{"document":{"slug":"rec-20261116-5286-9","title":"Exhibit No. GNY-207 to Arzola Testimony","issued":"2026-11-16","accession":"20261116-5286","docket":"ER27-518-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"LS Power Grid New York Corporation INew York Independent System Operator, Inc.","kind":"attachment","file":"sources/filings/text/20261116-5286_015.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5286","tier":"record","parent":"rec-20261116-5286","sha256":"5666d99fbd8bdce4ff7b56b3c4c38129a58b56a3121947478d0a81b9f526c951","pages":22,"tokens":5927,"emptyPages":[],"textThemes":["cost"]},"pages":[{"page":1,"startToken":0,"endToken":311,"text":"6.10.7.2.2 \nLS Power Grid New York Corporation I Formula Rate Implementation \nProtocols \nThe formula rate template (“Formula Rate Template” or “Template”) and the following \nprocedures (“Protocols”) together comprise the filed rate (“Formula Rate”) of LS Power Grid New \nYork Corporation I (“LSPG-NY”) for transmission revenue requirement determinations under the ISO \nOATT.  LSPG-NY shall follow the instructions specified in the Formula Rate to annually \ncalculate its actual net adjusted revenue requirement set forth at page 1, line 5 of the Template \n(“Net Adjusted Revenue Requirement”). The Net Adjusted Revenue Requirement shall be \ndetermined for January 1 to December 31 of a given calendar year (the “Rate Year”).  The \nFormula Rate shall become effective for recovery of LSPG-NY’s Net Adjusted Revenue \nRequirement upon the effective date for incorporation into the ISO OATT through an \nappropriate filing with the Commission under Section 205 of the Federal Power Act (“FPA”). \nAs used in these Protocols and the Formula Rate Template: (i) “Cost Recovery \nAgreement” or “CRA” means a Large Load Cost Recovery Agreement between LSPG-NY \nand an Eligible Customer entered into in the form established under the large load provisions \nof Rate Schedule 10 of the ISO OATT (“Rate Schedule 10 Large Load Provisions”); (ii) \n“Eligible Customer” has the meaning set forth in the ISO OATT and, when used with respect \nto a CRA, means the Eligible Customer that is a party to that CRA, including any Successor \nEligible Customer; (iii) “Annual MTRC” means the annual Minimum Transmission Revenue \nContribution for a Covered Upgrade, as defined in and calculated solely under the MTRC \nCalculation Template in the applicable CRA; (iv) “Qualifying Transmission Revenues” \nmeans the transmission revenues that count toward an Annual MTRC, as defined in and \ndetermined in accordance with the applicable CRA; (v) “Supplemental MTRC” means the \namount, if any, by which an Annual MTRC exceeds the corresponding Qualifying"},{"page":2,"startToken":311,"endToken":610,"text":"Transmission Revenues, as determined under the applicable CRA; (vi) “Large Load CRA \nRevenue” means, for a Rate Year, the Projected Large Load CRA Revenue or the Actual \nLarge Load CRA Revenue, as applicable, which shall be credited in the Formula Rate as set \nforth in the Template; (vii) “Projected Large Load CRA Revenue” means the Supplemental \nMTRC (including any prior-period true-up adjustment) projected to be billed under a CRA for \nthe Rate Year and the Annual Termination Fee Remittances projected to be received for the \nRate Year, and does not include expected collections of amounts unpaid in a prior Rate Year; \nand (viii) “Actual Large Load CRA Revenue” means the amounts LSPG-NY receives during \nthe Rate Year under a CRA, consisting of Supplemental MTRC payments collected and \nremitted by the ISO, Applied Security Proceeds applied to a Supplemental MTRC obligation \nand remitted by the ISO, amounts LSPG-NY recovers directly from an Eligible Customer and \napplies to a Supplemental MTRC obligation, and Annual Termination Fee Remittances, \nwhether the amount was billed in that Rate Year or an earlier Rate Year. Other capitalized \nterms used in these Protocols in connection with a CRA, including Actual Load Data, Annual \nTermination Fee Remittance, Applied Security Proceeds, Covered Upgrade, Large Load \nCharge, Large Load Customer, Large Load-Driven Upgrade, Large Load Facility, Load \nForecast, MTRC Calculation Template, Required Operational Security, Successor Eligible \nCustomer, Supplemental MTRC Receipts, Termination Fee, and Total Required Revenue \nCommitment, and the term “prior-period true-up adjustment,” have the meanings given in the \napplicable CRA. The Annual MTRC is determined solely under the applicable CRA and is \nnot calculated under the Formula Rate; it is entered in the Template as set forth therein. \nSection 1. \nAnnual Projection \n \nA. \nOn or before September 30 preceding the first Rate Year and each subsequent Rate Year"},{"page":3,"startToken":610,"endToken":905,"text":"thereafter, LSPG-NY shall determine its projected Net Adjusted Revenue Requirement \nfor the upcoming Rate Year in accordance with its Formula Rate (“Annual Projection”). \nThe Annual Projection shall include the True-up Adjustment described and defined in \nSection 2, if applicable.   \nB.  \nPosting and Notice of the Annual Projection. LSPG-NY shall cause its Annual Projection \nto be posted in both a Portable Document Format (PDF) and fully-functioning Excel \nformat at a publicly accessible location on the ISO website.  Such posting shall include (i) \nall inputs in sufficient detail to identify the components of LSPG-NY’s Annual \nProjections, and (ii) explanations of the bases for the projections and input data.  If the \ndate for making such posting of the Annual Projection should fall on a weekend or a \nholiday recognized by FERC, then the posting shall be made no later than the next \nbusiness day.  Within ten (10) days of posting the projected Net Adjusted Revenue \nRequirement, LSPG-NY shall provide notice of such posting to the Service List. As used \nin these protocolsProtocols, “Service List” shall mean (i) the email list of the ISO OATT \nTransmission Customers maintained by ISO; (ii) any state regulatory agency with rate \njurisdiction over a public utility located within the ISO footprint; and (iii) any consumer \nadvocate agency authorized by state law to review and contest the rates for any such \npublic utility, provided such consumer advocate agency requests to be placed on the \nService List and provides an email address to LSPG-NY; and (iv) each Eligible Customer \nthat is a party to a CRA, each Large Load Customer under a CRA, and each Successor \nEligible Customer under a CRA. \nFor the determination of the initial Rate Year’s projected Net Adjusted Revenue \nRequirement, balances for capital costs reflected in the Formula Rate Template that"},{"page":4,"startToken":905,"endToken":1181,"text":"subsequently use a 13 month average will be divided by the number of months the \nFormula Rate is in effect to calculate the monthly projected cost of service to be collected \neach month of the first year. The remaining inputs used in the Formula Rate Template- \nwill be developed in accordance with the Formula Rate Template. \nC. \nRevisions to the Annual Projection.  If LSPG-NY makes changes in the Annual \nProjection for a given Rate Year, LSPG-NY shall cause such revised Annual Projection to \nbe promptly posted at a publicly accessible location on the ISO website and distribute \nnotice to the Service List. Changes posted prior to October 31 of the preceding Rate Year, \nor the next business day if October 31 is not a business day, shall be reflected in the \nAnnual Projection for the Rate Year; changes posted after that date will be reflected, as \nappropriate, in the True-up Adjustment for the Rate Year.  \nD. \nReview and Challenge of the Annual Projection.  The Annual Projection, including the \nTrue-Up Adjustment, for each Rate Year shall be subject to review, challenge, true-up and \nrefunds or surcharges with interest, to the extent and in the manner provided in these \nProtocols. \nE. \nThe projected Net Adjusted Revenue Requirement shall: \n1. \nInclude a workable, data-populated Formula Rate Template and underlying \nwork papers in native format with all formulas and links intact; \n2. \nProvide the formula rate calculations and all inputs thereto, as well as \nsupporting documentation and work papers for data that are used in the \nprojected Net Adjusted Revenue Requirement; \n3. \nProvide sufficient information to enable interested persons to replicate the \ncalculation of the projected Net Adjusted Revenue Requirement;"},{"page":5,"startToken":1181,"endToken":1388,"text":"4. \nProvide a work paper demonstrating compliance with the cost containment \ncommitments set forth in the Formula Rate Template, which shall identify \neach Large Load-Driven Upgrade separately from any investment subject to \nsuch commitments;  \n5. \nWith respect to any change in accounting that affects inputs to the formula rate \nor the resulting charges billed under the formula rate (“Accounting Change”): \na. \nIdentify any Accounting Changes, including: \n \ni. \nthe initial implementation of an accounting standard or policy; \nii. \nthe initial implementation of accounting practices for unusual or \nunconventional items where FERC has not provided specific \naccounting direction; \niii. \ncorrection of errors and prior period adjustments that impact the \nprojected Net Adjusted Revenue Requirement calculation; \niv. \nthe implementation of new estimation methods or policies that \nchange prior estimates; and \nv. \nchanges to income tax elections; \n \nb. \nIdentify items included in the projected Net Adjusted Revenue \nRequirement at an amount other than on a historic cost basis (e.g., fair \nvalue adjustments); \nc. \nIdentify any reorganization or merger transaction during the previous year \nand explain the effect of the accounting for such transaction(s) on inputs to \nthe projected Net Adjusted Revenue Requirement; and \nd. \nProvide, for each item identified pursuant to items in Section 1.E.5.a-c of"},{"page":6,"startToken":1388,"endToken":1636,"text":"these Protocols, a narrative explanation of the individual impact of such \nchanges on the projected Net Adjusted Revenue Requirement. \n6. \nProvide upgrade-specific work papers, organized by Eligible Customer, \nLarge Load Facility, and Covered Upgrade, showing for each CRA the \napplicable Annual MTRC, forecast Qualifying Transmission Revenues, \nprojected Supplemental MTRC, any prior-period true-up adjustment, the \nAnnual Termination Fee Remittances scheduled to be remitted during the \nRate Year, Total Required Revenue Commitment, Required Operational \nSecurity, and any unpaid Supplemental MTRC carried forward from a prior \nRate Year (which is not included in Projected Large Load CRA Revenue), \nand reconciling those amounts to the Projected Large Load CRA Revenue, \nsubject to Section 8 of these Protocols. \nF. \nJoint Informational Meeting.  Transmission Owners with transmission projects that \nutilize a regional or inter-regional cost sharing mechanism shall endeavor to hold a joint \ninformational meeting to enable all interested parties to understand how those \nTransmission Owners are implementing their formula rates for cost recovery of such \nprojects (“Joint Informational Meeting”). Notice of the Joint Informational Meeting, \nincluding the time, date, and location, shall be posted on the LSPG-NY website and \ndistributed to the Service List no less than seven (7) days prior to such meeting, and the \nTransmission Owners shall provide remote access to Joint Informational Meetings to \nallow all interested parties the opportunity to remotely participate in such meetings. \nLSPG-NY will participate in Joint Informational Meetings once it begins development of \na project for which costs are to be regionally or inter-regionally allocated."},{"page":7,"startToken":1636,"endToken":1927,"text":"Section 2. \nCalculation of True-Up Adjustment \n \nA. \nLSPG-NY will calculate the amount of under-or-over-collection of its actual Net Revenue \nRequirement during the preceding Rate Year (“True-up Up Adjustment”) after the FERC \nForm No.1 data for that Rate Year has been filed with the Commission.  The True-Up \nAdjustment shall be the sum of the True-Up Adjustment over/under recovery as \ndetermined in Section 2.B and the Interest on the True-Up Adjustment over/under \nrecovery as determined in Section 2.C. \nB. \nCalculation of the True-Up Adjustment.  To determine any over or under recovery, LSPG-\nNY’s projected Net Revenue Requirement collected during the previous Rate Year will be \ncompared to LSPG-NY’s actual Net Revenue Requirement for the previous Rate Year.  \nLSPG-NY shall calculate its actual Net Revenue Requirement for the previous Rate Year \nin accordance with LSPG-NY’s Formula Rate and based upon: (i) LSPG-NY’s FERC \nForm No. 1 for that same Rate Year; (ii) any FERC orders specifically applicable to \nLSPG-NY’s calculation of its annual revenue requirement; (iii) the books and records of \nLSPG-NY (which shall be maintained consistent with the FERC Uniform System of \nAccounts (“USofA”)); (iv) FERC accounting policies and practices applicable to the \ncalculation of annual revenue requirements under formula rates; and (v) any aspects of \nthe ISO OATT and other governing documents that apply to the calculation of annual \nrevenue requirements under individual transmission owner formula rates to determine \nany over-or-under-recovery. Notwithstanding anything to the contrary herein, if the initial \nyear of this rate schedule is a partial year, the initial projected Net Revenue Requirement \nwill be divided by the number of months the Formula Rate is in effect to calculate the \nmonthly projected cost of service to be collected each month of the first year. Similarly,"},{"page":8,"startToken":1927,"endToken":2221,"text":"the actual Net Revenue Requirement will be divided by the number of months the rate is \nin effect to calculate the actual cost of service to be collected each month of the first year. \nThe first True-up Adjustment will compare the projected Net Revenue Requirement \nbilled and the actual Net Revenue Requirement for that initial Rate Year. \nIn determining the over or under recovery under this Section 2.B, the actual Net \nRevenue Requirement for the previous Rate Year shall reflect the Actual Large Load CRA \nRevenue for that Rate Year in place of the Projected Large Load CRA Revenue reflected in \nthe Annual Projection for that Rate Year, and any difference, including any difference \nresulting from a billed amount that is not received, shall be reconciled through the True-Up \nAdjustment, with interest calculated as provided in Section 2.C. A billed amount that is not \nreceived during the Rate Year is not included in Actual Large Load CRA Revenue and \nremains owed by the Eligible Customer; when that amount is later received, including \nthrough Applied Security Proceeds or amounts LSPG-NY recovers directly from an Eligible \nCustomer, it shall be included in Actual Large Load CRA Revenue for the Rate Year in which \nit is received, and no amount shall be included more than once. This True-Up Adjustment is \nseparate from the prior-period true-up adjustment of an Eligible Customer’s Supplemental \nMTRC under the applicable CRA, which is calculated without interest. Any previously \ncredited amount that LSPG-NY returns to an Eligible Customer shall be reversed in the next \npracticable Annual Update and True-Up Adjustment. \nC. \nInterest.  Interest on any True-up Adjustment over/under recovery of the actual Net \nRevenue Requirement shall be calculated in accordance with the Formula Rate true-up \nworksheet. \nSection 3. \nAnnual Update"},{"page":9,"startToken":2221,"endToken":2523,"text":"A. \nOn or before June 30 following each Rate Year, LSPG-NY shall calculate its actual Net \nAdjusted Revenue Requirement including the True-up Adjustment, as described in Section \n2, for each Rate Year (“Annual Update”).  \nB. \nPosting and Notice of the Annual Update.  No later than June 30 following each Rate \nYear, LSPG-NY shall cause its Annual Update to be posted in both a PDF and fully \nfunctioning Excel format at a publicly accessible location on the ISO website. Within \nten (10) days of such posting, LSPG-NY shall provide notice of such posting to the \nService List.  The date on which the last of the events listed in this Section 3.B occurs \nshall be that year’s “Publication Date.”  If the date for making such posting of the Annual \nUpdate should fall on a weekend or a holiday recognized by FERC, then the posting shall \nbe due the next business day.  In addition, within ten (10) days of the Publication Date the \nAnnual Update shall be submitted as an informational filing with the FERC. \nC. \nThe Annual Update for the Rate Year shall: \n1. \nInclude a workable data-populated Formula Rate Template and underlying \nwork papers in native format with all formulas and links intact; \n2. \nBe based on LSPG-NY’s FERC Form No. 1 for the prior calendar year; \n3. \nProvide the formula rate calculations and all inputs thereto, as well as \nsupporting documentation and work papers for data that are used in the \nAnnual Update that are not otherwise available in FERC Form No. 1. It is the \nintent of the formula rate, including the supporting explanations and \nallocations described therein, that each input to the formula rate will be \neither taken directly from FERC Form No. 1 or reconcilable to FERC \nForm No. 1 by the application of clearly identified and supported"},{"page":10,"startToken":2523,"endToken":2748,"text":"information. If the referenced form is superseded, the successor form(s) \nshall be utilized and supplemented as necessary to provide equivalent \ninformation as that provided in the superseded form. If the referenced \nform(s) is (are) discontinued, equivalent information as that provided in \nthe discontinued form(s) shall be utilized; \n4. \nProvide sufficient information to enable interested persons to replicate the \ncalculation of the Annual Update results from FERC Form No. 1; \n5. \nProvide a work paper demonstrating compliance with the cost containment \ncommitments set forth in the Formula Rate Template, which shall identify \neach Large Load-Driven Upgrade separately from any investment subject to \nsuch commitments;  \n6. \nIdentify payments, if any, to NYPA for operations and maintenance.  To the \nextent there is any mark-up in the operations and maintenance costs incurred \nby NYPA and charged to LSPG-NY, LSPG-NY shall justify the mark-up as \nan appropriate expense to be recovered under the formula rate.  ; \n7. \nIdentify any changes in the formula references (page and line numbers) to \nFERC  \nForm No. 1; \n8. \nIdentify all material adjustments made to the FERC Form No. 1 data in \ndetermining formula inputs, including relevant footnotes to FERC Form \nNo. 1 and any adjustments not shown in FERC Form No. 1; \n9. \nProvide underlying data for formula rate inputs that provide greater \ngranularity than is required for FERC Form No. 1;"},{"page":11,"startToken":2748,"endToken":2961,"text":"10. \nWith respect to any change in accounting that affects inputs to the formula rate \nor the resulting charges billed under the formula rate (“Accounting Change”): \na. \nIdentify any Accounting Changes, including: \n \ni.  \nthe initial implementation of an accounting standard or policy; \nii. \nthe initial implementation of accounting practices for unusual or \nunconventional items where FERC has not provided specific \naccounting direction; \niii. \ncorrection of errors and prior period adjustments that impact the \nTrue-Up Adjustment calculation; \niv. \nthe implementation of new estimation methods or policies that \nchange prior estimates; and \nv. \nchanges to income tax elections; \nb. \nIdentify items included in the Annual Update at an amount other than on \na historic cost basis (e.g., fair value adjustments); \nc. \nIdentify any reorganization or merger transaction during the previous \nyear and explain the effect of the accounting for such transaction(s) on \ninputs to the Annual Update; and \nd. \nProvide, for each item identified pursuant to items 3.C.910.a-c of \nthese Protocols, a narrative explanation of the individual impact of \nsuch changes on the True-Up Adjustment.; \n11. \nProvide work papers, organized by Eligible Customer, Large Load Facility, \nand Covered Upgrade, reconciling the Projected Large Load CRA Revenue \nfor the Rate Year and the Actual Large Load CRA Revenue credited for the"},{"page":12,"startToken":2961,"endToken":3205,"text":"Rate Year to the applicable Annual MTRC, forecast and actual Qualifying \nTransmission Revenues, Supplemental MTRC billed, prior-period true-up \nadjustments, Supplemental MTRC payments collected and remitted by the \nISO, Applied Security Proceeds, amounts recovered directly from an \nEligible Customer, Annual Termination Fee Remittances, refunds, and \nopening and closing unpaid Supplemental MTRC balances, reconciling the \nActual Large Load CRA Revenue to the amounts recorded in LSPG-NY’s \nFERC Form No. 1, and identifying the resulting difference reconciled \nthrough the True-Up Adjustment, subject to Section 8 of these Protocols; \nand \n1112. Shall not seek to modify the Formula Rate and shall not be subject to \nchallenge by any interested person seeking to modify the Formula Rate. \n(i.e., any modifications to the Formula Rate will require, as applicable, an \nFPA Section 205 or Section 206 filing or initiation of a Section 206 \ninvestigation). \nD. \nAnnual Update Meeting.  No less than twenty (20) business days and no more than thirty \n(30) business days after June 30, LSPG-NY shall hold an open meeting among interested \npersons (“Annual Update Meeting”) in order for LSPG-NY to explain its Annual Update \nand to provide interested persons an opportunity to seek information and clarifications \nregarding the Annual Update. No less than seven (7) days prior to such Annual Update \nMeeting, LSPG-NY shall cause notice to be posted on the ISO’s website of the time, \ndate, and location of the Annual Update Meeting and LSPG-NY shall provide notice of \nsuch meeting to the Service List."},{"page":13,"startToken":3205,"endToken":3505,"text":"E. \nExample – Timeline for 2022 Annual Update: On or before September 30, 2021, LSPG-\nNY will determine the projected Net Adjusted Revenue Requirement for the 2022 Rate \nYear, which is expected to be the first year that costs are recovered from Transmission \nCustomers under the Formula Rate. LSPG-NY will post the Annual Projection for the \n2022 Rate Year in accordance with Section 1 above. LSPG-NY will not determine a True-\nup Adjustment or post an Annual Update on June 30, 2022 if no costs have been \nrecovered under the Formula Rate during 2021. On or before September 30, 2022, LSPG-\nNY will post the Annual Projection for the 2023 Rate Year. On or before June 30, 2023, \nLSPG-NY will post its first Annual Update, calculating the True-up Adjustment for the \n2022 Rate Year determined pursuant to Section 2 above. Such True-up Adjustment will \nbe reflected in the Annual Projection of the Net Adjusted Revenue Requirement for the \n2024 Rate Year posted on or before September 30, 2023. The Annual Update posted on or \nbefore June 30, 2023 will be subject to the customer review and challenge procedures \ndescribed in Sections 4 and 5 of these Protocols.  \nSection 4. \nAnnual Review Procedures \n \nThe Annual Update and Annual Projection for each Rate Year shall be subject to the following \nreview procedures (“Annual Review Procedures”): \nA. \nInformation Request Deadline.  interested Interested parties shall have up to one hundred \ntwenty (120) calendar days after the Publication Date (unless such period is extended \nwith the written consent of LSPG-NY or by FERC order) to serve reasonable information \nrequests on LSPG-NY as described in Section 4.B.  \nB. \nLimitations on Scope.  Such information and document requests shall be limited to what \nis necessary to determine: (1) the extent or effect of an Accounting Change; (2) whether"},{"page":14,"startToken":3505,"endToken":3792,"text":"the Annual Update or Annual Projection fails to include data properly recorded in \naccordance with these protocolsProtocols; (3) the proper application of the Formula Rate \nand procedures in these protocolsProtocols; (4) the accuracy of data and consistency with \nthe formula rate of the calculations shown in the Annual Update or Annual Projection; (5) \nthe prudence of actual costs and expenditures; (6) the effect of any change to the \nunderlying Uniform System of Accounts or FERC Form No. 1; or (7) any other \ninformation that may reasonably have substantive effect on the calculation of the charge \npursuant to the formula.  The information and document requests shall not otherwise be \ndirected to ascertaining whether the formula rate is just and reasonable. \nC. \nResponses to Information Requests.  LSPG-NY shall make a good faith effort to respond \nto information and document requests within ten (10) business days of receipt of such \nrequests.  In the event an information request is not provided within 10 business days, the \nparties will mutually agree on an extension of the Review Period. \nD. \nPublic Availability of Information Requests and Responses.  LSPG-NY will cause to be \nposted on the ISO website all information requests from interested parties and LSPG-\nNY’s response(s) to such requests; except, however, if responses to information and \ndocument requests include material deemed by LSPG-NY to be confidential information, \nsuch information will not be publicly posted but will be made available to requesting \nparties pursuant to a confidentiality agreement to be executed by LSPG-NY and the \nrequesting party. \nE. \nPrivilege.   LSPG-NY shall not claim that responses to information and document \nrequests provided pursuant to these protocols Protocols are subject to any settlement \nprivilege in any subsequent FERC proceeding addressing LSPG-NY’s Annual Update or"},{"page":15,"startToken":3792,"endToken":4076,"text":"Annual Projection. \nSection 5. \nChallenge Procedures \n \nA. \nInformal Challenge Deadlines. interested persons shall have until the latest of one \nhundred fifty (150) calendar days after the Publication Date, thirty (30) calendar days \nafter the receipt of all responses to timely submitted information requests (unless such \nperiod is extended with the written consent of LSPG-NY or by FERC order), or thirty \n(30) calendar days after resolution of a dispute that does not result in the production of \nadditional information (“Review Period”), to review the calculations and to notify LSPG-\nNY in writing of any specific challenges that fall within the parameters as defined in the \nLimitations on Scope in Section 5.G of these Protocols (“Informal Challenge”). Failure to \npursue an issue through an Informal Challenge or to lodge a Formal Challenge regarding \nany issue as to a given Annual Update or Annual Projection shall bar pursuit of such \nissue with respect to that Annual Update or Annual Projection, but shall not bar pursuit of \nsuch issue or the lodging of a Formal Challenge as to such issue as it relates to a \nsubsequent Annual Update or Annual Projection  \nB. \nContents, Scope, and Response. An interested party submitting an Informal Challenge to \nLSPG-NY must specify the inputs, supporting explanations, allocations, calculations, or \nother information to which it objects, and provide an appropriate explanation and \ndocuments to support its challenge. LSPG-NY shall respond to any Informal Challenge \nwithin twenty (20) business days of notification of such challenge. LSPG-NY, and where \napplicable, the Transmission Provider, shall appoint a senior representative to work with \nthe party that submitted the Informal Challenge (or its representative) toward a \nresolution of the challenge. If LSPG-NY disagrees with such challenge, LSPG-NY will"},{"page":16,"startToken":4076,"endToken":4363,"text":"provide the interested person(s) with an explanation supporting the inputs, supporting \nexplanations, allocations, calculations, or other information. \nC. \nPublic Availability of Informal Challenges.  LSPG-NY will cause to be posted at a \npublicly-accessible location on the ISO website all Informal Challenges from interested \npersons and LSPG-NY’s response(s) to such Informal Challenges; except, however, if \nInformal Challenges or responses to Informal Challenges include material deemed by \nLSPG-NY to be confidential information, such information will not be publicly posted \nbut will be made available to requesting parties pursuant to a confidentiality agreement to \nbe executed by LSPG-NY and the requesting party. \nD. \nRemedies. Any changes or adjustments to the Annual Update or Annual Projection \nresulting from the Informal Challenge process that are agreed to by LSPG-NY will be \nreported in the informational filing required pursuant to Section 3 of these Protocols. \nAny such changes or adjustments agreed to by LSPG-NY on or before December 1 will \nbe reflected in the projected Net Adjusted Revenue Requirement for the upcoming Rate \nYear. Any changes or adjustments agreed to by LSPG-NY after December 1 will be \nreflected in the following year’s Annual Update. \nE. \nFormal Challenge Deadlines. Any interested persons may file a challenge with the FERC \n(“Formal Challenge”) contesting some action or inaction by LSPG-NY with respect to \nthe Annual Update or Annual Projection, and shall do so no later than sixty (60) calendar \ndays following the end of the Review Period (unless such date is extended with the written \nconsent of LSPG-NY to continue efforts to resolve the Informal Challenge). A Formal \nChallenge shall be filed in the same docket as LSPG-NY’s informational filing discussed \nin Section 3 of these Protocols. LSPG-NY shall respond to the Formal Challenge by"},{"page":17,"startToken":4363,"endToken":4610,"text":"submitting any response to FERC within thirty (30) calendar days of the date of the filing \nof the Formal Challenge, and LSPG-NY shall serve on the filing party(ies) and the \nService List by electronic service on the date of such filing. A party may not pursue a \nFormal Challenge on a specific issue if that party did not submit an Informal Challenge on \nthe issue during the applicable Review Period. \nF. \nContents of Formal Challenges.  Formal Challenges shall be filed pursuant to these \nProtocols. All information and correspondence produced by LSPG-NY pursuant to these \nProtocols may be included in any Formal Challenge or other FERC proceeding relating to \nthe Formula Rate, subject to any applicable confidentiality and Critical Energy \nInfrastructure Information restrictions.   Formal Challenges shall be filed pursuant to \nthese Protocols and shall satisfy all of the following requirements. \n(1) \nA Formal Challenge shall: \n \n(a) \nClearly identify the action or inaction which is alleged to violate the filed \nFormula Rate Template or Protocols; \n(b) \nExplain how the action or inaction violates the Formula Rate or Protocols; \n(c) \nSet forth the business, commercial, economic or other issues presented by \nthe action or inaction as such relate to or affect the party filing the Formal \nChallenge, including: \n(i) \nthe extent or effect of an Accounting Change; \n(ii) \nwhether the Annual Update or Annual Projection fails to include \ndata properly recorded in accordance with these Protocols; \n(iii) \nthe proper application of the Formula Rate and procedures in the \nProtocols;"},{"page":18,"startToken":4610,"endToken":4854,"text":"(iv) \nthe accuracy of data and consistency with the formula rate of the \ncharges shown in the Annual Update or Annual Projection; \n(v) \nthe prudence of actual costs and expenditures; \n(vi) \nthe effect of any change to the underlying Uniform System of \nAccounts or FERC Form 1; or \n(vii) \nany other information that may reasonably have substantive effect \non the calculation of the charge pursuant to the Formula Rate. \n(d) \nMake a good faith effort to quantify the financial impact or burden (if any) \ncreated for the party filing the Formal Challenge as a result of the action or \ninaction; \n(e) \nState whether the issues presented are pending in an existing Commission \nproceeding or a proceeding in any other forum in which the filing party is \na party, and if so, provide an explanation why timely resolution cannot be \nachieved in that forum; \n(f) \nState the specific relief or remedy requested, including any request for stay \nor extension of time, and the basis for that relief; \n(g) \nInclude all documents that support the facts in the Formal Challenge in \npossession of, or otherwise attainable by, the filing party, including, but \nnot limited to, contracts and affidavits; and \n(h) \nState whether the filing party utilized the Informal Challenge procedures \ndescribed in these Protocols to dispute the action or inaction raised by the \nFormal Challenge, and, if not, describe why not. \n(2) \nService. Any person filing a Formal Challenge must serve a copy of the Formal"},{"page":19,"startToken":4854,"endToken":5136,"text":"Challenge on LSPG-NY. Service to LSPG-NY must be simultaneous with filing at \nthe Commission. Simultaneous service can be accomplished by electronic mail in \naccordance with § 385.2010(f)(3) of FERC’s regulations, facsimile, express \ndelivery, or messenger. The party filing the Formal Challenge shall serve the \nindividual listed as the contact person on LSPG-NY’s Informational Filing \nrequired under Section 3 of these Protocols. \nG. \nLimitations on Scope.  Informal and Formal Challenges shall be limited to all issues that \nmay be necessary to determine: (1) the extent or effect of an Accounting Change; (2) \nwhether the Annual Update or Annual Projection fails to include data properly recorded \nin accordance with these Protocols; (3) the proper application of the formula rate and \nprocedures in these Protocols; (4) the accuracy of data and consistency with the formula \nrate of the calculations shown in the Annual Update or Annual Projection; (5) the \nprudence of actual costs and expenditures; (6) LSPG-NY’s compliance with the cost \ncontainment commitments reflected in the Formula Rate; (7) the effect of any change to \nthe underlying Uniform System of Accounts or FERC Form No. 1; or (8) any other \ninformation that may reasonably have substantive effect on the calculation of the charge \npursuant to the formula. \nH. \nBurden. In any Formal Challenge proceeding initiated by FERC concerning a given year’s \nAnnual Update or Accounting Changes, LSPG-NY shall bear the burden, consistent with \nsection 205 of the FPA, of proving that it has correctly applied the terms of the formula \nrate consistent with these Protocols, and that it followed the applicable requirements and \nprocedures in these Protocols. Nothing herein is intended to alter the burdens applied by \nFERC with respect to prudence challenges."},{"page":20,"startToken":5136,"endToken":5452,"text":"I. \nReservation of Rights under FPA Sections 205 and 206.  Except as specifically provided \nin these Protocols and subject to terms of certain Offer of Settlement and Stipulations \nfiled with FERC in setting LSPG-NY’s Formula Rate, nothing herein shall be deemed to \nlimit in any way the right of LSPG-NY to file unilaterally, pursuant to Section 205 of the \nFPA and the regulations thereunder, to change the formula rate or any of its inputs \n(including, but not limited to, an application seeking changes to the Formula Rate or any \nof the stated value inputs requiring a Section 205 filing under these Protocols including, \nbut not limited to, return on equity and depreciation rates), or the right of any interested \npersons of or the Commission to seek such changes pursuant to Section 206 of the FPA \nand the regulations thereunder. \nJ. \nAny interested party seeking changes to the application of the formula rate due to a \nchange in the Uniform System of Accounts or FERC Form No. 1, shall first raise the \nmatter with LSPG-NY before pursuing a Formal Challenge. \nSection 6. \nChanges to the Annual Update or Annual Projection  \nExcept as provided in Sections 4 and 5 of these Protocols, any changes to the data inputs, \nincluding but not limited to revisions to LSPG-NY’s FERC Form No. 1, or as the result of any \nFERC proceeding to consider the Annual Update or Annual Projection, or as a result of the \nprocedures set forth herein, shall be incorporated into the formula rate and the charges produced \nby the formula rate in the Annual Projection for the next Rate Year. This reconciliation \nmechanism shall apply in lieu of mid-Rate Year adjustments. Interest on any refund or surcharge \nshall be calculated in accordance with the procedures outlined in these Protocols. \nSection 7.  \nUpdates During Transmission Project Construction \nLSPG-NY anticipates that it will undertake development activities prior to having an"},{"page":21,"startToken":5452,"endToken":5778,"text":"obligation for an informational filing related to its Annual Update or which are outside the \nscope of the annual transmission revenue requirement for a particular Rate Year.  During the \nperiod of construction, on June 30 of each year or Rate Year as the case may be, LSPG-NY \nshall provide project cost updates to be included with its annual informational filing set forth \nin Section 3.B of these Protocols, information regarding any “Unforeseeable Costs” as that \nterm is defined in the Offer of Settlement approved by the Commission in Docket No. ER20-\n716-001, together with information demonstrating how such costs were determined to be \nUnforeseeable Costs.  In addition, to the extent that there are any “Third Party Costs,” as such \nterm is defined in the Offer of Settlement approved by the Commission in Docket No. ER20-\n716-001, arising under clause (iii) of the definition of Third Party Costs as set forth in the \nOffer of Settlement approved by the Commission in Docket No. ER20-716-001, LSPG-NY \nwill provide information on such Third Party Cost as part of project cost updates in its annual \ninformational filing, including information demonstrating how such costs were determined to \nbe Third Party Costs. \nIn addition to the project cost updates referenced above, within six months of placing \nthe entire “Segment A Project,” as is defined in the Offer of Settlement approved by the \nCommission in Docket No. ER20-716-001, in service, LSPG-NY will provide an \ninformational workpaper identifying the final assets owned by LSPG-NY and the NYPA \nrespectively, the total ratebase of the assets, details including accounting entries of any \ntransfers of assets that may have occurred between the parties that changed the ownership of \nany assets, the amount of any costs greater than the “Cost Cap” or less than the “Adjusted \nCost Cap” as those terms are defined in the Offer of Settlement approved by the Commission \nin Docket No. ER20-716-001, as the case may be, and details on the operations and"},{"page":22,"startToken":5778,"endToken":5927,"text":"maintenance costs incurred to date.  \nSection 8. \nCustomer-Specific Information \nNotwithstanding Sections 1.B and 3.B of these Protocols, information in the Annual \nProjection, Annual Update, or supporting work papers that is specific to an individual Eligible \nCustomer, Large Load Customer, or CRA, including Load Forecasts, Actual Load Data, and \ndocuments provided under a CRA, shall be treated as confidential information, subject to any \napplicable confidentiality provisions of the ISO OATT, the applicable CRA, and any \napplicable confidentiality agreement. LSPG-NY shall post and file versions of the Annual \nProjection, the Annual Update, and the work papers required by Sections 1.E.6 and 3.C.11 of \nthese Protocols that aggregate or redact such information, and shall make the unredacted \ninformation available to interested parties only pursuant to a confidentiality agreement as \nprovided in Section 4.D of these Protocols, and to the Commission in accordance with its \nregulations."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":1885,"startToken":0,"endToken":594},{"p":2,"at":1885,"title":"A. On or before September 30 preceding the first Rate Year and each subsequent Rate Year","method":"printed heading","endPage":3,"endAt":285,"startToken":594,"endToken":649},{"p":3,"at":285,"title":"B. Posting and Notice of the Annual Projection. LSPG-NY shall cause its Annual Projection","method":"printed heading","endPage":4,"endAt":327,"startToken":649,"endToken":961},{"p":4,"at":327,"title":"C. Revisions to the Annual Projection. If LSPG-NY makes changes in the Annual","method":"printed heading","endPage":4,"endAt":917,"startToken":961,"endToken":1060},{"p":4,"at":917,"title":"D. Review and Challenge of the Annual Projection. The Annual Projection, including the","method":"printed heading","endPage":4,"endAt":1198,"startToken":1060,"endToken":1103},{"p":4,"at":1198,"title":"E. The projected Net Adjusted Revenue Requirement shall:","method":"printed heading","endPage":6,"endAt":816,"startToken":1103,"endToken":1501},{"p":6,"at":816,"title":"F. Joint Informational Meeting. Transmission Owners with transmission projects that","method":"printed heading","endPage":7,"endAt":49,"startToken":1501,"endToken":1642},{"p":7,"at":49,"title":"A. LSPG-NY will calculate the amount of under-or-over-collection of its actual Net Revenue","method":"printed heading","endPage":7,"endAt":510,"startToken":1642,"endToken":1717},{"p":7,"at":510,"title":"B. Calculation of the True-Up Adjustment. To determine any over or under recovery, LSPG-","method":"printed heading","endPage":8,"endAt":1638,"startToken":1717,"endToken":2190},{"p":8,"at":1638,"title":"C. Interest. Interest on any True-up Adjustment over/under recovery of the actual Net","method":"printed heading","endPage":9,"endAt":0,"startToken":2190,"endToken":2221},{"p":9,"at":0,"title":"A. On or before June 30 following each Rate Year, LSPG-NY shall calculate its actual Net","method":"printed heading","endPage":9,"endAt":222,"startToken":2221,"endToken":2255},{"p":9,"at":222,"title":"B. Posting and Notice of the Annual Update. No later than June 30 following each Rate","method":"printed heading","endPage":9,"endAt":1007,"startToken":2255,"endToken":2394},{"p":9,"at":1007,"title":"C. The Annual Update for the Rate Year shall:","method":"printed heading","endPage":12,"endAt":955,"startToken":2394,"endToken":3100},{"p":12,"at":955,"title":"D. Annual Update Meeting. No less than twenty (20) business days and no more than thirty","method":"printed heading","endPage":13,"endAt":0,"startToken":3100,"endToken":3205},{"p":13,"at":0,"title":"E. Example – Timeline for 2022 Annual Update: On or before September 30, 2021, LSPG-","method":"printed heading","endPage":13,"endAt":1347,"startToken":3205,"endToken":3427},{"p":13,"at":1347,"title":"A. Information Request Deadline. interested Interested parties shall have up to one hundred","method":"printed heading","endPage":13,"endAt":1667,"startToken":3427,"endToken":3476},{"p":13,"at":1667,"title":"B. Limitations on Scope. Such information and document requests shall be limited to what","method":"printed heading","endPage":14,"endAt":768,"startToken":3476,"endToken":3624},{"p":14,"at":768,"title":"C. Responses to Information Requests. LSPG-NY shall make a good faith effort to respond","method":"printed heading","endPage":14,"endAt":1106,"startToken":3624,"endToken":3678},{"p":14,"at":1106,"title":"D. Public Availability of Information Requests and Responses. LSPG-NY will cause to be","method":"printed heading","endPage":14,"endAt":1641,"startToken":3678,"endToken":3757},{"p":14,"at":1641,"title":"E. Privilege. LSPG-NY shall not claim that responses to information and document","method":"printed heading","endPage":15,"endAt":56,"startToken":3757,"endToken":3798},{"p":15,"at":56,"title":"A. Informal Challenge Deadlines. interested persons shall have until the latest of one","method":"printed heading","endPage":15,"endAt":1173,"startToken":3798,"endToken":3980},{"p":15,"at":1173,"title":"B. Contents, Scope, and Response. An interested party submitting an Informal Challenge to","method":"printed heading","endPage":16,"endAt":152,"startToken":3980,"endToken":4094},{"p":16,"at":152,"title":"C. Public Availability of Informal Challenges. LSPG-NY will cause to be posted at a","method":"printed heading","endPage":16,"endAt":725,"startToken":4094,"endToken":4176},{"p":16,"at":725,"title":"D. Remedies. Any changes or adjustments to the Annual Update or Annual Projection","method":"printed heading","endPage":16,"endAt":1282,"startToken":4176,"endToken":4265},{"p":16,"at":1282,"title":"E. Formal Challenge Deadlines. Any interested persons may file a challenge with the FERC","method":"printed heading","endPage":17,"endAt":404,"startToken":4265,"endToken":4434},{"p":17,"at":404,"title":"F. Contents of Formal Challenges. Formal Challenges shall be filed pursuant to these","method":"printed heading","endPage":19,"endAt":434,"startToken":4434,"endToken":4917},{"p":19,"at":434,"title":"G. Limitations on Scope. Informal and Formal Challenges shall be limited to all issues that","method":"printed heading","endPage":19,"endAt":1331,"startToken":4917,"endToken":5060},{"p":19,"at":1331,"title":"H. Burden. In any Formal Challenge proceeding initiated by FERC concerning a given year’s","method":"printed heading","endPage":20,"endAt":0,"startToken":5060,"endToken":5136},{"p":20,"at":0,"title":"I. Reservation of Rights under FPA Sections 205 and 206. Except as specifically provided","method":"printed heading","endPage":22,"endAt":996,"startToken":5136,"endToken":5927}]}