{"document":{"slug":"rec-20261116-5286-5","title":"Arzola Testimony (Exhibit No. GNY-200)","issued":"2026-11-16","accession":"20261116-5286","docket":"ER27-518-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"LS Power Grid New York Corporation INew York Independent System Operator, Inc.","kind":"attachment","file":"sources/filings/text/20261116-5286_008.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5286","tier":"record","parent":"rec-20261116-5286","sha256":"c6f9f7207a8369626e4b3174ce106e23be7bec8a3bc7a961f5e8d3d931ce67ff","pages":21,"tokens":5542,"emptyPages":[],"textThemes":["cost"]},"pages":[{"page":1,"startToken":0,"endToken":193,"text":"Exhibit No. GNY-200 \n \nUNITED STATES OF AMERICA BEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \nLS POWER GRID NEW YORK CORPORATION I \n) \nDocket No. ER27-__-000 \nNEW YORK INDEPENDENT SYSTEM \n \n) \nDocket No. EL26-69-000 \n OPERATOR, INC. \n \n) \n \nDIRECT TESTIMONY \nOF \nD. ERIC ARZOLA \n \n \nI. \nINTRODUCTION AND EXPERIENCE \n1 \nQ. \nPLEASE STATE YOUR NAME AND BUSINESS ADDRESS. \n2 \nA. \nMy name is D. Eric Arzola.  My business address is 16150 Main Circle Drive, Suite 310, \n3 \nChesterfield, Missouri 63017. \n4 \nQ. \nWITH WHAT ENTITY ARE YOU EMPLOYED? \n5 \nA. \nI am employed as the Director of Transmission Rates at LS Power Development, LLC \n6 \n(“LS Power Development”), the general partner and manager of LS Power Associates, \n7 \nL.P. (“LS Power”), which is the indirect majority owner of LS Power Grid New York \n8 \nCorporation I (“LSPGNY” or “Company”). \n9 \nQ. \nON WHOSE BEHALF ARE YOU TESTIFYING IN THIS PROCEEDING? \n10 \nA. \nI am testifying on behalf of LSPGNY. \n11 \nQ. \nHAVE YOU PREVIOUSLY FILED TESTIMONY BEFORE A REGULATORY \n12 \nCOMMISSION? \n13 \nA. \nYes.  I have submitted testimony in FERC Docket Nos. ER22-221, ER23-206, ER24-\n14 \n264, ER24-2668, ER25-321, ER25-2025, ER26-140, ER26-315, ER27-165, and ER27-\n15 \n482. \n16"},{"page":2,"startToken":193,"endToken":500,"text":"Exhibit No. GNY-200 \nPage 2 of 20 \n \nQ. \nPLEASE DESCRIBE YOUR EDUCATIONAL BACKGROUND AND \n1 \nPROFESSIONAL EXPERIENCE. \n2 \nA. \nI have a Bachelor of Arts degree in Economics from Rice University in Houston, Texas, \n3 \nand a Graduate Certificate in Energy Policy and Management from Portland State \n4 \nUniversity in Portland, Oregon.  I have over 22 years of experience in the energy \n5 \nindustry, with over 12 years focused on transmission cost of service rates, regulation, and \n6 \nstrategy.  I have been employed by LS Power Development since 2020, where I am \n7 \nresponsible for overseeing transmission rates for LS Power’s Federal Energy Regulatory \n8 \nCommission (“FERC” or “Commission”) jurisdictional entities.  Prior to joining LS \n9 \nPower, I held positions with similar responsibilities at GridLiance LLC and PacifiCorp. \n10 \nII. \nPURPOSE AND SUMMARY OF TESTIMONY \n11 \nQ. \nWHAT IS THE PURPOSE OF YOUR TESTIMONY? \n12 \nA. \nThe purpose of my testimony is to explain the revisions LSPGNY proposes to its \n13 \nFormula Rate Template and Formula Rate Implementation Protocols so that LSPGNY \n14 \ncan recover the cost of transmission facilities built to serve large loads and covered by a \n15 \nLarge Load Cost Recovery Agreement (“CRA”) (“Covered Upgrades”), and credit the \n16 \namounts Eligible Customers pay under their CRAs toward its transmission revenue \n17 \nrequirement.  The revisions respond to the Commission’s June 18, 2026, order in Docket \n18 \nNo. EL26-69-000 (“Show Cause Order”).  Specifically, my testimony (i) describes the \n19 \nlarge load cost recovery framework the revisions implement; (ii) describes the changes to \n20 \nthe Formula Rate Template, including new Attachments 1a and 2a; (iii) describes several \n21 \nministerial corrections to the existing Formula Rate Template; (iv) describes the changes \n22 \nto the Formula Rate Implementation Protocols; (v) describes the exhibits I sponsor, \n23 \nincluding illustrative examples; and (vi) explains why the revisions are just and \n24"},{"page":3,"startToken":500,"endToken":743,"text":"Exhibit No. GNY-200 \nPage 3 of 20 \n \nreasonable.  The pro forma CRA, including how each Eligible Customer’s annual \n1 \nMinimum Transmission Revenue Contribution is established, is sponsored by LSPGNY \n2 \nwitness Mr. Hayes. \n3 \nQ. \nPLEASE SUMMARIZE THE PROPOSED REVISIONS TO THE FORMULA \n4 \nRATE TEMPLATE. \n5 \nA. \nLSPGNY proposes the following changes: \n6 \n• Add Attachment 2a – Project Plant Detail, to report plant and net investment \n7 \nseparately for the Marcy to New Scotland 345 kV Upgrade Project (“Segment A”) \n8 \nand each Covered Upgrade; \n9 \n• Use the project detail on Attachment 2a to calculate the revenue requirement of \n10 \neach project on Attachment 4 – Incentives; \n11 \n• Add Attachment 1a – Supplemental MTRC, to calculate, by Eligible Customer \n12 \nand Covered Upgrade, the Supplemental MTRC and Annual Termination Fee \n13 \nRemittances that make up Projected Large Load CRA Revenue, and to record the \n14 \nActual Large Load CRA Revenue LSPGNY receives; \n15 \n• Credit Projected Large Load CRA Revenue in the Annual Projection, and Actual \n16 \nLarge Load CRA Revenue in the Annual Update, on a new Line 5a of Attachment \n17 \n1 – Revenue Credits; \n18 \n• Add lines to Appendix A that show the Large Load CRA Revenue the New York \n19 \nIndependent System Operator, Inc. (“NYISO”) will bill and remit to LSPGNY; \n20 \n• Add a true-up of the Supplemental MTRC by Eligible Customer and Covered \n21 \nUpgrade on Attachment 5 – True-Up; and \n22 \n• Correct several ministerial errors in the existing Formula Rate Template. \n23"},{"page":4,"startToken":743,"endToken":985,"text":"Exhibit No. GNY-200 \nPage 4 of 20 \n \nLSPGNY also proposes limited changes to the Formula Rate Implementation Protocols to \n1 \ndefine the new terms, add work paper and notice requirements, address how Large Load \n2 \nCRA Revenue is reflected in the True-Up Adjustment, and address customer-specific \n3 \ninformation. \n4 \nQ. \nDO THE REVISIONS CHANGE HOW LSPGNY’S REVENUE REQUIREMENT \n5 \nIS CALCULATED? \n6 \nA. \nNo.  The cost of service inputs, return, depreciation, taxes, and allocators are unchanged.  \n7 \nCovered Upgrades are included in LSPGNY’s rate base and revenue requirement in the \n8 \nsame manner as any other LSPGNY transmission plant.  The revisions add project-level \n9 \ndetail and a new revenue credit for Large Load CRA Revenue.  Absent any Covered \n10 \nUpgrade or CRA, the revised Formula Rate Template produces the same revenue \n11 \nrequirement as the currently effective Formula Rate Template, apart from the ministerial \n12 \ncorrections described below. \n13 \nQ. \nOTHER THAN YOUR TESTIMONY, ARE YOU SPONSORING ANY \n14 \nEXHIBITS? \n15 \nA. \nYes.  I am sponsoring the following exhibits: \n16 \n• Exhibit No. GNY-201, Clean Formula Rate Template; \n17 \n• Exhibit No. GNY-202, Marked Formula Rate Template; \n18 \n• Exhibit No. GNY-203, Clean Formula Rate Template in native Excel format with \n19 \nall formulas intact; \n20 \n• Exhibit No. GNY-204, Illustrative Formula Rate Template – Annual Projection; \n21 \n• Exhibit No. GNY-205, Illustrative Formula Rate Template – Annual Update; \n22 \n• Exhibit No. GNY-206, Clean Formula Rate Implementation Protocols; and \n23 \n• Exhibit No. GNY-207, Marked Formula Rate Implementation Protocols. \n24"},{"page":5,"startToken":985,"endToken":1304,"text":"Exhibit No. GNY-200 \nPage 5 of 20 \n \nIII. \nLSPGNY AND FORMULA RATE BACKGROUND \n1 \nQ. \nPLEASE PROVIDE AN OVERVIEW OF LSPGNY AND ITS FORMULA RATE. \n2 \nA. \nLSPGNY is a transmission-only company that owns Segment A, developed with the New \n3 \nYork Power Authority to meet the AC Transmission Public Policy Transmission Need.  \n4 \nLSPGNY’s formula rate consists of its Formula Rate Template (NYISO Open Access \n5 \nTransmission Tariff (“OATT”) Section 6.10.7.2.1) and its Formula Rate Implementation \n6 \nProtocols (Section 6.10.7.2.2) (together, the “Formula Rate”), which were accepted by \n7 \nthe Commission in Docket No. ER20-716.  LSPGNY’s revenue requirement is recovered \n8 \nunder Rate Schedule 10 of the NYISO OATT. \n9 \nQ. \nHOW DOES THE FORMULA RATE OPERATE EACH YEAR? \n10 \nA. \nBy September 30, LSPGNY posts an Annual Projection of its revenue requirement for \n11 \nthe upcoming Rate Year.  By June 30 after each Rate Year, LSPGNY posts an Annual \n12 \nUpdate using actual FERC Form No. 1 or other Company data.  The difference between \n13 \nthe revenue LSPGNY collected during the Rate Year and its actual revenue requirement, \n14 \nwith interest, is the True-up Adjustment, which is included in a later Annual Projection. \n15 \nQ. \nWHY MUST LSPGNY REVISE ITS FORMULA RATE? \n16 \nA. \nIn the Show Cause Order, the Commission directed the NYISO and its transmission \n17 \nowners to show cause why their tariffs remain just and reasonable or to propose changes \n18 \nfor integrating large loads.  Among other things, the Commission called for a mechanism \n19 \nto ensure that large load payments are “credited toward transmission owners’ \n20 \ntransmission revenue requirements.”  LSPGNY’s current Formula Rate Template reports \n21 \nplant values only in total and has no means of identifying the facilities built to serve large \n22 \nloads or of crediting the amounts Eligible Customers pay under their CRAs.  The \n23 \nrevisions I describe provide that mechanism. \n24"},{"page":6,"startToken":1304,"endToken":1602,"text":"Exhibit No. GNY-200 \nPage 6 of 20 \n \nIV. \nTHE LARGE LOAD COST RECOVERY FRAMEWORK \n1 \nQ. \nWHAT IS A CRA? \n2 \nA. \nA CRA is an agreement between LSPGNY and an Eligible Customer taking transmission \n3 \nservice on behalf of a large load.  Under its CRA, the Eligible Customer commits to an \n4 \nannual Minimum Transmission Revenue Contribution (“Annual MTRC”) for each \n5 \nCovered Upgrade built to serve the large load, for the term of the CRA.  The Annual \n6 \nMTRC is calculated solely under the CRA.  The terms of the pro forma CRA, including \n7 \nhow the Annual MTRC is established, termination, and credit support requirements, are \n8 \ndescribed in the transmittal letter and the testimony of Mr. Hayes.  The Formula Rate \n9 \nTemplate uses the Annual MTRC set by each CRA as an input. \n10 \nQ. \nHOW ARE THE COSTS OF COVERED UPGRADES RECOVERED? \n11 \nA. \nThe cost of each Covered Upgrade is included in LSPGNY’s rate base and revenue \n12 \nrequirement and recovered under the NYISO OATT together with the cost of Segment A.  \n13 \nEach Eligible Customer pays transmission charges for the service it takes, like any other \n14 \ntransmission customer.  The transmission revenues that count toward an Eligible \n15 \nCustomer’s Annual MTRC, as determined under its CRA, are its “Qualifying \n16 \nTransmission Revenues.” \n17 \nQ. \nWHAT IS THE SUPPLEMENTAL MTRC? \n18 \nA. \nThe Supplemental MTRC is the amount, if any, by which an Eligible Customer’s Annual \n19 \nMTRC for a Covered Upgrade exceeds its Qualifying Transmission Revenues for that \n20 \nCovered Upgrade.  It requires the Eligible Customer to pay at least its committed Annual \n21 \nMTRC each year, even if its load develops more slowly than expected.  The \n22 \nSupplemental MTRC is measured separately for each Covered Upgrade and is never less \n23"},{"page":7,"startToken":1602,"endToken":1903,"text":"Exhibit No. GNY-200 \nPage 7 of 20 \n \nthan zero, so Qualifying Transmission Revenues above the Annual MTRC on one \n1 \nCovered Upgrade do not offset a shortfall on another. \n2 \nQ. \nHOW IS THE SUPPLEMENTAL MTRC BILLED? \n3 \nA. \nThe Supplemental MTRC follows the same projection and true-up cycle as the rest of the \n4 \nFormula Rate.  In each Annual Projection, LSPGNY projects each Eligible Customer’s \n5 \nQualifying Transmission Revenues and resulting Supplemental MTRC for the Rate Year.  \n6 \nThe NYISO bills each active Eligible Customer its projected Supplemental MTRC in \n7 \nequal monthly installments during the Rate Year and remits the amounts to LSPGNY.  In \n8 \nthe Annual Update, the Supplemental MTRC billed is compared to the Supplemental \n9 \nMTRC based on actual Qualifying Transmission Revenues.  The difference is included, \n10 \nwithout interest, in that Eligible Customer’s Supplemental MTRC in a later Annual \n11 \nProjection. \n12 \nQ. \nWHY IS THE SUPPLEMENTAL MTRC PROJECTED AND TRUED UP \n13 \nRATHER THAN BILLED AFTER THE RATE YEAR? \n14 \nA. \nBilling the projected amount during the Rate Year matches the timing of the \n15 \nSupplemental MTRC credit to the Rate Year in which it reduces the revenue requirement, \n16 \nspreads the Eligible Customer’s payments evenly over the year, and uses the projection \n17 \nand true-up process that stakeholders already know.  Because each Eligible Customer’s \n18 \nSupplemental MTRC is trued up to actual Qualifying Transmission Revenues, the \n19 \nEligible Customer is ultimately responsible for its full Annual MTRC.  Any difference \n20 \nbetween the projected and actual amounts is corrected in a later Rate Year. \n21 \nQ. \nWHAT HAPPENS IF AN ELIGIBLE CUSTOMER TERMINATES ITS CRA? \n22 \nA. \nIf an Eligible Customer terminates its CRA after an applicable in-service date, it pays a \n23 \nTermination Fee equal to its Remaining Cumulative Revenue Responsibility less any \n24"},{"page":8,"startToken":1903,"endToken":2225,"text":"Exhibit No. GNY-200 \nPage 8 of 20 \n \nSupplemental MTRC already billed and remaining unpaid as of the effective termination \n1 \ndate, as provided in CRA Section 3.3.4. The NYISO collects and holds that fee. The \n2 \nexcluded unpaid bills remain separately payable as Large Load Charges, and receipt of \n3 \nthe Termination Fee in full discharges only the remaining responsibility included in the \n4 \nfee, not those unpaid bills.  The NYISO remits to LSPGNY the scheduled Annual \n5 \nTermination Fee Remittances determined under CRA Section 3.3.6 and the Termination \n6 \nFee Remittance Worksheet in Schedule 5. Those scheduled amounts reflect applicable \n7 \npartial-year proration, are limited to the available Termination Fee Balance, and include \n8 \nany residual balance and actual account earnings required to be remitted with the final \n9 \ninstallment.  LSPGNY credits the Annual Termination Fee Remittances in the same way \n10 \nas the Supplemental MTRC, with projected remittances credited in the Annual Projection \n11 \nand actual remittances received credited in the Annual Update.  The Covered Upgrade \n12 \nremains in rate base.  The terms governing termination are described in the testimony of \n13 \nMr. Hayes. \n14 \nQ. \nHOW DOES THE FORMULA RATE TREAT LARGE LOAD CRA REVENUE? \n15 \nA. \nThe Supplemental MTRC and Annual Termination Fee Remittances (together, “Large \n16 \nLoad CRA Revenue”) are credited against LSPGNY’s revenue requirement as a revenue \n17 \ncredit.  The credit reduces the revenue requirement dollar for dollar, so the benefit goes to \n18 \ncustomers rather than to LSPGNY.  In the Annual Projection, LSPGNY credits the Large \n19 \nLoad CRA Revenue it projects for the Rate Year (“Projected Large Load CRA \n20 \nRevenue”).  In the Annual Update, it credits the Large Load CRA Revenue it receives \n21 \nduring the Rate Year (“Actual Large Load CRA Revenue”): Supplemental MTRC \n22 \npayments the NYISO collects and remits, Applied Security Proceeds applied to \n23 \nSupplemental MTRC obligations and remitted by the NYISO, amounts LSPGNY \n24"},{"page":9,"startToken":2225,"endToken":2505,"text":"Exhibit No. GNY-200 \nPage 9 of 20 \n \nrecovers directly from an Eligible Customer and applies to Supplemental MTRC \n1 \nobligations, and Annual Termination Fee Remittances. \n2 \nQ. \nDO THE COVERED UPGRADES RECEIVE THE INCENTIVES GRANTED \n3 \nFOR SEGMENT A? \n4 \nA. \nNo.  The return on equity (“ROE”) incentive the Commission granted for Segment A in \n5 \nDocket No. ER20-716 applies only to Segment A, as entered on Attachment 4, \n6 \nColumn (e) and documented under Note D.  Covered Upgrades are separately identified \n7 \nin LS Power Grid’s Formula Rate and use the capital structure and generally applicable \n8 \nreturn components applicable to LS Power Grid under Rate Schedule 10, including any \n9 \nCommission-approved generally applicable return on equity incentive, as applicable. \n10 \nCovered Upgrades do not receive return on equity incentives that are specific to the AC \n11 \nTransmission Project or become subject to the AC Transmission Project’s Competitive \n12 \nBid Concession, cost cap, or other project-specific cost-containment commitments. \n13 \nV. \nLSPGNY’S PROPOSED FORMULA RATE TEMPLATE CHANGES \n14 \nQ. \nWHY IS ATTACHMENT 2A NEEDED? \n15 \nA. \nThe existing Formula Rate Template reports transmission plant only in total.  To identify \n16 \nthe investment in each Covered Upgrade, the Formula Rate Template must report \n17 \nSegment A and each Covered Upgrade separately.  Attachment 2a provides that detail. \n18 \nQ. \nPLEASE DESCRIBE ATTACHMENT 2A. \n19 \nA. \nAttachment 2a has five sections, each with a line for Segment A and lines for Covered \n20 \nUpgrades.  Additional project lines may be added as Covered Upgrades are placed in \n21 \nservice. \n22 \n• Section 1 reports monthly transmission gross plant in service and its 13-month \n23 \naverage.  The monthly totals populate Attachment 2, Lines 2–14. \n24"},{"page":10,"startToken":2505,"endToken":2819,"text":"Exhibit No. GNY-200 \nPage 10 of 20 \n \n• Section 2 reports monthly transmission accumulated depreciation and its 13-\n1 \nmonth average.  The monthly totals populate Attachment 2, Lines 78–90. \n2 \n• Sections 3 and 4 report unamortized regulatory assets and unamortized abandoned \n3 \nplant by project. \n4 \n• Section 5 calculates each project’s net investment (Line 1 – Line 2 + Line 3 + \n5 \nLine 4), which is used on Attachment 4, Column (b).  The total ties to Appendix \n6 \nA, Line 103. \n7 \nBecause the Attachment 2a totals flow to Attachment 2, total plant and accumulated \n8 \ndepreciation are unchanged.  Project names entered on Attachment 2a carry to \n9 \nAttachment 4, Column (a), and Attachment 5, Lines 2–2d. \n10 \nQ. \nPLEASE DESCRIBE THE REVISIONS TO ATTACHMENT 1. \n11 \nA. \nLSPGNY proposes a new Line 5a, Large Load CRA Revenue – Supplemental MTRC \n12 \nand Annual Termination Fee Remittances, which will be included in Total Revenue \n13 \nCredits on Line 6.  New Note 4 describes the new line.  In an Annual Projection, Line 5a \n14 \nequals the Projected Large Load CRA Revenue, the Attachment 1a total.  In an Annual \n15 \nUpdate, Line 5a equals the Actual Large Load CRA Revenue received during the Rate \n16 \nYear, from new Lines 24–34 of Attachment 1a.  Line 2 of the account detail on \n17 \nAttachment 1 shows the Large Load CRA Revenue recorded in Account 456, and any \n18 \ndifference from Line 5a is reconciled in the work papers required by the Formula Rate \n19 \nImplementation Protocols.  Qualifying Transmission Revenues are not credited on Line \n20 \n5a because they are already part of the transmission revenue LSPGNY collects. \n21 \nQ. \nWHY IS LARGE LOAD CRA REVENUE TREATED AS A REVENUE CREDIT? \n22 \nA. \nRevenue credits are the Formula Rate Template’s existing means of passing revenue back \n23 \nto customers.  Crediting Large Load CRA Revenue on Attachment 1 reduces LSPGNY’s \n24"},{"page":11,"startToken":2819,"endToken":3102,"text":"Exhibit No. GNY-200 \nPage 11 of 20 \n \nrevenue requirement on Appendix A, Line 2 and, through Line 106, the base carrying \n1 \ncharge used to calculate each project’s revenue requirement on Attachment 4.  No new \n2 \nallocation method is needed. \n3 \nQ. \nPLEASE DESCRIBE THE NEW ATTACHMENT 1A. \n4 \nA. \nAttachment 1a calculates Projected Large Load CRA Revenue, and records Actual Large \n5 \nLoad CRA Revenue, by Eligible Customer and Covered Upgrade for the Rate Year.  \n6 \nEach of Lines 1–10 is one Eligible Customer and Covered Upgrade: \n7 \n• Columns 1–3 identify the Eligible Customer, the Covered Upgrade, and its status \n8 \n(Active or Terminated); \n9 \n• Column 4 is the projected Qualifying Transmission Revenues, from the \n10 \nworkpaper on Lines 14–23, which calculates them as forecast load (MW) \n11 \nmultiplied by billing hours and the applicable transmission rate; \n12 \n• Column 5 is the Annual MTRC under the Eligible Customer’s CRA; \n13 \n• Column 6 is, for an active Eligible Customer, the Supplemental MTRC (Column \n14 \n5 less Column 4, but not less than zero) and, for a terminated Eligible Customer, \n15 \nthe scheduled Annual Termination Fee Remittance for the Rate Year, entered \n16 \nseparately in Column K from the Termination Fee Remittance Worksheet in \n17 \nSchedule 5 of the applicable CRA; \n18 \n• Column 7 is any prior-period true-up adjustment from Attachment 5; and \n19 \n• Column 8 is the total (Column 6 plus Column 7). \n20 \nLine 11 totals each column, and Lines 12 and 13 separate the totals for active and \n21 \nterminated Eligible Customers.  In an Annual Projection, the Line 11 total is credited on \n22 \nAttachment 1, Line 5a.  In an Annual Update, Attachment 1a uses actual Qualifying \n23"},{"page":12,"startToken":3102,"endToken":3424,"text":"Exhibit No. GNY-200 \nPage 12 of 20 \n \nTransmission Revenues to determine the actual Supplemental MTRC for the true-up on \n1 \nAttachment 5, and its labels change from “Projected” to “Actual.” \n2 \nQ. \nWHAT DO NEW LINES 24–34 OF ATTACHMENT 1A SHOW? \n3 \nA. \nLines 24–34 are completed in the Annual Update.  For each Eligible Customer and \n4 \nCovered Upgrade, they show the opening unpaid Supplemental MTRC, the Supplemental \n5 \nMTRC billed during the Rate Year, and the amounts LSPGNY received during the Rate \n6 \nYear: Supplemental MTRC payments the NYISO collected and remitted (Column (c)), \n7 \nApplied Security Proceeds applied to Supplemental MTRC obligations and remitted by \n8 \nthe NYISO (Column (d)), amounts LSPGNY recovered directly from the Eligible \n9 \nCustomer and applied to Supplemental MTRC obligations (Column (e)), and Annual \n10 \nTermination Fee Remittances (Column (f)).  Column (g), the sum of Columns (c) through \n11 \n(f), is the Actual Large Load CRA Revenue, and its total on Line 34 is credited on \n12 \nAttachment 1, Line 5a.  Column (h) is the closing unpaid Supplemental MTRC, which \n13 \ncarries forward to the next Annual Update so that a later collection is identified and \n14 \ncredited once, in the Rate Year in which it is received. \n15 \nQ. \nWHAT IS SHOWN IN THE NEW LINES ON APPENDIX A? \n16 \nA. \nNew lines a1 through c on Appendix A show the Large Load CRA Revenue the NYISO \n17 \nwill bill and remit during the Rate Year: the projected Supplemental MTRC (line a1), \n18 \nprior-period true-up adjustments (line a2), the total Supplemental MTRC to be billed \n19 \n(line a), Annual Termination Fee Remittances (line b), and total Large Load CRA \n20 \nRevenue (line c), which is included in Line 2.  New Note R describes these lines.  These \n21 \ninformational lines are populated for the Annual Projection.  They do not change the \n22 \ncalculation of the Net Adjusted Revenue Requirement on Line 5. \n23"},{"page":13,"startToken":3424,"endToken":3733,"text":"Exhibit No. GNY-200 \nPage 13 of 20 \n \nQ. \nPLEASE DESCRIBE THE REVISIONS TO ATTACHMENT 5. \n1 \nA. \nLSPGNY proposes a new section, Lines 14–24, that trues up the Supplemental MTRC \n2 \nfor each active Eligible Customer and Covered Upgrade.  It compares the Supplemental \n3 \nMTRC billed during the Rate Year to the Supplemental MTRC based on actual \n4 \nQualifying Transmission Revenues.  The difference, without interest, flows to \n5 \nAttachment 1a, Column 7, for that Eligible Customer and Covered Upgrade.  In addition, \n6 \nproject names on Lines 2–2d now come from Attachment 2a, the interest calculation on \n7 \nLines 2a–2d now uses the same formula as Line 2 (previously it was zero), the notes are \n8 \nmoved below the calculations, Note 2 clarifies that revenue received excludes Large \n9 \nLoad CRA Revenue, and new Note 5 describes the Supplemental MTRC true-up. \n10 \nQ. \nWHY IS THE SUPPLEMENTAL MTRC TRUED UP BY ELIGIBLE \n11 \nCUSTOMER? \n12 \nA. \nThe difference between projected and actual Qualifying Transmission Revenues relates to \n13 \na specific Eligible Customer’s commitment.  Truing it up in that Eligible Customer’s \n14 \nSupplemental MTRC keeps responsibility for the Annual MTRC with that Eligible \n15 \nCustomer, rather than with other customers.  True-up adjustments for terminated Eligible \n16 \nCustomers are addressed under the CRA. \n17 \nQ. \nHOW DOES THIS TRUE-UP DIFFER FROM THE TRUE-UP OF LARGE LOAD \n18 \nCRA REVENUE IN THE FORMULA RATE? \n19 \nA. \nThey address different things.  The true-up by Eligible Customer on Attachment 5 \n20 \ncorrects the forecast of Qualifying Transmission Revenues.  It compares the \n21 \nSupplemental MTRC billed with the Supplemental MTRC based on actual Qualifying \n22 \nTransmission Revenues, and the difference, without interest, adjusts that Eligible \n23 \nCustomer’s Supplemental MTRC in a later Annual Projection.  It does not depend on \n24 \nwhether the billed amount was paid.  Separately, the Formula Rate’s existing True-Up \n25"},{"page":14,"startToken":3733,"endToken":3999,"text":"Exhibit No. GNY-200 \nPage 14 of 20 \n \nAdjustment compares the Projected Large Load CRA Revenue credited in the Annual \n1 \nProjection with the Actual Large Load CRA Revenue received.  If a billed amount is not \n2 \nreceived during the Rate Year, LSPGNY’s actual revenue requirement is higher than \n3 \nprojected, and the difference is included, with interest, in the True-Up Adjustment in a \n4 \nlater Annual Projection, in the same manner as any other difference between projected \n5 \nand actual revenue requirement.  The Eligible Customer remains liable for the unpaid \n6 \namount, which is subject to the CRA’s security and collection provisions, and any later \n7 \nreceipt is credited in the Rate Year in which it is received.  Exhibit No. GNY-205 \n8 \nillustrates both true-ups. \n9 \nQ. \nHOW IS CUSTOMER-SPECIFIC INFORMATION ADDRESSED? \n10 \nA. \nAttachment 1a reports information by Eligible Customer and Covered Upgrade.  Under \n11 \nnew Section 8 of the Formula Rate Implementation Protocols, which I describe below, \n12 \ncustomer-specific information is treated as confidential, LSPGNY posts and files \n13 \nversions of its Annual Projection and Annual Update that aggregate or redact that \n14 \ninformation, and the unredacted information is available under the Formula Rate \n15 \nImplementation Protocols’ existing confidentiality procedures. \n16 \nQ. \nARE THERE OTHER CHANGES TO THE FORMULA RATE TEMPLATE? \n17 \nA. \nYes.  Attachments 1a and 2a are added to the Index.  In addition, LSPGNY proposes the \n18 \nministerial corrections described in the next section. \n19 \nVI. \nMINISTERIAL CORRECTIONS \n20 \nQ. \nPLEASE DESCRIBE THE MINISTERIAL CORRECTIONS LSPGNY \n21 \nPROPOSES. \n22 \nA. \nLSPGNY proposes the following corrections to the existing Formula Rate Template: \n23"},{"page":15,"startToken":3999,"endToken":4252,"text":"Exhibit No. GNY-200 \nPage 15 of 20 \n \n• Attachment 4, Column (d): the heading now references Appendix A, Line 98, the \n1 \nline its formula uses, rather than Line 94;  \n2 \n• Attachment 4, Column (n):  the heading now reads (Col. (l) x Col. (m)) rather \n3 \nthan (Col. (l) x Col. (n)); and \n4 \n• Attachment 5, Notes 3 and 4: typographical errors are corrected. \n5 \nQ. \nDO THESE CORRECTIONS CHANGE THE FORMULA RATE \n6 \nMETHODOLOGY? \n7 \nA. \nNo.  Each correction conforms a formula or label to the methodology the Commission \n8 \naccepted in Docket No. ER20-716. \n9 \nVII. \nFORMULA RATE IMPLEMENTATION PROTOCOLS \n10 \nQ. \nWHAT CHANGES DOES LSPGNY PROPOSE TO THE FORMULA RATE \n11 \nIMPLEMENTATION PROTOCOLS? \n12 \nA. \nLSPGNY proposes the following changes: \n13 \n• A new paragraph following the introductory paragraph defines “Cost Recovery \n14 \nAgreement” (“CRA”), “Eligible Customer,” “Annual MTRC,” “Qualifying \n15 \nTransmission Revenues,” “Supplemental MTRC,” “Large Load CRA Revenue,” \n16 \n“Projected Large Load CRA Revenue,” and “Actual Large Load CRA Revenue” \n17 \nas used in the Formula Rate Implementation Protocols and the Formula Rate \n18 \nTemplate.  These definitions are tied to the CRA, and other capitalized terms used \n19 \nin connection with a CRA have the meanings given in the CRA; \n20 \n• Section 1.B adds each Eligible Customer, Large Load Customer, and Successor \n21 \nEligible Customer under a CRA to the Service List; \n22 \n• New Sections 1.E.6 and 3.C.11 require work papers, organized by Eligible \n23 \nCustomer, Large Load Facility, and Covered Upgrade, supporting the Projected \n24"},{"page":16,"startToken":4252,"endToken":4534,"text":"Exhibit No. GNY-200 \nPage 16 of 20 \n \nLarge Load CRA Revenue in the Annual Projection and the Actual Large Load \n1 \nCRA Revenue in the Annual Update, including a reconciliation of the amounts \n2 \nbilled, received, and unpaid.  These work papers are provided with the Formula \n3 \nRate Template and are not part of it; \n4 \n• A new paragraph in Section 2.B provides that, in determining the True-Up \n5 \nAdjustment, the actual Net Revenue Requirement reflects the Actual Large Load \n6 \nCRA Revenue in place of the Projected Large Load CRA Revenue, with the \n7 \ndifference reconciled with interest under Section 2.C; that a billed amount not \n8 \nreceived is not credited, remains owed by the Eligible Customer, and is credited \n9 \nwhen later received; and that this True-Up Adjustment is separate from the true-\n10 \nup of an Eligible Customer’s Supplemental MTRC, which is without interest; \n11 \n• New Section 8, Customer-Specific Information, provides that information specific \n12 \nto an individual Eligible Customer, Large Load Customer, or CRA is treated as \n13 \nconfidential, that LSPGNY will post and file versions of the Annual Projection, \n14 \nAnnual Update, and work papers that aggregate or redact that information, and \n15 \nthat the unredacted information is available to interested parties under a \n16 \nconfidentiality agreement, as provided in Section 4.D, and to the Commission; \n17 \nand \n18 \n• Clean-up changes to capitalization, punctuation, and cross-references, including \n19 \ncorrecting the cross-reference in Section 3.C.10.d. \n20 \nQ. \nWHY ARE THE PROTOCOL CHANGES LIMITED? \n21 \nA. \nThe existing posting, review, challenge, and true-up procedures apply to the Large Load \n22 \nCRA Revenue calculations, and the calculations themselves are in the Formula Rate \n23"},{"page":17,"startToken":4534,"endToken":4823,"text":"Exhibit No. GNY-200 \nPage 17 of 20 \n \nTemplate.  The terms of service, billing, and termination are addressed in the NYISO \n1 \nOATT and the CRA.  The Formula Rate Implementation Protocols therefore need only \n2 \ndefine the new terms, specify how Large Load CRA Revenue is reflected in the True-Up \n3 \nAdjustment, ensure Eligible Customers receive notice and supporting work papers, and \n4 \naddress customer-specific information. \n5 \nVIII. NATIVE AND ILLUSTRATIVE FORMULA RATE TEMPLATES \n6 \nQ. \nPLEASE DESCRIBE EXHIBIT NO. GNY-203. \n7 \nA. \nExhibit No. GNY-203 is the revised Formula Rate Template in native Excel format with \n8 \nall formulas and links intact, including new Attachments 1a and 2a.  It is not populated \n9 \nwith LSPGNY or customer data.  Reviewers can enter values in the input cells and \n10 \nobserve how the formulas respond. \n11 \nQ. \nPLEASE DESCRIBE EXHIBIT NO. GNY-204. \n12 \nA. \nExhibit No. GNY-204 is the revised Formula Rate Template populated with hypothetical \n13 \ndata to illustrate the treatment of Covered Upgrades and Eligible Customers.  The data \n14 \nsimulate an Annual Projection for the 2030 Rate Year with Segment A and four Covered \n15 \nUpgrades serving three Eligible Customers, using a qualifying transmission rate of \n16 \n$1.75/MWh: \n17 \n• Customer A takes service from two Covered Upgrades.  On Large Load Project 1, \n18 \nits 400 MW of forecast load produces projected Qualifying Transmission \n19 \nRevenues of $6,132,000, below its Annual MTRC of $7,320,060, for a \n20 \nSupplemental MTRC of $1,188,060.  These inputs match the illustrative CRA \n21 \nworksheet sponsored by Mr. Hayes.  On Large Load Project 2, its projected \n22 \nQualifying Transmission Revenues exceed its Annual MTRC, so the \n23 \nSupplemental MTRC is zero and does not offset Project 1; \n24"},{"page":18,"startToken":4823,"endToken":5099,"text":"Exhibit No. GNY-200 \nPage 18 of 20 \n \n• Customer B takes service from Large Load Project 3, with projected Qualifying \n1 \nTransmission Revenues below its Annual MTRC; and \n2 \n• Customer C has terminated its CRA for Large Load Project 4, so the NYISO \n3 \nremits an Annual Termination Fee Remittance equal to its Annual MTRC. \n4 \nThe example also includes prior-period true-up adjustments from a 2028 Annual Update \n5 \non Attachment 5, including both under-billed and over-billed Covered Upgrades, and a \n6 \nTrue-up Adjustment for the project revenue requirements on Appendix A, Line 4.  In the \n7 \nexample, the projected Supplemental MTRC is $2.54 million, prior-period true-up \n8 \nadjustments add $0.08 million, and Annual Termination Fee Remittances are $3.57 \n9 \nmillion, for total Large Load CRA Revenue of $6.19 million credited on Appendix A, \n10 \nLine 2.  The illustrative data are hypothetical and are not LSPGNY or customer data. \n11 \nQ. \nPLEASE DESCRIBE EXHIBIT NO. GNY-205. \n12 \nA. \nExhibit No. GNY-205 is the revised Formula Rate Template populated with hypothetical \n13 \ndata to illustrate the Annual Update for the same 2030 Rate Year.  To isolate the \n14 \ntreatment of Large Load CRA Revenue, the cost of service inputs are the same as in \n15 \nExhibit No. GNY-204, and: \n16 \n• Customer A’s actual load on Large Load Project 1 is 380 MW rather than the \n17 \nforecast 400 MW, producing an actual Supplemental MTRC of $1,494,660.  \n18 \nAttachment 5, Lines 14–23, compare that amount with the $1,188,060 billed, \n19 \nbefore prior-period adjustments, and produce a customer-level true-up of \n20 \n$306,600, without interest, for a later Annual Projection; \n21"},{"page":19,"startToken":5099,"endToken":5420,"text":"Exhibit No. GNY-200 \nPage 19 of 20 \n \n• Customer A pays the Supplemental MTRC billed for Large Load Projects 1 and 2 \n1 \nin full, and the NYISO remits Customer C’s Annual Termination Fee Remittance \n2 \nof $3,573,810; and \n3 \n• Customer B is billed $973,050 but pays $648,700.  The NYISO applies $162,175 \n4 \nof Customer B’s Security, leaving $162,175 unpaid at year end.  LSPGNY also \n5 \nrecovers directly from Customer B $50,000 that was unpaid from a prior Rate \n6 \nYear. \n7 \nActual Large Load CRA Revenue on Attachment 1a, Line 34 is $6,083,665, or $112,175 \n8 \nless than the $6,195,840 projected in Exhibit No. GNY-204: the $162,175 not received, \n9 \nless the $50,000 received for a prior Rate Year.  Attachment 5 shows the resulting \n10 \n$112,175 under-recovery, plus $17,948 of interest, as the True-Up Adjustment that would \n11 \nbe included in a later Annual Projection.  Customer B remains liable for its $162,175 \n12 \nclosing unpaid balance, which would be credited in the Rate Year in which it is received.  \n13 \nThe illustrative data are hypothetical and are not LSPGNY or customer data. \n14 \nIX. \nCONCLUSION \n15 \nQ. \nWHY ARE THE PROPOSED REVISIONS JUST AND REASONABLE? \n16 \nA. \nThe revisions implement the Commission’s direction that large load payments be credited \n17 \ntoward transmission owners’ revenue requirements, using the Formula Rate’s existing \n18 \nrevenue credit and true-up mechanisms.  Each Eligible Customer is responsible for at \n19 \nleast its committed Annual MTRC for each Covered Upgrade, supported by Security and \n20 \nthe NYISO’s billing and collection, and the Large Load CRA Revenue LSPGNY \n21 \nreceives reduces the revenue requirement paid by all customers.  LSPGNY retains none \n22 \nof the Large Load CRA Revenue.  The cost of service inputs and methods are unchanged, \n23 \nthe Covered Upgrades do not receive Segment A-specific ROE incentives, and every new \n24"},{"page":20,"startToken":5420,"endToken":5461,"text":"Exhibit No. GNY-200 \nPage 20 of 20 \n \ncalculation ties back to Appendix A.  The existing posting, review, and challenge \n1 \nprocedures apply to the new calculations, with customer-specific information protected. \n2 \nQ. \nDOES THIS CONCLUDE YOUR TESTIMONY? \n3 \nA. \nYes. \n4"},{"page":21,"startToken":5461,"endToken":5542,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nLS Power Grid New York Corporation I \nNew York Independent System Operator, Inc. \n) \n) \n) \n) \nDocket No. ER27-___-000 \nDocket No. EL26-69-000 \n \nVERIFICATION \nI, D. Eric Arzola, verify under penalty of perjury that I have read the testimony, know the \ncontents thereof, and that the facts and representations set forth therein are true to the best of my \nknowledge, information and belief. \n_/s/ D. Eric Arzola________________ \nD. Eric Arzola \nDate __November 14, 2026_________"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":273,"startToken":0,"endToken":36},{"p":1,"at":273,"title":"D. ERIC ARZOLA","method":"printed heading","endPage":1,"endAt":293,"startToken":36,"endToken":39},{"p":1,"at":293,"title":"I. INTRODUCTION AND EXPERIENCE","method":"printed heading","endPage":1,"endAt":382,"startToken":39,"endToken":53},{"p":1,"at":382,"title":"A. My name is D. Eric Arzola. My business address is 16150 Main Circle Drive, Suite 310,","method":"printed heading","endPage":1,"endAt":1050,"startToken":53,"endToken":167},{"p":1,"at":1050,"title":"A. Yes. I have submitted testimony in FERC Docket Nos. ER22-221, ER23-206, ER24-","method":"printed heading","endPage":2,"endAt":834,"startToken":167,"endToken":322},{"p":2,"at":834,"title":"II. PURPOSE AND SUMMARY OF TESTIMONY","method":"printed heading","endPage":2,"endAt":925,"startToken":322,"endToken":338},{"p":2,"at":925,"title":"A. The purpose of my testimony is to explain the revisions LSPGNY proposes to its","method":"printed heading","endPage":3,"endAt":309,"startToken":338,"endToken":547},{"p":3,"at":309,"title":"A. LSPGNY proposes the following changes:","method":"printed heading","endPage":4,"endAt":402,"startToken":547,"endToken":805},{"p":4,"at":402,"title":"A. No. The cost of service inputs, return, depreciation, taxes, and allocators are unchanged.","method":"printed heading","endPage":4,"endAt":1047,"startToken":805,"endToken":904},{"p":4,"at":1047,"title":"A. Yes. I am sponsoring the following exhibits:","method":"printed heading","endPage":5,"endAt":37,"startToken":904,"endToken":992},{"p":5,"at":37,"title":"III. LSPGNY AND FORMULA RATE BACKGROUND","method":"printed heading","endPage":5,"endAt":149,"startToken":992,"endToken":1011},{"p":5,"at":149,"title":"A. LSPGNY is a transmission-only company that owns Segment A, developed with the New","method":"printed heading","endPage":5,"endAt":774,"startToken":1011,"endToken":1114},{"p":5,"at":774,"title":"A. By September 30, LSPGNY posts an Annual Projection of its revenue requirement for","method":"printed heading","endPage":5,"endAt":1275,"startToken":1114,"endToken":1198},{"p":5,"at":1275,"title":"A. In the Show Cause Order, the Commission directed the NYISO and its transmission","method":"printed heading","endPage":6,"endAt":37,"startToken":1198,"endToken":1311},{"p":6,"at":37,"title":"IV. THE LARGE LOAD COST RECOVERY FRAMEWORK","method":"printed heading","endPage":6,"endAt":845,"startToken":1311,"endToken":1451},{"p":6,"at":845,"title":"A. The cost of each Covered Upgrade is included in LSPGNY’s rate base and revenue","method":"printed heading","endPage":6,"endAt":1350,"startToken":1451,"endToken":1530},{"p":6,"at":1350,"title":"A. The Supplemental MTRC is the amount, if any, by which an Eligible Customer’s Annual","method":"printed heading","endPage":7,"endAt":220,"startToken":1530,"endToken":1640},{"p":7,"at":220,"title":"A. The Supplemental MTRC follows the same projection and true-up cycle as the rest of the","method":"printed heading","endPage":7,"endAt":1049,"startToken":1640,"endToken":1768},{"p":7,"at":1049,"title":"A. Billing the projected amount during the Rate Year matches the timing of the","method":"printed heading","endPage":7,"endAt":1730,"startToken":1768,"endToken":1874},{"p":7,"at":1730,"title":"A. If an Eligible Customer terminates its CRA after an applicable in-service date, it pays a","method":"printed heading","endPage":8,"endAt":1284,"startToken":1874,"endToken":2106},{"p":8,"at":1284,"title":"A. The Supplemental MTRC and Annual Termination Fee Remittances (together, “Large","method":"printed heading","endPage":9,"endAt":257,"startToken":2106,"endToken":2265},{"p":9,"at":257,"title":"A. No. The return on equity (“ROE”) incentive the Commission granted for Segment A in","method":"printed heading","endPage":9,"endAt":1053,"startToken":2265,"endToken":2385},{"p":9,"at":1053,"title":"V. LSPGNY’S PROPOSED FORMULA RATE TEMPLATE CHANGES","method":"printed heading","endPage":9,"endAt":1148,"startToken":2385,"endToken":2400},{"p":9,"at":1148,"title":"A. The existing Formula Rate Template reports transmission plant only in total. To identify","method":"printed heading","endPage":9,"endAt":1459,"startToken":2400,"endToken":2447},{"p":9,"at":1459,"title":"A. Attachment 2a has five sections, each with a line for Segment A and lines for Covered","method":"printed heading","endPage":10,"endAt":773,"startToken":2447,"endToken":2631},{"p":10,"at":773,"title":"A. LSPGNY proposes a new Line 5a, Large Load CRA Revenue – Supplemental MTRC","method":"printed heading","endPage":10,"endAt":1710,"startToken":2631,"endToken":2791},{"p":10,"at":1710,"title":"A. Revenue credits are the Formula Rate Template’s existing means of passing revenue back","method":"printed heading","endPage":11,"endAt":294,"startToken":2791,"endToken":2868},{"p":11,"at":294,"title":"A. Attachment 1a calculates Projected Large Load CRA Revenue, and records Actual Large","method":"printed heading","endPage":12,"endAt":250,"startToken":2868,"endToken":3145},{"p":12,"at":250,"title":"A. Lines 24–34 are completed in the Annual Update. For each Eligible Customer and","method":"printed heading","endPage":12,"endAt":1320,"startToken":3145,"endToken":3322},{"p":12,"at":1320,"title":"A. New lines a1 through c on Appendix A show the Large Load CRA Revenue the NYISO","method":"printed heading","endPage":13,"endAt":93,"startToken":3322,"endToken":3440},{"p":13,"at":93,"title":"A. LSPGNY proposes a new section, Lines 14–24, that trues up the Supplemental MTRC","method":"printed heading","endPage":13,"endAt":943,"startToken":3440,"endToken":3581},{"p":13,"at":943,"title":"A. The difference between projected and actual Qualifying Transmission Revenues relates to","method":"printed heading","endPage":14,"endAt":838,"startToken":3581,"endToken":3866},{"p":14,"at":838,"title":"A. Attachment 1a reports information by Eligible Customer and Covered Upgrade. Under","method":"printed heading","endPage":14,"endAt":1408,"startToken":3866,"endToken":3947},{"p":14,"at":1408,"title":"A. Yes. Attachments 1a and 2a are added to the Index. In addition, LSPGNY proposes the","method":"printed heading","endPage":14,"endAt":1563,"startToken":3947,"endToken":3972},{"p":14,"at":1563,"title":"VI. MINISTERIAL CORRECTIONS","method":"printed heading","endPage":14,"endAt":1672,"startToken":3972,"endToken":3986},{"p":14,"at":1672,"title":"A. LSPGNY proposes the following corrections to the existing Formula Rate Template:","method":"printed heading","endPage":15,"endAt":432,"startToken":3986,"endToken":4074},{"p":15,"at":432,"title":"A. No. Each correction conforms a formula or label to the methodology the Commission","method":"printed heading","endPage":15,"endAt":560,"startToken":4074,"endToken":4095},{"p":15,"at":560,"title":"VII. FORMULA RATE IMPLEMENTATION PROTOCOLS","method":"printed heading","endPage":15,"endAt":702,"startToken":4095,"endToken":4115},{"p":15,"at":702,"title":"A. LSPGNY proposes the following changes:","method":"printed heading","endPage":16,"endAt":1594,"startToken":4115,"endToken":4506},{"p":16,"at":1594,"title":"A. The existing posting, review, challenge, and true-up procedures apply to the Large Load","method":"printed heading","endPage":17,"endAt":433,"startToken":4506,"endToken":4600},{"p":17,"at":433,"title":"VIII. NATIVE AND ILLUSTRATIVE FORMULA RATE TEMPLATES","method":"printed heading","endPage":17,"endAt":535,"startToken":4600,"endToken":4615},{"p":17,"at":535,"title":"A. Exhibit No. GNY-203 is the revised Formula Rate Template in native Excel format with","method":"printed heading","endPage":17,"endAt":892,"startToken":4615,"endToken":4675},{"p":17,"at":892,"title":"A. Exhibit No. GNY-204 is the revised Formula Rate Template populated with hypothetical","method":"printed heading","endPage":18,"endAt":989,"startToken":4675,"endToken":4983},{"p":18,"at":989,"title":"A. Exhibit No. GNY-205 is the revised Formula Rate Template populated with hypothetical","method":"printed heading","endPage":19,"endAt":1104,"startToken":4983,"endToken":5299},{"p":19,"at":1104,"title":"IX. CONCLUSION","method":"printed heading","endPage":19,"endAt":1186,"startToken":5299,"endToken":5312},{"p":19,"at":1186,"title":"A. The revisions implement the Commission’s direction that large load payments be credited","method":"printed heading","endPage":20,"endAt":259,"startToken":5312,"endToken":5458},{"p":20,"at":259,"title":"A. Yes.","method":"printed heading","endPage":21,"endAt":506,"startToken":5458,"endToken":5535},{"p":21,"at":506,"title":"D. Eric Arzola","method":"printed heading","endPage":21,"endAt":555,"startToken":5535,"endToken":5542}]}