{"document":{"slug":"rec-20261116-5335-3","title":"Att F Pro Forma LL Security Agreement","issued":"2026-11-16","accession":"20261116-5335","docket":"ER27-529-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"New York Independent System Operator, Inc.Central Hudson Gas & Electric CorporationNew York State Electric & Gas Corporation ,Rochester Gas and Electric Corporation ,Niagara Mohawk Power Corporation ,Consolidated Edison Company of New York, Inc. ,Orange and Rockland Utilities, Inc. ,","kind":"attachment","file":"sources/filings/text/20261116-5335_007.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5335","tier":"record","parent":"rec-20261116-5335","sha256":"c8f74d1478cfacecbb20b87c0e315666b4004f701b68634218d4ca2589342c87","pages":18,"tokens":5524,"emptyPages":[],"textThemes":["credit","cost","study"]},"pages":[{"page":1,"startToken":0,"endToken":8,"text":"Attachment F \nPro Forma Large Load Security Agreement"},{"page":2,"startToken":8,"endToken":37,"text":"44.16.10 Appendix 10 to Attachment LL – Pro Forma Security Agreement \n \nPRO FORMA LARGE LOAD SECURITY AGREEMENT \nBETWEEN \n[NEW YORK TRANSMISSION OWNER] \n(Transmission Owner) \nAND \n[CUSTOMER NAME] \n(Customer)"},{"page":3,"startToken":37,"endToken":77,"text":"TABLE OF CONTENTS \nRecitals \nArticle I: Definitions \nArticle II: Security \nArticle III: Term \nArticle IV: Notices \nArticle V: Miscellaneous \n• Schedule 1: Project Security Amount and Posting Schedule \n• Attachment A: Form of Irrevocable Standby Letter of Credit \n• Attachment B: Related Agreement"},{"page":4,"startToken":77,"endToken":467,"text":"PRO FORMA \nLARGE LOAD SECURITY AGREEMENT \nThis LARGE LOAD SECURITY AGREEMENT (this “Agreement”) is made and entered into \nas of the [___] day of [_______], 20[__] (the “Effective Date”) by and between: \n• [NEW YORK TRANSMISSION OWNER] (“Transmission Owner” or “Connecting \nTransmission Owner” or “Affected Transmission Owner”), a [corporation] organized and \nexisting under the laws of the State of New York, having an office and place of business at \n[_________]; and  \n• [CUSTOMER NAME] (“Customer”), a [corporation/ limited liability company] \norganized under the laws of the State of [_____], having an office and place of business at \n[______], and owning a Large Load Facility with an expected peak demand at the Point of \nInterconnection.  \nTransmission Owner and Customer are collectively referred to as the “Parties,” and each \nindividually as a “Party.” \nRECITALS \nWHEREAS, Customer has submitted a Large Load Integration Request to interconnect or serve \na Large Load Facility with an aggregate demand equal to or exceeding fifty megawatts (50 MW) \nat a transmission-system interconnection point with the Transmission Owner’s service territory or \naffecting the Affected Transmission Owner’s transmission facilities in New York State;  \nWHEREAS, New York Independent System Operator, Inc. (“NYISO”) and/or Transmission \nOwner have performed [system reliability impact studies, facility studies, and/or engineering \nassessments] pursuant to the NYISO Open Access Transmission Tariff (“OATT”), identifying that \nthe interconnection and commercial operation of Customer’s Large Load Facility will necessitate \nthe construction and placement into service of certain Network Upgrades and/or TO Attachment \nFacilities on the Transmission Owner’s transmission system to maintain electric system reliability \nand system adequacy; and  \nWHEREAS, Customer has received the initial cost allocation estimate for Network Upgrades \nand/or TO Attachment Facilities identified by System Impact Studies and any applicable Facilities \nStudies under Attachment LL of the NYISO OATT or successor tariff provisions needed to \ninterconnect Customer’s Large Load Facility; \nWHEREAS, Customer is required to post security to Transmission Owner in the initial amount \nof [      ] Dollars ($[     ]), (the “Initial Project Security Amount”), consistent with Attachment \nLL of the NYISO OATT;  \nWHEREAS, the Initial Project Security Amount is subject to adjustment in accordance with the \nInterconnection Cost Allocation Process as set forth in Section [__] of Attachment LL of the \nNYISO OATT (the “Project Security Amount”);  \nWHEREAS, the Project Security Amount may thereafter be adjusted pursuant to the Large Load \nCost Recovery Agreement (“CRA”), into which Customer has entered or will enter and pursuant"},{"page":5,"startToken":467,"endToken":945,"text":"to which it will agree to pay for all of Transmission Owner’s costs associated with the development \nof Network Upgrades and/or TO Attachment Facilities;  \nWHEREAS, Customer’s obligations to post Security under this Agreement shall be set forth in \nSchedule 1;  \nWHEREAS, Customer may also enter into a Large Load Interconnection Agreement or other \napplicable agreement(s) governing, among other things, the construction of the Network Upgrades \nand/or TO Attachment Facilities; and  \nWHEREAS, the Parties desire to set forth in this Agreement the terms governing the posting, \nmaintenance, adjustment, application and release of such Security. \nNOW, THEREFORE, in consideration of the premises and for other good and valuable \nconsideration, the receipt and sufficiency of which are hereby acknowledged, and with the intent \nto be legally bound, the Parties agree as follows: \nARTICLE I: DEFINITIONS \n1.0 \nDefined Terms. Capitalized terms used but not defined in this Agreement have the \nmeanings given in the NYISO OATT, NYISO Market Services Tariff, or, if not defined \ntherein, in the CRA or applicable Large Load Interconnection Agreement, if those \nagreements are in effect.  \n1.1  \n“Abandon” means Customer’s (i) failure to issue a notice to proceed for Transmission \nOwner to commence construction of the Project Facilities within [six (6)] months after the \napplicable construction commencement milestone set forth in Exhibit D of the Large Load \nInterconnection Agreement, or (ii) suspension of, or causing the suspension of, \nconstruction of the Project Facilities for a period of [three (3)] years, which, in either case, \nis not due to an event of Force Majeure; provided that if Force Majeure causes such failure \nor suspension, Customer shall nevertheless be deemed to have abandoned construction if \nit fails to commence or resume construction within [six (6)] months after the end of the \nForce Majeure event (unless Customer has elected to continue such suspension for a total \nsuspension period not exceeding [three (3)] years in accordance with the Large Load \nInterconnection Agreement or CRA). \n1.2  \n“Affiliate” means, with respect to a person or entity, any other person or entity directly or \nindirectly controlling, controlled by, or under common control with such person or entity. \n“Control” means the possession, directly or indirectly, of the power to direct the \nmanagement or policies of a person or entity; a voting interest of ten percent (10%) or more \ncreates a rebuttable presumption of control. \n1.3  \n“Business Day” means any day except Saturday, Sunday, a U.S. federal legal holiday, or \na day on which banking institutions in the State of New York are authorized or required by \nlaw or other governmental action to close. \n1.4 \n“Cash” means readily available United States dollars delivered by wire transfer in \naccordance with Transmission Owner’s written instructions.  Transmission Owner’s \nwritten instructions can be delivered via email or other means of electronic communication.  \n1.5  \n“CRA” means the Large Load Cost Recovery Agreement."},{"page":6,"startToken":945,"endToken":1450,"text":"1.6  \n“Credit Rating” means, with respect to an entity on any date of determination, the rating \nassigned to that entity’s unsecured, senior long-term debt (not supported by third-party \ncredit enhancement) or its corporate credit rating, whichever is lower, by S&P or Moody’s. \nIf the entity is rated by both S&P and Moody’s, the lower rating controls; if it is rated by \nonly one, that rating controls. For a financial institution that is the issuer of a letter of credit \nhereunder, the applicable rating is its long-term deposit rating or senior unsecured, \nunsubordinated long-term debt rating, as applicable. \n1.7  \n“Creditworthy Rating” means a Credit Rating of at least the threshold selected in \nSchedule 1: [as acceptable to the Transmission Owner]. \n1.8  \n“Cure Period” means the applicable notice and cure period under the relevant Related \nAgreement and, with respect to this Agreement, five (5) Business Days after Transmission \nOwner’s written notice. \n1.9  \n“Event of Default” means an Event of Default under the CRA or a Default under the Large \nLoad Interconnection Agreement. \n1.10  “FERC” means the Federal Energy Regulatory Commission. \n1.11 \n“Force Majeure” means any event or circumstance beyond a Party’s reasonable control \nthat prevents the Party from performing an obligation, is not the result of the negligence or \nintentional wrongdoing of such Party, and could not have been prevented or mitigated by \nthe exercise of Good Utility Practice (in the case of the Transmission Owner) or due \ndiligence (in the case of Customer), including acts of God, fire, flood, storm, lightning, \nexplosion, breakage of or accident to machinery, epidemic or pandemic, cyber-attack \n(except to the extent caused by or resulting from Customer’s failure to comply with its \nobligations under this Agreement), sabotage, terrorism, war, civil disturbance, strikes and \nlabor disturbances, acts or orders of any Governmental Authority, and curtailment or \ninterruption directed by NYISO for reliability reasons. Force Majeure shall not include, \nwith respect to Customer: (a) economic hardship, changes in market conditions, or the cost \nor unavailability of financing; (b) delays in Customer’s procurement of equipment or \nfailure of Customer’s suppliers or contractors, unless caused by an independent Force \nMajeure event; (c) labor disputes involving only Customer’s or its contractors’ workforce; \n(d) Customer’s failure to obtain required permits or approvals, unless it has diligently and \ntimely pursued them; or (e) changes in the demand for, or the business case of, the Large \nLoad Facility’s end use. Interruptions resulting from the Single Contingency Design shall \nnot be treated as Force Majeure. Force Majeure shall not excuse the failure to make \npayments when due or to timely post or maintain the Security. \n1.12 \n“Customer’s Obligations” means Customer’s obligations commencing with the facility \nstudy estimated costs assigned to the Large Load subject to adjustment through the \nInterconnection Cost Allocation Process until the execution of the CRA, at which point the \nsecurity amount and adjustments thereto shall be based on the Customer’s remaining \npayment obligations under the CRA.  \n1.13 \n“Draw Event” has the meaning given in Section 2.4."},{"page":7,"startToken":1450,"endToken":1986,"text":"1.14 \n“Interconnection Cost Allocation Process” means the process by which the final \nestimated costs are allocated to Customer, as may be incorporated into NYISO’s or \nTransmission Owner’s procedures.  \n1.15 \n“Large Load Facility” has the meaning given in the CRA and is the “Load Facility” under \nthe Large Load Interconnection Agreement. \n1.16 \n“Letter of Credit” means an irrevocable standby letter of credit substantially in the form \nof Attachment A, issued by a U.S. commercial bank, a U.S. branch of a foreign commercial \nbank, or the U.S. subsidiary of a foreign commercial bank, in each case with counters in \nNew York, that (i) is subject to the jurisdiction of the New York federal or state courts, (ii) \nif a foreign bank, is compliant with 12 C.F.R. Part 252 (Regulation YY), (iii) has assets of \nat least [$1,000,000,000], and (iv) has a Credit Rating of at least [“A-” from S&P and “A3” \nfrom Moody’s] (the “Minimum Issuer Rating”); provided that if the bank is rated by only \none of those agencies and the bank is approved in writing by an authorized representative \nof Transmission Owner, only the Minimum Issuer Rating for that agency must be satisfied. \nEach Letter of Credit shall have an expiration date at least twelve (12) months after its date \nof issuance or renewal and shall be renewed, replaced, extended and maintained until the \nSecurity Release Date. All Letter of Credit costs shall be borne by Customer. \n1.17 \n“Moody’s” means Moody’s Investors Service, Inc. or its successor. \n1.18 \n“Network Upgrades”: Additions, modifications, enhancements, or replacements to the \nTransmission Owner’s electric transmission system required at or beyond the Point of \nInterconnection to accommodate the Customer’s Large Load Facility reliably under \nNERC, NPCC, NYSRC, and Transmission Owner reliability criteria and identified through \nthe Large Load Interconnection Procedures contained at Attachment LL of the NYISO \nOATT (or successor tariff provisions) and set forth in [the CRA, the Large Load \nInterconnection Agreement, and/or other applicable agreement], for which Customer is \nproviding Security under this Agreement.  \n1.19 \n“Project Facilities” means the Network Upgrades and TO Attachment Facilities for which \nCustomer is providing Security under this Agreement. \n1.20 \n“Related Agreements” means, collectively, the CRA, the Large Load Interconnection \nAgreement, and any other agreements listed in Attachment B.  \n1.21  “S&P” means S&P Global Ratings or its successor. \n1.22 \n“Security” means (a) Cash, (b) one or more Letters of Credit, or (c) any combination of \nthe foregoing, provided and maintained in accordance with this Agreement; and, with \nrespect to any increase or decrease in the Security Amount, Cash, a substitute Letter of \nCredit, or an amendment to a previously delivered Letter of Credit, unless otherwise agreed \nin writing by Transmission Owner. \n1.23 \n“Security Amount” means, on any date, the Initial Project Security Amount or Project \nSecurity Amount, as increased or reduced in accordance with Sections 2.6 and 2.7. \n1.24 \n“Security Posting Date” means each date set forth in Schedule 1 and each other date on \nwhich Customer is required to post, replace or increase Security, or on which a reduction \nin the Security Amount becomes effective under this Agreement."},{"page":8,"startToken":1986,"endToken":2500,"text":"1.25 \n“Security Release Date” has the meaning given in Section 2.5. \n1.26 \n“TO Attachment Facilities”: All facilities and equipment owned or controlled by \nTransmission Owner between the Point of Interconnection and the Point of Change of \nOwnership that are constructed or modified for the purpose of interconnecting the Large \nLoad Facility, including line taps, breakers, disconnect switches, bus work, metering \ninstrument transformers (if owned by Transmission Owner), System Protection Facilities \nat a Transmission Owner substation, and associated civil and structural works, as described \nin [the Large Load Interconnection Agreement or other applicable agreement], for which \nCustomer is providing Security under this Agreement. \nARTICLE II: SECURITY \n2.1 \nPosting and Maintenance of Security. On or before each Security Posting Date, \nCustomer shall provide Transmission Owner Security for Customer’s Obligations in the \nthen-applicable Security Amount, and Customer shall maintain Security in the Security \nAmount at all times until the Security Release Date. Cash shall be wired to Transmission \nOwner in accordance with Transmission Owner’s written instructions delivered at least \nfive (5) Business Days before the applicable Security Posting Date; if Transmission Owner \ndelivers its instructions later, Customer’s deadline shall be extended until two (2) Business \nDays after receipt of the instructions. Each Letter of Credit shall be in form and substance \nacceptable to Transmission Owner. Customer shall provide a draft of each Letter of Credit \nto Transmission Owner for review at least five (5) Business Days before the applicable \nSecurity Posting Date. Transmission Owner shall have the opportunity to verify that the \nissuing bank satisfies the requirements of this Agreement, and the original Letter of Credit \nshall be delivered to Transmission Owner by hand delivery or overnight mail. \n(a)  \nThe Initial Project Security Amount shall be established by reference to the initial \ncost estimate for Network Upgrades and/or TO Attachment Facilities identified by \nSystem Impact Studies and Facilities Studies under Attachment LL of the NYISO \nOATT or successor tariff provisions. This amount shall be entered at Schedule 1.  \n(b)  \nThe Security Amount shall be adjusted as prescribed in Sections 2.5, 2.6 and 2.7 of \nthis Agreement and Article 6 of the CRA.  \n2.2 \nLetter of Credit Renewals and Replacements; Downgrades.  \n(a) \nRenewal. If a Letter of Credit is scheduled to expire before the Security Release \nDate, Customer shall renew or replace it no later than ninety (90) days before its \nexpiration. If the issuing bank gives a non-extension notice, Customer shall provide \nacceptable replacement Security within five (5) Business Days after receiving that \nnotice and in all events before the Letter of Credit expires. The renewed or \nreplacement Letter of Credit shall expire no earlier than the later of (i) one (1) year \nafter its issuance or renewal and (ii) the Security Release Date. Customer shall send \nevidence of the renewed or replaced Letter of Credit from the issuing bank to \nTransmission Owner within five (5) Business Days after renewal or replacement. \n(b) \nIssuer Downgrade. If an issuing bank fails to maintain the Minimum Issuer Rating \n(an “Issuer Downgrade”), Customer shall deliver a substitute Letter of Credit within"},{"page":9,"startToken":2500,"endToken":2975,"text":"five (5) Business Days after the Customer knew or should have known of the Issuer \nDowngrade. \n(c) \nReturn of Replaced Letter of Credit. Upon receipt and acceptance of a substitute \nor replacement Letter of Credit, Transmission Owner shall, within five (5) Business \nDays after Customer’s request, return the replaced Letter of Credit to the issuing \nbank and notify Customer, unless Transmission Owner has drawn on it or a Draw \nEvent is continuing. \n• 2.3 \nSubstitution of Security. If Customer replaces Cash with a Letter of Credit, or \nreplaces a Letter of Credit with Cash or a Letter of Credit, in each case in an amount at \nleast equal to the then-applicable Security Amount, Transmission Owner shall, within \nthirty (30) calendar days after receipt of the replacement Security, refund the replaced Cash \nor return the replaced Letter of Credit, as applicable, unless a Draw Event has occurred and \nis continuing. During any period in which Transmission Owner holds Security exceeding \nthe Security Amount, Transmission Owner shall not apply, set off or draw on Security in \nan amount greater than the Security Amount. Cash refunds shall be made by wire in \naccordance with Customer’s written instructions delivered at least two (2) Business Days \nbefore the wire. \n2.4 \nDraw Events. Transmission Owner may apply, set off and/or draw on the Security, up to \nthe outstanding Security Amount, upon the occurrence of any of the following (each, a \n“Draw Event”): \n(a) \nCustomer notifies Transmission Owner in writing that it is ceasing to negotiate, or \nfails, within a reasonable period of time, to enter into the CRA, the Large Load \nInterconnection Agreement, or other applicable agreements, and either NYISO or \nthe Transmission Owner has informed Customer in writing that the Project \nFacilities must be completed because they are included in the NYISO base case, \nTransmission Owner’s local transmission plan, or the NYISO’s Reliability Needs \nAssessment or Short-Term Assessment of Reliability or another interconnection \nrequest relies on completion of the Network Upgrades or TO Attachment Facilities; \n[(b)  \nCustomer notifies Transmission Owner in writing that it is ceasing to negotiate, or \nfails, within a reasonable period of time, to enter into the CRA, the Large Load \nInterconnection Agreement, or other applicable agreements, and NYISO or \nTransmission Owner has determined that the Project Facilities are not needed, to \nthe extent of costs to restore the New York State Transmission System to a safe and \nreliable condition;] \n(c) \nAn Event of Default has occurred under any Related Agreement and any applicable \nCure Period has expired; \n(d) \nCustomer Abandons the Large Load Facility or a material portion of it, and the \nabandonment continues for thirty (30) days after Transmission Owner’s written \nnotice to Customer; \n(e)  \nCustomer fails to pay any amount, or any amount finally determined to be due, \nwhen due, under the CRA, and the failure continues beyond any applicable Cure \nPeriod;"},{"page":10,"startToken":2975,"endToken":3434,"text":"(f)  \nThe CRA has terminated prior to the expiration of the Assessment Period \nthereunder; \n(g) \nA Letter of Credit will expire in thirty (30) days or less, or an earlier period required \nby Section 2.2(a), and Customer has not renewed or replaced it as required by \nSection 2.2(a); \n(h) \nCustomer fails to deliver substitute or replacement Security within the time required \nby Section 2.2(b); \n(i) \nCustomer fails to comply with a material term of this Agreement, or defaults under \na material term of any Related Agreements, and the failure continues beyond any \napplicable Cure Period after Transmission Owner’s written notice describing the \ndefault; or \n(j) \nTransmission Owner is otherwise entitled to draw on Security under any Related \nAgreement. \nUpon a Draw Event, Transmission Owner may draw on or make demand under any or all of the \nSecurity without further notice to Customer. If Transmission Owner draws before it incurs the \nrelated costs, it shall hold the proceeds as Cash Security and apply them only to Customer’s \nObligations in accordance with Section 2.5. Customer shall remain liable for all Customer’s \nObligations that remain unpaid after application of the Security. \n2.5  \nApplication and Release of Security. Transmission Owner may apply any or all of the \nSecurity to Customer’s Obligations, including amounts owed by Customer to complete the \nProject Facilities or restore the New York State Transmission System to a safe and reliable \ncondition. Upon a Draw Event, Transmission Owner shall apply the drawn funds (the \n“Funds”) to then-outstanding Customer’s Obligations and shall retain any Funds exceeding \nthose obligations (“Excess Proceeds”) as security for future Customer’s Obligations. \nWithin thirty (30) calendar days after the latest of the following dates (the “Security \nRelease Date”), Transmission Owner shall refund any unapplied Cash and Excess Proceeds \nto Customer, and/or return any unapplied Letter of Credit to the issuing bank: \n(i)  \nthe date on which all of Customer’s obligations under the Related Agreements have \nbeen satisfied; \n(ii)  \nthe date on which the portions of the New York State Transmission System affected \nby construction of the Project Facilities have been restored to a safe and reliable \ncondition, as confirmed in writing by NYISO or Transmission Owner, and all \nassociated costs have been paid, as applicable, and all of Customer’s obligations \nunder the Related Agreements have been satisfied (the “Restoration Completion \nDate”); or  \n(iii)  \nthe date on which Transmission Owner or NYISO confirms in writing that the \nProject Facilities are no longer required, Customer has paid all outstanding \nobligations, neither Party has any current or future obligation to restore the New \nYork State Transmission System or to install or complete any Project Facilities, and \nall of Customer’s obligations under the Related Agreements have been satisfied \n(the “Obligation Termination Date”)."},{"page":11,"startToken":3434,"endToken":3981,"text":"Cash refunds shall be wired to Customer in accordance with Customer’s written instructions \ndelivered at least two (2) Business Days before the wire. Any interest earned on Cash Security or \nExcess Proceeds shall be for the account of Transmission Owner. Notwithstanding Section 9-207 \nof the New York Uniform Commercial Code and to the extent permitted by applicable law, \nTransmission Owner may invest, use, commingle or otherwise dispose of Cash Security and \nExcess Proceeds, subject to its obligations to apply or return those amounts under this Agreement. \n2.6 \n Reduction or Increase of Security Amount as a Result of the Interconnection Cost \nAllocation Process and/or the CRA. \nCustomer must timely post Security in the Initial Project Security Amount, subject to \nadjustment based on the Interconnection Cost Allocation Process in effect at the time of \nthe Facilities Study. The Interconnection Cost Allocation Process shall provide the \nprocedures pursuant to which cost allocations are adjusted when projects fail timely to post \nsecurity following the release of the Facilities Studies until all remaining projects in the \nCluster have posted required security. Required Security may also be adjusted upon \nexecution of the CRA and adjusted annually thereafter to provide security for Customer’s \nobligations under the CRA for the remaining term. \nIf Customer provided a Letter of Credit as Security, the annual adjustment may occur at \nthe time of renewal of the Letter of Credit by amendment or replacement of the Letter of \nCredit. If Customer provided Cash as Security, the annual adjustment shall be effectuated \nthrough either an increase in the Cash provided by Customer or a refund of Cash held by \nTransmission Owner. Within ten (10) Business Days after Customer’s written request \nfollowing a reduction of the Security Amount, Transmission Owner shall refund by wire \nany Cash exceeding the adjusted Security Amount or return any replaced Letter of Credit \n(provided Customer has delivered a substitute Letter of Credit or amendment in the \nadjusted Security Amount) to the issuing bank. Changes to Schedule 1 under this Section \nshall not constitute an amendment of this Agreement. \n2.7 \nAdjustment of Security Amount as a result of Change in Scope or Extension Request. \nThe Security Amount shall be adjusted for reasons including but not limited to the \nfollowing occurrences, and in each case as may be reflected in an amendment to the Large \nLoad Interconnection Agreement and/or CRA: \n(i)  \nChange in Scope. If the scope of the Project Facilities is modified, expanded or \notherwise changed from the scope described in the Large Load Interconnection \nAgreement, CRA, or other applicable agreements, including as a result of a Material \nModification or an Exceedance Event under the Large Load Interconnection \nAgreement or updated engineering or design requirements, the Security Amount \nshall be adjusted by the amount of the change in Customer’s allocated share of the \ncosts of the Project Facilities attributable to that change. Transmission Owner shall \nprovide Customer with a written calculation of the adjustment. \n(ii)  \nExtension Request; Suspension or Delay. If Customer requests an extension of \nany milestone date in the Large Load Interconnection Agreement, CRA, or other \napplicable agreements, or suspends or delays performance under Section 3.3 of the \nCRA, and the extension, suspension or delay results in additional costs to \nTransmission Owner under the Large Load Interconnection Agreement or CRA,"},{"page":12,"startToken":3981,"endToken":4482,"text":"the Security Amount shall be increased by the amount of those additional costs, as \nreasonably documented by Transmission Owner. Transmission Owner shall not \nrequire the increased Security Amount earlier than five (5) Business Days after \ndelivering that documentation to Customer. \nOn the applicable Security Posting Date for an adjustment, Customer shall post additional Security \nin a form permitted by Section 2.1 if the Security Amount increases, or Transmission Owner shall \ntake the actions described in Section 2.6 if the Security Amount decreases. Any increased Security \nAmount remains subject to reduction under Section 2.6. \nARTICLE III: TERM \n3.1 \nTerm. This Agreement is effective as of the Effective Date and continues until the later of \n(i) the Security Release Date and (ii) the date on which Transmission Owner has returned \nor released all unapplied Security to Customer in accordance with Section 2.5. Rights and \nobligations that by their nature survive expiration or termination shall so survive.  \nARTICLE IV: NOTICES \n4.1 \nNotices. Notices shall be in writing and delivered by hand, United States mail, overnight \ncourier, or email (provided that an email notice is also delivered by one of the other \nmethods). Notices are effective on receipt. A Party may change its address by notice given \nin accordance with this Section. \nIf to Transmission Owner: [Name], [Address], Attn: [Treasurer / Vice President], \nPhone: [___], Email: [___]; with a copy to: [Address], Attn: General Counsel. \nIf to Customer: [Name], [Address], Attn: [___], Phone: [___], Email: [___]. \nARTICLE V: MISCELLANEOUS \n5.1 \nRepresentations and Warranties. As of the Effective Date, each Party represents and \nwarrants to the other that: (i) it is duly organized, validly existing and in good standing \nunder the laws of its jurisdiction of formation; (ii) it has all regulatory authorizations \nnecessary to perform its obligations under this Agreement; (iii) its execution, delivery and \nperformance of this Agreement are within its powers, have been duly authorized, and do \nnot violate its governing documents or, in any material respect, any contract to which it is \na party or any applicable law; and (iv) this Agreement is its legal, valid and binding \nobligation, enforceable in accordance with its terms, subject to bankruptcy, insolvency and \nsimilar laws and to general principles of equity. \n5.2  \nAssignment. This Agreement may be assigned by a Party only with the other Party’s \nwritten consent, not to be unreasonably withheld, conditioned, or delayed; provided that \n(a) Transmission Owner may assign without consent to an Affiliate or successor with the \nlegal authority and operational ability to perform; (b) Transmission Owner may assign \nwithout consent in connection with a sale, merger, restructuring, or transfer of all or \nsubstantially all of its assets, including the Project Facilities, if the assignee assumes in \nwriting all obligations hereunder; and (c) Customer may assign without consent for \ncollateral security purposes to aid in financing the Large Load Facility, upon prompt notice \nto Transmission Owner. Any assignment by Customer (other than a collateral assignment) \nand any change of control of Customer shall require Transmission Owner’s prior written"},{"page":13,"startToken":4482,"endToken":4982,"text":"consent, not to be unreasonably withheld, conditioned, or delayed, and shall be conditioned \non (i) the assignee assuming in writing all obligations under this Agreement and the Related \nAgreements; (ii) the assignee posting replacement Security under this Agreement before \nthe assignment becomes effective and having a Credit Rating equal to or greater than that \nof Customer as of the date of assignment or providing such additional Security under this \nAgreement as Transmission Owner reasonably requires; and (iii) Customer reimbursing \nTransmission Owner’s reasonable costs of administering the assignment or performing due \ndiligence with respect to a change in control, including reissuing invoices and amending \nrelated contracts. Any financing obtained by Customer shall require the secured party to \nnotify Transmission Owner before exercising assignment rights and to demonstrate \ncompliance with Section 6.2 and Article 18 of the Large Load Interconnection Agreement. \nAny assignment in violation of this Section is void. No assignment by Customer shall \nrelease Customer or any existing Security until the assignee’s replacement Security has \nbeen posted and accepted. No assignment shall relieve a Party of, or enlarge, its obligations. \n5.3 \nGoverning Law. THIS AGREEMENT AND THE RIGHTS AND DUTIES OF THE \nPARTIES HEREUNDER SHALL BE GOVERNED BY AND CONSTRUED, \nENFORCED AND PERFORMED IN ACCORDANCE WITH THE LAWS OF THE \nSTATE OF NEW YORK, WITHOUT REGARD TO PRINCIPLES OF CONFLICTS OF \nLAW. \n5.4 \nFERC, the OATT, and Related Agreements Compliance. The Parties shall comply with \nall applicable filing, acceptance, and effectiveness requirements under Federal Power Act \nSection 205, the OATT, and Related Agreements. No amendment or waiver that is required \nto be filed with and accepted by FERC shall be effective before the required filing or \nacceptance, and the Parties shall cooperate in making any required filing. \n5.5 \nCounterparts and Electronic Signatures. This Agreement may be executed in \ncounterparts, each of which is an original and all of which together are one instrument. \nCounterparts and signatures delivered by email in PDF format or through an electronic-\nsignature platform are effective as originals. \n5.6 \nBinding Effect. This Agreement shall be binding upon and inure to the benefit of the \nParties and their successors and permitted assigns.  \n5.7 \nRules of Interpretation. Unless a contrary intention clearly appears: the singular includes \nthe plural; references to any agreement, tariff, or law mean it as amended from time to \ntime; references to Articles, Sections, Schedules, and Attachments are to this Agreement \nunless otherwise indicated with respect to a Related Agreement; “including” means \nincluding without limitation; “hereunder,” “herein” and similar words refer to this \nAgreement as a whole; and “from” means “from and including,” “to” means “to but \nexcluding,” and “through” means “through and including.”   \n5.8 \nSeveral Obligations. The obligations of the Parties are several, and not joint, and not joint \nand several. \n5.9 \nEntire Agreement; Related Agreements. This Agreement and the Related Agreements \nare intended to operate together and shall be interpreted consistently with one another. This \nAgreement, including its Schedule, Attachments, and the Related Agreements, constitutes"},{"page":14,"startToken":4982,"endToken":5380,"text":"the entire agreement of the Parties with respect to its subject matter and supersedes all prior \nunderstandings, oral or written. \n5.10  No Third-Party Beneficiaries; No Partnership. This Agreement does not create rights, \nremedies, or benefits in favor of any person other than the Parties and their successors in \ninterest and, where permitted, their assigns. This Agreement shall not be construed to create \nan association, joint venture, agency relationship, or partnership among the Parties, and no \nParty shall have authority to bind any other Party.  \n5.11 \nWaiver. The failure of a Party to insist on strict performance on any occasion shall not be \na waiver, and no waiver of any breach shall be a continuing waiver or a waiver of any other \nor subsequent breach.  \n5.12  Force Majeure. No Party shall be considered in default of any obligation under this \nAgreement to the extent its performance is prevented or delayed by any event of Force \nMajeure, provided that such Party gives prompt written notice and uses reasonable efforts \nto resume performance; provided that Force Majeure shall not excuse any obligation to pay \nmoney or to post, maintain, renew, replace, or increase Security. \n5.13  Severability. If any provision of this Agreement is finally determined to be invalid or \nunenforceable by a court or Governmental Authority, the remaining provisions shall \ncontinue in full force and effect. \n5.14  Order of Precedence. In the event of a conflict between this Agreement and any Related \nAgreement regarding Security, this Agreement controls; in the event of a conflict regarding \ncosts or charges, the CRA controls. \n5.15  Dispute Resolution; Forum. Any dispute arising out of or relating to this Agreement shall \nbe resolved in accordance with Article 20 and Section 14.3 of the Large Load \nInterconnection Agreement, including the jury waiver set forth therein; provided that no \ndispute resolution proceeding shall delay or restrict Transmission Owner’s right to draw \non or apply Security in accordance with this Agreement. \n5.16  Amendment. This Agreement may be amended by a written instrument signed by both \nParties, subject to any required filing with and acceptance by FERC. \n \nIN WITNESS WHEREOF, and with the intent to be bound, the Parties have caused their duly \nauthorized representatives to execute this Agreement with effect as of the Effective Date, which \nrepresents the date of the last signature to this Agreement. \n[CUSTOMER] \nBy: ______________________________ \nName: ______________________________ \nTitle: ______________________________ \nDate:_______________________________"},{"page":15,"startToken":5380,"endToken":5386,"text":"[TRANSMISSION OWNER] \nBy: ______________________________ \nName: ______________________________ \nTitle: ______________________________ \nDate:_______________________________"},{"page":16,"startToken":5386,"endToken":5463,"text":"SCHEDULE 1 \nProject Security Amount and Posting Schedule \nInitial posting: $[_______] on the Effective Date. \nProject Security Amount: $[_______] \n[Subsequent posting(s): $[_______] on or before [date or milestone].] \nTotal Security Amount following all scheduled postings: $[_______], subject to adjustment under \nSections 2.6 and 2.7. \nCreditworthy Rating threshold: [A- from S&P and A3 from Moody’s for Letter of Credit issuer]. \nPermitted Security form(s): [Cash] [Letter of Credit]. \nProject Facilities covered: [list or reference IA appendix / NYISO study]."},{"page":17,"startToken":5463,"endToken":5511,"text":"ATTACHMENT A1 \nForm of Irrevocable Standby Letter of Credit \n[To be completed by the Transmission Owner and Customer; the Letter of Credit shall be in form \nand substance acceptable to the Transmission Owner]  \n \n1 Each Transmission Owner may require modifications to match its commercially reasonable \nrequirements or standards"},{"page":18,"startToken":5511,"endToken":5524,"text":"ATTACHMENT B  \n[Identify CRA, Large Load Interconnection Agreement and other agreements as needed]"}],"sections":[{"p":1,"at":0,"title":"Attachment F","method":"printed heading","endPage":3,"endAt":0,"startToken":0,"endToken":37},{"p":3,"at":0,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":18,"endAt":0,"startToken":37,"endToken":5511},{"p":18,"at":0,"title":"ATTACHMENT B","method":"printed heading","endPage":18,"endAt":98,"startToken":5511,"endToken":5524}]}