{"document":{"slug":"rec-20261116-5335-4","title":"Att G Pro Forma Facilities Study Agreement","issued":"2026-11-16","accession":"20261116-5335","docket":"ER27-529-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"New York Independent System Operator, Inc.Central Hudson Gas & Electric CorporationNew York State Electric & Gas Corporation ,Rochester Gas and Electric Corporation ,Niagara Mohawk Power Corporation ,Consolidated Edison Company of New York, Inc. ,Orange and Rockland Utilities, Inc. ,","kind":"attachment","file":"sources/filings/text/20261116-5335_008.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5335","tier":"record","parent":"rec-20261116-5335","sha256":"ca1287ba75deeb35f2b9493b2e79a5bd9f60c28cbcefa0d724d8808ecbf0dbed","pages":17,"tokens":5474,"emptyPages":[],"textThemes":["study","cost"]},"pages":[{"page":1,"startToken":0,"endToken":7,"text":"Attachment G \nPro Forma Facilities Study Agreement"},{"page":2,"startToken":7,"endToken":46,"text":"44.16.8 Appendix 8 to Attachment LL – Pro Forma Facilities Study Agreement \n \nPRO FORMA FACILITIES STUDY AGREEMENT \nBETWEEN \n[TRANSMISSION OWNER LEGAL NAME] \n(Transmission Owner) \nAND \n[LARGE LOAD CUSTOMER LEGAL NAME] \n(Large Load Customer) \n[Project Name] – NYISO Queue No. [_____]"},{"page":3,"startToken":46,"endToken":222,"text":"TABLE OF CONTENTS \nRecitals \nSection 1.0: Definitions \nSection 2.0: Performance of Facilities Study \nSection 3.0: Scope of Work \nSection 4.0: Contents of Facilities Study \nSection 5.0: Point of Change in Ownership \nSection 6.0: Large Load Customer’s Responsibilities \nSection 7.0: Study Deposit \nSection 8.0: Study Costs and Invoicing \nSection 9.0: Payment, Refunds and Disputed Amounts \nSection 10.0: Modifications; Mandated Changes \nSection 11.0: Scope of Agreement; Subsequent Agreements \nSection 12.0: Draft Report \nSection 13.0: Comments and Final Report \nSection 14.0: Limitation of Liability \nSection 15.0: Term and Termination \nSection 16.0: Confidentiality \nSection 17.0: Subcontractors or Agents \nSection 18.0: Notices \nSection 19.0: Governing Law; Regulatory Authority \nSection 20.0: Reservation of Rights \nSection 21.0: Miscellaneous \nExhibit A: Information and Required Data to Be Provided by Large Load Customer \nExhibit B: Description of Scope of Work Performed During Facilities Study \nExhibit C: Description of Schedule and Cost Estimate for the Facilities Study \nExhibit D: Preliminary Point of Change in Ownership"},{"page":4,"startToken":222,"endToken":640,"text":"PRO FORMA \nFACILITIES STUDY AGREEMENT \n[Project Name] – NYISO Queue No. [_____] \n \nThis FACILITIES STUDY AGREEMENT (this “Agreement”) is made and entered into as of \nthis [___] day of [_______], 20[__] (the “Effective Date”) by and between [TRANSMISSION \nOWNER LEGAL NAME], a [corporation] organized and existing under the laws of the State of \nNew York, acting in its capacity as either the Connecting Transmission Owner (“CTO”) or an \nAffected Transmission Owner (“ATO”), as applicable, and hereinafter referred to as the \n“Transmission Owner,” and [LARGE LOAD CUSTOMER LEGAL NAME], a [entity type] \norganized and existing under the laws of the State of [_____], hereinafter referred to as the “Large \nLoad Customer.” Transmission Owner and Large Load Customer may be referred to herein \nindividually as a “Party” and collectively as the “Parties.” \nRECITALS \nWHEREAS, Transmission Owner owns, operates, or has responsibility for certain transmission \nfacilities that form part of the New York State Transmission System, including the [[___] kilovolt \n(“kV”) [_____] transmission line or the [_____] Substation located at [Utility Facility Location]] \n(collectively, the “Transmission Owner Facilities”); \nWHEREAS, Large Load Customer is proposing to develop a Large Load Project of approximately \n[___] megawatts (“MW”), together with associated Large Load Customer-owned substation \nfacilities, located at [Project Site], [_____] County, New York (the “Large Load Project”), \nconsistent with the Large Load Integration Request submitted by Large Load Customer to the New \nYork Independent System Operator, Inc. (“NYISO”) and designated [Queue No. _____]; \nWHEREAS, Large Load Customer desires to interconnect the Large Load Project with the New \nYork State Transmission System at the Transmission Owner Facilities; \nWHEREAS, NYISO performed a System Impact Study and is expected to complete and provide \nthe results of the Assessment of Load Integration Report (“ALI”) to the Parties, and the ALI is \nexpected to identify certain violations and needs to the Transmission Owner Facilities and related \nfacilities; \nWHEREAS, Large Load Customer has requested that Transmission Owner perform, or cause to \nbe performed, a facilities study in two parts, with Part 1 addressing the local Network Upgrades \nand Transmission Owner Attachment Facilities and proceeding in parallel with the ALI, and \npotentially Part 2 addressing non-local Network Upgrades and coordination and alignment with \nALI results after NYISO provides them, in each case to specify and estimate the cost of the \nequipment, engineering, procurement and construction work needed to complete the Network \nUpgrades and any Transmission Owner Attachment Facilities; and \nWHEREAS, the Parties intend that the results of the Facilities Study will define the Large Load \nProject to a level sufficient to permit the Parties to negotiate one or more subsequent agreements"},{"page":5,"startToken":640,"endToken":1158,"text":"with preliminary scope, cost and schedule before detailed design, material ordering and \nconstruction begin. \nNOW, THEREFORE, in consideration of the mutual covenants contained herein, and other good \nand valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the \nParties, intending to be legally bound, agree as follows: \n1.0 \nDefinitions. When used in this Agreement with initial capitalization, the terms specified \nshall have the meanings indicated herein or, if not defined herein, the meanings specified \nin Section 1 of the NYISO Open Access Transmission Tariff (“OATT”) or Section 44.1 of \nAttachment LL to the OATT, as applicable. “Good Utility Practice” and “Applicable Laws \nand Regulations” have the meanings given in the OATT. If there is a conflict between this \nAgreement and the OATT or Attachment LL, the latter shall control to the extent required \nby Applicable Laws and Regulations. \n2.0 \nPerformance of Facilities Study. Large Load Customer elects, and Transmission Owner \nshall cause, a facilities study (the “Facilities Study”) to be performed in accordance with \nthis Agreement, the applicable criteria, guidelines, standards, specifications, policies, \nprocedures and practices of the North American Electric Reliability Corporation \n(“NERC”), the Northeast Power Coordinating Council (“NPCC”), the New York State \nReliability Council (“NYSRC”), NYISO, Transmission Owner, and Good Utility Practice. \n3.0 \nScope of Work. The scope of the Facilities Study, including the review of local and non-\nlocal Network Upgrades and Transmission Owner Attachment Facilities identified as of \nthe Effective Date, is set forth in Exhibit B (the “Scope of Work”) and shall be subject to \nthe data provided by Large Load Customer in Exhibit A and to information provided by \nNYISO, including ALI results. Each Party accepts the Scope of Work and acknowledges \nthat it is consistent with such Party’s applicable standards, specifications, requirements and \npractices. Any material change in scope shall be addressed under Sections 7.0, 8.0 and \n10.0. \n3.1 \nDynamic Nature of the Facilities Study. Due to the dynamic nature of the Transmission \nSystem and because the Facilities Study will be performed in parallel with the ALI, \nadditional violations and needs may be identified as the ALI and Transmission Owner’s \nanalyses progress. The Facilities Study and any draft Facilities Study report may be \nupdated to incorporate additional Network Upgrades and Transmission Owner Attachment \nFacilities within the categories described in Exhibit B without amendment of this \nAgreement, and the time for completion of the Facilities Study shall be extended by a \nperiod commensurate with any such update. Any such update shall be performed as \nadditional work at Large Load Customer’s expense pursuant to Sections 8.0 and 10.0 of \nthis Agreement. \n3.2 \nAdditional Studies. Additional studies beyond the scope of this Agreement, including \nspecial studies and detailed design studies (such as harmonic analyses or electromagnetic \ntransient studies), may be required to interconnect the Large Load Project, including after \ncompletion of the Facilities Study. Transmission owners who are not a party to this \nAgreement may need to conduct studies beyond the scope of this Agreement based on the \nimpact of the Large Load Project on the Transmission Owner’s Transmission System. Any"},{"page":6,"startToken":1158,"endToken":1704,"text":"such additional studies, and any Network Upgrades identified through them, shall be at \nLarge Load Customer’s expense. \n3.3 \nPlanning Purposes Only. The work performed under this Agreement is for planning and \nestimation purposes only. Nothing in this Agreement obligates Transmission Owner to \nconstruct any Network Upgrades and/or Transmission Owner Attachment Facilities or to \ninterconnect or provide service to the Large Load Project, guarantees any interconnection \nor service, or reserves for Large Load Customer any capacity, queue position, or priority. \nAny interconnection or service shall be governed by separate agreement(s) and applicable \nregulatory requirements. \n3.4 \nRestudy. If Large Load Customer requests a material modification to the Large Load \nProject in accordance with Section 44 of Attachment LL (e.g., an increase in the requested \nload or a change to the proposed operating characteristics) such that restudy is required, \nthe restudy shall be performed as additional work at Large Load Customer’s expense \npursuant to Sections 8.0 and 10.0 of this Agreement and Section 44 of Attachment LL. The \nfinal design of the Large Load Project must comply with all federal, regional, state, and \nlocal regulations as well as all applicable criteria, guidelines, standards, specifications, \npolicies, procedures and practices of Transmission Owner, and Good Utility Practice. \n3.5 \nAccuracy of Information. Except as Large Load Customer may otherwise specify in \nwriting when it provides information to Transmission Owner under this Agreement, Large \nLoad Customer represents and warrants that to the best of its knowledge and belief the \ninformation it has provided or subsequently provides to Transmission Owner is and shall \nbe accurate and complete as of the date the information is provided. Large Load Customer \nshall promptly provide Transmission Owner with any additional information needed to \nupdate information previously provided. \n3.6 \nDisclaimer of Warranty. In performing the Facilities Study or restudy, Transmission \nOwner and any subcontractors and/or consultants engaged by Transmission Owner will \nhave to rely on information provided by Large Load Customer, and possibly by third \nparties, and may not have control over the accuracy of such information. Accordingly, \nneither Transmission Owner nor any subcontractor or consultant engaged by Transmission \nOwner makes any warranties, express or implied, whether arising by operation of law, \ncourse of performance or dealing, custom, usage in the trade or profession, or otherwise, \nincluding without limitation implied warranties of merchantability and fitness for a \nparticular purpose, with regard to the accuracy, content, or conclusions of the Facilities \nStudy or restudy. Large Load Customer acknowledges that it has not relied on any \nrepresentations or warranties by Transmission Owner or its subcontractors or consultants \nnot specifically set forth herein and that no such representations or warranties have formed \nthe basis of its bargain hereunder. \n4.0 \nContents of Facilities Study. The Facilities Study shall specify and estimate the cost of \nthe equipment, engineering, procurement and construction work (including overheads) \nneeded to implement the conclusions of the ALI and any other applicable NYISO study or \nprocess, as of the Effective Date of this Agreement, and to construct the local and non-\nlocal Network Upgrades and Transmission Owner Attachment Facilities. The Facilities \nStudy shall also identify: (1) the scope and estimated cost of the Network Upgrades and \nany Transmission Owner Attachment Facilities; (2) an estimate of the time required to"},{"page":7,"startToken":1704,"endToken":2281,"text":"complete the construction and installation of such facilities; (3) the preliminary one-line \ndiagram reflecting the preliminary understanding of the Point of Change in Ownership and \nthe Point of Interconnection as reflected in Exhibit D, as of the Effective Date of this \nAgreement; and (4) the assumptions and exclusions necessary to develop the cost of the \nNetwork Upgrades and any Transmission Owner Attachment Facilities. For each Network \nUpgrade associated with a violation to which more than one Large Load Project in a \n[Cluster] contributes, the Facilities Study shall identify the allocation of upgrade costs on \nan upgrade-specific basis, using the contribution factors NYISO identified in the ALI for \n[Bulk Electric System] violations and the contribution factors Transmission Owner \ndetermined for non-[Bulk Electric System] violations. \n5.0 \nPoint of Change in Ownership. As applicable, the Parties’ preliminary understanding of \nthe point at which ownership of facilities changes from Transmission Owner to Large Load \nCustomer (the “Point of Change in Ownership”) is set forth in Exhibit D. The Point of \nChange in Ownership is preliminary and non-binding, and shall be confirmed or revised in \nthe Facilities Study and in any subsequent interconnection, cost recovery, security, or \ntransmission service agreements. \n6.0 \nLarge Load Customer’s Responsibilities. Exhibit A contains the tasks, forms, and \ndrawings that must be completed and provided by Large Load Customer to Transmission \nOwner, and the time by which each must be provided, to ensure accurate and timely \ncompletion of the Facilities Study under this Agreement. Failure by Large Load Customer \nto provide accurate, complete, and on-time responses to the requests made by Transmission \nOwner, including but not limited to those made in Exhibit A, may result in delays to the \ncompletion of the Facilities Study and/or an increase in study costs pursuant to Section 8.0, \nand may result in termination of this Agreement under Section 15.0 and withdrawal of the \nLarge Load Project, subject to applicable tariff requirements. \n7.0 \nStudy Deposit. Large Load Customer shall provide to Transmission Owner a deposit in \nthe amount set forth in Exhibit C (the “Study Deposit”) within ten (10) Business Days after \nexecution of this Agreement and, in all events, before Transmission Owner begins study \nwork. Transmission Owner shall not be obligated to begin or continue the Facilities Study \nuntil it has received the Study Deposit and any supplemental deposit required under this \nAgreement. If Large Load Customer does not provide the Study Deposit within ten (10) \nBusiness Days after execution of this Agreement, the Large Load Project shall be subject \nto withdrawal, without a withdrawal cure period. If Exhibit C is revised under Sections 8.0 \nor 10.0, Large Load Customer shall pay any supplemental deposit reasonably requested by \nTransmission Owner within ten (10) Business Days after notice, subject to any applicable \ntariff or deadline of the Federal Energy Regulatory Commission (“FERC”). \n8.0 \nStudy Costs and Invoicing. Study costs shall be based on Transmission Owner’s actual, \ndocumented and reasonably incurred costs, including applicable taxes and overheads, and \nshall be invoiced to Large Load Customer periodically. Large Load Customer \nacknowledges that the estimated rates and amounts in Exhibit C are estimates only, are not \nan exhaustive list of charges, and that Large Load Customer shall pay the actual costs \nincurred by Transmission Owner under this Agreement. Transmission Owner shall provide \nreasonable periodic status updates and shall notify Large Load Customer promptly, and \nbefore incurring material additional costs where practicable, if it anticipates that actual"},{"page":8,"startToken":2281,"endToken":2837,"text":"costs will exceed the Study Deposit by more than thirty percent (30%). The notice shall \ninclude the reasons for the variance, a revised estimate, and any proposed schedule impact. \nThe Parties shall address the resulting supplemental deposit or scope change under Sections \n7.0 and 10.0. \n9.0 \nPayment, Refunds and Disputed Amounts. Transmission Owner shall issue a final \ninvoice after delivery of the final Facilities Study report or, if this Agreement terminates \nearlier, within thirty (30) Calendar Days after termination. Large Load Customer shall pay \nall invoiced amounts in excess of the Study Deposit within thirty (30) Calendar Days after \nreceipt of the invoice. If the Study Deposit exceeds the final invoiced amounts, \nTransmission Owner shall refund the excess within thirty (30) Calendar Days after issuing \nthe final invoice, without interest. If Large Load Customer disputes an invoice, it shall \nprovide written notice describing the basis of the dispute within ten (10) Business Days \nafter receipt, and the dispute shall be resolved in accordance with Section 9.1. A dispute \nshall not delay payment of undisputed amounts. Transmission Owner may suspend study \nwork after notice if Large Load Customer fails to pay undisputed amounts or a required \nsupplemental deposit when due, subject to applicable tariff requirements. \n9.1 \nDispute Resolution. The Parties shall attempt in good faith to resolve any dispute arising \nunder this Agreement through negotiation between senior representatives for a period of \n[thirty (30)] Calendar Days after written notice of the dispute. Disputes not so resolved \nmay be pursued [under the dispute resolution procedures of the NYISO OATT] or before \nFERC, the New York State Public Service Commission, or a court of competent \njurisdiction, as applicable to the subject matter of the dispute. Pending resolution, each \nParty shall continue to perform its obligations under this Agreement, Large Load Customer \nshall pay all undisputed amounts in accordance with Section 9.0, and Large Load Customer \nshall pay any disputed amount to Transmission Owner or into a non-interest-bearing \nescrow account mutually acceptable to the Parties. Upon resolution of the dispute, the \ndisputed amount shall be retained by or released to the Party in whose favor the dispute is \nresolved, without interest. \n10.0 \nModifications; Mandated Changes. Neither Party shall change, modify, adjust or alter \nits responsibilities under this Agreement or the Exhibits without the prior written consent \nof the other Party; provided, however, that such consent shall not be required to the extent \nthe change is necessary to comply with (i) a change in Good Utility Practice made after the \nEffective Date, (ii) a change in Applicable Laws and Regulations promulgated after the \nEffective Date, (iii) any change in Transmission Owner’s procedures, policies, standards, \nor business practices, or (iv) a new or modified final directive, order, standard, requirement, \nrule or other action of a Governmental Authority having jurisdiction issued after the \nEffective Date (each, a “Mandated Change”). The Party required to make a Mandated \nChange shall notify the other Party in writing within fifteen (15) Business Days after it first \nbecomes aware of the need for the Mandated Change, or sooner if required to comply \ntimely with Applicable Laws and Regulations, together with its expected effect on study \ncost, scope, or schedule. The Parties shall cooperate in good faith to implement the \nMandated Change without impairing compliance with the OATT or applicable NYISO \nrequirements."},{"page":9,"startToken":2837,"endToken":3388,"text":"11.0 \nScope of Agreement; Subsequent Agreements. This Agreement is an agreement to \nperform a study only. It is not an agreement to provide or take utility services of any kind, \nincluding, without limitation, interconnection or other electric transmission or delivery \nservice, and it does not provide for the procurement of goods, materials or equipment or \nfor installation or construction services. Any engineering, procurement, construction, or \ninterconnection of the Large Load Project shall be governed by one or more separate \nagreements, which may include a Security Agreement, [an applicable Transmission \nService Agreement], a Network Upgrade Cost Recovery Agreement, an engineering and \nprocurement agreement, and/or an interconnection agreement. \n12.0 \nDraft Report. Upon completion of the Facilities Study, Transmission Owner shall prepare \nand promptly transmit a draft Facilities Study report to Large Load Customer. Within ten \n(10) Calendar Days after providing the draft report, the Parties may meet to discuss the \nresults of the Facilities Study. \n13.0 \nComments and Final Report. Large Load Customer may, within ten (10) Business Days \nafter receipt of the draft report, provide written comments for Transmission Owner’s \nconsideration. Transmission Owner shall consider the comments in good faith but shall not \nbe required to accept or include every comment in the final report. Transmission Owner \nshall issue the final Facilities Study report within fifteen (15) Business Days after receiving \nLarge Load Customer’s comments or promptly after receiving Large Load Customer’s \nstatement that it will not provide comments. If Large Load Customer does not provide \nwritten comments within ten (10) Business Days after receiving the draft report, \nTransmission Owner shall be authorized to issue the final Facilities Study report. \nTransmission Owner may reasonably extend that period on notice to Large Load Customer \nif the comments require additional analyses or other significant modifications, and shall \nprovide a revised issuance date. Any unresolved issue shall be resolved in accordance with \nSection 9.1. \n14.0 \nLimitation of Liability. Except for a Party’s payment obligations, breach of \nconfidentiality or Critical Energy/Electric Infrastructure Information (“CEII”) obligations, \nfraud, gross negligence, willful misconduct, violation of Applicable Laws and Regulations, \nor obligations under an express indemnity, in no event, whether as a result of breach of \ncontract, tort (including negligence and strict liability) or otherwise, shall either Party be \nliable in connection with this Agreement for any special, indirect, incidental, penal, \npunitive or consequential damages of any nature, including delays, lost profits, business \ninterruptions and claims of suppliers and customers, whether or not such damages were \nreasonably foreseeable or such Party was advised that such damages might be incurred. \nNothing in this Section limits FERC’s authority or liability that cannot lawfully be limited. \n15.0 \nTerm and Termination. This Agreement shall become effective on the Effective Date and \nshall remain in effect until the earliest of (i) issuance of the final Facilities Study report and \npayment of all amounts due under this Agreement, (ii) withdrawal or cancellation of the \nLarge Load Integration Request or the Large Load Project, (iii) termination by Large Load \nCustomer on written notice, (iv) termination by Transmission Owner for Large Load \nCustomer’s failure to pay an undisputed amount or required supplemental deposit within \nfive (5) Business Days after written notice, (v) termination by Transmission Owner for \nLarge Load Customer’s failure to provide information required under Section 6.0 or"},{"page":10,"startToken":3388,"endToken":3956,"text":"Exhibit A within ten (10) Business Days after written notice of such failure, (vi) \ntermination by Transmission Owner for Large Load Customer’s failure to timely post the \nsecurity required, based on the Facilities Study, under Attachment LL or any applicable \nSecurity Agreement, or (vii) termination by mutual written consent of the Parties. Upon \ntermination, Large Load Customer shall pay all costs incurred by Transmission Owner \nthrough the date of termination, together with reasonable costs of winding down the study \nwork, and any remaining balance of the Study Deposit shall be refunded in accordance \nwith Section 9.0. Termination or default of this Agreement by Large Load Customer for \nany reason shall not waive Large Load Customer’s rights under the OATT, Attachment \nLL, or Applicable Laws and Regulations. Sections 3.3, 3.6, 8.0, 9.0, 9.1, 14.0, 16.0, 19.0, \nand 21.0 shall survive expiration or termination. \n16.0 \nConfidentiality. Information exchanged under this Agreement that is designated \nconfidential by the disclosing Party, or that reasonably should be understood to be \nconfidential given its nature and the circumstances of disclosure, shall be treated as \nconfidential information, used only for purposes of this Agreement, and disclosed only to \npersonnel, advisors, contractors, subcontractors, vendors, agents, or Governmental \nAuthorities with a need to know and subject to appropriate confidentiality obligations. \nThese obligations shall not apply to information that is publicly available through no \nbreach, already lawfully known, independently developed without use of the information, \nor lawfully received from a third party without a duty of confidentiality, or to disclosure \nrequired by Applicable Laws and Regulations, provided that the receiving Party gives \nadvance notice where legally permitted. CEII shall be protected and disclosed only as \npermitted by 18 C.F.R. § 388.113, the OATT, applicable NYISO procedures, and any \nFERC order. Transmission Owner may require Large Load Customer and its contractors, \nsubcontractors, vendors, or agents to execute a separate non-disclosure agreement as a \ncondition of receiving confidential information or CEII, and nothing in this Agreement \nshall limit, modify, or supersede any such non-disclosure agreement. If this Section \nconflicts with those requirements, the applicable law, regulation, tariff, procedure, or order \nshall control. \n17.0 \nSubcontractors or Agents. Nothing in this Agreement shall prevent a Party from using \ncontractors, subcontractors, vendors, or agents as it deems appropriate to perform its \nobligations hereunder; provided that each Party shall require its contractors, \nsubcontractors, vendors, or agents to comply with the applicable terms of this Agreement, \nincluding the confidentiality obligations of Section 16.0 and any non-disclosure agreement \nrequired by Transmission Owner thereunder, and shall remain primarily liable for their \nperformance. The creation of a subcontract shall not relieve the hiring Party of any \nobligation under this Agreement; provided, however, that in no event shall Transmission \nOwner be liable for the actions or inactions of Large Load Customer or its contractors, \nsubcontractors, vendors, or agents with respect to Large Load Customer’s obligations \nunder this Agreement. These obligations shall not be limited by any limitation of a \ncontractor’s, subcontractor’s, vendor’s, or agent’s insurance. \n18.0 \nNotices. Any notice under this Agreement shall be in writing and shall be hand delivered, \nsent by registered or certified mail, delivered by reputable overnight courier, or sent by \nemail with electronic confirmation of receipt, to the following representatives, or to such \nother representative as a Party may designate by notice. A notice is effective upon delivery"},{"page":11,"startToken":3956,"endToken":4461,"text":"or, for email, upon electronic confirmation of receipt, provided that a notice received after \n5:00 p.m. Eastern Time or on a non-Business Day is deemed received on the next Business \nDay. \nIf to Transmission Owner: [Name], [Title], [Address], [Email] \nIf to Large Load Customer: [Name], [Title], [Address], [Email] \n19.0 \nGoverning Law; Regulatory Authority. The validity, interpretation and enforcement of \nthis Agreement shall be governed by the laws of the State of New York, without regard to \nits conflicts of law principles. This Agreement is subject to all Applicable Laws and \nRegulations, the OATT, Attachment LL, and applicable NYISO requirements. To the \nextent of a conflict, the Federal Power Act, FERC orders and regulations, the OATT, \nAttachment LL, and mandatory NYISO requirements shall control. Each Party reserves the \nright to seek changes in, appeal or otherwise contest any laws, orders or regulations of a \nGovernmental Authority. \n20.0 \nReservation of Rights. Nothing in this Agreement shall alter the right of Transmission \nOwner to make unilateral filings with FERC to modify this Agreement with respect to any \nrates, terms and conditions, charges, classifications of service, rule or regulation under \nSection 205 or any other applicable provision of the Federal Power Act and FERC’s rules \nand regulations, or the existing rights of Large Load Customer to make a unilateral filing \nwith FERC to modify this Agreement under any applicable provision of the Federal Power \nAct; provided that each Party shall have the right to protest any such filing by the other \nParty and to participate fully in any related proceeding. Nothing in this Agreement shall \nlimit the rights of the Parties or of FERC under Sections 205 or 206 of the Federal Power \nAct, except to the extent the Parties otherwise agree herein. \n21.0 \nMiscellaneous.  \n21.1 \nAmendment; Waiver. This Agreement may be amended, superseded or modified \nby a written instrument executed by both Parties, except for a Mandated Change \nunder Section 10.0 or a change required by Applicable Laws and Regulations, the \nOATT, a FERC order, or a mandatory NYISO requirement. No waiver shall be \neffective unless in writing and signed by the Party against whom it is sought to be \nenforced. The failure of a Party to insist on strict performance on any occasion shall \nnot be a waiver, and no waiver of any breach shall be a continuing waiver or a \nwaiver of any other breach. \n21.2 \nNo Third-Party Beneficiaries. This Agreement does not create rights, remedies or \nbenefits in favor of any person other than the Parties and their successors in interest \nand, where permitted, their assigns. \n21.3 \nNo Partnership. This Agreement shall not be construed to create an association, \njoint venture, agency relationship or partnership between the Parties, and neither \nParty shall have authority to bind the other. \n21.4 \nAssignment. Neither Party may assign this Agreement without the prior written \nconsent of the other Party, which consent shall not be unreasonably withheld, \nconditioned or delayed; provided that either Party may assign this Agreement to an"},{"page":12,"startToken":4461,"endToken":4969,"text":"Affiliate on notice, so long as the assignee assumes in writing all obligations under \nthis Agreement, the assignment does not impair compliance with the OATT or \nApplicable Laws and Regulations, and the assigning Party remains responsible \nunless the other Party agrees otherwise in writing. \n21.5 \nSeverability. If any provision of this Agreement is held invalid, illegal or \nunenforceable by a court or Governmental Authority of competent jurisdiction, (a) \nsuch provision shall be deemed separate and independent, (b) the Parties shall \nnegotiate in good faith to restore as nearly as practicable the benefits affected, and \n(c) the remainder of this Agreement shall remain in full force and effect. \n21.6 \nEntire Agreement. This Agreement, including its Exhibits, constitutes the entire \nagreement between the Parties with respect to its subject matter and supersedes all \nprior discussions and understandings with respect thereto. \n21.7 \nAuthority. Each Party represents that the signatory identified beneath its name has \nfull authority to execute this Agreement on its behalf. \n21.8 \nCounterparts; Electronic Signatures. This Agreement may be executed in \ncounterparts, each of which shall be deemed an original and all of which together \nconstitute one instrument. Signatures delivered by facsimile or other electronic \nmeans (including e-mailed PDF) shall be deemed original signatures for all \npurposes. \n21.9 \nForce Majeure. “Force Majeure” means any event or circumstance beyond a \nParty’s reasonable control that prevents the Party from performing an obligation, is \nnot the result of the negligence or intentional wrongdoing of such Party, and could \nnot have been prevented or mitigated by the exercise of Good Utility Practice (in \nthe case of Transmission Owner) or due diligence (in the case of Large Load \nCustomer), including acts of God, fire, flood, storm, lightning, explosion, breakage \nof or accident to machinery, epidemic or pandemic, cyber-attack (except to the \nextent caused by or resulting from Large Load Customer’s failure to comply with \nits obligations under this Agreement), sabotage, terrorism, war, civil disturbance, \nstrikes and labor disturbances, acts or orders of any Governmental Authority, and \ncurtailment or interruption directed by NYISO for reliability reasons. Force \nMajeure shall not include, with respect to Large Load Customer: (a) economic \nhardship, changes in market conditions, or the cost or unavailability of financing; \n(b) delays in Large Load Customer’s procurement of equipment or failure of Large \nLoad Customer’s suppliers or contractors, unless caused by an independent Force \nMajeure event; (c) labor disputes involving only Large Load Customer’s or its \ncontractors’ workforce; (d) Large Load Customer’s failure to obtain required \npermits or approvals, unless it has diligently and timely pursued them; or (e) \nchanges in the demand for, or the business case of, the Large Load Project’s end \nuse. Interruptions resulting from the Single Contingency Design shall not be treated \nas Force Majeure. Force Majeure shall not excuse the failure to make payments \nwhen due or to timely post or maintain the Financial Security. \n21.10 Effect of Force Majeure. A Party shall be excused from performance (other than \nthe obligation to pay money when due) to the extent prevented by Force Majeure,"},{"page":13,"startToken":4969,"endToken":5050,"text":"provided it gives prompt notice with full particulars (confirming any telephone \nnotice in writing), keeps the other Party informed, and exercises due diligence to \nremedy the effects with reasonable dispatch. A Party shall not be required to settle \na labor dispute on terms unsatisfactory to it. \nIN WITNESS WHEREOF, the Parties have caused this Agreement to be executed by their duly \nauthorized representatives as of the Effective Date. \n[TRANSMISSION OWNER] \nBy: ______________________________ \nName: ______________________________ \nTitle: ______________________________ \nDate: ______________________________ \n[LARGE LOAD CUSTOMER] \nBy: ______________________________ \nName: ______________________________ \nTitle: ______________________________ \nDate: ______________________________"},{"page":14,"startToken":5050,"endToken":5080,"text":"EXHIBIT A \nInformation and Required Data to Be Provided by Large Load Customer \n[Transmission Owner to insert its TO-specific study data request form and drawing requirements \n(the “Study Data Package”).]"},{"page":15,"startToken":5080,"endToken":5123,"text":"EXHIBIT B \nDescription of Scope of Work Performed During Facilities Study \n[Transmission Owner to insert its TO-specific Scope of Work for Part 1 and Part 2 of the \nFacilities Study, including the ALI-identified Network Upgrades and Transmission Owner \nAttachment Facilities to be studied.]"},{"page":16,"startToken":5123,"endToken":5369,"text":"EXHIBIT C \nDescription of Schedule and Cost Estimate for the Facilities Study \nStudy schedule. Transmission Owner shall use reasonable efforts to complete the Facilities Study \nwithin twelve (12) months, consisting of six (6) months for the study of Transmission Owner \nAttachment Facilities and local Network Upgrades and six (6) months for the study of non-local \nNetwork Upgrades. The twelve (12)-month study period shall commence on the later of (i) \nTransmission Owner’s receipt of the Study Deposit or (ii) Transmission Owner’s determination \nthat the Study Data Package is complete. If Transmission Owner determines that the Facilities \nStudy cannot be completed within the applicable twelve (12)-month study period, Transmission \nOwner shall notify Large Load Customer and provide an explanation for the delay and a revised \nestimated completion date. \nStudy Deposit. Based on the size of the Large Load Project, as follows: 50 MW to 199 MW – \n$300,000; 200 MW to 499 MW – $350,000; 500 MW and above – $400,000. The Study Deposit \nshall be paid at the time and in the manner provided in Section 7.0, and shall be subject to \nsupplemental deposit, final invoicing, and refund under Sections 7.0, 8.0, and 9.0. \nEstimated rates. [Transmission Owner to insert.] All rates are estimates and subject to adjustment. \nLarge Load Customer shall pay all actual, documented and reasonably incurred costs, including \napplicable taxes and overheads, incurred by Transmission Owner under this Agreement, as \nprovided in Sections 8.0 and 9.0."},{"page":17,"startToken":5369,"endToken":5474,"text":"EXHIBIT D \nPreliminary Point of Change in Ownership \nPreliminary Point of Change in Ownership. The Point of Change in Ownership is preliminarily \nexpected to be located at [_______] [within the footprint of the proposed Large Load Project \nsubstation]. Transmission Owner, as applicable to the CTO or ATO facilities, is expected to own \n[the ___ kV transmission line from the Point of Interconnection at the [_____] Substation to the \nproposed Large Load Project substation]. Large Load Customer will own all facilities on its side \nof the Point of Change in Ownership. The ownership allocation is preliminary and shall be \nconfirmed in the Facilities Study and the applicable subsequent agreements."}],"sections":[{"p":1,"at":0,"title":"Attachment G","method":"printed heading","endPage":3,"endAt":0,"startToken":0,"endToken":46},{"p":3,"at":0,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":17,"endAt":699,"startToken":46,"endToken":5474}]}