{"document":{"slug":"rec-20261116-5274","title":"SunZia Transmission - Trans. Owner Tariff Response to Show Cause Order EL26-71-","issued":"2026-11-16","accession":"20261116-5274","docket":"ER27-515-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"SunZia Transmission, LLC","kind":"tariff filing","file":"sources/filings/text/20261116-5274_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5274","tier":"record","sha256":"96ae06c3d15bacf7f3c0439774e651e070a8c7b4caf7c6c30909e7af896a28fa","pages":7,"tokens":2976,"emptyPages":[],"textThemes":["colo"]},"pages":[{"page":1,"startToken":0,"endToken":271,"text":"4923-9080-5463.1 \nNovember 16, 2026 \nE-TARIFF FILING \n \nThe Honorable Debbie-Anne A. Reese \nSecretary \nFederal Energy Regulatory Commission \n888 First Street, NE \nWashington, DC 20426 \n \nRE: \nSunZia Transmission, LLC  \nDocket No. ER27-___-000 \nAmendments to Transmission Owner Tariff in Compliance with the Docket \nNo. EL26-71-000 Order to Show Cause \n \nDear Secretary Reese: \n \nPursuant to Section 205 of the Federal Power Act1 and Part 35 of the rules and \nregulations2 of the Federal Energy Regulatory Commission (“Commission”), the Commission’s \nOrder Granting Rescission and Abeyance Requests3 and the Commission’s Order Instituting \nProceeding Under Section 206 of the Federal Power Act,4 SunZia Transmission, LLC (“SunZia \nTransmission”) hereby tenders for filing amendments to its Transmission Owner Transmission \nTariff (“TO Tariff”)5 to incorporate changes to those provisions of the TO Tariff necessary to \ntrack changes being made simultaneously by the California Independent System Operator \nCorporation (“CAISO”) to its Open Access Transmission Tariff (the “CAISO Tariff”) to \nfacilitate the fast and reliable interconnection of new large loads and co-located loads to the \nCAISO-managed transmission system.  The revisions to the SunZia Transmission TO Tariff are \nsubmitted and designated in accordance with Order No. 7146 and the Commission’s e-Tariff \nfiling requirements. \n \n1  \n16 U.S.C. § 824d (2021). \n2  \n18 C.F.R. Part 35 (2026). \n3  \nCalifornia Independent System Operator Corporation, et al., 196 FERC ¶ 61,131 (issued August 14, 2026). \n4  \nCalifornia Independent System Operator Corporation, et al., 195 FERC ¶ 61,214 (issued June 18, 2026) (the \n“Order to Show Cause”). \n5  \nSunZia Transmission, LLC, FERC Electric Tariff Volume 2. \n6  \nElectronic Tariff Filings, Order No. 714, III FERC Stats. & Regs., Regs. Preambles ¶ 31,276 (2008)."},{"page":2,"startToken":271,"endToken":840,"text":"The Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 2 of 7 \n \n4923-9080-5463.1 \n \nI. \nBACKGROUND \nSunZia Transmission is an indirect, wholly-owned subsidiary of Pattern Energy Group \nLP and has developed, constructed and recently placed into commercial operation, an \napproximately 552-mile, bi-pole, high voltage, direct current (“HVDC”) 500 kV transmission \nline (the “Transmission System”) with a transmission capacity of 3,021 MW in New Mexico and \nArizona that connects generation resources in the Southwest with markets and customers in \nCalifornia and Arizona.7  SunZia Transmission commenced construction of the Transmission \nSystem in 2023 and placed the Transmission System into commercial operations in April, 2026.  \nThe Transmission System has been developed as a merchant transmission project with negotiated \nrate authority contingent on the allocation of its transmission capacity pursuant to an open \nsolicitation process reviewed and approved by the Commission.8 \n \nAs a result, the entire capacity of the Transmission System is committed to two \nSubscribers, SunZia Wind South LLC and SunZia Wind North LLC (collectively, the “SunZia \nWind Companies”), both of which own and operate wind-powered electric generating facilities \nlocated in Lincoln, Torrance, and San Miguel Counties, New Mexico (the “SunZia Wind \nProjects”).  SunZia Transmission will provide to the SunZia Wind Companies firm point-to-\npoint transmission service for the entire rated capacity of the Transmission System over a thirty-\nyear term9 from the Point of Receipt at the Pete Heinrich 345 kV AC Switchyard to the Point of \nDelivery at the Salt River Project Agricultural Improvement and Power District’s (“SRP”) Pinal \nCentral 500 kV Substation pursuant to Amended and Restated Transmission Service Agreements \n \n7 \nSunZia Transmission and the New Mexico Renewable Energy Transmission Authority (“RETA”) have entered \ninto a lease arrangement pursuant to which RETA owns the physical assets of the Transmission System.  \nSunZia Transmission and RETA are both responsible for the co-development of the Transmission System, \nwhile SunZia Transmission is responsible for the construction and financing of the Transmission System and is \nthe owner of the capacity rights created by the Transmission System.  RETA is a state authority established by \nthe New Mexico legislature in 2007 and charged with implementing the New Mexico Renewable Energy \nAuthority Transmission Act, NMSA 1978 § 62-16A-1, et seq. (the “Act”).  As an authority or instrumentality \nof the State of New Mexico, RETA is not a “public utility” within the meaning of Section 201 of the FPA.  See \n16 U.S.C. § 824(f) (2019).  Under the Act, RETA is authorized to plan, finance, develop and acquire \ntransmission and storage projects (transmitting or storing at least 30% renewable energy) in order to promote \nthe development of renewable energy in New Mexico.  For purposes of this filing, SunZia Transmission is \nconsidered the Transmission Owner in interest of the Transmission System pursuant to the lease arrangement \ndescribed above. \n8  \nAllocation of Capacity on New Merchant Transmission Projects and New Cost-Based, Participant-Funded \nTransmission Projects; Priority Rights to New Participant-Funded Transmission, 142 FERC ¶ 61,038, P 16 \n(2013), recon. den’d, 142 FERC ¶ 61,213 (2013).  Capacity on the SunZia Transmission System has been \nallocated pursuant to two open solicitation processes both of which were filed with, reviewed and accepted by \nthe Commission.  See SunZia Transmission, LLC, 160 FERC ¶ 61,074 (2017); SunZia Transmission, LLC, 179 \nFERC ¶ 61,135 (2022). \n9  \nThe initial thirty-year term commenced on July 30, 2026.  Each of the SunZia Wind Companies has roll-over \nrights to continue service at the end of the initial term."},{"page":3,"startToken":840,"endToken":1402,"text":"The Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 3 of 7 \n \n4923-9080-5463.1 \ndated March 6, 2026 (the “TSAs”), both of which have been filed with and accepted for filing by \nthe Commission.10  \n \nIn addition, the SunZia Wind Companies have acquired 2,131 MW of long-term, firm \npoint-to-point transmission service from the Pinal Central 500 kV Substation to the Palo Verde \n500 kV Hub (which interconnects to the CAISO-controlled transmission system) through a \nnumber of transmission service agreements with SRP (1,500 MW), the Desert Southwest Region \nof the Western Area Power Administration (“WAPA”) (300 MW), and Tucson Electric Power \nCompany (“TEP”) (331 MW) with initial terms ranging from five years to twenty years and, in \neach case with the SunZia Wind Companies having roll-over rights thereafter (collectively, the \n“Arizona Entitlements”).11  SunZia Transmission has obtained authorization from the SunZia \nWind Companies to administer the Arizona Entitlements (subject at all times to each SunZia \nWind Company’s right to use the Arizona Entitlements for the transmission of electricity to the \nPalo Verde Hub for the benefit of the SunZia Wind Projects) and to grant CAISO operational \ncontrol of the Arizona Entitlements consistent with the Transmission Rights and Curtailment \nInstructions that will be provided by SunZia Transmission consistent with applicable terms and \nconditions of the WAPA, SRP and TEP tariffs and business practices.  \n \nOn September 22, 2023, in Docket No. ER23-2917-000, the CAISO filed proposed \nrevisions to the CAISO Open Access Transmission Tariff (the “CAISO Tariff”) to implement a \nSubscriber Participating Transmission Owner  (“SPTO”)  model to facilitate access by merchant \nand participant-funded projects located outside of California to the CAISO transmission system, \nfurthering State and Federal goals of increasing access to out-of-state carbon-free generating \nresources.  The Commission accepted the CAISO’s proposed tariff changes by order issued \nMarch 12, 2024.12  On January 14, 2024, SunZia Transmission applied to become an SPTO and, \non May 23, 2024, the CAISO Board of Governors approved the SunZia Transmission \napplication.  As a result, when the Transmission System entered commercial operation in April \n9, 2026, operational control of the Transmission System and the Arizona Entitlements was \ngranted by SunZia Transmission to CAISO pursuant to the CAISO’s Transmission Control \nAgreement at which time the SunZia Transmission Open Access Transmission Tariff (“OATT”) \nwas withdrawn.13  As a result, the CAISO Tariff now governs future transmission and \ninterconnection service over the Transmission System (subject to the rights and obligations of \n \n10  \nSunZia Transmission, LLC, Docket Nos. ER25-1636-000 and ER25-1637-000 (April 28, 2026) (unpublished \nletter order). \n11  \nThe SunZia Wind Companies have the right under the transmission tariffs of WAPA, SRP and TEP to request \na change in the Point of Delivery and/or Point of Receipt on either a firm or non-firm basis so that the \ntransmission service is redirectable consistent with the terms of the tariffs and business practices of the three \nArizona transmission providers. \n12  \nCalifornia Independent System Operator Corporation, 186 FERC ¶ 61,177 (2024). \n13  \nSunZia Transmission, LLC, Docket No. ER26-2115-000 (June 4, 2026) (unpublished letter order).  The SunZia \nTransmission OATT was filed on June 15, 2023 in Docket No. ER23-2146-000 and accepted for filing by the \nCommission by order issued October 20, 2023.  SunZia Transmission, LLC, 185 FERC ¶ 61,052 (2023).  As \ndiscussed in note 14 infra, the SunZia Transmission OATT was subsequently modified to address SunZia \nTransmission’s transition to SPTO status under the CAISO Tariff."},{"page":4,"startToken":1402,"endToken":2048,"text":"The Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 4 of 7 \n \n4923-9080-5463.1 \nSunZia Transmission to the SunZia Wind Companies, the customers that are funding the \nconstruction of the Transmission System through their obligation to make transmission capacity \npayments under the TSAs).14  \n \nOn October 21, 2024, SunZia Transmission filed with the Commission its proposed TO \nTariff pursuant to which its transmission facilities and contractual entitlements would be placed \nunder the operational control of CAISO and made available to provide transmission and \ninterconnection service under the CAISO Tariff.  By order issued April 17, 2025, the \nCommission accepted SunZia Transmission’s TO Tariff for filing, to become effective on the \ndate on which operational control of the transmission facilities and contractual entitlements of \nSunZia Transmission is granted to CAISO.15  The Commission found that the rates, terms and \nconditions of the proposed TO Tariff had been shown to be just and reasonable with one \nexception – the rate design used to calculate the Non-Subscriber Usage Rates set forth in the TO \nTariff.  On that issue, the Commission found that the filing raised issues of material fact that \ncannot be resolved based on the record before the Commission.16   \n \n \n14  During SunZia Transmission’s transition to SPTO status, SunZia Transmission and CAISO entered into an \nApplicant Participating Transmission Owner Agreement (the “APTOA”) pursuant to which the parties agreed \nthat the CAISO Tariff govern requests for interconnection with and transmission service over the Transmission \nSystem. The APTOA was filed by CAISO with the Commission on July 5, 2024 in Docket No. ER24-2471-\n000 and was accepted for filing by the Commission on September 3, 2024, and made effective on September 4, \n2024.  California Independent System Operator Corporation, 188 FERC ¶ 61,151 (2024).  On July 8, 2024, in \nDocket No. ER24-2473-000, SunZia Transmission filed revisions to its OATT to amend Sections 17 and 18 to \nnotify current and prospective customers that, upon the effective date of the APTOA, all requests for \ntransmission or interconnection service on the Transmission System will be processed by CAISO in \naccordance with the CAISO Tariff.  The SunZia Transmission OATT revisions were accepted for filing by the \nCommission on September 4, 2024, and to align with the APTOA, was made effective as of September 4, \n2024.  SunZia Transmission, LLC, Docket No. ER24-2473-000 (Sept. 4, 2024) (unpublished letter order). \n \n15  \nSunZia Transmission, LLC, Order Accepting and Suspending Proposed Tariff Revisions, Subject to Refund \nand Establishing Hearing and Settlement Judge Procedures,191 FERC ¶ 61,053 (2025) (the “April 17 Order”).   \n16  \nApril 17 Order at PP 54-55.  SunZia Transmission and the active participants in the proceeding thereafter \nreached an uncontested settlement on the NSUR rate design issue as well as additional NSUR issues that \nresulted in the filing on August 18, 2025 of an Offer of Settlement and Settlement Agreement with the \nCommission that was supported by the Trial Staff (see Docket No. ER25-170-000, Initial Comments by Trial \nStaff Supporting Offer of Settlement and Settlement Agreement (Sept. 8, 2025)) and certified by the Settlement \nJudge (see SunZia Transmission, LLC, 193 FERC ¶ 61,003, Certification of Uncontested Offer of Settlement \n(Oct. 3, 2025)).  The Commission approved the Offer of Settlement and Settlement Agreement by order issued \nJanuary 26, 2026.  SunZia Transmission, LLC, 194 FERC ¶ 61,069 (2026).  Following the filing of the Offer of \nSettlement and Settlement Agreement and prior to Commission approval, the Commission granted the request \nfor rehearing filed by three of the active participants and reversed its prior finding in the April 17 Order that \nthe structuring of the NSUR based on the Commission-accepted Subscriber transmission rates is just and \nreasonable.  SunZia Transmission, LLC, 193 FERC ¶ 61,176 (2025), reh’g req. dism’d, 194 FERC ¶ 61,140 \n(2026), appeal pending, SunZia Transmission, LLC v. Federal Energy Regulatory Commission, Case No. 26-\n1067 (D.C. Cir.).  Settlement negotiations on that issue among the active participants in the proceeding remain \non-going."},{"page":5,"startToken":2048,"endToken":2592,"text":"The Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 5 of 7 \n \n4923-9080-5463.1 \nSunZia Transmission is in a unique position with respect to its compliance with the \nCommission’s directives in the Order to Show Cause for several reasons.  First, SunZia \nTransmission does not directly serve load and, accordingly, there are no provisions in its TO \nTariff that address the interconnection of the load to the SunZia Transmission System.  As a \nresult, the SunZia Transmission TO Tariff is silent with respect to load interconnections and \nthere is no need to modify the Tariff to address the interconnection of large or co-located loads. \nSecond, the SunZia Transmission System is not located within the service territory of a load \nserving participating transmission owner within the CAISO market that is subject to the Order to \nShow Cause and that will be submitting tariff changes in response to the Order to Show Cause.  \nThe SunZia Transmission System is embedded within the service territories of Arizona and New \nMexico load-serving entities that are not subject to the Order to Show Cause or any of the other \nOrders to Show Cause issued to regional transmission operators or independent system operators \nthroughout the country.  Finally, Section 8 of the SunZia Transmission TO Tariff states that all \nrequests for interconnection to the SunZia Transmission System must be directed in the first \ninstance to CAISO with notice of such request being provided to SunZia Transmission.  Thus, \nCAISO is responsible for managing the generator interconnection process for the SunZia \nTransmission System with SunZia Transmission supporting that process through the undertaking \nof studies on the impact of the interconnection on the System. Any changes to the generation \ninterconnection process to facilitate the interconnection of co-located load to the transmission \nsystem must be set forth in the CAISO Tariff, in which case SunZia Transmission will propose \nconforming changes to its TO Tariff to remain consistent with the CAISO’s changes. \n \nII. \nDESCRIPTION OF FILING \nConsistent with the description above as to SunZia Transmission’s unique and limited \nrole in the interconnection process overall, Section 8 of the TO Tariff has been amended to \nclarify that the CAISO Tariff will continue to control with respect to the interconnection of \nGenerating Units, energy storage co-located with Large Load and Co-located Generating Units \nwith Large Loads.  In proposing these limited changes to its TO Tariff, SunZia Transmission \nreserves the right, following review of the proposed tariff changes filed by the other Participating \nTransmission Owners (“PTOs”) that are subject to the Commission’s Order to Show Cause, to \namend this filing to propose additional changes to ensure consistency among all similarly-\nsituated PTOs.   \nFinally, consistent with its comments made during the stakeholder process, SunZia \nTransmission continues to support the need to apply these enhanced Large Load interconnection \nprocedures to Electrically Proximate Loads.  CAISO has explained that the need for such \nchanges within the CAISO footprint in California will be addressed following the submission of \nthe Large Load compliance filing.  SunZia Transmission supports the commencement of that \neffort as soon as possible because the value proposition and the question surrounding how to \nstudy the interconnection of electrically proximate large load and generation in tandem (similar \nto co-located load and generation) are unique when applied to the SunZia Transmission System \nin New Mexico and Arizona."},{"page":6,"startToken":2592,"endToken":2936,"text":"The Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 6 of 7 \n \n4923-9080-5463.1 \nIII. \nATTACHMENTS TO FILING \nIncluded in this filing are the following documents: \n \n1. \nThis Transmittal Letter; \n \n2. \nClean version of the revised SunZia Transmission TO Tariff; and  \n \n3. \nMarked version of the revised SunZia Transmission TO Tariff, showing \nchanges against the currently-effective SunZia Transmission TO Tariff.17 \n  \n \nIV. \nPROPOSED EFFECTIVE DATE \nSunZia Transmission proposes an effective date of sixty days after the Commission \nissues an order on this compliance filing for the changes to its TO Tariff.  A period of sixty days \nafter the Commission approves this filing will allow enough time for SunZia Transmission to \nseamlessly transition to the new processes.  Because a precise effective date is not known at this \ntime, SunZia Transmission is submitting this filing with a 12/31/9998 effective date for the tariff \nrecords, and, if necessary, will make a compliance filing to apply the actual effective date once \nknown.   \nV. \nCOMMUNICATIONS \nCorrespondence and service regarding this filing should be sent to the following \nindividual: \nRobert L. Daileader \nNixon Peabody LLP \n799 Ninth Street, Suite 500 \nWashington, DC 20001 \n(202) 288-2069 \nrdaileader@nixonpeabody.com \nCameron Yourkowski \nDirector, Regulatory Affairs & Markets \nSunZia Transmission, LLC \n1088 Sansome Street \nSan Francisco, CA 94111 \n(503) 432-0982 \ncameron.yourkowski@patternenergy.com \nVI. \nCONCLUSION \nIn accordance with the foregoing, SunZia Transmission respectfully requests that the \nCommission accept the proposed revisions to its TO Tariff as just and reasonable and consistent \nwith its obligations under the Order to Show Cause and grant an effective date of sixty days after \nthe Commission’s order on this filing. \n \n17  \nOn April 10, 2026, SunZia Transmission filed in Docket No. ER25-170-005 a revised TO Tariff with the \nCommission with an April 9, 2026 effective date (the date on which operational control of the SunZia \nTransmission System was granted to CAISO) and incorporating the changes to the TO Tariff accepted by the \nCommission when it approved the Offer of Settlement on January 26, 2026.  SunZia Transmission, LLC, 194 \nFERC ¶ 61,069 (2026).  See note 16 supra."},{"page":7,"startToken":2936,"endToken":2976,"text":"The Honorable Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 7 of 7 \n \n4923-9080-5463.1 \n \nPlease direct any questions regarding this filing to the undersigned counsel. \n \nRespectfully submitted, \n \n/S/ Robert L. Daileader \nRobert L. Daileader \nCounsel to SunZia Transmission LLC \n \nAttachments"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":90,"startToken":0,"endToken":285},{"p":2,"at":90,"title":"I. BACKGROUND","method":"printed heading","endPage":5,"endAt":2060,"startToken":285,"endToken":2365},{"p":5,"at":2060,"title":"II. DESCRIPTION OF FILING","method":"printed heading","endPage":6,"endAt":88,"startToken":2365,"endToken":2606},{"p":6,"at":88,"title":"III. ATTACHMENTS TO FILING","method":"printed heading","endPage":6,"endAt":430,"startToken":2606,"endToken":2653},{"p":6,"at":430,"title":"IV. PROPOSED EFFECTIVE DATE","method":"printed heading","endPage":6,"endAt":1047,"startToken":2653,"endToken":2752},{"p":6,"at":1047,"title":"V. COMMUNICATIONS","method":"printed heading","endPage":6,"endAt":1484,"startToken":2752,"endToken":2808},{"p":6,"at":1484,"title":"VI. CONCLUSION","method":"printed heading","endPage":7,"endAt":293,"startToken":2808,"endToken":2976}]}