{"document":{"slug":"rec-20261116-5286-2","title":"Hayes Testimony (Exhibit No. GNY-100)","issued":"2026-11-16","accession":"20261116-5286","docket":"ER27-518-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"LS Power Grid New York Corporation INew York Independent System Operator, Inc.","kind":"attachment","file":"sources/filings/text/20261116-5286_004.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5286","tier":"record","parent":"rec-20261116-5286","sha256":"2c05f52efd032a1ffe9ac459b36c76b2f01079b4ae69f9a26dcd5bd4fa7bf8b8","pages":34,"tokens":8689,"emptyPages":[],"textThemes":["cost","study","credit","procedure"]},"pages":[{"page":1,"startToken":0,"endToken":53,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nLS Power Grid New York Corporation I \nNew York Independent System Operator, Inc. \n) \n) \n) \n) \nDocket No. ER27-___-000 \nDocket No. EL26-69-000 \n \n \n \nDIRECT TESTIMONY OF PATRICK HAYES \nON BEHALF OF \nLS POWER GRID NEW YORK CORPORATION I \nLarge Load Network Upgrade Cost Recovery \nNovember 2026"},{"page":2,"startToken":53,"endToken":91,"text":"TABLE OF CONTENTS \nI. Introduction and Experience ......................................................................................... 1 \nII. Purpose and Scope of Testimony ................................................................................ 2 \nIII. The NYISO Show Cause Order ................................................................................. 3 \nIV. NYISO Stakeholder Process ...................................................................................... 5 \nV. Cost Recovery Agreement .......................................................................................... 7 \nVI. Tariff and Protocol Revisions .................................................................................. 28"},{"page":3,"startToken":91,"endToken":113,"text":"EXHIBITS TO \nDIRECT TESTIMONY OF PATRICK HAYES \n \nExhibit No. \nDescription \nGNY-101: \nIllustrative MTRC Calculation \nGNY-102: \nExample Reconciliation Statement \nGNY-103: \nExample Charge Statement"},{"page":4,"startToken":113,"endToken":326,"text":"1 \nDIRECT TESTIMONY OF PATRICK HAYES \nI. INTRODUCTION AND EXPERIENCE \n1 \nQ. \nPLEASE STATE YOUR NAME AND BUSINESS ADDRESS. \n2 \nA. \nMy name is Patrick Hayes. My business address is 16150 Main Circle Drive, Suite 310, \n3 \nChesterfield, Missouri 63017. \n4 \nQ. \nBY WHOM ARE YOU EMPLOYED, AND WHAT ARE YOUR \n5 \nRESPONSIBILITIES? \n6 \nA. \nI am employed by LS Power and serve as Associate Vice President, Transmission \n7 \nRegulatory. I lead regulatory strategy for LS Power’s transmission business across the \n8 \nCalifornia Independent System Operator, Midcontinent Independent System Operator, PJM \n9 \nInterconnection, New York Independent System Operator, and other regional markets. My \n10 \nresponsibilities include FERC policy, regional transmission planning, competitive \n11 \ntransmission development, cost allocation and recovery, tariff development, and large-load \n12 \ninterconnection. \n13 \nQ. \nPLEASE SUMMARIZE YOUR PROFESSIONAL EXPERIENCE AND \n14 \nEDUCATION. \n15 \nA. \nI previously served as LS Power’s Director of Transmission Business Development and \n16 \nManager of Transmission Policy. Earlier in my career, I held transmission policy, energy \n17 \ntrading, and asset optimization positions with Ameren. My experience includes developing \n18 \nstrategies for competitive transmission projects and utility partnerships, negotiating \n19 \ncommercial and ownership arrangements, evaluating transmission investments, and \n20 \ncoordinating multidisciplinary teams. I received a Bachelor of Science in Accounting from \n21 \nthe University of Missouri. \n22"},{"page":5,"startToken":326,"endToken":606,"text":"2 \nQ. \nON WHOSE BEHALF ARE YOU SUBMITTING THIS TESTIMONY? \n1 \nA. \nI am testifying on behalf of LS Power Grid New York Corporation I (“LSPGNY”), a non-\n2 \nincumbent Transmission Owner in the New York Independent System Operator, Inc. \n3 \n(“NYISO”) region. LSPGNY and the New York Power Authority developed Segment A of \n4 \nthe AC Transmission Public Policy Transmission Need, a 345 kV project between the \n5 \nMarcy/Edic and New Scotland substations now in service as part of Central East Energy \n6 \nConnect. \n7 \nII. PURPOSE AND SCOPE OF TESTIMONY \n8 \nQ. \nWHAT IS THE PURPOSE OF YOUR TESTIMONY? \n9 \nA. \nI explain how LSPGNY proposes to recover the costs of Large Load-Driven Upgrades on \n10 \nits facilities and protect other transmission customers from bearing costs caused by a large \n11 \nload. LSPGNY would calculate upgrade revenue requirements under its formula rate and \n12 \nrecover the resulting amounts through NYISO under revised Rate Schedule 10. The \n13 \nrevenue requirements for Large Load-Driven Upgrades would be combined with Segment \n14 \nA’s revenue requirement in a single Regulated Transmission Facilities Charge (“RTFC”), \n15 \nusing Segment A’s existing cost allocation. For upgrades covered by this filing, where \n16 \nLSPGNY is the Connecting Transmission Owner, a Cost Recovery Agreement (“CRA”) \n17 \nestablishes the responsible Eligible Customer’s minimum revenue contribution and security \n18 \nobligations. Projected Supplemental Minimum Transmission Revenue Contribution \n19 \n(“Supplemental MTRC”) and Annual Termination Fee Remittances would be recognized as \n20 \ngeneral revenue credits in the Annual Projection. In the Annual Update, those projected \n21 \ncredits would be replaced by actual cash receipts, including applicable Security proceeds \n22 \nreceived and applied to Supplemental MTRC obligations and Annual Termination Fee \n23"},{"page":6,"startToken":606,"endToken":858,"text":"3 \nRemittances received, under the formula rate template. Segment A’s existing tariff cost \n1 \nallocation would apply to the combined RTFC, including the Large Load-Driven Upgrade \n2 \ncosts and applicable CRA revenue credits. \n3 \nI describe the Commission’s Show Cause Order, LSPGNY’s stakeholder outreach, the \n4 \nproposed CRA, and the tariff and protocol changes needed to implement it. My testimony \n5 \naddresses policy and implementation. The detailed formula-rate calculations and supporting \n6 \nworkpapers are addressed in the separate rate testimony of Eric Arzola. \n7 \nQ.  ARE YOU SPONSORING ANY EXHIBITS IN SUPPORT OF YOUR TESTIMONY \n8 \nIN THIS CASE? \n9 \nA.  Yes. I am sponsoring the following exhibits: \n10 \nExhibit No. \nDescription \nGNY-101: \nIllustrative MTRC Calculation \nGNY-102: \nExample Reconciliation Statement \nGNY-103: \nExample Charge Statement \nIII. THE NYISO SHOW CAUSE ORDER \n11 \nQ. \nWHAT DID THE COMMISSION DIRECT IN THIS PROCEEDING? \n12 \nA. \nOn June 18, 2026, the Federal Energy Regulatory Commission (“Commission” or “FERC”) \n13 \ninstituted this proceeding under section 206 of the Federal Power Act. It directed NYISO \n14 \nand the named Transmission Owners, including LSPGNY, to show cause why the NYISO \n15 \nOpen Access Transmission Tariff (“OATT”) remains just and reasonable and free of undue \n16 \ndiscrimination or preference without provisions addressing the Commission’s concerns, or \n17 \nto explain what tariff changes would remedy them if the Commission establishes a \n18 \nreplacement rate. The Commission granted a 90-day abeyance on August 14, 2026, setting \n19 \nNovember 16, 2026, as the response deadline, subject to the order’s provision for a \n20"},{"page":7,"startToken":858,"endToken":1170,"text":"4 \nrespondent that makes a timely section 205 filing addressing the preliminary findings. See \n1 \nN.Y. Indep. Sys. Operator, Inc., 195 FERC ¶ 61,216 at P 3 (2026) (“Show Cause Order”); \n2 \nOrder Granting Abeyance, Docket No. EL26-69-000, at PP 10–11 (Aug. 14, 2026). \n3 \nQ. \nWHICH ASPECTS OF THE SHOW CAUSE ORDER DOES YOUR TESTIMONY \n4 \nADDRESS? \n5 \nA. \nI address the Commission’s preliminary findings on cost transparency and cost shifting. \n6 \nThe Commission identified a risk that other transmission customers could pay for upgrades \n7 \nbuilt for a large load if that load is delayed, takes less service than requested, or never \n8 \nmaterializes. It identified public posting of upgrade and cost information and a pro forma \n9 \nCRA between the relevant Transmission Owner and the Eligible Customer as potential \n10 \nremedies. The Commission linked the minimum contribution to the requested megawatts \n11 \nthat drive the need for upgrades, sought sufficient credit support, and expected amounts \n12 \npaid under a CRA to be credited appropriately to the Transmission Owner’s revenue \n13 \nrequirement. It also contemplated a separate workpaper in the annual formula-rate \n14 \ninformational filing. See Show Cause Order at PP 72–82, 83–91. \n15 \nQ. \nWHY DO THOSE FINDINGS RAISE A DISTINCT ISSUE FOR LSPGNY? \n16 \nA. \nLSPGNY is a Transmission Owner for purposes of the NYISO tariffs under its Operating \n17 \nAgreement with NYISO. It has no franchised retail service territory or obligation to serve \n18 \nretail load and has no Transmission Service Charge (“TSC”) under Attachment H. Its \n19 \nCommission-accepted formula rate is part of Rate Schedule 10, which provides for \n20 \nrecovery of eligible projects under Attachment Y. Segment A is such a project. The \n21 \nexisting eligibility provisions do not expressly cover Network Upgrades identified to serve \n22 \na large load through the load interconnection process. Rate Schedule 10 also excludes \n23"},{"page":8,"startToken":1170,"endToken":1468,"text":"5 \nprojects undertaken through the Local Transmission Owner Planning Process. See NYISO \n1 \nService Agreement No. 2627, Operating Agreement § 1.01, Docket No. ER21-2104-000; \n2 \nNYISO OATT §§ 6.10.1, 6.10.7, 14.1, and 31.5.1.5. \n3 \nA large load can require an upgrade to an LSPGNY facility even when it connects to \n4 \nanother Transmission Owner’s system. A study or interconnection agreement can identify \n5 \nthe facilities and assign cost responsibility. LSPGNY also needs a tariff provision that \n6 \nauthorizes recovery of the associated cost of service and specifies how NYISO will bill the \n7 \nresponsible customer and credit CRA payments. That recovery mechanism is needed \n8 \nwhether LSPGNY is the Connecting Transmission Owner or an Affected Transmission \n9 \nOwner. The CRA proposed in this filing addresses LSPGNY as the Connecting \n10 \nTransmission Owner. Arrangements for LSPGNY as an Affected Transmission Owner \n11 \nremain to be resolved. \n12 \nThe local planning provisions present a separate question. Attachment Y calls for \n13 \nTransmission Owners to plan their systems, while the definitions of the Local Transmission \n14 \nOwner Plan and the Local Transmission Owner Planning Process refer to the owner’s \n15 \nTransmission District. Because LSPGNY has no obligation to serve load in a Transmission \n16 \nDistrict, OATT revisions are necessary to clarify how LSPGNY can plan upgrades to its \n17 \nown facilities on a comparable basis. See NYISO OATT §§ 1.20, 31.1.1, and 31.2.1. \n18 \nIV. NYISO STAKEHOLDER PROCESS \n19 \nQ. \nHOW DID LSPGNY ENGAGE WITH NYISO? \n20 \nA. \nLSPGNY discussed load study procedures with NYISO staff in late 2025 and participated \n21 \nin NYISO’s discussions with Transmission Owners after the Show Cause Order. In July \n22 \n2026, LSPGNY submitted questions and met with NYISO staff. In written comments on \n23"},{"page":9,"startToken":1468,"endToken":1736,"text":"6 \nNYISO’s July 23 stakeholder presentation, submitted July 27, LSPGNY requested \n1 \nadditional time for stakeholder review, urged a coordinated filing, and asked NYISO to \n2 \naddress how a Transmission Owner without retail load would participate as a Connecting \n3 \nor Affected Transmission Owner. \n4 \nNYISO and the incumbent Transmission Owners each filed a motion for abeyance on \n5 \nAugust 3. LSPGNY and New York Transmission Co., LLC jointly filed a separate motion \n6 \nthat day. The Commission granted the motions on August 14. See Order Granting \n7 \nAbeyance at PP 2, 8, 10. \n8 \nOn September 24, LSPGNY presented its proposed cost recovery framework to NYISO \n9 \nstaff and counsel. On October 8, NYISO explained that Transmission Owners should lead \n10 \nthe development of cost recovery frameworks and identified implementation work \n11 \ninvolving rate design, facility treatment, billing, revenue tracking, and collateral that would \n12 \nneed to be addressed. LSPGNY therefore proposed including the core cost-responsibility \n13 \nterms in the initial filing and addressing billing and collateral mechanics later. \n14 \nQ. \nHOW DID LSPGNY COORDINATE WITH THE OTHER TRANSMISSION \n15 \nOWNERS AND STAKEHOLDERS? \n16 \nA. \nOn July 20, 2026, LSPGNY contacted counsel for the New York Transmission Owners \n17 \n(“NYTOs”) to discuss coordinating their responses to the Show Cause Order. In a follow-\n18 \nup discussion on July 22, LSPGNY asked to participate in developing the NYTOs’ \n19 \nresponse and to join their filing. The NYTOs declined both requests. \n20 \n \nLSPGNY continued to participate in NYISO’s Transmission Owner working sessions. It \n21 \nraised two issues for an Affected Transmission Owner with no retail relationship with the \n22"},{"page":10,"startToken":1736,"endToken":2037,"text":"7 \nlarge load: how that owner would recover the costs of upgrades to its facilities and how it \n1 \nwould gain access to the financial security supporting payment of those costs. \n2 \n \nOn October 22, the NYTOs presented a proposed cost recovery and security framework \n3 \nthat relied on Section 5 of the NYISO OATT, which governs the collection of transmission \n4 \ncharges under participating Transmission Owners’ retail access tariffs. LSPGNY does not \n5 \nserve retail customers. As a result, the proposal provided no mechanism for LSPGNY to \n6 \nrecover the costs of upgrades to its facilities needed to serve a large load that takes retail \n7 \nservice from another Transmission Owner. \n \n8 \nQ. \nHOW DID THE STAKEHOLDER PROCESS AFFECT LSPGNY’S APPROACH? \n9 \nA. \nThe discussions identified the need for a rate provision that works for non-incumbent \n10 \nTransmission Owners and for NYISO settlement rules that put that provision into effect. \n11 \nThe coordinated process did not yield a joint proposal that resolved both issues for \n12 \nLSPGNY within the time available. LSPGNY is therefore presenting a separate framework \n13 \nfor upgrades where it is the Connecting Transmission Owner. Affected-system cost \n14 \nrecovery and security arrangements remain to be addressed in coordination with the other \n15 \nTransmission Owners’ proposals and, if necessary, through a subsequent filing. It is \n16 \ndesigned to work alongside NYISO’s regional study and interconnection procedures and \n17 \nthe cost recovery arrangements developed for owners with a TSC. \n18 \nV. COST RECOVERY AGREEMENT \n19 \nQ. \nWHO WOULD ENTER INTO THE CRA, AND WHAT WOULD IT COVER? \n20 \nA. \nLSPGNY proposes a pro forma CRA between LSPGNY and the Eligible Customer taking \n21 \nwholesale transmission service on behalf of the large load where LSPGNY is the \n22 \nConnecting Transmission Owner. The Large Load Customer would execute a Limited \n23"},{"page":11,"startToken":2037,"endToken":2324,"text":"8 \nAcknowledgment without becoming a party to the CRA’s wholesale payment obligations. \n1 \nNYISO would not be a CRA party; its billing, collection, security, draw, and remittance \n2 \nresponsibilities arise under the proposed Rate Schedule 10 Large Load Provisions. The \n3 \nCRA identifies each Covered Upgrade, the assigned responsibility, calculation inputs, and \n4 \npayment and security obligations. A Covered Upgrade includes an identified Large Load-\n5 \nDriven Upgrade or LSPGNY-owned ISO-Assigned Regional Project share for which the \n6 \nCRA establishes an Annual MTRC. Retail arrangements between the Eligible Customer \n7 \nand the Large Load Customer would remain governed by the applicable retail framework. \n8 \nQ. \nWHEN WILL THE CRA AND ASSOCIATED SECURITY BE IN PLACE? \n9 \nA. \nThe study results would identify the Covered Upgrades and the responsibility to be \n10 \ndocumented in the CRA and applicable construction or interconnection arrangements. \n11 \nExecution or authorized effectiveness of those arrangements, and delivery of the required \n12 \nconstruction security, will precede the construction commitments they secure. Operational \n13 \nsecurity will support the remaining revenue commitment after the applicable upgrade enters \n14 \nservice. The CRA establishes the applicable deadlines, conditions for proceeding, and \n15 \nremedies if the Eligible Customer fails to execute the required arrangements, post security, \n16 \nor maintain it. Those requirements protect against LSPGNY incurring an unsecured \n17 \nobligation in reliance on the large load. \n18 \nQ. \nHOW WOULD THE FRAMEWORK APPLY WHEN THE LARGE LOAD \n19 \nCONNECTS TO ANOTHER TRANSMISSION OWNER’S SYSTEM? \n20 \nA. \nA large load connecting to another Transmission Owner’s system may require an upgrade \n21 \nto an LSPGNY facility. The applicable study would identify the required upgrade and the \n22 \nresponsibility attributable to the request. The proposed CRA in this filing, however, covers \n23"},{"page":12,"startToken":2324,"endToken":2605,"text":"9 \nLSPGNY as the Connecting Transmission Owner; it does not establish a CRA for \n1 \nLSPGNY as an Affected Transmission Owner. The appropriate arrangement will depend \n2 \non the scope of the other Transmission Owners’ proposed agreements and the associated \n3 \ntariff provisions. \n4 \n \nLSPGNY needs a mechanism to recover its affected-system upgrade costs and obtain \n5 \naccess to the supporting security without a retail service relationship with the end-use load. \n6 \nIf the other Transmission Owners’ proposed agreements do not provide that mechanism, a \n7 \nseparate affected-system CRA may need to be added as another appendix to Attachment 1 \n8 \nof Rate Schedule 10 through a subsequent filing. This filing should not be understood as \n9 \nresolving that remaining issue. \n10 \nQ. \nHOW WOULD LSPGNY ASSIGN AND RECOVER THE COST OF A LARGE \n11 \nLOAD-DRIVEN UPGRADE? \n12 \nA. \nThe applicable study would identify the upgrades needed to serve the requested load and \n13 \nthe costs attributable to that request. The CRA documents the Eligible Customer’s \n14 \nresponsibility for the applicable Covered Upgrades, including assigned shares where \n15 \nmultiple requests contribute to the need for an upgrade. That contractual responsibility is \n16 \ndistinct from the allocation of LSPGNY’s formula-rate revenue requirement under Rate \n17 \nSchedule 10. Under LSPGNY’s proposed approach, the revenue requirements for Large \n18 \nLoad-Driven Upgrades would be combined with Segment A’s revenue requirement in a \n19 \nsingle RTFC and allocated using Segment A’s existing tariff cost allocation. There would \n20 \nbe no separate zonal or subzonal allocation for an individual Large Load-Driven Upgrade. \n21 \nSupplemental MTRC and Annual Termination Fee Remittances would reduce the \n22 \ncombined revenue requirement as general revenue credits under the formula rate template. \n23"},{"page":13,"startToken":2605,"endToken":2886,"text":"10 \nThe costs and those credits would therefore be reflected in the same RTFC using the same \n1 \nallocation. \n2 \n \nThe existing RTFC allocation is the established mechanism for collecting LSPGNY’s \n3 \nCommission-authorized revenue requirement. Its use does not rest on a finding that the \n4 \nResponsible LSEs caused the Large Load Facility or its service request. The CRA \n5 \nseparately assigns the responsible Eligible Customer an Annual MTRC, satisfied through \n6 \nQualifying Transmission Revenues and Supplemental MTRC. The formula rate credits the \n7 \napplicable Large Load CRA Revenue against LSPGNY’s revenue requirement. These \n8 \nprovisions are intended to mitigate cost shifting to other Responsible LSEs, subject to the \n9 \nrelationship between the contractual commitment and actual cost of service described \n10 \nbelow. \n11 \n \nWhere more than one Large Load Facility drives an upgrade, Schedule 1 identifies an \n12 \nInitial Allocation Percentage for each Large Load Customer using the applicable final study \n13 \nand allocation methodology. That allocation accounts for individually and jointly studied \n14 \nloads; their requested service levels, development phases, and facility configurations; and \n15 \nany portion serving other system needs or customers. Aggregate allocations to Large Load \n16 \nCustomers may not exceed one hundred percent. Any unallocated portion remains subject \n17 \nto the otherwise applicable Rate Schedule 10 cost-allocation and recovery rules.  \n18 \nLSPGNY would calculate the annual cost of service through its formula rate, including \n19 \nreturn on net rate base, depreciation, taxes, and allocable operating and administrative \n20 \nexpenses, subject to applicable credits. NYISO would recover the resulting revenue \n21 \nrequirement through Rate Schedule 10 and separately bill the Eligible Customer for \n22 \nSupplemental MTRC under the CRA. LSPGNY proposes to retain the requirement for \n23"},{"page":14,"startToken":2886,"endToken":3189,"text":"11 \nCommission acceptance of a section 205 filing adding each Large Load-Driven Upgrade to \n1 \nTable 1 before its revenue requirement could be included in the RTFC. Listing an upgrade \n2 \nwould identify the investment eligible for recovery; it would not establish a separate cost \n3 \nallocation for that upgrade. LSPGNY’s recovery would be determined under its formula \n4 \nrate, including the credits for CRA revenue. The Annual Update would credit Supplemental \n5 \nMTRC actually received, including applicable Security proceeds received and applied to \n6 \nthat obligation, rather than amounts merely billed. An amount not collected or satisfied \n7 \nfrom Security would not reduce LSPGNY’s actual formula-rate revenue requirement as a \n8 \nrevenue credit. The resulting difference from the projected credit would be reflected in the \n9 \nordinary formula-rate true-up and included in the next Annual Projection prepared after the \n10 \nAnnual Update, with ordinary true-up interest. The Eligible Customer would remain liable, \n11 \nand any later recovery would be credited when received. Other transmission customers \n12 \ncould therefore bear a collection shortfall through the RTFC pending a later recovery; the \n13 \nCRA’s payment and security obligations mitigate that exposure but do not eliminate it. \n14 \nCommission acceptance of each Table 1 designation provides an opportunity to evaluate \n15 \nthe particular upgrade, its supporting study record, and the application of the CRA \n16 \nprotections before its revenue requirement enters the RTFC. \n17 \nThe CRA does not determine whether a facility is directly assigned or included in rate base. \n18 \nThat determination is made under the applicable NYISO tariff, study process, and \n19 \ninterconnection arrangements. Direct Assignment Facilities and other facilities whose costs \n20 \nare directly assigned to and paid by the Eligible Customer, and are not included in \n21 \nLSPGNY’s rate base, are excluded from the definition of Large Load-Driven Upgrades and \n22"},{"page":15,"startToken":3189,"endToken":3476,"text":"12 \nthe MTRC framework. See the CRA definition of “Large Load-Driven Upgrades” and \n1 \nSection 6.2. \n2 \nCovered Upgrades are separately identified in the formula rate and use the capital structure \n3 \nand generally applicable return components applicable to LSPGNY under Rate Schedule \n4 \n10, including any Commission-approved generally applicable ROE incentive, as applicable. \n5 \nThey do not receive incentives specific to the AC Transmission Project or become subject \n6 \nto that project’s Competitive Bid Concession, cost cap, or other project-specific cost-\n7 \ncontainment commitments. See CRA Section 6.2 and Eric Arzola’s rate testimony. \n8 \nQ. \nHOW WOULD THE MINIMUM CONTRIBUTION WORK? \n9 \nA. \nThe CRA establishes an Annual Minimum Transmission Revenue Contribution (“Annual \n10 \nMTRC”) for each Covered Upgrade using the separate MTRC Calculation Template in \n11 \nSchedule 5. The calculation uses a levelized fixed charge rate (“FCR”) over a twenty-year \n12 \nMTRC Term, applied to the assigned capital cost, with the capital recovery, income-tax, \n13 \nand other capital-related components specified in Schedule 5, plus any fixed annual \n14 \ncomponents not included in the FCR. The calculation excludes the Segment A project-risk \n15 \nincentive adder. Estimated capital cost would initially support an Estimated Annual MTRC. \n16 \nLSPGNY would establish the Final Annual MTRC using actual capital cost within one year \n17 \nafter the Covered Upgrade enters service, with estimated charges reconciled under the \n18 \nCRA. The finalized contractual MTRC would not be reset through routine annual formula-\n19 \nrate updates, subject to the CRA’s expressly permitted adjustments. \n20 \nQ. \nWHY DOES LSPGNY PROPOSE A TWENTY-YEAR, LEVELIZED MTRC? \n21 \nA. \nA large-load request may require a substantial transmission investment before the load \n22 \nreaches its expected operating level. A twenty-year commitment provides an extended \n23"},{"page":16,"startToken":3476,"endToken":3786,"text":"13 \nperiod of customer accountability for that investment, while establishing a defined period \n1 \nover which the Eligible Customer can evaluate its obligation. Levelization spreads the \n2 \ncalculated revenue contribution over that period rather than concentrating it in the initial \n3 \nyears. The purpose is to secure a meaningful contribution toward the investment \n4 \nundertaken for the requested service and reduce the exposure of other customers if the load \n5 \nis delayed, reduced, or discontinued. \n6 \n \nThe twenty-year MTRC Term is a contractual revenue-support period. Under CRA \n7 \nSections 3.2 and 6.7, earlier Break-Even is available if a final Reconciliation Statement \n8 \ndetermines that the Total Required Revenue Commitment has been satisfied before the end \n9 \nof that term. Operational payment and security obligations then terminate, subject to final \n10 \ntrue-ups and correction of errors or fraud for periods before satisfaction. Once finally \n11 \nsatisfied, the responsibility does not revive because of a later change in return on equity, \n12 \nexpense, load, forecast, or other formula-rate input. It does not establish the upgrade’s \n13 \naccounting depreciation rate or require removal of the facility from rate base at the end of \n14 \nthat term. The facility’s continued inclusion in the formula rate would remain governed by \n15 \nthe applicable tariff and Commission requirements. Amounts recovered under the CRA \n16 \nwould receive the credits and other treatment provided in the formula rate template so that \n17 \nthe contractual commitment does not create duplicate recovery. \n18 \n \nThe twenty-year term is supported by Operational Security based on the remaining \n19 \nCumulative Revenue Responsibility and, when the applicable termination provisions are \n20 \ntriggered, a Termination Fee equal to the remaining contractual commitment less any \n21 \nSupplemental MTRC already billed and remaining unpaid. Those unpaid bills remain \n22 \nseparately payable and are not discharged by payment of the Termination Fee. It does not \n23"},{"page":17,"startToken":3786,"endToken":4066,"text":"14 \neliminate all risk over the Covered Upgrade’s depreciable life. Neither a levelized Annual \n1 \nMTRC nor the single-year illustration below, standing alone, demonstrates that the total \n2 \ncommitment equals or exceeds the upgrade’s cost of service over its entire life. Such a \n3 \nconclusion would require a comparison using consistent cost, revenue, timing, and \n4 \ndiscount-rate assumptions. \n5 \nQ. \nWHY CAN THE FIXED ANNUAL MTRC DIFFER FROM THE UPGRADE’S \n6 \nANNUAL FORMULA-RATE REVENUE REQUIREMENT? \n7 \nA. \nThe Annual MTRC is a levelized contractual amount calculated using the inputs specified \n8 \nin the CRA. The formula rate separately determines the annual cost of service using the \n9 \napplicable rate base, depreciation, expenses, taxes, return, and credits. As net plant declines \n10 \nand other formula-rate inputs change, the annual cost of service can differ from the fixed \n11 \ncontractual amount. The Annual MTRC is therefore not a representation that the \n12 \ncustomer’s minimum contribution will equal the actual incremental revenue requirement in \n13 \nevery year. \n14 \n \nThe effect on other customers depends on the actual revenue requirement, qualifying large-\n15 \nload revenues, Supplemental MTRC, and the credit and allocation provisions in the \n16 \ntemplate and tariff. The contractual floor, security, and reconciliation provisions mitigate \n17 \nexposure to the large load; they do not support an unconditional assurance that every other \n18 \ncustomer’s rate will remain unchanged under every operating or cost scenario. \n19 \nQ. \nWHY DOES THE FIXED CHARGE CALCULATION INCLUDE CAPITAL \n20 \nRECOVERY, INCOME TAXES, AND OTHER SPECIFIED COMPONENTS? \n21 \nA. \nCapital cost alone does not measure the full revenue contribution associated with an \n22 \nupgrade. Schedule 5 calculates the Annual MTRC using a levelized capital charge rate plus \n23"},{"page":18,"startToken":4066,"endToken":4357,"text":"15 \nan expense allocator, consistent with the FCR worksheet in Exhibit No. GNY-101. The \n1 \ncalculation first determines an after-tax discount rate using the applicable capital structure, \n2 \nreturn on equity, cost of debt, and composite income-tax rate. It then subtracts the present \n3 \nvalue of federal and state tax-depreciation benefits from allocated capital cost and applies \n4 \nan income-tax revenue conversion factor. The resulting present-value capital revenue \n5 \nrequirement is annualized over the twenty-year MTRC Term using the after-tax discount \n6 \nrate and divided by allocated capital cost to determine the levelized capital charge rate. The \n7 \nexpense allocator reflects operating and maintenance expense, less project-specific \n8 \nregulatory asset amortization included in that expense, plus taxes other than income taxes, \n9 \ndivided by total gross transmission plant in service. The levelized capital charge rate and \n10 \nexpense allocator are each rounded to six decimal places and added to determine the Fixed \n11 \nCharge Rate. The Annual MTRC equals allocated capital cost multiplied by that rate, plus \n12 \nany separately identified fixed annual costs not already included. Supporting workpapers \n13 \nidentify the inputs, their sources, and each calculation, and prevent duplicate inclusion of \n14 \nany cost. \n15 \n \nThe FCR calculation establishes the contractual minimum contribution; it is not an \n16 \nadditional formula-rate charge imposed on top of the same cost of service without an offset. \n17 \nLSPGNY would continue to calculate its revenue requirement through the formula rate, \n18 \nand Supplemental MTRC and other applicable amounts would receive the treatment \n19 \nspecified in the template. Schedule 5 and its supporting workpapers provide the contractual \n20 \ncalculation and input reconciliation; the separate rate testimony of Eric Arzola explains \n21 \nhow the resulting Annual MTRC is used in the formula rate template. \n22"},{"page":19,"startToken":4357,"endToken":4639,"text":"16 \nThe MTRC is a contractual revenue floor calculated separately from LSPGNY’s annual \n1 \nformula-rate cost of service. Supplemental MTRC is the greater of zero and the applicable \n2 \nAnnual MTRC less Qualifying Transmission Revenues for the corresponding period. The \n3 \nCRA and Schedule 2 define the qualifying RTFC revenues attributable to the Large Load \n4 \nFacility and the methodology for attributing or allocating those revenues among Covered \n5 \nUpgrades. Each dollar would count only once. LSPGNY would maintain customer- and \n6 \nCovered Upgrade-specific records of the commitment and its satisfaction. That tracking \n7 \ndoes not require formula-rate credits to be applied exclusively to the revenue requirement \n8 \nof the corresponding upgrade. Instead, CRA revenue is a general revenue credit that \n9 \nreduces LSPGNY’s overall revenue requirement rather than the revenue requirement of any \n10 \nindividual Covered Upgrade. \n11 \nQualifying Transmission Revenues are not a separate retail or load-based charge imposed \n12 \nby LSPGNY. They are the portion of RTFC revenues assessed on the Large Load Facility’s \n13 \nActual Energy Withdrawals, collected from the Responsible LSE or LSEs serving that \n14 \nfacility, and remitted to LSPGNY that is attributable to the applicable Covered Upgrade \n15 \nand reduces the RTFC otherwise collected from other Responsible LSEs. Schedule 2 \n16 \nprovides the methodology using the applicable metering data, RTFC rate, Load Zone or \n17 \nSubzone allocation, and Covered Upgrade Revenue Share.  \n18 \nQ. \nDOES THE CRA REPLACE ORDINARY TRANSMISSION-SERVICE PAYMENT \n19 \nOR COLLATERAL OBLIGATIONS? \n20 \nA. \nNo. The Eligible Customer and the transmission customers responsible for the combined \n21 \nRTFC would remain subject to their respective payment obligations under the applicable \n22 \ntransmission tariffs. The CRA determines which qualifying RTFC revenues attributable to \n23"},{"page":20,"startToken":4639,"endToken":4915,"text":"17 \nthe Large Load Facility satisfy the minimum contribution. Supplemental MTRC would be \n1 \ndue only for the positive difference between the applicable Annual MTRC and those \n2 \nqualifying revenues. It would not replace ordinary transmission charges or permit the same \n3 \nrevenue to be credited twice. \n4 \n \nCRA security supports the obligations established by that agreement. Ordinary \n5 \ntransmission-service credit requirements continue to apply under the governing tariff. \n6 \nQualifying retail security support may satisfy the corresponding CRA security exposure \n7 \nonly to the extent the CRA and tariff recognize it and the support is legally available when \n8 \nneeded.  \n9 \nQ. \nHOW WOULD PROJECTED AND ACTUAL AMOUNTS BE RECONCILED? \n10 \nA. \nLSPGNY would include the projected Supplemental MTRC, including any prior-period \n11 \ntrue-up adjustment, and any projected Annual Termination Fee Remittances as a credit in \n12 \nthe Annual Projection in accordance with the formula rate template, and NYISO would bill \n13 \nand remit the applicable customer-specific amounts under the tariff and CRA. In the \n14 \nAnnual Update, that projected credit would be replaced by Supplemental MTRC cash \n15 \nreceipts and Annual Termination Fee Remittances actually received during the Rate Year, \n16 \nsupported by billing, cash-receipt, and settlement records. Supplemental MTRC receipts \n17 \nwould include applicable Security proceeds received and applied to Supplemental MTRC \n18 \nobligations and later collections of amounts billed in earlier years, counted once. \n19 \nDifferences between projected credits and actual receipts would flow through the ordinary \n20 \nformula-rate true-up. The separate customer-level reconciliation would continue to \n21 \ncompare amounts billed with the contractual amount due; nonpayment would not itself \n22 \ncreate an additional customer-level charge. The CRA Reconciliation Statement compares \n23"},{"page":21,"startToken":4915,"endToken":5193,"text":"18 \nthe Supplemental MTRC billed for the Rate Year, excluding any prior-period true-up \n1 \nadjustment included in that billing, with the actual Supplemental MTRC determined from \n2 \nactual Qualifying Transmission Revenues. The difference, calculated without interest, \n3 \nwould be carried into the Eligible Customer’s projected Supplemental MTRC in the next \n4 \nAnnual Projection as a prior-period true-up adjustment. If no further Supplemental MTRC \n5 \nwill be billed under the CRA, LSPGNY would include any under-billed amount in a \n6 \nCharge Statement and refund any over-billed amount to the Eligible Customer, in each case \n7 \nwithout interest. The Reconciliation Statement would serve as a supporting worksheet \n8 \nrather than impose an additional charge or duplicate a template calculation. This annual \n9 \nreconciliation is separate from finalizing the MTRC using actual capital cost. An example \n10 \nCRA Reconciliation Statement is provided as Exhibit No. GNY-102. \n11 \nQ. \nWHY SHOULD PROJECTED SUPPLEMENTAL MTRC BE REFLECTED IN THE \n12 \nANNUAL PROJECTION? \n13 \nA. \nReflecting projected Supplemental MTRC allows the expected contribution to reduce the \n14 \namount initially recovered from other transmission customers under the template. If the \n15 \ncontribution were excluded until after receipt and a later true-up, those customers could \n16 \ntemporarily bear amounts that the CRA assigns to the Eligible Customer. The projection \n17 \nuses the expected upgrade in-service dates, load, qualifying revenues, and applicable \n18 \nAnnual MTRC. Those assumptions are subject to reconciliation when actual information \n19 \nbecomes available. \n20 \n \nForecasts can overstate or understate the actual contribution. The Reconciliation Statement \n21 \nwould identify the difference between the Supplemental MTRC billed for the Rate Year, \n22 \nexcluding any prior-period true-up adjustment included in that billing, and the actual \n23"},{"page":22,"startToken":5193,"endToken":5500,"text":"19 \nSupplemental MTRC, and that difference would be billed or credited to the Eligible \n1 \nCustomer through the next Annual Projection, or directly billed or refunded without \n2 \ninterest if no further Supplemental MTRC will be billed under the CRA. This approach \n3 \ncombines timely recognition of the expected customer contribution with correction of \n4 \nforecast differences at the customer level. Collection risk is treated separately. Because the \n5 \nAnnual Update credits actual cash receipts, a delayed or unpaid amount not satisfied from \n6 \nSecurity would reduce the actual revenue credit and could increase the amount recovered \n7 \nfrom other customers through the ordinary formula-rate true-up, with applicable interest. \n8 \nThe unpaid amount would remain owed by the Eligible Customer and subject to the CRA’s \n9 \npayment and security provisions. Any later recovery would be credited in the year received, \n10 \nwithout duplicating a previously recognized receipt. The principal reason for projected \n11 \ntreatment is timely protection of other customers, supported by transparent reconciliation. \n12 \nQ. \nHOW WOULD THE PROJECTION AND RECONCILIATION PROCESS \n13 \nOPERATE OVER TIME? \n14 \nA. \nBefore Rate Year Y, the Annual Projection would include the projected revenue \n15 \nrequirement and a credit for the projected Supplemental MTRC and any Annual \n16 \nTermination Fee Remittances for that year. By October 31 preceding Rate Year Y, \n17 \nLSPGNY would deliver a Charge Statement to NYISO, and during Rate Year Y, NYISO \n18 \nwould bill the projected Supplemental MTRC in twelve equal monthly installments under \n19 \nthe tariff and CRA. By June 30 of Rate Year Y+1, LSPGNY would prepare the Annual \n20 \nUpdate using actual information for Rate Year Y, together with a Reconciliation Statement \n21 \nidentifying the prior-period true-up adjustment. That adjustment would be included in the \n22 \nnext Annual Projection and therefore billed during Rate Year Y+2, under the timetable \n23"},{"page":23,"startToken":5500,"endToken":5796,"text":"20 \nspecified in the template and tariff. Separately, the Annual Update in Rate Year Y+1 would \n1 \nreplace the projected CRA revenue credit for Rate Year Y with actual receipts during Rate \n2 \nYear Y. The resulting ordinary formula-rate true-up, including applicable interest, would be \n3 \nincluded in the Annual Projection prepared in Y+1 for recovery or credit in Rate Year Y+2. \n4 \nA later collection would be recognized as a revenue credit in the year received and \n5 \nreconciled through that year’s Annual Update. Workpapers would identify the billing year \n6 \nand receipt year so that a later collection is not mistaken for a new obligation or credited \n7 \ntwice. An example Charge Statement illustrating the billing instructions LSPGNY would \n8 \ndeliver to NYISO is provided as Exhibit No. GNY-103. \n9 \nQ. \nHOW WOULD INTEREST APPLY TO RECONCILIATION ADJUSTMENTS? \n10 \nA. \nThe customer-level true-up of the difference between the Supplemental MTRC billed for \n11 \nthe Rate Year, excluding any prior-period true-up adjustment included in that billing, and \n12 \nthe actual Supplemental MTRC would not bear interest in either direction. That adjustment \n13 \nchanges the Eligible Customer’s share of the cost, not LSPGNY’s own revenue \n14 \nrequirement. Interest calculated under 18 C.F.R. § 35.19a would apply to an amount \n15 \ndetermined through a dispute to have been overbilled. The ordinary formula-rate over- or \n16 \nunder-recovery resulting from differences between projected Large Load CRA Revenue \n17 \nand actual cash receipts, including collection shortfalls and later recoveries, would be \n18 \nsubject to the ordinary formula-rate true-up interest provisions. That interest would apply \n19 \nthrough the formula-rate true-up and would not impose interest on the separate customer-\n20 \nlevel Supplemental MTRC reconciliation. The template and supporting workpapers \n21 \ndistinguish these types of adjustments. \n22"},{"page":24,"startToken":5796,"endToken":6085,"text":"21 \nQ. \nCAN YOU ILLUSTRATE THE SUPPLEMENTAL MTRC CALCULATION? \n1 \nA. \nExhibit No. GNY-204, Attachment 1a, illustrates an Annual MTRC of $7,320,060 and \n2 \nprojected Qualifying Transmission Revenues of $6,132,000 for Customer A’s Large Load \n3 \nProject 1, producing projected Supplemental MTRC of $1,188,060 before prior-period \n4 \nadjustments. The qualifying-revenue forecast uses 400 MW, 8,760 annual billing hours, \n5 \nand an illustrative qualifying transmission rate of $1.75 per MWh. A prior-period true-up \n6 \nadjustment of $307,440 increases the projected amount to be billed for that Covered \n7 \nUpgrade to $1,495,500. The example assumes a full modeled Rate Year of 2030. Applying \n8 \nthe illustrative Annual MTRC over a full twenty-year term produces an unadjusted Total \n9 \nRequired Revenue Commitment of $146,401,200. These are illustrative assumptions rather \n10 \nthan amounts established for an actual customer. A separate populated CRA calculation \n11 \nexhibit is provided with my testimony as GNY-101 and reconciles to the applicable \n12 \nassumptions in GNY-204. \n13 \nQ. \nHOW WOULD MULTIPLE COVERED UPGRADES WITH DIFFERENT IN-\n14 \nSERVICE DATES AFFECT THE COMMITMENT? \n15 \nA. \nEach Covered Upgrade would have its own applicable in-service date, Annual MTRC, and \n16 \ntwenty-year MTRC Term, subject to earlier final satisfaction of its cumulative revenue \n17 \nresponsibility under CRA Sections 3.2 and 6.7. The obligation for a Rate Year would \n18 \nreflect the Covered Upgrades then subject to the commitment, with the applicable partial-\n19 \nyear proration. As additional upgrades enter service, their contributions would be added to \n20 \nthe customer’s combined annual obligation. The same approach would identify when each \n21 \nupgrade’s term ends. An upgrade that has not yet entered service would remain subject to \n22"},{"page":25,"startToken":6085,"endToken":6361,"text":"22 \nthe applicable construction-security and cancellation provisions rather than being treated as \n1 \nthough it had already begun its operational MTRC Term. \n2 \n \nCustomer- and Covered Upgrade-specific workpapers show the applicable terms, proration, \n3 \nqualifying-revenue attribution or allocation, and resulting Supplemental MTRC. \n4 \nAggregating the presentation would not erase each Covered Upgrade’s separate term or \n5 \npermit the same qualifying revenue to satisfy more than one obligation. \n6 \nQ. \nWHAT CALCULATION MATERIALS SUPPORT THE CRA? \n7 \nA. \nSchedule 5 includes an unpopulated MTRC Calculation Template and the supporting FCR \n8 \ncalculation needed to derive the Annual MTRC. A separate populated illustration is \n9 \nprovided as an exhibit to my testimony as GNY-101, rather than included in the pro forma \n10 \nCRA, and will show how the inputs produce the Annual MTRC, Supplemental MTRC, \n11 \nTotal Required Revenue Commitment, and projected security balances. The supporting \n12 \ncalculations permit review and replication of the contractual calculation. \n13 \n \nThe supplemental ratepayer-protection illustration below compares the combined RTFC \n14 \nwith and without CRA revenue credits and demonstrates how the supplemental obligation \n15 \nchanges when qualifying load falls short. It uses disclosed assumptions and is separate from \n16 \nthe formal CRA calculation exhibit. It does not allocate the illustrated benefit among \n17 \ncustomers. \n18 \nQ. \nWHAT DOES THE NUMERICAL ILLUSTRATION DEMONSTRATE? \n19 \nA. \nThe proposed CRA revenue credits reduce the combined RTFC by $6,195,840 under the \n20 \nassumptions in Exhibit No. GNY-204. This illustration holds the same investment, load, \n21 \nordinary revenue credits, and formula-rate true-up constant. It isolates the effect of CRA \n22 \nsupport rather than comparing the upgrades against a system in which they were never \n23"},{"page":26,"startToken":6361,"endToken":6655,"text":"23 \nbuilt. Table 1 presents the comparison for the illustrative Rate Year 2030. The table shows \n1 \nprojected CRA revenue credits; in an Annual Update, the credits would reflect actual cash \n2 \nreceipts. Any collection shortfall would affect the ordinary formula-rate true-up rather than \n3 \nchange the Eligible Customer’s underlying obligation. \n4 \nTable 1. Reduction in the Combined RTFC1 \nAnnual calculation \nWithout CRA credits \nWith CRA credits \nGross formula-rate revenue requirement \n$144,314,351 \n$144,314,351 \nOrdinary revenue credits \n($100,000) \n($100,000) \nSupplemental MTRC including prior-period \nadjustments \n$0 \n($2,622,030) \nAnnual Termination Fee Remittances \n$0 \n($3,573,810) \nFormula-rate true-up adjustment \n$702,705 \n$702,705 \nCombined RTFC \n$144,917,056 \n$138,721,216 \nReduction in combined RTFC \n— \n$6,195,840 \n \nThe reduction equals approximately 4.28% of the otherwise applicable combined RTFC. \n5 \nOf the $2,622,030 projected Supplemental MTRC credit, $2,545,410 represents current-\n6 \nyear Supplemental MTRC and $76,620 represents net prior-period adjustments. The \n7 \n$3,573,810 termination credit is the annual remittance from funds held by NYISO, not the \n8 \nentire termination fee. \n9 \n \nThe $6,195,840 is a reduction in the combined RTFC, including any portion paid on behalf \n10 \nof large loads. Segment A’s existing tariff cost allocation would apply to the reduced RTFC \n11 \nas described in my testimony. This example does not quantify how the reduction is \n12 \ndistributed among customers or the savings realized exclusively by other customers. \n13 \n \n1 Source: Exhibit No. GNY-204, Appendix A, Lines 1–5 and Large Load CRA Revenue Lines a–c; Attachment 1a, \nLines 1–4 and 11–13. Ordinary revenue credits equal total revenue credits less Large Load CRA Revenue. Amounts \nare calculated at full precision and displayed in whole dollars."},{"page":27,"startToken":6655,"endToken":6939,"text":"24 \nQ. \nHOW DOES THE FRAMEWORK RESPOND WHEN THE LARGE LOAD TAKES \n1 \nLESS SERVICE THAN EXPECTED? \n2 \nA. \nProject 1 assumes $60 million of capital cost, a $7,320,060 Annual MTRC, 8,760 billing \n3 \nhours, and an illustrative qualifying rate of $1.75/MWh. The upgrade is in service for the \n4 \nfull year in each condition. Prior-period adjustments are excluded to isolate the annual \n5 \nobligation. Table 2 compares expected load, reduced use after service begins, and delayed \n6 \nload commencement. \n7 \nTable 2. Project Load Shortfall Illustration2 \nAnnual calculation \nExpected load \nReduced load \nDelayed load \nQualifying load \n400 MW \n200 MW \n0 MW \nQualifying Transmission Revenues \n$6,132,000 \n$3,066,000 \n$0 \nAnnual MTRC \n$7,320,060 \n$7,320,060 \n$7,320,060 \nSupplemental MTRC \n$1,188,060 \n$4,254,060 \n$7,320,060 \nQualifying revenues plus \nSupplemental MTRC \n$7,320,060 \n$7,320,060 \n$7,320,060 \n \nQualifying Transmission Revenues = qualifying MW × 8,760 × $1.75/MWh. Supplemental \n8 \nMTRC = the positive difference between Annual MTRC and Qualifying Transmission \n9 \nRevenues. The 200 MW condition represents reduced use after service begins; the 0 MW \n10 \ncondition represents delayed commencement after the upgrade enters service. \n11 \n \nThe qualifying rate is held constant to isolate the shortfall mechanism. This is not a \n12 \ncalculation of actual NYISO billing rates, billing denominators, or customer shares. \n13 \nQualifying revenues reduce the supplemental obligation; they are not credited a second \n14 \ntime against the formula-rate revenue requirement. \n15 \n \n2 Source: GNY-101, CRA Exhibit, Annual MTRC and Project 1 inputs; Exhibit No. GNY-204, Attachment 1a, Line \n1 and qualifying-revenue workpaper Line 14. The 200 MW and 0 MW conditions are additional illustrative \nassumptions."},{"page":28,"startToken":6939,"endToken":7239,"text":"25 \n \nThe responsible Eligible Customer’s supplemental obligation increases as qualifying \n1 \nrevenues decline. For Project 1, reducing qualifying load from 400 MW to 200 MW lowers \n2 \nqualifying revenues by $3,066,000 and increases annual Supplemental MTRC by the same \n3 \namount, from $1,188,060 to $4,254,060. If the upgrade is in service but the load has not \n4 \ncommenced service for the full year, the annual supplemental obligation equals the \n5 \n$7,320,060 Annual MTRC. These amounts represent the annual obligation as finally \n6 \nreconciled. Forecast differences can affect billing timing, with the customer-level \n7 \nadjustment reflected in Rate Year Y+2. Security supports payment but posting security is \n8 \nnot itself a revenue credit. The illustration shows the contractual amounts due, rather than \n9 \ncash collections. Any unpaid amount not satisfied from Security would be excluded from \n10 \nthe actual revenue credit and reflected in the ordinary formula-rate true-up, with applicable \n11 \ninterest; a later recovery would be credited when received. \n12 \nQ. \nHOW WOULD THE CRA ADDRESS CANCELLATION AND DEFAULT? \n13 \nA. \nBefore a Covered Upgrade enters service, construction security would cover the costs and \n14 \ncancellation exposure specified in the CRA. After the Covered Upgrade enters service, \n15 \nRequired Operational Security would equal the nominal Remaining Cumulative Revenue \n16 \nResponsibility, except to the extent satisfied by qualifying retail security support. The Total \n17 \nRequired Revenue Commitment is based on the applicable Annual MTRC over its twenty-\n18 \nyear term. Recognized Qualifying Transmission Revenues, Supplemental MTRC receipts, \n19 \napplied security proceeds, and other permitted adjustments would reduce the remaining \n20 \ncommitment without double counting. Exhibit GNY-101 provided with my testimony \n21 \nincludes a forecast security schedule illustrating expected reductions assuming settlement; \n22 \nprojected collections alone do not discharge the secured obligation. \n23"},{"page":29,"startToken":7239,"endToken":7530,"text":"26 \nNYISO would hold and draw security under the proposed tariff provisions, and LSPGNY \n1 \nwould maintain the Cumulative Revenue Ledger and provide the required supporting \n2 \ncalculations and notices. These arrangements provide timely access and remittance for \n3 \nupgrades covered by the proposed CRA where LSPGNY is the Connecting Transmission \n4 \nOwner. Comparable arrangements for LSPGNY as an Affected Transmission Owner \n5 \nremain to be resolved. Qualifying retail security support could satisfy the corresponding \n6 \nwholesale security requirement only to the extent it is legally available for that obligation \n7 \nunder the CRA and tariff. Security does not limit the Eligible Customer’s underlying \n8 \nliability, and LSPGNY’s tariff recovery would remain subject to the applicable \n9 \nCommission-approved recovery provisions. \n10 \nQ. \nHOW WOULD TERMINATION FUNDS BE HANDLED AFTER AN UPGRADE \n11 \nENTERS SERVICE? \n12 \nA. \nUnder CRA Section 3.3.4, when the applicable termination provisions are triggered, the \n13 \nEligible Customer owes a Termination Fee equal to the Remaining Cumulative Revenue \n14 \nResponsibility less any Supplemental MTRC already billed and remaining unpaid as of the \n15 \neffective termination or cessation date. Those unpaid bills remain separately payable as \n16 \nLarge Load Charges. NYISO’s receipt of the Termination Fee in full, including qualifying \n17 \napplied security proceeds, would discharge only the remaining contractual revenue \n18 \nresponsibility included in that fee; it would not discharge the billed and unpaid \n19 \nSupplemental MTRC excluded from the fee. NYISO would hold the fee in a segregated \n20 \nTermination Fee Account and remit it to LSPGNY over the remaining MTRC Term under \n21 \nCRA Section 3.3.6. Each Annual Termination Fee Remittance would equal the Annual \n22 \nMTRC for the Covered Upgrade for each Rate Year remaining in its MTRC Term, prorated \n23"},{"page":30,"startToken":7530,"endToken":7822,"text":"27 \nfor partial Rate Years, until the balance is exhausted. Any balance remaining at the end of \n1 \nthe MTRC Term, including actual account earnings, would be remitted with the final \n2 \nremittance. The full fee would not immediately become an LSPGNY formula-rate credit. \n3 \nEach Annual Termination Fee Remittance would be projected in the Annual Projection and \n4 \nreflected as a general revenue credit in the Annual Update for the Rate Year in which \n5 \nLSPGNY actually receives it, and would not reduce the contractual commitment a second \n6 \ntime. Actual earnings on held termination funds are distinct from interest on customer-level \n7 \nreconciliation adjustments. \n8 \nQ. \nHOW WOULD THE FORMULA RATE PREVENT DUPLICATE RECOVERY? \n9 \nA. \nLSPGNY would separately track assigned upgrade costs, Qualifying Transmission \n10 \nRevenues, Supplemental MTRC billed, Supplemental MTRC receipts, applied security \n11 \nproceeds, and Annual Termination Fee Remittances. Qualifying Transmission Revenues \n12 \nreduce the Supplemental MTRC shortfall and would not be counted again as a separate \n13 \nCRA formula-rate credit. The Annual Update would credit Supplemental MTRC actually \n14 \nreceived, including applicable Security proceeds received and applied to that obligation and \n15 \namounts LSPGNY recovers directly from the Eligible Customer. Later collections of \n16 \npreviously unpaid amounts would be credited in the year received, even if the earlier \n17 \ncollection shortfall was recovered through the ordinary formula-rate true-up. Each receipt \n18 \nwould be credited only once. Recovery through the RTFC would not discharge the Eligible \n19 \nCustomer’s unpaid CRA obligation, and any subsequent recovery from that customer \n20 \nwould reduce the formula-rate revenue requirement through the receipt-based credit. \n21 \nPosting or holding security does not constitute payment. Amounts applied to an identified \n22 \nobligation would be recognized once in the Cumulative Revenue Ledger, while formula-\n23"},{"page":31,"startToken":7822,"endToken":8109,"text":"28 \nrate credits would be reflected as provided in the template. The workpapers distinguish \n1 \nsatisfaction of the contractual commitment from recognition of amounts in rates. \n2 \nAttachment 1a and the supporting workpapers identify the applicable Annual MTRC, \n3 \nQualifying Transmission Revenues, and Supplemental MTRC by Eligible Customer and \n4 \nCovered Upgrade. Projected Supplemental MTRC and Annual Termination Fee \n5 \nRemittances in the Annual Projection, replaced by actual receipts in the Annual Update, \n6 \nwould flow through the formula rate as Large Load CRA Revenue, a revenue credit on \n7 \nAppendix A, Line 2, that is spread through the base carrying charge rather than applied to \n8 \nindividual Covered Upgrades. The customer-level true-up would be calculated on \n9 \nAttachment 5. Amounts would be traceable to billing and settlement records and applicable \n10 \nFERC Form No. 1 accounts. These records prevent duplicate recognition of CRA amounts \n11 \nand distinguish customer-level true-up adjustments from LSPGNY’s revenue-requirement \n12 \ntrue-up. Segment A’s existing tariff cost allocation would apply to the single RTFC that \n13 \ncombines Segment A and Large Load-Driven Upgrade revenue requirements, net of the \n14 \napplicable general CRA revenue credits. \n15 \nVI. TARIFF AND PROTOCOL REVISIONS \n16 \nQ. \nWHAT CHANGES ARE NEEDED TO PUT THE FRAMEWORK INTO EFFECT? \n17 \nA. \nLSPGNY proposes revisions to Rate Schedule 10 to authorize recovery of eligible Large \n18 \nLoad-Driven Upgrade costs through its company-specific formula rate and establish the \n19 \nassociated CRA framework. The proposed tariff revisions retain the requirement for a \n20 \nsection 205 filing and Commission acceptance adding an upgrade to Table 1 before its \n21 \nrevenue requirement enters the RTFC. They provide that Large Load-Driven Upgrade \n22 \nrevenue requirements are combined with Segment A’s revenue requirement in a single \n23"},{"page":32,"startToken":8109,"endToken":8374,"text":"29 \nRTFC using Segment A’s existing tariff cost allocation. Table 1 identifies eligible upgrades \n1 \nwithout establishing separate zonal or subzonal allocations for them. Supplemental MTRC \n2 \nis billed to the responsible Eligible Customer. The tariff, formula rate template, and \n3 \nprotocols would consistently recognize projected CRA revenue in the Annual Projection \n4 \nand actual cash receipts in the Annual Update, with receipt-related differences reflected \n5 \nthrough the ordinary formula-rate true-up and its applicable interest provisions. The \n6 \nEligible Customer would remain liable for unpaid amounts, and later recoveries would be \n7 \ncredited when received. Section 3.08(a) of LSPGNY’s Operating Agreement reserves a \n8 \nfiling right for recovery of reasonably incurred costs and a reasonable return for services \n9 \nunder the OATT.  \n10 \nQ. \nWHAT DO THE FORMULA RATE IMPLEMENTATION PROTOCOLS \n11 \nPROVIDE? \n12 \nA. \nThe Annual Projection and Annual Update include upgrade-specific workpapers showing \n13 \nthe applicable Annual MTRC, forecast Qualifying Transmission Revenues, projected \n14 \nSupplemental MTRC, the Total Required Revenue Commitment, and Required Operational \n15 \nSecurity. The Annual Update workpapers would reconcile projected CRA revenue credits \n16 \nto actual Supplemental MTRC cash receipts, applicable Security proceeds received and \n17 \napplied to those obligations, and Annual Termination Fee Remittances received. They \n18 \nwould separately identify billed amounts, unpaid balances, later collections of prior-year \n19 \nbills, and refunds of previously credited receipts, and reconcile receipt-based credits to \n20 \nFERC Form No. 1 accounting amounts. Workpapers would be organized by Eligible \n21 \nCustomer, Large Load Facility, and Covered Upgrade. The Reconciliation Statement \n22 \nsupports the separate customer-level adjustment based on actual Qualifying Transmission \n23"},{"page":33,"startToken":8374,"endToken":8611,"text":"30 \nRevenues, without interest and without duplicating that adjustment. Differences between \n1 \nprojected CRA revenue credits and actual receipts would be reconciled through the \n2 \nordinary formula-rate true-up under Protocols Section 2.B, with interest under Section 2.C. \n3 \nWorkpapers identify the relevant template lines, reconcile billed and received amounts, and \n4 \ndistinguish customer-level true-up adjustments from over- or under-recovery of LSPGNY’s \n5 \nrevenue requirement. The Annual Update would be prepared by June 30 following the Rate \n6 \nYear, with the ordinary true-up included in the next Annual Projection prepared after the \n7 \nAnnual Update for the following Rate Year. Projection workpapers would disclose prior-\n8 \nyear unpaid Supplemental MTRC balances separately. Expected collections of those \n9 \nbalances would be excluded from Projected Large Load CRA Revenue and credited as \n10 \nActual Large Load CRA Revenue only in the Rate Year in which received. \n11 \nInterested parties would be able to review the data, calculations, and application of the filed \n12 \nformula rate under the protocols. The protocols add the parties to each CRA to the service \n13 \nlist and require confidential treatment of customer-specific information, with aggregated or \n14 \nredacted public versions. The review would test whether the CRA amounts were correctly \n15 \nreflected in rates. The process would leave the underlying contractual commitment to the \n16 \nCRA and applicable tariff and Commission procedures. \n17 \nQ. \nDOES THIS CONCLUDE YOUR TESTIMONY? \n18 \nA. \nYes. \n19"},{"page":34,"startToken":8611,"endToken":8689,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nLS Power Grid New York Corporation I \nNew York Independent System Operator, Inc. \n) \n) \n) \n) \nDocket No. ER27-___-000 \nDocket No. EL26-69-000 \n \nVERIFICATION \nI, Patrick Hayes, verify under penalty of perjury that I have read the testimony, know the \ncontents thereof, and that the facts and representations set forth therein are true to the best of my \nknowledge, information and belief. \n_/s/ Patrick Hayes________________ \nPatrick Hayes \nDate __November 14, 2026_________"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":0,"startToken":0,"endToken":53},{"p":2,"at":0,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":4,"endAt":38,"startToken":53,"endToken":119},{"p":4,"at":38,"title":"I. INTRODUCTION AND EXPERIENCE","method":"printed heading","endPage":4,"endAt":126,"startToken":119,"endToken":133},{"p":4,"at":126,"title":"A. My name is Patrick Hayes. My business address is 16150 Main Circle Drive, Suite 310,","method":"printed heading","endPage":5,"endAt":511,"startToken":133,"endToken":413},{"p":5,"at":511,"title":"II. PURPOSE AND SCOPE OF TESTIMONY","method":"printed heading","endPage":6,"endAt":664,"startToken":413,"endToken":706},{"p":6,"at":664,"title":"A. Yes. I am sponsoring the following exhibits:","method":"printed heading","endPage":6,"endAt":865,"startToken":706,"endToken":730},{"p":6,"at":865,"title":"III. THE NYISO SHOW CAUSE ORDER","method":"printed heading","endPage":6,"endAt":962,"startToken":730,"endToken":747},{"p":6,"at":962,"title":"A. On June 18, 2026, the Federal Energy Regulatory Commission (“Commission” or “FERC”)","method":"printed heading","endPage":7,"endAt":1310,"startToken":747,"endToken":1070},{"p":7,"at":1310,"title":"A. LSPGNY is a Transmission Owner for purposes of the NYISO tariffs under its Operating","method":"printed heading","endPage":8,"endAt":1498,"startToken":1070,"endToken":1412},{"p":8,"at":1498,"title":"IV. NYISO STAKEHOLDER PROCESS","method":"printed heading","endPage":8,"endAt":1576,"startToken":1412,"endToken":1425},{"p":8,"at":1576,"title":"A. LSPGNY discussed load study procedures with NYISO staff in late 2025 and participated","method":"printed heading","endPage":9,"endAt":1219,"startToken":1425,"endToken":1653},{"p":9,"at":1219,"title":"A. On July 20, 2026, LSPGNY contacted counsel for the New York Transmission Owners","method":"printed heading","endPage":10,"endAt":758,"startToken":1653,"endToken":1859},{"p":10,"at":758,"title":"A. The discussions identified the need for a rate provision that works for non-incumbent","method":"printed heading","endPage":10,"endAt":1556,"startToken":1859,"endToken":1978},{"p":10,"at":1556,"title":"V. COST RECOVERY AGREEMENT","method":"printed heading","endPage":10,"endAt":1652,"startToken":1978,"endToken":1996},{"p":10,"at":1652,"title":"A. LSPGNY proposes a pro forma CRA between LSPGNY and the Eligible Customer taking","method":"printed heading","endPage":11,"endAt":781,"startToken":1996,"endToken":2153},{"p":11,"at":781,"title":"A. The study results would identify the Covered Upgrades and the responsibility to be","method":"printed heading","endPage":12,"endAt":871,"startToken":2153,"endToken":2462},{"p":12,"at":871,"title":"A. The applicable study would identify the upgrades needed to serve the requested load and","method":"printed heading","endPage":15,"endAt":698,"startToken":2462,"endToken":3294},{"p":15,"at":698,"title":"A. The CRA establishes an Annual Minimum Transmission Revenue Contribution (“Annual","method":"printed heading","endPage":17,"endAt":510,"startToken":3294,"endToken":3862},{"p":17,"at":510,"title":"A. The Annual MTRC is a levelized contractual amount calculated using the inputs specified","method":"printed heading","endPage":17,"endAt":1676,"startToken":3862,"endToken":4036},{"p":17,"at":1676,"title":"A. Capital cost alone does not measure the full revenue contribution associated with an","method":"printed heading","endPage":19,"endAt":1643,"startToken":4036,"endToken":4600},{"p":19,"at":1643,"title":"A. No. The Eligible Customer and the transmission customers responsible for the combined","method":"printed heading","endPage":20,"endAt":747,"startToken":4600,"endToken":4751},{"p":20,"at":747,"title":"A. LSPGNY would include the projected Supplemental MTRC, including any prior-period","method":"printed heading","endPage":21,"endAt":1071,"startToken":4751,"endToken":5073},{"p":21,"at":1071,"title":"A. Reflecting projected Supplemental MTRC allows the expected contribution to reduce the","method":"printed heading","endPage":22,"endAt":1198,"startToken":5073,"endToken":5371},{"p":22,"at":1198,"title":"A. Before Rate Year Y, the Annual Projection would include the projected revenue","method":"printed heading","endPage":23,"endAt":875,"startToken":5371,"endToken":5644},{"p":23,"at":875,"title":"A. The customer-level true-up of the difference between the Supplemental MTRC billed for","method":"printed heading","endPage":24,"endAt":66,"startToken":5644,"endToken":5806},{"p":24,"at":66,"title":"A. Exhibit No. GNY-204, Attachment 1a, illustrates an Annual MTRC of $7,320,060 and","method":"printed heading","endPage":24,"endAt":1188,"startToken":5806,"endToken":5983},{"p":24,"at":1188,"title":"A. Each Covered Upgrade would have its own applicable in-service date, Annual MTRC, and","method":"printed heading","endPage":25,"endAt":555,"startToken":5983,"endToken":6161},{"p":25,"at":555,"title":"A. Schedule 5 includes an unpopulated MTRC Calculation Template and the supporting FCR","method":"printed heading","endPage":25,"endAt":1526,"startToken":6161,"endToken":6302},{"p":25,"at":1526,"title":"A. The proposed CRA revenue credits reduce the combined RTFC by $6,195,840 under the","method":"printed heading","endPage":27,"endAt":101,"startToken":6302,"endToken":6673},{"p":27,"at":101,"title":"A. Project 1 assumes $60 million of capital cost, a $7,320,060 Annual MTRC, 8,760 billing","method":"printed heading","endPage":28,"endAt":1134,"startToken":6673,"endToken":7118},{"p":28,"at":1134,"title":"A. Before a Covered Upgrade enters service, construction security would cover the costs and","method":"printed heading","endPage":29,"endAt":928,"startToken":7118,"endToken":7374},{"p":29,"at":928,"title":"A. Under CRA Section 3.3.4, when the applicable termination provisions are triggered, the","method":"printed heading","endPage":30,"endAt":739,"startToken":7374,"endToken":7647},{"p":30,"at":739,"title":"A. LSPGNY would separately track assigned upgrade costs, Qualifying Transmission","method":"printed heading","endPage":31,"endAt":1285,"startToken":7647,"endToken":8011},{"p":31,"at":1285,"title":"VI. TARIFF AND PROTOCOL REVISIONS","method":"printed heading","endPage":31,"endAt":1391,"startToken":8011,"endToken":8029},{"p":31,"at":1391,"title":"A. LSPGNY proposes revisions to Rate Schedule 10 to authorize recovery of eligible Large","method":"printed heading","endPage":32,"endAt":928,"startToken":8029,"endToken":8245},{"p":32,"at":928,"title":"A. The Annual Projection and Annual Update include upgrade-specific workpapers showing","method":"printed heading","endPage":33,"endAt":1571,"startToken":8245,"endToken":8608},{"p":33,"at":1571,"title":"A. Yes.","method":"printed heading","endPage":34,"endAt":552,"startToken":8608,"endToken":8689}]}
