{"document":{"slug":"rec-20261116-5109","title":"Tariff Revisions to Address Commission's ER26-71 Order to Show Cause","issued":"2026-11-16","accession":"20261116-5109","docket":"ER27-500-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Citizens Sycamore-Penasquitos Transmission LLC","kind":"tariff filing","file":"sources/filings/text/20261116-5109_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5109","tier":"record","sha256":"a1e051552cf64261aeb9bd5885fd0afaeb99c4d08d0dadab04c579ab248eba76","pages":6,"tokens":1373,"emptyPages":[],"textThemes":["study"]},"pages":[{"page":1,"startToken":0,"endToken":190,"text":"Duncan \n&Allen LLP \n \n1730 Rhode Island Avenue, Northwest \nWashington, D.C. 20036 \nTelephone (202) 289-8400 \nFAX (202) 289-8450 \n \nCOUNSELLORS AT LAW \n \n \nNovember 16, 2026 \n \n \nVIA ELECTRONIC FILING \n \nDebbie-Anne A. Reese \n Secretary \nFederal Energy Regulatory Commission \n888 First Street, NW \nWashington, DC 20426 \n \nRe:  \nCitizens Sycamore-Penasquitos Transmission LLC Tariff \nRevisions to Address Commission’s Docket No. EL26-71 Order to \nShow Cause, Docket No. ER27-_____-000 \n \nDear Secretary Reese: \n \nOn June 18, 2026 the Commission issued its Order Instituting \nProceeding Under Section 206 of the Federal Power Act (“Show Cause \nOrder”),1 requiring each Participating Transmission Owner (“PTO”) within \nthe California Independent System Operator’s (“CAISO”) system to address \nissues associated with serving large load and co-location arrangements.  In \nthis filing, pursuant to Section 205 of the Federal Power Act, Citizens \nSycamore-Penasquitos Transmission LLC (“Citizens Sycamore”) files \nproposed revisions to its Transmission Owner Tariff (“TO Tariff”) to address \nthe issues raised in the Show Cause Order.  Citizens Sycamore respectfully \nrequests that the Commission accept these TO Tariff revisions to become \neffective January 15, 2027, which is sixty (60) days from the date of this \nfiling. \n \n \n \n \n \n \n \n1  \nCAISO et al., 195 FERC ¶61,214 (2026)."},{"page":2,"startToken":190,"endToken":515,"text":"Duncan \n& Allen LLP \n- 2 - \n \nI. \nBACKGROUND ON CITIZENS SYCAMORE \n \nCitizens Sycamore is a wholly owned subsidiary of Citizens Energy \nCorporation, a non-profit organization dedicated to making life’s basic needs \nmore affordable through successful business ventures.  To date, Citizens \nEnergy Corporation has donated more than $600 million to programs \nsupporting the most vulnerable in our communities.   \n \nIn 2019, Citizens Sycamore invested approximately $27 million with \nSan Diego Gas & Electric Company (“SDG&E”) in the Sycamore-Penasquitos \nProject (“Sycamore Project”) in exchange for a 30-year leasehold interest in \napproximately 12.92% interest in the underground segment of the Sycamore \nProject.2  Citizens Sycamore does not own any of the actual facilities.  \nSDG&E retains ownership and operation and maintenance responsibilities.  \nCitizens Sycamore became a CAISO PTO, turned its interest in the Sycamore  \nProject over to the CAISO’s operational control and recovers its costs through \nits TO Tariff.  As reflected in its TO Tariff, Citizens Sycamore is a “Non-Load-\nServing Participating TO and has no End-Use Customers.”3 \n \nAs part of Citizens Energy Corporation’s charitable mission, Citizens \nSycamore is contractually committed to dedicate 50% of its net after-tax cash \nflow from the Sycamore Project to programs assisting low-income families in \nSDG&E’s service area.  To date, the Sycamore Project has generated $3.7 \nmillion in charitable donations, which are currently being used to purchase \nelectric vehicles for community aid organizations, including Meals on Wheels \nand the Indian Health Council, among others.  Citizens Sycamore estimates \nits involvement in the Sycamore Project will generate approximately $14 \nmillion in charitable assistance over the term of the lease. \n \n \nII. \nRESPONSE TO SHOW CAUSE ORDER \n \n \nThe Commission’s Show Cause Order determined that the TO Tariffs \nof the CAISO PTOs, including Citizens Sycamore, “lack provisions that \naddress, with sufficient clarity and consistency” how each PTO “will timely \nstudy…the provision of transmission service to Eligible Customers on behalf \n \n2  \nSycamore TO Tariff Section 3.70 definition of “Project”. \n3  \nSycamore TO Tariff Section 1 “Preamble”."},{"page":3,"startToken":515,"endToken":833,"text":"Duncan \n& Allen LLP \n- 3 - \n \nof large loads.”4  The Commission directed each PTO to either justify why its \nTO Tariff remained just and reasonable, or to provide TO Tariff revisions \nnecessary to remedy the Commission’s concerns.   \n \nAs discussed in more detail below, Citizens Sycamore has a limited, \nless than 13% leasehold interest in a single segment of the overall Sycamore \nProject transmission line.  Ownership of the transmission line, as well as \nresponsibility for operating and maintaining the line, remains with SDG&E.  \nFor these reasons, Citizens Sycamore proposes revisions to its TO Tariff to \nmake clear that any study, planning, interconnection or expansion requests \nrelated to Citizens Sycamore’s interest in the Sycamore Project will be \ngoverned by the relevant provisions of the SDG&E TO Tariff. \n \nA. \nRelevant Existing TO Tariff Provisions \n \nCitizens Sycamore’s current TO Tariff recognizes the limited nature of \nits interest in the Sycamore Project.  Section 16.12 of Citizens Sycamore’s \ncurrent TO Tariff states that for so long as the Transfer Capability Lease \nbetween Citizens Sycamore and SDG&E is in effect, Sections 8 (“Obligation \nto Interconnect or Construct Transmission Expansions and Facility \nUpgrades”), 9 (“Expansion Process”), and 10 (“Interconnection Process”) of the \nCitizens Sunrise Tariff will be “superseded by the corresponding sections of \nthe TO Tariff of San Diego Gas & Electric.”5  Article III of the Transfer \nCapability Lease, which is included at Appendix II to the Sycamore TO \nTariff, outlines the division of responsibility between SDG&E and Citizens \nSycamore, with SDG&E retaining all responsibility for operation and \nmaintenance6 and to act as the interconnection agent for the Sycamore \nProject.7   \n \n \n4  \nShow Cause Order, 195 FERC ¶61,214 at P 38. \n5  \nSycamore TO Tariff Section 16.12. \n6  \nSection 3.2 of the Transfer Capability Lease, Appendix II to the Sycamore TO \nTariff. \n7  \nSection 3.6 of the Transfer Capability Lease, Appendix II to the Sycamore TO \nTariff."},{"page":4,"startToken":833,"endToken":1111,"text":"Duncan \n& Allen LLP \n- 4 - \n \nThese existing provisions illustrate that any responsibility for studying \nor serving large load customers or addressing the needs of co-located \narrangements is beyond the scope of Citizens Sycamore’s limited authority as \na non-load serving PTO with no end-use customers and a limited interest in a \nportion of a single transmission line segment within SDG&E’s system. \n \nB. \nProposed TO Tariff Provision Revisions \n \n \nIn response to the Show Cause Order, Citizens Sycamore is proposing a \nseries of revisions to its TO Tariff to ensure it is clear that when it comes to \nall interconnection matters, including interconnection and service of large \nload customers or co-located arrangements, the appropriate TO Tariff \nprovisions are those of SDG&E.  These revisions include the following: \n \n• Revisions to the definitions of Expedited Interconnection Agreement, \nFacilities Study Agreement, Facility or Facilities Study, \nInterconnection, Interconnection Agreement, Interconnection \nApplication, Reliability Upgrade, Requests for Expedited \nInterconnection Procedures, System Impact Study, and System Impact \nStudy Agreement, each to clarify that SDG&E’s TO Tariff provisions \nwill govern. \n \n• Added new language to Section 8, Obligations to Interconnect or \nConstruct Transmission and Expansions and Facility Upgrades, to \nconfirm that all conduct that falls under Section 8 will be governed by \nSDG&E’s TO Tariff. \n \n• Added new language to Section 9, Expansion Process, to confirm that \nall conduct that falls under Section 9 will be governed by SDG&E’s TO \nTariff. \n \n• Added new language to Section 10, Interconnection Process, to confirm \nthat all conduct that falls under Section 10 will be governed by \nSDG&E’s TO Tariff. \n \n• Citizens Sycamore additionally makes a series of administrative \nrevisions to address typos, update addresses, and similar type changes \nwith this filing."},{"page":5,"startToken":1111,"endToken":1324,"text":"Duncan \n& Allen LLP \n- 5 - \n \nEach of these revisions is shown in redline in Attachment B to this filing, \nwhich is a redline of the Citizens Sycamore TO Tariff.  A clean version of the \nrevised TO Tariff is included as Attachment A. \n \nCitizens Sycamore respectfully submits that these revisions address the \nconcerns raised in the Show Cause Order within the bounds of Citizens \nSycamore’s limited interest in, and control over, the Sycamore Project.  Put \nsimply, Citizens Sycamore is bound by the terms of its Transfer Capability \nLease with SDG&E, and that agreement makes it clear that SDG&E, as the \nowner and operator of the Sycamore Project, has the authority and \nresponsibility for all operational and interconnection related matters. \n \n \nTo the extent that the CAISO or SDG&E propose TO Tariff revisions \nthat impact the revisions Citizens Sycamore proposes in this filing, Citizens \nSycamore commits to making a compliance filing to ensure its TO Tariff \nremains consistent. \n  \n \nIII. \nREQUESTED EFFECTIVE DATE \n \nCitizens Sycamore requests an effective date for the revised TO Tariff \nof January 15, 2027. \n \nVIII. CONCLUSION \n \n \nCitizens Sycamore respectfully requests that the Commission accept \nthese proposed tariff revisions effective as of January 15, 2027, and \ndetermine that Citizens Sycamore has satisfied the concerns the Commission \nidentified in its Show Cause Order."},{"page":6,"startToken":1324,"endToken":1373,"text":"Duncan \n& Allen LLP \n- 6 - \n \n \n \n \n \n \n \nRespectfully submitted, \n \n \n \n \n \n \n \n \n/s/ Ashley M. Bond \n \n \n \n \n \n \n \n \nAshley M. Bond \n \n \n \n \n \n \nAmy E. McDonnell \nDuncan & Allen LLP \n1730 Rhode Island Ave. N.W. \nSuite 700 \nWashington, D.C.  20036 \n(202) 289-8400 \namb@duncanallen.com \naem@duncanallen.com \n \nCounsel for Citizens Sycamore-\nPenasquitos Transmission LLC  \n \nNovember 16, 2026"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":30,"startToken":0,"endToken":194},{"p":2,"at":30,"title":"I. BACKGROUND ON CITIZENS SYCAMORE","method":"printed heading","endPage":2,"endAt":1818,"startToken":194,"endToken":450},{"p":2,"at":1818,"title":"II. RESPONSE TO SHOW CAUSE ORDER","method":"printed heading","endPage":3,"endAt":825,"startToken":450,"endToken":641},{"p":3,"at":825,"title":"A. Relevant Existing TO Tariff Provisions","method":"printed heading","endPage":4,"endAt":404,"startToken":641,"endToken":893},{"p":4,"at":404,"title":"B. Proposed TO Tariff Provision Revisions","method":"printed heading","endPage":5,"endAt":995,"startToken":893,"endToken":1268},{"p":5,"at":995,"title":"III. REQUESTED EFFECTIVE DATE","method":"printed heading","endPage":5,"endAt":1125,"startToken":1268,"endToken":1287},{"p":5,"at":1125,"title":"VIII. CONCLUSION","method":"printed heading","endPage":6,"endAt":391,"startToken":1287,"endToken":1373}]}