provisions for Interim NITS and NITS, \nand the Service Agreement for Interim NITS.11°6 \n565.\nPJM articulates several reasons why Interim NITS customers should not be \nallowed to access the Co-Located Generator when PJM curtails the Co-Located Load.11°7 \nFirst, PJM states that Interim NITS will be curtailed when the system cannot support it in \nreal time, whether with sufficient generation or transmission capacity. Second, PJM \nargues that Interim NITS must be designed to allow PJM to maintain system reliability, \nboth from a transmission and capacity perspective, and that allowing an interruptible \ncustomer to preclude PJM from accessing a generation resource during times of system \nstress would be contrary to that objective. PJM maintains that, if the Co-Located \nGenerator is a capacity resource, then PJM has the first call on such resource's energy to \nmeet the region's needs. Third, PJM explains that Interim NITS is a type of NITS and is \nserved by the pool of resources and not any one dedicated resource. PJM asserts that \nallowing an Interim NITS customer to take energy from the Co-Located Generator during \ncurtailment would effectively transform this service into something akin to FCD or \nNFCD transmission service, where the Co-Located Generator dedicates a MW level of \noutput to the Co-Located Load. Lastly, PJM argues that Interim NITS is predicated on \nthe Co-Located Load's willingness to curtail, and allowing an Interim NITS customer \naccess to the Co-Located Generator during times of system stress is contrary to this \nfoundational element of the December Order.11°8  PJM also asserts that providing a right \nto an Interim NITS customer to access the Co-Located Generator during times of system \nstress is illogical when such right is not available to full Network Customers. NOVEC \nurges the Commission to accept PJM's proposal and argues that if prospective customers \nfind that Interim NITS is not desirable, they have the flexibility to pursue a combination \nof FCD and NFCD transmission services.11°9 \n566.\nPJM defends its process for Interim NITS to determine whether \"additional studies \nare needed\" by arguing that the NITS study could provide sufficient information for PJM \nto determine if Interim NITS can be reliably provided.111°  PJM maintains that it should \n11°6  PJM Reply Brief at 60-64. \n11°7  Id. at 16-20. \nII\" Id. at 21 (citing December Order, 193 FERC ¶ 61,217 at P 201). \n11°9  NOVEC Reply Brief at 16. \n11°  PJM Reply Brief at 27. \n407 of 515"},{"page":117,"startToken":48949,"endToken":49328,"text":"Document AccessigaS\n 2A-AQA18-3489ument:FlAd rpaqg9: 6460,q8/24Ate  Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 251 - \nnot be required to provide as much detail for Interim NITS determinations as for FCD \nand NFCD transmission services given that Interim NITS is derivative of the customer's \nexisting NITS request and associated studies, although the illustrative tariff authorizes \nNM to perform additional studies if needed.\" \n567.\nJoint Co-Location Developers argues that the Interim NITS proposal undermines \nPJM's reliability rationale for NFCD transmission service outage restrictions because \nPJM has proposed to make it broadly available during normal operating conditions, and \nPJM has not claimed that doing so will compromise reliability.1112 \n568.\nConstellation avers that PJM's omission of any detail with respect to this study \nprocess does not comply with the Commission's directive to provide additional record \nevidence to set the appropriate replacement rates, terms, and conditions for Interim NITS \nand urges the Commission to direct PJM to file its study process for Interim NITS within \n30 days.1113 \n4. \nAnswers  \n569.\nConstellation asks the Commission to direct PJM to revise its illustrative tariff to \nclarify that large loads with pending NITS applications shall be studied for Interim NITS \nat the request of the load without having to submit a separate application.1114 \n570.\nEnchanted Rock reiterates that PJM's implementation of Interim NITS is \nfundamentally flawed because, while an Eligible Customer takes Interim NITS on behalf \nof a Co-Located Load, PJM proposes not to allow that Co-Located Load to receive any \ncapacity or energy from a Co-Located Generator and instead to treat the Co-Located \nGenerator as a capacity resource.1115  Enchanted Rock disagrees with PJM that this \nlimitation accords with the principles of the December Order that the new transmission \nservices are designed to serve loads that are willing and able to control their withdrawals \nfrom the transmission system and to allow PJM to maintain system reliability. Enchanted \nRock avers to the contrary that allowing a Co-Located Load to take capacity and energy \nfrom a Co-Located Generator enables that Co-Located Load to control its withdrawals \n1111  Id. at 31-32. \n1112  Joint Co-Location Developers Reply Brief at 9-10. \n1113  Constellation Reply Brief at 12. \n1114  Constellation May 11 Answer at 14. \n1115  Enchanted Rock May 7 Answer at 2-3. \n408 of 515"},{"page":118,"startToken":49328,"endToken":49779,"text":"Document AccessiggSg 4g1\"2-1§A18-3Q6)cument:Flild rg@iii:610)48/2p-Ate Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 252 - \nfrom the transmission system.116  Enchanted Rock also contends that PJM is mistaken in \nits argument that the PJM region has first call on the output of a Co-Located Generator \nbefore the Co-Located Generator has completed PJM's interconnection study process and \nreceived a GIA, because until that point, the Co-Located Generator is not eligible to be a \ncapacity resource. Enchanted Rock argues that forcing the Co-Located Generator to be \ndispatched under emergency conditions during this period would be unduly \ndiscriminatory by imposing on these Co-Located Generators obligations that are not \nimposed on similarly situated generators.1117  Finally, Enchanted Rock argues that it \nwould be illogical that an Interim NITS customer not be allowed to rely on its non-firm \nCo-Located Generator in order to remain online during emergencies when it is taking \nnon-firm transmission service. Enchanted Rock further contends that it would be unjust \nand unreasonable for a Co-Located Load to bear the full capital and development risk of \nbringing a Co-Located Generator online only for PJM to dispatch the Co-Located \nGenerator to serve firm Network Customers during emergencies—precisely when PJM is \nserving firm Network Customers but curtailing Interim NITS customers.1118 \n5. \nDetermination \n571. \nWe find PJM's proposal for Interim NITS to be just and reasonable, subject to the \nclarifications directed below, and direct PJM to file, as the replacement rate, rates, terms, \nand conditions for Interim NITS as detailed below on compliance. We generally agree \nwith PJM that the non-rate terms and conditions for Interim NITS reflect those applied to \nNITS, with necessary modifications to reflect the interim and non-firm nature of this new \ntransmission service. We find that PJM's proposals that an Eligible Customer taking \nInterim NITS will receive non-firm transmission service for the delivery of energy to \nCo-Located Load and convert automatically to a Network Customer when Network \nUpgrades are complete to be consistent with the directives in the December Order.1119 \nWe direct PJM to file, within 60 days of the date of issuance of this order, a compliance \nfiling revising its Tariff consistent with these findings. Consistent with our determination \nabove to extend the three new transmission services set forth in the December Order to \nEligible Customers taking service on behalf of load with BTMG that are willing and able \n1116  M at 5-6. \n1\"7  Id. at 6-8. \n1118  Id. at 8-9. \n\"18  December Order, 193 FERC ¶ 61,217 at P 200 (stating that Interim NITS \"can \nbe interrupted until the Network Upgrades necessary to provide NITS are complete and \nthe Co-Located Load can be designated as Network Load\"). \n409 of 515"},{"page":119,"startToken":49779,"endToken":50244,"text":"Document AccessigPc 22Q-A-1 8  _3I?pument:Flil d rj'Ag9: A110.8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 253 - \nto limit their energy withdrawals from the transmission system under certain conditions, \nwe further direct PJM to reflect this change in its compliance filing. \n572.\nWe find that Indicated TOs' proposal to apply the NITS rate to Eligible \nCustomers taking Interim NITS on behalf of Co-Located Load is just and reasonable and \nconsistent with the December Order.112°  Therefore, and consistent with our \ndetermination above to extend the three new transmission services set forth in the \nDecember Order to Eligible Customers taking service on behalf of load with BTMG that \nare willing and able to limit their energy withdrawals from the transmission system under \ncertain conditions, we direct the PJM transmission owners to submit, within 60 days of \nthe date of issuance of this order, a compliance filing to apply the NITS rate to Eligible \nCustomers taking transmission service on behalf of Eligible Loads. \n573.\nConsistent with our findings in Part VI.A.4, we also find just and reasonable \nPJM's proposal to charge Eligible Customers taking Interim NITS on behalf of \nCo-Located Load certain administrative and ancillary services charges, and to assess \ncharges based on gross demand for regulation and black start service. We find PJM's \nproposal consistent with the December Order.1121 Moreover, we find it is just and \nreasonable to charge Interim NITS customers redispatch costs to cover congestion-related \ncosts, given that Interim NITS will be pool-scheduled and can be served by generators \nredispatched to mitigate congested transmission paths. Accordingly, and consistent with \nour determination above to extend the three new transmission services set forth in the \nDecember Order to Eligible Customers taking service on behalf of load with BTMG that \nare willing and able to limit their energy withdrawals from the transmission system under \ncertain conditions, we direct PJM to submit, within 60 days of the date of issuance of this \norder, a compliance filing to incorporate in the Tariff revisions to assess to Eligible \nCustomers taking transmission service on behalf of Eligible Loads: (1) administrative \nservice charges, (2) ancillary service charges, (3) black start service charges, \n(4) regulation charges, and (5) any redispatch costs. \n574.\nWe note that only curtailment procedures were explicitly included in the paper \nhearing, and Tariff provisions governing other terms and conditions for Interim NITS, \nincluding the study process, should be filed on compliance.1122  That said, we find it is \njust and reasonable to allow PJM greater discretion as to how it studies Interim NITS \n1120  Id. (stating that Interim NITS customers would pay the NITS rate). \n1121 \n7.\n \nla (stating that Interim NITS customers would pay ancillary service charges \nand charges for black start service). \n\"22 m P 219. \n410 of 515"},{"page":120,"startToken":50244,"endToken":50736,"text":"Document AccessigPSP; 2A-Aggl.8-3R@cument:Flild rpAgp: ,A1A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 254 - \nrequests, in comparison to requests for FCD transmission service.1123  We disagree with \nVistra that PJM's proposed study process provides too much discretion to PJM and \ntransmission owners. We reiterate that Interim NITS is only \"available to the extent PJM \ndetermines that it can provide some level of interim service reliably,\"1124  and therefore \nwe find that it is just and reasonable to limit this service to situations in which PJM, in \nconsultation with transmission owners, grants such service based on the results of \nappropriate studies. The Commission generally defers to transmission providers' \ndiscretion regarding how to maintain a reliable transmission system.1125 \n575. We further find that Interim NITS is distinguishable from FCD and NFCD \ntransmission services, for which we direct PJM to provide additional detail in the Tariff \nregarding the study process as discussed Part VI.A.3, because Interim NITS is a \ntemporary service akin to provisional interconnection service in that both services are \nintended to allow a customer to temporarily use an amount of a service that can be \nprovided reliably until such customer may begin taking the full requested service. In \nboth cases, the Commission requires the transmission provider to determine if the \nrequested service could be provided reliably.1126 Similar to provisional interconnection \n1123  See PJM, Intra-PJM Tariffs, OATT, § VIII.L 439 Provisional Interconnection \nService (0.0.0) (providing that PJM \"may grant such service at its discretion based upon \nan evaluation that will consider the results of available studies\"); Order No. 890, \n118 FERC ¶ 61,119 at P 957 (in the case that a request for long-term Firm PTPS cannot \nbe satisfied out of existing capacity, the transmission provider is required to identify \noptions for providing service but has discretion to study and offer a mix of planning \nredispatch and conditional firm options for a single service request). \n1124  December Order, 193 FERC ¶ 61,217 at P 200. \n1125  RWE Clean Energy, LLC, 194 FERC ¶ 61,212 at P 42 (\"The Commission \ngenerally allows transmission providers to exercise their engineering judgment when \nconducting interconnection studies, including deferring to transmission providers' \ndiscretion regarding how to maintain a reliable transmission system.\"). \n1126  December Order, 193 FERC ¶ 61,217 at P 200 (\"Moreover, this new service \nwould be optional for an Eligible Customer seeking NITS on behalf of a Co-Located \nLoad and would only be available to the extent PJM determines that it can provide some \nlevel of interim service reliably.\"); Order No. 845, 163 FERC ¶ 61,043 at P 440 (\"In \nresponse to CAISO, we clarify that `a certain amount of capacity already studied' refers \nto situations where, for example, available studies or additional studies as necessary \nindicate that there is a certain amount of interconnection service available without the \nneed for additional network upgrades and the transmission provider can reliably \naccommodate the interconnection service.\"). \n411 of 515"},{"page":121,"startToken":50736,"endToken":51272,"text":"Document Acc„sigPSier; 4q\n218-3P8curnent:Filla rPaqg9:64613.812pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 255 - \nservice, we find that it is just and reasonable, in the case of this new interim transmission \nservice, to afford PJM greater discretion as to how it decides to study Interim NITS \nrequests, in comparison to requests for FCD and NFCD transmission services, and thus \nwe decline to direct PJM to provide more detail in its Tariff on the process for studying \nrequests for Interim NITS.1127  We also disagree with Constellation that it is necessary for \nPJM to study requests for Interim NITS as part of the NITS process, rather than pursuant \nto a separate application. On compliance, we direct PJM to file Tariff provisions to \neffectuate a study process for Interim NITS, as discussed herein. Consistent with our \ndetermination above to extend the three new transmission services set forth in the \nDecember Order to Eligible Customers taking service on behalf of load with BTMG that \nare willing and able to limit their energy withdrawals from the transmission system under \ncertain conditions, we further direct PJM to reflect this change in its compliance filing. \n576. Regarding requests from parties that Interim NITS customers be allowed access to \nthe Co-Located Generator during curtailments, we find that it is just and reasonable to \nprohibit the Eligible Customer taking Interim NITS on behalf of Co-Located Load from \ndrawing energy from the Co-Located Generator when the Eligible Customer is curtailed, \nif the Co-Located Generator is a capacity resource. As PJM explains, capacity resources \nhave an obligation to serve Network Load, and this obligation is particularly important \nduring emergency or pre-emergency conditions when PJM needs all resources at its \ndisposal to maintain reliability.1128  However, in response to parties, we clarify that such a \nrestriction would not be applicable to an Eligible Customer taking Interim NITS on \nbehalf of Co-Located Load if the associated Co-Located Generator does not yet have any \ninterconnection service or has only provisional interconnection service. Further, this \nrestriction applicable to an Eligible Customer taking Interim NITS on behalf of \nCo-Located Load would not be applicable if the associated Co-Located Generator is \nseeking capacity resource status, but not yet obtained such status, because that Co-\nLocated Generator would not yet have any obligation to provide capacity under the \n1127  See PJM, Intra-PJM Tariffs, OATT, § VIII.L 439 Provisional Interconnection \nService (0.0.0) (providing that PJM \"may grant such service at its discretion based upon \nan evaluation that will consider the results of available studies\"); RWE Clean Energy v. \nPJM Interconnection, L.L.C., 194 FERC ¶ 61,212 at P 42 (\"The Commission generally \nallows transmission providers to exercise their engineering judgment when conducting \ninterconnection studies, including deferring to transmission providers' discretion \nregarding how to maintain a reliable transmission system.\"); Order No. 890, 118 FERC \n1161,119 at P 957 (in the case that a request for long-term Firm PTPS cannot be satisfied \nout of existing capacity, the transmission provider is required to identify options for \nproviding service but has discretion to study and offer a mix of planning redispatch and \nconditional firm options for a single service request). \n1128 PJM Reply Brief at 18. \n412 of 515"},{"page":122,"startToken":51272,"endToken":51779,"text":"Document Acce„igP SA 2A -21Qq18-349cument:Flitd. EPAg:61/41A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 256 - \nTariff. We therefore direct PJM to submit, within 60 days, a compliance filing to \nincorporate the rates, terms, and conditions for Interim NITS that includes clarifications \nto specify that (1) an Eligible Customer taking Interim NITS on behalf of Co-Located \nLoad may be served by a Co-Located Generator that is seeking capacity resource status \nduring a curtailment condition to the extent that Co-Located Generator has yet to obtain \ninterconnection service or has only provisional interconnection service, and (2) an \nEligible Customer on behalf of Co-Located Load cannot expect to be served by a \nCo-Located Generator that is a capacity resource during a curtailment condition. \nConsistent with our determination above to extend the three new transmission services set \nforth in the December Order to Eligible Customers taking service on behalf of load with \nBTMG that are willing and able to limit their energy withdrawals from the transmission \nsystem under certain conditions, we further direct PJM to reflect this change in its \ncompliance filing. \n577.\nWe disagree with Market Monitor's arguments that Interim NITS is not consistent \nwith PJM's transmission planning process and poses potentially significant reliability \nrisks. As discussed above, we adopt PJM's proposal for application and studies for \nInterim NITS, which limits the amount of Interim NITS available to an Eligible Customer \nseeking to take Interim NITS on behalf of a Co-Located Load to the amount that PJM, in \nconsultation with the affected transmission owner(s), determines can be provided reliably \nto that customer while maintaining the reliability of the transmission system. \n578.\nWe decline to adopt Constellation's proposal to include a transitional mechanism \nfor pending NITS applications. PJM's proposal does not prohibit any NITS applicant \nfrom also applying for Interim NITS, provided the applicant pays the additional study fee \nand is subject to the technical requirements for Interim NITS. Therefore, we find such a \ntransitional mechanism not to be necessary. \nI. \nAnnual Report on New Transmission Services \n579.\nHaving addressed the rates, terms, and conditions for each of the new transmission \nservices (subject to additional compliance), we now turn to our ongoing oversight of the \nimplementation and use of these new transmission services. As discussed in the \nDecember Order and reiterated today, we expect that these new transmission services will \nfacilitate more efficient use of the existing transmission system and limit unnecessary \ntransmission system buildout. However, we also recognize that the new transmission \nservices represent new developments in the provision of transmission service in the PJM \nregion. These developments require effective oversight and monitoring to help ensure \nthe transmission services are working as intended and do not create reliability issues or \nraise novel questions regarding application of cost causation principles. Transparent \ninformation on the use of the new transmission services is also important for prospective \nEligible Customers on behalf of Eligible Loads to assess which transmission service to \nrequest and where on the transmission system to make such requests. We conclude that \n413 of 515"},{"page":123,"startToken":51779,"endToken":52099,"text":"Document Acceseiggtr; Z--216318-3[28.curnent:Flita rPaq99: A1A8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 257 - \nthe Commission, states, PJM market participants, and stakeholders would benefit from \nadditional transparency about these new transmission services, and we therefore direct \nPJM to prepare an annual report, posted to its website, containing information about the \ndemand for and use of these new transmission services. Accordingly, we direct PJM to \nsubmit, as part of its compliance filing within 60 days of the date of issuance of this \norder, proposed Tariff provisions requiring such a report and a proposal for the \ninformation to be included in that annual report. \n580. As PJM considers the scope and content of that annual report, we propose that the \nfollowing information could aid the Commission, states, PJM market participants, and \nstakeholders in assessing the impact of the new transmission services: \n1) Data regarding each transmission service request seeking each of the new services \nby transmission zone, including:1129 \na. Peak gross load of the Eligible Load \nb. Category of the Eligible Load \nc. Type and MW of transmission service being requested \nd. Type and MW of transmission service granted \ne. Dates of reservation and usage (for non-firm services) \n2) Total MW of each type of transmission service taken each year by transmission \nzone, including: \na. Total amount of FCD transmission service taken relative to peak gross load \nat the meter receiving FCD transmission service \nb. Total amount of NFCD transmission service taken relative to peak gross \nload at the meter receiving NFCD transmission service \nc. Total amount of Interim NITS relative to peak gross load at the meter \nreceiving Interim NITS \n1129  Some of the information we identify here is likely to be available on PJM's \nOpen Access Same-Time Information System. PJM may account for that availability in \ndesigning its proposal and addressing the potential burden associated with preparing the \nannual report. \n414 of 515"},{"page":124,"startToken":52099,"endToken":52445,"text":"Document AccessigRag 42 -VAI.13-349cument:Filla rPaqi19: 6161A 8/2PAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 258 - \n3) Information about transmission revenues paid by Eligible Customers on behalf of \nEligible Loads for each transmission service by transmission zone, including: \na. Total revenues paid by Eligible Customers taking each service per \ntransmission zone \nb. Percentage of each transmission owner's total revenue requirement paid via \nrevenues from each new service \nc. MWs of each new transmission service taken by Eligible Customers \nserving Eligible Loads as a percentage of peak gross load for each \ntransmission owner \n4) Frequency and magnitude of curtailment from the reservation of NFCD \ntransmission service and Interim NITS by transmission zone \n5) Frequency and magnitude of denials of NFCD transmission service reservation \nrequests by transmission zone \nJ. \nProposed Effective Date \n1. \nInitial Briefs  \n581.\nPJM proposes an effective date of June 1, 2029, for the three new transmission \nservices. PJM advances two rationales for its proposal: (1) integration of the new \ntransmission services into PJM's capacity market so that PJM can procure capacity for \nEligible Customers taking FCD transmission service on behalf of Co-Located Loads \ncannot occur until 2029; and (2) necessary modifications to the PJM core markets and \noperations software will take time.113°  PJM also argues that this effective date will not be \na limiting factor because Eligible Customers taking the new transmission services on \nbehalf of Co-Located Load and their Co-Located Generators likely will not be online \nbefore June 1, 2029, given interconnection requirements, supply chain issues, \nprocurement challenges, and capacity auction timelines.1131 \n582.\nAs to the capacity market, PJM argues that demand associated with Co-Located \nLoads will significantly affect PJM's load forecast and thus have significant implications \nfor the capacity market. PJM explains, however, that while the BRA for the 2028/2029 \ndelivery year (beginning June 1, 2028) has not taken place, the load forecast and eligible \n1130  PJM states this includes Real-Time Security Constrained Economic Dispatch, \nDay-Ahead Market, and dispatch software. PJM Initial Brief, Horger Aff. ¶ 16. \n1131  PJM Initial Brief at 79-82. \n415 of 515"},{"page":125,"startToken":52445,"endToken":52850,"text":"Document Access igiPP:: 22q-AgA18 _3Q@cument:Fl it d IpAg9:6451/6.8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 259 - \ncapacity have already been determined, and it is no longer possible to implement changes \nbefore the BRA is conducted. Therefore, according to PJM, the 2029/2030 delivery year \n(beginning June 1, 2029) is the first BRA in which the effects of the new transmission \nservices can be considered and PJM can procure capacity for Eligible Customers taking \nFCD transmission service on behalf of Co-Located Loads.1132 \n583.\nAs to the technical implementation issues, PJM argues that implementing the \nproposed curtailment priorities applicable to Interim NITS and NFCD transmission \nservice will require modifying PJM's economic dispatch software and dispatch tools in \norder to incorporate system automation that will avoid undesirable outcomes. PJM \nfurther contends that work cannot begin until the rates, terms, and conditions of these \nnew transmission services are finalized, and that changes to these systems will be \ndependent on vendor availability, the speed with which systems changes can be designed, \nand interaction with other software changes. 1133 \n2. \nResponse Briefs \n584.\nSome parties support PJM's proposed effective date. Market Monitor argues that \nall load in PJM currently is served by NITS, and that PJM has demonstrated that it must \nsignificantly modify core systems to address curtailing load where an Eligible Customer \ntakes more than one kind of transmission service on behalf of Co-Located Load.1134 \nNOVEC contends that entities other than PJM must also prepare for these new \ntransmission services by making operational adjustments and regulatory and billing \nchanges to ensure costs reflect cost causation principles.1135 \n585.\nConstellation, DCC, Joint Co-Location Developers, and Vistra oppose PJM's \nproposed effective date, and make a variety of arguments against PJM's rationales for it \nor in favor of alternative proposals for faster implementation.1136  As to arguments PJM \nmakes about the capacity market, Vistra contends that resource adequacy considerations \n1132  Id at 79-80 (citing Horger Aff. ¶¶ 11-13). PJM also argues that inclusion of \nthese services in Incremental Auctions would be inappropriate because they are \nconducted to procure replacement resources and generally result in small adjustments. \nId at 80-81 (citing Horger Aff. ¶ 15). \n1133  Id. at 81; Horger Aff. ¶ 16. \n1134  Market Monitor Response Brief at 8. \n1135  NOVEC Response Brief at 17-18. \n1136  Constellation Response Brief at 7; Joint Co-Location Developers Response \nBrief at 28; Vistra Response Brief at 8-9. \n416 of 515"},{"page":126,"startToken":52850,"endToken":53311,"text":"Document Accessig! iQ2Vg18-3Q9cument:Flild ,ja~ge: NA 8 12  PAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 260 - \nare beyond the scope of a transmission provider's obligation to serve and that the \nCommission requires transmission providers to make transmission service decisions \nbased on available transfer capacity.1137  Constellation, Joint Co-Location Developers, \nand Vistra each criticize PJM on the basis that Interim NITS and NFCD transmission \nservice are not capacity-backed services such that PJM need not procure capacity on their \nbehalf. Joint Co-Location Developers contend that PJM does not explain why a customer \ntaking NITS would be reflected in capacity market demand forecast but a customer \ntaking FCD transmission service would not. Similarly, Vistra argues that large loads \nwere already included in the load forecasts for the 2027/2028 and 2028/2029 BRAs and \nthat some of the new large loads in the forecasts may take the new transmission services. \nJoint Co-Location Developers argue that, if PJM's concerns stem from a planning need \nassociated with existing capacity resources de-registering, then PJM should propose a \ndelayed implementation limited to particular use cases. \n586.\nAs to PJM's technical implementation issues, Vistra and Joint Co-Location \nDevelopers criticize PJM for failing to offer any specificity.1138 Vistra alleges that \nprevious experience, such as in PJM's implementation of Order No. 841, suggests that \nPJM should be able to implement software changes much more quickly. Vistra further \ncharges that the Commission should demand more support to justify delaying \nimplementation than PJM has provided here, as it did in prior cases such as MISO's \nimplementation of Order No. 2222. Similarly, Joint Co-Location Developers argue that \ncurtailable products can be implemented on much faster timelines, pointing in particular \nto SPP's CHILLS and PJM's planned Connect and Manage proposal. Vistra also argues \nthat PJM's systems should already be capable of curtailing because its Tariff provides \nNon-Firm PTPS. Joint Co-Location Developers assert that PJM does not explain why \nadditional software must be developed for FCD transmission service, which is similar to \nNITS. Lastly, Joint Co-Location Developers state that their attached testimony notes that \nleveraging price responsive demand modifications to security constrained economic \ndispatch could allow PJM to implement faster any security constrained economic \ndispatch changes for non-firm loads. \n587.\nSeveral parties disagree with PJM that Co-Located Generators will not be online \nbefore June 1, 2029.\"39  Joint Co-Location Developers argue that there are likely to be \nprojects already in development that may opt to use these new transmission services. \n1137  Vistra Response Brief at 7 (citing, e.g., Order No. 890, 118 FERC ¶ 61,119 \nat P 2). \n1138  Id. at 10-12; Joint Co-Location Developers Response Brief at 29-30. \n1139  Joint Co-Location Developers Response Brief at 30; Vistra Response Brief \nat 9-10; Constellation Response Brief at 8. \n417 of 515"},{"page":127,"startToken":53311,"endToken":53757,"text":"Document AccessigOA:  4§.72-W_8-396)9 ument:FlAd tpa p: A1A8/2pge Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 261 - \nVistra adds that some generators are not capacity resources, are already in the process of \nde-listing, or could enter into a bilateral agreement with another generator to cover its \ncapacity obligation. Constellation points out that load co-locating with existing \ngeneration could take Interim NITS. \n588.\nSeveral parties request that the Commission make all or certain of the new \ntransmission services available earlier.114°  DCC argues that PJM has not demonstrated \nthat all elements of the proposed services must be deferred for several years, nor has it \nidentified opportunities for phased or interim implementation. DCC argues that the \nCommission should consider whether certain components of the framework can be \nimplemented on an accelerated or staged basis to provide near-term benefits while \nlonger-term systems are developed. Joint Co-Location Developers ask the Commission \nto require that FCD transmission service be available within six months of an order \naccepting PJM's filing and NFCD transmission service and Interim NITS be available at \nthe earliest date technically feasible. \n589.\nConstellation urges the Commission to establish a separate track to approve rates \nand terms for Interim NITS and make them effective no later than October 1, 2026.1141 \nConstellation argues that PJM offers no legitimate reason for proposing a \nthree-and-a-half-year delay and argues that it should not be difficult to adopt as soon as \npossible. Constellation maintains that, if the Commission separates and implements \nInterim NITS on a fast track, potential logistical challenges will not risk delay. \nConstellation suggests that the Commission review FCD and NFCD transmission \nservices on a separate track and urges the Commission not to delay them until June 2029. \nVistra proposes that, even if the Commission accepts PJM's software-based justifications, \nthe Commission should require PJM to immediately accommodate Co-Location \nArrangements for which software changes are irrelevant, such as where the Eligible \nCustomer does not reserve any amount of NFCD transmission service on behalf of \nCo-Located Load.1142  Vistra asserts that, whereas PJM contends that it needs software \nupgrades to apply appropriate curtailment priorities, a customer that reserves zero MWs \nof transmission service has no service to curtail. Vistra contends that it is not just and \nreasonable to prevent service on the basis of a software upgrade that is, at best, nominally \nrelevant to that service. Vistra maintains that delaying service to customers that pull no \nenergy from the grid is inconsistent with the December Order's goal to remedy PJM's \n1140 DCC Response Brief at 9; Joint Co-Location Developers Response Brief \nat 27-28. \n1141  Constellation Response Brief at 6-9. \n1142  Vistra Response Brief at 12-14. \n418 of 515"},{"page":128,"startToken":53757,"endToken":54168,"text":"Document AccessigPSA: 2A-2-Ytg518 - 34pcument.Filld rpAp:6161/48/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 262 - \nfailure to provide transmission service reflecting a Co-Located Load's willingness and \nability to limit withdrawals. \n3. \nReply Briefs  \n590.\nPJM asserts that NFCD transmission service is not easy to implement from an \noperations perspective, particularly at scale, and in addition to exposing the system to \nhigher reliability risks, will also require PJM to modify key systems.1143  PJM explains \nthat changes to Energy Management Systems are needed to ensure that PJM's systems \nare able to properly account for the provision of energy to Co-Located Load in the \nday-ahead and real-time market. PJM contends that its Energy Management System does \nnot currently distinguish between different types of load, and that feature must be added. \nPJM argues that it must determine how to properly model and reflect NFCD transmission \nservice and Co-Located Load in the different systems given that NFCD transmission \nservice requires the transmission system to operate on reduced contingency margins. \nPJM maintains that significant modifications to the market clearing engines used in both \nthe day-ahead and real-time markets will be required because PJM must be able to curtail \nNFCD transmission service with little to no advanced notification to respond to \nsignificant SOL/IROL exceedances. \n591.\nSeparate from systems updates, PJM argues that it will still be challenging from an \noperational perspective to provide NFCD transmission service.1144  PJM explains that its \nsystems must not only accurately reflect how this new service affects the transmission \nsystem, but PJM must also account for this service in the Operating Plans and then \nimplement those plans manually when needed in real time. PJM argues that, because the \ntransmission system is not designed to accommodate NFCD transmission service, it will \nlikely trigger many more SOL/IROL exceedances for PJM to mitigate in the Operating \nPlan and require operations at or near operating limits, rendering the system less flexible \nto respond to unexpected changes during operations. PJM contends that it will be \nimperative that loads taking NFCD transmission service can be removed from the system \nas soon as possible when needed. \n592.\nPJM claims it will need additional tariff language and manuals to operationalize \nrequests for service.1145  PJM asserts that it reserves the right to further supplement the \nrecord in this proceeding if and when it develops such tariff language. \n1143  PJM Reply Brief at 13-14. \n1144  /Ci. at 14-15. \n1145  Id. at 16. \n419 of 515"},{"page":129,"startToken":54168,"endToken":54568,"text":"Documerit AccesSigisp;\nument:F~l~d1j \nFiled: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 263 - \n593.\nPJM clarifies that June 1, 2029, is the effective date for providing the new \ntransmission services and that, once the Commission establishes the terms and conditions \nfor these new services, PJM is willing to start accepting service requests and processing \nservice applications.1146  PJM states its intent to get a headstart on establishing the details \nas to how it would implement the illustrative tariff by soon commencing discussions with \nstakeholders regarding implementation details, to be stated in PJM manuals, for these \nnew transmission services. PJM contends that, with these clarifications, there is no need \nto establish a transition mechanism for pending NITS applications, as Constellation \nsuggests. In response to concerns that PJM failed to provide a specific timeline for \nsoftware development, PJM contends that it cannot determine a more exact development \nschedule at this time because these are new transmission services. \n594.\nSome commenters continue to support PJM's proposed effective date.1147  Other \ncommenters continue to criticize PJM's proposed effective date. Joint Co-Location \nDevelopers argue that it is unclear why PJM must delay implementation until 2029, given \nthat ERCOT has committed to implementation of controllable load as soon as 2027.1148 \nJoint Co-Location Developers further argue that PJM has provided no reason why its \nsystem uniquely requires a longer implementation process compared to other RTOs, and \nthat PJM is well placed to implement changes to its security constrained economic \ndispatch given the existing capability of its nodal Price Responsive Demand \nimplementation. \n595.\nConstellation argues that PJM's proposed effective date would impose a three- to \nfive-year moratorium on Co-Location Arrangements and undermines the December \nOrder by allowing rates found to be unjust and unreasonable to remain in place for \nyears.1' 49  Constellation asserts that PJM has devoted significant resources to such \nchanges and has the tools to implement new rules quickly. Constellation urges the \nCommission to promptly approve the rates and terms for Interim NITS, including the \nstudy process, by no later than October 1, 2026. \n1146  Id at 55-57. \n1147  NOVEC Reply Brief at 27; Earthjustice Reply Brief at 19. \n1148  Joint Co-Location Developers Reply Brief, Supp. Aff. of Andrew Levitt and \nAniruddh Mohan at 10 (citing ERCOT Large Load Interconnection Batch Study \nWorkshop #7 at 25 (April 9, 2026), ERCOT-Large-Load-Batch-Study-Workshop7-\n20260409 v03.pptx). \n\" \nConstellation Reply Brief at 3-5. \n420 of 515"},{"page":130,"startToken":54568,"endToken":55010,"text":"Document Accessigt@Sg 2A-Ags18-34@cument:FlA d IFAv: g/118/2L Ate Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 264 - \n4. \nAnswer \n596. Constellation opposes PJM's requested effective date and points out that PJM \nseeks to begin Connect and Manage July 1, 2027, to allow the interconnection of \nnon-capacity-backed loads that are potentially interruptible during capacity shortages, \nunless the load brings its own generation.11\" Constellation contends that it is not credible \nthat PJM will take more than three years to implement Interim NITS, but less than one \nyear to commence Connect and Manage.1151  Constellation asks the Commission to make \nInterim NITS effective no later than October 1, 2026, so that service can begin no later \nthan June 1, 2027. \n5. \nDetermination \n597. \nWe find that PJM has not provided sufficient information for the Commission to \nfind that its proposed June 1, 2029, effective date is just and reasonable. We are \nconcerned that the proposed June 1, 2029, effective date unduly delays the availability of \nthe new transmission services, particularly those where PJM does not procure generation \ncapacity for Eligible Customers taking the transmission service on behalf of Eligible \nLoad, i.e., Interim NITS and NFCD transmission service. As discussed above, while \nPJM will procure generation capacity in forward capacity auctions to serve Eligible \nCustomers taking FCD transmission service based on the contract demand level, PJM \nwill not consider Interim NITS or NFCD transmission service in its resource adequacy \nplanning. Further, we agree with Vistra and Joint Co-Location Developers that PJM's \nproposal lacks specificity. In particular, we find that the implementation details for the \nsoftware updates necessary for PJM's economic dispatch software and dispatch tools lack \nspecificity. Though PJM states that it cannot determine \"a more exact development \nschedule\" for software development,1152  the Commission generally requires more support \nfor the timeliness of a proposed effective date.1153  We believe that the instant order \nprovides PJM further clarity. We note that June 1, 2029, is approximately three years \nfrom now, and the issues raised by this proceeding, including those pertaining to \nCo-Located Load, are urgent in nature and, therefore, merit serious consideration of an \nearlier effective date. Therefore, we direct PJM to reconsider its proposed effective date \nof June 1, 2029. Moreover, we direct PJM to make a compliance filing, due within \n60 days of the date of issuance of this order, in which PJM must explain whether it can \n1150 Constellation May 11 Answer at 2. \n1151 Id. at 3. \n1152 PJM Reply Brief at 57. \n1153  See, e.g., Midcontinent Indep. Sys. Operator, Inc., 190 FERC 1161,031, \nat P 163 & n.302 (2025). \n421 of 515"},{"page":131,"startToken":55010,"endToken":55308,"text":"Dobument Accessigf Sie,:: 22Woftql8-3R99PMent:Filtd IPA9:616-7q8/2P-Ae Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 265 - \nmake the new transmission services available on different effective dates. In the \ncompliance filing, PJM should specifically discuss whether Interim NITS and NFCD \ntransmission service can be made effective at an earlier date for Eligible Customers \ntaking transmission service on behalf of Eligible Loads. \nK. \nAdditional Arguments  \n1. \nBehind the Meter Generation \na. \nReply Briefs  \n598.\nIndustrials/Amtrak argue that the Commission should take the following actions: \n(1) set a realistic retail BTMG threshold to focus new Co-Located Load rules on \n\"gridbusting\" growth above 200-300 MW, not on existing industrial customers (e.g., \nconsumer goods manufacturers, steel mills, chemical manufacturers, paper mills, and \npharmaceutical factories); (2) qualify all QFs for retail BTMG treatment without a date \nlimit, consistent with PURPA regulations; (3) set clear grandfathering rules to enable \nexisting, established users to avoid intensive PJM study queues, study deposits, and \nprocesses for operations that continue to function properly.1154 \n599.\nPJM argues that certain parties raise issues beyond the scope of this proceeding. \nPJM contends that Industrials/Amtrak improperly ask the Commission to examine \nBTMG.1155 \nb. \nDetermination \n600. Industrials/Amtrak raise issues with respect to PJM's retail BTMG netting rules \nthat we address in PJM's second compliance filing above.1156 \n2. \nReliability Backstop Auction \na. \nReply Briefs  \n601. Maryland OPC asserts that PJM's proposed terms and conditions do not explain \nhow existing capacity resources that shift to Co-Location Arrangements with new data \ncenters would be treated relative to the PJM's proposed reliability backstop procurement \n(RBP). For example, Maryland OPC states that it is unclear whether capacity from \n1154  Industrials/Amtrak Reply Brief at 15. \n1155 PJM Reply Brief at 58-59. \n1156  See supra Part V.A. \n422 of 515"},{"page":132,"startToken":55308,"endToken":55727,"text":"Document AccesSi \n2-Ag1.8-39@cument:Fi il d  aqii:61g4812ppe Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 266 - \nexisting generators that remove themselves from the capacity market and enter \nCo-Location Arrangements with new data center load would need to be replaced with \nnew capacity through the RBP or in the regular BRA, and whether new data center load \nthat co-locates with an existing generator will be included in the cost allocation of the \nRBP 115'  Maryland OPC states that if the capacity of existing generation that shifts to \nserve new co-located data center load is added to the BRA, ratepayers would be saddled \nwith enormous costs that should be assigned to the Co-Located Load, in contravention of \nthe White House and PJM Governors' Statement of Principles and the White House's \nRatepayer Protection Pledge. Maryland OPC requests that the Commission at minimum \nrequire PJM demonstrate how its proposal meets ratepayer protection standards set forth \nin the Statement of Principles and Ratepayer Protection Pledge and defer action on the \nproposed revisions until after PJM proposes tariff revisions to implement its RBP. \nMaryland OPC also raises concern that PJM's initial brief suggests PJM does not intend \nfor existing load to be eligible for the new transmission services.I158 \nb. \nDetermination \n602. As an initial matter, we clarify that, contrary to Maryland OPC's concern, PJM's \npaper hearing proposal does not restrict Eligible Customers on behalf of existing \nCo-Located Load from taking the new transmission services. We decline Maryland \nOPC's request to defer action. Maryland OPC expresses concern that PJM's paper \nhearing proposal does not address how existing capacity resources that seek to serve \nCo-Located Loads would be treated relative to a potential future filing by PJM to address \nits reliability backstop mechanism. We find that Maryland OPC's concerns about PJM's \ncapacity market are beyond the scope of this paper hearing, which addresses the rates, \nterms, and conditions for new transmission services for Eligible Customers to take on \nbehalf of Eligible Loads.1159 \n1157  Maryland OPC Reply Brief at 9-11. \n1158  Id. at 8 (noting PJM's explanation that it is unlikely that new generation will \nbe operational before its proposed June 1, 2029 effective date). \n1159  In recognition of the goal to prevent unfair cost shifts, we also note that as part \nof the President's Ratepayer Protection Pledge, a number of computational loads have \ncommitted to paying for \"all new power delivery infrastructure upgrades to service their \ndata centers.\" Proclamation No. 11014, 91 Fed. Reg. 11439 (Mar. 4, 2026). \n423 of 515"},{"page":133,"startToken":55727,"endToken":56111,"text":"Document Accessig SA 2A-g64-,1 8  _ 3Q gg ument :F \nd rpaN9: gfli8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 267 - \n3. \nEligible Customer Requirements \na. \nResponse Briefs \n603. Invenergy requests that the Commission and PJM clarify how the definition of \nEligible Customer applies to Co-Located Generators and Co-Located Loads.116° \nInvenergy explains that, where a state retail choice program results in unbundled retail \naccess, customers may take transmission service as an Eligible Customer, and that \ntherefore, Invenergy believes that a Co-Located Load could qualify as an Eligible \nCustomer in a retail choice jurisdiction.1161  Invenergy seeks clarity as to whether, in the \ncontext of a Co-Location Arrangement, a Co-Located Generator qualifies as an Eligible \nCustomer on behalf of the Co-Located Load, and whether that Co-Located Generator's \nstatus as an Eligible Customer depends on whether the Co-Location Arrangement is in a \nretail choice jurisdiction. \nb. \nReply Briefs  \n604.\nNOVEC argues that the Commission should consider a more definitive delineation \nof who may be an Eligible Customer as well as the scope of the Eligible Customer's \nobligations. Specifically, NOVEC seeks confirmation that it cannot be required to serve \nas an Eligible Customer serving Co-Located Load unless it agrees to do so.1162 \n605.\nNOVEC argues that the Commission cannot require LSEs to modify their retail \nrates to accommodate these new services and undertake the administrative burden of \nbeing an Eligible Customer for a Co-Located Load unless the LSE chooses to do so. \nFurther, NOVEC contends that it should not be subject to potential liability for the \ntransmission costs, much less penalties for non-compliance with the Tariff's \nrequirements, if a Co-Located Load for which NOVEC is serving as Eligible Customer \nfails to meet or comply with all applicable provisions.1163 \n606.\nIndicated TOs express support for PJM's decision to retain the existing definition \nof Eligible Customer. In response to Invenergy's request for clarification as to how that \ndefinition applies to Co-Located Generators and Co-Located Loads, Indicated TOs argue \nthat it will depend on an individual Co-Located Generator's specific factual \ncircumstances. Indicated TOs contend that a Co-Located Generator is unlikely to meet \n\" 6°  Invenergy Comments at 6. \n1161 Id. (citing Order No. 888, FERC Stats. & Regs. ¶ 31,036 at 31,689). \n1162  NOVEC Reply Brief at 5. \n1163  Id. at 7. \n424 of 515"},{"page":134,"startToken":56111,"endToken":56499,"text":"Document AccessigPA 12.16R-18-3499ument:FlAd rFaIN9:61A8/2psite Filed: 10/16/2025 \nDocket No. EL25-49-002, et al. \n- 268 - \nthe definition of an Eligible Customer for purposes of obtaining FCD or NFCD \ntransmission service because it is more likely to sell its output directly to the on-site load \nat retail. Indicated TOs further contend that the ability of Co-Located Load or an entity \nrepresenting the load to qualify as an Eligible Customer would necessarily depend on \nwhether its host jurisdiction has adopted retail choice.1164 \nc. \nDetermination \n607.\nWith respect to Invenergy's request, we note the Tariff defines an Eligible \nCustomer as (1) any electric utility or any person generating electric energy for sale for \nresale, but with respect to transmission service that the Commission is prohibited from \nordering by section 212(h) of the FPA, such entity is eligible only if the service is \nprovided pursuant to a state requirement that the Transmission Provider or Transmission \nOwner offer the unbundled transmission service, or pursuant to a voluntary offer of such \nservice by a Transmission Owner or (2) any retail customer taking unbundled \ntransmission service pursuant to a state requirement that the Transmission Provider or a \nTransmission Owner offer the transmission service, or pursuant to a voluntary offer of \nsuch service by a Transmission Owner.1165  A Co-Located Generator may serve as an \nEligible Customer if it meets the requirements of this definition of Eligible Customer. \n608.\nWe also clarify that nothing in this order or the December Order requires LSEs to \nmodify their retail rates to accommodate the new transmission services. We require PJM, \nas the transmission provider, to offer these services, but we do not require LSEs to offer \nthem to their retail customers. In other words, we do not require any LSE to become an \nEligible Customer taking one of the new transmission services on behalf of an Eligible \nLoad. \n4. \nDemand Side Pathways  \na. \nResponse Briefs \n609.\nAlliance supports converting Options 7 and 8 from PJM's March 2025 Answer \ninto enforceable tariff language. Alliance supports strong measurement and verification \nof load reductions from demand response and energy efficiency in order to implement \nOptions 7 and 8.1166 \n1164  Indicated TOs Reply Brief at 6-7. \n1165  PJM, Intra-PJM Tariffs, OATT, § I.1 Definitions — E-F (41.0.0). \n1166  Alliance Response Brief at 5-6. \n425 of 515"},{"page":135,"startToken":56499,"endToken":56848,"text":"Document AccessigiV: 2gl'Agg18-31:29.curnent:Fhld rPA99: _\n8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 269 - \nb. \nDetermination \n610. Alliance's comments are essentially an untimely request for rehearing of the \nDecember Order. Alliance overlooks that the December Order required PJM to create a \nnew interim non-firm transmission service similar to PJM's Option 7. As part of our \ndeterminations with respect to the rates, terms, and conditions for Interim NITS, we are \ndirecting PJM to submit a compliance filing to revise its Tariff to implement this new \ntransmission service. As for PJM's Option 8, wherein Co-Located Load that is Network \nLoad may participate as a demand response resource, the Commission in the December \nOrder did not direct any changes to PJM's demand response rules. We reiterate, as the \nCommission explained in the December Order, there is not sufficient evidence to \nconclude that the existing Tariff is not just and reasonable as it relates to the existing \ndemand response rules.1167  Co-Located Loads that elect to be Network Load may \nparticipate as a demand response resource under PJM's existing Tariff to the extent that \nthey meet the requirements to participate as such. \n5. \nInterconnection \na. \nResponse Briefs  \n611. AEU/SEIA claim that PJM proposes to require all co-located generators to \nundergo full interconnection studies, including those that have no intention of exporting \npower to the transmission system.I168  AEU/SEIA argue that PJM indisputably requires \nsufficient information about proposed co-located generators to reliably plan and operate \nthe transmission system, but that subjecting non-exporting facilities to full \ninterconnection studies will impose costs, delays, and administrative burden that are \ndisproportionate to the reliability benefits that are achieved. AEU/SEIA further argue \nthat this would further strain the interconnection queue to the detriment of the PJM region \nand its customers. \nb. \nReply Briefs  \n612. PJM argues that AEU/SEIA improperly assert that PJM should not study all \ninterconnecting generators.\"\" \n1167  December Order, 193 FERC ¶ 61,217 at P 242. \n1168  AEU/SEIA Response Brief at 15-16 (citing PJM Initial Brief at 82). \n1169  PJM Reply Brief at 58. \n426 of 515"},{"page":136,"startToken":56848,"endToken":57236,"text":"Document AccessigPV; 2A-A418-3Q6cument:Flita \ng 6W8/2 ?Ate Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 270 - \nc. \nDetermination \n613.\nWe find that AEU/SEIA's concerns about interconnection studies for Co-Located \nGenerators are beyond the scope of this paper hearing, which concerns the rates, terms, \nand conditions of new transmission services that Eligible Customers may take on behalf \nof Eligible Loads. However, we note that the Commission has approved PJM's proposal \nto comply with the directives of the December Order that, for Interconnection Customers \nseeking to use new generators to serve Co-Located Load: PJM will consider requests for \ninterconnection service below the full generating capability of the generator, and such \nInterconnection Customers may use existing procedures to accelerate a new service \nrequest if they satisfy the criteria of the Tariff.1170 \n6. \nCo-Location Arrangement with Electric Storage Resource \na. \nResponse Brief \n614.\nJoint Co-Location Developers ask that PJM clarify that its transmission service \nrequirements for electric storage charging apply to storage co-located with load, and \nexempt customers from the Maximum Facility Output where the customer's load shape \nand characteristics are inherently flexible.1171  Joint Co-Location Developers state that \nPJM does not require electric storage resources to take transmission service for charging, \nexcept where the storage charges during the zonal peak hour without being dispatched. \nJoint Co-Location Developers claim that, in the context of PJM's proposal to limit NFCD \ntransmission service to 100% of the Maximum Facility Output of the Co-Located \nGenerator, PJM appears to allow the relevant Co-Located Load to take service while the \nco-located electric storage resource charges. Joint Co-Location Developers maintain that \nPJM should clarify this point in its Tariff to avoid any implication that this activity is \nprohibited. Joint Co-Location Developers request that PJM clarify that co-located \ncharging loads, like standalone electric storage resources, do not require transmission \nservice unless they charge during the zonal peak hour without being dispatched, and that \nany withdrawals for electric storage charging at the Point of Interconnection for which \ntransmission service is not required do not count toward the Maximum Facility Output. \nJoint Co-Location Developers request, in the alternative, that PJM remove the Maximum \nFacility Output limit for loads co-located with electric storage resources. \n117°  PJM Interconnection, L.L.C., 195 FERC ¶ 61,030 at P 25. \n1171  Joint Co-Location Developers Response Brief at 13-14. \n427 of 515"},{"page":137,"startToken":57236,"endToken":57612,"text":"Document AccessigIir; A-2-YCZZ18-3R9c ument:Fht d ripAg: 64(gEi8/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 271 - \nb. \nReply Brief \n615. PJM argues Joint Co-Location Developers improperly ask the Commission to \nexamine transmission service for charging electric storage resources.1172 \nc. \nDetermination \n616. To the extent Joint Co-Location Developers ask the Commission to address \ntransmission service for electric storage resources, such request is beyond the scope of \nthis paper hearing, which concerns the rates, terms, and conditions of new transmission \nservices for Eligible Customers on behalf of Eligible Loads. However, insofar as Joint \nCo-Location Developers raise concerns about PJM's proposed requirement that an \nEligible Customer electing to take NFCD transmission service \"must apply for [NFCD \ntransmission service] equivalent to the megawatt level of the Co-Located Generating \nFacility dedicated to serving the Co-Located Load,\" which Joint Co-Location Developers \nrefer to as the Maximum Facility Output limit, we reject PJM's proposal above.1173 \nThe Commission orders: \n(A)\nIn response to the requests for rehearing, the December Order is hereby \nmodified and set aside, in part, as discussed in the body of this order. \n(B)\nThe clarification requests are hereby denied in part and granted in part, as \ndiscussed in the body of this order. \n(C)\nPJM is hereby directed to submit, within 60 days of the date of issuance of \nthis order, a compliance filing with revisions to its Tariff as described in Part IV.B.3. \n(D)\nPJM is hereby directed to submit, within 60 days of the date of issuance of \nthis order, a compliance filing with revisions to its Tariff as described in Part IV.C.1.b.i. \n(E)\nPJM is hereby directed to submit, within 60 days of the date of issuance of \nthis order, a compliance filing with revisions to its Tariff as described in Part IV.C.1.c.i. \n(F)\nPJM is hereby directed to submit, within 60 days of the date of issuance of \nthis order, a compliance filing as described in Part V. \n(G)\nPJM is hereby directed to submit, within 60 days of the date of issuance of \nthis order, a compliance filing as described in Part VI. \n1172 PJM Reply Brief at 59. \n1173  See supra Part VI.A.2. \n428 of 515"},{"page":138,"startToken":57612,"endToken":57682,"text":"Document AccessigPsA: 2.2q-Agiq18 _31?gument:Flit d rpAg: Agq. 81, pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 272 - \n(H) \nPJM transmission owners are hereby directed to submit, within 60 days of \nthe date of issuance of this order, a compliance filing as described in Part VI. \nBy the Commission. Commissioner Chang is concurring with a separate statement \nattached. \n(SEAL) \nDebbie-Anne A. Reese, \nSecretary. \n429 of 515"},{"page":139,"startToken":57682,"endToken":57935,"text":"Document AccessigPSA: 2AActg-18  _ 3Q9cu men tFl it d rpAg9: d163/C1812 pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 273 - \nAppendix — Tariff Record[s] \nPJM Interconnection, L.L.C. \nIntra-PJM Tariffs \n•\nA-B, OATT Definitions -- A - B (24.0.0)  \n•\nL-M-N, OATT Definitions -- L \nM - N (52.0.0)  \n•\n28.1. OATT 28.1 Scope of Service: (2.0.0)  \n•\n29.1, OATT 29.1 Condition Precedent for Receiving Service (4.0.0)  \n•\n29.2, OATT 29.2 Application Procedures: (4.0.0)  \n•\n31.6. OATT 31.6 Annual Load and Resource Information Updates: (4.0.0)  \n•\n34.2, OATT 34.2 Netting of Behind the Meter Generation. (1.0.0)  \n•\n34.3, GATT 34.3 Netting of Non-Retail Behind The Meter Generation (2.0.0) \n•\n300 B, OATT 300 Definitions B (2.0.0)  \n•\n300 N, OATT 300 Definitions N (3.0.0)  \n•\n400 B, OATT 400 Definitions B (2.0.0)  \n•\n400 N, OATT 400 Definitions N (4.0.0)  \n•\n401, OATT Part VIII.A 401 Applications for Cycle Process Intro (5.0.0)  \n•\n403, OATT Part VIILB 403 Application Rules (4.0.0)  \n•\nIX Subpart A, OATT Part IX Subpart A FORM OF APPLICATION AND  \nSTUDIES AGRMT (4.0.0)  \n•\nIX.B GIA Appx-Sched, OATT Part IX.B GIA Appendices and Schedules (5.0.0) \n•\nIX.B GIA Schedule O. OATT Part IX.B GIA Schedule O (0.0.0)  \n•\nIX Subpart G, OATT Part IX Subpart G FORM OF NECESSARY STUDIES  \nAGREEMENT (3.0.0)  \n430 of 515"},{"page":140,"startToken":57935,"endToken":57985,"text":"Document AccessigRW 2A1§A18-3Q9cLIMent:Filtd \nA3,11.s/2pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 274 - \n•\nXL OATT XI. TRANSMISSION SERVICES FOR CO LOCATED LOADS  \n(0.0.0) \n•\nATTACHMENT F-3A, OATT ATTACHMENT F-3A (0.0.0)  \n•\nATTACHMENT F-4, OATT ATTACHMENT F-4 (0.0.0)  \n431 of 515"},{"page":141,"startToken":57985,"endToken":58177,"text":"Doaufnerit Accessigi SP 2Q12-YZA18-3Q0cUMent:Filtd Dijag9:6t3/4812pAte Filed: 10/16/2026 \nUNITED STATES OF AMERICA \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C. \nDocket Nos. EL25-49-002 \nAllegheny Electric Cooperative, Inc. \nEL25-49-000 \nAmerican Transmission Systems, Incorporated \nAtlantic City Electric Company \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc. \nDuke Energy Kentucky, Inc. \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC \nJersey Central Power & Light Company \nMid-Atlantic Interstate Transmission, LLC \nNeptune Regional Transmission System, LLC \nOld Dominion Electric Cooperative \nPECO Energy Company \nPPL Electric Utilities Corporation \nPotomac Electric Power Company \nPublic Service Electric and Gas Company \nRockland Electric Company \nTrans-Allegheny Interstate Line Company \nTransource West Virginia, LLC \nUGI Utilities, Inc. \nMonongahela Power Company \nThe Potomac Edison Company \nCommonwealth Edison Company \nCommonwealth Edison Company of Indiana, Inc. \nThe Dayton Power and Light Company \nAEP Appalachian Transmission Company, Inc. \nAEP Indiana Michigan Transmission Company, Inc. \nAEP Kentucky Transmission Company, Inc. \nAEP Ohio Transmission Company, Inc. \nAEP West Virginia Transmission Company, Inc. \nAppalachian Power Company \nIndiana Michigan Power Company \nKentucky Power Company \nKingsport Power Company \nOhio Power Company \nWheeling Power Company \n432 of 515"},{"page":142,"startToken":58177,"endToken":58422,"text":"Document AccessigPsA: 2.2q-AqA18 _31:?@cument:Fhl d  d'g9:A3A812pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 2 \nDuquesne Light Company \nVirginia Electric and Power Company \nLinden VFT, LLC \nCity of Cleveland, Department of Public Utilities, \nDivision of Cleveland Public Power \nCity of Hamilton, OH \nSouthern Maryland Electric Cooperative, Inc. \nOhio Valley Electric Corporation \nAMP Transmission, LLC \nSilver Run Electric, LLC \nNextEra Energy Transmission MidAtlantic Indiana, Inc. \nWabash Valley Power Association, Inc. \nKeystone Appalachian Transmission Company \nLarge Loads Co-Located at Generating Facilities \nAD24-11-001 \nConstellation Energy Generation, LLC \nEL25-20-001 \n(consolidated) \nv. \nPJM Interconnection, L.L.C. \nPJM Interconnection, L.L.C. \nER26-1479-000 \n(Issued June 18, 2026) \nCHANG, Commissioner, concurring: \n1.\nIn today's order, the Commission addresses rehearing requests and the paper \nhearing and compliance record regarding the rates, terms, and conditions through which \nCo-Located Loads may take transmission service from the PJM Interconnection, L.L.C. \n(PJM) system. I write separately to address the Commission's resolution of the \n\"minimum charge\" issue raised in my concurrence to the December Order,' which I \nbelieve provides a reasonable path forward based on the record before us. \n2.\nIn its December Order, the Commission asked two briefing questions regarding \nestablishing an additional charge for Eligible Customers on behalf of a Co-Located Load \nthat elects not to take any amount of transmission service or only a de minimis amount of \n1  PJM Interconnection, L.L.C., 193 FERC ¶ 61,217 (2025) (December Order) \n(Comm'r Chang, concurring). \n433 of 515"},{"page":143,"startToken":58422,"endToken":58909,"text":"Dod-ument Accessicir; qq-236CZA18_ 3RWUMerlt:Flitd EPAg9:61e3A8/2Me Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n- 3 \ntransmission service.2  At that time, I wrote separately to emphasize my concern that the \nimplementation of our rules around the new transmission services could risk cost shifting \nif those loads take little or no transmission service and thereby do not contribute to \npaying for the transmission system costs. Broadly, I remain vigilant about the impacts on \nconsumers as the Commission continues to respond to new challenges from large and Co-\nLocated Loads. \n3.\nIn today's order, the Commission concludes that the record does not adequately \nsupport either the need for an additional charge at this time, or how such a charge should \nbe calculated and assessed. In so doing, the Commission acknowledges the complexity \nof (1) documenting the benefits that accrue to Co-Located Loads paying little or no \ntransmission service from the grid, and (2) designing a charge that corresponds to those \nbenefits. \n4.\nAs explained in my concurrence to the December Order, because the Commission \ndoes not require a Co-Located Load to take any specific amount of the new transmission \nservices, it creates the possibility that the load could pay little or nothing towards the \ncosts of the transmission system, notwithstanding potential benefits it receives from that \nsystem. If this fact pattern occurs, particularly on any significant scale, it may result in \nproblematic cost shifts to other transmission customers. However, if Co-Located Loads \ndo, in fact, take meaningful transmission service via an existing service or one or both of \nthe new contract demand services, they would pay transmission charges that contribute to \nthe recovery of the transmission system's capital and operations and maintenance costs. \nTherefore, whether underlying concerns around cost shifting actually manifest will \nultimately depend on how the new transmission services will be used. \n5.\nSo, today's order reasonably concludes that insights from concrete experience \nwith the use of these new transmission services will help inform whether further action \nwould be needed to address cost shifting issues. Given the challenges demonstrated in \nthe record with articulating or documenting the specific benefits associated with being \nsynchronized to the PEW system, and designing a rate (including conditions under which \nand the parties to whom it will be charged) that is commensurate with those benefits, I \nam persuaded that continued monitoring of this issue is appropriate. \n6.\nFurthermore, as part of a broader recognition that implementing the new \ntransmission services represents a significant development in PJM, the Commission \ndirects PJM to prepare an annual report that includes critical information about how these \nservices are being requested and used, as well as how loads using the services contribute \ntoward transmission owners' revenue requirements.3  The annual reports will provide \n2  December Order, 193 FERC ¶ 61,217 at P 219, questions 3 and 4. \n3  PJM Interconnection, L.L. C., 195 FERC ¶ 61,209, at PP 580-81 (2026). \n434 of 515"},{"page":144,"startToken":58909,"endToken":59010,"text":",Document AccessigP. \nc Z-§)-AgAls 3Q9cu me nt:Fl \nrpal@g9 : 6163A812pAte Filed: 10/16/2026 \nDocket No. EL25-49-002, et al. \n4 \ninformation that helps the Commission, the states, market participants, and stakeholders \nmonitor the impacts of these new transmission services, including assessing whether the \npotential cost shift concern discussed above and in my prior concurrence actually occurs. \nIf it does, I stand ready to consider Federal Power Act section 205 filings or section 206 \ncomplaints (including sua sponte action by the Commission) to address those cost shifts. \nFor these reasons, I respectfully concur. \nJudy W. Chang \nCommissioner \n435 of 515"},{"page":145,"startToken":59010,"endToken":59031,"text":"Dodziinent-  Acce6eigitr; 2S)16q18-3489unient:Flild. rFa'q99: Mq8/2Me Filed: 10/16/2026 \nDocument Content(s) \nEL25-49-002.docx \n1 \n436 of 515"},{"page":146,"startToken":59031,"endToken":59075,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 437 \nDate Filed: 10/16/2026 \nATTACHMENT D \nPJM Interconnection, L.L.C. et al.; Notice of Denial of Rehearing By \nOperation of Law and Providing for Further Consideration, 196 FERC \n¶ 62,089 (Aug. 20, 2026). \n437 of 515"},{"page":147,"startToken":59075,"endToken":59270,"text":"Document AccessigiA 22q-Aq1 _ Apgument:FlAd rpa@g: 6183A012pAte Filed: 10/16/2026 \n196 FERC ¶ 62,089 \nUNTIED STATES OF AMERICA \nFEDERAL ENERGY REGULATORY COMMISSION \nPJM Interconnection, L.L.C. \nAllegheny Electric Cooperative, Inc. \nAmerican Transmission Systems, Incorporated \nAtlantic City Electric Company \nBaltimore Gas and Electric Company \nDelmarva Power & Light Company \nDuke Energy Ohio, Inc. \nDuke Energy Kentucky, Inc. \nEast Kentucky Power Cooperative, Inc. \nEssential Power Rock Springs, LLC \nHudson Transmission Partners, LLC \nJersey Central Power & Light Company \nMid-Atlantic Interstate Transmission, LLC \nNeptune Regional Transmission System, LLC \nOld Dominion Electric Cooperative \nPECO Energy Company \nPPL Electric Utilities Corporation \nPotomac Electric Power Company \nPublic Service Electric and Gas Company \nRockland Electric Company \nTrans-Allegheny Interstate Line Company \nTransource West Virginia, LLC \nUGI Utilities, Inc. \nMonongahela Power Company \nThe Potomac Edison Company \nCommonwealth Edison Company \nCommonwealth Edison Company of Indiana, Inc. \nThe Dayton Power and Light Company \nAEP Appalachian Transmission Company, Inc. \nAEP Indiana Michigan Transmission Company, Inc. \nAEP Kentucky Transmission Company, Inc. \nAEP Ohio Transmission Company, Inc. \nAEP West Virginia Transmission Company, Inc. \nAppalachian Power Company \nIndiana Michigan Power Company \nKentucky Power Company \nKingsport Power Company \nOhio Power Company \nWheeling Power Company \nDocket Nos. EL25-49-003 \n438 of 515"},{"page":148,"startToken":59270,"endToken":59529,"text":"Document Accessigi \n22qAqlo _Apcurnent:Flil d ripAg:616.3A 012 p-Ate Filed: 10/16/2026 \nDocket No. EL25-49-003, et al. \n-2-\nDuquesne Light Company \nVirginia Electric and Power Company \nLinden VFT, LLC \nCity of Cleveland, Department of Public Utilities, \nDivision of Cleveland Public Power \nCity of Hamilton, OH \nSouthern Maryland Electric Cooperative, Inc. \nOhio Valley Electric Corporation \nAMP Transmission, LLC \nSilver Run Electric, LLC \nNextEra Energy Transmission MidAtlantic Indiana, Inc. \nWabash Valley Power Association, Inc. \nKeystone Appalachian Transmission Company \nLarge Loads Co-Located at Generating Facilities \nAD24-11-002 \nConstellation Energy Generation, LLC \nEL25-20-002 \n(consolidated) \nv. \nPJM Interconnection, L.L.C. \nPJM Interconnection, L.L.C. \nER26-1479-001 \nNOTICE OF DENIAL OF REHEARING BY OPERATION OF LAW AND \nPROVIDING FOR FURTHER CONSIDERATION \n(August 20, 2026) \nRehearing has been timely requested of the Commission's order issued on \nJune 18, 2026, in this proceeding. PJM Interconnection, L.L.C., 195 FERC ¶ 61,209 \n(2026). In the absence of Commission action on a request for rehearing within 30 days \nfrom the date it is filed, the request for rehearing may be deemed to have been denied. \n16 U.S.C. § 8251(a); 18 C.F.R. § 385.713 (2025); Allegheny Def. Project v. FERC, \n964 F.3d 1 (D.C. Cir. 2020) (en bans). \nAs provided in 16 U.S.C. § 8251(a), the requests for rehearing of the above-cited \norder filed in this proceeding will be addressed in a future order to be issued consistent \nwith the requirements of such section. As also provided in 16 U.S.C. § 8251(a), the \n439 of 515"},{"page":149,"startToken":59529,"endToken":59578,"text":"_ _ Dobumerit Accesbigf?g 22c3-AqA10 _ 31dppmentFlil d \n6184A 0 12  pge Filed: 10/16/2026 \nDocket No. EL25-49-003, et al. \n-3-\nCommission may modify or set aside its above-cited order, in whole or in part, in such \nmanner as it shall deem proper. \nDebbie-Anne A. Reese, \nSecretary. \n440 of 515"},{"page":150,"startToken":59578,"endToken":59602,"text":"Document AccessigiS:: 2A-AA10_ 31d9gument:Flild jcpa g9:61,84/120/2pAte Filed: 10/16/2026 \nDocument Content(s) \nEL25-49-003.docx \n1 \n441 of 515"},{"page":151,"startToken":59602,"endToken":59620,"text":"_Case: 26-3621 \nDocument: 1-1 \nPage: 442 \nDate Filed: 10/16/2026 \nATTACHMENT E \nSERVICE LIST \n442 of 515"},{"page":152,"startToken":59620,"endToken":59792,"text":"Andrew \nHinz \nAndrew Hinz \n1427 PARK AVE \nBALTIMORE, MARYLAND \n21217 \nUNITED STATES \nahinz61@outlook.com \nPrimary Person or Counsel \nof Record to be Served \nParty \nMichael Haugh \nPolicy Director \nAdvanced Energy United \n1010 VERMONT AVE NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nmhaugh@advancedenergyunited.or \ng \nAdvanced \nEnergy \nUnited \nAEP \nAppalachia \nn \nTransmissi \non \nCompany, \nInc. \nStacey Burbure \nSVP, Transmission Regulatory \nEngagement & Compliance \n8500 Smiths Mill Road, 4th Floor \nNew Albany, OHIO 43054 \nUNITED STATES \nslburbure@aep.com \nJessica A. Cano \nAssoc.Gen.Counsel Regul. East \n1 Riverside Plaza \nColumbus, OHIO 43215-2372 \njacano@aep.com \nAEP \nIndiana \nMichigan \nTransmissi \non \nCompany, \nInc. \nJennifer Key \n1330 Connecticut Ave., N.W. \nWashington, DISTRICT OF \nCOLUMBIA 20036 \nUNITED STATES \n'key@steptoe.com \nJessica A. Cano \nAssoc.Gen.Counsel Regul. East \n1 Riverside Plaza \nColumbus, OHIO 43215-2372 \n'acano@aep.com \nAEP \nKentucky \nStacey Burbure \nSVP, Transmission Regulatory \nJessica A. Cano \nAssoc.Gen.Counsel Regul. East \nOther Contact to be Served \n- 1 - \nCase: 26-3621 \nDocument: 1-1 \nPage: 443 \nDate Filed: 10/16/2026 \n443 of 515"},{"page":153,"startToken":59792,"endToken":59995,"text":"Case: 26=3621 \nDocument: 1-1 \nPage: 444 \nDate Filed: 10/16/2026 \nTransmissi ; \non \nCompany, \"New \nInc. \n! \nEngagement & Compliance \n8500 Smiths Mill Road, 4th Floor \nAlbany, OHIO 43054 \nUNITED STATES \nslburbure@aep.com \n1 Riverside Plaza \nColumbus, OHIO 43215-2372 \njacano@aep.com \n- - ---\nAEP Ohio i \nTransmissi \n \non \nCompany, \nInc. \nJessica Cano \nAssoc.Gen.Counsel Regul. East \n1 Riverside Plaza \nColumbus, OHIO 43215-2372 \nUNITED STATES \njacano aep.com \n! \n; : \n' \nRobert L Pennybaker \nRegulated Pricing & Analysis M \n PO Box 201 \nTULSA,OHIO 74102 \nrlpennybaker@aep.com \n; \nAEP West \nVirginia \n' \nTransmissi \non \nCompany, \nInc. \nStacey Burbure \nSVP, Transmission Regulatory \nEngagement & Compliance \n8500 Smiths Mill Road, 4th Floor \nNew Albany, OHIO 43054 \nUNITED STATES \nslburbure@aep.com \nJessica A. Cano \nAssoc.Gen.Counsel Regul. East \n1 Riverside Plaza \nColumbus, OHIO 43215-2372 \njacano@aep.com \nAES \nCorporatio \nn, The \n;\n! \nElizabeth Savage \nAES Corporation, The \n4300 Wilson Blvd \nArlington, VIRGINIA 22203 \nUNITED STATES \nelizabeth.savage@aes.com \nAllegheny \nElectric \nCooperativ i \ne, Inc. \n! \ni \ni \n1212 \nTodd Sallade \nVP Power Supply & Engineering \nAllegheny Electric Cooperative, \nInc. \nLocust Street \nHarrisburg, PENNSYLVANIA \n17101 \ntodd sallade@ccsenergy.coln \nAlliant \n: \nEnergy \n \nCorporate ; \nServices, \nInc. \nMary Emerson \nCorporate Counsel \nAlliant Energy Corporation \n801 PENNSYLVANIA AVE NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20004\n \n2 \n444 of 515"},{"page":154,"startToken":59995,"endToken":60142,"text":"UNITED STATES \nmaryemerson@alliantenergy.com \nAlpha \nGeneration, \nLLC \nLiam Baker \nSenior Vice President Regulato \nAlpha Generation, LLC \n300 Atlantic Street \n5th floor \nStamford, CONNECTICUT 06901 \nUNITED STATES \nlbaker@alphagen.com \nAmeren \nServices \nCompany \non behalf \nof Ameren \nIllinois \nCompany, \nAmeren \nTransmissi \non \nCompany \nof Illinois \nand Union \nElectric \nCompany \nd/b/a \nAmeren \nMissouri \nStacey Scales \nParalegal \nAmeren Services Company \n1901 Chouteau \nMail Code 1310 \nSt. Louis, MISSOURI 63103 \nUNITED STATES \nsscales@ameren.com \nJennifer S. Moore \nSenior Corporate Counsel \nAmeren Services Company \n1901 Chouteau Avenue \nMail Code 1310 \nSt. Louis, MISSOURI 63103 \njmoore499a@ameren.com \nBrett White \nDeputy General Counsel \nAmerican Clean Power Association \n1299 Pennsylvania Avenue, N.W. \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20004 \nUNITED STATES \nbwhite@cleanpower.org \nAmerican \nClean \nPower \nAssociation \nAmerican \nClean \nCarrie Zalewski \nVP & Markets and Transmission \nCase: 26-3621 \nDocument: 1-1 \nPage: 445 \nDate Filed: 10/16/2026 \n- 3 - \n445 of 515"},{"page":155,"startToken":60142,"endToken":60282,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 446 \nDate Filed: 10/16/2026 \nPower \n, \nAssociation \nWashington, DISTRICT OF \nCOLUMBIA 20036 \nUNITED STATES \nczalewski@cleanpower.org \n' \nAmerican ' \nCouncil on ' \nRenewable \nEnergy \nElise Caplan \nDirector of Electricity Policy \nAmerican Council on Renewable \nEnergy \n1150 CONNECTICUT AVE NW \nSTE 401 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nUNITED STATES \ncaplan@acore.org \nAmerican \nElectric \nPower \nService \nCorporatio \nn \nStacey Burbure \nSVP, Transmission Regulatory \nAmerican Electric Power \nCompany \nEngagement & Compliance \n8500 Smiths Mill Road, 4th Floor \nNew Albany, OHIO 43054 \nslburbure@aep.com \nAmerican \nPower \nService \nCorporatio \nn \nElectric\n' Kate Daley \n1 Riverside Plaza \nColumbus, OHIO 43215 \nkbdaley@aep.com \nAmerican \nElectric \nPower \nService \nCorporatio , \nn \n' \n: \n, \nAdam Hickman \n1 RIVERSIDE PLZ FL 25 \nCOLUMBUS, OHIO 43215 \najhickman@aep.com \n. \n. _ \nAmerican \nElectric \nPower \nService \n, \ni \nLaChon Turner \nAEP COMPANIES \n801 PENNSYLVANIA AVE NW \nSTE 735\n \n4 \n446 of 515"},{"page":156,"startToken":60282,"endToken":60467,"text":"American \nForest & \nPaper \nAssociation \nCase: 26-3621 \nDocument: 1-1 \nPage: 447  \nDate Filed: 10/16/2026 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20004 \nlturner@aep.com \nCorporatio \nKenneth Stark \nMcNees Wallace & Nurick LLC \n100 Pine Street \nP.O. Box 1166 \nHarrisburg, PENNSYLVANIA \n17108 \nUNITED STATES \nkstark@mcneeslaw.com \nSusan E. Bruce \nMcNees Wallace & Nurick LLC \n100 Pine Street \nP.O. Box 1166 \nHarrisburg, PENNSYLVANIA \n17108 \nsbruce@mcneeslaw.com \nAmerican \nForest & \nPaper \nAssociation \nMatthew L. Garber \nMcNees Wallace & Nurick LLC \n100 Pine Street \nP.O. Box 1166 \nHarrisburg, PENNSYLVANIA \n17108 \nmgarber@mcneeslaw.com \nLisa McAlister \nDeputy General Counsel - FERC/ \nAmerican Municipal Power, Inc. \n1111 Schrock Road \nSuite 100 \nColumbus, OHIO 43229 \nUNITED STATES \nlmcalister@amppartners.org \nGerit F. Hull \nDeputy General Counsel - Regul \nAmerican Municipal Power, Inc. \n1111 Schrock Road \nSuite 100 \nCOLUMBUS, OHIO 43229 \nghull@amppartners.org \nAmerican \nMunicipal \nPower, Inc. \nJohn E. McCaffrey \nPartner \nStinson LLP \n1775 Pennsylvania Avenue NW \nSuite 800 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20006 \n*ohn.mccaffrey@stinson.com \nAmerican \nMunicipal \nPower, Inc. \nChristopher J Norton \nDirector of Market Regulatory \nAmerican Municipal Power, Inc. \n1111 Schrock Road \nAmerican \nMunicipal \nPower, Inc. \n5 \n447 of 515"},{"page":157,"startToken":60467,"endToken":60649,"text":"Ca-se: 2&3621 \nDocument: 1-1 \nPage: 448 \nDate Filed: 10/16/2026 \nSuite 100 \nColumbus, OHIO 43229 \nIcnorton@amppartners.org \nAMERICA ! \nN \nPETROLE ' \nUM \n' \nINSTITUT \nE \n' \nGrace Soderberg \nSenior Counsel \nAMERICAN PETROLEUM \nINSTITUTE \n200 MASSACHUSETTS AVE \nNW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nsoderbergg@api.org \nAmerican \nTransmissi \non \nSystems, \nIncorporate \nd \nAmanda Parker \nAttorney \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.com \nDeborah L. Jacobson, ESQ \nAttorney \n341 WHITE POND DR \nAKRON, OHIO 44320\n \ndjacobson@firstenergycorp.com \nAmerican \n: \nTransmissi \n: \non \nSystems, \nIncorporate '\n• \nd \nAmanda Parker \nAttorney \nFirstEnergy Service Company \n76 South Main Street \nAkron, OHIO 44308 \nUNITED  STATES \naparker@firstenergycorp.com \nTricia S Hartzell \n, \nFirstEnergy Legal Specialist \nFirstEnergy Service Company \ni 76 S. Main Street \n15th Floor \n: Akron, OHIO 44308 \nthartzell@firstenergycorp.com .. \nAmerican \n \nTransmissi , \non \nSystems, \nI \nIncorporate ! \ni \nd \nMorgan Parke \nAssociate General Counsel \nFirstEnergy \n341 White Pond Dr. \nAkron, OHIO 44320 \nUNITED STATES \nmparke@firstenergycorp.com \nAmericans \nfora Clean :10 \nEnergy \ni \nGrid \n,....._,..._. \n_. \n, \nPaige Rodrigues \nAmericans for a Clean Energy Grid \nG St NE \nWashington, DISTRICT OF \nCOLUMBIA 20002 \n-6 \n448 of 515"},{"page":158,"startToken":60649,"endToken":60858,"text":"UNITED STATES \npaige.rodrigues@cleanenergygrid.o \nrg \nLisa G McAlister \nDeputy General Counsel - FERC/ \n1111 Schrock Road \nSuite 100 \nColumbus, OHIO 43229 \nlmcalister@amppartners.org \nAMP \nTransmissi \non, LLC \nLisa McAlister \nDeputy General Counsel - FERC/ \nAmerican Municipal Power, Inc. \n1111 Schrock Road \nSuite 100 \nColumbus, OHIO 43229 \nUNITED STATES \nImcalister@amppartners.org \nChristopher J Norton \nDirector of Market Regulatory \nAmerican Municipal Power, Inc. \n1111 Schrock Road \nSuite 100 \nColumbus, OHIO 43229 \ncnorton@amppartners.org \nJason Evans \nVice President \nAntora Energy LLC \n1080 W. Ewing Place - Box B10 \nSeattle, WASHINGTON 98119 \nUNITED STATES \njason.evans@tuusso.com \nNoah B Long \nDirector, State & Regulatory P \nAntora Energy LLC \n200 W DE VARGAS ST STE 200 \nSANTA FE, NEW MEXICO \n87501 \nnoah.long@antora.com \nAntora \nEnergy \nLLC \nNoah Long \nDirector, State & Regulatory P \nAntora Energy LLC \n200 W DE VARGAS ST STE 200 \nSANTA FE, NEW MEXICO \n87501 \nUNITED STATES \nnoah.long@antora.com \nJessica Cano \nAssoc.Gen.Counsel Regul. East \n1 Riverside Plaza \nColumbus, OHIO 43215-2372 \nUNITED STATES \nacano@aep.com \nRobert L Pennybaker \nRegulated Pricing & Analysis M \nPO Box 201 \nTULSA,OHIO 74102 \nrlpennybaker@aep.com \nAntora \nEnergy \nLLC \nAppalachia \nn Power \nI Company \nCase: 26-3621 \nDocument: 1-1 \nPage: 449 \nDate Filed: 10/16/2026 \n7 \n449 of 515"},{"page":159,"startToken":60858,"endToken":61044,"text":"--Case: 26-3621 \nDocument: 1-1 \nPage: 450 \nDate Filed: 10/16/2026 \n; \nAppalachia ; \nn Voices \n \nNicholas Guidi \nSouthern Environmental Law \nCenter \n500 NEW JERSEY AVE NW STE \n600 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nnguidi@selc.org \nKatherine Rogers \n€ Southern Environmental Law \nCenter \n122 C ST NW STE 325 \n; WASHINGTON, DISTRICT OF \ni COLUMBIA 20001 \n; krogers@selc.org \nArevon \n' \nEnergy, \nInc. \n' \nMike Gahimer \nArevon Energy, Inc. \n14427 Salem Dr E \nCarmel, INDIANA 46033 \nUNITED STATES \nmgahimer@arevonenergy.com \nArkansas \nPublic \nService \nio \nCommi ss \nn \n: \nBridgette Frazier \nArkansas Public Service \nCommission \n1000 CENTER ST \nLITTLE ROCK, ARKANSAS \n72201 \nUNITED STATES \nbridgette.frazier@arkansas.gov \n, \nAtlantic \nCity \nElectric \nCompany \n, \n' \nCarlos Isaac \nAssistant General Counsel \nExelon Corporation \n10 S. Dearborn Street \nChicago, ILLINOIS 60603 \nUNITED STATES \ncarlos.isaac@exeloncorp.com \n, Stan Berman \n' 3502 Fremont Ave N, #1 \n' Seattle, WASHINGTON 98103 \nstan@bermlaw.com \nAvant-.d \n!\n, Avangrid \n- 1 '  \nInc. \n, \nJulie Morris \nCompliance \nPower, LLC \n2701 NW VAUGHN ST STE 300 , \nPORTLAND, OREGON 97210 \nUNITED STATES \navangridpowerferc@avangrid.com ' \nAlan Trotta \nUnited Illuminating Company, \nThe \n157 Church Street \nNew Haven, CONNECTICUT \n06510 \nalan.trotta@tlinet.cotn \n__ \n_ \n8 \n450 of 515"},{"page":160,"startToken":61044,"endToken":61238,"text":"Diane Janicki \nINDIVIDUAL \n500 West Madison \nChicago, ILLINOIS 60661 \nDiane.Janicki@betm.com \nCase: 26-3621 \nDocument: 1-1 \nPage: 451 \nDate Filed: 10/16/2026 \nAvangrid, \nInc. \nBaltimore \nGas and \nElectric \nCompany \nNoelle Kinsch \nVP, Gen.Counsel & Corp Sec. \nAvangrid Networks, Inc. \n80 State Street \nAlbany, NEW YORK 12207 \nUNITED STATES \nnoelle.kinsch@avangrid.com \nCarlos Isaac \nAssistant General Counsel \nExelon Corporation \n10 S. Dearborn Street \nChicago, ILLINOIS 60603 \nUNITED STATES \ncarlos.isaac@exeloncorp.com \nJoel Newton \nVP, Regulatory Law \nBloom Energy Corporation \n6611 Dearborn Dr \nFalls Church, VIRGINIA 22044 \nUNITED STATES \njoel.newton@bloomenergy.com \nMichael Blasik \nDiamond Generating Corporation \n1 International Place \nSuite 910 \nBoston, MASSACHUSETTS \n02110 \nUNITED STATES \nm.blasik@dgc-us.com \nKevin Kilgallen \nDirector, Market Structure & P \nAvangrid, Inc. \n411 OAKLAND DR \nDOWNINGTOWN, \nPENNSYLVANIA 19335 \nkevin.kilgallen@avangrid.com \nStan Berman \n3502 Fremont Ave N, #1 \nSeattle, WASHINGTON 98103 \nstan@bermlaw.com \nBloom \nEnergy \nCorporatio \nn \nBoston \nEnergy \nTrading \nand \nMarketing \nLLC \nDuane K. Duclaux \nGeneral Counsel \nBrightNight, LLC \n515 N FLAGLER DR STE P200 \nWEST PALM BEACH, \nFLORIDA 33401 \nduane@brightnightpower.com \nRobert C. Fallon \nENGELMAN FALLON, PLLC \nBrightNigh \nt Power \nMarketing, \nLLC \nBrightNigh \nt Power \n9 \n451 of 515"},{"page":161,"startToken":61238,"endToken":61415,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 452 \nDate Filed: 10/16/2026 \n    \n \n  \n   \n \n   \n \n   \n    \n \n  \n   \n \n   \n \n   \n  Marketing, \nLLC \n  \n  1717 K St. NW \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nrfallon@efenergylaw.com \n  \n  \n   \n  \n  \n  \n  \n \n  \n   \n \n \n  \n \n  \n  \n \nathalie Godard \nLaw Clerk \nBrookfield Energy Marketing LP \n41 Victoria Street \nGatineau, QUEBEC J8X2A1 \nCANADA \nnathalie.godard@brookfieldrenewa \nble.com \n Aleksandar Mitreski \nBrookfield Energy Marketing Inc. \n68 Ellington St \nLongmeadow, \nMASSACHUSETTS 01106 \naleksandar.mitreski@brookfieldre \nnewable.com \n  \n   \nBrookfield \nRenewable \nTrading \nand \nMarketing \nLP \n \n \n \n  \n \n \n \n    \n \n  \n   \n \n   \n \n   \n  \nBrookfield \nRenewable \nTrading \nand \nMarketing \nLP \n  \n  \nSteve Kelly \nDirector \nBrookfield Energy Marketing LP \n3261 Arters Mill Rd \nWestminster, MARYLAND \n21158 \nstephen.kelly@brookfieldrenewab \nle.com \n  \n   \n  \n  \n  \n   \n  \n  \n  \n   \n  \n  \n  \n     \n \n  \n   \n \n \n  \n \n  \n  \n     \n \n \nLija Kaleps-Clark \nBuckeye Power, Inc. \n6677 Busch Blvd \nColumbus, OHIO 43229 \nUNITED STATES \nlkaleps@ohioec.org \nMatt Barnes \nCalibrant Energy \n16 Gavin Cir \nAndover, MASSACHUSETTS \n01810 \nUNITED STATES \nmatthew.barnes@calibrantenergy.c \nom \n  Kurt Helfrich \nBuckeye Power, Inc. \n6677 Busch Boulevard \nColumbus, OHIO 43229 \nkhelfrich@ohioec.org \n  \n  \n  \nBuckeye \nPower, Inc.  \n  \n   \n  \n \n  \n   \n    \n \n \n   \n \n   \n \n   \n  \nCalibrant \nEnergy \n \n   \n \n   \n \n   \n  California \nDepartment \nof Water \nResources \n Lisa Dowden \nSenior Counsel \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n  Stephen C. Pearson \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \n   \n  \n \n  \n   \n    \n \n  \n   \n \n   \n \n   \n    \n \n  \n   \n \n   \n \n   \n- 10 - \n452 of 515"},{"page":162,"startToken":61415,"endToken":61606,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 453 \nDate Filed: 10/16/2026 \n     \n   \n \n  \n \n \n  \n  \nState Water \nProject \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nUNITED STATES \nLisa.Dowden@spiegelmcd.com \n \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nsteve.pearson@spiegelmcd.com \n    \n \n \n \n \n    \n \n \n \n  \n \n \n   \n    \n \n \n  \n \n  \n \n \n   \n  California \nDepartment \nof Water \nResources \nState Water \nProject \n \n \n Samuel B. Whillans \nSpiegel & McDiarmid LLP \n1818 N ST NW \n8TH Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nsamuel.whillans@spiegelmcd.com \n  \n  \n \n \n \n  \n  \n \n \n \n  \n    \n \n \n  \n \n \n  \n    \n \n \n Amanda Drennen \nAttorney \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nUNITED STATES \namanda.drennen@spiegelmcd.com \n  \n \n \n   \n    \n \n \n \n  \n \n \n   \n    \n \n \n \n Nhu Nguyen \nDeputy Attorney General \nCalifornia Department of Justice \n1300 I Street \nSacramento, CALIFORNIA \n95814 \nnhu.nguyen@doj.ca.gov \n   \n  \nCalifornia \nDepartment \nof Water \nResources \nState Water \nProject \n \n   \n    \n \n  \n  \n \n \n   \n  \nCalifornia \nDepartment \nof Water \nResources \nState Water \nProject \n \n \n \nE Service \nSpiegel & McDiarmid LLP \n1818 N Street NW \n8th Floor \nWashington, DISTRICT OF \nCOLUMBIA 20036 \neservice@spiegelmcd.com \n   \n  California \nDepartment \nof Water \nResources \nState Water \nProject \n \n \n  \n \n \n  \n  \n \n \n \nRobert S Hedrick \nOffice of the General Counsel \nPO Box 899 \nSACRAMENTO, \nRobert.Hedrick@water.ca.gov \n   \n  \n \n \n  \n \n \n   \n  \n \n \n  \n \n \n   \n  \nCalifornia \nDepartment \nof Water \nResources \n \n \n \nRobin M. Hennessy \nOffice of the General Counsel \nDepartment of Water Resources \nPO Box 899 \n   \n    \n \n   \n \n  \n \n \n   \n    \n \n   \n \n  \n \n \n   \n    \n \n   \n \n  \n \n \n   \n453 of 515"},{"page":163,"startToken":61606,"endToken":61776,"text":"Case: 26-3621 _ Document: 1-1 \nPage: 454 \nDate Filed: 10/16/2026 \nState Water; \nProject \n,.. \n1 \nSACRAMENTO, \nrobin.hennessy water.ca.gov \nCalifornia \nDepartment \nof Water \nResources ! \nState Water \nProject \n, \nX95814 \nRegina Tochterman \nSenior Legal Analyst \nCalifornia Department of Justice \n1300 I Street \nSacramento, CALIFORNIA \nRegina.Tochterman@doj.ca.gov \nCalifornia \nPublic \nUtilities \nCommissio \nn \nChristofer Nolan \nCalifornia Public Utilities \nCommission \n505 Van Ness Avenue \nSAN FRANCISCO, \nCALIFORNIA 94102 \nUNITED STATES \nchristofer.nolan@cpuc.ca.gov \nAnand Durvasula \nCalifornia Public Utilities \nCommission \n505 VAN NESS AVE \nSAN FRANCISCO, \nCALIFORNIA 94102 \nanand.durvasula@cpuc.ca.gov\n \nCalifornia \n, Public \nUtilities \nCommissio \nn \n' \nSimon T. Hurd \nCalifornia Public Utilities \nCommission \n505 Van Ness Avenue \nSan Francisco, CALIFORNIA \n94102 \nSimon.Hurd@cpuc.ca.gov \nCalpine \n, \nCorporatio \nn \nSarah Novosel \nSR Vice President Gov. Affairs \nCalpine Corporation \n717 Texas Avenue, Suite 1000 \nHouston, TEXAS 77002 \nUNITED STATES \nsnovosel@calpine.com \nCalpine \nCorporatio \nn \nRachael Marsh \nV.P. and Managing Counsel \nPO Box NA \nHouston,TEXAS 77002 \nUNITED STATES \nrachael.marsh@calpine.com \n, \n-12-\n454 of 515"},{"page":164,"startToken":61776,"endToken":61916,"text":"Tom Smith \n1300 Lakeside Avenue \nCleveland, OHIO 44114 \ntsmith@cpp.org \nCity of \nCleveland, \nDepartment \nof Public \nUtilities, \nDivision of \nCleveland \nPublic \nPower \nDavid Scarpignato \nCalpine Corporation \nCalpine \n717 Texas Avenue \nCorporatio Suite 1000 \nn \nHouston, TEXAS 77002 \nUNITED STATES \ndavid.scarpignato@calpine.com \nHoward Crystal \nSenior Attorney \nCenter for Biological Diversity \n1411 K ST NW STE 1300 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nhcrystal@biologicaldiversity.org \nVanessa Colon \nSenior Counsel \nChevron U.S.A. Inc. \n1400 SMITH ST RM 31158 \nHOUSTON, TEXAS 77002 \nUNITED STATES \nvanessa.colon@chevron.com \nAndrew Davitt \nChevron U.S.A. Inc. \nChevron \n1400 SMITH ST RM 06076 \nU.S.A. Inc. HOUSTON, TEXAS 77002 \nUNITED STATES \nandrewdavitt@chevron.com \nCenter for \nBiological \nDiversity \nChevron \nU.S.A. Inc. \nCase: 26-3621 \nDocument: 1-1 \nPage: 455 \nDate Filed: 10/16/2026 \n-13-\n455 of 515"},{"page":165,"startToken":61916,"endToken":62120,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 456 \nDate Filed: 10/16/2026 \nCity of \nHamilton, \nOhio \nr \nMichael R. Perry \nDirector of Electric \n345 High Street \nSuite 450 \nHamilton, OHIO 45011 \nperrym@ci.hamilton.oh.us \nClean Air \n' \nTask Force \nShaun Goho \n114 STATE ST FL 6 \n' \nBOSTON, MASSACHUSETTS \n' \n02109 \nUNITED STATES \nsgoho@catf.us\n. \nAnn Weeks. \nClean Air Task Force \n18 Tremont St \nBoston, MASSACHUSETTS \n02108 \naweeks@cat£us \nClean \nEnergy \n- \nBuyers \nAssociation \nBryn Baker \nCorporate Energy Buyers Associ \n1501 M ST NW STE 900 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nbbaker@ceba.org \nClearway \n' \nEnergy \nGroup LLC \nGretchen Schott \nAssistant General Counsel, Reg \n' \nClearway Energy Group LLC \n' \n1200 SMITH ST STE 600 \n: \nHOUSTON, TEXAS 77002 \n: \nUNITED STATES \ngretchen.schott@clearwayenergy.c : \nom \n!imiller@ceba.9rg \nJohn C Miller \nDirector, Transmission Policy \nCorporate Energy Buyers \nAssociation \n1501 M ST NW STE 900 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nCogentrix \n \nEnergy \nPower \ni \nManageme \nnt, LLC \n, \n' \nBrian Zimmet \nPartner \n1 THOMAS CIR NW \ni \nROCK CREEK ENERGY \nGROUP, LLP \nWASHINGTON, DISTRICT OF \n; \nCOLUMBIA 20005 \n, \nUNITED STATES \n; \nbzimmet@rockcreekenergygroup.c \nom \nMarica Sharashenidze \nRock Creek Energy Group, LLP \n1 Thomas Circle \nSuite 700 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nmsharashenidze@rockcreekenergy \ngroup.com \n- 14 - \n456 of 515"},{"page":166,"startToken":62120,"endToken":62319,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 457 \nDate Filed: 10/16/2026 \n   \n \n \n \n \n    \n \n \n \n \n \n   \nCogentrix \nEnergy \nPower \nManageme \nnt, LLC \n \n \n \n \n   \nGeorge Knapp \nGeneral Counsel \n13860 Ballantyne Corporate Place \nSuite 300 \nCharlotte, NORTH CAROLINA \n28277 \nGeorgeKnapp@cogentrix.com \nStephanie C Kueffner ESQ \nAssociate General Counsel \nCogentrix Energy Power \nManagement, LLC \n13860 BALLANTYNE \nCORPORATE PL STE 300 \nCHARLOTTE, NORTH \nCAROLINA 28277 \nstephaniekueffner@cogentrix.com \n \n    \n \n \n \n \n   \n \n    \n \n \n \n \n   \n \n   \nCogentrix \nEnergy \nPower \nManageme \nnt, LLC \n \n \n \n \n   \n \n   \n \n \n \n \n   \n \n   \n \n \n \n \n   \n \n   \n \n \n \n \n   \n \n   \n \n \n \n \n    \n \n \n \n \n \n   \nCarlos Isaac \nAssistant General Counsel \nExelon Corporation \n10 S. Dearborn Street \nChicago, ILLINOIS 60603 \nUNITED STATES \ncarlos.isaac@exeloncorp.com \n \n    \n \n \n \n \n \n   \nCommonw \nealth \nEdison \nCompany \n \n   \nStan Berman \n3502 Fremont Ave N, #1 \nSeattle, WASHINGTON 98103 \nstan@bermlaw.com \n \n   \n \n   \n \n   \n \n   \n \n   \n \n   \n \n    \n \n \n \n \n    \n \n \n \n \n \n   \nCommonw \nealth \nEdison \nCompany \nof Indiana, \nInc. \nMarianne Alvarez \nSenior Analyst \n101 Constitution Ave, NW \nSuite 400 East \nWashington, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nmarianne.alvarez@exeloncorp.com \n   \nAmy L Blauman \nAssociate General Counsel \n701 Ninth St. N.W. \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \namy.blauman@exeloncorp.com \n \n   \n   \n \n   \n   \n \n   \n   \n \n   \n   \n \n    \n \n \n \n \n    \n \n \n \n \n \n    \n \n \n \n \n    \n \n \n \n \n \n   \nConnecticu \nt Municipal \nElectric \nEnergy \nCooperativ \ne \nScott Strauss \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \n  \nJeffrey A. Schwarz \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \njeffrey.schwarz@spiegelmcd.com  \n    \n \n \n \n \n    \n \n \n \n \n \n    \n \n \n \n \n    \n \n \n \n \n \n    \n \n \n \n \n    \n \n \n \n \n \n    \n \n \n-15-\n    \n \n \n \n \n \n457 of 515"},{"page":167,"startToken":62319,"endToken":62543,"text":"-Case: 26-3621 \nDocument: 1-1 \nPage: 458 \nDate Filed: 10/16/2026 \nUNITED STATES \nScott.Strauss@spiegelmcd.com \nConnecticu \nt Municipal ' \nElectric \nEnergy \nCooperativ \ne \n: \n' \n! \n: \nDave Meisinger \nChief Executive Officer \nCMEEC \n30 Stott Avenue \nNorwich, CONNECTICUT 06360' \ndmeisinger@cmeec.org \nConnecticu \nt Municipal \nElectric \nEnergy \nCooperativ \ne \nE Service\n \nSpiegel & McDiarmid LLP \n1818 N Street NW \n8th Floor \nWashington, DISTRICT OF \nCOLUMBIA 20036 \neservice@spiegelmcd.com \nConsolidate \nd Edison \nCompany \nof New \nYork, Inc. \nand Orange \nand \nRockland ' \nUtilities, \nInc. \nJoshua Kirstein \nSenior Attorney \nConsolidated Edison Company of \nNew York, Inc. \nConsolidated Edison Co. of New \nYork, Inc.  \n4 Irving Place-18th Floor \nNew York, NEW YORK 10003 \nUNITED STATES \nkirsteinj@coned.com \nJoshua A Kirstein \nSenior Attorney \nConsolidated Edison Company of \new York, Inc. \nConsolidated Edison Co. of New \nYork, Inc. \n4 Irving Place-18th Floor \nNew York, NEW YORK 10003 \nkirsteinj@coned.com \nConsolidate, \nd Edison \n' \nCompany \n' \nof New \nYork, Inc. ' \nand Orange \nand \n: \nRockland \n' \nUtilities, \n, \nInc. \nSebrina Greene \nAssociate General Counsel \nConsolidated Edison Company o f ,\nNew York, Inc. \n, \ni \n4 Irving Place \ni \nNew York, NEW YORK 10003 \nUNITED STATES \n' \n' \ngreenes@coned.com \nSebrina M. Greene \nAssociate General Counsel \nConsolidated Edison Company of \nNew York, Inc. \n4 Irving Place \nNew York, NEW YORK 10003 \ngreenes@coned.com\n \nConsolidate, \nd Edison \nCompany \n' NEELAM GALE-AHMAD \nParalegal \nCon Edison Company of New \n- 16 - \n458 of 515"},{"page":168,"startToken":62543,"endToken":62725,"text":"of New \nYork, Inc. \nand Orange \nand \nRockland \nUtilities, \nInc. \nYork \n4 IRVING PL \nW YORK, NEW YORK 10003 \ngaleahmadn@coned.com \nConsolidate \nd Edison \nCompany \nof New \nYork, Inc. \nand Orange \nand \nRockland \nUtilities, \nInc. \nConsolidate \nd Edison \nCompany \nof New \n(York, Inc. \nand Orange \nand \nRockland \nUtilities, \nInc. \nDana Lazarus \nDirector \nCon Edison Company of New \nYork \n4 Irving Place \nNew York, NEW YORK 10003 \nlazarusd@coned.com \nDavid C Burns \nProject Manager \nConsolidated Edison Company of \nNew York, Inc. \nConsolidated Edison Co. of New \nYork, Inc. \n4 Irving Place-18th Floor \nNew York, NEW YORK 10003 \nburnsd@coned.com \nChristopher Wilson \nDirector, Fed. Regulatory A \n250 Massachusetts Avenue NW \nSuite 760 \nWashington, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nFERCe-\nfilingsl@Constellation.com \nCarrie I-I Allen \nSVP & Deputy General Counsel \n101 Constitution Ave. NW Suite \n400 East \nWashington, DISTRICT OF \nCOLUMBIA 20001 \ncarrie.allen@constellation.com \nConstellati \non Energy \nGeneration, \nLLC \nConstellati \non Energy \nPaul Wight \nDLA Piper LLP (US) \n,Seth T. Lucia \nAssistant General Counsel \n- 17 - \nCase: 26-3621 \nDocument: 1-1 \nPage: 459 \nDate Filed: 10/16/2026 \n459 of 515"},{"page":169,"startToken":62725,"endToken":62911,"text":"Case: 26-3621. Document: 1-1 \nPage: 460 \nDate Filed: 10/16/2026 \nGeneration, \nLLC \n; \nI \n500 Eighth St, NW \n= \nWashington, DISTRICT OF \n# \nCOLUMBIA 20004 \nUNITED STATES \ni \npaul.wight@us.dlapiper.com\n! , \n250 Massachusetts Avenue, NW \nSuite 760 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nSeth.Lucia@constellation.com \nRachael Moore \nSenior Attorney \nConsumers , \nEnergy \nConsumers Energy Company \nOne Energy Plaza \nCompany \nJackson, MICHIGAN 49201 \n. UNITED STATES \nrachael.moore@cmsenergy.com \n.... \n...;._  \nWill Hild \nExecutive Director \nConsumers' Research \nConsumers' 1801 F St NW \nResearch \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \ninfo@consumersresearch.org  \nKatie Guerry \nSVP Regulatory Affairs \nConvergent ; Convergent Energy and Power LP \nEnergy and ! 7 TIMES SQ \nPower LP ! NEW YORK, NEW YORK 10036 \n; UNITED STATES \n.i kg!.ierry@convergentep.com \nMatthew Rudolphi \nJoshua E. Adrian \nThompson Coburn LLP \nAttorney \n1909 K Street, N.W. \ni Thompson Coburn LLP \nI Cooperativ Suite 600 \n1909 K Street NW \ne Energy \ni Washington, DISTRICT OF \nSuite 600 \nCOLUMBIA 20006 \nWASHINGTON, DISTRICT OF \nUNITED STATES \n; COLUMBIA 20006 \nmrudolphi@thompsoncoburn.com \njadrian@thompsoncoburn.com\n \nCooperativ \ne Energy \nNathan T Bellville \nRegulatory Affairs Specialist \nSouth Mississippi Electric Power \n..._„; ..._ \n \n-18-\n460 of 515"},{"page":170,"startToken":62911,"endToken":63082,"text":"Cordelio \nServices \nLLC \nAssociation \nPO BOX 15849 \nHATTIESBURG, MISSISSIPPI \n39404 \nnbellville@cooperativeenergy.co \nm \nGregory Jones \nPaul Hastings LLP \n1101 New York Avenue, NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \ngjones@milbank.com \nLily Hunter \nMilbank LLP \n1101 New York Avenue, NW \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nlhunter@milbank.com \nSophia Faram \nPaul Hastings LLP \n2050 M St NW \nWashington, DISTRICT OF \nCOLUMBIA 20036 \nsophiafaram@paulhastings.com \nCordelio \nServices \nLLC \nCordelio \nServices \nLLC \nLuke Pangman \nGeneral Counsel \nCordelio Power \n100 King St West, Suite 7000 \nToronto, ONTARIO M5X 1A9 \n1pangman@cordeliopower.com \nCliff Sikora \nEarthrise Energy, PBLLC \n3033 WILSON BLVD STE 700 \nARLINGTON, VIRGINIA 22201 \nUNITED STATES \ncliff.sikora@earthriseenergy.com \nAaron Tinjum \nData Center Coalition \n525-K East Market Street \n#253 \nLeesburg, VIRGINIA 20176 \nUNITED STATES \naaron@datacentercoalition.org \nMorgan A Sipple, ESQ \nData Center Coalition \n1250 H ST NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nmorgan@datacentercoalition.org \nData \nCenter \nCoalition \nCrete \nEnergy \nVenture, \nLLC \nCase: 26-3621 \nDocument: 1-1 \nPage: 461 \nDate Filed: 10/16/2026 \n- 19 - \n461 of 515"},{"page":171,"startToken":63082,"endToken":63275,"text":"Case: 26-3621 - Document: 1-1 \nPage: 462 \nDate Filed: 10/16/2026 \nData \nCenter \nCoalition \n{ \n- \n, , \nCy McNeill \nData Center Coalition \n525 K-East Market, Street #253 \n1Leesburg, VIRGINIA 20175 \ncy@datacentercoalition.org _ _ \nI \nDelaware \nMunicipal \nElectric \nCorporatio \nn, Inc. \nThomas Rudebusch \n; \nPartner \nDuncan, Weinberg, Genzer & \nPembroke PC \n1667 K Street, NW \nSuite 700 \nWashington, DISTRICT OF \n, \nCOLUMBIA 20006 \n' \nUNITED STATES \ntlr@dwgp.com \nLinda L. Murray-Kimball \nLegal Assistant \nDuncan, Weinberg, Genzer & \nPembroke PC \n1667 K Street, NW \nSuite 700 \nWashington, DISTRICT OF \nCOLUMBIA 20006-1654 \nlmk@dwgp.com \nDelaware \nMunicipal \nElectric \nCorporatio \nn, Inc. \nBhaveeta Mody \nDuncan, Weinberg, Genzer & \nPembroke PC \n1667 K Street, N.W. \nSuite 700 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \nbkm@dwgp.com \n_ \nKimberly Schlichting \nDelaware Municipal Electric \nCorporation, Inc. \n22 Artisan Drive \nSmyrna, DELAWARE 19977 \nkschlichting@demecinc.net \n- \n- \nDelaware \nPublic \nService \nCommissio , \nn \n' \nMatthew Hartigan \nDelaware Public Service \nCommission \n861 Silver Lake Blvd. \nSuite 100 \nDover, DELAWARE 19904 \nUNITED STATES \nmatthew.hartigan@state.de.us \nDelmarva \n \nPower & \n\" \nLight \nCompany \nCarlos Isaac \nAssistant General Counsel \nExelon Corporation \n10 S. Dearborn Street \nChicago, ILLINOIS 60603 \n: \nStan Berman \n3502 Fremont Ave N, #1 \nSeattle, WASHINGTON 98103 \nstan@bermlaw.com \n-20-\n462 of 515"},{"page":172,"startToken":63275,"endToken":63477,"text":"UNITED STATES \ncarlos.isaac@exeloncorp.com \nBrian Caldwell \nSenior Assistant Attorney Gene \nOffice of the Attorney General for \nthe District of Columbia \n400 6TH ST NW FL 9 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nbrian.caldwell@dc.gov \nShilpa Sadhasivam \n400 6TH ST NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nshilpa.sadhasivam@dc.gov \nDISTRICT \nOF \nCOLUMBI \nA \nWesley Walker \nSenior Assistant General Couns \nDominion Companies \nPO Box 25615 \nRichmond,VIRGINIA 23260-5615 \nUNITED STATES \nwesley.walker@dominionenergy.c \nom \nJacqulynn B. Hugee \nDeputy General Counsel \nDominion Energy Services, Inc. \n120 Tredegar Street \nRichmond, VIRGINIA 23219 \n'acqulynn.b.hugee@dominionener \ngy.com \nDominion \nEnergy \nServices, \nInc. \nJames G Davis \nRegulatory and Market Policy S \nDominion Energy & Dominion \nGeneration \n120 TREDEGAR ST \nRIVERVIEW \nRICHMOND, VIRGINIA 23219 \njames.g.davis@dominionenergy.c \nom \nDominion \nEnergy \nServices, \nInc. \nAndrea Hayden \nOffice of the General Counsel \nDTE Electric Company \nOne Energy Plaza \n1635 WCB \nDetroit, MICHIGAN 48226 \nUNITED STATES \nandrea.hayden@dteenergy.com \nTristin Rojeck \nRegulatory Strategy Consultant \nDTE Energy Company \n1 ENERGY PLZ \nDETROIT, MICHIGAN 48226 \ntristin.rojeck@dteenergy.com \nDTE \nElectric \nCompany \nDuke \nEnergy \nLeah Buchanan \nDuke Energy eTariff Account \nCase: 26-3621 \nDocument: 1-1 \nPage: 463 \nDate Filed: 10/16/2026 \n-21-\n463 of 515"},{"page":173,"startToken":63477,"endToken":63631,"text":"Case: 26-3621 _ Document: 1-1 \nPage: 464 \nDate Filed: 10/16/2026 \nKentucky, \nInc. \n, 550 South Tryon Street \n' Charlotte, NORTH CAROLINA \n128202 \ne-tariff@duke-energy.com \nDuke \nEnergy \nOhio, Inc. \nSheri May \n! Associate General Counsel \n139 E. 4th Street, 1212-M \n' Cincinnati, OHIO 45202 \n' sheri.may@duke-energy.com \nDuquesne \nLight \nCompany \nMichael Brechlin \n411 7th Ave \nPittsburgh, PENNSYLVANIA \n15219 \nmbrechlin@duqlight.com \nDuquesne \nLight \nCompany \nTishekia Williams \nDirector of External Affairs a \n411 Seventh Avenue \n15th Floor \nPittsburgh, PENNSYLVANIA \n15219 \nUNITED STATES \ntwilliams@duqlight.com \n' \nEARTHJU  \nSTICE \n' \nAaron Stemplewicz \nSenior Attorney \nEARTHJUS TICE \nClean Energy Program \n1617 John F. Kennedy Blvd \nSuite 2020 \nPhiladelphia, PENNSYLVANIA \n19103 \nUNITED STATES \nastemplewicz@earthjustice.org \n. \n. \n. \nEast \nKentucky \n, \nPower\n' \nCooperativ ! , \ne, Inc. \n' \nDaniel Frank \nPartner \nEversheds Sutherland (US) LLP \n700 Sixth Street, N.W. \nSuite 700 \nWashington, DISTRICT OF \n, \n' Denise R Foster Cronin \nVice President, Federal and RT \n; East Kentucky Power \n' Cooperative, Inc. \n4775 LEXINGTON ROAD \nLEXINGTON, KENTUCKY \n-22-\n464 of 515"},{"page":174,"startToken":63631,"endToken":63787,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 465 \nDate Filed: 10/16/2026 \nCOLUMBIA 20001-3980 \nUNITED STATES \nDanielFrank@eversheds-\nsutherland.corn \n40392 \ndenise.cronin@ekpc.coop \nAllison Salvia \nEversheds Sutherland (US) LLP \n700 Sixth Street, NW \nSuite 700 \nWashington, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nAllisonSalvia@eversheds-\nsutherland.corn \nEast \nKentucky \nPower \nCooperativ \ne, Inc. \nKelly Cuthbertson \nAssociate \nEversheds Sutherland (US) LLP \n700 Sixth Street, NW \nSuite 700 \nWashington, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nkellycuthbertson@eversheds-\nsutherland.com \nEast \nKentucky \nPower \nCooperativ \ne, Inc. \nAllison Salvia \n700 Sixth Street, NW \nSuite 700 \nWashington, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nAllisonSalvia@eversheds-\nsutherland.com \nDenise R Foster Cronin \nVice President, Federal and RT \n4775 LEXINGTON ROAD \nLEXINGTON, KENTUCKY \n40392 \ndenise.cronin@ekpc.coop \nEast \nKentucky \nPower \nCooperativ \ne, Inc. \nF. Alvin Taylor \nAttorney \nMcCarter & English, LLP \n1301 K Street, NW \nSuite 1000 West \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nEast Texas \nElectric \nCooperativ \ne, Inc. \n-23-\n465 of 515"},{"page":175,"startToken":63787,"endToken":63949,"text":"Case: 26-3621_ \nDocument: 1-1 \nPage: 466 \nDate Filed: 10/16/2026 \nUNITED STATES \nataylor@mccarter.com \n......._ \nEDF \n, : \nRenewable I\n \ns, Inc. \nLinda Walsh \nHusch Blackwell LLP \n, \n1801 Pennsylvania Ave. NW, Suite \n1000 \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \nlinda.walsh@huschblackwell.com \nCorban A. Coffman\n \nin Gump Strauss Hauer & Feld i \nLLP \n2001 K Street N.W. \n Washington, DISTRICT OF \nCOLUMBIA 20006 \nccoffman@akingump.com \n.. ... . . \nEDF \nRenewable \ns, Inc. \n. \nMichael Blackwell \nAttorney \nHusch Blackwell LLP \n10700 VALLEY DR \nCARMEL, INDIANA 46280 \nmichael.blackwell@huschblackwe \nll.com \nEDF \nRenewable , \ns, Inc. \n' \nEmma Simon \nDirector, Transmission Policy \nEDF Renewables Development, \nInc. \n15445 Innovation Dr \nSan Diego, CALIFORNIA 92128 \nemmanix.simon@edf-re.com \nEDF \nRenewable ! \ns, Inc. \nTemujin J Roach \nSenior Director - Transmission \nEDF Renewables, Inc. \n400\n3600 American Blvd., W, Suite \nMinneapolis, MINNESOTA \n55413 \ntemujin.roach@edf-re.corn \n____ _...._.. _ _ .... ___ ..___. \nEDF \nRenewable ; \ns, Inc. \nAnton Ptak \nDirector, Transmission and Int \nEDF Renewables, Inc. \n3600 AMERICAN BLVD W STE \n400 \nBLOOMINGTON, MINNESOTA \n-24-\n466 of 515"},{"page":176,"startToken":63949,"endToken":64101,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 467 \nDate Filed: 10/16/2026 \n55431 \nanton.ptak@edf-re.com \nKevin Huyler \nManaging Director, Edison Elec \nEdison Electric Institute \n701 PENNSYLVANIA AVE NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20004 \nUNITED STATES \nkhuyler@eei.org \nChristopher M Randall \nEdison Electric Institute \nEdison Electric Institute \n701 Pennsylvania Avenue, NW \nWashington, DISTRICT OF \nCOLUMBIA 20004 \ncrandall@eei.org \nEdison \nElectric \nInstitute \nNancy Bagot \nSenior Vice President \nElectric Power Supply Association \n1401 New York Avenue, NW \nSuite 950 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nNancyB@epsa.org \nNancy Bagot \n1401 NEW YORK AVE NW STE \n950 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nnbagot@epsa.org \nElectric \nPower \nSupply \nAssociation \nElectric \nPower \nSupply \nAssociation \nKaren Onaran \nVice President \nELCON \n1101 K Street NW \nSuite 700 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nKOnaran@elcon.org \nElectricity \nConsumers \nResource \nCouncil \nElectricity \nConsumers  \nKaren Onaran \nVice President \nELCON \n-25-\n467 of 515"},{"page":177,"startToken":64101,"endToken":64307,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 468 \nDate Filed: 10/16/2026 \nResource \n: \nCouncil \n1101 K Street NW \n Suite 700 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nKOnaran@elcon.org \nEnchanted \nRock, LLC \nSteven Shparber \nMintz, Levin, Cohn, Ferris, \nGlovsky and Popeo, P.C. \nJoel Yu \nDirector of Regulatory & Legis \nEnchanted Rock, LLC \n1113 VINE ST STE 101 \nHOUSTON, TEXAS 77002 \njyu@enchantedrock.com \n555 12TH ST NW S FE 1100 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20004 \nUNITED STATES \nsshparber@mintz.com \nEnchanted \nRock, LLC \nOmar Bustami \nMintz, Levin, Cohn, Ferris, \nGlovsky and Popeo, P.C. \n3580 Carmel Mountain Road \nSuite 300 \nSan Diego, CALIFORNIA 92130 \nUNITED STATES \nOBustami@mintz.com \nJames Huang \nDirector, Wholesale Markets Po \n1113 Vine Street \nSuite 101 \nHouston, TEXAS 77002 \njhuang@erock.com \nEnerwise \nGlobal \nTechnologi \nes, LLC \ndba \nCPower \nAaron Breidenbaugh \nCPower Energy Management \nCPower, Inc. \n64 Westview Rd \nVoorheesville, NEW YORK 12186 \nUNITED STATES \naaron.breidenbaugh@cpowerenerg \nymanagement.com\n, agement.com\n \nNancy Chafetz \nSenior Director, Regulatory an \nLS POWER CORPORATION \n1001 Fleet St Unit 400 \nBaltimore, MARYLAND 21202 \nnancy.chafetz@cpowerenergyman \nEnerwise \nGlobal \nTechnologi \nes, LLC \ndba \nCPower \nKenneth D Schisler \nRegulatory Affairs \nCPower, Inc. \n7604 Cooper Point Rd \nBozman, MARYLAND 21612 \nKenneth.Schisler@CPowerEnergy \nManagement.com \n-26-\n468 of 515"},{"page":178,"startToken":64307,"endToken":64459,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 469 \nDate Filed: 10/16/2026 \nSarah Bresolin Silver \nVice President \nENGIE North America Inc. \n1360 Post Oak Blvd \nHouston, TEXAS 77056 \nUNITED STATES \nsarah.bresolin@engie.com \nTed Kelly \nSenior Attorney \nEnvironmental Defense Fund \n1875 Connecticut Ave NW Suite \n600 \nWashington, DISTRICT OF \nCOLUMBIA 20012 \nUNITED STATES \ntekelly@edf.org \nEric Stoutenburg \nEolian, L.P. \n988 Howard Ave Ste \nEolian, L.P. Burlingame, CALIFORNIA 94010 \nUNITED STATES \neric.stoutenburg@eolianenergy.co \nm \nBruce Grabow \nSheppard Mullin Richter & \nHampton LLP \n2099 Pennsylvania Avenue, NW \nEolian, LP Suite 100 \nWashington, DISTRICT OF \nCOLUMBIA 20006-6801 \nUNITED STATES \nbgrabow@sheppard.com \nENGIE \nNorth \nAmerica \nInc. \nEnvironme \nntal \nDefense \nFund \n1 \nBrian Zimmet \nPartner \n1 THOMAS CIR NW \nROCK CREEK ENERGY \nGROUP, LLP \nWASHINGTON, DISTRICT OF  \nMarica Sharashenidze \nRock Creek Energy Group, LLP \n1 Thomas Circle \nSuite 700 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nEssential \nPower \nOPP, LLC \n- 27 - \n469 of 515"},{"page":179,"startToken":64459,"endToken":64629,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 470 \nDate Filed: 10/16/2026 \nCOLUMBIA 20005 \n; \nUNITED STATES \n: \nbzimmet@rockcreekenergygroup.c \nom \nmsharashenidze@rockcreekenergy \ngroup.com \nEssential \nPower \nOPP, LLC \n' \n' \nGeorge Knapp \nGeneral Counsel \n13860 Ballantyne Corporate Place \nSuite 300 \nCharlotte, NORTH CAROLINA \n28277 \nGeorgeKnapp@cogentrix.com\n \nEssential \nPower \nOPP, LLC \nStephanie C Kueffner ESQ \nAssociate General Counsel \nCogentrix Energy Power \nManagement, LLC \n13860 BALLANTYNE \nCORPORATE PL STE 300 \nCHARLOTTE, NORTH \nCAROLINA 28277 \nstephaniekueffner@cogentrix.com \nEssential \n' \nPower \nRock \nSprings, \nLLC \n;om \nBrian Zimmet \nPartner \n1 THOMAS CIR NW \n,' \nROCK CREEK ENERGY \ni \n' \nGROUP, LLP \nWASHINGTON, DISTRICT OF  \nCOLUMBIA 20005 \n, \nUNITED STATES \nbzimmet@rockcreekenergygroup.c ! \nGeorge Knapp \nGeneral Counsel \n13860 Ballantyne Corporate Place \nSuite 300 \nCharlotte, NORTH CAROLINA \n28277 \nGeorgeKnapp@cogentrix.com\n \n: \nEssential  \nPower \ni \nRock \nSprings,  \nLLC \n!COLUMBIA \nLynn Kirshbaum \n1 Thomas Circle NW \n' \nSuite 700 \ni \nWashington, DISTRICT OF \n20005 \n: \nUNITED STATES \n; \nlkirshbaum@rockcreekenergygrou \np.com\n, \nHaley M. Franco \nEnergy Regulatory Advisor \n_ \n1 Thomas Circle NW \nSuite 700 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nhfranco@rockcreekenergygroup.c \nom \n-28-\n470 of 515"},{"page":180,"startToken":64629,"endToken":64809,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 471 \nDate Filed: 10/16/2026 \nBrian Zimmet \nPartner \nMarica Sharashenidze \nEssential \n1 THOMAS CIR NW \nRock Creek Energy Group, LLP \nPower \nROCK CREEK ENERGY \n1 Thomas Circle \nRock \nSprings,\nGROUP, LLP \nWASHINGTON, DISTRICT OF \nSuite 700 \nWashington, DISTRICT OF \nLLC \n \nCOLUMBIA 20005 \nUNITED STATES \nCOLUMBIA 20005 \nmsharashenidze@rockcreekenergy \nbzimmet@rockcreekenergygroup.c \nom \ngroup.com \nGeorge Knapp \nGeneral Counsel \n13860 Ballantyne Corporate Place \nSuite 300 \nCharlotte, NORTH CAROLINA \n28277 \nGeorgeKnapp@cogentrix.com \nStephanie C Kueffner ESQ \nAssociate General Counsel \nCogentrix Energy Power \nManagement, LLC \n13860 BALLANTYNE \nCORPORATE PL STE 300 \nCHARLOTTE, NORTH \nCAROLINA 28277 \nstephaniekueffner@cogentrix.com \nEssential \nPower \nRock \nSprings, \nLLC \nEssential \nPower \nRock \nSprings, \nLLC \nMax Minzner \nSVP and Deputy General Counsel \nExelon BSC-Legal Regulatory \n701 9TH ST NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nmax.minzner@exeloncorp.com \nCarlos Isaac \nAssistant General Counsel \nExelon Corporation \n10 S. Dearborn Street \nJordan Kwok \nDirector, Federal Regulatory A \nExelon Business Services \n701 9TH ST NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \njordan.kwok@exeloncorp.com \nExelon \nCorporatio \nn \nExelon \nCorporatio \nn \n-29-\n471 of 515"},{"page":181,"startToken":64809,"endToken":64979,"text":"-Case: 26-3621 \nDocument: 1-1 \nPage: 472 \nDate Filed: 10/16/2026 \nChicago, ILLINOIS 60603 \nUNITED STATES \ncarlos.isaac@exeloncorp.com \nExelon \nCorporatio \nn \nAlejandro Bautista \nAssistant General Counsel \nExelon Business Services \nCompany, LLC \n2301 Market Street \nPhiladelphia, PENNSYLVANIA \n19101 \nalejandro.bautista@exeloncorp.co \nm \nFirstEnergy \nService \nCompany \nAmanda Parker \nAttorney \nFirstEnergy Service Company \n76 South Main Street \nAkron, OHIO 44308 \nTricia S Hartzell \nFirstEnergy Legal Specialist \nFirstEnergy Service Company \n76 S. Main Street \n15th Floor \nAkron, OHIO 44308 \nthartzell@firstenergycorp.com \nUNITED STATES \naparker@firstenergycorp.com \nFirstEnergy \nService \n' \nCompany \nMorgan Parke \nAssociate General Counsel \nFirstEnergy \n341 White Pond Dr. \nAkron, OHIO 44320 \nUNITED STATES \nmparke@firstenergycorp.com \nI \nGoogle \n' \nEnergy \n' \nLLC  \nJane Rueger \nPerkins Coie LLP \n, \n700 13th Street, N.W. \n! \nSuite 800 \n, \nWashington, DISTRICT OF \n; \nCOLUMBIA 20005-3960 \n: \nUNITED STATES \n, \njane.rueger@ashurstperkins.com \nBrian D George \nGoogle LLC \n25 MASSACHUSETTS AVE NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nbriangeorge@google.com \nGoogle \nEnergy \nLLC \n, \n, \nJacob Neeley \nAttorney \nAshurst Perkins Coie US LLP \n33 E Main Street \n-- ----- - - - \n- \n-30-\n472 of 515"},{"page":182,"startToken":64979,"endToken":65148,"text":"Hamilton \nLiberty \nLLC \nStephanie C Kueffner ESQ \nAssociate General Counsel \nCogentrix Energy Power \nSuite 201 \nMadison, WISCONSIN 53703 \njacob.neeley@ashurstperkins.com \nJane Rueger \nPerkins Coie LLP \n700 13th Street, N.W. \nSuite 800 \nWashington, DISTRICT OF \nCOLUMBIA 20005-3960 \nUNITED STATES \njane.rueger@ashurstperkins.com \nBrian D George \nGoogle LLC \n25 MASSACHUSETTS AVE NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nbriangeorge@google.com \nGoogle \nLLC \nJacob Neeley \nAttorney \nAshurst Perkins Coie US LLP \n33 E Main Street \nSuite 201 \nMadison, WISCONSIN 53703 \n'acob.neeley@ashurstperkins.com \nGoogle \nLLC \nBrian Zimmet \nPartner \n1 THOMAS CIR NW \nROCK CREEK ENERGY \nGROUP, LLP \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nbzimmet@rockcreekenergygroup .c \nom \nMarica Sharashenidze \nRock Creek Energy Group, LLP \n1 Thomas Circle \nSuite 700 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nmsharashenidze@rockcreekenergy \ngroup.com \nHamilton \nLiberty \nLLC \nGeorge Knapp \nGeneral Counsel \n13860 Ballantyne Corporate Place \nSuite 300 \nCharlotte, NORTH CAROLINA \n28277 \nGeorgeKnapp@cogentrix.com \nHamilton \nLiberty \nLLC \nCase: 23-3621 \nDocument: 1-1 \nPage: 473 \nDate Filed: 10/16/2026 \n-31-\n473 of 515"},{"page":183,"startToken":65148,"endToken":65293,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 474 \nDate Filed: 10/16/2026 \nManagement, LLC\n \n13860 BALLANTYNE \nCORPORATE PL STE 300 \nCHARLOTTE, NORTH \nCAROLINA 28277 \nstephaniekueffner@cogentrix.com \nHamilton \nPatriot \nLLC \nBrian Zimmet \nPartner \n1 THOMAS CIR NW \nROCK CREEK ENERGY \nGROUP, LLP \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nbzimmet@rockcreekenergygroup.c \nom \nMarica Sharashenidze \nRock Creek Energy Group, LLP \n1 Thomas Circle \nSuite 700 \nWashington, DISTRICT OF \n' COLUMBIA 20005 \nmsharashenidze@rockcreekenergy \ngroup.com \nHamilton \nPatriot \nLLC \nGeorge Knapp \nGeneral Counsel \n13860 Ballantyne Corporate Place \nSuite 300 \nCharlotte, NORTH CAROLINA \n28277 \nGeorgeKnapp@cogentrix.com \nHamilton \nPatriot \nLLC \nStephanie C Kueffner ESQ \nAssociate General Counsel \nCogentrix Energy Power \nManagement, LLC \n. 13860 BALLANTYNE \n CORPORATE PL STE 300 \nCHARLOTTE, NORTH \nCAROLINA 28277 \nstephaniekueffner@cogentrix.com ' \nHudson \nTransmissi \non Partners, \nLLC \nWilliam Hollaway \nGibson, Dunn & Crutcher LLP \n1050 Connecticut Ave NW \nWashington, DISTRICT OF \nCOLUMBIA 20036 \n-32-\n474 of 515"},{"page":184,"startToken":65293,"endToken":65488,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 475 \nDate Filed: 10/16/2026 \nUNITED STATES \nWHollaway@gibsondunn.com \nEdward Stern \nPresident and CEO \nGibson, Dunn & Crutcher LLP \n501 Kings Highway East, Suite 300 \nFairfield, CONNECTICUT 06825 \nUNITED STATES \nestern@powerbridge.us \nHudson \nTransmissi \non Partners, \nLLC \nLisa O'Hara \nCorporate Counsel \nIdaho Power Company \nPO Box 70 \nBOISE,IDAHO \nUNITED STATES \nlo'hara@idahopower.com \nKimberly Janas \nOffice of the Illinois Attorney \nGeneral \n115 S LA SALLE ST \nCHICAGO, ILLINOIS 60603 \nUNITED STATES \nkimberly.janas@ilag.gov \nIdaho \nPower \nCompany \nScott Metzger \nOffice of the Illinois Attorney \nGeneral \n115 S LA SALLE ST \n25TH FLOOR \nCHICAGO, ILLINOIS 60603 \nscott.metzger@ilag.gov \nIllinois \nAttorney \nGeneral's \nOffice \n'Susan L. Satter \nChief, Public Utilities Bureau \nOffice of the Illinois Attorney \nGeneral \n115 S LA SALLE ST \nCHICAGO, ILLINOIS 60603 \nsusan.satter@ilag.gov \nIllinois \nAttorney \nGeneral's \nOffice \nEric DeBellis \nIllinois Citizens Utility Board \n309 W WASHINGTON ST STE \n800 \nCHICAGO, ILLINOIS 60606 \nUNITED STATES \nedebellis@citizensutilityboard.org \nClara Summers \nConsumers for a Better Grid Ca \nCitizens Utility Board of Illinois \n309 W WASHINGTON ST STE \n800 \nCHICAGO, ILLINOIS 60606 \ncsummers@citizensutilityboard.or \ng \nIllinois \nCitizens \nUtility \nBoard \n- 33 - \n475 of 515"},{"page":185,"startToken":65488,"endToken":65671,"text":"-Case: 26-3621 \nDocument: 1-1 \nPage: 476 \nDate Filed: 10/16/2026 \nIllinois \n' \nMunicipal \nElectric \n, \nAgency \nTroy Fodor \nVice President General Counsel \nIllinois Municipal Electric Agency \n3400 Conifer Drive \nSpringfield, ILLINOIS 62711 \nUNITED STATES \ntfodor@imea.org \n..._   \nIllinois \nMunicipal \nElectric \nAgency \nDaniel Chung \nStaff Attorney \nIllinois Municipal Electric Agency \n3400 Conifer Drive \nSpringfield, ILLINOIS 62711 \nUNITED STATES \ndchung@imea.org \n. \nIndiana \nMichigan \nPower \nCompany \nStacey Burbure \nSVP, Transmission Regulatory \nEngagement & Compliance \n8500 Smiths Mill Road, 4th Floor \nNew Albany, OHIO 43054 \nUNITED STATES \nslburbure@aep.com \nJessica A. Cano \nAssoc.Gen.Counsel Regul. East \n1 Riverside Plaza \nColumbus, OHIO 43215-2372 \njacano@aep.com \nIndiana \nOffice of \nUtility \nConsumer \nCounselor ; \nI \nArthur Iler \nDeputy Consumer Counsel - Fede \nIndiana Office of Utility Consumer ' \nCounselor \n115 W Washington St \nSte 1500 South \nIndianapolis INDIANA 46204 \nUNITED STATES \nailer oucc.in.gov \nSouth\n, \nScott Jones\nIndiana Office of the Utility\n \nIndiana Office of Utility \nConsumer Counselor \n115 West Washington St. Ste.1500, \nIndianapolis, INDIANA 46204 \nsjonesl@oucc.in.gov \n, \nIndividual \nBruce Campbell \nPrincipal \nEnerwise Global Technologies, \nLLC \n9204 2ND AVE \nSILVER SPRING, MARYLAND \n20910 \n-34-\n476 of 515"},{"page":186,"startToken":65671,"endToken":65858,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 477 \nDate Filed: 10/16/2026 \n   \n   \n \n \n  \n \n \n  \n \n  \n  \n \n \n \n   \n \nUNITED STATES \nbruce@campbellea.com \n \n \n  \n \n  \n \n \n \n \n \n  \nIndustrial \nEnergy \nConsumers \nof America \n \nKenneth Stark \nMcNees Wallace & Nurick LLC \n100 Pine Street \nP.O. Box 1166 \nHarrisburg, PENNSYLVANIA \n17108 \nUNITED STATES \nkstark@mcneeslaw.com \n \n  \n \n  \n \n \n \n \n \n   \n \n \n  \n \n  \n \n \n \n \n \n  \nInternation \nal \nTransmissi \non \nCompany \n \nLauren Parrottino \nAssociate Attorney \nITC Holdings Corp. \n27175 ENERGY WAY \nNOVI, MICHIGAN 48377 \nUNITED STATES \n1parrottino@itctransco.com \n \n  \n \n  \n \n \n \n \n \n  \n \n \n  \n \n  \n \n \n \n \n \n   \n \n \n  \n \n  \n \n \n \n \n \n  r \n  Tyler O'Connor \nCrowell & Moring LLP \n600 5TH ST NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \ntoconnor@crowell.com \nWilliam Borders \nChief Compliance Officer \nInvenergy LLC \nOne South Wacker Drive \nSuite 1500 \nChicago, ILLINOIS 60606 \nUNITED STATES \nferccompliance@invenergy.com \n \n  \n \n  \n \n \n \n \n \n  Invenergy \nRenewable \ns LLC \n  \n \n \nKathryn Douglass \nCrowell & Moring LLP \n1601 Wewatta Street \nSte. 815 \nDenver, COLORADO 80202 \nkdouglass@crowell.com \n \n \n  \n  \n \n \n \n \n   \n  \n \n  \n \n  \n \n \n \n \n \n  \nInvenergy \nRenewable \ns LLC \n  \n \n \nNicole Luckey \nSenior Vice President, Regulat \nInvenergy LLC \n1 S WACKER DR STE 1800 \nCHICAGO, ILLINOIS 60606 \nnluckey@invenergy.com \n \n \n   \n  \n \n  \n \n  \n \n \n \n \n \n   \n  \n \n  \n \n  \n \n \n \n \n \n   \n   \n \n \n  \n \n \n  \n \n  \n \n \n \n \n \n  \nInvenergy \nThermal \nLLC \n  \nTyler O'Connor \nCrowell & Moring LLP \n600 5TH ST NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \n \nKathryn Douglass \nCrowell & Moring LLP \n1601 Wewatta Street \nSte. 815 \nDenver, COLORADO 80202 \nkdouglass@crowell.com \n \n \n   \n   \n \n \n  \n \n \n  \n \n  \n \n \n \n \n \n   \n   \n \n \n  \n \n \n  \n \n  \n \n \n \n \n \n   \n   \n \n \n  \n \n \n  \n \n  \n \n \n \n \n \n   \n   \n \n \n  \n \n \n  \n \n  \n \n \n \n \n \n- 35 - \n477 of 515"},{"page":187,"startToken":65858,"endToken":66066,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 478 \nDate Filed: 10/16/2026 \nUNITED STATES \ntoconnor@crowell.com \nInvenergy \nThermal \nLLC \n' \n' \nWilliam Borders \nChief Compliance Officer \nInvenergy LLC \nOne South Wacker Drive \nSuite 1500 \nChicago, ILLINOIS 60606 \nUNITED STATES \nferccompliance@mvenergy.com \n, \ni \nNicole Luckey \nSenior Vice President, Regulat \nInvenergy LLC \n 1 S WACKER DR STE 1800 \nCHICAGO, ILLINOIS 60606 \nnluckey@invenergy.com \nJersey \nCentral \nPower & \nLight \nCompany \nAmanda Parker \nAttorney \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.com \nTricia S Hartzell \nFirstEnergy Legal Specialist \n76 S. Main Street \n15th Floor \nAkron, OHIO 44308 \nthartzell@firstenergycorp.com \nJersey \nCentral \nPower & \nLight \nCompany \nAmanda Parker \nAttorney \nFirstEnergy Service Company \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.corn \nTricia S Hartzell \nFirstEnergy Legal Specialist \nFirstEnergy Service Company \n76 S. Main Street \n15th Floor \nAkron, OHIO 44308 \nthartzell@firstenergycorp.com \nJersey \nCentral \nPower & \nLight \nCompany \nMorgan Parke \nAssociate General Counsel \nFirstEnergy \n341 White Pond Dr. \nAkron, OHIO 44320 \nUNITED STATES \nmparke@firstenergycorp.com \nKentucky \nPower \nCompany \n: \n' \n' \n, \nJohn Crespo \nDeputy General Counsel \n1 Riverside Plaza \n29th Floor \nColumbus, OHIO 43215 \nUNITED STATES \njccrespo aep.com \n' \n, \n, \nJennifer L. Key, ESQ \n1330 Connecticut Ave., N.W. \nWashington, DISTRICT OF \nCOLUMBIA 20036 \njkey@steptoe.com \n-36-\n478 of 515"},{"page":188,"startToken":66066,"endToken":66267,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 479 \nDate Filed: 10/16/2026 \n   \n  \n  \n \n \n \n \n \n  \nKeystone \nAppalachia \nn \nTransmissi \non \nCompany \n \nAmanda Parker \nAttorney \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.com \n \nDeborah L. Jacobson, ESQ \nAttorney \n341 WHITE POND DR \nAKRON, OHIO 44320 \ndjacobson@firstenergycorp.com \n   \n  \n  \n \n \n \n \n \n  \nKeystone \nAppalachia \nn \nTransmissi \non \nCompany \nAmanda Parker \nAttorney \nFirstEnergy Service Company \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.com \n \nTricia S Hartzell \nFirstEnergy Legal Specialist \nFirstEnergy Service Company \n76 S. Main Street \n15th Floor \nAkron, OHIO 44308 \nthartzell@firstenergycorp.com \n  \n \n  \n \n   \n  \n  \n \n \n \n \n \n  Keystone \nAppalachia \nTransmissi \non \nCompany \n Morgan Parke \nAssociate General Counsel \nFirstEnergy \n341 White Pond Dr. \nAkron, OHIO 44320 \nUNITED STATES \nmparke@firstenergycorp.com \n \n \n \n \n \n  \n \n \n \n \n \n \n  \n \n \n \n \n \n \n  \n \n \n \n \n \n \n  \nKingsport \nPower \nCompany \n \nRenee Hawkins \nAssistant Treasurer \n1 Riverside Plz \nColumbus, OHIO 43215 \nUNITED STATES \nrvhawkins@aep.com \nDebra Raggio \nExecutive Vice President, Head \nKlondike Digital Infrastructure \nLLC \n117 ORONOCO ST \nALEXANDRIA, VIRGINIA \n22314 \nUNITED STATES \ndraggio@newfortressenergy.com \n \nWilliam E. Johnson, ESQ \nSenior Counsel \n1 Riverside Plaza \n23rd Floor \nColumbus, OHIO 43061 \nwejohnson@aep.com \n  \nKlondike \nDigital \nInfrastructu \nre LLC \n \n \n \n \n \n \n   \n \n \n \n \n \n \n  \nLakewood \nCogenerati \non, LP \n \nBrian Zimmet \nPartner \n1 THOMAS CIR NW   \n \nMarica Sharashenidze \nRock Creek Energy Group, LLP \n1 Thomas Circle \n   \n  \n  \n \n \n \n \n \n   \n  \n  \n \n \n \n \n \n- 37 - \n479 of 515"},{"page":189,"startToken":66267,"endToken":66432,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 480 \nDate Filed: 10/16/2026 \n' \nROCK CREEK ENERGY \nGROUP, LLP \n' \nWASHINGTON, DISTRICT OF \n: \nCOLUMBIA 20005 \n; \nUNITED STATES \n' \nbzimmet@rockcreekenergygroup.c \nom \n Suite 700 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nmsharashenidze@rockcreekenergy \ngroup.com \nLakewood \nCogenerati \non, LP \nGeorge Knapp \nGeneral Counsel \n13860 Ballantyne Corporate Place \nSuite 300 \nCharlotte, NORTH CAROLINA \n28277 \nGeorgeKnapp@cogentrix.com \nLakewood \nCogenerati \non, LP \nStephanie C Kueffner ESQ \nAssociate General Counsel \nCogentrix Energy Power \nManagement, LLC \n13860 BALLANTYNE \nCORPORATE PL STE 300 \nCHARLOTTE, NORTH \nCAROLINA 28277 \nstephaniekueffner@cogentrix.com \nLarge \nPublic \n' \nPower \nCouncil \n' \nJonathan Schneider \n' \nStinson LLP \n' \n1775 Pennsylvania Avenue NW \nSuite 800 \n' \nWashington, DISTRICT OF \nCOLUMBIA 20006 \n: \nUNITED STATES \n; \njonathan.schneider@stinson.com \nJohn E. McCaffrey \nPartner \nStinson LLP \n1775 Pennsylvania Avenue NW \nSuite 800 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20006 \nohn.mccaffrey@stinson.com\n \nLarge \nPublic \nPower \nCouncil \n, \n_._ \nM. Denyse Zosa., ESQ \nStinson Leonard Street LLP \n1775 Pennsylvania Avenue NW \nSuite 800 \nWashington, DISTRICT OF \nCOLUMBIA 20006 \ndenyse.zosa@stinson.com \n-38-\n480 of 515"},{"page":190,"startToken":66432,"endToken":66619,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 481 \nDate Filed: 10/16/2026 \n  \n     \n \n \n   \n  \n \n \n  \n     \n \n \n   \n  \n \n \n  \n     \n \n \n   \n  \n \n \n \nLee County \nElectric \nCooperativ \ne, Inc. \n \nJohn Adragna \nMcCarter & English, LLP \n1301 K Street, NW \nSuite 1000 West \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nJadragna@mccarter.com \n \n  \nF. Alvin Taylor \nAttorney \nMcCarter & English, LLP \n1301 K Street, NW \nSuite 1000 West \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nataylor@mccarter.com \n \n \n  \n   \n \n  \n \n \n \nLee County \nElectric \nCooperativ \ne, Inc. \n   \n \n \n  \nClark Hawkins \nDirector - Electric Operations \n4980 Bayline Drive \nNorth Fort Myers, FLORIDA \n33917 \nClark .Hawkins @lcec.net \n \n  \n    \n \n \n \n   \n \n \n \n \n  \n    \n \n \n \n  \nSarah Bullock \nDirector Finance and Supply Ch \nLee County Electric Cooperative, \nInc. \n4980 BAYLINE DR \nNORTH FORT MYERS, \nFLORIDA 33917 \nsarah.bullock@lcec.net \n \n \nLee County \nElectric \nCooperativ \ne, Inc. \n   \n \n \n  \n \n  \n     \n \n \n  \n \n  \n     \n \n \n   \n  \n \n \n \nLincoln \nGenerating \nFacility, \nLLC \n \nCliff Sikora \nEarthrise Energy, PBLLC \n3033 WILSON BLVD STE 700 \nARLINGTON, VIRGINIA 22201 \nUNITED STATES \ncliff.sikora@earthriseenergy.com \nMarjorie Philips \nVP, Wholesale Market Policy \nLS Power Associates, L.P. \n250 W 55TH ST FL 31 \nNEW YORK, NEW YORK 10019 \nUNITED STATES \nmphilips@Ispower.com \n   \n \n \n \n \n  \n   \n   \n \n \n \n \n \nLS Power \nDevelopme \nnt, LLC \n \n   \n  \n \n \n  \n     \n \n \n   \n  \n \n \n \nLS Power \nDevelopme \nnt, LLC \n \nTom Hoatson \n1 Tower Center \nEast Brunswick, NEW JERSEY \n   \n  \n \n \n  \n     \n \n \n   \n  \n \n \n  \n     \n \n \n   \n  \n \n \n-39-\n481 of 515"},{"page":191,"startToken":66619,"endToken":66776,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 482 \nDate Filed: 10/16/2026 \n08816 \nUNITED STA'L'ES \nthoatson@lspower.com \n: \nLS Power  \nDevelopme ; \nnt, LLC  \nDaniel Pierpont \nVice President \nLS Power Development, LLC \n250 W 55TH ST FL 31 \nNEW YORK, NEW YORK 10019 \nUNITED STATES \ndpierpont@lspower.com \nMainspring \nEnergy \nBrian Kauffman \nDirector, Wholesale Market Dev \nMainspring Energy \n3601 HAVEN AVE \nMENLO PARK, CALIFORNIA \n94025 \nUNITED STATES \nbrian.kauffman@mainspringenergy \n.com \nMainspring \nEnergy \nBrian Kauffman \nDirector, Wholesale Market Dev \nMainspring Energy \n3601 HAVEN AVE \nMENLO PARK, CALIFORNIA \n94025 \nUNITED STATES \nbrian.kauffman@mainspringenergy \n.com \nMaryland \nOffice of\n' \nPeople's \n \nCounsel \nWilliam Fields \nDeputy People's Counsel \n6 SAINT PAUL ST STE 2102 \nBALTIMORE, MARYLAND \n' \n21202 \n \nUNITED STATES \nwilliam.fields@maryland.gov \nPhilip L Sussler \nSenior Assistant People's Coun \nMaryland Office of People's \nCounsel \n6 SAINT PAUL ST STE 2102 \nBALTIMORE, MARYLAND \n21202\n. \npluhp.sussler@maryland.gov \nMaryland \nOffice of \ni Alexis H Lewis, ESQ \nAssistant People's Counsel \n-40-\n482 of 515"},{"page":192,"startToken":66776,"endToken":66962,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 483 \nDate Filed: 10/16/2026 \nOffice of People's Counsel \n6 SAINT PAUL ST \nBALTIMORE, MARYLAND \n21202 \nalexis.lewis@maryland.gov \nPeople's \nCounsel \nRansom (Ted) Davis \nAssociate General Counsel \nMaryland Public Service \nCommission \n6 St. Paul Street \n16th Floor \nBALTIMORE, MARYLAND \n21202 \nUNITED STATES \nRansom.Davis@Maryland.gov \nMiles H Mitchell \nGeneral Counsel \nMaryland Public Service \nCommission \n6 St. Paul Street \n16th Floor, William Donald \nSchaefer Tower \nBaltimore, MARYLAND 21202 \nmiles.mitchell@maryland.gov \nMorris Schreim \n6 St. Paul Street \nBaltimore, MARYLAND 21202 \nmorris.schreim@maryland.gov \nMaryland \nPublic \nService \nCommissio \nn \nMaryland \nPublic \nService \nCommissio \nScott Strauss \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nUNITED STATES \nScott.Strauss@spiegelmcd.com \nJeffrey A. Schwarz \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \njeffrey.schwarz@spiegelmcd.com \nMassachus \netts \nMunicipal \nWholesale \nElectric \nCompany \nMatthew J. Ide \nExec. Director of Special Proj \nMassachusetts Municipal \nWholesale Electric Company \n327 Moody Street \nP.O. Box 426 \nLudlow, MASSACHUSETTS \n01056 \nMIde@mmwec.org \nMassachus \netts \nMunicipal \nWholesale \nElectric \nCompany \n- 41 - \n483 of 515"},{"page":193,"startToken":66962,"endToken":67131,"text":"- Case: 26-3621 \nDocument: 1-1 \nPage: 484 \nDate Filed: 10/16/2026 \nMassachus \nefts \nMunicipal \nWholesale \nElectric \nCompany \n- - \n- \n: \nService\n \n8th Floor\n \nE \nSpiegel & McDiarmid LLP \n1818 N Street NW \nWashington, DISTRICT OF \nCOLUMBIA 20036 \neservice@spiegelmcd.com \nMid- \nAtlantic \nInterstate \nTransmissi \non LLC \nAmanda Parker \nAttorney \nFirstEnergy Service Company \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.com \nthartzell@firstenergycorp.corm\nMorgan \nTricia S Hartzell \nFirstEnergy Legal Specialist \nFirstEnergy Service Company \n76 S. Main Street \n15th Floor \nAkron, OHIO 44308 \nMid- \nAtlantic \nInterstate \nTransmissi \non LLC \nParke \nAssociate General Counsel \nFirstEnergy \n341 White Pond Dr. \nAkron, OHIO 44320 \nUNITED STATES \nmparke@firstenergycorp.com \nMid- \nAtlantic \nInterstate \nTransmissi \non, LLC \n. Deborah L. Jacobson, ESQ \nAttorney \n341 WHITE POND DR \nAKRON, OHIO 44320 \ndjacobson@firstenergycorp.com \n: \nMidwest \n \nGeneration, \n \nLLC \n, \nNeal Fitch \nSr. Director, Regulatory Affai \nNRG Energy, Inc. \n804 CARNEGIE CTR \nPRINCETON, NEW JERSEY \n08540 \nUNITED STATES \nneal.fitch@nrg.com \nMidwest \n, \nGeneration' ' \nLLC \nCortney Slager \nVP & Assistant General Counsel \nNRG Companies \n804 Carnegie Center \n., \n-42-\n484 of 515"},{"page":194,"startToken":67131,"endToken":67325,"text":"Princeton, NEW JERSEY 08540 \nUNITED STATES \ncortney.slager@nrg.com \nJennifer Hsia \nAssistant General Counsel \nNRG Energy \n804 Carnegie Center \nPrinceton, NEW JERSEY 08540 \nUNITED STATES \nJennifer.Hsia@nrg.com \nMidwest \nGeneration, \nLLC \nWilliam Booth \nMichael Best & Friedrich, LLP \n1000 Maine Ave SW \nSuite 400 \nWashington, D.C., DISTRICT OF \nCOLUMBIA 20024 \nUNITED STATES \nwdbooth@michaelbest.com \nAlex L. Peterson \nMichael Best & Friedrich, LLP \n1000 Maine Avenue, S.W. \nSuite 400 \nWashington, DISTRICT OF \nCOLUMBIA 20024 \nalpeterson@michaelbest.com \nMississippi \nPublic \nService \nCommissio \nn \nBarton Norfleet \nSpecial Counsel for Federal En \n501 N. West Street, Suite 201-A \nP.O. Box 1174 \nJACKSON, MISSISSIPPI 39201 \nbarton.norfleet@psc.ms.gov \nMississippi \nPublic \nService \nCommissio \nn \nJeffrey Mayes \nGeneral Counsel \nMonitoring Analytics, LLC \n2621 Van Buren Avenue, Suite 160 \nValley Forge Corporate Center \nEagleville, PENNSYLVANIA \n19403 \nUNITED STATES \njeffrey.mayes@monitoringanalytic \ns.com \nSuzette N Krausen \nExecutive Assistant \nMonitoring Analytics, LLC \n2621 Van Buren Ave Ste 160 \nNorristown, PENNSYLVANIA \n19403 \nSuzetteKrausen@monitoringanal \nytics.com \nMonitoring \nAnalytics, \nLLC \nJoseph Bowring \nMonitoring Analytics, LLC \n2621 Van Buren Avenue, Suite \n160 \nMonitoring \nAnalytics, \nLLC \nCase: 26-3621 \nDocument: 1-1 \nPage: 485 \nDate Filed: 10/16/2026 \n- 43 - \n485 of 515"},{"page":195,"startToken":67325,"endToken":67490,"text":"-Case: 26-3621 \nDocument: 1-1 \nPage: 486 \nDate Filed: 10/16/2026 \nNorristown, PENNSYLVANIA \n19403 \nJoseph.Bowring@monitoringanaly \ntics.com \nMonongahe \nla Power \nCompany \n' \nAmanda Parker \nAttorney \n, \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \na parker @firstenergycorp.com \nDeborah L. Jacobson, ESQ \nAttorney \n341 WHITE POND DR \nAKRON, OHIO 44320 \ndjacobson@firstenergycorp.com \nMonongahe, \nla Power \nCompany \nAmanda Parker \nAttorney \nFirstEnergy Service Company \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.com \nthartzell@firstenergycorp.corm\nMorgan \nTricia S Hartzell \nFirstEnergy Legal Specialist \nFirstEnergy Service Company \n76 S. Main Street \n15th Floor \nAkron, OHIO 44308 \nMonongahe \nla Power \nCompany \nParke \nAssociate General Counsel \nFirstEnergy \n341 White Pond Dr. \nAkron, OHIO 44320 \nUNITED STATES \nmparke@firstenergycorp.com \nNational \nGrid \n, \n. \nPatrick Tarmey \nSenior Counsel \nNational Grid \n170 Data Drive \nWaltham, MASSACHUSETTS \n02451 \nUNITED STATES \npatrick.tarmey@nationalgrid.com \nNational \nGrid \nRenewable \ns \nDevelopme \nnt, LLC \nKurt Rempe \nNational Grid Renewables \nDevelopment, LLC \n8400 NORMANDALE LAKE \nBLVD S'IE 1200 \nBLOOMINGTON, MINNESOTA \n- 44 - \n486 of 515"},{"page":196,"startToken":67490,"endToken":67668,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 487 \nDate Filed: 10/16/2026 \n55437 \nUNITED STATES \nkrempe@geronimopower.com \nMatthew Morais \nSenior Director, Federal Reg \nPJM Interconnection, L.L.C. \n8400 Normandale Lake Boulevard \nSuite 1200 \nBloomington, MINNESOTA \n55437 \nUNITED STATES \nmmorais@geronimopower.com \nConnor Nelson \nNational Hydropower Associatio \nNational Hydropower Association \n200 MASSACHUSETTS AVE \nNW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nconnor@hydro.org \nMichael Purdie \nNational Hydropower Association \n601 NEW JERSEY AVE NW \nSTE 660 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nmichael@hydro.org \nNational \nGrid \nRenewable \nDevelopme \nnt, LLC \nNational \nHydropowe \nr \nAssociation \nSusan Bruce \nMcNees Wallace & Nurick LLC \n100 Pine Street \nP.O. Box 1166 \nHarrisburg, PENNSYLVANIA \n17108 \nUNITED STATES \nsbruce@mcneeslaw.com \nKenneth R. Stark \nMcNees Wallace & Nurick LLC \n100 Pine Street \nP.O. Box 1166 \nHarrisburg, PENNSYLVANIA \n17108 \nkstark@mcneeslaw.com \nNational \nRailroad \nPassenger \nCorporatio \nn \n(\"Amtrak\") \nMatthew L. Garber \nMcNees Wallace & Nurick LLC \n100 Pine Street \nP.O. Box 1166 \nHarrisburg, PENNSYLVANIA \n17108 \nmgarber@mcneeslaw.com \nNational \nRailroad \nPassenger \nCorporatio \nn \n(\"Amtrak\") \nNational \nRural \nAdrienne Clair \nThompson Coburn LLP \n- 45 - \n487 of 515"},{"page":197,"startToken":67668,"endToken":67828,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 488 \nDate Filed: 10/16/2026 \nElectric \n' \nCooperativ \ne \n\" \nAssociation \n1 \n1909 K Street NW \nSuite 600 \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \naclair@thompsoncoburn.com\n \nNational \nRural \nElectric \nCooperativ \ne \nAssociation \n' \nMary Ann Ralls \nSenior Direct, Regulatory Coun \nNational Rural Electric \nCooperative Association \n4301 Wilson Blvd. \nArlington, VIRGINIA 22203 \nmaryann.ralls@nreca.coop \nNatural \nResource \nDefense \nCouncil \nTom Rutigliano \nSr. Advocate \nNRDC/FERC Project \n1124 15th St. NW \nSuite 300 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \ntrutigliano@nrdc.org \nNebraska \nPublic \n. \nPower \nDistrict \nDavid D'Alessandro \nAttorney \nStinson LLP \n1775 Pennsylvania Avenue, Suite \n800 \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \ndavid.dalessandro@stinson.com \n, \n! \nJohn McClure \nExec.VP Ext Affair/Gen Counsel \n1414 15th Street \nColumbus, NEBRASKA 68601 \njcmcclu@nppd.com \nNebraska \nPublic \nPower \nDistrict \n, \n'\nHarold Hadland \nNebraska Public Power District \n1414 15th Street \nColumbus, NEBRASKA 68601 \nhlhadla@nppd.com \nNeptune \nRegional \n' \nWilliam Hollaway \nGibson, Dunn & Crutcher LLP \n-46-\n488 of 515"},{"page":198,"startToken":67828,"endToken":68014,"text":"Transmissi \non System, \nLLC \n1050 Connecticut Ave NW \nWashington, DISTRICT OF \nCOLUMBIA 20036 \nUNITED STATES \nWHollaway@gibsondunn.com \nEdward Stern \nPresident and CEO \nGibson, Dunn & Crutcher LLP \n501 Kings Highway East, Suite 300 \nFairfield, CONNECTICUT 06825 \nUNITED STATES \nestern@powerbridge.us \nNeptune \nRegional \nTransmissi \non System, \nLLC \nRobert Glover \nNew Jersey Division of Rate \nCounsel \nPO Box 003 \nTrenton,NEW JERSEY 08625 \nUNITED STATES \nrglover@rpa.nj.gov \nT. David Wand \nDivision of Rate Counsel \nNew Jersey Division of Rate \nCounsel \n140 E. Front St. \n4th Flr. \nTrenton, NEW JERSEY 08625 \ndwand@rpa.nj.gov \nNew Jersey \nDivision of \nRate \nCounsel \nDebora Layugan \nNew Jersey Division of Rate \nCounsel \nPO Box 003 \nTrenton, 08625 \ndlayugan@rpa.nj.gov \nNew Jersey \nDivision of \nRate \nCounsel \nBrian O. Lipman \nDirector \nNew Jersey Division of Rate \nCounsel \nPO Box 003 \nTrenton, 08625 \nblipman@rpa.nj.gov \nNew Jersey \nDivision of \nRate \nCounsel \nNew York \nState \nReliability \nCouncil, \nL.L.C. \nAmanda De Vito \nCouch White, LLP \n540 Broadway, Suite 7 \nAlbany, NEW YORK 12207 \nCase: 26-3621 \nDocument: 1-1 \nPage: 489 \nDate Filed: 10/16/2026 \n-47-\n489 of 515"},{"page":199,"startToken":68014,"endToken":68211,"text":"— Case: 26-3621 \nDocument: 1-1 \nPage: 490 \nDate Filed: 10/16/2026 \nUNITED STATES \nadevito@couchwhite.com \nNextEra \nEnergy \n, \nTransmissi \non \nMidAtlanti \nc Indiana, \nInc. \n. \n: \nTravis M. Contratto \nPrincipal Attorney \n801 Pennsylvania Avenue, N.W. \nSuite 220 \nWashington, DISTRICT OF \nCOLUMBIA 20004 \nTravis.Contratto@nee.com \nNorth \nAmerican \nElectric \nReliability \nCorporatio \nn \nCaelyn Palmer \n1325 G Street NW \nSuite 600 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \ncaelyn.palmer@nerc.net \nCandice Castaneda \nSenior Counsel \nNorth American Electric \nReliability Corporation \n1325 G Street, NW \nSuite 600 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \ncandice.castaneda@nerc.net \nNortheast \nTexas \nElectric \nCooperativ \ne, Inc. \nF. Alvin Taylor \nAttorney \nMcCarter & English, LLP \n1301 K Street, NW \nSuite 1000 West \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nataylor@mccarter.com \nNortheaster \nn REMC \n. \nAlexandra Jones \nVP & Sr. Counsel of Energy and \nNORTHEASTERN REMC \n6908 GEM CREEK LN \nWHITESTOWN, INDIANA 46075 \nUNITED STATES \n, \na~jones@nremc.com \nEric Jung \nPresident/CEO \nNORTHEASTERN REMC \n4901 E Park 30 Drive \nColumbia City, INDIANA 46725 \nejung@nremc.com \nNorthern \nVirginia \nElectric \n' \nAlan Robbins \nPartner \n' \nWashington Energy Law LLP  \n900 17TH ST NW STE 500-A \nPatrick Toulme \nNorthern Virginia Electric \nCooperative, \n10323 Lomond Drive \n-48-\n490 of 515"},{"page":200,"startToken":68211,"endToken":68350,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 491 \nDate Filed: 10/16/2026 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \narobbins@washingtonenergylaw.co \nm \nManassas, VIRGINIA 20109 \nptoulme@novec.com \nCooperativ \ne, Inc. \nDebra Roby \nPartner \nWashington Energy Law LLP \n900 17th Street NW \nSuite 500-A \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \ndroby@washingtonenergylaw.com \nThomas Steiger \nAssociate \nWashington Energy Law LLP \n900 17th Street NW \nSuite 500-A \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \ntsteiger@washingtonenergylaw.co \nm \nNeal Fitch \nSr. Director, Regulatory Affai \nNRG Energy, Inc. \n804 CARNEGIE CTR \nPRINCETON, NEW JERSEY \n08540 \nUNITED STATES \nneal.fitch@nrg.com \nCortney Slager \nVP & Assistant General Counsel \nNRG Companies \n804 Carnegie Center \nPrinceton, NEW JERSEY 08540 \nNorthern \nVirginia \nElectric \nCooperativ \ne, Inc. \nNorthern \nVirginia \nElectric \nCooperativ \ne, Inc. \nG \nBusiness \nMarketing \nLLC \nG \nBusiness \nMarketing \nLLC \n-49-\n491 of 515"},{"page":201,"startToken":68350,"endToken":68517,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 492 \nDate Filed: 10/16/2026 \n• \nUNITED STATES \ncortney.slager@nrg.com \nNRG \nBusiness \n, \nMarketing \nLLC \nJennifer Hsia \nAssistant General Counsel \nNRG Energy \n804 Carnegie Center \nPrinceton, NEW JERSEY 08540 \nUNITED STATES \nJennifer.Hsia@nrg.com \nOffice of \nthe Ohio \nConsumers' \nCounsel \nDenise Goulet \nPartner \nMcCarter & English, LLP \n1301 K ST NW \nSUITE 1000 WEST \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \ndgoulet@mccarter.com \nOffice of \n, \nthe Ohio \n, \nConsumers' \nCounsel \nAngela O'Brien \nDeputy Consumers' Counsel \nOffice of the Ohio Consumers' \nCounsel \n65 E STA IE ST STE 700 \nOFFICE OF THE O111O \nCONSUMERS' COUNSEL \nCOLUMBUS, OHIO 43215 \nUNITED STATES \nangela.obrien@occ.ohio.gov \nOhio \n, \nFederal  \nEnergy \nAdvocate \nThomas Lindgren \nAssistant Attorney General \nPublic Utilities Commission of \n. \nOhio \n30 East Broad Street \n16th Floor \nColumbus, OHIO 43215-3793 \nUNITED STATES \nthomas.lindgren@ohioattomeygene \nl.g \nraov \nSarah Parrot \nFederal Energy Advocate \nPublic Utilities Commission of \nOhio \n180 E BROAD ST \nCOLUMBUS, OHIO 43215 \nsarah.parrot@puco.ohio.gov \n-50-\n492 of 515"},{"page":202,"startToken":68517,"endToken":68715,"text":"Chris Zentz \nPartner \n750 9th St. NW, #750 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nchris.zentz@akerman.com \nRobert L Pennybaker \nRegulated Pricing & Analysis M \nPO Box 201 \nTULSA,DISTRICT OF \nCOLUMBIA 74102 \nrlpennybaker@aep.com \nOhio \nPower \nCompany \nJoe Bower \n700 K Street NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \njoe.bower@bakerbotts.com \nOhio \nPower \nCompany \nScott R Cunningham \nElectrical Operations Director \nPO BOX 468 \n3932 US ROUTE 23 \nPIKETON, OHIO 45661 \nscunning@ovec.com \nOhio \nValley \nElectric \nCorporatio \nn \nNick Privette \n3932 U.S. Route 23 \npiketon, OHIO 47250 \nUNITED STATES \nnprivett@ovec.com \nJecoliah Williams \n555 Eleventh Street NW \nSuite 1000 \nWashington, DISTRICT OF \nCOLUMBIA 20004 \nUNITED STATES \njecoliah.williams@lw.com \nAdrienne E. Clair \n1909 K Street NW \nSuite 600 \nWashington, DISTRICT OF \nCOLUMBIA 20006 \naclair@thompsoncoburn.com \nOld \nDominion \nElectric \nCooperativ \ne \nJames Dunn \nSenior Counsel \nOne Power Company \n12385 Township Road 215 \nFindlay, OHIO 45840 \nUNITED STATES \njdunn@onepower.com \nOne Power \nCompany \nGregory Carmean \nExecutive Director \nOrganization of PJM States, Inc. \n700 Barksdale Road \nSuite 1 \nNewark, DELAWARE 19711 \nOrganizatio \nn of PJM \nStates, Inc. \nCase: 26-3621 \nDocument: 1-1 \nPage: 493 \nDate Filed: 10/16/2026 \n-51-\n493 of 515"},{"page":203,"startToken":68715,"endToken":68877,"text":"= Case: 26-3621 \nDocument: 1-1 \nPage: 494 \nDate Filed: 10/16/2026 \nUNITED STATES \ngreg@opsi.us \nPacific Gas , \nand \nElectric \nCompany \nCharles Middlekauff \nChief Counsel \nPacific Gas and Electric Company \nPO Box 1018 \nOakland,CALIFORNIA 94604-\n1018 \nUNITED STATES \nCharles.Middlekauff@pge.com \nPECO \nEnergy \nCompany \nCarlos Isaac \nAssistant General Counsel \nExelon Corporation \n10 S. Dearborn Street \nChicago, ILLINOIS 60603 \nUNITED STATES \ncarlos.isaac@exeloncorp.com \nStan Berman\n \n3502 Fremont Ave N, #1\n \nSeattle, WASHINGTON 98103\n \nstan@bermlaw.com \nPennsylvan \nis Office of \nConsumer ' \nAdvocate \nMelanie El Atieh \nDeputy Consumer Advocate \nPennsylvania Office of Consumer \nAdvocate \n555 WALNUT ST \n5TH FLOOR, FORUM PLACE \nHARRISBURG, \nPENNSYLVANIA 17101 \nUNITED STATES \nmelatieh@paoca.org \nHARRISBURG,\n \nDenell Lewis \nPennsylvania Office of Consumer \nAdvocate \n555 WALNUT ST\n \nPENNSYLVANIA 17101\n \ndlewis@paoca.org \nPennsylvan  \nis Office of \nConsumer \nAdvocate \n' \nJosiah Harmar \nAssistant Consumer Advocate \nPennsylvania Office of Consumer \nAdvocate \n555 WALNUT ST \n5th Floor, Forum Place \nHARRISBURG, \nPENNSYLVANIA 17101 \nUNITED STATES \njharmar@paoca.org \n- 52 - \n494 of 515"},{"page":204,"startToken":68877,"endToken":69050,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 495 \nDate Filed: 10/16/2026 \nSusan Bruce \nMcNees Wallace & Nurick LLC \n100 Pine Street \nP.O. Box 1166 \nHarrisburg, PENNSYLVANIA \n17108 \nUNITED STATES \nsbruce@mcneeslaw.com \nPJM \nIndustrial \nCustomer \nCoalition \nLauren Huff \nParalegal \nMcNees Wallace & Nurick LLC \n100 Pine Street \nP.O. Box 1166 \nHarrisburg, PENNSYLVANIA \n17108 \nlhuff@mwn.com \niDavid S. Mabry \nMcNees Wallace & Nurick LLC \n100 Pine Street \nHarrisburg, PENNSYLVANIA \n17101 \ndmabry@mwn.com \nCraig Glazer \nV.P., Federal Gov't Policy \n1200 G Street, N.W. \nSuite 600 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \ncraig.glazer@pjm.com \nRyan J. Collins \nAttorney \n1200 G Street, N.W. \nSuite 600 \nWashington, DISTRICT OF \nCOLUMBIA 20005-3898 \ncollins@wrightlaw.com \nPJM \nIndustrial \nCustomer \nCoalition \nPJM \nIndustrial \nCustomer \nCoalition \nMark Stanisz \nAssistant General Counsel \nPJM \n2750 Monroe Blvd. \nInterconnec Audubon, PENNSYLVANIA \ntion L.L.C \n19403 \nUNITED STATES \nmark.stanisz@pjm.com \nAndrew Swers \n1200 G ST NW \nPJM \nSuite 600 \nInterconnec Washington, DISTRICT OF \ntion L.L.C COLUMBIA 20005 \nUNITED STATES \nswers@wrightlaw.com \n- 53 - \n495 of 515"},{"page":205,"startToken":69050,"endToken":69235,"text":"- Case: 26-3621 \nDocument: 1-1 \nPage: 496 \nDate Filed: 10/16/2026 \nPJM \n, \ntion, L.L.C.' \nInterconnec . \nMark Stanisz \n: \nAssistant General Counsel \n' \nPJM Interconnection, L.L.C. \n2750 Monroe Blvd. \n. \nAudubon, PENNSYLVANIA \n19403 \n. \nUNITED STATES  \nmark.stanisz@pjm.corn \nCraig Glazer \ni \nV.P., Federal Gov't Policy \nPJM Interconnection, L.L.C. \n1200 G Street, N.W. \nSuite 600 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \ncraig.glazer@pjm.com \nPJM \nInterconnec \ntion, L.L.C.: \nArleigh Helfer \nSr. Counsel \nPJM Interconnection, L.L.C. \n2750 Monroe Boulevard \nAudubon, PENNSYLVANIA \n19403 \narleigh.helfer@pjm.com \nPJM Power \nProviders \nGroup \n' \nGlen Thomas \n101 Lindenwood Drive \nSuite 225 \nMalvern, PENNSYLVANIA \n19355 \nUNITED STATES \ngthomas@gtpowergroup.com\n \nDiane L Slifer \n101 LINDENWOOD DR STE 225 \nMALVERN, PENNSYLVANIA \n19355 \ndslifer@gtpowergroup.com \nPJM Power \nProviders \nGroup \nLaura Chappelle \n6688 FOREST BEACH DR \nHOLLAND, MICHIGAN 49423 \nlaurac@chappelleconsulting.net \nPotomac \nElectric \nPower  \nCompany \n' \nGary Guy \nAssistant General Counsel \nExelon Corporation \n701 Ninth Street, NW \nWashington, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \ngary.guy@exeloncorp.com \nPPL \nElectric \n: \nUtilities \nSteven Nadel \nPPL Services Corporation \n645 Hamilton Street \nSuite 601\n \n-54-\n496 of 515"},{"page":206,"startToken":69235,"endToken":69401,"text":"Allentown, PENNSYLVANIA \n18101 \nUNITED STATES \nSMNadel@pplweb.com \nCorporatio \nn \nPPL \nElectric \nUtilities \nCorporatio \nn \nJohn Longstreth \nK&L Gates LLP \n1601 K Street, NW \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \njohn.longstreth@klgates.com \nDonald Kaplan \nK&L Gates LLP \n1601 K Street, NW \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \ndon.kaplan@klgates.com \nWilliam Keyser \nSteptoe LLP \n1330 Connecticut Avenue NW \nWashington, DISTRICT OF \nCOLUMBIA 20036 \nUNITED STATES \nwkeyser@steptoe.com \nPPL \nElectric \nUtilities \nCorporatio \nn \nPPL \nElectric \nUtilities \nCorporatio \nn \nViet Ngo \nAssociate Counsel, Federal Reg \nPublic Service Enterprise Group \nIncorporated \n601 New Jersey Ave, NW \nSuite 310 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nViet.Ngo@pseg.com \nJodi Moskowitz \nDeputy General Counsel and RTO \nPSEG Services Corporation \nStrategy Officer \n80 Park Plaza, T-20 \newark, NEW JERSEY 07102 \nJodi.Moskowitz@pseg.com \nPSEG \nPower LLC \nRobert E. Gardinor \nParalegal \nPSEG Services Corporation \nPSEG \nPower LLC \nCase: 26-3621 \nDocument: 1-1 \nPage: 497 \nDate Filed: 10/16/2026 \n-55-\n497 of 515"},{"page":207,"startToken":69401,"endToken":69598,"text":"-Case: 26-3621 \nDocument: 1-1 \nPage: 498 \nDate Filed: 10/16/2026 \n80 Park Plaza, T5 \nNewark, NEW JERSEY 07102 \nRobert.Gardinor@pseg.com \nPSEG \n' \nCompanies \nViet Ngo \nAssociate Counsel, Federal Reg \nPublic Service Enterprise Group \n, \nIncorporated \n601 New Jersey Ave, NW \nSuite 310 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nViet.Ngo@pseg.com _ \nJodi Moskowitz \nDeputy General Counsel and RTO \nPSEG Services Corporation \nStrategy Officer \n80 Park Plaza, T-20 \nNewark, NEW JERSEY 07102 \nJodi.Moskowitz@pseg.com \n. \nPSEG \nCompanies \nRobert E. Gardinor \nParalegal \nPSEG Services Corporation \n80 Park Plaza, T5 \nNewark, NEW JERSEY 07102 \nRobert.Gardinor@pseg.com \nPSEG \nEnergy \nResources \n& Trade \nLLC \nViet Ngo \nAssociate Counsel, Federal Reg \nPublic Service Enterprise Group \nIncorporated \n601 New Jersey Ave, NW \nSuite 310 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \n. \nUNITED STATES \nViet.Ngo@pseg.com \nJodi Moskowitz \nDeputy General Counsel and RTO \nPSEG Services Corporation \nStrategy Officer \n80 Park Plaza, T-20 \nNewark, NEW JERSEY 07102 \nJodi.Moskowitz@pseg.com \nPSEG \nEnergy \nResources \n& Trade \nLLC \n' \n- \n- . \n- \nRobert E. Gardinor \nParalegal \nPSEG Services Corporation \n80 Park Plaza, T5 \nNewark, NEW JERSEY 07102 \nRobert.Gardinor@pseg.com \nPUBLIC \nCITIZEN, i \nINC \nTyson Slocum \nEnergy Program Director \nPUBLIC CITIZEN, INC\n \n-56-\n498 of 515"},{"page":208,"startToken":69598,"endToken":69790,"text":"215 PENNSYLVANIA AVE SE \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20003 \nUNITED STATES \ntslocum@citizen.org \nPublic \nService \nCommissio \nn of West \nVirginia \nJacqueline Roberts \nFederal Policy Advisor, WV Pub \nWest Virginia Public Service \nCommission \n201 Brooks Street \nCharleston, WEST VIRGINIA \n25301 \nUNITED STATES \njroberts@psc.state.wv.us \nViet Ngo \nAssociate Counsel, Federal Reg \nPublic Service Enterprise Group \nIncorporated \n601 New Jersey Ave, NW \nSuite 310 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \nViet.Ngo@pseg.com \nJodi Moskowitz \nDeputy General Counsel and RTO \nPSEG Services Corporation \nStrategy Officer \n80 Park Plaza, T-20 \nNewark, NEW JERSEY 07102 \nJodi.Moskowitz@pseg.com \nPublic \nService \nElectric \nand Gas \nCompany \nRobert E. Gardinor \nParalegal \nPSEG Services Corporation \n80 Park Plaza, T5 \nNewark, NEW JERSEY 07102 \nRobert.Gardinor@pseg.com \nPublic \nService \nElectric \nand Gas \nCompany \nJohn Shepherd \nSpecial Asst Attorney General \n2200 Pennsylvania Avenue \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20037 \nUNITED STATES \njshepherd@hunton.com \nJodi Moskowitz \nDeputy General Counsel and RTO \nStrategy Officer \n80 Park Plaza, T-20 \nNewark, NEW JERSEY 07102 \nJodi.Moskowitz@pseg.com \nPublic \nService \nElectric \nand Gas \nCompany \nCase: 26-3621 \nDocument: 1-1 \nPage: 499 \nDate Filed: 10/16/2026 \n-57-\n499 of 515"},{"page":209,"startToken":69790,"endToken":69996,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 500 \nDate Filed: 10/16/2026 \nPublic \nService \nElectric \nand Gas \nCompany \n, \n: \nBlake Grow \n2200 Pennsylvania Avenue, NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20037 \nbgrow@hunton.com \nRepsol \nEnergy \nNorth \nAmerica \nCorporatio \nn \nJordan Kirwin \nRegulatory Affairs \nRepsol Energy North America \nCorporation \n2455 Technology Forest Blvd. \nThe Woodlands, TEXAS 77381 \nUNITED STATES \njordan.kirwin@repsol.com \nRockland \nElectric \nCompany \nJohn Longstreth \nK&L Gates LLP \n1601 K Street, NW \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \njohn.longstreth@klgates.com \n' \nRockland \nElectric \nCompany \nJoshua Kirstein \nSenior Attorney \nConsolidated Edison Company of \nNew York, Inc. \nConsolidated Edison Co. of New \nYork, Inc. \n4 Irving Place-18th Floor \nNew York, NEW YORK 10003 \nUNITED STATES \nkirsteinj@coned.com \nYork, Inc.\n \nJoshua A Kirstein \nSenior Attorney \nConsolidated Edison Company of \nNew York, Inc. \nConsolidated Edison Co. of New \n4 Irving Place-18th Floor \nNew York, NEW YORK 10003 \nkirsteinj@coned.com\n \nRockland  \nElectric \nCompany \nSebrina Greene \nAssociate General Counsel \nConsolidated Edison Company of \nNew York Inc.\n \n, \n4 Irving Place \nNew York, NEW YORK 10003 \nUNITED STATES \ngreenes coned.com \n= \n: \n' \nSebrina M. Greene\n \nAssociate General Counsel \n \nConsolidated Edison Company of \nNew York, Inc. \n4 Irving  Place \nNew York, NEW YORK 10003 \ngreenes@coned.com \n-58-\n500 of 515"},{"page":210,"startToken":69996,"endToken":70183,"text":"Shell \nEnergy \nNorth \nAmerica \n(US), L.P. \nELAM GALE-AHMAD \nParalegal \nCon Edison Company of New \nYork \n4 IRVING PL \nNEW YORK, NEW YORK 10003 \ngaleahmadn@coned.com \nRockland \nElectric \nCompany \nDana Lazarus \nDirector \nCon Edison Company of New \nYork \n4 Irving Place \nNew York, NEW YORK 10003 \nlazarusd@coned.com \nRockland \nElectric \nCompany \nDavid C Burns \nProject Manager \nConsolidated Edison Company of \nNew York, Inc. \nConsolidated Edison Co. of New \nYork, Inc. \n4 Irving Place-18th Floor \nNew York, NEW YORK 10003 \nburnsd@coned.com \nRockland \nElectric \nCompany \nJonathan Newlander \nAttorney \nSan Diego Gas & Electric \nCompany \n8330 Century Park Ct \nSan Diego, CALIFORNIA 92123 \nUNITED STATES \nJNewlander@sdge.com \nSean Chang \nDirector, Regulatory Affairs \nShell Energy North America (US), \nL.P. \n1000 Main Street \nLevel 12 \nHouston, TEXAS 77002 \nPamela Mills \nRegulatory Affairs Mgr \nSan Diego Gas & Electric \n8330 Century Park \nsan diego, CALIFORNIA 92122 \npmills@sdge.com \nMatthew J. Picardi, ESQ \nVice President \nShell Energy North America (US), \nL.P. \n36 Pinewood Ave. \nSaratoga Springs, NEW YORK \nSan Diego \nGas & \nElectric \nCompany \nCase: 26-3621 \nDocument: 1-1 \nPage: 501 \nDate Filed: 10/16/2026 \n-59-\n501 of 515"},{"page":211,"startToken":70183,"endToken":70378,"text":"- --Case: 26:3621 \nDocument: 1-1 \nPage: 502 \nDate Filed: 10/16/2026 \nUNITED STATES \nsean.chang@shell.com \n12866 \nMatthew.Picardi@shell.com \nShell \nEnergy \nNorth \n' America \n(US), L.P. \nf \n: \nShaela McNulty Collins \nS. Power Policy Adv., Corp. \nShell Energy North America \n(U.S.), L.P. \n1050 K Street NW \nSuite 700 \nWashington, DISTRICT OF \nCOLUMBIA 20001 \nshaela.collins@shell.com \nSierra Club \nJustin Vickers \nSenior Attorney \nSierra Club \nEnvironmental Law Program \n1229 W. Glenlake Ave. \nChicago, ILLINOIS 60660 \nUNITED STATES \njustin.vickers@sierraclub.org \n' Dorothy E Jaffe \nManaging Attorney \n50 F St NW \nWashington, DISTRICT OF \nCOLUMBIA 20001 \ndori.jaffe@sierraclub.org \nSilver Run , \nElectric, \nLLC \n' \n; \nMichael R. Engleman \n1717 K St. NW \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nmengleman@efenergylaw.com \nSilver Run , \nElectric, \nLLC \nSharon Segner \nVice President \n1001 19th Street North \nSuite 1200 \nArlington, VIRGINIA 22209 \nssegner@lspower.com, \nSolar \nEnergy \n. \nIndustries \nAssociation \nMelissa Alfano \nManager of Regulatory Affairs \nSolar Energy Industries \nAssociation \n1425 K Street, N.W., Suite 1000 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \n: \nBen Norris \nManager of Federal Regulatory\n Solar Energy Industries \nAssociation \n1425 K St NW \n Washington, DISTRICT OF \nCOLUMBIA 20005 \nbnorris seia.org \n-60-\n502 of 515"},{"page":212,"startToken":70378,"endToken":70594,"text":"UNITED STATES \nmalfano@seia.org \nEllen Kenney \nSouthern California Edison \nCompany \n2244 WALNUT GROVE AVE \nROSEMEAD, CALIFORNIA \n91770 \nUNITED STATES \nellen.kenney@sce.com \nSouthern \nCalifornia \nEdison \nCompany \nFERC Case Administration \nSouthern California Edison \nCompany \n2244 WALNUT GROVE AVE \nROSEMEAD, CALIFORNIA \n91770 \nferccaseadmin@sce.com \nJohn Rohrbach \nED Regulatory \n4140 W 99TH ST \nCARMEL, INDIANA 46032 \nUNITED STATES \nJRohrbach@acespower.com \nMark MacDougall \nSenior Vice President and Gene \nPO Box 1937 \nHughesville,MARYLAND 20637-\n1937 \nUNITED STATES \nmark.macdougall@smeco.coop \nDamon Krieger \nVP, Legal Affairs, Deputy Gen \n15035 Burnt Store Road \nP.O. Box 1937 \nHughesville, MARYLAND \n20637-1937 \nDamon.Krieger@SMECO.coop \nEugene Bradford \nVice President, Rates and Ener \n15035 Burnt Store Rd. \nHughesville, MARYLAND 20637 \nEugene.Bradford@smeco.coop \nSouthern \nMaryland \nElectric \nCooperativ \ne, Inc. \nSouthern \nMaryland \nElectric \nCooperativ \ne, Inc. \nDamon Krieger \nVP, Legal Affairs, Deputy Gen \nSouthern Maryland Electric \nCooperative, Inc. \n15035 Burnt Store Road \nP.O. Box 1937 \nHughesville, MARYLAND 20637-\n1937 \nUNITED STATES \nDamon.Krieger@SMECO.coop \nSouthern \nMaryland \nElectric \nCooperativ \ne, Inc. \nJohn Rohrbach \nED Regulatory \nACES POWER MARKETING \n4140 W 99TH ST \nCARMEL, INDIANA 46032 \nJRohrbach@acespower.com \nEugene Bradford \nVice President, Rates and Ener \nSOUTHERN MARYLAND \nELECTRIC COOP INC \nSouthern \nMaryland \nElectric \nCase: 26-3621 \nDocument: 1-1 \nPaae: 503 \nDate Filed: 10/16/2026 \n-61-\n503 of 515"},{"page":213,"startToken":70594,"endToken":70786,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 504 \nDate Filed: 10/16/2026 \nCooperativ : \ne, Inc. \n. \n15035 Burnt Store Rd. \nHughesville, MARYLAND 20637 , \nEugene.Bradford@smeco.coop \nSustainable \nFERC \nProject \nTom Rutigliano \nSr. Advocate \nC/FERC Project \n1124 15th St. NW \nSuite 300 \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \ntrutigliano@nrdc.org \nTalen \nEnergy \nCor poratio \nn \nJennifer Mansh \nSenior VP, Regulatory Counsel \nTalen Energy Corporation \n600 Hamilton Street \nSuite 600 \nAllentown, PENNSYLVANIA \n18101 \nUNITED STATES \nJennifer.Mansh@talenenergy.com \nJacqueline Fleming\n \nContracts and Legal Services A \nTalen Energy Corporation \n600 Hamilton Street, Suite 600 \nAllentown, PENNSYLVANIA \n18101 \njacqueline.fleming@talenenergy.c \n0111 \nThe Dayton \nPower and \nLight \nCompany \nWilliam M Rappolt \nAssistant Gen. Counsel, FERC \n4300 WILSON BLVD \nARLINGTON, VIRGINIA 22203 , \nwilliam.rappolt@aes.com \nThe \nPotomac \n, \nEdison \n, \nCompany \n' \nMichael Kunselman \n1301 K Street, NW Suite 500 East \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nmichaelkunselman@dwt.com \nEvan K Dean, ESQ \nManaging Counsel, Transmission \n341 WHITE POND DR # B-2 \nAKRON, OHIO 44320 \nedean@firstenergycorp.com \nThe \nPotomac \nEdison \nCompany \n.._ . \n' Bradley R. Miliauskas \n1251 Avenue of the Americas \n21st Floor \nNew York, NEW YORK 10020 \nbradleymiliauskas @dwt.com \n-62-\n504 of 515"},{"page":214,"startToken":70786,"endToken":70984,"text":"Amanda Parker \nAttorney \nFirstEnergy Service Company \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.com \nTricia S Hartzell \nFirstEnergy Legal Specialist \nFirstEnergy Service Company \n76 S. Main Street \n15th Floor \nAkron, OHIO 44308 \nthartzell@firstenergycorp.com \nThe \nPotomac \nEdison \nCompany \nMorgan Parke \nAssociate General Counsel \nFirstEnergy \n341 White Pond Dr. \nAkron, OHIO 44320 \nUNITED STATES \nmparke@firstenergycorp.com \nThe \nPotomac \nEdison \nCompany \nThe Retail \nEnergy \nSupply \nAssociation \nElizabeth Whittle \nNixon Peabody LLP \n799 9th Street NW \nSuite 500 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES \newhittle@nixonpeabody.com \nEvan Dean \nManaging Counsel, Transmission \n341 WHITE POND DR # B-2 \nAKRON, OHIO 44320 \nUNITED STATES \nedean@firstenergycorp.com \nMorgan E. Parke \nAssociate General Counsel \n341 White Pond Dr. \nAkron, OHIO 44320 \nmparke@firstenergycorp.com \nTrans-\nAllegheny \nInterstate \nLine \nCompany \nAmanda Parker \nAttorney \nFirstEnergy Service Company \n76 South Main Street \nAkron, OHIO 44308 \nUNITED STATES \naparker@firstenergycorp.com \nMorgan Parke \nAssociate General Counsel \nFirstEnergy \nTricia S Hartzell \nFirstEnergy Legal Specialist \nFirstEnergy Service Company \n76 S. Main Street \n15th Floor \nAkron, OHIO 44308 \nthartzell@firstenergycorp.com \nTrans-\nAllegheny \nInterstate \nLine \nCompany \nTrans-\nAllegheny \nInterstate \nCase: 26-3621 \nDocument: 1-1 \nPage: 505 \nDate Filed: 10/16/2026 \n-63-\n505 of 515"},{"page":215,"startToken":70984,"endToken":71162,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 506 \nDate Filed: 10/16/2026 \nLine \n: \nCompany \n341 White Pond Dr. \nAkron, OHIO 44320 \nUNITED STATES \nmparke@firstenergycorp.com \nTransource , : \nWest \nVirginia, \nLLC \nStacey Burbure \nSVP, Transmission Regulatory \nEngagement & Compliance \n8500 Smiths Mill Road, 4th Floor \nNew Albany, OHIO 43054 \nUNITED STATES \nslburbure@aep.com \n, Jessica A. Cano \nAssoc.Gen.Counsel Regul. East \n1 Riverside Plaza \nColumbus, OHIO 43215-2372 \njacano@aep.com \nU.S. \nEnergy \nStorage \nCoalition \nNoah Roberts \nExecutive Director \n1650 Harvard St NW \nWashington, DISTRICT OF \nCOLUMBIA 20009 \nUNITED STATES \nnoah@energystorage.org \nUGI \nUtilities \nInc. \nLindsay Berkstresser \nCounsel — Energy & Regulatory \nUGI Corporation \n500 N. Gulph Road \nKing of Prussia, \nPENNSYLVANIA 19406 \nUNITED STATES \nberkstresserl@ugicorp.com \n' \nAlexandra Colaizzi \nUGI Utilities, Inc. \n1 UGI Drive \nDenver, PENNSYLVANIA 17517 \nacolaizzi@ugi.com \nUGI \nUtilities \nInc. \ni \nJesse Tyahla \nDirector of Energy Supply & P1 \nUGI Utilities Inc. \n1 UGI Drive \nDenver, PENNSYLVANIA 17517; \nityahla@ugi.com\n_ _ _ _ . \nUGI \nUtilities \nInc. \ni \nJamie Jowers \nSenior Manager, Energy Supply \nUGI Utilities Inc. \n1 UGI Drive  \nDenver, PENNSYLVANIA 17517 \njharper@ugi.com \n-64-\n506 of 515"},{"page":216,"startToken":71162,"endToken":71344,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 507 \nDate Filed: 10/16/2026 \n   \n  \n \n \n \n    \n  \n \n  \nUGI \nUtilities, \nInc. \n \nRichard Bonnifield \nPartner \n1801 PENNSYLVANIA AVE NW \nSTE 1000 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20006 \nUNITED STATES \nrichard.bonnifield@huschblackwell \n.com \n  \nMichael Swerling \nUGI Corporation \n460 N Gulph Road \nKing of Prussia, \nPENNSYLVANIA 19406 \nswerlingm@ugicorp.com \n \n   \n  \n \n \n \n   \n \n \n \n \n   \n  \n \n \n \n   \n \n \n \n \n   \n  \n \n \n \n  Corban A. Coffman \n2001 K Street N. W. \nWashington, DISTRICT OF \nCOLUMBIA 20006 \nccoffman@akingump.com \n \n  \nUGI \nUtilities, \nInc. \n  \n \n \n \n  \n \n   \n  \n \n \n \n  \n \n   \n Michael Jacobs \nSr. Energy Analyst \n \n    \n  \n \n   \n \n \n    \n  \n \n   \n \n \n    \n  \n \n   \n \n \n    \n  \n \n  \nUNION OF \nCONCERN \nED \nSCIENTIS \nTS \n \nUNION OF CONCERNED \nSCIENTISTS \n2 BRATTLE SQ \nCAMBRIDGE, \nMASSACHUSETTS 02138 \nUNITED STATES \nmjacobs@ucs.org \nJason Barker \nVP, Regulatory Affairs \nVitol Inc. \n931 Metfield Rd \nTowson, MARYLAND 21286 \nUNITED STATES \nbja@vcrenewables.com \n \n   \n \n \n \n \n   \n \n \n   \n \n \n \n \n   \n \n \n   \n \n \n \n \n   \n \n \n  Edwin Cambero \nCompliance officer \n2925 RICHMOND AVE \nHOUSTON, TEXAS 77098 \nenc@vitol.com \n \n  \nVC \nRenewable \ns LLC \n \n \n  \n \n   \n \n \n    \n \n \n \n  \nVermont \nPublic \nPower \nSupply \nAuthority \n \nScott Strauss \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \nUNITED STATES \nScott.Strauss@spiegelmcd.com \n  \nJeffrey A. Schwarz \nSpiegel & McDiarmid LLP \n1818 N Street, NW \n8th Floor \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20036 \njeffrey.schwarz@spiegelmcd.com \n \n   \n  \n \n \n \n   \n \n \n \n \n   \n  \n \n \n \n   \n \n \n \n \n   \n  \n \n \n \n   \n \n \n \n \n-65-\n507 of 515"},{"page":217,"startToken":71344,"endToken":71499,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 508 \nDate Filed: 10/16/2026 \nVermont \nPublic \nPower \nSupply \nAuthority \n' \n' \n. \nKenneth A. Nolan \nGeneral Manager \nVermont Public Power Supply \nAuthority \nP.O. Box 126 \nWaterbury Center, VERMONT \n05677 \nknolan@vppsa.com \n. . \nVermont \nPublic \nPower \nSupply \nAuthority \nE Service \nSpiegel & McDiarmid LLP \n1818 N Street NW \n8th Floor \nWashington, DISTRICT OF \nCOLUMBIA 20036 \neservice@spiegelmcd.com \nVerrus \nLLC \nJeffrey Bladen \nVerrus LLC \n918 N Rengstorff Ave \nMountain View, CALIFORNIA \n94043 \nUNITED STATES \nbladen@verrusdata.com \nVirginia \nElectric \nand Power \nCompany \nKathryn Gantley \nCounsel \n' \n400 N CAPITOL ST NW STE 875 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20001 \nUNITED STATES  \n' \nkathryn.gantley@dominionenergy. , \ncorn \nJason B Lazos \nContracts Administrator III \n201 West Blvd. \nWilliamston, NORTH \nCAROLINA 27892 \nJason.B.Lazos@dominionenergy.c \nom \nVirginia \n \nState \nCorporatio ' \nn \nCommissio ' \nn \nFrederick Ochsenhirt \nLegal Advisor to the Commissio \nVirginia State Corporation \nCommission \n1300 E MAIN ST \nRICHMOND, VIRGINIA. 23219 \nUNITED STATES \n-66-\n508 of 515"},{"page":218,"startToken":71499,"endToken":71672,"text":"frederick.ochsenhirt@scc.virginia.g \nov \nNicholas Gladd \nWilson Sonsini Goodrich & Rosati, \nP.C. \n201 Washington St. \nSuite 2000 \nBoston, MASSACHUSETTS \n02108 \nUNITED STATES \nngladd@wsgr.com \nJ. Arnold Quinn \nINDIVIDUAL \n325 7th Street, N.W \nSuite 520 \nWashington, DISTRICT OF \nCOLUMBIA 20004 \nUNITED STATES \narnie.quinn@vistracorp.com \nSarah Greenberg \nWilson Sonsini Goodrich & Rosati \n1700 K ST NW FL 5 \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20006 \nsgreenberg@wsgr.com \nAndrew Weinstein \nDirector of ISO-NE Markets \nVistra Corp. \n325 7th Street, NW \nWASHINGTON, DISTRICT OF \nCOLUMBIA 20004 \nandrew.weinstein@vistracorp.com \nVistra \nCorp. \nVistra \nCorp. \nSeth Cochran \nHead of Strategic Market Polic \nVitol Inc. \n2925 RICHMOND AVE \nHOUSTON, TEXAS 77098 \nUNITED STATES \nsco@vitol.com \nEdwin Cambero \nCompliance officer \n2925 RICHMOND AVE \nHOUSTON, TEXAS 77098 \nenc@vitol.com \nVitol Inc. \nKimaya Abreu \nVoltus \nVoltus, Inc. \n2443 Fillmore Street \n#380-3427 \nSan Francisco, CALIFORNIA \n94115 \nUNITED STATES \nkabreu@voltus.co \nVoltus, Inc. \nVote Solar \nNathan Phelps \nVote Solar \n131 FARMHOLME RD \nCase: 26-3621 \nDocument: 1-1 \nPage: 509 \nDate Filed: 10/16/2026 \n-67-\n509 of 515"},{"page":219,"startToken":71672,"endToken":71831,"text":"Case: 26-3621 \nDocument: 1-1 \nPage: 510 \nDate Filed: 10/16/2026 \n- - _ - - \nSTONINGTON, CONNECTICUT \n06378 \nUNITED STATES \nnathan@votesolar.org \nWabash \nValley \n, \nPower \nAssociation \n, Inc. \nJohn Adragna \n1301 K Street, NW\n \n, \nSuite 1000 West \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nUNITED STATES \nJadragna@mccarter.com \nJeremy L. Fetty\n \n6702 Intech Blvd. \nIndianapolis, INDIANA 46278 \nJJetty@wvpa.com\n \nWabash \nValley \nPower \nAssociation \n, Inc. \nF. Alvin Taylor \nAttorney \n1301 K Street, NW \nSuite 1000 West \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nRandolph Lee Elliott \n1301 K Street, NW \nSuite 1000 West \nWashington, DISTRICT OF \nCOLUMBIA 20005 \nrelliott@mccarter.com \nUNITED STATES \nataylor@mccarter.com \nWabash \nValley \nPower \n \nAssociation' \n,Inc. \nJeremy Fetty \nParr Richey Obremskey & Morton \n6702 Intech Blvd. \nIndianapolis, INDIANA 46278 \nUNITED STATES \nJjetty@wvpa.com \nWheeling \nPower \n, \nCompany  \nWilliam Johnson \nSenior Counsel \ni \n1 Riverside Plaza \n23rd Floor \n: \nColumbus, OHIO 43061 \nUNITED STATES \n, \nwejohnson@aep.com \nJulie Sherwood \n1 Riverside Plaza \nFloor 28 \nColumbus, OHIO 43215 \njasherwood@aep.com \n--- - - \n-68-\n510 of 515"},{"page":220,"startToken":71831,"endToken":71984,"text":"Case: 26-3621 \nDocument: 1-2 \nPage: 1 \nDate Filed: 10/16/2026 \n26-3621 Case Caption \n1 \nOctober 20, 2026 11:54 AM \nExelon Corp; American Transmission Systems, Inc.; Jersey Central Power & \nLight, Co.; Keystone Appalachian Transmission Co.; Mid Atlantic Interstate \nTransmission LLC; Monongahela Power Co.; Potomac Edison Co.; Trans Allegheny \nInterstate Line Co.; American Electric Power Service Corp., on behalf of its \naffiliates; Appalachian Power Co.; Indiana Michigan Power Co.; Kentucky Power \nCo.; Kingsport Power Co.; Ohio Power Co.; Wheeling Power Co.; AEP Appalachian \nTransmission Co., Inc.; AEP Indiana Michigan Transmission Co., Inc.; AEP \nKentucky Transmission Co., Inc.; AEP Ohio Transmission Co., Inc.; AEP West \nVirginia Transmission Co., Inc.; Dayton Power & Light Co., DBA AES Ohio; \nDominion Energy Services, Inc., on behalf of; Virginia Electric & Power Co., \nDBA Dominion Energy Virginia; Duquesne Light Co.; East Kentucky Power \nCooperative, Inc.; PPL Electric Utilities Corp.; Rockland Electric Co., \nPetitioners \nFederal Energy Regulatory Commission \n511 of 515"},{"page":221,"startToken":71984,"endToken":72115,"text":"-- Case: 26-3621 \nDocument: 1-3 \nPage: 1 \nDate Filed: 10/16/2026 \nPATRICIA S. DODSZUWEIT \nCLERK \nOFFICE OF THE CLERK \nUNITED STATES COURT OF APPEALS \n21400 UNITED STATES COURTHOUSE \n601 MARKET STREET \nPHILADELPHIA, PA 19106-1790 \nWebsite: www.ca3.uscourts.gov \nOctober 20, 2026 \nTELEPHONE \n215-597-2995 \n \n \nStanley A. Berman \nStan Berman \n3502 Fremont Avenue N \nSuite 1 \nSeattle, WA 98103 \nJared B. Fish \nFederal Energy Regulatory Commission \n888 1st Street NE \nWashington, DC 20426 \nDavid M. Gossett \nDavis Wright Tremaine \n1301 K Street NW \nSuite 500 East \nWashington, DC 20005 \nGary Guy \nExelon Corporation \n701 Ninth Street NW \nWashington, DC 20068 \nMichael Kunselman \nDavis Wright Tremaine \n1301 K Street NW \nSuite 500 East \nWashington, DC 20005 \nSteven M. Nadel \nPPL Services Corp \n645 Hamilton Street \nSuite 601 \nAllentown, PA 18101 \n512 of 515"},{"page":222,"startToken":72115,"endToken":72344,"text":"Case: 26-3621 \nDocument: 1-3 \nPage: 2 \nDate Filed: 10/16/2026 \nMorgan E. Parke \nFirstenergy Service Co \n341 White Pond Drive \nAkron, OH 44320 \nAmanda P. Parker \nFirstenergy Service Co \n341 White Pond Drive \nAkron, OH 44320 \nWilliam M. Rappolt \nAES US Services LLC \n4300 Wilson Boulevard \nArlington, VA 22203 \nDavid Samford \nEast Kentucky Power Cooperative Inc \nPO Box 707 \nWinchester, KY 40392 \nRobert H. Solomon \nFederal Energy Regulatory Commission \n888 1st Street NE \nRoom 9A-01 \nWashington, DC 20426 \nRE: Exelon Corp, et al v. FERC \nCase Number: 26-3621 \nAgency Case Number: FERC No. AD24-11 \nAgency Case Number: FERC No. EL25-20 \nAgency Case Number: FERC No. EL25-49 \nPACER account holders are required to promptly inform the PACER Service Center of \nany contact information changes. In order to not delay providing notice to attorneys or pro \nse public filers, your information, including address, phone number and/or email address, \nmay have been updated in the Third Circuit database. Changes at the local level will not be \nreflected at PACER. Public filers are encouraged to review their information on file with \nPACER and update if necessary. \nEffective December 15, 2008, the Court implemented the Electronic Case Files System. \nAccordingly, attorneys are required to file all documents electronically. See 3d Cir. L.A.R. \n113 (2008) and the Court's CM/ECF website at https://www.ca3.uscourts.gov/forms. \n513 of 515"},{"page":223,"startToken":72344,"endToken":72666,"text":"Case: 26-3621 \nDocument: 1-3 \nPage: 3 \nDate Filed: 10/16/2026 \nTo All Parties: \nEnclosed is the case opening information regarding the above-captioned petition for review filed \nby Appalachian Power Co, Virginia Electric & Power Co, Trans Allegheny Interstate Line \nCo., American Transmission Systems Inc, AEP Appalachian Transmission Co Inc, \nPotomac Edison Co, Duquesne Light Co, Mid Atlantic Interstate Transmission LLC, PPL \nElectric Utilities Corp, Rockland Electric Co, Dayton Power & Light Co, Keystone \nAppalachian Transmission Co., AEP Indiana Michigan Transmission Co Inc, Indiana \nMichigan Power Co, Kentucky Power Co, Wheeling Power Co, AEP Kentucky \nTransmission Co Inc, Exelon Corp, Ohio Power Co, East Kentucky Power Cooperative Inc, \nKingsport Power Co, American Electric Power Service Corp, Jersey Central Power & \nLight Co, Dominion Energy Services Inc, AEP Ohio Transmission Co Inc, Monongahela \nPower Co, AEP West Virginia Transmission Co Inc, docketed at No. 26-3621. The petition \nwas received on October 16, 2026. All inquiries should be directed to your Case Manager in \nwriting or by calling the Clerk's Office at 215-597-2995. This Court's rules, forms and case \ninformation are available on our website at http://www.ca3.uscourts.gov. \nPursuant to Fed. R. App. P. 17 (a), the agency must file the record with this Court within forty \n(40) days after being served with the petition for review, unless the statute authorizing review \nprovides otherwise. \nAttached is a copy of the full caption. Please review the caption carefully and promptly advise \nthis office in writing of any discrepancies. \nThe docketing fee of $600.00 was received on October 16, 2026. electronically. \n10/16/2026 @ 5:18pm. \nPayment made through pay.gov.. \nA03-69773-560. \nFor Immigration cases only: \nThe filing of this petition for review will not automatically stay removal. A separate Motion for \nStay of Removal must be filed. \nCounsel for Petitioner(s) must file: \n1.Application for Admission (if applicable); \n2. Appearance Form \n3. Disclosure Statement (except governmental entities); \n4. Docketing Statement. \n514 of 515"},{"page":224,"startToken":72666,"endToken":72774,"text":"Case: 26-3621 \nDocument: 1-3 \nPage: 4 \nDate Filed: 10/16/2026 \nThese forms must be filed within 14 days of the date of this letter. \nFailure of Petitioner(s) to comply with any of these requirements by the deadline will result \nin the DISMISSAL of the case without further notice. 3rd Cir. LAR Misc. 107.2. \nCounsel for Respondent(s) must file: \n1.Application for Admission (if applicable); \n2.Appearance Form \n3.Disclosure Statement (except governmental entities). \nThese forms must be filed within 14 days of the date of this letter. \nVery truly yours, \nPatricia S. Dodszuweit, Clerk \nBy: s/ James King \nCase Manager \n267-299-4958 \n515 of 515"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":351,"startToken":0,"endToken":59},{"p":1,"at":351,"title":"C. Necessary Studies","method":"printed heading","endPage":9,"endAt":1053,"startToken":59,"endToken":3615},{"p":9,"at":1053,"title":"D. Other","method":"printed heading","endPage":20,"endAt":870,"startToken":3615,"endToken":8082},{"p":20,"at":870,"title":"E. Effective Date","method":"printed heading","endPage":21,"endAt":1104,"startToken":8082,"endToken":8453},{"p":21,"at":1104,"title":"VI. Paper Hearing","method":"printed heading","endPage":22,"endAt":124,"startToken":8453,"endToken":8697},{"p":22,"at":124,"title":"A. Rates, Terms, and Conditions for Firm and Non-Firm Contract","method":"printed heading","endPage":65,"endAt":1487,"startToken":8697,"endToken":27402},{"p":65,"at":1487,"title":"B. Additional Charge for Eligible Customers Taking FCD and/or NFCD","method":"printed heading","endPage":74,"endAt":1125,"startToken":27402,"endToken":31025},{"p":74,"at":1125,"title":"C. Interconnection Requirements and Operational Practices for","method":"printed heading","endPage":84,"endAt":1796,"startToken":31025,"endToken":35272},{"p":84,"at":1796,"title":"D. Penalty Charge or Other Remedial Action for New Transmission","method":"printed heading","endPage":103,"endAt":331,"startToken":35272,"endToken":43397},{"p":103,"at":331,"title":"E. Anti-Toggling Mechanisms for Firm Contract Demand Transmission","method":"printed heading","endPage":106,"endAt":126,"startToken":43397,"endToken":44487},{"p":106,"at":126,"title":"F. Communications, Alarm, SCADA, or Other Requirements","method":"printed heading","endPage":107,"endAt":1123,"startToken":44487,"endToken":45009},{"p":107,"at":1123,"title":"G. Curtailment Procedures for Interim NITS and Non-Firm Contract","method":"printed heading","endPage":112,"endAt":2102,"startToken":45009,"endToken":47164},{"p":112,"at":2102,"title":"H. Rates, Terms, and Conditions for Interim NITS","method":"printed heading","endPage":114,"endAt":1083,"startToken":47164,"endToken":47877},{"p":114,"at":1083,"title":"Attachment F-3A. Last, Indicated TOs request that PJM add a placeholder section for","method":"printed heading","endPage":122,"endAt":2190,"startToken":47877,"endToken":51604},{"p":122,"at":2190,"title":"I. Annual Report on New Transmission Services","method":"printed heading","endPage":140,"endAt":190,"startToken":51604,"endToken":57966},{"p":140,"at":190,"title":"ATTACHMENT F-3A, OATT ATTACHMENT F-3A (0.0.0)","method":"printed heading","endPage":140,"endAt":240,"startToken":57966,"endToken":57974},{"p":140,"at":240,"title":"ATTACHMENT F-4, OATT ATTACHMENT F-4 (0.0.0)","method":"printed heading","endPage":146,"endAt":65,"startToken":57974,"endToken":59042},{"p":146,"at":65,"title":"ATTACHMENT D","method":"printed heading","endPage":151,"endAt":66,"startToken":59042,"endToken":59613},{"p":151,"at":66,"title":"ATTACHMENT E","method":"printed heading","endPage":174,"endAt":953,"startToken":59613,"endToken":63758},{"p":174,"at":953,"title":"F. Alvin Taylor","method":"printed heading","endPage":190,"endAt":343,"startToken":63758,"endToken":66471},{"p":190,"at":343,"title":"F. Alvin Taylor","method":"printed heading","endPage":199,"endAt":740,"startToken":66471,"endToken":68114},{"p":199,"at":740,"title":"F. Alvin Taylor","method":"printed heading","endPage":219,"endAt":453,"startToken":68114,"endToken":71732},{"p":219,"at":453,"title":"F. Alvin Taylor","method":"printed heading","endPage":224,"endAt":644,"startToken":71732,"endToken":72774}]}