{"document":{"slug":"rec-20261116-5311","title":"ER26-71 Order to Show Cause Tariff Revisions","issued":"2026-11-16","accession":"20261116-5311","docket":"ER27-521-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"San Diego Gas & Electric","kind":"tariff filing","file":"sources/filings/text/20261116-5311_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5311","tier":"record","sha256":"ba53fcd334660c18a045b25c33254b770838a019faeb155b0be2e0eed1f34883","pages":108,"tokens":28549,"emptyPages":[],"textThemes":["study","cost","flex","colo"]},"pages":[{"page":1,"startToken":0,"endToken":315,"text":"Jonathan J.  Newlander \nSenior Counsel \nSan Diego Gas & Electric Company \n8330 Century Park Court, CP32D \nSan Diego, CA  92123 \n \nTelephone: (858) 654-1652 \nEmail:   jnewlander@sdge.com \nNovember 16, 2026 \n \n \nThe Honorable Debbie-Anne A.  Reese \nSecretary \nFederal Energy Regulatory Commission \n888 First Street, N.E. \nWashington, D.C.  20426 \n \n \nRe: \nTransmission Owner Tariff Revisions of San Diego Gas & Electric Company  \nDocket No.  ER27-___-000 \n \nDear Secretary Reese: \n \nPursuant to Section 205 of the Federal Power Act (“FPA”), 16 U.S.C.  § 824d, and Part 35 \nof the Regulations of the Federal Energy Regulatory Commission (“FERC” or “Commission”), \nSan Diego Gas & Electric Company (“SDG&E”) hereby submits proposed revisions to its \nTransmission Owner Tariff (“TO Tariff”) to address concerns raised in the Order to Show Cause \nissued in Docket No.  EL26-71-000 on June 18, 2026.1  The proposed revisions expand upon \nexisting procedures in SDG&E’s TO Tariff to establish the terms and conditions applicable to \nrequests for transmission-level interconnection and transmission service by Eligible Customers on \nbehalf of Large Loads (“ECLL”)2 utilizing SDG&E-owned transmission facilities under the \noperational control of the California Independent System Operator Corporation (“CAISO”).  The \nrevisions amend Sections 3 (Definitions), 5 (Access Charges and Transmission Rates), 8 \n(Obligation to Interconnect), 9 (Expansion Process), and 10 (Interconnection Process) of the TO \nTariff, and add a pro forma Study Agreement (Appendix XIII) and a pro forma Interconnection \nAgreement (“IA”) (Appendix XIV). \n \nThe tariff revisions proposed in this filing respond to the concerns expressed in the Show \nCause Order regarding the interconnection of, and provision of service to, an ECLL.  These \n \n1  \nSee California Independent System Operator Corporation, et al., 195 FERC ¶ 61,214 (2026) (“Show \nCause Order” or “Order”). \n2  \nAmong the definition changes proposed in this filing, SDG&E proposes “Large Load” and “Eligible \nCustomer for Large Load” as new defined terms in TO Tariff Sections 3.60 and 3.25, respectively."},{"page":2,"startToken":315,"endToken":848,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 2 of 25 \n \nconcerns include the need for transparent and workable application and study procedures, \nappropriate operational requirements, a mechanism that allows for partial energization of Large \nLoads pending completion of network upgrades, and measures designed to ensure that costs \nassociated with interconnections do not create the possibility of unwarranted cost shifting to other \ntransmission customers.  The tariff revisions proposed in this Section 205 filing establish a defined \nframework under which SDG&E will receive and process requests for service from ECLLs.  Under \nthis framework, SDG&E will perform the studies necessary to identify facilities required to \naccommodate those requests, apply security provisions that protect other transmission ratepayers \nfrom the possibility of undue cost shifts, and establish other requirements associated with \ninterconnection to SDG&E-owned transmission facilities. \n \nWith respect to cost shift protection specifically, based on ongoing discussions among \nother CAISO Participating Transmission Owners (“PTOs”) and SDG&E’s understanding of other \nPTOs’ approaches for mitigating cost shifting risks, SDG&E believes its approach is substantively \naligned with that of Southern California Edison Company (“SCE”) and DesertLink, LLC (“LS \nPower”).  The SDG&E, SCE, and LS Power frameworks all require initial security tied to the cost \nof the network upgrades that the PTO determines are necessary to interconnect Eligible Customers \nrequesting interconnection service on behalf of Large Loads.  Each also provides that the PTO will \ndraw on the security in the event the Large Load ceases operation or provides an amount of \ntransmission revenues that is less than what is necessary to offset the cost of the network upgrades, \nconsidering the long-term benefits such upgrades provide to all transmission ratepayers.   \n \nIndeed, discussions between SDG&E and others in California in the months since the \nissuance of the Show Cause Order addressed a far broader range of topics than the important \nquestions concerning cost shift mitigation.  SDG&E developed its proposed tariff revisions after \nconsultation with the CAISO and the other PTOs, and in recognition of the respective and \ncomplementary responsibilities of CAISO and the PTOs for transmission service and \ninterconnections to the CAISO Controlled Grid.  Under the proposed framework, SDG&E, as the \nTransmission Owner (“TO”) under its TO Tariff, will administer the application and study process \nfor requests involving SDG&E-owned transmission facilities, while coordinating with CAISO \nwith respect to matters affecting the reliability and operation of the CAISO Controlled Grid.  This \ncoordination is necessary because ECLL interconnections may require modifications to \ntransmission facilities under CAISO operational control where such modifications are identified \nby SDG&E outside of the CAISO’s annual Transmission Planning Process (“TPP”).  Such \nmodifications also may affect the reliable operation of the broader CAISO Controlled Grid. \n \nThe proposed revisions are just and reasonable because they establish a transparent, \ndurable, and nondiscriminatory framework for processing transmission-level requests on behalf of \nnew Large Loads while addressing the reliability and cost-shifting concerns identified by the \nCommission in the Show Cause Order.  The revisions provide consistency between SDG&E’s TO \nTariff and the corresponding CAISO tariff framework while preserving the respective \nresponsibilities of SDG&E as a PTO and the CAISO as operator of the Balancing Authority Area \nin which SDG&E’s transmission facilities are located."},{"page":3,"startToken":848,"endToken":1270,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 3 of 25 \n \nSDG&E respectfully requests that the Commission accept the proposed tariff revisions as \ndescribed herein, effective February 16, 2027, and terminate the show cause proceeding in Docket \nNo.  EL26-71-000 as to SDG&E. \n \nI. \nBACKGROUND \n \nA.   \nSDG&E and Its TO Tariff \n \nSDG&E is a California public utility corporation with its principal place of business at \n8330 Century Park Court, San Diego, California 92123.  SDG&E provides electric transmission, \ndistribution, and other energy services in San Diego and Orange Counties, California, subject to \nthe respective jurisdictions of this Commission and the California Public Utilities Commission \n(“CPUC”).  SDG&E, has transferred operational control of its transmission facilities to the CAISO \nand is an Original PTO in the CAISO.  SDG&E’s transmission facilities subject to CAISO’s \nOperational Control are part of the CAISO Controlled Grid.   \n \nSDG&E’s TO Tariff sets forth SDG&E’s Transmission Revenue Requirement and the rates \nand charges for access to the CAISO Controlled Grid.  The TO Tariff also governs requests for \nphysical interconnection to the SDG&E-owned components of the CAISO Controlled Grid by \nentities eligible to request interconnection consistent with FPA section 210(a).  Interconnection of \nwholesale generation is governed by the CAISO Tariff, and interconnections requested by entities \nnot eligible under section 210(a) remain subject to the Local Regulatory Authority. \n \nB.   \nThe Show Cause Order \n \nThe Show Cause Order recognized that, in CAISO, an Eligible Customer submits an \ninterconnection application to the PTO, which performs the studies needed to interconnect new \nload, and the Eligible Customer then retains a Scheduling Coordinator to obtain transmission \nservice from CAISO.3  The Commission there found that the TO Tariffs generally do not explain \nthe details of the study processes or the technical and reliability considerations in the studies for \nrequests by Eligible Customers on behalf of large loads.  Accordingly, it directed CAISO and the \nPTOs to explain whether their tariffs remain just and reasonable without, among other things: \n \n• \na definition of large load; \n• \nan application process that accepts applications on a rolling basis, with a non-\nrefundable application fee and readiness requirements that escalate at distinct \nphases of the study process; \n• \ninformation and data requirements regarding the characteristics of the large load, \nincluding disclosure of substantially similar pending requests on behalf of the same \nlarge load; \n• \nstudy procedures that evaluate the risks presented by large load behavior, including \nsupplemental studies, and that recognize loads willing and able to limit their \nwithdrawals; \n \n3  \nShow Cause Order at pp. 19-20."},{"page":4,"startToken":1270,"endToken":1778,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 4 of 25 \n \n• \nongoing operational requirements, memorialized in pro forma agreements; and \n• \na cost recovery agreement requiring a minimum contribution toward the \ntransmission owner’s transmission revenue requirement, backed by credit support, \nwith payments and security draws credited to the transmission revenue \nrequirement. \n \nThe Commission invited CAISO and the PTOs to submit proposals in response to the Order or in \nan FPA Section 205 filing designed to address the concerns expressed in the Show Cause Order, \ntailored to their unique circumstances.  This filing is SDG&E’s proposal. \n \nII. \nPROPOSED INTERCONNECTION PROCESS REFORMS \n \nThe Show Cause Order identifies concern with the lack of “clear and consistent” tariff \nprovisions governing requests for service by Eligible Customers on behalf of large loads.  SDG&E \naddresses this concern directly through the development of new and enhanced procedures \ngoverning service requests by Eligible Customers under the TO Tariff.  SDG&E’s proposed tariff \nrevisions do not ask the Commission or stakeholders to learn entirely new vocabulary.  Instead, \nSDG&E’s framework borrows the familiar architecture of generator interconnection, which the \nCommission and market participants already understand well and that has been found to be just \nand reasonable, and applies it to Eligible Customers requesting service on behalf of large loads.  \nElements of SDG&E’s proposed framework include: (1) an application process featuring a time-\nstamped queue, a scoping meeting, and a Site Control requirement including allowance for \ndeposits in lieu of Site Control; (2) sequential study phases with defined timelines and deposits, \nand a single amendment right; and, (3) pro forma interconnection agreement with milestones, \noptions for limited operation pending completion of upgrades, financial security and possible \nwithdrawals, and queue forfeiture upon default. \n \nThe proposed framework also reflects the complementary roles of SDG&E as a PTO and \nthe CAISO.  SDG&E owns the relevant transmission facilities and will administer the \ninterconnection process established under its TO Tariff.  The CAISO operates the CAISO \nControlled Grid and is vested with responsibility for matters assigned to it under the Transmission \nControl Agreement and the CAISO Tariff.  For instance, interconnection service under the TO \nTariff is not the same thing as and does not supplant transmission service governed by CAISO’s \ntariff; rather, the interconnection customer requesting transmission service over the CAISO \nControlled Grid must take such service from CAISO through a Scheduling Coordinator.  \nSDG&E’s proposed pro forma Interconnection Agreement confirms this point (Article 4.3).  \nAdditionally, the proposed procedures provide for coordination between SDG&E and the CAISO \nwhere necessary to secure the CAISO’s concurrence that the transmission upgrades identified by \nSDG&E through its study process are not duplicative of transmission upgrades the CAISO has \nidentified through its annual TPP, and that the upgrades and operational requirements identified \nby SDG&E through its study process are consistent with safe and reliable operation of the CAISO \nControlled Grid (pro forma IA, Article 5.5.2). \n \nImportantly, the proposed revisions are limited to matters properly addressed through \nSDG&E’s Commission-jurisdictional TO Tariff.  They do not alter the respective federal and state"},{"page":5,"startToken":1778,"endToken":2339,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 5 of 25 \n \njurisdictional responsibilities applicable to retail electric service.  Nor do they change the class of \ncustomers eligible to receive Commission-jurisdictional transmission service under SDG&E’s TO \nTariff.  Rather, the revisions establish the procedures and requirements applicable when an Eligible \nCustomer seeks to interconnect its facilities with SDG&E-owned transmission from SDG&E as a \nTO in order for it – the Eligible Customer – to serve the Large Load directly.  Indeed, while the \nreforms proposed here are motivated by SDG&E’s desire to address points in the Show Cause \nOrder regarding Eligible Customers requesting service on behalf of large loads, many of the \nreforms proposed herein will be broadly applicable to other categories of Eligible Customer service \nrequests under SDG&E’s TO Tariff.   \n \nA. \nDefinition of Large Load \n \nThe Show Cause Order at P 57 states that CAISO and PTO tariffs “lack a definition of \nlarge load, as a new category of load[,]” and suggests that “[a]n appropriate definition, including \na load size and interconnection voltage threshold, should be based on the characteristics of \nCAISO’s transmission system.”  The Show Cause Order suggests that a reasonable definition \nwould be “a new commercial or industrial customer, located at a single site behind one or more \npoints of interconnection, and that has a peak load of 50 MW or greater, interconnects to the \ntransmission system at a voltage level of greater than 69 kV, and is not part of a co-location \narrangement.”  Rather than adopt the Show Cause Order’s definition, SDG&E proposes to include \nthe following definition of “Large Load” in its TO Tariff: “a new customer, located at a single site \nbehind one or more points of interconnection to the CAISO Controlled Grid, and that has a peak \nload of 50 MW or greater.”4   \n \nSDG&E’s proposed definition differs from the definition in the Show Cause Order in three \nrespects.  First, in SDG&E’s view, the Show Cause Order’s call out to “commercial and industrial \ncustomers” is not necessary because, as a practical matter, SDG&E expects that loads of 50 MW \nor greater will likely fall into these two general categories of customers.  Second, SDG&E believes \nthat the express call-out to the CAISO Controlled Grid in its definition is preferable to the general \nreference to the “transmission system” in the Show Cause Order definition.  This call-out is \nnecessary because some sub-transmission facilities within the CAISO Balancing Authority Area \nare operated at voltages greater than 69 kV but are not part of the CAISO Controlled Grid, while \ncertain of SDG&E’s transmission facilities that are part of the CAISO Controlled Grid operate at \n69 kV.  Thus, the Show Cause Order definition is both over- and under-inclusive relative to \nSDG&E’s proposed definition.  Finally, SDG&E’s proposed definition does not exclude Large \nLoads that may be co-located with generation.  In SDG&E’s view, such an exclusion could limit \nthe ratepayer protections that are a key feature of SDG&E’s proposed framework. \n \nB. \nApplication Process \n \nThe Show Cause Order at P 58 states that CAISO and PTO tariffs “lack sufficiently clear \nand consistent provisions establishing the application process and study procedures that will be \nused when CAISO and/or the Participating Transmission Owners evaluate the provision of \n \n4  \nSDG&E has added its proposed definition in Section 3.60 of the TO Tariff."},{"page":6,"startToken":2339,"endToken":2853,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 6 of 25 \n \ntransmission service to Eligible Customers on behalf of large loads.”  The Show Cause Order \nidentifies a rolling application process, non-refundable application fee and escalating readiness \nrequirements, and requirements to provide to the PTO and/or CAISO regarding the large load as \nelements the Commission believes should be reflected in the CAISO and PTO tariffs. \n \nDiscussed in the following subsections are SDG&E’s proposed tariff revisions to address \nthese concerns. \n \n1. \nIntake and Initiating the Study Process \n \nSection 10 of SDG&E’s TO Tariff already includes an application process and study \nprocedures for Eligible Customer service requests.  In this filing, SDG&E proposes substantial \nreforms to this existing framework, including through the following modifications: \n \n• \nRolling applications.  The existing TO Tariff interconnection process is serial in nature \nand does not include any “windows” during which applications must be submitted.  \nAccordingly, SDG&E already accepts applications at any time on a rolling basis.  To \naddress the Commission’s suggestion regarding the need for an application process that \naccepts applications on a rolling basis, SDG&E proposes to maintain its current serial study \nprocess that accepts and studies each application at any time on a rolling basis, with priority \nbased on the date SDG&E, as the PTO, receives the application.  SDG&E has modified \nSection 10.2 of the TO Tariff to state clearly that applications shall be accepted on a rolling \nbasis.  As part of its framework to deter speculative or duplicative requests discussed in the \nReadiness Requirements section below, SDG&E proposes a $50,000 non-refundable \napplication fee, also in Section 10.2. \n• \nScoping Meeting.  SDG&E has added language to Section 10.3 of the TO Tariff \nestablishing a Scoping Meeting that may occur following receipt of the application fee but \nbefore commencement of the System Impact Study.  The Scoping Meeting is proposed to \noccur at the request of either SDG&E or the Interconnection Customer for the purpose of \ndiscussing interconnection options and refining information and models. \n• \nSingle pro forma Study Agreement.  SDG&E proposes a pro forma Study Agreement \nthat is referenced in and attached to its TO Tariff (Appendix XIII).  The Study Agreement \nestablishes the terms and conditions applicable to the System Impact Study and, as \napplicable, subsequent Facilities and Electromagnetic Transient (“EMT”) Studies.  In \nparticular, the Study Agreement treats sixty (60) calendar days as the default good faith \nestimate for each of the System Impact and Facilities Studies.  Appendix XIII, Section 8.0. \nThe use of a single pro forma Study Agreement streamlines the study process by \neliminating the need to separately tender, negotiate, and execute a new agreement between \nstudy phases, thereby reducing administrative delays and facilitating more timely \nprogression of the required studies.  In addition, assuming Commission acceptance of the \npro forma Study Agreement, execution of conforming Study Agreements would not \nrequire individual filings with, and acceptance by, the Commission.  This will allow the \napplicable study to proceed without the need for specific Commission action, thereby \nreducing potential delays for customers.  After providing the required notice and study"},{"page":7,"startToken":2853,"endToken":3334,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 7 of 25 \n \ndeposit, an applicant may immediately proceed to the next applicable study phase under \nthe existing Study Agreement. \nAdditional details concerning the study process itself are set forth below.   \n \n2. \nReadiness Requirements \n \nTo deter speculative or duplicative requests and ensure that projects progressing through \nthe study process continue to demonstrate readiness, SDG&E proposes a readiness framework that \nincludes both upfront financial commitments and ongoing project-development milestones.  \nSpecifically, SDG&E proposes a $50,000 non-refundable application fee, an initial $100,000 \ndeposit for the System Impact Study, an additional $100,000 deposit if the applicant elects to \nproceed with a Facilities Study, and an additional $200,000 study deposit if SDG&E determines \nthat an EMT Study is required.5  Each study deposit will be applied toward the actual cost of the \napplicable study and will be subject to reconciliation in accordance with the Study Agreement. \n \nSDG&E would also require an ECLL applicant to identify a definitive Point of \nInterconnection to the CAISO Controlled Grid.  In addition, the proposed TO Tariff revisions \ninclude provisions governing an applicant’s demonstration of Site Control, including a limited \nopportunity to provide documentation and a deposit in lieu of such demonstration, which will \nexpire within 180 Calendar Days of the effective date of its Interconnection Agreement.  SDG&E \nhas reflected these modifications in proposed Sections 10.5 and 10.6 of the TO Tariff. \n \nIn addition to these requirements, SDG&E proposes time-bound readiness milestones \nthroughout the study and interconnection process to help ensure that interconnection requests do \nnot remain in the queue indefinitely without demonstrating continued progress: \n \n• \nElection to proceed to the Facilities Study.  After the System Impact Study, an applicant \nmust request initiation of the Facilities Study and provide the required deposit; otherwise, \nits application is deemed withdrawn (TO Tariff Sections 10.12.1, 10.13). \n• \nInterconnection Agreement execution.  Following tender of an Interconnection \nAgreement, the ECLL applicant would have thirty (30) days to either execute the \nInterconnection Agreement or request that SDG&E file an unexecuted Interconnection \nAgreement with the Commission.  If the ECLL applicant does neither within the 30-day \nperiod, its interconnection application would be deemed withdrawn, and the applicant \nwould be responsible for reimbursing SDG&E for all costs reasonably incurred to process \nthe application that are not otherwise covered by the Study Agreement (TO Tariff Section \n8.1.5).  As with the proposed pro forma Study Agreement, the proposal to include a form \nInterconnection Agreement in SDG&E’s TO Tariff is intended as an over-arching process \nimprovement, such that the execution of conforming Interconnection Agreements would \nnot require individual filings with, and acceptance by, the Commission.  This will allow \n \n5  \nThe application fee can be found in the TO Tariff, Section 10.5.  Study amounts are set forth in the \nStudy Agreement, TO Tariff Appendix XIII, Section 8.0."},{"page":8,"startToken":3334,"endToken":3816,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 8 of 25 \n \nthe satisfaction of early milestones to proceed without the need for specific Commission \naction, thereby reducing potential delays for customers and providing the most “shovel-\nready” projects with speed to power for the service requested.   \n• \nLimited amendments.  SDG&E proposes to clarify the types of modifications that may \nbe made through the existing one-amendment allowance for a Completed Interconnection \nApplication.  Permitted modifications include reductions in interconnection service \ncapacity, certain changes to project technical parameters or interconnection configuration, \nand modifications to the proposed in-service date or Commercial Operation Date, subject \nto the conditions specified in the proposed TO Tariff.  The proposed revisions also establish \nthe timeframe for submitting such an amendment and clarify the applicant’s responsibility \nfor any additional study costs resulting from the amendment, including costs associated \nwith revisions to studies for later-queued applicants (TO Tariff Section 10.7). \n• \nSecurity posting.  If the ECLL applicant executes the pro forma Interconnection \nAgreement, the applicant would be required to post the financial security required under \nthe Interconnection Agreement by the applicable deadline specified therein.  Failure to \ntimely post the required financial security, or any other default under the Interconnection \nAgreement, would result in forfeiture of the applicant’s queue position and withdrawal of \nits interconnection request (TO Tariff Section 10.23). \nTogether, these requirements establish clear and enforceable readiness milestones that escalate at \ndistinct phases, as the Commission described, and are intended to maintain an actionable queue, \nminimize speculative interconnection requests, and prevent inactive applicants from continuing to \nhold queue positions. \n \nFinally, SDG&E also views the cost responsibility framework, including cost shift \nprotections discussed in greater detail below, as critical elements of its proposed readiness \napproach.  In summary, SDG&E’s proposed 100 percent cost-shift protection for network \nupgrades6 (TO Tariff Sections 8.1.2 and 8.1.3 and pro forma IA Articles 11.3, 11.5, and 11.6) and \nadvance funding requirement for Direct Assignment Facilities (TO Tariff Section 8.1.2 and pro \nforma IA Articles 5.10 and 11.2) establish clear financial responsibility for interconnection-related \ninfrastructure costs at the outset of the interconnection process.  Providing ECLL applicants with \ncertainty as to their funding requirements, and the amount and duration of security obligations, \nshould help ensure that interconnection requests enter and remain in the queue only where the \napplicant has determined that such funding and security do not jeopardize the commercial viability \nof their planned projects. \n \n3. \nInformation and Data Requirements \n \n \nAfter recognizing that “CAISO and/or the Participating Transmission Owners may have \nexisting load integration processes[,]” the Show Cause Order at P 49 expressed:  \n \n6  \nThe proposed Interconnection Agreement uses the term “Network Upgrades,” which is synonymous \nwith the TO Tariff’s pre-existing definition of “Reliability Upgrades.”  See Section 3.93 of the proposed \nTO Tariff; pro forma IA Article 1 (defining Network Upgrades as synonymous with Reliability \nUpgrades)."},{"page":9,"startToken":3816,"endToken":4292,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 9 of 25 \n \n \nconcern[] that those processes and any required studies … are not described in their \ntariffs with the degree of clarity and specificity necessary to … mitigate operational \nrisks…, avoid disputes regarding how studies are conducted, deter speculative or \nduplicative requests…, and help avoid excessive and unnecessary network \nupgrades. \n \nIn the months since the issuance of the Show Cause Order, SDG&E has been working in \nconjunction with CAISO, SCE, Pacific Gas and Electric Company (“PG&E”), and other \nstakeholders in the Large Load Technical Requirement Working Group (“LLTRWG”) to develop \nadditional technical requirements to be considered in the study process.  Holistically, these \nadditional requirements address technical aspects of the ECLL interconnection process and address \nthe Commission’s concerns.   \n \nSDG&E proposes to modify its TO Tariff to require the ECLL to submit to SDG&E, as \nthe PTO, data that the LLTRWG recommends be made available for study and operational \npurposes.  These data include: large load operating characteristics; hourly load profile; ramping \nbehavior; power quality; and telemetry and communications data.  Specifically, an ECLL must \nsubmit the data specified in the System Impact Study Data Template Submittal Form, including \nfacility characteristics, load composition and expected hourly operating profile, MW capacity, \nminimum and maximum operating levels, electrical and dynamic model data, voltage and \nfrequency ride-through characteristics, protection and control settings, load reconnection behavior, \nexpected CAISO market participation model, curtailment and ramping capabilities, and behind-\nthe-meter generation capacity and characteristics, and must complete CAISO’s Large Load \nTechnical Data Request.  An ECLL must also disclose whether substantially similar \ninterconnection requests on behalf of the same Large Load have been submitted and whether it is \nrequesting Flexible Interim Load Interconnection (“FILI”) Service.   \n \nSDG&E has added these data requirements in Section 10.5 of the TO Tariff and \nAttachment B to the pro forma Study Agreement. \n \nC. \nTransmission Service Study \n \nThe Show Cause Order notes at P 49 that CAISO and PTO tariffs “do not contain \nprovisions addressing with sufficient clarity and consistency how CAISO and/or the Participating \nTransmission Owners will study the provision of transmission service to Eligible Customers on \nbehalf of large loads,” and expresses concern at P 51 that “CAISO’s Tariff and/or the TO Tariffs \nmay not clearly specify which entity will be responsible for studying the provision of transmission \nservice to Eligible Customers on behalf of large loads.”  Later, in paragraph 62 of the Show Cause \nOrder, the Commission discusses the need for study processes, and clarity about such processes, \nthat include “a report to the Eligible Customer with the results of the studies” that identify “any \nDirect Assignment Facilities and network upgrades necessary to accommodate the transmission \nservice request as well as a non-binding good-faith estimate of the cost and the time to construct \nsuch facilities.”  The study should “recognize … the unique operational characteristics of large"},{"page":10,"startToken":4292,"endToken":4863,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 10 of 25 \n \nloads” and, the Show Cause Order suggests, should have “a study deadline of no more than 60-90 \ncalendar days.”  Id. \n \nIn response to the Show Cause Order’s concerns, SDG&E clarifies first that with respect \nto requests by an Eligible Customer to interconnect a new project, SDG&E’s TO Tariff already \noutlines the process for both the System Impact Study and the Facilities Study.  Under the existing \nTO Tariff, for instance, “[t]he System Impact Study will identify whether any Direct Assignment \nFacilities or Reliability Upgrades as well as, if applicable, any Delivery Upgrades are necessary to \ndeliver a New Facility’s full output over the ISO Controlled Grid.”7  This study process is already \navailable for wholesale load interconnection requests by Eligible Customers.  This includes ECLL, \nwhether or not a newly-created sub-category of wholesale load called ECLL is created. \n \nIn this filing, however, SDG&E proposes revisions to create a new category of Eligible \nCustomer called ECLL.  These revisions make abundantly clear that the existing System Impact \nStudy and Facilities Study processes apply to the newly-created ECLL customer type, as a new \ncategory of wholesale load service requested on behalf of a large load, and in recognition of the \nunique technical issues large loads entail, to add an EMT Study where needed.  Thus, for purposes \nof clarity and consistency, SDG&E declares that as the TO, it will, pursuant to the provisions of \nits TO Tariff, conduct the study process that will identify the operating procedures, Direct \nAssignment Facilities, and network upgrades necessary to provide transmission service to an \nECLL.  Moreover, while not raised in the Show Cause Order, SDG&E commits that it will use the \nsame due diligence in completing studies for others as it uses for itself or its affiliates.  The study \nprocess modifications described here are in in Sections 10.9 through 10.17 of the proposed TO \nTariff.  Accordingly, SDG&E’s proposed revisions address the Show Cause Order’s concern that \nstudies should identify Direct Assignment Facilities as well as network upgrades required to safely \nand reliably interconnect the ECLL is satisfied. \n \nWith respect to the unique operational characteristics of large loads, the Show Cause Order \nat P 63 states that existing “tariffs do not require transmission owners to install, and transmission \ncustomers to pay for, equipment to enable CAISO to monitor large loads for impacts of, for \nexample, fast-ramping load that may impact the transmission system too quickly to be captured by \nconventional data acquisition systems (e.g., the need for phasor measurement units or similar \nequipment).”  That same paragraph further observes that the PTO tariffs “do not specify ramp rate \nor ride-through requirements with which the transmission customer taking transmission service on \nbehalf of the large load must comply” and do “not specify requirements for necessary control \ntechnologies and/or protection systems that may be necessary to limit transmission customer’s \nwithdrawals from the transmission system as appropriate.” \n \nIn response, SDG&E states that it proposes to incorporate the unique operational \ncharacteristics of Large Loads by implementing the recommendations of the LLTRWG discussed \nabove.  In addition, SDG&E notes that at the time of this writing, the LLTRWG initiative has \nalready identified CAISO data monitoring requirements (including Phasor Measurement Units \n \n7  \nSee redlined version of the TO Tariff section entitled “System Impact Study Procedures,” proposed by \nthis filing to be re-numbered as Section 10.12."},{"page":11,"startToken":4863,"endToken":5402,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 11 of 25 \n \n(“PMUs”)), ramp rate and ride-through requirements, and necessary control technologies and \nprotection systems.  SDG&E proposes to incorporate these requirements into its process in several \nways.  First, SDG&E will require that the ECLL submitting an interconnection application provide \noperating characteristics; ramping behavior; and measures to ensure the Large Load does not \ncreate, or exacerbate, power quality issues on SDG&E’s transmission facilities.  SDG&E has \nadded this as an application requirement in Section 10.5 of the proposed TO Tariff.   Second, these \nrequirements are captured in the study process in Attachment B of the pro forma Study Agreement \n(Appendix XIII). In particular, the EMT Study scope of work in the Study Agreement covers \nmodel verification, standalone and integrated simulation, voltage ride-through and load-recovery \nperformance, control interactions, sensitivities, and protection and load-tripping response.  Finally, \nSDG&E also proposes that all data and monitoring requirements related to the LLTRWG be \ninstalled and maintained by the ECLL, as outlined in sections 8.2, 9.6, 9.7.3, 9.7.4, and 9.7.5 of \nSDG&E’s proposed pro forma Interconnection Agreement (Appendix XIV). \n \n \nSDG&E shares the Show Cause Order’s preference for expeditious processing of \ninterconnection requests, as evidenced by the Show Cause Order’s suggestion of a 60-90 study \nprocess to identify Direct Assignment Facilities and network upgrades and provide non-binding \nestimates of cost and time to construct.8  The sooner an Eligible Customer receives its study results, \nthe sooner it will be in position to make the business decision regarding whether to make the further \nfinancial commitments necessary to advance its request further through the process.   \n \n \nAt the same time, however, a step-by-step study process permits a customer to make a \ndecision that best suits its business at each step.  For instance, based on the results of the System \nImpact Study, a customer may or may not wish to proceed to a Facilities Study; SDG&E’s \nframework affords that customer with a reasonable amount of time to decide whether to move to \nthe next step.9  SDG&E’s approach of utilizing a single Study Agreement to perform multiple \nstudies in phases appropriately balances the interests in expedition and business flexibility. \n \nD. \nStakeholder Access to Information on Large Load Interconnections \n \nThe Show Cause Order expresses at P 70 concern about a lack of transparency regarding \nthe “transmission service provided to Eligible Customers on behalf of large loads, for network \nupgrades evaluated in the local transmission planning process that are needed to accommodate \ntransmission service to Eligible Customers on behalf of those large loads, and the costs for those \nnetwork upgrades.”  In P 75, the Show Cause Order further states that CAISO and the PTOs should \npost and update data detailing: (1) aggregate amounts of proposed large load additions, including \nin each transmission pricing zone; (2) network upgrades planned to accommodate transmission \nservice for Eligible Customers on behalf of large loads, identified by equipment type; and (3) cost \nestimates for such network upgrades.  Concluding, the Show Cause Order found that CAISO and \nthe PTOs should “consider what other data related to transmission costs resulting from the \n \n8  \nShow Cause Order at p. 62. \n9  \nTO Tariff Section 10.13."},{"page":12,"startToken":5402,"endToken":5761,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 12 of 25 \n \nprovision of transmission service to Eligible Customers on behalf of large loads would be useful \nto include on CAISO’s website.” Id. \n \nIn response, SDG&E has been working with CAISO and the other PTOs to determine \nappropriate data that can be posted publicly.  CAISO already publishes in its TPP documentation \nthose network upgrades that the CAISO has determined, through its concurrence process with the \nPTOs, are needed to accommodate ECLL interconnections.  Further, CAISO proposes to publicly \npost:10 \n \n• aggregate amounts of proposed large load additions behind interconnections of Eligible \nCustomers to the ISO Controlled Grid, including the aggregate amounts in each \ntransmission pricing zone; \n• planned network upgrades needed to accommodate the ECLL taking transmission service, \nidentified by type of equipment and network upgrade (e.g., new substation, reconductoring, \na new high-voltage transmission line) for each transmission service request; and \n• cost estimates for each planned network upgrade identified as needed for the ECLL. \nFor details on the implementation of these information postings, SDG&E refers to CAISO’s \nSection 205 filing in response to the Show Cause Order. \n \nE. \nCost Shifting Among Transmission Customers \n \nThe Show Cause Order states at P 76 that CAISO and PTO tariffs “lack adequate \nmechanisms to mitigate the risk of cost shifting among transmission customers, which may result \nin unjust and unreasonable rates for transmission service” and expresses concern regarding “the \napparent lack of a pro forma cost recovery agreement between CAISO, the relevant transmission \nowner, and the Eligible Customer taking transmission service on behalf of large loads.”  SDG&E \nproposes addressing these concerns with a framework that provides comprehensive cost shift \nprotection, as discussed below. \n \n1. \nAdvance Funding and Security \n \nAdvance funding and security are the cornerstone features of SDG&E’s proposed \nframework for ensuring that transmission customers are not called upon to shoulder costs of \nfacilities built to accommodate Eligible Customers requesting service on behalf of large loads.  \nSDG&E proposes that the ECLL has cost responsibility for its Interconnection Facilities, provide \n \n10 See generally CAISO, Large Load Enhancements Draft Final Proposal (Sept.  24, 2026), \nhttps://stakeholdercenter.caiso.com/InitiativeDocuments/Draft-Final-Proposal-Large-Load-\nEnhancements-Sep-24-26.pdf."},{"page":13,"startToken":5761,"endToken":6227,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 13 of 25 \n \nadvance funding for required Direct Assignment Facilities, and post security for required network \nupgrades.11 \n \nThe advance funding provides assurance that, should the Large Load not reach its \nCommercial Operation Date (“COD”), transmission ratepayers will not have incurred any \nobligations for the costs of Direct Assignment Facilities.  Likewise, the security provisions ensure \nthat transmission ratepayers are held harmless from the network upgrades’ projected revenue \nrequirements in the event the Large Load does not reach COD, or in the event that the transmission \nrevenues provided by the Large Load after COD fall short of what would be required to offset the \nnetwork upgrades’ projected revenue requirements.  For high voltage network upgrades (200 kV \nand above), this approach is designed to eliminate the possibility of cost shifting from the ECLL \nto other transmission ratepayers within the same and different Transmission Access Charge \n(“TAC”) areas.  Similarly, for low voltage network upgrades (below 200 kV), this approach is \ndesigned to eliminate the possibility of cost shifting from the ECLL to other transmission \nratepayers within the same TAC area. \n \n2. \nSecurity Amount, Term, and Draws \n \nSDG&E’s proposed security requirement will protect ratepayers from the risk that \ntransmission revenues provided by an ECLL could be less than the projected revenue requirements \nassociated with the network upgrades that are necessary to interconnect the ECLL.  The Eligible \nCustomer will provide SDG&E, as the PTO, security equal to the present value of the forecast \nlifecycle revenue requirement associated with the network upgrades, including both capital and \nO&M-related costs, calculated using SDG&E’s most recent FERC-authorized weighted cost of \ncapital.  SDG&E believes this approach provides full transmission ratepayer protection and \neliminates ambiguity. \n \nSDG&E also proposes that the Eligible Customer maintain security for a period of time \nbeginning with the ECLL’s authorization for SDG&E to begin construction of the network \nupgrades and ending ten years following the COD of the required network upgrades.  The \nminimum annual transmission revenues would be set in advance, at the ECLL’s option either \nescalated at the rate of inflation or levelized, such that their present value equals the present value \nof the forecast lifecycle revenue requirement.  At any time during the term of the security, the then-\navailable security is therefore sufficient, on a present value basis, to cover any difference between \n(i) the forecast lifecycle revenue requirement associated with the network upgrades, and (ii) the \nsum of all draws on the security plus the sum of the ECLL’s actual “Deemed Transmission \n \n11  See pro forma IA, Articles 5.10, 11.2, and 11.5(ii)(a) (cost responsibility for Interconnection \nCustomer’s Interconnection Facilities and advance funding for Transmission Owner’s Interconnection \nFacilities and Distribution Upgrades) and Article 11.5(ii)(b) (security for network upgrades)."},{"page":14,"startToken":6227,"endToken":6749,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 14 of 25 \n \nRevenues.”12  These terms are specified in the proposed pro forma Interconnection Agreement, \nAppendix XIV to the TO Tariff.13 \n \nOnce the ECLL-required upgrades reach COD, the required security would decline over \ntime as the ECLL generates “Deemed Transmission Revenues.” Deemed transmission revenues \nwill be calculated as the product of the applicable high voltage or low voltage TAC rate and the \nECLL’s metered energy withdrawals from the transmission grid.14  To the extent actual Deemed \nTransmission Revenues in a given year are less than the minimum amount for that year, SDG&E, \nas the PTO, will draw the shortfall on the posted security.  As discussed below, the amount of such \ndraws will be recorded in SDG&E’s Transmission Revenue Balancing Account Adjustment \n(“TRBAA”) as a credit which will reduce TAC rates.15 \n \nIn the event the ECLL becomes aware that it or the Large Load it intends to serve will fail \nto reach COD, or will cease operation after COD, the ECLL will be required to promptly notify \nSDG&E, and SDG&E will draw all remaining security (effectively, an “exit fee”).  Accordingly, \nthe security functions as a financial backstop, ensuring that the ECLL provides revenues on a \npresent value basis (Deemed Transmission Revenues plus any draws on security) that are at least \nequal to the forecast present value revenue requirement of the network upgrades.  If the ECLL \ncontinues operations after the end of the security term, the transmission revenues provided by the \nECLL will act to reduce transmission ratepayer costs, since the revenue requirements associated \nwith the upgrades would already have been fully offset. \n \nFinally, SDG&E notes that this proposal could result in security requirements that turn out \nto be more than is required to cover the actual lifetime revenue requirements of the network \nupgrades.  This is because the security requirement is established in advance using forecasts of \nconstruction costs, operation and maintenance costs, inflation, and other factors such as authorized \nreturn that determine a facility’s actual revenue requirement.  However, it is SDG&E’s judgment \nthat the commercial certainty and administrative simplicity of using forecast values offsets the risk \nthat the Eligible Customer will have posted more security than turns out to be necessary during the \nterm of the security.   \n \n \n \n \n12  The term “Deemed Transmission Revenues” is defined in Article 11.6.2 of the proposed pro forma \nInterconnection Agreement. \n13  See generally pro forma IA Articles 11.5 and 11.6 and Appendix H. \n14  This security mechanism assumes the ECLL proposes that the Large Load be radially connected to \nSDG&E’s facilities and that the ECLL will thereby pay the applicable CAISO TAC for all grid \nwithdrawals at the Point of Interconnection to the CAISO Controlled Grid.  Metering at the point of \ninterconnection would then be used to compute actual Deemed Transmission Revenues.  If the ECLL \ndoes not propose a radial connection, the ECLL and SDG&E will need to agree on a metering \narrangement that will allow SDG&E to compute actual Deemed Transmission Revenues. \n15  See TO Tariff Sections 3.114 and 8.1.3."},{"page":15,"startToken":6749,"endToken":7284,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 15 of 25 \n \n \n \n3. \nPro Forma Agreement \n \nThe Show Cause Order, at P 64, states that the CAISO and PTO tariffs “lack pro forma \nprovisions in a transmission service agreement, or other applicable agreement, between CAISO \nand/or the Participating Transmission Owner and the transmission customer taking transmission \nservice on behalf of a large load to memorialize the above terms (e.g., equipment requirements, \ndata requirements, remote disconnect capability).”  SDG&E agrees that a pro forma agreement \ndoes not currently exist in the context of an ECLL taking transmission service.   \n \nThe absence of a pro forma agreement, however, does not mean that no structure exists.  \nAn Interconnection Agreement is the instrument through which the TO Tariff already assigns \nupgrade costs.  It is executed by the party that causes the upgrades and filed with the Commission \nwhen required.  While SDG&E, until now, has not had a pro forma Interconnection Agreement as \npart of its TO Tariff, SDG&E has an executed Interconnection Agreement under the TO Tariff on \nfile with the Commission.  That Interconnection Agreement relied upon the Commission’s pro \nforma Large Generator Interconnection Agreement (“LGIA”) as “a useful starting point…with \n[appropriate] modifications….”16  SDG&E believes it can be “a useful starting point” in this \ncontext too.  Accordingly, SDG&E proposes to implement contractual terms through a pro forma \nInterconnection Agreement, based on the Commission’s pro forma LGIA.  SDG&E proposes this \nas a bilateral agreement between SDG&E and the Eligible Customer, rather than a separate two- \nor three-party cost recovery agreement.   \n \nSDG&E’s proposed agreement would apply to all third-party Eligible Customer requests \nto interconnect a Project (other than generation, which will remain subject to CAISO’s Tariff) to \nSDG&E’s transmission facilities.  The proposed pro forma Interconnection Agreement \nmemorializes a broad range of financial terms, such as establishing in contract the financial \nsecurity necessary to implement SDG&E’s proposed protections against cost shifting,17 as well as \na wide range of technical terms.  Regarding the latter specifically, the proposed pro forma \nInterconnection Agreement includes terms addressing, among other things: continuous dynamic \ndisturbance recording and PMU and digital fault recording capability (Article 8.2); a power factor \nrange of 0.97 lagging to 0.99 leading (Article 9.6.1); compliance with CAISO Tariff voltage, \nreactive power, and ride-through requirements applicable to Large Loads (Articles 9.6.2.1, 9.7.3); \npost-fault active power recovery (Article 9.7.4); ramp-rate limitations (Article 9.7.5); telemetry \nand metering (Articles 7 and 8); SDG&E’s rights to interrupt, reduce, or disconnect service \n(Articles 9.7.2 and 13.5.2); and updated data submissions with restudy if as-built data differ \nmaterially from the data used in the study process (Article 24.3).  Once interconnected, the delivery \nof energy over the transmission system to the ECLL will be governed by the CAISO Tariff just \nlike other wholesale load in CAISO.   \n \n \n \n \n16  See SDG&E’s Transmittal Letter of Interconnection Agreement with NextEra Energy Transmission \nWest, LLC at p. 2, filed Dec.  11, 2018, in Docket No.  ER19-530. \n17  See generally TO Tariff Appendix XIV, the pro forma Interconnection Agreement, at Article 11.5 and \nAppendix H."},{"page":16,"startToken":7284,"endToken":7759,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 16 of 25 \n \n \n \n4. \nMinimum Contribution \n \n \nThe Show Cause Order at P 82 draws a connection between the minimum revenue \ncontribution an ECLL should be expected to make and the level of jurisdictional transmission \nservice the ECLL has requested.  This, in turn, depends on how the requested service is studied \nand “any necessary network upgrades that must be developed to provide the requested transmission \nservice.”  Id.  SDG&E agrees.   \n \nThe upgrades necessary to provide transmission service to the interconnecting ECLL will \nbe identified in the interconnection study conducted by SDG&E as the PTO, which will be based \non the amount of power that the ECLL may withdraw from the CAISO Controlled Grid.  Under \nSDG&E’s proposal, the ECLL is required to provide advance funding for Direct Assignment \nFacilities and, for Reliability Upgrades, an initial amount of security that, on a present value basis, \nis equal to their forecast lifecycle revenue requirements.  This advance funding and initial amount \nof security constitutes the “minimum contribution” and must be provided by the ECLL prior to \ntaking transmission service.18 \n \nBecause the minimum annual revenues may be escalated or levelized, the mechanism also \naccounts for “potential timing differences between when costs are incurred to develop needed \nnetwork upgrades and the pace at which the large load ramps toward energizing at its full level of \nrequested service.” Show Cause Order at P 82.  SDG&E has proposed modifications in Section \n8.1.2 of the TO Tariff to formalize this. \n \n \n \n5. \nSpeculative Requests \n \nThe Show Cause Order expresses concern at P 83 that: \n \ncost shifting may occur through the recovery of the Participating Transmission \nOwners’ transmission revenue requirement through the Access Charge due to \nspeculative requests to accommodate transmission service to serve large loads, i.e., \nwhere large loads do not materialize or where the MW quantity of such large loads \nis lower than proposed, or because of the study process used to evaluate the \nfacilities needed, and the associated costs, to accommodate the provision of \ntransmission service to Eligible Customers on behalf of large loads. \n \nSDG&E shares this concern.  Toward that end, SDG&E notes that its proposed tariff \nreforms are designed to address it through a readiness framework that includes both upfront and \nincreasing financial commitments19 and ongoing project-development milestones.  SDG&E’s \nproposal for the Eligible Customer to provide advance funding for Direct Assignment Facilities \nand to post an initial amount of security equal, on a present value basis, to the forecast lifecycle \n \n18  The “minimum contribution” for the Interconnection Customer’s Interconnection Facilities is set forth \nin Article 5.10 of the pro forma IA; for the Transmission Owner’s Interconnection Facilities, in Article \n11.2; and for Reliability Upgrades, in Article 11.5(ii). \n19  E.g., pro forma IA Articles 5.5.5 and 5.6.5."},{"page":17,"startToken":7759,"endToken":8196,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 17 of 25 \n \nrevenue requirement of all network upgrade-related costs, sufficiently addresses the scenario \nwhere the Large Load does not materialize or provides actual Deemed Transmission Revenues at \na level that is less than what is needed to offset the revenue requirements associated with the \nnetwork upgrades.20   \n \nIn this way, failure of the Large Load to reach its COD will not burden transmission \nratepayers with the costs of under-utilized transmission.  Indeed, the fact that such robust \nprotection for other transmission customers exists should itself provide a deterrent to potential \napplications for speculative or questionable projects, the economics of which might otherwise have \ndepended upon offloading a project’s risk onto other customers.   \n \n \n \n6. \nCrediting of Payments \n \nThe Show Cause Order clarifies at P 84 the Commission’s expectation that “any payments \nmade by an Eligible Customer to a transmission owner pursuant to such a cost recovery agreement \n… will be appropriately credited toward transmission owners’ transmission revenue requirements \nconsistent with the Commission’s cost-of-service regulations.”  SDG&E agrees that any draws on \nthe security provided by the Eligible Customer will reduce the network upgrade costs that \ntransmission ratepayers would otherwise be required to pay.  All draws on the security will be \nrecorded in the TRBAA as a credit against the applicable high voltage or low voltage transmission \nrevenue requirements, and are included in the definition of Transmission Revenue Credit.  SDG&E \nhas added these modifications in Sections 3.114 and 8.1.3 of the proposed TO Tariff. \n \n7. \nPTO As Eligible Customer \n \nWhere SDG&E itself is the entity serving a Large Load at retail, it is neither necessary nor \npractical for SDG&E to post security to itself.  Accordingly, Section 8.1.4 reflects a comparability \ncommitment on SDG&E’s part by providing that, to the extent permitted or required by California \nlaw, SDG&E will impose on a Large Load security requirements comparable to those the TO \nTariff requires of an ECLL.  SDG&E will file any such retail agreement with the Commission for \ninformational purposes, if required.  This approach is consistent with the Commission’s finding \nthat agreements between a transmission owner and a large load customer that guarantee \ncontributions to the transmission revenue requirement should be filed with the Commission, its \nsuggestion that a transmission owner may rely on credit support posted by a large load under a \nretail agreement, and its statement that the Commission “in no way intend[s] to preempt or \ninterfere” with state-level ratepayer protection efforts.21 \n \n \n \n \n20  TO Tariff Section 8.1.3. \n21  Show Cause Order at p. 83 and n. 183."},{"page":18,"startToken":8196,"endToken":8719,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 18 of 25 \n \nIII. \nFLEXIBLE LARGE LOADS AND FLEXIBLE INTERIM LOAD \nINTERCONNECTION SERVICE \n \n \nThe Show Cause Order at P 104 preliminarily found “that new transmission services should \nbe available to reflect the operational reality that large loads may use the transmission system to \ndiffering extents and certain large loads are willing and able to limit their use of the transmission \nsystem under certain conditions.”  While most of the Show Cause Order’s discussion on the subject \nof flexible loads is directed at CAISO, it also points to PTO tariffs as allegedly “lack[ing] \nappropriate provisions recognizing within the study process for the provision of transmission \nservice the unique operational characteristics of large loads that are willing and able to limit their \nenergy withdrawals under certain conditions, which may thereby lessen or potentially avoid the \nneed for certain network upgrades.”  Id.  at P 59. \n \nWith respect to these concerns, SDG&E has participated in CAISO’s Large Load \nEnhancements stakeholder process.22  After considering stakeholder input, the “CAISO proposes \nto create a new flexible interconnection service option that will enable ECLL and co-located loads \nto limit their energy withdrawals or injections until their network upgrades are placed into \nservice.”23   SDG&E notes that provision of this particular interconnection service requires a study \nprocess to establish and enforce the necessary limits.  However, the “CAISO does not propose to \ncreate new ‘transmission services’ or more responsibilities around eligible customers, which \nwould require redesigning transmission and interconnection service entirely”.  Id.  CAISO explains \nthat Load Serving Entities and the Scheduling Coordinator for the ECLL can schedule demand as \nneeded in real time, including those wishing to limit their use of the transmission system.  Id. \n \nThe CAISO proposes to create a new FILI service that will enable faster interconnections \nwhile mitigating transmission constraints.  The proposed FILI offering would enable an ECLL to \ninterconnect and receive transmission service up to a level that is less than what the ECLL has \nrequested in its interconnection application.  The interim level of service will be established based \non grid conditions and constraints until network upgrades are complete, at which time the ECLL \nwould be allowed to take service at its requested level.  The CAISO notes that implementing FILI \nservice may involve a number of tools or measures, including but not limited to a Remedial Action \nScheme (“RAS”), TO operator curtailment, or managing to a predetermined schedule.  The CAISO \nindicates that, with CAISO and Reliability Coordinator concurrence, the TO may implement \nautomated schemes, such as a RAS, for a FILI. \n \nIn this filing, SDG&E proposes to establish a FILI framework that is similar to that \nproposed by the CAISO, although SDG&E will establish limits on ECLL grid withdrawals based \non studies conducted during the interconnection process, not on near-real-time or real-time \noperating conditions.  If the CAISO establishes a limit based on its proposed FILI tariff offering, \n \n22  See generally CAISO, Large Loads Stakeholder Initiative, available at \nhttps://stakeholdercenter.caiso.com/StakeholderInitiatives/Large-loads.  \n23  CAISO Large Load Enhancements, Draft Final Proposal (Sept. 24, 2026) at 67, available at \nhttps://stakeholdercenter.caiso.com/InitiativeDocuments/Draft-Final-Proposal-Large-Load-\nEnhancements-Sep-24-26.pdf."},{"page":19,"startToken":8719,"endToken":9248,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 19 of 25 \n \nit is SDG&E’s understanding that the CAISO would require that the ECLL enter into a three-party \nagreement with the PTO and the CAISO.  This agreement would set forth the near-real-time or \nreal-time operating procedures under which the CAISO’s limit would be implemented. \n \nSDG&E’s FILI proposal directly addresses the Commission’s concern that the “study \nprocess” within the PTOs’ existing tariffs lacks provisions recognizing that large loads may be \nwilling and able to limit their energy withdrawals under certain conditions.  By providing ECLL \nwithdrawal limits established in the interconnection study process, Large Loads that are willing \nand able to honor these limits may be able to energize a portion of their requested load prior to \ncompletion of the transmission upgrades necessary for full energization.  During the \ninterconnection study process, SDG&E will determine the maximum level of interim load that can \nbe reliably served before completion of all required transmission upgrades, and the energization \nlimits by period will be documented in Appendix I of the Interconnection Agreement.   \n \nAfter COD, SDG&E may update the withdrawal limit to reflect changes in modeling \nassumptions, system conditions, and then-available transmission capability.  A customer electing \nFILI service would be required to maintain the capability to manage grid withdrawals in \naccordance with its Interconnection Agreement and to install and commission the protection, \ncontrol, and other equipment specified in Appendix J before commencing service.  Where real-\ntime curtailment is required, SDG&E’s TO Tariff revisions contemplate ECLL, SDG&E, and \nCAISO will execute a further agreement describing the curtailment circumstances, mechanism, \nresponse times, restoration, and testing.  The level of FILI service would remain subject to \noperational assessments by the TO and CAISO and could be curtailed as necessary to preserve \nreliable grid operations, and SDG&E may disconnect an ECLL whose withdrawals exceed the \nauthorized limit.24 \n \nThis framework provides a defined means to recognize and utilize an ECLL’s willingness \nand ability to limit its energy withdrawals, potentially allowing earlier interconnection while \nmaintaining reliability until the required network upgrades and other interconnection facilities are \nplaced in service.  It also mirrors the Commission’s finding that a customer taking interim service \nshould have the control technologies and protection systems needed to limit withdrawals to the \napproved level.  SDG&E addresses FILI in the TO Tariff in Sections 10.20 and 10.21 and in Article \n5.9.1 and Appendices I and J of the pro forma Interconnection Agreement.  To the extent there \nwere any existing partial interim service for Eligible Customers other than ECLLs, such service \nwould continue (Section 10.18). \n \nIV. \nCO-LOCATED LARGE LOADS \n \nAn ECLL serving a Co-Located Large Load must provide information concerning the \nassociated generation, including the executed generator interconnection agreement or, if none \nexists, a queue number that will allow SDG&E to verify that the generator has submitted an \ninterconnection application (Section 10.5(xi)).  CAISO and SDG&E will publish study results \n \n24  Whether or not a Large Load has elected FILI service, the Large Load, like any other load, is always \nsubject to curtailment in the event of emergencies that jeopardize the reliability of the larger grid."},{"page":20,"startToken":9248,"endToken":9709,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 20 of 25 \n \nreflecting the combined presence of the Generating Units and Co-Located Large Loads, and \nmemorialize those results in the generator’s LGIA.  Section 10.22 as proposed allocates \nresponsibility between the two tariffs: the CAISO Tariff governs the interconnection of the \nGenerating Unit, and the TO Tariff governs the interconnection of the ECLL, with neither tariff \nexempting a party from its cost responsibility obligations under the other tariff.  These provisions \nrespond to the Commission’s concern that an Eligible Customer be designated to take transmission \nservice on behalf of co-located load (P 94). \n \nV. \nGRID ENHANCING TECHNOLOGIES \n \nThe Show Cause Order expresses concern at P 60 that CAISO and PTO tariffs lack clear \nand consistent provisions requiring the evaluation of alternative transmission technologies25 as \npotential solutions to accommodate an ECLL request for transmission service.  Continuing, the \nOrder at P 61 states that CAISO and/or the PTOs should either: (a) explain whether their tariffs \nremain just and reasonable without provisions requiring “evaluation of alternative transmission \ntechnologies” and if such technologies are not selected, “demonstration [in study reports] why \nalternative transmission technologies” either were not feasible, would not lower costs, or would \nnot provide for a faster timeline; or (b) propose implementing tariff changes. \n \nIn response, SDG&E states that consistent with California state law,26 SDG&E already \nevaluates the feasibility of Grid Enhancing Technologies (“GETs”) and other alternative \ntransmission technologies.27  These evaluations consider, among other factors, feasibility, cost, \nachievable capacity, implementation timelines, reliability, and other relevant considerations.  \nThese analyses are performed in connection with SDG&E’s role in the CAISO TPP.  Consistent \nwith this framework, the CAISO’s TPP specifically considers GETs, including advanced \nconductors, dynamic line ratings, power flow controllers, and topology optimization, as potential \nalternatives when developing solutions to identified transmission needs.28  SDG&E proposes to \nleverage this existing analytical framework, in its capacity as a PTO, when evaluating an \n \n25 See Show Cause Order at p. 60 (defining the terms “alternative transmission technologies” and “Grid \nEnhancing Technologies” interchangeably to include” static synchronous compensators, static VAR \ncompensators, advanced power flow control devices, transmission switching, synchronous condensers, \nvoltage source converters, advanced conductors, tower lifting, and dynamic line ratings.”). \n26  California Senate Bill 1006 (Chapter 597, Statutes of 2024). \n27  See, e.g., “A Study of the Feasibility of Projects Using Grid Enhancing Technologies and \nReconductoring with Advanced Conductors,” Submittal to California Independent System Operator \nCorporation by San Diego Gas and Electric Company in compliance with Cal.  Senate Bill 1006 (Jan.  \n1, 2026), available at https://www.sdge.com/sites/default/files/documents/2025-12/SDGE_SB-\n1006_12292025_Clean.pdf.  \n28  See CAISO, 2026-2027 Transmission Planning Process Study Plan at 71, § 2.4, \nhttps://stakeholdercenter.caiso.com/InitiativeDocuments/2026-2027-Transmission-Planning-Process-\nand-Study-plan-jun-15-26.pdf."},{"page":21,"startToken":9709,"endToken":10094,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 21 of 25 \n \napplication to interconnect an ECLL and seeking concurrence from CAISO.  SDG&E has included \nevaluation of alternative transmission technologies in Section 10.13 of the TO Tariff. \n \nVI. \nBRIEFING QUESTIONS \n \nThe Show Cause Order at PP 123-125 includes three briefing questions that apply to \nTransmission Owners. \n \n \nA. \nExisting Commercial Arrangements \n \n \nParagraph 123 of the Show Cause Order states: \n \nWe direct further briefing regarding how CAISO and the Participating \nTransmission Owners … should protect existing commercial arrangements \nincluding: (1) what would be a reasonable implementation period to ensure minimal \ndisruption to such existing commercial arrangements, and (2) how to allow a \nreasonable amount of time to finalize ongoing agreements that are nearing \ncompletion as of the date such tariff provisions are filed with the Commission. \n \nSDG&E Response: (1) Not applicable to SDG&E.  As of the date of this filing, SDG&E has no \nexisting commercial arrangements that would be affected by SDG&E’s proposed changes to its \nTO Tariff.  (2) Not applicable to SDG&E.  As of the date of this filing, SDG&E has no in-\nprogress agreements with ECLLs that are “nearing completion.” \n \nB. \nPlanning Impacts from Flexible Services for Large Loads \n \nParagraph 124 of the Show Cause Order states: \n \n \nToday’s order proposes ...  to establish new transmission services that recognize \nflexible large loads’ ability and willingness to limit their use of the transmission \nsystem under certain conditions....  Specifically, what, if any, potential impacts on \nregional and local transmission planning would arise from the introduction of the \nnew transmission services discussed herein? For example, when planning for load \ngrowth, how would transmission providers and planners account for flexible large \nloads’ potential preference to take the new transmission services, including \npotential uncertainties around the type, location, and quantity of such expected \nloads? \n \nSDG&E Response: The possible use of FILI service may allow an ECLL to energize load earlier \nthan would otherwise be possible if the ECLL were required to defer its desired load energization \nuntil all required network upgrades were in service.  The CAISO’s PTOs coordinate with the \nCAISO in the development of transmission planning studies and the underlying power flow base \ncases.  This coordination ensures that the impacts of large loads, both existing and planned, on the \ntransmission system are accounted for."},{"page":22,"startToken":10094,"endToken":10556,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 22 of 25 \n \nBecause SDG&E’s proposed FILI service will set grid withdrawal limits in the \ninterconnection study process, the established limits can be directly incorporated in the planning \nbase cases that are developed in coordination with the CAISO.  Furthermore, SDG&E will include \nan ECLL project in regional and local transmission planning base cases only after the ECLL has \nexecuted an Interconnection Agreement and provided the required financial security for \nconstruction.  This commitment threshold will help ensure that transmission planning reflects \nsufficiently committed projects and their applicable grid withdrawal limits, while preventing \nspeculative or uncommitted FILI requests evaluated through the interconnection study process \nfrom distorting regional or local transmission planning assumptions.   \n \nSDG&E’s proposed approach is comparable to the framework used by the California \nEnergy Commission (“CEC”) in developing its large-load forecasts used for CAISO transmission \nplanning.  Under the CEC’s framework, proposed data-center loads are differentiated based on \nproject maturity, including whether the project is an inquiry, an active application, or has a signed \nagreement, with different confidence levels applied based on the likelihood of project \ncompletion.29  Accordingly, both approaches seek to ensure that transmission planning \nappropriately reflects the degree of commitment and likelihood of materialization of prospective \nlarge-load projects, rather than treating all project requests as equally certain. \n \nC. \nStructures to Prevent Cost Shifts \n \n \nParagraph 125 of the Show Cause Order requires: \n \nRespondents to include information regarding potential structures for agreements \nbetween the transmission owner/provider and an Eligible Customer to prevent \nunjust and unreasonable cost shifts among transmission customers related to \nnetwork upgrade costs required for large loads.  Further, please include information \non what an appropriate minimum level of cost recovery and financial security from \nan Eligible Customer would be under any such agreements. \n \nSDG&E Response: SDG&E’s proposed pro forma Interconnection Agreement includes the \ncomplete agreement between SDG&E as the TO and the ECLL regarding the measures that \nSDG&E will use to effectively eliminate any possibility of cost shifting from the ECLL to other \ntransmission ratepayers as a result of Large Load failure or under-performance.  As an initial \nmatter, the ECLL will be required to provide up-front funding in cash of all Interconnection \nFacilities, thereby eliminating any possible cost shifting for those facilities.30  Further, because the \nfinancial security for necessary network upgrades must be posted by the ECLL prior to the start of \nconstruction for those upgrades,31 and because the amount of such security is equal to the full \n \n29  See CEC, Data Center Data Collection and Forecasting, slide 9, available at \nhttps://www.energy.ca.gov/sites/default/files/2026-\n08/Data_Center_Data_Collection_and_Forecasting_ada.pdf.  \n30  See Appendix XIV, Article 11.5(ii)(a). \n31  Id., Article 11.5."},{"page":23,"startToken":10556,"endToken":10966,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 23 of 25 \n \nprojected present value of the lifecycle revenue requirements of the network upgrades,32 there is \nvirtually no cost-shifting risk. \n \nVII. \nISSUES TO BE ADDRESSED THROUGH THE CAISO TARIFF \n \nThe Show Cause Order raised concerns and issued directives that apply to the CAISO and \nnot the PTOs.  SDG&E understands these concerns and directives will be addressed through the \nCAISO’s tariff and related processes.  CAISO’s proposals are discussed and detailed in CAISO’s \nLarge Load Enhancements stakeholder process, in which SDG&E participated and provided input.  \nThese directives include: \n \n• \nthe definitions of co-located load and Behind the Meter Generation (“BTMG”) (PP 88-89); \n• \nthe rates, terms, and conditions of service that apply to interconnection customers serving \nco-located load, including the scope of CAISO’s analyses of co-location arrangements (PP \n93, 96); \n• \ntransmission services reflecting an Eligible Customer’s willingness and ability to limit \nwithdrawals, including interim non-firm network transmission service and permanent firm \nand non-firm contract demand transmission services (PP 94, 100-101); \n• \ntransmission and ancillary service charges, including regulation and black start services, \nfor Eligible Customers taking service on behalf of Eligible Load (PP 95, 98-99); \n• \nthe netting of BTMG against gross load for purposes of calculating Regional Access \nCharges (P 102); and \n• \ngenerator interconnection study processes and services for generating facilities serving \nelectrically proximate large loads or large co-located loads, and the transmission service \nsuch Eligible Customers must take (PP 113-119). \n \nVIII. CONFORMING AND MINISTERIAL REVISIONS \n \nSDG&E notes that in addition to defining the new term “Large Load,” it has added related \ndefinitions necessary to make its proposed framework operative, and these additions have required \nthe re-numbering of virtually all definitions within Section 3.  Among the added definitions are \nCo-Located Large Load (Section 3.9), Commercial Operation Date (Section 3.11), EMT Study \n(Section 3.23), Eligible Customer for Large Load (Section 3.25), FILI Service (Section 3.36), \nInterconnection Customer (Section 3.53), Project (Section 3.86), Scoping Meeting (Section 3.98), \nand Site Control (Section 3.99).  In addition, the existing, but revised, definition of Reliability \nUpgrade (Section 3.93) now applies to any “Project,” so that the cost responsibility provisions \napply uniformly, and the revised definition of Transmission Revenue Credit (Section 3.114) now \nhas new language stating that the term includes any draw on or liquidation of security posted in \nconnection with network upgrades under an Interconnection Agreement with an ECLL.   \n \n \n32  Id., Article 11.5(ii)(b)."},{"page":24,"startToken":10966,"endToken":11451,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 24 of 25 \n \nSDG&E also proposes conforming changes, including replacing outdated cross-references \nto specific CAISO Tariff sections with references to “applicable sections” of the CAISO Tariff; \nreplacing references to WSCC with WECC; updating website references from OASIS to \nSDG&E’s website; updating the Rate Effective Period to a calendar-year basis; specifying that the \nTACBAA will be revised effective January 1 of each year (Section 5.6); replacing separate System \nImpact Study and Facilities Study Agreements with a single Study Agreement (Sections 3.106, \n9.1.2, 9.1.3, 10); and clarifying that the procedures for interconnection of wholesale generation are \ngoverned by the CAISO Tariff (Section 8.1). \n \nFinally, in preparing this filing, SDG&E became aware that a recent eTariff filing \ninadvertently superseded most of Section 3 of the TO Tariff with only a partial version of Section \n3.33  Specifically, the filing in question intended to modify the definition of “Transmission \nRevenue Credit” to include potential revenues from CAISO as a result of its implementation of \nthe Extended Day-Ahead Market (“EDAM”), but in so doing replaced the entire section with a \ntruncated version.  This filing uses what should have been the correct version of Section 3 as the \nbase reflecting the full section as it existed before being inadvertently superseded, plus the \ndefinition change made in the EDAM Revenues Filing, i.e., the version of Section 3 that would \nexist but for this inadvertent eTariff error.  The redlined version of Section 3 shows the proposed \nchanges to that base. \n \nIX. \nENCLOSURES \n \nEnclosed for filing are an eTariff Electronic Filing Package containing all required Tariff \nRecord Content Data and metadata, as well as the following filing attachments in PDF for posting \non eLibrary: \n \n1. this transmittal letter; \n2. a clean version of each new or modified Section or Appendix of the TO Tariff as filed in \neTariff, including the pro forma Study Agreement (Appendix XIII) and pro forma \nInterconnection Agreement (Appendix XIV); and \n3. redlined versions of each modified Section of the TO Tariff as filed in eTariff. \n \nX. \nEFFECTIVE DATE \n \nSDG&E requests that the Commission accept the tariff revisions contained in this filing \neffective Tuesday, February 16, 2027, which is ninety-two (92) days from the date of this filing.  \nSDG&E is prepared to implement the proposed revisions to its TO Tariff upon acceptance by the \nCommission.  In view of the upcoming holiday season, however, SDG&E believes that a modest \nextension to the usual 60-day notice period for Section 205 filings will facilitate the comment and \nreview processes on the tariff changes proposed herein.  SDG&E understands that CAISO, PG&E, \n \n33  See generally EDAM, Appendix IV, and Appendix VI Revisions to Transmission Owner Tariff, Docket \nNo.  ER26-1506-000 (filed Feb.  25, 2026) (the “EDAM Revenues Filing”), which was accepted, \neffective May 1, 2026, by unpublished letter order dated April 23, 2026."},{"page":25,"startToken":11451,"endToken":11700,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 25 of 25 \n \nSCE, and other California PTOs are requesting the same effective date for their proposed tariff \nchanges. \n \nXI. \nREQUEST FOR WAIVER \n \nTo the extent that any filing requirement in Part 35 of the Commission’s regulations is not \nsatisfied by this filing and the materials enclosed herewith, SDG&E respectfully requests waiver \nof such requirements. \n \nXII. \nCOMMUNICATIONS \n \nAll communications, correspondence, and documents related to this proceeding should be \nserved upon the following persons: \n \nPamela J.  Mills \n \n \n \nJonathan J.  Newlander \nRegulatory Policy Manager  \n \nSenior Counsel \nSan Diego Gas & Electric Company  \nSan Diego Gas & Electric Company \n8330 Century Park Court, CP31E \n \n8330 Century Park Court, CP32D \nSan Diego, CA 92123  \n \n \nSan Diego, CA 92123 \nPhone: 858-637-3746  \n \n \nPhone: 858-654-1652 \nE-mail: PMills@sdge.com \n \n \nE-mail: JNewlander@sdge.com  \n \nXIII. SERVICE \n \nSDG&E has served a copy of this filing upon the CAISO and the CPUC. \n \nXIV. CONCLUSION \n \nWHEREFORE, for the foregoing reasons, SDG&E respectfully requests that the \nCommission: (A) accept the proposed revisions to SDG&E’s TO Tariff as just and reasonable and \nnot unduly discriminatory or preferential; (B) grant the requested effective date of February 16, \n2027; and (C) terminate the show cause proceeding in Docket No.  EL26-71-000 as to SDG&E. \n \nRespectfully submitted, \n \n \n \n \n \n \n \n/s/ Jonathan J.  Newlander \n________________________ \nJonathan J.  Newlander  \nSan Diego Gas & Electric Company  \n8330 Century Park Court, CP32D \nSan Diego, California 92123  \nTelephone:  \n(858) 654-1652  \nEmail:  \nJNewlander@sdge.com \nNovember 16, 2026  \n \n \nAttorney for San Diego Gas & Electric Company26"},{"page":26,"startToken":11700,"endToken":11833,"text":"CERTIFICATE OF SERVICE \nI hereby certify that, pursuant to Rule 2010 of FERC’s Regulations, 18 C.F.R.  \n§ 385.2010, I have this day served the foregoing document upon the following representatives \nof the Public Utilities Commission of the State of California and the California Independent \nSystem Operator Corporation: \n \nNAME \nORGANIZATION/ADDRESS \nE-MAIL ADDRESS \nChristine J.  Hammond \nAssistant General Counsel \nCalifornia Public Utilities \nCommission \n505 Van Ness Avenue  \nSan Francisco, CA  94102 \nChristine.hammond@cpuc.ca.gov  \nAnthony Ivancovich \nDeputy General Counsel \nCalifornia Independent System \nOperator Corporation \n250 Outcropping Way  \nFolsom, CA  95630 \naivancovich@caiso.com   \nAndrew Ulmer \nAssistant General Counsel \nCalifornia Independent System \nOperator Corporation \n250 Outcropping Way  \nFolsom, CA  95630 \naulmer@caiso.com \n \nDated at San Diego, California, this 16th day of November, 2026. \n \n/s/ Jonathan J.  Newlander \n \nJonathan J.  Newlander"},{"page":27,"startToken":11833,"endToken":11837,"text":"SECTION 3 \nDEFINITIONS - REDLINES"},{"page":28,"startToken":11837,"endToken":12074,"text":"3.\nTO Definitions. Capitalized terms used in this TO Tariff shall have the meanings\nset out below unless otherwise stated or the context otherwise requires.\nCapitalized terms used in this tariff and not defined below shall have the\nmeanings set out in the ISO Tariff.\n3.1. \nAccess Charge. A charge paid to the ISO by all UDCs, MSSs and, in\ncertain cases, Scheduling Coordinators, delivering Energy to Gross Load, \nas set forth in Section 7.1applicable sections of the ISO Tariff. The Access \nCharge includes the High Voltage Access Charge, the Transition Charge, \nand the Low Voltage Access Charge. \n3.2. \nAGC. Generation equipment that automatically responds to signals from \nthe ISO’s EMS control in real time to control the power output of electric \ngenerators within a prescribed area in response to a change in system \nfrequency, tieline loading, or the relation of these to each other, so as to \nmaintain the target system frequency and/or the established interchange \nwith other areas within the predetermined limits. \n3.3. \nAncillary Services. Regulation, Spinning Reserve, Non-Spinning Reserve, \nReplacement Reserve, Voltage Support and Black Start together with such \nother interconnected operation services as the ISO may develop in \ncooperation with Market Participants to support the transmission of \nEnergy from Generation resources to Loads while maintaining reliable \noperation of the ISO Controlled Grid in accordance with Good Utility \nPractice. \n3.4. \nApplicable Reliability Criteria. The reliability standards established by"},{"page":29,"startToken":12074,"endToken":12272,"text":"NERC, WSCCWECC, and Local Reliability Criteria as amended from \ntime to time, including any requirements of the Nuclear Regulatory \nCommission. \n3.5. \nAvailable Transfer Capacity. For a given transmission path, the capacity \nrating in MW of the path established consistent with ISO and \nWSCCWECC transmission capacity rating guidelines, less any reserved \nuses applicable to the path. \n3.6. \nBase Transmission Revenue Requirement. The Transmission Revenue \nRequirement which does not reflect the Transmission Revenue Balancing \nAccount Adjustment (TRBAA) and Standby Transmission Revenues. \n3.7. \nBlack Start. The procedure by which a Generating Unit self-starts without \nan external source of electricity thereby restoring power to the ISO \nControlled Grid following system or local area blackouts. \n3.8. \nBusiness Day. A day on which banks are open to conduct general banking \nbusiness in California. \n3.9. \nCo-Located Large Load. A Large Load that is physically connected to the \nfacilities of an existing or planned generating facility on the \nInterconnection Customer’s side of the point of interconnection to the ISO \nControlled Grid.   \n3.10. Commercial Operation. The status of a Project that has commenced the \ngeneration, consumption, or transmission of electricity, excluding \nelectricity generated, consumed, or transmitted during initial testing and \ncommissioning."},{"page":30,"startToken":12272,"endToken":12491,"text":"3.11. 3.9Commercial Operation Date (“COD”). The date on which a Project \ncommences Commercial Operation as agreed to by the TO and the \nInterconnection Customer pursuant to the Interconnection Agreement, and \nin accordance with the implementation plan agreed to by the TO and the \nCAISO. \n3.12. Completed Application Date. The date on which a party submits an \nInterconnection Application that satisfies the requirements of a Completed \nInterconnection Application. \n3.1013. \nCompleted Interconnection Application. An Interconnection \nApplication  that satisfies all of the information and other requirements \nof Section 10.3  \nof the TO Tariff and, if applicable, the information \nrequirements as specified by the ISO and posted on the ISO Home Page. \n3.11. 3.14. Congestion. A condition that occurs when there is insufficient \nAvailable  \nTransfer Capacity to implement all Preferred Schedules \nsimultaneously or, \n in real time, to serve all Generation and Demand. \n“Congested” shall be  construed accordingly. \n.3.12 3.15. Congestion Management. The alleviation of Congestion in \naccordance  \nwith applicable ISO Protocols and Good Utility Practice. \n3.13.3.16. \nConverted Rights. Those transmission service rights as defined in \nSection  \n2.4.4.2.1applicable sections of the ISO Tariff. \n3.17. 3.14. CPUC. The California Public Utilities Commission, or its \nsuccessor. \n3.18. 3.15. Delivery Upgrade. The transmission facilities, other than Direct"},{"page":31,"startToken":12491,"endToken":12726,"text":"Assignment  Facilities and Reliability Upgrades, necessary to relieve \nconstraints on the \n ISO Controlled Grid and to ensure the delivery of \nenergy from a New \n \n Facility to Load. \n3.193.1.6. \nDemand. The rate at which Energy is delivered to Loads and \nScheduling Points by Generation, transmission or distribution facilities. It \nis the product of voltage and the in-phase component of alternating current \nmeasured in units of watts or standard multiples thereof, e.g., 1,000 W = 1 \nkW, 1,000 kW = 1 MW, etc. \n3.1720. \nDirect Assignment Facilities. Facilities or portions of facilities that \nare owned by the Participating TO necessary to physically and electrically \ninterconnect a particular party requesting Interconnection under this TO \nTariff to the ISO Controlled Grid at the point of interconnection. Direct \nAssignment Facilities shall be specified in the Interconnection Agreement \nthat governs Interconnection service to such party and shall be subject to \nFERC approval..  \n3.1821. \nDispatch. The operating control of an integrated electric system to: \ni) assign specific Generation Units and other sources of supply to effect\nthe supply to meet the relevant area Demand taken as Load rises or falls; \nii) control operations and maintenance of high voltage lines, substations,\nand equipment, including administration of safety procedures; iii) operate \ninterconnections; iv) manage Energy transactions with other \ninterconnected Control Areas; and v) curtail Demand. \n3.1922. \nDistribution System. The distribution assets of a TO or UDC or"},{"page":32,"startToken":12726,"endToken":12956,"text":"MSS. \n3..20  23. \nElectromagnetic Transient (“EMT”) Study. A study using \nelectromagnetic time-domain simulation and detailed equipment and \ncontrol models, as applicable, to evaluate the performance of an \nInterconnection request and its potential interactions with or impacts on \nthe transmission system, consistent with applicable NERC requirements, \nas may be modified from time to time. \n3.24. Eligible Customer. (i) Any utility (including Participating TOs, Market      \nParticipants and any power marketer), Federal power marketing agency, or \nany person generating Energy for sale or resale; Energy sold or produced \nby such entity may be Energy produced in the United States, Canada or \nMexico; however, such entity is not eligible for transmission service that \nwould be prohibited by Section 212(h)(2) of the Federal Power Act; and \n(ii) any retail customer taking unbundled transmission service pursuant to \na state retail access program or pursuant to a voluntary offer of unbundled \nretail transmission service by the Participating TO. \n.3.213.25. \nEligible Customer for Large Load (“ECLL”). An Eligible \nCustomer taking transmission service on behalf of a Large Load. \n3.26. Encumbrance. A legal restriction or covenant binding on the Participating \nTO that affects the operation of any transmission lines or associated \nfacilities and which the ISO needs to take into account in exercising \nOperational Control over such transmission lines or associated if the \nParticipating TO is not to risk incurring significant liability."},{"page":33,"startToken":12956,"endToken":13182,"text":"Encumbrances shall include Existing Contracts and may include: (1) other \nlegal restrictions or covenants meeting the definition of Encumbrance and \narising under other arrangements entered into before the ISO Operations \ndate, if any; and (2) legal restrictions or covenants meeting the definition \nof Encumbrance and arising under a contract or other arrangement entered \ninto after the ISO Operations Date.  \n3.2227. \nEnd Use Customer or End-User. A purchaser of electric power \nwho purchases such power to satisfy a Load directly connected to the ISO \nControlled Grid or to a Distribution System and who does not resell the \npower. \n3.2328. \nEnergy. The electrical energy produced, flowing, or supplied by \ngeneration, transmission or distribution facilities, being the integral with \nrespect to time of the instantaneous power, measured in units of watt-\nhours or standard multiples thereof, e.g., 1,000 Wh = 1 kWh, 1,000 kWh = \n1 MWh, etc. \n3.2429. \nEntitlements. The right of the Participating TO obtained through \ncontract or other means to use another entity’s transmission facilities for \nthe transmission of Energy. \n3.24130. \nExceptional Dispatch. As defined in Appendix A of the currently \neffective MRTU Tariff, a Dispatch Instruction issued for the purposes \nspecified in Section 34.9 of the MRTU Tariff. \n3.2531. \nExisting Contracts. The contracts which grant transmission service \nrights in existence on the ISO Operations Date (including any contacts"},{"page":34,"startToken":13182,"endToken":13393,"text":"entered into pursuant to such contracts) as may be amended in accordance \nwith their terms or by agreement between the parties thereto from time to \ntime. \n3.2632. \nExisting Rights. Those transmission service rights defined in \nSection 2.4.4.1.1applicable sections of the ISO Tariff. \n3.2733. \nExpedited Interconnection Agreement. A contract between a party \nwhich has submitted a Request for Expedited Interconnection Procedures \nand the Participating TO to agree to process, on an expedited basis, the \nCompleted Interconnection Application of such party and which sets forth \nthe terms, conditions, and cost responsibilities for such interconnection. \n.3.28 Facilities Study Agreement. An agreement between a Participating TO and \neither a party requesting Interconnection to the ISO Controlled Grid, \nMarket Participant, Project Sponsor, or identified principal beneficiaries \npursuant to which the party requesting such Interconnection, Market \nParticipants, Project Sponsor, or identified principal beneficiaries agrees to \nreimburse the Participating TO for the cost of performing or reviewing a \nFacilities Study. \n3.293.34. \nFacility or Facilities Study. An engineering study conducted to \ndetermine required modifications to the Participating TO’s transmission \nsystem, including the estimated cost and scheduled completion date for \nsuch modifications that will be required to provide needed services. \n3.3035. \nFERC. The Federal Energy Regulatory Commission, or its \nsuccessor."},{"page":35,"startToken":13393,"endToken":13652,"text":"3.31.3.36. \nFlexible Interim Load Interconnection (“FILI”) Service.  \nInterconnection service provided by the TO to an ECLL at the ECLL’s \noption, as set forth in the ECLL’s IA, enabling energization of a portion of \nthe ECLL’s requested load addition pending completion of such \nReliability Upgrades as the TO determines are necessary for full load \nenergization. \n3.37. FPA. Parts II and III of the Federal Power Act, 16 U.S.C. § 824 et seq., as \nthey may be amended from time to time. \n3.3238. \nFTR (Firm Transmission Right). A contractual right, subject to the \nterms and conditions of the ISO Tariff, that entitles the FTR Holder to \nreceive, for each hour of the term of the FTR, a portion of the Usage \nCharges received by the ISO for transportation of energy from a specific \noriginating Zone to a specific receiving Zone and, in the event of an \nuneconomic curtailment to manage Day-Ahead congestion, to a Day-\nAhead scheduling priority higher than that of a schedule using Converted \nRights capacity that does not have an FTR. \n3.3339. \nFTR Holder. The owner of an FTR, as registered with the ISO. \n3.3440. \nGenerating Unit. An individual electric generator and its associated \nplant and apparatus whose electrical output is capable of being separately \nidentified and metered or a Physical Scheduling Plant that, in either case, \nis: (a) located within the ISO Control Area; (b) connected to the ISO \nControlled Grid, either directly or via interconnected transmission, or \ndistribution facilities, and (c) that is capable of producing and delivering"},{"page":36,"startToken":13652,"endToken":13905,"text":"net Energy (Energy in excess of a generating station’s internal power \nrequirements). \n3.3541. \nGeneration. Energy delivered from a Generating Unit. \n3.3642. \nGood Utility Practice. Any of the practices, methods, and acts \nengaged in or approved by a significant portion of the electric utility \nindustry during the relevant time period, or any of the practices, methods, \nand acts which, in the exercise of reasonable judgment in light of the facts \nknown at the time the decision was made, could have been expected to \naccomplish the desired result at a reasonable cost consistent with good \nbusiness practices, reliability, safety, and expedition. Good Utility Practice \nis not intended to be any one of a number of the optimum practices, \nmethods, or acts to the exclusion of all others, but rather to be acceptable \npractices, methods, or acts generally accepted in the region. \n3.3743. \nGross Load. Gross Load is all energy (adjusted for distribution \nlosses) delivered for the supply of End-User Loads directly connected to \nthe transmission facilities or distribution system of the Participating TO. \nGross Load shall exclude the portion of the load of an individual End-Use \nCustomer of the Participating TO that is served by a Generating Unit that: \n(a) is located on the customer’s site through over-the-fence arrangements \nas authorized by Section 218 of the California Public Utilities Code; (b) is \na qualifying small power production facility or qualifying cogeneration \nfacility, as those terms are defined in the FERC’s regulations \nimplementing Section 201 of the Public Utility Regulatory Policies Act of"},{"page":37,"startToken":13905,"endToken":14136,"text":"1978; (c) was serving the customer’s Load on or before March 31, 2000; \nand (d) secured Standby Service from the Participating TO under terms \napproved by a Local Regulatory Authority or FERC as applicable, as of \nMarch 31, 2000 and continues to secure Standby Service from the \nParticipating TO or can be curtailed concurrently with an outage of the \nGenerating Unit serving the Load. \n3.3844. \nHigh Voltage Access Charge. A component of the Access Charge \ndetermined by the ISO and assessed to the Participating TO under Section \n7.1applicable sections of the ISO Tariff. \n3.3945. \nHigh Voltage Transmission Facility. A transmission facility under \nthe operational control of the ISO that is owned by the Participating TO or \nto which the Participating TO has an Entitlement that is represented by a \nConverted right and that operates at a voltage at or above 200 kilovolts, \nand supporting facilities, and the costs of which are not directly assigned \nto one or more specific customers. \n3.4046. \nHigh Voltage Transmission Revenue Requirement. The portion of \nthe Participating TO’s TRR associated with and allocable to the \nParticipating TO’s High Voltage Transmission Facilities and Converted \nRights associated with High Voltage Transmission Facilities. \n3.4147. \nHigh Voltage Utility Specific Rate. The Participating TO’s High \nVoltage Transmission Revenue Requirement divided by the Participating \nTO’s forecasted Gross Load. \n3.4248. \nHigh Voltage Wheeling Access Charge. The Wheeling Access"},{"page":38,"startToken":14136,"endToken":14391,"text":"Charge assessed by the ISO associated with the recovery of the \nParticipating TOs’ High Voltage Transmission Revenue Requirements in \naccordance with Section 7.1applicable sections of the ISO Tariff. \n3.4349. \nInter-Zonal Interface. The (i) group of transmission paths between \ntwo adjacent Zones of the ISO Controlled Grid, for which a physical, non-\nsimultaneous transmission capacity rating (the rating of the interface) has \nbeen established or will be established prior to the use of the interface for \nCongestion Management; (ii) the group of transmission paths between an \nISO Zone and an adjacent Scheduling Point, for which a physical, non-\nsimultaneous transmission capacity rating (the rating of the interface) has \nbeen established or will be established prior to the use of the interface for \nCongestion Management; or (iii) the group of transmission paths between \ntwo adjacent Scheduling Points, where the group of paths has an \nestablished transfer capability and established transmission rights. \n3.4450. \nInterconnection. Transmission facilities, other than additions or \nreplacements to existing facilities that: i) connect one system to another \nsystem where the facilities emerge from one and only one substation of the \ntwo systems and are functionally separate from the ISO Controlled Grid \nfacilities such that the facilities are, or can be, operated and planned as a \nsingle facility; or ii) are identified as radial transmission lines pursuant to \ncontract; or iii) produced Generation at a single point on the ISO \nControlled Grid; provided that such interconnection does not include \nfacilities that, if not owned by the Participating TO, would result in a"},{"page":39,"startToken":14391,"endToken":14612,"text":"reduction in the ISO’s Operational Control of the Participating TO’s \nportion of the ISO Controlled Grid. \n3.4551. \nInterconnection Agreement. A contract between a party requesting \ninterconnection and the Participating TO that owns the transmission \nfacility with which the requesting party wishes to interconnect. \n3.4652. \nInterconnection Application. An application that requests \nInterconnection to the ISO Controlled Grid. \n3.53.3.47. \nInterconnection Customer.  The Eligible Customer requesting \ninterconnection to the ISO Controlled Grid. \n3.54. Interest. Interest shall be calculated in accordance with the methodology \nspecified for interest on refunds in the regulations of FERC at 18 C.F.R. \n§35.19(a)(2)(iii)(1996). Interest on delinquent amounts shall be calculated \nfrom the due date of the bill to the date of payment. When payments are \nmade by mail, bills shall be considered as having been paid on the date of \nreceipt. \n3.4855. \nIndependent System Operator (“ISO” or “CAISO”). The California \nIndependent System Operator Corporation, as state chartered, nonprofit \ncorporation that controls the transmission facilities of all Participating TOs \nand dispatches certain Generating Units and Loads. \n3.4956. \nISO ADR Procedures. The procedures for resolution of disputes or \ndifferences set out in Section 13applicable sections of the ISO Tariff, as \namended from time to time. \n3.5057. \nISO Controlled Grid or CAISO Controlled Grid. The system of"},{"page":40,"startToken":14612,"endToken":14850,"text":"transmission lines and associated facilities of the Participating TOs that \nhave been placed under the ISO’s Operational Control. \n3.5158. \nISO Protocols. The rules, protocols, procedures and standards \nattached to the ISO Tariff as Appendix L, promulgated by the ISO (as \namended from time to time) to be complied with by the ISO Scheduling \nCoordinators, Participating TOs and all other Market Participants in \nrelation to the operation of the ISO Controlled Grid and the participation \nin the markets for Energy and Ancillary Services in accordance with the \nISO Tariff. \n3.5259. \nISO Tariff. The California Independent System Operator \nCorporation Operating Agreement and Tariff, dated March 31, 1997, as it \nmay be modified from time to time. \n3.60 \nLarge Load.  A new customer, located at a single site behind one or more \npoints of interconnection to the CAISO Controlled Grid, and that has a \npeak load of 50 MW or greater. \n3.61.3.53. \nLoad. An end-use device of an End-Use Customer that consumes \npower. Load should not be confused with Demand, which is the measure \nof power that a Load receives or requires. \n3.5462. \nLocal Furnishing Bond. Tax-exempt bonds utilized to finance \nfacilities for the local furnishing of electric energy, as described in section \n142(f) of the Internal Revenue Code, 26 U.S.C. § 142(f). \n3.5563. \nLocal Furnishing Participating TO. Any Tax-Exempt Participating \nTO that owns facilities financed by Local Furnishing Bonds."},{"page":41,"startToken":14850,"endToken":15071,"text":"3.5664. \nLocal Publicly Owned Electric Utilities. A municipality or \nmunicipal corporation operating as a public utility furnishing electric \nservice, a municipal utility district furnishing electric service, a public \nutility district furnishing electric services, and irrigation district furnishing \nelectric services, or a joint powers authority that include one or more of \nthese agencies and that owns Generation or transmission facilities, or \nfurnishes electric services over its own or its members’ electric \nDistribution System. \n3.5765. \nLocal Regulatory Authority. The state or local governmental \nauthority responsible for the regulation or oversight of a utility. \n3..5866. \nLocal Reliability Criteria. Reliability criteria established at the ISO \nOperations Date, unique to the transmission systems of each of the \nParticipating TOs. \n3.5967. \nLow Voltage Access Charge. The Access Charge applicable under \nSection 7.1applicable sections of the ISO Tariff to recover the Low \nVoltage Transmission Revenue Requirement of the Participating TO. \n3.6068. \nLow Voltage Transmission Facility. A transmission facility under \nthe operational control of the ISO owned by the Participating TO or to \nwhich the Participating TO has an Entitlement that is represented by a \nConverted Right, which is not a High Voltage Transmission Facility, and \nsupporting facilities, and the costs of which are not directly assigned to \none or more specific customers. \n3.6169. \nLow Voltage Transmission Revenue Requirement. The portion of"},{"page":42,"startToken":15071,"endToken":15295,"text":"the Participating TO’s TRR associated with and allocable to the \nParticipating TO’s Low Voltage Transmission Facilities and Converted \nRights associated with Low Voltage Transmission Facilities. \n3..6270.  \nLow Voltage Wheeling Access Charge. The Wheeling Access \nCharge associated with the recovery of the Participating TO’s Low \nVoltage Transmission Revenue Requirement in accordance with Section \n7.1applicable sections of the ISO Tariff. \n3.6371. \nMarket Participant. An entity, including a Scheduling Coordinator, \nwho participates in the Energy marketplace though the buying, selling, \ntransmission, or distribution of Energy or Ancillary Services into, out of, \nor through the ISO Controlled Grid. \n3.6472. \nMSS (Metered Subsystem). A geographically contiguous system of \na New Participating TO, located within a single Zone which has been \noperating for a number of years prior to the ISO Operations Date \nsubsumed within the ISO Control Area and encompassed by ISO certified \nrevenue quality meters at each interface point with the ISO Controlled \nGrid and ISO certified revenue quality meters on all Generating Units \ninternal to the system, which is operated in accordance with an agreement \ndescribed in Section 3.3.1applicable sections of the ISO Tariff. \n3.6573. \nNERC. The North American Electric Reliability Council or its \nsuccessor. \n3.6674. \nNew Facility. (a) Each generating unit that proposes to sell its \nGeneration at wholesale that seeks to connect to the ISO Controlled Grid;"},{"page":43,"startToken":15295,"endToken":15526,"text":"(b) each existing generating unit directly interconnected to the ISO \nControlled Grid that will be repowered and increases the total capability of \nthe power plant; or (c) each existing generating unit directly \ninterconnected to the ISO Controlled Grid that will be repowered, \nincreasing the total capability of the power plant but has changed the \nelectrical characteristics of the power plant such that its reenergization \nmay violate Applicable Reliability Criteria and require additional Direct \nAssignment Facilities or Reliability Upgrades. \n3.6775. \nNew Facility Operator. The owner of a planned New Facility, or its \ndesignee. \n3.6876. \nNew High Voltage Transmission Facility. A High Voltage \nTransmission Facility of the Participating TO that enters service after the \nbeginning of the transmission period described in Section 4 of Schedule 3 \nof Appendix Fapplicable sections of the ISO Tariff, or a capital addition \nmade after the beginning of the transition period described in Section 4.1 \nof Schedule 3 of Appendix F of the ISO Tariff to an Existing High \nVoltage Transmission Facility. \n3.6977. \nNew Participating TO. A Participating TO that is not an Original \nParticipating TO. \n3.7078. \nNon-Participating TO. A TO that is not a party to the TCA or for \nthe purposes of Sections 2.4.3 and 2.4.4applicable sections of the ISO \nTariff the holder of transmission service rights under an Existing Contract \nthat is not a Participating TO."},{"page":44,"startToken":15526,"endToken":15762,"text":"3.7179. \nNon-Self-Sufficient Access Charge. A charge for access to the ISO \nControlled Grid, referenced in certain Existing Contracts to be paid by the \nExisting Contract holder to the Participating TO. The Participating TO’s \nnon-self-sufficient contract demand rate shall be calculated by dividing the \nBase Transmission Revenue Requirement by the sum of the highest hourly \nsystem demand forecast to be delivered by the Participating TO to End-\nUse Customers connected to its transmission and distribution facilities for \neach month of the year used by the Participating TO for base transmission \nrate development. \n3..7280.  \nNon-Spinning Reserve. The portion of off-line generating capacity \nthat is capable of being synchronized and ramping to a specified load in \nten minutes (or load that is capable of being interrupted in ten minutes) \nand that is capable of running (or being interrupted) for at least two hours. \n3.7381. \nOperational Control. The rights of the ISO under the Transmission \nControl Agreement and the ISO Tariff to direct Participating TOs how to \noperate their transmission lines and facilities and other electric plant \naffecting the reliability of those lines and facilities for the purpose of \naffording comparable non-discriminatory transmission access and meeting \nApplicable Reliability Criteria. \n3.7482. \nOriginal Participating TO. A participating TO that was a \nParticipating TO as of January 1, 2000. The Original Participating TO’s \nare Pacific Gas and Electric Company, Southern California Edison \nCompany, and San Diego Gas & Electric Company."},{"page":45,"startToken":15762,"endToken":16005,"text":"3.7583. \nParticipating TO. A party to the TCA whose application under \nSection 2.2 of the TCA has been accepted and who has placed its \ntransmission assets and Entitlements under the ISO’s Operational Control \nin accordance with the TCA.  A Participating TO may be an Original \nParticipating TO or a New Participating TO. For purposes of this TO \nTariff, the Participating TO is San Diego Gas & Electric Company. \n3.7684. \nParticipation Agreement. An agreement between a Participating \nTO and a Project Sponsor that specifies the terms and conditions under \nwhich the Participating TO will construct a transmission addition or \nupgrade on behalf of the Project Sponsor. \n3.7785. \nPhysical Scheduling Plant. A group of two or more related \nGenerating Units, each of which is individually capable of producing \nEnergy, but which either by physical necessity or operational design must \nbe operated as if they were a single Generating Unit and any Generating \nUnit or Units containing related multiple generating components which \nmeet one or more of the following criteria: i) multiple generating \ncomponents are related by a common flow of fuel which cannot be \ninterrupted without a substantial loss of efficiency of the combined output \nof all components; ii) the Energy production from one component \nnecessarily causes Energy production from other components; iii) the \noperational arrangement of related multiple generating components \ndetermines the overall physical efficiency of the combined output of all \ncomponents; iv) the level of coordination required to schedule individual"},{"page":46,"startToken":16005,"endToken":16227,"text":"generating components would cause the ISO to incur scheduling costs far \nin excess of the benefits of having scheduled such individual components \nseparately; or v) metered output is available only for the combined output \nof related multiple generation components and separate generating \ncomponent metering is either impractical or economically inefficient. \n.3.783.86. \nProject. The facilities for which the Interconnection Customer is \nrequesting interconnection, but shall not include the Interconnection \nCustomer’s owned Interconnection facilities. \n3.87. Project Proponent. A Market Participant or group of Market Participants \nthat: (i) advocates a transmission addition or upgrade; (ii) is unwilling to \npay the full cost of the proposed transmission addition and upgrade, and \nthus is not a Project Sponsor; and (iii) initiates proceedings under the ISO \nADR Procedures to determine the need for the proposed transmission \naddition or upgrade. \n3.7988. \nProject Sponsor. A Market Participant or group of Market \nParticipants or a Participating TO that proposes the construction of a \ntransmission addition or upgrade in accordance with Section 3.2applicable \nsections of the ISO Tariff. \n3.8089. \nRegional Transmission Group (“RTG”). A voluntary organization \napproved by FERC and composed of transmission owners, transmission \nusers, and other entities, organized to efficiently coordinate the planning, \nexpansion and use of transmission on a regional and inter-regional basis. \n3.8190. \nRegulation. The service provided by Generating Units equipped"},{"page":47,"startToken":16227,"endToken":16473,"text":"and operating with AGC which will enable such units to respond to the \nISO’s direct digital control signals in an upward and downward direction \nto match, on a real time basis, Demand and resources, consistent with \nestablished NERC and WSCCWECC operating criteria. Regulation is \nused to control the power output of electric generators within a prescribed \narea in response to a change in system frequency, tieline loading, or the \nrelation of these to each other so as to maintain the target system \nfrequency and/or the established interchange with other areas within the \npredetermined limits. \n3.8291. \nReliability Criteria. Pre-established criteria that are to be followed \nin order to maintain desired performance of the ISO Controlled Grid under \ncontingency or steady state conditions. \n3.8392. \nReliability Services. Those services provided by the ISO: 1) that \nare deemed by the ISO as necessary to maintain reliable electric in the ISO \nControl Area; and 2) whose costs are billed by the ISO to the Participating \nTO pursuant to the ISO Tariff. In addition, Reliability Services shall \ninclude services provided by the Participating TO as a result of \nimplementing ISO Operating Procedure M-438, whose stated purpose is to \nenhance reliability grid operations and local area reliability; services \nobtained from Reliability Must Run units; local out of market dispatch \ncalls; generation committed pursuant to the ISO’s must-offer requirement \nwhen the unit is committed for local reliability; and local out of market \ndispatch calls; upon implementation of Market Redesign and Technology"},{"page":48,"startToken":16473,"endToken":16697,"text":"Upgrade, generators committed pursuant to the ISO’s Exceptional \nDispatch authority., and any default loss pursuant to applicable sections of \nthe ISO Tariff billed to the Participating TO resulting from the ISO’s use \nof its Exceptional Dispatch authority. \n3.8493. \nReliability Upgrade. The transmission facilities, other than Direct \nAssignment Facilities, at or beyond the first point of \nInterconnectioninterconnection necessary to interconnect a New Facility \nor wholesale loadProject safely and reliably to the ISO Controlled Grid, \nwhich would not have been necessary but for the Interconnection of a New \nFacility or wholesale loadProject, including network upgrades necessary \nto remedy short circuit or stability problems resulting from the \ninterconnection of a New Facility or wholesale loadProject to the ISO \nControlled Grid.  Reliability Upgrades also include, consistent with \nWSCCWECC practice, the facilities necessary to mitigate any adverse \nimpact a New Facility’s or wholesale load’sProject’s interconnection may \nhave on a path’s WSCCWECC path rating. Reliability Upgrades shall be \nspecified in the Interconnection Agreement that governs Interconnection \nservice to the New Facility Operator or wholesale load and shall be subject \nto FERC approvalProject. \n3.8594. \nReplacement Reserve. Generating capacity that is dedicated to the \nISO, capable of starting up if not already operating, being synchronized to \nthe ISO Controlled Grid, and ramping to a specified Load point within a \nsixty (60) minute period, the output of which can be continuously"},{"page":49,"startToken":16697,"endToken":16920,"text":"maintained for a two hour period. Also, Curtailable Demand that is \ncapable of being curtailed within sixty minutes and that can remain \ncurtailed for two hours. \n3.8695. \nRequest for Expedited Interconnection Procedures. A written \nrequest by which an applicant for Interconnection can request expedited \nprocessing of its Interconnection Application. \n3.8796. \nScheduling Coordinator. An entity certified by the ISO for the \npurposes of undertaking the functions specified in Section 2.2.6applicable \nsections of the ISO Tariff. \n3.8897. \nScheduling Point. A location at which the ISO Controlled Grid is \nconnected, by a group of transmission paths for which a physical, non-\nsimultaneous transmission capacity rating has been established for \nCongestion Management, to transmission facilities that are outside the \nISO’s Operational Control. A Scheduling Point typically is physically \nlocated at an “outside” boundary of the ISO Controlled Grid (e.g., at the \npoint of interconnection between a Control Area utility and the ISO \nControlled Grid). For most practical purposes, a Scheduling Point can be \nconsidered to be a Zone that is outside the ISO’s Controlled Grid. \n.3.893.98. \nScoping Meeting. The meeting between representatives of the \nInterconnection Customer and Transmission Owner conducted for the \npurpose of discussing the interconnection request and interconnection \noptions, exchanging information including any transmission data and \nearlier study evaluations that would be reasonably expected to impact such"},{"page":50,"startToken":16920,"endToken":17152,"text":"interconnection options, refining information and models provided by the \nInterconnection Customer, and analyzing such information. \n3.99. Site Control.  Documentation reasonably demonstrating: (1) ownership \nof, a leasehold interest in, or a right to develop a site for the purpose of \nconstructing the Project; (2) an option to purchase or acquire a leasehold \nsite for such purpose; or (3) an exclusivity or other business relationship \nbetween Interconnection Customer and the entity having the right to sell, \nlease or grant Interconnection Customer the right to possess or occupy a \nsite for such purpose. \n3.100. Spinning Reserve. The portion of unloaded synchronized generating \ncapacity that is immediately responsive to system frequency and that is \ncapable of being loaded in ten minutes, and that is capable of running for \nat least two hours. \n3.90101. \nStandby Rate. A rate assessed a Standby Service Customer by the \nParticipating TO, as approved by the Local Regulatory Authority, or \nFERC, as applicable, for Standby Service which compensates the \nParticipating TO, among other things for costs of High Voltage \nTransmission Facilities. \n3.91102. \nStandby Service. Service provided by the Participating TO which \nallows a Standby Service Customer, among other things, access to High \nVoltage Transmission Facilities for the delivery of backup power on an \ninstantaneous basis to ensure that Energy may be reliably delivered to the \nStandby Service Customer in the event of an outage of a generating Unit"},{"page":51,"startToken":17152,"endToken":17368,"text":"serving the customer’s Load. \n3.92103. \nStandby Service Customer. A retail End-Use Customer of the \nParticipating TO that receives Standby Service and pays a Standby Rate. \n3.93104. \nStandby Transmission Revenue. The transmission rate revenues \nassociated with Standby Service collected by the Participating TO from \nthose Standby Service Customers who are not billed for Standby Service \non a Gross Load basis. \n3.94105. \nSystem Impact Study. An engineering study conducted to \ndetermine whether a request for Interconnection to the ISO Controlled \nGrid would require new transmission additions, upgrades, or other \nmitigation measures. \n3..95 System Impact 106. Study Agreement. An agreement between a \nParticipating TO and an entity that has requested Interconnection to the \nParticipating TO’s transmission system pursuant to which the entity \nrequesting Interconnection agrees to reimburse the Participating TO for \nthe cost of performing or reviewing a System Impact Study., a Facilities \nStudy, and/or an Electromagnetic Transient Study. \n3.96107. \nRate Effective Period. The period during which transmission \nservice rates calculated pursuant to the formula rate provisions contained \nin Appendix IX are effective. The initial Rate Effective Period shall be \nOctoberSeptember 1, 20032013, or such other date as may be provided by \nFERC, through June 30, 2004.December 31, 2014. Each subsequent Rate \nEffective Period shall be the twelve-month period from JulyJanuary 1"},{"page":52,"startToken":17368,"endToken":17591,"text":"through June 30December 31. \n3.97108. \nTO Tariff. This Transmission Owner Tariff, as it may be amended \nor superseded. \n3.98109. \nTransition Charge. A component of the Access charge determined \nby the ISO and assessed the Participating TO along with the High Voltage \nAccess Charge in accordance with Section 5.7 of Appendix F, Schedule \n3applicable sections of the ISO Tariff. \n3.99110. \nTransmission Access Charge Balancing Account Adjustment \n(“TACBAA”). A mechanism established by the Participating TO which \nwill ensure that the difference between (i) the actual billings by the ISO \npursuant to Section 7.1.2applicable sections of the ISO Tariff for the High \nVoltage Access Charge and Transition Charge and (ii) the revenues \ndisbursed by the ISO pursuant to Section 7.1.3applicable sections of the \nISO Tariff are recovered from the Participating TO’s End-Use Customers. \n3.100111. \nTransmission Control Agreement (“TCA”). The agreement \nbetween the ISO and Participating TOs establishing the terms and \nconditions under which TOs will become Participating TOs and how the \nISO and each Participating TO will discharge their respective duties and \nresponsibilities, as may be modified from time to time. \n3.101112. \nTransmission Owner (“TO”). An entity owning transmission \nfacilities or having firm contractual rights to use transmission facilities. \n3.102113. \nTransmission Revenue Balancing Account Adjustment \n(“TRBAA”). A mechanism established by the Participating TO which will"},{"page":53,"startToken":17591,"endToken":17825,"text":"ensure that all Transmission Revenue Credits and other credits specified in \nSections 6 and 8 of Appendix F, Schedule 3applicable sections of the ISO \nTariff, flow through to transmission customers. \n3.103114. \nTransmission Revenue Credit. The net of: 1) the revenues received \nby the Participating TO from the ISO for Wheeling service, including \nEDAM Recoverable Revenue, Usage Charges (excluding any Usage \nCharges received by the Participating TO as an FTR Holder) and from the \nsale of an FTR; and any additional appropriate amounts included in the \nISO tariff definition of Transmission Revenue Credit set forth in Appendix \nA of the CAISO Tariff; 2) Existing Transmission Contract (“ETC”) and \nTransmission Ownership Rights (“TOR”) Cost Differentials which include \nthe shortfall or surplus resulting from any cost differences between \nTransmission Losses and Ancillary Service requirements associated with \nExisting Rights and the ISO’s rules and protocols; 3) ISO Charge Type \n4575 identified as Settlements, Metering, and Client Relations charge; and \n4) CAISO Charge Types 7989 and 7999, identified as Invoice Deviation \nInterest Distribution and Invoice Deviation Interest Allocation, as \ndetermined by the CAISO and consistent with the CAISO tariff. ;  and 5) \na draw or liquidation of security in connection with Network Upgrades \nunder an Interconnection Agreement with an ECLL. \n3.104115. \nTransmission Revenue Requirement (“TRR”). The TRR is the total \nannual authorized revenue requirement associated with transmission \nfacilities and Entitlements turned over to the Operational Control of the"},{"page":54,"startToken":17825,"endToken":18065,"text":"ISO by the Participating TO. The costs of any transmission facility turned \nover to the Operational Control of the ISO shall be fully included in the \nParticipating TO’s TRR. The TRR includes the costs of transmission \nfacilities and Entitlements and deducts Transmission Revenue Credits and \ncredits for Standby Transmission Revenue and the transmission revenue \nexpected to be actually received by the Participating TO for Existing \nRights and Converted Rights. The TRR is shown in Appendix I. \n3.105116. \nUncontrollable Force. Any act of God, labor disturbance, act of the \npublic enemy, war, insurrection, riot, fire, storm, flood, earthquake, \nexplosion, any curtailment, order, regulation or restriction imposed by \ngovernmental military or lawfully established civilian authorities or any \nother cause beyond the reasonable control of the ISO or Market \nParticipant (as the case may be) which could not be avoided through the \nexercise of Good Utility Practice. \n3.106117. \nUsage Charge. The amount of money, per 1kW of scheduled flow, \nthat the ISO charges a Scheduling Coordinator for use of a specific \ncongested Inter-Zonal Interface during a given hour. \n3.107118. \nUtility Distribution Company (“UDC”). An entity that owns a \nDistribution System for the delivery of Energy to and from the ISO \nControlled Grid, and that provides regulated retail electric service to \nEligible Customers, as well as regulated procurement service to those \nEnd-Use Customers who are not yet eligible for direct access, or who \nchoose not to arrange services through another retailer."},{"page":55,"startToken":18065,"endToken":18303,"text":"3.108119. \nVoltage Support. Services provided by Generating Units or other \nequipment such as shunt capacitors, static var compensators, or \nsynchronous condensers that are required to maintain established grid \nvoltage criteria.  This service is required under normal or system \nemergency conditions. \n3.109120. \nWestern System Coordinating Council (“WSCCWECC”). The \nWestern Systems Coordinating Council or its successor. \n3.110121. \nWheeling Access Charge. The charge assessed by the ISO that is \npaid by a Scheduling Coordinator for Wheeling in accordance with \nSection 7.1applicable sections of the ISO Tariff. Wheeling Access \nCharges shall not apply for Wheeling under a bundled non-economy \nEnergy coordination agreement of a Participating TO executed prior to \nJuly 9, 1996. The Wheeling Access Charge may consist of a High Voltage \nWheeling Access Charge and a Low Voltage Wheeling Access Charge. \n3.111122. \nWheeling Out. Except for Existing Rights exercised under an \nExisting Contract in accordance with Sections 2.4.3 and 2.4.4.applicable \nsections of the ISO Tariff, the use of the ISO Controlled Grid for the \ntransmission of Energy from a Generating Unit located within the ISO \nControlled Grid to serve a Load located outside the transmission and \nDistribution system of a Participating TO. \n3.112123. \nWheeling Through. Except for Existing Rights and Non-Converted \nRights exercised under an Existing Contract in accordance with Sections \n2.4.3 and 2.4.4 of the ISO Tariff, the use of the ISO Controlled Grid for"},{"page":56,"startToken":18303,"endToken":18392,"text":"the transmission of Energy from a resource located outside the ISO \nControlled Grid to serve a Load located outside the transmission and \ndistribution system of a Participating TO. \n3.113124. \nWheeling. Wheeling Out or Wheeling Through. \n3.114125. \nWholesale Customer. A person wishing to purchase Energy and \nAncillary Services at a Bulk Supply Point or a Scheduling Point for resale. \n3.115126. \nZone. A portion of the ISO Controlled Grid within which \nCongestion is expected to be small in magnitude or to occur infrequently. \n“Zonal” shall be construed accordingly."},{"page":57,"startToken":18392,"endToken":18400,"text":"SECTION 5 \nACCESS CHARGES AND TRANSMISSION RATES - REDLINES"},{"page":58,"startToken":18400,"endToken":18623,"text":"5.\nAccess Charges and Transmission Rates.\n5.1. \nLow Voltage Access Charge. The Low Voltage Access Charge\nshall be determined in accordance with the ISO Tariff. The Low \nVoltage Access Charge customer, shall pay the Participating TO, \nLow Voltage Access Charge equal to the product of the \nParticipating TO’s Low Voltage Access Charge rate and the Low \nVoltage Access Charge customer’s Gross Load, as provided by the \nISO. The Participating TO’s monthly charges to be applied to \nLow Voltage Access Charge customers are determined pursuant \nto the provisions of Appendices VIII and IX hereof. The Low \nVoltage Access Charge applicable for the current Rate Effective \nPeriod is shown on SDG&E’s OASISwebsite, which can be \naccessed at www.sdge.com\\toforum,www.sdge.com or through a \nlink to SDG&E’s web page that is located on the CAISO website \nat www.caiso.com. \n5.2. \nWheeling Access Charge. The Wheeling Access Charge shall be \ndetermined in accordance with the ISO Tariff. The Wheeling \nAccess Charge, assessed by the ISO, consists of a High Voltage \nWheeling Access Charge and, if applicable, a Low Voltage \nWheeling Access Charge. The High Voltage Wheeling Access \nCharge is set forth in the ISO Tariff. The Participating TO’s Low \nVoltage Wheeling Access Charge is determined pursuant to the \nprovisions of Appendices VIII and IX hereof. The Low Voltage"},{"page":59,"startToken":18623,"endToken":18847,"text":"Wheeling Access Charge applicable for the current Rate Effective \nPeriod is available on SDG&E’s OASISwebsite, which is shown at \nwww.sdge.com\\toforum,www.sdge.com, or through a link to \nSDG&E’s web page that is accessible through the CAISO’s \nOASIS at www.caiso.com. \n5.3. \nEnd-User Transmission Rates. End-User transmission rates for \na FERC-jurisdictional Participating TO shall be based on the Base \nTransmission Revenue Requirement authorized by FERC. In \naddition, all End-Use Customers of a FERC-jurisdictional \nParticipating TO shall be subject to the FERC-authorized TRBAA \nrate and TACBAA rate. For a Local Publicly Owned Electric \nUtility that is a Participating TO, such rates shall be submitted to \nthe ISO for information only. In addition, all customers of a Local \nPublicly Owned Electric Utility that is a Participating TO shall be \nsubject to the Local Regulatory Authority authorized TRBAA, \nwhich shall also be submitted to the ISO. The Participating TO’s \nEnd-User transmission rates, by retail rate schedule, are \ndetermined pursuant to the provisions of Appendices VIII and IX \nhereof. The End-User transmission rates applicable during the \nRate Effective Period are available on SDG&E’s OASISwebsite, \nwhich is shown at www.sdge.com\\toforum,www.sdge.com, or \nthrough a link to SDG&E’s web page that is accessible through the \nCAISO’s OASIS at www.caiso.com. An End-User shall pay the"},{"page":60,"startToken":18847,"endToken":19040,"text":"same End-User transmission rate as other similarly situated End-\nUse Customers of the Participating TO regardless of its energy \nsupplier. End-Users withdrawing power from the Participating \nTO’s transmission or distribution facilities shall not qualify for \ntransmission access under the Wheeling Access Charge if FERC \nwould be prohibited from ordering transmission service for such \ncustomer by Section 212(h) of the FPA. \n5.4. \nTransmission Revenue Requirement. As set forth in the ISO \nTariff, the Transmission Revenue Requirement for each \nParticipating TO shall be used to develop the Access Charges set \nforth in the ISO Tariff. The Transmission Revenue Requirement, \nHigh Voltage Transmission Revenue Requirement, and Low \nVoltage Transmission Revenue Requirement for the Participating \nTO are set forth in Appendix I. \n5.5. \nTransmission Revenue Balancing Account Adjustment (TRBAA). \nThe Participating TO shall maintain a Transmission Revenue \nBalancing Account Adjustment (“TRBAA”) that will ensure that \nall Transmission Revenue Credits and the refunds, specified in \nSections 6 and 8 of Appendix F. Schedule 3 of the ISO Tariff, \nassociated with transmission service are flowed through to \ncustomers taking transmission service from the ISO. The TRBAA \nshall be equal to: \nTRBAA = Cr + Cf + I +FF&U"},{"page":61,"startToken":19040,"endToken":19234,"text":"Where: \n \n Cr =  The principal balance in the TRBAA recorded in FERC Account \nNo. 254 as of September 30 of the year prior to commencement \nof the January billing cycle. This balance represents the \nunamortized balance in the TRBAA from the previous period and \nthe difference in the amount of revenues from Transmission \nRevenue Credits and the amount of such revenues that has been \nrefunded to customers through operation of the TRBAA, adjusted \nfor franchise fees and uncollectible accounts expense; \nCf = The forecast of Transmission Revenue Credits for the following \ncalendar year; \nI = \nThe interest balance for the TRBAA, which shall be calculated \nusing the interest rate pursuant to Section 35.19(a) of FERC’s \nregulations under the Federal Power Act (18 CFR Section \n35.19(a)). Interest shall be calculated based on the average \nTRBAA principal balance each month, compounded quarterly; and \nFF&U= \nAn adjustment for franchise fees and uncollectible \naccounts.  \nBeginning in January of each year, the bills of End-Use \nCustomers of the Participating TO shall include, as a component \nof the End-User transmission rates, a TRBAA rate per kilowatt-\nhour (rounded to the nearest $0.00001) equal to: \nTRBAA Rate = TRBAA"},{"page":62,"startToken":19234,"endToken":19435,"text":"S \n \nWhere: \nS = The total kilowatt-hours of Gross Load measured at the \ncustomer meter level as recorded for the twelve month period \nending September 30 of the year prior to commencement of the \nJanuary billing cycle. \n5.6  \nTransmission Access Charge Balancing Account Adjustment \n(TACBAA). Commencing on the transition date determined \nunder Section 4 ofUnder Schedule 3 to Appendix F of the ISO \nTariff, the Participating TO shall maintain a Transmission \nAccess Charge Balancing Account Adjustment (TACBAA). \nEach month the Participating TO shall make two entries to the \nTACBAA. One entry will equal the difference between (i) the \nactual charges by the ISO to the Participating TO pursuant to \nSection 26.1.2 of the ISO Tariff for the High Voltage Access \nCharge and Transition Charge and (ii) the Revenues disbursed \nby the ISO to the Participating TO pursuant to Section 26.1.3 of \nthe ISO Tariff. The second entry will equal the TACBAA rate \nrevenues, adjusted for franchise fees and uncollectible accounts \nexpense, billed to End-Use Customers during the month. Interest \non the amounts accumulated in the TACBAA shall be calculated \nbased on the average TACBAA principal balance each month, \ncompounded quarterly, using the interest rate pursuant to Section"},{"page":63,"startToken":19435,"endToken":19654,"text":"35.19(a) of FERC’s regulations under the Federal Power Act (18 \nC F R  Section 35.19(a)). For service rendered on and after the \neffective date of new retail rates, authorized by the CPUC, \nmodifying the frozen retail rates established pursuant to California \nAssembly Bill 1890, the bills of End-Use Customers of the \nParticipating TO shall include, as a component of the End- User \ntransmission rates, a TACBAA rate per kilowatt-hour (rounded to \nthe nearest $0.00001) equal to: \nTACBAA Rate = Br + Bf – Rf + FF&U \nS \nWhere: \nBr = The Balance of the TACBAA, including interest, consisting of the recorded \nbalance and the projected change for the remaining months of the  period \nprior to the commencement of the billing cycle implementing a new \nrate; \nBf = A forecast of the annual Access Charge billings from the ISO; \nRf = A forecast of the annual revenues disbursed by the ISO to the Participating \nTO pursuant to Section 26.1.3 of the ISO Tariff; \nFF&U = An adjustment for franchise fees and uncollectible accounts; and \nS = Total Gross Load, in kilowatt-hours measured at the customer meter level, \nrecorded for the most recent twelve-month period prior to the \nParticipating TO’s filing with FERC to revise the TACBAA rate. \nThe TACBAA shall be revised effective January 1 of each year; however, nothing"},{"page":64,"startToken":19654,"endToken":19674,"text":"herein shall preclude the Participating TO from filing with the FERC to revise the TACBAA \nrate at any other time."},{"page":65,"startToken":19674,"endToken":19686,"text":"SECTION 8 \nOBLIGATION TO INTERCONNECT OR CONSTRUCT TRANSMISSION \nEXPANSIONS & FACILITY UPGRADES - REDLINES"},{"page":66,"startToken":19686,"endToken":19911,"text":"8.\nObligation to Interconnect or Construct Transmission Expansions & Facility\nUpgrades.\n8.1. \nParticipating TO Obligation to Interconnect. The Participating TO shall, at\nthe request of a third party pursuant to Section 10, interconnect its system \nto the generation or loadProject of such third party, or modify an existing \nInterconnection. Interconnections under this TO Tariff shall be available \nto entities eligible to request Interconnection consistent with the \nprovisions of Section 210(a) of the FPA. Interconnections requested by \nentities or individuals that are not so eligible shall be governed by the \nLocal Regulatory Authority. The procedures to interconnect transmission \nfacilities and wholesale load to the ISO Controlled Grid shall be governed \nby this TO Tariff and the ISO Tariff, as applicable.  The procedures for \nInterconnection of wholesale generation to the ISO Controlled Grid shall \nbe governed by the ISO Tariff. \n8.1.1. Interconnection to Transmission System. Interconnection must be \nconsistent with Good Utility Practice, in conformance with all \nApplicable Reliability Criteria, all applicable statutes, and ISO \nreliability criteria for the ISO Controlled Grid. The Participating \nTO will not accommodate the Interconnection if doing so would \nimpair system reliability, or would otherwise adversely affect the \nability of the Participating TO to honor its Encumbrances existing \nas of the time an entity submits its Interconnection Application. \nThe Participating TO shall identify any such adverse effect on its"},{"page":67,"startToken":19911,"endToken":20115,"text":"Encumbrances in the System Impact Study performed pursuant to \nSection 10.7. To the extent that Participating TO determines that \nthe Interconnection of a New FacilityProject will have an adverse \neffect on Encumbrances, the New Facility OperatorEligible \nCustomer shall mitigate such adverse effect. \n8.1.2. Costs Associated with Interconnection. Each partyEligible \nCustomer requesting Interconnection of a Project shall be solely \nresponsible for and shall pay the costs of planning, installing, \noperating, and maintaining Direct Assignment Facilities and if \napplicable, as further set forth below, any Reliability Upgrades \nrequired to provide the requested Interconnection.  \nAs set forth in Section 8.1.3 below, and as shall be \ndocumented in the Interconnection Agreement, Appendix XIV of \nthis TO Tariff, each ECLL shall be responsible for posting initial \nsecurity sufficient to cover the estimated present value of the life-\ncycle revenue requirements for required Reliability Upgrades. \nIn addition, such partyeach Eligible Customer shall \nimplement all existing operating procedures necessary to safely \nand reliably interconnect such party’s generation or wholesale \nloadProject (including an ECLL) to the facilities of the \nParticipating TO and to ensure the ISO Controlled Grid’s \nconformance with the ISO Grid Planning Criteria, and shall bear \nall costs of implementing such operating procedures. A New"},{"page":68,"startToken":20115,"endToken":20321,"text":"Facility OperatorAn Eligible Customer shall be responsible for the \ncosts of Reliability Upgrades only: (a) if the necessaryCAISO does \nnot identify such facilities are not includedas needed in the ISO \nControlled Grid Transmission Expansion Plan approved as the \nNew Facility Operator’s Completed Application Date, orits \ntransmission planning process ; or (b) the date for the installation \nof a facility CAISO has previously identified as needed in its \ntransmission planning process is advanced by the interconnection \nof the New FacilityProject, in which case the New Facility \nOperatorEligible Customer shall be responsible only for the \nincremental costs associated with the earlier installation of the \nfacility.  Each New Facility Operator may, at its own discretion, \nsponsor, pursuant to Section 3.2applicable sections of the ISO \nTariff and Section 9 of this TO Tariff, any Delivery Upgrades.  \nAny additional costs associated with accommodating the \nInterconnection shall be allocated in accordance with the cost \nresponsibility methodology set forth in the ISO Tariff for \ntransmission expansions or upgrades, if applicable, or for an \nEligible Customer (including ECLL) other than New Facility \nOperator, the cost responsibility methodology set forth in this TO \nTariff. \n8.1.3. Security Requirement for ECLL.  The ECLL shall maintain \nsecurity for a period of time beginning with the ECLL’s"},{"page":69,"startToken":20321,"endToken":20546,"text":"authorization for SDG&E to begin construction of the Reliability \nUpgrades.  The requirement for the ECLL to maintain security \nshall end on the earlier of (i) the date when the TO has drawn all \navailable security, or (ii) ten years after the COD of the required \nReliability Upgrade having the latest COD.   \n  \nThe TO may draw annually on the then-available security.  In the \nevent the ECLL becomes aware that the Large Load will fail to \nreach COD, or will cease operation after COD, the ECLL shall \npromptly notify TO.  The TO may draw the full amount of the \nthen-available security at any time the TO has reasonably \ndetermined that the Large Load will not reach COD, or following \nCOD will cease operations.  The amount of such annual draws, if \nany, shall be determined by subtracting the ECLL’s actual Deemed \nTransmission Revenues for the year from that year’s minimum \nrequirement, where such subtraction returns a positive result.  The \namount of such draws shall be recorded in SDG&E’s Transmission \nRevenue Balancing Account Adjustment (“TRBAA”) as a credit \nwhich will reduce TAC rates.    \n  \nThe minimum annual requirements shall be set in advance and \ndocumented in the Interconnection Agreement.  The minimum \nannual requirements shall be set such that the estimated present \nvalue of those annual requirements equals the estimated present \nvalue of the forecast lifecycle revenue requirements associated"},{"page":70,"startToken":20546,"endToken":20754,"text":"with required Reliability Upgrades, including both capital and \nO&M-related costs.  Actual Deemed Transmission Revenues shall \nbe calculated for each year as the product of the applicable high \nvoltage/low voltage TAC rate and the ECLL’s metered energy \nwithdrawals from the transmission grid.  The term “Deemed \nTransmission Revenues” shall mean the product of such \ncalculation.  Metering arrangements necessary to determine actual \ndeemed transmission revenues, shall be as mutually agreed by the \nECLL and the TO. \nThe amount of security remaining at the end of each year will be \nthe larger of zero, or the amount of security remaining at the end of \nthe preceding year, less the sum of (a) actual Deemed \nTransmission Revenues during the current year, and (b) any \nsecurity draws during the current year. \nThe required security will decline over time as the ECLL generates \nactual deemed transmission revenues and/or the TO draws upon \nsuch security.     \n8.1.4. Security Requirement for TO Sponsored Projects.  It is neither \nnecessary nor practical for SDG&E to execute an agreement with \nitself or to collect/post security from/to itself.  However, to the \nextent permitted or required by California state law, if SDG&E is \nthe entity responsible for providing retail electric service to a Large"},{"page":71,"startToken":20754,"endToken":20964,"text":"Load, SDG&E shall impose security requirements on such Large \nLoad comparable to those that this TO Tariff requires of an ECLL.  \nIf required, SDG&E shall file with FERC for informational \npurposes, any such retail agreement under which such security is \nimposed. \n8.1.5. Interconnection Agreement. Pursuant to, and in accordance with \nthe procedures set forth in Section 10.4, 10.7.1, or 10.9.1 of this \nTO Tariff, a party requesting Interconnection shall request in \nwriting that the Participating TO tender an Interconnection \nAgreement to such party. The Participating TO shall tender to the \nparty requesting Interconnection an Interconnection Agreement \nthat, if necessary, will be filed with FERC, or the Local Regulatory \nAuthority, in the case of a Local Publicly Owned Electric Utility. \nThe Interconnection Agreement will include, without limitation, \ncost, responsibilities and payment provisions for any engineering, \nequipment, construction, operation and maintenance costs for any \nDirect Assignment Facilities and any Reliability Upgrades, and \nDelivery Upgrades, if applicable, and for any other mitigation \nmeasures.  For an Interconnection request to remain a Completed \nInterconnection Application, the party requesting the \nInterconnection shall, within thirty (30) Calendar days of receipt of \nthe tendered Interconnection Agreement, either (i) execute the \nInterconnection Agreement and return it to the Participating TO"},{"page":72,"startToken":20964,"endToken":21180,"text":"within thirty (30) Calendar days of receipt. Alternatively, if, or (ii) \nrequest that the Participating TO file the Interconnection \nAgreement unexecuted at FERC. If an Eligible Customer \nrequesting the Interconnection requests the Participating TO to file \nan unexecuted Interconnection Agreement and commits to abide \nby the terms, conditions, and cost assignments determined to be \njust and reasonable under the ISO ADR Procedures including any \ndetermination by FERC or on appeal of a FERC determination in \naccordance with that process, the Participating TO shall promptly \nfile an unexecuted Interconnection Agreement. Provided, however, \nthat if the ISO ADR Procedures concerns whether the requesting \nentity is an Eligible Customer, the Participating TO shall not be \nobligated to file an unexecuted Interconnection Agreement or \ncommence construction of the Interconnection facilities or incur \nother costs under the Interconnection Agreement until a final order \ndetermining the just and reasonable rates, terms, and conditions for \nsuch Interconnection Agreement has been issued by the applicable \ncourt or regulatory authority.  The Interconnection Agreement \nwill, the form for which is Appendix XIV to this TO Tariff, as \ntendered shall set forth a payment schedule that enables the \nParticipating TO to recover its costs. If the applicant elects not to \nexecute the Interconnection Agreement and does not request the \nParticipating TO to file an unexecuted Interconnection Agreement,"},{"page":73,"startToken":21180,"endToken":21370,"text":"its Completed Interconnection Application shall be deemed \nwithdrawn, and the applicant shall reimburse to the Participating \nTO all costs reasonably incurred in processing the applicant not \ncovered by any System Impact Study Agreement or Facilities \nStudy Agreement. \n8.1.35.1 Queuing Provisions. To maintain its queue position, the \nNew Facility OperatorEligible Customer must timely \ncomply with the interconnection requirements of Section \n5.7applicable sections of the ISO Tariff and/or Sections 8.1 \nand 10 of this TO Tariff. If the New Facility \nOperatorEligible Customer fails to timely comply with such \ninterconnection requirements, such New Facility \nOperatorEligible Customer shall pay the reasonable costs of \nrevising the System Impact Studies for other New Facility \nOperator’sEligible Customers that have established a new \nqueue position due to the New Facility OperatorEligible \nCustomer either withdrawing its Interconnection \nApplication or because its queue position has been modified \npursuant to the queuing provisions in Section \n5.7.4.4applicable sections of the ISO Tariff. \n8.1.46 Due Diligence to Construct. The Participating TO shall use due \ndiligence to construct, within a reasonable time, any Direct \nAssignment Facilities and any Reliability Upgrades that it is"},{"page":74,"startToken":21370,"endToken":21602,"text":"obligated to construct pursuant to this TO Tariff and, as applicable, \nSection 5.7 sections of the ISO Tariff. \n8.1.57 Energization. The Participating TO shall not be obligated to \nenergize, nor shall the New Facility Operator or wholesale \nloadEligible Customer be entitled to have its interconnection to the \nISO Controlled Grid energized, unless and until an Interconnection \nAgreement has been executed, or filed at FERC pursuant to \nSection 8.1.3, and becomes effective and such New Facility \nOperator or wholesale loadEligible Customer has demonstrated to \nthe ISO’s and the Participating TO’s reasonable satisfaction that it \nhas complied with all of the requirements of Section 5.7applicable \nsections of the ISO Tariff and the requirements of this TO Tariff. \n8.1.68 Coordination with ISO on Interconnection Requests. The \nParticipating TO shall coordinate with the ISO, pursuant to the \nprovisions of the TCA and the ISO Tariff, as applicable, in \ndeveloping Interconnection standards and guidelines for processing \nInterconnection requests under this TO Tariff. \n8.2 \nParticipating TO Obligation to Construct Transmission Expansions or \nFacility Upgrades. The Participating TO shall be obligated to: (1) perform \nSystem Impact or Facility Studies where the Project Sponsor or the ISO \nagrees to pay the study cost and specifies the project objectives to be \nachieved, and (2) build transmission additions and facility upgrades where \nthe Participating TO is obligated to construct or expand facilities in"},{"page":75,"startToken":21602,"endToken":21765,"text":"accordance with and subject to the limitations of Section 3.2,applicable \nsections of the ISO Tariff, and this TO Tariff. \n8.2.1 Obligation to Construct. A Participating TO shall not be obligated \nto construct or expand Interconnection facilities, transmission \nfacilities or system upgrades unless and until the conditions stated \nin Section 9.2.1 hereof have been satisfied. \n8.2.2 Local Furnishing Participating TO Obligation to Construct. A \nLocal Furnishing Participating TO shall not be obligated to \nconstruct or expand Interconnection facilities, transmission \nfacilities or system upgrades unless and until the conditions stated \nin Section 9.3.3 hereof have been satisfied. \n8.3 \nRequest for FERC Deference Regarding Need Determination. It is \nintended that FERC grant substantial deference to the factual \ndeterminations of the ISO, (including the ISO’s ADR Procedures), the \nCPUC, WSCCWECC, or RTG coordination planning processes as to the \nneed for or construction of a facility, the need for full cost recovery, and \nthe allocation of costs."},{"page":76,"startToken":21765,"endToken":21770,"text":"SECTION 9 EXPANSION \nPROCESS - REDLINES"},{"page":77,"startToken":21770,"endToken":21995,"text":"9.\nExpansion Process.\n9.1. \nDetermination of Facilities. A Participating TO shall perform a Facilities\nStudy in accordance with this Section where (1) the Participating TO is \nobligated to construct or expand facilities in accordance with Section \n3.2applicable sections of the ISO Tariff and this TO Tariff; (2) a Market \nParticipant agrees to pay the costs of the Facilities Study and specifies the \nproject objectives to be achieved in terms of increased capacity or reduced \ncongestion; or (3) the Participating TO is required to perform a Facilities \nStudy pursuant to the ISO Tariff. \n9.1.1. Payment of Facilities Study’s Cost. \n9.1.1.1. \nMarket Participant to Pay for Facilities Study. Where a \nMarket Participant requests a Facilities Study and the need \nfor the transmission addition or upgrade has not yet been \nestablished in accordance with the procedures established \nherein and the ISO Tariff, the Market Participant shall pay \nthe cost of the Facilities Study. \n9.1.1.2. \nProject Sponsor or Project Proponent to Pay for Facilities \nStudy. Where the facilities to be added or upgraded have \nbeen determined to be needed in accordance with the \nprocedures established herein and the ISO Tariff, the \nProject Sponsor, Project Proponent, or the ISO requesting \nthe study shall pay the reasonable cost of the Facilities \nStudy. When the Participating TO is the Project Sponsor in"},{"page":78,"startToken":21995,"endToken":22205,"text":"accordance with the ISO Tariff, the costs of the Facilities \nStudy shall be recovered through the Access Charges and \ntransmission rates. \n9.1.1.3. \nPrincipal Beneficiaries to Pay for Facilities Study. Where \nthe facilities to be added or upgraded have been determined \nto be needed and the principal beneficiaries have been \nidentified by the ISO or ISO ADR Procedures in \naccordance with the ISO Tariff, the Project Sponsor and the \nidentified principal beneficiaries shall pay the reasonable \ncost of the Facilities Study, in such proportions as may be \nagreed, or, failing agreement, as determined in accordance \nwith the ISO ADR Procedures. \n9.1.2. Payment Procedure. Where a Facilities Study is being conducted \npursuant to this TO Tariff, the Participating TO shall, as soon as \npracticable, tender to the Market Participant, Project Sponsor, \nProject Proponent, ISO, or identified principal beneficiaries, as the \ncase may be, a Facilities Study Agreement that defines the scope, \ncontent, assumptions, and terms of reference for such study, the \nestimated time required to complete it, and such other provisions \nas the parties may reasonably require and pursuant to which such \nMarket Participant, Project Sponsor, Project Proponent, the ISO, or \nidentified principal beneficiaries agree to reimburse the \nParticipating TO the reasonable cost of performing the required"},{"page":79,"startToken":22205,"endToken":22439,"text":"Facilities Study. If the Market Participant, Project Sponsor, Project \nProponent, the ISO, or identified principal beneficiaries, as the \ncase may be, agreeagrees to the terms of the Facilities Study \nAgreement, they shall execute the Facilities Study Agreement and \nreturn it to the Participating TO within ten Business Days. If such \nMarket Participant, Project Sponsor, Project Proponent, the ISO, or \nidentified principal beneficiary elects not to execute a Facilities \nStudy Agreement, the Participating TO shall have no obligation to \ncomplete a Facilities Study. \n.9.1.3 Facilities Study Procedures. Upon receipt of an executed Facilities \nStudy Agreement, a copy of which has been provided to the ISO \nby the party requesting the Facilities Study, the Participating TO \nwill use due diligence to complete the required Facilities Study in \naccordance with the terms of the Facilities Study Agreement. \n9.2. \nObligation to Build. \n9.2.1. Due Diligence to Construct. Subject to Section 9.3.3 of this TO \nTariff, the Participating TO shall use due diligence to construct, \nwithin a reasonable time, additions or upgrades to its transmission \nsystem that it is obligated to construct pursuant to the ISO Tariff \nand this TO Tariff. The Participating TO’s obligation to build will \nbe subject to: 1) its ability, after making a good faith effort, to \nobtain the necessary approvals and property rights under applicable \nfederal, state, and local laws; 2) the presence of a cost recovery"},{"page":80,"startToken":22439,"endToken":22661,"text":"mechanism with cost responsibility assigned in accordance with, as \napplicable, the ISO Tariff or this TO Tariff; and 3) a signed \nParticipation Agreement, if applicable. The Participating TO will \nnot construct or expand its existing or planned transmission \nsystem, if doing so would impair system reliability as determined \nthrough systems analysis based on the Applicable Reliability \nCriteria. \n9.2.2. Delay in Construction or Expansion. If any event occurs that will \nmaterially affect the time for completion of new facilities, or the \nability to complete them, the Participating TO shall promptly \nnotify: (1) the Project Sponsor with regard to facilities determined \nto be needed; (2) the Parties to the Participation Agreement with \nregard to facilities determined to be needed pursuant to the ISO \nTariff where principal beneficiaries were identified; and (3) the \nISO. In such circumstances, the Participating TO shall, within \nthirty days of notifying such Project Sponsor, Parties to the \nParticipation Agreement, and the ISO of such delays, convene a \ntechnical meeting with such Project Sponsor, Parties to the \nParticipation Agreement, and the ISO to discuss the circumstances \nwhich have arisen and evaluate any options available. The \nParticipating TO also shall make available to such Project Sponsor, \nParties to the Participation Agreement, and the ISO, as the case \nmay be, studies and work papers related to the cause and extent of"},{"page":81,"startToken":22661,"endToken":22877,"text":"the delay and the Participating TO’s ability to complete the new \nfacilities, including all information that is in the possession of the \nParticipating TO that is reasonably needed to evaluate the \nalternatives. \n9.2.2.1 \nAlternatives to the Original Facility Additions. If the \nreview process of Section 9.2.2 determines that one or \nmore alternatives exist to the originally planned \nconstruction project, the Participating TO shall present such \nalternatives for consideration to the Project Sponsor, Parties \nto the Participation Agreement, and the ISO, as the case \nmay be. If upon review of any alternatives, such Project \nSponsor, the ISO, or Parties to the Participation Agreement \nwish to evaluate or to proceed with one of the alternative \nadditions or upgrades, such Project Sponsor, the ISO, or \nParties to the Participation Agreement may request that the \nParticipating TO prepare a revised Facility Study pursuant \nto Sections 9.1.1, 9.1.2, and 9.1.3 of this TO Tariff. In the \nevent the Participating TO concludes that no reasonable \nalternative exists to the originally planned addition or \nupgrade and the Project Sponsor or Parties to the \nParticipation Agreement or the ISO disagree, the dispute \nshall be resolved pursuant to the ISO ADR Procedure. \n9.2.2.2 \nRefund Obligation for Unfinished Facility Additions. If the"},{"page":82,"startToken":22877,"endToken":23079,"text":"Participating TO and the Project Sponsor, the ISO, or \nParties to the Participation Agreement, as the case may be, \nmutually agree that no other reasonable alternatives exist, \nthe obligation to construct the requested additions or \nupgrades shall terminate and any deposit not yet applied \ntoward the expended project costs shall be returned with \ninterest pursuant to FERC Regulation 35.19(a)(2)(iii). \nHowever, the Project Sponsor and any identified principal \nbeneficiaries, as the case may be, shall be responsible for \nall costs prudently incurred by the Participating TO through \nthe time the construction was suspended. \n9.3. \nProvisions Relating to Transmission Construction on the Systems of Other \nTOs. \n9.3.1 Responsibility for Third Party Additions. A Participating TO shall \nnot be responsible for making arrangements for any engineering, \npermitting, and construction of transmission or distribution \nfacilities on the system(s) of any other entity or for obtaining any \nregulatory approval for such facilities. The Participating TO will \nundertake reasonable efforts through the coordinated planning \nprocess to assist in making such arrangements, including, without \nlimitation, providing any information or data required by such \nother electric system pursuant to Good Utility Practice. \n9.3.2. Coordination of Third-Party System Additions. Where transmission"},{"page":83,"startToken":23079,"endToken":23314,"text":"additions or upgrades being built pursuant to the ISO Tariff require \nadditions or upgrades on other systems, to the extent consistent with \nSection 9.3.3 of this TO Tariff, the Participating TO shall coordinate \nconstruction on its own system with the construction required by \nothers. The Participating TO, after consultation with the ISO, the \nProject Sponsor, and Parties to the Participation Agreement, as the \ncase may be, may defer construction if the new transmission \nfacilities on another system cannot be completed in a timely manner. \nThe Participating TO shall notify such Project Sponsor, Parties to \nthe Participation Agreement, and the ISO, in writing of the basis for \nany decision to defer construction and the specific problems which \nmust be resolved before it will initiate or resume construction of the \nnew facilities. Within forty Business Days of receiving written \nnotification by the Participating TO of its intent to defer construction \npursuant to this section, such Project Sponsor, Parties to the \nParticipation Agreement, or the ISO may challenge the decision in \naccordance with the ISO ADR Procedure. \n9.3.3. Expansion \nby \n“Local \nFurnishing \nParticipating \nTO’s”. \nNotwithstanding any other provision of this TO Tariff, prior to \nrequesting that a Local Furnishing Participating TO construct or \nexpand facilities, or utilize existing facilities, the ISO or, Project \nSponsor, and/or Eligible Customer if necessary as determined by the \nLocal Furnishing Participating TO, shall tender (or cause to be"},{"page":84,"startToken":23314,"endToken":23474,"text":"tendered) an application under Section 211 of the FPA requesting \nFERC to issue an order directing the Local Furnishing Participating \nTO to construct or expand facilities as necessary to provide \nInterconnection or transmission service as determined pursuant to \nthe ISO Tariff. Such Local Furnishing Participating TO shall \nthereafter, within ten Business Days of receiving a copy of the \nSection 211 application, waive its right to a request for service under \nSection 213(a) of the FPA and to the issuance of a proposed order \nunder Section 212(c) of the FPA. Upon receipt of a final order from \nFERC under Section 211 of the FPA that is no longer subject to \nrehearing or appeal, such Local Furnishing Participating TO shall \nconstruct or expand facilities, or permit the utilization of existing \nfacilities, to comply with that FERC order and shall transfer to the \nISO Operational Control over the Local Furnishing Participating \nTO’s expanded transmission facilities in accordance with the ISO \nTariff."},{"page":85,"startToken":23474,"endToken":23479,"text":"SECTION 10 INTERCONNECTION \nPROCESS - REDLINES"},{"page":86,"startToken":23479,"endToken":23715,"text":"10.\nInterconnection Process.\n10.1. Applicability. All requests for Interconnection directly to the ISO\nControlled Grid from parties eligible to request such Interconnection \nconsistent with Section 210(a) of the FPA shall be processed pursuant to \nthe applicable provisions of this Section 10. \n10.2. Applications.10.2. \nApplications. SDG&E accepts applications on a \nrolling basis and the application process is administered as described in \nthis Section 10. Except as provided in Section 10.2.1, a party requesting \nInterconnection shall submit written Interconnection Applications which \nprovidesprovide the information required in Section 10.3Attachment B to \nthe Participating TO TO’s Study Agreement and described in Section 10.5 \nof this TO Tariff. The Interconnection Application shall sendinclude a copy \nof the$50,000 non-refundable application to the ISOfee. The Participating \nTO shall time-stamp the application to establish study priority. \n10.2.110.3. \nScoping Meeting. Following receipt by Transmission Owner of the \napplication fee, the Transmission Owner or the Interconnection Customer \nmay request a Scoping Meeting prior to commencement of the System \nImpact Study, provided that the Interconnection Application contains \nsufficient information to conduct the Scoping Meeting. \n10.4. New Facility Operator. If the party requesting Interconnection to the ISO \nControlled Grid is a New Facility Operator, such party shall submit a \nwritten Interconnection Application to the ISO pursuant to Section \n5.7.3applicable sections of the ISO Tariff that shall include, but shall not"},{"page":87,"startToken":23715,"endToken":23889,"text":"be limited to, as applicable, the information required in Section 10.35 of \nthis TO Tariff. \n10.35. Completed Interconnection Application. A Completed Interconnection \nApplication shall provide, where applicable, all of the information listed in \n18 CFR § 2.20, includingand such additional information as the TO \nreasonably requires to process Interconnection Customer’s application.  \nThe information provided shall include, but is not limited to, the \nfollowing: \n(i)\nThe identity, address, telephone number, and facsimilee-mail\nnumber of the party requesting Interconnection;\n(ii)\nThe Interconnection point(s) to the ISO Controlled Grid\ncontemplatedproposed by the applicant;\n(iii)\nThe resultant (or new) maximum amount of Interconnection\ncapacity;\n(iv)\nThe proposed date for energizing the Interconnection and the\nterm of the Interconnection service;\n(v)\nIf the applicant is a New Facility Operator, completed\ngenerator data sheets pursuant to the requirements of the\nParticipating TO.; and,\n(vi)\nSuch other information as the Participating TO reasonably\nrequires to process the application. In addition to the\ninformation specified above, the following information may\nalso be provided in order to properly evaluate system"},{"page":88,"startToken":23889,"endToken":24075,"text":"conditions. \n(vii)\nIf the applicant is a wholesale load, (including ECLL), the\nelectrical of the source of the power (if known) to be\ntransmitted pursuant to the applicant’s request for\nInterconnection. If the source of the power is not known, a\nsystem sale will be assumed; and\n(viii)\nThe electrical location of the ultimate load (if known). If the\nlocation of the load is not known, a system sale will be\nassumed.; and\n(ix)\nIf the applicant is an ECLL, the applicant shall submit the data\nrequired by the Participating TO and CAISO, as specified in \nthe System Impact Study Data Template Submittal Form, \nincluding applicable facility characteristics, load composition \nand expected hourly operating profile, MW capacity, minimum \nand maximum operating levels, electrical and dynamic model \ndata, voltage and frequency ride-through characteristics, \nprotection and control settings, load reconnection behavior, \nexpected CAISO market participation model (if any), \ncurtailment and ramping capabilities, and behind-the-meter \ngeneration capacity and characteristics (if any); and \n(x)\nDocumentation demonstrating that the Large Load to be served\nby the ECLL has Site Control; and \n(xi)\nIf the Large Load will be co-located with generation,"},{"page":89,"startToken":24075,"endToken":24269,"text":"information concerning the relevant generation must be \nprovided by the ECLL.  Such information shall include the \nexecuted generator interconnection agreement or, if none \nexists, an identifying queue number that will allow the TO to \nverify that generator has submitted an interconnection \napplication; and \n(xii) \nIf the applicant is an ECLL, disclosure of whether any \nsubstantially similar interconnection requests on behalf of the \nsame Large Load have been submitted outside of the \nParticipating TO service area; and \n(xiii) If the applicant is an ECLL, whether it is requesting FILI \nservice. \nIn addition, if the applicant proposes to perform or cause a \nthird party to perform any required System Impact Study or any \nrequired Facilities Study, it shall so indicate in its Interconnection \nApplication. The results of any study or studies performed by a New \nFacility Operatoran Eligible Customer must be approved and/or \nconcurred by botheach of the ISO and the Participating TO, as \napplicable. Within 10 Business Days after receipt of an \nInterconnection Application, the Participating TO, and the ISO, if \napplicable, shall determine whether the application is complete \n(“Completed Interconnection Application”). Wherever possible, the \nParticipating TO will attempt to remedy deficiencies in the"},{"page":90,"startToken":24269,"endToken":24507,"text":"Interconnection Application through informal communications with \nthe applicant. If such efforts are unsuccessful, the Participating TO \nshall return the Interconnection Application to the applicant or to the \nISO if the applicant is a New Facility Operator. The Participating TO \nwill treat the information provided in the Interconnection Application, \nincluding the applicant’s identity, as confidential at the request of the \napplicant except to the extent that disclosure of this information is \nrequired by this TO Tariff, by regulatory or judicial order, for \nreliability purposes pursuant to Good Utility Practice, or pursuant to \nRTG or ISO transmission information sharing agreements. The \nParticipating TO shall treat this information consistent with the \nstandards of conduct contained in Part 37 of FERC’s regulations. \n10.3.1  Amendment to Completed Interconnection Application. An applicant shall \nonly be limited to amending its Completed Interconnection Application \nonce. 10.6 \nSite Control Requirements: Demonstration of no less than \nninety percent (90%) Site Control; or (1) a signed affidavit from an officer \nof the company indicating that Site Control is unobtainable due to \nregulatory limitations as defined by Participating TO on its public website; \n(2) documentation sufficiently describing and explaining the source and\neffects of such regulatory limitations, including a description of any \nconditions that must be met to satisfy the regulatory limitations and the \nanticipated time by which the Interconnection Customer expects to satisfy \nthe regulatory requirements; and (3) a deposit in lieu of Site Control of"},{"page":91,"startToken":24507,"endToken":24740,"text":"$10,000 per MW, subject to a minimum of $500,000 and a maximum of \n$2,000,000. Interconnection Requests from multiple Interconnection \nCustomers for multiple Projects that share a site must include a contract or \nother agreement that allows for shared land use. If the Project no longer \nsatisfies the applicable Site Control requirements, the Participating TO \nmay provide the Interconnection Customer an opportunity to cure the \ndeficiency within ten (10) Business Days to demonstrate satisfaction with \nthe applicable requirement subject to Participating TO’s approval. Absent \nsuch approval, the Participating TO shall deem the Interconnection \nRequest withdrawn. \nAn Interconnection Customer that submits a deposit in lieu of Site Control \ndue to demonstrated regulatory limitations must demonstrate that it is \ntaking identifiable steps to secure the necessary regulatory approvals from \nthe applicable federal, state, and/or tribal entities no later than the \ncompletion of the System Impact Study. An Interconnection Customer \nfacing qualifying regulatory limitations must demonstrate one hundred \npercent (100%) Site Control within one hundred eighty (180) Calendar \nDays of the effective date of the Interconnection Agreement. Participating \nTO shall deposit all Site Control deposits in an interest-bearing account at \na bank or financial institution designated by the Participating TO. The Site \nControl Deposit shall be refundable to Interconnection Customer at any \ntime upon demonstration of one hundred percent (100%) Site Control or \nthe Interconnection Request is withdrawn by Interconnection Customer or"},{"page":92,"startToken":24740,"endToken":24928,"text":"deemed withdrawn by the Participating TO by written notice. The refund \nof the Site Control deposit shall include interest from the date of receipt by \nthe Participating TO to the date of payment to Interconnection Customer. \nThe applicable interest shall be computed in accordance with the FERC’s \nregulations at 18 CFR § 35.19a(a)(2)(iii). The Site Control deposit shall \ncontinue to be required after Interconnection Customer either executes an \nInterconnection Agreement or requests the filing of an unexecuted \nInterconnection Agreement under this TO tariff if Site Control has not \nbeen demonstrated. \n10.7  Amendment to Completed Interconnection Application. An applicant shall \nbe limited to amending its Completed Interconnection Application once. \nModifications permitted under this Section shall include specifically:  \ni.\na decrease in interconnection service capacity size\n(MW/MVA); \nii.\nmodifying the technical parameters associated with the\nProject technology or the Project step-up transformer \nimpedance characteristics Changes; \niii.\nmodifying the interconnection configuration;\niv.\nmodifying the in-service date or Commercial Operation\nDate, subject to the approval of the Participating TO, which \napproval shall not be unreasonably withheld. \nSuch amendment shall occur on or before ten (10) Business Days"},{"page":93,"startToken":24928,"endToken":25151,"text":"following the date the Participating TO tenders anystarts the Facilities \nStudy Agreement. Specifically, as an alternative to executing and \nreturning Facilities Study Agreement, a New Facility OperatorEligible \nCustomer may submit an amendment to its Completed Interconnection \nApplication to reflect a revised configuration for its New Facility.Project.  \nThe amended Completed Interconnection Application shall be treated in \naccordance with Section 5.7.4.2.1applicable sections of the ISO Tariff and \nSection 10.7 of this TO Tariff, the New Facility Operator’sas applicable, \nand the Eligible Customer’s Completed Interconnection Application shall \nnot be deemed withdrawn; and the New Facility Operator.  Eligible \nCustomer shall maintain its existing queue position, only if (a) the \namended Completed Interconnection Application is received by the \nParticipating TO within ten (10) Business Days of the Participating TO’s \ntenderstart of a Facilities Study Agreement; and (b) the New Facility \nOperatorEligible Customer has not submitted a previous amendment to the \nCompleted Interconnection Application.  In the event a New Facility \nOperatoran Eligible Customer amends its Completed Interconnection \nApplication, it will be responsible for any additional study costs that result \nfrom that amendment, including costs associated with revisions to studies \nfor other applicants holding later queue positions. \n10.48 Review of Completed Interconnection AgreementApplication. After \nreceiving a Completed Interconnection Application, the Participating TO, \nand the ISO, if applicable, will determine on a non-discriminatory basis"},{"page":94,"startToken":25151,"endToken":25395,"text":"whether a System Impact Study is required. Whenever the Participating \nTO, and the ISO, if applicable, determines that a System Impact Study is \nnot required and that neither Reliability Upgrades nor changes in existing \noperating procedures are required, the Participating TO shall notify the \napplicant within fifteen (15) Business Days of the Completed Application \nDate. If the Interconnection can be accommodated without any Direct \nAssignment Facilities, within thirty (30) Business Days of such notice \nfrom the Participating TO, the applicant shall request the Participating TO \nto tender to the applicant an Interconnection Agreement. Within twenty \n(20) Business Days of such request, the Participating TO shall tender to \nthe applicant an Interconnection Agreement as provided in Section 8.1.3. \nof this TO Tariff.  If the Participating TO determines, upon the review of \nthe Completed Interconnection Application, that Direct Assignment \nFacilities are required, the Participating TO shall tender to the applicant a \nFacilities Study Agreement within twenty (20) Business Days of the \nCompleted Application Date and continue the Interconnection process \npursuant to Section 10.810 of this TO Tariff. \n10.5 \nNotice of Need for System Impact Study. If the Participating TO, and the \nISO, if applicable, determines10.9 \nStudy Deposits. The Participating \nTO shall perform interconnection studies in accordance with the terms of a \nStudy Agreement executed pursuant to Section 10.10 below; provided, \nhowever, that the performance of such studies is conditioned upon the \nInterconnection Customer’s timely provision of study deposits required in"},{"page":95,"startToken":25395,"endToken":25646,"text":"the Study Agreement.  The Participating TO shall return to the Eligible \nCustomer any deposited funds remaining after completion of the studies. \nUpon the Participating TO’s determination that the deposited funds will \nnot be sufficient to complete one or more of the studies, the Participating \nTO may request that additional funds be deposited and the Interconnection \nCustomer shall promptly provide such additional deposit. \n10.10 Notice of Need for System Impact Study. If the Participating TO and/or \nthe ISO, as applicable, determine(s) that a System Impact Study is \nnecessary to accommodate the requested Interconnection, the Participating \nTO shall so inform the applicant as soon as practicable. In such cases, the \nParticipating TO shall within twenty (20) Business Days of receipt of a \nCompleted Interconnection Application, tender a System Impact Study \nAgreement that defines the scope, content, assumptions and terms of \nreference for such study to be completed by the Participating TO; the \nestimated time required to complete it; and such other provisions as the \nparties may reasonably require, and pursuant to which the applicant shall \nagree to reimburse the Participating TO for the reasonable actual costs of \nperforming or reviewing the required System Impact Study. A description \nof the Participating TO’s transmission assessment practices for completing \na System Impact Study is provided in the Participating TO’s FERC Form \n715. Alternatively, if the New Facility Operator will perform the System\nImpact Study, the Participating TO shall within twenty (20) Business Days \nof receipt of a Completed Interconnection Application, tender a System"},{"page":96,"startToken":25646,"endToken":25889,"text":"Impact Study Agreement that defines the scope, content, assumptions and \nterms of reference for such study to be reviewed by the Participating TO; \nthe estimated time required to complete it; and such other provisions as the \nparties may reasonably require, and pursuant to which the applicant shall \nagree to reimburse the Participating TO for the reasonable actual costs of \nreviewing the required System Impact Study. For an \nInterconnectioninterconnection request to remain a Completed \nInterconnection Application, the applicant shall execute the System \nImpact Study Agreement and return it to the Participating TO within ten \n(10) Business Days together with payment for the reasonable estimated \ncost of the System Impact Study or reviewing the New Facility Operator’s \nSystem Impact Study. Alternatively, if the applicant requests the \nParticipating TO to proceed with the System Impact Study or review \nthereof and commits to abide by the terms, conditions, and cost \nassignments ultimately determined under the ISO ADR Procedures, \nincluding any determination by FERC or appeal of a FERC determination \nin accordance with that process, the Participating TO shall promptly \nproceed with the System Impact Study provided that such request is \naccompanied by payment for the reasonable estimated cost of the System \nImpact Study, and the parties shall submit the disputed terms for \nresolution under the ISO’s ADR Procedures. If the applicant elects not to \nexecute a System Impact Study Agreement, and does not request that the \nParticipating TO proceed with the System Impact Study or review thereof,"},{"page":97,"startToken":25889,"endToken":26110,"text":"its application shall be deemed withdrawn, and the applicant shall \nreimburse to the Participating TO all costs reasonably incurred in \nprocessing the application. \n10.611 System Impact Study Cost Reimbursement. \n10.611.1 \nCost Reimbursement. The System Impact Study Agreement \nshall clearly specify the charge, based on the Participating TO’s \nestimate of the cost and time for completion of the System Impact \nStudy. The charge shall not exceed the reasonable actual cost of \nthe study. In performing the System Impact Study, the \nParticipating TO shall rely, to the extent reasonably practicable, on \nexisting transmission planning studies. The applicant will not be \nassessed a charge for such existing studies; however, the applicant \nwill be responsible for the reasonable charges associated with any \nmodifications to existing planning studies that are reasonably \nnecessary to evaluate the impact of the applicant’s request. \n10.69.2 \nMultiple Parties. If multiple parties request Interconnection \nat the same location, the Participating TO may conduct a single \nSystem Impact Study. The costs of that study shall be pro-rated \namong the parties requesting Interconnection. \n10.712 System Impact Study Procedures. Upon receipt of an executed System \nImpact Study Agreement or initiation of the ISO ADR Procedures and \nreceipt of payment for estimated study costs, the Participating TO will use \ndue diligence to either (a) complete the required System Impact Study"},{"page":98,"startToken":26110,"endToken":26363,"text":"within a sixty (60) day period or (b) complete its review of a New Facility \nOperator’san Eligible Customer’s System Impact Study within thirty (30) \nCalendar Days of its receipt of the completed study. The System Impact \nStudy will identity whether any Direct Assignment Facilities or Reliability \nUpgrades as well as, if applicable, any Delivery Upgrades are necessary to \ndeliver a New Facility’s full output over the ISO Controlled Grid. The \nSystem Impact Study will also identify any adverse impact on \nEncumbrances existing as of the applicant’s New Facility \nOperator’sEligible Customer’s Completed Application Date. In the event \nthat the Participating TO is unable to complete the required System Impact \nStudy within such time period, it shall so notify the applicant, in writing, \nand provide an estimated completion date along with an explanation of the \nreasons why additional time is required to complete the required studies. A \ncopy of the completed System Impact Study and related work papers shall \nbe made available to the applicant and the ISO. The Participating TO will \nuse the same due diligence in completing the System Impact Study for \nothers as it uses when completing studies for its affiliateditself as UDC. \nThe Participating TO shall notify the applicant and the ISO immediately \nupon completion of the System Impact Study.  The Participating TO may, \nusing Good Utility Practice and reasonable engineering judgment, defer \ncommencement of a System Impact Study if the study cannot be \nmeaningfully completed until results are available for other similarly \nsituated or electrically related interconnection requests. The Participating"},{"page":99,"startToken":26363,"endToken":26583,"text":"TO shall notify the applicant of any such deferral. \n10.712.1 \nProcedures Upon Completion of System Impact Study. \nWithin fifteen (15) Business Days of completion of the System \nImpact Study or review and approval of a New Facility Operator’s \nSystem Impact Study, the Participating TO shall notify the \napplicant whether the transmission system will be adequate to \naccommodate all of a request for Interconnection. If no costs are \nlikely to be incurred for any Direct Assignment Facilities, any \nReliability Upgrades, or implementing any operating procedures, \nthen within thirty (30) Business Days of receipt of the completed \nSystem Impact Study performed by the Participating TO or receipt \nof written approval of the New Facility Operator’s System Impact \nStudy from the Participating TO and the ISO, the applicant shall \nrequest the Participating TO to tender an Interconnection \nAgreement. Within twenty (20) Business Days of such request, the \nParticipating TO shall tender to the applicant an Interconnection \nAgreement as provided in Section 8.1.3. If costs are likely to be \nincurred to accommodate a request for Interconnection, then the \napplicant shall request the Participating TO shall tender to the \napplicant perform a Facilities Study Agreement pursuant to Section \n10.8. \n10.810.12.2 \nRestudy. The Participating TO may perform a restudy if the \nwithdrawal or modification of a higher-queued Interconnection"},{"page":100,"startToken":26583,"endToken":26818,"text":"Request materially affects the results of a completed System \nImpact Study.  The affected Interconnection Customer shall be \nresponsible for the reasonable actual cost of the restudy. \n10.13 Notice of Need for Facilities Study. If a System Impact Study indicates \nthat additions or upgrades to the ISO Controlled Grid are needed to satisfy \nan applicant’s request for Interconnection, the Participating \nTOInterconnection Customer shall, within fifteen (15) Business Days of \nthe completion date of the System Impact Study, or the completion of \nreview and approval of the New Facility Operator’s System Impact Study \nby the Participating TO and the ISO, tender to the applicant a Facilities \nStudy Agreement that defines the scope, content, assumptions and terms \nof reference for such study to be completed by the Participating TO; the \nestimated time required to complete the required study; and such other \nprovisions as the parties may reasonably require, and pursuant to which \nthe applicant agrees torequest that the Participating TO to initiate the \nFacilities Study pursuant to the Study Agreement. In evaluating mitigation \nmeasures, the Participating TO shall consider, as appropriate, alternative \ntransmission technologies consistent with applicable reliability \nrequirements and Good Utility Practice.  The applicant shall reimburse \nthe Participating TO for the reasonable actual costs of performing the \nrequired Facilities Study. in accordance with the Study Agreement. \nAlternatively, if thea New Facility Operator will perform the Facilities \nStudy, the Participating TONew Facility Operator shall within fifteen (15)"},{"page":101,"startToken":26818,"endToken":27062,"text":"Business Days of the completion date of the System Impact Study or the \ncompletion of the Participating TO’s and ISO’s review and/or approval of \nthe New Facility Operator’s System Impact Study, tenderintiate a \nFacilities Study Agreement that defines the scope, content, assumptions \nand term of reference for such study to be reviewed by the Participating \nTO; and the ISO. The Study Agreement shall reflect the estimated time \nrequired to complete the requiredsuch review; and such, other provisions \nas the parties may reasonably require, and pursuant to which the applicant \nagreesthe applicant’s obligation to reimburse the Participating TO for the \nreasonable actual cost of reviewing the required Facilities Study. For an \nInterconnection request to remain a Completed Interconnection \nApplication, following the applicant’s election to proceed with the \nFacilities Study, the applicant shall maintain and execute the Facilities \nStudy Agreement and return it to the Participating TO within ten (10) \nBusiness Days together with payment for the reasonable estimated cost of \nthe Facilities Study or reviewing the New Facility Operator’s Facilities \nStudy., as applicable. Alternatively, if the applicant requests the \nParticipating TO to proceed with the Facilities Study or review thereof and \ncommits to abide by the terms, conditions, and cost assignments ultimately \ndetermined under the ISO ADR Procedures, including any determination \nby FERC or appeal of a FERC determination in accordance with that \nprocess, the Participating TO shall promptly proceed with the Facilities \nStudy provided that such request is accompanied by payment for the"},{"page":102,"startToken":27062,"endToken":27313,"text":"reasonable estimated cost of the Facilities Study, and the parties shall \nsubmit the disputed terms for resolution under the ISO ADR Procedures. \nIf the applicant elects not to execute a Facilities Study Agreement and \ndoes not request that the Participating TO proceed with the Facilities \nStudy, its application shall be deemed withdrawn and the applicant shall \nreimburse to the Participating TO all costs reasonably incurred in \nprocessing the application not covered by the System Impact Study \nAgreement. \n10.914 Facilities Study Procedure. Upon receipt of an executedthe applicant’s \nrequest to proceed with the Facilities Study and payment of the required \ndeposit pursuant to the Study Agreement, or initiation of the ISO ADR \nProcedures and receipt of payment for the estimated study costs, the \nParticipating TO will use due diligence to either (a) complete the required \nFacilities Study within a sixty (60) Calendar day period or (b) complete its \nreview of a New Facility Operator’s Facilities Study within thirty (30) \nCalendar Days of its receipt of the completed study. In the event that the \nParticipating TO is unable to complete the required Facilities Study within \nsuch time period, it shall so notify the applicant, in writing, and provide an \nestimated completion date along with an explanation of the reasons why \nadditional time is required to complete the required studies. A copy of the \ncompleted Facilities Study shall be made available to the applicant. \n10.9.1 Execution of Interconnection Agreement.10.15 \nElectromagnetic \nTransient Study. If the Participating TO determines that an"},{"page":103,"startToken":27313,"endToken":27546,"text":"Electromagnetic Transient (“EMT”) Study is required, it shall notify the \napplicant of the estimated cost and time required to complete the study. \nWithin ten (10) Business Days of such notice, the applicant shall request \nthat the Participating TO proceed with the EMT Study and provide \npayment of the reasonable estimated study cost pursuant to the Study \nAgreement. The EMT Study may be performed at any time after \ncompletion of the Facilities Study, as determined by the Participating TO. \nThe Participating TO will use due diligence to complete the EMT Study \nwithin the estimated timeframe and provide the completed study to the \napplicant. \n10.16 No Preferential Treatment.  The Participating TO will use the same due \ndiligence in completing studies under this tariff for others as it uses for \nitself or its affiliates. \n10.17 Tender of Interconnection Agreement. Within thirty (30) Business Days of \nreceipt of the completed Facilities Study performed by the Participating \nTO or receipt of written approval of the New Facility Operator’s or \nEligible Customer’s Facilities Study from the Participating TO, the \napplicant shall request the Participating TO to tender an Interconnection \nAgreement. Within twenty (20) Business Days of such request, the \nParticipating TO shall tender to applicant an Interconnection Agreement \nas provided in Section 8.1.3. \n10.1018 \nPartial Interim Service for Eligible Customers other than ECLL. If \nthe Participating TO determines that there will not be adequate"},{"page":104,"startToken":27546,"endToken":27785,"text":"transmission capability to satisfy fully the full amountservice requested in \na Completed Interconnection Application for Eligible Customers other \nthan ECLL, the Participating TO nonetheless shall be obligated to offer \nand provide the portion of the requested Interconnection that can be \naccommodated without any additional Direct Assignment Facilities or \nReliability Upgrades. However, the Participating TO shall not be obligated \nto provide the incremental amount of requested Interconnection that \nrequires such additional facilities or upgrades to the transmission system \nuntil such facilities or upgrades have been placed in service. \n10.1119 \nExpedited Interconnection Procedures. In lieu of the procedures set \nforth above, the applicant shall have the option to expedite the processing \nof its Completed Interconnection Application. In order to exercise this \noption, the applicant shall submit in writing a Request for Expedited \nInterconnection Procedures to the Participating TO, and to the ISO, if the \napplicant is a New Facility Operator, within ten (10) Business Days after \nreceiving a copy of the System Impact Study for the proposed \nInterconnection. Within ten (10) Business Days after receiving a Request \nfor Expedited Procedures, the Participating TO shall tender an Expedited \nInterconnection Agreement that requires the applicant to compensate the \nParticipating TO for all costs reasonably incurred pursuant to the terms of \nthis TO Tariff for processing the Completed Interconnection Application \nand providing the requested Interconnection. While the Participating TO \nagrees to provide the applicant with its best estimate of the costs of any"},{"page":105,"startToken":27785,"endToken":28029,"text":"needed Direct Assignment Facilities and, if applicable, Reliability \nUpgrades and other charges that may be incurred, unless otherwise agreed \nby the parties, such estimate shall not be binding and the applicant must \nagree in writing to compensate the Participating TO for all actual \ninterconnection costs reasonably incurred pursuant to the provisions of \nthis TO Tariff. The applicant shall execute and return such Expedited \nInterconnection Agreement within ten (10) Business Days of its receipt or \nthe applicant’s request for Interconnection will cease to be a Completed \nInterconnection Application and will be deemed terminated and \nwithdrawn. In that event, the applicant shall reimburse the Participating \nTO for all costs reasonably incurred in processing the application not \ncovered by the terms of the System Impact Study Agreement.Study \nAgreement. \n10.20 Flexible Interim Load Interconnection (“FILI”) Service For ECLL.  If the \nECLL is requesting FILI Service, the TO shall perform, as part of the \nSystem Impact Study, an analysis and determine the portion of the \nECLL’s maximum operating level that may be energized prior to such \ntime that all network upgrades necessary for full energization of the \nstudied loads are in service.  The portion that may be energized will be \ndocumented in the executed and effective Interconnection Agreement.   \n \nPursuant to Section 25.7.1 of the ISO Tariff, the ECLL may be required to \nexecute an agreement with the ISO and TO if real-time operating \nprocedures are necessary to effectuate the limit determined by the TO in"},{"page":106,"startToken":28029,"endToken":28245,"text":"this Section 10.20.  Such agreement will describe the circumstances in \nwhich the Large Load may be temporarily curtailed and the mechanism \nused to perform the curtailment.  \n10.21 Conditions Related to FILI Service For ECLL. \n10.21.1 \nFILI Service Reliability Requirements. The Participating \nTO shall have sole discretion to specify the protection, control \nsystems and any other equipment necessary to ensure the Large \nLoad does not withdraw more power from the ISO Controlled Grid \nthan allowed by the limit established pursuant to Section 10.20.  \nThe required protection, control systems and other equipment; and \nthe party responsible for installing, owning and maintaining those \nsystems and equipment; will be identified in the Interconnection \nAgreement.  FILI Service shall not commence until the \ninstallation and commissioning of all systems and equipment \nidentified in the Interconnection Agreement has been completed. \n10.21.2 \nCurtailment of FILI Service.  The TO and ISO may curtail \nFILI Service as necessary to maintain the safe and reliable \noperation of the ISO Controlled Grid, including during normal \noperating conditions. \n10.21.3 \nExceedance of Authorized FILI Service.  The TO shall \nhave the right to disconnect service to the ECLL in the event that \nwithdrawals from the ISO Controlled Grid exceed the limit \nestablished pursuant to Section 10.20. The TO shall follow Good"},{"page":107,"startToken":28245,"endToken":28492,"text":"Utility Practice in carrying out any such disconnection and \nsubsequent reconnection.    \n10.22 Co-Located Generation Units and Large Loads. ECLL for a Co-Located \nLarge Load connecting to facilities of an exporting Generating Facilities \nwill be subject to this Section 10.22.  The CAISO and the Participating \nTO will publish study results reflecting the combined presence of the \nGenerating Units and co-located Large Loads.  The CAISO and SDG&E \nwill memorialize the result of such studies in a Large Generation \nInterconnection Agreement (LGIA) with the New Facility Operator.  For \nclarity, the New Facility Operator may be the same legal entity as either \nthe ECLL or the Large Load, but not both.  The Participating TO’s \nSystem Impact Study shall consider co-located generation to the extent it \ndoes not export power to the ISO Controlled Grid.  Any requested export \nservice shall be addressed under the applicable generator interconnection \nprocedures of the ISO Tariff.  \nIn the event of a conflict between the CAISO Tariff and this TO \nTariff pertaining to the interconnection of the Generating Unit, the CAISO \nTariff shall control.  In the event of a conflict between the CAISO Tariff \nand this TO Tariff pertaining to the interconnection of an ECLL, this TO \nTariff shall control.  Nothing in the CAISO Tariff shall be interpreted to \ncontradict or exempt an ECLL from its cost responsibility obligations \npursuant to this TO Tariff, and nothing in this TO Tariff shall be \ninterpreted to contradict or exempt a New Facility Operator from its cost"},{"page":108,"startToken":28492,"endToken":28549,"text":"responsibility obligations pursuant to the CAISO Tariff.     \n10.23 Effect of Default Under Interconnection Agreement.  Interconnection \nCustomer shall forfeit its queue position and its Completed \nInterconnection Application shall be deemed withdrawn with respect to \nany Project as to which Interconnection Customer is in default under the \napplicable Interconnection Agreement, including without limitation failure \nto provide required security."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":282,"startToken":0,"endToken":892},{"p":3,"at":282,"title":"I. BACKGROUND","method":"printed heading","endPage":3,"endAt":300,"startToken":892,"endToken":894},{"p":3,"at":300,"title":"A. SDG&E and Its TO Tariff","method":"printed heading","endPage":3,"endAt":1519,"startToken":894,"endToken":1075},{"p":3,"at":1519,"title":"B. The Show Cause Order","method":"printed heading","endPage":4,"endAt":651,"startToken":1075,"endToken":1364},{"p":4,"at":651,"title":"II. PROPOSED INTERCONNECTION PROCESS REFORMS","method":"printed heading","endPage":5,"endAt":880,"startToken":1364,"endToken":1909},{"p":5,"at":880,"title":"A. Definition of Large Load","method":"printed heading","endPage":5,"endAt":3130,"startToken":1909,"endToken":2278},{"p":5,"at":3130,"title":"B. Application Process","method":"printed heading","endPage":9,"endAt":2191,"startToken":2278,"endToken":4125},{"p":9,"at":2191,"title":"C. Transmission Service Study","method":"printed heading","endPage":11,"endAt":2418,"startToken":4125,"endToken":5235},{"p":11,"at":2418,"title":"D. Stakeholder Access to Information on Large Load Interconnections","method":"printed heading","endPage":12,"endAt":1271,"startToken":5235,"endToken":5589},{"p":12,"at":1271,"title":"E. Cost Shifting Among Transmission Customers","method":"printed heading","endPage":18,"endAt":63,"startToken":5589,"endToken":8207},{"p":18,"at":63,"title":"III. FLEXIBLE LARGE LOADS AND FLEXIBLE INTERIM LOAD","method":"printed heading","endPage":19,"endAt":2926,"startToken":8207,"endToken":9154},{"p":19,"at":2926,"title":"IV. CO-LOCATED LARGE LOADS","method":"printed heading","endPage":20,"endAt":680,"startToken":9154,"endToken":9349},{"p":20,"at":680,"title":"V. GRID ENHANCING TECHNOLOGIES","method":"printed heading","endPage":21,"endAt":246,"startToken":9349,"endToken":9747},{"p":21,"at":246,"title":"VI. BRIEFING QUESTIONS","method":"printed heading","endPage":21,"endAt":383,"startToken":9747,"endToken":9766},{"p":21,"at":383,"title":"A. Existing Commercial Arrangements","method":"printed heading","endPage":21,"endAt":1271,"startToken":9766,"endToken":9905},{"p":21,"at":1271,"title":"B. Planning Impacts from Flexible Services for Large Loads","method":"printed heading","endPage":22,"endAt":1610,"startToken":9905,"endToken":10313},{"p":22,"at":1610,"title":"C. Structures to Prevent Cost Shifts","method":"printed heading","endPage":23,"endAt":198,"startToken":10313,"endToken":10586},{"p":23,"at":198,"title":"VII. ISSUES TO BE ADDRESSED THROUGH THE CAISO TARIFF","method":"printed heading","endPage":23,"endAt":1719,"startToken":10586,"endToken":10794},{"p":23,"at":1719,"title":"VIII. CONFORMING AND MINISTERIAL REVISIONS","method":"printed heading","endPage":24,"endAt":1653,"startToken":10794,"endToken":11227},{"p":24,"at":1653,"title":"IX. ENCLOSURES","method":"printed heading","endPage":24,"endAt":2215,"startToken":11227,"endToken":11315},{"p":24,"at":2215,"title":"X. EFFECTIVE DATE","method":"printed heading","endPage":25,"endAt":172,"startToken":11315,"endToken":11478},{"p":25,"at":172,"title":"XI. REQUEST FOR WAIVER","method":"printed heading","endPage":25,"endAt":415,"startToken":11478,"endToken":11515},{"p":25,"at":415,"title":"XII. COMMUNICATIONS","method":"printed heading","endPage":25,"endAt":949,"startToken":11515,"endToken":11584},{"p":25,"at":949,"title":"XIII. SERVICE","method":"printed heading","endPage":25,"endAt":1037,"startToken":11584,"endToken":11601},{"p":25,"at":1037,"title":"XIV. CONCLUSION","method":"printed heading","endPage":26,"endAt":0,"startToken":11601,"endToken":11700},{"p":26,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":108,"endAt":448,"startToken":11700,"endToken":28549}]}
