{"document":{"slug":"rec-20261116-5274-2","title":"SunZia Trans. Large Load Compliance Filing","issued":"2026-11-16","accession":"20261116-5274","docket":"ER27-515-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"SunZia Transmission, LLC","kind":"attachment","file":"sources/filings/text/20261116-5274_006.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5274","tier":"record","parent":"rec-20261116-5274","sha256":"e40db66eb90a5f255a84dcbf80b64d8fc14edfe4c8fe457b076d87036bcbd04c","pages":47,"tokens":18504,"emptyPages":[],"textThemes":["study","cost","colo","flex"]},"pages":[{"page":1,"startToken":0,"endToken":305,"text":"Robert L. Daileader\nSenior Counsel\nT / 202.585.8318\nF / 866.947.3769\nrdaileader@nixonpeabody.com\nAttorneys at Law\nnixonpeabody.com \n@NixonPeabodyLLP \n4923-9080-5463.1 \nNixon Peabody LLP\n799 9th Street NW\nSuite 500\nWashington, DC  20001-5327\nNovember 16, 2026 \nE-TARIFF FILING \nThe Honorable Debbie-Anne A. Reese \nSecretary \nFederal Energy Regulatory Commission \n888 First Street, NE \nWashington, DC 20426 \nRE: \nSunZia Transmission, LLC  \nDocket No. ER27-___-000 \nAmendments to Transmission Owner Tariff in Compliance with the Docket \nNo. EL26-71-000 Order to Show Cause\nDear Secretary Reese: \nPursuant to Section 205 of the Federal Power Act1 and Part 35 of the rules and \nregulations2 of the Federal Energy Regulatory Commission (“Commission”), the Commission’s \nOrder Granting Rescission and Abeyance Requests3 and the Commission’s Order Instituting \nProceeding Under Section 206 of the Federal Power Act,4 SunZia Transmission, LLC (“SunZia \nTransmission”) hereby tenders for filing amendments to its Transmission Owner Transmission \nTariff (“TO Tariff”)5 to incorporate changes to those provisions of the TO Tariff necessary to \ntrack changes being made simultaneously by the California Independent System Operator \nCorporation (“CAISO”) to its Open Access Transmission Tariff (the “CAISO Tariff”) to \nfacilitate the fast and reliable interconnection of new large loads and co-located loads to the \nCAISO-managed transmission system.  The revisions to the SunZia Transmission TO Tariff are \nsubmitted and designated in accordance with Order No. 7146 and the Commission’s e-Tariff \nfiling requirements. \n1  \n16 U.S.C. § 824d (2021). \n2  \n18 C.F.R. Part 35 (2026). \n3\nCalifornia Independent System Operator Corporation, et al., 196 FERC ¶ 61,131 (issued August 14, 2026). \n4\nCalifornia Independent System Operator Corporation, et al., 195 FERC ¶ 61,214 (issued June 18, 2026) (the \n“Order to Show Cause”). \n5  \nSunZia Transmission, LLC, FERC Electric Tariff Volume 2. \n6\nElectronic Tariff Filings, Order No. 714, III FERC Stats. & Regs., Regs. Preambles ¶ 31,276 (2008)."},{"page":2,"startToken":305,"endToken":874,"text":"The Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 2 of 7 \n4923-9080-5463.1 \nI.\nBACKGROUND \nSunZia Transmission is an indirect, wholly-owned subsidiary of Pattern Energy Group \nLP and has developed, constructed and recently placed into commercial operation, an \napproximately 552-mile, bi-pole, high voltage, direct current (“HVDC”) 500 kV transmission \nline (the “Transmission System”) with a transmission capacity of 3,021 MW in New Mexico and \nArizona that connects generation resources in the Southwest with markets and customers in \nCalifornia and Arizona.7  SunZia Transmission commenced construction of the Transmission \nSystem in 2023 and placed the Transmission System into commercial operations in April, 2026.  \nThe Transmission System has been developed as a merchant transmission project with negotiated \nrate authority contingent on the allocation of its transmission capacity pursuant to an open \nsolicitation process reviewed and approved by the Commission.8\nAs a result, the entire capacity of the Transmission System is committed to two \nSubscribers, SunZia Wind South LLC and SunZia Wind North LLC (collectively, the “SunZia \nWind Companies”), both of which own and operate wind-powered electric generating facilities \nlocated in Lincoln, Torrance, and San Miguel Counties, New Mexico (the “SunZia Wind \nProjects”).  SunZia Transmission will provide to the SunZia Wind Companies firm point-to-\npoint transmission service for the entire rated capacity of the Transmission System over a thirty-\nyear term9 from the Point of Receipt at the Pete Heinrich 345 kV AC Switchyard to the Point of \nDelivery at the Salt River Project Agricultural Improvement and Power District’s (“SRP”) Pinal \nCentral 500 kV Substation pursuant to Amended and Restated Transmission Service Agreements \n7 \nSunZia Transmission and the New Mexico Renewable Energy Transmission Authority (“RETA”) have entered \ninto a lease arrangement pursuant to which RETA owns the physical assets of the Transmission System.  \nSunZia Transmission and RETA are both responsible for the co-development of the Transmission System, \nwhile SunZia Transmission is responsible for the construction and financing of the Transmission System and is \nthe owner of the capacity rights created by the Transmission System.  RETA is a state authority established by \nthe New Mexico legislature in 2007 and charged with implementing the New Mexico Renewable Energy \nAuthority Transmission Act, NMSA 1978 § 62-16A-1, et seq. (the “Act”).  As an authority or instrumentality \nof the State of New Mexico, RETA is not a “public utility” within the meaning of Section 201 of the FPA.  See \n16 U.S.C. § 824(f) (2019).  Under the Act, RETA is authorized to plan, finance, develop and acquire \ntransmission and storage projects (transmitting or storing at least 30% renewable energy) in order to promote \nthe development of renewable energy in New Mexico.  For purposes of this filing, SunZia Transmission is \nconsidered the Transmission Owner in interest of the Transmission System pursuant to the lease arrangement \ndescribed above. \n8  \nAllocation of Capacity on New Merchant Transmission Projects and New Cost-Based, Participant-Funded \nTransmission Projects; Priority Rights to New Participant-Funded Transmission, 142 FERC ¶ 61,038, P 16 \n(2013), recon. den’d, 142 FERC ¶ 61,213 (2013).  Capacity on the SunZia Transmission System has been \nallocated pursuant to two open solicitation processes both of which were filed with, reviewed and accepted by \nthe Commission.  See SunZia Transmission, LLC, 160 FERC ¶ 61,074 (2017); SunZia Transmission, LLC, 179 \nFERC ¶ 61,135 (2022). \n9  \nThe initial thirty-year term commenced on July 30, 2026.  Each of the SunZia Wind Companies has roll-over \nrights to continue service at the end of the initial term."},{"page":3,"startToken":874,"endToken":1436,"text":"The Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 3 of 7 \n4923-9080-5463.1 \ndated March 6, 2026 (the “TSAs”), both of which have been filed with and accepted for filing by \nthe Commission.10\nIn addition, the SunZia Wind Companies have acquired 2,131 MW of long-term, firm \npoint-to-point transmission service from the Pinal Central 500 kV Substation to the Palo Verde \n500 kV Hub (which interconnects to the CAISO-controlled transmission system) through a \nnumber of transmission service agreements with SRP (1,500 MW), the Desert Southwest Region \nof the Western Area Power Administration (“WAPA”) (300 MW), and Tucson Electric Power \nCompany (“TEP”) (331 MW) with initial terms ranging from five years to twenty years and, in \neach case with the SunZia Wind Companies having roll-over rights thereafter (collectively, the \n“Arizona Entitlements”).11  SunZia Transmission has obtained authorization from the SunZia \nWind Companies to administer the Arizona Entitlements (subject at all times to each SunZia \nWind Company’s right to use the Arizona Entitlements for the transmission of electricity to the \nPalo Verde Hub for the benefit of the SunZia Wind Projects) and to grant CAISO operational \ncontrol of the Arizona Entitlements consistent with the Transmission Rights and Curtailment \nInstructions that will be provided by SunZia Transmission consistent with applicable terms and \nconditions of the WAPA, SRP and TEP tariffs and business practices.  \nOn September 22, 2023, in Docket No. ER23-2917-000, the CAISO filed proposed \nrevisions to the CAISO Open Access Transmission Tariff (the “CAISO Tariff”) to implement a \nSubscriber Participating Transmission Owner  (“SPTO”)  model to facilitate access by merchant \nand participant-funded projects located outside of California to the CAISO transmission system, \nfurthering State and Federal goals of increasing access to out-of-state carbon-free generating \nresources.  The Commission accepted the CAISO’s proposed tariff changes by order issued \nMarch 12, 2024.12  On January 14, 2024, SunZia Transmission applied to become an SPTO and, \non May 23, 2024, the CAISO Board of Governors approved the SunZia Transmission \napplication.  As a result, when the Transmission System entered commercial operation in April \n9, 2026, operational control of the Transmission System and the Arizona Entitlements was \ngranted by SunZia Transmission to CAISO pursuant to the CAISO’s Transmission Control \nAgreement at which time the SunZia Transmission Open Access Transmission Tariff (“OATT”) \nwas withdrawn.13  As a result, the CAISO Tariff now governs future transmission and \ninterconnection service over the Transmission System (subject to the rights and obligations of \n10\nSunZia Transmission, LLC, Docket Nos. ER25-1636-000 and ER25-1637-000 (April 28, 2026) (unpublished \nletter order). \n11  \nThe SunZia Wind Companies have the right under the transmission tariffs of WAPA, SRP and TEP to request \na change in the Point of Delivery and/or Point of Receipt on either a firm or non-firm basis so that the \ntransmission service is redirectable consistent with the terms of the tariffs and business practices of the three \nArizona transmission providers. \n12  \nCalifornia Independent System Operator Corporation, 186 FERC ¶ 61,177 (2024). \n13\nSunZia Transmission, LLC, Docket No. ER26-2115-000 (June 4, 2026) (unpublished letter order).  The SunZia \nTransmission OATT was filed on June 15, 2023 in Docket No. ER23-2146-000 and accepted for filing by the \nCommission by order issued October 20, 2023.  SunZia Transmission, LLC, 185 FERC ¶ 61,052 (2023).  As \ndiscussed in note 14 infra, the SunZia Transmission OATT was subsequently modified to address SunZia \nTransmission’s transition to SPTO status under the CAISO Tariff."},{"page":4,"startToken":1436,"endToken":2082,"text":"The Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 4 of 7 \n4923-9080-5463.1 \nSunZia Transmission to the SunZia Wind Companies, the customers that are funding the \nconstruction of the Transmission System through their obligation to make transmission capacity \npayments under the TSAs).14\nOn October 21, 2024, SunZia Transmission filed with the Commission its proposed TO \nTariff pursuant to which its transmission facilities and contractual entitlements would be placed \nunder the operational control of CAISO and made available to provide transmission and \ninterconnection service under the CAISO Tariff.  By order issued April 17, 2025, the \nCommission accepted SunZia Transmission’s TO Tariff for filing, to become effective on the \ndate on which operational control of the transmission facilities and contractual entitlements of \nSunZia Transmission is granted to CAISO.15  The Commission found that the rates, terms and \nconditions of the proposed TO Tariff had been shown to be just and reasonable with one \nexception – the rate design used to calculate the Non-Subscriber Usage Rates set forth in the TO \nTariff.  On that issue, the Commission found that the filing raised issues of material fact that \ncannot be resolved based on the record before the Commission.16\n14\nDuring SunZia Transmission’s transition to SPTO status, SunZia Transmission and CAISO entered into an \nApplicant Participating Transmission Owner Agreement (the “APTOA”) pursuant to which the parties agreed \nthat the CAISO Tariff govern requests for interconnection with and transmission service over the Transmission \nSystem. The APTOA was filed by CAISO with the Commission on July 5, 2024 in Docket No. ER24-2471-\n000 and was accepted for filing by the Commission on September 3, 2024, and made effective on September 4, \n2024.  California Independent System Operator Corporation, 188 FERC ¶ 61,151 (2024).  On July 8, 2024, in \nDocket No. ER24-2473-000, SunZia Transmission filed revisions to its OATT to amend Sections 17 and 18 to \nnotify current and prospective customers that, upon the effective date of the APTOA, all requests for \ntransmission or interconnection service on the Transmission System will be processed by CAISO in \naccordance with the CAISO Tariff.  The SunZia Transmission OATT revisions were accepted for filing by the \nCommission on September 4, 2024, and to align with the APTOA, was made effective as of September 4, \n2024.  SunZia Transmission, LLC, Docket No. ER24-2473-000 (Sept. 4, 2024) (unpublished letter order). \n15\nSunZia Transmission, LLC, Order Accepting and Suspending Proposed Tariff Revisions, Subject to Refund \nand Establishing Hearing and Settlement Judge Procedures,191 FERC ¶ 61,053 (2025) (the “April 17 Order”).   \n16\nApril 17 Order at PP 54-55.  SunZia Transmission and the active participants in the proceeding thereafter \nreached an uncontested settlement on the NSUR rate design issue as well as additional NSUR issues that \nresulted in the filing on August 18, 2025 of an Offer of Settlement and Settlement Agreement with the \nCommission that was supported by the Trial Staff (see Docket No. ER25-170-000, Initial Comments by Trial \nStaff Supporting Offer of Settlement and Settlement Agreement (Sept. 8, 2025)) and certified by the Settlement \nJudge (see SunZia Transmission, LLC, 193 FERC ¶ 61,003, Certification of Uncontested Offer of Settlement \n(Oct. 3, 2025)).  The Commission approved the Offer of Settlement and Settlement Agreement by order issued \nJanuary 26, 2026.  SunZia Transmission, LLC, 194 FERC ¶ 61,069 (2026).  Following the filing of the Offer of \nSettlement and Settlement Agreement and prior to Commission approval, the Commission granted the request \nfor rehearing filed by three of the active participants and reversed its prior finding in the April 17 Order that \nthe structuring of the NSUR based on the Commission-accepted Subscriber transmission rates is just and \nreasonable.  SunZia Transmission, LLC, 193 FERC ¶ 61,176 (2025), reh’g req. dism’d, 194 FERC ¶ 61,140 \n(2026), appeal pending, SunZia Transmission, LLC v. Federal Energy Regulatory Commission, Case No. 26-\n1067 (D.C. Cir.).  Settlement negotiations on that issue among the active participants in the proceeding remain \non-going."},{"page":5,"startToken":2082,"endToken":2626,"text":"The Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 5 of 7 \n4923-9080-5463.1 \nSunZia Transmission is in a unique position with respect to its compliance with the \nCommission’s directives in the Order to Show Cause for several reasons.  First, SunZia \nTransmission does not directly serve load and, accordingly, there are no provisions in its TO \nTariff that address the interconnection of the load to the SunZia Transmission System.  As a \nresult, the SunZia Transmission TO Tariff is silent with respect to load interconnections and \nthere is no need to modify the Tariff to address the interconnection of large or co-located loads. \nSecond, the SunZia Transmission System is not located within the service territory of a load \nserving participating transmission owner within the CAISO market that is subject to the Order to \nShow Cause and that will be submitting tariff changes in response to the Order to Show Cause.  \nThe SunZia Transmission System is embedded within the service territories of Arizona and New \nMexico load-serving entities that are not subject to the Order to Show Cause or any of the other \nOrders to Show Cause issued to regional transmission operators or independent system operators \nthroughout the country.  Finally, Section 8 of the SunZia Transmission TO Tariff states that all \nrequests for interconnection to the SunZia Transmission System must be directed in the first \ninstance to CAISO with notice of such request being provided to SunZia Transmission.  Thus, \nCAISO is responsible for managing the generator interconnection process for the SunZia \nTransmission System with SunZia Transmission supporting that process through the undertaking \nof studies on the impact of the interconnection on the System. Any changes to the generation \ninterconnection process to facilitate the interconnection of co-located load to the transmission \nsystem must be set forth in the CAISO Tariff, in which case SunZia Transmission will propose \nconforming changes to its TO Tariff to remain consistent with the CAISO’s changes. \nII.\nDESCRIPTION OF FILING \nConsistent with the description above as to SunZia Transmission’s unique and limited \nrole in the interconnection process overall, Section 8 of the TO Tariff has been amended to \nclarify that the CAISO Tariff will continue to control with respect to the interconnection of \nGenerating Units, energy storage co-located with Large Load and Co-located Generating Units \nwith Large Loads.  In proposing these limited changes to its TO Tariff, SunZia Transmission \nreserves the right, following review of the proposed tariff changes filed by the other Participating \nTransmission Owners (“PTOs”) that are subject to the Commission’s Order to Show Cause, to \namend this filing to propose additional changes to ensure consistency among all similarly-\nsituated PTOs.   \nFinally, consistent with its comments made during the stakeholder process, SunZia \nTransmission continues to support the need to apply these enhanced Large Load interconnection \nprocedures to Electrically Proximate Loads.  CAISO has explained that the need for such \nchanges within the CAISO footprint in California will be addressed following the submission of \nthe Large Load compliance filing.  SunZia Transmission supports the commencement of that \neffort as soon as possible because the value proposition and the question surrounding how to \nstudy the interconnection of electrically proximate large load and generation in tandem (similar \nto co-located load and generation) are unique when applied to the SunZia Transmission System \nin New Mexico and Arizona."},{"page":6,"startToken":2626,"endToken":2970,"text":"The Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 6 of 7 \n4923-9080-5463.1 \nIII.\nATTACHMENTS TO FILING \nIncluded in this filing are the following documents: \n1. \nThis Transmittal Letter; \n2. \nClean version of the revised SunZia Transmission TO Tariff; and  \n3. \nMarked version of the revised SunZia Transmission TO Tariff, showing \nchanges against the currently-effective SunZia Transmission TO Tariff.17\nIV.\nPROPOSED EFFECTIVE DATE \nSunZia Transmission proposes an effective date of sixty days after the Commission \nissues an order on this compliance filing for the changes to its TO Tariff.  A period of sixty days \nafter the Commission approves this filing will allow enough time for SunZia Transmission to \nseamlessly transition to the new processes.  Because a precise effective date is not known at this \ntime, SunZia Transmission is submitting this filing with a 12/31/9998 effective date for the tariff \nrecords, and, if necessary, will make a compliance filing to apply the actual effective date once \nknown.   \nV.\nCOMMUNICATIONS \nCorrespondence and service regarding this filing should be sent to the following \nindividual: \nRobert L. Daileader \nNixon Peabody LLP \n799 Ninth Street, Suite 500 \nWashington, DC 20001 \n(202) 288-2069 \nrdaileader@nixonpeabody.com \nCameron Yourkowski \nDirector, Regulatory Affairs & Markets \nSunZia Transmission, LLC \n1088 Sansome Street \nSan Francisco, CA 94111 \n(503) 432-0982 \ncameron.yourkowski@patternenergy.com\nVI.\nCONCLUSION \nIn accordance with the foregoing, SunZia Transmission respectfully requests that the \nCommission accept the proposed revisions to its TO Tariff as just and reasonable and consistent \nwith its obligations under the Order to Show Cause and grant an effective date of sixty days after \nthe Commission’s order on this filing. \n17  \nOn April 10, 2026, SunZia Transmission filed in Docket No. ER25-170-005 a revised TO Tariff with the \nCommission with an April 9, 2026 effective date (the date on which operational control of the SunZia \nTransmission System was granted to CAISO) and incorporating the changes to the TO Tariff accepted by the \nCommission when it approved the Offer of Settlement on January 26, 2026.  SunZia Transmission, LLC, 194 \nFERC ¶ 61,069 (2026).  See note 16 supra."},{"page":7,"startToken":2970,"endToken":3010,"text":"The Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 7 of 7 \n4923-9080-5463.1 \nPlease direct any questions regarding this filing to the undersigned counsel. \nRespectfully submitted, \n/S/ Robert L. Daileader \nRobert L. Daileader \nCounsel to SunZia Transmission LLC \nAttachments"},{"page":8,"startToken":3010,"endToken":3021,"text":"4889-6591-0000.2 \nAttachment 1 \nSunZia Transmission, LLC \nRevised Transmission Owner Tariff"},{"page":9,"startToken":3021,"endToken":3047,"text":"SUNZIA TRANSMISSION, LLC                     \nFERC Electric Tariff Volume 2 \nFirst Revised Sheet No.  1 \nIssued by: ______________ \nIssued on: ______________ \nEffective ___________ \nSUNZIA TRANSMISSION, LLC \nFERC ELECTRIC TRANSMISSION OWNER TARIFF"},{"page":10,"startToken":3047,"endToken":3220,"text":"TABLE OF CONTENTS\n1.\nPreamble .............................................................................................................................................\n2.\nEffective Date .....................................................................................................................................\n2.1\nTermination............................................................................................................................\n3.\nTO Definitions ....................................................................................................................................\n3.1\nArizona Entitlements .............................................................................................................\n3.2\nCompleted Application Date..................................................................................................\n3.3\nCompleted Interconnection Application................................................................................\n3.4\nDirect Assignment Facilities..................................................................................................\n3.5\nProject Proponent...................................................................................................................\n3.6\nSubscriber ..............................................................................................................................\n3.7\nSubscriber Encumbrances......................................................................................................\n3.8\nSubscriber Rights...................................................................................................................\n3.9\nSubscription Agreement.........................................................................................................\n3.10\nSunZia Transmission .............................................................................................................\n3.11\nSunZia Transmission System.................................................................................................\n4.\nEligibility ............................................................................................................................................\n5.\nNon-Subscriber Usage Rate, Subscriber Cost Recovery and Transmission Rates.............................\n5.1\nNon-Subscriber Usage Rate...................................................................................................\n5.2\nSubscriber Cost Recovery......................................................................................................\n5.3\nTransmission Rate Recovery .................................................................................................\n5.4\nTransmission Rates for Subscriber Service ...........................................................................\n6.\nAncillary Services - Applicability and Charges..................................................................................\n7.\nBilling and Payment............................................................................................................................\n8.\nObligation to Interconnect or Construct Transmission Expansions and Facility Upgrades\n8.1\nParticipating TO Obligation to Interconnect..........................................................................\n9.\nExpansion Process for SunZia Transmission System and Arizona Entitlements...............................\n9.1\nExpansion Process .................................................................................................................\n10.\nInterconnection Process for SunZia Transmission’s Arizona Entitlements........................................\n10.1\nInterconnection Process .........................................................................................................\n10.2\nApplicability ..........................................................................................................................\n11.\nUncontrollable Forces and Indemnification........................................................................................\n11.1\nProcedures to Follow if Uncontrollable Force Occurs ..........................................................\n11.2\nIndemnification......................................................................................................................\n11.3\nOpen Access..........................................................................................................................."},{"page":11,"startToken":3220,"endToken":3280,"text":"12.\nRegulatory Filings...............................................................................................................................\n13.\nMiscellaneous .....................................................................................................................................\n13.1\nNotices ...................................................................................................................................\n13.2\nWaiver....................................................................................................................................\n13.3\nConfidentiality .......................................................................................................................\n13.4\nTO Tariff Supersedes Existing Tariffs...................................................................................\n13.5\nTitles ......................................................................................................................................\n13.6\nSeverability ............................................................................................................................\n13.7\nPreservation of Obligations....................................................................................................\n13.8\nGoverning Law ......................................................................................................................\n13.9\nAppendices Incorporated .......................................................................................................\n13.10\nConsistency with CAISO Tariff.............................................................................................\n13.11\nDisputes..................................................................................................................................\n13.12\nConflicting Dispatch and Operating Instructions ..................................................................\nAPPENDIX I\nAPPENDIX II"},{"page":12,"startToken":3280,"endToken":3823,"text":"SUNZIA TRANSMISSION, LLC \nFERC Electric Tariff Volume 2 \nFirst Revised Sheet No.  1\nEffective ______________ \n1.\nPreamble.  The terms and conditions pursuant to which the Regional Transmission Facilities and \nArizona Entitlements of SunZia Transmission, LLC (“SunZia Transmission”) placed under the \nCAISO’s Operational Control, including certain terms and conditions relating to transmission \nexpansion of and interconnection with SunZia Transmission’s Regional Transmission Facilities and \nArizona Entitlements placed under the CAISO’s Operational Control, are set forth in this TO Tariff \nand the CAISO Tariff.  SunZia Transmission offers long-term transmission service to subscribers \nat negotiated rates and offers other transmission service as provided in this TO Tariff, the \nTransmission Control Agreement (“TCA”) and the CAISO Tariff, as applicable.  For purposes of \nthis TO Tariff and the TCA, SunZia Transmission is a Non-Load-Service Participating TO and has \nno End-Use Customers. \n1.1\nTransmission Service for Long-Term Subscribers.  Long-term transmission service \nover the Regional Transmission System for one or more years is provided by SunZia \nTransmission following an open solicitation pursuant to FERC’s Policy Statement, \nAllocation of Capacity on New Merchant Transmission Projects and New Cost-based, \nParticipant-Funded Transmission, 142 FERC ¶ 61,038 (2013).  FERC accepted the \nresults of the two open solicitations in SunZia Transmission, LLC, Docket No.  ER17-\n388-000, 160 FERC ¶ 61,074 (2017) and SunZia Transmission, LLC, Docket No.  ER22-\n1208-000, 179 FERC ¶ 61,135 (2022).   \n1.1.1\nSubscriber Encumbrance.  Transmission capacity reserved for Subscriber \nService shall be treated as a Subscriber Encumbrance under the TCA.  \n1.2\nOther Transmission Service.  Transmission service, other than  Subscriber Service, \nover the Regional Transmission System and the Arizona Entitlements is provided under \nthe CAISO TCA.  The applicable Non-Subscriber Usage Rate shall be paid to the CAISO \npursuant to the CAISO Tariff.  \n2.\nEffective Date.  This TO Tariff is effective on the date on which SunZia Transmission becomes a \nParticipating TO under the CAISO Tariff and shall continue to be effective so long as SunZia \nTransmission is a party to the TCA. \n2.1\nTermination.  This TO Tariff may be terminated by SunZia Transmission upon such \nadvance notice consistent with the TCA and with such authorization as FERC may require. \n3.\nTO Definitions.  Certain capitalized terms used in this TO Tariff that are set out immediately below \nshall have the meanings set out immediately below.  Capitalized terms used in this TO Tariff and \nnot defined below shall have the meanings set out in the CAISO Tariff as it may be amended from \ntime to time. \n3.1\nArizona Entitlements.  As used in this TO Tariff, the term Arizona Entitlements shall have \nthe meaning set forth for the term “Entitlements” in the CAISO Tariff and shall include \nSubscriber’s transmission capacity rights under (i) the three Service Agreements Nos.  24-\nDSR-13271, 24-DSR-13272 and 24-DSR-13273 for firm point-to-point transmission \nservice, each dated as of December 13, 2023, and each by and among the Desert Southwest \nRegion of the Western Area Power Administration (“WAPA”) and Subscriber; (ii) (a) the \ntwo Service Agreement Nos.  479 and 480 in the aggregate for 193 MW of firm point-to-\npoint transmission service, each dated as of April 23, 2021, and each by and between \nTucson Electric Power Company (“TEP”) and Subscriber (as assignee of Pattern New \nMexico Wind LLC (“PNMW”) pursuant to Service Agreement No.  542 for the Transfer"},{"page":13,"startToken":3823,"endToken":4349,"text":"SUNZIA TRANSMISSION, LLC \nFERC Electric Tariff Volume 2 \nFirst Revised Sheet No.  2\nEffective ______________ \nof Firm Point-to-Point Transmission Service dated January 19, 2024, by and among TEP, \nPNMW, and Subscriber, as accepted for filing by FERC in Docket No.  ER24-1023-000 \non March 19, 2024), and (b) the three Service Agreement Nos.  499, 500, and 501 in the \naggregate for 138 MW of firm point-to-point transmission service, each dated as of April \n7, 2022, and each by and between TEP and Subscriber as assignee of PNMW pursuant to \nService Agreement No.  542 described in clause (ii)(a), and (c) the fourteen Service \nAgreements in the aggregate for 1500 MW firm point-to-point transmission service, each \ndated as of December 1, 2022, for Transmission Service Request Nos.  94729356, \n94729365, 94729400, 94729420, 94729424, 94729431, 94729441, 94729444, 94729447, \n94729525, 94729528, 94729532, 94729533 and 94729535, and each by and between the \nSalt River Project Agricultural Improvement and Power District (“SRP”) and Subscriber \n(as successor-in-interest to PNMW pursuant to the Agreement for the Transfer of Service \nAgreements dated December 12, 2023, by and among PNMW, Subscriber, and SRP \n(collectively, the “Arizona Transmission Rights,” as provided under items (i), (ii), and (iii) \nabove, collectively, the “Arizona TSAs”), of which Operational Control is conveyed to \nSunZia Transmission pursuant to the AZEA. \nThe utilization of Arizona Entitlements shall, at all times, be subject to and consistent with \nthe terms and conditions set forth in the respective Open Access Transmission Tariffs and \nassociated business practices of SRP, TEP and WAPA. Nothing in this TO Tariff expands \nthe rights of Subscriber, or a Non-Subscriber, in the Arizona Entitlements beyond that \nprovided in the Arizona TSAs and applicable Open Access Transmission Tariffs or business \npractices of SRP, TEP or WAPA.  \nThe CAISO will administer Operational Control of the Arizona Entitlements consistent \nwith the Transmission Rights and Curtailment Instructions provided by SunZia \nTransmission, which SunZia Transmission will ensure are in compliance with the terms \nand conditions set forth in the Arizona TSAs and applicable Open Access Transmission \nTariffs or business practices of SRP, TEP or WAPA. \n3.2\nCompleted Application Date.  The date on which a party submits an Interconnection \nApplication that satisfies the requirements of a Completed Interconnection Application. \n3.3\nCompleted Interconnection Application.  An application that satisfies all of the \ninformation and other requirements of the CAISO Tariff and this TO Tariff, including any \nrequired deposit \n3.4\nDirect Assignment Facilities.  Facilities or portions of facilities that are constructed by \nthe Participating TO for the sole use or benefit of a particular party requesting \nInterconnection under this TO Tariff.  Direct Assignment Facilities shall be specified in the \nInterconnection Agreement that governs service to such party. \n3.5\nProject Proponent.  A Market Participant or group of Market Participants that: \n(i) advocates a transmission addition or upgrade; (ii) is unwilling to pay the full cost of the \nproposed transmission addition and upgrade, and thus is not a Project Sponsor; and \n(iii) initiates proceedings under the CAISO ADR Procedures to determine the need for the \nproposed transmission addition or upgrade. \n3.6\nRegional Transmission Facilities.  For purposes of this TO Tariff, the Regional \nTransmission Facilities shall be the SunZia Transmission System."},{"page":14,"startToken":4349,"endToken":4908,"text":"SUNZIA TRANSMISSION, LLC \nFERC Electric Tariff Volume 2 \nFirst Revised Sheet No.  3\nEffective ______________ \n3.7\nSubscriber.  As used herein, the term Subscriber shall have the meaning set forth in the \nCAISO Tariff and shall include SunZia Wind PowerCo LLC (“SunZia PowerCo”) on \nbehalf of SunZia Wind North LLC and SunZia Wind South LLC.  In the event that SunZia \nPowerCo assigns its rights and obligations under one or more of the Subscriber \nEncumbrances or Arizona Entitlements to SunZia Wind North LLC and/or SunZia Wind \nSouth LLC or SunZia Wind North LLC and/or SunZia Wind South LLC assign such rights \nand obligations to one or more other assignees, such assignees shall be the Subscriber for \npurposes of this TO Tariff with respect to such assigned Subscriber Encumbrance or \nEntitlement, as applicable. \n3.8\nSubscriber Encumbrances.  As used in this TO Tariff, the term Subscriber Encumbrances \nshall have the meaning set forth in the CAISO Tariff and shall include SunZia \nTransmission’s obligations to the Subscriber as set forth in the (i) Amended and Restated \nTransmission Service Agreement dated September 1, 2023, between SunZia Transmission \nand Subscriber, as accepted by FERC in SunZia Transmission, LLC, Docket No.  ER23-\n2765-000 (unpublished letter order issued October 25, 2023), and as amended, restated, or \nsupplemented from time to time,  (the “TSA”), and (ii) the Arizona Entitlements Agreement \ndated July 5, 2024, between SunZia Transmission and Subscriber (“AZEA”), and as \namended, restated, or supplemented from time to time, which conveys to SunZia \nTransmission Operational Control of the Arizona Entitlements but subject to Subscriber’s \npriority rights to use the Arizona Entitlements and in compliance with the Arizona TSAs.   \n3.9\nSubscriber Rights.  For purposes of this TO Tariff, the term Subscriber Rights as used \nherein shall have the meaning set forth in the CAISO Tariff and shall include the rights and \nobligations of SunZia Transmission to Subscriber under the TSA and AZEA. \n3.10\nSubscriber Service.  The term Subscriber Service shall have the meaning ascribed to it \nunder Section 4 herein. \n3.11\nSubscription Agreement.  For purposes of this TO Tariff, the term Subscription \nAgreement as used herein shall have the meaning set forth in the CAISO Tariff and shall \ninclude the (i) TSA and (ii) AZEA. \n3.12\nSunZia Transmission.  SunZia Transmission is the Participating TO under this TO Tariff.\n3.13\nSunZia Transmission System.  The SunZia Transmission System is an approximately \n552-mile, bi-pole, high voltage direct current transmission line in New Mexico and Arizona \nwith a nominal transmission capacity of 3,021 MW (“SunZia Transmission System”).  The \nSunZia Transmission System consists of a 345 kV alternating current switching station in \nNew Mexico referred to as the Pete Heinrich Switching Station along with voltage source \nconverter stations at a nominal direct current voltage of ±525 kV with 2156 kcmil \n“Bluebird” conductors arranged in a three-conductor bundle for each of the two (2) pole \nconductors traversing the approximately 552-mile transmission line length.  Additionally, \nthe transmission towers include dedicated metallic return conductors insulated at 85 kV \nwhich are electrically bundled as two (2) 1590 kcmil “Lapwing” conductors but \ngeographically separated on the towers (i.e., split bundle).  The SunZia Transmission \nSystem includes two (2), 1,500 MW dynamic braking resistors in New Mexico and two \n~0.75-mile 500kV AC transmission lines to connect the SunZia Transmission System to \nthe Pinal Central substation in Pinal County, Arizona."},{"page":15,"startToken":4908,"endToken":5412,"text":"SUNZIA TRANSMISSION, LLC \nFERC Electric Tariff Volume 2 \nFirst Revised Sheet No.  4\nEffective ______________ \n4.\nEligibility.  Long-term firm transmission service over SunZia Transmission’s Regional \nTransmission Facilities placed under the CAISO’s Operational Control is provided by SunZia \nTransmission to Subscriber pursuant to the TSA.  Long-term transmission service over the Arizona \nEntitlements is provided by WAPA, TEP and SRP to Subscriber under the Arizona TSAs of which \noperational control is conveyed to SunZia Transmission pursuant to the AZEA.  The services to \nSubscriber over the Regional Transmission Facilities and the Arizona Entitlements shall be the \n“Subscriber Service”.  Transmission capacity reserved for Subscriber Service shall constitute a \nSubscriber Encumbrance under the TCA.  Transmission service other than Subscriber Service shall \nbe provided only to Eligible Customers pursuant to the TCA and the CAISO Tariff.   \n5.\nNon-Subscriber Usage Rate, Subscriber Cost Recovery and Transmission Rates.   \n5.1\nNon-Subscriber Usage Rate.  To the extent that the Regional Transmission Facilities or \nArizona Entitlements are used by a Non-Subscriber to provide transmission service under \nthe CAISO Tariff, the Non-Subscriber shall pay to the CAISO a Non-Subscriber Usage Fee \n($/MWh) in accordance with Appendix I. \n5.2\nSubscriber Cost Recovery.  The Subscriber has the right to recover lost production tax \ncredits and/or lost investment tax credits as interconnection-related outage costs and \nSunZia Transmission has the right to recover lost transmission revenue as interconnection-\nrelated outage costs with respect to the SunZia Transmission System, in both cases, as \naccepted by the FERC in SunZia Transmission, LLC, Order Accepting Tariff, Docket No.  \nER23-2146-001, 185 FERC ¶ 61,052 PP 25-26 (issued October 20, 2023). \n5.3\nTransmission Rate Recovery.  SunZia Transmission is entitled to all rights, including rate \nrecovery, associated with the SunZia Transmission System.   \n5.4\nTransmission Rates for Subscriber Service.  The rates for Subscriber Service are paid \noutside of the CAISO settlement systems. \n6.\nAncillary Services - Applicability and Charges.  If any Ancillary Services are required, SunZia \nTransmission will not provide such services directly to the transmission customer and the \ntransmission customer will be required to meet any such requirement in accordance with the \nCAISO Tariff. \n7.\nBilling and Payment. \n7.1\nThe CAISO, in accordance with the CAISO Tariff, shall pay the Participating TO, among \nother things, all applicable Non-Subscriber Usage Payments, including applicable Wheeling \nRevenues in accordance with the CAISO Tariff. \n7.2\nIf, subsequent to the initial build of the SunZia Transmission System, SunZia Transmission \nis ordered by the CAISO to construct, own and operate additional transmission facilities, then the \nCAISO in accordance with the CAISO Tariff, shall pay SunZia Transmission, among other things, \nall applicable FERC-approved Transmission Revenue Requirement in connection with the \nexpansion of the SunZia Transmission System consistent with Section 24 of the CAISO Tariff.   \n8.\nObligation to Interconnect or Construct Transmission Expansions and Facility Upgrades.  All \nrequests for interconnection with the SunZia Transmission System should be directed to the CAISO \nwith notice of such request provided to SunZia Transmission.  Interconnections under this TO Tariff \nshall be available to entities eligible to request Interconnection consistent with the provisions of"},{"page":16,"startToken":5412,"endToken":5979,"text":"SUNZIA TRANSMISSION, LLC \nFERC Electric Tariff Volume 2 \nFirst Revised Sheet No.  5\nEffective ______________ \nSection 210(a) of the Federal Power Act.  Expansion of and/or interconnection to the SunZia \nTransmission System presently placed under the CAISO’s Operational Control by SunZia \nTransmission by Generating Units, energy storage co-located with Large Loads and Co-located \nGenerating Units with Large Loads shall be governed by the CAISO Tariff.  The Arizona \nTransmission Rights placed under the Operational Control of CAISO by SunZia Transmission are \nArizona Entitlements that require the approval of the owners of those transmission facilities for \ninterconnection and SunZia Transmission does not have the legal authority to compel expansion or \ninterconnection to those facilities.  SunZia Transmission’s obligation to expand and/or interconnect \nthe SunZia Transmission System to load and/or to facilities providing wholesale transmission \nservice shall be determined in accordance with all applicable FERC and/or Local Regulatory \nAuthority requirements.   \n8.1\nParticipating TO Obligation to Interconnect.  This Section 8.1, 9.1, and 10.1, and their \nsubparts, are provided for consistency with the TO Tariffs of other PTOs and for potential \nfuture application should SunZia Transmission acquire transmission facilities or acquire \nadditional legal authority in its existing facilities that would provide SunZia Transmission \nsufficient legal authority to implement those Sections.  Sections 8.1, 9, and 10 and their \nsubparts have no current application to the Arizona Entitlements turned over to CAISO’s \nOperational Control by SunZia Transmission, which are covered solely by Section \n8(exclusive of Section 8.1 and its subparts) as to expansions and interconnections.   \n8.1.1\nInterconnection to Transmission System.  Interconnection must be consistent \nwith Good Utility Practice, in conformance with all Applicable Reliability Criteria, \nall applicable statutes, regulations and CAISO reliability criteria for the CAISO \nControlled Grid.  The Participating TO will not accommodate the Interconnection \nif doing so would impair system reliability or would otherwise adversely affect the \nability of the Participating TO to honor its Encumbrances existing as of the time a \nparty submits its Interconnection Application.  The Participating TO shall identify \nany such adverse effect on its Encumbrances in the Interconnection Study.  To the \nextent the Participating TO determines that the Interconnection will have an \nadverse effect on Encumbrances, the party requesting Interconnection shall \nmitigate such adverse effect. \n8.1.2\nCosts Associated with Interconnection.  Each party requesting Interconnection \nshall pay the costs of planning, installing, owning, operating, and maintaining any \nDirect Assignment Facilities and, if applicable, any Reliability Upgrades required \nto provide the requested Interconnection, except as provided in Appendix DD of \nthe CAISO Tariff, and any interconnection-related outage costs as accepted by \nFERC in Docket No. ER23-2146-001, SunZia Transmission, LLC, Order \nAccepting Tariff, 185 FERC ¶ 61,052 PP 25-26 (Oct.  20, 2023).  In addition, such \nparty shall implement all existing operating procedures necessary to safely and \nreliably interconnect such party’s facilities to the facilities of the Participating TO \nand to ensure the CAISO Controlled Grid’s conformance with the CAISO Grid \nPlanning Criteria, and shall bear all costs of implementing such operating \nprocedures.  Any additional costs associated with accommodating the \nInterconnection shall be allocated in accordance with the cost responsibility \nmethodology set forth in the CAISO Tariff for transmission expansions or \nupgrades or, for the expansion and/or interconnection of the SunZia Transmission \nSystem to provide service to load and/or to facilities providing wholesale \ntransmission service, in accordance with all applicable FERC and/or Local \nRegulatory Authority requirements."},{"page":17,"startToken":5979,"endToken":6499,"text":"SUNZIA TRANSMISSION, LLC \nFERC Electric Tariff Volume 2 \nFirst Revised Sheet No.  6\nEffective ______________ \n8.1.3\nInterconnection Agreement.  Pursuant to Section 13 of Appendix DD of the \nCAISO Tariff, the Participating TO will tender to such party an Interconnection \nAgreement.  The Interconnection Agreement will include, without limitation, cost \nresponsibilities and payment provisions for any engineering, equipment, \nconstruction, ownership, operation and maintenance costs for any Direct \nAssignment Facilities, any Reliability Upgrades, any Delivery Upgrades, if \napplicable, and for any other mitigation measures consistent with the CAISO \nTariff.  The Interconnection Agreement will set forth a payment schedule that \nenables the Participating TO to recover its costs consistent with the CAISO Tariff.  \nIf the applicant elects not to execute the Interconnection Agreement and does not \nrequest the Participating TO to file an unexecuted Interconnection Agreement, its \nCompleted Interconnection Application shall be deemed withdrawn.  To maintain \nits queue position, the applicant must timely comply with the interconnection \nrequirements of Appendix DD of the CAISO Tariff and Sections 8.1 and 10.1 and \nits subparts of this TO Tariff. \n8.1.4\nDue Diligence to Construct.  The Participating TO shall use due diligence to \nconstruct, within a reasonable time, any Direct Assignment Facilities and any \nNetwork Upgrades that it is obligated to construct pursuant to this TO Tariff and, \nas applicable, Section 24 and Appendix DD of the CAISO Tariff.  The Participating \nTO’s obligation to build will be subject to: (i) its ability, after making a good faith \neffort, to obtain any necessary approvals and property rights under applicable \nfederal, state, and local laws; (ii) the presence of a cost recovery mechanism with \ncost responsibility assigned in accordance with the CAISO Tariff or applicable \nFERC precedent; and (iii) a signed Interconnection Agreement or a signed \nEngineering and Procurement Agreement or, by mutual agreement of the parties, \nFERC acceptance for filing of an unexecuted Interconnection Agreement. \n8.1.5\nEnergization.  The Participating TO shall not be obligated to energize, nor shall \nthe applicant or wholesale load be entitled to have its Interconnection to the CAISO \nControlled Grid energized, unless and until an Interconnection Agreement has been \nexecuted, or filed at FERC pursuant to Section 8.1.3, and becomes effective and \nsuch applicant or wholesale load has demonstrated to the CAISO’s reasonable \nsatisfaction that it has complied with all of the requirements of the CAISO Tariff \nand the requirements of this TO Tariff. \n8.1.6\nCoordination with CAISO on Interconnection Requests.  The Participating TO \nshall coordinate with the CAISO, pursuant to the provisions of the TCA and \nCAISO Tariff. \n8.1.7\nParticipating TO Obligation to Construct Transmission Expansions or \nFacility Upgrades.  The Participating TO shall be obligated to build transmission \nadditions and facility upgrades where the Participating TO is obligated to construct \nor expand facilities in accordance with and subject to the limitations of Section 24 \nof the CAISO Tariff and this TO Tariff. \n8.1.8\nObligation to Construct.  A Participating TO shall not be obligated to construct \nor expand transmission facilities or system upgrades unless and until the conditions \nstated in Section 9.1.3.1 hereof have been satisfied."},{"page":18,"startToken":6499,"endToken":7021,"text":"SUNZIA TRANSMISSION, LLC \nFERC Electric Tariff Volume 2 \nFirst Revised Sheet No.  7\nEffective ______________ \n8.1.9\nRequest for FERC Deference Regarding Need Determination.  It is intended \nthat FERC grant substantial deference to the factual determinations of the CAISO \n(including the CAISO’s ADR Procedures), WECC, or the RTG coordinated \nplanning processes as to the need for or construction of a facility, the need for full \ncost recovery, and the allocation of costs. \n9.\nExpansion Process for SunZia Transmission System and Arizona Entitlements.  The expansion \nprocess related to the SunZia Transmission System where SunZia Transmission is the lead \nParticipating TO with respect to a required system expansion is set forth in Section 9.1 of this TO \nTariff.  The Expansion process for SunZia Transmission’s Arizona Entitlements to the Arizona \nTransmission Rights, which it has turned over to the Operational Control of the CAISO, is as stated \nin Section 8 above.  Section 9 and its subparts shall not currently apply to those Arizona \nEntitlements. \n9.1\nExpansion Process.  Unless SunZia Transmission is the lead Participating TO with respect \nto a required system expansion, the provisions of Section 9.1 of this TO Tariff, and its \nsubparts, shall have no application to Regional Transmission Facilities, Local Transmission \nFacilities, or the Arizona Entitlements turned over to the CAISO’s Operational Control by \nSunZia Transmission.  With respect to the expansion of the transmission facilities by one \nor more of the transmission owners providing the Arizona Transmission Rights, the \ncorresponding provisions of the open access transmission tariff of such transmission owner \nshall govern. \n9.1.1\nDetermination of Facilities.  A Participating TO shall perform a study in \naccordance with this Section where (1) the Participating TO is obligated to \nconstruct or expand facilities in accordance with Section 24 and Appendix DD of \nthe CAISO Tariff and this TO Tariff; (2) a Market Participant agrees to pay the \ncosts of the study and provides an Interconnection Request consistent with the \nrequirements of Appendix DD of the CAISO Tariff  \n9.1.2\nPayment of Study Cost \n9.1.2.1 Interconnection Customer to Pay for Interconnection Study.  Where \nan Interconnection Study and the need for the transmission addition or \nupgrade has not yet been established in accordance with the procedures \nestablished herein and the CAISO Tariff, the Interconnection Customer \nshall pay the cost of the Study consistent with the CAISO Tariff. \n9.1.2.2 Project Sponsor or Project Proponent to Pay for Interconnection \nStudy.  Where the facilities to be added or upgraded have been determined \nto be needed in accordance with the procedures established herein and the \nCAISO Tariff, the Project Sponsor, Project Proponent, or the CAISO \nrequesting the study shall pay in advance the reasonable cost of the \nInterconnection Study.   \n9.1.2.3 Principal Beneficiaries to Pay for Interconnection Study.  Where the \nfacilities to be added or upgraded have been determined to be needed and \nthe principal beneficiaries have been identified by the CAISO or through \nthe CAISO ADR Procedures in accordance with the CAISO Tariff, the \nProject Sponsor and the identified principal beneficiaries shall pay the \nreasonable cost of the Interconnection Study, in such proportions as may"},{"page":19,"startToken":7021,"endToken":7502,"text":"SUNZIA TRANSMISSION, LLC \nFERC Electric Tariff Volume 2 \nFirst Revised Sheet No.  8\nEffective ______________ \nbe agreed, or, failing agreement, as determined in accordance with the \nCAISO ADR Procedures. \n9.1.2.4 Payment Procedure.  Where an Interconnection Study is being conducted \npursuant to this TO Tariff, the Participating TO shall, within thirty days of \nreceipt of all reasonably required information, tender to the \nInterconnection Customer, Project Sponsor, Project Proponent, CAISO, or \nidentified principal beneficiaries, as the case may be, an Interconnection \nStudy agreement that defines the scope, content, assumptions, and terms \nof reference for such study, the estimated time required to complete it, and \nsuch other provisions as the parties may reasonably require and pursuant \nto which such Interconnection Customer, Project Sponsor, Project \nProponent, the CAISO, or identified principal beneficiaries agree to \nreimburse the Participating TO the reasonable cost of performing the \nrequired Interconnection Study.  If the Interconnection Customer, Project \nSponsor, Project Proponent, the CAISO, or identified principal \nbeneficiaries, as the case may be, agree to the terms of the Interconnection \nStudy agreement, they shall execute the Interconnection Study agreement \nand return it to the Participating TO within ten Business Days.  \nAlternatively, if the Interconnection Customer, Project Sponsor, Project \nProponent, the CAISO, or identified principal beneficiaries, as the case \nmay be, request the Participating TO to proceed with the Interconnection \nStudy and commit to abide by the terms, conditions, and cost assignments \nultimately determined under the CAISO ADR Procedures, including any \ndetermination by FERC or appeal of a FERC determination in accordance \nwith that process, the Participating TO shall promptly proceed with the \nInterconnection Study, and the parties shall submit the disputed terms for \nresolution under the CAISO’s ADR Procedures. \n9.1.2.5 Interconnection Study Procedures.  Where an Interconnection Study is \nbeing conducted pursuant to the CAISO Tariff, the terms and conditions \nfor such studies shall be in accordance with the CAISO Tariff, including \nAppendix DD.   \n9.1.3\nObligation to Build. \n9.1.3.1 Due Diligence to Construct.  The Participating TO shall use due diligence \nto construct, within a reasonable time, additions or upgrades to its \ntransmission system that it is obligated to construct pursuant to the CAISO \nTariff and this TO Tariff. \n9.1.3.2 Delay in Construction or Expansion.  If any event occurs that will \nmaterially affect the time for completion of new facilities, or the ability to \ncomplete them, the Participating TO shall promptly notify the CAISO with \nregard to facilities determined to be needed.  The Participating TO shall \nalso notify the Project Sponsor, Parties to the Generator Interconnection \nAgreement and the CAISO as the case may be.  In such circumstances, the \nParticipating TO shall, within thirty days of notifying such Project \nSponsor, Parties to the Interconnection Agreement, and the CAISO of such \ndelays, convene a technical meeting with such Project Sponsor, Parties to \nthe Generator Interconnection Agreement, and the CAISO to discuss the"},{"page":20,"startToken":7502,"endToken":7975,"text":"SUNZIA TRANSMISSION, LLC \nFERC Electric Tariff Volume 2 \nFirst Revised Sheet No.  9\nEffective ______________ \ncircumstances which have arisen and evaluate any options available.  The \nParticipating TO also shall make available to such Project Sponsor, Parties \nto the Interconnection Agreement, and the CAISO, as the case may be, \nstudies and work papers related to the cause and extent of the delay and \nthe Participating TO’s ability to complete the new facilities, including all \ninformation that is in the possession of the Participating TO that is \nreasonably needed to evaluate the alternatives. \n9.1.3.2.1\nAlternatives to the Original Facility Additions.  If the \nreview process of Section 9.1.3.2 determines that one or more \nalternatives exist to the originally planned construction project, \nthe Participating TO shall present such alternatives for \nconsideration to the Project Sponsor, Parties to the Generator \nInterconnection Agreement, and the CAISO, as the case may be.  \nIn the event the Participating TO concludes that no reasonable \nalternative exists to the originally planned addition or upgrade and \nthe Project Sponsor or Parties to the Interconnection Agreement \nor the CAISO disagree, the dispute shall be resolved pursuant to \nthe CAISO ADR Procedures. \n9.1.3.2.2\nRefund Obligation for Unfinished Facility Additions.  \nIf the Participating TO and the Project Sponsor, the CAISO, or \nParties to the Generator Interconnection Agreement, as the case \nmay be, mutually agree that no other reasonable alternatives exist, \nthe obligation to construct the requested additions or upgrades \nshall terminate and any deposit not yet applied toward the \nexpended project costs shall be returned with interest pursuant to \nFERC Section 35.19(a)(2)(iii).  However, the Project Sponsor and \nany identified principal beneficiaries, as the case may be, shall be \nresponsible for all costs prudently incurred by the Participating \nTO through the time the construction was suspended. \n9.1.4\nProvisions Relating To Transmission Construction On the Systems Of Other \nTOs. \n9.1.4.1 Responsibility for Third Party Additions.  A Participating TO shall not \nbe responsible for making arrangements for any engineering, permitting, \nand construction of any necessary transmission or distribution facilities \nadditions on the system(s) of any other entity or for obtaining any \nregulatory approval for such facilities.  The Participating TO shall \nundertake reasonable efforts through the coordinated planning process to \nassist in making such arrangements, including, without limitation, \nproviding any information or data required by such other electric system \npursuant to Good Utility Practice. \n9.1.4.2 Coordination of Third-Party System Additions.  Where transmission \nadditions or upgrades being built pursuant to the CAISO Tariff require \nadditions or upgrades on other systems, the Participating TO shall \ncoordinate construction on its own system with the construction required \nby others.  The Participating TO, after consultation with the CAISO, and \nthe Project Sponsor, as the case may be, may defer construction if the new"},{"page":21,"startToken":7975,"endToken":8554,"text":"SUNZIA TRANSMISSION, LLC \nFERC Electric Tariff Volume 2 \nFirst Revised Sheet No.  10\nEffective ______________ \ntransmission facilities on another system cannot be completed in a timely \nmanner.  The Participating TO shall notify such Project Sponsor, Parties to \nthe Generator Interconnection Agreement, and the CAISO, in writing of \nthe basis for any decision to defer construction and the specific problems \nwhich must be resolved before it will initiate or resume construction of the \nnew facilities.  Such Project Sponsor, Parties to the Participation \nAgreement, or the CAISO may challenge the decision in accordance with \nthe CAISO ADR Procedures. \n10.\nInterconnection Process for SunZia Transmission’s Arizona Entitlements.  The interconnection \nprocess for SunZia Transmission’s Arizona Entitlements in the Arizona Transmission Rights, which \nit has turned over to CAISO Operational Control, is as stated in Section 8 above.  Section 10, and \nits subparts, do not currently apply to those Arizona Entitlements. \n10.1\nInterconnection Process.  Unless SunZia Transmission is the lead Participating TO with \nrespect to a requested interconnection, the provisions of Section 10 of this TO Tariff, and \nits subparts, shall have no application to the Regional Transmission Facilities, Local \nTransmission Facilities, or Arizona Entitlements turned over to the CAISO’s Operational \nControl by SunZia Transmission and the corresponding provisions of the lead Participating \nTO’s TO Tariff shall govern.  All requests for interconnection with the Regional \nTransmission Facilities, Local Transmission Facilities, or Arizona Entitlements turned over \nto the CAISO’s Operational Control by SunZia Transmission shall be directed to the lead \nParticipating TO, with notice of the request provided to SunZia Transmission. \n10.2\nApplicability.  All requests for Interconnection directly to the CAISO Controlled Grid \nfrom parties eligible to request such Interconnection consistent with Section 210(a) of the \nFPA shall be processed pursuant to the CAISO Tariff. \n11.\nUncontrollable Forces and Indemnification. \n11.1\nProcedures to Follow if Uncontrollable Force Occurs.  In the event of the occurrence of \nan Uncontrollable Force which prevents a Party from performing any of its obligations \nunder this TO Tariff, such Party shall (i) immediately notify the other Parties in writing of \nthe occurrence of such Uncontrollable Force, (ii) not be entitled to suspend performance in \nany greater scope or longer duration than is required by the Uncontrollable Force, (iii) use \nits best efforts to mitigate the effects of such Uncontrollable Force, remedy its inability to \nperform, and resume full performance hereunder, (iv) keep the other Parties apprised of \nsuch efforts on a continual basis and (v) provide written notice of the resumption of \nperformance hereunder.  Notwithstanding any of the foregoing, the settlement of any strike, \nlockout, or labor dispute constituting an Uncontrollable Force shall be within the sole \ndiscretion of the Party to this TO Tariff involved in such strike, lockout, or labor dispute \nand the requirement that a Party must use its best efforts to remedy the cause of the \nUncontrollable Force and mitigate its effects and resume full performance hereunder shall \nnot apply to strikes, lockouts, or labor disputes.  No Party will be considered in default as \nto any obligation under this TO Tariff if prevented from fulfilling the obligation due to the \noccurrence of an Uncontrollable Force. \n11.2\nIndemnification.  A Market Participant shall at all times indemnify, defend, and save the \nParticipating TO harmless from any and all damages, losses, claims, (including claims and \nactions relating to injury or to death of any person or damage to property), demands, suits, \nrecoveries, costs and expenses, court costs, attorney fees, and all other obligations by or to"},{"page":22,"startToken":8554,"endToken":9127,"text":"SUNZIA TRANSMISSION, LLC \nFERC Electric Tariff Volume 2 \nFirst Revised Sheet No.  11\nEffective ______________ \nthird parties, arising out of or resulting from the Participating TO’s performance of its \nobligations under this TO Tariff on behalf of a Market Participant, except in cases of \nnegligence or intentional wrongdoing by the Participating TO. \n11.3\nOpen Access.  For purposes of the Stranded Cost Recovery available under Order Nos.  \n888 and 888-A, this Tariff, combined with the CAISO Tariff and wholesale distribution \naccess tariff, if any, shall be considered an open access tariff under FERC Order Nos.  888 \nand 888-A. \n12.\nRegulatory Filings.  Nothing contained herein shall be construed as affecting, in any way, the right \nof SunZia Transmission to unilaterally make application to FERC as it deems necessary and \nappropriate to revise its Non-Subscriber Usage Rate, or for a change in its terms and conditions, \nincluding changes in rate methodology, or for a change in designation of the Arizona Entitlements \nto be placed under the CAISO’s Operational Control, pursuant to the applicable FERC rules, \nregulations, policies, and governing statutes. \n13.\nMiscellaneous. \n13.1\nNotices.  Any notices, demand, or request in accordance with this TO Tariff, unless \notherwise provided in this TO Tariff, shall be in writing and shall be deemed properly \nserved, given, or made: (i) upon delivery if delivered in person, (ii) five days after deposit \nin the mail if sent by first class United States mail, postage prepaid, (iii) upon receipt of \nconfirmation by return email, or (iv) upon delivery if delivered by prepaid commercial \ncourier service, in each case addressed to a Party at the address set forth in Appendix III.  \nAny Party may at any time, by notice to the other Parties, change the designation or address \nof the person specified in Appendix II to receive notice on its behalf.  Any notice of a \nroutine character in connection with service under this TO Tariff shall be given in such a \nmanner as the Parties may determine from time to time, unless otherwise provided in this \nTO Tariff. \n13.2\nWaiver.  Any waiver at any time by any Party of its rights with respect to any default under \nthis TO Tariff, or with respect to any other matter arising in connection with this TO Tariff, \nshall not constitute or be deemed a waiver with respect to any subsequent default or other \nmatter arising in connection with this TO Tariff.  Any delay short of the statutory period of \nlimitations in asserting or enforcing any right shall not constitute or be deemed a waiver. \n13.3\nConfidentiality. \n13.3.1 Maintaining Confidentiality if Not for Public Disclosure.  The Participating TO \nshall maintain the confidentiality of all of the documents, data, and information \nprovided to it by any other Party that such Party may designate as confidential, \nprovided, however, that the information will not be held confidential by the \nreceiving Party if (1) the designating Party is required to provide such information \nfor public disclosure pursuant to this TO Tariff or applicable regulatory \nrequirements, or (2) the information becomes available to the public on a non-\nconfidential basis (other than from the receiving Party). \n13.3.2 Disclosure of Confidential Information.  Notwithstanding anything in this \nSection 13.3.2 to the contrary, if any Party is required by applicable laws or \nregulations, or in the course of administrative or judicial proceedings, to disclose \ninformation that is otherwise required to be maintained in confidence pursuant to"},{"page":23,"startToken":9127,"endToken":9705,"text":"SUNZIA TRANSMISSION, LLC \nFERC Electric Tariff Volume 2 \nFirst Revised Sheet No.  12\nEffective ______________ \nthis Section 13.3.2, the Party may disclose such information; provided, however, \nthat as soon as such Party learns of the disclosure requirement and prior to making \nsuch disclosure, such Party shall notify the affected Party or Parties of the \nrequirement and the terms thereof The affected Party or Parties may, at their sole \ndiscretion and own costs, direct any challenge to or defense against the disclosure \nrequirement and the disclosing Party shall cooperate with such affected Party or \nParties to the maximum extent practicable to minimize the disclosure of the \ninformation consistent with applicable law.  The disclosing Party shall cooperate \nwith the affected Parties to obtain proprietary or confidential treatment of \nconfidential information by the person to whom such information is disclosed prior \nto any such disclosure. \n13.4\nTO Tariff Supersedes Existing Tariffs.  Upon the filing of this TO Tariff at FERC and \nFERC’s acceptance of such TO Tariff for filing and FERC’s acceptance of the withdrawal \nof SunZia Transmission’s open access transmission tariff as accepted by FERC in Docket \nNo. ER23-2146-001, SunZia Transmission, LLC, Order Accepting Tariff, 185 FERC ¶ \n61,052 (Oct. 20, 2023), this TO Tariff, together with the CAISO Tariff and wholesale \ndistribution access tariff if any, supersedes any pre-existing open access transmission tariff \nof the Participating TO.\n13.5\nTitles.  The captions and headings in this TO Tariff are inserted solely to facilitate reference \nand shall have no bearing upon the interpretation of any of the rates, terms, and conditions \nof this TO Tariff. \n13.6\nSeverability.  If any term, covenant, or condition of this TO Tariff or the application or \neffect of any such term, covenant, or condition is held invalid as to any person, entity, or \ncircumstance, or is determined to be unjust, unreasonable, unlawful, imprudent, or \notherwise not in the public interest, by any court or government agency of competent \njurisdiction, then such term, covenant, or condition shall remain in force and effect to the \nmaximum extent permitted by law, and all other terms, covenants, and conditions of this \nTO Tariff and their application shall not be affected thereby but shall remain in force and \neffect.  The Parties shall be relieved of their obligations only to the extent necessary to \neliminate such regulatory or other determination, unless a court or governmental agency of \ncompetent jurisdiction holds that such provisions are not severable from all other \nprovisions of this TO Tariff. \n13.7\nPreservation of Obligations.  Upon termination of this TO Tariff, all unsatisfied \nobligations of each Party shall be preserved until satisfied. \n13.8\nGoverning Law.  This TO Tariff shall be interpreted, governed by, and construed under \nthe laws of the State of California, without regard to the principles of conflict of laws \nthereof, or the laws of the United States, as applicable, as if executed and to be performed \nwholly within the State of California. \n13.9\nAppendices Incorporated.  The appendices to this TO Tariff are attached to this TO Tariff \nand are incorporated by reference as if fully set forth herein. \n13.10\nConsistency with CAISO Tariff.  This TO Tariff, with the exception of Section 5.2, is \nintended to be consistent with the CAISO Tariff, and, if necessary, shall be amended to \nconform with any changes authorized or required in any final order in a FERC proceeding \nmandating such changes in the CAISO Tariff.  If a Market Participant identifies a conflict"},{"page":24,"startToken":9705,"endToken":9964,"text":"SUNZIA TRANSMISSION, LLC \nFERC Electric Tariff Volume 2 \nFirst Revised Sheet No.  13\nEffective ______________ \nbetween the TO Tariff and the CAISO Tariff other than Section 5.2 of this TO Tariff, the \nParticipating TO and the Market Participant shall make good-faith efforts to resolve the \nconflict.  If the Parties are unable to informally resolve that conflict, the Parties may use \nthe CAISO ADR Procedures to resolve it as set forth in Section 13.11 of this Tariff. \n13.11\nDisputes.  Except as limited by law, the CAISO ADR Procedures shall apply to all disputes \nbetween parties which arise under this TO Tariff.  The CAISO ADR Procedures set forth \nin Section 13 of the CAISO Tariff shall not apply to disputes as to whether rates and charges \nset forth in this TO Tariff (other than charges for studies) are just and reasonable under the \nFPA. \n13.12\nConflicting Dispatch and Operating Instructions.  In the event a Market Participant \nreceives conflicting dispatch or operating instructions from the CAISO and one or more \nParticipating TO(s), if human safety would not knowingly be neither jeopardized nor \nelectric facilities subject to damage while the Market Participant seeks to reconcile the \nconflict with the appropriate CAISO and Participating TO employees before acting, the \nMarket Participant should attempt a reconciliation.  Otherwise, the Market Participant shall \nadhere to the CAISO Tariff Section 4.2 and follow the CAISO’s instructions.  In no event \nshall a Market Participant be required to follow dispatch or operating instructions from the \nCAISO if following those instructions would knowingly jeopardize human safety."},{"page":25,"startToken":9964,"endToken":10559,"text":"SUNZIA TRANSMISSION, LLC \nFERC Electric Tariff Volume 2 \nFirst Revised Sheet No.  1\nEffective ______________ \nAPPENDIX I \nNon-Subscriber Usage Rates  \nThe Generation COD Date shall occur on the commercial operation date of the last generating unit \nof the SunZia Transmission Subscriber that is interconnected to the SunZia Transmission System \nwhich generating unit is entitled to schedule energy delivery over the SunZia Transmission System \nusing Subscriber Rights.   \nNon-Subscriber Usage Rate for the SunZia Transmission System Only (Pete Heinrich to Pinal \nCentral) – As of the Grant of Operational Control to CAISO:  \nFor the period commencing on the grant of operational control of the SunZia Transmission System \nto CAISO and the subsequent two-year period following the Generation COD Date and in \naccordance with the CAISO Tariff, the Non-Subscriber Usage Rate for both import and export \ntransactions over the SunZia Transmission System shall be set at $0.00 per MWh.  For the one-year \nperiod beginning on the second anniversary of the Generation COD Date and in accordance with \nthe CAISO Tariff, the Non-Subscriber Usage Rate for both import and export transactions over the \nSunZia Transmission System shall be set at $2.0775 per kW/month (which increases annually by \none-half of one percent (0.5%) commencing on the date on which operational control of the SunZia \nTransmission System is granted to CAISO) converted to an annual rate (i.e., multiplying by twelve) \nand then divided by 8,760 hours to derive an hourly off-peak rate for use of the SunZia \nTransmission System by Non-Subscribers.  Commencing on the third anniversary of the Generation \nCOD Date and in accordance with the CAISO Tariff, the Non-Subscriber Usage Rate for both \nimport and export transactions over the SunZia Transmission System shall be the current monthly \npoint-to-point transmission rate charged by SunZia Transmission for use of the SunZia \nTransmission System by Subscribers in the TSA, as amended, supplemented, or restated from time \nto time and as accepted by the Commission (which increases annually by one-half of one percent \n(0.5%) commencing on the date on which operational control of the SunZia Transmission System \nis granted to CAISO), converted to an annual rate (i.e., multiplying by twelve) and then divided by \n8,760 hours to derive an hourly off-peak rate for use of the SunZia Transmission System by Non-\nSubscribers.  In no event shall the Non-Subscriber Usage Rate for the use of the SunZia \nTransmission System exceed the applicable CAISO Regional Access Charge in effect at the time \nservice is provided to the Non-Subscriber. \nNon-Subscriber Usage Rate for the Arizona Transmission Rights Only (Pinal Central to Palo \nVerde) – As of the Grant of Operational Control to CAISO: \nFor the period commencing on the grant of operational control of the Arizona Entitlements to \nCAISO and in accordance with the CAISO Tariff, the Non-Subscriber Usage Rate for the Arizona \nTransmission Rights shall be the weighted average (weighted by the amount of firm point-to-point \ntransmission service held as an Arizona Entitlement by SunZia Transmission) of the current firm, \nmonthly point-to-point transmission rates of WAPA, SRP and TEP, as shown on the Open Access \nSame-Time Information System (“OASIS”) of each transmission provider, converted to an annual \nrate (i.e., multiplying by twelve) and then divided by 8,760 hours to derive an hourly off-peak rate \nfor use of the Arizona Transmission Rights by Non-Subscribers plus the actual Schedule 1 and 2 \ncharges imposed by WAPA, SRP and TEP.  In no event shall the Non-Subscriber Usage Rate for \nthe Arizona Transmission Rights exceed the applicable CAISO Regional Access Charge in effect \nat the time service is provided to the Non-Subscriber."},{"page":26,"startToken":10559,"endToken":10688,"text":"SUNZIA TRANSMISSION, LLC \nFERC Electric Tariff Volume 2 \nFirst Revised Sheet No.  2\nEffective ______________ \nNon-Subscriber Usage Rate for Combined Segments of SunZia Transmission System and \nArizona Transmission Rights (Pete Heinrich to Palo Verde) – As of the Grant of Operational \nControl to CAISO: \nThe Non-Subscriber Usage Rate for the combined segments of the SunZia Transmission System \nand the Arizona Transmission Rights shall be the sum of the Non-Subscriber Usage Rates for each \nrespective segment, as defined above, but such Non-Subscriber Usage Rate shall not exceed the \napplicable CAISO Regional Access Charge in effect at the time service is provided to the Non-\nSubscriber.   \nThe currently-effective components used in the calculation of the Non-Subscriber Usage Rates as \nsuch components change from time to time will be publicly posted on CAISO’s website."},{"page":27,"startToken":10688,"endToken":10750,"text":"SUNZIA TRANSMISSION, LLC \nFERC Electric Tariff Volume 1 \nFirst Revised Sheet No.  1\nEffective ______________ \nAPPENDIX II \nNOTICES \nDesignated Representative: \nDeral Danis \nVice President, Transmission  \n200 South Wacker, Suite 1650 \nChicago, IL 60606 \nTel.  No.  (312) 259-9989 \nEmail Address: deral.danis@patternenergy.com \nAlternate Representative: \nGeneral Counsel \nPattern Energy Group LP \n1088 Sansome Street \nSan Francisco, CA 94111 \nEmail Address: generalcounsel@patternenergy.com"},{"page":28,"startToken":10750,"endToken":10770,"text":"4889-6591-0000.2 \nAttachment 2 \nSuZia Transmission, LLC \nBlack-line of Revised Transmission Owner Tariff Showing  \nChanges from As-Filed Transmission Owner Tariff"},{"page":29,"startToken":10770,"endToken":10796,"text":"SUNZIA TRANSMISSION, LLC\nFERC Electric Tariff Volume 2\nFirst Revised Sheet No.  1\nSUNZIA TRANSMISSION, LLC\nFERC ELECTRIC TRANSMISSION OWNER TARIFF\nIssued by: ______________\nIssued on: ______________\nEffective ___________"},{"page":30,"startToken":10796,"endToken":10969,"text":"TABLE OF CONTENTS\n1.\nPreamble .............................................................................................................................................\n2.\nEffective Date .....................................................................................................................................\n2.1\nTermination............................................................................................................................\n3.\nTO Definitions ....................................................................................................................................\n3.1\nArizona Entitlements .............................................................................................................\n3.2\nCompleted Application Date..................................................................................................\n3.3\nCompleted Interconnection Application................................................................................\n3.4\nDirect Assignment Facilities..................................................................................................\n3.5\nProject Proponent...................................................................................................................\n3.6\nSubscriber ..............................................................................................................................\n3.7\nSubscriber Encumbrances......................................................................................................\n3.8\nSubscriber Rights...................................................................................................................\n3.9\nSubscription Agreement.........................................................................................................\n3.10\nSunZia Transmission .............................................................................................................\n3.11\nSunZia Transmission System.................................................................................................\n4.\nEligibility ............................................................................................................................................\n5.\nNon-Subscriber Usage Rate, Subscriber Cost Recovery and Transmission Rates.............................\n5.1\nNon-Subscriber Usage Rate...................................................................................................\n5.2\nSubscriber Cost Recovery......................................................................................................\n5.3\nTransmission Rate Recovery .................................................................................................\n5.4\nTransmission Rates for Subscriber Service ...........................................................................\n6.\nAncillary Services - Applicability and Charges..................................................................................\n7.\nBilling and Payment............................................................................................................................\n8.\nObligation to Interconnect or Construct Transmission Expansions and Facility Upgrades\n8.1\nParticipating TO Obligation to Interconnect..........................................................................\n9.\nExpansion Process for SunZia Transmission System and Arizona Entitlements...............................\n9.1\nExpansion Process .................................................................................................................\n10.\nInterconnection Process for SunZia Transmission’s Arizona Entitlements........................................\n10.1\nInterconnection Process .........................................................................................................\n10.2\nApplicability ..........................................................................................................................\n11.\nUncontrollable Forces and Indemnification........................................................................................\n11.1\nProcedures to Follow if Uncontrollable Force Occurs ..........................................................\n11.2\nIndemnification......................................................................................................................\n11.3\nOpen Access..........................................................................................................................."},{"page":31,"startToken":10969,"endToken":11029,"text":"12.\nRegulatory Filings...............................................................................................................................\n13.\nMiscellaneous .....................................................................................................................................\n13.1\nNotices ...................................................................................................................................\n13.2\nWaiver....................................................................................................................................\n13.3\nConfidentiality .......................................................................................................................\n13.4\nTO Tariff Supersedes Existing Tariffs...................................................................................\n13.5\nTitles ......................................................................................................................................\n13.6\nSeverability ............................................................................................................................\n13.7\nPreservation of Obligations....................................................................................................\n13.8\nGoverning Law ......................................................................................................................\n13.9\nAppendices Incorporated .......................................................................................................\n13.10\nConsistency with CAISO Tariff.............................................................................................\n13.11\nDisputes..................................................................................................................................\n13.12\nConflicting Dispatch and Operating Instructions ..................................................................\nAPPENDIX I\nAPPENDIX II"},{"page":32,"startToken":11029,"endToken":11551,"text":"SUNZIA TRANSMISSION, LLC\nFERC Electric Tariff Volume 2\nFirst Revised Sheet No.  1\n1.\nPreamble.  The terms and conditions pursuant to which the Regional Transmission Facilities and\nArizona Entitlements of SunZia Transmission, LLC (“SunZia Transmission”) placed under the\nCAISO’s Operational Control, including certain terms and conditions relating to transmission\nexpansion of and interconnection with SunZia Transmission’s Regional Transmission Facilities\nand Arizona Entitlements placed under the CAISO’s Operational Control, are set forth in this TO\nTariff and the CAISO Tariff.  SunZia Transmission offers long-term transmission service to\nsubscribers at negotiated rates and offers other transmission service as provided in this TO\nTariff, the Transmission Control Agreement (“TCA”) and the CAISO Tariff, as applicable.  For\npurposes of this TO Tariff and the TCA, SunZia Transmission is a Non-Load-Service\nParticipating TO and has no End-Use Customers.\n1.1\nTransmission Service for Long-Term Subscribers. Long-term transmission service\nover the Regional Transmission System for one or more years is provided by SunZia\nTransmission following an open solicitation pursuant to FERC’s Policy Statement,\nAllocation of Capacity on New Merchant Transmission Projects and New Cost-based,\nParticipant-Funded Transmission, 142 FERC ¶ 61,038 (2013).  FERC accepted the\nresults of the two open solicitations in SunZia Transmission, LLC, Docket No.\nER17-388-000, 160 FERC ¶ 61,074 (2017) and SunZia Transmission, LLC, Docket\nNo.  ER22-1208-000, 179 FERC ¶ 61,135 (2022).\n1.1.1\nSubscriber Encumbrance. Transmission capacity reserved for Subscriber\nService shall be treated as a Subscriber Encumbrance under the TCA.\n1.2\nOther Transmission Service. Transmission service, other than  Subscriber Service,\nover the Regional Transmission System and the Arizona Entitlements is provided\nunder the CAISO TCA.  The applicable Non-Subscriber Usage Rate shall be paid to\nthe CAISO pursuant to the CAISO Tariff.\n2.\nEffective Date.  This TO Tariff is effective on the date on which SunZia Transmission becomes\na Participating TO under the CAISO Tariff and shall continue to be effective so long as SunZia\nTransmission is a party to the TCA.\n2.1\nTermination.  This TO Tariff may be terminated by SunZia Transmission upon such\nadvance notice consistent with the TCA and with such authorization as FERC may\nrequire.\n3.\nTO Definitions.  Certain capitalized terms used in this TO Tariff that are set out immediately\nbelow shall have the meanings set out immediately below.  Capitalized terms used in this TO\nTariff and not defined below shall have the meanings set out in the CAISO Tariff as it may be\namended from time to time.\n3.1\nArizona Entitlements. As used in this TO Tariff, the term Arizona Entitlements shall\nhave the meaning set forth for the term “Entitlements” in the CAISO Tariff and shall\ninclude Subscriber’s transmission capacity rights under (i) the three Service Agreements\nNos.  24-DSR-13271, 24-DSR-13272 and 24-DSR-13273 for firm point-to-point\ntransmission service, each dated as of December 13, 2023, and each by and among the\nDesert Southwest Region of the Western Area Power Administration (“WAPA”) and\nSubscriber; (ii) (a) the two Service Agreement Nos.  479 and 480 in the aggregate for\n193 MW of firm point-to-point transmission service, each dated as of April 23, 2021, and\neach by and between Tucson Electric Power Company (“TEP”) and Subscriber (as\nEffective ______________"},{"page":33,"startToken":11551,"endToken":12073,"text":"SUNZIA TRANSMISSION, LLC\nFERC Electric Tariff Volume 2\nFirst Revised Sheet No.  2\nassignee of Pattern New Mexico Wind LLC (“PNMW”) pursuant to Service Agreement\nNo.  542 for the Transfer of Firm Point-to-Point Transmission Service dated January 19,\n2024, by and among TEP, PNMW, and Subscriber, as accepted for filing by FERC in\nDocket No.  ER24-1023-000 on March 19, 2024), and (b) the three Service Agreement\nNos.  499, 500, and 501 in the aggregate for 138 MW of firm point-to-point transmission\nservice, each dated as of April 7, 2022, and each by and between TEP and Subscriber as\nassignee of PNMW pursuant to Service Agreement No.  542 described in clause (ii)(a),\nand (c) the fourteen Service Agreements in the aggregate for 1500 MW firm\npoint-to-point transmission service, each dated as of December 1, 2022, for Transmission\nService Request Nos.  94729356, 94729365, 94729400, 94729420, 94729424, 94729431,\n94729441, 94729444, 94729447, 94729525, 94729528, 94729532, 94729533 and\n94729535, and each by and between the Salt River Project Agricultural Improvement and\nPower District (“SRP”) and Subscriber (as successor-in-interest to PNMW pursuant to\nthe Agreement for the Transfer of Service Agreements dated December 12, 2023, by and\namong PNMW, Subscriber, and SRP (collectively, the “Arizona Transmission Rights,”\nas provided under items (i), (ii), and (iii) above, collectively, the “Arizona TSAs”), of\nwhich Operational Control is conveyed to SunZia Transmission pursuant to the AZEA.\nThe utilization of Arizona Entitlements shall, at all times, be subject to and consistent\nwith the terms and conditions set forth in the respective Open Access Transmission\nTariffs and associated business practices of SRP, TEP and WAPA. Nothing in this TO\nTariff expands the rights of Subscriber, or a Non-Subscriber, in the Arizona Entitlements\nbeyond that provided in the Arizona TSAs and applicable Open Access Transmission\nTariffs or business practices of SRP, TEP or WAPA.\nThe CAISO will administer Operational Control of the Arizona Entitlements consistent\nwith the Transmission Rights and Curtailment Instructions provided by SunZia\nTransmission, which SunZia Transmission will ensure are in compliance with the terms\nand conditions set forth in the Arizona TSAs and applicable Open Access Transmission\nTariffs or business practices of SRP, TEP or WAPA.\n3.2\nCompleted Application Date.  The date on which a party submits an Interconnection\nApplication that satisfies the requirements of a Completed Interconnection Application.\n3.3\nCompleted Interconnection Application.  An application that satisfies all of the\ninformation and other requirements of the CAISO Tariff and this TO Tariff, including\nany required deposit\n3.4\nDirect Assignment Facilities.  Facilities or portions of facilities that are constructed by\nthe Participating TO for the sole use or benefit of a particular party requesting\nInterconnection under this TO Tariff.  Direct Assignment Facilities shall be specified in\nthe Interconnection Agreement that governs service to such party.\n3.5\nProject Proponent.  A Market Participant or group of Market Participants that:\n(i) advocates a transmission addition or upgrade; (ii) is unwilling to pay the full cost of\nthe proposed transmission addition and upgrade, and thus is not a Project Sponsor; and\n(iii) initiates proceedings under the CAISO ADR Procedures to determine the need for\nthe proposed transmission addition or upgrade.\nEffective ______________"},{"page":34,"startToken":12073,"endToken":12613,"text":"SUNZIA TRANSMISSION, LLC\nFERC Electric Tariff Volume 2\nFirst Revised Sheet No.  3\n3.6\nRegional Transmission Facilities.  For purposes of this TO Tariff, the Regional\nTransmission Facilities shall be the SunZia Transmission System.\n3.7\nSubscriber.  As used herein, the term Subscriber shall have the meaning set forth in the\nCAISO Tariff and shall include SunZia Wind PowerCo LLC (“SunZia PowerCo”) on\nbehalf of SunZia Wind North LLC and SunZia Wind South LLC.  In the event that\nSunZia PowerCo assigns its rights and obligations under one or more of the Subscriber\nEncumbrances or Arizona Entitlements to SunZia Wind North LLC and/or SunZia Wind\nSouth LLC or SunZia Wind North LLC and/or SunZia Wind South LLC assign such\nrights and obligations to one or more other assignees, such assignees shall be the\nSubscriber for purposes of this TO Tariff with respect to such assigned Subscriber\nEncumbrance or Entitlement, as applicable.\n3.8\nSubscriber Encumbrances.  As used in this TO Tariff, the term Subscriber\nEncumbrances shall have the meaning set forth in the CAISO Tariff and shall include\nSunZia Transmission’s obligations to the Subscriber as set forth in the (i) Amended and\nRestated Transmission Service Agreement dated September 1, 2023, between SunZia\nTransmission and Subscriber, as accepted by FERC in SunZia Transmission, LLC,\nDocket No.  ER23-2765-000 (unpublished letter order issued October 25, 2023), and as\namended, restated, or supplemented from time to time,  (the “TSA”), and (ii) the Arizona\nEntitlements Agreement dated July 5, 2024, between SunZia Transmission and\nSubscriber (“AZEA”), and as amended, restated, or supplemented from time to time,\nwhich conveys to SunZia Transmission Operational Control of the Arizona Entitlements\nbut subject to Subscriber’s priority rights to use the Arizona Entitlements and in\ncompliance with the Arizona TSAs.\n3.9\nSubscriber Rights.  For purposes of this TO Tariff, the term Subscriber Rights as used\nherein shall have the meaning set forth in the CAISO Tariff and shall include the rights\nand obligations of SunZia Transmission to Subscriber under the TSA and AZEA.\n3.10\nSubscriber Service.  The term Subscriber Service shall have the meaning ascribed to it\nunder Section 4 herein.\n3.11\nSubscription Agreement.\nFor purposes of this TO Tariff, the term Subscription\nAgreement as used herein shall have the meaning set forth in the CAISO Tariff and shall\ninclude the (i) TSA and (ii) AZEA.\n3.12\nSunZia Transmission.\nSunZia Transmission is the Participating TO under this TO\nTariff.\n3.13\nSunZia Transmission System.  The SunZia Transmission System is an approximately\n552-mile, bi-pole, high voltage direct current transmission line in New Mexico and\nArizona with a nominal transmission capacity of 3,021 MW (“SunZia Transmission\nSystem”).  The SunZia Transmission System consists of a 345 kV alternating current\nswitching station in New Mexico referred to as the Pete Heinrich Switching Station\nalong with voltage source converter stations at a nominal direct current voltage of ±525\nkV with 2156 kcmil “Bluebird” conductors arranged in a three-conductor bundle for each\nof the two (2) pole conductors traversing the approximately 552-mile transmission line\nlength.  Additionally, the transmission towers include dedicated metallic return\nconductors insulated at 85 kV which are electrically bundled as two (2) 1590 kcmil\n“Lapwing” conductors but geographically separated on the towers (i.e., split bundle).\nEffective ______________"},{"page":35,"startToken":12613,"endToken":13084,"text":"SUNZIA TRANSMISSION, LLC\nFERC Electric Tariff Volume 2\nFirst Revised Sheet No.  4\nThe SunZia Transmission System includes two (2), 1,500 MW dynamic braking resistors\nin New Mexico and two ~0.75-mile 500kV AC transmission lines to connect the SunZia\nTransmission System to the Pinal Central substation in Pinal County, Arizona.\n4.\nEligibility.  Long-term firm transmission service over SunZia Transmission’s Regional\nTransmission Facilities placed under the CAISO’s Operational Control is provided by SunZia\nTransmission to Subscriber pursuant to the TSA.  Long-term transmission service over the\nArizona Entitlements is provided by WAPA, TEP and SRP to Subscriber under the Arizona\nTSAs of which operational control is conveyed to SunZia Transmission pursuant to the AZEA.\nThe services to Subscriber over the Regional Transmission Facilities and the Arizona\nEntitlements shall be the “Subscriber Service”.  Transmission capacity reserved for Subscriber\nService shall constitute a Subscriber Encumbrance under the TCA.  Transmission service other\nthan Subscriber Service shall be provided only to Eligible Customers pursuant to the TCA and\nthe CAISO Tariff.\n5.\nNon-Subscriber Usage Rate, Subscriber Cost Recovery and Transmission Rates.\n5.1\nNon-Subscriber Usage Rate.  To the extent that the Regional Transmission Facilities or\nArizona Entitlements are used by a Non-Subscriber to provide transmission service\nunder the CAISO Tariff, the Non-Subscriber shall pay to the CAISO a Non-Subscriber\nUsage Fee ($/MWh) in accordance with Appendix I.\n5.2\nSubscriber Cost Recovery.  The Subscriber has the right to recover lost production tax\ncredits and/or lost investment tax credits as interconnection-related outage costs and\nSunZia Transmission has the right to recover lost transmission revenue as\ninterconnection-related outage costs with respect to the SunZia Transmission System, in\nboth cases, as accepted by the FERC in SunZia Transmission, LLC, Order Accepting\nTariff, Docket No.  ER23-2146-001, 185 FERC ¶ 61,052 PP 25-26 (issued October 20,\n2023).\n5.3\nTransmission Rate Recovery.  SunZia Transmission is entitled to all rights, including\nrate recovery, associated with the SunZia Transmission System.\n5.4\nTransmission Rates for Subscriber Service.  The rates for Subscriber Service are paid\noutside of the CAISO settlement systems.\n6.\nAncillary Services - Applicability and Charges.  If any Ancillary Services are required, SunZia\nTransmission will not provide such services directly to the transmission customer and the\ntransmission customer will be required to meet any such requirement in accordance with the\nCAISO Tariff.\n7.\nBilling and Payment.\n7.1\nThe CAISO, in accordance with the CAISO Tariff, shall pay the Participating TO,\namong other things, all applicable Non-Subscriber Usage Payments, including applicable\nWheeling Revenues in accordance with the CAISO Tariff.\n7.2\nIf, subsequent to the initial build of the SunZia Transmission System, SunZia\nTransmission is ordered by the CAISO to construct, own and operate additional transmission\nfacilities, then the CAISO in accordance with the CAISO Tariff, shall pay SunZia Transmission,\namong other things, all applicable FERC-approved Transmission Revenue Requirement in\nEffective ______________"},{"page":36,"startToken":13084,"endToken":13641,"text":"SUNZIA TRANSMISSION, LLC\nFERC Electric Tariff Volume 2\nFirst Revised Sheet No.  5\nconnection with the expansion of the SunZia Transmission System consistent with Section 24 of\nthe CAISO Tariff.\n8.\nObligation to Interconnect or Construct Transmission Expansions and Facility Upgrades.\nAll requests for interconnection with the SunZia Transmission System should be directed to the\nCAISO with notice of such request provided to SunZia Transmission.  Interconnections under\nthis TO Tariff shall be available to entities eligible to request Interconnection consistent with the\nprovisions of Section 210(a) of the Federal Power Act.  Expansion of and/or interconnection to\nthe SunZia Transmission System presently placed under the CAISO’s Operational Control by\nSunZia Transmission by Generating Units, energy storage co-located with Large Loads and\nCo-located Generating Units with Large Loads shall be governed by the CAISO Tariff.  The\nArizona Transmission Rights placed under the Operational Control of CAISO by SunZia\nTransmission are Arizona Entitlements that require the approval of the owners of those\ntransmission facilities for interconnection and SunZia Transmission does not have the legal\nauthority to compel expansion or interconnection to those facilities.  SunZia Transmission’s\nobligation to expand and/or interconnect the SunZia Transmission System to load and/or to\nfacilities providing wholesale transmission service shall be determined in accordance with all\napplicable FERC and/or Local Regulatory Authority requirements.\n8.1\nParticipating TO Obligation to Interconnect.  This Section 8.1, 9.1, and 10.1, and\ntheir subparts, are provided for consistency with the TO Tariffs of other PTOs and for\npotential future application should SunZia Transmission acquire transmission facilities\nor acquire additional legal authority in its existing facilities that would provide SunZia\nTransmission sufficient legal authority to implement those Sections.  Sections 8.1, 9, and\n10 and their subparts have no current application to the Arizona Entitlements turned over\nto CAISO’s Operational Control by SunZia Transmission, which are covered solely by\nSection 8(exclusive of Section 8.1 and its subparts) as to expansions and\ninterconnections.\n8.1.1\nInterconnection to Transmission System.  Interconnection must be consistent\nwith Good Utility Practice, in conformance with all Applicable Reliability\nCriteria, all applicable statutes, regulations and CAISO reliability criteria for the\nCAISO Controlled Grid.  The Participating TO will not accommodate the\nInterconnection if doing so would impair system reliability or would otherwise\nadversely affect the ability of the Participating TO to honor its Encumbrances\nexisting as of the time a party submits its Interconnection Application.  The\nParticipating TO shall identify any such adverse effect on its Encumbrances in\nthe Interconnection Study.  To the extent the Participating TO determines that\nthe Interconnection will have an adverse effect on Encumbrances, the party\nrequesting Interconnection shall mitigate such adverse effect.\n8.1.2\nCosts Associated with Interconnection.  Each party requesting Interconnection\nshall pay the costs of planning, installing, owning, operating, and maintaining\nany Direct Assignment Facilities and, if applicable, any Reliability Upgrades\nrequired to provide the requested Interconnection, except as provided in\nAppendix DD of the CAISO Tariff, and any interconnection-related outage costs\nas accepted by FERC in Docket No. ER23-2146-001, SunZia Transmission,\nLLC, Order Accepting Tariff, 185 FERC ¶ 61,052 PP 25-26 (Oct.  20, 2023).  In\naddition, such party shall implement all existing operating procedures necessary\nto safely and reliably interconnect such party’s facilities to the facilities of the\nParticipating TO and to ensure the CAISO Controlled Grid’s conformance with\nEffective ______________"},{"page":37,"startToken":13641,"endToken":14148,"text":"SUNZIA TRANSMISSION, LLC\nFERC Electric Tariff Volume 2\nFirst Revised Sheet No.  6\nthe CAISO Grid Planning Criteria, and shall bear all costs of implementing such\noperating procedures.  Any additional costs associated with accommodating the\nInterconnection shall be allocated in accordance with the cost responsibility\nmethodology set forth in the CAISO Tariff for transmission expansions or\nupgrades or, for the expansion and/or interconnection of the SunZia\nTransmission System to provide service to load and/or to facilities providing\nwholesale transmission service, in accordance with all applicable FERC and/or\nLocal Regulatory Authority requirements.\n8.1.3\nInterconnection Agreement.  Pursuant to Section 13 of Appendix DD of the\nCAISO Tariff, the Participating TO will tender to such party an Interconnection\nAgreement.  The Interconnection Agreement will include, without limitation,\ncost responsibilities and payment provisions for any engineering, equipment,\nconstruction, ownership, operation and maintenance costs for any Direct\nAssignment Facilities, any Reliability Upgrades, any Delivery Upgrades, if\napplicable, and for any other mitigation measures consistent with the CAISO\nTariff.  The Interconnection Agreement will set forth a payment schedule that\nenables the Participating TO to recover its costs consistent with the CAISO\nTariff.  If the applicant elects not to execute the Interconnection Agreement and\ndoes not request the Participating TO to file an unexecuted Interconnection\nAgreement, its Completed Interconnection Application shall be deemed\nwithdrawn.  To maintain its queue position, the applicant must timely comply\nwith the interconnection requirements of Appendix DD of the CAISO Tariff and\nSections 8.1 and 10.1 and its subparts of this TO Tariff.\n8.1.4\nDue Diligence to Construct.  The Participating TO shall use due diligence to\nconstruct, within a reasonable time, any Direct Assignment Facilities and any\nNetwork Upgrades that it is obligated to construct pursuant to this TO Tariff and,\nas applicable, Section 24 and Appendix DD of the CAISO Tariff.  The\nParticipating TO’s obligation to build will be subject to: (i) its ability, after\nmaking a good faith effort, to obtain any necessary approvals and property rights\nunder applicable federal, state, and local laws; (ii) the presence of a cost\nrecovery mechanism with cost responsibility assigned in accordance with the\nCAISO Tariff or applicable FERC precedent; and (iii) a signed Interconnection\nAgreement or a signed Engineering and Procurement Agreement or, by mutual\nagreement of the parties, FERC acceptance for filing of an unexecuted\nInterconnection Agreement.\n8.1.5\nEnergization.  The Participating TO shall not be obligated to energize, nor shall\nthe applicant or wholesale load be entitled to have its Interconnection to the\nCAISO Controlled Grid energized, unless and until an Interconnection\nAgreement has been executed, or filed at FERC pursuant to Section 8.1.3, and\nbecomes effective and such applicant or wholesale load has demonstrated to the\nCAISO’s reasonable satisfaction that it has complied with all of the requirements\nof the CAISO Tariff and the requirements of this TO Tariff.\n8.1.6\nCoordination with CAISO on Interconnection Requests.  The Participating\nTO shall coordinate with the CAISO, pursuant to the provisions of the TCA and\nCAISO Tariff.\nEffective ______________"},{"page":38,"startToken":14148,"endToken":14668,"text":"SUNZIA TRANSMISSION, LLC\nFERC Electric Tariff Volume 2\nFirst Revised Sheet No.  7\n8.1.7\nParticipating TO Obligation to Construct Transmission Expansions or\nFacility Upgrades.  The Participating TO shall be obligated to build\ntransmission additions and facility upgrades where the Participating TO is\nobligated to construct or expand facilities in accordance with and subject to the\nlimitations of Section 24 of the CAISO Tariff and this TO Tariff.\n8.1.8\nObligation to Construct.  A Participating TO shall not be obligated to construct\nor expand transmission facilities or system upgrades unless and until the\nconditions stated in Section 9.1.3.1 hereof have been satisfied.\n8.1.9\nRequest for FERC Deference Regarding Need Determination.  It is intended\nthat FERC grant substantial deference to the factual determinations of the\nCAISO (including the CAISO’s ADR Procedures), WECC, or the RTG\ncoordinated planning processes as to the need for or construction of a facility,\nthe need for full cost recovery, and the allocation of costs.\n9.\nExpansion Process for SunZia Transmission System and Arizona Entitlements.  The\nexpansion process related to the SunZia Transmission System where SunZia Transmission is the\nlead Participating TO with respect to a required system expansion is set forth in Section 9.1 of\nthis TO Tariff.  The Expansion process for SunZia Transmission’s Arizona Entitlements to the\nArizona Transmission Rights, which it has turned over to the Operational Control of the CAISO,\nis as stated in Section 8 above.  Section 9 and its subparts shall not currently apply to those\nArizona Entitlements.\n9.1\nExpansion Process.  Unless SunZia Transmission is the lead Participating TO with\nrespect to a required system expansion, the provisions of Section 9.1 of this TO Tariff,\nand its subparts, shall have no application to Regional Transmission Facilities, Local\nTransmission Facilities, or the Arizona Entitlements turned over to the CAISO’s\nOperational Control by SunZia Transmission.  With respect to the expansion of the\ntransmission facilities by one or more of the transmission owners providing the Arizona\nTransmission Rights, the corresponding provisions of the open access transmission tariff\nof such transmission owner shall govern.\n9.1.1\nDetermination of Facilities.  A Participating TO shall perform a study in\naccordance with this Section where (1) the Participating TO is obligated to\nconstruct or expand facilities in accordance with Section 24 and Appendix DD\nof the CAISO Tariff and this TO Tariff; (2) a Market Participant agrees to pay\nthe costs of the study and provides an Interconnection Request consistent with\nthe requirements of Appendix DD of the CAISO Tariff\n9.1.2\nPayment of Study Cost\n9.1.2.1 Interconnection Customer to Pay for Interconnection Study.  Where\nan Interconnection Study and the need for the transmission addition or\nupgrade has not yet been established in accordance with the procedures\nestablished herein and the CAISO Tariff, the Interconnection Customer\nshall pay the cost of the Study consistent with the CAISO Tariff.\n9.1.2.2 Project Sponsor or Project Proponent to Pay for Interconnection\nStudy.  Where the facilities to be added or upgraded have been\ndetermined to be needed in accordance with the procedures established\nEffective ______________"},{"page":39,"startToken":14668,"endToken":15112,"text":"SUNZIA TRANSMISSION, LLC\nFERC Electric Tariff Volume 2\nFirst Revised Sheet No.  8\nherein and the CAISO Tariff, the Project Sponsor, Project Proponent, or\nthe CAISO requesting the study shall pay in advance the reasonable cost\nof the Interconnection Study.\n9.1.2.3 Principal Beneficiaries to Pay for Interconnection Study.  Where the\nfacilities to be added or upgraded have been determined to be needed\nand the principal beneficiaries have been identified by the CAISO or\nthrough the CAISO ADR Procedures in accordance with the CAISO\nTariff, the Project Sponsor and the identified principal beneficiaries\nshall pay the reasonable cost of the Interconnection Study, in such\nproportions as may be agreed, or, failing agreement, as determined in\naccordance with the CAISO ADR Procedures.\n9.1.2.4 Payment Procedure.  Where an Interconnection Study is being\nconducted pursuant to this TO Tariff, the Participating TO shall, within\nthirty days of receipt of all reasonably required information, tender to\nthe Interconnection Customer, Project Sponsor, Project Proponent,\nCAISO, or identified principal beneficiaries, as the case may be, an\nInterconnection Study agreement that defines the scope, content,\nassumptions, and terms of reference for such study, the estimated time\nrequired to complete it, and such other provisions as the parties may\nreasonably require and pursuant to which such Interconnection\nCustomer, Project Sponsor, Project Proponent, the CAISO, or identified\nprincipal beneficiaries agree to reimburse the Participating TO the\nreasonable cost of performing the required Interconnection Study.  If the\nInterconnection Customer, Project Sponsor, Project Proponent, the\nCAISO, or identified principal beneficiaries, as the case may be, agree to\nthe terms of the Interconnection Study agreement, they shall execute the\nInterconnection Study agreement and return it to the Participating TO\nwithin ten Business Days.  Alternatively, if the Interconnection\nCustomer, Project Sponsor, Project Proponent, the CAISO, or identified\nprincipal beneficiaries, as the case may be, request the Participating TO\nto proceed with the Interconnection Study and commit to abide by the\nterms, conditions, and cost assignments ultimately determined under the\nCAISO ADR Procedures, including any determination by FERC or\nappeal of a FERC determination in accordance with that process, the\nParticipating TO shall promptly proceed with the Interconnection Study,\nand the parties shall submit the disputed terms for resolution under the\nCAISO’s ADR Procedures.\n9.1.2.5 Interconnection Study Procedures.  Where an Interconnection Study is\nbeing conducted pursuant to the CAISO Tariff, the terms and conditions\nfor such studies shall be in accordance with the CAISO Tariff, including\nAppendix DD.\n9.1.3\nObligation to Build.\n9.1.3.1 Due Diligence to Construct.  The Participating TO shall use due\ndiligence to construct, within a reasonable time, additions or upgrades to\nEffective ______________"},{"page":40,"startToken":15112,"endToken":15586,"text":"SUNZIA TRANSMISSION, LLC\nFERC Electric Tariff Volume 2\nFirst Revised Sheet No.  9\nits transmission system that it is obligated to construct pursuant to the\nCAISO Tariff and this TO Tariff.\n9.1.3.2 Delay in Construction or Expansion.  If any event occurs that will\nmaterially affect the time for completion of new facilities, or the ability\nto complete them, the Participating TO shall promptly notify the CAISO\nwith regard to facilities determined to be needed.  The Participating TO\nshall also notify the Project Sponsor, Parties to the Generator\nInterconnection Agreement and the CAISO as the case may be.  In such\ncircumstances, the Participating TO shall, within thirty days of notifying\nsuch Project Sponsor, Parties to the Interconnection Agreement, and the\nCAISO of such delays, convene a technical meeting with such Project\nSponsor, Parties to the Generator Interconnection Agreement, and the\nCAISO to discuss the circumstances which have arisen and evaluate any\noptions available.  The Participating TO also shall make available to\nsuch Project Sponsor, Parties to the Interconnection Agreement, and the\nCAISO, as the case may be, studies and work papers related to the cause\nand extent of the delay and the Participating TO’s ability to complete the\nnew facilities, including all information that is in the possession of the\nParticipating TO that is reasonably needed to evaluate the alternatives.\n9.1.3.2.1\nAlternatives to the Original Facility Additions.  If the\nreview process of Section 9.1.3.2 determines that one or more\nalternatives exist to the originally planned construction project,\nthe Participating TO shall present such alternatives for\nconsideration to the Project Sponsor, Parties to the Generator\nInterconnection Agreement, and the CAISO, as the case may be.\nIn the event the Participating TO concludes that no reasonable\nalternative exists to the originally planned addition or upgrade\nand the Project Sponsor or Parties to the Interconnection\nAgreement or the CAISO disagree, the dispute shall be resolved\npursuant to the CAISO ADR Procedures.\n9.1.3.2.2\nRefund Obligation for Unfinished Facility Additions.\nIf the Participating TO and the Project Sponsor, the CAISO, or\nParties to the Generator Interconnection Agreement, as the case\nmay be, mutually agree that no other reasonable alternatives\nexist, the obligation to construct the requested additions or\nupgrades shall terminate and any deposit not yet applied toward\nthe expended project costs shall be returned with interest\npursuant to FERC Section 35.19(a)(2)(iii).  However, the Project\nSponsor and any identified principal beneficiaries, as the case\nmay be, shall be responsible for all costs prudently incurred by\nthe Participating TO through the time the construction was\nsuspended.\n9.1.4\nProvisions Relating To Transmission Construction On the Systems Of\nOther TOs.\n9.1.4.1 Responsibility for Third Party Additions.  A Participating TO shall\nnot be responsible for making arrangements for any engineering,\nEffective ______________"},{"page":41,"startToken":15586,"endToken":16084,"text":"SUNZIA TRANSMISSION, LLC\nFERC Electric Tariff Volume 2\nFirst Revised Sheet No.  10\npermitting, and construction of any necessary transmission or\ndistribution facilities additions on the system(s) of any other entity or for\nobtaining any regulatory approval for such facilities.  The Participating\nTO shall undertake reasonable efforts through the coordinated planning\nprocess to assist in making such arrangements, including, without\nlimitation, providing any information or data required by such other\nelectric system pursuant to Good Utility Practice.\n9.1.4.2 Coordination of Third-Party System Additions.  Where transmission\nadditions or upgrades being built pursuant to the CAISO Tariff require\nadditions or upgrades on other systems, the Participating TO shall\ncoordinate construction on its own system with the construction required\nby others.  The Participating TO, after consultation with the CAISO, and\nthe Project Sponsor, as the case may be, may defer construction if the\nnew transmission facilities on another system cannot be completed in a\ntimely manner.  The Participating TO shall notify such Project Sponsor,\nParties to the Generator Interconnection Agreement, and the CAISO, in\nwriting of the basis for any decision to defer construction and the\nspecific problems which must be resolved before it will initiate or\nresume construction of the new facilities.  Such Project Sponsor, Parties\nto the Participation Agreement, or the CAISO may challenge the\ndecision in accordance with the CAISO ADR Procedures.\n10.\nInterconnection Process for SunZia Transmission’s Arizona Entitlements.\n The\ninterconnection process for SunZia Transmission’s Arizona Entitlements in the Arizona\nTransmission Rights, which it has turned over to CAISO Operational Control, is as stated in\nSection 8 above.  Section 10, and its subparts, do not currently apply to those Arizona\nEntitlements.\n10.1\nInterconnection Process.  Unless SunZia Transmission is the lead Participating TO with\nrespect to a requested interconnection, the provisions of Section 10 of this TO Tariff, and\nits subparts, shall have no application to the Regional Transmission Facilities, Local\nTransmission Facilities, or Arizona Entitlements turned over to the CAISO’s Operational\nControl by SunZia Transmission and the corresponding provisions of the lead\nParticipating TO’s TO Tariff shall govern.  All requests for interconnection with the\nRegional Transmission Facilities, Local Transmission Facilities, or Arizona Entitlements\nturned over to the CAISO’s Operational Control by SunZia Transmission shall be\ndirected to the lead Participating TO, with notice of the request provided to SunZia\nTransmission.\n10.2\nApplicability.  All requests for Interconnection directly to the CAISO Controlled Grid\nfrom parties eligible to request such Interconnection consistent with Section 210(a) of\nthe FPA shall be processed pursuant to the CAISO Tariff.\n11.\nUncontrollable Forces and Indemnification.\n11.1\nProcedures to Follow if Uncontrollable Force Occurs.  In the event of the occurrence\nof an Uncontrollable Force which prevents a Party from performing any of its obligations\nunder this TO Tariff, such Party shall (i) immediately notify the other Parties in writing\nof the occurrence of such Uncontrollable Force, (ii) not be entitled to suspend\nperformance in any greater scope or longer duration than is required by the\nEffective ______________"},{"page":42,"startToken":16084,"endToken":16702,"text":"SUNZIA TRANSMISSION, LLC\nFERC Electric Tariff Volume 2\nFirst Revised Sheet No.  11\nUncontrollable Force, (iii) use its best efforts to mitigate the effects of such\nUncontrollable Force, remedy its inability to perform, and resume full performance\nhereunder, (iv) keep the other Parties apprised of such efforts on a continual basis and\n(v) provide written notice of the resumption of performance hereunder.  Notwithstanding\nany of the foregoing, the settlement of any strike, lockout, or labor dispute constituting\nan Uncontrollable Force shall be within the sole discretion of the Party to this TO Tariff\ninvolved in such strike, lockout, or labor dispute and the requirement that a Party must\nuse its best efforts to remedy the cause of the Uncontrollable Force and mitigate its\neffects and resume full performance hereunder shall not apply to strikes, lockouts, or\nlabor disputes.  No Party will be considered in default as to any obligation under this TO\nTariff if prevented from fulfilling the obligation due to the occurrence of an\nUncontrollable Force.\n11.2\nIndemnification.  A Market Participant shall at all times indemnify, defend, and save\nthe Participating TO harmless from any and all damages, losses, claims, (including\nclaims and actions relating to injury or to death of any person or damage to property),\ndemands, suits, recoveries, costs and expenses, court costs, attorney fees, and all other\nobligations by or to third parties, arising out of or resulting from the Participating TO’s\nperformance of its obligations under this TO Tariff on behalf of a Market Participant,\nexcept in cases of negligence or intentional wrongdoing by the Participating TO.\n11.3\nOpen Access. For purposes of the Stranded Cost Recovery available under Order Nos.\n888 and 888-A, this Tariff, combined with the CAISO Tariff and wholesale distribution\naccess tariff, if any, shall be considered an open access tariff under FERC Order Nos.\n888 and 888-A.\n12.\nRegulatory Filings.  Nothing contained herein shall be construed as affecting, in any way, the\nright of SunZia Transmission to unilaterally make application to FERC as it deems necessary and\nappropriate to revise its Non-Subscriber Usage Rate, or for a change in its terms and conditions,\nincluding changes in rate methodology, or for a change in designation of the Arizona\nEntitlements to be placed under the CAISO’s Operational Control, pursuant to the applicable\nFERC rules, regulations, policies, and governing statutes.\n13.\nMiscellaneous.\n13.1\nNotices.  Any notices, demand, or request in accordance with this TO Tariff, unless\notherwise provided in this TO Tariff, shall be in writing and shall be deemed properly\nserved, given, or made: (i) upon delivery if delivered in person, (ii) five days after\ndeposit in the mail if sent by first class United States mail, postage prepaid, (iii) upon\nreceipt of confirmation by return email, or (iv) upon delivery if delivered by prepaid\ncommercial courier service, in each case addressed to a Party at the address set forth in\nAppendix III.  Any Party may at any time, by notice to the other Parties, change the\ndesignation or address of the person specified in Appendix II to receive notice on its\nbehalf.  Any notice of a routine character in connection with service under this TO Tariff\nshall be given in such a manner as the Parties may determine from time to time, unless\notherwise provided in this TO Tariff.\n13.2\nWaiver.  Any waiver at any time by any Party of its rights with respect to any default\nunder this TO Tariff, or with respect to any other matter arising in connection with this\nTO Tariff, shall not constitute or be deemed a waiver with respect to any subsequent\ndefault or other matter arising in connection with this TO Tariff.  Any delay short of the\nEffective ______________"},{"page":43,"startToken":16702,"endToken":17265,"text":"SUNZIA TRANSMISSION, LLC\nFERC Electric Tariff Volume 2\nFirst Revised Sheet No.  12\nstatutory period of limitations in asserting or enforcing any right shall not constitute or\nbe deemed a waiver.\n13.3\nConfidentiality.\n13.3.1 Maintaining Confidentiality if Not for Public Disclosure.  The Participating\nTO shall maintain the confidentiality of all of the documents, data, and\ninformation provided to it by any other Party that such Party may designate as\nconfidential, provided, however, that the information will not be held\nconfidential by the receiving Party if (1) the designating Party is required to\nprovide such information for public disclosure pursuant to this TO Tariff or\napplicable regulatory requirements, or (2) the information becomes available to\nthe public on a non-confidential basis (other than from the receiving Party).\n13.3.2 Disclosure of Confidential Information.  Notwithstanding anything in this\nSection 13.3.2 to the contrary, if any Party is required by applicable laws or\nregulations, or in the course of administrative or judicial proceedings, to disclose\ninformation that is otherwise required to be maintained in confidence pursuant to\nthis Section 13.3.2, the Party may disclose such information; provided, however,\nthat as soon as such Party learns of the disclosure requirement and prior to\nmaking such disclosure, such Party shall notify the affected Party or Parties of\nthe requirement and the terms thereof The affected Party or Parties may, at their\nsole discretion and own costs, direct any challenge to or defense against the\ndisclosure requirement and the disclosing Party shall cooperate with such\naffected Party or Parties to the maximum extent practicable to minimize the\ndisclosure of the information consistent with applicable law.  The disclosing\nParty shall cooperate with the affected Parties to obtain proprietary or\nconfidential treatment of confidential information by the person to whom such\ninformation is disclosed prior to any such disclosure.\n13.4\nTO Tariff Supersedes Existing Tariffs.  Upon the filing of this TO Tariff at FERC and\nFERC’s acceptance of such TO Tariff for filing and FERC’s acceptance of the\nwithdrawal of SunZia Transmission’s open access transmission tariff as accepted by\nFERC in Docket No. ER23-2146-001, SunZia Transmission, LLC, Order Accepting\nTariff, 185 FERC ¶ 61,052 (Oct. 20, 2023), this TO Tariff, together with the CAISO\nTariff and wholesale distribution access tariff if any, supersedes any pre-existing open\naccess transmission tariff of the Participating TO.\n13.5\nTitles.  The captions and headings in this TO Tariff are inserted solely to facilitate\nreference and shall have no bearing upon the interpretation of any of the rates, terms, and\nconditions of this TO Tariff.\n13.6\nSeverability.  If any term, covenant, or condition of this TO Tariff or the application or\neffect of any such term, covenant, or condition is held invalid as to any person, entity, or\ncircumstance, or is determined to be unjust, unreasonable, unlawful, imprudent, or\notherwise not in the public interest, by any court or government agency of competent\njurisdiction, then such term, covenant, or condition shall remain in force and effect to the\nmaximum extent permitted by law, and all other terms, covenants, and conditions of this\nTO Tariff and their application shall not be affected thereby but shall remain in force and\neffect.  The Parties shall be relieved of their obligations only to the extent necessary to\neliminate such regulatory or other determination, unless a court or governmental agency\nEffective ______________"},{"page":44,"startToken":17265,"endToken":17706,"text":"SUNZIA TRANSMISSION, LLC\nFERC Electric Tariff Volume 2\nFirst Revised Sheet No.  13\nof competent jurisdiction holds that such provisions are not severable from all other\nprovisions of this TO Tariff.\n13.7\nPreservation of Obligations.  Upon termination of this TO Tariff, all unsatisfied\nobligations of each Party shall be preserved until satisfied.\n13.8\nGoverning Law.  This TO Tariff shall be interpreted, governed by, and construed under\nthe laws of the State of California, without regard to the principles of conflict of laws\nthereof, or the laws of the United States, as applicable, as if executed and to be\nperformed wholly within the State of California.\n13.9\nAppendices Incorporated.  The appendices to this TO Tariff are attached to this TO\nTariff and are incorporated by reference as if fully set forth herein.\n13.10\nConsistency with CAISO Tariff.  This TO Tariff, with the exception of Section 5.2, is\nintended to be consistent with the CAISO Tariff, and, if necessary, shall be amended to\nconform with any changes authorized or required in any final order in a FERC\nproceeding mandating such changes in the CAISO Tariff.  If a Market Participant\nidentifies a conflict between the TO Tariff and the CAISO Tariff other than Section 5.2\nof this TO Tariff, the Participating TO and the Market Participant shall make good-faith\nefforts to resolve the conflict.  If the Parties are unable to informally resolve that conflict,\nthe Parties may use the CAISO ADR Procedures to resolve it as set forth in Section\n13.11 of this Tariff.\n13.11\nDisputes.  Except as limited by law, the CAISO ADR Procedures shall apply to all\ndisputes between parties which arise under this TO Tariff.  The CAISO ADR Procedures\nset forth in Section 13 of the CAISO Tariff shall not apply to disputes as to whether rates\nand charges set forth in this TO Tariff (other than charges for studies) are just and\nreasonable under the FPA.\n13.12\nConflicting Dispatch and Operating Instructions.  In the event a Market Participant\nreceives conflicting dispatch or operating instructions from the CAISO and one or more\nParticipating TO(s), if human safety would not knowingly be neither jeopardized nor\nelectric facilities subject to damage while the Market Participant seeks to reconcile the\nconflict with the appropriate CAISO and Participating TO employees before acting, the\nMarket Participant should attempt a reconciliation.  Otherwise, the Market Participant\nshall adhere to the CAISO Tariff Section 4.2 and follow the CAISO’s instructions.  In no\nevent shall a Market Participant be required to follow dispatch or operating instructions\nfrom the CAISO if following those instructions would knowingly jeopardize human\nsafety.\nEffective ______________"},{"page":45,"startToken":17706,"endToken":18300,"text":"SUNZIA TRANSMISSION, LLC\nFERC Electric Tariff Volume 2\nFirst Revised Sheet No.  1\nAPPENDIX I\nNon-Subscriber Usage Rates\nThe Generation COD Date shall occur on the commercial operation date of the last generating\nunit of the SunZia Transmission Subscriber that is interconnected to the SunZia Transmission\nSystem which generating unit is entitled to schedule energy delivery over the SunZia\nTransmission System using Subscriber Rights.\nNon-Subscriber Usage Rate for the SunZia Transmission System Only (Pete Heinrich to\nPinal Central) – As of the Grant of Operational Control to CAISO:\nFor the period commencing on the grant of operational control of the SunZia Transmission\nSystem to CAISO and the subsequent two-year period following the Generation COD Date and\nin accordance with the CAISO Tariff, the Non-Subscriber Usage Rate for both import and export\ntransactions over the SunZia Transmission System shall be set at $0.00 per MWh.  For the\none-year period beginning on the second anniversary of the Generation COD Date and in\naccordance with the CAISO Tariff, the Non-Subscriber Usage Rate for both import and export\ntransactions over the SunZia Transmission System shall be set at $2.0775 per kW/month (which\nincreases annually by one-half of one percent (0.5%) commencing on the date on which\noperational control of the SunZia Transmission System is granted to CAISO) converted to an\nannual rate (i.e., multiplying by twelve) and then divided by 8,760 hours to derive an hourly\noff-peak rate for use of the SunZia Transmission System by Non-Subscribers.  Commencing on\nthe third anniversary of the Generation COD Date and in accordance with the CAISO Tariff, the\nNon-Subscriber Usage Rate for both import and export transactions over the SunZia\nTransmission System shall be the current monthly point-to-point transmission rate charged by\nSunZia Transmission for use of the SunZia Transmission System by Subscribers in the TSA, as\namended, supplemented, or restated from time to time and as accepted by the Commission\n(which increases annually by one-half of one percent (0.5%) commencing on the date on which\noperational control of the SunZia Transmission System is granted to CAISO), converted to an\nannual rate (i.e., multiplying by twelve) and then divided by 8,760 hours to derive an hourly\noff-peak rate for use of the SunZia Transmission System by Non-Subscribers.  In no event shall\nthe Non-Subscriber Usage Rate for the use of the SunZia Transmission System exceed the\napplicable CAISO Regional Access Charge in effect at the time service is provided to the\nNon-Subscriber.\nNon-Subscriber Usage Rate for the Arizona Transmission Rights Only (Pinal Central to\nPalo Verde) – As of the Grant of Operational Control to CAISO:\nFor the period commencing on the grant of operational control of the Arizona Entitlements to\nCAISO and in accordance with the CAISO Tariff, the Non-Subscriber Usage Rate for the\nArizona Transmission Rights shall be the weighted average (weighted by the amount of firm\npoint-to-point transmission service held as an Arizona Entitlement by SunZia Transmission) of\nthe current firm, monthly point-to-point transmission rates of WAPA, SRP and TEP, as shown on\nthe Open Access Same-Time Information System (“OASIS”) of each transmission provider,\nconverted to an annual rate (i.e., multiplying by twelve) and then divided by 8,760 hours to\nderive an hourly off-peak rate for use of the Arizona Transmission Rights by Non-Subscribers\nplus the actual Schedule 1 and 2 charges imposed by WAPA, SRP and TEP.  In no event shall\nthe Non-Subscriber Usage Rate for the Arizona Transmission Rights exceed the applicable\nCAISO Regional Access Charge in effect at the time service is provided to the Non-Subscriber.\nEffective ______________"},{"page":46,"startToken":18300,"endToken":18428,"text":"SUNZIA TRANSMISSION, LLC\nFERC Electric Tariff Volume 2\nFirst Revised Sheet No.  2\nNon-Subscriber Usage Rate for Combined Segments of SunZia Transmission System and\nArizona Transmission Rights (Pete Heinrich to Palo Verde) – As of the Grant of\nOperational Control to CAISO:\nThe Non-Subscriber Usage Rate for the combined segments of the SunZia Transmission System\nand the Arizona Transmission Rights shall be the sum of the Non-Subscriber Usage Rates for\neach respective segment, as defined above, but such Non-Subscriber Usage Rate shall not exceed\nthe applicable CAISO Regional Access Charge in effect at the time service is provided to the\nNon-Subscriber.\nThe currently-effective components used in the calculation of the Non-Subscriber Usage Rates as\nsuch components change from time to time will be publicly posted on CAISO’s website.\nEffective ______________"},{"page":47,"startToken":18428,"endToken":18504,"text":"SUNZIA TRANSMISSION, LLC\nFERC Electric Tariff Volume 1\nFirst Revised Sheet No.  1\nAPPENDIX II\nNOTICES\nDesignated Representative:\nDeral Danis\nAssistant Vice President, Transmission\n1088 Sansome Street\n200 South Wacker, Suite 1650\nSan Francisco, CA 94111Chicago, IL 60606\nTel.  No.  (312) 259-9989\nEmail Address: deral.danis@patternenergy.com\nAlternate Representative:\nMeghan Gruebner\nSeniorGeneral Counsel\nPattern Energy Group LP\n1088 Sansome Street\nSan Francisco, CA 94111\nTel.  No.  (415) 412-4917\nEmail Address: meghan.gruebnergeneralcounsel@patternenergy.com\nEffective ______________"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":86,"startToken":0,"endToken":319},{"p":2,"at":86,"title":"I. BACKGROUND","method":"printed heading","endPage":5,"endAt":2056,"startToken":319,"endToken":2399},{"p":5,"at":2056,"title":"II. DESCRIPTION OF FILING","method":"printed heading","endPage":6,"endAt":86,"startToken":2399,"endToken":2640},{"p":6,"at":86,"title":"III. ATTACHMENTS TO FILING","method":"printed heading","endPage":6,"endAt":415,"startToken":2640,"endToken":2687},{"p":6,"at":415,"title":"IV. PROPOSED EFFECTIVE DATE","method":"printed heading","endPage":6,"endAt":1031,"startToken":2687,"endToken":2786},{"p":6,"at":1031,"title":"V. COMMUNICATIONS","method":"printed heading","endPage":6,"endAt":1466,"startToken":2786,"endToken":2842},{"p":6,"at":1466,"title":"VI. CONCLUSION","method":"printed heading","endPage":10,"endAt":0,"startToken":2842,"endToken":3047},{"p":10,"at":0,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":30,"endAt":0,"startToken":3047,"endToken":10796},{"p":30,"at":0,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":47,"endAt":586,"startToken":10796,"endToken":18504}]}