{"document":{"slug":"rec-20261116-5249","title":"Proposed TO Tariff Revisions","issued":"2026-11-16","accession":"20261116-5249","docket":"ER27-512-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"DCR Transmission, L.L.C.","kind":"tariff filing","file":"sources/filings/text/20261116-5249_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5249","tier":"record","sha256":"b116947ffb9036139313d20dbc2fc835aca99c9ccb1bfb06fe18f925680dcb51","pages":307,"tokens":112872,"emptyPages":[],"textThemes":["study","cost","credit","colo"]},"pages":[{"page":1,"startToken":0,"endToken":370,"text":"Eversheds Sutherland (US) LLP\n700 Sixth Street, NW, Suite 700\nWashington, DC 20001-3980\nT: 202.383.0915\njoehall@eversheds-sutherland.com\n \n \n \nEversheds Sutherland (US) LLP is part of a global legal practice, operating through various separate and distinct legal entities, under \nEversheds Sutherland.  For a full description of the structure and a list of offices, please visit www.eversheds-sutherland.com. \n \nNovember 16, 2026 \nVIA E-TARIFF \nHonorable Debbie-Anne A. Reese  \nSecretary \nFederal Energy Regulatory Commission  \n888 First Street, NE \nWashington, DC 20426 \nRe: \nDCR Transmission, L.L.C., Docket No. ER27-____-000 \nProposed Transmission Owner Tariff Revisions to Implement Large Load \nInterconnection Process and Agreements \nDear Secretary Reese: \nPursuant to Section 205 of the Federal Power Act (“FPA”)1 and sections 35.3 and 35.13 of \nthe Federal Energy Regulatory Commission’s (“Commission” or “FERC”) regulations,2 and in \ncompliance with the Commission’s June 18, 2026, order to show cause (“OSC Order”) issued  to \nthe California Independent System Operator Corporation (“CAISO”) and the CAISO Participating \nTransmission Owners (“PTOs”),3 DCR Transmission, L.L.C. (“DCRT”) hereby submits proposed \nrevisions to its Transmission Owner Tariff (“TO Tariff”)4 to address issues regarding large loads \nidentified by the Commission’s OSC Order (“Large Loads”).5  As explained herein, DCRT’s \nproposed TO Tariff revisions are just and reasonable and comply with the OSC Order.  DCRT \nrespectfully requests that the Commission accept the proposed Tariff revisions, to be effective \nFebruary 15, 2027.6   \n \n1 16 U.S.C. § 824d. \n2 18 C.F.R. §§ 35.3, 35.13 (2026). \n3 Cal. Indep. Sys. Operator Corp., 195 FERC ¶ 61,214 (2026) (“OSC Order”). \n4 DCR Transmission, L.L.C., Transmission Owner Tariff, available in FERC eTariff (“DCRT TO Tariff”).  \n5 See OSC Order, at PP 6, 31. \n6 See 18 C.F.R. § 35.3(a)(1).  From DCRT’s understanding, the CAISO plans to request that its tariff provisions \nsubmitted in compliance with the OSC Order be subject to a ninety (90) day notice period, so that the CAISO’s tariff \nrevisions go into effect on February 15, 2027.  DCRT is requesting the same notice period for this filing, so that \nDCRT’s proposed Tariff revisions go into effect on the same date as the CAISO’s proposed Tariff revisions. This"},{"page":2,"startToken":370,"endToken":783,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 2 \n \n \nI. \nBACKGROUND \nA. \nDCRT \nDCRT owns and operates the 125-mile, 500 kilovolt Ten West Link Transmission Line \n(“Ten West Link”), which runs from Arizona Public Service Company’s (“APS”) Delaney \nSubstation, in Maricopa County, Arizona, to Southern California Edison Company’s (“SCE”) \nColorado River Substation, in Riverside County, California.  DCRT has transferred operational \ncontrol of Ten West Link to the CAISO pursuant to the CAISO’s Transmission Control Agreement \nand is a PTO subject to that agreement.7 DCRT also maintains its own TO Tariff.8   \nTen West Link entered commercial operation on June 12, 2024, and is currently one of the \nfew transmission interconnections between Arizona and Southern California.  Approximately 100 \nmiles of Ten West Link are in Arizona. \nB. \nCommission’s Show Cause Order  \nOn June 18, 2026, the Commission issued orders to each of the six Independent System \nOperators (“ISOs”) and Regional Transmission Organizations (“RTOs”) over which it exercises \njurisdiction and the PTOs within those ISOs and RTOs.9  These orders addressed potential \ndeficiencies identified by the Commission regarding the integration of Large Loads onto the bulk \npower system.10  One such order was directed at the CAISO and the CAISO PTOs.  DCRT is one \nsuch PTO within the CAISO and, therefore, subject to the Commission’s OSC Order.11  \nIn the OSC Order, the Commission directed the CAISO and the CAISO PTOs, as \napplicable, to address the requirements for Large Load interconnections, either through proposed \ntariff revisions or an explanation for why such revisions to existing tariffs are not needed.12  The \nCommission requested that the CAISO address the following:  \n• Rates, terms, and conditions of service that apply to interconnection customers serving co-\nlocated Large Load to address: \n• The scope of the analyses the CAISO performs as part of its existing study process \nto evaluate the impacts of co-location arrangements, which may need to account \nfor any potential dynamic impacts of co-located Large Loads and any potential \n \nfacilitates consistency between DCRT’s proposed Large Load Tariff revisions and related tariff revisions submitted \nby the CAISO. \n7 See Letter Order accepting revisions to CAISO Transmission Control Agreement adding DCRT as signatory, Cal. \nIndep. Sys. Operator Corp., 187 FERC ¶ 61,134 (2024).  \n8 See DCRT TO Tariff. \n9 See OSC Order, at P 2 n.2. (Chairman Swett Concurrence). \n10 See OSC Order, at PP 1–3. \n11 See OSC Order, at P 2 n.9. \n12 See OSC Order, at PP 6, 31, 39–105."},{"page":3,"startToken":783,"endToken":1102,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 3 \n \n \nimpacts of requests to modify an existing generating facility’s interconnection \nservice level to serve co-located Large Loads on transmission system reliability; \n• The potential that Eligible Customers,13 on behalf of Large Load, may not be \nrequired to pay for wholesale transmission services that they receive, as required \nby the cost causation principle; \n• Netting Behind-the-Meter Generation (“BTMG”) against its Large Load for \npurposes of calculating Regional Access Charges; \n• Generator interconnection service(s) that reflects the operational dynamics of \nserving either an electrically proximate Large Load or a co-located load that has a \nhigh peak load; and  \n• Transmission services that reflect that an Eligible Customer taking transmission \nservice on behalf of Large Load is willing and able to limit its energy withdrawals \nfrom the transmission system under certain conditions, such as:  \no An interim non-firm network transmission service while Network Upgrades \nare being constructed (i.e., interim Network Integration Transmission \nService (“NITS”)); and \no Permanent firm and non-firm contract demand transmission services \n(transmission service up to a specified megawatt (“MW”) quantity, i.e., the \ncontract level, on a firm or non-firm basis).14 \nThe Commission requested that the CAISO and the CAISO PTOs address the following:  \n• \nA definition of Large Load sufficient to capture loads that present the unique \nchallenges described in the OSC Order; \n• \nThe application process for requesting transmission service to Eligible Customers \non behalf of Large Loads; \n• \nProcedures for studying the provision of transmission service to Large Loads that: \no Identify which party will be responsible for conducting such studies; \no Consider the unique characteristics and impacts of Large Loads on the \ntransmission system, including Large Loads that are able to limit their \nenergy withdrawals under certain conditions, which may thereby lessen or \npotentially avoid the need for certain Network Upgrades; \n \n13 See OSC Order, at P 3 n.12. \n14 See OSC Order, at P 105."},{"page":4,"startToken":1102,"endToken":1436,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 4 \n \n \no Deter speculative or duplicative requests for transmission service by \nEligible Customers on behalf of Large Loads; \no Are timely completed within 60–90 days; \no Require the evaluation of Alternative Transmission Technologies (“ATTs”) \nin studies for the provision of transmission service, using models that are \ncapable of evaluating the transmission system to accurately account for \nATTs, in all instances, without the need for a request from the Eligible \nCustomer seeking transmission service on behalf of a Large Load; and  \no If traditional Network Upgrades are selected instead of ATTs, inclusion in \nthe relevant study report to the Eligible Customer seeking transmission \nservice on behalf of a Large Load of a sufficiently clear demonstration of \nwhy ATTs are not feasible (i.e., would not resolve reliability violations \nidentified or meet the relevant planning criteria) or would not result in lower \ncosts or a faster timeline for accommodating the transmission service \nrequest;  \n• \nOngoing operational requirements for transmission customers serving Large Loads \nnecessary to ensure reliable operation of the transmission system;  \n• \nPro forma provisions in transmission service agreements, or other applicable \nagreements, to memorialize the procedures listed above; \n• \nMechanisms to mitigate the risk of cost-shifting among transmission customers, \nwhich may result in unjust and unreasonable rates for transmission; \n• \nProvision of data on the CAISO’s website in a single location, and in an easily \naccessible format that is searchable and allows users to filter the data, on \ntransmission service provided to Eligible Customers on behalf of Large Loads, for \nNetwork Upgrades evaluated in the local transmission planning process that are \nneeded to accommodate transmission service to Eligible Customers on behalf of \nthose Large Loads, and the costs for those Network Upgrades.15 \nThe Commission recommended that the CAISO and the CAISO PTOs coordinate amongst \neach other in the development of the relevant Tariff provisions for compliance with the OSC \nOrder’s directives.16  \n \n15 See OSC Order, at P 66. \n16 See OSC Order, at P 37."},{"page":5,"startToken":1436,"endToken":1806,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 5 \n \n \nC. \nDRCT’s Understanding of the CAISO’s Position \nBased on the OSC Order, DCRT participated in the CAISO’s stakeholder process for the \nCAISO PTOs to coordinate the CAISO’s and the CAISO PTO’s compliance filing in response to \nthe OSC Order.  As recommended by the Commission,17 the CAISO and the CAISO PTOs \ncoordinated the development of their respective tariff revisions.18 The CAISO and the CAISO \nPTOs held weekly coordination meetings where the CAISO PTOs and the CAISO could apply \nshared technical expertise to the Commission’s identified issues and revise internal draft proposals \nbefore dissemination to the public for comments via the CAISO’s stakeholder process.  The \nCAISO PTOs also held regular meetings amongst themselves to apply shared expertise and jointly \naddress CAISO PTO-specific issues where possible.  The CAISO utilized its existing stakeholder \nprocesses to develop its proposed tariff revisions. \nThrough participation in the CAISO’s coordination process and standard stakeholder \nprocess, DCRT understands the CAISO’s position with respect to the OSC Order to be that: \n• \nThe CAISO will define Large Loads as those that are 50 MW or greater and \ninterconnected with the CAISO Controlled Grid, which definition DCRT will \nadopt; \n• \nThe CAISO PTOs will address load interconnection procedures (including for \nLarge Loads), including for co-located Large Loads, as is the current practice \nwithin the CAISO; \n• \nThe CAISO will address interconnection of generators that export power to the \nCAISO Controlled Grid, including for co-located generation, as is the current \npractice within the CAISO; \n• \nThe CAISO PTOs will address the risk of cost-shifting among Eligible Customers; \n• \nThe CAISO and the CAISO PTOs will jointly address ongoing operational \nrequirements for Large Loads; \n• \nThe CAISO and the CAISO PTOs will jointly address the provision of interim non-\nfirm interconnection service through the Flexible Interim Load Interconnection \n(“FILI”) Service; \n• \nLarge Load developers have not expressed interest in permanent non-firm \ntransmission service to any of the CAISO PTOs; therefore, such a transmission \nservice is not warranted at this time; \n \n17 See OSC Order, at P 37. \n18 Publicly available information about the CAISO Large Load Initiative stakeholder proceedings may be found at the \nfollowing link to the CAISO internet website: https://stakeholdercenter.caiso.com/StakeholderInitiatives/Large-loads."},{"page":6,"startToken":1806,"endToken":2256,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 6 \n \n \n• \nThe CAISO and the CAISO PTOs will jointly address provision of data on the \nCAISO’s website in a single location, and in an easily accessible format that is \nsearchable and allows users to filter the data, on transmission service provided to \nEligible Customers on behalf of Large Loads, for Network Upgrades evaluated in \nthe local transmission planning process that are needed to accommodate \ntransmission service to Eligible Customers on behalf of those Large Loads, and the \ncosts for those Network Upgrades; and  \n• \nSpecific study procedures for generator interconnection regarding electrically \nproximate Large Loads are not necessary because the CAISO is not capacity-\nconstrained. \nThe CAISO’s and the CAISO PTO’s coordination processes were dynamic, with many \nopinions and perspectives shared and vigorous debates among the parties.  DCRT understands the \nopinions of the other parties but tailored its proposed tariff revisions to its unique situation as a \nsingle-asset PTO whose transmission line traverses the California-Arizona border.  DCRT’s filing \nreflects DCRT’s understanding of how the CAISO envisions the split of responsibilities between \nthe CAISO and the CAISO PTOs for purposes of Large Load interconnection based on the OSC \nOrder.  \nFrom DCRT’s understanding, the CAISO will not revise its offering of transmission \nproducts for Large Load interconnection.19  DCRT, as a PTO, cannot independently offer specific \ntransmission products under the DCRT TO Tariff that may be inconsistent with services provided \nby the CAISO. Therefore, DCRT has not proposed additional or revised transmission services in \nthis filing.20   \nII. \nDCRT’S PROPOSED TARIFF REVISIONS ARE JUST AND REASONABLE \nAND COMPLY WITH THE DIRECTIVES OF THE OSC ORDER \nA. \nThe Interconnection Study Process Proposed in DCRT’s TO Tariff, Appendix IV \nand Large Load Interconnection Agreement Satisfies the Directives of the OSC \nOrder \nIn the OSC Order, the Commission preliminarily found that the CAISO Tariff and/or the \nTO Tariffs appear to be unjust and unreasonable because they lack sufficiently clear and consistent \nprovisions establishing the application process and study procedures that will be used to evaluate \nthe provision of transmission service to Eligible Customers on behalf of Large Loads.21  The \nCommission explained its concern that, absent such provisions, existing processes may not be \n \n19 See CAISO Draft Final Proposal, Large Load Enhancements, September 24, 2026 at 67, available at \nhttps://stakeholdercenter.caiso.com/InitiativeDocuments/Draft-Final-Proposal-Large-Load-Enhancements-Sep-24-\n26.pdf (“The CAISO does not propose to create new ‘transmission services’ or more responsibilities around eligible \ncustomers, which would require redesigning transmission and interconnection service entirely. The CAISO does not \nbelieve such a redesign is warranted.”). \n20 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, at Art. 4.4. \n21 See OSC Order, at PP 49-53, 58."},{"page":7,"startToken":2256,"endToken":2782,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 7 \ndescribed with the clarity and specificity necessary to mitigate the operational risks of serving \nLarge Loads, avoid disputes regarding how Large Load-related studies are conducted, deter \nspeculative or duplicative requests for transmission service, and help avoid excessive and \nunnecessary Network Upgrades.22   \nDCRT proposes to add a new Appendix IV to its TO Tariff to directly respond to each of \nthese concerns, as described below.23 The new Appendix IV includes a new Large Load \nInterconnection Process (“LLIP”) which details the interconnection process required for Large \nLoads to interconnect to Ten West Link for purposes of taking transmission service over the \nCAISO system, and includes a new pro forma Large Load Interconnection Agreement (“LLIA”). \nThe combination of DCRT’s new LLIP and LLIA provide the level of transparency and detail \nsought in the OSC Order for the Large Loads, so transmission-related services are provided in a \njust, reasonable and not unduly discriminatory manner.  \n1.\nClear Assignment of Study Responsibility\nIn the OSC Order, the Commission expressed concern that the CAISO Tariff and/or the \nTO Tariffs may not clearly specify which entity will be responsible for studying the provision of \ntransmission service to Eligible Customers on behalf of Large Loads.24  DCRT will not be \nadministrating transmission service to Large Load Interconnection Customers. The CAISO will \nbe providing that service. DCRT will be providing interconnection to Large Loads. DCRT’s \nproposed Tariff revisions clearly assign responsibilities for the LLIP and state that DCRT will \nprocess Large Load interconnections.  DCRT TO Tariff, proposed Appendix IV, Section 2 \nobligates DCRT to perform the two studies that frame Large Load interconnections: the Large \nLoad System Impact Study, and the Large Load Facilities Study.25  By memorializing this \nobligation in its TO Tariff, DCRT provides Large Load Interconnection Customers with certainty \nas to which entity is accountable for each phase of the Large Load study process.  \n2.\nRolling Application Process\nIn the OSC Order, the Commission directed the CAISO and the PTOs to explain whether \ntheir tariffs remain just and reasonable without, among other things, an application process that \naccepts Eligible Customers’ applications for transmission service on behalf of Large Loads on a \nrolling basis.26  DCRT’s proposed Tariff revisions establish a rolling application process for Large \nLoad interconnections.  DCRT TO Tariff, new Appendix IV, Section 1.2 provides that DCRT will \n22 See OSC Order, at P 49. \n23 DCRT notes that, as stated above, its transmission facilities interconnect with the SCE and APS transmission \nsystems.  Appendix A of DCRT’s LLIA expressly states that DCRT will coordinate with the Large Load \nInterconnection Customers to ensure that all local state utility franchise rules and regulations are adhered to through, \namong other things, arrangements that provide for station service directly from the local franchised public \nutility.  Appendix A also provides that DCRT will coordinate with the Large Load Interconnection Customer to \nfacilitate any necessary pseudo-tie or similar arrangement for the delivery of power into the CAISO BAA.  \n24 See OSC Order, at P 51.  \n25 See DCRT TO Tariff, proposed Appendix IV, LLIP, at § 2. \n26 See OSC Order, at P 58."},{"page":8,"startToken":2782,"endToken":3281,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 8 \n \n \ntime-stamp each application upon receipt to establish study priority.27  This approach permits \nLarge Load Interconnection Customers to submit applications whenever their projects are ready, \nrather than awaiting a periodic window, while providing an objective, transparent, and non-\ndiscriminatory basis for determining the order in which requests will be studied. \n3. \nNon-Refundable Application and Study Fees \nIn the OSC Order, the Commission identified a non-refundable application fee as one tool \nto deter duplicative or speculative requests for transmission service on behalf of Large Loads.28  \nDCRT’s proposed Tariff revisions include meaningful non-refundable fees for Large Load \ninterconnections.  DCRT TO Tariff, proposed Appendix IV, Section 1.4.2 provides for a non-\nrefundable application fee of two-hundred-thousand dollars ($200,000) that also covers the Large \nLoad System Impact Study fees, and Section 2.3.2 establishes a non-refundable study fee of two-\nhundred-thousand dollars ($200,000) for the Large Load Facilities Study.  For both studies, the \nLarge Load Interconnection Customer is obligated to reimburse DCRT for any study costs in \nexcess of the default fee.29  Moreover, by requiring the Large Load Interconnection Customer to \nbear study costs in excess of the fee, the proposed revisions ensure that the cost of studying a Large \nLoad request is borne by the requesting party rather than by DCRT’s other customers. \n4. \nReadiness Requirements  \nIn the OSC Order, the Commission preliminarily found that sufficient readiness \nrequirements that escalate at distinct phases of the study process (e.g., meaningful milestones \nand/or financial commitments) may be necessary to deter duplicative or speculative requests for \ntransmission service.30  DCRT’s proposed Tariff revisions establish readiness requirements that \nescalate as an application progresses through the study process for Large Load interconnections.  \nDCRT TO Tariff, proposed Appendix IV provides several readiness tools, including: (1) evidence \nof site control; (2) an attestation by an officer of the Large Load Interconnection Customer; (3) a \ndeadline by which the Large Load Interconnection Customer must elect to proceed following the \ncompletion of each study phase, failing which the application will be deemed withdrawn; and (4) \na limit of one amendment to the application.31   \nDCRT also has proposed requiring detailed dynamic models as part of the Large Load \nInterconnection Customer’s initial application and an initial sufficiency review of applications.32 \nSuch models require meaningful effort and expertise to create, helping filter out speculative \nrequests.  Lastly, DCRT is proposing that Large Load Interconnection Customers be required to \n \n27 See DCRT TO Tariff, proposed Appendix IV, LLIP, at § 1.2. \n28 See OSC Order, at P 58. \n29 See DCRT TO Tariff, proposed Appendix IV, LLIP, at §§ 2.2.1, 2.3.2. \n30 See OSC Order, at PP 55, 58. \n31 See DCRT TO Tariff, proposed Appendix IV, LLIP, at §§ 1.4(x)(q)–(r), 1.4.3, 2.2.2, 2.3.1, 2.5.1. \n32 See DCRT TO Tariff, proposed Appendix IV, LLIP, at § 1.4(x)(o)–(p)."},{"page":9,"startToken":3281,"endToken":3754,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 9 \n \n \npost financial security at three specific milestones or the application will be withdrawn.  The details \nof these security postings are addressed in proposed Appendix IV, Attachment 4.  \nTogether, these readiness requirements ensure that only those interconnection requests that \nare genuinely viable, and that the Large Load Interconnection Customer is prepared to pursue, \ncontinue to consume study resources.  This protects the integrity of the study queue for all Large \nLoad Interconnection Customers and reduces the risk that Network Upgrades are planned for Large \nLoads that never materialize. \n5. \nEvaluation of ATTs \nIn the OSC Order, the Commission preliminarily found that the CAISO Tariff and/or the \nTO Tariffs appear to be unjust and unreasonable because they lack clear and consistent provisions \nrequiring the evaluation of ATTs as potential solutions to accommodate an Eligible Customer’s \nrequest for transmission service on behalf of a Large Load.33 Specifically, the Commission directed \nthe CAISO and the CAISO PTOs to explain whether their tariffs remain just and reasonable \nwithout provisions that: (1) require the evaluation of ATTs in studies for the provision of \ntransmission service, using models that are capable of evaluating the transmission system to \naccurately account for advanced transmission technologies, in all instances, without the need for a \nrequest from the Eligible Customer seeking transmission service on behalf of a Large Load; and \n(2) if traditional Network Upgrades are selected instead of ATTs, require inclusion in the study \nreport to the Eligible Customer of a sufficiently clear demonstration as to why ATTs are not \nfeasible (i.e., would not resolve reliability violations identified or meet the relevant planning \ncriteria) or would not result in lower costs or a faster timeline for accommodating the transmission \nservice request.34  In so doing, the Commission explained that ATTs can add capacity on existing \ntransmission lines quickly, often within one to three years, which may be more preferable for Large \nLoads.35 \nFor purposes of the OSC Order, the Commission defined ATTs to include static \nsynchronous compensators, static VAR compensators, advanced power flow control devices, \ntransmission switching, synchronous condensers, voltage source converters, advanced conductors, \ntower lifting, and dynamic line ratings, and noted that the Commission has also referred to these \ntechnologies as Grid Enhancing Technologies.36  DCRT’s proposed Tariff revisions address the \nCommission’s directives regarding the evaluation of ATTs.   DCRT’s proposed Tariff revisions \ninclude study procedures that will evaluate whether such technologies can resolve identified \nreliability needs when evaluating the transmission upgrades necessary to interconnect a new Large \nLoad, and set forth the decision-making process for determining when to utilize an ATT rather \nthan a traditional transmission upgrade. \n \n33 See OSC Order, at P 60. \n34 See OSC Order, at PP 61, 126. \n35 See OSC Order, at P 60.  \n36 See OSC Order, at P 60 n.154."},{"page":10,"startToken":3754,"endToken":4282,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 10 \n \n \nImportantly, the Commission emphasized that it is not mandating the use of ATTs.37 \nRather, the Commission’s directive is that ATTs be evaluated and, where they are not selected, \nthat the basis for that determination be transparently explained to the Eligible Customer.38  \nTo comply with the Commission’s directives regarding ATTs, DCRT’s proposed Tariff \nrevisions explicitly state that ATTs, as defined in the OSC Order, will be considered, as applicable, \nduring the Large Load System Impact Study and the Large Load Facilities Study when evaluating \nnecessary transmission upgrades.39  DCRT’s revisions also explain the decision-making process \nfor when to utilize an ATT versus a traditional transmission upgrade to ensure reliability while \ninterconnecting a new Large Load.40  Specifically, if a traditional Network Upgrade solution is \nselected instead of ATTs, the study report will explain why ATTs are not feasible, ensuring that \nATTs are appropriately considered during the study process.41 DCRT’s proposal will ensure that \nATTs receive a meaningful evaluation in every Large Load study, while preserving DCRT’s \nengineering judgment to select the solution that will reliably and cost-effectively accommodate \nthe requested service on DCRT’s single-line system. \n6. \nStudy Timelines  \nThe OSC Order preliminarily found that the CAISO’s Tariff and/or the TO Tariffs appear \nto be unjust and unreasonable because they lack provisions that address, with sufficient clarity and \nconsistency, how the CAISO and/or the CAISO PTOs will timely study (i.e., within 60–90 days \nof receiving the request) the provision of transmission service to Eligible Customers on behalf of \nLarge Loads.42  DCRT’s proposed Tariff revisions address the OSC Order’s directives for purposes \nof Large Load interconnection study timelines.   \nDCRT’s proposed Tariff revisions meet the 90-day study deadline directed by the OSC \nOrder by specifying the following benchmarks for the application and study process: (1) \nsufficiency review of the initial application to take five (5) business days, averaging 7 calendar \ndays; (2) if deficiencies are identified, three (3) business days for the Large Load Interconnection \nCustomer to cure the deficiencies; (3) five (5) calendar days to review any re-submitted \napplication; (4) seven (7) calendar days for DCRT to execute the Large Load System Impact Study \nAgreement and conduct an initial scoping meeting with the Large Load Interconnection Customer; \n(5) concurrently with step 4, thirty (30) days to conduct the Large Load System Impact Study and \nsubmit a study report; (6) seven (7) days for the Large Load Interconnection Customer to review \nthe Large Load System Impact Study report and execute a Large Load Facilities Study Agreement; \nand (7) thirty (30) days for DCRT to conduct the Large Load Facilities Study and submit a report.43  \n \n37 See OSC Order, at P 61. \n38 Id. \n39 See DCRT TO Tariff, proposed Appendix IV, LLIP, at § 2.4. \n40 See DCRT TO Tariff, proposed Appendix IV, LLIP, at § 2.4. \n41 See DCRT TO Tariff, proposed Appendix IV, LLIP, at § 2.4.  \n42 See OSC Order, at P 38. \n43 See DCRT TO Tariff, proposed Appendix IV, LLIP, at §§ 2.1, 2.1.1, 2.1.2, 2.2, 2.2.2, 2.3.1."},{"page":11,"startToken":4282,"endToken":4823,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 11 \n \n \nIn total, these steps will average roughly 85 calendar days from start to finish, meeting the OSC \nOrder’s target of 60–90 days. \nB. \nOverview of DCRT’s Pro Forma Large Load Interconnection Agreement \nDCRT TO Tariff, proposed Appendix IV, Attachment 3, includes DCRT’s proposed pro \nforma LLIA, generally modeled on the CAISO’s pro forma Large Generator Interconnection \nAgreement (“LGIA”), set forth in the CAISO Tariff, Appendix EE, which has been accepted by \nthe Commission.44  In developing its proposed  LLIA, DCRT began with the CAISO LGIA and \nremoved those provisions that are specific to the interconnection and operation of generating \nfacilities and have no application to a Large Load—for example, provisions addressing power \nsystem stabilizers, generator reactive power and primary frequency response obligations (replaced \nwith a composite power factor requirement for the Large Load Facility), the Merchant Option, data \nrequirements for Variable Energy Resources, and the interconnection requirements for \nAsynchronous Generating Facilities.45 At the same time, DCRT retained the interconnection and \nNetwork Upgrade concepts of the CAISO pro forma LGIA that apply equally to the \ninterconnection of a Large Load, including the provisions governing Interconnection Facilities, \nNetwork Upgrades, and Distribution Upgrades; the engineering, procurement, and construction of \nsuch facilities; the Scoping Meeting; coordination with, and agreements involving, Affected \nSystems; milestones and financial security; and the provision of construction status reports to the \nCAISO.  DCRT took this approach deliberately, so that the terminology, structure, and allocation \nof responsibilities among the CAISO, DCRT, and the Large Load Interconnection Customer in the \nLLIA remain consistent with those in the Commission-accepted CAISO LGIA.  Doing so \npromotes clarity and consistency across the CAISO footprint, allows Large Load Interconnection \nCustomers, the CAISO, and other market participants to rely on familiar and well-understood \ncontractual terms, and minimizes the risk of disputes regarding the meaning of defined terms—\nconsistent with the Commission’s emphasis in the OSC Order on clear and consistent tariff \nprovisions.46  The DCRT proposed LLIA is different from the CAISO pro forma LGIA in certain \nprovisions that reflect DCRT’s unique circumstances, most notably that DCRT’s single \ntransmission line interconnects the CAISO Controlled Grid with the APS franchised service \nterritory in Arizona.  \nBeyond the study, application, cost-responsibility, and FILI provisions addressed \nelsewhere in this transmittal letter and in the DCRT TO Tariff, the LLIA contains a number of key \nregulatory provisions, each carried over from, and consistent with, the corresponding provisions \nof the Commission-accepted CAISO LGIA.  First, the proposed DCRT LLIA becomes effective \nupon execution by all Parties subject to acceptance by the Commission or, if filed unexecuted, on \nthe date specified by the Commission, and DCRT will file the LLIA and any amendments with the \n \n44 Cal. Indep. Sys. Operator Corp., Docket Nos. ER23-1977-000, et al., Letter Order (issued July 20, 2023) (accepting \nrevisions to CAISO Open Access Transmission Tariff, Appendix EE (“CAISO pro forma LGIA”)).  The CAISO Tariff \nis available in FERC eTariff. \n45 The sections of the CAISO pro forma LGIA that DCRT did not use in its proposal are CAISO Tariff, App. EE, at \n§§ 4.6, 5.1.5, 5.4, 8.4, 9.6, 11.4.1.4, and App. H.  \n46 See OSC Order, at PP 49, 54."},{"page":12,"startToken":4823,"endToken":5393,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 12 \n \n \nCommission as required.47  Second, and importantly in light of the CAISO’s unique transmission \nservice framework, the LLIA makes clear that its execution does not constitute a request for, or \nthe provision of, any transmission service under the CAISO Tariff and does not convey any right \nto receive electricity at any specific point of delivery; transmission service remains available only \nthrough the CAISO’s existing processes.48  Third, the proposed DCRT LLIA requires each Party \nto perform its obligations in accordance with Applicable Laws and Regulations, Applicable \nReliability Standards, and Good Utility Practice, and to comply with the Emergency Condition \nprocedures of the CAISO, the North American Electric Reliability Corporation (“NERC”), and the \napplicable Regional Reliability Council, while preserving the authority of DCRT to take actions \nnecessary to preserve the reliability of the DCRT Transmission System during an Emergency \nCondition, including reduction or disconnection of the interconnection.49  Fourth, the proposed \nDCRT LLIA preserves the Parties’ respective rights to make unilateral filings under FPA sections \n205 and 206.50  Collectively, these provisions ensure that the rights and obligations of the Parties \nunder the LLIA are transparent, enforceable, and subject to the Commission’s continuing \noversight.  \nIn addition to these regulatory provisions, DCRT’s proposed LLIA contains the standard \ncommercial provisions found in the Commission-accepted CAISO LGIA, adapted only as \nnecessary to apply to a Large Load rather than a generating facility.  These include: (1) invoicing, \npayment, and billing-dispute procedures, including the requirement that a Party continue \nperformance during a billing dispute so long as undisputed amounts are paid and disputed amounts \nare paid or placed in escrow, with interest calculated under the Commission’s regulations;51 (2) \ntermination procedures and the Large Load Interconnection Customer’s responsibility for \ntermination costs, including costs incurred or irrevocably committed for the construction of \nDCRT’s Interconnection Facilities and Network Upgrades;52 (3) default and cure provisions \naffording a Breaching Party thirty (30) Calendar Days, or up to ninety (90) Calendar Days for a \nbreach not capable of earlier cure, to remedy a Breach before the non-breaching Party may \nterminate;53 (4) force majeure;54 (5) mutual indemnification, a mutual waiver of special, indirect, \n \n47 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, at Arts. 2.1, 3.1; CAISO Tariff, App. EE, LGIA, \nat §§ 2.1, 3.1. \n48 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, at Art. 4.4; CAISO Tariff, App. EE, LGIA, at \n§ 4.4; see also OSC Order, at PP 19, 25.  \n49 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, at Arts. 4.3, 13.2, 13.5.2; CAISO Tariff, App. \nEE, LGIA, at §§ 4.3, 13.2, 13.5. \n50 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, at Art. 30.11; CAISO Tariff, App. EE, LGIA, \nat § 30.11. \n51 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, at Arts. 12.1-12.4; CAISO Tariff, App. EE, \nLGIA, at §§ 12.1-12.4. \n52 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, at Arts. 2.3-2.4; CAISO Tariff, Appendix EE, \nLGIA, at Arts. 2.3-2.4. \n53 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, at Art. 17; CAISO Tariff, App. EE, LGIA, at § \n17. \n54 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, Art. 16; CAISO Tariff, App. EE, LGIA, at § \n16."},{"page":13,"startToken":5393,"endToken":5909,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 13 \n \n \nincidental, consequential, and punitive damages, and minimum insurance requirements, including \nworkers’ compensation, commercial general liability, business automobile liability, and excess \nliability coverage, with provision for self-insurance by qualifying Parties;55 (6) restrictions on \nassignment without consent, subject to customary exceptions for assignment to creditworthy \nAffiliates and for collateral security purposes to facilitate project financing;56 (7) confidentiality \nobligations;57 (8) information access and audit rights;58 (9) responsibility for subcontractors;59 (10) \ninformal dispute resolution and optional arbitration, with any arbitration decision affecting \njurisdictional rates, terms, and conditions filed with the Commission;60 (11) customary \nrepresentations and warranties regarding good standing, authority, absence of conflict, and \nregulatory approvals;61 and (12) miscellaneous provisions addressing, among other things, \nseverability, binding effect, rules of interpretation, entire agreement, no third-party beneficiaries, \nwaiver, amendment, and the absence of any partnership among the Parties.62 \nAs proposed in DCRT’s LLIP, DCRT will evaluate the specific operating requirements for \nco-located load and generation to ensure reliability, including for BTMG.63  DCRT is aligned with \nthe CAISO on the requirement that all generation exporting to the CAISO-controlled grid must \nundergo the CAISO’s Generator Interconnection and Deliverability Allocation Procedures \n(“GIDAP”) process.64  DCRT’s LLIA accommodates co-located generation and BTMG through \nits Appendix H, as explained below.  DCRT’s LLIA can be revised to accommodate the CAISO \nas a party to the extent there is co-location and BTMG facilities that inject power to the CAISO-\ncontrolled grid and that injection of power must be coordinated with the relevant Large Load \nInterconnection Customers. \n \n55 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, Arts. 18.1-18.3; CAISO Tariff, App. EE, LGIA, \nat §§ 18.1-18.3. \n56 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, Art. 19; CAISO Tariff, App. EE, LGIA, at § \n19. \n57 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, Art. 22; CAISO Tariff, App. EE, LGIA, at § \n22. \n58 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, Art. 25; CAISO Tariff, App. EE, LGIA, at § \n25. \n59 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, Art. 26; CAISO Tariff, App. EE, LGIA, at § \n26. \n60 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, Art. 27; CAISO Tariff, App. EE, LGIA, at § \n27. \n61 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, Art. 28; CAISO Tariff, App. EE, LGIA, at § \n28. \n62 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, Arts. 20, 30; CAISO Tariff, App. EE, LGIA, at \n§§ 20, 30. \n63 BTMG, which is defined to be purely non-exporting generation, will be studied by DCRT during the LLIP.  See \nDCRT TO Tariff, proposed Appendix IV, LLIP and Timeline.  Specific provisions for BTMG are described in \nAppendix H to DCRT’s proposed LLIA.  See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, \nAppendix H, at §§ H.1, H.3, H.8; see also DCRT TO Tariff, proposed Appendix IV, at § 1.4(xi). \n64 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, at Art. 3.2."},{"page":14,"startToken":5909,"endToken":6391,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 14 \n \n \nC. \nDCRT’s Large Load Interconnection Process is Designed to Operate in Close \nCoordination with the CAISO, Including with Respect to Co-Located \nGeneration and BTMG \nDCRT emphasizes that the central focus of its proposed TO Tariff revisions is to establish \na just and reasonable, transparent, and clearly delineated process through which a Large Load \nInterconnection Customer may interconnect a Large Load to DCRT’s facilities, consistent with the \nrequirements of the OSC Order.  DCRT recognizes, however, that the interconnection of a Large \nLoad to its system does not occur in isolation.  Because DCRT’s facilities are under the operational \ncontrol of the CAISO, and because the CAISO remains responsible for the interconnection of \ngenerating facilities—including co-located generation—to the CAISO Controlled Grid, DCRT’s \nproposed LLIP have been designed to operate in close coordination with the CAISO to ensure the \nreliability of both DCRT’s facilities and the CAISO-controlled transmission system.65  \nAccordingly, upon Commission acceptance of DCRT’s LLIP, DCRT will coordinate and \ncollaborate with the CAISO regarding both the interconnection of Large Loads and, as explained \nbelow, the co-location of generation and BTMG with such Large Loads, as further memorialized \nin an Appendix H to the LLIA. To that end, DCRT’s proposed LLIA establishes several specific \nmechanisms through which DCRT will keep the CAISO informed throughout the load \ninterconnection process, as described below. \n1. \nInformation-Sharing with the CAISO \nDCRT will provide the CAISO with notice of any delays in DCRT’s construction of \nInterconnection Facilities, Network Upgrades, or Distribution Upgrades.66 This notice requirement \nis reasonable because the CAISO, as the entity responsible for the reliable operation of the CAISO-\ncontrolled transmission system and for transmission planning, must be aware of changes in the \nanticipated in-service dates of facilities that will be integrated into the transmission system over \nwhich the CAISO exercises operational control, so that the CAISO may account for such changes \nin its operational and planning activities. \nDCRT will provide the CAISO with the specifications for the Large Load Interconnection \nCustomer’s Interconnection Facilities and Large Load Facility, as well as “as-built” drawings, \ninformation, and documents for DCRT’s Interconnection Facilities, including appropriate \ndrawings and relay diagrams.67  Providing this information ensures that the CAISO has an accurate \nand complete understanding of the physical and protection characteristics of the facilities being \nconnected to the CAISO-controlled transmission system, which is essential to the CAISO’s ability \nto model the transmission system accurately and to maintain reliability. \nTo the extent applicable, DCRT will provide the CAISO with monthly construction status \nreports regarding the construction and installation of DCRT’s Interconnection Facilities and \n \n65 See OSC Order, at PP 26, 37, 86 n.189. \n66 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, at Art. 5.1.1. \n67 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, at Arts. 5.9.1-5.9.3, 5.10."},{"page":15,"startToken":6391,"endToken":6894,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 15 \n \n \nNetwork Upgrades.68  These reports will include, but are not limited to: (1) progress to date; (2) a \ndescription of the activities undertaken since the last report; (3) a description of the action items \nfor the next reporting period; and (4) the delivery status of equipment ordered.69 Regular, \nstructured reporting of this nature will afford the CAISO ongoing visibility into the status of the \nfacilities necessary to serve new Large Loads, consistent with the Commission’s expectation in \nthe OSC Order that the CAISO and the CAISO PTOs will coordinate with each other, as \nappropriate, to address the concerns the Commission identified.70 \n2. \nCoordination with Affected Systems \nIn addition to coordination with the CAISO, DCRT’s proposed LLIP and LLIA recognize \nthat the interconnection of a Large Load may affect systems other than DCRT’s own and, \ntherefore, includes requirements for coordination with, and the provision of certain information to, \nAffected Systems.71  Specifically, DCRT will conduct a Scoping Meeting with the Large Load \nInterconnection Customer, other Affected Systems, and, as applicable, the CAISO.72  The purpose \nof the Scoping Meeting is to discuss alternative interconnection options; to exchange information, \nincluding any transmission data and earlier study evaluations that would reasonably be expected \nto impact such interconnection options; and to analyze such information.73 Convening all relevant \nparties at the earliest stage of the LLIP will help to identify potential issues before significant study \nresources are expended, promote the efficient selection of Points of Interconnection, and reduce \nthe likelihood of later disputes regarding study assumptions—a concern the Commission \nspecifically identified in the OSC Order.74 \nFurther, under DCRT’s proposed LLIP, the Large Load Interconnection Customer will be \nobligated to enter into a construction and reimbursement agreement with the owner of any Affected \nSystem and/or other affected owners of portions of the CAISO Controlled Grid that govern \nfacilities built on the relevant Affected System.75  Those agreements will govern the construction \nof facilities on Affected Systems and address the payments to be made by the Large Load \nInterconnection Customer to the owner of the Affected System and/or other affected owners of \nportions of the CAISO Controlled Grid, as well as any repayment by such owners.76 \n \n68 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, at Art. 24.2. \n69 Id. \n70 See OSC Order, at P 37. \n71 See DCRT TO Tariff, proposed Appendix IV, LLIP, at § 4.4.  \n72 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, at Art. 1 (definition of “Scoping Meeting”); see \nalso DCRT TO Tariff, proposed Appendix IV, LLIP, at § 2.2. \n73 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, at Art. 1 (definition of “Scoping Meeting”). \n74 See OSC Order, at P 54. \n75 See DCRT TO Tariff, proposed Appendix IV, LLIP, at § 4.4. \n76 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, at Art. 11.3.3; OSC Order, at PP 65, 78."},{"page":16,"startToken":6894,"endToken":7418,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 16 \n \n \n3. \nTreatment of Co-Located Generation and BTMG \nDCRT’s proposed LLIA addresses the treatment of co-located generation and BTMG.  \nConsistent with the CAISO’s existing practice, and with DCRT’s understanding of the CAISO’s \nposition, described above, co-located generation will continue to interconnect through the \nCAISO’s GIDAP process pursuant to a Commission-approved Large Generator Interconnection \nAgreement.77 Facility-specific guidelines and procedures governing any net generation delivered \nto the grid from co-located generation will be addressed in Appendix H of the LLIA.78  \nDCRT’s proposal treats a Large Load that is co-located with generation, or that is served \nin part by BTMG, as a Large Load for purposes of the LLIP, while leaving the interconnection of \nthe associated generating facility to the CAISO, to the extent that the generation exports power to \nthe CAISO Controlled Grid.  A Large Load Interconnection Customer must disclose in its Large \nLoad Interconnection Application whether co-located generation is present and, if so, whether the \ngeneration resource will be fully behind-the-meter or may export to the CAISO Controlled Grid, \nthe resource type, nameplate capacity, minimum and maximum operating levels, market \nparticipation status, and associated resource identifiers, together with all information required by \nDCRT and, as applicable, the CAISO in the Large Generator Interconnection Application.79  \nDCRT’s Large Load Interconnection studies will then evaluate the specific operating requirements \nof the combined load and generation configuration, including BTMG, to ensure that the \ninterconnection can be accommodated reliably.80 Any generating facility that will export energy \nto the CAISO Controlled Grid, however, must interconnect through the CAISO’s GIDAP and \nexecute a Commission-accepted LGIA, consistent with the CAISO’s existing practice and with the \nCommission’s recognition that the CAISO Tariff governs the generator interconnection process.81  \nThis division of labor ensures that the Large Load interconnection and the generator \ninterconnection are each studied under the procedures designed for them, without duplicating the \nCAISO’s generator interconnection function or creating inconsistent study results.  \nTo ensure that the two processes operate in tandem, DCRT will coordinate with the CAISO \nat each stage of the DCRT LLIP: DCRT will provide to the CAISO a copy of the Large Load \nInterconnection Application, the CAISO may participate with DCRT in designing any FILI \nconstraints necessary to maintain reliability, and DCRT will coordinate with the CAISO on testing \nand commissioning of the Large Load and associated interconnection facilities.82  In addition, \nDCRT will coordinate with the CAISO to the extent the interconnection of a Large Load may \nimpact the reliability of the CAISO Controlled Grid, and any potential injection of power from a \nLarge Load, including from co-located generation, will require such coordination to ensure \n \n77 See OSC Order, at P 26. \n78 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, Appendix H, at §§ H.4, H.5. \n79 See DCRT TO Tariff, proposed Appendix IV, LLIP, at § 1.4(xi). \n80 See DCRT TO Tariff, proposed Appendix IV, LLIP, at § 2.2–2.4.  \n81 See OSC Order, at P 86 n.189. \n82 See DCRT TO Tariff, proposed Appendix IV, LLIP, at §§ 1.2, 2.2.2, 3.1, 4.3."},{"page":17,"startToken":7418,"endToken":7942,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 17 \n \n \ncompliance with the CAISO Tariff.83  The CAISO’s role further will be memorialized in the DCRT \nLLIA, to which the CAISO will be a party, as stated above, if there is an injection of power to the \nCAISO-controlled grid.  Finally, as noted above, the treatment of any net generation delivered to \nthe transmission system from co-located generation or BTMG will be addressed on a project-\nspecific basis in an appendix to the DCRT LLIA,84 ensuring that each such arrangement is subject \nto clear, enforceable terms that account for its particular operating characteristics.  \nDCRT’s proposed approach respects the existing allocation of responsibilities between the \nCAISO, which administers generator interconnection, and the CAISO PTOs, which administer \nload interconnection, while ensuring that the unique operational characteristics of each co-location \narrangement are captured on a project-specific basis. Indeed, the Commission expressly \nrecognized in the OSC Order that the CAISO PTOs’ role in conducting load studies may stem \nfrom how the CAISO and the CAISO PTOs allocated rights and responsibilities in the governing \ndocuments establishing the CAISO and stated that it does not seek to alter that allocation.85  \nD. \nDCRT’s Proposed Flexible Interim Load Interconnection Service \nAs discussed above, DCRT understands that the CAISO has declined to propose a new \ntransmission service at this time in light of the CAISO’s day-ahead scheduling process for \nallocating transmission capacity,86 and DCRT defers to the CAISO on this issue. As the \nCommission itself recognized in the OSC Order, the framework under which the CAISO provides \ntransmission service is unique among the RTOs/ISOs:  the CAISO does not offer traditional Order \nNo. 888 network and point-to-point transmission services, offers no firm, long-term transmission \nreservations of capacity, and instead offers a single “daily” transmission service that is available \nto all Eligible Customers on a day-to-day basis.87   \nRather than proposing a new transmission service, and as envisioned for CAISO PTO’s \nthrough the CAISO coordination process, DCRT is proposing a new FILI Service that will be \navailable when a Large Load’s full requested capacity cannot immediately be provided on a firm \nbasis.88  In alignment with DCRT’s understanding of the CAISO’s conception of the FILI Service, \nDCRT’s proposed revisions address: (1) the allocation of responsibility among the relevant parties; \n(2) information-sharing with the CAISO; (3) operational requirements, including curtailment \nmechanisms and data reporting; (4) cost-responsibility provisions; and (5) the transition to firm \n \n83 See DCRT TO Tariff, proposed Appendix IV, LLIP, at § 4.3. \n84 See OSC Order, at P 51; DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, at Appendix H. \n85 See OSC Order, at PP 51, 86 n.189. \n86 See CAISO Draft Final Proposal, Large Load Enhancements, September 24, 2026 at 67, available at \nhttps://stakeholdercenter.caiso.com/InitiativeDocuments/Draft-Final-Proposal-Large-Load-Enhancements-Sep-24-\n26.pdf (“The CAISO does not propose to create new ‘transmission services’ or more responsibilities around eligible \ncustomers, which would require redesigning transmission and interconnection service entirely. The CAISO does not \nbelieve such a redesign is warranted.”). \n87 See OSC Order, at PP 19, 104. \n88 See DCRT TO Tariff, proposed Appendix IV, LLIP, at § 3."},{"page":18,"startToken":7942,"endToken":8423,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 18 \n \n \nservice upon completion of the necessary Network Upgrades.  Each of these elements is discussed \nfurther below. \n1. \nDCRT’s Proposed FILI Service Responds to the Commission’s \nDirectives Regarding Flexible Large Loads \nIn the OSC Order, the Commission preliminarily found that the CAISO Tariff appears to \nbe unjust and unreasonable because it does not include transmission services that reflect Eligible \nCustomers taking transmission service on behalf of flexible Large Loads that are willing and able \nto limit their use of the transmission system under certain conditions.89  The Commission directed \nthe CAISO to explain whether its Tariff remains just and reasonable without: (1) an interim non-\nfirm network transmission service while Network Upgrades are being constructed; and (2) \npermanent firm and non-firm contract demand transmission services.90  In the alternative, the \nCommission provided that the CAISO may explain whether, given that the CAISO does not offer \nthe transmission services required by Order No. 888, its existing transmission service framework \naddresses the Commission’s concerns, or explain what specific changes to that framework would \neffectively provide comparable transmission service options for flexible Large Loads as in the \nPJM Interconnection, LLC  Co-Location Order.91  The Commission further noted that it has found \nit just and reasonable that, in order to take such interim or contract demand transmission services, \nan Eligible Customer must have necessary control technologies and/or protection systems, which \nmay include a special protection scheme, to limit its energy withdrawals to its approved level.92  \nIn reaching these preliminary findings, the Commission recognized that load flexibility can avoid \ninefficient and costly transmission system build-out and can help timely interconnect flexible \nLarge Loads.93  Although these particular directives were addressed to the CAISO, DCRT’s \nproposed FILI Service provides a mechanism for Large Load interconnection to DCRT’s system \nthat is consistent with the interim, flexible service the Commission contemplated. \n2. \nTerms and Conditions of FILI Service \nUnder Section 3.1 of DCRT’s proposed LLIP, DCRT may offer FILI Service if the System \nImpact Study shows that the Large Load “cannot be reliably served at its full requested demand \nuntil certain Network Upgrades are completed.”94  In that instance, the Large Load Interconnection \nCustomer may request that DCRT offer FILI Service, and DCRT “may propose a customized plan \n. . . based on the type of constraints required to maintain Transmission System reliability.”95 The \nLarge Load Interconnection Customer “may participate in the design of the FILI Service \n \n89 See OSC Order, at P 104. \n90 See OSC Order, at P 105. \n91 See OSC Order, at PP 104-05 (citing PJM Interconnection, LLC, 193 FERC ¶ 61,217, PP 201, 205). \n92 See OSC Order, at PP 102, 105. \n93 See OSC Order, at P 104. \n94 See DCRT TO Tariff, proposed Appendix IV, LLIP, at § 3.1. \n95 See DCRT TO Tariff, proposed Appendix IV, LLIP, at § 3.1."},{"page":19,"startToken":8423,"endToken":8897,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 19 \n \n \nconstraints.”96  Once the necessary upgrades are complete, the Large Load Interconnection \nCustomer “may elect to receive firm service.”97  This provision serves as the operative trigger for \nFILI Service and provides the pathway for transition to firm service that the OSC Order \ncontemplates.98  By allowing the specific constraints of FILI Service to be tailored, with the \nparticipation of the Large Load Interconnection Customer, to the reliability needs identified in the \nSystem Impact Study, this approach ensures that FILI Service reasonably limits a Large Load’s \nuse of the system only to the extent necessary to maintain reliability on DCRT’s single-line system \nand the CAISO Controlled Grid.  \nUnder Section A-2 of Appendix A to the LLIA, a Large Load Interconnection Customer \nmay elect to take FILI Service until the Network Upgrades identified in Appendix A have achieved \nCommercial Operation.99  This structure tracks the Commission’s description of an interim service \navailable “while network upgrades are being constructed.”100  As with the interim service the \nCommission described, DCRT’s proposed FILI Service will allow a flexible Large Load to obtain \ninterconnection service more quickly than it otherwise could, in exchange for its willingness to \naccept limitations on its use of the system until the necessary upgrades are complete.101  \nSection A-2 of Appendix A to the LLIA, items 2(a)–(g), detail what should be included in \na project-specific FILI addendum to a LLIA that implements the following concepts, in furtherance \nof the Commission’s directives: (i) study methods revised “to recognize the unique operational \ncharacteristics of flexible large loads”; (ii) “curtailment implementation mechanisms and data \nreporting”; (iii) financial security “during the conditional service period”; (iv) “automatic \nconversion to firm service upon Network Upgrade completion”; (v) coordination with the study \nprocess; and (vi) provisions governing longer-duration curtailments “in coordination with, as \napplicable, the CAISO.”102  \nMemorializing these terms in an addendum to the LLIA will ensure that the terms and \nconditions of FILI Service are transparent, are applied on a consistent and non-discriminatory basis \nto all similarly situated customers, and are enforceable.103  The curtailment implementation \nmechanisms, in particular, serve the same function as the control technologies and/or protection \nsystems that the Commission has found necessary to limit an Eligible Customer’s energy \nwithdrawals to its approved level.104  \n \n96 See DCRT TO Tariff, proposed Appendix IV, LLIP, at § 3.1. \n97 Id. \n98 See OSC Order, at PP 105, 110. \n99 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, Appendix A at § A-2. \n100 See OSC Order, at P 105. \n101 See OSC Order, at P 104 n.227. \n102 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, Appendix A at § A-2, items 2(a)-2(g). \n103 See OSC Order, at P 64. \n104 See OSC Order, at P 105."},{"page":20,"startToken":8897,"endToken":9325,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 20 \n \n \nE. \nCost Responsibility for Network Upgrades \nDCRT understands the concerns about fair and equitable cost responsibility for Large \nLoads and has proposed a mechanism that DCRT believes balances its obligations under the FPA \nand the OSC Order, given that DCRT is a single-asset Transco and does not have a traditional \nintegrated transmission system. Specifically, with respect to cost responsibility, Article 11.3.1 of \nthe LLIA provides that Large Load Facilities will be reimbursed for Reimbursable Network \nUpgrades costing more than $10 million if the Large Load Facility reaches commercial \noperation.105 DCRT has provided a mechanism pursuant to which DCRT can seek a return of any \namounts paid to the Large Load Interconnection Customer, to the extent that DCRT is not able to \nrecover amounts paid for Reimbursable Network Upgrades in its transmission revenue \nrequirement. The claw back period is five (5) years.   \nDCRT has proposed this mechanism because of concerns that Network Upgrades required \nfor the interconnection of Large Load Facilities may be of a similar scope and size as those required \nunder the CAISO generator interconnection process and it may be unduly discriminatory for \nDCRT to maintain different reimbursement procedures for the similar Network Upgrades, \nparticularly for a single-asset Transco where the upgrades may be at or near each other.  \nReimbursement of Network Upgrades was a debated issue in the CAISO stakeholder process and \nDCRT understands that its reimbursement policies may be subject to additional discussion as part \nof the CAISO stakeholder process.  \nF. \nCAISO Data Exchange \nThe Commission directed the CAISO and the PTOs to jointly address provision of data on \nthe CAISO’s website in a single location, and in an easily accessible format that is searchable and \nallows users to filter the data, on transmission service provided to Eligible Customers on behalf of \nLarge Loads, for Network Upgrades evaluated in the local transmission planning process that are \nneeded to accommodate transmission service to Eligible Customers on behalf of those Large \nLoads, and the costs for those Network Upgrades.106  DCRT will coordinate with the CAISO and \nprovide all data requested by the CAISO to support the CAISO’s provision of this information in \nthe manner directed by the OSC.107   \n \n105 See DCRT TO Tariff, proposed Appendix IV, Attachment 3, LLIA, at Art. 11.3.1. \n106 See OSC Order, at P 66. \n107 DCRT will coordinate with CAISO concerning CAISO’s and DCRT’s data exchange and posting obligations and \nwill incorporate the details of this process in DCRT’s Large Load interconnection business practices."},{"page":21,"startToken":9325,"endToken":9598,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 21 \n \n \nIII. \nCORRESPONDENCE \nDCRT respectfully request that the following individuals be included on the official service \nlist in this proceeding and for receipt of any communications regarding this filing:108  \nAli Amirali \nJason Crew \nDCR Transmission, L.L.C. \nc/o Lotus Infrastructure, LLC \n5 Greenwich Office Park - 2nd floor \nGreenwich, CT 06831 \naamirali@lotuspartners.com \njcrew@lotuspartners.com \nJoseph C. Hall  \nAnthony Danti \nShenghao Wang \nKelly A. Cuthbertson \nEversheds Sutherland (US), LLP \n700 Sixth Street NW, Suite 700 \nWashington, DC 20001 \nTel: (202) 383-0915 \njoehall@eversheds-sutherland.com \nanthonydanti@eversheds-sutherland.com \nshenghaowang@eversheds-sutherland.com \nkellycuthbertson@eversheds-sutherland.com \n \nIV. \nREQUESTED EFFECTIVE DATE \nDCRT respectfully requests that the Commission accept the proposed DCRT TO Tariff \nrevisions submitted herewith to be effective on February 15, 2027.  \nV. \nDOCUMENTS ENCLOSED \nThis filing consists of the following: \n• \nA revised version of the DCRT TO Tariff, main body; \n• \nA new Appendix IV, Large Load Interconnection Process and Timeline, to the \nDCRT TO Tariff, and the following attachments thereto: \no Attachment 1, Large Load System Impact Study Agreement; \no Attachment 2, Large Load Facilities Study Agreement; \no Attachment 3, Large Load Interconnection Agreement;  \no Attachment 4, Interconnection Financial Security;  \n• \nA redline reflecting all revisions to the main body of the DCRT TO Tariff and the \nnew Appendix IV, including all new attachments. \n \n108 DCRT respectfully requests that the Commission grant waiver of Rule 2010(k)(1) of the Commission’s Rules of \nPractice and Procedure to permit DCRT to include more than two representatives on the official service list in this \nproceeding.  See 18 C.F.R. § 385.2010(k)(1)."},{"page":22,"startToken":9598,"endToken":9699,"text":"The Honorable Debbie Anne A. Reese \nNovember 16, 2026 \nPage 22 \n \n \nVI. \nSERVICE \nA copy of this filing has been served upon the CAISO. \nVII. \nCONCLUSION \nBased on the foregoing, DCRT respectfully requests that the Commission accept and \napprove the revisions to its TO Tariff to be effective on February 15, 2027. \nRespectfully submitted, \n/s/ Joseph C. Hall \n \nJoseph C. Hall  \nAnthony Danti \nShenghao Wang \nKelly A. Cuthbertson \nEversheds Sutherland (US), LLP  \n700 Sixth Street, NW, Suite 700 \nWashington, D.C. 20001  \njoehall@eversheds-sutherland.com  \nanthonydanti@eversheds-sutherland.com \nshenghaowang@eversheds-sutherland.com \nkellycuthbertson@eversheds-sutherland.com \nCounsel for DCR Transmission, L.L.C."},{"page":23,"startToken":9699,"endToken":9704,"text":"REVISED DCRT TO TARIFF (CLEAN)"},{"page":24,"startToken":9704,"endToken":9712,"text":"DCR Transmission, L.L.C. \nTransmission Owner Tariff"},{"page":25,"startToken":9712,"endToken":9720,"text":"DCR TRANSMISSION, L.L.C. \nTRANSMISSION OWNER TARIFF"},{"page":26,"startToken":9720,"endToken":9974,"text":"TABLE OF CONTENTS \n \nPage No. \n1. \nPreamble .............................................................................................................................4 \n2. \nEffective Date .....................................................................................................................4 \n3. \nTO Definitions ....................................................................................................................4 \n3.1. \nAccess Charge.........................................................................................................4 \n3.2. \nAlternative Transmission Technologies ...............................................................4 \n3.3. \nBase Transmission Revenue Requirement (“Base TRR”) .................................4 \n3.4. \nCAISO ADR Procedures .......................................................................................4 \n3.5. \nCAISO Controlled Grid ........................................................................................4 \n3.6. \nCAISO Tariff ..........................................................................................................4 \n3.7. \nCompleted Application Date .................................................................................5 \n3.8. \nCompleted Interconnection Application ..............................................................5 \n3.9. \nDirect Assignment Facilities..................................................................................5 \n3.10. DCR Transmission, L.L.C. (“DCRT”).................................................................5 \n3.11. Existing Contracts ..................................................................................................5 \n3.12. Expedited Interconnection Agreement ................................................................5 \n3.13. Flexible Interim Load Interconnection Service (“FILI Service”) .....................5 \n3.14. Interconnection Application .................................................................................5 \n3.15. Large Load .............................................................................................................5 \n3.16. Large Load Facilities Study ..................................................................................6 \n3.17. Large Load Facilities Study Agreement ..............................................................6 \n3.18. Large Load Interconnection Agreement .............................................................6 \n3.19. Large Load Interconnection Application ............................................................6 \n3.20. Large Load Interconnection Customer ...............................................................6 \n3.21. Large Load Interconnection Facilities .................................................................6 \n3.22. Large Load Interconnection Process (“LLIP”) ..................................................6 \n3.23. Large Load Interconnection Service ....................................................................6 \n3.24 \nLarge Load System Impact Study ........................................................................6 \n3.25. Large Load System Impact Study Agreement ....................................................7 \n3.26. Net FTR Revenue ...................................................................................................7 \n3.27. Participation Agreement .......................................................................................7 \n3.28. Project Proponent ..................................................................................................7 \n3.29. Regional Transmission Group (“RTG”) ..............................................................7 \n3.30. Regulatory Authority.............................................................................................7 \n3.31. Reliability Upgrade ................................................................................................7 \n3.32. Requests for Expedited Interconnection Procedures .........................................8 \n3.33. System Impact Study .............................................................................................8 \n3.34. System Impact Study Agreement .........................................................................8 \n3.35. TO Tariff.................................................................................................................8 \n3.36. Transmission Revenue Balancing Account Adjustment (“TRBAA”) ..............8"},{"page":27,"startToken":9974,"endToken":10275,"text":"3.37. Participating TO’s Transmission System ............................................................8 \n4. \nEligibility .............................................................................................................................8 \n5. \nAccess Charges ...................................................................................................................8 \n5.1. \nTransmission Revenue Requirement (“TRR”) ...................................................8 \n5.2. \nTransmission Revenue Balancing Account Adjustment (“TRBAA”) ..............8 \n6. \nAncillary Services--Applicability and Charges ...............................................................9 \n7. \nBilling and Payment ...........................................................................................................9 \n7.1. \nPayment ..................................................................................................................9 \n7.2. \nBilling ......................................................................................................................9 \n8. \nObligation to Interconnect or Construct Transmission Expansions and Facility \nUpgrades .............................................................................................................................9 \n8.1. \nParticipating TO Obligation to Interconnect ......................................................9 \n8.1.1. Interconnection to Transmission System ...............................................10 \n8.1.1.1. \nLetter Agreement ..............................................................10 \n8.1.2. Costs Associated with Interconnection ..................................................11 \n8.1.3. Interconnection Agreement.....................................................................12 \n8.1.4. Due Diligence to Construct .....................................................................13 \n8.1.5. Energization..............................................................................................13 \n8.1.6. Coordination with the CAISO on Interconnection Requests ..............13 \n8.2. \nParticipating TO Obligation to Construct Transmission Expansions or \nFacility Upgrades .................................................................................................13 \n8.2.1. Obligation to Construct ...........................................................................13 \n8.3. \nRequest for FERC Deference Regarding Need Determination .......................14 \n9. \nExpansion Process ............................................................................................................14 \n9.1. \nDetermination of Facilities ..................................................................................14 \n9.1.1. Payment of Facilities Study Costs ..........................................................14 \n9.1.1.1. \nMarket Participant to Pay for Facilities Study...............14 \n9.1.1.2. \nProject Sponsor or Project Proponent to Pay for \nFacilities Study ...................................................................14 \n9.1.1.3. \nPrincipal Beneficiaries to Pay for Facilities Study .........14 \n9.1.2. Payment Procedure ..................................................................................15 \n9.1.3. Facilities Study Procedures .....................................................................15 \n9.2. \nObligation to Build ...............................................................................................15 \n9.2.1. Due Diligence to Construct .....................................................................15 \n9.2.2. Delay in Construction or Expansion ......................................................16 \n9.2.2.1. \nAlternatives to the Original Facility Additions ..............16 \n9.2.2.2. \nRefund Obligation for Unfinished Facility Additions ....16 \n9.3. \nProvisions Relating To Transmission Construction on the Systems of Other \nTOs ........................................................................................................................16 \n9.3.1. Responsibility for Third Party Additions ..............................................16 \n9.3.2. Coordination of Third-Party System Additions....................................17"},{"page":28,"startToken":10275,"endToken":10524,"text":"10. \nInterconnection Process...................................................................................................17 \n10.1. Applicability .........................................................................................................17 \n10.2. Applications ..........................................................................................................17 \n10.3. Interconnection Application ...............................................................................17 \n10.3.1. Amendment to Completed Interconnection Application .....................18 \n10.4. Review of Completed Interconnection Application ..........................................19 \n10.5. Notice of Need for System Impact Study ...........................................................19 \n10.6. System Impact Study Cost Reimbursement and Agreement ...........................20 \n10.6.1. Cost Reimbursement ...............................................................................20 \n10.6.2. Multiple Parties ........................................................................................20 \n10.7. System Impact Study Procedures .......................................................................20 \n10.7.1. Procedures Upon Completion of System Impact Study .......................21 \n10.8. Notice of Need for Facilities Study .....................................................................21 \n10.9. Facilities Study Procedures .................................................................................22 \n10.9.1. Execution of Interconnection Agreement ..............................................22 \n10.10. Partial Interim Service ........................................................................................23 \n10.11. Expedited Procedures for New Facilities ...........................................................23 \n11. \nUncontrollable Forces and Indemnification ..................................................................23 \n11.1. Procedures to Follow if Uncontrollable Force Occurs .....................................23 \n11.2. Indemnification ....................................................................................................24 \n12. \nRegulatory Filings ............................................................................................................24 \n13. \nMiscellaneous....................................................................................................................24 \n13.1. Notices ...................................................................................................................24 \n13.2. Waiver ...................................................................................................................24 \n13.3. Confidentiality ......................................................................................................25 \n13.3.1. Maintaining Confidentiality if Not for Public Disclosure ....................25 \n13.3.2. Disclosure of Confidential Information .................................................25 \n13.4. Titles ......................................................................................................................25 \n13.5. Severability ...........................................................................................................25 \n13.6. Preservation of Obligations .................................................................................26 \n13.7. Governing Law .....................................................................................................26 \n13.8. Appendices Incorporated ....................................................................................26 \n13.9. Consistency with CAISO Tariff ..........................................................................26 \n13.10. Disputes .................................................................................................................26 \n4. \nEligibility .............................................................................................................................7 \n5. \nAccess Charges ...................................................................................................................7 \n5.1. \nTransmission Revenue Requirement (“TRR”) ...................................................7 \n5.2. \nTransmission Revenue Balancing Account Adjustment (“TRBAA”) ..............7 \n6. \nAncillary Services--Applicability and Charges ...............................................................7 \n7. \nBilling and Payment ...........................................................................................................7"},{"page":29,"startToken":10524,"endToken":10849,"text":"7.1. \nPayment ..................................................................................................................7 \n7.2. \nBilling ......................................................................................................................8 \n8. \nObligation to Interconnect or Construct Transmission Expansions and Facility \nUpgrades .............................................................................................................................8 \n8.1. \nParticipating TO Obligation to Interconnect ......................................................8 \n8.1.1. Interconnection to Transmission System .................................................8 \n8.1.2. Costs Associated with Interconnection ..................................................10 \n8.1.3. Interconnection Agreement.....................................................................10 \n8.1.4. Due Diligence to Construct .....................................................................11 \n8.1.5. Energization..............................................................................................11 \n8.1.6. Coordination with the CAISO on Interconnection Requests ..............12 \n8.2. \nParticipating TO Obligation to Construct Transmission Expansions or \nFacility Upgrades .................................................................................................12 \n8.2.1. Obligation to Construct ...........................................................................12 \n8.3. \nRequest for FERC Deference Regarding Need Determination .......................12 \n9. \nExpansion Process ............................................................................................................12 \n9.1. \nDetermination of Facilities ..................................................................................12 \n9.1.1. Payment of Facilities Study Costs ..........................................................12 \n9.1.1.1. \nMarket Participant to Pay for Facilities Study...............12 \n9.1.1.2. \nProject Sponsor or Project Proponent to Pay for \nFacilities Study ...................................................................12 \n9.1.1.3. \nPrincipal Beneficiaries to Pay for Facilities Study .........13 \n9.1.2. Payment Procedure ..................................................................................13 \n9.1.3. Facilities Study Procedures .....................................................................13 \n9.2. \nObligation to Build ...............................................................................................14 \n9.2.1. Due Diligence to Construct .....................................................................14 \n9.2.2. Delay in Construction or Expansion ......................................................15 \n9.2.2.1. \nAlternatives to the Original Facility Additions ..............15 \n9.2.2.2. \nRefund Obligation for Unfinished Facility Additions ....15 \n9.3. \nProvisions Relating To Transmission Construction on the Systems of Other \nTOs ........................................................................................................................16 \n9.3.1. Responsibility for Third Party Additions ..............................................16 \n9.3.2. Coordination of Third-Party System Additions....................................16 \n10. \nInterconnection Process...................................................................................................16 \n10.1. Applicability .........................................................................................................16 \n10.2. Applications ..........................................................................................................17 \n10.3. Interconnection Application ...............................................................................17 \n10.3.1. Amendment to Completed Interconnection Application .....................18 \n10.4. Review of Completed Interconnection Application ..........................................18 \n10.5. Notice of Need for System Impact Study ...........................................................19 \n10.6. System Impact Study Cost Reimbursement and Agreement ...........................19 \n10.6.1. Cost Reimbursement ...............................................................................20 \n10.6.2. Multiple Parties ........................................................................................20 \n10.7. System Impact Study Procedures .......................................................................20"},{"page":30,"startToken":10849,"endToken":11014,"text":"10.7.1. Procedures Upon Completion of System Impact Study .......................20 \n10.8. Notice of Need for Facilities Study .....................................................................21 \n10.9. Facilities Study Procedures .................................................................................22 \n10.9.1. Execution of Interconnection Agreement ..............................................22 \n10.10. Partial Interim Service ........................................................................................22 \n10.11. Expedited Procedures for New Facilities ...........................................................22 \n11. \nUncontrollable Forces and Indemnification ..................................................................23 \n11.1. Procedures to Follow if Uncontrollable Force Occurs .....................................23 \n11.2. Indemnification ....................................................................................................23 \n12. \nRegulatory Filings ............................................................................................................23 \n13. \nMiscellaneous....................................................................................................................23 \n13.1. Notices ...................................................................................................................24 \n13.2. Waiver ...................................................................................................................24 \n13.3. Confidentiality ......................................................................................................24 \n13.3.1. Maintaining Confidentiality if Not for Public Disclosure ....................24 \n13.3.2. Disclosure of Confidential Information .................................................24 \n13.4. Titles ......................................................................................................................25 \n13.5. Severability ...........................................................................................................25 \n13.6. Preservation of Obligations .................................................................................25 \n13.7. Governing Law .....................................................................................................25 \n13.8. Appendices Incorporated ....................................................................................25 \n13.9. Consistency with CAISO Tariff ..........................................................................25 \n13.10. Disputes .................................................................................................................25 \n \n \n \nAPPENDIX I TRANSMISSION REVENUE REQUIREMENT AND TRBAA \n \nAPPENDIX II NOTICE \n \nAPPENDIX III PRO FORMA LETTER AGREEMENT \n \nAPPENDIX IV – LARGE LOAD INTERCONNECTION PROCESS AND TIMELINE"},{"page":31,"startToken":11014,"endToken":11437,"text":"1. \nPreamble.  DCR Transmission, L.L.C.’s (“DCRT” or “Participating TO”) Transmission \nRevenue Requirement (“TRR”) for its Regional Transmission Facilities placed under the \nCalifornia Independent System Operator Corporation’s (“CAISO”) Operational Control, \nand certain terms and conditions relating to transmission expansion of and \ninterconnection with DCRT’s Regional Transmission Facilities placed under the CAISO’s \nOperational Control, are set forth in this Transmission Owner (“TO”) Tariff. \n2. \nEffective Date.  This TO Tariff is effective on the date on which DCRT became a \nParticipating TO, and shall continue to be effective so long as DCRT is a party to the \nTransmission Control Agreement (“TCA”). \n3. \nTO Definitions.  Certain capitalized terms used in this TO Tariff that are set out \nimmediately below shall have the meanings set out below unless otherwise stated or the \ncontext otherwise requires. Capitalized terms used in this TO Tariff and not defined \nbelow shall have the meanings set out in the CAISO Open Access Transmission Tariff \n(“Tariff”), as it may be amended from time to time. \n3.1. \nAccess Charge.  A charge paid by all Utility Distribution Companies, Small \nUtility Distribution Companies, and Metered Sub System (“MSS”) Operators with \nGross Load in a Participating Transmission Owner (“PTO” or “Participating TO”) \nService Territory, as set forth in CAISO Tariff, Article II.  The Access Charge \nincludes the Regional Access Charge and the Local Access Charge, as applicable.  \nThe Access Charge will recover the Participating TO’s TRR in accordance with \nCAISO Tariff, Appendix F, Schedule 3.   \n3.2  \nAlternative Transmission Technologies.  Any transmission technology other \nthan Network Upgrades that can be used to improve the Participating TO’s \nTransmission System facilitate the interconnection of a Customer or a Large Load \nInterconnection Customer, which may include but is not limited to, static \nsynchronous compensators, static VAR compensators, advanced power flow \ncontrol devices, transmission switching, synchronous condensers, voltage source \nconverters, advanced conductors, unified power flow controller, and tower lifting. \n3.3. \nBase Transmission Revenue Requirement (“Base TRR”).  The TRR before \nreflecting TRBAA and Standby Transmission Revenues. The Base TRR is shown \nin Appendix I to this TO Tariff. \n3.4.  \nCAISO ADR Procedures.  The procedures for resolution of disputes or \ndifferences set out in Section 13 of the CAISO Tariff, as amended from time to \ntime. \n3.5. \nCAISO-Controlled Grid.  The system of transmission lines and associated \nfacilities of the Participating TOs that have been placed under the CAISO’s \nOperational Control. \n \n3.6. \nCAISO Tariff.  The currently effective CAISO Agreement and Tariff, as it is on \nfile with FERC and as may be modified from time to time."},{"page":32,"startToken":11437,"endToken":11825,"text":"3.7. \nCompleted Application Date.  The date on which a party submits an \nInterconnection Application that satisfies the requirements of a Completed \nInterconnection Application. \n3.8. \nCompleted Interconnection Application.  An Interconnection Application that \nsatisfies all of the information and other requirements of Section 10.3 of this TO \nTariff and, if applicable, the information requirements as specified by the CAISO \nand posted on the CAISO Home Page. \n3.9. \nDirect Assignment Facilities.  Facilities or portions of facilities that are owned \nby the Participating TO necessary to physically and electrically interconnect a \nparticular party requesting interconnection under this TO Tariff to the CAISO \nControlled Grid at the point of interconnection.  Direct Assignment Facilities \nshall be specified in the Interconnection Agreement that governs Interconnection \nservice to such party and shall be subject to FERC approval. \n3.10. DCR Transmission, L.L.C. (“DCRT”).  The Delaware limited liability \ncorporation that is the Participating TO under this TO Tariff. \n3.11. Existing Contracts.  Those transmission service agreements or other contracts \nwhich grant transmission service rights in existence on the CAISO Operations \nDate (including any contracts entered into pursuant to such contracts) as may be \namended in accordance with their terms or by agreement between the parties \nthereto from time to time. \n3.12. Expedited Interconnection Agreement.  A contract between a party which has \nsubmitted a Request for Expedited Interconnection Procedures and the \nParticipating TO under which the Participating TO agrees to process, on an \nexpedited basis, the Completed Interconnection Application of such party and \nwhich sets forth the terms, conditions, and cost responsibilities for such \nInterconnection. \n \n3.13  Flexible Interim Load Interconnection Service (“FILI Service”). An \ninterconnection service that may be offered by Participating TO at its sole \ndiscretion, that interconnects a Large Load Facility that cannot be reliably served \nat its full requested capacity without the construction of Network Upgrades or \nAlternative Transmission Technologies, subject to operational constraints on the \nLarge Load Facility to ensure Transmission System reliability, as memorialized in \na Large Load Interconnection Agreement.  \n3.14. Interconnection Application.  An application that requests Interconnection to \nthe CAISO Controlled Grid, other than a Large Load Interconnection Application.  \n3.15  Large Load.  An End User located at a single site whose Point(s) of \nInterconnection is/are to the CAISO-Controlled Grid, and that has a peak load of \n50 MW or greater."},{"page":33,"startToken":11825,"endToken":12225,"text":"3.16.  Large Load Facilities Study.  The second study conducted as part of the LLIP \nas described in Appendix IV to this TO Tariff, used to create the detailed design \nof the interconnection facilities used to interconnect the Large Load to the \nParticipating TO’s facilities, based on the findings of the Large Load System \nImpact Study. \n3.17.  Large Load Facilities Study Agreement.  The prerequisite agreement before \nDCRT will conduct, or cause to be conducted, the Large Load Interconnection \nFacilities Study, a pro forma version of which constitutes Attachment 2 to \nAppendix IV of this TO Tariff. \n3.18.  Large Load Interconnection Agreement.  The required agreement between \nDCRT and a Large Load Interconnection Customer prior to construction of Large \nLoad Interconnection Facilities, a pro forma version of which constitutes \nAttachment 3 of Appendix IV of this TO Tariff. \n3.19.  Large Load Interconnection Application.  The required application for a Large \nLoad Interconnection Customer seeking interconnection with DCRT’s \nTransmission System, as described in Appendix IV to this TO Tariff.  \n3.20. Large Load Interconnection Customer.  Any entity that proposes to \ninterconnect a Large Load, or modify its existing interconnection, with the DCRT \nTransmission System.   \n3.21. Large Load Interconnection Facilities.  All facilities and equipment between \nthe Large Load and the Point of Interconnection, including any modification, \nadditions or upgrades that are necessary to physically and electrically interconnect \nthe Large Load to the transmission system. Interconnection Facilities are sole-use \nfacilities and shall not include Distribution Upgrades, Stand Alone Network \nUpgrades or Network Upgrades.  \n3.22. Large Load Interconnection Process (“LLIP”).  The process by which Large \nLoads may be interconnected to DCRT’s Transmission System, as described in \nAppendix IV to this TO Tariff.  \n3.23.  Large Load Interconnection Service.  The service provided by the Participating \nTO associated with interconnecting the Large Load Interconnection Customer’s \nGenerating Facility to the CAISO-Controlled Grid and enabling it to receive \nelectric energy and capacity from the CAISO-Controlled Grid at the Point of \nInterconnection, pursuant to the terms of the Large Load Interconnection \nAgreement, the Participating TO’s TO Tariff, and the CAISO Tariff.  \n3.24.  Large Load System Impact Study.  The initial study conducted as part of the \nLLIP as described in Appendix IV to this TO Tariff, consisting of short circuit \nanalysis, a stability analysis, a power flow analysis, and any other studies that are \ndeemed necessary. \n3.25  Large Load System Impact Study Agreement.  The prerequisite agreement"},{"page":34,"startToken":12225,"endToken":12705,"text":"before DCRT will conduct, or cause to be conducted, the Large Load System \nImpact Study, a pro forma version of which constitutes Attachment 1 to Appendix \nIV of this TO Tariff. \n3.26. Net FTR Revenue.  The sum of: 1) The revenue received by the Participating \nTO from the sale, auction, or other transfer of the Financial Transmission Rights \n(“FTR”) provided to it pursuant to Section 9.4.3 FTR, or any substantively \nidentical successor provision, of the CAISO Tariff; and 2) For each hour: a) the \nUsage Charge revenue received by the Participating TO associated with its \nSection 9.4.3 FTRs; minus b) Usage Charges that are: i) incurred by the \nScheduling Coordinator for the Participating TO under CAISO Tariff Section \n7.3.1.4, ii) associated with the Participating TO’s Section 9.4.3 FTRs, and iii) \nincurred by the Participating TO for its energy transactions but not incurred as a \nresult of the use of the transmission by a third-party and minus c) the charges paid \nby the Participating TO pursuant to Section 7.3.1.7, to the extent such charges are \nincurred by the Scheduling Coordinator of the Participating TO on Congested \nInter-zonal Interfaces that are associated with the Section 9.4.3 FTRs provided to \nthe Participating TO. The component of Net FTR Revenue represented by item 2) \nimmediately above shall not be less than zero for any hour. \n3.27. Participation Agreement.  An agreement between a Participating TO and a \nProject Sponsor that specifies the terms and conditions under which the \nParticipating TO will construct a transmission addition or upgrade on behalf of \nthe Project Sponsor. \n3.28. Project Proponent.  A Market Participant or group of Market Participants that: \n(i) advocates a transmission addition or upgrade; (ii) is unwilling to pay the full \ncost of the proposed transmission addition and upgrade and thus is not a Project \nSponsor; and (iii) initiates proceedings under the CAISO ADR Procedures to \ndetermine the need for the proposed transmission addition or upgrade. \n3.29. Regional Transmission Group (“RTG”).  A voluntary organization approved \nby FERC and composed of transmission owners, transmission users, and other \nentities, organized to efficiently coordinate the planning, expansion, and use of \ntransmission on a regional and inter-regional basis. \n3.30. Regulatory Authority.  The Federal Energy Regulatory Commission (“FERC”), \nor successor agency. \n3.31. Reliability Upgrade.  The transmission facilities other than Direct Assignment \nFacilities beyond the first point of Interconnection necessary to interconnect a \nNew Facility or wholesale Load safely and reliably to the CAISO Controlled \nGrid, which would not have been necessary but for the Interconnection of a New \nFacility or wholesale Load, including network upgrades necessary to remedy \nshort circuit or stability problems resulting from the Interconnection of the new \nFacility or wholesale Load to the CAISO Controlled Grid. Reliability Upgrades \nalso include, consistent with WECC practice, the facilities necessary to mitigate"},{"page":35,"startToken":12705,"endToken":13092,"text":"any adverse impact a New Facility’s or wholesale Load’s Interconnection may \nhave on a path’s WECC path rating. Reliability Upgrades shall be specified in the \nInterconnection Agreement that governs Interconnection service and shall be \nsubject to FERC approval. \n3.32. Requests for Expedited Interconnection Procedures.  A written request by \nwhich an applicant for Interconnection can request expedited processing of its \nInterconnection Application. \n3.33. System Impact Study.  An engineering study conducted by a Participating TO to \ndetermine whether a request for Interconnection to the Participating TO’s \ntransmission system would require new transmission additions, upgrades or other \nmitigating measures. \n3.34. System Impact Study Agreement.  An agreement between a Participating TO \nand an entity that has requested Interconnection to the Participating TO’s \ntransmission system pursuant to which the entity requesting Interconnection \nagrees to reimburse the Participating TO for the cost of performing or reviewing a \nSystem Impact Study. \n3.35. TO Tariff.  This Transmission Owner Tariff, as it may be amended or \nsuperseded. \n3.36. Transmission Revenue Balancing Account Adjustment (“TRBAA”).  A \nmechanism established by the Participating TO which will ensure that all \nTransmission Revenue Credits and other credits specified in Sections 6 and 8 of \nCAISO Tariff, Appendix F, Schedule 3 flow through to CAISO Tariff and TO \nTariff transmission customers. \n3.37.  Participating TO’s Transmission System.  The transmission facilities owned \nby DCRT.  \n4. \nEligibility.  Transmission service over DCRT’s Regional Transmission Facilities and \nEntitlements placed under the CAISO’s Operational Control shall be provided only to \nEligible Customers as defined by the CAISO Tariff. Any dispute as to whether a customer \nis eligible for wholesale transmission service shall be resolved by FERC. \n5. \nAccess Charges.  The applicable Access Charges are provided in the CAISO Tariff. \n5.1. \nTransmission Revenue Requirement (“TRR”).  As set forth in the CAISO \nTariff, the TRR for each Participating TO is used to develop the Access Charges \nset forth in the CAISO Tariff, and is used by the CAISO to calculate the \ndisbursement of wheeling revenues among Participating TOs pursuant to Section \n26.1.4.3 of the CAISO Tariff.  DCRT’s TRR is set forth in Appendix I. \n5.2. \nTRBAA.  The Participating TO shall maintain a Transmission Revenue \nBalancing Account (“TRBA”) that will ensure that all Transmission Revenue \nCredits and the refunds, specified in Sections 6 and 8 of Appendix F, Schedule 3"},{"page":36,"startToken":13092,"endToken":13434,"text":"of the CAISO Tariff, flow through to transmission customers. The TRBAA shall \nbe equal to: TRBAA = TRCF + TRCT + I. \nTRCT = \nThe balance representing the prior period difference \nbetween the projected Transmission Revenue Credits \nand the actual credits. \n \nTRCF = \nThe forecast of Transmission Revenue Credits for \nthe following calendar year. \n \n  I \n= \nThe interest balance for the TRBA, which shall be \ncalculated using the interest rate pursuant to Section \n35.19(a) of FERC’s regulations under the Federal Power \nAct (18 CFR Section 35.19(a)). Interest shall be calculated \nbased on the average TRBA principal balance each month, \ncompounded quarterly. \n \nThe DCRT estimated TRBAA, calculated in accordance with the CAISO \nTariff, is stated in Appendix I. \n6. \nAncillary Services--Applicability and Charges.  If any Ancillary Services are required, \nDCRT will not provide such services, but transmission customers will be required to \nmeet any such requirement in accordance with the CAISO Tariff. \n7. \nBilling and Payment. \n7.1. \nPayment.  The CAISO, in accordance with the CAISO Tariff, shall pay the \nParticipating TO, among other things, Wheeling, Usage, Access Charge revenues, \nand FTR auction proceeds (excluding Usage Charge revenues payable to FTR \nHolders) in accordance with the CAISO Tariff. \n7.2. \nBilling.  Users of DCRT’s Regional Transmission Facilities and Entitlements \nplaced under the CAISO’s Operational Control shall pay to the CAISO all \napplicable charges in accordance with the CAISO Tariff. \n8. \nObligation to Interconnect or Construct Transmission Expansions and Facility \nUpgrades. \n8.1. \nParticipating TO Obligation to Interconnect.  The Participating TO shall, at \nthe request of a third party pursuant to Section 10, interconnect its system to the \nwholesale generation or load of such third party, or modify an existing wholesale \nInterconnection. Interconnections under this TO Tariff shall be available to \nentities eligible to request Interconnection consistent with the provisions of \nSection 210(a) of the FPA.  Interconnections requested by entities or individuals \nthat are not so eligible shall be governed by the Local Regulatory Authority. The \nprocedures for Interconnection of wholesale generation to the CAISO Controlled \nGrid shall be governed by the CAISO Tariff."},{"page":37,"startToken":13434,"endToken":13903,"text":"8.1.1. Interconnection to Transmission System.  Interconnection must be \nconsistent with Good Utility Practice, in conformance with all Applicable \nReliability Criteria, all applicable statutes, regulations, and CAISO \nreliability criteria for the CAISO Controlled Grid. The Participating TO \nwill not accommodate the Interconnection if doing so would impair \nsystems reliability or would otherwise impair the ability of the \nParticipating TO to honor its Encumbrances existing as of the time an \nentity submits its Interconnection Application. The Participating TO shall \nidentify any such adverse effect on its Encumbrances in the System \nImpact Study performed pursuant to Section 10.7. To the extent the \nParticipating TO determines that the Interconnection will have an adverse \neffect on Encumbrances, the party requesting Interconnection shall \nmitigate such adverse effect. \n8.1.1.1  Letter Agreement.  Pursuant to Section 12 of Appendix DD of \nthe ISO Tariff, prior to executing an Interconnection Agreement, a party \nseeking Interconnection may, in order to advance the implementation of \nits Interconnection, request, and the Participating TO shall offer the party, \na Letter Agreement, a pro forma version of which is set forth in Appendix \nIII to the TO Tariff, that authorizes the Participating TO to begin \nengineering, design, and procurement of long lead-time items, or \nconstruction necessary for the establishment of the Interconnection.  \nHowever, Participating TO shall not be obligated to offer a Letter \nAgreement if the party seeking Interconnection is in Dispute Resolution as \na result of an allegation that the party seeking Interconnection has failed to \nmeet any milestones or comply with any prerequisites specified in the ISO \nTariff.  The Letter Agreement is an optional procedure.  The Letter \nAgreement shall provide for the party seeking Interconnection to pay the \ncost of all activities authorized by the party and to make advance \npayments or provide other satisfactory security for such costs. \nFollowing a party seeking Interconnection’s request for a Letter \nAgreement, the Participating TO shall prepare and tender to the party \nseeking Interconnection a draft Letter Agreement in the form of the \nParticipating TO’s FERC-approved Letter Agreement as set forth in \nAppendix III to the TO Tariff, including draft exhibits that include the \nproposed scope of work, estimated costs, payments, financial security and \nmilestones, as applicable. The party seeking Interconnection shall provide \nwritten comments, or notification of no comments, to the draft exhibits \nwithin thirty (30) Calendar Days. The Participating TO and the party \nseeking Interconnection shall negotiate concerning any disputed \nprovisions of the exhibits to the draft Letter Agreement for not more than \nninety (90) Calendar Days after the Participating TO tenders the draft \nLetter Agreement to the party seeking Interconnection.  If the party \nseeking Interconnection determines that negotiations are at an impasse, it \nmay request termination of the negotiations at any time after tender of the \ndraft Letter Agreement and request submission of the unexecuted Letter"},{"page":38,"startToken":13903,"endToken":14354,"text":"Agreement with FERC or initiate dispute resolution procedures pursuant \nto Section 13.10 of this TO Tariff. If the party seeking Interconnection \nrequests termination of the negotiations, but within ninety (90) Calendar \nDays after the Participating TO tenders the draft Letter Agreement to the \nparty seeking Interconnection, fails to request either the filing of the \nunexecuted Letter Agreement or initiate dispute resolution procedures, it \nshall be deemed to have withdrawn its request for a Letter Agreement and \nthe Participating TO shall have no further obligation to enter into a Letter \nAgreement, unless an extension is mutually agreed to by the parties.  The \nParticipating TO shall provide to the party seeking Interconnection a final \nLetter Agreement within fifteen (15) Business Days after the completion \nof the negotiation process. \nFollowing submission of the final Letter Agreement to the party seeking \nInterconnection, the party shall either: (i) execute two originals of the \ntendered Letter Agreement and return them to the Participating TO; or (ii) \nrequest in writing that the Participating TO file with FERC a Letter \nAgreement in unexecuted form. As soon as practicable, but not later than \nten (10) Business Days after receiving either the two executed originals of \nthe tendered Letter Agreement (if it does not conform with a FERC-\napproved Letter Agreement) or the request to file an unexecuted Letter \nAgreement, the Participating TO shall file the Letter Agreement with \nFERC, together with its explanation of any matters as to which the party \nseeking Interconnection and the Participating TO disagree and support for \nthe costs that the Participating TO proposes to charge to the party seeking \nInterconnection under the Letter Agreement. An unexecuted Letter \nAgreement should contain terms and conditions deemed appropriate by \nthe Participating TO for the Interconnection request.  \nIf the party seeking Interconnection executes the final Letter Agreement, \nthe Participating TO and the party seeking Interconnection shall perform \ntheir respective obligations in accordance with the terms of the Letter \nAgreement, subject to modification by FERC.  Upon submission of an \nunexecuted Letter Agreement, the party seeking Interconnection and the \nParticipating TO shall promptly comply with the unexecuted Letter \nAgreement, subject to modification by FERC. \n8.1.2. Costs Associated with Interconnection.  Each party requesting \nInterconnection shall pay the costs of planning, installing, owning, \noperating, and maintaining any Direct Assignment Facilities and, if \napplicable, any Reliability Upgrades required to provide the requested \nInterconnection. In addition, such party shall implement all existing \noperating procedures necessary to safely and reliability interconnect such \nparty’s generation or wholesale load to the facilities of the Participating \nTO and to ensure the CAISO Controlled Grid’s conformance with the \nCAISO Grid Planning Criteria, and shall bear all costs of implementing \nsuch operating procedures. Any additional costs associated with"},{"page":39,"startToken":14354,"endToken":14811,"text":"accommodating the Interconnection shall be allocated in accordance with \nthe cost responsibility methodology set forth in the CAISO Tariff for \ntransmission expansions or upgrades. \n8.1.3. Interconnection Agreement.  Pursuant to Section 10.4, 10.7.1, or \n10.9.1, a party requesting an Interconnection shall request in writing that \nthe Participating TO tender to such part an Interconnection Agreement that \nwill be filed with FERC, or the Local Regulatory Authority, in the case of \na Local Publicly Owned Electric Utility. The Interconnection Agreement \nwill include, without limitation, cost responsibilities and payment \nprovisions for any engineering, equipment, and construction, ownership, \noperation and maintenance costs for any Direct Assignment Facilities, any \nReliability Upgrades, any Delivery Upgrades, if applicable, and for any \nother mitigation measures. For an Interconnection request to remain a \nCompleted Interconnection Application, the party requesting the \nInterconnection shall execute the Interconnection Agreement and return it \nto the Participating TO within thirty (30) Business Days of receipt.  \nAlternatively, if an Eligible Customer requesting the Interconnection \nrequests the Participating TO to file an unexecuted Interconnection \nAgreement and commits to abide by the terms, conditions, and cost \nassignments determined to be just and reasonable under the CAISO ADR \nProcedures, including any determination by FERC or on appeal of a FERC \ndetermination in accordance with that process, the Participating TO shall \npromptly file an unexecuted Interconnection Agreement. Provided, \nhowever, that if the CAISO ADR Procedures concerns whether the \nrequesting entity is an Eligible Customer, the Participating TO shall not be \nobligated to file an unexecuted interconnection Agreement or commence \nconstruction of the Interconnection facilities or incur other costs under the \nInterconnection Agreement until a final order determining the just and \nreasonable rates, terms, and conditions for such Interconnection \nAgreement has been issued by the applicable court or regulatory authority. \nThe Interconnection Agreement will set forth a payment schedule that \nenables the Participating TO to recover its costs. If the applicant elects not \nto execute the Interconnection Agreement and does not request the \nParticipating TO to file an unexecuted Interconnection Agreement, its \nCompleted Interconnection Agreement shall be deemed withdrawn, and \nthe applicant shall reimburse to the Participating TO all costs reasonably \nincurred in processing the application not covered by any System Impact \nStudy Agreement or Facilities Study Agreement. To maintain its queue \nposition, the applicant must timely comply with the Interconnection \nrequirements of Section 5.76 of the CAISO Tariff and Sections 8.1 and 10 \nof this TO Tariff. If the applicant fails to timely comply with such \nInterconnection requirements, such applicant shall pay the reasonable \ncosts of revising the System Impact Studies for other applicants that have \nestablished a new queue position due to the applicant either withdrawing \nits Interconnection Application or because its queue position has been"},{"page":40,"startToken":14811,"endToken":15251,"text":"modified pursuant to the queuing provisions in Section 25 of the CAISO \nTariff. \n8.1.4. Due Diligence to Construct.  The Participating TO shall use due \ndiligence to construct, within a reasonable time, any Direct Assignment \nFacilities and any Reliability Upgrades that it is obligated to construct \npursuant to this TO Tariff and Section 24 of the CAISO Tariff. The \nParticipating TO’s obligation to build will be subject to: (1) its ability, \nafter making a good faith effort, to obtain any necessary approvals and \nproperty rights under applicable federal, state, and local laws; (2) the \npresence of a cost recovery mechanism with cost responsibility assigned to \naccordance with the CAISO Tariff or applicable FERC precedent; and (3) \na signed Interconnection Agreement or a signed Expedited Interconnection \nAgreement, or, by mutual agreement of the parties, FERC acceptance for \nfiling of an unexecuted Interconnection Agreement. \n8.1.5. Energization.  The Participating TO shall not be obligated to energize, \nnor shall the applicant or wholesale load be entitled to have its \ninterconnection to the CAISO-Controlled Grid energized, unless and until \nan Interconnection Agreement has been executed, or filed at FERC \npursuant to Section 8.1.3; or a Large Load Interconnection Agreement has \nbeen executed, or filed at FERC pursuant to Appendix IV, Section 2.5.1; \nand such agreement become effective and such applicant or wholesale \nload has demonstrated to the CAISO’s reasonable satisfaction that it has \ncomplied with all of the requirements of the CAISO Tariff and the \nrequirements of this TO Tariff. \n8.1.6. Coordination with CAISO on Interconnection Requests.  The \nParticipating TO shall coordinate with the CAISO and Affected TOs, if \nany, pursuant to the provisions of the TCA, in developing interconnection \nstandards and guidelines for processing interconnection request under this \nTO Tariff. \n8.2. \nParticipating TO Obligation to Construct Transmission Expansions or \nFacility Upgrades.  The Participating TO shall be obligated to: (1) perform \nSystem Impact or Facility Studies where the Project Sponsor or the CAISO agrees \nto pay the study cost and specifies the project objectives to be achieved, and (2) \nbuild transmission additions and facility upgrades where the Participating TO is \nobligated to construct or expand facilities in accordance with and subject to the \nlimitations under Section 24 of the CAISO Tariff and this TO Tariff. \n8.2.1. Obligation to Construct.  Participating TO shall not be obligated to \nconstruct or expand transmission facilities or system upgrades unless and \nuntil the conditions stated in Section 9.2.1 hereof have been satisfied. \n8.3. \nRequest for FERC Deference Regarding Need Determination.  It is intended \nthat FERC grant substantial deference to the factual determinations of the CAISO,"},{"page":41,"startToken":15251,"endToken":15646,"text":"(including the CAISO’s ADR Procedures), the CPUC, WECC, or RTG \ncoordinated planning processes as to the need for or construction of a facility, the \nneed for full cost recovery, and the allocation of costs. \n9. \nExpansion Process. \n9.1. \nDetermination of Facilities.  A Participating TO shall perform a Facilities Study \nin accordance with this Section where (1) the Participating TO is obligated to \nconstruct or expand facilities in accordance with Section 24 of the CAISO Tariff \nand this TO Tariff; (2) a Market Participant agrees to pay the costs of the \nFacilities Study and specifies the project objectives to be achieved in terms of \nincreased capacity or reduced congestion; or (3) the Participating TO is required \nto perform a Facilities Study pursuant to the CAISO Tariff. \n9.1.1. Payment of Facilities Study Costs. \n9.1.1.1. Market Participant to Pay for Facilities Study.  Where a \nMarket Participant requests a Facilities Study and the need for \nthe transmission addition or upgrade has not yet been \nestablished in accordance with the procedures established \nherein and the CAISO Tariff, the Market Participant shall pay \nthe cost of the Facilities Study. \n9.1.1.2. Project Sponsor or Project Proponent to Pay for Facilities \nStudy.  Where the facilities to be added or upgraded have \nbeen determined to be needed in accordance with the \nprocedures established herein and the CAISO Tariff, the \nProject Sponsor, Project Proponent, or the CAISO requesting \nthe study shall pay the reasonable cost of the Facilities Study. \nWhen the Participating TO is the Project Sponsor in \naccordance with the CAISO Tariff, the costs of the Facilities \nStudy shall be recovered through its Access Charges and \ntransmission rates. \n9.1.1.3. Principal Beneficiaries to Pay for Facilities Study.  Where \nthe facilities to be added or upgraded have been determined to \nbe needed and the principal beneficiaries have been identified \nby the CAISO or CAISO ADR Procedures in accordance with \nthe CAISO Tariff, the Project Sponsor and the identified \nprincipal beneficiaries shall pay the reasonable cost of the \nFacilities Study, in such proportions as may be agreed, or, \nfailing agreement, as determined in accordance with the \nCAISO ADR Procedures. \n9.1.2. Payment Procedure.  Where a Facilities Study is being conducted \npursuant to this TO Tariff, the Participating TO shall, within thirty (30) \ndays of the receipt of all reasonably required information, tender to the"},{"page":42,"startToken":15646,"endToken":16121,"text":"Market Participant, Project Sponsor, Project Proponent, CAISO, or \nidentified principal beneficiaries, as the case may be, a Facilities Study \nAgreement that defines the scope, content, assumptions, and terms of \nreference for such study, the estimated time required to complete it, and \nsuch other provisions as the parties may reasonably require and pursuant \nto which such Market Participant, Project Sponsor, Project Proponent, the \nCAISO, or identified principal beneficiaries agree to reimburse the \nParticipating TO the reasonable cost of performing the required Facilities \nStudy. If the Market Participant, Project Sponsor, Project Proponent, the \nCAISO, or identified principal beneficiaries, as the case may be, agree to \nthe terms of the Facilities Study Agreement, they shall execute the \nFacilities Study Agreement and return it to the Participating TO within ten \n(10) Business Days.  Alternatively, if the Market Participant, Project \nSponsor, Project Proponent, the CAISO, or identified principal \nbeneficiaries, as the case may be, request the Participating TO to proceed \nwith the Facilities Study and commit to abide by the terms, conditions, and \ncost assignments ultimately determined under the CAISO ADR \nProcedures, including any determination by FERC or appeal of a FERC \ndetermination in accordance with that process, the Participating TO shall \npromptly proceed with the Facilities Study, and the parties shall submit the \ndisputed terms for resolution under the CAISO’s ADR Procedures.   \n9.1.3. Facilities Study Procedures.  Upon receipt of an executed Facilities \nStudy Agreement or alternative request to proceed as provided for in \nSection 9.1.2, a copy of which has been provided to the CAISO by the \nparty requesting the Facilities Study, the Participating TO will use due \ndiligence to complete the required Facilities Study within a sixty (60) day \nperiod.  If the Participating TO is unable to complete the Facilities Study \nin the allotted time period, the Participating TO shall notify the party \nrequesting the Facilities Study and provide an estimate of the time needed \nto reach a final determination along with an explanation of the reasons that \nadditional time is required to complete the Facilities Study.  If additional \ntime is required, the Participating TO will use best efforts to complete the \nFacilities Study within ten (10) months, provided adequate information is \nprovided by all the parties. \n9.2. \nObligation to Build. \n9.2.1. Due Diligence to Construct.  Subject to Section 9.3.3 of this TO Tariff, \nthe Participating TO shall use due diligence to construct, within a \nreasonable time, additions or upgrades to its transmission system that it is \nobligated to construct pursuant to the CAISO Tariff and this TO Tariff.  \nAlternatively, if a Market Participant requests the Participating TO to file \nan unexecuted Participation Agreement and commits to abide by the \nterms, conditions, and cost assignments determined to be just and \nreasonable under the CAISO ADR Procedures, including any \ndetermination by FERC or on appeal of a FERC determination in"},{"page":43,"startToken":16121,"endToken":16590,"text":"accordance with that process, the Participating TO shall promptly file an \nunexecuted Participation Agreement. Provided, however, that if the \nCAISO ADR Procedures concerns whether the requesting entity is an \nEligible Customer, the Participating TO shall not be obligated to file an \nunexecuted Participation Agreement or alternatively, if a Market \nParticipant requests the Participating TO to file an unexecuted \nParticipation Agreement and commits to abide by the terms, conditions, \nand cost assignments determined to be just and reasonable under the \nCAISO ADR Procedures, including any determination by FERC or on \nappeal of a FERC determination in accordance with that process, the \nParticipating TO shall promptly file an unexecuted Participation \nAgreement. Provided, however, that if the CAISO ADR Procedures \nconcerns whether the requesting entity is an Eligible Customer, the \nParticipating TO shall not be obligated to file an unexecuted Participation \nAgreement, commence construction of the additions or upgrades or incur \nother costs under the Participation Agreement until a final order \ndetermining the just and reasonable rates, terms, and conditions for such \nParticipation Agreement has been issued by the applicable court or \nregulatory authority.   The Participating TO’s obligation to build will be \nsubject to: 1) its ability, after making a good faith effort, to obtain the \nnecessary approvals and property rights under applicable federal, state, \nand local laws; 2) the presence of a cost recovery mechanism with cost \nresponsibility assigned in accordance with the CAISO Tariff; and 3) a \nsigned Participation Agreement. The Participating TO will not construct or \nexpand its existing or planned transmission system if doing so would \nimpair system reliability as determined through systems analysis based on \nthe Applicable Reliability Criteria. \n9.2.2. Delay in Construction or Expansion.  If any event occurs that will \nmaterially affect the time for completion of new facilities, or the ability to \ncomplete them, the Participating TO shall promptly notify: (1) the Project \nSponsor with regard to facilities determined to be needed; (2) the Parties \nto the Participation Agreement with regard to facilities determined to be \nneeded pursuant to the CAISO Tariff where principal beneficiaries were \nidentified; and (3) the CAISO.  In such circumstances, the Participating \nTO shall, within thirty (30) days of notifying such Project Sponsor, Parties \nto the Participation Agreement, and the CAISO of such delays, convene a \ntechnical meeting with such Project Sponsor, Parties to the Participation \nAgreement, and the CAISO to discuss the circumstances which have \narisen and evaluate any options available. The Participating TO also shall \nmake available to such Project Sponsor, Parties to the Participation \nAgreement, and the CAISO, as the case may be, studies and work papers \nrelated to the cause and extent of the delay and the Participating TO’s \nability to complete the new facilities, including all information that is in \nthe possession of the Participating TO that is reasonably needed to \nevaluate the alternatives."},{"page":44,"startToken":16590,"endToken":16999,"text":"9.2.2.1. Alternatives to the Original Facility Additions.  If the \nreview process of Section 9.2.2 determines that one or more \nalternatives exist to the originally planned construction \nproject, the Participating TO shall present such alternatives for \nconsideration to the Project Sponsor, Parties to the \nParticipation Agreement, and the CAISO, as the case may be. \nIf upon review of any alternatives, such Project Sponsor, the \nCAISO, or Parties to the Participation Agreement wish to \nevaluate or to proceed with one of the alternative additions or \nupgrades, such Project Sponsor, the CAISO, or Parties to the \nParticipation Agreement may request that the Participating TO \nprepare a revised Facility Study pursuant to Sections 9.1.1, \n9.1.2, and 9.1.3 of this TO Tariff. In the event the \nParticipating TO concludes that no reasonable alternative \nexists to the originally planned addition or upgrade and the \nProject Sponsor or Parties to the Participation Agreement or \nthe CAISO disagree, the dispute shall be resolved pursuant to \nthe CAISO ADR Procedure \n9.2.2.2. Refund Obligation for Unfinished Facility Additions.  If \nthe Participating TO and the Project Sponsor, the CAISO, or \nParties to the Participation Agreement, as the case may be, \nmutually agree that no other reasonable alternatives exist, the \nobligation to construct the requested additions or upgrades \nshall terminate and any deposit not yet applied toward the \nexpended project costs shall be returned with interest pursuant \nto FERC Regulation 35.19(a)(2)(iii).  However, the Project \nSponsor and any identified principal beneficiaries, as the case \nmay be, shall be responsible for all costs prudently incurred \nby the Participating TO through the time the construction was \nsuspended. \n9.3. \nProvisions Relating To Transmission Construction on the Systems of Other \nTOs. \n9.3.1. Responsibility for Third Party Additions.  Participating TO shall not be \nresponsible for making arrangements for any engineering, permitting, and \nconstruction of any transmission or distribution facilities on the system(s) \nof any other entity or for obtaining any regulatory approval for such \nfacilities. The Participating TO will undertake reasonable efforts through \nthe coordinated planning process to assist in making such arrangements, \nincluding, without limitation, providing any information or data required \nby such other electric system pursuant to Good Utility Practice. \n9.3.2. Coordination of Third-Party System Additions.  Where transmission \nadditions or upgrades being built pursuant to the CAISO Tariff require \nadditions or upgrades on other systems, to the extent consistent with this"},{"page":45,"startToken":16999,"endToken":17376,"text":"TO Tariff, the Participating TO shall coordinate construction on its own \nsystem with the construction required by others. The Participating TO, \nafter consultation with the CAISO, the Project Sponsor, and Parties to the \nParticipation Agreement, as the case may be, may defer construction if the \nnew transmission facilities on another system cannot be completed in a \ntimely manner. The Participating TO shall notify such Project Sponsor, \nParties to the Participation Agreement, and the CAISO, in writing of the \nbasis for any decision to defer construction and the specific problems \nwhich must be resolved before it will initiate or resume construction of the \nnew facilities. Within forty (40) Business Days of receiving written \nnotification by the Participating TO of its intent to defer construction \npursuant to this section, such Project Sponsor, Parties to the Participation \nAgreement, or the CAISO may challenge the decision in accordance with \nthe CAISO ADR Procedure. \n10. \nInterconnection Process. \n10.1. Applicability.  All requests for Interconnection directly to the CAISO Controlled \nGrid from parties eligible to request such Interconnection consistent with Section \n210(a) of the FPA shall be processed pursuant to the provisions of this Section 10, \nexcept for requests for Interconnection from Large Loads.  Large Load requests \nfor Interconnection shall be processed pursuant to Appendix IV to this Tariff.  \nAll requests for Interconnection of wholesale generation directly to the CAISO \nControlled Grid shall be processed pursuant to the provisions of the CAISO \nTariff. \n10.2. Applications.  Except as provided in Section 10.1, a party requesting \nInterconnection shall submit written Interconnection Application which provides \nthe information required in Section 10.3 to the Participating TO and shall send a \ncopy of the application to the CAISO. The Participating TO shall time-stamp the \napplication to establish study priority. \n10.3. Interconnection Application.  An Interconnection Application shall provide all \nof the information listed in 18 C.F.R. § 2.20, including, but not limited to, the \nfollowing: \n(i) \nThe identity, address, telephone number, and facsimile number of the entity \nrequesting Interconnection; \n(ii) \nThe Interconnection point(s) to the CAISO Controlled Grid contemplated by \nthe applicant; \n(iii) \nThe resultant (or new) maximum amount of Interconnection capacity \ncontemplated by the applicant; \n(iv) \nThe proposed date for energizing the Interconnection and the term of \nInterconnection service; and"},{"page":46,"startToken":17376,"endToken":17806,"text":"(v) \nSuch other information as the Participating TO reasonably requires to \nprocess the application. \n \nIn addition to the information specified above, the following information may also \nbe provided in order to properly evaluate system conditions: \n \n(vi) \nIf the applicant is a Load, the electrical location of the source of the power \n(if known) to be transmitted pursuant to the applicant’s request for \nInterconnection. If the source of the power is not known, a system purchase \nwill be assumed.; \n(vii) \nThe electrical location of the ultimate load (if known). If the location of the \nload is not known, a system sale will be assumed.; \n(viii) If an applicant proposes to perform or cause a third party to perform any \nrequired System Impact Study or any required Facilities Study, it shall so \nindicate in its Interconnection Application.  The results of any study or \nstudies performed by an applicant or its designated third party must be \napproved by both the CAISO and the Participating TO. \n \nWithin ten (10) Business Days after receipt of an Interconnection Application, the \nParticipating TO and the CAISO, if applicable, shall determine whether the \napplication is complete (“Completed Interconnection Agreement”). Whenever \npossible, the Participating TO will attempt to remedy deficiencies in the \nInterconnection Application through informal communications with the applicant. \nIf such efforts are unsuccessful, the Participating TO shall return the \nInterconnection Application to the applicant. The Participating TO will treat the \ninformation in the Interconnection Agreement, including the applicant’s identity, \nas confidential at the request of the applicant except to the extent that disclosure of \nthe information is required by this TO Tariff, by regulatory or judicial order, for \nreliability purposes pursuant to Good Utility Practice, or pursuant to RTG or \nCAISO transmission information sharing agreements. The Participating TO shall \ntreat this information consistent with the standards of conduct contained in Part 37 \nof FERC’s regulations. \n10.3.1. Amendment to Completed Interconnection Application.  An \napplicant shall only be limited to amending its Completed \nInterconnection Application once.  Additional amendments will be at \nthe Participating TO’s discretion, to be permitted on a not unduly \ndiscriminatory basis and without undue preference or advantage, and the \nParticipating TO’s agreement for applicant to make additional \namendment shall not be unreasonably withheld.  Such amendment shall \noccur on or before ten (10) Business Days following the date the \nParticipating TO tenders any Facilities Study Agreement. Specifically, \nan applicant may submit an amendment to its Completed \nInterconnection Application to reflect a revised configuration for its \nNew Facility. The amended Completed Interconnection Application \nshall be treated in accordance with Section 25 of the CAISO Tariff and"},{"page":47,"startToken":17806,"endToken":18300,"text":"Section 10.5 of this TO Tariff; the applicant’s Completed \nInterconnection Application shall be deemed withdrawn; and the \napplicant shall maintain its existing queue position, if (a) the amended \nCompleted Interconnection Application is received by the Participating \nTO within ten (10) Business Days of the Participating TO’s tender of a \nFacilities Study Agreement; and (b) the applicant has not submitted a \nprevious amendment to the Completed Interconnection Application. In \nthe event an applicant amends its Completed Interconnection \nApplication, it will be responsible for any additional study costs that \nresult from that amendment, including costs associated with revisions to \nstudies for other applicants holding later queue positions. \n10.4. Review of Completed Interconnection Application.  After receiving a \nCompleted Interconnection Application, the Participating TO and the CAISO, if \napplicable, will determine on a non-discriminatory basis whether a System Impact \nStudy is required. Whenever the Participating TO, and the CAISO, if applicable, \ndetermines that a System Impact Study is not required and that neither Reliability \nUpgrades nor changes in existing operating procedures are required, the \nParticipating TO shall notify the applicant within fifteen (15) Business Days of \nthe Completed Application Date. If the Interconnection can be accommodated \nwithout any Direct Assignment Facilities, then within thirty (30) Business Days of \nsuch notice from the Participating TO, the applicant shall request the Participating \nTO to tender to the applicant an Interconnection Agreement within thirty (30) \nBusiness Days of such request. The Participating TO shall tender to the applicant \nan Interconnection Agreement as provided in Section 8.1.3. If the Participating \nTO determines upon review of the Completed Interconnection Application, that \nDirect Assignment Facilities are required, the Participating TO shall tender to the \napplicant a Facilities Study Agreement within twenty (20) Business Days of the \nCompleted Application Date and continue the Interconnection process pursuant to \nSection 10.8 \n10.5. Notice of Need for System Impact Study.  If the Participating TO, and the \nCAISO if applicable, determines that a System Impact Study is necessary to \naccommodate the requested Interconnection, the Participating TO shall so inform \nthe applicant as soon as practicable. In such cases, the Participating TO shall \nwithin twenty (20) Business Days of receipt of a Completed Application, tender a \nSystem Impact Study Agreement that defines the scope, content, assumptions and \nterms of reference for such study to be completed by the Participating TO, the \nestimated time required to complete it, and such other provisions as the parties \nmay reasonably require, and pursuant to which the applicant shall agree to \nreimburse the Participating TO for the reasonable actual costs of performing the \nrequired System Impact Study.  A description of the Participating TO’s \ntransmission assessment practices for completing a System Impact Study shall be \nprovided in the Participating TO’s FERC Form 715.  Alternatively, if the \napplicant will perform the System Impact Study, the Participating TO shall within \ntwenty (20) Business Days of receipt of a Completed Interconnection Application, \ntender a System Impact Study Agreement that defines the scope, content,"},{"page":48,"startToken":18300,"endToken":18782,"text":"assumptions and terms of reference for such study to be reviewed by the \nParticipating TO; the estimated time required to complete it; and such other \nprovisions as the parties may reasonably require, and pursuant to which the \napplicant shall agree to reimburse the Participating TO for the reasonable actual \ncosts of reviewing the required System Impact Study.  For an Interconnection \nrequest to remain a Completed Interconnection Application, the applicant shall \nexecute the System Impact Study Agreement and return it to the Participating TO \nwithin ten (10) Business Days together with payment for the reasonable estimated \ncost of performing the System Impact Study or reviewing the applicant’s System \nImpact Study.  Alternatively, if the applicant request the Participating TO to \nproceed with the System Impact Study or review thereof and commits to abide by \nthe terms, conditions, and cost assignments ultimately determined under the \nCAISO ADR Procedures, including any determination by FERC or appeal of a \nFERC determination in accordance with that process, the Participating TO shall \npromptly proceed with the System Impact Study provided that such request is \naccompanied by payment of the reasonable estimated cost of the System Impact \nStudy, and the parties shall submit the disputed terms for resolution under the \nCAISO’s ADR Procedures.  If the applicant elects not to execute a System \nImpact Study Agreement, and does not request that the Participating TO proceed \nwith the System Impact Study or review thereof, its application shall be deemed \nwithdrawn, and the applicant shall reimburse to the Participating TO and the \nCAISO all costs reasonably incurred in processing the application. \n10.6. System Impact Study Cost Reimbursement and Agreement. \n10.6.1. Cost Reimbursement.  The System Impact Study Agreement shall \nclearly specify the charge for the System Impact Study, based on the \nParticipating TO’s estimate of the cost and time for completion of the \nSystem Impact Study. The charge shall not exceed the reasonable cost of \nthe study. In performing the System Impact Study, the Participating TO \nshall rely, to the extent reasonably practicable, on existing transmission \nplanning studies. The applicant will not be assessed a charge for such \nexisting studies; however, the applicant will be responsible for the \nreasonable charges associated with any modifications to existing \nplanning studies that are reasonably necessary to evaluate the impact of \nthe applicant’s request. \n10.6.2. Multiple Parties.  If multiple parties request Interconnection at the \nsame location, the Participating TO may conduct a single System Impact \nStudy. The costs of that study shall be pro-rated among the parties \nrequesting Interconnection. \n10.7. System Impact Study Procedures.  Upon receipt of an executed System Impact \nStudy Agreement or initiation of the CAISO ADR Procedures and receipt of \npayment for estimated study costs, the Participating TO will use due diligence to \n(a) complete the required System Impact Study within a sixty (60) calendar day \nperiod or (b) complete its review of an applicant’s System Impact Study within"},{"page":49,"startToken":18782,"endToken":19299,"text":"thirty (30) calendar days of its receipt of the completed study. The System Impact \nStudy will identify whether any Direct Assignment Facilities or Reliability \nUpgrades are necessary to deliver a New Facility’s full output over the CAISO \nControlled Grid, or any transmission additions or upgrades are necessary to serve \na wholesale load. The System Impact Study will also identify any adverse impact \non Encumbrances existing as of the applicant’s Completed Application Date.  In \nthe event that the Participating TO is unable to complete the required System \nImpact Study within such time period, it shall so notify the applicant, in writing, \nand provide an estimated completion date along with an explanation of the \nreasons why additional time is required to complete the required studies. A copy \nof the completed System Impact Study and related work papers shall be made \navailable to the applicant and the CAISO.  The Participating TO shall notify the \napplicant and the CAISO immediately upon completion of the System Impact \nStudy. \n10.7.1. Procedures Upon Completion of System Impact Study.  Within \nfifteen (15) Business Days of completion of the System Impact Study or \nreview and approval of an applicant’s System Impact Study, the \nParticipating TO shall notify the applicant whether the transmission \nsystem will be adequate to accommodate all of a request for \nInterconnection. If no costs are likely to be incurred for any Direct \nAssignment Facilities, any Reliability Upgrades, or implementing any \noperating procedures, then within thirty (30) Business Days of receipt of \nwritten approval of the applicant’s System Impact Study from the \nParticipating TO and the CAISO the applicant shall request the \nParticipating TO to tender an Interconnection Agreement within thirty \n(30) Business Days of such request. The Participating TO shall tender to \nthe applicant an Interconnection Agreement as provided in Section 8.1.3. \nIf costs are likely to be incurred to accommodate a request for \nInterconnection, the Participating TO shall tender to the applicant a \nFacilities Study Agreement pursuant to Section 10.8. \n10.8. Notice of Need for Facilities Study.  If a System Impact Study indicates that \nadditions or upgrades to the CAISO Controlled Grid are needed to satisfy an \napplicant’s request for interconnection, the Participating TO shall, within fifteen \n(15) Business Days of the date of the System Impact Study or the completion of \nreview and approval of the applicant’s System Impact Study by the Participating \nTO, tender to the applicant a Facilities Study Agreement that defines the scope, \ncontent, assumptions and terms of reference for such study to be completed by the \nParticipating TO; the estimated time required to complete the required study; and \nsuch other provisions as the parties may reasonably require, and pursuant to \nwhich the applicant agrees to reimburse the Participating TO for the reasonable \nactual costs of performing the required Facilities Study. Alternatively, if the \napplicant will perform the Facilities Study, the Participating TO shall within \nfifteen (15) Business Days of the completion date of the System Impact Study or \nthe completion of review and approval of the applicant’s System Impact Study, \ntender a Facilities Study Agreement that defines the scope, content, assumptions"},{"page":50,"startToken":19299,"endToken":19813,"text":"and terms of reference for such study to be reviewed by the Participating TO; the \nestimated time required to complete the required review; and such other \nprovisions as the parties may reasonably require, and pursuant to which the \napplicant agrees to reimburse the Participating TO for the reasonable actual costs \nof reviewing the required Facilities study. For an Interconnection request to \nremain a Completed Interconnection Application, the applicant shall execute the \nFacility Studies Agreement and return it to the Participating TO within ten (10) \nBusiness Days together with payment for the reasonable estimated costs of \nperforming the Facilities Study or reviewing the applicant’s Facilities Study. \nAlternatively, if the applicant request the Participating TO to proceed with the \nFacilities Study to review thereof and commits to abide by terms, conditions, and \ncost assignments ultimately determined under the CAISO ADR Procedures, \nincluding any determination by FERC or appeal of a FERC determination in \naccordance with that process, the Participating TO shall promptly proceed with \nthe Facilities Study provided that such request is accompanied by payment for the \nreasonable estimated cost of the Facilities Study, and the parties shall submit the \ndisputed terms for resolution under the CAISO ADR Procedures. If the applicant \nelects not to execute a Facilities Study Agreement and does not request that the \nParticipating TO proceed with the Facilities Study or review thereof, its \napplication shall be deemed withdrawn and the applicant shall reimburse to the \nParticipating TO all costs reasonably incurred in processing the application not \ncovered by the System Impact Study Agreement. \n10.9. Facilities Study Procedures.  Upon receipt of an executed Facilities Study \nAgreement or initiation of the CAISO ADR Procedures and receipt of payment for \nthe estimated study costs, the Participating TO will use due diligence to either (a) \ncomplete the required Facilities Study within a sixty (60) calendar day period or \n(b) complete its review of an applicant’s Facilities Study within thirty (30) \ncalendar days of its receipt of the Completed Study. In the event that Participating \nTO is unable to complete the required Facilities Study within such time period, it \nshall so notify the applicant, in writing, and provide an estimated completion date \nalong with an explanation of the reasons why additional time is required to \ncomplete the required studies. A copy of the completed Facilities Study shall be \nmade available to the applicant. \n10.9.1. Execution of Interconnection Agreement.  Within thirty (30) \nBusiness Days of receipt of the completed Facilities Study performed by \nthe Participating TO or receipt of written approval of the applicant’s \nFacilities Study from the Participating TO, the applicant shall request the \nParticipating TO to tender an Interconnection Agreement within thirty \n(30) Business Days of such request. The Participating TO shall tender to \nthe applicant an Interconnection Agreement as provided in Section 8.1.3. \n10.10. Partial Interim Service.  If the Participating TO determines that there will not \nbe adequate transmission capability to satisfy the full amount requested in a \nCompleted Interconnection Application, the Participating TO nonetheless shall be \nobligated to offer and provide the portion of the requested Interconnection that"},{"page":51,"startToken":19813,"endToken":20299,"text":"can be accommodated without any additional Direct Assignment Facilities or \nReliability Upgrades. However, the Participating TO shall not be obligated to \nprovide the incremental amount of requested Interconnection that requires such \nadditional facilities or upgrades until such facilities or upgrades have been placed \nin service. \n10.11. Expedited Procedures for New Facilities.  In lieu of the procedures set forth \nabove, the applicant shall have the option to expedite the processing of its \nCompleted Interconnection Application.  In order to exercise this option, the \napplicant shall submit in writing a Request for Expedited Interconnection \nProcedures to the Participating TO within ten (10) Business Days after receiving a \ncopy of the System Impact Study for the proposed Interconnection. Within ten \n(10) Business Days after receiving a Request for Expedited Procedures, the \nParticipating TO shall tender an Expedited Interconnection Agreement that \nrequires the applicant to compensate the Participating TO for all costs reasonably \nincurred pursuant to the terms of this TO Tariff for processing the Completed \nInterconnection Application and providing the requested Interconnection. While \nthe Participating TO agrees to provide the applicant with its best estimate of the \ncosts of any needed Direct Assignment Facilities and, if applicable, Reliability \nUpgrades, and such other charges that may be incurred, unless otherwise agreed \nby the parties, such estimate shall not be binding and the applicant must agree in \nwriting to compensate the Participating TO for all actual Interconnection costs \nreasonably incurred pursuant to the provisions of this TO Tariff. The applicant \nshall execute and return such Expedited Service Agreement within ten (10) \nBusiness Days of its receipt or the applicant’s request for Interconnection will \ncease to be a Completed Interconnection Application and will be deemed \nterminated and withdrawn, In that event, the applicant shall reimburse the \nParticipating TO for all costs reasonably incurred in processing the application \nnot covered by the terms of the System Impact Study Agreement. \n \n11. \nUncontrollable Forces and Indemnification. \n11.1. Procedures to Follow if Uncontrollable Force Occurs.  In the event of the \noccurrence of an Uncontrollable Force which prevents a Party from performing \nany of its obligations under this TO Tariff, such Party shall (i) immediately notify \nthe other Parties in writing of the occurrence of such Uncontrollable Force, (ii) \nnot be entitled to suspend performance in any greater scope or longer duration \nthan is required by the Uncontrollable Force, (iii) use its best efforts to mitigate \nthe effects of such Uncontrollable Force, remedy its inability to perform, and \nresume full performance hereunder, (iv) keep the other Parties apprised of such \nefforts on a continual basis and (v) provide written notice of the resumption of \nperformance hereunder. Notwithstanding any of the foregoing, the settlement of \nany strike, lockout, or labor dispute constituting an Uncontrollable Force shall be \nwithin the sole discretion of the Party to this TO Tariff involved in such strike, \nlockout, or labor dispute and the requirement that a Party must use its best efforts"},{"page":52,"startToken":20299,"endToken":20779,"text":"to remedy the cause of the Uncontrollable Force and mitigate its effects and \nresume full performance hereunder shall not apply to strikes, lockouts, or labor \ndisputes. No Party will be considered in default as to any obligation under this TO \nTariff if prevented from fulfilling the obligation due to the occurrence of an \nUncontrollable Force. \n11.2. Indemnification.  A Market Participant shall at all times indemnify, defend, and \nsave the Participating TO harmless from any and all damages, losses, claims, \n(including claims and actions relating to injury or to death of any person or \ndamage to property), demands, suits, recoveries, costs and expenses, court costs, \nattorney fees, and all other obligations by or to third parties, arising out of or \nresulting from the Participating TO's performance of its obligations under this TO \nTariff on behalf of a Market Participant, except in cases of negligence or \nintentional wrongdoing by the Participating TO. \n12. \nRegulatory Filings.  Nothing contained herein shall be construed as affecting, in any \nway, the right of DCRT to unilaterally make application to FERC as it deems necessary \nand appropriate to recover its TRR, or for a change in its terms and conditions, including \nchanges in rate methodology, or for a change in designation of transmission Entitlements \nto be placed under the CAISO’s control, pursuant to the applicable FERC rules, \nregulations, policies, and governing statutes. \n13. \nMiscellaneous. \n13.1. Notices.  Any notices, demand, or request in accordance with this TO Tariff, \nunless otherwise provided in this TO Tariff, shall be in writing and shall be \ndeemed properly served, given, or made: (i) upon delivery if delivered in person, \n(ii) five days after deposit in the mail if sent by first class United States mail, \npostage prepaid, (iii) upon receipt of confirmation by return electronic facsimile if \nsent by facsimile, or (iv) upon delivery if delivered by prepaid commercial courier \nservice, in each case addressed to a Party at the address set forth in Appendix II. \nAny Party may at any time, by notice to the other Parties, change the designation \nor address of the person specified in Appendix II to receive notice on its behalf. \nAny notice of a routine character in connection with service under this TO Tariff \nshall be given in such a manner as the Parties may determine from time to time, \nunless otherwise provided in this TO Tariff. \n13.2. Waiver.  Any waiver at any time by any Party of its rights with respect to any \ndefault under this TO Tariff, or with respect to any other matter arising in \nconnection with this TO Tariff, shall not constitute or be deemed a waiver with \nrespect to any subsequent default or other matter arising in connection with this \nTO Tariff. Any delay short of the statutory period of limitations in asserting or \nenforcing any right shall not constitute or be deemed a waiver. \n13.3. Confidentiality."},{"page":53,"startToken":20779,"endToken":21262,"text":"13.3.1. Maintaining Confidentiality if Not for Public Disclosure.  The \nParticipating TO shall maintain the confidentiality of all of the \ndocuments, data, and information provided to it by any other Party that \nsuch Party may designate as confidential, provided, however, that the \ninformation will not be held confidential by the receiving Party if (1) the \ndesignating Party is required to provide such information for public \ndisclosure pursuant to this TO Tariff or applicable regulatory \nrequirements, or (2) the information becomes available to the Public on a \nnon-confidential basis (other than from the receiving Party). \n13.3.2. Disclosure of Confidential Information.  Notwithstanding anything in \nthis Section 11.3.2 to the contrary, if any Party is required by applicable \nlaws or regulations, or in the course of administrative or judicial \nproceedings, to disclose information that is otherwise required to be \nmaintained in confidence pursuant to this Section 11.3.2, the Party may \ndisclose such information; provided, however, that as soon as such Party \nlearns of the disclosure requirement and prior to making such disclosure, \nsuch Party shall notify the affected Party or Parties of the requirement \nand the terms thereof. The affected Party or Parties may, at their sole \ndiscretion and own costs, direct any challenge to or defense against the \ndisclosure requirement and the disclosing Party shall cooperate with \nsuch affected Party or Parties to the maximum extent practicable to \nminimize the disclosure of the information consistent with applicable \nlaw. The disclosing Party shall cooperate with the affected Parties to \nobtain proprietary or confidential treatment of confidential information \nby the person to whom such information is disclosed prior to any such \ndisclosure. \n13.4. Titles.  The captions and headings in this TO Tariff are inserted solely to \nfacilitate reference and shall have no bearing upon the interpretation of any of the \nrates, terms, and conditions of this TO Tariff. \n13.5. Severability.  If any term, covenant, or condition of this TO Tariff or the \napplication or effect of any such term, covenant, or condition is held invalid as to \nany person, entity, or circumstance, or is determined to be unjust, unreasonable, \nunlawful, imprudent, or otherwise not in the public interest, by any court or \ngovernment agency of competent jurisdiction, then such term, covenant, or \ncondition shall remain in force and effect to the maximum extent permitted by \nlaw, and all other terms, covenants, and conditions of this TO Tariff and their \napplication shall not be affected thereby but shall remain in force and effect. The \nParties shall be relieved of their obligations only to the extent necessary to \neliminate such regulatory or other determination, unless a court or governmental \nagency of competent jurisdiction holds that such provisions are not severable \nfrom all other provisions of this TO Tariff. \n13.6. Preservation of Obligations.  Upon termination of this TO Tariff, all unsatisfied \nobligations of each Party shall be preserved until satisfied."},{"page":54,"startToken":21262,"endToken":21481,"text":"13.7. Governing Law.  This TO Tariff shall be interpreted, governed by, and construed \nunder the laws of the State of California, without regard to the principles of \nconflict of laws thereof, or the laws of the United States, as applicable, as if \nexecuted and to be performed wholly within the State of California. \n13.8. Appendices Incorporated.  The appendices to this TO Tariff are attached to this \nTO Tariff and are incorporated by reference as if fully set forth herein. \n13.9. Consistency with CAISO Tariff.  This TO Tariff is intended to be consistent \nwith the CAISO Tariff, and, if necessary, shall be amended to conform with any \nchanges authorized or required in any final order in a FERC proceeding \nmandating such changes in the CAISO Tariff. \n13.10. Disputes.  Except as limited by law, the CAISO ADR Procedures shall apply to \nall disputes between parties which arise under this TO Tariff or under or in respect \nof the proposed terms and conditions of a Facilities Study Agreement, System \nImpact Study Agreement or Expedited Service Agreement. The CAISO ADR \nProcedures set forth in Section 13 of the CAISO Tariff shall not apply to disputes \nas to whether rates and charges set forth in this TO Tariff (other than charges for \nstudies) are just and reasonable under the FPA."},{"page":55,"startToken":21481,"endToken":21489,"text":"APPENDIX IV \n \nLarge Load Interconnection Process and Timeline"},{"page":56,"startToken":21489,"endToken":21964,"text":"2 \n \nAppendix IV \nto the DCRT TO Tariff \n \nLarge Load Interconnection Process and Timeline \n1.1 \nApplicability. This Appendix IV shall govern all requests for Interconnection \nsubmitted by Large Load Interconnection Customers seeking to interconnect a Large \nLoad directly to the Participating TO’s Transmission System. Participating TO shall \ncoordinate with the CAISO to implement the interconnection of a Large Load as needed \npursuant to Section 4.3 to this Appendix IV. Coordination with the CAISO pursuant to \nSection 4.3 of this Appendix IV may require that Participating TO, Large Load \nInterconnection Customer and the CAISO negotiate revised deadlines for the \nprocessing of the Large Load Interconnection Customer’s interconnection request. \nSuch revised deadlines will be included in the Large Load Interconnection Customer’s \nLarge Load System Impact Study Agreement and Large Load Facilities Study \nAgreement included with these procedures as Attachments 1 and 2 to this Appendix IV, \nrespectively.  \n1.2 \nApplication Required. A Large Load Interconnection Customer shall submit a written \nLarge Load Interconnection Application that provides the information required in \nSection 1.4 to this Appendix IV. The Participating TO shall time-stamp the application \nto establish study priority and send a copy to any other transmission providers whose \ntransmission facilities potentially may be impacted by the interconnection of the Large \nLoad Interconnection Customer’s Large Load based on Participating TO’s review of \nthe application. Participating TO will also provide the Large Load Interconnection \nCustomer’s application to the CAISO pursuant to Section 4.3.  \n1.3 \nProcess Overview. Participating TO’s processing of a Large Load Interconnection \nApplication will proceed in four stages: (1) Sufficiency Review of the Large Load \nInterconnection Application; (2) Large Load System Impact Study; (3), Large Load \nFacilities Study; and (4) negotiation of a Large Load Interconnection Agreement based \non the pro forma agreement provided as Attachment 3 to this Appendix IV. In the first \nstage, Participating TO will review the Large Load Interconnection Application for \ncompleteness and sufficiency of the provided information, verify the submitted \ninformation, and provide an opportunity to cure any deficiencies found. In the second \nphase, Participating TO will execute the Large Load System Impact Study Agreement \nincluded as Attachment 1 to this Appendix IV with the Large Load Interconnection \nCustomer; perform the Large Load System Impact Study; submit the study results to \nthe Large Load Interconnection Customer; and conduct a study review meeting with \nthe Large Load Interconnection Customer. In the third phase, Participating TO will \nexecute the Large Load Facilities Study Agreement included as Attachment 2 to this \nAppendix IV and Participating TO will perform the Large Load Facilities Study to \naddress detailed engineering design; submit the study results to the Large Load \nInterconnection Customer; and conduct a final study review meeting with the Large \nLoad Interconnection Customer. In the fourth phase, Participating TO will negotiate \nand execute a Large Load Interconnection Agreement with the Large Load"},{"page":57,"startToken":21964,"endToken":22245,"text":"3 \n \nInterconnection Customer. Participating TO will coordinate with the Large Load \nInterconnection Customer to facilitate any studies required to determine the impact of \nthe Large Load Interconnection Application on Affected Systems.  \n1.4 \nInterconnection Application Contents. A Large Load Interconnection Application \nfrom a Large Load Interconnection Customer shall provide the following: \n(i) \nThe identity, address, telephone number, and email address for the contacts \nfor the entity requesting Interconnection for the relevant Large Load; \n(ii) \nA signed copy of a Large Load System Impact Study Agreement, ready for \nexecution by Participating TO; \n(iii) \nAt least three (3) dates/times the Large Load Interconnection Customer is \navailable to meet with Participating TO within one (1) week of the Large \nLoad Interconnection Application’s submission;  \n(iv) \nThe Point(s) of Interconnection to the Participating TO’s system \ncontemplated by the applicant; \n(v) \nThe resultant (or new) maximum amount of Interconnection capacity \ncontemplated by the Large Load Interconnection Customer; \n(vi) \nThe proposed date for energizing the Large Load and the term of Large Load \nInterconnection Service;  \n(vii) The electrical location of the source of the power (if known) to be transmitted \npursuant to the Large Load Interconnection Customer’s request for \nInterconnection. If the source of the power is not known, a system purchase \nwill be assumed; \n(viii) The electrical location of the ultimate load (if known). If the location of the \nload is not known, a system sale will be assumed; \n(ix) \nEnergization plans and expected in-service dates; \n(x) \nThe following physical characteristics of the prospective Large Load, \nsufficient to characterize expected load behavior, including: \na. \nLoad type \nb. \nVariable or flat load designation \nc. \nExpected hourly operating profile \nd. \nLocation of service \ne. \nPoint of delivery"},{"page":58,"startToken":22245,"endToken":22390,"text":"4 \n \nf. \nConnected capacity \ng. \nAny market participation status or expected participation in demand \nresponse programs \nh. \nMaximum operating demand \ni. \nMinimum operating demand \nj. \nCurtailment capability \nk. \nExpected hourly flexibility capability \nl. \nRamp-up capability \nm. \nRamp-down capability \nn. \nPreliminary site layout \no. \nModelling inputs for steady-state and transient studies \np. \nLocation, size, and connection of every transformer and large motor \nq. \nEvidence of site control \nr. \nAttestation by officer of accuracy of submitted Large Load \nInterconnection Application \n(xi) \nCo-located resource information, if applicable: \na. \nPresence of co-located generation \nb. \nWhether the resource will be fully Behind-the-Meter or may export to \nthe CAISO Controlled Grid \nc. \nResource type \nd. \nNameplate capacity \ne. \nMinimum and maximum operating levels \nf. \nMarket participation status \ng. \nAssociated status resource identifiers \nh. \nAll information required by the Participating TO and, as applicable, the \nCAISO in the Large Generator Interconnection Application"},{"page":59,"startToken":22390,"endToken":22798,"text":"5 \n \n(xii) \nSuch other information as the Participating TO reasonably requires to \nprocess the Large Load Interconnection Application. \n1.4.2 Large Load Interconnection Application Fee. A Large Load Interconnection \nCustomer shall submit a non-refundable application fee of two-hundred-\nthousand dollars ($200,000).  \n1.4.3 Amendment to Completed Large Load Interconnection Application. A \nLarge Load Interconnection Customer shall be limited to only amending its \nLarge Load Interconnection Application once.  Additional amendments will be \nat Participating TO’s discretion, to be permitted on a not unduly discriminatory \nbasis and without undue preference or advantage, and Participating TO’s \nagreement for Large Load Interconnection Customer to make additional \namendment shall not be unreasonably withheld.  Such amendment shall occur \nno later than ten (10) Business Days after the date the Participating TO tenders \nthe Large Load System Impact Study report. Specifically, a Large Load \nInterconnection Customer may submit an amendment to its Interconnection \nApplication to reflect a revised configuration for its Large Load. In the event a \nLarge Load Interconnection Customer amends its Large Load Interconnection \nApplication, it will be responsible for any additional study costs that result from \nthat amendment. \n1.5 \nWithdrawal of Large Load Interconnection Application. A Large Load \nInterconnection Customer may withdraw its Large Load Interconnection Application \nat any time by providing notice to Participating TO in writing. A withdrawal shall not \nresult in the refund of any previously paid application fees.  \n2. Application Processing and Timeline. The Large Load Interconnection Application will be \nprocessed under the procedures and timeline described below: \n2.1 \nSufficiency Review. Within five (5) Business Days of receipt of a Large Load \nInterconnection Application and application fee, Participating TO will complete its \nsufficiency review of the Large Load Interconnection Application and provide the \nLarge Load Interconnection Customer with either a notice of sufficiency or a deficiency \nletter for the Large Load Interconnection Application, via email. A deficiency letter will \nspecify the necessary changes to meet the Large Load Interconnection Application \nrequirements. \n2.1.1 Cure of Deficiency. If a Large Load Interconnection Customer receives a \ndeficiency letter, it will have three (3) Business Days to re-submit a revised \nLarge Load Interconnection Application curing the deficiencies identified in the \ndeficiency letter.  \n2.1.2 Review of Resubmitted Large Load Interconnection Application. If the \nLarge Load Interconnection Customer receives a deficiency letter and timely \nre-submits a revised Large Load Interconnection Application, within five (5) \ncalendar days, Participating TO will conduct another sufficiency review of the"},{"page":60,"startToken":22798,"endToken":23285,"text":"6 \n \nresubmitted application and notify the Large Load Interconnection Customer of \nthe sufficiency or deficiency of the resubmitted application. A second finding \nof deficiency will result in the application being deemed withdrawn.   \n2.2 \nLarge Load System Impact Study. Within seven (7) calendar days of approving a \ncompleted Large Load Interconnection Application, Participating TO and Large Load \nInterconnection Customer shall execute the Large Load System Impact Study \nAgreement included in the initial Large Load Interconnection Application and conduct \nan initial Scoping Meeting. The system impact study will consist of a short circuit \nanalysis, a stability analysis, a power flow analysis, and any other studies that are \ndeemed necessary. The system impact study shall state the assumptions upon which it \nis based, state the results of the analyses, and provide the requirement or potential \nimpediments to providing the requested Large Load Interconnection Service, including \na preliminary indication of the cost and length of time that would be necessary to \ncorrect any problems identified in those analyses and implement the Interconnection.   \nThe Large Load System Impact Study shall provide a list of Large Load \nInterconnection Facilities and Network Upgrades that are required to interconnect the \nrelevant Large Load and provide a non-binding good faith estimate of cost \nresponsibility and the amount of construction time required. The Large Load System \nImpact Study shall also identify any Affected Systems that Participating TO must \ncoordinate with in order to interconnect the Large Load Interconnection Customer.  \n2.2.1 Large Load System Impact Study Fee. If the Large Load System Impact \nStudy costs exceed the Large Load Interconnection Application Fee, the Large \nLoad Interconnection Customer shall reimburse the Participating TO for the \nactual study costs that exceed the initial application fee of two-hundred-\nthousand dollars ($200,000).  \n2.2.2 Large Load System Impact Study Timeline. Within thirty (30) calendar days \nof execution of the Large Load System Impact Study Agreement, Participating \nTO, using reasonable efforts, will perform the Large Load System Impact \nStudy, prepare and submit a study report to the Large Load Interconnection \nCustomer, and provide the Large Load Interconnection Customer with an initial \ndraft Large Load Interconnection Agreement reflecting the results of the Large \nLoad System Impact Study. This draft Large Load Interconnection Agreement \nwill be revised based on the Large Load Facilities Study described in Section \n2.3. Within seven calendar (7) days of submitting the Large Load System \nImpact Study report to the Large Load Interconnection Customer, using \nreasonable efforts, Participating TO will schedule a meeting with the Large \nLoad Interconnection Customer and the CAISO, as applicable pursuant to \nSection 4.3, to review the results of the Large Load System Impact Study. \n2.3 \nLarge Load Facilities Study. The Large Load Facilities Study will be used to create \nthe detailed design of the interconnection facilities used to interconnect the Large Load \nto the Participating TO’s facilities, based on the findings of the Large Load System \nImpact Study."},{"page":61,"startToken":23285,"endToken":23726,"text":"7 \n \n2.3.1 Large Load Facilities Study Timeline. The Large Load Interconnection \nCustomer will have seven (7) calendar days after receiving the Large Load \nSystem Impact Study results to execute a Large Load Facilities Study \nAgreement with Participating TO or its Large Load Interconnection Application \nwill be deemed withdrawn. Within thirty (30) calendar days of execution of the \nLarge Load Facilities Study Agreement, using reasonable efforts, Participating \nTO will conduct the Large Load Facilities Study and submit the study report to \nthe Large Load Interconnection Customer.  \n2.3.2 Large Load Facilities Study Fee. The Large Load Interconnection Customer \nshall submit a non-refundable study fee of two-hundred thousand dollars \n($200,000) upon execution of the Large Load Facilities Study Agreement. If the \nLarge Load Facilities Study costs exceed the study fee, the Large Load \nInterconnection Customer shall promptly reimburse the Participating TO for the \nactual study costs that exceed the default study fee.  \n2.4 \nConsideration of Alternative Transmission Technologies. The Large Load System \nImpact Study and Large Load Facilities Study will consider both traditional Network \nUpgrades and Alternative Transmission Technologies when evaluating options for \nreliably interconnecting the Large Load. Alternative Transmission Technologies to be \nstudied will include, as applicable, static synchronous compensators, static VAR \ncompensators, advanced power flow control devices, transmission switching, \nsynchronous condensers, voltage source converters, advanced conductors, and tower \nlifting. The Participating TO’s studies, will select the best available transmission \nsolution to interconnect Large Load. If a traditional Network Upgrade solution is \nselected instead of Alternative Transmission Technologies, the Participating TO will \nexplain why Alternative Transmission Technologies are not feasible (i.e., would not \nresolve reliability violations identified or meet the relevant planning criteria) or would \nnot result in lower costs or a faster timeline for accommodating the interconnection of \nthe Large Load. \n2.5 \nLarge Load Interconnection Agreement.  \n2.5.1 Large Load Interconnection Agreement Timeline. Within sixty (60) calendar \ndays of receipt of the Large Load Facilities Study report, Large Load \nInterconnection Customer shall execute a Large Load Interconnection \nAgreement with Participating TO or request that an unexecuted Large Load \nInterconnection Agreement be filed with FERC for resolution of any dispute \nover the terms of the Large Load Interconnection Agreement, or the Large Load \nInterconnection Application will be deemed withdrawn.  \n2.5.2 Large Load Interconnection Agreement Signatories and Terms. The Large \nLoad Interconnection Agreement will be negotiated between the Large Load \nInterconnection Customer and Participating TO, with, the CAISO also signing, \nas applicable pursuant to Section 4.3. The Large Load Interconnection \nAgreement will obligate the Large Load Interconnection Customer to pay the \ncost of interconnecting the Large Load to the Participating TO’s system,"},{"page":62,"startToken":23726,"endToken":24140,"text":"8 \n \nincluding procurement, construction, and commissioning of the interconnection \nfacilities based on the terms within the Large Load Interconnection Agreement. \nParticipating TO will not perform any procurement or construction associated \nwith interconnecting the Large Load until the Large Load Interconnection \nAgreement is executed and all funding identified in the Large Load \nInterconnection Agreement is received. The Large Load Interconnection \nAgreement will address reimbursement to the Large Load Interconnection \nCustomer for any Network Upgrades. \n2.5.3 Construction of Interconnection Facilities. Based on the designs produced by \nthe Large Load Facilities Study, Participating TO will procure necessary \nequipment, and construct the interconnection facilities required to interconnect \nthe Large Load to the Participating TO’s system.  \n2.6 \nInterconnection Financial Security Agreements.  A Large Load Interconnection \nCustomer intending to proceed with interconnection shall post financial security \naccording to the timelines identified in Attachment 4 to this Appendix IV, or its \napplication will be deemed withdrawn.  \n2.6.1 Initial Postings. Within ninety (90) calendar days of receipt of the Facilities \nStudy report, a Large Load Interconnection Customer shall execute separate \nInterconnection Financial Security Agreements and post financial security for \neach of: 1) its assigned Network Upgrades; and 2) its Interconnection Facilities. \n2.6.2 Second Postings.  Second postings and amended Interconnection Financial \nSecurity Agreements are required no later than thirty (30) calendar days prior \nto the date on which the Facilities Study report provides that such amounts will \nbe needed to fund long lead time equipment procurement as part of the \nConstruction Activities (as defined in Attachment 4) for the Network Upgrades \n(as defined in Attachment 3) or the Participating TO’s Interconnection \nFacilities, whichever is earlier. \n2.6.3 Third Postings.  No later than thirty (30) calendar days after the date on which \nthe Participating TO provides notice that Participating TO is obligated to \nprovide security needed to fund any additional obligations for Network \nUpgrades (as defined in Attachment 3) or Participating TO’s Interconnection \nFacilities on behalf of the Large Load Interconnection Customer, whichever is \nearlier, the Large Load Interconnection Customer shall modify the two separate \nInterconnection Financial Security instruments. \n3. Flexible Interim Load Interconnection Service.  \n3.1 \nAvailability of Flexible Interim Load Interconnection Service. If a Large Load \nSystem Impact Study conducted for a Large Load Interconnection Customer shows that \nthe Large Load cannot be reliably served at its full requested demand until certain \nNetwork Upgrades are completed, Participating TO may, at the Large Load \nInterconnection Customer’s request offer FILI Service. Based on the study results,"},{"page":63,"startToken":24140,"endToken":24625,"text":"9 \n \nParticipating TO, and, as applicable, the CAISO pursuant to Section 4.3, may propose \na customized plan for the Large Load Interconnection Customer based on the type of \nconstraints required to maintain Transmission System reliability. Such constraints may \nrequire flexibility in demand by the Large Load or any other conditions that \nParticipating TO and, as applicable, the CAISO determine are necessary to maintain \nreliability. The Large Load Interconnection Customer may participate in the design of \nthe FILI Service constraints. Once the required Network Upgrades necessary to serve \nthe Large Load at its full requested demand are complete, the Large Load \nInterconnection Customer may elect to receive firm service.  The scope of any FILI \noffered to the Large Load Interconnection Customer will be memorialized in the Large \nLoad Interconnection Agreement. \n4. Participating TO Obligation to Provide Interconnection Service. \n4.1 \nInterconnection to Transmission System.  Interconnection Services for Large Loads \nmust be consistent with Good Utility Practice, in conformance with all Applicable \nReliability Criteria, all applicable statutes, regulations, the Participating TO’s reliability \ncriteria and, as applicable, the CAISO reliability criteria for the CAISO Controlled \nGrid. The Participating TO will not provide Large Load Interconnection Services to the \nLarge Load Interconnection Customer if doing so would impair reliability. \n4.2 \nEnergization.  The Participating TO shall not be obligated to energize, nor shall the \nLarge Load Interconnection Customer be entitled to have its interconnection to the \nParticipating TO’s system energized, unless and until a Large Load Interconnection \nAgreement has been executed, or filed at FERC pursuant to Section 2.5.1 and becomes \neffective and such Large Load Interconnection Customer has demonstrated to the \nParticipating TO’s reasonable satisfaction that it has complied with all of the \nrequirements of the of the Participating TO’s Tariff, and, as applicable, the CAISO \nTariff. \n4.3 \nCoordination with the CAISO on Interconnection Requests. Participating TO \nreserves the right to coordinate with the CAISO to the extent that the interconnection \nof a Large Load may impact the reliability of the CAISO controlled transmission \nsystem. The potential injection of any power from a Large Load to the Participating \nTO’s Transmission System, including but not limited to the injection of power to the \nParticipating TO’s Transmission System resulting from the colocation of generation \nwith the Large Load facility, shall require that the Participating TO coordinate with the \nCAISO to ensure that the Large Load’s interconnection complies with the CAISO \nTariff.    \n4.4 \nCoordination with Affected Systems. Participating TO will coordinate with the Large \nLoad Interconnection Customer to facilitate any studies required to determine the \nimpact of the Large Load Interconnection Application on Affected Systems. \nParticipating TO may provide a copy of the Large Load System Impact Study and Large \nLoad Facilities Study results to an Affected System Operator and the Western \nElectricity Coordinating Council. Requests for review and input from Affected System \nOperators or the Western Electricity Coordinating Council may arrive at any time prior"},{"page":64,"startToken":24625,"endToken":24692,"text":"10 \n \nto interconnection. If interconnecting the Large Load Interconnection Customer \nrequires upgrades to any Affected Systems, Large Load Interconnection Customer must \nenter into a construction and reimbursement agreement with the owner of any Affected \nSystem and/or other affected owners of portions of the CAISO Controlled Grid that \ngovern facilities built on the relevant Affected System, pursuant to the tariff or \nprocedures of the Affected System owner."},{"page":65,"startToken":24692,"endToken":24714,"text":"Appendix IV \nAttachment 1  \nLarge Load System Impact Study Agreement \nfor Interconnection Requests Processed under the Large Load Interconnection Process and \nTimeline"},{"page":66,"startToken":24714,"endToken":25039,"text":"2 \n \nAttachment 1  \nto the DCRT Large Load Interconnection Process and Timeline  \nDCRT TO Tariff, Appendix IV  \n \nLARGE LOAD SYSTEM IMPACT STUDY AGREEMENT \n[LARGE LOAD INTERCONNECTION CUSTOMER] \nAND \nDCR TRANSMISSION, L.L.C. \nTHIS AGREEMENT is made and entered into this day of ___________, 20__ by and \nbetween ___________, a ___________ organized and existing under the laws of the \nState/Commonwealth of___________, (“Large Load Interconnection Customer”) and DCR \nTransmission, L.L.C., a limited liability company, organized and existing under the laws of the \nState of Delaware, (“DCRT” or “Participating TO”). The Large Load Interconnection Customer \nand DCRT each may be referred to as a “Party,” or collectively as the “Parties.” \nRECITALS \nWHEREAS, Large Load Interconnection Customer is proposing to develop a Large Load \nFacility or Large Load Facility expansion to an existing Large Load Facility consistent with the \nLarge Load Interconnection Application submitted by the Large Load Interconnection Customer \ndated   \n; and \nWHEREAS, the Large Load Interconnection Customer desires to interconnect the Large \nLoad Facility with the California Independent System Operator Corporation (“CAISO”) \nControlled Grid pursuant to the Large Load Interconnection Process; and \nWHEREAS, the Large Load Interconnection Customer has requested DCRT to conduct or \ncause to be performed a Large Load System Impact Study to assess the system impact of \ninterconnecting the Large Load Facility to the CAISO Controlled Grid and to specify and estimate \nthe cost of the equipment, engineering, procurement and construction work needed on the \nParticipating TO’s electric system in accordance with Good Utility Practice to physically and \nelectrically connect the Large Load Facility to the CAISO Controlled Grid; \nNOW, THEREFORE, in consideration of and subject to the mutual covenants contained \nherein the Parties agree as follows: \n1.0 \nWhen used in this Agreement, with initial capitalization, the terms specified shall \nhave the meanings indicated in DCRT’s Federal Energy Regulatory Commission \n(“FERC”)-approved Large Load Interconnection Process in the DCRT Tariff, or \nthe Master Definitions Supplement, Appendix A to the CAISO Tariff, as \napplicable."},{"page":67,"startToken":25039,"endToken":25494,"text":"3 \n \n2.0 \nThe Large Load Interconnection Customer elects and DCRT shall conduct or cause \nto be performed a Large Load System Impact Study in accordance with the DCRT \nTariff, Appendix IV. \n3.0 \nThe scope of the applicable Large Load System Impact Study shall be subject to \nthe assumptions set forth in Appendices A and B to this Agreement. \n4.0 \nThe Large Load System Impact Study will be based upon the technical information \nprovided by the Large Load Interconnection Customer in the Large Load \nInterconnection Application, as may be modified as the result of the Scoping \nMeeting, subject to any modifications in accordance with Section 1.4.2 of the \nDCRT Tariff, Appendix IV and modifications to the proposed Commercial \nOperation Date of the Large Load Facility permitted by the Large Load \nInterconnection Process. DCRT reserves the right to request additional technical \ninformation from the Large Load Interconnection Customer as may reasonably \nbecome necessary consistent with Good Utility Practice during the course of the \nLarge Load System Impact Study. If the Large Load Interconnection Customer \nmodifies its designated Point of Interconnection, Large Load Interconnection \nApplication, or the technical information provided therein is modified, the Large \nLoad System Impact Study may be modified as specified in the DCRT Tariff, \nAppendix IV. \n5.0 \nThe Large Load System Impact Study report shall provide the information specified \nin the Large Load Interconnection Process. \n6.0 \nThe Large Load Interconnection Customer shall provide a Large Load \nInterconnection Application fee for the performance of the Large Load System \nImpact Study in accordance with the provisions of Section 1.4.1 of the Large Load \nInterconnection Process. \n7.0 \nPursuant to Section 4.4 of the Large Load Interconnection Process, DCRT will \ncoordinate with the Large Load Interconnection Customer to facilitate any studies \nrequired to determine the impact of the Large Load Interconnection Application on \nAffected Systems. DCRT may provide a copy of the system impact and facilities \nstudy results to an Affected System Operator and the Western Electricity \nCoordinating Council. Requests for review and input from Affected System \nOperators or the Western Electricity Coordinating Council may arrive at any time \nprior to interconnection. \n8.0 \nSubstantial portions of technical data and assumptions used to perform the Large \nLoad System Impact Study, such as system conditions, existing and planned \ngeneration, and unit modeling, may change after DCRT provides the Large Load \nSystem Impact Study results to the Large Load Interconnection Customer. Large \nLoad System Impact Study results will reflect available data at the time DCRT \nprovides the system impact and facilities study report to the Large Load \nInterconnection Customer. DCRT shall not be responsible for any additional costs, \nincluding, without limitation, costs of new or additional facilities, system upgrades,"},{"page":68,"startToken":25494,"endToken":25930,"text":"4 \n \nor schedule changes, that may be incurred by the Large Load Interconnection \nCustomer as a result of changes in such data and assumptions. \n9.0 \nDCRT shall maintain records and accounts of all costs incurred in performing the \nLarge Load System Impact Study in sufficient detail to allow verification of all \ncosts incurred, including associated overheads. The Large Load Interconnection \nCustomer shall have the right, upon reasonable notice, within a reasonable time at \nDCRT’s offices and at its own expense, to audit DCRT’s records as necessary and \nas appropriate in order to verify costs incurred by DCRT. Any audit requested by \nthe Large Load Interconnection Customer shall be completed, and written notice of \nany audit dispute provided to DCRT representative, within one hundred eighty \n(180) calendar days following receipt by the Large Load Interconnection Customer \nof DCRT’s notification of the final costs of the Interconnection Study. \n10.0  In accordance with Section 1.5 of the Large Load Interconnection Process, the \nLarge Load Interconnection Customer may withdraw its Large Load \nInterconnection Application at any time by written notice to DCRT.  \nWithin ninety (90) days of receiving the withdrawal notice of the Large Load \nInterconnection Application, DCRT will refund the unused amount of the Large \nLoad Interconnection Study Application fee to the Large Load Interconnection \nCustomer.  \n11.0  This Agreement shall become effective upon the date the fully executed Agreement \nis submitted to the Large Load Interconnection Customer by DCRT.  \n12.0 \nMiscellaneous. \n12.1 \nDispute Resolution. Any dispute, or assertion of a claim, arising out of or in \nconnection with this Agreement, shall be resolved in accordance with Section 13.10 \nof the DCRT Tariff. \n12.2 \nConfidentiality. Confidential Information shall be treated in accordance with \nSection 13.3 of the DCRT Tariff. \n12.3 \nBinding Effect. This Agreement and the rights and obligations hereof, shall be \nbinding upon and shall inure to the benefit of the successors and assigns of the \nParties hereto. \n12.4 \nConflicts. In the event of a conflict between the body of this Agreement and any \nattachment, appendices or exhibits hereto, the terms and provisions of the body of \nthis Agreement shall prevail and be deemed the final intent of the Parties. \n12.5 \nRules of Interpretation. This Agreement, unless a clear contrary intention appears, \nshall be construed and interpreted as follows: (1) the singular number includes the \nplural number and vice versa; (2) reference to any person includes such person’s \nsuccessors and assigns but, in the case of a Party, only if such successors and \nassigns are permitted by this Agreement, and reference to a person in a particular"},{"page":69,"startToken":25930,"endToken":26440,"text":"5 \n \ncapacity excludes such person in any other capacity or individually; (3) reference \nto any agreement (including this Agreement), document, instrument or tariff means \nsuch agreement, document, instrument, or tariff as amended or modified and in \neffect from time to time in accordance with the terms thereof and, if applicable, the \nterms hereof; (4) reference to any applicable laws and regulations means such \napplicable laws and regulations as amended, modified, codified, or reenacted, in \nwhole or in part, and in effect from time to time, including, if applicable, rules and \nregulations promulgated thereunder; (5) unless expressly stated otherwise, \nreference to any Article, Section or Appendix means such Article or Section of this \nAgreement or such Appendix to this Agreement, as the case may be; (6) \n“hereunder”, “hereof”, “herein”, “hereto” and words of similar import shall be \ndeemed references to this Agreement as a whole and not to any particular Article, \nSection, or other provision hereof or thereof; (7) “including” (and with correlative \nmeaning “include”) means including without limiting the generality of any \ndescription preceding such term; and (8) relative to the determination of any period \nof time, “from” means “from and including”, “to” means “to but excluding” and \n“through” means “through and including”. \n12.6 \nEntire Agreement. This Agreement, including all Appendices and Schedules \nattached hereto, constitutes the entire agreement between the Parties with reference \nto the subject matter hereof, and supersedes all prior and contemporaneous \nunderstandings or agreements, oral or written, between the Parties with respect to \nthe subject matter of this Agreement. There are no other agreements, \nrepresentations, warranties, or covenants which constitute any part of the \nconsideration for, or any condition to, any Party’ s compliance with its obligations \nunder this Agreement. \n12.7 \nNo Third-Party Beneficiaries. This Agreement is not intended to and does not create \nrights, remedies, or benefits of any character whatsoever in favor of any persons, \ncorporations, associations, or entities other than the Parties, and the obligations \nherein assumed are solely for the use and benefit of the Parties, their successors in \ninterest and, where permitted, their assigns. \n12.8 \nWaiver. The failure of a Party to this Agreement to insist, on any occasion, upon \nstrict performance of any provision of this Agreement will not be considered a \nwaiver of any obligation, right, or duty of, or imposed upon, such Party. \nAny waiver at any time by either Party of its rights with respect to this Agreement \nshall not be deemed a continuing waiver or a waiver with respect to any other failure \nto comply with any other obligation, right, duty of this Agreement. Termination or \ndefault of this Agreement for any reason by the Large Load Interconnection \nCustomer shall not constitute a waiver of the Large Load Interconnection \nCustomer’s legal rights to obtain an interconnection from the Participating TO. Any \nwaiver of this Agreement shall, if requested, be provided in writing. \nAny waivers at any time by any Party of its rights with respect to any default under \nthis Agreement, or with respect to any other matter arising in connection with this"},{"page":70,"startToken":26440,"endToken":26947,"text":"6 \n \nAgreement, shall not constitute or be deemed a waiver with respect to any \nsubsequent default or other matter arising in connection with this Agreement. Any \ndelay, short of the statutory period of limitations, in asserting or enforcing any right \nunder this Agreement shall not constitute or be deemed a waiver of such right. \n12.9 \nHeadings. The descriptive headings of the various Articles and Sections of this \nAgreement have been inserted for convenience of reference only and are of no \nsignificance in the interpretation or construction of this Agreement. \n12.10 Multiple Counterparts. This Agreement may be executed in two or more \ncounterparts, each of which is deemed an original but all constitute one and the \nsame instrument. \n12.11 Amendment. The Parties may by mutual agreement amend this Agreement by a \nwritten instrument duly executed by both of the Parties. \n12.12 Modification by the Parties. The Parties may by mutual agreement amend the \nAppendices to this Agreement by a written instrument duly executed by both of the \nParties. Such amendment shall become effective and a part of this Agreement upon \nsatisfaction of all applicable laws and regulations. \n12.13 Reservation of Rights. DCRT shall have the right to make a unilateral filing with \nFERC to modify this Agreement with respect to any rates, terms and conditions, \ncharges, classifications of service, rule or regulation under section 205 or any other \napplicable provision of the Federal Power Act and FERC’s rules and regulations \nthereunder, and Large Load Interconnection Customer shall have the right to make \na unilateral filing with FERC to modify this Agreement pursuant to section 206 or \nany other applicable provision of the Federal Power Act and FERC’s rules and \nregulations thereunder; provided that each Party shall have the right to protest any \nsuch filing by another Party and to participate fully in any proceeding before FERC \nin which such modifications may be considered. Nothing in this Agreement shall \nlimit the rights of the Parties or of FERC under sections 205 or 206 of the Federal \nPower Act and FERC’s rules and regulations thereunder, except to the extent that \nthe Parties otherwise mutually agree as provided herein. \n12.14 No Partnership. This Agreement shall not be interpreted or construed to create an \nassociation, joint venture, agency relationship, or partnership between the Parties \nor to impose any partnership obligation or partnership liability upon any Party. No \nParty shall have any right, power or authority to enter into any agreement or \nundertaking for, or act on behalf of, or to act as or be an agent or representative of, \nor to otherwise bind, another Party. \n12.15 Assignment. This Agreement may be assigned by a Party only with the written \nconsent of the other Party; provided that a Party may assign this Agreement without \nthe consent of the other Party to any Affiliate of the assigning Party with an equal \nor greater credit rating and with the legal authority and operational ability to satisfy \nthe obligations of the assigning Party under this Agreement; and provided further"},{"page":71,"startToken":26947,"endToken":27172,"text":"7 \n \nthat the Large Load Interconnection Customer shall have the right to assign this \nAgreement, without the consent of the other Party, for collateral security purposes \nto aid in providing financing for the Large Load Facility, provided that the Large \nLoad Interconnection Customer will require any secured party, trustee or \nmortgagee to notify the other Party of any such assignment. Any financing \narrangement entered into by the Large Load Interconnection Customer pursuant to \nthis Section will provide that prior to or upon the exercise of the secured party’s, \ntrustee’s or mortgagee’s assignment rights pursuant to said arrangement, the \nsecured creditor, the trustee or mortgagee will notify the other Party of the date and \nparticulars of any such exercise of assignment right(s). Any attempted assignment \nthat violates this Section is void and ineffective. Any assignment under this \nAgreement shall not relieve a Party of its obligations, nor shall a Party’s obligations \nbe enlarged, in whole or in part, by reason thereof. Where required, consent to \nassignment will not be unreasonably withheld, conditioned or delayed. \nIN WITNESS WHEREOF, the Parties have caused this Agreement to be duly executed by \ntheir duly authorized officers or agents on the day and year first above written. \nDCR Transmission, L.L.C. \nBy:  \n \nPrinted Name:  \n \nTitle:  \n \nDate:  \n \n[Insert name of the Large Load Interconnection Customer] \nBy:  \n \nPrinted Name:  \n \nTitle:  \n \nDate:"},{"page":72,"startToken":27172,"endToken":27250,"text":"Appendix A \n \nASSUMPTIONS USED IN CONDUCTING THE \nSYSTEM IMPACT STUDY \nThe system impact and facilities study will be based upon the information set forth in the \nLarge Load Interconnection Application and agreed upon in the Scoping Meeting held on \n__________, subject to any modifications in accordance with Section 1.4.2 of the Large Load \nInterconnection Process, and the following assumptions: \nDesignation of Point of Interconnection and configuration to be studied. \n \n[Fill out with application requirements from Appendix IV]"},{"page":73,"startToken":27250,"endToken":27519,"text":"Appendix B  \nData Form, Pre-System Impact \n \nDATA FORM TO BE PROVIDED BY THE LARGE LOAD IS APPLICANT \nPRIOR TO COMMENCEMENT OF THE LARGE LOAD SYSTEM IMPACT STUDY \nLarge Load Facility size (MW):  \n \nProvide two (2) copies of this completed form and other required plans and diagrams in accordance \nwith Section 1.2 of the Large Load Interconnection Process. \nProvide location plan and one-line diagram of the plant and station facilities. For staged projects, \nplease indicate future facility plans, transmission circuits, etc. \nOne set of metering is required for each generation connection to the new bus or existing CAISO \nControlled Grid station. Number of grid connections:  \n \nOn the one line indicate the demand attached at each metering location. (Maximum load on CT/PT) \nOn the one-line indicate the location of auxiliary power. (Minimum load on CT/PT) \nWill an alternate source of auxiliary power be available during CT/PT maintenance?  Yes  No \nWill a transfer bus on the generation side of the metering require that each meter set be designed \nfor the total plant load? \nYes \nNo \n(Please indicate on one-line). \nWhat type of control system or PLC will be located at the Large Load Interconnection Customer’s \nLarge Load Facility? \n \n \n \n \n \nWhat protocol does the control system or PLC use? \n \n \n \n \n \nPlease provide a 7.5-minute quadrangle of the site. Sketch the facility, station, transmission line, \nand property line. \nPhysical dimensions of the proposed interconnection station: \nBus length from load to interconnection station: \nLine length from interconnection station to the Participating TO’s transmission line. \nTower number observed in the field. (Painted on tower leg)*: \nNumber of third-party easements required for transmission lines*:"},{"page":74,"startToken":27519,"endToken":27606,"text":"* To be completed in coordination with the Participating TO or the CAISO. \nLocal service provider for auxiliary and other power:  \n \nPlease provide proposed schedule dates: \nEnvironmental survey start:  \n \nEnvironmental impact report submittal:  \n \nProcurement of project equipment:  \n \nBegin Construction Date:  \n \nIn-Service Date:  \n \nTrial Operation Date:  \n \nCommercial Operation Date:  \n \nRequested Level of Interconnection Service: Choose one of the following: \n \n Firm Service Only \n \n Flexible Interim Load Interconnection (FILI) Service, as applicable \nPlease provide any additional modification request pursuant to Section 1.4.2 of Appendix IV of \nthe DCRT Tariff."},{"page":75,"startToken":27606,"endToken":27627,"text":"Appendix IV \nAttachment 2  \nLarge Load Facilities Study Agreement \nfor Interconnection Requests Processed under the Large Load Interconnection Process and \nTimeline"},{"page":76,"startToken":27627,"endToken":27981,"text":"2 \n \nAttachment 2  \nto the DCRT Large Load Interconnection Process and Timeline  \nDCRT TO Tariff, Appendix IV \nLARGE LOAD FACILITIES STUDY AGREEMENT AND DATA FORM TO BE \nPROVIDED BY THE LARGE LOAD INTERCONNECTION STUDY APPLICANT \nPRIOR TO COMMENCEMENT OF THE INTERCONNECTION FACILITIES STUDY \n[LARGE LOAD INTERCONNECTION CUSTOMER] \nAND \nDCR TRANSMISSION, L.L.C. \nTHIS AGREEMENT is made and entered into this day of ___________, 20__ by and \nbetween ___________, a ___________ organized and existing under the laws of the \nState/Commonwealth of___________, (“Large Load Interconnection Customer”) and DCR \nTransmission, L.L.C., a limited liability company, organized and existing under the laws of the \nState of Delaware, (“DCRT”, or “Participating TO”). The Large Load Interconnection Customer \nand DCRT each may be referred to as a “Party,” or collectively as the “Parties.”  \nRECITALS \nWHEREAS, Large Load Interconnection Customer is proposing to develop a Large Load \nFacility or Large Load Facility expansion to an existing Large Load Facility consistent with the \nLarge Load Interconnection Application submitted by the Large Load Interconnection Customer \ndated   \n; and \nWHEREAS, the Large Load Interconnection Customer desires to interconnect the Large \nLoad Facility with the CAISO Controlled Grid pursuant to the Large Load Interconnection \nProcess; and \nWHEREAS, the Large Load Interconnection Customer has requested DCRT to conduct or \ncause to be performed a Large Load Facilities Study to specify and estimate the cost of the \nequipment, engineering, procurement and construction work needed on the Participating TO’s \nelectric system in accordance with Good Utility Practice to physically and electrically connect the \nLarge Load Facility to the CAISO Controlled Grid; \nNOW, THEREFORE, in consideration of and subject to the mutual covenants contained \nherein the Parties agree as follows: \n1.0 \nWhen used in this Agreement, with initial capitalization, the terms specified shall \nhave the meanings indicated in DCRT’s Federal Energy Regulatory Commission (“FERC”)-\napproved Large Load Interconnection Process in DCRT Tariff, Appendix IV thereto, or the Master \nDefinitions Supplement, Appendix A to the CAISO Tariff, as applicable. \n2.0 \nThe Large Load Interconnection Customer elects and DCRT shall conduct or cause \nto be performed a Large Load Facilities Study in accordance with the DCRT Tariff, Appendix IV."},{"page":77,"startToken":27981,"endToken":28509,"text":"3 \n \n3.0 \nThe scope of the Large Load Facilities Study will be subject to the assumptions set \nforth in and the data provided with this Agreement. \n4.0 \nThe Large Load Facilities Study Report: (i) will provide a description, estimated \ncost of (consistent with Attachment A), schedule for required facilities to interconnect the Large \nLoad Facility to the CAISO Controlled Grid; (ii) will address the issues identified in the voltage, \nshort circuit, stability, and power flow studied conducted as a part of the Large Load System \nImpact Study; and (iii) will reflect the evaluation of alternative transmission technologies in \naccordance with Section 2.4 of the DCRT Tariff, Appendix IV, including, if traditional Network \nUpgrades are selected instead of alternative transmission technologies, an explanation of why \nalternative transmission technologies are not feasible or would not result in lower costs or a faster \ntimeline. \n5.0 \nLarge Load Interconnection Customer will provide a Large Load Facilities Study \nfee for the performance of the Large Load Facilities Study in accordance with the provisions of \nSection 2.3.2 of the Large Load Interconnection Process. The time for completion of the Large \nLoad Facilities Study is specified in the Large Load Interconnection Process in DCRT Tariff, \nAppendix IV. \n6.0 \nMiscellaneous. \n6.1 \nDispute Resolution. Any dispute, or assertion of a claim, arising out of or in \nconnection with this Agreement, shall be resolved in accordance with Section 13.10 of the DCRT \nTariff. \n6.2 \nConfidentiality. Confidential Information shall be treated in accordance with \nSection 13.3 of the DCRT Tariff. \n6.3 \nBinding Effect. This Agreement and the rights and obligations hereof, shall be \nbinding upon and shall inure to the benefit of the successors and assigns of the Parties hereto. \n6.4 \nConflicts. In the event of a conflict between the body of this Agreement and any \nattachment, appendices or exhibits hereto, the terms and provisions of the body of this Agreement \nshall prevail and be deemed the final intent of the Parties. \n6.5 \nRules of Interpretation. This Agreement, unless a clear contrary intention appears, \nshall be construed and interpreted as follows: (1) the singular number includes the plural number \nand vice versa; (2) reference to any person includes such person’s successors and assigns but, in \nthe case of a Party, only if such successors and assigns are permitted by this Agreement, and \nreference to a person in a particular capacity excludes such person in any other capacity or \nindividually; (3) reference to any agreement (including this Agreement), document, instrument \nor tariff means such agreement, document, instrument, or tariff as amended or modified and in \neffect from time to time in accordance with the terms thereof and, if applicable, the terms hereof; \n(4) reference to any applicable laws and regulations means such applicable laws and regulations \nas amended, modified, codified, or reenacted, in whole or in part, and in effect from time to time, \nincluding, if applicable, rules and regulations promulgated thereunder; (5) unless expressly stated \notherwise, reference to any Article, Section or Appendix means such Article or Section of this \nAgreement or such Appendix to this Agreement, as the case may be; (6) “hereunder”, “hereof”,"},{"page":78,"startToken":28509,"endToken":29034,"text":"4 \n \n“herein”, “hereto” and words of similar import shall be deemed references to this Agreement as \na whole and not to any particular Article, Section, or other provision hereof or thereof; (7) \n“including” (and with correlative meaning “include”) means including without limiting the \ngenerality of any description preceding such term; and (8) relative to the determination of any \nperiod of time, “from” means “from and including”, “to” means “to but excluding” and “through” \nmeans “through and including”. \n6.6 \nEntire Agreement. This Agreement, including all Appendices and Schedules \nattached hereto, constitutes the entire agreement between the Parties with reference to the subject \nmatter hereof, and supersedes all prior and contemporaneous understandings or agreements, oral \nor written, between the Parties with respect to the subject matter of this Agreement. There are no \nother agreements, representations, warranties, or covenants which constitute any part of the \nconsideration for, or any condition to, any Party’s compliance with its obligations under this \nAgreement. \n6.7 \nNo Third-Party Beneficiaries. This Agreement is not intended to and does not create \nrights, remedies, or benefits of any character whatsoever in favor of any persons, corporations, \nassociations, or entities other than the Parties, and the obligations herein assumed are solely for \nthe use and benefit of the Parties, their successors in interest and, where permitted, their assigns. \n6.8 \nWaiver. The failure of a Party to this Agreement to insist, on any occasion, upon \nstrict performance of any provision of this Agreement will not be considered a waiver of any \nobligation, right, or duty of, or imposed upon, such Party. \nAny waiver at any time by either Party of its rights with respect to this Agreement shall not be \ndeemed a continuing waiver or a waiver with respect to any other failure to comply with any other \nobligation, right, duty of this Agreement. Termination or default of this Agreement for any reason \nby the Large Load Interconnection Customer shall not constitute a waiver of the Large Load \nInterconnection Customer’s legal rights to obtain an interconnection from the Participating TO. \nAny waiver of this Agreement shall, if requested, be provided in writing. \nAny waivers at any time by any Party of its rights with respect to any default under this Agreement, \nor with respect to any other matter arising in connection with this Agreement, shall not constitute \nor be deemed a waiver with respect to any subsequent default or other matter arising in connection \nwith this Agreement. Any delay, short of the statutory period of limitations, in asserting or \nenforcing any right under this Agreement shall not constitute or be deemed a waiver of such right. \n6.9 \nHeadings. The descriptive headings of the various Articles and Sections of this \nAgreement have been inserted for convenience of reference only and are of no significance in the \ninterpretation or construction of this Agreement. \n6.10 \nMultiple Counterparts. This Agreement may be executed in two (2) or more \ncounterparts, each of which is deemed an original but all constitute one and the same instrument. \n6.11 \nAmendment. The Parties may by mutual agreement amend this Agreement by a \nwritten instrument duly executed by both of the Parties."},{"page":79,"startToken":29034,"endToken":29573,"text":"5 \n \n6.12 \nModification by the Parties. The Parties may by mutual agreement amend the \nAppendices to this Agreement by a written instrument duly executed by both of the Parties. Such \namendment shall become effective and a part of this Agreement upon satisfaction of all applicable \nlaws and regulations. \n6.13 \nReservation of Rights. DCRT shall have the right to make a unilateral filing with \nFERC to modify this Agreement with respect to any rates, terms and conditions, charges, \nclassifications of service, rule or regulation under section 205 or any other applicable provision of \nthe Federal Power Act and FERC’s rules and regulations thereunder, and Large Load \nInterconnection Customer shall have the right to make a unilateral filing with FERC to modify this \nAgreement pursuant to section 206 or any other applicable provision of the Federal Power Act and \nFERC’s rules and regulations thereunder; provided that each Party shall have the right to protest \nany such filing by another Party and to participate fully in any proceeding before FERC in which \nsuch modifications may be considered. Nothing in this Agreement shall limit the rights of the \nParties or of FERC under sections 205 or 206 of the Federal Power Act and FERC’s rules and \nregulations thereunder, except to the extent that the Parties otherwise mutually agree as provided \nherein. \n6.14 \nNo Partnership. This Agreement shall not be interpreted or construed to create an \nassociation, joint venture, agency relationship, or partnership between the Parties or to impose any \npartnership obligation or partnership liability upon any Party. No Party shall have any right, power \nor authority to enter into any agreement or undertaking for, or act on behalf of, or to act as or be \nan agent or representative of, or to otherwise bind, another Party. \n6.15 \nAssignment. This Agreement may be assigned by a Party only with the written \nconsent of the other Party; provided that a Party may assign this Agreement without the consent \nof the other Party to any Affiliate of the assigning Party with an equal or greater credit rating and \nwith the legal authority and operational ability to satisfy the obligations of the assigning Party \nunder this Agreement; and provided further that the Large Load Interconnection Customer shall \nhave the right to assign this Agreement, without the consent of the other Party, for collateral \nsecurity purposes to aid in providing financing for the Large Load Facility, provided that the Large \nLoad Interconnection Customer will require any secured party, trustee or mortgagee to notify the \nother Party of any such assignment. Any financing arrangement entered into by the Large Load \nInterconnection Customer pursuant to this Section will provide that prior to or upon the exercise \nof the secured party’s, trustee’s or mortgagee’s assignment rights pursuant to said arrangement, \nthe secured creditor, the trustee or mortgagee will notify the other Party of the date and particulars \nof any such exercise of assignment right(s). Any attempted assignment that violates this Section is \nvoid and ineffective. Any assignment under this Agreement shall not relieve a Party of its \nobligations, nor shall a Party’s obligations be enlarged, in whole or in part, by reason thereof. \nWhere required, consent to assignment will not be unreasonably withheld, conditioned or delayed."},{"page":80,"startToken":29573,"endToken":29617,"text":"6 \n \nIN WITNESS WHEREOF, the Parties have caused this Agreement to be duly executed by their \nduly authorized officers or agents on the day and year first above written. \nDCR Transmission, L.L.C. \nBy: \n \n \nTitle:  \n \nDate:  \n \nLarge Load Interconnection Customer \nBy: \n \n \nTitle:  \n \nDate:"},{"page":81,"startToken":29617,"endToken":29637,"text":"Appendix IV \nAttachment 3  \nLarge Load Interconnection Agreement \nfor Interconnection Requests Processed under the Large Load Interconnection Process and \nTimeline"},{"page":82,"startToken":29637,"endToken":29865,"text":"i \nTABLE OF CONTENTS \n \nPage \nARTICLE 1. DEFINITIONS ........................................................................................................2 \nARTICLE 2. EFFECTIVE DATE, TERM AND TERMINATION .........................................8 \n2.1 \nEffective Date ......................................................................................................................8 \n2.2 \nTerm of Agreement ..............................................................................................................8 \n2.3 \nTermination Procedures .......................................................................................................8 \n2.3.1 \nWritten Notice ....................................................................................................8 \n2.3.2 \nDefault................................................................................................................8 \n2.3.3 \nSuspension of Work ...........................................................................................8 \n2.4 \nTermination Costs ................................................................................................................8 \n2.5 \nDisconnection ....................................................................................................................10 \n2.6 \nSurvival ..............................................................................................................................10 \nARTICLE 3. REGULATORY FILINGS AND CAISO TARIFF COMPLIANCE ..............10 \n3.1 \nFiling ..................................................................................................................................10 \n3.2 \nAgreement Subject to CAISO Tariff .................................................................................10 \nARTICLE 4. SCOPE OF SERVICE ..........................................................................................10 \n4.1 \nLarge Load Interconnection Service ..................................................................................10 \n4.2 \nProvision of Service ...........................................................................................................11 \n4.3 \nPerformance Standards ......................................................................................................11 \n4.4 \nNo Transmission Service ...................................................................................................11 \nARTICLE 5. LARGE LOAD INTERCONNECT CUSTOMER’S INTERCONNECTION \nFACILITIES ENGINEERING, PROCUREMENT, AND CONSTRUCTION ....................11 \n5.1 \nDesign Requirements. ........................................................................................................11 \n5.1.1 \nStandard Option ...............................................................................................11 \n5.2 \nLiquidated Damages ..........................................................................................................12 \n5.3 \nReserved .............................................................................................................................12 \n5.4 \nEquipment Procurement.....................................................................................................13 \n5.5 \nConstruction Commencement ............................................................................................13 \n5.6 \nWork Progress ....................................................................................................................13 \n5.7 \nInformation Exchange ........................................................................................................13 \n5.8 \nLimited Operation ..............................................................................................................14 \n5.9 \nLarge Load Interconnection Customer’s Interconnection Facilities ..................................14 \n5.9.1 \nLarge Load Facility and Large Load Interconnection Customer’s \nInterconnection Facilities Specifications .........................................................14 \n5.9.2 \nParticipating TO’s Review ...............................................................................14 \n5.9.3 \nLarge Load Interconnection Customer’s Interconnection Facilities \nConstruction .....................................................................................................15 \n5.10 \nParticipating TO’s Interconnection Facilities Construction ..............................................15 \n5.11 \nAccess Rights .....................................................................................................................15"},{"page":83,"startToken":29865,"endToken":30165,"text":"ii \n5.12 \nLands of Other Property Owners .......................................................................................16 \n5.13 \nPermits ...............................................................................................................................16 \n5.14 \nSuspension .........................................................................................................................16 \n5.15 \nTaxes ..................................................................................................................................16 \n5.15.1 \nLarge Load Interconnection Customer Payments Not Taxable .......................16 \n5.15.2 \nRepresentations And Covenants ......................................................................17 \n5.15.3 \nIndemnification for the Cost Consequence of Current Tax Liability Imposed \nUpon the Participating TO ...............................................................................17 \n5.15.4 \nTax Gross-Up Amount .....................................................................................18 \n5.15.5 \nPrivate Letter Ruling or Change or Clarification of Law ................................18 \n5.15.6 \nSubsequent Taxable Events .............................................................................19 \n5.15.7 \nContests ............................................................................................................19 \n5.15.8 \nRefund ..............................................................................................................20 \n5.15.9 \nTaxes Other Than Income Taxes .....................................................................21 \n5.16 \nTax Status...........................................................................................................................22 \nARTICLE 6. LARGE LOAD INTERCONNECTION TESTING AND INSPECTION ......22 \n6.1 \nPre-Commercial Operation Date Testing and Modifications ............................................22 \n6.2 \nPost-Commercial Operation Date Testing and Modifications ...........................................22 \n6.3 \nRight to Observe Testing ...................................................................................................22 \n6.4 \nRight to Inspect ..................................................................................................................22 \nARTICLE 7. METERING ..........................................................................................................23 \n7.1 \nGeneral ...............................................................................................................................23 \n7.2 \nCheck Meters .....................................................................................................................23 \n7.3 \nParticipating TO Retail Metering.......................................................................................23 \nARTICLE 8. COMMUNICATIONS .........................................................................................23 \n8.1 \nLarge Load Interconnection Customer Obligations ...........................................................23 \n8.2 \nRemote Terminal Unit .......................................................................................................24 \n8.3 \nNo Annexation ...................................................................................................................24 \nARTICLE 9. LARGE LOAD INTERCONNECTION CUSTOMER OPERATIONS .........24 \n9.1 \nGeneral ...............................................................................................................................24 \n9.2 \nParticipating TO Obligations .............................................................................................24 \n9.3 \nLarge Load Interconnection Customer Obligations ...........................................................24 \n9.4 \nReactive Power and Primary Frequency Response ...........................................................25 \n9.5 \nDisconnection from the Grid .............................................................................................25 \n9.6 \nOutages and Interruptions ..................................................................................................25 \n9.6.1 \nOutages ............................................................................................................25 \n9.6.1.1 \nOutage Authority and Coordination.....................................................25 \n9.6.1.2 \nOutage Schedules .................................................................................25 \n9.6.1.3 \nOutage Restoration...............................................................................25 \n9.6.2 \nInterruption of Service .....................................................................................26 \n9.6.3 \nUnder-Frequency and Over-Frequency Conditions .........................................26 \n9.6.4 \nSystem Protection and Other Control Requirements .......................................27 \n9.6.4.1 \nSystem Protection Facilities .................................................................27"},{"page":84,"startToken":30165,"endToken":30440,"text":"iii \n9.6.5 \nRequirements for Protection ............................................................................28 \n9.6.6 \nPower Quality ..................................................................................................28 \n9.7 \nSwitching and Tagging Rules ............................................................................................28 \n9.8 \nUse of Interconnection Facilities by Third Parties ............................................................29 \n9.8.1 \nPurpose of Interconnection Facilities...............................................................29 \n9.8.2 \nThird Party Users .............................................................................................29 \n9.9 \nDisturbance Analysis Data Exchange ................................................................................29 \nARTICLE 10. MAINTENANCE ................................................................................................29 \n10.1 \nParticipating TO Obligations .............................................................................................29 \n10.2 \nLarge Load Interconnection Customer Obligations ...........................................................29 \n10.3 \nCoordination ......................................................................................................................30 \n10.4 \nSecondary Systems ............................................................................................................30 \n10.5 \nOperating and Maintenance Expenses ...............................................................................30 \nARTICLE 11. PERFORMANCE OBLIGATION ...................................................................30 \n11.1 \nLarge Load Interconnection Customer’s Interconnection Facilities ..................................30 \n11.2 \nParticipating TO’s Interconnection Facilities ....................................................................30 \n11.3 \nNetwork Upgrades and Distribution Upgrades ..................................................................30 \n11.3.1 \nReimbursement for Network Upgrades. ..........................................................31 \n11.3.2 \nRepayment of Amounts Advanced for Network Upgrades .............................31 \n11.3.2.1 \nRepayment Schedule ............................................................................31 \n11.3.2.2 \nInterest Payments and Assignment Rights ...........................................31 \n11.3.2.3 \nFailure to Achieve Commercial Operation ..........................................32 \n11.3.2.4 \nAccelerated Reimbursement Against Reimbursement Security ..........32 \n11.3.3 \nSpecial Provisions for Affected Systems .........................................................33 \n11.4 \nProvision of Interconnection Financial Security. ...............................................................34 \nARTICLE 12. INVOICE .............................................................................................................34 \n12.1 \nGeneral ...............................................................................................................................34 \n12.2 \nFinal Invoice ......................................................................................................................34 \n12.3 \nPayment..............................................................................................................................35 \n12.4 \nDisputes..............................................................................................................................35 \nARTICLE 13. EMERGENCIES ................................................................................................36 \n13.1 \n[Reserved] ..........................................................................................................................36 \n13.2 \nObligations .........................................................................................................................36 \n13.3 \nNotice .................................................................................................................................36 \n13.4 \nImmediate Action...............................................................................................................36 \n13.5 \nParticipating TO Authority ................................................................................................36 \n13.5.1 \nGeneral .............................................................................................................36 \n13.5.2 \nReduction and Disconnection ..........................................................................37 \n13.6 \nLarge Load Interconnection Customer Authority ..............................................................37 \n13.7 \nLimited Liability ................................................................................................................37 \nARTICLE 14. REGULATORY REQUIREMENTS AND GOVERNING LAWS ...............37 \n14.1 \nRegulatory Requirements...................................................................................................37"},{"page":85,"startToken":30440,"endToken":30664,"text":"iv \n14.2 \nGoverning Law ..................................................................................................................38 \nARTICLE 15. NOTICES ............................................................................................................38 \n15.1 \nGeneral ...............................................................................................................................38 \n15.2 \nBillings and Payments........................................................................................................38 \n15.3 \nAlternative Forms of Notice ..............................................................................................38 \n15.4 \nOperations and Maintenance Notice ..................................................................................38 \nARTICLE 16. FORCE MAJEURE............................................................................................39 \n16.1 \nForce Majeure ....................................................................................................................39 \nARTICLE 17. DEFAULT ...........................................................................................................39 \n17.1 \nDefault................................................................................................................................39 \n17.1.1 \nGeneral .............................................................................................................39 \n17.1.2 \nRight to Terminate ...........................................................................................39 \nARTICLE 18. INDEMNITY, CONSEQUENTIAL DAMAGES, AND INSURANCE ........40 \n18.1 \nIndemnity ...........................................................................................................................40 \n18.1.1 \nIndemnified Party.............................................................................................40 \n18.1.2 \nIndemnifying Party ..........................................................................................40 \n18.1.3 \nIndemnity Procedures ......................................................................................40 \n18.2 \nConsequential Damages .....................................................................................................41 \n18.3 \nInsurance ............................................................................................................................41 \n18.3.1 \nWorkers’ Compensation Insurance and Employers’ Liability .........................41 \n18.3.2 \nCommercial General Liability Insurance .........................................................41 \n18.3.3 \nBusiness Automobile Liability Insurance ........................................................42 \n18.3.4 \nExcess Liability Insurance ...............................................................................42 \n18.3.8 \n[Not Used.] .......................................................................................................43 \nARTICLE 19. ASSIGNMENT ...................................................................................................44 \n19.1 \nAssignment ........................................................................................................................44 \nARTICLE 20. SEVERABILITY ................................................................................................44 \n20.1 \nSeverability ........................................................................................................................44 \nARTICLE 21. COMPARABILITY ...........................................................................................44 \n21.1 \nComparability ....................................................................................................................44 \nARTICLE 22. CONFIDENTIALITY ........................................................................................45 \n22.1 \nConfidentiality ...................................................................................................................45 \n22.1.1 \nTerm .................................................................................................................45 \n22.1.2 \nScope ................................................................................................................45 \n22.1.3 \nRelease of Confidential Information ................................................................45 \n22.1.4 \nRights ...............................................................................................................46 \n22.1.5 \nNo Warranties ..................................................................................................46 \n22.1.6 \nStandard of Care ..............................................................................................46 \n22.1.7 \nOrder of Disclosure ..........................................................................................46 \n22.1.8 \nTermination of Agreement ...............................................................................46"},{"page":86,"startToken":30664,"endToken":30897,"text":"v \n22.1.9 \nRemedies ..........................................................................................................46 \n22.1.10 \nDisclosure to FERC, its Staff, or a State ..........................................................47 \nARTICLE 23. ENVIRONMENTAL RELEASES ....................................................................48 \nARTICLE 24. INFORMATION REQUIREMENTS ...............................................................48 \n24.1 \nInformation Acquisition .....................................................................................................48 \n24.2 \nInformation Submission by Participating TO ....................................................................48 \nARTICLE 25. INFORMATION ACCESS AND AUDIT RIGHTS ........................................48 \n25.1 \nInformation Access ............................................................................................................48 \n25.2 \nReporting of Non-Force Majeure Events ...........................................................................49 \n25.3 \nAudit Rights .......................................................................................................................49 \n25.4 \nAudit Rights Periods ..........................................................................................................49 \n25.4.1 \nAudit Rights Period for Construction-Related Accounts and Records ............49 \n25.4.2 \nAudit Rights Period for All Other Accounts and Records ...............................49 \n25.5 \nAudit Results ......................................................................................................................50 \nARTICLE 26. SUBCONTRACTORS .......................................................................................50 \n26.1 \nGeneral ...............................................................................................................................50 \n26.2 \nResponsibility of Principal .................................................................................................50 \n26.3 \nNo Limitation by Insurance ...............................................................................................50 \nARTICLE 27. DISPUTES ...........................................................................................................50 \n27.1 \nSubmission .........................................................................................................................50 \n27.2 \nExternal Arbitration Procedures ........................................................................................51 \n27.3 \nArbitration Decisions .........................................................................................................51 \n27.4 \nCosts ...................................................................................................................................51 \nARTICLE 28. REPRESENTATIONS, WARRANTIES AND COVENANTS ......................51 \n28.1 \nGeneral ...............................................................................................................................51 \n28.1.1 \nGood Standing .................................................................................................51 \n28.1.2 \nAuthority ..........................................................................................................52 \n28.1.3 \nNo Conflict.......................................................................................................52 \n28.1.4 \nConsent and Approval......................................................................................52 \nARTICLE 29. [RESERVED] ......................................................................................................52 \nARTICLE 30. MISCELLANEOUS ...........................................................................................52 \n30.1 \nBinding Effect ....................................................................................................................52 \n30.2 \nConflicts .............................................................................................................................52 \n30.3 \nRules of Interpretation .......................................................................................................52 \n30.4 \nEntire Agreement ...............................................................................................................53 \n30.5 \nNo Third-Party Beneficiaries .............................................................................................53 \n30.6 \nWaiver ................................................................................................................................53 \n30.7 \nHeadings ............................................................................................................................53 \n30.8 \nMultiple Counterparts ........................................................................................................53 \n30.9 \nAmendment ........................................................................................................................53"},{"page":87,"startToken":30897,"endToken":30982,"text":"vi \n30.10 Modification by the Parties ................................................................................................53 \n30.11 Reservation of Rights .........................................................................................................54 \n30.12 No Partnership ...................................................................................................................54 \n30.13 Joint and Several Obligations ............................................................................................54 \n \nAppendices \nAppendix A Interconnection Facilities, Network Upgrades and Distribution Upgrades \nAppendix B Milestones \nAppendix C Interconnection Details \nAppendix D Security Arrangements Details \nAppendix E Commercial Operation Date \nAppendix F Addresses for Delivery of Notices and Billings \nAppendix G Large Load Interconnection Customer’s Share of Costs of Network Upgrades \nfor Applicable Project Group \nAppendix H Co-Location and Behind-the-Meter Generation Provisions"},{"page":88,"startToken":30982,"endToken":31291,"text":"1 \nAttachment 3  \nto the DCRT Large Load Interconnection Process and Timeline  \nDCRT TO Tariff, Appendix IV \nLARGE LOAD INTERCONNECTION AGREEMENT \n[LARGE LOAD INTERCONNECTION CUSTOMER] \nAND \nDCR TRANSMISSION, L.L.C. \nTHIS LARGE LOAD INTERCONNECTION AGREEMENT (“LLIA”) is made and \nentered into this ______ day of ________________ 20___, by and among _________________, \na ________________, organized and existing under the laws of the State/Commonwealth of \n___________ (“Large Load Interconnection Customer” with a Large Load Facility), and DCR \nTransmission, L.L.C., a limited liability company, organized and existing under the laws of the \nState of Delaware (“DCRT” or “Participating TO”). Large Load Interconnection Customer, and \nParticipating TO each may be referred to as a “Party” or collectively as the “Parties.”1 \nRECITALS \nWHEREAS, the California Independent System Operator Corporation (“CAISO”) \nexercises Operational Control over the CAISO Controlled Grid; and \nWHEREAS, the Participating TO owns, operates, and maintains the Participating TO’s \nTransmission System; and \nWHEREAS, Large Load Interconnection Customer intends to own, lease and/or control \nand operate the Large Load Facility identified as a Large Load Facility in Appendices A and C to \nthis LLIA; and \nWHEREAS, Large Load Interconnection Customer, Participating TO, and, as applicable, \nCAISO have agreed to enter into this LLIA for the purpose of interconnecting the Large Load \nFacility with the Participating TO’s Transmission System; and  \nWHEREAS, to the extent applicable, Appendix H sets forth the applicable provisions \nrelating to impacts (financial, operational, regulatory and otherwise) on the Large Load \nInterconnection Customer arising out of or related to co-located or Behind-the-Meter Generation \nutilizing the Large Load Interconnection Customer’s Interconnection Facilities that may \nnecessitate CAISO becoming a signatory to this LLIA;   \nNOW, THEREFORE, in consideration of and subject to the mutual covenants contained \nherein, it is agreed: \n \n1 The California Independent System Operator Corporation will be added as a party to this LLIA as may be required \npursuant to Appendix H."},{"page":89,"startToken":31291,"endToken":31662,"text":"2 \nWhen used in this LLIA, terms with initial capitalization that are not defined in Article 1 \nshall have the meanings specified in the Article in which they are used.  Further, terms with \ninitial capitalization which are used but not defined in the LLIA shall have the meaning given \nthem in the Appendices. \nArticle 1. Definitions \n1.1 \nCapitalized terms used herein that are not defined in this Article 1 are defined in the \nParticipating TO Tariff.  \nAccess Party shall have the meaning set forth in Article 5.11. \nAffected System shall mean an electric system other than the Participating Transmission \nOwners Transmission System that may be affected by the proposed interconnection. \nAffiliate shall mean, with respect to a corporation, partnership or other entity, each such \nother corporation, partnership or other entity that directly or indirectly, through one or more \nintermediaries, controls, is controlled by, or is under common control with, such corporation, \npartnership or other entity. \nAlternative Transmission Technologies shall mean any transmission technology other \nthan Network Upgrades that can be used to improve the Participating TO’s Transmission System \nto interconnect an Interconnection Customer or Large Load Interconnection Customer, which \nmay include static synchronous compensators, static VAR compensators, advanced power flow \ncontrol devices, transmission switching, synchronous condensers, voltage source converters, \nadvanced conductors, and tower lifting.  \nApplicable Laws and Regulations shall mean all duly promulgated applicable federal, \nstate and local laws, regulations, rules, ordinances, codes, decrees, judgments, directives, or \njudicial or administrative orders, permits and other duly authorized actions of any Governmental \nAuthority. \nApplicable Reliability Council shall mean the Western Electricity Coordinating Council \nor its successor. \nApplicable Reliability Standards shall mean the requirements and guidelines of NERC, \nthe Applicable Reliability Council, and the Balancing Authority Area of the Participating TO’s \nTransmission System to which the Large Load Facility is directly connected, including \nrequirements adopted pursuant to section 215 of the Federal Power Act. \nBalancing Authority shall mean the responsible entity that integrates resource plans \nahead of time, maintains load-interchange-generation balance within a Balancing Authority \nArea, and supports Interconnection frequency in real time. \nBalancing Authority Area shall mean the collection of generation, transmission, and \nloads within the metered boundaries of the Balancing Authority. The Balancing Authority \nmaintains load-resource balance within this area."},{"page":90,"startToken":31662,"endToken":32093,"text":"3 \nBehind-the-Meter Generation shall mean generating facility that delivers energy to load \nwithout using the transmission system or any distribution facilities. \nBreach shall mean the failure of a Party to perform or observe any material term or \ncondition of this LLIA. \nBreaching Party shall mean a Party that is in Breach of this LLIA. \nBusiness Day shall mean Monday through Friday, excluding federal holidays and the day \nafter Thanksgiving Day. \nCAISO Controlled Grid shall mean the system of transmission lines and associated \nfacilities of the parties to the Transmission Control Agreement that have been placed under the \nCAISO’s Operational Control. \nCAISO Tariff shall mean the CAISO’s tariff, as filed with FERC, and as amended or \nsupplemented from time to time, or any successor tariff. \nCalendar Day shall mean any day including Saturday, Sunday or a federal holiday. \nCo-located Facilities shall mean both the load and generation facilities in a configuration \nwhere end-use customer load is physically connected to the facilities of an existing or planned \ngenerating facility on the generator interconnection customer’s side of the point of \ninterconnection to the Participating TO’s Transmission System.  \nCommercial Operation shall mean the status of a (i) Large Load Facility or project \nphase at a Large Load Facility that has commenced demand for electricity, excluding electricity \nused during the construction of the Large Load Facility or (ii) Network Upgrade, when such \nupgrade is fully and finally constructed and can fully operate as intended. \nCommercial Operation Date of a Large Load Facility or project phase shall mean the \ndate on which the Large Load Facility or project phase at the Large Load Facility commences \nCommercial Operation as agreed to by the applicable Participating TO, as applicable, the \nCAISO, and the Large Load Interconnection Customer pursuant to Appendices E and H to this \nLLIA, and in accordance with any implementation plan agreed to by the Participating TO and the \nCAISO for multiple individual Large Load Facilities or project phases at a Large Load Facility \nwhere a Large Load Interconnection Customer intends to establish separate Commercial \nOperation Dates for those Large Load Facilities or project phases. \nConfidential Information shall mean any confidential, proprietary or trade secret \ninformation of a plan, specification, pattern, procedure, design, device, list, concept, policy or \ncompilation relating to the present or planned business of a Party, which is designated as \nconfidential by the Party supplying the information, whether conveyed orally, electronically, in \nwriting, through inspection, or otherwise, subject to Article 22.1.2. \nDefault shall mean the failure of a Breaching Party to cure its Breach in accordance with \nArticle 17 of this LLIA."},{"page":91,"startToken":32093,"endToken":32557,"text":"4 \nDistribution System shall mean those non-CAISO-controlled transmission and \ndistribution facilities owned by the Participating TO. \nDistribution Upgrades shall mean the additions, modifications, and upgrades to the \nParticipating TO’s Distribution System. Distribution Upgrades do not include Interconnection \nFacilities. \nEffective Date shall mean the date on which this LLIA becomes effective upon \nexecution by all Parties subject to acceptance by FERC, or if filed unexecuted, upon the date \nspecified by FERC. \nEmergency Condition shall mean a condition or situation, that in the judgment of the \nParty making the claim, is imminently likely: (1) to endanger life or property; (2) is imminently \nlikely to cause a material adverse effect on the security of, or damage to, the Participating TO’s \nTransmission System, Participating TO’s Interconnection Facilities, Distribution System, or the \nelectric systems of others to which the Participating TO’s electric system is directly connected; \nor (3) to cause a material adverse effect on the security of, or damage to, the Large Load Facility \nor Large Load Interconnection Customer’s Interconnection Facilities.   \nEnvironmental Law shall mean Applicable Laws and Regulations relating to pollution \nor protection of the environment or natural resources. \nFederal Power Act shall mean the Federal Power Act, as amended, 16 U.S.C. §§ 791a et \nseq. \nFERC shall mean the Federal Energy Regulatory Commission or its successor. \nFlexible Interim Load Interconnection Service (FILI) shall mean the interim \ninterconnection service that the Participating TO may offer pursuant to Section 4.1 of the LLIP \nwhere the Large Load Facility cannot be reliably served at its full requested demand until certain \nNetwork Upgrades are completed, as further described in Section A-2 of Appendix A to this \nLLIA. \nForce Majeure shall mean any act of God, labor disturbance, act of the public enemy, \nwar, insurrection, riot, fire, storm or flood, explosion, breakage or accident to machinery or \nequipment, any order, regulation or restriction imposed by governmental, military or lawfully \nestablished civilian authorities, or any other cause beyond a Party’s control. A Force Majeure \nevent does not include acts of negligence or intentional wrongdoing by the Party claiming Force \nMajeure. \nGood Utility Practice shall mean any of the practices, methods and acts engaged in or \napproved by a significant portion of the electric utility industry during the relevant time period, \nor any of the practices, methods and acts which, in the exercise of reasonable judgment in light \nof the facts known at the time the decision was made, could have been expected to accomplish \nthe desired result at a reasonable cost consistent with good business practices, reliability, safety \nand expedition. Good Utility Practice is not intended to be any one of a number of the optimum \npractices, methods, or acts to the exclusion of all others, but rather to be acceptable practices, \nmethods, or acts generally accepted in the region."},{"page":92,"startToken":32557,"endToken":32972,"text":"5 \nGovernmental Authority shall mean any federal, state, local or other governmental, \nregulatory or administrative agency, court, commission, department, board, or other \ngovernmental subdivision, legislature, rulemaking board, tribunal, or other governmental \nauthority having jurisdiction over the Parties, their respective facilities, or the respective services \nthey provide, and exercising or entitled to exercise any administrative, executive, police, or \ntaxing authority or power; provided, however, that such term does not include the Large Load \nInterconnection Customer, CAISO, Participating TO, or any Affiliate thereof. \nGranting Party shall have the meaning set forth in Article 5.11. \nHazardous Substances shall mean any chemicals, materials or substances defined as or \nincluded in the definition of “hazardous substances,” “hazardous wastes,” “hazardous materials,” \n“hazardous constituents,” “restricted hazardous materials,” “extremely hazardous substances,” \n“toxic substances,” “radioactive substances,” “contaminants,” “pollutants,” “toxic pollutants” or \nwords of similar meaning and regulatory effect under any applicable Environmental Law, or any \nother chemical, material or substance, exposure to which is prohibited, limited or regulated by \nany applicable Environmental Law. \nIn-Service Date shall mean the date upon which the Large Load Interconnection \nCustomer reasonably expects it will be ready to begin use of the Participating TO’s \nInterconnection Facilities to draw energy from the Participating Transmission Owner \nTransmission System. \nInterconnection Facilities shall mean the Participating TO’s Interconnection Facilities \nand the Large Load Interconnection Customer’s Interconnection Facilities. Collectively, \nInterconnection Facilities include all facilities and equipment between the Large Load Facility \nand the Point of Interconnection, including any modification, additions or upgrades that are \nnecessary to physically and electrically interconnect the Large Load Facility to the Participating \nTO’s Transmission System. Interconnection Facilities are sole use facilities and shall not include \nDistribution Upgrades, or Network Upgrades. \nInterconnection Financial Security (IFS) shall mean any of the financial instruments \nlisted in Attachment 4 to the LLIP that are posted by Large Load Interconnection Customer to \nfinance the construction of facilities or Network Upgrades. \nInterconnection Service shall mean the service provided by the Participating TO and, as \napplicable, CAISO associated with interconnecting the Large Load Interconnection Customer’s \nInterconnection Facilities to the Participating TO’s Transmission System and enabling the \nCAISO Controlled Grid to transmit electric energy and capacity from the  CAISO Controlled \nGrid to the Large Load Facility at the Point of Interconnection, pursuant to the terms of this \nLLIA, the Participating TO’s Transmission Owner Tariff, and, as applicable, the CAISO Tariff. \nIRS shall mean the Internal Revenue Service. \nLLIP means the process for studying load interconnection as set forth in Appendix IV of \nthe Participating TO Tariff."},{"page":93,"startToken":32972,"endToken":33385,"text":"6 \nLarge Load Facility means a facility whose Point(s) of Interconnection connect to the \nParticipating TO’s Transmission System and has a peak load of 50 megawatts (MW) or greater. \nLarge Load Facility Point of Change of Ownership shall mean the point, as set forth in \nAppendix A to this LLIA, where the Large Load Interconnection Customer’s Interconnection \nFacilities connect to the Participating TO’s Interconnection Facilities. \nLarge Load Interconnection Agreement (LLIA) shall have the meaning set forth in the \nPreamble. \nLarge Load Interconnection Application shall mean an application for interconnection, \nin the form of Section 1.4 to the LLIP. \nLarge Load Interconnection Customer shall have the meaning set forth in the \nPreamble. \nLarge Load Interconnection Customer’s Interconnection Facilities shall mean all \nfacilities and equipment, as identified in Appendix A of this LLIA, that are located between the \nLarge Load Facility and the Participating TO’s Interconnection Facilities, including any \nmodification, addition, or upgrades to such facilities and equipment necessary to physically and \nelectrically interconnect the Large Load Facility to the Participating TO’s Transmission System. \nLarge Load Interconnection Customer’s Interconnection Facilities are sole use facilities. \nLarge Load Interconnection Studies shall mean studies performed pursuant to \nAppendix IV of the Participating TO Tariff, including the Large Load System Impact Study and \nthe Large Load Facilities Study. \nLoss shall mean any and all damages, losses, and claims, including claims and actions \nrelating to injury to or death of any person or damage to property, demand, suits, recoveries, \ncosts and expenses, court costs, attorney fees, and all other obligations by or to third parties. \nMetering Equipment shall mean all metering equipment installed or to be installed for \nmeasuring the power flows to the Large Load Facility pursuant to this LLIA at the metering \npoints, including but not limited to instrument transformers, Megawatt-hour-meters, data \nacquisition equipment, transducers, remote terminal unit, communications equipment, phone \nlines, and fiber optics.   \nNERC shall mean the North American Electric Reliability Corporation or its successor \norganization. \nNetwork Upgrades shall be the mean the additions, modifications, and upgrades to the \nParticipating TO’s Transmission System at or beyond the Point of Interconnection, identified in \nthe Large Load Interconnection Studies, as identified in Appendix A and, as applicable \nAppendix H, to relieve constraints on the Participating TO’s Transmission System.  Alternative \nTransmission Technologies shall be included in the definition of Network Upgrades. \nOperational Control shall mean the rights of the CAISO under the Transmission \nControl Agreement and the CAISO Tariff to direct the parties to the Transmission Control"},{"page":94,"startToken":33385,"endToken":33830,"text":"7 \nAgreement how to operate their transmission lines and facilities and other electric plant affecting \nthe reliability of those lines and facilities for the purpose of affording comparable non-\ndiscriminatory transmission access and meeting applicable reliability criteria. \nParticipating TO’s Interconnection Facilities shall mean all facilities and equipment \nowned, controlled or operated by the Participating TO from the Large Load Facility Point of \nChange of Ownership to the Point of Interconnection as identified in Appendix A to this LLIA, \nincluding any modifications, additions or upgrades to such facilities and equipment. Participating \nTO’s Interconnection Facilities are sole use facilities and shall not include Distribution \nUpgrades, or Network Upgrades. \nParticipating TO’s Interconnection Handbook shall mean the Participating TO’s \nbusiness practice for prospective Large Load Interconnection Customers seeking interconnection \nunder the Large Load Interconnection Process described in Appendix IV to the Participating \nTO’s Tariff. \nParticipating TO’s Tariff shall mean the currently effective tariff of DCR Transmission, \nL.L.C., Transmission Owner Tariff on file with FERC, as may be amended or superseded from \ntime to time upon further filing with and acceptance by FERC.  \nParticipating TO’s Transmission System shall mean the facilities owned and operated \nby the Participating TO and that have been placed under the CAISO’s Operational Control, \nwhich facilities form part of the CAISO Controlled Grid. \nParty or Parties shall mean the Participating TO, CAISO, Large Load Interconnection \nCustomer or the applicable combination of the above. \nPoint of Interconnection shall mean the point, as set forth in Appendix A to this LLIA, \nwhere the Interconnection Facilities connect to the Participating TO’s Transmission System. \nReasonable Efforts shall mean, with respect to an action required to be attempted or \ntaken by a Party under this LLIA, efforts that are timely and consistent with Good Utility \nPractice and are otherwise substantially equivalent to those a Party would use to protect its own \ninterests. \nScoping Meeting shall mean the meeting among representatives of the  Large Load \nInterconnection Customer, the Participating TO(s), and, as applicable the CAISO and other \nAffected Systems, conducted for the purpose of discussing alternative interconnection options, to \nexchange information including any transmission data and earlier study evaluations that would \nbe reasonably expected to impact such interconnection options, to analyze such information, and \nto determine the potential feasible Points of Interconnection. \nSystem Protection Facilities shall mean the equipment, including necessary protection \nsignal communications equipment, that protects: (1) the Participating TO’s Transmission \nSystem, Participating TO’s Interconnection Facilities, CAISO Controlled Grid, and Affected \nSystems from faults or other electrical disturbances occurring at the Large Load Interconnection \nCustomer’s Interconnection Facilities; and (2) the Large Load Facility from faults or other \nelectrical system disturbances occurring on the CAISO Controlled Grid, Participating TO’s"},{"page":95,"startToken":33830,"endToken":34275,"text":"8 \nInterconnection Facilities, and Affected Systems or on other delivery systems or other generating \nsystems to which the CAISO Controlled Grid is directly connected.  \nTransmission Control Agreement shall mean CAISO FERC Electric Tariff No. 7. \nTrial Operation shall mean the period during which the Large Load Interconnection \nCustomer is engaged in on-site test operations and commissioning of the Large Load Facility \nprior to Commercial Operation. \nArticle 2. Effective Date, Term and Termination \n2.1 \nEffective Date. This LLIA shall become effective upon execution by all Parties subject \nto acceptance by FERC (if applicable), or if filed unexecuted, upon the date specified by \nFERC. The Participating TO shall promptly file this LLIA with FERC upon execution in \naccordance with Article 3.1, if required. \n2.2 \nTerm of Agreement. Subject to the provisions of Article 2.3, this LLIA shall remain in \neffect for a period of ten (10) years from the Effective Date (Term Specified in individual \nagreements to be ten (10) years or such other longer period as the Large Load \nInterconnection Customer may request) and shall be automatically renewed for each \nsuccessive one-year period thereafter. \n2.3 \nTermination Procedures. \n2.3.1 Written Notice. This LLIA may be terminated by the Large Load Interconnection \nCustomer after giving the Participating TO and, as applicable CAISO, ninety (90) \nCalendar Days advance written notice, or by the Participating TO notifying FERC \nafter the Large Load Facility permanently ceases Commercial Operation. \n2.3.2 Default. A Party may terminate this LLIA in accordance with Article 17. \n2.3.3 Suspension of Work. This LLIA may be deemed terminated in accordance with \nArticle 5.14, if applicable. \n2.3.4 Notwithstanding Articles 2.3.1, 2.3.2, and 2.3.3, no termination shall become \neffective until the Parties have complied with all Applicable Laws and Regulations \napplicable to such termination, including the filing with FERC of a notice of \ntermination of this LLIA (if applicable), which notice has been accepted for filing \nby FERC, and the Large Load Interconnection Customer has fulfilled its \ntermination cost obligations under Article 2.4. \n2.4 \nTermination Costs. Immediately upon the other Parties’ receipt of a notice of the \ntermination of this LLIA pursuant to Article 2.3 above, the Participating TO will \ndetermine the total cost responsibility of the Large Load Interconnection Customer. If, as \nof the date of the other Parties’ receipt of the notice of termination, the Large Load \nInterconnection Customer has not already paid its share of Network Upgrade costs, as set \nforth in Appendix G to this LLIA, the Participating TO will liquidate the Large Load \nInterconnection Customer’s Interconnection Financial Security associated with its cost"},{"page":96,"startToken":34275,"endToken":34788,"text":"9 \nresponsibility for Network Upgrades, in accordance with Appendix IV, Attachment 4 of \nthe Participating TO’s tariff. \nThe Large Load Interconnection Customer will also be responsible for all costs incurred \nor irrevocably committed to be incurred in association with the construction of the \nParticipating TO’s Interconnection Facilities (including any cancellation costs relating to \norders or contracts for Interconnection Facilities and equipment) and other such expenses, \nincluding any Distribution Upgrades for which the Participating TO has incurred \nexpenses or has irrevocably committed to incur expenses and has not been reimbursed by \nthe Large Load Interconnection Customer, as of the date of the other Parties’ receipt of \nthe notice of termination, subject to the limitations set forth in this Article 2.4. Nothing in \nthis Article 2.4 shall limit the Parties’ rights under Article 17. If, as of the date of the \nother Parties’ receipt of the notice of termination, the Large Load Interconnection \nCustomer has not already reimbursed the Participating TO for costs incurred to construct \nthe Participating TO’s Interconnection Facilities, the Participating TO will liquidate the \nLarge Load Interconnection Customer’s Interconnection Financial Security associated \nwith the construction of the Participating TO’s Interconnection Facilities. If the amount \nof the Interconnection Financial Security liquidated by the Participating TO under this \nArticle 2.4 is insufficient to compensate the Participating TO for actual costs associated \nwith the construction of the Participating TO’s Interconnection Facilities contemplated in \nthis Article, any additional amounts will be the responsibility of the Large Load \nInterconnection Customer. Any such additional amounts due from the Large Load \nInterconnection Customer beyond the amounts covered by its Interconnection Financial \nSecurity will be due to the Participating TO immediately upon termination of this LLIA. \nIf the amount of the Interconnection Financial Security exceeds the Interconnection \nCustomer’s cost responsibility under this LLIA, any excess amount will be released to the \nInterconnection Customer. \n2.4.1 Large Load Interconnection.  Notwithstanding the foregoing, in the event of \ntermination by a Party, all Parties shall use commercially Reasonable Efforts to \nmitigate the costs, damages, and charges arising as a consequence of termination. \nWith respect to any portion of the Participating TO’s Interconnection Facilities that \nhave not yet been constructed or installed, the Participating TO shall to the extent \npossible, and with the Large Load Interconnection Customer’s authorization, cancel \nany pending orders of, or return, any materials or equipment for, or contracts for \nconstruction of, such facilities; provided that in the event the Large Load \nInterconnection Customer elects not to authorize such cancellation, the Large Load \nInterconnection Customer shall assume all payment obligations with respect to such \nmaterials, equipment, and contracts, and the Participating TO shall deliver such \nmaterial and equipment, and, if necessary, assign such contracts, to the Large Load \nInterconnection Customer as soon as practicable, at the Large Load Interconnection \nCustomer’s expense. To the extent that the Large Load Interconnection Customer \nhas already paid the Participating TO for any or all such costs of materials or \nequipment not taken by the Large Load Interconnection Customer, the Participating \nTO shall promptly refund such amounts to the Large Load Interconnection"},{"page":97,"startToken":34788,"endToken":35248,"text":"10 \nCustomer, less any costs, including penalties, incurred by the Participating TO to \ncancel any pending orders of, or return such materials, equipment, or contracts. \n2.4.2 The Participating TO may, at its option, retain any portion of such materials, \nequipment, or facilities that the Large Load Interconnection Customer chooses not \nto accept delivery of, in which case the Participating TO shall be responsible for all \ncosts associated with procuring such materials, equipment, or facilities. \n2.4.3 With respect to any portion of the Interconnection Facilities, and any other facilities \nalready installed or constructed pursuant to the terms of this LLIA, Large Load \nInterconnection Customer shall be responsible for all costs associated with the \nremoval, relocation or other disposition or retirement of such materials, equipment, \nor facilities. \n2.5 \nDisconnection. Upon termination of this LLIA, the Parties will take all appropriate steps \nto disconnect the Large Load Facility from the Participating TO’s Transmission System. \nAll costs required to effectuate such disconnection shall be borne by the terminating \nParty, unless such termination resulted from the non-terminating Party’s Default of this \nLLIA or such non-terminating Party otherwise is responsible for these costs under this \nLLIA. \n2.6 \nSurvival. This LLIA shall continue in effect after termination to the extent necessary to \nprovide for final billings and payments and for costs incurred hereunder, including \nbillings and payments pursuant to this LLIA; to permit the determination and \nenforcement of liability and indemnification obligations arising from acts or events that \noccurred while this LLIA was in effect; and to permit each Party to have access to the \nlands of the other Parties pursuant to this LLIA or other applicable agreements, to \ndisconnect, remove or salvage its own facilities and equipment. \nArticle 3. Regulatory Filings and CAISO Tariff Compliance \n3.1 \nFiling. The Participating TO shall file this LLIA (and any amendment hereto) with the \nappropriate Governmental Authority(ies), if required. The Large Load Interconnection \nCustomer may request that any information provided be subject to the confidentiality \nprovisions of Article 22. If the Large Load Interconnection Customer has executed this \nLLIA, or any amendment thereto, the Large Load Interconnection Customer shall \nreasonably cooperate with the Participating TO and, as applicable, CAISO with respect to \nsuch filing and to provide any information reasonably requested by the Participating TO \nor CAISO as needed to comply with applicable regulatory requirements. \n3.2 \nAgreement Subject to CAISO Tariff. The Large Load Interconnection Customer will \ncomply with all applicable provisions of the CAISO Tariff, including the GIDAP as may \nbe required pursuant to Appendix H for co-located or Behind-the-Meter Generation. \nArticle 4. Scope of Service \n4.1 \nLarge Load Interconnection Service. Large Load Interconnection Service allows the \nLarge Load Interconnection Customer to connect the Large Load Facility to the"},{"page":98,"startToken":35248,"endToken":35689,"text":"11 \nParticipating TO’s Transmission System and be eligible to receive energy from the \nCAISO Controlled Grid. To the extent the Large Load Interconnection Customer wants \nto receive Large Load Interconnection Service, the Participating TO shall construct \nfacilities identified in Appendices A and C that the Participating TO is responsible to \nconstruct. \n4.2 \nProvision of Service. The Participating TO shall provide Interconnection Service for the \nLarge Load Facility. Any Interconnection Service subject to Appendix H shall be \nnegotiated between the Participating TO, Large Load Interconnection Customer and the \nCAISO.  \n4.3 \nPerformance Standards. Each Party shall perform all of its obligations under this LLIA \nin accordance with Applicable Laws and Regulations, Applicable Reliability Standards, \nand Good Utility Practice, and to the extent a Party is required or prevented or limited in \ntaking any action by such regulations and standards, such Party shall not be deemed to be \nin Breach of this LLIA for its compliance therewith. If such Party is the Participating TO, \nthen that Party shall amend the LLIA and submit the amendment to FERC for approval. \n4.4 \nNo Transmission Service. The execution of this LLIA does not constitute a request for, \nnor the provision of, any transmission service over the Participating TO’s Transmission \nSystem, and does not convey any right to deliver electricity to, or receive electricity from, \nany specific point of delivery. Large Load Interconnection Customer must request \ntransmission service from CAISO, including through a Scheduling Coordinator, in \naccordance with the CAISO Tariff.  \nArticle 5. Large Load Interconnect Customer’s Interconnection Facilities Engineering, \nProcurement, And Construction \n5.1 \nDesign Requirements.  Interconnection Facilities, Network Upgrades, and Distribution \nUpgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. \nSuch studies, design and construction shall be based on the assumed accuracy and \ncompleteness of all technical information received by the Participating TO from the \nLarge Load Interconnection Customer associated with interconnecting the Large Load \nFacility. \n5.1.1 Standard Option. The Participating TO shall design, procure, and construct the \nParticipating TO’s Interconnection Facilities, Network Upgrades using Reasonable \nEfforts to complete the Participating TO’s Interconnection Facilities and Network \nUpgrades by the dates set forth in Appendix B, Milestones. The Participating TO \nshall not be required to undertake any action which is inconsistent with its standard \nsafety practices, its material and equipment specifications, its design criteria and \nconstruction procedures, its labor agreements, and Applicable Laws and \nRegulations. In the event the Participating TO reasonably expects that it will not be \nable to complete the Participating TO’s Interconnection Facilities, Network \nUpgrades, and Distribution Upgrades by the specified dates, the Participating TO \nshall promptly provide written notice to the Large Load Interconnection Customer"},{"page":99,"startToken":35689,"endToken":36169,"text":"12 \nand, as applicable, the CAISO and the Participating TO shall undertake Reasonable \nEfforts to meet the earliest dates thereafter.    \n5.2 \nLiquidated Damages. The actual damages to the Large Load Interconnection Customer, \nin the event the Participating TO’s Interconnection Facilities or Network Upgrades are \nnot completed by the dates designated by the Large Load Interconnection Customer and \naccepted by the Participating TO, may include Large Load Interconnection Customer’s \nfixed operation and maintenance costs and lost opportunity costs. Such actual damages \nare uncertain and impossible to determine at this time. Because of such uncertainty, any \nliquidated damages paid by the Participating TO the Large Load Interconnection \nCustomer in the event that the Participating TO does not complete any portion of the \nParticipating TO’s Interconnection Facilities or Network Upgrades by the applicable \ndates, shall be an amount equal to one half of one percent (½ of 1%) per day of the actual \ncost of the Participating TO’s Interconnection Facilities and Network Upgrades, in the \naggregate, for which the Participating TO has assumed responsibility to design, procure \nand construct. \nHowever, in no event shall the total liquidated damages exceed twenty percent (20%) of \nthe actual cost of the Participating TO’s Interconnection Facilities and Network Upgrades \nfor which the Participating TO has assumed responsibility to design, procure, and \nconstruct. The foregoing payments will be made by the Participating TO the Large Load \nInterconnection Customer as just compensation for the damages caused to the Large Load \nInterconnection Customer, which actual damages are uncertain and impossible to \ndetermine at this time, and as reasonable liquidated damages, but not as a penalty or a \nmethod to secure performance of this LLIA. Liquidated damages, when the Parties agree \nto them, are the exclusive remedy for the Participating TO’s failure to meet its schedule. \nNo liquidated damages shall be paid to the Large Load Interconnection Customer if: (1) \nthe Large Load Interconnection Customer is not ready to commence use of the \nParticipating TO’s Interconnection Facilities or Network Upgrades to take the delivery of \npower for the Large Load Facility’s Trial Operation, unless the Large Load \nInterconnection Customer would have been able to commence use of the Participating \nTO’s Interconnection Facilities or Network Upgrades to take the delivery of power for \nLarge Load Facility’s Trial Operation, but for the Participating TO’s delay; and (2) the \nParticipating TO’s failure to meet the specified dates is the result of the action or inaction \nof the Large Load Interconnection Customer or any other interconnection customer who \nhas entered into an interconnection agreement with the Participating TO and/or CAISO, \naction or inaction by the CAISO, or any cause beyond the Participating TO’s reasonable \ncontrol or reasonable ability to cure.   \nIn no event shall the Participating TO have any responsibility or liability to the Large \nLoad Interconnection Customer for liquidated damages pursuant to the provisions of this \nArticle 5.2. \n5.3 \nReserved."},{"page":100,"startToken":36169,"endToken":36578,"text":"13 \n5.4 \nEquipment Procurement. Participating TO shall commence design of the Participating \nTO’s Interconnection Facilities or Network Upgrades and procure necessary equipment \nas soon as practicable after all of the following conditions are satisfied, unless the Parties \notherwise agree in writing: \n5.4.1 The Participating TO has received written authorization to proceed with design and \nprocurement from the Large Load Interconnection Customer by the date specified \nin Appendix B, Milestones; and \n5.4.2 The Large Load Interconnection Customer has provided security to the \nParticipating TO in accordance with Article 11.3 by the dates specified in Appendix \nB, Milestones. \n5.5 \nConstruction Commencement. The Participating TO shall commence construction of \nthe Participating TO’s Interconnection Facilities and Network Upgrades for which it is \nresponsible as soon as practicable after the following additional conditions are satisfied: \n5.5.1 Approval of the appropriate Governmental Authority has been obtained for any \nfacilities requiring regulatory approval; \n5.5.2 Necessary real property rights and rights-of-way have been obtained, to the extent \nrequired for the construction of a discrete aspect of the Participating TO’s \nInterconnection Facilities and Network Upgrades; \n5.5.3 The Participating TO has received written authorization to proceed with \nconstruction from the Large Load Interconnection Customer by the date specified in \nAppendix B, Milestones; and \n5.5.4 The Large Load Interconnection Customer has provided payment and security to \nthe Participating TO in accordance with Article 11.3 by the dates specified in \nAppendix B, Milestones. \n5.6 \nWork Progress. The Parties will keep each other advised periodically as to the progress \nof their respective design, procurement and construction efforts. Any Party may, at any \ntime, request a progress report from another Party. If, at any time, the Large Load \nInterconnection Customer determines that the completion of the Participating TO’s \nInterconnection Facilities will not be required until after the specified In-Service Date, \nthe Large Load Interconnection Customer will provide written notice to the Participating \nTO and, as applicable, CAISO of such later date upon which the completion of the \nParticipating TO’s Interconnection Facilities will be required. \n5.7 \nInformation Exchange. As soon as reasonably practicable after the Effective Date, the \nParties shall exchange information regarding the design and compatibility of the Large \nLoad Interconnection Customer’s Interconnection Facilities and Participating TO’s \nInterconnection Facilities and compatibility of the Interconnection Facilities with the \nParticipating TO’s Transmission System, and shall work diligently and in good faith to \nmake any necessary design changes."},{"page":101,"startToken":36578,"endToken":37020,"text":"14 \n5.8 \nLimited Operation. If any of the Participating TO’s Interconnection Facilities or \nNetwork Upgrades are not reasonably expected to be completed prior to the Commercial \nOperation Date of the Large Load Facility, the Participating TO shall, upon the request \nand at the expense of the Large Load Interconnection Customer, perform operating \nstudies on a timely basis to determine the extent to which the Large Load Facility and the \nLarge Load Interconnection Customer’s Interconnection Facilities may operate prior to \nthe completion of the Participating TO’s Interconnection Facilities or Network Upgrades \nconsistent with Applicable Laws and Regulations, Applicable Reliability Standards, \nGood Utility Practice, and this LLIA. The Participating TO shall permit the Large Load \nInterconnection Customer to operate the Large Load Facility and the Large Load \nInterconnection Customer’s Interconnection Facilities in accordance with the results of \nsuch studies. \n5.9 \nLarge Load Interconnection Customer’s Interconnection Facilities. The Large Load \nInterconnection Customer shall, at its expense, design, procure, construct, own, and \ninstall the Large Load Interconnection Customer’s Interconnection Facilities, as set forth \nin Appendices A and H, as applicable. \n5.9.1 Large Load Facility and Large Load Interconnection Customer’s \nInterconnection Facilities Specifications. In addition to the Large Load \nInterconnection Customer’s responsibility to submit technical data with its Large \nLoad Interconnection Application, Large Load Interconnection Customer shall \nsubmit all remaining necessary specifications for the Large Load Interconnection \nCustomer’s Interconnection Facilities and Large Load Facility, including System \nProtection Facilities, to the Participating TO (who shall provide such information to \nthe CAISO) at least one hundred eighty (180) Calendar Days prior to the \nCommercial Operation Date. The Participating TO shall review such specifications \npursuant to this LLIA and the LLIP to ensure that the Large Load Interconnection \nCustomer’s Interconnection Facilities and Large Load Facility are compatible with \nthe technical specifications, operational control, safety requirements, and any other \napplicable requirements of the Participating TO and comment on such \nspecifications within thirty (30) Calendar Days of the Large Load Interconnection \nCustomer’s submission. All specifications provided hereunder shall be deemed \nconfidential. \n5.9.2 Participating TO’s Review. The Participating TO’s review of the Large Load \nInterconnection Customer’s final specifications shall not be construed as \nconfirming, endorsing, or providing a warranty as to the design, fitness, safety, \ndurability or reliability of the Large Load Facility, or the Large Load \nInterconnection Customer’s Interconnection Facilities. Large Load Interconnection \nCustomer shall make such changes to the Large Load Interconnection Customer’s \nInterconnection Facilities as may reasonably be required by the Participating TO, in \naccordance with Good Utility Practice, to ensure that the Large Load \nInterconnection Customer’s Interconnection Facilities are compatible with the \ntechnical specifications, Operational Control, and safety requirements of the \nParticipating TO."},{"page":102,"startToken":37020,"endToken":37503,"text":"15 \n5.9.3 Large Load Interconnection Customer’s Interconnection Facilities \nConstruction. The Large Load Interconnection Customer’s Interconnection \nFacilities shall be designed and constructed in accordance with Good Utility \nPractice. Within one hundred twenty (120) Calendar Days after the Commercial \nOperation Date, unless the Participating TO and Large Load Interconnection \nCustomer agree on another mutually acceptable deadline, the Large Load \nInterconnection Customer shall deliver to the Participating TO “as-built” drawings, \ninformation and documents for the Large Load Interconnection Customer’s \nInterconnection Facilities and the Large Load Facility(s), such as: a one-line \ndiagram, a site plan showing the Large Load Facility and the Large Load \nInterconnection Customer’s Interconnection Facilities, plan and elevation drawings \nshowing the layout of the Large Load Interconnection Customer’s Interconnection \nFacilities, a relay functional diagram, relaying AC and DC schematic wiring \ndiagrams and relay settings for all facilities associated with the Large Load \nInterconnection Customer’s step-up transformers, the facilities connecting the Large \nLoad Facility to the step-up transformers and the Large Load Interconnection \nCustomer’s Interconnection Facilities, and the impedances (determined by factory \ntests) for the associated step-up transformers and the Large Load Facilities. The \nLarge Load Interconnection Customer shall provide the Participating TO \nspecifications for the automatic voltage regulator, Large Load Facility control and \nprotection settings, transformer tap settings, and communications, if applicable. \nAny deviations from the relay settings, machine specifications, and other \nspecifications originally submitted by the Large Load Interconnection Customer \nshall be assessed by the Participating TO pursuant to the appropriate provisions of \nthis LLIA and the LLIP. \n5.10 \nParticipating TO’s Interconnection Facilities Construction. The Participating TO’s \nInterconnection Facilities shall be designed and constructed in accordance with Good \nUtility Practice. Upon request, within one hundred twenty (120) Calendar Days after the \nCommercial Operation Date, unless the Participating TO and Large Load Interconnection \nCustomer agree on another mutually acceptable deadline, the Participating TO shall \ndeliver to the Large Load Interconnection Customer and the CAISO the following: “as-\nbuilt” drawings, information and documents for the Participating TO’s Interconnection \nFacilities, including appropriate drawings and relay diagrams. \nThe Participating TO will obtain control for operating and maintenance purposes of the \nParticipating TO’s Interconnection Facilities upon completion of such facilities.  \n5.11 \nAccess Rights. Upon reasonable notice and supervision by a Party, and subject to any \nrequired or necessary regulatory approvals, a Party (“Granting Party”) shall furnish at no \ncost to the other Party (“Access Party”) any rights of use, licenses, rights of way and \neasements with respect to lands owned or controlled by the Granting Party, its agents (if \nallowed under the applicable agency agreement), or any Affiliate, that are necessary to \nenable the Access Party to obtain ingress and egress to construct, operate, maintain, \nrepair, test (or witness testing), inspect, replace or remove facilities and equipment to: (i) \ninterconnect the Large Load Facility with the Participating TO’s Transmission System; \n(ii) operate and maintain the Large  Load Facility, the Interconnection Facilities and the"},{"page":103,"startToken":37503,"endToken":37994,"text":"16 \nParticipating TO’s Transmission System; and (iii) disconnect or remove the Access \nParty’s facilities and equipment upon termination of this LLIA. In exercising such rights \nof use, licenses, rights of way and easements, the Access Party shall not unreasonably \ndisrupt or interfere with normal operation of the Granting Party’s business and shall \nadhere to the safety rules and procedures established in advance, as may be changed from \ntime to time, by the Granting Party and provided to the Access Party. \n5.12 \nLands of Other Property Owners. If any part of the Participating TO’s Interconnection \nFacilities and/or Network Upgrades are to be installed on property owned by persons \nother than the Large Load Interconnection Customer or Participating TO, the \nParticipating TO shall at the Large Load Interconnection Customer’s expense use efforts, \nsimilar in nature and extent to those that it typically undertakes on its own behalf or on \nbehalf of its Affiliates, including use of its eminent domain authority, and to the extent \nconsistent with state law, to procure from such persons any rights of use, licenses, rights \nof way and easements that are necessary to construct, operate, maintain, test, inspect, \nreplace or remove the Participating TO’s Interconnection Facilities and/or Network \nUpgrades upon such property. \n5.13 \nPermits. Participating TO and Large Load Interconnection Customer shall cooperate \nwith each other in good faith in obtaining all permits, licenses and authorizations that are \nnecessary to accomplish the interconnection in compliance with Applicable Laws and \nRegulations. With respect to this paragraph, the Participating TO shall provide permitting \nassistance to the Large Load Interconnection Customer comparable to that provided to \nthe Participating TO’s own, or an Affiliate’s generation. \n5.14 \nSuspension. The Large Load Interconnection Customer may request to suspend at any \ntime all work associated with the construction and installation of the Participating TO’s \nInterconnection Facilities, Network Upgrades, and/or Distribution Upgrades required \nunder this LLIA, other than Network Upgrades or Alternative Transmission Technologies \nsolutions identified in the Large Load Interconnection Studies that are not subject to \nsuspension. Large Load Interconnection Customers seeking to suspend construction will \nprovide the Participating TO a request to suspend.  The Participating TO shall evaluate a \nrequest to suspend work submitted pursuant to this Article 5.14 and may approve \nsuspension requests where the Participating TO’s Transmission System can be left in a \nsafe and reliable condition in accordance with Good Utility Practice, the Participating \nTO’s safety and reliability criteria, and Applicable Reliability Standards and Participating \nTO will not be subject to financial harm.  \n5.15 \nTaxes. \n5.15.1 Large Load Interconnection Customer Payments Not Taxable. The Parties \nintend that all payments or property transfers made by the Large Load \nInterconnection Customer to the Participating TO for the installation of the \nParticipating TO’s Interconnection Facilities and the Network Upgrades shall be \nnon-taxable, either as contributions to capital, or as a refundable advance, in \naccordance with the Internal Revenue Code and any applicable state income tax"},{"page":104,"startToken":37994,"endToken":38533,"text":"17 \nlaws and shall not be taxable as contributions in aid of construction or otherwise \nunder the Internal Revenue Code and any applicable state income tax laws. \n5.15.2 Representations And Covenants. In accordance with IRS Notice 2001-82 and IRS \nNotice 88-129, the Large Load Interconnection Customer represents and covenants \nthat: (i) for income tax purposes, the amount of any payments and the cost of any \nproperty transferred to the Participating TO for the Participating TO’s \nInterconnection Facilities will be capitalized by the Large Load Interconnection \nCustomer as an intangible asset and recovered using the straight-line method over a \nuseful life of twenty (20) years; and (ii) any portion of the Participating TO’s \nInterconnection Facilities that is a “dual-use intertie,” within the meaning of IRS \nNotice 88-129, is reasonably expected to carry only a de minimis amount of \nelectricity away from the Large Load Facility. For this purpose, “de minimis \namount” means no more than 5 percent of the total power flows in both directions, \ncalculated in accordance with the “5 percent test” set forth in IRS Notice 88-129. \nThis is not intended to be an exclusive list of the relevant conditions that must be \nmet to conform to IRS requirements for non-taxable treatment. \nAt the Participating TO’s request, the Large Load Interconnection Customer shall \nprovide the Participating TO with a report from an independent engineer \nconfirming its representation in clause (iii), above. The Participating TO \nrepresents and covenants that the cost of the Participating TO’s Interconnection \nFacilities paid for by the Large Load Interconnection Customer without the \npossibility of refund or credit will have no net effect on the base upon which rates \nare determined. \n5.15.3 Indemnification for the Cost Consequence of Current Tax Liability Imposed \nUpon the Participating TO. Notwithstanding Article 5.15.1, the Large Load \nInterconnection Customer shall protect, indemnify and hold harmless the \nParticipating TO from the cost consequences of any current tax liability imposed \nagainst the Participating TO as the result of payments or property transfers made by \nthe Large Load Interconnection Customer to the Participating TO under this LLIA \nfor Interconnection Facilities, as well as any interest and penalties, other than \ninterest and penalties attributable to any delay caused by the Participating TO. The \nParticipating TO shall not include a gross-up for the cost consequences of any \ncurrent tax liability in the amounts it charges the Large Load Interconnection \nCustomer under this LLIA unless (i) the Participating TO has determined, in good \nfaith, that the payments or property transfers made by the Large Load \nInterconnection Customer to the Participating TO should be reported as income \nsubject to taxation or (ii) any Governmental Authority directs the Participating TO \nto report payments or property as income subject to taxation; provided, however, \nthat the Participating TO may require the Large Load Interconnection Customer to \nprovide security for Interconnection Facilities, in a form reasonably acceptable to \nthe Participating TO (such as a parental guarantee or a letter of credit), in an amount \nequal to the cost consequences of any current tax liability under this Article 5.15. \nThe Large Load Interconnection Customer shall reimburse the Participating TO for \nsuch costs on a fully grossed-up basis, in accordance with Article 5.15.4, within"},{"page":105,"startToken":38533,"endToken":39069,"text":"18 \nthirty (30) Calendar Days of receiving written notification from the Participating \nTO of the amount due, including detail about how the amount was calculated. \nThe indemnification obligation shall terminate at the earlier of (1) the expiration \nof the ten year testing period and the applicable statute of limitation, as it may be \nextended by the Participating TO upon request of the IRS, to keep these years \nopen for audit or adjustment, or (2) the occurrence of a subsequent taxable event \nand the payment of any related indemnification obligations as contemplated by \nthis Article 5.15. \n5.15.4 Tax Gross-Up Amount. The Large Load Interconnection Customer’s liability for \nthe cost consequences of any current tax liability under this Article 5.15 shall be \ncalculated on a fully grossed-up basis. Except as may otherwise be agreed to by the \nParties, this means that the Large Load Interconnection Customer will pay the \nParticipating TO, in addition to the amount paid for the Interconnection Facilities \nand Network Upgrades, an amount equal to (1) the current taxes imposed on the \nParticipating TO (“Current Taxes”) on the excess of (a) the gross income realized \nby the Participating TO as a result of payments or property transfers made by the \nLarge Load Interconnection Customer to the Participating TO under this LLIA \n(without regard to any payments under this Article 5.15) (the “Gross Income \nAmount”) over (b) the present value of future tax deductions for depreciation that \nwill be available as a result of such payments or property transfers (the “Present \nValue Depreciation Amount”), plus (2) an additional amount sufficient to permit \nthe Participating TO to receive and retain, after the payment of all Current Taxes, \nan amount equal to the net amount described in clause (1). \nFor this purpose, (i) Current Taxes shall be computed based on the Participating \nTO’s composite federal and state tax rates at the time the payments or property \ntransfers are received and the Participating TO will be treated as being subject to \ntax at the highest marginal rates in effect at that time (the “Current Tax Rate”), \nand (ii) the Present Value Depreciation Amount shall be computed by discounting \nthe Participating TO’s anticipated tax depreciation deductions as a result of such \npayments or property transfers by the Participating TO’s current weighted average \ncost of capital. Thus, the formula for calculating the Large Load Interconnection \nCustomer’s liability to the Participating TO pursuant to this Article 5.15.4 can be \nexpressed as follows: (Current Tax Rate x (Gross Income Amount – Present \nValue of Tax Depreciation))/(1-Current Tax Rate). Large Load Interconnection \nCustomer’s estimated tax liability in the event taxes are imposed shall be stated in \nAppendix A, Interconnection Facilities, Network Upgrades and Distribution \nUpgrades. \n5.15.5 Private Letter Ruling or Change or Clarification of Law. At the Large Load \nInterconnection Customer’s request and expense, the Participating TO shall file \nwith the IRS a request for a private letter ruling as to whether any property \ntransferred or sums paid, or to be paid, by the Large Load Interconnection Customer \nto the Participating TO under this LLIA are subject to federal income taxation. The \nLarge Load Interconnection Customer will prepare the initial draft of the request for"},{"page":106,"startToken":39069,"endToken":39598,"text":"19 \na private letter ruling, and will certify under penalties of perjury that all facts \nrepresented in such request are true and accurate to the best of the Large Load \nInterconnection Customer’s knowledge. The Participating TO and Large Load \nInterconnection Customer shall cooperate in good faith with respect to the \nsubmission of such request, provided, however, the Large Load Interconnection \nCustomer and the Participating TO explicitly acknowledge (and nothing herein is \nintended to alter) Participating TO’s obligation under law to certify that the facts \npresented in the ruling request are true, correct and complete. \nThe Participating TO shall keep the Large Load Interconnection Customer fully \ninformed of the status of such request for a private letter ruling and shall execute \neither a privacy act waiver or a limited power of attorney, in a form acceptable to \nthe IRS, that authorizes the Large Load Interconnection Customer to participate in \nall discussions with the IRS regarding such request for a private letter ruling. The \nParticipating TO shall allow the Large Load Interconnection Customer to attend \nall meetings with IRS officials about the request and shall permit the Large Load \nInterconnection Customer to prepare the initial drafts of any follow-up letters in \nconnection with the request. \n5.15.6 Subsequent Taxable Events. If, within ten (10) years from the date on which the \nrelevant Participating TO’s Interconnection Facilities are placed in service, (i) the \nLarge Load Interconnection Customer Breaches the covenants contained in Article \n5.15.2, (ii) a “disqualification event” occurs within the meaning of IRS Notice 88-\n129, or (iii) this LLIA terminates and the Participating TO retains ownership of the \nInterconnection Facilities and Network Upgrades, the Large Load Interconnection \nCustomer shall pay a tax gross-up for the cost consequences of any current tax \nliability imposed on the Participating TO, calculated using the methodology \ndescribed in Article 5.15.4 and in accordance with IRS Notice 9060. \n5.15.7 Contests. In the event any Governmental Authority determines that the \nParticipating TO’s receipt of payments or property constitutes income that is subject \nto taxation, the Participating TO shall notify the Large Load Interconnection \nCustomer, in writing, within thirty (30) Calendar Days of receiving notification of \nsuch determination by a Governmental Authority. Upon the timely written request \nby the Large Load Interconnection Customer and at the Large Load Interconnection \nCustomer’s sole expense, the Participating TO may appeal, protest, seek abatement \nof, or otherwise oppose such determination. Upon the Large Load Interconnection \nCustomer’s written request and sole expense, the Participating TO may file a claim \nfor refund with respect to any taxes paid under this Article 5.15, whether or not it \nhas received such a determination. The Participating TO reserves the right to make \nall decisions with regard to the prosecution of such appeal, protest, abatement or \nother contest, including the selection of counsel and compromise or settlement of \nthe claim, but the Participating TO shall keep the Large Load Interconnection \nCustomer informed, shall consider in good faith suggestions from the Large Load \nInterconnection Customer about the conduct of the contest, and shall reasonably \npermit the Large Load Interconnection Customer or an Large Load Interconnection \nCustomer representative to attend contest proceedings."},{"page":107,"startToken":39598,"endToken":40096,"text":"20 \nThe Large Load Interconnection Customer shall pay to the Participating TO on a \nperiodic basis, as invoiced by the Participating TO, the Participating TO’s \ndocumented reasonable costs of prosecuting such appeal, protest, abatement or \nother contest, including any costs associated with obtaining the opinion of \nindependent tax counsel described in this Article 5.15.7. The Participating TO \nmay abandon any contest if the Large Load Interconnection Customer fails to \nprovide payment to the Participating TO within thirty (30) Calendar Days of \nreceiving such invoice. \nAt any time during the contest, the Participating TO may agree to a settlement \neither with the Large Load Interconnection Customer’s consent or, if such consent \nis refused, after obtaining written advice from independent nationally-recognized \ntax counsel, selected by the Participating TO, but reasonably acceptable to the \nLarge Load Interconnection Customer, that the proposed settlement represents a \nreasonable settlement given the hazards of litigation. The Large Load \nInterconnection Customer’s obligation shall be based on the amount of the \nsettlement agreed to by the Large Load Interconnection Customer, or if a higher \namount, so much of the settlement that is supported by the written advice from \nnationally-recognized tax counsel selected under the terms of the preceding \nparagraph. The settlement amount shall be calculated on a fully grossed-up basis \nto cover any related cost consequences of the current tax liability. The \nParticipating TO may also settle any tax controversy without receiving the Large \nLoad Interconnection Customer’s consent or any such written advice; however, \nany such settlement will relieve the Large Load Interconnection Customer from \nany obligation to indemnify the Participating TO for the tax at issue in the contest \n(unless the failure to obtain written advice is attributable to the Large Load \nInterconnection Customer’s unreasonable refusal to the appointment of \nindependent tax counsel). \n5.15.8 Refund. In the event that: (a) a private letter ruling is issued to the Participating TO \nwhich holds that any amount paid or the value of any property transferred by the \nLarge Load Interconnection Customer to the Participating TO under the terms of \nthis LLIA is not subject to federal income taxation; (b) any legislative change or \nadministrative announcement, notice, ruling or other determination makes it \nreasonably clear to the Participating TO in good faith that any amount paid or the \nvalue of any property transferred by the Large Load Interconnection Customer to \nthe Participating TO under the terms of this LLIA is not taxable to the Participating \nTO; (c) any abatement, appeal, protest, or other contest results in a determination \nthat any payments or transfers made by the Large Load Interconnection Customer \nto the Participating TO are not subject to federal income tax; or (d) if the \nParticipating TO receives a refund from any taxing authority for any overpayment \nof tax attributable to any payment or property transfer made by the Large Load \nInterconnection Customer to the Participating TO pursuant to this LLIA, the \nParticipating TO shall promptly refund to the Large Load Interconnection Customer \nthe following:"},{"page":108,"startToken":40096,"endToken":40591,"text":"21 \n(i) \nany payment made by Large Load Interconnection Customer under this \nArticle 5.15 for taxes that is attributable to the amount determined to be \nnon-taxable, together with interest thereon, \n(ii) \ninterest on any amounts paid by the Large Load Interconnection Customer \nto the Participating TO for such taxes which the Participating TO did not \nsubmit to the taxing authority, calculated in accordance with the \nmethodology set forth in FERC’s regulations at 18 C.F.R. \n§35.19a(a)(2)(iii) from the date payment was made by the Large Load \nInterconnection Customer to the date the Participating TO refunds such \npayment to the Large Load Interconnection Customer, and \n(iii) \nwith respect to any such taxes paid by the Participating TO, any refund or \ncredit the Participating TO receives or to which it may be entitled from \nany Governmental Authority, interest (or that portion thereof attributable \nto the payment described in clause (i), above) owed to the Participating \nTO for such overpayment of taxes (including any reduction in interest \notherwise payable by the Participating TO to any Governmental Authority \nresulting from an offset or credit); provided, however, that the \nParticipating TO will remit such amount promptly to the Large Load \nInterconnection Customer only after and to the extent that the Participating \nTO has received a tax refund, credit or offset from any Governmental \nAuthority for any applicable overpayment of income tax related to the \nParticipating TO’s Interconnection Facilities. \nThe intent of this provision is to leave the Parties, to the extent practicable, in the \nevent that no taxes are due with respect to any payment for Interconnection \nFacilities and Network Upgrades hereunder, in the same position they would have \nbeen in had no such tax payments been made. \n5.15.9 Taxes Other Than Income Taxes. Upon the timely request by the Large Load \nInterconnection Customer, and at the Large Load Interconnection Customer’s sole \nexpense, the Participating TO may appeal, protest, seek abatement of, or otherwise \ncontest any tax (other than federal or state income tax) asserted or assessed against \nthe Participating TO for which the Large Load Interconnection Customer may be \nrequired to reimburse the Participating TO under the terms of this LLIA. The Large \nLoad Interconnection Customer shall pay to the Participating TO on a periodic \nbasis, as invoiced by the Participating TO, the Participating TO’s documented \nreasonable costs of prosecuting such appeal, protest, abatement, or other contest. \nThe Large Load Interconnection Customer and the Participating TO shall cooperate \nin good faith with respect to any such contest. Unless the payment of such taxes is a \nprerequisite to an appeal or abatement or cannot be deferred, no amount shall be \npayable by the Large Load Interconnection Customer to the Participating TO for \nsuch taxes until they are assessed by a final, non-appealable order by any court or \nagency of competent jurisdiction. In the event that a tax payment is withheld and \nultimately due and payable after appeal, the Large Load Interconnection Customer"},{"page":109,"startToken":40591,"endToken":41061,"text":"22 \nwill be responsible for all taxes, interest and penalties, other than penalties \nattributable to any delay caused by the Participating TO. \n5.16 \nTax Status. Each Party shall cooperate with the others to maintain the other Parties’ tax \nstatus.  \nArticle 6. Large Load Interconnection Testing and Inspection \n6.1 \nPre-Commercial Operation Date Testing and Modifications. Prior to the Commercial \nOperation Date, the Participating TO shall test the Participating TO’s Interconnection \nFacilities, Network Upgrades, and Distribution Upgrades and the Large Load \nInterconnection Customer shall test the Large Load Facility and the Large Load \nInterconnection Customer’s Interconnection Facilities to ensure their safe and reliable \noperation. Similar testing may be required after initial operation. Each Party shall make \nany modifications to its facilities that are found to be necessary as a result of such testing. \nThe Large Load Interconnection Customer shall bear the cost of all such testing and \nmodifications. \n6.2 \nPost-Commercial Operation Date Testing and Modifications. Each Party shall at its \nown expense perform routine inspection and testing of its facilities and equipment in \naccordance with Good Utility Practice as may be necessary to ensure the continued \ninterconnection of the Large Load Facility with the Participating TO’s Transmission \nSystem in a safe and reliable manner. Each Party shall have the right, upon advance \nwritten notice, to require reasonable additional testing of the other Party’s facilities, at the \nrequesting Party’s expense, as may be in accordance with Good Utility Practice. \n6.3 \nRight to Observe Testing. Each Party shall notify the other Parties at least fourteen (14) \nCalendar Days in advance of its performance of tests of its Interconnection Facilities or \nLarge Load Facility. The other Parties have the right, at their own expense, to observe \nsuch testing. \n6.4 \nRight to Inspect. Each Party shall have the right, but shall have no obligation to: (i) \nobserve another Party’s tests and/or inspection of any of its System Protection Facilities \nand other protective equipment; (ii) review the settings of another Party’s System \nProtection Facilities and other protective equipment; and (iii) review another Party’s \nmaintenance records relative to the Interconnection Facilities, the System Protection \nFacilities and other protective equipment. A Party may exercise these rights from time to \ntime as it deems necessary upon reasonable notice to the other Party. The exercise or non-\nexercise by a Party of any such rights shall not be construed as an endorsement or \nconfirmation of any element or condition of the Interconnection Facilities or the System \nProtection Facilities or other protective equipment or the operation thereof, or as a \nwarranty as to the fitness, safety, desirability, or reliability of same. Any information that \na Party obtains through the exercise of any of its rights under this Article 6.4 shall be \ndeemed to be Confidential Information and treated pursuant to Article 22 of this LLIA."},{"page":110,"startToken":41061,"endToken":41551,"text":"23 \nArticle 7. Metering \n7.1 \nGeneral. Each Party shall comply with any Applicable Reliability Standards and the \nApplicable Reliability Council requirements. Unless otherwise agreed by the \nParticipating TO and the Large Load Interconnection Customer, the Participating TO \nmay install additional Metering Equipment at the Point of Interconnection of the Large \nLoad Facility, and shall own, operate, test and maintain such Metering Equipment. Power \nflows to the Large Load Facility shall be measured at or, at the Participating TO’s option \nfor its respective Metering Equipment, compensated to, the Point of Interconnection.  The \nLarge Load Interconnection Customer shall also install meters at each load block and at \neach individual generation source to accurately capture the demand/generation and power \nfactor of these facilities.  The Large Load Interconnection Customer shall bear all \nreasonable documented costs associated with the purchase, installation, operation, testing \nand maintenance of the Metering Equipment. \n7.2 \nCheck Meters. The Large Load Interconnection Customer, at its option and expense, \nmay install and operate, on its premises and on its side of the Point of Interconnection, \none or more check meters to check the Participating TO’s meters. Such check meters \nshall be for check purposes only and shall not be used for the measurement of power \nflows for purposes of this LLIA, except in the case that no other means are available on a \ntemporary basis at the option of the Participating TO. The check meters shall be subject \nat all reasonable times to inspection and examination by the Participating TO or their \ndesignees. The installation, operation and maintenance thereof shall be performed \nentirely by the Large Load Interconnection Customer in accordance with Good Utility \nPractice. \n7.3 \nParticipating TO Retail Metering. The Participating TO may install retail revenue \nquality meters and associated equipment, pursuant to the Participating TO’s applicable \nretail tariffs. \nArticle 8. Communications \n8.1 \nLarge Load Interconnection Customer Obligations. The Large Load Interconnection \nCustomer shall maintain satisfactory operating communications with the Participating TO \nand, as applicable, the CAISO in accordance with the provisions of the CAISO Tariff and \nwith the Participating TO’s dispatcher or representative designated by the Participating \nTO. The Large Load Interconnection Customer shall provide standard voice line, \ndedicated voice line and facsimile communications at its Large Load Facility control \nroom or central dispatch facility through use of either the public telephone system, or a \nvoice communications system that does not rely on the public telephone system. The \nLarge Load Interconnection Customer shall also provide two (2) independent dedicated \ndata circuit(s) necessary to provide Large Load Interconnection Customer data to the \nParticipating TO and, as applicable, the CAISO pursuant to the CAISO Tariff.  The data \ncircuit(s) shall extend from the Large Load Facility to the location(s) specified by the \nParticipating TO and, as applicable, the CAISO. Any required maintenance of such \ncommunications equipment shall be performed by the Large Load Interconnection \nCustomer. Operational communications shall be activated and maintained under, but not"},{"page":111,"startToken":41551,"endToken":42029,"text":"24 \nlimited to, the following events: system paralleling or separation, scheduled and \nunscheduled shutdowns, equipment clearances, and hourly and daily load data. \n8.2 \nRemote Terminal Unit. Prior to the interconnection of a Large Load Facility, a remote \nterminal unit, or equivalent data collection and transfer equipment acceptable to the \nParties, shall be installed by the Large Load Interconnection Customer, or by the \nParticipating TO at the Large Load Interconnection Customer’s expense, to gather \naccumulated and instantaneous data to be telemetered to the location(s) designated by the \nParticipating TO and, as applicable, the CAISO through use of a dedicated point-to-point \ndata circuit(s) as indicated in Article 8.1. \nFor telemetry to the Participating TO, the communication protocol for the data circuit(s) \nshall be specified by the Participating TO. Telemetry to the CAISO shall be provided in \naccordance with the CAISO’s technical standards for direct telemetry. Instantaneous bi-\ndirectional real power and reactive power flow and any other required information must \nbe telemetered directly to the location(s) specified by the Participating TO. \nEach Party will promptly advise the other Parties if it detects or otherwise learns of any \nmetering, telemetry or communications equipment errors or malfunctions that require the \nattention and/or correction by another Party. The Party owning such equipment shall \ncorrect such error or malfunction as soon as reasonably feasible. \n8.3 \nNo Annexation. Any and all equipment placed on the premises of a Party shall be and \nremain the property of the Party providing such equipment regardless of the mode and \nmanner of annexation or attachment to real property, unless otherwise mutually agreed by \nthe Parties. \nArticle 9.  Large Load Interconnection Customer Operations \n9.1 \nGeneral. Each Party shall comply with Applicable Reliability Standards and the \nApplicable Reliability Council requirements. Each Party shall provide to the other Party \nall information that may reasonably be required by the other Party to comply with \nApplicable Laws and Regulations and Applicable Reliability Standards. \n9.2 \nParticipating TO Obligations.  The Participating TO at the Large Load Interconnection \nCustomer’s expense shall cause the Participating TO’s Interconnection Facilities to be \noperated, maintained and controlled in a safe and reliable manner and in accordance with \nthis LLIA. The Participating TO may provide operating instructions to the Large Load \nInterconnection Customer consistent with this LLIA and Participating TO operating \nprotocols and procedures as they may change from time to time. The Participating TO \nwill consider changes to their operating protocols and procedures proposed by the Large \nLoad Interconnection Customer. \n9.3 \nLarge Load Interconnection Customer Obligations. The Large Load Interconnection \nCustomer shall at its own expense operate, maintain, and control the Large Load Facility \nand the Large Load Interconnection Customer’s Interconnection Facilities in a safe and \nreliable manner and in accordance with this LLIA. The Large Load Interconnection \nCustomer shall operate the Large Load Facility and the Large Load Interconnection"},{"page":112,"startToken":42029,"endToken":42470,"text":"25 \nCustomer’s Interconnection Facilities in accordance with all applicable requirements of \nthe Balancing Authority Area of which it is part, if any, including such requirements as \nset forth in Appendix C, Interconnection Details, of this LLIA. Appendix C, \nInterconnection Details, will be modified to reflect changes to the requirements as they \nmay change from time to time. A Party may request that another Party provide copies of \nthe requirements set forth in Appendix C, Interconnection Details, of this LLIA.  \n9.4 \nReactive Power and Primary Frequency Response.  Large Load Interconnection \nCustomer will design the Large Load Facility and Behind-the-Meter facility to maintain a \ncomposite power factor within the range of 0.99 leading to 0.97 lagging at the Point of \nInterconnection, unless the Participating TO established a different requirement that \napplies to all Large Loads connected to its system or the CAISO has establishes different \nrequirements that apply to all Large Loads in the CAISO Balancing Authority Area on a \ncomparable basis.    \n9.5 \nDisconnection from the Grid: The Participating TO will have the right to remotely \ndisconnect the Large Load Facility under conditions specific operation conditions \nidentified in the Large Load System Impact Study or under conditions where \ndisconnecting the Large Load Facility is required to maintain transmission system \nreliability and stability. \n9.6 \nOutages and Interruptions. \n9.6.1 Outages. \n9.6.1.1 Outage Authority and Coordination. Each Party may in accordance \nwith Good Utility Practice in coordination with the other Parties remove \nfrom service any of its respective Interconnection Facilities or Network \nUpgrades that may impact another Party’s facilities as necessary to \nperform maintenance or testing or to install or replace equipment. Absent \nan Emergency Condition, the Party scheduling a removal of such \nfacility(ies) from service will use Reasonable Efforts to schedule such \nremoval on a date and time mutually acceptable to all Parties. In all \ncircumstances any Party planning to remove such facility(ies) from service \nshall use Reasonable Efforts to minimize the effect on the other Parties of \nsuch removal. \n9.6.1.2 Outage Schedules. The Large Load Interconnection Customer Shall \nsubmit its planned facility maintenance schedules no less than thirty (30) \ndays in advance of the event.   \n9.6.1.3 Outage Restoration. If an outage on a Party’s Interconnection Facilities \nor Network Upgrades adversely affects another Party’s operations or \nfacilities, the Party that owns or controls the facility that is out of service \nshall use Reasonable Efforts to promptly restore such facility(ies) to a \nnormal operating condition consistent with the nature of the outage. The \nParty that owns or controls the facility that is out of service shall provide"},{"page":113,"startToken":42470,"endToken":42903,"text":"26 \nthe other Parties, to the extent such information is known, information on \nthe nature of the Emergency Condition, if the outage is caused by an \nEmergency Condition, an estimated time of restoration, and any corrective \nactions required. Initial verbal notice shall be followed up as soon as \npracticable with written notice explaining the nature of the outage, if \nrequested by a Party, which may be provided by e-mail or facsimile. \n9.6.2 Interruption of Service. If required by Good Utility Practice to do so, the \nParticipating TO may require the Large Load Interconnection Customer to interrupt \nor reduce its receipt of deliveries of electricity if such receipt of electricity could \nadversely affect the Participating TO’s ability to perform such activities as are \nnecessary to safely and reliably operate and maintain the Participating TO’s electric \nsystem. The following provisions shall apply to any interruption or reduction \npermitted under this Article 9.6.2: \n9.6.2.1 The interruption or reduction shall continue only for so long as reasonably \nnecessary under Good Utility Practice; \n9.6.2.2 Any such interruption or reduction shall be made on an equitable, non- \ndiscriminatory basis with respect to all load directly connected to the \nParticipating TO, subject to any conditions specified in this LLIA; \n9.6.2.3 When the interruption or reduction must be made under circumstances \nwhich do not allow for advance notice, the Participating TO shall notify \nthe Large Load Interconnection Customer by telephone as soon as \npracticable of the reasons for the curtailment, interruption, or reduction, \nand, if known, its expected duration. Telephone notification shall be \nfollowed by written notification, if requested by the Large Load \nInterconnection Customer, as soon as practicable; \n9.6.2.4 Except during the existence of an Emergency Condition, the Participating \nTO shall notify the Large Load Interconnection Customer in advance \nregarding the timing of such interruption or reduction and further notify \nthe Large Load Interconnection Customer of the expected duration. The \nParticipating TO shall coordinate with the Large Load Interconnection \nCustomer using Good Utility Practice to schedule the interruption or \nreduction during periods of least impact to the Large Load Interconnection \nCustomer, the CAISO, and the Participating TO; \n9.6.2.5 The Parties shall cooperate and coordinate with each other to the extent \nnecessary in order to restore the Large Load Facility, Interconnection \nFacilities, the Participating TO’s Transmission System, and the CAISO \nControlled Grid to their normal operating state, consistent with system \nconditions and Good Utility Practice. \n9.6.3 Under-Frequency and Over-Frequency Conditions. The Large Load \nInterconnection Customer shall implement under-frequency and over-frequency"},{"page":114,"startToken":42903,"endToken":43287,"text":"27 \nprotection set points for the Large Load Facility as required by Applicable \nReliability Standards and the Applicable Reliability Council to ensure “ride \nthrough” capability. Large Load Facility response to frequency deviations of pre-\ndetermined magnitudes, both under-frequency and over-frequency deviations, shall \nbe studied and coordinated with the Participating TO and the CAISO in accordance \nwith Good Utility Practice. The term “ride through” as used herein shall mean the \nability of a Generating Facility to stay connected to and synchronized with the \nCAISO Controlled Grid during system disturbances within a range of under-\nfrequency and over-frequency conditions, in accordance with Good Utility Practice. \nThe Large Load Interconnection Customer is required to satisfy all current and \nfuture frequency ride through requirement established by Western Electricity \nCoordinating Council or NERC. \n9.6.4 System Protection and Other Control Requirements. \n9.6.4.1 System Protection Facilities. The Large Load Interconnection Customer \nshall, at its expense, install, operate, and maintain System Protection \nFacilities as a part of the Large Load Facility or the Large Load \nInterconnection Customer’s Interconnection Facilities. The Participating \nTO shall install at the Large Load Interconnection Customer’s expense \nany System Protection Facilities that may be required on the Participating \nTO’s Interconnection Facilities or the Participating TO’s Transmission \nSystem as a result of the interconnection of the Large Load Facility and \nthe Large Load Interconnection Customer’s Interconnection Facilities. \n9.6.4.2 The Participating TO’s and Large Load Interconnection Customer’s \nprotection facilities shall be designed and coordinated with other systems \nin accordance with Applicable Reliability Standards, Applicable \nReliability Council criteria, and Good Utility Practice. \n9.6.4.3 The Participating TO and Large Load Interconnection Customer shall each \nbe responsible for protection of its facilities consistent with Good Utility \nPractice. \n9.6.4.4 The Participating TO’s and Large Load Interconnection Customer’s \nprotective relay design shall incorporate the necessary test switches to \nperform the tests required in Article 6. The required test switches will be \nplaced such that they allow operation of lockout relays while preventing \nbreaker failure schemes from operating and causing unnecessary breaker \noperations and/or the tripping of the Large Load Interconnection \nCustomer’s Large Load Facilities. \n9.6.4.5 The Participating TO and Large Load Interconnection Customer will test, \noperate and maintain System Protection Facilities in accordance with \nGood Utility Practice."},{"page":115,"startToken":43287,"endToken":43746,"text":"28 \n9.6.4.6 Prior to the In-Service Date, and again prior to the Commercial Operation \nDate, the Participating TO and Large Load Interconnection Customer or \ntheir agents shall perform a complete calibration test and functional trip \ntest of the System Protection Facilities. At intervals suggested by Good \nUtility Practice, the standards and procedures of the Participating TO, \nincluding, if applicable, the requirements of the Participating TO’s \nInterconnection Handbook, and following any apparent malfunction of the \nSystem Protection Facilities, each Party shall perform both calibration and \nfunctional trip tests of its System Protection Facilities. These tests do, \nhowever, require that all protective relays and lockout contacts be \nactivated. \n9.6.5 Requirements for Protection. In compliance with Good Utility Practice and, the \nLarge Load Interconnection Customer shall provide, install, own, and maintain \nrelays, circuit breakers and all other devices necessary to remove any fault \ncontribution of the Large Load Facility to any short circuit occurring on the \nParticipating TO’s Transmission System not otherwise isolated by the Participating \nTO’s equipment, such that the removal of the fault contribution shall be coordinated \nwith the protective requirements of the Participating TO’s Transmission System. \nSuch protective equipment shall include, without limitation, a disconnecting device \nwith fault current-interrupting capability located between the Large Load Facility \nand the Participating TO’s Transmission System at a site selected upon mutual \nagreement (not to be unreasonably withheld, conditioned or delayed) of the Parties. \nThe Large Load Interconnection Customer shall be responsible for protection of the \nLarge Load Facility and the Large Load Interconnection Customer’s other \nequipment from such conditions as negative sequence currents, over- or under-\nfrequency, sudden load rejection, over- or under-voltage, and generator loss-of-\nfield. The Large Load Interconnection Customer shall be solely responsible to \ndisconnect the Large Load Facility and the Large Load Interconnection Customer’s \nother equipment if conditions on the CAISO Controlled Grid could adversely affect \nthe Large Load Facility. \n9.6.6 Power Quality. Large Load Interconnection Customer’s facilities shall not cause \nexcessive voltage flicker nor introduce excessive voltage and harmonic distortion to \nthe sinusoidal voltage or current waves as defined by ANSI Standard C84.1-1989, \nin accordance with IEEE Standard 519, any applicable superseding electric industry \nstandard, or any alternative Applicable Reliability Standard or Applicable \nReliability Council standard. In the event of a conflict among ANSI Standard \nC84.1-1989, any applicable superseding electric industry standard, or any \nalternative Applicable Reliability Standard or Applicable Reliability Council \nstandard, the alternative Applicable Reliability Standard or Applicable Reliability \nCouncil standard shall control. \n9.7 \nSwitching and Tagging Rules. Each Party shall provide the other Parties a copy of its \nswitching and tagging rules that are applicable to the other Parties’ activities. Such \nswitching and tagging rules shall be developed on a non-discriminatory basis. The Parties"},{"page":116,"startToken":43746,"endToken":44171,"text":"29 \nshall comply with applicable switching and tagging rules, as amended from time to time, \nin obtaining clearances for work or for switching operations on equipment. \n9.8 \nUse of Interconnection Facilities by Third Parties. \n9.8.1 Purpose of Interconnection Facilities. Except as may be required by Applicable \nLaws and Regulations, or as otherwise agreed to among the Parties, the \nInterconnection Facilities shall be constructed for the sole purpose of \ninterconnecting the Large Load Facility to the Participating TO’s Transmission \nSystem and shall be used for no other purpose. \n9.8.2 Third Party Users. If required by Applicable Laws and Regulations or if the \nParties mutually agree, such agreement not to be unreasonably withheld, to allow \none or more third parties to use the Participating TO’s Interconnection Facilities, or \nany part thereof, the Large Load Interconnection Customer will be entitled to \ncompensation for the capital expenses it incurred in connection with the \nInterconnection Facilities based upon the pro rata use of the Interconnection \nFacilities by the Participating TO, all third party users, and the Large Load \nInterconnection Customer, in accordance with Applicable Laws and Regulations or \nupon some other mutually-agreed upon methodology. In addition, cost \nresponsibility for ongoing costs, including operation and maintenance costs \nassociated with the Interconnection Facilities, will be allocated between the Large \nLoad Interconnection Customer and any third party users based upon the pro rata \nuse of the Interconnection Facilities by the Participating TO, all third party users, \nand the Large Load Interconnection Customer, in accordance with Applicable Laws \nand Regulations or upon some other mutually agreed upon methodology. If the \nissue of such compensation or allocation cannot be resolved through such \nnegotiations, it shall be submitted to FERC for resolution. \n9.9 \nDisturbance Analysis Data Exchange. The Parties will cooperate with one another in \nthe analysis of disturbances to either the Large Load Facility or the Participating TO \nTransmission System by gathering and providing access to any information relating to \nany disturbance, including information from oscillography, protective relay targets, \nbreaker operations and sequence of events records, and any disturbance information \nrequired by Good Utility Practice. \nArticle 10. Maintenance \n10.1 \nParticipating TO Obligations. The Participating TO shall maintain the Participating \nTO’s Transmission System and the Participating TO’s Interconnection Facilities in a safe \nand reliable manner and in accordance with this LLIA. \n10.2 \nLarge Load Interconnection Customer Obligations. The Large Load Interconnection \nCustomer shall maintain the Large Load Facility and the Large Load Interconnection \nCustomer’s Interconnection Facilities in a safe and reliable manner and in accordance \nwith this LLIA."},{"page":117,"startToken":44171,"endToken":44611,"text":"30 \n10.3 \nCoordination. The Parties shall confer regularly to coordinate the planning, scheduling \nand performance of preventive and corrective maintenance on the Large Load Facility \nand the Interconnection Facilities. \n10.4 \nSecondary Systems. The Participating TO and Large Load Interconnection Customer \nshall cooperate with the other Parties in the inspection, maintenance, and testing of \ncontrol or power circuits that operate below 600 volts, AC or DC, including, but not \nlimited to, any hardware, control or protective devices, cables, conductors, electric \nraceways, secondary equipment panels, transducers, batteries, chargers, and voltage and \ncurrent transformers that directly affect the operation of a Party’s facilities and equipment \nwhich may reasonably be expected to impact the other Parties. Each Party shall provide \nadvance notice to the other Parties before undertaking any work on such circuits, \nespecially on electrical circuits involving circuit breaker trip and close contacts, current \ntransformers, or potential transformers. \n10.5 \nOperating and Maintenance Expenses. Subject to the provisions herein addressing the \nuse of facilities by others, and except for operations and maintenance expenses associated \nwith modifications made for providing interconnection or transmission service to a third \nparty and such third party pays for such expenses, the Large Load Interconnection \nCustomer shall be responsible for all reasonable expenses including overheads, \nassociated with: (1) owning, operating, maintaining, repairing, and replacing the Large \nLoad Interconnection Customer’s Interconnection Facilities; and (2) operation, \nmaintenance, repair, and replacement of the Participating TO’s Interconnection Facilities. \nArticle 11. Performance Obligation \n11.1 \nLarge Load Interconnection Customer’s Interconnection Facilities. The Large Load \nInterconnection Customer shall design, procure, construct, install, own and/or control the \nLarge Load Interconnection Customer’s Interconnection Facilities described in Appendix \nA and Appendix H at its sole expense. \n11.2 \nParticipating TO’s Interconnection Facilities. The Participating TO shall design, \nprocure, construct, install, own and/or control the Participating TO’s Interconnection \nFacilities described in Appendices A and H at the sole expense of the Large Load \nInterconnection Customer. Unless the Participating TO elects to fund the capital for the \nParticipating TO’s Interconnection Facilities, they shall be solely funded by the Large \nLoad Interconnection Customer. \n11.3 \nNetwork Upgrades and Distribution Upgrades. The Participating TO shall design, \nprocure, construct, install, and own the Network Upgrades and Distribution Upgrades \ndescribed in Appendix A and Appendix H.  The Large Load Interconnection Customer \nshall be responsible for all costs related to Distribution Upgrades. Network Upgrades \nshall be funded by the Large Load Interconnection Customer, and the Large Load \nInterconnection Customer shall bear the risk of, and be ultimately responsible for, the \ncosts incurred to provide the Interconnection Service requested, including the costs of \nNetwork Upgrades, in accordance with this Article 11.3."},{"page":118,"startToken":44611,"endToken":45084,"text":"31 \n11.3.1 Reimbursement for Network Upgrades.  The Large Load Interconnection \nCustomer shall be reimbursed in accordance with this Article 11.3.1 for amounts \npaid to the Participating TO for any Network Upgrade identified in Appendix A that \nhas a cost of $10,000,000 or more (each, a “Reimbursable Network Upgrade”). \nReimbursement for Reimbursable Network Upgrades placed in service on or before \nthe Commercial Operation Date of the Large Load Facility shall commence upon \nthe Commercial Operation Date. Reimbursement for each Reimbursable Network \nUpgrade placed in service after the Commercial Operation Date shall commence no \nlater ninety (90) Calendar Days after such Network Upgrade is placed in service (as \napplicable, the “Reimbursement Commencement Date”). Subject to this Article \n11.3, a reimbursement amount shall become fully and finally payable to the Large \nLoad Interconnection Customer only when (x) such Network Upgrades have \nachieved Commercial Operation, (y) the Large Load Facility has achieved \nCommercial Operation and (z) the Large Load Interconnection Customer is not in \nDefault under this LLIA (collectively, the “Final Payment Conditions”).  \nParticipating TO shall collect the cost of these facilities through its Transmission \nRevenue Requirement. \n11.3.2 Repayment of Amounts Advanced for Network Upgrades. \n11.3.2.1 \nRepayment Schedule. Any repayment amount provided pursuant \nto Article 11.3.1 shall include any tax gross-up or other tax-related \npayments associated with Network Upgrades not refunded to the \nLarge Load Interconnection Customer pursuant to Article 5 or \notherwise, and shall be paid to the Large Load Interconnection \nCustomer by the Participating TO on a dollar-for-dollar basis \neither through: (1) direct payments made on a levelized basis over \na period of years, which shall be not less than five (5) years nor \nmore than twenty (20) years, commencing on the applicable \nReimbursement Commencement Date (the “Repayment Period”); \nor (2) any alternative payment schedule that is mutually agreeable \nto the Large Load Interconnection Customer and Participating TO, \nprovided that such amount is paid within the Repayment Period, in \neach case subject to Article 11.3.2.4. The unpaid balance of any \nrepayment amount outstanding from time to time shall accrue \ninterest at the rate calculated in accordance with the methodology \nset forth in FERC’s regulations at 18 C.F.R. §35.19a(a)(2)(iii), and \nsuch interest shall be paid together with each installment. \nNotwithstanding the foregoing, if this LLIA terminates before the \nend of the applicable Repayment Period, the Participating TO’s \nobligation to pay refunds to the Large Load Interconnection \nCustomer shall cease as of the date of termination. \n11.3.2.2 \nInterest Payments and Assignment Rights. Any repayment shall \ninclude interest calculated in accordance with the methodology set \nforth in FERC’s regulations at 18 C.F.R. §35.19a(a)(2)(iii) from \nthe date of any payment for Network Upgrades through the date on"},{"page":119,"startToken":45084,"endToken":45482,"text":"32 \nwhich the Large Load Interconnection Customer receives a \nrepayment of such payment. Interest shall continue to accrue on \nthe repayment obligation so long as this LLIA is in effect. The \nLarge Load Interconnection Customer may assign such repayment \nrights to any entity. \n11.3.2.3 \nFailure to Achieve Commercial Operation. If the Large Load \nFacility fails to achieve Commercial Operation, but it or another \nLarge Load Facility is later constructed, achieves Commercial \nOperation and makes use of the Network Upgrades, the \nParticipating TO shall at that time reimburse Large Load \nInterconnection Customer for the amounts advanced for the \nNetwork Upgrades, provided that, notwithstanding Article \n11.3.2.2, interest on such reimbursement shall not incur interest \nfrom the time the Large Load Facility that paid for the Network \nUpgrades fails to achieve Commercial Operation and, in the \nParticipating TO’s reasonable discretion, will not be able to \nachieve Commercial Operation until the later Large Load Facility \nachieves Commercial Operation. Before any such reimbursement \ncan occur, the Large Load Interconnection Customer, or the entity \nthat ultimately constructs the Large Load Facility, if different, is \nresponsible for identifying and demonstrating to the Participating \nTO the appropriate entity to which reimbursement must be made in \norder to implement the intent of this reimbursement obligation. \n11.3.2.4 \nAccelerated Reimbursement Against Reimbursement Security. \nAs a condition precedent to receiving any Reimbursement, the \nLarge Load Interconnection Customer shall provide, and thereafter \nmaintain until released under this Article 11.3.2.4, credit support in \na form acceptable to Participating TO and from an issuer \nreasonably acceptable to the Participating TO (the \n“Reimbursement Security”) in an amount equal to: (i) initially, an \namount equal to the anticipated first Reimbursement payment \n(based on the amount of the Network Upgrades divided by the \nyears in the Repayment Period); and (ii) thereafter, the aggregate \namount of all Reimbursements received by the Large Load \nInterconnection Customer plus the amounts for the operation and \nmaintenance of the Network Upgrades to date, for a period of five \n(5) years from the Participating TO’s receipt of such \nReimbursement Security.  The Reimbursement Security shall \nsecure the Large Load Interconnection Customer’s obligation to \npay the Participating TO, within thirty (30) Calendar Days of \ninvoice, any amount by which Participating TO is not able to \ncollect relating to the full cost of a Reimbursable Network Upgrade \nin Participating TO’s Transmission Revenue Requirement"},{"page":120,"startToken":45482,"endToken":45914,"text":"33 \nIn addition, the Large Load Interconnection Customer may elect, \nby written notice to the Participating TO, to receive reimbursement \namounts for Reimbursable Network Upgrades for which it has \nmade payment before such amounts have become fully and finally \npayable under Article 11.3.1 and Article 11.3.2.1 (each such \npayment, an “Accelerated Reimbursement”).  In order to receive \nsuch Accelerated Reimbursement, the Large Load Interconnection \nCustomer shall post Reimbursement Security.  Prior to receipt of \neach additional Accelerated Reimbursement before the \nCommercial Operation Date, the Large Load Interconnection \nCustomer shall increase the Reimbursement Security by the \namount of such additional Accelerated Reimbursement, such that \nthe Reimbursement Security at all times through the Commercial \nOperation Date is not less than the cumulative Accelerated \nReimbursements received.   \n \nThe Participating TO shall pay each Reimbursement and \nAccelerated Reimbursement, as applicable, within thirty (30) \nCalendar Days after its receipt of the required Reimbursement \nSecurity, and no interest shall accrue under Article 11.3.2.1 or \nArticle 11.3.2.2 on any amount from and after the date it is paid.   \nIf (a) the Final Payment Conditions are not satisfied with respect to \nany portion of an Accelerated Reimbursement, or (b) this LLIA  \nterminates before any portion of an Accelerated Reimbursement \nhas become fully and finally payable, the Large Load \nInterconnection Customer shall repay such portion to the \nParticipating TO, together with interest calculated in accordance \nwith 18 C.F.R. §35.19a(a)(2)(iii) from the date of the Accelerated \nReimbursement, within thirty (30) Calendar Days of invoice. If the \nLarge Load Interconnection Customer fails to timely make any \nsuch repayment, or fails to renew or replace the Reimbursement \nSecurity at least thirty (30) Calendar Days before its expiration or \nto replenish it within five (5) Business Days after any draw, the \nParticipating TO may draw upon the Reimbursement Security in \nthe amount of the unpaid repayment obligation or, in the case of a \nfailure to renew, replace, or replenish, in the full amount of the \nthen-outstanding Reimbursements, and hold any cash proceeds as \nsecurity for such obligation. Any portion of an Accelerated \nReimbursement repaid or recovered by the Participating TO shall \nremain eligible for reimbursement in accordance with this Article \n11.3 when it becomes fully and finally payable. \n \n11.3.3 Special Provisions for Affected Systems. The Large Load Interconnection \nCustomer shall enter into an agreement with the owner of the Affected System \nand/or other affected owners of portions of the CAISO Controlled Grid, as \napplicable, in accordance with this Article 11.3.3. Such agreement shall specify the"},{"page":121,"startToken":45914,"endToken":46432,"text":"34 \nterms governing payments to be made by the Large Load Interconnection Customer \nto the owner of the Affected System and/or other affected owners of portions of the \nCAISO Controlled Grid as well as the repayment by the owner of the Affected \nSystem and/or other affected owners of portions of the CAISO Controlled Grid. In \nno event shall the Participating TO be responsible for the repayment for any \nfacilities that are not part of the Participating TO’s Transmission System. In the \nevent the Participating TO is a joint owner with an Affected System or with any \nother co-owner of a facility affected by the Large Load Facility, the Participating \nTO’s obligation to reimburse the Large Load Interconnection Customer for \npayments made to address the impacts of the Large Load Facility on the system \nshall not exceed the proportionate amount of the cost of any upgrades attributable to \nthe proportion of the jointly-owned facility owned by the Participating TO. \n11.4 \nProvision of Interconnection Financial Security. The Large Load Interconnection \nCustomer is obligated to provide all necessary Interconnection Financial Security \nrequired under Attachment 4 to the LLIP in a manner acceptable under Attachment 4. \nFailure by the Large Load Interconnection Customer to timely satisfy the terms and \nconditions set forth in Attachment 4 to the LLIP for the provision of Interconnection \nFinancial Security shall be deemed a Breach of this Agreement and a condition of Default \nof this Agreement. \n11.4.1 Notwithstanding any other provision of this Agreement for notice of Default and \nopportunity to cure such Default, the Participating TO shall provide the Large Load \nInterconnection Customer with written notice of any Default due to timely failure to \npost Interconnection Financial Security, and the Large Load Interconnection \nCustomer shall have five (5) Business Days from the date of such notice to cure \nsuch Default by posting the required Interconnection Financial Security. If the \nLarge Load Interconnection Customer fails to cure the Default, then this Agreement \nshall be deemed terminated. \nArticle 12. Invoice \n12.1 \nGeneral. The Participating TO shall submit to the Large Load Interconnection Customer, \non a monthly basis, invoices of amounts due pursuant to this LLIA for the preceding \nmonth. Each invoice shall state the month to which the invoice applies and fully describe \nthe services and equipment provided. The Parties may discharge mutual debts and \npayment obligations due and owing to each other on the same date through netting, in \nwhich case all amounts a Party owes to the other Party under this LLIA, including \ninterest payments or credits, shall be netted so that only the net amount remaining due \nshall be paid by the owing Party.   \n12.2 \nFinal Invoice. As soon as reasonably practicable, but within twelve (12) months after \ncompletion of the construction of the Participating TO’s Interconnection Facilities, \nNetwork Upgrades, and Distribution Upgrades, the Participating TO shall provide an \ninvoice of the final cost of the construction of the Participating TO’s Interconnection \nFacilities, Network Upgrades, and Distribution Upgrades, and shall set forth such costs in \nsufficient detail to enable the Large Load Interconnection Customer to compare the actual"},{"page":122,"startToken":46432,"endToken":46964,"text":"35 \ncosts with the estimates and to ascertain deviations, if any, from the cost estimates. With \nrespect to costs associated with the Participating TO’s Interconnection Facilities and \nDistribution Upgrades, the Participating TO shall refund to the Large Load \nInterconnection Customer any amount by which the actual payment by the Large Load \nInterconnection Customer for estimated costs exceeds the actual costs of construction \nwithin thirty (30) Calendar Days of the issuance of such final construction invoice; or, in \nthe event the actual costs of construction exceed the Large Load Interconnection \nCustomer’s actual payment for estimated costs, then the Large Load Interconnection \nCustomer shall pay to the Participating TO any amount by which the actual costs of \nconstruction exceed the actual payment by the Large Load Interconnection Customer for \nestimated costs within thirty (30) Calendar Days of the issuance of such final \nconstruction invoice. With respect to costs associated with Network Upgrades, the \nParticipating TO shall refund to the Large Load Interconnection Customer any amount by \nwhich the actual payment by the Large Load Interconnection Customer for estimated \ncosts exceeds the actual costs of construction multiplied by the Large Load \nInterconnection Customer’s percentage share of those costs, as set forth in Appendix G to \nthis LLIA within thirty (30) Calendar Days of the issuance of such final construction \ninvoice. In the event the actual costs of construction multiplied by the Large Load \nInterconnection Customer’s percentage share of those costs exceed the Large Load \nInterconnection Customer’s actual payment for estimated costs, then the Participating TO \nshall recover such difference through its transmission service rates. \n12.3 \nPayment. Invoices shall be rendered to the Large Load Interconnection Customer at the \naddress specified in Appendix F. The Large Load Interconnection Customer shall pay, or \nParticipating TO shall refund, the amounts due within thirty (30) Calendar Days of the \nLarge Load Interconnection Customer’s receipt of the invoice. All payments shall be \nmade in immediately available funds payable to the Large Load Interconnection \nCustomer or Participating TO, or by wire transfer to a bank named and account \ndesignated by the invoicing Large Load Interconnection Customer or Participating TO. \nPayment of invoices by any Party will not constitute a waiver of any rights or claims any \nParty may have under this LLIA. \n12.4 \nDisputes. In the event of a billing dispute between the Large Load Interconnection \nCustomer and the Participating TO, the Participating TO shall continue to provide \nInterconnection Service under this LLIA as long as the Large Load Interconnection \nCustomer: (i) continues to make all payments not in dispute; and (ii) pays to the \nParticipating TO or into an independent escrow account the portion of the invoice in \ndispute, pending resolution of such dispute. If the Large Load Interconnection Customer \nfails to meet these two requirements for continuation of service, then the Participating TO \nmay provide notice to the Large Load Interconnection Customer of a Default pursuant to \nArticle 17. Within thirty (30) Calendar Days after the resolution of the dispute, the Party \nthat owes money to the other Party shall pay the amount due with interest calculated in \naccordance with the methodology set forth in FERC’s Regulations at 18 C.F.R. § \n35.19a(a)(2)(iii)."},{"page":123,"startToken":46964,"endToken":47406,"text":"36 \nArticle 13. Emergencies \n13.1 \n[Reserved] \n13.2 \nObligations. Each Party shall comply with the Emergency Condition procedures of the \nCAISO, NERC, the Applicable Reliability Council, Applicable Reliability Standards, \nApplicable Laws and Regulations, Applicable Reliability Coordinators requirements, and \nany emergency procedures set forth in this LLIA or provided by the Participating TO. \n13.3 \nNotice. The Participating TO shall notify the Large Load Interconnection Customer \npromptly when it becomes aware of an Emergency Condition that affects the \nParticipating TO’s Interconnection Facilities or Distribution System or the CAISO \nControlled Grid, respectively, that may reasonably be expected to affect the Large Load \nInterconnection Customer’s operation of the Large Load Facility or the Large Load \nInterconnection Customer’s Interconnection Facilities. The Large Load Interconnection \nCustomer shall notify the Participating TO and, as applicable, the CAISO promptly when \nit becomes aware of an Emergency Condition that affects the Large Load Facility or the \nLarge Load Interconnection Customer’s Interconnection Facilities that may reasonably be \nexpected to affect the CAISO Controlled Grid or the Participating TO’s Interconnection \nFacilities. To the extent information is known, the notification shall describe the \nEmergency Condition, the extent of the damage or deficiency, the expected effect on the \noperation of the Large Load Interconnection Customer’s or Participating TO’s facilities \nand operations, its anticipated duration and the corrective action taken and/or to be taken. \nThe initial notice shall be followed as soon as practicable with written notice, if requested \nby a Party, which may be provided by electronic mail or facsimile. \n13.4 \nImmediate Action. Unless, in the Large Load Interconnection Customer’s reasonable \njudgment, immediate action is required, the Large Load Interconnection Customer shall \nobtain the consent of the Participating TO, such consent to not be unreasonably withheld, \nprior to performing any manual switching operations at the Large Load Facility or the \nLarge Load Interconnection Customer’s Interconnection Facilities in response to an \nEmergency Condition declared by the Participating TO in response to any other \nemergency condition. \n13.5 \nParticipating TO Authority. \n13.5.1 General. The Participating TO may take whatever actions or inactions, including \nissuance of dispatch instructions, with regard to Participating TO’s Interconnection \nFacilities or Distribution System they deem necessary during an Emergency \nCondition in order to: (i) preserve public health and safety; (ii) preserve the \nreliability of the Participating TO’s Transmission System and/or the Participating \nTO’s Interconnection Facilities or Distribution System; (iii) limit or prevent \ndamage; and (iv) expedite restoration of service. \nThe Participating TO shall use Reasonable Efforts to minimize the effect of such \nactions or inactions on the Large Load Facility or the Large Load Interconnection \nCustomer’s Interconnection Facilities. The Participating TO may, on the basis of"},{"page":124,"startToken":47406,"endToken":47888,"text":"37 \ntechnical considerations, require the Large Load Facility to mitigate an \nEmergency Condition by taking actions necessary and limited in scope to remedy \nthe Emergency Condition, including, but not limited to, directing the Large Load \nInterconnection Customer to shut-down, implementing a reduction or \ndisconnection pursuant to Article 13.5.2; or altering the outage schedules of the \nLarge Load Facility and the Large Load Interconnection Customer’s \nInterconnection Facilities.  \n13.5.2 Reduction and Disconnection. The Participating TO may reduce Interconnection \nService or disconnect the Large Load Facility or the Large Load Interconnection \nCustomer’s Interconnection Facilities when such reduction or disconnection is \nnecessary under Good Utility Practice due to Emergency Conditions and/or under \ncertain abnormal operating conditions to maintain the reliability of the transmission \nnetwork. When the Participating TO can schedule the reduction or disconnection in \nadvance, the Participating TO shall notify the Large Load Interconnection Customer \nof the reasons, timing and expected duration of the reduction or disconnection. The \nParticipating TO shall coordinate with the Large Load Interconnection Customer \nusing Good Utility Practice to schedule the reduction or disconnection during \nperiods of least impact to the Large Load Interconnection Customer and the \nParticipating TO. Any reduction or disconnection shall continue only for so long as \nreasonably necessary under Good Utility Practice. The Parties shall cooperate with \neach other to restore the Large Load Facility, the Interconnection Facilities, and the \nParticipating TO’s Transmission System to their normal operating state as soon as \npracticable consistent with Good Utility Practice. \n13.6 \nLarge Load Interconnection Customer Authority. Consistent with Good Utility \nPractice and this LLIA, the Large Load Interconnection Customer may take actions or \ninactions with regard to the Large Load Facility or the Large Load Interconnection \nCustomer’s Interconnection Facilities during an Emergency Condition in order to: (i) \npreserve public health and safety; (ii) preserve the reliability of the Large Load Facility or \nthe Large Load Interconnection Customer’s Interconnection Facilities; (iii) limit or \nprevent damage; and (iv) expedite restoration of service. Large Load Interconnection \nCustomer shall use Reasonable Efforts to minimize the effect of such actions or inactions \non the Participating TO’s Transmission System and the Participating TO’s \nInterconnection Facilities. The Participating TO shall use Reasonable Efforts to assist \nLarge Load Interconnection Customer in such actions. \n13.7 \nLimited Liability. Except as otherwise provided in this LLIA, no Party shall be liable to \nany other Party for any action it takes in responding to an Emergency Condition so long \nas such action is made in good faith and is consistent with Good Utility Practice. \nArticle 14. Regulatory Requirements and Governing Laws \n14.1 \nRegulatory Requirements. Each Party’s obligations under this LLIA shall be subject to \nits receipt of any required approval or certificate from one or more Governmental \nAuthorities in the form and substance satisfactory to the applying Party, or the Party \nmaking any required filings with, or providing notice to, such Governmental Authority,"},{"page":125,"startToken":47888,"endToken":48337,"text":"38 \nand the expiration of any time period associated therewith. Each Party shall in good faith \nseek and use its Reasonable Efforts to obtain such other approvals. Nothing in this LLIA \nshall require the Large Load Interconnection Customer to take any action that could \nresult in its inability to obtain, or its loss of, status or exemption under the Federal Power \nAct or the Public Utility Holding Company Act of 1935, as amended, or the Public \nUtility Regulatory Policies Act of 1978, or the Energy Policy Act of 2005. \n14.2 \nGoverning Law. \n14.2.1 The validity, interpretation and performance of this LLIA and each of its provisions \nshall be governed by the laws of the state where the Point of Interconnection is \nlocated, without regard to its conflicts of law principles. \n14.2.2 This LLIA is subject to all Applicable Laws and Regulations. \n14.2.3 Each Party expressly reserves the right to seek changes in, appeal, or otherwise \ncontest any laws, orders, rules, or regulations of a Governmental Authority. \nArticle 15. Notices \n15.1 \nGeneral. Unless otherwise provided in this LLIA, any notice, demand or request required \nor permitted to be given by a Party to another and any instrument required or permitted to \nbe tendered or delivered by a Party in writing to another shall be effective when delivered \nand may be so given, tendered or delivered, by recognized national courier, conveyed by \ne-mail, or by depositing the same with the United States Postal Service with postage \nprepaid, for delivery by certified or registered mail, addressed to the Party, or personally \ndelivered to the Party, at the address set out in Appendix F, Addresses for Delivery of \nNotices and Billings. \nA Party must update the information in Appendix F as information changes. A Party may \nchange the notice information in this LLIA by giving five (5) Business Days written \nnotice prior to the effective date of the change. Such changes shall not constitute an \namendment to this LLIA. \n15.2 \nBillings and Payments. Billings and payments shall be sent to the addresses set out in \nAppendix F. \n15.3 \nAlternative Forms of Notice. Any notice or request required or permitted to be given by \na Party to another and not required by this LLIA to be given as provided in Article 15.1 \nmay be so given by telephone, or e-mail to the telephone numbers and e-mail addresses \nset out in Appendix F. \n15.4 \nOperations and Maintenance Notice. Each Party shall notify the other Parties in writing \nof the identity of the person(s) that it designates as the point(s) of contact with respect to \nthe implementation of Articles 9 and 10."},{"page":126,"startToken":48337,"endToken":48812,"text":"39 \nArticle 16. Force Majeure \n16.1 \nForce Majeure. \n16.1.1 Economic hardship is not considered a Force Majeure event. \n16.1.2 No Party shall be considered to be in Default with respect to any obligation \nhereunder, (including obligations under Article 4), other than the obligation to pay \nmoney when due, if prevented from fulfilling such obligation by Force Majeure. A \nParty unable to fulfill any obligation hereunder (other than an obligation to pay \nmoney when due) by reason of Force Majeure shall give notice and the full \nparticulars of such Force Majeure to the other Party in writing or by telephone as \nsoon as reasonably possible after the occurrence of the cause relied upon. \nTelephone notices given pursuant to this Article shall be confirmed in writing as \nsoon as reasonably possible and shall specifically state full particulars of the Force \nMajeure, the time and date when the Force Majeure occurred and when the Force \nMajeure is reasonably expected to cease. The Party affected shall exercise due \ndiligence to remove such disability with reasonable dispatch, but shall not be \nrequired to accede or agree to any provision not satisfactory to it to settle and \nterminate a strike or other labor disturbance. \nArticle 17. Default \n17.1 \nDefault. \n17.1.1 General. No Default shall exist where such failure to discharge an obligation (other \nthan the payment of money) is the result of Force Majeure as defined in this LLIA \nor the result of an act or omission of the other Party. Upon a Breach, the affected \nnon-Breaching Party(ies) shall give written notice of such Breach to the Breaching \nParty. Except as otherwise provided herein, the Breaching Party shall have thirty \n(30) Calendar Days from receipt of the Default notice within which to cure such \nBreach; provided however, if such Breach is not capable of cure within thirty (30) \nCalendar Days, the Breaching Party shall commence such cure within thirty (30) \nCalendar Days after notice and continuously and diligently complete such cure \nwithin ninety (90) Calendar Days from receipt of the Default notice; and, if cured \nwithin such time, the Breach specified in such notice shall cease to exist. \n17.1.2 Right to Terminate. If a Breach is not cured as provided in this Article, or if a \nBreach is not capable of being cured within the period provided for herein, the \naffected non-Breaching Party(ies) shall have the right to declare a Default and \nterminate this LLIA by written notice at any time until cure occurs, and be relieved \nof any further obligation hereunder and, whether or not such Party(ies) terminates \nthis LLIA, to recover from the Breaching Party all amounts due hereunder, plus all \nother damages and remedies to which it is entitled at law or in equity. The \nprovisions of this Article will survive termination of this LLIA."},{"page":127,"startToken":48812,"endToken":49312,"text":"40 \nArticle 18. Indemnity, Consequential Damages, and Insurance \n18.1 \nIndemnity. Each Party (the “Indemnifying Party”) shall at all times indemnify, defend, \nand hold the other Parties (“Indemnified Party”) harmless from, any and all Losses \narising out of or resulting from another Party’s action or inactions of its obligations under \nthis LLIA on behalf of the indemnifying Party, except in cases of gross negligence or \nintentional wrongdoing by the Indemnified Party. \n18.1.1 Indemnified Party. If an Indemnified Party is entitled to indemnification under this \nArticle 18 as a result of a claim by a third party, and the Indemnifying Party fails, \nafter notice and reasonable opportunity to proceed under Article 18.1, to assume the \ndefense of such claim, such Indemnified Party may at the expense of the \nIndemnifying Party contest, settle or consent to the entry of any judgment with \nrespect to, or pay in full, such claim. \n18.1.2 Indemnifying Party. If an Indemnifying Party is obligated to indemnify and hold \nany Indemnified Party harmless under this Article 18, the amount owing to the \nIndemnified Party shall be the amount of such Indemnified Party’s actual Loss, net \nof any insurance or other recovery. \n18.1.3 Indemnity Procedures. Promptly after receipt by an Indemnified Party of any \nclaim or notice of the commencement of any action or administrative or legal \nproceeding or investigation as to which the indemnity provided for in Article 18.1 \nmay apply, the Indemnified Party shall notify the Indemnifying Party of such fact. \nAny failure of or delay in such notification shall not affect a Party’s indemnification \nobligation unless such failure or delay is materially prejudicial to the indemnifying \nParty. \nThe Indemnifying Party shall have the right to assume the defense thereof with \ncounsel designated by such Indemnifying Party and reasonably satisfactory to the \nIndemnified Party. If the defendants in any such action include one or more \nIndemnified Parties and the Indemnifying Party and if the Indemnified Party \nreasonably concludes that there may be legal defenses available to it and/or other \nIndemnified Parties which are different from or additional to those available to the \nIndemnifying Party, the Indemnified Party shall have the right to select separate \ncounsel to assert such legal defenses and to otherwise participate in the defense of \nsuch action on its own behalf. In such instances, the Indemnifying Party shall only \nbe required to pay the fees and expenses of one additional attorney to represent an \nIndemnified Party or Indemnified Parties having such differing or additional legal \ndefenses. \nThe Indemnified Party shall be entitled, at its expense, to participate in any such \naction, suit or proceeding, the defense of which has been assumed by the \nIndemnifying Party. Notwithstanding the foregoing, the Indemnifying Party: (i) \nshall not be entitled to assume and control the defense of any such action, suit or \nproceedings if and to the extent that, in the opinion of the Indemnified Party and \nits counsel, such action, suit or proceeding involves the potential imposition of"},{"page":128,"startToken":49312,"endToken":49845,"text":"41 \ncriminal liability on the Indemnified Party, or there exists a conflict or adversity \nof interest between the Indemnified Party and the Indemnifying Party, in such \nevent the Indemnifying Party shall pay the reasonable expenses of the \nIndemnified Party; and (ii) shall not settle or consent to the entry of any judgment \nin any action, suit or proceeding without the consent of the Indemnified Party, \nwhich shall not be unreasonably withheld, conditioned or delayed. \n18.2 \nConsequential Damages. Other than the liquidated damages heretofore described in \nArticle 5.2, in no event shall any Party be liable under any provision of this LLIA for any \nlosses, damages, costs or expenses for any special, indirect, incidental, consequential, or \npunitive damages, including but not limited to loss of profit or revenue, loss of the use of \nequipment, cost of capital, cost of temporary equipment or services, whether based in \nwhole or in part in contract, in tort, including negligence, strict liability, or any other \ntheory of liability; provided, however, that damages for which a Party may be liable to \nanother Party under another agreement will not be considered to be special, indirect, \nincidental, or consequential damages hereunder. \n18.3 \nInsurance. As indicated below, the designated Party shall, at its own expense, maintain \nin force throughout the periods noted in this LLIA, and until released by the other Parties, \nthe following minimum insurance coverages, with insurers rated no less than A- (with a \nminimum size rating of VII) by Bests’ Insurance Guide and Key Ratings and authorized \nto do business in the state where the Point of Interconnection is located, except in the \ncase of any insurance required to be carried by the CAISO, the State of California: \n18.3.1 Workers’ Compensation Insurance and Employers’ Liability. The Participating \nTO and the Large Load Interconnection Customer shall maintain such coverage \nfrom the commencement of any construction activities providing statutory benefits \nfor Workers Compensation coverage and coverage amounts of no less than One \nMillion Dollars ($1,000,000) for employer’s liability for each employee for bodily \ninjury by accident and One Million Dollars ($1,000,000) for each employee for \nbodily injury by disease in accordance with the laws and regulations of the state in \nwhich the Point of Interconnection is located. The Participating TO shall provide \nthe Large Load Interconnection Customer with evidence of such insurance coverage \nwithin thirty (30) Calendar Days of any request by the Large Load Interconnection \nCustomer. The Large Load Interconnection Customer shall provide evidence of \nsuch insurance thirty (30) Calendar Days prior to entry by any employee or \ncontractor or other person acting on the Large Load Interconnection Customer’s \nbehalf onto any construction site to perform any work related to the Interconnection \nFacilities or Large Load Facility. \n18.3.2 Commercial General Liability Insurance. The Participating TO and the Large \nLoad Interconnection Customer shall maintain commercial general liability \ninsurance coverage commencing within thirty (30) Calendar Days of the Effective \nDate of this LLIA, including coverage for premises and operations, bodily injury \n(including death), personal injury, property damage, products and completed \noperations coverage, coverage for explosion, collapse and underground hazards, \nindependent contractors coverage, and (i) liability of Participating TO and the Large"},{"page":129,"startToken":49845,"endToken":50362,"text":"42 \nLoad Interconnection Customer that would be imposed without the LLIA, or (ii) \nliability assumed by the Participating TO and the Large Load Interconnection \nCustomer in a contract or agreement that is an “insured contract” under commercial \ngeneral liability insurance policy. Such insurance shall include no cross-liability \nexclusions or separation of insured clause endorsement exclusions, with minimum \nlimits of One Million Dollars ($1,000,000) per occurrence/One Million Dollars \n($1,000,000) aggregate. If the activities of the Large Load Interconnection \nCustomer are being conducted through the actions of an Affiliate, then the Large \nLoad Interconnection Customer may satisfy the insurance requirements of this \nArticle 18.3.2 by providing evidence of insurance coverage carried by such Affiliate \nand showing the Participating TO and, as applicable, the CAISO as an additional \ninsured only with respect to the LLIA, together with the Large Load \nInterconnection Customer’s written representation to the Participating TO and, as \napplicable, the CAISO that the insured Affiliate is conducting all of the necessary \npre-construction work. Within thirty (30) Calendar Days prior to the entry of any \nperson on behalf of the Large Load Interconnection Customer onto any construction \nsite to perform work related to the Interconnection Facilities or Large Load Facility, \nthe Large Load Interconnection Customer shall replace any evidence of affiliate \ninsurance with evidence of such insurance carried by the Large Load \nInterconnection Customer, naming the Participating TO and, as applicable, the \nCAISO as additional insured only with respect to the LLIA. \n18.3.3 Business Automobile Liability Insurance. Prior to the entry of any such vehicles \non any construction site in connection with work done by or on behalf of the Large \nLoad Interconnection Customer, the Large Load Interconnection Customer shall \nprovide evidence of coverage of owned and non-owned and hired vehicles, trailers \nor semi-trailers designed for travel on public roads, with a minimum, combined \nsingle limit of One Million Dollars ($1,000,000) per occurrence for bodily injury, \nincluding death, and property damage. The Large Load Interconnection Customer \nshall include the Participating TO and, as applicable, the CAISO as additional \ninsured with respect to the LLIA on any such policies. \n18.3.4 Excess Liability Insurance. Commencing at the time of entry of any person on its \nbehalf upon any construction site for the Network Upgrades, Interconnection \nFacilities, or Large Load Facility, the Participating TO and the Large Load \nInterconnection Customer shall maintain Excess Liability insurance over and above \nthe Employer’s Liability Commercial General Liability and Business Automobile \nLiability Insurance coverage, with a minimum limit of Twenty Million Dollars \n($20,000,000) per occurrence/Twenty Million Dollars ($20,000,000) aggregate. \nSuch insurance carried by the Participating TO shall include the Large Load \nInterconnection Customer and, as applicable, the CAISO as additional insured with \nrespect to the LLIA, and such insurance carried by the Large Load Interconnection \nCustomer shall include the Participating TO and, as applicable, the CAISO as an \nadditional insured with respect to the LLIA. The requirements of Articles 18.3.2 \nand 18.3.4 may be met by any combination of general and excess liability \ninsurance."},{"page":130,"startToken":50362,"endToken":50843,"text":"43 \n18.3.5 The Commercial General Liability Insurance, Business Automobile Liability \nInsurance and Excess Liability Insurance policies shall include the other Parties \nidentified in the articles above, their parents, their subsidiaries, respective directors, \nofficers, agents, servants and employees (“Other Party Group”) and, as applicable, \nthe CAISO as additional insured. All policies shall contain provisions whereby the \ninsurers waive all rights of subrogation in accordance with the provisions of this \nLLIA against the Other Party Group. If any Party can reasonably demonstrate that \ncoverage policies containing provisions for insurer waiver of subrogation rights, or \nadvance notice are not commercially available, then the Parties shall meet and \nconfer and mutually determine to: (i) establish replacement or equivalent terms in \nlieu of subrogation or notice; or (ii) waive the requirements that coverage(s) include \nsuch subrogation provision or require advance written notice from such insurers. \n18.3.6 The Commercial General Liability Insurance, Business Automobile Liability \nInsurance and Excess Liability Insurance policies shall contain provisions that \nspecify that the policies are primary and non-contributory. Each Party shall be \nresponsible for its respective deductibles or self-insured retentions. \n18.3.7 The Commercial General Liability Insurance, Business Automobile Liability \nInsurance and Excess Liability Insurance policies, if written on a claims first made \nbasis, shall be maintained in full force and effect for two (2) years after termination \nof this LLIA, which coverage may be in the form of extended reporting period \ncoverage if agreed by the Parties. \n18.3.8 [Not Used.] \n18.3.9 Thirty (30) Calendar Days prior to the start of any work at the construction site \nrelated to Interconnection Facilities or Large Load Facility under this LLIA, and as \nsoon as practicable after the end of each fiscal year or at the renewal of the \ninsurance policy and in any event within ninety (90) Calendar Days thereafter, the \nParticipating TO and the Large Load Interconnection Customer shall provide a \ncertificate of insurance for all insurance required in this LLIA, executed by each \ninsurer or by an authorized representative of each insurer. \n18.3.10 Notwithstanding the foregoing, each Party may self-insure: \n(a) \nto meet the minimum insurance requirements of Article 18.3.1, to the extent that it \nmaintains a self-insurance program that is a qualified self-insurer within the state \nin which the Point of Interconnection is located, under the laws and regulations of \nsuch state; and \n(b) \nto meet the minimum insurance requirements of Articles 18.3.2 through 18.3.8 to \nthe extent it maintains a self-insurance program; provided that, such Party’s senior \nunsecured debt or issuer rating is BBB-, or better, as rated by Standard & Poor’s \nand that its self-insurance program meets the minimum insurance requirements of \nArticles 18.3.2 through 18.3.8. For any period of time that a Party’s senior \nunsecured debt rating and issuer rating are both unrated by Standard & Poor’s or"},{"page":131,"startToken":50843,"endToken":51314,"text":"44 \nare both rated at less than BBB- by Standard & Poor’s, such Party shall comply \nwith the insurance requirements applicable to it under Articles 18.3.2 through \n18.3.9. \n(c) \nin the event that a Party is permitted to self-insure pursuant to this Article 18.3.10, \nit shall notify the other Parties that it meets the requirements to self-insure and \nthat its self-insurance program meets the minimum insurance requirements in a \nmanner consistent with that specified in Article 18.3.9. \n18.3.11The Parties agree to report to each other in writing as soon as practical all accidents \nor occurrences resulting in injuries to any person, including death, and any property \ndamage greater than $25,000, including within the scope of coverage of such \ninsurance whether or not such coverage is sought. \nArticle 19. Assignment \n19.1 \nAssignment. This LLIA may be assigned by a Party only with the written consent of the \nother Parties; provided that a Party may assign this LLIA without the consent of the other \nParties to any Affiliate of the assigning Party with an equal or greater credit rating and \nwith the legal authority and operational ability to satisfy the obligations of the assigning \nParty under this LLIA; and provided further that the Large Load Interconnection \nCustomer shall have the right to assign this LLIA, without the consent of the \nParticipating TO for collateral security purposes to aid in providing financing for the \nLarge Load Facility, provided that the Large Load Interconnection Customer will \npromptly notify the Participating TO of any such assignment. Any financing arrangement \nentered into by the Large Load Interconnection Customer pursuant to this Article will \nprovide that prior to or upon the exercise of the secured party’s, trustee’s or mortgagee’s \nassignment rights pursuant to said arrangement, the secured creditor, the trustee or \nmortgagee will notify the Participating TO of the date and particulars of any such \nexercise of assignment right(s), including providing the Participating TO, with proof that \nit meets the requirements of Articles 11.3 and 18.3. Any attempted assignment that \nviolates this Article is void and ineffective. Any assignment under this LLIA shall not \nrelieve a Party of its obligations, nor shall a Party’s obligations be enlarged, in whole or \nin part, by reason thereof. Where required, consent to assignment will not be \nunreasonably withheld, conditioned or delayed. \nArticle 20. Severability \n20.1 \nSeverability. If any provision in this LLIA is finally determined to be invalid, void or \nunenforceable by any court or other Governmental Authority having jurisdiction, such \ndetermination shall not invalidate, void or make unenforceable any other provision, \nagreement or covenant of this LLIA. \nArticle 21. Comparability \n21.1 \nComparability. The Parties will comply with all applicable comparability and code of \nconduct laws, rules and regulations, as amended from time to time."},{"page":132,"startToken":51314,"endToken":51814,"text":"45 \nArticle 22. Confidentiality \n22.1 \nConfidentiality. Confidential Information shall include, without limitation, all \ninformation relating to a Party’s technology, research and development, business affairs, \nand pricing, and any information supplied by any of the Parties to the other Parties prior \nto the execution of this LLIA. \nInformation is Confidential Information only if it is clearly designated or marked in \nwriting as confidential on the face of the document, or, if the information is conveyed \norally or by inspection, if the Party providing the information orally informs the Parties \nreceiving the information that the information is confidential. \nIf requested by any Party, the other Parties shall provide in writing the basis for asserting \nthat the information referred to in this Article 22 warrants confidential treatment, and the \nrequesting Party may disclose such writing to the appropriate Governmental Authority. \nEach Party shall be responsible for the costs associated with affording confidential \ntreatment to its information. \n22.1.1 Term. During the term of this LLIA, and for a period of three (3) years after the \nexpiration or termination of this LLIA, except as otherwise provided in this Article \n22, each Party shall hold in confidence and shall not disclose to any person \nConfidential Information. \n22.1.2 Scope. Confidential Information shall not include information that the receiving \nParty can demonstrate: (1) is generally available to the public other than as a result \nof a disclosure by the receiving Party; (2) was in the lawful possession of the \nreceiving Party on a non-confidential basis before receiving it from the disclosing \nParty; (3) was supplied to the receiving Party without restriction by a third party, \nwho, to the knowledge of the receiving Party after due inquiry, was under no \nobligation to the disclosing Party to keep such information confidential; (4) was \nindependently developed by the receiving Party without reference to Confidential \nInformation of the disclosing Party; (5) is, or becomes, publicly known, through no \nwrongful act or omission of the receiving Party or Breach of this LLIA; or (6) is \nrequired, in accordance with Article 22.1.7 of this LLIA, Order of Disclosure, to be \ndisclosed by any Governmental Authority or is otherwise required to be disclosed \nby law or subpoena, or is necessary in any legal proceeding establishing rights and \nobligations under this LLIA. Information designated as Confidential Information \nwill no longer be deemed confidential if the Party that designated the information as \nconfidential notifies the other Parties that it no longer is confidential. \n22.1.3 Release of Confidential Information. No Party shall release or disclose \nConfidential Information to any other person, except to its employees, consultants, \nAffiliates (limited by the Standards of Conduct requirements set forth in Part 358 of \nFERC’s Regulations, 18 C.F.R. 358), subcontractors, or to parties who may be or \nconsidering providing financing to or equity participation with the Large Load \nInterconnection Customer, or to potential purchasers or assignees of the Large Load \nInterconnection Customer, on a need-to-know basis in connection with this LLIA,"},{"page":133,"startToken":51814,"endToken":52305,"text":"46 \nunless such person has first been advised of the confidentiality provisions of this \nArticle 22 and has agreed to comply with such provisions. Notwithstanding the \nforegoing, a Party providing Confidential Information to any person shall remain \nprimarily responsible for any release of Confidential Information in contravention \nof this Article 22. \n22.1.4 Rights. Each Party retains all rights, title, and interest in the Confidential \nInformation that each Party discloses to the other Parties. The disclosure by each \nParty to the other Parties of Confidential Information shall not be deemed a waiver \nby a Party or any other person or entity of the right to protect the Confidential \nInformation from public disclosure. \n22.1.5 No Warranties. The mere fact that a Party has provided Confidential Information \ndoes not constitute a warranty or representation as to its accuracy or completeness. \nIn addition, by supplying Confidential Information, no Party obligates itself to \nprovide any particular information or Confidential Information to the other Parties \nnor to enter into any further agreements or proceed with any other relationship or \njoint venture. \n22.1.6 Standard of Care. Each Party shall use at least the same standard of care to protect \nConfidential Information it receives as it uses to protect its own Confidential \nInformation from unauthorized disclosure, publication or dissemination. Each Party \nmay use Confidential Information solely to fulfill its obligations to the other Parties \nunder this LLIA or its regulatory requirements. \n22.1.7 Order of Disclosure. If a court or a Governmental Authority or entity with the \nright, power, and apparent authority to do so requests or requires any Party, by \nsubpoena, oral deposition, interrogatories, requests for production of documents, \nadministrative order, or otherwise, to disclose Confidential Information, that Party \nshall provide the other Parties with prompt notice of such request(s) or \nrequirement(s) so that the other Parties may seek an appropriate protective order or \nwaive compliance with the terms of this LLIA. Notwithstanding the absence of a \nprotective order or waiver, the Party may disclose such Confidential Information \nwhich, in the opinion of its counsel, the Party is legally compelled to disclose. Each \nParty will use Reasonable Efforts to obtain reliable assurance that confidential \ntreatment will be accorded any Confidential Information so furnished. \n22.1.8 Termination of Agreement. Upon termination of this LLIA for any reason, each \nParty shall, within ten (10) Calendar Days of receipt of a written request from \nanother Party, use Reasonable Efforts to destroy, erase, or delete (with such \ndestruction, erasure, and deletion certified in writing to the other Party) or return to \nthe other Party, without retaining copies thereof, any and all written or electronic \nConfidential Information received from the other Party. \n22.1.9 Remedies. The Parties agree that monetary damages would be inadequate to \ncompensate a Party for another Party’s Breach of its obligations under this Article \n22. Each Party accordingly agrees that the other Parties shall be entitled to equitable"},{"page":134,"startToken":52305,"endToken":52886,"text":"47 \nrelief, by way of injunction or otherwise, if the first Party Breaches or threatens to \nBreach its obligations under this Article 22, which equitable relief shall be granted \nwithout bond or proof of damages, and the receiving Party shall not plead in \ndefense that there would be an adequate remedy at law. Such remedy shall not be \ndeemed an exclusive remedy for the Breach of this Article 22 but shall be in \naddition to all other remedies available at law or in equity. The Parties further \nacknowledge and agree that the covenants contained herein are necessary for the \nprotection of legitimate business interests and are reasonable in scope. No Party, \nhowever, shall be liable for indirect, incidental, or consequential or punitive \ndamages of any nature or kind resulting from or arising in connection with this \nArticle 22. \n22.1.10 Disclosure to FERC, its Staff, or a State. Notwithstanding anything in this \nArticle 22 to the contrary, and pursuant to 18 C.F.R. section 1b.20, if FERC or its \nstaff, during the course of an investigation or otherwise, requests information from \none of the Parties that is otherwise required to be maintained in confidence pursuant \nto this LLIA, the Party shall provide the requested information to FERC or its staff, \nwithin the time provided for in the request for information. In providing the \ninformation to FERC or its staff, the Party must, consistent with 18 C.F.R. section \n388.112, request that the information be treated as confidential and non-public by \nFERC and its staff and that the information be withheld from public disclosure. \nParties are prohibited from notifying the other Parties to this LLIA prior to the \nrelease of the Confidential Information to FERC or its staff. The Party shall notify \nthe other Parties to the LLIA when it is notified by FERC or its staff that a request \nto release Confidential Information has been received by FERC, at which time any \nof the Parties may respond before such information would be made public, pursuant \nto 18 C.F.R. section 388.112. Requests from a state regulatory body conducting a \nconfidential investigation shall be treated in a similar manner if consistent with the \napplicable state rules and regulations. \n22.1.11 Subject to the exception in Article 22.1.10, Confidential Information shall not be \ndisclosed by the other Parties to any person not employed or retained by the other \nParties, except to the extent disclosure is: (i) required by law; (ii) reasonably \ndeemed by the disclosing Party to be required to be disclosed in connection with a \ndispute between or among the Parties, or the defense of litigation or dispute; (iii) \notherwise permitted by consent of the other Parties, such consent not to be \nunreasonably withheld; or (iv) necessary to fulfill its obligations under this LLIA or \nas a transmission service provider or a Balancing Authority including disclosing the \nConfidential Information to a Regional Transmission Organization or Independent \nSystem Operator or to a regional or national reliability organization. The Party \nasserting confidentiality shall notify the other Parties in writing of the information it \nclaims is confidential. Prior to any disclosures of another Party’s Confidential \nInformation under this subparagraph, or if any third party or Governmental \nAuthority makes any request or demand for any of the information described in this \nsubparagraph, the disclosing Party agrees to promptly notify the other Party in \nwriting and agrees to assert confidentiality and cooperate with the other Party in"},{"page":135,"startToken":52886,"endToken":53359,"text":"48 \nseeking to protect the Confidential Information from public disclosure by \nconfidentiality agreement, protective order or other reasonable measures. \nArticle 23. Environmental Releases \n23.1 \nEach Party shall notify the other Parties, first orally and then in writing, of the release of \nany Hazardous Substances, any asbestos or lead abatement activities, or any type of \nremediation activities related to the Large Load Facility or the Interconnection Facilities, \neach of which may reasonably be expected to affect the other Parties. The notifying Party \nshall: (i) provide the notice as soon as practicable, provided such Party makes a good \nfaith effort to provide the notice no later than twenty-four (24) hours after such Party \nbecomes aware of the occurrence; and (ii) promptly furnish to the other Parties copies of \nany publicly available reports filed with any Governmental Authorities addressing such \nevents. \nArticle 24. Information Requirements \n24.1 \nInformation Acquisition. The Participating TO and the Large Load Interconnection \nCustomer shall submit specific information regarding the electrical characteristics of their \nrespective facilities to each other as described below and in accordance with Applicable \nReliability Standards. \n24.2 \nInformation Submission by Participating TO. The initial information submission by \nthe Participating TO shall occur no later than one hundred eighty (180) Calendar Days \nprior to Trial Operation and shall include the Participating TO’s Transmission System \ninformation necessary to allow the Large Load Interconnection Customer to select \nequipment and meet any system protection and stability requirements, unless otherwise \nagreed to by the Participating TO and the Large Load Interconnection Customer. On a \nmonthly basis the Participating TO shall provide the Large Load Interconnection \nCustomer and, as applicable, the CAISO a status report on the construction and \ninstallation of the Participating TO’s Interconnection Facilities and Network Upgrades, \nincluding, but not limited to, the following information: (1) progress to date; (2) a \ndescription of the activities since the last report; (3) a description of the action items for \nthe next period; and (4) the delivery status of equipment ordered. \nArticle 25. Information Access and Audit Rights \n25.1 \nInformation Access. Each Party (the “disclosing Party”) shall make available to the \nother Party information that is in the possession of the disclosing Party and is necessary \nin order for the other Party to: (i) verify the costs incurred by the disclosing Party for \nwhich the other Party is responsible under this LLIA; and (ii) carry out its obligations and \nresponsibilities under this LLIA. The Parties shall not use such information for purposes \nother than those set forth in this Article 25.1 and to enforce their rights under this LLIA. \nNothing in this Article 25 shall obligate the Participating TO to make available to a Party \nany third-party information in its possession or control. if making such third-party \ninformation available would violate Participating TO’s obligations the use or disclosure \nof such third-party information."},{"page":136,"startToken":53359,"endToken":53886,"text":"49 \n25.2 \nReporting of Non-Force Majeure Events. Each Party (the “notifying Party”) shall \nnotify the other Parties when the notifying Party becomes aware of its inability to comply \nwith the provisions of this LLIA for a reason other than a Force Majeure event. The \nParties agree to cooperate with each other and provide necessary information regarding \nsuch inability to comply, including the date, duration, reason for the inability to comply, \nand corrective actions taken or planned to be taken with respect to such inability to \ncomply. Notwithstanding the foregoing, notification, cooperation or information provided \nunder this Article shall not entitle the Party receiving such notification to allege a cause \nfor anticipatory breach of this LLIA. \n25.3 \nAudit Rights. Subject to the requirements of confidentiality under Article 22 of this \nLLIA, the Parties’ audit rights shall include audits of a Party’s costs pertaining to such \nParty’s performance or satisfaction of obligations owed to the other Party under this \nLLIA, calculation of invoiced amounts and each such Party’s actions in an Emergency \nCondition. The Large Load Interconnection Customer and the Participating TO shall each \nhave the right, during normal business hours, and upon prior reasonable notice to the \nother Party, to audit at its own expense the other Party’s accounts and records pertaining \nto either such Party’s performance or either such Party’s satisfaction of obligations owed \nto the other Party under this LLIA.  Any audit authorized by this Article shall be \nperformed at the offices where such accounts and records are maintained and shall be \nlimited to those portions of such accounts and records that relate to each such Party’s \nperformance and satisfaction of obligations under this LLIA. Each such Party shall keep \nsuch accounts and records for a period equivalent to the audit rights periods described in \nArticle 25.4. \n25.4 \nAudit Rights Periods. \n25.4.1 Audit Rights Period for Construction-Related Accounts and Records. Accounts \nand records related to the design, engineering, procurement, and construction of \nParticipating TO’s Interconnection Facilities, Network Upgrades, and Distribution \nUpgrades constructed by the Participating TO shall be subject to audit for a period \nof twenty-four (24) months following the Participating TO’s issuance of a final \ninvoice in accordance with Article 12.2. Accounts and records related to the design, \nengineering, procurement, and construction of Participating TO’s Interconnection \nFacilities constructed by the Large Load Interconnection Customer shall be subject \nto audit and verification by the Participating TO for a period of twenty-four (24) \nmonths following the Large Load Interconnection Customer’s issuance of a final \ninvoice. \n25.4.2 Audit Rights Period for All Other Accounts and Records. Accounts and records \nrelated to a Party’s performance or satisfaction of all obligations under this LLIA \nother than those described in Article 25.4.1 shall be subject to audit as follows: (i) \nfor an audit relating to cost obligations, the applicable audit rights period shall be \ntwenty-four (24) months after the auditing Party’s receipt of an invoice giving rise \nto such cost obligations; and (ii) for an audit relating to all other obligations, the \napplicable audit rights period shall be twenty-four (24) months after the event for \nwhich the audit is sought."},{"page":137,"startToken":53886,"endToken":54405,"text":"50 \n25.5 \nAudit Results. If an audit by the Large Load Interconnection Customer or the \nParticipating TO determines that an overpayment or an underpayment has occurred with \nrespect to the other Party, a notice of such overpayment or underpayment shall be given \nto the other Party together with those records from the audit which supports such \ndetermination. The Party that is owed payment shall render an invoice to the other Party \nand such invoice shall be paid pursuant to Article 12 hereof. \nArticle 26. Subcontractors \n26.1 \nGeneral. Nothing in this LLIA shall prevent a Party from utilizing the services of any \nsubcontractor as it deems appropriate to perform its obligations under this LLIA; \nprovided, however, that each Party shall require its subcontractors to comply with all \napplicable terms and conditions of this LLIA in providing such services and each Party \nshall remain primarily liable to the other Party for the performance of such subcontractor. \n26.2 \nResponsibility of Principal. The creation of any subcontract relationship shall not \nrelieve the hiring Party of any of its obligations under this LLIA. The hiring Party shall \nbe fully responsible to the other Parties for the acts or omissions of any subcontractor the \nhiring Party hires as if no subcontract had been made; provided, however, that in no event \nshall the Participating TO, or, as applicable, the CAISO be liable for the actions or \ninactions of the Large Load Interconnection Customer or its subcontractors with respect \nto obligations of the Large Load Interconnection Customer under Article 5 of this LLIA. \nAny applicable obligation imposed by this LLIA upon the hiring Party shall be equally \nbinding upon, and shall be construed as having application to, any subcontractor of such \nParty. \n26.3 \nNo Limitation by Insurance. The obligations under this Article 26 will not be limited in \nany way by any limitation of subcontractor’s insurance. \nArticle 27. Disputes \nAll disputes arising out of or in connection with this LLIA shall be settled in accordance with \nthis Article 27. \n27.1 \nSubmission. In the event either Party has a dispute, or asserts a claim, that arises out of \nor in connection with this LLIA or its performance, such Party (the “disputing Party”) \nshall provide the other Party with written notice of the dispute or claim (“Notice of \nDispute”). Such dispute or claim shall be referred to a designated senior representative of \neach Party for resolution on an informal basis as promptly as practicable after receipt of \nthe Notice of Dispute by the other Party. In the event the designated representatives are \nunable to resolve the claim or dispute through unassisted or assisted negotiations within \nthirty (30) Calendar Days of the other Party’s receipt of the Notice of Dispute, such claim \nor dispute may, upon mutual agreement of the Parties, be submitted to arbitration and \nresolved in accordance with the arbitration procedures set forth below. In the event the \nParties do not agree to submit such claim or dispute to arbitration, each Party may \nexercise whatever rights and remedies it may have in equity or at law consistent with the \nterms of this LLIA."},{"page":138,"startToken":54405,"endToken":54954,"text":"51 \n27.2 \nExternal Arbitration Procedures. Any arbitration initiated under this LLIA shall be \nconducted before a single neutral arbitrator appointed by the Parties. If the Parties fail to \nagree upon a single arbitrator within ten (10) Calendar Days of the submission of the \ndispute to arbitration, each Party shall choose one arbitrator who shall sit on a three (3)-\nmember arbitration panel. The two arbitrators so chosen shall within twenty (20) \nCalendar Days select a third arbitrator to chair the arbitration panel. In either case, the \narbitrators shall be knowledgeable in electric utility matters, including electric \ntransmission and bulk power issues, and shall not have any current or past substantial \nbusiness or financial relationships with any party to the arbitration (except prior \narbitration). The arbitrator(s) shall provide each of the Parties an opportunity to be heard \nand, except as otherwise provided herein, shall conduct the arbitration in accordance with \nthe Commercial Arbitration Rules of the American Arbitration Association (“Arbitration \nRules”) and any applicable FERC regulations; provided, however, in the event of a \nconflict between the Arbitration Rules and the terms of this Article 27, the terms of this \nArticle 27 shall prevail. \n27.3 \nArbitration Decisions. Unless otherwise agreed by the Parties, the arbitrator(s) shall \nrender a decision within ninety (90) Calendar Days of appointment and shall notify the \nParties in writing of such decision and the reasons therefor. The arbitrator(s) shall be \nauthorized only to interpret and apply the provisions of this LLIA and shall have no \npower to modify or change any provision of this LLIA in any manner. The decision of \nthe arbitrator(s) shall be final and binding upon the Parties, and judgment on the award \nmay be entered in any court having jurisdiction. The decision of the arbitrator(s) may be \nappealed solely on the grounds that the conduct of the arbitrator(s), or the decision itself, \nviolated the standards set forth in the Federal Arbitration Act or the Administrative \nDispute Resolution Act. The final decision of the arbitrator(s) must also be filed with \nFERC if it affects jurisdictional rates, terms and conditions of service, Interconnection \nFacilities, or Network Upgrades. \n27.4 \nCosts. Each Party shall be responsible for its own costs incurred during the arbitration \nprocess and for the following costs, if applicable: (1) the cost of the arbitrator chosen by \nthe Party to sit on the three (3) member panel and one half of the cost of the third \narbitrator chosen; or (2) one half (1/2) the cost of the single arbitrator jointly chosen by \nthe Parties. \nArticle 28. Representations, Warranties and Covenants \n28.1 \nGeneral. Each Party makes the following representations, warranties and covenants: \n28.1.1 Good Standing. Such Party is duly organized, validly existing and in good standing \nunder the laws of the state in which it is organized, formed, or incorporated, as \napplicable; that it is qualified to do business in the state or states in which the Large \nLoad Facility, Interconnection Facilities and Network Upgrades owned by such \nParty, as applicable, are located; and that it has the corporate power and authority to \nown its properties, to carry on its business as now being conducted and to enter into \nthis LLIA and carry out the transactions contemplated hereby and perform and"},{"page":139,"startToken":54954,"endToken":55443,"text":"52 \ncarry out all covenants and obligations on its part to be performed under and \npursuant to this LLIA. \n28.1.2 Authority. Such Party has the right, power and authority to enter into this LLIA, to \nbecome a Party hereto and to perform its obligations hereunder. This LLIA is a \nlegal, valid and binding obligation of such Party, enforceable against such Party in \naccordance with its terms, except as the enforceability thereof may be limited by \napplicable bankruptcy, insolvency, reorganization or other similar laws affecting \ncreditors’ rights generally and by general equitable principles (regardless of \nwhether enforceability is sought in a proceeding in equity or at law). \n28.1.3 No Conflict. The execution, delivery and performance of this LLIA does not \nviolate or conflict with the organizational or formation documents, or bylaws or \noperating agreement, of such Party, or any judgment, license, permit, order, \nmaterial agreement or instrument applicable to or binding upon such Party or any of \nits assets. \n28.1.4 Consent and Approval. Such Party has sought or obtained, or, in accordance with \nthis LLIA will seek or obtain, each consent, approval, authorization, order, or \nacceptance by any Governmental Authority in connection with the execution, \ndelivery and performance of this LLIA, and it will provide to any Governmental \nAuthority notice of any actions under this LLIA that are required by Applicable \nLaws and Regulations. \nArticle 29. [Reserved] \nArticle 30. Miscellaneous \n30.1 \nBinding Effect. This LLIA and the rights and obligations hereof, shall be binding upon \nand shall inure to the benefit of the successors and assigns of the Parties hereto. \n30.2 \nConflicts. In the event of a conflict between the body of this LLIA and any attachment, \nappendices or exhibits hereto, the terms and provisions of the body of this LLIA shall \nprevail and be deemed the final intent of the Parties. \n30.3 \nRules of Interpretation. This LLIA, unless a clear contrary intention appears, shall be \nconstrued and interpreted as follows: (1) the singular number includes the plural number \nand vice versa; (2) reference to any person includes such person’s successors and assigns \nbut, in the case of a Party, only if such successors and assigns are permitted by this LLIA, \nand reference to a person in a particular capacity excludes such person in any other \ncapacity or individually; (3) reference to any agreement (including this LLIA), document, \ninstrument or tariff means such agreement, document, instrument, or tariff as amended or \nmodified and in effect from time to time in accordance with the terms thereof and, if \napplicable, the terms hereof; (4) reference to any Applicable Laws and Regulations \nmeans such Applicable Laws and Regulations as amended, modified, codified, or \nreenacted, in whole or in part, and in effect from time to time, including, if applicable, \nrules and regulations promulgated thereunder; (5) unless expressly stated otherwise, \nreference to any Article, Section or Appendix means such Article of this LLIA or such"},{"page":140,"startToken":55443,"endToken":55955,"text":"53 \nAppendix to this LLIA, or such Section to the LLIP or such Appendix to the LLIP, as the \ncase may be; (6) “hereunder”, “hereof”, “herein”, “hereto” and words of similar import \nshall be deemed references to this LLIA as a whole and not to any particular Article or \nother provision hereof or thereof; (7) “including” (and with correlative meaning \n“include”) means including without limiting the generality of any description preceding \nsuch term; and (8) relative to the determination of any period of time, “from” means \n“from and including”, “to” means “to but excluding” and “through” means “through and \nincluding”. \n30.4 \nEntire Agreement. This LLIA, including all Appendices and Schedules attached hereto, \nconstitutes the entire agreement among the Parties with reference to the subject matter \nhereof, and supersedes all prior and contemporaneous understandings or agreements, oral \nor written, between or among the Parties with respect to the subject matter of this LLIA. \nThere are no other agreements, representations, warranties, or covenants which constitute \nany part of the consideration for, or any condition to, any Party’s compliance with its \nobligations under this LLIA. \n30.5 \nNo Third-Party Beneficiaries. This LLIA is not intended to and does not create rights, \nremedies, or benefits of any character whatsoever in favor of any persons, corporations, \nassociations, or entities other than the Parties, and the obligations herein assumed are \nsolely for the use and benefit of the Parties, their successors in interest and, where \npermitted, their assigns. \n30.6 \nWaiver. The failure of a Party to this LLIA to insist, on any occasion, upon strict \nperformance of any provision of this LLIA will not be considered a waiver of any \nobligation, right, or duty of, or imposed upon, such Party. \nAny waiver at any time by either Party of its rights with respect to this LLIA shall not be \ndeemed a continuing waiver or a waiver with respect to any other failure to comply with \nany other obligation, right, duty of this LLIA. Termination or Default of this LLIA for \nany reason by the Large Load Interconnection Customer shall not constitute a waiver of \nthe Large Load Interconnection Customer’s legal rights to obtain an interconnection from \nthe Participating TO. Any waiver of this LLIA shall, if requested, be provided in writing. \n30.7 \nHeadings. The descriptive headings of the various Articles of this LLIA have been \ninserted for convenience of reference only and are of no significance in the interpretation \nor construction of this LLIA. \n30.8 \nMultiple Counterparts. This LLIA may be executed in two or more counterparts, each \nof which is deemed an original but all constitute one and the same instrument. \n30.9 \nAmendment. The Parties may by mutual agreement amend this LLIA by a written \ninstrument duly executed by all of the Parties. Such amendment shall become effective \nand a part of this LLIA upon satisfaction of all Applicable Laws and Regulations. \n30.10 Modification by the Parties. The Parties may by mutual agreement amend the \nAppendices to this LLIA by a written instrument duly executed by all of the Parties. Such"},{"page":141,"startToken":55955,"endToken":56218,"text":"54 \namendment shall become effective and a part of this LLIA upon satisfaction of all \nApplicable Laws and Regulations. \n30.11 Reservation of Rights. The Large Load Interconnection Customer and the Participating \nTO shall have the right to make a unilateral filing with FERC to modify this LLIA \npursuant to sections 205 and 206 of the Federal Power Act or any other applicable \nprovision of the Federal Power Act and FERC’s rules and regulations thereunder; \nprovided that each Party shall have the right to protest any such filing by another Party \nand to participate fully in any proceeding before FERC in which such modifications may \nbe considered. Nothing in this LLIA shall limit the rights of the Parties or of FERC under \nsections 205 or 206 of the Federal Power Act and FERC’s rules and regulations \nthereunder, except to the extent that the Parties otherwise mutually agree as provided \nherein. \n30.12 No Partnership. This LLIA shall not be interpreted or construed to create an association, \njoint venture, agency relationship, or partnership among the Parties or to impose any \npartnership obligation or partnership liability upon any Party. No Party shall have any \nright, power or authority to enter into any agreement or undertaking for, or act on behalf \nof, or to act as or be an agent or representative of, or to otherwise bind, another Party. \n30.13 Joint and Several Obligations. Except as otherwise provided in this LLIA, the \nobligations of the CAISO, the Participating TO, and the Large Load Interconnection \nCustomer are several, and are neither joint nor joint and several."},{"page":142,"startToken":56218,"endToken":56264,"text":"IN WITNESS WHEREOF, the Parties have executed this LLIA in multiple originals, \neach of which shall constitute and be an original effective agreement among the Parties. \n[Insert name of Large Load Interconnection Customer] \nBy: _________________________  \nName: ______________________  \nTitle: _______________________  \nDate: _______________________  \n \n[Insert name of Participating TO] \nBy: _________________________  \nName: ______________________  \nTitle: _______________________  \nDate: _______________________"},{"page":143,"startToken":56264,"endToken":56325,"text":"Appendices to LLIA \nAppendix A Interconnection Facilities, Network Upgrades and Distribution Upgrades \nAppendix B Milestones \nAppendix C Interconnection Details \nAppendix D Security Arrangements Details \nAppendix E Commercial Operation Date \nAppendix F Addresses for Delivery of Notices and Billings  \nAppendix G Large Load Interconnection Customer’s Share of Costs of Network \nUpgrades for Applicable Project Group \nAppendix H Co-Location and Behind-the-Meter Generation Provisions"},{"page":144,"startToken":56325,"endToken":56549,"text":"Appendix A \nAppendix A \n \nInterconnection Facilities, Network Upgrades and Distribution Upgrades \nA-1: Facilities and Upgrades \n \nParticipating TO will coordinate with the Large Load Interconnection Customer to ensure that all \nlocal state utility franchise rules and regulations are adhered to through, among other things, \narrangements that provide for station service directly from the local franchised public \nutility.  Participating TO will coordinate with the Large Load Interconnection Customer to \nfacilitate any necessary pseudo-tie or similar arrangement for the delivery of power into the CAISO \nBAA. \n \n1. Interconnection Facilities: \n(a) \n[insert Large Load Interconnection Customer’s Interconnection Facilities]: \n(b) \n[insert Participating TO’s Interconnection Facilities]: \n2. \nNetwork Upgrades: \n(c) \n[insert Other Network Upgrades]: \n(i) \n \n(ii) \n[insert Participating TO’s Network Upgrades] \n3. \nDistribution Upgrades: \n \nA-2: FILI  \n1. Large Load Interconnection Customer has elected to take FILI until the Network Upgrades \nidentified in this Appendix A have reached Commercial Operation. \n2. The following documents and process shall be executed, undertaken and provided for FILI \nInterconnection Service applicants: \na. A pro forma Flexible Interconnection Service Addendum to the pro forma Large \nLoad Interconnection Agreement (or, alternatively, a standalone pro forma Flexible \nInterconnection Agreement) that identifies the roles and responsibilities for \nimpacted parties that will identify customer- and site-specific equipment and \nsystems necessary to operationalize FILI service; \nb. Study methodologies will be revised to recognize the unique operational \ncharacteristics of flexible large loads;"},{"page":145,"startToken":56549,"endToken":56741,"text":"Appendix A \nc. Operational requirements for FILI service will be revised, including curtailment \nimplementation mechanisms and data reporting; \nd. Cost responsibility provisions will be revised, including any financial security \nduring the conditional service period; \ne. Procedures for the transition-to-firm Interconnection Service provisions for FILI \nwill be implemented that specify the automatic conversion to firm service upon \nNetwork Upgrade completion; \nf. Coordination mechanisms shall be promulgated that address coordination between \nFILI Service and the Participating TO study process; and \ng. Operational requirements shall be revised to address the management of longer-\nduration curtailments in coordination with, as applicable, the CAISO. \n3. Further, the following considerations will be addressed in the FILI application process: \na. Curtailment triggers and operating conditions and the process for establishing \ncurtailment parameters; \nb. Deployment priorities between FILI and non-FILI applicants; \nc. Scheduling treatment between FILI and non-FILI Large Load Facilities; \nd. The relationship between operational restrictions and study assumptions; \ne. Potential interactions with scheduling, dispatch, and price formation; and \nf. How the FILI Interconnection Service may apply to co-located load arrangements \n[and existing generation resources], particularly where load flexibility can reduce \ntransmission impacts or support continued wholesale market participation."},{"page":146,"startToken":56741,"endToken":56746,"text":"Appendix B \nAppendix B \n \nMilestones"},{"page":147,"startToken":56746,"endToken":56752,"text":"Appendix C \nAppendix C \n \nInterconnection Details"},{"page":148,"startToken":56752,"endToken":56834,"text":"Appendix D \nAppendix D \n \nSecurity Arrangements Details \nInfrastructure security of CAISO Controlled Grid equipment and operations and control \nhardware and software is essential to ensure day-to-day CAISO Controlled Grid reliability and \noperational security. FERC will expect the Participating TOs, CAISO, market participants, and \nLarge Load Interconnection Customers interconnected to the CAISO Controlled Grid to comply \nwith Applicable Reliability Criteria. All public utilities will be expected to meet basic standards \nfor system infrastructure and operational security, including physical, operational, and cyber-\nsecurity practices."},{"page":149,"startToken":56834,"endToken":56963,"text":"Appendix E \nAppendix E \n[This Appendix E sets forth a form of letter to be provided by the Large Load Interconnection \nCustomer to the CAISO and Participating TO to provide formal notice of the Commercial \nOperation of a Large Load Facility.] \n[Date] \n[CAISO Address] \n[Participating TO Address] \nRe: \n__________ Large Load Facility \nDear ____________: \nOn [Date] [Large Load Interconnection Customer] has completed Trial Operation of \nUnit No. ___. This letter confirms that [Large Load Interconnection Customer] commenced \nCommercial Operation of Unit No. ___ at the Large Load Facility, effective as of [Date plus one \nday] and that [Large Load Interconnection Customer] provided the CAISO’s operations \npersonnel advance notice of its intended Commercial Operation Date no less than five (5) \nBusiness Days prior to that date. \nThank you. \n[Signature] \n[Large Load Interconnection Customer Representative]"},{"page":150,"startToken":56963,"endToken":57029,"text":"Appendix F \nAppendix F \nAddresses for Delivery of Notices and Billings \nNotices: \nParticipating TO: \n[To be supplied.] \nLarge Load Interconnection Customer: \n[To be supplied.] \nCAISO: \n[To be supplied.] \nBillings and Payments: \nParticipating TO: \n[To be supplied.] \nLarge Load Interconnection Customer: \n[To be supplied.] \nCAISO: \n[To be supplied.] \nAlternative Forms of Delivery of Notices (telephone, facsimile or e-mail): \nParticipating TO: \n[To be supplied.] \nLarge Load Interconnection Customer:"},{"page":151,"startToken":57029,"endToken":57038,"text":"Appendix F \n[To be supplied.] \nCAISO: \n[To be supplied.]"},{"page":152,"startToken":57038,"endToken":57056,"text":"Appendix G \n \nAppendix G \n \nLarge Load Interconnection Customer’s Share of Costs of Network Upgrades for \nApplicable Project Group"},{"page":153,"startToken":57056,"endToken":57570,"text":"Appendix H \n \nAppendix H Co-Location and Behind-the-Meter Generation Provisions \nH.1 \nPurpose and Scope. This Appendix H sets forth the terms that apply where the Large Load \nFacility is, or will be: (a) physically connected to the facilities of an existing or planned generating \nfacility on the generator interconnection customer’s side of the Point of Interconnection (“Co-\nLocated Generation”); or (b) served by a generating facility or energy storage device that delivers \nenergy to the Large Load Facility without using the transmission system or any distribution \nfacilities (“Behind-the-Meter Generation”). The Participating TO’s Tariff governs the \ninterconnection of the Large Load Facility, and the CAISO Tariff governs the interconnection of \nany generating facility that injects, or may inject, energy into the CAISO Controlled Grid. This \nAppendix H memorializes the procedures by which the Participating TO, the CAISO, and the \nLarge Load Interconnection Customer will coordinate those processes. Station power load, and \ngeneration that exclusively serves station power load, are excluded from this Appendix H. \nH.2 \nDescription of Co-Located Generation and Behind-the-Meter Generation. The Co-\nLocated Generation and/or Behind-the-Meter Generation serving the Large Load Facility, if any, \nis described as follows: [Identify facility name, owner/operator, technology type, nameplate \ncapacity (MW), storage capacity (MW/MWh), metering configuration, and whether the facility is: \n(i) back-up generation used only during outages or islanding; (ii) non-exporting Behind-the-Meter \nGeneration; or (iii) generation that may export energy to the CAISO Controlled Grid.] \nH.3 \nNon-Exporting Configurations. Back-up generation used only during outages or \nislanding, and non-exporting Behind-the-Meter Generation, do not require a CAISO generator \ninterconnection request and may be accommodated under the Participating TO’s Tariff, provided \nthat the Large Load Interconnection Customer installs and maintains control technologies and/or \nprotection systems sufficient to ensure that no energy is injected into the CAISO Controlled Grid \nand that such facilities do not adversely affect the CAISO Controlled Grid. The Large Load \nInterconnection Customer shall provide the Participating TO with all generation characteristics of \nsuch facilities, and the Participating TO shall provide that information to the CAISO in accordance \nwith Article H.6. \nH.4 \nPower Injection Triggers CAISO Generator Interconnection Process. Any injection, \nor proposed capability to inject, energy from Co-Located Generation or Behind-the-Meter \nGeneration into the CAISO Controlled Grid shall require the generating facility to submit an \ninterconnection request and be studied under the CAISO Tariff, including screening and \nparticipation in the applicable cluster study, and to execute a generator interconnection agreement \nwith the CAISO and the Participating TO (or a non-conforming agreement or bridging agreement \nwhere appropriate) before any such injection occurs. Scoring, financial requirements, and study \nresults shall be based on the interconnection capacity requested, which may be less than the \ngenerating facility’s maximum output. The generating facility may exercise all rights available \nunder the CAISO Tariff, including surplus interconnection service, grid enhancing technologies, \nand phasing. Any participating generator shall also complete the CAISO new resource \nimplementation process and execute a CAISO Participating Generator Agreement. No injection \ninto the CAISO Controlled Grid is authorized under this LLIA, and any unauthorized injection \nshall be a Breach of this LLIA."},{"page":154,"startToken":57570,"endToken":58112,"text":"Appendix H \n \nH.5 \nCoordination Procedures. Where Article H.4 applies, the Parties shall coordinate as \nfollows: (a) the Large Load Interconnection Customer shall submit comprehensive information on \nboth the Large Load Facility and the generating facility in the CAISO resource interconnection \nprocess and the Participating TO load interconnection process; (b) the Participating TO and the \nCAISO shall exchange and compare information to ensure that the load and generation studies are \nconsistent with the requested mode of operation and type of service, and shall seek to align load \nand generation study timing so that studies may proceed concurrently; (c) the generation study \nshall commence with the Large Load Facility assumptions and reflect the combined impact of the \nLarge Load Facility and the generating facility as requested; (d) a request to remove or add a co-\nlocated load after commencement of studies shall be made under the Participating TO’s tariff and \nevaluated by the Participating TO and the CAISO Tariff. \nH.6 \nInformation Requirements. In addition to the information required under the CAISO \nresource interconnection process and the operational requirements of this LLIA, the Large Load \nInterconnection Customer shall provide to the Participating TO (which shall provide it to the \nCAISO) and, where Article H.4 applies, to the CAISO: (a) the expected presence and range of \nenergy consumption characteristics of the Large Load Facility; (b) minimum and maximum \ngenerator operating capabilities; (c) generator operating characteristics when the Large Load \nFacility is at its minimum level; (d) market participation status, if any; (e) any load services \nrequested when the generator is offline; and (f) for non-exporting or non-participating generation, \nall generation characteristics. The Large Load Interconnection Customer shall notify the \nParticipating TO and the CAISO of any material change to such information, and forecasts \nsubmitted by the applicable Scheduling Coordinator shall reflect Co-Located Generation and \nBehind-the-Meter Generation impacts on the load forecast. \nH.7 \nMetering, Storage, and Settlement. The Participating TO shall require the Large Load \nFacility to be sub-metered independent of any Co-Located Generation or Behind-the-Meter \nGeneration, and the applicable Scheduling Coordinator shall report such meter values separately \nso that regulation and black start services are assessed on a gross load basis. Any wholesale energy \nstorage resource shall remain operationally separate from, and separately metered and settled from, \nthe Large Load Facility, and its energy shall not be commingled with the Large Load Facility. \nStation power load shall be metered separately consistent with Local Regulatory Authority \nrequirements. \nH.8 \nFull Load Exposure. The Interconnection Service provided under this LLIA shall be \nstudied and provided on the basis of the full Demand of the Large Load Facility, without reduction \nfor Co-Located Generation or Behind-the-Meter Generation, unless the Large Load \nInterconnection Customer has elected a flexible interconnection service with enforceable control \ntechnologies and/or protection systems that limit withdrawals from the CAISO Controlled Grid. \nH.9 \nCAISO Role; Order of Precedence. The CAISO’s obligations under this LLIA with \nrespect to the Large Load Facility are limited to those expressly set forth in this Appendix H and \nin the generator interconnection agreement, Participating Generator Agreement, or other CAISO \nagreement applicable to any Co-Located Generation, and the CAISO shall have no responsibility \nfor the financing or construction of facilities required solely for the Large Load Facility."},{"page":155,"startToken":58112,"endToken":58131,"text":"Appendix IV \nAttachment 4  \nInterconnection Financial Security \nfor Interconnection Requests Processed under the Large Load Interconnection Process and \nTimeline"},{"page":156,"startToken":58131,"endToken":58463,"text":"2 \n \nAttachment 4 \nto the DCRT Large Load Interconnection Process and Timeline  \nDCRT TO Tariff, Appendix IV \nINTERCONNECTION FINANCIAL SECURITY \nDefined Terms: \n \nConstruction Activities shall mean any activities related to the construction of the Network \nUpgrades, including but not limited to equipment procurement, engineering, construction and \nassociated activities. \n \nCurrent Cost Responsibility shall mean the Large Load Interconnection Customer’s current \nallocated costs for Network Upgrades, not to exceed the Maximum Cost Responsibility, in each \ncase pursuant to Section 4 of the Facilities Study Agreement. This cost is used to calculate the \nLarge Load Interconnection Customer’s Interconnection Financial Security requirement. \n \nMaximum Cost Responsibility (MCR) shall mean, pursuant to this Attachment 4 and the \nFacilities Study Agreement, the full cost of: (1) assigned Network Upgrades and (2) Participating \nTransmission Operator’s (TO) Interconnection Facilities. \n \n1. Types of Interconnection Financial Security. \nThe Interconnection Financial Security posted by a Large Load Interconnection Customer \nmay be any combination of the following types of Interconnection Financial Security \nprovided in favor of the Participating TO: \n \n(a) \nan irrevocable and unconditional letter of credit issued by a bank or financial \ninstitution that has a credit rating of A or better by Standard and Poors or A2 \nor better by Moody’s; \n \n(b) \nan irrevocable and unconditional surety bond issued by an insurance company \nthat has a credit rating of A or better by Standard and Poors or A2 or better by \nMoody’s; \n \n(c) \nan unconditional and irrevocable guaranty issued by a company that has a \ncredit rating of A or better by Standard and Poors or A2 or better by Moody’s;  \n \n(d) \na cash deposit standing to the credit of the Participating TO in an interest-\nbearing escrow account maintained at a bank or financial institution that is \nreasonably acceptable to the Participating TO; \n \n(e) \na certificate of deposit in the name of the Participating TO issued by a bank or \nfinancial institution that has a credit rating of A or better by Standard and \nPoors or A2 or better by Moody’s; or"},{"page":157,"startToken":58463,"endToken":58837,"text":"3 \n \n(f) \na payment bond certificate in the name of the Participating TO issued by a \nbank or financial institution that has a credit rating of A or better by Standard \nand Poors or A2 or better by Moody’s. \n \nInterconnection Financial Security instruments as listed above shall be in such form as \nthe Participating TO may reasonably require from time to time by notice to Large Load \nInterconnection Customers or in such other form as has been evaluated and approved as \nreasonably acceptable by the Participating TO. \n \nThe Participating TO shall publish and maintain standardized forms related to the types \nof Interconnection Financial Security listed above which shall be accessible on the \nParticipating TO’S Website. The Participating TO shall require the use of standardized \nforms of Interconnection Financial Security to the greatest extent possible. If at any time \nthe guarantor of the Interconnection Financial Security fails to maintain the credit rating \nrequired by this Section 1, the Large Load Interconnection Customer shall provide to the \nParticipating TO replacement Interconnection Financial Security meeting the \nrequirements of this Section 1 within five (5) Business Days of the change in credit \nrating. \n \nInterest on a cash deposit standing to the credit of the Participating TO in an interest-\nbearing escrow account under Section 1(d) will accrue to the account of the Large Load \nInterconnection Customer. \n \n2. Interconnection Financial Security-Initial Posting for Large Load Interconnection \nCustomers. \n2.1 Each Large Load Interconnection Customer shall post, with notice to the \nParticipating TO, two (2) separate Interconnection Financial Security instruments: \n(i) a posting relating to the applicable Network Upgrades; and (ii) a posting \nrelating to the Participating TO’s Interconnection Facilities. \n \n2.2 Timing of Postings. The postings set forth in this Section 2 shall be made any \ntime after the issuance of the Facilities Study report but no later than ninety (90) \ncalendar days after issuance of the Facilities Study report for Large Load \nInterconnection. \n \n2.3 Revised Study Reports. If the Participating TO revises a Facilities Study, the \ninitial postings will be due from the Large Load Interconnection Customer by the \nlater of ninety (90) calendar days after issuance of the original Facilities Study \nReport or forty (40) calendar days after issuance of the revised Facilities Study \nreport."},{"page":158,"startToken":58837,"endToken":59270,"text":"4 \n \n2.4 Posting Amount for Network Upgrades. \n \n2.4.1 Large Load Interconnection Customers. Each Large Load \nInterconnection Customer for a Large Load Facility shall post an \nInterconnection Financial Security instrument relating to the Network \nUpgrades assigned to such Large Load Interconnection Customer pursuant \nto the Facilities Study. \nThe posting amount for such Network Upgrades shall equal the lesser of: \n(i) fifteen percent (15%) of the Current Cost Responsibility assigned to the \nLarge Load Interconnection Customer in the Facilities Study for Network \nUpgrades; (ii) $20,000 per megawatt of electrical load of the Large Load \nFacility or the amount of megawatt increase in the load of each existing \nLarge Load Facility as listed by the Large Load Interconnection Customer \nin its Large Load Interconnection Application, including any requested \nmodifications thereto; or (iii) $7,500,000, but in no event less than \n$500,000. \n \n2.5 Posting Amount for Participating TO Interconnection Facilities. \n2.5.1 Large Load Interconnection Customers. Each Large Load \nInterconnection Customer for a Large Load Facility shall post an \nInterconnection Financial Security instrument in an amount equal to the \nlesser of: (i) fifteen percent (15%) of the Current Cost Responsibility \nassigned to the Large Load Interconnection Customer in the Facilities \nStudy for Participating TO’s Interconnection Facilities; (ii) $20,000 per \nmegawatt of electrical load of the Large Load Facility or the amount of \nmegawatt increase in the load of each existing Large Load Facility as \nlisted by the Large Load Interconnection Customer in its Large Load \nInterconnection Application including any requested modifications \nthereto; or (iii) $7,500,000, but in no event less than $500,000. \n2.6 Cost Estimates Less than Minimum Posting Amounts. If (1) the Current Cost \nResponsibility of the assigned Network Upgrades, (2) the allocated costs of the \nParticipating TO Interconnection Facilities, or (3) both are less than the respective \nminimum posting amounts that would apply under Sections 2.3.1 or 2.4.1, then \nthe posting amount required will equal the Current Cost Responsibility of the \nAssigned Network Upgrades or the allocated costs for Participating TO \nInterconnection Facilities, as applicable. \n \n2.7 Consequences for Failure to Post. The failure by a Large Load Interconnection \nCustomer to timely post the Interconnection Financial Security required by this \nAttachment 4 shall result in the Large Load Interconnection Application being \ndeemed withdrawn. The Large Load Interconnection Customer shall provide the \nParticipating TO and the Participating TO with written notice that it has posted \nthe required Interconnection Financial Security no later than the applicable final \nday for posting. The failure by a Large Load Interconnection Customer to timely"},{"page":159,"startToken":59270,"endToken":59683,"text":"5 \n \npost the Interconnection Financial Security required by this Section 2 shall result \nin the Large Load Interconnection Application being deemed withdrawn. The \nLarge Load Interconnection Customer shall provide the Participating TO with \nwritten notice that it has posted the required Interconnection Financial Security no \nlater than the applicable final day for posting. \n \n2.8 Re-calculation of Initial Posting Requirement. If withdrawals, modifications, \nor system changes occur after the completion of the Facilities Study, and the \nParticipating TO, is able to reasonably determine, prior to the date for initial \nposting of Interconnection Financial Security, that as a result of such decrease \n(solely or in combination with other modifications made by Large Load \nInterconnection Customers) some of the Network Upgrades and/or Participating \nTO Interconnection Facilities identified in the Facilities Study will no longer be \nrequired, then the calculation of the initial posting of Interconnection Financial \nSecurity will not include those Network Upgrades and/or Participating TO \nInterconnection Facilities. Such determination will be made based on the \nParticipating TO’s best engineering judgment and will not include any re-studies.  \n \n3. Interconnection Financial Security –Second and Third Postings for Large Load \nInterconnection Customers. \n \n3.1 Second Posting for Large Load Interconnection Customers. \n \n3.1.1 Each Large Load Interconnection Customer shall make second postings, \nwith notice to the Participating TO, of two separate Interconnection \nFinancial Security instruments: (i) a second posting relating to the \nNetwork Upgrades; and (ii) a second posting relating to the Participating \nTO’s Interconnection Facilities. The Current Cost Responsibility for \ncalculating the second and third Interconnection Financial Security \npostings for Large Load Interconnection Customers shall be set forth in \nthe Facilities Study report. \n \n3.1.2 The postings set forth in this Section 3 for second postings for Large Load \nInterconnection Customers shall be made any time after issuance of the \nFacilities Study report but no later than thirty (30) calendar days prior to \nthe date on which the Facilities Study report provides that such amounts \nwill be needed to fund long lead time equipment procurement as part of \nthe Construction Activities for the Network Upgrades or the Participating \nTO’s Interconnection Facilities, whichever is earlier. \n \n3.2 Third Posting for Large Load Interconnection Customers. \n \n3.2.1 After the second posting for a Large Load Interconnection Customer has \nbeen made but no later than thirty (30) calendar days after the date on \nwhich the Participating TO provides notice that Participating TO is \nobligated to provide security needed to fund any additional obligations for"},{"page":160,"startToken":59683,"endToken":60031,"text":"6 \n \nNetwork Upgrades or Participating TO’s Interconnection Facilities on \nbehalf of the Large Load Interconnection Customer, whichever is earlier, \nthe Large Load Interconnection Customer shall modify the two (2) \nseparate Interconnection Financial Security instruments posted pursuant to \nSection 3.1. \n \n3.3 Determining Refundable Portion of the Interconnection Financial Security \nfor Network Upgrades. \n3.3.1 Withdrawal Between the First Posting and the Deadline for the \nSecond Posting. If the Large Load Interconnection Customer either \nwithdraws its Large Load Interconnection Application or terminates its \nLarge Load Interconnection Agreement (LLIA) at any time between the \ninitial posting and the deadline for the second posting of the \nInterconnection Financial Security for applicable Network Upgrades, then \nthe Participating TO shall liquidate the Interconnection Financial Security \nfor the applicable Network Upgrades and reimburse the Large Load \nInterconnection Customer the lesser of: \na. \nthe Interconnection Financial Security plus (any other provided \nsecurity plus any separately provided capital) less (all costs and \nexpenses incurred or irrevocably committed to finance Pre-\nConstruction Activities for Network Upgrades on behalf of the \nLarge Load Interconnection Customer); or \n \nb. \nthe Interconnection Financial Security plus (any other provided \nsecurity plus any separately provided capital) minus the lesser \nof fifty percent (50%) of the value of the posted \nInterconnection Financial Security for Network Upgrades or \n$10,000 per requested and approved, pre-downsized megawatt \nof the Large Load Facility load. \n \n3.3.2 Withdrawal Between the Second Posting and the Commencement of \nConstruction Activities. If the Large Load Interconnection Customer \neither withdraws or terminates its LLIA at any time after the second \nposting of the Interconnection Financial Security for applicable Network \nUpgrades and the Commencement of Construction Activities for such \nNetwork Upgrades, then the Participating TO shall liquidate the \nInterconnection Financial Security for the applicable Network Upgrades \nand reimburse the Large Load Interconnection Customer the lesser of: \n \na. \nthe Interconnection Financial Security plus (any other provided \nsecurity plus any separately provided capital) less (all costs and \nexpenses incurred or irrevocably committed to finance Pre-\nConstruction Activities for Network Upgrades on behalf of the \nLarge Load Interconnection Customer) and less (any posting"},{"page":161,"startToken":60031,"endToken":60419,"text":"7 \n \nreduction due to the Large Load Interconnection Customer’s \nelection to self-build Stand Alone Network Upgrades); or \nb. \nthe Interconnection Financial Security plus (any other provided \nsecurity plus any separately provided capital) minus the lesser \nof fifty percent (50%) of the value of the posted \nInterconnection Financial Security for Network Upgrades or \n$20,000 per requested and approved, pre-downsized megawatt \nof the Large Load Facility load. \n3.3.3 Special Treatment Based on Failure to Obtain Necessary Permit or \nAuthorization from Governmental Authority. If, at any time after the \nsecond posting requirement, the Large Load Interconnection Customer \nwithdraws the Large Load Interconnection Application or terminates the \nLLIA, as applicable, because the Large Load Interconnection Customer \nreceived a final denial from the primary issuing Governmental Authority \nfor authorization necessary for the construction or operation of the Large \nLoad Facility, and the Network Upgrades to be financed by the Large \nLoad Interconnection Customer are also to be financed by one or more \nother Large Load Interconnection Customers, then the provisions of \nSection 3.3.2 apply, except that the Large Load Interconnection Customer \nshall not be reimbursed for its share of any actual costs incurred or \nirrevocably committed by the Participating TO for Construction Activities. \n \n3.3.4 After Commencement of Construction Activities. Once Construction \nActivities on Network Upgrades on behalf of the Large Load \nInterconnection Customer commence, any withdrawal of the Large Load \nInterconnection Application or termination of the LLIA by the Large Load \nInterconnection Customer will be treated as follows: \n \nThe Participating TO shall liquidate the Interconnection Financial \nSecurity, or balance thereof, posted by the Large Load Interconnection \nCustomer for Network Upgrades at the time of withdrawal. \n \nTo the extent the amount of the liquidated Interconnection Financial \nSecurity plus capital, if any, separately provided by the Large Load \nInterconnection Customer to satisfy its obligation to finance Network \nUpgrades exceeds the total cost responsibility for Network Upgrades \nassigned to the Large Load Interconnection Customer, the Participating \nTO shall remit to the Large Load Interconnection Customer the excess \namount. \n \nWithdrawal of a Large Load Interconnection Application or termination of \na LLIA shall result in the release to the Large Load Interconnection \nCustomer of any Interconnection Financial Security posted by the Large \nLoad Interconnection Customer for Participating TO Interconnection \nFacilities, except with respect to any amounts necessary to pay for costs"},{"page":162,"startToken":60419,"endToken":60637,"text":"8 \n \nincurred or irrevocably committed by the Participating TO on behalf of the \nLarge Load Interconnection Customer for the Participating TO’s \nInterconnection Facilities and for which the Participating TO has not been \nreimbursed in accordance with this Attachment 4. Withdrawal of a Large \nLoad Interconnection Application or termination of a LLIA shall result in \nthe release to the Large Load Interconnection Customer of any \nInterconnection Financial Security posted by the Large Load \nInterconnection Customer for Participating TO Interconnection Facilities, \nexcept with respect to any amounts necessary to pay for costs incurred or \nirrevocably committed by the Participating TO on behalf of the Large \nLoad Interconnection Customer for the Participating TO’s Interconnection \nFacilities and for which the Participating TO has not been reimbursed in \naccordance with this Section 3.3.4. \n \n3.3.5 Accounting by The Participating TO. Within twenty (20) calendar days \nof any liquidating event, the Participating TO shall provide the \nParticipating TO and Large Load Interconnection Customer with an \naccounting of the disposition of the proceeds of the liquidated \nInterconnection Financial Security and remit to the Participating TO all \nproceeds not otherwise reimbursed to the Large Load Interconnection \nCustomer or applied to costs incurred or irrevocably committed by the \nParticipating TO on behalf of the Large Load Interconnection Customer in \naccordance with this Attachment 4."},{"page":163,"startToken":60637,"endToken":60642,"text":"REVISED DCRT TO TARIFF (REDLINE)"},{"page":164,"startToken":60642,"endToken":60654,"text":"DCR Transmission, L.L.C. \nTransmission Owner Tariff \n \nVersion 2.0.0"},{"page":165,"startToken":60654,"endToken":60678,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \nDCR TRANSMISSION, L.L.C. \nTRANSMISSION OWNER TARIFF"},{"page":166,"startToken":60678,"endToken":60895,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \nTABLE OF CONTENTS \n \nPage No. \n1. \nPreamble .............................................................................................................................4 \n2. \nEffective Date .....................................................................................................................4 \n3. \nTO Definitions ....................................................................................................................4 \n3.1. \nAccess Charge.........................................................................................................4 \n3.2. \nBase Transmission Revenue Requirement (“Base TRR”) .................................4 \n3.3. \nCompleted Application Date .................................................................................4 \n3.4. \nCompleted Interconnection Application ..............................................................4 \n3.5. \nDirect Assignment Facilities..................................................................................4 \n3.6. \nDCR Transmission, L.L.C. (“DCRT”).................................................................4 \n3.7. \nExisting Contracts ..................................................................................................5 \n3.8. \nExpedited Interconnection Agreement ................................................................5 \n3.9. \nCAISO ADR Procedures .......................................................................................5 \n3.10. CAISO Controlled Grid ........................................................................................5 \n3.11. CAISO Tariff ..........................................................................................................5 \n3.12. Interconnection Application .................................................................................5 \n3.13. Net FTR Revenue ...................................................................................................5 \n3.14. Participation Agreement .......................................................................................5 \n3.15. Project Proponent ..................................................................................................6 \n3.16. Regional Transmission Group (“RTG”) ..............................................................6 \n3.17. Regulatory Authority.............................................................................................6 \n3.18. Reliability Upgrade ................................................................................................6 \n3.19. Requests for Expedited Interconnection Procedures .........................................6 \n3.20. System Impact Study .............................................................................................6 \n3.21. System Impact Study Agreement .........................................................................6 \n3.22. TO Tariff.................................................................................................................6 \n3.23. Transmission Revenue Balancing Account Adjustment (“TRBAA”) ..............6 \n4. \nEligibility .............................................................................................................................7 \n5. \nAccess Charges ...................................................................................................................7 \n5.1. \nTransmission Revenue Requirement (“TRR”) ...................................................7 \n5.2. \nTransmission Revenue Balancing Account Adjustment (“TRBAA”) ..............7 \n6. \nAncillary Services--Applicability and Charges ...............................................................7 \n7. \nBilling and Payment ...........................................................................................................7 \n7.1. \nPayment ..................................................................................................................7 \n7.2. \nBilling ......................................................................................................................8"},{"page":167,"startToken":60895,"endToken":61239,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \n8. \nObligation to Interconnect or Construct Transmission Expansions and Facility \nUpgrades .............................................................................................................................8 \n8.1. \nParticipating TO Obligation to Interconnect ......................................................8 \n8.1.1. Interconnection to Transmission System .................................................8 \n8.1.2. Costs Associated with Interconnection ..................................................10 \n8.1.3. Interconnection Agreement.....................................................................10 \n8.1.4. Due Diligence to Construct .....................................................................11 \n8.1.5. Energization..............................................................................................11 \n8.1.6. Coordination with the CAISO on Interconnection Requests ..............12 \n8.2. \nParticipating TO Obligation to Construct Transmission Expansions or \nFacility Upgrades .................................................................................................12 \n8.2.1. Obligation to Construct ...........................................................................12 \n8.3. \nRequest for FERC Deference Regarding Need Determination .......................12 \n9. \nExpansion Process ............................................................................................................12 \n9.1. \nDetermination of Facilities ..................................................................................12 \n9.1.1. Payment of Facilities Study Costs ..........................................................12 \n9.1.1.1. \nMarket Participant to Pay for Facilities Study...............12 \n9.1.1.2. \nProject Sponsor or Project Proponent to Pay for \nFacilities Study ...................................................................12 \n9.1.1.3. \nPrincipal Beneficiaries to Pay for Facilities Study .........13 \n9.1.2. Payment Procedure ..................................................................................13 \n9.1.3. Facilities Study Procedures .....................................................................13 \n9.2. \nObligation to Build ...............................................................................................14 \n9.2.1. Due Diligence to Construct .....................................................................14 \n9.2.2. Delay in Construction or Expansion ......................................................15 \n9.2.2.1. \nAlternatives to the Original Facility Additions ..............15 \n9.2.2.2. \nRefund Obligation for Unfinished Facility Additions ....15 \n9.3. \nProvisions Relating To Transmission Construction on the Systems of Other \nTOs ........................................................................................................................16 \n9.3.1. Responsibility for Third Party Additions ..............................................16 \n9.3.2. Coordination of Third-Party System Additions....................................16 \n10. \nInterconnection Process...................................................................................................16 \n10.1. Applicability .........................................................................................................16 \n10.2. Applications ..........................................................................................................17 \n10.3. Interconnection Application ...............................................................................17 \n10.3.1. Amendment to Completed Interconnection Application .....................18 \n10.4. Review of Completed Interconnection Application ..........................................18 \n10.5. Notice of Need for System Impact Study ...........................................................19 \n10.6. System Impact Study Cost Reimbursement and Agreement ...........................19 \n10.6.1. Cost Reimbursement ...............................................................................20 \n10.6.2. Multiple Parties ........................................................................................20 \n10.7. System Impact Study Procedures .......................................................................20 \n10.7.1. Procedures Upon Completion of System Impact Study .......................20"},{"page":168,"startToken":61239,"endToken":61491,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n10.8. Notice of Need for Facilities Study .....................................................................21 \n10.9. Facilities Study Procedures .................................................................................22 \n10.9.1. Execution of Interconnection Agreement ..............................................22 \n10.10. Partial Interim Service ........................................................................................22 \n10.11. Expedited Procedures for New Facilities ...........................................................22 \n11.\nUncontrollable Forces and Indemnification ..................................................................23 \n11.1. Procedures to Follow if Uncontrollable Force Occurs .....................................23 \n11.2. Indemnification ....................................................................................................23 \n12.\nRegulatory Filings ............................................................................................................23 \n13.\nMiscellaneous....................................................................................................................23\n13.1. Notices ...................................................................................................................24 \n13.2. Waiver ...................................................................................................................24 \n13.3. Confidentiality ......................................................................................................24 \n13.3.1. Maintaining Confidentiality if Not for Public Disclosure ....................24 \n13.3.2. Disclosure of Confidential Information .................................................24 \n13.4. Titles ......................................................................................................................25 \n13.5. Severability ...........................................................................................................25 \n13.6. Preservation of Obligations .................................................................................25 \n13.7. Governing Law .....................................................................................................25 \n13.8. Appendices Incorporated ....................................................................................25 \n13.9. Consistency with CAISO Tariff ..........................................................................25 \n13.10. Disputes .................................................................................................................25 \n1.\nPreamble .............................................................................................................................4 \n2.\nEffective Date .....................................................................................................................4 \n3.\nTO Definitions ....................................................................................................................4 \n3.1. \nAccess Charge.........................................................................................................4 \n3.2. \nAlternative Transmission Technologies ...............................................................4 \n3.3. \nBase Transmission Revenue Requirement (“Base TRR”) .................................4 \n3.4. \nCAISO ADR Procedures .......................................................................................4 \n3.5. \nCAISO Controlled Grid ........................................................................................4 \n3.6. \nCAISO Tariff ..........................................................................................................4 \n3.7. \nCompleted Application Date .................................................................................5 \n3.8. \nCompleted Interconnection Application ..............................................................5 \n3.9. \nDirect Assignment Facilities..................................................................................5 \n3.10. DCR Transmission, L.L.C. (“DCRT”).................................................................5 \n3.11. Existing Contracts ..................................................................................................5 \n3.12. Expedited Interconnection Agreement ................................................................5 \n3.13. Flexible Interim Load Interconnection Service (“FILI Service”)_ ...................5 \n3.14. Interconnection Application .................................................................................5 \n3.15. Large Load .............................................................................................................5"},{"page":169,"startToken":61491,"endToken":61773,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \n3.16. Large Load Facilities Study ..................................................................................6 \n3.17. Large Load Facilities Study Agreement ..............................................................6 \n3.18. Large Load Interconnection Agreement .............................................................6 \n3.19. Large Load Interconnection Application ............................................................6 \n3.20. Large Load Interconnection Customer ...............................................................6 \n3.21. Large Load Interconnection Facilities .................................................................6 \n3.22. Large Load Interconnection Process (“LLIP”) ..................................................6 \n3.23. Large Load Interconnection Service ....................................................................6 \n3.24 \nLarge Load System Impact Study ........................................................................6 \n3.25. Large Load System Impact Study Agreement ....................................................7 \n3.26. Net FTR Revenue ...................................................................................................7 \n3.27. Participation Agreement .......................................................................................7 \n3.28. Project Proponent ..................................................................................................7 \n3.29. Regional Transmission Group (“RTG”) ..............................................................7 \n3.30. Regulatory Authority.............................................................................................7 \n3.31. Reliability Upgrade ................................................................................................7 \n3.32. Requests for Expedited Interconnection Procedures .........................................8 \n3.33. System Impact Study .............................................................................................8 \n3.34. System Impact Study Agreement .........................................................................8 \n3.35. TO Tariff.................................................................................................................8 \n3.36. Transmission Revenue Balancing Account Adjustment (“TRBAA”) ..............8 \n3.37. Participating TO’s Transmission System ............................................................8 \n4. \nEligibility .............................................................................................................................8 \n5. \nAccess Charges ...................................................................................................................8 \n5.1. \nTransmission Revenue Requirement (“TRR”) ...................................................8 \n5.2. \nTransmission Revenue Balancing Account Adjustment (“TRBAA”) ..............8 \n6. \nAncillary Services--Applicability and Charges ...............................................................9 \n7. \nBilling and Payment ...........................................................................................................9 \n7.1. \nPayment ..................................................................................................................9 \n7.2. \nBilling ......................................................................................................................9 \n8. \nObligation to Interconnect or Construct Transmission Expansions and Facility \nUpgrades .............................................................................................................................9 \n8.1. \nParticipating TO Obligation to Interconnect ......................................................9 \n8.1.1. Interconnection to Transmission System ...............................................10 \n8.1.1.1. \nLetter Agreement ..............................................................10 \n8.1.2. Costs Associated with Interconnection ..................................................11 \n8.1.3. Interconnection Agreement.....................................................................12 \n8.1.4. Due Diligence to Construct .....................................................................13 \n8.1.5. Energization..............................................................................................13 \n8.1.6. Coordination with the CAISO on Interconnection Requests ..............13"},{"page":170,"startToken":61773,"endToken":62108,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \n8.2. \nParticipating TO Obligation to Construct Transmission Expansions or \nFacility Upgrades .................................................................................................13 \n8.2.1. Obligation to Construct ...........................................................................13 \n8.3. \nRequest for FERC Deference Regarding Need Determination .......................14 \n9. \nExpansion Process ............................................................................................................14 \n9.1. \nDetermination of Facilities ..................................................................................14 \n9.1.1. Payment of Facilities Study Costs ..........................................................14 \n9.1.1.1. \nMarket Participant to Pay for Facilities Study...............14 \n9.1.1.2. \nProject Sponsor or Project Proponent to Pay for \nFacilities Study ...................................................................14 \n9.1.1.3. \nPrincipal Beneficiaries to Pay for Facilities Study .........14 \n9.1.2. Payment Procedure ..................................................................................15 \n9.1.3. Facilities Study Procedures .....................................................................15 \n9.2. \nObligation to Build ...............................................................................................15 \n9.2.1. Due Diligence to Construct .....................................................................15 \n9.2.2. Delay in Construction or Expansion ......................................................16 \n9.2.2.1. \nAlternatives to the Original Facility Additions ..............16 \n9.2.2.2. \nRefund Obligation for Unfinished Facility Additions ....16 \n9.3. \nProvisions Relating To Transmission Construction on the Systems of Other \nTOs ........................................................................................................................16 \n9.3.1. Responsibility for Third Party Additions ..............................................16 \n9.3.2. Coordination of Third-Party System Additions....................................17 \n10. \nInterconnection Process...................................................................................................17 \n10.1. Applicability .........................................................................................................17 \n10.2. Applications ..........................................................................................................17 \n10.3. Interconnection Application ...............................................................................17 \n10.3.1. Amendment to Completed Interconnection Application .....................18 \n10.4. Review of Completed Interconnection Application ..........................................19 \n10.5. Notice of Need for System Impact Study ...........................................................19 \n10.6. System Impact Study Cost Reimbursement and Agreement ...........................20 \n10.6.1. Cost Reimbursement ...............................................................................20 \n10.6.2. Multiple Parties ........................................................................................20 \n10.7. System Impact Study Procedures .......................................................................20 \n10.7.1. Procedures Upon Completion of System Impact Study .......................21 \n10.8. Notice of Need for Facilities Study .....................................................................21 \n10.9. Facilities Study Procedures .................................................................................22 \n10.9.1. Execution of Interconnection Agreement ..............................................22 \n10.10. Partial Interim Service ........................................................................................23 \n10.11. Expedited Procedures for New Facilities ...........................................................23 \n11. \nUncontrollable Forces and Indemnification ..................................................................23 \n11.1. Procedures to Follow if Uncontrollable Force Occurs .....................................23 \n11.2. Indemnification ....................................................................................................24"},{"page":171,"startToken":62108,"endToken":62367,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \n12. \nRegulatory Filings ............................................................................................................24 \n13. \nMiscellaneous....................................................................................................................24 \n13.1. Notices ...................................................................................................................24 \n13.2. Waiver ...................................................................................................................24 \n13.3. Confidentiality ......................................................................................................25 \n13.3.1. Maintaining Confidentiality if Not for Public Disclosure ....................25 \n13.3.2. Disclosure of Confidential Information .................................................25 \n13.4. Titles ......................................................................................................................25 \n13.5. Severability ...........................................................................................................25 \n13.6. Preservation of Obligations .................................................................................26 \n13.7. Governing Law .....................................................................................................26 \n13.8. Appendices Incorporated ....................................................................................26 \n13.9. Consistency with CAISO Tariff ..........................................................................26 \n13.10. Disputes .................................................................................................................26 \n4. \nEligibility .............................................................................................................................7 \n5. \nAccess Charges ...................................................................................................................7 \n5.1. \nTransmission Revenue Requirement (“TRR”) ...................................................7 \n5.2. \nTransmission Revenue Balancing Account Adjustment (“TRBAA”) ..............7 \n6. \nAncillary Services--Applicability and Charges ...............................................................7 \n7. \nBilling and Payment ...........................................................................................................7 \n7.1. \nPayment ..................................................................................................................7 \n7.2. \nBilling ......................................................................................................................8 \n8. \nObligation to Interconnect or Construct Transmission Expansions and Facility \nUpgrades .............................................................................................................................8 \n8.1. \nParticipating TO Obligation to Interconnect ......................................................8 \n8.1.1. Interconnection to Transmission System .................................................8 \n8.1.2. Costs Associated with Interconnection ..................................................10 \n8.1.3. Interconnection Agreement.....................................................................10 \n8.1.4. Due Diligence to Construct .....................................................................11 \n8.1.5. Energization..............................................................................................11 \n8.1.6. Coordination with the CAISO on Interconnection Requests ..............12 \n8.2. \nParticipating TO Obligation to Construct Transmission Expansions or \nFacility Upgrades .................................................................................................12 \n8.2.1. Obligation to Construct ...........................................................................12 \n8.3. \nRequest for FERC Deference Regarding Need Determination .......................12 \n9. \nExpansion Process ............................................................................................................12 \n9.1. \nDetermination of Facilities ..................................................................................12 \n9.1.1. Payment of Facilities Study Costs ..........................................................12 \n9.1.1.1. \nMarket Participant to Pay for Facilities Study...............12"},{"page":172,"startToken":62367,"endToken":62683,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \n9.1.1.2. \nProject Sponsor or Project Proponent to Pay for \nFacilities Study ...................................................................12 \n9.1.1.3. \nPrincipal Beneficiaries to Pay for Facilities Study .........13 \n9.1.2. Payment Procedure ..................................................................................13 \n9.1.3. Facilities Study Procedures .....................................................................13 \n9.2. \nObligation to Build ...............................................................................................14 \n9.2.1. Due Diligence to Construct .....................................................................14 \n9.2.2. Delay in Construction or Expansion ......................................................15 \n9.2.2.1. \nAlternatives to the Original Facility Additions ..............15 \n9.2.2.2. \nRefund Obligation for Unfinished Facility Additions ....15 \n9.3. \nProvisions Relating To Transmission Construction on the Systems of Other \nTOs ........................................................................................................................16 \n9.3.1. Responsibility for Third Party Additions ..............................................16 \n9.3.2. Coordination of Third-Party System Additions....................................16 \n10. \nInterconnection Process...................................................................................................16 \n10.1. Applicability .........................................................................................................16 \n10.2. Applications ..........................................................................................................17 \n10.3. Interconnection Application ...............................................................................17 \n10.3.1. Amendment to Completed Interconnection Application .....................18 \n10.4. Review of Completed Interconnection Application ..........................................18 \n10.5. Notice of Need for System Impact Study ...........................................................19 \n10.6. System Impact Study Cost Reimbursement and Agreement ...........................19 \n10.6.1. Cost Reimbursement ...............................................................................20 \n10.6.2. Multiple Parties ........................................................................................20 \n10.7. System Impact Study Procedures .......................................................................20 \n10.7.1. Procedures Upon Completion of System Impact Study .......................20 \n10.8. Notice of Need for Facilities Study .....................................................................21 \n10.9. Facilities Study Procedures .................................................................................22 \n10.9.1. Execution of Interconnection Agreement ..............................................22 \n10.10. Partial Interim Service ........................................................................................22 \n10.11. Expedited Procedures for New Facilities ...........................................................22 \n11. \nUncontrollable Forces and Indemnification ..................................................................23 \n11.1. Procedures to Follow if Uncontrollable Force Occurs .....................................23 \n11.2. Indemnification ....................................................................................................23 \n12. \nRegulatory Filings ............................................................................................................23 \n13. \nMiscellaneous....................................................................................................................23 \n13.1. Notices ...................................................................................................................24 \n13.2. Waiver ...................................................................................................................24 \n13.3. Confidentiality ......................................................................................................24 \n13.3.1. Maintaining Confidentiality if Not for Public Disclosure ....................24 \n13.3.2. Disclosure of Confidential Information .................................................24 \n13.4. Titles ......................................................................................................................25"},{"page":173,"startToken":62683,"endToken":62746,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \n13.5. Severability ...........................................................................................................25 \n13.6. Preservation of Obligations .................................................................................25 \n13.7. Governing Law .....................................................................................................25 \n13.8. Appendices Incorporated ....................................................................................25 \n13.9. Consistency with CAISO Tariff ..........................................................................25 \n13.10. Disputes .................................................................................................................25 \n \n \n \nAPPENDIX I TRANSMISSION REVENUE REQUIREMENT AND TRBAA \n \nAPPENDIX II NOTICE \n \nAPPENDIX III PRO FORMA LETTER AGREEMENT"},{"page":174,"startToken":62746,"endToken":62770,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \nAPPENDIX IV – LARGE LOAD INTERCONNECTION PROCESS AND TIMELINE"},{"page":175,"startToken":62770,"endToken":63197,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \n1. \nPreamble.  DCR Transmission, L.L.C.’s (“DCRT” or “Participating TO”) Transmission \nRevenue Requirement (“TRR”) for its Regional Transmission Facilities placed under the \nCalifornia Independent System Operator Corporation’s (“CAISO”) Operational Control, \nand certain terms and conditions relating to transmission expansion of and \ninterconnection with DCRT’s Regional Transmission Facilities placed under the CAISO’s \nOperational Control, are set forth in this Transmission Owner (“TO”) Tariff. \n2. \nEffective Date.  This TO Tariff is effective on the date on which DCRT became a \nParticipating TO, and shall continue to be effective so long as DCRT is a party to the \nTransmission Control Agreement (“TCA”). \n3. \nTO Definitions.  Certain capitalized terms used in this TO Tariff that are set out \nimmediately below shall have the meanings set out below unless otherwise stated or the \ncontext otherwise requires. Capitalized terms used in this TO Tariff and not defined \nbelow shall have the meanings set out in the CAISO Open Access Transmission Tariff \n(“Tariff”), as it may be amended from time to time. \n3.1. \nAccess Charge.  A charge paid by all Utility Distribution Companies, Small \nUtility Distribution Companies, and Metered Sub System (“MSS”) Operators with \nGross Load in a Participating Transmission Owner (“PTO” or “Participating TO”) \nService Territory, as set forth in CAISO Tariff, Article II.  The Access Charge \nincludes the Regional Access Charge and the Local Access Charge, as applicable.  \nThe Access Charge will recover the Participating TO’s TRR in accordance with \nCAISO Tariff, Appendix F, Schedule 3.   \n3.2  \nAlternative Transmission Technologies.  Any transmission technology other \nthan Network Upgrades that can be used to improve the Participating TO’s \nTransmission System facilitate the interconnection of a Customer or a Large Load \nInterconnection Customer, which may include but is not limited to, static \nsynchronous compensators, static VAR compensators, advanced power flow \ncontrol devices, transmission switching, synchronous condensers, voltage source \nconverters, advanced conductors, unified power flow controller, and tower lifting. \n3.3. \nBase Transmission Revenue Requirement (“Base TRR”).  The TRR before \nreflecting TRBAA and Standby Transmission Revenues. The Base TRR is shown \nin Appendix I to this TO Tariff. \n3.4.  \nCAISO ADR Procedures.  The procedures for resolution of disputes or \ndifferences set out in Section 13 of the CAISO Tariff, as amended from time to \ntime. \n3.5. \nCAISO-Controlled Grid.  The system of transmission lines and associated \nfacilities of the Participating TOs that have been placed under the CAISO’s \nOperational Control. \n \n3.6. \nCAISO Tariff.  The currently effective CAISO Agreement and Tariff, as it is on"},{"page":176,"startToken":63197,"endToken":63608,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \nfile with FERC and as may be modified from time to time. \n \n3.7. \nCompleted Application Date.  The date on which a party submits an \nInterconnection Application that satisfies the requirements of a Completed \nInterconnection Application. \n3.8. \nCompleted Interconnection Application.  An Interconnection Application that \nsatisfies all of the information and other requirements of Section 10.3 of this TO \nTariff and, if applicable, the information requirements as specified by the CAISO \nand posted on the CAISO Home Page. \n3.9. \nDirect Assignment Facilities.  Facilities or portions of facilities that are owned \nby the Participating TO necessary to physically and electrically interconnect a \nparticular party requesting interconnection under this TO Tariff to the CAISO \nControlled Grid at the point of interconnection.  Direct Assignment Facilities \nshall be specified in the Interconnection Agreement that governs Interconnection \nservice to such party and shall be subject to FERC approval. \n3.10. DCR Transmission, L.L.C. (“DCRT”).  The Delaware limited liability \ncorporation that is the Participating TO under this TO Tariff. \n3.11. Existing Contracts.  Those transmission service agreements or other contracts \nwhich grant transmission service rights in existence on the CAISO Operations \nDate (including any contracts entered into pursuant to such contracts) as may be \namended in accordance with their terms or by agreement between the parties \nthereto from time to time. \n3.12. Expedited Interconnection Agreement.  A contract between a party which has \nsubmitted a Request for Expedited Interconnection Procedures and the \nParticipating TO under which the Participating TO agrees to process, on an \nexpedited basis, the Completed Interconnection Application of such party and \nwhich sets forth the terms, conditions, and cost responsibilities for such \nInterconnection. \nCAISO ADR Procedures.  The procedures for resolution of disputes or differences set \nout in Section 13 of the CAISO Tariff, as amended from time to time. \nCAISO Controlled Grid.  The system of transmission lines and associated facilities of \nthe Participating TOs that have been placed under the CAISO’s Operational \nControl. \nCAISO Tariff.  The currently effective CAISO Agreement and Tariff, as it is on file \nwith FERC and as may be modified from time to time. \n \n3.13  Flexible Interim Load Interconnection Service (“FILI Service”). An \ninterconnection service that may be offered by Participating TO at its sole \ndiscretion, that interconnects a Large Load Facility that cannot be reliably served \nat its full requested capacity without the construction of Network Upgrades or"},{"page":177,"startToken":63608,"endToken":63984,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \nAlternative Transmission Technologies, subject to operational constraints on the \nLarge Load Facility to ensure Transmission System reliability, as memorialized in \na Large Load Interconnection Agreement.  \n3.14. Interconnection Application.  An application that requests Interconnection to \nthe CAISO Controlled Grid., other than a Large Load Interconnection \nApplication.  \n3.15  Large Load.  An End User located at a single site whose Point(s) of \nInterconnection is/are to the CAISO-Controlled Grid, and that has a peak load of \n50 MW or greater.  \n3.16.  Large Load Facilities Study.  The second study conducted as part of the LLIP \nas described in Appendix IV to this TO Tariff, used to create the detailed design \nof the interconnection facilities used to interconnect the Large Load to the \nParticipating TO’s facilities, based on the findings of the Large Load System \nImpact Study. \n3.17.  Large Load Facilities Study Agreement.  The prerequisite agreement before \nDCRT will conduct, or cause to be conducted, the Large Load Interconnection \nFacilities Study, a pro forma version of which constitutes Attachment 2 to \nAppendix IV of this TO Tariff. \n3.18.  Large Load Interconnection Agreement.  The required agreement between \nDCRT and a Large Load Interconnection Customer prior to construction of Large \nLoad Interconnection Facilities, a pro forma version of which constitutes \nAttachment 3 of Appendix IV of this TO Tariff. \n3.19.  Large Load Interconnection Application.  The required application for a Large \nLoad Interconnection Customer seeking interconnection with DCRT’s \nTransmission System, as described in Appendix IV to this TO Tariff.  \n3.20. Large Load Interconnection Customer.  Any entity that proposes to \ninterconnect a Large Load, or modify its existing interconnection, with the DCRT \nTransmission System.   \n3.21. Large Load Interconnection Facilities.  All facilities and equipment between \nthe Large Load and the Point of Interconnection, including any modification, \nadditions or upgrades that are necessary to physically and electrically interconnect \nthe Large Load to the transmission system. Interconnection Facilities are sole-use \nfacilities and shall not include Distribution Upgrades, Stand Alone Network \nUpgrades or Network Upgrades.  \n3.22. Large Load Interconnection Process (“LLIP”).  The process by which Large \nLoads may be interconnected to DCRT’s Transmission System, as described in \nAppendix IV to this TO Tariff."},{"page":178,"startToken":63984,"endToken":64477,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \n3.23.  Large Load Interconnection Service.  The service provided by the Participating \nTO associated with interconnecting the Large Load Interconnection Customer’s \nGenerating Facility to the CAISO-Controlled Grid and enabling it to receive \nelectric energy and capacity from the CAISO-Controlled Grid at the Point of \nInterconnection, pursuant to the terms of the Large Load Interconnection \nAgreement, the Participating TO’s TO Tariff, and the CAISO Tariff.  \n3.24.  Large Load System Impact Study.  The initial study conducted as part of the \nLLIP as described in Appendix IV to this TO Tariff, consisting of short circuit \nanalysis, a stability analysis, a power flow analysis, and any other studies that are \ndeemed necessary. \n3.25  Large Load System Impact Study Agreement.  The prerequisite agreement \nbefore DCRT will conduct, or cause to be conducted, the Large Load System \nImpact Study, a pro forma version of which constitutes Attachment 1 to Appendix \nIV of this TO Tariff. \n3.26. Net FTR Revenue.  The sum of: 1) The revenue received by the Participating \nTO from the sale, auction, or other transfer of the Financial Transmission Rights \n(“FTR”) provided to it pursuant to Section 9.4.3 FTR, or any substantively \nidentical successor provision, of the CAISO Tariff; and 2) For each hour: a) the \nUsage Charge revenue received by the Participating TO associated with its \nSection 9.4.3 FTRs; minus b) Usage Charges that are: i) incurred by the \nScheduling Coordinator for the Participating TO under CAISO Tariff Section \n7.3.1.4, ii) associated with the Participating TO’s Section 9.4.3 FTRs, and iii) \nincurred by the Participating TO for its energy transactions but not incurred as a \nresult of the use of the transmission by a third-party and minus c) the charges paid \nby the Participating TO pursuant to Section 7.3.1.7, to the extent such charges are \nincurred by the Scheduling Coordinator of the Participating TO on Congested \nInter-zonal Interfaces that are associated with the Section 9.4.3 FTRs provided to \nthe Participating TO. The component of Net FTR Revenue represented by item 2) \nimmediately above shall not be less than zero for any hour. \n3.27. Participation Agreement.  An agreement between a Participating TO and a \nProject Sponsor that specifies the terms and conditions under which the \nParticipating TO will construct a transmission addition or upgrade on behalf of \nthe Project Sponsor. \n3.28. Project Proponent.  A Market Participant or group of Market Participants that: \n(i) advocates a transmission addition or upgrade; (ii) is unwilling to pay the full \ncost of the proposed transmission addition and upgrade, and thus is not a Project \nSponsor; and (iii) initiates proceedings under the CAISO ADR Procedures to \ndetermine the need for the proposed transmission addition or upgrade. \n3.29. Regional Transmission Group (“RTG”).  A voluntary organization approved \nby FERC and composed of transmission owners, transmission users, and other"},{"page":179,"startToken":64477,"endToken":64839,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \nentities, organized to efficiently coordinate the planning, expansion, and use of \ntransmission on a regional and inter-regional basis. \n3.30. Regulatory Authority.  The Federal Energy Regulatory Commission (“FERC”), \nor successor agency. \n3.31. Reliability Upgrade.  The transmission facilities other than Direct Assignment \nFacilities beyond the first point of Interconnection necessary to interconnect a \nNew Facility or wholesale Load safely and reliably to the CAISO Controlled \nGrid, which would not have been necessary but for the Interconnection of a New \nFacility or wholesale Load, including network upgrades necessary to remedy \nshort circuit or stability problems resulting from the Interconnection of the new \nFacility or wholesale Load to the CAISO Controlled Grid. Reliability Upgrades \nalso include, consistent with WECC practice, the facilities necessary to mitigate \nany adverse impact a New Facility’s or wholesale Load’s Interconnection may \nhave on a path’s WECC path rating. Reliability Upgrades shall be specified in the \nInterconnection Agreement that governs Interconnection service and shall be \nsubject to FERC approval. \n3.32. Requests for Expedited Interconnection Procedures.  A written request by \nwhich an applicant for Interconnection can request expedited processing of its \nInterconnection Application. \n3.33. System Impact Study.  An engineering study conducted by a Participating TO to \ndetermine whether a request for Interconnection to the Participating TO’s \ntransmission system would require new transmission additions, upgrades or other \nmitigating measures. \n3.34. System Impact Study Agreement.  An agreement between a Participating TO \nand an entity that has requested Interconnection to the Participating TO’s \ntransmission system pursuant to which the entity requesting Interconnection \nagrees to reimburse the Participating TO for the cost of performing or reviewing a \nSystem Impact Study. \n3.35. TO Tariff.  This Transmission Owner Tariff, as it may be amended or \nsuperseded. \n3.36. Transmission Revenue Balancing Account Adjustment (“TRBAA”).  A \nmechanism established by the Participating TO which will ensure that all \nTransmission Revenue Credits and other credits specified in Sections 6 and 8 of \nCAISO Tariff, Appendix F, Schedule 3 flow through to CAISO Tariff and TO \nTariff transmission customers. \n3.37.  Participating TO’s Transmission System.  The transmission facilities owned \nby DCRT."},{"page":180,"startToken":64839,"endToken":65215,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \n4. \nEligibility.  Transmission service over DCRT’s Regional Transmission Facilities and \nEntitlements placed under the CAISO’s Operational Control shall be provided only to \nEligible Customers as defined by the CAISO Tariff. Any dispute as to whether a customer \nis eligible for wholesale transmission service shall be resolved by FERC. \n5. \nAccess Charges.  The applicable Access Charges are provided in the CAISO Tariff. \n5.1. \nTransmission Revenue Requirement (“TRR”).  As set forth in the CAISO \nTariff, the TRR for each Participating TO is used to develop the Access Charges \nset forth in the CAISO Tariff, and is used by the CAISO to calculate the \ndisbursement of wheeling revenues among Participating TOs pursuant to Section \n26.1.4.3 of the CAISO Tariff.  DCRT’s TRR is set forth in Appendix I. \n5.2. \nTRBAA.  The Participating TO shall maintain a Transmission Revenue \nBalancing Account (“TRBA”) that will ensure that all Transmission Revenue \nCredits and the refunds, specified in Sections 6 and 8 of Appendix F, Schedule 3 \nof the CAISO Tariff, flow through to transmission customers. The TRBAA shall \nbe equal to: TRBAA = TRCF + TRCT + I. \nTRCT = \nThe balance representing the prior period difference \nbetween the projected Transmission Revenue Credits \nand the actual credits. \n \nTRCF = \nThe forecast of Transmission Revenue Credits for \nthe following calendar year. \n \n  I \n= \nThe interest balance for the TRBA, which shall be \ncalculated using the interest rate pursuant to Section \n35.19(a) of FERC’s regulations under the Federal Power \nAct (18 CFR Section 35.19(a)). Interest shall be calculated \nbased on the average TRBA principal balance each month, \ncompounded quarterly. \n \nThe DCRT estimated TRBAA, calculated in accordance with the CAISO \nTariff, is stated in Appendix I. \n6. \nAncillary Services--Applicability and Charges.  If any Ancillary Services are required, \nDCRT will not provide such services, but transmission customers will be required to \nmeet any such requirement in accordance with the CAISO Tariff. \n7. \nBilling and Payment. \n7.1. \nPayment.  The CAISO, in accordance with the CAISO Tariff, shall pay the \nParticipating TO, among other things, Wheeling, Usage, Access Charge revenues, \nand FTR auction proceeds (excluding Usage Charge revenues payable to FTR \nHolders) in accordance with the CAISO Tariff."},{"page":181,"startToken":65215,"endToken":65658,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \n7.2. \nBilling.  Users of DCRT’s Regional Transmission Facilities and Entitlements \nplaced under the CAISO’s Operational Control shall pay to the CAISO all \napplicable charges in accordance with the CAISO Tariff. \n8. \nObligation to Interconnect or Construct Transmission Expansions and Facility \nUpgrades. \n8.1. \nParticipating TO Obligation to Interconnect.  The Participating TO shall, at \nthe request of a third party pursuant to Section 10, interconnect its system to the \nwholesale generation or load of such third party, or modify an existing wholesale \nInterconnection. Interconnections under this TO Tariff shall be available to \nentities eligible to request Interconnection consistent with the provisions of \nSection 210(a) of the FPA.  Interconnections requested by entities or individuals \nthat are not so eligible shall be governed by the Local Regulatory Authority. The \nprocedures for Interconnection of wholesale generation to the CAISO Controlled \nGrid shall be governed by the CAISO Tariff. \n8.1.1. Interconnection to Transmission System.  Interconnection must be \nconsistent with Good Utility Practice, in conformance with all Applicable \nReliability Criteria, all applicable statutes, regulations, and CAISO \nreliability criteria for the CAISO Controlled Grid. The Participating TO \nwill not accommodate the Interconnection if doing so would impair \nsystems reliability, or would otherwise impair the ability of the \nParticipating TO to honor its Encumbrances existing as of the time an \nentity submits its Interconnection Application. The Participating TO shall \nidentify any such adverse effect on its Encumbrances in the System \nImpact Study performed pursuant to Section 10.7. To the extent the \nParticipating TO determines that the Interconnection will have an adverse \neffect on Encumbrances, the party requesting Interconnection shall \nmitigate such adverse effect. \n8.1.1.1  Letter Agreement.  Pursuant to Section 12 of Appendix DD of \nthe ISO Tariff, prior to executing an Interconnection Agreement, a party \nseeking Interconnection may, in order to advance the implementation of \nits Interconnection, request, and the Participating TO shall offer the party, \na Letter Agreement, a pro forma version of which is set forth in Appendix \nIII to the TO Tariff, that authorizes the Participating TO to begin \nengineering, design, and procurement of long lead-time items, or \nconstruction necessary for the establishment of the Interconnection.  \nHowever, Participating TO shall not be obligated to offer a Letter \nAgreement if the party seeking Interconnection is in Dispute Resolution as \na result of an allegation that the party seeking Interconnection has failed to \nmeet any milestones or comply with any prerequisites specified in the ISO \nTariff.  The Letter Agreement is an optional procedure.  The Letter \nAgreement shall provide for the party seeking Interconnection to pay the"},{"page":182,"startToken":65658,"endToken":66136,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \ncost of all activities authorized by the party and to make advance \npayments or provide other satisfactory security for such costs. \nFollowing a party seeking Interconnection’s request for a Letter \nAgreement, the Participating TO shall prepare and tender to the party \nseeking Interconnection a draft Letter Agreement in the form of the \nParticipating TO’s FERC-approved Letter Agreement as set forth in \nAppendix III to the TO Tariff, including draft exhibits that include the \nproposed scope of work, estimated costs, payments, financial security and \nmilestones, as applicable.  The party seeking Interconnection shall \nprovide written comments, or notification of no comments, to the draft \nexhibits within thirty (30) Calendar Days.  The Participating TO and the \nparty seeking Interconnection shall negotiate concerning any disputed \nprovisions of the exhibits to the draft Letter Agreement for not more than \nninety (90) Calendar Days after the Participating TO tenders the draft \nLetter Agreement to the party seeking Interconnection.  If the party \nseeking Interconnection determines that negotiations are at an impasse, it \nmay request termination of the negotiations at any time after tender of the \ndraft Letter Agreement and request submission of the unexecuted Letter \nAgreement with FERC or initiate dispute resolution procedures pursuant \nto Section 13.10 of this TO Tariff.  If the party seeking Interconnection \nrequests termination of the negotiations, but within ninety (90) Calendar \nDays after the Participating TO tenders the draft Letter Agreement to the \nparty seeking Interconnection, fails to request either the filing of the \nunexecuted Letter Agreement or initiate dispute resolution procedures, it \nshall be deemed to have withdrawn its request for a Letter Agreement and \nthe Participating TO shall have no further obligation to enter into a Letter \nAgreement, unless an extension is mutually agreed to by the parties.  The \nParticipating TO shall provide to the party seeking Interconnection a final \nLetter Agreement within fifteen (15) Business Days after the completion \nof the negotiation process. \nFollowing submission of the final Letter Agreement to the party seeking \nInterconnection, the party shall either: (i) execute two originals of the \ntendered Letter Agreement and return them to the Participating TO; or (ii) \nrequest in writing that the Participating TO file with FERC a Letter \nAgreement in unexecuted form.  As soon as practicable, but not later than \nten (10) Business Days after receiving either the two executed originals of \nthe tendered Letter Agreement (if it does not conform with a FERC-\napproved Letter Agreement) or the request to file an unexecuted Letter \nAgreement, the Participating TO shall file the Letter Agreement with \nFERC, together with its explanation of any matters as to which the party \nseeking Interconnection and the Participating TO disagree and support for \nthe costs that the Participating TO proposes to charge to the party seeking \nInterconnection under the Letter Agreement.  An unexecuted Letter"},{"page":183,"startToken":66136,"endToken":66565,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \nAgreement should contain terms and conditions deemed appropriate by \nthe Participating TO for the Interconnection request.  \nIf the party seeking Interconnection executes the final Letter Agreement, \nthe Participating TO and the party seeking Interconnection shall perform \ntheir respective obligations in accordance with the terms of the Letter \nAgreement, subject to modification by FERC.  Upon submission of an \nunexecuted Letter Agreement, the party seeking Interconnection and the \nParticipating TO shall promptly comply with the unexecuted Letter \nAgreement, subject to modification by FERC. \n8.1.2. Costs Associated with Interconnection.  Each party requesting \nInterconnection shall pay the costs of planning, installing, owning, \noperating, and maintaining any Direct Assignment Facilities and, if \napplicable, any Reliability Upgrades required to provide the requested \nInterconnection. In addition, such party shall implement all existing \noperating procedures necessary to safely and reliability interconnect such \nparty’s generation or wholesale load to the facilities of the Participating \nTO and to ensure the CAISO Controlled Grid’s conformance with the \nCAISO Grid Planning Criteria, and shall bear all costs of implementing \nsuch operating procedures. Any additional costs associated with \naccommodating the Interconnection shall be allocated in accordance with \nthe cost responsibility methodology set forth in the CAISO Tariff for \ntransmission expansions or upgrades. \n8.1.3. Interconnection Agreement.  Pursuant to Section 10.4, 10.7.1, or \n10.9.1, a party requesting an Interconnection shall request in writing that \nthe Participating TO tender to such part an Interconnection Agreement that \nwill be filed with FERC, or the Local Regulatory Authority, in the case of \na Local Publicly Owned Electric Utility. The Interconnection Agreement \nwill include, without limitation, cost responsibilities and payment \nprovisions for any engineering, equipment, and construction, ownership, \noperation and maintenance costs for any Direct Assignment Facilities, any \nReliability Upgrades, any Delivery Upgrades, if applicable, and for any \nother mitigation measures. For an Interconnection request to remain a \nCompleted Interconnection Application, the party requesting the \nInterconnection shall execute the Interconnection Agreement and return it \nto the Participating TO within thirty (30) Business Days of receipt.  \nAlternatively, if an Eligible Customer requesting the Interconnection \nrequests the Participating TO to file an unexecuted Interconnection \nAgreement and commits to abide by the terms, conditions, and cost \nassignments determined to be just and reasonable under the CAISO ADR \nProcedures, including any determination by FERC or on appeal of a FERC \ndetermination in accordance with that process, the Participating TO shall \npromptly file an unexecuted Interconnection Agreement. Provided, \nhowever, that if the CAISO ADR Procedures concerns whether the"},{"page":184,"startToken":66565,"endToken":67036,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \nrequesting entity is an Eligible Customer, the Participating TO shall not be \nobligated to file an unexecuted interconnection Agreement or commence \nconstruction of the Interconnection facilities or incur other costs under the \nInterconnection Agreement until a final order determining the just and \nreasonable rates, terms, and conditions for such Interconnection \nAgreement has been issued by the applicable court or regulatory authority. \nThe Interconnection Agreement will set forth a payment schedule that \nenables the Participating TO to recover its costs. If the applicant elects not \nto execute the Interconnection Agreement and does not request the \nParticipating TO to file an unexecuted Interconnection Agreement, its \nCompleted Interconnection Agreement shall be deemed withdrawn, and \nthe applicant shall reimburse to the Participating TO all costs reasonably \nincurred in processing the application not covered by any System Impact \nStudy Agreement or Facilities Study Agreement. To maintain its queue \nposition, the applicant must timely comply with the Interconnection \nrequirements of Section 5.76 of the CAISO Tariff and Sections 8.1 and 10 \nof this TO Tariff. If the applicant fails to timely comply with such \nInterconnection requirements, such applicant shall pay the reasonable \ncosts of revising the System Impact Studies for other applicants that have \nestablished a new queue position due to the applicant either withdrawing \nits Interconnection Application or because its queue position has been \nmodified pursuant to the queuing provisions in Section 25 of the CAISO \nTariff. \n8.1.4. Due Diligence to Construct.  The Participating TO shall use due \ndiligence to construct, within a reasonable time, any Direct Assignment \nFacilities and any Reliability Upgrades that it is obligated to construct \npursuant to this TO Tariff and Section 24 of the CAISO Tariff. The \nParticipating TO’s obligation to build will be subject to: (1) its ability, \nafter making a good faith effort, to obtain any necessary approvals and \nproperty rights under applicable federal, state, and local laws; (2) the \npresence of a cost recovery mechanism with cost responsibility assigned to \naccordance with the CAISO Tariff or applicable FERC precedent; and (3) \na signed Interconnection Agreement or a signed Expedited Interconnection \nAgreement, or, by mutual agreement of the parties, FERC acceptance for \nfiling of an unexecuted Interconnection Agreement. \n8.1.5. Energization.  The Participating TO shall not be obligated to energize, \nnor shall the applicant or wholesale load be entitled to have its \ninterconnection to the CAISO -Controlled Grid energized, unless and until \nan Interconnection Agreement has been executed, or filed at FERC \npursuant to Section 8.1.3, and; or a Large Load Interconnection \nAgreement has been executed, or filed at FERC pursuant to Appendix IV, \nSection 2.5.1; and such agreement become effective and such applicant or \nwholesale load has demonstrated to the CAISO’s reasonable satisfaction"},{"page":185,"startToken":67036,"endToken":67450,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \nthat it has complied with all of the requirements of the CAISO Tariff and \nthe requirements of this TO Tariff. \n8.1.6. Coordination with CAISO on Interconnection Requests.  The \nParticipating TO shall coordinate with the CAISO and Affected TOs, if \nany, pursuant to the provisions of the TCA, in developing interconnection \nstandards and guidelines for processing interconnection request under this \nTO Tariff. \n8.2. \nParticipating TO Obligation to Construct Transmission Expansions or \nFacility Upgrades.  The Participating TO shall be obligated to:  (1) perform \nSystem Impact or Facility Studies where the Project Sponsor or the CAISO agrees \nto pay the study cost and specifies the project objectives to be achieved, and (2) \nbuild transmission additions and facility upgrades where the Participating TO is \nobligated to construct or expand facilities in accordance with and subject to the \nlimitations under Section 24 of the CAISO Tariff and this TO Tariff. \n8.2.1. Obligation to Construct.  A Participating TO shall not be obligated to \nconstruct or expand transmission facilities or system upgrades unless and \nuntil the conditions stated in Section 9.2.1 hereof have been satisfied. \n8.3. \nRequest for FERC Deference Regarding Need Determination.  It is intended \nthat FERC grant substantial deference to the factual determinations of the CAISO, \n(including the CAISO’s ADR Procedures), the CPUC, WECC, or RTG \ncoordinated planning processes as to the need for or construction of a facility, the \nneed for full cost recovery, and the allocation of costs. \n9. \nExpansion Process. \n9.1. \nDetermination of Facilities.  A Participating TO shall perform a Facilities Study \nin accordance with this Section where (1) the Participating TO is obligated to \nconstruct or expand facilities in accordance with Section 24 of the CAISO Tariff \nand this TO Tariff; (2) a Market Participant agrees to pay the costs of the \nFacilities Study and specifies the project objectives to be achieved in terms of \nincreased capacity or reduced congestion; or (3) the Participating TO is required \nto perform a Facilities Study pursuant to the CAISO Tariff. \n9.1.1. Payment of Facilities Study Costs. \n9.1.1.1. Market Participant to Pay for Facilities Study.  Where a \nMarket Participant requests a Facilities Study and the need for \nthe transmission addition or upgrade has not yet been \nestablished in accordance with the procedures established \nherein and the CAISO Tariff, the Market Participant shall pay \nthe cost of the Facilities Study."},{"page":186,"startToken":67450,"endToken":67890,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \n9.1.1.2. Project Sponsor or Project Proponent to Pay for Facilities \nStudy.  Where the facilities to be added or upgraded have \nbeen determined to be needed in accordance with the \nprocedures established herein and the CAISO Tariff, the \nProject Sponsor, Project Proponent, or the CAISO requesting \nthe study shall pay the reasonable cost of the Facilities Study. \nWhen the Participating TO is the Project Sponsor in \naccordance with the CAISO Tariff, the costs of the Facilities \nStudy shall be recovered through its Access Charges and \ntransmission rates. \n9.1.1.3. Principal Beneficiaries to Pay for Facilities Study.  Where \nthe facilities to be added or upgraded have been determined to \nbe needed and the principal beneficiaries have been identified \nby the CAISO or CAISO ADR Procedures in accordance with \nthe CAISO Tariff, the Project Sponsor and the identified \nprincipal beneficiaries shall pay the reasonable cost of the \nFacilities Study, in such proportions as may be agreed, or, \nfailing agreement, as determined in accordance with the \nCAISO ADR Procedures. \n9.1.2. Payment Procedure.  Where a Facilities Study is being conducted \npursuant to this TO Tariff, the Participating TO shall, within thirty (30) \ndays of the receipt of all reasonably required information, tender to the \nMarket Participant, Project Sponsor, Project Proponent, CAISO, or \nidentified principal beneficiaries, as the case may be, a Facilities Study \nAgreement that defines the scope, content, assumptions, and terms of \nreference for such study, the estimated time required to complete it, and \nsuch other provisions as the parties may reasonably require and pursuant \nto which such Market Participant, Project Sponsor, Project Proponent, the \nCAISO, or identified principal beneficiaries agree to reimburse the \nParticipating TO the reasonable cost of performing the required Facilities \nStudy. If the Market Participant, Project Sponsor, Project Proponent, the \nCAISO, or identified principal beneficiaries, as the case may be, agree to \nthe terms of the Facilities Study Agreement, they shall execute the \nFacilities Study Agreement and return it to the Participating TO within ten \n(10) Business Days.  Alternatively, if the Market Participant, Project \nSponsor, Project Proponent, the CAISO, or identified principal \nbeneficiaries, as the case may be, request the Participating TO to proceed \nwith the Facilities Study and commit to abide by the terms, conditions, and \ncost assignments ultimately determined under the CAISO ADR \nProcedures, including any determination by FERC or appeal of a FERC \ndetermination in accordance with that process, the Participating TO shall \npromptly proceed with the Facilities Study, and the parties shall submit the \ndisputed terms for resolution under the CAISO’s ADR Procedures."},{"page":187,"startToken":67890,"endToken":68366,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \n9.1.3. Facilities Study Procedures.  Upon receipt of an executed Facilities \nStudy Agreement or alternative request to proceed as provided for in \nSection 9.1.2, a copy of which has been provided to the CAISO by the \nparty requesting the Facilities Study, the Participating TO will use due \ndiligence to complete the required Facilities Study within a sixty (60) day \nperiod.  If the Participating TO is unable to complete the Facilities Study \nin the allotted time period, the Participating TO shall notify the party \nrequesting the Facilities Study and provide an estimate of the time needed \nto reach a final determination along with an explanation of the reasons that \nadditional time is required to complete the Facilities Study.  If additional \ntime is required, the Participating TO will use best efforts to complete the \nFacilities Study within ten (10) months, provided adequate information is \nprovided by all the parties. \n9.2. \nObligation to Build. \n9.2.1. Due Diligence to Construct.  Subject to Section 9.3.3 of this TO Tariff, \nthe Participating TO shall use due diligence to construct, within a \nreasonable time, additions or upgrades to its transmission system that it is \nobligated to construct pursuant to the CAISO Tariff and this TO Tariff.  \nAlternatively, if a Market Participant requests the Participating TO to file \nan unexecuted Participation Agreement and commits to abide by the \nterms, conditions, and cost assignments determined to be just and \nreasonable under the CAISO ADR Procedures, including any \ndetermination by FERC or on appeal of a FERC determination in \naccordance with that process, the Participating TO shall promptly file an \nunexecuted Participation Agreement. Provided, however, that if the \nCAISO ADR Procedures concerns whether the requesting entity is an \nEligible Customer, the Participating TO shall not be obligated to file an \nunexecuted Participation Agreement or alternatively, if a Market \nParticipant requests the Participating TO to file an unexecuted \nParticipation Agreement and commits to abide by the terms, conditions, \nand cost assignments determined to be just and reasonable under the \nCAISO ADR Procedures, including any determination by FERC or on \nappeal of a FERC determination in accordance with that process, the \nParticipating TO shall promptly file an unexecuted Participation \nAgreement. Provided, however, that if the CAISO ADR Procedures \nconcerns whether the requesting entity is an Eligible Customer, the \nParticipating TO shall not be obligated to file an unexecuted Participation \nAgreement, commence construction of the additions or upgrades or incur \nother costs under the Participation Agreement until a final order \ndetermining the just and reasonable rates, terms, and conditions for such \nParticipation Agreement has been issued by the applicable court or \nregulatory authority.   The Participating TO’s obligation to build will be \nsubject to: 1) its ability, after making a good faith effort, to obtain the"},{"page":188,"startToken":68366,"endToken":68820,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \nnecessary approvals and property rights under applicable federal, state, \nand local laws; 2) the presence of a cost recovery mechanism with cost \nresponsibility assigned in accordance with the CAISO Tariff; and 3) a \nsigned Participation Agreement. The Participating TO will not construct or \nexpand its existing or planned transmission system if doing so would \nimpair system reliability as determined through systems analysis based on \nthe Applicable Reliability Criteria. \n9.2.2. Delay in Construction or Expansion.  If any event occurs that will \nmaterially affect the time for completion of new facilities, or the ability to \ncomplete them, the Participating TO shall promptly notify: (1) the Project \nSponsor with regard to facilities determined to be needed; (2) the Parties \nto the Participation Agreement with regard to facilities determined to be \nneeded pursuant to the CAISO Tariff where principal beneficiaries were \nidentified; and (3) the CAISO.  In such circumstances, the Participating \nTO shall, within thirty (30) days of notifying such Project Sponsor, Parties \nto the Participation Agreement, and the CAISO of such delays, convene a \ntechnical meeting with such Project Sponsor, Parties to the Participation \nAgreement, and the CAISO to discuss the circumstances which have \narisen and evaluate any options available. The Participating TO also shall \nmake available to such Project Sponsor, Parties to the Participation \nAgreement, and the CAISO, as the case may be, studies and work papers \nrelated to the cause and extent of the delay and the Participating TO’s \nability to complete the new facilities, including all information that is in \nthe possession of the Participating TO that is reasonably needed to \nevaluate the alternatives. \n9.2.2.1. Alternatives to the Original Facility Additions.  If the \nreview process of Section 9.2.2 determines that one or more \nalternatives exist to the originally planned construction \nproject, the Participating TO shall present such alternatives for \nconsideration to the Project Sponsor, Parties to the \nParticipation Agreement, and the CAISO, as the case may be. \nIf upon review of any alternatives, such Project Sponsor, the \nCAISO, or Parties to the Participation Agreement wish to \nevaluate or to proceed with one of the alternative additions or \nupgrades, such Project Sponsor, the CAISO, or Parties to the \nParticipation Agreement may request that the Participating TO \nprepare a revised Facility Study pursuant to Sections 9.1.1, \n9.1.2, and 9.1.3 of this TO Tariff. In the event the \nParticipating TO concludes that no reasonable alternative \nexists to the originally planned addition or upgrade and the \nProject Sponsor or Parties to the Participation Agreement or \nthe CAISO disagree, the dispute shall be resolved pursuant to \nthe CAISO ADR Procedure"},{"page":189,"startToken":68820,"endToken":69226,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \n9.2.2.2. Refund Obligation for Unfinished Facility Additions.  If \nthe Participating TO and the Project Sponsor, the CAISO, or \nParties to the Participation Agreement, as the case may be, \nmutually agree that no other reasonable alternatives exist, the \nobligation to construct the requested additions or upgrades \nshall terminate and any deposit not yet applied toward the \nexpended project costs shall be returned with interest pursuant \nto FERC Regulation 35.19(a)(2)(iii).  However, the Project \nSponsor and any identified principal beneficiaries, as the case \nmay be, shall be responsible for all costs prudently incurred \nby the Participating TO through the time the construction was \nsuspended. \n9.3. \nProvisions Relating To Transmission Construction on the Systems of Other \nTOs. \n9.3.1. Responsibility for Third Party Additions.  A Participating TO shall not \nbe responsible for making arrangements for any engineering, permitting, \nand construction of any transmission or distribution facilities on the \nsystem(s) of any other entity or for obtaining any regulatory approval for \nsuch facilities. The Participating TO will undertake reasonable efforts \nthrough the coordinated planning process to assist in making such \narrangements, including, without limitation, providing any information or \ndata required by such other electric system pursuant to Good Utility \nPractice. \n9.3.2. Coordination of Third-Party System Additions.  Where transmission \nadditions or upgrades being built pursuant to the CAISO Tariff require \nadditions or upgrades on other systems, to the extent consistent with this \nTO Tariff, the Participating TO shall coordinate construction on its own \nsystem with the construction required by others. The Participating TO, \nafter consultation with the CAISO, the Project Sponsor, and Parties to the \nParticipation Agreement, as the case may be, may defer construction if the \nnew transmission facilities on another system cannot be completed in a \ntimely manner. The Participating TO shall notify such Project Sponsor, \nParties to the Participation Agreement, and the CAISO, in writing of the \nbasis for any decision to defer construction and the specific problems \nwhich must be resolved before it will initiate or resume construction of the \nnew facilities. Within forty (40) Business Days of receiving written \nnotification by the Participating TO of its intent to defer construction \npursuant to this section, such Project Sponsor, Parties to the Participation \nAgreement, or the CAISO may challenge the decision in accordance with \nthe CAISO ADR Procedure. \n10. \nInterconnection Process."},{"page":190,"startToken":69226,"endToken":69608,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \n10.1. Applicability.  All requests for Interconnection directly to the CAISO Controlled \nGrid from parties eligible to request such Interconnection consistent with Section \n210(a) of the FPA shall be processed pursuant to the provisions of this Section \n10., except for requests for Interconnection from Large Loads.  Large Load \nrequests for Interconnection shall be processed pursuant to Appendix IV to this \nTariff.  All requests for Interconnection of wholesale generation directly to the \nCAISO Controlled Grid shall be processed pursuant to the provisions of the \nCAISO Tariff. \n10.2. Applications.  Except as provided in Section 10.1, a party requesting \nInterconnection shall submit written Interconnection Application which provides \nthe information required in Section 10.3 to the Participating TO and shall send a \ncopy of the application to the CAISO. The Participating TO shall time-stamp the \napplication to establish study priority. \n10.3. Interconnection Application.  An Interconnection Application shall provide all \nof the information listed in 18 C.F.R. § 2.20, including, but not limited to, the \nfollowing: \n(i) \nThe identity, address, telephone number, and facsimile number of the entity \nrequesting Interconnection; \n(ii) \nThe Interconnection point(s) to the CAISO Controlled Grid contemplated by \nthe applicant; \n(iii) \nThe resultant (or new) maximum amount of Interconnection capacity \ncontemplated by the applicant; \n(iv) \nThe proposed date for energizing the Interconnection and the term of \nInterconnection service; and \n(v) \nSuch other information as the Participating TO reasonably requires to \nprocess the application. \n \nIn addition to the information specified above, the following information may also \nbe provided in order to properly evaluate system conditions: \n \n(vi) \nIf the applicant is a Load, the electrical location of the source of the power \n(if known) to be transmitted pursuant to the applicant’s request for \nInterconnection. If the source of the power is not known, a system purchase \nwill be assumed.; \n(vii) \nThe electrical location of the ultimate load (if known). If the location of the \nload is not known, a system sale will be assumed.; \n(viii) If an applicant proposes to perform or cause a third party to perform any \nrequired System Impact Study or any required Facilities Study, it shall so \nindicate in its Interconnection Application.  The results of any study or"},{"page":191,"startToken":69608,"endToken":70050,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \nstudies performed by an applicant or its designated third party must be \napproved by both the CAISO and the Participating TO. \n \nWithin ten (10) Business Days after receipt of an Interconnection Application, the \nParticipating TO and the CAISO, if applicable, shall determine whether the \napplication is complete (“Completed Interconnection Agreement”). Whenever \npossible, the Participating TO will attempt to remedy deficiencies in the \nInterconnection Application through informal communications with the applicant. \nIf such efforts are unsuccessful, the Participating TO shall return the \nInterconnection Application to the applicant. The Participating TO will treat the \ninformation in the Interconnection Agreement, including the applicant’s identity, \nas confidential at the request of the applicant except to the extent that disclosure of \nthe information is required by this TO Tariff, by regulatory or judicial order, for \nreliability purposes pursuant to Good Utility Practice, or pursuant to RTG or \nCAISO transmission information sharing agreements. The Participating TO shall \ntreat this information consistent with the standards of conduct contained in Part 37 \nof FERC’s regulations. \n10.3.1. Amendment to Completed Interconnection Application.  An \napplicant shall only be limited to amending its Completed \nInterconnection Application once.  Additional amendments will be at \nthe Participating TO’s discretion, to be permitted on a not unduly \ndiscriminatory basis and without undue preference or advantage, and the \nParticipating TO’s agreement for applicant to make additional \namendment shall not be unreasonably withheld.  Such amendment shall \noccur on or before ten (10) Business Days following the date the \nParticipating TO tenders any Facilities Study Agreement. Specifically, \nan applicant may submit an amendment to its Completed \nInterconnection Application to reflect a revised configuration for its \nNew Facility. The amended Completed Interconnection Application \nshall be treated in accordance with Section 25 of the CAISO Tariff and \nSection 10.5 of this TO Tariff; the applicant’s Completed \nInterconnection Application shall be deemed withdrawn; and the \napplicant shall maintain its existing queue position, if (a) the amended \nCompleted Interconnection Application is received by the Participating \nTO within ten (10) Business Days of the Participating TO’s tender of a \nFacilities Study Agreement; and (b) the applicant has not submitted a \nprevious amendment to the Completed Interconnection Application. In \nthe event an applicant amends its Completed Interconnection \nApplication, it will be responsible for any additional study costs that \nresult from that amendment, including costs associated with revisions to \nstudies for other applicants holding later queue positions. \n10.4. Review of Completed Interconnection Application.  After receiving a \nCompleted Interconnection Application, the Participating TO and the CAISO, if \napplicable, will determine on a non-discriminatory basis whether a System Impact"},{"page":192,"startToken":70050,"endToken":70577,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \nStudy is required. Whenever the Participating TO, and the CAISO, if applicable, \ndetermines that a System impactImpact Study is not required and that neither \nReliability Upgrades nor changes in existing operating procedures are required, \nthe Participating TO shall notify the applicant within fifteen (15) Business Days \nof the Completed Application Date. If the Interconnection can be accommodated \nwithout any Direct Assignment Facilities, then within thirty (30) Business Days of \nsuch notice from the Participating TO, the applicant shall request the Participating \nTO to tender to the applicant an Interconnection Agreement within thirty (30) \nBusiness Days of such request. The Participating TO shall tender to the applicant \nan Interconnection Agreement as provided in Section 8.1.3. If the Participating \nTO determines upon review of the Completed Interconnection Application, that \nDirect Assignment Facilities are required, the Participating TO shall tender to the \napplicant a Facilities Study Agreement within twenty (20) Business Days of the \nCompleted Application Date and continue the Interconnection process pursuant to \nSection 10.8 \n10.5. Notice of Need for System Impact Study.  If the Participating TO, and the \nCAISO if applicable, determines that a System Impact Study is necessary to \naccommodate the requested Interconnection, the Participating TO shall so inform \nthe applicant as soon as practicable. In such cases, the Participating TO shall \nwithin twenty (20) Business Days of receipt of a Completed Application, tender a \nSystem Impact Study Agreement that defines the scope, content, assumptions and \nterms of reference for such study to be completed by the Participating TO, the \nestimated time required to complete it, and such other provisions as the parties \nmay reasonably require, and pursuant to which the applicant shall agree to \nreimburse the Participating TO for the reasonable actual costs of performing the \nrequired System Impact Study.  A description of the Participating TO’s \ntransmission assessment practices for completing a System Impact Study shall be \nprovided in the Participating TO’s FERC Form 715.  Alternatively, if the \napplicant will perform the System Impact Study, the Participating TO shall within \ntwenty (20) Business Days of receipt of a Completed Interconnection Application, \ntender a System Impact Study Agreement that defines the scope, content, \nassumptions and terms of reference for such study to be reviewed by the \nParticipating TO; the estimated time required to complete it; and such other \nprovisions as the parties may reasonably require, and pursuant to which the \napplicant shall agree to reimburse the Participating TO for the reasonable actual \ncosts of reviewing the required System Impact Study.  For an Interconnection \nrequest to remain a Completed Interconnection Application, the applicant shall \nexecute the System Impact Study Agreement and return it to the Participating TO \nwithin ten (10) Business Days together with payment for the reasonable estimated \ncost of performing the System Impact Study or reviewing the applicant’s System \nImpact Study.  Alternatively, if the applicant request the Participating TO to \nproceed with the System Impact Study or review thereof and commits to abide by \nthe terms, conditions, and cost assignments ultimately determined under the \nCAISO ADR Procedures, including any determination by FERC or appeal of a"},{"page":193,"startToken":70577,"endToken":71072,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \nFERC determination in accordance with that process, the Participating TO shall \npromptly proceed with the System Impact Study provided that such request is \naccompanied by payment of the reasonable estimated cost of the System Impact \nStudy, and the parties shall submit the disputed terms for resolution under the \nCAISO’s ADR Procedures.  If the applicant elects not to execute a System \nImpact Study Agreement, and does not request that the Participating TO proceed \nwith the System Impact Study or review thereof, its application shall be deemed \nwithdrawn, and the applicant shall reimburse to the Participating TO and the \nCAISO all costs reasonably incurred in processing the application. \n10.6. System Impact Study Cost Reimbursement and Agreement. \n10.6.1. Cost Reimbursement.  The System Impact Study Agreement shall \nclearly specify the charge for the System Impact Study, based on the \nParticipating TO’s estimate of the cost and time for completion of the \nSystem Impact Study. The charge shall not exceed the reasonable cost of \nthe study. In performing the System Impact Study, the Participating TO \nshall rely, to the extent reasonably practicable, on existing transmission \nplanning studies. The applicant will not be assessed a charge for such \nexisting studies; however, the applicant will be responsible for the \nreasonable charges associated with any modifications to existing \nplanning studies that are reasonably necessary to evaluate the impact of \nthe applicant’s request. \n10.6.2. Multiple Parties.  If multiple parties request Interconnection at the \nsame location, the Participating TO may conduct a single System Impact \nStudy. The costs of that study shall be pro-rated among the parties \nrequesting Interconnection. \n10.7. System Impact Study Procedures.  Upon receipt of an executed System Impact \nStudy Agreement or initiation of the CAISO ADR Procedures and receipt of \npayment for estimated study costs, the Participating TO will use due diligence to \n(a) complete the required System Impact Study within a sixty (60) calendar day \nperiod or (b) complete its review of an applicant’s System Impact Study within \nthirty (30) calendar days of its receipt of the completed study. The System Impact \nStudy will identify whether any Direct Assignment Facilities or Reliability \nUpgrades are necessary to deliver a New Facility’s full output over the CAISO \nControlled Grid, or any transmission additions or upgrades are necessary to serve \na wholesale load. The System Impact Study will also identify any adverse impact \non Encumbrances existing as of the applicant’s Completed Application Date.  In \nthe event that the Participating TO is unable to complete the required System \nImpact Study within such time period, it shall so notify the applicant, in writing, \nand provide an estimated completion date along with an explanation of the \nreasons why additional time is required to complete the required studies. A copy \nof the completed System Impact Study and related work papers shall be made \navailable to the applicant and the CAISO.  The Participating TO shall notify the"},{"page":194,"startToken":71072,"endToken":71571,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \napplicant and the CAISO immediately upon completion of the System Impact \nStudy. \n10.7.1. Procedures Upon Completion of System Impact Study.  Within \nfifteen (15) Business Days of completion of the System Impact Study or \nreview and approval of an applicant’s System Impact Study, the \nParticipating TO shall notify the applicant whether the transmission \nsystem will be adequate to accommodate all of a request for \nInterconnection. If no costs are likely to be incurred for any Direct \nAssignment Facilities, any Reliability Upgrades, or implementing any \noperating procedures, then within thirty (30) Business Days of receipt of \nwritten approval of the applicant’s System Impact Study from the \nParticipating TO and the CAISO the applicant shall request the \nParticipating TO to tender an Interconnection Agreement within thirty \n(30) Business Days of such request. The Participating TO shall tender to \nthe applicant an Interconnection Agreement as provided in Section 8.1.3. \nIf costs are likely to be incurred to accommodate a request for \nInterconnection, the Participating TO shall tender to the applicant a \nFacilities Study Agreement pursuant to Section 10.8. \n10.8. Notice of Need for Facilities Study.  If a System Impact Study indicates that \nadditions or upgrades to the CAISO Controlled Grid are needed to satisfy an \napplicant’s request for interconnection, the Participating TO shall, within fifteen \n(15) Business Days of the date of the System Impact Study or the completion of \nreview and approval of the applicant’s System Impact Study by the Participating \nTO, tender to the applicant a Facilities Study Agreement that defines the scope, \ncontent, assumptions and terms of reference for such study to be completed by the \nParticipating TO; the estimated time required to complete the required study; and \nsuch other provisions as the parties may reasonably require, and pursuant to \nwhich the applicant agrees to reimburse the Participating TO for the reasonable \nactual costs of performing the required Facilities Study. Alternatively, if the \napplicant will perform the Facilities Study, the Participating TO shall within \nfifteen (15) Business Days of the completion date of the System Impact Study or \nthe completion of review and approval of the applicant’s System Impact Study, \ntender a Facilities Study Agreement that defines the scope, content, assumptions \nand terms of reference for such study to be reviewed by the Participating TO; the \nestimated time required to complete the required review; and such other \nprovisions as the parties may reasonably require, and pursuant to which the \napplicant agrees to reimburse the Participating TO for the reasonable actual costs \nof reviewing the required Facilities study. For an Interconnection request to \nremain a Completed Interconnection Application, the applicant shall execute the \nFacility Studies Agreement and return it to the Participating TO within ten (10) \nBusiness Days together with payment for the reasonable estimated costs of \nperforming the Facilities Study or reviewing the applicant’s Facilities Study. \nAlternatively, if the applicant request the Participating TO to proceed with the"},{"page":195,"startToken":71571,"endToken":72066,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \nFacilities Study to review thereof and commits to abide by terms, conditions, and \ncost assignments ultimately determined under the CAISO ADR Procedures, \nincluding any determination by FERC or appeal of a FERC determination in \naccordance with that process, the Participating TO shall promptly proceed with \nthe Facilities Study provided that such request is accompanied by payment for the \nreasonable estimated cost of the Facilities Study, and the parties shall submit the \ndisputed terms for resolution under the CAISO ADR Procedures. If the applicant \nelects not to execute a Facilities Study Agreement and does not request that the \nParticipating TO proceed with the Facilities Study or review thereof, its \napplication shall be deemed withdrawn and the applicant shall reimburse to the \nParticipating TO all costs reasonably incurred in processing the application not \ncovered by the System Impact Study Agreement. \n10.9. Facilities Study Procedures.  Upon receipt of an executed Facilities Study \nAgreement or initiation of the CAISO ADR Procedures and receipt of payment for \nthe estimated study costs, the Participating TO will use due diligence to either (a) \ncomplete the required Facilities Study within a sixty (60) calendar day period or \n(b) complete its review of an applicant’s Facilities Study within thirty (30) \ncalendar days of its receipt of the Completed Study. In the event that Participating \nTO is unable to complete the required Facilities Study within such time period, it \nshall so notify the applicant, in writing, and provide an estimated completion date \nalong with an explanation of the reasons why additional time is required to \ncomplete the required studies. A copy of the completed Facilities Study shall be \nmade available to the applicant. \n10.9.1. Execution of Interconnection Agreement.  Within thirty (30) \nBusiness Days of receipt of the completed Facilities Study performed by \nthe Participating TO or receipt of written approval of the applicant’s \nFacilities Study from the Participating TO, the applicant shall request the \nParticipating TO to tender an Interconnection Agreement within thirty \n(30) Business Days of such request. The Participating TO shall tender to \nthe applicant an Interconnection Agreement as provided in Section 8.1.3. \n10.10. Partial Interim Service.  If the Participating TO determines that there will not \nbe adequate transmission capability to satisfy the full amount requested in a \nCompleted Interconnection Application, the Participating TO nonetheless shall be \nobligated to offer and provide the portion of the requested Interconnection that \ncan be accommodated without any additional Direct Assignment Facilities or \nReliability Upgrades. However, the Participating TO shall not be obligated to \nprovide the incremental amount of requested Interconnection that requires such \nadditional facilities or upgrades until such facilities or upgrades have been placed \nin service. \n10.11. Expedited Procedures for New Facilities.  In lieu of the procedures set forth \nabove, the applicant shall have the option to expedite the processing of its \nCompleted Interconnection Application.  In order to exercise this option, the"},{"page":196,"startToken":72066,"endToken":72566,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \napplicant shall submit in writing a Request for Expedited Interconnection \nProcedures to the Participating TO within ten (10) Business Days after receiving a \ncopy of the System Impact Study for the proposed Interconnection. Within ten \n(10) Business Days after receiving a Request for Expedited Procedures, the \nParticipating TO shall tender an Expedited Interconnection Agreement that \nrequires the applicant to compensate the Participating TO for all costs reasonably \nincurred pursuant to the terms of this TO Tariff for processing the Completed \nInterconnection Application and providing the requested Interconnection. While \nthe Participating TO agrees to provide the applicant with its best estimate of the \ncosts of any needed Direct Assignment Facilities and, if applicable, Reliability \nUpgrades, and such other charges that may be incurred, unless otherwise agreed \nby the parties, such estimate shall not be binding and the applicant must agree in \nwriting to compensate the Participating TO for all actual Interconnection costs \nreasonably incurred pursuant to the provisions of this TO Tariff. The applicant \nshall execute and return such Expedited Service Agreement within ten (10) \nBusiness Days of its receipt or the applicant’s request for Interconnection will \ncease to be a Completed Interconnection Application and will be deemed \nterminated and withdrawn, In that event, the applicant shall reimburse the \nParticipating TO for all costs reasonably incurred in processing the application \nnot covered by the terms of the System Impact Study Agreement. \n \n11. \nUncontrollable Forces and Indemnification. \n11.1. Procedures to Follow if Uncontrollable Force Occurs.  In the event of the \noccurrence of an Uncontrollable Force which prevents a Party from performing \nany of its obligations under this TO Tariff, such Party shall (i) immediately notify \nthe other Parties in writing of the occurrence of such Uncontrollable Force, (ii) \nnot be entitled to suspend performance in any greater scope or longer duration \nthan is required by the Uncontrollable Force, (iii) use its best efforts to mitigate \nthe effects of such Uncontrollable Force, remedy its inability to perform, and \nresume full performance hereunder, (iv) keep the other Parties apprised of such \nefforts on a continual basis and (v) provide written notice of the resumption of \nperformance hereunder. Notwithstanding any of the foregoing, the settlement of \nany strike, lockout, or labor dispute constituting an Uncontrollable Force shall be \nwithin the sole discretion of the Party to this TO Tariff involved in such strike, \nlockout, or labor dispute and the requirement that a Party must use its best efforts \nto remedy the cause of the Uncontrollable Force and mitigate its effects and \nresume full performance hereunder shall not apply to strikes, lockouts, or labor \ndisputes. No Party will be considered in default as to any obligation under this TO \nTariff if prevented from fulfilling the obligation due to the occurrence of an \nUncontrollable Force. \n11.2. Indemnification.  A Market Participant shall at all times indemnify, defend, and \nsave the Participating TO harmless from any and all damages, losses, claims,"},{"page":197,"startToken":72566,"endToken":73057,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \n(including claims and actions relating to injury or to death of any person or \ndamage to property), demands, suits, recoveries, costs and expenses, court costs, \nattorney fees, and all other obligations by or to third parties, arising out of or \nresulting from the Participating TO's performance of its obligations under this TO \nTariff on behalf of a Market Participant, except in cases of negligence or \nintentional wrongdoing by the Participating TO. \n12. \nRegulatory Filings.  Nothing contained herein shall be construed as affecting, in any \nway, the right of DCRT to unilaterally make application to FERC as it deems necessary \nand appropriate to recover its TRR, or for a change in its terms and conditions, including \nchanges in rate methodology, or for a change in designation of transmission Entitlements \nto be placed under the CAISO’s control, pursuant to the applicable FERC rules, \nregulations, policies, and governing statutes. \n13. \nMiscellaneous. \n13.1. Notices.  Any notices, demand, or request in accordance with this TO Tariff, \nunless otherwise provided in this TO Tariff, shall be in writing and shall be \ndeemed properly served, given, or made: (i) upon delivery if delivered in person, \n(ii) five days after deposit in the mail if sent by first class United States mail, \npostage prepaid, (iii) upon receipt of confirmation by return electronic facsimile if \nsent by facsimile, or (iv) upon delivery if delivered by prepaid commercial courier \nservice, in each case addressed to a Party at the address set forth in Appendix II. \nAny Party may at any time, by notice to the other Parties, change the designation \nor address of the person specified in Appendix II to receive notice on its behalf. \nAny notice of a routine character in connection with service under this TO Tariff \nshall be given in such a manner as the Parties may determine from time to time, \nunless otherwise provided in this TO Tariff. \n13.2. Waiver.  Any waiver at any time by any Party of its rights with respect to any \ndefault under this TO Tariff, or with respect to any other matter arising in \nconnection with this TO Tariff, shall not constitute or be deemed a waiver with \nrespect to any subsequent default or other matter arising in connection with this \nTO Tariff. Any delay short of the statutory period of limitations in asserting or \nenforcing any right shall not constitute or be deemed a waiver. \n13.3. Confidentiality. \n13.3.1. Maintaining Confidentiality if Not for Public Disclosure.  The \nParticipating TO shall maintain the confidentiality of all of the \ndocuments, data, and information provided to it by any other Party that \nsuch Party may designate as confidential, provided, however, that the \ninformation will not be held confidential by the receiving Party if (1) the \ndesignating Party is required to provide such information for public \ndisclosure pursuant to this TO Tariff or applicable regulatory"},{"page":198,"startToken":73057,"endToken":73535,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \nrequirements, or (2) the information becomes available to the Public on a \nnon-confidential basis (other than from the receiving Party). \n13.3.2. Disclosure of Confidential Information.  Notwithstanding anything in \nthis Section 11.3.2 to the contrary, if any Party is required by applicable \nlaws or regulations, or in the course of administrative or judicial \nproceedings, to disclose information that is otherwise required to be \nmaintained in confidence pursuant to this Section 11.3.2, the Party may \ndisclose such information; provided, however, that as soon as such Party \nlearns of the disclosure requirement and prior to making such disclosure, \nsuch Party shall notify the affected Party or Parties of the requirement \nand the terms thereof. The affected Party or Parties may, at their sole \ndiscretion and own costs, direct any challenge to or defense against the \ndisclosure requirement and the disclosing Party shall cooperate with \nsuch affected Party or Parties to the maximum extent practicable to \nminimize the disclosure of the information consistent with applicable \nlaw. The disclosing Party shall cooperate with the affected Parties to \nobtain proprietary or confidential treatment of confidential information \nby the person to whom such information is disclosed prior to any such \ndisclosure. \n13.4. Titles.  The captions and headings in this TO Tariff are inserted solely to \nfacilitate reference and shall have no bearing upon the interpretation of any of the \nrates, terms, and conditions of this TO Tariff. \n13.5. Severability.  If any term, covenant, or condition of this TO Tariff or the \napplication or effect of any such term, covenant, or condition is held invalid as to \nany person, entity, or circumstance, or is determined to be unjust, unreasonable, \nunlawful, imprudent, or otherwise not in the public interest, by any court or \ngovernment agency of competent jurisdiction, then such term, covenant, or \ncondition shall remain in force and effect to the maximum extent permitted by \nlaw, and all other terms, covenants, and conditions of this TO Tariff and their \napplication shall not be affected thereby but shall remain in force and effect. The \nParties shall be relieved of their obligations only to the extent necessary to \neliminate such regulatory or other determination, unless a court or governmental \nagency of competent jurisdiction holds that such provisions are not severable \nfrom all other provisions of this TO Tariff. \n13.6. Preservation of Obligations.  Upon termination of this TO Tariff, all unsatisfied \nobligations of each Party shall be preserved until satisfied. \n13.7. Governing Law.  This TO Tariff shall be interpreted, governed by, and construed \nunder the laws of the State of California, without regard to the principles of \nconflict of laws thereof, or the laws of the United States, as applicable, as if \nexecuted and to be performed wholly within the State of California."},{"page":199,"startToken":73535,"endToken":73716,"text":"DCR Transmission, L.L.C. \nFERC FPA Transmission Tariff 2.0.0 \nEffective: 12/31/9998 \n \n \n \n \n13.8. Appendices Incorporated.  The appendices to this TO Tariff are attached to this \nTO Tariff and are incorporated by reference as if fully set forth herein. \n13.9. Consistency with CAISO Tariff.  This TO Tariff is intended to be consistent \nwith the CAISO Tariff, and, if necessary, shall be amended to conform with any \nchanges authorized or required in any final order in a FERC proceeding \nmandating such changes in the CAISO Tariff. \n13.10. Disputes.  Except as limited by law, the CAISO ADR Procedures shall apply to \nall disputes between parties which arise under this TO Tariff or under or in respect \nof the proposed terms and conditions of a Facilities Study Agreement, System \nImpact Study Agreement or Expedited Service Agreement. The CAISO ADR \nProcedures set forth in Section 13 of the CAISO Tariff shall not apply to disputes \nas to whether rates and charges set forth in this TO Tariff (other than charges for \nstudies) are just and reasonable under the FPA."},{"page":200,"startToken":73716,"endToken":73724,"text":"APPENDIX IV \n \nLarge Load Interconnection Process and Timeline"},{"page":201,"startToken":73724,"endToken":74199,"text":"2 \n \nAppendix IV \nto the DCRT TO Tariff \n \nLarge Load Interconnection Process and Timeline \n1.1 \nApplicability. This Appendix IV shall govern all requests for Interconnection \nsubmitted by Large Load Interconnection Customers seeking to interconnect a Large \nLoad directly to the Participating TO’s Transmission System. Participating TO shall \ncoordinate with the CAISO to implement the interconnection of a Large Load as needed \npursuant to Section 4.3 to this Appendix IV. Coordination with the CAISO pursuant to \nSection 4.3 of this Appendix IV may require that Participating TO, Large Load \nInterconnection Customer and the CAISO negotiate revised deadlines for the \nprocessing of the Large Load Interconnection Customer’s interconnection request. \nSuch revised deadlines will be included in the Large Load Interconnection Customer’s \nLarge Load System Impact Study Agreement and Large Load Facilities Study \nAgreement included with these procedures as Attachments 1 and 2 to this Appendix IV, \nrespectively.  \n1.2 \nApplication Required. A Large Load Interconnection Customer shall submit a written \nLarge Load Interconnection Application that provides the information required in \nSection 1.4 to this Appendix IV. The Participating TO shall time-stamp the application \nto establish study priority and send a copy to any other transmission providers whose \ntransmission facilities potentially may be impacted by the interconnection of the Large \nLoad Interconnection Customer’s Large Load based on Participating TO’s review of \nthe application. Participating TO will also provide the Large Load Interconnection \nCustomer’s application to the CAISO pursuant to Section 4.3.  \n1.3 \nProcess Overview. Participating TO’s processing of a Large Load Interconnection \nApplication will proceed in four stages: (1) Sufficiency Review of the Large Load \nInterconnection Application; (2) Large Load System Impact Study; (3), Large Load \nFacilities Study; and (4) negotiation of a Large Load Interconnection Agreement based \non the pro forma agreement provided as Attachment 3 to this Appendix IV. In the first \nstage, Participating TO will review the Large Load Interconnection Application for \ncompleteness and sufficiency of the provided information, verify the submitted \ninformation, and provide an opportunity to cure any deficiencies found. In the second \nphase, Participating TO will execute the Large Load System Impact Study Agreement \nincluded as Attachment 1 to this Appendix IV with the Large Load Interconnection \nCustomer; perform the Large Load System Impact Study; submit the study results to \nthe Large Load Interconnection Customer; and conduct a study review meeting with \nthe Large Load Interconnection Customer. In the third phase, Participating TO will \nexecute the Large Load Facilities Study Agreement included as Attachment 2 to this \nAppendix IV and Participating TO will perform the Large Load Facilities Study to \naddress detailed engineering design; submit the study results to the Large Load \nInterconnection Customer; and conduct a final study review meeting with the Large \nLoad Interconnection Customer. In the fourth phase, Participating TO will negotiate \nand execute a Large Load Interconnection Agreement with the Large Load"},{"page":202,"startToken":74199,"endToken":74480,"text":"3 \n \nInterconnection Customer. Participating TO will coordinate with the Large Load \nInterconnection Customer to facilitate any studies required to determine the impact of \nthe Large Load Interconnection Application on Affected Systems.  \n1.4 \nInterconnection Application Contents. A Large Load Interconnection Application \nfrom a Large Load Interconnection Customer shall provide the following: \n(i) \nThe identity, address, telephone number, and email address for the contacts \nfor the entity requesting Interconnection for the relevant Large Load; \n(ii) \nA signed copy of a Large Load System Impact Study Agreement, ready for \nexecution by Participating TO; \n(iii) \nAt least three (3) dates/times the Large Load Interconnection Customer is \navailable to meet with Participating TO within one (1) week of the Large \nLoad Interconnection Application’s submission;  \n(iv) \nThe Point(s) of Interconnection to the Participating TO’s system \ncontemplated by the applicant; \n(v) \nThe resultant (or new) maximum amount of Interconnection capacity \ncontemplated by the Large Load Interconnection Customer; \n(vi) \nThe proposed date for energizing the Large Load and the term of Large Load \nInterconnection Service;  \n(vii) The electrical location of the source of the power (if known) to be transmitted \npursuant to the Large Load Interconnection Customer’s request for \nInterconnection. If the source of the power is not known, a system purchase \nwill be assumed; \n(viii) The electrical location of the ultimate load (if known). If the location of the \nload is not known, a system sale will be assumed; \n(ix) \nEnergization plans and expected in-service dates; \n(x) \nThe following physical characteristics of the prospective Large Load, \nsufficient to characterize expected load behavior, including: \na. \nLoad type \nb. \nVariable or flat load designation \nc. \nExpected hourly operating profile \nd. \nLocation of service \ne. \nPoint of delivery"},{"page":203,"startToken":74480,"endToken":74625,"text":"4 \n \nf. \nConnected capacity \ng. \nAny market participation status or expected participation in demand \nresponse programs \nh. \nMaximum operating demand \ni. \nMinimum operating demand \nj. \nCurtailment capability \nk. \nExpected hourly flexibility capability \nl. \nRamp-up capability \nm. \nRamp-down capability \nn. \nPreliminary site layout \no. \nModelling inputs for steady-state and transient studies \np. \nLocation, size, and connection of every transformer and large motor \nq. \nEvidence of site control \nr. \nAttestation by officer of accuracy of submitted Large Load \nInterconnection Application \n(xi) \nCo-located resource information, if applicable: \na. \nPresence of co-located generation \nb. \nWhether the resource will be fully Behind-the-Meter or may export to \nthe CAISO Controlled Grid \nc. \nResource type \nd. \nNameplate capacity \ne. \nMinimum and maximum operating levels \nf. \nMarket participation status \ng. \nAssociated status resource identifiers \nh. \nAll information required by the Participating TO and, as applicable, the \nCAISO in the Large Generator Interconnection Application"},{"page":204,"startToken":74625,"endToken":75033,"text":"5 \n \n(xii) \nSuch other information as the Participating TO reasonably requires to \nprocess the Large Load Interconnection Application. \n1.4.2 Large Load Interconnection Application Fee. A Large Load Interconnection \nCustomer shall submit a non-refundable application fee of two-hundred-\nthousand dollars ($200,000).  \n1.4.3 Amendment to Completed Large Load Interconnection Application. A \nLarge Load Interconnection Customer shall be limited to only amending its \nLarge Load Interconnection Application once.  Additional amendments will be \nat Participating TO’s discretion, to be permitted on a not unduly discriminatory \nbasis and without undue preference or advantage, and Participating TO’s \nagreement for Large Load Interconnection Customer to make additional \namendment shall not be unreasonably withheld.  Such amendment shall occur \nno later than ten (10) Business Days after the date the Participating TO tenders \nthe Large Load System Impact Study report. Specifically, a Large Load \nInterconnection Customer may submit an amendment to its Interconnection \nApplication to reflect a revised configuration for its Large Load. In the event a \nLarge Load Interconnection Customer amends its Large Load Interconnection \nApplication, it will be responsible for any additional study costs that result from \nthat amendment. \n1.5 \nWithdrawal of Large Load Interconnection Application. A Large Load \nInterconnection Customer may withdraw its Large Load Interconnection Application \nat any time by providing notice to Participating TO in writing. A withdrawal shall not \nresult in the refund of any previously paid application fees.  \n2. Application Processing and Timeline. The Large Load Interconnection Application will be \nprocessed under the procedures and timeline described below: \n2.1 \nSufficiency Review. Within five (5) Business Days of receipt of a Large Load \nInterconnection Application and application fee, Participating TO will complete its \nsufficiency review of the Large Load Interconnection Application and provide the \nLarge Load Interconnection Customer with either a notice of sufficiency or a deficiency \nletter for the Large Load Interconnection Application, via email. A deficiency letter will \nspecify the necessary changes to meet the Large Load Interconnection Application \nrequirements. \n2.1.1 Cure of Deficiency. If a Large Load Interconnection Customer receives a \ndeficiency letter, it will have three (3) Business Days to re-submit a revised \nLarge Load Interconnection Application curing the deficiencies identified in the \ndeficiency letter.  \n2.1.2 Review of Resubmitted Large Load Interconnection Application. If the \nLarge Load Interconnection Customer receives a deficiency letter and timely \nre-submits a revised Large Load Interconnection Application, within five (5) \ncalendar days, Participating TO will conduct another sufficiency review of the"},{"page":205,"startToken":75033,"endToken":75520,"text":"6 \n \nresubmitted application and notify the Large Load Interconnection Customer of \nthe sufficiency or deficiency of the resubmitted application. A second finding \nof deficiency will result in the application being deemed withdrawn.   \n2.2 \nLarge Load System Impact Study. Within seven (7) calendar days of approving a \ncompleted Large Load Interconnection Application, Participating TO and Large Load \nInterconnection Customer shall execute the Large Load System Impact Study \nAgreement included in the initial Large Load Interconnection Application and conduct \nan initial Scoping Meeting. The system impact study will consist of a short circuit \nanalysis, a stability analysis, a power flow analysis, and any other studies that are \ndeemed necessary. The system impact study shall state the assumptions upon which it \nis based, state the results of the analyses, and provide the requirement or potential \nimpediments to providing the requested Large Load Interconnection Service, including \na preliminary indication of the cost and length of time that would be necessary to \ncorrect any problems identified in those analyses and implement the Interconnection.   \nThe Large Load System Impact Study shall provide a list of Large Load \nInterconnection Facilities and Network Upgrades that are required to interconnect the \nrelevant Large Load and provide a non-binding good faith estimate of cost \nresponsibility and the amount of construction time required. The Large Load System \nImpact Study shall also identify any Affected Systems that Participating TO must \ncoordinate with in order to interconnect the Large Load Interconnection Customer.  \n2.2.1 Large Load System Impact Study Fee. If the Large Load System Impact \nStudy costs exceed the Large Load Interconnection Application Fee, the Large \nLoad Interconnection Customer shall reimburse the Participating TO for the \nactual study costs that exceed the initial application fee of two-hundred-\nthousand dollars ($200,000).  \n2.2.2 Large Load System Impact Study Timeline. Within thirty (30) calendar days \nof execution of the Large Load System Impact Study Agreement, Participating \nTO, using reasonable efforts, will perform the Large Load System Impact \nStudy, prepare and submit a study report to the Large Load Interconnection \nCustomer, and provide the Large Load Interconnection Customer with an initial \ndraft Large Load Interconnection Agreement reflecting the results of the Large \nLoad System Impact Study. This draft Large Load Interconnection Agreement \nwill be revised based on the Large Load Facilities Study described in Section \n2.3. Within seven calendar (7) days of submitting the Large Load System \nImpact Study report to the Large Load Interconnection Customer, using \nreasonable efforts, Participating TO will schedule a meeting with the Large \nLoad Interconnection Customer and the CAISO, as applicable pursuant to \nSection 4.3, to review the results of the Large Load System Impact Study. \n2.3 \nLarge Load Facilities Study. The Large Load Facilities Study will be used to create \nthe detailed design of the interconnection facilities used to interconnect the Large Load \nto the Participating TO’s facilities, based on the findings of the Large Load System \nImpact Study."},{"page":206,"startToken":75520,"endToken":75961,"text":"7 \n \n2.3.1 Large Load Facilities Study Timeline. The Large Load Interconnection \nCustomer will have seven (7) calendar days after receiving the Large Load \nSystem Impact Study results to execute a Large Load Facilities Study \nAgreement with Participating TO or its Large Load Interconnection Application \nwill be deemed withdrawn. Within thirty (30) calendar days of execution of the \nLarge Load Facilities Study Agreement, using reasonable efforts, Participating \nTO will conduct the Large Load Facilities Study and submit the study report to \nthe Large Load Interconnection Customer.  \n2.3.2 Large Load Facilities Study Fee. The Large Load Interconnection Customer \nshall submit a non-refundable study fee of two-hundred thousand dollars \n($200,000) upon execution of the Large Load Facilities Study Agreement. If the \nLarge Load Facilities Study costs exceed the study fee, the Large Load \nInterconnection Customer shall promptly reimburse the Participating TO for the \nactual study costs that exceed the default study fee.  \n2.4 \nConsideration of Alternative Transmission Technologies. The Large Load System \nImpact Study and Large Load Facilities Study will consider both traditional Network \nUpgrades and Alternative Transmission Technologies when evaluating options for \nreliably interconnecting the Large Load. Alternative Transmission Technologies to be \nstudied will include, as applicable, static synchronous compensators, static VAR \ncompensators, advanced power flow control devices, transmission switching, \nsynchronous condensers, voltage source converters, advanced conductors, and tower \nlifting. The Participating TO’s studies, will select the best available transmission \nsolution to interconnect Large Load. If a traditional Network Upgrade solution is \nselected instead of Alternative Transmission Technologies, the Participating TO will \nexplain why Alternative Transmission Technologies are not feasible (i.e., would not \nresolve reliability violations identified or meet the relevant planning criteria) or would \nnot result in lower costs or a faster timeline for accommodating the interconnection of \nthe Large Load. \n2.5 \nLarge Load Interconnection Agreement.  \n2.5.1 Large Load Interconnection Agreement Timeline. Within sixty (60) calendar \ndays of receipt of the Large Load Facilities Study report, Large Load \nInterconnection Customer shall execute a Large Load Interconnection \nAgreement with Participating TO or request that an unexecuted Large Load \nInterconnection Agreement be filed with FERC for resolution of any dispute \nover the terms of the Large Load Interconnection Agreement, or the Large Load \nInterconnection Application will be deemed withdrawn.  \n2.5.2 Large Load Interconnection Agreement Signatories and Terms. The Large \nLoad Interconnection Agreement will be negotiated between the Large Load \nInterconnection Customer and Participating TO, with, the CAISO also signing, \nas applicable pursuant to Section 4.3. The Large Load Interconnection \nAgreement will obligate the Large Load Interconnection Customer to pay the \ncost of interconnecting the Large Load to the Participating TO’s system,"},{"page":207,"startToken":75961,"endToken":76375,"text":"8 \n \nincluding procurement, construction, and commissioning of the interconnection \nfacilities based on the terms within the Large Load Interconnection Agreement. \nParticipating TO will not perform any procurement or construction associated \nwith interconnecting the Large Load until the Large Load Interconnection \nAgreement is executed and all funding identified in the Large Load \nInterconnection Agreement is received. The Large Load Interconnection \nAgreement will address reimbursement to the Large Load Interconnection \nCustomer for any Network Upgrades. \n2.5.3 Construction of Interconnection Facilities. Based on the designs produced by \nthe Large Load Facilities Study, Participating TO will procure necessary \nequipment, and construct the interconnection facilities required to interconnect \nthe Large Load to the Participating TO’s system.  \n2.6 \nInterconnection Financial Security Agreements.  A Large Load Interconnection \nCustomer intending to proceed with interconnection shall post financial security \naccording to the timelines identified in Attachment 4 to this Appendix IV, or its \napplication will be deemed withdrawn.  \n2.6.1 Initial Postings. Within ninety (90) calendar days of receipt of the Facilities \nStudy report, a Large Load Interconnection Customer shall execute separate \nInterconnection Financial Security Agreements and post financial security for \neach of: 1) its assigned Network Upgrades; and 2) its Interconnection Facilities. \n2.6.2 Second Postings.  Second postings and amended Interconnection Financial \nSecurity Agreements are required no later than thirty (30) calendar days prior \nto the date on which the Facilities Study report provides that such amounts will \nbe needed to fund long lead time equipment procurement as part of the \nConstruction Activities (as defined in Attachment 4) for the Network Upgrades \n(as defined in Attachment 3) or the Participating TO’s Interconnection \nFacilities, whichever is earlier. \n2.6.3 Third Postings.  No later than thirty (30) calendar days after the date on which \nthe Participating TO provides notice that Participating TO is obligated to \nprovide security needed to fund any additional obligations for Network \nUpgrades (as defined in Attachment 3) or Participating TO’s Interconnection \nFacilities on behalf of the Large Load Interconnection Customer, whichever is \nearlier, the Large Load Interconnection Customer shall modify the two separate \nInterconnection Financial Security instruments. \n3. Flexible Interim Load Interconnection Service.  \n3.1 \nAvailability of Flexible Interim Load Interconnection Service. If a Large Load \nSystem Impact Study conducted for a Large Load Interconnection Customer shows that \nthe Large Load cannot be reliably served at its full requested demand until certain \nNetwork Upgrades are completed, Participating TO will, at the Large Load \nInterconnection Customer’s request offer FILI Service. Based on the study results,"},{"page":208,"startToken":76375,"endToken":76860,"text":"9 \n \nParticipating TO, and, as applicable, the CAISO pursuant to Section 4.3, may propose \na customized plan for the Large Load Interconnection Customer based on the type of \nconstraints required to maintain Transmission System reliability. Such constraints may \nrequire flexibility in demand by the Large Load or any other conditions that \nParticipating TO and, as applicable, the CAISO determine are necessary to maintain \nreliability. The Large Load Interconnection Customer may participate in the design of \nthe FILI Service constraints. Once the required Network Upgrades necessary to serve \nthe Large Load at its full requested demand are complete, the Large Load \nInterconnection Customer may elect to receive firm service.  The scope of any FILI \noffered to the Large Load Interconnection Customer will be memorialized in the Large \nLoad Interconnection Agreement. \n4. Participating TO Obligation to Provide Interconnection Service. \n4.1 \nInterconnection to Transmission System.  Interconnection Services for Large Loads \nmust be consistent with Good Utility Practice, in conformance with all Applicable \nReliability Criteria, all applicable statutes, regulations, the Participating TO’s reliability \ncriteria and, as applicable, the CAISO reliability criteria for the CAISO Controlled \nGrid. The Participating TO will not provide Large Load Interconnection Services to the \nLarge Load Interconnection Customer if doing so would impair reliability. \n4.2 \nEnergization.  The Participating TO shall not be obligated to energize, nor shall the \nLarge Load Interconnection Customer be entitled to have its interconnection to the \nParticipating TO’s system energized, unless and until a Large Load Interconnection \nAgreement has been executed, or filed at FERC pursuant to Section 2.5.1 and becomes \neffective and such Large Load Interconnection Customer has demonstrated to the \nParticipating TO’s reasonable satisfaction that it has complied with all of the \nrequirements of the of the Participating TO’s Tariff, and, as applicable, the CAISO \nTariff. \n4.3 \nCoordination with the CAISO on Interconnection Requests. Participating TO \nreserves the right to coordinate with the CAISO to the extent that the interconnection \nof a Large Load may impact the reliability of the CAISO controlled transmission \nsystem. The potential injection of any power from a Large Load to the Participating \nTO’s Transmission System, including but not limited to the injection of power to the \nParticipating TO’s Transmission System resulting from the colocation of generation \nwith the Large Load facility, shall require that the Participating TO coordinate with the \nCAISO to ensure that the Large Load’s interconnection complies with the CAISO \nTariff.    \n4.4 \nCoordination with Affected Systems. Participating TO will coordinate with the Large \nLoad Interconnection Customer to facilitate any studies required to determine the \nimpact of the Large Load Interconnection Application on Affected Systems. \nParticipating TO may provide a copy of the Large Load System Impact Study and Large \nLoad Facilities Study results to an Affected System Operator and the Western \nElectricity Coordinating Council. Requests for review and input from Affected System \nOperators or the Western Electricity Coordinating Council may arrive at any time prior"},{"page":209,"startToken":76860,"endToken":76927,"text":"10 \n \nto interconnection. If interconnecting the Large Load Interconnection Customer \nrequires upgrades to any Affected Systems, Large Load Interconnection Customer must \nenter into a construction and reimbursement agreement with the owner of any Affected \nSystem and/or other affected owners of portions of the CAISO Controlled Grid that \ngovern facilities built on the relevant Affected System, pursuant to the tariff or \nprocedures of the Affected System owner."},{"page":210,"startToken":76927,"endToken":76949,"text":"Appendix IV \nAttachment 1  \nLarge Load System Impact Study Agreement \nfor Interconnection Requests Processed under the Large Load Interconnection Process and \nTimeline"},{"page":211,"startToken":76949,"endToken":77274,"text":"2 \n \nAttachment 1  \nto the DCRT Large Load Interconnection Process and Timeline  \nDCRT TO Tariff, Appendix IV  \n \nLARGE LOAD SYSTEM IMPACT STUDY AGREEMENT \n[LARGE LOAD INTERCONNECTION CUSTOMER] \nAND \nDCR TRANSMISSION, L.L.C. \nTHIS AGREEMENT is made and entered into this day of ___________, 20__ by and \nbetween ___________, a ___________ organized and existing under the laws of the \nState/Commonwealth of___________, (“Large Load Interconnection Customer”) and DCR \nTransmission, L.L.C., a limited liability company, organized and existing under the laws of the \nState of Delaware, (“DCRT” or “Participating TO”). The Large Load Interconnection Customer \nand DCRT each may be referred to as a “Party,” or collectively as the “Parties.” \nRECITALS \nWHEREAS, Large Load Interconnection Customer is proposing to develop a Large Load \nFacility or Large Load Facility expansion to an existing Large Load Facility consistent with the \nLarge Load Interconnection Application submitted by the Large Load Interconnection Customer \ndated   \n; and \nWHEREAS, the Large Load Interconnection Customer desires to interconnect the Large \nLoad Facility with the California Independent System Operator Corporation (“CAISO”) \nControlled Grid pursuant to the Large Load Interconnection Process; and \nWHEREAS, the Large Load Interconnection Customer has requested DCRT to conduct or \ncause to be performed a Large Load System Impact Study to assess the system impact of \ninterconnecting the Large Load Facility to the CAISO Controlled Grid and to specify and estimate \nthe cost of the equipment, engineering, procurement and construction work needed on the \nParticipating TO’s electric system in accordance with Good Utility Practice to physically and \nelectrically connect the Large Load Facility to the CAISO Controlled Grid; \nNOW, THEREFORE, in consideration of and subject to the mutual covenants contained \nherein the Parties agree as follows: \n1.0 \nWhen used in this Agreement, with initial capitalization, the terms specified shall \nhave the meanings indicated in DCRT’s Federal Energy Regulatory Commission \n(“FERC”)-approved Large Load Interconnection Process in the DCRT Tariff, or \nthe Master Definitions Supplement, Appendix A to the CAISO Tariff, as \napplicable."},{"page":212,"startToken":77274,"endToken":77729,"text":"3 \n \n2.0 \nThe Large Load Interconnection Customer elects and DCRT shall conduct or cause \nto be performed a Large Load System Impact Study in accordance with the DCRT \nTariff, Appendix IV. \n3.0 \nThe scope of the applicable Large Load System Impact Study shall be subject to \nthe assumptions set forth in Appendices A and B to this Agreement. \n4.0 \nThe Large Load System Impact Study will be based upon the technical information \nprovided by the Large Load Interconnection Customer in the Large Load \nInterconnection Application, as may be modified as the result of the Scoping \nMeeting, subject to any modifications in accordance with Section 1.4.2 of the \nDCRT Tariff, Appendix IV and modifications to the proposed Commercial \nOperation Date of the Large Load Facility permitted by the Large Load \nInterconnection Process. DCRT reserves the right to request additional technical \ninformation from the Large Load Interconnection Customer as may reasonably \nbecome necessary consistent with Good Utility Practice during the course of the \nLarge Load System Impact Study. If the Large Load Interconnection Customer \nmodifies its designated Point of Interconnection, Large Load Interconnection \nApplication, or the technical information provided therein is modified, the Large \nLoad System Impact Study may be modified as specified in the DCRT Tariff, \nAppendix IV. \n5.0 \nThe Large Load System Impact Study report shall provide the information specified \nin the Large Load Interconnection Process. \n6.0 \nThe Large Load Interconnection Customer shall provide a Large Load \nInterconnection Application fee for the performance of the Large Load System \nImpact Study in accordance with the provisions of Section 1.4.1 of the Large Load \nInterconnection Process. \n7.0 \nPursuant to Section 4.4 of the Large Load Interconnection Process, DCRT will \ncoordinate with the Large Load Interconnection Customer to facilitate any studies \nrequired to determine the impact of the Large Load Interconnection Application on \nAffected Systems. DCRT may provide a copy of the system impact and facilities \nstudy results to an Affected System Operator and the Western Electricity \nCoordinating Council. Requests for review and input from Affected System \nOperators or the Western Electricity Coordinating Council may arrive at any time \nprior to interconnection. \n8.0 \nSubstantial portions of technical data and assumptions used to perform the Large \nLoad System Impact Study, such as system conditions, existing and planned \ngeneration, and unit modeling, may change after DCRT provides the Large Load \nSystem Impact Study results to the Large Load Interconnection Customer. Large \nLoad System Impact Study results will reflect available data at the time DCRT \nprovides the system impact and facilities study report to the Large Load \nInterconnection Customer. DCRT shall not be responsible for any additional costs, \nincluding, without limitation, costs of new or additional facilities, system upgrades,"},{"page":213,"startToken":77729,"endToken":78165,"text":"4 \n \nor schedule changes, that may be incurred by the Large Load Interconnection \nCustomer as a result of changes in such data and assumptions. \n9.0 \nDCRT shall maintain records and accounts of all costs incurred in performing the \nLarge Load System Impact Study in sufficient detail to allow verification of all \ncosts incurred, including associated overheads. The Large Load Interconnection \nCustomer shall have the right, upon reasonable notice, within a reasonable time at \nDCRT’s offices and at its own expense, to audit DCRT’s records as necessary and \nas appropriate in order to verify costs incurred by DCRT. Any audit requested by \nthe Large Load Interconnection Customer shall be completed, and written notice of \nany audit dispute provided to DCRT representative, within one hundred eighty \n(180) calendar days following receipt by the Large Load Interconnection Customer \nof DCRT’s notification of the final costs of the Interconnection Study. \n10.0  In accordance with Section 1.5 of the Large Load Interconnection Process, the \nLarge Load Interconnection Customer may withdraw its Large Load \nInterconnection Application at any time by written notice to DCRT.  \nWithin ninety (90) days of receiving the withdrawal notice of the Large Load \nInterconnection Application, DCRT will refund the unused amount of the Large \nLoad Interconnection Study Application fee to the Large Load Interconnection \nCustomer.  \n11.0  This Agreement shall become effective upon the date the fully executed Agreement \nis submitted to the Large Load Interconnection Customer by DCRT.  \n12.0 \nMiscellaneous. \n12.1 \nDispute Resolution. Any dispute, or assertion of a claim, arising out of or in \nconnection with this Agreement, shall be resolved in accordance with Section 13.10 \nof the DCRT Tariff. \n12.2 \nConfidentiality. Confidential Information shall be treated in accordance with \nSection 13.3 of the DCRT Tariff. \n12.3 \nBinding Effect. This Agreement and the rights and obligations hereof, shall be \nbinding upon and shall inure to the benefit of the successors and assigns of the \nParties hereto. \n12.4 \nConflicts. In the event of a conflict between the body of this Agreement and any \nattachment, appendices or exhibits hereto, the terms and provisions of the body of \nthis Agreement shall prevail and be deemed the final intent of the Parties. \n12.5 \nRules of Interpretation. This Agreement, unless a clear contrary intention appears, \nshall be construed and interpreted as follows: (1) the singular number includes the \nplural number and vice versa; (2) reference to any person includes such person’s \nsuccessors and assigns but, in the case of a Party, only if such successors and \nassigns are permitted by this Agreement, and reference to a person in a particular"},{"page":214,"startToken":78165,"endToken":78675,"text":"5 \n \ncapacity excludes such person in any other capacity or individually; (3) reference \nto any agreement (including this Agreement), document, instrument or tariff means \nsuch agreement, document, instrument, or tariff as amended or modified and in \neffect from time to time in accordance with the terms thereof and, if applicable, the \nterms hereof; (4) reference to any applicable laws and regulations means such \napplicable laws and regulations as amended, modified, codified, or reenacted, in \nwhole or in part, and in effect from time to time, including, if applicable, rules and \nregulations promulgated thereunder; (5) unless expressly stated otherwise, \nreference to any Article, Section or Appendix means such Article or Section of this \nAgreement or such Appendix to this Agreement, as the case may be; (6) \n“hereunder”, “hereof”, “herein”, “hereto” and words of similar import shall be \ndeemed references to this Agreement as a whole and not to any particular Article, \nSection, or other provision hereof or thereof; (7) “including” (and with correlative \nmeaning “include”) means including without limiting the generality of any \ndescription preceding such term; and (8) relative to the determination of any period \nof time, “from” means “from and including”, “to” means “to but excluding” and \n“through” means “through and including”. \n12.6 \nEntire Agreement. This Agreement, including all Appendices and Schedules \nattached hereto, constitutes the entire agreement between the Parties with reference \nto the subject matter hereof, and supersedes all prior and contemporaneous \nunderstandings or agreements, oral or written, between the Parties with respect to \nthe subject matter of this Agreement. There are no other agreements, \nrepresentations, warranties, or covenants which constitute any part of the \nconsideration for, or any condition to, any Party’ s compliance with its obligations \nunder this Agreement. \n12.7 \nNo Third-Party Beneficiaries. This Agreement is not intended to and does not create \nrights, remedies, or benefits of any character whatsoever in favor of any persons, \ncorporations, associations, or entities other than the Parties, and the obligations \nherein assumed are solely for the use and benefit of the Parties, their successors in \ninterest and, where permitted, their assigns. \n12.8 \nWaiver. The failure of a Party to this Agreement to insist, on any occasion, upon \nstrict performance of any provision of this Agreement will not be considered a \nwaiver of any obligation, right, or duty of, or imposed upon, such Party. \nAny waiver at any time by either Party of its rights with respect to this Agreement \nshall not be deemed a continuing waiver or a waiver with respect to any other failure \nto comply with any other obligation, right, duty of this Agreement. Termination or \ndefault of this Agreement for any reason by the Large Load Interconnection \nCustomer shall not constitute a waiver of the Large Load Interconnection \nCustomer’s legal rights to obtain an interconnection from the Participating TO. Any \nwaiver of this Agreement shall, if requested, be provided in writing. \nAny waivers at any time by any Party of its rights with respect to any default under \nthis Agreement, or with respect to any other matter arising in connection with this"},{"page":215,"startToken":78675,"endToken":79182,"text":"6 \n \nAgreement, shall not constitute or be deemed a waiver with respect to any \nsubsequent default or other matter arising in connection with this Agreement. Any \ndelay, short of the statutory period of limitations, in asserting or enforcing any right \nunder this Agreement shall not constitute or be deemed a waiver of such right. \n12.9 \nHeadings. The descriptive headings of the various Articles and Sections of this \nAgreement have been inserted for convenience of reference only and are of no \nsignificance in the interpretation or construction of this Agreement. \n12.10 Multiple Counterparts. This Agreement may be executed in two or more \ncounterparts, each of which is deemed an original but all constitute one and the \nsame instrument. \n12.11 Amendment. The Parties may by mutual agreement amend this Agreement by a \nwritten instrument duly executed by both of the Parties. \n12.12 Modification by the Parties. The Parties may by mutual agreement amend the \nAppendices to this Agreement by a written instrument duly executed by both of the \nParties. Such amendment shall become effective and a part of this Agreement upon \nsatisfaction of all applicable laws and regulations. \n12.13 Reservation of Rights. DCRT shall have the right to make a unilateral filing with \nFERC to modify this Agreement with respect to any rates, terms and conditions, \ncharges, classifications of service, rule or regulation under section 205 or any other \napplicable provision of the Federal Power Act and FERC’s rules and regulations \nthereunder, and Large Load Interconnection Customer shall have the right to make \na unilateral filing with FERC to modify this Agreement pursuant to section 206 or \nany other applicable provision of the Federal Power Act and FERC’s rules and \nregulations thereunder; provided that each Party shall have the right to protest any \nsuch filing by another Party and to participate fully in any proceeding before FERC \nin which such modifications may be considered. Nothing in this Agreement shall \nlimit the rights of the Parties or of FERC under sections 205 or 206 of the Federal \nPower Act and FERC’s rules and regulations thereunder, except to the extent that \nthe Parties otherwise mutually agree as provided herein. \n12.14 No Partnership. This Agreement shall not be interpreted or construed to create an \nassociation, joint venture, agency relationship, or partnership between the Parties \nor to impose any partnership obligation or partnership liability upon any Party. No \nParty shall have any right, power or authority to enter into any agreement or \nundertaking for, or act on behalf of, or to act as or be an agent or representative of, \nor to otherwise bind, another Party. \n12.15 Assignment. This Agreement may be assigned by a Party only with the written \nconsent of the other Party; provided that a Party may assign this Agreement without \nthe consent of the other Party to any Affiliate of the assigning Party with an equal \nor greater credit rating and with the legal authority and operational ability to satisfy \nthe obligations of the assigning Party under this Agreement; and provided further"},{"page":216,"startToken":79182,"endToken":79407,"text":"7 \n \nthat the Large Load Interconnection Customer shall have the right to assign this \nAgreement, without the consent of the other Party, for collateral security purposes \nto aid in providing financing for the Large Load Facility, provided that the Large \nLoad Interconnection Customer will require any secured party, trustee or \nmortgagee to notify the other Party of any such assignment. Any financing \narrangement entered into by the Large Load Interconnection Customer pursuant to \nthis Section will provide that prior to or upon the exercise of the secured party’s, \ntrustee’s or mortgagee’s assignment rights pursuant to said arrangement, the \nsecured creditor, the trustee or mortgagee will notify the other Party of the date and \nparticulars of any such exercise of assignment right(s). Any attempted assignment \nthat violates this Section is void and ineffective. Any assignment under this \nAgreement shall not relieve a Party of its obligations, nor shall a Party’s obligations \nbe enlarged, in whole or in part, by reason thereof. Where required, consent to \nassignment will not be unreasonably withheld, conditioned or delayed. \nIN WITNESS WHEREOF, the Parties have caused this Agreement to be duly executed by \ntheir duly authorized officers or agents on the day and year first above written. \nDCR Transmission, L.L.C. \nBy:  \n \nPrinted Name:  \n \nTitle:  \n \nDate:  \n \n[Insert name of the Large Load Interconnection Customer] \nBy:  \n \nPrinted Name:  \n \nTitle:  \n \nDate:"},{"page":217,"startToken":79407,"endToken":79485,"text":"Appendix A \n \nASSUMPTIONS USED IN CONDUCTING THE \nSYSTEM IMPACT STUDY \nThe system impact and facilities study will be based upon the information set forth in the \nLarge Load Interconnection Application and agreed upon in the Scoping Meeting held on \n__________, subject to any modifications in accordance with Section 1.4.2 of the Large Load \nInterconnection Process, and the following assumptions: \nDesignation of Point of Interconnection and configuration to be studied. \n[Fill out with application requirements from Appendix IV]"},{"page":218,"startToken":79485,"endToken":79754,"text":"Appendix B  \nData Form, Pre-System Impact \n \nDATA FORM TO BE PROVIDED BY THE LARGE LOAD IS APPLICANT \nPRIOR TO COMMENCEMENT OF THE LARGE LOAD SYSTEM IMPACT STUDY \nLarge Load Facility size (MW):  \n \nProvide two (2) copies of this completed form and other required plans and diagrams in accordance \nwith Section 1.2 of the Large Load Interconnection Process. \nProvide location plan and one-line diagram of the plant and station facilities. For staged projects, \nplease indicate future facility plans, transmission circuits, etc. \nOne set of metering is required for each generation connection to the new bus or existing CAISO \nControlled Grid station. Number of grid connections:  \n \nOn the one line indicate the demand attached at each metering location. (Maximum load on CT/PT) \nOn the one-line indicate the location of auxiliary power. (Minimum load on CT/PT) \nWill an alternate source of auxiliary power be available during CT/PT maintenance?  Yes  No \nWill a transfer bus on the generation side of the metering require that each meter set be designed \nfor the total plant load? \nYes \nNo \n(Please indicate on one-line). \nWhat type of control system or PLC will be located at the Large Load Interconnection Customer’s \nLarge Load Facility? \n \n \n \n \n \nWhat protocol does the control system or PLC use? \n \n \n \n \n \nPlease provide a 7.5-minute quadrangle of the site. Sketch the facility, station, transmission line, \nand property line. \nPhysical dimensions of the proposed interconnection station: \nBus length from load to interconnection station: \nLine length from interconnection station to the Participating TO’s transmission line. \nTower number observed in the field. (Painted on tower leg)*: \nNumber of third-party easements required for transmission lines*:"},{"page":219,"startToken":79754,"endToken":79841,"text":"* To be completed in coordination with the Participating TO or the CAISO. \nLocal service provider for auxiliary and other power:  \n \nPlease provide proposed schedule dates: \nEnvironmental survey start:  \n \nEnvironmental impact report submittal:  \n \nProcurement of project equipment:  \n \nBegin Construction Date:  \n \nIn-Service Date:  \n \nTrial Operation Date:  \n \nCommercial Operation Date:  \n \nRequested Level of Interconnection Service: Choose one of the following: \n \n Firm Service Only \n \n Flexible Interim Load Interconnection (FILI) Service, as applicable \nPlease provide any additional modification request pursuant to Section 1.4.2 of Appendix IV of \nthe DCRT Tariff."},{"page":220,"startToken":79841,"endToken":79862,"text":"Appendix IV \nAttachment 2  \nLarge Load Facilities Study Agreement \nfor Interconnection Requests Processed under the Large Load Interconnection Process and \nTimeline"},{"page":221,"startToken":79862,"endToken":80216,"text":"2 \n \nAttachment 2  \nto the DCRT Large Load Interconnection Process and Timeline  \nDCRT TO Tariff, Appendix IV \nLARGE LOAD FACILITIES STUDY AGREEMENT AND DATA FORM TO BE \nPROVIDED BY THE LARGE LOAD INTERCONNECTION STUDY APPLICANT \nPRIOR TO COMMENCEMENT OF THE INTERCONNECTION FACILITIES STUDY \n[LARGE LOAD INTERCONNECTION CUSTOMER] \nAND \nDCR TRANSMISSION, L.L.C. \nTHIS AGREEMENT is made and entered into this day of ___________, 20__ by and \nbetween ___________, a ___________ organized and existing under the laws of the \nState/Commonwealth of___________, (“Large Load Interconnection Customer”) and DCR \nTransmission, L.L.C., a limited liability company, organized and existing under the laws of the \nState of Delaware, (“DCRT”, or “Participating TO”). The Large Load Interconnection Customer \nand DCRT each may be referred to as a “Party,” or collectively as the “Parties.”  \nRECITALS \nWHEREAS, Large Load Interconnection Customer is proposing to develop a Large Load \nFacility or Large Load Facility expansion to an existing Large Load Facility consistent with the \nLarge Load Interconnection Application submitted by the Large Load Interconnection Customer \ndated   \n; and \nWHEREAS, the Large Load Interconnection Customer desires to interconnect the Large \nLoad Facility with the CAISO Controlled Grid pursuant to the Large Load Interconnection \nProcess; and \nWHEREAS, the Large Load Interconnection Customer has requested DCRT to conduct or \ncause to be performed a Large Load Facilities Study to specify and estimate the cost of the \nequipment, engineering, procurement and construction work needed on the Participating TO’s \nelectric system in accordance with Good Utility Practice to physically and electrically connect the \nLarge Load Facility to the CAISO Controlled Grid; \nNOW, THEREFORE, in consideration of and subject to the mutual covenants contained \nherein the Parties agree as follows: \n1.0 \nWhen used in this Agreement, with initial capitalization, the terms specified shall \nhave the meanings indicated in DCRT’s Federal Energy Regulatory Commission (“FERC”)-\napproved Large Load Interconnection Process in DCRT Tariff, Appendix IV thereto, or the Master \nDefinitions Supplement, Appendix A to the CAISO Tariff, as applicable. \n2.0 \nThe Large Load Interconnection Customer elects and DCRT shall conduct or cause \nto be performed a Large Load Facilities Study in accordance with the DCRT Tariff, Appendix IV."},{"page":222,"startToken":80216,"endToken":80744,"text":"3 \n \n3.0 \nThe scope of the Large Load Facilities Study will be subject to the assumptions set \nforth in and the data provided with this Agreement. \n4.0 \nThe Large Load Facilities Study Report: (i) will provide a description, estimated \ncost of (consistent with Attachment A), schedule for required facilities to interconnect the Large \nLoad Facility to the CAISO Controlled Grid; (ii) will address the issues identified in the voltage, \nshort circuit, stability, and power flow studied conducted as a part of the Large Load System \nImpact Study; and (iii) will reflect the evaluation of alternative transmission technologies in \naccordance with Section 2.4 of the DCRT Tariff, Appendix IV, including, if traditional Network \nUpgrades are selected instead of alternative transmission technologies, an explanation of why \nalternative transmission technologies are not feasible or would not result in lower costs or a faster \ntimeline. \n5.0 \nLarge Load Interconnection Customer will provide a Large Load Facilities Study \nfee for the performance of the Large Load Facilities Study in accordance with the provisions of \nSection 2.3.2 of the Large Load Interconnection Process. The time for completion of the Large \nLoad Facilities Study is specified in the Large Load Interconnection Process in DCRT Tariff, \nAppendix IV. \n6.0 \nMiscellaneous. \n6.1 \nDispute Resolution. Any dispute, or assertion of a claim, arising out of or in \nconnection with this Agreement, shall be resolved in accordance with Section 13.10 of the DCRT \nTariff. \n6.2 \nConfidentiality. Confidential Information shall be treated in accordance with \nSection 13.3 of the DCRT Tariff. \n6.3 \nBinding Effect. This Agreement and the rights and obligations hereof, shall be \nbinding upon and shall inure to the benefit of the successors and assigns of the Parties hereto. \n6.4 \nConflicts. In the event of a conflict between the body of this Agreement and any \nattachment, appendices or exhibits hereto, the terms and provisions of the body of this Agreement \nshall prevail and be deemed the final intent of the Parties. \n6.5 \nRules of Interpretation. This Agreement, unless a clear contrary intention appears, \nshall be construed and interpreted as follows: (1) the singular number includes the plural number \nand vice versa; (2) reference to any person includes such person’s successors and assigns but, in \nthe case of a Party, only if such successors and assigns are permitted by this Agreement, and \nreference to a person in a particular capacity excludes such person in any other capacity or \nindividually; (3) reference to any agreement (including this Agreement), document, instrument \nor tariff means such agreement, document, instrument, or tariff as amended or modified and in \neffect from time to time in accordance with the terms thereof and, if applicable, the terms hereof; \n(4) reference to any applicable laws and regulations means such applicable laws and regulations \nas amended, modified, codified, or reenacted, in whole or in part, and in effect from time to time, \nincluding, if applicable, rules and regulations promulgated thereunder; (5) unless expressly stated \notherwise, reference to any Article, Section or Appendix means such Article or Section of this \nAgreement or such Appendix to this Agreement, as the case may be; (6) “hereunder”, “hereof”,"},{"page":223,"startToken":80744,"endToken":81269,"text":"4 \n \n“herein”, “hereto” and words of similar import shall be deemed references to this Agreement as \na whole and not to any particular Article, Section, or other provision hereof or thereof; (7) \n“including” (and with correlative meaning “include”) means including without limiting the \ngenerality of any description preceding such term; and (8) relative to the determination of any \nperiod of time, “from” means “from and including”, “to” means “to but excluding” and “through” \nmeans “through and including”. \n6.6 \nEntire Agreement. This Agreement, including all Appendices and Schedules \nattached hereto, constitutes the entire agreement between the Parties with reference to the subject \nmatter hereof, and supersedes all prior and contemporaneous understandings or agreements, oral \nor written, between the Parties with respect to the subject matter of this Agreement. There are no \nother agreements, representations, warranties, or covenants which constitute any part of the \nconsideration for, or any condition to, any Party’s compliance with its obligations under this \nAgreement. \n6.7 \nNo Third-Party Beneficiaries. This Agreement is not intended to and does not create \nrights, remedies, or benefits of any character whatsoever in favor of any persons, corporations, \nassociations, or entities other than the Parties, and the obligations herein assumed are solely for \nthe use and benefit of the Parties, their successors in interest and, where permitted, their assigns. \n6.8 \nWaiver. The failure of a Party to this Agreement to insist, on any occasion, upon \nstrict performance of any provision of this Agreement will not be considered a waiver of any \nobligation, right, or duty of, or imposed upon, such Party. \nAny waiver at any time by either Party of its rights with respect to this Agreement shall not be \ndeemed a continuing waiver or a waiver with respect to any other failure to comply with any other \nobligation, right, duty of this Agreement. Termination or default of this Agreement for any reason \nby the Large Load Interconnection Customer shall not constitute a waiver of the Large Load \nInterconnection Customer’s legal rights to obtain an interconnection from the Participating TO. \nAny waiver of this Agreement shall, if requested, be provided in writing. \nAny waivers at any time by any Party of its rights with respect to any default under this Agreement, \nor with respect to any other matter arising in connection with this Agreement, shall not constitute \nor be deemed a waiver with respect to any subsequent default or other matter arising in connection \nwith this Agreement. Any delay, short of the statutory period of limitations, in asserting or \nenforcing any right under this Agreement shall not constitute or be deemed a waiver of such right. \n6.9 \nHeadings. The descriptive headings of the various Articles and Sections of this \nAgreement have been inserted for convenience of reference only and are of no significance in the \ninterpretation or construction of this Agreement. \n6.10 \nMultiple Counterparts. This Agreement may be executed in two (2) or more \ncounterparts, each of which is deemed an original but all constitute one and the same instrument. \n6.11 \nAmendment. The Parties may by mutual agreement amend this Agreement by a \nwritten instrument duly executed by both of the Parties."},{"page":224,"startToken":81269,"endToken":81808,"text":"5 \n \n6.12 \nModification by the Parties. The Parties may by mutual agreement amend the \nAppendices to this Agreement by a written instrument duly executed by both of the Parties. Such \namendment shall become effective and a part of this Agreement upon satisfaction of all applicable \nlaws and regulations. \n6.13 \nReservation of Rights. DCRT shall have the right to make a unilateral filing with \nFERC to modify this Agreement with respect to any rates, terms and conditions, charges, \nclassifications of service, rule or regulation under section 205 or any other applicable provision of \nthe Federal Power Act and FERC’s rules and regulations thereunder, and Large Load \nInterconnection Customer shall have the right to make a unilateral filing with FERC to modify this \nAgreement pursuant to section 206 or any other applicable provision of the Federal Power Act and \nFERC’s rules and regulations thereunder; provided that each Party shall have the right to protest \nany such filing by another Party and to participate fully in any proceeding before FERC in which \nsuch modifications may be considered. Nothing in this Agreement shall limit the rights of the \nParties or of FERC under sections 205 or 206 of the Federal Power Act and FERC’s rules and \nregulations thereunder, except to the extent that the Parties otherwise mutually agree as provided \nherein. \n6.14 \nNo Partnership. This Agreement shall not be interpreted or construed to create an \nassociation, joint venture, agency relationship, or partnership between the Parties or to impose any \npartnership obligation or partnership liability upon any Party. No Party shall have any right, power \nor authority to enter into any agreement or undertaking for, or act on behalf of, or to act as or be \nan agent or representative of, or to otherwise bind, another Party. \n6.15 \nAssignment. This Agreement may be assigned by a Party only with the written \nconsent of the other Party; provided that a Party may assign this Agreement without the consent \nof the other Party to any Affiliate of the assigning Party with an equal or greater credit rating and \nwith the legal authority and operational ability to satisfy the obligations of the assigning Party \nunder this Agreement; and provided further that the Large Load Interconnection Customer shall \nhave the right to assign this Agreement, without the consent of the other Party, for collateral \nsecurity purposes to aid in providing financing for the Large Load Facility, provided that the Large \nLoad Interconnection Customer will require any secured party, trustee or mortgagee to notify the \nother Party of any such assignment. Any financing arrangement entered into by the Large Load \nInterconnection Customer pursuant to this Section will provide that prior to or upon the exercise \nof the secured party’s, trustee’s or mortgagee’s assignment rights pursuant to said arrangement, \nthe secured creditor, the trustee or mortgagee will notify the other Party of the date and particulars \nof any such exercise of assignment right(s). Any attempted assignment that violates this Section is \nvoid and ineffective. Any assignment under this Agreement shall not relieve a Party of its \nobligations, nor shall a Party’s obligations be enlarged, in whole or in part, by reason thereof. \nWhere required, consent to assignment will not be unreasonably withheld, conditioned or delayed."},{"page":225,"startToken":81808,"endToken":81852,"text":"6 \n \nIN WITNESS WHEREOF, the Parties have caused this Agreement to be duly executed by their \nduly authorized officers or agents on the day and year first above written. \nDCR Transmission, L.L.C. \nBy: \n \n \nTitle:  \n \nDate:  \n \nLarge Load Interconnection Customer \nBy: \n \n \nTitle:  \n \nDate:"},{"page":226,"startToken":81852,"endToken":81872,"text":"Appendix IV \nAttachment 3  \nLarge Load Interconnection Agreement \nfor Interconnection Requests Processed under the Large Load Interconnection Process and \nTimeline"},{"page":227,"startToken":81872,"endToken":82100,"text":"i \nTABLE OF CONTENTS \n \nPage \nARTICLE 1. DEFINITIONS ........................................................................................................2 \nARTICLE 2. EFFECTIVE DATE, TERM AND TERMINATION .........................................8 \n2.1 \nEffective Date ......................................................................................................................8 \n2.2 \nTerm of Agreement ..............................................................................................................8 \n2.3 \nTermination Procedures .......................................................................................................8 \n2.3.1 \nWritten Notice ....................................................................................................8 \n2.3.2 \nDefault................................................................................................................8 \n2.3.3 \nSuspension of Work ...........................................................................................8 \n2.4 \nTermination Costs ................................................................................................................8 \n2.5 \nDisconnection ....................................................................................................................10 \n2.6 \nSurvival ..............................................................................................................................10 \nARTICLE 3. REGULATORY FILINGS AND CAISO TARIFF COMPLIANCE ..............10 \n3.1 \nFiling ..................................................................................................................................10 \n3.2 \nAgreement Subject to CAISO Tariff .................................................................................10 \nARTICLE 4. SCOPE OF SERVICE ..........................................................................................10 \n4.1 \nLarge Load Interconnection Service ..................................................................................10 \n4.2 \nProvision of Service ...........................................................................................................11 \n4.3 \nPerformance Standards ......................................................................................................11 \n4.4 \nNo Transmission Service ...................................................................................................11 \nARTICLE 5. LARGE LOAD INTERCONNECT CUSTOMER’S INTERCONNECTION \nFACILITIES ENGINEERING, PROCUREMENT, AND CONSTRUCTION ....................11 \n5.1 \nDesign Requirements. ........................................................................................................11 \n5.1.1 \nStandard Option ...............................................................................................11 \n5.2 \nLiquidated Damages ..........................................................................................................12 \n5.3 \nReserved .............................................................................................................................12 \n5.4 \nEquipment Procurement.....................................................................................................13 \n5.5 \nConstruction Commencement ............................................................................................13 \n5.6 \nWork Progress ....................................................................................................................13 \n5.7 \nInformation Exchange ........................................................................................................13 \n5.8 \nLimited Operation ..............................................................................................................14 \n5.9 \nLarge Load Interconnection Customer’s Interconnection Facilities ..................................14 \n5.9.1 \nLarge Load Facility and Large Load Interconnection Customer’s \nInterconnection Facilities Specifications .........................................................14 \n5.9.2 \nParticipating TO’s Review ...............................................................................14 \n5.9.3 \nLarge Load Interconnection Customer’s Interconnection Facilities \nConstruction .....................................................................................................15 \n5.10 \nParticipating TO’s Interconnection Facilities Construction ..............................................15 \n5.11 \nAccess Rights .....................................................................................................................15"},{"page":228,"startToken":82100,"endToken":82400,"text":"ii \n5.12 \nLands of Other Property Owners .......................................................................................16 \n5.13 \nPermits ...............................................................................................................................16 \n5.14 \nSuspension .........................................................................................................................16 \n5.15 \nTaxes ..................................................................................................................................16 \n5.15.1 \nLarge Load Interconnection Customer Payments Not Taxable .......................16 \n5.15.2 \nRepresentations And Covenants ......................................................................17 \n5.15.3 \nIndemnification for the Cost Consequence of Current Tax Liability Imposed \nUpon the Participating TO ...............................................................................17 \n5.15.4 \nTax Gross-Up Amount .....................................................................................18 \n5.15.5 \nPrivate Letter Ruling or Change or Clarification of Law ................................18 \n5.15.6 \nSubsequent Taxable Events .............................................................................19 \n5.15.7 \nContests ............................................................................................................19 \n5.15.8 \nRefund ..............................................................................................................20 \n5.15.9 \nTaxes Other Than Income Taxes .....................................................................21 \n5.16 \nTax Status...........................................................................................................................22 \nARTICLE 6. LARGE LOAD INTERCONNECTION TESTING AND INSPECTION ......22 \n6.1 \nPre-Commercial Operation Date Testing and Modifications ............................................22 \n6.2 \nPost-Commercial Operation Date Testing and Modifications ...........................................22 \n6.3 \nRight to Observe Testing ...................................................................................................22 \n6.4 \nRight to Inspect ..................................................................................................................22 \nARTICLE 7. METERING ..........................................................................................................23 \n7.1 \nGeneral ...............................................................................................................................23 \n7.2 \nCheck Meters .....................................................................................................................23 \n7.3 \nParticipating TO Retail Metering.......................................................................................23 \nARTICLE 8. COMMUNICATIONS .........................................................................................23 \n8.1 \nLarge Load Interconnection Customer Obligations ...........................................................23 \n8.2 \nRemote Terminal Unit .......................................................................................................24 \n8.3 \nNo Annexation ...................................................................................................................24 \nARTICLE 9. LARGE LOAD INTERCONNECTION CUSTOMER OPERATIONS .........24 \n9.1 \nGeneral ...............................................................................................................................24 \n9.2 \nParticipating TO Obligations .............................................................................................24 \n9.3 \nLarge Load Interconnection Customer Obligations ...........................................................24 \n9.4 \nReactive Power and Primary Frequency Response ...........................................................25 \n9.5 \nDisconnection from the Grid .............................................................................................25 \n9.6 \nOutages and Interruptions ..................................................................................................25 \n9.6.1 \nOutages ............................................................................................................25 \n9.6.1.1 \nOutage Authority and Coordination.....................................................25 \n9.6.1.2 \nOutage Schedules .................................................................................25 \n9.6.1.3 \nOutage Restoration...............................................................................25 \n9.6.2 \nInterruption of Service .....................................................................................26 \n9.6.3 \nUnder-Frequency and Over-Frequency Conditions .........................................26 \n9.6.4 \nSystem Protection and Other Control Requirements .......................................27 \n9.6.4.1 \nSystem Protection Facilities .................................................................27"},{"page":229,"startToken":82400,"endToken":82675,"text":"iii \n9.6.5 \nRequirements for Protection ............................................................................28 \n9.6.6 \nPower Quality ..................................................................................................28 \n9.7 \nSwitching and Tagging Rules ............................................................................................28 \n9.8 \nUse of Interconnection Facilities by Third Parties ............................................................29 \n9.8.1 \nPurpose of Interconnection Facilities...............................................................29 \n9.8.2 \nThird Party Users .............................................................................................29 \n9.9 \nDisturbance Analysis Data Exchange ................................................................................29 \nARTICLE 10. MAINTENANCE ................................................................................................29 \n10.1 \nParticipating TO Obligations .............................................................................................29 \n10.2 \nLarge Load Interconnection Customer Obligations ...........................................................29 \n10.3 \nCoordination ......................................................................................................................30 \n10.4 \nSecondary Systems ............................................................................................................30 \n10.5 \nOperating and Maintenance Expenses ...............................................................................30 \nARTICLE 11. PERFORMANCE OBLIGATION ...................................................................30 \n11.1 \nLarge Load Interconnection Customer’s Interconnection Facilities ..................................30 \n11.2 \nParticipating TO’s Interconnection Facilities ....................................................................30 \n11.3 \nNetwork Upgrades and Distribution Upgrades ..................................................................30 \n11.3.1 \nReimbursement for Network Upgrades. ..........................................................31 \n11.3.2 \nRepayment of Amounts Advanced for Network Upgrades .............................31 \n11.3.2.1 \nRepayment Schedule ............................................................................31 \n11.3.2.2 \nInterest Payments and Assignment Rights ...........................................31 \n11.3.2.3 \nFailure to Achieve Commercial Operation ..........................................32 \n11.3.2.4 \nAccelerated Reimbursement Against Reimbursement Security ..........32 \n11.3.3 \nSpecial Provisions for Affected Systems .........................................................33 \n11.4 \nProvision of Interconnection Financial Security. ...............................................................34 \nARTICLE 12. INVOICE .............................................................................................................34 \n12.1 \nGeneral ...............................................................................................................................34 \n12.2 \nFinal Invoice ......................................................................................................................34 \n12.3 \nPayment..............................................................................................................................35 \n12.4 \nDisputes..............................................................................................................................35 \nARTICLE 13. EMERGENCIES ................................................................................................36 \n13.1 \n[Reserved] ..........................................................................................................................36 \n13.2 \nObligations .........................................................................................................................36 \n13.3 \nNotice .................................................................................................................................36 \n13.4 \nImmediate Action...............................................................................................................36 \n13.5 \nParticipating TO Authority ................................................................................................36 \n13.5.1 \nGeneral .............................................................................................................36 \n13.5.2 \nReduction and Disconnection ..........................................................................37 \n13.6 \nLarge Load Interconnection Customer Authority ..............................................................37 \n13.7 \nLimited Liability ................................................................................................................37 \nARTICLE 14. REGULATORY REQUIREMENTS AND GOVERNING LAWS ...............37 \n14.1 \nRegulatory Requirements...................................................................................................37"},{"page":230,"startToken":82675,"endToken":82899,"text":"iv \n14.2 \nGoverning Law ..................................................................................................................38 \nARTICLE 15. NOTICES ............................................................................................................38 \n15.1 \nGeneral ...............................................................................................................................38 \n15.2 \nBillings and Payments........................................................................................................38 \n15.3 \nAlternative Forms of Notice ..............................................................................................38 \n15.4 \nOperations and Maintenance Notice ..................................................................................38 \nARTICLE 16. FORCE MAJEURE............................................................................................39 \n16.1 \nForce Majeure ....................................................................................................................39 \nARTICLE 17. DEFAULT ...........................................................................................................39 \n17.1 \nDefault................................................................................................................................39 \n17.1.1 \nGeneral .............................................................................................................39 \n17.1.2 \nRight to Terminate ...........................................................................................39 \nARTICLE 18. INDEMNITY, CONSEQUENTIAL DAMAGES, AND INSURANCE ........40 \n18.1 \nIndemnity ...........................................................................................................................40 \n18.1.1 \nIndemnified Party.............................................................................................40 \n18.1.2 \nIndemnifying Party ..........................................................................................40 \n18.1.3 \nIndemnity Procedures ......................................................................................40 \n18.2 \nConsequential Damages .....................................................................................................41 \n18.3 \nInsurance ............................................................................................................................41 \n18.3.1 \nWorkers’ Compensation Insurance and Employers’ Liability .........................41 \n18.3.2 \nCommercial General Liability Insurance .........................................................41 \n18.3.3 \nBusiness Automobile Liability Insurance ........................................................42 \n18.3.4 \nExcess Liability Insurance ...............................................................................42 \n18.3.8 \n[Not Used.] .......................................................................................................43 \nARTICLE 19. ASSIGNMENT ...................................................................................................44 \n19.1 \nAssignment ........................................................................................................................44 \nARTICLE 20. SEVERABILITY ................................................................................................44 \n20.1 \nSeverability ........................................................................................................................44 \nARTICLE 21. COMPARABILITY ...........................................................................................44 \n21.1 \nComparability ....................................................................................................................44 \nARTICLE 22. CONFIDENTIALITY ........................................................................................45 \n22.1 \nConfidentiality ...................................................................................................................45 \n22.1.1 \nTerm .................................................................................................................45 \n22.1.2 \nScope ................................................................................................................45 \n22.1.3 \nRelease of Confidential Information ................................................................45 \n22.1.4 \nRights ...............................................................................................................46 \n22.1.5 \nNo Warranties ..................................................................................................46 \n22.1.6 \nStandard of Care ..............................................................................................46 \n22.1.7 \nOrder of Disclosure ..........................................................................................46 \n22.1.8 \nTermination of Agreement ...............................................................................46"},{"page":231,"startToken":82899,"endToken":83132,"text":"v \n22.1.9 \nRemedies ..........................................................................................................46 \n22.1.10 \nDisclosure to FERC, its Staff, or a State ..........................................................47 \nARTICLE 23. ENVIRONMENTAL RELEASES ....................................................................48 \nARTICLE 24. INFORMATION REQUIREMENTS ...............................................................48 \n24.1 \nInformation Acquisition .....................................................................................................48 \n24.2 \nInformation Submission by Participating TO ....................................................................48 \nARTICLE 25. INFORMATION ACCESS AND AUDIT RIGHTS ........................................48 \n25.1 \nInformation Access ............................................................................................................48 \n25.2 \nReporting of Non-Force Majeure Events ...........................................................................49 \n25.3 \nAudit Rights .......................................................................................................................49 \n25.4 \nAudit Rights Periods ..........................................................................................................49 \n25.4.1 \nAudit Rights Period for Construction-Related Accounts and Records ............49 \n25.4.2 \nAudit Rights Period for All Other Accounts and Records ...............................49 \n25.5 \nAudit Results ......................................................................................................................50 \nARTICLE 26. SUBCONTRACTORS .......................................................................................50 \n26.1 \nGeneral ...............................................................................................................................50 \n26.2 \nResponsibility of Principal .................................................................................................50 \n26.3 \nNo Limitation by Insurance ...............................................................................................50 \nARTICLE 27. DISPUTES ...........................................................................................................50 \n27.1 \nSubmission .........................................................................................................................50 \n27.2 \nExternal Arbitration Procedures ........................................................................................51 \n27.3 \nArbitration Decisions .........................................................................................................51 \n27.4 \nCosts ...................................................................................................................................51 \nARTICLE 28. REPRESENTATIONS, WARRANTIES AND COVENANTS ......................51 \n28.1 \nGeneral ...............................................................................................................................51 \n28.1.1 \nGood Standing .................................................................................................51 \n28.1.2 \nAuthority ..........................................................................................................52 \n28.1.3 \nNo Conflict.......................................................................................................52 \n28.1.4 \nConsent and Approval......................................................................................52 \nARTICLE 29. [RESERVED] ......................................................................................................52 \nARTICLE 30. MISCELLANEOUS ...........................................................................................52 \n30.1 \nBinding Effect ....................................................................................................................52 \n30.2 \nConflicts .............................................................................................................................52 \n30.3 \nRules of Interpretation .......................................................................................................52 \n30.4 \nEntire Agreement ...............................................................................................................53 \n30.5 \nNo Third-Party Beneficiaries .............................................................................................53 \n30.6 \nWaiver ................................................................................................................................53 \n30.7 \nHeadings ............................................................................................................................53 \n30.8 \nMultiple Counterparts ........................................................................................................53 \n30.9 \nAmendment ........................................................................................................................53"},{"page":232,"startToken":83132,"endToken":83217,"text":"vi \n30.10 Modification by the Parties ................................................................................................53 \n30.11 Reservation of Rights .........................................................................................................54 \n30.12 No Partnership ...................................................................................................................54 \n30.13 Joint and Several Obligations ............................................................................................54 \n \nAppendices \nAppendix A Interconnection Facilities, Network Upgrades and Distribution Upgrades \nAppendix B Milestones \nAppendix C Interconnection Details \nAppendix D Security Arrangements Details \nAppendix E Commercial Operation Date \nAppendix F Addresses for Delivery of Notices and Billings \nAppendix G Large Load Interconnection Customer’s Share of Costs of Network Upgrades \nfor Applicable Project Group \nAppendix H Co-Location and Behind-the-Meter Generation Provisions"},{"page":233,"startToken":83217,"endToken":83526,"text":"1 \nAttachment 3  \nto the DCRT Large Load Interconnection Process and Timeline  \nDCRT TO Tariff, Appendix IV \nLARGE LOAD INTERCONNECTION AGREEMENT \n[LARGE LOAD INTERCONNECTION CUSTOMER] \nAND \nDCR TRANSMISSION, L.L.C. \nTHIS LARGE LOAD INTERCONNECTION AGREEMENT (“LLIA”) is made and \nentered into this ______ day of ________________ 20___, by and among _________________, \na ________________, organized and existing under the laws of the State/Commonwealth of \n___________ (“Large Load Interconnection Customer” with a Large Load Facility), and DCR \nTransmission, L.L.C., a limited liability company, organized and existing under the laws of the \nState of Delaware (“DCRT” or “Participating TO”). Large Load Interconnection Customer, and \nParticipating TO each may be referred to as a “Party” or collectively as the “Parties.”1 \nRECITALS \nWHEREAS, the California Independent System Operator Corporation (“CAISO”) \nexercises Operational Control over the CAISO Controlled Grid; and \nWHEREAS, the Participating TO owns, operates, and maintains the Participating TO’s \nTransmission System; and \nWHEREAS, Large Load Interconnection Customer intends to own, lease and/or control \nand operate the Large Load Facility identified as a Large Load Facility in Appendices A and C to \nthis LLIA; and \nWHEREAS, Large Load Interconnection Customer, Participating TO, and, as applicable, \nCAISO have agreed to enter into this LLIA for the purpose of interconnecting the Large Load \nFacility with the Participating TO’s Transmission System; and  \nWHEREAS, to the extent applicable, Appendix H sets forth the applicable provisions \nrelating to impacts (financial, operational, regulatory and otherwise) on the Large Load \nInterconnection Customer arising out of or related to co-located or Behind-the-Meter Generation \nutilizing the Large Load Interconnection Customer’s Interconnection Facilities that may \nnecessitate CAISO becoming a signatory to this LLIA;   \nNOW, THEREFORE, in consideration of and subject to the mutual covenants contained \nherein, it is agreed: \n \n1 The California Independent System Operator Corporation will be added as a party to this LLIA as may be required \npursuant to Appendix H."},{"page":234,"startToken":83526,"endToken":83897,"text":"2 \nWhen used in this LLIA, terms with initial capitalization that are not defined in Article 1 \nshall have the meanings specified in the Article in which they are used.  Further, terms with \ninitial capitalization which are used but not defined in the LLIA shall have the meaning given \nthem in the Appendices. \nArticle 1. Definitions \n1.1 \nCapitalized terms used herein that are not defined in this Article 1 are defined in the \nParticipating TO Tariff.  \nAccess Party shall have the meaning set forth in Article 5.11. \nAffected System shall mean an electric system other than the Participating Transmission \nOwners Transmission System that may be affected by the proposed interconnection. \nAffiliate shall mean, with respect to a corporation, partnership or other entity, each such \nother corporation, partnership or other entity that directly or indirectly, through one or more \nintermediaries, controls, is controlled by, or is under common control with, such corporation, \npartnership or other entity. \nAlternative Transmission Technologies shall mean any transmission technology other \nthan Network Upgrades that can be used to improve the Participating TO’s Transmission System \nto interconnect an Interconnection Customer or Large Load Interconnection Customer, which \nmay include static synchronous compensators, static VAR compensators, advanced power flow \ncontrol devices, transmission switching, synchronous condensers, voltage source converters, \nadvanced conductors, and tower lifting.  \nApplicable Laws and Regulations shall mean all duly promulgated applicable federal, \nstate and local laws, regulations, rules, ordinances, codes, decrees, judgments, directives, or \njudicial or administrative orders, permits and other duly authorized actions of any Governmental \nAuthority. \nApplicable Reliability Council shall mean the Western Electricity Coordinating Council \nor its successor. \nApplicable Reliability Standards shall mean the requirements and guidelines of NERC, \nthe Applicable Reliability Council, and the Balancing Authority Area of the Participating TO’s \nTransmission System to which the Large Load Facility is directly connected, including \nrequirements adopted pursuant to section 215 of the Federal Power Act. \nBalancing Authority shall mean the responsible entity that integrates resource plans \nahead of time, maintains load-interchange-generation balance within a Balancing Authority \nArea, and supports Interconnection frequency in real time. \nBalancing Authority Area shall mean the collection of generation, transmission, and \nloads within the metered boundaries of the Balancing Authority. The Balancing Authority \nmaintains load-resource balance within this area."},{"page":235,"startToken":83897,"endToken":84328,"text":"3 \nBehind-the-Meter Generation shall mean generating facility that delivers energy to load \nwithout using the transmission system or any distribution facilities. \nBreach shall mean the failure of a Party to perform or observe any material term or \ncondition of this LLIA. \nBreaching Party shall mean a Party that is in Breach of this LLIA. \nBusiness Day shall mean Monday through Friday, excluding federal holidays and the day \nafter Thanksgiving Day. \nCAISO Controlled Grid shall mean the system of transmission lines and associated \nfacilities of the parties to the Transmission Control Agreement that have been placed under the \nCAISO’s Operational Control. \nCAISO Tariff shall mean the CAISO’s tariff, as filed with FERC, and as amended or \nsupplemented from time to time, or any successor tariff. \nCalendar Day shall mean any day including Saturday, Sunday or a federal holiday. \nCo-located Facilities shall mean both the load and generation facilities in a configuration \nwhere end-use customer load is physically connected to the facilities of an existing or planned \ngenerating facility on the generator interconnection customer’s side of the point of \ninterconnection to the Participating TO’s Transmission System.  \nCommercial Operation shall mean the status of a (i) Large Load Facility or project \nphase at a Large Load Facility that has commenced demand for electricity, excluding electricity \nused during the construction of the Large Load Facility or (ii) Network Upgrade, when such \nupgrade is fully and finally constructed and can fully operate as intended. \nCommercial Operation Date of a Large Load Facility or project phase shall mean the \ndate on which the Large Load Facility or project phase at the Large Load Facility commences \nCommercial Operation as agreed to by the applicable Participating TO, as applicable, the \nCAISO, and the Large Load Interconnection Customer pursuant to Appendices E and H to this \nLLIA, and in accordance with any implementation plan agreed to by the Participating TO and the \nCAISO for multiple individual Large Load Facilities or project phases at a Large Load Facility \nwhere a Large Load Interconnection Customer intends to establish separate Commercial \nOperation Dates for those Large Load Facilities or project phases. \nConfidential Information shall mean any confidential, proprietary or trade secret \ninformation of a plan, specification, pattern, procedure, design, device, list, concept, policy or \ncompilation relating to the present or planned business of a Party, which is designated as \nconfidential by the Party supplying the information, whether conveyed orally, electronically, in \nwriting, through inspection, or otherwise, subject to Article 22.1.2. \nDefault shall mean the failure of a Breaching Party to cure its Breach in accordance with \nArticle 17 of this LLIA."},{"page":236,"startToken":84328,"endToken":84792,"text":"4 \nDistribution System shall mean those non-CAISO-controlled transmission and \ndistribution facilities owned by the Participating TO. \nDistribution Upgrades shall mean the additions, modifications, and upgrades to the \nParticipating TO’s Distribution System. Distribution Upgrades do not include Interconnection \nFacilities. \nEffective Date shall mean the date on which this LLIA becomes effective upon \nexecution by all Parties subject to acceptance by FERC, or if filed unexecuted, upon the date \nspecified by FERC. \nEmergency Condition shall mean a condition or situation, that in the judgment of the \nParty making the claim, is imminently likely: (1) to endanger life or property; (2) is imminently \nlikely to cause a material adverse effect on the security of, or damage to, the Participating TO’s \nTransmission System, Participating TO’s Interconnection Facilities, Distribution System, or the \nelectric systems of others to which the Participating TO’s electric system is directly connected; \nor (3) to cause a material adverse effect on the security of, or damage to, the Large Load Facility \nor Large Load Interconnection Customer’s Interconnection Facilities.   \nEnvironmental Law shall mean Applicable Laws and Regulations relating to pollution \nor protection of the environment or natural resources. \nFederal Power Act shall mean the Federal Power Act, as amended, 16 U.S.C. §§ 791a et \nseq. \nFERC shall mean the Federal Energy Regulatory Commission or its successor. \nFlexible Interim Load Interconnection Service (FILI) shall mean the interim \ninterconnection service that the Participating TO may offer pursuant to Section 4.1 of the LLIP \nwhere the Large Load Facility cannot be reliably served at its full requested demand until certain \nNetwork Upgrades are completed, as further described in Section A-2 of Appendix A to this \nLLIA. \nForce Majeure shall mean any act of God, labor disturbance, act of the public enemy, \nwar, insurrection, riot, fire, storm or flood, explosion, breakage or accident to machinery or \nequipment, any order, regulation or restriction imposed by governmental, military or lawfully \nestablished civilian authorities, or any other cause beyond a Party’s control. A Force Majeure \nevent does not include acts of negligence or intentional wrongdoing by the Party claiming Force \nMajeure. \nGood Utility Practice shall mean any of the practices, methods and acts engaged in or \napproved by a significant portion of the electric utility industry during the relevant time period, \nor any of the practices, methods and acts which, in the exercise of reasonable judgment in light \nof the facts known at the time the decision was made, could have been expected to accomplish \nthe desired result at a reasonable cost consistent with good business practices, reliability, safety \nand expedition. Good Utility Practice is not intended to be any one of a number of the optimum \npractices, methods, or acts to the exclusion of all others, but rather to be acceptable practices, \nmethods, or acts generally accepted in the region."},{"page":237,"startToken":84792,"endToken":85207,"text":"5 \nGovernmental Authority shall mean any federal, state, local or other governmental, \nregulatory or administrative agency, court, commission, department, board, or other \ngovernmental subdivision, legislature, rulemaking board, tribunal, or other governmental \nauthority having jurisdiction over the Parties, their respective facilities, or the respective services \nthey provide, and exercising or entitled to exercise any administrative, executive, police, or \ntaxing authority or power; provided, however, that such term does not include the Large Load \nInterconnection Customer, CAISO, Participating TO, or any Affiliate thereof. \nGranting Party shall have the meaning set forth in Article 5.11. \nHazardous Substances shall mean any chemicals, materials or substances defined as or \nincluded in the definition of “hazardous substances,” “hazardous wastes,” “hazardous materials,” \n“hazardous constituents,” “restricted hazardous materials,” “extremely hazardous substances,” \n“toxic substances,” “radioactive substances,” “contaminants,” “pollutants,” “toxic pollutants” or \nwords of similar meaning and regulatory effect under any applicable Environmental Law, or any \nother chemical, material or substance, exposure to which is prohibited, limited or regulated by \nany applicable Environmental Law. \nIn-Service Date shall mean the date upon which the Large Load Interconnection \nCustomer reasonably expects it will be ready to begin use of the Participating TO’s \nInterconnection Facilities to draw energy from the Participating Transmission Owner \nTransmission System. \nInterconnection Facilities shall mean the Participating TO’s Interconnection Facilities \nand the Large Load Interconnection Customer’s Interconnection Facilities. Collectively, \nInterconnection Facilities include all facilities and equipment between the Large Load Facility \nand the Point of Interconnection, including any modification, additions or upgrades that are \nnecessary to physically and electrically interconnect the Large Load Facility to the Participating \nTO’s Transmission System. Interconnection Facilities are sole use facilities and shall not include \nDistribution Upgrades, or Network Upgrades. \nInterconnection Financial Security (IFS) shall mean any of the financial instruments \nlisted in Attachment 4 to the LLIP that are posted by Large Load Interconnection Customer to \nfinance the construction of facilities or Network Upgrades. \nInterconnection Service shall mean the service provided by the Participating TO and, as \napplicable, CAISO associated with interconnecting the Large Load Interconnection Customer’s \nInterconnection Facilities to the Participating TO’s Transmission System and enabling the \nCAISO Controlled Grid to transmit electric energy and capacity from the  CAISO Controlled \nGrid to the Large Load Facility at the Point of Interconnection, pursuant to the terms of this \nLLIA, the Participating TO’s Transmission Owner Tariff, and, as applicable, the CAISO Tariff. \nIRS shall mean the Internal Revenue Service. \nLLIP means the process for studying load interconnection as set forth in Appendix IV of \nthe Participating TO Tariff."},{"page":238,"startToken":85207,"endToken":85620,"text":"6 \nLarge Load Facility means a facility whose Point(s) of Interconnection connect to the \nParticipating TO’s Transmission System and has a peak load of 50 megawatts (MW) or greater. \nLarge Load Facility Point of Change of Ownership shall mean the point, as set forth in \nAppendix A to this LLIA, where the Large Load Interconnection Customer’s Interconnection \nFacilities connect to the Participating TO’s Interconnection Facilities. \nLarge Load Interconnection Agreement (LLIA) shall have the meaning set forth in the \nPreamble. \nLarge Load Interconnection Application shall mean an application for interconnection, \nin the form of Section 1.4 to the LLIP. \nLarge Load Interconnection Customer shall have the meaning set forth in the \nPreamble. \nLarge Load Interconnection Customer’s Interconnection Facilities shall mean all \nfacilities and equipment, as identified in Appendix A of this LLIA, that are located between the \nLarge Load Facility and the Participating TO’s Interconnection Facilities, including any \nmodification, addition, or upgrades to such facilities and equipment necessary to physically and \nelectrically interconnect the Large Load Facility to the Participating TO’s Transmission System. \nLarge Load Interconnection Customer’s Interconnection Facilities are sole use facilities. \nLarge Load Interconnection Studies shall mean studies performed pursuant to \nAppendix IV of the Participating TO Tariff, including the Large Load System Impact Study and \nthe Large Load Facilities Study. \nLoss shall mean any and all damages, losses, and claims, including claims and actions \nrelating to injury to or death of any person or damage to property, demand, suits, recoveries, \ncosts and expenses, court costs, attorney fees, and all other obligations by or to third parties. \nMetering Equipment shall mean all metering equipment installed or to be installed for \nmeasuring the power flows to the Large Load Facility pursuant to this LLIA at the metering \npoints, including but not limited to instrument transformers, Megawatt-hour-meters, data \nacquisition equipment, transducers, remote terminal unit, communications equipment, phone \nlines, and fiber optics.   \nNERC shall mean the North American Electric Reliability Corporation or its successor \norganization. \nNetwork Upgrades shall be the mean the additions, modifications, and upgrades to the \nParticipating TO’s Transmission System at or beyond the Point of Interconnection, identified in \nthe Large Load Interconnection Studies, as identified in Appendix A and, as applicable \nAppendix H, to relieve constraints on the Participating TO’s Transmission System.  Alternative \nTransmission Technologies shall be included in the definition of Network Upgrades. \nOperational Control shall mean the rights of the CAISO under the Transmission \nControl Agreement and the CAISO Tariff to direct the parties to the Transmission Control"},{"page":239,"startToken":85620,"endToken":86065,"text":"7 \nAgreement how to operate their transmission lines and facilities and other electric plant affecting \nthe reliability of those lines and facilities for the purpose of affording comparable non-\ndiscriminatory transmission access and meeting applicable reliability criteria. \nParticipating TO’s Interconnection Facilities shall mean all facilities and equipment \nowned, controlled or operated by the Participating TO from the Large Load Facility Point of \nChange of Ownership to the Point of Interconnection as identified in Appendix A to this LLIA, \nincluding any modifications, additions or upgrades to such facilities and equipment. Participating \nTO’s Interconnection Facilities are sole use facilities and shall not include Distribution \nUpgrades, or Network Upgrades. \nParticipating TO’s Interconnection Handbook shall mean the Participating TO’s \nbusiness practice for prospective Large Load Interconnection Customers seeking interconnection \nunder the Large Load Interconnection Process described in Appendix IV to the Participating \nTO’s Tariff. \nParticipating TO’s Tariff shall mean the currently effective tariff of DCR Transmission, \nL.L.C., Transmission Owner Tariff on file with FERC, as may be amended or superseded from \ntime to time upon further filing with and acceptance by FERC.  \nParticipating TO’s Transmission System shall mean the facilities owned and operated \nby the Participating TO and that have been placed under the CAISO’s Operational Control, \nwhich facilities form part of the CAISO Controlled Grid. \nParty or Parties shall mean the Participating TO, CAISO, Large Load Interconnection \nCustomer or the applicable combination of the above. \nPoint of Interconnection shall mean the point, as set forth in Appendix A to this LLIA, \nwhere the Interconnection Facilities connect to the Participating TO’s Transmission System. \nReasonable Efforts shall mean, with respect to an action required to be attempted or \ntaken by a Party under this LLIA, efforts that are timely and consistent with Good Utility \nPractice and are otherwise substantially equivalent to those a Party would use to protect its own \ninterests. \nScoping Meeting shall mean the meeting among representatives of the  Large Load \nInterconnection Customer, the Participating TO(s), and, as applicable the CAISO and other \nAffected Systems, conducted for the purpose of discussing alternative interconnection options, to \nexchange information including any transmission data and earlier study evaluations that would \nbe reasonably expected to impact such interconnection options, to analyze such information, and \nto determine the potential feasible Points of Interconnection. \nSystem Protection Facilities shall mean the equipment, including necessary protection \nsignal communications equipment, that protects: (1) the Participating TO’s Transmission \nSystem, Participating TO’s Interconnection Facilities, CAISO Controlled Grid, and Affected \nSystems from faults or other electrical disturbances occurring at the Large Load Interconnection \nCustomer’s Interconnection Facilities; and (2) the Large Load Facility from faults or other \nelectrical system disturbances occurring on the CAISO Controlled Grid, Participating TO’s"},{"page":240,"startToken":86065,"endToken":86510,"text":"8 \nInterconnection Facilities, and Affected Systems or on other delivery systems or other generating \nsystems to which the CAISO Controlled Grid is directly connected.  \nTransmission Control Agreement shall mean CAISO FERC Electric Tariff No. 7. \nTrial Operation shall mean the period during which the Large Load Interconnection \nCustomer is engaged in on-site test operations and commissioning of the Large Load Facility \nprior to Commercial Operation. \nArticle 2. Effective Date, Term and Termination \n2.1 \nEffective Date. This LLIA shall become effective upon execution by all Parties subject \nto acceptance by FERC (if applicable), or if filed unexecuted, upon the date specified by \nFERC. The Participating TO shall promptly file this LLIA with FERC upon execution in \naccordance with Article 3.1, if required. \n2.2 \nTerm of Agreement. Subject to the provisions of Article 2.3, this LLIA shall remain in \neffect for a period of ten (10) years from the Effective Date (Term Specified in individual \nagreements to be ten (10) years or such other longer period as the Large Load \nInterconnection Customer may request) and shall be automatically renewed for each \nsuccessive one-year period thereafter. \n2.3 \nTermination Procedures. \n2.3.1 Written Notice. This LLIA may be terminated by the Large Load Interconnection \nCustomer after giving the Participating TO and, as applicable CAISO, ninety (90) \nCalendar Days advance written notice, or by the Participating TO notifying FERC \nafter the Large Load Facility permanently ceases Commercial Operation. \n2.3.2 Default. A Party may terminate this LLIA in accordance with Article 17. \n2.3.3 Suspension of Work. This LLIA may be deemed terminated in accordance with \nArticle 5.14, if applicable. \n2.3.4 Notwithstanding Articles 2.3.1, 2.3.2, and 2.3.3, no termination shall become \neffective until the Parties have complied with all Applicable Laws and Regulations \napplicable to such termination, including the filing with FERC of a notice of \ntermination of this LLIA (if applicable), which notice has been accepted for filing \nby FERC, and the Large Load Interconnection Customer has fulfilled its \ntermination cost obligations under Article 2.4. \n2.4 \nTermination Costs. Immediately upon the other Parties’ receipt of a notice of the \ntermination of this LLIA pursuant to Article 2.3 above, the Participating TO will \ndetermine the total cost responsibility of the Large Load Interconnection Customer. If, as \nof the date of the other Parties’ receipt of the notice of termination, the Large Load \nInterconnection Customer has not already paid its share of Network Upgrade costs, as set \nforth in Appendix G to this LLIA, the Participating TO will liquidate the Large Load \nInterconnection Customer’s Interconnection Financial Security associated with its cost"},{"page":241,"startToken":86510,"endToken":87023,"text":"9 \nresponsibility for Network Upgrades, in accordance with Appendix IV, Attachment 4 of \nthe Participating TO’s tariff. \nThe Large Load Interconnection Customer will also be responsible for all costs incurred \nor irrevocably committed to be incurred in association with the construction of the \nParticipating TO’s Interconnection Facilities (including any cancellation costs relating to \norders or contracts for Interconnection Facilities and equipment) and other such expenses, \nincluding any Distribution Upgrades for which the Participating TO has incurred \nexpenses or has irrevocably committed to incur expenses and has not been reimbursed by \nthe Large Load Interconnection Customer, as of the date of the other Parties’ receipt of \nthe notice of termination, subject to the limitations set forth in this Article 2.4. Nothing in \nthis Article 2.4 shall limit the Parties’ rights under Article 17. If, as of the date of the \nother Parties’ receipt of the notice of termination, the Large Load Interconnection \nCustomer has not already reimbursed the Participating TO for costs incurred to construct \nthe Participating TO’s Interconnection Facilities, the Participating TO will liquidate the \nLarge Load Interconnection Customer’s Interconnection Financial Security associated \nwith the construction of the Participating TO’s Interconnection Facilities. If the amount \nof the Interconnection Financial Security liquidated by the Participating TO under this \nArticle 2.4 is insufficient to compensate the Participating TO for actual costs associated \nwith the construction of the Participating TO’s Interconnection Facilities contemplated in \nthis Article, any additional amounts will be the responsibility of the Large Load \nInterconnection Customer. Any such additional amounts due from the Large Load \nInterconnection Customer beyond the amounts covered by its Interconnection Financial \nSecurity will be due to the Participating TO immediately upon termination of this LLIA. \nIf the amount of the Interconnection Financial Security exceeds the Interconnection \nCustomer’s cost responsibility under this LLIA, any excess amount will be released to the \nInterconnection Customer. \n2.4.1 Large Load Interconnection.  Notwithstanding the foregoing, in the event of \ntermination by a Party, all Parties shall use commercially Reasonable Efforts to \nmitigate the costs, damages, and charges arising as a consequence of termination. \nWith respect to any portion of the Participating TO’s Interconnection Facilities that \nhave not yet been constructed or installed, the Participating TO shall to the extent \npossible, and with the Large Load Interconnection Customer’s authorization, cancel \nany pending orders of, or return, any materials or equipment for, or contracts for \nconstruction of, such facilities; provided that in the event the Large Load \nInterconnection Customer elects not to authorize such cancellation, the Large Load \nInterconnection Customer shall assume all payment obligations with respect to such \nmaterials, equipment, and contracts, and the Participating TO shall deliver such \nmaterial and equipment, and, if necessary, assign such contracts, to the Large Load \nInterconnection Customer as soon as practicable, at the Large Load Interconnection \nCustomer’s expense. To the extent that the Large Load Interconnection Customer \nhas already paid the Participating TO for any or all such costs of materials or \nequipment not taken by the Large Load Interconnection Customer, the Participating \nTO shall promptly refund such amounts to the Large Load Interconnection"},{"page":242,"startToken":87023,"endToken":87483,"text":"10 \nCustomer, less any costs, including penalties, incurred by the Participating TO to \ncancel any pending orders of, or return such materials, equipment, or contracts. \n2.4.2 The Participating TO may, at its option, retain any portion of such materials, \nequipment, or facilities that the Large Load Interconnection Customer chooses not \nto accept delivery of, in which case the Participating TO shall be responsible for all \ncosts associated with procuring such materials, equipment, or facilities. \n2.4.3 With respect to any portion of the Interconnection Facilities, and any other facilities \nalready installed or constructed pursuant to the terms of this LLIA, Large Load \nInterconnection Customer shall be responsible for all costs associated with the \nremoval, relocation or other disposition or retirement of such materials, equipment, \nor facilities. \n2.5 \nDisconnection. Upon termination of this LLIA, the Parties will take all appropriate steps \nto disconnect the Large Load Facility from the Participating TO’s Transmission System. \nAll costs required to effectuate such disconnection shall be borne by the terminating \nParty, unless such termination resulted from the non-terminating Party’s Default of this \nLLIA or such non-terminating Party otherwise is responsible for these costs under this \nLLIA. \n2.6 \nSurvival. This LLIA shall continue in effect after termination to the extent necessary to \nprovide for final billings and payments and for costs incurred hereunder, including \nbillings and payments pursuant to this LLIA; to permit the determination and \nenforcement of liability and indemnification obligations arising from acts or events that \noccurred while this LLIA was in effect; and to permit each Party to have access to the \nlands of the other Parties pursuant to this LLIA or other applicable agreements, to \ndisconnect, remove or salvage its own facilities and equipment. \nArticle 3. Regulatory Filings and CAISO Tariff Compliance \n3.1 \nFiling. The Participating TO shall file this LLIA (and any amendment hereto) with the \nappropriate Governmental Authority(ies), if required. The Large Load Interconnection \nCustomer may request that any information provided be subject to the confidentiality \nprovisions of Article 22. If the Large Load Interconnection Customer has executed this \nLLIA, or any amendment thereto, the Large Load Interconnection Customer shall \nreasonably cooperate with the Participating TO and, as applicable, CAISO with respect to \nsuch filing and to provide any information reasonably requested by the Participating TO \nor CAISO as needed to comply with applicable regulatory requirements. \n3.2 \nAgreement Subject to CAISO Tariff. The Large Load Interconnection Customer will \ncomply with all applicable provisions of the CAISO Tariff, including the GIDAP as may \nbe required pursuant to Appendix H for co-located or Behind-the-Meter Generation. \nArticle 4. Scope of Service \n4.1 \nLarge Load Interconnection Service. Large Load Interconnection Service allows the \nLarge Load Interconnection Customer to connect the Large Load Facility to the"},{"page":243,"startToken":87483,"endToken":87924,"text":"11 \nParticipating TO’s Transmission System and be eligible to receive energy from the \nCAISO Controlled Grid. To the extent the Large Load Interconnection Customer wants \nto receive Large Load Interconnection Service, the Participating TO shall construct \nfacilities identified in Appendices A and C that the Participating TO is responsible to \nconstruct. \n4.2 \nProvision of Service. The Participating TO shall provide Interconnection Service for the \nLarge Load Facility. Any Interconnection Service subject to Appendix H shall be \nnegotiated between the Participating TO, Large Load Interconnection Customer and the \nCAISO.  \n4.3 \nPerformance Standards. Each Party shall perform all of its obligations under this LLIA \nin accordance with Applicable Laws and Regulations, Applicable Reliability Standards, \nand Good Utility Practice, and to the extent a Party is required or prevented or limited in \ntaking any action by such regulations and standards, such Party shall not be deemed to be \nin Breach of this LLIA for its compliance therewith. If such Party is the Participating TO, \nthen that Party shall amend the LLIA and submit the amendment to FERC for approval. \n4.4 \nNo Transmission Service. The execution of this LLIA does not constitute a request for, \nnor the provision of, any transmission service over the Participating TO’s Transmission \nSystem, and does not convey any right to deliver electricity to, or receive electricity from, \nany specific point of delivery. Large Load Interconnection Customer must request \ntransmission service from CAISO, including through a Scheduling Coordinator, in \naccordance with the CAISO Tariff.  \nArticle 5. Large Load Interconnect Customer’s Interconnection Facilities Engineering, \nProcurement, And Construction \n5.1 \nDesign Requirements.  Interconnection Facilities, Network Upgrades, and Distribution \nUpgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. \nSuch studies, design and construction shall be based on the assumed accuracy and \ncompleteness of all technical information received by the Participating TO from the \nLarge Load Interconnection Customer associated with interconnecting the Large Load \nFacility. \n5.1.1 Standard Option. The Participating TO shall design, procure, and construct the \nParticipating TO’s Interconnection Facilities, Network Upgrades using Reasonable \nEfforts to complete the Participating TO’s Interconnection Facilities and Network \nUpgrades by the dates set forth in Appendix B, Milestones. The Participating TO \nshall not be required to undertake any action which is inconsistent with its standard \nsafety practices, its material and equipment specifications, its design criteria and \nconstruction procedures, its labor agreements, and Applicable Laws and \nRegulations. In the event the Participating TO reasonably expects that it will not be \nable to complete the Participating TO’s Interconnection Facilities, Network \nUpgrades, and Distribution Upgrades by the specified dates, the Participating TO \nshall promptly provide written notice to the Large Load Interconnection Customer"},{"page":244,"startToken":87924,"endToken":88404,"text":"12 \nand, as applicable, the CAISO and the Participating TO shall undertake Reasonable \nEfforts to meet the earliest dates thereafter.    \n5.2 \nLiquidated Damages. The actual damages to the Large Load Interconnection Customer, \nin the event the Participating TO’s Interconnection Facilities or Network Upgrades are \nnot completed by the dates designated by the Large Load Interconnection Customer and \naccepted by the Participating TO, may include Large Load Interconnection Customer’s \nfixed operation and maintenance costs and lost opportunity costs. Such actual damages \nare uncertain and impossible to determine at this time. Because of such uncertainty, any \nliquidated damages paid by the Participating TO the Large Load Interconnection \nCustomer in the event that the Participating TO does not complete any portion of the \nParticipating TO’s Interconnection Facilities or Network Upgrades by the applicable \ndates, shall be an amount equal to one half of one percent (½ of 1%) per day of the actual \ncost of the Participating TO’s Interconnection Facilities and Network Upgrades, in the \naggregate, for which the Participating TO has assumed responsibility to design, procure \nand construct. \nHowever, in no event shall the total liquidated damages exceed twenty percent (20%) of \nthe actual cost of the Participating TO’s Interconnection Facilities and Network Upgrades \nfor which the Participating TO has assumed responsibility to design, procure, and \nconstruct. The foregoing payments will be made by the Participating TO the Large Load \nInterconnection Customer as just compensation for the damages caused to the Large Load \nInterconnection Customer, which actual damages are uncertain and impossible to \ndetermine at this time, and as reasonable liquidated damages, but not as a penalty or a \nmethod to secure performance of this LLIA. Liquidated damages, when the Parties agree \nto them, are the exclusive remedy for the Participating TO’s failure to meet its schedule. \nNo liquidated damages shall be paid to the Large Load Interconnection Customer if: (1) \nthe Large Load Interconnection Customer is not ready to commence use of the \nParticipating TO’s Interconnection Facilities or Network Upgrades to take the delivery of \npower for the Large Load Facility’s Trial Operation, unless the Large Load \nInterconnection Customer would have been able to commence use of the Participating \nTO’s Interconnection Facilities or Network Upgrades to take the delivery of power for \nLarge Load Facility’s Trial Operation, but for the Participating TO’s delay; and (2) the \nParticipating TO’s failure to meet the specified dates is the result of the action or inaction \nof the Large Load Interconnection Customer or any other interconnection customer who \nhas entered into an interconnection agreement with the Participating TO and/or CAISO, \naction or inaction by the CAISO, or any cause beyond the Participating TO’s reasonable \ncontrol or reasonable ability to cure.   \nIn no event shall the Participating TO have any responsibility or liability to the Large \nLoad Interconnection Customer for liquidated damages pursuant to the provisions of this \nArticle 5.2. \n5.3 \nReserved."},{"page":245,"startToken":88404,"endToken":88813,"text":"13 \n5.4 \nEquipment Procurement. Participating TO shall commence design of the Participating \nTO’s Interconnection Facilities or Network Upgrades and procure necessary equipment \nas soon as practicable after all of the following conditions are satisfied, unless the Parties \notherwise agree in writing: \n5.4.1 The Participating TO has received written authorization to proceed with design and \nprocurement from the Large Load Interconnection Customer by the date specified \nin Appendix B, Milestones; and \n5.4.2 The Large Load Interconnection Customer has provided security to the \nParticipating TO in accordance with Article 11.3 by the dates specified in Appendix \nB, Milestones. \n5.5 \nConstruction Commencement. The Participating TO shall commence construction of \nthe Participating TO’s Interconnection Facilities and Network Upgrades for which it is \nresponsible as soon as practicable after the following additional conditions are satisfied: \n5.5.1 Approval of the appropriate Governmental Authority has been obtained for any \nfacilities requiring regulatory approval; \n5.5.2 Necessary real property rights and rights-of-way have been obtained, to the extent \nrequired for the construction of a discrete aspect of the Participating TO’s \nInterconnection Facilities and Network Upgrades; \n5.5.3 The Participating TO has received written authorization to proceed with \nconstruction from the Large Load Interconnection Customer by the date specified in \nAppendix B, Milestones; and \n5.5.4 The Large Load Interconnection Customer has provided payment and security to \nthe Participating TO in accordance with Article 11.3 by the dates specified in \nAppendix B, Milestones. \n5.6 \nWork Progress. The Parties will keep each other advised periodically as to the progress \nof their respective design, procurement and construction efforts. Any Party may, at any \ntime, request a progress report from another Party. If, at any time, the Large Load \nInterconnection Customer determines that the completion of the Participating TO’s \nInterconnection Facilities will not be required until after the specified In-Service Date, \nthe Large Load Interconnection Customer will provide written notice to the Participating \nTO and, as applicable, CAISO of such later date upon which the completion of the \nParticipating TO’s Interconnection Facilities will be required. \n5.7 \nInformation Exchange. As soon as reasonably practicable after the Effective Date, the \nParties shall exchange information regarding the design and compatibility of the Large \nLoad Interconnection Customer’s Interconnection Facilities and Participating TO’s \nInterconnection Facilities and compatibility of the Interconnection Facilities with the \nParticipating TO’s Transmission System, and shall work diligently and in good faith to \nmake any necessary design changes."},{"page":246,"startToken":88813,"endToken":89255,"text":"14 \n5.8 \nLimited Operation. If any of the Participating TO’s Interconnection Facilities or \nNetwork Upgrades are not reasonably expected to be completed prior to the Commercial \nOperation Date of the Large Load Facility, the Participating TO shall, upon the request \nand at the expense of the Large Load Interconnection Customer, perform operating \nstudies on a timely basis to determine the extent to which the Large Load Facility and the \nLarge Load Interconnection Customer’s Interconnection Facilities may operate prior to \nthe completion of the Participating TO’s Interconnection Facilities or Network Upgrades \nconsistent with Applicable Laws and Regulations, Applicable Reliability Standards, \nGood Utility Practice, and this LLIA. The Participating TO shall permit the Large Load \nInterconnection Customer to operate the Large Load Facility and the Large Load \nInterconnection Customer’s Interconnection Facilities in accordance with the results of \nsuch studies. \n5.9 \nLarge Load Interconnection Customer’s Interconnection Facilities. The Large Load \nInterconnection Customer shall, at its expense, design, procure, construct, own, and \ninstall the Large Load Interconnection Customer’s Interconnection Facilities, as set forth \nin Appendices A and H, as applicable. \n5.9.1 Large Load Facility and Large Load Interconnection Customer’s \nInterconnection Facilities Specifications. In addition to the Large Load \nInterconnection Customer’s responsibility to submit technical data with its Large \nLoad Interconnection Application, Large Load Interconnection Customer shall \nsubmit all remaining necessary specifications for the Large Load Interconnection \nCustomer’s Interconnection Facilities and Large Load Facility, including System \nProtection Facilities, to the Participating TO (who shall provide such information to \nthe CAISO) at least one hundred eighty (180) Calendar Days prior to the \nCommercial Operation Date. The Participating TO shall review such specifications \npursuant to this LLIA and the LLIP to ensure that the Large Load Interconnection \nCustomer’s Interconnection Facilities and Large Load Facility are compatible with \nthe technical specifications, operational control, safety requirements, and any other \napplicable requirements of the Participating TO and comment on such \nspecifications within thirty (30) Calendar Days of the Large Load Interconnection \nCustomer’s submission. All specifications provided hereunder shall be deemed \nconfidential. \n5.9.2 Participating TO’s Review. The Participating TO’s review of the Large Load \nInterconnection Customer’s final specifications shall not be construed as \nconfirming, endorsing, or providing a warranty as to the design, fitness, safety, \ndurability or reliability of the Large Load Facility, or the Large Load \nInterconnection Customer’s Interconnection Facilities. Large Load Interconnection \nCustomer shall make such changes to the Large Load Interconnection Customer’s \nInterconnection Facilities as may reasonably be required by the Participating TO, in \naccordance with Good Utility Practice, to ensure that the Large Load \nInterconnection Customer’s Interconnection Facilities are compatible with the \ntechnical specifications, Operational Control, and safety requirements of the \nParticipating TO."},{"page":247,"startToken":89255,"endToken":89738,"text":"15 \n5.9.3 Large Load Interconnection Customer’s Interconnection Facilities \nConstruction. The Large Load Interconnection Customer’s Interconnection \nFacilities shall be designed and constructed in accordance with Good Utility \nPractice. Within one hundred twenty (120) Calendar Days after the Commercial \nOperation Date, unless the Participating TO and Large Load Interconnection \nCustomer agree on another mutually acceptable deadline, the Large Load \nInterconnection Customer shall deliver to the Participating TO “as-built” drawings, \ninformation and documents for the Large Load Interconnection Customer’s \nInterconnection Facilities and the Large Load Facility(s), such as: a one-line \ndiagram, a site plan showing the Large Load Facility and the Large Load \nInterconnection Customer’s Interconnection Facilities, plan and elevation drawings \nshowing the layout of the Large Load Interconnection Customer’s Interconnection \nFacilities, a relay functional diagram, relaying AC and DC schematic wiring \ndiagrams and relay settings for all facilities associated with the Large Load \nInterconnection Customer’s step-up transformers, the facilities connecting the Large \nLoad Facility to the step-up transformers and the Large Load Interconnection \nCustomer’s Interconnection Facilities, and the impedances (determined by factory \ntests) for the associated step-up transformers and the Large Load Facilities. The \nLarge Load Interconnection Customer shall provide the Participating TO \nspecifications for the automatic voltage regulator, Large Load Facility control and \nprotection settings, transformer tap settings, and communications, if applicable. \nAny deviations from the relay settings, machine specifications, and other \nspecifications originally submitted by the Large Load Interconnection Customer \nshall be assessed by the Participating TO pursuant to the appropriate provisions of \nthis LLIA and the LLIP. \n5.10 \nParticipating TO’s Interconnection Facilities Construction. The Participating TO’s \nInterconnection Facilities shall be designed and constructed in accordance with Good \nUtility Practice. Upon request, within one hundred twenty (120) Calendar Days after the \nCommercial Operation Date, unless the Participating TO and Large Load Interconnection \nCustomer agree on another mutually acceptable deadline, the Participating TO shall \ndeliver to the Large Load Interconnection Customer and the CAISO the following: “as-\nbuilt” drawings, information and documents for the Participating TO’s Interconnection \nFacilities, including appropriate drawings and relay diagrams. \nThe Participating TO will obtain control for operating and maintenance purposes of the \nParticipating TO’s Interconnection Facilities upon completion of such facilities.  \n5.11 \nAccess Rights. Upon reasonable notice and supervision by a Party, and subject to any \nrequired or necessary regulatory approvals, a Party (“Granting Party”) shall furnish at no \ncost to the other Party (“Access Party”) any rights of use, licenses, rights of way and \neasements with respect to lands owned or controlled by the Granting Party, its agents (if \nallowed under the applicable agency agreement), or any Affiliate, that are necessary to \nenable the Access Party to obtain ingress and egress to construct, operate, maintain, \nrepair, test (or witness testing), inspect, replace or remove facilities and equipment to: (i) \ninterconnect the Large Load Facility with the Participating TO’s Transmission System; \n(ii) operate and maintain the Large  Load Facility, the Interconnection Facilities and the"},{"page":248,"startToken":89738,"endToken":90229,"text":"16 \nParticipating TO’s Transmission System; and (iii) disconnect or remove the Access \nParty’s facilities and equipment upon termination of this LLIA. In exercising such rights \nof use, licenses, rights of way and easements, the Access Party shall not unreasonably \ndisrupt or interfere with normal operation of the Granting Party’s business and shall \nadhere to the safety rules and procedures established in advance, as may be changed from \ntime to time, by the Granting Party and provided to the Access Party. \n5.12 \nLands of Other Property Owners. If any part of the Participating TO’s Interconnection \nFacilities and/or Network Upgrades are to be installed on property owned by persons \nother than the Large Load Interconnection Customer or Participating TO, the \nParticipating TO shall at the Large Load Interconnection Customer’s expense use efforts, \nsimilar in nature and extent to those that it typically undertakes on its own behalf or on \nbehalf of its Affiliates, including use of its eminent domain authority, and to the extent \nconsistent with state law, to procure from such persons any rights of use, licenses, rights \nof way and easements that are necessary to construct, operate, maintain, test, inspect, \nreplace or remove the Participating TO’s Interconnection Facilities and/or Network \nUpgrades upon such property. \n5.13 \nPermits. Participating TO and Large Load Interconnection Customer shall cooperate \nwith each other in good faith in obtaining all permits, licenses and authorizations that are \nnecessary to accomplish the interconnection in compliance with Applicable Laws and \nRegulations. With respect to this paragraph, the Participating TO shall provide permitting \nassistance to the Large Load Interconnection Customer comparable to that provided to \nthe Participating TO’s own, or an Affiliate’s generation. \n5.14 \nSuspension. The Large Load Interconnection Customer may request to suspend at any \ntime all work associated with the construction and installation of the Participating TO’s \nInterconnection Facilities, Network Upgrades, and/or Distribution Upgrades required \nunder this LLIA, other than Network Upgrades or Alternative Transmission Technologies \nsolutions identified in the Large Load Interconnection Studies that are not subject to \nsuspension. Large Load Interconnection Customers seeking to suspend construction will \nprovide the Participating TO a request to suspend.  The Participating TO shall evaluate a \nrequest to suspend work submitted pursuant to this Article 5.14 and may approve \nsuspension requests where the Participating TO’s Transmission System can be left in a \nsafe and reliable condition in accordance with Good Utility Practice, the Participating \nTO’s safety and reliability criteria, and Applicable Reliability Standards and Participating \nTO will not be subject to financial harm.  \n5.15 \nTaxes. \n5.15.1 Large Load Interconnection Customer Payments Not Taxable. The Parties \nintend that all payments or property transfers made by the Large Load \nInterconnection Customer to the Participating TO for the installation of the \nParticipating TO’s Interconnection Facilities and the Network Upgrades shall be \nnon-taxable, either as contributions to capital, or as a refundable advance, in \naccordance with the Internal Revenue Code and any applicable state income tax"},{"page":249,"startToken":90229,"endToken":90768,"text":"17 \nlaws and shall not be taxable as contributions in aid of construction or otherwise \nunder the Internal Revenue Code and any applicable state income tax laws. \n5.15.2 Representations And Covenants. In accordance with IRS Notice 2001-82 and IRS \nNotice 88-129, the Large Load Interconnection Customer represents and covenants \nthat: (i) for income tax purposes, the amount of any payments and the cost of any \nproperty transferred to the Participating TO for the Participating TO’s \nInterconnection Facilities will be capitalized by the Large Load Interconnection \nCustomer as an intangible asset and recovered using the straight-line method over a \nuseful life of twenty (20) years; and (ii) any portion of the Participating TO’s \nInterconnection Facilities that is a “dual-use intertie,” within the meaning of IRS \nNotice 88-129, is reasonably expected to carry only a de minimis amount of \nelectricity away from the Large Load Facility. For this purpose, “de minimis \namount” means no more than 5 percent of the total power flows in both directions, \ncalculated in accordance with the “5 percent test” set forth in IRS Notice 88-129. \nThis is not intended to be an exclusive list of the relevant conditions that must be \nmet to conform to IRS requirements for non-taxable treatment. \nAt the Participating TO’s request, the Large Load Interconnection Customer shall \nprovide the Participating TO with a report from an independent engineer \nconfirming its representation in clause (iii), above. The Participating TO \nrepresents and covenants that the cost of the Participating TO’s Interconnection \nFacilities paid for by the Large Load Interconnection Customer without the \npossibility of refund or credit will have no net effect on the base upon which rates \nare determined. \n5.15.3 Indemnification for the Cost Consequence of Current Tax Liability Imposed \nUpon the Participating TO. Notwithstanding Article 5.15.1, the Large Load \nInterconnection Customer shall protect, indemnify and hold harmless the \nParticipating TO from the cost consequences of any current tax liability imposed \nagainst the Participating TO as the result of payments or property transfers made by \nthe Large Load Interconnection Customer to the Participating TO under this LLIA \nfor Interconnection Facilities, as well as any interest and penalties, other than \ninterest and penalties attributable to any delay caused by the Participating TO. The \nParticipating TO shall not include a gross-up for the cost consequences of any \ncurrent tax liability in the amounts it charges the Large Load Interconnection \nCustomer under this LLIA unless (i) the Participating TO has determined, in good \nfaith, that the payments or property transfers made by the Large Load \nInterconnection Customer to the Participating TO should be reported as income \nsubject to taxation or (ii) any Governmental Authority directs the Participating TO \nto report payments or property as income subject to taxation; provided, however, \nthat the Participating TO may require the Large Load Interconnection Customer to \nprovide security for Interconnection Facilities, in a form reasonably acceptable to \nthe Participating TO (such as a parental guarantee or a letter of credit), in an amount \nequal to the cost consequences of any current tax liability under this Article 5.15. \nThe Large Load Interconnection Customer shall reimburse the Participating TO for \nsuch costs on a fully grossed-up basis, in accordance with Article 5.15.4, within"},{"page":250,"startToken":90768,"endToken":91304,"text":"18 \nthirty (30) Calendar Days of receiving written notification from the Participating \nTO of the amount due, including detail about how the amount was calculated. \nThe indemnification obligation shall terminate at the earlier of (1) the expiration \nof the ten year testing period and the applicable statute of limitation, as it may be \nextended by the Participating TO upon request of the IRS, to keep these years \nopen for audit or adjustment, or (2) the occurrence of a subsequent taxable event \nand the payment of any related indemnification obligations as contemplated by \nthis Article 5.15. \n5.15.4 Tax Gross-Up Amount. The Large Load Interconnection Customer’s liability for \nthe cost consequences of any current tax liability under this Article 5.15 shall be \ncalculated on a fully grossed-up basis. Except as may otherwise be agreed to by the \nParties, this means that the Large Load Interconnection Customer will pay the \nParticipating TO, in addition to the amount paid for the Interconnection Facilities \nand Network Upgrades, an amount equal to (1) the current taxes imposed on the \nParticipating TO (“Current Taxes”) on the excess of (a) the gross income realized \nby the Participating TO as a result of payments or property transfers made by the \nLarge Load Interconnection Customer to the Participating TO under this LLIA \n(without regard to any payments under this Article 5.15) (the “Gross Income \nAmount”) over (b) the present value of future tax deductions for depreciation that \nwill be available as a result of such payments or property transfers (the “Present \nValue Depreciation Amount”), plus (2) an additional amount sufficient to permit \nthe Participating TO to receive and retain, after the payment of all Current Taxes, \nan amount equal to the net amount described in clause (1). \nFor this purpose, (i) Current Taxes shall be computed based on the Participating \nTO’s composite federal and state tax rates at the time the payments or property \ntransfers are received and the Participating TO will be treated as being subject to \ntax at the highest marginal rates in effect at that time (the “Current Tax Rate”), \nand (ii) the Present Value Depreciation Amount shall be computed by discounting \nthe Participating TO’s anticipated tax depreciation deductions as a result of such \npayments or property transfers by the Participating TO’s current weighted average \ncost of capital. Thus, the formula for calculating the Large Load Interconnection \nCustomer’s liability to the Participating TO pursuant to this Article 5.15.4 can be \nexpressed as follows: (Current Tax Rate x (Gross Income Amount – Present \nValue of Tax Depreciation))/(1-Current Tax Rate). Large Load Interconnection \nCustomer’s estimated tax liability in the event taxes are imposed shall be stated in \nAppendix A, Interconnection Facilities, Network Upgrades and Distribution \nUpgrades. \n5.15.5 Private Letter Ruling or Change or Clarification of Law. At the Large Load \nInterconnection Customer’s request and expense, the Participating TO shall file \nwith the IRS a request for a private letter ruling as to whether any property \ntransferred or sums paid, or to be paid, by the Large Load Interconnection Customer \nto the Participating TO under this LLIA are subject to federal income taxation. The \nLarge Load Interconnection Customer will prepare the initial draft of the request for"},{"page":251,"startToken":91304,"endToken":91833,"text":"19 \na private letter ruling, and will certify under penalties of perjury that all facts \nrepresented in such request are true and accurate to the best of the Large Load \nInterconnection Customer’s knowledge. The Participating TO and Large Load \nInterconnection Customer shall cooperate in good faith with respect to the \nsubmission of such request, provided, however, the Large Load Interconnection \nCustomer and the Participating TO explicitly acknowledge (and nothing herein is \nintended to alter) Participating TO’s obligation under law to certify that the facts \npresented in the ruling request are true, correct and complete. \nThe Participating TO shall keep the Large Load Interconnection Customer fully \ninformed of the status of such request for a private letter ruling and shall execute \neither a privacy act waiver or a limited power of attorney, in a form acceptable to \nthe IRS, that authorizes the Large Load Interconnection Customer to participate in \nall discussions with the IRS regarding such request for a private letter ruling. The \nParticipating TO shall allow the Large Load Interconnection Customer to attend \nall meetings with IRS officials about the request and shall permit the Large Load \nInterconnection Customer to prepare the initial drafts of any follow-up letters in \nconnection with the request. \n5.15.6 Subsequent Taxable Events. If, within ten (10) years from the date on which the \nrelevant Participating TO’s Interconnection Facilities are placed in service, (i) the \nLarge Load Interconnection Customer Breaches the covenants contained in Article \n5.15.2, (ii) a “disqualification event” occurs within the meaning of IRS Notice 88-\n129, or (iii) this LLIA terminates and the Participating TO retains ownership of the \nInterconnection Facilities and Network Upgrades, the Large Load Interconnection \nCustomer shall pay a tax gross-up for the cost consequences of any current tax \nliability imposed on the Participating TO, calculated using the methodology \ndescribed in Article 5.15.4 and in accordance with IRS Notice 9060. \n5.15.7 Contests. In the event any Governmental Authority determines that the \nParticipating TO’s receipt of payments or property constitutes income that is subject \nto taxation, the Participating TO shall notify the Large Load Interconnection \nCustomer, in writing, within thirty (30) Calendar Days of receiving notification of \nsuch determination by a Governmental Authority. Upon the timely written request \nby the Large Load Interconnection Customer and at the Large Load Interconnection \nCustomer’s sole expense, the Participating TO may appeal, protest, seek abatement \nof, or otherwise oppose such determination. Upon the Large Load Interconnection \nCustomer’s written request and sole expense, the Participating TO may file a claim \nfor refund with respect to any taxes paid under this Article 5.15, whether or not it \nhas received such a determination. The Participating TO reserves the right to make \nall decisions with regard to the prosecution of such appeal, protest, abatement or \nother contest, including the selection of counsel and compromise or settlement of \nthe claim, but the Participating TO shall keep the Large Load Interconnection \nCustomer informed, shall consider in good faith suggestions from the Large Load \nInterconnection Customer about the conduct of the contest, and shall reasonably \npermit the Large Load Interconnection Customer or an Large Load Interconnection \nCustomer representative to attend contest proceedings."},{"page":252,"startToken":91833,"endToken":92331,"text":"20 \nThe Large Load Interconnection Customer shall pay to the Participating TO on a \nperiodic basis, as invoiced by the Participating TO, the Participating TO’s \ndocumented reasonable costs of prosecuting such appeal, protest, abatement or \nother contest, including any costs associated with obtaining the opinion of \nindependent tax counsel described in this Article 5.15.7. The Participating TO \nmay abandon any contest if the Large Load Interconnection Customer fails to \nprovide payment to the Participating TO within thirty (30) Calendar Days of \nreceiving such invoice. \nAt any time during the contest, the Participating TO may agree to a settlement \neither with the Large Load Interconnection Customer’s consent or, if such consent \nis refused, after obtaining written advice from independent nationally-recognized \ntax counsel, selected by the Participating TO, but reasonably acceptable to the \nLarge Load Interconnection Customer, that the proposed settlement represents a \nreasonable settlement given the hazards of litigation. The Large Load \nInterconnection Customer’s obligation shall be based on the amount of the \nsettlement agreed to by the Large Load Interconnection Customer, or if a higher \namount, so much of the settlement that is supported by the written advice from \nnationally-recognized tax counsel selected under the terms of the preceding \nparagraph. The settlement amount shall be calculated on a fully grossed-up basis \nto cover any related cost consequences of the current tax liability. The \nParticipating TO may also settle any tax controversy without receiving the Large \nLoad Interconnection Customer’s consent or any such written advice; however, \nany such settlement will relieve the Large Load Interconnection Customer from \nany obligation to indemnify the Participating TO for the tax at issue in the contest \n(unless the failure to obtain written advice is attributable to the Large Load \nInterconnection Customer’s unreasonable refusal to the appointment of \nindependent tax counsel). \n5.15.8 Refund. In the event that: (a) a private letter ruling is issued to the Participating TO \nwhich holds that any amount paid or the value of any property transferred by the \nLarge Load Interconnection Customer to the Participating TO under the terms of \nthis LLIA is not subject to federal income taxation; (b) any legislative change or \nadministrative announcement, notice, ruling or other determination makes it \nreasonably clear to the Participating TO in good faith that any amount paid or the \nvalue of any property transferred by the Large Load Interconnection Customer to \nthe Participating TO under the terms of this LLIA is not taxable to the Participating \nTO; (c) any abatement, appeal, protest, or other contest results in a determination \nthat any payments or transfers made by the Large Load Interconnection Customer \nto the Participating TO are not subject to federal income tax; or (d) if the \nParticipating TO receives a refund from any taxing authority for any overpayment \nof tax attributable to any payment or property transfer made by the Large Load \nInterconnection Customer to the Participating TO pursuant to this LLIA, the \nParticipating TO shall promptly refund to the Large Load Interconnection Customer \nthe following:"},{"page":253,"startToken":92331,"endToken":92826,"text":"21 \n(i) \nany payment made by Large Load Interconnection Customer under this \nArticle 5.15 for taxes that is attributable to the amount determined to be \nnon-taxable, together with interest thereon, \n(ii) \ninterest on any amounts paid by the Large Load Interconnection Customer \nto the Participating TO for such taxes which the Participating TO did not \nsubmit to the taxing authority, calculated in accordance with the \nmethodology set forth in FERC’s regulations at 18 C.F.R. \n§35.19a(a)(2)(iii) from the date payment was made by the Large Load \nInterconnection Customer to the date the Participating TO refunds such \npayment to the Large Load Interconnection Customer, and \n(iii) \nwith respect to any such taxes paid by the Participating TO, any refund or \ncredit the Participating TO receives or to which it may be entitled from \nany Governmental Authority, interest (or that portion thereof attributable \nto the payment described in clause (i), above) owed to the Participating \nTO for such overpayment of taxes (including any reduction in interest \notherwise payable by the Participating TO to any Governmental Authority \nresulting from an offset or credit); provided, however, that the \nParticipating TO will remit such amount promptly to the Large Load \nInterconnection Customer only after and to the extent that the Participating \nTO has received a tax refund, credit or offset from any Governmental \nAuthority for any applicable overpayment of income tax related to the \nParticipating TO’s Interconnection Facilities. \nThe intent of this provision is to leave the Parties, to the extent practicable, in the \nevent that no taxes are due with respect to any payment for Interconnection \nFacilities and Network Upgrades hereunder, in the same position they would have \nbeen in had no such tax payments been made. \n5.15.9 Taxes Other Than Income Taxes. Upon the timely request by the Large Load \nInterconnection Customer, and at the Large Load Interconnection Customer’s sole \nexpense, the Participating TO may appeal, protest, seek abatement of, or otherwise \ncontest any tax (other than federal or state income tax) asserted or assessed against \nthe Participating TO for which the Large Load Interconnection Customer may be \nrequired to reimburse the Participating TO under the terms of this LLIA. The Large \nLoad Interconnection Customer shall pay to the Participating TO on a periodic \nbasis, as invoiced by the Participating TO, the Participating TO’s documented \nreasonable costs of prosecuting such appeal, protest, abatement, or other contest. \nThe Large Load Interconnection Customer and the Participating TO shall cooperate \nin good faith with respect to any such contest. Unless the payment of such taxes is a \nprerequisite to an appeal or abatement or cannot be deferred, no amount shall be \npayable by the Large Load Interconnection Customer to the Participating TO for \nsuch taxes until they are assessed by a final, non-appealable order by any court or \nagency of competent jurisdiction. In the event that a tax payment is withheld and \nultimately due and payable after appeal, the Large Load Interconnection Customer"},{"page":254,"startToken":92826,"endToken":93296,"text":"22 \nwill be responsible for all taxes, interest and penalties, other than penalties \nattributable to any delay caused by the Participating TO. \n5.16 \nTax Status. Each Party shall cooperate with the others to maintain the other Parties’ tax \nstatus.  \nArticle 6. Large Load Interconnection Testing and Inspection \n6.1 \nPre-Commercial Operation Date Testing and Modifications. Prior to the Commercial \nOperation Date, the Participating TO shall test the Participating TO’s Interconnection \nFacilities, Network Upgrades, and Distribution Upgrades and the Large Load \nInterconnection Customer shall test the Large Load Facility and the Large Load \nInterconnection Customer’s Interconnection Facilities to ensure their safe and reliable \noperation. Similar testing may be required after initial operation. Each Party shall make \nany modifications to its facilities that are found to be necessary as a result of such testing. \nThe Large Load Interconnection Customer shall bear the cost of all such testing and \nmodifications. \n6.2 \nPost-Commercial Operation Date Testing and Modifications. Each Party shall at its \nown expense perform routine inspection and testing of its facilities and equipment in \naccordance with Good Utility Practice as may be necessary to ensure the continued \ninterconnection of the Large Load Facility with the Participating TO’s Transmission \nSystem in a safe and reliable manner. Each Party shall have the right, upon advance \nwritten notice, to require reasonable additional testing of the other Party’s facilities, at the \nrequesting Party’s expense, as may be in accordance with Good Utility Practice. \n6.3 \nRight to Observe Testing. Each Party shall notify the other Parties at least fourteen (14) \nCalendar Days in advance of its performance of tests of its Interconnection Facilities or \nLarge Load Facility. The other Parties have the right, at their own expense, to observe \nsuch testing. \n6.4 \nRight to Inspect. Each Party shall have the right, but shall have no obligation to: (i) \nobserve another Party’s tests and/or inspection of any of its System Protection Facilities \nand other protective equipment; (ii) review the settings of another Party’s System \nProtection Facilities and other protective equipment; and (iii) review another Party’s \nmaintenance records relative to the Interconnection Facilities, the System Protection \nFacilities and other protective equipment. A Party may exercise these rights from time to \ntime as it deems necessary upon reasonable notice to the other Party. The exercise or non-\nexercise by a Party of any such rights shall not be construed as an endorsement or \nconfirmation of any element or condition of the Interconnection Facilities or the System \nProtection Facilities or other protective equipment or the operation thereof, or as a \nwarranty as to the fitness, safety, desirability, or reliability of same. Any information that \na Party obtains through the exercise of any of its rights under this Article 6.4 shall be \ndeemed to be Confidential Information and treated pursuant to Article 22 of this LLIA."},{"page":255,"startToken":93296,"endToken":93786,"text":"23 \nArticle 7. Metering \n7.1 \nGeneral. Each Party shall comply with any Applicable Reliability Standards and the \nApplicable Reliability Council requirements. Unless otherwise agreed by the \nParticipating TO and the Large Load Interconnection Customer, the Participating TO \nmay install additional Metering Equipment at the Point of Interconnection of the Large \nLoad Facility, and shall own, operate, test and maintain such Metering Equipment. Power \nflows to the Large Load Facility shall be measured at or, at the Participating TO’s option \nfor its respective Metering Equipment, compensated to, the Point of Interconnection.  The \nLarge Load Interconnection Customer shall also install meters at each load block and at \neach individual generation source to accurately capture the demand/generation and power \nfactor of these facilities.  The Large Load Interconnection Customer shall bear all \nreasonable documented costs associated with the purchase, installation, operation, testing \nand maintenance of the Metering Equipment. \n7.2 \nCheck Meters. The Large Load Interconnection Customer, at its option and expense, \nmay install and operate, on its premises and on its side of the Point of Interconnection, \none or more check meters to check the Participating TO’s meters. Such check meters \nshall be for check purposes only and shall not be used for the measurement of power \nflows for purposes of this LLIA, except in the case that no other means are available on a \ntemporary basis at the option of the Participating TO. The check meters shall be subject \nat all reasonable times to inspection and examination by the Participating TO or their \ndesignees. The installation, operation and maintenance thereof shall be performed \nentirely by the Large Load Interconnection Customer in accordance with Good Utility \nPractice. \n7.3 \nParticipating TO Retail Metering. The Participating TO may install retail revenue \nquality meters and associated equipment, pursuant to the Participating TO’s applicable \nretail tariffs. \nArticle 8. Communications \n8.1 \nLarge Load Interconnection Customer Obligations. The Large Load Interconnection \nCustomer shall maintain satisfactory operating communications with the Participating TO \nand, as applicable, the CAISO in accordance with the provisions of the CAISO Tariff and \nwith the Participating TO’s dispatcher or representative designated by the Participating \nTO. The Large Load Interconnection Customer shall provide standard voice line, \ndedicated voice line and facsimile communications at its Large Load Facility control \nroom or central dispatch facility through use of either the public telephone system, or a \nvoice communications system that does not rely on the public telephone system. The \nLarge Load Interconnection Customer shall also provide two (2) independent dedicated \ndata circuit(s) necessary to provide Large Load Interconnection Customer data to the \nParticipating TO and, as applicable, the CAISO pursuant to the CAISO Tariff.  The data \ncircuit(s) shall extend from the Large Load Facility to the location(s) specified by the \nParticipating TO and, as applicable, the CAISO. Any required maintenance of such \ncommunications equipment shall be performed by the Large Load Interconnection \nCustomer. Operational communications shall be activated and maintained under, but not"},{"page":256,"startToken":93786,"endToken":94264,"text":"24 \nlimited to, the following events: system paralleling or separation, scheduled and \nunscheduled shutdowns, equipment clearances, and hourly and daily load data. \n8.2 \nRemote Terminal Unit. Prior to the interconnection of a Large Load Facility, a remote \nterminal unit, or equivalent data collection and transfer equipment acceptable to the \nParties, shall be installed by the Large Load Interconnection Customer, or by the \nParticipating TO at the Large Load Interconnection Customer’s expense, to gather \naccumulated and instantaneous data to be telemetered to the location(s) designated by the \nParticipating TO and, as applicable, the CAISO through use of a dedicated point-to-point \ndata circuit(s) as indicated in Article 8.1. \nFor telemetry to the Participating TO, the communication protocol for the data circuit(s) \nshall be specified by the Participating TO. Telemetry to the CAISO shall be provided in \naccordance with the CAISO’s technical standards for direct telemetry. Instantaneous bi-\ndirectional real power and reactive power flow and any other required information must \nbe telemetered directly to the location(s) specified by the Participating TO. \nEach Party will promptly advise the other Parties if it detects or otherwise learns of any \nmetering, telemetry or communications equipment errors or malfunctions that require the \nattention and/or correction by another Party. The Party owning such equipment shall \ncorrect such error or malfunction as soon as reasonably feasible. \n8.3 \nNo Annexation. Any and all equipment placed on the premises of a Party shall be and \nremain the property of the Party providing such equipment regardless of the mode and \nmanner of annexation or attachment to real property, unless otherwise mutually agreed by \nthe Parties. \nArticle 9.  Large Load Interconnection Customer Operations \n9.1 \nGeneral. Each Party shall comply with Applicable Reliability Standards and the \nApplicable Reliability Council requirements. Each Party shall provide to the other Party \nall information that may reasonably be required by the other Party to comply with \nApplicable Laws and Regulations and Applicable Reliability Standards. \n9.2 \nParticipating TO Obligations.  The Participating TO at the Large Load Interconnection \nCustomer’s expense shall cause the Participating TO’s Interconnection Facilities to be \noperated, maintained and controlled in a safe and reliable manner and in accordance with \nthis LLIA. The Participating TO may provide operating instructions to the Large Load \nInterconnection Customer consistent with this LLIA and Participating TO operating \nprotocols and procedures as they may change from time to time. The Participating TO \nwill consider changes to their operating protocols and procedures proposed by the Large \nLoad Interconnection Customer. \n9.3 \nLarge Load Interconnection Customer Obligations. The Large Load Interconnection \nCustomer shall at its own expense operate, maintain, and control the Large Load Facility \nand the Large Load Interconnection Customer’s Interconnection Facilities in a safe and \nreliable manner and in accordance with this LLIA. The Large Load Interconnection \nCustomer shall operate the Large Load Facility and the Large Load Interconnection"},{"page":257,"startToken":94264,"endToken":94705,"text":"25 \nCustomer’s Interconnection Facilities in accordance with all applicable requirements of \nthe Balancing Authority Area of which it is part, if any, including such requirements as \nset forth in Appendix C, Interconnection Details, of this LLIA. Appendix C, \nInterconnection Details, will be modified to reflect changes to the requirements as they \nmay change from time to time. A Party may request that another Party provide copies of \nthe requirements set forth in Appendix C, Interconnection Details, of this LLIA.  \n9.4 \nReactive Power and Primary Frequency Response.  Large Load Interconnection \nCustomer will design the Large Load Facility and Behind-the-Meter facility to maintain a \ncomposite power factor within the range of 0.99 leading to 0.97 lagging at the Point of \nInterconnection, unless the Participating TO established a different requirement that \napplies to all Large Loads connected to its system or the CAISO has establishes different \nrequirements that apply to all Large Loads in the CAISO Balancing Authority Area on a \ncomparable basis.    \n9.5 \nDisconnection from the Grid: The Participating TO will have the right to remotely \ndisconnect the Large Load Facility under conditions specific operation conditions \nidentified in the Large Load System Impact Study or under conditions where \ndisconnecting the Large Load Facility is required to maintain transmission system \nreliability and stability. \n9.6 \nOutages and Interruptions. \n9.6.1 Outages. \n9.6.1.1 Outage Authority and Coordination. Each Party may in accordance \nwith Good Utility Practice in coordination with the other Parties remove \nfrom service any of its respective Interconnection Facilities or Network \nUpgrades that may impact another Party’s facilities as necessary to \nperform maintenance or testing or to install or replace equipment. Absent \nan Emergency Condition, the Party scheduling a removal of such \nfacility(ies) from service will use Reasonable Efforts to schedule such \nremoval on a date and time mutually acceptable to all Parties. In all \ncircumstances any Party planning to remove such facility(ies) from service \nshall use Reasonable Efforts to minimize the effect on the other Parties of \nsuch removal. \n9.6.1.2 Outage Schedules. The Large Load Interconnection Customer Shall \nsubmit its planned facility maintenance schedules no less than thirty (30) \ndays in advance of the event.   \n9.6.1.3 Outage Restoration. If an outage on a Party’s Interconnection Facilities \nor Network Upgrades adversely affects another Party’s operations or \nfacilities, the Party that owns or controls the facility that is out of service \nshall use Reasonable Efforts to promptly restore such facility(ies) to a \nnormal operating condition consistent with the nature of the outage. The \nParty that owns or controls the facility that is out of service shall provide"},{"page":258,"startToken":94705,"endToken":95138,"text":"26 \nthe other Parties, to the extent such information is known, information on \nthe nature of the Emergency Condition, if the outage is caused by an \nEmergency Condition, an estimated time of restoration, and any corrective \nactions required. Initial verbal notice shall be followed up as soon as \npracticable with written notice explaining the nature of the outage, if \nrequested by a Party, which may be provided by e-mail or facsimile. \n9.6.2 Interruption of Service. If required by Good Utility Practice to do so, the \nParticipating TO may require the Large Load Interconnection Customer to interrupt \nor reduce its receipt of deliveries of electricity if such receipt of electricity could \nadversely affect the Participating TO’s ability to perform such activities as are \nnecessary to safely and reliably operate and maintain the Participating TO’s electric \nsystem. The following provisions shall apply to any interruption or reduction \npermitted under this Article 9.6.2: \n9.6.2.1 The interruption or reduction shall continue only for so long as reasonably \nnecessary under Good Utility Practice; \n9.6.2.2 Any such interruption or reduction shall be made on an equitable, non- \ndiscriminatory basis with respect to all load directly connected to the \nParticipating TO, subject to any conditions specified in this LLIA; \n9.6.2.3 When the interruption or reduction must be made under circumstances \nwhich do not allow for advance notice, the Participating TO shall notify \nthe Large Load Interconnection Customer by telephone as soon as \npracticable of the reasons for the curtailment, interruption, or reduction, \nand, if known, its expected duration. Telephone notification shall be \nfollowed by written notification, if requested by the Large Load \nInterconnection Customer, as soon as practicable; \n9.6.2.4 Except during the existence of an Emergency Condition, the Participating \nTO shall notify the Large Load Interconnection Customer in advance \nregarding the timing of such interruption or reduction and further notify \nthe Large Load Interconnection Customer of the expected duration. The \nParticipating TO shall coordinate with the Large Load Interconnection \nCustomer using Good Utility Practice to schedule the interruption or \nreduction during periods of least impact to the Large Load Interconnection \nCustomer, the CAISO, and the Participating TO; \n9.6.2.5 The Parties shall cooperate and coordinate with each other to the extent \nnecessary in order to restore the Large Load Facility, Interconnection \nFacilities, the Participating TO’s Transmission System, and the CAISO \nControlled Grid to their normal operating state, consistent with system \nconditions and Good Utility Practice. \n9.6.3 Under-Frequency and Over-Frequency Conditions. The Large Load \nInterconnection Customer shall implement under-frequency and over-frequency"},{"page":259,"startToken":95138,"endToken":95522,"text":"27 \nprotection set points for the Large Load Facility as required by Applicable \nReliability Standards and the Applicable Reliability Council to ensure “ride \nthrough” capability. Large Load Facility response to frequency deviations of pre-\ndetermined magnitudes, both under-frequency and over-frequency deviations, shall \nbe studied and coordinated with the Participating TO and the CAISO in accordance \nwith Good Utility Practice. The term “ride through” as used herein shall mean the \nability of a Generating Facility to stay connected to and synchronized with the \nCAISO Controlled Grid during system disturbances within a range of under-\nfrequency and over-frequency conditions, in accordance with Good Utility Practice. \nThe Large Load Interconnection Customer is required to satisfy all current and \nfuture frequency ride through requirement established by Western Electricity \nCoordinating Council or NERC. \n9.6.4 System Protection and Other Control Requirements. \n9.6.4.1 System Protection Facilities. The Large Load Interconnection Customer \nshall, at its expense, install, operate, and maintain System Protection \nFacilities as a part of the Large Load Facility or the Large Load \nInterconnection Customer’s Interconnection Facilities. The Participating \nTO shall install at the Large Load Interconnection Customer’s expense \nany System Protection Facilities that may be required on the Participating \nTO’s Interconnection Facilities or the Participating TO’s Transmission \nSystem as a result of the interconnection of the Large Load Facility and \nthe Large Load Interconnection Customer’s Interconnection Facilities. \n9.6.4.2 The Participating TO’s and Large Load Interconnection Customer’s \nprotection facilities shall be designed and coordinated with other systems \nin accordance with Applicable Reliability Standards, Applicable \nReliability Council criteria, and Good Utility Practice. \n9.6.4.3 The Participating TO and Large Load Interconnection Customer shall each \nbe responsible for protection of its facilities consistent with Good Utility \nPractice. \n9.6.4.4 The Participating TO’s and Large Load Interconnection Customer’s \nprotective relay design shall incorporate the necessary test switches to \nperform the tests required in Article 6. The required test switches will be \nplaced such that they allow operation of lockout relays while preventing \nbreaker failure schemes from operating and causing unnecessary breaker \noperations and/or the tripping of the Large Load Interconnection \nCustomer’s Large Load Facilities. \n9.6.4.5 The Participating TO and Large Load Interconnection Customer will test, \noperate and maintain System Protection Facilities in accordance with \nGood Utility Practice."},{"page":260,"startToken":95522,"endToken":95981,"text":"28 \n9.6.4.6 Prior to the In-Service Date, and again prior to the Commercial Operation \nDate, the Participating TO and Large Load Interconnection Customer or \ntheir agents shall perform a complete calibration test and functional trip \ntest of the System Protection Facilities. At intervals suggested by Good \nUtility Practice, the standards and procedures of the Participating TO, \nincluding, if applicable, the requirements of the Participating TO’s \nInterconnection Handbook, and following any apparent malfunction of the \nSystem Protection Facilities, each Party shall perform both calibration and \nfunctional trip tests of its System Protection Facilities. These tests do, \nhowever, require that all protective relays and lockout contacts be \nactivated. \n9.6.5 Requirements for Protection. In compliance with Good Utility Practice and, the \nLarge Load Interconnection Customer shall provide, install, own, and maintain \nrelays, circuit breakers and all other devices necessary to remove any fault \ncontribution of the Large Load Facility to any short circuit occurring on the \nParticipating TO’s Transmission System not otherwise isolated by the Participating \nTO’s equipment, such that the removal of the fault contribution shall be coordinated \nwith the protective requirements of the Participating TO’s Transmission System. \nSuch protective equipment shall include, without limitation, a disconnecting device \nwith fault current-interrupting capability located between the Large Load Facility \nand the Participating TO’s Transmission System at a site selected upon mutual \nagreement (not to be unreasonably withheld, conditioned or delayed) of the Parties. \nThe Large Load Interconnection Customer shall be responsible for protection of the \nLarge Load Facility and the Large Load Interconnection Customer’s other \nequipment from such conditions as negative sequence currents, over- or under-\nfrequency, sudden load rejection, over- or under-voltage, and generator loss-of-\nfield. The Large Load Interconnection Customer shall be solely responsible to \ndisconnect the Large Load Facility and the Large Load Interconnection Customer’s \nother equipment if conditions on the CAISO Controlled Grid could adversely affect \nthe Large Load Facility. \n9.6.6 Power Quality. Large Load Interconnection Customer’s facilities shall not cause \nexcessive voltage flicker nor introduce excessive voltage and harmonic distortion to \nthe sinusoidal voltage or current waves as defined by ANSI Standard C84.1-1989, \nin accordance with IEEE Standard 519, any applicable superseding electric industry \nstandard, or any alternative Applicable Reliability Standard or Applicable \nReliability Council standard. In the event of a conflict among ANSI Standard \nC84.1-1989, any applicable superseding electric industry standard, or any \nalternative Applicable Reliability Standard or Applicable Reliability Council \nstandard, the alternative Applicable Reliability Standard or Applicable Reliability \nCouncil standard shall control. \n9.7 \nSwitching and Tagging Rules. Each Party shall provide the other Parties a copy of its \nswitching and tagging rules that are applicable to the other Parties’ activities. Such \nswitching and tagging rules shall be developed on a non-discriminatory basis. The Parties"},{"page":261,"startToken":95981,"endToken":96406,"text":"29 \nshall comply with applicable switching and tagging rules, as amended from time to time, \nin obtaining clearances for work or for switching operations on equipment. \n9.8 \nUse of Interconnection Facilities by Third Parties. \n9.8.1 Purpose of Interconnection Facilities. Except as may be required by Applicable \nLaws and Regulations, or as otherwise agreed to among the Parties, the \nInterconnection Facilities shall be constructed for the sole purpose of \ninterconnecting the Large Load Facility to the Participating TO’s Transmission \nSystem and shall be used for no other purpose. \n9.8.2 Third Party Users. If required by Applicable Laws and Regulations or if the \nParties mutually agree, such agreement not to be unreasonably withheld, to allow \none or more third parties to use the Participating TO’s Interconnection Facilities, or \nany part thereof, the Large Load Interconnection Customer will be entitled to \ncompensation for the capital expenses it incurred in connection with the \nInterconnection Facilities based upon the pro rata use of the Interconnection \nFacilities by the Participating TO, all third party users, and the Large Load \nInterconnection Customer, in accordance with Applicable Laws and Regulations or \nupon some other mutually-agreed upon methodology. In addition, cost \nresponsibility for ongoing costs, including operation and maintenance costs \nassociated with the Interconnection Facilities, will be allocated between the Large \nLoad Interconnection Customer and any third party users based upon the pro rata \nuse of the Interconnection Facilities by the Participating TO, all third party users, \nand the Large Load Interconnection Customer, in accordance with Applicable Laws \nand Regulations or upon some other mutually agreed upon methodology. If the \nissue of such compensation or allocation cannot be resolved through such \nnegotiations, it shall be submitted to FERC for resolution. \n9.9 \nDisturbance Analysis Data Exchange. The Parties will cooperate with one another in \nthe analysis of disturbances to either the Large Load Facility or the Participating TO \nTransmission System by gathering and providing access to any information relating to \nany disturbance, including information from oscillography, protective relay targets, \nbreaker operations and sequence of events records, and any disturbance information \nrequired by Good Utility Practice. \nArticle 10. Maintenance \n10.1 \nParticipating TO Obligations. The Participating TO shall maintain the Participating \nTO’s Transmission System and the Participating TO’s Interconnection Facilities in a safe \nand reliable manner and in accordance with this LLIA. \n10.2 \nLarge Load Interconnection Customer Obligations. The Large Load Interconnection \nCustomer shall maintain the Large Load Facility and the Large Load Interconnection \nCustomer’s Interconnection Facilities in a safe and reliable manner and in accordance \nwith this LLIA."},{"page":262,"startToken":96406,"endToken":96846,"text":"30 \n10.3 \nCoordination. The Parties shall confer regularly to coordinate the planning, scheduling \nand performance of preventive and corrective maintenance on the Large Load Facility \nand the Interconnection Facilities. \n10.4 \nSecondary Systems. The Participating TO and Large Load Interconnection Customer \nshall cooperate with the other Parties in the inspection, maintenance, and testing of \ncontrol or power circuits that operate below 600 volts, AC or DC, including, but not \nlimited to, any hardware, control or protective devices, cables, conductors, electric \nraceways, secondary equipment panels, transducers, batteries, chargers, and voltage and \ncurrent transformers that directly affect the operation of a Party’s facilities and equipment \nwhich may reasonably be expected to impact the other Parties. Each Party shall provide \nadvance notice to the other Parties before undertaking any work on such circuits, \nespecially on electrical circuits involving circuit breaker trip and close contacts, current \ntransformers, or potential transformers. \n10.5 \nOperating and Maintenance Expenses. Subject to the provisions herein addressing the \nuse of facilities by others, and except for operations and maintenance expenses associated \nwith modifications made for providing interconnection or transmission service to a third \nparty and such third party pays for such expenses, the Large Load Interconnection \nCustomer shall be responsible for all reasonable expenses including overheads, \nassociated with: (1) owning, operating, maintaining, repairing, and replacing the Large \nLoad Interconnection Customer’s Interconnection Facilities; and (2) operation, \nmaintenance, repair, and replacement of the Participating TO’s Interconnection Facilities. \nArticle 11. Performance Obligation \n11.1 \nLarge Load Interconnection Customer’s Interconnection Facilities. The Large Load \nInterconnection Customer shall design, procure, construct, install, own and/or control the \nLarge Load Interconnection Customer’s Interconnection Facilities described in Appendix \nA and Appendix H at its sole expense. \n11.2 \nParticipating TO’s Interconnection Facilities. The Participating TO shall design, \nprocure, construct, install, own and/or control the Participating TO’s Interconnection \nFacilities described in Appendices A and H at the sole expense of the Large Load \nInterconnection Customer. Unless the Participating TO elects to fund the capital for the \nParticipating TO’s Interconnection Facilities, they shall be solely funded by the Large \nLoad Interconnection Customer. \n11.3 \nNetwork Upgrades and Distribution Upgrades. The Participating TO shall design, \nprocure, construct, install, and own the Network Upgrades and Distribution Upgrades \ndescribed in Appendix A and Appendix H.  The Large Load Interconnection Customer \nshall be responsible for all costs related to Distribution Upgrades. Network Upgrades \nshall be funded by the Large Load Interconnection Customer, and the Large Load \nInterconnection Customer shall bear the risk of, and be ultimately responsible for, the \ncosts incurred to provide the Interconnection Service requested, including the costs of \nNetwork Upgrades, in accordance with this Article 11.3."},{"page":263,"startToken":96846,"endToken":97319,"text":"31 \n11.3.1 Reimbursement for Network Upgrades.  The Large Load Interconnection \nCustomer shall be reimbursed in accordance with this Article 11.3.1 for amounts \npaid to the Participating TO for any Network Upgrade identified in Appendix A that \nhas a cost of $10,000,000 or more (each, a “Reimbursable Network Upgrade”). \nReimbursement for Reimbursable Network Upgrades placed in service on or before \nthe Commercial Operation Date of the Large Load Facility shall commence upon \nthe Commercial Operation Date. Reimbursement for each Reimbursable Network \nUpgrade placed in service after the Commercial Operation Date shall commence no \nlater ninety (90) Calendar Days after such Network Upgrade is placed in service (as \napplicable, the “Reimbursement Commencement Date”). Subject to this Article \n11.3, a reimbursement amount shall become fully and finally payable to the Large \nLoad Interconnection Customer only when (x) such Network Upgrades have \nachieved Commercial Operation, (y) the Large Load Facility has achieved \nCommercial Operation and (z) the Large Load Interconnection Customer is not in \nDefault under this LLIA (collectively, the “Final Payment Conditions”).  \nParticipating TO shall collect the cost of these facilities through its Transmission \nRevenue Requirement. \n11.3.2 Repayment of Amounts Advanced for Network Upgrades. \n11.3.2.1 \nRepayment Schedule. Any repayment amount provided pursuant \nto Article 11.3.1 shall include any tax gross-up or other tax-related \npayments associated with Network Upgrades not refunded to the \nLarge Load Interconnection Customer pursuant to Article 5 or \notherwise, and shall be paid to the Large Load Interconnection \nCustomer by the Participating TO on a dollar-for-dollar basis \neither through: (1) direct payments made on a levelized basis over \na period of years, which shall be not less than five (5) years nor \nmore than twenty (20) years, commencing on the applicable \nReimbursement Commencement Date (the “Repayment Period”); \nor (2) any alternative payment schedule that is mutually agreeable \nto the Large Load Interconnection Customer and Participating TO, \nprovided that such amount is paid within the Repayment Period, in \neach case subject to Article 11.3.2.4. The unpaid balance of any \nrepayment amount outstanding from time to time shall accrue \ninterest at the rate calculated in accordance with the methodology \nset forth in FERC’s regulations at 18 C.F.R. §35.19a(a)(2)(iii), and \nsuch interest shall be paid together with each installment. \nNotwithstanding the foregoing, if this LLIA terminates before the \nend of the applicable Repayment Period, the Participating TO’s \nobligation to pay refunds to the Large Load Interconnection \nCustomer shall cease as of the date of termination. \n11.3.2.2 \nInterest Payments and Assignment Rights. Any repayment shall \ninclude interest calculated in accordance with the methodology set \nforth in FERC’s regulations at 18 C.F.R. §35.19a(a)(2)(iii) from \nthe date of any payment for Network Upgrades through the date on"},{"page":264,"startToken":97319,"endToken":97717,"text":"32 \nwhich the Large Load Interconnection Customer receives a \nrepayment of such payment. Interest shall continue to accrue on \nthe repayment obligation so long as this LLIA is in effect. The \nLarge Load Interconnection Customer may assign such repayment \nrights to any entity. \n11.3.2.3 \nFailure to Achieve Commercial Operation. If the Large Load \nFacility fails to achieve Commercial Operation, but it or another \nLarge Load Facility is later constructed, achieves Commercial \nOperation and makes use of the Network Upgrades, the \nParticipating TO shall at that time reimburse Large Load \nInterconnection Customer for the amounts advanced for the \nNetwork Upgrades, provided that, notwithstanding Article \n11.3.2.2, interest on such reimbursement shall not incur interest \nfrom the time the Large Load Facility that paid for the Network \nUpgrades fails to achieve Commercial Operation and, in the \nParticipating TO’s reasonable discretion, will not be able to \nachieve Commercial Operation until the later Large Load Facility \nachieves Commercial Operation. Before any such reimbursement \ncan occur, the Large Load Interconnection Customer, or the entity \nthat ultimately constructs the Large Load Facility, if different, is \nresponsible for identifying and demonstrating to the Participating \nTO the appropriate entity to which reimbursement must be made in \norder to implement the intent of this reimbursement obligation. \n11.3.2.4 \nAccelerated Reimbursement Against Reimbursement Security. \nAs a condition precedent to receiving any Reimbursement, the \nLarge Load Interconnection Customer shall provide, and thereafter \nmaintain until released under this Article 11.3.2.4, credit support in \na form acceptable to Participating TO and from an issuer \nreasonably acceptable to the Participating TO (the \n“Reimbursement Security”) in an amount equal to: (i) initially, an \namount equal to the anticipated first Reimbursement payment \n(based on the amount of the Network Upgrades divided by the \nyears in the Repayment Period); and (ii) thereafter, the aggregate \namount of all Reimbursements received by the Large Load \nInterconnection Customer plus the amounts for the operation and \nmaintenance of the Network Upgrades to date, for a period of five \n(5) years from the Participating TO’s receipt of such \nReimbursement Security.  The Reimbursement Security shall \nsecure the Large Load Interconnection Customer’s obligation to \npay the Participating TO, within thirty (30) Calendar Days of \ninvoice, any amount by which Participating TO is not able to \ncollect relating to the full cost of a Reimbursable Network Upgrade \nin Participating TO’s Transmission Revenue Requirement"},{"page":265,"startToken":97717,"endToken":98149,"text":"33 \nIn addition, the Large Load Interconnection Customer may elect, \nby written notice to the Participating TO, to receive reimbursement \namounts for Reimbursable Network Upgrades for which it has \nmade payment before such amounts have become fully and finally \npayable under Article 11.3.1 and Article 11.3.2.1 (each such \npayment, an “Accelerated Reimbursement”).  In order to receive \nsuch Accelerated Reimbursement, the Large Load Interconnection \nCustomer shall post Reimbursement Security.  Prior to receipt of \neach additional Accelerated Reimbursement before the \nCommercial Operation Date, the Large Load Interconnection \nCustomer shall increase the Reimbursement Security by the \namount of such additional Accelerated Reimbursement, such that \nthe Reimbursement Security at all times through the Commercial \nOperation Date is not less than the cumulative Accelerated \nReimbursements received.   \n \nThe Participating TO shall pay each Reimbursement and \nAccelerated Reimbursement, as applicable, within thirty (30) \nCalendar Days after its receipt of the required Reimbursement \nSecurity, and no interest shall accrue under Article 11.3.2.1 or \nArticle 11.3.2.2 on any amount from and after the date it is paid.   \nIf (a) the Final Payment Conditions are not satisfied with respect to \nany portion of an Accelerated Reimbursement, or (b) this LLIA  \nterminates before any portion of an Accelerated Reimbursement \nhas become fully and finally payable, the Large Load \nInterconnection Customer shall repay such portion to the \nParticipating TO, together with interest calculated in accordance \nwith 18 C.F.R. §35.19a(a)(2)(iii) from the date of the Accelerated \nReimbursement, within thirty (30) Calendar Days of invoice. If the \nLarge Load Interconnection Customer fails to timely make any \nsuch repayment, or fails to renew or replace the Reimbursement \nSecurity at least thirty (30) Calendar Days before its expiration or \nto replenish it within five (5) Business Days after any draw, the \nParticipating TO may draw upon the Reimbursement Security in \nthe amount of the unpaid repayment obligation or, in the case of a \nfailure to renew, replace, or replenish, in the full amount of the \nthen-outstanding Reimbursements, and hold any cash proceeds as \nsecurity for such obligation. Any portion of an Accelerated \nReimbursement repaid or recovered by the Participating TO shall \nremain eligible for reimbursement in accordance with this Article \n11.3 when it becomes fully and finally payable. \n \n11.3.3 Special Provisions for Affected Systems. The Large Load Interconnection \nCustomer shall enter into an agreement with the owner of the Affected System \nand/or other affected owners of portions of the CAISO Controlled Grid, as \napplicable, in accordance with this Article 11.3.3. Such agreement shall specify the"},{"page":266,"startToken":98149,"endToken":98667,"text":"34 \nterms governing payments to be made by the Large Load Interconnection Customer \nto the owner of the Affected System and/or other affected owners of portions of the \nCAISO Controlled Grid as well as the repayment by the owner of the Affected \nSystem and/or other affected owners of portions of the CAISO Controlled Grid. In \nno event shall the Participating TO be responsible for the repayment for any \nfacilities that are not part of the Participating TO’s Transmission System. In the \nevent the Participating TO is a joint owner with an Affected System or with any \nother co-owner of a facility affected by the Large Load Facility, the Participating \nTO’s obligation to reimburse the Large Load Interconnection Customer for \npayments made to address the impacts of the Large Load Facility on the system \nshall not exceed the proportionate amount of the cost of any upgrades attributable to \nthe proportion of the jointly-owned facility owned by the Participating TO. \n11.4 \nProvision of Interconnection Financial Security. The Large Load Interconnection \nCustomer is obligated to provide all necessary Interconnection Financial Security \nrequired under Attachment 4 to the LLIP in a manner acceptable under Attachment 4. \nFailure by the Large Load Interconnection Customer to timely satisfy the terms and \nconditions set forth in Attachment 4 to the LLIP for the provision of Interconnection \nFinancial Security shall be deemed a Breach of this Agreement and a condition of Default \nof this Agreement. \n11.4.1 Notwithstanding any other provision of this Agreement for notice of Default and \nopportunity to cure such Default, the Participating TO shall provide the Large Load \nInterconnection Customer with written notice of any Default due to timely failure to \npost Interconnection Financial Security, and the Large Load Interconnection \nCustomer shall have five (5) Business Days from the date of such notice to cure \nsuch Default by posting the required Interconnection Financial Security. If the \nLarge Load Interconnection Customer fails to cure the Default, then this Agreement \nshall be deemed terminated. \nArticle 12. Invoice \n12.1 \nGeneral. The Participating TO shall submit to the Large Load Interconnection Customer, \non a monthly basis, invoices of amounts due pursuant to this LLIA for the preceding \nmonth. Each invoice shall state the month to which the invoice applies and fully describe \nthe services and equipment provided. The Parties may discharge mutual debts and \npayment obligations due and owing to each other on the same date through netting, in \nwhich case all amounts a Party owes to the other Party under this LLIA, including \ninterest payments or credits, shall be netted so that only the net amount remaining due \nshall be paid by the owing Party.   \n12.2 \nFinal Invoice. As soon as reasonably practicable, but within twelve (12) months after \ncompletion of the construction of the Participating TO’s Interconnection Facilities, \nNetwork Upgrades, and Distribution Upgrades, the Participating TO shall provide an \ninvoice of the final cost of the construction of the Participating TO’s Interconnection \nFacilities, Network Upgrades, and Distribution Upgrades, and shall set forth such costs in \nsufficient detail to enable the Large Load Interconnection Customer to compare the actual"},{"page":267,"startToken":98667,"endToken":99199,"text":"35 \ncosts with the estimates and to ascertain deviations, if any, from the cost estimates. With \nrespect to costs associated with the Participating TO’s Interconnection Facilities and \nDistribution Upgrades, the Participating TO shall refund to the Large Load \nInterconnection Customer any amount by which the actual payment by the Large Load \nInterconnection Customer for estimated costs exceeds the actual costs of construction \nwithin thirty (30) Calendar Days of the issuance of such final construction invoice; or, in \nthe event the actual costs of construction exceed the Large Load Interconnection \nCustomer’s actual payment for estimated costs, then the Large Load Interconnection \nCustomer shall pay to the Participating TO any amount by which the actual costs of \nconstruction exceed the actual payment by the Large Load Interconnection Customer for \nestimated costs within thirty (30) Calendar Days of the issuance of such final \nconstruction invoice. With respect to costs associated with Network Upgrades, the \nParticipating TO shall refund to the Large Load Interconnection Customer any amount by \nwhich the actual payment by the Large Load Interconnection Customer for estimated \ncosts exceeds the actual costs of construction multiplied by the Large Load \nInterconnection Customer’s percentage share of those costs, as set forth in Appendix G to \nthis LLIA within thirty (30) Calendar Days of the issuance of such final construction \ninvoice. In the event the actual costs of construction multiplied by the Large Load \nInterconnection Customer’s percentage share of those costs exceed the Large Load \nInterconnection Customer’s actual payment for estimated costs, then the Participating TO \nshall recover such difference through its transmission service rates. \n12.3 \nPayment. Invoices shall be rendered to the Large Load Interconnection Customer at the \naddress specified in Appendix F. The Large Load Interconnection Customer shall pay, or \nParticipating TO shall refund, the amounts due within thirty (30) Calendar Days of the \nLarge Load Interconnection Customer’s receipt of the invoice. All payments shall be \nmade in immediately available funds payable to the Large Load Interconnection \nCustomer or Participating TO, or by wire transfer to a bank named and account \ndesignated by the invoicing Large Load Interconnection Customer or Participating TO. \nPayment of invoices by any Party will not constitute a waiver of any rights or claims any \nParty may have under this LLIA. \n12.4 \nDisputes. In the event of a billing dispute between the Large Load Interconnection \nCustomer and the Participating TO, the Participating TO shall continue to provide \nInterconnection Service under this LLIA as long as the Large Load Interconnection \nCustomer: (i) continues to make all payments not in dispute; and (ii) pays to the \nParticipating TO or into an independent escrow account the portion of the invoice in \ndispute, pending resolution of such dispute. If the Large Load Interconnection Customer \nfails to meet these two requirements for continuation of service, then the Participating TO \nmay provide notice to the Large Load Interconnection Customer of a Default pursuant to \nArticle 17. Within thirty (30) Calendar Days after the resolution of the dispute, the Party \nthat owes money to the other Party shall pay the amount due with interest calculated in \naccordance with the methodology set forth in FERC’s Regulations at 18 C.F.R. § \n35.19a(a)(2)(iii)."},{"page":268,"startToken":99199,"endToken":99641,"text":"36 \nArticle 13. Emergencies \n13.1 \n[Reserved] \n13.2 \nObligations. Each Party shall comply with the Emergency Condition procedures of the \nCAISO, NERC, the Applicable Reliability Council, Applicable Reliability Standards, \nApplicable Laws and Regulations, Applicable Reliability Coordinators requirements, and \nany emergency procedures set forth in this LLIA or provided by the Participating TO. \n13.3 \nNotice. The Participating TO shall notify the Large Load Interconnection Customer \npromptly when it becomes aware of an Emergency Condition that affects the \nParticipating TO’s Interconnection Facilities or Distribution System or the CAISO \nControlled Grid, respectively, that may reasonably be expected to affect the Large Load \nInterconnection Customer’s operation of the Large Load Facility or the Large Load \nInterconnection Customer’s Interconnection Facilities. The Large Load Interconnection \nCustomer shall notify the Participating TO and, as applicable, the CAISO promptly when \nit becomes aware of an Emergency Condition that affects the Large Load Facility or the \nLarge Load Interconnection Customer’s Interconnection Facilities that may reasonably be \nexpected to affect the CAISO Controlled Grid or the Participating TO’s Interconnection \nFacilities. To the extent information is known, the notification shall describe the \nEmergency Condition, the extent of the damage or deficiency, the expected effect on the \noperation of the Large Load Interconnection Customer’s or Participating TO’s facilities \nand operations, its anticipated duration and the corrective action taken and/or to be taken. \nThe initial notice shall be followed as soon as practicable with written notice, if requested \nby a Party, which may be provided by electronic mail or facsimile. \n13.4 \nImmediate Action. Unless, in the Large Load Interconnection Customer’s reasonable \njudgment, immediate action is required, the Large Load Interconnection Customer shall \nobtain the consent of the Participating TO, such consent to not be unreasonably withheld, \nprior to performing any manual switching operations at the Large Load Facility or the \nLarge Load Interconnection Customer’s Interconnection Facilities in response to an \nEmergency Condition declared by the Participating TO in response to any other \nemergency condition. \n13.5 \nParticipating TO Authority. \n13.5.1 General. The Participating TO may take whatever actions or inactions, including \nissuance of dispatch instructions, with regard to Participating TO’s Interconnection \nFacilities or Distribution System they deem necessary during an Emergency \nCondition in order to: (i) preserve public health and safety; (ii) preserve the \nreliability of the Participating TO’s Transmission System and/or the Participating \nTO’s Interconnection Facilities or Distribution System; (iii) limit or prevent \ndamage; and (iv) expedite restoration of service. \nThe Participating TO shall use Reasonable Efforts to minimize the effect of such \nactions or inactions on the Large Load Facility or the Large Load Interconnection \nCustomer’s Interconnection Facilities. The Participating TO may, on the basis of"},{"page":269,"startToken":99641,"endToken":100123,"text":"37 \ntechnical considerations, require the Large Load Facility to mitigate an \nEmergency Condition by taking actions necessary and limited in scope to remedy \nthe Emergency Condition, including, but not limited to, directing the Large Load \nInterconnection Customer to shut-down, implementing a reduction or \ndisconnection pursuant to Article 13.5.2; or altering the outage schedules of the \nLarge Load Facility and the Large Load Interconnection Customer’s \nInterconnection Facilities.  \n13.5.2 Reduction and Disconnection. The Participating TO may reduce Interconnection \nService or disconnect the Large Load Facility or the Large Load Interconnection \nCustomer’s Interconnection Facilities when such reduction or disconnection is \nnecessary under Good Utility Practice due to Emergency Conditions and/or under \ncertain abnormal operating conditions to maintain the reliability of the transmission \nnetwork. When the Participating TO can schedule the reduction or disconnection in \nadvance, the Participating TO shall notify the Large Load Interconnection Customer \nof the reasons, timing and expected duration of the reduction or disconnection. The \nParticipating TO shall coordinate with the Large Load Interconnection Customer \nusing Good Utility Practice to schedule the reduction or disconnection during \nperiods of least impact to the Large Load Interconnection Customer and the \nParticipating TO. Any reduction or disconnection shall continue only for so long as \nreasonably necessary under Good Utility Practice. The Parties shall cooperate with \neach other to restore the Large Load Facility, the Interconnection Facilities, and the \nParticipating TO’s Transmission System to their normal operating state as soon as \npracticable consistent with Good Utility Practice. \n13.6 \nLarge Load Interconnection Customer Authority. Consistent with Good Utility \nPractice and this LLIA, the Large Load Interconnection Customer may take actions or \ninactions with regard to the Large Load Facility or the Large Load Interconnection \nCustomer’s Interconnection Facilities during an Emergency Condition in order to: (i) \npreserve public health and safety; (ii) preserve the reliability of the Large Load Facility or \nthe Large Load Interconnection Customer’s Interconnection Facilities; (iii) limit or \nprevent damage; and (iv) expedite restoration of service. Large Load Interconnection \nCustomer shall use Reasonable Efforts to minimize the effect of such actions or inactions \non the Participating TO’s Transmission System and the Participating TO’s \nInterconnection Facilities. The Participating TO shall use Reasonable Efforts to assist \nLarge Load Interconnection Customer in such actions. \n13.7 \nLimited Liability. Except as otherwise provided in this LLIA, no Party shall be liable to \nany other Party for any action it takes in responding to an Emergency Condition so long \nas such action is made in good faith and is consistent with Good Utility Practice. \nArticle 14. Regulatory Requirements and Governing Laws \n14.1 \nRegulatory Requirements. Each Party’s obligations under this LLIA shall be subject to \nits receipt of any required approval or certificate from one or more Governmental \nAuthorities in the form and substance satisfactory to the applying Party, or the Party \nmaking any required filings with, or providing notice to, such Governmental Authority,"},{"page":270,"startToken":100123,"endToken":100572,"text":"38 \nand the expiration of any time period associated therewith. Each Party shall in good faith \nseek and use its Reasonable Efforts to obtain such other approvals. Nothing in this LLIA \nshall require the Large Load Interconnection Customer to take any action that could \nresult in its inability to obtain, or its loss of, status or exemption under the Federal Power \nAct or the Public Utility Holding Company Act of 1935, as amended, or the Public \nUtility Regulatory Policies Act of 1978, or the Energy Policy Act of 2005. \n14.2 \nGoverning Law. \n14.2.1 The validity, interpretation and performance of this LLIA and each of its provisions \nshall be governed by the laws of the state where the Point of Interconnection is \nlocated, without regard to its conflicts of law principles. \n14.2.2 This LLIA is subject to all Applicable Laws and Regulations. \n14.2.3 Each Party expressly reserves the right to seek changes in, appeal, or otherwise \ncontest any laws, orders, rules, or regulations of a Governmental Authority. \nArticle 15. Notices \n15.1 \nGeneral. Unless otherwise provided in this LLIA, any notice, demand or request required \nor permitted to be given by a Party to another and any instrument required or permitted to \nbe tendered or delivered by a Party in writing to another shall be effective when delivered \nand may be so given, tendered or delivered, by recognized national courier, conveyed by \ne-mail, or by depositing the same with the United States Postal Service with postage \nprepaid, for delivery by certified or registered mail, addressed to the Party, or personally \ndelivered to the Party, at the address set out in Appendix F, Addresses for Delivery of \nNotices and Billings. \nA Party must update the information in Appendix F as information changes. A Party may \nchange the notice information in this LLIA by giving five (5) Business Days written \nnotice prior to the effective date of the change. Such changes shall not constitute an \namendment to this LLIA. \n15.2 \nBillings and Payments. Billings and payments shall be sent to the addresses set out in \nAppendix F. \n15.3 \nAlternative Forms of Notice. Any notice or request required or permitted to be given by \na Party to another and not required by this LLIA to be given as provided in Article 15.1 \nmay be so given by telephone, or e-mail to the telephone numbers and e-mail addresses \nset out in Appendix F. \n15.4 \nOperations and Maintenance Notice. Each Party shall notify the other Parties in writing \nof the identity of the person(s) that it designates as the point(s) of contact with respect to \nthe implementation of Articles 9 and 10."},{"page":271,"startToken":100572,"endToken":101047,"text":"39 \nArticle 16. Force Majeure \n16.1 \nForce Majeure. \n16.1.1 Economic hardship is not considered a Force Majeure event. \n16.1.2 No Party shall be considered to be in Default with respect to any obligation \nhereunder, (including obligations under Article 4), other than the obligation to pay \nmoney when due, if prevented from fulfilling such obligation by Force Majeure. A \nParty unable to fulfill any obligation hereunder (other than an obligation to pay \nmoney when due) by reason of Force Majeure shall give notice and the full \nparticulars of such Force Majeure to the other Party in writing or by telephone as \nsoon as reasonably possible after the occurrence of the cause relied upon. \nTelephone notices given pursuant to this Article shall be confirmed in writing as \nsoon as reasonably possible and shall specifically state full particulars of the Force \nMajeure, the time and date when the Force Majeure occurred and when the Force \nMajeure is reasonably expected to cease. The Party affected shall exercise due \ndiligence to remove such disability with reasonable dispatch, but shall not be \nrequired to accede or agree to any provision not satisfactory to it to settle and \nterminate a strike or other labor disturbance. \nArticle 17. Default \n17.1 \nDefault. \n17.1.1 General. No Default shall exist where such failure to discharge an obligation (other \nthan the payment of money) is the result of Force Majeure as defined in this LLIA \nor the result of an act or omission of the other Party. Upon a Breach, the affected \nnon-Breaching Party(ies) shall give written notice of such Breach to the Breaching \nParty. Except as otherwise provided herein, the Breaching Party shall have thirty \n(30) Calendar Days from receipt of the Default notice within which to cure such \nBreach; provided however, if such Breach is not capable of cure within thirty (30) \nCalendar Days, the Breaching Party shall commence such cure within thirty (30) \nCalendar Days after notice and continuously and diligently complete such cure \nwithin ninety (90) Calendar Days from receipt of the Default notice; and, if cured \nwithin such time, the Breach specified in such notice shall cease to exist. \n17.1.2 Right to Terminate. If a Breach is not cured as provided in this Article, or if a \nBreach is not capable of being cured within the period provided for herein, the \naffected non-Breaching Party(ies) shall have the right to declare a Default and \nterminate this LLIA by written notice at any time until cure occurs, and be relieved \nof any further obligation hereunder and, whether or not such Party(ies) terminates \nthis LLIA, to recover from the Breaching Party all amounts due hereunder, plus all \nother damages and remedies to which it is entitled at law or in equity. The \nprovisions of this Article will survive termination of this LLIA."},{"page":272,"startToken":101047,"endToken":101547,"text":"40 \nArticle 18. Indemnity, Consequential Damages, and Insurance \n18.1 \nIndemnity. Each Party (the “Indemnifying Party”) shall at all times indemnify, defend, \nand hold the other Parties (“Indemnified Party”) harmless from, any and all Losses \narising out of or resulting from another Party’s action or inactions of its obligations under \nthis LLIA on behalf of the indemnifying Party, except in cases of gross negligence or \nintentional wrongdoing by the Indemnified Party. \n18.1.1 Indemnified Party. If an Indemnified Party is entitled to indemnification under this \nArticle 18 as a result of a claim by a third party, and the Indemnifying Party fails, \nafter notice and reasonable opportunity to proceed under Article 18.1, to assume the \ndefense of such claim, such Indemnified Party may at the expense of the \nIndemnifying Party contest, settle or consent to the entry of any judgment with \nrespect to, or pay in full, such claim. \n18.1.2 Indemnifying Party. If an Indemnifying Party is obligated to indemnify and hold \nany Indemnified Party harmless under this Article 18, the amount owing to the \nIndemnified Party shall be the amount of such Indemnified Party’s actual Loss, net \nof any insurance or other recovery. \n18.1.3 Indemnity Procedures. Promptly after receipt by an Indemnified Party of any \nclaim or notice of the commencement of any action or administrative or legal \nproceeding or investigation as to which the indemnity provided for in Article 18.1 \nmay apply, the Indemnified Party shall notify the Indemnifying Party of such fact. \nAny failure of or delay in such notification shall not affect a Party’s indemnification \nobligation unless such failure or delay is materially prejudicial to the indemnifying \nParty. \nThe Indemnifying Party shall have the right to assume the defense thereof with \ncounsel designated by such Indemnifying Party and reasonably satisfactory to the \nIndemnified Party. If the defendants in any such action include one or more \nIndemnified Parties and the Indemnifying Party and if the Indemnified Party \nreasonably concludes that there may be legal defenses available to it and/or other \nIndemnified Parties which are different from or additional to those available to the \nIndemnifying Party, the Indemnified Party shall have the right to select separate \ncounsel to assert such legal defenses and to otherwise participate in the defense of \nsuch action on its own behalf. In such instances, the Indemnifying Party shall only \nbe required to pay the fees and expenses of one additional attorney to represent an \nIndemnified Party or Indemnified Parties having such differing or additional legal \ndefenses. \nThe Indemnified Party shall be entitled, at its expense, to participate in any such \naction, suit or proceeding, the defense of which has been assumed by the \nIndemnifying Party. Notwithstanding the foregoing, the Indemnifying Party: (i) \nshall not be entitled to assume and control the defense of any such action, suit or \nproceedings if and to the extent that, in the opinion of the Indemnified Party and \nits counsel, such action, suit or proceeding involves the potential imposition of"},{"page":273,"startToken":101547,"endToken":102080,"text":"41 \ncriminal liability on the Indemnified Party, or there exists a conflict or adversity \nof interest between the Indemnified Party and the Indemnifying Party, in such \nevent the Indemnifying Party shall pay the reasonable expenses of the \nIndemnified Party; and (ii) shall not settle or consent to the entry of any judgment \nin any action, suit or proceeding without the consent of the Indemnified Party, \nwhich shall not be unreasonably withheld, conditioned or delayed. \n18.2 \nConsequential Damages. Other than the liquidated damages heretofore described in \nArticle 5.2, in no event shall any Party be liable under any provision of this LLIA for any \nlosses, damages, costs or expenses for any special, indirect, incidental, consequential, or \npunitive damages, including but not limited to loss of profit or revenue, loss of the use of \nequipment, cost of capital, cost of temporary equipment or services, whether based in \nwhole or in part in contract, in tort, including negligence, strict liability, or any other \ntheory of liability; provided, however, that damages for which a Party may be liable to \nanother Party under another agreement will not be considered to be special, indirect, \nincidental, or consequential damages hereunder. \n18.3 \nInsurance. As indicated below, the designated Party shall, at its own expense, maintain \nin force throughout the periods noted in this LLIA, and until released by the other Parties, \nthe following minimum insurance coverages, with insurers rated no less than A- (with a \nminimum size rating of VII) by Bests’ Insurance Guide and Key Ratings and authorized \nto do business in the state where the Point of Interconnection is located, except in the \ncase of any insurance required to be carried by the CAISO, the State of California: \n18.3.1 Workers’ Compensation Insurance and Employers’ Liability. The Participating \nTO and the Large Load Interconnection Customer shall maintain such coverage \nfrom the commencement of any construction activities providing statutory benefits \nfor Workers Compensation coverage and coverage amounts of no less than One \nMillion Dollars ($1,000,000) for employer’s liability for each employee for bodily \ninjury by accident and One Million Dollars ($1,000,000) for each employee for \nbodily injury by disease in accordance with the laws and regulations of the state in \nwhich the Point of Interconnection is located. The Participating TO shall provide \nthe Large Load Interconnection Customer with evidence of such insurance coverage \nwithin thirty (30) Calendar Days of any request by the Large Load Interconnection \nCustomer. The Large Load Interconnection Customer shall provide evidence of \nsuch insurance thirty (30) Calendar Days prior to entry by any employee or \ncontractor or other person acting on the Large Load Interconnection Customer’s \nbehalf onto any construction site to perform any work related to the Interconnection \nFacilities or Large Load Facility. \n18.3.2 Commercial General Liability Insurance. The Participating TO and the Large \nLoad Interconnection Customer shall maintain commercial general liability \ninsurance coverage commencing within thirty (30) Calendar Days of the Effective \nDate of this LLIA, including coverage for premises and operations, bodily injury \n(including death), personal injury, property damage, products and completed \noperations coverage, coverage for explosion, collapse and underground hazards, \nindependent contractors coverage, and (i) liability of Participating TO and the Large"},{"page":274,"startToken":102080,"endToken":102597,"text":"42 \nLoad Interconnection Customer that would be imposed without the LLIA, or (ii) \nliability assumed by the Participating TO and the Large Load Interconnection \nCustomer in a contract or agreement that is an “insured contract” under commercial \ngeneral liability insurance policy. Such insurance shall include no cross-liability \nexclusions or separation of insured clause endorsement exclusions, with minimum \nlimits of One Million Dollars ($1,000,000) per occurrence/One Million Dollars \n($1,000,000) aggregate. If the activities of the Large Load Interconnection \nCustomer are being conducted through the actions of an Affiliate, then the Large \nLoad Interconnection Customer may satisfy the insurance requirements of this \nArticle 18.3.2 by providing evidence of insurance coverage carried by such Affiliate \nand showing the Participating TO and, as applicable, the CAISO as an additional \ninsured only with respect to the LLIA, together with the Large Load \nInterconnection Customer’s written representation to the Participating TO and, as \napplicable, the CAISO that the insured Affiliate is conducting all of the necessary \npre-construction work. Within thirty (30) Calendar Days prior to the entry of any \nperson on behalf of the Large Load Interconnection Customer onto any construction \nsite to perform work related to the Interconnection Facilities or Large Load Facility, \nthe Large Load Interconnection Customer shall replace any evidence of affiliate \ninsurance with evidence of such insurance carried by the Large Load \nInterconnection Customer, naming the Participating TO and, as applicable, the \nCAISO as additional insured only with respect to the LLIA. \n18.3.3 Business Automobile Liability Insurance. Prior to the entry of any such vehicles \non any construction site in connection with work done by or on behalf of the Large \nLoad Interconnection Customer, the Large Load Interconnection Customer shall \nprovide evidence of coverage of owned and non-owned and hired vehicles, trailers \nor semi-trailers designed for travel on public roads, with a minimum, combined \nsingle limit of One Million Dollars ($1,000,000) per occurrence for bodily injury, \nincluding death, and property damage. The Large Load Interconnection Customer \nshall include the Participating TO and, as applicable, the CAISO as additional \ninsured with respect to the LLIA on any such policies. \n18.3.4 Excess Liability Insurance. Commencing at the time of entry of any person on its \nbehalf upon any construction site for the Network Upgrades, Interconnection \nFacilities, or Large Load Facility, the Participating TO and the Large Load \nInterconnection Customer shall maintain Excess Liability insurance over and above \nthe Employer’s Liability Commercial General Liability and Business Automobile \nLiability Insurance coverage, with a minimum limit of Twenty Million Dollars \n($20,000,000) per occurrence/Twenty Million Dollars ($20,000,000) aggregate. \nSuch insurance carried by the Participating TO shall include the Large Load \nInterconnection Customer and, as applicable, the CAISO as additional insured with \nrespect to the LLIA, and such insurance carried by the Large Load Interconnection \nCustomer shall include the Participating TO and, as applicable, the CAISO as an \nadditional insured with respect to the LLIA. The requirements of Articles 18.3.2 \nand 18.3.4 may be met by any combination of general and excess liability \ninsurance."},{"page":275,"startToken":102597,"endToken":103078,"text":"43 \n18.3.5 The Commercial General Liability Insurance, Business Automobile Liability \nInsurance and Excess Liability Insurance policies shall include the other Parties \nidentified in the articles above, their parents, their subsidiaries, respective directors, \nofficers, agents, servants and employees (“Other Party Group”) and, as applicable, \nthe CAISO as additional insured. All policies shall contain provisions whereby the \ninsurers waive all rights of subrogation in accordance with the provisions of this \nLLIA against the Other Party Group. If any Party can reasonably demonstrate that \ncoverage policies containing provisions for insurer waiver of subrogation rights, or \nadvance notice are not commercially available, then the Parties shall meet and \nconfer and mutually determine to: (i) establish replacement or equivalent terms in \nlieu of subrogation or notice; or (ii) waive the requirements that coverage(s) include \nsuch subrogation provision or require advance written notice from such insurers. \n18.3.6 The Commercial General Liability Insurance, Business Automobile Liability \nInsurance and Excess Liability Insurance policies shall contain provisions that \nspecify that the policies are primary and non-contributory. Each Party shall be \nresponsible for its respective deductibles or self-insured retentions. \n18.3.7 The Commercial General Liability Insurance, Business Automobile Liability \nInsurance and Excess Liability Insurance policies, if written on a claims first made \nbasis, shall be maintained in full force and effect for two (2) years after termination \nof this LLIA, which coverage may be in the form of extended reporting period \ncoverage if agreed by the Parties. \n18.3.8 [Not Used.] \n18.3.9 Thirty (30) Calendar Days prior to the start of any work at the construction site \nrelated to Interconnection Facilities or Large Load Facility under this LLIA, and as \nsoon as practicable after the end of each fiscal year or at the renewal of the \ninsurance policy and in any event within ninety (90) Calendar Days thereafter, the \nParticipating TO and the Large Load Interconnection Customer shall provide a \ncertificate of insurance for all insurance required in this LLIA, executed by each \ninsurer or by an authorized representative of each insurer. \n18.3.10 Notwithstanding the foregoing, each Party may self-insure: \n(a) \nto meet the minimum insurance requirements of Article 18.3.1, to the extent that it \nmaintains a self-insurance program that is a qualified self-insurer within the state \nin which the Point of Interconnection is located, under the laws and regulations of \nsuch state; and \n(b) \nto meet the minimum insurance requirements of Articles 18.3.2 through 18.3.8 to \nthe extent it maintains a self-insurance program; provided that, such Party’s senior \nunsecured debt or issuer rating is BBB-, or better, as rated by Standard & Poor’s \nand that its self-insurance program meets the minimum insurance requirements of \nArticles 18.3.2 through 18.3.8. For any period of time that a Party’s senior \nunsecured debt rating and issuer rating are both unrated by Standard & Poor’s or"},{"page":276,"startToken":103078,"endToken":103549,"text":"44 \nare both rated at less than BBB- by Standard & Poor’s, such Party shall comply \nwith the insurance requirements applicable to it under Articles 18.3.2 through \n18.3.9. \n(c) \nin the event that a Party is permitted to self-insure pursuant to this Article 18.3.10, \nit shall notify the other Parties that it meets the requirements to self-insure and \nthat its self-insurance program meets the minimum insurance requirements in a \nmanner consistent with that specified in Article 18.3.9. \n18.3.11The Parties agree to report to each other in writing as soon as practical all accidents \nor occurrences resulting in injuries to any person, including death, and any property \ndamage greater than $25,000, including within the scope of coverage of such \ninsurance whether or not such coverage is sought. \nArticle 19. Assignment \n19.1 \nAssignment. This LLIA may be assigned by a Party only with the written consent of the \nother Parties; provided that a Party may assign this LLIA without the consent of the other \nParties to any Affiliate of the assigning Party with an equal or greater credit rating and \nwith the legal authority and operational ability to satisfy the obligations of the assigning \nParty under this LLIA; and provided further that the Large Load Interconnection \nCustomer shall have the right to assign this LLIA, without the consent of the \nParticipating TO for collateral security purposes to aid in providing financing for the \nLarge Load Facility, provided that the Large Load Interconnection Customer will \npromptly notify the Participating TO of any such assignment. Any financing arrangement \nentered into by the Large Load Interconnection Customer pursuant to this Article will \nprovide that prior to or upon the exercise of the secured party’s, trustee’s or mortgagee’s \nassignment rights pursuant to said arrangement, the secured creditor, the trustee or \nmortgagee will notify the Participating TO of the date and particulars of any such \nexercise of assignment right(s), including providing the Participating TO, with proof that \nit meets the requirements of Articles 11.3 and 18.3. Any attempted assignment that \nviolates this Article is void and ineffective. Any assignment under this LLIA shall not \nrelieve a Party of its obligations, nor shall a Party’s obligations be enlarged, in whole or \nin part, by reason thereof. Where required, consent to assignment will not be \nunreasonably withheld, conditioned or delayed. \nArticle 20. Severability \n20.1 \nSeverability. If any provision in this LLIA is finally determined to be invalid, void or \nunenforceable by any court or other Governmental Authority having jurisdiction, such \ndetermination shall not invalidate, void or make unenforceable any other provision, \nagreement or covenant of this LLIA. \nArticle 21. Comparability \n21.1 \nComparability. The Parties will comply with all applicable comparability and code of \nconduct laws, rules and regulations, as amended from time to time."},{"page":277,"startToken":103549,"endToken":104049,"text":"45 \nArticle 22. Confidentiality \n22.1 \nConfidentiality. Confidential Information shall include, without limitation, all \ninformation relating to a Party’s technology, research and development, business affairs, \nand pricing, and any information supplied by any of the Parties to the other Parties prior \nto the execution of this LLIA. \nInformation is Confidential Information only if it is clearly designated or marked in \nwriting as confidential on the face of the document, or, if the information is conveyed \norally or by inspection, if the Party providing the information orally informs the Parties \nreceiving the information that the information is confidential. \nIf requested by any Party, the other Parties shall provide in writing the basis for asserting \nthat the information referred to in this Article 22 warrants confidential treatment, and the \nrequesting Party may disclose such writing to the appropriate Governmental Authority. \nEach Party shall be responsible for the costs associated with affording confidential \ntreatment to its information. \n22.1.1 Term. During the term of this LLIA, and for a period of three (3) years after the \nexpiration or termination of this LLIA, except as otherwise provided in this Article \n22, each Party shall hold in confidence and shall not disclose to any person \nConfidential Information. \n22.1.2 Scope. Confidential Information shall not include information that the receiving \nParty can demonstrate: (1) is generally available to the public other than as a result \nof a disclosure by the receiving Party; (2) was in the lawful possession of the \nreceiving Party on a non-confidential basis before receiving it from the disclosing \nParty; (3) was supplied to the receiving Party without restriction by a third party, \nwho, to the knowledge of the receiving Party after due inquiry, was under no \nobligation to the disclosing Party to keep such information confidential; (4) was \nindependently developed by the receiving Party without reference to Confidential \nInformation of the disclosing Party; (5) is, or becomes, publicly known, through no \nwrongful act or omission of the receiving Party or Breach of this LLIA; or (6) is \nrequired, in accordance with Article 22.1.7 of this LLIA, Order of Disclosure, to be \ndisclosed by any Governmental Authority or is otherwise required to be disclosed \nby law or subpoena, or is necessary in any legal proceeding establishing rights and \nobligations under this LLIA. Information designated as Confidential Information \nwill no longer be deemed confidential if the Party that designated the information as \nconfidential notifies the other Parties that it no longer is confidential. \n22.1.3 Release of Confidential Information. No Party shall release or disclose \nConfidential Information to any other person, except to its employees, consultants, \nAffiliates (limited by the Standards of Conduct requirements set forth in Part 358 of \nFERC’s Regulations, 18 C.F.R. 358), subcontractors, or to parties who may be or \nconsidering providing financing to or equity participation with the Large Load \nInterconnection Customer, or to potential purchasers or assignees of the Large Load \nInterconnection Customer, on a need-to-know basis in connection with this LLIA,"},{"page":278,"startToken":104049,"endToken":104540,"text":"46 \nunless such person has first been advised of the confidentiality provisions of this \nArticle 22 and has agreed to comply with such provisions. Notwithstanding the \nforegoing, a Party providing Confidential Information to any person shall remain \nprimarily responsible for any release of Confidential Information in contravention \nof this Article 22. \n22.1.4 Rights. Each Party retains all rights, title, and interest in the Confidential \nInformation that each Party discloses to the other Parties. The disclosure by each \nParty to the other Parties of Confidential Information shall not be deemed a waiver \nby a Party or any other person or entity of the right to protect the Confidential \nInformation from public disclosure. \n22.1.5 No Warranties. The mere fact that a Party has provided Confidential Information \ndoes not constitute a warranty or representation as to its accuracy or completeness. \nIn addition, by supplying Confidential Information, no Party obligates itself to \nprovide any particular information or Confidential Information to the other Parties \nnor to enter into any further agreements or proceed with any other relationship or \njoint venture. \n22.1.6 Standard of Care. Each Party shall use at least the same standard of care to protect \nConfidential Information it receives as it uses to protect its own Confidential \nInformation from unauthorized disclosure, publication or dissemination. Each Party \nmay use Confidential Information solely to fulfill its obligations to the other Parties \nunder this LLIA or its regulatory requirements. \n22.1.7 Order of Disclosure. If a court or a Governmental Authority or entity with the \nright, power, and apparent authority to do so requests or requires any Party, by \nsubpoena, oral deposition, interrogatories, requests for production of documents, \nadministrative order, or otherwise, to disclose Confidential Information, that Party \nshall provide the other Parties with prompt notice of such request(s) or \nrequirement(s) so that the other Parties may seek an appropriate protective order or \nwaive compliance with the terms of this LLIA. Notwithstanding the absence of a \nprotective order or waiver, the Party may disclose such Confidential Information \nwhich, in the opinion of its counsel, the Party is legally compelled to disclose. Each \nParty will use Reasonable Efforts to obtain reliable assurance that confidential \ntreatment will be accorded any Confidential Information so furnished. \n22.1.8 Termination of Agreement. Upon termination of this LLIA for any reason, each \nParty shall, within ten (10) Calendar Days of receipt of a written request from \nanother Party, use Reasonable Efforts to destroy, erase, or delete (with such \ndestruction, erasure, and deletion certified in writing to the other Party) or return to \nthe other Party, without retaining copies thereof, any and all written or electronic \nConfidential Information received from the other Party. \n22.1.9 Remedies. The Parties agree that monetary damages would be inadequate to \ncompensate a Party for another Party’s Breach of its obligations under this Article \n22. Each Party accordingly agrees that the other Parties shall be entitled to equitable"},{"page":279,"startToken":104540,"endToken":105121,"text":"47 \nrelief, by way of injunction or otherwise, if the first Party Breaches or threatens to \nBreach its obligations under this Article 22, which equitable relief shall be granted \nwithout bond or proof of damages, and the receiving Party shall not plead in \ndefense that there would be an adequate remedy at law. Such remedy shall not be \ndeemed an exclusive remedy for the Breach of this Article 22 but shall be in \naddition to all other remedies available at law or in equity. The Parties further \nacknowledge and agree that the covenants contained herein are necessary for the \nprotection of legitimate business interests and are reasonable in scope. No Party, \nhowever, shall be liable for indirect, incidental, or consequential or punitive \ndamages of any nature or kind resulting from or arising in connection with this \nArticle 22. \n22.1.10 Disclosure to FERC, its Staff, or a State. Notwithstanding anything in this \nArticle 22 to the contrary, and pursuant to 18 C.F.R. section 1b.20, if FERC or its \nstaff, during the course of an investigation or otherwise, requests information from \none of the Parties that is otherwise required to be maintained in confidence pursuant \nto this LLIA, the Party shall provide the requested information to FERC or its staff, \nwithin the time provided for in the request for information. In providing the \ninformation to FERC or its staff, the Party must, consistent with 18 C.F.R. section \n388.112, request that the information be treated as confidential and non-public by \nFERC and its staff and that the information be withheld from public disclosure. \nParties are prohibited from notifying the other Parties to this LLIA prior to the \nrelease of the Confidential Information to FERC or its staff. The Party shall notify \nthe other Parties to the LLIA when it is notified by FERC or its staff that a request \nto release Confidential Information has been received by FERC, at which time any \nof the Parties may respond before such information would be made public, pursuant \nto 18 C.F.R. section 388.112. Requests from a state regulatory body conducting a \nconfidential investigation shall be treated in a similar manner if consistent with the \napplicable state rules and regulations. \n22.1.11 Subject to the exception in Article 22.1.10, Confidential Information shall not be \ndisclosed by the other Parties to any person not employed or retained by the other \nParties, except to the extent disclosure is: (i) required by law; (ii) reasonably \ndeemed by the disclosing Party to be required to be disclosed in connection with a \ndispute between or among the Parties, or the defense of litigation or dispute; (iii) \notherwise permitted by consent of the other Parties, such consent not to be \nunreasonably withheld; or (iv) necessary to fulfill its obligations under this LLIA or \nas a transmission service provider or a Balancing Authority including disclosing the \nConfidential Information to a Regional Transmission Organization or Independent \nSystem Operator or to a regional or national reliability organization. The Party \nasserting confidentiality shall notify the other Parties in writing of the information it \nclaims is confidential. Prior to any disclosures of another Party’s Confidential \nInformation under this subparagraph, or if any third party or Governmental \nAuthority makes any request or demand for any of the information described in this \nsubparagraph, the disclosing Party agrees to promptly notify the other Party in \nwriting and agrees to assert confidentiality and cooperate with the other Party in"},{"page":280,"startToken":105121,"endToken":105594,"text":"48 \nseeking to protect the Confidential Information from public disclosure by \nconfidentiality agreement, protective order or other reasonable measures. \nArticle 23. Environmental Releases \n23.1 \nEach Party shall notify the other Parties, first orally and then in writing, of the release of \nany Hazardous Substances, any asbestos or lead abatement activities, or any type of \nremediation activities related to the Large Load Facility or the Interconnection Facilities, \neach of which may reasonably be expected to affect the other Parties. The notifying Party \nshall: (i) provide the notice as soon as practicable, provided such Party makes a good \nfaith effort to provide the notice no later than twenty-four (24) hours after such Party \nbecomes aware of the occurrence; and (ii) promptly furnish to the other Parties copies of \nany publicly available reports filed with any Governmental Authorities addressing such \nevents. \nArticle 24. Information Requirements \n24.1 \nInformation Acquisition. The Participating TO and the Large Load Interconnection \nCustomer shall submit specific information regarding the electrical characteristics of their \nrespective facilities to each other as described below and in accordance with Applicable \nReliability Standards. \n24.2 \nInformation Submission by Participating TO. The initial information submission by \nthe Participating TO shall occur no later than one hundred eighty (180) Calendar Days \nprior to Trial Operation and shall include the Participating TO’s Transmission System \ninformation necessary to allow the Large Load Interconnection Customer to select \nequipment and meet any system protection and stability requirements, unless otherwise \nagreed to by the Participating TO and the Large Load Interconnection Customer. On a \nmonthly basis the Participating TO shall provide the Large Load Interconnection \nCustomer and, as applicable, the CAISO a status report on the construction and \ninstallation of the Participating TO’s Interconnection Facilities and Network Upgrades, \nincluding, but not limited to, the following information: (1) progress to date; (2) a \ndescription of the activities since the last report; (3) a description of the action items for \nthe next period; and (4) the delivery status of equipment ordered. \nArticle 25. Information Access and Audit Rights \n25.1 \nInformation Access. Each Party (the “disclosing Party”) shall make available to the \nother Party information that is in the possession of the disclosing Party and is necessary \nin order for the other Party to: (i) verify the costs incurred by the disclosing Party for \nwhich the other Party is responsible under this LLIA; and (ii) carry out its obligations and \nresponsibilities under this LLIA. The Parties shall not use such information for purposes \nother than those set forth in this Article 25.1 and to enforce their rights under this LLIA. \nNothing in this Article 25 shall obligate the Participating TO to make available to a Party \nany third-party information in its possession or control. if making such third-party \ninformation available would violate Participating TO’s obligations the use or disclosure \nof such third-party information."},{"page":281,"startToken":105594,"endToken":106121,"text":"49 \n25.2 \nReporting of Non-Force Majeure Events. Each Party (the “notifying Party”) shall \nnotify the other Parties when the notifying Party becomes aware of its inability to comply \nwith the provisions of this LLIA for a reason other than a Force Majeure event. The \nParties agree to cooperate with each other and provide necessary information regarding \nsuch inability to comply, including the date, duration, reason for the inability to comply, \nand corrective actions taken or planned to be taken with respect to such inability to \ncomply. Notwithstanding the foregoing, notification, cooperation or information provided \nunder this Article shall not entitle the Party receiving such notification to allege a cause \nfor anticipatory breach of this LLIA. \n25.3 \nAudit Rights. Subject to the requirements of confidentiality under Article 22 of this \nLLIA, the Parties’ audit rights shall include audits of a Party’s costs pertaining to such \nParty’s performance or satisfaction of obligations owed to the other Party under this \nLLIA, calculation of invoiced amounts and each such Party’s actions in an Emergency \nCondition. The Large Load Interconnection Customer and the Participating TO shall each \nhave the right, during normal business hours, and upon prior reasonable notice to the \nother Party, to audit at its own expense the other Party’s accounts and records pertaining \nto either such Party’s performance or either such Party’s satisfaction of obligations owed \nto the other Party under this LLIA.  Any audit authorized by this Article shall be \nperformed at the offices where such accounts and records are maintained and shall be \nlimited to those portions of such accounts and records that relate to each such Party’s \nperformance and satisfaction of obligations under this LLIA. Each such Party shall keep \nsuch accounts and records for a period equivalent to the audit rights periods described in \nArticle 25.4. \n25.4 \nAudit Rights Periods. \n25.4.1 Audit Rights Period for Construction-Related Accounts and Records. Accounts \nand records related to the design, engineering, procurement, and construction of \nParticipating TO’s Interconnection Facilities, Network Upgrades, and Distribution \nUpgrades constructed by the Participating TO shall be subject to audit for a period \nof twenty-four (24) months following the Participating TO’s issuance of a final \ninvoice in accordance with Article 12.2. Accounts and records related to the design, \nengineering, procurement, and construction of Participating TO’s Interconnection \nFacilities constructed by the Large Load Interconnection Customer shall be subject \nto audit and verification by the Participating TO for a period of twenty-four (24) \nmonths following the Large Load Interconnection Customer’s issuance of a final \ninvoice. \n25.4.2 Audit Rights Period for All Other Accounts and Records. Accounts and records \nrelated to a Party’s performance or satisfaction of all obligations under this LLIA \nother than those described in Article 25.4.1 shall be subject to audit as follows: (i) \nfor an audit relating to cost obligations, the applicable audit rights period shall be \ntwenty-four (24) months after the auditing Party’s receipt of an invoice giving rise \nto such cost obligations; and (ii) for an audit relating to all other obligations, the \napplicable audit rights period shall be twenty-four (24) months after the event for \nwhich the audit is sought."},{"page":282,"startToken":106121,"endToken":106640,"text":"50 \n25.5 \nAudit Results. If an audit by the Large Load Interconnection Customer or the \nParticipating TO determines that an overpayment or an underpayment has occurred with \nrespect to the other Party, a notice of such overpayment or underpayment shall be given \nto the other Party together with those records from the audit which supports such \ndetermination. The Party that is owed payment shall render an invoice to the other Party \nand such invoice shall be paid pursuant to Article 12 hereof. \nArticle 26. Subcontractors \n26.1 \nGeneral. Nothing in this LLIA shall prevent a Party from utilizing the services of any \nsubcontractor as it deems appropriate to perform its obligations under this LLIA; \nprovided, however, that each Party shall require its subcontractors to comply with all \napplicable terms and conditions of this LLIA in providing such services and each Party \nshall remain primarily liable to the other Party for the performance of such subcontractor. \n26.2 \nResponsibility of Principal. The creation of any subcontract relationship shall not \nrelieve the hiring Party of any of its obligations under this LLIA. The hiring Party shall \nbe fully responsible to the other Parties for the acts or omissions of any subcontractor the \nhiring Party hires as if no subcontract had been made; provided, however, that in no event \nshall the Participating TO, or, as applicable, the CAISO be liable for the actions or \ninactions of the Large Load Interconnection Customer or its subcontractors with respect \nto obligations of the Large Load Interconnection Customer under Article 5 of this LLIA. \nAny applicable obligation imposed by this LLIA upon the hiring Party shall be equally \nbinding upon, and shall be construed as having application to, any subcontractor of such \nParty. \n26.3 \nNo Limitation by Insurance. The obligations under this Article 26 will not be limited in \nany way by any limitation of subcontractor’s insurance. \nArticle 27. Disputes \nAll disputes arising out of or in connection with this LLIA shall be settled in accordance with \nthis Article 27. \n27.1 \nSubmission. In the event either Party has a dispute, or asserts a claim, that arises out of \nor in connection with this LLIA or its performance, such Party (the “disputing Party”) \nshall provide the other Party with written notice of the dispute or claim (“Notice of \nDispute”). Such dispute or claim shall be referred to a designated senior representative of \neach Party for resolution on an informal basis as promptly as practicable after receipt of \nthe Notice of Dispute by the other Party. In the event the designated representatives are \nunable to resolve the claim or dispute through unassisted or assisted negotiations within \nthirty (30) Calendar Days of the other Party’s receipt of the Notice of Dispute, such claim \nor dispute may, upon mutual agreement of the Parties, be submitted to arbitration and \nresolved in accordance with the arbitration procedures set forth below. In the event the \nParties do not agree to submit such claim or dispute to arbitration, each Party may \nexercise whatever rights and remedies it may have in equity or at law consistent with the \nterms of this LLIA."},{"page":283,"startToken":106640,"endToken":107189,"text":"51 \n27.2 \nExternal Arbitration Procedures. Any arbitration initiated under this LLIA shall be \nconducted before a single neutral arbitrator appointed by the Parties. If the Parties fail to \nagree upon a single arbitrator within ten (10) Calendar Days of the submission of the \ndispute to arbitration, each Party shall choose one arbitrator who shall sit on a three (3)-\nmember arbitration panel. The two arbitrators so chosen shall within twenty (20) \nCalendar Days select a third arbitrator to chair the arbitration panel. In either case, the \narbitrators shall be knowledgeable in electric utility matters, including electric \ntransmission and bulk power issues, and shall not have any current or past substantial \nbusiness or financial relationships with any party to the arbitration (except prior \narbitration). The arbitrator(s) shall provide each of the Parties an opportunity to be heard \nand, except as otherwise provided herein, shall conduct the arbitration in accordance with \nthe Commercial Arbitration Rules of the American Arbitration Association (“Arbitration \nRules”) and any applicable FERC regulations; provided, however, in the event of a \nconflict between the Arbitration Rules and the terms of this Article 27, the terms of this \nArticle 27 shall prevail. \n27.3 \nArbitration Decisions. Unless otherwise agreed by the Parties, the arbitrator(s) shall \nrender a decision within ninety (90) Calendar Days of appointment and shall notify the \nParties in writing of such decision and the reasons therefor. The arbitrator(s) shall be \nauthorized only to interpret and apply the provisions of this LLIA and shall have no \npower to modify or change any provision of this LLIA in any manner. The decision of \nthe arbitrator(s) shall be final and binding upon the Parties, and judgment on the award \nmay be entered in any court having jurisdiction. The decision of the arbitrator(s) may be \nappealed solely on the grounds that the conduct of the arbitrator(s), or the decision itself, \nviolated the standards set forth in the Federal Arbitration Act or the Administrative \nDispute Resolution Act. The final decision of the arbitrator(s) must also be filed with \nFERC if it affects jurisdictional rates, terms and conditions of service, Interconnection \nFacilities, or Network Upgrades. \n27.4 \nCosts. Each Party shall be responsible for its own costs incurred during the arbitration \nprocess and for the following costs, if applicable: (1) the cost of the arbitrator chosen by \nthe Party to sit on the three (3) member panel and one half of the cost of the third \narbitrator chosen; or (2) one half (1/2) the cost of the single arbitrator jointly chosen by \nthe Parties. \nArticle 28. Representations, Warranties and Covenants \n28.1 \nGeneral. Each Party makes the following representations, warranties and covenants: \n28.1.1 Good Standing. Such Party is duly organized, validly existing and in good standing \nunder the laws of the state in which it is organized, formed, or incorporated, as \napplicable; that it is qualified to do business in the state or states in which the Large \nLoad Facility, Interconnection Facilities and Network Upgrades owned by such \nParty, as applicable, are located; and that it has the corporate power and authority to \nown its properties, to carry on its business as now being conducted and to enter into \nthis LLIA and carry out the transactions contemplated hereby and perform and"},{"page":284,"startToken":107189,"endToken":107678,"text":"52 \ncarry out all covenants and obligations on its part to be performed under and \npursuant to this LLIA. \n28.1.2 Authority. Such Party has the right, power and authority to enter into this LLIA, to \nbecome a Party hereto and to perform its obligations hereunder. This LLIA is a \nlegal, valid and binding obligation of such Party, enforceable against such Party in \naccordance with its terms, except as the enforceability thereof may be limited by \napplicable bankruptcy, insolvency, reorganization or other similar laws affecting \ncreditors’ rights generally and by general equitable principles (regardless of \nwhether enforceability is sought in a proceeding in equity or at law). \n28.1.3 No Conflict. The execution, delivery and performance of this LLIA does not \nviolate or conflict with the organizational or formation documents, or bylaws or \noperating agreement, of such Party, or any judgment, license, permit, order, \nmaterial agreement or instrument applicable to or binding upon such Party or any of \nits assets. \n28.1.4 Consent and Approval. Such Party has sought or obtained, or, in accordance with \nthis LLIA will seek or obtain, each consent, approval, authorization, order, or \nacceptance by any Governmental Authority in connection with the execution, \ndelivery and performance of this LLIA, and it will provide to any Governmental \nAuthority notice of any actions under this LLIA that are required by Applicable \nLaws and Regulations. \nArticle 29. [Reserved] \nArticle 30. Miscellaneous \n30.1 \nBinding Effect. This LLIA and the rights and obligations hereof, shall be binding upon \nand shall inure to the benefit of the successors and assigns of the Parties hereto. \n30.2 \nConflicts. In the event of a conflict between the body of this LLIA and any attachment, \nappendices or exhibits hereto, the terms and provisions of the body of this LLIA shall \nprevail and be deemed the final intent of the Parties. \n30.3 \nRules of Interpretation. This LLIA, unless a clear contrary intention appears, shall be \nconstrued and interpreted as follows: (1) the singular number includes the plural number \nand vice versa; (2) reference to any person includes such person’s successors and assigns \nbut, in the case of a Party, only if such successors and assigns are permitted by this LLIA, \nand reference to a person in a particular capacity excludes such person in any other \ncapacity or individually; (3) reference to any agreement (including this LLIA), document, \ninstrument or tariff means such agreement, document, instrument, or tariff as amended or \nmodified and in effect from time to time in accordance with the terms thereof and, if \napplicable, the terms hereof; (4) reference to any Applicable Laws and Regulations \nmeans such Applicable Laws and Regulations as amended, modified, codified, or \nreenacted, in whole or in part, and in effect from time to time, including, if applicable, \nrules and regulations promulgated thereunder; (5) unless expressly stated otherwise, \nreference to any Article, Section or Appendix means such Article of this LLIA or such"},{"page":285,"startToken":107678,"endToken":108190,"text":"53 \nAppendix to this LLIA, or such Section to the LLIP or such Appendix to the LLIP, as the \ncase may be; (6) “hereunder”, “hereof”, “herein”, “hereto” and words of similar import \nshall be deemed references to this LLIA as a whole and not to any particular Article or \nother provision hereof or thereof; (7) “including” (and with correlative meaning \n“include”) means including without limiting the generality of any description preceding \nsuch term; and (8) relative to the determination of any period of time, “from” means \n“from and including”, “to” means “to but excluding” and “through” means “through and \nincluding”. \n30.4 \nEntire Agreement. This LLIA, including all Appendices and Schedules attached hereto, \nconstitutes the entire agreement among the Parties with reference to the subject matter \nhereof, and supersedes all prior and contemporaneous understandings or agreements, oral \nor written, between or among the Parties with respect to the subject matter of this LLIA. \nThere are no other agreements, representations, warranties, or covenants which constitute \nany part of the consideration for, or any condition to, any Party’s compliance with its \nobligations under this LLIA. \n30.5 \nNo Third-Party Beneficiaries. This LLIA is not intended to and does not create rights, \nremedies, or benefits of any character whatsoever in favor of any persons, corporations, \nassociations, or entities other than the Parties, and the obligations herein assumed are \nsolely for the use and benefit of the Parties, their successors in interest and, where \npermitted, their assigns. \n30.6 \nWaiver. The failure of a Party to this LLIA to insist, on any occasion, upon strict \nperformance of any provision of this LLIA will not be considered a waiver of any \nobligation, right, or duty of, or imposed upon, such Party. \nAny waiver at any time by either Party of its rights with respect to this LLIA shall not be \ndeemed a continuing waiver or a waiver with respect to any other failure to comply with \nany other obligation, right, duty of this LLIA. Termination or Default of this LLIA for \nany reason by the Large Load Interconnection Customer shall not constitute a waiver of \nthe Large Load Interconnection Customer’s legal rights to obtain an interconnection from \nthe Participating TO. Any waiver of this LLIA shall, if requested, be provided in writing. \n30.7 \nHeadings. The descriptive headings of the various Articles of this LLIA have been \ninserted for convenience of reference only and are of no significance in the interpretation \nor construction of this LLIA. \n30.8 \nMultiple Counterparts. This LLIA may be executed in two or more counterparts, each \nof which is deemed an original but all constitute one and the same instrument. \n30.9 \nAmendment. The Parties may by mutual agreement amend this LLIA by a written \ninstrument duly executed by all of the Parties. Such amendment shall become effective \nand a part of this LLIA upon satisfaction of all Applicable Laws and Regulations. \n30.10 Modification by the Parties. The Parties may by mutual agreement amend the \nAppendices to this LLIA by a written instrument duly executed by all of the Parties. Such"},{"page":286,"startToken":108190,"endToken":108453,"text":"54 \namendment shall become effective and a part of this LLIA upon satisfaction of all \nApplicable Laws and Regulations. \n30.11 Reservation of Rights. The Large Load Interconnection Customer and the Participating \nTO shall have the right to make a unilateral filing with FERC to modify this LLIA \npursuant to sections 205 and 206 of the Federal Power Act or any other applicable \nprovision of the Federal Power Act and FERC’s rules and regulations thereunder; \nprovided that each Party shall have the right to protest any such filing by another Party \nand to participate fully in any proceeding before FERC in which such modifications may \nbe considered. Nothing in this LLIA shall limit the rights of the Parties or of FERC under \nsections 205 or 206 of the Federal Power Act and FERC’s rules and regulations \nthereunder, except to the extent that the Parties otherwise mutually agree as provided \nherein. \n30.12 No Partnership. This LLIA shall not be interpreted or construed to create an association, \njoint venture, agency relationship, or partnership among the Parties or to impose any \npartnership obligation or partnership liability upon any Party. No Party shall have any \nright, power or authority to enter into any agreement or undertaking for, or act on behalf \nof, or to act as or be an agent or representative of, or to otherwise bind, another Party. \n30.13 Joint and Several Obligations. Except as otherwise provided in this LLIA, the \nobligations of the CAISO, the Participating TO, and the Large Load Interconnection \nCustomer are several, and are neither joint nor joint and several."},{"page":287,"startToken":108453,"endToken":108499,"text":"IN WITNESS WHEREOF, the Parties have executed this LLIA in multiple originals, \neach of which shall constitute and be an original effective agreement among the Parties. \n[Insert name of Large Load Interconnection Customer] \nBy: _________________________  \nName: ______________________  \nTitle: _______________________  \nDate: _______________________  \n \n[Insert name of Participating TO] \nBy: _________________________  \nName: ______________________  \nTitle: _______________________  \nDate: _______________________"},{"page":288,"startToken":108499,"endToken":108560,"text":"Appendices to LLIA \nAppendix A Interconnection Facilities, Network Upgrades and Distribution Upgrades \nAppendix B Milestones \nAppendix C Interconnection Details \nAppendix D Security Arrangements Details \nAppendix E Commercial Operation Date \nAppendix F Addresses for Delivery of Notices and Billings  \nAppendix G Large Load Interconnection Customer’s Share of Costs of Network \nUpgrades for Applicable Project Group \nAppendix H Co-Location and Behind-the-Meter Generation Provisions"},{"page":289,"startToken":108560,"endToken":108784,"text":"Appendix A \nAppendix A \n \nInterconnection Facilities, Network Upgrades and Distribution Upgrades \nA-1: Facilities and Upgrades \n \nParticipating TO will coordinate with the Large Load Interconnection Customer to ensure that all \nlocal state utility franchise rules and regulations are adhered to through, among other things, \narrangements that provide for station service directly from the local franchised public \nutility.  Participating TO will coordinate with the Large Load Interconnection Customer to \nfacilitate any necessary pseudo-tie or similar arrangement for the delivery of power into the CAISO \nBAA. \n \n1. Interconnection Facilities: \n(a) \n[insert Large Load Interconnection Customer’s Interconnection Facilities]: \n(b) \n[insert Participating TO’s Interconnection Facilities]: \n2. \nNetwork Upgrades: \n(c) \n[insert Other Network Upgrades]: \n(i) \n \n(ii) \n[insert Participating TO’s Network Upgrades] \n3. \nDistribution Upgrades: \n \nA-2: FILI  \n1. Large Load Interconnection Customer has elected to take FILI until the Network Upgrades \nidentified in this Appendix A have reached Commercial Operation. \n2. The following documents and process shall be executed, undertaken and provided for FILI \nInterconnection Service applicants: \na. A pro forma Flexible Interconnection Service Addendum to the pro forma Large \nLoad Interconnection Agreement (or, alternatively, a standalone pro forma Flexible \nInterconnection Agreement) that identifies the roles and responsibilities for \nimpacted parties that will identify customer- and site-specific equipment and \nsystems necessary to operationalize FILI service; \nb. Study methodologies will be revised to recognize the unique operational \ncharacteristics of flexible large loads;"},{"page":290,"startToken":108784,"endToken":108976,"text":"Appendix A \nc. Operational requirements for FILI service will be revised, including curtailment \nimplementation mechanisms and data reporting; \nd. Cost responsibility provisions will be revised, including any financial security \nduring the conditional service period; \ne. Procedures for the transition-to-firm Interconnection Service provisions for FILI \nwill be implemented that specify the automatic conversion to firm service upon \nNetwork Upgrade completion; \nf. Coordination mechanisms shall be promulgated that address coordination between \nFILI Service and the Participating TO study process; and \ng. Operational requirements shall be revised to address the management of longer-\nduration curtailments in coordination with, as applicable, the CAISO. \n3. Further, the following considerations will be addressed in the FILI application process: \na. Curtailment triggers and operating conditions and the process for establishing \ncurtailment parameters; \nb. Deployment priorities between FILI and non-FILI applicants; \nc. Scheduling treatment between FILI and non-FILI Large Load Facilities; \nd. The relationship between operational restrictions and study assumptions; \ne. Potential interactions with scheduling, dispatch, and price formation; and \nf. How the FILI Interconnection Service may apply to co-located load arrangements \n[and existing generation resources], particularly where load flexibility can reduce \ntransmission impacts or support continued wholesale market participation."},{"page":291,"startToken":108976,"endToken":108981,"text":"Appendix B \nAppendix B \n \nMilestones"},{"page":292,"startToken":108981,"endToken":108987,"text":"Appendix C \nAppendix C \n \nInterconnection Details"},{"page":293,"startToken":108987,"endToken":109069,"text":"Appendix D \nAppendix D \n \nSecurity Arrangements Details \nInfrastructure security of CAISO Controlled Grid equipment and operations and control \nhardware and software is essential to ensure day-to-day CAISO Controlled Grid reliability and \noperational security. FERC will expect the Participating TOs, CAISO, market participants, and \nLarge Load Interconnection Customers interconnected to the CAISO Controlled Grid to comply \nwith Applicable Reliability Criteria. All public utilities will be expected to meet basic standards \nfor system infrastructure and operational security, including physical, operational, and cyber-\nsecurity practices."},{"page":294,"startToken":109069,"endToken":109198,"text":"Appendix E \nAppendix E \n[This Appendix E sets forth a form of letter to be provided by the Large Load Interconnection \nCustomer to the CAISO and Participating TO to provide formal notice of the Commercial \nOperation of a Large Load Facility.] \n[Date] \n[CAISO Address] \n[Participating TO Address] \nRe: \n__________ Large Load Facility \nDear ____________: \nOn [Date] [Large Load Interconnection Customer] has completed Trial Operation of \nUnit No. ___. This letter confirms that [Large Load Interconnection Customer] commenced \nCommercial Operation of Unit No. ___ at the Large Load Facility, effective as of [Date plus one \nday] and that [Large Load Interconnection Customer] provided the CAISO’s operations \npersonnel advance notice of its intended Commercial Operation Date no less than five (5) \nBusiness Days prior to that date. \nThank you. \n[Signature] \n[Large Load Interconnection Customer Representative]"},{"page":295,"startToken":109198,"endToken":109264,"text":"Appendix F \nAppendix F \nAddresses for Delivery of Notices and Billings \nNotices: \nParticipating TO: \n[To be supplied.] \nLarge Load Interconnection Customer: \n[To be supplied.] \nCAISO: \n[To be supplied.] \nBillings and Payments: \nParticipating TO: \n[To be supplied.] \nLarge Load Interconnection Customer: \n[To be supplied.] \nCAISO: \n[To be supplied.] \nAlternative Forms of Delivery of Notices (telephone, facsimile or e-mail): \nParticipating TO: \n[To be supplied.] \nLarge Load Interconnection Customer:"},{"page":296,"startToken":109264,"endToken":109273,"text":"Appendix F \n[To be supplied.] \nCAISO: \n[To be supplied.]"},{"page":297,"startToken":109273,"endToken":109291,"text":"Appendix G \n \nAppendix G \n \nLarge Load Interconnection Customer’s Share of Costs of Network Upgrades for \nApplicable Project Group"},{"page":298,"startToken":109291,"endToken":109805,"text":"Appendix H \n \nAppendix H Co-Location and Behind-the-Meter Generation Provisions \nH.1 \nPurpose and Scope. This Appendix H sets forth the terms that apply where the Large Load \nFacility is, or will be: (a) physically connected to the facilities of an existing or planned generating \nfacility on the generator interconnection customer’s side of the Point of Interconnection (“Co-\nLocated Generation”); or (b) served by a generating facility or energy storage device that delivers \nenergy to the Large Load Facility without using the transmission system or any distribution \nfacilities (“Behind-the-Meter Generation”). The Participating TO’s Tariff governs the \ninterconnection of the Large Load Facility, and the CAISO Tariff governs the interconnection of \nany generating facility that injects, or may inject, energy into the CAISO Controlled Grid. This \nAppendix H memorializes the procedures by which the Participating TO, the CAISO, and the \nLarge Load Interconnection Customer will coordinate those processes. Station power load, and \ngeneration that exclusively serves station power load, are excluded from this Appendix H. \nH.2 \nDescription of Co-Located Generation and Behind-the-Meter Generation. The Co-\nLocated Generation and/or Behind-the-Meter Generation serving the Large Load Facility, if any, \nis described as follows: [Identify facility name, owner/operator, technology type, nameplate \ncapacity (MW), storage capacity (MW/MWh), metering configuration, and whether the facility is: \n(i) back-up generation used only during outages or islanding; (ii) non-exporting Behind-the-Meter \nGeneration; or (iii) generation that may export energy to the CAISO Controlled Grid.] \nH.3 \nNon-Exporting Configurations. Back-up generation used only during outages or \nislanding, and non-exporting Behind-the-Meter Generation, do not require a CAISO generator \ninterconnection request and may be accommodated under the Participating TO’s Tariff, provided \nthat the Large Load Interconnection Customer installs and maintains control technologies and/or \nprotection systems sufficient to ensure that no energy is injected into the CAISO Controlled Grid \nand that such facilities do not adversely affect the CAISO Controlled Grid. The Large Load \nInterconnection Customer shall provide the Participating TO with all generation characteristics of \nsuch facilities, and the Participating TO shall provide that information to the CAISO in accordance \nwith Article H.6. \nH.4 \nPower Injection Triggers CAISO Generator Interconnection Process. Any injection, \nor proposed capability to inject, energy from Co-Located Generation or Behind-the-Meter \nGeneration into the CAISO Controlled Grid shall require the generating facility to submit an \ninterconnection request and be studied under the CAISO Tariff, including screening and \nparticipation in the applicable cluster study, and to execute a generator interconnection agreement \nwith the CAISO and the Participating TO (or a non-conforming agreement or bridging agreement \nwhere appropriate) before any such injection occurs. Scoring, financial requirements, and study \nresults shall be based on the interconnection capacity requested, which may be less than the \ngenerating facility’s maximum output. The generating facility may exercise all rights available \nunder the CAISO Tariff, including surplus interconnection service, grid enhancing technologies, \nand phasing. Any participating generator shall also complete the CAISO new resource \nimplementation process and execute a CAISO Participating Generator Agreement. No injection \ninto the CAISO Controlled Grid is authorized under this LLIA, and any unauthorized injection \nshall be a Breach of this LLIA."},{"page":299,"startToken":109805,"endToken":110347,"text":"Appendix H \n \nH.5 \nCoordination Procedures. Where Article H.4 applies, the Parties shall coordinate as \nfollows: (a) the Large Load Interconnection Customer shall submit comprehensive information on \nboth the Large Load Facility and the generating facility in the CAISO resource interconnection \nprocess and the Participating TO load interconnection process; (b) the Participating TO and the \nCAISO shall exchange and compare information to ensure that the load and generation studies are \nconsistent with the requested mode of operation and type of service, and shall seek to align load \nand generation study timing so that studies may proceed concurrently; (c) the generation study \nshall commence with the Large Load Facility assumptions and reflect the combined impact of the \nLarge Load Facility and the generating facility as requested; (d) a request to remove or add a co-\nlocated load after commencement of studies shall be made under the Participating TO’s tariff and \nevaluated by the Participating TO and the CAISO Tariff. \nH.6 \nInformation Requirements. In addition to the information required under the CAISO \nresource interconnection process and the operational requirements of this LLIA, the Large Load \nInterconnection Customer shall provide to the Participating TO (which shall provide it to the \nCAISO) and, where Article H.4 applies, to the CAISO: (a) the expected presence and range of \nenergy consumption characteristics of the Large Load Facility; (b) minimum and maximum \ngenerator operating capabilities; (c) generator operating characteristics when the Large Load \nFacility is at its minimum level; (d) market participation status, if any; (e) any load services \nrequested when the generator is offline; and (f) for non-exporting or non-participating generation, \nall generation characteristics. The Large Load Interconnection Customer shall notify the \nParticipating TO and the CAISO of any material change to such information, and forecasts \nsubmitted by the applicable Scheduling Coordinator shall reflect Co-Located Generation and \nBehind-the-Meter Generation impacts on the load forecast. \nH.7 \nMetering, Storage, and Settlement. The Participating TO shall require the Large Load \nFacility to be sub-metered independent of any Co-Located Generation or Behind-the-Meter \nGeneration, and the applicable Scheduling Coordinator shall report such meter values separately \nso that regulation and black start services are assessed on a gross load basis. Any wholesale energy \nstorage resource shall remain operationally separate from, and separately metered and settled from, \nthe Large Load Facility, and its energy shall not be commingled with the Large Load Facility. \nStation power load shall be metered separately consistent with Local Regulatory Authority \nrequirements. \nH.8 \nFull Load Exposure. The Interconnection Service provided under this LLIA shall be \nstudied and provided on the basis of the full Demand of the Large Load Facility, without reduction \nfor Co-Located Generation or Behind-the-Meter Generation, unless the Large Load \nInterconnection Customer has elected a flexible interconnection service with enforceable control \ntechnologies and/or protection systems that limit withdrawals from the CAISO Controlled Grid. \nH.9 \nCAISO Role; Order of Precedence. The CAISO’s obligations under this LLIA with \nrespect to the Large Load Facility are limited to those expressly set forth in this Appendix H and \nin the generator interconnection agreement, Participating Generator Agreement, or other CAISO \nagreement applicable to any Co-Located Generation, and the CAISO shall have no responsibility \nfor the financing or construction of facilities required solely for the Large Load Facility."},{"page":300,"startToken":110347,"endToken":110366,"text":"Appendix IV \nAttachment 4  \nInterconnection Financial Security \nfor Interconnection Requests Processed under the Large Load Interconnection Process and \nTimeline"},{"page":301,"startToken":110366,"endToken":110698,"text":"2 \n \nAttachment 4 \nto the DCRT Large Load Interconnection Process and Timeline  \nDCRT TO Tariff, Appendix IV \nINTERCONNECTION FINANCIAL SECURITY \nDefined Terms: \n \nConstruction Activities shall mean any activities related to the construction of the Network \nUpgrades, including but not limited to equipment procurement, engineering, construction and \nassociated activities. \n \nCurrent Cost Responsibility shall mean the Large Load Interconnection Customer’s current \nallocated costs for Network Upgrades, not to exceed the Maximum Cost Responsibility, in each \ncase pursuant to Section 4 of the Facilities Study Agreement. This cost is used to calculate the \nLarge Load Interconnection Customer’s Interconnection Financial Security requirement. \n \nMaximum Cost Responsibility (MCR) shall mean, pursuant to this Attachment 4 and the \nFacilities Study Agreement, the full cost of: (1) assigned Network Upgrades and (2) Participating \nTransmission Operator’s (TO) Interconnection Facilities. \n \n1. Types of Interconnection Financial Security. \nThe Interconnection Financial Security posted by a Large Load Interconnection Customer \nmay be any combination of the following types of Interconnection Financial Security \nprovided in favor of the Participating TO: \n \n(a) \nan irrevocable and unconditional letter of credit issued by a bank or financial \ninstitution that has a credit rating of A or better by Standard and Poors or A2 \nor better by Moody’s; \n \n(b) \nan irrevocable and unconditional surety bond issued by an insurance company \nthat has a credit rating of A or better by Standard and Poors or A2 or better by \nMoody’s; \n \n(c) \nan unconditional and irrevocable guaranty issued by a company that has a \ncredit rating of A or better by Standard and Poors or A2 or better by Moody’s;  \n \n(d) \na cash deposit standing to the credit of the Participating TO in an interest-\nbearing escrow account maintained at a bank or financial institution that is \nreasonably acceptable to the Participating TO; \n \n(e) \na certificate of deposit in the name of the Participating TO issued by a bank or \nfinancial institution that has a credit rating of A or better by Standard and \nPoors or A2 or better by Moody’s; or"},{"page":302,"startToken":110698,"endToken":111072,"text":"3 \n \n(f) \na payment bond certificate in the name of the Participating TO issued by a \nbank or financial institution that has a credit rating of A or better by Standard \nand Poors or A2 or better by Moody’s. \n \nInterconnection Financial Security instruments as listed above shall be in such form as \nthe Participating TO may reasonably require from time to time by notice to Large Load \nInterconnection Customers or in such other form as has been evaluated and approved as \nreasonably acceptable by the Participating TO. \n \nThe Participating TO shall publish and maintain standardized forms related to the types \nof Interconnection Financial Security listed above which shall be accessible on the \nParticipating TO’S Website. The Participating TO shall require the use of standardized \nforms of Interconnection Financial Security to the greatest extent possible. If at any time \nthe guarantor of the Interconnection Financial Security fails to maintain the credit rating \nrequired by this Section 1, the Large Load Interconnection Customer shall provide to the \nParticipating TO replacement Interconnection Financial Security meeting the \nrequirements of this Section 1 within five (5) Business Days of the change in credit \nrating. \n \nInterest on a cash deposit standing to the credit of the Participating TO in an interest-\nbearing escrow account under Section 1(d) will accrue to the account of the Large Load \nInterconnection Customer. \n \n2. Interconnection Financial Security-Initial Posting for Large Load Interconnection \nCustomers. \n2.1 Each Large Load Interconnection Customer shall post, with notice to the \nParticipating TO, two (2) separate Interconnection Financial Security instruments: \n(i) a posting relating to the applicable Network Upgrades; and (ii) a posting \nrelating to the Participating TO’s Interconnection Facilities. \n \n2.2 Timing of Postings. The postings set forth in this Section 2 shall be made any \ntime after the issuance of the Facilities Study report but no later than ninety (90) \ncalendar days after issuance of the Facilities Study report for Large Load \nInterconnection. \n \n2.3 Revised Study Reports. If the Participating TO revises a Facilities Study, the \ninitial postings will be due from the Large Load Interconnection Customer by the \nlater of ninety (90) calendar days after issuance of the original Facilities Study \nReport or forty (40) calendar days after issuance of the revised Facilities Study \nreport."},{"page":303,"startToken":111072,"endToken":111505,"text":"4 \n \n2.4 Posting Amount for Network Upgrades. \n \n2.4.1 Large Load Interconnection Customers. Each Large Load \nInterconnection Customer for a Large Load Facility shall post an \nInterconnection Financial Security instrument relating to the Network \nUpgrades assigned to such Large Load Interconnection Customer pursuant \nto the Facilities Study. \nThe posting amount for such Network Upgrades shall equal the lesser of: \n(i) fifteen percent (15%) of the Current Cost Responsibility assigned to the \nLarge Load Interconnection Customer in the Facilities Study for Network \nUpgrades; (ii) $20,000 per megawatt of electrical load of the Large Load \nFacility or the amount of megawatt increase in the load of each existing \nLarge Load Facility as listed by the Large Load Interconnection Customer \nin its Large Load Interconnection Application, including any requested \nmodifications thereto; or (iii) $7,500,000, but in no event less than \n$500,000. \n \n2.5 Posting Amount for Participating TO Interconnection Facilities. \n2.5.1 Large Load Interconnection Customers. Each Large Load \nInterconnection Customer for a Large Load Facility shall post an \nInterconnection Financial Security instrument in an amount equal to the \nlesser of: (i) fifteen percent (15%) of the Current Cost Responsibility \nassigned to the Large Load Interconnection Customer in the Facilities \nStudy for Participating TO’s Interconnection Facilities; (ii) $20,000 per \nmegawatt of electrical load of the Large Load Facility or the amount of \nmegawatt increase in the load of each existing Large Load Facility as \nlisted by the Large Load Interconnection Customer in its Large Load \nInterconnection Application including any requested modifications \nthereto; or (iii) $7,500,000, but in no event less than $500,000. \n2.6 Cost Estimates Less than Minimum Posting Amounts. If (1) the Current Cost \nResponsibility of the assigned Network Upgrades, (2) the allocated costs of the \nParticipating TO Interconnection Facilities, or (3) both are less than the respective \nminimum posting amounts that would apply under Sections 2.3.1 or 2.4.1, then \nthe posting amount required will equal the Current Cost Responsibility of the \nAssigned Network Upgrades or the allocated costs for Participating TO \nInterconnection Facilities, as applicable. \n \n2.7 Consequences for Failure to Post. The failure by a Large Load Interconnection \nCustomer to timely post the Interconnection Financial Security required by this \nAttachment 4 shall result in the Large Load Interconnection Application being \ndeemed withdrawn. The Large Load Interconnection Customer shall provide the \nParticipating TO and the Participating TO with written notice that it has posted \nthe required Interconnection Financial Security no later than the applicable final \nday for posting. The failure by a Large Load Interconnection Customer to timely"},{"page":304,"startToken":111505,"endToken":111918,"text":"5 \n \npost the Interconnection Financial Security required by this Section 2 shall result \nin the Large Load Interconnection Application being deemed withdrawn. The \nLarge Load Interconnection Customer shall provide the Participating TO with \nwritten notice that it has posted the required Interconnection Financial Security no \nlater than the applicable final day for posting. \n \n2.8 Re-calculation of Initial Posting Requirement. If withdrawals, modifications, \nor system changes occur after the completion of the Facilities Study, and the \nParticipating TO, is able to reasonably determine, prior to the date for initial \nposting of Interconnection Financial Security, that as a result of such decrease \n(solely or in combination with other modifications made by Large Load \nInterconnection Customers) some of the Network Upgrades and/or Participating \nTO Interconnection Facilities identified in the Facilities Study will no longer be \nrequired, then the calculation of the initial posting of Interconnection Financial \nSecurity will not include those Network Upgrades and/or Participating TO \nInterconnection Facilities. Such determination will be made based on the \nParticipating TO’s best engineering judgment and will not include any re-studies.  \n \n3. Interconnection Financial Security –Second and Third Postings for Large Load \nInterconnection Customers. \n \n3.1 Second Posting for Large Load Interconnection Customers. \n \n3.1.1 Each Large Load Interconnection Customer shall make second postings, \nwith notice to the Participating TO, of two separate Interconnection \nFinancial Security instruments: (i) a second posting relating to the \nNetwork Upgrades; and (ii) a second posting relating to the Participating \nTO’s Interconnection Facilities. The Current Cost Responsibility for \ncalculating the second and third Interconnection Financial Security \npostings for Large Load Interconnection Customers shall be set forth in \nthe Facilities Study report. \n \n3.1.2 The postings set forth in this Section 3 for second postings for Large Load \nInterconnection Customers shall be made any time after issuance of the \nFacilities Study report but no later than thirty (30) calendar days prior to \nthe date on which the Facilities Study report provides that such amounts \nwill be needed to fund long lead time equipment procurement as part of \nthe Construction Activities for the Network Upgrades or the Participating \nTO’s Interconnection Facilities, whichever is earlier. \n \n3.2 Third Posting for Large Load Interconnection Customers. \n \n3.2.1 After the second posting for a Large Load Interconnection Customer has \nbeen made but no later than thirty (30) calendar days after the date on \nwhich the Participating TO provides notice that Participating TO is \nobligated to provide security needed to fund any additional obligations for"},{"page":305,"startToken":111918,"endToken":112266,"text":"6 \n \nNetwork Upgrades or Participating TO’s Interconnection Facilities on \nbehalf of the Large Load Interconnection Customer, whichever is earlier, \nthe Large Load Interconnection Customer shall modify the two (2) \nseparate Interconnection Financial Security instruments posted pursuant to \nSection 3.1. \n \n3.3 Determining Refundable Portion of the Interconnection Financial Security \nfor Network Upgrades. \n3.3.1 Withdrawal Between the First Posting and the Deadline for the \nSecond Posting. If the Large Load Interconnection Customer either \nwithdraws its Large Load Interconnection Application or terminates its \nLarge Load Interconnection Agreement (LLIA) at any time between the \ninitial posting and the deadline for the second posting of the \nInterconnection Financial Security for applicable Network Upgrades, then \nthe Participating TO shall liquidate the Interconnection Financial Security \nfor the applicable Network Upgrades and reimburse the Large Load \nInterconnection Customer the lesser of: \na. \nthe Interconnection Financial Security plus (any other provided \nsecurity plus any separately provided capital) less (all costs and \nexpenses incurred or irrevocably committed to finance Pre-\nConstruction Activities for Network Upgrades on behalf of the \nLarge Load Interconnection Customer); or \n \nb. \nthe Interconnection Financial Security plus (any other provided \nsecurity plus any separately provided capital) minus the lesser \nof fifty percent (50%) of the value of the posted \nInterconnection Financial Security for Network Upgrades or \n$10,000 per requested and approved, pre-downsized megawatt \nof the Large Load Facility load. \n \n3.3.2 Withdrawal Between the Second Posting and the Commencement of \nConstruction Activities. If the Large Load Interconnection Customer \neither withdraws or terminates its LLIA at any time after the second \nposting of the Interconnection Financial Security for applicable Network \nUpgrades and the Commencement of Construction Activities for such \nNetwork Upgrades, then the Participating TO shall liquidate the \nInterconnection Financial Security for the applicable Network Upgrades \nand reimburse the Large Load Interconnection Customer the lesser of: \n \na. \nthe Interconnection Financial Security plus (any other provided \nsecurity plus any separately provided capital) less (all costs and \nexpenses incurred or irrevocably committed to finance Pre-\nConstruction Activities for Network Upgrades on behalf of the \nLarge Load Interconnection Customer) and less (any posting"},{"page":306,"startToken":112266,"endToken":112654,"text":"7 \n \nreduction due to the Large Load Interconnection Customer’s \nelection to self-build Stand Alone Network Upgrades); or \nb. \nthe Interconnection Financial Security plus (any other provided \nsecurity plus any separately provided capital) minus the lesser \nof fifty percent (50%) of the value of the posted \nInterconnection Financial Security for Network Upgrades or \n$20,000 per requested and approved, pre-downsized megawatt \nof the Large Load Facility load. \n3.3.3 Special Treatment Based on Failure to Obtain Necessary Permit or \nAuthorization from Governmental Authority. If, at any time after the \nsecond posting requirement, the Large Load Interconnection Customer \nwithdraws the Large Load Interconnection Application or terminates the \nLLIA, as applicable, because the Large Load Interconnection Customer \nreceived a final denial from the primary issuing Governmental Authority \nfor authorization necessary for the construction or operation of the Large \nLoad Facility, and the Network Upgrades to be financed by the Large \nLoad Interconnection Customer are also to be financed by one or more \nother Large Load Interconnection Customers, then the provisions of \nSection 3.3.2 apply, except that the Large Load Interconnection Customer \nshall not be reimbursed for its share of any actual costs incurred or \nirrevocably committed by the Participating TO for Construction Activities. \n \n3.3.4 After Commencement of Construction Activities. Once Construction \nActivities on Network Upgrades on behalf of the Large Load \nInterconnection Customer commence, any withdrawal of the Large Load \nInterconnection Application or termination of the LLIA by the Large Load \nInterconnection Customer will be treated as follows: \n \nThe Participating TO shall liquidate the Interconnection Financial \nSecurity, or balance thereof, posted by the Large Load Interconnection \nCustomer for Network Upgrades at the time of withdrawal. \n \nTo the extent the amount of the liquidated Interconnection Financial \nSecurity plus capital, if any, separately provided by the Large Load \nInterconnection Customer to satisfy its obligation to finance Network \nUpgrades exceeds the total cost responsibility for Network Upgrades \nassigned to the Large Load Interconnection Customer, the Participating \nTO shall remit to the Large Load Interconnection Customer the excess \namount. \n \nWithdrawal of a Large Load Interconnection Application or termination of \na LLIA shall result in the release to the Large Load Interconnection \nCustomer of any Interconnection Financial Security posted by the Large \nLoad Interconnection Customer for Participating TO Interconnection \nFacilities, except with respect to any amounts necessary to pay for costs"},{"page":307,"startToken":112654,"endToken":112872,"text":"8 \n \nincurred or irrevocably committed by the Participating TO on behalf of the \nLarge Load Interconnection Customer for the Participating TO’s \nInterconnection Facilities and for which the Participating TO has not been \nreimbursed in accordance with this Attachment 4. Withdrawal of a Large \nLoad Interconnection Application or termination of a LLIA shall result in \nthe release to the Large Load Interconnection Customer of any \nInterconnection Financial Security posted by the Large Load \nInterconnection Customer for Participating TO Interconnection Facilities, \nexcept with respect to any amounts necessary to pay for costs incurred or \nirrevocably committed by the Participating TO on behalf of the Large \nLoad Interconnection Customer for the Participating TO’s Interconnection \nFacilities and for which the Participating TO has not been reimbursed in \naccordance with this Section 3.3.4. \n \n3.3.5 Accounting by The Participating TO. Within twenty (20) calendar days \nof any liquidating event, the Participating TO shall provide the \nParticipating TO and Large Load Interconnection Customer with an \naccounting of the disposition of the proceeds of the liquidated \nInterconnection Financial Security and remit to the Participating TO all \nproceeds not otherwise reimbursed to the Large Load Interconnection \nCustomer or applied to costs incurred or irrevocably committed by the \nParticipating TO on behalf of the Large Load Interconnection Customer in \naccordance with this Attachment 4."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":67,"startToken":0,"endToken":381},{"p":2,"at":67,"title":"I. BACKGROUND","method":"printed heading","endPage":2,"endAt":83,"startToken":381,"endToken":383},{"p":2,"at":83,"title":"A. DCRT","method":"printed heading","endPage":2,"endAt":849,"startToken":383,"endToken":498},{"p":2,"at":849,"title":"B. Commission’s Show Cause Order","method":"printed heading","endPage":5,"endAt":67,"startToken":498,"endToken":1447},{"p":5,"at":67,"title":"C. DRCT’s Understanding of the CAISO’s Position","method":"printed heading","endPage":6,"endAt":1722,"startToken":1447,"endToken":2060},{"p":6,"at":1722,"title":"II. DCRT’S PROPOSED TARIFF REVISIONS ARE JUST AND REASONABLE","method":"printed heading","endPage":6,"endAt":1834,"startToken":2060,"endToken":2078},{"p":6,"at":1834,"title":"A. The Interconnection Study Process Proposed in DCRT’s TO Tariff, Appendix IV","method":"printed heading","endPage":11,"endAt":198,"startToken":2078,"endToken":4316},{"p":11,"at":198,"title":"B. Overview of DCRT’s Pro Forma Large Load Interconnection Agreement","method":"printed heading","endPage":14,"endAt":68,"startToken":4316,"endToken":5920},{"p":14,"at":68,"title":"C. DCRT’s Large Load Interconnection Process is Designed to Operate in Close","method":"printed heading","endPage":17,"endAt":1294,"startToken":5920,"endToken":7614},{"p":17,"at":1294,"title":"D. DCRT’s Proposed Flexible Interim Load Interconnection Service","method":"printed heading","endPage":20,"endAt":68,"startToken":7614,"endToken":8908},{"p":20,"at":68,"title":"E. Cost Responsibility for Network Upgrades","method":"printed heading","endPage":20,"endAt":1679,"startToken":8908,"endToken":9154},{"p":20,"at":1679,"title":"F. CAISO Data Exchange","method":"printed heading","endPage":21,"endAt":68,"startToken":9154,"endToken":9336},{"p":21,"at":68,"title":"III. CORRESPONDENCE","method":"printed heading","endPage":21,"endAt":800,"startToken":9336,"endToken":9432},{"p":21,"at":800,"title":"IV. REQUESTED EFFECTIVE DATE","method":"printed heading","endPage":21,"endAt":983,"startToken":9432,"endToken":9458},{"p":21,"at":983,"title":"V. DOCUMENTS ENCLOSED","method":"printed heading","endPage":22,"endAt":68,"startToken":9458,"endToken":9609},{"p":22,"at":68,"title":"VI. SERVICE","method":"printed heading","endPage":22,"endAt":137,"startToken":9609,"endToken":9622},{"p":22,"at":137,"title":"VII. CONCLUSION","method":"printed heading","endPage":26,"endAt":0,"startToken":9622,"endToken":9720},{"p":26,"at":0,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":82,"endAt":3,"startToken":9720,"endToken":29638},{"p":82,"at":3,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":166,"endAt":93,"startToken":29638,"endToken":60694},{"p":166,"at":93,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":227,"endAt":3,"startToken":60694,"endToken":81873},{"p":227,"at":3,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":307,"endAt":1494,"startToken":81873,"endToken":112872}]}