{"document":{"slug":"rec-20261116-5335-2","title":"Att E Pro Forma LL CRA","issued":"2026-11-16","accession":"20261116-5335","docket":"ER27-529-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"New York Independent System Operator, Inc.Central Hudson Gas & Electric CorporationNew York State Electric & Gas Corporation ,Rochester Gas and Electric Corporation ,Niagara Mohawk Power Corporation ,Consolidated Edison Company of New York, Inc. ,Orange and Rockland Utilities, Inc. ,","kind":"attachment","file":"sources/filings/text/20261116-5335_006.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5335","tier":"record","parent":"rec-20261116-5335","sha256":"89d0812cfba6bbe2f59edd2946bd4c611cf138aa1de7be377852885e7d906a68","pages":26,"tokens":9426,"emptyPages":[],"textThemes":["cost","credit","study"]},"pages":[{"page":1,"startToken":0,"endToken":9,"text":"Attachment E \nPro Forma Large Load Cost Recovery Agreement"},{"page":2,"startToken":9,"endToken":40,"text":"44.16.9 Appendix 9 to Attachment LL – Pro Forma Cost Recovery Agreement \n \nPRO FORMA LARGE LOAD COST RECOVERY AGREEMENT \nBETWEEN \n[NEW YORK TRANSMISSION OWNER] (Transmission Owner) \nAND \n[CUSTOMER NAME] (Customer)"},{"page":3,"startToken":40,"endToken":141,"text":"TABLE OF CONTENTS \nRecitals and Regulatory Context \nArticle 1: Definitions \nArticle 2: Jurisdictional Harmonization \nArticle 3: Scope and Construction of Network Upgrades and TO Attachment Facilities \nArticle 4: Recovery of Network Upgrade and TO Attachment Facility Costs \nArticle 5: Customer Payments \nArticle 6: Financial Security, Creditworthiness, and Exit Protection \nArticle 7: Breach, Default, and Remedies \nArticle 8: Term and Termination \nArticle 9: Miscellaneous and Regulatory Reservations \n• \nAppendix A: Description and Engineering Specifications of Network Upgrades and \nTransmission Owner Attachment Facilities \n• \nAppendix B: Revenue Requirement Breakdown \n• \nAppendix C: True-Up and Annual Revenue Crediting Accounting Protocols \n• \nAppendix D: Addresses for Notices and Billing"},{"page":4,"startToken":141,"endToken":503,"text":"PRO FORMA LARGE LOAD COST RECOVERY AGREEMENT \nThis PRO FORMA LARGE LOAD COST RECOVERY AGREEMENT (the “Agreement”) \nis entered into as of this [___] day of [___], 20[__], by and between: \n• \n[NEW YORK TRANSMISSION OWNER] (“Transmission Owner” or “Connecting \nTransmission Owner” or “Affected Transmission Owner”), a [corporation] organized and \nexisting under the laws of the State of New York, having an office and place of business \nat [___________]; and \n• \n[CUSTOMER NAME] (“Customer”), a [corporation / limited liability company] \norganized under the laws of the State of [______], having an office and place of business \nat [______], and owning a Large Load Facility with an expected peak demand of [__] \nMW at the Point of Interconnection. \nTransmission Owner and Customer are collectively referred to as the “Parties,” and each \nindividually as a “Party.” \nRECITALS \nWHEREAS, Customer has submitted a Large Load Integration Request to interconnect or serve \na Large Load Facility with an aggregate demand equal to or exceeding fifty megawatts (50 MW) \n[at a transmission-system interconnection point within the Transmission Owner’s service \nterritory] or [affecting the Affected Transmission Owner’s transmission facilities in New York \nState]; \nWHEREAS, New York Independent System Operator, Inc. (“NYISO”) and/or Transmission \nOwner have performed system reliability impact studies, facility studies, and engineering \nassessments pursuant to the NYISO Open Access Transmission Tariff (“OATT”), identifying \nthat the interconnection and commercial operation of Customer’s Large Load Facility will \nnecessitate the construction and placement into service of certain Network Upgrades and/or TO \nAttachment Facilities on the [Transmission Owner’s] [Affected Transmission Owner’s] \ntransmission system to maintain electric system reliability and system adequacy; and \nWHEREAS, Customer has received the cost allocation for Network Upgrades and/or TO \nAttachment Facilities identified by System Impact Studies and Facilities Studies under \nAttachment LL of the NYISO OATT or successor tariff provisions and has entered into, and \nposted Financial Security for the benefit of [Transmission Owner] [Affected Transmission \nOwner] in accordance with, the Large Load Security Agreement; \nNOW, THEREFORE, in consideration of the mutual covenants and agreements herein \ncontained, the Parties agree as follows: \nARTICLE 1: DEFINITIONS \nWherever used in this Agreement, capitalized terms not defined herein shall have the meanings \nassigned to them in the NYISO OATT or NYISO Market Services Tariff."},{"page":5,"startToken":503,"endToken":1038,"text":"1.1 “Affiliate”: means, with respect to a person or entity, any other person or entity directly or \nindirectly controlling, controlled by, or under common control with such person or entity. \n“Control” means the possession, directly or indirectly, of the power to direct the management or \npolicies of a person or entity; a voting interest of ten percent (10%) or more creates a rebuttable \npresumption of control.  \n1.2 “Assessment Period”: A term of 15 years commencing on the Commencement Date. \n1.3 “Commercial Operation Date” (COD): The date on which Customer’s Large Load Facility \nhas achieved energization and begins taking firm electric service pursuant to [the applicable \nTariff] or [the Large Load Interconnection Agreement] at or above its designated minimum \ncapacity commitment, as confirmed by notice delivered under the Large Load Interconnection \nAgreement. \n1.4 “Commencement Date”: The date upon which the Network Upgrade and/or TO Attachment \nFacility is placed in service, as reflected in the In-Service Date under the Large Load \nInterconnection Agreement [or other applicable agreement]. \n1.5 “Cure Date”: The last day of the applicable cure period under Section 7.2. \n1.6 “FERC”: The Federal Energy Regulatory Commission or its regulatory successor. \n1.7 “Large Load Facility”: A newly interconnecting or expanded end-use electric load, co-\nlocated arrangement, or data center facility with an anticipated peak electrical demand equal to \nor exceeding 50 MW connecting at a voltage of 69 kV or higher. \n1.8 “Large Load Upgrade Charge”: The monthly charge billed to Customer under Article 4 to \nrecover the revenue requirement for the Network Upgrades and the TO Attachment Facilities \nspecified in Appendix B. \n1.9 “Net Present Value Residual Charge”: A lump sum payment equal to the net present value \nof the Customer’s obligations under the remaining term of this Agreement at the time of \ntermination that would have been collected over the remaining term of the Assessment Period, \nplus any cost of removal if applicable, calculated using the inputs set forth in Appendix B for \neach Identified Upgrade set forth in Appendix A. The discount rate shall be equal to the interest \nrate pursuant to Section 35.19a of FERC’s regulations, or successor regulation, effective at the \ntime of termination. To the extent the calculation of the Net Present Value Residual Charge \nrequires estimates of the Customer’s remaining obligations, such estimates shall be determined \nby the Transmission Owner in its reasonable discretion. \n1.10 “Network Upgrades”: Additions, modifications, enhancements, or replacements (other \nthan TO Attachment Facilities) to the [Transmission Owner’s] [Affected Transmission Owner’s] \nelectric transmission system required at or beyond the Point of Interconnection to accommodate \nthe Customer’s Large Load Facility reliably under NERC, NPCC, NYSRC, and Transmission \nOwner [Affected Transmission Owner] reliability criteria and identified through the Large Load \nIntegration Procedures contained at Attachment LL of the NYISO OATT and set forth in \n[Appendix A, the Large Load Interconnection Agreement, and/or other applicable agreement]. \n1.11 “NY PSC”: The New York State Public Service Commission or its regulatory successor. \n1.12 “Reimbursable Costs”: Costs and expenses incurred by the Transmission Owner in \nplanning, designing, engineering, permitting, procuring, project managing, constructing, testing, \nand commissioning the Network Upgrades and the TO Attachment Facilities, including any"},{"page":6,"startToken":1038,"endToken":1471,"text":"incremental costs resulting from a Customer-requested suspension or a Customer delay under \nSection 3.3, consistent with Good Utility Practice. \n1.13 “Related Agreements”: Collectively, this Agreement, the Large Load Interconnection \nAgreement, the Large Load Security Agreement, and any other applicable agreement referenced \nin Section 3.4. \n1.14 “TO Attachment Facilities”: All facilities and equipment owned or controlled by \nTransmission Owner between the Point of Interconnection and the Point of Change of \nOwnership that are constructed or modified for the purpose of interconnecting the Large Load \nFacility, including line taps, breakers, disconnect switches, bus work, metering instrument \ntransformers (if owned by Transmission Owner), System Protection Facilities at a Transmission \nOwner substation, and associated civil and structural works, as described in [Appendix A, the \nLarge Load Interconnection Agreement, and/or other applicable agreement]. \nARTICLE 2: JURISDICTIONAL HARMONIZATION \n2.1 Jurisdictional Harmonization. Nothing in this Agreement shall be construed as: \n(a) An assertion by the Parties of FERC jurisdiction over bundled retail transmission and \ndistribution rates established by the NY PSC; or \n(b) A waiver by Transmission Owner or Customer of any rights, claims, or defenses \nunder the Federal Power Act (“FPA”) or the New York Public Service Law concerning \nthe jurisdictional boundary between wholesale and retail ratemaking. \nARTICLE 3: SCOPE AND CONSTRUCTION OF NETWORK \nUPGRADES AND TO ATTACHMENT FACILITIES  \n3.1 Identification of Upgrades. Transmission Owner shall engineer, design, procure, construct, \ninstall, commission, own, operate, and maintain the Network Upgrades and the TO Attachment \nFacilities detailed in Appendix A and the Large Load Interconnection Agreement, or other \napplicable agreement, which were, in turn, identified through the process contained within \nAttachment LL of the NYISO OATT. \n3.2 Milestones and Construction Schedule. Transmission Owner shall use commercially \nreasonable efforts to engineer, design, procure, and construct the Network Upgrades and the TO \nAttachment Facilities in accordance with the milestone schedule set forth in [the Large Load \nInterconnection Agreement and/or other applicable agreement]. All such milestones, other than \nthe In-Service Date of the Network Upgrades and TO Attachment Facilities, are good faith \nestimates, and a change to any such milestone shall not require an amendment of this Agreement. \nCustomer acknowledges that environmental review, Article VII and Article VIII permitting, and \nall property acquisitions are subject to New York State regulatory approvals and external \ncontingencies. \n3.3 Suspension and Customer Delays. If Customer requests a suspension of construction or \ndelays its commercial in-service milestone, Customer shall remain liable for all carrying costs, \nre-sequencing and re-mobilization costs, and cancellation fees incurred by Transmission Owner \nunder Good Utility Practice during such suspension or delay. Transmission Owner reserves the"},{"page":7,"startToken":1471,"endToken":2013,"text":"right to notify Customer if such suspension or delay is expected to increase the total estimated \ncost of the Network Upgrades or the TO Attachment Facilities and to require additional Financial \nSecurity in accordance with the Large Load Security Agreement. \n3.4 Related Agreements. This Agreement is entered into in connection with, and shall be read \ntogether with, [the Large Load Interconnection Agreement between Transmission Owner and \nCustomer dated [●] (the “Large Load Interconnection Agreement”)] [and/or other applicable \nagreement] and the Large Load Security Agreement between Transmission Owner and Customer \ndated [●] (the “Large Load Security Agreement”). Customer shall be the same legal entity as the \ncustomer under the Large Load Interconnection Agreement (or other applicable agreement) and \nthe Large Load Security Agreement. In the event of any conflict between this Agreement and \nany Related Agreement regarding the costs of, or charges for, the Network Upgrades or the TO \nAttachment Facilities, this Agreement shall control; and in the event of any conflict between this \nAgreement and any Related Agreement regarding Financial Security, the Large Load Security \nAgreement shall control. \nARTICLE 4: RECOVERY OF NETWORK UPGRADE AND TO \nATTACHMENT FACILITY COSTS \n4.1 Customer Responsibility for Allocated Network Upgrade and TO Attachment Facilities \nRevenue Requirement. Customer shall be responsible for and shall pay to the Transmission \nOwner the revenue requirement associated with the cost allocation to Customer for required \nNetwork Upgrades and TO Attachment Facilities identified in the Facilities Study specified at \nSection 44.12.1.8 of Attachment LL of the NYISO OATT, or successor provisions as set forth in \nAppendix A. The revenue requirement shall include, without limitation, appropriate depreciation \nor amortization, return, income and property taxes, operation and maintenance expenses, \nmetering installation, administrative costs, and other costs as specified in Appendix B. The \nrevenue requirement breakdown is specified herein at Appendix B. \n4.2 Large Load Upgrade Charge. The revenue requirement specified at Appendix B shall be \nrecovered through a Large Load Upgrade Charge. This Agreement shall be specific to a single \nLarge Load Facility, as determined by the Transmission Owner in its reasonable discretion. \nTransmission Owner shall calculate a separate charge for each Identified Upgrade (as defined in \nAppendix B) for which Customer is responsible, as set forth in Section 3 of Appendix B, and the \nmonthly Large Load Upgrade Charge shall be the sum of all such Identified Upgrade-specific \nmonthly charges. The monthly Large Load Upgrade Charge is specified at Section 4 of \nAppendix B for each month of years one (1) through the final year of the Assessment Period. \nThe Transmission Owner shall follow the true-up procedures set forth in Section 6 of Appendix \nB. \n4.3 Early Termination. If, prior to the expiration of the Assessment Period, this Agreement is \nterminated, or Customer is in default under this Agreement or the Large Load Security \nAgreement and fails to timely cure the default, Customer shall be liable to the Transmission \nOwner for the Net Present Value Residual Charge, and the Transmission Owner shall be entitled \nto draw upon the Financial Security and apply it toward the Net Present Value Residual Charge. \nIf any other outstanding charges or payments are due, Customer shall pay them within thirty (30) \ndays of the termination date or the Cure Date, as applicable."},{"page":8,"startToken":2013,"endToken":2510,"text":"4.4 TO Attachment Facilities. Customer shall be responsible for and shall pay to the \nTransmission Owner (a) all actual costs incurred by Transmission Owner for studies, \nengineering, design, procurement, construction, oversight, testing, and commissioning of the TO \nAttachment Facilities, including applicable overheads, taxes, and line outage costs, to the extent \nnot covered by any study cost reimbursement agreement or allocated otherwise under the NYISO \nOATT; and (b) Transmission Owner’s reasonable and prudent costs, including, without \nlimitation, overheads, of operating, maintaining, repairing, and replacing the TO Attachment \nFacilities, except to the extent such costs are paid by a third party using such facilities. Unless \notherwise agreed to by Transmission Owner and Customer in Section 7 of Appendix B, such \ncosts shall be [included in the revenue requirement specified at Appendix B and recovered \nthrough the Large Load Upgrade Charge] [billed as a separately stated component of the Large \nLoad Upgrade Charge] [, at Transmission Owner’s election, paid by Customer as a contribution \nin aid of construction in advance of or as incurred during construction], and Sections 4.3 and 6.2 \nand Appendix C shall apply to the TO Attachment Facilities in the same manner as to the \nNetwork Upgrades. Customer’s responsibility for, and the recovery of, the costs of the TO \nAttachment Facilities shall be governed exclusively by this Agreement. \nARTICLE 5: CUSTOMER PAYMENTS \n5.1 Commencement Date. Customer’s responsibility to make monthly payments shall begin as \nof the Commencement Date. \n5.2 Monthly Billing and Payments. The Large Load Upgrade Charge shall be billed monthly by \nTransmission Owner with Customer payment due within thirty (30) days. Monthly bills and \npayments shall be transmitted electronically in accordance with the information contained at \nAppendix D, or through paper copies, as the Parties may specify, using the addresses contained \nat Appendix D. The Parties shall cooperate in good faith to effectuate efficient billing and \npayment. \n5.3 Late Payments. Customer shall pay all invoices on or before their due date, regardless of \nwhether Customer disputes the same in good faith. Any balances that remain unpaid when due \nshall accrue interest at the interest rate specified at 18 C.F.R. § 35.19a or successor regulation. \nTransmission Owner may include unpaid balances, with any accrued interest, on the next \nmonthly bill. Any disputes shall be addressed in accordance with Section 9.11. \nARTICLE 6: FINANCIAL SECURITY, CREDITWORTHINESS, \nAND EXIT PROTECTION \n6.1 Obligation to Post Financial Security. To protect other retail and wholesale customers \nagainst stranded asset risk in the event Customer fails to achieve the Commercial Operation \nDate, downscales its capacity requirements, or abandons installation of the Large Load Facility, \nCustomer shall post and maintain security in favor of [Transmission Owner] [Affected \nTransmission Owner] in the amount and manner specified in the separate Large Load Security \nAgreement (“Financial Security”). Subject to the determination of obligations under Appendix B \nof this Agreement, nothing in this Agreement limits in any way the obligations of Customer \nunder the Large Load Security Agreement."},{"page":9,"startToken":2510,"endToken":2937,"text":"6.2 Stranded Cost Recovery Upon Abandonment (Exit Protection). If Transmission Owner \nor Customer terminates this Agreement prematurely or otherwise defaults on its financial \nobligations: \n(a) To the extent that Transmission Owner determines within its reasonable discretion \nthat the Network Upgrade is no longer needed, including based on written confirmation \nfrom NYISO that completion of the Network Upgrade is not required and that no other \ninterconnection request, NYISO interconnection or transmission planning study \n(including any Reliability Needs Assessment or Short-Term Assessment of Reliability), \nor base case relies on completion of the Network Upgrade, Transmission Owner shall \npromptly cease incurring uncommitted costs and make reasonable efforts to mitigate \nlosses, except in the case of actions necessary to preserve system reliability, avoid injury \nor loss of human life, or prevent environmental degradation. If NYISO informs \nTransmission Owner in writing that the Network Upgrade must be completed, \nTransmission Owner may continue to engineer, procure, and construct the Network \nUpgrade, and Customer shall remain responsible for all Reimbursable Costs of \ncompleting the Network Upgrade in accordance with Section 6.2(b). \n(b) Transmission Owner shall be entitled to draw upon the Financial Security as specified \nin the Large Load Security Agreement to recover all Reimbursable Costs, including \nwithout limitation engineering costs, committed equipment cancellation fees, \nenvironmental remediation costs, the costs to restore the bulk electric system to safe and \nreliable condition, including necessary expediting and acceleration fees, any non-\nsalvageable construction expenditures, the costs of removal, relocation, retirement, or \nother disposition of any facilities already installed, and, where the Network Upgrade \nremains needed under Section 6.2(a), the costs of completing the Network Upgrade. \nCustomer shall remain liable for any such costs remaining unpaid after application of the \nFinancial Security. \n(c) Any excess security remaining after full recovery and true-up shall be promptly \nrefunded to Customer. \n6.3 Reduction in Maximum Load Facility Peak Demand. Any reduction of the Maximum \nLoad Facility Peak Demand under Section 3.6 of the Large Load Interconnection Agreement \nshall not reduce the Large Load Upgrade Charge, the Net Present Value Residual Charge, or the \nFinancial Security, unless otherwise agreed in writing by the Parties. \nARTICLE 7: BREACH, DEFAULT, AND REMEDIES \n7.1 Events of Default. An Event of Default shall occur if Customer: \n(a) Fails to pay any amount when due; \n(b) Fails to provide, maintain, renew, replace, or increase the Financial Security as \nrequired under Article 6 and the Large Load Security Agreement; \n(c) Becomes insolvent, files for bankruptcy, or undergoes dissolution; \n(d) Abandons or materially repudiates its development or interconnection obligations; or"},{"page":10,"startToken":2937,"endToken":3355,"text":"(e) Is in default under the Large Load Interconnection Agreement (or other applicable \nagreement) or the Large Load Security Agreement and any applicable cure period \nthereunder has expired.  \n7.2 Notice and Opportunity to Cure. Upon the occurrence of an Event of Default, the non-\ndefaulting Party shall provide written notice. The defaulting Party shall have (i) five (5) Business \nDays after receipt of notice to cure any failure to pay any amount when due or to provide, \nmaintain, renew, replace, or increase Financial Security, and (ii) thirty (30) days after receipt of \nnotice to cure any other default that is capable of cure; provided that a cross-default under \nSection 7.1(e) shall arise only after expiration of the cure period in the applicable Related \nAgreement, and no additional cure period shall apply under this Agreement. \n7.3 Remedies. If an Event of Default is not remedied by the Cure Date, the non-defaulting Party \nmay: \n(a) Terminate this Agreement upon written notice; \n(b) Draw upon the Financial Security to satisfy outstanding liabilities; \n(c) Suspend engineering, procurement, and construction of the Network Upgrades and the \nTO Attachment Facilities; and \n(d) Pursue any legal or equitable remedies available under New York State law or the \nFPA. \nARTICLE 8: TERM AND TERMINATION \n8.1 Effective Date. This Agreement shall become effective upon execution by all Parties within \nthe timeframe set forth in Attachment LL of the NYISO OATT[, subject to any filing with FERC \nthat may be required under Section 205 of the FPA]. \n8.2 Term. This Agreement shall remain in full force and effect until all Large Load Upgrade \nCharge obligations and other payment obligations under Articles 4 and 5, including any Net \nPresent Value Residual Charge, have been fully satisfied. \n8.3 Regulatory Modification. Without creating any additional regulatory filing obligations, if \nFERC or the NY PSC issues an order requiring a material modification, including termination or \nrejection, of this Agreement, the Parties shall negotiate in good faith for sixty (60) days to \nconform the Agreement. If agreement cannot be reached, Transmission Owner may terminate \nthis Agreement and draw upon the Financial Security for all incurred, unrecoverable \nReimbursable Costs.  \n8.4 Cross-Termination. Termination of the Large Load Interconnection Agreement (or other \napplicable agreement) for any reason other than Transmission Owner’s Default (including \nCustomer’s termination for convenience or non-renewal) shall constitute early termination of this \nAgreement for purposes of Section 4.3, and the Net Present Value Residual Charge shall become \ndue. \nARTICLE 9: MISCELLANEOUS AND REGULATORY \nRESERVATIONS"},{"page":11,"startToken":3355,"endToken":3959,"text":"9.1 Governing Law. This Agreement shall be governed by, construed, and enforced in \naccordance with the laws of the State of New York, without regard to its conflict of law \nprinciples, except to the extent that matters fall within the exclusive jurisdiction of FERC, the \nFPA, or federal common law. \n9.2 FPA Sections 205 and 206 Reservations. Nothing contained in this Agreement shall limit \nthe statutory right of Transmission Owner to unilaterally file with FERC, under Section 205 of \nthe FPA and FERC’s regulations, for modifications in rates, charges, classifications, or terms of \nservice; nor shall it restrict the rights of Customer or the NY PSC under Section 206 of the FPA. \n9.3 Severability. If any provision of this Agreement is held invalid, illegal, or unenforceable by \na court or regulatory agency of competent jurisdiction, the remaining provisions shall continue in \nfull force, provided the core economic and jurisdictional balance intended by the Parties remains \nintact. \n9.4 Execution in Counterparts. This Agreement may be executed in two or more counterparts, \neach of which shall be deemed an original, but all of which together shall constitute one and the \nsame instrument. \n9.5 Notice. Unless otherwise provided in this Agreement, any required notice shall be made in \nwriting, and shall be effective when delivered by recognized national courier, certified or \nregistered mail, personal delivery, electronic mail, or another method permitted by this \nAgreement, addressed to the Party at the address set forth in Appendix D. \n9.6 Amendment; Waiver. This Agreement may be amended, superseded, or modified by a \nwritten instrument executed by both Parties, subject to any required filing with and acceptance \nby FERC and any required approval of the NY PSC. No waiver shall be effective unless in \nwriting and signed by the Party against whom it is sought to be enforced. The failure of a Party \nto insist on strict performance on any occasion shall not be a waiver, and no waiver of any \nbreach shall be a continuing waiver or a waiver of any other or subsequent breach. \n9.7 Assignment. No Party may assign this Agreement without the prior written consent of the \nother Party, which consent shall not be unreasonably withheld, conditioned, or delayed; provided \nthat Transmission Owner may assign this Agreement on notice, without consent, to an Affiliate \nor in connection with a sale, merger, restructuring, or transfer of all or substantially all of its \nassets, so long as the assignee assumes in writing all rights and obligations under this \nAgreement. Any assignment by Customer (other than a collateral assignment) and any change of \ncontrol of Customer shall require Transmission Owner’s prior written consent, not to be \nunreasonably withheld, conditioned, or delayed, and shall be conditioned on (i) the assignee \nassuming in writing all obligations under this Agreement, the Large Load Interconnection \nAgreement, and the Large Load Security Agreement, each of which shall be assigned to the same \nassignee at the same time; and (ii) Customer reimbursing Transmission Owner’s reasonable costs \nof administering the assignment or performing due diligence with respect to a change of control. \nCustomer may assign this Agreement on notice, without consent, as collateral security in \nconnection with financing of the Large Load Facility. Any assignment in violation of this \nSection is void. No assignment relieves the assigning Party of its obligations. No assignment \nshall be effective unless the assignee provides and maintains Financial Security satisfying the \nrequirements of Article 6 and the Large Load Security Agreement, and no assignment by \nCustomer shall release Customer or any existing Financial Security until the assignee’s \nreplacement Financial Security has been posted and accepted."},{"page":12,"startToken":3959,"endToken":4517,"text":"9.8 Limitation of Liability. In no event, whether as a result of breach of contract, tort (including \nnegligence and strict liability), or otherwise, shall any Party be liable in connection with this \nAgreement for any special, indirect, incidental, penal, punitive, or consequential damages of any \nnature, including delays, lost profits, business interruptions, and claims of suppliers and \ncustomers, whether or not such damages were reasonably foreseeable or such Party was advised \nthat such damages might be incurred; provided that this Section shall not limit Customer’s \nobligation to pay the Large Load Upgrade Charge, the Net Present Value Residual Charge, costs \nrecoverable under Sections 3.3, 4.3, 6.2, and 8.3, or other amounts due under this Agreement. \nTRANSMISSION OWNER MAKES NO WARRANTIES, REPRESENTATIONS, OR \nGUARANTEES IN CONNECTION WITH THIS AGREEMENT, THE NETWORK \nUPGRADES, THE TO ATTACHMENT FACILITIES, OR ANY WORK PERFORMED BY \nTRANSMISSION OWNER, WHETHER WRITTEN OR ORAL, STATUTORY, EXPRESS OR \nIMPLIED, INCLUDING, WITHOUT LIMITATION, THE IMPLIED WARRANTIES OF \nMERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, ALL OF WHICH \nARE HEREBY EXPRESSLY EXCLUDED AND DISCLAIMED. \n9.9 Force Majeure. No Party shall be considered in default of any obligation under this \nAgreement to the extent its performance is prevented or delayed by an event of Force \nMajeure, provided that such Party gives prompt written notice and uses reasonable efforts to \nresume performance. “Force Majeure” means any act of God, labor disturbance, act of the \npublic enemy, war, terrorism, insurrection, riot, fire, storm, flood or other unusually severe \nweather, earthquake, epidemic, explosion, breakage or accident to machinery or equipment, \nany order, regulation, or restriction imposed by a governmental, military, or lawfully \nestablished civilian authority (including any delay by a governmental authority), or any other \ncause beyond the reasonable control of the Party claiming Force Majeure. Force Majeure \ndoes not include acts of negligence or intentional wrongdoing by the Party claiming Force \nMajeure, or the lack of funds or financing. Force Majeure shall not include, with respect to \nCustomer: (a) economic hardship, changes in market conditions, or the cost or unavailability \nof financing; (b) delays in Customer’s procurement of equipment or failure of Customer’s \nsuppliers or contractors, unless caused by an independent Force Majeure event; (c) labor \ndisputes involving only Customer’s or its contractors’ workforce; (d) Customer’s failure to \nobtain required permits or approvals, unless it has diligently and timely pursued them; or (e) \nchanges in the demand for, or the business case of, the Large Load Facility’s end use. Force \nMajeure shall not excuse any obligation to make payments or to post and maintain Financial \nSecurity. \n9.10 \nEffect of Force Majeure. A Party shall be excused from performance (other than the \nobligation to pay money when due or to timely post and maintain Financial Security) to the \nextent prevented by Force Majeure, provided it gives prompt notice with full particulars \n(confirming any telephone notice in writing), keeps the other Party informed, and exercises \ndue diligence to remedy the effects with reasonable dispatch. A Party shall not be required to \nsettle a labor dispute on terms unsatisfactory to it. \n9.11 Dispute Resolution. \n(a) Notice and Informal Resolution. A Party asserting a dispute arising out of or relating \nto this Agreement (a “Dispute”) shall give written notice (a “Notice of Dispute”). The \nDispute shall be referred to designated senior representatives of the Parties for good-faith \nnegotiation."},{"page":13,"startToken":4517,"endToken":5105,"text":"(b) Arbitration by Agreement. If the Dispute is not resolved within [thirty (30) / sixty \n(60)] days after receipt of the Notice of Dispute, the Parties may, by mutual agreement, \nsubmit it to arbitration under Section 9.11(c). Absent such agreement, either Party may \npursue any remedy available at law or in equity, including proceedings before FERC, the \nNY PSC, or a court of competent jurisdiction. Any court proceeding arising out of or \nrelating to this Agreement shall be brought exclusively in the courts identified in Section \n14.3 of the Large Load Interconnection Agreement. EACH PARTY KNOWINGLY, \nVOLUNTARILY, AND IRREVOCABLY WAIVES ANY RIGHT TO TRIAL BY JURY \nOF ANY DISPUTE ARISING OUT OF OR RELATING TO THIS AGREEMENT, TO \nTHE FULLEST EXTENT PERMITTED BY APPLICABLE LAW. Notwithstanding this \nSection 9.11, (i) either Party may at any time seek temporary, preliminary, or injunctive \nrelief, or specific performance, from a court of competent jurisdiction or from FERC or the \nNY PSC to prevent irreparable harm, protect system reliability or safety, or preserve the \nstatus quo, without first complying with Section 9.11(a); and (ii) the informal resolution \nand arbitration procedures shall not delay or limit Transmission Owner’s exercise of its \nrights under Article 6, Section 7.3, and Section 8.3, or Customer’s payment obligations \nunder Article 5 or its obligation to provide and maintain Financial Security under Article \n6 and the Large Load Security Agreement. \n(c) Arbitration Procedures. Any arbitration shall be conducted before a single neutral \narbitrator, or, if the Parties cannot agree on one within ten (10) days, a three-member panel \n(one appointed by each Party and a third selected by the two party-appointed arbitrators), \neach knowledgeable in electric utility matters and without substantial business \nrelationships with either Party, under the Commercial Arbitration Rules of the American \nArbitration Association, except as modified herein. The arbitrator(s) shall render a written, \nreasoned decision within ninety (90) days of appointment, shall have no authority to \nmodify this Agreement, and the decision shall be final, with judgment enterable in any \ncourt of competent jurisdiction, subject to appeal only on grounds permitted by the Federal \nArbitration Act. Each Party shall bear its own costs, the cost of its appointed arbitrator, and \none-half of the cost of the single or third arbitrator. \n(d) Continued Performance; Termination. Pending resolution, each Party shall continue \nto perform its obligations, including by paying disputed amounts, and Customer shall \ncontinue to provide and maintain Financial Security as required under Article 6 and the \nLarge Load Security Agreement. The pendency of a Dispute shall not suspend or toll any \ncure period under Article 7 or limit Transmission Owner’s rights described in Section \n9.11(b)(ii). Whether a termination is proper shall not be subject to arbitration unless the \nParties agree otherwise. \n9.12 Confidentiality. Subject to any reporting or posting obligations under the NYISO OATT \nand any directives or requirements of FERC, the NY PSC, or NYISO, information exchanged \nunder this Agreement that is designated confidential by the disclosing Party, including Critical \nEnergy/Electric Infrastructure Information, shall be held in confidence and used only for \npurposes of this Agreement, subject to the confidentiality provisions of the NYISO OATT, \napplicable laws and regulations, and any non-disclosure agreements between the Parties; \nprovided that nothing in this Section shall restrict the disclosure of cost information required \nunder the NYISO OATT or any filing with FERC or the NY PSC. Critical Energy/Electric \nInfrastructure Information shall be protected and disclosed only as permitted by 18 C.F.R. §"},{"page":14,"startToken":5105,"endToken":5654,"text":"388.113, the NYISO OATT, applicable NYISO procedures, and any FERC order. Transmission \nOwner may require Customer and its contractors, subcontractors, vendors, or agents to execute a \nseparate non-disclosure agreement as a condition of receiving confidential information or \nCritical Energy/Electric Infrastructure Information, and nothing in this Agreement shall limit, \nmodify, or supersede any such non-disclosure agreement. \n9.13 Representations and Warranties. As of the date of execution, each Party represents and \nwarrants to the other Party that: (i) it is duly organized, validly existing, and in good standing \nunder the laws of its jurisdiction of formation; (ii) it has all regulatory authorizations necessary \nto perform its obligations under this Agreement, other than any FERC [or NY PSC] acceptance \nthat may be required; (iii) its execution, delivery, and performance of this Agreement are within \nits powers, have been duly authorized, and do not violate its governing documents or, in any \nmaterial respect, any contract to which it is a party or any applicable law; and (iv) this \nAgreement is its legal, valid, and binding obligation, enforceable against it in accordance with its \nterms, subject to applicable bankruptcy, insolvency, and similar laws and to general principles of \nequity. Each Party further represents that the signatory identified beneath its name has full \nauthority to execute this Agreement on its behalf. \n9.14 No Third-Party Beneficiaries; No Partnership. This Agreement does not create rights, \nremedies, or benefits in favor of any person other than the Parties and their successors in interest \nand, where permitted, their assigns. This Agreement shall not be construed to create an \nassociation, joint venture, agency relationship, or partnership among the Parties, and no Party \nshall have authority to bind any other Party. \n9.15 Entire Agreement; Related Agreements. This Agreement, including its Appendices, \ntogether with the Large Load Interconnection Agreement, the Large Load Security Agreement, \nand any other applicable agreements, constitutes the entire agreement among the Parties with \nrespect to its subject matter and supersedes all prior discussions and understandings with respect \nthereto. \n9.16 Survival. Articles 4, 5, and 6, Sections 3.3, 7.3, 8.3, 9.8, 9.11, and 9.12, Section 6 of \nAppendix B, and any other provisions that by their nature are intended to survive, shall survive \nthe expiration or termination of this Agreement to the extent necessary to complete the recovery \nof amounts owed, including any Net Present Value Residual Charge and any final annual true-\nup, and the application or return of Financial Security. \n9.17 Rules of Interpretation. Unless a contrary intention clearly appears: the singular includes \nthe plural; references to any agreement, tariff, or law mean it as amended from time to time; \nreferences to Articles, Sections, and Appendices are to this Agreement; “including” means \nincluding without limitation; “hereunder,” “herein,” and similar words refer to this Agreement as \na whole; and “from” means “from and including,” “to” means “to but excluding,” and “through” \nmeans “through and including.” This Agreement, the Large Load Interconnection Agreement, \nand the Large Load Security Agreement are intended to operate together and shall be interpreted \nconsistently with one another and according to the terms of Section 3.4 of this Agreement in the \nevent of a conflict between or among the Related Agreements. Headings are for convenience \nonly and do not affect interpretation."},{"page":15,"startToken":5654,"endToken":5696,"text":"SIGNATURES \nIN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be duly executed \nby their authorized officers as of the day and year first written above. \n[NEW YORK TRANSMISSION OWNER] \nBy: ______________________________ \nName: ____________________________ \nTitle: ___________________________ \nDate: ____________________________ \n[CUSTOMER NAME] \nBy: ______________________________ \nName: ____________________________ \nTitle: ___________________________ \nDate: ____________________________"},{"page":16,"startToken":5696,"endToken":5736,"text":"APPENDIX A: REFERENCE TO NETWORK UPGRADES AND \nTO ATTACHMENT FACILITIES \n[Reference to Network Upgrades and TO Attachment Facilities as specified in Exhibit B of the \nLarge Load Interconnection Agreement[, as amended from time to time] [and/or other applicable \nagreement].]"},{"page":17,"startToken":5736,"endToken":5947,"text":"APPENDIX B: LARGE LOAD UPGRADE CHARGE \n1. Cost Transparency and Engineering Estimates \n[Identified Upgrade:] \nComponent Category \nEstimated Direct \nCosts \nEstimated \nIndirect Costs \nTotal Estimated \nCapital Cost \n[Substation Expansion & \nBreakers] \n$[___________] \n$[___________] \n$[___________] \n[Line Re-conductoring & \nTowers] \n$[___________] \n$[___________] \n$[___________] \n[Protection, Metering & \nTelemetry] \n$[___________] \n$[___________] \n$[___________] \n[Engineering, Permitting & \nROW] \n$[___________] \n$[___________] \n$[___________] \n[Overhead] \n$[___________] \n$[___________] \n$[___________] \n[AFUDC] \n$[___________] \n$[___________] \n$[___________] \n[ ] \n$[___________] \n$[___________] \n$[___________] \n[ ] \n$[___________] \n$[___________] \n$[___________] \n[ ] \n$[___________] \n$[___________] \n$[___________] \nTOTAL ESTIMATED \nEXPENDITURE \n$[___________] \n$[___________] \n$[___________] \n \nCustomer’s allocated share of the Total Estimated Capital Cost of each Identified Upgrade set forth \nin the table(s) above, inclusive of Estimated Direct Costs and Estimated Indirect Costs, shall \nconstitute the initial Estimated Network Upgrade Book Value for purposes of this Appendix B, \nsubject to replacement by the actual Reimbursable Costs of such Identified Upgrade in accordance \nwith Section 6(c) of this Appendix B and Section 1 of Appendix C. The Transmission Owner shall \nprovide a separate table for each Identified Upgrade allocated to Customer in connection with the \nLarge Load Facility. \n2. Defined Terms and Variables \nFor purposes of this Appendix B, the following terms and variables shall have the meanings set \nforth below. Capitalized terms used but not defined in this Appendix B shall have the meanings \nset forth in Article 1 of the Agreement. \n(a) [“Annual Deferred Revenue” means, for each Billing Year, the amount by which the \nEstimated Accelerated Annual Revenue Requirement exceeds the Estimated Annual \nRevenue Requirement for such Billing Year.]"},{"page":18,"startToken":5947,"endToken":6426,"text":"(b) “Annual On-going Charge Factor” or “OCF” means the annual percentage calculated \nby dividing the Transmission Owner’s applicable transmission and distribution \noperations and maintenance expenses, administrative and general expenses, property \ntaxes, payroll taxes, and other applicable expenses, excluding depreciation and \namortization expense, return on investment, and associated income taxes, by the \nTransmission Owner’s total transmission and distribution gross plant in service for the \napplicable period. \n(c) “Average Service Life” or “ASL” means the dollar weighted average composite \nservice life, expressed in years, of the property units comprising the Identified Upgrade, \ndetermined by weighting the service life associated with the depreciation rate approved \nfor the Transmission Owner for each applicable plant account by the portion of the \nEstimated Network Upgrade Book Value recorded to that plant account, consistent with \nSection 3 of this Appendix B. \n(d) “Billing Year” means each consecutive twelve (12) month period during the \nAssessment Period, the first of which shall commence on the Commencement Date and \neach subsequent one of which shall commence on the anniversary of the \nCommencement Date. \n(e) “Contract Term” or “CT” means the number of years in the Assessment Period, as \nspecified in Section 1.2 of the Agreement. \n(f) “Estimated Accelerated Annual Revenue Requirement” or “EAARR” means, for \neach Billing Year, the annual revenue requirement payable by Customer under this \nAgreement, determined in accordance with Section 3(e) of this Appendix B. \n(g) “Estimated Annual Revenue Requirement” or “EARR” means, for each Billing \nYear, the estimated annual revenue requirement associated with the Estimated Network \nUpgrade Book Value, determined in accordance with Section 3(c) of this Appendix B. \n(h) “Estimated Network Upgrade Book Value” or “ENUBV” means, for each Identified \nUpgrade, the Total Estimated Capital Cost set forth in Section 1 of this Appendix B, as \nsuch amount will be replaced by actual Reimbursable Costs in accordance with Section \n6(c) of this Appendix B and adjusted annually for deduction of accumulated \ndepreciation and amortization. \n(i) “Identified Upgrade” means each Network Upgrade and each TO Attachment Facility \nfor which Customer is responsible, in whole or in an allocated share, as identified in \nthe applicable Facilities Study and set forth in a table in Section 1 of this Appendix B. \nAn Identified Upgrade may consist of more than one component. \n(j) “Large Load Upgrade Gross Plant in Service” or “LLGP” means the capital cost of \nthe Identified Upgrade in service allocated to Customer under this Agreement, initially \nestimated and subsequently replaced by actual Reimbursable Costs under Section 6(c) \nof this Appendix B, before deduction of accumulated depreciation and amortization. \n(k) “Large Load Upgrade-Specific Capital Revenue Requirement” or “LLCRR” \nmeans, for each Billing Year, the sum of (i) depreciation and amortization expense \nattributable to the Identified Upgrade, calculated using the applicable approved \ndepreciation and amortization rates, and (ii) the authorized return on the Identified \nUpgrade-specific investment balance, including associated income taxes. The"},{"page":19,"startToken":6426,"endToken":6845,"text":"investment balance used to calculate return shall reflect accumulated depreciation and \namortization and any other applicable rate-base adjustments specified in this \nAgreement. This amount excludes expenses recovered through the Annual On-going \nCharge Factor. \n(l) “Rate Data Sources” has the meaning set forth in Section 5(b) of this Appendix B. \n(m) “T/D” means the transmission and distribution functions of the Transmission Owner’s \nelectric utility operations, as such functions are classified and functionalized in the Rate \nData Sources. \n(n) “Total T/D Investment Base” has the meaning set forth in Section 5(d) of this \nAppendix B. \n(o) “Total T/D Plant” or “TTDP” has the meaning set forth in Section 5(c) of this \nAppendix B. \n(p) “Total T/D Revenue Requirements Allocable” or “TRRA” has the meaning set forth \nin Section 5(e) of this Appendix B. \n3. Calculation of the Estimated Accelerated Annual Revenue Requirement \nFor each Billing Year during the Assessment Period, Transmission Owner shall calculate the \nEstimated Accelerated Annual Revenue Requirement, which shall constitute the annual Large \nLoad Upgrade Charge, by performing the following steps in sequence: \n(a) Step One – Estimated Network Upgrade Book Value. Transmission Owner shall \ndetermine the Estimated Network Upgrade Book Value for each Identified Upgrade, which \nshall equal the total estimated capital cost of such Identified Upgrade, inclusive of direct \ncosts, applicable indirect costs (including overheads and allowance for funds used during \nconstruction (“AFUDC”)), as set forth in Section 1 of this Appendix B and as recorded in \naccordance with FERC’s Uniform System of Accounts, 18 C.F.R. Part 101. \n(b) Step Two – Annual On-going Charge Factor and Large Load Upgrade-Specific \nCapital Revenue Requirement. Transmission Owner shall determine the Annual On-\ngoing Charge Factor in effect for the Billing Year in accordance with Sections 5 and 6 of \nthis Appendix B. Transmission Owner shall also determine the LLCRR for the applicable \nBilling Year using the applicable approved inputs and Identified Upgrade-specific \ninvestment balances. \n(c) Step Three – Estimated Annual Revenue Requirement. Transmission Owner shall \nadd the LLCRR to the product of the Large Load Upgrade Gross Plant in Service and the \nAnnual On-going Charge Factor, and round the sum to the nearest [rounding increment to \nbe specified by Transmission Owner], as follows: \nEARR = LLCRR + (LLGP × OCF) \nThe Estimated Annual Revenue Requirement represents the estimated annual cost of \nowning, operating, and maintaining the Identified Upgrade. \n(d) Step Four – Average Service Life and Contract Term. Transmission Owner shall \ndetermine the Average Service Life of the Identified Upgrade and the Contract Term, each"},{"page":20,"startToken":6845,"endToken":7283,"text":"expressed in years, in accordance with the definitions set forth in Section 2 of this Appendix \nB. \n(e) Step Five – Estimated Accelerated Annual Revenue Requirement. Transmission \nOwner shall multiply the Estimated Annual Revenue Requirement by the Average Service \nLife and divide the product by the Contract Term, as follows: \nEAARR = (EARR × ASL) ÷ CT \nThe resulting Estimated Accelerated Annual Revenue Requirement provides for the \nrecovery within the Contract Term of the aggregate Estimated Annual Revenue \nRequirements that would otherwise be recovered over the Average Service Life of the \nIdentified Upgrade. \n(f) Annual and Monthly Large Load Upgrade Charge. Transmission Owner shall \nperform the calculation set forth in this Section 3 separately for each Identified Upgrade. \nThe annual Large Load Upgrade Charge for each Billing Year shall equal the sum of the \nEstimated Accelerated Annual Revenue Requirements for all Identified Upgrades for that \nBilling Year. The monthly Large Load Upgrade Charge shall equal one-twelfth of the \nannual Large Load Upgrade Charge, as set forth in Section 4 of this Appendix B. \n4. Monthly Large Load Upgrade Charge Schedule \n[Transmission Owner to insert the monthly Large Load Upgrade Charge for each month of Billing \nYears one (1) through [the final Billing Year of the Contract Term], calculated in accordance with \nSection 3 of this Appendix B.]  \nThe schedule set forth in this Section 4 shall be revised for each Billing Year to reflect the annual \nupdate and any true-up performed under Section 6 of this Appendix B, and Transmission Owner \nshall provide the revised schedule to Customer in accordance with Section 6(d) of this Appendix \nB. A revision of this schedule made in accordance with this Appendix B shall not constitute an \namendment of the Agreement under Section 9.6 of the Agreement. \n5. Annual On-going Charge Factor: Methodology and Input Data Sources \n(a) Formula. The Annual On-going Charge Factor shall equal the Total T/D Revenue \nRequirements Allocable divided by the Total T/D Plant, as follows: \nOCF = TRRA ÷ TTDP \nFor purposes of calculating the OCF, the TRRA used in the numerator shall exclude \ndepreciation and amortization expense, return on investment, and associated income \ntaxes, and TTDP represents total transmission and distribution gross plant in service. \n(b) Rate Data Sources. Each input to the Annual On-going Charge Factor shall be derived \nexclusively from the following sources (collectively, the “Rate Data Sources”), each as \nin effect or as most recently filed with, or issued or approved by, the NY PSC as of the date \nof the applicable annual update: \n(i) the revenue requirement, rate base, depreciation rates, capital structure, cost of \ncapital, return on common equity, and functionalization and allocation"},{"page":21,"startToken":7283,"endToken":7843,"text":"methodologies established in or approved pursuant to Transmission Owner’s most \nrecent electric rate order issued by the NY PSC [in Case No. ______], including \nany joint proposal or multi-year rate plan adopted therein (the “NY PSC Rate \nOrder”), applied to both the transmission and distribution functions comprising \nT/D; \n(ii) Transmission Owner’s annual report filed with the NY PSC, and any \ncompliance, reconciliation, or earnings report submitted by Transmission Owner to \nthe NY PSC under the NY PSC Rate Order, to the extent such filing reports actual \nT/D plant balances, expenses, or other inputs for the most recently completed \nreporting period; and \n(iii) to the extent an input is not separately stated in the sources identified in clauses \n(i) and (ii) above, Transmission Owner’s books and records maintained in the \nordinary course of business in accordance with the uniform system of accounts \nprescribed by the NY PSC for electric corporations and, to the extent consistent \ntherewith, FERC’s Uniform System of Accounts, 18 C.F.R. Part 101, and the \nfunctionalization and allocation methodologies employed in the NY PSC Rate \nOrder. \n(iv) If an input required by this Section 5 is not stated in, or cannot be derived from, \nthe sources identified in clauses (i) through (iii) above for the applicable reporting \nperiod, Transmission Owner shall derive such input from its most recent FERC \nForm No. 1, using the functionalization and allocation methodologies employed in \nthe NY PSC Rate Order, and shall identify such input in the informational statement \nprovided under Section 6(d) of this Appendix B. \nThe incorporation of NY PSC-approved inputs in this Section 5 is solely for the purpose \nof measuring the annual carrying cost of the Identified Upgrades under this Agreement, \nand the Rate Data Sources are incorporated solely as inputs to the formula set forth in this \nAppendix B. Such incorporation shall not (A) constitute a waiver or limitation of FERC’s \njurisdiction over the rates, terms, and conditions of this Agreement under Sections 205 and \n206 of the FPA, as reserved in Section 9.2 of the Agreement, or (B) constitute an assertion \nof FERC jurisdiction over any retail rate established by the NY PSC, in each case subject \nto Article 2 of the Agreement. A change to an input resulting from a NY PSC order issued \nafter the effective date of this Agreement shall be implemented through the annual update \nunder Section 6 of this Appendix B and shall not require a filing with FERC under Section \n205 of the FPA, unless such change modifies the formula set forth in this Appendix B. All \ninputs shall be drawn from the same reporting period and functionalized on a consistent \nbasis. Customer may challenge the computation or application of any input in accordance \nwith Section 6(d) of this Appendix B and Section 9.11 of the Agreement; provided that the \nreasonableness of any input approved by the NY PSC in the NY PSC Rate Order shall not \nbe subject to challenge under this Agreement. \n(c) Total T/D Plant (Denominator). Total T/D Plant shall equal the sum of the following, \neach stated at gross original cost before deduction of accumulated depreciation and \namortization, and limited to plant in service: \n(i) T/D Plant, consisting of transmission plant in service and distribution plant in \nservice, as recorded in the applicable transmission and distribution plant accounts"},{"page":22,"startToken":7843,"endToken":8283,"text":"of the Uniform System of Accounts and reported in Transmission Owner’s FERC \nForm No. 1; and \n(ii) T/D Related Intangible and General Plant, consisting of intangible plant and \ngeneral plant functionalized to the transmission and distribution functions using the \nallocation factors employed in the Rate Data Sources. \n(d) Total T/D Investment Base. The Total T/D Investment Base, which forms the basis \nfor the return component described in Section 5(e)(i) of this Appendix B, shall be \ndetermined as follows: \n(i) Net Investment, equal to Total T/D Plant, less the T/D related accumulated \nprovision for depreciation and amortization, less the T/D related accumulated \ndeferred income taxes (net of associated deferred tax assets), and plus or minus \nother regulatory assets and regulatory liabilities includable in rate base under the \nRate Data Sources; plus \n(ii) T/D Prepayments (Account 165) and T/D Materials and Supplies (Account \n154), each as functionalized to the transmission and distribution functions; less \n(iii) T/D Related Cash Working Capital, determined in accordance with the cash \nworking capital methodology employed in the Rate Data Sources. \n(e) Total T/D Revenue Requirements Allocable (Numerator). Total T/D Revenue \nRequirements Allocable shall equal the sum of the following components, each \nfunctionalized to the transmission and distribution functions in accordance with the Rate \nData Sources: \n(i) Return and Associated Income Taxes, equal to the Total T/D Investment Base \nmultiplied by Transmission Owner’s weighted average cost of capital, reflecting \nthe capital structure, embedded cost of long-term debt, cost of preferred stock (if \nany), and return on common equity most recently approved or accepted for \nTransmission Owner by the NY PSC, grossed up for federal and state income taxes \nat the applicable statutory rates; \n(ii) T/D Depreciation and Amortization Expense, equal to the depreciation and \namortization expense recorded for T/D Plant and T/D Related Intangible and \nGeneral Plant, calculated using the depreciation rates most recently approved or \naccepted for Transmission Owner by the applicable regulatory authority; \n(iii) T/D Related Municipal Tax Expense, equal to the real property and other \nmunicipal taxes recorded as taxes other than income taxes (Account 408.1) and \nattributable to the transmission and distribution functions; \n(iv) T/D Related Payroll Tax Expense, equal to the payroll taxes recorded as taxes \nother than income taxes (Account 408.1) and allocated to the transmission and \ndistribution functions; \n(v) T/D Operation and Maintenance Expense, equal to the transmission and \ndistribution operation and maintenance expenses recorded in the applicable \nexpense accounts of the Uniform System of Accounts, [excluding any costs \nrecovered through separately stated surcharges, pass-through mechanisms, or \nNYISO charges];"},{"page":23,"startToken":8283,"endToken":8785,"text":"(vi) T/D Related Administrative and General Expense, equal to administrative \nand general expenses (Accounts 920 through 935) allocated to the transmission and \ndistribution functions, excluding any items excluded from recovery under the Rate \nData Sources; less \n(vii) T/D Rents Received from Electric Property, equal to rents from electric \nproperty (Account 454) attributable to the transmission and distribution functions, \nwhich shall be applied as a reduction to the revenue requirement; provided that \nrevenues received by Transmission Owner under this Agreement shall be excluded \nfrom this component. \n6. Annual Update and True-Up \n(a) Annual Update. No later than August 1 of each calendar year during the Contract Term \nand the year immediately following the Contract Term, Transmission Owner shall \nrecalculate the Large Load Upgrade-Specific Capital Revenue Requirement and Annual \nOn-going Charge Factor using the Rate Data Sources then most recently available, and \nshall recalculate the Estimated Annual Revenue Requirement, the Estimated Accelerated \nAnnual Revenue Requirement, the Annual Deferred Revenue, and the monthly Large Load \nUpgrade Charge for the succeeding Billing Year in accordance with Sections 3 and 5 of \nthis Appendix B. Each annual update shall reflect, without limitation, changes during the \nContract Term in Transmission Owner’s approved or accepted return on common equity \nand depreciation rates.  \n(b) Annual True-Up. Because the Annual On-going Charge Factor applied in each Billing \nYear is derived from data for the most recently completed reporting year, the Large Load \nUpgrade Charge billed for each Billing Year shall be an estimate. In the Billing Year \nfollowing each Billing Year, Transmission Owner shall determine the difference between \n(i) the Large Load Upgrade Charge billed for the prior Billing Year and (ii) the Large Load \nUpgrade Charge that would have been billed for that Billing Year using the Annual On-\ngoing Charge Factor, the Large Load Upgrade-Specific Capital Revenue Requirement, and \nLarge Load Upgrade Gross Plant in Service derived from actual data for the corresponding \nperiod. Any resulting over-recovery or under-recovery, together with interest calculated in \naccordance with 18 C.F.R. § 35.19a, shall be refunded to or surcharged to Customer, as \napplicable, in equal monthly installments over the succeeding Billing Year, in accordance \nwith the accounting protocols set forth in Appendix C. \n(c) Replacement of Estimated Costs. Upon completion of the Final Cost Reconciliation \nProtocol set forth in Section 1 of Appendix C, the actual Reimbursable Costs of each \nIdentified Upgrade shall replace the Estimated Network Upgrade Book Value for all \npurposes of this Appendix B. Transmission Owner shall recalculate the Large Load \nUpgrade Charge prospectively and shall true up all amounts billed from the \nCommencement Date, with interest calculated in accordance with 18 C.F.R. § 35.19a. \n(d) Informational Statement. Concurrently with each annual update, Transmission \nOwner shall provide Customer with a written statement setting forth the recalculated \nAnnual On-going Charge Factor, Large Load Upgrade-Specific Capital Revenue \nRequirement, and Large Load Upgrade Gross Plant in Service, and each input used to \ndetermine those amounts, the specific Rate Data Source and account or line reference from"},{"page":24,"startToken":8785,"endToken":9216,"text":"which each input was derived, the true-up calculation for the prior Billing Year, and the \nrevised schedule under Section 4 of this Appendix B, together with supporting workpapers. \nTransmission Owner may use such statement to satisfy any reporting or posting obligations \nunder the NYISO OATT or applicable FERC or NY PSC requirements. Customer may \nreview and challenge any annual update in accordance with Section 9.11 of the Agreement. \n(e) Expiration of Contract Term. Following the final annual true-up for the last Billing \nYear of the Contract Term, no further updates or true-ups of the Large Load Upgrade \nCharge shall be performed under this Agreement. Any over-recovery or under-recovery \nattributable to changes in the inputs to the Annual On-going Charge Factor occurring in \nthe year after the expiration of the Contract Term shall be addressed in Transmission \nOwner’s rate proceedings before FERC or the NY PSC, as applicable, and shall not be \nbilled to or refunded to Customer. \n(f) No Double Recovery. Nothing in this Appendix B shall permit Transmission Owner to \nrecover, through FERC-jurisdictional wholesale transmission rates or NY PSC-\njurisdictional retail delivery rates, any revenue requirement associated with the Identified \nUpgrades that has been recovered from Customer under this Agreement, consistent with \nthe NYISO OATT. \n(g) Early Termination. In the event of termination prior to the expiration of the Assessment \nPeriod, the Net Present Value Residual Charge under Section 4.3 of the Agreement shall be \ncalculated net of the accumulated Annual Deferred Revenue collected from Customer through \nthe date of termination. \n \n7. TO Attachment Facilities Cost Recovery Special Provisions \n \nAny alternative cost recovery arrangement for the TO Attachment Facilities agreed to by the \nParties shall be set forth in this Section 7 and shall, at a minimum, specify: (i) the capital \npayment amount and schedule; (ii) the exclusion of amounts so paid from the revenue \nrequirement and the Large Load Upgrade Charge; (iii) the income tax treatment, including any \ngross-up and true-up; (iv) the treatment of operation, maintenance, repair and replacement costs \nduring and after the Term; (v) any resulting adjustments to security under the Large Load \nSecurity Agreement; and (vi) treatment upon termination. Transmission Owner shall make any \nsuch arrangement available on a non-discriminatory basis to similarly situated customers. If the \nParties exercise their rights under this Section 7, Transmission Owner shall file this Agreement, \nor any amendment under Section 9.6 adding or changing this Section 7, with FERC, and such \nterms shall not take effect until accepted by FERC. If FERC does not accept such terms, the \ndefault treatment under Section 4.4 shall apply."},{"page":25,"startToken":9216,"endToken":9393,"text":"APPENDIX C: TRUE-UP AND ANNUAL REVENUE \nCREDITING ACCOUNTING PROTOCOLS \n1. Final Cost Reconciliation Protocol \n(a) Within one hundred eighty (180) days after the COD, Transmission Owner shall \nassemble all direct work orders, material invoices, internal payroll overheads, and \nAFUDC computations recorded in accordance with FERC’s Uniform System of \nAccounts (18 C.F.R. Part 101) and NY PSC accounting guidelines. \n(b) A formal accounting statement detailing any variance between the preliminary \nestimates in Appendix B and actual Reimbursable Costs will be submitted to Customer \nand NY PSC Staff. \n(c) Billing adjustments or refunds shall be processed within thirty (30) days thereafter. \n2. Revenue Crediting and Prevention of Cost Shifting \n(a) Revenue Crediting: All funds collected from Customer toward the carrying charges or \ncapital costs of the Identified Upgrades shall be credited or otherwise reflected in \nTransmission Owner’s applicable wholesale transmission revenue requirement or retail \nrate base, as appropriate, consistent with Article 2 and the NYISO OATT, so that non-\nparticipating wholesale and retail customers are insulated from the capital and operating \ncosts of the dedicated Identified Upgrades."},{"page":26,"startToken":9393,"endToken":9426,"text":"APPENDIX D: PAYMENT INFORMATION AND ADDRESSES \nFOR NOTICES AND BILLING  \n[Transmission Owner insert wire/electronic payment information and mailing address for \nnotices] \n[Customer insert wire/electronic payment information and mailing address for notices]"}],"sections":[{"p":1,"at":0,"title":"Attachment E","method":"printed heading","endPage":3,"endAt":0,"startToken":0,"endToken":40},{"p":3,"at":0,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":26,"endAt":256,"startToken":40,"endToken":9426}]}