{"document":{"slug":"rec-20261116-5329","title":"Revisions to TO Tariff to Provide for Large Load Interconnection","issued":"2026-11-16","accession":"20261116-5329","docket":"ER27-528-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"LS Power Grid California, LLC","kind":"tariff filing","file":"sources/filings/text/20261116-5329_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5329","tier":"record","sha256":"2d3d454def2e95c1881f0bd05f5077ca113f8066651bad80a224b03e1d9a99f4","pages":387,"tokens":132691,"emptyPages":[],"textThemes":["study","cost","credit","flex"]},"pages":[{"page":1,"startToken":0,"endToken":426,"text":"Josh R. Robichaud \nAssociate \nT:+1.202.828.1731             F: +1.800.404.3970 \n2001 M Street NW, Suite 900, Washington,DC 20036-3310 \njosh.robichaud@bracewell.com            bracewell.com \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nNovember 16, 2026 \nVIA ETARIFF \nThe Honorable Debbie-Anne A. Reese \nSecretary \nFederal Energy Regulatory Commission \n888 First Street, N.E. \n \nWashington, D.C. 20426 \nRe:  \nLS Power Grid California, LLC, Docket No. ER27-___-000 \nCalifornia Independent System Operator Corporation, Docket No. EL26-71-___ \nProposed Revisions to the LS Power Grid California, LLC Transmission Owner \nTariff to Provide for Large Load Interconnection and Cost Recovery \nDear Secretary Reese: \nPursuant to section 205 of the Federal Power Act (“FPA”)1 and Part 35 of the Federal Energy \nRegulatory Commission’s (“FERC” or “Commission”) regulations,2 and in response to the \nCommission’s order instituting the show cause proceeding in California Independent System \nOperator Corp.,3 LS Power Grid California, LLC (“LS Power Grid”) submits revisions to its \nTransmission Owner Tariff (“TO Tariff”) to establish a framework for the interconnection of Large \nLoads4 and for the recovery of the costs of transmission upgrades driven by Large Loads. The \nrevisions include (1) adding a new Section 10A and a new Appendix VI (Large Load \nInterconnection Procedures (“LLIP”)) to establish an interconnection process for Eligible \nCustomers for Large Load (“ECLLs”); (2) corresponding revisions to the TO Tariff; and (3) adding \na new Appendix V, the pro forma Large Load Cost Recovery Agreement (“CRA”). LS Power Grid \nrespectfully requests that the Commission accept the proposed tariff revisions to become \neffective January 16, 2027, sixty-one (61) days after filing, consistent with the Commission’s prior \nnotice requirement,5 and grant any necessary waivers. \n \n1  16 U.S.C. § 824d (2022). \n2  18 C.F.R. pt. 35 (2026). \n3  Cal. Indep. Sys. Operator Corp., 195 FERC ¶ 61,214 (2026) (“Show Cause Order”). \n4  Capitalized terms used but not otherwise deﬁned in this transmittal letter have the meanings assigned to them in \nthe TO Tariﬀ, including the proposed revisions to Section 3 and the pro forma CRA in Appendix V, or, if not deﬁned \ntherein, in the CAISO Tariﬀ. \n5  18 C.F.R. § 35.3(a)(1)."},{"page":2,"startToken":426,"endToken":938,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 2 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nI. \nINTRODUCTION AND SUMMARY OF FILING \nThe proposed revisions establish a transparent framework for LS Power Grid, a transmission-only, \nnon-load-serving Participating Transmission Owner (“PTO”) in the California Independent System \nOperator Corporation (“CAISO”), to interconnect Large Loads and to recover the costs of \ntransmission upgrades that are driven, in whole or in part, by a Large Load (“Large Load-Driven \nUpgrades”). New Section 10A and the LLIP in Appendix VI govern ECLL applications, studies, \ninterim service, and interconnection agreements. The pro forma CRA in Appendix V establishes \nthe Eligible Customer’s twenty-year Minimum Transmission Revenue Contribution (“MTRC”) and \nrelated payment and security obligations for each Covered Upgrade. Amounts received under a \nCRA are credited to transmission customers through LS Power Grid’s existing Transmission \nRevenue Balancing Account Adjustment (“TRBAA”), and LS Power Grid’s existing Formula Rate \nTemplate already identifies plant by project and removes TRBAA credits from Formula Rate \nrevenue credits. Therefore, those credits are not counted twice and no Formula Rate Template \nchanges are required. \nThe filing responds to the Show Cause Order’s direction that respondents (1) ensure transparency \nconcerning the network upgrade costs to provide transmission service to Eligible Customers on \nbehalf of large loads, (2) establish a pro forma cost recovery agreement to mitigate the risk of \ncost shifting among transmission customers, and (3) ensure that such payments are appropriately \ncredited toward transmission owners’ transmission revenue requirements.6 The CRA assigns the \nwholesale revenue-support obligation to the Eligible Customer that takes transmission service \non behalf of the Large Load Facility and backs that obligation with Construction Security, \nOperational Security, and a Termination Fee. The framework is designed to mitigate the risk that \nother customers bear the costs of a Covered Upgrade if the associated Large Load is delayed, \nreduced, or does not materialize, while preserving LS Power Grid’s recovery of its revenue \nrequirement through its Formula Rate and the CAISO Transmission Access Charge (“TAC”), and \nwithout changing CAISO cost allocation. \nThe proposed revisions do not change the cost-of-service inputs, return, depreciation, taxes, or \nallocators used to calculate LS Power Grid’s revenue requirement, and no changes are proposed \nto LS Power Grid’s Formula Rate Template (Appendix III), its Formula Rate Implementation \nProtocols (Appendix IV), or Appendix I of the TO Tariff. Once these revisions are accepted, a \nconforming, executed CRA with populated Schedules generally will not require an individual FPA \nsection 205 filing, while unexecuted agreements, agreements containing a material deviation, \nand other agreements required by Commission rule or order will be filed with the Commission.7 \n \n6  Show Cause Order at P 3. \n7  See Ex. No. LSC-200 (Arzola Testimony); CRA § 5.1."},{"page":3,"startToken":938,"endToken":1472,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 3 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nII. \nBACKGROUND \nA. LS Power Grid and Its Formula Rate \nLS Power Grid is a transmission-only PTO in the CAISO that owns the Gates and Round Mountain \nprojects, which CAISO selected LS Power Grid to develop through its competitive solicitation \nprocess, and is developing additional competitively selected projects. The Gates project is an \napproximately 850 MVAR STATCOM at the Gates Substation in Fresno County, and the Round \nMountain project is an approximately 530 MVAR STATCOM and associated 500 kV switchyard in \nShasta County. LS Power Grid is a non-load-serving PTO with no End-Use Customers; it neither \nserves retail load nor has a retail relationship with any customer seeking a Large Load \ninterconnection. LS Power Grid’s formula rate consists of its Formula Rate Template (Appendix \nIII of the TO Tariff) and its Formula Rate Implementation Protocols (“Protocols”) (Appendix IV of \nthe TO Tariff) (together, the “Formula Rate”), which were originally accepted in Docket No. ER21-\n195-000 and most recently revised in Docket No. ER26-2665-000. LS Power Grid’s Transmission \nRevenue Requirement (“TRR”) is the sum of its Base Transmission Revenue Requirement (“Base \nTRR”), determined under the Formula Rate, and its TRBAA, and is recovered through the CAISO \nTAC. LS Power Grid already uses the TRBAA to credit customers with revenue it receives outside \nthe TAC. \nB. Show Cause Order and Stakeholder Process \nOn June 18, 2026, the Commission issued the Show Cause Order, instituting an FPA section 206 \nproceeding in Docket No. EL26-71-000 directed to CAISO and its PTOs. The Commission \npreliminarily found that existing tariffs appear to be unjust, unreasonable, or unduly \ndiscriminatory or preferential because they lack sufficiently clear and consistent provisions to \naddress the challenges posed by the rapid growth of large loads and co-location arrangements \nbetween loads and generating facilities.8 The Commission directed each respondent either to \nshow cause why its tariff remains just and reasonable or to explain what tariff changes would \nremedy the identified concerns.9 \nFollowing the Show Cause Order, CAISO convened joint coordination meetings with the PTOs to \naddress the Show Cause Order and CAISO’s proposed implementation framework, and LS Power \nGrid participated in those meetings from July through October 2026. LS Power Grid also \nparticipated in CAISO’s public stakeholder meetings and submitted written comments on CAISO’s \nStraw Proposal, Draft Final Proposal, and Draft Tariff Language asking CAISO to recognize non-\nload-serving and affected PTOs expressly and to preserve a meaningful role for those PTOs in the \ninterconnection and study process. LS Power Grid further participated in discussions with other \nnon-load-serving PTOs, the broader PTO group, and load-serving PTOs addressing the application \nand study process, information sharing, technical coordination, and the allocation and recovery \n \n8  Show Cause Order at P 38. \n9  Id. at Ordering Para. B."},{"page":4,"startToken":1472,"endToken":1997,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 4 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nof costs.10 Those discussions highlighted the need to ensure that an affected PTO has a \nmeaningful role in the process even when it does not provide retail service to the requesting \nload. LS Power Grid’s proposal does not displace the separate arrangements that an Eligible \nCustomer must enter into with an Affected System Owner for an Affected System Upgrade or \nwith the owner of a regional project share owned by another entity.11 \nIII. \nDESCRIPTION OF THE PROPOSED REVISIONS \nA. Large Load Interconnection Framework (Section 10A and Appendix VI) \nA new Section 10A of the TO Tariff establishes an interconnection process for ECLL \nInterconnections. An ECLL is a Utility Distribution Company or Metered Subsystem that provides \nretail transmission and interconnection service to Large Load End-Users in the CAISO Balancing \nAuthority Area, and a Large Load is an End-User located at a single site behind one or more Points \nof Withdrawal from the CAISO Controlled Grid with a peak load of 50 MW or greater. Section \n10A.2 specifies the contents of an ECLL Interconnection Application, including the load ramp \nschedule, site plan, Site Control, permits and approvals, electrical configuration, related requests, \ntechnical data, and Co-Located Large Load information. Section 10A.3 directs that ECLL \nInterconnection Applications be processed, and ECLL Interconnection Agreements be tendered, \nexecuted, and filed, under the LLIP in Appendix VI. Section 10A.4 provides for Interim Firm \nInterconnection Service and Flexible Interim Load Interconnection (“FILI”) Service before the \nrequired facilities are completed. FILI Service is subject to curtailment, including during normal \noperating conditions, and is curtailed before Firm Interconnection Service. Section 10A.5 \naddresses Co-Located Large Loads, and Section 10A.6 requires a CRA for Large Load-Driven \nUpgrades.12 \nLS Power Grid’s proposed LLIP establishes a Commission-jurisdictional framework under which an \nEligible Customer for Large Load may request Flexible Interim Load Interconnection Service (“FILI \nService”), subject to study, deﬁned operating limitations, and curtailment by LS Power Grid or \nCAISO as necessary to maintain reliability. The implementing FILI Service Agreement will be \nentered into with LS Power Grid and, as applicable, CAISO, and will establish the applicable \noperating requirements, curtailment conditions, and curtailment implementation mechanism. LS \nPower Grid will work with CAISO and stakeholders to develop a standardized pro forma FILI \nService Agreement for a subsequent ﬁling. Pending that ﬁling, each FILI Service Agreement will \nbe consistent with the LLIP, the applicable Large Load Interconnection Agreement, and CAISO \nTariﬀ section 25.7.2, and will be ﬁled with the Commission as required under the LLIP and \napplicable law. \n \n10  See Ex. No. LSC-100 (Hayes Testimony). \n11  See CRA §§ 4.2 and 6.3.6. \n12  TO Tariﬀ §§ 3.28 and 3.56."},{"page":5,"startToken":1997,"endToken":2582,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 5 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nThe LLIP applies to new Large Loads, capacity increases to Large Loads previously processed \nunder the LLIP, and increases of 50 MW or greater to existing loads not previously processed \nunder the LLIP, for completed Interconnection Requests submitted after Appendix VI becomes \neffective. It provides for a scoping meeting, a Large Load Study Process Agreement, and a Large \nLoad Interconnection Study subject to CAISO review and concurrence, with a ninety-Calendar-\nDay reasonable-efforts study period. The study must consider alternative transmission \ntechnologies, including dynamic line ratings, advanced power flow control devices, advanced \nconductors, and transmission switching, and, if traditional network upgrades are selected, the \nPTO must demonstrate why alternative transmission technologies are not feasible or would not \nresult in lower costs or a faster timeline.13 The LLIP also establishes financial readiness \nrequirements, including a $250,000 Interconnection Study Deposit, Commercial Readiness \nDeposits that bring the aggregate deposit to twenty percent (20%) of the estimated construction \ncost of the Large Load Network Upgrades attributable to the request, and withdrawal penalties, \nand coordinates those deposits with the CRA so that the same costs are not secured twice.14 \nThe existing Section 10 is retitled the Transmission System Wholesale Load (“TSWL”) \nInterconnection Process and continues to govern TSWL Interconnections. Section 10.1 directs \nECLL requests to Section 10A, and revised Section 10.9 provides that, where a TSWL \nInterconnection will serve one or more Large Loads, the Eligible Customer taking or requesting \ntransmission service on behalf of the Large Load must execute and maintain a CRA, or request \nthat it be filed unexecuted, as a condition to LS Power Grid’s design, procurement, construction, \nor operation of any associated Large Load-Driven Upgrades. Section 3 adds definitions for, among \nother terms, Co-Located Large Load, Cost Recovery Agreement, ECLL, ECLL Interconnection, Firm \nInterconnection Service, FILI Service, Interim Firm Interconnection Service, Large Load, Point of \nWithdrawal, Site Control, and TSWL Interconnection, and renumbers the existing definitions. \nB. Pro Forma CRA (Appendix V) \nThe pro forma CRA is a contract between LS Power Grid, as Transmission Owner, and the Eligible \nCustomer taking wholesale transmission service under the CAISO Tariff on behalf of a Large Load \nCustomer. Assigning the payment obligation to that Eligible Customer preserves the wholesale \nobligor structure and does not establish a FERC-jurisdictional retail rate or payment obligation for \nthe Large Load Customer. The Large Load Customer executes a Limited Acknowledgment for \ninformation, authorization, notice, and cooperation purposes, but is not a party to the wholesale \npayment obligations. CAISO is not a party to the CRA, and the CRA creates no obligation of CAISO. \nCovered Upgrades include Large Load-Driven Upgrades and any LS Power Grid-owned share of a \nCAISO-Assigned Regional Project identified in the applicable Schedules for which an Annual MTRC \nis established; Affected System Upgrades and regional project shares owned by another entity \nare addressed through separate arrangements. Where LS Power Grid requires a CRA, Section 10.9 \n \n13  LLIP § 4.6.1.1. \n14  See LLIP §§ 3.10, 3.10.1, 4.2.1, and 4.6.1.4."},{"page":6,"startToken":2582,"endToken":3178,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 6 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \n(for a TSWL Interconnection) and LLIP Section 5.3, incorporated through Section 10A.6 (for an \nECLL Interconnection), require the applicable Eligible Customer to execute it, or to request that \nit be filed unexecuted, within the applicable interconnection-agreement execution period.15 \nFor each Covered Upgrade, the CRA establishes an Annual MTRC calculated solely under the \nMTRC Calculation Template in Schedule 5, separately from the Formula Rate. The Estimated \nAnnual MTRC uses then-current estimated capital cost. Within one year after the Covered \nUpgrade enters service, when actual capital cost is known, LS Power Grid establishes the Final \nAnnual MTRC as the final incurred capital cost multiplied by the Project-Specific Levelized Fixed \nCharge Rate calculated under Schedule 5 using the applicable capital structure, cost of debt, \nreturn on equity, income-tax inputs, a fixed five percent (5%) annual levelized-depreciation \nschedule, and the fixed expense allocator. The MTRC Term begins on the applicable in-service \ndate and ends on the day immediately preceding its twentieth anniversary, with partial Rate \nYears prorated. The Final Annual MTRC is not recalculated through the Formula Rate and may \nchange only as permitted by Section 6.3.1, including to correct error or fraud, to implement an \neffective prospective reassignment or a final Commission order, or to reflect prospectively a \nCommission-approved change in LS Power Grid’s return on equity or subsequently enacted tax \nrates or tax law.16 \nThe twenty-year MTRC Term is a defined contractual revenue-support period, not the \ndepreciable life of a Covered Upgrade. Each Covered Upgrade placed under CAISO’s Operational \nControl remains in LS Power Grid’s rate base and Base TRR and is subject to ordinary Formula \nRate treatment. Where an upgrade is driven by more than one Large Load, Schedule 1 identifies \nan Initial Allocation Percentage for each Large Load Customer using the applicable final study and \nallocation methodology, accounting for loads studied individually, jointly, or in a cluster and for \nany portion of the facility that serves other transmission system needs or customers. The \naggregate Annual MTRC allocated to all Large Load Customers may not exceed one hundred \npercent (100%) of the Annual MTRC for that Covered Upgrade; any unallocated portion remains \nsubject to otherwise applicable CAISO cost-allocation and rate-recovery requirements. Each \nallocation percentage is applied only once in calculating the Annual MTRC.17 \nThe Eligible Customer pays a Supplemental MTRC equal to the greater of zero and the applicable \nAnnual MTRC less Qualifying Transmission Revenues (“QTR”). QTR consists of wholesale \ntransmission revenues attributable to service to the Large Load Facility that reduce transmission \nrevenues otherwise collected from CAISO customers or directly credit LS Power Grid’s Net \nRevenue Requirement. As applicable, QTR includes the portion of TAC revenues attributable to \nthe Large Load Facility and allocable to LS Power Grid under the reproducible methodology in \nSchedule 2, qualifying Wheeling Access Charges, and other wholesale transmission-access, \n \n15  See CRA Recitals, § 2.17, Article 5, and Limited Acknowledgment; TO Tariﬀ §§ 10.9 and 10A.6; LLIP § 5.3. \n16  See CRA §§ 2.5, 2.26, 2.38, and 6.3.1 and Schedule 5. \n17  See id. § 6.3.2 and Schedule 1."},{"page":7,"startToken":3178,"endToken":3725,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 7 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nwheeling, or transmission-service charges, including charges paid through a non-PTO serving \nentity, without duplicate recognition. The Annual MTRC therefore operates as a revenue floor, \nnot an additive charge or separate capacity-reservation commitment. LS Power Grid invoices the \nforecast Supplemental MTRC, including any prior-period true-up adjustment, in monthly \ninstallments following each Annual Projection, and serves a Reconciliation Statement with each \nAnnual Update using actual QTR. Under-billed or over-billed amounts are carried into billing \nfollowing the next Annual Projection, without interest between LS Power Grid and the Eligible \nCustomer.18 \nSection 6.7 of the CRA establishes for each Covered Upgrade a Total Required Revenue \nCommitment equal to the Final Annual MTRC multiplied by twenty, which is reduced by QTR, \nSupplemental MTRC Receipts, Applied Security Proceeds, and other permitted amounts, without \ndouble counting, and tracked in an upgrade-specific Cumulative Revenue Ledger. Cancellation, \ndownsizing, curtailment, or cessation after an applicable in-service date does not itself eliminate \nthe Eligible Customer’s obligations. Upon effective termination of the CRA or permanent \ncessation of service after that date, the Eligible Customer owes a lump-sum Termination Fee \nequal to the Remaining Cumulative Revenue Responsibility, less any Supplemental MTRC billed \nand unpaid as of the effective termination or cessation date, which remains separately payable \nand secured. The Termination Fee is an accelerated contractual termination charge, not a \npenalty. LS Power Grid holds each Termination Fee in a separately identified, interest-bearing \nTermination Fee Account and credits it to transmission customers through the TRBAA as Annual \nTermination Fee Credits equal to the Annual MTRC for each remaining Rate Year of the MTRC \nTerm. The uncredited balance is accounted for as a deferred liability and is not included in rate \nbase.19 \nArticle 7 of the CRA requires Construction Security for incurred and irrevocably committed costs \nand Pre-In-Service Termination Costs, including applicable cancellation, demobilization, and \nrestoration costs and properly accrued allowance for funds used during construction. \nOperational Security must be delivered no later than thirty Calendar Days before the earliest \nexpected in-service date and equals one hundred percent (100%) of the nominal Remaining \nCumulative Revenue Responsibility. Consistent with the Commission’s decision to reduce \nunnecessary redundancy by allowing an Eligible Customer to rely on credit support posted by a \nlarge load under a retail agreement, direct Operational Security is reduced dollar-for-dollar by \nQualifying Retail Security Support identified in a currently effective Retail Security Certification. \nThat reduction does not reduce the underlying wholesale obligation and does not apply to \nConstruction Security or Pre-In-Service Termination Costs. Security does not cap the Eligible \nCustomer’s liability. Construction Security provided under an interconnection or engineering and \nprocurement agreement for the same costs counts toward, and is not duplicated by, the CRA \n \n18  See id. §§ 6.2 and 6.4–6.6 and Schedule 2. \n19  See id. §§ 3.3.4, 3.5, and 6.7."},{"page":8,"startToken":3725,"endToken":4329,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 8 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nrequirement.20 A Commercial Readiness Deposit may be credited dollar-for-dollar toward \nrequired CRA Construction Security only if it is in a form permitted under Schedule 3 and LS Power \nGrid elects that treatment in writing; no amount may be applied or credited more than once.21 \nThis ﬁling adopts the conservative requirement that direct Operational Security equal one \nhundred percent (100%) of the nominal Remaining Cumulative Revenue Responsibility, subject \nonly to Qualifying Retail Security Support. LS Power Grid expects to work with CAISO and \ninterested stakeholders to evaluate whether, and under what objectively deﬁned circumstances, \na lower requirement or another credit-support structure could provide comparable protection \nagainst cost shifting. Any future change would be submitted to the Commission for review under \nFPA section 205. \nC. Crediting CRA Amounts Through the TRBAA (Sections 3 and 5.3) \nCRA amounts are credited to transmission customers through LS Power Grid’s existing TRBAA, not \nas Formula Rate revenue credits. Because the TO Tariﬀ deﬁnes Transmission Revenue Credits as \namounts received from, or charges imposed by, CAISO, LS Power Grid proposes to revise the \ndeﬁnitions of the Transmission Revenue Balancing Account (“TRBA”) (Section 3.97) and the \nTRBAA (Section 3.98) and Section 5.3 so that the TRBAA also ﬂows through to transmission \ncustomers all amounts that a CRA requires to be credited through it. The revisions clarify that \nSection 5.3 does not require the payment of interest between LS Power Grid and a party to a CRA, \nwhich is governed solely by the CRA, and the deﬁnition of Interest (Section 3.54) is revised to the \nsame eﬀect. The deﬁnition of Transmission Revenue Credits is unchanged.22 \nEach October, LS Power Grid will include a Forecast TRBAA Credit equal to the projected \nSupplemental MTRC for the following year, increased or reduced by any prior-period true-up \nadjustment, plus any Annual Termination Fee Credit scheduled for that year. The Forecast TRBAA \nCredit lowers the TRR eﬀective January 1 and, through the TAC, the transmission charges paid by \nall customers, while the Eligible Customer pays the Supplemental MTRC directly to LS Power Grid. \nSupplemental MTRC cash receipts, Applied Security Proceeds applied to Supplemental MTRC \nobligations, Annual Termination Fee Credits, and any duplicate-recovery credits are recorded in \nthe TRBA. A billed but unpaid Supplemental MTRC is not a TRBAA Credit. If LS Power Grid later \nreceives payment or applies Security proceeds to that obligation, the amount is recorded only in \nthe Rate Year in which it is received or applied. Any diﬀerence between the Forecast TRBAA Credit \nand the actual amounts recorded in the TRBA is reﬂected in the TRBA principal balance and \nﬂowed through in subsequent TRBAA. QTR is not credited again, and posting, drawing, or holding \nSecurity does not itself produce a credit. The Eligible Customer remains liable for unpaid Large \nLoad Charges, and the CRA’s Security and collection provisions mitigate, but do not eliminate, \n \n20  See CRA §§ 7.1–7.3 and Schedule 3; LLIP § 3.10.1. \n21  Show Cause Order, Comm’r See Concurrence at P 9. \n22  TO Tariﬀ §§ 3.54, 3.97, 3.98, and 5.3; see also Ex. No. LSC-200 (Arzola Testimony)."},{"page":9,"startToken":4329,"endToken":4921,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 9 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nnonpayment risk. Because the TRBA ensures that LS Power Grid collects no more and no less than \nits Base TRR, LS Power Grid retains none of the TRBAA Credits.23 \nLS Power Grid’s annual TRBAA ﬁling is made under FPA section 205 and is noticed by the \nCommission, open to intervention, comment, and protest, and subject to Commission review and \nacceptance. LS Power Grid will include in each ﬁling the calculations, workpapers, and testimony \nsupporting the TRBAA Credits, substantially in the form of Exhibit No. LSC-202, with customer-\nspeciﬁc information presented on an aggregated basis or submitted with a request for privileged \ntreatment under 18 C.F.R. § 388.112. No change to Appendix I is required because TRBAA Credits \nare included in the TRBAA amount stated in Appendix I each year.24 \nBalances in the TRBA attributable to CRA amounts accrue interest in the same manner as other \nTRBA balances, because a balance created by a late payment, a non-payment before Security is \napplied, or the timing of monthly installments reﬂects an actual over- or under-recovery by LS \nPower Grid. By contrast, when further Supplemental MTRC will be invoiced, a prior-period true-\nup adjustment is added both to the Supplemental MTRC invoiced for a later Rate Year and to the \nForecast TRBAA Credit for that same year, so the matched adjustment does not itself create an \nover- or under-recovery. Consistent with Section 6.6 of the CRA and Section 5.3 of the TO Tariﬀ, \nno interest accrues on a prior-period true-up adjustment between LS Power Grid and the Eligible \nCustomer.25 \nD. Formula Rate Template and Rate Treatment of Covered Upgrades \nNo changes to LS Power Grid’s Formula Rate Template or Protocols are required. LS Power Grid’s \nexisting Attachment 1a – Project Plant Detail Worksheet already reports plant separately by \nproject, and Attachment 1 – Project Revenue Requirement Worksheet calculates each project’s \nrevenue requirement using the applicable allocation factors, so each Covered Upgrade can be \nreported as a separate project on those worksheets. Attachment 9 – Revenue Credit Detail, Line \n18, “Less: Revenue Credits included in the TRBAA,” removes any TRBAA Credits otherwise \nrecorded in the revenue accounts included on Attachment 9, so those amounts are credited to \ncustomers once, through the TRBAA, and not also through the Formula Rate. The full eligible cost \nof each Covered Upgrade therefore remains in the Base TRR. The existing Protocols govern the \nsupporting documentation, information exchange, review, challenge, and true-up of Formula \nRate inputs, including Covered Upgrade plant and the amounts removed on Attachment 9, Line \n18.26 \nCovered Upgrades placed under CAISO’s Operational Control are included in LS Power Grid’s rate \nbase and Base TRR in the same manner as other LS Power Grid transmission plant and are subject \nto LS Power Grid’s Commission-accepted Formula Rate, including any generally applicable \nCommission-approved return incentive. Covered Upgrades are not subject to the commitments \n \n23  See CRA § 6.8. \n24  See id.; Ex. No. LSC-200 (Arzola Testimony). \n25  See CRA § 6.6; TO Tariﬀ § 5.3. \n26  See Ex. Nos. LSC-100 (Hayes Testimony), LSC-200 (Arzola Testimony), and LSC-201."},{"page":10,"startToken":4921,"endToken":5458,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 10 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nto limit return on equity to 9.8%, inclusive of incentive ROE adders, and the equity component of \ncapital structure to 45%, which were made in connection with the competitive solicitations for \nthe Gates and Round Mountain projects and are reﬂected in the Approved Project Sponsor \nAgreements for those projects, and are not subject to the capital cost caps or annual revenue \nrequirement caps applicable to LS Power Grid’s competitively selected projects. Covered Upgrade \ncosts will be separately identiﬁed on Attachment 1a and excluded from the cost containment \nworksheets provided under Sections 1.c and 3.d(vi) of the Protocols (Attachments 11 and 12 of \nthe Formula Rate Template). LS Power Grid is not requesting a diﬀerent return on equity, a \ndiﬀerent capital structure, or a new incentive ROE adder in this proceeding.27 \nE. Supporting Testimony and Illustrative Exhibits \nMr. Patrick Hayes’ testimony (Exhibit No. LSC-100) describes the Show Cause Order, the CAISO \nstakeholder process, the pro forma CRA, and the associated TO Tariff revisions, and explains how \nthose measures assign cost responsibility for Large Load-Driven Upgrades, mitigate cost shifting \nand stranded-asset risk, avoid double recovery, and promote transparency. His supporting \nexhibits provide an Illustrative MTRC Calculation (Exhibit No. LSC-101), an Example Reconciliation \nStatement (Exhibit No. LSC-102), and an Example Invoice Statement (Exhibit No. LSC-103). \nMr. D. Eric Arzola’s testimony (Exhibit No. LSC-200) explains the crediting of CRA amounts \nthrough the TRBAA and the related TO Tariff revisions, and explains why no changes are needed \nto the Formula Rate Template, the Protocols, or Appendix I. His supporting exhibits include an \nIllustrative Formula Rate Template populated with hypothetical data for the 2030 Rate Year \n(Exhibit No. LSC-201) and an Illustrative TRBAA Calculation for the TRBA years ending September \n30, 2030 and 2031 (Exhibit No. LSC-202). Using a hypothetical $60 million Covered Upgrade with \nan Annual MTRC of $10,278,360, projected QTR of $3,363,840, and a Supplemental MTRC of \n$6,914,520, those exhibits demonstrate that the TRBAA Credits are removed on Attachment 9, \nLine 18 and returned to customers through the TRBAA, so that they are credited only once. \nIV. \nTHE PROPOSED REVISIONS ARE JUST AND REASONABLE \nLS Power Grid’s approach materially mitigates the cost-shifting concern identified in the Show \nCause Order. Before in-service, LLIP deposits, Construction Security, and the Pre-In-Service \nTermination Cost provisions protect against cancellation and related exposure. After an upgrade \nenters service, the Annual MTRC, Supplemental MTRC, Total Required Revenue Commitment, \nRequired Operational Security, and Termination Fee establish and secure a defined twenty-year \nrevenue responsibility tied to the allocated capital cost of the identified Covered Upgrades. That \ndesign responds to the concern that bilateral revenue contributions “untethered from any \n \n27  See Ex. Nos. LSC-100 (Hayes Testimony) and LSC-200 (Arzola Testimony)."},{"page":11,"startToken":5458,"endToken":6026,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 11 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nassessment of the actual cost of providing transmission service induced by individual large loads” \nmay be insufficient to protect other customers against unjustified cost shifts.28 \nThe proposal also supplies the transparency and crediting mechanisms the Commission \nidentified. The CRA Schedules, Annual Projection workpapers, Reconciliation Statements, and \nCumulative Revenue Ledger make the upgrade-specific calculations available to the Eligible \nCustomer, which has information rights under CRA Section 6.12 and dispute rights under Article \n11. Attachment 1a separately identifies Covered Upgrade plant, and each annual TRBAA filing is \nan FPA section 205 proceeding in which interested parties may review and challenge the TRBAA \nCredits. The LLIP further provides for study reports, a Report Meeting addressing study results \nand assigned cost responsibility, and CAISO posting of FILI Service Agreements. Customer-specific \ninformation is protected under Section 15.3 of the TO Tariff, the CAISO Tariff, and, in TRBAA \nfilings, 18 C.F.R. § 388.112. \nCrediting CRA amounts through the TRBAA ensures that Large Load payments are credited \ntoward LS Power Grid’s TRR. The full cost of each Covered Upgrade remains in the Base TRR, \nconsistent with CAISO’s requirement that facilities under its Operational Control be included in \nthe TRR, while the TRBAA reduces the TRR paid by all customers through the TAC by the amounts \nreceived under the CRA. The TRBA ensures that LS Power Grid collects no more and no less than \nits Base TRR, and Attachment 9, Line 18 ensures that each dollar is credited only once. The CRA \ndoes not alter CAISO cost allocation or the retail arrangements between an Eligible Customer and \na Large Load Customer. \nFinally, the proposal is appropriately tailored to LS Power Grid as a non-load-serving PTO. It gives \nLS Power Grid a meaningful interconnection and cost-recovery role when a Large Load affects its \nfacilities, even though LS Power Grid has no retail relationship with the load, and requires \nevaluation of alternative transmission technologies before traditional network upgrades are \nselected, consistent with the Commission’s focus on keeping costs at a responsible and \naccountable level. It does not disturb the Gates and Round Mountain projects, LS Power Grid’s \nexisting revenue requirement, CAISO cost allocation, or CAISO’s study and planning authority. \nV. \nREQUESTED EFFECTIVE DATE AND WAIVERS \nLS Power Grid requests an effective date of January 16, 2027, sixty-one (61) days after the date \nof this filing, satisfying the Commission’s sixty-day notice requirement.29 LS Power Grid requests \nwaiver of the cost-of-service-statement requirements of 18 C.F.R. § 35.13, and any other Part 35 \nrequirements that otherwise may apply, to the extent necessary. The requested waivers are \nappropriate because the filing establishes a prospective interconnection and contractual \nframework, does not change the cost-of-service inputs or methods of LS Power Grid’s Formula \nRate, and requires no changes to LS Power Grid’s Formula Rate Template or Protocols. \n \n28  Show Cause Order, Comm’r Chang Concurrence at P 8. \n29  18 C.F.R. § 35.3(a)(1)."},{"page":12,"startToken":6026,"endToken":6389,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 12 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nVI. \nCONTENTS OF FILING \nLS Power Grid submits the following materials: \n• This transmittal letter; \n• Attachment 1: Clean version of the LS Power Grid TO Tariff revisions \n• Attachment 2: Marked version of the LS Power Grid TO Tariff revisions \n• Attachment 3: Direct testimony of Patrick Hayes (Exhibit No. LSC-100) and supporting \nexhibits: \no Illustrative MTRC Calculation (Exhibit No. LSC-101),  \no Example Reconciliation Statement (Exhibit No. LSC-102), and  \no Example Invoice Statement (Exhibit No. LSC-103).  \n• Attachment 4: Direct testimony of D. Eric Arzola (Exhibit No. LSC-200) and supporting \nexhibits:  \no Illustrative Formula Rate Template (Exhibit No. LSC-201), and  \no Illustrative TRBAA Calculation (Exhibit No. LSC-202). \nVII. \nCOMMUNICATIONS AND SERVICE \nLS Power Grid requests that all pleadings, correspondence, and other communications \nconcerning this matter be directed to the following persons, and that their names and addresses \nbe placed on the official service list for this proceeding:30 \nJosh R. Robichaud \nAssociate \nBracewell LLP \n2001 M Street NW, Suite 900 \nWashington, DC 20036 \n(202) 828-1731 \njosh.robichaud@bracewell.com \nBlake R. Urban \nSenior Regulatory Counsel \nLS Power Development, LLC \n16150 Main Circle Drive, Suite 310 \nChesterfield, MO 63017 \n(636) 231-0475 \nburban@lspower.com \n \nCatherine P. McCarthy \nPartner \nBracewell LLP \n2001 M Street NW, Suite 900 \nWashington, DC 20036 \n(202) 828-5839 \ncathy.mccarthy@bracewell.com \nPatrick Hayes \nAssociate Vice President, Transmission Regulatory \nLS Power Development, LLC \n16150 Main Circle Drive, Suite 310 \nChesterfield, MO 63017 \n(636) 532-2200 \nphayes@lspower.com \n \n30 LS Power Grid respectfully requests waiver of Rule 203(b)(3) of the Commission’s Rules of Practice and Procedure, \n18 C.F.R. § 385.203(b)(3), to the extent necessary to permit designation of more than two persons for service on its \nbehalf in this proceeding."},{"page":13,"startToken":6389,"endToken":6555,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 13 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nLS Power Grid has served a copy of this filing on CAISO, on the service list in Docket No. EL26-71-\n000, and on parties otherwise entitled to service under the Commission’s regulations. \nVIII. \nCONCLUSION \nFor the reasons stated above and in the supporting testimony, LS Power Grid respectfully \nrequests that the Commission accept the proposed tariff revisions effective January 16, 2027, \nand grant any waivers deemed necessary. \nRespectfully submitted, \n/s/ Josh R. Robichaud __ ___  \nJosh R. Robichaud \nCatherine P. McCarthy \n      \nCounsel to LS Power Grid California, LLC"},{"page":14,"startToken":6555,"endToken":6564,"text":"Attachment 1 \n \nLS Power Grid TO Tariff Revisions (Clean)"},{"page":15,"startToken":6564,"endToken":6737,"text":"1 \nLS Power Grid TO Tariff \nLS Power Grid California, LLC \nTransmission Owner Tariff \nTable of Contents \n1.\nPreamble\n1.1 \nTransmission Access for Wheeling Customers\n1.2 \nTransmission Access for End-Users\n2.\nEffective Date\n2.1 \nTermination\n3.\nTO Definitions\n4.\nEligibility for Service\n5.\nAccess Charges and Transmission Rates\n5.1 \nWheeling Access Charge\n5.2 \nTransmission Revenue Requirement\n5.3 \nTransmission Revenue Balancing Account Adjustment\n6.\nAncillary Services - Applicability and Charges\n7.\nBilling and Payment\n8.\nObligation to Interconnect or Construct Transmission Expansions and Facility\nUpgrades\n8.1 \nParticipating TO Obligation to Interconnect \n8.2 \nParticipating TO Obligation to Construct Transmission Expansions or \nFacility Upgrades \n8.3 \nRequest for FERC Deference Regarding Need Determination \n9.\nParticipating TO Process for Construction or Expansion of Transmission\nFacilities\n9.1 \nApplicability and  Determination of Facilities \n9.2 \nObligation to Build \n9.3 \nProvisions Relating To Transmission Construction On the Systems of \nOther TOs \n10.\nTSWL  \nInterconnection Process\n10.1 \nApplicability \n10.2 \nTSWL Interconnection Applications \n10.3 \nReview of Completed TSWL Interconnection Application"},{"page":16,"startToken":6737,"endToken":6906,"text":"2 \nLS Power Grid TO Tariff \n \n \n10.4 \nNotice of Need for System Impact Study \n10.5 \nSystem Impact Study Cost Reimbursement and Agreement \n10.6 \nSystem Impact Study Procedures \n10.7 \nNotice of Need for Facilities Study \n10.8 \nFacilities Study Procedures \n10.9 \nInterconnection Agreement \n10.10 \nPartial Interim Service \n10.11 \nExpedited Interconnection Procedures \n10A. Interconnection Process for ECLL Interconnections \n10A.1 \nApplicability \n10A.2 \nECLL Application and Application Fee \n10A.3 \nStudy Process and ECLL Interconnection Agreement \n10A.4 \nInterim Service \n10A.5 \nCo-Located Large Load \n11. \nUncontrollable Forces and Indemnification \n11.1 \nProcedures to Follow If Uncontrollable Force Occurs \n11.2 \nIndemnification \n12. \nRegulatory Filings \n12.1 \nOpen Access \n13. \nCreditworthiness \n13.1 \nUDCs, MSSs, and Scheduling Coordinators Using the Participating \nTO’s Low Voltage Transmission Facilities \n13.2 \nEnd-Users \n14. \nDisputes \n15. \nMiscellaneous \n15.1 \nNotices \n15.2 \nWaiver \n15.3 \nConfidentiality \n15.4 \nTO Tariff Supersedes Existing Tariffs \n15.5 \nTitles \n15.6 \nSeverability \n15.7 \nPreservation of Obligations \n15.8 \nGoverning Law"},{"page":17,"startToken":6906,"endToken":6962,"text":"3 \nLS Power Grid TO Tariff \n \n \n15.9 \nAppendices Incorporated \n15.10 Conflict with CAISO Tariff \n15.11 Conflicting Operating Instructions \n \nAppendix I \n \nTransmission Revenue Requirement and TRBAA  \nAppendix II \n \nNotices \nAppendix III    \nFormula Rate \nAppendix IV    \nFormula Rate Implementation Protocols \nAppendix V \n \nPro Forma Large Load Cost Recovery Agreement \nAppendix VI  \nLarge Load Interconnection Procedures"},{"page":18,"startToken":6962,"endToken":7399,"text":"4 \nLS Power Grid TO Tariff \n \n \n1. \nPreamble. The Participating TO’s revenue requirements and applicable rates and \ncharges for transmission access over the CAISO Controlled Grid and the terms and \nconditions for transmission expansion and interconnection are set forth in this TO \nTariff and the CAISO Tariff.  For purposes of this TO Tariff and the CAISO Tariff, \nLS Power Grid California, LLC (“LS Power Grid”) is a Non-Load-Serving \nParticipating TO and has no End-Use Customers.  \n \n1.1 \nTransmission Access for Wheeling Customers.  Wheeling allows Scheduling \nCoordinators to deliver Energy through or out of the CAISO Controlled Grid to \nserve a load located outside the transmission or Distribution System of a \nParticipating TO. Wheeling Access Charges shall be paid by Scheduling \nCoordinators to the CAISO pursuant to the CAISO Tariff. \n \n1.2 \nTransmission Access for End-Users.  End-Users receive transmission service \nover the CAISO Controlled Grid through the Scheduling Coordinator designated \nby the End-User.  Charges to UDCs or MSSs of each Participating TO on behalf \nof the End-Users for access to the CAISO Controlled Grid shall be paid to the \napplicable Participating TO consistent with the distribution of the Regional \nAccess Charge in Section 26.1.3 of the CAISO Tariff.   \n \n \n2.    \nEffective Date.  This TO Tariff is effective on the date accepted by the FERC and shall \ncontinue to be effective, as amended from time to time, so long as LSPGC is a party to \nthe Transmission Control Agreement. \n \n2.1 \nTermination. This TO Tariff may be terminated by LSPGC upon such \nadvance notice and with such authorization as FERC may require. \n \n \n3.    \nTO Definitions. Certain capitalized terms used in this TO Tariff shall have the meanings \nset out below unless otherwise stated or the context otherwise requires. Capitalized terms \nused in this TO Tariff and not defined below shall have the meanings set out in the \nCAISO Tariff as it may be amended from time to time. \n \n3.1 \nAccess Charge.   A charge paid by all UDCs, MSSs, and, in certain cases, \nScheduling Coordinators delivering Energy to Gross Load, as set forth in Section \n26.1 of the CAISO Tariff.   \n \n3.2 \nAGC. Generation equipment that automatically responds to signals from the \nCAISO’s EMS control in real time to control the power output of electric \ngenerators within a prescribed area in response to a change in system frequency, \ntie-line loading, or the relation of these to each other, so as to maintain the target \nsystem frequency and/or the established interchange with other areas within the \npredetermined limits. \n \n3.3 \nAncillary Services.  Regulation, Spinning Reserve, Non-Spinning Reserve, \nVoltage Support and Black Start together with such other interconnected"},{"page":19,"startToken":7399,"endToken":7761,"text":"5 \nLS Power Grid TO Tariff \n \n \noperation services as the CAISO may develop in cooperation with Market \nParticipants to support the transmission of Energy from generation resources to \nLoads while maintaining reliable operation of the CAISO Controlled Grid in \naccordance with Good Utility Practice. \n \n3.4 \nApplicable Reliability Criteria. The Reliability Standards and reliability criteria \nestablished by NERC and WECC, and Local Reliability Criteria, as amended \nfrom time to time, including any requirement of the Nuclear Regulatory \nCommission. \n \n3.5 \nAvailable Transfer Capacity. The available capacity of a given transmission \npath, in MW after allocation of rights associated with Existing Contracts and \nTransmission Ownership Rights, to that path’s Operating Transfer Capability \nestablished consistent with CAISO and WECC transmission capacity rating \nguidelines, as further described in Appendix L to the CAISO Tariff. \n \n3.6 \nBase Transmission Revenue Requirement. The Transmission Revenue \nRequirement which does not reflect amounts for the TRBAA. \n \n3.7 \nBlack Start. The procedure by which a Generating Unit self-starts without an \nexternal source of electricity, thereby restoring power to the CAISO Controlled \nGrid following system or local area blackouts. \n \n3.8 \nBusiness Day.  Monday through Friday, excluding federal holidays and the day \nafter Thanksgiving Day. \n3.9 \nCalifornia Independent System Operator (“CAISO”). The California \nIndependent System Operator Corporation, a state chartered, California \nnonprofit public benefit corporation that operates the transmission facilities of \nall Participating TOs and dispatches certain Generating Units and Loads. \n3.10 \nCAISO ADR Procedures. The procedures for resolution of disputes or \ndifferences set out in Section 13 of the CAISO Tariff, as amended from time to \ntime. \n \n3.11 \nCAISO Controlled Grid. The system of transmission lines and associated \nfacilities of the Participating TOs that have been placed under the CAISO’s \nOperational Control. \n \n3.12 \nCAISO Protocols.  The rules, protocols, procedures and standards \npromulgated by the CAISO (as amended from time to time) to be complied \nwith by the CAISO Scheduling Coordinators, Participating TOs and all other \nMarket Participants in relation to the operation of the CAISO Controlled Grid \nand the participation in the markets for Energy and Ancillary Services in \naccordance with the CAISO Tariff. \n \n3.13 \nCAISO Tariff.   The California Independent System Operator Agreement and"},{"page":20,"startToken":7761,"endToken":8146,"text":"6 \nLS Power Grid TO Tariff \n \n \nTariff, dated March 31, 1997, as it may be modified from time to time. \n \n3.14 \nCo-Located Large Load. A Large Load that is physically connected to the \nfacilities of an existing or planned Generating Facility on the Interconnection \nCustomer’s side of the Point of Interconnection to the CAISO Controlled Grid \n(each as defined in the CAISO Tariff). \n \n3.15 \nCompleted Application Date. The date on which a party submits a \nTSWL Interconnection Application or ECLL Interconnection \nApplication that satisfies the requirements of a Completed TSWL \nInterconnection Application or Completed ECLL Interconnection \nApplication, as applicable. \n \n3.16 \nCompleted ECLL Interconnection Application. An ECLL Interconnection \nApplication that has been deemed valid under Section 4.3 of Appendix VI. \n \n3.17 \nCompleted TSWL Interconnection Application. A TSWL Interconnection \nApplication that satisfies all of the information and other requirements of this TO \nTariff and, if applicable, the information requirements as specified by the CAISO \nand posted on the CAISO Home Page. \n \n3.18 \nCongestion. A characteristic of the transmission system produced by a binding \nConstraint to the optimum economic dispatch to meet Demand such that the \nLMP, exclusive of Marginal Cost of Losses, at different Locations of the \ntransmission system is not equal. \n \n3.19 \nCongestion Management. The alleviation of Congestion in accordance \nwith applicable CAISO Protocols and Good Utility Practice. \n \n3.20 \nConverted Rights. Those transmission service rights determined in \naccordance with Section 4.3.1.6 of the CAISO Tariff. \n \n3.21 \nCost Recovery Agreement. An agreement between the Participating TO and an \nEligible Customer, including an ECLL, substantially in the form of the pro forma \nLarge Load Cost Recovery Agreement set forth in Appendix V, entered into \npursuant to Section 10.9 or Section 10A.6 of this TO Tariff. \n \n3.22 \nCPUC. The California Public Utilities Commission or its successor. \n \n3.23 \nDemand. The rates at which Energy is delivered to Load and Scheduling Points \nby Generation, transmission or distribution facilities. It is the product of voltage \nand the in-phase component of alternating current measured in units of watts or \nstandard multiples therefore, e.g. 1000 W = 1 kW, 1000 kW= 1 MW, etc. \n \n3.24 \nDirect Assignment Facilities. Facilities or portions of facilities that are owned \nby the Participating TO necessary to physically and electrically interconnect a"},{"page":21,"startToken":8146,"endToken":8557,"text":"7 \nLS Power Grid TO Tariff \n \n \nparticular party requesting a TSWL Interconnection under this TO Tariff to the \nCAISO Controlled Grid at the point of interconnection. Direct Assignment \nFacilities shall be specified in the Interconnection Agreement that governs TSWL \nInterconnection service to such party and shall be subject to FERC approval.  \n \n3.25 \nDispatch. The operating control of an integrated electric system to: i) assign \nspecific Generation Units and other sources of supply to effect the supply to \nmeet the relevant area Demand taken as Load rises or falls; ii) control operations \nand maintenance of high voltage lines, substations, and equipment, including \nadministration of safety procedures; iii) operate Interconnections; iv) manage \nEnergy transactions with other interconnected Control Areas; and v) curtail \nDemand. \n \n3.26 \nDistribution System. The distribution assets of a TO, UDC, or MSS. \n \n3.27 \nEligible Customer. (i) Any utility (including any Participating TO, Market \nParticipant or power marketer), Federal power marketing agency, or any person \ngenerating Energy for sale or resale; Energy sold or produced by such entity may \nbe Energy produced in the United States, Canada or Mexico; however, such entity \nis not eligible for transmission service that would be prohibited by FPA Section \n212(h)(2); and (ii) any retail customer taking unbundled transmission service \npursuant to a state retail access program or pursuant to a voluntary offer of \nunbundled retail transmissions service by the Participating TO. \n \n3.28 \nEligible Customer for Large Load (“ECLL”). A UDC or MSS that provides \nretail transmission and interconnection service to Large Load End-Users in the \nCAISO’s Balancing Authority Area. \n \n3.29 \nECLL Interconnection. The interconnection of the facilities of an ECLL to the \nfacilities of the Participating TO that are for the purpose of an ECLL \ninterconnecting and providing transmission service to a Large Load Customer. \n \n3.30 \nECLL Interconnection Agreement. The agreement between an ECLL and the \nParticipating TO governing an ECLL Interconnection. \n \n3.31 \nECLL Interconnection Application. An application that requests an ECLL \nInterconnection to the CAISO Controlled Grid. \n \n3.32 \nECLL Interconnection Facilities. The facilities, additions, and upgrades of the \nParticipating TO necessary to accomplish an ECLL Interconnection, as identified \nin the applicable ECLL Interconnection Agreement. \n \n3.33 \nEncumbrance. A legal restriction or covenant binding on the Participating TO \nthat affects the operation of any transmission lines or associated facilities and \nwhich the CAISO needs to take into account in exercising Operational Control \nover such transmission lines or associated facilities if the Participating TO is not"},{"page":22,"startToken":8557,"endToken":8958,"text":"8 \nLS Power Grid TO Tariff \n \n \nto risk incurring significant liability. Encumbrances shall include Existing \nContracts and may include: (1) other local restrictions or covenants meeting the \ndefinition of Encumbrance and arising under other arrangements entered into \nbefore the CAISO Operations Date, if any; and (2) legal restrictions or covenants \nmeeting the definition of Encumbrance and arising under a contract or other \narrangement entered into after the CAISO Operations Date. \n \n3.34 \nEnd-Use Customer or End-User. A purchaser of electric power that purchases \nsuch power to satisfy a Load directly connected to the CAISO Controlled Grid or \nto a Distribution System and who does not resell the power. \n \n3.35 \nEnergy. The electrical energy produced, flowing, or supplied by Generation, \ntransmission, or distribution facilities, being the integral with respect to time \nof the instantaneous power, measured in units of watt-hours or standard \nmultiples thereof. E.g. 1000 Wh = 1 kW, 1000 kWh = 1 MWh, etc. \n \n3.36 \nEntitlement. The right of a Participating TO obtained through contract or \nother means to use another entity’s transmission facilities for the transmission \nof Energy. \n \n3.37 \nExisting Contracts.  Those transmission service agreements or other contracts \nwhich grant transmission service rights in existence on the CAISO Operations \nDate (including any contracts entered into pursuant to such contracts) as may \nbe amended in accordance with their terms or by agreement between the parties \nthereto from time to time. \n \n3.38 \nExisting Rights. Those transmission service rights defined in Section 16.1 of the \nCAISO Tariff. \n \n3.39 \nExpedited Interconnection Agreement. A contract between a party which \nhas submitted a Request for Expedited Interconnection Procedures and the \nParticipating TO under which the Participating TO agrees to process, on an \nexpedited basis, the Completed TSWL Interconnection Application of such \nparty and which sets forth the terms, conditions, and cost responsibilities for \nsuch TSWL Interconnection. \n \n3.40 \nFacilities Study Agreement. An agreement between a Participating TO and \neither a party requesting Interconnection to the CAISO Controlled Grid, Market \nParticipants, Project Sponsor, ECLL, or identified principal beneficiaries \npursuant to which the party requesting such Interconnection agrees to reimburse \nthe Participating TO for the cost of performing or reviewing a Facilities Study. \n \n3.41 \nFacility or Facilities Study. An engineering study conducted to determine \nrequired modifications to the Participating TO’s transmission system, including \nthe estimated cost and scheduled completion date for such modifications, that \nwill be required to provide needed services."},{"page":23,"startToken":8958,"endToken":9342,"text":"9 \nLS Power Grid TO Tariff \n \n \n \n3.42 \nFERC. The Federal Energy Regulatory Commission, or its successor. \n \n3.43 \nFirm Interconnection Service. The highest quality (priority) load \nInterconnection service that provides the on-going safe and reliable operation and \nmaintenance of, and the Parties’ rights and responsibilities associated with their \nfacilities. \n \n3.44 \nFlexible Interim Load Interconnection (“FILI”) Service. A transmission \ninterconnection service offered by the Participating TO and accepted by an \nEligible Customer on behalf of a Large Load retail customer to manage \noperational constraints on withdrawals from the transmission system while the \ninterconnection and system upgrades necessary to provide Firm Interconnection \nService are being developed. \n \n3.45 \nFILI Service Agreement. The agreement developed by the Participating TO \npursuant to Section 10A.4 that sets forth the terms, conditions, and operating \nrequirements for FILI Service. \n \n3.46 \nFPA. The Federal Power Act, 16 U.S.C.§ 791a et seq., as it may be \namended from time to time. \n \n3.47 \nGenerating Facility. An Interconnection Customer’s Generating Unit(s) used for \nthe production and/or storage for later injection of electricity identified in the \nInterconnection Request, but shall not include the Interconnection Customer’s \nInterconnection Facilities. \n \n3.48 \nGenerating Unit. An individual electric generator and its associated plant and \napparatus whose electrical output is capable of being separately identified and \nmetered or a Physical Scheduling Plant, that, in either case, is: (a) located within \nthe CAISO Control Area; (b) connected to the CAISO Controlled Grid, either \ndirectly or via interconnected transmission or distribution facilities; and (c) that \nis capable of producing and delivering net Energy (Energy in excess of a \ngeneration stations’ internal power requirements). \n \n3.49 \nGeneration. Energy delivered from a Generating Unit. \n \n3.50 \nGenerator Interconnection. The interconnection of one or more Generating \nUnits to the CAISO Controlled Grid facilities owned by the Participating TO. \n \n3.51 \nGood Utility Practice. Any of the practices, methods, and acts engaged in or \napproved by a significant portion of the electric utility industry during the \nrelevant time period, or any of the practices, methods, and acts which, in the \nexercise of reasonable judgment in light of the facts known at the time the \ndecision was made, could have been expected to accomplish the desired result at \na reasonable cost consistent with good business practices, reliability, safety, and"},{"page":24,"startToken":9342,"endToken":9811,"text":"10 \nLS Power Grid TO Tariff \n \n \nexpedition. \n \n3.52 \nGross Load. For purposes of calculating the transmission Access Charge, Gross \nLoad is all Energy (adjusted for distribution losses) delivered for the supply of \nEnd-Use Customer Loads directly connected to the transmission facilities or \ndirectly connected to the Distribution System of a Utility Distribution Company \nor MSS Operator located in a PTO Service Territory. Gross Load shall exclude \n(1) Load with respect to which the Wheeling Access Charge is payable, (2) Load \nthat is exempt from the Access Charge pursuant to Section 4.1, Appendix I of \nthe CAISO Tariff, and the portion of the load of an individual retail customer of \na Utility Distribution Company, Small Utility Distribution Company or MSS \nOperator that is served by a Generating Unit that: (a) is located on the \ncustomer’s site or provides service to the customer’s site through over-the-fence \narrangements as authorized by Section 218 of the California Public Utilities \nCode; (b) is a qualifying small power production facility or qualifying \ncogeneration facility, as those terms are defined in the FERC’s regulations \nimplementing Section 201 of the Public Utility Regulatory Policies Act of 1978; \nand (c) secures Standby Service from the Participating TO under terms approved \nby a Local Regulatory Authority or FERC, as applicable, or can be curtailed \nconcurrently with an Outage of the Generating Unit serving the Load.  Gross \nLoad forecasts consistent with filed Transmission Revenue Requirements will \nbe provided by each Participating TO to the CAISO. \n \n3.53 \nInterconnection Agreement. A contract between a party requesting a TSWL \nInterconnection and a Participating TO, as it may be amended from time to \ntime, and, for an ECLL Interconnection, the ECLL Interconnection Agreement. \n \n3.54 \nInterest. Interest shall be calculated in accordance with the methodology \nspecified for interest on refunds in the regulations of FERC at 18 C.F.R. § \n35.19a(a)(2)(iii). Interest on delinquent amounts shall be calculated from the due \ndate of the bill to the date of payment. When payments are made by mail, bills \nshall be considered as having been paid on the date of receipt. Notwithstanding \nthe foregoing, interest, if any, on amounts payable or refundable between the \nParticipating TO and a party to a Cost Recovery Agreement shall be governed \nsolely by that Cost Recovery Agreement. \n \n3.55 \nInterim Firm Interconnection Service. Interconnection service that can be \nprovided, if any, on a firm basis prior to the completion of the ECLL \nInterconnection Facilities and an authorization for the Large Load to withdraw \nEnergy. \n \n3.56 \nLarge Load. An End-User located at a single site behind one or more Point(s) of \nWithdrawal from the CAISO Controlled Grid and that has a peak load of 50 MW \nor greater. \n \n3.57 \nLoad. An end-use device of an End-Use Customer that consumes power.  Load"},{"page":25,"startToken":9811,"endToken":10199,"text":"11 \nLS Power Grid TO Tariff \n \n \nshould not be confused with Demand, which is the measure of power that a Load \nreceives or requires. \n3.58 \nLocal Publicly Owned Electric Utility. A municipality or municipal corporation \noperating as a public utility furnishing electric service, a municipal district \nfurnishing electric services, or a joint powers authority that includes one or more \nof these agencies and that owns Generation or transmission facilities, or furnishes \nelectric services over its own or its members’ electric Distribution System. \n \n3.59 \nLocal Regulatory Authority. The state or local governmental authority \nresponsible for the regulation or oversight of a utility. \n \n3.60 \nLocal Reliability Criteria. Reliability criteria established by the CAISO, unique \nto the transmission systems of each of the Participating TOs, as they may be \nupdated from time to time. \n \n3.61 \nLS Power Grid California, LLC (“LS Power Grid”).  The Delaware limited \nliability company that is the Participating TO under this TO Tariff. \n \n3.62 \nMarket Participant. An entity, including a Scheduling Coordinator, who \nparticipates in the Energy marketplace through the buying, selling, \ntransmission, or distribution of Energy or Ancillary Services into, out of, or \nthrough the CAISO Controlled Grid. \n \n3.63 \nMetered Subsystem (“MSS”).  A geographically contiguous system, located \nwithin a single zone which has been operating as an electric utility for a \nnumber of years prior to the CAISO Operations Date as a municipal utility, \nwater district, irrigation district, state agency or federal power marketing \nauthority subsumed within the CAISO Balancing Authority Area and \nencompassed by CAISO certified revenue quality meters at each interface \npoint with the CAISO Controlled Grid and CAISO-certified revenue quality \nmeters on all Generating Units or, if aggregated, each individual resource and \nParticipating Load, Reliability Demand Response Resource, and Proxy \nDemand Resource internal to the system, which is operated in accordance with \na MSS agreement described in Section 4.9.1 of the CAISO Tariff. \n \n3.64 \nNERC.  The North American Electric Reliability Corporation or its successor. \n \n3.65 \nNew Participating TO. A Participating TO that is not an Original Participating \nTO. \n \n3.66 \nNon-Load-Serving Participating TO. A Participating TO that does not serve \nLoad. \n \n3.67 \nNon-Participating TO. A TO that is not a party to the TCA or, for the purpose \nof Section 16.1 of the CAISO Tariff, the holder of transmission service rights"},{"page":26,"startToken":10199,"endToken":10656,"text":"12 \nLS Power Grid TO Tariff \n \n \nunder an Existing Contract that is not a Participating TO. \n \n3.68 \nNon-Spinning Reserve. The portion of off-line generating capacity that is \ncapable of being synchronized and ramping to a specified load in ten minutes \n(or load that is capable of being interrupted in ten minutes) and that is capable \nof running (or being interrupted) for at least two hours. \n \n3.69 \nOperational Control. The rights of the CAISO under the Transmission Control \nAgreement and the CAISO Tariff to direct Participating TOs how to operate \ntheir transmission lines and facilities and other electric plant affecting the \nreliability of those lines and facilities for the purpose of affording comparable \nnondiscriminatory transmission access and meeting Applicable Reliability \nCriteria. \n \n3.70 \nOriginal Participating TO. A Participating TO that was a Participating TO as \nof January 1, 2000. The Original Participating TOs are Pacific Gas and Electric \nCompany, Southern California Edison Company, and San Diego Gas & Electric \nCompany. \n \n3.71 \nParticipating TO (“PTO”). A party to the TCA whose application under Section \n2.2 of the TCA has been accepted and who has placed, or expects to place, its \ntransmission assets and/or Entitlements under the CAISO’s Operational Control in \naccordance with the TCA. A PTO may be an Original Participating TO or a New \nParticipating TO. For the purposes of this Tariff, the Participating TO is LS \nPower Grid. \n \n3.72 \nPhysical Scheduling Plant. A group of two or more related Generating Units \neach of which is individually capable of producing Energy, but which either by \nphysical necessity or operational design must be operated as if they were a \nsingle Generating Unit and any Generating Unit or Units containing related \nmultiple generating components which meet one or more of the following \ncriteria: (i) multiple generating components are related by a common flow of \nfuel which cannot be interrupted without substantial loss of efficiency of the \ncombined output of all components; (ii) the Energy production from one \ncomponent necessarily causes Energy production from other components; (iii) \nthe operational arrangement of related multiple generating components \ndetermines the overall physical efficiency of the combined output of all \ncomponents; (iv) the level of coordination required to schedule individual \ngenerating components would cause the CAISO to incur scheduling costs far in \nexcess of the benefits of having scheduled such individual components \nseparately; or (v) metered output is available only for the combined output of \nrelated multiple generation components and separate generating component \nmetering is either impractical or economically inefficient. \n \n3.73 \nPoint of Withdrawal. Point(s) within the CAISO Balancing Authority Area, or \nfor purposes of scheduling and operating the Day Ahead Market only, the EDAM \nArea where Energy and Ancillary Services are made available to a receiving party"},{"page":27,"startToken":10656,"endToken":11072,"text":"13 \nLS Power Grid TO Tariff \n \n \nunder the CAISO Tariff, for purposes of scheduling and operating the Real-Time \nMarket only, the EIM Area where Energy and Ancillary Services are made \navailable to a receiving party under the CAISO Tariff, or for purposes of the \ndefinition of Large Load only, the point(s) where a non-transmission facility that \nis used to withdraw Energy from the CAISO Controlled Grid to serve an End-\nUser connects to the CAISO Controlled Grid. \n \n3.74 \nProjects.  LS Power Grid’s interest in the approximately       850 megavar \n(“MVAR”) static synchronous condenser (“STATCOM”) project to be located in \nFresno County, California interconnected to the PG&E Gates Substation, and LS \nPower Grid’s interest in the approximately       530 MVAR STATCOM facility \nand associated 500 kilovolt (“kV”) switchyard to be located in Shasta County, \nCalifornia, interconnected to the PG&E Round Mountain to Table Mountain 500 \nkV transmission lines. \n \n3.75 \nProject Proponent. A Market Participant or group of Market Participants that (i) \nadvocates a transmission addition or upgrade; (ii) is unwilling to pay the full cost \nof the proposed transmission addition or upgrade, and thus is not a Project \nSponsor; and (iii) initiates proceedings under the CAISO ADR Procedures to \ndetermine the need for the proposed transmission addition or upgrade. \n \n3.76 \nProject Sponsor. A Market Participant or group of Market Participants or a \nParticipating TO that proposes the construction of a transmission addition or \nupgrade in accordance with Section 24 of the CAISO Tariff. \n3.77 \nRegional Access Charge.  A component of the Access Charge determined by \nthe CAISO under Section 26.1 of the CAISO Tariff. \n \n3.78 \nRegional Transmission Facility. A transmission facility under the Operational \nControl of the CAISO that is owned by the Participating TO or to which the \nParticipating TO has an Entitlement that may be associated with a Converted \nRight, which operates at a voltage at or above 200 kilovolts, and supporting \nfacilities, and the costs of which are not directly assigned to one or more specific \ncustomers. \n \n3.79 \nRegional Transmission Group (“RTG”). A voluntary organization approved by \nFERC and composed of transmission owners, transmission users, and other \nentities, organized to efficiently coordinate the planning, expansion, and use of \ntransmission on a regional and inter-regional basis. \n3.80 \nRegional Transmission Revenue Requirement. The portion of the Participating \nTO’s TRR associated with and allocable to the Participating TO’s Regional \nTransmission Facilities and Rights associated with Regional Transmission \nFacilities. \n \n3.81 \nRegional Utility-Specific Rate. The Participating TO’s Regional Transmission"},{"page":28,"startToken":11072,"endToken":11484,"text":"14 \nLS Power Grid TO Tariff \n \n \nRevenue Requirement divided by the Participating TO’s forecast of its Gross \nLoad. \n \n3.82 \nRegional Wheeling Access Charge. The Wheeling Access Charge assessed by \nthe CAISO associated with the recovery of the Participating TO’s Regional \nTransmission Revenue Requirement in accordance with Section 26.1 of the \nCAISO Tariff. \n \n3.83 \nRegulation. The service provided either by Generating Units certified by the \nCAISO as equipped and capable of responding to the CAISO’s direct digital \ncontrol (AGC) signals, or by System Resources that have been certified by the \nCAISO as capable of delivering such service to the CAISO Balancing Authority \nArea, in an upward and downward direction to match, on a Real Time basis, \nDemand and resources, consistent with established NERC and WECC reliability \nstandards, including any requirements of the Nuclear Regulatory Commission. \nRegulation is used to control the Power output of electric generators within a \nprescribed area in response to a change in system frequency, tie-line loading, or \nthe relation of these to each other so as to maintain the target system frequency \nand/or the established interchange with other Balancing Authority Areas within \nthe predetermined Regulation Limits. Regulation includes both the increase of \noutput by a Generating unit or System Resource (Regulation Up) and the decrease \nin output by a Generating unit or System Resource (Regulation Down). \nRegulation Up and Regulation Down are distinct capacity products, with \nseparately stated requirements and ASMPs in each Settlement Period. \n \n3.84 \nRegulatory Authority. The Federal Energy Regulatory Commission. \n \n3.85 \nReliability Criteria. Pre-established criteria that are to be followed in order to \nmaintain desired performance of the CAISO Controlled Grid under \ncontingency or steady state conditions. \n \n3.86 \nReliability Upgrade. The transmission facilities, other than Direct \nAssignment Facilities, beyond the first point of Interconnection necessary to \naccomplish a TSWL Interconnection safely and reliably to the CAISO \nControlled Grid, which would not have been necessary but for the TSWL \nInterconnection, including network upgrades necessary to remedy short circuit \nor stability problems resulting from the TSWL Interconnection. Reliability \nUpgrades also include, consistent with WECC practice, the facilities necessary \nto mitigate any adverse impact a TSWL Interconnection may have on a path’s \nWECC path rating. Reliability Upgrades shall be specified in the \nInterconnection Agreement that governs a TSWL Interconnection and shall be \nsubject to FERC approval. \n \n3.87 \nRequest for Expedited Interconnection Procedures.  A written request by \nwhich an applicant for TSWL Interconnection can request expedited \nprocessing of its TSWL Interconnection Application."},{"page":29,"startToken":11484,"endToken":11840,"text":"15 \nLS Power Grid TO Tariff \n \n \n \n3.88 \nScheduling Coordinator. An entity certified by the CAISO for the \npurpose of undertaking the functions specified in Section 4.5 of the \nCAISO Tariff. \n \n3.89 \nScheduling Point. A location at which the CAISO Controlled Grid or a \ntransmission facility owned by a Transmission Ownership Right holder is \nconnected, by a group of transmission paths for which a physical, non-\nsimultaneous transmission capacity rating has been established for Congestion \nManagement, to transmission facilities that are outside the CAISO’s Operational \nControl. \n \n3.90 \nSite Control. An ECLL may demonstrate that its Large Load Customer has Site \nControl by: \n(a) \nan option for a lease or an executed lease for real property of sufficient \nsize to house the Large Load; or \n(b) \nan option to purchase or title to real property of sufficient size to house the \nLarge Load. \n \n3.91 \nSpinning Reserve. The portion of unloaded synchronized generating capacity \nthat is immediately responsive to system frequency and that is capable of \nbeing loaded in ten minutes, and that is capable of running for at least two \nhours. \n \n3.92 \nSystem Impact Study. An engineering study conducted to determine whether \na request for Interconnection to the CAISO Controlled Grid would require new \ntransmission additions, upgrades, or other mitigation measures. \n \n3.93 \nSystem Impact Study Agreement. An agreement between a Participating \nTO and an entity that has requested Interconnection to the Participating TO’s \ntransmission system pursuant to which the entity requesting Interconnection \nagrees to reimburse the Participating TO for the cost of performing or \nreviewing a System Impact Study. \n \n3.94 \nTO Tariff. This Transmission Owner Tariff, as it may be amended or superseded. \n \n3.95 \nTransmission Control Agreement (“TCA”). The agreement between the \nCAISO and Participating TOs establishing the terms and conditions under which \nTOs will become Participating TOs and how the CAISO and each Participating \nTO will discharge its respective duties and responsibilities, as may be modified \nfrom time to time. \n \n3.96 \nTransmission Owner (“TO”).  An entity owning transmission facilities or \nhaving firm contractual rights to use transmission facilities. \n \n3.97 \nTransmission Revenue Balancing Account (“TRBA”).  A mechanism"},{"page":30,"startToken":11840,"endToken":12271,"text":"16 \nLS Power Grid TO Tariff \n \n \nestablished by the Participating TO which will ensure that all Transmission \nRevenue Credits and other credits specified in the CAISO Tariff, and all amounts \nthat a Cost Recovery Agreement requires to be credited through the TRBAA, \nflow through to CAISO Tariff and TO Tariff transmission customers. \n \n3.98 \nTransmission Revenue Balancing Account Adjustment (“TRBAA”).  A \nmechanism established by the Participating TO which will ensure that all \nTransmission Revenue Credits and other credits specified in Sections 6 and 8 of \nAppendix F, Schedule 3 of the CAISO Tariff, and all amounts that a Cost \nRecovery Agreement requires to be credited through the TRBAA, flow through to \nCAISO Tariff and TO Tariff transmission customers. \n \n3.99 \nTransmission Revenue Credit. The proceeds received from the CAISO (other \nthan for the recovery of the Participating TO’s Regional Transmission Revenue \nRequirement through the Regional Transmission Access Charges).  \n \n3.100 Transmission Revenue Requirement (“TRR’). The total annual authorized \nrevenue requirement associated with 1) transmission facilities and Entitlements \nturned over to the Operational Control of the CAISO by the Participating TO or \n2) the transmission facilities that are not yet in operation, but have been approved \nunder Section 24 and assigned to an Approved Project Sponsor. The costs of any \ntransmission facility turned over to the Operational Control of the CAISO shall \nbe fully included in the Participating TO’s TRR.  The TRR includes the costs of \ntransmission facilities and Entitlements and deducts Transmission Revenue \nCredits and is shown in Appendix I. \n \n3.101 Transmission System Wholesale Load (“TSWL”) Interconnection. The \ninterconnection of the transmission facilities of the Participating TO to the \ntransmission facilities of a Transmission Owner, electric utility, or other entity \neligible to request interconnection. A TSWL Interconnection does not include a \nGenerator Interconnection or an ECLL Interconnection. \n \n3.102 TSWL Interconnection Application. An application that requests a TSWL \nInterconnection to the CAISO Controlled Grid, including any modifications to \nexisting points of interconnection. \n \n3.103 Uncontrollable Force. Any act of God, labor disturbance, act of the public \nenemy, war, insurrection, riot, fire, storm, flood, earthquake, explosion, any \ncurtailment, order, regulation or restriction imposed by governmental, military or \nlawfully established civilian authorities or any other cause beyond the reasonable \ncontrol of the CAISO, a Market participant, or the Participating TO, as the case \nmay be, which could not be avoided through the exercise of Good Utility Practice. \n \n3.104 Utility Distribution Company (“UDC”).  An entity that owns a Distribution \nSystem for the delivery of Energy to and from the CAISO Controlled Grid, and/or \nthat provides regulated retail electric service to End-Users."},{"page":31,"startToken":12271,"endToken":12710,"text":"17 \nLS Power Grid TO Tariff \n \n \n3.105 Voltage Support. Services provided by Generating Units or other equipment such \nas shunt capacitors, static var compensators, or synchronous condensers that are \nrequired to maintain established grid voltage criteria. This service is required \nunder normal or system emergency conditions. \n \n3.106 Western Electricity Coordinating Council (“WECC”).  The Western \nElectricity Coordinating Council or its successor. \n \n3.107 Wheeling Access Charge. The charge assessed by the CAISO that is paid by a \nScheduling Coordinator for Wheeling in accordance with Section 26.1 of the \nCAISO Tariff. Wheeling Access Charges shall not apply for Wheeling under a \nbundled non-economy Energy coordination agreement of a Participating TO \nexecuted prior to July 9, 1996. The Wheeling Access Charge consists of a \nRegional Wheeling Access Charge and, if applicable, a Local Wheeling Access \nCharge. \n \n3.108 Wheeling Out. Except for Existing Rights exercised under an Existing \nContract in accordance with Section 16.1 of the CAISO Tariff, the use of the \nCAISO Controlled Grid for the transmission of Energy from a Generating Unit \nlocated within the CAISO Controlled Grid to serve a Load located outside the \ntransmission and Distribution System of a Participating TO. \n \n3.109 Wheeling Through. Except for Existing Rights exercised under an Existing \nContract in accordance with Section 16.1 of the CAISO Tariff, the use of the \nCAISO Controlled Grid for the transmission of Energy from a resource \nlocated outside the CAISO Controlled Grid to serve a Load located outside the \ntransmission and Distribution System of a Participating TO. \n \n3.110 Wheeling. Wheeling Out or Wheeling Through. \n \n3.111    \nWholesale Customer. A person wishing to purchase Energy and \nAncillary Services at a Bulk Supply Point or a Scheduling Point for resale. \n \n4. \nEligibility for Service. Transmission service over a Participating TO’s system shall be \nprovided only to Eligible Customers for transmission service under the CAISO Tariff.  Any \ndispute as to whether an entity that resells power is eligible for an interconnection under this TO \nTariff shall be resolved by the FERC. Any dispute as to whether an End-User is eligible for an \ninterconnection under this TO Tariff will be resolved by the Local Regulatory Authority. \n \n5. \nAccess Charges and Transmission Rates. The applicable Access Charges are \nprovided in the CAISO Tariff. \n \n5.1 \nWheeling Access Charge. The Wheeling Access Charge shall be determined in \naccordance with the CAISO Tariff. The Wheeling Access Charge assessed by the \nCAISO consists of a Regional Wheeling Access Charge and, if applicable, a \nLocal Wheeling Access Charge.  Wheeling revenues are disbursed by the CAISO \nto Participating TOs pursuant to Section 26.1.4.3 of the CAISO Tariff."},{"page":32,"startToken":12710,"endToken":13109,"text":"18 \nLS Power Grid TO Tariff \n \n \n \n5.2 \nTransmission Revenue Requirement.  Appendix F, Schedule 3, Section 6 of the \nCAISO Tariff provides the Transmission Revenue Requirement for each \nParticipating TO to be used to develop the Access Charges. LS Power Grid’s TRR \nis set forth in Appendix I. \n \n5.3 \nTransmission Revenue Balancing Account Adjustment (“TRBAA”). The \nParticipating TO shall maintain a Transmission Revenue Balancing Account with \nan annual TRBAA that will ensure that all Transmission Revenue Credits and \nadjustments for any over-or under-recovery of its annual Transmission Revenue \nRequirement, if any, specified in Sections 6, 8 and 13 of Appendix F, Schedule 3 \nof the CAISO Tariff, flow through to transmission customers. The TRBAA used \nto calculate the Regional Transmission Revenue Requirement shall include other \nadjustments specified in Appendix F, Schedule 3, Sections 6, 8 and 13 of the \nCAISO Tariff. The TRBAA shall also ensure that all amounts that a Cost \nRecovery Agreement requires to be credited to transmission customers through \nthe TRBAA flow through to transmission customers. \n \nThe TRBAA shall be equal to: \nTRBAA = Cr + Cf + I \nWhere: \n \nCr =  The principal balance in the Transmission Revenue Balancing Account \n(“TRBA”) recorded in FERC Account No. 254 as of September 30 of the \nyear prior to commencement of the January billing cycle. This balance \nrepresents the unamortized balance in the TRBA from the previous \nperiod and the difference in the amount of revenues or expenditures from \nTransmission Revenue Credits, amounts recorded in the TRBA under any \nCost Recovery Agreement, and any over- or under-recovery of its annual \nTransmission Revenue Requirement and the amount of such revenues or \nexpenditures that has been refunded to or collected from customers \nthrough operation of the TRBAA; \n \nCf =  The forecast of Transmission Revenue Credits, if any, for the \nfollowing calendar year, plus any forecast credit that a Cost Recovery \nAgreement requires to be included in the TRBAA for the following \ncalendar year; \n \nI =  \nThe interest balance for the TRBA, which shall be calculated using the \ninterest rate pursuant to Section 35.19a of FERC’s regulations under the \nFederal Power Act (18 CFR Section 35.19a). Interest shall be calculated \nbased on the average TRBA principal balance each month, compounded \nquarterly. Amounts recorded in the TRBA under any Cost Recovery \nAgreement shall be included in the TRBA principal balance for purposes \nof this calculation. Nothing in this Section 5.3 requires the payment of"},{"page":33,"startToken":13109,"endToken":13539,"text":"19 \nLS Power Grid TO Tariff \n \n \ninterest between the Participating TO and a party to a Cost Recovery \nAgreement on amounts payable or refundable under that agreement, \nwhich shall be governed solely by the terms of the Cost Recovery \nAgreement; and \n \nThe LS Power Grid TRBAA, calculated in accordance with the CAISO Tariff \nand approved by the FERC in accordance with Appendix F, Schedule 3, \nSection 9, is stated in Appendix I.  To ensure the TRBA is effective each \nJanuary 1, LS Power Grid shall file the TRBAA no later than October 15th of \neach calendar year. \n \n6. \nAncillary Services - Applicability and Charges. Ancillary Services are needed to \nmaintain reliability within the CAISO Controlled Grid. If any Ancillary Services are \nrequired, LS Power Grid will not provide such services directly to the transmission \ncustomer and the transmission customer will be required to meet any such requirement in \naccordance with the CAISO Tariff. \n \n7. \nBilling and Payment. \n \n7.1 \nThe CAISO, in accordance with the CAISO Tariff, shall pay the Participating \nTO, among other things, all applicable Access Charge revenues and Wheeling \nrevenues in connection with the Project and any other transmission facility \nowned by the Participating TO and placed under the operational control of the \nCAISO. \n \n7.2 \nUsers of LS Power Grid’s Regional Transmission Facilities and Entitlements \nplaced under the CAISO’s Operational Control shall pay to the CAISO all \napplicable charges in accordance with the CAISO Tariff.   \n \n8. \nObligation to Interconnect or Construct Transmission Expansions and Facility \nUpgrades.  Unless LS Power Grid is the lead Participating TO with respect to an \nInterconnection, the provisions of Section 8 of this TO Tariff, and its subparts, shall \nhave no application to the Project or any other Regional Transmission Facilities, or \nEntitlements turned over to the CAISO’s operational control by LS Power Grid, and the \ncorresponding provisions of the lead Participating TO’s TO Tariff shall govern. \n \n8.1 \nParticipating TO Obligation to Interconnect. The Participating TO shall, at \nthe request of a third party, interconnect its system to the wholesale Generating \nFacility or Load of such third party, or modify an existing wholesale \nInterconnection. Interconnections under this TO Tariff shall be available to \nentities eligible to request Interconnection consistent with the provisions of \nSection 210(a) of the FPA. The procedures for the Interconnections of Load to \nthe CAISO Controlled Grid shall be governed by this TO Tariff and the CAISO \nTariff. The procedures for Interconnection of wholesale Generating Facilities to \nthe CAISO Controlled Grid shall be governed by the CAISO Tariff. \n \n8.1.1 Interconnection to Transmission System. Any interconnection must"},{"page":34,"startToken":13539,"endToken":13973,"text":"20 \nLS Power Grid TO Tariff \n \n \nbe consistent with Good Utility Practice, in conformance with all \nApplicable Reliability Criteria, all applicable statutes, regulations, and \nCAISO reliability criteria for the CAISO Controlled Grid. The \nParticipating TO will not accommodate the interconnection if doing so \nwould impair systems reliability, or would otherwise impair the ability \nof the Participating TO to honor its Encumbrances existing as of the \ntime an entity submits its interconnection application. The Participating \nTO shall identify any such adverse effect on its Encumbrances in the \ninterconnection studies. To the extent the Participating TO determines \nthat the interconnection will have an adverse effect on Encumbrances, \nthe party requesting interconnection shall mitigate such adverse effect. \n \n8.1.1.1 Letter Agreement for Generator Interconnections. Pursuant to \nSection 12 of Appendix DD or KK of the CAISO Tariff, prior to \nexecuting a Generator Interconnection Agreement, a party seeking a \nGenerator Interconnection may, in order to advance the implementation \nof its Generator Interconnection, request, and the Participating TO shall \noffer the party, a Letter Agreement that authorizes the Participating TO \nto begin engineering, design, and procurement of long lead-time items, \nor construction necessary for the establishment of the Generator \nInterconnection. However, the Participating TO shall not be obligated \nto offer a Letter Agreement if the party seeking Generator \nInterconnection is in Dispute Resolution as a result of an allegation that \nthe party seeking Generator Interconnection has failed to meet any \nmilestones or comply with any prerequisites specified in the CAISO \nTariff. The Letter Agreement is an optional procedure. The Letter \nAgreement shall provide for the party seeking Generator \nInterconnection to pay the cost of all activities authorized by the party \nand to make advance payments or provide other satisfactory security \nfor such costs. \n \n \nFollowing a party seeking Generator Interconnection’s request for a \nLetter Agreement, the Participating TO shall prepare and tender to the \nparty seeking Generator Interconnection a draft Letter Agreement, \nincluding draft exhibits that include the proposed scope of work, \nestimated costs, payments, financial security and milestones, as \napplicable. The party seeking Generator Interconnection shall provide \nwritten comments, or notification of no comments, to the draft exhibits \nwithin thirty (30) Calendar Days. The Participating TO and the party \nseeking Generator Interconnection shall negotiate concerning any \ndisputed provisions of the exhibits to the draft Letter Agreement for not \nmore than ninety (90) Calendar Days after the Participating TO tenders \nthe draft Letter Agreement to the party seeking Generator \nInterconnection. If the party seeking Generator Interconnection \ndetermines that negotiations are at an impasse, it may request \ntermination of the negotiations at any time after tender of the draft"},{"page":35,"startToken":13973,"endToken":14388,"text":"21 \nLS Power Grid TO Tariff \n \n \nLetter Agreement and request submission of the unexecuted Letter \nAgreement with FERC or initiate dispute resolution procedures \npursuant to Section 14 of this TO Tariff. If the party seeking Generator \nInterconnection requests termination of the negotiations, but within \nninety (90) Calendar Days after the Participating TO tenders the draft \nLetter Agreement to the party seeking Generator Interconnection, fails \nto request either the filing of the unexecuted Letter Agreement or \ninitiate dispute resolution procedures, it shall be deemed to have \nwithdrawn its request for a Letter Agreement and the Participating TO \nshall have no further obligation to enter into a Letter Agreement, unless \nan extension is mutually agreed to by the parties. The Participating TO \nshall provide to the party seeking Generator Interconnection a final \nLetter Agreement within fifteen (15) Business Days after the \ncompletion of the negotiation process. \n \n \nFollowing submission of the final Letter Agreement to the party \nseeking Generator Interconnection, the party shall either: (i) execute \ntwo originals of the tendered Letter Agreement and return them to the \nParticipating TO; or (ii) request in writing that the Participating TO file \nwith FERC a Letter Agreement in unexecuted form. As soon as \npracticable, but not later than ten (10) Business Days after receiving \neither the two executed originals of the tendered Letter Agreement or \nthe request to file an unexecuted Letter Agreement, the Participating \nTO shall file the Letter Agreement with FERC, together with its \nexplanation of any matters as to which the party seeking Generator \nInterconnection and the Participating TO disagree and support for the \ncosts that the Participating TO proposes to charge to the party seeking \nGenerator Interconnection under the Letter Agreement. An unexecuted \nLetter Agreement should contain terms and conditions deemed \nappropriate by the Participating TO for the Generator Interconnection \nrequest. \n \n \nIf the party seeking Generator Interconnection executes the final Letter \nAgreement, the Participating TO and the party seeking Generator \nInterconnection shall perform their respective obligations in accordance \nwith the terms of the Letter Agreement, subject to modification by \nFERC. Upon submission of an unexecuted Letter Agreement, the party \nseeking Generator Interconnection and the Participating TO shall \npromptly comply with the unexecuted Letter Agreement, subject to \nmodification by FERC. \n \n8.1.2 Costs Associated with Interconnection. Each party requesting \nInterconnection shall pay the costs of planning, installing, owning, \noperating, and maintaining any Direct Assignment Facilities and, if \napplicable, any Reliability Upgrades required to provide the requested \nInterconnection, except as provided in Appendix DD of the CAISO"},{"page":36,"startToken":14388,"endToken":14810,"text":"22 \nLS Power Grid TO Tariff \n \n \nTariff. In addition, such party shall implement all existing operating \nprocedures necessary to safely and reliably interconnect such party’s \nGenerating Facility or wholesale Load to the facilities of the \nParticipating TO and to ensure the CAISO Controlled Grid’s \nconformance with the CAISO Grid Planning Criteria, and shall bear all \ncosts of implementing such operating procedures, except as provided in \nAppendix DD of the CAISO Tariff. Any additional costs associated \nwith accommodating the Interconnection shall be allocated in \naccordance with the cost responsibility methodology set forth in the \nCAISO Tariff for transmission expansions or upgrades. \n \n8.1.3 Interconnection Agreement. Interconnection Agreements shall be \ntendered, executed, and filed as provided in Sections 10.9 and 10A.3. \n \n8.1.4 Due Diligence to Construct. The Participating TO shall use due \ndiligence to construct, within a reasonable time, any Direct Assignment \nFacilities and any Reliability Upgrades that it is obligated to construct \npursuant to this TO Tariff and Section 24 and Appendix DD of the \nCAISO Tariff. The Participating TO’s obligation to build will be subject \nto: (1) its ability, after making a good faith effort, to obtain any \nnecessary approvals and property rights under applicable federal, state, \nand local laws; (2) the presence of a cost recovery mechanism with cost \nresponsibility assigned in accordance with the CAISO Tariff or \napplicable FERC precedent; and (3) a signed Interconnection \nAgreement, Engineering and Procurement Agreement, or, by mutual \nagreement of the parties, FERC acceptance for filing of an unexecuted \nInterconnection Agreement. \n \n8.1.5 Energization. The Participating TO shall not be obligated to energize, \nnor shall the applicant or wholesale load be entitled to have its \ninterconnection to the CAISO Controlled Grid energized, unless and \nuntil an Interconnection Agreement has been executed, or filed at \nFERC pursuant to Section 8.1.3, and become effective and such \napplicant or wholesale load has demonstrated to the CAISO’s \nreasonable satisfaction that it has complied with all of the requirements \nof the CAISO Tariff and the requirements of this TO Tariff. \n \n8.1.6 Coordination with CAISO on Interconnection Requests. The \nParticipating TO shall coordinate with the CAISO, pursuant to the \nprovisions of the TCA and CAISO Tariff.   \n \n8.2 \nParticipating TO Obligation to Construct Transmission Expansions or \nFacility Upgrades. The Participating TO shall be obligated to build transmission \nadditions and facility upgrades where the Participating TO is obligated to \nconstruct or expand facilities in accordance with and subject to the limitations \nunder Section 24 of the CAISO Tariff and this TO Tariff."},{"page":37,"startToken":14810,"endToken":15265,"text":"23 \nLS Power Grid TO Tariff \n \n \n \n8.2.1 Obligation to Construct. A Participating TO shall not be obligated to \nconstruct or expand transmission facilities or system upgrades unless \nand until the conditions stated in Section 9.2.1 hereof have been \nsatisfied. \n \n8.3 \nRequest for FERC Deference Regarding Need Determination. It is intended \nthat FERC grant substantial deference to the factual determinations of the \nCAISO, (including the CAISO’s ADR Procedures), the CPUC, WECC, or RTG \ncoordinated planning processes as to the need for or construction of a facility, the \nneed for full cost recovery, and the allocation of costs. \n \n9. \nParticipating TO Process for Construction or Expansion of Transmission Facilities.  \nUnless LS Power Grid is the lead Participating TO with respect to a required system \nexpansion, the provisions of Section 9 of this TO Tariff, and its subparts, shall have no \napplication to the Project or any other Regional Transmission Facilities, Local \nTransmission Facilities, or Entitlements turned over to the CAISO’s operational control \nby LS Power Grid and the corresponding provisions of the lead Participating TO’s TO \nTariff shall govern. Facilities, Local Transmission Facilities, or Entitlements turned over \nto the CAISO’s operational control by LS Power Grid and the corresponding provisions \nof the lead Participating TO’s TO Tariff shall govern. \n \n9.1 \nApplicability and  \nDetermination of Facilities. A Participating TO shall \nperform a study in accordance with the Section where the Participating TO is \nobligated to construct or expand facilities in accordance with Section 24 and \nAppendix DD of the CAISO Tariff and this TO Tariff (other than if the \nobligation to expand or construct is pursuant to Section 10 or 10A of this TO \nTariff or the CAISO’s generator interconnection procedures). \n \n9.2 \nObligation to Build. \n \n9.2.1 Due Diligence to Construct. Subject to Section 9.3 of this TO Tariff, \nthe Participating TO shall use due diligence to construct, within a \nreasonable time, additions or upgrades to its transmission system that it \nis obligated to construct pursuant to the CAISO Tariff and this TO \nTariff.  \n \n9.2.2 Delay in Construction or Expansion. If any event occurs that will \nmaterially affect the time for completion of new facilities, or the ability \nto complete them, the Participating TO shall promptly notify the CAISO \nwith regard to facilities determined to be needed.  The Participating TO \nalso shall make available to such Project Sponsor and the CAISO, as the \ncase may be, studies related to the cause and extent of the delay and the \nParticipating TO’s ability to complete the new facilities, and evaluate \nany options available. The Participating TO also shall make available to \nsuch Project Sponsor and the CAISO, as the case may be, studies \nreasonably needed to evaluate the alternatives."},{"page":38,"startToken":15265,"endToken":15696,"text":"24 \nLS Power Grid TO Tariff \n \n \n \n9.3 \nProvisions Relating To Transmission Construction On the System Of Other \nTOs.  A Participating TO shall not be responsible for making arrangements for \nany engineering, permitting, and construction of transmission or distribution \nfacilities on the system(s) of any other entity or for obtaining any regulatory \napproval for such facilities.  The Participating TO will undertake reasonable \nefforts through the coordinated planning process to assist in making such \narrangements, including, without limitation, providing any information or data \nrequired by such other electric system pursuant to Good Utility Practice. \n \n10. \nTSWL Interconnection Process.  All requests for TSWL Interconnection with the \nProjects or any other Regional Transmission Facilities, or Entitlements turned over to the \nCAISO’s operational control by LS Power Grid shall be directed to the Participating TO. \n \n10.1 \nApplicability. All requests for TSWL Interconnection directly to the CAISO \nControlled Grid from parties eligible to request such Interconnection consistent \nwith Section 210(a) of the FPA shall be processed pursuant to the provisions of \nthis Section 10. All requests for Interconnection of wholesale generation directly \nto the CAISO Controlled Grid shall be processed pursuant to the provisions of the \nCAISO Tariff. Requests for interconnection submitted by an ECLL on behalf of \nLarge Load Customers shall be processed pursuant to Section 10A of this TO \nTariff. \n \n10.2 \nTSWL Interconnection Applications. An applicant requesting TSWL \nInterconnection shall submit a written TSWL Interconnection Application which \nprovides the information detailed below to the Participating TO. The Participating \nTO shall timestamp the application to establish study priority. \n(i) \nthe identity, address, telephone number, and email of the applicant \nrequesting TSWL Interconnection; \n(ii) \nthe Interconnection point(s) to the CAISO Controlled Grid contemplated \nby the applicant; \n(iii) \nthe resultant (or new) maximum amount of TSWL Interconnection \ncapacity contemplated by the applicant; \n(iv) \nthe proposed date for energizing the TSWL Interconnection and the term \nof the interconnection service; and \n(v) \nsuch other information as the Participating TO reasonably requires to \nprocess the application. \n \nIn addition to the information specified above, the following information may also \nbe provided in order to properly evaluate system conditions: \n(vi) \nIf the applicant is a wholesale load, the electrical location of the source of \nthe power (if known) to be transmitted pursuant to applicant’s request for \nInterconnection. If the source of the power is not known, a system \npurchase will be assumed. If the location of the load is not known, a \nsystem sale will be assumed; and, in addition, if an applicant proposes to \nperform or cause a third party to perform any required System Impact"},{"page":39,"startToken":15696,"endToken":16117,"text":"25 \nLS Power Grid TO Tariff \n \n \nStudy or any required Facilities Study, it shall so indicate in its TSWL \nInterconnection Application. The results of any study or studies performed \nby an applicant must be approved by both the CAISO and the Participating \nTO. \n \nWithin ten (10) Business Days after receipt of a TSWL Interconnection \nApplication, the Participating TO and the CAISO if applicable shall determine \nwhether the application is complete (“Completed TSWL Interconnection \nApplication”). Whenever possible, the Participating TO will attempt to remedy \ndeficiencies in the TSWL Interconnection Application through informal \ncommunications with the applicant. If such efforts are unsuccessful, the \nParticipating TO shall return the TSWL Interconnection Application to the \napplicant. \n \nThe Participating TO will treat the information in the TSWL Interconnection \nApplication, including the applicant’s identity, as confidential at the request of the \napplicant except to the extent that disclosure of the information is required by this \nTO Tariff, by regulatory or judicial order, for reliability purposes pursuant to \nGood Utility Practice, or pursuant to RTG or CAISO transmission information \nsharing agreements. The Participating TO shall treat this information consistent \nwith the standards of conduct contained in Part 37 of FERC’s regulations. \n \n10.2.1 Amendment to Completed TSWL Interconnection Application. An \napplicant shall only be limited to amending its Completed TSWL \nInterconnection Application once. Such amendment shall occur on or \nbefore ten (10) Business Days following the date the Participating TO \ntenders any Facilities Study Agreement. Specifically, an applicant may \nsubmit an amendment to its Completed TSWL Interconnection \nApplication to reflect a revised configuration for its New Facility. The \namended Completed TSWL Interconnection Application shall be treated in \naccordance with Section 25 of the CAISO Tariff and Section 10.4 of this \nTO Tariff; the applicant’s Completed TSWL Interconnection Application \nshall be deemed withdrawn; and the applicant shall maintain its existing \nqueue position, if (a) the amended Completed TSWL Interconnection \nApplication is received by the Participating TO within ten (10) Business \nDays of the Participating TO’s tender of a Facilities Study Agreement; and \n(b) the applicant has not submitted a previous amendment to the \nCompleted TSWL Interconnection Application. In the event an applicant \namends its Completed TSWL Interconnection Application, it will be \nresponsible for any additional study costs that result from that amendment, \nincluding costs associated with revisions to studies for other applicants \nholding later queue positions. \n \n10.3 \nReview of Completed TSWL Interconnection Application. After receiving a \nCompleted TSWL Interconnection Application, the Participating TO and the \nCAISO, if applicable, will determine on a non-discriminatory basis whether a"},{"page":40,"startToken":16117,"endToken":16611,"text":"26 \nLS Power Grid TO Tariff \n \n \nSystem Impact Study is required. Whenever the Participating TO, and the CAISO, \nif applicable, determines that a System Impact Study is not required and that \nneither Reliability Upgrades nor changes in existing operating procedures are \nrequired, the Participating TO shall notify the applicant within fifteen (15) \nBusiness Days of the Completed Application Date. If the TSWL Interconnection \ncan be accommodated without any Direct Assignment Facilities, then within \nthirty (30) Business Days of such notice from the Participating TO, the applicant \nshall request the Participating TO to tender to the applicant an Interconnection \nAgreement within thirty (30) Business Days of such request. The Participating TO \nshall tender to the applicant an Interconnection Agreement as provided in Section \n10.9. If the Participating TO determines upon review of the Completed TSWL \nInterconnection Application, that Direct Assignment Facilities are required, the \nParticipating TO shall tender to the applicant a Facilities Study Agreement within \ntwenty (20) Business Days of the Completed Application Date and continue the \nInterconnection process pursuant to Section 10.7. \n \n10.4 \nNotice of Need for System Impact Study. If the Participating TO, and the \nCAISO, if applicable, determines that a System Impact Study is necessary to \naccommodate the requested Interconnection, the Participating TO shall so inform \nthe applicant as soon as practicable. In such cases, the Participating TO shall \nwithin twenty (20) Business Days of receipt of a Completed TSWL \nInterconnection Application, tender a System Impact Study Agreement that \ndefines the scope, content, assumptions and terms of reference for such study to \nbe completed by the Participating TO, the estimated time required to complete it, \nand such other provisions as the parties may reasonably require, and pursuant to \nwhich the applicant shall agree to reimburse the Participating TO for the \nreasonable actual costs of performing the required System Impact Study. A \ndescription of the Participating TO’s transmission assessment practices for \ncompleting a System Impact Study shall be provided in the Participating TO’s \nFERC Form 715. \n \nAlternatively, if the applicant will perform the System Impact Study, the \nParticipating TO shall within twenty (20) Business Days of receipt of a \nCompleted TSWL Interconnection Application, tender a System Impact Study \nAgreement that defines the scope, content, assumptions and terms of reference for \nsuch study to be reviewed by the Participating TO; the estimated time required to \ncomplete it; and such other provisions as the parties may reasonably require, and \npursuant to which the applicant shall agree to reimburse the Participating TO for \nthe reasonable actual costs of reviewing the required System Impact Study. \n \nFor a TSWL Interconnection request to remain a Completed TSWL \nInterconnection Application, the applicant shall execute the System Impact Study \nAgreement and return it to the Participating TO within ten (10) Business Days \ntogether with payment for the reasonable estimated cost of performing the System \nImpact Study or reviewing the applicant’s System Impact Study. Alternatively, if \nthe applicant requests the Participating TO to proceed with the System Impact"},{"page":41,"startToken":16611,"endToken":17096,"text":"27 \nLS Power Grid TO Tariff \n \n \nStudy or review thereof and commits to abide by the terms, conditions, and cost \nassignments ultimately determined under the CAISO ADR Procedures, including \nany determination by FERC or appeal of a FERC determination in accordance \nwith that process, the Participating TO shall promptly proceed with the System \nImpact Study provided that such request is accompanied by payment of the \nreasonable estimated cost of the System Impact Study, and the parties shall submit \nthe disputed terms for resolution under the CAISO ADR Procedures. If the \napplicant elects not to execute a System Impact Study Agreement, and does not \nrequest that the Participating TO proceed with the System Impact Study or review \nthereof, its application shall be deemed withdrawn, and the applicant shall \nreimburse to the Participating TO all costs reasonably incurred in processing the \napplication. \n \n10.5 \nSystem Impact Study Cost Reimbursement and Agreement. \n \n10.5.1 Cost Reimbursement. The System Impact Study Agreement shall clearly \nspecify the charge, based on the Participating TO’s estimate of the cost \nand time for completion of the System Impact Study. The charge shall not \nexceed the reasonable actual cost of the study. In performing the System \nImpact Study, the Participating TO shall rely, to the extent reasonably \npracticable, on existing transmission planning studies. The applicant will \nnot be assessed a charge for such existing studies; however, the applicant \nwill be responsible for the reasonable charges associated with any \nmodifications to existing planning studies that are reasonably necessary to \nevaluate the impact on the applicant’s request. \n \n10.6 \nSystem Impact Study Procedures. Upon receipt of an executed System Impact \nStudy Agreement or initiation of the CAISO ADR Procedures and receipt of \npayment for estimated study costs, the Participating TO will use due diligence to \neither (a) complete the required System Impact Study within a sixty (60) calendar \nday period or (b) complete its review of an applicant’s System Impact Study \nwithin thirty (30) calendar days of its receipt of the completed study. The System \nImpact Study will identify whether any Direct Assignment Facilities or Reliability \nUpgrades are necessary to deliver a New Facility’s full output over the CAISO \nControlled Grid, or any transmission additions or upgrades are necessary to serve \na wholesale load. The System Impact Study will also identify any adverse impact \non Encumbrances existing as of the applicant’s Completed Application Date. In \nthe event that the Participating TO is unable to complete the required System \nImpact Study within such time period, it shall so notify the applicant, in writing, \nand provide an estimated completion date along with an explanation of the \nreasons why additional time is required to complete the required studies. A copy \nof the completed System Impact Study and related work papers shall be made \navailable to the applicant and the CAISO. The Participating TO shall notify the \napplicant and the CAISO immediately upon completion of the System Impact \nStudy."},{"page":42,"startToken":17096,"endToken":17616,"text":"28 \nLS Power Grid TO Tariff \n \n \n10.6.1 Procedures Upon Completion of System Impact Study. Within fifteen \n(15) Business Days of completion of the System Impact Study or review \nand approval of an applicant’s System Impact Study, the Participating TO \nshall notify the applicant whether the transmission system will be adequate \nto accommodate all of a request for Interconnection. If no costs are likely \nto be incurred for any Direct Assignment Facilities, any Reliability \nUpgrades, or implementing any operating procedures, then within thirty \n(30) Business Days of receipt of written approval of the applicant’s \nSystem Impact Study from the Participating TO and the CAISO the \napplicant shall request the Participating TO to tender an Interconnection \nAgreement within thirty (30) Business Days of such request. The \nParticipating TO shall tender to the applicant an Interconnection \nAgreement as provided in Section 10.9. If costs are likely to be incurred to \naccommodate a request for Interconnection, the Participating TO shall \ntender to the applicant a Facilities Study Agreement pursuant to Section \n10.7. \n \n10.7 \nNotice of Need for Facilities Study. If a System Impact Study indicates that \nadditions or upgrades to the CAISO Controlled Grid are needed to satisfy an \napplicant’s request for interconnection, the Participating TO shall, within fifteen \n(15) Business Days of the date of the System Impact Study or the completion of \nreview and approval of the applicant’s System Impact Study by the Participating \nTO, tender to the applicant a Facilities Study Agreement that defines the scope, \ncontent, assumptions and terms of reference for such study to be completed by the \nParticipating TO; the estimated time required to complete the required study; and \nsuch other provisions as the parties may reasonably require, and pursuant to \nwhich the applicant agrees to reimburse the Participating TO for the reasonable \nactual costs of performing the required Facilities Study. Alternatively, if the \napplicant will perform the Facilities Study, the Participating TO shall within \nfifteen (15) Business Days of the completion date of the System Impact Study or \nthe completion of review and approval of the applicant’s System Impact Study, \ntender a Facilities Study Agreement that defines the scope, content, assumptions \nand terms of reference for such study to be reviewed by the Participating TO; the \nestimated time required to complete the required review; and such other \nprovisions as the parties may reasonably require, and pursuant to which the \napplicant agrees to reimburse the Participating TO for the reasonable actual costs \nof reviewing the required Facilities Study. For a TSWL Interconnection request to \nremain a Completed TSWL Interconnection Application, the applicant shall \nexecute the Facilities Study Agreement and return it to the Participating TO \nwithin ten (10) Business Days together with payment for the reasonable estimated \ncosts of performing the Facilities Study or reviewing the applicant’s Facilities \nStudy. Alternatively, if the applicant requests the Participating TO to proceed \nwith the Facilities Study or review thereof and commits to abide by terms, \nconditions, and cost assignments ultimately determined under the CAISO ADR \nProcedures, including any determination by FERC or appeal of a FERC \ndetermination in accordance with that process, the Participating TO shall"},{"page":43,"startToken":17616,"endToken":18104,"text":"29 \nLS Power Grid TO Tariff \n \n \npromptly proceed with the Facilities Study provided that such request is \naccompanied by payment for the reasonable estimated cost of the Facilities Study, \nand the parties shall submit the disputed terms for resolution under the CAISO \nADR Procedures. If the applicant elects not to execute a Facilities Study \nAgreement and does not request that the Participating TO proceed with the \nFacilities Study or review thereof, its application shall be deemed withdrawn and \nthe applicant shall reimburse to the Participating TO all costs reasonably incurred \nin processing the application not covered by the System Impact Study Agreement. \n \n10.8 \nFacilities Study Procedures. Upon receipt of an executed Facilities Study \nAgreement or initiation of the CAISO ADR Procedures and receipt of payment \nfor the estimated study costs, the Participating TO will use due diligence to either \n(a) complete the required Facilities Study within a sixty (60) calendar day period \nor (b) complete its review of an applicant’s Facilities Study within thirty (30) \ncalendar days of its receipt of the Completed Study. In the event that Participating \nTO is unable to complete the required Facilities Study within such time period, it \nshall so notify the applicant, in writing, and provide an estimated completion date \nalong with an explanation of the reasons why additional time is required to \ncomplete the required studies. A copy of the completed Facilities Study shall be \nmade available to the applicant. \n \n10.8.1 Tender of Interconnection Agreement. Within thirty (30) Business Days \nof receipt of the completed Facilities Study performed by the Participating \nTO or receipt of written approval of the applicant’s Facilities Study from \nthe Participating TO, the applicant shall request the Participating TO to \ntender an Interconnection Agreement within thirty (30) Business Days of \nsuch request. The Participating TO shall tender to the applicant an \nInterconnection Agreement as provided in Section 10.9. \n \n10.9 \nInterconnection Agreement. Pursuant to Section 10.3, 10.6.1, or 10.8.1, a party \nrequesting TSWL Interconnection shall request in writing that the Participating \nTO tender to such party an Interconnection Agreement that will be filed with \nFERC, or the Local Regulatory Authority, in the case of a Local Publicly Owned \nElectric Utility. The Interconnection Agreement shall include, without limitation, \ncost responsibilities and payment provisions for any engineering, equipment, \nconstruction, ownership, operation and maintenance costs for any Direct \nAssignment Facilities, any Reliability Upgrades, and for any other mitigation \nmeasures. The Interconnection Agreement will set forth a payment schedule that \nenables the Participating TO to recover its costs. \n \nFor a TSWL Interconnection request to remain a Completed TSWL \nInterconnection Application, the applicant requesting the TSWL Interconnection \nor the entity with whom the Participating TO will interconnect for the \nInterconnection shall execute the Interconnection Agreement and return it to the \nParticipating TO within thirty (30) Business Days of receipt. Alternatively, if an \napplicant requesting the TSWL Interconnection or the entity with whom the"},{"page":44,"startToken":18104,"endToken":18575,"text":"30 \nLS Power Grid TO Tariff \n \n \nParticipating TO will interconnect for the Interconnection requests the \nParticipating TO to file an unexecuted Interconnection Agreement and commits to \nabide by the terms, conditions, and cost assignments determined to be just and \nreasonable under the CAISO ADR Procedures, including any determination by \nFERC or on appeal of a FERC determination in accordance with that process, the \nParticipating TO shall promptly file an unexecuted Interconnection Agreement. \nProvided, however, that if the CAISO ADR Procedures concerns whether the \nrequesting entity is eligible for a TSWL Interconnection, the Participating TO \nshall not be obligated to file an unexecuted Interconnection Agreement or \ncommence construction of any facilities or incur other costs under the \nInterconnection Agreement until a final order determining the just and reasonable \nrates, terms, and conditions for such Interconnection Agreement has been issued \nby the applicable court or regulatory authority. If the applicant or the entity with \nwhom the Participating TO will interconnect for the Interconnection elects not to \nexecute the Interconnection Agreement and does not request the Participating TO \nto file an unexecuted Interconnection Agreement, its Completed TSWL \nInterconnection Application shall be deemed withdrawn, and the applicant shall \nreimburse to the Participating TO all costs reasonably incurred in processing the \napplication not covered by any System Impact Study Agreement or Facilities \nStudy Agreement. \n \nWhere a TSWL Interconnection will serve one or more Large Loads, as a \ncondition to the Participating TO’s design, procurement, construction, or \noperation of any Large Load-Driven Upgrades (as defined in the pro forma Large \nLoad Cost Recovery Agreement set forth in Appendix V) associated with the \nTSWL Interconnection, the applicant or Eligible Customer shall also, within the \nsame period and subject to the same consequences as the Interconnection \nAgreement, execute and maintain a Cost Recovery Agreement substantially in the \nform set forth in Appendix V to this TO Tariff, or, if the applicant or Eligible \nCustomer requests that the Cost Recovery Agreement be filed unexecuted with \nFERC, comply with that agreement as made effective by FERC, in each case as \napplicable to the requested TSWL Interconnection. Disputes arising under a Cost \nRecovery Agreement shall be resolved under the dispute resolution provisions of \nthat agreement. \n \n10.10 Partial Interim Service. If the Participating TO determines that there will not be \nadequate transmission capability to satisfy the full amount requested in a \nCompleted TSWL Interconnection Application, the Participating TO nonetheless \nshall be obligated to offer and provide the portion of the requested TSWL \nInterconnection that can be accommodated without any additional Direct \nAssignment Facilities or Reliability Upgrades. However, the Participating TO \nshall not be obligated to provide the incremental amount of requested TSWL \nInterconnection that requires such additional facilities or upgrades until such \nfacilities or upgrades have been placed in service. \n \n10.11 Expedited Interconnection Procedures. In lieu of the procedures set forth"},{"page":45,"startToken":18575,"endToken":19013,"text":"31 \nLS Power Grid TO Tariff \n \n \nabove, the applicant shall have the option to expedite the processing of its \nCompleted TSWL Interconnection Application. In order to exercise this option, \nthe applicant shall submit in writing a Request for Expedited Interconnection \nProcedures to the Participating TO within ten (10) Business Days after receiving a \ncopy of the System Impact Study for the proposed TSWL Interconnection. Within \nten (10) Business Days after receiving a Request for Expedited Interconnection \nProcedures, the Participating TO shall tender an Expedited Interconnection \nAgreement that requires the applicant to compensate the Participating TO for all \ncosts reasonably incurred pursuant to the terms of this TO Tariff for processing \nthe Completed TSWL Interconnection Application and providing the requested \nTSWL Interconnection. While the Participating TO agrees to provide the \napplicant with its best estimate of the costs of any needed Direct Assignment \nFacilities and, if applicable, Reliability Upgrades, and such other charges that may \nbe incurred, unless otherwise agreed by the parties, such estimate shall not be \nbinding and the applicant must agree in writing to compensate the Participating \nTO for all actual TSWL Interconnection costs reasonably incurred pursuant to the \nprovisions of this TO Tariff. The applicant shall execute and return such \nExpedited Interconnection Agreement within ten (10) Business Days of its receipt \nor the applicant’s request for TSWL Interconnection will cease to be a Completed \nTSWL Interconnection Application and will be deemed terminated and \nwithdrawn. In that event, the applicant shall reimburse the Participating TO for all \ncosts reasonably incurred in processing the application not covered by the terms \nof the System Impact Study Agreement. \n \n10A. Interconnection Process for ECLL Interconnections. All requests for ECLL \nInterconnection shall be directed to the Participating TO. \n \n10A.1 Applicability. An ECLL Interconnection must be requested in order to connect \nthe facilities of the Participating TO to the facilities of an ECLL that has received \na request to connect and provide retail transmission service to a Large Load \nCustomer. \n \n10A.2 ECLL Application and Application Fee \n \n10A.2.1 \nApplication Contents. An ECLL requesting an ECLL \nInterconnection shall submit an ECLL Interconnection Application in the \nform of Attachment 1 to Appendix VI, which provides the following \nrequired information, and shall send a copy of the application to the \nCAISO. The ECLL Interconnection Application and all supporting \ndocumentation shall be submitted electronically to the Participating TO in \nthe manner posted on the Participating TO’s public website. \n \n(a) \nthe identity, address, telephone number, and email of the ECLL; \n(b) \nthe Point of Withdrawal; \n(c) \na proposed Large Load Customer load ramp schedule identifying \nanticipated load additions over time and the Large Load"},{"page":46,"startToken":19013,"endToken":19393,"text":"32 \nLS Power Grid TO Tariff \n \n \nCustomer’s maximum load; \n(d) \na site plan; \n(e) \ndocumentation demonstrating that the Large Load Customer has \nSite Control; \n(f) \ndocumentation demonstrating that the Large Load Customer has \nlocal permits and regulatory approvals for development of its Large \nLoad; \n(g) \na single-line electrical diagram; \n(h) \nthe electrical location of the source of the power (if known) to be \ntransmitted pursuant to the ECLL’s request for ECLL \nInterconnection. If the source of the power is not known, a system \npurchase will be assumed; \n(i) \ndisclosure of ECLL interconnection requests in the ECLL’s \nfootprint that are for the same Large Load Customer or any of its \naffiliate(s); \n(j) \na completed technical data form in the form of Appendix A to \nAttachment 1 to Appendix VI; \n(k) \nif the Large Load Customer will be a Co-Located Large Load, \ninformation concerning the relevant Generating Facility must be \nprovided by the ECLL. Such information may be either: (1) if the \nGenerating Facility has not signed a generator interconnection \nagreement, the identifying queue number of the Generating \nFacility; or (2) if the Generating Facility has signed a generator \ninterconnection agreement, information that will allow the \nParticipating TO to identify such agreement; and \n(l) \nthe proposed date for energizing the ECLL Interconnection and the \nproposed term of the ECLL Interconnection service. \n \n10A.2.2 \nParticipating TO Review of ECLL Interconnection \nApplication. Within ten (10) Business Days after receipt of an ECLL \nInterconnection Application, the Participating TO shall determine whether \nthe application is complete (“Completed ECLL Interconnection \nApplication”). Wherever possible, the Participating TO will attempt to \nremedy deficiencies in the ECLL Interconnection Application through \ninformal communications with the ECLL. If such efforts are unsuccessful, \nthe Participating TO shall return the ECLL Interconnection Application to \nthe ECLL. \n \nThe Participating TO will treat the information provided in the ECLL \nInterconnection Application, including the ECLL’s and Large Load \nCustomer’s identity, as confidential at the request of the ECLL except to \nthe extent that disclosure of this information is required by this TO Tariff \nor the CAISO Tariff, by regulatory or judicial order, for reliability \npurposes pursuant to Good Utility Practice, or pursuant to RTG or CAISO \ntransmission information sharing agreements. The Participating TO shall \ntreat this information consistent with the standards of conduct contained in"},{"page":47,"startToken":19393,"endToken":19806,"text":"33 \nLS Power Grid TO Tariff \n \n \nPart 37 of FERC’s regulations. \n \n10A.3 Study Process and ECLL Interconnection Agreement. ECLL Interconnection \nApplications shall be processed, and ECLL Interconnection Agreements shall be \ntendered, executed, and filed, in accordance with the Large Load Interconnection \nProcedures set forth in Appendix VI. Disputes arising under a Cost Recovery \nAgreement shall be resolved under the dispute resolution provisions of that \nagreement. \n \n10A.4 Interim Service \n \n10A.4.1 \nInterim Firm Interconnection Service and Flexible Interim \nLoad Interconnection (FILI) Service. If the ECLL has requested Interim \nFirm Interconnection Service and/or FILI Service, the Participating TO \nshall perform an analysis and report the extent to which the requested \ninterim services can be provided, prior to such time that all ECLL \nInterconnection Facilities are in service and the Large Load Customer is \nauthorized to withdraw Energy. However, the Participating TO shall not \nbe obligated to provide any amount of Firm Interconnection Service \nrequested until necessary facilities have been placed in service. FILI \nService will be available for all remaining Load that cannot receive \nInterim Firm Interconnection Service, if the Large Load Customer has the \nability to reduce the load at a specified point of interconnection according \nto the timelines and protocols set forth in an executed and effective FILI \nService Agreement, until the ECLL Interconnection Facilities are in \nservice. As ECLL Interconnection Facilities are placed into service and \ntransmission interconnection capability is increased, available quantities of \nFirm Interconnection Service and FILI Service will be updated and \nreflected in the applicable FILI Service Agreement. \n \nIf the Large Load Customer seeks FILI Service, the ECLL will ensure that \nthe Large Load Customer signs a FILI Service Agreement developed by \nthe Participating TO, or asks for the agreement to be filed unexecuted. \n \n10A.4.2 \nStudy Process for Interim Service and Determination of \nAvailability of Interim Firm Interconnection Service and FILI \nService. The Participating TO shall perform a FILI Study in accordance \nwith Section 4.6.2 of Appendix VI to determine the maximum amount of \nany Interim Firm Interconnection Service, if any, and FILI Service, if any, \nthat may be provided based on the anticipated availability of transmission \ncapacity once the Large Load Customer is permitted to withdraw energy \nby the ECLL. The Participating TO shall update this analysis under the \nterms of the FILI Service Agreement, at least annually. \n \nThe actual amount of any FILI Service to be provided during any \noperating period shall be determined by the Participating TO through"},{"page":48,"startToken":19806,"endToken":20203,"text":"34 \nLS Power Grid TO Tariff \n \n \noperational assessments and analysis conducted closer to real-time \noperating conditions. Accordingly, the maximum FILI Service established \nin the annual analysis does not guarantee the availability of such service \nunder actual system conditions. \n \n10A.4.3 \nConditions Related to FILI Service \n \n10A.4.3.1 \nFILI Service Reliability Requirements. The FILI Service \nAgreement will identify what ECLL Interconnection Facilities \nmust be installed, the necessary protection and control systems and \nany other equipment necessary to be installed, and operating \nlimitations to allow the Large Load Customer to withdraw energy \n(“FILI Service Reliability Requirements”). FILI Service shall not \ncommence until the Participating TO and ECLL have completed \ninstallation and commissioning of all equipment specified under \nthe FILI Service Agreement. \n \n10A.4.3.2 \nCurtailment of FILI Service. FILI Service is subject to \ncurtailment at all times, unless the Participating TO’s right to \ncurtail is expressly conditioned or otherwise limited in an executed \nand effective FILI Service Agreement. A Large Load Customer \nreceiving FILI Service shall be subject to curtailment prior to any \ncurtailment of customers receiving Firm Interconnection Service. \nThe Participating TO and CAISO may curtail FILI Service as \nnecessary to maintain the reliable operation of the CAISO \nControlled Grid, including during normal operating conditions. \n \n10A.4.3.3 \nExceedance of Authorized FILI Service. An ECLL shall \nensure that the operating instructions issued by the Participating \nTO pursuant to a FILI Service Agreement are not exceeded at the \nrelevant Point of Withdrawal. The Participating TO shall have the \nright to disconnect service to the Large Load Customer in the event \nthat energy withdrawals violate the terms of the FILI Service \nAgreement. The Participating TO shall follow Good Utility \nPractice in carrying out any such disconnection and subsequent \nreconnection when the conditions for such reconnection set forth in \nthe FILI Service Agreement have been met. Nothing in this TO \nTariff prevents the CAISO from applying any financial penalties \napplicable to Large Load Customers. \n \n10A.5 Co-Located Large Load. The interconnection processes applicable to a Co-\nLocated Large Load shall be determined based on whether the Generating Facility \nis a (1) non-exporting Generating Facility interconnected in accordance with the \ngenerator interconnection rules of the applicable ECLL, as approved by its Local \nRegulatory Authority (including, for a UDC subject to the jurisdiction of the \nCPUC, CPUC Electric Rule 21); or (2) an exporting Generating Facility subject to"},{"page":49,"startToken":20203,"endToken":20690,"text":"35 \nLS Power Grid TO Tariff \n \n \nthe applicable CAISO generator interconnection procedures and requirements. \nThe ECLL for a Co-Located Large Load connecting to facilities of an exporting \nGenerating Facility will be subject to this Section 10A. \n \nFor a Co-Located Large Load interconnected to the facilities of an exporting \nGenerating Facility, the CAISO will be a party to a pro forma agreement that \nbridges the pro forma Large Generator Interconnection Agreement (LGIA) with \nthe ECLL Interconnection Agreement, or will negotiate a non-conforming LGIA \nto account for certain details of the Co-Located Large Load interconnection on an \nindividual basis. The Generating Facility developer will also execute a CAISO pro \nforma Participating Generator Agreement for the Generating Facility, but not a \nParticipating Load Agreement for the Co-Located Large Load. \n \n10A.6 Large Load Cost Recovery Agreement. As a condition to the Transmission \nOwner’s design, procurement, construction, or operation of a Large Load-Driven \nUpgrade, the Eligible Customer shall execute and maintain a Large Load Cost \nRecovery Agreement substantially in the form set forth in Appendix V to this TO \nTariff, as applicable to the requested service and associated Large Load Facility. \n \n11. \nUncontrollable Forces and Indemnification \n \n11.1 \nProcedures to Follow If Uncontrollable Force Occurs. In the event of the \noccurrence of an Uncontrollable Force which prevents the Participating TO or a \nMarket Participant from performing any of its obligations under this TO Tariff, \nthe affected entity shall (i) if it is the Participating TO, immediately give notice to \nthe Market Participants in writing of the occurrence of such Uncontrollable Force \nand, if it is a Market Participant, immediately give notice to the Participating TO \nof the occurrence of such Uncontrollable Force; (ii) not be entitled to suspend \nperformance in any greater or longer duration than is required by the \nUncontrollable Force, (iii) use its best efforts to mitigate the effects of such \nUncontrollable Force, remedy its inability to perform, and resume full \nperformance hereunder, (iv) in the case of the Participating TO, keep the Market \nParticipants apprised of such efforts and, in the case of the Market Participants, \nkeep the Participating TO apprised of mitigation efforts, in each case on a \ncontinual basis; and (v) provide written notice of the resumption of performance \nhereunder. Notwithstanding any of the foregoing, the settlement of any strike, \nlockout, or labor dispute constituting an Uncontrollable Force shall be within the \nsole discretion of the entity affected thereby, and the requirement that a \nParticipating TO or Market Participant must use its best efforts to remedy the \ncause of the Uncontrollable Force and mitigate its effects and resume full \nperformance hereunder shall not apply to strikes, lockouts, or labor disputes.  No \nMarket Participant or Participating TO will be considered in default as to any \nobligation under this TO Tariff if prevented from fulfilling the obligation due to \nthe occurrence of an Uncontrollable Force. \n \n11.2 \nIndemnification.  A Market Participant shall at all times indemnify, defend, and"},{"page":50,"startToken":20690,"endToken":21185,"text":"36 \nLS Power Grid TO Tariff \n \n \nsave the Participating TO harmless from any and all damages, losses, claims, \n(including claims and actions relating to injury or to death of any person or \ndamage to property), demands, suits, recoveries, costs and expenses, court costs, \nattorney fees, and all other obligations by or to third parties, arising out of or \nresulting from the Participating TO’s performance of its obligations under this TO \nTariff on behalf of a Market Participant, except in cases of negligence or \nintentional wrongdoing by the Participating TO. \n \n12. \nRegulatory Filings. Nothing contained herein shall be construed as affecting, in any \nway, the right of any electric utility (as defined by the Federal Power Act) Participating \nTO furnishing services in accordance with this TO Tariff, CAISO Tariff or any tariff and \nrate schedule which results from or incorporates this TO Tariff, unilaterally to make \napplication to FERC as it deems necessary and appropriate to recover its Transmission \nRevenue Requirements, or for a change in its rates, including changes in rate \nmethodology, or for a change in designation of transmission facilities to be placed under \nthe CAISO’s control, in each case under Section 205 of the FPA and pursuant to the \nFERC’s Rules and Regulations promulgated thereunder. Nothing contained herein shall \nbe construed as affecting in any way the ability of any Eligible Customer receiving \nservices in accordance with this TO Tariff to exercise its rights under the Federal Power \nAct and pursuant to the FERC’s rules and regulations promulgated thereunder. \n \n12.1 \nOpen Access. For purposes of the Stranded Cost Recovery available under \nOrder Nos. 888 and 888-A, this Tariff, combined with the CAISO Tariff and \nwholesale distribution access tariff, if any, shall be considered an open access \ntariff under FERC Order Nos. 888 and 888-A. \n13. \nCreditworthiness \n13.1 \nUDCs, MSSs, and Scheduling Coordinators Using the Participating TO’s \nLow Voltage Transmission Facilities. For the purpose of determining the ability \nof a UDC, MSS, and Scheduling Coordinator to meet its obligations related to \nusing the Participating TO’s Low Voltage Transmission Facilities hereunder, \nwhere the Participating TO is collecting the Low Voltage Access Charge directly \nfrom each UDC, MSS and Scheduling Coordinator, the Participating TO may \nrequire reasonable credit review procedures for the UDC, MSS, or Scheduling \nCoordinator. This review shall be made in accordance with standard commercial \npractices. In addition, the Participating TO may require the UDC, MSS, or \nScheduling Coordinator to provide and maintain in effect during the term of the \nservice, an unconditional and irrevocable letter of credit as security to meet its \nresponsibilities and obligations under this TO Tariff, or an alternative form of \nsecurity proposed by the UDC, MSS, or Scheduling Coordinator and acceptable \nto the Participating TO, and consistent with commercial practices established by \nthe Uniform Commercial Code, that protect the Participating TO against the risk \nof non-payment. \n13.2 \nEnd-Users. Creditworthiness and security rules applicable to End-Users \nshall be pursuant to the then-current rules of the applicable Local"},{"page":51,"startToken":21185,"endToken":21662,"text":"37 \nLS Power Grid TO Tariff \n \n \nRegulatory Authority and any agreement under this TO Tariff to which \nthe End-User is a party. \n \n14.    Disputes.  Except as limited below, as provided in Sections 10.9 and 10A.3, or as \notherwise limited by law, the CAISO ADR Procedures shall apply to all disputes \nbetween parties which arise under this TO Tariff or under or in respect of the proposed \nterms and conditions of a Facilities Study Agreement, System Impact Study Agreement \nor Expedited Interconnection Agreement. The CAISO ADR Procedures set forth in \nSection 13 of the CAISO Tariff shall not apply to disputes as to whether rates and \ncharges set forth in this TO Tariff (other than charges for studies) are just and reasonable \nunder the FPA. \n \n15. \nMiscellaneous. \n \n15.1 \nNotices. Any notice, demand, or request in accordance with this TO Tariff, \nunless otherwise provided in this TO Tariff, shall be in writing and shall be \ndeemed properly served, given, or made: (i) upon delivery if delivered in person \nor electronically via email, (ii) five days after deposit in the mail if sent by first \nclass United States mail, postage prepaid, (iii) upon receipt of confirmation by \nreturn electronic facsimile if sent by facsimile, or (iv) upon Party at the address \nset forth in Appendix II.  Any Party may at any time, by notice to the other \nParties, change the designation or address of the person specified in Appendix II \nto receive notice on its behalf.  Any notice of a routine character in connection \nwith service under this TO Tariff or in connection with operation of facilities \nshall be given in such a manner as the Parties may determine from time to time, \nunless otherwise provided in this TO Tariff. \n \n15.2 \nWaiver. Any waiver at any time by any Party of its rights with respect to any \ndefault under this TO Tariff, or with respect to any other matter arising in \nconnection with this TO Tariff, shall not constitute or be deemed a waiver with \nrespect to any subsequent default or other matter arising in connection with this \nTO Tariff. Any delay short of the statutory period of limitations in asserting or \nenforcing any right shall not constitute or be deemed a waiver. \n \n15.3 \nConfidentiality. \n \n15.3.1  Maintaining Confidentiality If Not for Public Disclosure. The \nParticipating TO shall maintain the confidentiality of all of the \ndocuments, data, and information provided to it by any other Market \nParticipant that such Market Participant may designate as confidential, \nprovided, however, that the information will not be held confidential by \nthe Participating TO if (1) the Participating TO or Market Participant is \nrequired to provide such information for public disclosure pursuant to \nthis TO Tariff or applicable regulatory requirements, or (2) the \ninformation becomes available to the public on a non-confidential basis \n(other than from the Participating TO)."},{"page":52,"startToken":21662,"endToken":22127,"text":"38 \nLS Power Grid TO Tariff \n \n \n \n15.3.2  Disclosure of Confidential Information. Notwithstanding anything in \nthis Section 15.3 to the contrary, if the Participating TO or any Market \nParticipant is required by applicable laws or regulations, or in the course \nof administrative or judicial proceedings, to disclose information that is \notherwise required to be maintained in confidence pursuant to this \nSection 15.3, the Participating TO or Market Participant may disclose \nsuch information; provided, however, that as soon as such Participating \nTO or Market Participant learns of the disclosure requirement and prior to \nmaking such disclosure, such Participating TO or Market Participant shall \nnotify the affected Participating TO or Market Participants of the \nrequirement and the terms thereof. The affected Participating TO or \nMarket Participants may, at their sole discretion and own costs, direct any \nchallenge to or defense against the disclosure requirement and the \ndisclosing Participating TO or Market Participant shall cooperate with \nsuch affected Participating TO or Market Participants to the maximum \nextent practicable to minimize the disclosure of the information consistent \nwith applicable law. The disclosing Participating TO or Market \nParticipant shall cooperate with the affected Participating TO or Market \nParticipants to obtain proprietary or confidential treatment of confidential \ninformation by the person to whom such information is disclosed prior to \nany such disclosure. \n \n15.4 \nTO Tariff Supersedes Existing Tariffs. This TO Tariff, together with the \nCAISO Tariff and wholesale distribution access tariff if any, supersedes any pre- \nexisting open access transmission tariff of the Participating TO. \n \n15.5 \nTitles. The captions and headings in this TO Tariff are inserted solely to \nfacilitate reference and shall have no bearing upon the interpretation of any of \nthe rates, terms, and conditions of this TO Tariff. \n \n15.6 \nSeverability. If any term, covenant, or condition of this TO Tariff or the \napplication or effect of any such term, covenant, or condition is held invalid as \nto any person, entity, or circumstance, or is determined to be unjust, \nunreasonable, unlawful, imprudent, or otherwise not in the public interest, by \nany court or government agency of competent jurisdiction, then such term, \ncovenant, or condition shall remain in force and effect to the maximum extent \npermitted by law, and all other terms, covenants, and conditions of this TO \nTariff and their application shall not be affected thereby but shall remain in \nforce and effect. The Participating TO and Market Participants shall be relieved \nof their obligations only to the extent necessary to eliminate such regulatory or \nother determination, unless a court or governmental agency of competent \njurisdiction holds that such provisions are not severable from all other \nprovisions of this TO Tariff. \n \n15.7 \nPreservation of Obligations. Upon termination of this TO Tariff, all unsatisfied \nobligations of any entity shall be preserved until satisfied."},{"page":53,"startToken":22127,"endToken":22405,"text":"39 \nLS Power Grid TO Tariff \n \n \n \n15.8 \nGoverning Law. This TO Tariff shall be interpreted, governed by, and construed \nunder the laws of the State of California, without regard to the principles of \nconflict of laws thereof, or the laws of the United States, as applicable, as if \nexecuted and to be performed wholly within the State of California. \n \n15.9 \nAppendices Incorporated. The several appendices to this TO Tariff, as may be \nrevised from time to time, are attached to this TO Tariff and are incorporated by \nreference as if fully set forth herein. \n \n15.10 Conflict With CAISO Tariff.  If a Market Participant identifies a conflict \nbetween the TO Tariff and the CAISO Tariff, the Participating TO and the \nMarket Participant shall make good-faith efforts to resolve the conflict.  If the \nParticipating TO and Market Participant are unable to informally resolve that \nconflict, the Participating TO and Market Participant may use the CAISO ADR \nProcedures to resolve it as set forth in Section 14 of this Tariff. \n \n15.11 Conflicting Operating Instructions. In the event a Market Participant receives \nconflicting operating instructions from the CAISO and one or more Participating \nTO(s), if human safety would not knowingly be neither jeopardized nor electric \nfacilities subject to damage while the Market Participant seeks to reconcile the \nconflict with the appropriate CAISO and Participating TO employees before \nacting, the Market Participant should attempt a reconciliation. Otherwise, the \nMarket Participant shall adhere to CAISO Tariff Section 4.2 and follow the \nCAISO’s instructions. In no event shall a Market Participant be required to \nfollow operating instructions from the CAISO if following those instructions \nwould knowingly jeopardize human safety."},{"page":54,"startToken":22405,"endToken":22775,"text":"1 \nLS POWER GRID CALIFORNIA, LLC \n[PRO FORMA] LARGE LOAD COST RECOVERY AGREEMENT \nThis Large Load Cost Recovery Agreement (this “Agreement”) is entered into as of this __ day \nof _______ 20  , by and between [________], a [●] and an Eligible Customer under the CAISO \nTariff (“Eligible Customer”), and LS Power Grid California, LLC, a Delaware limited liability \ncompany (“LS Power Grid” or “Transmission Owner”). LS Power Grid and Eligible Customer \nare referred to collectively as the “Parties” and individually as a “Party.”  \n[_______], a [●] (“Large Load Customer”), executes the Limited Acknowledgment set forth \nbelow solely for the purposes stated therein and is not a Party to the wholesale payment \nobligations established by this Agreement.  \nRECITALS \nWHEREAS, LS Power Grid is a transmission-only company established to develop, \nown, and operate transmission facilities (“Transmission Facilities”) pursuant to the provisions of \nits Transmission Owner Tariff (“TO Tariff”) and the California Independent System Operator \nCorporation (“CAISO”) Open Access Transmission Tariff (“CAISO Tariff”); \nWHEREAS, Eligible Customer is eligible to take transmission service under the CAISO \nTariff and does or will take such service on behalf of the Large Load Customer, whether or not \nEligible Customer owns or operates an electric distribution system; \nWHEREAS, Eligible Customer and Transmission Owner are parties to, or are entering \ninto, an Eligible Customer for Large Load (“ECLL”) Interconnection Agreement or \nTransmission System Wholesale Load (“TSWL”) Interconnection Agreement (each, an \n“Interconnection Agreement”) concerning the Large Load Facility; \nWHEREAS, Large Load Customer owns, operates, or proposes to develop the Large \nLoad Facility identified in Schedule 1; \nWHEREAS, the Eligible Customer has submitted an ECLL Interconnection Application \nor TSWL Interconnection Application for the interconnection of the Large Load Facility as a \nnew or incremental load; \nWHEREAS, Eligible Customer intends to procure transmission service pursuant to the \nCAISO Tariff and its associated schedules on behalf of Large Load Customer; \nWHEREAS, in connection with the Large Load Facility, Transmission Owner must \nmake additions and/or modifications to its transmission system, including the Large Load-Driven \nUpgrades identified in Schedule 1; \nWHEREAS, CAISO may, under the CAISO Tariff or a Commission-accepted \nmethodology, formally assign to the Large Load Facility a specific share of the costs or revenue \nrequirement of a regional transmission project, and the Parties intend this Agreement to address"},{"page":55,"startToken":22775,"endToken":23186,"text":"2 \n \nthat assigned share without changing any allocation otherwise established under the CAISO \nTariff; \nWHEREAS, the applicable studies may identify impacts on transmission systems other \nthan LS Power Grid’s transmission system and may identify Affected System Upgrades \nnecessary to accommodate or mitigate such impacts; \n \nWHEREAS, Eligible Customer is responsible for entering into and maintaining the \narrangements, payment obligations, and financial security or credit support required by each \napplicable Affected System Owner to ensure that costs and financial risks associated with \nAffected System Upgrades are not shifted to customers that did not cause those costs; \nWHEREAS, Transmission Owner, Eligible Customer, and Distribution Utility have \nexecuted or expect to execute an engineering and procurement agreement and/or an \nInterconnection Agreement governing the design, construction, and interconnection of the \nTransmission Owner’s facilities to the Distribution Utility’s facilities, including the Network \nUpgrades, required to support service of the Large Load Facility; \nWHEREAS, the Parties enter into this Agreement to establish the Eligible Customer’s \nwholesale revenue-support and security obligations associated with the Large Load Facility and \nthe Large Load-Driven Upgrades, without establishing or prescribing the retail rates, charges, or \nrecovery arrangements between Eligible Customer and Large Load Customer; \nWHEREAS, the Commission has recognized that the framework under which CAISO \nprovides transmission service is unique and that certain responsibilities fall to the Participating \nTransmission Owners, Cal. Indep. Sys. Operator Corp., 195 FERC ¶ 61,214, at P 37 (2026), and \nthis Agreement is the form of agreement established under Sections 10.9 and 10A.6 of the TO \nTariff to secure Eligible Customer’s minimum contribution toward Transmission Owner’s \ntransmission revenue requirement; \nWHEREAS, CAISO is not a party to this Agreement; this Agreement does not create \nany obligation of CAISO, including any obligation to provide settlement, metering, billing, \nresettlement, or allocation data, which arises, if at all, under the CAISO Requirements; and LS \nPower Grid shall recover the costs of the Covered Upgrades through its Formula Rate and shall \nflow TRBAA Credits, including any adjustment resulting from the resolution of a dispute under \nthis Agreement, through to transmission customers through its TRBAA; \nNOW, THEREFORE, in consideration of the mutual promises and covenants set forth \nherein, and for other good and valuable consideration, the receipt and sufficiency of which are \nhereby acknowledged, the Parties intending to be legally bound, agree as follows:  \n1. Recitals. The statements set forth in the recitals above are hereby incorporated herein into \nthe terms and conditions of this Agreement as if fully set forth herein."},{"page":56,"startToken":23186,"endToken":23592,"text":"3 \n \n2. Definitions \nCapitalized terms not defined herein have the meanings given in the CAISO Tariff, the LS \nPower Grid TO Tariff Formula Rate Implementation Protocols in Appendix IV of the TO \nTariff (“Protocols”), or the relevant Interconnection Agreement. \n2.1. \n“Affected System” means an electric transmission system, other than LS Power \nGrid’s transmission system, that an applicable study determines may be materially \naffected by the interconnection or service of the Large Load Facility, including the \ntransmission system of another Participating TO or a transmission system outside the \nCAISO Controlled Grid. \n2.2. \n“Affected System Arrangement” means an executed agreement or other binding \narrangement entered into by Eligible Customer with an Affected System Owner that \nestablishes the applicable study, engineering, design, procurement, construction, \nownership, cost responsibility, cancellation-cost, revenue-support, payment, financial \nsecurity or credit support, true-up, and other obligations associated with an Affected \nSystem Upgrade. \n2.3. \n“Affected System Owner” means the owner or operator responsible for an Affected \nSystem. \n2.4. \n“Affected System Upgrade” means an addition, modification, or upgrade to an \nAffected System that an applicable study determines is necessary to accommodate or \nmitigate an impact caused, in whole or in part, by the interconnection or service of the \nLarge Load Facility. \n2.5. \n“Annual MTRC” means the annual Minimum Transmission Revenue Contribution \nfor a Covered Upgrade, calculated solely under the MTRC Calculation Template in \nSchedule 5. Before the Final MTRC Determination Date for a Covered Upgrade, the \nAnnual MTRC is the Estimated Annual MTRC. On and after that date, it is the Final \nAnnual MTRC fixed under Section 6.3. Each Annual MTRC is levelized over a twenty \n(20)-year MTRC Term beginning on the applicable Upgrade In-Service Date or \nRegional Project In-Service Date, as applicable. The Annual MTRC is not an input to, \nor calculation made under, LS Power Grid’s annual Formula Rate update. \n2.6. \n“Annual Termination Fee Credit” means the annual amount of a Termination Fee \nBalance included in the TRBAA under Section 3.3.4. \n2.7. \n“Applicable Allocation Percentage” has the meaning set forth in Section 6.3.3. \n2.8. \n“Applicable Laws and Regulations” means all duly promulgated applicable federal, \nstate, and local laws, regulations, rules, ordinances, codes, decrees, judgments, \ndirectives, judicial or administrative orders, permits, and other duly authorized actions \nof any Governmental Authority. \n2.9. \n“Applied Security Proceeds” means proceeds of Operational Security that \nTransmission Owner has applied under Section 7.6 to an identified Supplemental"},{"page":57,"startToken":23592,"endToken":24020,"text":"4 \n \nMTRC, prior-period true-up adjustment, Termination Fee, or other payment obligation \narising under Article 6 or Section 3.3.4. Proceeds of Construction Security applied to \nPre-In-Service Termination Costs or other construction-related obligations are not \nApplied Security Proceeds and shall be treated as provided in Sections 3.3.2 and 3.3.3. \n2.10. “ARR” means annual revenue requirement. \n2.11. “Break-Even” has the meaning set forth in Section 6.7. \n2.12. “Business Day” means a Business Day as defined in Appendix A to the CAISO Tariff, \nas amended from time to time. \n2.13. “CAISO-Assigned Regional Project” means a regional transmission project \napproved or designated through a CAISO Tariff process for which CAISO, under the \nCAISO Tariff or a Commission-accepted methodology, formally assigns a specific \npercentage or amount of project costs or revenue requirement to the Large Load \nFacility. The project and assignment must be identified in Schedule 4. A project’s \nregional designation, general system benefit, or inclusion in a CAISO transmission \nplan, without a specific assignment to the Large Load Facility, does not by itself make \nthe project a CAISO-Assigned Regional Project. \n2.14. “CAISO Requirements” means the CAISO Tariff, the Transmission Control \nAgreement, any other agreement to which CAISO is a party that is on file with or \naccepted by the Commission, and any Commission order, regulation, or Commission-\naccepted methodology applicable to CAISO, each as amended from time to time, \ntogether with any CAISO business practice manual or procedure to the extent it \nimplements any of the foregoing. \n2.15. “Calendar Day” means every day, including Saturdays, Sundays, federal holidays, \nand other holidays. \n2.16. “Construction Security” has the meaning set forth in Section 7.1.  \n2.17. “Covered Upgrade” means each Large Load-Driven Upgrade and each LS Power \nGrid-owned CAISO-Assigned Regional Project share that is included in Schedule 1 or \nSchedule 4, as applicable, and for which an Annual MTRC is established under this \nAgreement. \n2.18. “Credit Review Event” means a payment default, credit rating downgrade of the \nEligible Customer or an issuing bank that has not yet triggered a Material Adverse \nCredit Event, a notice of nonrenewal of a Letter of Credit, or another event that, in LS \nPower Grid’s reasonable judgment, warrants updated credit information. A Credit \nReview Event does not, by itself, require delivery of additional Security absent a \nresulting shortfall. \n2.19. “Cumulative Revenue Ledger” means the customer-, Large Load Facility-, project-, \nand Covered Upgrade-specific record maintained by LS Power Grid under Section 6.7. \nThe Cumulative Revenue Ledger shall identify the applicable Total Required Revenue"},{"page":58,"startToken":24020,"endToken":24430,"text":"5 \n \nCommitment, Annual MTRC, Qualifying Transmission Revenues, Supplemental \nMTRC Receipts, Applied Security Proceeds, effective prospective reassignments, \nother permitted adjustments, and the resulting Remaining Cumulative Revenue \nResponsibility and Required Operational Security. \n2.20. “Cumulative Revenue Responsibility” or “Remaining Cumulative Revenue \nResponsibility” means the Total Required Revenue Commitment less amounts that \nhave satisfied that commitment under Section 6.7. \n2.21. “Dispute Determination” has the meaning set forth in Section 11.5. \n2.22. “Distribution Utility” means the public utility, municipal utility, cooperative, or other \nentity that owns, operates, or is responsible for the distribution facilities to which the \nLarge Load Facility is interconnected or proposed to be interconnected, including its \nsuccessors and permitted assigns. \n2.23. “Effective Date” has the meaning set forth in Section 3.1. \n2.24. “Estimated Annual MTRC” means the annual MTRC for a Covered Upgrade \ncalculated from the then-current estimated capital cost using the MTRC Calculation \nTemplate in Schedule 5. LS Power Grid may update the Estimated Annual MTRC as \ncosts change during construction, including when LS Power Grid requires additional \nConstruction Security. \n2.25. “Event of Default” has the meaning set forth in Section 7.11. \n2.26. “Final Annual MTRC” means the fixed Annual MTRC for a Covered Upgrade \nestablished on the Final MTRC Determination Date using final incurred capital cost \nand the Project-Specific Levelized Fixed Charge Rate calculated under the MTRC \nCalculation Template in Schedule 5, including the agreed five percent (5%) annual \nlevelized-depreciation schedule over the twenty (20)-year MTRC Term. The Final \nAnnual MTRC is not recalculated through LS Power Grid’s Formula Rate or Protocols \nand may be recalculated only as provided in Section 6.3.1. \n2.27. “Final MTRC Determination Date” means the date on which LS Power Grid \nestablishes the Final Annual MTRC for a Covered Upgrade, which shall occur within \none (1) year after the applicable Covered Upgrade enters service, when the actual \ncapital cost of that Covered Upgrade is known and all costs associated with its \nestimated capital cost have been accounted for. \n2.28. “Force Majeure” means any cause beyond the reasonable control of the Party \nclaiming, and without the fault or negligence of such Party, which materially prevents \nor impairs the performance of such Party’s obligations hereunder, including but not \nlimited to landslides, storms, ice storms, flood, drought, tornado, hurricane, lightning, \nearthquake, fire, explosion, failure or imminent threat of failure of facilities, supply \nchain issues, civil disturbance, strike, or other labor disturbance, sabotage, vandalism,"},{"page":59,"startToken":24430,"endToken":24883,"text":"6 \n \nriot, terrorism, blockade, insurrection, war, national emergency, or restraint by any \nGovernmental Authority. \n2.29. “Forecast TRBAA Credit” has the meaning set forth in Section 6.8. \n2.30. “Formula Rate” means LS Power Grid’s transmission formula rate template and \nassociated provisions in the TO Tariff, as accepted by the Commission and amended \nfrom time to time. \n2.31. “Governmental Authority” means any federal, state, local, or other governmental, \nregulatory, or administrative agency, court, commission, department, board, \nlegislature, rulemaking body, tribunal, or other governmental authority having \njurisdiction over a Party, the Large Load Facility, any Large Load-Driven Upgrade, or \nthe services or obligations addressed by this Agreement. \n2.32. “Initial Allocation Percentage” has the meaning set forth in Section 6.3.2. \n2.33. “Large Load-Driven Upgrades” means the transmission facilities owned or to be \nconstructed by LS Power Grid and identified in Schedule 1 that the applicable study \ndetermines are driven in whole or in part by the Large Load Facility, alone or together \nwith one or more other large loads. Large Load-Driven Upgrades do not include \nAffected System Upgrades or any facilities whose costs are directly assigned to and \npaid by Eligible Customer under an Interconnection Agreement and are not included \nin LS Power Grid’s rate base. Where a Large Load-Driven Upgrade is an addition to \nor modification of a facility jointly owned by LS Power Grid and another entity, the \nLarge Load-Driven Upgrade includes only LS Power Grid’s ownership share \nidentified in Schedule 1. \n2.34. “Large Load Facility” means the new or incremental load facility owned, operated, \nor proposed to be developed by Large Load Customer and identified in Schedule 1. \n2.35. “Large Load Service Commencement Date” means the date on which the Large \nLoad Facility first takes electric service through the CAISO Controlled Grid or \notherwise begins receiving service under the applicable CAISO Tariff arrangement, as \nspecified in Schedule 1. If the Large Load Facility is not reflected in a CAISO billing \ndeterminant used to assess TAC, Schedule 2 shall identify the applicable wholesale \ntransmission-access, wheeling, or other CAISO Tariff billing arrangement. \n2.36. “Letter of Credit” means an irrevocable, transferable standby letter of credit issued \nfor the benefit of LS Power Grid, meeting the requirements of Schedule 3. \n2.37. “Material Adverse Credit Event” means any of the following: (a) a bankruptcy, \ninsolvency, receivership, or similar event described in Section 7.6(e); (b) a reduction \nin the long-term senior unsecured debt rating of the Eligible Customer or an issuing \nbank below the standards set out in Section 4 of Schedule 3; (c) loss, cancellation, \nmaterial impairment, or expiration of Qualifying Retail Security Support without \ntimely replacement; (d) an incorrect, expired, withdrawn, unavailable, or materially"},{"page":60,"startToken":24883,"endToken":25320,"text":"7 \n \nmisleading Retail Security Certification, as described in Section 7.7 of this Agreement; \nor (e) another event that, in LS Power Grid’s reasonable judgment, materially impairs \nEligible Customer's ability to perform its payment or Security obligations under this \nAgreement. \n2.38. “MTRC Term” means, with respect to each Covered Upgrade, the period beginning \non and including the applicable Upgrade In-Service Date or Regional Project In-\nService Date, as applicable, and ending on the day immediately preceding the \ntwentieth (20th) anniversary of that in-service date (the “MTRC Term End Date”). The \nfirst and final Rate Years of the MTRC Term shall be prorated for partial-year service. \n2.39. “MTRC Term End Date” has the meaning set forth in the definition of “MTRC \nTerm.” \n2.40. “Net Revenue Requirement” means LS Power Grid’s Net Annual Transmission \nRevenue Requirement calculated under its Formula Rate for the applicable Rate Year. \n2.41. “Notice of Dispute” has the meaning set forth in Section 11.1. \n2.42. “Operational Security” has the meaning set forth in Sections 7.2 and 7.5. \n2.43. “Outside Date” means the date identified as the Outside Date in Schedule 1, as such \ndate may be extended by written agreement of the Parties. \n2.44. “Pre-In-Service Termination Costs” has the meaning set forth in Section 3.3.2. \n2.45. “Qualifying Retail Security Support” means retail-customer security for which \nEligible Customer has delivered a currently effective Retail Security Certification \nunder Schedule 3. \n2.46. “Qualifying Transmission Revenues” or “QTR” has the meaning set forth in Section \n6.2.  \n2.47. “Reconciliation Statement” has the meaning set forth in Section 6.6. \n2.48. “Regional Project Allocated ARR” means, for the share of a CAISO-Assigned \nRegional Project that is owned by LS Power Grid, included in LS Power Grid’s \nFormula Rate, and formally allocated to the Large Load Facility under the applicable \nCAISO Tariff provision or Commission-accepted methodology, the Annual MTRC for \nthat project share calculated under Section 6.3.5 and the MTRC Calculation Template \nin Schedule 5, which shall be the Estimated Annual MTRC before the Final MTRC \nDetermination Date and the Final Annual MTRC on and after that date. The Regional \nProject Allocated ARR is calculated using LS Power Grid’s allocated share of the \nproject’s estimated or final capital cost, as applicable, by applying the Project-Specific \nLevelized Fixed Charge Rate calculated under Schedule 5. For purposes of calculating \npresent-worth federal and state income-tax depreciation benefits, Schedule 5 applies a \nlevelized-depreciation rate of five percent (5%) of that allocated capital-cost share in \neach year of the applicable twenty (20)-year MTRC Term. The resulting Regional"},{"page":61,"startToken":25320,"endToken":25688,"text":"8 \n \nProject Allocated ARR shall be recorded in Schedule 4. If CAISO states the \nassignment as an annual revenue-requirement share rather than a capital-cost amount, \nthe equivalent capital-cost input shall be determined only under the allocation method \nestablished by the CAISO Tariff or a Commission-accepted methodology. \n2.49. “Regional Project In-Service Date” means, for a CAISO-Assigned Regional Project \nowned by LS Power Grid, the date the project, or a separately identifiable and \nseparately allocated portion of it, is energized, placed in service, and recorded as \nelectric plant in service on LS Power Grid’s books. Schedule 4 shall identify the \nexpected Regional Project In-Service Date for each project or separately identifiable \nportion. Inclusion of Construction Work in Progress in rate base before that date does \nnot constitute a Regional Project In-Service Date. \n2.50. “Required Operational Security” means the amount of Operational Security required \nunder Section 7.3 and Schedule 3, equal to the nominal Remaining Cumulative \nRevenue Responsibility except to the extent satisfied by Qualifying Retail Security \nSupport. \n2.51. “Required Security Amount” means the aggregate Security then required under this \nAgreement. \n2.52. “Retail Security Certification” means a certification substantially in the form of \nExhibit A contained in Schedule 3 of this Agreement, signed by an authorized officer \nof Eligible Customer, confirming that the Large Load Customer has posted retail \nsecurity with Eligible Customer that is available, through enforceable draw or \napplication rights or a binding undertaking, to satisfy the corresponding wholesale \nobligations under this Agreement. \n2.53. “Security” means Construction Security or Operational Security, as the context \nrequires.  \n2.54. “Security Notice” means LS Power Grid’s written notice of a required increase, \nrestoration, replacement, or other adjustment to Security, including reasonable \nsupporting detail then available. \n2.55. “Successor Eligible Customer” means an Eligible Customer that assumes \nresponsibility under Section 6.10. \n2.56. “Supplemental MTRC” has the meaning set forth in Section 6.4. \n2.57. “Supplemental MTRC Receipts” means payments of Supplemental MTRC received \nby Transmission Owner from or on behalf of Eligible Customer, excluding Applied \nSecurity Proceeds. \n2.58. “TAC” means the Transmission Access Charge, as defined in Appendix A to the \nCAISO Tariff, including the applicable Access Charge components identified in \nSchedule 2."},{"page":62,"startToken":25688,"endToken":26144,"text":"9 \n \n2.59. “Termination Cost Reconciliation” has the meaning set forth in Section 3.3.2. \n2.60. “Termination Fee” has the meaning set forth in Section 3.3.4. \n2.61. “Termination Fee Account” has the meaning set forth in Section 3.3.4.  \n2.62. “Termination Fee Balance” has the meaning set forth in Section 3.3.4. \n2.63. “Total Required Revenue Commitment” has the meaning set forth in Section 6.7. \n2.64. “Transmission Revenue Balancing Account Adjustment” or “TRBAA” means the \nTransmission Revenue Balancing Account Adjustment maintained by LS Power Grid \nunder Section 5.3 of the TO Tariff, as amended from time to time, and “Transmission \nRevenue Balancing Account” or “TRBA” means the associated balancing account \nmaintained under that Section. \n2.65. “TRBAA Credit” means a Forecast TRBAA Credit or an amount recorded in the \nTRBA under Section 6.8 for Supplemental MTRC Receipts, Applied Security \nProceeds other than Applied Security Proceeds applied to a Termination Fee, Annual \nTermination Fee Credits, or a duplicate-recovery credit under Section 3.3.3(d) or \nSection 6.3.5, in each case as flowed through to transmission customers through the \nTRBAA. A TRBAA Credit is not an input to the MTRC Calculation Template or the \nFormula Rate. \n2.66. “Upgrade In-Service Date” means, with respect to each Large Load-Driven Upgrade, \nthe date on which that Large Load-Driven Upgrade is energized, placed in service, and \nincluded as Electric Plant in Service in LS Power Grid’s rate base. Schedule 1 shall \nidentify the expected Upgrade In-Service Date for each Large Load-Driven Upgrade. \nInclusion of Construction Work in Progress in rate base before an upgrade is placed in \nservice does not constitute its Upgrade In-Service Date. \n3. Effective Date, Term and Termination \n3.1. \nEffective Date. This Agreement shall become effective upon execution by the Parties, \nsubject to acceptance by the Federal Energy Regulatory Commission (“FERC” or \n“Commission”) (if applicable), or, if filed unexecuted, upon the date specified by \nFERC (the “Effective Date”). \n3.2. \nTerm. This Agreement shall remain in effect from the Effective Date until LS Power \nGrid issues a final Reconciliation Statement determining that the Total Required \nRevenue Commitment for every Covered Upgrade has been satisfied, transferred to a \nsuccessor, prospectively reassigned, or otherwise discharged. The MTRC Term for \neach Covered Upgrade begins on its applicable Upgrade In-Service Date or Regional \nProject In-Service Date and ends on its applicable MTRC Term End Date. Earlier \nBreak-Even remains available if the Total Required Revenue Commitment is satisfied \nbefore the applicable MTRC Term End Date. If LS Power Grid holds a Termination \nFee Balance when the Total Required Revenue Commitment is otherwise discharged, \nthis Agreement shall remain in effect for purposes of the Termination Fee Account"},{"page":63,"startToken":26144,"endToken":26607,"text":"10 \n \nprovisions in Section 3.3.4 until the Termination Fee Balance has been fully credited \nor released. \n3.3. \nTermination. This Agreement may be terminated as follows:  \n3.3.1. \nTermination Before the First Applicable In-Service Date. Before any Large \nLoad-Driven Upgrade reaches its Upgrade In-Service Date and before any LS \nPower Grid-owned CAISO-Assigned Regional Project reaches its Regional \nProject In-Service Date, this Agreement may be terminated upon thirty (30) \nCalendar Days’ written notice if: (a) the Large Load Service Commencement \nDate has not occurred by the Outside Date; (b) Eligible Customer or Large Load \nCustomer cancels or abandons the Large Load Facility or associated request for \nservice; (c) the applicable interconnection, access to the CAISO Controlled Grid, \nor other arrangement necessary for the Large Load Facility is terminated; (d) an \nEvent of Default has occurred and is continuing, or LS Power Grid exercises a \ntermination right arising from default under this Agreement or an applicable \ninterconnection or transmission service agreement; or (e) Eligible Customer fails \nto timely execute, maintain, or provide the documentation, financial security, or \ncredit support required under Sections 4.2, 6.3.6, or 7.1, and such failure \ncontinues for ten (10) Business Days after written notice from LS Power Grid or \ncannot reasonably be cured by the date on which LS Power Grid must commence \nor continue physical construction or incur a material noncancelable procurement \nor construction commitment. Any such termination shall be subject to Applicable \nLaws and Regulations and any required Commission authorization or acceptance \nand shall not release or limit the obligations described in Sections 3.3.2 and \n3.3.3.  \nIf any Large Load-Driven Upgrade has reached its Upgrade In-Service Date or \nany LS Power Grid-owned CAISO-Assigned Regional Project has reached its \nRegional Project In-Service Date identified in Schedule 4, cancellation, \nabandonment, termination, or failure of the Large Load Facility to commence or \ncontinue service shall not terminate this Agreement. Section 3.3.4 and Articles 6 \nand 7 shall apply to each Large Load-Driven Upgrade and LS Power Grid-owned \nCAISO-Assigned Regional Project for which the applicable in-service date has \noccurred. Section 6.3.6 shall govern any assigned share of a project owned by \nanother entity. \n3.3.2. \nPre-In-Service Termination Costs and Construction Security. If the Large \nLoad Facility, its associated request for service, or any associated Large Load-\nDriven Upgrade is cancelled, abandoned, or otherwise terminated before an \napplicable Large Load-Driven Upgrade reaches its Upgrade In-Service Date, \nEligible Customer shall be responsible for all actual and reasonable costs \nprudently incurred or irrevocably committed by LS Power Grid with respect to \nthat Large Load-Driven Upgrade that have not otherwise been recovered by LS \nPower Grid (“Pre-In-Service Termination Costs”). Pre-In-Service Termination \nCosts include costs incurred before or after the applicable cancellation,"},{"page":64,"startToken":26607,"endToken":27011,"text":"11 \n \nabandonment, or termination to wind down, secure, remove, or otherwise address \nthe unfinished Large Load-Driven Upgrade. \nPre-In-Service Termination Costs include, as applicable: \n(a) engineering, design, study, permitting, environmental, siting, land and land-\nright, procurement, construction, testing, project management, legal, \nregulatory, and administrative costs; \n(b) vendor and contractor cancellation charges, termination charges, change-\norder costs, restocking charges, demobilization costs, contract closeout costs, \nand third-party claims; \n(c) the costs of securing, preserving, mothballing, relocating, redeploying, \ndismantling, removing, transporting, storing, selling, or disposing of \nequipment, materials, and partially completed facilities; \n(d) site restoration, environmental remediation, and the restoration or \nmodification of LS Power Grid’s existing facilities made necessary by the \ncancellation or abandonment; \n(e) Allowance for Funds Used During Construction (“AFUDC”) properly \naccrued in accordance with the Commission’s Uniform System of Accounts \nthrough the date on which the applicable construction activities cease or the \napplicable project is determined to have been abandoned, excluding AFUDC \nassociated with amounts of Construction Work in Progress included in rate \nbase or otherwise recovered through rates; and \n(f) any other costs reasonably incurred by LS Power Grid as a direct result of \nthe cancellation, abandonment, suspension, or termination. \nLS Power Grid may draw upon and apply Construction Security to Pre-In-\nService Termination Costs as such costs are incurred or the associated \nobligations become fixed and payable. LS Power Grid may retain Construction \nSecurity until all Pre-In-Service Termination Costs are reasonably determinable \nand LS Power Grid has served on Eligible Customer a final statement reconciling \nPre-In-Service Termination Costs, Construction Security applied, and the \nrecoveries described in this Section, together with supporting information (the \n“Termination Cost Reconciliation”). Construction Security does not limit \nEligible Customer’s underlying liability. Eligible Customer shall pay any \ndeficiency within ten (10) Business Days after receipt of the Termination Cost \nReconciliation. The Termination Cost Reconciliation shall become final in the \nsame manner and within the same period as a Reconciliation Statement under \nSection 6.6, and LS Power Grid shall release any excess Construction Security \nafter the Termination Cost Reconciliation becomes final, including through \nresolution of any dispute under Article 11. Construction Security applied under \nthis Section does not constitute Applied Security Proceeds and does not produce \na TRBAA Credit except to the extent provided in Section 3.3.3(d). Nothing in \nthis Agreement limits LS Power Grid’s right to seek recovery of unpaid Pre-In-\nService Termination Costs through its Formula Rate or otherwise as the \nCommission may authorize."},{"page":65,"startToken":27011,"endToken":27458,"text":"12 \n \nLS Power Grid shall use commercially reasonable efforts to mitigate Pre-In-\nService Termination Costs, provided that LS Power Grid shall not be required to \ntake any action inconsistent with prudent utility practice, safety requirements, \nApplicable Laws and Regulations, existing contractual obligations, or the \nreliable operation of its transmission facilities. The Termination Cost \nReconciliation shall reflect, when realized, applicable vendor refunds, insurance \nrecoveries, net salvage proceeds, reuse or redeployment credits, and other \nrecoveries attributable to the cancelled or abandoned scope, but shall not credit \namounts representing LS Power Grid’s lawfully earned return or carrying costs \nexcept to the extent necessary to prevent duplicate recovery. \nThis Section applies separately to each Large Load-Driven Upgrade. If one or \nmore Large Load-Driven Upgrades have reached their Upgrade In-Service Dates \nwhen the Large Load Facility or associated request for service is cancelled, this \nSection shall apply only to the Large Load-Driven Upgrades and portions of the \nproject that have not reached their Upgrade In-Service Dates. The treatment of \neach Large Load-Driven Upgrade that has reached its Upgrade In-Service Date \nshall be governed by Section 3.3.4 and Articles 6 and 7. \n3.3.3. \nRate Base and Formula Rate Treatment Before an Upgrade In-Service \nDate. To the extent costs associated with a cancelled or abandoned Large Load-\nDriven Upgrade that has not reached its Upgrade In-Service Date have been \nincluded in Construction Work in Progress or any other component of LS Power \nGrid’s rate base, LS Power Grid shall, consistent with the Commission’s \nUniform System of Accounts, its Formula Rate and Protocols, and other \nApplicable Laws and Regulations: \n(a) remove, reclassify, or otherwise exclude such costs from rate base to the \nextent required by applicable Commission accounting and ratemaking \nrequirements; \n(b) reflect that treatment in the next practicable Annual Update and \ncorresponding true-up; \n(c) cease accruing AFUDC to the extent and at the time required by the \nCommission’s accounting requirements; and \n(d) make any adjustment or credit necessary to prevent LS Power Grid from \nrecovering the same cost both through Construction Security or another \npayment by Eligible Customer and through its Formula Rate; provided that \nany such credit to transmission customers shall be recorded in the TRBA and \nflowed through to transmission customers through the TRBAA as provided \nin Section 6.8, and not through a revenue credit or other input to the Formula \nRate. \nAny depreciation, amortization, or other amount recovered through LS Power \nGrid’s Formula Rate that represents recovery of the same underlying capital or \nexpense included in Pre-In-Service Termination Costs shall be reflected, without \nduplication, in the Termination Cost Reconciliation under Section 3.3.2. \nApplication of Construction Security shall not require LS Power Grid to refund"},{"page":66,"startToken":27458,"endToken":27859,"text":"13 \n \nor surrender any return, carrying cost, tax allowance, or other amount lawfully \nrecovered for a period during which LS Power Grid’s investment was properly \nincluded in rate base, except to the extent necessary to prevent duplicate \nrecovery. \nThis Section 3.3.3 applies only to a Large Load-Driven Upgrade, or portion \nthereof, that has not reached its Upgrade In-Service Date. \n3.3.4. \nEffect of Cancellation After an Upgrade or Regional Project In-Service \nDate. After any Large Load-Driven Upgrade reaches its Upgrade In-Service \nDate or any LS Power Grid-owned CAISO-Assigned Regional Project reaches \nits Regional Project In-Service Date specified in Schedule 4, Eligible Customer \nshall promptly notify LS Power Grid if Eligible Customer or Large Load \nCustomer anticipates or becomes aware of the cancellation, abandonment, \ndownsizing, curtailment, permanent cessation, or material reduction of service at \nthe Large Load Facility. \nCancellation, abandonment, suspension, downsizing, termination, or failure of \nthe Large Load Facility to commence or continue service shall not, by itself: \n(a) terminate this Agreement; \n(b) require the removal from rate base of a Large Load-Driven Upgrade or a LS \nPower Grid-owned CAISO-Assigned Regional Project that has reached its \nin-service date; \n(c) reduce or cap any Annual MTRC, Regional Project Allocated ARR, Total \nRequired Revenue Commitment, or remaining Cumulative Revenue \nResponsibility; or \n(d) terminate, reduce, or excuse Eligible Customer’s obligation to pay the \nSupplemental MTRC and prior-period true-up adjustments under Section 6.6, \nmaintain and replenish Operational Security, or satisfy the remaining \nCumulative Revenue Responsibility. \nUpon any effective termination of this Agreement, or upon the permanent \ncessation of service by the Large Load Facility following an applicable Upgrade \nIn-Service Date or Regional Project In-Service Date, Eligible Customer shall pay \nLS Power Grid a one-time lump-sum termination fee equal to the Remaining \nCumulative Revenue Responsibility, less any Supplemental MTRC that has been \nbilled and remains unpaid as of the effective termination or cessation date (the \n“Termination Fee”). LS Power Grid shall calculate the Termination Fee \nseparately for each Covered Upgrade that has reached its applicable in-service \ndate from the most recently served Cumulative Revenue Ledger, updated \nthrough the effective termination or cessation date for then-known Qualifying \nTransmission Revenues, Supplemental MTRC Receipts, Applied Security \nProceeds, billed and unpaid Supplemental MTRC, and any effective prospective \nreassignment. Billed and unpaid Supplemental MTRC excluded from the \nTermination Fee remains separately payable and secured; its later payment, \nsatisfaction through Applied Security Proceeds, or direct recovery shall reduce"},{"page":67,"startToken":27859,"endToken":28352,"text":"14 \n \nthe Cumulative Revenue Responsibility. The Termination Fee is due thirty (30) \nCalendar Days after LS Power Grid’s invoice. It is an accelerated contractual \ntermination charge, not a penalty or consideration for future transmission service. \nIts receipt in full discharges only the remaining Cumulative Revenue \nResponsibility included in the fee. The Termination Fee is not a Supplemental \nMTRC Receipt, Applied Security Proceeds, prepayment for future transmission \nservice, customer advance for construction, contribution in aid of construction, \nor reduction to rate base. LS Power Grid shall administer the Termination Fee \nonly as provided in Section 3.3.4 and Article 6. \nEach Large Load-Driven Upgrade that has reached its Upgrade In-Service Date \nand each LS Power Grid-owned CAISO-Assigned Regional Project for which an \nAnnual MTRC has been established shall remain subject to the applicable \nFormula Rate and Protocols for so long as it is properly includable in rate base \nunder applicable Commission requirements. The associated payment, Security, \nreconciliation, and TRBAA Credit obligations shall continue in accordance with \nArticles 6 and 7, subject to any prospective reassignment or adjustment \nauthorized under the CAISO Tariff or a Commission-accepted methodology, or \ntransfer to a Successor Eligible Customer under Section 6.10. \nLS Power Grid shall hold each Termination Fee, and any proceeds of \nOperational Security applied to its payment, in a separately identified, interest \nbearing Termination Fee Account for the applicable Covered Upgrade. The \namounts in that account, together with actual earnings and less amounts credited \nor released, constitute the “Termination Fee Balance.” For each Covered \nUpgrade, the Annual Termination Fee Credit for each Rate Year remaining in the \nMTRC Term shall equal the applicable Annual MTRC, prorated for any partial \nRate Year, but shall not exceed the then-available Termination Fee Balance. In \nthe final Rate Year of the MTRC Term, the Annual Termination Fee Credit shall \ninclude the entire remaining Termination Fee Balance, including actual earnings, \nso that the Termination Fee Account is reduced to zero, subject to any amount \nrequired to be released under this Section 3.3.4. LS Power Grid shall include \neach Annual Termination Fee Credit in the TRBAA only for the Rate Year for \nwhich it is scheduled. The Termination Fee Balance shall be separately \naccounted for as a deferred liability pending its scheduled annual TRBAA \ntreatment, shall not be included in rate base, and shall not itself be a TRBAA \nCredit or Formula Rate input. If a prospective reassignment becomes effective \nafter receipt of a Termination Fee, LS Power Grid shall release the portion of the \nTermination Fee Balance attributable to the reassigned responsibility, together \nwith actual earnings, and prospectively adjust the remaining Annual Termination \nFee Credits. \nIf the Commission subsequently requires LS Power Grid to retire, remove, \nreclassify, or exclude all or a portion of an in-service Large Load-Driven \nUpgrade or LS Power Grid-owned CAISO-Assigned Regional Project from rate \nbase, LS Power Grid shall make corresponding prospective adjustments to the \napplicable Annual MTRC, Regional Project Allocated ARR, Total Required"},{"page":68,"startToken":28352,"endToken":28792,"text":"15 \n \nRevenue Commitment, Cumulative Revenue Responsibility, Supplemental \nMTRC, and Operational Security. Such adjustments shall prevent Eligible \nCustomer from remaining responsible under this Agreement for costs that are no \nlonger included in LS Power Grid’s transmission revenue requirement, without \nrequiring a refund or reopening of amounts properly determined for a prior Rate \nYear. \nIf, at the time of cancellation or abandonment, one or more Large Load-Driven \nUpgrades have reached their Upgrade In-Service Dates or a LS Power Grid-\nowned CAISO-Assigned Regional Project has reached its project in-service date, \nand one or more other upgrades or project shares have not, Sections 3.3.2 and \n3.3.3 shall apply to Large Load-Driven Upgrades and project scope that have not \nreached their applicable in-service dates; this Section 3.3.4 and Articles 6 and 7 \nshall apply to the upgrades and LS Power Grid-owned project shares that have \nreached their applicable in-service dates; and Section 6.3.6 shall continue to \ngovern any assigned share of a project owned by another entity. \n3.3.5. \nMutual Termination. The Parties may terminate this Agreement by mutual \nwritten consent only after addressing all incurred construction costs, the \ncontinuing Cumulative Revenue Responsibility, Supplemental MTRC amounts, \nprior-period true-up adjustments, and Security. No termination is effective to \nextinguish such obligations unless expressly accepted or approved by FERC. \n3.4. \nRegulatory Effect of Termination. No termination shall become effective until the \nParties comply with all Applicable Laws and Regulations, including any required \nnotice to or acceptance by FERC. A regulatory rejection, cancellation, downsizing, \ncurtailment, cessation, Force Majeure event, or termination shall not excuse incurred \nconstruction costs or the obligations arising on or after an applicable Upgrade In-\nService Date or Regional Project In-Service Date unless FERC expressly determines \notherwise. \n3.5. \nEffect of Termination. Termination does not release Eligible Customer from \nobligations arising under Articles 4, 6, or 7, including future annual Supplemental \nMTRC payments, prior-period true-up adjustments, and Security maintenance and \nreplenishment, until the Cumulative Revenue Responsibility is finally satisfied or \ntransferred in accordance with this Agreement. Upon LS Power Grid’s receipt of the \nTermination Fee in full, no further Supplemental MTRC shall accrue for any period \nafter the effective termination or cessation date, subject to final true-ups and \nreconciliation for periods before that date. Security does not limit the underlying \nliability. The Large Load Customer’s information, notice, authorization, and \ncooperation obligations stated in its Limited Acknowledgment also survive.  \n4. Transmission Project \n4.1. \nDesign, Procurement, and Construction. Subject to Eligible Customer’s execution \nof this Agreement and the relevant Interconnection Agreement, delivery of \nConstruction Security under Section 7.1, and satisfaction of Section 4.2, LS Power"},{"page":69,"startToken":28792,"endToken":29185,"text":"16 \n \nGrid shall design, procure, construct, install, and own the Large Load-Driven \nUpgrades described in the relevant Interconnection Agreement and Schedule 1, using \nreasonable efforts to meet the applicable construction schedule and expected Upgrade \nIn-Service Dates.  \nEligible Customer shall maintain Construction Security under Section 7.1 sufficient to \nsecure LS Power Grid’s incurred and committed construction costs and the Pre-In-\nService Termination Costs described in Section 3.3.2. Construction Security shall \napply separately to each Large Load-Driven Upgrade until that upgrade reaches its \nUpgrade In-Service Date and the conditions for release or conversion under Section \n7.2 have been satisfied. \nIf different Large Load-Driven Upgrades reach their Upgrade In-Service Dates on \ndifferent dates, Construction Security shall continue to apply to each Large Load-\nDriven Upgrade and portion of the project that has not reached its Upgrade In-Service \nDate, notwithstanding the release or conversion of Construction Security attributable \nto an upgrade that has entered service. \nUpon cancellation, abandonment, or termination, before an applicable Large Load-\nDriven Upgrade reaches its Upgrade In-Service Date, LS Power Grid may draw, \nretain, and apply Construction Security in accordance with Sections 3.3.2 and 7.1 and \nthe relevant Interconnection Agreement. LS Power Grid shall not be required to take \naction inconsistent with its safety practices, design criteria, construction procedures, \nApplicable Laws and Regulations, or the reliable operation of its transmission \nfacilities. \n4.2. \nAffected Systems \n4.2.1. Identification and Coordination. Eligible Customer shall cooperate with LS \nPower Grid, CAISO, each affected Participating TO, and each other Affected \nSystem Owner in identifying and studying potential impacts of the interconnection \nor service of the Large Load Facility on any Affected System. \n4.2.2. Required Affected System Arrangements. For each Affected System Upgrade \nidentified through an applicable study, Eligible Customer shall timely enter into and \nmaintain an Affected System Arrangement with the applicable Affected System \nOwner. Each Affected System Arrangement shall address, as applicable: \n(a) study, engineering, design, procurement, construction, testing, and \nenergization responsibilities; \n(b) responsibility for the costs of the Affected System Upgrade; \n(c) responsibility for cancellation, abandonment, demobilization, equipment \nremoval, disposition, remediation, restoration, AFUDC, and other costs \nresulting from cancellation or failure of the Large Load Facility to proceed; \n(d) construction-period and post-in-service payment obligations and financial \nsecurity or credit support sufficient to protect the Affected System Owner \nand its other customers against cost shifting;"},{"page":70,"startToken":29185,"endToken":29611,"text":"17 \n \n(e) applicable invoicing, reconciliation, true-up, refund, and release procedures; \nand \n(f) any Commission filing, acceptance, or other regulatory authorization \nrequired for the Affected System Arrangement. \n4.2.3. Evidence Before LS Power Grid Construction. At least thirty (30) Calendar \nDays before LS Power Grid’s scheduled commencement of physical construction, \nand in all events before any notice to proceed for physical construction may occur or \nLS Power Grid incurs a material noncancelable procurement or construction \ncommitment, Eligible Customer shall provide LS Power Grid: \n(a) a complete copy of each executed Affected System Arrangement; \n(b) evidence that all financial security or credit support required to be effective \nbefore construction under each Affected System Arrangement has been provided; \n(c) evidence of any required Commission filing, acceptance, or other regulatory \nauthorization; and \n(d) a certification that each Affected System Arrangement remains in full force and \neffect and that Eligible Customer is not in default thereunder. \nLS Power Grid may permit specifically identified preliminary engineering, \nprocurement, or other limited activities to proceed before satisfaction of this Section \nby written notice. Such permission shall not waive any requirement of this Section \nor obligate LS Power Grid to commence or continue physical construction. \n4.2.4. Continuing Obligation. Eligible Customer shall promptly provide LS Power \nGrid a copy of any material amendment, replacement, termination notice, default \nnotice, demand upon financial security or credit support, or other material notice \nconcerning an Affected System Arrangement. Eligible Customer shall maintain each \nrequired Affected System Arrangement and all financial security or credit support \nrequired thereunder until the obligations secured by that arrangement have been \nfinally satisfied, transferred, or released. \n4.2.5. Later-Identified Affected Systems. If an Affected System or Affected System \nUpgrade is identified after LS Power Grid has commenced work, Eligible Customer \nshall promptly enter into the required Affected System Arrangement and provide the \ndocumentation required by this Section. Subject to the applicable tariffs and \nagreements, LS Power Grid may suspend further work, procurement, energization, \nor service to the extent reasonably necessary to avoid additional exposure until the \nrequirement is satisfied. \n4.2.6. Failure to Satisfy Requirements. Eligible Customer’s failure to timely execute, \nmaintain, or provide evidence of an Affected System Arrangement or required \nfinancial security or credit support constitutes a material default under this \nAgreement. Subject to Applicable Laws and Regulations and the applicable tariffs \nand agreements, LS Power Grid may: (a) decline to commence or continue \nconstruction or material procurement commitments; (b) suspend work, energization, \nor service; (c) exercise the termination right in Section 3.3.1; and (d) recover all"},{"page":71,"startToken":29611,"endToken":30060,"text":"18 \n \nresulting Pre-In-Service Termination Costs and other amounts payable under this \nAgreement. \n4.2.7. Confidentiality. Documents provided under this Section shall be subject to the \nconfidentiality protections in Section 6.12. Eligible Customer may redact \ncommercially sensitive provisions unrelated to the requirements of this Section, but \nmay not redact information reasonably necessary for LS Power Grid to verify the \nscope, effectiveness, cost responsibility, financial security or credit support, \ntermination protection, or continuing enforceability of the Affected System \nArrangement. \n4.2.8. Separate Administration. Costs, revenues, payments, and financial security or \ncredit support arising under an Affected System Arrangement shall be administered \nunder that arrangement and the applicable Affected System Owner’s tariff. Such \namounts shall not be included in any Annual MTRC, Total Required Revenue \nCommitment, Supplemental MTRC, Cumulative Revenue Responsibility, or \nTRBAA Credit, except to the extent expressly authorized by the Commission and \nnecessary to prevent duplicate recovery. \n5. Regulatory Approval(s) \n5.1. \nFERC Filing. This Agreement is the form of agreement required under Sections 10.9 \nand 10A.6 of the TO Tariff as a condition of LS Power Grid’s design, procurement, \nand construction of Large Load-Driven Upgrades. Consistent with 18 C.F.R. § 35.1(g), \na conforming, executed Agreement entered into under the Commission-accepted pro \nforma with populated Schedules generally shall not require an individual filing under \nSection 205 of the Federal Power Act. LS Power Grid shall file an unexecuted \nAgreement or an Agreement containing a material deviation, and any other agreement \nrequired to be filed by Commission order or rule. If FERC does not accept a required \nfiling in its entirety, the Parties shall use reasonable efforts to amend and refile it; \nregulatory rejection does not excuse incurred construction costs or payment, Security, \nand true-up obligations for facilities placed in service, except to the extent FERC \nexpressly determines otherwise.  \n6. Cost Recovery  \n6.1. \nCost Recovery and Minimum Contribution. LS Power Grid shall include the Large \nLoad-Driven Upgrades in its Formula Rate to the extent the project costs are properly \nincludable under the Formula Rate, the Protocols, and applicable law. This Agreement \ndoes not remove any Covered Upgrade from rate base or require a capital-cost \nreimbursement. The fixed twenty (20)-year Annual MTRC for each Covered Upgrade \nis instead calculated under the MTRC Calculation Template in Schedule 5, initially \nusing estimated cost and then using final incurred cost on the applicable Final MTRC \nDetermination Date. LS Power Grid shall recover its formula-rate revenue requirement \nthrough TAC and shall flow TRBAA Credits through to transmission customers \nthrough the TRBAA as provided in Section 6.8. Amounts received under this \nAgreement are not inputs to the Formula Rate, and this Agreement does not require"},{"page":72,"startToken":30060,"endToken":30522,"text":"19 \n \nany modification of the Formula Rate. Eligible Customer shall pay a Supplemental \nMTRC only to the extent forecast or actual Qualifying Transmission Revenues are less \nthan the applicable Annual MTRC. The Annual MTRC is a revenue floor, not an \nadditive charge, and does not alter CAISO cost allocation or LS Power Grid plant \naccounting. \nEligible Customer acknowledges that LS Power Grid will incur costs and undertake \nplanning, engineering, procurement, and construction in reliance on the Large Load \nFacility’s development and operation. Eligible Customer therefore accepts the \nwholesale payment and Security obligations in this Agreement. Any retail recovery \nfrom the Large Load Customer remains governed exclusively by applicable state law \nand Eligible Customer’s retail arrangements. \nAffected System Upgrades and the associated costs, revenues, payments, and financial \nsecurity or credit support are governed by Section 4.2 and the applicable Affected \nSystem Arrangement. Unless expressly authorized by the Commission, no Affected \nSystem Upgrade or associated revenue requirement shall be included in LS Power \nGrid’s Annual MTRC, Total Required Revenue Commitment, Supplemental MTRC, \nCumulative Revenue Responsibility, or TRBAA Credit. \n6.2. \nQualifying Transmission Revenues. For each Rate Year or partial Rate Year, \n“Qualifying Transmission Revenues” means wholesale transmission revenues paid by \nor on behalf of Eligible Customer under the CAISO Tariff or another Commission-\naccepted arrangement that are attributable to service to the Large Load Facility and \nreduce transmission revenues otherwise collected from CAISO customers or directly \ncredit LS Power Grid’s Net Revenue Requirement. Qualifying Transmission Revenues \ninclude: (a) the portion of TAC revenue attributable to the Large Load Facility and \nallocable to LS Power Grid under the reproducible methodology in Schedule 2; and (b) \nWheeling Access Charges and other wholesale transmission-access, wheeling, or \ntransmission-service charges paid to CAISO, a Participating TO, or a non-PTO \ntransmission or load-serving entity for deliveries serving the Large Load Facility, but \nonly to the extent they reduce transmission revenues otherwise collected through TAC \nor directly credit LS Power Grid’s Net Revenue Requirement and are not otherwise \nreflected as a credit in calculating the Annual MTRC, the Supplemental MTRC, or a \nTRBAA Credit. Qualifying Transmission Revenues do not include Supplemental \nMTRC Receipts, Applied Security Proceeds, retail charges, or amounts that do not \nreduce transmission revenues otherwise collected from CAISO customers or directly \ncredit LS Power Grid’s Net Revenue Requirement. \n6.3. \nAnnual MTRC and Allocation.  \n6.3.1. Upgrade-Specific MTRC Calculation. LS Power Grid shall calculate a separate \nAnnual MTRC for each Covered Upgrade solely under the MTRC Calculation \nTemplate in Schedule 5. Before the Final MTRC Determination Date, LS Power \nGrid shall calculate and update the Estimated Annual MTRC from the then-current \nestimated capital cost. Within one (1) year after the applicable Covered Upgrade \nenters service, when the actual capital cost of that Covered Upgrade is known and"},{"page":73,"startToken":30522,"endToken":31069,"text":"20 \n \nall costs associated with its estimated capital cost have been accounted for, LS \nPower Grid shall establish the Final Annual MTRC using final incurred capital cost \nand the Project-Specific Levelized Fixed Charge Rate calculated under Schedule 5. \nSchedule 5 shall calculate the Project-Specific Levelized Fixed Charge Rate by: (i) \ndetermining the present-worth revenue requirement using the applicable capital \nstructure, cost of debt, return on equity, federal and state income-tax rates, income-\ntax conversion factor, and levelized-depreciation schedule; (ii) applying a \ndepreciation rate of five percent (5%) of the applicable capital cost input in each \nyear of the twenty (20)-year MTRC Term to calculate present-worth federal and \nstate income-tax depreciation benefits; (iii) annualizing the resulting present-worth \nrevenue requirement over the MTRC Term using the applicable after-tax discount \nrate and annualization factor; and (iv) adding the fixed expense allocator specified \nin Schedule 5. The Final Annual MTRC shall equal the applicable final incurred \ncapital cost multiplied by the resulting Project-Specific Levelized Fixed Charge \nRate. No component reflected in the Project-Specific Levelized Fixed Charge Rate \nor the fixed expense allocator shall be added again as a separate component of the \nAnnual MTRC. The Final Annual MTRC and the Schedule 5 inputs used to \ncalculate it are fixed as of the Final MTRC Determination Date and shall not be \nrecalculated for later changes in actual cost, Formula Rate inputs, or other cost-of-\nservice components, except to correct an error or fraud, to implement an effective \nprospective reassignment, to implement a final FERC order applicable to the \ncalculation, or to reflect, prospectively, a change in (i) LS Power Grid’s return on \nequity component of its Formula Rate, resulting from a final FERC order accepting \nor approving such change, or (ii) applicable federal or state income tax rates or \nincome tax law enacted after the Final MTRC Determination Date; provided that, \nthe five percent (5%) annual levelized-depreciation schedule in Schedule 5 shall \nremain fixed for the MTRC Term unless a final FERC order requires otherwise. If \nLS Power Grid adjusts the Final Annual MTRC after the Final MTRC \nDetermination Date pursuant to the foregoing provision, LS Power Grid shall update \nthe MTRC Calculation Template and serve it upon Eligible Customer in accordance \nwith the notice provisions contained in this Agreement. Upon such service to \nEligible Customer, the updated MTRC Calculation Template shall replace the \nexisting MTRC Calculation Template in its entirety and become effective on the \ndate of such service. The foregoing effectiveness of an updated MTRC Calculation \nTemplate does not preclude Eligible Customer from disputing any change to the \nMTRC Calculation Template pursuant to Article 11 of this Agreement. Any \nresulting adjustment to the Total Required Revenue Commitment shall apply only to \nthe Rate Years remaining in the MTRC Term as provided in Section 6.7. \nEach Annual MTRC shall apply for its separate twenty (20)-year MTRC Term, with \nthe initial and final partial Rate Years prorated based on the number of monthly \nBilling Periods in the applicable Rate Year during which the Covered Upgrade is in \nservice. Schedule 1 shall identify the initial Estimated Annual MTRC and initial \nprojected Total Required Revenue Commitment for each Large Load-Driven \nUpgrade, and Schedule 5 shall record the Final MTRC Determination Date, Final \nAnnual MTRC, Total Required Revenue Commitment, and the completed"},{"page":74,"startToken":31069,"endToken":31511,"text":"21 \n \ncalculation for each Covered Upgrade. Schedule 4 shall provide the corresponding \nproject-specific information for a LS Power Grid-owned CAISO-Assigned Regional \nProject, if applicable. \n6.3.2. Initial Allocation. Schedule 1 shall identify, separately for each Large Load-\nDriven Upgrade, the percentage of the upgrade initially allocated to the Large Load \nCustomer under this Agreement (the “Initial Allocation Percentage”). The Initial \nAllocation Percentage shall be determined using the applicable final study and \nallocation methodology and shall account for: \n(a) Large Load Customers studied individually, jointly, or in a cluster; \n(b) the extent to which two or more Large Load Customers caused the need for \nor share a Large Load-Driven Upgrade; \n(c) differing requested service levels, development phases, and facility \nconfigurations; and \n(d) any portion of the facility determined at the outset to serve other \ntransmission system needs or customers. \nThe aggregate percentages allocated to all Large Load Customers for a Large Load-\nDriven Upgrade shall not exceed one hundred percent (100%). Any portion not \nallocated to a Large Load Customer shall be excluded from the Annual MTRC \nallocable to any Large Load Customer and remain subject to the otherwise-\napplicable CAISO cost allocation and rate recovery requirements. \n6.3.3. Applicable Allocation Percentage. For each Large Load-Driven Upgrade, the \n“Applicable Allocation Percentage” shall equal the Initial Allocation Percentage \nidentified in Schedule 1, as adjusted prospectively by any reassignment effective \nunder Section 6.9 or as otherwise required by a final Commission order or \napplicable tariff provision. A cancellation, abandonment, downsizing, curtailment, \npermanent cessation, or material reduction of service by the Large Load Customer \nshall not, by itself, reduce the Applicable Allocation Percentage. \n6.3.4. Annual MTRC Allocation. The Annual MTRC applicable to Eligible Customer \nshall equal the Annual MTRC for the Covered Upgrade as a whole multiplied by the \nApplicable Allocation Percentage; provided that, where Schedule 5 applies that \npercentage to capital cost or otherwise calculates the Annual MTRC for an already \nallocated project share, the resulting Annual MTRC is already allocated and the \npercentage shall not be applied again. LS Power Grid shall maintain the calculation \nseparately by Large Load Customer, Large Load Facility, and Covered Upgrade. \nThe aggregate Annual MTRCs allocated to all large load customers shall not exceed \nthe Annual MTRC for the Covered Upgrade as a whole. \n6.3.5. CAISO-Assigned Regional Projects Owned by LS Power Grid. For each \nCAISO-Assigned Regional Project owned by LS Power Grid and included in its \nFormula Rate, LS Power Grid shall calculate separately the Regional Project \nAllocated ARR attributable to the specific share formally assigned to the Large \nLoad Facility. The Regional Project Allocated ARR shall be calculated solely under"},{"page":75,"startToken":31511,"endToken":32003,"text":"22 \n \nthe MTRC Calculation Template in Schedule 5, using LS Power Grid’s allocated \nshare of the project’s estimated capital cost before the Final MTRC Determination \nDate and its allocated share of final incurred capital cost on that date, and shall be \nestablished, updated, and fixed in the same manner and on the same schedule that \nSection 6.3.1 provides for other Covered Upgrades. The resulting Annual MTRC \nshall be included in the Supplemental MTRC calculation and the Total Required \nRevenue Commitment beginning on the Regional Project In-Service Date. The \nallocated share shall be determined under the applicable allocation under the CAISO \nTariff or Commission-accepted methodology and the project-specific information in \nSchedule 4. No portion assigned to other customers, other facilities, or broader \nregional needs shall be included. Before the Regional Project In-Service Date, any \ncosts of a cancelled or abandoned project shall be treated under the applicable \nCAISO Tariff, Commission order, and any abandoned-plant incentive specifically \nauthorized for that project. This Agreement does not create a separate pre-service \npayment or Construction Security obligation solely because CAISO has assigned a \nregional project share to Large Load Facility. Any pre-service payment, \ncontribution, or security required by the CAISO Tariff, an applicable \nInterconnection Agreement, or another Commission-accepted arrangement remains \ndue under that authority and shall be identified in Schedule 4. Any abandoned-plant \nrecovery, customer payment, or security proceeds shall receive the accounting and \nrate treatment required by the Commission, and any credit necessary to prevent \nduplicate recovery of the same costs shall be recorded in the TRBA and flowed \nthrough to transmission customers through the TRBAA as provided in Section 6.8. \nAny prospective adjustment or reassignment of the share assigned to the Large Load \nFacility shall occur only as provided by the CAISO Tariff or a Commission-\naccepted methodology. Rate base inclusion, depreciation, and other accounting for \nthe underlying project share remain subject to the Formula Rate, the Protocols, and \nthe Commission's Uniform System of Accounts; this Section 6.3.5 governs only the \ncalculation of the Annual MTRC applicable to the Large Load Facility under this \nAgreement. \n6.3.6. CAISO-Assigned Regional Projects Owned by Another Entity. If CAISO \nformally assigns a specific share of a CAISO-Assigned Regional Project to the \nLarge Load Facility and that project is not owned by LS Power Grid or is not \nincluded in LS Power Grid’s Formula Rate, Eligible Customer shall satisfy the \nassigned share under the CAISO Tariff or enter into and maintain the required \narrangement with the project owner or other responsible entity. The arrangement \nshall address, as applicable, payment of assigned costs and revenue responsibility, \nconstruction and cancellation obligations, security or credit support, invoicing, \nreconciliation, true-up, refund, release, and any required regulatory filing or \nacceptance. Eligible Customer shall provide LS Power Grid a copy of the executed \narrangement or other evidence reasonably sufficient to demonstrate compliance, \nincluding the amount and basis of the assigned share, the billing party, payment \nterms, and required security."},{"page":76,"startToken":32003,"endToken":32481,"text":"23 \n \nEligible Customer shall provide the required arrangement or evidence by the \ndeadline specified in Schedule 4, which shall be no later than the earliest applicable \ndeadline under the CAISO Tariff or project-owner arrangement and, where the \nassignment is known before construction, before the project owner commences \nconstruction. If CAISO makes the assignment after construction has commenced or \nafter the project enters service, Eligible Customer shall comply within the period \nspecified by CAISO or the project owner and provide evidence to LS Power Grid \npromptly. Failure to comply is an Event of Default if not cured as provided in \nSection 7.11(c). \nAmounts owed to another project owner are not included in any Annual MTRC, \nRegional Project Allocated ARR, Total Required Revenue Commitment, \nSupplemental MTRC, Cumulative Revenue Responsibility, or TRBAA Credit \nunless the amount is included in LS Power Grid’s Formula Rate and Schedule 4 \nexpressly identifies it as LS Power Grid’s assigned share. The applicable tariff or \nproject-owner arrangement shall identify and apply any credits required to prevent \nduplicate recovery of the same assigned share through both a direct charge and a \ntransmission rate. Payments to another owner satisfy only the corresponding \nobligation under that tariff or arrangement and do not reduce the Cumulative \nRevenue Responsibility owed to LS Power Grid unless they satisfy the same \nunderlying obligation included in LS Power Grid’s Formula Rate. The Eligible \nCustomer’s obligations under this Section survive termination of this Agreement \nand cessation of service until the assigned share has been paid or assumed by a \nsuccessor and the obligation has been discharged, transferred, or released under the \napplicable CAISO Tariff or project-owner arrangement by the entity entitled to \nenforce it. \n6.4. \nSupplemental MTRC. Beginning on the in-service date of each Covered Upgrade, \nEligible Customer shall pay the positive shortfall, if any, between the applicable \nAnnual MTRC, prorated for a partial Rate Year based on the number of monthly \nBilling Periods in that Rate Year during which the Covered Upgrade is in service, and \nQualifying Transmission Revenues attributable to the Large Load Facility during the \ncorresponding Rate Year or partial Rate Year. Until the Final MTRC Determination \nDate, billing shall use the Estimated Annual MTRC. Upon initial finalization, the Final \nAnnual MTRC shall apply back to the applicable in-service date, and estimated \ncharges shall be reconciled in the next Reconciliation Statement under Section 6.6. \nThereafter, the calculation shall use the Final Annual MTRC, subject to adjustments \npermitted by Section 6.3.1. Qualifying Transmission Revenues attributable to a \nspecific Covered Upgrade shall be applied to that upgrade. Qualifying Transmission \nRevenues not attributable to a specific Covered Upgrade shall be allocated among the \nCovered Upgrades then in their MTRC Terms pro rata based on their respective \nprorated Annual MTRCs for the applicable period. \nThe calculation may be expressed as: \nSupplemental MTRC = max (applicable Annual MTRC − Qualifying Transmission \nRevenues, $0)."},{"page":77,"startToken":32481,"endToken":32986,"text":"24 \n \nThe Annual MTRC is not an annual true-up of project cost or Formula Rate inputs. \nAnnual reconciliation is limited to Qualifying Transmission Revenues, Supplemental \nMTRC invoices and receipts, Applied Security Proceeds, TRBAA Credits, partial-year \nproration, effective prospective reassignment, and correction of error, fraud, a final \nFERC order applicable to the calculation, and any prospective recalculation of the \nFinal Annual MTRC permitted by Section 6.3.1. \n6.5. \nInvoice. With each Annual Projection, LS Power Grid shall forecast Qualifying \nTransmission Revenues and calculate the projected Supplemental MTRC using the \napplicable fixed or estimated Annual MTRC from Schedule 5, increased or reduced by \nany prior-period true-up adjustment under Section 6.6. LS Power Grid shall invoice \nthe forecasted Supplemental MTRC for the applicable Rate Year or partial Rate Year \nin equal monthly installments for each Billing Period in that Rate Year during which \nthe Covered Upgrade is in service; for a full Rate Year, the projected Supplemental \nMTRC shall be invoiced in twelve (12) equal monthly installments. Each installment \nis payable within thirty (30) Calendar Days after receipt of the invoice. If a Covered \nUpgrade reaches its applicable in-service date during a Rate Year for which the \nAnnual Projection did not include a projected Supplemental MTRC for that Covered \nUpgrade, LS Power Grid shall promptly forecast Qualifying Transmission Revenues \nand invoice the prorated Supplemental MTRC for the remaining Billing Periods of that \nRate Year. LS Power Grid shall include the projected Supplemental MTRC, including \nany prior-period true-up adjustment, as a Forecast TRBAA Credit in the next annual \nTRBAA under Section 6.8. Only cash actually received by LS Power Grid, or Applied \nSecurity Proceeds actually applied by LS Power Grid, constitutes an actual receipt for \npurposes of Sections 6.6 through 6.8. Concurrently with each Annual Projection, LS \nPower Grid shall provide Eligible Customer upgrade-specific workpapers showing the \napplicable Annual MTRC, forecast Qualifying Transmission Revenues, projected \nSupplemental MTRC, any prior-period true-up adjustment, Forecast TRBAA Credit, \nTotal Required Revenue Commitment, and Required Operational Security. \n6.6. \nAnnual Reconciliation Statement. In connection with each Annual Update, LS \nPower Grid shall determine the actual Supplemental MTRC obligation using actual \nQualifying Transmission Revenues and the applicable fixed or estimated Annual \nMTRC from Schedule 5. LS Power Grid shall identify, by Eligible Customer and \nCovered Upgrade, the opening unpaid billed Supplemental MTRC balance, \nSupplemental MTRC invoiced during the Rate Year, cash received by LS Power Grid, \nApplied Security Proceeds applied to identified obligations, direct recoveries, closing \nunpaid billed balance, and each Annual Termination Fee Credit. Concurrently with \neach Annual Update, LS Power Grid shall serve on Eligible Customer a Reconciliation \nStatement containing those determinations, the updated Cumulative Revenue Ledger, \nRequired Operational Security recalculated under Section 7.4, a reconciliation of the \nForecast TRBAA Credit to actual amounts recorded in the TRBA, and supporting \nworkpapers. An unpaid Supplemental MTRC remains due from Eligible Customer \nand, when later received or satisfied through Applied Security Proceeds, is recorded in \nthe TRBA only in the Rate Year of receipt or application. The Reconciliation"},{"page":78,"startToken":32986,"endToken":33496,"text":"25 \n \nStatement shall not reopen the Final Annual MTRC or Total Required Revenue \nCommitment except as expressly allowed by Section 6.3.1. \nThe difference between the Supplemental MTRC billed for a Rate Year, excluding any \nprior-period true-up adjustment included in that billing, and the actual Supplemental \nMTRC determined in the Reconciliation Statement for that Rate Year shall constitute a \n“prior-period true-up adjustment,” which shall increase (if under-billed) or reduce (if \nover-billed) the projected Supplemental MTRC invoiced under Section 6.5 following \nthe next Annual Projection. If no further Supplemental MTRC will be invoiced under \nthis Agreement, LS Power Grid shall invoice any under-billed amount, payable within \nthirty (30) Calendar Days after receipt of the invoice, and shall refund any over-billed \namount to Eligible Customer within thirty (30) Calendar Days after service of the \nReconciliation Statement. No interest shall accrue on the Supplemental MTRC or on \nany prior-period true-up adjustment, invoice, refund, or other adjustment of the \nSupplemental MTRC between LS Power Grid and Eligible Customer. Any refund to \nEligible Customer of an amount previously recorded as a TRBAA Credit shall be \nreversed in the TRBA when paid, and any under-billed amount later received shall be \nrecorded in the TRBA when received, in each case as provided in Section 6.8. Any \namount returned by LS Power Grid to transmission customers through the TRBAA \nshall include interest as provided in Section 5.3 of the TO Tariff. \nA Reconciliation Statement shall become final on the earlier of (a) Eligible \nCustomer’s written acceptance of the Reconciliation Statement or (b) ninety (90) \nCalendar Days after service, unless before that date Eligible Customer serves a Notice \nof Dispute under Section 11.1 identifying with reasonable specificity the items \ndisputed. If a Notice of Dispute is timely served, the undisputed portions of the \nReconciliation Statement shall become final on the date that would otherwise apply, \nand the disputed items shall become final upon the applicable Dispute Determination \nunder Section 11.5. A final Reconciliation Statement may be revised only to \nimplement a Dispute Determination, to reflect CAISO resettlements or other corrected \ndata as provided in Schedule 2, or to correct errors or fraud. Finality of a \nReconciliation Statement under this Agreement does not affect the Commission’s \nreview and approval of any TRBAA. \nFor purposes of this Agreement, Supplemental MTRC Receipts exclude Applied \nSecurity Proceeds. Applied Security Proceeds shall be counted only when LS Power \nGrid applies such proceeds to satisfy an identified payment obligation and shall reduce \nthat obligation dollar-for-dollar. The posting, maintenance, replenishment, drawing, or \nholding of Security shall not, by itself, constitute a Supplemental MTRC Receipt, an \nApplied Security Proceed, satisfaction of the Cumulative Revenue Responsibility, or a \nTRBAA Credit. \nNo amount shall be counted both as a Supplemental MTRC Receipt and as an Applied \nSecurity Proceed. If LS Power Grid receives payment of an obligation previously \nsatisfied through Applied Security Proceeds, LS Power Grid shall not count the \nsubsequent payment toward the Cumulative Revenue Responsibility or a TRBAA \nCredit and shall instead return the duplicative amount, release an equivalent amount of"},{"page":79,"startToken":33496,"endToken":33904,"text":"26 \n \nSecurity, or, with supporting notice to Eligible Customer, apply the amount to another \nthen-outstanding obligation under this Agreement. \n6.7. \nCumulative Revenue Responsibility and Break-Even. LS Power Grid shall \nmaintain a Cumulative Revenue Ledger for each Covered Upgrade and shall update it \nat least annually in connection with the Annual Update. LS Power Grid shall include \nan updated Cumulative Revenue Ledger statement, with supporting workpapers, in \neach Reconciliation Statement served on Eligible Customer under Section 6.6. For \neach Covered Upgrade, the Total Required Revenue Commitment equals the Final \nAnnual MTRC multiplied by twenty (20), adjusted only for partial-year proration and \nany prospective recalculation of the Final Annual MTRC permitted by Section 6.3.1, \nwhich shall apply only to the Rate Years remaining in the MTRC Term after the \nrecalculation takes effect. Until the Final MTRC Determination Date, the projected \nTotal Required Revenue Commitment shall equal the Estimated Annual MTRC \nmultiplied by twenty (20). \nRemaining Cumulative Revenue Responsibility equals the applicable Total Required \nRevenue Commitment less: \n(a) cumulative Qualifying Transmission Revenues; \n(b) cumulative Supplemental MTRC Receipts; \n(c) cumulative Applied Security Proceeds; \n(d) effective prospective reassignment credits; and \n(e) cash amounts received and applied toward the Termination Fee, excluding any \nportion satisfied through Applied Security Proceeds already counted under \nclause (c). \nEach dollar shall be entered in the Cumulative Revenue Ledger only once. \nSupplemental MTRC Receipts shall exclude Applied Security Proceeds. Applied \nSecurity Proceeds shall be entered only when applied to an identified Supplemental \nMTRC, prior-period true-up adjustment, Termination Fee, or other payment obligation \nunder Article 6 or Section 3.3.4. Security that is posted, drawn but not applied, held as \na deferred liability, replenished, replaced, or returned shall not reduce the Cumulative \nRevenue Responsibility. Annual Termination Fee Credits and the corresponding \nTermination Fee Balance shall be separately identified in the Reconciliation Statement \nand in the workpapers required under Section 6.8 and shall not again reduce the \nCumulative Revenue Responsibility. \nIf an amount previously credited in the Cumulative Revenue Ledger is subsequently \nrefunded, reversed, disallowed, or otherwise ceases to satisfy the applicable obligation, \nLS Power Grid shall make a corresponding adjustment to the ledger, subject to the \nfinality and no-revival provisions of this Section. \nCancellation, downsizing, curtailment, or departure does not extinguish the remaining \nresponsibility. When a final Reconciliation Statement determines that the \nresponsibility has reached zero (“Break-Even”), LS Power Grid shall terminate the \noperational payment and Security obligations and release any excess Security. Once"},{"page":80,"startToken":33904,"endToken":34454,"text":"27 \n \nfinally satisfied, the responsibility shall not revive because of a later change in ROE, \nexpense, load, forecast, or other Formula Rate input, subject only to final true-ups and \ncorrection of errors or fraud for periods before satisfaction. \n6.8. \nTRBAA Credit and No Double Recovery. Supplemental MTRC Receipts, Applied \nSecurity Proceeds other than Applied Security Proceeds applied to a Termination Fee, \nAnnual Termination Fee Credits, and any duplicate-recovery credit under Section \n3.3.3(d) or Section 6.3.5 shall be credited to transmission customers solely through the \nTRBAA and shall not be recorded as revenue credits in, or otherwise included as \ninputs to, the Formula Rate. In each annual TRBAA, LS Power Grid shall include as \nthe Forecast TRBAA Credit: (a) the projected Supplemental MTRC for the following \nRate Year, increased or reduced by any prior-period true-up adjustment invoiced under \nSection 6.5; and (b) for any Covered Upgrade with a Termination Fee Balance, the \nAnnual Termination Fee Credit scheduled under Section 3.3.4 for the following Rate \nYear, prorated as applicable and limited to the available Termination Fee Balance. LS \nPower Grid shall record in the TRBA only Supplemental MTRC cash receipts, \nApplied Security Proceeds other than Applied Security Proceeds applied to a \nTermination Fee, and Annual Termination Fee Credits actually received, applied, or \nscheduled for the applicable Rate Year, respectively. Applied Security Proceeds \napplied to a Termination Fee shall be deposited into and held in the Termination Fee \nAccount under Section 3.3.4 and shall be credited to transmission customers solely \nthrough the applicable Annual Termination Fee Credits. The difference between the \nForecast TRBAA Credit and those actual amounts shall be reflected in the principal \nbalance of the TRBA and flowed through to transmission customers in a subsequent \nTRBAA. A billed but unpaid Supplemental MTRC is not a TRBAA Credit. A later \nSupplemental MTRC Receipt or Applied Security Proceeds, other than Applied \nSecurity Proceeds applied to a Termination Fee, shall be recorded only in the Rate \nYear in which it is received or applied, respectively. Any amount previously recorded \nas a TRBAA Credit that is later refunded, reversed, or otherwise ceases to satisfy the \napplicable obligation shall be reversed in the TRBA when refunded or reversed. \nInterest on the TRBA balance shall be calculated as provided in Section 5.3 of the TO \nTariff. Qualifying Transmission Revenues shall not be included again as a TRBAA \nCredit because they are already reflected in calculating the Supplemental MTRC. \nEach dollar shall be included in a TRBAA Credit only once. Applied Security \nProceeds shall not also be treated as Supplemental MTRC Receipts, and the posting, \ndrawing, holding, replenishment, replacement, or return of Security shall not \nindependently produce a TRBAA Credit. A Forecast TRBAA Credit applies only to \nthe forecast Rate Year and shall be reconciled through the TRBA to actual \nSupplemental MTRC Receipts, Applied Security Proceeds other than those applied to \na Termination Fee, and Annual Termination Fee Credits, as applicable. \nLS Power Grid shall maintain workpapers reconciling each Forecast TRBAA Credit \nand each amount recorded in the TRBA under this Section 6.8 to the applicable \nAnnual MTRC calculation in Schedule 5, forecast and actual Qualifying Transmission \nRevenues, opening unpaid billed balance, Supplemental MTRC invoiced, prior-period \ntrue-up adjustment, Supplemental MTRC cash receipt, Applied Security Proceed,"},{"page":81,"startToken":34454,"endToken":34883,"text":"28 \n \ndirect recovery, closing unpaid billed balance, Termination Fee Balance, Annual \nTermination Fee Credit, resulting forecast-to-actual TRBA difference, Rate Year, \nLarge Load Customer, and Covered Upgrade. LS Power Grid shall include with each \nTRBAA filing workpapers sufficient to permit transmission customers to verify the \nTRBAA Credits reflected in that TRBAA, which may present customer-specific \ninformation on an aggregated basis or be submitted subject to a request for privileged \ntreatment under 18 C.F.R. § 388.112 or other appropriate confidentiality protections. \n6.9. \nProspective Reassignment of Revenue Responsibility.  \n6.9.1. Eligibility for Reassignment of Revenue Responsibility. Whether or not the \nLarge Load Customer remains in service, a portion of the prospective revenue \nresponsibility associated with a Large Load-Driven Upgrade may be reassigned to a \nsubsequent load customer if an objective transmission study conducted under the \napplicable tariff or study process determines that: \n(a) the subsequent large load customer relies upon identifiable incremental \ncapability created by the Large Load-Driven Upgrade; and \n(b) that reliance avoids or reduces identifiable transmission upgrades that \notherwise would have been required to provide the subsequent large load \ncustomer’s requested service. \nIncidental power flows, generalized system benefits, or use of the transmission \nsystem that does not satisfy both requirements shall not support a reassignment. \nThis Section 6.9 applies only to a load customer other than the Large Load \nCustomer, at a facility other than the Large Load Facility. It does not apply to a \ntransfer of ownership or operation of the Large Load Facility, a change in Eligible \nCustomer, or an assignment of this Agreement, which are governed by Sections \n6.10 and 10.1 and do not alter the Applicable Allocation Percentage or the Large \nLoad-Driven Upgrades attributable to the Large Load Facility. \n6.9.2. Reassignment Calculation. LS Power Grid shall determine the prospective \nreassignment separately for each Large Load-Driven Upgrade satisfying Section \n6.9.1 (each, a “Shared Upgrade”). For each Shared Upgrade: \n(a) the Demonstrated Avoided Upgrade Cost shall equal the reasonable \nestimated cost of the transmission upgrades that would have been required \nfor the subsequent large load customer absent the Shared Upgrade, less the \nreasonable estimated cost of any additional transmission upgrades required \nwhen the capability of the Shared Upgrade is considered; \n(b) the Remaining Allocated Net Plant shall equal the portion of the Shared \nUpgrade’s net plant balance included in rate base immediately before the \nreassignment that remains assigned to the Large Load Customer under this \nAgreement; \n(c) the Capability-Supported Amount shall equal the portion of the Remaining \nAllocated Net Plant reasonably attributable to the incremental capability of"},{"page":82,"startToken":34883,"endToken":35272,"text":"29 \n \nthe Shared Upgrade actually relied upon by the subsequent large load \ncustomer; and \n(d) the Reassigned Investment Amount shall equal the least of: \n(i) the Demonstrated Avoided Upgrade Cost; \n(ii) the Capability-Supported Amount; and \n(iii) the Remaining Allocated Net Plant. \nThe Demonstrated Avoided Upgrade Cost, Capability-Supported Amount, and \nRemaining Allocated Net Plant shall be determined using a consistent cost basis and \nprice year. If Remaining Allocated Net Plant is greater than zero, the Reassignment \nPercentage shall equal the Reassigned Investment Amount divided by the \nRemaining Allocated Net Plant, bounded between zero and one hundred percent \n(100%). If Remaining Allocated Net Plant is zero or negative, no Reassignment \nPercentage shall be calculated under this methodology; any reassignment shall \nrequire an applicable tariff methodology or Commission determination addressing \nthat circumstance. \n6.9.3. Prospective Adjustment of Revenue Responsibility. Beginning on the \nReassignment Effective Date, the applicable Annual MTRC assigned to the Large \nLoad Customer shall be prospectively reduced by the Reassignment Percentage \napplied to the Shared Upgrade. LS Power Grid shall record a separate effective \nprospective reassignment credit in the Cumulative Revenue Ledger equal to the \nReassignment Percentage multiplied by the Remaining Cumulative Revenue \nResponsibility associated with the Shared Upgrade that remains assigned to the \nLarge Load Customer immediately before the Reassignment Effective Date. That \ncredit shall be the sole Cumulative Revenue Ledger adjustment for the reassigned \nresponsibility. It shall not adjust the Total Required Revenue Commitment or result \nin a second reduction to the Remaining Cumulative Revenue Responsibility or \nRequired Operational Security for the same reassigned responsibility. \nLS Power Grid shall recalculate the Supplemental MTRC and Operational Security \nunder this Agreement to reflect the reassignment. The Reassignment Effective Date \nshall be the latest of: \n(a) the date the subsequent large load customer commences the service for \nwhich the Shared Upgrade provides the identified incremental capability; \n(b) the effective date of a cost recovery agreement establishing the subsequent \nlarge load customer’s corresponding revenue responsibility; \n(c) the date on which all Security required from the eligible customer serving \nthe subsequent large load customer becomes effective; and \n(d) the date on which the study and any other approvals required under the \napplicable tariff become final. \nNo reduction in the Large Load Customer’s Operational Security shall occur until \nthe corresponding responsibility and required Security have become effective for the \nsubsequent large load customer."},{"page":83,"startToken":35272,"endToken":35731,"text":"30 \n \n6.9.4. Prospective Treatment and Prevention of Duplicate Reassignment. A \nreassignment under this Section shall: \n(a) operate prospectively only and shall not produce a refund, credit, or \nreopening of amounts properly determined for a prior Rate Year; \n(b) transfer prospective revenue responsibility only and shall not constitute a \nsale or transfer of transmission facilities, a transfer of plant ownership, a \nchange in plant accounting, or a modification of any CAISO cost allocation; \n(c) not exceed the prospective responsibility remaining under this Agreement \nfor the Shared Upgrade; and \n(d) not assign the same transmission capability, avoided upgrade cost, Annual \nMTRC, or Cumulative Revenue Responsibility to more than one large load \ncustomer. \nLS Power Grid shall maintain an upgrade-specific reassignment ledger identifying \nthe capability and responsibility assigned to each large load customer. Once \nresponsibility has been effectively reassigned, that responsibility shall not revert to \nthe Large Load Customer if the subsequent large load customer later terminates, \nreduces, or fails to commence service. The reassigned responsibility shall instead \nremain with the subsequent large load customer and the Eligible Customer \nresponsible for its payment, subject to any further prospective reassignment \npermitted under the applicable agreement and tariff. \nAny prospective reassignment, adjustment, or change in the cost share of a CAISO-\nAssigned Regional Project shall be recognized under this Agreement only to the \nextent authorized or required by the CAISO Tariff or a Commission-accepted \nmethodology. LS Power Grid shall apply an effective change prospectively to the \nRegional Project Allocated ARR, Cumulative Revenue Responsibility, \nSupplemental MTRC, TRBAA Credit, and Operational Security, and shall update \nSchedule 4 and the applicable workpapers. The change shall not assign the same \nproject share to more than one customer or alter costs allocated to other customers \nunder the CAISO Tariff. \n6.10. Change in Eligible Customer. Cost responsibility is assigned to the Large Load \nCustomer and Large Load Facility, as paid by the Eligible Customer then taking \nwholesale transmission service on behalf of the Large Load Customer and Large Load \nFacility. If the Eligible Customer serving a Large Load Customer or Large Load \nFacility changes, the Successor Eligible Customer must execute an assumption \nagreement covering the Cumulative Revenue Responsibility and any outstanding \nobligations under Section 6.3.6, provide required Security, and become responsible on \na date coordinated with CAISO billing before the prior Eligible Customer is released. \nFollowing the complete departure of the Large Load Customer, the last responsible \nEligible Customer remains obligated unless responsibility is transferred under an \napplicable tariff or state-law mechanism, assumed by a successor, or prospectively \nreassigned as permitted under this Agreement and the CAISO Requirements. If \nownership or operation of the Large Load Facility is transferred, Eligible Customer \nshall notify LS Power Grid within thirty (30) Calendar Days and shall cause the"},{"page":84,"startToken":35731,"endToken":36190,"text":"31 \n \ntransferee to execute a Limited Acknowledgment in the form attached to this \nAgreement. The transfer shall not alter the Applicable Allocation Percentage, \nCumulative Revenue Responsibility, or Security obligations under this Agreement. \nA sale, lease, or other transfer of the Large Load Facility, or of the Large Load \nCustomer’s interest in such Large Load Facility, is not a reassignment under Section \n6.9 and does not require a study under Section 6.9.1. Cost responsibility shall continue \nto follow the Large Load Facility, the transferee shall execute a Limited \nAcknowledgment substantially in the form included in this Agreement, and Eligible \nCustomer shall remain responsible for its obligations under this Agreement unless they \nare transferred to a Successor Eligible Customer under this Section 6.10. \n6.11. CAISO Data and Settlement Coordination. Eligible Customer shall provide LS \nPower Grid, or authorize and direct its Scheduling Coordinator, Utility Distribution \nCompany, Metering Coordinator, and other applicable entities to provide LS Power \nGrid, with the metering, settlement, billing, resettlement, allocation, and other data \nreasonably necessary to calculate and verify Qualifying Transmission Revenues and \nadminister this Agreement. Eligible Customer shall execute any authorization or data-\nrelease documentation reasonably necessary for LS Power Grid to obtain such \ninformation. \nTo the extent authorized or required by the CAISO Tariff, CAISO may provide or \nmake available relevant settlement, metering, billing, resettlement, and allocation data \nas provided under the CAISO Requirements. Nothing in this Agreement, however, \nimposes an obligation on CAISO or makes CAISO a party to this Agreement. LS \nPower Grid and Eligible Customer shall cooperate with CAISO and other applicable \nentities to establish and maintain the billing identifiers, metering points, data \nexchanges, and authorizations identified in Schedule 2. \nLS Power Grid shall calculate Qualifying Transmission Revenues, the Annual MTRC, \nand the Supplemental MTRC; maintain the Cumulative Revenue Ledger; and serve on \nEligible Customer the Reconciliation Statement, including the Cumulative Revenue \nLedger statement, required by Sections 6.6 and 6.7. \nIf final data are not available when a calculation is required, LS Power Grid may use \nreasonable estimates based on the best information then available, subject to \nreconciliation under Section 6.6 when final or corrected data become available. \n6.12. Information Rights and Confidentiality. Upon reasonable request, LS Power Grid \nshall provide Eligible Customer the workpapers, data, and other information \nreasonably necessary to verify the identification of Large Load-Driven Upgrades and \nCAISO-Assigned Regional Projects and all calculations of each Annual MTRC, \nRegional Project Allocated ARR, Total Required Revenue Commitment, Qualifying \nTransmission Revenues, Supplemental MTRC, Cumulative Revenue Responsibility, \nTRBAA Credits, reassignment, and Security under this Agreement. Any dispute \nconcerning those matters shall be resolved under Article 11. Large Load Customer and \nany Successor Eligible Customer may participate in a dispute under Article 11 to the"},{"page":85,"startToken":36190,"endToken":36610,"text":"32 \n \nextent the dispute affects its obligations under this Agreement or its Limited \nAcknowledgment. Customer-specific information shall be protected under Section \n16.3 of the TO Tariff, the CAISO Tariff, and any applicable confidentiality agreement. \n7. Security and Payment Obligations \n7.1. \nConstruction Security. Before an applicable Large Load-Driven Upgrade reaches its \nUpgrade In-Service Date, Eligible Customer shall maintain Construction Security \nunder the relevant agreement sufficient to secure: \n(a) LS Power Grid’s incurred and irrevocably committed engineering, design, \nprocurement, permitting, construction, testing, and related costs attributable \nto that upgrade; and \n(b) the Pre-In-Service Termination Costs described in Section 3.3.2, including \nproperly accrued AFUDC and applicable cancellation, demobilization, \nequipment removal, disposition, remediation, and restoration costs \n(“Construction Security”).  \nConstruction Security secures, but does not limit, Eligible Customer’s liability for \nthose amounts. Construction Security provided under the relevant Interconnection \nAgreement or an engineering and procurement agreement for the same costs shall \ncount toward, and shall not be duplicated by, the Construction Security required under \nthis Agreement. Construction Security shall remain in effect for each Large Load-\nDriven Upgrade until that upgrade reaches its Upgrade In-Service Date and the \napplicable release or conversion conditions in Section 7.2 are satisfied. \nA Large Load-Driven Upgrade reaching its Upgrade In-Service Date shall not result in \nthe release of Construction Security attributable to another Large Load-Driven \nUpgrade that has not reached its Upgrade In-Service Date. Eligible Customer shall \nreplenish Construction Security within ten (10) Business Days after notice of a \npermitted draw and supporting information if additional secured obligations remain \nand the remaining Construction Security is less than the amount required under this \nSection. \nFor a CAISO-Assigned Regional Project owned by LS Power Grid, any pre-service \npayment, contribution, or security required from Eligible Customer for its formally \nassigned share shall be provided only as required by the CAISO Tariff, an applicable \nInterconnection Agreement, or another Commission-accepted arrangement, and shall \nbe identified in Schedule 4. This Agreement does not independently require pre-\nservice Construction Security solely because CAISO has assigned a share of a regional \nproject to the Large Load Facility. The treatment of costs for a cancelled or abandoned \nregional project shall be governed by Section 6.3.5 and the applicable Commission \norder, CAISO Tariff, and any project-specific abandoned-plant incentive authorized by \nthe Commission. For a project owned by another entity, construction and operational \nsecurity shall be provided under the CAISO Tariff or the arrangement required by \nSection 6.3.6 and Schedule 4; it shall not be treated as LS Power Grid Operational"},{"page":86,"startToken":36610,"endToken":37034,"text":"33 \n \nSecurity unless included in LS Power Grid’s Formula Rate and expressly identified as \nLS Power Grid’s share. \n7.2. \nDelivery of Operational Security. No later than thirty (30) Calendar Days before the \nearliest expected Upgrade In-Service Date identified in Schedule 1 or Regional Project \nIn-Service Date identified in Schedule 4 for a LS Power Grid-owned CAISO-Assigned \nRegional Project, Eligible Customer shall deliver Operational Security calculated \nunder this Article for the Large Load-Driven Upgrades and LS Power Grid-owned \nCAISO-Assigned Regional Project expected to enter service. Operational Security \nmust be fully effective before any applicable Upgrade In-Service Date or Regional \nProject In-Service Date.  \nIf different Large Load-Driven Upgrades or LS Power Grid-owned CAISO-Assigned \nRegional Projects are expected to reach their applicable in-service dates on different \ndates, LS Power Grid shall recalculate the Required Operational Security before each \nsubsequent in-service date to include the additional Cumulative Revenue \nResponsibility attributable to the upgrade or project share entering service. Eligible \nCustomer shall provide any resulting increase no later than fifteen (15) Business Days \nafter receipt of a Security Notice, or by the applicable in-service date if earlier. \nInclusion of pre-service Construction Work in Progress in rate base shall not constitute \nan Upgrade In-Service Date or independently trigger the Operational Security \nrequirement. Construction Security shall remain applicable to each Large Load-Driven \nUpgrade that has not reached its Upgrade In-Service Date. \nNo Construction Security attributable to a Large Load-Driven Upgrade shall be \nreleased or converted unless:  \n(a) the Required Operational Security attributable to that upgrade is effective; \n(b) that upgrade has reached its Upgrade In-Service Date; and \n(c) LS Power Grid has determined that all Pre-In-Service Termination Costs and \nother construction-related obligations attributable to that upgrade have been \npaid or adequately reserved for. \nAny portion of Construction Security retained for unresolved construction costs shall \nbe released after LS Power Grid determines that those costs have been paid or \nadequately reserved for or, if Section 3.3.2 applies, after the Termination Cost \nReconciliation becomes final. Failure to timely deliver Required Operational Security \nis a default permitting LS Power Grid, to the extent authorized by the applicable tariffs \nand agreements, to suspend energization or service, terminate applicable \ninterconnection arrangements, and draw Construction Security for secured obligations.  \n7.3. \nRequired Operational Security. Required Operational Security shall equal one \nhundred percent (100%) of the nominal Remaining Cumulative Revenue \nResponsibility. LS Power Grid shall reduce that amount only by the portion of \nQualifying Retail Security Support identified in a currently effective Retail Security \nCertification. A Retail Security Certification is accepted in reliance on Eligible"},{"page":87,"startToken":37034,"endToken":37529,"text":"34 \n \nCustomer’s representations and does not require LS Power Grid to review the \nunderlying retail-security documents in the ordinary course. If LS Power Grid has a \nreasonable basis to question the certification, or after a payment default, Credit \nReview Event, or Material Adverse Credit Event, LS Power Grid may request \nsupporting information reasonably necessary to verify continued compliance. Any \nresulting deficiency shall be delivered or restored within fifteen (15) Business Days \nafter receipt of a Security Notice, or by the applicable in-service date if earlier. \n7.4. \nAnnual Resizing and Security Notices. LS Power Grid shall recalculate Required \nOperational Security with each Annual Projection, Final MTRC Determination Date, \nrecalculation of a Final Annual MTRC under Section 6.3.1, Reconciliation Statement, \neffective prospective reassignment, replacement or expiration of Qualifying Retail \nSecurity Support, or Credit Review Event. If LS Power Grid reasonably determines \nthat the Required Security Amount exceeds available Security, it may issue a Security \nNotice identifying the required increase or restoration and reasonable supporting detail \nthen available. Eligible Customer shall provide the required increase or restoration \nwithin fifteen (15) Business Days after receipt of the Security Notice, or by the \napplicable in-service date if earlier. A reduction shall be released only after the \nrelevant calculation and reconciliation are final. \n7.5. \nForm of Operational Security. Except to the extent of currently effective Qualifying \nRetail Security Support, Eligible Customer shall provide direct Operational Security in \nthe form of cash, an irrevocable standby Letter of Credit meeting Schedule 3, or any \ncombination of cash and Letter of Credit. LS Power Grid may accept another form of \nSecurity that it determines, in its sole discretion, is acceptable. \nEach Letter of Credit shall have an initial stated term of at least twelve (12) months \nand shall remain continuously effective until released under this Agreement; provided, \nhowever, that a Letter of Credit may have a stated expiration date before its release \ndate if Eligible Customer timely extends or replaces it so that Security in an amount \nnot less than the Required Security Amount remains continuously available to LS \nPower Grid.  \nIf an issuing bank has the right not to renew a Letter of Credit, the Letter of Credit \nshall require the issuing bank to provide LS Power Grid and Eligible Customer at least \nninety (90) Calendar Days’ prior written notice of nonrenewal. Eligible Customer shall \nprovide a conforming extension or replacement Letter of Credit, or additional cash \ncollateral or other Security accepted by LS Power Grid, no later than sixty (60) \nCalendar Days before the applicable expiration date.   \nIf Eligible Customer fails to provide the required extension, replacement, or other \nSecurity by that deadline, LS Power Grid may, before the Letter of Credit expires, \ndraw all or any portion of the then-available amount under the Letter of Credit and \nretain the proceeds as cash collateral, apply the proceeds to secured obligations, or \nboth. Any proceeds retained but not applied shall continue to constitute Security until \nreleased under this Agreement."},{"page":88,"startToken":37529,"endToken":38056,"text":"35 \n \n7.6. \nDraw and Application. LS Power Grid may draw against all or any portion of a \nLetter of Credit, apply cash collateral, or apply another form of Security accepted by \nLS Power Grid to secured obligations upon: (a) an unpaid Supplemental MTRC, true-\nup, Termination Fee, or other amount due after the applicable payment period; (b) \nEligible Customer’s failure to timely deliver, maintain, replace, restore, or increase \nSecurity; (c) cancellation, termination, withdrawal, abandonment, or permanent \ncessation of the Large Load Facility or a material breach of this Agreement; (d) a \nmaterial inaccuracy in a Retail Security Certification or Security instrument; (e) \nEligible Customer: (i) files a voluntary petition in bankruptcy or seeks reorganization, \narrangement, or similar relief under any bankruptcy, insolvency, or debtor-relief law; \n(ii) becomes subject to an involuntary bankruptcy or insolvency proceeding that is not \ndismissed within sixty (60) Calendar Days; (iii) has a receiver, trustee, liquidator, or \ncustodian appointed for it or a substantial portion of its assets, which appointment is \nnot vacated within sixty (60) Calendar Days; (iv) makes a general assignment for the \nbenefit of creditors; or (v) admits in writing its inability to pay debts as they become \ndue; or (f) Eligible Customer fails to extend, replace, or otherwise maintain Security in \nthe amount and within the time required by Section 7.5, including following a notice \nof nonrenewal, issuer rating reduction, or other event affecting the availability of a \nLetter of Credit. \nA draw shall not automatically require replenishment to the amount maintained \nimmediately before the draw. Following any application of drawn proceeds to an \namount due, LS Power Grid shall recalculate the remaining Cumulative Revenue \nResponsibility and the Operational Security then required under this Article. Eligible \nCustomer shall replenish only the amount, if any, by which the remaining Operational \nSecurity is less than the recalculated Required Security Amount, within fifteen (15) \nBusiness Days after receipt of a Security Notice, or by the applicable in-service date if \nearlier. \nProceeds drawn solely to prevent the expiration or nonrenewal of a Letter of Credit, \nand cash collateral not yet applied to an identified payment obligation, shall remain \nrefundable Security and shall continue to constitute Operational Security until applied \nto an amount then due or released under Section 7.9. Such proceeds and cash collateral \nshall be included in determining the amount of remaining Operational Security and \nshall not create an additional replenishment obligation merely because they are held by \nLS Power Grid. \nThe posting, drawing, holding, replacement, or replenishment of Operational Security \nshall not, by itself, satisfy the secured obligation, reduce Cumulative Revenue \nResponsibility, or produce a TRBAA Credit. Drawn proceeds of Operational Security \nshall become Applied Security Proceeds only when LS Power Grid applies them to an \nidentified Supplemental MTRC, prior-period true-up adjustment, Termination Fee, or \nother secured payment obligation arising under Article 6 or Section 3.3.4. Upon \napplication, the proceeds shall reduce that obligation dollar-for-dollar and shall receive \nthe TRBAA treatment required by Section 6.8; provided, however, that Applied \nSecurity Proceeds applied to a Termination Fee shall be administered under Section \n3.3.4 and credited to transmission customer only through the Annual Termination Fee"},{"page":89,"startToken":38056,"endToken":38521,"text":"36 \n \nCredits provided under Section 6.8. Proceeds of Construction Security applied to Pre-\nIn-Service Termination Costs or other construction-related obligations shall be treated \nas provided in Sections 3.3.2 and 3.3.3. \n7.7. \nSecurity Maintenance. Because Required Operational Security is initially one \nhundred percent (100%) of nominal Remaining Cumulative Revenue Responsibility, \nno separate acceleration concept applies. An incorrect, expired, withdrawn, \nunavailable, or materially misleading Retail Security Certification, or the loss of \nenforceable retail-security rights described in it, is a Material Adverse Credit Event. \nEligible Customer shall provide replacement direct Security for any resulting \nuncovered amount within fifteen (15) Business Days after receipt of a Security Notice, \nor by the applicable in-service date if earlier. \n7.8. \nPost-Termination Administration and Cash Collateral. LS Power Grid shall \ncontinue the annual calculations, invoices, and true-ups required under this Agreement \nfollowing termination of service to, or the departure, permanent cessation, or material \nreduction of service by, the Large Load Customer until the Cumulative Revenue \nResponsibility and all other obligations under this Agreement have been finally \nsatisfied, transferred, reassigned, refunded, or otherwise resolved. The Parties intend \nthat cash collateral and proceeds of Security be treated as a deposit or deferred liability \nrather than as a Contribution in Aid of Construction, customer financing of \ntransmission plant, or a reduction to LS Power Grid’s rate base. To the extent \npermitted by applicable Commission accounting and ratemaking requirements and tax \nlaw, LS Power Grid shall record and administer such amounts as the corresponding \nannual costs and payment obligations arise. The treatment described in this Section is \nsubject to the Commission’s Uniform System of Accounts, the Formula Rate, the \nProtocols, applicable Commission orders, and other Applicable Laws and Regulations. \nIf the Commission requires a different accounting or ratemaking treatment, LS Power \nGrid shall implement the required treatment and make corresponding adjustments \nnecessary to prevent duplicate recovery and preserve, to the extent permitted, the \neconomic allocation established by this Agreement. The Parties shall cooperate in \nseeking any necessary Commission authorization or acceptance.  \nNothing in this Agreement guarantees a particular accounting, ratemaking, or tax \nresult. Cash collateral and unapplied Security proceeds shall remain subject to release \nunder Section 7.9, including release to reflect an effective prospective reassignment \nunder Section 6.9. \n7.9. \nRelease of Security. LS Power Grid shall release excess Operational Security only \nafter the applicable Reconciliation Statement becomes final. LS Power Grid shall \nrelease Security attributable to an effective prospective reassignment and shall release \nall remaining Security within thirty (30) Calendar Days after final satisfaction of the \nCumulative Revenue Responsibility and all other secured obligations. Termination \nalone does not require release. \n7.10. Security Does Not Limit Liability. The Required Security Amount is based on LS \nPower Grid’s then-current estimates and calculations and does not cap, replace, or"},{"page":90,"startToken":38521,"endToken":39035,"text":"37 \n \ndischarge Eligible Customer’s underlying obligations. A shortfall between Security \nand the amount due remains immediately payable to LS Power Grid. \n7.11. Events of Default; Remedies. Each of the following is an “Event of Default” by \nEligible Customer: (a) failure to pay any undisputed amount when due that continues \nfor ten (10) Business Days after written notice from LS Power Grid; (b) failure to \ndeliver, maintain, replace, restore, or increase Security when required under this \nArticle 7 or Schedule 3 that continues after the applicable cure period; (c) any other \nmaterial breach of this Agreement, including under Section 4.2 or 6.3.6, that continues \nfor thirty (30) Calendar Days after written notice from LS Power Grid or, if the breach \ncannot reasonably be cured within that period, for such longer period, not to exceed \nninety (90) Calendar Days, as Eligible Customer diligently pursues a cure; and (d) any \nevent described in Section 7.6(e). Upon an Event of Default, LS Power Grid may, \nsubject to Applicable Laws and Regulations and the applicable tariffs and agreements: \n(i) draw and apply Security under Section 7.6; (ii) exercise the rights described in \nSections 4.2.6 and 7.2; (iii) before the first Upgrade In-Service Date or Regional \nProject In-Service Date, terminate this Agreement under Section 3.3.1; and (iv) pursue \nany other remedy available at law or in equity or before the Commission. No \ntermination after an Upgrade In-Service Date or Regional Project In-Service Date \nreleases the obligations described in Section 3.3.4. \n8. Force Majeure. \n8.1. \nIf a Party is rendered unable, wholly or in part, by Force Majeure to carry out a \nnonmonetary obligation, that obligation shall be suspended only to the extent and for \nthe period performance is prevented. Force Majeure does not suspend or excuse \npayment of incurred construction costs, Pre-In-Service Termination Costs, \nSupplemental MTRC, the Termination Fee, prior-period true-up adjustments, or the \nmaintenance, replacement, replenishment, or increase of Security. If a Force Majeure \nevent continues for more than twenty (20) Calendar Days in a sixty (60)-Calendar Day \nperiod, the Parties shall meet to address performance; any resulting termination \nremains subject to Sections 3.4 and 3.5.  \n9. Indemnification  \n9.1. \nIndemnity. Each Party (the “Indemnifying Party”) shall at all times indemnify, \ndefend, and hold the other Party and its Affiliates and their respective directors, \nofficers, employees, and agents (each, an “Indemnified Person”) harmless from any \nand all damages, losses, claims, including claims and actions relating to injury to or \ndeath of any person or damage to property, demand, suits, recoveries, costs and \nexpenses, court costs, attorney fees, and all other obligations by or to third parties, \narising out of or resulting from the Indemnifying Party’s actions or omissions in \nperforming its obligations under this Agreement, except to the extent caused by the \ngross negligence or willful misconduct of the Indemnified Person. \n9.1.1. \nIndemnified Person. If an Indemnified Person is entitled to indemnification as a \nresult of a claim by a third party, and the Indemnifying Party fails, after notice"},{"page":91,"startToken":39035,"endToken":39549,"text":"38 \n \nand reasonable opportunity to proceed, to assume the defense of such claim, such \nIndemnified Person may at the expense of the Indemnifying Party contest, settle \nor consent to the entry of any judgment with respect to, or pay in full, such \nclaim. \n9.1.2. \nIndemnifying Party. If an Indemnifying Party is obligated to indemnify and \nhold any Indemnified Person harmless, the amount owing to the Indemnified \nPerson shall be the amount of such Indemnified Person’s actual loss, net of any \ninsurance or other recovery. \n9.2. \nIndemnity Procedures. Promptly after receipt by an Indemnified Person of any claim \nor notice of the commencement of any action or administrative or legal proceeding or \ninvestigation as to which the indemnity provided for in Section 9.1 may apply, the \nIndemnified Person shall notify the Indemnifying Party of such fact. Any failure of or \ndelay in such notification shall not affect a Party’s indemnification obligation unless \nsuch failure or delay is materially prejudicial to the Indemnifying Party. \nThe Indemnifying Party shall have the right to assume the defense thereof with \ncounsel designated by such Indemnifying Party and reasonably satisfactory to the \nIndemnified Person. If the defendants in any such action include one or more \nIndemnified Persons and the Indemnifying Party and if the Indemnified Person \nreasonably concludes that there may be legal defenses available to it and/or other \nIndemnified Persons which are different from or additional to those available to the \nIndemnifying Party, the Indemnified Person shall have the right to select separate \ncounsel to assert such legal defenses and to otherwise participate in the defense of \nsuch action on its own behalf. In such instances, the Indemnifying Party shall only be \nrequired to pay the fees and expenses of one additional attorney to represent an \nIndemnified Person or Indemnified Persons having such differing or additional legal \ndefenses. \nThe Indemnified Person shall be entitled, at its expense, to participate in any such \naction, suit or proceeding, the defense of which has been assumed by the Indemnifying \nParty. Notwithstanding the foregoing, the Indemnifying Party (i) shall not be entitled \nto assume and control the defense of any such action, suit or proceedings if and to the \nextent that, in the opinion of the Indemnified Person and its counsel, such action, suit \nor proceeding involves the potential imposition of criminal liability on the Indemnified \nPerson, or there exists a conflict or adversity of interest between the Indemnified \nPerson and the Indemnifying Party, in which event the Indemnifying Party shall pay \nthe reasonable expenses of the Indemnified Person, and (ii) shall not settle or consent \nto the entry of any judgment in any action, suit or proceeding without the consent of \nthe Indemnified Person, which shall not be unreasonably withheld, conditioned or \ndelayed. \n9.3. \nConsequential Damages. Except for amounts expressly payable under Articles 3, 4, \n6, and 7, no Party shall be liable under this Agreement for special, indirect, incidental, \nconsequential, or punitive damages, including lost profit or revenue, loss of use, cost \nof capital, or temporary equipment or services, under any theory of liability. Amounts"},{"page":92,"startToken":39549,"endToken":40001,"text":"39 \n \nrequired to satisfy the Cumulative Revenue Responsibility, Supplemental MTRC, \nconstruction costs, prior-period true-up adjustments, and Security obligations are \ndirect contractual payment obligations and are not excluded damages. \n10. Assignment \n10.1. Except for a change in Eligible Customer governed by Section 6.10, a Party may \nassign this Agreement only with the other Party’s written consent; provided that a \nParty may assign to an Affiliate with equal or greater creditworthiness and legal and \noperational capacity to perform. No assignment or change in retail service provider \nreleases the existing Eligible Customer until the assignee or Successor Eligible \nCustomer executes the required assumption, provides required Security, and the \ntransfer becomes effective under the applicable tariffs. Any prohibited assignment is \nvoid, and Security provided by or on behalf of Large Load Customer does not make \nLarge Load Customer the wholesale obligor.  \n11. Disputes \nAll disputes, claims, or controversies arising out of or relating to this Agreement, including \nany dispute concerning the identification or allocation of Large Load-Driven Upgrades or \nCovered Upgrades; any calculation, update, or recalculation of an Estimated Annual MTRC, \nFinal Annual MTRC, Regional Project Allocated ARR, or the MTRC Calculation Template; \nQualifying Transmission Revenues; Supplemental MTRC; Total Required Revenue \nCommitment; Cumulative Revenue Responsibility; TRBAA Credits; Pre-In-Service \nTermination Costs; the Termination Fee; prospective reassignment; or Security, shall be \nresolved under this Article 11, except that a dispute concerning CAISO’s designation of a \nregional project or assignment of a project cost share shall be resolved under the applicable \nCAISO Tariff procedures. Any payment, refund, credit, or other adjustment resulting from the \nresolution of a dispute under this Article 11 shall be implemented as provided in Section 11.5. \n11.1. Submission and Informal Resolution. In the event of a dispute or claim arising out \nof or relating to this Agreement, the disputing Party shall provide the other Party with \na written notice describing the dispute (“Notice of Dispute”). The dispute shall be \nreferred promptly to designated senior representatives for informal resolution. The \nrepresentatives shall meet or confer within ten (10) Business Days and shall use \nreasonable efforts to resolve the matter within thirty (30) Calendar Days after receipt \nof the Notice of Dispute. This informal process is not a condition to seeking \nemergency relief, filing a FERC complaint, or invoking any ADR processes. \n11.2. Alternative Dispute Resolution. If a dispute is not resolved informally, any Party \nmay request Alternative Dispute Resolution (“ADR”). The Parties shall use the ADR \nprocedures, neutral-selection process, confidentiality protections, and timing \nrequirements specified in the applicable FERC rules. ADR shall be conducted by \npersons knowledgeable in electric utility, transmission, and FERC matters and shall \nnot alter a jurisdictional rate, term, or condition unless accepted or approved by the \nFERC."},{"page":93,"startToken":40001,"endToken":40530,"text":"40 \n \n11.3. FERC Complaints and Other Rights. Any Party may instead file a complaint, \npetition, or other pleading with the FERC under Section 206 or Section 306 of the \nFederal Power Act, or seek other relief available under the Federal Power Act or \nApplicable Laws and Regulations, and LS Power Grid may make any filing under \nSection 205 of the Federal Power Act permitted by Section 12.12. No Party’s \nparticipation in informal negotiations or ADR waives or limits its right to seek FERC \naction. A final ADR determination affecting jurisdictional rates, terms, conditions, \ncharges, or Network Upgrades shall be filed with the FERC if required. \n11.4. Costs and Interim Performance. Unless otherwise determined through ADR, the \nParties shall bear their own costs and share neutral costs as specified by the applicable \nADR procedure. During a dispute, each Party shall continue performing undisputed \npayment and operational obligations, and shall pay undisputed amounts when due.  \n11.5. Implementation of Dispute Determinations; TRBAA. Within thirty (30) Calendar \nDays after a dispute under this Article 11 is finally resolved, whether by written \nagreement of the Parties, a final ADR determination (subject to any required \nCommission filing or acceptance), or a final Commission order (each, a “Dispute \nDetermination”), LS Power Grid shall: (a) update the affected MTRC Calculation \nTemplate, Schedules, Cumulative Revenue Ledger, Reconciliation Statement, and \nRequired Operational Security, as applicable, and serve the updated documents on \nEligible Customer; and (b) invoice or refund, as applicable, any amount owed between \nthe Parties as a result of the Dispute Determination, without interest. To the extent a \nDispute Determination changes a TRBAA Credit or any other amount previously \ncredited to, or recovered from, transmission customers, including any change in \nSupplemental MTRC Receipts or Applied Security Proceeds for a prior Rate Year, LS \nPower Grid shall record the resulting difference in the TRBA under Section 6.8 and \nflow it through to transmission customers through the TRBAA, and any amount so \nreturned by LS Power Grid to transmission customers shall include interest as \nprovided in Section 5.3 of the TO Tariff. If a final Commission order in a proceeding \nconcerning LS Power Grid’s TRBAA requires a change to any TRBAA Credit \nattributable to this Agreement, LS Power Grid shall implement that order in the TRBA \nand shall make any corresponding updates and adjustments between the Parties under \nthis Section 11.5 as if the order were a Dispute Determination. Nothing in this Section \nreopens the Final Annual MTRC or Total Required Revenue Commitment except as \nrequired to implement a Dispute Determination or as permitted by Section 6.3.1. \n12. Miscellaneous. \n12.1. Amendment. Except for updates to the MTRC Calculation Template expressly \nauthorized by Section 6.3.1, updates implementing a Dispute Determination under \nSection 11.5, and administrative updates expressly permitted elsewhere in this \nAgreement, this Agreement may be amended only by a written instrument executed by \nthe Parties. An authorized template update shall not change the substantive \nmethodology or other terms of this Agreement. Any material deviation from the \nCommission-accepted pro forma and any unexecuted amendment shall be filed with \nFERC as required by the applicable tariffs and Commission rules."},{"page":94,"startToken":40530,"endToken":40955,"text":"41 \n \n12.2. Entire Agreement. This Agreement, its Schedules, the relevant Interconnection \nAgreement, and other agreements expressly incorporated herein state the Parties’ \ncomplete understanding concerning the wholesale cost recovery mechanism. Nothing \nin this Agreement establishes the retail rates, charges, or security arrangements \nbetween Eligible Customer and Large Load Customer. \n12.3. Governing Tariffs and Order of Precedence. This Agreement shall be interpreted \nand administered consistently with the Federal Power Act, applicable Commission \norders, the CAISO Tariff, and the TO Tariff. The CAISO Tariff, the TO Tariff, and \nany other tariff or agreement within the CAISO Requirements that is on file with or \naccepted by the Commission control over this Agreement and its Schedules to the \nextent of an irreconcilable conflict, with each controlling the matters within its \nrespective scope. Nothing in this Agreement shall require a Party or CAISO to take \naction inconsistent with an applicable Commission-accepted tariff, agreement, or \norder. \nSubject to the preceding paragraph: \n(a) the Formula Rate and Protocols shall control the calculation, information \nexchange, and true-up of LS Power Grid’s Net Revenue Requirement, including \nthe rate base treatment of the Covered Upgrades; Section 5.3 of the TO Tariff \nshall control the flow-through of TRBAA Credits to transmission customers \nthrough the TRBAA; and any dispute concerning a TRBAA Credit, or any other \nmatter arising under this Agreement, shall be resolved under Article 11, and any \nresulting adjustment shall be implemented as provided in Section 11.5. The \nMTRC Calculation Template in Schedule 5, and not the Formula Rate or \nProtocols, shall control calculation of the Estimated Annual MTRC and Final \nAnnual MTRC; \n(b) this Agreement shall control the determination and administration of the \nSupplemental MTRC, Cumulative Revenue Responsibility, Operational Security, \nprospective reassignment, and the other wholesale revenue-support obligations \nestablished herein; \n(c) the applicable Interconnection Agreement shall control the physical \ninterconnection, design, engineering, procurement, construction, testing, \nenergization, and operating requirements, except to the extent this Agreement \nexpressly establishes or supplements construction-cost, pre-service termination-\ncost, revenue-support, or Security obligations; provided that the applicable \ninstruments shall be interpreted, to the extent reasonably possible, to give effect \nto both agreements and prevent duplicate recovery; \n(d) each applicable Affected System Arrangement shall control the design, \nconstruction, ownership, operation, cost responsibility, financial security or \ncredit support, and cost recovery applicable to the corresponding Affected \nSystem Upgrade as between the parties to that arrangement. Nothing in this \nAgreement modifies an Affected System Owner’s tariff, makes LS Power Grid \nresponsible for an obligation of an Affected System Owner, or makes an \nAffected System Owner a Party to this Agreement;"},{"page":95,"startToken":40955,"endToken":41430,"text":"42 \n \n(e) the body of this Agreement shall control over a Schedule in the event of a \nconflict, except where the Schedule identifies a project-specific election, value, \nmethodology, or term that this Agreement expressly authorizes the Parties to \nestablish in the Schedule; and \n(f) the Schedules shall control over other project-specific supporting documents or \nworkpapers that have not been filed with or accepted by the Commission. \nThe Parties shall attempt to interpret the applicable instruments so that each is given \neffect and no provision is rendered superfluous. If an irreconcilable conflict affects a \nCommission-jurisdictional rate, term, or condition, the Parties shall seek any required \nCommission clarification, acceptance, or authorization. Pending resolution, the Parties \nshall continue performing all undisputed obligations. \n12.4. Governing Law. This Agreement shall be interpreted, governed by, and construed \nunder the laws of the State of California, without regard to the principles of conflict of \nlaws thereof, or the laws of the United States, as applicable, as if executed and to be \nperformed wholly within the State of California. \n12.5. Severability. If any term, covenant, or condition of this Agreement or the application \nor effect of any such term, covenant, or condition is held invalid as to any person, \nentity, or circumstance, or is determined to be unjust, unreasonable, unlawful, \nimprudent, or otherwise not in the public interest, by any court or government agency \nof competent jurisdiction, then such term, covenant, or condition shall remain in force \nand effect to the maximum extent permitted by law, and all other terms, covenants, \nand conditions of this Agreement and their application shall not be affected thereby \nbut shall remain in force and effect. The Parties shall be relieved of their obligations \nonly to the extent necessary to eliminate such regulatory or other determination, unless \na court or governmental agency of competent jurisdiction holds that such provisions \nare not severable from all other provisions of this Agreement. \n12.6. No Third Party Beneficiaries. Except for the rights of Large Load Customer and any \nSuccessor Eligible Customer under Section 6.12, this Agreement is not intended to and \ndoes not create rights, remedies, or benefits of any character whatsoever in favor of \nany persons, corporations, associations, or entities other than the Parties, and the \nobligations herein assumed are solely for the use and benefit of the Parties, their \nsuccessors in interest and, where permitted, their assigns. \n12.7. Survival. Expiration or termination of this Agreement shall not affect any right, \nliability, or obligation that accrued before the effective date of expiration or \ntermination or that, by its express terms or nature, is intended to continue thereafter. \nWithout limiting the foregoing, the following shall survive expiration or termination \nfor the period necessary to give them effect: \n(a) all outstanding payment, refund, reimbursement, reconciliation, true-up, Security, \nand release obligations arising under Articles 3, 4, 6, and 7;"},{"page":96,"startToken":41430,"endToken":41873,"text":"43 \n \n(b) the determination and final satisfaction, transfer, or prospective reassignment of \nthe Cumulative Revenue Responsibility; \n(c) the calculation and implementation of TRBAA Credits and other adjustments \nnecessary to prevent duplicate recovery; \n(d) the confidentiality and information-protection obligations applicable under \nSection 6.12, Section 16.3 of the TO Tariff, the CAISO Tariff, and any \napplicable confidentiality agreement; \n(e) the Parties’ rights to obtain, inspect, retain, verify, and challenge books, records, \nmetering data, settlement data, calculations, and supporting workpapers relating \nto periods before expiration or termination; \n(f) the indemnification obligations in Article 9 with respect to acts, omissions, \ncircumstances, or claims arising before expiration or termination; \n(g) the dispute-resolution provisions in Article 11 with respect to any surviving right, \nliability, or obligation; and \n(h) any provision that expressly states that it survives or that must survive to prevent \nduplicate recovery or give effect to the Parties’ rights and obligations. \nSurvival of a provision shall not extend the underlying payment or Security obligation \nbeyond the point at which that obligation has been finally satisfied, transferred, \nreassigned, refunded, or released in accordance with this Agreement. \n12.8. No Waiver. A Party’s delay or failure to exercise any right or remedy under this \nAgreement shall not constitute a waiver of that or any other right or remedy. A waiver \nshall be effective only if stated in a written instrument executed by the Party granting \nthe waiver and shall apply only to the specific matter and circumstances stated therein. \nA waiver on one occasion shall not constitute a continuing waiver or a waiver on any \nother occasion. No course of performance or dealing shall amend this Agreement or \nwaive any Commission-jurisdictional rate, term, or condition. Nothing in this Section \nlimits a Party’s rights under the Federal Power Act or Applicable Laws and \nRegulations. \n12.9. Counterparts and Electronic Signatures. This Agreement, any amendment, and any \nassumption or acknowledgment executed pursuant to it may be executed in \ncounterparts, each of which shall be deemed an original and all of which together shall \nconstitute one instrument. Signatures transmitted electronically, including by portable \ndocument format or an electronic-signature platform, shall have the same force and \neffect as original signatures to the extent permitted by Applicable Laws and \nRegulations. Each Party agrees that it shall not contest the validity or enforceability of \nan instrument solely because it was executed or transmitted electronically. \n12.10. Authority. Each Party represents and warrants that: \n(a) it is duly organized, validly existing, and in good standing under the laws of its \njurisdiction of organization, to the extent such concepts apply; \n(b) it has the requisite power and authority to execute, deliver, and perform this \nAgreement;"},{"page":97,"startToken":41873,"endToken":42191,"text":"44 \n \n(c) the execution, delivery, and performance of this Agreement have been duly \nauthorized by all necessary organizational action; \n(d) the individual executing this Agreement on its behalf is authorized to do so; and \n(e) subject to any required Commission acceptance or other regulatory approval \nexpressly identified in this Agreement, this Agreement constitutes its valid and \nbinding obligation, enforceable in accordance with its terms. \nThe Large Load Customer represents only that the individual executing the Limited \nAcknowledgment is authorized to execute that acknowledgment on its behalf. \nExecution of the Limited Acknowledgment does not make the Large Load Customer a \nParty or expand its obligations beyond those expressly stated in the Limited \nAcknowledgment or in a separate undertaking executed by the Large Load Customer. \n12.11. Notices. All notices, requests, demands, and other communications hereunder (herein \ncollectively called “Notice”) shall be in writing and will be deemed to have been duly \ngiven when (a) personally delivered to the receiving Party’s physical address, (b) sent \nby overnight courier service to the receiving Party’s physical address, or (c) delivered \nvia electronic transmission with a courtesy copy sent by overnight courier service to \nthe receiving Party’s physical address, in each case to the appropriate addresses or \nemail addresses set forth below (or to such other addresses or email addresses as a \nParty may designate by Notice to the other Party); provided that any such deliveries \nreceived after normal business hours in the place of business of the receiving Party \nshall be deemed to be received on the next Business Day: \n \nIf to LS Power Grid: \n \nLS Power Grid California, LLC \nAttn: Asset Manager \n16150 Main Circle Drive, Suite 310 \nChesterfield, Missouri 63017 \nEmail: rhohlt@lspower.com \n \nWith a copy to: \n \nLS Power Grid California, LLC \nAttn: Legal Department \n16150 Main Circle Drive, Suite 310 \nChesterfield, Missouri 63017 \nEmail: legalnotices@lspower.com \n \nIf to Eligible Customer: \n \n[Company name] \n[Contact name] \n[Address] \nEmail: [Insert]"},{"page":98,"startToken":42191,"endToken":42396,"text":"45 \n \nIf to Large Load Customer: \n[Company name] \n[Contact name] \n[Address] \nEmail: [Insert] \n12.12. Reservation of Rights. LS Power Grid shall have the right to make a unilateral filing \nwith the Commission under Section 205 of the Federal Power Act to modify this \nAgreement or the pro forma form of this Agreement, and Eligible Customer shall have \nthe right to make a unilateral filing with the Commission under Section 206 of the \nFederal Power Act to modify this Agreement. Each Party shall have the right to protest \nany such filing and to participate fully in any proceeding before the Commission. The \nstandard of review for any proposed change to this Agreement, whether proposed by a \nParty, a non-party, or the Commission acting on its own motion, shall be the just and \nreasonable standard under Sections 205 and 206 of the Federal Power Act. \n \n13. Project-Specific Schedules \n13.1. Required Schedules. Each executed Agreement shall include the following completed \nschedules, which are incorporated into this Agreement. \nSchedule 1 — Project and Allocation Data; \nSchedule 2 — Qualifying Transmission Revenues Methodology; \nSchedule 3 — Credit and Security Standards; \nSchedule 4 — CAISO Regional Project Allocation and Responsibility; and \nSchedule 5 — MTRC Calculation Template and Cumulative Revenue Ledger \n[Signature page follows.]"},{"page":99,"startToken":42396,"endToken":42536,"text":"46 \n \nIN WITNESS WHEREOF, the Parties have caused this Agreement to be duly executed by their \nduly authorized officers as of the day and year first above written. \n \nLS POWER GRID CALIFORNIA, LLC \nBy: __________________________ \nName: ________________________ \nTitle: _________________________ \nDate: _________________________ \n[ELIGIBLE CUSTOMER] \nBy: __________________________ \nName: ________________________ \nTitle: _________________________ \nDate: _________________________ \n \nLIMITED ACKNOWLEDGMENT OF LARGE LOAD CUSTOMER \nLarge Load Customer acknowledges the assignment of cost responsibility to its facility and \nagrees to provide information and notices, authorize release of metering and settlement data, and \ncooperate in a transition to a Successor Eligible Customer. This acknowledgment does not make \nLarge Load Customer the wholesale obligor, establish a FERC-jurisdictional retail rate, or \nconstitute a guarantee of Eligible Customer’s payment obligations. Any separate guarantee or \ncollateral undertaking by Large Load Customer shall be governed by its own terms and filed \nwith FERC if required. \n[LARGE LOAD CUSTOMER] \nBy: __________________________ \nName: ________________________ \nTitle: _________________________ \nDate: _________________________"},{"page":100,"startToken":42536,"endToken":42674,"text":"Schedule 1 - 1 \n \nSchedule 1 \nProject and Allocation Data \n1. Purpose \nThis Schedule identifies the Large Load Facility, the applicable service request, each Large \nLoad-Driven Upgrade covered by this Agreement, the initial allocation of each Large Load-\nDriven Upgrade, and the applicable construction and operational security information. This \nSchedule is incorporated into and made part of the Agreement. \n2. Large Load Facility and Service Information \nLarge Load Customer \n[●] \nEligible Customer \n[●] \nLarge Load Facility\n[Name and description]\nPhysical Location of Large \nLoad Facility\n[●] \nPoint of Interconnection \n[●] \nMetering Point or Settlement \nIdentifier\n[●] \nRequested Service Level \n[●] MW \nRequested Service Phases \n[Identify the MW and expected commencement date of \neach phase]\nExpected Large Load Service \nCommencement Date\n[●] \nOutside Date \n[●] \nApplicable Study or \nAuthorization\n[Study name, number, version, and date] \nApplicable Interconnection, \nTransmission Service, or Other \nAgreement\n[●] \nCAISO or Other Relevant \nProject Identifier\n[●]"},{"page":101,"startToken":42674,"endToken":42727,"text":"Schedule 1 - 2 \n \n3. Large Load-Driven Upgrade Information \nEach Large Load-Driven Upgrade shall be identified separately. \nUpgrade 1 \nUpgrade Description \n[●] \nApplicable Study or \nAuthorization\n[●] \nOwner and Construction \nResponsibility\n[●] \nInitial Estimated Capital Cost \n$[●] \nExpected Construction \nCommencement Date\n[●] \nExpected Upgrade In-Service \nDate\n[●] \nActual Upgrade In-Service Date [●] \nMTRC Term End Date \n[●] \nShared, Phased, or Dependent \nFacility\n[●]"},{"page":102,"startToken":42727,"endToken":42804,"text":"Schedule 1 - 3 \n \nUpgrade 2 \nUpgrade Description \n[●] \nApplicable Study or \nAuthorization\n[●] \nOwner and Construction \nResponsibility\n[●] \nInitial Estimated Capital Cost \n$[●] \nExpected Construction \nCommencement Date\n[●] \nExpected Upgrade In-Service \nDate\n[●] \nActual Upgrade In-Service Date [●] \nMTRC Term End Date \n[●] \nShared, Phased, or Dependent \nFacility\n[●] \n \nUpgrade 3 \nUpgrade Description \n[●] \nApplicable Study or \nAuthorization\n[●] \nOwner and Construction \nResponsibility\n[●] \nInitial Estimated Capital Cost \n$[●] \nExpected Construction \nCommencement Date\n[●] \nExpected Upgrade In-Service \nDate\n[●] \nActual Upgrade In-Service Date [●] \nMTRC Term End Date \n[●] \nShared, Phased, or Dependent \nFacility\n[●]"},{"page":103,"startToken":42804,"endToken":42906,"text":"Schedule 1 - 4 \n \n \n4. Initial Allocation and Annual MTRC Information \nFor each Large Load-Driven Upgrade, the Initial Allocation Percentage assigned to the Large \nLoad Customer under this Agreement shall be identified below. The sum of the percentages \nallocated to all Large Load Customers for a Large Load-Driven Upgrade shall not exceed one \nhundred percent (100%). \nUpgrade 1 \nInitial Estimated Annual \nMTRC Attributable to Covered \nUpgrade \n$[●] \nInitial Allocation Percentage \nAssigned to This Large Load \nCustomer\n[●]% \nInitial Estimated Annual \nMTRC Allocated to This Large \nLoad Customer \n$[●] \nAggregate Initial Allocation \nPercentage Assigned to All \nLarge Load Customers\n[●]% \nPercentage Allocated to Other \nSystem Needs or Customers\n[●]%"},{"page":104,"startToken":42906,"endToken":43043,"text":"Schedule 1 - 5 \n \nUpgrade 2 \nInitial Estimated Annual \nMTRC Attributable to Covered \nUpgrade \n$[●] \nInitial Allocation Percentage \nAssigned to This Large Load \nCustomer\n[●]% \nInitial Estimated Annual \nMTRC Allocated to This Large \nLoad Customer \n$[●] \nAggregate Initial Allocation \nPercentage Assigned to All \nLarge Load Customers\n[●]% \nPercentage Allocated to Other \nSystem Needs or Customers\n[●]% \n \nUpgrade 3 \nInitial Estimated Annual \nMTRC Attributable to Covered \nUpgrade \n$[●] \nInitial Allocation Percentage \nAssigned to This Large Load \nCustomer\n[●]% \nInitial Estimated Annual \nMTRC Allocated to This Large \nLoad Customer \n$[●] \nAggregate Initial Allocation \nPercentage Assigned to All \nLarge Load Customers\n[●]% \nPercentage Allocated to Other \nSystem Needs or Customers\n[●]% \n \nAny portion of a Large Load-Driven Upgrade not allocated to a Large Load Customer shall be \nexcluded from the Annual MTRC allocable to any Large Load Customer and shall remain \nsubject to otherwise-applicable CAISO cost allocation and rate recovery requirements."},{"page":105,"startToken":43043,"endToken":43167,"text":"Schedule 1 - 6 \n \n5. Allocation Methodology and Capability Basis \nThe Initial Allocation Percentage for each Large Load-Driven Upgrade is supported by the \nfollowing study findings and allocation methodology: \nUpgrade 1 \nCustomers or Projects Studied \nTogether\n[●] \nAllocation Methodology \n[●] \nRequested Service or Electrical \nImpact Used in Allocation\n[●] \nIncremental Capability Created \nby Upgrade, if Quantified\n[●] MW or other applicable measure \nCapability Initially Assigned to \nThis Large Load Customer\n[●] \nExplanation of Any Percentage \nAllocated to Other System \nNeeds or Customers\n[●] \nUpgrade 2 \nCustomers or Projects Studied \nTogether\n[●] \nAllocation Methodology \n[●] \nRequested Service or Electrical \nImpact Used in Allocation\n[●] \nIncremental Capability Created \nby Upgrade, if Quantified\n[●] MW or other applicable measure \nCapability Initially Assigned to \nThis Large Load Customer\n[●] \nExplanation of Any Percentage \nAllocated to Other System \nNeeds or Customers\n[●]"},{"page":106,"startToken":43167,"endToken":43334,"text":"Schedule 1 - 7 \n \nUpgrade 3 \nCustomers or Projects Studied \nTogether\n[●] \nAllocation Methodology \n[●] \nRequested Service or Electrical \nImpact Used in Allocation\n[●] \nIncremental Capability Created \nby Upgrade, if Quantified\n[●] MW or other applicable measure \nCapability Initially Assigned to \nThis Large Load Customer\n[●] \nExplanation of Any Percentage \nAllocated to Other System \nNeeds or Customers\n[●] \n \nThe allocation methodology shall account for, as applicable: \n(a) Large Load Customers studied individually, jointly, or in a cluster; \n(b) the extent to which two or more Large Load Customers caused the need for or share a \nLarge Load-Driven Upgrade; \n(c) differing requested service levels, electrical impacts, development phases, and facility \nconfigurations; \n(d) facilities constructed in phases or placed in service on different dates; and \n(e) any portion of a facility determined at the outset to serve other system needs or \ncustomers. \n6. Initial Cumulative Revenue Responsibility and Security Information \nUpgrade 1 \nInitial Projected Cumulative \nRevenue Responsibility\n$[●] \nConstruction Security \nAttributable to Upgrade\n$[●] \nDate Operational Security Must \nBecome Effective\n[●] \nInitial Projected Incremental \nOperational Security \nAttributable to Upgrade\n$[●]"},{"page":107,"startToken":43334,"endToken":43513,"text":"Schedule 1 - 8 \n \nUpgrade 2 \nInitial Projected Cumulative \nRevenue Responsibility\n$[●] \nConstruction Security \nAttributable to Upgrade\n$[●] \nDate Operational Security Must \nBecome Effective\n[●] \nInitial Projected Incremental \nOperational Security \nAttributable to Upgrade\n$[●] \nUpgrade 3 \nInitial Projected Cumulative \nRevenue Responsibility\n$[●] \nConstruction Security \nAttributable to Upgrade\n$[●] \nDate Operational Security Must \nBecome Effective\n[●] \nInitial Projected Incremental \nOperational Security \nAttributable to Upgrade\n$[●] \n \nThe Initial Projected Cumulative Revenue Responsibility stated above represents the initial \nprojection of the Total Required Revenue Commitment for the applicable Large Load-Driven \nUpgrade, calculated as the Estimated Annual MTRC multiplied by twenty (20) using the MTRC \nCalculation Template in Schedule 5. \nConstruction Security shall remain applicable separately to each Large Load-Driven Upgrade \nuntil that upgrade reaches its Upgrade In-Service Date and the applicable conditions for release \nor conversion under Section 7.2 have been satisfied. \nOperational Security must be fully effective before the applicable Upgrade In-Service Date. If \ndifferent Large Load-Driven Upgrades are expected to reach their Upgrade In-Service Dates on \ndifferent dates, LS Power Grid shall recalculate the required Operational Security before each \nsubsequent Upgrade In-Service Date in accordance with Article 7."},{"page":108,"startToken":43513,"endToken":44003,"text":"Schedule 1 - 9 \n \n7. Schedule Qualifications \n7.1 Projected Amounts. The capital costs, Estimated Annual MTRC, projected Total \nRequired Revenue Commitment, Cumulative Revenue Responsibility, and Operational Security \namounts stated in this Schedule are initial projections provided for planning and administration \npurposes. They do not constitute fixed amounts, caps, or guarantees.  \n7.2 Initial and Applicable Allocation Percentages. The Initial Allocation Percentage \nidentified for each Large Load-Driven Upgrade shall remain the initial allocation of that upgrade \nto the Large Load Customer. The Applicable Allocation Percentage shall equal the Initial \nAllocation Percentage, as adjusted prospectively by any reassignment effective under Section 6.9 \nor as otherwise required by a final Commission order or applicable tariff provision. \nA change in capital costs, the Upgrade In-Service Date, Formula Rate inputs, or the annual \nrevenue requirement shall not, by itself, change the Initial Allocation Percentage or Applicable \nAllocation Percentage. Cancellation, abandonment, downsizing, curtailment, permanent \ncessation, or material reduction of service by the Large Load Customer also shall not, by itself, \nreduce either percentage. \n7.3 Allocation Limitation. The aggregate Annual MTRC assigned to all Large Load \nCustomers for a Covered Upgrade shall not exceed one hundred percent (100%) of the Annual \nMTRC for that Covered Upgrade. LS Power Grid shall not allocate the same upgrade cost, \ntransmission capability, or annual revenue requirement to more than one Large Load Customer. \n7.4 Upgrade In-Service Dates and MTRC Term End Dates. Each Expected Upgrade In-\nService Date stated in this Schedule is a planning estimate. LS Power Grid shall provide written \nnotice to Eligible Customer of a material change to an Expected Upgrade In-Service Date. \nWithin five (5) Business Days after a Covered Upgrade achieves its Upgrade In-Service Date, \nLS Power Grid shall provide written notice to Eligible Customer stating the actual Upgrade In-\nService Date and the corresponding MTRC Term End Date. LS Power Grid shall update this \nSchedule and the applicable Cumulative Revenue Ledger to reflect those dates. The actual \nUpgrade In-Service Date shall be determined in accordance with the definition of that term in the \nAgreement. Inclusion of pre-service Construction Work in Progress in rate base does not \nconstitute an Upgrade In-Service Date. \n7.5 Annual Updates. Changes in the Estimated Annual MTRC, Final Annual MTRC, Total \nRequired Revenue Commitment, Cumulative Revenue Responsibility, Supplemental MTRC, \nQualifying Transmission Revenues, or Operational Security resulting from the MTRC \nCalculation Template in Schedule 5, the Annual Projection, the Annual Update and \nReconciliation Statement, or an effective prospective reassignment under Section 6.9 do not \nrequire an amendment to this Schedule. \n7.6 Prospective Reassignment. LS Power Grid shall maintain the customer-, project-, and \nupgrade-specific ledger required by Sections 6.7 and 6.9. Any prospective reassignment shall be \nreflected in that ledger and in the applicable Annual Projection and Reconciliation Statement. A \nprospective reassignment shall adjust the Applicable Allocation Percentage but shall not revise \nthe Initial Allocation Percentage, produce a historical refund, or reopen a prior Rate Year."},{"page":109,"startToken":44003,"endToken":44320,"text":"Schedule 1 - 10 \n \n7.7 Updated Expected Dates. An update to an expected construction commencement date, \nExpected Upgrade In-Service Date, or expected Large Load Service Commencement Date may \nbe made by written notice and does not require an amendment to this Schedule unless the update \nalso changes a material rate, term, condition, facility scope, or allocation established by this \nAgreement. \n8. Supporting Materials \nThe following supporting materials are attached to or incorporated by reference into this \nSchedule: \n1. the applicable final transmission study or studies; \n2. the facilities list and cost estimate supporting each Large Load-Driven Upgrade; \n3. the study-based allocation methodology and calculations; \n4. the initial Annual MTRC and Total Required Revenue Commitment workpapers (per \nSchedule 5); \n5. the initial Cumulative Revenue Responsibility calculation; \n6. the Construction Security calculation; \n7. the initial projected Operational Security calculation; \n8. any applicable project diagrams, metering diagrams, or service-phase schedules; and \n9. each applicable Affected System study, Affected System Arrangement, and evidence of \nrequired financial security or credit support. \n9. Affected System Information \nThe following information shall be completed for each potential or confirmed Affected System. \nEligible Customer shall update the information and provide the documentation required by \nSection 4.2 if an Affected System or Affected System Upgrade is identified or the status of an \nAffected System Arrangement changes. \n1. Affected System Owner: [●] \n2. CAISO Participating TO or External Affected System: [●] \n3. Applicable Study and Project Identifier: [●] \n4. Identified System Impact: [●] \n5. Affected System Upgrade: [●] \n6. Estimated Cost: $[●] \n7. Affected System Arrangement: [Agreement name, parties, and date] \n8. Required Construction Financial Security or Credit Support: $[●] \n9. Required Post-In-Service Financial Security or Credit Support: $[●] \n10. Commission Filing or Acceptance Required: [Yes/No; docket and status] \n11. Deadline for Delivery to LS Power Grid: [●] \n12. Current Status: [Pending/Executed/Effective] \n13. If no Affected System or Affected System Upgrade has been identified when this \nSchedule is executed, insert the following certification:"},{"page":110,"startToken":44320,"endToken":44360,"text":"Schedule 1 - 11 \n \nNo Affected System or Affected System Upgrade has been identified as of [date]. This \nstatement does not limit Eligible Customer’s continuing obligations under Section 4.2 if \nan Affected System or Affected System Upgrade is subsequently identified."},{"page":111,"startToken":44360,"endToken":44655,"text":"Schedule 2 - 1 \n \nSchedule 2 \nQualifying Transmission Revenues Methodology \n1. Purpose and Controlling Principles \nThis Schedule establishes the reproducible methodology for calculating projected and actual \nQualifying Transmission Revenues attributable to the Large Load Facility. It is intended to \nidentify wholesale transmission revenues paid by or on behalf of Eligible Customer that are \nattributable to the Large Load Facility and reduce transmission revenues otherwise collected \nfrom CAISO customers or directly credit LS Power Grid’s Net Revenue Requirement. Such \nrevenues may include applicable TAC revenues and qualifying Wheeling Access Charges or \nother wholesale transmission-access, wheeling, or transmission-service charges under the \nCAISO Tariff or another Commission-accepted arrangement, including charges paid through a \nnon-PTO serving entity. The Supplemental MTRC therefore measures only the remaining \nshortfall below the applicable Annual MTRC. \nQualifying Transmission Revenues shall be counted once in calculating the Supplemental MTRC \nand the Cumulative Revenue Responsibility against the combined Annual MTRC for all Covered \nUpgrades. They shall not also be treated as a TRBAA Credit under Section 6.8 because they \nreduce transmission revenues otherwise collected from CAISO customers. This Schedule does \nnot modify CAISO settlement rules, establish a retail rate, impose any obligation on CAISO, or \nalter any cost allocation established under the CAISO Requirements. \n2. Project and Settlement Identifiers \nThe following information shall be completed for each Large Load Facility and updated \nadministratively when a meter, settlement identifier, Eligible Customer, or other listed item \nchanges. An administrative update that does not alter the Commission-accepted methodology \ndoes not require an amendment to the Agreement unless a filing is otherwise required by \nApplicable Laws and Regulations. \nLarge Load Customer \n[●] \nLarge Load Facility \n[●] \nPhysical location and applicable \nCAISO or out-of-state service \narea\n[●] \nEligible Customer at service \ncommencement\n[●] \nScheduling Coordinator \n[●] \nUtility Distribution Company, \nMetered Subsystem, or non-\nPTO serving entity\n[●]"},{"page":112,"startToken":44655,"endToken":44957,"text":"Schedule 2 - 2 \n \nCAISO resource, settlement, or \nload identifier(s)\n[●] \nRevenue-quality meter \nidentifier(s) and location(s)\n[●] \nMetering point used for this \ncalculation\n[●] \nLarge Load Service \nCommencement Date\n[●] \nApplicable TAC, Wheeling \nAccess Charge, or other CAISO \nTariff charge(s)\n[●] \nPrimary source of settlement \nand metering data\n[●] \n \n3. Data Sources and Responsibilities \n(a) LS Power Grid shall calculate projected and actual Qualifying Transmission Revenues \nusing the best available data from CAISO settlement statements, wheeling, transmission-\naccess, and transmission service invoices, revenue-quality meter data, Eligible Customer \nand non-PTO serving entity billing records, Scheduling Coordinator records, and other \ndata made available under the CAISO Tariff, another Commission-accepted arrangement, \nor authorized by Eligible Customer and Large Load Customer. \n(b) Eligible Customer shall provide, or cause its Scheduling Coordinator, Utility Distribution \nCompany, Metering Coordinator, or other authorized agent to provide, all information \nreasonably necessary to identify and verify withdrawals attributable to the Large Load \nFacility. Eligible Customer shall maintain all authorizations reasonably necessary for \nrelease of that information. \n(c) The Large Load Customer shall provide the information and authorizations required by \nits Limited Acknowledgment, including information needed to distinguish the Large \nLoad Facility from other load behind a common meter or within a common settlement \nidentifier. \n(d) LS Power Grid may use CAISO data made available under the CAISO Requirements or \nthrough the authorizations provided under this Agreement. Nothing in this Schedule \nmakes CAISO a party to the Agreement or independently requires CAISO to calculate, \ninvoice, collect, or administer the Supplemental MTRC. \n(e) If final data are unavailable when a projection, invoice, Annual Update, or Reconciliation \nStatement is due, LS Power Grid may use a reasonable estimate based on the most recent \navailable data, the service forecast, applicable TAC rates, and known settlement \nadjustments. Estimated amounts shall be replaced with actual data in the next practicable \nreconciliation."},{"page":113,"startToken":44957,"endToken":45404,"text":"Schedule 2 - 3 \n \n4. Applicable Withdrawals \nFor each CAISO settlement interval or other reproducible billing interval, Applicable \nWithdrawals shall equal the metered energy withdrawals attributable to the Large Load Facility \nat the metering point identified in Section 2 of this Schedule, expressed in MWh and adjusted as \nfollows: \n(a) Imports, exports, station service, auxiliary load, behind-the-meter generation, storage \ncharging and discharging, and other injections or withdrawals shall be treated \nconsistently with the manner in which they are recognized for the applicable TAC charge \nunder the CAISO Tariff. \n(b) Distribution losses and transmission losses shall be included only to the extent they are \nincluded in the billing determinant for the applicable TAC component. The loss factor or \nmethod shall be identified in the project-specific table in Section 10 of this Schedule. \n(c) If the Large Load Facility shares a meter or settlement identifier with other load, the \nwithdrawals attributable to the Large Load Facility shall be determined from revenue-\nquality submeters or another objective allocation method identified in Section 10 of this \nSchedule. An allocation based solely on estimates may be used temporarily but shall be \nreconciled when reliable data become available. \n(d) Withdrawals shall not be counted for a period before the corresponding Annual MTRC is \nincluded in the Supplemental MTRC calculation under Section 6.4 of the Agreement, \nexcept where necessary to correct a prior-period error or resettlement. \n5. Applicable TAC Revenue \nApplicable TAC Revenue for an interval shall equal Applicable Withdrawals multiplied by the \nCAISO transmission rate or rates actually applicable to those withdrawals for that interval. The \ncalculation shall include only transmission charge components that contribute to recovery of the \nrevenue requirement in which LS Power Grid’s costs are included. It shall exclude retail \ndistribution charges, generation charges, non-transmission surcharges, taxes collected for another \ngovernmental entity, and any other charge that does not contribute to recovery of LS Power \nGrid’s transmission revenue requirement. \nIf CAISO uses a monthly, annual, or other non-interval billing determinant, LS Power Grid shall \nperform the calculation using that same billing period and determinant. If more than one TAC \nrate or component applies, each component shall be calculated separately before applying the LS \nPower Grid Allocation Factor. \n6. LS Power Grid Allocation Factor \nThe LS Power Grid Allocation Factor shall identify the portion of Applicable TAC Revenue \nallocable to LS Power Grid for the relevant period. Unless a different Commission-accepted \nmethod is stated in Section 10 of this Schedule, the factor shall be calculated from the same \nrevenue requirement, billing determinant, allocation percentage, and other inputs used by CAISO \nto include LS Power Grid’s net transmission revenue requirement in the applicable TAC rate. \nFor each applicable rate component and period:"},{"page":114,"startToken":45404,"endToken":45842,"text":"Schedule 2 - 4 \n \nLS Power Grid Allocation Factor = LS Power Grid Net Revenue Requirement included in \nthe applicable TAC component ÷ Total Net Revenue Requirement recovered through that \nTAC component. \nIf LS Power Grid’s revenue requirement is recovered through a project-specific, zonal, or other \ndirect allocation rather than a systemwide factor, the corresponding Commission-accepted \nallocation percentage or rate component shall be used. The supporting workpapers shall identify \nthe source and calculation of each factor. \n7. Calculation of Qualifying Transmission Revenues \nProjected and actual Qualifying Transmission Revenues shall be calculated as follows for each \napplicable interval, month, or billing period and then aggregated for the Rate Year or partial Rate \nYear: \nQualifying Transmission Revenues =  Qualifying TAC Revenue + Qualifying Wheeling and \nOther Wholesale Transmission Revenues ± Applicable Adjustments. \nQualifying TAC Revenue = Σ [(Applicable Withdrawals × Applicable TAC Rate) × LS Power \nGrid Allocation Factor]. Qualifying Wheeling and Other Wholesale Transmission Revenues \nequal Wheeling Access Charges and other wholesale transmission-access, wheeling, or \ntransmission-service charges actually paid by or on behalf of Eligible Customer to CAISO, a \nParticipating TO, or a non-PTO transmission or load-serving entity for deliveries serving the \nLarge Load Facility, but only to the extent those revenues reduce transmission revenues \notherwise collected through TAC or directly credit LS Power Grid’s Net Revenue Requirement. \nApplicable Adjustments shall include only amounts attributable to the Large Load Facility, \nincluding CAISO resettlements, billing corrections, refunds, charge reversals, balancing-account \nadjustments, and other adjustments that change the qualifying transmission revenue. Bad debt or \nuncollectible amounts shall reduce Qualifying Transmission Revenues only to the extent the \ncorresponding revenue is not recovered from another source and is not otherwise included in LS \nPower Grid’s Formula Rate recovery. \n8. Projections, Actuals, Resettlements, and Customer Changes \n(a) The Annual Projection shall use forecast withdrawals, then-effective or forecast TAC \nrates, the most recent LS Power Grid Allocation Factor, and known adjustments. The \nworkpapers shall separately identify each material assumption. \n(b) The Reconciliation Statement shall replace projected values with actual withdrawals, \nrates, factors, and adjustments for the applicable period. CAISO resettlements or other \ncorrections received after a Reconciliation Statement becomes final shall be reflected in \nthe next practicable Reconciliation Statement and Annual Update, subject to Section 6.6 \nof the Agreement, and any dispute concerning them shall be resolved under Article 11 of \nthe Agreement. \n(c) A change in Eligible Customer, Scheduling Coordinator, or retail service provider shall \nnot interrupt the calculation or cause the same withdrawals or revenues to be omitted or \ncounted more than once. Qualifying Transmission Revenues shall remain associated with \nthe Large Load Customer and Large Load Facility, regardless of which Eligible \nCustomer is responsible for payment during the applicable period."},{"page":115,"startToken":45842,"endToken":46094,"text":"Schedule 2 - 5 \n \n(d) If two or more Eligible Customers serve the Large Load Facility during a Rate Year, the \nQualifying Transmission Revenues and corresponding Supplemental MTRC shall be \nassigned between them based on the periods during which each provided service, unless \nthe applicable transition agreement provides another Commission-accepted allocation. \n9. Workpapers, Verification, and Records \nWith each Annual Projection and Reconciliation Statement, LS Power Grid shall provide \nworkpapers sufficient for Eligible Customer to reproduce the calculation, including applicable \nmeter quantities, TAC rates, LS Power Grid Allocation Factors, adjustments, source references, \nand a reconciliation to the corresponding Supplemental MTRC and Cumulative Revenue Ledger. \nCustomer-specific or commercially sensitive information may be provided subject to the \nconfidentiality provisions of Section 16.3 of the TO Tariff, the CAISO Tariff, and any applicable \nconfidentiality agreement. \nLS Power Grid, Eligible Customer, and Large Load Customer shall retain supporting records for \nthe period required by the CAISO Tariff, Commission regulations, and Applicable Laws and \nRegulations, and in all events until completion of any timely initiated review, audit, or dispute \nconcerning the applicable Rate Year. Any dispute concerning the calculation shall be resolved \nunder Article 11 of the Agreement. \n10. Project-Specific Methodology Elections \nApplicable Withdrawals \nmethodology\n[●] \nTreatment of shared meters or \nidentifiers\n[●] \nTreatment of behind-the-meter \ngeneration and storage\n[●] \nApplicable TAC, Wheeling \nAccess Charge, or other CAISO \nTariff rate component(s)\n[●] \nLS Power Grid Allocation \nFactor methodology\n[●] \nLoss factor or loss methodology \n[●] \nTreatment of exports and \nstation service\n[●] \nTreatment of refunds and \nresettlements\n[●] \nTreatment of bad debt or \nuncollectible amounts\n[●]"},{"page":116,"startToken":46094,"endToken":46260,"text":"Schedule 2 - 6 \n \nProjection methodology \n[●] \nData-delivery process and \ntiming\n[●] \nOther Commission-accepted \nproject-specific provision\n[●] \n \nThe methodology shall specify the metering point, applicable local and regional TAC \ncomponents, LS Power Grid allocation factor, applicable Wheeling Access Charges or other \nwholesale transmission access, wheeling, or transmission charges, the identity of any non-PTO \nserving entity collecting the charge, the basis for attributing each charge to the Large Load \nFacility, and evidence that the charge reduces transmission revenues otherwise collected through \nTAC or directly credits LS Power Grid’s Net Revenue Requirement. It also shall specify \ntreatment of losses, refunds, resettlements, bad debt and balancing-account adjustments, \ntreatment of a change in Eligible Customer, the source of billing and meter data, and the \ncalculation and verification of projected and actual revenue. Qualifying Transmission Revenues \ncount toward the annual and cumulative responsibility but are not separately credited against LS \nPower Grid’s transmission revenue requirement because they already reduce transmission \nrevenues otherwise collected from CAISO customers or directly credit LS Power Grid’s Net \nRevenue Requirement."},{"page":117,"startToken":46260,"endToken":46583,"text":"Schedule 3 - 1 \n \n \nSchedule 3 \nCredit and Security Standards \n1. Purpose and Application \nThis Schedule establishes the forms, delivery, maintenance, replacement, draw, application, and \nrelease requirements for all Construction Security and Operational Security required under \nArticle 7. Except for the limited reduction of direct Operational Security provided in Section 3, \nall Security shall be provided directly by Eligible Customer. \n2. Permitted Forms of Security \nEligible Customer may provide Security in the form of cash, a Letter of Credit, or any \ncombination thereof. LS Power Grid may accept another form of Security if it determines, in its \nsole discretion, that the form is acceptable. \nCash collateral shall be delivered in immediately available funds to an account designated by LS \nPower Grid and shall count dollar-for-dollar toward the applicable Required Security Amount \nwhile held by LS Power Grid. \n(a) Construction Security \nEligible Customer shall provide and maintain all Construction Security directly in one or more \nforms permitted under this Section 2. A Retail Security Certification and Qualifying Retail \nSecurity Support shall not constitute, reduce, replace, or satisfy Construction Security or any Pre-\nIn-Service Termination Costs. \n(b) Operational Security \nExcept to the extent reduced under Section 3, Eligible Customer shall provide and maintain \ndirect Operational Security in one or more forms permitted under this Section 2 in an amount \nequal to one hundred percent (100%) of the nominal Remaining Cumulative Revenue \nResponsibility. \n3. Retail Security Certification \nA current Retail Security Certification reduces the direct Operational Security requirement \ndollar-for-dollar by the amount of Qualifying Retail Security Support identified in that \ncertification. It does not reduce Eligible Customer’s underlying obligations, constitute Security \nposted directly with LS Power Grid, or apply to Construction Security or Pre-In-Service \nTermination Costs. \nEach Retail Security Certification must be substantially in the form of Exhibit A contained in \nSchedule 3 of this Agreement. Eligible Customer shall deliver a Retail Security Certification \nbefore first relying on Qualifying Retail Security Support to reduce the direct Operational"},{"page":118,"startToken":46583,"endToken":47039,"text":"Schedule 3 - 2 \n \nSecurity requirement. The Retail Security Certification shall remain effective unless and until \nsuperseded, withdrawn, or deemed ineffective under this Agreement. Eligible Customer shall \ndeliver an updated Retail Security Certification within three (3) Business Days after any \nreduction, draw, expiration, nonrenewal, termination, amendment, loss of enforceable draw or \napplication rights, or other event that could impair the certified support. \nWith each Reconciliation Statement, LS Power Grid may identify the amount of Qualifying \nRetail Security Support then reflected in calculating Required Operational Security. That \nidentification does not require Eligible Customer to deliver a new Retail Security Certification \nunless an event requiring an update has occurred. \nLS Power Grid may rely on the certification without reviewing the underlying retail security \ndocuments in the ordinary course, but may request supporting information after a payment \ndefault, Credit Review Event, Material Adverse Credit Event, or reasonable basis to question the \ncertification. \n4. Letter of Credit Requirements \nIf Eligible Customer provides a Letter of Credit as Security, the Letter of Credit must be \nirrevocable, unconditional, transferable, payable at sight, and permit partial and multiple draws. \nIt must be issued by a major United States commercial bank or United States branch of a major \nforeign commercial bank rated at least A- by S&P, A3 by Moody’s, or A- by Fitch, in each case \nby at least two of those three agencies, and otherwise be in form and substance reasonably \nacceptable to LS Power Grid. \nEach Letter of Credit must have an initial stated term of at least twelve (12) months and provide \nLS Power Grid at least ninety (90) Calendar Days’ prior written notice of nonrenewal. Eligible \nCustomer shall provide a conforming extension, replacement Letter of Credit, cash collateral, or \nother Security accepted by LS Power Grid no later than sixty (60) Calendar Days before the \napplicable expiration date following a notice of nonrenewal, and within fifteen (15) Business \nDays after an issuer rating reduction. \nIf Eligible Customer fails to timely provide the required replacement or substitute Security, LS \nPower Grid may, before the applicable Letter of Credit expires, draw all or any portion of the \nthen-available amount and retain the proceeds as cash collateral, apply the proceeds to secured \nobligations, or both. \n5. Security Notices; Maintenance; and Replenishment \nLS Power Grid may issue a Security Notice whenever it reasonably determines that the Required \nSecurity Amount exceeds available Security, including as a result of a draw, application of cash \ncollateral, change in the Required Security Amount, loss of Qualifying Retail Security Support, \nor other event affecting Security availability. \nEligible Customer shall provide any required increase, restoration, replacement, or other cure \nwithin fifteen (15) Business Days after receipt of the Security Notice, or by the applicable in-\nservice date if earlier."},{"page":119,"startToken":47039,"endToken":47209,"text":"Schedule 3 - 3 \n \n6. Draws; Application; and Release \nLS Power Grid may draw against a Letter of Credit, apply cash collateral, or apply another \naccepted form of Security as permitted under Article 7. A draw, the holding of proceeds or cash \ncollateral, or replenishment does not by itself satisfy an obligation or reduce Cumulative \nRevenue Responsibility. Proceeds of Operational Security become Applied Security Proceeds \nonly when applied to an identified secured obligation as provided in Section 7.6; proceeds of \nConstruction Security are treated as provided in Sections 3.3.2 and 3.3.3. \nLS Power Grid shall release excess Security after the applicable Reconciliation Statement \nbecomes final. LS Power Grid shall release all remaining Security within thirty (30) Calendar \nDays after final satisfaction of all secured obligations, subject to any specifically identified \nunresolved dispute. \n7. Required Security Amount Not a Limitation \nThe Required Security Amount is based on then-current estimates and calculations and does not \nlimit Eligible Customer’s total liability or responsibility for its obligations under this Agreement."},{"page":120,"startToken":47209,"endToken":47545,"text":"Schedule 3, Exhibit A \nForm of Retail Security Certification \nRetail Security Certification \nTo: LS Power Grid California, LLC \nRe: Large Load Cost Recovery Agreement dated [●] between LS Power Grid California, LLC \nand [Eligible Customer] (the “Agreement”) \nThe undersigned, an authorized officer of [Eligible Customer], certifies on behalf of Eligible \nCustomer, as of the date of this certification, as follows: \n1. The retail Large Load Customer is [name], and the Large Load Facility is [identify facility]. \n2. The retail security arrangement is [identify agreement, security type, provider or issuer, \ninstrument number if applicable, and effective and expiration dates]. \n3. The amount of retail security currently available to Eligible Customer and available for the \nwholesale obligations under the Agreement is $[●]. \n4. Eligible Customer has enforceable draw or application rights, or the benefit of a binding \nundertaking, that permit it to use the retail-security proceeds to satisfy the corresponding \nwholesale obligations under the Agreement. \n5. The certified amount has not been counted for another inconsistent obligation and has not \nbeen reduced, drawn, expired, cancelled, or otherwise impaired except as disclosed here: [●]. \n6. The retail security arrangement has the following renewal, expiration, and notice terms: [●]. \nEligible Customer will deliver an updated Retail Security Certification to LS Power Grid \nwithin three (3) Business Days after any reduction, draw, expiration, nonrenewal, \ntermination, amendment, loss of enforceable draw or application rights, or other event that \ncould impair the certified support. \n7. The statements in this certification are true and complete in all material respects as of the \ndate of this certification. Eligible Customer understands that LS Power Grid is entitled to rely \non this continuing certification without reviewing the underlying retail-security documents in \nthe ordinary course, subject to LS Power Grid’s rights under Article 7 and Schedule 3. No \nannual renewal or recertification is required unless an updated Retail Security Certification is \nrequired under Item 6. \nThis Retail Security Certification is continuing and shall remain effective unless and until \nsuperseded, withdrawn, or deemed ineffective under the Agreement. \nELIGIBLE CUSTOMER \nBy: ________________________________ \nName: ______________________________ \nTitle: _______________________________ \nDate: _______________________________"},{"page":121,"startToken":47545,"endToken":47833,"text":"Schedule 4 - 1 \n \nSchedule 4 \nCAISO Regional Project Allocation and Responsibility \nThis Schedule shall identify each CAISO-Assigned Regional Project associated with the Large \nLoad Facility. If no CAISO-Assigned Regional Project has been identified as of the Effective \nDate, this Schedule shall state “None identified as of [date]” and shall be updated promptly after \nCAISO formally assigns a specific project share to the Large Load Facility. The assigned share, \nownership, expected and actual Regional Project In-Service Date, any Commission-authorized \nabandoned-plant incentive and its applicable order, any pre-service payment or security required \nby the CAISO Tariff or another Commission-accepted arrangement, billing path, applicable \noperational security, and credits or true-ups shall be documented below. The Schedule shall not \nbe read to impose pre-service Construction Security under this Agreement unless separately \nrequired by the applicable tariff or Commission-accepted arrangement. \nRequired project information \nProject-specific entry \nCAISO project name and identification number \n[to be completed] \nProject owner and other responsible entities \n[to be completed] \nCAISO Tariff provision, order, study, or formal \ndetermination establishing the specific assignment \n[to be completed] \nDate the assignment is made and its effective date \n[to be completed] \nLarge Load Facility to which the specific share is \nassigned \n[to be completed] \nAssigned share: percentage, dollar amount, or other \nCAISO-approved measure \n[to be completed] \nAllocation basis and calculation, including any share \nassigned to other beneficiaries \n[to be completed] \nProject ownership and whether costs are included in \nLS Power Grid’s Formula Rate \n[to be completed] \nExpected and actual project in-service date \n[to be completed] \nEstimated Annual MTRC and, once established, \nFinal Annual MTRC for the project share (the \nRegional Project Allocated ARR), together with the \nprojected Total Required Revenue Commitment, if \nLS Power Grid-owned and included in its Formula \nRate \n[to be completed]"},{"page":122,"startToken":47833,"endToken":48063,"text":"Schedule 4 - 2 \n \nRequired project information \nProject-specific entry \nBilling entity, payment method, applicable tariff or \nproject-owner arrangement, and invoicing schedule \n[to be completed] \nConstruction and operational security required, \nsecurity provider, amount, effective date, and \ndeadline \n[to be completed] \nTreatment of TAC revenues, direct payments, credits, \nrefunds, and true-ups to prevent duplicate recovery \n[to be completed] \nDeadline for Eligible Customer to provide executed \narrangement or compliance evidence \n[to be completed] \nMethod and timing for any prospective assignment \nchange authorized by the CAISO Tariff or \nCommission-accepted methodology \n[to be completed] \nCommission order and status authorizing abandoned-\nplant incentive for the project, including applicable \nproject scope and recovery terms\n[to be completed] \nPre-service cancellation or abandonment cost \ntreatment under the CAISO Tariff, Commission \norder, or approved project arrangement; any \ncustomer contribution or security required and \napplicable credits\n[to be completed] \nFor a CAISO-Assigned Regional Project owned by another entity, this Schedule records the \nEligible Customer’s separate obligation under the CAISO Tariff or project-owner arrangement. \nThat obligation is not included in any Annual MTRC, Regional Project Allocated ARR, Total \nRequired Revenue Commitment, Cumulative Revenue Responsibility, or TRBAA Credit unless \nthe costs are included in LS Power Grid’s Formula Rate and the specific share is expressly \nidentified as LS Power Grid’s responsibility. Any applicable CAISO Tariff credit or project-\nowner credit shall be applied to prevent recovery of the same assigned share more than once."},{"page":123,"startToken":48063,"endToken":48443,"text":"Schedule 5 - 1 \n \nSchedule 5 \nMTRC Calculation Template and Cumulative Revenue Ledger \nThis Schedule contains the project-specific calculation of each Estimated Annual MTRC and \nFinal Annual MTRC and the Cumulative Revenue Ledger. LS Power Grid shall calculate each \nAnnual MTRC solely under this Schedule. The Final Annual MTRC shall equal the applicable \nfinal incurred capital cost multiplied by the Project-Specific Levelized Fixed Charge Rate \ncalculated in this Schedule. The calculation shall identify the applicable capital-cost input, \npresent-worth tax-depreciation benefits, Formula Rate inputs, fixed expense allocator, applicable \nallocation percentage, Annual MTRC, Total Required Revenue Commitment, Remaining \nCumulative Revenue Responsibility, and supporting inputs.  \nFor purposes of calculating present-worth federal and state income-tax depreciation benefits, the \nSchedule applies a levelized-depreciation rate of five percent (5%) of the applicable capital cost \ninput in each year of the twenty (20)-year MTRC Term. This levelized-depreciation schedule is \nnot a separate annual charge. The Schedule is fixed on the Final MTRC Determination Date \nexcept to correct an error or fraud, to implement an effective prospective reassignment, to \nimplement a final FERC order applicable to the calculation, to implement a Dispute \nDetermination under Section 11.5, or to reflect, prospectively, a change in (i) LS Power Grid’s \nreturn on equity component of its Formula Rate, resulting from a final FERC order accepting or \napproving such change, or (ii) applicable federal or state tax rates or tax law enacted after the \nFinal MTRC Determination Date; provided that, the five percent (5%) annual levelized-\ndepreciation schedule shall remain fixed for the MTRC Term unless a final FERC order requires \notherwise. \nThe following project-specific calculation and ledger shall be completed for each Covered \nUpgrade. LS Power Grid shall include an updated ledger statement in each Reconciliation \nStatement served on Eligible Customer under Sections 6.6 and 6.7; this Schedule does not \nimpose a separate FERC filing requirement. \nAnnual Ledger Service. LS Power Grid shall update the Cumulative Revenue Ledger at least \nannually in connection with its Annual Update and shall include the resulting statement and the \nsupporting workpapers in each Reconciliation Statement served on Eligible Customer. The \nstatement is an agreement-administration record and is not required to be filed with FERC unless \nFERC otherwise requires. Any dispute concerning the statement shall be resolved under Article \n11 of the Agreement."},{"page":124,"startToken":48443,"endToken":48449,"text":"Schedule 5 - 2 \n \nInputs and Security"},{"page":125,"startToken":48449,"endToken":48458,"text":"Schedule 5 - 3 \n \nQualifying Revenue and Cumulative Revenue Ledger"},{"page":126,"startToken":48458,"endToken":48466,"text":"Schedule 5 - 4 \n \nPresent Worth and Annualization Calculation"},{"page":127,"startToken":48466,"endToken":48474,"text":"Schedule 5 - 5 \n \nExpense and Capital Structure Inputs"},{"page":128,"startToken":48474,"endToken":48480,"text":"Schedule 5 - 6 \n \nTwenty-Year Depreciation Schedule"},{"page":129,"startToken":48480,"endToken":48487,"text":"i \nAppendix VI  LARGE LOAD INTERCONNECTION PROCEDURES"},{"page":130,"startToken":48487,"endToken":48786,"text":"ii \n \nTABLE OF CONTENTS  \n \n Page No. \nSection 1.  Objectives and Applicability .................................................................1 \n \n1.1 Objectives……………………………………………………………….1 \n \n \n1.2 Applicability……………………………………………………………. 1 \n \nSection 2. \nDefinitions ...............................................................................................1 \n \n \nSection 3. \nGeneral Provisions Applicable to All Interconnection Requests.....6  \n \n \n \n3.1 Interconnection Requests ......................................................................6 \n \n3.2 Transmission Interconnection Service .................................................6 \n \n3.2.1 \nThe Product .............................................................................6 \n \n3.2.2 \nNo Applicability to Transmission Service.............................7 \n \n \n3.2.3 \nRoles and Responsibilities ......................................................7 \n \n3.3 Comparability ........................................................................................7 \n \n3.4 Base Case Data .......................................................................................8 \n \n3.5 Coordination with Affected Systems ....................................................8 \n \n3.6  Capacity of the Large Load ..................................................................8 \n \n \n3.7  Proposed Service Commencement Date ..............................................9 \n \n \n3.7.1 \nInterconnection Request .........................................................9 \n \n \n3.7.2 \nAfter Start of the Large Load Interconnection Study .........9 \n3.8 Queue Position ...........................................................................................10 \n3.9 Withdrawal .............................................................................................10 \n \n3.10 Withdrawal Penalty ................................................................................11 \n        3.10.1  Calculation of the Withdrawal Penalty.....................................11 \n3.11 Standards for Co-located Inverter Based Generating Facilities ........12 \n \n \nSection 4. Large Load Study Process ........................................................................12 \n \n4.1 Timing for Submitting Interconnection Requests ..............................12 \n \n \n4.2 Processing of Interconnection Request ................................................12 \n \n4.2.1 \nInitiating an Interconnection Request ..................................13 \n \n4.2.1.1 Use of Interconnection Study Deposit ................................13 \n \n \n \n4.3 Validation of Interconnection Request ................................................14 \n \n4.3.1 \nAcknowledgment of Interconnection Request......................14 \n \n4.3.2 \nDeficiencies in Interconnection Request ...............................14 \n \n4.4   Potential Deferral of the Interconnection Studies ................................15 \n4.5 Scoping Meeting .....................................................................................15 \n \n4.6 Interconnection Studies .........................................................................16 \n \n4.6.1 \nLarge Load Interconnection Study .......................................17 \n \n4.6.1.1  Scope of the Large Load Interconnection Study .................17 \n \n4.6.1.2  Timing of the Large Load Interconnection Study Results .18 \n \n4.6.1.3   Large Load Interconnection Study Report Meeting .........19 \n \n4.6.1.4 Increase in the Commercial Readiness Deposit ...................19 \n4.6.1.5  Restudy....................................................................................20 \n4.6.1.6  Modifications ..........................................................................20"},{"page":131,"startToken":48786,"endToken":48999,"text":"iii \n \n4.6.2     Optional Flexible Interim Load Interconnection (FILI) Study and \nAgreement ...............................................................................................21 \n4.6.3     Additional Studies .....................................................................23 \n \n4.6.4     Financing of Participating TO’s Interconnection Facilities and Large \nLoad Network Upgrades .......................................................................24 \n4.7 Interconnection Financial Security ......................................................24 \n \n4.7.1 \nTypes of Interconnection Financial Security ........................24 \n \n \n \nSection 5. \nLarge Load Interconnection Agreement .............................................25 \n \n5.1 Tender.....................................................................................................25 \n5.2   Negotiation ...............................................................................................25 \n \n5.3 Execution and Filing ..............................................................................26 \n5.4   Commencement of Interconnection Activities .....................................27 \n \n \nSection 6. \nConstruction of Participating TO’s Interconnection Facilities \n \n and Large Load Network Upgrades ....................................................27 \n \n6.1 Schedule..................................................................................................27 \n6.2 Construction Sequencing.......................................................................27 \n \n6.2.1 \nGeneral .....................................................................................27 \n \n6.2.2 \nAdvancing Construction of  \nLarge Load Network Upgrades that are Part of an Expansion Plan of the \nParticipating TO ....................................................................................27 \n \n6.3 Special Provisions for Affected Systems ..............................................28 \n \n \nSection 7. \nMiscellaneous..........................................................................................28 \n \n7.1 Confidentiality ........................................................................................28 \n \n7.1.1 \nScope.........................................................................................28 \n \n7.1.2 \nRelease of Confidential Information .....................................29 \n \n7.1.3 \nRights .......................................................................................29 \n \n7.1.4 \nNo Warranties .........................................................................29 \n \n7.1.5 \nStandard of Care .....................................................................30 \n \n7.1.6 \nOrder of Disclosure .................................................................30 \n \n7.1.7 \nRemedies ..................................................................................30 \n \n7.1.8 \nDisclosure to FERC, its Staff, or a State ...............................30 \n \n7.2 Disputes ................................................................................................31 \n7.2.1 \nSubmission ...............................................................................31 \n \n \nAttachment 1 – Interconnection Request Form"},{"page":132,"startToken":48999,"endToken":49409,"text":"1 \n \n \n \n LARGE LOAD INTERCONNECTION PROCEDURES (LLIP) \n \n \nSection 1. \nObjectives and Applicability  \n1.1 Objectives \n \nThe objective of this LLIP is to implement requirements for Large Load interconnections to the \nParticipating TO’s Transmission System pursuant to the TO Tariff.  For purposes of this LLIP, \nthe “Participating TO” is LS Power Grid California, LLC (“LS Power Grid”), and the “TO \nTariff” is the LS Power Grid California, LLC Transmission Owner Tariff.  Because LS Power \nGrid is a Non-Load-Serving Participating TO and has no End-Use Customers, a Large Load \ninterconnecting under this LLIP will not be a retail transmission customer of the Participating \nTO.   \n \n1.2 Applicability  \n \nThe LLIP is applicable to a Large Load Interconnection Customer that is either (1) proposing to \ninterconnect a Large Load to the Participating TO’s Transmission System; (2) seeking to \nincrease the capacity of an existing Large Load processed under the LLIP; or (3) with respect to \nan existing load interconnected to the Participating TO’s Transmission System that was not \nprocessed under the LLIP, seeking an increase of 50 MW or greater.  This LLIP only applies to \ncompleted Interconnection Requests submitted after the effective date of this Appendix VI to the \nTO Tariff.  Consistent with Section 10A of the TO Tariff, all requests for ECLL Interconnection \nshall be directed to the Participating TO.  An Interconnection Request submitted under this LLIP \nshall constitute the ECLL Interconnection Application, and the Interconnection Studies and the \nLarge Load Interconnection Agreement under this LLIP shall constitute the study process and \nthe ECLL Interconnection Agreement, respectively, for purposes of Section 10A of the TO \nTariff.  \n \n \nSection 2. \nDefinitions  \n \nTerms used in this LLIP with initial capitalization shall have the meanings set forth below.  The \nsingular of any definition shall include the plural and the plural shall include the singular.  If a \nterm with initial capitalization used herein is not defined, such term shall have the meanings \nascribed to such term in Section 3 of the TO Tariff.   \n \n \nAffected System shall mean an electric system other than the Participating TO’s \nTransmission System that may be affected by the proposed interconnection.   \n \n \nAffected System Operator shall mean the entity that owns or operates an Affected System, \nand includes an Affected System Owner as defined in any Cost Recovery Agreement.   \n \n \n \n \nApplicable Laws and Regulations shall mean all duly promulgated applicable federal, state \nand local laws, regulations, rules, ordinances, codes, decrees, judgments, directives, or judicial or \nadministrative orders, permits and other duly authorized actions of any Governmental Authority."},{"page":133,"startToken":49409,"endToken":49848,"text":"2 \n \n \n  \nBase Case shall mean data including, but not limited to, base power flow, short circuit and \nstability data bases, underlying load, generation, and transmission facility assumptions, \ncontingency lists, including relevant remedial action schemes, and transmission diagrams used to \nperform the Interconnection Studies.  The Base Case may include Critical Energy Infrastructure \nInformation (as that term is defined by FERC).  The Base Case may include transmission \nfacilities as approved by the Participating TO or ISO, as applicable, Reliability Network \nUpgrades that are included in a signed interconnection agreement, Large Load Network \nUpgrades, Large Loads and any co-located generation, and load forecast. The Base Case may \nalso include generation facilities that (i) are directly interconnected to a Distribution System or \nthe ISO Controlled Grid; (ii) are interconnected to Affected Systems and may have an impact on \nthe Interconnection Request; (iii) have a pending request to interconnect to a Distribution System \nor an Affected System; or (iv) are not interconnected to a Distribution System or the ISO \nControlled Grid, but are subject to the terms and conditions of a fully executed interconnection \nagreement (or its equivalent predecessor agreement) or for which an unexecuted interconnection \nagreement (or its equivalent predecessor agreement) has been requested to be filed with FERC.   \n \n \nBusiness Day shall mean Monday through Friday, excluding Federal Holidays. \n \n \nCalendar Day shall mean any day including Saturday, Sunday or a Federal Holiday.   \n \nCommercial Readiness Deposit shall mean a deposit paid as set forth in LLIP Sections \n4.2.1 and 4.6.1.4. \n \n \nConfidential Information shall mean any confidential, proprietary or trade secret \ninformation of a plan, specification, pattern, procedure, design, device, list, concept, policy or \ncompilation relating to the present or planned business of a Party, which is designated as \nconfidential by the Party supplying the information, whether conveyed orally, electronically, in \nwriting, through inspection, or otherwise. \n \n \nCost Recovery Agreement shall have the meaning set forth in Section 3 of the TO Tariff. \n \n \nDispute Resolution shall mean the applicable procedure for resolution of a dispute between \nthe Parties as described in Section 14 of the TO Tariff, including, as applicable, the ISO ADR \nProcedures.  \n \n \nFlexible Interim Load Interconnection (FILI) Service shall have the meaning set forth in \nSection 3 of the TO Tariff. \n \n \nFILI Study shall mean the study performed by the Participating TO pursuant to LLIP \nSection 4.6.2 to determine the availability of Interim Firm Interconnection Service and FILI \nService. \n \n \nInterconnection Financial Security shall mean any of the financial instruments listed in \nLLIP Section 4.7.1 provided by the Large Load Interconnection Customer to comply with its \nobligations under the LLIP or the Large Load Interconnection Agreement."},{"page":134,"startToken":49848,"endToken":50284,"text":"3 \n \n \n \nInterconnection Request shall mean a request, in the form of Attachment 1 to Appendix VI \nto the TO Tariff, to interconnect a new Large Load, or to increase the capacity of, or make a \nMaterial Modification to the operating characteristics of, an existing Large Load that is \ninterconnected with the Participating TO’s Transmission System. \n \n \nInterconnection Study shall mean any of the following studies: the Large Load \nInterconnection Study, the FILI Study, restudies, and any additional studies performed pursuant \nto LLIP Section 4.6.3. \n \n \nInterconnection Study Deposit shall mean the cash deposit provided to the Participating \nTO under LLIP Section 4.2.1 as a requirement of a valid Interconnection Request to be used to \noffset the cost of the Interconnection Studies. \n \nLarge Load Capacity shall mean the maximum capacity of the Large Load at the Point of \nInterconnection.  \n \nLarge Load Customer shall mean the End-User that owns, operates, or proposes to develop \nthe Large Load and receives, or will receive, retail transmission service from the Large Load \nInterconnection Customer, and shall be the Large Load Customer for purposes of the TO Tariff \nand any Cost Recovery Agreement. \n \nLarge Load Interconnection Agreement shall mean the interconnection agreement \nbetween the Participating TO and the Large Load Interconnection Customer, developed by the \nParticipating TO consistent with the TO Tariff and the results of the Interconnection Studies and \nnegotiated between the Parties pursuant to LLIP Section 5, which sets forth the terms and \nconditions governing the interconnection of the Large Load to the Participating TO’s \nTransmission System, including, without limitation, cost responsibility, payment provisions, cost \nrecovery, and financial security for the Participating TO’s Interconnection Facilities and Large \nLoad Network Upgrades, as it may be amended from time to time. The Large Load \nInterconnection Agreement shall constitute the ECLL Interconnection Agreement for purposes of \nthe TO Tariff, as applicable, and shall be filed with FERC by the Participating TO to the extent \nrequired. For purposes of the TO Tariff, the Participating TO’s Interconnection Facilities and \nLarge Load Network Upgrades identified in the Large Load Interconnection Agreement shall \ntogether constitute the ECLL Interconnection Facilities. \n \nLarge Load Interconnection Customer shall mean an Eligible Customer for Large Load \n(“ECLL”), as defined in Section 3 of the TO Tariff, that proposes to interconnect its facilities \nwith the Participating TO’s Transmission System for the purpose of providing retail transmission \nservice to a Large Load. \n \nLarge Load Interconnection Customer Interconnection Facilities shall mean all facilities \nand equipment owned, controlled, or operated by the Large Load Interconnection Customer or \nthe Large Load Customer up to the Point of Change of Ownership as identified in the Large"},{"page":135,"startToken":50284,"endToken":50744,"text":"4 \n \nLoad Interconnection Agreement, including any modifications, additions or upgrades to such \nfacilities and equipment.   \n \n \nLarge Load Interconnection Procedures (LLIP) shall mean the interconnection \nprocedures applicable to an Interconnection Request set forth in this Appendix VI to the TO \nTariff. \n \nLarge Load Interconnection Study shall mean an engineering study conducted by the \nParticipating TO for a Large Load Interconnection Customer under the LLIP that evaluates the \nimpact of the proposed interconnection on the safety and reliability of Participating TO’s \nTransmission System and, if applicable, an Affected System. The Large Load Interconnection \nStudy will also determine a list of facilities (including Participating TO’s Interconnection \nFacilities and Large Load Network Upgrades), the cost of those facilities, and the time required \nto interconnect the Large Load with the Participating TO’s Transmission System. The scope of \nthe study is defined in LLIP Section 4.6.1.1. \n \nLarge Load Network Upgrades shall mean the additions, modifications, and upgrades to \nthe ISO Controlled Grid at or beyond the Point of Interconnection necessary to serve one or more \nLarge Loads safely and reliably that are identified through the Large Load Interconnection Study \nand submitted to the ISO for concurrence pursuant to Section 25.7 of the ISO Tariff. Large Load \nNetwork Upgrades do not include Participating TO’s Interconnection Facilities. To the extent a \nLarge Load Network Upgrade is owned or to be constructed by the Participating TO and is \nidentified in Schedule 1 to a Cost Recovery Agreement, such Large Load Network Upgrades \nshall constitute Large Load-Driven Upgrades, as defined in that Cost Recovery Agreement.  \n \nLarge Load Study Process Agreement shall mean the agreement, developed and tendered \nby the Participating TO pursuant to LLIP Section 4.5, entered into by the Large Load \nInterconnection Customer and the Participating TO which sets forth the Parties’ agreement to \nperform Interconnection Studies under the LLIP. \n \n \nMaterial Modification shall mean those modifications that have a material impact on the \ncost or timing of any Interconnection Request, or any other valid interconnection request to the \nParticipating TO or the ISO, with an equal or later Queue Position date.  \n \n \n \nParticipating TO’s Interconnection Facilities shall mean all facilities and equipment \nowned, controlled, or operated by the Participating TO from the Point of Change of Ownership \nto the Point of Interconnection as identified in the Large Load Interconnection Agreement, \nincluding any modifications, additions or upgrades to such facilities and equipment.  \nParticipating TO’s Interconnection Facilities are transmission facilities but are not controlled by \nthe ISO.  Participating TO’s Interconnection Facilities are sole use facilities and shall not include \nLarge Load Network Upgrades.  \n \nParticipating TO’s Transmission System shall mean the facilities owned and operated by \nthe Participating TO and that have been placed under the ISO’s Operational Control, which \nfacilities form part of the ISO Controlled Grid."},{"page":136,"startToken":50744,"endToken":51203,"text":"5 \n \nPoint of Change of Ownership shall mean the point, as set forth in the Large Load \nInterconnection Agreement, where the Large Load Interconnection Customer's interconnection \nfacilities connect to the Participating TO’s Interconnection Facilities. \n \n \nPoint of Interconnection shall mean the point, as set forth in the Large Load \nInterconnection Agreement, where the Participating TO’s Interconnection Facilities connect to \nthe Participating TO’s Transmission System.  For purposes of the TO Tariff, the Point of \nInterconnection shall be the Point of Withdrawal for the Large Load. \n \n  \nQueue Position shall mean the order of a valid Interconnection Request, relative to all other \npending valid Interconnection Requests, established pursuant to LLIP Section 3.8. \n \n \nReasonable Efforts shall mean, with respect to an action required to be attempted or taken \nby a Party under the LLIP or the Large Load Interconnection Agreement, efforts that are timely \nand consistent with Good Utility Practice and are otherwise substantially equivalent to those a \nParty would use to protect its own interests. \n \nReport Meeting shall mean the meeting among the Participating TO, the Large Load \nInterconnection Customer, and if applicable, the ISO and other Affected System Operators to \ndiscuss the results of the Interconnection Studies as set forth in the LLIP.  \n \nScoping Meeting shall mean the meeting between representatives of the Large Load \nInterconnection Customer and Participating TO, and if applicable, the ISO, conducted for the \npurpose of discussing alternative interconnection options, to exchange information including any \ntransmission data and earlier study evaluations that would be reasonably expected to impact such \ninterconnection options, to analyze such information, and to determine the potential feasible \nPoints of Interconnection.  \n \nService Commencement Date shall mean the date the Large Load is initially operated in \nparallel with the Participating TO’s Transmission System and transmission interconnection \nservice is provided to the Large Load Interconnection Customer pursuant to the terms of an \nexecuted Large Load Interconnection Agreement. For purposes of any Cost Recovery \nAgreement, the Service Commencement Date shall be the Large Load Service Commencement \nDate specified in Schedule 1 to that agreement.  \n \nSite Control shall have the meaning set forth in Section 3 of the TO Tariff. \n \nSystem Protection Facilities shall mean the equipment, including necessary protection \nsignal communications equipment, that protects (1) the Participating TO’s Transmission System, \nParticipating TO’s Interconnection Facilities, ISO Controlled Grid, and Affected Systems from \nfaults or other electrical disturbances occurring at the Large Load and (2) the Large Load from \nfaults or other electrical system disturbances occurring on the ISO Controlled Grid, Participating \nTO’s Interconnection Facilities, and Affected Systems or on other delivery systems or other \ngenerating systems to which the ISO Controlled Grid is directly connected. \n \nTransmission Interconnection Service shall mean the service provided by the Participating \nTO associated with interconnecting the Large Load to the Participating TO’s Transmission"},{"page":137,"startToken":51203,"endToken":51638,"text":"6 \n \nSystem and enabling the Large Load Interconnection Customer to receive electric energy at the \nPoint of Interconnection, pursuant to the terms of the Large Load Interconnection Agreement and \nthe TO Tariff. \n \nWithdrawal Penalty shall mean the penalty assessed by Participating TO to a Large Load \nInterconnection Customer that chooses to withdraw or is deemed withdrawn from Participating \nTO’s interconnection queue or whose Large Load does not otherwise reach its Service \nCommencement Date. The calculation of the Withdrawal Penalty is set forth in LLIP Section \n3.10.1. \n \nSection 3. \nGeneral Provisions Applicable to All Interconnection Requests \n \n \n3.1 \nInterconnection Requests \nA Large Load Interconnection Customer shall submit to Participating TO an \nInterconnection Request in the form of Attachment 1 to this LLIP for processing \nunder the LLIP.  Consistent with Section 10A.2.1 of the TO Tariff, the Large \nLoad Interconnection Customer shall send a copy of the Interconnection Request \nto the ISO, and the Interconnection Request and all supporting documentation \nshall be submitted electronically to the Participating TO in the manner posted on \nthe Participating TO’s public website.   \n \nAn Interconnection Request for the expansion of capacity of an existing Large \nLoad shall be treated the same as an Interconnection Request for a new Large \nLoad pursuant to this LLIP.  \n \nCo-located generation serving a Large Load that will not export to the ISO \nControlled Grid shall be interconnected in accordance with the generator \ninterconnection rules of the applicable ECLL, as approved by its Local \nRegulatory Authority (including, for a UDC subject to the jurisdiction of the \nCPUC, CPUC Electric Rule 21), consistent with Section 10A.5 of the TO Tariff; \nprovided that, where such co-located generation is included in the Interconnection \nRequest, the Participating TO will evaluate its incremental impacts on the \nParticipating TO’s Transmission System as part of the LLIP study process. Co-\nlocated generation that will export to the ISO Controlled Grid is required to \nsubmit a generator interconnection request to the ISO in accordance with Section \n25.7.6 of the ISO Tariff for evaluation of the proposed generator interconnection \nand the Large Load will be evaluated pursuant to the LLIP.  For a Large Load co-\nlocated with an exporting generating facility, the ISO will be a party to a pro \nforma agreement that bridges the generator’s Large Generator Interconnection \nAgreement with the Large Load Interconnection Agreement, or will negotiate a \nnon-conforming Large Generator Interconnection Agreement, consistent with \nSection 10A.5 of the TO Tariff. \n \n3.2 \nTransmission Interconnection Service \n \n3.2.1 The Product.  Transmission Interconnection Service allows Large Load \nInterconnection Customer to connect the Large Load to the Participating"},{"page":138,"startToken":51638,"endToken":51986,"text":"7 \n \nTO’s Transmission System and be eligible to receive electric energy and \ncapacity from the ISO Controlled Grid. \n \n3.2.2 No Applicability to Transmission Service.  Nothing in this LLIP shall \nconstitute a request for transmission service or confer upon a Large Load \nInterconnection Customer any right to receive transmission service.   \n \n3.2.3 Roles and Responsibilities. \n \n3.2.3.1 Each Interconnection Request will be subject to the direction and \noversight of the Participating TO.  The Participating TO will \nconduct or cause to be performed the required Interconnection \nStudies and any additional studies the Participating TO determines \nto be reasonably necessary.  The analysis of impacts on, and \nupgrades required to, the Participating TO’s Transmission System \nwill be performed by the Participating TO and will be subject to \nreview and concurrence by the ISO.  The Participating TO will \nperform all required studies related to the Participating TO’s \nTransmission System and will coordinate with Affected System \nOperators in accordance with LLIP Section 3.5. \n \n3.2.3.2 The Participating TO will complete or cause to be completed all \nstudies as required within the timelines provided in this LLIP. \n \n \n3.2.3.3 Each Large Load Interconnection Customer shall pay the actual \ncosts of all Interconnection Studies, and any additional studies the \nParticipating TO determines to be reasonably necessary in \nresponse to the Interconnection Request.  The Participating TO \nshall reimburse the ISO for the actual cost of any portion of the \nInterconnection Studies that the ISO performs related to the ISO \nControlled Grid, as applicable.  \n \n \n3.2.3.3.1 The Participating TO shall issue invoices for \nInterconnection Studies that shall include a detailed and \nitemized accounting of the cost of each Interconnection \nStudy.  Whenever the actual cost of performing the \nInterconnection Studies exceeds the Interconnection \nStudy Deposit, the Large Load Interconnection Customer \nshall pay the undisputed difference in accordance with the \nParticipating TO issued invoice within thirty (30) \nCalendar Days.  The Participating TO shall not be \nobligated to continue to have any studies conducted \nunless the Large Load Interconnection Customer has paid \nall undisputed amounts in compliance herewith."},{"page":139,"startToken":51986,"endToken":52416,"text":"8 \n \n3.3 \nComparability \nParticipating TO shall receive, process and analyze all Interconnection Requests \nin a timely manner as set forth in this LLIP.  Participating TO will use the same \nReasonable Efforts in processing and analyzing Interconnection Requests from all \nLarge Load Interconnection Customers, whether the Large Load is owned by \nParticipating TO and its Affiliates or by a third party.   \n \n3.4 \nBase Case Data \nParticipating TO shall provide Base Case data to a Large Load Interconnection \nCustomer upon request subject to confidentiality provisions in LLIP Section 7.1. \nParticipating TO shall provide base power flow, short circuit databases, including \nall underlying assumptions, and contingency list used in the Large Load \nInterconnection Customer’s Interconnection Studies.  Participating TO is \npermitted to require that the Large Load Interconnection Customer sign a \nconfidentiality agreement before the release of commercially sensitive \ninformation or Critical Energy Infrastructure Information in the Base Case data.  \nSuch Base Cases may include all (i) Large Loads, (ii) generation projects, and (iii) \ntransmission projects, including merchant transmission projects that are proposed \nfor the Participating TO’s Transmission System for which a transmission \nexpansion plan has been submitted and approved by the applicable authority. \n \n \n3.5 \nCoordination with Affected Systems \nThe Participating TO will notify the Affected System Operators that are \npotentially affected by a Large Load Interconnection Customer’s Interconnection \nRequest.  The Participating TO will coordinate the conduct of any studies \nrequired to determine the impact of the Interconnection Request on Affected \nSystems with Affected System Operators and, if possible, include those results (if \navailable) in its applicable Interconnection Study within the time frame specified \nin this LLIP.  Participating TO will include such Affected System Operators in all \nmeetings held with Large Load Interconnection Customer as required by this \nLLIP.  Large Load Interconnection Customer will cooperate with Participating \nTO in all matters related to the conduct of studies and the determination of \nmodifications to Affected Systems.  If an Affected System Operator, that has been \ninformed its system is an Affected System refuses to cooperate with the \nParticipating TO with whom interconnection has been requested in all matters \nrelated to the conduct of studies and the determination of whether modifications \nto its Affected System are necessary to avoid adverse impacts, it waives any right \nin any fora that the Participating TO’s provision of service has adversely impacted \nsuch Affected System Operator. \n \n3.6 \nCapacity of the Large Load  \n \nThe Interconnection Request shall be evaluated using the maximum capacity \nrequested by the Large Load Interconnection Customer.  However, if the \nmaximum capacity that the Large Load is capable of receiving is greater than the"},{"page":140,"startToken":52416,"endToken":52861,"text":"9 \n \nmaximum capacity requested by the Large Load Interconnection Customer, the \nLarge Load Interconnection Customer will be required to limit the Large Load \ncapacity to no greater than the amount requested (e.g., through use of a control \nsystem, power relay(s), or other similar device settings or adjustments), and the \nLarge Load Interconnection Customer must obtain the Participating TO’s \nagreement, with such agreement not to be unreasonably withheld, that the manner \nin which the Large Load Interconnection Customer proposes to implement such a \nlimit will not adversely affect the safety and reliability of the Participating TO’s \nTransmission System.  If the Participating TO does not so agree, then the \nInterconnection Request must be withdrawn or revised to specify the maximum \ncapacity that the Large Load is capable of receiving.    Furthermore, nothing in \nthis section shall prevent a Participating TO from considering a capacity higher \nthan the limited capacity, if appropriate, when evaluating system protection \nimpacts. \n \n3.7 \nProposed Service Commencement Date \nThe  proposed Service Commencement Date of the new Large Load or increase in \ncapacity of the existing Large Load shall not exceed seven years from the date the \nInterconnection Request is received by Participating TO for those Interconnection \nRequests studied in accordance with the Large Load Interconnection Procedures, \nunless Large Load Interconnection Customer demonstrates and the Participating \nTO agrees, such agreement not to be unreasonably withheld, that engineering, \npermitting and construction of the new Large Load or increase in capacity of the \nexisting Large Load will take longer than the seven-year period.    \n \n3.7.1 Interconnection Request.  If the proposed Service Commencement Date in \nthe Interconnection Request is more than seven years from the date the \nInterconnection Request is received by the Participating TO, the Large Load \nInterconnection Customer must demonstrate, subject to the Participating TO’s \nagreement, such agreement not to be unreasonably withheld, that the required \nengineering, permitting and construction of the Large Load will take longer than \nthe seven-year period.  \n \n3.7.2 After Start of the Large Load Interconnection Study.  Any request to \nextend the Service Commencement Date after commencement of the Large Load \nInterconnection Study under the LLIP, or following execution of a Large Load \nInterconnection Agreement, shall be subject to the following: \n \n(i) Requested extension does not exceed seven years from Service \nCommencement Date in the original Interconnection Request.  A request \nto extend the Service Commencement Date that does not exceed seven \nyears from the Service Commencement Date in the original \nInterconnection Request is subject to the modification assessment process \nspecified in LLIP Section 4.6.1.6.1.  \n \n(ii) Requested extension exceeds seven years from Service Commencement \nDate in the original Interconnection Request.  A request to extend the"},{"page":141,"startToken":52861,"endToken":53285,"text":"10 \n \nService Commencement Date that exceeds seven years from the Service \nCommencement Date in the original Interconnection Request shall (a) \ndemonstrate, subject to the Participating TO’s agreement, such agreement \nnot to be unreasonably withheld, that engineering, permitting and \nconstruction of the new Large Load or increase in capacity of the existing \nLarge Load will take longer than the seven-year period, and (b) be subject \nto the modification assessment process specified in LLIP Section \n4.6.1.6.1. \n \nAny extension of the Service Commencement Date under this LLIP Section 3.7.2 \nshall not extend the Outside Date under any applicable Cost Recovery Agreement \nunless the parties to that agreement agree in writing to such extension. \n \n3.8   Queue Position \n \n           3.8.1 Assignment of Queue Position. \nParticipating TO shall assign a Queue Position as follows: the Queue \nPosition shall be assigned based upon the date and time of receipt of all \nitems required pursuant to the provisions of LLIP Section 4.2.1.   \n \n3.8.2 Higher Queue Position.  \nA higher Queue Position assigned to an Interconnection Request is one \nthat has been placed “earlier” in the queue in relation to another \nInterconnection Request that is assigned a lower Queue Position.  \n \n \n3.9 \nWithdrawal \nLarge Load Interconnection Customer may withdraw its Interconnection Request \nat any time by written notice of such withdrawal to Participating TO, and the \nParticipating TO will notify the ISO and Affected System Operators, if any, \nwithin three (3) Business Days of receipt of such a notice.  In addition, after \nconfirmation by the Participating TO of a valid Interconnection Request, if the \nLarge Load Interconnection Customer fails to adhere to all requirements of this \nLLIP, except as provided in LLIP Section 7.2 (Disputes), Participating TO shall \ndeem the Interconnection Request to be withdrawn and shall provide written \nnotice to Large Load Interconnection Customer of the deemed withdrawal within \nfive (5) Business Days and an explanation of the reasons for such deemed \nwithdrawal.  Upon receipt of such written notice, Large Load Interconnection \nCustomer shall have five (5) Business Days in which to either (i) respond with \ninformation or action that cures the deficiency, or (ii) support its position that the \ndeemed withdrawal was erroneous and notify the Participating TO of its intent to \npursue Dispute Resolution. \n \nFor an Interconnection Request under the LLIP, withdrawal shall result in the \nremoval of the Interconnection Request from the Interconnection Studies.  If a \nLarge Load Interconnection Customer disputes the withdrawal and removal from \nthe Interconnection Studies and has elected to pursue Dispute Resolution, Large"},{"page":142,"startToken":53285,"endToken":53679,"text":"11 \n \nLoad Interconnection Customer's Interconnection Request will not be considered \nin any ongoing Interconnection Study during the Dispute Resolution process. \n \nIn the event of such withdrawal, Participating TO, subject to the provisions in \nLLIP Section 7.1, as applicable, shall provide, at Large Load Interconnection \nCustomer's request, all information that Participating TO developed for any \ncompleted study conducted up to the date of withdrawal of the Interconnection \nRequest. \n \n3.10 \nWithdrawal Penalty \n \nA Large Load Interconnection Customer with an Interconnection Request being \nprocessed under the LLIP will be subject to a Withdrawal Penalty if it withdraws \nits Interconnection Request or is deemed withdrawn, or the Large Load does not \notherwise achieve its Service Commencement Date, which date may be modified \nif the necessary Participating TO-owned facilities cannot be constructed on a \ntimeline that meets such date, unless: (1) the withdrawal does not have a material \nimpact on the cost or timing of any equal or later queued interconnection request; \n(2) Large Load Interconnection Customer withdraws after receiving Large Load \nInterconnection Customer’s most recent Interconnection Study report and the \nLarge Load Network Upgrade costs assigned to the Interconnection Request \nidentified in that report have increased by more than twenty-five percent (25%) \ncompared to costs identified in Large Load Interconnection Customer’s preceding \nInterconnection Study report; or (3) Large Load Interconnection Customer \nwithdraws after receiving an Interconnection Study report issued after completion \nof the initial Large Load Interconnection Study and the Large Load Network \nUpgrade costs assigned to the Interconnection Request identified in such \nInterconnection Study report have increased by more than one hundred percent \n(100%) compared to costs identified in the initial Large Load Interconnection \nStudy report. \n \n3.10.1 Calculation of the Withdrawal Penalty \n \nIf the Large Load Interconnection Customer withdraws its Interconnection \nRequest or is deemed withdrawn prior to the commencement of the Large \nLoad Interconnection Study, Large Load Interconnection Customer will \nnot be subject to a Withdrawal Penalty.  If Large Load Interconnection \nCustomer withdraws, is deemed withdrawn, or otherwise does not achieve \nits Service Commencement Date at any point after the commencement of \nthe Large Load Interconnection Study, that Large Load Interconnection \nCustomer’s Withdrawal Penalty will be the greater of: (1) the Large Load \nInterconnection Customer’s Interconnection Study Deposit required under \nLLIP Section 4.2.1; or (2) as follows in (a)–(c): \n \n(a) If Large Load Interconnection Customer withdraws or is deemed"},{"page":143,"startToken":53679,"endToken":54051,"text":"12 \n \nwithdrawn during the Large Load Interconnection Study or after \nreceipt of a Large Load Interconnection Study report, Large Load \nInterconnection Customer will be charged two (2) times the actual cost \nof the Large Load Interconnection Study performed for the Large Load \nInterconnection Customer. \n \n(b) If Large Load Interconnection Customer withdraws or is deemed \nwithdrawn after receipt of the draft Large Load Interconnection \nAgreement but before Large Load Interconnection Customer has \nexecuted a Large Load Interconnection Agreement or has requested \nthat its Large Load Interconnection Agreement be filed unexecuted, \nLarge Load Interconnection Customer will be charged ten percent \n(10%) of its estimated Large Load Network Upgrade costs as reflected \nin the most recently completed Interconnection Study.   \n \n(c) If Large Load Interconnection Customer has executed a Large \nLoad Interconnection Agreement or has requested that its Large Load \nInterconnection Agreement be filed unexecuted and subsequently \nwithdraws its Interconnection Request, the Large Load Interconnection \nCustomer’s Withdrawal Penalty will be calculated as set forth in the \nLarge Load Interconnection Agreement.   \n \nThe Commercial Readiness Deposit shall be retained as financial security \nfor the Withdrawal Penalty (if applicable) and, other than as set forth in \nthe Large Load Interconnection Agreement, any security not applied to the \nWithdrawal Penalty will be released to the Large Load Interconnection \nCustomer following withdrawal or the Service Commencement Date.  \nWhere a Cost Recovery Agreement applies, (i) any Commercial Readiness \nDeposit or Interconnection Financial Security provided for the same costs \nshall count toward, and shall not be duplicated by, the Construction \nSecurity required under the Cost Recovery Agreement, and (ii) any \nWithdrawal Penalty paid with respect to a Large Load Network Upgrade \nshall be credited against the Pre-In-Service Termination Costs payable \nunder the Cost Recovery Agreement for that upgrade, so that the \nParticipating TO does not recover the same costs more than once. \n \n3.11 \nStandards for Co-located Inverter Based Generating Facilities \n \nInverters used for the production, and/or later injection from storage, of electricity \nshall meet the inverter certification standards of UL-1741 and UL-1741 \nSupplement B. \n \nSection 4.  Large Load Study Process \n \n4.1 \nTiming For Submitting Interconnection Requests \nA Large Load Interconnection Customer may submit an Interconnection Request \nfor processing under the LLIP at any time during the year. The Participating TO,"},{"page":144,"startToken":54051,"endToken":54452,"text":"13 \n \nin coordination with the ISO, as applicable, will study the Interconnection \nRequest.   \n \n4.2 \nProcessing of Interconnection Request \n \n4.2.1 \nInitiating an Interconnection Request.  To initiate an \nInterconnection Request under the LLIP, Large Load Interconnection \nCustomer must submit all of the following: (i) an Interconnection Study \nDeposit of $250,000; (ii) a completed Interconnection Request in the form \nof Attachment 1 to the LLIP, including preferred Point of Interconnection \nand voltage level, all information required by Section 10A.2.1 of the TO \nTariff (other than any election of interim service, which shall be made in \naccordance with LLIP Section 4.6.2), and all other technical data; (iii) a \nCommercial Readiness Deposit equal to two times the Interconnection \nStudy Deposit described in this LLIP Section 4.2.1 in the form of an \nirrevocable letter of credit, cash, a surety bond, or other form of security \nthat is reasonably acceptable to Participating TO, in accordance with LLIP \nSection 4.7.1. This Commercial Readiness Deposit is refunded to Large \nLoad Interconnection Customer according to LLIP Section 3.10.1; \nhowever, the Participating TO shall be entitled to hold the Commercial \nReadiness Deposit until the Large Load Interconnection Customer’s Large \nLoad achieves its Service Commencement Date; and (iv) demonstration of \nSite Control.   \n \n4.2.1.1 Use of Interconnection Study Deposit.  The Interconnection \nStudy Deposit shall be applied to pay for prudent costs incurred by \nthe Participating TO, the ISO, or third parties at the direction of the \nParticipating TO or ISO, as applicable, to perform and administer \nthe Interconnection Studies.   \n \nIn the event a Large Load Interconnection Customer withdraws its \nInterconnection Request prior to the commencement of the Large \nLoad Interconnection Study, Large Load Interconnection Customer \nmust pay Participating TO the actual costs of processing its \nInterconnection Request. In the event a Large Load \nInterconnection Customer withdraws after commencement of the \nLarge Load Interconnection Study, Participating TO shall charge \nand Large Load Interconnection Customer shall pay the actual \ncosts of the Interconnection Studies.  \n \nAny difference between the Interconnection Study Deposit and the \nactual cost of the Interconnection Studies shall be paid by or \nrefunded to the Large Load Interconnection Customer. Any \ninvoices for Interconnection Studies shall include a detailed and \nitemized accounting of the cost of each Interconnection Study. \nLarge Load Interconnection Customers shall pay any such \nundisputed costs within thirty (30) Calendar Days of receipt of an"},{"page":145,"startToken":54452,"endToken":54875,"text":"14 \n \ninvoice. If Large Load Interconnection Customer fails to pay such \nundisputed costs within the time allotted, its Interconnection \nRequest shall be deemed withdrawn and will be subject to a \nWithdrawal Penalty pursuant to LLIP Section 3.10.1. \n \nThe Participating TO will reimburse the ISO or third parties, as \napplicable, for all work performed on behalf of the withdrawn \nInterconnection Request at the Participating TO’s direction. The \nLarge Load Interconnection Customer must pay all monies due \nbefore it is allowed to obtain any Interconnection Study data or \nresults. \n \n \n4.3 \nValidation of Interconnection Request \n \n4.3.1 Acknowledgment of Interconnection Request.  Participating TO shall \nnotify the Large Load Interconnection Customer within ten (10) Business \nDays of receipt of the Interconnection Request, which notice shall state \nwhether the Interconnection Request is deemed valid.   \n \n4.3.2 Deficiencies in Interconnection Request.  An Interconnection Request \nwill not be considered to be a valid request until all items in LLIP Section \n4.2.1 have been received by Participating TO and deemed valid by the \nParticipating TO.  If an Interconnection Request fails to meet the \nrequirements set forth in LLIP Section 4.2.1, Participating TO shall \ninclude in its notification to the Large Load Interconnection Customer \nunder LLIP Section 4.3.1 the reasons for such failure and that the \nInterconnection Request does not constitute a valid request.  Consistent \nwith Section 10A.2.3 of the TO Tariff, the Participating TO will attempt to \nremedy deficiencies in the Interconnection Request through informal \ncommunications with the Large Load Interconnection Customer, and the \nLarge Load Interconnection Customer shall provide Participating TO the \nadditional requested information needed to constitute a valid request.  \nWhenever the additional requested information is provided by the Large \nLoad Interconnection Customer, the Participating TO shall notify the \nLarge Load Interconnection Customer within five (5) Business Days of \nreceipt of the additional requested information whether the \nInterconnection Request is valid.  If the Interconnection Request continues \nto fail to meet the requirements set forth in LLIP Section 4.2.1, the \nParticipating TO shall include in its notification to the Large Load \nInterconnection Customer the reasons for such failure.  If an \nInterconnection Request has not been deemed valid, the Large Load \nInterconnection Customer must submit all information necessary to meet \nthe requirements of LLIP Section 4.2.1 no later than twenty (20) Business \nDays after the date the original Interconnection Request was submitted, or \nten (10) Business Days after the Participating TO first provided notice that \nthe Interconnection Request was not valid, whichever is later."},{"page":146,"startToken":54875,"endToken":55282,"text":"15 \n \nInterconnection Requests that have not met the requirements of LLIP \nSection 4.2.1 within twenty (20) Business Days after the date the original \nInterconnection Request was submitted or ten (10) Business Days after the \nParticipating TO first provided notice that the Interconnection Request \nwas not valid, whichever is later, will be deemed invalid, will be returned \nto the Large Load Interconnection Customer in accordance with Section \n10A.2.3 of the TO Tariff, and will not be included in the LLIP.  \n \nInterconnection Requests deemed invalid under this LLIP Section 4.3.2 \nare not subject to LLIP Section 3.9.  Large Load Interconnection \nCustomers with invalid Interconnection Requests under this LLIP Section \n4.3.2 may seek relief under LLIP Section 7.2 by so notifying the \nParticipating TO within two (2) Business Days of the notice of invalidity. \n \n4.4     Potential Deferral of the Interconnection Studies \n \n           The Participating TO may defer commencement of the Large Load \nInterconnection Study when it determines, using Good Utility Practice and \nreasonable engineering judgment, that the Interconnection Request cannot be \nstudied meaningfully until other pending study results for higher-queued projects \nare available. \n \n           Within ten (10) Business Days after deeming an Interconnection Request valid \nunder LLIP Section 4.3.1, the Participating TO will notify the Large Load \nInterconnection Customer in writing if it is deferring the start of the \nInterconnection Studies. The notice will include: (i) information regarding the \npending studies; and (ii) the estimated start date of the Large Load \nInterconnection Study.  During the period of deferral, the Participating TO will \nprovide a monthly status update to the Large Load Interconnection Customer. \n \n \n4.5 \nScoping Meeting \nWithin fifteen (15) Business Days after the Participating TO notifies the Large \nLoad Interconnection Customer that the Interconnection Request has been \ndeemed valid as set forth in LLIP Section 4.3.2, the Participating TO shall \nestablish a date agreeable to the Large Load Interconnection Customer, and the \nISO, if applicable, for the Scoping Meeting.   \n \nThe purpose of the Scoping Meeting shall be to discuss reasonable Service \nCommencement Dates and alternative interconnection options, to exchange \ninformation including any transmission data that would reasonably be expected to \nimpact such interconnection options, to analyze such information and to \ndetermine the potential feasible Points of Interconnection and eliminate \nalternatives given resources and available information. The Scoping Meeting shall \nalso include discussion of a deferral of the Interconnection Studies in accordance \nwith LLIP Section 4.4."},{"page":147,"startToken":55282,"endToken":55744,"text":"16 \n \nThe Participating TO will bring to the meeting, as reasonably necessary to \naccomplish its purpose, such already available technical data, including, but not \nlimited to, (i) general facility loadings, (ii) general instability issues, (iii) general \nshort circuit issues, (iv) general voltage issues, and (v) general reliability issues.    \n \nThe Large Load Interconnection Customer will bring to the Scoping Meeting, in \naddition to the technical data form (Appendix A to Attachment 1) submitted with \nits Interconnection Request, any system studies previously performed.  The \nParticipating TO, the ISO, if applicable, and the Large Load Interconnection \nCustomer will also bring to the meeting personnel and other resources as may be \nreasonably required to accomplish the purpose of the meeting in the time \nallocated for the meeting.  On the basis of the meeting, the Large Load \nInterconnection Customer shall designate its Point of Interconnection.  The \nduration of the meeting shall be sufficient to accomplish its purpose. \n \nWithin five (5) Business Days after the Scoping Meeting, the Participating TO  \nshall tender to the Large Load Interconnection Customer a Large Load Study \nProcess Agreement developed by the Participating TO consistent with the TO \nTariff and this LLIP, which shall contain an outline of the scope of the Large \nLoad Interconnection Study, contain a non-binding good faith estimate of the cost \nto perform such study, and shall specify that the Large Load Interconnection \nCustomer is responsible for the actual cost of the Interconnection Studies, \nincluding reasonable administrative costs.  No later than thirty (30) Calendar Days \nafter the Scoping Meeting, the Large Load Interconnection Customer shall either \nexecute and deliver to the Participating TO  the Large Load Study Process \nAgreement or request that the Participating TO file it unexecuted with FERC, or \nthe Interconnection Request shall be deemed withdrawn.  If an unexecuted filing \nis requested, the Interconnection Studies will be paused until the Large Load \nStudy Process Agreement is made effective by FERC. \n \n4.6 \nInterconnection Studies \nThe Interconnection Studies shall consist of a Large Load Interconnection Study, \nany FILI Study requested pursuant to LLIP Section 4.6.2, and any additional \nstudies, including but not limited to those identified in LLIP Section 4.6.3 \nrequired for interconnection of the Large Load, and co-located generation not \nexporting to the ISO Controlled Grid, to the Participating TO’s Transmission \nSystem.    The analysis of impacts on, and upgrades required to, the Participating \nTO’s Transmission System will be performed by the Participating TO and will be \nsubject to the review and concurrence of the ISO in accordance with Section 25.7 \nof the ISO Tariff. The Interconnection Studies will identify Participating TO’s \nInterconnection Facilities and required Large Load Network Upgrades necessary \nto mitigate thermal overloads and voltage violations, and address short circuit, \nstability, and reliability issues associated with the requested Transmission \nInterconnection Service."},{"page":148,"startToken":55744,"endToken":56117,"text":"17 \n \nAll cost estimates for Participating TO’s Interconnection Facilities and Large \nLoad Network Upgrades, as applicable, contained in the Interconnection Studies \nwill be set forth in the Interconnection Study report in present dollar costs as well \nas time-adjusted dollar costs, adjusted to the estimated year of construction of the \ncomponents being constructed.   \n \nThe Participating TO will prepare an Interconnection Study report to document \nthe results of the Interconnection Studies.   \n \n4.6.1 Large Load Interconnection Study.  \n \n \n4.6.1.1  Scope of the Large Load Interconnection Study.  The Large \nLoad Interconnection Study will consist of a  short circuit analysis, \na power flow analysis, an electromagnetic transient (“EMT”) \nscreening, a non-binding good faith estimate of the scope and cost \nof the Participating TO’s Interconnection Facilities and Large Load \nNetwork Upgrades, and any other studies that are deemed \nnecessary. The Large Load Interconnection Study will also identify \nthe need for any additional studies (e.g., stability analysis, EMT \nstudy, etc.) to be performed as part of the scope of work set forth in \nthe Large Load Interconnection Agreement pursuant to LLIP \nSection 4.6.3.  When there is co-located generation not exporting \nto the ISO Controlled Grid and not subject to electrical short \ncircuit duty dependence, the Large Load Interconnection Study \nwill identify the impacts associated with the Large Load and any \nincremental impacts of the co-located generation.       \nThe Large Load Interconnection Study will consider the use of \nalternative transmission technologies including dynamic line \nratings, advanced power flow control devices, advanced \nconductors, and transmission switching, when evaluating \ntransmission solutions to accommodate new Large Loads and their \nassociated transmission system impacts.  If traditional network \nupgrades are selected instead of alternative transmission \ntechnologies, the Participating TO will provide a demonstration of \nwhy alternative transmission technologies are not feasible or would \nnot result in lower costs or a faster timeline for accommodating the \ninterconnection of the Large Load.  \nThe Large Load Interconnection Study shall state the assumptions \nupon which it is based, state the results of the analyses, and \nprovide the requirement or potential impediments to providing the \nrequested Transmission Interconnection Service, including an \nestimate of the cost and length of time that would be necessary to \ncorrect any problems identified in those analyses and implement \nthe Interconnection."},{"page":149,"startToken":56117,"endToken":56485,"text":"18 \n \nThe Large Load Interconnection Study shall provide a list of \nParticipating TO’s Interconnection Facilities and Large Load \nNetwork Upgrades, as applicable, that are required as a result of \nthe Interconnection Request. \n \n4.6.1.2 Timing of the Large Load Interconnection Study Results.  The \nParticipating TO shall use Reasonable Efforts to complete the \nLarge Load Interconnection Study within ninety (90) Calendar \nDays after the execution of a Large Load Study Process Agreement \nor, if the Large Load Study Process Agreement is filed unexecuted, \nafter it is made effective by FERC.  The Participating TO will \nissue a Large Load Interconnection Study report to the Large Load \nInterconnection Customer. The Participating TO will share study \nresults with the ISO for review and concurrence.   \n \nAt any time the Participating TO determines that it will not meet \nthe required time frame for completing the Large Load \nInterconnection  Study, Participating TO shall notify the Large \nLoad Interconnection Customer as to the schedule status of the \nLarge Load Interconnection Study and provide an estimated \ncompletion date with an explanation of the reasons why additional \ntime is required. \n \nUpon request, the Participating TO shall provide the Large Load \nInterconnection Customer all supporting documentation, \nworkpapers and relevant pre-Interconnection Request and post-\nInterconnection Request power flow and short circuit databases for \nthe Large Load Interconnection Study, subject to confidentiality \narrangements consistent with LLIP Section 7.1. \n \nShould the Large Load Interconnection Customer provide written \ncomments on the Large Load Interconnection Study report at least \nfive (5) Business Days before the Report Meeting conducted to \ndiscuss the report, the Participating TO will address the written \ncomments in the Large Load Interconnection Study Report \nMeeting.  Should the Large Load Interconnection Customer \nprovide comments at any later time (up to the time of the Report \nMeeting), then such comments shall be considered informal \ninquiries to which the Participating TO will provide informal, \ninformational responses at the Report Meeting, to the extent \npossible.  \n \nThe Large Load Interconnection Customer may submit, in writing, \nadditional comments on the final Large Load Interconnection \nStudy report up to three (3) Business Days following the Report \nMeeting.  Based on any discussion at the Report Meeting and any \ncomments received from the Large Load Interconnection Customer"},{"page":150,"startToken":56485,"endToken":56827,"text":"19 \n \nor the ISO, the Participating TO will determine whether it is \nnecessary to follow the Large Load Interconnection Study report \nwith a revised study report.  The Participating TO will issue any \nsuch revised report to the Large Load Interconnection Customer no \nlater than fifteen (15) Business Days following the Report \nMeeting. If the ISO has not completed its review of the Large Load \nInterconnection Study report, the Participating TO shall delay its \ndetermination of whether a revised study report is required until \nthat review is complete. \n \n \n \n \n \n \n4.6.1.3 Large Load Interconnection Study Report Meeting.  A Report \nMeeting shall be held among the Participating TO, the ISO, if \napplicable, and the Large Load Interconnection Customer to \ndiscuss the results of the Large Load Interconnection Study, \nincluding assigned cost responsibility.  Any such Report Meeting \nwill be held within ten (10) Business Days of the date the Large \nLoad Interconnection Study report is provided to the Large Load \nInterconnection Customer.  \n \n4.6.1.4 Commercial Readiness Deposit.  Within thirty (30) Calendar \nDays after receiving the final Large Load Interconnection Study \nreport, the Large Load Interconnection Customer shall provide an \nadditional Commercial Readiness Deposit sufficient to bring the \naggregate Commercial Readiness Deposit to twenty percent (20%) \nof the Participating TO’s then-current estimated construction cost \nof the Large Load Network Upgrades identified in that report that \nare attributable to the Interconnection Request.  If the final Large \nLoad Interconnection Study report is revised following ISO \nreview, the required Commercial Readiness Deposit shall be \nadjusted to reflect twenty percent (20%) of the corresponding \nestimated construction cost identified in the revised final report, \nand any required increase shall be provided within thirty (30) \nCalendar Days after issuance of that report.  \n \n \nThe Commercial Readiness Deposit secures the Withdrawal \nPenalty and other pre-in-service obligations under this LLIP and \nthe Large Load Interconnection Agreement. It does not establish a \ndirect assignment of the Large Load Network Upgrade costs, \nconstitute a payment toward an Annual MTRC, reduce the Total \nRequired Revenue Commitment, or satisfy Operational Security \nunder a Cost Recovery Agreement."},{"page":151,"startToken":56827,"endToken":57213,"text":"20 \n \nTo the extent a Commercial Readiness Deposit is in a form \npermitted under Schedule 3 of an applicable Cost Recovery \nAgreement, LS Power Grid may elect in writing to credit it dollar-\nfor-dollar toward required Construction Security under that \nagreement. No amount of Commercial Readiness Deposit may be \napplied or credited more than once. Any portion not so credited \nshall be administered and released under Sections 3.9 and 3.10 of \nthis LLIP and the Large Load Interconnection Agreement. \n   \n4.6.1.5 Restudy. If restudy of the Large Load Interconnection Study is \nrequired due to a higher queued project dropping out of the queue, \nor a modification of a higher queued project subject to LLIP \nSection 4.6.1.6, Participating TO shall notify Large Load \nInterconnection Customer in writing. Such restudy shall take no \nlonger than forty-five (45) Calendar Days from the date of notice. \nAny cost of restudy shall be borne by the Large Load \nInterconnection Customer. \n \n4.6.1.6 Modifications.  At any time during the course of the \nInterconnection Studies, the Large Load Interconnection Customer, \nthe Participating TO, or the ISO, as applicable, may identify \nchanges to the planned interconnection that may improve the costs \nand benefits (including reliability) of the interconnection, and the \nability of the proposed change to accommodate the Interconnection \nRequest.  To the extent the identified changes are acceptable to the \nParticipating TO, the ISO, as applicable, and Large Load \nInterconnection Customer, such acceptance not to be unreasonably \nwithheld, Participating TO shall modify the configuration in \naccordance with such changes without altering the Interconnection \nRequest’s eligibility for participating in Interconnection Studies.          \n \n4.6.1.6.1 For any modifications other than those agreed upon under \nLLIP Section 4.6.1.6, the Large Load Interconnection \nCustomer must first request that Participating TO evaluate \nwhether such modification is a Material Modification.  In \nresponse to Large Load Interconnection Customer's \nrequest, Participating TO, in coordination with the ISO, if \napplicable, shall evaluate the proposed modifications prior \nto making them and inform Large Load Interconnection \nCustomer in writing of whether the modifications would \nconstitute a Material Modification.  The Participating TO \nmay, at its option, engage the services of the ISO to assist \nin the assessment of the modification.  Any change to the \nPoint of Interconnection shall constitute a Material \nModification."},{"page":152,"startToken":57213,"endToken":57544,"text":"21 \n \n \nThe Large Load Interconnection Customer shall provide \nthe Participating TO a $30,000 deposit for the modification \nassessment at the time the request is submitted.  Except as \nprovided below, any modification assessment will be \nconcluded, and a response provided to the Large Load \nInterconnection Customer in writing, within forty-five (45) \nCalendar Days from the date the Participating TO receives \nall of the following: 1) the Large Load Interconnection \nCustomer’s written notice to modify the project; 2) a \nnarrative description of the requested modification; 3) \ntechnical data required to assess the request, including an \nupdated technical data form (Appendix A to Attachment 1 \nto this LLIP), if requested by the Participating TO; 4) any \nadditional information requested by Participating TO; and \n5) payment of the $30,000 deposit.  If applicable, the \nParticipating TO shall coordinate the modification request \nwith the ISO.  If the modification assessment cannot be \ncompleted within that time period, the Participating TO \nshall notify the Large Load Interconnection Customer and \nprovide an estimated completion date with an explanation \nof the reasons why additional time is required.  The Large \nLoad Interconnection Customer will be responsible for the \nactual costs incurred by the Participating TO and, if \napplicable, the ISO in conducting the modification \nassessment.  If the actual costs of the modification \nassessment are less than the deposit provided by the Large \nLoad Interconnection Customer, the Large Load \nInterconnection Customer will be refunded the balance \nwithin thirty (30) Calendar Days of being invoiced.  If the \nactual costs of the modification assessment are greater than \nthe deposit provided by the Large Load Interconnection \nCustomer, the Large Load Interconnection Customer shall \npay the balance within thirty (30) Calendar Days of being \ninvoiced. \n \nIf the proposed modification is determined to be a Material \nModification by the Participating TO pursuant to the \nmodification assessment described above, the Large Load \nInterconnection Customer shall then either:  \n \n(i) \nwithdraw the proposed modification, or  \n \n(ii) withdraw the proposed modification and submit a \nnew Interconnection Request reflecting such \nmodification."},{"page":153,"startToken":57544,"endToken":58004,"text":"22 \n \n4.6.2   Optional Flexible Interim Load Interconnection (FILI) Study and \nAgreement. If the Large Load Interconnection Study finds that the full \namount of the Interconnection Request cannot be accommodated prior to \nthe time that all ECLL Interconnection Facilities are in service, the Large \nLoad Interconnection Customer may request a FILI Study, by written \nnotice to the Participating TO within thirty (30) Calendar Days after \nreceipt of the final Large Load Interconnection Study report, to \ndetermine, consistent with Section 10A.4 of the TO Tariff, whether \nInterim Firm Interconnection Service and/or FILI Service may be \nprovided.  A Large Load Interconnection Customer may elect to be \nstudied only for Interim Firm Interconnection Service and not FILI \nService.  If the Large Load Interconnection Customer elects to proceed \nwith a FILI Study, the Participating TO shall use Reasonable Efforts to \ncomplete the FILI Study within sixty (60) Calendar Days after receipt of \nsuch request. Large Load Interconnection Customer will be responsible \nfor the actual costs of the FILI Study. The Participating TO will perform \nthe FILI Study. At any time the Participating TO determines that it will \nnot meet the required time frame for completing the FILI Study, \nParticipating TO shall notify the Large Load Interconnection Customer as \nto the schedule status of the FILI Study and provide an estimated \ncompletion date with an explanation of the reasons why additional time is \nrequired. \n \n \n \n The FILI Study will determine (i) the maximum amount of Interim Firm \nInterconnection Service, if any, that can be provided prior to completion \nof the Participating TO’s Interconnection Facilities and Large Load \nNetwork Upgrades; (ii) whether the Large Load Interconnection \nCustomer is eligible to receive FILI Service and the maximum amount of \nsuch service; (iii) the conditions and limitations of such service; (iv) the \nupgrades and the associated cost; and (v) the estimated duration required \nto provide the interim service. The Participating TO will share study \nresults with the ISO for review and concurrence.  The Participating TO \nshall update its analysis of the availability of FILI Service at least \nannually under the terms of the FILI Service Agreement, and the actual \namount of FILI Service available during any operating period shall be \ndetermined by the Participating TO through operational assessments \nconducted closer to real-time operating conditions, consistent with \nSection 10A.4 of the TO Tariff.  If requested by the Large Load \nInterconnection Customer within ten (10) Business Days of the date of \nthe issuance of the FILI Study report, a Report Meeting shall be \nscheduled among the Participating TO, the ISO, and the Large Load \nInterconnection Customer. \n \n \n \nThe Large Load Interconnection Customer should note the following \nconsiderations: \na) \nTemporary limits may be adjusted if unforeseen conditions arise. \nb) \nAdvance notice of non-firm load curtailment may not be possible."},{"page":154,"startToken":58004,"endToken":58439,"text":"23 \n \nc) \nNon-firm load may be curtailed during planned or repair outages, \nwhich may last longer than 6 months. \nd) \nISO may have additional operational requirements. \ne) \nParticipating TO is not obligated to provide flexibility beyond \nwhat it can, in its sole judgment, manage operationally. \nf) \nParticipating TO’s Interconnection Facilities costs for interim \ninterconnection service will be directly assigned to the Large Load \nInterconnection Customer. \ng) \nLarge Load Interconnection Customers not adhering to the \ncontractual agreement and conditions may be curtailed indefinitely.  \n \n4.6.2.1 FILI Service Agreement. If the Large Load Interconnection \nCustomer has elected FILI Service, as reflected in the Large Load \nInterconnection Agreement, the Large Load Interconnection \nCustomer shall ensure that, prior to the Service Commencement \nDate, the Large Load Customer executes, or requests to be filed \nunexecuted with FERC, a FILI Service Agreement with the \nParticipating TO and, as applicable, the ISO, developed by the \nParticipating TO consistent with Section 10A.4 of the TO Tariff \nand in accordance with ISO Tariff Section 25.7.2. The FILI \nService Agreement shall describe the circumstances in which the \nISO or Participating TO may temporarily curtail the Large Load \nreceiving FILI Service, and the mechanism the ISO or \nParticipating TO will use to perform the curtailment. The ISO will \npost such FILI Service Agreements on the ISO Website.  \n \n4.6.3   Additional Studies. The Participating TO may identify the need for \nadditional studies to comply with Applicable Reliability Standards. These \nadditional studies may include, but are not limited to, the following: \nstability analysis, variable load impact analysis, and EMT analysis.  The \nassociated new scope will be identified in the Large Load Interconnection \nStudy pursuant to LLIP Section 4.6.1.1. The additional studies will be \nperformed by the Participating TO as part of the scope of work set forth in \nthe Large Load Interconnection Agreement. The additional studies may \nresult in the identification of additional facilities scope and cost, and may \nrequire a revision to the schedule set forth in the Large Load \nInterconnection Agreement. The Large Load Interconnection Customer \nwill be responsible for providing the necessary technical information \nand/or models requested by the Participating TO to conduct the additional \nstudies. The Large Load Interconnection Customer will be responsible for \nthe costs of such studies.            \n \nIf an additional study results in the need to revise the scope of work of the \nLarge Load Network Upgrades identified in the Large Load \nInterconnection Study and the updated assigned costs have increased by \nmore than twenty-five percent (25%) compared to costs identified in the \nLarge Load Interconnection Study report, the Large Load Interconnection"},{"page":155,"startToken":58439,"endToken":58824,"text":"24 \n \nCustomer shall not be subject to a Withdrawal Penalty under LLIP Section \n3.10.1 if the Interconnection Request is withdrawn within thirty (30) \nCalendar Days of receipt of the additional study report.  If the Large Load \nInterconnection Customer elects to continue with its Interconnection \nRequest, the Large Load Interconnection Agreement will be amended to \nreflect the results of the additional study. \n \n4.6.4   Financing of Participating TO’s Interconnection Facilities and Large \nLoad Network Upgrades.  The responsibility to finance Participating \nTO’s Interconnection Facilities shall be assigned solely to the Large Load \nInterconnection Customer. The Participating TO will be responsible for \nfinancing Large Load Network Upgrades in accordance with the Large \nLoad Interconnection Agreement and, as to any Large Load Network \nUpgrades that constitute Large Load-Driven Upgrades, the Cost Recovery \nAgreement required under LLIP Section 5.3.   \n \n4.7 \nInterconnection Financial Security   \n \n4.7.1 Types of Interconnection Financial Security.  The Interconnection \nFinancial Security posted by a Large Load Interconnection Customer may \nbe any combination of the following types of Interconnection Financial \nSecurity provided in favor of the Participating TO: \n \n(a) \nan irrevocable and unconditional letter of credit issued by a bank \nor financial institution that has a credit rating of A or better by \nStandard and Poor’s or A2 or better by Moody’s;  \n \n(b) \nan irrevocable and unconditional surety bond issued by an \ninsurance company that has a credit rating of A or better by \nStandard and Poor’s or A2 or better by Moody’s; \n \n(c) \nan unconditional and irrevocable guaranty issued by a company \nthat has a credit rating of A or better by Standard and Poor’s or A2 \nor better by Moody’s; \n \n(d) \na cash deposit standing to the credit of the Participating TO and in \nan interest-bearing escrow account maintained at a bank or \nfinancial institution that is reasonably acceptable to the \nParticipating TO; \n \n(e) \na certificate of deposit in the name of the Participating TO issued \nby a bank or financial institution that has a credit rating of A or \nbetter by Standard and Poor’s or A2 or better by Moody’s; or  \n \n(f) \na payment bond certificate in the name of the Participating TO \nissued by a bank or financial institution that has a credit rating of A \nor better by Standard and Poor’s or A2 or better by Moody’s."},{"page":156,"startToken":58824,"endToken":59247,"text":"25 \n \n \nInterconnection Financial Security instruments as listed above shall be in \nsuch form as the Participating TO may reasonably require from time to \ntime by notice to Large Load Interconnection Customers, or in such other \nform as has been evaluated and approved as reasonably acceptable by the \nParticipating TO.     \n \nThe Participating TO shall require the use of standardized forms of \nInterconnection Financial Security to the greatest extent possible.  If at any \ntime the guarantor of the Interconnection Financial Security fails to \nmaintain the credit rating required by this LLIP Section 4.7.1, the Large \nLoad Interconnection Customer shall provide to the Participating TO \nreplacement Interconnection Financial Security meeting the requirements \nof this LLIP Section 4.7.1 within five (5) Business Days of the change in \ncredit rating.  \n \nInterest on a cash deposit standing to the credit of the Participating TO in \nan interest-bearing escrow account under subpart (d) of this LLIP Section \n4.7.1 will accrue to the Large Load Interconnection Customer’s benefit.  \n \nExecution and filing of the Large Load Interconnection Agreement at \nFERC are addressed in LLIP Section 5. \n \nSection 5. \nLarge Load Interconnection Agreement  \n \n5.1 \nTender.  Within thirty (30) Calendar Days after the Report Meeting for the final Large \nLoad Interconnection Study report or, if the Large Load Interconnection \nCustomer has timely requested a FILI Study pursuant to LLIP Section 4.6.2, \nwithin thirty (30) Calendar Days after issuance of the final FILI Study report (or, \nif a Report Meeting is requested for the FILI Study, after such Report Meeting), \nthe Participating TO shall tender to the Large Load Interconnection Customer a \ndraft Large Load Interconnection Agreement developed by the Participating TO \nconsistent with the TO Tariff, this LLIP, and the results of the Interconnection \nStudies.  The draft Large Load Interconnection Agreement shall address, without \nlimitation, the scope, schedule, cost responsibility, payment provisions, cost \nrecovery, and financial security for the Participating TO’s Interconnection \nFacilities and Large Load Network Upgrades, and any applicable operating \nrequirements.  The Large Load Interconnection Customer shall provide written \ncomments, or notification of no comments, on the draft Large Load \nInterconnection Agreement within thirty (30) Calendar Days. \n \n5.2 \nNegotiation.  Notwithstanding LLIP Section 5.1, at the request of Large Load \nInterconnection Customer, Participating TO shall begin negotiations with Large \nLoad Interconnection Customer concerning the terms and conditions of the Large \nLoad Interconnection Agreement at any time after the Participating TO provides \nthe Large Load Interconnection Customer with the final Large Load \nInterconnection Study report, or the final FILI Study report, if applicable."},{"page":157,"startToken":59247,"endToken":59760,"text":"26 \n \nParticipating TO and Large Load Interconnection Customer shall negotiate in \ngood faith concerning any disputed provisions of the draft Large Load \nInterconnection Agreement for not more than sixty (60) Calendar Days after the \nParticipating TO provides the Large Load Interconnection Customer with the final \nLarge Load Interconnection Study report or the final FILI Study report if \napplicable.  If Large Load Interconnection Customer determines that negotiations \nare at an impasse, it may request termination of the negotiations at any time after \ntender of the draft Large Load Interconnection Agreement pursuant to LLIP \nSection 5.1 and request submission of the unexecuted Large Load Interconnection \nAgreement with FERC or initiate Dispute Resolution procedures pursuant to LLIP \nSection 7.2.  If Large Load Interconnection Customer requests termination of the \nnegotiations, but within sixty (60) Calendar Days after issuance of the final Large \nLoad Interconnection Study report, or the final FILI Study report if applicable, \nfails to request either the filing of the unexecuted Large Load Interconnection \nAgreement or initiate Dispute Resolution, it shall be deemed to have withdrawn \nits Interconnection Request.  Unless otherwise agreed by the Parties, if Large \nLoad Interconnection Customer has not executed the Large Load Interconnection \nAgreement, requested filing of an unexecuted Large Load Interconnection \nAgreement, or initiated Dispute Resolution procedures pursuant to LLIP Section \n7.2 within the time period set forth in LLIP Section 5.3, it shall be deemed to have \nwithdrawn its Interconnection Request.  Participating TO shall provide to Large \nLoad Interconnection Customer a final Large Load Interconnection Agreement \nwithin fifteen (15) Business Days after the completion of the negotiation process. \n \n \nThe Participating TO may declare an impasse upon sixty (60) Calendar Days after \nissuance of the final Large Load Interconnection Study report, or the final FILI \nStudy report if applicable, or at any time following sixty (60) Calendar Days after \nissuance of the final Large Load Interconnection Study report, or the final FILI \nStudy report if applicable, if the Parties have agreed to extend negotiation of the \nLarge Load Interconnection Agreement.  If the Participating TO declares an \nimpasse, the Participating TO will file the Large Load Interconnection Agreement \nunexecuted with FERC within twenty-one (21) Calendar Days. \n \n5.3 \nExecution and Filing \nWithin thirty (30) Business Days after receipt of the final Large Load \nInterconnection Agreement, Large Load Interconnection Customer shall either: (i) \nexecute the final Large Load Interconnection Agreement and return it to \nParticipating TO; or (ii) request in writing that Participating TO file with FERC \nthe Large Load Interconnection Agreement in unexecuted form, or its \nInterconnection Request shall be deemed withdrawn and subject to LLIP Section \n3.10.  To the extent FERC filing is required, as soon as practicable, but not later \nthan ten (10) Business Days after receiving either the executed Large Load \nInterconnection Agreement or the request to file an unexecuted Large Load \nInterconnection Agreement, Participating TO shall file the Large Load \nInterconnection Agreement with FERC, together with, in the case of an \nunexecuted Large Load Interconnection Agreement, its explanation of any matters \nas to which Large Load Interconnection Customer and Participating TO disagree"},{"page":158,"startToken":59760,"endToken":60159,"text":"27 \n \nand support for the costs that Participating TO proposes to charge to Large Load \nInterconnection Customer under the Large Load Interconnection Agreement.  An \nunexecuted Large Load Interconnection Agreement should contain terms and \nconditions deemed appropriate by Participating TO for the Interconnection \nRequest.  If the Parties agree to proceed with design, procurement, and \nconstruction of facilities and upgrades under the agreed-upon terms of the \nunexecuted Large Load Interconnection Agreement, they may proceed pending \nFERC action.  As a condition to the Participating TO’s design, procurement, \nconstruction, or operation of any Large Load-Driven Upgrades (as defined in the \npro forma Large Load Cost Recovery Agreement set forth in Appendix V to the \nTO Tariff) associated with the Interconnection Request, the Large Load \nInterconnection Customer shall also, within the same period and subject to the \nsame consequences as the Large Load Interconnection Agreement, execute and \nmaintain a Cost Recovery Agreement substantially in the form set forth in \nAppendix V to the TO Tariff, or, if the Large Load Interconnection Customer \nrequests that the Cost Recovery Agreement be filed unexecuted with FERC, \ncomply with that agreement as made effective by FERC.  A Cost Recovery \nAgreement required by this LLIP Section 5.3 is entered into pursuant to the TO \nTariff. \n \n \n5.4 \nCommencement of Interconnection Activities \nIf Large Load Interconnection Customer executes the final Large Load \nInterconnection Agreement, Participating TO and Large Load Interconnection \nCustomer shall perform their respective obligations in accordance with the terms \nof the Large Load Interconnection Agreement, subject to modification by FERC.  \nUpon submission of an unexecuted Large Load Interconnection Agreement, Large \nLoad Interconnection Customer and Participating TO shall promptly comply with \nthe unexecuted Large Load Interconnection Agreement, if agreed to by the Parties \npursuant to LLIP Section 5.3, subject to modification by FERC. \n \nSection 6. \nConstruction of Participating TO's Interconnection Facilities and Large \nLoad Network Upgrades  \n \n \n6.1 \nSchedule \nParticipating TO and Large Load Interconnection Customer shall negotiate in \ngood faith concerning a schedule for the Participating TO’s construction of \nParticipating TO's Interconnection Facilities and the Large Load Network \nUpgrades.  \n \n \n6.2 \nConstruction Sequencing \n \n6.2.1 General.  In general, the Service Commencement Date will determine the \nsequence of construction of Large Load Network Upgrades. \n \n6.2.2 Advancing Construction of Large Load Network Upgrades that are \nPart of an Expansion Plan of the Participating TO.  A Large Load \nInterconnection Customer with a Large Load Interconnection Agreement,"},{"page":159,"startToken":60159,"endToken":60558,"text":"28 \n \nin order to maintain its Service Commencement Date, may request that \nParticipating TO advance to the extent necessary the completion of Large \nLoad Network Upgrades that:  (i) are necessary to support such Service \nCommencement Date and (ii) would otherwise not be completed, pursuant \nto an expansion plan of Participating TO or approved ISO Transmission \nPlan covering the Participating TO’s facilities, in time to support such \nService Commencement Date.  Upon such request, Participating TO will \nuse Reasonable Efforts to advance the construction of such Large Load \nNetwork Upgrades to accommodate such request; provided that Large \nLoad Interconnection Customer commits to pay Participating TO any \nassociated expediting costs.   \n \n6.3 \nSpecial Provisions for Affected Systems   \nThe Large Load Interconnection Customer shall timely enter into and maintain an \nagreement with each applicable Affected System Operator for each addition, \nmodification, or upgrade to an Affected System identified through the \nInterconnection Studies or an applicable Affected System study.  The agreement \nshall specify the terms governing payments to be made by the Large Load \nInterconnection Customer to the Affected System Operator, including financial \nsecurity or credit support sufficient to protect the Affected System Operator and \nits other customers against cost shifting.  Where a Cost Recovery Agreement \napplies, the Large Load Interconnection Customer shall provide the Participating \nTO the evidence of such agreements required by, and within the time specified in, \nthe Cost Recovery Agreement, and the Participating TO may decline to \ncommence, or may suspend, construction as provided in the Cost Recovery \nAgreement.   \n \nSection 7. \nMiscellaneous \n \n7.1 \nConfidentiality \n \nFor the purposes of this LLIP Section 7.1, “Party” or “Parties” shall mean the \nParticipating TO, Large Load Interconnection Customer, ISO, or any combination \nof the Participating TO, Large Load Interconnection Customer, or ISO.  \n \nConfidential Information shall include, without limitation, all information relating \nto a Party's technology, research and development, business affairs, and pricing. \n \nInformation is Confidential Information only if it is clearly designated or marked \nin writing as confidential on the face of the document, or, if the information is \nconveyed orally or by inspection, if the Party providing the information orally \ninforms the Party receiving the information that the information is confidential. \n \nIf requested by either Party, the other Party shall provide in writing, the basis for \nasserting that the information referred to in this LLIP Section 7.1 warrants \nconfidential treatment, and the requesting Party may disclose such writing to the"},{"page":160,"startToken":60558,"endToken":61027,"text":"29 \n \nappropriate Governmental Authority.  Each Party shall be responsible for the \ncosts associated with affording confidential treatment to its information. \n \n \n \n7.1.1 Scope.  Confidential Information shall not include information that the \nreceiving Party can demonstrate: (1) is generally available to the public \nother than as a result of a disclosure by the receiving Party; (2) was in the \nlawful possession of the receiving Party on a non-confidential basis before \nreceiving it from the disclosing Party; (3) was supplied to the receiving \nParty without restriction by a third party, who, to the knowledge of the \nreceiving Party after due inquiry, was under no obligation to the disclosing \nParty to keep such information confidential; (4) was independently \ndeveloped by the receiving Party without reference to Confidential \nInformation of the disclosing Party; (5) is, or becomes, publicly known, \nthrough no wrongful act or omission of the receiving Party or Breach of \nthe Large Load Interconnection Agreement; or (6) is required, in \naccordance with LLIP Section 7.1.6, Order of Disclosure, to be disclosed \nby any Governmental Authority or is otherwise required to be disclosed by \nlaw or subpoena, or is necessary in any legal proceeding establishing \nrights and obligations under the Large Load Interconnection Agreement. \nInformation designated as Confidential Information will no longer be \ndeemed confidential if the Party that designated the information as \nconfidential notifies the other Party that it no longer is confidential. \n \n7.1.2  Release of Confidential Information.  Neither Party shall release or \ndisclose Confidential Information to any other person, except to its \nAffiliates (limited by the Standards of Conduct requirements), employees, \nconsultants, Affected System Operators, the Large Load Customer, or to \nparties who may be providing or considering providing financing to or \nequity participation with Large Load Interconnection Customer or the \nLarge Load Customer, or to potential purchasers or assignees of Large \nLoad Interconnection Customer or the Large Load Customer, on a need-\nto-know basis in connection with these procedures, unless such person has \nfirst been advised of the confidentiality provisions of this LLIP Section 7.1 \nand has agreed to comply with such provisions.  Notwithstanding the \nforegoing, a Party providing Confidential Information to any person shall \nremain primarily responsible for any release of Confidential Information \nin contravention of this LLIP Section 7.1. \n \n7.1.3 Rights.  Each Party retains all rights, title, and interest in the Confidential \nInformation that each Party discloses to the other Party.  The disclosure by \neach Party to the other Party of Confidential Information shall not be \ndeemed a waiver by either Party or any other person or entity of the right \nto protect the Confidential Information from public disclosure. \n \n7.1.4 No Warranties.  By providing Confidential Information, neither Party \nmakes any warranties or representations as to its accuracy or \ncompleteness.  In addition, by supplying Confidential Information, neither"},{"page":161,"startToken":61027,"endToken":61520,"text":"30 \n \nParty obligates itself to provide any particular information or Confidential \nInformation to the other Party nor to enter into any further agreements or \nproceed with any other relationship or joint venture. \n \n7.1.5 Standard of Care.  Each Party shall use at least the same standard of care \nto protect Confidential Information it receives as it uses to protect its own \nConfidential Information from unauthorized disclosure, publication or \ndissemination.  Each Party may use Confidential Information solely to \nfulfill its obligations to the other Party under these procedures or its \nregulatory requirements. \n \n7.1.6 Order of Disclosure.  If a court or a Governmental Authority or entity \nwith the right, power, and apparent authority to do so requests or requires \neither Party, by subpoena, oral deposition, interrogatories, requests for \nproduction of documents, administrative order, or otherwise, to disclose \nConfidential Information, that Party shall provide the other Party with \nprompt notice of such request(s) or requirement(s) so that the other Party \nmay seek an appropriate protective order or waive compliance with the \nterms of these confidentiality provisions. Notwithstanding the absence of a \nprotective order or waiver, the Party may disclose such Confidential \nInformation which, in the opinion of its counsel, the Party is legally \ncompelled to disclose.  Each Party will use Reasonable Efforts to obtain \nreliable assurance that confidential treatment will be accorded any \nConfidential Information so furnished. \n \n7.1.7 Remedies.  The Parties agree that monetary damages would be inadequate \nto compensate a Party for the other Party's Breach of its obligations under \nthis LLIP Section 7.1.  Each Party accordingly agrees that the other Party \nshall be entitled to equitable relief, by way of injunction or otherwise, if \nthe first Party Breaches or threatens to Breach its obligations under this \nLLIP Section 7.1, which equitable relief shall be granted without bond or \nproof of damages, and the receiving Party shall not plead in defense that \nthere would be an adequate remedy at law.  Such remedy shall not be \ndeemed an exclusive remedy for the Breach of this LLIP Section 7.1, but \nshall be in addition to all other remedies available at law or in equity.  The \nParties further acknowledge and agree that the covenants contained herein \nare necessary for the protection of legitimate business interests and are \nreasonable in scope.  No Party, however, shall be liable for indirect, \nincidental, or consequential or punitive damages of any nature or kind \nresulting from or arising in connection with this LLIP Section 7.1. \n \n7.1.8 Disclosure to FERC, its Staff, or a State.  Notwithstanding anything in \nthis LLIP Section 7.1 to the contrary, and pursuant to 18 CFR section \n1b.20, if FERC or its staff, during the course of an investigation or \notherwise, requests information from one of the Parties that is otherwise \nrequired to be maintained in confidence pursuant to the LLIP, the Party \nshall provide the requested information to FERC or its staff, within the"},{"page":162,"startToken":61520,"endToken":61973,"text":"31 \n \ntime provided for in the request for information.  In providing the \ninformation to FERC or its staff, the Party must, consistent with 18 CFR \nsection 388.112, request that the information be treated as confidential and \nnon-public by FERC and its staff and that the information be withheld \nfrom public disclosure.  Parties are prohibited from notifying the other \nParty prior to the release of the Confidential Information to FERC or its \nstaff.  The Party shall notify the other Party to the Large Load \nInterconnection Agreement when it is notified by FERC or its staff that a \nrequest to release Confidential Information has been received by FERC, at \nwhich time either of the Parties may respond before such information \nwould be made public, pursuant to 18 CFR section 388.112.  Requests \nfrom a state regulatory body conducting a confidential investigation shall \nbe treated in a similar manner, consistent with applicable state rules and \nregulations. \n \n7.1.9 Subject to the exception in LLIP Section 7.1.8, any information that a \nParty claims is competitively sensitive, commercial or financial \ninformation (\"Confidential Information\") shall not be disclosed by the \nother Party to any person not employed or retained by the other Party, \nexcept to the extent disclosure is (i) required by law; (ii) reasonably \ndeemed by the disclosing Party to be required to be disclosed in \nconnection with a dispute between or among the Parties, or the defense of \nlitigation or dispute; (iii) otherwise permitted by consent of the other \nParty, such consent not to be unreasonably withheld;  or (iv) necessary to \nfulfill its obligations under this LLIP or as a Participating TO, including \ndisclosing the Confidential Information to the ISO or to a subregional, \nregional or national reliability organization or planning group.  The Party \nasserting confidentiality shall notify the other Party in writing of the \ninformation it claims is confidential.  Prior to any disclosures of the other \nParty's Confidential Information under this subparagraph, or if any third \nparty or Governmental Authority makes any request or demand for any of \nthe information described in this subparagraph, the disclosing Party agrees \nto promptly notify the other Party in writing and agrees to assert \nconfidentiality and cooperate with the other Party in seeking to protect the \nConfidential Information from public disclosure by confidentiality \nagreement, protective order or other reasonable measures. \n \n7.1.10 This provision shall not apply to any information that was or is hereafter in \nthe public domain (except as a result of a Breach of this provision). \n \n7.1.11 Participating TO shall, at Large Load Interconnection Customer's election, \ndestroy, in a confidential manner, or return the Confidential Information \nprovided at the time the Confidential Information is no longer needed. \n \n \n7.2 \nDisputes"},{"page":163,"startToken":61973,"endToken":62073,"text":"32 \n \n \n \n7.2.1  Submission.  In the event either Party has a dispute, or asserts a claim, that \narises out of or in connection with the Large Load Interconnection \nAgreement, the LLIP, or their performance, such Party (the \"disputing \nParty\") shall provide the other Party with written notice of the dispute or \nclaim (\"Notice of Dispute\").  Such dispute or claim shall be resolved in \naccordance with Section 14 of the TO Tariff, including, as applicable, the \nISO ADR Procedures; provided, however, that disputes arising under a \nCost Recovery Agreement shall be resolved under the dispute resolution \nprovisions of that agreement."},{"page":164,"startToken":62073,"endToken":62312,"text":"33 \n \n  \nATTACHMENT 1 \nTO APPENDIX VI – LARGE LOAD INTERCONNECTION PROCEDURES \n \nINTERCONNECTION REQUEST FORM \n \nThis Interconnection Request is submitted to LS Power Grid California, LLC (“Participating \nTO”) by the Eligible Customer for Large Load (“ECLL”) identified below, acting as the Large \nLoad Interconnection Customer, pursuant to LLIP Section 4.2.1 and Section 10A of the TO \nTariff.  Consistent with LLIP Section 3.1, the Large Load Interconnection Customer shall send a \ncopy of this Interconnection Request to the ISO.  Capitalized terms not defined herein have the \nmeanings set forth in the LLIP or, if not defined in the LLIP, in Section 3 of the TO Tariff. \n \nI. \n Large Load Interconnection Customer (ECLL) Contact Information \nCompany Name \n \nType of ECLL (UDC or MSS) \n \nRepresentative \n \nAddress \n \nEmail \n \nPhone \n \n \nII. \nLarge Load Customer Information \nLarge Load Customer Name \n \nLarge Load Customer Representative and \nContact Information \n \nLarge Load Site Location/Address \n \nType of Large Load Facility (e.g., data \ncenter, industrial) \n \nOther ECLL interconnection requests \nsubmitted for the same Large Load \nCustomer or any of its affiliates (see \nSection 10A.2.1 of the TO Tariff) \n \n \nIII. \nPoint of Interconnection \n \nPlease identify the location and voltage \nlevel of the preferred Point of \nInterconnection in as much detail as \npossible. If proposing to connect to a \ntransmission line, provide the approximate \ndistance from one of the existing line \nterminals.  The Point of Interconnection \nwill serve as the Point of Withdrawal under \nthe TO Tariff."},{"page":165,"startToken":62312,"endToken":62516,"text":"34 \n \n \nIV. \nLarge Load Capacity and Load Ramp Schedule \n \n \nProposed load ramp schedule identifying anticipated load additions over time: \nDate (MM/DD/YYYY) \nIncremental Load (MW) \nCumulative Load (MW) \n \n \n \n \n \n \n \n \n \n \n \n \n \nV. \nProposed Service Commencement Date and Term \n \n \nVI. \nSource of Power \n \n \nVII. \nSite Plan, Site Control, and Permits \n \nPlease attach: (a) a site plan for the Large Load; (b) documentation demonstrating Site Control, \nas defined in Section 3 of the TO Tariff; and (c) documentation demonstrating that the Large \nMaximum Large Load capacity requested \nat the Point of Interconnection (MW) (see \nLLIP Section 3.6) \n \nMaximum capacity the Large Load is \ncapable of withdrawing, if greater than the \namount requested, and the proposed means \nof limiting withdrawals to the requested \namount \n \nExpected power factor and load factor \n \nProposed date for energizing the ECLL \nInterconnection (MM/DD/YYYY) \n \nProposed Service Commencement Date \n(MM/DD/YYYY) (see LLIP Section 3.7) \n \nProposed term of service (years) \n \nPlease identify the electrical location of the \nsource of power to be delivered to the \nLarge Load, if known.  If the source of the \npower is not known, a system purchase \nwill be assumed.  Nothing in this \nInterconnection Request constitutes a \nrequest for transmission service (see LLIP \nSection 3.2.2)."},{"page":166,"startToken":62516,"endToken":62791,"text":"35 \n \nLoad Customer has local permits and regulatory approvals for development of the Large Load, \nconsistent with Section 10A.2.1(f) of the TO Tariff. \n \nVIII. Co-Located Generation \n \nWill the Large Load be co-located with a \ngenerating facility? (Yes/No) \n \nWill the generating facility export to the \nISO Controlled Grid? (Yes/No) \n \nGenerating facility queue number or, if \nexecuted, identification of its generator \ninterconnection agreement \n \nGenerating facility nameplate capacity \n(MW) \n \n \nIX. \nSingle-Line Diagram and Modeling Information \n \nPlease attach a single-line diagram of the Large Load and the Large Load Interconnection \nCustomer’s Interconnection Facilities and/or KMZ files to this Interconnection Request.  Please \nprovide power flow modeling files (PSS/E or PSLF format preferred) or spreadsheet format \ncontaining modeling data such as impedances and ratings of customer-owned equipment. Also \nprovide short-circuit modeling data, dynamic and electromagnetic transient (EMT) models, load \ncharacteristics (including ride-through capability, ramp rates, and harmonic characteristics), any \nother details to be taken into consideration in the Interconnection Studies, and the completed \ntechnical data form in the form of Appendix A to this Attachment 1. \n \nX. \nRequired Submittals (LLIP Section 4.2.1) \nItem \nIncluded (Yes/No) \nInterconnection Study Deposit of $250,000 \n \nCommercial Readiness Deposit equal to \ntwo times the Interconnection Study \nDeposit, in a form permitted by LLIP \nSection 4.7.1 \n \nDemonstration of Site Control \n \nCompleted technical data form in the form \nof Appendix A to this Attachment 1 (TO \nTariff Section 10A.2.1(j)) \n \nCopy of this Interconnection Request sent \nto the ISO \n \n \nXI. \nAcknowledgment \n \nBy submission of this Interconnection Request, the Large Load Interconnection Customer \nacknowledges that additional detail may be required to satisfactorily perform the Interconnection"},{"page":167,"startToken":62791,"endToken":62866,"text":"36 \n \nStudies related to this Interconnection Request and agrees to work with LS Power Grid \nCalifornia, LLC in good faith to provide additional information as necessary.  The Large Load \nInterconnection Customer may designate information in this Interconnection Request, including \nthe identity of the Large Load Customer, as Confidential Information in accordance with LLIP \nSection 7.1. \n \nInterconnection Request Submitted By: \n \n \n \n \n \n \n \n \n \nInterconnection Request Received By LS Power Grid California, LLC: \n \n \n \n \n \n \n \n \nPrinted Name: \n \nDate: \n \n \nPrinted Name: \n \nDate:"},{"page":168,"startToken":62866,"endToken":62875,"text":"Attachment 2 \n \nLS Power Grid TO Tariff Revisions (Marked)"},{"page":169,"startToken":62875,"endToken":63050,"text":"1 \nLS Power GridLSPGC TO Tariff \n \n \nLS Power Grid California, LLC \nTransmission Owner Tariff \n \n \nTable of Contents \n \n1. \nPreamble \n1.1 \nTransmission Access for Wheeling Customers \n1.2 \nTransmission Access for End-UserUsers \n2. \nEffective Date \n2.1 \nTermination \n3. \nTO Definitions \n4. \nEligibility for Service \n5. \nAccess Charges and Transmission Rates \n5.1 \nWheeling Access Charge \n5.2 \nTransmission Revenue Requirement \n5.3 \nTransmission Revenue Balancing Account Adjustment \n6. \nAncillary Services - Applicability and Charges \n7. \nBilling and Payment \n8. \nObligation to Interconnect or Construct Transmission Expansions and Facility \nUpgrades \n8.1 \nParticipating TO Obligation to Interconnect \n8.2 \nParticipating TO Obligation to Construct Transmission \nExpansionExpansions or Facility Upgrades \n8.3 \nRequest for FERC Deference Regarding Need Determination \n9. \nExpansion Participating TO Process for Construction or Expansion of \nTransmission Facilities \n9.19.1 Applicability and  Determination of Facilities \n9.2 \nObligation to Build \n9.3 \nProvisions Relating To Transmission Construction On the Systems of \nOther TOs \n10. \nTSWL  \nInterconnection Process \n10.1 \nApplicability \n10.2 \nTSWL Interconnection Applications \n10.3 \nReview of Completed TSWL Interconnection Application"},{"page":170,"startToken":63050,"endToken":63227,"text":"2 \nLS Power GridLSPGC TO Tariff \n \n \n10.4 \nNotice of Need for System Impact Study \n10.5 \nSystem Impact Study Cost Reimbursement and Agreement \n10.6 \nSystem Impact Study Procedures \n10.7 \nNotice of Need for Facilities Study \n10.8 \nFacilities Study Procedures \n10.9 \nInterconnection Agreement \n10.10 \nPartial Interim Service \n10.11 \nExpedited Interconnection Procedures \n10A. Interconnection Process for ECLL Interconnections \n10A.1 \nApplicability \n10A.2 \nECLL Application and Application Fee \n10A.3 \nStudy Process and ECLL Interconnection Agreement \n10A.4 \nInterim Service \n10A.5 \nCo-Located Large Load \n11. \nUncontrollable Forces and Indemnification \n11.1 \nProcedures to Follow ofIf Uncontrollable Force Occurs \n11.2 \nIndemnification \n12. \nRegulatory Filings \n12.1 \nOpen Access \n13. \nCreditworthiness \n13.1 \nUDCs, MSSs, and Scheduling Coordinators Using the Participating \nTO’s Low Voltage Transmission Facilities \n13.2 \nEnd-Users \n1314. Disputes \n1415. Miscellaneous \n14.115.1 Notices \n14.215.2 Waiver \n14.315.3 Confidentiality \n14.415.4 TO Tariff Supersedes Existing Tariffs \n14.515.5 Titles \n14.615.6 Severability \n14.715.7 Preservation of Obligations \n14.815.8 Governing Law"},{"page":171,"startToken":63227,"endToken":63286,"text":"3 \nLS Power GridLSPGC TO Tariff \n \n \n14.915.9 Appendices Incorporated \n14.1015.10 \nConflict with CAISO Tariff \n14.1115.11 \nConflicting Operating Instructions \n \nAppendix I \n \nTransmission Revenue Requirement and TRBAA  \nAppendix II \n \nNotices \nAppendix III    \nFormula Rate \nAppendix IV    \nFormula Rate Implementation Protocols \nAppendix V \n \nPro Forma Large Load Cost Recovery Agreement \nAppendix VI  \nLarge Load Interconnection Procedures"},{"page":172,"startToken":63286,"endToken":63723,"text":"4 \nLS Power GridLSPGC TO Tariff \n \n \n1. \nPreamble. The Participating TO’s revenue requirements and applicable rates and \ncharges for transmission access over the CAISO Controlled Grid and the terms and \nconditions for transmission expansion and interconnection are set forth in this TO \nTariff and the CAISO Tariff.  For purposes of this TO Tariff and the CAISO Tariff, \nLS Power Grid California, LLC (“LS Power GridLSPGC”) is a Non-Load-Serving \nParticipating TO and has no End-Use Customers.  \n \n1.1 \nTransmission Access for Wheeling Customers.  Wheeling allows Scheduling \nCoordinators to deliver Energy through or out of the CAISO Controlled Grid to \nserve a load located outside the transmission or Distribution System of a \nParticipating TO. Wheeling Access Charges shall be paid by Scheduling \nCoordinators to the CAISO pursuant to the CAISO Tariff. \n \n1.2 \nTransmission Access for End-Users.  End-Users receive transmission service \nover the CAISO Controlled Grid through the Scheduling Coordinator designated \nby the End-User.  Charges to UDCs or MSSs of each Participating TO on behalf \nof the End-Users for access to the CAISO Controlled Grid shall be paid to the \napplicable Participating TO consistent with the distribution of the Regional \nAccess Charge in Section 26.1.3 of the CAISO Tariff.   \n \n \n2.    \nEffective Date.  This TO Tariff is effective on the date accepted by the FERC and shall \ncontinue to be effective, as amended from time to time, so long as LSPGC is a party to \nthe Transmission Control Agreement. \n \n2.1 \nTermination. This TO Tariff may be terminated by LSPGC upon such \nadvance notice and with such authorization as FERC may require. \n \n \n3.    \nTO Definitions. Certain capitalized terms used in this TO Tariff shall have the meanings \nset out below unless otherwise stated or the context otherwise requires. Capitalized terms \nused in this TO Tariff and not defined below shall have the meanings set out in the \nCAISO Tariff as it may be amended from time to time. \n \n3.1 \nAccess Charge.   A charge paid by all UDCs, MSSs, and, in certain cases, \nScheduling Coordinators delivering Energy to Gross Load, as set forth in Section \n26.1 of the CAISO Tariff.   \n \n3.2 \nAGC. Generation equipment that automatically responds to signals from the \nCAISO’s EMS control in real time to control the power output of electric \ngenerators within a prescribed area in response to a change in system frequency, \ntie-line loading, or the relation of these to each other, so as to maintain the target \nsystem frequency and/or the established interchange with other areas within the \npredetermined limits. \n \n3.3 \nAncillary Services.  Regulation, Spinning Reserve, Non-Spinning Reserve, \nVoltage Support and Black Start together with such other interconnected"},{"page":173,"startToken":63723,"endToken":64085,"text":"5 \nLS Power GridLSPGC TO Tariff \n \n \noperation services as the CAISO may develop in cooperation with Market \nParticipants to support the transmission of Energy from generation resources to \nLoads while maintaining reliable operation of the CAISO Controlled Grid in \naccordance with Good Utility Practice. \n \n3.4 \nApplicable Reliability Criteria. The Reliability Standards and reliability criteria \nestablished by NERC and WECC, and Local Reliability Criteria, as amended \nfrom time to time, including any requirement of the Nuclear Regulatory \nCommission. \n \n3.5 \nAvailable Transfer Capacity. The available capacity of a given transmission \npath, in MW after allocation of rights associated with Existing Contracts and \nTransmission Ownership Rights, to that path’s Operating Transfer Capability \nestablished consistent with CAISO and WECC transmission capacity rating \nguidelines, as further described in Appendix L to the CAISO Tariff. \n \n3.6 \nBase Transmission Revenue Requirement. The Transmission Revenue \nRequirement which does not reflect amounts for the TRBAA. \n \n3.7 \nBlack Start. The procedure by which a Generating Unit self-starts without an \nexternal source of electricity, thereby restoring power to the CAISO Controlled \nGrid following system or local area blackouts. \n \n3.8 \nBusiness Day.  Monday through Friday, excluding federal holidays and the day \nafter Thanksgiving Day. \n3.9 \nCalifornia Independent System Operator (“CAISO”). The California \nIndependent System Operator Corporation, a state chartered, California \nnonprofit public benefit corporation that operates the transmission facilities of \nall Participating TOs and dispatches certain Generating Units and Loads. \n3.10 \nCAISO ADR Procedures. The procedures for resolution of disputes or \ndifferences set out in Section 13 of the CAISO Tariff, as amended from time to \ntime. \n \n3.11 \nCAISO Controlled Grid. The system of transmission lines and associated \nfacilities of the Participating TOs that have been placed under the CAISO’s \nOperational Control. \n \n3.12 \nCAISO Protocols.  The rules, protocols, procedures and standards \npromulgated by the CAISO (as amended from time to time) to be complied \nwith by the CAISO Scheduling Coordinators, Participating TOs and all other \nMarket Participants in relation to the operation of the CAISO Controlled Grid \nand the participation in the markets for Energy and Ancillary Services in \naccordance with the CAISO Tariff. \n \n3.13 \nCAISO Tariff.   The California Independent System Operator Agreement and"},{"page":174,"startToken":64085,"endToken":64472,"text":"6 \nLS Power GridLSPGC TO Tariff \n \n \nTariff, dated March 31, 1997, as it may be modified from time to time. \n \n3.14 \nCo-Located Large Load. A Large Load that is physically connected to the \nfacilities of an existing or planned Generating Facility on the Interconnection \nCustomer’s side of the Point of Interconnection to the CAISO Controlled Grid \n(each as defined in the CAISO Tariff). \n \n3.143.15 \nCompleted Application Date. The date on which a party submits \nan a TSWL Interconnection Application or ECLL Interconnection \nApplication that satisfies the requirements of a Completed TSWL \nInterconnection Application or Completed ECLL Interconnection \nApplication, as applicable. \n \n3.16 \nCompleted ECLL Interconnection Application. An ECLL Interconnection \nApplication that has been deemed valid under Section 4.3 of Appendix VI. \n \n3.153.17 \nCompleted TSWL Interconnection Application. An A TSWL \nInterconnection Application that satisfies all of the information and other \nrequirements of Section 10.3 of this TO Tariff and, if applicable, the information \nrequirements as specified by the CAISO and posted on the CAISO Home Page. \n \n3.163.18 \nCongestion. A characteristic of the transmission system produced by a \nbinding Constraint to the optimum economic dispatch to meet Demand such that \nthe LMP, exclusive of Marginal Cost of Losses, at different Locations of the \ntransmission system is not equal. \n \n3.173.19 \nCongestion Management. The alleviation of Congestion in \naccordance with applicable CAISO Protocols and Good Utility Practice. \n \n3.183.20 \nConverted Rights. Those transmission service rights determined in \naccordance with Section 4.3.1.6 of the CAISO Tariff. \n \n3.21 \nCost Recovery Agreement. An agreement between the Participating TO and an \nEligible Customer, including an ECLL, substantially in the form of the pro forma \nLarge Load Cost Recovery Agreement set forth in Appendix V, entered into \npursuant to Section 10.9 or Section 10A.6 of this TO Tariff. \n \n3.193.22 \nCPUC. The California Public Utilities Commission or its successor. \n \n3.203.23 \nDemand. The rates at which Energy is delivered to Load and Scheduling \nPoints by Generation, transmission or distribution facilities. It is the product of \nvoltage and the in-phase component of alternating current measured in units of \nwatts or standard multiples therefore, e.g. 1000 W = 1 kW, 1000 kW= 1 MW, \netc. \n \n3.213.24 \nDirect Assignment Facilities. Facilities or portions of facilities that are"},{"page":175,"startToken":64472,"endToken":64873,"text":"7 \nLS Power GridLSPGC TO Tariff \n \n \nowned by the Participating TO necessary to physically and electrically \ninterconnect a particular party requesting interconnection a TSWL \nInterconnection under this TO Tariff to the CAISO Controlled Grid at the point \nof interconnection. Direct Assignment Facilities shall be specified in the \nInterconnection Agreement that governs TSWL Interconnection service to such \nparty and shall be subject to FERC approval.  \n \n3.223.25 \nDispatch. The operating control of an integrated electric system to: i) \nassign specific Generation Units and other sources of supply to effect the supply \nto meet the relevant area Demand taken as Load rises or falls; ii) control \noperations and maintenance of high voltage lines, substations, and equipment, \nincluding administration of safety procedures; iii) operate Interconnections; iv) \nmanage Energy transactions with other interconnected Control Areas; and v) \ncurtail Demand. \n \n3.233.26 \nDistribution System. The distribution assets of a TO, UDC, or MSS. \n \n3. 243.27 \nEligible Customer. (i) Any utility (including any Participating TO, \nMarket Participant or power marketer), Federal power marketing agency, or any \nperson generating Energy for sale or resale; Energy sold or produced by such \nentity may be Energy produced in the United States, Canada or Mexico; however, \nsuch entity is not eligible for transmission service that would be prohibited by \nFPA Section 212(h)(2); and (ii) any retail customer taking unbundled transmission \nservice pursuant to a state retail access program or pursuant to a voluntary offer of \nunbundled retail transmissions service by the Participating TO. \n \n3.28 \nEligible Customer for Large Load (“ECLL”). A UDC or MSS that provides \nretail transmission and interconnection service to Large Load End-Users in the \nCAISO’s Balancing Authority Area. \n \n3.29 \nECLL Interconnection. The interconnection of the facilities of an ECLL to the \nfacilities of the Participating TO that are for the purpose of an ECLL \ninterconnecting and providing transmission service to a Large Load Customer. \n \n3.30 \nECLL Interconnection Agreement. The agreement between an ECLL and the \nParticipating TO governing an ECLL Interconnection. \n \n3.31 \nECLL Interconnection Application. An application that requests an ECLL \nInterconnection to the CAISO Controlled Grid. \n \n3.32 \nECLL Interconnection Facilities. The facilities, additions, and upgrades of the \nParticipating TO necessary to accomplish an ECLL Interconnection, as identified \nin the applicable ECLL Interconnection Agreement. \n \n3.253.33 \nEncumbrance. A legal restriction or covenant binding on the \nParticipating TO that affects the operation of any transmission lines or associated"},{"page":176,"startToken":64873,"endToken":65277,"text":"8 \nLS Power GridLSPGC TO Tariff \n \n \nfacilities and which the CAISO needs to take into account in exercising \nOperational Control over such transmission lines or associated facilities if the \nParticipating TO is not to risk incurring significant liability. Encumbrances shall \ninclude Existing Contracts and may include: (1) other local restrictions or \ncovenants meeting the definition of Encumbrance and arising under other \narrangements entered into before the CAISO Operations Date, if any; and (2) \nlegal restrictions or covenants meeting the definition of Encumbrance and arising \nunder a contract or other arrangement entered into after the CAISO Operations \nDate. \n \n3.263.34 \nEnd-Use Customer or End-User. A purchaser of electric power that \npurchases such power to satisfy a Load directly connected to the CAISO \nControlled Grid or to a Distribution System and who does not resell the power. \n \n3.273.35 \nEnergy. The electrical energy produced, flowing, or supplied by \nGeneration, transmission, or distribution facilities, being the integral with \nrespect to time of the instantaneous power, measured in units of watt-hours or \nstandard multiples thereof. E.g. 1000 Wh = 1 kW, 1000 kWh = 1 MWh, etc. \n \n3.283.36 \nEntitlement. The right of a Participating TO obtained through \ncontract or other means to use another entity’s transmission facilities for the \ntransmission of Energy. \n \n3.293.37 \nExisting Contracts.  Those transmission service agreements or \nother contracts which grant transmission service rights in existence on the \nCAISO Operations Date (including any contracts entered into pursuant to such \ncontracts) as may be amended in accordance with their terms or by agreement \nbetween the parties thereto from time to time. \n \n3.303.38 \nExisting Rights. Those transmission service rights defined in Section \n16.1 of the CAISO Tariff. \n \n3.313.39 \nExpedited Interconnection Agreement. A contract between a \nparty which has submitted a Request for Expedited Interconnection Procedures \nand the Participating TO under which the Participating TO agrees to process, \non an expedited basis, the Completed TSWL Interconnection Application of \nsuch party and which sets forth the terms, conditions, and cost responsibilities \nfor such TSWL Interconnection. \n \n3.323.40 \nFacilities Study Agreement. An agreement between a Participating \nTO and either a party requesting Interconnection to the CAISO Controlled Grid, \nMarket Participants, Project Sponsor, ECLL, or identified principal beneficiaries \npursuant to which the party requesting such Interconnection, Market Participant, \nProject Sponsor or identified principal beneficiaries  agrees to reimburse the \nParticipating TO for the cost of performing or reviewing a Facilities Study."},{"page":177,"startToken":65277,"endToken":65652,"text":"9 \nLS Power GridLSPGC TO Tariff \n \n \n3.333.41 \nFacility or Facilities Study. An engineering study conducted to \ndetermine required modifications to the Participating TO’s transmission system, \nincluding the estimated cost and scheduled completion date for such \nmodifications, that will be required to provide needed services. \n \n3.343.42 \nFERC. The Federal Energy Regulatory Commission, or its successor. \n \n3.43 \nFirm Interconnection Service. The highest quality (priority) load \nInterconnection service that provides the on-going safe and reliable operation and \nmaintenance of, and the Parties’ rights and responsibilities associated with their \nfacilities. \n \n3.44 \nFlexible Interim Load Interconnection (“FILI”) Service. A transmission \ninterconnection service offered by the Participating TO and accepted by an \nEligible Customer on behalf of a Large Load retail customer to manage \noperational constraints on withdrawals from the transmission system while the \ninterconnection and system upgrades necessary to provide Firm Interconnection \nService are being developed. \n \n3.45 \nFILI Service Agreement. The agreement developed by the Participating TO \npursuant to Section 10A.4 that sets forth the terms, conditions, and operating \nrequirements for FILI Service. \n \n3.353.46 \nFPA. The Federal Power Act, 16 U.S.C.§ 791a et seq., as it may \nbe amended from time to time. \n \n3.47 \nGenerating Facility. An Interconnection Customer’s Generating Unit(s) used for \nthe production and/or storage for later injection of electricity identified in the \nInterconnection Request, but shall not include the Interconnection Customer’s \nInterconnection Facilities. \n \n3.363.48 \nGenerating Unit. An individual electric generator and its associated \nplant and apparatus whose electrical output is capable of being separately \nidentified and metered or a Physical Scheduling Plant, that, in either case, is: (a) \nlocated within the CAISO Control Area; (b) connected to the CAISO Controlled \nGrid, either directly or via interconnected transmission or distribution facilities; \nand (c) that is capable of producing and delivering net Energy (Energy in excess \nof a generation stations’ internal power requirements). \n \n3.373.49 \nGeneration. Energy delivered from a Generating Unit. \n \n3.50 \nGenerator Interconnection. The interconnection of one or more Generating \nUnits to the CAISO Controlled Grid facilities owned by the Participating TO. \n \n3.393.51 \nGood Utility Practice. Any of the practices, methods, and acts \nengaged in or approved by a significant portion of the electric utility industry"},{"page":178,"startToken":65652,"endToken":66135,"text":"10 \nLS Power GridLSPGC TO Tariff \n \n \nduring the relevant time period, or any of the practices, methods, and acts which, \nin the exercise of reasonable judgment in light of the facts known at the time the \ndecision was made, could have been expected to accomplish the desired result at \na reasonable cost consistent with good business practices, reliability, safety, and \nexpedition. \n \n3.403.52 \nGross Load. For purposes of calculating the transmission Access \nCharge, Gross Load is all Energy (adjusted for distribution losses) delivered for \nthe supply of End-Use Customer Loads directly connected to the transmission \nfacilities or directly connected to the Distribution System of a Utility \nDistribution Company or MSS Operator located in a PTO Service Territory. \nGross Load shall exclude (1) Load with respect to which the Wheeling Access \nCharge is payable, (2) Load that is exempt from the Access Charge pursuant to \nSection 4.1, Appendix I of the CAISO Tariff, and the portion of the load of an \nindividual retail customer of a Utility Distribution Company, Small Utility \nDistribution Company or MSS Operator that is served by a Generating Unit that: \n(a) is located on the customer’s site or provides service to the customer’s site \nthrough over-the-fence arrangements as authorized by Section 218 of the \nCalifornia Public Utilities Code; (b) is a qualifying small power production \nfacility or qualifying cogeneration facility, as those terms are defined in the \nFERC’s regulations implementing Section 201 of the Public Utility Regulatory \nPolicies Act of 1978; and (c) secures Standby Service from the Participating TO \nunder terms approved by a Local Regulatory Authority or FERC, as applicable, \nor can be curtailed concurrently with an Outage of the Generating Unit serving \nthe Load.  Gross Load forecasts consistent with filed Transmission Revenue \nRequirements will be provided by each Participating TO to the CAISO. \n \n3.41 \nInterconnection. Transmission facilities, other than additions or replacements \nto existing facilities that: (i) connect one system to another system where the \nfacilities emerge from one and only one substation of the two systems and are \nfunctionally separate from the CAISO Controlled Grid facilities such that the \nfacilities are, or can be, operated and planned as a single facility; (ii) are \nidentified as retail transmission lines pursuant to contract; or (iii) produce \nGeneration at a single point on the CAISO Controlled Grid; provided that such \nInterconnection does not include facilities that, if not owned by the Participating \nTO, would result in a reduction in the CAISO’s Operational Control of the \nParticipating TO’s portion of the CAISO Controlled Grid. \n \n3.423.53 \nInterconnection Agreement. A contract between a party requesting \na TSWL Interconnection and thea Participating TO that owns the transmission \nfacility with which the requesting party wishes to interconnect, as it may be \namended from time to time, and, for an ECLL Interconnection, the ECLL \nInterconnection Agreement. \n \n3.43 \nInterconnection Application. An application that requests Interconnection to the \nCAISO Controlled Grid."},{"page":179,"startToken":66135,"endToken":66528,"text":"11 \nLS Power GridLSPGC TO Tariff \n \n \n \n3.443.54 \nInterest. Interest shall be calculated in accordance with the \nmethodology specified for interest on refunds in the regulations of FERC at 18 \nC.F.R. §35.19 35.19a(a)(2)(iii)(2013). Interest on delinquent amounts shall be \ncalculated from the due date of the bill to the date of payment. When payments \nare made by mail, bills shall be considered as having been paid on the date of \nreceipt. Notwithstanding the foregoing, interest, if any, on amounts payable or \nrefundable between the Participating TO and a party to a Cost Recovery \nAgreement shall be governed solely by that Cost Recovery Agreement. \n \n3.55 \nInterim Firm Interconnection Service. Interconnection service that can be \nprovided, if any, on a firm basis prior to the completion of the ECLL \nInterconnection Facilities and an authorization for the Large Load to withdraw \nEnergy. \n \n3.56 \nLarge Load. An End-User located at a single site behind one or more Point(s) of \nWithdrawal from the CAISO Controlled Grid and that has a peak load of 50 MW \nor greater. \n \n3.453.57 \nLoad. An end-use device of an End-Use Customer that consumes \npower.  Load should not be confused with Demand, which is the measure of \npower that a Load receives or requires. \n3.463.58 \nLocal Publicly Owned Electric Utility. A municipality or municipal \ncorporation operating as a public utility furnishing electric service, a municipal \ndistrict furnishing electric services, or a joint powers authority that includes one \nor more of these agencies and that owns Generation or transmission facilities, or \nfurnishes electric services over its own or its members’ electric Distribution \nSystem. \n \n3.473.59 \nLocal Regulatory Authority. The state or local governmental \nauthority responsible for the regulation or oversight of a utility. \n \n3.483.60 \nLocal Reliability Criteria. Reliability criteria established by the \nCAISO, unique to the transmission systems of each of the Participating TOs, as \nthey may be updated from time to time. \n \n3.493.61 \nLS Power Grid California, LLC (“LS Power GridLSPGC”).  The \nDelaware limited liability company that is the Participating TO under this TO \nTariff. \n \n3.503.62 \nMarket Participant. An entity, including a Scheduling \nCoordinator, who participates in the Energy marketplace through the buying, \nselling, transmission, or distribution of Energy or Ancillary Services into, out \nof, or through the CAISO Controlled Grid."},{"page":180,"startToken":66528,"endToken":66944,"text":"12 \nLS Power GridLSPGC TO Tariff \n \n \n3.513.63 \nMetered Subsystem (“MSS”).  A geographically contiguous \nsystem, located within a single zone which has been operating as an electric \nutility for a number of years prior to the CAISO Operations Date as a \nmunicipal utility, water district, irrigation district, state agency or federal \npower marketing authority subsumed within the CAISO Balancing Authority \nArea and encompassed by CAISO certified revenue quality meters at each \ninterface point with the CAISO Controlled Grid and CAISO-certified revenue \nquality meters on all Generating Units or, if aggregated, each individual \nresource and Participating Load , Reliability Demand Response Resource, and \nProxy Demand Resource internal to the system, which is operated in \naccordance with a MSS agreement described in Section 4.9.1 of the CAISO \nTariff. \n \n3.523.64 \nNERC.  The North American Electric Reliability Corporation or its \nsuccessor. \n \n3.533.65 \nNew Participating TO. A Participating TO that is not an Original \nParticipating TO. \n \n3.543.66 \nNon-Load-Serving Participating TO. A Participating TO that does \nnot serve Load. \n \n3.553.67 \nNon-Participating TO. A TO that is not a party to the TCA or, for \nthe purpose of Section 16.1 of the CAISO Tariff, the holder of transmission \nservice rights under an Existing Contract that is not a Participating TO. \n \n3.563.68 \nNon-Spinning Reserve. The portion of off-line generating capacity \nthat is capable of being synchronized and ramping to a specified load in ten \nminutes (or load that is capable of being interrupted in ten minutes) and that is \ncapable of running (or being interrupted) for at least two hours. \n \n3.573.69 \nOperational Control. The rights of the CAISO under the \nTransmission Control Agreement and the CAISO Tariff to direct Participating \nTOs how to operate their transmission lines and facilities and other electric plant \naffecting the reliability of those lines and facilities for the purpose of affording \ncomparable nondiscriminatory transmission access and meeting Applicable \nReliability Criteria. \n \n3.583.70 \nOriginal Participating TO. A Participating TO that was a \nParticipating TO as of January 1, 2000. The Original Participating TOs are \nPacific Gas and Electric Company, Southern California Edison Company, and \nSan Diego Gas & Electric Company. \n \n3.593.71 \nParticipating TO (“PTO”). A party to the TCA whose application \nunder Section 2.2 of the TCA has been accepted and who has placed, or expects to \nplace, its transmission assets and/or Entitlements under the CAISO’s Operational \nControl in accordance with the TCA. A PTO may be an Original Participating TO"},{"page":181,"startToken":66944,"endToken":67401,"text":"13 \nLS Power GridLSPGC TO Tariff \n \n \nor a New Participating TO. For the purposes of this Tariff, the Participating TO is \nLS Power GridLSPGC. \n \n3.603.72 \nPhysical Scheduling Plant. A group of two or more related \nGenerating Units each of which is individually capable of producing Energy, but \nwhich either by physical necessity or operational design must be operated as if \nthey were a single Generating Unit and any Generating Unit or Units containing \nrelated multiple generating components which meet one or more of the \nfollowing criteria: (i) multiple generating components are related by a common \nflow of fuel which cannot be interrupted without substantial loss of efficiency of \nthe combined output of all components; (ii) the Energy production from one \ncomponent necessarily causes Energy production from other components; (iii) \nthe operational arrangement of related multiple generating components \ndetermines the overall physical efficiency of the combined output of all \ncomponents; (iv) the level of coordination required to schedule individual \ngenerating components would cause the CAISO to incur scheduling costs far in \nexcess of the benefits of having scheduled such individual components \nseparately; or (v) metered output is available only for the combined output of \nrelated multiple generation components and separate generating component \nmetering is either impractical or economically inefficient. \n \n3.73 \nPoint of Withdrawal. Point(s) within the CAISO Balancing Authority Area, or \nfor purposes of scheduling and operating the Day Ahead Market only, the EDAM \nArea where Energy and Ancillary Services are made available to a receiving party \nunder the CAISO Tariff, for purposes of scheduling and operating the Real-Time \nMarket only, the EIM Area where Energy and Ancillary Services are made \navailable to a receiving party under the CAISO Tariff, or for purposes of the \ndefinition of Large Load only, the point(s) where a non-transmission facility that \nis used to withdraw Energy from the CAISO Controlled Grid to serve an End-\nUser connects to the CAISO Controlled Grid. \n \n3.613.74 \nProjects.  LS Power GridLSPGC’s interest in the approximately       \n850 megavar (“MVAR”) static synchronous condenser (“STATCOM”) project to \nbe located in Fresno County, California interconnected to the PG&E Gates \nSubstation, and LS Power GridLSPGC’s interest in the approximately       530 \nMVAR STATCOM facility and associated 500 kilovolt (“kV”) switchyard to be \nlocated in Shasta County, California, interconnected to the PG&E Round \nMountain to Table Mountain 500 kV transmission lines. \n \n3.623.75 \nProject Proponent. A Market Participant or group of Market \nParticipants that (i) advocates a transmission addition or upgrade; (ii) is unwilling \nto pay the full cost of the proposed transmission addition or upgrade, and thus is \nnot a Project Sponsor; and (iii) initiates proceedings under the CAISO ADR \nProcedures to determine the need for the proposed transmission addition or \nupgrade."},{"page":182,"startToken":67401,"endToken":67836,"text":"14 \nLS Power GridLSPGC TO Tariff \n \n \n3.633.76 \nProject Sponsor. A Market Participant or group of Market Participants \nor a Participating TO that proposes the construction of a transmission addition or \nupgrade in accordance with Section 24 of the CAISO Tariff. \n3.643.77 \nRegional Access Charge.  A component of the Access Charge \ndetermined by the CAISO under Section 26.1 of the CAISO Tariff. \n \n3.653.78 \nRegional Transmission Facility. A transmission facility under the \nOperational Control of the CAISO that is owned by the Participating TO or to \nwhich the Participating TO has an Entitlement that may be associated with a \nConverted Right, which operates at a voltage at or above 200 kilovolts, and \nsupporting facilities, and the costs of which are not directly assigned to one or \nmore specific customers. \n \n3.663.79 \nRegional Transmission Group (“RTG”). A voluntary organization \napproved by FERC and composed of transmission owners, transmission users, \nand other entities, organized to efficiently coordinate the planning, expansion, and \nuse of transmission on a regional and inter-regional basis. \n3.673.80 \nRegional Transmission Revenue Requirement. The portion of the \nParticipating TO’s TRR associated with and allocable to the Participating TO’s \nRegional Transmission Facilities and Rights associated with Regional \nTransmission Facilities. \n \n3.683.81 \nRegional Utility-Specific Rate. The Participating TO’s Regional \nTransmission Revenue Requirement divided by the Participating TO’s forecast of \nits Gross Load. \n \n3.693.82 \nRegional Wheeling Access Charge. The Wheeling Access Charge \nassessed by the CAISO associated with the recovery of the Participating TO’s \nRegional Transmission Revenue Requirement in accordance with Section 26.1 of \nthe CAISO Tariff. \n \n3.703.83 \nRegulation. The service provided either by Generating Units certified \nby the CAISO as equipped and capable of responding to the CAISO’s direct \ndigital control (AGC) signals, or by System Resources that have been certified by \nthe CAISO as capable of delivering such service to the CAISO Balancing \nAuthority Area, in an upward and downward direction to match, on a Real Time \nbasis, Demand and resources, consistent with established NERC and WECC \nreliability standards, including any requirements of the Nuclear Regulatory \nCommission. Regulation is used to control the Power output of electric generators \nwithin a prescribed area in response to a change in system frequency, tie-line \nloading, or the relation of these to each other so as to maintain the target system \nfrequency and/or the established interchange with other Balancing Authority \nAreas within the predetermined Regulation Limits. Regulation includes both the \nincrease of output by a Generating unit or System Resource (Regulation Up) and \nthe decrease in output by a Generating unit or System Resource (Regulation"},{"page":183,"startToken":67836,"endToken":68208,"text":"15 \nLS Power GridLSPGC TO Tariff \n \n \nDown). Regulation Up and Regulation Down are distinct capacity products, with \nseparately stated requirements and ASMPs in each Settlement Period. \n \n3.713.84 \nRegulatory Authority. The Federal Energy Regulatory Commission. \n \n3.723.85 \nReliability Criteria. Pre-established criteria that are to be \nfollowed in order to maintain desired performance of the CAISO Controlled \nGrid under contingency or steady state conditions. \n \n3.733.86 \nReliability Upgrade. The transmission facilities, other than Direct \nAssignment Facilities, beyond the first point of Interconnection necessary to \ninterconnectaccomplish a New Facility or wholesale Load TSWL \nInterconnection safely and reliably to the CAISO Controlled Grid, which \nwould not have been necessary but for the Interconnection of a New Facility or \nwholesale LoadTSWL Interconnection, including network upgrades necessary \nto remedy short circuit or stability problems resulting from the Interconnection \nof the new Facility or wholesale Load to the CAISO Controlled GridTSWL \nInterconnection. Reliability Upgrades also include, consistent with WECC \npractice, the facilities necessary to mitigate any adverse impact a New \nFacility’s or wholesale Load’s TSWL Interconnection may have on a path’s \nWECC path rating. Reliability Upgrades shall be specified in the \nInterconnection Agreement that governs Interconnection service a TSWL \nInterconnection and shall be subject to FERC approval. \n \n3.743.87 \nRequestsRequest for Expedited Interconnection Procedures.  \nA written request by which an applicant for TSWL Interconnection can request \nexpedited processing of its TSWL Interconnection Application. \n \n3.753.88 \nScheduling Coordinator. An entity certified by the CAISO \nfor the purpose of undertaking the functions specified in Section 4.5 of the \nCAISO Tariff. \n \n3.763.89 \nScheduling Point. A location at which the CAISO Controlled Grid \nor a transmission facility owned by a Transmission Ownership Right holder is \nconnected, by a group of transmission paths for which a physical, non-\nsimultaneous transmission capacity rating has been established for Congestion \nManagement, to transmission facilities that are outside the CAISO’s Operational \nControl. \n \n3.90 \nSite Control. An ECLL may demonstrate that its Large Load Customer has Site \nControl by: \n(a) \nan option for a lease or an executed lease for real property of sufficient \nsize to house the Large Load; or \n(b) \nan option to purchase or title to real property of sufficient size to house the \nLarge Load."},{"page":184,"startToken":68208,"endToken":68576,"text":"16 \nLS Power GridLSPGC TO Tariff \n \n \n3.773.91 \nSpinning Reserve. The portion of unloaded synchronized \ngenerating capacity that is immediately responsive to system frequency and \nthat is capable of being loaded in ten minutes, and that is capable of running \nfor at least two hours. \n \n3.783.92 \nSystem Impact Study. An engineering study conducted to \ndetermine whether a request for Interconnection to the CAISO Controlled Grid \nwould require new transmission additions, upgrades, or other mitigation \nmeasures. \n \n3.793.93 \nSystem Impact Study Agreement. An agreement between a \nParticipating TO and an entity that has requested Interconnection to the \nParticipating TO’s transmission system pursuant to which the entity \nrequesting Interconnection agrees to reimburse the Participating TO for the \ncost of performing or reviewing a System Impact Study. \n \n3.803.94 \nTO Tariff. This Transmission Owner Tariff, as it may be amended or \nsuperseded. \n \n3.813.95 \nTransmission Control Agreement (“TCA”). The agreement \nbetween the CAISO and Participating TOs establishing the terms and conditions \nunder which TOs will become Participating TOs and how the CAISO and each \nParticipating TO will discharge its respective duties and responsibilities, as may \nbe modified from time to time. \n \n3.823.96 \nTransmission Owner (“TO”).  An entity owning transmission \nfacilities or having firm contractual rights to use transmission facilities. \n \n3.833.97 \nTransmission Revenue Balancing Account (“TRBA”).  A \nmechanism established by the Participating TO which will ensure that all \nTransmission Revenue Credits and other credits specified in the CAISO Tariff, \nand all amounts that a Cost Recovery Agreement requires to be credited through \nthe TRBAA, flow through to CAISO Tariff and TO Tariff transmission \ncustomers. \n \n3.843.98 \nTransmission Revenue Balancing Account Adjustment \n(“TRBAA”).  A mechanism established by the Participating TO which will \nensure that all Transmission Revenue Credits and other credits specified in \nSectionSections 6 and 8 of Appendix F, Schedule 3 of the CAISO Tariff, and all \namounts that a Cost Recovery Agreement requires to be credited through the \nTRBAA, flow through to CAISO Tariff and TO Tariff transmission customers. \n \n3.853.99 \nTransmission Revenue Credit. The proceeds received from the \nCAISO (other than for the recovery of the Participating TO’s Regional \nTransmission Revenue Requirement through the Regional Transmission Access \nCharges)."},{"page":185,"startToken":68576,"endToken":68988,"text":"17 \nLS Power GridLSPGC TO Tariff \n \n \n \n3.863.100 \nTransmission Revenue Requirement (“TRR’). The total annual \nauthorized revenue requirement associated with 1) transmission facilities and \nEntitlements turned over to the Operational Control of the CAISO by the \nParticipating TO or 2) the transmission facilities that are not yet in operation, but \nhave been approved under Section 24 and assigned to an Approved Project \nSponsor. The costs of any transmission facility turned over to the Operational \nControl of the CAISO shall be fully included in the Participating TO’s TRR.  The \nTRR includes the costs of transmission facilities and Entitlements and deducts \nTransmission Revenue Credits and is shown in Appendix I. \n \n3.101 Transmission System Wholesale Load (“TSWL”) Interconnection. The \ninterconnection of the transmission facilities of the Participating TO to the \ntransmission facilities of a Transmission Owner, electric utility, or other entity \neligible to request interconnection. A TSWL Interconnection does not include a \nGenerator Interconnection or an ECLL Interconnection. \n \n3.102 TSWL Interconnection Application. An application that requests a TSWL \nInterconnection to the CAISO Controlled Grid, including any modifications to \nexisting points of interconnection. \n \n3.873.103 \nUncontrollable Force. Any act of God, labor disturbance, act of the \npublic enemy, war, insurrection, riot, fire, storm, flood, earthquake, explosion, \nany curtailment, order, regulation or restriction imposed by governmental, \nmilitary or lawfully established civilian authorities or any other cause beyond the \nreasonable control of the CAISO, a Market participant, or the Participating TO, as \nthe case may be, which could not be avoided through the exercise of Good Utility \nPractice. \n \n3.883.104 \nUtility Distribution Company (“UDC”).  An entity that owns a \nDistribution System for the delivery of Energy to and from the CAISO Controlled \nGrid, and/or that provides regulated retail electric service to End-Users. \n \n3.893.105 \nVoltage Support. Services provided by Generating Units or other \nequipment such- as shunt capacitors, static vatvar compensators, or synchronous \ncondensers that are required to maintain established grid voltage criteria. This \nservice is required under normal or system emergency conditions. \n \n3.903.106 \nWestern Electricity Coordinating Council (“WECC”).  The \nWestern Electricity Coordinating CounselCouncil or its successor. \n \n3.913.107 \nWheeling Access Charge. The charge assessed by the CAISO that \nis paid by a Scheduling Coordinator for Wheeling in accordance with Section \n26.1of 26.1 of the CAISO Tariff. Wheeling Access Charges shall not apply for \nWheeling under a bundled non-economy Energy coordination agreement of a \nParticipating TO executed prior to July 9, 1996. The Wheeling Access Charge"},{"page":186,"startToken":68988,"endToken":69444,"text":"18 \nLS Power GridLSPGC TO Tariff \n \n \nconsists of a Regional Wheeling Access Charge and, if applicable, a Local \nWheeling Access Charge. \n \n3.923.108 \nWheeling Out. Except for Existing Rights exercised under an \nExisting Contract in accordance with Section 16.1 of the CAISO Tariff, the use \nof the CAISO Controlled Grid for the transmission of Energy from a \nGenerating Unit located within the CAISO Controlled Grid to serve a Load \nlocated outside the transmission and Distribution System of a Participating TO. \n \n3.933.109 \nWheeling Through. Except for Existing Rights exercised under \nan Existing Contract in accordance with Section 16.1 of the CAISO Tariff, the \nuse of the CAISO Controlled Grid for the transmission of Energy from a \nresource located outside the CAISO Controlled Grid to serve a Load located \noutside the transmission and Distribution System of a Participating TO. \n \n3.943.110 \nWheeling. Wheeling Out or Wheeling Through. \n \n3.953.111    \nWholesale Customer. A person wishing to purchase Energy and \nAncillary Services at a Bulk Supply Point or a Scheduling Point for resale. \n \n4. \nEligibility for Service. Transmission service over a Participating TO’s system shall be \nprovided only to Eligible Customers for transmission service under the CAISO Tariff.  Any \ndispute as to whether an entity that resells power is eligible for an interconnection under this TO \nTariff shall be resolved by the FERC. Any dispute as to whether an End-User is eligible for an \ninterconnection under this TO Tariff will be resolved by the Local Regulatory Authority. to \nEligible Customers as defined by the CAISO Tariff.  Any dispute as to whether a customer is \neligible for service under this TO Tariff shall be resolved by the FERC. \n \n5. \nAccess Charges and Transmission Rates. The applicable Access Charges are \nprovided in the CAISO Tariff. \n \n5.1 \nWheeling Access Charge. The Wheeling Access Charge shall be determined in \naccordance with the CAISO Tariff. The Wheeling Access Charge assessed by the \nCAISO consists of a Regional Wheeling Access Charge and, if applicable, a \nLocal Wheeling Access Charge.  Wheeling revenues are disbursed by the CAISO \nto Participating TOs pursuant to Section 26.1.4.3 of the CAISO Tariff. \n \n5.2 \nTransmission Revenue Requirement.  Appendix F, Schedule 3, Section 6 of the \nCAISO Tariff provides the Transmission Revenue Requirement for each \nParticipating TO to be used to develop the Access Charges. LS Power \nGridLSPGC’s TRR is set forth in Appendix I. \n \n5.3 \nTransmission Revenue Balancing Account Adjustment (“TRBAA”). The \nParticipating TO shall maintain a Transmission Revenue Balancing Account with \nan annual TRBAA that will ensure that all Transmission Revenue Credits and \nadjustments for any over-or under-recovery of its annual Transmission Revenue \nRequirement, if any, specified in Sections 6, 8 and 13 of Appendix F, Schedule 3"},{"page":187,"startToken":69444,"endToken":69841,"text":"19 \nLS Power GridLSPGC TO Tariff \n \n \nof the CAISO Tariff, flow through to transmission customers. The TRBAA used \nto calculate the Regional Transmission Revenue Requirement shall include other \nadjustments specified in Appendix F, Schedule 3, Sections 6, 8 and 13 of the \nCAISO Tariff. The TRBAA shall also ensure that all amounts that a Cost \nRecovery Agreement requires to be credited to transmission customers through \nthe TRBAA flow through to transmission customers. \n \nThe TRBAA shall be equal to: \nTRBAA = Cr + Cf + I \nWhere: \n \nCr =  The principal balance in the Transmission Revenue Balancing Account \n(“TRBA”) recorded in FERC Account No. 254 as of September 30 of the \nyear prior to commencement of the January billing cycle. This balance \nrepresents the unamortized balance in the TRBA from the previous \nperiod and the difference in the amount of revenues or expenditures from \nTransmission Revenue Credits , amounts recorded in the TRBA under \nany Cost Recovery Agreement, and any over- or under-recovery of its \nannual Transmission Revenue Requirement and the amount of such \nrevenues or expenditures that has been refunded to or collected from \ncustomers through operation of the TRBAA; \n \nCf =  The forecast of Transmission Revenue Credits, if any, for the \nfollowing calendar year, plus any forecast credit that a Cost Recovery \nAgreement requires to be included in the TRBAA for the following \ncalendar year; \n \nI =  \nThe interest balance for the TRBA, which shall be calculated using the \ninterest rate pursuant to Section 35.19(a)35.19a of FERC’s regulations \nunder the Federal Power Act (18 CFR Section 35.19(a35.19a)). Interest \nshall be calculated based on the average TRBA principal balance each \nmonth, compounded quarterly. Amounts recorded in the TRBA under any \nCost Recovery Agreement shall be included in the TRBA principal \nbalance for purposes of this calculation. Nothing in this Section 5.3 \nrequires the payment of interest between the Participating TO and a party \nto a Cost Recovery Agreement on amounts payable or refundable under \nthat agreement, which shall be governed solely by the terms of the Cost \nRecovery Agreement; and \n \nThe LS Power GridLSPGC TRBAA, calculated in accordance with the \nCAISO Tariff and approved by the FERC in accordance with Appendix F, \nSchedule 3, Section 9, is stated in Appendix I.  To ensure the TRBA is \neffective each January 1, LS Power GridLSPGC shall file the TRBAA no \nlater than October 15th of each calendar year."},{"page":188,"startToken":69841,"endToken":70278,"text":"20 \nLS Power GridLSPGC TO Tariff \n \n \n6. \nAncillary Services - Applicability and Charges. Ancillary Services are needed to \nmaintain reliability within the CAISO Controlled Grid. If any Ancillary Services are \nrequired, LS Power GridLSPGC will not provide such services directly to the \ntransmission customer and the transmission customer will be required to meet any such \nrequirement in accordance with the CAISO Tariff. \n \n7. \nBilling and Payment. \n \n7.1 \nThe CAISO, in accordance with the CAISO Tariff, shall pay the Participating \nTO, among other things, all applicable Access Charge revenues and Wheeling \nrevenues in connection with the Project and any other transmission facility \nowned by the Participating TO and placed under the operational control of the \nCAISO. \n \n7.2 \nUsers of LS Power GridLSPGC’s Regional Transmission Facilities and \nEntitlements placed under the CAISO’s Operational Control shall pay to the \nCAISO all applicable charges in accordance with the CAISO Tariff.   \n \n8. \nObligation to Interconnect or Construct Transmission Expansions and Facility \nUpgrades.  Unless LS Power GridLSPGC is the lead Participating TO with respect to \nan Interconnection, the provisions of Section 8 of this TO Tariff, and its subparts, shall \nhave no application to the Project or any other Regional Transmission Facilities, or \nEntitlements turned over to the CAISO’s operational control by LS Power GridLSPGC, \nand the corresponding provisions of the lead Participating TO’s TO Tariff shall govern. \n \n8.1 \nParticipating TO Obligation to Interconnect. The Participating TO shall, at \nthe request of a third party, interconnect its system to the wholesale Generating \nFacility or Load of such third party, or modify an existing wholesale \nInterconnection. Interconnections under this TO Tariff shall be available to \nentities eligible to request Interconnection consistent with the provisions of \nSection 210(a) of the FPA. The procedures for the Interconnections of Load to \nthe CAISO Controlled Grid shall be governed by this TO Tariff and the CAISO \nTariff. The procedures for Interconnection of wholesale Generating Facilities to \nthe CAISO Controlled Grid shall be governed by the CAISO Tariff. \n \n8.1.1 Interconnection to Transmission System. Interconnection Any \ninterconnection must be consistent with Good Utility Practice, in \nconformance with all Applicable Reliability Criteria, all applicable \nstatutes, regulations, and CAISO reliability criteria for the CAISO \nControlled Grid. The Participating TO will not accommodate the \nInterconnectioninterconnection if doing so would impair systems \nreliability, or would otherwise impair the ability of the Participating TO \nto honor its Encumbrances existing as of the time an entity submits its \nInterconnection Applicationinterconnection application. The \nParticipating TO shall identify any such adverse effect on its \nEncumbrances in the System Impact Study performed pursuant to \nSection 10.7interconnection studies. To the extent the Participating TO"},{"page":189,"startToken":70278,"endToken":70703,"text":"21 \nLS Power GridLSPGC TO Tariff \n \n \ndetermines that the Interconnectioninterconnection will have an \nadverse effect on Encumbrances, the party requesting \nInterconnectioninterconnection shall mitigate such adverse effect. \n \n8.1.1.1 Letter Agreement for Generator Interconnections. Pursuant to \nSection 12 of Appendix DD or KK of the CAISO Tariff, prior to \nexecuting a Generator Interconnection Agreement, a party seeking a \nGenerator Interconnection may, in order to advance the implementation \nof its Generator Interconnection, request, and the Participating TO shall \noffer the party, a Letter Agreement that authorizes the Participating TO \nto begin engineering, design, and procurement of long lead-time items, \nor construction necessary for the establishment of the Generator \nInterconnection. However, the Participating TO shall not be obligated \nto offer a Letter Agreement if the party seeking Generator \nInterconnection is in Dispute Resolution as a result of an allegation that \nthe party seeking Generator Interconnection has failed to meet any \nmilestones or comply with any prerequisites specified in the CAISO \nTariff. The Letter Agreement is an optional procedure. The Letter \nAgreement shall provide for the party seeking Generator \nInterconnection to pay the cost of all activities authorized by the party \nand to make advance payments or provide other satisfactory security \nfor such costs. \n \n \nFollowing a party seeking Generator Interconnection’s request for a \nLetter Agreement, the Participating TO shall prepare and tender to the \nparty seeking Generator Interconnection a draft Letter Agreement, \nincluding draft exhibits that include the proposed scope of work, \nestimated costs, payments, financial security and milestones, as \napplicable. The party seeking Generator Interconnection shall provide \nwritten comments, or notification of no comments, to the draft exhibits \nwithin thirty (30) Calendar Days. The Participating TO and the party \nseeking Generator Interconnection shall negotiate concerning any \ndisputed provisions of the exhibits to the draft Letter Agreement for not \nmore than ninety (90) Calendar Days after the Participating TO tenders \nthe draft Letter Agreement to the party seeking Generator \nInterconnection. If the party seeking Generator Interconnection \ndetermines that negotiations are at an impasse, it may request \ntermination of the negotiations at any time after tender of the draft \nLetter Agreement and request submission of the unexecuted Letter \nAgreement with FERC or initiate dispute resolution procedures \npursuant to Section 14 of this TO Tariff. If the party seeking Generator \nInterconnection requests termination of the negotiations, but within \nninety (90) Calendar Days after the Participating TO tenders the draft \nLetter Agreement to the party seeking Generator Interconnection, fails \nto request either the filing of the unexecuted Letter Agreement or \ninitiate dispute resolution procedures, it shall be deemed to have"},{"page":190,"startToken":70703,"endToken":71116,"text":"22 \nLS Power GridLSPGC TO Tariff \n \n \nwithdrawn its request for a Letter Agreement and the Participating TO \nshall have no further obligation to enter into a Letter Agreement, unless \nan extension is mutually agreed to by the parties. The Participating TO \nshall provide to the party seeking Generator Interconnection a final \nLetter Agreement within fifteen (15) Business Days after the \ncompletion of the negotiation process. \n \n \nFollowing submission of the final Letter Agreement to the party \nseeking Generator Interconnection, the party shall either: (i) execute \ntwo originals of the tendered Letter Agreement and return them to the \nParticipating TO; or (ii) request in writing that the Participating TO file \nwith FERC a Letter Agreement in unexecuted form. As soon as \npracticable, but not later than ten (10) Business Days after receiving \neither the two executed originals of the tendered Letter Agreement or \nthe request to file an unexecuted Letter Agreement, the Participating \nTO shall file the Letter Agreement with FERC, together with its \nexplanation of any matters as to which the party seeking Generator \nInterconnection and the Participating TO disagree and support for the \ncosts that the Participating TO proposes to charge to the party seeking \nGenerator Interconnection under the Letter Agreement. An unexecuted \nLetter Agreement should contain terms and conditions deemed \nappropriate by the Participating TO for the Generator Interconnection \nrequest. \n \n \nIf the party seeking Generator Interconnection executes the final Letter \nAgreement, the Participating TO and the party seeking Generator \nInterconnection shall perform their respective obligations in accordance \nwith the terms of the Letter Agreement, subject to modification by \nFERC. Upon submission of an unexecuted Letter Agreement, the party \nseeking Generator Interconnection and the Participating TO shall \npromptly comply with the unexecuted Letter Agreement, subject to \nmodification by FERC. \n \n8.1.2 Costs Associated with Interconnection. Each party requesting \nInterconnection shall pay the costs of planning, installing, owning, \noperating, and maintaining any Direct Assignment Facilities and, if \napplicable, any Reliability Upgrades required to provide the requested \nInterconnection, except as provided in Appendix DD of the CAISO \nTariff. In addition, such party shall implement all existing operating \nprocedures necessary to safely and reliabilityreliably interconnect such \nparty’s Generating Facility or wholesale Load to the facilities of the \nParticipating TO and to ensure the CAISO Controlled Grid’s \nconformance with the CAISO Grid Planning Criteria, and shall bear all \ncosts of implementing such operating procedures, except as provided in \nAppendix DD of the CAISO Tariff. Any additional costs associated \nwith accommodating the Interconnection shall be allocated in"},{"page":191,"startToken":71116,"endToken":71535,"text":"23 \nLS Power GridLSPGC TO Tariff \n \n \naccordance with the cost responsibility methodology set forth in the \nCAISO Tariff for transmission expansions or upgrades. \n \n8.1.3 Interconnection Agreement. Pursuant to Section 24 and Appendix DD of \nthe CAISO TariffInterconnection Agreements shall be tendered, executed, \na party requesting an Interconnection shall request in writing that the \nParticipating TO tender to CAISO and such party an Interconnection \nAgreement that will be filed with FERC.  Such Interconnection request \nwill be subject to the terms as provided in Sections 10.9 and conditions set \nfor in the CAISO Tariff10A.3. \n \n8.1.4 Due Diligence to Construct. The Participating TO shall use due \ndiligence to construct, within a reasonable time, any Direct Assignment \nFacilities and any Reliability Upgrades that it is obligated to construct \npursuant to this TO Tariff and Section 24 and Appendix DD of the \nCAISO Tariff. The Participating TO’s obligation to build will be subject \nto: (1) its ability, after making a good faith effort, to obtain any \nnecessary approvals and property rights under applicable federal, state, \nand local laws; (2) the presence of a cost recovery mechanism with cost \nresponsibility assigned in accordance with the CAISO Tariff or \napplicable FERC precedent; and (3) a signed Interconnection \nAgreement, Engineering and Procurement Agreement, or, by mutual \nagreement of the parties, FERC acceptance for filing of an unexecuted \nInterconnection Agreement. \n \n8.1.5 Energization. The Participating TO shall not be obligated to energize, \nnor shall the applicant or wholesale load be entitled to have its \ninterconnection to the CAISO Controlled Grid energized, unless and \nuntil an Interconnection Agreement has been executed, or filed at \nFERC pursuant to Section 8.1.3, and become effective and such \napplicant or wholesale load has demonstrated to the CAISO’s \nreasonable satisfaction that it has complied with all of the requirements \nof the CAISO Tariff and the requirements of this TO Tariff. \n \n8.1.6 Coordination with CAISO on Interconnection Requests. The \nParticipating TO shall coordinate with the CAISO, pursuant to the \nprovisions of the TCA and CAISO Tariff.   \n \n8.2 \nParticipating TO Obligation to Construct Transmission Expansions or \nFacility Upgrades. The Participating TO shall be obligated to build transmission \nadditions and facility upgrades where the Participating TO is obligated to \nconstruct or expand facilities in accordance with and subject to the limitations \nunder Section 24 of the CAISO Tariff and this TO Tariff. \n \n8.2.1 Obligation to Construct. A Participating TO shall not be obligated to \nconstruct or expand transmission facilities or system upgrades unless"},{"page":192,"startToken":71535,"endToken":71982,"text":"24 \nLS Power GridLSPGC TO Tariff \n \n \nand until the conditions stated in Section 9.2.1 hereof have been \nsatisfied. \n \n8.3 \nRequest for FERC Deference Regarding Need Determination. It is intended \nthat FERC grant substantial deference to the factual determinations of the \nCAISO, (including the CAISO’s ADR Procedures), the CPUC, WECC, or RTG \ncoordinated planning processes as to the need for or construction of a facility, the \nneed for full cost recovery, endand the allocation of costs. \n \n9. \nExpansion Participating TO Process for Construction or Expansion of \nTransmission Facilities.  Unless LS Power GridLSPGC is the lead Participating TO \nwith respect to a required system expansion, the provisions of Section 9 of this TO \nTariff, and its subparts, shall have no application to the Project or any other Regional \nTransmission Facilities, Local Transmission Facilities, or Entitlements turned over to the \nCAISO’s operational control by LS Power Grid and the corresponding provisions of the \nlead Participating TO’s TO Tariff shall govern. Facilities, Local Transmission Facilities, \nor Entitlements turned over to the CAISO’s operational control by LS Power \nGridLSPGC and the corresponding provisions of the lead Participating TO’s TO Tariff \nshall govern. \n \n9.19.1 Applicability and  \nDetermination of Facilities. A Participating TO shall \nperform a study in accordance with the Section where the Participating TO is \nobligated to construct or expand facilities in accordance with Section 24 and \nAppendix DD of the CAISO Tariff and this TO Tariff (other than if the \nobligation to expand or construct is pursuant to Section 10 or 10A of this TO \nTariff or the CAISO’s generator interconnection procedures). \n \n9.2 \nObligation to Build. \n \n9.2.1 Due Diligence to Construct. Subject to Section 9.3.3 of this TO Tariff, \nthe Participating TO shall use due diligence to construct, within a \nreasonable time, additions or upgrades to its transmission system that it \nis obligated to construct pursuant to the CAISO Tariff and this TO \nTariff.  \n \n9.2.2 Delay in Construction or Expansion. If any event occurs that will \nmaterially affect the time for completion of new facilities, or the ability \nto complete them, the Participating TO shall promptly notify the CAISO \nwith regard to facilities determined to be needed.  The Participating TO \nalso shall make available to such Project Sponsor and the CAISO, as the \ncase may be, studies related to the cause and extent of the delay and the \nParticipating TO’s ability to complete the new facilities, and evaluate \nany options available. The Participating TO also shall make available to \nsuch Project Sponsor and the CAISO, as the case may be, studies \nreasonably needed to evaluate the alternatives. \n \n9.3 \nProvisions Relating To Transmission Construction On the System Of Other"},{"page":193,"startToken":71982,"endToken":72418,"text":"25 \nLS Power GridLSPGC TO Tariff \n \n \nTOs.  A Participating TO shall not be responsible for making arrangements for \nany engineering, permitting, and construction of transmission or distribution \nfacilities on the system(s) of any other entity or for obtaining any regulatory \napproval for such facilities.  The Participating TO will undertake reasonable \nefforts through the coordinated planning process to assist in making such \narrangements, including, without limitation, providing any information or data \nrequired by such other electric system pursuant to Good Utility Practice. \n \n10. \nTSWL  \nInterconnection Process.  All requests for TSWL Interconnection \ndirectly to with the CAISO Controlled Grid from parties eligible Projects or any other Regional \nTransmission Facilities, or Entitlements turned over to request such Interconnection the \nCAISO’s operational control by LS Power Grid shall be processed pursuant directed to the \nprovisions of the CAISO TariffParticipating TO. \n \n10.1 \nApplicability. All requests for TSWL Interconnection directly to the CAISO \nControlled Grid from parties eligible to request such Interconnection consistent \nwith Section 210(a) of the FPA shall be processed pursuant to the provisions of \nthis Section 10. All requests for Interconnection of wholesale generation directly \nto the CAISO Controlled Grid shall be processed pursuant to the provisions of the \nCAISO Tariff. Requests for interconnection submitted by an ECLL on behalf of \nLarge Load Customers shall be processed pursuant to Section 10A of this TO \nTariff. \n \n10.2 \nTSWL Interconnection Applications. An applicant requesting TSWL \nInterconnection shall submit a written TSWL Interconnection Application which \nprovides the information detailed below to the Participating TO. The Participating \nTO shall timestamp the application to establish study priority. \n(i) \nthe identity, address, telephone number, and email of the applicant \nrequesting TSWL Interconnection; \n(ii) \nthe Interconnection point(s) to the CAISO Controlled Grid contemplated \nby the applicant; \n(iii) \nthe resultant (or new) maximum amount of TSWL Interconnection \ncapacity contemplated by the applicant; \n(iv) \nthe proposed date for energizing the TSWL Interconnection and the term \nof the interconnection service; and \n(v) \nsuch other information as the Participating TO reasonably requires to \nprocess the application. \n \nIn addition to the information specified above, the following information may also \nbe provided in order to properly evaluate system conditions: \n(vi) \nIf the applicant is a wholesale load, the electrical location of the source of \nthe power (if known) to be transmitted pursuant to applicant’s request for \nInterconnection. If the source of the power is not known, a system \npurchase will be assumed. If the location of the load is not known, a \nsystem sale will be assumed; and, in addition, if an applicant proposes to \nperform or cause a third party to perform any required System Impact"},{"page":194,"startToken":72418,"endToken":72839,"text":"26 \nLS Power GridLSPGC TO Tariff \n \n \nStudy or any required Facilities Study, it shall so indicate in its TSWL \nInterconnection Application. The results of any study or studies performed \nby an applicant must be approved by both the CAISO and the Participating \nTO. \n \nWithin ten (10) Business Days after receipt of a TSWL Interconnection \nApplication, the Participating TO and the CAISO if applicable shall determine \nwhether the application is complete (“Completed TSWL Interconnection \nApplication”). Whenever possible, the Participating TO will attempt to remedy \ndeficiencies in the TSWL Interconnection Application through informal \ncommunications with the applicant. If such efforts are unsuccessful, the \nParticipating TO shall return the TSWL Interconnection Application to the \napplicant. \n \nThe Participating TO will treat the information in the TSWL Interconnection \nApplication, including the applicant’s identity, as confidential at the request of the \napplicant except to the extent that disclosure of the information is required by this \nTO Tariff, by regulatory or judicial order, for reliability purposes pursuant to \nGood Utility Practice, or pursuant to RTG or CAISO transmission information \nsharing agreements. The Participating TO shall treat this information consistent \nwith the standards of conduct contained in Part 37 of FERC’s regulations. \n \n10.2.1 Amendment to Completed TSWL Interconnection Application. An \napplicant shall only be limited to amending its Completed TSWL \nInterconnection Application once. Such amendment shall occur on or \nbefore ten (10) Business Days following the date the Participating TO \ntenders any Facilities Study Agreement. Specifically, an applicant may \nsubmit an amendment to its Completed TSWL Interconnection \nApplication to reflect a revised configuration for its New Facility. The \namended Completed TSWL Interconnection Application shall be treated in \naccordance with Section 25 of the CAISO Tariff and Section 10.4 of this \nTO Tariff; the applicant’s Completed TSWL Interconnection Application \nshall be deemed withdrawn; and the applicant shall maintain its existing \nqueue position, if (a) the amended Completed TSWL Interconnection \nApplication is received by the Participating TO within ten (10) Business \nDays of the Participating TO’s tender of a Facilities Study Agreement; and \n(b) the applicant has not submitted a previous amendment to the \nCompleted TSWL Interconnection Application. In the event an applicant \namends its Completed TSWL Interconnection Application, it will be \nresponsible for any additional study costs that result from that amendment, \nincluding costs associated with revisions to studies for other applicants \nholding later queue positions. \n \n10.3 \nReview of Completed TSWL Interconnection Application. After receiving a \nCompleted TSWL Interconnection Application, the Participating TO and the \nCAISO, if applicable, will determine on a non-discriminatory basis whether a"},{"page":195,"startToken":72839,"endToken":73333,"text":"27 \nLS Power GridLSPGC TO Tariff \n \n \nSystem Impact Study is required. Whenever the Participating TO, and the CAISO, \nif applicable, determines that a System Impact Study is not required and that \nneither Reliability Upgrades nor changes in existing operating procedures are \nrequired, the Participating TO shall notify the applicant within fifteen (15) \nBusiness Days of the Completed Application Date. If the TSWL Interconnection \ncan be accommodated without any Direct Assignment Facilities, then within \nthirty (30) Business Days of such notice from the Participating TO, the applicant \nshall request the Participating TO to tender to the applicant an Interconnection \nAgreement within thirty (30) Business Days of such request. The Participating TO \nshall tender to the applicant an Interconnection Agreement as provided in Section \n10.9. If the Participating TO determines upon review of the Completed TSWL \nInterconnection Application, that Direct Assignment Facilities are required, the \nParticipating TO shall tender to the applicant a Facilities Study Agreement within \ntwenty (20) Business Days of the Completed Application Date and continue the \nInterconnection process pursuant to Section 10.7. \n \n10.4 \nNotice of Need for System Impact Study. If the Participating TO, and the \nCAISO, if applicable, determines that a System Impact Study is necessary to \naccommodate the requested Interconnection, the Participating TO shall so inform \nthe applicant as soon as practicable. In such cases, the Participating TO shall \nwithin twenty (20) Business Days of receipt of a Completed TSWL \nInterconnection Application, tender a System Impact Study Agreement that \ndefines the scope, content, assumptions and terms of reference for such study to \nbe completed by the Participating TO, the estimated time required to complete it, \nand such other provisions as the parties may reasonably require, and pursuant to \nwhich the applicant shall agree to reimburse the Participating TO for the \nreasonable actual costs of performing the required System Impact Study. A \ndescription of the Participating TO’s transmission assessment practices for \ncompleting a System Impact Study shall be provided in the Participating TO’s \nFERC Form 715. \n \nAlternatively, if the applicant will perform the System Impact Study, the \nParticipating TO shall within twenty (20) Business Days of receipt of a \nCompleted TSWL Interconnection Application, tender a System Impact Study \nAgreement that defines the scope, content, assumptions and terms of reference for \nsuch study to be reviewed by the Participating TO; the estimated time required to \ncomplete it; and such other provisions as the parties may reasonably require, and \npursuant to which the applicant shall agree to reimburse the Participating TO for \nthe reasonable actual costs of reviewing the required System Impact Study. \n \nFor a TSWL Interconnection request to remain a Completed TSWL \nInterconnection Application, the applicant shall execute the System Impact Study \nAgreement and return it to the Participating TO within ten (10) Business Days \ntogether with payment for the reasonable estimated cost of performing the System \nImpact Study or reviewing the applicant’s System Impact Study. Alternatively, if \nthe applicant requests the Participating TO to proceed with the System Impact"},{"page":196,"startToken":73333,"endToken":73818,"text":"28 \nLS Power GridLSPGC TO Tariff \n \n \nStudy or review thereof and commits to abide by the terms, conditions, and cost \nassignments ultimately determined under the CAISO ADR Procedures, including \nany determination by FERC or appeal of a FERC determination in accordance \nwith that process, the Participating TO shall promptly proceed with the System \nImpact Study provided that such request is accompanied by payment of the \nreasonable estimated cost of the System Impact Study, and the parties shall submit \nthe disputed terms for resolution under the CAISO ADR Procedures. If the \napplicant elects not to execute a System Impact Study Agreement, and does not \nrequest that the Participating TO proceed with the System Impact Study or review \nthereof, its application shall be deemed withdrawn, and the applicant shall \nreimburse to the Participating TO all costs reasonably incurred in processing the \napplication. \n \n10.5 \nSystem Impact Study Cost Reimbursement and Agreement. \n \n10.5.1 Cost Reimbursement. The System Impact Study Agreement shall clearly \nspecify the charge, based on the Participating TO’s estimate of the cost \nand time for completion of the System Impact Study. The charge shall not \nexceed the reasonable actual cost of the study. In performing the System \nImpact Study, the Participating TO shall rely, to the extent reasonably \npracticable, on existing transmission planning studies. The applicant will \nnot be assessed a charge for such existing studies; however, the applicant \nwill be responsible for the reasonable charges associated with any \nmodifications to existing planning studies that are reasonably necessary to \nevaluate the impact on the applicant’s request. \n \n10.6 \nSystem Impact Study Procedures. Upon receipt of an executed System Impact \nStudy Agreement or initiation of the CAISO ADR Procedures and receipt of \npayment for estimated study costs, the Participating TO will use due diligence to \neither (a) complete the required System Impact Study within a sixty (60) calendar \nday period or (b) complete its review of an applicant’s System Impact Study \nwithin thirty (30) calendar days of its receipt of the completed study. The System \nImpact Study will identify whether any Direct Assignment Facilities or Reliability \nUpgrades are necessary to deliver a New Facility’s full output over the CAISO \nControlled Grid, or any transmission additions or upgrades are necessary to serve \na wholesale load. The System Impact Study will also identify any adverse impact \non Encumbrances existing as of the applicant’s Completed Application Date. In \nthe event that the Participating TO is unable to complete the required System \nImpact Study within such time period, it shall so notify the applicant, in writing, \nand provide an estimated completion date along with an explanation of the \nreasons why additional time is required to complete the required studies. A copy \nof the completed System Impact Study and related work papers shall be made \navailable to the applicant and the CAISO. The Participating TO shall notify the \napplicant and the CAISO immediately upon completion of the System Impact \nStudy."},{"page":197,"startToken":73818,"endToken":74338,"text":"29 \nLS Power GridLSPGC TO Tariff \n \n \n10.6.1 Procedures Upon Completion of System Impact Study. Within fifteen \n(15) Business Days of completion of the System Impact Study or review \nand approval of an applicant’s System Impact Study, the Participating TO \nshall notify the applicant whether the transmission system will be adequate \nto accommodate all of a request for Interconnection. If no costs are likely \nto be incurred for any Direct Assignment Facilities, any Reliability \nUpgrades, or implementing any operating procedures, then within thirty \n(30) Business Days of receipt of written approval of the applicant’s \nSystem Impact Study from the Participating TO and the CAISO the \napplicant shall request the Participating TO to tender an Interconnection \nAgreement within thirty (30) Business Days of such request. The \nParticipating TO shall tender to the applicant an Interconnection \nAgreement as provided in Section 10.9. If costs are likely to be incurred to \naccommodate a request for Interconnection, the Participating TO shall \ntender to the applicant a Facilities Study Agreement pursuant to Section \n10.7. \n \n10.7 \nNotice of Need for Facilities Study. If a System Impact Study indicates that \nadditions or upgrades to the CAISO Controlled Grid are needed to satisfy an \napplicant’s request for interconnection, the Participating TO shall, within fifteen \n(15) Business Days of the date of the System Impact Study or the completion of \nreview and approval of the applicant’s System Impact Study by the Participating \nTO, tender to the applicant a Facilities Study Agreement that defines the scope, \ncontent, assumptions and terms of reference for such study to be completed by the \nParticipating TO; the estimated time required to complete the required study; and \nsuch other provisions as the parties may reasonably require, and pursuant to \nwhich the applicant agrees to reimburse the Participating TO for the reasonable \nactual costs of performing the required Facilities Study. Alternatively, if the \napplicant will perform the Facilities Study, the Participating TO shall within \nfifteen (15) Business Days of the completion date of the System Impact Study or \nthe completion of review and approval of the applicant’s System Impact Study, \ntender a Facilities Study Agreement that defines the scope, content, assumptions \nand terms of reference for such study to be reviewed by the Participating TO; the \nestimated time required to complete the required review; and such other \nprovisions as the parties may reasonably require, and pursuant to which the \napplicant agrees to reimburse the Participating TO for the reasonable actual costs \nof reviewing the required Facilities Study. For a TSWL Interconnection request to \nremain a Completed TSWL Interconnection Application, the applicant shall \nexecute the Facilities Study Agreement and return it to the Participating TO \nwithin ten (10) Business Days together with payment for the reasonable estimated \ncosts of performing the Facilities Study or reviewing the applicant’s Facilities \nStudy. Alternatively, if the applicant requests the Participating TO to proceed \nwith the Facilities Study or review thereof and commits to abide by terms, \nconditions, and cost assignments ultimately determined under the CAISO ADR \nProcedures, including any determination by FERC or appeal of a FERC \ndetermination in accordance with that process, the Participating TO shall"},{"page":198,"startToken":74338,"endToken":74826,"text":"30 \nLS Power GridLSPGC TO Tariff \n \n \npromptly proceed with the Facilities Study provided that such request is \naccompanied by payment for the reasonable estimated cost of the Facilities Study, \nand the parties shall submit the disputed terms for resolution under the CAISO \nADR Procedures. If the applicant elects not to execute a Facilities Study \nAgreement and does not request that the Participating TO proceed with the \nFacilities Study or review thereof, its application shall be deemed withdrawn and \nthe applicant shall reimburse to the Participating TO all costs reasonably incurred \nin processing the application not covered by the System Impact Study Agreement. \n \n10.8 \nFacilities Study Procedures. Upon receipt of an executed Facilities Study \nAgreement or initiation of the CAISO ADR Procedures and receipt of payment \nfor the estimated study costs, the Participating TO will use due diligence to either \n(a) complete the required Facilities Study within a sixty (60) calendar day period \nor (b) complete its review of an applicant’s Facilities Study within thirty (30) \ncalendar days of its receipt of the Completed Study. In the event that Participating \nTO is unable to complete the required Facilities Study within such time period, it \nshall so notify the applicant, in writing, and provide an estimated completion date \nalong with an explanation of the reasons why additional time is required to \ncomplete the required studies. A copy of the completed Facilities Study shall be \nmade available to the applicant. \n \n10.8.1 Tender of Interconnection Agreement. Within thirty (30) Business Days \nof receipt of the completed Facilities Study performed by the Participating \nTO or receipt of written approval of the applicant’s Facilities Study from \nthe Participating TO, the applicant shall request the Participating TO to \ntender an Interconnection Agreement within thirty (30) Business Days of \nsuch request. The Participating TO shall tender to the applicant an \nInterconnection Agreement as provided in Section 10.9. \n \n10.9 \nInterconnection Agreement. Pursuant to Section 10.3, 10.6.1, or 10.8.1, a party \nrequesting TSWL Interconnection shall request in writing that the Participating \nTO tender to such party an Interconnection Agreement that will be filed with \nFERC, or the Local Regulatory Authority, in the case of a Local Publicly Owned \nElectric Utility. The Interconnection Agreement shall include, without limitation, \ncost responsibilities and payment provisions for any engineering, equipment, \nconstruction, ownership, operation and maintenance costs for any Direct \nAssignment Facilities, any Reliability Upgrades, and for any other mitigation \nmeasures. The Interconnection Agreement will set forth a payment schedule that \nenables the Participating TO to recover its costs. \n \nFor a TSWL Interconnection request to remain a Completed TSWL \nInterconnection Application, the applicant requesting the TSWL Interconnection \nor the entity with whom the Participating TO will interconnect for the \nInterconnection shall execute the Interconnection Agreement and return it to the \nParticipating TO within thirty (30) Business Days of receipt. Alternatively, if an \napplicant requesting the TSWL Interconnection or the entity with whom the"},{"page":199,"startToken":74826,"endToken":75297,"text":"31 \nLS Power GridLSPGC TO Tariff \n \n \nParticipating TO will interconnect for the Interconnection requests the \nParticipating TO to file an unexecuted Interconnection Agreement and commits to \nabide by the terms, conditions, and cost assignments determined to be just and \nreasonable under the CAISO ADR Procedures, including any determination by \nFERC or on appeal of a FERC determination in accordance with that process, the \nParticipating TO shall promptly file an unexecuted Interconnection Agreement. \nProvided, however, that if the CAISO ADR Procedures concerns whether the \nrequesting entity is eligible for a TSWL Interconnection, the Participating TO \nshall not be obligated to file an unexecuted Interconnection Agreement or \ncommence construction of any facilities or incur other costs under the \nInterconnection Agreement until a final order determining the just and reasonable \nrates, terms, and conditions for such Interconnection Agreement has been issued \nby the applicable court or regulatory authority. If the applicant or the entity with \nwhom the Participating TO will interconnect for the Interconnection elects not to \nexecute the Interconnection Agreement and does not request the Participating TO \nto file an unexecuted Interconnection Agreement, its Completed TSWL \nInterconnection Application shall be deemed withdrawn, and the applicant shall \nreimburse to the Participating TO all costs reasonably incurred in processing the \napplication not covered by any System Impact Study Agreement or Facilities \nStudy Agreement. \n \nWhere a TSWL Interconnection will serve one or more Large Loads, as a \ncondition to the Participating TO’s design, procurement, construction, or \noperation of any Large Load-Driven Upgrades (as defined in the pro forma Large \nLoad Cost Recovery Agreement set forth in Appendix V) associated with the \nTSWL Interconnection, the applicant or Eligible Customer shall also, within the \nsame period and subject to the same consequences as the Interconnection \nAgreement, execute and maintain a Cost Recovery Agreement substantially in the \nform set forth in Appendix V to this TO Tariff, or, if the applicant or Eligible \nCustomer requests that the Cost Recovery Agreement be filed unexecuted with \nFERC, comply with that agreement as made effective by FERC, in each case as \napplicable to the requested TSWL Interconnection. Disputes arising under a Cost \nRecovery Agreement shall be resolved under the dispute resolution provisions of \nthat agreement. \n \n10.10 Partial Interim Service. If the Participating TO determines that there will not be \nadequate transmission capability to satisfy the full amount requested in a \nCompleted TSWL Interconnection Application, the Participating TO nonetheless \nshall be obligated to offer and provide the portion of the requested TSWL \nInterconnection that can be accommodated without any additional Direct \nAssignment Facilities or Reliability Upgrades. However, the Participating TO \nshall not be obligated to provide the incremental amount of requested TSWL \nInterconnection that requires such additional facilities or upgrades until such \nfacilities or upgrades have been placed in service. \n \n10.11 Expedited Interconnection Procedures. In lieu of the procedures set forth"},{"page":200,"startToken":75297,"endToken":75735,"text":"32 \nLS Power GridLSPGC TO Tariff \n \n \nabove, the applicant shall have the option to expedite the processing of its \nCompleted TSWL Interconnection Application. In order to exercise this option, \nthe applicant shall submit in writing a Request for Expedited Interconnection \nProcedures to the Participating TO within ten (10) Business Days after receiving a \ncopy of the System Impact Study for the proposed TSWL Interconnection. Within \nten (10) Business Days after receiving a Request for Expedited Interconnection \nProcedures, the Participating TO shall tender an Expedited Interconnection \nAgreement that requires the applicant to compensate the Participating TO for all \ncosts reasonably incurred pursuant to the terms of this TO Tariff for processing \nthe Completed TSWL Interconnection Application and providing the requested \nTSWL Interconnection. While the Participating TO agrees to provide the \napplicant with its best estimate of the costs of any needed Direct Assignment \nFacilities and, if applicable, Reliability Upgrades, and such other charges that may \nbe incurred, unless otherwise agreed by the parties, such estimate shall not be \nbinding and the applicant must agree in writing to compensate the Participating \nTO for all actual TSWL Interconnection costs reasonably incurred pursuant to the \nprovisions of this TO Tariff. The applicant shall execute and return such \nExpedited Interconnection Agreement within ten (10) Business Days of its receipt \nor the applicant’s request for TSWL Interconnection will cease to be a Completed \nTSWL Interconnection Application and will be deemed terminated and \nwithdrawn. In that event, the applicant shall reimburse the Participating TO for all \ncosts reasonably incurred in processing the application not covered by the terms \nof the System Impact Study Agreement. \n \n10A. Interconnection Process for ECLL Interconnections. All requests for ECLL \nInterconnection shall be directed to the Participating TO. \n \n10A.1 Applicability. An ECLL Interconnection must be requested in order to connect \nthe facilities of the Participating TO to the facilities of an ECLL that has received \na request to connect and provide retail transmission service to a Large Load \nCustomer. \n \n10A.2 ECLL Application and Application Fee \n \n10A.2.1 \nApplication Contents. An ECLL requesting an ECLL \nInterconnection shall submit an ECLL Interconnection Application in the \nform of Attachment 1 to Appendix VI, which provides the following \nrequired information, and shall send a copy of the application to the \nCAISO. The ECLL Interconnection Application and all supporting \ndocumentation shall be submitted electronically to the Participating TO in \nthe manner posted on the Participating TO’s public website. \n \n(a) \nthe identity, address, telephone number, and email of the ECLL; \n(b) \nthe Point of Withdrawal; \n(c) \na proposed Large Load Customer load ramp schedule identifying \nanticipated load additions over time and the Large Load"},{"page":201,"startToken":75735,"endToken":76115,"text":"33 \nLS Power GridLSPGC TO Tariff \n \n \nCustomer’s maximum load; \n(d) \na site plan; \n(e) \ndocumentation demonstrating that the Large Load Customer has \nSite Control; \n(f) \ndocumentation demonstrating that the Large Load Customer has \nlocal permits and regulatory approvals for development of its Large \nLoad; \n(g) \na single-line electrical diagram; \n(h) \nthe electrical location of the source of the power (if known) to be \ntransmitted pursuant to the ECLL’s request for ECLL \nInterconnection. If the source of the power is not known, a system \npurchase will be assumed; \n(i) \ndisclosure of ECLL interconnection requests in the ECLL’s \nfootprint that are for the same Large Load Customer or any of its \naffiliate(s); \n(j) \na completed technical data form in the form of Appendix A to \nAttachment 1 to Appendix VI; \n(k) \nif the Large Load Customer will be a Co-Located Large Load, \ninformation concerning the relevant Generating Facility must be \nprovided by the ECLL. Such information may be either: (1) if the \nGenerating Facility has not signed a generator interconnection \nagreement, the identifying queue number of the Generating \nFacility; or (2) if the Generating Facility has signed a generator \ninterconnection agreement, information that will allow the \nParticipating TO to identify such agreement; and \n(l) \nthe proposed date for energizing the ECLL Interconnection and the \nproposed term of the ECLL Interconnection service. \n \n10A.2.2 \nParticipating TO Review of ECLL Interconnection \nApplication. Within ten (10) Business Days after receipt of an ECLL \nInterconnection Application, the Participating TO shall determine whether \nthe application is complete (“Completed ECLL Interconnection \nApplication”). Wherever possible, the Participating TO will attempt to \nremedy deficiencies in the ECLL Interconnection Application through \ninformal communications with the ECLL. If such efforts are unsuccessful, \nthe Participating TO shall return the ECLL Interconnection Application to \nthe ECLL. \n \nThe Participating TO will treat the information provided in the ECLL \nInterconnection Application, including the ECLL’s and Large Load \nCustomer’s identity, as confidential at the request of the ECLL except to \nthe extent that disclosure of this information is required by this TO Tariff \nor the CAISO Tariff, by regulatory or judicial order, for reliability \npurposes pursuant to Good Utility Practice, or pursuant to RTG or CAISO \ntransmission information sharing agreements. The Participating TO shall \ntreat this information consistent with the standards of conduct contained in"},{"page":202,"startToken":76115,"endToken":76528,"text":"34 \nLS Power GridLSPGC TO Tariff \n \n \nPart 37 of FERC’s regulations. \n \n10A.3 Study Process and ECLL Interconnection Agreement. ECLL Interconnection \nApplications shall be processed, and ECLL Interconnection Agreements shall be \ntendered, executed, and filed, in accordance with the Large Load Interconnection \nProcedures set forth in Appendix VI. Disputes arising under a Cost Recovery \nAgreement shall be resolved under the dispute resolution provisions of that \nagreement. \n \n10A.4 Interim Service \n \n10A.4.1 \nInterim Firm Interconnection Service and Flexible Interim \nLoad Interconnection (FILI) Service. If the ECLL has requested Interim \nFirm Interconnection Service and/or FILI Service, the Participating TO \nshall perform an analysis and report the extent to which the requested \ninterim services can be provided, prior to such time that all ECLL \nInterconnection Facilities are in service and the Large Load Customer is \nauthorized to withdraw Energy. However, the Participating TO shall not \nbe obligated to provide any amount of Firm Interconnection Service \nrequested until necessary facilities have been placed in service. FILI \nService will be available for all remaining Load that cannot receive \nInterim Firm Interconnection Service, if the Large Load Customer has the \nability to reduce the load at a specified point of interconnection according \nto the timelines and protocols set forth in an executed and effective FILI \nService Agreement, until the ECLL Interconnection Facilities are in \nservice. As ECLL Interconnection Facilities are placed into service and \ntransmission interconnection capability is increased, available quantities of \nFirm Interconnection Service and FILI Service will be updated and \nreflected in the applicable FILI Service Agreement. \n \nIf the Large Load Customer seeks FILI Service, the ECLL will ensure that \nthe Large Load Customer signs a FILI Service Agreement developed by \nthe Participating TO, or asks for the agreement to be filed unexecuted. \n \n10A.4.2 \nStudy Process for Interim Service and Determination of \nAvailability of Interim Firm Interconnection Service and FILI \nService. The Participating TO shall perform a FILI Study in accordance \nwith Section 4.6.2 of Appendix VI to determine the maximum amount of \nany Interim Firm Interconnection Service, if any, and FILI Service, if any, \nthat may be provided based on the anticipated availability of transmission \ncapacity once the Large Load Customer is permitted to withdraw energy \nby the ECLL. The Participating TO shall update this analysis under the \nterms of the FILI Service Agreement, at least annually. \n \nThe actual amount of any FILI Service to be provided during any \noperating period shall be determined by the Participating TO through"},{"page":203,"startToken":76528,"endToken":76925,"text":"35 \nLS Power GridLSPGC TO Tariff \n \n \noperational assessments and analysis conducted closer to real-time \noperating conditions. Accordingly, the maximum FILI Service established \nin the annual analysis does not guarantee the availability of such service \nunder actual system conditions. \n \n10A.4.3 \nConditions Related to FILI Service \n \n10A.4.3.1 \nFILI Service Reliability Requirements. The FILI Service \nAgreement will identify what ECLL Interconnection Facilities \nmust be installed, the necessary protection and control systems and \nany other equipment necessary to be installed, and operating \nlimitations to allow the Large Load Customer to withdraw energy \n(“FILI Service Reliability Requirements”). FILI Service shall not \ncommence until the Participating TO and ECLL have completed \ninstallation and commissioning of all equipment specified under \nthe FILI Service Agreement. \n \n10A.4.3.2 \nCurtailment of FILI Service. FILI Service is subject to \ncurtailment at all times, unless the Participating TO’s right to \ncurtail is expressly conditioned or otherwise limited in an executed \nand effective FILI Service Agreement. A Large Load Customer \nreceiving FILI Service shall be subject to curtailment prior to any \ncurtailment of customers receiving Firm Interconnection Service. \nThe Participating TO and CAISO may curtail FILI Service as \nnecessary to maintain the reliable operation of the CAISO \nControlled Grid, including during normal operating conditions. \n \n10A.4.3.3 \nExceedance of Authorized FILI Service. An ECLL shall \nensure that the operating instructions issued by the Participating \nTO pursuant to a FILI Service Agreement are not exceeded at the \nrelevant Point of Withdrawal. The Participating TO shall have the \nright to disconnect service to the Large Load Customer in the event \nthat energy withdrawals violate the terms of the FILI Service \nAgreement. The Participating TO shall follow Good Utility \nPractice in carrying out any such disconnection and subsequent \nreconnection when the conditions for such reconnection set forth in \nthe FILI Service Agreement have been met. Nothing in this TO \nTariff prevents the CAISO from applying any financial penalties \napplicable to Large Load Customers. \n \n10A.5 Co-Located Large Load. The interconnection processes applicable to a Co-\nLocated Large Load shall be determined based on whether the Generating Facility \nis a (1) non-exporting Generating Facility interconnected in accordance with the \ngenerator interconnection rules of the applicable ECLL, as approved by its Local \nRegulatory Authority (including, for a UDC subject to the jurisdiction of the \nCPUC, CPUC Electric Rule 21); or (2) an exporting Generating Facility subject to"},{"page":204,"startToken":76925,"endToken":77413,"text":"36 \nLS Power GridLSPGC TO Tariff \n \n \nthe applicable CAISO generator interconnection procedures and requirements. \nThe ECLL for a Co-Located Large Load connecting to facilities of an exporting \nGenerating Facility will be subject to this Section 10A. \n \nFor a Co-Located Large Load interconnected to the facilities of an exporting \nGenerating Facility, the CAISO will be a party to a pro forma agreement that \nbridges the pro forma Large Generator Interconnection Agreement (LGIA) with \nthe ECLL Interconnection Agreement, or will negotiate a non-conforming LGIA \nto account for certain details of the Co-Located Large Load interconnection on an \nindividual basis. The Generating Facility developer will also execute a CAISO pro \nforma Participating Generator Agreement for the Generating Facility, but not a \nParticipating Load Agreement for the Co-Located Large Load. \n \n10A.6 Large Load Cost Recovery Agreement. As a condition to the Transmission \nOwner’s design, procurement, construction, or operation of a Large Load-Driven \nUpgrade, the Eligible Customer shall execute and maintain a Large Load Cost \nRecovery Agreement substantially in the form set forth in Appendix V to this TO \nTariff, as applicable to the requested service and associated Large Load Facility. \n \n11. \nUncontrollable Forces and Indemnification \n \n11.1 \nProcedures to Follow If Uncontrollable Force Occurs. In the event of the \noccurrence of an Uncontrollable Force which prevents the Participating TO or a \nMarket Participant from performing any of its obligations under this TO Tariff, \nthe affected entity shall (i) if it is the Participating TO, immediately give notice to \nthe Market Participants in writing of the occurrence of such Uncontrollable Force \nand, if it is a Market Participant, immediately give notice to the Participating TO \nof the occurrence of such  uncontrollable  Uncontrollable Force; (ii) not be \nentitled to suspend performance in any greater or longer duration than is required \nby the Uncontrollable Force, (iii) use its best efforts to mitigate the effects of such \nUncontrollable Force, remedy its inability to perform, and resume full \nperformance hereunder, (iv) in the case of the Participating TO, keep the Market \nParticipants apprised of such efforts and, in the case of the Market Participants, \nkeep the Participating TO apprised of mitigation efforts, in each case on a \ncontinual basis; and (v) provide written notice of the resumption of performance \nhereunder. Notwithstanding any of the foregoing, the settlement of any strike, \nlockout, or labor dispute constituting an Uncontrollable Force shall be within the \nsole discretion of the entity affected thereby, and the requirement that a \nParticipating TO or Market Participant must use its best efforts to remedy the \ncause of the Uncontrollable Force and mitigate its effects and resume full \nperformance hereunder shall not apply to strikes, lockouts, or labor disputes.  No \nMarket Participant or Participating TO will be considered in default as to any \nobligation under this TO Tariff if prevented from fulfilling the obligation due to \nthe occurrence of an Uncontrollable Force. \n \n11.2 \nIndemnification.  A Market Participant shall at all times indemnify, defend, and"},{"page":205,"startToken":77413,"endToken":77908,"text":"37 \nLS Power GridLSPGC TO Tariff \n \n \nsave the Participating TO harmless from any and all damages, losses, claims, \n(including claims and actions relating to injury or to death of any person or \ndamage to property), demands, suits, recoveries, costs and expenses, court costs, \nattorney fees, and all other obligations by or to third parties, arising out of or \nresulting from the Participating TO’s performance of its obligations under this TO \nTariff on behalf of a Market Participant, except in cases of negligence or \nintentional wrongdoing by the Participating TO. \n \n12. \nRegulatory Filings. Nothing contained herein shall be construed as affecting, in any \nway, the right of any electric utility (as defined by the Federal Power Act) Participating \nTO furnishing services in accordance with this TO Tariff, CAISO Tariff or any tariff and \nrate schedule which results from or incorporates this TO Tariff, unilaterally to make \napplication to FERC as it deems necessary and appropriate to recover its Transmission \nRevenue Requirements, or for a change in its rates, including changes in rate \nmethodology, or for a change in designation of transmission facilities to be placed under \nthe CAISO’s control, in each case under Section 205 of the FPA and pursuant to the \nFERC’s Rules and Regulations promulgated thereunder. Nothing contained herein shall \nbe construed as affecting in any way the ability of any Eligible Customer receiving \nservices in accordance with this TO Tariff to exercise its rights under the Federal Power \nAct and pursuant to the FERC’s rules and regulations promulgated thereunder. \n \n12.1 \nOpen Access. For purposes of the Stranded Cost Recovery available under \nOrder Nos. 888 and 888-A, this Tariff, combined with the CAISO Tariff and \nwholesale distribution access tariff, if any, shall be considered an open access \ntariff under FERC Order Nos. 888 and 888-A. \n13. \nCreditworthiness \n13.1 \nUDCs, MSSs, and Scheduling Coordinators Using the Participating TO’s \nLow Voltage Transmission Facilities. For the purpose of determining the ability \nof a UDC, MSS, and Scheduling Coordinator to meet its obligations related to \nusing the Participating TO’s Low Voltage Transmission Facilities hereunder, \nwhere the Participating TO is collecting the Low Voltage Access Charge directly \nfrom each UDC, MSS and Scheduling Coordinator, the Participating TO may \nrequire reasonable credit review procedures for the UDC, MSS, or Scheduling \nCoordinator. This review shall be made in accordance with standard commercial \npractices. In addition, the Participating TO may require the UDC, MSS, or \nScheduling Coordinator to provide and maintain in effect during the term of the \nservice, an unconditional and irrevocable letter of credit as security to meet its \nresponsibilities and obligations under this TO Tariff, or an alternative form of \nsecurity proposed by the UDC, MSS, or Scheduling Coordinator and acceptable \nto the Participating TO, and consistent with commercial practices established by \nthe Uniform Commercial Code, that protect the Participating TO against the risk \nof non-payment. \n13.2 \nEnd-Users. Creditworthiness and security rules applicable to End-Users \nshall be pursuant to the then-current rules of the applicable Local"},{"page":206,"startToken":77908,"endToken":78384,"text":"38 \nLS Power GridLSPGC TO Tariff \n \n \nRegulatory Authority and any agreement under this TO Tariff to which \nthe End-User is a party. \n \n1314.    \nDisputes.  Except as limited below , as provided in Sections 10.9 and 10A.3, or \nas otherwise limited by law, the CAISO ADR proceduresProcedures shall apply to all \ndisputes between parties which arise under this TO Tariff or under or in respect of the \nproposed terms and conditions of a Facilities Study Agreement, System Impact Study \nAgreement or Expedited ServiceInterconnection Agreement. The CAISO ADR \nProcedures set forth in Section 13 of the CAISO Tariff shall not apply to disputes as to \nwhether rates and charges set forth in this TO Tariff (other than charges for studies) are \njust and reasonable under the FPA. \n \n1415. Miscellaneous. \n \n14.115.1 \nNotices. Any notice, demand, or request in accordance with this \nTO Tariff, unless otherwise provided in this TO Tariff, shall be in writing and \nshall be deemed properly served, given, or made: (i) upon delivery if delivered \nin person or electronically via email, (ii) five days after deposit in the mail if \nsent by first class United States mail, postage prepaid, (iii) upon receipt of \nconfirmation by return electronic facsimile if sent by facsimile, or (iv) upon \nParty at the address set forth in Appendix II.  Any Party may at any time, by \nnotice to the other Parties, change the designation or address of the person \nspecified in Appendix II to receive notice on its behalf.  Any notice of a routine \ncharacter in connection with service under this TO Tariff or in connection with \noperation of facilities shall be given in such a manner as the Parties may \ndetermine from time to time, unless otherwise provided in this TO Tariff. \n \n14.215.2 \nWaiver. Any waiver at any time by any Party of its rights with \nrespect to any default under this TO Tariff, or with respect to any other matter \narising in connection with this TO Tariff, shall not constitute or be deemed a \nwaiver with respect to any subsequent default or other matter arising in \nconnection with this TO Tariff. Any delay short of the statutory period of \nlimitations in asserting or enforcing any right shall not constitute or be deemed a \nwaiver. \n \n14.315.3 \nConfidentiality. \n \n14.3.115.3.1  Maintaining Confidentiality If Not for Public Disclosure. The \nParticipating TO shall maintain the confidentiality of all of the \ndocuments, data, and information provided to it by any other Market \nParticipant that such Market Participant may designate as confidential, \nprovided, however, that the information will not be held confidential by \nthe Participating TO if (1) the Participating TO or Market Participant is \nrequired to provide such information for public disclosure pursuant to \nthis TO Tariff or applicable regulatory requirements, or (2) the \ninformation becomes available to the public on a non-confidential basis"},{"page":207,"startToken":78384,"endToken":78840,"text":"39 \nLS Power GridLSPGC TO Tariff \n \n \n(other than from the Participating TO). \n \n14.3.215.3.2  Disclosure of Confidential Information. Notwithstanding \nanything in this Section 16.315.3 to the contrary, if the Participating TO \nor any Market Participant is required by applicable laws or regulations, or \nin the course of administrative or judicial proceedings, to disclose \ninformation that is otherwise required to be maintained in confidence \npursuant to this Section 16.315.3, the Participating TO or Market \nParticipant may disclose such information; provided, however, that as \nsoon as such Participating TO or Market Participant learns of the \ndisclosure requirement and prior to making such disclosure, such \nParticipating TO or Market Participant shall notify the affected \nParticipating TO or Market Participants of the requirement and the terms \nthereof. The affected Participating TO or Market Participants may, at \ntheir sole discretion and own costs, direct any challenge to or defense \nagainst the disclosure requirement and the disclosing Participating TO or \nMarket Participant shall cooperate with such affected Participating TO or \nMarket Participants to the maximum extent practicable to minimize the \ndisclosure of the information consistent with applicable law. The \ndisclosing Participating TO or Market Participant shall cooperate with the \naffected Participating TO or Market Participants to obtain proprietary or \nconfidential treatment of confidential information by the person to whom \nsuch information is disclosed prior to any such disclosure. \n \n14.415.4 \nTO Tariff Supersedes Existing Tariffs. This TO Tariff, together \nwith the CAISO Tariff and wholesale distribution access tariff if any, supersedes \nany pre- existing open access transmission tariff of the Participating TO. \n \n14.515.5 \nTitles. The captions and headings in this TO Tariff are inserted \nsolely to facilitate reference and shall have no bearing upon the interpretation \nof any of the rates, terms, and conditions of this TO Tariff. \n \n14.615.6 \nSeverability. If any term, covenant, or condition of this TO \nTariff or the application or effect of any such term, covenant, or condition is \nheld invalid as to any person, entity, or circumstance, or is determined to be \nunjust, unreasonable, unlawful, imprudent, or otherwise not in the public \ninterest, by any court or government agency of competent jurisdiction, then \nsuch term, covenant, or condition shall remain in force and effect to the \nmaximum extent permitted by law, and all other terms, covenants, and \nconditions of this TO Tariff and their application shall not be affected thereby \nbut shall remain in force and effect. The Participating TO and Market \nParticipants shall be relieved of their obligations only to the extent necessary to \neliminate such regulatory or other determination, unless a court or \ngovernmental agency of competent jurisdiction holds that such provisions are \nnot severable from all other provisions of this TO Tariff."},{"page":208,"startToken":78840,"endToken":79145,"text":"40 \nLS Power GridLSPGC TO Tariff \n \n \n14.715.7 \nPreservation of Obligations. Upon termination of this TO Tariff, \nall unsatisfied obligations of any entity shall be preserved until satisfied. \n \n14.815.8 \nGoverning Law. This TO Tariff shall be interpreted, governed by, \nand construed under the laws of the State of California, without regard to the \nprinciples of conflict of laws thereof, or the laws of the United States, as \napplicable, as if executed and to be performed wholly within the State of \nCalifornia. \n \n14.915.9 \nAppendices Incorporated. The several appendices to this TO Tariff, \nas may be revised from time to time, are attached to this TO Tariff and are \nincorporated by reference as if fully set forth herein. \n \n14.1015.10 \nConflict With CAISO Tariff.  If a Market Participant identifies a \nconflict between the TO Tariff and the CAISO Tariff, the Participating TO and \nthe Market Participant shall make good-faith efforts to resolve the conflict.  If the \nParticipating TO and Market Participant are unable to informally resolve that \nconflict, the Participating TO and Market Participant may use the CAISO ADR \nProcedures to resolve it as set forth in Section 14 of this Tariff. \n \n14.1115.11 \nConflicting Operating Instructions. In the event a Market \nParticipant receives conflicting operating instructions from the CAISO and one or \nmore Participating TO(s), if human safety would not knowingly be neither \njeopardized nor electric facilities subject to damage while the Market Participant \nseeks to reconcile the conflict with the appropriate CAISO and Participating TO \nemployees before acting, the Market Participant should attempt a reconciliation. \nOtherwise, the Market Participant shall adhere to CAISO Tariff Section 4.2 and \nfollow the CAISO’s instructions. In no event shall a Market Participant be \nrequired to follow operating instructions from the CAISO if following those \ninstructions would knowingly jeopardize human safety."},{"page":209,"startToken":79145,"endToken":79515,"text":"1 \n \nLS POWER GRID CALIFORNIA, LLC \n[PRO FORMA] LARGE LOAD COST RECOVERY AGREEMENT  \n \nThis Large Load Cost Recovery Agreement (this “Agreement”) is entered into as of this __ day \nof _______ 20  , by and between [________], a [●] and an Eligible Customer under the CAISO \nTariff (“Eligible Customer”), and LS Power Grid California, LLC, a Delaware limited liability \ncompany (“LS Power Grid” or “Transmission Owner”). LS Power Grid and Eligible Customer \nare referred to collectively as the “Parties” and individually as a “Party.”  \n[_______], a [●] (“Large Load Customer”), executes the Limited Acknowledgment set forth \nbelow solely for the purposes stated therein and is not a Party to the wholesale payment \nobligations established by this Agreement.  \n \nRECITALS \n \nWHEREAS, LS Power Grid is a transmission-only company established to develop, \nown, and operate transmission facilities (“Transmission Facilities”) pursuant to the provisions of \nits Transmission Owner Tariff (“TO Tariff”) and the California Independent System Operator \nCorporation (“CAISO”) Open Access Transmission Tariff (“CAISO Tariff”); \nWHEREAS, Eligible Customer is eligible to take transmission service under the CAISO \nTariff and does or will take such service on behalf of the Large Load Customer, whether or not \nEligible Customer owns or operates an electric distribution system; \nWHEREAS, Eligible Customer and Transmission Owner are parties to, or are entering \ninto, an Eligible Customer for Large Load (“ECLL”) Interconnection Agreement or \nTransmission System Wholesale Load (“TSWL”) Interconnection Agreement (each, an \n“Interconnection Agreement”) concerning the Large Load Facility; \nWHEREAS, Large Load Customer owns, operates, or proposes to develop the Large \nLoad Facility identified in Schedule 1; \nWHEREAS, the Eligible Customer has submitted an ECLL Interconnection Application \nor TSWL Interconnection Application for the interconnection of the Large Load Facility as a \nnew or incremental load; \nWHEREAS, Eligible Customer intends to procure transmission service pursuant to the \nCAISO Tariff and its associated schedules on behalf of Large Load Customer; \nWHEREAS, in connection with the Large Load Facility, Transmission Owner must \nmake additions and/or modifications to its transmission system, including the Large Load-Driven \nUpgrades identified in Schedule 1; \n \nWHEREAS, CAISO may, under the CAISO Tariff or a Commission-accepted \nmethodology, formally assign to the Large Load Facility a specific share of the costs or revenue \nrequirement of a regional transmission project, and the Parties intend this Agreement to address"},{"page":210,"startToken":79515,"endToken":79926,"text":"2 \n \nthat assigned share without changing any allocation otherwise established under the CAISO \nTariff; \nWHEREAS, the applicable studies may identify impacts on transmission systems other \nthan LS Power Grid’s transmission system and may identify Affected System Upgrades \nnecessary to accommodate or mitigate such impacts; \n \nWHEREAS, Eligible Customer is responsible for entering into and maintaining the \narrangements, payment obligations, and financial security or credit support required by each \napplicable Affected System Owner to ensure that costs and financial risks associated with \nAffected System Upgrades are not shifted to customers that did not cause those costs; \nWHEREAS, Transmission Owner, Eligible Customer, and Distribution Utility have \nexecuted or expect to execute an engineering and procurement agreement and/or an \nInterconnection Agreement governing the design, construction, and interconnection of the \nTransmission Owner’s facilities to the Distribution Utility’s facilities, including the Network \nUpgrades, required to support service of the Large Load Facility; \nWHEREAS, the Parties enter into this Agreement to establish the Eligible Customer’s \nwholesale revenue-support and security obligations associated with the Large Load Facility and \nthe Large Load-Driven Upgrades, without establishing or prescribing the retail rates, charges, or \nrecovery arrangements between Eligible Customer and Large Load Customer; \nWHEREAS, the Commission has recognized that the framework under which CAISO \nprovides transmission service is unique and that certain responsibilities fall to the Participating \nTransmission Owners, Cal. Indep. Sys. Operator Corp., 195 FERC ¶ 61,214, at P 37 (2026), and \nthis Agreement is the form of agreement established under Sections 10.9 and 10A.6 of the TO \nTariff to secure Eligible Customer’s minimum contribution toward Transmission Owner’s \ntransmission revenue requirement; \nWHEREAS, CAISO is not a party to this Agreement; this Agreement does not create \nany obligation of CAISO, including any obligation to provide settlement, metering, billing, \nresettlement, or allocation data, which arises, if at all, under the CAISO Requirements; and LS \nPower Grid shall recover the costs of the Covered Upgrades through its Formula Rate and shall \nflow TRBAA Credits, including any adjustment resulting from the resolution of a dispute under \nthis Agreement, through to transmission customers through its TRBAA; \nNOW, THEREFORE, in consideration of the mutual promises and covenants set forth \nherein, and for other good and valuable consideration, the receipt and sufficiency of which are \nhereby acknowledged, the Parties intending to be legally bound, agree as follows:  \n1. Recitals. The statements set forth in the recitals above are hereby incorporated herein into \nthe terms and conditions of this Agreement as if fully set forth herein."},{"page":211,"startToken":79926,"endToken":80332,"text":"3 \n \n2. Definitions \nCapitalized terms not defined herein have the meanings given in the CAISO Tariff, the LS \nPower Grid TO Tariff Formula Rate Implementation Protocols in Appendix IV of the TO \nTariff (“Protocols”), or the relevant Interconnection Agreement. \n2.1. \n“Affected System” means an electric transmission system, other than LS Power \nGrid’s transmission system, that an applicable study determines may be materially \naffected by the interconnection or service of the Large Load Facility, including the \ntransmission system of another Participating TO or a transmission system outside the \nCAISO Controlled Grid. \n2.2. \n“Affected System Arrangement” means an executed agreement or other binding \narrangement entered into by Eligible Customer with an Affected System Owner that \nestablishes the applicable study, engineering, design, procurement, construction, \nownership, cost responsibility, cancellation-cost, revenue-support, payment, financial \nsecurity or credit support, true-up, and other obligations associated with an Affected \nSystem Upgrade. \n2.3. \n“Affected System Owner” means the owner or operator responsible for an Affected \nSystem. \n2.4. \n“Affected System Upgrade” means an addition, modification, or upgrade to an \nAffected System that an applicable study determines is necessary to accommodate or \nmitigate an impact caused, in whole or in part, by the interconnection or service of the \nLarge Load Facility. \n2.5. \n“Annual MTRC” means the annual Minimum Transmission Revenue Contribution \nfor a Covered Upgrade, calculated solely under the MTRC Calculation Template in \nSchedule 5. Before the Final MTRC Determination Date for a Covered Upgrade, the \nAnnual MTRC is the Estimated Annual MTRC. On and after that date, it is the Final \nAnnual MTRC fixed under Section 6.3. Each Annual MTRC is levelized over a twenty \n(20)-year MTRC Term beginning on the applicable Upgrade In-Service Date or \nRegional Project In-Service Date, as applicable. The Annual MTRC is not an input to, \nor calculation made under, LS Power Grid’s annual Formula Rate update. \n2.6. \n“Annual Termination Fee Credit” means the annual amount of a Termination Fee \nBalance included in the TRBAA under Section 3.3.4. \n2.7. \n“Applicable Allocation Percentage” has the meaning set forth in Section 6.3.3. \n2.8. \n“Applicable Laws and Regulations” means all duly promulgated applicable federal, \nstate, and local laws, regulations, rules, ordinances, codes, decrees, judgments, \ndirectives, judicial or administrative orders, permits, and other duly authorized actions \nof any Governmental Authority. \n2.9. \n“Applied Security Proceeds” means proceeds of Operational Security that \nTransmission Owner has applied under Section 7.6 to an identified Supplemental"},{"page":212,"startToken":80332,"endToken":80760,"text":"4 \n \nMTRC, prior-period true-up adjustment, Termination Fee, or other payment obligation \narising under Article 6 or Section 3.3.4. Proceeds of Construction Security applied to \nPre-In-Service Termination Costs or other construction-related obligations are not \nApplied Security Proceeds and shall be treated as provided in Sections 3.3.2 and 3.3.3. \n2.10. “ARR” means annual revenue requirement. \n2.11. “Break-Even” has the meaning set forth in Section 6.7. \n2.12. “Business Day” means a Business Day as defined in Appendix A to the CAISO Tariff, \nas amended from time to time. \n2.13. “CAISO-Assigned Regional Project” means a regional transmission project \napproved or designated through a CAISO Tariff process for which CAISO, under the \nCAISO Tariff or a Commission-accepted methodology, formally assigns a specific \npercentage or amount of project costs or revenue requirement to the Large Load \nFacility. The project and assignment must be identified in Schedule 4. A project’s \nregional designation, general system benefit, or inclusion in a CAISO transmission \nplan, without a specific assignment to the Large Load Facility, does not by itself make \nthe project a CAISO-Assigned Regional Project. \n2.14. “CAISO Requirements” means the CAISO Tariff, the Transmission Control \nAgreement, any other agreement to which CAISO is a party that is on file with or \naccepted by the Commission, and any Commission order, regulation, or Commission-\naccepted methodology applicable to CAISO, each as amended from time to time, \ntogether with any CAISO business practice manual or procedure to the extent it \nimplements any of the foregoing. \n2.15. “Calendar Day” means every day, including Saturdays, Sundays, federal holidays, \nand other holidays. \n2.16. “Construction Security” has the meaning set forth in Section 7.1.  \n2.17. “Covered Upgrade” means each Large Load-Driven Upgrade and each LS Power \nGrid-owned CAISO-Assigned Regional Project share that is included in Schedule 1 or \nSchedule 4, as applicable, and for which an Annual MTRC is established under this \nAgreement. \n2.18. “Credit Review Event” means a payment default, credit rating downgrade of the \nEligible Customer or an issuing bank that has not yet triggered a Material Adverse \nCredit Event, a notice of nonrenewal of a Letter of Credit, or another event that, in LS \nPower Grid’s reasonable judgment, warrants updated credit information. A Credit \nReview Event does not, by itself, require delivery of additional Security absent a \nresulting shortfall. \n2.19. “Cumulative Revenue Ledger” means the customer-, Large Load Facility-, project-, \nand Covered Upgrade-specific record maintained by LS Power Grid under Section 6.7. \nThe Cumulative Revenue Ledger shall identify the applicable Total Required Revenue"},{"page":213,"startToken":80760,"endToken":81170,"text":"5 \n \nCommitment, Annual MTRC, Qualifying Transmission Revenues, Supplemental \nMTRC Receipts, Applied Security Proceeds, effective prospective reassignments, \nother permitted adjustments, and the resulting Remaining Cumulative Revenue \nResponsibility and Required Operational Security. \n2.20. “Cumulative Revenue Responsibility” or “Remaining Cumulative Revenue \nResponsibility” means the Total Required Revenue Commitment less amounts that \nhave satisfied that commitment under Section 6.7. \n2.21. “Dispute Determination” has the meaning set forth in Section 11.5. \n2.22. “Distribution Utility” means the public utility, municipal utility, cooperative, or other \nentity that owns, operates, or is responsible for the distribution facilities to which the \nLarge Load Facility is interconnected or proposed to be interconnected, including its \nsuccessors and permitted assigns. \n2.23. “Effective Date” has the meaning set forth in Section 3.1. \n2.24. “Estimated Annual MTRC” means the annual MTRC for a Covered Upgrade \ncalculated from the then-current estimated capital cost using the MTRC Calculation \nTemplate in Schedule 5. LS Power Grid may update the Estimated Annual MTRC as \ncosts change during construction, including when LS Power Grid requires additional \nConstruction Security. \n2.25. “Event of Default” has the meaning set forth in Section 7.11. \n2.26. “Final Annual MTRC” means the fixed Annual MTRC for a Covered Upgrade \nestablished on the Final MTRC Determination Date using final incurred capital cost \nand the Project-Specific Levelized Fixed Charge Rate calculated under the MTRC \nCalculation Template in Schedule 5, including the agreed five percent (5%) annual \nlevelized-depreciation schedule over the twenty (20)-year MTRC Term. The Final \nAnnual MTRC is not recalculated through LS Power Grid’s Formula Rate or Protocols \nand may be recalculated only as provided in Section 6.3.1. \n2.27. “Final MTRC Determination Date” means the date on which LS Power Grid \nestablishes the Final Annual MTRC for a Covered Upgrade, which shall occur within \none (1) year after the applicable Covered Upgrade enters service, when the actual \ncapital cost of that Covered Upgrade is known and all costs associated with its \nestimated capital cost have been accounted for. \n2.28. “Force Majeure” means any cause beyond the reasonable control of the Party \nclaiming, and without the fault or negligence of such Party, which materially prevents \nor impairs the performance of such Party’s obligations hereunder, including but not \nlimited to landslides, storms, ice storms, flood, drought, tornado, hurricane, lightning, \nearthquake, fire, explosion, failure or imminent threat of failure of facilities, supply \nchain issues, civil disturbance, strike, or other labor disturbance, sabotage, vandalism,"},{"page":214,"startToken":81170,"endToken":81623,"text":"6 \n \nriot, terrorism, blockade, insurrection, war, national emergency, or restraint by any \nGovernmental Authority. \n2.29. “Forecast TRBAA Credit” has the meaning set forth in Section 6.8. \n2.30. “Formula Rate” means LS Power Grid’s transmission formula rate template and \nassociated provisions in the TO Tariff, as accepted by the Commission and amended \nfrom time to time. \n2.31. “Governmental Authority” means any federal, state, local, or other governmental, \nregulatory, or administrative agency, court, commission, department, board, \nlegislature, rulemaking body, tribunal, or other governmental authority having \njurisdiction over a Party, the Large Load Facility, any Large Load-Driven Upgrade, or \nthe services or obligations addressed by this Agreement. \n2.32. “Initial Allocation Percentage” has the meaning set forth in Section 6.3.2. \n2.33. “Large Load-Driven Upgrades” means the transmission facilities owned or to be \nconstructed by LS Power Grid and identified in Schedule 1 that the applicable study \ndetermines are driven in whole or in part by the Large Load Facility, alone or together \nwith one or more other large loads. Large Load-Driven Upgrades do not include \nAffected System Upgrades or any facilities whose costs are directly assigned to and \npaid by Eligible Customer under an Interconnection Agreement and are not included \nin LS Power Grid’s rate base. Where a Large Load-Driven Upgrade is an addition to \nor modification of a facility jointly owned by LS Power Grid and another entity, the \nLarge Load-Driven Upgrade includes only LS Power Grid’s ownership share \nidentified in Schedule 1. \n2.34. “Large Load Facility” means the new or incremental load facility owned, operated, \nor proposed to be developed by Large Load Customer and identified in Schedule 1. \n2.35. “Large Load Service Commencement Date” means the date on which the Large \nLoad Facility first takes electric service through the CAISO Controlled Grid or \notherwise begins receiving service under the applicable CAISO Tariff arrangement, as \nspecified in Schedule 1. If the Large Load Facility is not reflected in a CAISO billing \ndeterminant used to assess TAC, Schedule 2 shall identify the applicable wholesale \ntransmission-access, wheeling, or other CAISO Tariff billing arrangement. \n2.36. “Letter of Credit” means an irrevocable, transferable standby letter of credit issued \nfor the benefit of LS Power Grid, meeting the requirements of Schedule 3. \n2.37. “Material Adverse Credit Event” means any of the following: (a) a bankruptcy, \ninsolvency, receivership, or similar event described in Section 7.6(e); (b) a reduction \nin the long-term senior unsecured debt rating of the Eligible Customer or an issuing \nbank below the standards set out in Section 4 of Schedule 3; (c) loss, cancellation, \nmaterial impairment, or expiration of Qualifying Retail Security Support without \ntimely replacement; (d) an incorrect, expired, withdrawn, unavailable, or materially"},{"page":215,"startToken":81623,"endToken":82060,"text":"7 \n \nmisleading Retail Security Certification, as described in Section 7.7 of this Agreement; \nor (e) another event that, in LS Power Grid’s reasonable judgment, materially impairs \nEligible Customer's ability to perform its payment or Security obligations under this \nAgreement. \n2.38. “MTRC Term” means, with respect to each Covered Upgrade, the period beginning \non and including the applicable Upgrade In-Service Date or Regional Project In-\nService Date, as applicable, and ending on the day immediately preceding the \ntwentieth (20th) anniversary of that in-service date (the “MTRC Term End Date”). The \nfirst and final Rate Years of the MTRC Term shall be prorated for partial-year service. \n2.39. “MTRC Term End Date” has the meaning set forth in the definition of “MTRC \nTerm.” \n2.40. “Net Revenue Requirement” means LS Power Grid’s Net Annual Transmission \nRevenue Requirement calculated under its Formula Rate for the applicable Rate Year. \n2.41. “Notice of Dispute” has the meaning set forth in Section 11.1. \n2.42. “Operational Security” has the meaning set forth in Sections 7.2 and 7.5. \n2.43. “Outside Date” means the date identified as the Outside Date in Schedule 1, as such \ndate may be extended by written agreement of the Parties. \n2.44. “Pre-In-Service Termination Costs” has the meaning set forth in Section 3.3.2. \n2.45. “Qualifying Retail Security Support” means retail-customer security for which \nEligible Customer has delivered a currently effective Retail Security Certification \nunder Schedule 3. \n2.46. “Qualifying Transmission Revenues” or “QTR” has the meaning set forth in Section \n6.2.  \n2.47. “Reconciliation Statement” has the meaning set forth in Section 6.6. \n2.48. “Regional Project Allocated ARR” means, for the share of a CAISO-Assigned \nRegional Project that is owned by LS Power Grid, included in LS Power Grid’s \nFormula Rate, and formally allocated to the Large Load Facility under the applicable \nCAISO Tariff provision or Commission-accepted methodology, the Annual MTRC for \nthat project share calculated under Section 6.3.5 and the MTRC Calculation Template \nin Schedule 5, which shall be the Estimated Annual MTRC before the Final MTRC \nDetermination Date and the Final Annual MTRC on and after that date. The Regional \nProject Allocated ARR is calculated using LS Power Grid’s allocated share of the \nproject’s estimated or final capital cost, as applicable, by applying the Project-Specific \nLevelized Fixed Charge Rate calculated under Schedule 5. For purposes of calculating \npresent-worth federal and state income-tax depreciation benefits, Schedule 5 applies a \nlevelized-depreciation rate of five percent (5%) of that allocated capital-cost share in \neach year of the applicable twenty (20)-year MTRC Term. The resulting Regional"},{"page":216,"startToken":82060,"endToken":82428,"text":"8 \n \nProject Allocated ARR shall be recorded in Schedule 4. If CAISO states the \nassignment as an annual revenue-requirement share rather than a capital-cost amount, \nthe equivalent capital-cost input shall be determined only under the allocation method \nestablished by the CAISO Tariff or a Commission-accepted methodology. \n2.49. “Regional Project In-Service Date” means, for a CAISO-Assigned Regional Project \nowned by LS Power Grid, the date the project, or a separately identifiable and \nseparately allocated portion of it, is energized, placed in service, and recorded as \nelectric plant in service on LS Power Grid’s books. Schedule 4 shall identify the \nexpected Regional Project In-Service Date for each project or separately identifiable \nportion. Inclusion of Construction Work in Progress in rate base before that date does \nnot constitute a Regional Project In-Service Date. \n2.50. “Required Operational Security” means the amount of Operational Security required \nunder Section 7.3 and Schedule 3, equal to the nominal Remaining Cumulative \nRevenue Responsibility except to the extent satisfied by Qualifying Retail Security \nSupport. \n2.51. “Required Security Amount” means the aggregate Security then required under this \nAgreement. \n2.52. “Retail Security Certification” means a certification substantially in the form of \nExhibit A contained in Schedule 3 of this Agreement, signed by an authorized officer \nof Eligible Customer, confirming that the Large Load Customer has posted retail \nsecurity with Eligible Customer that is available, through enforceable draw or \napplication rights or a binding undertaking, to satisfy the corresponding wholesale \nobligations under this Agreement. \n2.53. “Security” means Construction Security or Operational Security, as the context \nrequires.  \n2.54. “Security Notice” means LS Power Grid’s written notice of a required increase, \nrestoration, replacement, or other adjustment to Security, including reasonable \nsupporting detail then available. \n2.55. “Successor Eligible Customer” means an Eligible Customer that assumes \nresponsibility under Section 6.10. \n2.56. “Supplemental MTRC” has the meaning set forth in Section 6.4. \n2.57. “Supplemental MTRC Receipts” means payments of Supplemental MTRC received \nby Transmission Owner from or on behalf of Eligible Customer, excluding Applied \nSecurity Proceeds. \n2.58. “TAC” means the Transmission Access Charge, as defined in Appendix A to the \nCAISO Tariff, including the applicable Access Charge components identified in \nSchedule 2."},{"page":217,"startToken":82428,"endToken":82884,"text":"9 \n \n2.59. “Termination Cost Reconciliation” has the meaning set forth in Section 3.3.2. \n2.60. “Termination Fee” has the meaning set forth in Section 3.3.4. \n2.61. “Termination Fee Account” has the meaning set forth in Section 3.3.4.  \n2.62. “Termination Fee Balance” has the meaning set forth in Section 3.3.4. \n2.63. “Total Required Revenue Commitment” has the meaning set forth in Section 6.7. \n2.64. “Transmission Revenue Balancing Account Adjustment” or “TRBAA” means the \nTransmission Revenue Balancing Account Adjustment maintained by LS Power Grid \nunder Section 5.3 of the TO Tariff, as amended from time to time, and “Transmission \nRevenue Balancing Account” or “TRBA” means the associated balancing account \nmaintained under that Section. \n2.65. “TRBAA Credit” means a Forecast TRBAA Credit or an amount recorded in the \nTRBA under Section 6.8 for Supplemental MTRC Receipts, Applied Security \nProceeds other than Applied Security Proceeds applied to a Termination Fee, Annual \nTermination Fee Credits, or a duplicate-recovery credit under Section 3.3.3(d) or \nSection 6.3.5, in each case as flowed through to transmission customers through the \nTRBAA. A TRBAA Credit is not an input to the MTRC Calculation Template or the \nFormula Rate. \n2.66. “Upgrade In-Service Date” means, with respect to each Large Load-Driven Upgrade, \nthe date on which that Large Load-Driven Upgrade is energized, placed in service, and \nincluded as Electric Plant in Service in LS Power Grid’s rate base. Schedule 1 shall \nidentify the expected Upgrade In-Service Date for each Large Load-Driven Upgrade. \nInclusion of Construction Work in Progress in rate base before an upgrade is placed in \nservice does not constitute its Upgrade In-Service Date. \n3. Effective Date, Term and Termination \n3.1. \nEffective Date. This Agreement shall become effective upon execution by the Parties, \nsubject to acceptance by the Federal Energy Regulatory Commission (“FERC” or \n“Commission”) (if applicable), or, if filed unexecuted, upon the date specified by \nFERC (the “Effective Date”). \n3.2. \nTerm. This Agreement shall remain in effect from the Effective Date until LS Power \nGrid issues a final Reconciliation Statement determining that the Total Required \nRevenue Commitment for every Covered Upgrade has been satisfied, transferred to a \nsuccessor, prospectively reassigned, or otherwise discharged. The MTRC Term for \neach Covered Upgrade begins on its applicable Upgrade In-Service Date or Regional \nProject In-Service Date and ends on its applicable MTRC Term End Date. Earlier \nBreak-Even remains available if the Total Required Revenue Commitment is satisfied \nbefore the applicable MTRC Term End Date. If LS Power Grid holds a Termination \nFee Balance when the Total Required Revenue Commitment is otherwise discharged, \nthis Agreement shall remain in effect for purposes of the Termination Fee Account"},{"page":218,"startToken":82884,"endToken":83347,"text":"10 \n \nprovisions in Section 3.3.4 until the Termination Fee Balance has been fully credited \nor released. \n3.3. \nTermination. This Agreement may be terminated as follows:  \n3.3.1. \nTermination Before the First Applicable In-Service Date. Before any Large \nLoad-Driven Upgrade reaches its Upgrade In-Service Date and before any LS \nPower Grid-owned CAISO-Assigned Regional Project reaches its Regional \nProject In-Service Date, this Agreement may be terminated upon thirty (30) \nCalendar Days’ written notice if: (a) the Large Load Service Commencement \nDate has not occurred by the Outside Date; (b) Eligible Customer or Large Load \nCustomer cancels or abandons the Large Load Facility or associated request for \nservice; (c) the applicable interconnection, access to the CAISO Controlled Grid, \nor other arrangement necessary for the Large Load Facility is terminated; (d) an \nEvent of Default has occurred and is continuing, or LS Power Grid exercises a \ntermination right arising from default under this Agreement or an applicable \ninterconnection or transmission service agreement; or (e) Eligible Customer fails \nto timely execute, maintain, or provide the documentation, financial security, or \ncredit support required under Sections 4.2, 6.3.6, or 7.1, and such failure \ncontinues for ten (10) Business Days after written notice from LS Power Grid or \ncannot reasonably be cured by the date on which LS Power Grid must commence \nor continue physical construction or incur a material noncancelable procurement \nor construction commitment. Any such termination shall be subject to Applicable \nLaws and Regulations and any required Commission authorization or acceptance \nand shall not release or limit the obligations described in Sections 3.3.2 and \n3.3.3.  \nIf any Large Load-Driven Upgrade has reached its Upgrade In-Service Date or \nany LS Power Grid-owned CAISO-Assigned Regional Project has reached its \nRegional Project In-Service Date identified in Schedule 4, cancellation, \nabandonment, termination, or failure of the Large Load Facility to commence or \ncontinue service shall not terminate this Agreement. Section 3.3.4 and Articles 6 \nand 7 shall apply to each Large Load-Driven Upgrade and LS Power Grid-owned \nCAISO-Assigned Regional Project for which the applicable in-service date has \noccurred. Section 6.3.6 shall govern any assigned share of a project owned by \nanother entity. \n3.3.2. \nPre-In-Service Termination Costs and Construction Security. If the Large \nLoad Facility, its associated request for service, or any associated Large Load-\nDriven Upgrade is cancelled, abandoned, or otherwise terminated before an \napplicable Large Load-Driven Upgrade reaches its Upgrade In-Service Date, \nEligible Customer shall be responsible for all actual and reasonable costs \nprudently incurred or irrevocably committed by LS Power Grid with respect to \nthat Large Load-Driven Upgrade that have not otherwise been recovered by LS \nPower Grid (“Pre-In-Service Termination Costs”). Pre-In-Service Termination \nCosts include costs incurred before or after the applicable cancellation,"},{"page":219,"startToken":83347,"endToken":83751,"text":"11 \n \nabandonment, or termination to wind down, secure, remove, or otherwise address \nthe unfinished Large Load-Driven Upgrade. \nPre-In-Service Termination Costs include, as applicable: \n(a) engineering, design, study, permitting, environmental, siting, land and land-\nright, procurement, construction, testing, project management, legal, \nregulatory, and administrative costs; \n(b) vendor and contractor cancellation charges, termination charges, change-\norder costs, restocking charges, demobilization costs, contract closeout costs, \nand third-party claims; \n(c) the costs of securing, preserving, mothballing, relocating, redeploying, \ndismantling, removing, transporting, storing, selling, or disposing of \nequipment, materials, and partially completed facilities; \n(d) site restoration, environmental remediation, and the restoration or \nmodification of LS Power Grid’s existing facilities made necessary by the \ncancellation or abandonment; \n(e) Allowance for Funds Used During Construction (“AFUDC”) properly \naccrued in accordance with the Commission’s Uniform System of Accounts \nthrough the date on which the applicable construction activities cease or the \napplicable project is determined to have been abandoned, excluding AFUDC \nassociated with amounts of Construction Work in Progress included in rate \nbase or otherwise recovered through rates; and \n(f) any other costs reasonably incurred by LS Power Grid as a direct result of \nthe cancellation, abandonment, suspension, or termination. \nLS Power Grid may draw upon and apply Construction Security to Pre-In-\nService Termination Costs as such costs are incurred or the associated \nobligations become fixed and payable. LS Power Grid may retain Construction \nSecurity until all Pre-In-Service Termination Costs are reasonably determinable \nand LS Power Grid has served on Eligible Customer a final statement reconciling \nPre-In-Service Termination Costs, Construction Security applied, and the \nrecoveries described in this Section, together with supporting information (the \n“Termination Cost Reconciliation”). Construction Security does not limit \nEligible Customer’s underlying liability. Eligible Customer shall pay any \ndeficiency within ten (10) Business Days after receipt of the Termination Cost \nReconciliation. The Termination Cost Reconciliation shall become final in the \nsame manner and within the same period as a Reconciliation Statement under \nSection 6.6, and LS Power Grid shall release any excess Construction Security \nafter the Termination Cost Reconciliation becomes final, including through \nresolution of any dispute under Article 11. Construction Security applied under \nthis Section does not constitute Applied Security Proceeds and does not produce \na TRBAA Credit except to the extent provided in Section 3.3.3(d). Nothing in \nthis Agreement limits LS Power Grid’s right to seek recovery of unpaid Pre-In-\nService Termination Costs through its Formula Rate or otherwise as the \nCommission may authorize."},{"page":220,"startToken":83751,"endToken":84198,"text":"12 \n \nLS Power Grid shall use commercially reasonable efforts to mitigate Pre-In-\nService Termination Costs, provided that LS Power Grid shall not be required to \ntake any action inconsistent with prudent utility practice, safety requirements, \nApplicable Laws and Regulations, existing contractual obligations, or the \nreliable operation of its transmission facilities. The Termination Cost \nReconciliation shall reflect, when realized, applicable vendor refunds, insurance \nrecoveries, net salvage proceeds, reuse or redeployment credits, and other \nrecoveries attributable to the cancelled or abandoned scope, but shall not credit \namounts representing LS Power Grid’s lawfully earned return or carrying costs \nexcept to the extent necessary to prevent duplicate recovery. \nThis Section applies separately to each Large Load-Driven Upgrade. If one or \nmore Large Load-Driven Upgrades have reached their Upgrade In-Service Dates \nwhen the Large Load Facility or associated request for service is cancelled, this \nSection shall apply only to the Large Load-Driven Upgrades and portions of the \nproject that have not reached their Upgrade In-Service Dates. The treatment of \neach Large Load-Driven Upgrade that has reached its Upgrade In-Service Date \nshall be governed by Section 3.3.4 and Articles 6 and 7. \n3.3.3. \nRate Base and Formula Rate Treatment Before an Upgrade In-Service \nDate. To the extent costs associated with a cancelled or abandoned Large Load-\nDriven Upgrade that has not reached its Upgrade In-Service Date have been \nincluded in Construction Work in Progress or any other component of LS Power \nGrid’s rate base, LS Power Grid shall, consistent with the Commission’s \nUniform System of Accounts, its Formula Rate and Protocols, and other \nApplicable Laws and Regulations: \n(a) remove, reclassify, or otherwise exclude such costs from rate base to the \nextent required by applicable Commission accounting and ratemaking \nrequirements; \n(b) reflect that treatment in the next practicable Annual Update and \ncorresponding true-up; \n(c) cease accruing AFUDC to the extent and at the time required by the \nCommission’s accounting requirements; and \n(d) make any adjustment or credit necessary to prevent LS Power Grid from \nrecovering the same cost both through Construction Security or another \npayment by Eligible Customer and through its Formula Rate; provided that \nany such credit to transmission customers shall be recorded in the TRBA and \nflowed through to transmission customers through the TRBAA as provided \nin Section 6.8, and not through a revenue credit or other input to the Formula \nRate. \nAny depreciation, amortization, or other amount recovered through LS Power \nGrid’s Formula Rate that represents recovery of the same underlying capital or \nexpense included in Pre-In-Service Termination Costs shall be reflected, without \nduplication, in the Termination Cost Reconciliation under Section 3.3.2. \nApplication of Construction Security shall not require LS Power Grid to refund"},{"page":221,"startToken":84198,"endToken":84599,"text":"13 \n \nor surrender any return, carrying cost, tax allowance, or other amount lawfully \nrecovered for a period during which LS Power Grid’s investment was properly \nincluded in rate base, except to the extent necessary to prevent duplicate \nrecovery. \nThis Section 3.3.3 applies only to a Large Load-Driven Upgrade, or portion \nthereof, that has not reached its Upgrade In-Service Date. \n3.3.4. \nEffect of Cancellation After an Upgrade or Regional Project In-Service \nDate. After any Large Load-Driven Upgrade reaches its Upgrade In-Service \nDate or any LS Power Grid-owned CAISO-Assigned Regional Project reaches \nits Regional Project In-Service Date specified in Schedule 4, Eligible Customer \nshall promptly notify LS Power Grid if Eligible Customer or Large Load \nCustomer anticipates or becomes aware of the cancellation, abandonment, \ndownsizing, curtailment, permanent cessation, or material reduction of service at \nthe Large Load Facility. \nCancellation, abandonment, suspension, downsizing, termination, or failure of \nthe Large Load Facility to commence or continue service shall not, by itself: \n(a) terminate this Agreement; \n(b) require the removal from rate base of a Large Load-Driven Upgrade or a LS \nPower Grid-owned CAISO-Assigned Regional Project that has reached its \nin-service date; \n(c) reduce or cap any Annual MTRC, Regional Project Allocated ARR, Total \nRequired Revenue Commitment, or remaining Cumulative Revenue \nResponsibility; or \n(d) terminate, reduce, or excuse Eligible Customer’s obligation to pay the \nSupplemental MTRC and prior-period true-up adjustments under Section 6.6, \nmaintain and replenish Operational Security, or satisfy the remaining \nCumulative Revenue Responsibility. \nUpon any effective termination of this Agreement, or upon the permanent \ncessation of service by the Large Load Facility following an applicable Upgrade \nIn-Service Date or Regional Project In-Service Date, Eligible Customer shall pay \nLS Power Grid a one-time lump-sum termination fee equal to the Remaining \nCumulative Revenue Responsibility, less any Supplemental MTRC that has been \nbilled and remains unpaid as of the effective termination or cessation date (the \n“Termination Fee”). LS Power Grid shall calculate the Termination Fee \nseparately for each Covered Upgrade that has reached its applicable in-service \ndate from the most recently served Cumulative Revenue Ledger, updated \nthrough the effective termination or cessation date for then-known Qualifying \nTransmission Revenues, Supplemental MTRC Receipts, Applied Security \nProceeds, billed and unpaid Supplemental MTRC, and any effective prospective \nreassignment. Billed and unpaid Supplemental MTRC excluded from the \nTermination Fee remains separately payable and secured; its later payment, \nsatisfaction through Applied Security Proceeds, or direct recovery shall reduce"},{"page":222,"startToken":84599,"endToken":85092,"text":"14 \n \nthe Cumulative Revenue Responsibility. The Termination Fee is due thirty (30) \nCalendar Days after LS Power Grid’s invoice. It is an accelerated contractual \ntermination charge, not a penalty or consideration for future transmission service. \nIts receipt in full discharges only the remaining Cumulative Revenue \nResponsibility included in the fee. The Termination Fee is not a Supplemental \nMTRC Receipt, Applied Security Proceeds, prepayment for future transmission \nservice, customer advance for construction, contribution in aid of construction, \nor reduction to rate base. LS Power Grid shall administer the Termination Fee \nonly as provided in Section 3.3.4 and Article 6. \nEach Large Load-Driven Upgrade that has reached its Upgrade In-Service Date \nand each LS Power Grid-owned CAISO-Assigned Regional Project for which an \nAnnual MTRC has been established shall remain subject to the applicable \nFormula Rate and Protocols for so long as it is properly includable in rate base \nunder applicable Commission requirements. The associated payment, Security, \nreconciliation, and TRBAA Credit obligations shall continue in accordance with \nArticles 6 and 7, subject to any prospective reassignment or adjustment \nauthorized under the CAISO Tariff or a Commission-accepted methodology, or \ntransfer to a Successor Eligible Customer under Section 6.10. \nLS Power Grid shall hold each Termination Fee, and any proceeds of \nOperational Security applied to its payment, in a separately identified, interest \nbearing Termination Fee Account for the applicable Covered Upgrade. The \namounts in that account, together with actual earnings and less amounts credited \nor released, constitute the “Termination Fee Balance.” For each Covered \nUpgrade, the Annual Termination Fee Credit for each Rate Year remaining in the \nMTRC Term shall equal the applicable Annual MTRC, prorated for any partial \nRate Year, but shall not exceed the then-available Termination Fee Balance. In \nthe final Rate Year of the MTRC Term, the Annual Termination Fee Credit shall \ninclude the entire remaining Termination Fee Balance, including actual earnings, \nso that the Termination Fee Account is reduced to zero, subject to any amount \nrequired to be released under this Section 3.3.4. LS Power Grid shall include \neach Annual Termination Fee Credit in the TRBAA only for the Rate Year for \nwhich it is scheduled. The Termination Fee Balance shall be separately \naccounted for as a deferred liability pending its scheduled annual TRBAA \ntreatment, shall not be included in rate base, and shall not itself be a TRBAA \nCredit or Formula Rate input. If a prospective reassignment becomes effective \nafter receipt of a Termination Fee, LS Power Grid shall release the portion of the \nTermination Fee Balance attributable to the reassigned responsibility, together \nwith actual earnings, and prospectively adjust the remaining Annual Termination \nFee Credits. \nIf the Commission subsequently requires LS Power Grid to retire, remove, \nreclassify, or exclude all or a portion of an in-service Large Load-Driven \nUpgrade or LS Power Grid-owned CAISO-Assigned Regional Project from rate \nbase, LS Power Grid shall make corresponding prospective adjustments to the \napplicable Annual MTRC, Regional Project Allocated ARR, Total Required"},{"page":223,"startToken":85092,"endToken":85532,"text":"15 \n \nRevenue Commitment, Cumulative Revenue Responsibility, Supplemental \nMTRC, and Operational Security. Such adjustments shall prevent Eligible \nCustomer from remaining responsible under this Agreement for costs that are no \nlonger included in LS Power Grid’s transmission revenue requirement, without \nrequiring a refund or reopening of amounts properly determined for a prior Rate \nYear. \nIf, at the time of cancellation or abandonment, one or more Large Load-Driven \nUpgrades have reached their Upgrade In-Service Dates or a LS Power Grid-\nowned CAISO-Assigned Regional Project has reached its project in-service date, \nand one or more other upgrades or project shares have not, Sections 3.3.2 and \n3.3.3 shall apply to Large Load-Driven Upgrades and project scope that have not \nreached their applicable in-service dates; this Section 3.3.4 and Articles 6 and 7 \nshall apply to the upgrades and LS Power Grid-owned project shares that have \nreached their applicable in-service dates; and Section 6.3.6 shall continue to \ngovern any assigned share of a project owned by another entity. \n3.3.5. \nMutual Termination. The Parties may terminate this Agreement by mutual \nwritten consent only after addressing all incurred construction costs, the \ncontinuing Cumulative Revenue Responsibility, Supplemental MTRC amounts, \nprior-period true-up adjustments, and Security. No termination is effective to \nextinguish such obligations unless expressly accepted or approved by FERC. \n3.4. \nRegulatory Effect of Termination. No termination shall become effective until the \nParties comply with all Applicable Laws and Regulations, including any required \nnotice to or acceptance by FERC. A regulatory rejection, cancellation, downsizing, \ncurtailment, cessation, Force Majeure event, or termination shall not excuse incurred \nconstruction costs or the obligations arising on or after an applicable Upgrade In-\nService Date or Regional Project In-Service Date unless FERC expressly determines \notherwise. \n3.5. \nEffect of Termination. Termination does not release Eligible Customer from \nobligations arising under Articles 4, 6, or 7, including future annual Supplemental \nMTRC payments, prior-period true-up adjustments, and Security maintenance and \nreplenishment, until the Cumulative Revenue Responsibility is finally satisfied or \ntransferred in accordance with this Agreement. Upon LS Power Grid’s receipt of the \nTermination Fee in full, no further Supplemental MTRC shall accrue for any period \nafter the effective termination or cessation date, subject to final true-ups and \nreconciliation for periods before that date. Security does not limit the underlying \nliability. The Large Load Customer’s information, notice, authorization, and \ncooperation obligations stated in its Limited Acknowledgment also survive.  \n4. Transmission Project \n4.1. \nDesign, Procurement, and Construction. Subject to Eligible Customer’s execution \nof this Agreement and the relevant Interconnection Agreement, delivery of \nConstruction Security under Section 7.1, and satisfaction of Section 4.2, LS Power"},{"page":224,"startToken":85532,"endToken":85925,"text":"16 \n \nGrid shall design, procure, construct, install, and own the Large Load-Driven \nUpgrades described in the relevant Interconnection Agreement and Schedule 1, using \nreasonable efforts to meet the applicable construction schedule and expected Upgrade \nIn-Service Dates.  \nEligible Customer shall maintain Construction Security under Section 7.1 sufficient to \nsecure LS Power Grid’s incurred and committed construction costs and the Pre-In-\nService Termination Costs described in Section 3.3.2. Construction Security shall \napply separately to each Large Load-Driven Upgrade until that upgrade reaches its \nUpgrade In-Service Date and the conditions for release or conversion under Section \n7.2 have been satisfied. \nIf different Large Load-Driven Upgrades reach their Upgrade In-Service Dates on \ndifferent dates, Construction Security shall continue to apply to each Large Load-\nDriven Upgrade and portion of the project that has not reached its Upgrade In-Service \nDate, notwithstanding the release or conversion of Construction Security attributable \nto an upgrade that has entered service. \nUpon cancellation, abandonment, or termination, before an applicable Large Load-\nDriven Upgrade reaches its Upgrade In-Service Date, LS Power Grid may draw, \nretain, and apply Construction Security in accordance with Sections 3.3.2 and 7.1 and \nthe relevant Interconnection Agreement. LS Power Grid shall not be required to take \naction inconsistent with its safety practices, design criteria, construction procedures, \nApplicable Laws and Regulations, or the reliable operation of its transmission \nfacilities. \n4.2. \nAffected Systems \n4.2.1. Identification and Coordination. Eligible Customer shall cooperate with LS \nPower Grid, CAISO, each affected Participating TO, and each other Affected \nSystem Owner in identifying and studying potential impacts of the interconnection \nor service of the Large Load Facility on any Affected System. \n4.2.2. Required Affected System Arrangements. For each Affected System Upgrade \nidentified through an applicable study, Eligible Customer shall timely enter into and \nmaintain an Affected System Arrangement with the applicable Affected System \nOwner. Each Affected System Arrangement shall address, as applicable: \n(a) study, engineering, design, procurement, construction, testing, and \nenergization responsibilities; \n(b) responsibility for the costs of the Affected System Upgrade; \n(c) responsibility for cancellation, abandonment, demobilization, equipment \nremoval, disposition, remediation, restoration, AFUDC, and other costs \nresulting from cancellation or failure of the Large Load Facility to proceed; \n(d) construction-period and post-in-service payment obligations and financial \nsecurity or credit support sufficient to protect the Affected System Owner \nand its other customers against cost shifting;"},{"page":225,"startToken":85925,"endToken":86351,"text":"17 \n \n(e) applicable invoicing, reconciliation, true-up, refund, and release procedures; \nand \n(f) any Commission filing, acceptance, or other regulatory authorization \nrequired for the Affected System Arrangement. \n4.2.3. Evidence Before LS Power Grid Construction. At least thirty (30) Calendar \nDays before LS Power Grid’s scheduled commencement of physical construction, \nand in all events before any notice to proceed for physical construction may occur or \nLS Power Grid incurs a material noncancelable procurement or construction \ncommitment, Eligible Customer shall provide LS Power Grid: \n(a) a complete copy of each executed Affected System Arrangement; \n(b) evidence that all financial security or credit support required to be effective \nbefore construction under each Affected System Arrangement has been provided; \n(c) evidence of any required Commission filing, acceptance, or other regulatory \nauthorization; and \n(d) a certification that each Affected System Arrangement remains in full force and \neffect and that Eligible Customer is not in default thereunder. \nLS Power Grid may permit specifically identified preliminary engineering, \nprocurement, or other limited activities to proceed before satisfaction of this Section \nby written notice. Such permission shall not waive any requirement of this Section \nor obligate LS Power Grid to commence or continue physical construction. \n4.2.4. Continuing Obligation. Eligible Customer shall promptly provide LS Power \nGrid a copy of any material amendment, replacement, termination notice, default \nnotice, demand upon financial security or credit support, or other material notice \nconcerning an Affected System Arrangement. Eligible Customer shall maintain each \nrequired Affected System Arrangement and all financial security or credit support \nrequired thereunder until the obligations secured by that arrangement have been \nfinally satisfied, transferred, or released. \n4.2.5. Later-Identified Affected Systems. If an Affected System or Affected System \nUpgrade is identified after LS Power Grid has commenced work, Eligible Customer \nshall promptly enter into the required Affected System Arrangement and provide the \ndocumentation required by this Section. Subject to the applicable tariffs and \nagreements, LS Power Grid may suspend further work, procurement, energization, \nor service to the extent reasonably necessary to avoid additional exposure until the \nrequirement is satisfied. \n4.2.6. Failure to Satisfy Requirements. Eligible Customer’s failure to timely execute, \nmaintain, or provide evidence of an Affected System Arrangement or required \nfinancial security or credit support constitutes a material default under this \nAgreement. Subject to Applicable Laws and Regulations and the applicable tariffs \nand agreements, LS Power Grid may: (a) decline to commence or continue \nconstruction or material procurement commitments; (b) suspend work, energization, \nor service; (c) exercise the termination right in Section 3.3.1; and (d) recover all"},{"page":226,"startToken":86351,"endToken":86800,"text":"18 \n \nresulting Pre-In-Service Termination Costs and other amounts payable under this \nAgreement. \n4.2.7. Confidentiality. Documents provided under this Section shall be subject to the \nconfidentiality protections in Section 6.12. Eligible Customer may redact \ncommercially sensitive provisions unrelated to the requirements of this Section, but \nmay not redact information reasonably necessary for LS Power Grid to verify the \nscope, effectiveness, cost responsibility, financial security or credit support, \ntermination protection, or continuing enforceability of the Affected System \nArrangement. \n4.2.8. Separate Administration. Costs, revenues, payments, and financial security or \ncredit support arising under an Affected System Arrangement shall be administered \nunder that arrangement and the applicable Affected System Owner’s tariff. Such \namounts shall not be included in any Annual MTRC, Total Required Revenue \nCommitment, Supplemental MTRC, Cumulative Revenue Responsibility, or \nTRBAA Credit, except to the extent expressly authorized by the Commission and \nnecessary to prevent duplicate recovery. \n5. Regulatory Approval(s) \n5.1. \nFERC Filing. This Agreement is the form of agreement required under Sections 10.9 \nand 10A.6 of the TO Tariff as a condition of LS Power Grid’s design, procurement, \nand construction of Large Load-Driven Upgrades. Consistent with 18 C.F.R. § 35.1(g), \na conforming, executed Agreement entered into under the Commission-accepted pro \nforma with populated Schedules generally shall not require an individual filing under \nSection 205 of the Federal Power Act. LS Power Grid shall file an unexecuted \nAgreement or an Agreement containing a material deviation, and any other agreement \nrequired to be filed by Commission order or rule. If FERC does not accept a required \nfiling in its entirety, the Parties shall use reasonable efforts to amend and refile it; \nregulatory rejection does not excuse incurred construction costs or payment, Security, \nand true-up obligations for facilities placed in service, except to the extent FERC \nexpressly determines otherwise.  \n6. Cost Recovery  \n6.1. \nCost Recovery and Minimum Contribution. LS Power Grid shall include the Large \nLoad-Driven Upgrades in its Formula Rate to the extent the project costs are properly \nincludable under the Formula Rate, the Protocols, and applicable law. This Agreement \ndoes not remove any Covered Upgrade from rate base or require a capital-cost \nreimbursement. The fixed twenty (20)-year Annual MTRC for each Covered Upgrade \nis instead calculated under the MTRC Calculation Template in Schedule 5, initially \nusing estimated cost and then using final incurred cost on the applicable Final MTRC \nDetermination Date. LS Power Grid shall recover its formula-rate revenue requirement \nthrough TAC and shall flow TRBAA Credits through to transmission customers \nthrough the TRBAA as provided in Section 6.8. Amounts received under this \nAgreement are not inputs to the Formula Rate, and this Agreement does not require"},{"page":227,"startToken":86800,"endToken":87262,"text":"19 \n \nany modification of the Formula Rate. Eligible Customer shall pay a Supplemental \nMTRC only to the extent forecast or actual Qualifying Transmission Revenues are less \nthan the applicable Annual MTRC. The Annual MTRC is a revenue floor, not an \nadditive charge, and does not alter CAISO cost allocation or LS Power Grid plant \naccounting. \nEligible Customer acknowledges that LS Power Grid will incur costs and undertake \nplanning, engineering, procurement, and construction in reliance on the Large Load \nFacility’s development and operation. Eligible Customer therefore accepts the \nwholesale payment and Security obligations in this Agreement. Any retail recovery \nfrom the Large Load Customer remains governed exclusively by applicable state law \nand Eligible Customer’s retail arrangements. \nAffected System Upgrades and the associated costs, revenues, payments, and financial \nsecurity or credit support are governed by Section 4.2 and the applicable Affected \nSystem Arrangement. Unless expressly authorized by the Commission, no Affected \nSystem Upgrade or associated revenue requirement shall be included in LS Power \nGrid’s Annual MTRC, Total Required Revenue Commitment, Supplemental MTRC, \nCumulative Revenue Responsibility, or TRBAA Credit. \n6.2. \nQualifying Transmission Revenues. For each Rate Year or partial Rate Year, \n“Qualifying Transmission Revenues” means wholesale transmission revenues paid by \nor on behalf of Eligible Customer under the CAISO Tariff or another Commission-\naccepted arrangement that are attributable to service to the Large Load Facility and \nreduce transmission revenues otherwise collected from CAISO customers or directly \ncredit LS Power Grid’s Net Revenue Requirement. Qualifying Transmission Revenues \ninclude: (a) the portion of TAC revenue attributable to the Large Load Facility and \nallocable to LS Power Grid under the reproducible methodology in Schedule 2; and (b) \nWheeling Access Charges and other wholesale transmission-access, wheeling, or \ntransmission-service charges paid to CAISO, a Participating TO, or a non-PTO \ntransmission or load-serving entity for deliveries serving the Large Load Facility, but \nonly to the extent they reduce transmission revenues otherwise collected through TAC \nor directly credit LS Power Grid’s Net Revenue Requirement and are not otherwise \nreflected as a credit in calculating the Annual MTRC, the Supplemental MTRC, or a \nTRBAA Credit. Qualifying Transmission Revenues do not include Supplemental \nMTRC Receipts, Applied Security Proceeds, retail charges, or amounts that do not \nreduce transmission revenues otherwise collected from CAISO customers or directly \ncredit LS Power Grid’s Net Revenue Requirement. \n6.3. \nAnnual MTRC and Allocation.  \n6.3.1. Upgrade-Specific MTRC Calculation. LS Power Grid shall calculate a separate \nAnnual MTRC for each Covered Upgrade solely under the MTRC Calculation \nTemplate in Schedule 5. Before the Final MTRC Determination Date, LS Power \nGrid shall calculate and update the Estimated Annual MTRC from the then-current \nestimated capital cost. Within one (1) year after the applicable Covered Upgrade \nenters service, when the actual capital cost of that Covered Upgrade is known and"},{"page":228,"startToken":87262,"endToken":87809,"text":"20 \n \nall costs associated with its estimated capital cost have been accounted for, LS \nPower Grid shall establish the Final Annual MTRC using final incurred capital cost \nand the Project-Specific Levelized Fixed Charge Rate calculated under Schedule 5. \nSchedule 5 shall calculate the Project-Specific Levelized Fixed Charge Rate by: (i) \ndetermining the present-worth revenue requirement using the applicable capital \nstructure, cost of debt, return on equity, federal and state income-tax rates, income-\ntax conversion factor, and levelized-depreciation schedule; (ii) applying a \ndepreciation rate of five percent (5%) of the applicable capital cost input in each \nyear of the twenty (20)-year MTRC Term to calculate present-worth federal and \nstate income-tax depreciation benefits; (iii) annualizing the resulting present-worth \nrevenue requirement over the MTRC Term using the applicable after-tax discount \nrate and annualization factor; and (iv) adding the fixed expense allocator specified \nin Schedule 5. The Final Annual MTRC shall equal the applicable final incurred \ncapital cost multiplied by the resulting Project-Specific Levelized Fixed Charge \nRate. No component reflected in the Project-Specific Levelized Fixed Charge Rate \nor the fixed expense allocator shall be added again as a separate component of the \nAnnual MTRC. The Final Annual MTRC and the Schedule 5 inputs used to \ncalculate it are fixed as of the Final MTRC Determination Date and shall not be \nrecalculated for later changes in actual cost, Formula Rate inputs, or other cost-of-\nservice components, except to correct an error or fraud, to implement an effective \nprospective reassignment, to implement a final FERC order applicable to the \ncalculation, or to reflect, prospectively, a change in (i) LS Power Grid’s return on \nequity component of its Formula Rate, resulting from a final FERC order accepting \nor approving such change, or (ii) applicable federal or state income tax rates or \nincome tax law enacted after the Final MTRC Determination Date; provided that, \nthe five percent (5%) annual levelized-depreciation schedule in Schedule 5 shall \nremain fixed for the MTRC Term unless a final FERC order requires otherwise. If \nLS Power Grid adjusts the Final Annual MTRC after the Final MTRC \nDetermination Date pursuant to the foregoing provision, LS Power Grid shall update \nthe MTRC Calculation Template and serve it upon Eligible Customer in accordance \nwith the notice provisions contained in this Agreement. Upon such service to \nEligible Customer, the updated MTRC Calculation Template shall replace the \nexisting MTRC Calculation Template in its entirety and become effective on the \ndate of such service. The foregoing effectiveness of an updated MTRC Calculation \nTemplate does not preclude Eligible Customer from disputing any change to the \nMTRC Calculation Template pursuant to Article 11 of this Agreement. Any \nresulting adjustment to the Total Required Revenue Commitment shall apply only to \nthe Rate Years remaining in the MTRC Term as provided in Section 6.7. \nEach Annual MTRC shall apply for its separate twenty (20)-year MTRC Term, with \nthe initial and final partial Rate Years prorated based on the number of monthly \nBilling Periods in the applicable Rate Year during which the Covered Upgrade is in \nservice. Schedule 1 shall identify the initial Estimated Annual MTRC and initial \nprojected Total Required Revenue Commitment for each Large Load-Driven \nUpgrade, and Schedule 5 shall record the Final MTRC Determination Date, Final \nAnnual MTRC, Total Required Revenue Commitment, and the completed"},{"page":229,"startToken":87809,"endToken":88251,"text":"21 \n \ncalculation for each Covered Upgrade. Schedule 4 shall provide the corresponding \nproject-specific information for a LS Power Grid-owned CAISO-Assigned Regional \nProject, if applicable. \n6.3.2. Initial Allocation. Schedule 1 shall identify, separately for each Large Load-\nDriven Upgrade, the percentage of the upgrade initially allocated to the Large Load \nCustomer under this Agreement (the “Initial Allocation Percentage”). The Initial \nAllocation Percentage shall be determined using the applicable final study and \nallocation methodology and shall account for: \n(a) Large Load Customers studied individually, jointly, or in a cluster; \n(b) the extent to which two or more Large Load Customers caused the need for \nor share a Large Load-Driven Upgrade; \n(c) differing requested service levels, development phases, and facility \nconfigurations; and \n(d) any portion of the facility determined at the outset to serve other \ntransmission system needs or customers. \nThe aggregate percentages allocated to all Large Load Customers for a Large Load-\nDriven Upgrade shall not exceed one hundred percent (100%). Any portion not \nallocated to a Large Load Customer shall be excluded from the Annual MTRC \nallocable to any Large Load Customer and remain subject to the otherwise-\napplicable CAISO cost allocation and rate recovery requirements. \n6.3.3. Applicable Allocation Percentage. For each Large Load-Driven Upgrade, the \n“Applicable Allocation Percentage” shall equal the Initial Allocation Percentage \nidentified in Schedule 1, as adjusted prospectively by any reassignment effective \nunder Section 6.9 or as otherwise required by a final Commission order or \napplicable tariff provision. A cancellation, abandonment, downsizing, curtailment, \npermanent cessation, or material reduction of service by the Large Load Customer \nshall not, by itself, reduce the Applicable Allocation Percentage. \n6.3.4. Annual MTRC Allocation. The Annual MTRC applicable to Eligible Customer \nshall equal the Annual MTRC for the Covered Upgrade as a whole multiplied by the \nApplicable Allocation Percentage; provided that, where Schedule 5 applies that \npercentage to capital cost or otherwise calculates the Annual MTRC for an already \nallocated project share, the resulting Annual MTRC is already allocated and the \npercentage shall not be applied again. LS Power Grid shall maintain the calculation \nseparately by Large Load Customer, Large Load Facility, and Covered Upgrade. \nThe aggregate Annual MTRCs allocated to all large load customers shall not exceed \nthe Annual MTRC for the Covered Upgrade as a whole. \n6.3.5. CAISO-Assigned Regional Projects Owned by LS Power Grid. For each \nCAISO-Assigned Regional Project owned by LS Power Grid and included in its \nFormula Rate, LS Power Grid shall calculate separately the Regional Project \nAllocated ARR attributable to the specific share formally assigned to the Large \nLoad Facility. The Regional Project Allocated ARR shall be calculated solely under"},{"page":230,"startToken":88251,"endToken":88743,"text":"22 \n \nthe MTRC Calculation Template in Schedule 5, using LS Power Grid’s allocated \nshare of the project’s estimated capital cost before the Final MTRC Determination \nDate and its allocated share of final incurred capital cost on that date, and shall be \nestablished, updated, and fixed in the same manner and on the same schedule that \nSection 6.3.1 provides for other Covered Upgrades. The resulting Annual MTRC \nshall be included in the Supplemental MTRC calculation and the Total Required \nRevenue Commitment beginning on the Regional Project In-Service Date. The \nallocated share shall be determined under the applicable allocation under the CAISO \nTariff or Commission-accepted methodology and the project-specific information in \nSchedule 4. No portion assigned to other customers, other facilities, or broader \nregional needs shall be included. Before the Regional Project In-Service Date, any \ncosts of a cancelled or abandoned project shall be treated under the applicable \nCAISO Tariff, Commission order, and any abandoned-plant incentive specifically \nauthorized for that project. This Agreement does not create a separate pre-service \npayment or Construction Security obligation solely because CAISO has assigned a \nregional project share to Large Load Facility. Any pre-service payment, \ncontribution, or security required by the CAISO Tariff, an applicable \nInterconnection Agreement, or another Commission-accepted arrangement remains \ndue under that authority and shall be identified in Schedule 4. Any abandoned-plant \nrecovery, customer payment, or security proceeds shall receive the accounting and \nrate treatment required by the Commission, and any credit necessary to prevent \nduplicate recovery of the same costs shall be recorded in the TRBA and flowed \nthrough to transmission customers through the TRBAA as provided in Section 6.8. \nAny prospective adjustment or reassignment of the share assigned to the Large Load \nFacility shall occur only as provided by the CAISO Tariff or a Commission-\naccepted methodology. Rate base inclusion, depreciation, and other accounting for \nthe underlying project share remain subject to the Formula Rate, the Protocols, and \nthe Commission's Uniform System of Accounts; this Section 6.3.5 governs only the \ncalculation of the Annual MTRC applicable to the Large Load Facility under this \nAgreement. \n6.3.6. CAISO-Assigned Regional Projects Owned by Another Entity. If CAISO \nformally assigns a specific share of a CAISO-Assigned Regional Project to the \nLarge Load Facility and that project is not owned by LS Power Grid or is not \nincluded in LS Power Grid’s Formula Rate, Eligible Customer shall satisfy the \nassigned share under the CAISO Tariff or enter into and maintain the required \narrangement with the project owner or other responsible entity. The arrangement \nshall address, as applicable, payment of assigned costs and revenue responsibility, \nconstruction and cancellation obligations, security or credit support, invoicing, \nreconciliation, true-up, refund, release, and any required regulatory filing or \nacceptance. Eligible Customer shall provide LS Power Grid a copy of the executed \narrangement or other evidence reasonably sufficient to demonstrate compliance, \nincluding the amount and basis of the assigned share, the billing party, payment \nterms, and required security."},{"page":231,"startToken":88743,"endToken":89221,"text":"23 \n \nEligible Customer shall provide the required arrangement or evidence by the \ndeadline specified in Schedule 4, which shall be no later than the earliest applicable \ndeadline under the CAISO Tariff or project-owner arrangement and, where the \nassignment is known before construction, before the project owner commences \nconstruction. If CAISO makes the assignment after construction has commenced or \nafter the project enters service, Eligible Customer shall comply within the period \nspecified by CAISO or the project owner and provide evidence to LS Power Grid \npromptly. Failure to comply is an Event of Default if not cured as provided in \nSection 7.11(c). \nAmounts owed to another project owner are not included in any Annual MTRC, \nRegional Project Allocated ARR, Total Required Revenue Commitment, \nSupplemental MTRC, Cumulative Revenue Responsibility, or TRBAA Credit \nunless the amount is included in LS Power Grid’s Formula Rate and Schedule 4 \nexpressly identifies it as LS Power Grid’s assigned share. The applicable tariff or \nproject-owner arrangement shall identify and apply any credits required to prevent \nduplicate recovery of the same assigned share through both a direct charge and a \ntransmission rate. Payments to another owner satisfy only the corresponding \nobligation under that tariff or arrangement and do not reduce the Cumulative \nRevenue Responsibility owed to LS Power Grid unless they satisfy the same \nunderlying obligation included in LS Power Grid’s Formula Rate. The Eligible \nCustomer’s obligations under this Section survive termination of this Agreement \nand cessation of service until the assigned share has been paid or assumed by a \nsuccessor and the obligation has been discharged, transferred, or released under the \napplicable CAISO Tariff or project-owner arrangement by the entity entitled to \nenforce it. \n6.4. \nSupplemental MTRC. Beginning on the in-service date of each Covered Upgrade, \nEligible Customer shall pay the positive shortfall, if any, between the applicable \nAnnual MTRC, prorated for a partial Rate Year based on the number of monthly \nBilling Periods in that Rate Year during which the Covered Upgrade is in service, and \nQualifying Transmission Revenues attributable to the Large Load Facility during the \ncorresponding Rate Year or partial Rate Year. Until the Final MTRC Determination \nDate, billing shall use the Estimated Annual MTRC. Upon initial finalization, the Final \nAnnual MTRC shall apply back to the applicable in-service date, and estimated \ncharges shall be reconciled in the next Reconciliation Statement under Section 6.6. \nThereafter, the calculation shall use the Final Annual MTRC, subject to adjustments \npermitted by Section 6.3.1. Qualifying Transmission Revenues attributable to a \nspecific Covered Upgrade shall be applied to that upgrade. Qualifying Transmission \nRevenues not attributable to a specific Covered Upgrade shall be allocated among the \nCovered Upgrades then in their MTRC Terms pro rata based on their respective \nprorated Annual MTRCs for the applicable period. \nThe calculation may be expressed as: \nSupplemental MTRC = max (applicable Annual MTRC − Qualifying Transmission \nRevenues, $0)."},{"page":232,"startToken":89221,"endToken":89726,"text":"24 \n \nThe Annual MTRC is not an annual true-up of project cost or Formula Rate inputs. \nAnnual reconciliation is limited to Qualifying Transmission Revenues, Supplemental \nMTRC invoices and receipts, Applied Security Proceeds, TRBAA Credits, partial-year \nproration, effective prospective reassignment, and correction of error, fraud, a final \nFERC order applicable to the calculation, and any prospective recalculation of the \nFinal Annual MTRC permitted by Section 6.3.1. \n6.5. \nInvoice. With each Annual Projection, LS Power Grid shall forecast Qualifying \nTransmission Revenues and calculate the projected Supplemental MTRC using the \napplicable fixed or estimated Annual MTRC from Schedule 5, increased or reduced by \nany prior-period true-up adjustment under Section 6.6. LS Power Grid shall invoice \nthe forecasted Supplemental MTRC for the applicable Rate Year or partial Rate Year \nin equal monthly installments for each Billing Period in that Rate Year during which \nthe Covered Upgrade is in service; for a full Rate Year, the projected Supplemental \nMTRC shall be invoiced in twelve (12) equal monthly installments. Each installment \nis payable within thirty (30) Calendar Days after receipt of the invoice. If a Covered \nUpgrade reaches its applicable in-service date during a Rate Year for which the \nAnnual Projection did not include a projected Supplemental MTRC for that Covered \nUpgrade, LS Power Grid shall promptly forecast Qualifying Transmission Revenues \nand invoice the prorated Supplemental MTRC for the remaining Billing Periods of that \nRate Year. LS Power Grid shall include the projected Supplemental MTRC, including \nany prior-period true-up adjustment, as a Forecast TRBAA Credit in the next annual \nTRBAA under Section 6.8. Only cash actually received by LS Power Grid, or Applied \nSecurity Proceeds actually applied by LS Power Grid, constitutes an actual receipt for \npurposes of Sections 6.6 through 6.8. Concurrently with each Annual Projection, LS \nPower Grid shall provide Eligible Customer upgrade-specific workpapers showing the \napplicable Annual MTRC, forecast Qualifying Transmission Revenues, projected \nSupplemental MTRC, any prior-period true-up adjustment, Forecast TRBAA Credit, \nTotal Required Revenue Commitment, and Required Operational Security. \n6.6. \nAnnual Reconciliation Statement. In connection with each Annual Update, LS \nPower Grid shall determine the actual Supplemental MTRC obligation using actual \nQualifying Transmission Revenues and the applicable fixed or estimated Annual \nMTRC from Schedule 5. LS Power Grid shall identify, by Eligible Customer and \nCovered Upgrade, the opening unpaid billed Supplemental MTRC balance, \nSupplemental MTRC invoiced during the Rate Year, cash received by LS Power Grid, \nApplied Security Proceeds applied to identified obligations, direct recoveries, closing \nunpaid billed balance, and each Annual Termination Fee Credit. Concurrently with \neach Annual Update, LS Power Grid shall serve on Eligible Customer a Reconciliation \nStatement containing those determinations, the updated Cumulative Revenue Ledger, \nRequired Operational Security recalculated under Section 7.4, a reconciliation of the \nForecast TRBAA Credit to actual amounts recorded in the TRBA, and supporting \nworkpapers. An unpaid Supplemental MTRC remains due from Eligible Customer \nand, when later received or satisfied through Applied Security Proceeds, is recorded in \nthe TRBA only in the Rate Year of receipt or application. The Reconciliation"},{"page":233,"startToken":89726,"endToken":90236,"text":"25 \n \nStatement shall not reopen the Final Annual MTRC or Total Required Revenue \nCommitment except as expressly allowed by Section 6.3.1. \nThe difference between the Supplemental MTRC billed for a Rate Year, excluding any \nprior-period true-up adjustment included in that billing, and the actual Supplemental \nMTRC determined in the Reconciliation Statement for that Rate Year shall constitute a \n“prior-period true-up adjustment,” which shall increase (if under-billed) or reduce (if \nover-billed) the projected Supplemental MTRC invoiced under Section 6.5 following \nthe next Annual Projection. If no further Supplemental MTRC will be invoiced under \nthis Agreement, LS Power Grid shall invoice any under-billed amount, payable within \nthirty (30) Calendar Days after receipt of the invoice, and shall refund any over-billed \namount to Eligible Customer within thirty (30) Calendar Days after service of the \nReconciliation Statement. No interest shall accrue on the Supplemental MTRC or on \nany prior-period true-up adjustment, invoice, refund, or other adjustment of the \nSupplemental MTRC between LS Power Grid and Eligible Customer. Any refund to \nEligible Customer of an amount previously recorded as a TRBAA Credit shall be \nreversed in the TRBA when paid, and any under-billed amount later received shall be \nrecorded in the TRBA when received, in each case as provided in Section 6.8. Any \namount returned by LS Power Grid to transmission customers through the TRBAA \nshall include interest as provided in Section 5.3 of the TO Tariff. \nA Reconciliation Statement shall become final on the earlier of (a) Eligible \nCustomer’s written acceptance of the Reconciliation Statement or (b) ninety (90) \nCalendar Days after service, unless before that date Eligible Customer serves a Notice \nof Dispute under Section 11.1 identifying with reasonable specificity the items \ndisputed. If a Notice of Dispute is timely served, the undisputed portions of the \nReconciliation Statement shall become final on the date that would otherwise apply, \nand the disputed items shall become final upon the applicable Dispute Determination \nunder Section 11.5. A final Reconciliation Statement may be revised only to \nimplement a Dispute Determination, to reflect CAISO resettlements or other corrected \ndata as provided in Schedule 2, or to correct errors or fraud. Finality of a \nReconciliation Statement under this Agreement does not affect the Commission’s \nreview and approval of any TRBAA. \nFor purposes of this Agreement, Supplemental MTRC Receipts exclude Applied \nSecurity Proceeds. Applied Security Proceeds shall be counted only when LS Power \nGrid applies such proceeds to satisfy an identified payment obligation and shall reduce \nthat obligation dollar-for-dollar. The posting, maintenance, replenishment, drawing, or \nholding of Security shall not, by itself, constitute a Supplemental MTRC Receipt, an \nApplied Security Proceed, satisfaction of the Cumulative Revenue Responsibility, or a \nTRBAA Credit. \nNo amount shall be counted both as a Supplemental MTRC Receipt and as an Applied \nSecurity Proceed. If LS Power Grid receives payment of an obligation previously \nsatisfied through Applied Security Proceeds, LS Power Grid shall not count the \nsubsequent payment toward the Cumulative Revenue Responsibility or a TRBAA \nCredit and shall instead return the duplicative amount, release an equivalent amount of"},{"page":234,"startToken":90236,"endToken":90644,"text":"26 \n \nSecurity, or, with supporting notice to Eligible Customer, apply the amount to another \nthen-outstanding obligation under this Agreement. \n6.7. \nCumulative Revenue Responsibility and Break-Even. LS Power Grid shall \nmaintain a Cumulative Revenue Ledger for each Covered Upgrade and shall update it \nat least annually in connection with the Annual Update. LS Power Grid shall include \nan updated Cumulative Revenue Ledger statement, with supporting workpapers, in \neach Reconciliation Statement served on Eligible Customer under Section 6.6. For \neach Covered Upgrade, the Total Required Revenue Commitment equals the Final \nAnnual MTRC multiplied by twenty (20), adjusted only for partial-year proration and \nany prospective recalculation of the Final Annual MTRC permitted by Section 6.3.1, \nwhich shall apply only to the Rate Years remaining in the MTRC Term after the \nrecalculation takes effect. Until the Final MTRC Determination Date, the projected \nTotal Required Revenue Commitment shall equal the Estimated Annual MTRC \nmultiplied by twenty (20). \nRemaining Cumulative Revenue Responsibility equals the applicable Total Required \nRevenue Commitment less: \n(a) cumulative Qualifying Transmission Revenues; \n(b) cumulative Supplemental MTRC Receipts; \n(c) cumulative Applied Security Proceeds; \n(d) effective prospective reassignment credits; and \n(e) cash amounts received and applied toward the Termination Fee, excluding any \nportion satisfied through Applied Security Proceeds already counted under \nclause (c). \nEach dollar shall be entered in the Cumulative Revenue Ledger only once. \nSupplemental MTRC Receipts shall exclude Applied Security Proceeds. Applied \nSecurity Proceeds shall be entered only when applied to an identified Supplemental \nMTRC, prior-period true-up adjustment, Termination Fee, or other payment obligation \nunder Article 6 or Section 3.3.4. Security that is posted, drawn but not applied, held as \na deferred liability, replenished, replaced, or returned shall not reduce the Cumulative \nRevenue Responsibility. Annual Termination Fee Credits and the corresponding \nTermination Fee Balance shall be separately identified in the Reconciliation Statement \nand in the workpapers required under Section 6.8 and shall not again reduce the \nCumulative Revenue Responsibility. \nIf an amount previously credited in the Cumulative Revenue Ledger is subsequently \nrefunded, reversed, disallowed, or otherwise ceases to satisfy the applicable obligation, \nLS Power Grid shall make a corresponding adjustment to the ledger, subject to the \nfinality and no-revival provisions of this Section. \nCancellation, downsizing, curtailment, or departure does not extinguish the remaining \nresponsibility. When a final Reconciliation Statement determines that the \nresponsibility has reached zero (“Break-Even”), LS Power Grid shall terminate the \noperational payment and Security obligations and release any excess Security. Once"},{"page":235,"startToken":90644,"endToken":91194,"text":"27 \n \nfinally satisfied, the responsibility shall not revive because of a later change in ROE, \nexpense, load, forecast, or other Formula Rate input, subject only to final true-ups and \ncorrection of errors or fraud for periods before satisfaction. \n6.8. \nTRBAA Credit and No Double Recovery. Supplemental MTRC Receipts, Applied \nSecurity Proceeds other than Applied Security Proceeds applied to a Termination Fee, \nAnnual Termination Fee Credits, and any duplicate-recovery credit under Section \n3.3.3(d) or Section 6.3.5 shall be credited to transmission customers solely through the \nTRBAA and shall not be recorded as revenue credits in, or otherwise included as \ninputs to, the Formula Rate. In each annual TRBAA, LS Power Grid shall include as \nthe Forecast TRBAA Credit: (a) the projected Supplemental MTRC for the following \nRate Year, increased or reduced by any prior-period true-up adjustment invoiced under \nSection 6.5; and (b) for any Covered Upgrade with a Termination Fee Balance, the \nAnnual Termination Fee Credit scheduled under Section 3.3.4 for the following Rate \nYear, prorated as applicable and limited to the available Termination Fee Balance. LS \nPower Grid shall record in the TRBA only Supplemental MTRC cash receipts, \nApplied Security Proceeds other than Applied Security Proceeds applied to a \nTermination Fee, and Annual Termination Fee Credits actually received, applied, or \nscheduled for the applicable Rate Year, respectively. Applied Security Proceeds \napplied to a Termination Fee shall be deposited into and held in the Termination Fee \nAccount under Section 3.3.4 and shall be credited to transmission customers solely \nthrough the applicable Annual Termination Fee Credits. The difference between the \nForecast TRBAA Credit and those actual amounts shall be reflected in the principal \nbalance of the TRBA and flowed through to transmission customers in a subsequent \nTRBAA. A billed but unpaid Supplemental MTRC is not a TRBAA Credit. A later \nSupplemental MTRC Receipt or Applied Security Proceeds, other than Applied \nSecurity Proceeds applied to a Termination Fee, shall be recorded only in the Rate \nYear in which it is received or applied, respectively. Any amount previously recorded \nas a TRBAA Credit that is later refunded, reversed, or otherwise ceases to satisfy the \napplicable obligation shall be reversed in the TRBA when refunded or reversed. \nInterest on the TRBA balance shall be calculated as provided in Section 5.3 of the TO \nTariff. Qualifying Transmission Revenues shall not be included again as a TRBAA \nCredit because they are already reflected in calculating the Supplemental MTRC. \nEach dollar shall be included in a TRBAA Credit only once. Applied Security \nProceeds shall not also be treated as Supplemental MTRC Receipts, and the posting, \ndrawing, holding, replenishment, replacement, or return of Security shall not \nindependently produce a TRBAA Credit. A Forecast TRBAA Credit applies only to \nthe forecast Rate Year and shall be reconciled through the TRBA to actual \nSupplemental MTRC Receipts, Applied Security Proceeds other than those applied to \na Termination Fee, and Annual Termination Fee Credits, as applicable. \nLS Power Grid shall maintain workpapers reconciling each Forecast TRBAA Credit \nand each amount recorded in the TRBA under this Section 6.8 to the applicable \nAnnual MTRC calculation in Schedule 5, forecast and actual Qualifying Transmission \nRevenues, opening unpaid billed balance, Supplemental MTRC invoiced, prior-period \ntrue-up adjustment, Supplemental MTRC cash receipt, Applied Security Proceed,"},{"page":236,"startToken":91194,"endToken":91623,"text":"28 \n \ndirect recovery, closing unpaid billed balance, Termination Fee Balance, Annual \nTermination Fee Credit, resulting forecast-to-actual TRBA difference, Rate Year, \nLarge Load Customer, and Covered Upgrade. LS Power Grid shall include with each \nTRBAA filing workpapers sufficient to permit transmission customers to verify the \nTRBAA Credits reflected in that TRBAA, which may present customer-specific \ninformation on an aggregated basis or be submitted subject to a request for privileged \ntreatment under 18 C.F.R. § 388.112 or other appropriate confidentiality protections. \n6.9. \nProspective Reassignment of Revenue Responsibility.  \n6.9.1. Eligibility for Reassignment of Revenue Responsibility. Whether or not the \nLarge Load Customer remains in service, a portion of the prospective revenue \nresponsibility associated with a Large Load-Driven Upgrade may be reassigned to a \nsubsequent load customer if an objective transmission study conducted under the \napplicable tariff or study process determines that: \n(a) the subsequent large load customer relies upon identifiable incremental \ncapability created by the Large Load-Driven Upgrade; and \n(b) that reliance avoids or reduces identifiable transmission upgrades that \notherwise would have been required to provide the subsequent large load \ncustomer’s requested service. \nIncidental power flows, generalized system benefits, or use of the transmission \nsystem that does not satisfy both requirements shall not support a reassignment. \nThis Section 6.9 applies only to a load customer other than the Large Load \nCustomer, at a facility other than the Large Load Facility. It does not apply to a \ntransfer of ownership or operation of the Large Load Facility, a change in Eligible \nCustomer, or an assignment of this Agreement, which are governed by Sections \n6.10 and 10.1 and do not alter the Applicable Allocation Percentage or the Large \nLoad-Driven Upgrades attributable to the Large Load Facility. \n6.9.2. Reassignment Calculation. LS Power Grid shall determine the prospective \nreassignment separately for each Large Load-Driven Upgrade satisfying Section \n6.9.1 (each, a “Shared Upgrade”). For each Shared Upgrade: \n(a) the Demonstrated Avoided Upgrade Cost shall equal the reasonable \nestimated cost of the transmission upgrades that would have been required \nfor the subsequent large load customer absent the Shared Upgrade, less the \nreasonable estimated cost of any additional transmission upgrades required \nwhen the capability of the Shared Upgrade is considered; \n(b) the Remaining Allocated Net Plant shall equal the portion of the Shared \nUpgrade’s net plant balance included in rate base immediately before the \nreassignment that remains assigned to the Large Load Customer under this \nAgreement; \n(c) the Capability-Supported Amount shall equal the portion of the Remaining \nAllocated Net Plant reasonably attributable to the incremental capability of"},{"page":237,"startToken":91623,"endToken":92012,"text":"29 \n \nthe Shared Upgrade actually relied upon by the subsequent large load \ncustomer; and \n(d) the Reassigned Investment Amount shall equal the least of: \n(i) the Demonstrated Avoided Upgrade Cost; \n(ii) the Capability-Supported Amount; and \n(iii) the Remaining Allocated Net Plant. \nThe Demonstrated Avoided Upgrade Cost, Capability-Supported Amount, and \nRemaining Allocated Net Plant shall be determined using a consistent cost basis and \nprice year. If Remaining Allocated Net Plant is greater than zero, the Reassignment \nPercentage shall equal the Reassigned Investment Amount divided by the \nRemaining Allocated Net Plant, bounded between zero and one hundred percent \n(100%). If Remaining Allocated Net Plant is zero or negative, no Reassignment \nPercentage shall be calculated under this methodology; any reassignment shall \nrequire an applicable tariff methodology or Commission determination addressing \nthat circumstance. \n6.9.3. Prospective Adjustment of Revenue Responsibility. Beginning on the \nReassignment Effective Date, the applicable Annual MTRC assigned to the Large \nLoad Customer shall be prospectively reduced by the Reassignment Percentage \napplied to the Shared Upgrade. LS Power Grid shall record a separate effective \nprospective reassignment credit in the Cumulative Revenue Ledger equal to the \nReassignment Percentage multiplied by the Remaining Cumulative Revenue \nResponsibility associated with the Shared Upgrade that remains assigned to the \nLarge Load Customer immediately before the Reassignment Effective Date. That \ncredit shall be the sole Cumulative Revenue Ledger adjustment for the reassigned \nresponsibility. It shall not adjust the Total Required Revenue Commitment or result \nin a second reduction to the Remaining Cumulative Revenue Responsibility or \nRequired Operational Security for the same reassigned responsibility. \nLS Power Grid shall recalculate the Supplemental MTRC and Operational Security \nunder this Agreement to reflect the reassignment. The Reassignment Effective Date \nshall be the latest of: \n(a) the date the subsequent large load customer commences the service for \nwhich the Shared Upgrade provides the identified incremental capability; \n(b) the effective date of a cost recovery agreement establishing the subsequent \nlarge load customer’s corresponding revenue responsibility; \n(c) the date on which all Security required from the eligible customer serving \nthe subsequent large load customer becomes effective; and \n(d) the date on which the study and any other approvals required under the \napplicable tariff become final. \nNo reduction in the Large Load Customer’s Operational Security shall occur until \nthe corresponding responsibility and required Security have become effective for the \nsubsequent large load customer."},{"page":238,"startToken":92012,"endToken":92471,"text":"30 \n \n6.9.4. Prospective Treatment and Prevention of Duplicate Reassignment. A \nreassignment under this Section shall: \n(a) operate prospectively only and shall not produce a refund, credit, or \nreopening of amounts properly determined for a prior Rate Year; \n(b) transfer prospective revenue responsibility only and shall not constitute a \nsale or transfer of transmission facilities, a transfer of plant ownership, a \nchange in plant accounting, or a modification of any CAISO cost allocation; \n(c) not exceed the prospective responsibility remaining under this Agreement \nfor the Shared Upgrade; and \n(d) not assign the same transmission capability, avoided upgrade cost, Annual \nMTRC, or Cumulative Revenue Responsibility to more than one large load \ncustomer. \nLS Power Grid shall maintain an upgrade-specific reassignment ledger identifying \nthe capability and responsibility assigned to each large load customer. Once \nresponsibility has been effectively reassigned, that responsibility shall not revert to \nthe Large Load Customer if the subsequent large load customer later terminates, \nreduces, or fails to commence service. The reassigned responsibility shall instead \nremain with the subsequent large load customer and the Eligible Customer \nresponsible for its payment, subject to any further prospective reassignment \npermitted under the applicable agreement and tariff. \nAny prospective reassignment, adjustment, or change in the cost share of a CAISO-\nAssigned Regional Project shall be recognized under this Agreement only to the \nextent authorized or required by the CAISO Tariff or a Commission-accepted \nmethodology. LS Power Grid shall apply an effective change prospectively to the \nRegional Project Allocated ARR, Cumulative Revenue Responsibility, \nSupplemental MTRC, TRBAA Credit, and Operational Security, and shall update \nSchedule 4 and the applicable workpapers. The change shall not assign the same \nproject share to more than one customer or alter costs allocated to other customers \nunder the CAISO Tariff. \n6.10. Change in Eligible Customer. Cost responsibility is assigned to the Large Load \nCustomer and Large Load Facility, as paid by the Eligible Customer then taking \nwholesale transmission service on behalf of the Large Load Customer and Large Load \nFacility. If the Eligible Customer serving a Large Load Customer or Large Load \nFacility changes, the Successor Eligible Customer must execute an assumption \nagreement covering the Cumulative Revenue Responsibility and any outstanding \nobligations under Section 6.3.6, provide required Security, and become responsible on \na date coordinated with CAISO billing before the prior Eligible Customer is released. \nFollowing the complete departure of the Large Load Customer, the last responsible \nEligible Customer remains obligated unless responsibility is transferred under an \napplicable tariff or state-law mechanism, assumed by a successor, or prospectively \nreassigned as permitted under this Agreement and the CAISO Requirements. If \nownership or operation of the Large Load Facility is transferred, Eligible Customer \nshall notify LS Power Grid within thirty (30) Calendar Days and shall cause the"},{"page":239,"startToken":92471,"endToken":92930,"text":"31 \n \ntransferee to execute a Limited Acknowledgment in the form attached to this \nAgreement. The transfer shall not alter the Applicable Allocation Percentage, \nCumulative Revenue Responsibility, or Security obligations under this Agreement. \nA sale, lease, or other transfer of the Large Load Facility, or of the Large Load \nCustomer’s interest in such Large Load Facility, is not a reassignment under Section \n6.9 and does not require a study under Section 6.9.1. Cost responsibility shall continue \nto follow the Large Load Facility, the transferee shall execute a Limited \nAcknowledgment substantially in the form included in this Agreement, and Eligible \nCustomer shall remain responsible for its obligations under this Agreement unless they \nare transferred to a Successor Eligible Customer under this Section 6.10. \n6.11. CAISO Data and Settlement Coordination. Eligible Customer shall provide LS \nPower Grid, or authorize and direct its Scheduling Coordinator, Utility Distribution \nCompany, Metering Coordinator, and other applicable entities to provide LS Power \nGrid, with the metering, settlement, billing, resettlement, allocation, and other data \nreasonably necessary to calculate and verify Qualifying Transmission Revenues and \nadminister this Agreement. Eligible Customer shall execute any authorization or data-\nrelease documentation reasonably necessary for LS Power Grid to obtain such \ninformation. \nTo the extent authorized or required by the CAISO Tariff, CAISO may provide or \nmake available relevant settlement, metering, billing, resettlement, and allocation data \nas provided under the CAISO Requirements. Nothing in this Agreement, however, \nimposes an obligation on CAISO or makes CAISO a party to this Agreement. LS \nPower Grid and Eligible Customer shall cooperate with CAISO and other applicable \nentities to establish and maintain the billing identifiers, metering points, data \nexchanges, and authorizations identified in Schedule 2. \nLS Power Grid shall calculate Qualifying Transmission Revenues, the Annual MTRC, \nand the Supplemental MTRC; maintain the Cumulative Revenue Ledger; and serve on \nEligible Customer the Reconciliation Statement, including the Cumulative Revenue \nLedger statement, required by Sections 6.6 and 6.7. \nIf final data are not available when a calculation is required, LS Power Grid may use \nreasonable estimates based on the best information then available, subject to \nreconciliation under Section 6.6 when final or corrected data become available. \n6.12. Information Rights and Confidentiality. Upon reasonable request, LS Power Grid \nshall provide Eligible Customer the workpapers, data, and other information \nreasonably necessary to verify the identification of Large Load-Driven Upgrades and \nCAISO-Assigned Regional Projects and all calculations of each Annual MTRC, \nRegional Project Allocated ARR, Total Required Revenue Commitment, Qualifying \nTransmission Revenues, Supplemental MTRC, Cumulative Revenue Responsibility, \nTRBAA Credits, reassignment, and Security under this Agreement. Any dispute \nconcerning those matters shall be resolved under Article 11. Large Load Customer and \nany Successor Eligible Customer may participate in a dispute under Article 11 to the"},{"page":240,"startToken":92930,"endToken":93350,"text":"32 \n \nextent the dispute affects its obligations under this Agreement or its Limited \nAcknowledgment. Customer-specific information shall be protected under Section \n16.3 of the TO Tariff, the CAISO Tariff, and any applicable confidentiality agreement. \n7. Security and Payment Obligations \n7.1. \nConstruction Security. Before an applicable Large Load-Driven Upgrade reaches its \nUpgrade In-Service Date, Eligible Customer shall maintain Construction Security \nunder the relevant agreement sufficient to secure: \n(a) LS Power Grid’s incurred and irrevocably committed engineering, design, \nprocurement, permitting, construction, testing, and related costs attributable \nto that upgrade; and \n(b) the Pre-In-Service Termination Costs described in Section 3.3.2, including \nproperly accrued AFUDC and applicable cancellation, demobilization, \nequipment removal, disposition, remediation, and restoration costs \n(“Construction Security”).  \nConstruction Security secures, but does not limit, Eligible Customer’s liability for \nthose amounts. Construction Security provided under the relevant Interconnection \nAgreement or an engineering and procurement agreement for the same costs shall \ncount toward, and shall not be duplicated by, the Construction Security required under \nthis Agreement. Construction Security shall remain in effect for each Large Load-\nDriven Upgrade until that upgrade reaches its Upgrade In-Service Date and the \napplicable release or conversion conditions in Section 7.2 are satisfied. \nA Large Load-Driven Upgrade reaching its Upgrade In-Service Date shall not result in \nthe release of Construction Security attributable to another Large Load-Driven \nUpgrade that has not reached its Upgrade In-Service Date. Eligible Customer shall \nreplenish Construction Security within ten (10) Business Days after notice of a \npermitted draw and supporting information if additional secured obligations remain \nand the remaining Construction Security is less than the amount required under this \nSection. \nFor a CAISO-Assigned Regional Project owned by LS Power Grid, any pre-service \npayment, contribution, or security required from Eligible Customer for its formally \nassigned share shall be provided only as required by the CAISO Tariff, an applicable \nInterconnection Agreement, or another Commission-accepted arrangement, and shall \nbe identified in Schedule 4. This Agreement does not independently require pre-\nservice Construction Security solely because CAISO has assigned a share of a regional \nproject to the Large Load Facility. The treatment of costs for a cancelled or abandoned \nregional project shall be governed by Section 6.3.5 and the applicable Commission \norder, CAISO Tariff, and any project-specific abandoned-plant incentive authorized by \nthe Commission. For a project owned by another entity, construction and operational \nsecurity shall be provided under the CAISO Tariff or the arrangement required by \nSection 6.3.6 and Schedule 4; it shall not be treated as LS Power Grid Operational"},{"page":241,"startToken":93350,"endToken":93774,"text":"33 \n \nSecurity unless included in LS Power Grid’s Formula Rate and expressly identified as \nLS Power Grid’s share. \n7.2. \nDelivery of Operational Security. No later than thirty (30) Calendar Days before the \nearliest expected Upgrade In-Service Date identified in Schedule 1 or Regional Project \nIn-Service Date identified in Schedule 4 for a LS Power Grid-owned CAISO-Assigned \nRegional Project, Eligible Customer shall deliver Operational Security calculated \nunder this Article for the Large Load-Driven Upgrades and LS Power Grid-owned \nCAISO-Assigned Regional Project expected to enter service. Operational Security \nmust be fully effective before any applicable Upgrade In-Service Date or Regional \nProject In-Service Date.  \nIf different Large Load-Driven Upgrades or LS Power Grid-owned CAISO-Assigned \nRegional Projects are expected to reach their applicable in-service dates on different \ndates, LS Power Grid shall recalculate the Required Operational Security before each \nsubsequent in-service date to include the additional Cumulative Revenue \nResponsibility attributable to the upgrade or project share entering service. Eligible \nCustomer shall provide any resulting increase no later than fifteen (15) Business Days \nafter receipt of a Security Notice, or by the applicable in-service date if earlier. \nInclusion of pre-service Construction Work in Progress in rate base shall not constitute \nan Upgrade In-Service Date or independently trigger the Operational Security \nrequirement. Construction Security shall remain applicable to each Large Load-Driven \nUpgrade that has not reached its Upgrade In-Service Date. \nNo Construction Security attributable to a Large Load-Driven Upgrade shall be \nreleased or converted unless:  \n(a) the Required Operational Security attributable to that upgrade is effective; \n(b) that upgrade has reached its Upgrade In-Service Date; and \n(c) LS Power Grid has determined that all Pre-In-Service Termination Costs and \nother construction-related obligations attributable to that upgrade have been \npaid or adequately reserved for. \nAny portion of Construction Security retained for unresolved construction costs shall \nbe released after LS Power Grid determines that those costs have been paid or \nadequately reserved for or, if Section 3.3.2 applies, after the Termination Cost \nReconciliation becomes final. Failure to timely deliver Required Operational Security \nis a default permitting LS Power Grid, to the extent authorized by the applicable tariffs \nand agreements, to suspend energization or service, terminate applicable \ninterconnection arrangements, and draw Construction Security for secured obligations.  \n7.3. \nRequired Operational Security. Required Operational Security shall equal one \nhundred percent (100%) of the nominal Remaining Cumulative Revenue \nResponsibility. LS Power Grid shall reduce that amount only by the portion of \nQualifying Retail Security Support identified in a currently effective Retail Security \nCertification. A Retail Security Certification is accepted in reliance on Eligible"},{"page":242,"startToken":93774,"endToken":94269,"text":"34 \n \nCustomer’s representations and does not require LS Power Grid to review the \nunderlying retail-security documents in the ordinary course. If LS Power Grid has a \nreasonable basis to question the certification, or after a payment default, Credit \nReview Event, or Material Adverse Credit Event, LS Power Grid may request \nsupporting information reasonably necessary to verify continued compliance. Any \nresulting deficiency shall be delivered or restored within fifteen (15) Business Days \nafter receipt of a Security Notice, or by the applicable in-service date if earlier. \n7.4. \nAnnual Resizing and Security Notices. LS Power Grid shall recalculate Required \nOperational Security with each Annual Projection, Final MTRC Determination Date, \nrecalculation of a Final Annual MTRC under Section 6.3.1, Reconciliation Statement, \neffective prospective reassignment, replacement or expiration of Qualifying Retail \nSecurity Support, or Credit Review Event. If LS Power Grid reasonably determines \nthat the Required Security Amount exceeds available Security, it may issue a Security \nNotice identifying the required increase or restoration and reasonable supporting detail \nthen available. Eligible Customer shall provide the required increase or restoration \nwithin fifteen (15) Business Days after receipt of the Security Notice, or by the \napplicable in-service date if earlier. A reduction shall be released only after the \nrelevant calculation and reconciliation are final. \n7.5. \nForm of Operational Security. Except to the extent of currently effective Qualifying \nRetail Security Support, Eligible Customer shall provide direct Operational Security in \nthe form of cash, an irrevocable standby Letter of Credit meeting Schedule 3, or any \ncombination of cash and Letter of Credit. LS Power Grid may accept another form of \nSecurity that it determines, in its sole discretion, is acceptable. \nEach Letter of Credit shall have an initial stated term of at least twelve (12) months \nand shall remain continuously effective until released under this Agreement; provided, \nhowever, that a Letter of Credit may have a stated expiration date before its release \ndate if Eligible Customer timely extends or replaces it so that Security in an amount \nnot less than the Required Security Amount remains continuously available to LS \nPower Grid.  \nIf an issuing bank has the right not to renew a Letter of Credit, the Letter of Credit \nshall require the issuing bank to provide LS Power Grid and Eligible Customer at least \nninety (90) Calendar Days’ prior written notice of nonrenewal. Eligible Customer shall \nprovide a conforming extension or replacement Letter of Credit, or additional cash \ncollateral or other Security accepted by LS Power Grid, no later than sixty (60) \nCalendar Days before the applicable expiration date.   \nIf Eligible Customer fails to provide the required extension, replacement, or other \nSecurity by that deadline, LS Power Grid may, before the Letter of Credit expires, \ndraw all or any portion of the then-available amount under the Letter of Credit and \nretain the proceeds as cash collateral, apply the proceeds to secured obligations, or \nboth. Any proceeds retained but not applied shall continue to constitute Security until \nreleased under this Agreement."},{"page":243,"startToken":94269,"endToken":94796,"text":"35 \n \n7.6. \nDraw and Application. LS Power Grid may draw against all or any portion of a \nLetter of Credit, apply cash collateral, or apply another form of Security accepted by \nLS Power Grid to secured obligations upon: (a) an unpaid Supplemental MTRC, true-\nup, Termination Fee, or other amount due after the applicable payment period; (b) \nEligible Customer’s failure to timely deliver, maintain, replace, restore, or increase \nSecurity; (c) cancellation, termination, withdrawal, abandonment, or permanent \ncessation of the Large Load Facility or a material breach of this Agreement; (d) a \nmaterial inaccuracy in a Retail Security Certification or Security instrument; (e) \nEligible Customer: (i) files a voluntary petition in bankruptcy or seeks reorganization, \narrangement, or similar relief under any bankruptcy, insolvency, or debtor-relief law; \n(ii) becomes subject to an involuntary bankruptcy or insolvency proceeding that is not \ndismissed within sixty (60) Calendar Days; (iii) has a receiver, trustee, liquidator, or \ncustodian appointed for it or a substantial portion of its assets, which appointment is \nnot vacated within sixty (60) Calendar Days; (iv) makes a general assignment for the \nbenefit of creditors; or (v) admits in writing its inability to pay debts as they become \ndue; or (f) Eligible Customer fails to extend, replace, or otherwise maintain Security in \nthe amount and within the time required by Section 7.5, including following a notice \nof nonrenewal, issuer rating reduction, or other event affecting the availability of a \nLetter of Credit. \nA draw shall not automatically require replenishment to the amount maintained \nimmediately before the draw. Following any application of drawn proceeds to an \namount due, LS Power Grid shall recalculate the remaining Cumulative Revenue \nResponsibility and the Operational Security then required under this Article. Eligible \nCustomer shall replenish only the amount, if any, by which the remaining Operational \nSecurity is less than the recalculated Required Security Amount, within fifteen (15) \nBusiness Days after receipt of a Security Notice, or by the applicable in-service date if \nearlier. \nProceeds drawn solely to prevent the expiration or nonrenewal of a Letter of Credit, \nand cash collateral not yet applied to an identified payment obligation, shall remain \nrefundable Security and shall continue to constitute Operational Security until applied \nto an amount then due or released under Section 7.9. Such proceeds and cash collateral \nshall be included in determining the amount of remaining Operational Security and \nshall not create an additional replenishment obligation merely because they are held by \nLS Power Grid. \nThe posting, drawing, holding, replacement, or replenishment of Operational Security \nshall not, by itself, satisfy the secured obligation, reduce Cumulative Revenue \nResponsibility, or produce a TRBAA Credit. Drawn proceeds of Operational Security \nshall become Applied Security Proceeds only when LS Power Grid applies them to an \nidentified Supplemental MTRC, prior-period true-up adjustment, Termination Fee, or \nother secured payment obligation arising under Article 6 or Section 3.3.4. Upon \napplication, the proceeds shall reduce that obligation dollar-for-dollar and shall receive \nthe TRBAA treatment required by Section 6.8; provided, however, that Applied \nSecurity Proceeds applied to a Termination Fee shall be administered under Section \n3.3.4 and credited to transmission customer only through the Annual Termination Fee"},{"page":244,"startToken":94796,"endToken":95261,"text":"36 \n \nCredits provided under Section 6.8. Proceeds of Construction Security applied to Pre-\nIn-Service Termination Costs or other construction-related obligations shall be treated \nas provided in Sections 3.3.2 and 3.3.3. \n7.7. \nSecurity Maintenance. Because Required Operational Security is initially one \nhundred percent (100%) of nominal Remaining Cumulative Revenue Responsibility, \nno separate acceleration concept applies. An incorrect, expired, withdrawn, \nunavailable, or materially misleading Retail Security Certification, or the loss of \nenforceable retail-security rights described in it, is a Material Adverse Credit Event. \nEligible Customer shall provide replacement direct Security for any resulting \nuncovered amount within fifteen (15) Business Days after receipt of a Security Notice, \nor by the applicable in-service date if earlier. \n7.8. \nPost-Termination Administration and Cash Collateral. LS Power Grid shall \ncontinue the annual calculations, invoices, and true-ups required under this Agreement \nfollowing termination of service to, or the departure, permanent cessation, or material \nreduction of service by, the Large Load Customer until the Cumulative Revenue \nResponsibility and all other obligations under this Agreement have been finally \nsatisfied, transferred, reassigned, refunded, or otherwise resolved. The Parties intend \nthat cash collateral and proceeds of Security be treated as a deposit or deferred liability \nrather than as a Contribution in Aid of Construction, customer financing of \ntransmission plant, or a reduction to LS Power Grid’s rate base. To the extent \npermitted by applicable Commission accounting and ratemaking requirements and tax \nlaw, LS Power Grid shall record and administer such amounts as the corresponding \nannual costs and payment obligations arise. The treatment described in this Section is \nsubject to the Commission’s Uniform System of Accounts, the Formula Rate, the \nProtocols, applicable Commission orders, and other Applicable Laws and Regulations. \nIf the Commission requires a different accounting or ratemaking treatment, LS Power \nGrid shall implement the required treatment and make corresponding adjustments \nnecessary to prevent duplicate recovery and preserve, to the extent permitted, the \neconomic allocation established by this Agreement. The Parties shall cooperate in \nseeking any necessary Commission authorization or acceptance.  \nNothing in this Agreement guarantees a particular accounting, ratemaking, or tax \nresult. Cash collateral and unapplied Security proceeds shall remain subject to release \nunder Section 7.9, including release to reflect an effective prospective reassignment \nunder Section 6.9. \n7.9. \nRelease of Security. LS Power Grid shall release excess Operational Security only \nafter the applicable Reconciliation Statement becomes final. LS Power Grid shall \nrelease Security attributable to an effective prospective reassignment and shall release \nall remaining Security within thirty (30) Calendar Days after final satisfaction of the \nCumulative Revenue Responsibility and all other secured obligations. Termination \nalone does not require release. \n7.10. Security Does Not Limit Liability. The Required Security Amount is based on LS \nPower Grid’s then-current estimates and calculations and does not cap, replace, or"},{"page":245,"startToken":95261,"endToken":95775,"text":"37 \n \ndischarge Eligible Customer’s underlying obligations. A shortfall between Security \nand the amount due remains immediately payable to LS Power Grid. \n7.11. Events of Default; Remedies. Each of the following is an “Event of Default” by \nEligible Customer: (a) failure to pay any undisputed amount when due that continues \nfor ten (10) Business Days after written notice from LS Power Grid; (b) failure to \ndeliver, maintain, replace, restore, or increase Security when required under this \nArticle 7 or Schedule 3 that continues after the applicable cure period; (c) any other \nmaterial breach of this Agreement, including under Section 4.2 or 6.3.6, that continues \nfor thirty (30) Calendar Days after written notice from LS Power Grid or, if the breach \ncannot reasonably be cured within that period, for such longer period, not to exceed \nninety (90) Calendar Days, as Eligible Customer diligently pursues a cure; and (d) any \nevent described in Section 7.6(e). Upon an Event of Default, LS Power Grid may, \nsubject to Applicable Laws and Regulations and the applicable tariffs and agreements: \n(i) draw and apply Security under Section 7.6; (ii) exercise the rights described in \nSections 4.2.6 and 7.2; (iii) before the first Upgrade In-Service Date or Regional \nProject In-Service Date, terminate this Agreement under Section 3.3.1; and (iv) pursue \nany other remedy available at law or in equity or before the Commission. No \ntermination after an Upgrade In-Service Date or Regional Project In-Service Date \nreleases the obligations described in Section 3.3.4. \n8. Force Majeure. \n8.1. \nIf a Party is rendered unable, wholly or in part, by Force Majeure to carry out a \nnonmonetary obligation, that obligation shall be suspended only to the extent and for \nthe period performance is prevented. Force Majeure does not suspend or excuse \npayment of incurred construction costs, Pre-In-Service Termination Costs, \nSupplemental MTRC, the Termination Fee, prior-period true-up adjustments, or the \nmaintenance, replacement, replenishment, or increase of Security. If a Force Majeure \nevent continues for more than twenty (20) Calendar Days in a sixty (60)-Calendar Day \nperiod, the Parties shall meet to address performance; any resulting termination \nremains subject to Sections 3.4 and 3.5.  \n9. Indemnification  \n9.1. \nIndemnity. Each Party (the “Indemnifying Party”) shall at all times indemnify, \ndefend, and hold the other Party and its Affiliates and their respective directors, \nofficers, employees, and agents (each, an “Indemnified Person”) harmless from any \nand all damages, losses, claims, including claims and actions relating to injury to or \ndeath of any person or damage to property, demand, suits, recoveries, costs and \nexpenses, court costs, attorney fees, and all other obligations by or to third parties, \narising out of or resulting from the Indemnifying Party’s actions or omissions in \nperforming its obligations under this Agreement, except to the extent caused by the \ngross negligence or willful misconduct of the Indemnified Person. \n9.1.1. \nIndemnified Person. If an Indemnified Person is entitled to indemnification as a \nresult of a claim by a third party, and the Indemnifying Party fails, after notice"},{"page":246,"startToken":95775,"endToken":96289,"text":"38 \n \nand reasonable opportunity to proceed, to assume the defense of such claim, such \nIndemnified Person may at the expense of the Indemnifying Party contest, settle \nor consent to the entry of any judgment with respect to, or pay in full, such \nclaim. \n9.1.2. \nIndemnifying Party. If an Indemnifying Party is obligated to indemnify and \nhold any Indemnified Person harmless, the amount owing to the Indemnified \nPerson shall be the amount of such Indemnified Person’s actual loss, net of any \ninsurance or other recovery. \n9.2. \nIndemnity Procedures. Promptly after receipt by an Indemnified Person of any claim \nor notice of the commencement of any action or administrative or legal proceeding or \ninvestigation as to which the indemnity provided for in Section 9.1 may apply, the \nIndemnified Person shall notify the Indemnifying Party of such fact. Any failure of or \ndelay in such notification shall not affect a Party’s indemnification obligation unless \nsuch failure or delay is materially prejudicial to the Indemnifying Party. \nThe Indemnifying Party shall have the right to assume the defense thereof with \ncounsel designated by such Indemnifying Party and reasonably satisfactory to the \nIndemnified Person. If the defendants in any such action include one or more \nIndemnified Persons and the Indemnifying Party and if the Indemnified Person \nreasonably concludes that there may be legal defenses available to it and/or other \nIndemnified Persons which are different from or additional to those available to the \nIndemnifying Party, the Indemnified Person shall have the right to select separate \ncounsel to assert such legal defenses and to otherwise participate in the defense of \nsuch action on its own behalf. In such instances, the Indemnifying Party shall only be \nrequired to pay the fees and expenses of one additional attorney to represent an \nIndemnified Person or Indemnified Persons having such differing or additional legal \ndefenses. \nThe Indemnified Person shall be entitled, at its expense, to participate in any such \naction, suit or proceeding, the defense of which has been assumed by the Indemnifying \nParty. Notwithstanding the foregoing, the Indemnifying Party (i) shall not be entitled \nto assume and control the defense of any such action, suit or proceedings if and to the \nextent that, in the opinion of the Indemnified Person and its counsel, such action, suit \nor proceeding involves the potential imposition of criminal liability on the Indemnified \nPerson, or there exists a conflict or adversity of interest between the Indemnified \nPerson and the Indemnifying Party, in which event the Indemnifying Party shall pay \nthe reasonable expenses of the Indemnified Person, and (ii) shall not settle or consent \nto the entry of any judgment in any action, suit or proceeding without the consent of \nthe Indemnified Person, which shall not be unreasonably withheld, conditioned or \ndelayed. \n9.3. \nConsequential Damages. Except for amounts expressly payable under Articles 3, 4, \n6, and 7, no Party shall be liable under this Agreement for special, indirect, incidental, \nconsequential, or punitive damages, including lost profit or revenue, loss of use, cost \nof capital, or temporary equipment or services, under any theory of liability. Amounts"},{"page":247,"startToken":96289,"endToken":96741,"text":"39 \n \nrequired to satisfy the Cumulative Revenue Responsibility, Supplemental MTRC, \nconstruction costs, prior-period true-up adjustments, and Security obligations are \ndirect contractual payment obligations and are not excluded damages. \n10. Assignment \n10.1. Except for a change in Eligible Customer governed by Section 6.10, a Party may \nassign this Agreement only with the other Party’s written consent; provided that a \nParty may assign to an Affiliate with equal or greater creditworthiness and legal and \noperational capacity to perform. No assignment or change in retail service provider \nreleases the existing Eligible Customer until the assignee or Successor Eligible \nCustomer executes the required assumption, provides required Security, and the \ntransfer becomes effective under the applicable tariffs. Any prohibited assignment is \nvoid, and Security provided by or on behalf of Large Load Customer does not make \nLarge Load Customer the wholesale obligor.  \n11. Disputes \nAll disputes, claims, or controversies arising out of or relating to this Agreement, including \nany dispute concerning the identification or allocation of Large Load-Driven Upgrades or \nCovered Upgrades; any calculation, update, or recalculation of an Estimated Annual MTRC, \nFinal Annual MTRC, Regional Project Allocated ARR, or the MTRC Calculation Template; \nQualifying Transmission Revenues; Supplemental MTRC; Total Required Revenue \nCommitment; Cumulative Revenue Responsibility; TRBAA Credits; Pre-In-Service \nTermination Costs; the Termination Fee; prospective reassignment; or Security, shall be \nresolved under this Article 11, except that a dispute concerning CAISO’s designation of a \nregional project or assignment of a project cost share shall be resolved under the applicable \nCAISO Tariff procedures. Any payment, refund, credit, or other adjustment resulting from the \nresolution of a dispute under this Article 11 shall be implemented as provided in Section 11.5. \n11.1. Submission and Informal Resolution. In the event of a dispute or claim arising out \nof or relating to this Agreement, the disputing Party shall provide the other Party with \na written notice describing the dispute (“Notice of Dispute”). The dispute shall be \nreferred promptly to designated senior representatives for informal resolution. The \nrepresentatives shall meet or confer within ten (10) Business Days and shall use \nreasonable efforts to resolve the matter within thirty (30) Calendar Days after receipt \nof the Notice of Dispute. This informal process is not a condition to seeking \nemergency relief, filing a FERC complaint, or invoking any ADR processes. \n11.2. Alternative Dispute Resolution. If a dispute is not resolved informally, any Party \nmay request Alternative Dispute Resolution (“ADR”). The Parties shall use the ADR \nprocedures, neutral-selection process, confidentiality protections, and timing \nrequirements specified in the applicable FERC rules. ADR shall be conducted by \npersons knowledgeable in electric utility, transmission, and FERC matters and shall \nnot alter a jurisdictional rate, term, or condition unless accepted or approved by the \nFERC."},{"page":248,"startToken":96741,"endToken":97270,"text":"40 \n \n11.3. FERC Complaints and Other Rights. Any Party may instead file a complaint, \npetition, or other pleading with the FERC under Section 206 or Section 306 of the \nFederal Power Act, or seek other relief available under the Federal Power Act or \nApplicable Laws and Regulations, and LS Power Grid may make any filing under \nSection 205 of the Federal Power Act permitted by Section 12.12. No Party’s \nparticipation in informal negotiations or ADR waives or limits its right to seek FERC \naction. A final ADR determination affecting jurisdictional rates, terms, conditions, \ncharges, or Network Upgrades shall be filed with the FERC if required. \n11.4. Costs and Interim Performance. Unless otherwise determined through ADR, the \nParties shall bear their own costs and share neutral costs as specified by the applicable \nADR procedure. During a dispute, each Party shall continue performing undisputed \npayment and operational obligations, and shall pay undisputed amounts when due.  \n11.5. Implementation of Dispute Determinations; TRBAA. Within thirty (30) Calendar \nDays after a dispute under this Article 11 is finally resolved, whether by written \nagreement of the Parties, a final ADR determination (subject to any required \nCommission filing or acceptance), or a final Commission order (each, a “Dispute \nDetermination”), LS Power Grid shall: (a) update the affected MTRC Calculation \nTemplate, Schedules, Cumulative Revenue Ledger, Reconciliation Statement, and \nRequired Operational Security, as applicable, and serve the updated documents on \nEligible Customer; and (b) invoice or refund, as applicable, any amount owed between \nthe Parties as a result of the Dispute Determination, without interest. To the extent a \nDispute Determination changes a TRBAA Credit or any other amount previously \ncredited to, or recovered from, transmission customers, including any change in \nSupplemental MTRC Receipts or Applied Security Proceeds for a prior Rate Year, LS \nPower Grid shall record the resulting difference in the TRBA under Section 6.8 and \nflow it through to transmission customers through the TRBAA, and any amount so \nreturned by LS Power Grid to transmission customers shall include interest as \nprovided in Section 5.3 of the TO Tariff. If a final Commission order in a proceeding \nconcerning LS Power Grid’s TRBAA requires a change to any TRBAA Credit \nattributable to this Agreement, LS Power Grid shall implement that order in the TRBA \nand shall make any corresponding updates and adjustments between the Parties under \nthis Section 11.5 as if the order were a Dispute Determination. Nothing in this Section \nreopens the Final Annual MTRC or Total Required Revenue Commitment except as \nrequired to implement a Dispute Determination or as permitted by Section 6.3.1. \n12. Miscellaneous. \n12.1. Amendment. Except for updates to the MTRC Calculation Template expressly \nauthorized by Section 6.3.1, updates implementing a Dispute Determination under \nSection 11.5, and administrative updates expressly permitted elsewhere in this \nAgreement, this Agreement may be amended only by a written instrument executed by \nthe Parties. An authorized template update shall not change the substantive \nmethodology or other terms of this Agreement. Any material deviation from the \nCommission-accepted pro forma and any unexecuted amendment shall be filed with \nFERC as required by the applicable tariffs and Commission rules."},{"page":249,"startToken":97270,"endToken":97695,"text":"41 \n \n12.2. Entire Agreement. This Agreement, its Schedules, the relevant Interconnection \nAgreement, and other agreements expressly incorporated herein state the Parties’ \ncomplete understanding concerning the wholesale cost recovery mechanism. Nothing \nin this Agreement establishes the retail rates, charges, or security arrangements \nbetween Eligible Customer and Large Load Customer. \n12.3. Governing Tariffs and Order of Precedence. This Agreement shall be interpreted \nand administered consistently with the Federal Power Act, applicable Commission \norders, the CAISO Tariff, and the TO Tariff. The CAISO Tariff, the TO Tariff, and \nany other tariff or agreement within the CAISO Requirements that is on file with or \naccepted by the Commission control over this Agreement and its Schedules to the \nextent of an irreconcilable conflict, with each controlling the matters within its \nrespective scope. Nothing in this Agreement shall require a Party or CAISO to take \naction inconsistent with an applicable Commission-accepted tariff, agreement, or \norder. \nSubject to the preceding paragraph: \n(a) the Formula Rate and Protocols shall control the calculation, information \nexchange, and true-up of LS Power Grid’s Net Revenue Requirement, including \nthe rate base treatment of the Covered Upgrades; Section 5.3 of the TO Tariff \nshall control the flow-through of TRBAA Credits to transmission customers \nthrough the TRBAA; and any dispute concerning a TRBAA Credit, or any other \nmatter arising under this Agreement, shall be resolved under Article 11, and any \nresulting adjustment shall be implemented as provided in Section 11.5. The \nMTRC Calculation Template in Schedule 5, and not the Formula Rate or \nProtocols, shall control calculation of the Estimated Annual MTRC and Final \nAnnual MTRC; \n(b) this Agreement shall control the determination and administration of the \nSupplemental MTRC, Cumulative Revenue Responsibility, Operational Security, \nprospective reassignment, and the other wholesale revenue-support obligations \nestablished herein; \n(c) the applicable Interconnection Agreement shall control the physical \ninterconnection, design, engineering, procurement, construction, testing, \nenergization, and operating requirements, except to the extent this Agreement \nexpressly establishes or supplements construction-cost, pre-service termination-\ncost, revenue-support, or Security obligations; provided that the applicable \ninstruments shall be interpreted, to the extent reasonably possible, to give effect \nto both agreements and prevent duplicate recovery; \n(d) each applicable Affected System Arrangement shall control the design, \nconstruction, ownership, operation, cost responsibility, financial security or \ncredit support, and cost recovery applicable to the corresponding Affected \nSystem Upgrade as between the parties to that arrangement. Nothing in this \nAgreement modifies an Affected System Owner’s tariff, makes LS Power Grid \nresponsible for an obligation of an Affected System Owner, or makes an \nAffected System Owner a Party to this Agreement;"},{"page":250,"startToken":97695,"endToken":98170,"text":"42 \n \n(e) the body of this Agreement shall control over a Schedule in the event of a \nconflict, except where the Schedule identifies a project-specific election, value, \nmethodology, or term that this Agreement expressly authorizes the Parties to \nestablish in the Schedule; and \n(f) the Schedules shall control over other project-specific supporting documents or \nworkpapers that have not been filed with or accepted by the Commission. \nThe Parties shall attempt to interpret the applicable instruments so that each is given \neffect and no provision is rendered superfluous. If an irreconcilable conflict affects a \nCommission-jurisdictional rate, term, or condition, the Parties shall seek any required \nCommission clarification, acceptance, or authorization. Pending resolution, the Parties \nshall continue performing all undisputed obligations. \n12.4. Governing Law. This Agreement shall be interpreted, governed by, and construed \nunder the laws of the State of California, without regard to the principles of conflict of \nlaws thereof, or the laws of the United States, as applicable, as if executed and to be \nperformed wholly within the State of California. \n12.5. Severability. If any term, covenant, or condition of this Agreement or the application \nor effect of any such term, covenant, or condition is held invalid as to any person, \nentity, or circumstance, or is determined to be unjust, unreasonable, unlawful, \nimprudent, or otherwise not in the public interest, by any court or government agency \nof competent jurisdiction, then such term, covenant, or condition shall remain in force \nand effect to the maximum extent permitted by law, and all other terms, covenants, \nand conditions of this Agreement and their application shall not be affected thereby \nbut shall remain in force and effect. The Parties shall be relieved of their obligations \nonly to the extent necessary to eliminate such regulatory or other determination, unless \na court or governmental agency of competent jurisdiction holds that such provisions \nare not severable from all other provisions of this Agreement. \n12.6. No Third Party Beneficiaries. Except for the rights of Large Load Customer and any \nSuccessor Eligible Customer under Section 6.12, this Agreement is not intended to and \ndoes not create rights, remedies, or benefits of any character whatsoever in favor of \nany persons, corporations, associations, or entities other than the Parties, and the \nobligations herein assumed are solely for the use and benefit of the Parties, their \nsuccessors in interest and, where permitted, their assigns. \n12.7. Survival. Expiration or termination of this Agreement shall not affect any right, \nliability, or obligation that accrued before the effective date of expiration or \ntermination or that, by its express terms or nature, is intended to continue thereafter. \nWithout limiting the foregoing, the following shall survive expiration or termination \nfor the period necessary to give them effect: \n(a) all outstanding payment, refund, reimbursement, reconciliation, true-up, Security, \nand release obligations arising under Articles 3, 4, 6, and 7;"},{"page":251,"startToken":98170,"endToken":98613,"text":"43 \n \n(b) the determination and final satisfaction, transfer, or prospective reassignment of \nthe Cumulative Revenue Responsibility; \n(c) the calculation and implementation of TRBAA Credits and other adjustments \nnecessary to prevent duplicate recovery; \n(d) the confidentiality and information-protection obligations applicable under \nSection 6.12, Section 16.3 of the TO Tariff, the CAISO Tariff, and any \napplicable confidentiality agreement; \n(e) the Parties’ rights to obtain, inspect, retain, verify, and challenge books, records, \nmetering data, settlement data, calculations, and supporting workpapers relating \nto periods before expiration or termination; \n(f) the indemnification obligations in Article 9 with respect to acts, omissions, \ncircumstances, or claims arising before expiration or termination; \n(g) the dispute-resolution provisions in Article 11 with respect to any surviving right, \nliability, or obligation; and \n(h) any provision that expressly states that it survives or that must survive to prevent \nduplicate recovery or give effect to the Parties’ rights and obligations. \nSurvival of a provision shall not extend the underlying payment or Security obligation \nbeyond the point at which that obligation has been finally satisfied, transferred, \nreassigned, refunded, or released in accordance with this Agreement. \n12.8. No Waiver. A Party’s delay or failure to exercise any right or remedy under this \nAgreement shall not constitute a waiver of that or any other right or remedy. A waiver \nshall be effective only if stated in a written instrument executed by the Party granting \nthe waiver and shall apply only to the specific matter and circumstances stated therein. \nA waiver on one occasion shall not constitute a continuing waiver or a waiver on any \nother occasion. No course of performance or dealing shall amend this Agreement or \nwaive any Commission-jurisdictional rate, term, or condition. Nothing in this Section \nlimits a Party’s rights under the Federal Power Act or Applicable Laws and \nRegulations. \n12.9. Counterparts and Electronic Signatures. This Agreement, any amendment, and any \nassumption or acknowledgment executed pursuant to it may be executed in \ncounterparts, each of which shall be deemed an original and all of which together shall \nconstitute one instrument. Signatures transmitted electronically, including by portable \ndocument format or an electronic-signature platform, shall have the same force and \neffect as original signatures to the extent permitted by Applicable Laws and \nRegulations. Each Party agrees that it shall not contest the validity or enforceability of \nan instrument solely because it was executed or transmitted electronically. \n12.10. Authority. Each Party represents and warrants that: \n(a) it is duly organized, validly existing, and in good standing under the laws of its \njurisdiction of organization, to the extent such concepts apply; \n(b) it has the requisite power and authority to execute, deliver, and perform this \nAgreement;"},{"page":252,"startToken":98613,"endToken":98931,"text":"44 \n \n(c) the execution, delivery, and performance of this Agreement have been duly \nauthorized by all necessary organizational action; \n(d) the individual executing this Agreement on its behalf is authorized to do so; and \n(e) subject to any required Commission acceptance or other regulatory approval \nexpressly identified in this Agreement, this Agreement constitutes its valid and \nbinding obligation, enforceable in accordance with its terms. \nThe Large Load Customer represents only that the individual executing the Limited \nAcknowledgment is authorized to execute that acknowledgment on its behalf. \nExecution of the Limited Acknowledgment does not make the Large Load Customer a \nParty or expand its obligations beyond those expressly stated in the Limited \nAcknowledgment or in a separate undertaking executed by the Large Load Customer. \n12.11. Notices. All notices, requests, demands, and other communications hereunder (herein \ncollectively called “Notice”) shall be in writing and will be deemed to have been duly \ngiven when (a) personally delivered to the receiving Party’s physical address, (b) sent \nby overnight courier service to the receiving Party’s physical address, or (c) delivered \nvia electronic transmission with a courtesy copy sent by overnight courier service to \nthe receiving Party’s physical address, in each case to the appropriate addresses or \nemail addresses set forth below (or to such other addresses or email addresses as a \nParty may designate by Notice to the other Party); provided that any such deliveries \nreceived after normal business hours in the place of business of the receiving Party \nshall be deemed to be received on the next Business Day: \n \nIf to LS Power Grid: \n \nLS Power Grid California, LLC \nAttn: Asset Manager \n16150 Main Circle Drive, Suite 310 \nChesterfield, Missouri 63017 \nEmail: rhohlt@lspower.com \n \nWith a copy to: \n \nLS Power Grid California, LLC \nAttn: Legal Department \n16150 Main Circle Drive, Suite 310 \nChesterfield, Missouri 63017 \nEmail: legalnotices@lspower.com \n \nIf to Eligible Customer: \n \n[Company name] \n[Contact name] \n[Address] \nEmail: [Insert]"},{"page":253,"startToken":98931,"endToken":99136,"text":"45 \n \nIf to Large Load Customer: \n[Company name] \n[Contact name] \n[Address] \nEmail: [Insert] \n12.12. Reservation of Rights. LS Power Grid shall have the right to make a unilateral filing \nwith the Commission under Section 205 of the Federal Power Act to modify this \nAgreement or the pro forma form of this Agreement, and Eligible Customer shall have \nthe right to make a unilateral filing with the Commission under Section 206 of the \nFederal Power Act to modify this Agreement. Each Party shall have the right to protest \nany such filing and to participate fully in any proceeding before the Commission. The \nstandard of review for any proposed change to this Agreement, whether proposed by a \nParty, a non-party, or the Commission acting on its own motion, shall be the just and \nreasonable standard under Sections 205 and 206 of the Federal Power Act. \n \n13. Project-Specific Schedules \n13.1. Required Schedules. Each executed Agreement shall include the following completed \nschedules, which are incorporated into this Agreement. \nSchedule 1 — Project and Allocation Data; \nSchedule 2 — Qualifying Transmission Revenues Methodology; \nSchedule 3 — Credit and Security Standards; \nSchedule 4 — CAISO Regional Project Allocation and Responsibility; and \nSchedule 5 — MTRC Calculation Template and Cumulative Revenue Ledger \n[Signature page follows.]"},{"page":254,"startToken":99136,"endToken":99276,"text":"46 \n \nIN WITNESS WHEREOF, the Parties have caused this Agreement to be duly executed by their \nduly authorized officers as of the day and year first above written. \n \nLS POWER GRID CALIFORNIA, LLC \nBy: __________________________ \nName: ________________________ \nTitle: _________________________ \nDate: _________________________ \n[ELIGIBLE CUSTOMER] \nBy: __________________________ \nName: ________________________ \nTitle: _________________________ \nDate: _________________________ \n \nLIMITED ACKNOWLEDGMENT OF LARGE LOAD CUSTOMER \nLarge Load Customer acknowledges the assignment of cost responsibility to its facility and \nagrees to provide information and notices, authorize release of metering and settlement data, and \ncooperate in a transition to a Successor Eligible Customer. This acknowledgment does not make \nLarge Load Customer the wholesale obligor, establish a FERC-jurisdictional retail rate, or \nconstitute a guarantee of Eligible Customer’s payment obligations. Any separate guarantee or \ncollateral undertaking by Large Load Customer shall be governed by its own terms and filed \nwith FERC if required. \n[LARGE LOAD CUSTOMER] \nBy: __________________________ \nName: ________________________ \nTitle: _________________________ \nDate: _________________________"},{"page":255,"startToken":99276,"endToken":99414,"text":"Schedule 1 - 1 \n \nSchedule 1 \nProject and Allocation Data \n1. Purpose \nThis Schedule identifies the Large Load Facility, the applicable service request, each Large \nLoad-Driven Upgrade covered by this Agreement, the initial allocation of each Large Load-\nDriven Upgrade, and the applicable construction and operational security information. This \nSchedule is incorporated into and made part of the Agreement. \n2. Large Load Facility and Service Information \nLarge Load Customer \n[●] \nEligible Customer \n[●] \nLarge Load Facility \n[Name and description] \nPhysical Location of Large \nLoad Facility \n[●] \nPoint of Interconnection \n[●] \nMetering Point or Settlement \nIdentifier \n[●] \nRequested Service Level \n[●] MW \nRequested Service Phases \n[Identify the MW and expected commencement date of \neach phase] \nExpected Large Load Service \nCommencement Date \n[●] \nOutside Date \n[●] \nApplicable Study or \nAuthorization \n[Study name, number, version, and date] \nApplicable Interconnection, \nTransmission Service, or Other \nAgreement \n[●] \nCAISO or Other Relevant \nProject Identifier \n[●]"},{"page":256,"startToken":99414,"endToken":99467,"text":"Schedule 1 - 2 \n \n3. Large Load-Driven Upgrade Information \nEach Large Load-Driven Upgrade shall be identified separately. \nUpgrade 1 \nUpgrade Description \n[●] \nApplicable Study or \nAuthorization \n[●] \nOwner and Construction \nResponsibility \n[●] \nInitial Estimated Capital Cost \n$[●] \nExpected Construction \nCommencement Date \n[●] \nExpected Upgrade In-Service \nDate \n[●] \nActual Upgrade In-Service Date [●] \nMTRC Term End Date \n[●] \nShared, Phased, or Dependent \nFacility \n[●]"},{"page":257,"startToken":99467,"endToken":99544,"text":"Schedule 1 - 3 \n \nUpgrade 2 \nUpgrade Description \n[●] \nApplicable Study or \nAuthorization \n[●] \nOwner and Construction \nResponsibility \n[●] \nInitial Estimated Capital Cost \n$[●] \nExpected Construction \nCommencement Date \n[●] \nExpected Upgrade In-Service \nDate \n[●] \nActual Upgrade In-Service Date [●] \nMTRC Term End Date \n[●] \nShared, Phased, or Dependent \nFacility \n[●] \n \nUpgrade 3 \nUpgrade Description \n[●] \nApplicable Study or \nAuthorization \n[●] \nOwner and Construction \nResponsibility \n[●] \nInitial Estimated Capital Cost \n$[●] \nExpected Construction \nCommencement Date \n[●] \nExpected Upgrade In-Service \nDate \n[●] \nActual Upgrade In-Service Date [●] \nMTRC Term End Date \n[●] \nShared, Phased, or Dependent \nFacility \n[●]"},{"page":258,"startToken":99544,"endToken":99693,"text":"Schedule 1 - 4 \n \n4. Initial Allocation and Annual MTRC Information \nFor each Large Load-Driven Upgrade, the Initial Allocation Percentage assigned to the Large \nLoad Customer under this Agreement shall be identified below. The sum of the percentages \nallocated to all Large Load Customers for a Large Load-Driven Upgrade shall not exceed one \nhundred percent (100%). \nUpgrade 1 \nInitial Estimated Annual \nMTRC Attributable to Covered \nUpgrade \n$[●] \nInitial Allocation Percentage \nAssigned to This Large Load \nCustomer \n[●]% \nInitial Estimated Annual \nMTRC Allocated to This Large \nLoad Customer \n$[●] \nAggregate Initial Allocation \nPercentage Assigned to All \nLarge Load Customers \n[●]% \nPercentage Allocated to Other \nSystem Needs or Customers \n[●]% \n \nUpgrade 2 \nInitial Estimated Annual \nMTRC Attributable to Covered \nUpgrade \n$[●] \nInitial Allocation Percentage \nAssigned to This Large Load \nCustomer \n[●]% \nInitial Estimated Annual \nMTRC Allocated to This Large \nLoad Customer \n$[●] \nAggregate Initial Allocation \nPercentage Assigned to All \nLarge Load Customers \n[●]% \nPercentage Allocated to Other \nSystem Needs or Customers \n[●]%"},{"page":259,"startToken":99693,"endToken":99856,"text":"Schedule 1 - 5 \n \nUpgrade 3 \nInitial Estimated Annual \nMTRC Attributable to Covered \nUpgrade \n$[●] \nInitial Allocation Percentage \nAssigned to This Large Load \nCustomer \n[●]% \nInitial Estimated Annual \nMTRC Allocated to This Large \nLoad Customer \n$[●] \nAggregate Initial Allocation \nPercentage Assigned to All \nLarge Load Customers \n[●]% \nPercentage Allocated to Other \nSystem Needs or Customers \n[●]% \n \nAny portion of a Large Load-Driven Upgrade not allocated to a Large Load Customer shall be \nexcluded from the Annual MTRC allocable to any Large Load Customer and shall remain \nsubject to otherwise-applicable CAISO cost allocation and rate recovery requirements. \n5. Allocation Methodology and Capability Basis \nThe Initial Allocation Percentage for each Large Load-Driven Upgrade is supported by the \nfollowing study findings and allocation methodology: \nUpgrade 1 \nCustomers or Projects Studied \nTogether \n[●] \nAllocation Methodology \n[●] \nRequested Service or Electrical \nImpact Used in Allocation \n[●] \nIncremental Capability Created \nby Upgrade, if Quantified \n[●] MW or other applicable measure \nCapability Initially Assigned to \nThis Large Load Customer \n[●] \nExplanation of Any Percentage \nAllocated to Other System \nNeeds or Customers \n[●]"},{"page":260,"startToken":99856,"endToken":100020,"text":"Schedule 1 - 6 \n \nUpgrade 2 \nCustomers or Projects Studied \nTogether \n[●] \nAllocation Methodology \n[●] \nRequested Service or Electrical \nImpact Used in Allocation \n[●] \nIncremental Capability Created \nby Upgrade, if Quantified \n[●] MW or other applicable measure \nCapability Initially Assigned to \nThis Large Load Customer \n[●] \nExplanation of Any Percentage \nAllocated to Other System \nNeeds or Customers \n[●] \n \nUpgrade 3 \nCustomers or Projects Studied \nTogether \n[●] \nAllocation Methodology \n[●] \nRequested Service or Electrical \nImpact Used in Allocation \n[●] \nIncremental Capability Created \nby Upgrade, if Quantified \n[●] MW or other applicable measure \nCapability Initially Assigned to \nThis Large Load Customer \n[●] \nExplanation of Any Percentage \nAllocated to Other System \nNeeds or Customers \n[●] \n \nThe allocation methodology shall account for, as applicable: \n(a) Large Load Customers studied individually, jointly, or in a cluster; \n(b) the extent to which two or more Large Load Customers caused the need for or share a \nLarge Load-Driven Upgrade; \n(c) differing requested service levels, electrical impacts, development phases, and facility \nconfigurations; \n(d) facilities constructed in phases or placed in service on different dates; and"},{"page":261,"startToken":100020,"endToken":100126,"text":"Schedule 1 - 7 \n \n(e) any portion of a facility determined at the outset to serve other system needs or \ncustomers. \n6. Initial Cumulative Revenue Responsibility and Security Information \nUpgrade 1 \nInitial Projected Cumulative \nRevenue Responsibility \n$[●] \nConstruction Security \nAttributable to Upgrade \n$[●] \nDate Operational Security Must \nBecome Effective \n[●] \nInitial Projected Incremental \nOperational Security \nAttributable to Upgrade \n$[●] \n \nUpgrade 2 \nInitial Projected Cumulative \nRevenue Responsibility \n$[●] \nConstruction Security \nAttributable to Upgrade \n$[●] \nDate Operational Security Must \nBecome Effective \n[●] \nInitial Projected Incremental \nOperational Security \nAttributable to Upgrade \n$[●] \nUpgrade 3 \nInitial Projected Cumulative \nRevenue Responsibility \n$[●] \nConstruction Security \nAttributable to Upgrade \n$[●] \nDate Operational Security Must \nBecome Effective \n[●] \nInitial Projected Incremental \nOperational Security \nAttributable to Upgrade \n$[●]"},{"page":262,"startToken":100126,"endToken":100609,"text":"Schedule 1 - 8 \n \n \nThe Initial Projected Cumulative Revenue Responsibility stated above represents the initial \nprojection of the Total Required Revenue Commitment for the applicable Large Load-Driven \nUpgrade, calculated as the Estimated Annual MTRC multiplied by twenty (20) using the MTRC \nCalculation Template in Schedule 5. \nConstruction Security shall remain applicable separately to each Large Load-Driven Upgrade \nuntil that upgrade reaches its Upgrade In-Service Date and the applicable conditions for release \nor conversion under Section 7.2 have been satisfied. \nOperational Security must be fully effective before the applicable Upgrade In-Service Date. If \ndifferent Large Load-Driven Upgrades are expected to reach their Upgrade In-Service Dates on \ndifferent dates, LS Power Grid shall recalculate the required Operational Security before each \nsubsequent Upgrade In-Service Date in accordance with Article 7. \n7. Schedule Qualifications \n7.1 Projected Amounts. The capital costs, Estimated Annual MTRC, projected Total \nRequired Revenue Commitment, Cumulative Revenue Responsibility, and Operational Security \namounts stated in this Schedule are initial projections provided for planning and administration \npurposes. They do not constitute fixed amounts, caps, or guarantees.  \n7.2 Initial and Applicable Allocation Percentages. The Initial Allocation Percentage \nidentified for each Large Load-Driven Upgrade shall remain the initial allocation of that upgrade \nto the Large Load Customer. The Applicable Allocation Percentage shall equal the Initial \nAllocation Percentage, as adjusted prospectively by any reassignment effective under Section 6.9 \nor as otherwise required by a final Commission order or applicable tariff provision. \nA change in capital costs, the Upgrade In-Service Date, Formula Rate inputs, or the annual \nrevenue requirement shall not, by itself, change the Initial Allocation Percentage or Applicable \nAllocation Percentage. Cancellation, abandonment, downsizing, curtailment, permanent \ncessation, or material reduction of service by the Large Load Customer also shall not, by itself, \nreduce either percentage. \n7.3 Allocation Limitation. The aggregate Annual MTRC assigned to all Large Load \nCustomers for a Covered Upgrade shall not exceed one hundred percent (100%) of the Annual \nMTRC for that Covered Upgrade. LS Power Grid shall not allocate the same upgrade cost, \ntransmission capability, or annual revenue requirement to more than one Large Load Customer. \n7.4 Upgrade In-Service Dates and MTRC Term End Dates. Each Expected Upgrade In-\nService Date stated in this Schedule is a planning estimate. LS Power Grid shall provide written \nnotice to Eligible Customer of a material change to an Expected Upgrade In-Service Date. \nWithin five (5) Business Days after a Covered Upgrade achieves its Upgrade In-Service Date, \nLS Power Grid shall provide written notice to Eligible Customer stating the actual Upgrade In-\nService Date and the corresponding MTRC Term End Date. LS Power Grid shall update this \nSchedule and the applicable Cumulative Revenue Ledger to reflect those dates. The actual \nUpgrade In-Service Date shall be determined in accordance with the definition of that term in the \nAgreement. Inclusion of pre-service Construction Work in Progress in rate base does not \nconstitute an Upgrade In-Service Date."},{"page":263,"startToken":100609,"endToken":100979,"text":"Schedule 1 - 9 \n \n7.5 Annual Updates. Changes in the Estimated Annual MTRC, Final Annual MTRC, Total \nRequired Revenue Commitment, Cumulative Revenue Responsibility, Supplemental MTRC, \nQualifying Transmission Revenues, or Operational Security resulting from the MTRC \nCalculation Template in Schedule 5, the Annual Projection, the Annual Update and \nReconciliation Statement, or an effective prospective reassignment under Section 6.9 do not \nrequire an amendment to this Schedule. \n7.6 Prospective Reassignment. LS Power Grid shall maintain the customer-, project-, and \nupgrade-specific ledger required by Sections 6.7 and 6.9. Any prospective reassignment shall be \nreflected in that ledger and in the applicable Annual Projection and Reconciliation Statement. A \nprospective reassignment shall adjust the Applicable Allocation Percentage but shall not revise \nthe Initial Allocation Percentage, produce a historical refund, or reopen a prior Rate Year. \n7.7 Updated Expected Dates. An update to an expected construction commencement date, \nExpected Upgrade In-Service Date, or expected Large Load Service Commencement Date may \nbe made by written notice and does not require an amendment to this Schedule unless the update \nalso changes a material rate, term, condition, facility scope, or allocation established by this \nAgreement. \n8. Supporting Materials \nThe following supporting materials are attached to or incorporated by reference into this \nSchedule: \n1. the applicable final transmission study or studies; \n2. the facilities list and cost estimate supporting each Large Load-Driven Upgrade; \n3. the study-based allocation methodology and calculations; \n4. the initial Annual MTRC and Total Required Revenue Commitment workpapers (per \nSchedule 5); \n5. the initial Cumulative Revenue Responsibility calculation; \n6. the Construction Security calculation; \n7. the initial projected Operational Security calculation; \n8. any applicable project diagrams, metering diagrams, or service-phase schedules; and \n9. each applicable Affected System study, Affected System Arrangement, and evidence of \nrequired financial security or credit support. \n9. Affected System Information \nThe following information shall be completed for each potential or confirmed Affected System. \nEligible Customer shall update the information and provide the documentation required by \nSection 4.2 if an Affected System or Affected System Upgrade is identified or the status of an \nAffected System Arrangement changes. \n1. Affected System Owner: [●] \n2. CAISO Participating TO or External Affected System: [●] \n3. Applicable Study and Project Identifier: [●] \n4. Identified System Impact: [●]"},{"page":264,"startToken":100979,"endToken":101097,"text":"Schedule 1 - 10 \n \n5. Affected System Upgrade: [●] \n6. Estimated Cost: $[●] \n7. Affected System Arrangement: [Agreement name, parties, and date] \n8. Required Construction Financial Security or Credit Support: $[●] \n9. Required Post-In-Service Financial Security or Credit Support: $[●] \n10. Commission Filing or Acceptance Required: [Yes/No; docket and status] \n11. Deadline for Delivery to LS Power Grid: [●] \n12. Current Status: [Pending/Executed/Effective] \n13. If no Affected System or Affected System Upgrade has been identified when this \nSchedule is executed, insert the following certification: \nNo Affected System or Affected System Upgrade has been identified as of [date]. This \nstatement does not limit Eligible Customer’s continuing obligations under Section 4.2 if \nan Affected System or Affected System Upgrade is subsequently identified."},{"page":265,"startToken":101097,"endToken":101392,"text":"Schedule 2 - 1 \n \nSchedule 2 \nQualifying Transmission Revenues Methodology \n1. Purpose and Controlling Principles \nThis Schedule establishes the reproducible methodology for calculating projected and actual \nQualifying Transmission Revenues attributable to the Large Load Facility. It is intended to \nidentify wholesale transmission revenues paid by or on behalf of Eligible Customer that are \nattributable to the Large Load Facility and reduce transmission revenues otherwise collected \nfrom CAISO customers or directly credit LS Power Grid’s Net Revenue Requirement. Such \nrevenues may include applicable TAC revenues and qualifying Wheeling Access Charges or \nother wholesale transmission-access, wheeling, or transmission-service charges under the \nCAISO Tariff or another Commission-accepted arrangement, including charges paid through a \nnon-PTO serving entity. The Supplemental MTRC therefore measures only the remaining \nshortfall below the applicable Annual MTRC. \nQualifying Transmission Revenues shall be counted once in calculating the Supplemental MTRC \nand the Cumulative Revenue Responsibility against the combined Annual MTRC for all Covered \nUpgrades. They shall not also be treated as a TRBAA Credit under Section 6.8 because they \nreduce transmission revenues otherwise collected from CAISO customers. This Schedule does \nnot modify CAISO settlement rules, establish a retail rate, impose any obligation on CAISO, or \nalter any cost allocation established under the CAISO Requirements. \n2. Project and Settlement Identifiers \nThe following information shall be completed for each Large Load Facility and updated \nadministratively when a meter, settlement identifier, Eligible Customer, or other listed item \nchanges. An administrative update that does not alter the Commission-accepted methodology \ndoes not require an amendment to the Agreement unless a filing is otherwise required by \nApplicable Laws and Regulations. \nLarge Load Customer \n[●] \nLarge Load Facility \n[●] \nPhysical location and applicable \nCAISO or out-of-state service \narea \n[●] \nEligible Customer at service \ncommencement \n[●] \nScheduling Coordinator \n[●] \nUtility Distribution Company, \nMetered Subsystem, or non-\nPTO serving entity \n[●]"},{"page":266,"startToken":101392,"endToken":101694,"text":"Schedule 2 - 2 \n \nCAISO resource, settlement, or \nload identifier(s) \n[●] \nRevenue-quality meter \nidentifier(s) and location(s) \n[●] \nMetering point used for this \ncalculation \n[●] \nLarge Load Service \nCommencement Date \n[●] \nApplicable TAC, Wheeling \nAccess Charge, or other CAISO \nTariff charge(s) \n[●] \nPrimary source of settlement \nand metering data \n[●] \n \n3. Data Sources and Responsibilities \n(a) LS Power Grid shall calculate projected and actual Qualifying Transmission Revenues \nusing the best available data from CAISO settlement statements, wheeling, transmission-\naccess, and transmission service invoices, revenue-quality meter data, Eligible Customer \nand non-PTO serving entity billing records, Scheduling Coordinator records, and other \ndata made available under the CAISO Tariff, another Commission-accepted arrangement, \nor authorized by Eligible Customer and Large Load Customer. \n(b) Eligible Customer shall provide, or cause its Scheduling Coordinator, Utility Distribution \nCompany, Metering Coordinator, or other authorized agent to provide, all information \nreasonably necessary to identify and verify withdrawals attributable to the Large Load \nFacility. Eligible Customer shall maintain all authorizations reasonably necessary for \nrelease of that information. \n(c) The Large Load Customer shall provide the information and authorizations required by \nits Limited Acknowledgment, including information needed to distinguish the Large \nLoad Facility from other load behind a common meter or within a common settlement \nidentifier. \n(d) LS Power Grid may use CAISO data made available under the CAISO Requirements or \nthrough the authorizations provided under this Agreement. Nothing in this Schedule \nmakes CAISO a party to the Agreement or independently requires CAISO to calculate, \ninvoice, collect, or administer the Supplemental MTRC. \n(e) If final data are unavailable when a projection, invoice, Annual Update, or Reconciliation \nStatement is due, LS Power Grid may use a reasonable estimate based on the most recent \navailable data, the service forecast, applicable TAC rates, and known settlement \nadjustments. Estimated amounts shall be replaced with actual data in the next practicable \nreconciliation."},{"page":267,"startToken":101694,"endToken":102141,"text":"Schedule 2 - 3 \n \n4. Applicable Withdrawals \nFor each CAISO settlement interval or other reproducible billing interval, Applicable \nWithdrawals shall equal the metered energy withdrawals attributable to the Large Load Facility \nat the metering point identified in Section 2 of this Schedule, expressed in MWh and adjusted as \nfollows: \n(a) Imports, exports, station service, auxiliary load, behind-the-meter generation, storage \ncharging and discharging, and other injections or withdrawals shall be treated \nconsistently with the manner in which they are recognized for the applicable TAC charge \nunder the CAISO Tariff. \n(b) Distribution losses and transmission losses shall be included only to the extent they are \nincluded in the billing determinant for the applicable TAC component. The loss factor or \nmethod shall be identified in the project-specific table in Section 10 of this Schedule. \n(c) If the Large Load Facility shares a meter or settlement identifier with other load, the \nwithdrawals attributable to the Large Load Facility shall be determined from revenue-\nquality submeters or another objective allocation method identified in Section 10 of this \nSchedule. An allocation based solely on estimates may be used temporarily but shall be \nreconciled when reliable data become available. \n(d) Withdrawals shall not be counted for a period before the corresponding Annual MTRC is \nincluded in the Supplemental MTRC calculation under Section 6.4 of the Agreement, \nexcept where necessary to correct a prior-period error or resettlement. \n5. Applicable TAC Revenue \nApplicable TAC Revenue for an interval shall equal Applicable Withdrawals multiplied by the \nCAISO transmission rate or rates actually applicable to those withdrawals for that interval. The \ncalculation shall include only transmission charge components that contribute to recovery of the \nrevenue requirement in which LS Power Grid’s costs are included. It shall exclude retail \ndistribution charges, generation charges, non-transmission surcharges, taxes collected for another \ngovernmental entity, and any other charge that does not contribute to recovery of LS Power \nGrid’s transmission revenue requirement. \nIf CAISO uses a monthly, annual, or other non-interval billing determinant, LS Power Grid shall \nperform the calculation using that same billing period and determinant. If more than one TAC \nrate or component applies, each component shall be calculated separately before applying the LS \nPower Grid Allocation Factor. \n6. LS Power Grid Allocation Factor \nThe LS Power Grid Allocation Factor shall identify the portion of Applicable TAC Revenue \nallocable to LS Power Grid for the relevant period. Unless a different Commission-accepted \nmethod is stated in Section 10 of this Schedule, the factor shall be calculated from the same \nrevenue requirement, billing determinant, allocation percentage, and other inputs used by CAISO \nto include LS Power Grid’s net transmission revenue requirement in the applicable TAC rate. \nFor each applicable rate component and period:"},{"page":268,"startToken":102141,"endToken":102579,"text":"Schedule 2 - 4 \n \nLS Power Grid Allocation Factor = LS Power Grid Net Revenue Requirement included in \nthe applicable TAC component ÷ Total Net Revenue Requirement recovered through that \nTAC component. \nIf LS Power Grid’s revenue requirement is recovered through a project-specific, zonal, or other \ndirect allocation rather than a systemwide factor, the corresponding Commission-accepted \nallocation percentage or rate component shall be used. The supporting workpapers shall identify \nthe source and calculation of each factor. \n7. Calculation of Qualifying Transmission Revenues \nProjected and actual Qualifying Transmission Revenues shall be calculated as follows for each \napplicable interval, month, or billing period and then aggregated for the Rate Year or partial Rate \nYear: \nQualifying Transmission Revenues =  Qualifying TAC Revenue + Qualifying Wheeling and \nOther Wholesale Transmission Revenues ± Applicable Adjustments. \nQualifying TAC Revenue = Σ [(Applicable Withdrawals × Applicable TAC Rate) × LS Power \nGrid Allocation Factor]. Qualifying Wheeling and Other Wholesale Transmission Revenues \nequal Wheeling Access Charges and other wholesale transmission-access, wheeling, or \ntransmission-service charges actually paid by or on behalf of Eligible Customer to CAISO, a \nParticipating TO, or a non-PTO transmission or load-serving entity for deliveries serving the \nLarge Load Facility, but only to the extent those revenues reduce transmission revenues \notherwise collected through TAC or directly credit LS Power Grid’s Net Revenue Requirement. \nApplicable Adjustments shall include only amounts attributable to the Large Load Facility, \nincluding CAISO resettlements, billing corrections, refunds, charge reversals, balancing-account \nadjustments, and other adjustments that change the qualifying transmission revenue. Bad debt or \nuncollectible amounts shall reduce Qualifying Transmission Revenues only to the extent the \ncorresponding revenue is not recovered from another source and is not otherwise included in LS \nPower Grid’s Formula Rate recovery. \n8. Projections, Actuals, Resettlements, and Customer Changes \n(a) The Annual Projection shall use forecast withdrawals, then-effective or forecast TAC \nrates, the most recent LS Power Grid Allocation Factor, and known adjustments. The \nworkpapers shall separately identify each material assumption. \n(b) The Reconciliation Statement shall replace projected values with actual withdrawals, \nrates, factors, and adjustments for the applicable period. CAISO resettlements or other \ncorrections received after a Reconciliation Statement becomes final shall be reflected in \nthe next practicable Reconciliation Statement and Annual Update, subject to Section 6.6 \nof the Agreement, and any dispute concerning them shall be resolved under Article 11 of \nthe Agreement. \n(c) A change in Eligible Customer, Scheduling Coordinator, or retail service provider shall \nnot interrupt the calculation or cause the same withdrawals or revenues to be omitted or \ncounted more than once. Qualifying Transmission Revenues shall remain associated with \nthe Large Load Customer and Large Load Facility, regardless of which Eligible \nCustomer is responsible for payment during the applicable period."},{"page":269,"startToken":102579,"endToken":102831,"text":"Schedule 2 - 5 \n \n(d) If two or more Eligible Customers serve the Large Load Facility during a Rate Year, the \nQualifying Transmission Revenues and corresponding Supplemental MTRC shall be \nassigned between them based on the periods during which each provided service, unless \nthe applicable transition agreement provides another Commission-accepted allocation. \n9. Workpapers, Verification, and Records \nWith each Annual Projection and Reconciliation Statement, LS Power Grid shall provide \nworkpapers sufficient for Eligible Customer to reproduce the calculation, including applicable \nmeter quantities, TAC rates, LS Power Grid Allocation Factors, adjustments, source references, \nand a reconciliation to the corresponding Supplemental MTRC and Cumulative Revenue Ledger. \nCustomer-specific or commercially sensitive information may be provided subject to the \nconfidentiality provisions of Section 16.3 of the TO Tariff, the CAISO Tariff, and any applicable \nconfidentiality agreement. \nLS Power Grid, Eligible Customer, and Large Load Customer shall retain supporting records for \nthe period required by the CAISO Tariff, Commission regulations, and Applicable Laws and \nRegulations, and in all events until completion of any timely initiated review, audit, or dispute \nconcerning the applicable Rate Year. Any dispute concerning the calculation shall be resolved \nunder Article 11 of the Agreement. \n10. Project-Specific Methodology Elections \nApplicable Withdrawals \nmethodology \n[●] \nTreatment of shared meters or \nidentifiers \n[●] \nTreatment of behind-the-meter \ngeneration and storage \n[●] \nApplicable TAC, Wheeling \nAccess Charge, or other CAISO \nTariff rate component(s) \n[●] \nLS Power Grid Allocation \nFactor methodology \n[●] \nLoss factor or loss methodology \n[●] \nTreatment of exports and \nstation service \n[●] \nTreatment of refunds and \nresettlements \n[●] \nTreatment of bad debt or \nuncollectible amounts \n[●]"},{"page":270,"startToken":102831,"endToken":102997,"text":"Schedule 2 - 6 \n \nProjection methodology \n[●] \nData-delivery process and \ntiming \n[●] \nOther Commission-accepted \nproject-specific provision \n[●] \n \nThe methodology shall specify the metering point, applicable local and regional TAC \ncomponents, LS Power Grid allocation factor, applicable Wheeling Access Charges or other \nwholesale transmission access, wheeling, or transmission charges, the identity of any non-PTO \nserving entity collecting the charge, the basis for attributing each charge to the Large Load \nFacility, and evidence that the charge reduces transmission revenues otherwise collected through \nTAC or directly credits LS Power Grid’s Net Revenue Requirement. It also shall specify \ntreatment of losses, refunds, resettlements, bad debt and balancing-account adjustments, \ntreatment of a change in Eligible Customer, the source of billing and meter data, and the \ncalculation and verification of projected and actual revenue. Qualifying Transmission Revenues \ncount toward the annual and cumulative responsibility but are not separately credited against LS \nPower Grid’s transmission revenue requirement because they already reduce transmission \nrevenues otherwise collected from CAISO customers or directly credit LS Power Grid’s Net \nRevenue Requirement."},{"page":271,"startToken":102997,"endToken":103332,"text":"Schedule 3 - 1 \n \n \nSchedule 3 \nCredit and Security Standards \n1. Purpose and Application \nThis Schedule establishes the forms, delivery, maintenance, replacement, draw, application, and \nrelease requirements for all Construction Security and Operational Security required under \nArticle 7. Except for the limited reduction of direct Operational Security provided in Section 3, \nall Security shall be provided directly by Eligible Customer. \n2. Permitted Forms of Security \nEligible Customer may provide Security in the form of cash, a Letter of Credit, or any \ncombination thereof. LS Power Grid may accept another form of Security if it determines, in its \nsole discretion, that the form is acceptable. \nCash collateral shall be delivered in immediately available funds to an account designated by LS \nPower Grid and shall count dollar-for-dollar toward the applicable Required Security Amount \nwhile held by LS Power Grid. \n(a) Construction Security \nEligible Customer shall provide and maintain all Construction Security directly in one or more \nforms permitted under this Section 2. A Retail Security Certification and Qualifying Retail \nSecurity Support shall not constitute, reduce, replace, or satisfy Construction Security or any Pre-\nIn-Service Termination Costs. \n(b) Operational Security \nExcept to the extent reduced under Section 3, Eligible Customer shall provide and maintain \ndirect Operational Security in one or more forms permitted under this Section 2 in an amount \nequal to one hundred percent (100%) of the nominal Remaining Cumulative Revenue \nResponsibility. \n3. Retail Security Certification \nA current Retail Security Certification reduces the direct Operational Security requirement \ndollar-for-dollar by the amount of Qualifying Retail Security Support identified in that \ncertification. It does not reduce Eligible Customer’s underlying obligations, constitute Security \nposted directly with LS Power Grid, or apply to Construction Security or Pre-In-Service \nTermination Costs. \nEach Retail Security Certification must be substantially in the form of Exhibit A contained in \nSchedule 3 of this Agreement. Eligible Customer shall deliver a Retail Security Certification \nbefore first relying on Qualifying Retail Security Support to reduce the direct Operational \nSecurity requirement. The Retail Security Certification shall remain effective unless and until"},{"page":272,"startToken":103332,"endToken":103781,"text":"Schedule 3 - 2 \n \nsuperseded, withdrawn, or deemed ineffective under this Agreement. Eligible Customer shall \ndeliver an updated Retail Security Certification within three (3) Business Days after any \nreduction, draw, expiration, nonrenewal, termination, amendment, loss of enforceable draw or \napplication rights, or other event that could impair the certified support. \nWith each Reconciliation Statement, LS Power Grid may identify the amount of Qualifying \nRetail Security Support then reflected in calculating Required Operational Security. That \nidentification does not require Eligible Customer to deliver a new Retail Security Certification \nunless an event requiring an update has occurred. \nLS Power Grid may rely on the certification without reviewing the underlying retail security \ndocuments in the ordinary course, but may request supporting information after a payment \ndefault, Credit Review Event, Material Adverse Credit Event, or reasonable basis to question the \ncertification. \n4. Letter of Credit Requirements \nIf Eligible Customer provides a Letter of Credit as Security, the Letter of Credit must be \nirrevocable, unconditional, transferable, payable at sight, and permit partial and multiple draws. \nIt must be issued by a major United States commercial bank or United States branch of a major \nforeign commercial bank rated at least A- by S&P, A3 by Moody’s, or A- by Fitch, in each case \nby at least two of those three agencies, and otherwise be in form and substance reasonably \nacceptable to LS Power Grid. \nEach Letter of Credit must have an initial stated term of at least twelve (12) months and provide \nLS Power Grid at least ninety (90) Calendar Days’ prior written notice of nonrenewal. Eligible \nCustomer shall provide a conforming extension, replacement Letter of Credit, cash collateral, or \nother Security accepted by LS Power Grid no later than sixty (60) Calendar Days before the \napplicable expiration date following a notice of nonrenewal, and within fifteen (15) Business \nDays after an issuer rating reduction. \nIf Eligible Customer fails to timely provide the required replacement or substitute Security, LS \nPower Grid may, before the applicable Letter of Credit expires, draw all or any portion of the \nthen-available amount and retain the proceeds as cash collateral, apply the proceeds to secured \nobligations, or both. \n5. Security Notices; Maintenance; and Replenishment \nLS Power Grid may issue a Security Notice whenever it reasonably determines that the Required \nSecurity Amount exceeds available Security, including as a result of a draw, application of cash \ncollateral, change in the Required Security Amount, loss of Qualifying Retail Security Support, \nor other event affecting Security availability. \nEligible Customer shall provide any required increase, restoration, replacement, or other cure \nwithin fifteen (15) Business Days after receipt of the Security Notice, or by the applicable in-\nservice date if earlier. \n6. Draws; Application; and Release"},{"page":273,"startToken":103781,"endToken":103946,"text":"Schedule 3 - 3 \n \nLS Power Grid may draw against a Letter of Credit, apply cash collateral, or apply another \naccepted form of Security as permitted under Article 7. A draw, the holding of proceeds or cash \ncollateral, or replenishment does not by itself satisfy an obligation or reduce Cumulative \nRevenue Responsibility. Proceeds of Operational Security become Applied Security Proceeds \nonly when applied to an identified secured obligation as provided in Section 7.6; proceeds of \nConstruction Security are treated as provided in Sections 3.3.2 and 3.3.3. \nLS Power Grid shall release excess Security after the applicable Reconciliation Statement \nbecomes final. LS Power Grid shall release all remaining Security within thirty (30) Calendar \nDays after final satisfaction of all secured obligations, subject to any specifically identified \nunresolved dispute. \n7. Required Security Amount Not a Limitation \nThe Required Security Amount is based on then-current estimates and calculations and does not \nlimit Eligible Customer’s total liability or responsibility for its obligations under this Agreement."},{"page":274,"startToken":103946,"endToken":104282,"text":"Schedule 3, Exhibit A \nForm of Retail Security Certification \nRetail Security Certification \nTo: LS Power Grid California, LLC \nRe: Large Load Cost Recovery Agreement dated [●] between LS Power Grid California, LLC \nand [Eligible Customer] (the “Agreement”) \nThe undersigned, an authorized officer of [Eligible Customer], certifies on behalf of Eligible \nCustomer, as of the date of this certification, as follows: \n1. The retail Large Load Customer is [name], and the Large Load Facility is [identify facility]. \n2. The retail security arrangement is [identify agreement, security type, provider or issuer, \ninstrument number if applicable, and effective and expiration dates]. \n3. The amount of retail security currently available to Eligible Customer and available for the \nwholesale obligations under the Agreement is $[●]. \n4. Eligible Customer has enforceable draw or application rights, or the benefit of a binding \nundertaking, that permit it to use the retail-security proceeds to satisfy the corresponding \nwholesale obligations under the Agreement. \n5. The certified amount has not been counted for another inconsistent obligation and has not \nbeen reduced, drawn, expired, cancelled, or otherwise impaired except as disclosed here: [●]. \n6. The retail security arrangement has the following renewal, expiration, and notice terms: [●]. \nEligible Customer will deliver an updated Retail Security Certification to LS Power Grid \nwithin three (3) Business Days after any reduction, draw, expiration, nonrenewal, \ntermination, amendment, loss of enforceable draw or application rights, or other event that \ncould impair the certified support. \n7. The statements in this certification are true and complete in all material respects as of the \ndate of this certification. Eligible Customer understands that LS Power Grid is entitled to rely \non this continuing certification without reviewing the underlying retail-security documents in \nthe ordinary course, subject to LS Power Grid’s rights under Article 7 and Schedule 3. No \nannual renewal or recertification is required unless an updated Retail Security Certification is \nrequired under Item 6. \nThis Retail Security Certification is continuing and shall remain effective unless and until \nsuperseded, withdrawn, or deemed ineffective under the Agreement. \nELIGIBLE CUSTOMER \nBy: ________________________________ \nName: ______________________________ \nTitle: _______________________________ \nDate: _______________________________"},{"page":275,"startToken":104282,"endToken":104506,"text":"Schedule 4 - 1 \n \nSchedule 4 \nCAISO Regional Project Allocation and Responsibility \nThis Schedule shall identify each CAISO-Assigned Regional Project associated with the Large \nLoad Facility. If no CAISO-Assigned Regional Project has been identified as of the Effective \nDate, this Schedule shall state “None identified as of [date]” and shall be updated promptly after \nCAISO formally assigns a specific project share to the Large Load Facility. The assigned share, \nownership, expected and actual Regional Project In-Service Date, any Commission-authorized \nabandoned-plant incentive and its applicable order, any pre-service payment or security required \nby the CAISO Tariff or another Commission-accepted arrangement, billing path, applicable \noperational security, and credits or true-ups shall be documented below. The Schedule shall not \nbe read to impose pre-service Construction Security under this Agreement unless separately \nrequired by the applicable tariff or Commission-accepted arrangement. \nRequired project information \nProject-specific entry \nCAISO project name and identification number \n[to be completed] \nProject owner and other responsible entities \n[to be completed] \nCAISO Tariff provision, order, study, or formal \ndetermination establishing the specific assignment \n[to be completed] \nDate the assignment is made and its effective date \n[to be completed] \nLarge Load Facility to which the specific share is \nassigned \n[to be completed] \nAssigned share: percentage, dollar amount, or \nother CAISO-approved measure \n[to be completed] \nAllocation basis and calculation, including any \nshare assigned to other beneficiaries \n[to be completed]"},{"page":276,"startToken":104506,"endToken":104658,"text":"Schedule 4 - 2 \n \nRequired project information \nProject-specific entry \nProject ownership and whether costs are included \nin LS Power Grid’s Formula Rate \n[to be completed] \nExpected and actual project in-service date \n[to be completed] \nEstimated Annual MTRC and, once established, \nFinal Annual MTRC for the project share (the Regional \nProject Allocated ARR), together with the projected Total \nRequired Revenue Commitment, if LS Power Grid-owned \nand included in its Formula Rate \n[to be completed] \nBilling entity, payment method, applicable tariff \nor project-owner arrangement, and invoicing schedule \n[to be completed] \nConstruction and operational security required, \nsecurity provider, amount, effective date, and deadline \n[to be completed] \nTreatment of TAC revenues, direct payments, \ncredits, refunds, and true-ups to prevent duplicate \nrecovery \n[to be completed] \nDeadline for Eligible Customer to provide \nexecuted arrangement or compliance evidence \n[to be completed] \nMethod and timing for any prospective \nassignment change authorized by the CAISO Tariff or \nCommission-accepted methodology \n[to be completed]"},{"page":277,"startToken":104658,"endToken":104807,"text":"Schedule 4 - 3 \n \nRequired project information \nProject-specific entry \nCommission order and status authorizing \nabandoned-plant incentive for the project, including \napplicable project scope and recovery terms \n[to be completed] \nPre-service cancellation or abandonment cost \ntreatment under the CAISO Tariff, Commission order, or \napproved project arrangement; any customer contribution \nor security required and applicable credits \n[to be completed] \nFor a CAISO-Assigned Regional Project owned by another entity, this Schedule records the \nEligible Customer’s separate obligation under the CAISO Tariff or project-owner arrangement. \nThat obligation is not included in any Annual MTRC, Regional Project Allocated ARR, Total \nRequired Revenue Commitment, Cumulative Revenue Responsibility, or TRBAA Credit unless \nthe costs are included in LS Power Grid’s Formula Rate and the specific share is expressly \nidentified as LS Power Grid’s responsibility. Any applicable CAISO Tariff credit or project-\nowner credit shall be applied to prevent recovery of the same assigned share more than once."},{"page":278,"startToken":104807,"endToken":105187,"text":"Schedule 5 - 1 \n \nSchedule 5 \nMTRC Calculation Template and Cumulative Revenue Ledger \nThis Schedule contains the project-specific calculation of each Estimated Annual MTRC and \nFinal Annual MTRC and the Cumulative Revenue Ledger. LS Power Grid shall calculate each \nAnnual MTRC solely under this Schedule. The Final Annual MTRC shall equal the applicable \nfinal incurred capital cost multiplied by the Project-Specific Levelized Fixed Charge Rate \ncalculated in this Schedule. The calculation shall identify the applicable capital-cost input, \npresent-worth tax-depreciation benefits, Formula Rate inputs, fixed expense allocator, applicable \nallocation percentage, Annual MTRC, Total Required Revenue Commitment, Remaining \nCumulative Revenue Responsibility, and supporting inputs.  \nFor purposes of calculating present-worth federal and state income-tax depreciation benefits, the \nSchedule applies a levelized-depreciation rate of five percent (5%) of the applicable capital cost \ninput in each year of the twenty (20)-year MTRC Term. This levelized-depreciation schedule is \nnot a separate annual charge. The Schedule is fixed on the Final MTRC Determination Date \nexcept to correct an error or fraud, to implement an effective prospective reassignment, to \nimplement a final FERC order applicable to the calculation, to implement a Dispute \nDetermination under Section 11.5, or to reflect, prospectively, a change in (i) LS Power Grid’s \nreturn on equity component of its Formula Rate, resulting from a final FERC order accepting or \napproving such change, or (ii) applicable federal or state tax rates or tax law enacted after the \nFinal MTRC Determination Date; provided that, the five percent (5%) annual levelized-\ndepreciation schedule shall remain fixed for the MTRC Term unless a final FERC order requires \notherwise. \nThe following project-specific calculation and ledger shall be completed for each Covered \nUpgrade. LS Power Grid shall include an updated ledger statement in each Reconciliation \nStatement served on Eligible Customer under Sections 6.6 and 6.7; this Schedule does not \nimpose a separate FERC filing requirement. \nAnnual Ledger Service. LS Power Grid shall update the Cumulative Revenue Ledger at least \nannually in connection with its Annual Update and shall include the resulting statement and the \nsupporting workpapers in each Reconciliation Statement served on Eligible Customer. The \nstatement is an agreement-administration record and is not required to be filed with FERC unless \nFERC otherwise requires. Any dispute concerning the statement shall be resolved under Article \n11 of the Agreement."},{"page":279,"startToken":105187,"endToken":105193,"text":"Schedule 5 - 2 \n \nInputs and Security"},{"page":280,"startToken":105193,"endToken":105202,"text":"Schedule 5 - 3 \n \nQualifying Revenue and Cumulative Revenue Ledger"},{"page":281,"startToken":105202,"endToken":105210,"text":"Schedule 5 - 4 \n \nPresent Worth and Annualization Calculation"},{"page":282,"startToken":105210,"endToken":105213,"text":"Schedule 5 - 5"},{"page":283,"startToken":105213,"endToken":105221,"text":"Schedule 5 - 6 \n \nExpense and Capital Structure Inputs"},{"page":284,"startToken":105221,"endToken":105227,"text":"Schedule 5 - 7 \n \nTwenty-Year Depreciation Schedule"},{"page":285,"startToken":105227,"endToken":105230,"text":"Schedule 5 - 8"},{"page":286,"startToken":105230,"endToken":105233,"text":"Schedule 5 - 9"},{"page":287,"startToken":105233,"endToken":105240,"text":"i \n \n \n \nAppendix VI  LARGE LOAD INTERCONNECTION PROCEDURES"},{"page":288,"startToken":105240,"endToken":105539,"text":"ii \n \nTABLE OF CONTENTS  \n \n Page No. \nSection 1.  Objectives and Applicability .................................................................1 \n \n1.1 Objectives……………………………………………………………….1 \n \n \n1.2 Applicability……………………………………………………………. 1 \n \nSection 2. \nDefinitions ...............................................................................................1 \n \n \nSection 3. \nGeneral Provisions Applicable to All Interconnection Requests.....6  \n \n \n \n3.1 Interconnection Requests ......................................................................6 \n \n3.2 Transmission Interconnection Service .................................................6 \n \n3.2.1 \nThe Product .............................................................................6 \n \n3.2.2 \nNo Applicability to Transmission Service.............................7 \n \n \n3.2.3 \nRoles and Responsibilities ......................................................7 \n \n3.3 Comparability ........................................................................................7 \n \n3.4 Base Case Data .......................................................................................8 \n \n3.5 Coordination with Affected Systems ....................................................8 \n \n3.6  Capacity of the Large Load ..................................................................8 \n \n \n3.7  Proposed Service Commencement Date ..............................................9 \n \n \n3.7.1 \nInterconnection Request .........................................................9 \n \n \n3.7.2 \nAfter Start of the Large Load Interconnection Study .........9 \n3.8 Queue Position ...........................................................................................10 \n3.9 Withdrawal .............................................................................................10 \n \n3.10 Withdrawal Penalty ................................................................................11 \n        3.10.1  Calculation of the Withdrawal Penalty.....................................11 \n3.11 Standards for Co-located Inverter Based Generating Facilities ........12 \n \n \nSection 4. Large Load Study Process ........................................................................12 \n \n4.1 Timing for Submitting Interconnection Requests ..............................12 \n \n \n4.2 Processing of Interconnection Request ................................................12 \n \n4.2.1 \nInitiating an Interconnection Request ..................................13 \n \n4.2.1.1 Use of Interconnection Study Deposit ................................13 \n \n \n \n4.3 Validation of Interconnection Request ................................................14 \n \n4.3.1 \nAcknowledgment of Interconnection Request......................14 \n \n4.3.2 \nDeficiencies in Interconnection Request ...............................14 \n \n4.4   Potential Deferral of the Interconnection Studies ................................15 \n4.5 Scoping Meeting .....................................................................................15 \n \n4.6 Interconnection Studies .........................................................................16 \n \n4.6.1 \nLarge Load Interconnection Study .......................................17 \n \n4.6.1.1  Scope of the Large Load Interconnection Study .................17 \n \n4.6.1.2  Timing of the Large Load Interconnection Study Results .18 \n \n4.6.1.3   Large Load Interconnection Study Report Meeting .........19 \n \n4.6.1.4 Increase in the Commercial Readiness Deposit ...................19 \n4.6.1.5  Restudy....................................................................................20 \n4.6.1.6  Modifications ..........................................................................20"},{"page":289,"startToken":105539,"endToken":105752,"text":"iii \n \n4.6.2     Optional Flexible Interim Load Interconnection (FILI) Study and \nAgreement ...............................................................................................21 \n4.6.3     Additional Studies .....................................................................23 \n \n4.6.4     Financing of Participating TO’s Interconnection Facilities and Large \nLoad Network Upgrades .......................................................................24 \n4.7 Interconnection Financial Security ......................................................24 \n \n4.7.1 \nTypes of Interconnection Financial Security ........................24 \n \n \n \nSection 5. \nLarge Load Interconnection Agreement .............................................25 \n \n5.1 Tender.....................................................................................................25 \n5.2   Negotiation ...............................................................................................25 \n \n5.3 Execution and Filing ..............................................................................26 \n5.4   Commencement of Interconnection Activities .....................................27 \n \n \nSection 6. \nConstruction of Participating TO’s Interconnection Facilities \n \n and Large Load Network Upgrades ....................................................27 \n \n6.1 Schedule..................................................................................................27 \n6.2 Construction Sequencing.......................................................................27 \n \n6.2.1 \nGeneral .....................................................................................27 \n \n6.2.2 \nAdvancing Construction of  \nLarge Load Network Upgrades that are Part of an Expansion Plan of the \nParticipating TO ....................................................................................27 \n \n6.3 Special Provisions for Affected Systems ..............................................28 \n \n \nSection 7. \nMiscellaneous..........................................................................................28 \n \n7.1 Confidentiality ........................................................................................28 \n \n7.1.1 \nScope.........................................................................................28 \n \n7.1.2 \nRelease of Confidential Information .....................................29 \n \n7.1.3 \nRights .......................................................................................29 \n \n7.1.4 \nNo Warranties .........................................................................29 \n \n7.1.5 \nStandard of Care .....................................................................30 \n \n7.1.6 \nOrder of Disclosure .................................................................30 \n \n7.1.7 \nRemedies ..................................................................................30 \n \n7.1.8 \nDisclosure to FERC, its Staff, or a State ...............................30 \n \n7.2 Disputes ................................................................................................31 \n7.2.1 \nSubmission ...............................................................................31 \n \n \nAttachment 1 – Interconnection Request Form"},{"page":290,"startToken":105752,"endToken":106162,"text":"1 \n \n \n \n LARGE LOAD INTERCONNECTION PROCEDURES (LLIP) \n \n \nSection 1. \nObjectives and Applicability  \n1.1 Objectives \n \nThe objective of this LLIP is to implement requirements for Large Load interconnections to the \nParticipating TO’s Transmission System pursuant to the TO Tariff.  For purposes of this LLIP, \nthe “Participating TO” is LS Power Grid California, LLC (“LS Power Grid”), and the “TO \nTariff” is the LS Power Grid California, LLC Transmission Owner Tariff.  Because LS Power \nGrid is a Non-Load-Serving Participating TO and has no End-Use Customers, a Large Load \ninterconnecting under this LLIP will not be a retail transmission customer of the Participating \nTO.   \n \n1.2 Applicability  \n \nThe LLIP is applicable to a Large Load Interconnection Customer that is either (1) proposing to \ninterconnect a Large Load to the Participating TO’s Transmission System; (2) seeking to \nincrease the capacity of an existing Large Load processed under the LLIP; or (3) with respect to \nan existing load interconnected to the Participating TO’s Transmission System that was not \nprocessed under the LLIP, seeking an increase of 50 MW or greater.  This LLIP only applies to \ncompleted Interconnection Requests submitted after the effective date of this Appendix VI to the \nTO Tariff.  Consistent with Section 10A of the TO Tariff, all requests for ECLL Interconnection \nshall be directed to the Participating TO.  An Interconnection Request submitted under this LLIP \nshall constitute the ECLL Interconnection Application, and the Interconnection Studies and the \nLarge Load Interconnection Agreement under this LLIP shall constitute the study process and \nthe ECLL Interconnection Agreement, respectively, for purposes of Section 10A of the TO \nTariff.  \n \n \nSection 2. \nDefinitions  \n \nTerms used in this LLIP with initial capitalization shall have the meanings set forth below.  The \nsingular of any definition shall include the plural and the plural shall include the singular.  If a \nterm with initial capitalization used herein is not defined, such term shall have the meanings \nascribed to such term in Section 3 of the TO Tariff.   \n \n \nAffected System shall mean an electric system other than the Participating TO’s \nTransmission System that may be affected by the proposed interconnection.   \n \n \nAffected System Operator shall mean the entity that owns or operates an Affected System, \nand includes an Affected System Owner as defined in any Cost Recovery Agreement.   \n \n \n \n \nApplicable Laws and Regulations shall mean all duly promulgated applicable federal, state \nand local laws, regulations, rules, ordinances, codes, decrees, judgments, directives, or judicial or \nadministrative orders, permits and other duly authorized actions of any Governmental Authority."},{"page":291,"startToken":106162,"endToken":106601,"text":"2 \n \n \n  \nBase Case shall mean data including, but not limited to, base power flow, short circuit and \nstability data bases, underlying load, generation, and transmission facility assumptions, \ncontingency lists, including relevant remedial action schemes, and transmission diagrams used to \nperform the Interconnection Studies.  The Base Case may include Critical Energy Infrastructure \nInformation (as that term is defined by FERC).  The Base Case may include transmission \nfacilities as approved by the Participating TO or ISO, as applicable, Reliability Network \nUpgrades that are included in a signed interconnection agreement, Large Load Network \nUpgrades, Large Loads and any co-located generation, and load forecast. The Base Case may \nalso include generation facilities that (i) are directly interconnected to a Distribution System or \nthe ISO Controlled Grid; (ii) are interconnected to Affected Systems and may have an impact on \nthe Interconnection Request; (iii) have a pending request to interconnect to a Distribution System \nor an Affected System; or (iv) are not interconnected to a Distribution System or the ISO \nControlled Grid, but are subject to the terms and conditions of a fully executed interconnection \nagreement (or its equivalent predecessor agreement) or for which an unexecuted interconnection \nagreement (or its equivalent predecessor agreement) has been requested to be filed with FERC.   \n \n \nBusiness Day shall mean Monday through Friday, excluding Federal Holidays. \n \n \nCalendar Day shall mean any day including Saturday, Sunday or a Federal Holiday.   \n \nCommercial Readiness Deposit shall mean a deposit paid as set forth in LLIP Sections \n4.2.1 and 4.6.1.4. \n \n \nConfidential Information shall mean any confidential, proprietary or trade secret \ninformation of a plan, specification, pattern, procedure, design, device, list, concept, policy or \ncompilation relating to the present or planned business of a Party, which is designated as \nconfidential by the Party supplying the information, whether conveyed orally, electronically, in \nwriting, through inspection, or otherwise. \n \n \nCost Recovery Agreement shall have the meaning set forth in Section 3 of the TO Tariff. \n \n \nDispute Resolution shall mean the applicable procedure for resolution of a dispute between \nthe Parties as described in Section 14 of the TO Tariff, including, as applicable, the ISO ADR \nProcedures.  \n \n \nFlexible Interim Load Interconnection (FILI) Service shall have the meaning set forth in \nSection 3 of the TO Tariff. \n \n \nFILI Study shall mean the study performed by the Participating TO pursuant to LLIP \nSection 4.6.2 to determine the availability of Interim Firm Interconnection Service and FILI \nService. \n \n \nInterconnection Financial Security shall mean any of the financial instruments listed in \nLLIP Section 4.7.1 provided by the Large Load Interconnection Customer to comply with its \nobligations under the LLIP or the Large Load Interconnection Agreement."},{"page":292,"startToken":106601,"endToken":107037,"text":"3 \n \n \n \nInterconnection Request shall mean a request, in the form of Attachment 1 to Appendix VI \nto the TO Tariff, to interconnect a new Large Load, or to increase the capacity of, or make a \nMaterial Modification to the operating characteristics of, an existing Large Load that is \ninterconnected with the Participating TO’s Transmission System. \n \n \nInterconnection Study shall mean any of the following studies: the Large Load \nInterconnection Study, the FILI Study, restudies, and any additional studies performed pursuant \nto LLIP Section 4.6.3. \n \n \nInterconnection Study Deposit shall mean the cash deposit provided to the Participating \nTO under LLIP Section 4.2.1 as a requirement of a valid Interconnection Request to be used to \noffset the cost of the Interconnection Studies. \n \nLarge Load Capacity shall mean the maximum capacity of the Large Load at the Point of \nInterconnection.  \n \nLarge Load Customer shall mean the End-User that owns, operates, or proposes to develop \nthe Large Load and receives, or will receive, retail transmission service from the Large Load \nInterconnection Customer, and shall be the Large Load Customer for purposes of the TO Tariff \nand any Cost Recovery Agreement. \n \nLarge Load Interconnection Agreement shall mean the interconnection agreement \nbetween the Participating TO and the Large Load Interconnection Customer, developed by the \nParticipating TO consistent with the TO Tariff and the results of the Interconnection Studies and \nnegotiated between the Parties pursuant to LLIP Section 5, which sets forth the terms and \nconditions governing the interconnection of the Large Load to the Participating TO’s \nTransmission System, including, without limitation, cost responsibility, payment provisions, cost \nrecovery, and financial security for the Participating TO’s Interconnection Facilities and Large \nLoad Network Upgrades, as it may be amended from time to time. The Large Load \nInterconnection Agreement shall constitute the ECLL Interconnection Agreement for purposes of \nthe TO Tariff, as applicable, and shall be filed with FERC by the Participating TO to the extent \nrequired. For purposes of the TO Tariff, the Participating TO’s Interconnection Facilities and \nLarge Load Network Upgrades identified in the Large Load Interconnection Agreement shall \ntogether constitute the ECLL Interconnection Facilities. \n \nLarge Load Interconnection Customer shall mean an Eligible Customer for Large Load \n(“ECLL”), as defined in Section 3 of the TO Tariff, that proposes to interconnect its facilities \nwith the Participating TO’s Transmission System for the purpose of providing retail transmission \nservice to a Large Load. \n \nLarge Load Interconnection Customer Interconnection Facilities shall mean all facilities \nand equipment owned, controlled, or operated by the Large Load Interconnection Customer or \nthe Large Load Customer up to the Point of Change of Ownership as identified in the Large"},{"page":293,"startToken":107037,"endToken":107497,"text":"4 \n \nLoad Interconnection Agreement, including any modifications, additions or upgrades to such \nfacilities and equipment.   \n \n \nLarge Load Interconnection Procedures (LLIP) shall mean the interconnection \nprocedures applicable to an Interconnection Request set forth in this Appendix VI to the TO \nTariff. \n \nLarge Load Interconnection Study shall mean an engineering study conducted by the \nParticipating TO for a Large Load Interconnection Customer under the LLIP that evaluates the \nimpact of the proposed interconnection on the safety and reliability of Participating TO’s \nTransmission System and, if applicable, an Affected System. The Large Load Interconnection \nStudy will also determine a list of facilities (including Participating TO’s Interconnection \nFacilities and Large Load Network Upgrades), the cost of those facilities, and the time required \nto interconnect the Large Load with the Participating TO’s Transmission System. The scope of \nthe study is defined in LLIP Section 4.6.1.1. \n \nLarge Load Network Upgrades shall mean the additions, modifications, and upgrades to \nthe ISO Controlled Grid at or beyond the Point of Interconnection necessary to serve one or more \nLarge Loads safely and reliably that are identified through the Large Load Interconnection Study \nand submitted to the ISO for concurrence pursuant to Section 25.7 of the ISO Tariff. Large Load \nNetwork Upgrades do not include Participating TO’s Interconnection Facilities. To the extent a \nLarge Load Network Upgrade is owned or to be constructed by the Participating TO and is \nidentified in Schedule 1 to a Cost Recovery Agreement, such Large Load Network Upgrades \nshall constitute Large Load-Driven Upgrades, as defined in that Cost Recovery Agreement.  \n \nLarge Load Study Process Agreement shall mean the agreement, developed and tendered \nby the Participating TO pursuant to LLIP Section 4.5, entered into by the Large Load \nInterconnection Customer and the Participating TO which sets forth the Parties’ agreement to \nperform Interconnection Studies under the LLIP. \n \n \nMaterial Modification shall mean those modifications that have a material impact on the \ncost or timing of any Interconnection Request, or any other valid interconnection request to the \nParticipating TO or the ISO, with an equal or later Queue Position date.  \n \n \n \nParticipating TO’s Interconnection Facilities shall mean all facilities and equipment \nowned, controlled, or operated by the Participating TO from the Point of Change of Ownership \nto the Point of Interconnection as identified in the Large Load Interconnection Agreement, \nincluding any modifications, additions or upgrades to such facilities and equipment.  \nParticipating TO’s Interconnection Facilities are transmission facilities but are not controlled by \nthe ISO.  Participating TO’s Interconnection Facilities are sole use facilities and shall not include \nLarge Load Network Upgrades.  \n \nParticipating TO’s Transmission System shall mean the facilities owned and operated by \nthe Participating TO and that have been placed under the ISO’s Operational Control, which \nfacilities form part of the ISO Controlled Grid."},{"page":294,"startToken":107497,"endToken":107956,"text":"5 \n \nPoint of Change of Ownership shall mean the point, as set forth in the Large Load \nInterconnection Agreement, where the Large Load Interconnection Customer's interconnection \nfacilities connect to the Participating TO’s Interconnection Facilities. \n \n \nPoint of Interconnection shall mean the point, as set forth in the Large Load \nInterconnection Agreement, where the Participating TO’s Interconnection Facilities connect to \nthe Participating TO’s Transmission System.  For purposes of the TO Tariff, the Point of \nInterconnection shall be the Point of Withdrawal for the Large Load. \n \n  \nQueue Position shall mean the order of a valid Interconnection Request, relative to all other \npending valid Interconnection Requests, established pursuant to LLIP Section 3.8. \n \n \nReasonable Efforts shall mean, with respect to an action required to be attempted or taken \nby a Party under the LLIP or the Large Load Interconnection Agreement, efforts that are timely \nand consistent with Good Utility Practice and are otherwise substantially equivalent to those a \nParty would use to protect its own interests. \n \nReport Meeting shall mean the meeting among the Participating TO, the Large Load \nInterconnection Customer, and if applicable, the ISO and other Affected System Operators to \ndiscuss the results of the Interconnection Studies as set forth in the LLIP.  \n \nScoping Meeting shall mean the meeting between representatives of the Large Load \nInterconnection Customer and Participating TO, and if applicable, the ISO, conducted for the \npurpose of discussing alternative interconnection options, to exchange information including any \ntransmission data and earlier study evaluations that would be reasonably expected to impact such \ninterconnection options, to analyze such information, and to determine the potential feasible \nPoints of Interconnection.  \n \nService Commencement Date shall mean the date the Large Load is initially operated in \nparallel with the Participating TO’s Transmission System and transmission interconnection \nservice is provided to the Large Load Interconnection Customer pursuant to the terms of an \nexecuted Large Load Interconnection Agreement. For purposes of any Cost Recovery \nAgreement, the Service Commencement Date shall be the Large Load Service Commencement \nDate specified in Schedule 1 to that agreement.  \n \nSite Control shall have the meaning set forth in Section 3 of the TO Tariff. \n \nSystem Protection Facilities shall mean the equipment, including necessary protection \nsignal communications equipment, that protects (1) the Participating TO’s Transmission System, \nParticipating TO’s Interconnection Facilities, ISO Controlled Grid, and Affected Systems from \nfaults or other electrical disturbances occurring at the Large Load and (2) the Large Load from \nfaults or other electrical system disturbances occurring on the ISO Controlled Grid, Participating \nTO’s Interconnection Facilities, and Affected Systems or on other delivery systems or other \ngenerating systems to which the ISO Controlled Grid is directly connected. \n \nTransmission Interconnection Service shall mean the service provided by the Participating \nTO associated with interconnecting the Large Load to the Participating TO’s Transmission"},{"page":295,"startToken":107956,"endToken":108391,"text":"6 \n \nSystem and enabling the Large Load Interconnection Customer to receive electric energy at the \nPoint of Interconnection, pursuant to the terms of the Large Load Interconnection Agreement and \nthe TO Tariff. \n \nWithdrawal Penalty shall mean the penalty assessed by Participating TO to a Large Load \nInterconnection Customer that chooses to withdraw or is deemed withdrawn from Participating \nTO’s interconnection queue or whose Large Load does not otherwise reach its Service \nCommencement Date. The calculation of the Withdrawal Penalty is set forth in LLIP Section \n3.10.1. \n \nSection 3. \nGeneral Provisions Applicable to All Interconnection Requests \n \n \n3.1 \nInterconnection Requests \nA Large Load Interconnection Customer shall submit to Participating TO an \nInterconnection Request in the form of Attachment 1 to this LLIP for processing \nunder the LLIP.  Consistent with Section 10A.2.1 of the TO Tariff, the Large \nLoad Interconnection Customer shall send a copy of the Interconnection Request \nto the ISO, and the Interconnection Request and all supporting documentation \nshall be submitted electronically to the Participating TO in the manner posted on \nthe Participating TO’s public website.   \n \nAn Interconnection Request for the expansion of capacity of an existing Large \nLoad shall be treated the same as an Interconnection Request for a new Large \nLoad pursuant to this LLIP.  \n \nCo-located generation serving a Large Load that will not export to the ISO \nControlled Grid shall be interconnected in accordance with the generator \ninterconnection rules of the applicable ECLL, as approved by its Local \nRegulatory Authority (including, for a UDC subject to the jurisdiction of the \nCPUC, CPUC Electric Rule 21), consistent with Section 10A.5 of the TO Tariff; \nprovided that, where such co-located generation is included in the Interconnection \nRequest, the Participating TO will evaluate its incremental impacts on the \nParticipating TO’s Transmission System as part of the LLIP study process. Co-\nlocated generation that will export to the ISO Controlled Grid is required to \nsubmit a generator interconnection request to the ISO in accordance with Section \n25.7.6 of the ISO Tariff for evaluation of the proposed generator interconnection \nand the Large Load will be evaluated pursuant to the LLIP.  For a Large Load co-\nlocated with an exporting generating facility, the ISO will be a party to a pro \nforma agreement that bridges the generator’s Large Generator Interconnection \nAgreement with the Large Load Interconnection Agreement, or will negotiate a \nnon-conforming Large Generator Interconnection Agreement, consistent with \nSection 10A.5 of the TO Tariff. \n \n3.2 \nTransmission Interconnection Service \n \n3.2.1 The Product.  Transmission Interconnection Service allows Large Load \nInterconnection Customer to connect the Large Load to the Participating"},{"page":296,"startToken":108391,"endToken":108739,"text":"7 \n \nTO’s Transmission System and be eligible to receive electric energy and \ncapacity from the ISO Controlled Grid. \n \n3.2.2 No Applicability to Transmission Service.  Nothing in this LLIP shall \nconstitute a request for transmission service or confer upon a Large Load \nInterconnection Customer any right to receive transmission service.   \n \n3.2.3 Roles and Responsibilities. \n \n3.2.3.1 Each Interconnection Request will be subject to the direction and \noversight of the Participating TO.  The Participating TO will \nconduct or cause to be performed the required Interconnection \nStudies and any additional studies the Participating TO determines \nto be reasonably necessary.  The analysis of impacts on, and \nupgrades required to, the Participating TO’s Transmission System \nwill be performed by the Participating TO and will be subject to \nreview and concurrence by the ISO.  The Participating TO will \nperform all required studies related to the Participating TO’s \nTransmission System and will coordinate with Affected System \nOperators in accordance with LLIP Section 3.5. \n \n3.2.3.2 The Participating TO will complete or cause to be completed all \nstudies as required within the timelines provided in this LLIP. \n \n \n3.2.3.3 Each Large Load Interconnection Customer shall pay the actual \ncosts of all Interconnection Studies, and any additional studies the \nParticipating TO determines to be reasonably necessary in \nresponse to the Interconnection Request.  The Participating TO \nshall reimburse the ISO for the actual cost of any portion of the \nInterconnection Studies that the ISO performs related to the ISO \nControlled Grid, as applicable.  \n \n \n3.2.3.3.1 The Participating TO shall issue invoices for \nInterconnection Studies that shall include a detailed and \nitemized accounting of the cost of each Interconnection \nStudy.  Whenever the actual cost of performing the \nInterconnection Studies exceeds the Interconnection \nStudy Deposit, the Large Load Interconnection Customer \nshall pay the undisputed difference in accordance with the \nParticipating TO issued invoice within thirty (30) \nCalendar Days.  The Participating TO shall not be \nobligated to continue to have any studies conducted \nunless the Large Load Interconnection Customer has paid \nall undisputed amounts in compliance herewith."},{"page":297,"startToken":108739,"endToken":109169,"text":"8 \n \n3.3 \nComparability \nParticipating TO shall receive, process and analyze all Interconnection Requests \nin a timely manner as set forth in this LLIP.  Participating TO will use the same \nReasonable Efforts in processing and analyzing Interconnection Requests from all \nLarge Load Interconnection Customers, whether the Large Load is owned by \nParticipating TO and its Affiliates or by a third party.   \n \n3.4 \nBase Case Data \nParticipating TO shall provide Base Case data to a Large Load Interconnection \nCustomer upon request subject to confidentiality provisions in LLIP Section 7.1. \nParticipating TO shall provide base power flow, short circuit databases, including \nall underlying assumptions, and contingency list used in the Large Load \nInterconnection Customer’s Interconnection Studies.  Participating TO is \npermitted to require that the Large Load Interconnection Customer sign a \nconfidentiality agreement before the release of commercially sensitive \ninformation or Critical Energy Infrastructure Information in the Base Case data.  \nSuch Base Cases may include all (i) Large Loads, (ii) generation projects, and (iii) \ntransmission projects, including merchant transmission projects that are proposed \nfor the Participating TO’s Transmission System for which a transmission \nexpansion plan has been submitted and approved by the applicable authority. \n \n \n3.5 \nCoordination with Affected Systems \nThe Participating TO will notify the Affected System Operators that are \npotentially affected by a Large Load Interconnection Customer’s Interconnection \nRequest.  The Participating TO will coordinate the conduct of any studies \nrequired to determine the impact of the Interconnection Request on Affected \nSystems with Affected System Operators and, if possible, include those results (if \navailable) in its applicable Interconnection Study within the time frame specified \nin this LLIP.  Participating TO will include such Affected System Operators in all \nmeetings held with Large Load Interconnection Customer as required by this \nLLIP.  Large Load Interconnection Customer will cooperate with Participating \nTO in all matters related to the conduct of studies and the determination of \nmodifications to Affected Systems.  If an Affected System Operator, that has been \ninformed its system is an Affected System refuses to cooperate with the \nParticipating TO with whom interconnection has been requested in all matters \nrelated to the conduct of studies and the determination of whether modifications \nto its Affected System are necessary to avoid adverse impacts, it waives any right \nin any fora that the Participating TO’s provision of service has adversely impacted \nsuch Affected System Operator. \n \n3.6 \nCapacity of the Large Load  \n \nThe Interconnection Request shall be evaluated using the maximum capacity \nrequested by the Large Load Interconnection Customer.  However, if the \nmaximum capacity that the Large Load is capable of receiving is greater than the"},{"page":298,"startToken":109169,"endToken":109614,"text":"9 \n \nmaximum capacity requested by the Large Load Interconnection Customer, the \nLarge Load Interconnection Customer will be required to limit the Large Load \ncapacity to no greater than the amount requested (e.g., through use of a control \nsystem, power relay(s), or other similar device settings or adjustments), and the \nLarge Load Interconnection Customer must obtain the Participating TO’s \nagreement, with such agreement not to be unreasonably withheld, that the manner \nin which the Large Load Interconnection Customer proposes to implement such a \nlimit will not adversely affect the safety and reliability of the Participating TO’s \nTransmission System.  If the Participating TO does not so agree, then the \nInterconnection Request must be withdrawn or revised to specify the maximum \ncapacity that the Large Load is capable of receiving.    Furthermore, nothing in \nthis section shall prevent a Participating TO from considering a capacity higher \nthan the limited capacity, if appropriate, when evaluating system protection \nimpacts. \n \n3.7 \nProposed Service Commencement Date \nThe  proposed Service Commencement Date of the new Large Load or increase in \ncapacity of the existing Large Load shall not exceed seven years from the date the \nInterconnection Request is received by Participating TO for those Interconnection \nRequests studied in accordance with the Large Load Interconnection Procedures, \nunless Large Load Interconnection Customer demonstrates and the Participating \nTO agrees, such agreement not to be unreasonably withheld, that engineering, \npermitting and construction of the new Large Load or increase in capacity of the \nexisting Large Load will take longer than the seven-year period.    \n \n3.7.1 Interconnection Request.  If the proposed Service Commencement Date in \nthe Interconnection Request is more than seven years from the date the \nInterconnection Request is received by the Participating TO, the Large Load \nInterconnection Customer must demonstrate, subject to the Participating TO’s \nagreement, such agreement not to be unreasonably withheld, that the required \nengineering, permitting and construction of the Large Load will take longer than \nthe seven-year period.  \n \n3.7.2 After Start of the Large Load Interconnection Study.  Any request to \nextend the Service Commencement Date after commencement of the Large Load \nInterconnection Study under the LLIP, or following execution of a Large Load \nInterconnection Agreement, shall be subject to the following: \n \n(i) Requested extension does not exceed seven years from Service \nCommencement Date in the original Interconnection Request.  A request \nto extend the Service Commencement Date that does not exceed seven \nyears from the Service Commencement Date in the original \nInterconnection Request is subject to the modification assessment process \nspecified in LLIP Section 4.6.1.6.1.  \n \n(ii) Requested extension exceeds seven years from Service Commencement \nDate in the original Interconnection Request.  A request to extend the"},{"page":299,"startToken":109614,"endToken":110038,"text":"10 \n \nService Commencement Date that exceeds seven years from the Service \nCommencement Date in the original Interconnection Request shall (a) \ndemonstrate, subject to the Participating TO’s agreement, such agreement \nnot to be unreasonably withheld, that engineering, permitting and \nconstruction of the new Large Load or increase in capacity of the existing \nLarge Load will take longer than the seven-year period, and (b) be subject \nto the modification assessment process specified in LLIP Section \n4.6.1.6.1. \n \nAny extension of the Service Commencement Date under this LLIP Section 3.7.2 \nshall not extend the Outside Date under any applicable Cost Recovery Agreement \nunless the parties to that agreement agree in writing to such extension. \n \n3.8   Queue Position \n \n           3.8.1 Assignment of Queue Position. \nParticipating TO shall assign a Queue Position as follows: the Queue \nPosition shall be assigned based upon the date and time of receipt of all \nitems required pursuant to the provisions of LLIP Section 4.2.1.   \n \n3.8.2 Higher Queue Position.  \nA higher Queue Position assigned to an Interconnection Request is one \nthat has been placed “earlier” in the queue in relation to another \nInterconnection Request that is assigned a lower Queue Position.  \n \n \n3.9 \nWithdrawal \nLarge Load Interconnection Customer may withdraw its Interconnection Request \nat any time by written notice of such withdrawal to Participating TO, and the \nParticipating TO will notify the ISO and Affected System Operators, if any, \nwithin three (3) Business Days of receipt of such a notice.  In addition, after \nconfirmation by the Participating TO of a valid Interconnection Request, if the \nLarge Load Interconnection Customer fails to adhere to all requirements of this \nLLIP, except as provided in LLIP Section 7.2 (Disputes), Participating TO shall \ndeem the Interconnection Request to be withdrawn and shall provide written \nnotice to Large Load Interconnection Customer of the deemed withdrawal within \nfive (5) Business Days and an explanation of the reasons for such deemed \nwithdrawal.  Upon receipt of such written notice, Large Load Interconnection \nCustomer shall have five (5) Business Days in which to either (i) respond with \ninformation or action that cures the deficiency, or (ii) support its position that the \ndeemed withdrawal was erroneous and notify the Participating TO of its intent to \npursue Dispute Resolution. \n \nFor an Interconnection Request under the LLIP, withdrawal shall result in the \nremoval of the Interconnection Request from the Interconnection Studies.  If a \nLarge Load Interconnection Customer disputes the withdrawal and removal from \nthe Interconnection Studies and has elected to pursue Dispute Resolution, Large"},{"page":300,"startToken":110038,"endToken":110432,"text":"11 \n \nLoad Interconnection Customer's Interconnection Request will not be considered \nin any ongoing Interconnection Study during the Dispute Resolution process. \n \nIn the event of such withdrawal, Participating TO, subject to the provisions in \nLLIP Section 7.1, as applicable, shall provide, at Large Load Interconnection \nCustomer's request, all information that Participating TO developed for any \ncompleted study conducted up to the date of withdrawal of the Interconnection \nRequest. \n \n3.10 \nWithdrawal Penalty \n \nA Large Load Interconnection Customer with an Interconnection Request being \nprocessed under the LLIP will be subject to a Withdrawal Penalty if it withdraws \nits Interconnection Request or is deemed withdrawn, or the Large Load does not \notherwise achieve its Service Commencement Date, which date may be modified \nif the necessary Participating TO-owned facilities cannot be constructed on a \ntimeline that meets such date, unless: (1) the withdrawal does not have a material \nimpact on the cost or timing of any equal or later queued interconnection request; \n(2) Large Load Interconnection Customer withdraws after receiving Large Load \nInterconnection Customer’s most recent Interconnection Study report and the \nLarge Load Network Upgrade costs assigned to the Interconnection Request \nidentified in that report have increased by more than twenty-five percent (25%) \ncompared to costs identified in Large Load Interconnection Customer’s preceding \nInterconnection Study report; or (3) Large Load Interconnection Customer \nwithdraws after receiving an Interconnection Study report issued after completion \nof the initial Large Load Interconnection Study and the Large Load Network \nUpgrade costs assigned to the Interconnection Request identified in such \nInterconnection Study report have increased by more than one hundred percent \n(100%) compared to costs identified in the initial Large Load Interconnection \nStudy report. \n \n3.10.1 Calculation of the Withdrawal Penalty \n \nIf the Large Load Interconnection Customer withdraws its Interconnection \nRequest or is deemed withdrawn prior to the commencement of the Large \nLoad Interconnection Study, Large Load Interconnection Customer will \nnot be subject to a Withdrawal Penalty.  If Large Load Interconnection \nCustomer withdraws, is deemed withdrawn, or otherwise does not achieve \nits Service Commencement Date at any point after the commencement of \nthe Large Load Interconnection Study, that Large Load Interconnection \nCustomer’s Withdrawal Penalty will be the greater of: (1) the Large Load \nInterconnection Customer’s Interconnection Study Deposit required under \nLLIP Section 4.2.1; or (2) as follows in (a)–(c): \n \n(a) If Large Load Interconnection Customer withdraws or is deemed"},{"page":301,"startToken":110432,"endToken":110804,"text":"12 \n \nwithdrawn during the Large Load Interconnection Study or after \nreceipt of a Large Load Interconnection Study report, Large Load \nInterconnection Customer will be charged two (2) times the actual cost \nof the Large Load Interconnection Study performed for the Large Load \nInterconnection Customer. \n \n(b) If Large Load Interconnection Customer withdraws or is deemed \nwithdrawn after receipt of the draft Large Load Interconnection \nAgreement but before Large Load Interconnection Customer has \nexecuted a Large Load Interconnection Agreement or has requested \nthat its Large Load Interconnection Agreement be filed unexecuted, \nLarge Load Interconnection Customer will be charged ten percent \n(10%) of its estimated Large Load Network Upgrade costs as reflected \nin the most recently completed Interconnection Study.   \n \n(c) If Large Load Interconnection Customer has executed a Large \nLoad Interconnection Agreement or has requested that its Large Load \nInterconnection Agreement be filed unexecuted and subsequently \nwithdraws its Interconnection Request, the Large Load Interconnection \nCustomer’s Withdrawal Penalty will be calculated as set forth in the \nLarge Load Interconnection Agreement.   \n \nThe Commercial Readiness Deposit shall be retained as financial security \nfor the Withdrawal Penalty (if applicable) and, other than as set forth in \nthe Large Load Interconnection Agreement, any security not applied to the \nWithdrawal Penalty will be released to the Large Load Interconnection \nCustomer following withdrawal or the Service Commencement Date.  \nWhere a Cost Recovery Agreement applies, (i) any Commercial Readiness \nDeposit or Interconnection Financial Security provided for the same costs \nshall count toward, and shall not be duplicated by, the Construction \nSecurity required under the Cost Recovery Agreement, and (ii) any \nWithdrawal Penalty paid with respect to a Large Load Network Upgrade \nshall be credited against the Pre-In-Service Termination Costs payable \nunder the Cost Recovery Agreement for that upgrade, so that the \nParticipating TO does not recover the same costs more than once. \n \n3.11 \nStandards for Co-located Inverter Based Generating Facilities \n \nInverters used for the production, and/or later injection from storage, of electricity \nshall meet the inverter certification standards of UL-1741 and UL-1741 \nSupplement B. \n \nSection 4.  Large Load Study Process \n \n4.1 \nTiming For Submitting Interconnection Requests \nA Large Load Interconnection Customer may submit an Interconnection Request \nfor processing under the LLIP at any time during the year. The Participating TO,"},{"page":302,"startToken":110804,"endToken":111205,"text":"13 \n \nin coordination with the ISO, as applicable, will study the Interconnection \nRequest.   \n \n4.2 \nProcessing of Interconnection Request \n \n4.2.1 \nInitiating an Interconnection Request.  To initiate an \nInterconnection Request under the LLIP, Large Load Interconnection \nCustomer must submit all of the following: (i) an Interconnection Study \nDeposit of $250,000; (ii) a completed Interconnection Request in the form \nof Attachment 1 to the LLIP, including preferred Point of Interconnection \nand voltage level, all information required by Section 10A.2.1 of the TO \nTariff (other than any election of interim service, which shall be made in \naccordance with LLIP Section 4.6.2), and all other technical data; (iii) a \nCommercial Readiness Deposit equal to two times the Interconnection \nStudy Deposit described in this LLIP Section 4.2.1 in the form of an \nirrevocable letter of credit, cash, a surety bond, or other form of security \nthat is reasonably acceptable to Participating TO, in accordance with LLIP \nSection 4.7.1. This Commercial Readiness Deposit is refunded to Large \nLoad Interconnection Customer according to LLIP Section 3.10.1; \nhowever, the Participating TO shall be entitled to hold the Commercial \nReadiness Deposit until the Large Load Interconnection Customer’s Large \nLoad achieves its Service Commencement Date; and (iv) demonstration of \nSite Control.   \n \n4.2.1.1 Use of Interconnection Study Deposit.  The Interconnection \nStudy Deposit shall be applied to pay for prudent costs incurred by \nthe Participating TO, the ISO, or third parties at the direction of the \nParticipating TO or ISO, as applicable, to perform and administer \nthe Interconnection Studies.   \n \nIn the event a Large Load Interconnection Customer withdraws its \nInterconnection Request prior to the commencement of the Large \nLoad Interconnection Study, Large Load Interconnection Customer \nmust pay Participating TO the actual costs of processing its \nInterconnection Request. In the event a Large Load \nInterconnection Customer withdraws after commencement of the \nLarge Load Interconnection Study, Participating TO shall charge \nand Large Load Interconnection Customer shall pay the actual \ncosts of the Interconnection Studies.  \n \nAny difference between the Interconnection Study Deposit and the \nactual cost of the Interconnection Studies shall be paid by or \nrefunded to the Large Load Interconnection Customer. Any \ninvoices for Interconnection Studies shall include a detailed and \nitemized accounting of the cost of each Interconnection Study. \nLarge Load Interconnection Customers shall pay any such \nundisputed costs within thirty (30) Calendar Days of receipt of an"},{"page":303,"startToken":111205,"endToken":111628,"text":"14 \n \ninvoice. If Large Load Interconnection Customer fails to pay such \nundisputed costs within the time allotted, its Interconnection \nRequest shall be deemed withdrawn and will be subject to a \nWithdrawal Penalty pursuant to LLIP Section 3.10.1. \n \nThe Participating TO will reimburse the ISO or third parties, as \napplicable, for all work performed on behalf of the withdrawn \nInterconnection Request at the Participating TO’s direction. The \nLarge Load Interconnection Customer must pay all monies due \nbefore it is allowed to obtain any Interconnection Study data or \nresults. \n \n \n4.3 \nValidation of Interconnection Request \n \n4.3.1 Acknowledgment of Interconnection Request.  Participating TO shall \nnotify the Large Load Interconnection Customer within ten (10) Business \nDays of receipt of the Interconnection Request, which notice shall state \nwhether the Interconnection Request is deemed valid.   \n \n4.3.2 Deficiencies in Interconnection Request.  An Interconnection Request \nwill not be considered to be a valid request until all items in LLIP Section \n4.2.1 have been received by Participating TO and deemed valid by the \nParticipating TO.  If an Interconnection Request fails to meet the \nrequirements set forth in LLIP Section 4.2.1, Participating TO shall \ninclude in its notification to the Large Load Interconnection Customer \nunder LLIP Section 4.3.1 the reasons for such failure and that the \nInterconnection Request does not constitute a valid request.  Consistent \nwith Section 10A.2.3 of the TO Tariff, the Participating TO will attempt to \nremedy deficiencies in the Interconnection Request through informal \ncommunications with the Large Load Interconnection Customer, and the \nLarge Load Interconnection Customer shall provide Participating TO the \nadditional requested information needed to constitute a valid request.  \nWhenever the additional requested information is provided by the Large \nLoad Interconnection Customer, the Participating TO shall notify the \nLarge Load Interconnection Customer within five (5) Business Days of \nreceipt of the additional requested information whether the \nInterconnection Request is valid.  If the Interconnection Request continues \nto fail to meet the requirements set forth in LLIP Section 4.2.1, the \nParticipating TO shall include in its notification to the Large Load \nInterconnection Customer the reasons for such failure.  If an \nInterconnection Request has not been deemed valid, the Large Load \nInterconnection Customer must submit all information necessary to meet \nthe requirements of LLIP Section 4.2.1 no later than twenty (20) Business \nDays after the date the original Interconnection Request was submitted, or \nten (10) Business Days after the Participating TO first provided notice that \nthe Interconnection Request was not valid, whichever is later."},{"page":304,"startToken":111628,"endToken":112035,"text":"15 \n \nInterconnection Requests that have not met the requirements of LLIP \nSection 4.2.1 within twenty (20) Business Days after the date the original \nInterconnection Request was submitted or ten (10) Business Days after the \nParticipating TO first provided notice that the Interconnection Request \nwas not valid, whichever is later, will be deemed invalid, will be returned \nto the Large Load Interconnection Customer in accordance with Section \n10A.2.3 of the TO Tariff, and will not be included in the LLIP.  \n \nInterconnection Requests deemed invalid under this LLIP Section 4.3.2 \nare not subject to LLIP Section 3.9.  Large Load Interconnection \nCustomers with invalid Interconnection Requests under this LLIP Section \n4.3.2 may seek relief under LLIP Section 7.2 by so notifying the \nParticipating TO within two (2) Business Days of the notice of invalidity. \n \n4.4     Potential Deferral of the Interconnection Studies \n \n           The Participating TO may defer commencement of the Large Load \nInterconnection Study when it determines, using Good Utility Practice and \nreasonable engineering judgment, that the Interconnection Request cannot be \nstudied meaningfully until other pending study results for higher-queued projects \nare available. \n \n           Within ten (10) Business Days after deeming an Interconnection Request valid \nunder LLIP Section 4.3.1, the Participating TO will notify the Large Load \nInterconnection Customer in writing if it is deferring the start of the \nInterconnection Studies. The notice will include: (i) information regarding the \npending studies; and (ii) the estimated start date of the Large Load \nInterconnection Study.  During the period of deferral, the Participating TO will \nprovide a monthly status update to the Large Load Interconnection Customer. \n \n \n4.5 \nScoping Meeting \nWithin fifteen (15) Business Days after the Participating TO notifies the Large \nLoad Interconnection Customer that the Interconnection Request has been \ndeemed valid as set forth in LLIP Section 4.3.2, the Participating TO shall \nestablish a date agreeable to the Large Load Interconnection Customer, and the \nISO, if applicable, for the Scoping Meeting.   \n \nThe purpose of the Scoping Meeting shall be to discuss reasonable Service \nCommencement Dates and alternative interconnection options, to exchange \ninformation including any transmission data that would reasonably be expected to \nimpact such interconnection options, to analyze such information and to \ndetermine the potential feasible Points of Interconnection and eliminate \nalternatives given resources and available information. The Scoping Meeting shall \nalso include discussion of a deferral of the Interconnection Studies in accordance \nwith LLIP Section 4.4."},{"page":305,"startToken":112035,"endToken":112497,"text":"16 \n \nThe Participating TO will bring to the meeting, as reasonably necessary to \naccomplish its purpose, such already available technical data, including, but not \nlimited to, (i) general facility loadings, (ii) general instability issues, (iii) general \nshort circuit issues, (iv) general voltage issues, and (v) general reliability issues.    \n \nThe Large Load Interconnection Customer will bring to the Scoping Meeting, in \naddition to the technical data form (Appendix A to Attachment 1) submitted with \nits Interconnection Request, any system studies previously performed.  The \nParticipating TO, the ISO, if applicable, and the Large Load Interconnection \nCustomer will also bring to the meeting personnel and other resources as may be \nreasonably required to accomplish the purpose of the meeting in the time \nallocated for the meeting.  On the basis of the meeting, the Large Load \nInterconnection Customer shall designate its Point of Interconnection.  The \nduration of the meeting shall be sufficient to accomplish its purpose. \n \nWithin five (5) Business Days after the Scoping Meeting, the Participating TO  \nshall tender to the Large Load Interconnection Customer a Large Load Study \nProcess Agreement developed by the Participating TO consistent with the TO \nTariff and this LLIP, which shall contain an outline of the scope of the Large \nLoad Interconnection Study, contain a non-binding good faith estimate of the cost \nto perform such study, and shall specify that the Large Load Interconnection \nCustomer is responsible for the actual cost of the Interconnection Studies, \nincluding reasonable administrative costs.  No later than thirty (30) Calendar Days \nafter the Scoping Meeting, the Large Load Interconnection Customer shall either \nexecute and deliver to the Participating TO  the Large Load Study Process \nAgreement or request that the Participating TO file it unexecuted with FERC, or \nthe Interconnection Request shall be deemed withdrawn.  If an unexecuted filing \nis requested, the Interconnection Studies will be paused until the Large Load \nStudy Process Agreement is made effective by FERC. \n \n4.6 \nInterconnection Studies \nThe Interconnection Studies shall consist of a Large Load Interconnection Study, \nany FILI Study requested pursuant to LLIP Section 4.6.2, and any additional \nstudies, including but not limited to those identified in LLIP Section 4.6.3 \nrequired for interconnection of the Large Load, and co-located generation not \nexporting to the ISO Controlled Grid, to the Participating TO’s Transmission \nSystem.    The analysis of impacts on, and upgrades required to, the Participating \nTO’s Transmission System will be performed by the Participating TO and will be \nsubject to the review and concurrence of the ISO in accordance with Section 25.7 \nof the ISO Tariff. The Interconnection Studies will identify Participating TO’s \nInterconnection Facilities and required Large Load Network Upgrades necessary \nto mitigate thermal overloads and voltage violations, and address short circuit, \nstability, and reliability issues associated with the requested Transmission \nInterconnection Service."},{"page":306,"startToken":112497,"endToken":112870,"text":"17 \n \nAll cost estimates for Participating TO’s Interconnection Facilities and Large \nLoad Network Upgrades, as applicable, contained in the Interconnection Studies \nwill be set forth in the Interconnection Study report in present dollar costs as well \nas time-adjusted dollar costs, adjusted to the estimated year of construction of the \ncomponents being constructed.   \n \nThe Participating TO will prepare an Interconnection Study report to document \nthe results of the Interconnection Studies.   \n \n4.6.1 Large Load Interconnection Study.  \n \n \n4.6.1.1  Scope of the Large Load Interconnection Study.  The Large \nLoad Interconnection Study will consist of a  short circuit analysis, \na power flow analysis, an electromagnetic transient (“EMT”) \nscreening, a non-binding good faith estimate of the scope and cost \nof the Participating TO’s Interconnection Facilities and Large Load \nNetwork Upgrades, and any other studies that are deemed \nnecessary. The Large Load Interconnection Study will also identify \nthe need for any additional studies (e.g., stability analysis, EMT \nstudy, etc.) to be performed as part of the scope of work set forth in \nthe Large Load Interconnection Agreement pursuant to LLIP \nSection 4.6.3.  When there is co-located generation not exporting \nto the ISO Controlled Grid and not subject to electrical short \ncircuit duty dependence, the Large Load Interconnection Study \nwill identify the impacts associated with the Large Load and any \nincremental impacts of the co-located generation.       \nThe Large Load Interconnection Study will consider the use of \nalternative transmission technologies including dynamic line \nratings, advanced power flow control devices, advanced \nconductors, and transmission switching, when evaluating \ntransmission solutions to accommodate new Large Loads and their \nassociated transmission system impacts.  If traditional network \nupgrades are selected instead of alternative transmission \ntechnologies, the Participating TO will provide a demonstration of \nwhy alternative transmission technologies are not feasible or would \nnot result in lower costs or a faster timeline for accommodating the \ninterconnection of the Large Load.  \nThe Large Load Interconnection Study shall state the assumptions \nupon which it is based, state the results of the analyses, and \nprovide the requirement or potential impediments to providing the \nrequested Transmission Interconnection Service, including an \nestimate of the cost and length of time that would be necessary to \ncorrect any problems identified in those analyses and implement \nthe Interconnection."},{"page":307,"startToken":112870,"endToken":113238,"text":"18 \n \nThe Large Load Interconnection Study shall provide a list of \nParticipating TO’s Interconnection Facilities and Large Load \nNetwork Upgrades, as applicable, that are required as a result of \nthe Interconnection Request. \n \n4.6.1.2 Timing of the Large Load Interconnection Study Results.  The \nParticipating TO shall use Reasonable Efforts to complete the \nLarge Load Interconnection Study within ninety (90) Calendar \nDays after the execution of a Large Load Study Process Agreement \nor, if the Large Load Study Process Agreement is filed unexecuted, \nafter it is made effective by FERC.  The Participating TO will \nissue a Large Load Interconnection Study report to the Large Load \nInterconnection Customer. The Participating TO will share study \nresults with the ISO for review and concurrence.   \n \nAt any time the Participating TO determines that it will not meet \nthe required time frame for completing the Large Load \nInterconnection  Study, Participating TO shall notify the Large \nLoad Interconnection Customer as to the schedule status of the \nLarge Load Interconnection Study and provide an estimated \ncompletion date with an explanation of the reasons why additional \ntime is required. \n \nUpon request, the Participating TO shall provide the Large Load \nInterconnection Customer all supporting documentation, \nworkpapers and relevant pre-Interconnection Request and post-\nInterconnection Request power flow and short circuit databases for \nthe Large Load Interconnection Study, subject to confidentiality \narrangements consistent with LLIP Section 7.1. \n \nShould the Large Load Interconnection Customer provide written \ncomments on the Large Load Interconnection Study report at least \nfive (5) Business Days before the Report Meeting conducted to \ndiscuss the report, the Participating TO will address the written \ncomments in the Large Load Interconnection Study Report \nMeeting.  Should the Large Load Interconnection Customer \nprovide comments at any later time (up to the time of the Report \nMeeting), then such comments shall be considered informal \ninquiries to which the Participating TO will provide informal, \ninformational responses at the Report Meeting, to the extent \npossible.  \n \nThe Large Load Interconnection Customer may submit, in writing, \nadditional comments on the final Large Load Interconnection \nStudy report up to three (3) Business Days following the Report \nMeeting.  Based on any discussion at the Report Meeting and any \ncomments received from the Large Load Interconnection Customer"},{"page":308,"startToken":113238,"endToken":113580,"text":"19 \n \nor the ISO, the Participating TO will determine whether it is \nnecessary to follow the Large Load Interconnection Study report \nwith a revised study report.  The Participating TO will issue any \nsuch revised report to the Large Load Interconnection Customer no \nlater than fifteen (15) Business Days following the Report \nMeeting. If the ISO has not completed its review of the Large Load \nInterconnection Study report, the Participating TO shall delay its \ndetermination of whether a revised study report is required until \nthat review is complete. \n \n \n \n \n \n \n4.6.1.3 Large Load Interconnection Study Report Meeting.  A Report \nMeeting shall be held among the Participating TO, the ISO, if \napplicable, and the Large Load Interconnection Customer to \ndiscuss the results of the Large Load Interconnection Study, \nincluding assigned cost responsibility.  Any such Report Meeting \nwill be held within ten (10) Business Days of the date the Large \nLoad Interconnection Study report is provided to the Large Load \nInterconnection Customer.  \n \n4.6.1.4 Commercial Readiness Deposit.  Within thirty (30) Calendar \nDays after receiving the final Large Load Interconnection Study \nreport, the Large Load Interconnection Customer shall provide an \nadditional Commercial Readiness Deposit sufficient to bring the \naggregate Commercial Readiness Deposit to twenty percent (20%) \nof the Participating TO’s then-current estimated construction cost \nof the Large Load Network Upgrades identified in that report that \nare attributable to the Interconnection Request.  If the final Large \nLoad Interconnection Study report is revised following ISO \nreview, the required Commercial Readiness Deposit shall be \nadjusted to reflect twenty percent (20%) of the corresponding \nestimated construction cost identified in the revised final report, \nand any required increase shall be provided within thirty (30) \nCalendar Days after issuance of that report.  \n \n \nThe Commercial Readiness Deposit secures the Withdrawal \nPenalty and other pre-in-service obligations under this LLIP and \nthe Large Load Interconnection Agreement. It does not establish a \ndirect assignment of the Large Load Network Upgrade costs, \nconstitute a payment toward an Annual MTRC, reduce the Total \nRequired Revenue Commitment, or satisfy Operational Security \nunder a Cost Recovery Agreement."},{"page":309,"startToken":113580,"endToken":113966,"text":"20 \n \nTo the extent a Commercial Readiness Deposit is in a form \npermitted under Schedule 3 of an applicable Cost Recovery \nAgreement, LS Power Grid may elect in writing to credit it dollar-\nfor-dollar toward required Construction Security under that \nagreement. No amount of Commercial Readiness Deposit may be \napplied or credited more than once. Any portion not so credited \nshall be administered and released under Sections 3.9 and 3.10 of \nthis LLIP and the Large Load Interconnection Agreement. \n   \n4.6.1.5 Restudy. If restudy of the Large Load Interconnection Study is \nrequired due to a higher queued project dropping out of the queue, \nor a modification of a higher queued project subject to LLIP \nSection 4.6.1.6, Participating TO shall notify Large Load \nInterconnection Customer in writing. Such restudy shall take no \nlonger than forty-five (45) Calendar Days from the date of notice. \nAny cost of restudy shall be borne by the Large Load \nInterconnection Customer. \n \n4.6.1.6 Modifications.  At any time during the course of the \nInterconnection Studies, the Large Load Interconnection Customer, \nthe Participating TO, or the ISO, as applicable, may identify \nchanges to the planned interconnection that may improve the costs \nand benefits (including reliability) of the interconnection, and the \nability of the proposed change to accommodate the Interconnection \nRequest.  To the extent the identified changes are acceptable to the \nParticipating TO, the ISO, as applicable, and Large Load \nInterconnection Customer, such acceptance not to be unreasonably \nwithheld, Participating TO shall modify the configuration in \naccordance with such changes without altering the Interconnection \nRequest’s eligibility for participating in Interconnection Studies.          \n \n4.6.1.6.1 For any modifications other than those agreed upon under \nLLIP Section 4.6.1.6, the Large Load Interconnection \nCustomer must first request that Participating TO evaluate \nwhether such modification is a Material Modification.  In \nresponse to Large Load Interconnection Customer's \nrequest, Participating TO, in coordination with the ISO, if \napplicable, shall evaluate the proposed modifications prior \nto making them and inform Large Load Interconnection \nCustomer in writing of whether the modifications would \nconstitute a Material Modification.  The Participating TO \nmay, at its option, engage the services of the ISO to assist \nin the assessment of the modification.  Any change to the \nPoint of Interconnection shall constitute a Material \nModification."},{"page":310,"startToken":113966,"endToken":114297,"text":"21 \n \n \nThe Large Load Interconnection Customer shall provide \nthe Participating TO a $30,000 deposit for the modification \nassessment at the time the request is submitted.  Except as \nprovided below, any modification assessment will be \nconcluded, and a response provided to the Large Load \nInterconnection Customer in writing, within forty-five (45) \nCalendar Days from the date the Participating TO receives \nall of the following: 1) the Large Load Interconnection \nCustomer’s written notice to modify the project; 2) a \nnarrative description of the requested modification; 3) \ntechnical data required to assess the request, including an \nupdated technical data form (Appendix A to Attachment 1 \nto this LLIP), if requested by the Participating TO; 4) any \nadditional information requested by Participating TO; and \n5) payment of the $30,000 deposit.  If applicable, the \nParticipating TO shall coordinate the modification request \nwith the ISO.  If the modification assessment cannot be \ncompleted within that time period, the Participating TO \nshall notify the Large Load Interconnection Customer and \nprovide an estimated completion date with an explanation \nof the reasons why additional time is required.  The Large \nLoad Interconnection Customer will be responsible for the \nactual costs incurred by the Participating TO and, if \napplicable, the ISO in conducting the modification \nassessment.  If the actual costs of the modification \nassessment are less than the deposit provided by the Large \nLoad Interconnection Customer, the Large Load \nInterconnection Customer will be refunded the balance \nwithin thirty (30) Calendar Days of being invoiced.  If the \nactual costs of the modification assessment are greater than \nthe deposit provided by the Large Load Interconnection \nCustomer, the Large Load Interconnection Customer shall \npay the balance within thirty (30) Calendar Days of being \ninvoiced. \n \nIf the proposed modification is determined to be a Material \nModification by the Participating TO pursuant to the \nmodification assessment described above, the Large Load \nInterconnection Customer shall then either:  \n \n(i) \nwithdraw the proposed modification, or  \n \n(ii) withdraw the proposed modification and submit a \nnew Interconnection Request reflecting such \nmodification."},{"page":311,"startToken":114297,"endToken":114757,"text":"22 \n \n4.6.2   Optional Flexible Interim Load Interconnection (FILI) Study and \nAgreement. If the Large Load Interconnection Study finds that the full \namount of the Interconnection Request cannot be accommodated prior to \nthe time that all ECLL Interconnection Facilities are in service, the Large \nLoad Interconnection Customer may request a FILI Study, by written \nnotice to the Participating TO within thirty (30) Calendar Days after \nreceipt of the final Large Load Interconnection Study report, to \ndetermine, consistent with Section 10A.4 of the TO Tariff, whether \nInterim Firm Interconnection Service and/or FILI Service may be \nprovided.  A Large Load Interconnection Customer may elect to be \nstudied only for Interim Firm Interconnection Service and not FILI \nService.  If the Large Load Interconnection Customer elects to proceed \nwith a FILI Study, the Participating TO shall use Reasonable Efforts to \ncomplete the FILI Study within sixty (60) Calendar Days after receipt of \nsuch request. Large Load Interconnection Customer will be responsible \nfor the actual costs of the FILI Study. The Participating TO will perform \nthe FILI Study. At any time the Participating TO determines that it will \nnot meet the required time frame for completing the FILI Study, \nParticipating TO shall notify the Large Load Interconnection Customer as \nto the schedule status of the FILI Study and provide an estimated \ncompletion date with an explanation of the reasons why additional time is \nrequired. \n \n \n \n The FILI Study will determine (i) the maximum amount of Interim Firm \nInterconnection Service, if any, that can be provided prior to completion \nof the Participating TO’s Interconnection Facilities and Large Load \nNetwork Upgrades; (ii) whether the Large Load Interconnection \nCustomer is eligible to receive FILI Service and the maximum amount of \nsuch service; (iii) the conditions and limitations of such service; (iv) the \nupgrades and the associated cost; and (v) the estimated duration required \nto provide the interim service. The Participating TO will share study \nresults with the ISO for review and concurrence.  The Participating TO \nshall update its analysis of the availability of FILI Service at least \nannually under the terms of the FILI Service Agreement, and the actual \namount of FILI Service available during any operating period shall be \ndetermined by the Participating TO through operational assessments \nconducted closer to real-time operating conditions, consistent with \nSection 10A.4 of the TO Tariff.  If requested by the Large Load \nInterconnection Customer within ten (10) Business Days of the date of \nthe issuance of the FILI Study report, a Report Meeting shall be \nscheduled among the Participating TO, the ISO, and the Large Load \nInterconnection Customer. \n \n \n \nThe Large Load Interconnection Customer should note the following \nconsiderations: \na) \nTemporary limits may be adjusted if unforeseen conditions arise. \nb) \nAdvance notice of non-firm load curtailment may not be possible."},{"page":312,"startToken":114757,"endToken":115192,"text":"23 \n \nc) \nNon-firm load may be curtailed during planned or repair outages, \nwhich may last longer than 6 months. \nd) \nISO may have additional operational requirements. \ne) \nParticipating TO is not obligated to provide flexibility beyond \nwhat it can, in its sole judgment, manage operationally. \nf) \nParticipating TO’s Interconnection Facilities costs for interim \ninterconnection service will be directly assigned to the Large Load \nInterconnection Customer. \ng) \nLarge Load Interconnection Customers not adhering to the \ncontractual agreement and conditions may be curtailed indefinitely.  \n \n4.6.2.1 FILI Service Agreement. If the Large Load Interconnection \nCustomer has elected FILI Service, as reflected in the Large Load \nInterconnection Agreement, the Large Load Interconnection \nCustomer shall ensure that, prior to the Service Commencement \nDate, the Large Load Customer executes, or requests to be filed \nunexecuted with FERC, a FILI Service Agreement with the \nParticipating TO and, as applicable, the ISO, developed by the \nParticipating TO consistent with Section 10A.4 of the TO Tariff \nand in accordance with ISO Tariff Section 25.7.2. The FILI \nService Agreement shall describe the circumstances in which the \nISO or Participating TO may temporarily curtail the Large Load \nreceiving FILI Service, and the mechanism the ISO or \nParticipating TO will use to perform the curtailment. The ISO will \npost such FILI Service Agreements on the ISO Website.  \n \n4.6.3   Additional Studies. The Participating TO may identify the need for \nadditional studies to comply with Applicable Reliability Standards. These \nadditional studies may include, but are not limited to, the following: \nstability analysis, variable load impact analysis, and EMT analysis.  The \nassociated new scope will be identified in the Large Load Interconnection \nStudy pursuant to LLIP Section 4.6.1.1. The additional studies will be \nperformed by the Participating TO as part of the scope of work set forth in \nthe Large Load Interconnection Agreement. The additional studies may \nresult in the identification of additional facilities scope and cost, and may \nrequire a revision to the schedule set forth in the Large Load \nInterconnection Agreement. The Large Load Interconnection Customer \nwill be responsible for providing the necessary technical information \nand/or models requested by the Participating TO to conduct the additional \nstudies. The Large Load Interconnection Customer will be responsible for \nthe costs of such studies.            \n \nIf an additional study results in the need to revise the scope of work of the \nLarge Load Network Upgrades identified in the Large Load \nInterconnection Study and the updated assigned costs have increased by \nmore than twenty-five percent (25%) compared to costs identified in the \nLarge Load Interconnection Study report, the Large Load Interconnection"},{"page":313,"startToken":115192,"endToken":115577,"text":"24 \n \nCustomer shall not be subject to a Withdrawal Penalty under LLIP Section \n3.10.1 if the Interconnection Request is withdrawn within thirty (30) \nCalendar Days of receipt of the additional study report.  If the Large Load \nInterconnection Customer elects to continue with its Interconnection \nRequest, the Large Load Interconnection Agreement will be amended to \nreflect the results of the additional study. \n \n4.6.4   Financing of Participating TO’s Interconnection Facilities and Large \nLoad Network Upgrades.  The responsibility to finance Participating \nTO’s Interconnection Facilities shall be assigned solely to the Large Load \nInterconnection Customer. The Participating TO will be responsible for \nfinancing Large Load Network Upgrades in accordance with the Large \nLoad Interconnection Agreement and, as to any Large Load Network \nUpgrades that constitute Large Load-Driven Upgrades, the Cost Recovery \nAgreement required under LLIP Section 5.3.   \n \n4.7 \nInterconnection Financial Security   \n \n4.7.1 Types of Interconnection Financial Security.  The Interconnection \nFinancial Security posted by a Large Load Interconnection Customer may \nbe any combination of the following types of Interconnection Financial \nSecurity provided in favor of the Participating TO: \n \n(a) \nan irrevocable and unconditional letter of credit issued by a bank \nor financial institution that has a credit rating of A or better by \nStandard and Poor’s or A2 or better by Moody’s;  \n \n(b) \nan irrevocable and unconditional surety bond issued by an \ninsurance company that has a credit rating of A or better by \nStandard and Poor’s or A2 or better by Moody’s; \n \n(c) \nan unconditional and irrevocable guaranty issued by a company \nthat has a credit rating of A or better by Standard and Poor’s or A2 \nor better by Moody’s; \n \n(d) \na cash deposit standing to the credit of the Participating TO and in \nan interest-bearing escrow account maintained at a bank or \nfinancial institution that is reasonably acceptable to the \nParticipating TO; \n \n(e) \na certificate of deposit in the name of the Participating TO issued \nby a bank or financial institution that has a credit rating of A or \nbetter by Standard and Poor’s or A2 or better by Moody’s; or  \n \n(f) \na payment bond certificate in the name of the Participating TO \nissued by a bank or financial institution that has a credit rating of A \nor better by Standard and Poor’s or A2 or better by Moody’s."},{"page":314,"startToken":115577,"endToken":116000,"text":"25 \n \n \nInterconnection Financial Security instruments as listed above shall be in \nsuch form as the Participating TO may reasonably require from time to \ntime by notice to Large Load Interconnection Customers, or in such other \nform as has been evaluated and approved as reasonably acceptable by the \nParticipating TO.     \n \nThe Participating TO shall require the use of standardized forms of \nInterconnection Financial Security to the greatest extent possible.  If at any \ntime the guarantor of the Interconnection Financial Security fails to \nmaintain the credit rating required by this LLIP Section 4.7.1, the Large \nLoad Interconnection Customer shall provide to the Participating TO \nreplacement Interconnection Financial Security meeting the requirements \nof this LLIP Section 4.7.1 within five (5) Business Days of the change in \ncredit rating.  \n \nInterest on a cash deposit standing to the credit of the Participating TO in \nan interest-bearing escrow account under subpart (d) of this LLIP Section \n4.7.1 will accrue to the Large Load Interconnection Customer’s benefit.  \n \nExecution and filing of the Large Load Interconnection Agreement at \nFERC are addressed in LLIP Section 5. \n \nSection 5. \nLarge Load Interconnection Agreement  \n \n5.1 \nTender.  Within thirty (30) Calendar Days after the Report Meeting for the final Large \nLoad Interconnection Study report or, if the Large Load Interconnection \nCustomer has timely requested a FILI Study pursuant to LLIP Section 4.6.2, \nwithin thirty (30) Calendar Days after issuance of the final FILI Study report (or, \nif a Report Meeting is requested for the FILI Study, after such Report Meeting), \nthe Participating TO shall tender to the Large Load Interconnection Customer a \ndraft Large Load Interconnection Agreement developed by the Participating TO \nconsistent with the TO Tariff, this LLIP, and the results of the Interconnection \nStudies.  The draft Large Load Interconnection Agreement shall address, without \nlimitation, the scope, schedule, cost responsibility, payment provisions, cost \nrecovery, and financial security for the Participating TO’s Interconnection \nFacilities and Large Load Network Upgrades, and any applicable operating \nrequirements.  The Large Load Interconnection Customer shall provide written \ncomments, or notification of no comments, on the draft Large Load \nInterconnection Agreement within thirty (30) Calendar Days. \n \n5.2 \nNegotiation.  Notwithstanding LLIP Section 5.1, at the request of Large Load \nInterconnection Customer, Participating TO shall begin negotiations with Large \nLoad Interconnection Customer concerning the terms and conditions of the Large \nLoad Interconnection Agreement at any time after the Participating TO provides \nthe Large Load Interconnection Customer with the final Large Load \nInterconnection Study report, or the final FILI Study report, if applicable."},{"page":315,"startToken":116000,"endToken":116513,"text":"26 \n \nParticipating TO and Large Load Interconnection Customer shall negotiate in \ngood faith concerning any disputed provisions of the draft Large Load \nInterconnection Agreement for not more than sixty (60) Calendar Days after the \nParticipating TO provides the Large Load Interconnection Customer with the final \nLarge Load Interconnection Study report or the final FILI Study report if \napplicable.  If Large Load Interconnection Customer determines that negotiations \nare at an impasse, it may request termination of the negotiations at any time after \ntender of the draft Large Load Interconnection Agreement pursuant to LLIP \nSection 5.1 and request submission of the unexecuted Large Load Interconnection \nAgreement with FERC or initiate Dispute Resolution procedures pursuant to LLIP \nSection 7.2.  If Large Load Interconnection Customer requests termination of the \nnegotiations, but within sixty (60) Calendar Days after issuance of the final Large \nLoad Interconnection Study report, or the final FILI Study report if applicable, \nfails to request either the filing of the unexecuted Large Load Interconnection \nAgreement or initiate Dispute Resolution, it shall be deemed to have withdrawn \nits Interconnection Request.  Unless otherwise agreed by the Parties, if Large \nLoad Interconnection Customer has not executed the Large Load Interconnection \nAgreement, requested filing of an unexecuted Large Load Interconnection \nAgreement, or initiated Dispute Resolution procedures pursuant to LLIP Section \n7.2 within the time period set forth in LLIP Section 5.3, it shall be deemed to have \nwithdrawn its Interconnection Request.  Participating TO shall provide to Large \nLoad Interconnection Customer a final Large Load Interconnection Agreement \nwithin fifteen (15) Business Days after the completion of the negotiation process. \n \n \nThe Participating TO may declare an impasse upon sixty (60) Calendar Days after \nissuance of the final Large Load Interconnection Study report, or the final FILI \nStudy report if applicable, or at any time following sixty (60) Calendar Days after \nissuance of the final Large Load Interconnection Study report, or the final FILI \nStudy report if applicable, if the Parties have agreed to extend negotiation of the \nLarge Load Interconnection Agreement.  If the Participating TO declares an \nimpasse, the Participating TO will file the Large Load Interconnection Agreement \nunexecuted with FERC within twenty-one (21) Calendar Days. \n \n5.3 \nExecution and Filing \nWithin thirty (30) Business Days after receipt of the final Large Load \nInterconnection Agreement, Large Load Interconnection Customer shall either: (i) \nexecute the final Large Load Interconnection Agreement and return it to \nParticipating TO; or (ii) request in writing that Participating TO file with FERC \nthe Large Load Interconnection Agreement in unexecuted form, or its \nInterconnection Request shall be deemed withdrawn and subject to LLIP Section \n3.10.  To the extent FERC filing is required, as soon as practicable, but not later \nthan ten (10) Business Days after receiving either the executed Large Load \nInterconnection Agreement or the request to file an unexecuted Large Load \nInterconnection Agreement, Participating TO shall file the Large Load \nInterconnection Agreement with FERC, together with, in the case of an \nunexecuted Large Load Interconnection Agreement, its explanation of any matters \nas to which Large Load Interconnection Customer and Participating TO disagree"},{"page":316,"startToken":116513,"endToken":116912,"text":"27 \n \nand support for the costs that Participating TO proposes to charge to Large Load \nInterconnection Customer under the Large Load Interconnection Agreement.  An \nunexecuted Large Load Interconnection Agreement should contain terms and \nconditions deemed appropriate by Participating TO for the Interconnection \nRequest.  If the Parties agree to proceed with design, procurement, and \nconstruction of facilities and upgrades under the agreed-upon terms of the \nunexecuted Large Load Interconnection Agreement, they may proceed pending \nFERC action.  As a condition to the Participating TO’s design, procurement, \nconstruction, or operation of any Large Load-Driven Upgrades (as defined in the \npro forma Large Load Cost Recovery Agreement set forth in Appendix V to the \nTO Tariff) associated with the Interconnection Request, the Large Load \nInterconnection Customer shall also, within the same period and subject to the \nsame consequences as the Large Load Interconnection Agreement, execute and \nmaintain a Cost Recovery Agreement substantially in the form set forth in \nAppendix V to the TO Tariff, or, if the Large Load Interconnection Customer \nrequests that the Cost Recovery Agreement be filed unexecuted with FERC, \ncomply with that agreement as made effective by FERC.  A Cost Recovery \nAgreement required by this LLIP Section 5.3 is entered into pursuant to the TO \nTariff. \n \n \n5.4 \nCommencement of Interconnection Activities \nIf Large Load Interconnection Customer executes the final Large Load \nInterconnection Agreement, Participating TO and Large Load Interconnection \nCustomer shall perform their respective obligations in accordance with the terms \nof the Large Load Interconnection Agreement, subject to modification by FERC.  \nUpon submission of an unexecuted Large Load Interconnection Agreement, Large \nLoad Interconnection Customer and Participating TO shall promptly comply with \nthe unexecuted Large Load Interconnection Agreement, if agreed to by the Parties \npursuant to LLIP Section 5.3, subject to modification by FERC. \n \nSection 6. \nConstruction of Participating TO's Interconnection Facilities and Large \nLoad Network Upgrades  \n \n \n6.1 \nSchedule \nParticipating TO and Large Load Interconnection Customer shall negotiate in \ngood faith concerning a schedule for the Participating TO’s construction of \nParticipating TO's Interconnection Facilities and the Large Load Network \nUpgrades.  \n \n \n6.2 \nConstruction Sequencing \n \n6.2.1 General.  In general, the Service Commencement Date will determine the \nsequence of construction of Large Load Network Upgrades. \n \n6.2.2 Advancing Construction of Large Load Network Upgrades that are \nPart of an Expansion Plan of the Participating TO.  A Large Load \nInterconnection Customer with a Large Load Interconnection Agreement,"},{"page":317,"startToken":116912,"endToken":117311,"text":"28 \n \nin order to maintain its Service Commencement Date, may request that \nParticipating TO advance to the extent necessary the completion of Large \nLoad Network Upgrades that:  (i) are necessary to support such Service \nCommencement Date and (ii) would otherwise not be completed, pursuant \nto an expansion plan of Participating TO or approved ISO Transmission \nPlan covering the Participating TO’s facilities, in time to support such \nService Commencement Date.  Upon such request, Participating TO will \nuse Reasonable Efforts to advance the construction of such Large Load \nNetwork Upgrades to accommodate such request; provided that Large \nLoad Interconnection Customer commits to pay Participating TO any \nassociated expediting costs.   \n \n6.3 \nSpecial Provisions for Affected Systems   \nThe Large Load Interconnection Customer shall timely enter into and maintain an \nagreement with each applicable Affected System Operator for each addition, \nmodification, or upgrade to an Affected System identified through the \nInterconnection Studies or an applicable Affected System study.  The agreement \nshall specify the terms governing payments to be made by the Large Load \nInterconnection Customer to the Affected System Operator, including financial \nsecurity or credit support sufficient to protect the Affected System Operator and \nits other customers against cost shifting.  Where a Cost Recovery Agreement \napplies, the Large Load Interconnection Customer shall provide the Participating \nTO the evidence of such agreements required by, and within the time specified in, \nthe Cost Recovery Agreement, and the Participating TO may decline to \ncommence, or may suspend, construction as provided in the Cost Recovery \nAgreement.   \n \nSection 7. \nMiscellaneous \n \n7.1 \nConfidentiality \n \nFor the purposes of this LLIP Section 7.1, “Party” or “Parties” shall mean the \nParticipating TO, Large Load Interconnection Customer, ISO, or any combination \nof the Participating TO, Large Load Interconnection Customer, or ISO.  \n \nConfidential Information shall include, without limitation, all information relating \nto a Party's technology, research and development, business affairs, and pricing. \n \nInformation is Confidential Information only if it is clearly designated or marked \nin writing as confidential on the face of the document, or, if the information is \nconveyed orally or by inspection, if the Party providing the information orally \ninforms the Party receiving the information that the information is confidential. \n \nIf requested by either Party, the other Party shall provide in writing, the basis for \nasserting that the information referred to in this LLIP Section 7.1 warrants \nconfidential treatment, and the requesting Party may disclose such writing to the"},{"page":318,"startToken":117311,"endToken":117780,"text":"29 \n \nappropriate Governmental Authority.  Each Party shall be responsible for the \ncosts associated with affording confidential treatment to its information. \n \n \n \n7.1.1 Scope.  Confidential Information shall not include information that the \nreceiving Party can demonstrate: (1) is generally available to the public \nother than as a result of a disclosure by the receiving Party; (2) was in the \nlawful possession of the receiving Party on a non-confidential basis before \nreceiving it from the disclosing Party; (3) was supplied to the receiving \nParty without restriction by a third party, who, to the knowledge of the \nreceiving Party after due inquiry, was under no obligation to the disclosing \nParty to keep such information confidential; (4) was independently \ndeveloped by the receiving Party without reference to Confidential \nInformation of the disclosing Party; (5) is, or becomes, publicly known, \nthrough no wrongful act or omission of the receiving Party or Breach of \nthe Large Load Interconnection Agreement; or (6) is required, in \naccordance with LLIP Section 7.1.6, Order of Disclosure, to be disclosed \nby any Governmental Authority or is otherwise required to be disclosed by \nlaw or subpoena, or is necessary in any legal proceeding establishing \nrights and obligations under the Large Load Interconnection Agreement. \nInformation designated as Confidential Information will no longer be \ndeemed confidential if the Party that designated the information as \nconfidential notifies the other Party that it no longer is confidential. \n \n7.1.2  Release of Confidential Information.  Neither Party shall release or \ndisclose Confidential Information to any other person, except to its \nAffiliates (limited by the Standards of Conduct requirements), employees, \nconsultants, Affected System Operators, the Large Load Customer, or to \nparties who may be providing or considering providing financing to or \nequity participation with Large Load Interconnection Customer or the \nLarge Load Customer, or to potential purchasers or assignees of Large \nLoad Interconnection Customer or the Large Load Customer, on a need-\nto-know basis in connection with these procedures, unless such person has \nfirst been advised of the confidentiality provisions of this LLIP Section 7.1 \nand has agreed to comply with such provisions.  Notwithstanding the \nforegoing, a Party providing Confidential Information to any person shall \nremain primarily responsible for any release of Confidential Information \nin contravention of this LLIP Section 7.1. \n \n7.1.3 Rights.  Each Party retains all rights, title, and interest in the Confidential \nInformation that each Party discloses to the other Party.  The disclosure by \neach Party to the other Party of Confidential Information shall not be \ndeemed a waiver by either Party or any other person or entity of the right \nto protect the Confidential Information from public disclosure. \n \n7.1.4 No Warranties.  By providing Confidential Information, neither Party \nmakes any warranties or representations as to its accuracy or \ncompleteness.  In addition, by supplying Confidential Information, neither"},{"page":319,"startToken":117780,"endToken":118273,"text":"30 \n \nParty obligates itself to provide any particular information or Confidential \nInformation to the other Party nor to enter into any further agreements or \nproceed with any other relationship or joint venture. \n \n7.1.5 Standard of Care.  Each Party shall use at least the same standard of care \nto protect Confidential Information it receives as it uses to protect its own \nConfidential Information from unauthorized disclosure, publication or \ndissemination.  Each Party may use Confidential Information solely to \nfulfill its obligations to the other Party under these procedures or its \nregulatory requirements. \n \n7.1.6 Order of Disclosure.  If a court or a Governmental Authority or entity \nwith the right, power, and apparent authority to do so requests or requires \neither Party, by subpoena, oral deposition, interrogatories, requests for \nproduction of documents, administrative order, or otherwise, to disclose \nConfidential Information, that Party shall provide the other Party with \nprompt notice of such request(s) or requirement(s) so that the other Party \nmay seek an appropriate protective order or waive compliance with the \nterms of these confidentiality provisions. Notwithstanding the absence of a \nprotective order or waiver, the Party may disclose such Confidential \nInformation which, in the opinion of its counsel, the Party is legally \ncompelled to disclose.  Each Party will use Reasonable Efforts to obtain \nreliable assurance that confidential treatment will be accorded any \nConfidential Information so furnished. \n \n7.1.7 Remedies.  The Parties agree that monetary damages would be inadequate \nto compensate a Party for the other Party's Breach of its obligations under \nthis LLIP Section 7.1.  Each Party accordingly agrees that the other Party \nshall be entitled to equitable relief, by way of injunction or otherwise, if \nthe first Party Breaches or threatens to Breach its obligations under this \nLLIP Section 7.1, which equitable relief shall be granted without bond or \nproof of damages, and the receiving Party shall not plead in defense that \nthere would be an adequate remedy at law.  Such remedy shall not be \ndeemed an exclusive remedy for the Breach of this LLIP Section 7.1, but \nshall be in addition to all other remedies available at law or in equity.  The \nParties further acknowledge and agree that the covenants contained herein \nare necessary for the protection of legitimate business interests and are \nreasonable in scope.  No Party, however, shall be liable for indirect, \nincidental, or consequential or punitive damages of any nature or kind \nresulting from or arising in connection with this LLIP Section 7.1. \n \n7.1.8 Disclosure to FERC, its Staff, or a State.  Notwithstanding anything in \nthis LLIP Section 7.1 to the contrary, and pursuant to 18 CFR section \n1b.20, if FERC or its staff, during the course of an investigation or \notherwise, requests information from one of the Parties that is otherwise \nrequired to be maintained in confidence pursuant to the LLIP, the Party \nshall provide the requested information to FERC or its staff, within the"},{"page":320,"startToken":118273,"endToken":118726,"text":"31 \n \ntime provided for in the request for information.  In providing the \ninformation to FERC or its staff, the Party must, consistent with 18 CFR \nsection 388.112, request that the information be treated as confidential and \nnon-public by FERC and its staff and that the information be withheld \nfrom public disclosure.  Parties are prohibited from notifying the other \nParty prior to the release of the Confidential Information to FERC or its \nstaff.  The Party shall notify the other Party to the Large Load \nInterconnection Agreement when it is notified by FERC or its staff that a \nrequest to release Confidential Information has been received by FERC, at \nwhich time either of the Parties may respond before such information \nwould be made public, pursuant to 18 CFR section 388.112.  Requests \nfrom a state regulatory body conducting a confidential investigation shall \nbe treated in a similar manner, consistent with applicable state rules and \nregulations. \n \n7.1.9 Subject to the exception in LLIP Section 7.1.8, any information that a \nParty claims is competitively sensitive, commercial or financial \ninformation (\"Confidential Information\") shall not be disclosed by the \nother Party to any person not employed or retained by the other Party, \nexcept to the extent disclosure is (i) required by law; (ii) reasonably \ndeemed by the disclosing Party to be required to be disclosed in \nconnection with a dispute between or among the Parties, or the defense of \nlitigation or dispute; (iii) otherwise permitted by consent of the other \nParty, such consent not to be unreasonably withheld;  or (iv) necessary to \nfulfill its obligations under this LLIP or as a Participating TO, including \ndisclosing the Confidential Information to the ISO or to a subregional, \nregional or national reliability organization or planning group.  The Party \nasserting confidentiality shall notify the other Party in writing of the \ninformation it claims is confidential.  Prior to any disclosures of the other \nParty's Confidential Information under this subparagraph, or if any third \nparty or Governmental Authority makes any request or demand for any of \nthe information described in this subparagraph, the disclosing Party agrees \nto promptly notify the other Party in writing and agrees to assert \nconfidentiality and cooperate with the other Party in seeking to protect the \nConfidential Information from public disclosure by confidentiality \nagreement, protective order or other reasonable measures. \n \n7.1.10 This provision shall not apply to any information that was or is hereafter in \nthe public domain (except as a result of a Breach of this provision). \n \n7.1.11 Participating TO shall, at Large Load Interconnection Customer's election, \ndestroy, in a confidential manner, or return the Confidential Information \nprovided at the time the Confidential Information is no longer needed. \n \n \n7.2 \nDisputes"},{"page":321,"startToken":118726,"endToken":118826,"text":"32 \n \n \n \n7.2.1  Submission.  In the event either Party has a dispute, or asserts a claim, that \narises out of or in connection with the Large Load Interconnection \nAgreement, the LLIP, or their performance, such Party (the \"disputing \nParty\") shall provide the other Party with written notice of the dispute or \nclaim (\"Notice of Dispute\").  Such dispute or claim shall be resolved in \naccordance with Section 14 of the TO Tariff, including, as applicable, the \nISO ADR Procedures; provided, however, that disputes arising under a \nCost Recovery Agreement shall be resolved under the dispute resolution \nprovisions of that agreement."},{"page":322,"startToken":118826,"endToken":119065,"text":"33 \n \n  \nATTACHMENT 1 \nTO APPENDIX VI – LARGE LOAD INTERCONNECTION PROCEDURES \n \nINTERCONNECTION REQUEST FORM \n \nThis Interconnection Request is submitted to LS Power Grid California, LLC (“Participating \nTO”) by the Eligible Customer for Large Load (“ECLL”) identified below, acting as the Large \nLoad Interconnection Customer, pursuant to LLIP Section 4.2.1 and Section 10A of the TO \nTariff.  Consistent with LLIP Section 3.1, the Large Load Interconnection Customer shall send a \ncopy of this Interconnection Request to the ISO.  Capitalized terms not defined herein have the \nmeanings set forth in the LLIP or, if not defined in the LLIP, in Section 3 of the TO Tariff. \n \nI. \n Large Load Interconnection Customer (ECLL) Contact Information \nCompany Name \n \nType of ECLL (UDC or MSS) \n \nRepresentative \n \nAddress \n \nEmail \n \nPhone \n \n \nII. \nLarge Load Customer Information \nLarge Load Customer Name \n \nLarge Load Customer Representative and \nContact Information \n \nLarge Load Site Location/Address \n \nType of Large Load Facility (e.g., data \ncenter, industrial) \n \nOther ECLL interconnection requests \nsubmitted for the same Large Load \nCustomer or any of its affiliates (see \nSection 10A.2.1 of the TO Tariff) \n \n \nIII. \nPoint of Interconnection \n \nPlease identify the location and voltage \nlevel of the preferred Point of \nInterconnection in as much detail as \npossible. If proposing to connect to a \ntransmission line, provide the approximate \ndistance from one of the existing line \nterminals.  The Point of Interconnection \nwill serve as the Point of Withdrawal under \nthe TO Tariff."},{"page":323,"startToken":119065,"endToken":119269,"text":"34 \n \n \nIV. \nLarge Load Capacity and Load Ramp Schedule \n \n \nProposed load ramp schedule identifying anticipated load additions over time: \nDate (MM/DD/YYYY) \nIncremental Load (MW) \nCumulative Load (MW) \n \n \n \n \n \n \n \n \n \n \n \n \n \nV. \nProposed Service Commencement Date and Term \n \n \nVI. \nSource of Power \n \n \nVII. \nSite Plan, Site Control, and Permits \n \nPlease attach: (a) a site plan for the Large Load; (b) documentation demonstrating Site Control, \nas defined in Section 3 of the TO Tariff; and (c) documentation demonstrating that the Large \nMaximum Large Load capacity requested \nat the Point of Interconnection (MW) (see \nLLIP Section 3.6) \n \nMaximum capacity the Large Load is \ncapable of withdrawing, if greater than the \namount requested, and the proposed means \nof limiting withdrawals to the requested \namount \n \nExpected power factor and load factor \n \nProposed date for energizing the ECLL \nInterconnection (MM/DD/YYYY) \n \nProposed Service Commencement Date \n(MM/DD/YYYY) (see LLIP Section 3.7) \n \nProposed term of service (years) \n \nPlease identify the electrical location of the \nsource of power to be delivered to the \nLarge Load, if known.  If the source of the \npower is not known, a system purchase \nwill be assumed.  Nothing in this \nInterconnection Request constitutes a \nrequest for transmission service (see LLIP \nSection 3.2.2)."},{"page":324,"startToken":119269,"endToken":119544,"text":"35 \n \nLoad Customer has local permits and regulatory approvals for development of the Large Load, \nconsistent with Section 10A.2.1(f) of the TO Tariff. \n \nVIII. Co-Located Generation \n \nWill the Large Load be co-located with a \ngenerating facility? (Yes/No) \n \nWill the generating facility export to the \nISO Controlled Grid? (Yes/No) \n \nGenerating facility queue number or, if \nexecuted, identification of its generator \ninterconnection agreement \n \nGenerating facility nameplate capacity \n(MW) \n \n \nIX. \nSingle-Line Diagram and Modeling Information \n \nPlease attach a single-line diagram of the Large Load and the Large Load Interconnection \nCustomer’s Interconnection Facilities and/or KMZ files to this Interconnection Request.  Please \nprovide power flow modeling files (PSS/E or PSLF format preferred) or spreadsheet format \ncontaining modeling data such as impedances and ratings of customer-owned equipment. Also \nprovide short-circuit modeling data, dynamic and electromagnetic transient (EMT) models, load \ncharacteristics (including ride-through capability, ramp rates, and harmonic characteristics), any \nother details to be taken into consideration in the Interconnection Studies, and the completed \ntechnical data form in the form of Appendix A to this Attachment 1. \n \nX. \nRequired Submittals (LLIP Section 4.2.1) \nItem \nIncluded (Yes/No) \nInterconnection Study Deposit of $250,000 \n \nCommercial Readiness Deposit equal to \ntwo times the Interconnection Study \nDeposit, in a form permitted by LLIP \nSection 4.7.1 \n \nDemonstration of Site Control \n \nCompleted technical data form in the form \nof Appendix A to this Attachment 1 (TO \nTariff Section 10A.2.1(j)) \n \nCopy of this Interconnection Request sent \nto the ISO \n \n \nXI. \nAcknowledgment \n \nBy submission of this Interconnection Request, the Large Load Interconnection Customer \nacknowledges that additional detail may be required to satisfactorily perform the Interconnection"},{"page":325,"startToken":119544,"endToken":119619,"text":"36 \n \nStudies related to this Interconnection Request and agrees to work with LS Power Grid \nCalifornia, LLC in good faith to provide additional information as necessary.  The Large Load \nInterconnection Customer may designate information in this Interconnection Request, including \nthe identity of the Large Load Customer, as Confidential Information in accordance with LLIP \nSection 7.1. \n \nInterconnection Request Submitted By: \n \n \n \n \n \n \n \n \n \nInterconnection Request Received By LS Power Grid California, LLC: \n \n \n \n \n \n \n \n \n \nPrinted Name: \n \nDate: \n \n \nPrinted Name: \n \nDate:"},{"page":326,"startToken":119619,"endToken":119632,"text":"Attachment 3 \n \nDirect Testimony of Patrick Hayes (Exhibit No. LSC-100) and \nSupporting Exhibits"},{"page":327,"startToken":119632,"endToken":119680,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \nLS Power Grid California, LLC \nCalifornia Independent System Operator Corporation \n) \n) \nDocket No. \nDocket No. \nER27-___-000 \nEL26-71-___ \n \n \n \n \n \nDIRECT TESTIMONY \nOF \nPATRICK HAYES \n \n \nON BEHALF OF  \nLS POWER GRID CALIFORNIA, LLC \n \n \n \n \n \nLarge Load Network Upgrade Cost Recovery \n \n \n \n \n \n \n \n \nNovember 2026"},{"page":328,"startToken":119680,"endToken":119725,"text":"DIRECT TESTIMONY OF PATRICK HAYES \n \nTABLE OF CONTENTS \n \nI. \nINTRODUCTION AND EXPERIENCE ................................................................................ 1 \nII. PURPOSE AND SCOPE OF TESTIMONY .......................................................................... 2 \nIII. FERC SHOW CAUSE ORDERS............................................................................................ 3 \nIV. CAISO STAKEHOLDER PROCESS ..................................................................................... 6 \nV. COST RECOVERY AGREEMENT ....................................................................................... 8 \nVI. TARIFF IMPLEMENTATION AND REVIEW ................... Error! Bookmark not defined."},{"page":329,"startToken":119725,"endToken":119747,"text":"EXHIBITS TO \nDIRECT TESTIMONY OF PATRICK HAYES \n \n \nExhibit No. \nDescription \n \nLSC-101: \nLSC-102: \nLSC-103:  \n \n \n \nIllustrative MTRC Calculation \nExample Reconciliation Statement \nExample Invoice Statement"},{"page":330,"startToken":119747,"endToken":119947,"text":"Page 1 \n \nDIRECT TESTIMONY OF \n \nPATRICK HAYES \n \n \nI. \nINTRODUCTION AND EXPERIENCE \nQ. \nPLEASE STATE YOUR NAME AND BUSINESS ADDRESS. \n1 \nA. \nMy name is Patrick Hayes. My business address is 16150 Main Circle Drive, Suite 310, \n2 \nChesterfield, Missouri 63017. \n3 \nQ. \nBY WHOM ARE YOU EMPLOYED, AND WHAT ARE YOUR \n4 \nRESPONSIBILITIES? \n5 \nA. \nI am employed by LS Power and serve as Associate Vice President, Transmission \n6 \nRegulatory. I lead regulatory strategy for LS Power’s transmission business across the \n7 \nCalifornia Independent System Operator (“CAISO”), Midcontinent Independent System \n8 \nOperator, PJM Interconnection, New York Independent System Operator, and other \n9 \nregional markets. My responsibilities include Federal Energy Regulatory Commission \n10 \n(“FERC”) policy, regional transmission planning, competitive transmission development, \n11 \ncost allocation and recovery, tariff development, and large-load interconnection. \n12 \nQ. \nPLEASE SUMMARIZE YOUR PROFESSIONAL EXPERIENCE AND \n13 \nEDUCATION. \n14 \nA. \nI previously served as LS Power’s Director of Transmission Business Development and \n15 \nManager of Transmission Policy. Earlier in my career, I held transmission policy, energy \n16 \ntrading, and asset optimization positions with Ameren. My experience includes developing \n17 \nstrategies for competitive transmission projects and utility partnerships, negotiating \n18 \ncommercial and ownership arrangements, evaluating transmission investments, and \n19"},{"page":331,"startToken":119947,"endToken":120217,"text":"Page 2 \n \ncoordinating multidisciplinary teams. I received a Bachelor of Science in Accounting from \n1 \nthe University of Missouri. \n2 \nQ. \nON WHOSE BEHALF ARE YOU SUBMITTING THIS TESTIMONY? \n3 \nA. \nI am testifying on behalf of LS Power Grid California, LLC (“LSPGC”), a transmission-\n4 \nonly Participating Transmission Owner (“PTO”) in the CAISO. LSPGC owns the Gates1 \n5 \nand Round Mountain2 projects, which CAISO selected LSPGC to develop through its \n6 \ncompetitive solicitation process, and is developing additional competitively selected \n7 \nprojects. \n8 \nII. \nPURPOSE AND SCOPE OF TESTIMONY \n9 \nQ.  \nWHAT IS THE PURPOSE OF YOUR TESTIMONY? \n10 \nA. \nThe purpose of this testimony is to provide relevant context and details regarding \n11 \nLSPGC’s proposed approach to addressing the large-load cost recovery concerns \n12 \nidentified in FERC’s show cause orders. I describe the proposed Large Load Cost \n13 \nRecovery Agreement (“CRA”) and associated tariff framework, and explain how these \n14 \nmeasures assign cost responsibility for large-load-driven transmission upgrades, mitigate \n15 \ncost shifting and stranded-asset risk, avoid double recovery, and promote transparency.  \n16 \nThe CRA calculates a Minimum Transmission Revenue Contribution (“MTRC”) under \n17 \nits Schedule 5, separately from LSPGC’s Formula Rate. LSPGC continues to recover its \n18 \nformula-rate revenue requirement through the Transmission Access Charge (“TAC”), \n19 \nwith credits under the CRA flowing to transmission customers through the Transmission \n20 \n \n1 See Gates 500 kV Dynamic Reactive Support – Project Sponsor Selection Report (Jan. 17, 2020) \nhttps://www.caiso.com/documents/gates500kvdynamicreactivesupport-projectsponsorselectionreport.pdf \n2 See Round Mountain 500 kV Area Dynamic Reactive Support Project – Project Sponsor Selection Report (Feb. 28, \n2020) https://www.caiso.com/documents/roundmountain500kvareadynamicreactivesupportproject-\nprojectsponsorselectionreport.pdf"},{"page":332,"startToken":120217,"endToken":120475,"text":"Page 3 \n \nRevenue Balancing Account Adjustment (“TRBAA”). LSPGC witness D. Eric Arzola \n1 \nexplains that rate treatment in Exhibit No. LSC-200 and illustrates it in Exhibit Nos. \n2 \nLSC-201 and LSC-202. No changes to LSPGC’s Formula Rate Template or Formula \n3 \nRate Implementation Protocols (“Protocols”) are required. \n4 \nQ.  \nARE YOU SPONSORING ANY EXHIBITS IN SUPPORT OF YOUR \n5 \nTESTIMONY IN THIS CASE? \n6 \nA.  \nYes. I am sponsoring the following exhibits: \n7 \nExhibit No. \nDescription \n \nLSC-101: \nLSC-102: \nLSC-103:  \n \n \nIllustrative MTRC Calculation \nExample Reconciliation Statement \nExample Invoice Statement \n \n \nIII. \nFERC SHOW CAUSE ORDERS \n8 \nQ.  \nPLEASE DESCRIBE FERC’S SHOW CAUSE ORDERS. \n9 \nA.  \nOn June 18, 2026, the FERC instituted show cause proceedings under section 206 of the \n10 \nFederal Power Act through six show cause orders addressing the integration of large and \n11 \nco-located loads onto the interstate transmission system. Each order is directed to an \n12 \nIndependent System Operator or Regional Transmission Organization (\"ISO/RTO\") and, \n13 \nwhere applicable, its transmission-owning members.3 The orders arise from the \n14 \nCommission's preliminary finding that the existing tariffs on file with the Commission \n15 \nappear to be unjust, unreasonable, or unduly discriminatory or preferential because they \n16 \nlack sufficiently clear and consistent provisions to address the unique challenges posed \n17 \nby the rapid growth of large loads (such as data centers) and co-location arrangements \n18 \nbetween loads and generating facilities.4 \n19 \n \n3 Cal. Indep. Sys. Op. Corp., 195 FERC ¶ 61,214 (2026) (relevant CAISO Show Cause Order) (“Show Cause \nOrder”). \n4 Show Cause Order at P 38."},{"page":333,"startToken":120475,"endToken":120770,"text":"Page 4 \n \nEach respondent is directed, within 60 days of the date of the order, to either (1) show \n1 \ncause why its tariff remains just and reasonable and not unduly discriminatory or \n2 \npreferential without the provisions identified by the Commission, or (2) explain what \n3 \ntariff changes would remedy the identified concerns if the Commission were to determine \n4 \nthat the tariff is unjust and unreasonable and proceeds to establish a replacement tariff.5 \n5 \nAs relevant here, the show cause order directed to CAISO and its Participating \n6 \nTransmission Owners (the “Show Cause Order”) required respondents to show cause or \n7 \npropose remedial tariff revisions to (1) ensure transparency concerning the network \n8 \nupgrade costs to provide transmission service to Eligible Customers on behalf of large \n9 \nloads, (2) establish a pro forma cost recovery agreement to mitigate the risk of cost \n10 \nshifting among transmission customers, and (3) ensure such payments are appropriately \n11 \ncredited toward transmission owners' transmission revenue requirements consistent with \n12 \nthe Commission's cost-of-service regulations.6 \n13 \nQ.  \nDID FERC PROVIDE ANY ADDITIONAL GUIDANCE ON HOW THE COST \n14 \nRECOVERY ASPECTS SHOULD BE ADDRESSED BY RESPONDENTS? \n15 \nA.  \nYes, Commissioners Chang and See each issued separate concurrences providing \n16 \nadditional guidance on how cost recovery for large-load-driven transmission costs should \n17 \nbe approached. Commissioner Chang supported the Commission's two-part preliminary \n18 \nsolution — public posting of information on new large loads, associated network \n19 \nupgrades identified in local transmission planning, and the costs of those upgrades, \n20 \ntogether with a pro forma cost recovery agreement to help ensure that Eligible Customers \n21 \nserving large loads bear the risk and are ultimately responsible for the costs incurred to \n22 \n \n5 Id. at Ordering Para. B. \n6 Id. at P 3."},{"page":334,"startToken":120770,"endToken":121054,"text":"Page 5 \n \nprovide transmission service — as a necessary step to protect wholesale customers \n1 \nagainst unjustified cost shifts.7 Commissioner Chang also cautioned that bilateral \n2 \nagreements that simply provide transmission revenue contributions \"untethered from any \n3 \nassessment of the actual cost of providing transmission service induced by individual \n4 \nlarge loads\" may be insufficient to protect other customers against unjustified cost shifts.8 \n5 \nShe urged that the resulting regulatory and rate design not be limited to a pre-defined \n6 \nsolution set, encouraging parties to submit comprehensive records outlining various and \n7 \ninnovative approaches to customer protection, including but not limited to the Ratepayer \n8 \nProtection Pledge.9 \n9 \nCommissioner See likewise described the Commission's findings on cost recovery \n10 \nagreements between transmission owners and Eligible Customers as \"an important step in \n11 \nmitigating the risks of stranded assets if large loads prove speculative,\" and she \n12 \nhighlighted the Commission's decision to reduce unnecessary redundancy by allowing an \n13 \nEligible Customer to satisfy its financial security requirement by relying on credit support \n14 \nor other financial security that a large load customer may have posted under a retail \n15 \nagreement.10 She signaled that, as the Commission gains more experience, further \n16 \nstreamlining may be appropriate — suggesting, for example, that a cost recovery \n17 \nagreement between a transmission owner and a large load customer itself could \n18 \npotentially satisfy an Eligible Customer's financial security requirement — and stated that \n19 \nshe would be looking to ensure cost recovery agreements contain \"fair and transparent \n20 \n \n7 Show Cause Order, Comm’n. Chang Concurrence at PP 6-9. \n8 Id. at P 8. \n9  Id. at PP 8-9. \n10 Show Cause Order, Comm’n. See Concurrence at P 9."},{"page":335,"startToken":121054,"endToken":121307,"text":"Page 6 \n \nmeasures to ensure the right costs get on the right bills.\"11 More broadly, Commissioner \n1 \nSee reaffirmed the Commission's policy of rolling most network upgrade costs — \n2 \nincluding those driven by large loads — into the embedded-cost rate paid by transmission \n3 \ncustomers, but conditioned that approach on a commitment to evaluating alternative \n4 \ntransmission technologies and other tools (including alternative cost allocation structures, \n5 \ngreater clarity in transmission service agreements, accounting for state large-load-specific \n6 \ntariffs, and direct assignment in appropriate cases) that can keep costs at a responsible \n7 \nand accountable level and ensure retail consumers do not bear costs incommensurate with \n8 \nthe benefits they receive.12 \n9 \nIV. \nCAISO STAKEHOLDER PROCESS \n10 \nQ.  \nPLEASE DESCRIBE THE CAISO PROCESS FOLLOWING THE ISSUANCE OF \n11 \nTHE SHOW CAUSE ORDERS. \n12 \nA. \nCAISO convened joint coordination meetings with the California Participating \n13 \nTransmission Owners to address the Show Cause Order and CAISO’s proposed \n14 \nimplementation framework. LSPGC participated in the joint coordination process \n15 \nmeetings on July 1, July 10, July 23, and July 28; August 4, August 11, August 18, and \n16 \nAugust 25; September 1, September 8, September 10, September 15, and September 22; \n17 \nand October 23, 2026. \n18 \nThe meetings addressed applications and studies, operational requirements, cost-shift \n19 \nprevention, flexible interconnection service options, and co-located resources. The \n20 \nmeetings provided an opportunity to examine the respective roles and responsibilities of \n21 \nCAISO and load-serving, non-load-serving, and affected PTOs. \n22 \n \n11 Id. \n12 Id. at P 9."},{"page":336,"startToken":121307,"endToken":121575,"text":"Page 7 \n \nLSPGC also participated in CAISO’s public stakeholder meetings on August 19, October \n1 \n1, and October 19, 2026, and submitted written comments on CAISO’s Straw Proposal, \n2 \nDraft Final Proposal, and Draft Tariff Language. Those comments asked CAISO to \n3 \nrecognize non-load-serving and affected PTOs expressly, preserve a meaningful role for \n4 \nthose PTOs in the interconnection and study process, and address coordination and cost \n5 \nrecovery. \n6 \nQ. \nHOW DID THIS COORDINATION ADDRESS THE CIRCUMSTANCES OF \n7 \nNON-LOAD-SERVING PTOS SUCH AS LSPGC? \n8 \nA. \nLSPGC coordination highlighted the need to ensure that an affected PTO has a \n9 \nmeaningful role in the process even when that PTO does not provide retail service to the \n10 \nrequesting load. LSPGC is also a non-load-serving PTO. The CRA therefore establishes \n11 \nobligations with the Eligible Customer taking wholesale transmission service on behalf of \n12 \nthe Large Load Customer, while leaving retail recovery to applicable state law and the \n13 \nEligible Customer’s retail arrangements. \n14 \nFrom July through September 2026, the coordination included additional meetings with \n15 \nnon-load-serving PTOs and the broader California PTO group. The discussions addressed \n16 \nparticipation in the application and study process, access to information, technical \n17 \ncoordination, timing, and allocation and recovery of costs. The coordination supported \n18 \nthe development of positions reflecting the circumstances of non-load-serving PTOs for \n19 \nconsideration by the broader PTO group. \n20 \nThe coordination also included meetings with Pacific Gas and Electric Company \n21 \n(“PG&E”) in August 2026 to discuss notice, information sharing, technical consultation, \n22 \nand coordination when a large-load request affects a non-load-serving PTO’s facilities. \n23"},{"page":337,"startToken":121575,"endToken":121842,"text":"Page 8 \n \nThese efforts emphasized the distinct roles of load-serving, non-load-serving, and \n1 \naffected PTOs throughout the process. \n2 \nFrom October through November 2026, the coordination included joint cost-recovery \n3 \nmeetings with load-serving PTOs to examine potential approaches and implementation \n4 \nconsiderations, including the circumstances of non-load-serving and affected PTOs. \n5 \nThe coordination provided an opportunity to evaluate different approaches and identify \n6 \nimplementation considerations relevant to non-load-serving PTOs. LSPGC’s CRA \n7 \naddresses the cost-recovery and financial-security requirements associated with large \n8 \nloads affecting LSPGC’s facilities. \n9 \nQ.  \nBASED ON THIS PROCESS, WHAT IS LSPGC’S PROPOSED APPROACH? \n10 \nA. \nLSPGC proposes a pro forma CRA that establishes the Eligible Customer’s minimum \n11 \nrevenue contribution and related security obligations for Covered Upgrades. The CRA is \n12 \nthe form of agreement contemplated by Section 10.9 and 10A.6 of LSPGC’s \n13 \nTransmission Owner Tariff (“TO Tariff”). The applicable interconnection agreement \n14 \ngoverns physical interconnection and associated responsibilities. As Mr. Arzola explains, \n15 \nLSPGC also proposes revisions to the definition of the TRBAA and Section 5.3 of the \n16 \nTO Tariff to pass the CRA-related credits through to transmission customers. \n17 \nV. \nCOST RECOVERY AGREEMENT \n18 \nQ.  \nPLEASE DESCRIBE THE CRA. \n19 \nA.  \nThe CRA is a pro forma contract between LSPGC, as Transmission Owner, and the \n20 \nEligible Customer taking wholesale transmission service under the CAISO Tariff on \n21 \nbehalf of a Large Load Customer. The Large Load Customer executes a Limited \n22 \nAcknowledgment for the information, authorization, notice, and cooperation purposes \n23 \nstated therein, including cooperation in a transition to a Successor Eligible Customer. The \n24"},{"page":338,"startToken":121842,"endToken":122142,"text":"Page 9 \n \nLarge Load Customer is not itself a party to the wholesale payment obligations. The CRA \n1 \nestablishes the Eligible Customer’s wholesale revenue-support and security obligations \n2 \nassociated with the Large Load Facility and the Covered Upgrades, without establishing \n3 \nor prescribing the retail rates, charges, or recovery arrangements between the Eligible \n4 \nCustomer and the Large Load Customer. Covered Upgrades include the Large Load-\n5 \nDriven Upgrades and any LSPGC-owned CAISO-Assigned Regional Project share \n6 \nidentified in the applicable Schedules for which an Annual MTRC is established. \n7 \nAffected System Upgrades and regional project shares owned by another entity are \n8 \naddressed through separate arrangements under Sections 4.2 and 6.3.6, rather than \n9 \nincluded in LSPGC’s MTRC absent the authorization and conditions specified in the \n10 \nCRA. \n11 \nQ.  \nHOW DOES THE CRA ALIGN WITH THE COST RECOVERY PRINCIPLES \n12 \nOUTLINED IN THE SHOW CAUSE ORDER? \n13 \nA. \nAt a high level, the CRA responds directly to the three cost-recovery concerns identified \n14 \nin the Show Cause Order by: (i) establishing a pro forma contract between LSPGC and \n15 \nthe Eligible Customer that formalizes cost responsibility for the Covered Upgrades; (ii) \n16 \nestablishing payment and security obligations designed to mitigate cost shifting to other \n17 \ntransmission customers; and (iii) providing credits to transmission customers through the \n18 \nTRBAA to prevent duplicate recovery. The CRA does not change CAISO cost allocation. \n19 \nTRBAA Credits are passed through the TRBAA, not as Formula Rate revenue credits. \n20 \nLSPGC’s existing Attachment 1a identifies project plant, and its existing Attachment 9, \n21 \nLine 18 removes revenue credits included in the TRBAA from Formula Rate revenue \n22 \ncredits. These existing provisions prevent the same amounts from being credited twice \n23 \nand require no change to the Formula Rate Template. \n24"},{"page":339,"startToken":122142,"endToken":122438,"text":"Page 10 \n \nQ.  \nPLEASE DESCRIBE HOW THE CRA CALCULATES THE ELIGIBLE \n1 \nCUSTOMER'S PAYMENT OBLIGATION. \n2 \nA.  \nThe core payment mechanism is the Supplemental Minimum Transmission Revenue \n3 \nContribution (the \"Supplemental MTRC\") in Section 6.4 of the CRA. Under Section 6.3 \n4 \nand Schedule 5, LSPGC calculates a separate Annual MTRC for each Covered Upgrade \n5 \nover a twenty-year MTRC Term beginning on its applicable in-service date and ending \n6 \non the day immediately preceding the twentieth anniversary of that date, with partial Rate \n7 \nYears prorated. The Estimated Annual MTRC uses then-current estimated capital cost. \n8 \nWithin one year after the Covered Upgrade enters service, when actual capital cost is \n9 \nknown and all costs associated with its estimated capital cost have been accounted for, \n10 \nLSPGC establishes the Final Annual MTRC as the final incurred capital cost multiplied \n11 \nby the Project-Specific Levelized Fixed Charge Rate calculated under Schedule 5. \n12 \nSchedule 5 applies a fixed five-percent annual levelized-depreciation schedule over the \n13 \ntwenty-year MTRC Term to calculate present-worth federal and state income-tax \n14 \ndepreciation benefits; that schedule is not a separate annual MTRC charge. The allocation \n15 \nmethodology assigns each Large Load Customer a share of the upgrade costs, taking into \n16 \naccount other large loads and any portion serving other transmission system needs or \n17 \ncustomers. That allocation percentage is applied only once in calculating the customer’s \n18 \nAnnual MTRC. \n19 \nLSPGC separately calculates Qualifying Transmission Revenues (\"QTR\") under Section \n20 \n6.2 and Schedule 2. QTR consists of qualifying wholesale transmission revenues \n21 \nattributable to service to the Large Load Facility that reduce transmission revenues \n22 \notherwise collected from CAISO customers or directly credit LSPGC’s Net Revenue \n23 \nRequirement. Qualifying Transmission Revenues include the portion of TAC revenues \n24"},{"page":340,"startToken":122438,"endToken":122761,"text":"Page 11 \n \nattributable to the Large Load Facility and allocable to LSPGC, together with qualifying \n1 \nwheeling and other wholesale transmission revenues that reduce the amounts otherwise \n2 \ncollected from transmission customers. Each revenue amount is counted only once. The \n3 \nEligible Customer pays the greater of zero and the applicable Annual MTRC less QTR. \n4 \nUnder Section 6.5, LSPGC invoices forecast Supplemental MTRC, including any prior-\n5 \nperiod true-up adjustment, in monthly installments payable within thirty Calendar Days \n6 \nafter receipt. Upon initial finalization, the Final Annual MTRC applies back to the in-\n7 \nservice date, with estimated charges reconciled in the next Reconciliation Statement, \n8 \nprovided as Ex. LSC-102 to my testimony. QTR attributable to a specific Covered \n9 \nUpgrade is applied to that upgrade; other QTR is allocated among Covered Upgrades \n10 \nthen in their MTRC Terms pro rata based on their respective prorated Annual MTRCs for \n11 \nthe applicable period. If an upgrade enters service during a Rate Year without a projected \n12 \nSupplemental MTRC in the Annual Projection, LSPGC promptly forecasts and invoices \n13 \nthe prorated amount for the remainder of that year under Section 6.5. The Invoice \n14 \nStatement is provided as Ex. LSC-103 to my testimony. \n15 \nQ.  \nWHY WAS THE SUPPLEMENTAL MTRC DESIGNED IN THIS WAY? \n16 \nA.  \nThe Annual MTRC operates as a revenue floor, not an additive charge. Under Section \n17 \n6.6, LSPGC serves a Reconciliation Statement, provided as Ex. LSC-102 to my \n18 \ntestimony, concurrently with each Annual Update using actual QTR and the applicable \n19 \nAnnual MTRC. The reconciliation identifies billings, receipts, Applied Security \n20 \nProceeds, the updated Cumulative Revenue Ledger, Required Operational Security, and \n21 \nthe reconciliation of forecast TRBAA credits to amounts recorded in the Transmission \n22 \nRevenue Balancing Account (\"TRBA\"). It does not annually reopen final capital cost or \n23 \nFormula Rate inputs. The Final Annual MTRC may change only as permitted by Section \n24"},{"page":341,"startToken":122761,"endToken":123051,"text":"Page 12 \n \n6.3.1, including correction of error or fraud, effective prospective reassignment, a final \n1 \nFERC order applicable to the calculation, or prospective changes resulting from a final \n2 \nFERC order changing LSPGC’s Formula Rate return on equity or from subsequently \n3 \nenacted tax rates or tax law. Dispute determinations are implemented under Section 11.5. \n4 \nWhen a permitted recalculation is made under Section 6.3.1, LSPGC updates and serves \n5 \nthe MTRC Calculation Template on the Eligible Customer; the replacement template \n6 \nbecomes effective on service, subject to the Eligible Customer’s Article 11 dispute rights. \n7 \nThis design responds to Commissioner Chang’s concern about contributions untethered \n8 \nfrom the costs induced by individual large loads. The CRA ties the minimum contribution \n9 \nto the allocated capital cost and Schedule 5 inputs for identified Covered Upgrades while \n10 \nestablishing a defined twenty-year commitment. Annual reconciliation tests the revenue \n11 \nshortfall against that commitment rather than recalculating an annual Formula Rate-based \n12 \nupgrade revenue requirement. \n13 \nQ.  \nHOW DOES THE CRA ADDRESS STRANDED-ASSET RISK? \n14 \nA.  \nThe CRA addresses stranded-asset risk through a twenty-year revenue commitment, \n15 \nconstruction and operational security, and termination provisions that preserve the \n16 \nEligible Customer’s responsibility if the Large Load fails to materialize or departs the \n17 \nsystem. \n18 \nFirst, Section 6.7 establishes the Total Required Revenue Commitment for each Covered \n19 \nUpgrade as the Final Annual MTRC multiplied by twenty, subject to the adjustments \n20 \nspecified in that section. Before final determination, the projected commitment uses the \n21 \nEstimated Annual MTRC. The Remaining Cumulative Revenue Responsibility equals \n22 \nthat commitment less cumulative QTR, Supplemental MTRC Receipts, Applied Security \n23 \nProceeds, effective prospective reassignment credits, and cash amounts received and \n24"},{"page":342,"startToken":123051,"endToken":123343,"text":"Page 13 \n \napplied toward the Termination Fee, excluding any portion already counted as Applied \n1 \nSecurity Proceeds. Each dollar is counted only once. LSPGC updates an upgrade-specific \n2 \nCumulative Revenue Ledger at least annually and includes it with each Reconciliation \n3 \nStatement. When a final Reconciliation Statement determines that the remaining \n4 \nresponsibility is zero (“Break-Even”), operational payment and security obligations \n5 \nterminate. Once finally satisfied, the responsibility does not revive because of later \n6 \nchanges in Formula Rate inputs, subject to final true-ups and correction of errors or fraud \n7 \nfor periods before satisfaction. \n8 \nSecond, Sections 3.3.4 and 3.5 provide that cancellation, downsizing, curtailment, or \n9 \ncessation after an applicable in-service date does not itself eliminate payment or security \n10 \nobligations. Upon effective termination of the CRA or permanent cessation of service \n11 \nafter that date, the Eligible Customer owes a lump-sum Termination Fee equal to the \n12 \nRemaining Cumulative Revenue Responsibility for the in-service Covered Upgrades, less \n13 \nany Supplemental MTRC billed and unpaid as of the effective termination date, due thirty \n14 \nCalendar Days after LSPGC’s invoice. The excluded unpaid Supplemental MTRC \n15 \nremains separately payable and secured; its later payment, satisfaction through Applied \n16 \nSecurity Proceeds, or direct recovery reduces the Cumulative Revenue Responsibility. \n17 \nPayment in full discharges only the remaining contractual responsibility included in the \n18 \nfee, and no further Supplemental MTRC accrues for periods after the effective \n19 \ntermination or cessation date, subject to final reconciliation for earlier periods. LSPGC \n20 \nholds each Termination Fee, together with any Operational Security proceeds applied to \n21 \nit, in a separate interest-bearing Termination Fee Account. For each Covered Upgrade, \n22 \nthe Annual Termination Fee Credit for each remaining Rate Year equals the applicable \n23"},{"page":343,"startToken":123343,"endToken":123638,"text":"Page 14 \n \nAnnual MTRC, prorated for a partial Rate Year, but may not exceed the available \n1 \nTermination Fee Balance. In the final Rate Year of the MTRC Term, the credit includes \n2 \nthe entire remaining balance, including earnings, so the account is reduced to zero, \n3 \nsubject to release and adjustment if a prospective reassignment occurs. The uncredited \n4 \nbalance is separately accounted for as a deferred liability, is not included in rate base, and \n5 \nis not itself a TRBAA Credit. These credits do not reduce rate base. \n6 \nThird, Article 7 requires Construction Security for incurred and irrevocably committed \n7 \ncosts and Pre-In-Service Termination Costs, including applicable cancellation, \n8 \ndemobilization, and restoration costs and properly accrued allowance for funds used \n9 \nduring construction (\"AFUDC\"). Construction Security continues separately for upgrades \n10 \nnot yet in service. Operational Security must be delivered no later than thirty Calendar \n11 \nDays before the earliest expected applicable in-service date and be fully effective before \n12 \nservice. Under Section 7.3, it equals one hundred percent of the nominal Remaining \n13 \nCumulative Revenue Responsibility, reduced only by currently certified Qualifying \n14 \nRetail Security Support.  Security is recalculated at the events specified in Section 7.4, \n15 \nincluding annual projections and reconciliations, final MTRC determination, permitted \n16 \nrecalculations, reassignment, and credit review events. Security does not cap the Eligible \n17 \nCustomer’s underlying liability. For a LSPGC-owned CAISO-Assigned Regional Project, \n18 \nthe CRA does not independently impose pre-service Construction Security solely because \n19 \nCAISO has assigned a project share; any such requirement must arise under the \n20 \napplicable tariff, interconnection agreement, or other Commission-accepted arrangement. \n21 \nTogether, these provisions protect against stranded-asset exposure through an identified \n22 \nrevenue commitment and enforceable payment and security obligations. Sections 4.2 and \n23"},{"page":344,"startToken":123638,"endToken":123918,"text":"Page 15 \n \n6.3.6 also require separate affected-system and third-party regional-project arrangements \n1 \nand evidence of compliance. These provisions support the Show Cause Order’s objective \n2 \nof mitigating the risk of stranded assets if large loads prove speculative. \n3 \nQ.  \nHOW DOES THE CRA AVOID REDUNDANT FINANCIAL SECURITY \n4 \nREQUIREMENTS? \n5 \nA.  \nSection 7.1 recognizes Construction Security provided under an interconnection or \n6 \nengineering and procurement agreement for the same costs, avoiding duplication. Under \n7 \nArticle 7 and Schedule 3, a currently effective Retail Security Certification reduces direct \n8 \nOperational Security dollar-for-dollar by certified Qualifying Retail Security Support. \n9 \nThis does not reduce the underlying wholesale obligation and does not apply to \n10 \nConstruction Security or Pre-In-Service Termination Costs. The certification remains \n11 \neffective until superseded, withdrawn, or deemed ineffective; no annual recertification is \n12 \nrequired unless an update-triggering event occurs. Direct Security may be cash, a \n13 \nqualifying Letter of Credit, or another form accepted by LSPGC in its sole discretion. \n14 \nThere is no automatic unsecured allowance for an investment-grade utility. \n15 \nSection 6.10 allows transfer to a Successor Eligible Customer through an assumption \n16 \nagreement and required Security before the prior Eligible Customer is released. Section \n17 \n6.9 permits prospective reassignment to a subsequent large load at another facility only \n18 \nwhen an objective study demonstrates reliance on identifiable incremental upgrade \n19 \ncapability that avoids or reduces otherwise-needed upgrades. The reassignment is \n20 \nbounded by the avoided upgrade cost, capability-supported amount, and remaining \n21 \nallocated net plant. A reduction becomes effective only after the service, agreement, \n22 \nsecurity, and approval conditions are satisfied, and does not reopen prior years. A sale or \n23"},{"page":345,"startToken":123918,"endToken":124203,"text":"Page 16 \n \ntransfer of the same Large Load Facility is governed by Section 6.10 rather than the \n1 \nreassignment study process. \n2 \nQ.  \nHOW DOES THE CRA HELP ENSURE THAT PAYMENTS ARE \n3 \nAPPROPRIATELY CREDITED TO TRANSMISSION CUSTOMERS? \n4 \nA.  \nSection 6.8 establishes TRBAA Credits rather than Formula Rate revenue credits. In each \n5 \nannual TRBAA, LSPGC includes as a Forecast TRBAA Credit the projected \n6 \nSupplemental MTRC for the following Rate Year, increased or reduced by any prior-\n7 \nperiod true-up adjustment, plus any Annual Termination Fee Credit scheduled for that \n8 \nyear under Section 3.3.4.  Actual Supplemental MTRC Receipts and Applied Security \n9 \nProceeds are recorded in the TRBA when received or applied, except that proceeds \n10 \napplied to a Termination Fee are credited through the Termination Fee’s annual crediting \n11 \nschedule. Differences between the forecast credit and the applicable actual amounts flow \n12 \nthrough a subsequent TRBAA. The TRBA also reflects any adjustments necessary to \n13 \nprevent duplicate recovery of amounts collected under the CRA. Each dollar is counted \n14 \nonce; QTR is not credited again, and posting, drawing, or holding Security does not itself \n15 \nproduce a credit. LSPGC maintains supporting workpapers and includes sufficient \n16 \nworkpapers with each TRBAA filing to permit verification, subject to appropriate \n17 \nconfidentiality protections. \n18 \nThis mechanism provides transmission customers the benefit of the CRA’s payments \n19 \nwithout changing the Formula Rate calculation or recovering the same amount twice. \n20 \nInterest on the TRBA balance is governed by Section 5.3 of the TO Tariff. By contrast, \n21 \nSupplemental MTRC invoices, refunds, and prior-period adjustments between LSPGC \n22 \nand the Eligible Customer do not accrue interest under Section 6.6. \n23"},{"page":346,"startToken":124203,"endToken":124470,"text":"Page 17 \n \nVI. \nTARIFF IMPLEMENTATION AND REVIEW \n1 \nQ. \nPLEASE DESCRIBE THE ASSOCIATED TARIFF REVISIONS. \n2 \nA. \nThe pro forma CRA establishes the contractual revenue-support and security obligations \n3 \ncontemplated by Section 10.9 and 10A.6 of the TO Tariff. LSPGC also proposes to revise \n4 \nthe definition of the TRBAA and Section 5.3 so that amounts required to be credited \n5 \nunder a CRA flow through to transmission customers. The revisions provide for the \n6 \nforecast credits and the amounts recorded in the Transmission Revenue Balancing \n7 \nAccount (“TRBA”), with interest on the TRBA balance governed by Section 5.3. As Mr. \n8 \nArzola explains, no changes are required to the Formula Rate Template, the Protocols, or \n9 \nAppendix I of the TO Tariff. \n10 \nQ. \nHOW DOES THE CRA RELATE TO INTERCONNECTION AND AFFECTED \n11 \nSYSTEM OBLIGATIONS? \n12 \nA. \nThe CRA contemplates an Eligible Customer for Large Load (“ECLL”) or Transmission \n13 \nSystem Wholesale Load (“TSWL”) Interconnection Agreement. Under Section 12.3, the \n14 \napplicable interconnection agreement governs physical interconnection, design, \n15 \nengineering, procurement, construction, testing, energization, and operating \n16 \nrequirements, except to the extent the CRA expressly establishes or supplements \n17 \nconstruction-cost, pre-service termination-cost, revenue-support, or security obligations. \n18 \nSection 4.2 requires the Eligible Customer to enter into and maintain arrangements with \n19 \neach applicable Affected System Owner, including the required payment and security \n20 \nobligations, and to provide evidence of compliance before LSPGC undertakes the \n21 \nconstruction or material commitments specified in that section. Costs and security under \n22 \nthose arrangements are administered separately, as provided in the CRA. \n23"},{"page":347,"startToken":124470,"endToken":124761,"text":"Page 18 \n \nQ. \nWHY ARE NO CHANGES TO THE FORMULA RATE TEMPLATE OR \n1 \nPROTOCOLS NEEDED? \n2 \nA. \nLSPGC’s existing Attachment 1a – Project Plant Detail Worksheet reports plant \n3 \nseparately by project, and Attachment 1 – Project Revenue Requirement Worksheet \n4 \ncalculates each project’s revenue requirement using the applicable allocation factors. \n5 \nCovered Upgrades can be reported as separate projects on those worksheets. Attachment \n6 \n9 – Revenue Credit Detail, Line 18, “Less: Revenue Credits included in the TRBAA,” \n7 \nremoves any TRBAA Credits otherwise recorded in the revenue accounts included on \n8 \nAttachment 9. The full eligible cost of each Covered Upgrade therefore remains in the \n9 \nBase Transmission Revenue Requirement, while CRA credits flow through the TRBAA. \n10 \nThe existing Protocols govern the supporting documentation, information exchange, \n11 \nreview, challenge, and true-up of Formula Rate inputs, including Covered Upgrade plant \n12 \nand the amounts removed on Attachment 9, Line 18. CRA-related TRBAA Credits are \n13 \nalso supported and reviewed in LSPGC’s annual TRBAA filing under Section 205 of the \n14 \nFederal Power Act. Mr. Arzola describes those processes in Exhibit No. LSC-200. \n15 \nQ. \nHOW WILL THE PRO FORMA CRA AND INDIVIDUAL AGREEMENTS BE \n16 \nIMPLEMENTED? \n17 \nA. \nArticle 5 identifies the CRA as the form of agreement required under Section 10.9 and \n18 \n10A.6 of the TO Tariff as a condition of LSPGC’s design, procurement, construction, and \n19 \noperation of Large Load-Driven Upgrades. Once the pro forma is accepted, a \n20 \nconforming, executed CRA with populated Schedules generally will not require an \n21 \nindividual Section 205 filing. LSPGC must file unexecuted agreements, agreements \n22 \ncontaining material deviations, and any other agreement required by Commission rule or \n23 \norder. Schedule 5 contains the upgrade-specific MTRC calculation and Cumulative \n24"},{"page":348,"startToken":124761,"endToken":125077,"text":"Page 19 \n \nRevenue Ledger; it does not itself impose a separate FERC filing requirement. These \n1 \nprovisions do not eliminate LSPGC’s annual Section 205 filing of its TRBAA. \n2 \nQ. \nHOW ARE COVERED UPGRADES TREATED FOR PURPOSES OF RETURN \n3 \nON EQUITY, CAPITAL STRUCTURE, AND COST CONTAINMENT? \n4 \nA. \nAs Mr. Arzola explains, Covered Upgrades are subject to LSPGC’s Commission-\n5 \naccepted Formula Rate and the return on equity (“ROE”) and capital structure reflected in \n6 \nthe effective Formula Rate. The commitments to limit ROE to 9.8%, inclusive of \n7 \nincentive ROE adders, and the equity component of capital structure to 45% were made \n8 \nin connection with the competitive solicitations for the Gates and Round Mountain \n9 \nprojects and are reflected in the Approved Project Sponsor Agreements for those projects. \n10 \nLSPGC is not proposing to extend those project-specific commitments to Covered \n11 \nUpgrades. Covered Upgrade costs will be separately identified on Attachment 1a and \n12 \nexcluded from the cost containment worksheets in Attachments 11 and 12; they will not \n13 \nbe subject to the capital cost caps or annual revenue requirement caps applicable to \n14 \nLSPGC’s competitively selected projects. \n15 \nLSPGC is not requesting a different ROE, a different capital structure, or a new incentive \n16 \nROE adder in this proceeding. LSPGC retains the right, subject to applicable \n17 \nCommission requirements, to seek different treatment for Covered Upgrades in a future \n18 \nSection 205 filing. Unless and until the Commission authorizes different treatment, the \n19 \neffective Formula Rate governs. Any recalculation of a Final Annual MTRC remains \n20 \nsubject to the express limitations in CRA Section 6.3.1. \n21 \nQ.  \nHOW DOES THE CRA INTERACT WITH THE FORMULA RATE AND \n22 \nPROTOCOLS? \n23 \nA. \nUnder Sections 6.1 and 12.3, the Formula Rate and Protocols continue to govern the \n24 \ncalculation, information exchange, and true-up of LSPGC’s Net Revenue Requirement \n25"},{"page":349,"startToken":125077,"endToken":125373,"text":"Page 20 \n \nand the rate-base treatment of Covered Upgrades. LSPGC posts its Annual Projection by \n1 \nOctober 5 for the following Rate Year and its Annual Update by July 1 after each Rate \n2 \nYear. The CRA follows that calendar for forecasting and reconciling Supplemental \n3 \nMTRC. It preserves recovery of eligible upgrade costs through the Formula Rate and \n4 \ndoes not require the Eligible Customer to reimburse LSPGC directly for their capital \n5 \ncosts. Supplemental MTRC payments support the minimum revenue commitment and are \n6 \ncredited to transmission customers through the TRBAA. \n7 \nSchedule 5, rather than a new Formula Rate calculation, controls the Estimated Annual \n8 \nMTRC and Final Annual MTRC. The CRA controls Supplemental MTRC, the \n9 \nCumulative Revenue Responsibility, Operational Security, and prospective reassignment. \n10 \nWith each Annual Projection, Section 6.5 requires upgrade-specific workpapers showing \n11 \nthe Annual MTRC, forecast QTR, projected Supplemental MTRC, prior-period true-up \n12 \nadjustment, Forecast TRBAA Credit, Total Required Revenue Commitment, and \n13 \nRequired Operational Security. With each Annual Update, Sections 6.6 and 6.7 require \n14 \nservice of the Reconciliation Statement, updated Cumulative Revenue Ledger, \n15 \nrecalculated security, TRBA reconciliation, and supporting workpapers. \n16 \nSection 6.8 governs credits through the TRBAA, and Article 11 governs disputes arising \n17 \nunder the CRA. The Annual MTRC and related contractual obligations are administered \n18 \nunder the CRA separately from the Formula Rate calculation. \n19 \nQ.  \nHOW DOES THE CRA ADDRESS ANNUAL TRUE-UPS AND FINALITY? \n20 \nA.  \nSection 6.6 carries an under-billed or over-billed Supplemental MTRC amount into \n21 \nbilling following the next Annual Projection. If no further Supplemental MTRC will be \n22 \ninvoiced, LSPGC separately invoices an under-billed amount, payable within thirty \n23 \nCalendar Days after receipt, or refunds an over-billed amount within thirty Calendar \n24"},{"page":350,"startToken":125373,"endToken":125635,"text":"Page 21 \n \nDays after service of the Reconciliation Statement. These adjustments between the \n1 \nParties bear no interest. The Reconciliation Statement becomes final upon written \n2 \nacceptance or ninety Calendar Days after service, whichever occurs first, unless a timely \n3 \nNotice of Dispute identifies disputed items. Undisputed portions become final on the \n4 \notherwise applicable date; disputed items become final upon the applicable Dispute \n5 \nDetermination. \n6 \nUnder Section 11.5, LSPGC implements a final Dispute Determination by updating the \n7 \naffected calculations, Schedules, ledger, reconciliation, and Security, as applicable, and \n8 \ninvoicing or refunding amounts between the Parties within thirty Calendar Days, without \n9 \ninterest. Any resulting adjustment affecting amounts credited to or recovered from \n10 \ntransmission customers is recorded in the TRBA and flows through the TRBAA, with \n11 \ninterest on amounts returned to transmission customers as provided in Section 5.3 of the \n12 \nTO Tariff. \n13 \nQ.  \nHOW DOES THE CRA SUPPORT COST AND BILLING TRANSPARENCY? \n14 \nA. \nThe Annual Projection workpapers and annual Reconciliation Statement make the \n15 \nupgrade-specific minimum contribution, forecast and actual QTR, Supplemental MTRC, \n16 \ncumulative commitment, security, and TRBAA credit calculations available to the \n17 \nEligible Customer. Schedule 5 records the MTRC calculation and Cumulative Revenue \n18 \nLedger. Section 6.8 also requires workpapers with each TRBAA filing sufficient for \n19 \ntransmission customers to verify the credits, with aggregation or privileged treatment \n20 \navailable to protect customer-specific information. LSPGC’s annual TRBAA filing is \n21 \nsubject to Commission review and permits interested parties to intervene, comment, and \n22 \nprotest, as Mr. Arzola explains. \n23"},{"page":351,"startToken":125635,"endToken":125779,"text":"Page 22 \n \nSection 6.12 provides the Eligible Customer access, upon reasonable request, to the \n1 \ninformation needed to verify the identification of upgrades and the CRA’s calculations. \n2 \nArticle 11 provides informal resolution, alternative dispute resolution, and access to \n3 \nFERC. The Large Load Customer and any Successor Eligible Customer may participate \n4 \nto the extent a dispute affects its obligations under the CRA or Limited Acknowledgment. \n5 \nDisputes over CAISO’s regional project designation or assignment are resolved under the \n6 \napplicable CAISO Tariff procedures. \n7 \nThe CRA’s confidentiality provisions protect customer-specific information while \n8 \npreserving verification and dispute rights. These contractual records and the TRBAA \n9 \nfiling workpapers provide a basis to trace payments and credits and test whether the same \n10 \nobligation has been counted more than once. \n11 \nQ.  \nDOES THIS CONCLUDE YOUR TESTIMONY?  \n12 \nA.  \nYes, it does.\n13"},{"page":352,"startToken":125779,"endToken":125854,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \n \n \n \n \nLS Power Grid California, LLC \nCalifornia Independent System Operator Corporation \n) \n) \nDocket No. \nDocket No.  \nER27-___-000 \nEL26-71-___ \n \nVERIFICATION  \n \n \n \nI, Patrick Hayes, verify under penalty of perjury that I have read the testimony, know the \ncontents thereof, and that the facts and representations set forth therein are true to the best of my \nknowledge, information and belief. \n \n \n \n \n \n \n \n \n \n \n/s/ Patrick Hayes___________________________ \n \n \n \n \n \n \nPatrick Hayes \n \n \nDated: November 16, 2026"},{"page":353,"startToken":125854,"endToken":125859,"text":"Ex. LSC-101 \n \nMTRC Example (Excel)"},{"page":354,"startToken":125859,"endToken":125864,"text":"Ex. LSC-102 \n \nIllustrative Reconciliation Statement"},{"page":355,"startToken":125864,"endToken":126070,"text":"LSPGCA  |  Proposed unpopulated form  |  1 \nAnnual Reconciliation Statement \nPROPOSED UNPOPULATED FORM \nServe with the Annual Update. Complete by Covered Upgrade and attach customer totals and workpapers. Amounts are dollars; positive customer adjustments are charges and \nnegative adjustments are credits. \nStatement information \nEntry \nEligible Customer \n[ ] \nLarge Load Facility \n[ ] \nCRA identifier \n[ ] \nCovered Upgrade \n[ ] \nRate Year \n[ ] \nStatement identifier \n[ ] \nStatement date \n[ ] \nStatement service date \n[ ] \n \n1 Annual obligation and customer true up \nLine \nComponent \nForecast \nActual \n1 \nApplicable Annual MTRC after proration \n[ ] \n[ ] \n2 \nQualifying Transmission Revenues \n[ ] \n[ ] \n3 \nSupplemental MTRC \nmax(1 − 2, 0) \nmax(1 − 2, 0) \n \nLine \nComponent \nAmount or calculation \n4 \nTotal Supplemental MTRC billed during the Rate Year \n[ ] \n5 \nPrior-period adjustments included in line 4 \n[Signed amount as billed] \n6 \nCurrent-year Supplemental MTRC billed \nLine 4 − line 5 \n7 \nCustomer true-up to carry forward or settle \nLine 3 actual − line 6 \n8 \nPortion of line 7 already billed or refunded separately \n[Signed amount; identify transaction] \n9 \nUnimplemented customer adjustment \nLine 7 − line 8 \n \nImplementation information \nEntry \nAnnual MTRC status \n[Estimated / Final / permitted recalculation] \nFinal MTRC Determination Date \n[Date or not yet established] \nActual in-service date \n[ ] \nMTRC Term End Date \n[Day before twentieth anniversary of in-service] \nSchedule 5 calculation reference \n[ ] \nAdjustment billing Rate Year \n[ ] \nNext invoice or refund reference \n[ ]"},{"page":356,"startToken":126070,"endToken":126312,"text":"LSPGCA  |  Proposed unpopulated form  |  2 \n2 Collections and cumulative revenue ledger \nUse amounts actually received or applied. Identify their source Rate Years in supporting records. An invoice or Forecast TRBAA Credit does not by itself satisfy the commitment. \nLine \nComponent \nAmount or calculation \n10 \nOpening unpaid Supplemental MTRC billed balance \n[ ] \n11 \nNew Supplemental MTRC billed during the period \nLine 4 \n12 \nCustomer payments applied to those billed obligations \n[Exclude Applied Security Proceeds] \n13 \nOperational Security proceeds applied to those obligations \n[ ] \n14 \nOther billing adjustments or reversals \n[Signed amount; explain] \n15 \nClosing unpaid billed balance \nLines 10 + 11 − 12 − 13 + 14 \n16 \nClosing balance per billing records \n[ ] \n17 \nBilling balance check \nLine 15 − line 16 = 0 \n \n3 Remaining cumulative responsibility \nLine \nComponent \nAmount or calculation \n18 \nOpening Remaining Cumulative Revenue Responsibility \n[ ] \n19 \nPermitted commitment changes excluding reassignment \n[Signed amount; identify authority] \n20 \nQualifying Transmission Revenues credited this period \n[Reconcile to line 2 actual and prior-year adjustments] \n21 \nSupplemental MTRC Receipts credited this period \n[Exclude Applied Security Proceeds and Termination Fee] \n22 \nApplied Security Proceeds credited this period \n[Count each dollar once] \n23 \nEffective prospective reassignment credit \n[ ] \n24 \nTermination Fee recognized upon receipt in full \n[Exclude amounts already in line 22] \n25 \nReversals of prior credits or other ledger adjustments \n[Signed amount; explain] \n26 \nClosing Remaining Cumulative Revenue Responsibility \nmax(18 + 19 − 20 − 21 − 22 − 23 − 24 + 25, 0) \n27 \nClosing responsibility per cumulative ledger \n[ ] \n28 \nCumulative ledger check \nLine 26 − line 27 = 0"},{"page":357,"startToken":126312,"endToken":126535,"text":"LSPGCA  |  Proposed unpopulated form  |  3 \n4 Operational security \nLine \nComponent \nAmount or calculation \n29 \nClosing nominal remaining responsibility \nLine 26 \n30 \nCurrently certified Qualifying Retail Security Support \n[ ] \n31 \nRequired direct Operational Security \nmax(line 29 − line 30, 0) \n32 \nEligible direct Operational Security available to LSPGCA \n[Cash and qualifying instruments; exclude retail support] \n33 \nSecurity deficiency or potential excess \nLine 31 − line 32 \n \n \n5 TRBA and TRBAA reconciliation \nLine \nComponent \nAmount or calculation \n34 \nForecast TRBAA Credit for the applicable Rate Year \n[Include billed prior-period adjustments] \n35 \nSupplemental MTRC Receipts recorded in TRBA \n[ ] \n36 \nApplied Security Proceeds recorded in TRBA \n[Exclude amounts counted on another line] \n37 \nTermination Fee recorded in TRBA \n[Exclude amounts already in line 36] \n38 \nDuplicate-recovery credits recorded in TRBA \n[§3.3.3(d) / §6.3.5, if applicable] \n39 \nRefunds or reversals reducing recorded credits \n[ ] \n40 \nNet actual amounts recorded in TRBA \nLines 35 + 36 + 37 + 38 − 39 \n41 \nActual credit less forecast credit \nLine 40 − line 34 \n42 \nTRBA workpaper difference on the same sign basis \n[ ] \n43 \nTRBA reconciliation check \nLine 41 − line 42 = 0 \n \n \n6 Service and finality \nControl \nEntry \nPrepared by \n[ ] \nReviewed by \n[ ] \nCustomer service reference \n[ ] \n90 Calendar Day dispute deadline from service \n[ ] \nWritten acceptance date if earlier \n[ ] \nDisputed items and Notice of Dispute reference \n[None or attachment] \nFinal status \n[Pending / partial / final] \nFinality date \n[ ]"},{"page":358,"startToken":126535,"endToken":126540,"text":"Ex. LSC-103 \n \nIllustrative Invoice Statement"},{"page":359,"startToken":126540,"endToken":126770,"text":"LSPGCA  |  Proposed unpopulated form  |  1 \nLarge Load Invoice Statement \nPROPOSED UNPOPULATED FORM \nLSPGCA invoices the Eligible Customer directly. Complete one upgrade calculation and attach supporting workpapers. Amounts are in dollars; positive adjustments are charges \nand negative adjustments are credits. \nStatement information \nEntry \nEligible Customer \n[ ] \nLarge Load Facility \n[ ] \nCRA identifier \n[ ] \nCovered Upgrade \n[ ] \nRate Year \n[ ] \nStatement identifier \n[ ] \nStatement date \n[ ] \nStatement service date \n[ ] \nInvoice receipt date \n[ ] \nPayment due date \n[30 Calendar Days after receipt; confirm charge provision] \n \n1 Projected Supplemental MTRC \nLine \nComponent \nAmount or calculation \n1 \nApplicable projected Annual MTRC after proration \n[ ] \n2 \nProjected Qualifying Transmission Revenues \n[ ] \n3 \nProjected Supplemental MTRC before adjustments \nmax(line 1 − line 2, 0) \n4 \nPrior-period true-up adjustment allocated to this Rate Year \n[Signed amount; zero if none] \n5 \nSupplemental MTRC scheduled for this Rate Year \nLine 3 + line 4 \n6 \nNumber of scheduled monthly installments \n[12 for full year; actual count for partial year] \n7 \nScheduled monthly installment \nLine 5 ÷ line 6 \n \n2 Current invoice \nLine \nComponent \nAmount or calculation \n8 \nCurrent billing period \n[Month and year] \n9 \nSupplemental MTRC installment for this period \n[From line 7; identify any rounding adjustment] \n10 \nOther incremental charge or credit on page 2 \nLine 17 \n11 \nPayments already applied to lines 9 and 10 \n[Exclude Applied Security Proceeds] \n12 \nOperational Security proceeds already applied to lines 9 and 10 \n[ ] \n13 \nNet current invoice amount \nLines 9 + 10 − 11 − 12"},{"page":360,"startToken":126770,"endToken":126967,"text":"LSPGCA  |  Proposed unpopulated form  |  2 \n3 Other incremental charge or credit \nComplete for each additional item and attach a charge detail if more than one item applies. Use only the net amount not already billed or satisfied; carry the aggregate to line 10. \nLine \nComponent \nAmount or calculation \n14 \nCharge type \n[True-up / Termination Fee / other authorized item] \n15 \nGross amount of this item \n[ ] \n16a \nLess amount of this same item previously billed \n[ ] \n16b \nLess previously unbilled amount already paid \n[ ] \n16c \nLess previously unbilled amount satisfied by security \n[Exclude any amount already included in 16b] \n17 \nNet incremental charge or credit \nLine 15 − lines 16a − 16b − 16c \n \nSupporting information \nEntry \nAuthorizing CRA provision \n[ ] \nSource Rate Year \n[ ] \nReconciliation Statement identifier \n[ ] \nSource adjustment amount \n[Signed amount] \nPortion of adjustment previously billed or refunded \n[ ] \nSupporting calculation reference \n[ ] \nTermination or cessation date if applicable \n[ ] \nUpdated cumulative ledger reference if applicable \n[ ] \n \n \n4 Corrections and payment instructions \nControl \nEntry \nSuperseded invoice identifier \n[Original or prior invoice ID] \nReason for correction \n[ ] \nPreviously invoiced amount \n[ ] \nCorrection to previously billed amount \n[Signed amount; identify affected invoices] \nPayment instructions \n[Verified remittance instructions or attachment] \nLSPGCA contact \n[Name and contact details] \nPrepared by \n[ ] \nReviewed by \n[ ] \nDelivery recipient \n[ ] \nDelivery reference \n[ ]"},{"page":361,"startToken":126967,"endToken":126981,"text":"Attachment 4 \n \nDirect Testimony of D. Eric Arzola (Exhibit No. LSC-200) and \nSupporting Exhibits"},{"page":362,"startToken":126981,"endToken":127030,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nLS Power Grid California, LLC \nCalifornia Independent System Operator Corporation \n) \n) \nDocket No. \nDocket No. \nER27-___-000 \nEL26-71-___ \n \n \n \nDIRECT TESTIMONY  \nOF  \nD. ERIC ARZOLA \n \nON BEHALF OF \nLS POWER GRID CALIFORNIA, LLC \n \n \n \n \nLarge Load Network Upgrade Cost Recovery \n \n \n \nNovember 2026"},{"page":363,"startToken":127030,"endToken":127083,"text":"TABLE OF CONTENTS \n \nI. \nINTRODUCTION AND EXPERIENCE ........................................................................... 1 \nII. \nPURPOSE AND SUMMARY OF TESTIMONY ............................................................. 2 \nIII. LSPGC AND FORMULA RATE BACKGROUND ......................................................... 3 \nIV. THE LARGE LOAD COST RECOVERY FRAMEWORK.............................................. 5 \nV. \nCREDITING CRA AMOUNTS TO CUSTOMERS THROUGH THE TRBAA ............ 10 \nVI. LSPGC’S FORMULA RATE TEMPLATE ..................................................................... 14 \nVII. \nILLUSTRATIVE EXHIBITS ....................................................................................... 16 \nVIII. \nCONCLUSION ............................................................................................................. 18"},{"page":364,"startToken":127083,"endToken":127103,"text":"EXHIBITS TO \nDIRECT TESTIMONY OF D. ERIC ARZOLA \n \nExhibit No. \nDescription \nLSC-201: \nIllustrative Formula Rate Template \nLSC-202: \nIllustrative TRBAA Calculation"},{"page":365,"startToken":127103,"endToken":127336,"text":"DIRECT TESTIMONY OF  \n \nD. ERIC ARZOLA \n \n \nI. \nINTRODUCTION AND EXPERIENCE \n1 \nQ. \nPLEASE STATE YOUR NAME AND BUSINESS ADDRESS. \n2 \nA. \nMy name is D. Eric Arzola. My business address is 16150 Main Circle Drive, Suite 310, \n3 \nChesterfield, Missouri 63017. \n4 \nQ. \nWITH WHAT ENTITY ARE YOU EMPLOYED? \n5 \nA. \nI am employed as the Director of Transmission Rates at LS Power Development, LLC \n6 \n(“LS Power Development”), the general partner and manager of LS Power Associates, \n7 \nL.P. (“LS Power”), which is an affiliate of LS Power Grid California, LLC (“LSPGC” or \n8 \n“Company”). \n9 \nQ. \nON WHOSE BEHALF ARE YOU TESTIFYING IN THIS PROCEEDING? \n10 \nA. \nI am testifying on behalf of LSPGC. \n11 \nQ. \nHAVE YOU PREVIOUSLY FILED TESTIMONY BEFORE A REGULATORY \n12 \nCOMMISSION? \n13 \nA. \nYes. I have submitted testimony in Federal Energy Regulatory Commission (“FERC” or \n14 \n“Commission”) Docket Nos. ER22-221, ER23-206, ER24-264, ER24-2668, ER25-321, \n15 \nER25-2025, ER26-69, ER26-140, ER26-315, ER27-165, and ER27-482. \n16 \nQ. \nPLEASE DESCRIBE YOUR EDUCATIONAL BACKGROUND AND \n17 \nPROFESSIONAL EXPERIENCE. \n18 \nA. \nI have a Bachelor of Arts degree in Economics from Rice University in Houston, Texas, \n19 \nand a Graduate Certificate in Energy Policy and Management from Portland State \n20 \nUniversity in Portland, Oregon. I have over 22 years of experience in the energy industry, \n21 \nwith over 12 years focused on transmission cost of service rates, regulation, and strategy. \n22"},{"page":366,"startToken":127336,"endToken":127630,"text":"2 \n \nI have been employed by LS Power Development since 2020, where I am responsible for \n1 \noverseeing transmission rates for LS Power’s FERC-jurisdictional entities. Prior to \n2 \njoining LS Power, I held positions with similar responsibilities at GridLiance LLC and \n3 \nPacifiCorp. \n4 \nII. \nPURPOSE AND SUMMARY OF TESTIMONY \n5 \nQ. \nWHAT IS THE PURPOSE OF YOUR TESTIMONY? \n6 \nA. \nThe purpose of my testimony is to explain how LSPGC will recover the cost of \n7 \ntransmission facilities built to serve large loads and covered by a Large Load Cost \n8 \nRecovery Agreement (“CRA”) (such facilities, “Covered Upgrades”), and how it will \n9 \ncredit the amounts Eligible Customers pay under their CRAs to transmission customers. \n10 \nThe proposal responds to the Commission’s June 18, 2026, order in Docket No. EL26-\n11 \n71-000 (“Show Cause Order”). Specifically, my testimony (i) describes the large load \n12 \ncost recovery framework; (ii) explains how the amounts LSPGC receives under its CRAs \n13 \nwill be credited to customers through LSPGC’s Transmission Revenue Balancing \n14 \nAccount Adjustment (“TRBAA”), and the related revisions to LSPGC’s Transmission \n15 \nOwner Tariff (“TO Tariff”); (iii) explains why no changes are needed to LSPGC’s \n16 \nFormula Rate Template, its Formula Rate Implementation Protocols, or Appendix I of the \n17 \nTO Tariff; (iv) describes the exhibits I sponsor, which are two illustrative examples; and \n18 \n(v) explains why the proposal is just and reasonable. The pro forma CRA, including how \n19 \neach Eligible Customer’s annual Minimum Transmission Revenue Contribution is \n20 \nestablished, is sponsored by LSPGC witness Mr. Hayes. \n21 \nQ. \nPLEASE SUMMARIZE THE PROPOSAL. \n22 \nA. \nLSPGC proposes to credit the amounts it receives under its CRAs to transmission \n23 \ncustomers through its TRBAA, the existing mechanism LSPGC uses to pass revenue that \n24"},{"page":367,"startToken":127630,"endToken":127916,"text":"3 \n \nit does not receive through the California Independent System Operator Corporation \n1 \n(“CAISO”) Transmission Access Charge (“TAC”) back to customers. To implement this \n2 \nproposal, LSPGC proposes to revise the definition of the TRBAA and Section 5.3 of the \n3 \nTO Tariff so that the TRBAA also flows through to transmission customers the amounts \n4 \na CRA requires to be credited through it, including TRBAA Credits that LSPGC receives \n5 \ndirectly from or on behalf of an Eligible Customer. No changes to LSPGC’s Formula \n6 \nRate Template or Formula Rate Implementation Protocols are needed. \n7 \nQ. \nDOES THE PROPOSAL CHANGE HOW LSPGC’S REVENUE REQUIREMENT \n8 \nIS CALCULATED? \n9 \nA. \nNo. LSPGC’s Formula Rate is unchanged. Covered Upgrades are included in LSPGC’s \n10 \nrate base and revenue requirement in the same manner as any other LSPGC transmission \n11 \nplant, and are reported as separate projects on the existing Attachment 1a – Project Plant \n12 \nDetail Worksheet and Attachment 1 – Project Revenue Requirement Worksheet. The \n13 \nexisting Attachment 9, Line 18, “Less: Revenue Credits included in the TRBAA,” \n14 \nensures that TRBAA Credits are credited only once. Entry into a CRA and receipt of \n15 \namounts under it will not require any modification of the Formula Rate. \n16 \nQ. \nOTHER THAN YOUR TESTIMONY, ARE YOU SPONSORING ANY \n17 \nEXHIBITS? \n18 \nA. \nYes. I am sponsoring the following exhibits: \n19 \nExhibit No. \nDescription \nLSC-201: \nIllustrative Formula Rate Template \nLSC-202: \nIllustrative TRBAA Calculation \nIII. \nLSPGC AND FORMULA RATE BACKGROUND \n20 \nQ. \nPLEASE PROVIDE AN OVERVIEW OF LSPGC AND ITS FORMULA RATE. \n21 \nA. \nLSPGC is a transmission-only Participating Transmission Owner in the CAISO. LSPGC \n22 \nowns the Gates and Round Mountain projects, which the CAISO selected LSPGC to \n23"},{"page":368,"startToken":127916,"endToken":128216,"text":"4 \n \ndevelop through its competitive solicitation process, and is developing additional \n1 \ncompetitively selected projects. LSPGC’s formula rate consists of its Formula Rate \n2 \nTemplate (Appendix III of the TO Tariff) and its Formula Rate Implementation Protocols \n3 \n(Appendix IV of the TO Tariff) (together, the “Formula Rate”), which were originally \n4 \naccepted by the Commission in Docket No. ER21-195 and most recently revised in \n5 \nDocket No. ER26-2665. LSPGC’s revenue requirement is recovered through the CAISO \n6 \nTAC. \n7 \nQ. \nHOW DOES THE FORMULA RATE OPERATE EACH YEAR? \n8 \nA. \nBy October 5, LSPGC posts an Annual Projection of its net revenue requirement for the \n9 \nupcoming Rate Year. By July 1 after each Rate Year, LSPGC posts an Annual Update \n10 \nusing actual FERC Form No. 1 or other Company data. The difference between the \n11 \nprojected and actual net revenue requirement, with interest, is the True-Up Adjustment, \n12 \nwhich is included in a later Annual Projection. \n13 \nQ. \nHOW IS LSPGC’S TRANSMISSION REVENUE REQUIREMENT \n14 \nDETERMINED? \n15 \nA. \nAs provided in Appendix I of the TO Tariff, LSPGC’s Transmission Revenue \n16 \nRequirement (“TRR”) is the sum of its Base Transmission Revenue Requirement (“Base \n17 \nTRR”), determined under the Formula Rate, and its TRBAA. LSPGC files to update its \n18 \nTRBAA each October, effective January 1. Under Section 5.3 of the TO Tariff, the \n19 \nTRBAA equals the principal balance in LSPGC’s Transmission Revenue Balancing \n20 \nAccount (“TRBA”) as of September 30 (“Cr”), plus a forecast of Transmission Revenue \n21 \nCredits for the following calendar year (“Cf”), plus the interest balance for the TRBA \n22 \n(“I”). The TRBA compares LSPGC’s Base TRR to the amounts it actually receives, so \n23 \nthat LSPGC collects no more and no less than its Base TRR. LSPGC already uses the \n24"},{"page":369,"startToken":128216,"endToken":128523,"text":"5 \n \nTRBAA to credit customers with revenue it receives outside the TAC, such as Generator \n1 \nInterconnection Process Forfeited Deposit Allocations. \n2 \nQ. \nWHY IS LSPGC MAKING THIS FILING? \n3 \nA. \nIn the Show Cause Order, the Commission directed the CAISO and its transmission \n4 \nowners to show cause why their tariffs remain just and reasonable or to propose changes \n5 \nfor integrating large loads. Among other things, the Commission called for a mechanism \n6 \nto ensure that large load payments are “credited toward transmission owners’ \n7 \ntransmission revenue requirements.” LSPGC’s TO Tariff limits Transmission Revenue \n8 \nCredits to proceeds received from the CAISO, so its TRBAA does not currently provide \n9 \nfor amounts LSPGC receives directly from or on behalf of an Eligible Customer. The \n10 \nrevisions I describe provide the mechanism the Commission called for. \n11 \nIV. \nTHE LARGE LOAD COST RECOVERY FRAMEWORK \n12 \nQ. \nWHAT IS A CRA? \n13 \nA. \nA CRA is an agreement between LSPGC and an Eligible Customer taking transmission \n14 \nservice on behalf of a large load. Under its CRA, the Eligible Customer commits to an \n15 \nannual Minimum Transmission Revenue Contribution (“Annual MTRC”) for each \n16 \nCovered Upgrade built to serve the large load, for a fixed twenty-year term beginning on \n17 \nthe applicable in-service date, with partial Rate Years prorated as provided in the CRA. \n18 \nThe pro forma CRA is set forth in Appendix V of the TO Tariff. The Annual MTRC is \n19 \ncalculated solely under the MTRC Calculation Template in Schedule 5 of the CRA and is \n20 \nnot an input to, or a calculation made under, the Formula Rate. The terms of the pro \n21 \nforma CRA, including how the Annual MTRC is established, termination, and credit \n22 \nsupport requirements, are described in the transmittal letter and the testimony of Mr. \n23 \nHayes. \n24"},{"page":370,"startToken":128523,"endToken":128817,"text":"6 \n \nQ. \nHOW ARE THE COSTS OF COVERED UPGRADES RECOVERED? \n1 \nA. \nEach Covered Upgrade placed under the CAISO’s Operational Control is included in \n2 \nLSPGC’s rate base and Base TRR and recovered through the CAISO TAC together with \n3 \nthe cost of LSPGC’s other transmission facilities. The Eligible Customer pays the TAC \n4 \nfor the service it takes, like any other transmission customer. The portion of those TAC \n5 \npayments allocable to LSPGC, determined under Schedule 2 of the CRA, counts toward \n6 \nthe Eligible Customer’s Annual MTRC as “Qualifying Transmission Revenues.” Under \n7 \nSection 6.2, Qualifying Transmission Revenues also include qualifying wheeling and \n8 \nother wholesale transmission revenues attributable to service to the Large Load Facility, \n9 \nto the extent they reduce transmission revenues otherwise collected from CAISO \n10 \ncustomers or directly credit LSPGC’s Net Revenue Requirement, without duplicate \n11 \nrecognition. \n12 \nQ. \nWHAT IS THE SUPPLEMENTAL MTRC? \n13 \nA. \nThe Supplemental MTRC is calculated separately for each Covered Upgrade as the \n14 \namount, if any, by which the applicable Annual MTRC, prorated for a partial Rate Year, \n15 \nexceeds the Qualifying Transmission Revenues allocated to that upgrade under Section \n16 \n6.4. It ensures that the Eligible Customer pays at least its committed Annual MTRC each \n17 \nyear, even if its load develops more slowly than expected. The Supplemental MTRC is \n18 \nnever less than zero. \n19 \nQ. \nHOW IS THE SUPPLEMENTAL MTRC BILLED AND RECONCILED? \n20 \nA. \nThe Supplemental MTRC follows the same calendar as the Formula Rate. With each \n21 \nAnnual Projection, LSPGC forecasts the Eligible Customer’s Qualifying Transmission \n22 \nRevenues and resulting Supplemental MTRC for the Rate Year and invoices that amount, \n23 \nincreased or reduced by any prior-period true-up adjustment, to the Eligible Customer in \n24"},{"page":371,"startToken":128817,"endToken":129115,"text":"7 \n \nequal monthly installments. In connection with each Annual Update, LSPGC determines \n1 \nthe actual Supplemental MTRC using actual Qualifying Transmission Revenues and \n2 \nserves the Eligible Customer a Reconciliation Statement. The difference between the \n3 \nSupplemental MTRC billed for a Rate Year, excluding any prior-period true-up \n4 \nadjustment included in that billing, and the actual Supplemental MTRC for that Rate \n5 \nYear is a prior-period true-up adjustment, which increases or reduces the Supplemental \n6 \nMTRC invoiced following the next Annual Projection. The adjustment is invoiced or \n7 \nrefunded separately only if no further Supplemental MTRC will be invoiced. No interest \n8 \naccrues on the Supplemental MTRC or on any prior-period true-up adjustment between \n9 \nLSPGC and the Eligible Customer. \n10 \nQ. \nWHAT HAPPENS IF AN ELIGIBLE CUSTOMER DOES NOT PAY OR \n11 \nTERMINATES ITS CRA? \n12 \nA. \nIf an Eligible Customer does not pay, LSPGC may draw on the Eligible Customer’s \n13 \nOperational Security and apply the proceeds to the unpaid amount (“Applied Security \n14 \nProceeds”). Upon effective termination of the CRA or permanent cessation of service by \n15 \nthe Large Load Facility after the applicable in-service date, the Eligible Customer pays a \n16 \nlump-sum Termination Fee equal to the Remaining Cumulative Revenue Responsibility \n17 \nfor each in-service Covered Upgrade, less any Supplemental MTRC billed and unpaid as \n18 \nof the effective termination or cessation date. The excluded unpaid amounts remain \n19 \nseparately payable and secured; their later payment, satisfaction through Applied Security \n20 \nProceeds, or direct recovery reduces the Cumulative Revenue Responsibility. Full \n21 \npayment of the Termination Fee discharges only the responsibility included in that fee, as \n22 \nprovided in Section 3.3.4. LSPGC will hold the Termination Fee in a separately \n23 \nidentified, interest-bearing Termination Fee Account for each Covered Upgrade and \n24"},{"page":372,"startToken":129115,"endToken":129403,"text":"8 \n \ncredit the balance, including earnings, to transmission customers through the TRBAA in \n1 \nannual amounts equal to the Annual MTRC (“Annual Termination Fee Credits”), for the \n2 \nRate Years remaining in the applicable MTRC Term, prorated for partial Rate Years, \n3 \nwith each year’s credit limited to the available balance and the final year’s credit \n4 \nincluding any remaining balance, including earnings, so that the account is reduced to \n5 \nzero, subject to the prospective reassignment and release provisions of Section 3.3.4. The \n6 \nuncredited Termination Fee Balance is separately accounted for as a deferred liability and \n7 \nis not itself a TRBAA Credit or Formula Rate input. The Covered Upgrade remains in \n8 \nrate base. The terms governing security and termination are described in the testimony of \n9 \nMr. Hayes. \n10 \nQ. \nWHAT ARE TRBAA CREDITS? \n11 \nA. \nThe CRA uses the term “TRBAA Credits” for the Forecast TRBAA Credit and the \n12 \namounts LSPGC records in the TRBA and credits to transmission customers through the \n13 \nTRBAA: payments of Supplemental MTRC received from or on behalf of the Eligible \n14 \nCustomer (“Supplemental MTRC Receipts”), Applied Security Proceeds, Annual \n15 \nTermination Fee Credits, and any credit required to prevent LSPGC from recovering the \n16 \nsame cost twice. The projected Supplemental MTRC, increased or reduced by any prior-\n17 \nperiod true-up adjustment, together with any Annual Termination Fee Credit scheduled \n18 \nfor the following year, included in the TRBAA is the “Forecast TRBAA Credit.” \n19 \nConsistent with the CRA, TRBAA Credits are credited solely through the TRBAA and \n20 \nare not inputs to the Formula Rate. Qualifying Transmission Revenues are not TRBAA \n21 \nCredits because they are already reflected in calculating the Supplemental MTRC. \n22"},{"page":373,"startToken":129403,"endToken":129684,"text":"9 \n \nQ. \nHOW ARE COVERED UPGRADES TREATED FOR PURPOSES OF RETURN \n1 \nON EQUITY, CAPITAL STRUCTURE, AND COST CONTAINMENT? \n2 \nA. \nCovered Upgrades will be subject to LSPGC’s Commission-accepted Formula Rate and \n3 \nthe return on equity (“ROE”) and capital structure reflected in the effective Formula Rate. \n4 \nLSPGC’s commitments to limit its ROE to 9.8%, inclusive of incentive ROE adders, and \n5 \nto limit the equity component of its capital structure to 45% were made in connection \n6 \nwith the competitive solicitations for the Gates and Round Mountain projects and are \n7 \nreflected in the Approved Project Sponsor Agreements for those projects. LSPGC is not \n8 \nproposing in this proceeding to extend those project-specific competitive commitments to \n9 \nCovered Upgrades. \n10 \nCovered Upgrade costs will be separately identified on Attachment 1a and will not be \n11 \nincluded in the cost containment worksheets LSPGC provides under Sections 1.c and \n12 \n3.d(vi) of the Formula Rate Implementation Protocols (Attachments 11 and 12 of the \n13 \nFormula Rate Template). Those costs will not be subject to the capital cost caps or annual \n14 \nrevenue requirement caps applicable to LSPGC’s competitively selected projects. \n15 \nLSPGC is not requesting a different ROE, a different capital structure, or any new \n16 \nincentive ROE adder in this proceeding. LSPGC retains the right, subject to applicable \n17 \nCommission requirements, to seek a different ROE, capital structure, or incentive \n18 \ntreatment for Covered Upgrades in a future filing under Section 205 of the Federal Power \n19 \nAct. Unless and until the Commission authorizes different treatment, the ROE, capital \n20 \nstructure, and any applicable incentive treatment reflected in the effective Formula Rate \n21 \nwill govern. \n22"},{"page":374,"startToken":129684,"endToken":130008,"text":"10 \n \nV. \nCREDITING CRA AMOUNTS TO CUSTOMERS THROUGH THE TRBAA \n1 \nQ. \nHOW WILL LSPGC CREDIT TRBAA CREDITS TO CUSTOMERS? \n2 \nA. \nThrough the TRBAA. Each October, LSPGC will include the Forecast TRBAA Credit \n3 \nfor the following calendar year in Cf. Under the CRA, the Forecast TRBAA Credit equals \n4 \nthe projected Supplemental MTRC, increased or reduced by any prior-period true-up \n5 \nadjustment, which is the same amount LSPGC will invoice the Eligible Customer, plus \n6 \nany Annual Termination Fee Credit scheduled for that year under Section 3.3.4. The \n7 \nForecast TRBAA Credit lowers the TRR effective January 1 and, through the TAC, the \n8 \ntransmission charges paid by all customers. During the year, the CAISO pays LSPGC the \n9 \nlower TRR, and the Eligible Customer pays the Supplemental MTRC directly to LSPGC. \n10 \nThe TRBA records both. For these CRA amounts, a TRBA difference arises when the \n11 \namounts LSPGC records in the TRBA differ from the corresponding credits reflected in \n12 \nCAISO payments, for example because of late payment or non-payment, the application \n13 \nof security, a termination, or the timing of monthly installments. Any such difference is \n14 \nincluded in the September 30 TRBA balance and returned to, or recovered from, \n15 \ncustomers through Cr in the following TRBAA. Amounts later refunded or reversed, and \n16 \nadjustments resulting from the resolution of a dispute under the CRA, are also recorded \n17 \nin the TRBA. \n18 \nQ. \nWHY IS THE TRBAA THE APPROPRIATE MECHANISM? \n19 \nA. \nThere are several reasons. First, the TRBAA already exists to credit customers with \n20 \nrevenue LSPGC receives outside the TAC, and the Commission and stakeholders review \n21 \nit each year. Second, because the Supplemental MTRC is invoiced on a forecast basis, \n22 \nincluding the Forecast TRBAA Credit in Cf gives customers the credit in the TRR \n23 \neffective January 1, rather than a year later. Third, the TRBA ensures LSPGC collects no \n24"},{"page":375,"startToken":130008,"endToken":130318,"text":"11 \n \nmore and no less than its Base TRR, so LSPGC retains none of the TRBAA Credits. \n1 \nFourth, crediting the revenue through the TRBAA keeps the full cost of each Covered \n2 \nUpgrade in the Base TRR, consistent with the CAISO’s requirement that facilities under \n3 \nits Operational Control be included in the TRR, while the TRBAA shows the credit \n4 \ntransparently and separately. \n5 \nQ. \nDOES USING THE TRBAA LIMIT THE ABILITY OF CUSTOMERS AND \n6 \nOTHER INTERESTED PARTIES TO REVIEW OR CHALLENGE THESE \n7 \nCREDITS? \n8 \nA. \nNo. LSPGC’s annual TRBAA filing is made under Section 205 of the Federal Power Act. \n9 \nEach filing is noticed by the Commission, is open to intervention, comment, and protest, \n10 \nand is subject to Commission review and acceptance. LSPGC will include in each filing \n11 \nthe calculations, work papers, and testimony supporting the TRBAA Credits, so \n12 \ninterested parties can review and challenge those amounts in that proceeding. In addition, \n13 \nthe inputs to the Formula Rate Template, including the Covered Upgrade plant reported \n14 \non Attachment 1a and the amounts removed on Attachment 9, Line 18, are subject to the \n15 \nexisting information exchange, review, and challenge procedures of the Formula Rate \n16 \nImplementation Protocols. As a result, every amount affected by the proposal remains \n17 \nsubject to review and challenge in one or both of these processes. \n18 \nQ. \nWHAT CHANGES TO THE TO TARIFF ARE NEEDED TO IMPLEMENT THIS \n19 \nAPPROACH? \n20 \nA. \nSection 5.3 of the TO Tariff currently provides for the TRBAA to flow Transmission \n21 \nRevenue Credits through to transmission customers. The TO Tariff defines Transmission \n22 \nRevenue Credits as the proceeds received from the CAISO, other than for the recovery of \n23 \nLSPGC’s Regional Transmission Revenue Requirement through the Regional \n24 \nTransmission Access Charges. Because CRA-related credits include amounts received \n25"},{"page":376,"startToken":130318,"endToken":130624,"text":"12 \n \ndirectly from or on behalf of the Eligible Customer and Annual Termination Fee Credits \n1 \nscheduled under Section 3.3.4, LSPGC proposes to revise the definition of the TRBAA \n2 \nand Section 5.3 so that the TRBAA also flows through to transmission customers all \n3 \namounts a CRA requires to be credited through it. The revisions add amounts recorded in \n4 \nthe TRBA under a CRA to Cr, add any forecast credit a CRA requires to Cf, and include \n5 \namounts recorded in the TRBA under a CRA in the TRBA principal balance used to \n6 \ncalculate interest. The revisions also clarify that Section 5.3 does not require the payment \n7 \nof interest between LSPGC and an Eligible Customer, which is governed solely by the \n8 \nCRA. The definition of Transmission Revenue Credits is unchanged. \n9 \nQ. \nHOW WILL TRBAA CREDITS BE REFLECTED IN THE ANNUAL TRBAA \n10 \nFILING? \n11 \nA. \nLSPGC will add the following lines to the TRBA and TRBAA calculation it files each \n12 \nyear, as shown in Exhibit No. LSC-202: \n13 \n• Lines 7a through 7d record Supplemental MTRC Receipts, Applied Security \n14 \nProceeds, Annual Termination Fee Credits, and duplicate-recovery credits and \n15 \nother adjustments, including reversals of amounts later refunded and adjustments \n16 \nresulting from the resolution of disputes under the CRA. Applied Security \n17 \nProceeds used to pay a Termination Fee are held in the Termination Fee Account \n18 \nand credited through the Annual Termination Fee Credits on Line 7c, rather than \n19 \non Line 7b. These amounts are included in Net Payment on Line 8; and \n20 \n• Cf on Line 18 is separated into other Transmission Revenue Credits (Line 18a) \n21 \nand the Forecast TRBAA Credit (Line 18b), which equals the projected \n22 \nSupplemental MTRC for the following calendar year, increased or reduced by any \n23"},{"page":377,"startToken":130624,"endToken":130929,"text":"13 \n \nprior-period true-up adjustment, plus any Annual Termination Fee Credit \n1 \nscheduled for that year. \n2 \nBecause TRBAA Credits are included in Net Payment, any difference between the credit \n3 \nreflected in CAISO payments and the TRBAA Credits recorded becomes part of the \n4 \nTRBA balance and accrues interest in the same manner as other TRBA balances. Absent \n5 \nTRBAA Credits, these lines are zero and the calculation is unchanged. \n6 \nQ. \nWHY DO TRBA BALANCES RELATED TO TRBAA CREDITS ACCRUE \n7 \nINTEREST WHILE PRIOR-PERIOD TRUE-UP ADJUSTMENTS DO NOT? \n8 \nA. \nInterest applies when LSPGC holds funds that belong to transmission customers, or when \n9 \ntransmission customers hold funds owed to LSPGC. A TRBA balance created by a late \n10 \npayment, a non-payment before security is applied, or the timing of monthly installments \n11 \nreflects an actual over- or under-recovery by LSPGC, so it accrues interest like any other \n12 \nTRBA balance. A prior-period true-up adjustment is different. When further \n13 \nSupplemental MTRC will be invoiced, the adjustment is added to the Supplemental \n14 \nMTRC invoiced for a later Rate Year and to the Forecast TRBAA Credit for that same \n15 \nRate Year, so the matched adjustment does not itself create an over- or under-recovery by \n16 \nLSPGC. Differences between the credit reflected in CAISO payments and actual receipts \n17 \nor applied amounts remain subject to TRBA interest. When no further Supplemental \n18 \nMTRC will be invoiced, Section 6.6 instead requires a separate invoice or refund, with \n19 \nthe receipt or refund recorded in the TRBA when received or paid. Consistent with \n20 \nSection 6.6 of the CRA and Section 5.3 of the TO Tariff, no interest accrues on a prior-\n21 \nperiod true-up adjustment between LSPGC and the Eligible Customer; interest on any \n22 \nresulting TRBA balance is calculated separately. \n23"},{"page":378,"startToken":130929,"endToken":131227,"text":"14 \n \nQ. \nWILL LSPGC SUPPORT THESE AMOUNTS IN EACH ANNUAL TRBAA \n1 \nFILING? \n2 \nA. \nYes. In each annual TRBAA filing, LSPGC will provide the TRBA and TRBAA \n3 \ncalculation substantially in the form of Exhibit No. LSC-202, together with work papers \n4 \nsupporting the Forecast TRBAA Credit and the TRBAA Credits recorded during the \n5 \nTRBA year, and its witness will testify to those amounts. As provided in Section 6.8 of \n6 \nthe CRA, those work papers may present customer-specific information on an aggregated \n7 \nbasis or be submitted with a request for privileged treatment under 18 C.F.R. § 388.112. \n8 \nQ. \nARE ANY CHANGES NEEDED TO APPENDIX I OF THE TO TARIFF? \n9 \nA. \nNo. Appendix I states that LSPGC’s TRR equals its Base TRR plus its TRBAA, and that \n10 \nthe TRBAA is computed in accordance with Section 5.3 of the TO Tariff and the CAISO \n11 \nTariff. TRBAA Credits are included in the TRBAA amount stated in Appendix I each \n12 \nyear, so no change to its terms is required. \n13 \nVI. \nLSPGC’S FORMULA RATE TEMPLATE \n14 \nQ. \nARE ANY CHANGES TO LSPGC’S FORMULA RATE TEMPLATE NEEDED \n15 \nTO IMPLEMENT THE PROPOSAL? \n16 \nA. \nNo. LSPGC’s Formula Rate Template already contains the features the proposal requires: \n17 \n• Attachment 1a – Project Plant Detail Worksheet reports monthly transmission \n18 \ngross plant, accumulated depreciation, Construction Work in Progress (“CWIP”), \n19 \nand unamortized abandoned plant, and the resulting net plant, separately for each \n20 \nproject. A Covered Upgrade is reported as its own project on Attachment 1a, and \n21 \nthe Attachment 1a totals tie to Attachment 4 and Appendix III; \n22 \n• Attachment 1 – Project Revenue Requirement Worksheet calculates the revenue \n23 \nrequirement of each project using the same allocation factors applied to all \n24"},{"page":379,"startToken":131227,"endToken":131525,"text":"15 \n \nLSPGC transmission plant, so each Covered Upgrade’s revenue requirement \n1 \nreflects its share of total plant; and \n2 \n• Attachment 9 – Revenue Credit Detail, Line 18, “Less: Revenue Credits included \n3 \nin the TRBAA,” removes from Formula Rate revenue credits any amounts \n4 \ncredited to customers through the TRBAA. \n5 \nAdditional project lines may be added to Attachments 1a and 1 as Covered Upgrades are \n6 \nplaced in service. Because the Attachment 1a totals tie to Attachment 4 and Appendix III, \n7 \nreporting plant by project does not change total plant or the total revenue requirement. \n8 \nQ. \nHOW DOES ATTACHMENT 9, LINE 18 APPLY TO TRBAA CREDITS? \n9 \nA. \nConsistent with Section 6.8 of the CRA, TRBAA Credits are credited solely through the \n10 \nTRBAA and are not Formula Rate revenue credits. Line 18 is a safeguard: to the extent \n11 \nany TRBAA Credits are recorded in the revenue accounts included on Attachment 9, \n12 \nLine 15, Line 18 removes them, so they are credited to customers once, through the \n13 \nTRBAA, and not also through the Formula Rate. \n14 \nQ. \nARE ANY CHANGES NEEDED TO THE FORMULA RATE \n15 \nIMPLEMENTATION PROTOCOLS? \n16 \nA. \nNo. The Formula Rate Implementation Protocols already require LSPGC to provide \n17 \nsupporting documentation for data used in the Formula Rate that are not stated in the \n18 \nFERC Form No. 1, and to include a variance analysis of revenue credits with an \n19 \nexplanation of material changes, which will include the amounts on Attachment 9, Line \n20 \n18. The existing posting, review, challenge, and true-up procedures apply to Covered \n21 \nUpgrades reported on Attachment 1a without change. TRBAA Credits are reviewed in \n22 \nLSPGC’s annual TRBAA filing under Section 205 of the Federal Power Act, as I \n23 \ndescribed above. \n24"},{"page":380,"startToken":131525,"endToken":131845,"text":"16 \n \nVII. \nILLUSTRATIVE EXHIBITS \n1 \nQ. \nPLEASE DESCRIBE EXHIBIT NO. LSC-201. \n2 \nA. \nExhibit No. LSC-201 is LSPGC’s currently effective Formula Rate Template populated \n3 \nwith hypothetical data for the 2030 Rate Year to illustrate the treatment of a Covered \n4 \nUpgrade. The example includes the Gates and Round Mountain projects and one $60 \n5 \nmillion Covered Upgrade placed in service January 1, 2030, reported as Project C on \n6 \nAttachments 1a and 1, consistent with the illustrative CRA worksheet sponsored by Mr. \n7 \nHayes (Exhibit No. LSC-101). In that worksheet, the Covered Upgrade has an Annual \n8 \nMTRC of $10,278,360 and projected Qualifying Transmission Revenues of $3,363,840, \n9 \nfor a Supplemental MTRC of $6,914,520. In Exhibit No. LSC-201: \n10 \n• Because the Covered Upgrade is placed in service January 1, 2030, it is not \n11 \nincluded in the December 2029 plant balance, and its 13-month average gross \n12 \nplant is $55.38 million. The Covered Upgrade’s revenue requirement on \n13 \nAttachment 1 is $10.21 million and the total Base TRR is $34.91 million; \n14 \n• TRBAA Credits of $6,914,520 are assumed to be recorded in a revenue account \n15 \nreported on Attachment 9, Line 14, and are removed on Line 18, so they do not \n16 \nreduce the Base TRR; without Line 18, the Base TRR would be $28.00 million \n17 \nand the amounts would be credited twice; \n18 \n• The Covered Upgrade’s first-year Formula Rate revenue requirement of $10.21 \n19 \nmillion differs from its Annual MTRC of $10.28 million because the two are \n20 \ncalculated separately and on different bases. The Annual MTRC is calculated \n21 \nunder Schedule 5 of the CRA and, once finalized, is fixed subject to the \n22 \nadjustments expressly permitted by Section 6.3.1. Its levelized calculation uses a \n23 \ntwenty-year MTRC Term to recover the allocated capital cost and the return, \n24"},{"page":381,"startToken":131845,"endToken":132147,"text":"17 \n \ntaxes, and fixed expenses reflected in Schedule 5. The Formula Rate revenue \n1 \nrequirement is recalculated each year using 13-month average balances and book \n2 \ndepreciation rates, so this January 1 in-service example includes a zero December \n3 \n2029 plant balance in the 13-month average even though the upgrade is in service \n4 \nfor all of 2030. All else equal, the capital-related revenue requirement declines as \n5 \nthe plant depreciates. The difference does not affect LSPGC’s revenue: the \n6 \nCovered Upgrade is recovered through the Base TRR, and all TRBAA Credits are \n7 \nreturned to customers through the TRBAA; and \n8 \n• The example does not model the cost containment adjustments for the Gates and \n9 \nRound Mountain projects, which apply only to those projects and do not affect the \n10 \nCovered Upgrade. \n11 \nThe illustrative data are hypothetical and are not LSPGC or customer data. \n12 \nQ. \nPLEASE DESCRIBE EXHIBIT NO. LSC-202. \n13 \nA. \nExhibit No. LSC-202 illustrates the TRBA and TRBAA calculation for two consecutive \n14 \nTRBA years ending September 30, 2030 and 2031, using the Supplemental MTRC from \n15 \nExhibit No. LSC-101 and the Base TRR from Exhibit No. LSC-201. For trade months \n16 \nbefore January 2030, the example uses a Base TRR that excludes the Covered Upgrade; \n17 \nthe 2030 Base TRR is then held constant so the TRBA balances shown result only from \n18 \nthe TRBAA Credits. Two years are shown because the TRBAA operates on a lag: a \n19 \ncredit included in Cf in one filing is compared to actual receipts in the following TRBA \n20 \nyear, and any difference is returned in the filing after that. \n21 \n• In the TRBA year ending September 30, 2030, the annual $6,914,520 credit takes \n22 \neffect January 1, 2030, and Supplemental MTRC Receipts replace the reduction \n23"},{"page":382,"startToken":132147,"endToken":132453,"text":"18 \n \nin CAISO payments. Only a small timing difference remains, because the \n1 \nSupplemental MTRC is invoiced in equal monthly installments while CAISO \n2 \npayments reflect the days in each month. The resulting TRBA balance of $6,833 \n3 \nand interest of $355 are returned to customers, and the TRBAA effective January \n4 \n1, 2031 is a credit of $6,921,708. \n5 \n• In the TRBA year ending September 30, 2031, the example assumes two \n6 \nhypothetical events. First, the 2030 Reconciliation Statement shows that the \n7 \nEligible Customer was under-billed by $100,000. Under the CRA, that prior-\n8 \nperiod true-up adjustment is added to the Supplemental MTRC invoiced for 2032 \n9 \nand to the 2032 Forecast TRBAA Credit on Line 18b of $7,014,520, so it does not \n10 \ncreate a TRBA balance and carries no interest. Second, the Eligible Customer \n11 \npays its installment for August 2031 service after September 30. Together with \n12 \nthe remaining timing difference, the late payment produces a TRBA under-\n13 \ncollection of $573,097, which is included in Cr with interest of $1,407 and \n14 \nreverses when the payment is received in the next TRBA year. The TRBAA \n15 \neffective January 1, 2032 is a credit of $6,440,016. \n16 \nThe illustrative data are hypothetical and are not LSPGC or customer data. \n17 \nVIII. CONCLUSION \n18 \nQ. \nWHY ARE THE PROPOSED REVISIONS JUST AND REASONABLE? \n19 \nA. \nThe revisions implement the Commission’s direction that large load payments be credited \n20 \ntoward transmission owners’ revenue requirements, using LSPGC’s existing TRBAA \n21 \nmechanism. Each Eligible Customer pays at least its committed Annual MTRC for each \n22 \nCovered Upgrade, and TRBAA Credits reduce the TRR paid by all customers through the \n23 \nTAC. LSPGC retains none of the TRBAA Credits, and Attachment 9, Line 18 ensures \n24"},{"page":383,"startToken":132453,"endToken":132509,"text":"19 \n \nthey are credited only once. LSPGC’s Formula Rate is unchanged, and Covered \n1 \nUpgrades are reported as separate projects on the existing Attachment 1a. The existing \n2 \nFormula Rate review procedures and LSPGC’s annual TRBAA filing provide full \n3 \ntransparency for the new calculations. \n4 \nQ. \nDOES THIS CONCLUDE YOUR TESTIMONY? \n5 \nA. \nYes.\n6"},{"page":384,"startToken":132509,"endToken":132587,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \n \n \n \n \nLS Power Grid California, LLC \nCalifornia Independent System Operator Corporation \n) \n) \nDocket No. \nDocket No.  \nER27-___-000 \nEL26-71-___ \n \nVERIFICATION  \n \n \n \nI, D. Eric Arzola, verify under penalty of perjury that I have read the testimony, know the \ncontents thereof, and that the facts and representations set forth therein are true to the best of my \nknowledge, information, and belief. \n \n \n \n \n \n \n \n \n \n \n/s/ D. Eric Arzola \n \n \n \n \n \n \nD. Eric Arzola \n \n \nDated: November 16, 2026"},{"page":385,"startToken":132587,"endToken":132594,"text":"Ex. LSC-201 \n \nIllustrative Formula Rate Template (Excel)"},{"page":386,"startToken":132594,"endToken":132600,"text":"Ex. LSC-202 \n \nIllustrative TRBAA Calculation (Excel)"},{"page":387,"startToken":132600,"endToken":132691,"text":"CERTIFICATE OF SERVICE \n \nPursuant to Rule 2010 of the Rules of Practice and Procedure of the Federal Energy \nRegulatory Commission, 18 C.F.R. § 385.2010, I hereby certify that I have this day caused a copy \nof the foregoing ﬁling of LS Power Grid California, LLC to be served electronically upon each \nperson designated on the oﬃcial service list in Docket No. EL26-71-000 and upon each other \nperson entitled to service under the Commission’s regulations. \nDated at Washington, DC, this 16th day of November 2026. \n/s/ Alexandra Zak __ ___  \nAlexandra Zak"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":223,"startToken":0,"endToken":506},{"p":2,"at":223,"title":"I. INTRODUCTION AND SUMMARY OF FILING","method":"printed heading","endPage":3,"endAt":223,"startToken":506,"endToken":1018},{"p":3,"at":223,"title":"II. BACKGROUND","method":"printed heading","endPage":3,"endAt":240,"startToken":1018,"endToken":1020},{"p":3,"at":240,"title":"A. LS Power Grid and Its Formula Rate","method":"printed heading","endPage":3,"endAt":1601,"startToken":1020,"endToken":1231},{"p":3,"at":1601,"title":"B. Show Cause Order and Stakeholder Process","method":"printed heading","endPage":4,"endAt":661,"startToken":1231,"endToken":1626},{"p":4,"at":661,"title":"III. DESCRIPTION OF THE PROPOSED REVISIONS","method":"printed heading","endPage":4,"endAt":706,"startToken":1626,"endToken":1632},{"p":4,"at":706,"title":"A. Large Load Interconnection Framework (Section 10A and Appendix VI)","method":"printed heading","endPage":5,"endAt":2464,"startToken":1632,"endToken":2396},{"p":5,"at":2464,"title":"B. Pro Forma CRA (Appendix V)","method":"printed heading","endPage":8,"endAt":1081,"startToken":2396,"endToken":3929},{"p":8,"at":1081,"title":"C. Crediting CRA Amounts Through the TRBAA (Sections 3 and 5.3)","method":"printed heading","endPage":9,"endAt":1799,"startToken":3929,"endToken":4672},{"p":9,"at":1799,"title":"D. Formula Rate Template and Rate Treatment of Covered Upgrades","method":"printed heading","endPage":10,"endAt":1058,"startToken":4672,"endToken":5136},{"p":10,"at":1058,"title":"E. Supporting Testimony and Illustrative Exhibits","method":"printed heading","endPage":10,"endAt":2518,"startToken":5136,"endToken":5354},{"p":10,"at":2518,"title":"IV. THE PROPOSED REVISIONS ARE JUST AND REASONABLE","method":"printed heading","endPage":11,"endAt":2635,"startToken":5354,"endToken":5902},{"p":11,"at":2635,"title":"V. REQUESTED EFFECTIVE DATE AND WAIVERS","method":"printed heading","endPage":12,"endAt":224,"startToken":5902,"endToken":6106},{"p":12,"at":224,"title":"VI. CONTENTS OF FILING","method":"printed heading","endPage":12,"endAt":967,"startToken":6106,"endToken":6209},{"p":12,"at":967,"title":"VII. COMMUNICATIONS AND SERVICE","method":"printed heading","endPage":13,"endAt":411,"startToken":6209,"endToken":6501},{"p":13,"at":411,"title":"VIII. CONCLUSION","method":"printed heading","endPage":15,"endAt":86,"startToken":6501,"endToken":6578},{"p":15,"at":86,"title":"Table of Contents","method":"printed heading","endPage":130,"endAt":6,"startToken":6578,"endToken":48488},{"p":130,"at":6,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":164,"endAt":678,"startToken":48488,"endToken":62179},{"p":164,"at":678,"title":"I. Large Load Interconnection Customer (ECLL) Contact Information","method":"printed heading","endPage":164,"endAt":841,"startToken":62179,"endToken":62199},{"p":164,"at":841,"title":"II. Large Load Customer Information","method":"printed heading","endPage":164,"endAt":1221,"startToken":62199,"endToken":62255},{"p":164,"at":1221,"title":"III. Point of Interconnection","method":"printed heading","endPage":165,"endAt":8,"startToken":62255,"endToken":62313},{"p":165,"at":8,"title":"IV. Large Load Capacity and Load Ramp Schedule","method":"printed heading","endPage":165,"endAt":230,"startToken":62313,"endToken":62341},{"p":165,"at":230,"title":"V. Proposed Service Commencement Date and Term","method":"printed heading","endPage":165,"endAt":283,"startToken":62341,"endToken":62348},{"p":165,"at":283,"title":"VI. Source of Power","method":"printed heading","endPage":165,"endAt":309,"startToken":62348,"endToken":62352},{"p":165,"at":309,"title":"VII. Site Plan, Site Control, and Permits","method":"printed heading","endPage":166,"endAt":155,"startToken":62352,"endToken":62542},{"p":166,"at":155,"title":"VIII. Co-Located Generation","method":"printed heading","endPage":166,"endAt":501,"startToken":62542,"endToken":62587},{"p":166,"at":501,"title":"IX. Single-Line Diagram and Modeling Information","method":"printed heading","endPage":166,"endAt":1284,"startToken":62587,"endToken":62693},{"p":166,"at":1284,"title":"X. Required Submittals (LLIP Section 4.2.1)","method":"printed heading","endPage":166,"endAt":1736,"startToken":62693,"endToken":62766},{"p":166,"at":1736,"title":"XI. Acknowledgment","method":"printed heading","endPage":169,"endAt":99,"startToken":62766,"endToken":62889},{"p":169,"at":99,"title":"Table of Contents","method":"printed heading","endPage":288,"endAt":6,"startToken":62889,"endToken":105241},{"p":288,"at":6,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":322,"endAt":678,"startToken":105241,"endToken":118932},{"p":322,"at":678,"title":"I. Large Load Interconnection Customer (ECLL) Contact Information","method":"printed heading","endPage":322,"endAt":841,"startToken":118932,"endToken":118952},{"p":322,"at":841,"title":"II. Large Load Customer Information","method":"printed heading","endPage":322,"endAt":1221,"startToken":118952,"endToken":119008},{"p":322,"at":1221,"title":"III. Point of Interconnection","method":"printed heading","endPage":323,"endAt":8,"startToken":119008,"endToken":119066},{"p":323,"at":8,"title":"IV. Large Load Capacity and Load Ramp Schedule","method":"printed heading","endPage":323,"endAt":230,"startToken":119066,"endToken":119094},{"p":323,"at":230,"title":"V. Proposed Service Commencement Date and Term","method":"printed heading","endPage":323,"endAt":283,"startToken":119094,"endToken":119101},{"p":323,"at":283,"title":"VI. Source of Power","method":"printed heading","endPage":323,"endAt":309,"startToken":119101,"endToken":119105},{"p":323,"at":309,"title":"VII. Site Plan, Site Control, and Permits","method":"printed heading","endPage":324,"endAt":155,"startToken":119105,"endToken":119295},{"p":324,"at":155,"title":"VIII. Co-Located Generation","method":"printed heading","endPage":324,"endAt":501,"startToken":119295,"endToken":119340},{"p":324,"at":501,"title":"IX. Single-Line Diagram and Modeling Information","method":"printed heading","endPage":324,"endAt":1284,"startToken":119340,"endToken":119446},{"p":324,"at":1284,"title":"X. Required Submittals (LLIP Section 4.2.1)","method":"printed heading","endPage":324,"endAt":1736,"startToken":119446,"endToken":119519},{"p":324,"at":1736,"title":"XI. Acknowledgment","method":"printed heading","endPage":328,"endAt":37,"startToken":119519,"endToken":119685},{"p":328,"at":37,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":330,"endAt":52,"startToken":119685,"endToken":119754},{"p":330,"at":52,"title":"I. INTRODUCTION AND EXPERIENCE","method":"printed heading","endPage":330,"endAt":138,"startToken":119754,"endToken":119767},{"p":330,"at":138,"title":"A. My name is Patrick Hayes. My business address is 16150 Main Circle Drive, Suite 310,","method":"printed heading","endPage":331,"endAt":562,"startToken":119767,"endToken":120031},{"p":331,"at":562,"title":"II. PURPOSE AND SCOPE OF TESTIMONY","method":"printed heading","endPage":331,"endAt":651,"startToken":120031,"endToken":120047},{"p":331,"at":651,"title":"A. The purpose of this testimony is to provide relevant context and details regarding","method":"printed heading","endPage":332,"endAt":412,"startToken":120047,"endToken":120281},{"p":332,"at":412,"title":"A. Yes. I am sponsoring the following exhibits:","method":"printed heading","endPage":332,"endAt":625,"startToken":120281,"endToken":120305},{"p":332,"at":625,"title":"III. FERC SHOW CAUSE ORDERS","method":"printed heading","endPage":332,"endAt":709,"startToken":120305,"endToken":120319},{"p":332,"at":709,"title":"A. On June 18, 2026, the FERC instituted show cause proceedings under section 206 of the","method":"printed heading","endPage":333,"endAt":1267,"startToken":120319,"endToken":120669},{"p":333,"at":1267,"title":"A. Yes, Commissioners Chang and See each issued separate concurrences providing","method":"printed heading","endPage":335,"endAt":779,"startToken":120669,"endToken":121167},{"p":335,"at":779,"title":"IV. CAISO STAKEHOLDER PROCESS","method":"printed heading","endPage":335,"endAt":913,"startToken":121167,"endToken":121188},{"p":335,"at":913,"title":"A. CAISO convened joint coordination meetings with the California Participating","method":"printed heading","endPage":336,"endAt":569,"startToken":121188,"endToken":121393},{"p":336,"at":569,"title":"A. LSPGC coordination highlighted the need to ensure that an affected PTO has a","method":"printed heading","endPage":337,"endAt":769,"startToken":121393,"endToken":121673},{"p":337,"at":769,"title":"A. LSPGC proposes a pro forma CRA that establishes the Eligible Customer’s minimum","method":"printed heading","endPage":337,"endAt":1380,"startToken":121673,"endToken":121765},{"p":337,"at":1380,"title":"V. COST RECOVERY AGREEMENT","method":"printed heading","endPage":337,"endAt":1448,"startToken":121765,"endToken":121776},{"p":337,"at":1448,"title":"A. The CRA is a pro forma contract between LSPGC, as Transmission Owner, and the","method":"printed heading","endPage":338,"endAt":994,"startToken":121776,"endToken":121994},{"p":338,"at":994,"title":"A. At a high level, the CRA responds directly to the three cost-recovery concerns identified","method":"printed heading","endPage":339,"endAt":107,"startToken":121994,"endToken":122158},{"p":339,"at":107,"title":"A. The core payment mechanism is the Supplemental Minimum Transmission Revenue","method":"printed heading","endPage":340,"endAt":1381,"startToken":122158,"endToken":122655},{"p":340,"at":1381,"title":"A. The Annual MTRC operates as a revenue floor, not an additive charge. Under Section","method":"printed heading","endPage":341,"endAt":1195,"startToken":122655,"endToken":122939},{"p":341,"at":1195,"title":"A. The CRA addresses stranded-asset risk through a twenty-year revenue commitment,","method":"printed heading","endPage":344,"endAt":354,"startToken":122939,"endToken":123690},{"p":344,"at":354,"title":"A. Section 7.1 recognizes Construction Security provided under an interconnection or","method":"printed heading","endPage":345,"endAt":242,"startToken":123690,"endToken":123958},{"p":345,"at":242,"title":"A. Section 6.8 establishes TRBAA Credits rather than Formula Rate revenue credits. In each","method":"printed heading","endPage":346,"endAt":11,"startToken":123958,"endToken":124205},{"p":346,"at":11,"title":"VI. TARIFF IMPLEMENTATION AND REVIEW","method":"printed heading","endPage":346,"endAt":110,"startToken":124205,"endToken":124219},{"p":346,"at":110,"title":"A. The pro forma CRA establishes the contractual revenue-support and security obligations","method":"printed heading","endPage":346,"endAt":859,"startToken":124219,"endToken":124345},{"p":346,"at":859,"title":"A. The CRA contemplates an Eligible Customer for Large Load (“ECLL”) or Transmission","method":"printed heading","endPage":347,"endAt":92,"startToken":124345,"endToken":124487},{"p":347,"at":92,"title":"A. LSPGC’s existing Attachment 1a – Project Plant Detail Worksheet reports plant","method":"printed heading","endPage":347,"endAt":1312,"startToken":124487,"endToken":124667},{"p":347,"at":1312,"title":"A. Article 5 identifies the CRA as the form of agreement required under Section 10.9 and","method":"printed heading","endPage":348,"endAt":299,"startToken":124667,"endToken":124809},{"p":348,"at":299,"title":"A. As Mr. Arzola explains, Covered Upgrades are subject to LSPGC’s Commission-","method":"printed heading","endPage":348,"endAt":1816,"startToken":124809,"endToken":125048},{"p":348,"at":1816,"title":"A. Under Sections 6.1 and 12.3, the Formula Rate and Protocols continue to govern the","method":"printed heading","endPage":349,"endAt":1663,"startToken":125048,"endToken":125321},{"p":349,"at":1663,"title":"A. Section 6.6 carries an under-billed or over-billed Supplemental MTRC amount into","method":"printed heading","endPage":350,"endAt":1096,"startToken":125321,"endToken":125534},{"p":350,"at":1096,"title":"A. The Annual Projection workpapers and annual Reconciliation Statement make the","method":"printed heading","endPage":351,"endAt":956,"startToken":125534,"endToken":125774},{"p":351,"at":956,"title":"A. Yes, it does.","method":"printed heading","endPage":362,"endAt":248,"startToken":125774,"endToken":127011},{"p":362,"at":248,"title":"D. ERIC ARZOLA","method":"printed heading","endPage":363,"endAt":0,"startToken":127011,"endToken":127030},{"p":363,"at":0,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":365,"endAt":24,"startToken":127030,"endToken":127106},{"p":365,"at":24,"title":"D. ERIC ARZOLA","method":"printed heading","endPage":365,"endAt":44,"startToken":127106,"endToken":127109},{"p":365,"at":44,"title":"I. INTRODUCTION AND EXPERIENCE","method":"printed heading","endPage":365,"endAt":133,"startToken":127109,"endToken":127123},{"p":365,"at":133,"title":"A. My name is D. Eric Arzola. My business address is 16150 Main Circle Drive, Suite 310,","method":"printed heading","endPage":365,"endAt":776,"startToken":127123,"endToken":127233},{"p":365,"at":776,"title":"A. Yes. I have submitted testimony in Federal Energy Regulatory Commission (“FERC” or","method":"printed heading","endPage":366,"endAt":288,"startToken":127233,"endToken":127380},{"p":366,"at":288,"title":"II. PURPOSE AND SUMMARY OF TESTIMONY","method":"printed heading","endPage":366,"endAt":377,"startToken":127380,"endToken":127396},{"p":366,"at":377,"title":"A. The purpose of my testimony is to explain how LSPGC will recover the cost of","method":"printed heading","endPage":366,"endAt":1707,"startToken":127396,"endToken":127601},{"p":366,"at":1707,"title":"A. LSPGC proposes to credit the amounts it receives under its CRAs to transmission","method":"printed heading","endPage":367,"endAt":688,"startToken":127601,"endToken":127740},{"p":367,"at":688,"title":"A. No. LSPGC’s Formula Rate is unchanged. Covered Upgrades are included in LSPGC’s","method":"printed heading","endPage":367,"endAt":1370,"startToken":127740,"endToken":127849},{"p":367,"at":1370,"title":"A. Yes. I am sponsoring the following exhibits:","method":"printed heading","endPage":367,"endAt":1538,"startToken":127849,"endToken":127870},{"p":367,"at":1538,"title":"III. LSPGC AND FORMULA RATE BACKGROUND","method":"printed heading","endPage":367,"endAt":1650,"startToken":127870,"endToken":127889},{"p":367,"at":1650,"title":"A. LSPGC is a transmission-only Participating Transmission Owner in the CAISO. LSPGC","method":"printed heading","endPage":368,"endAt":589,"startToken":127889,"endToken":128006},{"p":368,"at":589,"title":"A. By October 5, LSPGC posts an Annual Projection of its net revenue requirement for the","method":"printed heading","endPage":368,"endAt":1073,"startToken":128006,"endToken":128086},{"p":368,"at":1073,"title":"A. As provided in Appendix I of the TO Tariff, LSPGC’s Transmission Revenue","method":"printed heading","endPage":369,"endAt":195,"startToken":128086,"endToken":128246},{"p":369,"at":195,"title":"A. In the Show Cause Order, the Commission directed the CAISO and its transmission","method":"printed heading","endPage":369,"endAt":885,"startToken":128246,"endToken":128354},{"p":369,"at":885,"title":"IV. THE LARGE LOAD COST RECOVERY FRAMEWORK","method":"printed heading","endPage":370,"endAt":62,"startToken":128354,"endToken":128534},{"p":370,"at":62,"title":"A. Each Covered Upgrade placed under the CAISO’s Operational Control is included in","method":"printed heading","endPage":370,"endAt":999,"startToken":128534,"endToken":128675},{"p":370,"at":999,"title":"A. The Supplemental MTRC is calculated separately for each Covered Upgrade as the","method":"printed heading","endPage":370,"endAt":1539,"startToken":128675,"endToken":128764},{"p":370,"at":1539,"title":"A. The Supplemental MTRC follows the same calendar as the Formula Rate. With each","method":"printed heading","endPage":371,"endAt":913,"startToken":128764,"endToken":128954},{"p":371,"at":913,"title":"A. If an Eligible Customer does not pay, LSPGC may draw on the Eligible Customer’s","method":"printed heading","endPage":372,"endAt":871,"startToken":128954,"endToken":129256},{"p":372,"at":871,"title":"A. The CRA uses the term “TRBAA Credits” for the Forecast TRBAA Credit and the","method":"printed heading","endPage":373,"endAt":125,"startToken":129256,"endToken":129423},{"p":373,"at":125,"title":"A. Covered Upgrades will be subject to LSPGC’s Commission-accepted Formula Rate and","method":"printed heading","endPage":374,"endAt":6,"startToken":129423,"endToken":129685},{"p":374,"at":6,"title":"V. CREDITING CRA AMOUNTS TO CUSTOMERS THROUGH THE TRBAA","method":"printed heading","endPage":374,"endAt":125,"startToken":129685,"endToken":129705},{"p":374,"at":125,"title":"A. Through the TRBAA. Each October, LSPGC will include the Forecast TRBAA Credit","method":"printed heading","endPage":374,"endAt":1524,"startToken":129705,"endToken":129934},{"p":374,"at":1524,"title":"A. There are several reasons. First, the TRBAA already exists to credit customers with","method":"printed heading","endPage":375,"endAt":523,"startToken":129934,"endToken":130097},{"p":375,"at":523,"title":"A. No. LSPGC’s annual TRBAA filing is made under Section 205 of the Federal Power Act.","method":"printed heading","endPage":375,"endAt":1495,"startToken":130097,"endToken":130254},{"p":375,"at":1495,"title":"A. Section 5.3 of the TO Tariff currently provides for the TRBAA to flow Transmission","method":"printed heading","endPage":376,"endAt":870,"startToken":130254,"endToken":130472},{"p":376,"at":870,"title":"A. LSPGC will add the following lines to the TRBA and TRBAA calculation it files each","method":"printed heading","endPage":377,"endAt":566,"startToken":130472,"endToken":130714},{"p":377,"at":566,"title":"A. Interest applies when LSPGC holds funds that belong to transmission customers, or when","method":"printed heading","endPage":378,"endAt":80,"startToken":130714,"endToken":130943},{"p":378,"at":80,"title":"A. Yes. In each annual TRBAA filing, LSPGC will provide the TRBA and TRBAA","method":"printed heading","endPage":378,"endAt":673,"startToken":130943,"endToken":131047},{"p":378,"at":673,"title":"A. No. Appendix I states that LSPGC’s TRR equals its Base TRR plus its TRBAA, and that","method":"printed heading","endPage":378,"endAt":991,"startToken":131047,"endToken":131108},{"p":378,"at":991,"title":"VI. LSPGC’S FORMULA RATE TEMPLATE","method":"printed heading","endPage":378,"endAt":1128,"startToken":131108,"endToken":131130},{"p":378,"at":1128,"title":"A. No. LSPGC’s Formula Rate Template already contains the features the proposal requires:","method":"printed heading","endPage":379,"endAt":668,"startToken":131130,"endToken":131336},{"p":379,"at":668,"title":"A. Consistent with Section 6.8 of the CRA, TRBAA Credits are credited solely through the","method":"printed heading","endPage":379,"endAt":1162,"startToken":131336,"endToken":131422},{"p":379,"at":1162,"title":"A. No. The Formula Rate Implementation Protocols already require LSPGC to provide","method":"printed heading","endPage":380,"endAt":6,"startToken":131422,"endToken":131526},{"p":380,"at":6,"title":"VII. ILLUSTRATIVE EXHIBITS","method":"printed heading","endPage":380,"endAt":83,"startToken":131526,"endToken":131537},{"p":380,"at":83,"title":"A. Exhibit No. LSC-201 is LSPGC’s currently effective Formula Rate Template populated","method":"printed heading","endPage":381,"endAt":957,"startToken":131537,"endToken":131999},{"p":381,"at":957,"title":"A. Exhibit No. LSC-202 illustrates the TRBA and TRBAA calculation for two consecutive","method":"printed heading","endPage":382,"endAt":1300,"startToken":131999,"endToken":132372},{"p":382,"at":1300,"title":"VIII. CONCLUSION","method":"printed heading","endPage":382,"endAt":1383,"startToken":132372,"endToken":132385},{"p":382,"at":1383,"title":"A. The revisions implement the Commission’s direction that large load payments be credited","method":"printed heading","endPage":383,"endAt":343,"startToken":132385,"endToken":132506},{"p":383,"at":343,"title":"A. Yes.","method":"printed heading","endPage":384,"endAt":541,"startToken":132506,"endToken":132580},{"p":384,"at":541,"title":"D. Eric Arzola","method":"printed heading","endPage":387,"endAt":0,"startToken":132580,"endToken":132600},{"p":387,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":387,"endAt":557,"startToken":132600,"endToken":132691}]}