{"document":{"slug":"rec-20261116-5257-3","title":"Exhibit No. PGE-0002 - Study Process Nedrud","issued":"2026-11-16","accession":"20261116-5257","docket":"ER27-513-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Pacific Gas and Electric Company","kind":"attachment","file":"sources/filings/text/20261116-5257_005.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5257","tier":"record","parent":"rec-20261116-5257","sha256":"13643e5fe968c862f3810248ba0aed7118f58f7e00c49c10aa6bb111a7bde75b","pages":37,"tokens":9080,"emptyPages":[],"textThemes":["study","cost","colo","flex"]},"pages":[{"page":1,"startToken":0,"endToken":44,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \n   \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPacific Gas and Electric Company \n \n \nDocket No. ER27-XXX-000 \nPREPARED DIRECT TESTIMONY OF \nJENS NEDRUD \nTCLL INTERCONNECTION STUDY PROCESSES \nON BEHALF OF \nPACIFIC GAS AND ELECTRIC COMPANY \nNOVEMBER 16, 2026"},{"page":2,"startToken":44,"endToken":256,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 1 of 37 \n \nPACIFIC GAS AND ELECTRIC COMPANY \n1 \nEXHIBIT PGE-0002 \n2 \nTCLL INTERCONNECTION STUDY PROCESSES \n3 \nI. \nIntroduction \n4 \nQ.   \nPlease state your name, title, and business address. \n5 \nA.   \nMy name is Jens Nedrud and I am Director, Electric Transmission Planning \n6 \nwith Pacific Gas and Electric Company (“PG&E”).  My business address is \n7 \n300 Lakeside Drive, Oakland, California. \n8 \nQ.   \nPlease briefly describe your current responsibilities at PG&E. \n9 \nA.   \nI oversee the interconnection of wholesale and retail load to PG&E’s electric \n10 \ntransmission grid.  I also oversee the transmission planning for PG&E’s \n11 \ntransmission grid enhancements to meet future growth on the system to support \n12 \nthe California Independent System Operator Corporation (“CAISO”) \n13 \nTransmission Planning Process (“TPP”) and comply with federal planning \n14 \ncriteria. \n15 \nQ.   \nPlease summarize your educational and professional background. \n16 \nA.   \nI earned a Bachelor of Science in Electrical Engineering from the University of \n17 \nWashington in 2004 and a Master of Science in Electrical Engineering from \n18 \nthe same university in 2006.  I am a licensed professional engineer in \n19 \nWashington with 20 years of utility experience, leading engineering functions \n20 \nsuch as substation design, distribution and transmission planning, and asset \n21"},{"page":3,"startToken":256,"endToken":503,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 2 of 37 \n \nhealth planning.  I have extensive experience planning transmission system \n1 \nprojects across the Northwest and California. \n2 \nQ.   \nWhat is the purpose of your testimony? \n3 \nA.   \nThe purpose of my testimony is to describe PG&E’s current process for \n4 \nstudying Wholesale Load Interconnections and to identify and explain the new \n5 \nstudy processes PG&E is proposing to adopt to accommodate requests for \n6 \nwholesale interconnection service by entities that PG&E’s Transmission \n7 \nOwner Tariff (“TO Tariff”) identifies as “Transmission Customers for Large \n8 \nLoad” or “TCLLs.”  In particular, I will explain how the proposed changes to \n9 \nthe TO Tariff address the concerns reflected in the Order to Show Cause \n10 \n(“OSC”) issued by the Federal Energy Regulatory Commission (“FERC” or \n11 \n“Commission”) regarding study procedures for TCLLs.   \n12 \nII. \nConcerns Expressed in the OSC Regarding Study Processes  \n13 \nQ. \nCan you summarize your understanding of the Commission’s concerns that \n14 \nare relevant to your testimony and area of expertise?  \n15 \nA. \nThe Commission generally expressed concern that the CAISO and TO Tariffs \n16 \nlack provisions that address “with sufficient clarity and consistency” how the \n17 \nCAISO and/or the Participating Transmission Owners (“Participating TO”) \n18 \nwill timely study the provision of transmission service to Eligible Customers \n19 \non behalf of Large Loads.  The Commission observed that the CAISO does not \n20 \nappear to conduct studies to determine the necessary network upgrades needed \n21"},{"page":4,"startToken":503,"endToken":746,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 3 of 37 \n \nfor the provision of transmission service outside of its TPP.1  FERC thus \n1 \ndirected the CAISO and \n to explain whether their tariffs \n2 \nremain just and reasonable without, among other things, study procedures that \n3 \naddress the unique characteristics and challenges of providing transmission \n4 \nservice or to amend their tariffs to do so.2 \n5 \nQ. \nHow do the CAISO and the Participating TOs study the provision of \n6 \ntransmission service to Eligible Customers as contemplated under the OSC?   \n7 \nA. \nMr. Virani’s testimony provides a more fulsome explanation, but I also will \n8 \ntouch on this issue.  The CAISO does not have a specific process for entities to \n9 \napply for transmission service like other regions.  Similarly, the CAISO region \n10 \ndoes not have a process for studying specific requests for transmission service \n11 \nlike the traditional process contemplated by the Commission’s pro forma Open \n12 \nAccess Transmission Tariff (“OATT”).  Rather, the CAISO engages in \n13 \ntransmission planning holistically for the entire Balancing Authority Area \n14 \n(“BAA”) and the Participating TOs engage in their own planning in \n15 \ncoordination with the CAISO to ensure delivery is possible over their \n16 \ntransmission facilities.  My understanding is that the CAISO is not intending to \n17 \nchange this process.   \n18 \nThe Commission indicated in the OSC that to the extent the CAISO or \n19 \n \n1  OSC at P 39. \n2  Id. at P 40."},{"page":5,"startToken":746,"endToken":985,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 4 of 37 \n \nthe Participating TOs already have procedures and conduct “such studies,” \n1 \n(i.e., transmission service request studies) but those processes are not included \n2 \nin their tariffs, that the CAISO and Participating TOs could amend their tariffs \n3 \nso that the study process was clearer.3  To address this concern, PG&E \n4 \nproposes to create a new interconnection process to study TCLL \n5 \nInterconnections.  Specifically, in paragraph 25 of the OSC, FERC mentions \n6 \nthat the TO Tariff (Wholesale Load) interconnection process “does not grant \n7 \ntransmission service; rather, the applicant must retain the services of a \n8 \nScheduling Coordinator to access transmission service over the CAISO-\n9 \ncontrolled grid.”  The Commission is correct that the existing Wholesale Load \n10 \ninterconnection process (retitled “Wholesale Load Interconnection” process) \n11 \ndoes not “grant transmission service.”  However, it serves a similar purpose \n12 \nbecause once the facilities found to be required for Wholesale Load \n13 \nInterconnection service are planned in coordination with the CAISO and then \n14 \nconstructed, Wholesale Customers’ Scheduling Coordinators need not request \n15 \nor be studied further to schedule power on a firm basis.   \n16 \nQ. \nDoes the TO Tariff address Wholesale Load Interconnections to a particular \n17 \nParticipating TO? \n18 \nA. \nYes, all the Participating TOs’ existing Wholesale Load Interconnection \n19 \nprocesses are limited to Wholesale Customers in light of FERC’s jurisdiction.  \n20 \n \n3  OSC at P 62."},{"page":6,"startToken":985,"endToken":1259,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 5 of 37 \n \nThe “retail service” request process, just like the Wholesale Load \n1 \nInterconnection process, results in the studies being performed that, when \n2 \ncoupled with the TPP, mean that the Scheduling Coordinators for retail load \n3 \nlikewise need not request or be studied further to schedule power on a firm \n4 \nbasis.  In short, the Participating TOs and the CAISO share responsibility for \n5 \nconducting studies that ensure that all Load ultimately is served.  Today, a \n6 \nLarge Load End User in PG&E’s service area would request retail service and \n7 \na PG&E study process would commence.  If the Large Load End User were \n8 \nnot in PG&E’s service area, Participating TO studies would occur under the \n9 \nrespective Participating TO’s TO Tariff.  In both cases, the CAISO TPP would \n10 \nultimately determine what facilities need to be constructed to ensure that a \n11 \nScheduling Coordinator could schedule firm power to the Large Load End \n12 \nUser.   \n13 \nQ. \nHow are you proposing to change the existing processes to satisfy the OSC? \n14 \nA. \nThe changes being proposed are based on the existing roles and \n15 \nresponsibilities.  As my colleague Mr. Virani explains, it is the TO Tariff \n16 \ninterconnection process, coupled with the CAISO’s TPP, that will continue to \n17 \nbe the means of ensuring that Scheduling Coordinators can schedule to \n18 \nparticular Loads, including Large Load End Users.  However, a new process is \n19 \nbeing created to study Large Load End Users whose TCLL interconnects to, or \n20 \nseeks to interconnect to, PG&E’s transmission system.  Under this process, all \n21"},{"page":7,"startToken":1259,"endToken":1521,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 6 of 37 \n \nLarge Load End Users whose TCLLs connect or seek to connect to PG&E’s \n1 \nfacilities, including those who seek service from PG&E as a TCLL, will be \n2 \nstudied under a single tariff, regardless of their retail transmission provider.  \n3 \nAnd, that process will interact with the CAISO TPP much in the same manner \n4 \nas the other existing retail and wholesale study processes.   \n5 \nQ. \nCan you provide more detail as to what concerns were identified by the OSC \n6 \nas relates to the performance of studies for Large Load End Users? \n7 \nA. \nThe specific concerns about studies include \nstudy process that \n8 \nconsidered the unique characteristics and impacts of large loads, such as \n9 \nstudies that evaluate the transmission system’s ability to withstand risks \n10 \nobserved from analyzed large load behavior.4  FERC noted that accurate \n11 \nmodels using electromagnetic transient studies might help to ensure that \n12 \ntransmission service needed on behalf of large loads can be provided without \n13 \ncompromising reliability.5  It also noted the absence of clear and consistent \n14 \nprovisions requiring the evaluation of alternative transmission technologies \n15 \nthat can meet transmission needs more efficiently or cost-effectively than \n16 \ntraditional network upgrades.6  The Commission noted that, “based on the \n17 \nrecord, it appears reasonable that such study processes, culminating in a report \n18 \nto the [TCLL] with the results of the studies, including any Direct Assignment \n19 \n \n4  OSC at P 48. \n5  OSC at P 59. \n6  Id. at P 60."},{"page":8,"startToken":1521,"endToken":1758,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 7 of 37 \n \nFacilities and network upgrades necessary to accommodate the transmission \n1 \nservice request as well as a non-binding good-faith estimate of the cost and the \n2 \ntime to construct such facilities, should take no more than 60-90 calendar days \n3 \nto complete.”7 \n4 \nAs I describe below, PG&E proposes to address those concerns through \n5 \na new TCLL Interconnection process.  However, before discussing that \n6 \nprocess, I think it would be helpful to provide some background on how PG&E \n7 \ncurrently studies Wholesale Load Interconnections under its TO Tariff.  \n8 \nIII. \nPG&E’s Existing Wholesale Load Interconnection study process \n9 \nQ. \nWhat is the purpose of PG&E’s existing Wholesale Load study process? \n10 \nA.   \nWhen a new Wholesale Load customer seeks to interconnect to PG&E’s \n11 \ntransmission system or an existing Wholesale Load customer seeks to modify \n12 \nor expand an existing Wholesale Load Interconnection, PG&E must study the \n13 \nrequest to determine the impacts on its transmission system.  Specifically, a \n14 \nstudy is necessary to identify whether there is adequate transmission capacity \n15 \nto safely and reliably interconnect new or incremental Wholesale Load to \n16 \nPG&E’s electrical system.  The process analyzes the impacts of \n17 \ninterconnecting the Load and identifies any upgrades that will be required to \n18 \naccommodate the Load on the transmission system.  \n19 \n \n7  Id. at P 62."},{"page":9,"startToken":1758,"endToken":2045,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 8 of 37 \n \nQ. \nUnder PG&E’s existing process, how does the Company process applications \n1 \nseeking to interconnect Wholesale Load? \n2 \nA. \nMr. Virani’s testimony describes the application process and the nature of the \n3 \ncustomers seeking what is now called a “Wholesale Load Interconnection.”  \n4 \nAfter determining that an application is complete, in a typical situation, the \n5 \nCompany tenders a System Impact Study Agreement within 20 Business Days \n6 \nof receipt of a Completed Wholesale Load Interconnection Application.  The \n7 \nSystem Impact Study Agreement defines, among other things, the scope, \n8 \ncontent, and assumptions of the study to be completed by the Participating TO, \n9 \nand the estimated time required to complete it.  At the time of execution, the \n10 \napplicant is also required to pay the reasonable estimated cost of performing \n11 \nthe study.  Sections 10.3 and 10.4 set out the timelines for each of these steps.  \n12 \nIf a System Impact Study indicates that additions or upgrades to the ISO \n13 \nControlled Grid are needed to satisfy an applicant’s request for \n14 \nInterconnection, the final step is a Facilities Study under Sections 10.7 and \n15 \n10.8. \n16 \nQ.   \nPlease describe the existing Wholesale Load study process. \n17 \nA.   \nPG&E’s existing TO Tariff outlines the study process for Wholesale Load in \n18 \nSections 10.4 through 10.8.  As I explained above, PG&E uses two separate \n19 \nstudies to analyze Wholesale Loads:  a System Impact Study and, if needed, a \n20 \nFacilities Study.  First, as outlined in Section 10.6 of the TO Tariff, in a typical \n21 \nsituation, PG&E completes a System Impact Study.  The System Impact Study \n22"},{"page":10,"startToken":2045,"endToken":2301,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 9 of 37 \n \nidentifies and analyzes any transmission additions or upgrades that are \n1 \nnecessary to interconnect and serve the Wholesale Load.  The System Impact \n2 \nStudy will also identify any adverse impact on Encumbrances.   \n3 \nQ.   \nHow long does the Company have to complete the System Impact Study? \n4 \nA.   \nSection 10.6 indicates the Company will use “due diligence” to complete the \n5 \nSystem Impact Study within 60 calendar days.  In PG&E’s experience, \n6 \ngenerally, the System Impact Study process takes the full 60 days to complete \n7 \nand can require more time, especially when multiple applications are in the \n8 \nstudy process. \n9 \nQ. \nWhat happens after the System Impact Study?  \n10 \nA.   \nIf the System Impact Study shows that the request can be accommodated \n11 \nwithout Direct Assignment Facilities, Reliability Upgrades, or implementing \n12 \noperating procedures, the applicant must request and execute a Wholesale \n13 \nLoad Interconnection Agreement that will allow them to interconnect to the \n14 \nPG&E transmission system or modify their existing Wholesale Load \n15 \nInterconnection Agreement.  If the study shows that such facilities or upgrades \n16 \nare likely needed, the next step is generally a Facilities Study, as provided in \n17 \nSections 10.7 and 10.8.  \n18 \nThe Facilities Study is a more refined analysis of the impact of interconnecting \n19 \nthe Wholesale Load to the PG&E transmission system as compared to the \n20 \nSystem Impact Study.  The results of the Facilities Study will refine the cost of \n21"},{"page":11,"startToken":2301,"endToken":2540,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 10 of 37 \n \nthe equipment, engineering, procurement and construction work (including \n1 \noverheads) needed to interconnect to the PG&E system.  This gives the \n2 \napplicant a firmer understanding of its cost responsibility before it signs a \n3 \nWholesale Load Interconnection Agreement.   \n4 \nQ. \nDoes Section 10 offer any alternative to that sequence? \n5 \nA. \nYes.  Some applicants would rather move forward quickly than wait for a \n6 \nFacilities Study to refine the cost estimate.  Section 10.12 allows an applicant, \n7 \nafter it receives the System Impact Study for the proposed Wholesale Load \n8 \nInterconnection, to request an Expedited Wholesale Load Interconnection \n9 \nAgreement.  Under the expedited process, the applicant proceeds based on \n10 \nPG&E’s best estimate of costs of any needed Direct Assignment Facilities and, \n11 \nif applicable, Reliability Upgrades, rather than a refined estimate, and agrees to \n12 \npay the actual costs PG&E reasonably incurs. \n13 \nQ. \nWhat types of facilities are identified in these studies? \n14 \nA. \nThe upgrades are grouped into three categories, Direct Assignment Facilities, \n15 \nReliability Upgrades, and transmission network upgrades.   \n16 \nQ. \nHow does PG&E’s study process interact with CAISO’s study and planning \n17 \nprocess? \n18 \nA. \nAs already discussed, Participating TOs such as PG&E are responsible for \n19 \nstudying Wholesale Load Interconnections, and the CAISO is responsible for \n20 \ntransmission planning generally through the TPP as well as Generation \n21"},{"page":12,"startToken":2540,"endToken":2795,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 11 of 37 \n \nInterconnections to the CAISO Controlled Grid.  The results of PG&E’s \n1 \nWholesale Load studies (wholesale and retail) impact the CAISO planning \n2 \nprocess in two distinct ways.  First, when PG&E submits the Wholesale Load \n3 \nInterconnection study results to the CAISO for review in their load \n4 \nconcurrence process, both the Reliability Upgrades and the transmission \n5 \nnetwork upgrades are submitted to the CAISO for their review and \n6 \nconcurrence for inclusion in the TPP.  In addition, the Load identified in \n7 \nWholesale Load Interconnection studies, along with other retail load growth is \n8 \nconsidered in the TPP process and can trigger upgrades.  As a result of these \n9 \ntwo steps, both the upgrades needed to interconnect Wholesale Loads and the \n10 \nLoad itself are integrated into the CAISO’s transmission planning process.  \n11 \nQ. \nCan a Wholesale Load customer interconnect to PG&E’s electrical system if \n12 \nthere is not sufficient transmission capability to accommodate its full load? \n13 \nA.   \nYes.  As part of the study process, to the extent that upgrades are required to \n14 \nserve the full Load, PG&E will identify the portion of the requested Load that \n15 \ncan be accommodated without any Direct Assignment Facilities or Reliability \n16 \nUpgrades.  To the extent the applicant is interested, Section 10.11 allows them \n17 \nto elect partial interim service up to the level of identified partial interim \n18 \nservice capability until the required facilities or upgrades are placed in service. \n19"},{"page":13,"startToken":2795,"endToken":3000,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 12 of 37 \n \nIV. \nThe TCLL Interconnection Study Processes  \n1 \nQ.   \nHow is PG&E proposing to change its TO Tariff to address the requirements \n2 \nof the OSC for studying Large Loads?   \n3 \nA.   \nPG&E is proposing to add a new section (Section 10A) to its TO Tariff to \n4 \naddress TCLL Interconnections.  PG&E proposes using a Serial Study Process \n5 \nfor TCLL requests that do not impact other customers on the transmission \n6 \nsystem.  In addition, PG&E proposes using a new Cluster Study Process for \n7 \nTCLL requests that impact other customers.  I will discuss both processes in \n8 \nturn. \n9 \nQ.   \nWhat is the first step after a TCLL Interconnection Application is deemed \n10 \ncomplete? \n11 \nA. \nWithin 15 Business Days of PG&E deeming an application complete, the \n12 \nCompany will perform an Electrical Independence Test to determine if the \n13 \nLarge Load End User associated with the TCLL’s Interconnection request \n14 \nqualifies as an Electrically Independent Large Load.  The one exception is a \n15 \nrequest associated with a Co-Located Large Load End User, which is always \n16 \nstudied in the Cluster Study Process, as I discuss later in my testimony. \n17"},{"page":14,"startToken":3000,"endToken":3276,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 13 of 37 \n \nQ. \nWhat is an Electrically Independent Large Load? \n1 \nA. \nAs indicated in the proposed TO Tariff definition, an Electrically Independent \n2 \nLarge Load is one where its interconnection impacts are not materially affected \n3 \nby one or more other projects.  In these instances, the interconnecting Large \n4 \nLoad End User and corresponding upgrade facilities would not impact other \n5 \nLoad interconnections.  For example, additional Load in an unconstrained \n6 \nportion of the PG&E system (e.g., which does not depend on pre-identified \n7 \ntransmission upgrades to meet the aggregate Load), and where the incremental \n8 \nLoad does not affect other planned projects or would not be expected to impact \n9 \nother interconnections would be considered electrically independent.  As a \n10 \nresult, PG&E can study this Large Load End User without needing to assume \n11 \nthe status, timing, or configuration of other queued projects.  \n12 \nQ. \nHow do you determine if the Large Load End User is electrically \n13 \nindependent? \n14 \nA. \nTo determine whether a Large Load End User is electrically independent, \n15 \nPG&E will conduct an Electrical Independence Test under proposed Section \n16 \n10A.3.1.  This test requires PG&E to perform the incremental power flow and \n17 \naggregate power flow tests, which look at whether the request, on its own and \n18 \ntogether with other requests, would cause issues on the CAISO Controlled \n19 \nGrid.  If the TCLL Interconnection request does not pass the CAISO \n20 \nControlled Grid incremental power flow and aggregate power flow tests, then \n21 \nit fails the evaluation of electrical independence for the CAISO Controlled \n22"},{"page":15,"startToken":3276,"endToken":3534,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 14 of 37 \n \nGrid, and the request must be studied with the other electrically dependent \n1 \nrequests in the Cluster Study Process under proposed Section 10A.5 or \n2 \nwithdraw.  If it passes, the Large Load End User qualifies as an Electrically \n3 \nIndependent Load, and the request proceeds under the Serial Study Process \n4 \npursuant to proposed Section 10A.4. \n5 \nQ. \nWhy does that matter? \n6 \nA. \nBecause an Electrically Independent Large Load interconnection does not \n7 \nimpact other interconnection applications, it can be studied independent of \n8 \nother interconnection requests and therefore can be completed using the Serial \n9 \nStudy Process which can be completed in the timeframe the Commission \n10 \nenvisions in the OSC, if the TCLL opts out of a Facilities Study.  A TCLL that \n11 \nrequests Interim Standard Interconnection Service and/or Flexible Interim \n12 \nLarge Load Interconnection Service, however, will need a Facilities Study, \n13 \nbecause that is where PG&E identifies and estimates the cost of the TCLL \n14 \nFILLI Facilities. Note that consistent with the TO Tariff, I refer to Flexible \n15 \nInterim Large Load Interconnection Service as FILLI Interconnection Service.  \n16 \nAnd when discussing both Interim Standard Interconnection Service and FILLI \n17 \nInterconnection Service together, I refer to it as Interim Service. \n18 \nQ. \nWhat happens after the Electrical Independence Test? \n19 \nA. \nPG&E will hold a scoping meeting with the TCLL within 5 Business Days of \n20 \ncompleting the Electrical Independence Test.  The purpose of the meeting is to \n21"},{"page":16,"startToken":3534,"endToken":3801,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 15 of 37 \n \naddress the preliminary interconnection scope, discuss the Point of \n1 \nWithdrawal, present preliminary planning assumptions, and assess available \n2 \nsystem capacity.   Within 15 Business Days after the meeting, the TCLL must \n3 \nelect to proceed under the applicable Serial Study Process or withdraw its \n4 \nTCLL Interconnection Application.  If it withdraws at this point, it receives \n5 \nback the unspent portion of its study deposit.  If the Large Load End User is \n6 \nelectrically dependent, it will proceed under the Cluster Study Process in \n7 \nproposed section 10A.5. \n8 \nV. \nSerial Study Process \n9 \nQ. \nDescribe the Serial Study Process that applies to Electrically Independent \n10 \nLarge Loads. \n11 \nA. \nIf a System Impact Study Agreement is required, the Participating TO will \n12 \npresent it to the TCLL at the scoping meeting.  The TCLL then is expected to \n13 \nnotify the Participating TO within 15 Business Days whether it elects to \n14 \nproceed with preparation of a System Impact Study Agreement or withdraw its \n15 \nTCLL Interconnection Application.  The TCLL then must execute the System \n16 \nImpact Study Agreement and return it to the Participating TO within 15 \n17 \nBusiness Days upon receipt.  If the TCLL does not sign, its application is \n18 \ndeemed withdrawn and any unused deposit and security are returned after \n19 \nPG&E’s reasonably incurred costs are covered.  If the TCLL disputes the \n20 \nagreement and asks that it be filed unexecuted, the study is put on hold until \n21 \nFERC acts.  Upon receipt of an executed System Impact Study Agreement, the \n22"},{"page":17,"startToken":3801,"endToken":4063,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 16 of 37 \n \nParticipating TO will use due diligence to complete the required System \n1 \nImpact Study within a 60 Business Day period.  The System Impact Study will \n2 \nidentify whether any Direct Assignment Facilities and TCLL Interconnection \n3 \nNetwork Upgrades are required and provide an estimated cost for such \n4 \nfacilities.  These terms are all defined in the TO Tariff, and I will discuss them \n5 \nfurther below.  The System Impact Study will also identify any adverse impact \n6 \non Encumbrances existing as of the TCLL’s Completed Application Date.  The \n7 \nParticipating TO will consider alternative transmission technologies in the \n8 \nSystem Impact Study process.  If traditional network upgrades are selected \n9 \ninstead of alternative transmission technologies, the Participating TO will \n10 \nprovide a demonstration of why alternative transmission technologies are not \n11 \nfeasible or would not result in lower costs or a faster timeline for \n12 \naccommodating the TCLL Interconnection.  \n13 \nQ. \nWhat happens after the System Impact Study is complete? \n14 \nA. \nWithin 15 Business Days of completion of the System Impact Study, the TCLL \n15 \ndecides how it wants to proceed.  If it is satisfied with the results, it may \n16 \nrequest that the Participating TO tender a TCLL Agreement, Facilities \n17 \nAgreement, and Cost Assurance Agreement in accordance with Section \n18 \n10A.4.8.  If it wants a more refined cost estimate, or if it is seeking Interim \n19 \nStandard Interconnection Service and/or FILLI Interconnection Service, it \n20 \nmust request that the Participating TO tender a Facilities Study Agreement \n21"},{"page":18,"startToken":4063,"endToken":4309,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 17 of 37 \n \npursuant to Section 10A.4.5.  Alternatively, the TCLL may withdraw its \n1 \napplication.  If a TCLL requests a Facilities Study Agreement, the Participating \n2 \nTO will provide a Facilities Study Agreement within 15 Business Days that \n3 \ndefines the scope, content, assumptions and terms of reference for such study; \n4 \nthe estimated time required to complete the required study; and such other \n5 \nprovisions as the parties may reasonably require.  The TCLL shall execute the \n6 \nFacilities Study Agreement and return it to the Participating TO within 15 \n7 \nBusiness Days.  Upon receipt of an executed Facilities Study Agreement, the \n8 \nParticipating TO will use due diligence to complete the required Facilities \n9 \nStudy within a 60-Business Day period.  The Facilities Study refines the cost \n10 \nestimates from the System Impact Study and identifies any TCLL FILLI \n11 \nFacilities, if applicable.   \n12 \nQ. \nWhat happens after the Facilities Study is complete? \n13 \nA. \nWithin 15 Business Days of receipt of the completed Facilities Study, the \n14 \nTCLL shall request the Participating TO to tender a TCLL Agreement, \n15 \nFacilities Agreement, Cost Assurance Agreement, and the optional Interim \n16 \nService Agreement in accordance with Section 10A.4.8 or withdraw its \n17 \napplication.   \n18 \nQ. \nWhat happens once PG&E tenders those agreements? \n19 \nA. \nThe parties then negotiate and execute the TCLL Agreement, Facilities \n20 \nAgreement, Cost Assurance Agreement, and, if applicable, the Interim Service \n21"},{"page":19,"startToken":4309,"endToken":4582,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 18 of 37 \n \nAgreement.  The TO Tariff gives the parties 60 Business Days, which can be \n1 \nextended if negotiations are progressing, to negotiate and execute the \n2 \nagreements and ensure the relevant agreements, if any, are executed by the \n3 \nLarge Load End User.  If the parties cannot reach agreement, the TCLL can \n4 \nask that the agreements be filed unexecuted so that FERC can resolve the \n5 \ndispute.  If the TCLL withdraws its application, the TCLL shall reimburse the \n6 \nParticipating TO for the costs reasonably incurred in processing the \n7 \napplication, after which its remaining security will be released. \n8 \nQ. \nCan you explain how the Direct Assignment Facilities, TCLL \n9 \nInterconnection Network Upgrades, and/or TCLL FILLI Facilities are \n10 \nidentified? \n11 \nA. \nGenerally, the study process identifies all facilities and equipment needed to \n12 \nsafely and reliably interconnect the proposed Large Load End User.  Of that \n13 \nequipment, the Direct Assignment Facilities are those that are owned by the \n14 \nParticipating TO that are necessary to physically and electrically interconnect \n15 \nthe TCLL to the ISO Controlled Grid at the point of interconnection.  Although \n16 \nthis equipment will be at a transmission voltage, it is not part of the ISO \n17 \ncontrolled transmission system.  In contrast, TCLL Interconnection Network \n18 \nUpgrades are the additional facilities needed to expand the transmission system \n19 \nfrom the ISO Controlled Grid to the point of interconnection of the TCLL.  \n20 \nTCLL FILLI Facilities are analogous to the Direct Assignment Facilities in \n21 \nthat they are used exclusively by a Large Load End User taking FILLI \n22"},{"page":20,"startToken":4582,"endToken":4852,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 19 of 37 \n \nInterconnection Service and are required to provide the flexible non-firm \n1 \ninterim service until the Participating TO and TCLL have completed \n2 \ninstallation and commissioning of all equipment necessary for Standard \n3 \nInterconnection Service.  \n4 \nA. \nCluster Study Process \n5 \nQ. \nWhy does the Serial Study Process not work for all TCLL Interconnections? \n6 \nA. \nIt has been my experience that a request to interconnect a significant amount of \n7 \nload, such as a request associated with a Large Load End User, can have \n8 \nelectrical impacts on other customers.  The ability of PG&E to interconnect a \n9 \nLarge Load may be dependent on other requests from Large Load End Users \n10 \non PG&E’s transmission system that are being analyzed at the same time.  As a \n11 \nresult, if PG&E were to study such Electrically Dependent Large Loads \n12 \nsequentially, the Company would have to complete each study, and the \n13 \napplicant would need to decide on whether to proceed, before finalizing the \n14 \nevaluation of additional interconnection requests.  This would be time \n15 \nconsuming and could result in a number of restudies as applicants drop out of \n16 \nthe interconnection queue or change their Load configurations based on study \n17 \nresults.  PG&E already studies all retail service requests for large customers \n18 \n(those > 20 MW) using a cluster study process because it is more cost effective \n19 \nand efficient for the customers.  PG&E proposes to use this cluster study \n20 \nprocess as the basis for the proposed Cluster Study for TCLLs (who will now \n21"},{"page":21,"startToken":4852,"endToken":5142,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 20 of 37 \n \nseek interconnection service on behalf of Large Load End Users).  PG&E will \n1 \ncontinue to use the retail cluster study process for those larger customers (e.g., \n2 \n20 MW to 49.99 MW loads) that are not Large Load End Users.   \n3 \nQ. \nWhen does the Cluster Study Process begin, and which applications are \n4 \nincluded? \n5 \nA. \nPG&E will run one Cluster Study each year.  Each year has a closing date of \n6 \nthe last day of February, by which an application must be complete and found \n7 \nto be Electrically Dependent, or involve a Co-Located Large Load End User, to \n8 \nbe included in that year’s cluster.  The Cluster Study Process will begin on the \n9 \nfirst day of April, or the next Business Day, each year.  A fixed annual \n10 \nschedule allows us to study all of the Electrically Dependent Large Load \n11 \nrequests together using the same assumptions and gives TCLLs and their Large \n12 \nLoad End Users certainty about when their requests will be studied.  Because \n13 \nthe new process will only just be taking effect, the TO Tariff also recognizes \n14 \nthat if no Completed TCLL Interconnection Applications have been found to \n15 \nbe electrically dependent by the last day of February in 2027, there will be no \n16 \nCluster Study Process beginning on April 1, 2027.  Shortly after the closing \n17 \ndate, each TCLL signs a Cluster Study Process Agreement.  Where it makes \n18 \nsense, PG&E may also divide the Cluster into smaller study groups of requests \n19 \nthat electrically affect one another, so that each request is studied together with \n20 \nthe requests that actually matter to it. \n21"},{"page":22,"startToken":5142,"endToken":5409,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 21 of 37 \n \nQ. \nHow does the Company propose to conduct the Cluster Study? \n1 \nA. \nThe Cluster Study Process has two distinct phases.  In Phase 1, PG&E will \n2 \nevaluate all projects in the Cluster using studies that include, but are not \n3 \nlimited to, a short circuit and steady state (thermal and voltage) analysis.  The \n4 \nPhase 1 and Phase 2 Study will identify Participating TO’s required facilities to \n5 \nmitigate thermal overloads and voltage violations, and address short circuit, \n6 \nstability, and other reliability issues associated with the requested service.  The \n7 \nPhase 1 Study shall (i) evaluate the impact of all TCLL Interconnection \n8 \nrequests in the cluster; (ii) preliminarily identify for each TCLL \n9 \nInterconnection request the required Direct Assignment Facilities, TCLL \n10 \nInterconnection Network Upgrades, and TCLL FILLI Facilities; (iii) assess the \n11 \nPoint of Withdrawal selected by each TCLL and potential alternatives to \n12 \nevaluate potential efficiencies in overall system upgrade costs; and (iv) provide \n13 \na good faith estimate of the cost of the Direct Assignment Facilities, TCLL \n14 \nInterconnection Network Upgrades, and TCLL FILLI Facilities for each TCLL \n15 \nInterconnection request.  We coordinate the Phase 1 Study with the CAISO, \n16 \nincluding the development of Base Cases, so that the impacts on the CAISO \n17 \nControlled Grid are modeled accurately. \n18 \nQ. \nWhat happens after completion of Phase 1 Study? \n19 \nA. \nWithin 20 Business Days of providing the final Phase 1 Study report, PG&E \n20 \nwill schedule a Results Meeting with the TCLLs, the CAISO, and any Affected \n21"},{"page":23,"startToken":5409,"endToken":5695,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 22 of 37 \n \nSystem Operators to review the Phase 1 Study results, including each TCLL’s \n1 \nestimated cost responsibility.  Based on the information presented in the \n2 \nmeeting, the TCLLs have 60 Business Days to decide to withdraw their \n3 \napplication or to proceed to the next study phase (Phase 2).  I would expect that \n4 \nthe TCLLs will be consulting with their Large Load End Users, just as they \n5 \nwould throughout the Serial Study Process.  A TCLL that decides to proceed to \n6 \nPhase 2 must sign a Phase 2 Cluster Study Process Agreement, under which it \n7 \nagrees to post refundable security equal to 15 percent of the Phase 1 Study’s \n8 \nestimated cost of its Direct Assignment Facilities and TCLL Interconnection \n9 \nNetwork Upgrades.  That security first pays for PG&E’s actual costs of \n10 \nperforming and administering the Phase 2 Study, so having a signed agreement \n11 \nin place before Phase 2 begins gives PG&E a clear commitment from the \n12 \nTCLL to cover the costs of that phase.  The security also serves two broader \n13 \npurposes.  First, it asks TCLLs to demonstrate a meaningful financial \n14 \ncommitment at the point where the study results become more concrete, which \n15 \nhelps ensure that Phase 2 is performed for requests that are likely to move \n16 \nforward.  Second, PG&E may also use those funds for engineering, design, and \n17 \nprocurement of the Direct Assignment Facilities and TCLL Interconnection \n18 \nNetwork Upgrades identified in the Phase 1 Study, together with the associated \n19 \nlabor, materials, contractor charges, and overhead, including any applicable \n20 \nincome tax component of contribution.  That allows work on long lead-time \n21"},{"page":24,"startToken":5695,"endToken":5955,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 23 of 37 \n \nequipment to begin earlier, which can shorten the time to energization.  The \n1 \nsecurity is refundable, and if it is posted in cash, PG&E pays interest on any \n2 \namount it returns at the commercial paper rate, from the date the security was \n3 \npaid until the date it is refunded. \n4 \nQ.  \nWhat occurs in the Phase 2 Cluster Study process? \n5 \nA. \nThe Phase 2 Study will (i) update, as necessary, analyses performed in the \n6 \nPhase 1 Study to account for the withdrawal of requests after the Phase 1 Study \n7 \nprocess, (ii) identify Direct Assignment Facilities, TCLL Interconnection \n8 \nNetwork Upgrades, and TCLL FILLI Facilities, (iii) assign cost responsibility \n9 \nfor Direct Assignment Facilities, TCLL Interconnection Network Upgrades, \n10 \nand TCLL FILLI Facilities needed for the TCLL’s interconnection request, (iv) \n11 \nallocate estimated cost responsibility for financing the identified TCLL \n12 \nInterconnection Network Upgrades, and (v) identify for each TCLL \n13 \nInterconnection request a final Point of Withdrawal, and preliminarily identify \n14 \nany TCLL Reliability Network Upgrades.  Phase 2 also includes a transient \n15 \nstability study and as needed, a voltage stability analysis, which are more \n16 \ndetailed analyses that are most useful once the cluster has been narrowed to the \n17 \nrequests that are moving forward.  When the study identifies system violations, \n18 \nPG&E will first evaluate whether alternative transmission technologies can \n19 \nmitigate them before turning to traditional network upgrades.  If traditional \n20 \nnetwork upgrades are selected instead of alternative transmission technologies, \n21"},{"page":25,"startToken":5955,"endToken":6203,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 24 of 37 \n \nPG&E will provide a demonstration of why alternative transmission \n1 \ntechnologies are not feasible or would not result in lower costs or a faster \n2 \ntimeline for accommodating the TCLL Interconnection.  \n3 \nQ. \nWhat happens after the Phase 2 Study is complete? \n4 \nA. \nPG&E will hold a second results meeting to review the Phase 2 results, \n5 \nincluding each TCLL’s assigned cost responsibility.  At that point the TCLL \n6 \nhas the information it needs to decide whether to move forward.  If it does, it \n7 \nrequests the TCLL Agreement, Facilities Agreement, Cost Assurance \n8 \nAgreement, and, if applicable, the Interim Service Agreement, and the parties \n9 \nnegotiate and execute those agreements, including with the Large Load End \n10 \nUser where required.  If it does not, it withdraws its application.  If a TCLL \n11 \nwithdraws after Phase 2, PG&E will refund the amounts posted for Phase 2 \n12 \nless the costs it has incurred, including any engineering, design, and \n13 \nprocurement already performed for the TCLL’s request.  If the TCLL moves \n14 \nforward, the parties may agree to apply the remaining Phase 2 financial \n15 \nsecurity toward the TCLL’s upfront payment under the Facilities Agreement, \n16 \nso that the funds the TCLL has already committed go toward the facilities \n17 \nneeded to serve its load and PG&E can order long lead-time equipment and \n18 \nbegin work earlier, which can shorten the time to energization. \n19"},{"page":26,"startToken":6203,"endToken":6471,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 25 of 37 \n \nQ. \nHow will TCLLs be able to understand and verify the results of PG&E’s \n1 \nstudies? \n2 \nA. \nOne of the Commission’s concerns in the OSC was avoiding disputes over how \n3 \nstudies are conducted, and I believe transparency is the best way to address \n4 \nthat.  Under both Phase 1 and Phase 2, the completed Cluster Study reports are \n5 \nprovided to the TCLL, Participating TO, the CAISO, and any Affected System \n6 \nOperators, if applicable. TCLLs also can request supporting documentation \n7 \nand work papers, including the relevant power flow, short circuit, and stability \n8 \ndatabases, subject to appropriate confidentiality arrangements.  That allows a \n9 \nTCLL and its consultants to see the assumptions we used and test our \n10 \nconclusions.  We also commit to keeping TCLLs informed of the schedule.  If \n11 \nit becomes clear that we will not complete a study within the target timeframe, \n12 \nwhether because of the number of requests, study complexity, coordination \n13 \nwith the CAISO, or the availability of contractors, we will notify the TCLLs, \n14 \nexplain why, and provide an estimated completion date.  Finally, the results \n15 \nmeetings after each phase of the Cluster Study, and the scoping meeting in the \n16 \nSerial Study Process, give TCLLs a direct opportunity to ask questions and \n17 \nraise concerns with PG&E and the CAISO before they decide whether to \n18 \nproceed. \n19 \nQ. \nDoes the Company have experience performing cluster studies for Large \n20 \nLoads? \n21 \nA. \nYes, the Company has been performing cluster studies for loads greater than \n22"},{"page":27,"startToken":6471,"endToken":6737,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 26 of 37 \n \n20 MW for several years.   \n1 \nQ. \nWhat has been the Company’s experience to date with these CPUC-\n2 \njurisdictional Large Load interconnection requests? \n3 \nA. \nThe Company has found that studying Large Loads collectively as part of a \n4 \ncluster has been an effective way to identify needs and plan the solutions \n5 \nrequired to interconnect these customers.  In PG&E’s experience, studying \n6 \nElectrically Dependent Large Load requests on a serial basis is extremely \n7 \ninefficient.  Each study must be finished, and each applicant must decide \n8 \nwhether to proceed, before the next request can be studied with confidence, \n9 \nand any change or withdrawal by an earlier request can require later requests to \n10 \nbe restudied.  PG&E has performed 3 Large Load cluster studies thus far, \n11 \ninvolving 93 separate applications, with over 25 GW of Load.  If PG&E had \n12 \nonly used a serial study process, it would have required multiple years to \n13 \nevaluate the applications, significantly delaying their interconnection.  By \n14 \nusing a two-step cluster process, PG&E was able to get phase 1 study results \n15 \nback to the applicants in approximately 9 months, giving them actionable \n16 \ninformation to make their business decisions. \n17 \nQ. \nWhat is the anticipated timeline for these Cluster Studies? \n18 \nA. \nEach phase of the Cluster Study is targeted for completion within 120 Business \n19 \nDays and the entire process, including meetings to discuss results, is estimated \n20 \nto take over a year.  However, the Company proposes to conduct one Cluster \n21"},{"page":28,"startToken":6737,"endToken":6992,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 27 of 37 \n \nStudy Process annually by allowing for some overlap in each Cluster Study \n1 \nProcess. \n2 \nQ. \nWhy do you believe a Cluster Study can be a timelier approach? \n3 \nA.   \nStudying Electrically Dependent Large Loads together produces more accurate \n4 \nresults and avoids serial restudies.  In addition, studying a group of interrelated \n5 \nprojects collectively is more efficient than studying those same projects \n6 \nsequentially.  \n7 \nQ. \nYou previously mentioned the FERC suggestion in the OSC that studies \n8 \nshould be completed in 60-90 days, are you concerned that the Cluster Study \n9 \nProcess is outside those bounds? \n10 \nA. \nI am aware of FERC’s recommendation, but studying each request serially \n11 \nunder a 90-day time frame will result in numerous restudies and will likely \n12 \ntake far longer to ultimately complete.  For requests that are electrically \n13 \nindependent and do not seek an optional Facilities Study, our proposed TO \n14 \nTariff language targets completion of the System Impact Study process within \n15 \n90 Business Days. \n16 \nPG&E has been studying “electrically dependent” Large Loads for \n17 \nseveral years under a cluster study process and its experience is that such \n18 \nstudies will likely take significantly longer than 90 days.  However, while the \n19 \nprocess may take longer than the 90 days contemplated in the OSC, it still \n20 \nremains, in my opinion, the most efficient way to conduct studies of the \n21 \nimpacts of Large Load End Users on the transmission system.  The \n22"},{"page":29,"startToken":6992,"endToken":7279,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 28 of 37 \n \nCommission highlights the reliability impacts of Large Loads on the \n1 \ntransmission system.  This concern is valid and thus, transmission owners, like \n2 \nPG&E must thoughtfully consider what facilities are needed for the safe and \n3 \nreliable interconnection of Large Load End Users.  When such Loads impact \n4 \nmore than one customer and are coming online under similar time periods, it is \n5 \nsimply not possible or reliably sound to study them in isolation over such a \n6 \nshort time period.  Although PG&E understands the urgency of the needs of \n7 \ntechnology companies, particularly given its location, those needs cannot be \n8 \nplaced above the safety of the community and PG&E employees.  \n9 \nQ. \nHow do the study processes address impacts on neighboring transmission \n10 \nsystems? \n11 \nA. \nA Large Load End User can affect transmission systems owned by others, such \n12 \nas neighboring utilities interconnected with PG&E.  When our studies indicate \n13 \nthat another system may be affected, PG&E will notify that system’s operator, \n14 \nthe TCLL, and the CAISO, and coordinate any studies needed to assess the \n15 \nimpacts.  PG&E will include the Affected System Operator in meetings with \n16 \nthe TCLL.  Any upgrades needed on the Affected System are the TCLL’s cost \n17 \nresponsibility, because the TCLL’s request is what creates the need for them, \n18 \nand those costs will be reflected in the Facilities Agreement.  To keep this \n19 \ncoordination from delaying the process, an Affected System Operator that \n20 \ntakes service under PG&E’s TO Tariff must tell us within 40 Business Days \n21 \nwhether it intends to study the TCLL Interconnection Application.  If it does \n22"},{"page":30,"startToken":7279,"endToken":7540,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 29 of 37 \n \nnot respond, it cannot later bring claims against PG&E regarding impacts from \n1 \nthat interconnection. \n2 \nVI. \nInterim Interconnection Services \n3 \nQ. \nCan you describe the new FILLI Interconnection Service and Interim \n4 \nStandard Interconnection Service and how you will study them?  \n5 \nA.   \nThe two services, FILLI Interconnection Service and/or Interim Standard \n6 \nInterconnection Service, build on the existing partial interim service offered to \n7 \ntraditional Wholesale Loads under Section 10.  A study may show that Interim \n8 \nStandard Interconnection Service can be provided to some portion of the total \n9 \namount of Load requested by a TCLL, after certain facilities are built.  As for \n10 \nthe remaining Load, or all the Load if no Interim Standard Interconnection \n11 \nService is available, FILLI Interconnection Service is an optional \n12 \ninterconnection service that PG&E and the CAISO are proposing to offer.  \n13 \nPG&E’s study process for FILLI Interconnection Service will investigate the \n14 \nconditions during which Large Load End Users would need to limit their \n15 \nEnergy withdrawals under certain conditions during the period that network \n16 \nupgrades are being constructed.  The analysis would also consider what \n17 \nfacilities may be needed and what procedures may need to be adopted to allow \n18 \nfor FILLI Interconnection Service, which is an as-available service. \n19 \nIn order to assess how much, if any, Interim Standard Interconnection Service \n20 \nand FILLI Interconnection Service can be offered, PG&E will study the Load \n21 \nunder NERC Transmission System Planning Performance Requirement \n22"},{"page":31,"startToken":7540,"endToken":7819,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 30 of 37 \n \nConditions to determine how much firm service can be offered while upgrades \n1 \nare being constructed to enable firm service for entire Load request.  This \n2 \nanalysis is performed as part of the otherwise applicable study process, rather \n3 \nthan as a separate process.  As part of that analysis, we will complete a \n4 \nflexibility needs analysis to quantify when and how FILLI customers may need \n5 \nto reduce consumption, including the expected magnitude, duration, and \n6 \nlikelihood of those reductions.  That information will allow customers to \n7 \nunderstand and plan for potential operating limitations while supporting \n8 \nreliable interconnection to the transmission system. As part of the FILLI \n9 \nInterconnection Service evaluation, the Company will evaluate the annual load \n10 \nramp of each applicant and identify the expected facilities needed to \n11 \naccommodate their interim flexible service. \n12 \nVII. TCLL Interconnections associated with Co-Located Large Load End \n13 \nUsers \n14 \nQ. \nAre there any special conditions associated with studying requests from \n15 \nTCLLs when the associated Large Load is co-located with, and at least \n16 \npartially supplied by that co-located generation?  \n17 \nA.   \nYes.  These requests are always studied in the Cluster Study Process.  To the \n18 \nextent that a TCLL request indicates that a Co-Located Large Load End User \n19 \ncommits to using on-site generation to reduce a portion or all of its demand, \n20 \nPG&E will study upgrades needed to support the requested level of service.  \n21 \nThat approach only works if we can rely on the Co-Located Large Load End \n22 \nUser staying at or below the level of service requested in the TCLL \n23"},{"page":32,"startToken":7819,"endToken":8111,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 31 of 37 \n \nInterconnection Application, so our studies will take into account the \n1 \nmechanisms the Co-Located Large Load End User proposes to ensure it does \n2 \nnot withdraw more Energy from the grid than it has requested.  If PG&E and \n3 \nthe CAISO are not satisfied that those mechanisms are adequate, the Large \n4 \nLoad must be restudied at the higher level.  In instances where the facility \n5 \nwishes to export power onto the transmission system, the Generating Units co-\n6 \nlocating with Large Load End Users are studied under the CAISO Tariff, and \n7 \nPG&E and the CAISO will produce study results that reflect the combined \n8 \npresence of the Generating Units and Large Loads.  I would expect the CAISO, \n9 \nas BAA, would be the entity that determines what equipment and protocols are \n10 \nneeded to ensure that no more than a pre-determined amount of generation \n11 \nwould appear on its system unexpectedly.  \n12 \nQ. \nWhy are requests associated with Co-Located Large Load End Users always \n13 \nstudied in the Cluster Study Process? \n14 \nA. \nA Co-Located Large Load End User raises questions that a standalone load \n15 \ndoes not.  Because the Co-Located Large Load End User is relying on on-site \n16 \ngeneration to serve part of its demand, we have to understand what happens \n17 \nwhen that Generation is unavailable and the Co-Located Large Load End Users \n18 \nturns to the grid instead.  That means we need to evaluate the protective \n19 \nmechanisms, such as relays, controls, and operating limits, that will keep the \n20 \nCo-Located Large Load End User from drawing more from the CAISO \n21 \nControlled Grid than it has requested, and we need to coordinate that \n22"},{"page":33,"startToken":8111,"endToken":8389,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 32 of 37 \n \nevaluation with the CAISO’s study of the Generating Units co-locating with \n1 \nthe Large Load End User.  That work takes time, and it cannot reliably be \n2 \ncompleted within the timeframe of the Serial Study Process.  The Cluster \n3 \nStudy Process, with its two phases and its coordination with the CAISO, gives \n4 \nPG&E the time to study those protective mechanisms properly.  It also gives us \n5 \nthe time to consider, if a Co-Located Large Load End User were to exceed its \n6 \nrequested capacity, what the consequences should be, including whether \n7 \npenalties for exceeding that capacity are appropriate, similar to the approach \n8 \nPJM has taken for co-located load. \n9 \nVIII. Interaction of PG&E Study Processes and TPP. \n10 \nQ. \nHow will the PG&E study processes interact with the CAISO’s TPP? \n11 \nA. \nAs discussed earlier, PG&E’s study process can identify transmission upgrades \n12 \nthat would be triggered by the Large Load End User.  These study results are \n13 \nsubmitted to the CAISO for review in their concurrence process.  In addition, \n14 \nthe load identified in PG&E’s interconnection studies, together with other load \n15 \ngrowth, is also considered in the CAISO’s TPP which can also identify if \n16 \nadditional upgrades are required to serve the aggregate load.   \n17 \nIX. \nOther Issues \n18 \nQ. \nFERC mentioned electromagnetic transient studies in the OSC, does PG&E \n19 \ninclude such analysis in its study processes? \n20 \nA. \nYes.  PG&E will perform an electromagnetic transient study for a Large Load \n21 \nEnd User approximately one year before the Load is scheduled to be energized.  \n22"},{"page":34,"startToken":8389,"endToken":8680,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 33 of 37 \n \nThe timing matters.  An electromagnetic transient study is only as good as the \n1 \nmodels and assumptions that go into it, including the specific equipment, \n2 \ninverters, and control settings the Large Load End User will install and the \n3 \ncondition of the surrounding system when the load comes online.  Early in the \n4 \ninterconnection process, much of that information is not yet final, so a study \n5 \nperformed at that stage would rest on assumptions that are likely to change and \n6 \nwould produce results that are not reliable.  The CAISO faces a similar issue \n7 \non the generation side, where detailed transient analysis is generally performed \n8 \nlater, once equipment and controls are known.  By performing the study about \n9 \na year ahead of energization, PG&E can use actual equipment data and current \n10 \nsystem conditions, which allows the study to identify issues on the system \n11 \nmore accurately.  A year also leaves enough time to act on the results, such as \n12 \nadjusting control settings or adding protective equipment, before the load is \n13 \nenergized.  In short, performing the study at that point makes it a realistic and \n14 \nactionable study rather than a theoretical one.   \n15 \nQ. \nHow do the various study processes consider the unique characteristics and \n16 \nimpacts of Large Loads, such as evaluating the transmission system’s ability \n17 \nto withstand risks observed from analyzed Large Load behavior? \n18 \nA. \nThe new NERC Computational Load standards and pending updates to the \n19 \nCompany’s Transmission Interconnection Handbook will help define a number \n20 \nof technical requirements specific to Large Load End Users, including detailed \n21 \noperating requirements such as ramp rate limits.  These requirements coupled \n22"},{"page":35,"startToken":8680,"endToken":8950,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 34 of 37 \n \nwith detailed stability requirements as proposed in our interconnection study \n1 \nprocess and active monitoring equipment will enable our operators to manage \n2 \nthese loads to maintain reliability. \n3 \nQ. \nCan you explain in more detail how you will examine alternative \n4 \ntransmission technologies in the study processes? \n5 \nA. \nDuring Phase 1 and Phase 2 of the Large Load Cluster Study Process, once the \n6 \nsystem violations are identified, the transmission planning team will first \n7 \nevaluate whether any alternative transmission technology solutions can apply \n8 \nto mitigate the violations.  If no alternative transmission technology solution \n9 \napplies, transmission planning will proceed with proposals using conventional \n10 \nmitigation solutions \n11 \nQ. \nThe OSC also indicates that study procedures could include readiness \n12 \nrequirements (i.e., meaningful milestones and/or financial commitments) to \n13 \nensure Large Loads are viable and likely to materialize, does the process \n14 \nproposed include such requirements? \n15 \nA. \nMr. Virani addresses the readiness requirements that apply when a TCLL \n16 \nsubmits its application, which is outside the scope of my expertise.  From a \n17 \nstudy perspective, however, the process is structured so that a TCLL must \n18 \naffirmatively decide to move forward at each stage, after the scoping meeting, \n19 \nafter each study, and after each results meeting, or its request is withdrawn.  \n20 \nThat keeps requests that are not progressing from occupying study resources or \n21 \naffecting the results for other customers.  In addition, as I noted earlier, a \n22 \nTCLL that proceeds to Phase 2 of the Cluster Study must post Phase 2 \n23"},{"page":36,"startToken":8950,"endToken":8995,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \nPage 35 of 37 \n \nSecurity, which is a meaningful financial commitment at the point where the \n1 \nstudy results become more concrete. \n2 \nX. \nConclusion \n3 \nQ.   \nDoes this conclude your Prepared Direct testimony? \n4 \nA.   \nYes, it does. \n5"},{"page":37,"startToken":8995,"endToken":9080,"text":"Docket No. ER27-XXXX-000 \nEXHIBIT PGE-0002 \n   \n \n \nPacific Gas and Electric Company \n \n \nDocket No. ER27-XXX-000 \n \nDECLARATION \nI, Jens Nedrud, identified in the foregoing Prepared Direct testimony, do \nhereby declare under penalty of perjury, that I prepared or caused such testimony to \nbe prepared; that the answers appearing therein are true to the best of my knowledge \nand belief; and that if asked the questions appearing therein, my answers would, under \noath, be the same. \n \nExecuted on November 16, 2026, at Oakland, California. \n \n \n \n/s/ Jens Nedrud \n \n \n \nJens Nedrud"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":159,"startToken":0,"endToken":67},{"p":2,"at":159,"title":"I. Introduction","method":"printed heading","endPage":2,"endAt":243,"startToken":67,"endToken":80},{"p":2,"at":243,"title":"A. My name is Jens Nedrud and I am Director, Electric Transmission Planning","method":"printed heading","endPage":3,"endAt":238,"startToken":80,"endToken":291},{"p":3,"at":238,"title":"A. The purpose of my testimony is to describe PG&E’s current process for","method":"printed heading","endPage":3,"endAt":920,"startToken":291,"endToken":398},{"p":3,"at":920,"title":"II. Concerns Expressed in the OSC Regarding Study Processes","method":"printed heading","endPage":3,"endAt":1127,"startToken":398,"endToken":430},{"p":3,"at":1127,"title":"A. The Commission generally expressed concern that the CAISO and TO Tariffs","method":"printed heading","endPage":4,"endAt":565,"startToken":430,"endToken":594},{"p":4,"at":565,"title":"A. Mr. Virani’s testimony provides a more fulsome explanation, but I also will","method":"printed heading","endPage":5,"endAt":1412,"startToken":594,"endToken":957},{"p":5,"at":1412,"title":"A. Yes, all the Participating TOs’ existing Wholesale Load Interconnection","method":"printed heading","endPage":6,"endAt":1104,"startToken":957,"endToken":1169},{"p":6,"at":1104,"title":"A. The changes being proposed are based on the existing roles and","method":"printed heading","endPage":7,"endAt":597,"startToken":1169,"endToken":1364},{"p":7,"at":597,"title":"A. The specific concerns about studies include","method":"printed heading","endPage":8,"endAt":628,"startToken":1364,"endToken":1622},{"p":8,"at":628,"title":"III. PG&E’s Existing Wholesale Load Interconnection study process","method":"printed heading","endPage":8,"endAt":777,"startToken":1622,"endToken":1646},{"p":8,"at":777,"title":"A. When a new Wholesale Load customer seeks to interconnect to PG&E’s","method":"printed heading","endPage":9,"endAt":185,"startToken":1646,"endToken":1786},{"p":9,"at":185,"title":"A. Mr. Virani’s testimony describes the application process and the nature of the","method":"printed heading","endPage":9,"endAt":1312,"startToken":1786,"endToken":1970},{"p":9,"at":1312,"title":"A. PG&E’s existing TO Tariff outlines the study process for Wholesale Load in","method":"printed heading","endPage":10,"endAt":360,"startToken":1970,"endToken":2101},{"p":10,"at":360,"title":"A. Section 10.6 indicates the Company will use “due diligence” to complete the","method":"printed heading","endPage":10,"endAt":753,"startToken":2101,"endToken":2167},{"p":10,"at":753,"title":"A. If the System Impact Study shows that the request can be accommodated","method":"printed heading","endPage":11,"endAt":406,"startToken":2167,"endToken":2361},{"p":11,"at":406,"title":"A. Yes. Some applicants would rather move forward quickly than wait for a","method":"printed heading","endPage":11,"endAt":1092,"startToken":2361,"endToken":2469},{"p":11,"at":1092,"title":"A. The upgrades are grouped into three categories, Direct Assignment Facilities,","method":"printed heading","endPage":11,"endAt":1337,"startToken":2469,"endToken":2504},{"p":11,"at":1337,"title":"A. As already discussed, Participating TOs such as PG&E are responsible for","method":"printed heading","endPage":12,"endAt":1079,"startToken":2504,"endToken":2710},{"p":12,"at":1079,"title":"A. Yes. As part of the study process, to the extent that upgrades are required to","method":"printed heading","endPage":13,"endAt":61,"startToken":2710,"endToken":2804},{"p":13,"at":61,"title":"IV. The TCLL Interconnection Study Processes","method":"printed heading","endPage":13,"endAt":239,"startToken":2804,"endToken":2835},{"p":13,"at":239,"title":"A. PG&E is proposing to add a new section (Section 10A) to its TO Tariff to","method":"printed heading","endPage":13,"endAt":747,"startToken":2835,"endToken":2923},{"p":13,"at":747,"title":"A. Within 15 Business Days of PG&E deeming an application complete, the","method":"printed heading","endPage":14,"endAt":117,"startToken":2923,"endToken":3018},{"p":14,"at":117,"title":"A. As indicated in the proposed TO Tariff definition, an Electrically Independent","method":"printed heading","endPage":14,"endAt":1086,"startToken":3018,"endToken":3172},{"p":14,"at":1086,"title":"A. To determine whether a Large Load End User is electrically independent,","method":"printed heading","endPage":15,"endAt":445,"startToken":3172,"endToken":3350},{"p":15,"at":445,"title":"A. Because an Electrically Independent Large Load interconnection does not","method":"printed heading","endPage":15,"endAt":1466,"startToken":3350,"endToken":3504},{"p":15,"at":1466,"title":"A. PG&E will hold a scoping meeting with the TCLL within 5 Business Days of","method":"printed heading","endPage":16,"endAt":642,"startToken":3504,"endToken":3633},{"p":16,"at":642,"title":"V. Serial Study Process","method":"printed heading","endPage":16,"endAt":773,"startToken":3633,"endToken":3653},{"p":16,"at":773,"title":"A. If a System Impact Study Agreement is required, the Participating TO will","method":"printed heading","endPage":17,"endAt":1124,"startToken":3653,"endToken":3971},{"p":17,"at":1124,"title":"A. Within 15 Business Days of completion of the System Impact Study, the TCLL","method":"printed heading","endPage":18,"endAt":1035,"startToken":3971,"endToken":4225},{"p":18,"at":1035,"title":"A. Within 15 Business Days of receipt of the completed Facilities Study, the","method":"printed heading","endPage":18,"endAt":1421,"startToken":4225,"endToken":4286},{"p":18,"at":1421,"title":"A. The parties then negotiate and execute the TCLL Agreement, Facilities","method":"printed heading","endPage":19,"endAt":830,"startToken":4286,"endToken":4441},{"p":19,"at":830,"title":"A. Generally, the study process identifies all facilities and equipment needed to","method":"printed heading","endPage":20,"endAt":315,"startToken":4441,"endToken":4626},{"p":20,"at":315,"title":"A. Cluster Study Process","method":"printed heading","endPage":20,"endAt":427,"startToken":4626,"endToken":4645},{"p":20,"at":427,"title":"A. It has been my experience that a request to interconnect a significant amount of","method":"printed heading","endPage":21,"endAt":386,"startToken":4645,"endToken":4920},{"p":21,"at":386,"title":"A. PG&E will run one Cluster Study each year. Each year has a closing date of","method":"printed heading","endPage":22,"endAt":128,"startToken":4920,"endToken":5163},{"p":22,"at":128,"title":"A. The Cluster Study Process has two distinct phases. In Phase 1, PG&E will","method":"printed heading","endPage":22,"endAt":1524,"startToken":5163,"endToken":5379},{"p":22,"at":1524,"title":"A. Within 20 Business Days of providing the final Phase 1 Study report, PG&E","method":"printed heading","endPage":24,"endAt":407,"startToken":5379,"endToken":5768},{"p":24,"at":407,"title":"A. The Phase 2 Study will (i) update, as necessary, analyses performed in the","method":"printed heading","endPage":25,"endAt":328,"startToken":5768,"endToken":6008},{"p":25,"at":328,"title":"A. PG&E will hold a second results meeting to review the Phase 2 results,","method":"printed heading","endPage":26,"endAt":152,"startToken":6008,"endToken":6230},{"p":26,"at":152,"title":"A. One of the Commission’s concerns in the OSC was avoiding disputes over how","method":"printed heading","endPage":26,"endAt":1551,"startToken":6230,"endToken":6457},{"p":26,"at":1551,"title":"A. Yes, the Company has been performing cluster studies for loads greater than","method":"printed heading","endPage":27,"endAt":219,"startToken":6457,"endToken":6505},{"p":27,"at":219,"title":"A. The Company has found that studying Large Loads collectively as part of a","method":"printed heading","endPage":27,"endAt":1379,"startToken":6505,"endToken":6695},{"p":27,"at":1379,"title":"A. Each phase of the Cluster Study is targeted for completion within 120 Business","method":"printed heading","endPage":28,"endAt":223,"startToken":6695,"endToken":6775},{"p":28,"at":223,"title":"A. Studying Electrically Dependent Large Loads together produces more accurate","method":"printed heading","endPage":30,"endAt":169,"startToken":6775,"endToken":7305},{"p":30,"at":169,"title":"VI. Interim Interconnection Services","method":"printed heading","endPage":30,"endAt":353,"startToken":7305,"endToken":7332},{"p":30,"at":353,"title":"A. The two services, FILLI Interconnection Service and/or Interim Standard","method":"printed heading","endPage":31,"endAt":979,"startToken":7332,"endToken":7688},{"p":31,"at":979,"title":"VII. TCLL Interconnections associated with Co-Located Large Load End","method":"printed heading","endPage":31,"endAt":1276,"startToken":7688,"endToken":7732},{"p":31,"at":1276,"title":"A. Yes. These requests are always studied in the Cluster Study Process. To the","method":"printed heading","endPage":33,"endAt":738,"startToken":7732,"endToken":8233},{"p":33,"at":738,"title":"VIII. Interaction of PG&E Study Processes and TPP.","method":"printed heading","endPage":33,"endAt":868,"startToken":8233,"endToken":8257},{"p":33,"at":868,"title":"A. As discussed earlier, PG&E’s study process can identify transmission upgrades","method":"printed heading","endPage":33,"endAt":1352,"startToken":8257,"endToken":8335},{"p":33,"at":1352,"title":"IX. Other Issues","method":"printed heading","endPage":33,"endAt":1506,"startToken":8335,"endToken":8360},{"p":33,"at":1506,"title":"A. Yes. PG&E will perform an electromagnetic transient study for a Large Load","method":"printed heading","endPage":34,"endAt":1506,"startToken":8360,"endToken":8634},{"p":34,"at":1506,"title":"A. The new NERC Computational Load standards and pending updates to the","method":"printed heading","endPage":35,"endAt":390,"startToken":8634,"endToken":8738},{"p":35,"at":390,"title":"A. During Phase 1 and Phase 2 of the Large Load Cluster Study Process, once the","method":"printed heading","endPage":35,"endAt":1107,"startToken":8738,"endToken":8841},{"p":35,"at":1107,"title":"A. Mr. Virani addresses the readiness requirements that apply when a TCLL","method":"printed heading","endPage":36,"endAt":181,"startToken":8841,"endToken":8978},{"p":36,"at":181,"title":"X. Conclusion","method":"printed heading","endPage":36,"endAt":261,"startToken":8978,"endToken":8990},{"p":36,"at":261,"title":"A. Yes, it does.","method":"printed heading","endPage":37,"endAt":583,"startToken":8990,"endToken":9080}]}