{"document":{"slug":"rec-20261116-5257-2","title":"Exhibit No. PGE-0001 - Application Process Virani","issued":"2026-11-16","accession":"20261116-5257","docket":"ER27-513-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Pacific Gas and Electric Company","kind":"attachment","file":"sources/filings/text/20261116-5257_004.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5257","tier":"record","parent":"rec-20261116-5257","sha256":"8df1f54c932b56e1f61fcfc1fe80b9dbb569cf23a7b31b3483feb3919134d179","pages":21,"tokens":4722,"emptyPages":[],"textThemes":["study","colo","retail"]},"pages":[{"page":1,"startToken":0,"endToken":43,"text":"Docket No. ER27-XXX-000 \nEXHIBIT PGE-0001 \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPacific Gas and Electric Company \nDocket No. ER27-XXX-000 \nPREPARED DIRECT TESTIMONY OF \nNADIM VIRANI \nINTERCONNECTION APPLICATION PROCESS \nON BEHALF OF \nPACIFIC GAS AND ELECTRIC COMPANY \nNOVEMBER 16, 2026"},{"page":2,"startToken":43,"endToken":251,"text":"Docket No. ER27-XXX-000 \nEXHIBIT PGE-0001 \nPage 1 of 20 \n \n \nPACIFIC GAS AND ELECTRIC COMPANY \n1 \nEXHIBIT PGE-0001 \n2 \nINTERCONNECTION APPLICATION PROCESS \n3 \nI. \nIntroduction \n4 \nQ  \nPlease state your name, title, and business  \n5 \nA  \nMy name is Nadim Virani and I am the Director of Electric Wholesale \n6 \nInterconnection with Pacific Gas and Electric Company (“PG&E”).  My \n7 \nbusiness address is 300 Lakeside Drive, Oakland, California. \n8 \nQ   \nPlease briefly describe your current responsibilities at PG&E. \n9 \nA   \nI manage the team responsible for processing load and generation \n10 \ninterconnection requests submitted through PG&E’s Wholesale Distribution \n11 \nTariff (“WDT”) and PG&E’s Transmission Owner Tariff (“TO Tariff”), \n12 \nincluding Wholesale Transmission Generation Interconnection Requests \n13 \nsubmitted through the California Independent System Operator (“CAISO”).   \n14 \nQ   \nPlease summarize your educational and professional background. \n15 \nA.   \nI have a Bachelor of Science degree in Aerospace Engineering from California \n16 \nPolytechnic University, San Luis Obispo.  I also have a Master of Science in \n17 \nAeronautical Science from Embry Riddle Aeronautical University, Worldwide.  \n18 \nI have 13 years of experience at PG&E including working as an \n19 \nInterconnection Manager within Electric Grid Interconnection, a Business \n20 \nProcess Analyst within the Electric Business Results Team, a Supervisor \n21"},{"page":3,"startToken":251,"endToken":500,"text":"Docket No. ER27-XXX-000 \nEXHIBIT PGE-0001 \nPage 2 of 20 \n \n \nwithin the Electric Grid Interconnection, a Manager of the Wholesale Electric \n1 \nGrid Interconnection team, and a Director of the Electric Grid Interconnection \n2 \nteam before moving into my current role as the Director of the Electric \n3 \nWholesale Interconnection team. \n4 \nQ  \nWhat is the purpose of your testimony? \n5 \nA  \nMy testimony explains and supports the new process proposed by PG&E that \n6 \nwill allow entities that the Federal Energy Regulatory Commission (“FERC” or \n7 \n“Commission”) refers to as Eligible Customers taking transmission service on \n8 \nbehalf of large loads in the Order to Show Cause (“OSC”) to apply for \n9 \ninterconnection service under PG&E’s TO Tariff to serve those Large Loads.  I \n10 \nbegin by explaining the unique nature of the CAISO transmission system and \n11 \nhow transmission planning and interconnection service is addressed generally \n12 \nin the CAISO region.  I then discuss how PG&E’s current TO Tariff addresses \n13 \nWholesale Load Interconnection requests today under Section 10.  Finally, I \n14 \ndescribe the new process PG&E is proposing to address interconnections for \n15 \nservice to Large Load End Users and explain how this new process meets the \n16 \nCommission’s goals.  \n17 \nQ. \nDoes your testimony refer to “Eligible Customers taking transmission service \n18 \non behalf of large loads”? \n19 \nA. \nMy testimony addresses the same wholesale transmission customers referenced \n20 \nin the OSC, but uses terminology tailored to how transmission service is \n21"},{"page":4,"startToken":500,"endToken":743,"text":"Docket No. ER27-XXX-000 \nEXHIBIT PGE-0001 \nPage 3 of 20 \n \n \nprovided in the CAISO region.  The OSC’s use of “Eligible Customer” reflects \n1 \nthe traditional transmission framework established in Order No. 888.  Under \n2 \nOrder No. 888, a customer requests and reserves transmission service from a \n3 \ntransmission provider. The CAISO does not use that framework and therefore \n4 \ndoes not use terms such as “Eligible Customer” in the same way as Order \n5 \nNo. 888 and the OSC.   \n6 \nThe Commission recognized in the OSC that “the framework under \n7 \nwhich CAISO provides transmission service is unique[.]”1  Recognizing that \n8 \nunique nature, PG&E is proposing its own term for an entity that serves the \n9 \nrole of “an Eligible Customer taking transmission service on behalf of large \n10 \nload.”  PG&E proposes to refer to this wholesale transmission customer as the \n11 \n“Transmission Customer for Large Load,” or “TCLL.”  Accordingly, \n12 \nthroughout my testimony, I will use “TCLL” to refer to the wholesale \n13 \ntransmission customers that PG&E has identified as Eligible Customers taking \n14 \ntransmission service on behalf of Large Loads. \n15 \nQ. \nWho is eligible to be a TCLL? \n16 \nA. \nIf a retail load, such as a Large Load End User, is situated in the CAISO \n17 \nBalancing Authority Area (“BAA”), the CAISO requires two (fairly identical \n18 \nin nature) entities to pay the CAISO for transmission service based on the \n19 \n \n1  OSC at P 37."},{"page":5,"startToken":743,"endToken":1012,"text":"Docket No. ER27-XXX-000 \nEXHIBIT PGE-0001 \nPage 4 of 20 \n \n \nGross Load in their service areas.  Those entities are Utility Distribution \n1 \nCompanies (“UDCs”) and MSS Operators (“MSSs”).  These entities own the \n2 \nDistribution System or both the Distribution System and transmission system \n3 \nto which retail customers interconnect.  For investor-owned utilities (“IOUs”) \n4 \nlike PG&E, the UDC interconnects the retail customer and bills it for \n5 \ntransmission service.  Thus, the UDC in the retail service area where a Large \n6 \nLoad End User is located is considered the TCLL.  Accordingly, PG&E is a \n7 \nTCLL for its retail customers including Large Load End Users.  Finally, I will \n8 \nnote that the new proposed Section 10A of the TO Tariff applies to TCLLs in \n9 \nthe CAISO BAA.  If entities outside of the CAISO BAA seek Wholesale \n10 \nInterconnection Service to serve Large Load End Users, those requests will be \n11 \naddressed through the existing process under Section 10 in a similar manner.  I \n12 \nexplain this process later in my testimony.   \n13 \nQ. \nWho is responsible for studying the provision of transmission service to what \n14 \nyou call the TCLL?   \n15 \nA. \nThere is no single entity “responsible for studying the provision of \n16 \ntransmission service to Eligible Customers on behalf of large loads” in the \n17 \nCAISO BAA.  The CAISO engages in transmission planning to ensure that \n18 \nenergy can be delivered to load holistically for the entire BAA as well as to \n19 \ndeliver Energy to Loads that use the CAISO wheeling service to serve \n20 \nWholesale Load outside the BAA.  Participating Transmission Owners \n21"},{"page":6,"startToken":1012,"endToken":1259,"text":"Docket No. ER27-XXX-000 \nEXHIBIT PGE-0001 \nPage 5 of 20 \n \n \n(“Participating TO(s)”) whose facilities are used to deliver energy to loads \n1 \nengage in their own planning in coordination with the CAISO to ensure that \n2 \nsufficient facilities exist to ensure such delivery.  The Participating TOs and \n3 \nthe state provide relevant information to the CAISO about forecast retail load \n4 \nlevels.  In sum, both Participating TOs and the CAISO are responsible for \n5 \nstudies for transmission service.  However, it is important to note that the \n6 \nParticipating TO is responsible for studying Wholesale Load Interconnection \n7 \nservice for entities eligible to apply for such service through its TO Tariff with \n8 \nany network upgrades identified by the study being subject to CAISO \n9 \nconcurrence. \n10 \nQ. \nHow would you characterize the service TCLLs will be taking if it is not \n11 \ntransmission service from the CAISO. \n12 \nA. \nI would describe it as a TCLL obtaining Wholesale Load Interconnection \n13 \nservice on behalf of a Large Load End User.  The CAISO is proposing \n14 \nmodifications to its tariff that recognizes that “End Users, including Large \n15 \nLoads, interconnect to the CAISO Controlled Grid pursuant to Participating \n16 \nTO and retail tariffs in accordance with Local Regulatory Authority \n17 \nrequirements.”2  Thus, when a new retail customer for a new load seeks retail \n18 \nservice from its UDC or MSS, it is expecting, at a minimum, interconnection \n19 \n \n2  CAISO Tariff, Proposed § 25.7 (Large Load Interconnections)."},{"page":7,"startToken":1259,"endToken":1521,"text":"Docket No. ER27-XXX-000 \nEXHIBIT PGE-0001 \nPage 6 of 20 \n \n \nand transmission service.  PG&E does not propose to change that situation in \n1 \nits proposed new process.  The difference will be that, in response to the OSC, \n2 \na retail service request from a Large Load will make a UDC or MSS become a \n3 \nTCLL that must abide by a FERC process to then provide retail services \n4 \nneeded.  Given that a TCLL cannot apply to the CAISO to obtain transmission \n5 \nservice and/or be studied directly under any CAISO process, the FERC-\n6 \njurisdictional process that the TCLL will obtain service through is a Wholesale \n7 \nLoad Interconnection process.  And, in the CAISO, Participating TOs are \n8 \nresponsible for Wholesale Load Interconnections. \n9 \nQ. \nDoes the CAISO have a role in the Wholesale Load Interconnection process? \n10 \nA. \nYes.  The new TCLL Interconnection process likely will trigger studies and \n11 \nanalysis by both the Participating TO and CAISO that will ensure that the \n12 \ntransmission system can safely and reliably deliver energy to the Large Load \n13 \nEnd User.  In new Section 24.3.1(q), the CAISO is proposing to amend its \n14 \nTransmission Planning Process to specifically mention that such process will \n15 \nconsider “[p]lanned and forecasted Large Loads and load growth generally” as \n16 \nwell as “[t]ransmission additions or upgrades planned pursuant to all \n17 \nParticipating TO tariff interconnection processes.”3  The primary process that a \n18 \n \n3  See CAISO, Proposed § 24.3.1.(q) (Inputs to the Unified Planning Assumptions \nand Study Plan)."},{"page":8,"startToken":1521,"endToken":1799,"text":"Docket No. ER27-XXX-000 \nEXHIBIT PGE-0001 \nPage 7 of 20 \n \n \nTCLL will go through, as well as relevant agreements that it will sign, are \n1 \nfound in the TO Tariff.   \n2 \nQ. \nDoes the TO Tariff already have a Wholesale Load Interconnection process? \n3 \nA. \nPG&E has a process for providing Wholesale Load Interconnection service in \n4 \nits TO Tarff.  The other Participating TOs do as well, but that process is both \n5 \ninappropriate for Wholesale Customers with Large Loads and does not meet \n6 \nthe goals, policies, and requirements of the OSC.  My testimony describes how \n7 \nthe proposed changes to PG&E’s TO Tariff, which include a new application \n8 \nprocess for Eligible Customers (e.g., TCLLs) seeking to interconnect Large \n9 \nLoad End Users, satisfies the OSC requirements.  I start with a discussion of \n10 \nthe OSC’s requirements.  Then, I explain the current application process for \n11 \ninterconnecting new and increasing load for Wholesale Load customers under \n12 \nSection 10 of the PG&E TO Tariff.  Next, I describe the proposed application \n13 \nprocess in the new TO Tariff Section 10A and explain how the new process \n14 \nsatisfies the requirements of the OSC.  \n15 \nII. \nWhy Reform Is Needed to the TO Tariff Interconnection Process in Order \n16 \nto Implement the OSC \n17 \nQ. \nWhat is your understanding of the reforms required by the OSC that your \n18 \ntestimony is addressing? \n19 \nA. \nBefore discussing the specific aspects of the OSC that are relevant, I need to \n20 \ndiscuss the OSC in broader terms.  The order indicated that the CAISO and \n21 \nParticipating TOs had to, among other items, explain whether their tariffs \n22"},{"page":9,"startToken":1799,"endToken":2033,"text":"Docket No. ER27-XXX-000 \nEXHIBIT PGE-0001 \nPage 8 of 20 \n \n \nremain just and reasonable without an application process, study procedures, or \n1 \nongoing operational requirements that address the unique characteristics and \n2 \nchallenges of providing transmission service to Eligible Customers on behalf \n3 \nof large loads.4  As discussed above, to abide by the Commission’s OSC, in \n4 \nlight of the CAISO’s unique structure, there needs to be detailed processes that \n5 \nensure TCLLs will be able to provide retail interconnection and transmission \n6 \nservice to Large Load End Users.  To achieve this result, PG&E is proposing a \n7 \nnew interconnection process for TCLLs that begins with an application, which \n8 \nis the focus of my testimony. \n9 \nQ. \nWhat other OSC reforms are relevant to your testimony? \n10 \nA. \nThe OSC also noted that processes and studies with regard to the provision of \n11 \ntransmission service are not described clearly and specifically in the \n12 \nCAISO/Participating TO tariffs or in a manner that will mitigate operational \n13 \nrisks, avoid disputes regarding how studies are conducted, deter speculative or \n14 \nduplicative requests for transmission service by TCLLs, or help avoid \n15 \nexcessive and unnecessary network upgrades.5  Accordingly, my testimony \n16 \nexplains how those concerns are addressed through PG&E’s proposed \n17 \napplication process, including how the proposed provisions will mitigate \n18 \n \n4  OSC at P 40. \n5  OSC at PP 38, 49."},{"page":10,"startToken":2033,"endToken":2258,"text":"Docket No. ER27-XXX-000 \nEXHIBIT PGE-0001 \nPage 9 of 20 \n \n \noperational risks and deter speculative or duplicative requests. \n1 \nQ. \nAre there more specific concerns discussed in the OSC? \n2 \nA. \nYes, the OSC asks whether there is need for a rolling application process, a \n3 \nnonrefundable application fee, sufficient readiness requirements and/or other \n4 \nmeans to deter duplicative or speculative requests and effectively imposes \n5 \nrequirements to submit data on substantially similar pending transmission \n6 \nservice requests on behalf of the same Large Load End User.6  My testimony \n7 \nwill address those issues. \n8 \nIII. \nPG&E’s Existing Wholesale Load Application Interconnection Process  \n9 \nQ.   \nPlease describe the Company’s existing Wholesale Load Interconnection \n10 \nApplication process.   \n11 \nA.   \nPG&E’s existing process for addressing new Wholesale Load Interconnection \n12 \nRequests is contained in Section 10 of the TO Tariff.  Section 10 outlines the \n13 \ninformation required for an interconnection application, as well as how PG&E \n14 \naccepts and processes requests to interconnect Wholesale Load.  Section 10 \n15 \napplies to both requests associated with brand new Wholesale Load, i.e., \n16 \ncaused for example by a new municipalization, as well as changes requested by \n17 \nexisting Wholesale Load customers.  In this proceeding, we are updating the \n18 \nTO Tariff to distinguish this Section 10 “Wholesale Load Interconnection” \n19 \n \n6  OSC at P 58."},{"page":11,"startToken":2258,"endToken":2488,"text":"Docket No. ER27-XXX-000 \nEXHIBIT PGE-0001 \nPage 10 of 20 \n \n \nprocess from the “TCLL Interconnection” process.  The existing process for \n1 \nstudying such Wholesale Load Interconnections informed the new process for \n2 \nstudying TCLL Interconnections.  The testimony of Mr. Nedrud explains those \n3 \nstudy processes. \n4 \nQ. \nWhat are the current requirements for Wholesale Load Interconnection \n5 \nApplications under PG&E’s TO Tariff? \n6 \nA. \nAs noted above, Section 10.2 outlines the information required in what we \n7 \npropose to call a Wholesale Load Interconnection Application and provides \n8 \nthat the Company will determine whether a Wholesale Load Interconnection \n9 \nApplication is complete within ten (10) Business Days after receipt.  \n10 \nSpecifically, an applicant requesting Wholesale Load Interconnection will \n11 \nsubmit an application to PG&E that provides, at a minimum, the \n12 \nInterconnection point(s) to the CAISO Controlled Grid, the resultant or new \n13 \nmaximum amount of Interconnection capacity, and the proposed date for \n14 \nenergization and term of Interconnection service.  PG&E then determines \n15 \nwhether the application is complete, or, if deemed incomplete, attempts to \n16 \nwork with the applicant to remedy any deficiencies in the Wholesale Load \n17 \nInterconnection Application.   \n18 \nQ. \nWhy are you distinguishing between Wholesale Load customers with Load in \n19 \nthe CAISO BAA from other Wholesale Load customers? \n20 \nA. \nThe OSC reflects concerns over ongoing operational requirements for TCLLs.  \n21"},{"page":12,"startToken":2488,"endToken":2731,"text":"Docket No. ER27-XXX-000 \nEXHIBIT PGE-0001 \nPage 11 of 20 \n \n \nIt appears to me that the Commission is concerned that Large Loads create \n1 \nchallenges for operation of the transmission system and necessitate greater \n2 \nvisibility and operational control when providing transmission service.  \n3 \nWithout those controls the reliability of the transmission system could be at \n4 \nrisk.  Paragraph 63 of the OSC explains that the CAISO needs hourly forecasts, \n5 \ntelemetry data, and other data to ensure sufficient visibility or specify \n6 \nrequirements for maintaining communication channels as well the CAISO \n7 \nbeing able to monitor Large Loads and remotely disconnect Large Loads when \n8 \nnecessary.  For any given Large Load End User or any TCLL, there can be \n9 \nonly one BAA operator in charge.  For the CAISO BAA, that operator is \n10 \nCAISO.  For Wholesale Load customers interconnected to PG&E, but who \n11 \nreside outside of the CAISO BAA, their own BAA operator would be in charge \n12 \nof Large Loads interconnecting to their systems.  As I noted earlier in my \n13 \ntestimony, if a Wholesale Load Interconnection customer is located outside the \n14 \nCAISO BAA, PG&E will study that customer request under the existing \n15 \nSection 10 process.  PG&E also intends to treat those customers similarly to \n16 \nTCLLs, including how PG&E studies their Interconnection requests through \n17 \nthe new proposed Cluster Study Process for those requests meeting the \n18 \ndefinition of Electrically Dependent Load.   \n19"},{"page":13,"startToken":2731,"endToken":2990,"text":"Docket No. ER27-XXX-000 \nEXHIBIT PGE-0001 \nPage 12 of 20 \n \n \nQ.   \nPlease summarize the changes you are proposing to the existing Section 10 \n1 \napplication process. \n2 \nA.   \nThe Company proposes to retitle Section 10 of the TO Tariff as the “Wholesale \n3 \nLoad Interconnection Process” to clarify that it outlines the application, study, \n4 \nand interconnection process for Wholesale Load Interconnections other than \n5 \nTCLL Interconnections.  PG&E also proposes changes to Sections 8 and 10 \n6 \nthat clarify which types of entities are eligible for which types of \n7 \ninterconnections and where they should seek service under the TO Tariff.  But, \n8 \nother than renaming the application, the “Wholesale Load Interconnection \n9 \nApplication,” the application and application “process” have not changed.   \n10 \nIV. \nThe TCLL Interconnection Application Process \n11 \nQ. \nPlease describe the TCLL Interconnection Application process. \n12 \nA. \nAs I noted above, it is important to remember that a TCLL will not apply for a \n13 \nTCLL Interconnection prior to a Large Load End User applying under Local \n14 \nRegulatory Authority procedures for retail interconnection service.  Under \n15 \nproposed Section 10A.1, the TCLL process applies if a TCLL has received a \n16 \nvalid request to interconnect and provide retail service to a Large Load End \n17 \nUser.  Nothing in the TO Tariff’s TCLL Interconnection process directly \n18 \nimpacts that retail application process.  However, the TCLL will be required to \n19 \nobtain certain information from the Large Load End User itself to satisfy the \n20 \nrequirements of proposed Section 10A.2, including the information needed for \n21"},{"page":14,"startToken":2990,"endToken":3260,"text":"Docket No. ER27-XXX-000 \nEXHIBIT PGE-0001 \nPage 13 of 20 \n \n \nthe TCLL to attest to PG&E that the Large Load End User has Site Control. \n1 \nProposed Section 10A.2.1 establishes the informational requirements \n2 \nfor a TCLL Interconnection Application, which are designed to deter \n3 \nduplicative or speculative requests for interconnection service on behalf of \n4 \nLarge Load End Users.  Specifically, it requires the TCLL to submit, among \n5 \nother things, the Point of Withdrawal; a proposed fifteen-year load ramp \n6 \nschedule and maximum load; a site plan; an attestation from the TCLL that the \n7 \nLarge Load End User has Site Control that meets pre-defined PG&E \n8 \nrequirements; a single-line electrical diagram; a completed PG&E Large Load \n9 \nTechnical Data Request Workbook; the electrical location of the source of the \n10 \npower (if known); disclosure of TCLL Interconnection requests in the TCLL’s \n11 \nfootprint that are for the same Large Load End User or any of its affiliate(s); \n12 \nthe proposed energization date; information concerning all relevant co-located \n13 \ngenerating facilities, if the Large Load End User will be a Co-Located Large \n14 \nLoad End User; and whether Interim Standard Interconnection Service and/or \n15 \nFlexible Interim Large Load Interconnection (“FILLI”) Service is requested.    \n16 \nQ. \nCan you explain how some of these requirements are intended to deter \n17 \nspeculative or duplicative requests? \n18 \nA. \nYes, first I will discuss the Site Control attestation required from the TCLL’s \n19 \nLarge Load End User.  The concept of Site Control is similar to the concept \n20 \nused by the Large Generator Interconnection Procedures.  Under proposed \n21"},{"page":15,"startToken":3260,"endToken":3536,"text":"Docket No. ER27-XXX-000 \nEXHIBIT PGE-0001 \nPage 14 of 20 \n \n \nSection 10A.2.1, the TCLL must attest that its Large Load End User has Site \n1 \nControl, which the TO Tariff defines as either (i) an option for a fifteen year or \n2 \nlonger lease, or an executed lease for a term of at least fifteen years, for real \n3 \nproperty of sufficient size to house the Large Load; or (ii) an option to \n4 \npurchase, or title to, real property of sufficient size to house the Large Load.  \n5 \nThis requirement deters speculative requests by ensuring that a Large Load \n6 \nEnd User has a real and lasting interest in a site large enough to house its \n7 \nplanned facilities before PG&E begins studying the request.  The fifteen-year \n8 \nlease term also aligns with the fifteen-year load ramp schedule that the TCLL \n9 \nmust submit with its application. \n10 \nQ. \nWhy is there a requirement for disclosure of other TCLL Interconnection \n11 \nrequests in the TCLL’s footprint that are for the same Large Load End User \n12 \nor any of its affiliates? \n13 \nA. \nThis requirement is in response to the OSC itself (Paragraph 58), which \n14 \nindicated that there should be disclosure to CAISO of any substantially similar \n15 \npending transmission service requests on behalf of the same large load \n16 \ncustomer.  Because the CAISO Tariff does not process “transmission service \n17 \nrequests,” we have simply applied the requirement to the TCLL \n18 \nInterconnection Application, so the Participating TO can inform the CAISO.  \n19 \nSuch information will be useful to the Participating TO and the CAISO to \n20 \ncheck for speculative requests.   \n21"},{"page":16,"startToken":3536,"endToken":3799,"text":"Docket No. ER27-XXX-000 \nEXHIBIT PGE-0001 \nPage 15 of 20 \n \n \nQ. \nYou mentioned that a customer must specify whether it is also seeking \n1 \nInterim Standard Interconnection Service or FILLI Interconnection Service \n2 \nin its TCLL Interconnection Application, why is that necessary? \n3 \nA. \nThe new application process allows a TCLL to request FILLI Interconnection \n4 \nService and/or Interim Standard Interconnection Service as part of its TCLL \n5 \nInterconnection Application.  FILLI Interconnection Service is a new optional \n6 \nservice for TCLLs which goes hand in hand with Interim Standard \n7 \nInterconnection Service; both allow applicants to initiate service with available \n8 \ncapacity while system upgrades are being constructed.  For example, it may be \n9 \nthat 100 MW of a 500 MW proposed retail load can be served under Interim \n10 \nStandard Interconnection Service when certain upgrades are complete and the \n11 \n400 MW remaining can be served under FILLI Interconnection Service.  The \n12 \nproposed FILLI Interconnection Service is an as-available service, subject to \n13 \ncurtailment or interruption, which is available to TCLLs for Large Load End \n14 \nUsers, if the end user has the ability to reduce Load at a specified Point of \n15 \nWithdrawal according to the timelines and protocols set forth in an executed \n16 \nand effective Interim Service Agreement.   \n17 \nIf the TCLL, on behalf of the Large Load End User, requests, FILLI \n18 \nInterconnection Service or Interim Standard Interconnection Service, there will \n19 \nbe additional analysis that must be performed, as discussed in Mr. Nedrud’s \n20 \ntestimony.   \n21 \nQ. \nYou mentioned TCLLs seeking interconnections for Co-Located Large Load \n22"},{"page":17,"startToken":3799,"endToken":4066,"text":"Docket No. ER27-XXX-000 \nEXHIBIT PGE-0001 \nPage 16 of 20 \n \n \nEnd Users earlier.  Would a TCLL apply for a TCLL Interconnection for a \n1 \nCo-Located Large Load End User? \n2 \nA. \nYes.  The CAISO stakeholder documents and proposed tariff changes clearly \n3 \nindicate that the CAISO would process certain generator interconnections and \n4 \ntake the Co-Located Large Load End User into account in performing such \n5 \ngenerator studies (with the assistance of the relevant Participating TO).  And, \n6 \nin its September 24, 2026 Draft Final Proposal on Large Load Enhancements, \n7 \nthe CAISO “reiterate[d] that the Participating TOs will continue to govern and \n8 \nstudy all load interconnection requests pursuant to their tariffs.”7  The TCLL \n9 \nInterconnection process thus would be triggered if a “Co-Located Large Load \n10 \nEnd User” sought to be interconnected in the service area of a TCLL.  The \n11 \nproposed CAISO Tariff provisions state in Section 25.7.6 that “Interconnection \n12 \nCustomer must have submitted the request for the interconnection of the Large \n13 \nLoad to the Participating TO pursuant to its tariff by the close of the CAISO’s \n14 \nCluster Application Window.”  Unless a Large Load is electrically islanded \n15 \nfrom the CAISO Controlled Grid, it is PG&E’s understanding that the TCLL \n16 \nInterconnection process would apply.   \n17 \nUnder the proposed TO Tariff, a Large Load End User that uses a non-\n18 \nexporting generating facility to offset some or all of its demand is also a Co-\n19 \n \n7  CAISO, Large Load Enhancements Draft Proposal at 55 (Sept. 24, 2026) \n(https://stakeholdercenter.caiso.com/InitiativeDocuments/Draft-Final-Proposal-\nLarge-Load-Enhancements-Sep-24-26.pdf)."},{"page":18,"startToken":4066,"endToken":4326,"text":"Docket No. ER27-XXX-000 \nEXHIBIT PGE-0001 \nPage 17 of 20 \n \n \nLocated Large Load End User, and its TCLL would apply under Section 10A.  \n1 \nThe TCLL must provide information on all relevant co-located generating \n2 \nfacilities with its application, and under proposed Section 10A.3, every TCLL \n3 \nInterconnection Application associated with a Co-Located Large Load End \n4 \nUser is studied in the Cluster Study Process. \n5 \nQ.   \nAre there any financial commitments being requested with a TCLL \n6 \nInterconnection Application? \n7 \nA. \nYes.  The OSC asks whether a nonrefundable application fee and sufficient \n8 \nreadiness requirements are needed to deter speculative or duplicative requests.  \n9 \nPG&E’s proposed fee structure under proposed Sections 10A.2.2 and 10A.2.3 \n10 \nanswers that question in a manner that aligns with established Commission \n11 \npolicy.  In Order No. 2023, the Commission required interconnection \n12 \ncustomers in the generator interconnection process to submit a nonrefundable \n13 \napplication fee with each interconnection request, along with a study deposit \n14 \nbased on the size of the proposed facility.8    \n15 \nPG&E’s proposed Sections 10A.2.2 and 10A.2.3 follow that framework \n16 \nand require the TCLL to submit with its TCLL Interconnection Application a \n17 \n$25,000 nonrefundable application fee and a study deposit consisting of a \n18 \n \n8  Improvements to Generator Interconnection Procs. & Agreements, Order No. 2023, \n184 FERC ¶ 61,054 at PP 223, 502, order on reh’g, 185 FERC ¶ 61,063 (2023), order \non reh’g, Order No. 2023-A, 186 FERC ¶ 61,199, errata notice, 188 FERC ¶ 61,134 \n(2024)."},{"page":19,"startToken":4326,"endToken":4587,"text":"Docket No. ER27-XXX-000 \nEXHIBIT PGE-0001 \nPage 18 of 20 \n \n \n$500,000 cash deposit and financial security of $1,000 per MW of maximum \n1 \nload.  The $25,000 application fee is nonrefundable and covers PG&E’s cost of \n2 \nreviewing the application, while the study deposit is applied to PG&E’s actual \n3 \nstudy costs.  Based on PG&E’s experience, a $25,000 nonrefundable \n4 \napplication fee is reasonable and appropriate here because it reflects the costs \n5 \nPG&E anticipates incurring to review and evaluate a TCLL Interconnection \n6 \nApplication. \n7 \nV. \nApplication Review and Related Processes \n8 \nQ. \nAfter a TCLL submits an application, what is the next step in the application \n9 \nprocess? \n10 \nA. \nUnder proposed Section 10A.2.4, PG&E will determine within ten (10) \n11 \nBusiness Days of receipt whether the application is complete.  During that \n12 \nperiod, PG&E plans to informally communicate with the TCLL to help resolve \n13 \nany issues that would prevent the application from being deemed complete.  If \n14 \nthose informal efforts to resolve issues are unsuccessful, PG&E will return the \n15 \napplication to the TCLL.  A TCLL can always submit a new application if it \n16 \ncannot achieve “completed” status in a timely fashion.  Because applications \n17 \nare reviewed for completeness on a rolling basis, a TCLL does not need to wait \n18 \nfor an annual window to submit an application, although the timing of an \n19 \napplication for an Electrically Dependent Load may impact which year’s \n20 \nCluster Study Process the request is studied under.   \n21"},{"page":20,"startToken":4587,"endToken":4642,"text":"Docket No. ER27-XXX-000 \nEXHIBIT PGE-0001 \nPage 19 of 20 \n \n \nQ. \nWhat is the next step in the process? \n1 \nA. \nThe next step in the process is the study process and my colleague, \n2 \nMr. Nedrud’s testimony discusses that process. \n3 \nQ.   \nDoes this conclude your Prepared Direct testimony? \n4 \nA.   \nYes, it does. \n5"},{"page":21,"startToken":4642,"endToken":4722,"text":"Pacific Gas and Electric Company \n \n \nDocket No. ER27-XXX-000 \n \n \nDECLARATION \nI, Nadim Virani, identified in the foregoing Prepared Direct Testimony, do hereby \ndeclare under penalty of perjury, that I prepared or caused such testimony to be \nprepared; that the answers appearing therein are true to the best of my knowledge and \nbelief; and that if asked the questions appearing therein, my answers would, under \noath, be the same. \n \nExecuted on November 16, 2026, at Oakland, California. \n \n/s/ \n \nNADIM VIRANI \n \n \nNADIM VIRANI"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":159,"startToken":0,"endToken":65},{"p":2,"at":159,"title":"I. Introduction","method":"printed heading","endPage":3,"endAt":1413,"startToken":65,"endToken":476},{"p":3,"at":1413,"title":"A. My testimony addresses the same wholesale transmission customers referenced","method":"printed heading","endPage":4,"endAt":1192,"startToken":476,"endToken":695},{"p":4,"at":1192,"title":"A. If a retail load, such as a Large Load End User, is situated in the CAISO","method":"printed heading","endPage":5,"endAt":1180,"startToken":695,"endToken":936},{"p":5,"at":1180,"title":"A. There is no single entity “responsible for studying the provision of","method":"printed heading","endPage":7,"endAt":829,"startToken":936,"endToken":1399},{"p":7,"at":829,"title":"A. Yes. The new TCLL Interconnection process likely will trigger studies and","method":"printed heading","endPage":8,"endAt":253,"startToken":1399,"endToken":1564},{"p":8,"at":253,"title":"A. PG&E has a process for providing Wholesale Load Interconnection service in","method":"printed heading","endPage":8,"endAt":1186,"startToken":1564,"endToken":1719},{"p":8,"at":1186,"title":"II. Why Reform Is Needed to the TO Tariff Interconnection Process in Order","method":"printed heading","endPage":8,"endAt":1404,"startToken":1719,"endToken":1757},{"p":8,"at":1404,"title":"A. Before discussing the specific aspects of the OSC that are relevant, I need to","method":"printed heading","endPage":9,"endAt":813,"startToken":1757,"endToken":1928},{"p":9,"at":813,"title":"A. The OSC also noted that processes and studies with regard to the provision of","method":"printed heading","endPage":10,"endAt":193,"startToken":1928,"endToken":2062},{"p":10,"at":193,"title":"A. Yes, the OSC asks whether there is need for a rolling application process, a","method":"printed heading","endPage":10,"endAt":627,"startToken":2062,"endToken":2129},{"p":10,"at":627,"title":"III. PG&E’s Existing Wholesale Load Application Interconnection Process","method":"printed heading","endPage":10,"endAt":814,"startToken":2129,"endToken":2152},{"p":10,"at":814,"title":"A. PG&E’s existing process for addressing new Wholesale Load Interconnection","method":"printed heading","endPage":11,"endAt":439,"startToken":2152,"endToken":2321},{"p":11,"at":439,"title":"A. As noted above, Section 10.2 outlines the information required in what we","method":"printed heading","endPage":11,"endAt":1463,"startToken":2321,"endToken":2476},{"p":11,"at":1463,"title":"A. The OSC reflects concerns over ongoing operational requirements for TCLLs.","method":"printed heading","endPage":13,"endAt":171,"startToken":2476,"endToken":2757},{"p":13,"at":171,"title":"A. The Company proposes to retitle Section 10 of the TO Tariff as the “Wholesale","method":"printed heading","endPage":13,"endAt":814,"startToken":2757,"endToken":2854},{"p":13,"at":814,"title":"IV. The TCLL Interconnection Application Process","method":"printed heading","endPage":13,"endAt":940,"startToken":2854,"endToken":2870},{"p":13,"at":940,"title":"A. As I noted above, it is important to remember that a TCLL will not apply for a","method":"printed heading","endPage":14,"endAt":1451,"startToken":2870,"endToken":3220},{"p":14,"at":1451,"title":"A. Yes, first I will discuss the Site Control attestation required from the TCLL’s","method":"printed heading","endPage":15,"endAt":1034,"startToken":3220,"endToken":3445},{"p":15,"at":1034,"title":"A. This requirement is in response to the OSC itself (Paragraph 58), which","method":"printed heading","endPage":16,"endAt":286,"startToken":3445,"endToken":3578},{"p":16,"at":286,"title":"A. The new application process allows a TCLL to request FILLI Interconnection","method":"printed heading","endPage":17,"endAt":174,"startToken":3578,"endToken":3828},{"p":17,"at":174,"title":"A. Yes. The CAISO stakeholder documents and proposed tariff changes clearly","method":"printed heading","endPage":18,"endAt":531,"startToken":3828,"endToken":4147},{"p":18,"at":531,"title":"A. Yes. The OSC asks whether a nonrefundable application fee and sufficient","method":"printed heading","endPage":19,"endAt":553,"startToken":4147,"endToken":4418},{"p":19,"at":553,"title":"V. Application Review and Related Processes","method":"printed heading","endPage":19,"endAt":702,"startToken":4418,"endToken":4443},{"p":19,"at":702,"title":"A. Under proposed Section 10A.2.4, PG&E will determine within ten (10)","method":"printed heading","endPage":20,"endAt":108,"startToken":4443,"endToken":4606},{"p":20,"at":108,"title":"A. The next step in the process is the study process and my colleague,","method":"printed heading","endPage":20,"endAt":296,"startToken":4606,"endToken":4637},{"p":20,"at":296,"title":"A. Yes, it does.","method":"printed heading","endPage":21,"endAt":533,"startToken":4637,"endToken":4722}]}