{"document":{"slug":"rec-20261116-5110","title":"Tariff Revisions to Address Commission's EL26-71 Order to Show Cause","issued":"2026-11-16","accession":"20261116-5110","docket":"ER27-501-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Citizens S-Line Transmission LLC","kind":"tariff filing","file":"sources/filings/text/20261116-5110_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5110","tier":"record","sha256":"3d0dc86a8807f738e37305b782d5a921dc13b8d3c09417a605dfc620275216d5","pages":6,"tokens":1489,"emptyPages":[],"textThemes":["study"]},"pages":[{"page":1,"startToken":0,"endToken":224,"text":"Duncan \n&Allen LLP \n \n1730 Rhode Island Avenue, Northwest \nWashington, D.C. 20036 \nTelephone (202) 289-8400 \nFAX (202) 289-8450 \n \nCOUNSELLORS AT LAW \n \n \nNovember 16, 2026 \n \n \nVIA ELECTRONIC FILING \n \nDebbie-Anne A. Reese \n Secretary \nFederal Energy Regulatory Commission \n888 First Street, NW \nWashington, DC 20426 \n \nRe:  \nCitizens S-Line Transmission LLC Tariff Revisions to Address \nCommission’s Docket No. EL26-71 Order to Show Cause, Docket \nNo. ER27-_____-000 \n \nDear Secretary Reese: \n \nOn June 18, 2026 the Commission issued its Order Instituting \nProceeding Under Section 206 of the Federal Power Act (“Show Cause \nOrder”),1 requiring each Participating Transmission Owner (“PTO”) within \nthe California Independent System Operator’s (“CAISO”) system to address \nissues associated with serving large load and co-location arrangements.  In \nthis filing, pursuant to Section 205 of the Federal Power Act, Citizens S-Line \nTransmission LLC (“Citizens S-Line”) files proposed revisions to its \nTransmission Owner Tariff (“TO Tariff”) to address the issues raised in the \nShow Cause Order.  Citizens S-Line respectfully requests that the \nCommission accept these TO Tariff revisions to become effective January 15, \n2027, which is sixty (60) days from the date of this filing. \n \n \nI. \nBACKGROUND ON CITIZENS S-LINE \n \nCitizens S-Line is a wholly owned subsidiary of Citizens Energy \nCorporation, a non-profit organization dedicated to making life’s basic needs \nmore affordable through successful business ventures.  To date, Citizens \n \n1  \nCAISO et al., 195 FERC ¶61,214 (2026)."},{"page":2,"startToken":224,"endToken":555,"text":"Duncan \n& Allen LLP \n- 2 - \n \nEnergy Corporation has donated more than $600 million to programs \nsupporting the most vulnerable in our communities.   \n \nIn 2024 Citizens S-Line invested approximately $40 million with the \nImperial Irrigation District (“IID”) in the S-Line Upgrade Project (“S-Line \nProject”) in exchange for a 40-year leasehold interest in the incremental \ntransfer capability created by the S-Line Project.2  Citizens S-Line does not \nown any of the actual facilities.  IID retains ownership and operation and \nmaintenance responsibilities.  Citizens S-Line became a CAISO PTO, turned \nits interest in the S-Line Project over to the CAISO’s operational control as \nan Entitlement and recovers its costs through its TO Tariff.  As reflected in \nits TO Tariff, Citizens S-Line is a “Non-Load-Serving Participating TO and \nhas no End-Use Customers.”3 \n \nAs part of Citizens Energy Corporation’s charitable mission, Citizens \nS-Line is contractually committed to dedicate 50% of its net after-tax cash \nflow from the S-Line Project to programs assisting IID’s low-income families.  \nTo date, the S-Line Project has generated $1.1 million in charitable \ndonations, which are currently being used to support bill relief through IID’s \nSafety Net Program and to support critical social service organizations such \nas IID’s Neighborhood Partner Support Program.  Citizens S-Line estimates \nits involvement in the S-Line Project will generate approximately $18 million \nin charitable assistance over the term of the lease. \n \n \nII. \nRESPONSE TO SHOW CAUSE ORDER \n \n \nThe Commission’s Show Cause Order determined that the TO Tariffs \nof the CAISO PTOs, including Citizens S-Line, “lack provisions that address, \nwith sufficient clarity and consistency” how each PTO “will timely study…the \nprovision of transmission service to Eligible Customers on behalf of large \nloads.”4  The Commission directed each PTO to either justify why its TO \nTariff remained just and reasonable, or to provide TO Tariff revisions \nnecessary to remedy the Commission’s concerns.   \n \n2  \nS-Line TO Tariff Section 3.70 definition of “Project”. \n3  \nS-Line TO Tariff Section 1 “Preamble”. \n4  \nShow Cause Order, 195 FERC ¶61,214 at P 38."},{"page":3,"startToken":555,"endToken":917,"text":"Duncan \n& Allen LLP \n- 3 - \n \n \nAs discussed in more detail below, Citizens S-Line has a limited \nleasehold interest in an Entitlement to incremental transfer capacity \nassociated with a single upgrade project on the S-Line.   Ownership of the \ntransmission line, as well as responsibility for operating and maintaining the \nline, remains with IID.  For these reasons, Citizens S-Line proposes revisions \nto its TO Tariff to make clear that any study, planning, interconnection or \nexpansion requests related to Citizens S-Line’s interest in the S-Line Project \nwill be governed by the relevant provisions and policies of IID, including its \nOpen Access Transmission Tariff. \n \nCitizens S-Line additionally proposes revisions to its TO Tariff to make \nit consistent with the TO Tariffs of Citizens Sunrise Transmission LLC and \nCitizens Sycamore-Penasquitos Transmission LLC, two other CAISO PTOs \nthat are also wholly owned subsidiaries of Citizens Energy Corporation.  The \nS-Line transmission line is located within IID’s Balancing Authority Area \nand is therefore not within the footprint of the CAISO’s Balancing Authority \nArea, nor is IID a CAISO PTO.  As a result, Citizens S-Line’s interest in the \nProject is limited to an Entitlements interest in certain transmission \ncapacity, and it’s initial TO Tariff included more limited provisions than \nthose of Citizens Sunrise Transmission LLC or Citizens Sycamore-\nPenasquitos Transmission LLC, two other CAISO PTOs that are also wholly \nowned subsidiaries of Citizens Energy Corporation.  In particular, Citizens S-\nLine’s TO Tariff contained a more limited Section 3 (TO Definitions), Section \n8 (Obligations to Interconnect or Construct Transmission Expansions and \nFacility Upgrades), Section 9 (Expansion Process), and Section 10 \n(Interconnection Process). \n \nIn response to the Show Cause Order, Citizens S-Line is proposing \nrevisions that would expand these sections so that they mirror those of the \nother Citizens Energy Corporation PTOs, which Citizens S-Line believes will \nallow for more clarity on the provision of service to any large load or co-\nlocated arrangement. These revisions include the following: \n \n• Revisions to Section 3, (TO Definitions) to expand the definition \nsection, including, but not limited to adding definitions for Expedited \nInterconnection Agreement, Facilities Study Agreement, Facility or \nFacilities Study, Interconnection, Interconnection Agreement, \nInterconnection Application, Reliability Upgrade, Requests for \nExpedited Interconnection Procedures, System Impact Study, and"},{"page":4,"startToken":917,"endToken":1210,"text":"Duncan \n& Allen LLP \n- 4 - \n \nSystem Impact Study Agreement, each to clarify that IID’s policies and \nprovisions will govern.5 \n \n• Expanded and added new language to Section 8, Obligations to \nInterconnect or Construct Transmission and Expansions and Facility \nUpgrades, to confirm that all conduct that falls under Section 8 will be \ngoverned by IID’s policies and provisions. \n \n• Expanded and added new language to Section 9, Expansion Process, to \nconfirm that all conduct that falls under Section 9 will be governed by \nIID’s policies and provisions. \n \n• Expanded and added new language to Section 10, Interconnection \nProcess, to confirm that all conduct that falls under Section 10 will be \ngoverned by IID’s policies and provisions. \n \n• Add in a new Section 16.12 to address any potential conflict between \nthe TO Tariff and terms of the Incremental Capacity Lease between \nCitizens S-Line and IID.  This provision is similar to the provisions \nincluded in the TO Tariffs of Citizens Sunrise Transmission LLC and \nCitizens Sycamore Transmission LLC and is necessary to confirm that \nCitizens S-Line’s interest in the S-Line Project is limited by the terms \nof the Lease between IID and Citizens S-Line.  The Lease is included \nas Appendix II to the Citizens S-Line TO Tariff, and confirms that IID \nhas all ownership, operational and maintenance responsibilities,6 and \nthat any interconnections to the S-Line Project will be governed by the \nterms of the IID Open Access Transmission Tariff.7 \n \n \n5  \nCitizens S-Line proposes to add additional defined terms to ensure \nconsistency between its TO Tariff and those of Citizens Sunrise Transmission \nLLC and Citizens Sycamore-Penasquitos Transmission LLC. \n6  \nCitizens S-Line TO Tariff, Appendix II, Incremental Transfer Capability \nLease at Section 4.2. \n7  \nCitizens S-Line TO Tariff, Appendix II, Incremental Transfer Capability \nLease at Section 4.5."},{"page":5,"startToken":1210,"endToken":1441,"text":"Duncan \n& Allen LLP \n- 5 - \n \n• Citizens S-Line additionally makes a series of administrative revisions \nto address typos, update addresses, and similar type changes with this \nfiling. \n \nEach of these revisions is shown in redline in Attachment B to this filing, \nwhich is a redline of the Citizens S-Line TO Tariff.  A clean version of the \nrevised TO Tariff is included as Attachment A. \n \nCitizens S-Line respectfully submits that these revisions address the \nconcerns raised in the Show Cause Order within the bounds of Citizens S-\nLine’s limited interest in, and control over, the S-Line Project.  Put simply, \nCitizens S-Line is bound by the terms of its Incremental Transfer Capability \nLease with IID, and that agreement makes it clear that IID, as the owner \nand operator of the S-Line Project, has the authority and responsibility for all \noperational and interconnection related matters. \n \n \nTo the extent that the CAISO proposes TO Tariff revisions that impact \nthe revisions Citizens S-Line proposes in this filing, Citizens S-Line commits \nto making a compliance filing to ensure its TO Tariff remains consistent. \n  \nIII. \nREQUESTED EFFECTIVE DATE \n \nCitizens S-Line requests an effective date for the revised TO Tariff of \nJanuary 15, 2027. \n \nVIII. CONCLUSION \n \n \nCitizens S-Line respectfully requests that the Commission accept these \nproposed tariff revision effective as of January 15, 2027, and determine that \nCitizens S-Line has satisfied the concerns the Commission identified in its \nShow Cause Order."},{"page":6,"startToken":1441,"endToken":1489,"text":"Duncan \n& Allen LLP \n- 6 - \n \n \n \n \n \n \n \nRespectfully submitted, \n \n \n \n \n \n \n \n \n/s/ Ashley M. Bond \n \n \n \n \n \n \n \n \nAshley M. Bond \n \n \n \n \n \n \nAmy E. McDonnell \nDuncan & Allen LLP \n1730 Rhode Island Ave. N.W. \nSuite 700 \nWashington, D.C.  20036 \n(202) 289-8400 \namb@duncanallen.com \naem@duncanallen.com \n \nCounsel for Citizens S-Line \nTransmission LLC  \n \nNovember 16, 2026"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":1289,"startToken":0,"endToken":181},{"p":1,"at":1289,"title":"I. BACKGROUND ON CITIZENS S-LINE","method":"printed heading","endPage":2,"endAt":1537,"startToken":181,"endToken":447},{"p":2,"at":1537,"title":"II. RESPONSE TO SHOW CAUSE ORDER","method":"printed heading","endPage":5,"endAt":1134,"startToken":447,"endToken":1385},{"p":5,"at":1134,"title":"III. REQUESTED EFFECTIVE DATE","method":"printed heading","endPage":5,"endAt":1262,"startToken":1385,"endToken":1404},{"p":5,"at":1262,"title":"VIII. CONCLUSION","method":"printed heading","endPage":6,"endAt":377,"startToken":1404,"endToken":1489}]}