{"document":{"slug":"rec-20261116-5250","title":"Motion to Withdraw Filing and Terminate Docket in Deference to New Proceeding","issued":"2026-11-16","accession":"20261116-5250","docket":"ER26-1479-002","group":"PJM co-location compliance","filer":"PJM Interconnection, L.L.C.","kind":"motion","file":"sources/filings/text/20261116-5250_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5250","tier":"record","sha256":"5756503814e03a6bdee11b2e77e7840560c54fbfb2d60030173939aacee5d54f","pages":4,"tokens":783,"emptyPages":[],"textThemes":["colo"]},"pages":[{"page":1,"startToken":0,"endToken":273,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION  \n \nPJM Interconnection, L.L.C.   \n \n) \nDocket Nos. ER26-1479-002 \n \n \n \n \n \n \n \n \n          \n \nMOTION TO WITHDRAW FILING AND TERMINATE PROCEEDING  \nIN DEFERENCE TO NEW DOCKET  \n \n \nPursuant to Rule 212 of the Federal Energy Regulatory Commission’s \n(“Commission”) Rules of Practice and Procedures,1 and section 35.17(a) of the \nCommission Rules and Regulations,2 PJM Interconnection, L.L.C. (“PJM”) moves to \nwithdraw its August 17, 2026 filing in this proceeding (“August 17 Filing”),3 in which PJM \nproposed revisions to the PJM Open Access Transmission Tariff (“Tariff”) to comply with \nthe Commission’s directives in its Order on Rehearing, Clarification, Compliance Filing, \nand Paper Hearing regarding the terms and conditions of service for Co-Location \nArrangements (“Co-Location Compliance Order”).4   \nGood cause exists to grant this motion.  The Commission’s regulations permit a \npublic utility to withdraw a pending rate filing that “has not become effective and upon \nwhich no Commission or delegated order has been issued.”5  That is the case here.  \nPJM is submitting later today a filing pursuant to section 205 of the Federal Power \nAct (“FPA”),6 in which PJM will submit proposed Tariff revisions in response to the \n \n1 18 C.F.R. § 385.212. \n2 18 C.F.R. § 35.17. \n3 PJM Interconnection, L.L.C., Compliance Filing of PJM Interconnection, L.L.C. in Response to Order on \nRehearing, Clarification, Compliance Filing, and Paper Hearing in Docket Nos. EL25-49-002, et al., Docket \nNo. ER26-1479-002 (Aug. 17, 2026). \n4 PJM Interconnection, L.L.C., 195 FERC ¶ 61,209 (2026). \n5 18 C.F.R. § 35.17(a). \n6 16 U.S.C. § 824d."},{"page":2,"startToken":273,"endToken":589,"text":"2 \nCommission’s directives in the Co-Location Compliance Order and the Commission’s \nshow cause order concerning Large Loads that directed PJM to “address[] the integration \nof large loads that are not co-located with generation.”7  As part of that filing, PJM will \nresubmit the Tariff revisions proposed in the August 17 Filing because those revisions are \ninterrelated with PJM’s holistic response to the Co-Location Compliance Order and Large \nLoads Order.  Because PJM’s filing later today will moot the August 17 Filing and Docket \nNo. ER26-1479-002, they should be withdrawn and terminated.8   \nNo party will be harmed by this withdrawal and termination because parties will \nhave the opportunity to address the same proposed Tariff revisions (in some cases modified \nto align with the addition of provisions addressing Large Loads) in the new docket \nestablished for PJM’s upcoming filing on November 16, 2026.  Further, because the August \n17 Filing was submitted as a compliance filing, the records from that filing cannot be \n‘overtaken by events’ in the new FPA section 205 filing later today, which means the \nCommission would have to act on the August 17 Filing and the upcoming PJM filing in a \nnew docket, despite the fact that the new filing will duplicate the Tariff revisions proposed \nin the August 17 Filing.  Withdrawing the August 17 Filing allows for more efficient and \nstreamlined processing of PJM’s Co-Location- and Large Load-related proposed Tariff \nrevisions.  PJM will file a notice once the Commission has established a docket for the \nPJM filing later today, to inform participants in this proceeding of the new docket that \ncontains the Tariff revisions proposed in the August 17 Filing. \n \n7 See PJM Interconnection, L.L.C., 195 FERC ¶ 61,211, at P 2 (2026) (“Large Loads Order”). \n8 To be clear, PJM does not request withdrawal or termination of any filing or docket other than the August \n17 Filing and Docket No. ER26-1479-002."},{"page":3,"startToken":589,"endToken":709,"text":"3 \n \nFor the reasons stated above, PJM requests that the Commission grant this motion \nto withdraw the August 17 Filing and terminate Docket No. ER26-1479-002. \nRespectfully submitted, \n \n \n \n \n \n     \n   \n/s/ Wendy B. Warren  \nMark J. Stanisz \nAssociate General Counsel \nPJM Interconnection, L.L.C. \n2750 Monroe Blvd. \nNorristown, PA  19403-2429 \n(610) 666-4707 \nmark.stanisz@pjm.com    \n \nCraig Glazer  \nVice President – Federal Government \nPolicy  \nPJM Interconnection, L.L.C.  \n1200 G Street, NW, Suite 600 \nWashington, DC  \n20005 (202) 423-4743  \ncraig.glazer@pjm.com  \n        Wendy B. Warren \nRuth M. Porter \nWright & Talisman, P.C. \n1200 G Street, NW, Suite 600 \nWashington, DC  20005-3898 \n202-393-1200 (phone) \n202-393-1240 (fax) \nwarren@wrightlaw.com \nporter@wrightlaw.com \n \n \nCounsel for PJM Interconnection, \nL.L.C.  \n \n \nNovember 16, 2026"},{"page":4,"startToken":709,"endToken":783,"text":"CERTIFICATE OF SERVICE \n \nI hereby certify that I have this day served the foregoing document upon each \nperson designated on the official service list compiled by the Secretary in this proceeding. \n \nDated at Washington, D.C., this 16th day of November 2026. \n/s/ Ruth M. Porter \n \n \n \nRuth M. Porter \nWright & Talisman, P.C. \n1200 G Street, NW, Suite 600 \nWashington, DC  20005-3898 \n202-393-1200 (phone) \nporter@wrightlaw.com \n \n \nAttorney for PJM Interconnection, \nL.L.C."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":4,"endAt":0,"startToken":0,"endToken":709},{"p":4,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":4,"endAt":475,"startToken":709,"endToken":783}]}
