{"document":{"slug":"rec-20261116-5335-6","title":"Att I Panel Testimony","issued":"2026-11-16","accession":"20261116-5335","docket":"ER27-529-000","group":"NYISO and New York transmission owners’ large-load tariff revisions","filer":"New York Independent System Operator, Inc.Central Hudson Gas & Electric CorporationNew York State Electric & Gas Corporation ,Rochester Gas and Electric Corporation ,Niagara Mohawk Power Corporation ,Consolidated Edison Company of New York, Inc. ,Orange and Rockland Utilities, Inc. ,","kind":"attachment","file":"sources/filings/text/20261116-5335_010.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5335","tier":"record","parent":"rec-20261116-5335","sha256":"78f1a9a30f61de304a5f2a7e9d812cf614ff9d4f58f0fcbb15b9aa3eca1db630","pages":451,"tokens":98530,"emptyPages":[34,112,113,114,115,117,118,119,120,121,122,123,124,125,126,127,128,129,130,131,132,350,351,352,353,354,355,356,358,359,360,361,362,363,364,365,366],"textThemes":["flex","cost","study","retail"]},"pages":[{"page":1,"startToken":0,"endToken":16,"text":"Attachment I \nPanel Testimony and exhibit of Brian McNierney, \nCarol Teixeira, Yan Flishenbaum, and Stacy Powers"},{"page":2,"startToken":16,"endToken":77,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n) \n \nCentral Hudson Gas & Electric Corporation  \n) \nConsolidated Edison Company of New York, Inc. \n) \nNew York State Electric & Gas Corporation  \n)     Docket No.   ER27-___-000 \n \nNiagara Mohawk Power Corp.  \n \n) \nOrange and Rockland Utilities, Inc. \n \n) \nRochester Gas and Electric Corporation \n \n) \n \n \n) \n \n \n \nPREPARED TESTIMONY OF \nBRIAN MCNIERNEY, CAROL TEIXEIRA, YAN FLISHENBAUM, AND STACY \nPOWERS \nNovember 16, 2026"},{"page":3,"startToken":77,"endToken":133,"text":"TABLE OF CONTENTS \nI. \nINTRODUCTION............................................................................................................. 2 \nII. \nHISTORICAL BACKGROUND ..................................................................................... 8 \nIII. \nNYPSC BUNDLED DELIVERY RATES ..................................................................... 10 \nIV. \nTHE NYPSC RATEMAKING PROCESS .................................................................... 11 \nV. \nCURRENT RATES AND CHARGES........................................................................... 13 \nVI. \nVOLTAGE DIFFERENTIATION OF PSC-APPROVED DELIVERY RATES ...... 15 \nVII. \nTHE INDICATED NYTOS’ REVISIONS TO ISO OATT SECTION 5 ................... 25 \nVIII. THE NYISO’S COMPANION FILING ....................................................................... 27 \nIX. \nCONCLUSION ............................................................................................................... 29"},{"page":4,"startToken":133,"endToken":151,"text":"LIST OF EXHIBITS \n \n Exhibit A – The NYTOs’ PSC Delivery Rates of the Applicable Transmission Owner \nto Large Loads"},{"page":5,"startToken":151,"endToken":215,"text":"Attachment I \nPage 1 of 29 \n \n \n \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n) \n \nCentral Hudson Gas & Electric Corporation  \n) \nConsolidated Edison Company of New York, Inc. \n) \nNew York State Electric & Gas Corporation  \n)     Docket No.   ER27-___-000 \n \nNiagara Mohawk Power Corp.  \n \n) \nOrange and Rockland Utilities, Inc. \n \n) \nRochester Gas and Electric Corporation \n \n) \n \n \n) \n \n \nPREPARED TESTIMONY OF  \nBRIAN MCNIERNEY, CAROL TEIXEIRA, YAN FLISHENBAUM, AND STACY \nPOWERS"},{"page":6,"startToken":215,"endToken":443,"text":"Attachment I \nPage 2 of 29 \n \n \nI. \nINTRODUCTION \nQ. \nMR. MCNIERNEY, PLEASE STATE YOUR NAME AND BUSINESS ADDRESS.   \nA. \nMy name is Brian McNierney.  My business address is 18 Link Drive, Binghamton, New \nYork 13902.  \nQ. \nMR. MCNIERNEY, BY WHOM ARE YOU EMPLOYED AND IN WHAT \nCAPACITY? \nA.  \nI am employed by Rochester Gas & Electric Corporation (“RG&E”) as Director – \nRegulatory for both RG&E and New York State Electric & Gas Corporation (“NYSEG”).   \nQ. \nMR. MCNIERNEY, WHAT ARE YOUR AREAS OF RESPONSIBILITY IN THIS \nPOSITION? \nA. \nI am responsible for electric rate calculations, and rate design for NYSEG and RG&E as \nwell as representing NYSEG and RG&E in various rate and regulatory proceedings. \nQ. \nMR. MCNIERNEY, PLEASE BRIEFLY DESCRIBE YOUR EDUCATIONAL \nBACKGROUND AND EMPLOYMENT EXPERIENCE.  \nA. \nIn 1986, I graduated from St. Bonaventure University with a Bachelor of Business \nAdministration.  I began my employment at NYSEG and RG&E in 2000 as a Lead Analyst \nin Electric Supplier Services.  Over the years since then, I have held several positions \nwithin the Companies and have been in the Regulatory Department since 2013. \nQ. \nMR. MCNIERNEY, HAVE YOU PREVIOUSLY TESTIFIED IN REGULATORY \nPROCEEDINGS?  \nA. \nYes, I have submitted testimony in New York Public Service Commission (“NYPSC” or \n“PSC”) Cases 15-E-5 0283 et al., Cases 19-E-0378 6 et al., Cases 22-E-0317 7 et al. and \nCases 25-E-0375 et al."},{"page":7,"startToken":443,"endToken":706,"text":"Attachment I \nPage 3 of 29 \n \n \nQ.  \nMS. TEIXEIRA, PLEASE STATE YOUR NAME AND BUSINESS ADDRESS.  \nA.  \nMy name is Carol Teixeira.  My business address is 300 Erie Boulevard West, Syracuse, \nNew York 13202. \nQ.  \nMS. TEIXEIRA, BY WHOM ARE YOU EMPLOYED AND IN WHAT CAPACITY?  \nA.  \nI am employed by the National Grid USA Service Company, Inc. (“National Grid Service \nCompany”), a subsidiary of National Grid USA (“National Grid”), as Manager of New \nYork Electric Pricing.  I am responsible for supervising the study, analysis, and design of \ndelivery service rates, rate contracts, surcharge adjustment factors, riders, and terms and \ncondition of service for National Grid’s utility, Niagara Mohawk Power Corporation d/b/a \nNational Grid (“NMPC” or “Niagara Mohawk”), including developing tariffs and \ntestimony supporting such rates before the NYPSC. \nQ.  \nMS. TEIXEIRA, PLEASE DESCRIBE YOUR EDUCATIONAL BACKGROUND.  \nA.  \nIn 1989, I graduated from Syracuse University with a Bachelor of Science in Electrical \nEngineering.  In 2007, I received my Master of Business Administration from LeMoyne \nCollege. \nQ.  \nMS. TEIXEIRA, PLEASE DESCRIBE YOUR PROFESSIONAL BACKGROUND.  \nA.  \nI first joined Niagara Mohawk in 1989 when I was hired as an Assistant/Junior Engineer, \nInstrumentation Control and Design, where I was responsible for the design and installation \nof control and instrumentation systems at Niagara Mohawk’s fossil generating stations.  \nFrom 1997 to 2002, I served as a Power Contract Specialist at Niagara Mohawk in various \ndepartments, including Unregulated Generation, Transmission Scheduling, and Customer \nContract Services, where I was responsible for different aspects of power purchase \nagreements and other supply contracts with generators and customers interconnected to"},{"page":8,"startToken":706,"endToken":973,"text":"Attachment I \nPage 4 of 29 \n \n \nNiagara Mohawk’s system.  From 2002 to 2005, I was a Senior/Principal Analyst, Electric \nPricing at Niagara Mohawk, with responsibility for developing and administrating Niagara \nMohawk’s flexible retail electric contracts for large commercial and industrial customers.  \nI became Transmission Account Manager, Transmission Commercial Services in 2005, \nwhere I had responsibility for managing the Company’s interconnection process in \ncompliance with Federal Energy Regulatory Commission (“FERC” or “Commission”) \npolicies and orders and acting as primary contact for wholesale generators interconnecting \nto National Grid’s transmission system in both New York and New England.  In 2008, I \nwas promoted to Manager, Load Research and Analysis.  My responsibilities in this \nposition included preparation of load research studies to support electric rate cases, \ncustomer retail billing, settlement, and special studies for all National Grid companies and \nthe Long Island Power Authority (“LIPA”), as well as overseeing survey meter design \nsample studies for all companies and ensuring a sufficient sample of survey meters in the \nfield to support load studies.  I became the Manager of Billing Project Management \nServices in 2011, with responsibility for support and operations of customer billing for all \nNational Grid companies and LIPA.  I took my current position as Manager, New York \nElectric Pricing in May 2014.   \nQ.  \nMS. \nTEIXEIRA, \nHAVE YOU \nPREVIOUSLY \nTESTIFIED \nBEFORE A \nREGULATORY COMMISSION? \nA.  \nYes.  I testified before the NYPSC in support of the electric rate proposals in the NMPC’s \n2017 electric rate case (Case 17-E-0238), the NMPC 2020 rate case (Case 20-E-0380) and \nthe NMPC 2024 rate case (Case 24-E-0322).  In addition, I have testified on behalf of"},{"page":9,"startToken":973,"endToken":1221,"text":"Attachment I \nPage 5 of 29 \n \n \nNational Grid in support of the NMPC Wholesale Distribution Services tariff, filed with \nFERC on October 2, 2026, in Docket No. ER27-31, which is pending approval. \nQ.  \nMR. FLISHENBAUM, PLEASE STATE YOUR NAME AND BUSINESS ADDRESS.  \nA.  \nMy name is Yan Flishenbaum.  My business address is 4 Irving Place, New York, NY \n10003. \nQ.  \nMR. FLISHENBAUM, BY WHOM ARE YOU EMPLOYED AND IN WHAT \nCAPACITY? \nA.  \nI am employed by Consolidated Edison Company of New York, Inc. (“Con Edison”).   \nQ.  \nMR. FLISHENBAUM, WHAT ARE YOUR AREAS OF RESPONSIBILITY IN THIS \nPOSITION?  \nA.  \nI currently serve as Director of Con Edison’s Rate Engineering Department. \nQ.  \nMR. FLISHENBAUM, PLEASE BRIEFLY DESCRIBE YOUR EDUCATIONAL \nBACKGROUND AND EMPLOYMENT EXPERIENCE.  \nA.  \nI received a Bachelor of Business Administration in Economics from Pace University in \n2001 and a Master of Business Administration in Finance and Economics from New York \nUniversity in 2008.  I began my career in 2001 in the Cost Analysis area of the Rate \nEngineering Department.  In 2003, I was promoted to Analyst, where I focused on \ndeveloping costing methodologies related to unbundling.  I advanced to Senior Analyst in \n2005, and in 2008, became a Senior Rate Analyst and was responsible for developing the \nCompany’s cost-of-service models.  In 2013, I was promoted to Section Manager of the \nElectric Rates area of the Rate Engineering Department.  I later served as a Department \nManager for the Load Research and Cost of Service group, as well as a Department"},{"page":10,"startToken":1221,"endToken":1419,"text":"Attachment I \nPage 6 of 29 \n \n \nManager of the Orange and Rockland Rates section.  I assumed my current role as Director \nof the Rate Engineering Department in 2025. \nQ.  \nMR. FLISHENBAUM, HAVE YOU PREVIOUSLY TESTIFIED IN REGULATORY \nPROCEEDINGS?  \nA.  \nYes.  I have filed testimony before the NYPSC and the New Jersey Board of Public \nUtilities. \nQ.  \nMS. POWERS, PLEASE STATE YOUR NAME AND BUSINESS ADDRESS.  \nA.  \nMy name is Stacy Powers.  My business address is 284 South Avenue, Poughkeepsie, New \nYork 12601. \nQ.  \nMS. POWERS, BY WHOM ARE YOU EMPLOYED AND IN WHAT CAPACITY?  \nA.  \nI am employed by Central Hudson Gas & Electric Corporation (“Central Hudson”) as \nDirector – Regulatory Forecasts & Planning.    \nQ.  \nMS. POWERS, WHAT ARE YOUR AREAS OF RESPONSIBILITY IN THIS \nPOSITION?  \nA.  \nI am responsible for cost studies, rates, tariffs, revenue requirements and regulatory \ncompliance.  \nQ.  \nMS. POWERS, PLEASE BRIEFLY DESCRIBE YOUR EDUCATIONAL \nBACKGROUND AND EMPLOYMENT EXPERIENCE.  \nA.  \nI received a Bachelor of Science degree in Business Administration and Accounting from \nMarist College in 2006 and a Master of Business Administration from Marist College in \n2010.  I have served in various capacities of increasing responsibility in the rates and \nregulatory area of Central Hudson since 2006."},{"page":11,"startToken":1419,"endToken":1697,"text":"Attachment I \nPage 7 of 29 \n \n \nQ.  \nMS. POWERS, HAVE YOU PREVIOUSLY TESTIFIED IN REGULATORY \nPROCEEDINGS?  \nA.  \nYes, I have filed testimony before the NYPSC.  \nQ. \nON WHOSE BEHALF ARE YOU ALL TESTIFYING?  \nA. \nWe are testifying on behalf of Central Hudson, Con Edison, NYSEG, NMPC, Orange and \nRockland Utilities, Inc. (“O&R”), and RG&E (collectively, “Indicated New York \nTransmission Owners” or “Indicated NYTOs” and individually, “Transmission Owner”) as \nrates subject matter expert representatives.   \nQ. \nWHAT IS THE PURPOSE OF THIS TESTIMONY?  \nA. \nThe purpose of our testimony is to support the Indicated NYTOs’ proposed revisions to \nSection 5 of the New York Independent System Operator, Inc. (“NYISO”) Open Access \nTransmission Tariff (“ISO OATT”), which the Indicated NYTOs are submitting pursuant \nto section 205 of the Federal Power Act (“FPA”) in response to the Commission’s June 18, \n2026 order in Docket No. EL26-69-000.1  Revised Section 5 continues the practice that has \nbeen in effect since the NYISO commenced operation in 1999.  Under revised Section 5, \nLarge Loads or Eligible Customers serving Large Loads, including Eligible Customers \ntaking the new Firm and Non-Firm Withdrawal Service that the NYISO is proposing in its \ncompanion section 205 filing, will pay the existing retail delivery rates approved by the \nNYPSC or, in the case of LIPA, by the LIPA Board of Trustees.  The Indicated NYTOs are \nnot proposing new rates.  Instead, revised Section 5 references the applicable delivery \nservice classifications for each Transmission Owner, as approved by the NYPSC or the \nLIPA Board of Trustees, as applicable.  Our testimony explains the history of Section 5, \n \n1  \nN.Y. Indep. Sys. Operator, Inc., 195 FERC ¶ 61,216 (2026) (“Show Cause Order”)."},{"page":12,"startToken":1697,"endToken":1978,"text":"Attachment I \nPage 8 of 29 \n \n \nhow bundled New York delivery rates are developed and collected, how those rates are \nvoltage-differentiated and offer Large Loads meaningful choices, and why a separate \ntransmission-only rate for Large Loads at this time would be potentially harmful.  \nQ. \nARE YOU ALL SPONSORING ANY EXHIBITS IN CONNECTION WITH THIS \nTESTIMONY?  \nA. \nYes.  On behalf of the Indicated NYTOs,2 we are sponsoring the following exhibits, which \nare attached to and made a part of our testimony:  Exhibit A – The NYTOs’ PSC Delivery \nRates of the Applicable Transmission Owner to Large Loads.  \nII. \nHISTORICAL BACKGROUND \nQ. \nWHEN DID RETAIL ACCESS BEGIN IN NEW YORK RELATIVE TO THE \nSTART OF THE NYISO’S OPERATIONS? \nA. \nThe PSC adopted retail access programs in 1996.  Under retail access, electric commodity \nsupply was unbundled from transmission and distribution service for eligible retail \ncustomers and the energy service companies (“ESCOs”) serving them.  Retail access \nprograms permit eligible retail customers to choose a competitive supplier or ESCO for the \ncommodity while the local utility continues to provide the delivery function over its \ntransmission and distribution system.  Delivery rates applicable to this form of “retail \nwheeling” or “retail transmission service” are deliveries of third-party supplied energy to \nretail customers in New York.3   \n \n2  \nAs a non-jurisdictional utility, LIPA is not a respondent to the Show Cause Order and its rates and charges \nfor transmission service are reviewed and approved by LIPA’s Board of Trustees under applicable state law.  Where \naddressed in this testimony, the discussion of LIPA’s delivery service classifications and related rates and charges is \nsolely for informational purposes. \n3  \nCase 94-E-0952, et al., Opinion No. 96-12 (issued and eff. May 20, 1996)."},{"page":13,"startToken":1978,"endToken":2208,"text":"Attachment I \nPage 9 of 29 \n \n \nAs part of the development of the initial ISO OATT, Section 5 of the ISO OATT was \ndeveloped to address already State-approved retail access programs, and it identified the \nrates and charges under which retail access customers would receive service.  FERC \naccepted Section 5 as part of the tariff filing effective at the start of the NYISO’s operations \nin 1999.4   \nQ. \nHOW HAS SECTION 5 FUNCTIONED SINCE THE NYISO BEGAN \nOPERATIONS? \nA. \nSince the NYISO was formed, Section 5 of the ISO OATT has referenced each \nTransmission Owner’s PSC-approved retail access tariff or, for LIPA, the rates and terms \nestablished under State law, as the respective retail tariffs may be amended from time-to-\ntime.  Section 5 provides that the rates, terms, and conditions for retail access service are \nthose set in the applicable retail tariff, and that the Transmission Owner bills and collects \nthose charges in accordance with that tariff.  The Commission accepted these provisions in \n1999.5  In this way, the PSC has set the retail delivery rates for each of the Indicated \nNYTOs, and the ISO OATT has incorporated such rates by reference.  This cooperative \nfederalism arrangement has worked for the entire life of the NYISO, approximately 27 \nyears. \n \n \n4  \nCent. Hudson Gas & Elec. Corp., 86 FERC ¶ 61,062, order on reh’g and compliance, 88 FERC ¶ 61,138 \n(1999). \n5  \nId."},{"page":14,"startToken":2208,"endToken":2476,"text":"Attachment I \nPage 10 of 29 \n \n \nIII. \nNYPSC BUNDLED DELIVERY RATES \nQ. \nHOW DO THE INDICATED NYTOS RECOVER THEIR TRANSMISSION AND \nDISTRIBUTION COSTS FROM RETAIL CUSTOMERS? \nA. \nCentral Hudson, Con Edison, NYSEG, NMPC, O&R, and RG&E recover their \ntransmission and distribution costs through bundled delivery rates set by the PSC.  Through \nmany proceedings, the PSC has unbundled the power supply function from delivery \nservice.  Capacity and energy supply are therefore not priced and billed under the \nTransmission Owner’s retail tariff delivery rates, and the retail customers either take \nunbundled supply from the Transmission Owner pursuant to its Provider of Last Resort \n(“POLR”) obligation or enter into separate purchases from a competitive load-serving \nentity (“LSE”), which several PSC-approved tariffs call an ESCO.  Retail customers may \nalso function as their own ESCO.  While the commodity supply (capacity and energy) is \nunbundled from the delivery rates, the delivery rates remain bundled for the most part, even \nthough they are voltage-differentiated based on cost allocations which intentionally remove \ncertain distribution costs from the rates developed for transmission-level customers.  There \nis, however, no separate retail rate consisting only of transmission-related costs.  The \nDelivery rates are recovered, together with distribution, metering, customer service, and \noverhead costs, through the customer and demand charges of each service classification. \nQ. \nWHY DOES THE BUNDLED NATURE OF THE NYPSC’S DELIVERY RATES \nMATTER HERE? \nA. \nThere is no stand-alone, transmission-only retail rate in New York that could be applied to \nLarge Loads.  The transmission component of retail delivery service is embedded in rates \nthat the PSC approved to recover each utility’s total delivery revenue requirement from all"},{"page":15,"startToken":2476,"endToken":2744,"text":"Attachment I \nPage 11 of 29 \n \n \nretail customer classes.  A Large Load connecting at transmission voltage will take service \nunder one of these classifications.  A Large Load customer’s charges will therefore reflect \ntransmission costs together with its fair share of other delivery costs, as the PSC has \ndetermined.   \nIV. \nTHE NYPSC RATEMAKING PROCESS \nQ. \nPLEASE DESCRIBE THE NYPSC RATE CASE PROCESS. \nA. \nA rate case typically begins when the utility files proposed tariff changes with the NYPSC, \ntogether with testimony and exhibits supporting its revenue requirement.  The revenue \nrequirement covers all the costs of running the delivery business, including operation and \nmaintenance expense, administrative and general expense, depreciation, taxes, and a return \non rate base, and it is recovered through base delivery rates.  Certain items, such as the \nSystem Benefits Charge (“SBC”), are separated out and billed through surcharges rather \nthan base rates. \n \nThe utility also files an embedded cost of service (“ECOS”) study and rate design \ntestimony.  The ECOS study is used as a guide as part of the rate design process to allocate \nthe revenue requirement among service classes.  The rate design testimony proposes how \neach service class’s share will be recovered through customer charges, demand charges, \nenergy charges, and time-of-use or other rate features.  \nQ. \nWHO PARTICIPATES IN AN NYPSC RATE CASE? \nA. \nThe Staff of the Department of Public Service (“DPS Staff”) participates as a party in every \nmajor rate case.  Other parties may also intervene, typically including the Utility \nIntervention Unit of the New York State Department of State, city agencies, municipalities, \nelected officials, large industrial and commercial customer associations, advocates for low-"},{"page":16,"startToken":2744,"endToken":3026,"text":"Attachment I \nPage 12 of 29 \n \n \nincome customers, ESCOs and their trade associations, environmental advocates, and \nothers.  These parties represent a wide range of customer classes and interests, including \nthe interests of high-voltage, high load-factor customers. \nQ.  \nHOW DO PARTIES TYPICALLY PARTICIPATE IN A NYPSC RATE CASE? \nA. \nThe parties conduct extensive discovery through information requests, and DPS Staff (and \nat times other intervenors) file responsive testimony.  The utility may file rebuttal \ntestimony.  Contested issues may be tried in evidentiary hearings before PSC \nAdministrative Law Judges (“ALJs”), at which parties may introduce direct testimony and \nexhibits and witnesses may be cross-examined.  The ALJs may issue a recommended \ndecision, and parties may file briefs and exceptions before the PSC acts. \nQ. \nDO MOST RATE CASES PROCEED TO A FULLY LITIGATED DECISION? \nA. \nNo.  Most rate cases are resolved through multi-party settlement negotiations that produce \na joint proposal.  Settlement negotiations are conducted under the PSC’s settlement \nprocedures, and all parties have an opportunity to participate.  A joint proposal typically \nresolves the revenue requirement, cost allocation, and rate design for every service class at \nonce.  It reflects negotiated exchanges of consideration, in which parties accept outcomes \non some issues in return for outcomes on others.   \nQ. \nHOW DOES THE PSC REVIEW A JOINT PROPOSAL? \nA. \nThe PSC does not simply accept a joint proposal because the parties have agreed to it.  It \nreviews the joint proposal under its settlement guidelines, which consider, among other \nthings, whether the settlement is consistent with law and PSC policy; whether it produces \nresults within the range of reasonable outcomes that would likely arise from litigation; \nwhether it balances the interests of ratepayers, investors, and the long-term viability of the"},{"page":17,"startToken":3026,"endToken":3265,"text":"Attachment I \nPage 13 of 29 \n \n \nutility; and whether it is supported by testimony and evidence submitted in the formal \nrecord.6  The PSC may review items such as testimony, evidence, statements in support \nfrom the parties, and, if applicable a recommended decision, submitted in the formal record \nto support its rate order.   \nQ. \nHOW DOES THE PSC RATEMAKING PROCESS CONCLUDE? \nA. \nThe PSC issues a final order adopting, modifying, or rejecting the joint proposal, or \nresolving litigated issues, and directs the utility to file compliance tariffs.  \nQ. \nDID THE CURRENT RATES OF THE INDICATED NYTOS RESULT FROM \nSETTLEMENTS? \nA. \nYes.  The current rates of Central Hudson, Con Edison, NMPC, and O&R are based on \nPSC-approved settlements rather than fully litigated orders.  These rate plans generally run \nfor three years.  The rate plans may be extended pending new rate filings, or continued \nunder temporary rates set by the PSC.  NYSEG and RG&E are currently operating under \na temporary rate order issued in May 2026 as they continue settlement negotiations in their \nongoing rate case.  \nV. \nCURRENT RATES AND CHARGES  \nQ. \nHAVE THE RATE DESIGNS FOR TRANSMISSION-VOLTAGE CUSTOMERS \nBEEN DEVELOPED OVER TIME? \nA. \nYes.  The service classifications available to transmission-voltage customers, including \nstandby and optional demand rates, have been refined or resulted from an evolutionary \nprocess over many individual utility rate cases and statewide proceedings and many years.  \n \n6  \nProcedural Guidelines for Settlements, Cases 90-M-0255 et al. (1992)."},{"page":18,"startToken":3265,"endToken":3506,"text":"Attachment I \nPage 14 of 29 \n \n \nEach iteration was refined through discovery, testimony, and negotiation among parties \nrepresenting all customer classes, and each was approved by the PSC. \nQ. \nWHAT CHARGES DO TRANSMISSION-VOLTAGE DELIVERY CUSTOMERS \nPAY PURSUANT TO PSC-APPROVED TARIFFS? \nA. \nBase delivery rates for these classes generally consist of a monthly customer charge plus a \nper-kW demand charge.  In addition, delivery customers pay a series of PSC-authorized \npass-through surcharges, including the SBC and taxes.  Depending on who serves as the \ncustomer’s LSE, the customer or its LSE also pays supply-related charges.  \nQ. \nMR. MCNIERNEY, DOES A TRANSMISSION-VOLTAGE SERVICE CLASS PAY \nONLY FOR TRANSMISSION COSTS? \nA. \nNo.  Customers in a transmission-voltage service class pay more than transmission charges \nalone.  For example, under NYSEG’s latest ECOS study for retail delivery service, \napproximately two-thirds of the transmission service class’s allocated costs are \ntransmission-related.  The remaining one-third is an allocable share of other delivery, \nmetering, call center, and similar overhead costs that the utility incurs to serve all \ncustomers. \nQ. \nPLEASE DESCRIBE THE PSC-AUTHORIZED DELIVERY SURCHARGES. \nA. \nEach Indicated Transmission Owner has several PSC-authorized surcharges that apply to \nits delivery load regardless of who serves as the customer’s LSE.  All Indicated NYTOs \nhave identical or similar surcharges, with some variation, and some surcharges are unique \nto particular companies.  Electric surcharges are adjustments added to or subtracted from \na customer’s bill to account for certain costs that are not included in the base electric rates."},{"page":19,"startToken":3506,"endToken":3763,"text":"Attachment I \nPage 15 of 29 \n \n \nQ. \nHOW ARE THE SBC AND THE COSTS OF ZERO-EMISSION CREDITS \nCOLLECTED? \nA. \nThe components of the SBC related to cost recovery for the program budgets of the New \nYork State Energy Research and Development Authority (“NYSERDA”) are split among \nthe utilities on a load ratio share basis and billed to delivery customers as a per-kWh charge.  \nOn the other hand, zero-emission credit (“ZEC”) costs are handled differently.  NYSERDA \ninforms each LSE of its ZEC-related obligation.  Each utility then sets an annual per-kWh \nrate that it bills to each utility’s respective commodity customers.  Presumably, other non-\nutility LSEs then  charge their allocated ZEC costs to their retail customers.  \nQ. \nWHAT IS THE ROLE OF THE WHOLESALE TRANSMISSION SERVICE \nCHARGE UNDER ATTACHMENT H OF THE NYISO OATT? \nA. \nPursuant to Section 14.1 of Attachment H, the wholesale Transmission Service Charge \n(“TSC”) is of limited application and applies primarily to “wheel through” and “export” \ntransactions that exit the New York Control Area.  The wholesale TSC does not apply to \nretail delivery and Transmission Services within the NYISO, including the NYISO’s new \nproposed Firm and Non-Firm Withdrawal Services applicable to retail customers, which \nare PSC-established rates in Section 5 of the ISO OATT. \nVI. \nVOLTAGE DIFFERENTIATION OF PSC-APPROVED DELIVERY RATES \nQ. \nPLEASE \nSUMMARIZE \nTHE \nDELIVERY \nRATES \nAPPLICABLE \nTO \nTRANSMISSION-VOLTAGE INTERCONNECTED LARGE LOAD CUSTOMERS \nFOR EACH NYTO. \nA. \nThe following table lists, by utility, the various service classifications that will apply to \nLarge Loads, subject to meeting the requirements to receive the specified service."},{"page":20,"startToken":3763,"endToken":3940,"text":"Attachment I \nPage 16 of 29 \n \n \nTable 1: Summary of Applicable Service Classifications by Transmission Owner \nTRANSMISSION OWNER \nDELIVERY SERVICE CLASSIFICATIONS \nCentral Hudson \nSC 13: Transmission Service \n \nSC 14: Standby Service \nConsolidated Edison \nSC 9: Rate II - General - Large - Time-of-Day \n \nSC 9: Rate V - General - Large - Standby Service \n(Large) \nLIPA \nSC-2: MRP (Large General and Industrial Service \nWith Multiple Rate Periods) \nSC-12: Standby Service and Optional Rate \nService \nNiagara Mohawk \nSC 3A: Standard Large General Service (or SC4 \nat the SC3A parent service class rates, if \napplicable) \n \nSC 7: Standby Service and Optional Rate Service \nNew York State Electric & Gas \nCorporation \nSC 7: Large General Service with Time-of-Use \nMetering \n \nSC 11: Standby Service \nOtherwise Applicable Service Class 7 \n \nSC 15: Optional Demand Service \nOtherwise Applicable Service Class 7 \nOrange & Rockland Utilities, Inc.  \nSC 9 / SC 22: Standard Transmission Service \n \nSC 9 / 22: Standby Transmission Service \nRochester Gas and Electric \nCorporation \nSC 8: Large General Service with Time-of-Use \nMetering \n \nSC 14: Standby Service  \nOtherwise Applicable Service Class 8 \n \nSC 15: Optional Demand Service \nOtherwise Applicable Service Class 8"},{"page":21,"startToken":3940,"endToken":4192,"text":"Attachment I \nPage 17 of 29 \n \n \nQ. \nHAVE EACH OF THE INDICATED TOS PROVIDED THE SERVICE  \nCLASSIFICATIONS IN EXHIBIT A? \nA. \nYes.   \nQ. \nMR. MCNIERNEY, ARE THE PSC-APPROVED DELIVERY RATES THAT WILL \nAPPLY TO LARGE LOADS DIFFERENTIATED BY VOLTAGE? \nA. \nYes.  For example, for NYSEG’s PSC service classification SC 7, Large General Service \nwith Time-of-Use Metering, there are three currently available voltages (SC 7-1, 7-2, and \n7-4):  7-1 – Secondary, 120–480 volts; 7-2 – Primary, 2.4–34.5 kV or regulated 46 kV; and \n7-4 – Transmission, 115 kV and above.  \nQ.  \nMR. MCNIERNEY, WHAT ARE THE RATES FOR HIGHER VOLTAGE \nCUSTOMERS? \nA. \nYes.  For example, for NYSEG’s PSC service classification SC 7, Large General Service \nwith Time-of-Use Metering, the applicable demand charge (per kW) for each one of those \nvoltages classifications is currently: 7-1 – $14.55; 7-2 – $13.76; and 7-4 – $2.07. \n Q. \nMR. MCNIERNEY, CAN YOU PROVIDE A HYPOTHETICAL EXAMPLE OF \nWHAT THE RESULTING CHARGE WOULD BE FOR A LARGE LOAD UNDER \nNYSEG’S PSC SERVICE CLASSIFICATION SC 7, ASSUMING A 100 MW LOAD \nAND 73,000 MWH PER MONTH UNDER THE LOWEST AND HIGHEST \nVOLTAGE RATES? \nA. \nYes.  A 100 MW Large Load with 73,000 MWh of energy consumption for a given month \nwould have demand charges under NYSEG’s PSC service classification SC 7: 7-1 of \n$1,455,000 compared to $207,000 under NYSEG’s transmission voltage level demand \ncharge 7-4 rate.  I do not mean to imply that it is plausible to assume a 100 MW load would"},{"page":22,"startToken":4192,"endToken":4460,"text":"Attachment I \nPage 18 of 29 \n \n \nconnect at distribution voltage.  But the application of the distribution demand charge \nversus the highest voltage level rate illustrates how substantially lower the rate and charges \nwould be under the transmission level rate compared to the distribution rate.   \nQ. \nMS. TEIXEIRA, DOES NIAGARA MOHAWK HAVE SIMILAR VOLTAGE \nDIFFERENTIATION? \nA.  \nYes.  NMPC electric rates have voltage differentiated delivery rates for all of its large \ncommercial and industrial service classes.  The voltage delivery levels for which distinct \ndelivery rates apply are for customers connected to the NMPC distribution system at \nSecondary (0 – 2.2 kV), Primary (2.2 kV – 15 kV), Sub-transmission (22 kV – 50 kV) and \nTransmission (Over 60 kV).  The Large Load customers at issue in this proceeding would \nbe billed at SC3A or parent SC3A delivery rates at the Transmission voltage delivery \nlevel.    \nQ.  \nMS. TEIXEIRA, CONTINUING WITH NMPC, ARE THE RATES FOR HIGHER \nVOLTAGE CUSTOMERS CONSIDERABLY LOWER THAN THE LOWER \nVOLTAGE DISTRIBUTION RATES?  \nA. \nFor a customer billed at standard SC3A rates, the customer would pay a much lower \ndemand charge of $4.89 per maximum kW in the billing period at the Transmission level \nthan:  the $15.58 per maximum kW at the Secondary or Primary level and $5.42 at the Sub-\ntransmission level.  The monthly customer charge is higher at the Transmission level than \nat lower voltage levels but for a large load customer the customer charge would be an \ninsignificant portion of their monthly bill compared to the demand charge (approximately \n2% for a 100 MW large load customer, for example).  See below for an example:"},{"page":23,"startToken":4460,"endToken":4625,"text":"Attachment I \nPage 19 of 29 \n \n \n \nQ.  \nMS. TEIXEIRA, \nDO \nSC3A TRANSMISSION \nRATES \nINCLUDE ANY \nDISTRIBUTION-RELATED CHARGES? \nA.  \nYes, but only to a limited extent.  SC3A Transmission rates are primarily composed of \ntransmission-related costs.  However, Niagara Mohawk’s Embedded Cost of Service Study \nalso allocates a small amount of distribution-related costs to SC3A Transmission \ncustomers, including costs associated with metering, customer programs, and \nadministrative functions.  These costs are minimal relative to the overall cost allocation, \nwith the vast majority of costs allocated to SC3A Transmission customers being \ntransmission-related. \nQ.  \nMS. TEIXEIRA, CAN YOU PROVIDE A HYPOTHETICAL EXAMPLE OF WHAT \nTHE RESULTING CHARGE WOULD BE FOR A LARGE LOAD UNDER \nNMPC’S PSC SERVICE CLASSIFICATION SC 7 (PARENT SC3A), ASSUMING A \n100 MW LOAD AND 73,000 MWH PER MONTH UNDER THE LOWEST AND \nHIGHEST VOLTAGES RATES?  \nA.  \nYes.  Similar to the example above but for a customer on the SC7 (parent SC3A) rate, \nbelow are the monthly delivery charges at current rates.  See below for additional details:"},{"page":24,"startToken":4625,"endToken":4885,"text":"Attachment I \nPage 20 of 29 \n \n \nQ. \nWHAT DO THESE HYPOTHETICAL EXAMPLES BROADLY ILLUSTRATE? \nA. \nThese hypothetical rate scenarios broadly illustrate the impact of voltage differentiation on \nrates and the significantly lower demand charges applicable to a transmission level \ncustomer compared to a distribution customer based on PSC approved rates.  These \nscenarios demonstrate that there are lower charges applicable to a Large Load customer. \nQ. \nDO LARGE LOADS HAVE FLEXIBILITY TO CHOOSE AMONG SERVICE \nCLASSIFICATIONS? \nA. \nYes, generally speaking.  In accordance with applicable procedures for delivery service, \nLarge Loads and their LSEs may choose among the applicable classifications identified in \nrevised OATT Section 5.2.8.  For all of the Indicated NYTOs, these include a standard \ntransmission-voltage or large general service classification, a standby service classification \nand, for all Indicated NYTOs, an optional demand service classification.  The customer can \ngenerally select the classification that makes the most sense given its load profile, although \nthere may be instances in which the applicability criteria of the tariff limit some of the \noptions available. \nQ. \nHOW DO THESE CLASSIFICATIONS ACCOMMODATE A LARGE LOAD \nTHAT IS CURTAILED OR REDUCES ITS WITHDRAWALS VOLUNTARILY? \nA. \nUnder the PSC-approved rate classifications, standby and optional demand rates include \ndaily as-used demand charges.  Under these designs, the customer’s demand charges reflect \nits actual demand during each daily peak or super-peak period rather than a single monthly \nmaximum.  A high load-factor Large Load that is curtailed by the NYISO, or that \nvoluntarily reduces its withdrawals during the peak hours on any day, will pay lower \ndemand charges for that day."},{"page":25,"startToken":4885,"endToken":5157,"text":"Attachment I \nPage 21 of 29 \n \n \nQ. \nWOULD THE LARGE LOAD RECEIVE THE SAME RATE REDUCTION \nBENEFIT REGARDLESS OF WHETHER IT IS CURTAILED BY THE NYISO OR \nA UTILITY, OR IT VOLUNTARILY REDUCES ITS WITHDRAWALS? \nA. \nYes.  Any Large Load demand reduction would produce the same rate reduction benefit \nwhether it is directed by the NYISO or a utility, or it is the result of a voluntary reduction. \nQ. \nMR. MCNIERNEY, ARE THERE RATE OPTIONS THAT COULD ALLOW A \nFLEXIBLE LARGE LOAD TO LOWER ITS MONTHLY DELIVERY BILL BY \nREDUCING ITS DAILY PEAK DEMAND? \nA. \nYes.  NYSEG, as well as other Indicated NYTOs, offer Optional Demand Service/Standby \nService which can apply to a Large Load customer.  For example, with Optional Demand \nService/Standby Service, the conventional monthly non-coincident demand-charge \nstructure is replaced with a monthly contract demand charge and daily “as-used demand” \ncharges.  The Optional Demand Service/Standby as-used charges depend on the Large \nLoad customer’s measured demand during defined “On-Peak” and “Super-Peak” periods \nwhereas the standard Transmission level service class, by contrast, is based on monthly \nnon-coincident peak demand.  Accordingly, under Optional Demand Service/Standby, a \nsignificant portion of demand-related charges depend on what the Large Load customer \ndoes during these applicable periods (On-Peak and Super-Peak) on each day. \nQ. \nMR. MCNIERNEY, CAN YOU PROVIDE A HYPOTHETICAL EXAMPLE OF \nHOW A FLEXIBLE LARGE LOAD CAN LOWER ITS MONTHLY DELIVERY \nBILL UNDER NYSEG’S SC 15, OPTIONAL DEMAND SERVICE? \nA. \nYes.  Consider an example in which a Large Load is curtailed by the NYISO or a utility to \nzero for five weekdays during the billing period.  Since as-used demand charges are based"},{"page":26,"startToken":5157,"endToken":5471,"text":"Attachment I \nPage 22 of 29 \n \n \non the sum of the daily On-Peak or Super-Peak demand during the billing period, a \ncurtailment for a day reduces the On-Peak or Super-Peak demand by one day.  In a month \nthat has 20 days in which On-Peak demand is measured, at current NYSEG rates, a \ncustomer with 100 MW load in all peak hours would have an On-Peak as-used demand of \n20 X 100 MW = 2,000 MW.  If five days had no as-used demand due to curtailment, the \nOn-Peak as-used demand for the month would be 1,500 MW.  For a Large Load customer \nthat would otherwise take service under the NYSEG SC 7-4 rate, at the current NYSEG \nSC 15 On-Peak daily as-used rate of $0.06030 per kW, there would be a reduction of \n$30,150 in charges.  The reduction would be greater in months that had Super-Peak daily \nas-used demand in addition to On-Peak daily as-used demand. \nQ.     MS. TEIXEIRA, CAN YOU PROVIDE A HYPOTHETICAL EXAMPLE OF WHAT \nTHE RESULTING CHARGE WOULD BE FOR A LARGE LOAD UNDER \nNMPC’S PSC STANDARD SERVICE CLASSIFICATION SC3A VS UNDER SC 7 \n(PARENT SC3A), WHEN THE CUSTOMER HAS REDUCED LOAD IN \nRESPONSE TO INTERRUPTIBLE LOAD REDUCTION REQUESTS? \nA. \nYes, the chart below provides the total delivery charges in a month for a large load customer \nwhen a customer pays for As-used Daily Demand charges for 15 on-peak days of the month \ninstead of all the on-peak days of the month in the previous NMPC examples.  In this \ncomparison, the SC3A customer would pay the same amount of fixed charges regardless \nof reduced load due to curtailments by the NYISO because the demand charge is based on \nthe maximum demand in the billing period which has not changed (i.e., 100 MW in this \nexample).  But, the customer will pay less for As-used Daily Demand charges when \ncurtailed."},{"page":27,"startToken":5471,"endToken":5676,"text":"Attachment I \nPage 23 of 29 \n \n \n \nQ. \nWHAT DO THESE HYPOTHETICAL EXAMPLES BROADLY ILLUSTRATE? \nA. \nThese hypothetical rate scenarios illustrate that there are lower charges potentially \napplicable to a Large Load customer if it is subject to persistent curtailments or dispatch \nduring peak or off-peak hours on any given day. \nQ. \nWHAT PROBLEMS COULD OCCUR IF THE INDICATED NYTOS’ EXISTING \nDELIVERY \nRATES \nAND \nPSC \nRATEMAKING \nPROCESSES \nWERE \nDISTURBED? \nA. \nIn the case of settled rates, isolating the transmission component in the Indicated NYTOs’ \nPSC-approved delivery service could potentially undermine the associated settlements and \nthe exchanges of consideration that the settlement parties made to reach them.  In the case \nof litigated rates, FERC action could upset rates determined following the conclusion of \nextensive procedures.  Each joint proposal resolves the revenue requirement, cost \nallocation, and rate design for all classes as a package.  Isolating the transmission \ncomponent of one class’s rate could potentially leave the remaining costs, including that \nclass’s share of distribution, metering, customer service, and overhead costs, to be \nreallocated.  Changing rates for one or a few classes in isolation could potentially shift \ncosts among classes and violate revenue neutrality, potentially producing unjust and \nunreasonable rates for other customers, including for residential and small commercial"},{"page":28,"startToken":5676,"endToken":5936,"text":"Attachment I \nPage 24 of 29 \n \n \ncustomers.  Moreover, the Indicated NYTOs could have to re-open retail settlements to \nadjust existing rate classes in a revenue-neutral manner.  That process would require a \nsignificant, administratively inefficient undertaking, and would create needless uncertainty \nfor all rate classes.  Further, to the extent that certain subsections of customers are not \nincluded in the forecasts used to develop rates, there may need to be extensive rate changes.   \nQ. \nHOW WOULD A SEPARATE RATE AFFECT THE COLLECTION OF STATE \nPOLICY SURCHARGES? \nA. \nIt would likely disrupt their collection.  Many state policy costs are collected through \nsurcharges on delivery service.  For example, certain demand response costs, adjustments \nup or down associated with revenue decoupling mechanisms, recovery of certain deferrals, \nand NYSERDA Program costs, are examples of costs or adjustments passed through \ndelivery surcharges.  Surcharges are not an insignificant portion of customers’ overall \ndelivery charges and are necessary to achieve the overall retail cost allocation and rate \ndesign established in state regulatory proceedings.   \nIf a Large Load’s delivery service were replaced by an unbundled transmission rate, a \nsurcharge on delivery might no longer be available as a collection mechanism, even though \na retail sale would still be taking place and the State would retain jurisdiction over that \nretail sale.  The PSC might then have to change the collection mechanism, for example by \nreassigning those charges as commodity surcharges on the retail sale function.  Doing so \nwould affect competitive ESCOs and LSEs and every customer class and would potentially \nrequire the PSC to reexamine cost recovery for dozens of programs."},{"page":29,"startToken":5936,"endToken":6211,"text":"Attachment I \nPage 25 of 29 \n \n \nQ. \nWOULD AN UNBUNDLED TRANSMISSION RATE ELIMINATE THE NEED \nFOR STATE DELIVERY CHARGES? \nA. \nWhether an unbundled transmission rate would displace a PSC delivery rate is an open \nquestion.  If the Commission established a transmission rate but still permitted a \ndistribution charge, the PSC would need to authorize utility re-designed delivery rates to \nremove transmission costs and to avoid double recovery.  If the Commission established a \ntransmission rate and prohibited a delivery rate, Large Loads might no longer contribute to \ndistribution, metering, surcharges, and overhead costs that the PSC has allocated to them, \nand those costs would shift to other customers. \nVII. \nTHE INDICATED NYTOS’ REVISIONS TO ISO OATT SECTION 5 \nQ. \nPLEASE SUMMARIZE THE INDICATED NYTOS’ PROPOSED REVISIONS TO \nSECTION 5. \nA. \nThe revisions extend Section 5 to Eligible Customers serving Large Loads and reference \nthe applicable PSC-approved, or LIPA Board of Trustees-approved, service classifications \nand delivery rates.7  The revised Section 5 details applicable delivery service classifications \nand rates for retail access service, including delivery service irrespective of whether a retail \ncustomer takes commodity supply from an ESCO or under a utility’s POLR obligation, and \nto Firm and Non-Firm Withdrawal Service for Eligible Customers on behalf of Large Loads \nunder Attachment LL of the ISO OATT.  It also clarifies that Section 5 applies to Large \nLoads themselves to the extent they are Eligible Customers.   \n \n7  \nLIPA’s delivery service classifications and rates are subject to review and approval by the LIPA Board of \nTrustees.  Consistent with long-standing practice recognized by the Commission, LIPA rates are set forth in the ISO \nOATT section 5 are for informational purposes only."},{"page":30,"startToken":6211,"endToken":6507,"text":"Attachment I \nPage 26 of 29 \n \n \nQ. \nWHAT DO THE REVISIONS PROVIDE REGARDING THE CHARGES THAT \nAPPLY TO LARGE LOADS? \nA. \nAs reflected in the Revised Section 5.1.1, each retail access customer, including an Eligible \nCustomer serving a Large Load, is responsible for paying the Retail Transmission Service \nCharge to the affected Transmission Owner consistent with the rates, terms and conditions \nof that Transmission Owner’s retail tariff, as approved under applicable State law and \nreferenced in Sections 5.2 and 5.3.  An LSE serving the customer remains responsible for \nall applicable NYISO charges, including Transmission Usage Charges, billed under \nSection 2.7 and Attachment LL.  Revised Section 5.1.3 provides that each Transmission \nOwner may collect its Retail Transmission Service Charge directly from each customer \nthat takes service under its retail tariffs, including Eligible Customers serving Large Loads, \nand that the rates, terms, and conditions are those of the applicable retail tariff approved by \nthe PSC or the LIPA Board of Trustees. \nQ. \nWHAT OTHER CHANGES DO THE REVISIONS MAKE? \nA. \nThe revisions update each company-specific description in Section 5.2 to cite the current \nPSC tariffs and to note the applicability to Eligible Customers serving Large Loads under \nAttachment LL.  New Section 5.2.8 sets out the rates, terms, and conditions of service for \nEligible Customers taking service on behalf of Large Loads and lists the applicable service \nclassifications for each Transmission Owner.  New Section 5.2.9 reserves each \nTransmission Owner’s right to modify its rates, terms, and conditions, subject to required \napprovals or filings under the New York Public Service Law, the New York Public \nAuthorities Law, or the FPA as applicable.  The revisions also require Eligible Customers \nto satisfy applicable interconnection requirements, including under Attachments HH and"},{"page":31,"startToken":6507,"endToken":6775,"text":"Attachment I \nPage 27 of 29 \n \n \nLL, and require Eligible Customers serving Large Loads to execute the form of \nTransmission Service Agreement attached to the ISO OATT.  In addition, a new Section \n5.3 has been added to reference cost responsibility for Large Loads as further embodied by \nthe Large Load Cost Recovery Agreement (“CRA”) included at Section 44.16.9 (Appendix \n9) in the NYISO OATT to be executed between a Connecting Transmission Owner or \nAffected Transmission Owner and the Large Load Project.  Newly created section 5.4.1 \nrequires Transmission Owners to apply revenue credits or adjustments to prevent double \nrecovery of costs recovered under CRAs through FERC-jurisdictional wholesale \ntransmission rates.  Finally, newly created section 5.4.2 requires Transmission Owners to \nfile an annual informational report with FERC and the PSC to identify CRA revenues \nreceived by upgrade during the following year and demonstrate that appropriate revenue \ncredits have been or will be applied.  \nVIII. THE NYISO’S COMPANION FILING \nQ. \nWHAT DOES THE NYISO’S COMPANION SECTION 205 FILING PROPOSE? \nA. \nThe NYISO’s filing proposes new Attachment LL to the ISO OATT, including, inter alia, \nnew Firm Withdrawal Service and Non-Firm Withdrawal Service for Eligible Customers \nserving Large Loads. \nQ. \nHOW DO THE INDICATED NYTOS’ SECTION 5 REVISIONS RELATE TO THE \nNYISO’S FILING? \nA. \nThe two filings are complementary.  The NYISO’s charges do not address the embedded \ncost delivery charges that the utility holding the retail franchise applies under its PSC-\nauthorized service classifications.  Revised Section 5 fills that role by identifying the \ndelivery rates that apply to Eligible Customers serving Large Loads, whether they take"},{"page":32,"startToken":6775,"endToken":7040,"text":"Attachment I \nPage 28 of 29 \n \n \nFirm or Non-Firm Withdrawal Service.  Together, the filings specify every charge a Large \nLoad will pay:  NYISO market and ancillary charges under the NYISO’s tariffs, and \nembedded cost delivery charges under the referenced retail tariffs. \nQ. \nDOES CURTAILMENT OF A LARGE LOAD UNDER THE NYISO’S NON-FIRM \nSERVICE NECESSARILY REFLECT THE TRANSMISSION OWNER’S COST \nTO PROVIDE DELIVERY SERVICE? \nA. \nNo.  A Large Load that is using Non-Firm Withdrawal Service may be curtailed by the \nNYISO because of conditions on the Bulk Power System that are unrelated to the \nConnecting Transmission Owner’s obligation to deliver energy.  The Connecting \nTransmission Owner may be planning and building its local system to serve that Large \nLoad as a firm customer, consistent with the service the customer requested.  The pendency \nof firm service awaiting a non-local upgrade on an Affected Transmission Owner’s system \nmay thus have nothing to do with how the Connecting Transmission Owner provides \ndelivery service.  That is another reason why a discounted non-firm delivery rate, keyed to \nNYISO curtailments, would not necessarily reflect cost causation. \nQ. \nIS THERE TIME TO DEVELOP NEW RATES, IF ANY ARE NEEDED, BEFORE \nTHE NYISO’S NEW SERVICES TAKE EFFECT? \nA. \nYes.  The terms of the NYISO’s Non-Firm Withdrawal Service have been evolving until \nvery recently.  Under the NYISO’s proposal, the earliest that new Non-Firm Withdrawal \nServices would be available is for projects in the transition Large Load Integration Process \ncluster.  As filed, the NYISO’s process would result in Facilities Study completion and \nsecurity posting during or after the third quarter of 2028, which should precede service to"},{"page":33,"startToken":7040,"endToken":7077,"text":"Attachment I \nPage 29 of 29 \n \n \nnew Large Loads.  That leaves time for the PSC and the Indicated NYTOs to develop any \nnew rates that prove appropriate. \nIX. \nCONCLUSION \nQ. \nDOES THIS CONCLUDE THIS TESTIMONY? \nA. \nYes."},{"page":34,"startToken":7077,"endToken":7077,"text":""},{"page":35,"startToken":7077,"endToken":7233,"text":"UNITED STATES OF AMERICA\nBEFORE THE\nFEDERAL ENERGY REGULATORY COMMISSION\n)\nCentral Hudson Gas & Electric Corporation\n)\nConsolidated Edison Company of New York, Inc.\n)\nNew York State Electric & Gas Corporation\n)     Docket No.   ER27-___-000\nNiagara Mohawk Power Corp.\n)\nOrange and Rockland Utilities, Inc.\n)\nRochester Gas and Electric Corporation\n)\n)\nVERIFICATION OF CAROL TEIXEIRA\nSTATE OF PENNSYLVANIA\n)\n)\nCOUNTY OF DELAWARE\n)\nI, Carol Teixeira, being first duly sworn, state that I am the witness identified in the \nforegoing prepared testimony, and that the statements of fact in the testimony and supporting \nexhibits relating to my employer and the NYTOs as a collective group are true and correct to the \nbest of my knowledge, information, and belief.\nCarol Teixeira\nSUBSCRIBED AND SWORN before me\nthe 10th day of November, 2026\nNotary Public\nMy commission expires on:04/25/2028\nCarol  Teixeira\nPatrick  Wagner\nOnline Notary Public. This notarial act involved the use of\nonline audio/video communication technology. Notarization\nfacilitated by SIGNiX®"},{"page":36,"startToken":7233,"endToken":7389,"text":"UNITED STATES OF AMERICA\nBEFORE THE\nFEDERAL ENERGY REGULATORY COMMISSION\n)\nCentral Hudson Gas & Electric Corporation\n)\nConsolidated Edison Company of New York, Inc.\n)\nNew York State Electric & Gas Corporation\n)     Docket No.   ER27-___-000\nNiagara Mohawk Power Corp.\n)\nOrange and Rockland Utilities, Inc.\n)\nRochester Gas and Electric Corporation\n)\n)\nVERIFICATION OF YAN FLISHENBAUM\nSTATE OF PENNSYLVANIA\n)\n)\nCOUNTY OF DELAWARE\n)\nI, Yan Flishenbaum, being first duly sworn, state that I am the witness identified in the \nforegoing prepared testimony, and that the statements of fact in the testimony and supporting \nexhibits relating to my employer and the NYTOs as a collective group are true and correct to the \nbest of my knowledge, information, and belief.\nYan Flishenbaum\nSUBSCRIBED AND SWORN before me\nthe 11th day of November, 2026\nNotary Public\nMy commission expires on:04/25/2028\nYan  Flishenbaum\nPatrick  Wagner\nOnline Notary Public. This notarial act involved the use of\nonline audio/video communication technology. Notarization\nfacilitated by SIGNiX®"},{"page":37,"startToken":7389,"endToken":7541,"text":"• UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nCentral Hudson Gas & Electric Corporation \nConsolidated Edison Company of New York, Inc. \nNew York State Electric & Gas Corporation \nNiagara Mohawk Power Corp. \nOrange and Rockland Utilities, Inc. \nRochester Gas and Electric Corporation \nt• \nSTATE OF NEW YORK \nDocket No. ER27- -000 \nVERIFICATION OF STACY POWERS \nCOUNTY OF DUTCHESS \n) \n) \n)\n \n1, Stacy Powers, being first duly sworn, state that I \nam the witness identified in the \nforegoing prepared testimony, and that the statements of fact in the testimony and supporting \nexhibits relating to my employer and the NYTOs as a \ncollective group are true and correct to the \nbest of my knowledge, information, and belief. \nSUBSCRIBED AND SWORN before me \nthe\\ (:)  \nday of November, 2026 \n- • f\\kA\n. \nStacy Powers \nSARAH ELIZABEM P1ZZOLA \nNOTARY PUBLIC, STATE OF NEW YORK \nRegistration No. 02KE6325582 \nQualified in Dutchess County • \nCommission Expires June 1, 2027  \nMy commission expires on:"},{"page":38,"startToken":7541,"endToken":7556,"text":"Exhibit A \nThe NYTOs’ PSC Delivery Rates of the Applicable \nTransmission Owner to Large Loads"},{"page":39,"startToken":7556,"endToken":7564,"text":"Central Hudson \nService Classification No. 13: Transmission Service"},{"page":40,"startToken":7564,"endToken":7917,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:      246 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION \nREVISION:        25 \nINITIAL EFFECTIVE DATE: 09/01/2025 \n \nSUPERSEDING REVISION:        23 \nIssued in Compliance with Order in C. 24-E-0461 dated August 14, 2025 \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 13 \n \nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE \n \nAPPLICABLE TO USE OF SERVICE FOR \n \nSales and delivery of electric power supply by the Company or delivery of electric power supply provided by a Retail \nSupplier to industrial customers for: \n \nAll purposes. \n \nEffective March 31, 1991, regardless of the type of service offered, electric service utilized exclusively with such \nreligious purposes or utilized at such community residences, as defined in the Service Classification No. 1 Section \nentitled Applicable to Use of Service For, shall be charged at rates no greater than the rates or charges applicable to \nresidential customers receiving single phase service. \n \nEffective June 2, 1998, regardless of the type of service offered, electric service utilized by such veteran’s \norganizations, as defined in the Service Classification No. 1 section entitled Applicable to Use of Service For, shall \nbe charged at rates no greater than the rates or charges applicable to residential customers receiving single phase \nservice.  \n \nCHARACTER OF SERVICE \n \nContinuous, 60 cycle, three phase alternating current delivered at one transmission voltage, voltage depending on \navailability and the customer's requirements. \n \nWhen a customer provides all equipment necessary to take service (a) directly from a substation having a line-side \nvoltage of 69,000 volts or higher the Substation Rate will apply and (b) at a transmission voltage of 69,000 volts or \nhigher the Transmission Rate will apply. \n \n \nSTANDBY SERVICE \n \nCustomers served under this Service Classification can elect to take service under the rates of Service Classification \nNo. 14. \n \n \nMONTHLY RATE \n \n   Substation \n \n \n \nEffective \n \nEffective \n \nEffective \n \n \n \n \n \nSeptember 1, 2025 \nJuly 1, 2026 \n \nJuly 1, 2027 \n \n \n \n \n \nCustomer Charge  \n \n$9,700.00 \n \n$11,050.00 \n \n$12,500.00       \n \n \nDelivery Charges \n \n \n \nBasic Demand Charge per kW \n $12.26   \n \n12.74 \n \n \n12.87 \n \n \n \nReactive Demand per Rkva \n $0.83   \n \n$0.83 \n \n \n$0.83 \n \n Received: 08/27/2025 \n Status: EFFECTIVE \n Effective Date: 09/01/2025"},{"page":41,"startToken":7917,"endToken":8100,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:        246.1 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION \nREVISION:            28 \nINITIAL EFFECTIVE DATE: 09/01/2025 \n \nSUPERSEDING REVISION:             26 \nIssued in Compliance with Order in C. 24-E-0461 dated August 14, 2025 \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 13 (Cont’d) \n \nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d) \n \nMONTHLY RATE \n \n \nTransmission \n \n \n \nEffective \n \nEffective \n \nEffective \n \n     \n \n \n \nSeptember 1, 2025 \nJuly 1, 2026 \n \nJuly 1, 2027 \n \n \n \n \nCustomer Charge  \n \n$15,500.00 \n \n$18,000.00 \n \n$21,000.00 \n \nDelivery Charges \n \n \n \nBasic Demand Charge per kW \n$7.69 \n \n \n$8.04 \n \n \n$8.15  \n \n \n \nReactive Demand per Rkva \n$0.83 \n \n \n$0.83  \n \n \n$0.83   \n \n \n \n \n \nBills rendered shall be based on periodic meter readings as provided in General Information Section 13. \n \nELECTRIC BILL CREDIT \n \nThe Electric Bill Credit, as described in General Information Section 36.B, shall apply to all customers served under \nthis Service Classification. \n \nSYSTEM BENEFITS CHARGE \n \nThe System Benefits Charge, as described in General Information Section 36.A, shall apply to all electricity delivered \nunder this Service Classification. \n \n \n Received: 08/27/2025 \n Status: EFFECTIVE \n Effective Date: 09/01/2025"},{"page":42,"startToken":8100,"endToken":8426,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:        247 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION \nREVISION:          19 \nINITIAL EFFECTIVE DATE: 08/01/2024 \n \nSUPERSEDING REVISION:          17 \nIssued in Compliance with Order in C. 23-E-0418 dated July 18, 2024 \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 13 (Cont’d) \n \nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d) \n \nMISCELLANEOUS CHARGES \n \nThe provisions of the Company’s Miscellaneous Charges, as described in General Information Section 29, shall apply \nto all electricity delivered under this Service Classification. \n \nENERGY SUPPLY \n \nThe provisions of the Company’s Hourly Pricing Provision (HPP), as described in Special Provision 13.9, shall apply \nto electricity provided and sold by the Company under this Service Classification.  Customers participating in the \nRetail Access Program as described in General Information Section 35 shall not be subject to the HPP. \n \nMERCHANT FUNCTION CHARGE \n \nThe Merchant Function Charge, as described in General Information Section 36.E, shall apply to all electricity \ndelivered under this Service Classification. \n \nREVENUE DECOUPLING MECHANISM \n \nThe Revenue Decoupling Mechanism Adjustment, as described in General Information Section 36.G, shall apply to \nall electricity delivered under this Service Classification. \n \nOTHER CHARGES \n \nCustomers taking service under this Service Classification may be subject to other rates and charges as applicable \naccording to the provisions of the General Information Section of this rate schedule.  \n \nINCREASE IN RATES AND CHARGES \n \nThe rates and charges under this Service Classification, including the minimum charge, Electric Bill Credit System \nBenefits Charge, Miscellaneous Charges, energy supply charges under Special Provision 13.9, if applicable, Merchant \nFunction Charge, Revenue Decoupling Mechanism and other charges pursuant to the General Information Section (as \napplicable) are increased pursuant to General Information Section 30 to reflect the tax rates applicable within the \nmunicipality where the customer takes service. \n \nMINIMUM CHARGE \n \nThe Customer Charge, the Basic Demand Charge, and any non-bypassable charges pursuant to the General \nInformation Section of this rate schedule. \n \n \n \n \n \n \n \n \n \n Received: 07/30/2024 \n Status: EFFECTIVE \n Effective Date: 08/01/2024"},{"page":43,"startToken":8426,"endToken":8916,"text":"PSC NO: 15 ELECTRICITY                                                                                                                  LEAF:         248 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION \n  \nREVISION:             6 \nINITIAL EFFECTIVE DATE: 09/01/2025  \n \nSUPERSEDING REVISION:             5 \nIssued in Compliance with Order in C. 24-E-0461 dated August 14, 2025 \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 13 (Cont’d) \n \nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d) \n \nDETERMINATION OF DEMAND \n \nThe Basic Active Demand will be the highest 15-minute integrated kilowatt demand established during the month \nfor which the bill is rendered, but not less than 500 kilowatts. \n \nThe Reactive Demand will be the highest 15-minute integrated kilovoltamperes of lagging reactive demand \nestablished during the month less one-half of the highest 15-minute integrated kilowatt demand established during \nthat month. \n \nEffective May 1, 2010, the Reactive Demand will be the highest 15-minute integrated kilovoltamperes of lagging \nreactive demand established during the month less one-third of the highest 15-minute integrated kilowatt demand \nestablished during that month. \n \nMETERING REQUIREMENT \n \nCustomers taking service under this Special Provision must have in place an interval meter, and have \ntelecommunications to the meter, that is compatible with the Company’s MV-90 data acquisition system. On and \nafter May 1, 2013, cellular communications to the meter will be installed by the Company for all new interval meter \ninstallations. Should the customer’s premises not have adequate signal strength and require a dedicated phone line, \nthe Company will arrange for the installation of, and be responsible for the ownership and maintenance of, a \ndedicated phone line. In addition to the monthly customer charge, customers will be assessed an incremental \nmonthly charge of $3.00 for customers where the Company has provided cellular communications to the meter. If a \nnon-cellular enabled interval meter is installed and the customer’s dedicated phone line is not installed or \noperational, for reasons not caused by the Company’s equipment, when the Company attempts to read the meter, the \ncustomer shall be responsible for resolution of the problem, and the customer will be assessed an $80.00 on-site \nmeter reading charge each monthly cycle until the condition is corrected \n \nTERMS OF PAYMENT \n \nBills are due when personally served or three days after mailing.  Bills shall be subject to a late payment charge in \naccordance with General Information, Section 16, if payment is not made by the date specified on the bill which date \nshall be not less than 20 days from the due date. \n \nTERM \n \nA minimum of one year from commencement of service under this classification and successive annual terms \nthereafter.  A customer cannot resume service within one year at the same location under this classification if service \nhas been taken during the intervening period under any other service classification.   For a customer served on \nService Classification No. 3 (Substation or Transmission Service) prior to the effective date of this service \nclassification, the one year minimum term would include the period served on Service Classification No. 3.  \n \n \n      \n \n Received: 08/27/2025 \n Status: EFFECTIVE \n Effective Date: 09/01/2025"},{"page":44,"startToken":8916,"endToken":9015,"text":"Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York\n..DID:        17612\n..TXT: PSC NO: 15   ELECTRICITY                        LEAF: 249\nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION         REVISION: 2\nINITIAL EFFECTIVE DATE: 11/01/01         SUPERSEDING REVISION: 1\nSTAMPS: Issued in Compliance with Order in C.00-E-1273 dated October 25, 2001\nRECEIVED: 10/31/01 STATUS: Effective EFFECTIVE: 11/01/01\nSERVICE CLASSIFICATION NO. 13 (Cont'd)\nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)\nReserved for future use.\n Received: 10/31/2001 \n Status: EFFECTIVE \n Effective Date: 11/01/2001 \nIssued in Compliance with Order in C.00-E-1273 dated October 25, 2001"},{"page":45,"startToken":9015,"endToken":9114,"text":"Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York\n..DID:        17614\n..TXT: PSC NO: 15   ELECTRICITY                        LEAF: 250\nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION         REVISION: 2\nINITIAL EFFECTIVE DATE: 11/01/01         SUPERSEDING REVISION: 1\nSTAMPS: Issued in Compliance with Order in C.00-E-1273 dated October 25, 2001\nRECEIVED: 10/31/01 STATUS: Effective EFFECTIVE: 11/01/01\nSERVICE CLASSIFICATION NO. 13 (Cont'd)\nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)\nReserved for future use.\n Received: 10/31/2001 \n Status: EFFECTIVE \n Effective Date: 11/01/2001 \nIssued in Compliance with Order in C.00-E-1273 dated October 25, 2001"},{"page":46,"startToken":9114,"endToken":9206,"text":"Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York\n..DID:        17615\n..TXT: PSC NO: 15   ELECTRICITY                        LEAF: 251\nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION         REVISION: 2\nINITIAL EFFECTIVE DATE: 11/01/01         SUPERSEDING REVISION: 1\nSTAMPS: Issued in Compliance with Order in C.00-E-1273 dated October 25, 2001\nRECEIVED: 10/31/01 STATUS: Effective EFFECTIVE: 11/01/01\nSERVICE CLASSIFICATION NO. 13 (Cont'd)\nReserved for future use.\n Received: 10/31/2001 \n Status: EFFECTIVE \n Effective Date: 11/01/2001 \nIssued in Compliance with Order in C.00-E-1273 dated October 25, 2001"},{"page":47,"startToken":9206,"endToken":9619,"text":"PSC NO: 15 ELECTRICITY \n \n \n \n \n \n \n \n         LEAF:  252 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION  \n \n \n REVISION:      9 \nINITIAL EFFECTIVE DATE: 10/01/2025                                                              SUPERSEDING REVISION:      8 \nIssued in Compliance with Order in Case 22-E-0236 dated October 17, 2024 \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 13 (Cont’d) \n \nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d) \n \n \nSPECIAL PROVISIONS \n \nThe numbering of the paragraphs hereunder begins with the above service classification number. \n \n13.1 \nA customer who takes service under this service classification that has EV charging sites will be eligible for \nthe Demand Charge Rebate as follows: To be eligible for the Rebate, a customer with an EV charging site \nis required to have a Charging Ratio of 50 percent or greater.  For customers that separately meter their EV \nload, the Charging Ratio will be equal to 100%. For all other Customers, the Charging Ratio is defined as \nthe ratio of the sum of the EV charging capacity in kW to the sum of the maximum simultaneous demand \nof all load on the account in kW.  The Charging Ratio shall be determined at the time of application and \nshall remain the Charging Ratio until such time that the Customer provides a new load letter with additional \nelectrification plans; however, the Company reserves the right to re-evaluate the Charging Ratio and \nprogram eligibility subsequent to application for service.  For Customers with a Charging Ratio of 50 \npercent or greater, the Rebate will be determined for each billing period by taking the billed Demand \nDelivery Charges times the Charging Ratio times 50%. The calculation of the Demand Charge Rebate shall \nnot include delivery surcharges, supply charges, or any other demand-measured charges included on a \ncustomer’s bill. \nCustomers participating in the Company’s DCFC per-plug incentive program will have a one-time option \nto either continue participating in the Program for the remainder of the Customer’s eligibility period or to \nbegin receiving the Rebate. Customers currently enrolled in the Excelsior Jobs Program pursuant to Special \nProvision 41 are ineligible to receive the Rebate. Effective October 1, 2025, the Rebate will no longer be \nmade available to new participants. Any existing participants have the option to enroll in the EV-PIR, as \ndescribed in General Information Section 52, for their energy and demand delivery charges. The Rebate for \nexisting participants will continue until either the first full billing cycle under the EV-PIR or December 1, \n2025, whichever happens first. \n \n \n \n \n \n \n Received: 07/03/2025 \n Status: EFFECTIVE \n Effective Date: 10/01/2025"},{"page":48,"startToken":9619,"endToken":9730,"text":"PSC NO: 15 ELECTRICITY \n \n \n \n \n \n \n \n         LEAF:  253 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION  \n \n \n REVISION:     6 \nINITIAL EFFECTIVE DATE: 01/01/12                                                                   SUPERSEDING REVISION:     5 \nIssued by: Michael L. Mosher, Vice President, Poughkeepsie, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 13 (Cont’d) \n \nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d) \n \n \nSPECIAL PROVISIONS \n \n \n13.2 \nFor customers who are taking transmission service and who are leasing substation equipment from the \nCompany, measured billing units will be multiplied by 1.004 to recover demand and energy losses in the \ntransformation system. \n \n \n13.3 \nNot in use. \n \n \n Received: 09/22/2011 \n Status: EFFECTIVE \n Effective Date: 04/01/2012 \nEffective date postponed to 04/01/2012. See Supplement No. 63."},{"page":49,"startToken":9730,"endToken":9809,"text":"Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York\n..DID:        18285\n..TXT: PSC NO: 15   ELECTRICITY                        LEAF: 254\nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION         REVISION: 6\nINITIAL EFFECTIVE DATE: 05/01/02         SUPERSEDING REVISION: 5\nSTAMPS:\nRECEIVED: 02/01/02 STATUS: Effective EFFECTIVE: 05/01/02\nSERVICE CLASSIFICATION NO. 13 (Cont'd)\nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)\nSPECIAL PROVISIONS (Cont'd)\n13.3\nNot in Use.\n Received: 02/01/2002 \n Status: EFFECTIVE \n Effective Date: 05/01/2002"},{"page":50,"startToken":9809,"endToken":9888,"text":"Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York\n..DID:        18286\n..TXT: PSC NO: 15   ELECTRICITY                        LEAF: 255\nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION         REVISION: 6\nINITIAL EFFECTIVE DATE: 05/01/02         SUPERSEDING REVISION: 5\nSTAMPS:\nRECEIVED: 02/01/02 STATUS: Effective EFFECTIVE: 05/01/02\nSERVICE CLASSIFICATION NO. 13 (Cont'd)\nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)\nSPECIAL PROVISIONS (Cont'd)\n13.4\nNot in Use.\n Received: 02/01/2002 \n Status: EFFECTIVE \n Effective Date: 05/01/2002"},{"page":51,"startToken":9888,"endToken":9967,"text":"Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York\n..DID:        18287\n..TXT: PSC NO: 15   ELECTRICITY                        LEAF: 256\nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION         REVISION: 7\nINITIAL EFFECTIVE DATE: 05/01/02         SUPERSEDING REVISION: 6\nSTAMPS:\nRECEIVED: 02/01/02 STATUS: Effective EFFECTIVE: 05/01/02\nSERVICE CLASSIFICATION NO. 13 (Cont'd)\nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)\nSPECIAL PROVISIONS (Cont'd)\n13.4\nNot in Use.\n Received: 02/01/2002 \n Status: EFFECTIVE \n Effective Date: 05/01/2002"},{"page":52,"startToken":9967,"endToken":10046,"text":"Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York\n..DID:        18288\n..TXT: PSC NO: 15   ELECTRICITY                        LEAF: 257\nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION         REVISION: 4\nINITIAL EFFECTIVE DATE: 05/01/02         SUPERSEDING REVISION: 3\nSTAMPS:\nRECEIVED: 02/01/02 STATUS: Effective EFFECTIVE: 05/01/02\nSERVICE CLASSIFICATION NO. 13 (Cont'd)\nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)\nSPECIAL PROVISIONS (Cont'd)\n13.4\nNot in Use. \n Received: 02/01/2002 \n Status: EFFECTIVE \n Effective Date: 05/01/2002"},{"page":53,"startToken":10046,"endToken":10126,"text":"PSC NO: 15 ELECTRICITY \n \n \n \n \n \n \n   \n         LEAF:  258 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION  \n \n               REVISION:      9 \nINITIAL EFFECTIVE DATE: 04/01/12        \n                                            SUPERSEDING REVISION:      7 \nIssued in Compliance with Orders Establishing Filing Requirements Dated November 21, 2011 and March 16, 2012 \nIssued by: Michael L. Mosher, Vice President, Poughkeepsie, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 13 (Cont’d) \n \nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d) \n \nSPECIAL PROVISIONS  (Cont’d) \n \n13.5 \nNot in use. \n \n \n Received: 03/28/2012 \n Status: EFFECTIVE \n Effective Date: 04/01/2012"},{"page":54,"startToken":10126,"endToken":10202,"text":"PSC NO: 15 ELECTRICITY \n \n \n \n \n \n \n   \n         LEAF:  259 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION  \n \n   \nREVISION:      7 \nINITIAL EFFECTIVE DATE: 04/01/12                                                                 SUPERSEDING REVISION:      5 \nIssued in Compliance with Orders Establishing Filing Requirements Dated November 21, 2011 and March 16, 2012 \nIssued by: Michael L. Mosher, Vice President, Poughkeepsie, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 13 (Cont’d) \n \nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d) \n \nReserved for future use. \n Received: 03/28/2012 \n Status: EFFECTIVE \n Effective Date: 04/01/2012"},{"page":55,"startToken":10202,"endToken":10301,"text":"Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York\n..DID:        17575\n..TXT: PSC NO: 15   ELECTRICITY                        LEAF: 260\nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION         REVISION: 3\nINITIAL EFFECTIVE DATE: 11/01/01         SUPERSEDING REVISION: 2\nSTAMPS: Issued in Compliance with Order in C.00-E-1273 dated October 25, 2001\nRECEIVED: 10/31/01 STATUS: Effective EFFECTIVE: 11/01/01\nSERVICE CLASSIFICATION NO. 13 (Cont'd)\nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)\nReserved for future use.\n Received: 10/31/2001 \n Status: EFFECTIVE \n Effective Date: 11/01/2001 \nIssued in Compliance with Order in C.00-E-1273 dated October 25, 2001"},{"page":56,"startToken":10301,"endToken":10365,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:      261 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION \nREVISION:          3 \nINITIAL EFFECTIVE DATE: 01/01/14 \n \nSUPERSEDING REVISION:          2 \nIssued by: Michael L. Mosher, Vice President, Poughkeepsie, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 13 (Cont’d) \n \nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d) \n \nSPECIAL PROVISIONS (Cont’d) \n \n13.6 \nNot in use. \n \n \n Received: 11/21/2013 \n Status: EFFECTIVE \n Effective Date: 01/01/2014"},{"page":57,"startToken":10365,"endToken":10425,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:      262 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION \nREVISION:          11 \nINITIAL EFFECTIVE DATE: 01/01/14 \n \nSUPERSEDING REVISION:          10 \n \nIssued by: Michael L. Mosher, Vice President, Poughkeepsie, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 13 (Cont’d) \n \nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d) \n \nReserved for future use. \n Received: 11/21/2013 \n Status: EFFECTIVE \n Effective Date: 01/01/2014"},{"page":58,"startToken":10425,"endToken":10485,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:          263 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION \nREVISION:          3 \nINITIAL EFFECTIVE DATE: 01/01/14 \n \nSUPERSEDING REVISION:          2 \nIssued by: Michael L. Mosher, Vice President, Poughkeepsie, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 13 (Cont’d) \n \nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d) \n \nReserved for future use.  \n \n \n \n \n Received: 11/21/2013 \n Status: EFFECTIVE \n Effective Date: 01/01/2014"},{"page":59,"startToken":10485,"endToken":10545,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:      264 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION \nREVISION:          4 \nINITIAL EFFECTIVE DATE: 01/01/14 \n \nSUPERSEDING REVISION:          3 \nIssued by: Michael L. Mosher, Vice President, Poughkeepsie, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 13 (Cont’d) \n \nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d) \n \nReserved for future use.  \n \n Received: 11/21/2013 \n Status: EFFECTIVE \n Effective Date: 01/01/2014"},{"page":60,"startToken":10545,"endToken":10609,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:          265 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION \nREVISION:          4 \nINITIAL EFFECTIVE DATE: 01/01/14 \n \nSUPERSEDING REVISION:          3 \nIssued by: Michael L. Mosher Vice President, Poughkeepsie, New York \n \n \n \nSERVICE CLASSIFICATION NO. 13 (Cont’d) \n \nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d) \n \nSPECIAL PROVISIONS (Cont’d) \n \n \n13.7 \nNot in Use \n \n \n \n \n Received: 11/21/2013 \n Status: EFFECTIVE \n Effective Date: 01/01/2014"},{"page":61,"startToken":10609,"endToken":10712,"text":"Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York\n..DID:        17579\n..TXT: PSC NO: 15   ELECTRICITY                        LEAF: 266\nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION         REVISION: 3\nINITIAL EFFECTIVE DATE: 11/01/01         SUPERSEDING REVISION: 2\nSTAMPS: Issued in Compliance with Order in C.00-E-1273 dated October 25, 2001\nRECEIVED: 10/31/01 STATUS: Effective EFFECTIVE: 11/01/01\nSERVICE CLASSIFICATION NO. 13 (Cont'd)\nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)\nSPECIAL PROVISIONS (Cont'd)\n13.8 Not in Use.\n Received: 10/31/2001 \n Status: EFFECTIVE \n Effective Date: 11/01/2001 \nIssued in Compliance with Order in C.00-E-1273 dated October 25, 2001"},{"page":62,"startToken":10712,"endToken":10811,"text":"Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York\n..DID:        14674\n..TXT: PSC NO: 15   ELECTRICITY                        LEAF: 267\nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION         REVISION: 2\nINITIAL EFFECTIVE DATE: 02/01/01         SUPERSEDING REVISION: 1\nSTAMPS: Issued in Compliance with Order in C.96-E-0909 dated January 26, 2001\nRECEIVED: 01/31/01 STATUS: Effective EFFECTIVE: 02/01/01\nSERVICE CLASSIFICATION NO. 13 (Cont'd)\nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)\nReserved for future use.\n Received: 01/31/2001 \n Status: EFFECTIVE \n Effective Date: 02/01/2001 \nIssued in Compliance with Order in C.96-E-0909 dated January 26, 2001"},{"page":63,"startToken":10811,"endToken":11269,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:      267.1 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION \nREVISION:             6 \nINITIAL EFFECTIVE DATE: 07/01/09 \n \nSUPERSEDING REVISION:             5 \nIssued in Compliance with Order in C.08-E-0887 dated June 22, 2009 \nIssued by: Michael L. Mosher, Vice President, Poughkeepsie, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 13 (Cont’d) \n \nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d) \n \nSPECIAL PROVISIONS (Cont’d) \n \n13.9 \nHOURLY PRICING PROVISION \n \nCustomers taking service under this Service Classification and electing to purchase their energy \nrequirements from the Company will be billed for these requirements based on charges set on an hourly \nbasis according to the market price of electricity described below.  The market price of electricity will be \nthe hourly Day-Ahead Locational Based Market Price (DAM) as set forth by the New York State \nIndependent System Operator (NYISO) for Central Hudson, Hudson Valley, Zone G (Zone G).  The source \nof the hourly prices will be the NYISO website for the DAM.  Such prices will be adjusted by the Factor of \nAdjustment set forth in General Information Section 29.  \n \nCustomers taking service under this Special Provision will also be subject to charges for energy balancing \nas well as non-energy components of electric power supply, such as capacity, ancillary services and \nallowances for working capital costs and bad debts.  \n \nPrior to May 1, 2011, these charges will be recovered through the HPP UCAP Charge, which will be \ndetermined on a monthly basis, coincident with the development of the components of the Energy Cost \nAdjustment Mechanism, as described in General Information Section 29, will be stated in whole $0.00001 \namounts per kilowatthour and will be filed with the Public Service Commission on the Statement of Market \nPrice Charge and Market Price Adjustment.  The UCAP Charge will be calculated as the sum of: \n \n \n \n(A) \nAn energy balancing component calculated by subtracting the DAM \nfrom the Real-Time LBMP (RTM) as set forth by the NYISO for Zone G for each hour in \nthe current month, multiplying the difference by any purchases or sales made by the \nCompany in the real-time market for load balancing purposes and dividing the net result \nby the estimate of full service sales, including HPP sales, described in General \nInformation Section 29; and, \n \n(B) \nA component for capacity charges determined by taking the sum of HPP customers’ \nestimated unforced capacity (UCAP) requirements multiplied by the monthly NYISO \nSpot Auction price for the New York Control Area (NYCA); and, \n \n(C) \nA component for ancillary service charges, including NYPA Transmission Access \nCharges (NTAC), calculated by taking the sum of such charges incurred by the Company \nand dividing by the estimate of full service sales, including HPP sales, described in \nGeneral Information Section 29; and, \n Received: 06/30/2009 \n Status: EFFECTIVE \n Effective Date: 07/01/2009"},{"page":64,"startToken":11269,"endToken":12007,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:      267.2 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION \nREVISION:             22 \nINITIAL EFFECTIVE DATE: 07/01/2025 \n \nSUPERSEDING REVISION:            21 \nIssued in Compliance with Order in C. 15-E-0751 & 15-E-0082, dated October 17, 2024. \n \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \nSERVICE CLASSIFICATION NO. 13 (Cont’d) \n \nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d) \n \nSPECIAL PROVISIONS (Cont’d) \n \n13.9 \nHOURLY PRICING PROVISION (Cont’d) \n \n(D) \nAllowances for working capital costs and bad debts equal to the average per kWh rate for    \n               these charges as otherwise included in the Market Price Charge (MPC) \n \n \nFor each billing period, the customer’s total energy supply cost will be calculated as the sum of: (1) the hourly \nDAM multiplied by the customer’s hourly measured loads, as adjusted by the Factor of Adjustment set forth \nin General Information Section 29, and (2) the HPP UCAP Charge per kWh multiplied by the customer’s \ntotal measured load in kilowatthours. \n \nOn and after May 1, 2011, capacity charges will be recovered through a separate charge, HPP UCAP.  Each \ncustomer’s capacity charge will be calculated as the product of the customer’s demand during the previous \nsummer’s ICAP market peak hour, as adjusted pursuant to the ICAP market peak load forecast for the \ncorresponding capability period and NYISO UCAP requirements, and the monthly NYISO Spot Auction \nprice for the capacity zone(s) from which the capacity is acquired pursuant to the requirements of the NYISO \nfor the prior calendar month.  The HPP UCAP will be stated in whole $0.01 amounts per kilowatt and will \nbe filed with the Public Service Commission on the Statement of Market Price Charge and Market Price \nAdjustment.    \n \nThe HPP UCAP Charge will be renamed the HPP Charge and will continue to recover charges for energy \nbalancing, ancillary services, allowances for working capital and bad debts according to the provisions \nprovided above. \n \nEffective April 1, 2017, the HPP Charge will be increased by a component designed to recover or refund the \ncosts or benefits of Renewable Energy Credits (REC’s), Zero Emissions Credits (ZEC’s) and Alternative \nCompliance Payments (ACP’s) for obligation years 2024 and prior, and the sale and transfer of Tier 1 VDER \nRECs  pursuant to Case 15-E-0302. Pursuant to Case 18-E-0071, the HPP Charge shall also be increased to \nreflect the costs of Offshore Wind Renewable Energy Credits (OREC’s). In addition, pursuant to Case 15-E-\n0751, the CDG H-Value compliance obligation including associated carrying charges calculated at the other \ncustomer capital rate will be recovered through this component. The REC/ZEC/ACP component, including \nan allowance for bad debts will be determined on an annual basis. A reconciliation of recoveries (eleven \nmonths actual, one month forecast) will also be performed annually, with any over or under recoveries \nincluded in the development of succeeding rates. Total costs will be divided by an estimate of billed sales for \nthe collection period. The factor so determined will be stated in whole $0.00001 amounts per kilowatt-hour \nand will be filed on the Statement of Market Price Charges. The REC/ZEC/OREC/ACP component shall be \nfiled to become effective with the eighth billing batch of April. \n \nFor billing purposes, REC/ZEC/OREC/ACP cost recovery will be included in the HPP Charge, with the \ncombined amount shown as one line item on customer bills until December 31, 2024, after which the ACP \ncost recovery will no longer be included in the HPP charge. \n \nEffective November 1, 2017, the HPP Charge will be increased by a component designed to recover the \nmarket value of the compensation paid to customers under General Information Section 48.B for the \nEnvironmental Component related to the purchase of generation.  This component will be determined by \ntaking the market value of the compensation paid and dividing by the estimate of full service sales, including \nHPP sales, as described in General Information Section 29 until December 31, 2024, after which the \nEnvironmental Component will be removed from the HPP charge and recovered through the REC charge. \n \nFor each billing period, the customer’s total energy supply cost will be calculated as the sum of: (1) the hourly \nDAM multiplied by the customer’s hourly measured loads, as adjusted by the Factor of Adjustment set forth \nin General Information Section 29, (2) the customer’s HPP UCAP, and (3) the HPP Charge per kWh \nmultiplied by the customer’s total measured load in kilowatthours. \n Received: 06/16/2025 \n Status: EFFECTIVE \n Effective Date: 07/01/2025"},{"page":65,"startToken":12007,"endToken":12371,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:        267.3 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                             REVISION:              5           \nINITIAL EFFECTIVE DATE: January 1, 2014                                              SUPERSEDING REVISION:              4        \nIssued by: Michael L. Mosher, Vice President, Poughkeepsie, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 13 (Cont’d) \n \nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE  (Cont’d) \n \n \nSPECIAL PROVISIONS (Cont'd) \n \n13.10 \nEmergency Demand Response Program \n \nA customer who can purchase electric power supply from the Company under this Service Classification \nmay elect to designate a portion of his load as curtailable and receive a billing credit subject to the terms \ndefined below.  The minimum curtailable load is 100 kW.  Customers selecting this Special Provision must \nhave in place an interval meter pursuant to the Metering Requirements section of the parent service \nclassification and possess a fax machine with a dedicated phone line.  Participating customers will be \nresponsible for all metering and communication costs not otherwise covered by NYSERDA or any other \nsource. \n \nCentral Hudson will process customer applications to the EDRP program within seven (7) business days \nafter the customer submits a completed application, subject to any processing time required by the NYISO. \n \nProgram Description \n \nThe Central Hudson Emergency Demand Response Program (EDRP) will operate in conjunction with the \nNew York Independent System Operator (NYISO) EDRP.  The NYISO will notify Curtailment Service \nProviders (CSP), which includes the Company as a load serving entity, that the NYISO EDRP has been \nimplemented and that CSPs should produce real-time, verified reductions of at least 100 kW. \n \nThe Company will provide as much notice in advance to customers to curtail, however, this is subject to the \nminimum of 2 hours notice to the Company by the NYISO.  Implementation for the EDRP will occur due \nto the following conditions: \n \na) \nan in-day peak hour forecast response to an operating reserve shortage, as set forth in \nSection 4.1 of the NYISO Emergency Operations Manual; or \n \nb) \nin conjunction with the NYISO’s call for special case resources as set forth in the NYISO \nICAP Manual; or \n \nc) \nin response to a major state of emergency as set forth in Section 3.2 of the NYISO \nEmergency Operations Manual; or \n Received: 11/21/2013 \n Status: EFFECTIVE \n Effective Date: 01/01/2014"},{"page":66,"startToken":12371,"endToken":12715,"text":"Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York\n..DID:        18970\n..TXT: PSC NO: 15   ELECTRICITY                        LEAF: 267.4\nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION         REVISION: 2\nINITIAL EFFECTIVE DATE: 05/01/02         SUPERSEDING REVISION: 1\nSTAMPS: Issued in Compliance with Order in C.02-E-0113 dated April 24, 2002\nRECEIVED: 04/26/02 STATUS: Effective EFFECTIVE: 05/01/02\nSERVICE CLASSIFICATION NO. 13 (Cont'd)\nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)\nSPECIAL PROVISIONS (Cont'd)\n13.10 Emergency Demand Response Program (Cont'd)\nd)\nat the NYISO's discretion to relieve system or zonal\nemergencies.\nProgram participation is voluntary and no penalties will be assessed for\nthe failure to curtail load.  Customers are encouraged to participate in\nmultiple load curtailment programs but will be reimbursed only for the\nhighest amount under any one program.\nLoad data will be provided to the NYISO by the Company, within 45 days\nof the event for verification.\nA customer may meet the load curtailment requirement of this program by\nreducing electric usage or by displacing usage through the operation of\non-site generating equipment located on its premises.\nIf the customer has an on-site generator, at the Company's discretion,\nmetering of the customer's generator may be done in order to compare the\ncustomer base load to customer load reduction, as determined by the\nNYISO.  The Company shall have the right to inspect its facilities on\nthe customer's property and customer's facilities at reasonable times.\nThe Company will have access to customer load data in order to determine\nif the customer has met its obligation to reduce load.  Load reductions\nwill be evaluated via the Customer Baseline (CBL) methodology contained\nin the NYISO EDRP Operating Manual.\nRates and Payments\nCustomers will be paid a sum equal to 90% of that paid to the Company by\nthe NYISO for the customers' load reduction. The Company's payment to\nthe customer will be contingent on the NYISO's payment to the Company.\n Received: 04/26/2002 \n Status: EFFECTIVE \n Effective Date: 05/01/2002 \nIssued in Compliance with Order in C.02-E-0113 dated April 24, 2002"},{"page":67,"startToken":12715,"endToken":13082,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:        267.5 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                             REVISION:              3  \nINITIAL EFFECTIVE DATE: January 1, 2014                                              SUPERSEDING REVISION:              2 \nIssued by: Michael L. Mosher, Vice President, Poughkeepsie, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 13 (Cont’d) \n \nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE  (Cont’d) \n \n \nSPECIAL PROVISIONS (Cont'd) \n \n13.11 \nDay-Ahead Demand Response Program (DADRP) \n \nA customer who purchases electric power supply from the Company under this Service Classification and \nis capable of curtailing 1 MW of load may elect to participate in the NYISO’s Day-Ahead Demand \nResponse Program by submitting day-ahead demand reduction bids in a form prescribed by the Company.  \nCustomers selecting this Special Provision must have in place an interval meter pursuant to the Metering \nRequirements section of the parent service classification and possess a fax machine with a dedicated phone \nline.  Participating customers will be responsible for all metering and communication costs not otherwise \ncovered by NYSERDA or any other source. Customers must be capable of curtailing demand for purposes \nof bidding into the Day-Ahead Market. \n \n \nTerm of Service \nService will be available under this Special Provision seven days after the customer supplies a completed \napplication subject to any additional processing time required by the NYISO.  Customers may terminate \nservice under this Special Provision upon written notice to the Company. \n \n \nDefinitions \n \nThe following definitions are applicable under this Special Provision: \n \n \nBid: The customer’s load reduction nomination in kW for the Dispatch Day. \n \nBidding Day: The day on which the customer submits its Bid to the Company, two days prior to the \nDispatch Day. \n \nCalculated Load Reduction: The difference between the Customer Baseline Load and the customer’s actual \nmetered load on an hourly basis.  The Calculated Load Reduction shall not be less than zero. \n \nCustomer Baseline Load (CBL): Average hourly energy consumption, rounded to the nearest kWh, for \neach of the 24 hours in a day calculated in accordance with the NYISO methodology. \n \nDemand Reduction Bus: The electrical location where the load reduction will take place and where \nLocational Based Marginal Price (LBMP) is measured.  Each customer will be assigned to a specific \nDemand Reduction Bus for the entire term of service. \n Received: 11/21/2013 \n Status: EFFECTIVE \n Effective Date: 01/01/2014"},{"page":68,"startToken":13082,"endToken":13442,"text":"Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York\n..DID:        21610\n..TXT: PSC NO: 15   ELECTRICITY                        LEAF: 267.6\nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION         REVISION: 3\nINITIAL EFFECTIVE DATE: 05/12/03         SUPERSEDING REVISION: 2\nSTAMPS:\nRECEIVED: 02/10/03 STATUS: Pending   EFFECTIVE: 05/12/03\nSERVICE CLASSIFICATION NO. 13 (Cont'd)\nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)\nSPECIAL PROVISIONS (Cont'd)\n13.11 Day-Ahead Demand Response Program (DADRP) (Cont'd)\nDispatch Day: The day when the customer is required to reduce load following\nacceptance by the NYISO of the Company's bid into the Day-Ahead Market.\nNotification Day: The day when the Company notifies the customer that it must\nreduce load on the Dispatch Day.\nCriteria for Bids\nBids shall be submitted in 100 KW increments for the time period and the price\nlevel specified by the Company, subject to the zonal floor bid price\nrequirement of the NYISO's DADRP.\nThe maximum hourly bid reduction that may be bid by a customer for any hour\nshall not be greater than the CBL for that hour.\nBidding Procedure\nOn any Bidding Day prior to 1 P.M., the customer may provide the Company a Bid\nin 100 KW increments per account.  The Company will aggregate bids and submit\nthem in 1 MW increments to the NYISO in accordance with NYISO requirements. \nThe aggregation of Bids into 1 MW increments may require adjustments to the\nbid price level, which may reduce the competitiveness of the Company's bid to\nthe NYISO.  If aggregated Bids on any Demand Reduction Bus are less than 1 MW,\nthe Company will reject all Bids at that Demand Reduction Bus.  Prior to 5\nA.M. on the Notification Day, the Company will submit its bids to the NYISO. \nBetween 11 A.M. and 3 P.M., on the Notification Day, the Company will notify\nthe customer which Bids are accepted.  Any Bid not accepted is deemed\nrejected.\nRates and Charges\nThe customer will be subject to all other rates and charges in this Service\nClassification.\n Received: 02/10/2003 \n Status: EFFECTIVE \n Effective Date: 05/16/2003 \nEffective date postponed to 05/16/2003. See Supplement No. 22."},{"page":69,"startToken":13442,"endToken":13739,"text":"Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York\nPSC NO: 15 ELECTRICITY\nLEAF: 267.7\nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION \nREVISION:     3\nINITIAL EFFECTIVE DATE: 03/17/05                   SUPERSEDING REVISION:     2\n \nSERVICE CLASSIFICATION NO. 13 (Cont’d)\nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont’d)\nSPECIAL PROVISIONS (Cont'd)\n13.11 Day-Ahead Demand Response Program (DADRP) (Cont’d)\nPayments and Penalties for Load Reductions by Curtailment: Payments will only be\nmade for bids submitted by the Company and scheduled by the NYISO.  For each hour\nin which the customer reduced load under this Special Provision, the Company will\npay the customer an amount equal to the customer’s bid in kW for such hour times\n90 percent of the dollars received by the Company from the NYISO for scheduled\nDay-Ahead Load Reductions, excluding any Demand Reduction Incentive payments for\nsuch hour, times the ratio of the aggregated Bids at the customer’s Demand\nReduction Bus for such hour, rounded to the nearest lower whole MW to the\naggregated Bids at the Customer’s Demand Reduction Bus for such hour.  The sum\nof the amounts so calculated in any billing cycle for the hours in which the\ncustomer’s Bids were accepted will be the amount paid to the customer for such\nbilling cycle.  The payment to the customer for each hour will in no event be\nless than 90 percent of the product of the customer’s Bid and the bid price\nlevel.\nPayment, net of any penalties, will be made by bill credit on the  customer’s\nbill following the Company’s receipt of payment from the NYISO.\nSpecial Provision Term\nService under this Special Provision will be provided in accordance with the New\nYork Independent System Operator’s Day-Ahead Demand Response Program.\n Received: 12/17/2004 \n Status: EFFECTIVE \n Effective Date: 03/17/2005"},{"page":70,"startToken":13739,"endToken":13864,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:         268 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION \nREVISION:          6 \nINITIAL EFFECTIVE DATE: 10/01/2025 \n \nSUPERSEDING REVISION:          5 \nIssued in Compliance with Order in Case 22-E-0236 dated October 17, 2024 \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \n \nSERVICE CLASSIFICATION NO. 13    (Cont’d) \n \nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE  (Cont’d) \n \nSPECIAL PROVISIONS   (Cont’d) \n \n13.12  \nEV Phase-In Rates \n \nCustomers taking service under this service classification may be eligible to participate in EV-PIR as described in \nGeneral Information Section 52, for their energy and demand delivery charges. Customers enrolled in EV-PIR are \nsubject to all other rates and charges of their parent service classification including any minimum billing demands. \n Received: 07/03/2025 \n Status: EFFECTIVE \n Effective Date: 10/01/2025"},{"page":71,"startToken":13864,"endToken":13943,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:         269 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION \nREVISION:          5 \nINITIAL EFFECTIVE DATE: 04/01/12 \n \nSUPERSEDING REVISION:          3 \nIssued in Compliance with Orders Establishing Filing Requirements Dated November 21, 2011 and March 16, 2012 \nIssued by: Michael L. Mosher, Vice President, Poughkeepsie, New York \n \n \n \nSERVICE CLASSIFICATION NO. 13    (Cont’d) \n \nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE  (Cont’d) \n \nSPECIAL PROVISIONS   (Cont’d) \n \nReserved for future use. \n \n Received: 03/28/2012 \n Status: EFFECTIVE \n Effective Date: 04/01/2012"},{"page":72,"startToken":13943,"endToken":14042,"text":"Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York\n..DID:        14706\n..TXT: PSC NO: 15   ELECTRICITY                        LEAF: 270\nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION         REVISION: 2\nINITIAL EFFECTIVE DATE: 02/01/01         SUPERSEDING REVISION: 1\nSTAMPS: Issued in Compliance with Order in C.96-E-0909 dated January 26, 2001\nRECEIVED: 01/31/01 STATUS: Effective EFFECTIVE: 02/01/01\nSERVICE CLASSIFICATION NO. 13 (Cont'd)\nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)\nReserved for future use.\n Received: 01/31/2001 \n Status: EFFECTIVE \n Effective Date: 02/01/2001 \nIssued in Compliance with Order in C.96-E-0909 dated January 26, 2001"},{"page":73,"startToken":14042,"endToken":14141,"text":"Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York\n..DID:        14707\n..TXT: PSC NO: 15   ELECTRICITY                        LEAF: 271\nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION         REVISION: 2\nINITIAL EFFECTIVE DATE: 02/01/01         SUPERSEDING REVISION: 1\nSTAMPS: Issued in Compliance with Order in C.96-E-0909 dated January 26, 2001\nRECEIVED: 01/31/01 STATUS: Effective EFFECTIVE: 02/01/01\nSERVICE CLASSIFICATION NO. 13 (Cont'd)\nLARGE POWER SUBSTATION AND TRANSMISSION SERVICE (Cont'd)\nReserved for future use.\n Received: 01/31/2001 \n Status: EFFECTIVE \n Effective Date: 02/01/2001 \nIssued in Compliance with Order in C.96-E-0909 dated January 26, 2001"},{"page":74,"startToken":14141,"endToken":14149,"text":"Central Hudson \nService Classification No. 14: Standby Service"},{"page":75,"startToken":14149,"endToken":14589,"text":"PSC NO: 15 ELECTRICITY \n                           LEAF: 272  \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                                        REVISION:     6      \nINITIAL EFFECTIVE DATE: 01/01/2024                                                                SUPERSEDING REVISION:     5  \nIssued in Compliance with Order in Case 15-E-0751 dated October 13, 2023 \n \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \n \nSERVICE CLASSIFICATION NO. 14  \n \n \nSTANDBY SERVICE  \n \n \nAPPLICABLE TO USE OF SERVICE FOR: \n \nAll purposes, where a customer operates on-site generation (OSG) with a total nameplate rating greater than, or expected \nto be greater than, fifteen percent (15%) of its maximum potential demand served by all sources, and determined in the \nsame manner as the Contract Demand set forth below, and where the customer elects to have the Company supply and/or \ndeliver energy to the customer by means of the Company's delivery facilities.  For purposes of this Service \nClassification, OSG shall be defined as a generation facility which does not supply energy to the customer by means of \nthe Company’s delivery facilities and “delivery facilities” shall mean any facilities or equipment that are part of the \nCompany’s electrical system regardless of the voltage level or functional classification. \n \nCustomers taking service under a metered service classification and not otherwise required to take Standby Service may \n“opt-in” to the rates offered under this Service Classification, as described in Special Provision 14.12. \n \nWith the exceptions listed below, OSG customers who decline service under this tariff are required to electrically isolate \nthemselves from the Company’s electric system and the Company will not be required to maintain or supply service to \nsuch customers.  A customer shall be considered electrically isolated if (a) the electrical points of contact where \ninterconnection may occur are separated and at least one-hundred (100) feet from any other interconnected electrical \nservice of such customer, or (b) the disconnected isolated service is not within the same building or structure as any other \ninterconnected electrical services of the customer and not housed within a common enclosure with other interconnected \nbreakers and/or fuses of the customer. \n \nSTANDBY SERVICE IS NOT APPLICABLE TO: \n \nStandby service shall not be applicable in the following instances, and shall be so designated in the customer’s \nApplication for Electric Standby Service, as applicable: \n \nNon-Material Operation of On-Site Generation \n \nCentral Hudson shall have the right to exclude a customer from this Service Classification upon any appropriate grounds, \nincluding, without limitation, a demonstration that the customer (a) has installed OSG with a total nameplate rating \ngreater than fifteen percent (15%) of its load, but (b) has not operated or is not operating that OSG in a material manner \nin order to serve the customer's load.  \n \n \n \n \n \n \n \n \n \n Received: 12/15/2023 \n Status: EFFECTIVE \n Effective Date: 01/01/2024"},{"page":76,"startToken":14589,"endToken":15007,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:       272.1 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION  \n     REVISION:           9  \nINITIAL EFFECTIVE DATE: 01/19/24 \n \nSUPERSEDING REVISION:           8 \nIssued in compliance with Order in C.22-E-0236 dated November 20, 2023 \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \nSTANDBY SERVICE IS NOT APPLICABLE TO: (Cont'd) \n \nTechnologies Eligible Under Public Service Law (“PSL”) §66-j and §66-l: \n \nWith the exception of customers taking service under Special Provision 14.12, Standby service rates shall not apply \nto customers owning or operating electric generating equipment as defined in PSL §66-j and §66-l, up to the system \nsize limits contained in General Information Section 48.B, when such customers are taking service under the \nprovisions of General Information Section 37, 38, 46 or 48 and comply with the Standardized Interconnection \nRequirements set forth in the SIR-Addendum of this Rate Schedule. \n \nHybrid Facilities \n \nStandby service shall not apply to customers who pair energy storage systems with eligible electric generating \nequipment that receive compensation under General Information Section 48.B for Hybrid Energy Storage.  \n \nEnergy Storage \n \nStandby service shall not apply to customers with energy storage systems with a maximum capability up to and \nincluding 1MW. Standby service shall also not apply to customers with energy storage systems with inverter \ncapability greater than 1 MW and less than or equal to the sum of nameplate EV charging capability. \n \nEmergency Generators \n \nStandby service shall not apply to customers whose only generating units are emergency generators.  For the \npurposes of this Service Classification, a generating unit must be designated in the customer's Application for \nElectric Standby Service with the Company as an emergency generator and must meet each of the following \nrequirements to be considered an emergency generator:  \n \n  1)  \nthe emergency generator is not capable of being operated in parallel with the Company’s delivery system, \nexcept for closed-transition transfer switching where the term “closed-transition transfer” is characterized \nas a momentary make-before-break switching sequence, and \n \n  2) \nthe emergency generator is used exclusively for purposes of supplying electrical power to the customer \nwhen electrical power is not available from the Company, and \n \n  3) \nno load is served by the emergency generator while electric service is available from the Company to the \npremises, except for regularly scheduled tests when the generator is required to operate under load or for \nNYISO Emergency Response Programs or for NYISO unforced capacity requirements for special case \nresources, and \n \n  \n \n Received: 01/18/2024 \n Status: EFFECTIVE \n Effective Date: 01/19/2024"},{"page":77,"startToken":15007,"endToken":15352,"text":"PSC NO: 15 ELECTRICITY \n \n \n \n \n \n \n \nLEAF: 272.2  \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                          REVISION:        3 \nINITIAL EFFECTIVE DATE: 01/01/2024                                                  SUPERSEDING REVISION:        2 \nIssued in Compliance with Order in Case 15-E-0751 dated October 13, 2023 \n \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \n \n  \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \nSTANDBY SERVICE IS NOT APPLICABLE TO: (Cont'd) \n \nEmergency Generators (Cont’d) \n \n  4) \nthe customer maintains an operating log for each emergency generator  indicating the date, time, hours and \npurpose of each operation of each such facility.  The log shall be made available to the Company upon request. \n Failure to do so shall permit the Company to bill the customer under the rates of this Service Classification for \nthe amount of electric standby service which the Company can reasonably estimate was supplied to the \ncustomer during times when electric service was available from the Company. \n \nSeparately Metered Accounts Not Served by On-Site Generation \n \nAll separately metered service accounts within the premises whereby electricity consumption is not otherwise served \ndirectly through facilities owned by the customer shall be provided at the standard tariff rates for the Parent Service \nClassification.  Parent Service Classification shall mean the Service Classification that the customer would otherwise \nqualify for based on the customer’s usage characteristics. \n \nNYPA Programs and Individually Negotiated Contracts \n \nStandby service rates shall not apply to that portion of a customer's delivery service associated with the provision of \napplicable NYPA programs or that portion of delivery service served under the terms and conditions of an individually \nnegotiated contract. \n \nAPPLICATION FOR SERVICE \n \nThe Customer must apply for service by providing the Company with an executed Application For Electric Standby \nService, as set forth below, and an executed Application for Interconnection and an executed Interconnection Agreement, \nif applicable, both of which are available from Company representatives.   \n \nCHARACTER OF SERVICE \n \nContinuous, 60 cycle single or three phase alternating current delivered at one secondary or primary distribution voltage \nor transmission voltage, phase and voltage depending on availability and the customer’s requirements. \n Received: 12/15/2023 \n Status: EFFECTIVE \n Effective Date: 01/01/2024"},{"page":78,"startToken":15352,"endToken":15651,"text":"PSC NO: 15 ELECTRICITY   \n \nLEAF:  \n272.3  \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION  \n           REVISION:          16  \nINITIAL EFFECTIVE DATE: 09/01/2025   \n   \n \n          SUPERSEDING REVISION:          15  \nIssued in Compliance with Order in C. 24-E-0461 dated August 14, 2025 \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \nSTANDBY SERVICE (Cont’d) \n \n \nMONTHLY RATES EFFECTIVE SEPTEMBER 1, 2025 \n  \nCustomer Charge \nParent Service Classification shall mean the Service Classification that the customer would otherwise qualify for \nbased on the customer’s usage characteristics. \n \n \n \n \n \n \n \n \nParent Service Classification \n \nService Classification No.1 \n$             22.50 \nService Classification No.2 -Non Demand \n$             33.50 \nService Classification No.2 -Secondary Demand \n$           160.00 \nService Classification No.2 -Primary Demand \n$           570.00 \nService Classification No.3 \n$        2,750.00 \nService Classification No.6 \n$             25.50 \nService Classification No.13 -Substation \n$        9,700.00 \nService Classification No.13 -Transmission \n$      15,500.00 \nDEMAND CHARGES \n \nContract Demand \n \n \nPer kW \nParent Service Classification \nContract Demand \nSC No.1  \n$               4.93 \nSC No.2 -Non Demand \n$               8.43 \nSC No.2 -Secondary Demand \n$               1.44   \nSC No.2 -Primary Demand \n$               3.37     \nSC No.3  \n \n$               4.63 \nSC No.6 \n$               2.83   \nSC No.13 -Substation \n \n$               3.67   \nSC No.13 -Transmission  \n$               2.65   \n \n \nDaily-As-Used Demand \n \n \n \nOn Peak \nSuper Peak \nParent Service Classification (SC) \nPer kW \nPer kW \nSC No.1  \n$0.55433 \n$0.21469 \nSC No.2 -Non Demand \n$0.50446 \n$0.22640  \nSC No.2 -Secondary Demand \n$0.71147 \n$0.24069  \nSC No.2 -Primary Demand \n$0.44708 \n$0.14120 \nSC No.3  \n$0.59914 \n$0.18439 \nSC No.6 \n$0.39954 \n$0.15375 \nSC No.13 -Substation \n$0.41450 \n$0.13160 \nSC No.13 -Transmission  \n$0.23858 \n$0.07945 \n \nReactive Demand Charge per Rkva  \n        \n \n$0.83 \n \n Received: 08/27/2025 \n Status: EFFECTIVE \n Effective Date: 09/01/2025"},{"page":79,"startToken":15651,"endToken":15951,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:       272.3.1 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                             REVISION:             10   \nINITIAL EFFECTIVE DATE: 09/01/2025                                                     SUPERSEDING REVISION:               9       \nIssued in Compliance with Order in C. 24-E-0461 dated August 14, 2025 \n \n          \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \nSTANDBY SERVICE (Cont’d) \n \nMONTHLY RATES EFFECTIVE JULY 1, 2026 \n \nCustomer Charge \nParent Service Classification shall mean the Service Classification that the customer would otherwise qualify for \nbased on the customer’s usage characteristics. \n \n \n \n \n \n \nParent Service Classification \n \nService Classification No.1 \n$                24.00 \nService Classification No.2 -Non Demand \n$                35.00 \nService Classification No.2 -Secondary Demand \n$              180.00 \nService Classification No.2 -Primary Demand \n$              610.00 \nService Classification No.3 \n$           2,950.00 \nService Classification No.6 \n$                27.00 \nService Classification No.13 -Substation \n$         11,050.00 \nService Classification No.13 -Transmission \n$         18,000.00 \nDEMAND CHARGES \n \nContract Demand \n \n \nPer kW \nParent Service Classification \nContract Demand \nSC No.1  \n$                 5.32 \nSC No.2 -Non Demand \n$                 9.27 \nSC No.2 -Secondary Demand \n$                 1.36 \nSC No.2 -Primary Demand \n$                 3.53 \nSC No.3  \n \n$                 4.87 \nSC No.6 \n$                 2.97 \nSC No.13 -Substation \n \n$                 3.87 \nSC No.13 -Transmission  \n$                 2.73 \n \n \nDaily-As-Used Demand \n \n \n \nOn Peak \nSuper Peak \nParent Service Classification (SC) \nPer kW \nPer kW \nSC No.1  \n$0.59722 \n$0.23249 \nSC No.2 -Non Demand \n$0.54221 \n$0.24334 \nSC No.2 -Secondary Demand \n$0.75183 \n$0.25434 \nSC No.2 -Primary Demand \n$0.47072 \n$0.14866 \nSC No.3  \n$0.63436 \n$0.19523 \nSC No.6 \n$0.42077 \n$0.16192 \nSC No.13 -Substation \n$0.40914 \n$0.12990 \nSC No.13 -Transmission  \n$0.25615 \n$0.08530 \n \nReactive Demand Charge per Rkva  \n        \n \n$0.83 \n \n Received: 08/27/2025 \n Status: EFFECTIVE \n Effective Date: 09/01/2025"},{"page":80,"startToken":15951,"endToken":16255,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:       272.3.2 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                            REVISION:    \n15                \nINITIAL EFFECTIVE DATE: 09/01/2025                                                    SUPERSEDING REVISION: \n13  \nIssued in Compliance with Order in C. 24-E-0461 dated August 14, 2025 \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \nMONTHLY RATES EFFECTIVE JULY 1, 2027 \n  \nCustomer Charge \nParent Service Classification shall mean the Service Classification that the customer would otherwise qualify for \nbased on the customer’s usage characteristics. \n \nEffective \n \nParent Service Classification \nJuly 1, 2027 \nService Classification No.1 \n$              26.00 \nService Classification No.2 -Non Demand \n$              37.00 \nService Classification No.2 -Secondary Demand \n$            200.00 \nService Classification No.2 -Primary Demand \n$            650.00 \nService Classification No.3 \n$         3,200.00 \nService Classification No.6 \n$              29.00 \nService Classification No.13 -Substation \n$       12,500.00 \nService Classification No.13 -Transmission \n$       21,000.00 \n \n \nDEMAND CHARGES \n \n \n \nContract Demand \n \n \nPer kW \nParent Service Classification \nContract Demand \nSC No.1  \n$                5.64 \nSC No.2 -Non Demand \n$                9.86 \nSC No.2 -Secondary Demand \n$                1.22 \nSC No.2 -Primary Demand \n$                3.66 \nSC No.3  \n \n$                4.96 \nSC No.6 \n$                3.03 \nSC No.13 -Substation \n \n$                3.54 \nISC No.13 -Transmission  \n$                2.70 \n \n \nDaily-As-Used Demand \n \n \n \nOn Peak \nSuper Peak \nParent Service Classification (SC) \nPer kW \nPer kW \nSC No.1  \n$0.63781 \n$0.24978 \nSC No.2 -Non Demand \n$0.57480 \n$0.25797 \nSC No.2 -Secondary Demand \n$0.78041 \n$0.26401 \nSC No.2 -Primary Demand \n$0.49461 \n$0.15621 \nSC No.3  \n$0.65732 \n$0.20229 \nSC No.6 \n$0.43528 \n$0.16751 \nSC No.13 -Substation \n$0.42331 \n$0.13440 \nSC No.13 -Transmission  \n$0.26780 \n$0.08918 \n \nReactive Demand Charge per Rkva  \n       $0.83 \n \n \n \n Received: 08/27/2025 \n Status: EFFECTIVE \n Effective Date: 09/01/2025"},{"page":81,"startToken":16255,"endToken":16859,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:         272.4 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                             REVISION:               4          \nINITIAL EFFECTIVE DATE: 01/01/2024                                                      SUPERSEDING REVISION:              3    \nIssued in Compliance with Order in Case 15-E-0751 dated October 13, 2023          \n \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \nCONTRACT DEMAND \n \nA customer opting into these rates  under Special Provision 14.12 shall have their contract demand initially set at the \nmaximum metered demand over the previous twelve (12) months measured based on the highest rolling 60 minute \nintegrated demand established during the monthly period for Service Classification No 1, 2 non-demand, and 6 and \nmeasured based on the highest 15 minute integrated demand for all other customers. For customers without twelve \nmonths of metered demand history, the contract demand shall be initially set at the maximum metered demand over \nthe entire billing history, measured based on the highest 60-minute or 15-minute integrated demand, as applicable, \nand may be adjusted upward each month until a maximum over the previous twelve months is established. \n \nNon-mass market customers that operate on-site generation will have the option of: \n \n1) \nestablishing their own Contract Demand, and providing this nomination in writing to the Company \nat least ten (10) days prior to the first day of the customer's next billing cycle, for existing \ncustomers, or at least ten (10) days prior to commencing service, for new customers; or \n \n2) \naccepting a Contract Demand established by Central Hudson in accordance with the following: \n \n(a) \nIn the case of an existing customer, the Contract Demand shall initially be set at the \nmaximum metered demand over the previous twelve (12) months; \n \n(b) \nIn the case of a new customer, the Contract Demand shall be determined by assessing the \nnameplate rating of the equipment to be served, and projecting the coincidence and \ndiversity of the new customer's load.  The Contract Demand so determined shall be \nprovided to the customer, in writing, at least ten (10) days prior to the customer \ncommencing service. \n \n \nThe Contract Demand may be increased by the customer at any time with written notice to the Company.  Such \nnotice must be provided at least ten (10) days prior to the first day of the customer's next billing cycle. \n \nFor customers whose parent service classification is Service Classification No. 1, 2 non-demand or 6, the monthly \ndemand will be the highest rolling 60-minute integrated kilowatt demand established during the monthly period for \nwhich a bill is rendered. For all other customers, the monthly demand will be the highest 15-minute integrated \nkilowatt demand established during the monthly period for which a bill is rendered.  For all instances where the \ncustomer's actual metered monthly demand exceeds the customer's Contract Demand, the customer's Contract \nDemand will be increased to the new peak.  If, in any given billing month, there is a failure in meter data acquisition \nthat results in the failure to measure the actual monthly peak demand, the Contract Demand shall be used for billing \nand recording purposes.  \n \nIf the customer demonstrates that electricity-producing equipment has been removed or disabled in place or \nappropriate load limiting devices are installed and operated, the Contract Demand may be reduced upon written \nrequest from the customer and written acknowledgment of the request from the Company, except that if the \nCompany does not accept or reject the request within ten (10) days of its receipt, the request shall be deemed \ngranted.  Such notice must be provided at least ten (10) days prior to the first day of the customer's next billing \ncycle.  \n Received: 12/15/2023 \n Status: EFFECTIVE \n Effective Date: 01/01/2024"},{"page":82,"startToken":16859,"endToken":17208,"text":"Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York\nPSC NO: 15 ELECTRICITY                                        \nLEAF:  272.5\nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION            REVISION:      2\nINITIAL EFFECTIVE DATE: 07/01/04                  SUPERSEDING REVISION:      1\nIssued in Compliance with Order in C. 02-E-1108 Dated December 4, 2003\nSERVICE CLASSIFICATION NO. 14 (Cont’d)\nSTANDBY SERVICE (Cont’d)\nCONTRACT DEMAND (Cont’d)\nThe Contract Demand may be reduced no more than one time in a 365-day period\nand/or 365 days from any increase in Contract Demand.  Seasonal and other\ntemporary fluctuations in load of the customer's existing facilities such as\nheating and air conditioning, and temporary reductions in manufacturing, shall\nnot qualify for reductions in Contract Demand.\nCONTRACT DEMAND ADJUSTMENT CHARGES\nFor a customer that elects to establish its own Contract Demand, if, in any\nbilling month, the customer’s actual metered demand exceeds the customer’s\nContract Demand:\n  \n(a) \nby less than ten percent (10%) then an adjustment charge equal to\nthe product of twelve (12) times the contract demand rate times the\ndemand in excess of the Contract Demand shall apply to that monthly\nbill, or \n(b)\nby ten percent (10%) but less than twenty percent (20%) then an\nadjustment charge equal to the product of eighteen (18) times the\ncontract demand rate times the demand in excess of the Contract\nDemand shall apply to that monthly bill, or\n(c)\nby twenty percent (20%) or more then an adjustment charge equal to\nthe product of twenty-four (24) times the contract demand rate times\nthe demand in excess of the Contract Demand shall apply to that\nmonthly bill.\nDuring the two (2) year period commencing July 1, 2004, one exceedence in the\nfirst year of OSG operation of less than ten percent (10%) in magnitude will be\nexcused from any adjustment charges for new customers installing OSG and existing\ncustomers with OSG installed after September 19, 2003.  For purposes of this\nparagraph, an OSG shall be deemed to have commenced operation when the OSG first\ndelivers electricity to serve the customer's load.\n Received: 03/31/2004 \n Status: EFFECTIVE \n Effective Date: 07/01/2004"},{"page":83,"startToken":17208,"endToken":17606,"text":"PSC NO: 15 ELECTRICITY \nLEAF:       272.6 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION  \n REVISION:   \n   12  \nINITIAL EFFECTIVE DATE: 01/01/2024       \n  SUPERSEDING REVISION:  \n 11 \nIssued in Compliance with Order in Case 15-E-0751 dated October 13, 2023   \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \nSTANDBY SERVICE (Cont’d) \nDAILY AS USED DEMAND \nThe Daily-As-Used demand for Customers taking service under Service Classification No.1, 2 non-demand, and 6 \nshall be the highest rolling 60-minute integrated kilowatt demand and for all other Service Classifications shall be \nthe highest 15-minute integrated kilowatt demand, established during: \n1.\nOn-peak peak hours of 7 a.m. to 11 p.m. of every weekday;\n2.\nSuper-peak hours of 2 p.m. to 7 p.m. of every weekday during the months of June-September;\nAll remaining hours are defined as off-peak hours. \nIf, in any given billing month, there is a failure in the metered usage data acquisition that results in the failure to \nrecord daily demand data, Central Hudson reserves the right to estimate reasonable values for the missing data for \nbilling and recording purposes. \nReactive Demand \nThe Reactive Demand will be the highest 15-minute integrated kilovoltamperes of lagging reactive demand \nestablished during the month less one-third of the highest 15-minute integrated kilowatt demand established during \nthat month. \nFor customers operating induction generators, reactive demand will be the highest 15-minute integrated \nkilovoltamperes of lagging reactive demand established during the month less one-third of the highest 15-minute \nintegrated kilowatt generated during that month. In instances where there is no generation or a customer does not \nfully offset their load in a given month, reactive demand will be calculated in the manner consistent with the parent \nservice classification. \nWith the exception of customers taking service under Special Provision 14.12, Reactive Demand Charges will be  \napplied to customers with induction generators having a total nameplate rating greater than or equal to 500 kW and  \ncustomers whose demands in any two of the previous twelve months are 500 kW or larger.  \nELECTRIC BILL CREDIT \nThe Electric Bill Credit, as described in General Information Section 36.B, shall apply to all customers served under \nthis Service Classification. \nSYSTEM BENEFITS CHARGE \nThe System Benefits Charge, as described in General Information Section 36.A, shall apply to all electricity \ndelivered under this Service Classification. \n Received: 12/15/2023 \n Status: EFFECTIVE \n Effective Date: 01/01/2024"},{"page":84,"startToken":17606,"endToken":17740,"text":"PSC NO: 15 ELECTRICITY \n \n LEAF:    272.6.1   \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                               REVISION:              9 \nINITIAL EFFECTIVE DATE: 08/01/2024                                                       SUPERSEDING REVISION: \n8 \nIssued in Compliance with Order in C. 23-E-0418 dated July 18, 2024 \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \nSTANDBY SERVICE (Cont’d) \n \nMISCELLANEOUS CHARGES \n \nThe provisions of the Company’s Miscellaneous Charges, as described in General Information Section 29, shall apply \nto all electricity delivered under this Service Classification. \n \nREVENUE DECOUPLING MECHANISM \n \nThe Revenue Decoupling Mechanism, as described in General Information Section 36.G, shall apply to all \nelectricity delivered to Service Classification No. 14 customers whose parent service classification would be either \nService Classification No. 1, 2, 3, 6, or 13. \n \n \n Received: 07/30/2024 \n Status: EFFECTIVE \n Effective Date: 08/01/2024"},{"page":85,"startToken":17740,"endToken":18295,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:      272.7 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                                REVISION:          11 \nINITIAL EFFECTIVE DATE: 02/01/2025                                                        SUPERSEDING REVISION:          10 \n \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \nSTANDBY SERVICE (Cont’d) \n \nHOURLY PRICING PROVISION \n \nAll customers electing to purchase their energy requirements from the Company will be billed for these \nrequirements based on the charges set on an hourly basis according to the market price of electricity described \nbelow.  \n \nThe market price of electricity will be the hourly Day-Ahead Locational Based Market Price (DAM) as set forth by \nthe New York State Independent System Operator (NYISO) for Central Hudson, Hudson Valley, Zone G (Zone G). \nThe source of the hourly prices will be the NYISO website for the DAM. \n \nOTHER CHARGES \n \nCustomers taking service under this Service Classification will also be subject to charges for energy balancing as \nwell as non-energy components of electric power supply, such as capacity, ancillary services and allowances for \nworking capital costs and bad debts. \n \nCapacity charges will be recovered through a separate charge, HPP UCAP. Each customer’s capacity charge will be \ncalculated as the product of the customer’s demand during the previous summer’s ICAP market peak hour, as \nadjusted pursuant to the ICAP market peak load forecast for the corresponding capability period and NYISO UCAP \nrequirements, and the monthly NYISO Spot Auction price for the capacity zone(s) from which the capacity is \nacquired pursuant to the requirements of the NYISO for the prior calendar month. The HPP UCAP will be stated in \nwhole $0.01 amounts per kilowatt and will be filed with the Public Service Commission on the Statement of Market \nPrice Charge and Market Price Adjustment. \n \nFor customers without metered demand during the previous summer’s ICAP market peak hour, such demand shall \nbe determined as follows: \n1) \nCustomers whose parent service classification is SC No. 1, 2 or 6 will utilize the demand of the \ncustomer’s respective load profile, adjusted for the customer’s specific usage factor; or \n(2) \nCustomers whose parent service classification is SC No. 3 or 13, the demand will be estimated by \nthe Company on the basis of available data; and \n(3) \nFor customers in (1) or (2) above with OSG, the estimated demand will be reduced by an estimate \nof the output of the generator based on: \n(a)  the National Renewable Laboratory Photovoltaic Profiles (“NREL Profiles”) included in       \nAppendix H of the Commission’s September 14, 2017 Order in Case 15-E-0751for solar; or  \n(b) rated capacity and anticipated usage of equipment for other technologies; and \n(4) \nFor customers with estimated demand during the previous summer’s ICAP market peak hour, \nactual metered demand during the previous summer’s ICAP market peak hour will be utilized \nbeginning May 1 of the year following the ICAP market peak hour for which the customer had \nmetered demand. \n \nThe HPP Charge will recover charges for energy balancing, ancillary services, allowances for working capital and \nbad debts. \n \nINCREASE IN RATES AND CHARGES \n \nAll rates and charges billed under this Service Classification, including the Minimum Charge, and other charges \npursuant to the General Information Section (as applicable), shall be increased pursuant to General Information \nSection 30 to reflect the tax rates applicable within the municipality where the customer takes service. \n \n \n \n Received: 10/02/2024 \n Status: EFFECTIVE \n Effective Date: 02/01/2025"},{"page":86,"startToken":18295,"endToken":18486,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:      272.7.1 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                             REVISION: \n0 \n              \nINITIAL EFFECTIVE DATE: 01/01/24                                                         SUPERSEDING REVISION: \n \nIssued in Compliance with Order in Case 15-E-0751 dated October 13, 2023            \n \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \nSTANDBY SERVICE (Cont’d) \n \n \n \n \nMINIMUM CHARGE \n \nThe Customer Charge, incremental metering charge, if applicable, and the Contract Demand Charge, and any non-\nby passable charges pursuant to the General Information Section of this rate schedule. In addition, effective October \n1, 2011, customers whose Parent Service Classification is S.C. No. 2 with demand exceeding 500 kW in any two of \nthe previous twelve months (as measured semi-annually for the twelve months ending June and December) and \neffective October 1, 2012 all customers with demand exceeding 300 kW in any two of the previous twelve months \n(as measured semi-annually for the twelve months ending June and December, but initially for the twelve months \nended June 30, 2010) will be assessed an incremental monthly charge as set forth in Special Provision 2.11. \n \n \n Received: 12/15/2023 \n Status: EFFECTIVE \n Effective Date: 01/01/2024"},{"page":87,"startToken":18486,"endToken":18926,"text":"PSC NO: 15 ELECTRICITY \n                              \nLEAF: 272.8  \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                      REVISION:     4 \nINITIAL EFFECTIVE DATE: 01/01/2024                                     SUPERSEDING REVISION:     3 \nIssued in Compliance with Order in Case 15-E-0751 dated October 13, 2023 \n \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \n \nTERMS OF PAYMENT \n \nBills are due when personally served or three days after mailing.  Bills shall be subject to a late payment charge in \naccordance with General Information Section 16, if payment is not made by the date specified on the bill which date \nshall be not less than twenty (20) days from the due date. \n \nINTERCONNECTION REQUIREMENTS AND FEES \n \nCustomers with on-site generation must have an executed Application for Interconnection and an executed \nInterconnection Agreement with the Company and must meet all Company interconnection requirements.  If the \ncustomer does not have an effective interconnection agreement with the Company, the Company shall have the right \nto back-bill the customer as stated in the Special Provisions section of this Service Classification. \n \nThe customer shall be required to pay for the costs that the Company incurs related to the generator that supplies the \ncustomer, subject to the Standard Interconnection Requirements, as set forth in the SIR-Addendum of this rate \nschedule, the Company's interconnection requirements for facilities sized greater than 5 MW, and other \ninterconnection rules and regulations.  These costs include, but are not limited to system modifications, cost of capital, \ntransformers, metering, administration, engineering review, system studies, application fees and all verification tests. \n \nMETERING \n \nInterval metering and remote meter reading capability are required of all customers taking service under the rates of \nthis Service Classification including customers taking service under Special Provision 14.12. All customers shall be \nresponsible for all meter and installation costs and all costs associated with providing telecommunications to the meter \nto enable remote meter reading capability. \n \nTERM \n \nA minimum of one year from commencement of service under this Service Classification and for such additional time \nas the customer continues to qualify for standby service.  The Company may remove a customer not meeting the \ncriteria for mandatory or elective standby service at any time after the minimum term.  A customer cannot resume \nservice within one year at the same location under this Service Classification if service has been taken during the \nintervening period under any other Service Classification. \n \nA customer taking service under Special Provision 14.12 may discontinue service under this Service Classification at \nany time, but will not be able to opt back into Standby Service for a minimum of one year. \n Received: 12/15/2023 \n Status: EFFECTIVE \n Effective Date: 01/01/2024"},{"page":88,"startToken":18926,"endToken":19248,"text":"Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York\nPSC NO: 15 ELECTRICITY\n                             LEAF: 272.9 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION            REVISION:     0 \nINITIAL EFFECTIVE DATE: 07/01/04                  SUPERSEDING REVISION:    \nIssued in Compliance with Order in C. 02-E-1108 Dated December 4, 2003\nSERVICE CLASSIFICATION NO. 14 (Cont’d)\nSTANDBY SERVICE (Cont’d)\nSPECIAL PROVISIONS\nThe numbering of the paragraphs hereunder begins with the above service\nclassification number.\n14.1 Backbilling\nIf the customer has connected generation to its electric system without\nnotification to the Company, the Company may disconnect the customer and\nshall backbill the customer for all service rendered subsequent to\ninstallation of such generation at the rates and charges set forth in this\nService Classification including applicable interest.  Backbills will be\nbased on the generator’s nameplate rating and a one-hundred percent (100%)\nusage factor.  The backbill period will be for the period from the time\nthe generator was brought on line to the time the installation became\nknown.\n14.2 Maintenance Schedules\nA customer supplied by a generator with a nameplate rating of 1000\nkilowatts or greater must provide the Company with an annual schedule of\nplanned maintenance outages.  This schedule must be provided upon taking\nservice and must be provided by October of the preceding year for each\nsubsequent year thereafter.  Schedules must include starting and ending\ntimes for all planned outages. \n14.3\nDemand Customers with Contract Demand Less Than 50 kW\nCustomers \nwho would otherwise qualify for service under Service\nClassification No. 2 demand rates with a Contract Demand less than fifty\n(50) kilowatts must elect to be served either under the standby rates of\nthis Service Classification or the applicable rates of S.C. No. 2.\nCustomers electing to be served under the standby rates of this Service\nClassification must install an approved interval meter pursuant to the\nrequirements of this Service Classification.\n Received: 03/31/2004 \n Status: EFFECTIVE \n Effective Date: 07/01/2004"},{"page":89,"startToken":19248,"endToken":19688,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:       272.10 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION  \n     REVISION:         10  \nINITIAL EFFECTIVE DATE: 01/01/2024 \n \nSUPERSEDING REVISION:           9 \nIssued in Compliance with Order in Case 15-E-0751 dated October 13, 2023 \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \nSTANDBY SERVICE (Cont’d) \n \n \nSPECIAL PROVISIONS (Cont'd) \n \n14.4 \nSmall Customer Exclusion \n \nExcluding customers taking service pursuant to Special Provision 14.12, small non-demand metered \ncustomers, defined as those customers who would otherwise qualify for service under Service \nClassification Nos. 1, 2 or 6, that qualify for service under this Service Classification shall  \ntake service under this Service Classification but be billed pursuant to the rates, terms and conditions of  \ntheir Parent Service Classification. This provision will expire after the month that 100 customers are billed \nunder this Special Provision. \n \n14.5  \nStandby Rates Billing Phase-In for Certain Technologies \n \nCustomers with OSG that enters service after July 29, 2003, and uses any of the designated technologies \nlisted below shall have the option of: (a) an exemption from the standby rates of this Service Classification \nby taking service at the standard rates of the applicable Parent Service Classification; (b) a phase-in of the \nstandby rates of this Service Classification with the customer joining the phase-in schedule as of the date \nthe OSG enters service; or, (c) service at the standby rates of this Service Classification without a phase-in. \n \nFor the purposes of this Special Provision, the designated technologies shall be as follows:  \n1) fuel cell units which utilize biofuels or hydrogen, provided that the manufacture or production of such \nfuels does not include the combustion or electrolysis of fossil fuels, or the use of fossil fuel or \nnonrenewable grid power in the conversion process; 2) on land and offshore wind; 3) solar thermal; 4) \nphotovoltaics; 5) hydroelectric; 6) tidal; 7) geothermal electric; 8) geothermal ground source heat; 9) wave \nenergy; and 10) ocean thermal. Customers with sustainably managed biomass, biogas, and fuel cell units \nwhich utilize fossil fuel resources that enters service between July 29, 2003 and May 31, 2023, inclusive, \nare included as a designated technology. \n \nEffective July 1, 2018, as approved by the Commission in its Order issued and effective June 14, 2018 in  \nCase 17-E-0459, storage batteries are included as a designated technology, in addition to combined Nitrous  \nOxides (“NOx”) emissions of 1.6lbs/MW for customers that complete a Coordinated Electric System  \nInterconnection Review (“CESIR”) on or after July 1, 2018. All CESIRs completed before July 1, 2018 are  \ngrandfathered under 4.4lbs/MWh of NOx emissions.   \n \n Received: 12/15/2023 \n Status: EFFECTIVE \n Effective Date: 01/01/2024"},{"page":90,"startToken":19688,"endToken":19971,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:       272.11 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION  \n     REVISION:           3  \nINITIAL EFFECTIVE DATE: 07/01/18 \n \nSUPERSEDING REVISION:          2 \nIssued in Compliance with Order in C. 17-E-0459 dated June 14, 2018 \n \n \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \nSTANDBY SERVICE (Cont’d) \n \nSPECIAL PROVISIONS (Cont'd) \n  \n14.5 (Cont'd) \n \nDuring the phase-in period, a customer electing the phase-in, will take service under the standby rates of \nthis Service Classification but be billed based on the otherwise applicable non-standby service rates, or \nParent Service Classification rates, plus a percentage of the difference, if greater than zero, between the \nstandby service rates and the Parent Service Classification rates, where the percentage will be determined \nfrom the table set forth below: \n \n \nPercentage \nFrom \nTo \n0% \n7/1/2004 \n6/30/2008 \n25% \n7/1/2008 \n6/30/2009 \n50% \n7/1/2009 \n6/30/2010 \n75% \n7/1/2010 \n6/30/2011 \n100% \n7/1/2011 \n6/30/2012 \n \nCompletion of the phase-in and service at the full standby rates of this Service Classification will \ncommence as of July 1, 2012. \n \nAn eligible customer may make a one-time election, upon sixty (60) days notice to the Company, to take \nservice at the standby rates or according to the phase-in schedule at any time during the phase-in period, but \nmay not return to non-standby service or switch between the phase-in and the full standby rates after \nmaking such election.  Up to the time that it makes such an election, the designated technology customer \nshall be billed at the rates of the applicable non-standby Service Classification.  \n \n \nIssued by: Anthony S. Campagiorni, Vice President, Poughkeepsie, New York \n Received: 06/29/2018 \n Status: EFFECTIVE \n Effective Date: 07/01/2018"},{"page":91,"startToken":19971,"endToken":20343,"text":"PSC NO: 15 ELECTRICITY \n \nLEAF:       272.12 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION  \n     REVISION:           4  \nINITIAL EFFECTIVE DATE: 06/01/19 \n \nSUPERSEDING REVISION:           3 \nIssued in Compliance with Order in C. 19-E-0079 dated May 16, 2019 \nIssued by: Anthony S. Campagiorni, Vice President, Poughkeepsie, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \nSTANDBY SERVICE (Cont’d) \n \nSPECIAL PROVISIONS (Cont'd) \n  \n14.6  \nStandby Rates Billing Phase-In for Certain Existing OSG Customers \n \n \nExisting OSG customers are defined for this purpose as customers operating OSG (including renewable \ngenerators and wholesale generators) as of January 31, 2003 or who had, as of that date, commenced \nconstruction of an OSG facility within Central Hudson's service territory or received a binding, written \nfinancial commitment from a lending institution for the construction and installation of an OSG within \nCentral Hudson's service territory, and that commences operation of that OSG within two (2) years of the \ncommencement of construction or the receipt of the commitment.  Existing OSG customers shall also \ninclude projects that, as of January 31, 2003, had been named by the New York State Research and \nDevelopment Authority (NYSERDA) as an OSG project grant recipient or had been named by NYSERDA \nas an OSG feasibility study grant recipient, listed as follows: State University of New York at New Paltz.  \nTo remain qualified as an existing customer, a NYSERDA grant recipient must commence operation of its \nOSG by May 31, 2021. \n \nDuring the phase-in period, an existing customer described above, will take service under the standby rates \nof this Service Classification but be billed based on the otherwise applicable non-standby service rates, or \nParent Service Classification rates, plus a percentage of the difference, if greater than zero, between the \nstandby service rates and the Parent Service Classification rates, where the percentage will be determined \nfrom the table set forth below: \n \nPercentage \nFrom \nTo \n0% \n7/1/2004 \n6/30/2008 \n25% \n7/1/2008 \n6/30/2009 \n50% \n7/1/2009 \n6/30/2010 \n75% \n7/1/2010 \n6/30/2011 \n100% \n7/1/2011 \n6/30/2012 \n \nCompletion of the phase-in and service at the full standby rates of this Service Classification will \ncommence as of July 1, 2012. \n Received: 05/31/2019 \n Status: EFFECTIVE \n Effective Date: 06/01/2019"},{"page":92,"startToken":20343,"endToken":20516,"text":"PSC NO: 15 ELECTRICITY \nLEAF: 272.13 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                                  REVISION:           3 \nINITIAL EFFECTIVE DATE: 01/01/2024                                                          SUPERSEDING REVISION:       2          \nIssued in Compliance with Order in Case 15-E-0751 dated October 13, 2023 \n \n \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \n \nSPECIAL PROVISIONS (Cont'd) \n \n14.6  \n(Cont'd) \n \nQualifying existing OSG customers may make a one-time election within ninety (90) days following July 1, \n2004 for those existing OSG customers operating OSG as of January 31, 2003, including wholesale generators \nand designated technology, as described in Special Provision 14.5, and thirty (30) days prior to the operation of \nthe OSG facility for any other existing OSG customer that is not eligible for the designated technology \nexemption, to decline the phase-in and take service at the full standby rates of this Service Classification instead \nof the phase-in rates, by providing written notice to the Company. \n \n \n14.7 \nReserved for future use. \n \n \n Received: 12/15/2023 \n Status: EFFECTIVE \n Effective Date: 01/01/2024"},{"page":93,"startToken":20516,"endToken":20590,"text":"PSC NO: 15 ELECTRICITY \nLEAF: 272.13.1 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                               REVISION:       3 \nINITIAL EFFECTIVE DATE: 01/01/2024                                                       SUPERSEDING REVISION:       2 \n         \nIssued in Compliance with Order in Case 15-E-0751 dated October 13, 2023 \n \n                        Issued by: Joseph Hally, Vice President, Poughkeepsie, New York  \n \n \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \n \nSPECIAL PROVISIONS (Cont'd) \n \n14.7 \nReserved for future use. \n \n \n \n \n \n \n Received: 12/15/2023 \n Status: EFFECTIVE \n Effective Date: 01/01/2024"},{"page":94,"startToken":20590,"endToken":20663,"text":"PSC NO: 15 ELECTRICITY \n                             LEAF: 272.14  \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                                  REVISION:          1 \nINITIAL EFFECTIVE DATE: 01/01/2024  \n \n \n          SUPERSEDING REVISION:   0       \nIssued in Compliance with Order in Case 15-E-0751 dated October 13, 2023  \n \n \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \nSPECIAL PROVISIONS (Cont'd) \n \n14.7 \nReserved for future use. \n \n Received: 12/15/2023 \n Status: EFFECTIVE \n Effective Date: 01/01/2024"},{"page":95,"startToken":20663,"endToken":21104,"text":"Issued by: Arthur R. Upright, Senior Vice President, Poughkeepsie, New York\nPSC NO: 15 ELECTRICITY\n                             LEAF: 272.15 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION           REVISION:      0 \nINITIAL EFFECTIVE DATE: 07/01/04                 SUPERSEDING REVISION:    \nIssued in Compliance with Order in C. 02-E-1108 Dated December 4, 2003\nSERVICE CLASSIFICATION NO. 14 (Cont’d)\nSTANDBY SERVICE (Cont’d)\nSPECIAL PROVISIONS (Cont'd)\n14.8 Individually Negotiated Contracts\nThe Company shall have the option to negotiate a contract for standby\nservice with a non-residential, interval-metered customer where more than\nfifty (50) percent of the customer's electric power requirement is\nsupplied from a generation facility which does not supply energy to the\ncustomer by means of the Company's delivery facilities, or where the\ncustomer demonstrates that it can economically and legally isolate and\nthat the customer will isolate absent a negotiated alternative.  The\ncustomer seeking a negotiated contract will initiate the process by\nproviding the Company with a term sheet describing the customer's requests\nand, in the case of potential electric isolation, with a written\ndescription of the potential isolation.  The Company will, within sixty\n(60) days, respond to the customer's request with a proposed rate\nagreement or with a written statement of the reason(s) why the Company\ndeclines to accept a customer's request for an individually negotiated\ncontract. \nUpon the mutual agreement of terms, between the customer and the Company,\nthe customer will be required to execute a contract which specifies the\nterms and conditions of the agreement between the Company and the\ncustomer.  The term of such contract shall be five (5) years or less.\nDuring the term of the contract, the customer will not have the right to\nisolate from the Company's system.  Negotiated rates included in such\ncontract shall be subject to all adjustments, surcharges and tax factors\nthat apply to customers who receive service under this Service\nClassification.  There will be no discounts of applicable adjustments,\nsurcharges and tax factors.  The terms and conditions of negotiated\ncontracts may provide that provisions of the negotiated contracts\nsupersede the terms of this Service Classification.  In the event of\nconflict \nbetween \nthe \ncontract \nand \nthe \nterms \nof \nthis \nService\nClassification, the provisions of the contract shall control.\nA contract summary and each executed contract shall be filed by the\nCompany with the Public Service Commission.  Each contract summary shall\nset forth the names of the parties to the contract, the location of the\ncustomer's facilities and the effective date of the contract.  The terms\nand conditions of contracts entered into pursuant to this Special\nProvision and the applicable provisions of this Service Classification may\n Received: 03/31/2004 \n Status: EFFECTIVE \n Effective Date: 07/01/2004"},{"page":96,"startToken":21104,"endToken":21331,"text":"Issued by: Michael L. Mosher, Vice President, Poughkeepsie, New York \nPSC NO: 15 ELECTRICITY                                                                                                           LEAF:         272.16  \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                               REVISION:           1  \nINITIAL EFFECTIVE DATE: 06/01/15                                                           UPERSEDING REVISION:             0 \nIssued in Compliance with Order in C. 14-E-0488 Dated April 20, 2015 \n \n \n \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \nSPECIAL PROVISIONS (Cont'd) \n \n14.8 (Cont’d) \n \nbe the subjects of confidentiality agreements entered into between the Company and the customer.  To the \nextent agreed upon in an individually negotiated contract, the Company will request that the Commission treat \nthe filed document as confidential and exempt from disclosure under the Freedom of Information Law (FOIL); \nprovided, however, that the Company shall have no obligation to obtain such treatment of any filing it makes \nwith the Commission.  \n \n \n \nFORM OF CONTRACT SUMMARY \n \nSummary \n \nNegotiated Standby Service Contract \n \n \nOn      [date]     , the Company entered into a Negotiated Standby Service Contract pursuant to Special   \n \nProvision 14.8 of P.S.C. No. 15 - Electricity with       [customer name]      .  Standby service under this \n \ncontract will be provided to the customer's facilities at     [location]      .  The effective date of this  Negotiated   \n \nStandby Service Contract is      [date]    . \n \nThis summary has been filed pursuant to Special Provision 14.8 of P.S.C. No. 15 - Electricity. \n \nIssued by:      [corporate officer]      , Poughkeepsie, New York \n \n \nDated:                  ________  \n \n Received: 05/27/2015 \n Status: EFFECTIVE \n Effective Date: 06/01/2015"},{"page":97,"startToken":21331,"endToken":21728,"text":"PSC NO: 15 ELECTRICITY \n                                   LEAF:    272.17  \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                               REVISION:             3 \nINITIAL EFFECTIVE DATE: 06/01/19                                                           SUPERSEDING REVISION:             2 \nIssued in Compliance with Order in C. 19-E-0079 Dated May 16, 2019 \n \n \n \n                                     Issued by: Anthony S. Campagiorni, Vice President, Poughkeepsie, New York \n \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \n \nSPECIAL PROVISIONS (Cont’d) \n \n14.9     Standby Rate Exemptions for Certain Combined Heat and Power Systems \n \n \nA customer who installs a new combined heat and power (CHP) system \n(1) on or after June 1, 2015 and before May 31, 2021; \n(2) with a capacity greater than 1 MW and less than 15 MW; and, \n(3) that would otherwise be subject to the standby rates of this Service Classification \n \nshall have the option of (a) a one-time exemption from the standby rates of this Service \n \nClassification by taking service at the standard rates of the applicable Parent Service \n \nClassification; or (b) service at the standby rates of this Service Classification. \n \nA customer meeting the aforementioned requirements is required to install, at the customer’s expense, a \nrevenue grade, interval meter to measure generation output with telecommunications capability at their on-\nsite facility.  The interval meter must be compatible with the Company’s metering infrastructure, and the \ncustomer must provide and maintain all meter communications services.  In cases where the Company is \nunable to read the meter through the customer provided telecommunications equipment, and the Company \nhas determined that the problem is not caused by the Company’s equipment, the customer will be assessed \nan $80.00 on-site meter reading charge each meter reading cycle until the condition is corrected. \n \nA customer meeting the aforementioned requirements will have the opportunity to exercise between June 1, \n2015 and May 31, 2021, inclusive, a one-time election to be exempt from the standby rates of this Service \nClassification.  Once elected (a) such exemption will be effective for four years running from the in-service \ndate of the system, or (b) the customer may exercise the option to exit the exemption one time prior to the \nend of its four-year exemption period. \n \nUpon expiration of the exemption or exercise of the option to exit the exemption, the customer will be \nsubject to the standby rates of this Service Classification as they may be modified or superseded as \napproved by the Public Service Commission. \n \n \n Received: 05/31/2019 \n Status: EFFECTIVE \n Effective Date: 06/01/2019"},{"page":98,"startToken":21728,"endToken":22122,"text":"Issued by: Anthony S. Campagiorni, Vice President, Poughkeepsie, New York \n \n \nPSC NO: 15 ELECTRICITY \n                                   LEAF:    272.17.1 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                            REVISION:                0 \nINITIAL EFFECTIVE DATE: 01/01/17                                                        SUPERSEDING REVISION:              \nIssued in Compliance with Order in C. 14-M-0101 Dated May 19, 2016 \n \n \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \n \nSPECIAL PROVISIONS (Cont’d) \n \n \n14.10 \nA Customer with a private generating facility connected to the Company’s primary distribution system may \nuse the output of the generating facility to supply two or more accounts taking service under this Service \nClassification (“Standby Service accounts”), as long as all of the following conditions are met: \n \n(a) Eligibility: \n \n(1) Standby Service Accounts: \n \n(a) The Standby Service accounts designated by the customer and the account associated with \nexport of the generating facility must all be established in a single customer’s name (“Single \nParty Offset”); or \n \n(b) The generating facility and the Standby Service accounts designated by the customer to \nreceive the output of the generating facility may be established in two or more customer \nnames (“Multi-Party Offset”), provided all of the following conditions are met: \n \n(i) at least one of the Standby Service accounts must be in the same customer name as the \nowner or operator of the generating facility (“Sponsor”) and have a Contract Demand \nequal to 10 percent or more of the nameplate rating of the generating facility; \n(ii) the Sponsor will be responsible for coordinating the interconnection and operation of the \ngenerating facility with the Company; and \n(iii) at the time of application under the Multi-Party Offset, the Sponsor must submit signed \nMulti-Party Offset Recipient Participation Forms for all Standby Service accounts to be \nsupplied by the output of the Sponsor’s generating facility (“Recipient Accounts”) and a \nsigned Multi-Party Offset Percentage Allocation Form.  Both forms will be available on \nthe Company’s website. \n \n(2) The generating facility must: (i) have a total nameplate rating of over 2 MW but no more than 20 \nMW; and (ii) meet eligibility criteria for designation as efficient “combined heat and power” \npursuant to the order of the Public Service Commission, dated January 23, 2004, in Case 02-E-\n0781, except with  respect to maximum generating capacity. The generating facility may have \nmore than one generating unit so long as the aggregate nameplate rating conforms to (i) above. \n \n \n \n Received: 08/01/2016 \n Status: EFFECTIVE \n Effective Date: 01/01/2017"},{"page":99,"startToken":22122,"endToken":22534,"text":"PSC NO: 15 ELECTRICITY \n                                   LEAF:    272.17.2 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                            REVISION:             1                  \nINITIAL EFFECTIVE DATE: 01/01/2024                                                    SUPERSEDING REVISION:                0 \nIssued in Compliance with Order in Case 15-E-0751 dated October 13, 2023 \n \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \n \nSPECIAL PROVISIONS (Cont’d) \n \n14.10 \n(Cont’d) \n \n(a) Eligibility: - (Cont’d) \n \n(3) The generating facility and the Standby Service accounts must all be located within a single \n“premises.”  For purpose of this Special Provision, “premises” is defined as follows: \n \n(a) Under Single Party Offset, “premises” shall mean “a parcel of land; or more than one building \nand/or parcel of land proximate to each other if there is common use, whether or not such \nbuildings or parcels are separated by public or private roads.”  The accounts of a customer \nwhose buildings or parcels of land are not physically interconnected may meet the definition \nof a single “premises” upon the customer’s demonstration of common use to the Company. \n \n(b) Under Multi-Party Offset, “premises” means either (i) a single building or (ii) multiple \nbuildings in which each Customer is connected to the generating facility by a private thermal \nloop. \n \n(4) Each Recipient Account shall have no other source of generation located on the premises and shall \nnot participate under the provisions of General Information Sections 37, 38 and 46. \n \n(5) Each Standby Service account and the export of the generating facility (“Output Meter”) must be \nseparately metered using Commission-approved, revenue grade, interval metering with \ntelecommunications capability. The metering must be compatible with the Company’s metering \ninfrastructure, including compatibility with the Company’s meter reading systems and \ncommunication systems. The communications service for the account associated with the \ngenerating facility’s export and for each Standby Service account must be provided and \nmaintained at customer expense and must be operational before the customer may take service. \n \n(6) The communications service for the account associated with the generating facility’s export and \nfor each Standby Service account must be provided and maintained at customer expense and must \nbe operational before the customer may take service. \n \n \n(7) A Customer may take service under Service Classification No.10 if the export of the generating \nfacility exceeds the aggregate registered kilowatt hour usage on the Standby Service accounts. \nOtherwise, at the Company’s discretion, the Company may terminate service under this Special \nProvision or make no payments for the export. \n \n \n Received: 12/15/2023 \n Status: EFFECTIVE \n Effective Date: 01/01/2024"},{"page":100,"startToken":22534,"endToken":22842,"text":"Issued by: Anthony S. Campagiorni, Vice President, Poughkeepsie, New York \n272.17.3 \n \nPSC NO: 15 ELECTRICITY \n                                   LEAF:    272.17.3 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                            REVISION:                0 \nINITIAL EFFECTIVE DATE: 01/01/17                                                        SUPERSEDING REVISION:              \nIssued in Compliance with Order in C. 14-M-0101 Dated May 19, 2016 \n \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \n \nSPECIAL PROVISIONS (Cont’d) \n \n14.10 (Cont’d)  \n \n(b)  Interconnection: \n                              \nThe interconnection will be subject to the interconnection charges specified in the Interconnection \nRequirements and Fees provisions of this Service Classification. In addition, the interconnection must \nbe technically and economically practicable, and the connection and operation of such facility shall not \njeopardize the safety or operation of the Company’s system, facilities or other customers. \n \n(c) Accounts Supplied by the Generating Facility’s Output: \n \n(i) Each account must be eligible for billing under Standby Service rates and must be billed under the \nStandby Service rate applicable to that individual account. \n \n(ii)  All Standby Service accounts taking service under this Special Provision must be either all Full \nService or all Retail Access. \n \n(ii) If the customer is a Retail Access Customer, all supply in excess of that supplied by the \ncustomer’s private generating facility must be supplied by a single ESCO unless the customer \nelects to be a Direct Customer. \n \n(iii) No account served under this Special Provision may be served under any economic development \nprogram specified in General Information Sections 40, 41 and 45. \n \n(iv) None of the accounts may receive Consolidated Billing as described in General Information \nSection 35. \n \n(d) Contract Demand for Each Account Supplied by the Generating Facility’s Output: \n \n                                \n \nThe Contract Demand for each account will be determined based on the maximum potential demand \non the Company’s system to serve that individual account, including the delivery of supply from all \nsources.     \n \n Received: 08/01/2016 \n Status: EFFECTIVE \n Effective Date: 01/01/2017"},{"page":101,"startToken":22842,"endToken":23247,"text":"PSC NO: 15 ELECTRICITY \n                                   LEAF:    272.17.4 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                            REVISION:                0 \nINITIAL EFFECTIVE DATE: 01/01/17                                                        SUPERSEDING REVISION:              \nIssued in Compliance with Order in C. 14-M-0101 Dated May 19, 2016 \n \n \n                                     Issued by: Anthony S. Campagiorni, Vice President, Poughkeepsie, New York \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \nSPECIAL PROVISIONS (Cont’d) \n \n14.10 (Cont’d)  \n \n(e) Billing Applicable to Each Account Supplied by the Generating Facility’s Output: \n \n \n(1) For purposes of this Special Provision, the following definitions apply: \n \nFor Accounts Supplied under the Single Party Offset: \n \n“Allocated As-Used Generator Demand” means, for each account supplied by the \ngenerating facility’s output, the demand registered on the account’s meter(s) multiplied \nby the lower of: (a) 1 or (b) the ratio of the demand registered on the meter(s) measuring \nthe generating facility’s output to the sum of demands registered on the meters of all \nStandby Service accounts supplied by the generating facility’s output. \n \n“Allocated Generator Supply” means, for each account supplied by the generating \nfacility’s output, the total kilowattthours registered on the account’s meter(s) multiplied \nby the lower of: (a) 1 or (b) the ratio of the total kilowatthours registered on the meter(s) \nmeasuring the generating facility’s output to the sum of the kilowatthours registered on \nthe meters of all Standby Service accounts supplied by the generating facility’s output.  \n \n \nFor Accounts Supplied under the Multi-Party Offset: \n \n“Allocated As-Used Generator Demand” means, for each Recipient Account, the lower \nof: (a) the demand registered on the Recipient Account or (b) the demand registered on \nthe meter(s) measuring the generating facility’s output multiplied by the Recipient \nAccount’s Percentage Allocation.  If the generating facility’s output multiplied by the \nRecipient Account’s Percentage Allocation exceeds the demand registered on the \nRecipient Account, the excess amount shall not be redistributed to other accounts nor \ncarried forward to the succeeding billing period. \n \n“Allocated Generator Supply” means, for each Recipient Account, the lower of: (a) the \ntotal kilowatthours registered on the Recipient Account’s meter(s) or (b) the total \nkilowatthours registered on the meter(s) measuring the generating facility’s output \nmultiplied by the Recipient Account’s Percentage Allocation.  If the generating facility’s \noutput multiplied by the Recipient Account’s Percentage Allocation exceeds the \nkilowatthours registered on the Recipient Account’s meter(s), the excess amount shall be \ncredited to the extent described in Special Provision 14.10 (a)(6). \n \n \n \n \n                            \n  \n Received: 08/01/2016 \n Status: EFFECTIVE \n Effective Date: 01/01/2017"},{"page":102,"startToken":23247,"endToken":23745,"text":"Issued by: Anthony S. Campagiorni, Vice President, Poughkeepsie, New York \n \nPSC NO: 15 ELECTRICITY \n                                   LEAF:    272.17.5 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                            REVISION:                0 \nINITIAL EFFECTIVE DATE: 01/01/17                                                        SUPERSEDING REVISION:                \nIssued in Compliance with Order in C. 14-M-0101 Dated May 19, 2016 \n \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \n \nSPECIAL PROVISIONS (Cont’d) \n \n14.10 (Cont’d)  \n \n(1) For Accounts Supplied under the Multi-Party Offset: - (Cont’d) \n \n“Percentage Allocation” means the percentage of the generating facility’s output that the \nSponsor has allocated to each Recipient Account under the Multi-Party Offset, a single \npercentage will be applied to both the Allocated As-Used Generator Demand and the \nAllocated Generator Supply.  The Percentage Allocations must total 100 percent, of which the \nSponsor must establish: (a) a Percentage Allocation of 10 percent of more to a single \nRecipient Account in the Sponsor’ name; and (b) a Percentage Allocation of no less than 5 \npercent or more than 90 percent to each additional Recipient Account.  The Recipient \nAccounts and the Percentage Allocation to each must be assigned in writing by the Sponsor, \nusing the Multi-Party Offset Percentage Allocation Form found on the Company’s website, at \nleast 30 days before commencing service under the Multi-Party Offset.  The Percentage \nAllocations and the Recipient Accounts may be changes as described on the Form.  No credits \nwill be applied if the Sponsor ceases to have a Recipient Account or ceases to own or operate \nthe generating facility.  If a Recipient Account is closed, its credits will be forfeited unless the \nCompany receives a new Form within 30 days of the account’s closure. \n \nAllocated As-Used Generator Demand and Allocated Generator Supply will be determined \nfor each 15-minute interval. Adjustments will be made for transformation losses as applicable. \n \n \n(2)  Each account supplied by the generating facility’s output will be billed under the Standby \nService rates of this Service Classification, as modified below: \n \n(i)  An additional Customer Charge of $50.00 per account per billing period exclusive of the \nIncrease in Rates and Charges will be applicable to cover incremental billing and \nadministrative costs associated with providing service under this provision. \n \n(ii)  The per-kWh and per-kW delivery charges and adjustments described within General \nInformation Section 36 will be applied to the total kilowattthours registered on the \naccount’s meter(s) reduced by the Allocated Generator Supply for each 15-minute \ninterval (adjusted for losses as applicable) and the Contract Demand, respectively. \n \n(iii)  For each 15-minute interval, the registered demand on the account’s meter(s) will be \nreduced by the Allocated Generator Demand for purposes of determining the daily \nmaximum demand that is used for billing As-Used Daily Demand Delivery Charges. \n \n \n(iv)  If the Customer purchases supply from the Company, the per-kWh supply charges and \nadjustments described within this Service Classification, will be applied to the total \nkilowatthours registered on the account’s meter(s) reduced by the Allocated Generator \nSupply for each 15-minute interval, as adjusted for losses as applicable. \n \n \n Received: 08/01/2016 \n Status: EFFECTIVE \n Effective Date: 01/01/2017"},{"page":103,"startToken":23745,"endToken":23946,"text":"Issued by: Anthony S. Campagiorni, Vice President, Poughkeepsie, New York \n272 \nPSC NO: 15 ELECTRICITY \n                                   LEAF:    272.17.6 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                            REVISION:                0 \nINITIAL EFFECTIVE DATE: 01/01/17                                                        SUPERSEDING REVISION:              \nIssued in Compliance with Order in C. 14-M-0101 Dated May 19, 2016 \n \n \n \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \n \nSPECIAL PROVISIONS (Cont’d) \n \n14.10 (Cont’d)  \n \n(3)  The Allocated As-Used Generator Demand and Allocated Generator Supply will be assumed \nto be zero for time periods where there is insufficient interval data available to ascertain that \nthe generating facility supplied output to any associated Standby Service account. \n \nBills may be estimated pursuant to General Information Section 14. If interval data is \nestimated on a Standby Service account, that data will be used in the calculation of the \nAllocated As-Used Generator Demand for all other accounts. If actual data later becomes \navailable, the account will be rebilled based on the actual registered demand on the meter less \nthe previously determined allocated As-Used Generator Demand for such account. \n \n \n(f)  The customer will be assessed a Reactive Demand Charge pursuant to the Reactive Demand \nsection of this Service Classification. \n \n Received: 08/01/2016 \n Status: EFFECTIVE \n Effective Date: 01/01/2017"},{"page":104,"startToken":23946,"endToken":24514,"text":"PSC NO: 15 ELECTRICITY \n                                   LEAF:    272.17.7 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                             REVISION:               4                \nINITIAL EFFECTIVE DATE: 01/01/2024                                                     SUPERSEDING REVISION:               3 \nIssued in Compliance with Order in Case 15-E-0751 dated October 13, 2023 \n \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \n \n \n  \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \n \nSPECIAL PROVISIONS (Cont’d) \n \n14.11 \nStandby Reliability Credit  \n \nThe Standby Reliability Credit shall not apply to customers billed under the revised Standby Service rates \npursuant to case 15-E-0751 except for customers initiating service under this Service Classification prior to \nMarch 16, 2022. A Standby Reliability Credit (“Credit”) is available to Customers taking service under this \nservice classification, excluding customers with stand-alone storage as referenced in General Information \nSection 48.B. Such credit will be available for service taken under this service classification during a \nprevious Measurement Period for which interval metered data was available. The Credit will be earned \nwhen a Standby Customer reduces their load below their Contract Demand, over two consecutive Summer \nPeriods in which interval metered data is available during defined Measurement Periods. In the event that a \nCustomer does not yet have interval metered data available, they may determine their own maximum \nanticipated demand (net of load reduction or generation assets) pursuant to the Contract Demand provisions \nof this service classification for use in the calculation. The Credit will be equal to the difference between \nthe Standby Customer’s Contract Demand in kW, and their highest kW demand recorded on the \nCustomer’s interval meter (net of generation) during the previous Measurement Period, multiplied by the \nContract Demand Delivery Charge per kW that is in effect on October 1 of the year in which the credit is \ndetermined. The Credit will be applied to the Customer’s successive 12 monthly bills commencing in \nNovember until the following October.  \n \nA Customer seeking a Credit must request such Credit by October 14 of each year for which the Credit is \nsought and, at the same time, specify the Outage Events that the Customer requests to be excluded from the \nMeasurement Period. If October 14 falls on a weekend or holiday, the Company will accept requests until \nthe next business day. If service is taken under the Multi-Party Offset of Special Provision 14.10, the Credit \nwill be applied to the Recipient Account in the Sponsor’s name; provided, however, that if the Sponsor has \nmore than one Recipient Account in its name, the Credit will be applied to the Sponsor’s account which has \nthe highest Contract Demand. \n \nIf the Customer is billed under Special Provision 14.10, the kW to be credited on each Standby Service \naccount supplied by the generating facility’s output will be based on the total kW to be credited multiplied \nby the ratio of the Contract Demand on the Standby Service account to the aggregated Contract Demands \non all the Standby Service accounts supplied by the generating facility’s output. \n \nIf service is taken under the Multi-Party Offset of Special Provision 14.10, the Credit for any Measurement \nPeriod will be equal to the product of: (a) and the difference between the customer’s contract demand and \ncustomer’s highest recorded demand during the Measurement Period, excluding Outage Events, and (b) the \nContract Demand Delivery Charge per kW that is in effect on October 14 of the year in which the Credit is \ndetermined. \n \n \n \n Received: 12/15/2023 \n Status: EFFECTIVE \n Effective Date: 01/01/2024"},{"page":105,"startToken":24514,"endToken":25039,"text":"PSC NO: 15 ELECTRICITY \n                                                LEAF:   272.17.8 \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                             REVISION:              5               \nINITIAL EFFECTIVE DATE: 05/31/2025                                                     SUPERSEDING REVISION:               3 \nIssued in Compliance with Order in C. 15-E-0751 dated October 13, 2023 \n \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York  \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \n \nSPECIAL PROVISIONS (Cont’d) \n \n14.11 (Cont’d)  \n \nFor purposes of Special Provision 14.11 only, the following definitions apply: \n \n \n \n“Measurement Period” is defined as weekdays from 7 a.m. to 11 p.m. during the previous two  \nconsecutive full Summer Periods provided, however, that the first year in which a Customer seeks \na Credit, the Measurement Period is from 7 a.m. to 11 p.m. during the previous full Summer \nPeriod only. The measurement period will exclude Outage Events, regardless of cause, as selected \nby the Customer, as well as holidays (i.e., Independence Day (observed) if it falls on a weekday \nand Labor Day). \n \n“Outage Events” are up to three time blocks for each Summer Period that, in aggregate, are \ncomprised of no more than five 24-hour time periods, excluding weekends and holidays. If a time \nblock contains a time period of less than 24 hours, the time period will be rounded up to the next \n24 hours. 24-hour periods cannot be applied on a partial basis. If a time block encompasses a \nholiday or weekend, the start of the 24-hour period on the day prior to the holiday weekend until \nthe same hour the next business day will be considered to be a single 24-hour period.  \n  \n \n \n“Summer Period” for purposes of Special Provision 14.11 only, is June 1 through September 30. \n \nTo be eligible for the Credit: (a) the output of a Standby Customer’s generating facility must be separately \nmetered using an Output Meter that the Customer arranges to be furnished and installed at the Customer’s \nexpense; and (b) the Customer, at its expense, must provide and maintain communications service for the \nOutput meter. The Output meter must be Commission-approved, revenue grade, interval metering with \ntelecommunications capability. The metering must be compatible with the Company’s metering \ninfrastructure, including compatibility with the Company’s meter reading systems and communication \nsystems. \n \n \n14.12     Optional Opt-in for Standby Service \n \nAny customers taking service under a metered service classification who are not required to take Standby \nService may “opt-in” to the rates offered under this Service Classification in lieu of the customer’s Parent \nService Classification as of May 31, 2025. Customers initiating service under this Special Provision will be \nrequired to remain on Standby Service rates for a minimum of twelve months. \n \nMetering \nCustomers taking service under this Special Provision must comply with the metering requirements of this \nService Classification. and be subject to incremental metering charge applicable under the Hourly Pricing \nProvision of the tariff if the customer is required under their parent service classification. \n \nTerm \nA customer taking service under this Special Provision may discontinue service under this Service \nClassification at any time, but will not be able to opt back into Standby Service for a minimum of one year. \n \n Received: 05/16/2025 \n Status: EFFECTIVE \n Effective Date: 05/31/2025"},{"page":106,"startToken":25039,"endToken":25248,"text":"PSC NO: 15 ELECTRICITY \n LEAF: 272.18  \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION      \n REVISION: \n  1   \nINITIAL EFFECTIVE DATE: 01/01/2024        \nSUPERSEDINGREVISION:       0 \nIssued in Compliance with Order in Case 15-E-0751 dated October 13, 2023   \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \nSTANDBY SERVICE (Cont’d) \nAPPLICATION FOR ELECTRIC STANDBY SERVICE \nCENTRAL HUDSON GAS & ELECTRIC CORPORATION \nApplication for Electric Standby Service \nPursuant to S.C. No. 14 of P.S.C. No. 15 – Electricity (“Tariff”) \nStandby Service provided under S.C. No. 14 is generally applicable to a) any customer operating on-site generation \n(“OSG”) with a total nameplate rating greater than, or expected to be greater than, 15% of the customer’s maximum \npotential demand, or b) customers otherwise opting in to standby service rates, and where the customer elects to \nhave Central Hudson (“Company”) supply and/or deliver energy by means of the Company’s delivery facilities. \n1.\nApplicant\nAccount Name:\nAddress:\nCity:\nZip:      \nContact:\nPhone No.:      \nE-mail Address:\n   Central Hudson Acct. Number:       \n2.\nGenerator/Service Specifications\nCurrently have OSG:     YES /  NO___________(if answered No, proceed to #3)\nOSG In Service Date (Actual or Expected):\nNameplate Rating:                         kW \n                             kVa\nOSG Generator Technology Type:\n Received: 12/15/2023 \n Status: EFFECTIVE \n Effective Date: 01/01/2024"},{"page":107,"startToken":25248,"endToken":25497,"text":"Issued by: Anthony S. Campagiorni, Vice President, Poughkeepsie, New York \nPSC NO: 15 ELECTRICITY                                                                      LEAF: 272.18.1                   \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                  REVISION:         0      \nINITIAL EFFECTIVE DATE: 01/01/17                \n \n    SUPERSEDING REVISION:         0 \nIssued in Compliance with Order in C. 14-M-0101 Dated May 19, 2016 \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \nAPPLICATION FOR ELECTRIC STANDBY SERVICE (Cont’d) \n \n \nCENTRAL HUDSON GAS & ELECTRIC CORPORATION \n \nApplication for Electric Standby Service \nPursuant to S.C. No. 14 of P.S.C. No. 15 – Electricity (“Tariff”) \n \n \nIf your premises will be supplied by Efficient CHP that is rated over 2 MW but no more than 20 MW and connected to \nthe Company’s primary distribution system check below if: \n \n \n________  You request Standby Service for two or more of your accounts at your premises pursuant to the Single \nParty Offset described in Special Provision 14.10. \n \nCH Acct Number \nService Address \nContract Demand (kW) \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n________  You request Standby Service pursuant to the Multi-Party Offset as described in Special Provision 14.10,  \nsuch that you request that the output of the generating facility that you own or operate at your premises \nbe used to serve your own account(s) and one or more other customers’ accounts in the same building. \nYou must submit a Multi-Party Offset Recipient Participation Form from each customer who will \nreceive an allocation and a Multi-Party Offset Percentage Allocation Form, both of which are available \non the Company’s website.  \n \n \n    \n   \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n Received: 08/01/2016 \n Status: EFFECTIVE \n Effective Date: 01/01/2017"},{"page":108,"startToken":25497,"endToken":25813,"text":"PSC NO: 15 ELECTRICITY \n                             LEAF: 272.19  \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION                                   REVISION:          2       \nINITIAL EFFECTIVE DATE: 01/01/2024                                                           SUPERSEDING REVISION:          0 \nIssued in Compliance with Order in Case 15-E-0751 dated October 13, 2023 \n \n                        Issued by: Joseph Hally, Vice President, Poughkeepsie, New York  \n \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \n \nAPPLICATION FOR ELECTRIC STANDBY SERVICE (Cont’d) \n \n \n3. \nService Options \n \n               Applicant elects to take standby service under S.C. No. 14. \n \n                Applicant is opting-in pursuant to Special Provision 14.12. \n \n               Applicant would otherwise qualify for non-demand metered service under  \n S.C. Nos. 1, 2 or 6 and elects to be billed pursuant to the rates, terms and  \n conditions of their Parent Service Classification under Special Provision  \n 14.4 of the Tariff. \n \n               Applicant has entered into a separately negotiated contract according to  \n Special Provision 14.8 of the Tariff. \n \n               Applicant would otherwise qualify for service under S.C. No. 2 demand \n rates, has a Contract Demand less than 50 kW and declines to take service  \n under the rates of S.C. No. 14.  Applicant will be billed under the  \n applicable rates of S.C. No. 2 pursuant to Special Provision 14.3 of the  \n Tariff. \n \n                Applicant declines service under S.C. No. 14 and will electrically isolate \n their facility from the Company’s electric system in accordance with the  \n Tariff. \n \n                Standby service is not applicable to the Applicant’s OSG for the  \n  following reason (do not complete Sections 4 through 7, below): \n \n               Applicant’s OSG has a total nameplate rating of 15% or  \n less of the Applicant’s maximum potential demand as  \n defined in the Tariff. \n               Applicant’s OSG qualifies as a photovoltaic generating  \n system of 10 kW or less or as a farm waste generating  \n system of 400 kW or less as defined in the Tariff. \n               Applicant’s OSG is defined as an Emergency Generator  \n according to the Tariff. \n Received: 12/15/2023 \n Status: EFFECTIVE \n Effective Date: 01/01/2024"},{"page":109,"startToken":25813,"endToken":26067,"text":"PSC NO: 15 ELECTRICITY \n LEAF: 272.20  \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION      \nREVISION:     1 \nINITIAL EFFECTIVE DATE: 01/01/2024  \nSUPERSEDING REVISION:      0 \nIssued in Compliance with Order in Case 15-E-0751 dated October 13, 2023 \n   Issued by: Joseph Hally, Vice President, Poughkeepsie, New York \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \nSTANDBY SERVICE (Cont’d) \nAPPLICATION FOR ELECTRIC STANDBY SERVICE (Cont’d) \n4.\nContract Demand Election\nThe Applicant hereby requests the following Contract Demand option, in accordance with the Tariff:\n   Applicant nominates a Contract Demand level of    \n  kW. \n   Applicant requests Central Hudson to establish the Contract Demand \n level. \n5.\nInterconnection\nIn addition to submitting this Application for Electric Standby Service, Applicants installing OSG are\nrequired to submit an Application for Interconnection and an executed Interconnection Agreement, both of\nwhich are available from Company representatives.\n6.\nMetering\nThe Applicant agrees to provide the Company with sufficient space to install its meters and metering\nfacilities in locations acceptable to the Company, and agrees that the Applicant’s OSG will not be operated\nuntil such meters and metering facilities are installed and operational.\nInterval metering and telemetering capability are required of Applicants taking service under S.C. No. 14.\nApplicants who would otherwise qualify for service under S.C. No. 2 demand rates, have a Contract\nDemand less than 50 kW and elect to take service under the rates of S.C. No. 14, in accordance with\nSpecial Provision 14.3, are required to install interval metering with telemetering capability.\n Received: 12/15/2023 \n Status: EFFECTIVE \n Effective Date: 01/01/2024"},{"page":110,"startToken":26067,"endToken":26283,"text":"PSC NO: 15 ELECTRICITY \n                             LEAF: 272.21  \nCOMPANY: CENTRAL HUDSON GAS & ELECTRIC CORPORATION          \n           REVISION:          3       \nINITIAL EFFECTIVE DATE: 01/01/2024  \n \n \n            SUPERSEDING REVISION:          1      \nIssued in Compliance with Order in Case 15-E-0751 dated October 13, 2023 \n \n \nIssued by: Joseph Hally, Vice President, Poughkeepsie, New York  \n \nSERVICE CLASSIFICATION NO. 14 (Cont’d) \n \n \nSTANDBY SERVICE (Cont’d) \n \n \nAPPLICATION FOR ELECTRIC STANDBY SERVICE (Cont’d) \n \n \n \n7. \nElectricity Requirements Election \n \n        The Applicant can elect to purchase electric requirements in excess of the amounts supplied by their OSG  \n         from either the Company or a Retail Supplier, in accordance with the Tariff. \n \n                               Applicant elects to purchase electricity requirements from the Company  \n          pursuant to the provisions of the Hourly Pricing Provision. \n \n                        Applicant elects to purchase electricity requirements pursuant to the \n          Company’s Retail Access Program.   \n \n \nThis Application for Electric Standby Service supplements but does not supersede any pre-existing Applications for \nElectric Service under the Tariff.     \n \nService to be supplied to the Applicant will be supplied and conditioned on the Applicant’s ongoing compliance \nwith the terms, conditions and procedures set forth in both the Tariff and the Company’s Specifications and \nRequirements For Electric Installations (“Blue Book”) as both may be amended from time to time.   \n \n  \n \n \n                                                                         \n \nCentral Hudson Gas & Electric Corp. \n(Applicant) \n \nBy:                                                                   \n \nBy:                                                           \n \n \n \n                                                                         \n \n                                                                 \n \n \n \n(Title)  \n \n \n \n \n \n(Title) \n \nDate:                                                                 \n \nDate:                                                        \n Received: 12/15/2023 \n Status: EFFECTIVE \n Effective Date: 01/01/2024"},{"page":111,"startToken":26283,"endToken":26294,"text":"Consolidated Edison \nService Classification No. 9: Rate II - General - Large \n- Time-of-Day"},{"page":112,"startToken":26294,"endToken":26294,"text":""},{"page":113,"startToken":26294,"endToken":26294,"text":""},{"page":114,"startToken":26294,"endToken":26294,"text":""},{"page":115,"startToken":26294,"endToken":26294,"text":""},{"page":116,"startToken":26294,"endToken":26307,"text":"Consolidated Edison \nService Classification No. 9: Rate V - General - Large \n - Standby Service (Large)"},{"page":117,"startToken":26307,"endToken":26307,"text":""},{"page":118,"startToken":26307,"endToken":26307,"text":""},{"page":119,"startToken":26307,"endToken":26307,"text":""},{"page":120,"startToken":26307,"endToken":26307,"text":""},{"page":121,"startToken":26307,"endToken":26307,"text":""},{"page":122,"startToken":26307,"endToken":26307,"text":""},{"page":123,"startToken":26307,"endToken":26307,"text":""},{"page":124,"startToken":26307,"endToken":26307,"text":""},{"page":125,"startToken":26307,"endToken":26307,"text":""},{"page":126,"startToken":26307,"endToken":26307,"text":""},{"page":127,"startToken":26307,"endToken":26307,"text":""},{"page":128,"startToken":26307,"endToken":26307,"text":""},{"page":129,"startToken":26307,"endToken":26307,"text":""},{"page":130,"startToken":26307,"endToken":26307,"text":""},{"page":131,"startToken":26307,"endToken":26307,"text":""},{"page":132,"startToken":26307,"endToken":26307,"text":""},{"page":133,"startToken":26307,"endToken":26321,"text":"LIPA \nService Classification 2: MRP (Large General and \nIndustrial Service With Multiple Rate Periods)"},{"page":134,"startToken":26321,"endToken":26593,"text":"Long Island Power Authority \n \n \nFifth Revised Leaf No. 225 \n \nEffective: January 1, 2026 \n \nTariff for Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nI. \nSERVICE CLASSIFICATION NO. 2 - MRP \nLarge General and Industrial Service With Multiple Rate Periods: \n(Rate Codes:  284, 285, M284, M285)  \n \n1. Who Is Eligible \n \na) Customers who will use the service for any purpose other than Residential, when: \n \n \n(1) The monthly recorded demand has been more than 145 kW in any two (2) \nconsecutive months, or \n \n(2) The Authority believes an Applicant's demand will be more than 145 kW in any \nmonth.  \n \nb) Customers may choose between Rate Codes 285 and 284 below when they qualify for \nthe service. \n \nc) Customers' options to transfer between Rate Codes 285 and 284 are covered under \nSpecial Provision 10.e below. \n \nd) A Customer, as described in a. above, that has the option under Service Classification \nNo. 12 – Standby Service, can choose to pay the rates and charges associated with a \ndifferent Service Classification. \n \n2. Character of Service \n \na) Continuous, 60 hertz, alternating current.  \n \nb) Radial secondary service at approximately 120/208, 120/240, or 277/480 volts, three-\nphase; network system 120/208 or 277/480, depending on the size and characteristics of \nthe load and the circuit supplying the service.  \n \nc) Radial primary service at approximately 2,400/4,160 or 7,620/13,200 volts, depending on \nthe size and characteristics of the load and the circuit supplying the service. \n \nd) Radial Sub/Transmission Service Level at approximately 23,000 volts or higher, three \nphase, depending on the size and characteristics of the load and the circuit supplying the \nservice."},{"page":135,"startToken":26593,"endToken":26869,"text":"Long Island Power Authority \n \n \nEighteenth Revised Leaf No. 226 \n \nEffective: January 1, 2026 \n \nTariff for Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nI. \nSERVICE CLASSIFICATION NO. 2 - MRP \nLarge General and Industrial Service With Multiple Rate Periods (continued): \n(Rate Codes:  284, 285, M284, M285)  \nCharacter of Service (continued): \n \ne) The Authority may consider loads with a minimum estimated demand of 10,000 kW for \nservice at 23,000 volts or higher. \n \nf) \nThe Primary Rate will also apply to Customers served at 2,400 through 13,200 volts. \n \ng) The Sub/Transmission Service Level Rate will apply to Customers served at 23,000 volts \nor higher. \n \n3. Rates and Charges per Meter per Month:  \n \na) Schedule of Rates   \n \nThe rates for the service code are set forth below. \n \nRate Code 285 \n \nSecondary \nPrimary  \n \nSub/Transmission \n \nService Charge per day \n$  3.83            \n$  5.20  \n   \n$  5.20 \n \nRate Periods** \n \n \n \n \n \n     1 \n \n     2 \n \n \n     3 \n \n \n \n \n \nOff-Peak  \nOn-Peak * \n \nIntermediate \n \n \n \n \nall year  \nJune-Sept. except \nall \n \n \n \n \nmidnight \nSundays  \n \nother \n \n \n \n \n to 7 a.m. \n10 a.m. to 10 p.m. \nhours \n \n \nDemand Charge per kW \nSecondary  \n \nnone \n \n$  30.00 \n \n$  13.03 \nPrimary  \n \n \nnone \n \n$  24.82 \n \n$  10.95 \nTransmission \n \nnone \n \n$  20.51 \n \n$  8.98 \n \nEnergy Charge per kWh \nSecondary  \n \n$  0.0071 \n$  0.0489 \n \n$  0.0311 \nPrimary  \n \n \n$  0.0041 \n$  0.0425  \n \n$  0.0271 \nTransmission \n \n$  0.0041 \n$  0.0398 \n \n$  0.0252 \n \nMinimum Demand Charge \nper Meter per kW \nSecondary  \n \nnone \n \n$  33.50 \n \n$  9.21 \nPrimary  \n \n \nnone \n \n$  28.76 \n \n$  8.13 \nTransmission \n \nnone \n \n$  23.79 \n \n$  6.68 \n \n*For Rate M285, the modified peak period is from 3 p.m. to 10 p.m. on weekdays (Monday – \nFriday) \n** See Paragraph IV.A.10, “Daylight Savings Time,” on Leaf No. 99."},{"page":136,"startToken":26869,"endToken":27127,"text":"Long Island Power Authority \n \n \nTwentieth Revised Leaf No. 227 \n \nEffective: January 1, 2026 \n \nTariff for Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nI. \nSERVICE CLASSIFICATION NO. 2 - MRP \nLarge General and Industrial Service With Multiple Rate Periods (continued): \n(Rate Codes:  284, 285, M284, M285) \nRates and Charges per Meter per Month (continued): \n \nRate Code 284 \n \nSecondary \nPrimary  \n \nTransmission \n \nService Charge per day \n$  3.83            \n$  5.20               \n $  5.20 \n \n \nRate Periods** \n \n \n \n \n \n     1 \n \n    2 \n \n \n     3 \n \n \n \n \n \nOff-Peak \nOn-Peak * \n \nIntermediate \n \n \n \n \nall year  \nJune - Sept \n \nall \n \n \n \n \n \n \nweekdays \n \nother \n \n \n \n \n11 p.m.  \n12 noon \n \nhours \n \n \n \n \nto 7 a.m. \nto 8 p.m. \n \nDemand Charge per kW \nSecondary  \n \nnone \n \n$  59.02 \n \n$  11.68 \nPrimary \n \n \nnone \n \n$  49.44 \n \n$  8.94 \nTransmission \n \nnone \n \n$  36.96 \n \n$  6.67 \n \nEnergy Charge per kWh \nSecondary  \n \n$  0.0001 \n$  0.0417 \n \n$  0.0268 \nPrimary  \n \n \n$  0.0001 \n$  0.0298 \n \n$  0.0049 \nTransmission \n \n$  0.0001 \n$  0.0279 \n \n$  0.0047 \n \nMinimum Demand Charge \nper Meter per kW \nSecondary  \n \nnone \n \n$  54.99 \n \n$  7.25 \nPrimary \n \n \nnone \n \n$  49.57 \n \n$  6.68 \nTransmission \n \nnone \n \n$  36.88 \n \n$  5.06 \n \n \n \n* For Rate Code M284, the modified peak period is from 3 p.m. to 8 p.m. \n \n** See Paragraph IV.A.10, “Daylight Savings Time,” on Leaf No. 99. \n \nb) Adjustments to Rates and Charges \n \nEach Customer’s bill will be adjusted for the Power Supply Charge, Increases in Rates \nand Charges to Recover PILOT Payments, the Shoreham Property Tax Settlement Rider, \nthe Distributed Energy Resources Cost Recovery Rate, the Merchant Function Charge, \nthe New York State Assessment Factor, Revenue Decoupling Mechanism, the \nSecuritization Offset Charge, and the Delivery Service Adjustment."},{"page":137,"startToken":27127,"endToken":27471,"text":"Long Island Power Authority \n \n \nSecond Revised Leaf No. 228 \n \nEffective: January 1, 2009 \n \nTariff for Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nI. \nSERVICE CLASSIFICATION NO. 2 - MRP \nLarge General and Industrial Service With Multiple Rate Periods (continued): \n(Rate Codes:  284, 285, M284, M285)  \n \n4. Reactive Demand Charges - Rate Codes 284, 285, M284, and M285 \n \na) Transmission and primary service Customers who use electricity at a Power Factor of \nless than 90% and choose to pay a monthly Reactive Demand Charge of $0.27 per \nKVAR, shall pay for the additional metering equipment either when it is installed or \nthrough a monthly charge.  \n \nb) For the first twelve (12) months of billing for Reactive Demand Charges, the KVAR \ncharges will not exceed 1% of the Customer's total bill. \n \n5. How Demand is Determined \n \nThe Authority will furnish and maintain a demand meter of standard type to determine the \ndemand. The demand is the maximum 15-minute demand during the month in each Rate \nPeriod, taken to the nearest one-tenth (1/10) kilowatt. \n \n6. How the Minimum Demand Charges are Determined - All Rate Codes \n \na) The Authority will charge an annual Minimum Demand Charge to those Customers \nwhose actual billed demand revenues in Periods 1, 2, and 3 are less than the Minimum \nDemand Charges given below. The Authority will not apply this charge to new Customers \ntaking service for part of a calendar year or Customer-generators eligible for net billing. \n \nb) The Authority will use the highest recorded demands for Periods 1, 2, and 3 and multiply \nthose demands by the Minimum Demand Charges to determine the minimum amount the \nCustomer is responsible for.   \n \nc) If the sum of the Minimum Demand Charges in the three (3) Periods is greater than the \nsum of the actual billed demand revenues for the year under review, the difference will be \ncharged to the Customer's account, and \n \nd) When this difference is more than ten percent (10%) of the total annual demand \nrevenues, the Customer may choose to pay it in no more than twelve (12) equal monthly \ninstallments."},{"page":138,"startToken":27471,"endToken":27773,"text":"Long Island Power Authority \n \n \nFirst Revised Leaf No. 229 \n \nEffective: December 1, 2000 \n \nTariff for Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nI. \nSERVICE CLASSIFICATION NO. 2 - MRP \nLarge General and Industrial Service With Multiple Rate Periods (continued): \n(Rate Codes:  284, 285, M284, M285)  \n \n7. How the Net Reactive Demand is Determined \n \na) The Net Reactive Demand is the 15-minute integrated kilovolt-amperes of lagging \nreactive demand minus 48% of the 15-minute integrated kilowatt demand recorded \nduring the same 15-minute period. \n \nb) The Customer will be billed monthly for the maximum Net Reactive Demand recorded \nbetween 7:00 a.m. through 11:00 p.m. \n \nc) For billing purposes, the maximum Net Reactive Demand will be the greater of:  \n \n(1) The maximum Net Reactive Demand recorded for the month from 7:00 a.m. through \n11:00 p.m., or   \n \n(2) 100% of the maximum Net Reactive Demand recorded from June through \nSeptember, from 7:00 a.m. through 11:00 p.m., during the last eleven (11) months. \n \n8. Terms of Payment \n \nThe Customer shall pay the balance due in cash, including checks and money orders, on \nreceiving the bill. Late payments shall be subject to Late Payment Charges.  \n \n9. Term of Service \n \na) The Authority will provide service to the Customer for at least one (1) year and until \nservice is terminated either by the Customer or the Authority.  \n \nb) The Customer shall give the Authority thirty (30) days written notice when requesting \ntermination of service. \n \nc) The Authority may terminate service to the Customer in accordance with the provisions of \nthe Tariff, after giving the Customer thirty (30) days written notice. \n \nd) The Authority may require the Customer to take service at rates effective for a longer \nterm because of the investment required or other unusual conditions related to the \nservice."},{"page":139,"startToken":27773,"endToken":28112,"text":"Long Island Power Authority \n \n \nSeventh Revised Leaf No. 230 \n \nEffective: January 1, 2026 \n \nTariff for Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nI. \nSERVICE CLASSIFICATION NO. 2 - MRP \nLarge General and Industrial Service With Multiple Rate Periods (continued): \n(Rate Codes:  284, 285, M284, M285)  \n \n10. Special Provisions \n \na) Corrective Equipment Requirements \n \nWhen the installation includes welders, x-rays, or other apparatus having a highly \nfluctuating or large instantaneous demand, the Customer shall provide batteries, rotating \nequipment, or other corrective equipment to reduce the inrush current to an amount \nacceptable to the Authority. \n \nb) Requirements for Service at 69,000 Volts or Higher \n \nThe Applicant shall provide and maintain voltage regulating equipment and circuit \nbreakers complete with accessory equipment, using the procedures and schedules \nspecified by the Authority. \n \nc) Changes in Eligibility of Existing Accounts \n \nIf there is an Applicant for an existing account, but the Authority believes the Applicant's \nbusiness activity will change the characteristics of the account's loads, the account will be \nconsidered a new account for Service Classification purposes. \n \nd) Business Development Programs \n \n(1) Empire Zone Program  \n \n(a) The Empire Zone Program expired on June 30, 2010. Customers on this \nprogram, prior to July 1, 2010, will continue to receive rate discounts until their \npreviously agreed upon term has expired.  \n \n(b) With the exception of the Calverton portion of the Suffolk County Empire Zone, \nPrimary and Secondary Customers who qualify receive a 50% discount on their \nBase Rate Energy Charge per kWh and Period 3 Demand Charges, but only for \nthe additional energy and demand.  \n \n(c) With the exception of the Calverton portion of the Suffolk County Empire Zone, \nTransmission Customers who qualify receive a 55% discount on their Base Rate \nEnergy Charge per kWh and Period 3 Demand Charges, but only for the \nadditional energy and demand.  \n \n(d) Qualifying Primary and Secondary customers within the Calverton portion of the \nSuffolk County Empire Zone receives a 6% discount on their Base Rate Energy \nCharge per kWh and Period 3 Demand Charges, but only for the additional \nenergy and demand."},{"page":140,"startToken":28112,"endToken":28296,"text":"Long Island Power Authority \n \n \nThird Revised Leaf No. 230A \n \nEffective: January 1, 2022 \n \nTariff for Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nI. \nSERVICE CLASSIFICATION NO. 2 - MRP \nLarge General and Industrial Service With Multiple Rate Periods (continued): \n(Rate Codes:  284, 285, M284, M285)  \nSpecial Provisions (continued): \n \n(e) Qualifying Transmission customers with the Calverton portion of the Suffolk \nCounty Empire Zone receive a 7% discount on their Energy Charges per kWh \nand Period 3 Demand Charges, but only for the additional energy and demand.  \n \n(2) Excelsior Jobs Program \n \n(a) The Excelsior Jobs Program is intended to encourage business to expand or \nrelocate the Authority’s Service Area.  \n \n(b) The Authority’s discount is available to certified participants who increase their \nload by at least 25%, to a minimum of 145 kW within one (1) year of Excelsior \nProgram certification.  \n \n(c) Customers who qualify will pay $0.0158 for their Base Rate Energy Charge per \nkWh for the additional energy associated with the incremental load subsequent to \nthe ESD Approval Date. There will be no demand charges associated with the \nincremental load subsequent to the ESD Approval Date."},{"page":141,"startToken":28296,"endToken":28674,"text":"Long Island Power Authority \n \n \nEighth Revised Leaf No. 231 \n \nEffective: January 1, 2022 \n \nTariff for Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nI. \nSERVICE CLASSIFICATION NO. 2 - MRP \nLarge General and Industrial Service With Multiple Rate Periods (continued): \n(Rate Codes:  284, 285, M284, M285)  \nSpecial Provisions (continued): \n \n(3) Business Attraction/Expansion, Manufacturing Competitiveness, and Business \nIncubation Programs   \n \n(a) Customers who qualify after June 29, 2012 receive a 100% discount on their \nBase Rate Energy Charge per kWh for Periods 1, 2, and 3, in the first year of \ntheir participation in the program. Participants that qualified before June 29, 2012 \nwill continue to receive a 50% discount on their Base Rate Energy Charge, \nsubject to pro-ration as noted in the paragraph below.  \n \n(b) The discounts will decrease by one-fifth (1/5) each year after the first year until \nthe Customers are billed at the rate's regular levels at the end of the fifth (5th) \nyear. \n \n \n(c) Customers who qualify may apply for modified rate periods. The modified peak \nPeriod 2 hours are June through September, Monday through Friday, from 3 p.m. \nto 8 p.m., for Rate Code M284 and June through– September, Monday through \nFriday, from 3 p.m. to 10 p.m., for Rate Code M285. The hours June through \nSeptember, Monday through Friday from 12 noon to 3 p.m., are included in the \nIntermediate period for Rate Code M284. The hours June through September, \nMonday through Friday, from 10 a.m. to 3 p.m. and Saturday from 10 a.m. to 10 \np.m., are included in the Intermediate period for Rate Code M285. \n \ne) Choosing Rate Code 284 or Rate Code 285 \n \n \nNew Customers shall choose either Rate Code 284 or Rate Code 285 at the time of \nqualification of service. \n \n(1) Rate Code 284 Customers may choose to receive service under Rate Code 285. \n \n(2) Rate Code 285 Customers will have one opportunity to transfer to Rate Code 284. \n \n(3) Customers must request transfers between Rate Code 284 and Rate Code 285 in \nwriting, thirty (30) days before their Anniversary Date.  \n \n(4) Customers eligible for modified rating periods under Rate Code M284 and Rate Code \nM285 must follow the same rules as for Rate Code 284 and Rate Code 285 \nrespectively."},{"page":142,"startToken":28674,"endToken":28886,"text":"Long Island Power Authority \n \n \nSecond Revised Leaf No. 231A \n \nEffective: January 1, 2023 \n \nTariff for Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nI. \nSERVICE CLASSIFICATION NO. 2 - MRP \nLarge General and Industrial Service With Multiple Rate Periods (continued): \n(Rate Codes:  284, 285, M284, M285)  \nSpecial Provisions (continued): \n \nf) \nTransfer to Service Classification No. 2-L or 2L-VMRP \n \nAt their option, Customers taking service at Service Classification No. 2-MRP can be \ntransferred to Service Classification No. 2-L or at their option 2L-VMRP when: \n \n(1) The Customer requests a transfer, and  \n \n(2) The metered demand of the Customer has been less than 116 kW for twelve (12) \nconsecutive billing periods, and  \n \n(3) The transfer will take place within ninety (90) days after the Authority certifies that the \nCustomer qualifies for the services, \n \ng) Service for Religious Purposes, Supervised Community Residences, or Veterans \nOrganizations \n \nCustomers under this Service Classification who use electricity for religious purposes, for \nCommunity Residences, or Veterans Organizations as specified in Section 76 of the \nPublic Service Law, may apply for a suitable residential service after a minimum term of \none (1) year. \n \n(1) The transferring Customer shall submit a new Application to the Authority before the \ntransfer, and \n \n(2) The transfer will take place at the time of the Customer’s next meter reading."},{"page":143,"startToken":28886,"endToken":28897,"text":"LIPA \nService Classification No. 12: Standby Service and \nOptional Rate Service"},{"page":144,"startToken":28897,"endToken":29325,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264A \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service: \n(Rate Codes:  179, 680, 682) \n \n1. Who Is Eligible  \n \nThis Service Classification (SC-12) is applicable to Customers meeting the requirements of \n(a) through (d) below (Standby Service Customers) and Customers meeting the requirements \nof (e) through (f) below (Optional Rate Customers): \n \nStandby Service \n \na)  Customers who have generation installed on their site, whether the generation equipment \nis owned by the customer or a third party; or \n \nb)  Customers who are directly interconnected with a Generator, as defined as a company \nwhose primary business is the production of electricity; \n \nc)  Generators who require service from the Authority when their own electric generating \nequipment is not sufficient to meet their own load; or \n \nd)  Customers with on-site generation compensated under Value Stack, that meet the \nrequirements for compensation, and that are not otherwise exempt in accordance with \nSection P.4 of this SC-12. \n \nOptional Rate Service \n \ne) Customers that opt into SC-12, who do not otherwise meet the requirements of Standby \nService (Optional Rate Customers).  Any customer may opt into SC-12 with the exception \nof SC-5, SC-7, SC-10, SC-13 customers, unmetered customers and non-AMI metered \ncustomers. Optional Rate Customers can switch back to applicable non-Standby rates \navailable to them at any time, however, to avoid customers switching to take advantage \nof seasonal fluctuations in rate design, Optional Rate Customers that switch back to a \nnon-time-varying flat rate will not be allowed on Standby rates or other time-varying rate \ncode for a period of not less than one year. \n \nf) \nCustomers on ReCharge NY service will be assigned to Rate 680 and cannot opt-in to \nStandby Rates. \n \ng) More specifically, Standby Service shall apply to: \n \n \n(1)  Customers with on-site generation serving load that is not isolated from the grid;  \n \n \n(2)  Generators that rely on the Authority to serve electric loads that would otherwise be \nserved by the generator such as station power used for the heating, lighting, air-\nconditioning, and office equipment needs of the buildings housing the generator and \nassociated support facilities located on a generating facility’s site, and/or to facilitate the \nre-starting of the generator following an outage. Standby rates will also apply to \nGenerators that take station power through the same bus bar as they supply the grid.   \n  \nh) For Standby Service Customers, the Parent Service Classification shall be defined based \nupon the applicable Contract Demand at the delivery point (as initially calculated by the \nAuthority)."},{"page":145,"startToken":29325,"endToken":29554,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264B \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service (continued): \n(Rate Codes:  179, 680, 682)  \n \n  Who Is Eligible (continued) \n \ni) \nSame Bus Bar \n \nSame Bus Bar is defined as a common electrical point of interconnection on the same \nphysical bus bar structure located at one substation of the utility and an individual \ncustomer’s system at the single voltage level at which the customer takes service. This \ncommon point of interconnection may include up to one load serving connection, or tap, \n(such tap is in addition to the single point of delivery service from the generating \ncustomer to the Authority’s delivery system being metered), from a single physical bus \nbar (one tap must be connecting the customer's generation output to the bus and a \nsecond tap must be connecting the customer's electric service to the bus) located at an \nAuthority substation. The customer’s generation must be on a single unitary tract of land; \nadjoining and abutting the land upon which the Authority substation is located and the \npoints of delivery and receipt must not be more than 500 feet apart. The presence of \nAuthority equipment, including but not limited to switches, fuses, transformers, and circuit \nbreakers, between the point(s) of delivery is not considered Same Bus Bar."},{"page":146,"startToken":29554,"endToken":29906,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264C \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service (continued): \n(Rate Codes: 179, 680, 682)  \nWho Is Eligible (continued) \n \n2. Definitions \n \nStandby Rates will be optional for Full Requirements Customers receiving service under the \nfollowing Service Classifications. The terms and conditions of the Parent Service \nClassifications apply unless modified in Service Classification 12. \n \na) SERVICE CLASSIFICATION NO. 1 – Residential Service:  \n(1) Service Classification No. 1 (Rate Codes: 180, 194, 195, 580) \n(2) Service Classification No. 1-VTOU (Rate Codes: 190, 191, 192, 193) \n \nb) SERVICE CLASSIFICATION NO. 2- General Service - Small: \n(1) Service Classification No. 2 (Rate Code: 280) \n(2) Service Classification No. 2-VMRP (Rate Code: 292) \n \nc) SERVICE CLASSIFICATION NO. 2-L – General Service - Large: \n(1) Service Classification No. 2-L (Rate Codes: 281, 283, 291) \n(2) Service Classification No. 2L-VMRP (Rate Codes: 294) \n \nd) SERVICE CLASSIFICATION NO. 2 – MRP – Large General and Industrial Service \nWith Multiple Rate Periods: \n(1) Service Classification No. 2-MRP (Rate Codes: 284, 285, M284, M285) – Secondary \nVoltage \n(2) Service Classification No. 2-MRP (Rate Codes: 284, 285, M284, M285) – Primary \nVoltage \n(3) Service Classification No. 2-MRP (Rate Codes: 284, 285, M284, M285) – \nTransmission Voltage \n \n3. Character of Service \n \na) Continuous, 60 hertz, alternating current.  \nb) Radial secondary service at approximately 120/208, 120/240, or 277/480 volts, three \nphase; network system 120/208 or 277/480, depending on the size and characteristics of \nthe load and the circuit supplying the service. \nc)  Radial primary service at approximately 2,400/4,160, 7,620/13,200 volts depending on \nthe size and characteristics of the load and the circuit supplying the service. \nd)  Radial Sub/Transmission service at approximately 24,000 volts or higher depending on \nthe size and characteristics of the load and the circuit supplying the service. \ne)  The Primary Rate will apply to Radial primary service. The Sub/Transmission Rate will \napply to Radial transmission service. \nf) \nFor Optional Standby Customers, service must comply with parent Service Classification \nbased on the otherwise applicable Rate Code."},{"page":147,"startToken":29906,"endToken":30202,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264D \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service (continued): \n(Rate Codes: 179, 680, 682)  \n \n4. Exemptions From SC-12 \n \nThe following customers shall not be subject to SC-12, but shall be served under the \ncustomer's otherwise applicable service classification unless Customers make a one-time \nirrevocable election to forfeit or refuse the exemption and join the Standby Rate or the in \nprogress Phase-In period of Standby Rates, identified in SC-12.14.g if still applicable.  \nCustomers that qualify for the Environmentally Advantageous Technologies (EAT) Exemption \nand that request a one-time irrevocable election to join Standby Rates or the in progress \nPhase-In period for Standby Rates if still applicable, will make the request by providing thirty \n(30) days written notice to the Authority before commencing operation of the OSG. \n \na) Small Generators \n \nCustomers with a nameplate aggregate generator(s) 5 kVA or smaller that may run in \nparallel with the LIPA system. \n \nb) Customers with On-Site Generators (OSG) Less than or Equal to 15% of Maximum \nPotential Demand as identified in SC-12.14.e. \n \nc) Environmentally Advantageous Technologies (EAT) Exemptions \nCustomers who install OSG that are: \n \n(1) Solar thermal;  \n(2) Solar photovoltaic;  \n(3) Onshore and offshore wind; \n(4) Hydroelectric; \n(5) Geothermal electric; \n(6) Geothermal ground source heat; \n(7) Tidal energy; \n(8) Wave energy; \n(9) Ocean thermal; \n(10) Hybrid Solar and Battery Facilities \n(11) Fuel cells which do not utilize a fossil fuel resource in the process of generating \nelectricity. Fuel cells are permitted to utilize biomass, biogas, or hydrogen, provided \nthat the manufacture or production of such fuels does not include the combustion or \nelectrolysis of fossil fuels or non-renewable grid power in the conversion process."},{"page":148,"startToken":30202,"endToken":30674,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264E \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service (continued): \n(Rate Codes:  179, 680, 682) \nExemptions from SC-12 (continued) \n \n(12) Small, efficient types of combined heat and power (CHP) generation that do not \nexceed 1 MW of capacity and meet the following criteria:  \n(i) Annual overall thermal and electrical energy efficiency should not be less than \n60% based on the higher heating value (HHV) of the fuel input; \n(ii) The usable thermal energy component should absorb a minimum of 20% of the \nCHP facility’s total usable annual energy output; \n(iii) The OSG capacity shall be determined by aggregating the nameplate ratings of \nthe generation units, installed at its location, excluding emergency generation \nunits used only during a utility distribution system failure or in response to the \nNYISO Emergency Demand Response Program; and \n(iv) An eligible CHP facility shall demonstrate to the Authority that its generation \ninstallation meets an environmental standard of no more than 1.4 lbs./MWh of \nNOx emissions based on its electrical and mechanical output or its rated \ncapacity.  Units that have completed a Coordinated Electric System \nInterconnection Review (CESIR) by April 1, 2018 will be subject to the previously \napplicable standard of no more than 4.4 lbs./MWh of NOx emissions. \n(v) The CHP facility must be placed in service before May 31, 2021. \n(vi) Customers shall comply with the above criteria and in addition: \n1. Monitor and record efficiency data, which shall include the annual quantity of \nfuel fired, the annual quantity of generated electricity, and the annual quantity \nof the thermal heat recovered in the heat recovery process; \n2. Have records available for Authority inspection; and \n3. Retain the records for a 3-year period. \n \n(13) Energy Storage technologies with inverter capability of up to 1 MW. However, \ncustomers who install energy storage systems to help manage the demand of EV \ncharging load, with said energy storage systems having inverter capability greater \nthan 1 MW and less than or equal to the sum of nameplate EV charging capability, \nare also exempt provided that such installations meet all other applicable \ninterconnection and standby service requirements. \n \nCustomers qualifying for the EAT Exemption shall comply with all of the following \nrequirements:  \n(i) The OSG is connected to the Customer’s electric system using an automated or \nmanual transfer switch or the electrical equivalent of such a switch approved by \nthe Authority.  \n(ii) The customer executes, and the Authority accepts, an Application for Electric \nStandby Service as required under the special provisions of the applicable \nService Classification for all generators on the premises. The Customer shall \nstate its intended use of the OSG facilities on the Application for Electric Standby \nService in the blank spaces provided for special conditions."},{"page":149,"startToken":30674,"endToken":30883,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264F \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service (continued): \n(Rate Codes:  179, 680, 682) \nExemptions from SC-12 (continued) \n \nIn the event the Customer fails to comply with provisions (i) through (ii) above, the \nAuthority shall have the following rights: To bill the customer Standby Service rates \nfor those amounts of total Electric Service which the Authority reasonably estimated \nwere received by the Customer during times when Electric Service from the Authority \nwas available to the Customer.  \n \nd) Emergency Generators  \nCustomers who install or have installed an emergency power system may be exempted \nfrom the requirement of service under this SC-12 if the OSG meet the following \nrequirements:  \n(1) The Emergency OSG is not capable of being operated in parallel with the Authority's \nsystem other than for closed-transition transfer switching where the term \"closed-\ntransition transfer\" is characterized as a momentary make-before-break switching \nsequence; \n(2) The Emergency OSG is connected to the customer's electric system using an \nautomated or manual transfer switch or the electrical equivalent of such a switch \napproved by the Authority; \n(3) The Emergency OSG is used exclusively for purposes of emergency power system;"},{"page":150,"startToken":30883,"endToken":31174,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264G \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service (continued): \n(Rate Codes:  179, 680, 682) \nExemptions from SC-12 (continued): \nEmergency Generators (continued): \n \n(4) No load may be served by Emergency OSG while Electric Service is being provided \nby the Authority to the premises except: \n(i) For the periods of time as required by statute or regulation, and \n(ii) In the absence of a statutory or regulatory requirement, such times so as to \nadequately test such systems, not to exceed 10 hours per month or as otherwise \nagreed to by the Authority; and \n(iii) For periods of time called by the NYISO for Emergency Demand Response \n(EDR) or ICAP (UCAP). \n(5) The customer shall maintain an operating log for each Emergency OSG indicating \nthe date, time, hours, and purpose of each operation of each such facility. This log \nshall be made available to the Authority upon request. If the customer fails to \nmaintain this log or to provide it to the Authority on request, the Authority shall have \nthe following rights: \n(i) To bill the customer for those amounts of Electric Service which the Authority \nreasonably estimated were inappropriately supplied by the customer’s generator \nduring times when Electric Service from the Authority was available to the \ncustomer; and \n(ii) In all cases, the customer shall remain obligated to execute and have the \nAuthority accept a Standby Service Application as applicable under the special \nprovisions of the applicable service classification for all Emergency Generators \non the premises. The customer shall state its intended use of the OSG facilities \non the Standby Service Application in the blank spaces provided for special \nconditions."},{"page":151,"startToken":31174,"endToken":31465,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264H \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service (continued): \n(Rate Codes:  179, 680, 682) \n \n \n5. Application for Service \n \nStandby Service:  \n \nCustomers with on-site generation that will run in parallel with the LIPA system must apply for \nservice by providing the Authority with an executed Standby Service Application and SGIP, \nboth of which are available on the Authority’s website or from an Authority representative.  \n \nCustomers operating an OSG unit less than 10 MW and connected for parallel operation with \nthe service of the Authority may apply for service using the SGIP, also available from \nAuthority representatives. Customers in excess of 10 MW, that also have an OSG, must \nexecute an Interconnection Agreement with the Authority.  \n \nOptional Rate Service:  \n \nEligible customers must apply for service with the Authority.  \n \n6. Billing Parameters \n \nCustomers served under this service classification shall be billed according to the following \nparameters:  \n \nCustomer Service Charge: a charge for customer-related services.  \n \nContract Demand Charge: a reservation charge for the use of the Authority’s local \ndistribution system.  \n \nAs Used Peak Daily Demand Charge: a daily usage demand charge for the maximum use \nof the Authority’s delivery system during on-peak hours (as defined in the Determination of \nContract Demand section of SC12).  \n \nAs Used Off-peak Daily Demand Charge: a daily usage demand charge for the maximum \nuse of the Authority’s delivery system during Off-peak hours (as defined in the Determination \nof Contract Demand section of SC12). \n \nPower Supply Charge: a charge for the electricity supply service (Commodity) provided to \nthe customer.   \n \nSurcharges and Adjustments: a set of itemized charges for specific adjustments as \nprovided under the otherwise applicable service classification."},{"page":152,"startToken":31465,"endToken":31732,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264I \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service (continued): \n(Rate Codes:  179, 680, 682) \n \n7. Rates and Charges \n \nCustomers that receive their non-Authority supply from the New York Power Authority \n(NYPA) under the ReCharge NY program will be designated as Rate Code 680. Customers \non ReCharge NY program will pay the rates and charges under another suitable Service \nClassification. In this case, the Customer will comply with the terms of this Service \nClassification including the interconnection provision, that are in addition to, and do not \nconflict with the requirements of the suitable Service Classification. \n \nApplicable Rates and Charges: Standby Service Customers and Optional Rate Service \nCustomers will be subject to the following SC 12 rates in accordance with their Parent \nService Classification if a Standby Service Customer and their otherwise applicable service \nclassification if an Optional Rate Service Customer.  \n \na) Rate Code B1179: Parent Service Classification No. 1 – Residential Service \n \nMONTHLY RATE:  \n \n \nService Charge Per Day:  \n \n \n$0.56     \n  \n \nContract Demand Charges per kW: \nDelivery for SC-12 Customers \n \n \n$0.26 \n \n \nAs Used Off-Peak Daily Demand Charges per kW: \nDelivery for SC-12 Customers    \n \n$0.95 \n \n \nAs Used Peak Daily Demand Charges per kW:  \nDelivery for SC-12 Customers    \n \n$1.57 \n \n \n \nSC-12 customers billed under Parent Service Classification No. SC-1 rates shall have the \ndetermination of their Contract Demand (kW) and As Used Daily Demand (kW) based on \na 60-minute integrated metered demand, which shall be determined as the sum of the \nfour 15-minute intervals in an hour."},{"page":153,"startToken":31732,"endToken":31921,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264J \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \n \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service (continued): \n(Rate Codes:  179, 680, 682) \nRates and Charges (continued) \n \nb) Rate Code B1682: Parent Service Classification No. 2- General Service - Small \n \nMONTHLY RATE:  \n \n \n \nService Charge Per Day:  \n \n \n$0.56     \n  \n \nContract Demand Charges per kW: \nDelivery for SC-12 Customers \n \n \n$0.26 \n \n \nAs Used Off-Peak Daily Demand Charges per kW: \nDelivery for SC-12 Customers    \n \n$1.26 \n \n \nAs Used Peak Daily Demand Charges per kW:  \nDelivery for SC-12 Customers    \n \n$2.14 \n    \n \n \nRate Code P1682: Phase-In Charges for Parent SC-2 Small \n \nDelivery Charges will be calculated as identified in SC-12.14.g. Customer who elect to \nreceive Phase-In Charges will do so based on the current delivery rates under Parent \nService Class Rate 280. \n \nSC-12 customers billed under Parent Service Classification SC-2 Small rates shall have \nthe determination of their Contract Demand (kW) and As Used Daily Demand (kW) based \non a 60-minute integrated metered demand, which shall be determined as the sum of the \nfour 15-minute intervals in an hour."},{"page":154,"startToken":31921,"endToken":32096,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264K \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service (continued): \n(Rate Codes:  179, 680, 682) \nRates and Charges (continued) \n \nc) Rate Code B2682: Parent Service Classification No. 2-L – General Service - Large \n \nMONTHLY RATE:  \n \n \n \nService Charge Per Day:  \n \n \n$2.92     \n  \n \nContract Demand Charges per kW: \nDelivery for SC-12 Customers \n \n \n$0.19 \n \n \nAs Used Off-Peak Daily Demand Charges per kW: \nDelivery for SC-12 Customers    \n \n$0.81 \n \n \n \nAs Used Peak Daily Demand Charges per kW:  \nDelivery for SC-12 Customers    \n \n$1.20 \n \n \nRate Code P2682: Phase-In Charges for Parent SC 2-L  \n \nDelivery Charges will be calculated as identified in SC-12.14.g. Customer who elect to \nreceive Phase-In Charges will do so based on the current delivery rates under Parent \nService Class Rate 281. \n \nSC-12 customers billed under Parent Service Classification No. SC 2-L rates shall have \nthe determination of their Contract Demand (kW) and As Used Daily Demand (kW) based \non a 15-minute integrated metered demand."},{"page":155,"startToken":32096,"endToken":32311,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264L \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service (continued): \n(Rate Codes:  179, 680, 682) \nRates and Charges (continued) \n \nd) Rate Code B3682/B4682: Parent Service Classification No. 2 – MRP – Large \nGeneral and Industrial Service With Multiple Rate Periods (Secondary and Primary) \n \nMONTHLY RATES:  \n \n \n \n \n(B4682)  \n(B3682) \nDelivery Voltage \n \n \n \n \nSecondary  \nPrimary \n \nService Charge Per Day:  \n \n \n \n$3.83     \n$5.20  \n \nContract Demand Charges per kW: \nDelivery for SC-12 Customers \n \n \n \n$0.11 \n \n$0.06 \n \nAs Used Off-Peak Daily Demand Charges per kW: \nDelivery for SC-12 Customers    \n \n \n$0.95 \n \n$0.83 \n \nAs Used Peak Daily Demand Charges per kW:  \nDelivery for SC-12 Customers    \n \n \n$1.30 \n  \n$1.21 \n \n \nRate Code P3682/P4682: Phase-In Charges for Parent SC 2-MRP (Secondary & \nPrimary) \n \nDelivery Charges will be calculated as identified in SC-12.14.g. Customer who elect to \nreceive Phase-In Charges will do so based on the current delivery rates under Parent \nService Class Rate 285 Secondary or Rate 285 Primary depending on voltage level they \nare interconnected. \n \nSC-12 customers billed under Parent Service Classification No. SC 2-MRP rates shall \nhave the determination of their Contract Demand (kW) and As Used Daily Demand (kW) \nbased on a 15-minute integrated metered demand."},{"page":156,"startToken":32311,"endToken":32610,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264M \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service (continued): \n(Rate Codes:  179, 680, 682) \nRates and Charges (continued) \n \ne) Rate Code B5682: Parent Service Classification No. 2 – MRP – Large General and \nIndustrial Service With Multiple Rate Periods (Transmission) \n \nMONTHLY RATES:  \n \nDelivery Voltage \n \n \n \n \nTransmission \n \nService Charge Per Day:  \n \n \n \n$5.20     \n  \n \nContract Demand Charges per kW: \nDelivery for SC-12 Customers \n \n \n \n$0.05 \n \n \nAs Used Off-Peak Daily Demand Charges per kW: \nDelivery for SC-12 Customers    \n \n \n$0.69 \n \n \nAs Used Peak Daily Demand Charges per kW:  \nDelivery for SC-12 Customers    \n \n \n$1.17 \n \n \n \nRate Code P5682: Phase-In Charges for Parent SC 2-MRP (Transmission) \n \nDelivery Charges will be calculated as identified in SC-12.14.g. Customer who elect to \nreceive Phase-In Charges will do so based on the current delivery rates under Parent \nService Class Rate 285 Transmission. \n \ne) Rate Code P6682: Phase-In Charges for Customers Previously on Closed Rate 681 \n(Transmission)  \n \nDelivery Charges will be calculated as identified in SC-12.14.g. Customers who elect to \nreceive Phase-In Charges will do so based on the current delivery rates under Parent \nService Class Rate 285 Transmission but will have zero demand charges and energy \ncharges identified for Previously Closed Rate 681 as updated on a pro-rata percentage \nbasis with Rate 285 Transmission. \n \nPreviously Closed Rate 681 Periods* \n \n1 \n2 \n3 \n \nMidnight  \nJune - Sept., \nAll remaining \n \nto 7 a.m. \nexcept Sunday, \nhours \n \nall year \n10 a.m. to 10 p.m. \n \nTransmission \n$ 0.0001 \n$ 0.2850 \n$ 0.0364 \n \nSC-12 customers billed under Parent Service Classification No. SC 2-MRP \n(Transmission) rates shall have the determination of their Contract Demand (kW) and As \nUsed Daily Demand (kW) based on a 15-minute integrated metered demand."},{"page":157,"startToken":32610,"endToken":32918,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264N \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service (continued): \n(Rate Codes:  179, 680, 682) \n \n8. Adjustments to Rates and Charges \n \nEach Customer’s bill will be adjusted for the Power Supply Charge, Increases in Rates and \nCharges to Recover PILOT Payments, the Shoreham Property Tax Settlement Rider, the \nDistributed Energy Resources Cost Recovery Rate, the Merchant Function Charge, the New \nYork State Assessment Factor, the Securitization Offset Charge, and the Delivery Service \nAdjustment.  \n \nEach Customer that qualifies for Rate 285-Primary or Rate 285-Transmission will not be \nbilled the Power Supply Charge. Such customers will be billed Hourly Market Power Supply \ncharges based on the NYISO Day ahead market: Average Monthly Energy Component \n(based on published day ahead NYISO Hourly Zone K LBMP energy prices); plus  \n \nCapacity Charges based on customer’s individually assigned capacity tag (kW) times the \nNYISO Zone K Monthly Capacity Market Price; plus  \n \nThe monthly local power supply charge. \n \n9. Terms of Payment  \n \nThe Customer shall pay the balance due in cash, including checks and money orders, on \nreceiving the bill. Late payments shall be subject to Late Payment Charges.  \n \n10. Term of Service  \n \na) The Authority will provide service to the Customer for at least one (1) year and until the \nservice is terminated by the Customer or the Authority.  \n \nb) The Customer shall give the Authority thirty (30) days written notice when requesting \ntermination of service. \n \nc) The Authority may terminate service to the Customer in accordance with the provisions of \nthe Tariff, after giving the Customer thirty (30) days written notice.  \n \nd) The Authority may require the Customer to take service at rates effective for a longer \nterm because of the investment required or other unusual conditions related to the \nservice."},{"page":158,"startToken":32918,"endToken":33433,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264O \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service (continued): \n(Rate Codes:  179, 680, 682) \n \n11 Determination of Contract Demand  \n \na) Contract Demand for Standby Service Customers  \n \nContract Demand shall initially be set at the maximum anticipated demand of the \ncustomer including any load that is not isolated referenced in the Standby Service \nApplication and determined as the greater of the following and the Authority shall inform \nthe customer of the resultant contract demand ten (10) days prior to the next billing cycle: \n \n(1) the maximum demand from the Authority's system over the previous 12-months, or \n(2) the customer's maximum load supplied by all sources including the OSG and \nAuthority's supply system over the previous 12-months. \n \nIn the case of a new customer (i.e., a customer for whom historical consumption data \ndoes not exist), the Contract Demand shall be the maximum anticipated demand of load \nconsumed as prescribed in the customer’s load letter.   \n \nThe Contract Demand shall automatically be increased to the highest measured demand \nin any billing period during the term hereunder.    \n \nThe Contract Demand of a Generator who is connected to a customer which would \notherwise be served directly by the Authority shall be set at the maximum potential \ndemand of the station power of the Generator when the generator is out of service plus \nthe maximum potential demand of the customer. \n \nThe Contract Demand may be increased based upon a written notice by the customer to \nthe Authority at any time. \n \nThe Contract Demand as determined above may be reduced based upon a written \nrequest by the customer to the Authority. Contract Demand requests may be made no \nmore than one time in a 365-day period and/or 365 days from any increase or ratchet in \nContract Demand. In the event the customer’s Contract Demand request is accepted by \nthe Authority and the Contract Demand is reduced; if thereafter the recorded maximum \ndemand at any time exceeds the customer's requested Contract Demand: (i) by 20% or \ngreater than a penalty equal to the product of 24 times the Contract Demand rate times \nthe demand in excess of the Contract Demand shall apply, (ii) by 10% or greater, but less \nthan 20%, then a penalty equal to the product of 18 times the Contract Demand rate \ntimes the demand in excess of the Contract Demand shall apply, (iii) by less than 10% \nthen a penalty equal to the product of 12 times the Contract Demand rate times the \ndemand in excess of the Contract Demand shall apply.  \n \nSeasonal or other temporary fluctuations in load of the customer's existing facilities such \nas heating and air conditioning, and temporary reductions in manufacturing shall not \nqualify for reductions in the Contract Demand. \n \nThe effective date of the revised Contract Demand shall be the next billing cycle following \nthe Authority's receipt of the customer's written notice provided such notice is received 10 \nbusiness days prior to the first day of the next billing cycle."},{"page":159,"startToken":33433,"endToken":33826,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264P \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service (continued): \n(Rate Codes:  179, 680, 682) \nDetermination of Contract Demand (continued) \n \n \nb) Contract Demand for Optional Rate Customers  \n \nContract Demand will be established initially as the customer’s maximum measured \ndemand during the first billing period. Thereafter, the Contract Demand shall \nautomatically be increased to the highest measured demand in any billing period during \nthe term hereunder. In the event the customer has installed energy efficient equipment or \nhas altered the operation of their service such that the maximum potential demand at the \npremise is less than the Contract Demand, the customer may request a reconsideration \nof the Contract Demand by the Authority. Any reduction of the Contract Demand will be at \nthe Authority’s discretion.  \n \nc) As Used Off-Peak Daily Demand  \n \nThe As-Used Off-peak Daily Demand shall be the aggregate of the highest daily 15-\nminute integrated demand (measured in kW) occurring during the off-peak hours of each \nday during the billing period, except for customers of parent service classification is SC-1 \nor SC-2 Small non-demand it shall be the aggregate of the highest 60-minute integrated \ndemand (measured in kW) during the off-peak hours of each day during the billing period. \n \nOff-Peak hours are defined as follows: During the months of October through May, for the \nhours between 8:00 am and 10:00 pm, daily. During the months of June through \nSeptember, for the hours between 8:00 am and 3:00 pm and 7:00 pm through 10:00 pm, \nMondays through Fridays, and 8:00 am through 10:00 pm, Saturdays, Sundays and \nFederal Holidays.  \n \nd) As Used Peak Daily Demand  \n \nThe As-Used Peak Daily Demand shall be the aggregate of the highest daily 15-minute \nintegrated demand (measured in kW) occurring during the peak hours of each day during \nthe billing period, except for customers of parent service classification is SC-1 or SC-2 \nSmall non-demand it shall be the aggregate of the highest 60-minute integrated demand \n(measured in kW) during the peak hours of each day during the billing period.  \n \nPeak hours are defined as follows: During the months of June through September, for the \nhours between 3:00 pm and 7:00 pm, Mondays through Fridays, excluding Federal \nHolidays."},{"page":160,"startToken":33826,"endToken":34111,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264Q \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service (continued): \n(Rate Codes:  179, 680, 682) \n12. Interconnection Requirements \n \na) The Authority may disconnect a Customer from the system if the Customer operates a \ngenerator in parallel with the Authority’s system without an Interconnection Agreement \n(IA) with the Authority. \n  \nb) The Customer must sign an IA within ninety (90) days of written notice, including a draft \nIA, from the Authority, unless \n \nc) The Customer has filed a complaint following the Consumer Complaint Procedures in \nSection VI of the Tariff. In this case, the Customer will not be disconnected until the \ncomplaint is resolved, unless the parallel generation creates a hazardous condition or \nthreatens the integrity of the system.  \n \nd) The facility may be connected for parallel operation with the service of the Authority, or \nisolated for operation with Standby Service provided by a Wholesale Generator by means \nof a double throw transfer switch or transfer switching scheme acceptable to the \nAuthority. \n \ne) Customers with an OSG and connected for parallel operation with the service of the \nAuthority are required to execute an IA with the Authority.  Customers having an OSG in \naggregate with other OSGs of less than 10 MW are eligible to apply the service using the \nSGIP. Customers without an OSG are not required to execute an IA with the Authority. \nAll other customers must execute an Interconnection Agreement, available from Authority \nrepresentatives. \n \n13. Metering and Communications \n \nInterval Metering  \n \nStandby Service Customers and Optional Rate Customers must have interval metering \n(AMI or MV90) and may not opt out of AMI interval meters."},{"page":161,"startToken":34111,"endToken":34524,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264R \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service (continued): \n(Rate Codes:  179, 680, 682) \n \n \n14. Special Provisions \n \na) Contract Demands Larger than 1,000 kW \n \nAll Standby Service Customers with Contract Demands greater than 1,000 kW applying \nfor Service under this Service Classification are required to provide the Authority with an \nannual schedule of OSG maintenance by October of the preceding year for each \nsubsequent year. This schedule will be provided at the time of subscription to this Service \nClassification and will be utilized for planning functions. Schedules must include starting \nand ending times for all planned outages. Customers will be allowed to update their \nschedules one month prior to their effective dates. After this time has passed, no \nmodifications will be allowed to the schedules, unless Authority approval is granted. This \nprovision does not take precedence with respect to any OSG maintenance provision in a \npower purchase agreement which may be in place with the Authority. \n \nb) Compliance with Reliability Criteria \n \nStandby Service Customers agree to comply with any existing or future criteria, \nguidelines, and procedures established by the North American Electric Reliability Council \n(or its successor) to ensure the continued reliability of North America's interconnected \nsecured transmission electric systems. \n \nc) Electrically Isolated Loads \n \n(1) The Customer’s non-Authority supply may be isolated from the Authority’s service by \na double throw switch, or  \n \n(2) Connected with the Authority’s service for parallel operation. In this case, the \nAuthority will provide suitable metering and charge the Customer for any additional \nmetering costs. \n \n(3) The Customer may choose to have the Authority use its estimating procedure to \ndetermine the separation of energy and demand between the Standby Service.  \n  \n(4) A Customer which is a Qualifying Facility under Part 292 of Title 18 of the Code of \nFederal Regulations or eligible for Net Metering under PSL 66-j or 66-l may choose, \nonce in every 12-month period, to make its purchases of energy and demand for \nStandby Service at rates either:  \n(i) Under this Service Classification, or \n(ii) Under a suitable firm Service Classification.  In this case, the Customer will \ncomply with the terms of this Service Classification, including the Interconnection \nCharge provision, that are in addition to and do not conflict with the requirements \nof the suitable firm Service Classification.  \n \n(5) Submetering may be available under certain conditions, as specified in the Tariff."},{"page":162,"startToken":34524,"endToken":34789,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264S \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service (continued): \n(Rate Codes:  179, 680, 682) \nSpecial Provisions (continued) \n \n \nd) Penalties for Reconnecting Isolated Loads without Notice \n \nNotwithstanding any other provision of the Tariff, in the event that the customer connects \non-site generation to its electric system without: (1) notifying the Authority; and (2) \nexecuting the Application for Electric Standby Service, and in the event that the Authority \nthereafter discovers that fact, the Authority shall backbill the customer for all service \nrendered subsequent to the estimated installation of such on-site generation. \n \nIn preparing such backbill, the Authority shall assess a Contract Demand Penalty \nProvision equal to 2 times that which would otherwise be computed under Determination \nof Demand Provision of SC-12 and assume the Contract Demand had been set at 0 kW. \nIf the customer fails to pay the undisputed portion of any such backbill within the time for \npayment of bills established in SC-12, the Authority shall be authorized to exercise all of \nits rights in cases involving theft of service under this Tariff. \n \ne) Billing for Customers with OSGs Less than or Equal to Fifteen Percent (15%) of \nMaximum Potential Demand \n \nStandby Service Customers that install an OSG with a total nameplate rating that is \nfifteen percent (15%) or less of their maximum potential demand over the previous twelve \n(12) months shall be subject to the delivery charges of their otherwise applicable service \nclassification and shall not be subject to Standby Rates."},{"page":163,"startToken":34789,"endToken":35231,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264T \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service (continued): \n(Rate Codes:  179, 680, 682) \nSpecial Provisions (continued) \n \nf) \nBilling for Customers with Excelsior Jobs Program (“EJP”) Load Not Separately Metered \n \n(1) Only customers billed at commercial rates are eligible to participate in the EJP \nprogram. \n(2) Special Provision E of SC-12 shall not apply to customers with EJP load. \n(3) The customer’s EJP demand and energy available for the EJP discount in each \nbilling period shall be determined in accordance with Section VII.E.5.e for EJP. \nCustomer shall be subject to all rates and charges applicable to the Excelsior Jobs \nProgram as provided in Section VII.E.5.  \n(4) Customer shall be subject to all charges provided in SC-12. The billing determinants \nfor customers with EJP qualifying load shall be determined as provided herein. \n(i) Contract Demand: The Contract Demand shall initially be set by the Authority as \nthe maximum value of the Customer’s monthly base year contract load in \nkilowatts specified in the signed EJP contract between the Authority and the \nCustomer. The Contract Demand will be automatically increased to the maximum \nkilowatt demand in a billing period when the maximum kilowatt demand in the \nbilling period exceeds the Contract Demand in that billing period. The maximum \nkilowatt demand in a billing period shall be calculated by subtracting the EJP \nincremental demand available for the EJP discount as determined for EJP from \nthe metered billing demand (i.e., customer’s load net of generation) on an \ninterval-by-interval basis. The demand shall not be less than zero (0) in any \ninterval. The customer may elect to increase or reduce the Standby Contract \nDemand thereafter in accordance with the Determination of Contract Demand \nprovisions of SC-12. \n(ii) As-Used Daily Demand: The As-Used Daily Demand shall be the As-Used Daily \nDemand as specified in Determination of As-Used Daily Demand provisions of \nthis SC for both As-Used On-peak Daily Demand and As Used Super-peak Daily \nDemand, less the product of the demand eligible for the EJP discount in the \nbilling period and the number of on-peak or off-peak days in the billing period, as \napplicable. \n(iii) Billing Energy: Billing Energy in kilowatt-hours for the purposes of applying the \nElectricity Supply Service and Surcharges and Adjustments provisions of SC-12 \nshall be calculated by subtracting the EJP incremental energy available for the \nEJP discounts from the metered billing energy (i.e., customer’s load net of \ngeneration) on an interval-by-interval basis. The Billing Energy shall not be less \nthan zero (0) in any interval."},{"page":164,"startToken":35231,"endToken":35616,"text":"Long Island Power Authority \n \n \n  Original Leaf No. 264U \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12  \nStandby Service and Optional Rate Service (continued): \n(Rate Codes:  179, 680, 682) \nSpecial Provisions (continued) \n \ng) SC-12 Phase-In Customers \n \nExisting customers prior to December 1, 2025 may elect to be billed the SC-12 Phase-In \nStandby Rate delivery charges beginning January 1, 2026 (“Phase-In Customers”).  \nPhase-In Customers may opt out of the Phase-In delivery charges at any time and be \nbilled SC-12 Standby Rate delivery charges by providing written notice to the Authority, \nwith such transition to SC-12 Standby Rate delivery charges occurring in the next billing \nperiod thirty days after notice is provided. Once a customer opts out of the SC-12 Phase-\nIn Standby Rate delivery charges, they may not return to as a Phase-In-Customer. So \nlong as the Phase-In is still in effect, the EAT exempt Customers may choose waive their \nEAT exemption and join the Phase-In Standby Rate already in progress. \n \nThe Phase-In period will be a fixed (i.e. will not vary by customer) time period that will \nbegin January 1, 2026 (Phase-In Year 1) until December 31, 2030, when the Phase-In \nPeriod will end for all customers. A Phase-In Year is defined as January 1st until \nDecember 31st.  \n \nDelivery Rates for a Phase-In Year will be calculated as the delta to a Customer’s Parent \nService Classification rate vs their applicable Standby Rate with the following formulas: \n \nPhase-In Year 1 (2026): Parent Service Class Delivery Rate Revenue + (Standby \nDelivery Rate Revenue –Parent Service Class Delivery Rate Revenue)/6 \n \nPhase-In Year 2 (2027): Parent Service Class Delivery Rate Revenue + (Standby \nDelivery Rate Revenue –Parent Service Class Delivery Rate Revenue)*2/6 \n \nPhase-In Year 3 (2028): Parent Service Class Delivery Rate Revenue + (Standby \nDelivery Rate Revenue –Parent Service Class Delivery Rate Revenue)*3/6 \n \nPhase-In Year 4 (2029): Parent Service Class Delivery Rate Revenue + (Standby \nDelivery Rate Revenue –Parent Service Class Delivery Rate Revenue)*4/6 \n \nPhase-In Year 5 (2030): Parent Service Class Delivery Rate Revenue + (Standby \nDelivery Rate Revenue –Parent Service Class Delivery Rate Revenue)*5/6 \n \nDelivery Rate Revenue includes Service Charge, Delivery Demand Charge and Delivery \nEnergy Charge revenues. All rate components identified in “Adjustments to Rates and \nCharges” will not be subject to the Phase-In."},{"page":165,"startToken":35616,"endToken":35643,"text":"Long Island Power Authority \n \n \nTwelfth Revised Leaf No. 265 \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12 \n \n[CANCELLED]"},{"page":166,"startToken":35643,"endToken":35670,"text":"Long Island Power Authority \n \n \nSeventh Revised Leaf No. 266 \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12 \n \n[CANCELLED]"},{"page":167,"startToken":35670,"endToken":35697,"text":"Long Island Power Authority \n \n \nThird Revised Leaf No. 267 \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12 \n \n[CANCELLED]"},{"page":168,"startToken":35697,"endToken":35724,"text":"Long Island Power Authority \n \n \nFourth Revised Leaf No. 268 \n \nEffective: January 1, 2026 \n \nTariff For Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12 \n \n[CANCELLED]"},{"page":169,"startToken":35724,"endToken":35751,"text":"Long Island Power Authority \n \n \nFourth Revised Leaf No. 269 \n \nEffective: January 1, 2026 \n \nTariff for Electric Service \n \nVIII. SERVICE CLASSIFICATIONS (continued): \n \nP. SERVICE CLASSIFICATION NO. 12 \n \n[CANCELLED]"},{"page":170,"startToken":35751,"endToken":35771,"text":"Niagara Mohawk \nService Classification 3A: Standard Large General \nService (or SC4 at the SC3A parent service class rates, \nif applicable)"},{"page":171,"startToken":35771,"endToken":36288,"text":"Issued by Sally Librera, President, Syracuse, NY \n \nPSC NO:  220 ELECTRICITY \nLEAF: 390 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 1 \nINITIAL EFFECTIVE DATE: FEBRUARY 1, 2026 \nSUPERSEDING REVISION: 0 \nSTAMPS: Issued in Compliance with Order in Case 15-E-0751, dated July 18, 2025. \n \nSERVICE CLASSIFICATION NO. 3A \n \nLARGE GENERAL SERVICE - TIME OF USE RATE \n \nAPPLICABLE TO USE OF SERVICE FOR: \n \nService shall be available throughout the Company's service area from existing circuits of adequate capacity and \nappropriate character.  Service shall be provided for all purposes required by a customer on the premises, inclusive of \nretail transmission, distribution and Electric Service, where such entire requirements are delivered at one Retail \nDelivery Point and singly metered with respect to the delivery voltage, and according to the following requirements \nbelow: \n \nFOR CUSTOMERS SERVED UNDER SC-3A BEFORE SEPTEMBER 1, 1998 \n \nWhen the monthly demand has exceeded 2,000 kW in any two consecutive months of the previous twelve months, or \nwhenever in the Company's opinion the applicant's demand will exceed 2,000 kW in any two consecutive months.  A \ncustomer once served under this service classification shall remain on this service classification until the monthly \nmeasured demand has been 1,500 kW or less for twelve consecutive months following the initial Term of Service, \nwhereupon service may be taken under another appropriate service classification. \n \nFor customers receiving Buyback Service from the Company under SC-6, the customer’s Service Demand kW as \nspecified in SC-6 Sections 1.4 and 2.4, as applicable, shall be used in lieu of the monthly measured demand specified \nabove when determining applicability of this SC-3A.  \n \nFOR CUSTOMERS SERVED UNDER SC-3A AFTER SEPTEMBER 1, 1998 \n \nWhen the monthly measured demand has exceeded 2,000 kW in any six consecutive months of the previous twelve \nmonths, or whenever in the Company's opinion the applicant's demand will exceed 2,000 kW in any six consecutive \nmonths.  A customer once served under this service classification shall remain on this service classification until the \nmonthly measured demand has been 1,800 kW or less for six consecutive months following the initial Term of Service, \nwhereupon service shall be taken under the otherwise applicable service classification. \n \nFor customers receiving Buyback Service from the Company under SC-6, the customer’s Service Demand kW as \nspecified in SC-6 Sections 1.4 and 2.4, as applicable, shall be used in lieu of the monthly measured demand specified \nabove when determining applicability of this SC-3A. \n \nAPPLICATION FOR SERVICE: \n \nThe Company may require the customer to submit a written application for service on the Company's prescribed Form \nC, with all applicable riders attached, however, the customer's failure to submit a Form C application does not exempt \nthe Customer from paying all rates and charges, and terms and conditions provided herein.  When accepted by the \nCompany, such application shall constitute an agreement for the provision of service hereunder. \n \nCHARACTER OF SERVICE: \n \nContinuous.  Single or three phase alternating current, approximately 60 Hz, at one standard secondary voltage, or a \nprimary distribution voltage or a transmission voltage. Company will indicate the voltage and type of service available \nand appropriate for the customer's requirements."},{"page":172,"startToken":36288,"endToken":36506,"text":"Issued by Sally Librera, President, Syracuse, NY \n \nPSC NO: 220 ELECTRICITY \nLEAF: 391 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 27 \nINITIAL EFFECTIVE DATE: APRIL 1, 2026 \nSUPERSEDING REVISION: 26 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025. \n \nSERVICE CLASSIFICATION NO. 3A (Continued) \n \nMaximum demand shall be determined as the highest demand measured in the billing period. In the event the billing \nperiod consists of less than 27 days or more than 35 days, the maximum demand shall be prorated on the basis of the \nnumber of elapsed days divided by 30.  \n \nRATE PERIODS \n \nOn-peak hours are defined as the hours between 8:00 a.m. and 10:00 p.m., Monday through Friday, except for the \nfollowing holidays when such holiday falls on other than a Saturday or a Sunday; New Year’s Day Memorial Day, \nIndependence Day, Labor Day, Thanksgiving Day and Christmas Day. \n \nAll other hours are defined as off-peak. \n \nCHARGES: \n \n \n \n \n \nDelivery Voltage \n \nUp to 2.2 kV \n2.2-15 kV \n22-50 kV \nOver 60 kV \nCustomer Charges: \n  Distribution Delivery \n$4,150.00 \n$4,150.00 \n$5,100.00 \n$10,350.00 \n \nPlus Demand Charges: \n \nDistribution Delivery  \n \nCharges; per kW: \n$15.58 \n$15.58 \n$5.42 \n$4.89 \n \nPLUS REACTIVE DEMAND CHARGES: \n \nAll Delivery Voltages: \n$1.02 Per kilovolt-ampere of lagging Reactive Demand"},{"page":173,"startToken":36506,"endToken":36723,"text":"Issued by Sally Librera, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 392 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 26 \nINITIAL EFFECTIVE DATE: MARCH 1, 2026 \nSUPERSEDING REVISION: 25 \nSTAMPS: Issued in Compliance with Order in Cases 14-M-0094, 18-M-0084, 25-M-0248, and 25-M-0249, dated \nNovember 14, 2025. \n \nSERVICE CLASSIFICATION NO.  3A (Continued) \n \nCompany Supplied Electricity Supply Service Charges: Company supplied Electricity Supply Service Charges shall \nbe set on an hourly basis according to the market price of electricity determined in accordance with Rule 46.1, \nElectricity Supply Cost. \n \n \nADJUSTMENTS TO STANDARD RATES AND CHARGES: \n \nCustomers served under this service classification may be subject to adjustments and applied in the manner \ndescribed in each respective Rule. \n \nRule 32.2 - Municipal Undergrounding Surcharge \nRule 40.3 - Value of Distributed Energy Resource (VDER) Value Stack Cost Recovery Surcharge \nRule 41 - System Benefits Charges \nRule 42 - Merchant Function Charge \nRule 43 - Transmission Revenue Adjustment \nRule 45 - Non-Wires Alternative Surcharge \nRule 46 - Supply Service Charges \nRule 49 - Earnings Adjustment Mechanism \nRule 50 - Reliability Support Services Surcharge \nRule 52 - Electric Vehicle Make-Ready Surcharge \nRule 56 - Energy Storage Surcharge \nRule 57 - Revenue Decoupling Mechanism \nRule 59 - Arrears Management Program Recovery (AMP) Surcharge \nRule 64 - Dynamic Load Management (DLM) Surcharge \nRule 67 - Rate Adjustment Mechanism (RAM)  \nRule 68 - Other Delivery Surcharges (ODS) \nRule 73 - Proactive Planning Surcharge"},{"page":174,"startToken":36723,"endToken":36901,"text":"Issued by Kenneth D. Daly, President, Syracuse, NY \n \nPSC NO:  220 ELECTRICITY \nLEAF: 393 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 3 \nINITIAL EFFECTIVE DATE: APRIL 15, 2016 \nSUPERSEDING REVISION: 2 \n \n \nSERVICE CLASSIFICATION NO. 3A (Continued) \n \nINCREASE IN RATES AND CHARGES: \n \nThe rates and charges under this service classification, including System Benefits Charge, will be increased by a tax \nfactor pursuant to Rule 32. \n \nDETERMINATION OF DEMAND: \n \nDistribution Delivery Charges:  \n \n \nDelivery voltage below 22 kV: \n \nThe Distribution Delivery Charges, for delivery voltage up to 2.2 kV and 2.2-15 kV, shall be determined \nutilizing the highest demand measured over any fifteen minute interval during the month, but not less than \none-half of the highest such demand occurring during any of the preceding eleven months, nor less than the \ndemand contracted for in Form C. \n \n \nDelivery voltage above 22 kV \n \nThe Distribution Delivery Charges for delivery voltage 22-50 kV and over 60 kV, shall be determined \nutilizing the highest demand measured over any fifteen minute interval during the month, but not less than \nthe demand contracted for in Form C."},{"page":175,"startToken":36901,"endToken":37170,"text":"Issued by Thomas B. King, President, Syracuse, NY \n \nPSC NO:  220 ELECTRICITY \nLEAF: 394 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 1 \nINITIAL EFFECTIVE DATE: JANUARY 1, 2012 \nSUPERSEDING REVISION: 0 \n \n \nSERVICE CLASSIFICATION NO. 3A (Continued) \n \nCUSTOMERS PREVIOUSLY SERVED UNDER SERVICE CLASSIFICATION NO.  3 \n \nFor customers served under Service Classification No. 3 in the twelve months prior to September 1, 1998, the initial \ndemand contracted for in Form C under this service classification for  Distribution Delivery Charges  shall be no less \nthan the lesser of one-half of the highest demand measured over a fifteen minute interval during any of the most recent \ntwelve months or 1800 kW. \n \nReactive Demand: \n \nThe Reactive Demand shall be the highest average RkVA of lagging reactive demand measured over a fifteen minute \ninterval during the month less one-third of the highest kW demand measured during the month. \n \nUnless otherwise specified in this Special Provision, all other terms, conditions and surcharges as set forth in this \nService Classification shall apply. \n \nBILLING PERIOD: \n \nThe rates and charges contained in this service classification are based upon a monthly billing period.  A monthly \nbilling period is defined as any period consisting of not less than 25 days and not more than 35 days.  Bills for shorter \nor longer periods than defined herein shall be prorated on the basis of the number of elapsed days divided by 30. \n \nTERMS OF PAYMENT: \n \nBills are due and payable when rendered.  Full payment must be received on or before the date shown on the bill to \navoid a late payment charge of one and one-half percent (1 1/2%) pursuant to Rule 26.4."},{"page":176,"startToken":37170,"endToken":37540,"text":"Issued by Rudolph L. Wynter, President, Syracuse, NY \n \nPSC NO:  220 ELECTRICITY \nLEAF: 395 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 6 \nINITIAL EFFECTIVE DATE: AUGUST 1, 2021 \nSUPERSEDING REVISION: 5 \nSTAMPS: Issued in Compliance with Order issued July 19, 2021 in Case 21-E-0084 \n \n \nSERVICE CLASSIFICATION NO.  3A (Continued) \n \nTERM: \n \nExcept as otherwise provided herein, the Term under this service classification shall be one year from commencement \nof service and continuously thereafter until permanently canceled by customer upon ninety days' prior written notice to \nthe Company.  Cancellation by customer followed by resumption of service at the same location within one year shall \nnot modify in any way the Determination of Demand as above provided. When the amount of an investment by the \nCompany or other conditions of the service are such as to warrant, the Company may, with the permission of Public \nService Commission, require that the initial term be longer than one year and for successive one year terms thereafter \nuntil canceled effective at the expiration of the initial Term, or of any succeeding one year Term, by customer giving \nninety days' prior written notice to Company. \nSPECIAL PROVISIONS: \n \nA.   \nCombined Metering and Billing: When the Company, pursuant to Rule 25.1.4.3, has provided Electric \nService at the customer's single location through more than one Retail Delivery Point, the quantities derived \nfrom all necessary meters will be combined for billing purposes in accordance with the provisions of such rule \nupon the execution of the rider for Combined Metering and Billing attached to Form C. \n \nB.   \nMetering Voltage:  When a customer provides the high voltage equipment to accept a service voltage higher \nthan 2,200 volts, the Electric Service voltage will be the Company's incoming line voltage.  When the \nCompany provides all or part of the high voltage equipment, the service voltage will be the secondary voltage \nof the Company's transformers.  When service is metered at a voltage either higher or lower than the voltage \nof delivery, metered quantities will be adjusted for billing as provided in Rule 25.4. \n \nC.   \nRiders:  Service taken under this service classification may be eligible for a limited-duration bill reduction \ntreatment as described in Rule 34, Economic Development Programs. \n \nD. \nRESERVED FOR FUTURE USE"},{"page":177,"startToken":37540,"endToken":38052,"text":"Issued by Rudolph L. Wynter, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 396 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 2 \nINITIAL EFFECTIVE DATE: MARCH 1, 2024 \nSUPERSEDING REVISION: 1 \n \nSERVICE CLASSIFICATION NO.  3A (Continued) \n \nSPECIAL PROVISIONS (Continued) \n \n \nE. \n On-Site Generation Special Provision - Customers are obligated to certify, subject to the Company’s \napproval, on-site generation (OSG) installations on the Company’s Form G, Application for Electric \nStandby Service, and will be subject to the provisions of Service Classification No. 7 unless the customer \nhas electrically isolated a portion of their load as defined in Rule 1.48 or has installed the OSG to be used \nexclusively as an Emergency Power System as defined in Rule 1.50. \n \n \n \nF.  \nRetail Access: Customers served in this Rate Classification are eligible to participate in the Retail Access \nProgram in accordance with Rule 39, Retail Access Program. \n \nG.   \nFor customers who operate a generator in excess of 25 MVa or greater and install automatic voltage control \n(AVC) at their facilities, reactive demand charges shall be waived, with the parameters defined by the \nCompany during the period in which such AVC is operating and maintained in good working order.  The \nCompany will not waive start-up reactive demand charges. The initial parameters will be determined by the \nCompany and may be changed subject to system conditions and location of the generating unit.  The waiver is \nsubject to the Company's rights to review and approve the customer's AVC system and review its operation \nand performance for compliance with the system requirements. \n \nH. \nNet Energy Billing for Certain Customers Operating Solar or Farm Waste Electric Generating \nEquipment- Customers who own or operate Solar Electric Generating Equipment located and used at its \npremises or Farm Waste Electric Generating Equipment located and used at the customer’s ‘Farm Operation”, \nas defined in Subdivision 11 of Section 301 of the Agriculture and Markets Law, may deliver electricity to the \nCompany generated by the solar or farm waste electric generating system and the Company shall offset such \nelectricity received from the customer against electricity supplied by the Company to the customer at other \ntimes pursuant to Rule No. 36 of this Tariff. \n \n \nQualifying demand customers will continue to pay applicable actual demand charges consumed in that \nbilling period.  However, the Company will not adjust this demand charge to reflect demand ratchets or \nmonthly demand minimums that might be applied to a standard tariff.   \n \nI. \nNet Energy Billing for Certain Customers Operating Solar or Farm Service Electric Generating \nEquipment - Residential, farm service, and non-residential customers, who own or operate Wind Electric \nGenerating Equipment may deliver electricity to the Company generated by the wind electric generating \nsystem and the Company shall offset such electricity received from the customer against electricity supplied \nby the Company to the customer at other times pursuant to Rule No. 37 of this Tariff.  \n \n \nQualifying demand customers will continue to pay applicable actual demand charges consumed in that billing \nperiod.  However, the Company will not adjust this demand charge to reflect demand ratchets or monthly \ndemand minimums that might be applied to a standard tariff."},{"page":178,"startToken":38052,"endToken":38450,"text":"Issued by John Bruckner, President, Syracuse, NY \n \nPSC NO:  220 ELECTRICITY \nLEAF: 399 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 8 \nINITIAL EFFECTIVE DATE: JANUARY 1, 2021 \nSUPERSEDING REVISION: 7 \nSTAMPS: \n \nSERVICE CLASSIFICATION NO. 4 \nUNTRANSFORMED SERVICE TO CERTAIN CUSTOMERS TAKING POWER FROM \nPROJECTS OF THE NEW YORK POWER AUTHORITY \n \nAPPLICABLE TO USE OF SERVICE FOR: \n \nThe supply by the Company of: \n \n(1)  \ntransmission, distribution and delivery by the Company of Replacement Power and Expansion Power \n(collectively referred to herein as “Niagara Power”) produced by the New York Power Authority’s \n(“NYPA”) Niagara Project under the provisions of the Settlement Agreement dated April 21, 2004 and \napproved by the Federal Energy Regulatory Commission by order dated July 9, 2004 in Docket No. \nER03-989-000 (“Niagara Power Delivery Service”); and \n \n(2) \ntransmission, distribution and delivery by the Company of High Load Factor (“HLF”) Power provided by \nNYPA from Authority Sources (as defined in section 1005 of the Public Authorities Law under the \nprovisions of the Settlement Agreement between the Company, NYPA and the New York State \nDepartment of Public Service dated May 27, 1997 and approved by the Commission in Orders dated May \n23, 1997, June 10, 1997 and August 20, 1997 in Cases 97-E-0528 and 97-E-0569 (“the May 22, 1997 \nSettlement”)(hereinafter referred to as “HLF Delivery Service”)); and \n \n(3) \ntransmission, distribution and delivery by the Company of that portion of the customer’s contract demand \nfor Preservation Power produced by NYPA’s  St. Lawrence Project  that is sold to such customer pursuant \nto the provisions of section 1005(13) of the Public Authorities Law (“Preservation Power Delivery \nService”); and \n \n(4) \nthe supplemental electric service requirements of an individual customer who has contracted to receive \n(A) Niagara Power Delivery Service; and/or (B) Preservation Power Delivery Service; and/or (C) HLF \nDelivery Service under this rate schedule SC-4 (hereinafter referred to as “SC-4 Supplemental Service”).   \n \nCustomers receiving any form of ESS from NYPA other than: \n \n(i) \nNiagara Power,  \n(ii) \nHLF Power,  \n(iii) \nPreservation Power eligible for delivery under subpart (3) above, \n(iv) \nRecharge New York (“RNY”) Power under Rule 34.6, and  \n(v) \nNYPA Supply Service under Rule 31 \n \n \nshall receive all of their commodity requirements under the retail access program rules set out in Rule 39 of this \nTariff at the delivery rates established therein.   \n \nService hereunder is available throughout the Company's service area from existing circuits of adequate capacity \nand appropriate character."},{"page":179,"startToken":38450,"endToken":38969,"text":"Issued by Kenneth D. Daly, President, Syracuse, NY \n \nPSC NO:  220 ELECTRICITY \nLEAF: 400 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 7 \nINITIAL EFFECTIVE DATE: APRIL 1, 2018 \nSUPERSEDING REVISION: 5 \nSTAMPS: Issued in Compliance with Order in Case 17-E-0238 Issued March 15, 2018. \n \n \nSERVICE CLASSIFICATION NO. 4 (Continued) \n \nThe Company may require the customer to apply for service under this rate schedule upon the Company’s \nprescribed written forms and to attach any applicable riders thereto. When accepted by the Company, such \napplication shall constitute an agreement for the supply of service hereunder, but the customer’s failure to submit \nsuch a written application shall not relieve it of the obligation to pay the rates and charges established herein for \nservice subject to the provisions of this rate schedule.  In no event shall a customer failing to execute a service \nagreement with the Company be eligible to participate in the Company’s Retail Access Program for the portion of \nthe load met by SC-4 Supplemental Service. \n \nCHARACTER OF SERVICE: \n \nContinuous. Three-phase alternating current, approximately 60 Hz. Company will determine the voltage available \nand appropriate for the customer’s total Electric Service requirements. \n \nPARENT SERVICE CLASSIFICATION RATES FOR SC-4 SUPPLEMENTAL SERVICE: \nCustomers receiving SC-4 Supplemental Service shall be assigned the following parent service classifications for \nsupplemental service provided under this Rate Schedule: \n \n1. \nCustomers Served Under SC-3A Before September 1, 1998 \n \n \nWhen the sum of the customer’s monthly demand for SC-4 Supplemental Service, and HLF \nDelivery Service, but excluding Niagara Power Delivery Service, has exceeded 2,000 kW in any \ntwo consecutive months of the previous twelve months, or whenever in the Company’s opinion \nthe applicant’s demand will exceed 2,000 kW in any two consecutive months.  Effective July 1, \n2013, billed demands for Niagara Power Delivery Service shall also be included in determining \nwhether the customer’s demands exceed 2,000 kW.  A customer once assigned under Service \nClassification No. 3-A and/or Parent Service Classification No. 3-A shall remain on this parent \nservice classification until the monthly measured demand has been 1,500 kW or less for twelve \nconsecutive months following the initial Term of Service. \n \n2. \nCustomers Served Under SC-3A After September 1, 1998 \n \n \nWhen the sum of the customer’s monthly demand for SC-4 Supplemental Service, and HLF \nDelivery Service, Preservation Power Delivery Service, but excluding Niagara Power Delivery \nService, has exceeded 2,000 kW in any six consecutive months of the previous twelve months, or \nwhenever in the Company’s opinion the applicant’s demand will exceed 2,000 kW in any six \nconsecutive months.  Effective July 1, 2013, billed demands for Niagara Power Delivery Service \nshall also be included in determining whether the customer’s demands exceed 2,000 kW.  A \ncustomer once assigned under Service Classification No. 3-A and/or Parent Service Classification \nNo. 3-A shall remain on this parent service classification until the monthly measured demand has \nbeen 1,800 kW or less for six consecutive months following the initial Term of Service. \n \n3. \nAll Other Customers \n \nAll customers receiving SC-4 Supplemental Service that do not qualify for Parent Service \nClassification No. 3-A will be assigned to Parent Service Classification No. 3."},{"page":180,"startToken":38969,"endToken":39570,"text":"Issued by Sally Librera, President, Syracuse, NY \n \n \nPSC NO: 220 ELECTRICITY \nLEAF: 401 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 10 \nINITIAL EFFECTIVE DATE: SEPTEMBER 1, 2025 \nSUPERSEDING REVISION: 8 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025. \n \nSERVICE CLASSIFICATION NO. 4 (Continued) \n \nIn either event, the rates, terms and conditions specified in the applicable parent service classification shall apply to SC-4 \nSupplemental Service, with the exception of supplemental service that is EJP qualifying load, is subject to the terms of the Special \nProvisions of this Rate Schedule S.C. No. 4. \n \nCALENDAR MONTH BILLING FOR NIAGARA POWER DELIVERY SERVICE, HLF DELIVERY SERVICE, \nPRESERVATION POWER DELIVERY SERVICE, AND SC-4 SUPPLEMENTAL SERVICE \n \nThe rates applicable to Niagara Power Delivery Service, HLF Delivery Service, Preservation Power Delivery Service, and SC-4 \nSupplemental Service shall be for a calendar month billing period.   \n \nDETERMINATION OF BILLING QUANTITIES \n \n1.  \nCompany will normally furnish and install meters at the customer’s expense to measure the total electric service taken by the \ncustomer, including SC-4 Supplemental Service, Niagara Power Delivery Service, Preservation Power Delivery Service and \nHLF Delivery Service. When the metering voltage is either higher or lower than the delivery voltage, such measurements shall \nbe conformed to the delivery voltage measurements as provided in Rule 25.4 of the General Information. \n \n2.  \nMetering facilities may be installed by NYPA instead of by the Company with the Company’s approval. In this case, the \nmetering equipment and installation must meet the specifications of both the Company and the New York State Public Service \nCommission and the customer shall be eligible for a metering credit pursuant to Rule 25.1.1.1. \n \n3.  \n Billing Quantities for deliveries of demand associated with Niagara Power Delivery Service for Expansion Power and \nReplacement Power Rate 1 and Replacement Power Rate 2 \n \nEffective until June 30, 2013, the customer’s billed demand for Niagara Power Delivery Service associated with Expansion, \nReplacement Power Rate 1 and Replacement Power Rate 2 shall be the kilowatts of such service which the customer is \nentitled to receive under its allocation agreement(s) with NYPA. Effective July 1, 2013, the customer’s billed demand for \nNiagara Power Delivery Service associated with Expansion Power and Replacement Power Rate 1 shall be the lesser of the \ncustomer’s contract demand for Niagara Power Delivery Service (adjusted for losses as provided in subparts (b) and 4(c) \nbelow) or the highest 30-minute integrated demand recorded on the customer’s meter for the current billing period, and the \ncustomer’s billed demand for Niagara Power Delivery Service associated with Replacement Power Rate 2 shall be the \nkilowatts of such service which the customer is entitled to receive under its allocation agreement(s) with NYPA (adjusted for \nlosses from the Niagara Switchyard to the customer’s meter as provided in sections 4(b) and 4(c) below). \n \n4. \n Billing Quantities for deliveries of energy associated with Niagara Power Delivery Service for Expansion Power and \nReplacement Power Rate 1  \n \n(a) \nEffective until June 30, 2013: The billed energy in each 30-minute billing interval for Niagara Power Delivery \nService for Expansion Power and for Replacement Power Rate 1 shall be the total number of kilowatt-hours recorded \non the customer’s meter for the billing period multiplied by the ratio of the customer’s demand for Expansion Power \nand Replacement Power Rate 1 (adjusted for losses as provided in subparts b and c below) to the greater of the \ncustomer’s loss-adjusted contract demand for Expansion Power and/or Replacement Power Rate 1 or the highest 30 \nminute integrated demand recorded on the customer’s meter in the twelve months ending with the current billing \nperiod."},{"page":181,"startToken":39570,"endToken":40100,"text":"Issued by Kenneth D. Daly, President, Syracuse, NY \n \nPSC NO:  220 ELECTRICITY \nLEAF: 402 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 5 \nINITIAL EFFECTIVE DATE: JANUARY 12, 2012 \nSUPERSEDING REVISION: 4 \nSTAMPS: Issued in Compliance with Order Issued December 16, 2011 in Case No. 10-E-0050 \n \n \n \nSERVICE CLASSIFICATION NO. 4 (Continued) \n \n \nEffective July 1, 2013: The billed energy in each 30-minute billing interval for Niagara Power Delivery \nService for Expansion Power and for Replacement Power Rate 1 shall be the total number of kilowatt-hours \nrecorded on the customer’s meter for the billing period multiplied by the ratio of the customer’s billed \ndemand for Expansion Power and Replacement Power Rate 1 to the greater of the customer’s billed demand \nfor Expansion Power and/or Replacement Power Rate 1 or the highest 30 minute integrated demand \nrecorded on the customer’s meter in the current billing period. \n \n \n(b) \nAdjustments for Losses In Transmission For Existing and Additional Allocations of Expansion Power and \nExisting Allocations of Replacement Power Rate 1. \n \n(i)  \nEffective until June 30, 2013:  \n \na. \nThe customer’s contract demand for Existing and Additional Allocations of Expansion \nPower and for Existing Allocations of Replacement Power Rate 1shall be adjusted for \nlosses from the Niagara Switchyard to the customer’s meter as provided for the \nallocation(s) in question in the Company’s Rate Schedule FERC Nos. 19 (for Replacement \nPower Rate 1) and 159 (for Expansion Power) prior to the performance of the calculations \nin subpart a above; and \nb. \nThe customer’s receipts of  Niagara Power Delivery Service associated with Existing and \nAdditional Allocations of Expansion Power and Existing Allocations of Replacement \nPower Rate 1 as determined in subpart a above shall be adjusted for losses from the \ncustomer’s meter to the Niagara Switchyard as provided for the allocation(s) in question in \nthe Company’s Rate Schedule FERC Nos. 19 (for Replacement Power Rate 1) and 159 (for \nExpansion Power) to produce the final billing demands and billing energy for such service. \n \n \n(ii) \nEffective July 1, 2013:  \n \na. \nThe customer’s contract demand for Existing and Additional Allocations of Expansion \nPower and Replacement Power Rate 1 shall be adjusted for losses from the Niagara \nSwitchyard to the customer’s meter as provided in Rule 39.18 of this Tariff prior to the \nperformance of the calculations in subpart a above; and \n \nb. \nThe customer’s metered receipts of electricity supplied in the form of Niagara Power \nDelivery service shall be adjusted for losses from the customer’s meter to the Niagara \nSwitchyard as provided in Rule 39.18 of this Tariff. \n \n(c)  \nAdjustments for Losses In Transmission For New Allocations of Expansion Power and Replacement  \n Power Rate 1. \n \n(i)  \nThe customer’s contract demand for New Allocations of Expansion Power and Replacement \nPower Rate 1 shall be adjusted for losses from the Niagara Switchyard to the customer’s meter as \nprovided in Rule 39.18 of this Tariff prior to the performance of the calculations in subpart a \nabove; and \n \n(ii) \nThe customer’s metered demands for Niagara Power Delivery Service associated with New \nAllocations of Expansion Power and Replacement Power Rate 1 shall be adjusted for losses from \nthe customer’s meter to the Niagara Switchyard as provided in Rule 39.18 of this Tariff."},{"page":182,"startToken":40100,"endToken":40628,"text":"Issued by John Bruckner, President, Syracuse, NY \n \nPSC NO: 220 ELECTRICITY \nLEAF: 403 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 4 \nINITIAL EFFECTIVE DATE: OCTOBER 1, 2020 \nSUPERSEDING REVISION: 3 \nSTAMPS: \n \n \n \nSERVICE CLASSIFICATION NO. 4 (Continued) \n \n5. \nBilling Quantities for deliveries of energy associated with Niagara Power Delivery Service for Replacement \nPower Rate 2 \n \na. \nThe kilowatt-hours charged will be the customer’s contract demand for Replacement Power Rate 2 \nmultiplied by the number of hours in the billing period. \n \nb. \nFor the purpose of determining the portion of the customer’s demands served by sources other than \nReplacement Power Rate 2: \n \n(i) \nEffective until June 30, 2013: The customer’s contract demand for Replacement Power Rate 2 \nshall be adjusted for losses from the Niagara Switchyard to the customer’s meter as provided in \nparagraphs 4(b)(i) (in the case of Existing Allocations) and 4(c)(i) (in the case of New \nAllocations) above; and \n \nEffective July 1, 2013: The customer’s metered demand for electricity supplied in the form of \nReplacement Power Rate 2 shall be subject to the adjustments for losses in transmission and \ndistribution between the customer’s meter and the Niagara Switchyard set out in Rule 39.18 of this \nTariff ; and  \n \n(ii) \nThe total kilowatt-hours of Replacement Power Rate 2 received by the customer in any interval \nshall be the lesser of the total kilowatt-hours of Replacement Power Rate 2 received by the \ncustomer during that interval, adjusted for losses in Transmission from the Niagara Switchyard to \nthe customer’s meter as described in paragraphs 4(b)(ii) (in the case of Existing Allocations) and \n4(c)(ii) (in the case of New Allocations) above; or the total kilowatt-hours received by the \ncustomer during that interval as measured by the customer’s meter. \n \n6. \nBilling Quantities for Preservation Power Delivery Service: \n \na. \nSubject to the provisions of subpart c below, the billed demand for Preservation Power Delivery Service \nshall be the product of the customer’s highest 30-minute integrated demand in the billing period recorded on \nthe customer’s meter multiplied by the ratio of the customer’s contract demand for its allocations of \nPreservation Power Delivery Service (adjusted for losses as provided in subparts c below) to the greater of \nthe customer’s contract demand for Preservation Power Delivery Service or the highest 30-minute integrated \ndemand recorded on the customer’s meter for the current billing period.  \n \nb. \nSubject to the provisions of subpart c below, the billed energy in each 30-minute billing interval for \nPreservation Power Delivery Service shall be the total number of kilowatt-hours recorded on the customer’s \nmeter for the billing period multiplied by the ratio of the customer’s loss-adjusted contract demand for \nPreservation Power Delivery Service (adjusted for losses as provided in subparts c and d below) to the \ngreater of the customer’s loss-adjusted contract demand for Preservation Power or the highest 30 minute \nintegrated demand recorded on the customer’s meter for the current billing period. \n \nc. \nAdjustments for Losses In Transmission For Preservation Power Delivery Service. \n \n(i) \nThe customer’s contract demand for Preservation Power Delivery Service shall be adjusted for \nlosses from the St. Lawrence Switchyard to the customer’s meter as provided in Rule 39.18 of this \nTariff; and"},{"page":183,"startToken":40628,"endToken":41294,"text":"Issued by Kenneth D. Daly, President, Syracuse, NY \n \nPSC NO:  220 ELECTRICITY \nLEAF: 404 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 6 \nINITIAL EFFECTIVE DATE: JULY 1, 2013 \nSUPERSEDING REVISION: 4 \n \n \nSERVICE CLASSIFICATION NO. 4 (Continued) \n \n (ii) \nThe customer’s metered demands for Preservation Power Delivery Service shall be adjusted for \nlosses from the customer’s meter to the St. Lawrence Switchyard as provided in Rule 39.18 of this \nTariff. \n \n7. \nBilling Quantities for HLF Delivery Service \n \na. \nEffective until June 30, 2013, the billed demand for HLF Delivery Service taken hereunder shall be the \nkilowatts of such service which the customer is entitled to receive under its allocation agreement(s) with \nNYPA. The metered demand for HLF Delivery Service taken hereunder shall be the product of the \ncustomer’s highest 30-minute integrated demand in the billing period recorded on the customer’s meter \nmultiplied by the ratio of the customer’s contract demand for HLF Delivery Service to the greater of the \ncustomer’s contract demand for HLF Delivery Service or the highest 30-minute integrated demand recorded \non the customer’s meter for the twelve months ending with the current billing period.   \n \n \nEffective July 1, 2013, the customer’s billed demand for HLF Delivery Service shall be the product of the \ncustomer’s highest 30-minute integrated demand in the billing period recorded on the customer’s meter \nmultiplied by the ratio of the customer’s contract demand, adjusted for losses as provided in Sub Part (c) \nbelow, for HLF Delivery service to the greater of the customer’s contract demand for HLF Delivery Service \nor the highest 30-minute integrated demand recorded on the customer’s meter in the current billing period. \n \nb. \nEffective until June 30, 2013, the billed energy in each 30-minute billing interval for  HLF Delivery Service \nshall be the total number of kilowatt-hours recorded on the customer’s meter for the billing period multiplied \nby the ratio of the customer’s contract demand for  HLF Delivery Service to the greater of the customer’s \ncontract demand for  HLF Delivery Service or the highest 30 minute integrated demand recorded on the \ncustomer’s meter in the twelve months ending with the current billing period. \n \n \nEffective July 1, 2013, the billed energy in each 30-minute billing interval for HLF Delivery Service shall be \nthe total number of kilowatt-hours recorded on the customer’s meter for the billing period multiplied by the \nratio of the customer’s contract demand, adjusted for losses as provided in Sub Part (c) below, for HLF \nDelivery Service to the greater of the customer’s contract demand for HLF delivery or the highest 30 minute \nintegrated demand recorded on the customer’s meter in the current billing period. \n \nc. \nAdjustment for Losses for HLF Delivery Service: Effective July 1, 2013, the billed demand and billed \nenergy in (a) and (b) above will be adjusted for losses as provided in Rule 39.18 of this tariff. \n \n \n8. \nFor each of the Company’s subzones in which NYPA power is delivered to customers under this Rate Schedule S.C. \nNo. 4, the Company will calculate an Unaccounted for Energy Factor for NYPA load.  Unaccounted for Energy is \ngenerally defined as the difference between the NYISO reported wholesale subzone(s) load and the sum of LSE \nload, Municipality load, Load Modifiers, NYPA load and the Company’s load, including adjustments for \ndistribution losses (efficiency factor).  The Company also adjusts applicable LSE’s load to account for the average \nsystem wide Unaccounted for Energy in accordance with Rule 39.  \n \nThe difference between the monthly NYISO reported wholesale subzone load and the sum of the applicable subzone \nload of the Company, NYPA, Municipalities, and the Rule 39 adjusted LSE’s  load, including adjustments for \ndistribution losses (efficiency factor), is the monthly subzone Unaccounted for Energy. This quantity of monthly \nsubzone Unaccounted for Energy in question is allocated to the Company and NYPA on an hourly based subzonal \nload ratio share. The Company will report to the NYISO for NYISO billing and settlement purposes, the NYPA \nsubzone load requirements, inclusive of the monthly subzone Unaccounted for Energy adjustment and distribution \nloss adjustments."},{"page":184,"startToken":41294,"endToken":41620,"text":"Issued by Kenneth D. Daly, President, Syracuse, NY \n \nPSC NO:  220 ELECTRICITY \nLEAF: 405 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 5 \nINITIAL EFFECTIVE DATE: JULY 1, 2013 \nSUPERSEDING REVISION: 4 \n \n \n \nSERVICE CLASSIFICATION NO. 4 (Continued) \n \n9. \nBilling Quantities for SC-4 Supplemental Service \n \na. \nThe demand billed for SC-4 Supplemental Service taken hereunder shall be the greater of: \n \n(1)  \nThe amount, if any, by which the overall maximum 30 minute integrated demand as established by \nmetering within the billing period exceeds the sum of: \n \n(a)  \nthe customer’s demands for Niagara Power Delivery Service (adjusted for losses between \nthe Niagara Switchyard and the customer’s meter as provided in paragraphs 4 and 5 \nabove); and \n \n(b)  \nthe customer’s demands for Preservation Power Delivery Service (adjusted for losses \nbetween the St. Lawrence Switchyard and the customer’s meter as provided in paragraph \n4 above); and \n \n(c) \nthe customer’s demands for  HLF Delivery Service as determined at the meter according \nto the provisions of paragraph 7 above; and \n \n(d)  \nthe customer’s demands for EDP and/or PFJ Power supplied under Rule 34; or \n \n(2)  \nThe number of kilowatts of SC-4 Supplemental Service contracted for by the customer with the \nCompany and documented on the Company’s Form “C”; or \n \n(3)  \nThe minimum demand provisions of the Parent Service Classification as defined above. \n \nb. \nThe billed kilowatt-hours of SC-4 Supplemental Service in each 30 minute interval shall be the amount, if \nany, by which the total kilowatt-hours at delivery voltage for that interval exceeds the sum of: \n \n(1)  \nthe kilowatt-hours of Niagara Power Delivery Service received by the customer at the customer’s \nmeter in that interval; and \n \n(2)  \nthe kilowatt-hours of Preservation Power Delivery Service received by the customer at the \ncustomer’s meter in that interval; and \n \n(3) \nthe kilowatt-hours of  HLF Delivery Service received by the customer at the customer’s meter in \nthat interval; and \n \n(4)  \nthe kilowatt-hours of EDP and/or PFJR Service received by the customer under Rule 34 in that \ninterval;"},{"page":185,"startToken":41620,"endToken":42207,"text":"Issued by Sally Librera, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 406 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 6 \nINITIAL EFFECTIVE DATE: OCTOBER 1, 2025 \nSUPERSEDING REVISION: 5 \nSTAMPS: Issued in Compliance with Order in Case 22-E-0236, dated October 17, 2024. \n \n \nSERVICE CLASSIFICATION NO. 4 (Continued) \n \n(4)  \nthe kilowatt-hours of EDP and/or PFJR Service received by the customer under Rule 34 \nin that interval;  \n \nProvided, however, that no customer shall be deemed to have received more kilowatt-hours from \nthese four sources during any interval than its actual total metered kilowatt-hours received during \nthat interval. \n \n10.  \nThe Reactive Demand shall be the highest average RkVA of lagging reactive demand from all sources \nmeasured over a thirty-minute interval during the month less one-third of the highest kW demand measured \nduring the month. \n \n11. \nCustomers taking service under SC4 are eligible for EV Phase-In Rates. Such customer’s Charging Ratio, as \ndescribed in Rule 48.2.8; Load Factor Tier Level determination, as described in Rule 48.2.9; and Monthly EV \nPhase-In Rates, as described in Rule 48.2.11 will be applicable to the customers’ total load, inclusive of NYPA \ndeliveries. \n \nTERMS OF PAYMENT \n \nBills are due and payable when rendered. Full payment must be received on or before the date shown on the bill to \navoid a late payment charge pursuant to Rule 26.4. \n \nTERM \n \nInitial term of one (1) year and to continue thereafter for successive one (1) year terms until canceled effective at the \nexpiration of the initial or any succeeding one (1) year term by the customer by a notice in writing served on the \nCompany not less than ninety (90) days prior to the termination of the initial or any succeeding term, provided \nhowever that the service hereunder will be supplied only when taken in conjunction with NYPA power and \nregardless of term provisions will terminate upon permanent cessation of the supply to customer of said NYPA \npower.  In the event that the customer terminates its ESS arrangement with NYPA prior to its expiration according \nto its terms, the Company shall require written confirmation from both NYPA and the customer before terminating \nthe customer’s SC-4 service agreement. \n \nSPECIAL PROVISIONS: \n \nA.  \nCompany Facilities: Company shall not be required to provide facilities for SC-4 Supplemental Service, \nNiagara Power Delivery Service, Preservation Power Delivery Service or HLF Delivery Service in excess \nof the amount of the total demands for such services specified in the customer’s Application for Service. \n \nB.  \nBilling Period Adjustments: For a fractional part of a billing period at the beginning or end of service, the \nkilowatt Demand and Reactive Demand charges and the minimum charge shall each be proportionately \nadjusted in the ratio that the number of hours that electric service is furnished to customer in such fractional \nbilling period bears to the total number of hours in the billing period involved. \n \nC.  \nMetering Voltage: When service is metered at a voltage either higher or lower than the voltage of \ndelivery, metered quantities will be adjusted for billing as provided in Rule 25.4. \n \nD.  \nOn-Site Generation Special Provision:  Customers are obligated to certify, subject to the Company’s \napproval, on-site generation (OSG) installations on the Company’s Form G, Application For Electric \nStandby Service, and will be subject to the provisions of Service Classification No. 7 unless the customer \nhas electrically isolated a portion of their load as defined in Rule 1.48 or has installed the OSG to be used \nexclusively as an Emergency Power System as defined in Rule 1.50."},{"page":186,"startToken":42207,"endToken":42762,"text":"Issued by Sally Librera, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 407 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 14 \nINITIAL EFFECTIVE DATE: SEPTEMBER 1, 2025 \nSUPERSEDING REVISION: 12 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025. \n \nSERVICE CLASSIFICATION NO. 4 (Continued) \n \nE.  \nIndividually Negotiated Rates: The Company will entertain, when circumstances warrant and when NYPA consents \nto any required changes in the applicable billing methodology for the delivery of NYPA Power, individually \nnegotiated contracts under rate schedule S.C. No. 12 with customers who would otherwise be served under this \nService Classification. \n \nF.  \nExemption from Certain Provisions of Rate Schedule S.C. No. 3: Customers receiving SC-4 Supplemental Service \nunder rate schedule S.C. No. 4 who are billed in accordance with the provisions of rate schedule S.C. No. 3 shall be \nexempt from Special Provisions E, F, and H of that rate schedule. \n \nG.  \nSpecial Rule for SC-4 Supplemental Service:  SC-4 Supplemental Service, with the exception of supplemental \nservice that is EJP qualifying load, shall be subject to all surcharges and tax factors imposed on service under the \napplicable Parent Service Classification, including without limitation the SBC established in Rule 41, the Renewable \nPortfolio Surcharge established in Rule 49 and the Tax Factor established in Rule 32.    \n \nH.  \nSpecial Rules for HLF Delivery Service \n \n(1)  \nHLF Delivery Service shall be subject to all surcharges and tax factors imposed on service under the \napplicable Parent Service Classification, with the exception of Rule 41- SBC, Rule 57 - RDM and Rule \n46.2 - LTC.   \n \n(2)  \nIn the event that the customer fails to execute a Form C Agreement specifying its contract demand for HLF \nDelivery Service, the customer’s contract demand for such service shall be deemed to be the lesser of:  \n \n(a)  \nthe customer’s maximum entitlement to HLF Delivery Service under the May 22, 1997 Settlement; \nor  \n \n(b)  \nthe amount of firm point-to-point transmission capacity on the Company’s system reserved by \nNYPA for deliveries to the customer, adjusted for losses in transmission and distribution. \n \n \n(3)  \n(a)  \nIn the event that the customer’s total allocation(s) of HLF Power at a single location is reduced the \nfollowing special rules shall apply: \n \n(i)  \nIf SC-4 Supplemental Service did not contribute to meeting the customer’s maximum \ndemand in the billing month or any of the eleven preceding months prior to July 1, 2013 \nonly, the customer’s demand in the months preceding the reduction of the customer’s \ntotal NYPA ESS shall not be considered in calculating the customer’s bills under subpart \n(a) above, and  \n \n (ii)  \nIf SC-4 Supplemental Service did contribute to the customer’s maximum demand in the \nbilling month or any of the preceding eleven billing months, the Company shall adjust the \ncustomer’s maximum demand for each of the preceding eleven months prior to July 1, \n2013 only solely for the purpose of calculating the current month’s bills for HLF Service. \n \nThis adjustment shall be performed by subtracting the contribution to the customer’s maximum \nmetered demand in each of the preceding eleven billing months prior to July 1, 2013 only, made \nby the customer’s reduced contract capacity for NYPA ESS from the customer’s overall maximum \nmetered demand in each such month. These adjusted monthly maximum metered demands shall \nthen be used to determine the customer’s bill for HLF Delivery Service for the current month."},{"page":187,"startToken":42762,"endToken":43248,"text":"Issued by Rudolph L. Wynter, President, Syracuse, NY \nPSC NO:  220 ELECTRICITY \nLEAF: 408 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 12 \nINITIAL EFFECTIVE DATE: FEBRUARY 1, 2022 \nSUPERSEDING REVISION: 11 \nSTAMPS: Issued in Compliance with Order in Case 20-E-0380, issued January 20, 2022. \n \n \n \nSERVICE CLASSIFICATION NO. 4 (Continued) \n \n (b) \nNotwithstanding the provisions of subpart (a) of this Special Provision (H) (3), no deliveries of \nNYPA power received by the customer prior to September 1, 1998 shall be considered in \ncalculating the amounts owed by the customer to the Company for  HLF Delivery Service received \nby the customer on or after that date. \n \n(4) \nHLF Delivery Service shall be restricted to customers that would qualify for service under the Company’s \nrate schedule S.C. No. 3-A based on their combined actual demands for SC-4 Supplemental Service, HLF \nDelivery Service and PFJR Service. \n \nI.  \nSpecial Rules for Niagara Power Delivery Service and Preservation Power Delivery Service \n \n1. \nPreservation Power Delivery Service and Niagara Power Delivery Service associated with “New” \nallocations of Expansion and Replacement Power are subject to the Tax Factor established in Rule 32.,  \n \n2. \nNiagara Power Delivery Service associated with “Existing” allocations of Expansion and Replacement \nPower and “Additional” allocations of Expansion Power are subject to the Tax Factor established in Rule \n32. \n \n3. \nFor those customers whose agreements with NYPA and the Company include an historic demand, the \nhistoric demand will be billed as SC-4 Supplemental Service and will be subtracted from the current \nmonth’s metered demand and (prior to July 1, 2013 only for Niagara Power Delivery Service) from the \npeak demand of the preceding 12 full months to establish the remaining demand then apportioned to NYPA \nService (whether in the form of Niagara Power Delivery Service of Preservation Power Delivery Service) \nand SC-4 Supplemental Service (as additional power).  In no instance, however, shall the total demand (the \nsum of the historic and additional power demands) billed by Company under its rates exceed the total \nmetered demand for the billing period. \n \nThe energy associated with the historic demand will be determined by apportioning the total metered \nenergy by the ratio that the historic demand (supplied by the Company) bears to the metered demand for \nthe current month.  The energy associated with all other deliveries of power will be determined in \naccordance with the applicable provisions of this Rate Schedule S.C. No. 4 with the following \nmodifications: \n \n1. \nThe customer’s metered demand shall be reduced by the amount of the historic demand. \n \n2. \nThe customer’s maximum demand for the preceding 11 months shall be reduced by the amount of \nthe historic demand.  For Niagara Power Delivery Service provided prior to July 1, 2013 only, the \ncustomer’s maximum demand for the preceding 11 months shall be reduced by the amount of the \nhistoric demand. \n \n3. \nThe customer’s metered energy shall also be reduced by the amount of energy associated with the \nhistoric demand as determined above."},{"page":188,"startToken":43248,"endToken":43642,"text":"Issued by Rudolph L. Wynter, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 408.1 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 20 \nINITIAL EFFECTIVE DATE: JULY 1, 2023 \nSUPERSEDING REVISION:19 \nSTAMPS: Issued in Compliance with Order in Case 20-E-0380, issued January 20, 2022. \n \nSERVICE CLASSIFICATION NO. 4 (Continued) \n \nJ. \nCustomer Charges For HLF Delivery Service, effective until June 30, 2013: \n \nCustomers eligible to receive HLF Delivery Service shall be subject to Customer Charges which are established \nbased upon whether or not the customer utilizes supplemental electric service from the Company. \n \nCustomers who do not use supplemental electric service shall have their customer charges frozen at the rates below.  \n \n \n \n \n \nWithout Supplemental  \n \nWith Supplemental  \nDelivery Level \n \n \nElectric Service  \n \nElectric Service  \n \nSecondary (<2.2 kV) \n \n$902.00  \n $3,000.00 \nPrimary (2.2 B 15 kV) \n \n$902.00  \n $3,000.00 \nSubtransmission (22 B 50 kV) \n $1,400.00 \n $3,700.00 \nTransmission (>60 kV) \n $1,726.55  \n $7,500.00 \n \n \nCustomers who utilize supplemental electric service shall have their customer charges set equal to the customer \ncharges established in Rate Schedule S.C. No. 3A as shown above. \n \n \nCustomer Charges For HLF Delivery Service, effective July 1, 2013: \nEffective July 1, 2013, the monthly Customer Charge will be equal to 90% of the HLF Delivery Service customer’s \nparent service classification Customer Charge. \n \n \nCustomer Charges For HLF Delivery Service, effective January 1, 2016: \nEffective January 1, 2016, the monthly Customer Charge will be equal to 100% of the HLF Delivery Service \ncustomer’s parent service classification Customer Charge. \n \n \nK. \nDistribution Delivery Rates for HLF Delivery Service, effective until June 30, 2013: \nCustomers eligible to receive HLF Delivery Service shall be subject to distribution delivery rates as set out below: \n \n \nRate per kW of Delivery level Contract Demand \n \nSecondary (<2.2 kV)  \n \n$6.09 \nPrimary (2.2 B 15 kV)  \n \n$8.09 \nSubtransmission (22 B 50 kV)  \n$2.59 \nTransmission (>60 kV) \n \n$2.08 \n \n \nDistribution Delivery Rates for HLF Delivery Service, effective July 1, 2013: \n \nEffective July 1, 2013, the per kW Distribution Demand Charge will be equal to 90% of the HLF Delivery Service \ncustomer’s parent service classification Distribution Demand Charge. \n \n \nCustomer Charges For HLF Delivery Service, effective January 1, 2016: \nEffective January 1, 2016, the per kW Distribution Demand Charge will be equal to 100% of the HLF Delivery \nService customer’s parent service classification Distribution Demand Charge."},{"page":189,"startToken":43642,"endToken":44082,"text":"Issued by Sally Librera, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 408.4 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 20 \nINITIAL EFFECTIVE DATE: APRIL 1, 2026 \nSUPERSEDING REVISION: 19 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025. \n \n \nSERVICE CLASSIFICATION NO. 4 (Continued) \n \nThe distribution delivery rates for New Allocations of Preservation Power and Niagara Power to S.C. 4 customers \nwith supplemental service provided at the S.C. No. 3 rates are as follows: \n \n \nCustomer \nRate Per kW of \nDelivery Level \nCharge \nContract Demand \nSecondary (<2.2 kV)  \n$870.00 \n$15.62 \nPrimary (2.2 - 15 kV) \n$950.00 \n$14.14 \nSubtransmission (22 - 50 kV) \n$1,600.00 \n$4.36 \nTransmission (>60 kV) \n$1,600.00 \n$4.36 \n \nThe distribution delivery rates for New Allocations of Preservation Power and NYPA hydro to S.C. 4 customers \nwith supplemental service provided at the S.C. No. 3A rates are as follows: \n \n \nCustomer \nRate Per kW of \nDelivery Level  \nCharge \nContract Demand \nSecondary (<2.2 kV) \n$4,150.00 \n$15.58 \nPrimary (2.2 - 15 kV) \n$4,150.00 \n$15.58 \nSubtransmission (22 - 50 kV) \n$5,100.00 \n$5.42 \nTransmission (>60 kV)  \n$10,350.00 \n$4.89 \n \nNew Allocations are defined in Special Provision M below. \n \nM.  \nExisting, Additional and New Allocations Defined \n \n1. \nRule for Allocations of Niagara Power: \n \na. \nAdditional Allocations, as used in Special Provision L above shall be defined as allocations of \nNiagara Power approved by NYPA’s trustees between February 1, 2002 and September 1, 2006 \nthat were allocated exclusively to serve incremental load at the customer’s premises.  For the \npurpose of this provision, incremental load is load that is created by the construction or installation \nof new facilities (buildings, machinery and equipment) or expansion of existing facilities, \nprovided that in the case of the expansion of existing facilities, incremental load shall not include \nthe load of such facilities prior to expansion or addition. \n \nb. \nNew Allocations as used in Special Provision L above shall be defined as  all allocations of \nReplacement Power approved by NYPA’s trustees on and after February 1, 2002 and those \nallocations of Expansion Power approved by NYPA’s trustees on and after February 1, 2002 that \nare not “Additional Allocations,” but shall not include Replacement Power that becomes available \nfor reallocation prior to September 30, 2002 under Article V of the Agreement: “Allocation and \nTransfer of Replacement Power Pursuant to Niagara Contract NS-1” dated April 4, 1988; or \nTransfers and assignments of allocations from a customer premise /location on the Company’s \nsystem (i.e., a change in ownership/occupancy of a premise / location will not be deemed \"new\") \n."},{"page":190,"startToken":44082,"endToken":44523,"text":"Issued by Rudolph L. Wynter, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 408.4 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 20 \nINITIAL EFFECTIVE DATE: APRIL 1, 2026 \nSUPERSEDING REVISION: 19 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025. \n \n \nSERVICE CLASSIFICATION NO. 4 (Continued) \n \nThe distribution delivery rates for New Allocations of Preservation Power and Niagara Power to S.C. 4 customers \nwith supplemental service provided at the S.C. No. 3 rates are as follows: \n \n \nCustomer \nRate Per kW of \nDelivery Level \nCharge \nContract Demand \nSecondary (<2.2 kV)  \n$870.00 \n$15.62 \nPrimary (2.2 - 15 kV) \n$950.00 \n$14.14 \nSubtransmission (22 - 50 kV) \n$1,600.00 \n$4.36 \nTransmission (>60 kV) \n$1,600.00 \n$4.36 \n \nThe distribution delivery rates for New Allocations of Preservation Power and NYPA hydro to S.C. 4 customers \nwith supplemental service provided at the S.C. No. 3A rates are as follows: \n \n \nCustomer \nRate Per kW of \nDelivery Level  \nCharge \nContract Demand \nSecondary (<2.2 kV) \n$4,150.00 \n$15.58 \nPrimary (2.2 - 15 kV) \n$4,150.00 \n$15.58 \nSubtransmission (22 - 50 kV) \n$5,100.00 \n$5.42 \nTransmission (>60 kV)  \n$10,350.00 \n$4.89 \n \nNew Allocations are defined in Special Provision M below. \n \nM.  \nExisting, Additional and New Allocations Defined \n \n1. \nRule for Allocations of Niagara Power: \n \na. \nAdditional Allocations, as used in Special Provision L above shall be defined as allocations of \nNiagara Power approved by NYPA’s trustees between February 1, 2002 and September 1, 2006 \nthat were allocated exclusively to serve incremental load at the customer’s premises.  For the \npurpose of this provision, incremental load is load that is created by the construction or installation \nof new facilities (buildings, machinery and equipment) or expansion of existing facilities, \nprovided that in the case of the expansion of existing facilities, incremental load shall not include \nthe load of such facilities prior to expansion or addition. \n \nb. \nNew Allocations as used in Special Provision L above shall be defined as  all allocations of \nReplacement Power approved by NYPA’s trustees on and after February 1, 2002 and those \nallocations of Expansion Power approved by NYPA’s trustees on and after February 1, 2002 that \nare not “Additional Allocations,” but shall not include Replacement Power that becomes available \nfor reallocation prior to September 30, 2002 under Article V of the Agreement: “Allocation and \nTransfer of Replacement Power Pursuant to Niagara Contract NS-1” dated April 4, 1988; or \nTransfers and assignments of allocations from a customer premise /location on the Company’s \nsystem (i.e., a change in ownership/occupancy of a premise / location will not be deemed \"new\") \n."},{"page":191,"startToken":44523,"endToken":44854,"text":"Issued by Sally Librera, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 408.6 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 8 \nINITIAL EFFECTIVE DATE: SEPTEMBER 1, 2025 \nSUPERSEDING REVISION: 6 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025. \n \nSERVICE CLASSIFICATION NO. 4 (Continued) \n \nP. \nThe following rules apply to a customer combining SC4 Supplemental Service with the Excelsior Jobs Program \n(EJP) and whose total loss-adjusted NYPA demand allocations are greater than its lowest monthly EJP base period \nbilling demand. \n \n(1) When the customer accepts its NYPA allocation or whenever the Company receives notification from NYPA \nthat the customer’s NYPA allocation is changing or whenever the customer qualifies for EJP, the customer must \nmake an election to choose either: \n \n(a) billing NYPA delivery demand pursuant to the billing methodology in this SC-4; or  \n \n(b) limiting the billed NYPA delivery demand to the lesser of the EJP base period billing demand or the billed \nNYPA delivery demand pursuant to the billing methodology in this SC-4. \n \n(2) Regardless of the election made in Section 1 above, the customer will receive its NYPA commodity service \npursuant to the billing methodology described in this SC-4.   \n \n \n(3) A customer who meets the initial requirements of this Special Provision P may receive additional discounts \ndescribed in Section 3(a) below, provided the customer demonstrates a financial need as prescribed in Service \nClassification No.12, Special Contract Rates, in either Sections 4.3.2 and 4.3.3 (Revitalization) or Sections 4.4.2 \nand 4.4.3 (Relocation). \n \n(a) Eligible customers who have a NYPA allocation and an EJP contract will be exempt from SBC established \nin Rule 41 on both their NYPA allocation and qualifying EJP load.  \n \n(b) To the extent that the financial need demonstrated by the customer is greater than the benefit derived from \nSection 3 (a), the customer may apply for a Special Contract pursuant to all terms and conditions of Service \nClassification No. 12.  \n \nQ. \nRESERVED FOR FUTURE USE"},{"page":192,"startToken":44854,"endToken":44865,"text":"Niagara Mohawk \nService Classification 7: Standby Service and Optional \nRate Service"},{"page":193,"startToken":44865,"endToken":45237,"text":"Issued by Sally Librera, President, Syracuse, NY \n \nPSC NO: 220 ELECTRICITY \nLEAF: 415 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 5 \nINITIAL EFFECTIVE DATE: SEPTEMBER 1, 2025 \nSUPERSEDING REVISION: 3 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025. \n \nSERVICE CLASSIFICATION NO. 7 \nSTANDBY SERVICE AND OPTIONAL RATE SERVICE \n \nAPPLICABLE TO USE OF SERVICE FOR: \nThis Service Classification No. 7 (“SC-7”) is applicable to customers meeting the requirements of (a) through (d) \nbelow (“Standby Service Customers”) and customers meeting the requirements of (e) below (“Optional Rate \nCustomers”): \n \nStandby Service: \n \n(a) \nCustomers who have generation installed on their site, whether the generation equipment is owned \nby the customer or a third party. Generation, for purposes of this service classification, shall \ninclude energy storage systems; or \n \n(b) \nCustomers who are directly interconnected with a Wholesale Generator, as defined in Rule 1.76; \nor \n \n(c) \nWholesale Generators who require service from the Company when their own generating \nequipment is not sufficient to meet their own load; or \n \n(d) \nCustomers with on-site generation compensated under Rule 40.2, Value Stack, that meet the \nrequirements for compensation in accordance with Rule 40.2.1.1, and that are not otherwise \nexempt from SC-7 in accordance with Section 4 of SC- 7. \n \nOptional Rate Service: \n \n(e) \nCustomer that opt into SC-7, who do not otherwise meet the requirements of Standby Service.  \n(“Optional Rate Customers”) must remain on SC-7 for a minimum period of one year.  Any \ncustomer may opt into SC-7 with the exception of SC-12 customers, streetlighting customers, and \nunmetered customers. \n  \nMore specifically: \n \n1. \nStandby Service shall apply to: (a.) customers with on-site generation serving load that is not isolated from \nthe grid in accordance with Rule 1.48; (b.) Wholesale Generators that rely on the electric utility to serve \nelectric loads that would otherwise be served by the generator such as station power used for the heating, \nlighting, air-conditioning, and office equipment needs of the buildings housing the generator and associated \nsupport facilities located on a generating facility's site, and/or to facilitate the re-starting of the generator \nfollowing an outage. Standby rates will also apply to Wholesale Generators that take station service \nthrough the same bus bar as they supply the wholesale grid."},{"page":194,"startToken":45237,"endToken":45646,"text":"PSC NO:  220 ELECTRICITY \nLEAF: 415.1 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 0 \nINITIAL EFFECTIVE DATE: DECEMBER 9, 2019 \nSUPERSEDING REVISION: \nSTAMPS: Issued in Compliance with Order in Case 15-E-0751 issued December 13, 2018. \n \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \n2. \nSame Bus Bar \n \n“Same Bus Bar” is defined as a common electrical point of interconnection on the same physical bus bar \nstructure located at one substation of the utility and an individual customer’s system at the single voltage \nlevel at which the customer takes service and has taken service as of March 2002.  This common point of \ninterconnection may include up to one load serving connection, or tap, (such tap is in addition to the single \npoint of delivery service from the generating customer to the NMPC delivery system being metered), from \na single physical bus bar (one tap must be connecting the customer's generation output to the bus and a \nsecond tap must be connecting the customer's electric service to the bus) located at an NMPC substation. \nThe customer’s generation must be on a single unitary tract of land; adjoining and abutting the land upon \nwhich the NMPC substation is located and the points of delivery and receipt must not be more than 500’ \napart.  The presence of Company equipment, including but not limited to switches, fuses, transformers, and \ncircuit breakers, between the point(s) of delivery is not considered Same Bus Bar.   If the single physical \nbus bar or a portion thereof, is relied upon to deliver electricity between the customer’s generation and \ncustomer’s load, i.e., the point of common coupling, the customer will enter into a financial agreement with \nthe Company for payment of use of that portion of the Company's equipment that comprises the point of \ncommon coupling necessary to move the generation from the customer to the customer’s load. The amount \nof the load will be netted from the customers’ generation on a 15-minute interval basis. The customer is \nresponsible for all costs of metering, reconfiguration, instrument transformers and telemetry equipment \nnecessary to implement the netting of generation and load that meets the requirements above. When the \nforgoing requirements are met, the customer will be eligible to net generation and load.  In this case, the \ncustomer, upon entering into a financial agreement with the Company, will be considered as netting the \ncustomer’s load from \"behind the meter” for the limited purposes of electricity supply service provision \nunder Rule 46 and for delivery services."},{"page":195,"startToken":45646,"endToken":46109,"text":"Issued by Sally Librera, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 416 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 6 \nINITIAL EFFECTIVE DATE: FEBRUARY 1, 2026 \nSUPERSEDING REVISION: 5 \nSTAMPS: Issued in Compliance with Order in Case 15-E-0751, dated July 18, 2025. \n \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \n3. \nFor Standby Service Customers, the Parent Service Classification shall be defined based upon the \napplicable Contract Demand at the delivery point (as initially calculated by the Company). For customers \nreceiving Buyback Service from the Company under SC-6, the customer’s Service Demand kW as specified \nin SC-6 Sections 1.4 and 2.4, as applicable, shall be used in lieu of the monthly measured demand specified \nabove when determining Parent Service Classification applicability of this SC7. \n \n4.  \nExemptions From SC7 \nThe following customers shall not be subject to SC-7 but shall be served under the customer's otherwise \napplicable service classification unless the customer chooses to opt into SC-7 as an Optional Rate Customer \n(with the exception of customers specific to 4E below who are not eligible to opt into SC-7 as an Optional \nRate Customer). \n \n \nA.  \n“Behind the Meter” Service \n \n \nSelf-supplied electricity where a Wholesale Generator, when operating, supplies all of its electric energy \nneeds from \"behind the meter\" (that is, the energy does not pass through the point of interconnection \nbetween the generator's facility and the utility's retail delivery system to which it is interconnected). \n \n \nB. \n Separately Metered Accounts Not Served by OSG \n \nAll separately metered service accounts within the premises whereby electricity consumption is not \notherwise served directly through facilities owned by the customer (e.g., power to the facility's outer \nbuildings) shall be provided at the standard tariff rates for the Parent Service Classification. \n \n \nC.  \nSmall Generators  \n \nCustomers with a nameplate aggregate generator(s) 5 kVA or smaller shall be served at the standard tariff \nrates for the Parent Service Classification. \n \n \n \nD. \n Certain Customers Grandfathered Under Form Gf:  Standby service rates shall not apply to \ncustomers served on the standard classification as of January 1, 2002 that have executed a form Gf and \nwere grandfathered as a result of Form Gf of PSC 207 as of January 1, 2002; except where such customer is \na SC-3 subtransmission or transmission voltage level or SC-3A subtransmission or transmission voltage \nlevel customer and is a Wholesale Generator. Effective May 1, 2006, customers grandfathered under this \nprovision may elect at any time to take service under this service classification.  Such customers may \nexercise this option only once and may not elect to receive service under another service classification, \nunless otherwise eligible therefore.  This grandfathering provision shall expire and no longer apply and \nStandby Service Rates shall apply if and at such time the customer installs any New Generating Equipment \nand this SC7 Tariff shall apply as defined herein."},{"page":196,"startToken":46109,"endToken":46479,"text":"Issued by Rudolph L. Wynter, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 417 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 12 \nINITIAL EFFECTIVE DATE: JANUARY 1, 2024 \nSUPERSEDING REVISION: 11 \nSTAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023. \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \n4. \nExemptions From SC-7 (Continued) \n \nD.  \nCertain Customers Grandfathered Under Form Gf: (Continued) \n \nFor the purposes of this provision, New Generating Equipment shall include the installation or the replacement of \nthe following items of electric plant:   \n(i) \nfor steam production plant: boiler plant equipment; engines and engine-driven  \n \ngenerators; and turbogenerator units; \n(ii)  \nfor nuclear production plant: reactor plant equipment, and turbogenerator units;  \n(iii)  \nfor hydraulic production plant: turbines, and generators; and  \n(iv)  \nfor other electric production equipment: fuel holders, producers, and \n \naccessories; prime movers; and generators. \n \nThe installation or replacement of electric plant ordinarily classified as maintenance or repair expenses or \nreplacements under warranty as a result of a defect or casualty loss, or of water wheels, automotive and marine \ninternal combustion engines fired by natural gas which were designed and installed with the intention of routine \nreplacement, and generator rewinds shall not be deemed to be New Generating Equipment. \n \nE.  \nNYPA Programs and SC 12 Contracts \nStandby service rates shall not apply to that portion of a customer's delivery service associated with the provision of \napplicable NYPA programs or that portion of delivery service served under the terms and conditions of an SC-12 \ncontract. Customers under this 4.E are not eligible to opt into SC-7 as an Optional Rate Customer. \n \nF.  \nEnvironmentally Advantageous Technologies (“EAT”) Exemptions \n \nStandby service rates shall not apply to customers who install On-Site Generators (“OSG”) that are: \n(1)   solar thermal;  \n(2)   solar photovoltaic; \n(3)   onshore and offshore wind; \n(4)   hydroelectric;   \n(5)   geothermal electric; \n(6)   geothermal ground source heat; \n(7)   tidal energy; \n(8)   wave energy; \n(9)   ocean thermal; \n(10) Fuel cells which do not utilize a fossil fuel resource in the process of generating electricity.  Fuel cells are \npermitted to utilize biomass, biogas, or hydrogen, provided that the manufacture or production of such fuels \ndoes not include the combustion or electrolysis of fossil fuels, or the use of fossil fuel or non-renewable grid \npower in the conversion process."},{"page":197,"startToken":46479,"endToken":46789,"text":"Issued by Rudolph L. Wynter, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 417.1 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 1 \nINITIAL EFFECTIVE DATE:  JUNE 1, 2023 \nSUPERSEDING REVISION: 0 \nSTAMPS: Issued in Compliance with Order in Case 19-E-0079 dated May 18, 2023. \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \n(11) small, efficient types of combined heat and power (“CHP”) generation that do not exceed 1 MW of capacity \nand meet the following criteria: \n \ni.  Annual overall thermal and electrical energy efficiency should not be less than 60% based on the higher  \nheating value (“HHV”) of the fuel input;  \nii.  The usable thermal energy component should absorb a minimum of 20% of the CHP facility’s total \n \nusable annual energy output; \niii.  The OSG capacity shall be determined by aggregating the nameplate ratings of the generation units, \ninstalled at its location, excluding emergency generation units used only during a utility distribution \nsystem failure or in response to the NYISO Emergency Demand Response Program; and \niv.  An eligible CHP facility shall demonstrate to the Company that its generation installation meets an \nenvironmental standard of no more than 1.4 lbs./MWh of NOx emissions based on its electrical and \nmechanical output or its rated capacity.  Units that have completed a Coordinated Electric System \nInterconnection Review (\"CESIR”) by April 1, 2018 will be subject to the previously applicable standard of \nno more than 4.4 lbs./MWh of NOx emissions. \nv.  The CHP facility must be placed in service before May 31, 2021. \nvi.   Customers shall comply with the above criteria and in addition: \n \n1.  Monitor and record efficiency data, which shall include the annual quantity of fuel fired, the annual \nquantity of generated electricity, and the annual quantity of the thermal heat recovered in the heat \nrecovery process;   \n2.  have records available for Company inspection; and \n3.  retain the records for a 3-year period."},{"page":198,"startToken":46789,"endToken":47361,"text":"Issued by Sally Librera, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 418 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 17 \nINITIAL EFFECTIVE DATE: SEPTEMBER 1, 2025 \nSUPERSEDING REVISION: 15 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025. \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \n4. \nExemptions From SC-7 (Continued) \n \nF.  \nEnvironmentally Advantageous Technologies (“EAT”) Exemptions (Continued) \n \n(12) Effective June 1, 2015, a customer who installs and places in service a new CHP facility before May 31, \n2021, greater than 1 MW and up to 15 MW, exclusive, may exercise a one-time option to be exempt from \nstandby rates and pay standard delivery rates for a period of four years.   \ni. The exemption, once obtained, would be applicable for a period of four years commencing from the in-\nservice date of the CHP facility. After the four-year period, the customer will be subject to the then-\napplicable standby rates or to any such tariff which replaces standby rates, if applicable. \nii. Once exempt, the customer may exercise the option to exit the exemption one time prior to the end of the \ncustomer’s one- time exemption period. \niii. Customers exercising this option will also be required to install, at their expense, revenue grade, interval \nmeters that will measure generation output, and attach telemetry equipment sufficient to transmit \noperational information to the Company. \niii. Customers under this Section 7 are also subject to the requirements of Section 6, Sub Sections i-v. \n(13) Energy storage systems with inverter capability of up to 1 MW. However, customers who install energy \nstorage systems to help manage the demand of EV charging load, with said energy storage systems having \ninverter capability greater than 1 MW and less than or equal to the sum of nameplate EV charging \ncapability, are also exempt provided that such installations meet all other applicable interconnection and \nstandby service requirements. \n \nCustomers qualifying for the EAT Exemption shall comply with all the following requirements:  \n \na) \nThe OSG is placed in service after July 1, 2002, except that for CHP  \nfacilities, in accordance with Section 7 above, the OSG is placed in service between June 1, 2015 \nand May 31, 2021. \nb) \nThe OSG is connected to the customer’s electric system using an automated or manual transfer \nswitch or the electrical equivalent of such a switch approved by the Company consistent with \nElectric System Bulletin 750 as it may be amended from time to time. \nc) \nThe customer executes, and the Company accepts, a Form G as required under the special \nprovisions of the applicable Service Classification for all generators on the premises.  The \ncustomer shall state its intended use of the OSG facilities on the Form G in the blank spaces \nprovided for special conditions. \nd)  \nThe EAT Exemption will not apply to sustainably managed biomass, biogas, and fuel cell units           \nwhich utilize fossil fuel resources installed on or after June 1, 2023. \n \nIn the event the customer fails to comply with provisions (a) through (c) above, the Company shall have the \nfollowing rights: \n \n \n(a) to bill the customer standby service rates for those amounts of total Electric Service which the \nCompany reasonably estimated were received by the customer during times when Electric Service \nfrom the Company was available to the customer; and \n \n(b) to require the customer to install OSG meter(s) on all its generators on the premises within a mutually \nacceptable schedule and upon receipt of written notice from the Company."},{"page":199,"startToken":47361,"endToken":47571,"text":"Issued by Sally Librera, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 418.1 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 5 \nINITIAL EFFECTIVE DATE: SEPTEMBER 1, 2025 \nSUPERSEDING REVISION: 3 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025. \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nF. \nEnvironmentally Advantageous Technologies (“EAT”) Exemptions (Continued) \n \nCustomers qualifying for the EAT Exemption shall be allowed to make a one-time irrevocable election to refuse the \nEAT Exemption and, instead, take service at full standby service rates, upon providing thirty (30) days written \nnotice to the Company before commencing operation of the OSG; provided, however, that if operation of the OSG \ncommenced between July 1, 2002 and December 31, 2011, the Customer must make its one-time election by March \n1, 2012.  Customers qualifying for an EAT exemption under Section 12 above will have a one-time exemption in \naccordance with Section 4.F (12) (ii) above. \n \nG. \nNet Metering for Solar, Farm Waste, Wind, Micro-Combined Heat and Power, Micro-Hydroelectric \nGenerating Equipment, and Fuel Cell Electric Generating Systems - Standby service rates shall not apply to \nCustomer-Generators who have the above electric generating equipment provided they have executed an SIR \nContract and have complied with all the requirements of Rule 36 and Rule 37 of this tariff."},{"page":200,"startToken":47571,"endToken":48076,"text":"PSC NO:  220 ELECTRICITY \nLEAF: 419 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 3 \nINITIAL EFFECTIVE DATE: DECEMBER 9, 2019 \nSUPERSEDING REVISION: 2 \nSTAMPS: Issued in Compliance with Order in Case 15-E-0751 issued December 13, 2018. \n \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nH. \nEmergency Generators \nCustomers who install an Emergency Power System (as defined in Rule 1.50) may be exempted from the \nrequirement of service under this S.C. No. 7 if the customer commits in a written agreement with the \nCompany that the on-site generators shall be subject to all of the following requirements: \n \n1) \nEach such OSG shall be designated in the customer's Standby Service Application with the Company as an \nEmergency Power System (\"Emergency OSG\") pursuant to Rules 1.50; \n \n2) \nEach such Emergency OSG is not capable of being operated in parallel with the Company's system other than \nfor closed-transition transfer switching where the term \"closed-transition transfer\" is characterized as a \nmomentary make-before-break switching sequence. \n \n3) \nEach such Emergency OSG is connected to the customer's electric system using an automated or manual \ntransfer switch or the electrical equivalent of such a switch approved by the Company. \n \n4) \nThe Emergency OSG is used exclusively for purposes of Emergency Power System (defined in Rule 1.50). \n \n5) \nNo load may be served by Emergency OSG while Electric Service is being provided by the Company to the \npremises except: \n \n(i) for the periods of time as required by statute or regulation, and \n(ii) in the absence of a statutory or regulatory requirement, such times so as to adequately test such \nsystems, not to exceed 10 hours per month or as otherwise agreed to by the Company in the \nStandby Service Application, and \n(ii) for periods of time called by the NYISO for EDRP or ICAP(UCAP). \n \n6) \nThe customer shall maintain an operating log for each Emergency OSG indicating the date, time, hours, and \npurpose of each operation of each such facility.  This log shall be made available to the Company upon \nrequest.  If the customer fails to maintain this log or to provide it to the Company on request, the Company \nshall have the following rights: \n \n \n(i) to bill the customer for those amounts of Electric Service which the Company reasonably \nestimated were inappropriately supplied by the customer’s generator during times when Electric \nService from the Company was available to the customer; and \n \n \nIn all cases, the customer shall remain obligated to execute and have the Company accept a Standby Service \nApplication (Form G) as applicable under the special provisions of the applicable service classification for all \nEmergency Generators on the premises.  The customer shall state its intended use of the OSG facilities on the \nStandby Service Application in the blank spaces provided for special conditions. \n \nI. \nCustomers served on SC-2D with a contract demand less than 50 kW may elect to remain on the SC-2D \nstandard service classification or may choose to install an interval meter and receive standby rates. \n \nJ. \nCustomers who receive compensation under Rule 40.2.3.2 for Hybrid Facilities."},{"page":201,"startToken":48076,"endToken":48166,"text":"Issued by Sally Librera, President, Syracuse, NY \n \nPSC NO: 220 ELECTRICITY \nLEAF: 419.1 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 2 \nINITIAL EFFECTIVE DATE: SEPTEMBER 1, 2025 \nSUPERSEDING REVISION: 0 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025. \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \n4. \nExemptions From SC-7 (Continued) \n \nK. \nCustomers with stand-alone energy storage systems charging for wholesale purposes will be billed \npursuant to the WDS, at such time that the WDS tariff becomes effective, for charging purposes and are not subject \nto Standby Service rates."},{"page":202,"startToken":48166,"endToken":48557,"text":"Issued by Sally Librera, President, Syracuse, NY \n \nPSC NO: 220 ELECTRICITY \nLEAF: 420 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 5 \nINITIAL EFFECTIVE DATE: FEBRUARY 1, 2026 \nSUPERSEDING REVISION: 4 \nSTAMPS: Issued in Compliance with Order in Case15-E-0751, dated  July 18, 2025. \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nAPPLICATION FOR SERVICE: \n \nStandby Rate Service: \nCustomers with on-site generation must apply for service by providing the Company with an executed Form G, \nApplication For Electric Standby Service and interconnection agreement, both of which are available from Company \nrepresentatives.  Customers operating an on-site generator unit 5 MW or less may apply for service using the SIR, \navailable from Company representatives.  Customers in excess of 5 MW, that also have an on-site generator, must \nexecute an Interconnection Agreement with the Company.  Customers that do not have an on-site generator must apply \nusing the Company’s Form C – Application for Electric Service.   \n \nOptional Rate Service: \nEligible customers must apply for service by providing the Company with an executed Form C which is available from \nCompany representatives.   \n \nCHARACTER OF SERVICE: \n \nSingle or three phase alternating current, approximately 60 hertz, at a single standard delivery voltage with service \nmetered at, or compensated to, that delivery point.  Site-specific requirements will be determined by the Company. \n \nBILLING PARAMETERS: \n \nCustomers served under this service classification shall be billed according to the following parameters: \n \nCustomer Charge - a charge for customer-related services. \n \nIncremental Customer Charge - the incremental cost of metering and meter communications equipment necessary to \nadminister this Standby Service. \n \nContract Demand Charge - a reservation charge for the use of the Company's local distribution system. \n \nAs Used On-peak Daily Demand Charge - a daily usage demand charge for the maximum use of the Company's \ndelivery system during on-peak hours (as defined in the Determination of Contract Demand section of SC-7). \nAs Used Super-peak Daily Demand Charge – a daily usage demand charge for the maximum use of the Company’s \ndelivery system during super-peak hours (as defined in the Determination of Contract Demand section of SC-7). \n \nElectricity Supply Service Charge - a charge for the electricity supply service (Commodity) provided to the \ncustomer. \n \nSurcharges and Adjustments - a set of itemized charges for specific adjustments as provided under the otherwise \napplicable service classification. \n \nRATES: \n \nRates are established on a calendar month basis and will only be prorated if the billing period is less than 25 days or \nmore than 35 days."},{"page":203,"startToken":48557,"endToken":48803,"text":"Issued by Sally Librera, President, Syracuse, NY \n \nPSC NO: 220 ELECTRICITY \nLEAF: 421 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 29 \nINITIAL EFFECTIVE DATE: APRIL 1, 2026 \nSUPERSEDING REVISION: 28 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025. \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nApplicable Rates and Charges – Standby Service Customers and Optional Rate Service Customers will be subject to \nthe following SC-7 rates in accordance with their Parent Service Classification if a Standby Service Customer and their \notherwise applicable service classification if an Optional Rate Service Customer. \n \nSERVICE CLASSIFICATION NO. 1 – Residential – Prior to April 1, 2024 \n \nMONTHLY RATE: \nCustomer Charge: \n \n \n \n$17.33 \n \n \nMetering and Communications/Incremental Customer Charge \n \nAll Load Zones  \n \n \nLeaf No. 429 (A-E) \n \nContract Customer Demand Charge: \nDistribution Delivery \n \n \n \n$28.81 \n \nAs Used Daily Energy Charge, Per kWh: \nDistribution Delivery \n \n \n \n$0.2448 \n \nSERVICE CLASSIFICATION NO. 1 – Residential – Beginning April 1, 2024 \n \nMONTHLY RATE: \nCustomer Charge: \n \n \n \n$19.00 \n \n \nMetering and Communications/Incremental Customer Charge \n \nAll Load Zones  \n \n \nLeaf No. 429 (A-E) \n \nContract Demand Charge, per kW: \nDistribution Delivery \n \n \n \n$6.29 \n \nAs Used On-peak Daily Demand Charge, Per kW: \nDistribution Delivery \n \n \n \n$0.3600 \n \nAs Used Super-peak Daily Demand Charge, per kW \nDistribution Delivery \n \n \n \n$0.7640 \n \nSC-7 customer’s billed under Parent Service Classification No. 1 rates shall have the determination of their Contract \nDemand (kW) and As Used Daily Demand (kW) based on a 60-minute integrated metered demand, which shall be \ndetermined as the sum of the four 15-minute intervals in an hour."},{"page":204,"startToken":48803,"endToken":49006,"text":"Issued by Sally Librera, President, Syracuse, NY \n \nPSC NO: 220 ELECTRICITY \nLEAF: 421.1 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 5 \nINITIAL EFFECTIVE DATE: APRIL 1, 2026 \nSUPERSEDING REVISION: 4 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025. \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n  \n \nSERVICE CLASSIFICATION NO. 2 Non-Demand – Prior to April 1, 2024 \n \nMONTHLY RATE: \nCustomer Charge: \n \n \n \n$21.02 \n \n \nMetering and Communications/Incremental Customer Charge \n \nAll Load Zones  \n \n \nLeaf No. 429 (A-E) \n \nContract Customer Charge \nDistribution Delivery \n \n \n \n$22.36 \n \n \nAs Used Daily Energy Charge, Per kWh: \nDistribution Delivery \n \n \n \n$0.2751 \n \nSERVICE CLASSIFICATION NO. 2 Non-Demand – Beginning to April 1, 2024 \n \nMONTHLY RATE: \nCustomer Charge: \n \n \n \n$25.00 \n \n \nMetering and Communications/Incremental Customer Charge \n \nAll Load Zones  \n \n \nLeaf No. 429 (A-E) \n \nContract Demand Charge, per kW \nDistribution Delivery \n \n \n \n$6.93 \n \n \nAs Used On-peak Daily Demand Charge, Per kW: \nDistribution Delivery \n \n \n \n$0.4169 \n \n \nAs Used Super-peak Daily Demand Charge, per kW \nDistribution Delivery                                                    $0.9111 \n \nSC-7 customer’s billed under Parent Service Classification No. 2ND rates shall have the determination of their \nContract Demand (kW) and As Used Daily Demand (kW) based on a 60-minute integrated metered demand, which \nshall be determined as the sum of the four 15-minute intervals in an hour."},{"page":205,"startToken":49006,"endToken":49221,"text":"Issued by Sally Librera, President, Syracuse, NY \n \nPSC NO: 220 ELECTRICITY \nLEAF: 422 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 30 \nINITIAL EFFECTIVE DATE: APRIL 1, 2026 \nSUPERSEDING REVISION: 29 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025. \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nSERVICE CLASSIFICATION NO. 2D  \n \nMONTHLY RATE: \n \nCustomer Charge: \n \n \n \n$65.00 \n \nMetering and Communications/Incremental Customer Charge \n \nAll Load Zones  \n \n \nLeaf No. 429 (A-E) \n \nCustomer will be billed the SC-7 Phase-In Delivery charges below unless the SC-7 Delivery charges are elected in \naccordance with Special Provision M of this SC-7. \n \n \nSC-7 Delivery  \nSC-7 Phase-In Delivery  \nContract Demand Charge, per kW: \nDistribution Delivery \n \n$3.36 \n$4.26 \n \nAs Used On-peak Daily Demand Charges, Per kW: \nDistribution Delivery \n \n$0.6599 \n$0.6511 \n \nAs Used Super-peak Daily Demand Charge, Per kW: \nDistribution Delivery \n$1.1794 \n$0.9108 \n \nSC-7 customer’s billed under Parent Service Classification No. 2D rates shall have the determination of their \nContract Demand (kW) and As Used Daily Demand (kW) based on a 15-minute integrated metered demand. \n \nWhenever Company does not have to supply and maintain a transformer or transformers for such service there shall \nbe a discount of ninety cents per kW per month for each kW of billed demand, applicable to the demand charge \nstated under Contract Demand Charge."},{"page":206,"startToken":49221,"endToken":49523,"text":"Issued by Sally Librera, President, Syracuse, NY \n \nPSC NO: 220 ELECTRICITY \nLEAF: 423 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 31 \nINITIAL EFFECTIVE DATE: APRIL 1, 2026 \nSUPERSEDING REVISION: 30 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025. \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nSERVICE CLASSIFICATION NO. 3 \n \nMONTHLY RATE: \nCustomer Charge: \nDelivery Voltage \n0-2.2 kV  \n2.2-15 kV \n22-50 kV \nOver 60 kV \nDistribution Delivery Charge: \n$870.00 \n$950.00 \n$1,600.00 \n$1,600.00 \n \n \nMetering and Communications/Incremental Customer Charge: \n \nAll Load Zones  \n \nLeaf No. 429 (A-E) \n \nCustomer will be billed the SC-7 Phase-In Delivery charges below unless the SC-7 Delivery charges are elected in \naccordance with Special Provision M of this SC-7. \n \n \nContract Demand Charges, Per kW: \n \nDelivery Voltage \n \n0-2.2 kV \n2.2-15 kV \n22-50 kV \nOver 60 kV \nDelivery for SC-7 Customers \n \n$0.13 \n$0.45 \n$0.00 \n$0.00 \nDelivery for SC-7 Phase-in Customers \n$1.15 \n$1.15 \n$0.09 \n$0.09 \n  \nAs Used On-peak Daily Demand Charges, Per kW: \n \nDelivery Voltage \n \n0-2.2 kV \n2.2-15 kV \n22-50 kV \nOver 60 kV \nDelivery for SC-7 Customers \n \n$0.6209 \n$0.5277 \n$0.1753 \n$0.1753 \nDelivery for SC-7 Phase-in Customers \n$0.6271 \n$0.5455 \n$0.1892 \n$0.1892 \n \nAs Used Super-peak Daily Demand Charges, Per kW: \n \nDelivery Voltage \n \n0-2.2 kV \n2.2-15 kV \n22-50 kV \nOver 60 kV \nDelivery for SC-7 Customers \n \n$1.1306 \n$0.9727 \n$0.3245 \n$0.3245 \nDelivery for SC-7 Phase-in Customers \n$0.8819 \n$0.7680 \n$0.2638 \n$0.2638 \n \nSC-7 customer’s billed under Parent Service Classification No. 3 rates shall have the determination of their Contract \nDemand (kW) and As Used Daily Demand (kW) based on a 15-minute integrated metered demand. \n \n \nReactive Demand Charges: \n \nAll Delivery Voltages: $0.85 for each chargeable RkVA of lagging reactive demand."},{"page":207,"startToken":49523,"endToken":49827,"text":"Issued by Sally Librera, President, Syracuse, NY \n \nPSC NO: 220 ELECTRICITY \nLEAF: 424 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 31 \nINITIAL EFFECTIVE DATE: APRIL 1, 2026 \nSUPERSEDING REVISION: 30 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025. \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nSERVICE CLASSIFICATION NO. 3A \n \nMONTHLY RATE: \nCustomer Charge: \nDelivery Voltage \n0-2.2 kV \n2.2-15 kV \n22-50 kV \nOver 60 kV \nDistribution Delivery Charge: \n$4,150.00 \n$4,150.00 \n$5,100.00 \n$10,350.00 \n \nMetering and Communications/Incremental Customer Charge: \n \nAll Load Zones  \n \nLeaf No. 429 (A-E) \n \nCustomer will be billed the SC-7 Phase-In Delivery charges below unless the SC-7 Delivery charges are elected in \naccordance with Special Provision M of this SC-7. \n \n \nContract Demand Charges, Per kW: \n \nDelivery Voltage \n \n0-2.2 kV \n2.2-15 kV \n22-50 kV \nOver 60 kV \nDelivery for SC-7 Customers \n \n$0.56 \n$0.56 \n$0.00 \n$0.66 \nDelivery for SC-7 Phase-in Customers \n$1.17 \n$1.17 \n$0.14 \n$0.60 \n \n \nAs Used On-Peak Daily Demand Charges, Per kW: \nDelivery Voltage \n \n0-2.2 kV \n2.2-15 kV \n22-50 kV \nOver 60 kV \nDelivery for SC-7 Customers \n \n$0.5819 \n$0.5819 \n$0.1956 \n$0.1575 \nDelivery for SC-7 Phase-in Customers \n$0.6121 \n$0.6121 \n$0.2097 \n$0.1801 \n \nAs Used Super-peak Daily Demand Charges, Per kW: \nDelivery Voltage \n \n0-2.2 kV \n2.2-15 kV \n22-50 kV \nOver 60 kV \nDelivery for SC-7 Customers \n \n$1.0825 \n$1.0825 \n$0.3612 \n$0.3096 \nDelivery for SC-7 Phase-in Customers \n$0.8624 \n$0.8624 \n$0.2925 \n$0.2561 \n \nReactive Demand Charges: \n \nAll Delivery Voltages: $1.02 for each chargeable RkVA of lagging reactive demand. \n \nSC-7 customer’s billed under Parent Service Classification No. 3A rates shall have the determination of their \nContract Demand (kW) and As Used Daily Demand (kW) based on a 15-minute integrated metered demand."},{"page":208,"startToken":49827,"endToken":50227,"text":"Issued by Sally Librera, President, Syracuse, NY \n \nPSC NO: 220 ELECTRICITY \nLEAF: 425 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 26 \nINITIAL EFFECTIVE DATE: MARCH 1, 2026 \nSUPERSEDING REVISION: 25 \nSTAMPS: Issued in Compliance with Order in Cases 14-M-0094, 18-M-0084, 25-M-0248, and 25-M-0249, dated \nNovember 14, 2025. \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nElectricity Supply Service: \nAll Standby Service Customers and Optional Rate Service Customers taking supply service from the Company, with \nthe exception of SC7 customers whose otherwise applicable service class is SC1 or SC2 (Non Demand), will be \nbilled for commodity service based on their actual hourly usage and the hourly day-ahead market prices as described \nin Rule 46.1.3 herein. SC7 customers whose otherwise applicable service class is SC1 or SC2 (Non Demand) will be \nbilled for commodity service per Rule 46.1.1 until April 30, 2025, after which these customers will be billed based \non their actual hourly usage and hourly day-ahead market prices per Rule 46.1.3.  \n \nCompany supplied Electricity Supply Service charges shall be set according to the market price of electricity \ndetermined in accordance with Rule 46.1, Electricity Supply Cost. \n \nCustomers served under SC-7 are also eligible to participate in Rule 39 - Retail Access Program. \n \nWholesale Generators receiving Station Power service from the NYISO in accordance with Special Provision J shall \nreceive Electricity Supply Service from the NYISO and shall be exempt from Electricity Supply Service charges \nunder Rule 46.1. \n \nSURCHARGES AND ADJUSTMENTS \n \nCustomers served under SC-7 may be subject to the following surcharges and adjustments: \n \nRule 32.2 - Municipal Undergrounding Surcharge \nRule 40 - Value of Distributed Energy Resources’ Customer Benefit Contribution Charge \nRule 40.3 - Value of Distributed Energy Resource (VDER) Value Stack Cost Recovery Surcharge \nRule 41 - System Benefits Charges \nRule 42 - Merchant Function Charge \nRule 43 - Transmission Revenue Adjustment \nRule 45 - Non-Wires Alternative Surcharge  \nRule 46 - Supply Service Charges \nRule 49 - Earnings Adjustment Mechanism \nRule 50 - Reliability Support Services Surcharge \nRule 52 - Electric Vehicle Make-Ready Surcharge \nRule 56 - Energy Storage Surcharge \nRule 57 - Revenue Decoupling Mechanism \nRule 59 - Arrears Management Program Recovery (AMP) Surcharge \nRule 64 - Dynamic Load Management (DLM) Surcharge \nRule 67 - Rate Adjustment Mechanism (RAM) \nRule 68 - Other Delivery Surcharges (ODS) \nRule 73 - Proactive Planning Surcharge \n \nMINIMUM CHARGE: \nCustomers served under SC7 shall be subject to a minimum Charge which shall be the Customer Charge, the \nIncremental Customer Charge (where applicable), and the Contract Demand Charge."},{"page":209,"startToken":50227,"endToken":50778,"text":"Issued by Rudolph L. Wynter, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 426 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 1 \nINITIAL EFFECTIVE DATE: JANUARY 1, 2024 \nSUPERSEDING REVISION: 0 \nSTAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023. \n \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nINCREASE IN RATES AND CHARGES: \nThe rates and charges under this Service Classification, including the Minimum Charge, will be increased by a tax \nfactor pursuant to Rule 32. \n \nTERMS OF PAYMENT: \nBills are due and payable when rendered.  Full payment must be received on or before the date shown on the bill to \navoid a late payment charge pursuant to Rule 26.4. \n \nTERM: \n \nOne year from commencement of service hereunder and continuously thereafter until permanently canceled by the \ncustomer upon 90 days' prior notice to the Company. \n \nDETERMINATION OF CONTRACT DEMAND: \n(1.a) \nContract Demand for Standby Service Customers: \n \n \n \nContract Demand shall initially be set at the maximum anticipated demand of the customer \nincluding any load that is not isolated pursuant to Rule 1.48 codified in a Standby Service Application and \ndetermined as the greater of the following and the Company shall inform the customer of the resultant \ncontract demand ten (10) days prior to the next billing cycle: \n \n \n \n(i) \nthe maximum demand from the Company's system over the previous 12-months, or \n \n \n(ii) \nthe customer's maximum load supplied by all sources including the OSG and Company's \nsupply system over the previous 12-months. \n \n \n \n \n \nIn the case of a new customer (i.e., a customer for whom historical consumption data does not \nexist) the Contract Demand shall be the maximum anticipated demand of load consumed as a National \nElectrical Code calculation in effect based upon the electrical equipment to be served. \n \n \n \nThe Contract Demand shall automatically be increased to the highest measured demand in any \nbilling period during the term hereunder. \n \n \n \nThe Contract Demand of a Wholesale Generator who is connected to a customer which would \notherwise be served directly by the Company shall be set at the maximum potential demand of the station \nloads of the Wholesale Generator when the generator is out of service plus the maximum potential demand \nof the customer connected to the Wholesale Generator. \n \n \n \nThe Contract Demand may be increased based upon a written notice by the customer to the \nCompany at any time. \n \n \n \nThe Contract Demand as determined above may be reduced based upon a written notice by the \ncustomer to the Company and may be reduced no more than one time in a 365-day period and/or 365 days \nfrom any increase or ratchet in Contract Demand. In the event the customer’s Contract Demand is reduced \nthereafter and the recorded maximum demand at any time exceeds the customer's nominated and effective \nContract Demand: (i) by 20% or greater than a penalty equal to the product of 24 times the Contract \nDemand rate times the demand in excess of the Contract Demand shall apply, (ii) by 10% or greater, but \nless than 20%, then a penalty equal to the product of 18 times the Contract Demand rate times the demand \nin excess of the Contract Demand shall apply,  (iii) by less than 10% then a penalty equal to the product of \n12 times the Contract Demand rate times the demand in excess of the Contract Demand shall apply."},{"page":210,"startToken":50778,"endToken":51181,"text":"Issued by Rudolph L. Wynter, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 427 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 2 \nINITIAL EFFECTIVE DATE: JANUARY 1, 2024 \nSUPERSEDING REVISION: 1 \nSTAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023. \n \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nDETERMINATION OF DEMAND: (Continued) \n \n \nSeasonal or other temporary fluctuations in load of the customer's existing facilities such as heating and air \nconditioning, and temporary reductions in manufacturing shall not qualify for reductions in the Contract \nDemand.    \n \n \nThe effective date of the revised Contract Demand shall be the next billing cycle following the Company's \nreceipt of the customer's written notice provided such notice is received 10 business days prior to the first \nday of the next billing cycle. \n \n(1.b) \nContract Demand for Optional Rate Customers \n \nContract Demand will be established initially as the customer’s maximum measured demand during the \nfirst billing period under SC-7.  Thereafter, the Contract Demand shall automatically be increased to the \nhighest measured demand in any billing period during the term hereunder.  In the event the customer has \ninstalled energy efficient equipment or has altered the operation of their service such that the maximum \npotential demand at the premise is less than the Contract Demand, the customer may request a \nreconsideration of the Contract Demand by the Company.  Any reduction of the Contract Demand will be \nat the Company’s discretion. \n \n(2) \nAs-Used On-peak Daily Demand \n \n     \nThe As-Used On-peak Daily Demand shall be the aggregate of the highest daily 15-minute integrated \ndemand (measured in kW) occurring during the on-peak hours of each day during the billing period, except \nfor customers of parent service classification is SC1 or SC2 Non-Demand it shall be the aggregate of the \nhighest 60-minute integrated demand (measured in kW) during the on-peak hours of each day during the \nbilling period.   \n \n \nOn-Peak hours are defined as follows: \n \nDuring the months of October through May, for the hours between 8:00 am and l0:00 pm, Mondays \nthrough Fridays, excluding holidays.  During the months of June through September, for the hours between \n8:00 am and 1:00 pm and 6:00 pm through 10:00 pm, Mondays through Fridays, excluding holidays.  For \nthis purpose, the holidays are specified as New Year's Day, Memorial Day, Independence Day, Labor Day, \nThanksgiving Day, and Christmas Day, when such holidays fall on other than a Saturday or Sunday.  All \nother hours are defined as Off-peak."},{"page":211,"startToken":51181,"endToken":51377,"text":"Issued by Rudolph L. Wynter, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 427.1 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 0 \nINITIAL EFFECTIVE DATE: JANUARY 1, 2024 \nSUPERSEDING REVISION: \nSTAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023. \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nDETERMINATION OF DEMAND: (Continued) \n \n(3) \nAs-Used Super-peak Daily Demand \n \n \nThe As-Used Super-peak Daily Demand shall be the aggregate of the highest daily 15-minute integrated \ndemand (measured in kW) occurring during the Super-peak hours of each day during the billing period,  \nexcept for customers of parent service classification is SC1 or SC2 Non-Demand it shall be the aggregate \nof the highest 60-minute integrated demand (measured in kW) during the on-peak hours of each day during \nthe billing period.   \n \n \nSuper-peak hours are defined as follows: \n \nDuring the months of June through September, for the hours between 1:00pm and 6:00 pm, Mondays \nthrough Fridays, excluding holidays as defined in (2) above. \n \n \n(4) \nThe Reactive Demand  \n \n \nThe Reactive Power Demand Charge shall be the highest average kilovolt-ampere of lagging reactive \ndemand measured in a 15 minute interval during the month less one-third of the highest kilowatt demand \nmeasured during the month."},{"page":212,"startToken":51377,"endToken":51786,"text":"Issued by Sally Librera, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 428 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 5 \nINITIAL EFFECTIVE DATE: SEPTEMBER 1, 2025 \nSUPERSEDING REVISION: 3 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025. \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nINTERCONNECTION REQUIREMENTS SPECIFIC TO STANDBY SERVICE: \n \n \nThe facility may be connected for parallel operation with the service of the Company, or isolated for \noperation with standby service provided by a Wholesale Generator by means of a double throw transfer switch or \ntransfer switching scheme acceptable to the Company. \n \n \nCustomers with an on-site generator are required to execute an SIR Contract.  Customers without an on-site \ngenerator are not required to execute an SIR Contract. \n \n \n \nFor parallel generator installations, the customer and the Company shall agree as to the operating mode, \ninterconnection and equipment specifications as set forth in Specifications for Electrical Installations Supplement, \nElectric System Bulletin Nos. 756A or 756B as applicable and as amended from time to time, which is subject to \nCommission review and arbitration should a dispute arise.  \n \n \nThe following provision shall not apply to Wholesale Generators that agree to pay for actual interconnection \ncosts in the SIR Contract or other agreements with the Company.  The customer shall agree to pay for all \ninterconnection costs which exceed the costs ordinarily incurred in rendering service at the same Contract Demand \nunder the applicable Service Classification.  Upon a mutual agreement the customer may select from the following \npayment options, provided that upon request, the customer agrees to provide a compensatory letter of credit to the \nCompany: \n \n \n(1) The Company will furnish, own, operate, and maintain all special equipment, in return for which the \ncustomer, or its successors on the site, will pay a monthly charge of 1.5 percent of the total investment costs \nfor the duration of its/their operations on the site, whether or not the equipment is in use. \n \n \n(2) The customer will furnish, own, and operate all special equipment on their property and the Company will \nmaintain such equipment, in return for which the customer, or its successors on the site, will pay a 9 percent \nannual operating charge based upon the customer's total investment in such interconnection equipment. \n \n \n \n(3) The customer will furnish, own, operate and maintain all special equipment on their property  \n \nprovided that the equipment and maintenance are suitable for interconnected operations.  Such equipment \nshall be made available for Company inspection as may reasonably be required."},{"page":213,"startToken":51786,"endToken":52317,"text":"Issued by Rudolph L. Wynter, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 429 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 3 \nINITIAL EFFECTIVE DATE: SEPTEMBER 1, 2025 \nSUPERSEDING REVISION: 1 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025. \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nMETERING AND COMMUNICATIONS/INCREMENTAL CUSTOMER CHARGE \n \nA. \nInterval Metering:  All Standby Service Customers and Optional Rate Customers shall utilize the \nCompany's interval recording meter at the customer Premises.  Where an interval-recording meter does not exist and \nmust be installed, the Standby Service Customer shall be responsible for all metering and installation costs not \notherwise covered by New York State Research and Development Authority (NYSERDA).  The metering costs are a \nfunction of the individual customer's electric service.  Metering and installation cost estimates are available from \nCompany representatives. The Standby Service Customer is responsible for the actual costs incurred.  Customers \nwho have already installed the requisite interval recording meters as of the effective date of SC7 will not be subject \nto incremental metering costs.  \n \nOptional Rate Customers who do not already have interval metering installed will be required to have installed an \ninterval meter at the customer Premises and will be subject to an incremental customer charge of $25.10/month, \nwhich is inclusive of the cost of required telecommunications.  Optional Rate Customers will no longer be subject to \nthe incremental customer charge once AMI meters are implemented for the customer’s otherwise applicable service \nclass. \n \nStandby Service Customers and Optional Rate Customers may not opt out of AMI interval meters when such meters \nare implemented for the customer’s parent service classification. \n \nB. \nTelecommunications:  Remote meter reading capability is also required for all Standby Service Customers \nand Optional Rate Service Customers. The Standby Service Customer will be responsible for all costs associated \nwith providing the telecommunications to the meter. The customer may choose to either: \n  \n \n1) provide the Company access to a direct-dial, voice-grade, Public Switched Telephone Network analog \nconnection to the meter, subject to Company approval, to be used exclusively for meter reading functions; \nor  \n \n2) have the Company provide communications to the meter at a cost to the customer including applicable \noverhead. \n \nStandby Service Customers who have already installed the requisite remote meter reading capability as of the \neffective date of SC-7 will not be subject to incremental metering costs.  \n \nC. \nCustomer-Provided Equipment: Customers providing a telephone connection to the meter will bear all costs \nassociated with the installation, operation and maintenance of the telephone line including, but not limited to, all \ntelephone service bills. \n \nIn cases where the Company is unable to read the meter through a customer-provided telephone line, and the \nCompany has determined that the problem is not caused by the Company's meter or equipment, the customer will be \nresponsible to resolve the problem with its telephone provider and will be responsible to reimburse the Company for \nexpenses incurred for visits to the meter location in its efforts to resolve the problem. \n \nD. \nCompany-Provided Equipment: Customers who choose the Company-provided meter reading \ncommunication option shall pay a monthly Incremental Customer Communications Charge as set forth in a schedule \nprovided by the Company.  Company-provided communications will be used exclusively for meter reading \nfunctions."},{"page":214,"startToken":52317,"endToken":52763,"text":"Issued by Rudolph L. Wynter, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 430 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 1 \nINITIAL EFFECTIVE DATE: JANUARY 1, 2024 \nSUPERSEDING REVISION: 0 \nSTAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023. \n \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nMETERING AND COMMUNICATIONS/INCREMENTAL CUSTOMER CHARGE (Continued) \n \nE. Exceptions for Customers Smaller Than 50 kW: In addition, customers who would otherwise receive \nservice under S.C. No. 2 Demand, who have Standby Contract Demands less than 50 kW will have the option of \ntaking service at either (i) the otherwise applicable demand rate and shall not be subject to any additional metering \nand communication charges under S.C-7; or (ii) upon installation of required interval metering, the demand rate set \nforth under S.C.-7. \n \nSPECIAL PROVISIONS \n \nA. \nContract Demands Larger than 1000 kW: All Standby Service Customers with Contract Demands \ngreater than 1000 kW applying for Service under this Service Classification are required to provide the Company \nwith an annual schedule of OSG maintenance by October of the preceding year for each subsequent year.  This \nschedule will be provided at the time of subscription to this Service Classification and will be utilized for planning \nfunctions. Schedules must include starting and ending times for all planned outages.  Customers will be allowed to \nupdate their schedules one month prior to their effective dates.  After this time has passed, no modifications will be \nallowed to the schedules, unless Company approval is granted.  This provision does not take precedence with respect \nto any OSG maintenance provision in a power purchase agreement which may be in place with the Company. \n \nB. \nSC-4 Customers: Customers who would otherwise receive service under the provisions of Service \nClassification No. 4 shall have their demand measured on an integrated 30-minute basis, pursuant to the terms of \nthat tariff.  \n \nC. \nCompliance with Reliability Criteria: Standby Service Customers agree to comply with any existing or \nfuture criteria, guidelines, and procedures established by the North American Electric Reliability Council (or its \nsuccessor) to ensure the continued reliability of North America's interconnected secured transmission electric \nsystems. \n \nD. \nElectrically Isolated Loads: In the event that any customer elects to Electrically Isolate (as defined in Rule \n1.48) some or all of the facilities at the Customer's Location and to thereafter serve such facilities with electricity \nfrom on-site generation without connection to the Company's system, the isolated portion of that customer's load \nwill not be subject to SC-7 provided that the customer executes an agreement with the Company that provides for \nthe following: \n \nThe Company will be entitled to inspect the electrical configuration of such facilities upon a customer's request for \nthis exemption."},{"page":215,"startToken":52763,"endToken":53095,"text":"Issued by Rudolph L. Wynter, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 431 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 1 \nINITIAL EFFECTIVE DATE: JANUARY 1, 2024 \nSUPERSEDING REVISION: 0 \nSTAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023. \n \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nSPECIAL PROVISIONS: \n \nD. \n(Continued) \n \nIf at any time, the Company has a reasonable suspicion that such facilities have not remained isolated from the \nCompany's system, the Company is authorized to inspect the electrical configuration of such facilities. \n \nIf the Company discovers, through billing data and/or the inspection of the customer's facilities, that any of the \nfacilities for which an isolation exemption had been applied have been reconnected to the Company's system, the \nCompany will back bill the customer for the isolated load under SC7 from the effective date of the customer's \nreconnection, including applicable interest and penalties.  Such back billing will be computed in the same manner as \ndescribed under Special Provision E. \n \nE.  \nPenalties for Reconnecting Isolated Loads without Notice: Notwithstanding any other provision of this \nTariff, in the event that the customer connects on-site generation to its electric system without: (1) notifying the \nCompany; and (2) executing Form “G”, and in the event that the Company thereafter discovers that fact, the Company \nshall back-bill the customer for all service rendered subsequent to the estimated installation of such on-site generation.   \n \nIn preparing such back-bills, the Company shall assess a Contract Demand Penalty Provision equal to 2 times that \nwhich would otherwise be computed under Determination of Demand Provision of SC-7 and assume the Contract \nDemand had been set at 0 kW.  If the customer fails to pay the undisputed portion of any such back-bill within the time \nfor payment of bills established in SC-7, the Company shall be authorized to exercise all of its rights in cases involving \ntheft of service, including without limitation its rights under Rule 13.3 (a)(2) of the Commission Rules and Rule 14.4 of \nthis Tariff."},{"page":216,"startToken":53095,"endToken":53294,"text":"Issued by Sally Librera, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 432 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 22 \nINITIAL EFFECTIVE DATE: APRIL 1, 2026 \nSUPERSEDING REVISION: 21 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025.  \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nSPECIAL PROVISIONS: \n \nF. \nReduced Customer Charge for Certain Wholesale Generators \n \n \nSC-7 customers who are Wholesale Generators who: \n \n \n(a) \nhave a parent service classification of SC-3 or SC-3A and are served at the subtransmission or \ntransmission voltage level and \n \n(b) \nhave paid for all of their interconnection facilities as defined in the applicable filed SIR Contract \n(or have arranged for payment by an entity other than the Company) and metering equipment, and \npay the Company ongoing operation and maintenance costs for that equipment (or have arranged \nfor payment by an entity other than the Company) shall pay a customer charge in lieu of the \notherwise applicable customer charge, equal to the following: \n \n \n \nSC-3 Customer Charge \n \nSub-Transmission \nTransmission \n \nDelivery Voltage \n22-50 kV \nOver 60 kV \n \nDistribution Delivery Charge: \n$1,210.68 \n$1,210.68 \n \n \n \nSC-3A Customer Charge \n \n \nSub-Transmission \nTransmission \n \nDelivery Voltage \n22-50 kV \nOver 60 kV \n \nDistribution Delivery Charge: \n$4,136.07 \n$8,166.00"},{"page":217,"startToken":53294,"endToken":53414,"text":"Issued by Rudolph L. Wynter, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 433 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 6 \nINITIAL EFFECTIVE DATE: JANUARY 1, 2024 \nSUPERSEDING REVISION: 5 \nSTAMPS: Issued in Compliance with Order in Case 15-E-0571, dated October 13, 2023. \n \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nSPECIAL PROVISIONS: \n \nG. \nBilling for Customers With OSG’s Less Than or Equal to 15% of Maximum Potential Demand:  \n \nStandby Service Customers that install an OSG after December 31, 2011 with a total nameplate rating that is 15% or \nless of their maximum potential demand over the previous 12 months shall be subject to the delivery charges of their \notherwise applicable service classification and shall not be subject to the delivery charges of SC-7."},{"page":218,"startToken":53414,"endToken":53591,"text":"Issued by Rudolph L. Wynter, President, Syracuse, NY \nPSC NO:  220 ELECTRICITY \nLEAF: 434 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 5 \nINITIAL EFFECTIVE DATE: FEBRUARY 1, 2022 \nSUPERSEDING REVISION: 3 \nSTAMPS: Issued in Compliance with Order in Case 20-E-0380, issued January 20, 2022. \n \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nSPECIAL PROVISIONS: \n \nH. \nWaiver of Reactive Demand Charges for Wholesale Generators Larger Than 25 MVA and With \nAutomatic Voltage Control: For customers who operate a Wholesale Generator in larger than 25 MVA and install \nautomatic voltage control (AVC) at their facilities, reactive demand charges shall be waived, within the parameters \ndefined by the Company during the period in which such AVC is operating and maintained in good working order.  \nThe Company shall not waive start-up reactive demand charges. The initial parameters will be determined by the \nCompany and may be changed subject to system conditions and location of the generating unit.  The waiver is \nsubject to the Company's rights to periodically review and approve the customer's AVC system and review its \noperation and performance for compliance with the system requirements."},{"page":219,"startToken":53591,"endToken":54085,"text":"Issued by Rudolph L. Wynter, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 435 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 5 \nINITIAL EFFECTIVE DATE: JANUARY 1, 2024 \nSUPERSEDING REVISION: 4 \nSTAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023. \n \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \nI. \nA Standby Service Customer with a private generating facility connected to the Company’s distribution \nsystem at primary voltage level or above may use the output of the generating facility to supply two or more \nStandby Service accounts, if all of the following conditions are met: \n(a)  \nEligibility: \n \n(1) Standby Service Accounts \n \n(i) \nThe Standby Service accounts designated by the customer and the account associated \nwith export of the generating facility must be all established in a single customer’s name (“Single \nParty Offset”); or \n(ii) \nThe generating facility and the standby service accounts designated by the customer to \nreceive the output of the generating facility may be established in two or more customer names \n(“Multi-Party Offset”), provided the following conditions are met: \n(1)  \nAt least one of the standby service accounts must be in the same customer name \nas the owner or operator of the generating facility (the “Sponsor”) and have a contract \ndemand equal to 10 percent or more of the nameplate rating of the generating facility. \n(2) \nThe Sponsor will be responsible for coordinating the interconnection and \noperation of the generating facility with the Company, and \n(3) \nAt the time of application under the Multi-Party Offset, the Sponsor must \nsubmit signed Multi-Party Offset Recipient Participation Forms for all Recipient \nAccounts and a signed Multi-Party Offset Percentage Allocation Form. \n \n(2) \nThe generating facility must: (i) have a total nameplate rating of over 5 MW but no more than 20 \nMW; and (ii) meet eligibility criteria for designation as efficient “combined heat and power” pursuant to \nthe order of the Public Service Commission, dated January 23, 2004, in Case 02-E-0781, except with \nrespect to maximum generating capacity.  The generating facility may have more than one generating unit \nso long as the aggregate nameplate rating conforms to the limitations in (2) (i) herein.  \n(3) \nThe generating facility and the Standby Service accounts must all be located within a single \n“premises.”  “Premises” is defined as follows for purposes of this Special Provision I only: \n(i.) \nUnder Single Party Offset, “premises” means “a parcel of land; or more than one building \nand/or parcel of land proximate to each other if there is common use, whether or not such \nbuildings or parcels are separated by public or private roads.” The accounts of a customer whose \nbuildings or parcels of land are not physically interconnected may meet the definition of a single \n“premises” upon the customer’s demonstration of common use to the Company.  \n(ii.) \nUnder Multi-Party Offset, “premises” means “either (i) a single building or (ii) multiple \nbuildings in which each customer is connected to the generating facility by a private thermal loop \nthat delivers steam, hot water, or chilled water.”"},{"page":220,"startToken":54085,"endToken":54444,"text":"Issued by Rudolph L. Wynter, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 436 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 6 \nINITIAL EFFECTIVE DATE: JANUARY 1, 2024 \nSUPERSEDING REVISION: 5 \nSTAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023. \n \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \n(4) \nAt least one of the Standby Service accounts must take service under secondary or primary voltage \nlevels. \n(5)  \nEach Standby Service account must be separately interval metered.  The export of the generating \nfacility must also be separately interval metered.  Metering requirements will be in accordance with the \nMetering and Communications of this Service Classification. \n(6)  \nA customer may take service under SC-6 if the export of the generating facility exceeds the \naggregate kWh usage on the Standby Service accounts.  The Customer must apply for service under SC6 \nand meet the eligibility requirements as specified therein. \n(7)  \nThe communications service for the account associated with the generating facility’s export and \nfor each Standby Service account must be provided and maintained at customer’s expense pursuant to the \nMetering and Communications/ contained in SC-7, and must be operational before the customer may take \nservice under this Special Provision I. \n(b)  \nInterconnection: \nThe interconnection of the facilities will be subject to the interconnection requirements specified in Interconnection \nRequirements of this Service Classification. In addition, the interconnection must be technically and economically \npracticable, and the connection and operation of such facility shall not jeopardize the safety or operation of the \nCompany’s system, facilities or other Customers. \n(c) Accounts Supplied by the Generating Facility’s Output: \n(1)  \nEach account must opt in to Optional Rate Service, or otherwise be on Standby Service, to be \neligible for service under this Special Provision I. \n(2)  \nThe customer’s accounts must be either served by the Company or take service from an alternative \nenergy supplier/ESCO as described in Rule 39 of this tariff.  \n(3)  \nIf the customer does take service from an alternative energy supplier/ESCO, all supply in excess \nof that supplied by the customer’s private generating facility must be supplied by a single ESCO unless the \ncustomer elects to be a Direct Customer as defined in Rule 1.54."},{"page":221,"startToken":54444,"endToken":55032,"text":"Issued by Rudolph L. Wynter, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 437 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 4 \nINITIAL EFFECTIVE DATE: JANUARY 1, 2024 \nSUPERSEDING REVISION: 3 \nSTAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023. \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \n(4)  \nNo account served under this rule may be served under the PASNY Rate Schedule (SC 4, RNY), economic \ndevelopment program specified in General Rule 34, net metering as specified in Rules 36 and 37, or special \nprovision G of this Service Classification. \n(5)  \nCustomers who take service under Special Provision I may not receive Consolidated Billing from the \nCompany (described in Rule 39.10.2). \n(d)  \nContract Demand for each account supplied by the Generating Facility’s Output: The Contract Demand will be \ndetermined for each account under this Special Provision I on an individual basis based on that account’s load and including \nthe delivery of supply from all sources, and in conformance with the  Contract Demand provisions of this Service \nClassification.  \n(e) \n Billing Applicable to Each Account Supplied by the Generating Facility’s Output: \n(1) \nAllocated As-used Generator Demand and Allocated Generator Supply will be determined for each 15-\nminute interval. Adjustments will be made for transformation losses as applicable in accordance with Rule 39.18 of \nthis tariff.  For purposes of this Special Provision, the following definitions apply: \n(i)  \nFor Accounts Supplied Under the Single Party Offset \n“Allocated As-used Generator Demand” means, for each account supplied by the generating facility’s \noutput, the demand registered on the account’s meter(s) multiplied by the lower of: (a) 1 or (b) the ratio of \nthe demand registered on the meter(s) measuring the generating facility’s output to the sum of demands \nregistered on the meters of all Standby Service accounts supplied by the generating facility’s output. \n“Allocated Generator Supply” means, for each account supplied by the generating facility’s output, the \ntotal kilowatt hours registered on the account’s meter(s) multiplied by the lower of: (a) 1 or (b) the ratio of \nthe total kilowatt hours registered on the meter(s) measuring the generating facility’s output to the sum of \nthe kilowatt hours registered on the meters of all Standby Service accounts supplied by the generating \nfacility’s output. \n(ii.) \nFor Accounts Supplied under the Multi-Party Offset \n “Allocated As-used Generator Demand” means, for each Recipient Account, the lower of: (a) the demand \non the Recipient Account’s meter or (b) the demand registered on the meter(s) measuring the generating \nfacility’s output multiplied by the Recipient Account’s Percentage Allocation.  If the generating facility’s \noutput multiplied by the Recipient Account’s Percentage Allocation exceeds the demand registered on the \nRecipient Account’s meter, the excess amount shall not be redistributed to other accounts nor carried \nforward to the succeeding billing period. \n“Allocated Generator Supply” means, for each Recipient Account, the lower of: (a) the total kWh \nregistered on the Recipient Account’s meter(s) or (b) the total kWh registered on the meter(s) measuring \nthe generating facility’s output multiplied by that Recipient Account’s Percentage Allocation.  If the \ngenerating facility’s output multiplied by the Recipient Account’s Percentage Allocation exceeds the kWh \nregistered on the Recipient Account(s) meter(s), the excess amount may be credited to the extent described \nin Special Provision (I)(a)(6) of this Service Classification. \n“Percentage Allocation” means the percentage of the generating facility’s output that the Sponsor has \nallocated to each Recipient Account under the Multi-Party Offset. A single percentage will be applied to \nboth the Allocated As-Used Generator Demand and the Allocated Generator Supply."},{"page":222,"startToken":55032,"endToken":55360,"text":"Issued by Kenneth D. Daly, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 437.1 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 0 \nINITIAL EFFECTIVE DATE:  JANUARY 1, 2017 \nSUPERSEDING REVISION: \nSTAMPS: Issued in accordance with Order in Case 16-M-0430 dated December 19, 2016 \nSERVICE CLASSIFICATION NO. 7 (Continued) \nThe Percentage Allocations must total 100 percent, of which the Sponsor must establish: (a) a Percentage Allocation \nof 10 percent or more to a single Recipient Account in the Sponsor’s name; and (b) a Percentage Allocation of no \nless than 5 percent or more than 90 percent to each additional Recipient Account. The Recipient Accounts and the \nPercentage Allocation to each must be assigned in writing by the Sponsor, using the SC7 Offset Rate Allocation \nRequest Form, at least 30 days before commencing service under the Multi-Party Offset. The Percentage Allocations \nand the Recipient Accounts may be changed, provided the SC7 Offset Rate Allocation Request Form is submitted to \nthe Company no less than 30 days before the Host-Generator Account’s cycle billing date to which the modification \nwill apply. No credits will be applied if the Sponsor ceases to have a Recipient Account or ceases to own or operate \nthe generating facility. If a Recipient Account is closed, its credits will be forfeited unless the Company receives a \nnew Form within 30 days of the account’s closure. \n(2)\nEach account supplied by the generating facility’s output will be billed under Standby Service rates, as\nmodified below:\n(i)\nAn additional Customer Charge of $50.00 per account per billing period, exclusive of the Increase\nin Rates and Charges, will be applicable to cover incremental billing and administrative costs associated\nwith providing service under this provision.\n(ii)\nThe per kWh delivery charges and adjustments  applicable to the customer’s service classification\nwill be applied to the total kilowatt hours registered on the account’s meter(s) reduced by the Allocated\nGenerator Supply, for each 15-minute interval (adjusted for losses as applicable) in the Billing Period."},{"page":223,"startToken":55360,"endToken":55772,"text":"Issued by Kenneth D. Daly, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 437.2 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 0 \nINITIAL EFFECTIVE DATE: JANUARY 1, 2017 \nSUPERSEDING REVISION:  \nSTAMPS: Issued in accordance with Order in Case 16-M-0430 dated December 19, 2016 \n \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n(iii) \nCustomers who take electricity supply service under Rule 46.1.3 shall have their Capacity Tags \nreduced by the maximum of the Allocated As-used Generator Demands in the billing period for purposes of \ncalculating the capacity charge specified in Rule 46.1.3. \n(iv) \nFor each 15-minute interval, the registered demand on the account’s meter(s) will be reduced by \nthe Allocated Generator Demand for purposes of determining the daily maximum demand that is used for \nbilling As-used Daily Demand Delivery Charges. \nv) \nFor any per kW surcharges applicable to the Customer, the otherwise applicable billed demand \nused to calculate the surcharge will be reduced by the maximum of the Allocated As-used Generator \nDemand in the billing period for purposes of calculating the applicable surcharge The customer’s Contract \nDemand shall remain unadjusted for purposes of calculating the customer’s contract demand charge.  \n(vi) \nIf the Customer purchases supply from the Company, the per kWh supply charges and adjustments \ndescribed in this Service Classification under Electricity Supply Service and will be applied to the total \nkilowatt hours registered on the account’s meter(s) reduced by the Allocated Generator Supply, for each \n15-minute interval (adjusted for losses as applicable) in the billing period. \n(3)  \nThe Allocated As-used Generator Demand and Allocated Generator Supply will be assumed to be zero for \ntime periods where there is insufficient interval data available to ascertain that the generating facility supplied output \nto any associated Standby Service account. \nBills may be estimated pursuant to Rule 26.10.2.  If interval data is estimated on a Standby Service account, that \ndata will be used in the calculation of the Allocated As-used Generator Demand for all other accounts.  If actual data \nlater becomes available, the account will be rebilled based on the actual registered demand on the meter less the \npreviously determined allocated As-used Generator Demand for such account. \n(f)  \nThe Customer will be assessed a Reactive Power Demand Charge per kVar registered on the generating facility’s \nexport meter(s) at the time of the kW maximum demand; provided, however, that if the meter registers no kW demand, the \ncharge per kVar will be applied to the highest kVar recorded during the billing period."},{"page":224,"startToken":55772,"endToken":56047,"text":"Issued by Sally Librera, President, Syracuse, NY \n \nPSC NO: 220 ELECTRICITY \nLEAF: 438 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 19 \nINITIAL EFFECTIVE DATE: APRIL 1, 2026 \nSUPERSEDING REVISION: 18 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025. \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nSPECIAL PROVISIONS: \nJ. \nReduced Distribution Delivery Charges for Wholesale Generators Receiving Station Power Service \nfrom NYISO \n \n \nSC7 customers who are Wholesale Generators who: \n \n \n(a) \nare registered customers of the New York Independent Station Operator (“NYISO”) and \n \n(b) \nwho are receiving Station Power under the provisions of the NYISO Market Administration and \nControl Area Services Tariff \n \n \nshall pay the following distribution delivery charges in lieu of the otherwise applicable distribution delivery \ncharges: \n \n \n \nSERVICE CLASSIFICATION NO. 3 \n \nMONTHLY RATE: \n \nContract Demand Charges, Per kW:  \n \nDelivery Voltage \n \n0-2.2 kV \n2.2-15 kV  \n22-50 kV \nOver 60 kV \nDistribution Delivery \n \n$0.13 \n$0.45 \n$0.00 \n$0.00 \n \nAs-Used On-Peak Daily Demand Charges, Per kW: \n \nDelivery Voltage \n \n0-2.2 kV \n2.2-15 kV \n22-50 kV \nOver 60 kV \nDistribution Delivery \n \n$0.3250 \n$0.2135 \n$0.0000 \n$0.0000 \n \nAs-Used Super-peak Daily Demand Charges, Per kW: \nDelivery Voltage \n \n0-2.2 kV \n2.2-15 kV \n22-50 kV \nOver 60 kV \nDistribution Delivery \n$0.5919 \n$0.3936 \n$0.0000 \n$0.0000 \n \n \nSERVICE CLASSIFICATION NO. 3A \n \nMONTHLY RATE: \n \nContract Demand Charges, Per kW: \n \nDelivery Voltage \n \n0-2.2 kV \n2.2-15 kV \n22-50 kV \nOver 60 kV \nDistribution Delivery \n \n$0.56 \n$0.56 \n$0.00 \n$0.66 \n \nAs-Used On-Peak Daily Demand Charges, Per kW: \n \nDelivery Voltage \n \n0-2.2 kV \n2.2-15 kV \n22-50 kV \nOver 60 kV \nDistribution Delivery \n \n$0.2403 \n$0.2403 \n$0.0000 \n$0.0000"},{"page":225,"startToken":56047,"endToken":56474,"text":"Issued by Sally Librera, President, Syracuse, NY \n \nPSC NO: 220 ELECTRICITY \nLEAF: 439 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 6 \nINITIAL EFFECTIVE DATE: APRIL 1, 2026 \nSUPERSEDING REVISION: 5 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025. \n \nSERVICE CLASSIFICATION NO. 7 (CONTINUED) \n \nSPECIAL PROVISIONS: \nJ. \nReduced Distribution Delivery Charges for Wholesale Generators Receiving Station Power Service \nfrom NYISO (Continued) \n \nAs-Used Super-peak Daily Demand Charges, Per kW: \n \nDelivery Voltage \n \n0-2.2 kV \n2.2-15 kV \n22-50 kV \nOver 60 kV \nDistribution Delivery \n \n$0.4470 \n$0.4470 \n$0.0000 \n$0.0000 \n \nK. \nBilling for Customers with EJP Load Not Separately Metered \n \n1. \nCustomers with EJP load not separately metered shall be required to install interval metering \nand telecommunications on their on-site generator(s) in accordance with the Metering and \nCommunications/Incremental Customer Charge provisions of SC-7. \n \n2. \nOnly customers billed at parent rate class SC-2D (50 kilowatts or greater), SC-3, and SC-3A \nare eligible to participate in the EJP program. \n \n3. \nSpecial Provision G of SC-7 shall not apply to customers with EJP load. \n \n4. \nThe customer’s EJP demand and energy available for the EJP discount in each Billing Period \nshall be determined in accordance with Rule 34.7.3.3.2 for EJP.  Customer shall be subject to \nall rates and charges applicable to the Excelsior Jobs Program as provided in Rule 34.  \n \n5. \nCustomer shall be subject to all charges provided in SC-7.  The billing determinants for \ncustomers with EJP qualifying load shall be determined as provided herein. \n \n5.1 \nContract Demand:  The Contract Demand shall initially be set by the Company as the \nmaximum value of the Customer’s monthly Base Year Contract Load in kilowatts \nspecified in the signed EJP contract between the Company and the Customer per Rule \n34.7.3.1.4 and Rule 34.7.3.3.1 for EJP.  The Contract Demand will be automatically \nincreased to the maximum kilowatt demand in a billing period when the maximum \nkilowatt demand in the billing period exceeds the Contract Demand in that billing \nperiod.  The maximum kilowatt demand in a billing period shall be calculated by \nsubtracting the EJP incremental demand available for the EJP discount as determined \nin Rule No. 34.7.3.3.2 for EJP from the metered billing demand (i.e., customer’s load \nnet of generation) on an interval-by-interval basis. The demand shall not be less than \nzero (0) in any interval.  The customer may elect to increase or reduce the Standby \nContract Demand thereafter in accordance with the Determination of Contract Demand \nprovisions of SC7."},{"page":226,"startToken":56474,"endToken":56689,"text":"Issued by Sally Librera, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 439.1 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 2 \nINITIAL EFFECTIVE DATE: SEPTEMBER 1, 2025 \nSUPERSEDING REVISION: 0 \nSTAMPS: Issued in Compliance with Order in Case 24-E-0322, dated August 14, 2025. \n \nSERVICE CLASSIFICATION NO. 7 (CONTINUED) \n \nSPECIAL PROVISIONS: \n \nK. \nBilling for Customers with EJP Load Not Separately Metered (Continued) \n \n5.2 \nAs-Used Daily Demand:  The As-Used Daily Demand shall be the As-Used Daily \nDemand as specified in Determination of As-Used Daily Demand provisions of this SC \nfor both As-Used On-peak Daily Demand and As Used Super-peak Daily Demand, less \nthe product of the demand eligible for the EJP discount in the billing period, as \ndetermined in Rule 34.7.3.3.2 for EJP, and the number of on-peak or super-peak days \nin the billing period, as applicable. \n \n5.3 \nBilling Energy:  Billing Energy in kilowatt-hours for the purposes of applying the \nElectricity Supply Service and Surcharges and Adjustments provisions of SC-7 shall be \ncalculated by subtracting the EJP incremental energy available for the EJP discounts as \ndetermined in Rule 34.7.3.3.2 from the metered billing energy (i.e., customer’s load net \nof generation) on an interval-by-interval basis. The Billing Energy shall not be less \nthan zero (0) in any interval."},{"page":227,"startToken":56689,"endToken":57226,"text":"Issued by Rudolph L. Wynter, President, Syracuse, NY \nPSC NO: 220 ELECTRICITY \nLEAF: 440 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 5 \nINITIAL EFFECTIVE DATE: JANUARY 1, 2024 \nSUPERSEDING REVISION: 4 \nSTAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023. \n \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nSPECIAL PROVISIONS: \n \nL. \nSTANDBY RELIABILITY CREDIT \n \nStandby Service Customers shall be provided an opportunity to earn a Standby Reliability Credit (Credit) against \ntheir Contract Demand Charges.  Beginning January 1, 2024, the Standby Reliability Credit will be phased out over \n5 years and will only be available to SC-7 Phase-In Customers as provided in Special Provision M of SC-7. The \nCredit would be earned when a standby customer reduces their maximum measured demand during the Defined \nMeasurement Period below their established contract demand. To be eligible for the Credit the Customer must have \nan on-site generator and the following must also apply: \n \n \n(1) \nThe generating facility’s output must be separately metered using an output meter that  \n \n \nthe customer arranges to be furnished and installed at the customer’s expense. \n \n(2) \nThe customer, at its expense, must provide and maintain the communications service for   \n \nthe Output Meter. \n \n \n(a) \nThe Output Meter must be Commission-approved revenue grade, with interval   \n \n \nmetering with telecommunications capability. \n(b) \nThe metering must be compatible with the Company’s infrastructure, including \ncompatibility with the Company’s meter reading system and metering communications \nsystems. \n(c) \nAll metering requirements shall be in accordance with Rule 25-Metering. \n(3) \nThe customer may not be receiving Value Stack Compensation per Rule 40.2 for the generating \nfacility’s exports to the system.  \n \n(4)  \nMust not be a stand-alone energy storage system or an energy storage system paired with other \ngenerating technologies that supports customer loads (other than loads directly related to or \nnecessary to support the energy storage system) that are less than or equal to 25 percent of the \nenergy storage system nameplate capacity rating or inverter capability. \n \nFor this Special Provision L, the following definitions apply: \n \n(1) \nThe “Defined Measurement Period” shall be defined as weekdays from 8:00 am to 10:00 pm during the \nprevious two consecutive full Summer periods; provided however, that the first year in which a customer seeks the \nCredit, the Defined Measurement Period is weekdays from 8:00 am to 10:00 pm during the previous full Summer \nperiod only.  The Defined Measurement Period shall exclude Outage Events, as selected by the customer, as well as \nholidays as defined in Rule 1.89.  \n \n(2) \n“Summer period” - For purposes of this Credit, the Summer Period is June 1 through September 30. \n \n(3) \n“Outage Events” shall be defined as up to three (3) time blocks for each Summer Period that, in aggregate, \nare comprised of no more than five 24-hour time periods, excluding weekends and holidays.  If a time block \ncontains a period of less than 24 hours, the period will be rounded up to the next 24 hours (i.e., the 24-hour periods \ncannot be applied on a partial basis).  If a time block encompasses a holiday or weekend, the start of the 24-hour \nperiod on the day prior to the holiday or weekend until the same hour the next business day will be considered to be \na single 24-hour period."},{"page":228,"startToken":57226,"endToken":57588,"text":"PSC NO: 220 ELECTRICITY \nLEAF: 441 \nNIAGARA MOHAWK POWER CORPORATION \nREVISION: 7 \nINITIAL EFFECTIVE DATE: JANUARY 1, 2024 \nSUPERSEDING REVISION: 6 \nSTAMPS: Issued in Compliance with Order in Case 15-E-0751, dated October 13, 2023. \nSERVICE CLASSIFICATION NO. 7 (Continued) \nSPECIAL PROVISIONS: \nL. \nSTANDBY RELIABILITY CREDIT (Continued)\nThe Credit for any Defined Measurement Period will be equal to the difference between the customer’s contract demand in \nkW, and the customer’s highest kW demand recorded on the customer’s interval meter(s) (net of generation), multiplied by \nthe contract demand delivery charge per kW that is in effect on October 1 of the year in which the Credit is determined.  For \nSC-7 Phase-in Customers the rate will be SC-7 Phase-in Contract Demand Rate billed to the customer as of October 1 of the \nyear in which the Credit is determined.  The Credit will be applied to the customer’s successive 12 monthly customer bills \ncommencing in November until the following October. \nA customer seeking the Credit must request such credit by October 14, in writing, of each year for which the reliability credit \nit sought and, at the same time, specify the Outage Events the customer requests to be excluded from the Defined \nMeasurement Period.  If October 14 falls on a weekend or holiday, the Company will accept requests until the next business \nday. \nIf a Standby Customer takes service under SC-7 Special Provision I, the Outage Events for all Recipient Accounts shall be \nthe same and shall be specified by the Sponsor.  Each Recipient Account’s Credit will be calculated individually. \nM. \nSC-7 PHASE-IN CUSTOMERS\nExisting SC-7 customers as of March 16, 2022 will be billed the SC-7 Phase-in delivery charges beginning January 1, 2024, \n(“SC-7 Phase-In Customers”).  SC-7 Phase-in Customers may opt out of the SC-7 Phase-In delivery charges at any time and \nbe billed SC7 delivery charges by providing written notice to the Company, with such transition to SC-7 delivery charges \noccurring in the next billing period thirty days after notice is provided.  Once a customer opts out of the SC-7 Phase-in \ndelivery charges they may not return to billing under the SC-7 Phase-In delivery charge. \nIssued by Rudolph L. Wynter, President, Syracuse, NY"},{"page":229,"startToken":57588,"endToken":57603,"text":"New York State Electric & Gas Corporation \nService Classification 7: Large General Service with \nTime-of-Use Metering"},{"page":230,"startToken":57603,"endToken":58069,"text":"PSC No: 120 - Electricity\nLeaf No. 211\nNew York State Electric and Gas Corporation\nRevision: 1\nInitial Effective Date: September 26, 2010\nSuperseding Revision: 0\nIssued in compliance with Order in Case 09-E-0715 dated September 21, 2010\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7\nAPPLICABLE TO THE USE OF SERVICE FOR:\nLarge General Service (Primary and Secondary) with Time-of-Use Metering for any customer with a billing\ndemand equal to or greater than 500 KW during any two of the previous twelve months and for continuing\nservice thereafter.\nAlso optional for:\nThis option is not available to Service Classification No. 2 customers, effective December 3, 2002.\nCustomers who qualify under the Economic Development Incentive or the Economic Development \"Zone\"\nIncentive Provision of the General Information Section of this Schedule;\nCustomers who qualify under the Controlled Load Service Option of Service Classification No. 3;\nCustomers who qualify under the Agricultural Customers Time-of-Use Service Option of Service\nClassification No. 2.\nNote:\nOther than as set forth above, this service classification is not available to customers otherwise eligible\nfor Residential Service, unless the size and/or nature of the customer's load or its impact on our system\nrequires three phase service.\nCHARACTER OF SERVICE:\nContinuous - Alternating Current, 60 Cycle;\nSecondary Service at 120, 120/208, 120/240, 208, 240, 240/416,\n277/480, or 480 Volts; or\nPrimary (Distribution) Service at 2,400, 4,160, 4,800, 7,200, 8,320, 12,000,\n12,470, 13,200, 34,500 or 46,000 Volts; or\nSubtransmission Service* at 34,500 or 46,000 (Both Non-Regulated) Volts; and 34,500 (Regulated) Volts\nfor \"Grandfathered Customers\" only*; or\nTransmission Service at 115,000 Volts and above.\nSingle or Three Phase. (Characteristics depend upon available circuits and equipment.)\n* Effective September 26, 2010, Subtransmission Service will no longer be available to new service locations.\nHowever, grandfathering at the subtransmission rates contained herein will apply to the service location of the\ncurrent subtransmission class customer, including the site as well as the existing buildings where the customer was\ntaking Subtransmission Service before September 26, 2010. Grandfathering is applicable to any new owner\nacquiring possession of a grandfathered service location, as long as that customer meets the qualification criteria for\ngrandfathered Subtransmission Service above. The grandfathering may apply to facility replacements and or\nexpansions by customers taking grandfathered Subtransmission Service, if accomplished through existing\nsubtransmission metering points at the service location. .\nRATE PERIODS:\nOn-peak hours are defined as the hours between 7:00 A.M. and 10:00 P.M. (Local Time), Monday through\nFriday with the exception of the following holidays: New Year's Day, Memorial Day, Independence Day,\nLabor Day, Thanksgiving Day and Christmas Day. Those hours not designated as on-peak are defined as\noff-peak."},{"page":231,"startToken":58069,"endToken":58318,"text":"PSC No:  120 - Electricity \n \n \nLeaf No. 212 \nNew York State Electric & Gas Corporation \n \n \nRevision:  22 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  20 \nIssued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. \nISSUED BY:   Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: \n \nPursuant to General Information Section 25, Supply Service Options, customers served under this Service \nClassification shall choose from different electric rate choices offered by the Company as described below. The \nCompany shall offer a Retail Access rate choice and Non-Retail Access rate choices as described below. \n \nThe Company shall provide Delivery Service regardless of the customer’s Supply Service Option. \n \n1.  ESCO Supply Service (ESS) \n \nThis Retail Access choice includes fixed charges for NYSEG delivery service and a Transition Charge.  \nSupply Service shall be provided by an Energy Services Company (ESCO).  Customers that elect ESS and \nreceive a Consolidated Bill shall not be subject to the Bill Issuance Charge. \n \nDelivery Service:   \n \nRate: (Per Meter, Per Month) \n \n \n \n \nEffective Date \n \n6/01/2026 \nVOLTAGE SECONDARY \nS.C. 7-1 DISTRIBUTION \n \nCustomer Charge \n \n \n \n$375.00 \nDemand Charge  \nOn-Peak Service \n$14.55 \nReactive Charge  \nReactive kilovolt-ampere hours, per \nbilling reactive kilovolt-ampere hour \n$0.00078 \n  \n \nNon-Bypassable Charge (“NBC”): \n All kWh, per kWh \nSee TCS Statement \n \n Bill Issuance Charge (per bill):   \n    $0.89, as described in General Information Section 16.J \n \nRate Adjustment Mechanism (“RAM”): \n \nAll kW, per kW \nSee RAM Statement, as described in Rule 38"},{"page":232,"startToken":58318,"endToken":58467,"text":"PSC No:  120 - Electricity \n \n \nLeaf No. 213 \nNew York State Electric & Gas Corporation \n \n \nRevision:  20 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  18 \nIssued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. \nISSUED BY:   Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS (CONT'D.): \n \n \n1.  ESCO Supply Service (ESS)  (cont’d) \n \n \nRate: (Per Meter, Per Month) \n \n \nDelivery Service: \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \nNon-Bypassable Charge (“NBC”): \n All kWh, per kWh      \nSee TCS Statement \n \n Bill Issuance Charge (per bill):   \n    $0.89, as described in General Information Section 16.J \n \nRate Adjustment Mechanism (“RAM”): \n \nAll  kW, per kW \nSee RAM Statement, as described in Rule 38 \n \n \nEffective Date \n \n6/01/2026 \nVOLTAGE PRIMARY \nS.C. 7-2 DISTRIBUTION \n \nCustomer Charge \n \n \n \n$1,350.00 \nDemand Charge  \nOn-Peak Service \n$13.76 \nReactive Charge  \nReactive kilovolt-ampere hours, per \nbilling reactive kilovolt-ampere hour \n$0.00078"},{"page":233,"startToken":58467,"endToken":58616,"text":"PSC No:  120 - Electricity \n \n \nLeaf No. 214 \nNew York State Electric & Gas Corporation \n \n \nRevision:  22 \nInitial Effective Date: June 1, 2026  \n \n \nSuperseding Revision:  20 \nIssued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. \nISSUED BY:   Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (CONT'D.) \n \n1.  ESCO Supply Service (ESS)  (cont’d) \n \n \nRate: (Per Meter, Per Month) \n \n \nDelivery Service:   \n \n \n \nEffective Date \nVOLTAGE PRIMARY \nS.C. 7-3 SUBTRANSMISSION \n \n6/01/2026 \nCustomer Charge \n \n \n \n$3,000.00 \nDemand Charge  \nOn-Peak Service \n$3.72 \nReactive Charge  \nReactive kilovolt-ampere hours, per \nbilling reactive kilovolt-ampere \nhour \n \n$0.00078 \n \n \n Non-Bypassable Charge (“NBC”): \n All kWh, per kWh      \n See TCS Statement \n \n Bill Issuance Charge (per bill):   \n    $0.89, as described in General Information Section 16.J \n \nRate Adjustment Mechanism (“RAM”): \nAll kW, per kW \nSee RAM Statement, as described in Rule 38"},{"page":234,"startToken":58616,"endToken":58765,"text":"PSC No:  120 - Electricity \n \n \nLeaf No. 215 \nNew York State Electric & Gas Corporation \n \n \nRevision:  31 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  29 \nIssued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. \nISSUED BY:   Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \n \nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (CONT'D.) \n \n1.  ESCO Supply Service (ESS)  (cont’d) \n \nRate: (Per Meter, Per Month) \n \n \nDelivery Service:   \n \n \nVOLTAGE PRIMARY \nS.C. 7-4 TRANSMISSION \nEffective Date \n6/01/2026 \nCustomer Charge  \n \n \n$5,900.00 \nDemand Charge  \nOn-Peak Service \n$2.07 \nReactive Charge  \nReactive kilovolt-ampere \nhours, per billing reactive \nkilovolt-ampere hour \n$0.00078 \n \n \n Non-Bypassable Charge (“NBC”): \n All kWh, per kWh     \n See TCS Statement \n \n Bill Issuance Charge (per bill):   \n $0.89, as described in General Information Section 16.J \n \nRate Adjustment Mechanism (“RAM”): \n \nAll kW, per kW \n \n \n \nSee RAM Statement, as described in Rule 38"},{"page":235,"startToken":58765,"endToken":58834,"text":"PSC No: 120 - Electricity\nLeaf No. 215.1\nNew York State Electric & Gas Corporation\nRevision: 7\nInitial Effective Date: January 1, 2010\nSuperseding Revision: 6\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (CONT'D.)\n2. Reserved for Future Use\nIssued in compliance with order in Case No. 09-E-0227 dated 09/28/09."},{"page":236,"startToken":58834,"endToken":59024,"text":"PSC No: 120 - Electricity\nLeaf No. 216\nNew York State Electric & Gas Corporation\nRevision: 27\nInitial Effective Date: November 1, 2023\nSuperseding Revision: 25\nIssued in compliance with Order in Case No. 22-E-0317, dated October 12, 2023.\nISSUED BY: Jeremy Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (CONT'D.)\n3. NYSEG Supply Service (NSS)\nThis Non-Retail Access choice includes the same fixed charges for NYSEG Delivery Service as the ESCO\nSupply Service (ESS), a Transition Charge, a commodity charge for electricity supplied by NYSEG which\nfluctuates with the market price of electricity, and a Merchant Function Charge.\nRATE: (Per Meter, Per Month)\nNon-Bypassable Charge (\n:\nAll kWh, per kWh\nSee TCS Statement\nCommodity Service:\nThe charge for Electric Power Supply provided by NYSEG shall fluctuate each month as further described in\nGeneral Information Section 25.I.C., Calculation of the Commodity Charge.\nMerchant Function Charge\nAll kWh, per kWh\nSee Merchant Function Charge Statement\nBill Issuance Charge (per bill):\n$0.89, as described in General Information Section 16.J.\nAll kW, per kW\nSee RAM Statement, as described in Rule 38"},{"page":237,"startToken":59024,"endToken":59308,"text":"PSC No: 120 - Electricity\nLeaf No. 216.1\nNew York State Electric & Gas Corporation\nRevision: 6\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 5\nIssued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (CONT'D.)\n4.\nHourly Pricing\nMandatory and Voluntary\nMandatory\nCustomers with billed demand greater than or equal to 300 kW in any two months within the 12 months.\nA customer taking service under Hourly Pricing shall remain subject to this provision until their monthly metered\ndemand has been less than 300 kW for 12 consecutive months.\nCustomers that received a NYPA allocation on or before December 31, 2006, are exempt from mandatory Hourly\nPricing as set forth under Voluntary Hourly Pricing.\nVoluntary:\nHourly Pricing is voluntary for any customer taking service under Service Classification No. 7 who does not meet\nthe requirements for Mandatory Hourly Pricing set forth above. Once a customer voluntarily elects Hourly\nPricing, they shall remain subject to this provision until their monthly metered demand has been less than 300 kW\nfor 12 consecutive months.\nHourly Pricing is also voluntary to a customer with load supplied by NYPA beginning on or prior to December 31,\n2006, and would have otherwise qualified for Mandatory Hourly Pricing. These customers shall have the following\nSupply Service Options, all described herein, for the non-NYPA load, NSS, ESS, or Hourly Pricing, until the end\nof their participation in the NYPA program at which time they shall be subject to Mandatory Hourly Pricing and\nhave the two supply options ESS or Hourly Pricing, as described below."},{"page":238,"startToken":59308,"endToken":59466,"text":"PSC No: 120 - Electricity\nLeaf No. 217\nNew York State Electric & Gas Corporation\nRevision: 15\nInitial Effective Date: January 1, 2010\nSuperseding Revision: 14\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (CONT'D.)\n4. Hourly Pricing – Mandatory and Voluntary (Cont'd.)\nVoluntary: (Cont’d.)\nAdditionally, Hourly Pricing is voluntary to a customer that is participating in any of the Company’s Economic\nIncentives that received the Economic Incentive beginning on or prior to December 31, 2006, and would have\notherwise qualified for Mandatory Hourly Pricing until the term of the customer’s Economic Incentive expires.\nThe customer must choose the same Supply Service Option for its incentive, non-incentive load and any future\nload. Upon the conclusion of their participation in the Economic Incentive, the customer will be subject to\nMandatory Hourly Pricing and have two supply options, ESS or Hourly Pricing option, as described below."},{"page":239,"startToken":59466,"endToken":59883,"text":"PSC No: 120 - Electricity\nLeaf No. 217.1\nNew York State Electric & Gas Corporation\nRevision: 6\nInitial Effective Date: August 12, 2016\nSuperseding Revision: 5\nIssued in compliance with Order in Case 15-E-0283, dated June 15, 2016.\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (CONT'D.)\n4. Hourly Pricing – Mandatory and Voluntary (Cont'd.)\nDELIVERY CHARGES:\nThe delivery charges set forth in this Service Classification for standard service shall apply to a customer taking\nservice under Hourly Pricing. A customer that qualifies for the Economic Development Zone Incentive shall pay the\ndelivery charges set forth in the Special Provision (d)(3) Economic Development Zone Incentive. A customer that\nqualifies for the Industrial/High Load Factor Special Provision shall pay the delivery charges as set forth in the Special\nProvision (h).\nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS:\nCustomers served under this provision must select from the different electricity Supply Service Options offered by the\nCompany as described below. NYSEG shall offer a Retail Access rate choice and a Non-Retail Access rate choice.\nThe Retail Access choice (see 1 below) is the ESCO Supply Service (ESS). The Non-Retail Access choice (see 2\nbelow) is the NYSEG Hourly Day-Ahead Market Pricing Option (“Hourly Pricing”).\nNYSEG shall provide only delivery service for the Retail Access choice. Electricity supply is provided by an Energy\nServices Company (“ESCO”). Hourly Pricing customers are able to select ESCO commodity service at any time.\nNYSEG shall provide delivery service and commodity service for the Non-Retail Access choice.\nA customer who has not chosen an option, and for whom NYSEG has not received a retail access enrollment from an\nESCO, shall default to the NYSEG Hourly Day-Ahead Market Pricing Option.\n1. ESCO Supply Service (ESS)\nThis Retail Access choice includes fixed charges for NYSEG delivery service and a Transition Charge set forth on the\nTransition Charge Statement. Electricity supply is provided by an ESCO. Customers that elect ESS and receive a\nConsolidated Bill shall not be subject to the Bill Issuance Charge.\n2. NYSEG Hourly Day-Ahead Market Pricing Option (“Hourly Pricing”)\nThis Non-Retail Access choice includes fixed charges for NYSEG delivery service, a Transition Charge set forth on\nthe Transition Charge Statement, a Merchant Function Charge, and a commodity charge for electricity supply that\nfluctuates hourly with the market price of electricity including losses, unaccounted for energy, capacity, and capacity\nreserves, as further described herein. Electricity supply is provided by NYSEG."},{"page":240,"startToken":59883,"endToken":59972,"text":"PSC No: 120 - Electricity\nLeaf No. 218\nNew York State Electric & Gas Corporation\nRevision: 20\nInitial Effective Date: May 3, 2017\nSuperseding Revision: 19\nIssued in Compliance with Order in Case 15-E-0302, dated February 22, 2017 and 17-M-0106 dated April 20, 2017.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (CONT'D.)\n4. Hourly Pricing\nMandatory and Voluntary (Cont'd.)\nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS\n2. NYSEG Hourly Day-Ahead Market\nReserved for Future Use"},{"page":241,"startToken":59972,"endToken":60062,"text":"PSC No: 120 - Electricity\nLeaf No. 218.1\nNew York State Electric & Gas Corporation\nRevision: 5\nInitial Effective Date: April 1, 2017\nSuperseding Revision: 4\nIssued in Compliance with Order in Case 15-E-0302, dated February 22, 2017.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (CONT'D.)\n4. Hourly Pricing – Mandatory and Voluntary (Cont'd.)\nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (Cont’d.)\n2. NYSEG Hourly Day-Ahead Market Pricing Option (“Hourly Pricing”) (Cont’d.)\nReserved for Future Use"},{"page":242,"startToken":60062,"endToken":60353,"text":"PSC No: 120 - Electricity\nLeaf No. 219\nNew York State Electric and Gas Corporation\nRevision: 8\nInitial Effective Date: July 1, 2016\nSuperseding Revision: 6\nIssued in compliance with Order in Case 15-E-0283, dated June 15, 2016\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (CONT'D.)\n4. Hourly Pricing – Mandatory and Voluntary (Cont'd.)\nMETERING AND COMMUNICATION REQUIREMENTS:\n1. Customer Responsibilities:\nAll customers subject to this special provision are required to have interval metering and remote meter reading\ncapability. Such customers shall be responsible for the following:\na.\nthe costs of providing remote meter reading capability through dedicated telecommunications to and\nfrom the meter; and\nb.\nthe dedicated telecommunications shall be approved by the Company, and\nc.\nall costs associated with the installation, operation and maintenance of the telecommunications\nequipment, including but not limited to, all telecommunications service bills. If the Company is unable\nto read the meter through a customer provided connection, and the Company has determined that the\nproblem is not caused by the Company's equipment, the customer shall be responsible for resolution of\nthe problem. The customer shall also be responsible for reimbursement of the Company expenses\nincurred for visits to the meter location to ascertain the cause of the problem, including reimbursing the\nCompany for any expenses the Company incurs, such as, but not limited to, the cost to provide a\nmanual meter read.\n2.\nCompany Responsibilities:\na. Equipment shall be replaced at the Company’s discretion and shall be based upon available resources\nand Company Schedule.\nb. In the absence of equipment failure, if the customer requests replacement of working equipment, it shall\nbe scheduled by order of request and availability."},{"page":243,"startToken":60353,"endToken":60538,"text":"PSC No: 120 - Electricity\nLeaf No. 220\nNew York State Electric & Gas Corporation\nRevision: 10\nInitial Effective Date: November 1, 2023\nSuperseding Revision: 8\nIssued in compliance with Order in Case No. 22-E-0317, dated October 12, 2023.\nISSUED BY: Jeremy Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nMERCHANT FUNCTION CHARGE:\nThe Merchant Function Charge reflects the administrative costs of obtaining electricity supply.\nCustomers whose\nelectricity is supplied by an ESCO are not charged for this service.\nMINIMUM CHARGE:\nThe minimum charge for service under this Service Classification is the monthly Customer Charge as listed above plus the\nBill Issuance Charge, if applicable, or unless otherwise stated in the applicable special provisions.\nThe minimum charge for customers who choose to take all or part of their back-up or maintenance service under this service\nclassification rather than under Special Provision (d) of NYSEG's Service Classification No. 11 is described in the\n\"DETERMINATION OF DEMAND\" section.\n:\nA customer taking service under this Service Classification shall be subject to a RDM adjustment (as explained in this\nSchedule, General Information Section 7). See RDM Statement."},{"page":244,"startToken":60538,"endToken":60987,"text":"PSC No: 120 - Electricity\nLeaf No. 221\nNew York State Electric & Gas Corporation\nRevision: 34\nInitial Effective Date: January 1, 2025\nSuperseding Revision: 33\nIssued in compliance with Orders in Case No. 24-E-0493, dated December 19, 2024.\nISSUED BY: Jeremy Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSURCHARGE TO COLLECT SYSTEM BENEFITS CHARGE (\"SBC\"):\nA surcharge shall be added to each customer bill for service under this Service Classification to collect the System\nBenefits Charge (as explained in this Schedule, General Information Rule 4). See SBC Statement. kWh supplied\nby NYPA are exempt from the System Benefits Charge.\nThe RAM shall be applied per kW to all kW delivered under this Service Classification (as explained in this\nschedule, General Information Rule 38). See RAM Statement.\nEARNINGS ADJUSTMENT MECHANISM ( EAM ):\nThe EAM shall be applied per kW delivered under this Service Classification, (as explained in this Schedule\nGeneral Information Rule 46). The rate shall be set forth on the EAM Statement.\nNON-WIRES ALTERNATIVE ( NWA ) SURCHARGE:\nThe NWA Surcharge shall be applied per kW delivered under this Service Classification, (as explained in this\nSchedule General Information Rule 47). The rate shall be set forth on the NWA Statement.\n-\nThe EV Surcharge shall be applied per kW delivered under this Service Classification, (as explained in this\nSchedule General Information Rule 49). The rate shall be set forth on the EVMR Statement.\nRECOVERY CHARGE\nThe Recovery Charge shall be applied per kW delivered under this Service Classification, (as explained in this\nSchedule General Information Rule 57). The rate shall be set forth on the Recovery Charge Statement.\nMETER OWNED BY CUSTOMER, INSTALLED AND MAINTAINED BY THE COMPANY:\nCustomers electing to own their meters, as described in Section 3.A.II of P.S.C. No. 119\nElectricity, shall\nreceive a Meter Ownership Credit.\nINCREASES IN RATES AND CHARGES:\nThe rates and charges under this Service Classification, including the minimum charge, shall be increased by a\nsurcharge pursuant to Rule 6 of P.S.C. No. 120 to reflect the tax rates applicable within the municipality where the\ncustomer takes service.\nDETERMINATION OF DEMAND:\nThe Determination of Demand shall be derived from the on-peak hours only. The metered demand shall be the\nhighest average kW used in a 15-minute interval during the month.\n(For customers whose meters are read bi-monthly, the billing demand shall be 95% of the metered demand.)\nFor subtransmission and transmission customers also served by the Company under Special Provision F of\nService Classification No. 10, the measured demand of the output provided by the customer's generating facility\nshall be added to the measured demand as determined by the Company's meter for service under this\nClassification."},{"page":245,"startToken":60987,"endToken":61610,"text":"PSC No: 120 - Electricity\nLeaf No. 222\nNew York State Electric and Gas Corporation\nRevision: 5\nInitial Effective Date: July 1, 2014\nSuperseding Revision: 4\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nDETERMINATION OF DEMAND: (Cont’d.)\nCustomers who choose to take all or part of their back-up or maintenance service under this service classification rather than\nunder Special Provision (d) of the Company’s Service Classification No. 11 will pay a minimum demand charge as described\nin the Company’s Service Classification No. 11. Customers will pay a minimum demand charge related to generation,\nancillary, and transmission costs. The minimum demand charge is based on a rate per kW of the contract demand and is\naccumulated over a 12-month period.\nThe accumulated contract demand charge component will be compared to the\naccumulated demand charge in this service classification. If the contract demand charge is greater than the demand charge in\nthis service classification, then the customer will only pay the contract demand charge in that month. If it is less than the\ndemand charge in this service classification, then the customer will pay that difference in that month.\nDETERMINATION OF REACTIVE\nKILOVOLT-AMPERE HOURS:\nWhenever the customer's metered demand is 200 KW or more for two consecutive billing periods, the reactive kilovolt-\nampere hours shall thereafter be metered. The billing reactive kilovolt-ampere hours shall be the reactive kilovolt-\nampere hours in excess of one-third of the metered kilowatt hours.\nEffective 05/01/2010:\nWhenever the customer’s metered demand is 200 kW or more for two billing periods in any two of the previous 12\nmonths, the reactive kilovolt-ampere hours shall thereafter be metered. The billing reactive kilovolt-ampere hours\nwill be the reactive kilovolt-ampere hours in excess of one-fourth of the metered kilowatt-hours.\nTERMS OF PAYMENT:\nAll bills are rendered at the above \"unit prices\" and that amount is due on bills paid on or before the past due date\nindicated on the bill. A late payment charge at the rate of one and one-half percent (1 1/2%) per month will be billed\non all amounts not paid by that date. (Further details in Section 4 of P.S.C. No. 119 - Electricity or superseding issues\nthereof.)\nTERM:\nOne year and thereafter until terminated by 30 days' notice. However, the Company may, with the permission of the\nPublic Service Commission, require the customer to agree to take service at rates from time to time effective for a\nlonger term dependent upon the amount of investment required or other unusual conditions incident to the service.\nTime-of-use metering and billing will continue even if the customer's demands should remain below 500 KW and as set\nforth in Special Provision (e) herein.\nVOLTAGE OPTION:\nCustomers taking service at other than the stated Secondary Voltages shall furnish and maintain the necessary\ntransformer substation.\nAt the discretion of the Company, metering for Transmission Service may be on the secondary side of the customer's\ntransformers and calculated transformer losses will be added to measured demand and energy prior to billing. When\nmetering is on the secondary side of the customer's transformers, no load transformer losses will be based on\nmanufacturer's published data for customer's transformers, or equivalent, assuming 730 hours per month. Load losses\nbased on manufacturer's published data for customer's transformer, or equivalent, will be determined by multiplying\nmetered demand and metered energy, respectively, by individually calculated factors developed in accordance with\ngenerally accepted engineering principles assuming 730 hours per month and taking cognizance of full load capacity of\nthe customer's transformer, the customer's average peak load and the load factor and average power factor of the load.\nSuch factors will be reviewed annually or as load changes require."},{"page":246,"startToken":61610,"endToken":61711,"text":"PSC No: 120 - Electricity\nLeaf No. 223\nNew York State Electric and Gas Corporation\nRevision: 2\nInitial Effective Date: May 1, 2017\nSuperseding Revision: 1\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS:\n(a)\nBudget Billing:\nCustomers may, by signing an application, be billed monthly in accordance with the plan set forth in\nSection 4-P of P.S.C. No. 119 - Electricity or superseding issues thereof.\n(b)\nSubmetering:\nSubmetering may be available according to certain conditions as explained in the General Information\nleaves of this Schedule, Section 2, Submetering."},{"page":247,"startToken":61711,"endToken":61762,"text":"PSC No: 120 - Electricity\nLeaf No. 224\nNew York State Electric and Gas Corporation\nRevision: 5\nInitial Effective Date: November 1, 2021\nSuperseding Revision: 4\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd)\n(c) Reserved for Future Use"},{"page":248,"startToken":61762,"endToken":61825,"text":"PSC No: 120 - Electricity\nLeaf No. 225\nNew York State Electric and Gas Corporation\nRevision: 2\nInitial Effective Date: July 1, 2016\nSuperseding Revision: 0\nIssued in compliance with Order in Case 15-E-0283, dated June 15, 2016\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd)\nReserved for Future Use"},{"page":249,"startToken":61825,"endToken":61890,"text":"PSC No: 120 - Electricity\nLeaf No. 226\nNew York State Electric & Gas Corporation\nRevision: 12\nInitial Effective Date: March 20, 2021\nSuperseding Revision: 11\nIssued in compliance with Order in Case 19-E-0378, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd)\n(d) Economic Incentives:\n(1)\nReserved for Future Use"},{"page":250,"startToken":61890,"endToken":61967,"text":"PSC No: 120 - Electricity\nLeaf No. 227\nNew York State Electric & Gas Corporation\nRevision: 10\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 9\nIssued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd)\n(d)\nEconomic Incentives: (Cont'd)\n(1)\nReserved for Future Use\n(2)\nReserved for Future Use\n(3)\nReserved for Future Use"},{"page":251,"startToken":61967,"endToken":62034,"text":"PSC No: 120 - Electricity\nLeaf No. 228\nNew York State Electric & Gas Corporation\nRevision: 27\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 25\nIssued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd)\n(d) Economic Incentives: (Cont'd)\n(3) Reserved for Future Use"},{"page":252,"startToken":62034,"endToken":62101,"text":"PSC No: 120 - Electricity\nLeaf No. 229\nNew York State Electric & Gas Corporation\nRevision: 24\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 22\nIssued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd)\n(d) Economic Incentives: (Cont'd)\n(3)\nReserved for Future Use"},{"page":253,"startToken":62101,"endToken":62167,"text":"PSC No: 120 - Electricity\nLeaf No. 230\nNew York State Electric & Gas Corporation\nRevision: 27\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 25\nIssued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd)\n(d) Economic Incentives: (Cont'd)\nReserved for Future Use"},{"page":254,"startToken":62167,"endToken":62229,"text":"PSC No: 120 - Electricity\nLeaf No. 231\nNew York State Electric & Gas Corporation\nRevision: 21\nInitial Effective Date: July 1, 2016\nSuperseding Revision: 19\nIssued in compliance with Order in Case 15-E-0283, dated June 15, 2016\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd)\nReserved for Future Use"},{"page":255,"startToken":62229,"endToken":62302,"text":"PSC No: 120 - Electricity\nLeaf No. 232\nNew York State Electric & Gas Corporation\nRevision: 8\nInitial Effective Date: January 1, 2010\nSuperseding Revision: 7\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd)\n(d) Economic Incentives: (Cont'd)\n(3)\nEconomic Development Zone Incentive: (Cont'd)\nReserved for Future Use\nIssued in compliance with order in Case No. 09-E-0227 dated 09/28/09."},{"page":256,"startToken":62302,"endToken":62375,"text":"PSC No: 120 - Electricity\nLeaf No. 233\nNew York State Electric & Gas Corporation\nRevision: 9\nInitial Effective Date: January 1, 2010\nSuperseding Revision: 8\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd)\n(d) Economic Incentives: (Cont'd)\n(3)\nEconomic Development Zone Incentive: (Cont'd)\nReserved for Future Use\nIssued in compliance with order in Case No. 09-E-0227 dated 09/28/09."},{"page":257,"startToken":62375,"endToken":62443,"text":"PSC No: 120 - Electricity\nLeaf No. 234\nNew York State Electric and Gas Corporation\nRevision: 5\nInitial Effective Date: July 1, 2016\nSuperseding Revision: 3\nIssued in compliance with Order in Case 15-E-0283, dated June 15, 2016\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd)\n(d)\nEconomic Incentives: (Cont’d)\n(4)\nReserved for Future Use"},{"page":258,"startToken":62443,"endToken":62511,"text":"PSC No: 120 - Electricity\nLeaf No. 235\nNew York State Electric and Gas Corporation\nRevision: 2\nInitial Effective Date: July 1, 2016\nSuperseding Revision: 0\nIssued in compliance with Order in Case 15-E-0283, dated June 15, 2016\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd)\n(d) Economic Incentives: (Cont’d)\n(4) Reserved for Future Use"},{"page":259,"startToken":62511,"endToken":62567,"text":"PSC No: 120 - Electricity\nLeaf No. 236\nNew York State Electric & Gas Corporation\nRevision: 10\nInitial Effective Date: May 1, 2017\nSuperseding Revision: 9\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd.)\n(d)\n(4) Reserved for Future Use\n(5) Reserved for Future Use"},{"page":260,"startToken":62567,"endToken":62703,"text":"PSC No: 120 - Electricity\nLeaf No. 237\nNew York State Electric & Gas Corporation\nRevision: 7\nInitial Effective Date: November 1, 2011\nSuperseding Revision: 6\nIssued in compliance with order in Case 11-E-0176 dated September 19, 2011.\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd.)\n(d) (6)\nRecharge New York (“RNY”) Power Program\nCustomers who qualify for the Recharge NY Power Program pursuant to Section 11 of the General Information\nSection of this Schedule, will have such power billed in accordance with the provision therein. The customer's\npower requirements in excess of the RNY Power allocation will be billed in accordance with the ESCO Supply\nService rate or the NYSEG Supply Service rate of this Service Classification applicable to the customer's voltage\nlevel."},{"page":261,"startToken":62703,"endToken":62771,"text":"PSC No: 120 - Electricity\nLeaf No. 238\nNew York State Electric and Gas Corporation\nRevision: 5\nInitial Effective Date: July 1, 2016\nSuperseding Revision: 3\nIssued in compliance with Order in Case 15-E-0283, dated June 15, 2016\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd.)\n(d) Economic Incentives: (Cont’d)\n(7) Reserved for Future Use"},{"page":262,"startToken":62771,"endToken":62839,"text":"PSC No: 120 - Electricity\nLeaf No. 239\nNew York State Electric and Gas Corporation\nRevision: 2\nInitial Effective Date: July 1, 2016\nSuperseding Revision: 0\nIssued in compliance with Order in Case 15-E-0283, dated June 15, 2016\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd.)\n(d) Economic Incentives: (Cont’d)\n(7)\nReserved for Future Use"},{"page":263,"startToken":62839,"endToken":62907,"text":"PSC No: 120 - Electricity\nLeaf No. 240\nNew York State Electric and Gas Corporation\nRevision: 2\nInitial Effective Date: July 1, 2016\nSuperseding Revision: 0\nIssued in compliance with Order in Case 15-E-0283, dated June 15, 2016\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd.)\n(d) Economic Incentives: (Cont’d)\n(7)\nReserved for Future Use"},{"page":264,"startToken":62907,"endToken":63064,"text":"PSC No: 120 - Electricity\nLeaf No. 241\nNew York State Electric and Gas Corporation\nRevision: 2\nInitial Effective Date: July 1, 2016\nSuperseding Revision: 0\nIssued in compliance with Order in Case 15-E-0283, dated June 15, 2016\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd.)\n(d) Economic Incentives: (Cont’d)\n(7) Reserved for Future Use\n(8) Reserved for Future Use\n(9)\nHigh Load Factor Manufacturer Power (\"HLFM\")\nBefore service will commence under this Special Provision, the Company and NYPA must execute an\nagreement governing additional terms of HLFM service. During the Price Cap Period (March 3, 1998\nthrough March 2, 2003) customers who qualify for this special HLFM power provision, pursuant to Section\n18 of the General Information section of this Schedule, provided such load was not previously served by the\nCompany, will have such power billed in accordance with the following rate schedule:"},{"page":265,"startToken":63064,"endToken":63403,"text":"PSC No: 120 - Electricity\nLeaf No. 242\nNew York State Electric and Gas Corporation\nRevision: 3\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 2\nIssued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd.)\n(d) (9) High Load Factor Manufacturer Power (\"HLFM\") (Cont'd.)\nUnit\nRATE: (Per Month)\nPrice\nDelivery Charge - All kilowatts, per kW\n(applied to the customer's monthly NYPA\nBilling Demand, adjusted for losses)\nOn-Peak\nTransmission\nNYSEG's then applicable OATT service rate\n(subject to FERC review, acceptance or\napproval)\nAdditional Charge for service below 34.5 kV\nPrimary\n$ 3.81\nSecondary\n$ 4.32\nDemand Charge - All kilowatts, per kW\nNYSEG shall charge the customer for a NYPA\n(applied to the customer's monthly NYPA\nDemand Charge for HLFM service subject to\nBilling Demand, adjusted for losses)\nthe execution of an agreement with NYPA for\nHLFM service.\nEnergy Charge - per kWh\nNYSEG shall charge the customer a NYPA\n(applied to the customer's monthly NYPA\nEnergy Charge for HLFM service subject to\nBilling Energy, adjusted for losses)\nthe execution of an agreement with NYPA for\nHLFM service.\nReactive Charge: *\nReactive kilovolt-ampere hours,\n$0.00078\nper billing reactive kilovolt-ampere hours\nHLFM customers may obtain energy loss compensation service, Operating Reserve - Spinning Reserve Service, and\nOperating Reserve - Supplemental Reserve Service (collectively referred to as \"voluntary ancillary services\") from\nNYPA or another supplier other than NYSEG. If such HLFM customer chooses to obtain the voluntary ancillary\nservices from NYSEG, they shall be provided at the rates and charges included in the then effective OATT, or for\nloss compensation services at rates and terms mutually agreed upon by NYSEG and such customer.\nOther Billing Adjustments:\nIncrease in Rates applicable to Municipality where service is supplied shall be applied to the amounts billed.\nBilling:\nBilling provisions related to HLFM service shall be subject to the execution of an agreement by the Corporation\nwith NYPA related to the provision of HLFM service."},{"page":266,"startToken":63403,"endToken":63467,"text":"PSC No: 120 - Electricity\nLeaf No. 243\nNew York State Electric & Gas Corporation\nRevision: 19\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 17\nIssued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd.)\n(d) (10) Reserved for Future Use"},{"page":267,"startToken":63467,"endToken":63530,"text":"PSC No: 120 - Electricity\nLeaf No. 243.1\nNew York State Electric & Gas Corporation\nRevision: 6\nInitial Effective Date: July 1, 2016\nSuperseding Revision: 4\nIssued in compliance with Order in Case 15-E-0283, dated June 15, 2016\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd.)\nReserved for Future Use"},{"page":268,"startToken":63530,"endToken":63771,"text":"PSC No: 120 - Electricity\nLeaf No. 243.2\nNew York State Electric & Gas Corporation\nRevision: 16\nInitial Effective Date: November 1, 2023\nSuperseding Revision: 14\nIssued in compliance with Order in Case No. 22-E-0317, dated October 12, 2023.\nISSUED BY: Jeremy Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd.)\n(d) (11) Excelsior Jobs Program ( EJP )\nService taken under this Service Classification may be eligible for the rates and charges under the\nExcelsior Jobs Program. Any customer who meets the qualifications set forth under General Information\nRule 32 shall pay for service at the following rate:\nRATE: (per month)\nFor customers qualifying for the EJP, the Non-Bypassable Charge component of the Transition Charge\nand the Revenue Decoupling Mechanism (RDM) Adjustment does not apply to S.C. No. 7-1 Secondary,\nS.C. No. 7-2\nPrimary, S.C. No. 7-3\nSubtransmission and S.C. No. 7-4 - Transmission. All customers\nshall be required to pay Commodity, Capacity, Merchant Function, and Bill Issuance Charges, if\napplicable, in accordance with the standard NSS or ESS rates for this Service Classification. All\ncustomers are also required to pay the System Benefits Charges, and Reactive Charges in accordance\nwith the standard NSS or ESS rates for this Service Classification.\nIf it is determined that a bill calculated with the incentive exceeds a bill calculated under the otherwise\napplicable standard service classification rates, the customer shall pay the lower of the two bills."},{"page":269,"startToken":63771,"endToken":64042,"text":"PSC No: 120 - Electricity\nLeaf No. 243.3\nNew York State Electric & Gas Corporation\nRevision: 9\nInitial Effective Date: November 1, 2023\nSuperseding Revision: 7\nIssued in compliance with Order in Case No. 22-E-0317, dated October 12, 2023.\nISSUED BY: Jeremy Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd.)\n(d) (11) Excelsior Jobs Program (EJP)\nVOLTAGE SECONDARY\nS.C. 7-1 DISTRIBUTION\nEffective Date\nDelivery Charges\n11/01/2023\n05/01/2024\n05/01/2025\nCustomer Charge\n$271.00\n$325.00\n$375.00\nMake-Whole Customer Charge\n$12.42\n$12.42\n$12.42\nDemand Charge\n(All kW, per kW)\n$4.18\n$3.65\n$3.19\nReactive Charge\nReactive kilovolt-ampere hours, per billing\nreactive kilovolt-ampere hour\n$0.00078\n$0.00078\n$0.00078\nVOLTAGE PRIMARY\nS.C. 7-2 DISTRIBUTION\nEffective Date\nDelivery Charges\n11/01/2023\n05/01/2024\n05/01/2025\nCustomer Charge\n$947.00\n$1,125.00\n$1,350.00\nMake-Whole Customer Charge\n$41.17\n$41.17\n$41.17\nDemand Charge\n(All kW, per kW)\n$3.61\n$3.39\n$3.09\nReactive Charge\nReactive kilovolt-ampere hours, per billing\nreactive kilovolt-ampere hour\n$0.00078\n$0.00078\n$0.00078\nVOLTAGE PRIMARY\nS.C. 7-3 SUBTRANSMISSION\nEffective Date\nDelivery Charges\n11/01/2023\n05/01/2024\n05/01/2025\nCustomer Charge\n$1,974.00\n$2,425.00\n$3,000.00\nMake-Whole Customer Charge\n$88.22\n$88.22\n$88.22\nDemand Charge\n(All kW, per kW)\n$1.03\n$0.75\n$0.36\nReactive Charge\nReactive kilovolt-ampere hours, per billing\nreactive kilovolt-ampere hour\n$0.00078\n$0.00078\n$0.00078\nEffective May 1, 2026, the Make-\nshall not include the Make-Whole Rate."},{"page":270,"startToken":64042,"endToken":64328,"text":"PSC No: 120 - Electricity\nLeaf No. 243.4\nNew York State Electric & Gas Corporation\nRevision: 11\nInitial Effective Date: November 1, 2023\nSuperseding Revision: 10\nIssued in compliance with Order in Case No. 22-E-0317, dated October 12, 2023.\nISSUED BY: Jeremy Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd.)\n(d) (11)\nEffective May 1, 2026, the Make-Whole Rate shall expire and the Delivery Charge that appears on the\n-Whole Rate.\nEJP customers shall be offered two supply service options and charged in accordance with their choice:\n1.\nESCO Supply Service\n2.\nNYSEG Supply Service\n(e)\nBilling Duration:\nService Classification No. 2 customers who opt for service under Service Classification No. 7 for the first\ntime must remain on the Time-Of-Use rate for a period of not less than six months prior to becoming\neligible to return to Service Classification No. 2. If a customer returns to Service Classification No. 2, the\ncustomer must remain a Service Classification No. 2 customer for at least 18 months before again becoming\neligible for Service Classification No. 7. If the customer again opts for Service Classification No. 7, the\ncustomer must remain on Service Classification No. 7 in conformance with the TERM as set forth herein.\n(f)\nRESERVED FOR FUTURE USE\n(g)\nRESERVED FOR FUTURE USE\nVOLTAGE PRIMARY\nS.C. 7-4 TRANSMISSION\nEffective Date\nDelivery Charges\n11/01/2023\n05/01/2024\n05/01/2025\nCustomer Charge\n$3,950.00\n$4,800.00\n$5,900.00\nMake-Whole Customer Charge\n$168.58\n$168.58\n$168.58\nDemand Charge\n(All kW, per kW)\n$0.47\n$0.39\n$0.26\nReactive Charge\nReactive kilovolt-ampere hours, per billing\nreactive kilovolt-ampere hour\n$0.00078\n$0.00078\n$0.00078"},{"page":271,"startToken":64328,"endToken":64392,"text":"PSC No: 120 - Electricity\nLeaf No. 244\nNew York State Electric and Gas Corporation\nRevision: 3\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 2\nIssued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd.)\n(h)\nReserved for Future Use"},{"page":272,"startToken":64392,"endToken":64456,"text":"PSC No: 120 - Electricity\nLeaf No. 245\nNew York State Electric and Gas Corporation\nRevision: 2\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 0\nIssued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd.)\n(h)\nReserved for Future Use"},{"page":273,"startToken":64456,"endToken":64520,"text":"PSC No: 120 - Electricity\nLeaf No. 246\nNew York State Electric and Gas Corporation\nRevision: 2\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 0\nIssued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd.)\n(h)\nReserved for Future Use"},{"page":274,"startToken":64520,"endToken":64579,"text":"PSC No: 120 - Electricity\nLeaf No. 247\nNew York State Electric & Gas Corporation\nRevision: 20\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 18\nIssued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nReserved for Future Use"},{"page":275,"startToken":64579,"endToken":64638,"text":"PSC No: 120 - Electricity\nLeaf No. 248\nNew York State Electric & Gas Corporation\nRevision: 26\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 24\nIssued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nReserved for Future Use"},{"page":276,"startToken":64638,"endToken":64699,"text":"PSC No: 120 - Electricity\nLeaf No. 248.1\nNew York State Electric & Gas Corporation\nRevision: 3\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 2\nIssued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\n(h)\nReserved for Future Use"},{"page":277,"startToken":64699,"endToken":64758,"text":"PSC No: 120 - Electricity\nLeaf No. 249\nNew York State Electric & Gas Corporation\nRevision: 26\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 24\nIssued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nReserved for Future Use"},{"page":278,"startToken":64758,"endToken":64819,"text":"PSC No: 120 - Electricity\nLeaf No. 249.1\nNew York State Electric & Gas Corporation\nRevision: 3\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 2\nIssued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\n(h)\nReserved for Future Use"},{"page":279,"startToken":64819,"endToken":64878,"text":"PSC No: 120 - Electricity\nLeaf No. 250\nNew York State Electric & Gas Corporation\nRevision: 26\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 24\nIssued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nReserved for Future Use"},{"page":280,"startToken":64878,"endToken":64938,"text":"PSC No: 120 - Electricity\nLeaf No. 250.1\nNew York State Electric & Gas Corporation\nRevision: 3\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 2\nIssued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nReserved for Future Use"},{"page":281,"startToken":64938,"endToken":65021,"text":"PSC No: 120 - Electricity\nLeaf No. 251\nNew York State Electric & Gas Corporation\nRevision: 20\nInitial Effective Date: January 1, 2010\nSuperseding Revision: 19\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd.)\n(h)\nIndustrial/High Load Factor Rate Provision (Cont’d.):\n(4)\nRate for Industrial/High Load Factor Service: (Per Month) (Cont'd.)\nb. Reserved for Future Use\nIssued in compliance with order in Case No. 09-E-0227 dated 09/28/09."},{"page":282,"startToken":65021,"endToken":65082,"text":"PSC No: 120 - Electricity\nLeaf No. 251.1\nNew York State Electric & Gas Corporation\nRevision: 3\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 2\nIssued in compliance with Order in Case No. 19-E-0378, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\n(h)\nReserved for Future Use"},{"page":283,"startToken":65082,"endToken":65224,"text":"PSC No:  120 - Electricity \n \n \nLeaf No. 252 \nNew York State Electric & Gas Corporation \n \n \nRevision: 19  \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision: 17  \nIssued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York \n \nSERVICE CLASSIFICATION NO. 7 (Continued) \n \nSPECIAL PROVISIONS: (Cont'd) \n \n(h) \nReserved for Future Use \n \n(i) \nReserved for Future Use \n \n(j) \nOptional Election of Service Classification No. 11 Rates: \n \n \n  \nA demand-metered customer that does not have On-Site Generating facilities (“OSG”) may opt to select the \napplicable rates under Service Classification No. 11 and be billed under such rates for a period of not less \nthan 12 months.  \n \nA customer that opts for these rates shall comply with the “Optional Election of Service Rate for Customers \nWithout On-site Generation” as described in Service Classification No. 11."},{"page":284,"startToken":65224,"endToken":65288,"text":"PSC No: 120 - Electricity\nLeaf No. 253\nNew York State Electric and Gas Corporation\nRevision: 4\nInitial Effective Date: January 1, 2008\nSuperseding Revision: 2\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd)\nReserved for Future Use\nIssued in compliance with order in Case No. 07-E-0479 dated 08/29/07."},{"page":285,"startToken":65288,"endToken":65352,"text":"PSC No: 120 - Electricity\nLeaf No. 254\nNew York State Electric and Gas Corporation\nRevision: 4\nInitial Effective Date: January 1, 2008\nSuperseding Revision: 2\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd)\nReserved for Future Use\nIssued in compliance with order in Case No. 07-E-0479 dated 08/29/07."},{"page":286,"startToken":65352,"endToken":65417,"text":"PSC No: 120 - Electricity\nLeaf No. 254.1\nNew York State Electric and Gas Corporation\nRevision: 2\nInitial Effective Date: January 1, 2008\nSuperseding Revision: 0\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd)\nReserved for Future Use\nIssued in compliance with order in Case No. 07-E-0479 dated 08/29/07."},{"page":287,"startToken":65417,"endToken":65482,"text":"PSC No: 120 - Electricity\nLeaf No. 254.2\nNew York State Electric and Gas Corporation\nRevision: 1\nInitial Effective Date: January 1, 2008\nSuperseding Revision: 0\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd)\nReserved for Future Use\nIssued in compliance with order in Case No. 07-E-0479 dated 08/29/07."},{"page":288,"startToken":65482,"endToken":65547,"text":"PSC No: 120 - Electricity\nLeaf No. 254.3\nNew York State Electric and Gas Corporation\nRevision: 2\nInitial Effective Date: January 1, 2008\nSuperseding Revision: 0\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd)\nReserved for Future Use\nIssued in compliance with order in Case No. 07-E-0479 dated 08/29/07."},{"page":289,"startToken":65547,"endToken":65612,"text":"PSC No: 120 - Electricity\nLeaf No. 254.4\nNew York State Electric and Gas Corporation\nRevision: 1\nInitial Effective Date: January 1, 2008\nSuperseding Revision: 0\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd)\nReserved for Future Use\nIssued in compliance with order in Case No. 07-E-0479 dated 08/29/07."},{"page":290,"startToken":65612,"endToken":66194,"text":"PSC No: 120 - Electricity\nLeaf No. 255\nNew York State Electric & Gas Corporation\nRevision: 6\nInitial Effective Date: November 1, 2023\nSuperseding Revision: 5\nIssued in compliance with Order in Case No. 22-E-0317, dated October 12, 2023.\nISSUED BY: Jeremy Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 7 (Continued)\nSPECIAL PROVISIONS: (Cont'd.)\n(k)\nC.A.$.H.BACK Special Provision:\nThe Company shall provide a voluntary program for load normally supplied and delivered by the Company, for\neligible customers to curtail load. The Company's program, entitled C.A.$.H.BACK, implements the NYISO's day-\nahead economic load-curtailment program. Under this program, a customer agrees to curtail load when their bid is\nsubmitted and accepted by the NYISO.\nCustomers who are qualified under C.A.$.H.BACK in Section 21 of the General Information section of this Schedule\nmay participate in the Company C.A.$.H.BACK Program as set forth therein.\n(l)\nFarm Waste Electric Generating System Option:\nThis option is for a customer qualifying for the Farm Waste Electric Generating System Option pursuant to General\nInformation Section 22 of this Schedule and taking service under S.C. No. 7. If electricity (kWh) supplied by the\ncustomer to the Company is not metered for the time-differentiated periods, an allocation to each TOU period shall be\ndone according to allocation factors as described herein.\n47% of the excess electricity (kWh) supplied by the\ncustomer shall be considered On-Peak. 53% of the excess electricity (kWh) shall be considered Off-Peak.\n(m)\nWind Electric Service Option:\nThis option is for a customer qualifying for the Wind Non-Residential Service Option pursuant to General\nInformation Section 22 of this Schedule and taking service under S.C. No. 7. If electricity (kWh) supplied by the\ncustomer to the Company is not metered for the time-differentiated periods, an allocation to each TOU period shall be\ndone according to allocation factors as described herein.\n47% of the excess electricity (kWh) supplied by the\ncustomer shall be considered On Peak. 53% of the excess electricity (kWh) shall be considered Off Peak.\n(n)\nSolar Non-Residential Electric Service Option:\nThis option is for a customer qualifying for the Solar Non-Residential Generating Service Option pursuant to General\nInformation Section 22 of this Schedule and taking service under S.C. No. 7. If electricity (kWh) supplied by the\ncustomer to the Company is not metered for the time-differentiated periods, an allocation to each TOU period shall be\ndone according to allocation factors as described herein.\n47% of the excess electricity (kWh) supplied by the\ncustomer shall be considered On Peak. 53% of the excess electricity (kWh) shall be considered Off Peak.\n(o)\nElectric Hybrid Generating System Option:\nThis option is for a customer qualifying for the Electric Hybrid Generating System Option pursuant to General\nInformation Section 22 of this Schedule and taking service under S.C. No. 7.\n(p)\nFuel Cell Electric Service Option:\nThis option is for a customer qualifying for the Fuel Cell Service Option pursuant to General Information Section 22\nof this Schedule and taking service under S.C. No. 7.\n(q)\nMicro-Hydroelectric Service Option:\nThis option is for a customer qualifying for the Micro-Hydroelectric Service Option pursuant to\nGeneral Information Section 22 of this Schedule and taking service under S.C. No. 7.\n(r)\nCommunity Distributed Generation Service Option:\nThis option is for a customer qualifying for the Community Distributed Generation Service Option pursuant to\nGeneral Information Section 37 of this Schedule and taking service under S.C. No. 7."},{"page":291,"startToken":66194,"endToken":66361,"text":"PSC No: 120 - Electricity\nLeaf No. 255.1\nNew York State Electric & Gas Corporation\nRevision: 1\nInitial Effective Date: October 17, 2025\nSuperseding Revision: 0\nIssued in compliance with Order in Case No. 22-E-0236, dated October 17, 2024.\nISSUED BY: Patricia Nilsen, Chief Executive Officer, Binghamton, New York\nSERVICE CLASSIFICATION NO.7 (Continued)\nSPECIAL PROVISIONS: (Cont'd)\n(s)\nand Serve New Governmental Entities\nParticipants in the NYPA Program shall be subject to the otherwise applicable standard service\nclassification rates, including the Transition Charge (Non-Bypassable Charge), Bill Issuance Charges, if\napplicable, in accordance with the standard ESS rates for this Service Classification. All customers are also\nrequired to pay the System Benefits Charges, and Rate Adjustment Mechanism in accordance with the\nstandard ESS rates for this Service Classification. NYPA Program to Serve Governmental Entities\n.\n(t)\nElectric Vehicle Phase-In Rate\nAn eligible customer may elect to participate in the Electric Vehicle Phase-In Rate pursuant to General\nInformation Section 31 of this Schedule subject to the provisions and eligibility requirements therein."},{"page":292,"startToken":66361,"endToken":66377,"text":"New York State Electric & Gas Corporation \nService Classification 11: Standby Service \nOtherwise Applicable Service Class 7"},{"page":293,"startToken":66377,"endToken":66843,"text":"PSC No: 120 - Electricity\nLeaf No. 282\nNew York State Electric & Gas Corporation\nRevision: 5\nInitial Effective Date: January 1, 2024\nSuperseding Revision: 4\nIssued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Binghamton, New York\nSTANDBY SERVICE RATE\nSERVICE CLASSIFICATION NO. 11\nAPPLICABLE TO USE OF SERVICE FOR:\n1.\nDelivery of standby service for any customer where all or a portion of a customer's electricity is supplied from\nOn-Site Generating facil\nand/or transmission system, regardless of voltage or functional classification). An OSG, whether owned by the\ncustomer or a third party, can produce electricity primari\ndelivery system for parallel operation, or operate under the control of a single pull, double-throw switch (or\nelectrical services that are not electrically isolated from the OSG. All separately metered electricity supply\nand/or delivery ser\nguardhouse or other facilities electrically isolated from the OSG) shall be provided under the Otherwise\n). This service classification shall apply to a customer that installs\nstand-alone storage, or storage paired with non-renewable OSG, with a maximum inverter capability greater\nthan 1 MW.\n2.\nBefore a customer is allowed to install and operate an OSG, the customer must submit design and operating\ninformation for the proposed OSG in accordance with the appropriate application and review process described\n-\n-\nA customer operating OSG with a total nameplate rating equal to, or expected to be equal to, 15% or less of its\nmaximum potential demand served by all sources, as that maximum potential demand is reasonably determined\nby the Company, shall take service under the OASC unless the customer opts to take service under this\nclassification. NYSEG may disqualify a customer from Standby Service if the Company can demonstrate that\nthe customer (a) has installed OSG with a total nameplate rating greater than 15% of its load, but (b) has not\noperated or is not operating that OSG in a materi\nA customer who declines service under this tariff is required to electrically isolate its facility from the\nshall not be required to maintain electric delivery service to that\nshall\nElectrically Isolated Loads:\nIf a customer elects to electrically isolate and serve its load with OSG without connection to the Company's system,\nthe isolated portion of that customer's load shall not be subject to standby service -- provided that the customer\nexecutes a letter agreement with the Company that provides for the following:\na) the Company shall be entitled to inspect the electrical configuration of the OSG facilities upon a\ncustomer's request for this exemption;\nb) if, at any time, the Company has a reasonable concern that the custo\nremained isolated from the Company's system, the Company is authorized to inspect the electrical\nconfiguration of such facilities, and the customer must cooperate with that inspection; and"},{"page":294,"startToken":66843,"endToken":67198,"text":"PSC No: 120 - Electricity\nLeaf No. 283\nNew York State Electric & Gas Corporation\nRevision: 6\nInitial Effective Date: January 1, 2024\nSuperseding Revision: 5\nIssued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023.\nISSUED BY: Jeremy Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\nc) if the Company discovers, through billing data and/or the inspection of the customer's OSG facilities,\nthat any of the electrically isolated OSG fac\nCompany will backbill the customer. A contract demand will be established by the Company and the\nby Customer section, with Late Payment Charges as applicable, set forth in the Terms of Payment section\nof this Service Classification.\nA facility shall\nthe Company could occur are separated and at least 100 feet from any other interconnected electrical service utilized\nby such customer, or (b) the isolated service is not within the same building or structure as any other interconnected\nelectrical service of the customer and not housed within a common enclosure with other interconnected breakers\nand/or fuses of the customer. At its discretion, the Company may consider a separation of less than 100 feet\n-specific\nconfiguration circumstances warranting such a determination.\nCompliance:\nA customer taking standby service shall comply with all federal, state and local laws, regulations, and\nrequirements, including the requirements listed below in the Interconnection Requirements\nparagraphs 1 through 8.\nSTANDBY SERVICE NOT APPLICABLE TO:\n1a. Net Metered Solar Generating System Option\nStandby service will not apply to a customer operating solar generating equipment and taking service under\nGeneral Information Rule 22\n1b. Farm Waste Electric Generating System Option\nStandby service will not apply to a customer taking service under the Farm Waste Electric Generating System\nOption, provided such customer meets criteria for service under General Information Rule 22 of this\nSchedule.\n1c. Net Metered Wind Generating System Option\nStandby service will not apply to a customer operating wind generating equipment and taking service under\nGeneral Information Rule 22.\n1d. Net Metered Hybrid Generating System Option\nStandby service will not apply to a customer operating hybrid generating equipment and taking service under\nGeneral Information Rule 22."},{"page":295,"startToken":67198,"endToken":67731,"text":"PSC No: 120 - Electricity\nLeaf No. 284\nNew York State Electric & Gas Corporation\nRevision: 10\nInitial Effective Date: July 1, 2023\nSuperseding Revision: 9\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\n2. Emergency Generators\nStandby service rates shall not apply to customers whose only generating units are emergency generators. For the\npurpose of this Service Classification, a generating unit must meet each of the following two criteria to be\nconsidered an emergency generator:\na) The emergency generator is used exclusively for purposes of supplying electrical power to the\nCustomer when electrical power is not available from the Company.\nb) No load is served by the emergency generator while electric service is available from the\nCompany to the premises, except for regularly scheduled tests when the generator is required to\noperate under load\nEmergency Demand Response Program.\nExcluding residential customers, the customer must submit a one-line diagram and specification sheet on the switch for\nthe OSG for the Company\nw and approval. In addition, the customer must enter into a letter agreement with the\nCompany stating that the emergency generator shall\nThe customer shall maintain an operating log for each emergency generator indicating the date, time, hours, and purpose\nof each operation of each such facility. This log shall be made available to the Company upon request. Failure to do so\nshall permit the Company to (a) bill the customer under this Service Classification for the amount of standby service\nwhich the Company can reasonably estimate was delivered to and/or available to the customer during times when the\nCompany did not charge the customer for such service due to this emergency generator exemption; and (b) establish a\ncontract demand for one year, and thereafter as applicable.\n3. New York Power Authority Allocations\nStandby service shall\niated with the delivery of electricity\n4. Stand-Alone Energy Storage Systems\nA customer with a stand-alone energy storage system enrolled with NYISO to charge for wholesale purposes will be\nbilled pursuant to the Wholesale Distribution Service ( WDS ), at such time that the WDS tariff becomes effective, and\nshall not be subject to Standby Service rates.\nOPTIONAL STANDBY SERVICE RATE IS APPLICABLE TO:\n1. Existing Customers\nAn Existing Customer is defined as a customer operating OSG (includ\nand wholesale generators) or who:\na) had commenced construction of an OSG facility;\nb) had been named by the New York State Energy Research and Development Authority (\"NYSERDA\") as an\nOSG project grant recipient as listed in the Commission Order Establishing Electric Standby Rates, issued and\neffective July 30, 2003, Attachment A, paragraph 4;\nc) had been named by NYSERDA as an OSG feasibility study grant recipient, as listed in the Commission Order\nEstablishing Electric Standby Rates, issued and effective July 30, 2003, Attachment A, paragraph 4;\nd) had received a binding, written financial commitment from a lending institution for the construction and\ninstallation of an OSG; or\ne) was being billed at standby rates as of January 31, 2003 as set forth in this Service Classification at Special\nProvision (d) below.\nTo remain qualified as an Existing Customer, the customer must commence operation of its OSG by May 31, 2021."},{"page":296,"startToken":67731,"endToken":68203,"text":"PSC No: 120 - Electricity\nLeaf No. 285\nNew York State Electric & Gas Corporation\nRevision: 8\nInitial Effective Date: June 1, 2023\nSuperseding Revision: 7\nIssued in compliance with Orders in Case No.19-E-0079, dated May 18, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\n2. A Designated Technology Customer is defined as:\na)\nA customer operating OSG that exclusively uses one or more of the following technologies and/or fuels for\nproducing electricity: : solar thermal; photovoltaics ( PV ); on land and offshore wind; hydroelectric;\ngeothermal electric; geothermal ground source heat; tidal energy; wave energy; ocean thermal; or\nb)\nnot exceed 15 MW of\ncapacity and is operational prior to May 31, 2021, and conforms with the following criteria:\ni.\nii. Annual overall efficiency should not be less than 60% based on the higher heating value (HHV) of the\nfuel input;\niii. The usable thermal energy compone\nusable annual energy output;\niv. The size limits shall be determined by aggregating the nameplate ratings of the generation units,\ninstalled at its location, excluding emergency generation units used only during a utility distribution\nsystem failure or in response to the NYISO Emergency Demand Response Program:\nv. An eligible CHP facility shall demonstrate to the utility that its generation installation meets an\nenvironmental standard of no more than 4.4 lbs./MWh of NOx emissions, based on its electrical and\nmechanical output or its rated capacity, or as updated by the Department of Environmental\nConservation (DEC);\nvi. Customers shall comply with the above criteria and;\n1.\nMonitor and record efficiency data, which shall include the annual quantity of fuel fired,\nthe annual quantity of generated electricity, and the annual quantity of the thermal heat\nrecovered in the heat recovery process.\n2.\nHave records available for utility inspection,\n3.\nRetain the records for a 3-year period.\n4.\nAn additional meter will be required for CHP generating facilities greater than 1 MW.\nThe customer shall be required to install, at their expense, revenue grade, interval meters\nto measure generation output and additional telemetry equipment capable of\ntransmitting operational information to the Company; or\nc)\nA customer operating electric energy storage with a maximum inverter capability of up to and including 1\nMW; or\nd)\nA customer operating fuel cell units which utilize biofuels or hydrogen, provided that the manufacture or\nproduction of such fuels does not include the combustion or electrolysis of fossil fuels, or the use of fossil\nfuels or non-renewable grid power in the conversion process.\ni. Biomass, Biogas and Fuel cells which utilize fossil fuel resources installed prior to June 1, 2023\nshall remain exempt in accordance with the customer s election. Biomass, Biogas and Fuel cells\nwhich utilize fossil fuel resources installed on or after June 1, 2023 are not eligible for the\nDesignated Technologies Exemption."},{"page":297,"startToken":68203,"endToken":68302,"text":"PSC No: 120 - Electricity\nLeaf No. 285.1\nNew York State Electric & Gas Corporation\nRevision: 0\nInitial Effective Date: January 19, 2024\nSuperseding Revision:\nIssued in Compliance with Order in Case No. 22-E-0236, dated November 20, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\n2. A Designated Technology Customer is defined as (Cont d):\ne)\nA customer operating electric energy storage in conjunction with electric vehicle charging station(s) with\ninverter capability greater than 1 MW and less than or equal to the sum of nameplate electric vehicle charging\ncapability."},{"page":298,"startToken":68302,"endToken":68490,"text":"PSC No: 120 - Electricity\nLeaf No. 286\nNew York State Electric & Gas Corporation\nRevision: 10\nInitial Effective Date: January 1, 2024\nSuperseding Revision: 9\nIssued in compliance with order in Case No. 15-E-0751, dated October 13, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\n3. Designated Technology Exemption of Standby Rates\na)\nCustomers whose facilities are placed in service after July 29, 2003, and meet the definitions of both Existing\nCustomers and Designated Technology Customers, shall be considered to be Designated Technology\nCustomers for purposes of this section.\nb) Designated Technology Customers whose facilities are placed in service after July 29, 2003, have the option\nto make a one-time election to be permanently exempt from standby service rates rather than electing full\nstandby service rates upon providing 30 days written notice before commencing operation of the OSG\nfacility.\nc)\nExisting OSG projects that upgrade by installing designated technology components, or hybrid projects\ncomprised in part of designated technology components, are eligible for the designated technology\nexemption only for the upgraded components and only if those components are separately metered."},{"page":299,"startToken":68490,"endToken":68629,"text":"PSC No: 120 - Electricity\nLeaf No. 286.1\nNew York State Electric & Gas Corporation\nRevision: 4\nInitial Effective Date: July 1, 2019\nSuperseding Revision: 3\nIssued in compliance with Order in Case 15-E-0751, dated May 16, 2019.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\nCHARACTER OF SERVICE\nContinuous - Alternating Current, 60 cycle; Secondary Service at 120, 120/208, 120/240, 208, 240, 240/416,\n277/480, or 480 Volts; or Primary (Distribution) Service at 2,400, 4,160, 4,800, 7,200, 8,320, 12,000, 12,470,\n13,200, or 34,500 (Regulated) Volts; or Subtransmission Service at 34,500 or 46,000 (Both Non-Regulated) Volts;\nor Transmission Service at 115,000 Volts and above (Non-Regulated). Single or Three Phase. (Characteristics\ndepend upon available circuits and equipment.)"},{"page":300,"startToken":68629,"endToken":68916,"text":"PSC No:  120 - Electricity \n \n \nLeaf No. 287 \nNew York State Electric & Gas Corporation \n \n \nRevision:  34 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision: 32 \nIssued in compliance with Order in Case No 25-E-0375, dated May 14, 2026. \nIssued by:  Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York \n \n \nSERVICE CLASSIFICATION NO. 11 (Continued) \n \nRATES (Per Month) \n \nAn existing customer that taking service pursuant to this Service Classification as of January 1, 2024, shall be \nphased-in to the Redesigned Rates over a five-year period as described below for each year. \n \nA customer may make a one-time election to take service at the Redesigned Rates in lieu of the phase-in.  Such \nelection shall be provided by the customer to the Company in writing.  Once a customer has elected to take service \nat the Redesigned Rates, the customer may not return to the phase-in. \n \nAn existing customer that elects the phase-in shall be billed on the percentage basis shown below using the Prior \nRates and the Redesigned Rates for each year:  \n \n \nPrior Rates \nRedesigned Rates \nYear 1 \n83.3% \n16.7% \nYear 2 \n66.6% \n33.4% \nYear 3 \n49.9% \n50.1% \nYear 4 \n33.2% \n66.8% \nYear 5 \n16.5% \n83.5% \n \nAt the conclusion of Year 5, a customer shall be subject to the Redesigned Rates. \n \nDelivery Charges: There are up to four rate components of the delivery rate portion of this Standby Service:  \nCustomer Charge, Contract Demand Charge, As-Used Demand Charge, and Reactive Charge, as applicable.  \n \n \nTransition Charge:  The customer’s Otherwise Applicable Service Classification (“OASC”) shall determine \nthe applicable charge.  The charge shall apply to all kWh, per kWh.   \n \n \nBill Issuance Charge (per bill):  \n \n$0.89, as described in General Information Section 16.J"},{"page":301,"startToken":68916,"endToken":68979,"text":"PSC No:  120 - Electricity \n \n \nLeaf No. 287.0 \nNew York State Electric & Gas Corporation \n \n \nRevision:  2 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  0 \nIssued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. \nIssued by:  Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York \n \n \nSERVICE CLASSIFICATION NO. 11 (Continued) \n \nRATES (Per Month) (Cont’d) \n \nReserved for Future Use"},{"page":302,"startToken":68979,"endToken":69149,"text":"PSC No:  120 - Electricity \n \n \nLeaf No. 287.1 \nNew York State Electric & Gas Corporation \n \n \nRevision:  19 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  17  \nIssued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York \n \n \nSERVICE CLASSIFICATION NO. 11 (Continued) \nRATES (Per Month) (Cont’d.) \n \n1. Customer Charge \n \n \nPer customer, per month. \n \n \nCustomer's OASC: \n \nCustomer Charge \nEffective 6/01/2026: \n \nPrior Rates \n \n \nRedesigned Rates: \nSC No. 1 \n$19.00 \n$19.00 \nSC No. 8 \n$19.00 \n$19.00 \nSC No. 12 \n$19.00 \n$19.00 \nSC No. 2 \n$49.00 \n$49.00 \nSC No. 3 - Primary \n$185.00 \n$185.00 \nSC No. 3 - Subtransmission \n$450.00 \n$450.00 \nSC No. 6  \n$22.00 \n$22.00 \nSC No. 7-1 \n$375.00 \n$375.00 \nSC No. 7-2 \n$1,350.00 \n$1,350.00 \nSC No. 7-3 \n$3,000.00 \n$3,000.00 \nSC No. 7-4 \n$5,900.00 \n$5,900.00 \nSC No. 9 \n$22.00 \n$22.00"},{"page":303,"startToken":69149,"endToken":69343,"text":"PSC No:  120 - Electricity \n \n \nLeaf No. 287.1.0 \nNew York State Electric & Gas Corporation \n \n \nRevision:  3 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  1  \nIssued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. \n \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York \n \n \nSERVICE CLASSIFICATION NO. 11 (Continued) \n \n \nRATES (Per Month) (Cont’d.) \n \n \n2. Contract Demand Charge: The Contract Demand Charge is determined by multiplying the Customer’s \nContract Demand times the Contract Demand rate.  \n \n \n \n \n \n \n \n \n \n \n * Prior Rates are per Customer, per Meter \n \n \n \n \n \n \n \nEffective 6/1/2026: \nPrior Rates \n \nRedesigned Rates: \nCustomer's OASC: \nper kW of Contract \nDemand \nper kW of Contract \nDemand \nSC No. 1*  \n $30.76 \n$7.40 \nSC No. 8* \n $48.54 \n$7.40 \nSC No. 12* \n $141.45 \n$7.40 \nSC No. 2 \n $7.68 \n$5.13 \nSC No. 3 - Primary \n $7.75 \n$9.24 \nSC No. 3 - Subtransmission \n $2.45 \n$1.28 \nSC No. 6* \n $26.24 \n$14.34 \nSC No. 7-1 \n $6.16 \n$1.49 \nSC No. 7-2 \n $6.46 \n$5.02 \nSC No. 7-3 \n $1.56 \n$0.00 \nSC No. 7-4 \n $0.24 \n$0.08 \nSC No. 9* \n $44.72 \n$14.34"},{"page":304,"startToken":69343,"endToken":69408,"text":"PSC No:  120 - Electricity \n \n \nLeaf No. 287.1.0.1 \nNew York State Electric & Gas Corporation \n \n \nRevision:  2 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision: 0    \nIssued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York \n \nSERVICE CLASSIFICATION NO. 11 (Continued) \n \nRATES (Per Month) (Cont’d.) \n \n \nReserved for Future Use"},{"page":305,"startToken":69408,"endToken":69472,"text":"PSC No:  120 - Electricity \n \n \nLeaf No. 287.1.1 \nNew York State Electric & Gas Corporation \n \n \nRevision:  2 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  0  \nIssued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. \n \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York \n \n \nSERVICE CLASSIFICATION NO. 11 (Continued) \n \n \nRATES (Per Month) (Cont’d.) \n \n \nReserved for Future Use"},{"page":306,"startToken":69472,"endToken":69683,"text":"PSC No:  120 - Electricity \n \n \nLeaf No. 287.2 \nNew York State Electric & Gas Corporation \n \n \nRevision: 11 \nInitial Effective Date:  June 1, 2026 \n \nSuperseding Revision: 9 \nIssued in Compliance with Order in Case No. 25-E-0375, dated May 14, 2026. \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York \n \nSERVICE CLASSIFICATION NO. 11 (Continued) \n \nRATES (Per Month) (Cont’d.) \n \n \n \n3. As-Used Demand Charge: Daily As-Used Demand Charge, per kW of daily metered demand, during On-Peak \nand Super-Peak hours, as applicable. \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n* All kWh, per kWh for Prior Rates \nEffective: June 1, 2026 \nPrior Rates \nRedesigned \nRates  \nRedesigned \nRates \nCustomer's OASC: \n \nOn-Peak \nSuper-Peak \nSC No. 1* \n$0.04655 \n $0.10478 \n $0.20957 \nSC No. 8* \n$0.03332 \n $0.10478 \n $0.20957 \nSC No. 12* \n$0.02763 \n $0.10478 \n $0.20957 \nSC No. 2 \n$0.37356 \n $0.31697 \n $0.63393 \nSC No. 3 - Primary \n$0.41176 \n $0.19838 \n $0.39677 \nSC No. 3 - Subtransmission \n$0.27158 \n $0.20352 \n $0.40704 \nSC No. 6* \n$0.05640 \n $0.13133 \n $0.26265 \nSC No. 7-1 \n$0.33627 \n $0.35962 \n $0.71925 \nSC No. 7-2 \n$0.31011 \n $0.21056 \n $0.42113 \nSC No. 7-3 \n$0.11472 \n $0.10733 \n $0.21466 \nSC No. 7-4 \n$0.10475 \n $0.06030 \n $0.12060 \nSC No. 9* \n$0.03554 \n $0.13133 \n $0.26265"},{"page":307,"startToken":69683,"endToken":69742,"text":"PSC No:  120 - Electricity \n \n \nLeaf No. 287.3 \nNew York State Electric & Gas Corporation \n \n \nRevision: 2 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision: 0 \nIssued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 11 (Continued) \n \n \n \n \n \nReserved for Future Use"},{"page":308,"startToken":69742,"endToken":69801,"text":"PSC No:  120 - Electricity \n \n \nLeaf No. 287.4 \nNew York State Electric & Gas Corporation \n \n \nRevision: 2 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision: 0 \nIssued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York \n \nSERVICE CLASSIFICATION NO. 11 (Continued) \n \n \n \n \n \nReserved for Future Use"},{"page":309,"startToken":69801,"endToken":69925,"text":"PSC No:  120 - Electricity \n \n \nLeaf No. 288 \nNew York State Electric & Gas Corporation \n \n \nRevision:  34 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  32 \nIssued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 11 (Continued) \n \nRATES (Per Month) (Cont’d.) \n \n4. Reactive Charge \n \nEffective: 06/01/2026 \nCustomer's OASC: \nReactive Charge \nReactive kilovolt-ampere hours, per \nbilling reactive kilovolt-ampere hour \nSC No. 2 \n$0.00078 \nSC No. 3 - Primary \n$0.00078 \nSC No. 3 - Subtransmission \n$0.00078 \nSC No. 7-1 \n$0.00078 \nSC No. 7-2 \n$0.00078 \nSC No. 7-3 \n$0.00078 \nSC No. 7-4 \n$0.00078 \n \n \nNon-Bypassable Charge (“NBC”): \nAll kWh, per kWh \n \n \nSee TCS Statement"},{"page":310,"startToken":69925,"endToken":69982,"text":"PSC No: 120 - Electricity\nLeaf No. 288.1\nNew York State Electric & Gas Corporation\nRevision: 25\nInitial Effective Date: January 1, 2024\nSuperseding Revision: 24\nIssued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023.\nISSUED BY: Jeremy Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\nReserved for Future Use"},{"page":311,"startToken":69982,"endToken":70039,"text":"PSC No: 120 - Electricity\nLeaf No. 288.2\nNew York State Electric & Gas Corporation\nRevision: 18\nInitial Effective Date: January 1, 2024\nSuperseding Revision: 17\nIssued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023.\nIssued by: Jeremy Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\nReserved for Future Use"},{"page":312,"startToken":70039,"endToken":70096,"text":"PSC No: 120 - Electricity\nLeaf No. 288.3\nNew York State Electric & Gas Corporation\nRevision: 7\nInitial Effective Date: January 1, 2024\nSuperseding Revision:\n6\nIssued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023.\nIssued by: Jeremy Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\nReserved for Future Use"},{"page":313,"startToken":70096,"endToken":70588,"text":"PSC No: 120 - Electricity\nLeaf No. 289\nNew York State Electric & Gas Corporation\nRevision: 51\nInitial Effective Date: March 1, 2024\nSuperseding Revision: 50\nIssued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\nBilling of Reactive Kilovolt Hours:\nUnless it is determined by the Company that system operations require that the customer take reactive power from the\nCompany's system, all metered reactive energy used by the customer shall be billed at the rate specified above. This includes\nreactive power used during normal operation of the customer's OSG or Wholesale Generator as well as that used when the\nCompany provides standby service.\nRate Periods:\nPrior Rates\nExisting Customers that were taking service as of October 13, 2023:\nFor a customer whose OASC is S.C. Nos. 2, 3, or 7, On-Peak hours are defined for kW, kWh, and Daily As-Used Demand as\nthe hours between 7:00 a.m. and 10:00 p.m. (Local Time), Monday through Friday with the exception of the following\nholidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day. Those\nhours not designated as On-Peak are defined as Off-Peak. Other rate periods are as defin\nASC, i.e., S.C.\nNos. 8, 9 or 12.\nRedesigned Rates\nOn-Peak hours are defined for kW and kWh as the hours between 7:00 a.m. and 10:00 p.m., Monday through Friday.\nAll remaining hours are defined\n-\nFor As-Used Demand:\nSummer Super-Peak hours\nFrom 2:00 pm until 6:00 pm\non Non-Holiday Weekdays\nSummer months are June, July, August, and\nSeptember\nWinter Super-Peak hours\nFrom 5:00 pm until 9:00 pm\non Non-Holiday Weekdays\nWinter months are December, January, and\nFebruary\nSummer On-Peak hours\nFrom 7:00 am until 2:00 pm\nand\nFrom 6:00 pm until11:00 pm\non Non-Holiday Weekdays\nWinter On-Peak hours\nFrom 7:00 am until 5:00 pm\nand\nFrom 9:00 pm until 11:00 pm\non Non-Holiday Weekdays\nShoulder On-Peak hours\nFrom 7:00 am until 11:00 pm\non Non-Holiday Weekdays\nNon-Summer months are October, November,\nMarch, April, and May\nOff-Peak hours\nAll other hours including\nHolidays*\n* Holidays: New Year s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas\nDay\nSURCHARGE TO COLLECT SYSTEM BENEFITS CHARGE (\"SBC\"):\nA surcharge shall be added to each customer bill for service under this Service Classification to collect the System Benefits\nCharge (as explained in this Schedule, General Information Rule 4). See SBC Statement.\nA customer taking service under this Service Classification shall be subject to a Revenue Decoupling Mechanism adjustment\n(as explained in this Schedule, General Information Section 7). See RDM Statement.\nA customer billed at OASC as provided in this Service Classification shall be subject to a Revenue Decoupling Adjustment\n(as explained in this Schedule, General Information Rule\nOASC shall apply."},{"page":314,"startToken":70588,"endToken":70735,"text":"PSC No: 120 - Electricity\nLeaf No. 289.1\nNew York State Electric & Gas Corporation\nRevision: 4\nInitial Effective Date: January 1, 2025\nSuperseding Revision: 3\nIssued in compliance with Orders in Case No. 24-E-0493, dated December 19, 2024.\nISSUED BY: Jeremy Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\n-\nThe EV Surcharge shall be applied per kWh delivered under this Service Classification, (as explained in this\nSchedule General Information Rule 49). The rate shall be set forth on the EVMR Statement.\nRECOVERY CHARGE\nThe Recovery Charge shall be applied per On-Peak As-Used Demand under this Service Classification, (as\nexplained in this Schedule General Information Rule 57). The rate shall be set forth on the Recovery Charge\nStatement.\nTERMS OF PAYMENT:\nBills rendered under this Service Classification are payable on receipt. A late payment charge of 1½%) per month\nNo. 119\nElectricity, Section 4."},{"page":315,"startToken":70735,"endToken":71281,"text":"PSC No: 120 - Electricity\nLeaf No. 290\nNew York State Electric & Gas Corporation\nRevision: 2\nInitial Effective Date: July 1, 2019\nSuperseding Revision: 1\nIssued in compliance with Order in Case 15-E-0751, dated May 16, 2019.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\nTERM\nA minimum of one year and thereafter until terminated by 60 days written notice.\nDETERMINATION OF DEMAND\nContract Demand:\nA customer will have the option of accepting a contract demand (maximum potential demand at the facility to be\nprovided standby service) established by the Company or the customer can establish the contract demand.\nhe contract\n1. Company Established Contract Demand:\na.\nCustomer With OSG\nFor an Existing Customer, the contract demand will be established based on the maximum metered demand\nof that customer over the twelve (12) months prior to February 1, 2004, taking into consideration the output\nof existing OSG, the addition and/or removal of equipment, and the coincidence and diversity of the\nFor a new customer (i.e., a customer for whom historical metered demand does not exist) or an Existing\nCustomer where historical metered demand does not represent a reasonable contract demand level, the\ncontract demand will be determined, in consultation with the customer, by assessing the nameplate rating of\nthe equipment to be served, and projecting, through an engineering analysis, the coincidence and diversity\nThe contract demand of a wholesale generator, who is connected to and provides electricity supply to a\ncustomer who would otherwise take delivery service from the Company, will be set at the maximum\npotential metered demand of the station loads of the wholesale generator when the generator is out of\nservice, plus the maximum potential metered demand of the customer connected to, and generally provided\nelectricity supply by, the wholesale generator.\nSurcharge: Where a customer elects to have NYSEG establish the contract demand, that customer will not\nincur a surcharge if that contract demand is exceeded except as described in this paragraph. However, a\ncustomer shall be obligated to provide NYSEG with written notice prior to the installation or removal of\nequipment, or any change in operation, that can be reasonably expected to change in a material fashion\n(defined as a change of more than twelve and one-half percent (12.5%)) the system capacity required to\ndeliver electricity to the customer. If the customer fails to provide written notice, and the customer exceeds\nthe contract demand, NYSEG has the right to include a surcharge in the customer's subsequent bill equal to\nthe product of the applicable Contract Demand Charge, the amount of the exceedence, and the number of\nbilling periods from, and including, the billing period in which the customer first commenced taking\nstandby service from NYSEG at the understated contract demand, i.e., the billing period in which the\ncustomer installed the equipment or changed the operation that caused the exceedence (as demonstrated by\nthe customer to NYSEG in writing), through the billing period that includes the date of the exceedence. If\nthe customer fails to demonstrate in writing when it installed such equipment or changed such operation,\nthen NYSEG will apply the surcharge, each month, from the first billing period in which the customer\ncommenced taking standby service from NYSEG."},{"page":316,"startToken":71281,"endToken":71338,"text":"PSC No: 120 - Electricity\nLeaf No. 290.1\nNew York State Electric & Gas Corporation\nRevision: 1\nInitial Effective Date: January 1, 2024\nSuperseding Revision: 0\nIssued in compliance with Order in Case 15-E-0751, dated October 13, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\nReserved for Future Use"},{"page":317,"startToken":71338,"endToken":71761,"text":"PSC No: 120 - Electricity\nLeaf No. 291\nNew York State Electric & Gas Corporation\nRevision: 2\nInitial Effective Date: July 16, 2018\nSuperseding Revision: 1\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\n2. Customer Established Contract Demand:\nfacility and OSG. Subsequently, a customer may revise its contract demand downward by written notice to\nthe Company once every 12 months. The revised contract demand level cannot be set at a level lower than\nthe highest demand metered in the previous 12 months unless the customer demonstrates in writing to the\nCompany's reasonable satisfaction that electricity-consuming equipment is removed or disabled in place\n(not simply disconnected). The Company has the right to inspect the premises of a customer upon\nreasonable notice and at reasonable times in order to confirm that such energy-consuming equipment has\nbeen so removed or disabled in place (not simply disconnected).\nA customer may revise its contract demand upwards at any time upon written notice to the Company.\nSurcharge: Where the customer elects to establish its own contract demand and then exceeds the contract\ndemand, a surcharge shall apply to the current monthly bill equal to the following:\nExceeding Contract\nDemand\nExceeding Contract\nDemand\nExceeding Contract\nDemand\n0% to less than 10%\n10% to less than 20%\n20% or more occurs\n12 times the sum of the\nmonthly contract demand\ncharge amount calculated\nfor the excess demand\n18 times the sum of the\nmonthly contract demand\ncharge amount calculated\nfor the excess demand\n24 times the sum of the\nmonthly contract demand\ncharge amount calculated\nfor the excess demand\nWhere a new customer installs OSG, or an Existing Customer initially adds OSG, during a two year period\nbeginning February 1, 2004, one exceedence in the first year of OSG operation of less than 10% in\nmagnitude would be excused from the above surcharge. For purposes of this paragraph, the OSG shall be\nd.\nAs-Used Demand:\n1. The as-used demand for customers with interval metering shall be the aggregate of the highest daily 15-\nminute integrated demand (measured in kW) occurring during the On-\nng period. If in any billing period, there is a failure in the metered usage\ndata acquisition that results in the failure to record daily as-used demand data, the Company reserves the\nright to estimate reasonable values for the missing data for recording and billing purposes.\n2. The daily as-used demand, for customers without demand metering, and not billed at the OASC shall be\nthe monthly metered kilowatt hours."},{"page":318,"startToken":71761,"endToken":72092,"text":"PSC No: 120 - Electricity\nLeaf No. 292\nNew York State Electric & Gas Corporation\nRevision: 6\nInitial Effective Date: January 1, 2024\nSuperseding Revision: 5\nIssued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory , Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\nMETERING AND COMMUNICATION REQUIREMENTS:\n1.\nA customer with OSG and is demand-metered with 50 kW or more of Contract Demand shall be\nrequired to have interval metering and remote meter reading capability. Such customers will be\nresponsible for the following:\na) the incremental costs of interval metering equipment and its installation;\nb) the costs of providing remote meter reading capability through telecommunications to and\nfrom the meter; and\nc) the costs associated with resolution of any problems with the telecommunications provider,\nincluding reimbursing the Company for any expenses the Company incurs.\n2. A customer who provides telecommunications to the meter shall be responsible for all costs\nassociated with the installation, operation and maintenance of the telecommunications line, including but\nnot limited to, all telecommunications service bills.\nIf the Company is unable to read the meter through a customer provided connection, and the Company\nhas determined that the problem is not caused by the Company's equipment, the customer shall be\nresponsible for resolution of the problem. The customer shall also be responsible for reimbursement of\nCompany expenses incurred for visits to the meter location to ascertain the cause of the problem. To the\nextent the Company installs an interval meter with telecommunication capability, the Company may\nassess the incremental fees to the customer.\n3. Meter Credits:\na) Meter Owned By Customer, Installed And Maintained By The Company: A qualified customer\nthat elects to own its own meters, as described in Section 3.A.2 of PSC No. 119 - Electricity,\nService Connections, Meter Owned by Customer, Installed and Maintained by the Corporation,\nshall receive a Meter Ownership Credit as described in Section 3.A.2.a.i. of that Schedule."},{"page":319,"startToken":72092,"endToken":72466,"text":"PSC No:  120 - Electricity \n \n \nLeaf No. 293 \nNew York State Electric & Gas Corporation \n \n \nRevision:  33 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  31 \nIssued in compliance with Order in Case No. 25-E-0375, dated May 14, 2026. \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York \n \n \n \nSERVICE CLASSIFICATION NO. 11 (Continued) \n \nMETERING AND COMMUNICATION REQUIREMENTS: (CONT’D) \n \n \n3.  Meter Credits: (Cont’d) \nb)  Customers That Have Fully Paid for Meter and Instrument Transformation Costs:  A demand \nbilled customer taking service under these standby rates that has fully paid for their meter and \ninstrument transformation costs shall receive a monthly credit to the currently applicable monthly \nCustomer Charge as well as a portion of the standby service transition dollars allocated for \ncollection in the Customer Charge.  Below are the customer credits: \n \n \nCustomer Charge \nCredit \nDelivery Charge \nS.C. 2 \nS.C. 3P \nS.C. 3S \nS.C. 7-1 \nS.C. 7-2 \nS.C. 7-3 \nS.C. 7-4 \n \nEffective Date:  \n06/01/2026 \n$0.94 \n$14.98 \n$23.40 \n$3.94 \n$15.99 \n$23.85 \n$183.68 \n \n \nELECTRICITY SUPPLY   \nA Customer taking service under S.C. No. 11 shall have the choice of the following Supply Service Options for its \nElectricity Supply: \n \n \nFor customers whose OASC is Service Classification No. 1, 6, 8, 9, or 12: \n1. ESCO Supply Service (ESS); or  \n2. NYSEG Supply Service (NSS) \nFor a customer whose OASC is Service Classification No. 2, 3, or a Service Classification No. 7: \n1. ESCO Supply Service (ESS); or \n2. NYSEG Supply Service (NSS); or \n3. Hourly Pricing* \n* As set forth in General Information Section 25.I.F., Customer Eligibility Criteria, certain demand billed customers \nare required to participate in Mandatory Hourly Pricing. \n \nTerms and conditions applicable to these rate choices are explained in the customer’s OASC.  All customers served \nunder this Service Classification taking electricity supply service from the Company shall be required to pay a \nMerchant Function Charge as set forth in the customer’s OASC.    \n \nINTERCONNECTION REQUIREMENTS \n1.  A customer may connect an OSG facility for parallel operation with the Company’s delivery system or \nisolate for operation with standby service provided by a wholesale generator by means of a double throw \ntransfer switch, or another transfer switching scheme acceptable to the Company."},{"page":320,"startToken":72466,"endToken":72950,"text":"PSC No: 120 - Electricity\nLeaf No. 294\nNew York State Electric & Gas Corporation\nRevision: 4\nInitial Effective Date: December 1, 2016\nSuperseding Revision: 3\nIssued in compliance with Order in Case 16-E-0497, dated November 17, 2016.\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\nINTERCONNECTION REQUIREMENTS (CONT’D.)\n2. A customer must complete an Application for Service and must operate in compliance with standards\nand requirements set forth in either the Distributed Generation Interconnection Requirements found in\nSection 9 of Schedule P.S.C. No. 119, and in Addendum-SIR of P.S.C. No. 119 entitled “New York State\nStandard Interconnection Requirements for New Generation Units 5 MW or Less Connected in Parallel\nwith Utility Distribution Systems” or the Company’s Bulletin 86-01, entitled “Requirements for\nIndependent Power Producers of Electricity.” In addition, customers must execute either the New York\nState Standardized Contract For Interconnection of New Distributed Generation Units With Capacity 5 MW\nor Less Connected in Parallel with Utility Distribution Systems (“SIR Contract”), as contained within\nAddendum-SIR of P.S.C. No. 119, or the applicable contract.\n3. A customer and the Company shall agree as to the operating mode, interconnection and equipment\nspecifications for the OSG facility pursuant to either a or b below, as may be amended or superseded:\na)\nthe SIR Contract contained within Addendum-SIR of P.S.C. No. 119, or\nb)\nthe Company’s Bulletin 86-01.\n4. A customer shall be responsible for all costs associated with its OSG interconnection as set forth in the\nrequirements listed in paragraphs 3a or 3b above, as applicable.\n5. Contribution toward CT & VT Costs: For installations requiring Current Transformers (CTs) and\nVoltage (or Potential) Transformers (VTs), to the extent that a customer, as part of its original\ninterconnection with the Company’s system, paid for and installed CTs and VTs or compensated the\nCompany for those costs up-front, the customer shall receive a monthly bill credit, as mutually agreed upon\nby the Company and the customer.\n6. Maintenance Schedules: A customer applying for standby service with a standby contract demand\ngreater than 2,000 kW is required to provide the Company with a schedule of OSG maintenance. A\nschedule must include the dates and times for the beginning and ending of all planned outages. A customer\nmay revise the schedule one month prior to the effective date of the outage. However, modifications\ncommunicated with less than one month’s notice shall not be allowed, unless the customer obtains Company\napproval. The annual provision of planned maintenance schedules by the customer shall take place on\nOctober 1 of each year for standby service for the following calendar year. Such schedule shall be utilized\nby the Company for planning functions. This provision does not take precedence with respect to any OSG\nmaintenance provision in a power purchase agreement that may be in effect with the Company."},{"page":321,"startToken":72950,"endToken":73447,"text":"PSC No: 120 - Electricity\nLeaf No. 294.1\nNew York State Electric & Gas Corporation\nRevision: 10\nInitial Effective Date: June 1, 2021\nSuperseding Revision: 9\nIssued in compliance with order in Case No. 19-E-0079, dated May 14, 2021.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\n7. At the time of agreement, the customer with an OSG greater than 300 kVA, excluding Net Metered Farm\nWaste Generators less than 2,000 kW, may select the payment method for paying the Company operations\nand maintenance charges on the interconnection equipment paid for by the customer but owned by the\nCompany. The customer may select to pay either the actual charges for maintenance, as they may occur, or\ncase proceedings) on the total investment in such equipment. The operations and maintenance costs on\nsuch equipment is billed on a monthly basis pursuant to the applicable contract or agreement.\n8. NAERC Guidelines: A customer taking standby service shall comply with all reliability criteria,\nthe same may be amended or superseded. Such compliance is necessary to ensure the continued reliability\nof North America's interconnected electric transmission electric systems.\nUNAUTHORIZED OSG INTERCONNECTION BY CUSTOMER:\nIf a customer connects OSG to its electric system without: (a) notifying the Company; and (b) executing an\nappropriate standby service Application, and thereafter the Company discovers the interconnection, the Company\nshall backbill the customer for all standby service rendered subsequent to the estimated connection of such OSG.\nIn preparing such backbills, the Company shall assess a standby service contract demand surcharge provision equal\nto two times that which would otherwise be computed under the Determination of Demand Provision, paragraph 1\n(Company Established Contract Demand) of this Service Classification, and assume the standby contract demand\nhad been inappropriately established at 0 kW.\nSPECIAL PROVISIONS FOR CUSTOMERS WITH ON-SITE GENERATION\n(a) Demand Metered Customer With Less Than 50 kW of Contract Demand:\nA customer with a contract demand of less than 50 kW without interval metering shall be billed at the OASC. A\ncustomer with a contract demand of less than 50 kW can choose to be served at the standby rate, provided that the\ncustomer pays all one-time and ongoing costs associated with the purchase and installation of an interval meter, and\n.C.\nNo. 11 tariff.\n(b) Small Customer Exclusion:\nSmall customers, defined as those customers qualifying for service under Service Classification Nos. 1, 6, 8, 9, and\n12, shall be billed at the OASC rate instead of the standby service rate in S.C. No. 11. This exemption shall be\ndiscontinued upon the date that 200 such standby customers located east of Total East or 250 such standby customers\nwest of Total East are billed under this provision, provided, however, that the discontinuance of this exemption shall\nnot affect any customer that received the exemption prior to the date of discontinuance, which customers shall\ncontinue to receive the exemption until the conclusion of the phase-\nRate Phase-"},{"page":322,"startToken":73447,"endToken":73950,"text":"PSC No: 120 - Electricity\nLeaf No. 294.2\nNew York State Electric & Gas Corporation\nRevision: 1\nInitial Effective Date: July 1, 2019\nSuperseding Revision: 0\nIssued in compliance with Order in Case 15-E-0751, dated May 16, 2019.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\nSPECIAL PROVISIONS FOR CUSTOMERS WITH ON-SITE GENERATION\n(c) Individually Negotiated Contracts\n1) Individual Agreements for Customers Considering Isolation\nNYSEG is authorized to offer individually negotiated agreements for standby service to customers that may\ninstall back-up generation and disconnect their premises from the NYSEG system in lieu of taking tariff\nstandby service. The customer must document that it can physically, environmentally, and economically\nisolate from NYSEG's grid by installing and operating back-up generation at a lower cost than paying for\nstandby service, and that such option is the alternative the customer will select if NYSEG does not offer a\nnegotiated rate alternative. At a minimum, the negotiated rate agreement must provide for recovery of\nwill use its existing authorization under Service Classification No. 14 to gain contribution from any\ncustomer presently isolated from its delivery system. NYSEG will respond to a customer application for a\nnegotiated rate agreement within ninety (90) days of its receipt, with a negotiated rate agreement offer or a\nwritten explanation for its rejection of the application. Either party may seek from Staff a non-binding\nresolution of a dispute over the negotiation of such an individual rate agreement\nIn the event of a conflict between any provisions of an agreement negotiated pursuant to this authority and\n-E-0779 or the standby rates\nprovisions of NYSEG's tariff on the same subject, the provision of the negotiated agreement shall take\nprecedence and control.\n2) Individual Agreements for Customers Selling into the Wholesale Market\nNYSEG is authorized to offer individually negotiated agreements for standby service with customers that\nsell into the market, or to a third party, no less than 90% of their site's energy output, net of station power\nrequirements, from generators located on the site having a total name plate rating equal to or greater than 50\nMW. The rates and charges negotiated will reflect, where applicable, the characteristics of the specific\ninterconnection arrangements, including, but not limited to, the voltage level of the interconnection, whether\nthe interconnection is bi-directional, and the nature of the NYSEG facility where the generator is\ninterconnected with the NYSEG system.\nNYSEG will respond to a customer application for a negotiated rate agreement within ninety (90) days of\nits receipt with a negotiated rate agreement offer or a written explanation for its rejection of the application.\nEither party may seek from Staff a non-binding resolution of a dispute over the negotiation of such an\nindividual rate agreement.\nIn the event of a conflict between any provision of an agreement negotiated pursuant to this authority and\nany provision o\n-E-0779 or the standby rates\nprovisions of NYSEG's tariff on the same subject, the provision of the negotiated agreement shall take\nprecedence and control."},{"page":323,"startToken":73950,"endToken":74014,"text":"PSC No: 120 - Electricity\nLeaf No. 294.3\nNew York State Electric & Gas Corporation\nRevision: 2\nInitial Effective Date: July 1, 2016\nSuperseding Revision: 0\nIssued in compliance with Order in Case 15-E-0283, dated June 15, 2016\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\nSPECIAL PROVISIONS (CONT’D.)\n(d) Reserved for Future Use"},{"page":324,"startToken":74014,"endToken":74075,"text":"PSC No: 120 - Electricity\nLeaf No. 294.4\nNew York State Electric & Gas Corporation\nRevision: 2\nInitial Effective Date: July 1, 2016\nSuperseding Revision: 0\nIssued in compliance with Order in Case 15-E-0283, dated June 15, 2016\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\n(d) Reserved for Future Use"},{"page":325,"startToken":74075,"endToken":74136,"text":"PSC No: 120 - Electricity\nLeaf No. 294.5\nNew York State Electric & Gas Corporation\nRevision: 2\nInitial Effective Date: July 1, 2016\nSuperseding Revision: 0\nIssued in compliance with Order in Case 15-E-0283, dated June 15, 2016\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\n(d) Reserved for Future Use"},{"page":326,"startToken":74136,"endToken":74197,"text":"PSC No: 120 - Electricity\nLeaf No. 294.6\nNew York State Electric & Gas Corporation\nRevision: 3\nInitial Effective Date: September 9, 2016\nSuperseding Revision: 2\nIssued in compliance with Order in Case 15-E-0283, dated June 15, 2016.\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\n(d) Reserved for Future Use"},{"page":327,"startToken":74197,"endToken":74258,"text":"PSC No: 120 - Electricity\nLeaf No. 294.7\nNew York State Electric & Gas Corporation\nRevision: 4\nInitial Effective Date: July 1, 2016\nSuperseding Revision: 2\nIssued in compliance with Order in Case 15-E-0283, dated June 15, 2016\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\n(d) Reserved for Future Use"},{"page":328,"startToken":74258,"endToken":74319,"text":"PSC No: 120 - Electricity\nLeaf No. 294.8\nNew York State Electric & Gas Corporation\nRevision: 3\nInitial Effective Date: July 1, 2016\nSuperseding Revision: 0\nIssued in compliance with Order in Case 15-E-0283, dated June 15, 2016\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\n(d) Reserved for Future Use"},{"page":329,"startToken":74319,"endToken":74380,"text":"PSC No: 120 - Electricity\nLeaf No. 294.9\nNew York State Electric & Gas Corporation\nRevision: 3\nInitial Effective Date: July 1, 2016\nSuperseding Revision: 0\nIssued in compliance with Order in Case 15-E-0283, dated June 15, 2016\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\n(d) Reserved for Future Use"},{"page":330,"startToken":74380,"endToken":74441,"text":"PSC No: 120 - Electricity\nLeaf No. 294.10\nNew York State Electric & Gas Corporation\nRevision: 2\nInitial Effective Date: July 1, 2016\nSuperseding Revision: 0\nIssued in compliance with Order in Case 15-E-0283, dated June 15, 2016\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\n(d) Reserved for Future Use"},{"page":331,"startToken":74441,"endToken":74502,"text":"PSC No: 120 - Electricity\nLeaf No. 294.11\nNew York State Electric & Gas Corporation\nRevision: 2\nInitial Effective Date: July 1, 2016\nSuperseding Revision: 0\nIssued in compliance with Order in Case 15-E-0283, dated June 15, 2016\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\n(d) Reserved for Future Use"},{"page":332,"startToken":74502,"endToken":75045,"text":"PSC No: 120 - Electricity\nLeaf No. 294.12\nNew York State Electric & Gas Corporation\nRevision: 10\nInitial Effective Date: January 1, 2024\nSuperseding Revision: 9\nIssued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory , Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\nSPECIAL PROVISIONS FOR CUSTOMERS WITH ON-\n(d) Reserved for Future Use\nCustomers who qualify for the Recharge NY Power Program pursuant to Section 11 of the General Information\nSection of this Schedule, shall have such power billed in accordance with the provision therein as provided in\nSection 11, the maximum metered demand shall be used in the load share calculation for all standby customer.\nThe customer's power requirements in excess of the RNY Power allocation shall be billed in accordance with the\nESCO Supply Service rate or the NYSEG Supply Service rate of this Service Classification.\n(f) Reliability Credit\n1.\nStandby customers with OSG shall be provided an opportunity to earn credits against their contract demand\ncharges. The credit would be earned by reliably reducing load below the contract demand over a defined\nMeasurement Period. During the 5-year phase-in period, the calculation of the Reliability Credit shall be based\n-in Contract Demand Charge. A customer that elects to be billed at the new\nrates in lieu of the phase-in shall no longer be eligible to receive a Reliability Credit. The Reliability Credit will\nbe phased out and completely eliminated effective January 1, 2029, for all customers.\n2.\nFor purposes of this Credit, the Measurement Period is weekdays from 7:00 am to 10:00 pm during the previous\ntwo consecutive full Summer periods; provided however, that the first year in which a customer seeks a Credit,\nthe Measurement Period is weekdays from 7:00 am to 10:00 pm during the previous full Summer period only.\nThe Measurement Period shall exclude Outage Events, as selected by the customer, as well holidays (i.e.,\nIndependence Day (observed) if it falls on a weekday and Labor Day).\nFor purposes of this Credit, the Summer Period is June 1 through September 30.\n3.\nOutage Events are up to three time blocks for each Summer Period that, in aggregate, are comprised of no more\nthan five 24-hour time periods, excluding weekends and holidays. If a time block contains a time period of less\nthan 24 hours, the time period shall be rounded up to the next 24 hours (i.e., the 24-hour periods cannot be\napplied on a partial basis). If a time block encompasses a holiday or weekend, the start of the 24-hour period on\nthe day prior to the holiday or weekend until the same hour the next business day shall be considered to be a\nsingle 24-hour period.\n4.\nThe Credit for any Measurement Period shall be equal to\nrevenue meter (net of\ngeneration), multiplied by the Contract Demand Delivery Charge per kW that is in effect on October 1 of the\nyear in which the Credit is determined. The Credit shall\ncustomer bills commencing in November until the following October. If a customer is billed under Special\nProvision (g) of this Service Classification, the Outage Events for all Recipient Accounts shall be the same and\nshall be calculated individually."},{"page":333,"startToken":75045,"endToken":75203,"text":"PSC No: 120 - Electricity\nLeaf No. 294.12.1\nNew York State Electric & Gas Corporation\nRevision: 0\nInitial Effective Date: January 1, 2024\nSuperseding Revision:\nIssued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\n(f) Reliability Credit (Cont d)\n5. A customer seeking a Credit must request such credit by October 14 of each year for which the Credit it\nsought and, at the same time, specify the Outage Events the Customer requests to be excluded from the\nmeasurement period. If October 14 falls on a weekend or holiday, the Company shall accept requests until\nthe next business day. Prior to October 14, the Company shall notify Customers of their need to request the\napplicable Credit.\n6.\nCredits provided to standby customers shall be recovered from all customers, including standby customers,\nthrough the applicable Transition Charge [Non-Bypassable Charge\n."},{"page":334,"startToken":75203,"endToken":75586,"text":"PSC No: 120 - Electricity\nLeaf No. 294.13\nNew York State Electric & Gas Corporation\nRevision: 1\nInitial Effective Date: July 1, 2019\nSuperseding Revision: 0\nIssued in compliance with Order in Case 15-E-0751, dated May 16, 2019.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\nSPECIAL PROVISIONS FOR CUSTOMERS WITH ON-\n(g) Standby Offset\nA customer with qualifying on-\nexcess generation to supply two or more Standby Supplied Accounts as long as all of the requirements in\nthis provision are met.\nDefinitions\nStandby Generation Account: The customer meter where the generating equipment is located and\ntion system.\nStandby Supplied Accounts: Additional meters billed under this standby service class designated by\nthe Standby Generation Account for the application of excess generation that meet the Standby\nSupplied Account requirements listed below.\nEligibility\n1.\nStandby Generation Account\na.\nover 2 MW but no more than 20 MW; and (ii) meet eligibility criteria for designation as efficient\npursuant to the order of the Public Service Commission, dated January\n23, 2004, in Case 02-E-0779, except with respect to maximum generating capacity. The\ngenerating facility may have more than one generating unit so long as the aggregate nameplate\nrating conforms to (i) above\nb.\nThe Standby Generation Account must have interval metering and meet the interval metering and\ntelecommunication requirements of this service class before they will be eligible for the offset\nprovision. The meter and telecommunications for the account associated with the Standby\nmust be provided and maintained at the c\nexpense, and must be operational before the customer may take service under this provision.\nc.\nAll interconnection requirements of this service class must be met before an account will be\neligible for the offset provision. In addition, the interconnection must be technically and\neconomically practicable, and the connection and operation of such facility shall not jeopardize the\nfacilities, or other customers.\nd.\nAccounts that are eligible for net metering, remote net metering, community net meter, standby\nexemption, NYPA allocations including RNY, or economic development rates are not eligible for\nthis offset provision.\ne.\nEach Standby Generation Account will be billed with the applicable standby service rates in this\nservice class.\nf.\nEach Standby Generation Account is eligible for the supply options as described in this service\nclass."},{"page":335,"startToken":75586,"endToken":75912,"text":"PSC No: 120 - Electricity\nLeaf No. 294.14\nNew York State Electric & Gas Corporation\nRevision: 3\nInitial Effective Date: January 1, 2024\nSuperseding Revision: 2\nIssued in compliance with Order in Case 15-E-0751, dated October 13, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\nSPECIAL PROVISIONS FOR CUSTOMERS WITH ON-\n(g) Standby Offset\nEligibility\n1.\nStandby Generation Account\ng.\nCustomers that have a Standby Generation Account may take serv\nBack service, Service Classification No. 10, if the export of the generating facility exceeds the\naggregate registered kWh usage on the Standby Generation Accounts and the Standby Supplied\nAccounts.\n2.\nStandby Supplied Accounts\nThe Standby Supplied Accounts designated by the Standby Generation Account customer must all be\na.\nThe Standby Generation Account and the Standby Supplied Accounts designated by the customer\nto receive the output of the generating facility may be established in two or more customer\n-\n(1) at least one of the Standby Supplied Accounts must be in the same customer name as the\nhave a Contract Demand equal to 10% or more of the nameplate rating of the generating\nfacility;\n(2) the Sponsor shall be responsible for coordinating the interconnection and operation of the\ngenerating facility with the Company; and\n(3) at the time of application under the Multi-Party Offset, the Sponsor must submit a signed\napplication for all Standby Supplied Accounts to be supplied by the\nsigned Percentage Allocation Form. Both\nforms shall be available on\nb.\nThe Standby Generation Account, and the Standby Supplied Accounts must all be located within a\n(1)\nand/or parcel of land proximate to each other if there is common use, whether or not such\nAll of the Standby Supplied\nmust be within the same load zone as determined by the Locational Based Market Price. The\naccounts of a customer whose buildings or parcels of land are not physically interconnected\nc\nproximity and common Company facilities to the Company."},{"page":336,"startToken":75912,"endToken":76172,"text":"PSC No: 120 - Electricity\nLeaf No. 294.14.1\nNew York State Electric & Gas Corporation\nRevision: 2\nInitial Effective Date: January 1, 2024\nSuperseding Revision: 1\nIssued in compliance with Order in Case 15-E-0751, dated October 13, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\nSPECIAL PROVISIONS FOR CUSTOMERS WITH ON-\n(g) Standby Offset\nEligibility\n2.\nStandby Supplied Accounts\n(2)\nUnder Multi-\ne building or multiple buildings in\nwhich each customer is connected to the generating facility by private thermal loop that\ndelivers steam, hot water, or chilled water.\nc.\nEach Standby Supplied Account shall have no other source of generation located on the premises\nand shall not participate under the provisions of remote net metering, net metering for customer\ngenerators, or Community Distributed Generation.\nd.\nEach Standby Supplied Account and the export of the Standby Generation Account must be\nseparately metered using Commission-approved, revenue grade, interval metering with\ner reading systems and\ncommunication systems.\ne.\nEach Standby Supplied Account shall be billed with the applicable standby service rates in this\nservice class.\nf.\nEach Standby Supplied Account must have interval metering and meet the interval metering and\ntelecommunication requirements of this service class before they shall be eligible for the offset\nprovision. The meter and telecommunications for each Standby Supplied Account must be\nprovided and maintained at the customer\nexpense, and must be operational before the customer\nmay take service under this provision.\ng.\nEach Standby Supplied Account is eligible for the supply options as described in this service class."},{"page":337,"startToken":76172,"endToken":76583,"text":"PSC No: 120 - Electricity\nLeaf No. 294.15\nNew York State Electric & Gas Corporation\nRevision: 3\nInitial Effective Date: July 1, 2019\nSuperseding Revision: 2\nIssued in compliance with Order in Case 15-E-0751, dated May 16, 2019.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\nSPECIAL PROVISIONS FOR CUSTOMERS WITH ON-\n(g) Standby Offset\n3.\nBilling Applicable to Each Standby Supplied Account\na. Customer Charge\nThe Customer Charge and meter charges for each account (the Standby Generation Account and the\nStandby Supplied Accounts) shall be equal to the customer and meter charges listed in this service class\nplus the additional Customer Charge listed below.\nb. Contract Demand\nThe Contract Demand for each account (the Standby Generation Account and the Standby Supplied\nAccounts) shall\nserve that individual account, including the delivery of supply from all sources.\n4.\nFor Accounts Supplied under the Single Party Offset:\nFor purposes of this Offset Provision, the following definitions apply:\n-\nmeans, for each Standby Supplied Account supplied by the\nexcess generation, the demand registered on the Standby Supplied Account\nmeter(s) multiplied by the lower of: (a) 1 or (b) the ratio of the\ngeneration measured in kilowatts to the sum of demands on the meters of all Standby Supplied Accounts.\nmeans, for each Standby Supplied Account supplied by the Standby\ntotal kWhs\nmultiplied by the lower of: (a) 1 or (b) the ratio of the\nexcess generation\nmeasured in kWhs to the sum of the kWhs registered on the meters of the Standby Supplied Accounts.\nAllocated As-used Generator Demand and Allocated Generator Supply shall be determined for each 5-\nminute interval. Adjustments shall be made for transformation losses as applicable.\n5.\nFor Accounts Supplied under the Multi-Party Offset:\nFor purposes of this Offset Provision, the following definitions apply:\n-\nStandby Supplied Account, the lower of: (a) the\ndemand registered on the Standby Supplied Account or (b) the demand registered on the meter(s) measuring\nStandby Supplied\nf the\nStandby Supplied\nthe demand registered on the Standby Supplied Account, the excess amount shall not be redistributed to\nother accounts nor carried forward to the succeeding billing period.\nStandby Supplied Account, the lower of: (a) the total kWhs\nregistered on the Standby Supplied\nkWhs registered on the meter(s)\nmeasuring the generati\nStandby Supplied\nStandby Supplier\nAllocation exceeds the kWhs\nthe excess amount shall be\ncredited to the extent described in Service Classification 11, Special Provision (g)1.b."},{"page":338,"startToken":76583,"endToken":76933,"text":"PSC No: 120 - Electricity\nLeaf No. 294.15.1\nNew York State Electric & Gas Corporation\nRevision: 1\nInitial Effective Date: July 1, 2019\nSuperseding Revision: 0\nIssued in compliance with Order in Case 15-E-0751, dated May 16, 2019.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\nSPECIAL PROVISIONS FOR CUSTOMERS WITH ON-\n(g) Standby Offset\n5.\nFor Accounts Supplied under the Multi-Party Offset\n:\nthat the Sponsor has\nallocated to each Standby Supplied Account under the Multi-Party Offset. A single percentage shall be\napplied to both the Allocated As-Used Generator Demand and the Allocated Generator Supply.\nThe Percentage Allocations must total 100%, of which the Sponsor must establish:\na.\na Percentage Allocation of 10% or more to a single Standby Supplied Account in the\nb.\na Percentage Allocation of no less than 5% or more than 90% to each additional Standby\nSupplied Account. The Standby Supplied Accounts and the Percentage Allocation to each\nmust be assigned in writing by the Sponsor, using the Percentage Allocation Form, at least 30\ndays before commencing service under the Multi-Party Offset. The Percentage Allocations\nand the Standby Supplier Accounts may be changed as described on the form. No credits shall\nbe applied if the Sponsor ceases to have a Standby Supplied Account or ceases to own or\noperate the generating facility. If a Standby Supplied Account is closed, its credits shall be\n6.\nEach Standby Supplied Account shall be billed under Standby Service rates listed in this service class, as\nmodified below:\na.\nAn additional Customer Charge of $50.00 per account per billing period, shall be applicable\nto cover incremental billing and administrative costs associated with providing service under\nthis provision.\nb.\nThe per-kWh delivery charges and adjustments described in this service class shall be applied\nto the total kWhs\nSupply for each 5-minute interval (adjusted for losses as applicable).\nc.\nFor each 5-minute interval, the registered de\nshall be reduced\nby the Allocated Generator Demand for purposes of determining the daily maximum demand\nthat is used for billing As-used Daily Demand Delivery Charges."},{"page":339,"startToken":76933,"endToken":77209,"text":"PSC No: 120 - Electricity\nLeaf No. 294.16\nNew York State Electric & Gas Corporation\nRevision: 3\nInitial Effective Date: July 1, 2019\nSuperseding Revision: 2\nIssued in compliance with Order in Case 15-E-0751, dated May 16, 2019.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Binghamton, New York\nSERVICE CLASSIFICATION NO. 11 (Continued)\nSPECIAL PROVISIONS FOR CUSTOMERS WITH ON-\n(g) Standby Offset\nBilling Applicable to Each Standby Supplied Account\n6. Each Standby Supplied Account shall be billed under Standby Service rates listed in this service class,\nas modified below:\nd.\nIf the Customer purchases supply from the Company, the per-kWh supply charges and\nadjustments described in this service class shall be applied to the total kilowatthours\n5-\nminute interval (adjusted for losses as applicable).\n7. The Allocated As-used Generator Demand and Allocated Generator Supply shall be assumed to be zero\nfor time periods where there is insufficient interval data available to ascertain that the Generating\nFacility supplied output to any associated Standby Service account.\n8. The Reactive Charge shall be calculated as described in this service class and shall not be adjusted by\nthis provision.\n(h) 1. A customer that is not participating in Special Provision (f.) or Special Provision (g.) herein may opt to\nparticipate in Rule 40.B, Value Stack, with a qualifying generator (i.e. a CES Tier 1 eligible generator as provided in\nRule 40.B.1.a.iii) for compensation of net hourly injections. The Company shall install appropriate metering capable\nof recording the net hourly consumption and injection for the customer. The customer shall be responsible for the\ncost of the meter, the installation, and any additional costs."},{"page":340,"startToken":77209,"endToken":77226,"text":"New York State Electric & Gas Corporation \nService Classification 15: Optional Demand Service \nOtherwise Applicable Service Class 7"},{"page":341,"startToken":77226,"endToken":77678,"text":"PSC No: 120 - Electricity\nLeaf No. 325\nNew York State Electric & Gas Corporation\nRevision: 0\nInitial Effective Date: January 1, 2024\nSuperseding Revision:\nIssued in compliance with Order in Case 15-E-0751, dated October 13, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 15\nOPTIONAL DEMAND SERVICE RATE\nAPPLICABLE TO USE OF SERVICE FOR:\nA customer without On Site Generation (OSG), or a customer that installs OSG with a total nameplate rating less\nthan 15% of its load, may opt to take service pursuant to this service classification.\nThis service classification s rates, terms, and requirements are for informational purposes and will be available on a\nphased in approach at a future date consistent with Order issued on October 13, 2023, under Case No. 15-E-0751.\nCHARACTER OF SERVICE:\nContinuous, Alternating Current -\nvailable and appropriate\nfor the Customer s requirement.\nA customer that installs OSG with a total nameplate rating less than 15% of its load shall comply with all federal,\nstate and local laws, regulations, and requirements, including the requirements listed below in the Interconnection\nRequirements paragraphs 1 through 7.\nRATE PERIODS:\nSummer Super-Peak hours\nFrom 2:00 pm until 6:00 pm Summer months are June, July, August, and\nSeptember\nWinter Super-Peak hours\nFrom 5:00 pm until 9:00 pm Winter months are December, January, and\nFebruary\nSummer On-Peak hours\nFrom 7:00 am until 2:00 pm\nand\nFrom 6:00 pm until11:00 pm\nWinter On-Peak hours\nFrom 7:00 am until 5:00 pm\nand\nFrom 9:00 pm until 11:00 pm\nShoulder On-Peak hours\nFrom 7:00 am until 11:00 pm Non-Summer months are October, November,\nMarch, April, and May\nOff-Peak hours\nAll other hours including\nHolidays*\n* Holidays: New Year s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and\nChristmas Day\nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS:\nCustomers may select from two different Supply Service Options as described below. The Company shall offer a\nRetail Access rate choice and a Non-Retail Access rate choice.\nThe Retail Access choice (see below) is the ESCO Supply Service (ESS). The Company shall provide only delivery\nservice for the Retail Access choice. Electricity supply is provided by an E\nThe Non-Retail choice is Hourly Pricing. The Company shall provide delivery service and commodity service for\nthe Non-Retail Access choice.\n1.\nESCO Supply Service (ESS)\nThis Retail Access choice includes fixed components for the Company delivery service, a Transition Charge as\ndescribed in Section 25.I.B, and a Bill Issuance Charge. Electricity supply is provided by an ESCO and settled\nas described in Section 16.E.9. Delivery Rates are specified in the Delivery Charges section of this Service\nClassification."},{"page":342,"startToken":77678,"endToken":77917,"text":"PSC No:  120 - Electricity \n \n \nLeaf No. 326 \nNew York State Electric & Gas Corporation \n \n \nRevision:  2 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision: 0  \nIssued in compliance with Order in Case 25-E-0375, dated May 14, 2026. \n \n \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York \nSERVICE CLASSIFICATION NO. 15 \n \nOPTIONAL DEMAND SERVICE RATE (CONT’D) \n \n \nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (cont’d) \n \n2. Hourly Pricing \nThis Non-Retail Access choice includes fixed components for the Company delivery service, a Transition \nCharge as described in Section 25.I.B, a Bill Issuance Charge, and a commodity charge that fluctuates with the \nmarket price of electricity as described in Section 25.I.C. Electricity supply is provided by the Company.  \nDelivery Rates are specified in the Delivery Charges section of this Service Classification. \n \nRATES:  \nDelivery Charges: The rate components of the delivery portion of this service: Customer Charge, Bill Issuance \nCharge, Contract Demand Charge and Daily As-Used Demand Charge.  \n \n1. Customer Charges \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \nBill Issuance Charge (per bill): $0.89, as described in General Information Section 16.J. \n \nCustomer Charge, Per \ncustomer, per month. \nEffective Date \nCustomer's OASC: \n6/01/2026 \nSC No. 1 \n$19.00 \nSC No. 2 \n$22.00 \nSC No. 3 - Primary \n$185.00 \nSC No. 3 - Subtransmission \n$450.00 \nSC No. 6 \n$22.00 \nSC No. 7-1 \n$375.00 \nSC No. 7-2 \n$1,350.00 \nSC No. 7-3 \n$3,000.00 \nSC No. 7-4 \n$5,900.00"},{"page":343,"startToken":77917,"endToken":77988,"text":"PSC No:  120 - Electricity \n \n \nLeaf No. 326.1 \nNew York State Electric & Gas Corporation \n \n \nRevision:  2 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision: 0   \nIssued in compliance with Order in Case 25-E-0375, dated May 14, 2026. \n \n \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York \n \nSERVICE CLASSIFICATION NO. 15 \n \nOPTIONAL DEMAND SERVICE RATE (CONT’D) \n \n \nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: (cont’d) \nRATES:  (Cont’d) \n \nReserved for Future Use"},{"page":344,"startToken":77988,"endToken":78234,"text":"PSC No:  120 - Electricity \n \n \nLeaf No. 327 \nNew York State Electric & Gas Corporation \n \n \nRevision:  2 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision: 0   \nIssued in compliance with Order in Case 25-E-0375, dated May 14, 2026. \n \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York \n \n \nSERVICE CLASSIFICATION NO. 15 \n \nOPTIONAL DEMAND SERVICE RATE (CONT’D) \n \nRATES: (cont’d) \n \n2. Contract Demand Charge: The Contract Demand Charge is determined by multiplying the Customer’s \nContract Demand times the Contract Demand rate.  \n \nContract Demand Charge: Per \nkW of Contract Demand  \n \nCustomer's OASC: \nEffective \nDate \n6/01/2026 \nSC No. 1 \n$7.40 \nSC No. 2 \n$5.13 \nSC No. 3 - Primary \n$9.24 \nSC No. 3 - Subtransmission \n$1.28 \nSC No. 6 \n$14.34 \nSC No. 7-1 \n$1.49 \nSC No. 7-2 \n$5.02 \nSC No.7-3 \n$0.00 \nSC No. 7-4 \n$0.08 \n \n3. As-Used Demand Charge: Daily As-Used Demand Charge, per kW of daily metered demand, during On-Peak \nand Super-Peak hours, as applicable. \n \n \nEffective Date \n \n6/01/2026 \nCustomer's OASC: \nOn-Peak \nSuper-Peak \nSC No. 1 \n$0.10478 \n$0.20957 \nSC No. 2 \n$0.31697 \n$0.63393 \nSC No. 3 - Primary \n$0.19838 \n$0.39677 \nSC No. 3 - Subtransmission \n$0.20352 \n$0.40704 \nSC No. 6 \n$0.13133 \n$0.26265 \nSC No. 7-1 \n$0.35962 \n $0.71925  \nSC No. 7-2 \n$0.21056 \n $0.42113  \nSC No. 7-3 \n$0.10733 \n $0.21466  \nSC No. 7-4 \n$0.06030 \n $0.12060  \n \n \n4. Transition Charge: \n \nAll kWh \n \n \n \n \nPer Transition Charge Statement."},{"page":345,"startToken":78234,"endToken":78303,"text":"PSC No:  120 - Electricity \n \n \nLeaf No. 327.1 \nNew York State Electric & Gas Corporation \n \n \nRevision:  2 \nInitial Effective Date: June 1, 2026 \n \n \nSuperseding Revision:  0 \nIssued in compliance with Order in Case 25-E-0375, dated May 14, 2026. \n \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Binghamton, New York \n \n \nSERVICE CLASSIFICATION NO. 15 \n \nOPTIONAL DEMAND SERVICE RATE (CONT’D) \n \nRATES: (cont’d) \n \n3. \nAs-Used Demand Charge: (Cont’d) \n \n \nReserved for Future Use"},{"page":346,"startToken":78303,"endToken":78685,"text":"PSC No: 120 - Electricity\nLeaf No. 328\nNew York State Electric & Gas Corporation\nRevision: 1\nInitial Effective Date: January 1, 2025\nSuperseding Revision: 0\nIssued in compliance with Order in Case No. 24-E-0493, dated December 19, 2024.\nISSUED BY: Jeremy Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 15\nOPTIONAL DEMAND SERVICE RATE\nMERCHANT FUNCTION CHARGE ( MFC ):\nAll kW hours, per kWh\nPer MFC Statement, as described in Section 25.I.D.\nSYSTEM BENEFITS CHARGE:\nEach customer bill for service under this Service Classification shall be increased by multiplying all kWh delivered\nby the applicable System Benefits Charge rate shown in the System Benefits Charge Statement.\n-\nThe EV Surcharge shall be applied per kWh delivered under this Service Classification, (as explained in this\nSchedule General Information Rule 49). The rate shall be set forth on the EVMR Statement\nOASC (sub-classification) as provided in this Service Classification shall determine the applicable\nRevenue Decoupling Adjustment (as explained in this Schedule, General Information Section 7). See RDM\nStatement.\nThe RAM shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as explained\nin in this Schedule General Information Rule 38). See RAM Statement.\nRECOVERY CHARGE\nThe Recovery Charge shall be applied per On-Peak As-Used Demand delivered under this Service Classification,\n(as explained in this Schedule General Information Rule 57). The rate shall be set forth on the Recovery Charge\nStatement.\nMINIMUM CHARGE:\nThe minimum charge per month for service under this Service Classification is the Contract Demand Charge if\napplicable, plus the Customer Charge and Bill Issuance Charge, if applicable, as listed above.\nINCREASE IN RATES AND CHARGES:\nThe rates and charges under this Service Classification, including any adjustments and minimum charge, are\nincreased by the applicable effective percentage shown in Rule 6 of this Schedule for service supplied within the\nmunicipality where the Customer is taking service.\nTERMS OF PAYMENT:\nBills rendered under this Service Classification are payable on receipt. A late payment charge of 1½% per month\nshall be billed on all amounts not paid by the \"past due\" date. For additional information,\n119\nElectricity, Section 4.\nTERM:\nIf a customer opts-in to this Service Classification, the customer shall remain on this Service Classification for a\nminimum of one year and thereafter until terminated by 60 days written notice."},{"page":347,"startToken":78685,"endToken":78817,"text":"PSC No: 120 - Electricity\nLeaf No. 328.1\nNew York State Electric & Gas Corporation\nRevision: 0\nInitial Effective Date: January 1, 2025\nSuperseding Revision:\nIssued in compliance with Order in Case No. 24-E-0493, dated December 19, 2024.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 15\nOPTIONAL DEMAND SERVICE RATE\nEARNINGS ADJUSTMENT MECHANISM ( EAM) :\nThe EAM shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as explained\nin this Schedule General Information Rule 4.K). The rate shall be set forth on the EAM Statement.\nNON-WIRES ALTERNATIVE ( NWA ) SURCHARGE:\nThe NWA Surcharge shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as\nexplained in this Schedule General Information Rule 47. The rate shall be set forth on the NWA Statement."},{"page":348,"startToken":78817,"endToken":79193,"text":"PSC No: 120 - Electricity\nLeaf No. 329\nNew York State Electric & Gas Corporation\nRevision: 0\nInitial Effective Date: January 1, 2024\nSuperseding Revision:\nIssued in compliance with Order in Case 15-E-0751, dated October 13, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Binghamton, New York\nSERVICE CLASSIFICATION NO. 15\nOPTIONAL DEMAND SERVICE RATE\nDETERMINATION OF DEMAND:\n1.\nContract Demand:\nThe Company shall establish the Contract Demand for a customer that opts for the rates under this\nService Classification. For mass-market customers, the Company shall use the metered demand for the\ndemand increases, the Contract Demand will increase. The Contract Demand will only be decreased if\nFor a demand-billed customer, the Company shall\nlast 12-month period for the first bill. Thereafter, similar to the mass-market customers, if the metered\ndemand increases, the Contract Demand will increase. The demand will only be decreased if the\n2.\nAs-Used Demand:\na)\nThe as-used demand for mass market customers (a customer whose otherwise applicable service\nclassification is non-demand billed) with interval metering will be sum of the highest daily 60- minute\nintegrated demand (measured in kW) measured on the clock-hour occurring during the On-Peak hours as\n. If in any billing period, there is a failure in the\nmetered usage data acquisition that results in the failure to record daily as-used demand data, the Company\nreserves the right to estimate reasonable values for the missing data for recording and billing purposes.\nb)\nFor all other customers with interval metering, the as-used demand shall be the aggregate of the highest\ndaily 15- minute integrated demand (measured in kW) occurring during the On-Peak hours as defined in\nlling period, there is a failure in the metered\nusage data acquisition that results in the failure to record daily as-used demand data, the Company reserves\nthe right to estimate reasonable values for the missing data for recording and billing purposes.\nMETERING AND COMMUNICATION REQUIREMENTS:\na)\nA customer shall be required to have an Advanced Metering Infrastructure (AMI) meter as described in\nPSC No. 119 - Rule 3.A.III to be eligible for this service classification.\nb)\nA customer that elects to opt-out of receiving an AMI meter pursuant to PSC No. 119 - Rule 3.A.III, is\nineligible to take service under this service classification."},{"page":349,"startToken":79193,"endToken":79198,"text":"Orange & Rockland  \nService Classification 9"},{"page":350,"startToken":79198,"endToken":79198,"text":""},{"page":351,"startToken":79198,"endToken":79198,"text":""},{"page":352,"startToken":79198,"endToken":79198,"text":""},{"page":353,"startToken":79198,"endToken":79198,"text":""},{"page":354,"startToken":79198,"endToken":79198,"text":""},{"page":355,"startToken":79198,"endToken":79198,"text":""},{"page":356,"startToken":79198,"endToken":79198,"text":""},{"page":357,"startToken":79198,"endToken":79203,"text":"Orange & Rockland  \nService Classification 22"},{"page":358,"startToken":79203,"endToken":79203,"text":""},{"page":359,"startToken":79203,"endToken":79203,"text":""},{"page":360,"startToken":79203,"endToken":79203,"text":""},{"page":361,"startToken":79203,"endToken":79203,"text":""},{"page":362,"startToken":79203,"endToken":79203,"text":""},{"page":363,"startToken":79203,"endToken":79203,"text":""},{"page":364,"startToken":79203,"endToken":79203,"text":""},{"page":365,"startToken":79203,"endToken":79203,"text":""},{"page":366,"startToken":79203,"endToken":79203,"text":""},{"page":367,"startToken":79203,"endToken":79217,"text":"Rochester Gas and Electric Corporation \nService Classification 8: Large General Service with \nTime-of-Use Metering"},{"page":368,"startToken":79217,"endToken":79676,"text":"PSC No:  19 - Electricity \n \n \nLeaf No. 194 \nRochester Gas and Electric Corporation \n \n \nRevision:  25 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  23 \nIssued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026. \n \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York \n \n \nSERVICE CLASSIFICATION NO. 8 \n \n \nLARGE GENERAL SERVICE - TIME-OF-USE RATE \n \nAPPLICABLE TO USE OF SERVICE FOR: \nAll purposes, in Entire Territory, by any customer with a basic demand of not less than 300 kW during any three of \nthe previous 12 months, provided, however, that whenever the monthly basic demand has been 200 kW or less for 12 \nconsecutive months, the customer thereafter shall be billed under another appropriate service classification. \n \nCHARACTER OF SERVICE: \nContinuous, Alternating Current - 60 cycle; voltage and phase at the Company's option, as available and appropriate \nfor the customer's requirements. \n \nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS: \nCustomers served under this Service Classification may select from two different Supply Service Options as \ndescribed below.  The Company shall offer a Retail Access rate choice and a Non-Retail Access rate choice. \n \nThe Retail Access choice (see below) is the ESCO Supply Service (ESS).  The Non-Retail choice is the RG&E \nSupply Service (RSS).  RG&E shall provide Delivery Service regardless of the customer’s supply service \noption. \n \n1. ESCO Supply Service (ESS)   \nThis Retail Access choice includes fixed components for the Company delivery service, a Transition \nCharge as described in Section 12.B., and a Bill Issuance Charge.  Customers that elect ESS and receive \na Consolidated Bill shall not be subject to the Bill Issuance Charge.  An Energy Service Services \nCompany (“ESCO”) provides Electric Power Supply to the customer.  The Company provides the \ndelivery service only.  Customers that elect ESS shall not be subject to the Merchant Function Charge \n(MFC). \n \n2.   RG&E Supply Service (RSS)  \n \nThis Non-Retail Access choice includes fixed components for the Company delivery service, a \nTransition Charge  as described in Section 12.B., a Bill Issuance Charge, and a commodity charge that \nfluctuates with the market price of electricity and consists of energy, capacity, capacity reserves, losses, \nunaccounted for energy, ancillary services, NYPA Transmission Access Charge (NTAC), transmission \nproject costs allocated to the Company under the NYISO tariff s approved by FERC, and Supply \nAdjustment Charge.  Electricity supply is provided by the Company. \n \nElectricity Supply Charge: \n \nThe charge for Electric Power Supply provided by the Company shall fluctuate with the market price of \nelectricity and shall include the following components: Energy, Energy Losses, Unaccounted for \nEnergy, Capacity, Capacity Reserves, Capacity Losses, ancillary services, NTAC, transmission project \ncosts allocated to the Company under the NYISO tariff as approved by FERC, and Supply Adjustment \nCharge. \n \nMerchant Function Charge: \nAll kWh, per kWh \nPer MFC Statement, as described in Rule 12"},{"page":369,"startToken":79676,"endToken":79729,"text":"PSC No: 19 - Electricity\nLeaf No. 194.1\nRochester Gas and Electric Corporation\nRevision: 5\nInitial Effective Date: January 1, 2010\nSuperseding Revision: 4\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nSERVICE CLASSIFICATION NO. 8\nLARGE GENERAL SERVICE - TIME-OF-USE RATE (Cont d)\nReserved for Future Use"},{"page":370,"startToken":79729,"endToken":79796,"text":"PSC No: 19 - Electricity\nLeaf No. 194.1.1\nRochester Gas and Electric Corporation\nRevision: 5\nInitial Effective Date: January 1, 2010\nSuperseding Revision: 4\nIssued in Compliance with Order in Case 09-E-0228 issued and effective September 28, 2009\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nSERVICE CLASSIFICATION NO. 8\nLARGE GENERAL SERVICE - TIME-OF-USE RATE (Cont’d)\nReserved for Future Use"},{"page":371,"startToken":79796,"endToken":79938,"text":"PSC No:  19 - Electricity \n \n \nLeaf No. 194.2 \nRochester Gas and Electric Corporation \n \n \nRevision:  23 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  21 \nIssued in Compliance with Order in Case No. 25-E-0379, dated May 14, 2026. \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York \n \n \nSERVICE CLASSIFICATION NO. 8 \n \n \nLARGE GENERAL SERVICE - TIME-OF-USE RATE (Cont’d) \n \n \nRATE Applicable to both ESS and RSS: (Per Meter, Per Month) \n \n \nDelivery Charges: \nThe Delivery Charges for Customer Charge and Delivery Demand Charge are specified in the Delivery \nCharges section of this Service Classification.   \n \nSystem Benefits Charge: \n \n \n \n \n \n \n \nAll kWh, per kWh \n \n \n \n \nPer SBC Statement \n \n \nBill Issuance Charge (per bill): \n \n \n$0.99, as described in Rule 11.F. \n \n  \nNon-Bypassable Charge (“NBC”): \n All kWh, per kWh   \n \nPer TCS Statement. \n \nRate Adjustment Mechanism (“RAM”): \nAll kW, per kW \n \nPer RAM Statement, as described in Rule 24"},{"page":372,"startToken":79938,"endToken":80110,"text":"PSC No: 19 - Electricity\nLeaf No. 194.2.1\nRochester Gas and Electric Corporation\nRevision: 9\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 8\nIssued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 8\nLARGE GENERAL SERVICE - TIME-OF-\n3. Hourly Pricing\nMandatory and Voluntary\nMandatory\nA customer taking service under Hourly Pricing shall remain subject to this provision until their monthly\nmeasured demand has been less than 200 KW for 12 consecutive months, at which time the customer shall be\nbilled under another appropriate service classification.\nVoluntary:\nHourly Pricing is voluntary for any customer who would otherwise qualify for service under Service\nClassification No. 8\nLarge General Service\nTime of Use Rate. Once a customer elects Hourly Pricing they\nshall remain subject to this provision until their monthly measured demand has been 200 KW or less for 12\nconsecutive months, the customer shall then be billed under another appropriate service classification."},{"page":373,"startToken":80110,"endToken":80261,"text":"PSC No: 19 - Electricity\nLeaf No. 194.3\nRochester Gas and Electric Corporation\nRevision: 10\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 9\nIssued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 8\nLARGE GENERAL SERVICE - TIME-OF-\n3. Hourly Pricing\nMandatory and Voluntary\nAdditionally, Hourly Pricing is voluntary\ndevelopment programs without supply option restrictions beginning on or prior to-December 31, 2006, and would\nhave otherwise qualified for Mandatory Hourly Pricing u\nincentive expires. Upon the conclusion of their participation in the economic development program the customer\nshall be subject to Mandatory Hourly Pricing and have two supply options, ESS or Hourly Pricing option, as\ndescribed below.\nDELIVERY CHARGES:\nThe delivery charges set forth in this Service classification for standard service shall apply to a customer taking\nservice under Hourly Pricing."},{"page":374,"startToken":80261,"endToken":80568,"text":"PSC No: 19 - Electricity\nLeaf No. 194.4\nRochester Gas and Electric Corporation\nRevision: 11\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 9\nIssued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 8\nLARGE GENERAL SERVICE - TIME-OF-\n3. Hourly Pricing\nMandatory and Voluntary\nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS:\nCustomers served under this Service Classification may select from the different electricity Supply Service\nOptions offered by the Company as described below. The Company shall offer a Retail Access rate choice and a\nNon-Retail Access rate choice.\nThe Retail Access choice (see 1. below) is the ESCO Supply Service (ESS). The Non-Retail choice is the (see 2.\nbelow) Company Hourly Day-Ahead Market Pricing Option (\nThe Company shall provide only delivery service for the Retail Access choice. Electricity supply is provided by\nan Energy Se\nany time.\nThe Company shall provide delivery service and commodity service for the Non-Retail Access choice.\nA customer who has not chosen an option, and for whom the Company has not received a retail access enrollment\nfrom an ESCO, shall default to the Company Hourly Day-Ahead Market Pricing Option.\n1. ESCO Supply Service (ESS)\nThis Retail Access choice includes fixed components for the Company delivery service, a Transition Charge\nas described in Section 12.B., and a Bill Issuance Charge. Customers that elect ESS and receive a\nConsolidated Bill shall not be subject to the Bill Issuance Charge.\n2. Hourly Day-Ahead Market\nThis Non-Retail Access choice includes fixed charges for the Company delivery service, a Transition Charge, as\ndescribed in Section 12.B., a commodity charge for electricity supply that fluctuates hourly with the market price of\nelectricity including losses as described in Section 12.C. Electricity supply is provided by the Company."},{"page":375,"startToken":80568,"endToken":80643,"text":"PSC No: 19 - Electricity\nLeaf No. 194.5\nRochester Gas and Electric Corporation\nRevision: 4\nInitial Effective Date: May 1, 2017\nSuperseding Revision: 3\nIssued in compliance with Orders in Case 15-E-0302, dated February 22, 2017 and 17-M-0106 dated April 20, 2017.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 8\nLARGE GENERAL SERVICE - TIME-OF-USE RATE (Cont’d)\nHourly Pricing – Mandatory and Voluntary (Cont’d)\nReserved for Future use"},{"page":376,"startToken":80643,"endToken":80908,"text":"PSC No: 19 - Electricity\nLeaf No. 194.6\nRochester Gas and Electric Corporation\nRevision: 3\nInitial Effective Date: May 1, 2017\nSuperseding Revision: 2\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 8\nLARGE GENERAL SERVICE - TIME-OF-\n3. Hourly Pricing\nMandatory and Voluntary\nMETERING AND COMMUNICATION REQUIREMENTS:\n1. Customer Responsibilities:\nAll customers subject to this special provision are required to have interval metering and remote meter reading\ncapability. Such customers shall be responsible for the following:\na) the costs of providing remote meter reading capability through dedicated telecommunications to and\nfrom the meter; and\nb) the dedicated telecommunications shall be approved by the Company, and\nc) all costs associated with the installation, operation and maintenance of the telecommunications equipment,\nincluding but not limited to, all telecommunications service bills. If the Company is unable to read the meter\nthrough a customer provided connection, and the Company has determined that the problem is not caused by\nthe Company's equipment, the customer shall be responsible for resolution of the problem. The customer shall\nalso be responsible for reimbursement of the Company expenses incurred for visits to the meter location to\nascertain the cause of the problem, including reimbursing the Company for any expenses the Company incurs,\nsuch as, but not limited to, the cost to provide a manual meter read.\n2.Company Responsibilities:\na) Equipment shall\nshall be based upon available resources and\nCompany Schedule.\nb) In the absence of equipment failure, if the customer requests replacement of working equipment, it shall be\nscheduled by order of request and availability."},{"page":377,"startToken":80908,"endToken":81044,"text":"PSC No:  19 - Electricity \n \n \nLeaf No. 195 \nRochester Gas and Electric Corporation \n \n \nRevision: 18 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  16 \nIssued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026. \nISSUED BY:  Lindsey N. Overton Orietas, Vice President – Regulatory, Rochester, New York \n  \nSERVICE CLASSIFICATION NO. 8 (Cont’d) \n \nLARGE GENERAL SERVICE - TIME-OF-USE RATE \n \nDELIVERY CHARGES: \nThe following charges are applicable to a customer taking service under this Service Classification.  \n \n \n \nEffective Date \n06/01/2026 \nCustomer Charge: (per month) \nSecondary \nPrimary \nSubtransmission-Industrial \nSubtransmission-Commercial \nTransmission \nSubstation \n \n$1,725.00 \n$2,175.00 \n$4,300.00 \n$4,050.00 \n$6,400.00 \n$3,875.00 \nDemand Charge:  All kW, per kW of billing demand \nSecondary \nPrimary \nSubtransmission – Industrial \nSubtransmission – Commercial \nTransmission \nSubstation \n$21.48 \n$21.28 \n$14.42 \n$15.12 \n$14.45 \n$12.59"},{"page":378,"startToken":81044,"endToken":81115,"text":"PSC No: 19 - Electricity\nLeaf No. 195.1\nRochester Gas and Electric Corporation\nRevision: 13\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 11\nIssued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 8\nLARGE GENERAL SERVICE - TIME-OF-USE RATE\nREACTIVE CHARGE:\nReactive kilovolt-ampere hours, per billing reactive kilovolt-ampere hour:\n$0.00127"},{"page":379,"startToken":81115,"endToken":81417,"text":"PSC No: 19 - Electricity\nLeaf No. 195.2\nRochester Gas and Electric Corporation\nRevision: 22\nInitial Effective Date: January 1, 2025\nSuperseding Revision: 21\nIssued in compliance with Order in Case No. 24-E-0493, dated December 19, 2024.\nISSUED BY: Jeremy Euto, Vice President\nRegulatory, Rochester, New York\nSERVICE CLASSIFICATION NO. 8\nLARGE GENERAL SERVICE - TIME-OF-USE RATE\nAll customers taking service under this Service Classification shall be subject to a RDM adjustment as explained in this\nSchedule, General Information Section 4.K. Customers taking Transmission service are excluded from the RDM. See\nRDM Statement.\nThe Merchant Function Charge reflects the administrative costs of obtaining electricity supply. All customers taking\nsupply service under this Service Classification with the Company shall be subject to a MFC charge (as explained in this\nSchedule, General Information Section 12.). See MFC Statement.\nThe RAM shall be applied per kW to all kW delivered under this Service Classification, (as explained in this Schedule,\nGeneral Information Rule 24). See RAM Statement.\nEARNINGS ADJUSTMENT MECHANISM ( EAM ):\nThe EAM shall be applied per kW delivered under this Service Classification, (as explained in this Schedule General\nInformation Rule 4.K). The rate shall be set forth on the EAM Statement.\nNON-WIRES ALTERNATIVE ( NWA ) SURCHARGE:\nThe NWA Surcharge shall be applied per kW delivered under this Service Classification, (as explained in this Schedule\nGeneral Information Rule 32). The rate shall be set forth on the NWA Statement.\n-\nThe EV Surcharge shall be applied per kW delivered under this Service Classification, (as explained in this Schedule\nGeneral Information Rule 33). The rate shall be set forth on the EVMR Statement.\nRECOVERY CHARGE:\nThe Recovery Charge shall be applied per kW delivered under this Service Classification, (as explained in this\nSchedule General Information Rule 41). The rate shall be set forth on the Recovery Charge Statement."},{"page":380,"startToken":81417,"endToken":81565,"text":"PSC No:  19 - Electricity \n \n \nLeaf No. 195.3 \nRochester Gas and Electric Corporation \n \n \nRevision: 2  \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision: 0    \nIssued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026. \n \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York \nSERVICE CLASSIFICATION NO. 8 (Cont’d) \nLARGE GENERAL SERVICE - TIME-OF-USE RATE \n \n \nINCREASE IN RATES AND CHARGES: \nThe rates and charges under this Service Classification, including any system benefits charge, adjustments and minimum \ncharge, are increased by the applicable effective aggregate percentage shown in Rule 4.J for service supplied within the \nmunicipality where the customer is taking service. \n \nMINIMUM DELIVERY DEMAND CHARGE:   \nThe minimum monthly delivery demand charge is as follows per kW of service capacity contracted for: \n \nSecondary \n$6.94 \nPrimary \n$7.58 \nSubstation \n$5.01 \nSub Transmission Industrial \n$4.16 \nSub Transmission Commercial \n$4.37 \nTransmission \n$4.82"},{"page":381,"startToken":81565,"endToken":81967,"text":"PSC No: 19 - Electricity\nLeaf No. 196\nRochester Gas and Electric Corporation\nRevision: 6\nInitial Effective Date: September 26, 2010\nSuperseding Revision: 5\nIssued in compliance with Order in Case 09-E-0717 dated September 21, 2010\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nSERVICE CLASSIFICATION NO. 8 (Cont’d)\nLARGE GENERAL SERVICE - TIME-OF-USE RATE\nMINIMUM DELIVERY DEMAND CHARGE (Cont’d):\nWhenever the monthly maximum demand registered and seasonally adjusted exceeds the service capacity contracted for, the\ncustomer's service capacity shall be automatically increased to such seasonally adjusted demand and the service capacity\nthus established may not be reduced during the next eleven months.\nThe seasonally adjusted demand shall be determined by multiplying the monthly maximum demand registered by a factor of\n1.00 for the Summer Season, a factor of .75 for the Winter Season and a factor .85 for the Base Season.\nDETERMINATION OF DEMAND:\n1.\nBasic Demand\nThe demand applicable to the minimum charge and power factor adjustment computation, will be the measured\nmaximum 30-minute integrated demand occurring anytime during the monthly period for which bill is rendered.\n2.\nPeak Hours Demand\nThe demand applied to the demand charge computation, will be the measured maximum 30-minute integrated demand\noccurring during the peak hours in the month for which bill is rendered.\nDETERMINATION OF REACTIVE KILOVOLT-AMPERE HOURS:\nEffective 09/22/2010, the determination of the billing reactive kilovolt-ampere hours will be the reactive kilovolt-ampere\nhours in excess of one-fourth of the metered kilowatt-hours.\nDEFINITION OF HOURLY PERIODS:\nPeak Hours Demand: Peak hours are defined as the hours between 7:00 am and 11:00 pm, Monday through Friday. All\nother hours are defined as \"off-peak\" hours.\nPeak Hours Energy: Peak hours are defined as the hours between 7:00 am and 11:00 pm, Monday through Friday.\nOff-Peak Hours Energy: All remaining hours.\nDEFINITION OF SEASONS:\nSummer:\nJune 1-September 30, inclusive.\nWinter:\nDecember l-February 28/29, inclusive.\nBase:\nAll other days.\nHIGH VOLTAGE OPTION\nWhere service at a higher than secondary voltage is available, and where the customer elects to be served thereby, and the\ncustomer will at his own expense provide, install and maintain the necessary transformers and protective devices of a size\nand type approved by the Company, the primary or transmission rate charges will apply.\nPrimary charges will apply to customers taking service at 4,160, 11,500, 12,470, or 34,500 volts."},{"page":382,"startToken":81967,"endToken":82450,"text":"PSC No: 19 - Electricity\nLeaf No. 197\nRochester Gas and Electric Corporation\nRevision: 10\nInitial Effective Date: July 16, 2018\nSuperseding Revision: 9\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 8 (Cont'd)\nLARGE GENERAL SERVICE- TIME-OF-USE RATE\nHIGH VOLTAGE OPTION (Cont'd)\nEffective September 26, 2010, Subtransmission Service shall be grandfathered. The grandfathering shall apply to the\nservice location including the site and existing buildings where customers taking Subtransmission Service before\nSeptember 26, 2010. Grandfathering is applicable to any new owner acquiring possession of a grandfathered service\nlocation, as long as they meet the qualification criteria for Subtransmission Service. The grandfathering may apply\nto facility replacements and or expansions by customers taking grandfathered Subtransmission Service, if\naccomplished through existing subtransmission metering points at the service location. Subtransmission service\nshall not be available to new service locations.\nSubtransmission charges shall apply to:\n1.\nCustomers taking service at 34,500 volts, provided, however, such customers were taking service\nhereunder prior to September 26, 2010, or\n2.\nCustomers taking service at 11,500 volts, provided, however, such customers were taking service\nhereunder prior to August 1, 1988.\nTransmission charges shall apply to customers taking service at 115,000 volts.\nSubstation charges shall apply to:\n1.\nCustomers taking service from a dedicated substation at primary or secondary voltages but whose\nincoming supply voltage is at 34,500 volts or above and who are metered with respect to the incoming\nsupply voltage provided, or\n2.\nCustomers taking Substation service (formally known as Sub Transmission\nSecondary service) prior to\nSeptember 26, 2010.\nTERMS OF PAYMENT:\nAll bills are rendered at the above rate. A late payment charge of 1½% per month shall become due and\npayable if payment is not made on or before the \"last day to pay\" date specified on the bill in accordance with\nthe provisions of Rule 4.C.(2).\nTERM:\nOne year and thereafter until terminated by 30 days' notice. However, when the amount of investment required or\nother conditions of service are such as to warrant, the Company, with the permission of the Public Service\nCommission, may agree with the customer to render service at rates from time to time effective for a longer term.\nSPECIAL PROVISIONS:\n1.\nPower Factor Adjustment\nApplicable to customers not subject to a reactive charge, whenever the customer's equipment is so\noperated that the maximum kilovolt- amperes of lagging reactive demand exceed 48% of the maximum\nkW demand during the billing month, the customer shall remedy that condition in a manner deemed\nadequate by Company, by either:\na.\nInstalling and maintaining at its own expense the power factor corrective equipment deemed\nnecessary by Company to remedy the condition, or\nb.\nMaking a cash contribution of the actual reasonable cost of any power factor corrective equipment\ninstalled by Company on its side of the point of delivery to effect such correction."},{"page":383,"startToken":82450,"endToken":82641,"text":"PSC No: 19 - Electricity\nLeaf No. 198\nRochester Gas and Electric Corporation\nRevision: 3\nInitial Effective Date: May 1, 2017\nSuperseding Revision: 2\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 8 (Cont'd)\nLARGE GENERAL SERVICE - TIME-OF-USE RATE\nSPECIAL PROVISIONS: (Cont'd)\n2.\nSubmetering Service\nElectric service under this service classification is available to any customer who qualifies for a\nsubmetering option as provided for under Rule 2.E.(2).\n3.\nException to Applicability\nService under this service classification shall be available to those customers with a measured demand of\nless than 300 kW who were taking service under this service classification as of May 18, 1984.\n4.\nCustomers who qualify for the Recharge NY Power Program pursuant to Section L.5 of the General\nInformation Section of this Schedule, shall have such power billed in accordance with the provision\ntherein. The customer's power requirements in excess of the RNY Power allocation will be billed in\naccordance with the ESCO Supply Service rate or the RG&E Supply Service rate of this Service\nClassification applicable to the customer's voltage level.\n(Continued on next leaf)"},{"page":384,"startToken":82641,"endToken":82714,"text":"PSC No: 19 - Electricity\nLeaf No. 199\nRochester Gas and Electric Corporation\nRevision: 13\nInitial Effective Date: July 1, 2016\nSuperseding Revision: 12\nIssued in compliance with Order in Case 15-E-0285, dated June 15, 2016\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nSERVICE CLASSIFICATION NO. 8 (Cont'd)\nLARGE GENERAL SERVICE TIME -OF-USE RATE (Cont'd)\nSPECIAL PROVISIONS: (Cont’d)\n5. Economic Development Programs\nA. Reserved for Future Use"},{"page":385,"startToken":82714,"endToken":82789,"text":"PSC No: 19 - Electricity\nLeaf No. 199.1\nRochester Gas and Electric Corporation\nRevision: 14\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 12\nIssued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020.\n6\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 8 (Cont'd)\nLARGE GENERAL SERVICE TIME -OF-USE RATE (Cont'd)\nSPECIAL PROVISIONS: (Cont d)\n5. Economic Development Programs\nReserved for Future Use"},{"page":386,"startToken":82789,"endToken":83030,"text":"PSC No: 19 - Electricity\nLeaf No. 199.2\nRochester Gas and Electric Corporation\nRevision: 13\nInitial Effective Date: November 1, 2023\nSuperseding Revision: 11\nIssued in compliance with Order in Case No. 22-E-0319, dated October 12, 2023.6\nISSUED BY: Jeremy Euto, Vice President\nRegulatory, Rochester, New York\n\\\nSERVICE CLASSIFICATION NO. 8 (Cont'd)\nLARGE GENERAL SERVICE TIME -OF-USE RATE (Cont'd)\nSPECIAL PROVISIONS: (Cont d)\n5. Economic Development Programs\nB) Reserved for Future Use\nC) Excelsior Jobs Program (EJP)\nService taken under this Service Classification may be eligible for the rates and charges under the Excelsior Jobs\nProgram. Any customer who meets the qualifications set forth under General Information Section 4.L.3 shall pay\nfor service at the following rate:\nRATE: (per month)\nFor customers qualifying for the EJP, the Non-Bypassable Charge [ NBC ] component of the Transition Charge and the\nRevenue Decoupling Mechanism (RDM) Adjustment do not apply to the following S.C. No. 8 voltage levels: Secondary,\nPrimary, Sub Transmission-Industrial, and Sub Transmission-Commercial. For certain adjustments approved by the\nCommission, a separate credit shall\nAll customers shall be required to pay\nCommodity, Capacity, Merchant Function, and Bill Issuance Charges, if applicable, in accordance with the standard RSS\nor ESS rates for this Service Classification. All customers are also required to pay the System Benefits Charges, Rate\nAdjustment Mechanism, Non-Wires Alternative Surcharge, Earnings Adjustment Mechanism, and Reactive Charges in\naccordance with the standard RSS or ESS rates for this Service Classification."},{"page":387,"startToken":83030,"endToken":83372,"text":"PSC No: 19 - Electricity\nLeaf No. 199.3\nRochester Gas and Electric Corporation\nRevision: 13\nInitial Effective Date: November 1, 2023\nSuperseding Revision: 11\nIssued in compliance with Order in Case No. 22-E-0319, dated October 12, 2023.\nISSUED BY: Jeremy Euto, Vice President\nRegulatory, Rochester, New York\nSERVICE CLASSIFICATION NO. 8 (Cont'd)\nLARGE GENERAL SERVICE TIME -OF-USE RATE (Cont'd)\nSPECIAL PROVISIONS: (Cont d)\n5. Economic Development Programs\nC) Excelsior Jobs Program (EJP)\nEffective Date\n11/01/2023\n05/01/2024\n05/01/2025\nCustomer Charge: (per month)\nSecondary\nPrimary\nSub Transmission-Industrial\nSub Transmission-Commercial\nTransmission\n$1,350.00\n$1,700.00\n$3,250.00\n$3,100.00\n$4,925.00\n$1,525.00\n$1,925.00\n$3,750.00\n$3,525.00\n$5,600.00\n$1,725.00\n$2,175.00\n$4,300.00\n$4,050.00\n$6,400.00\nMake-Whole Customer Charge: (per month)\nSecondary\nPrimary\nSub Transmission-Industrial\nSub Transmission-Commercial\nTransmission\n$26.12\n$33.69\n$85.53\n$79.20\n$114.55\n$26.12\n$33.69\n$85.53\n$79.20\n$114.55\n$26.12\n$33.69\n$85.53\n$79.20\n$114.55\nDemand Charge: All kW, per kW of billing demand\nSecondary\nPrimary\nSub Transmission-Industrial\nSub Transmission-Commercial\nTransmission\n$0.00\n$0.97\n$0.58\n$0.74\n$10.91\n$0.00\n$0.67\n$0.37\n$0.37\n$11.43\n$0.00\n$0.35\n$0.13\n$0.00\n$11.53\nEffective May 1, 2026, the Make-\nbill shall not include the Make-Whole Rate.\nFor a customer qualifying for the EJP program and taking Substation service, such customer shall be subject to the\notherwise applicable standard service classification rates, including the Transition Charge, Commodity, Merchant\nFunction, and Bill Issuance Charges, if applicable, in accordance with the standard RSS or ESS rates for this\nService Classification. All customers are also required to pay the System Benefits Charges, Rate Adjustment\nMechanism, and Reactive Charges in accordance with the standard RSS or ESS rates for this Service\nClassification. Qualifying load shall be exempt from the Non-Bypassable Charge [ NBC ] component of the\nTransition Charge and the Revenue Decoupling Mechanism (RDM)."},{"page":388,"startToken":83372,"endToken":83548,"text":"PSC No: 19 - Electricity\nLeaf No. 199.4\nRochester Gas and Electric Corporation\nRevision: 6\nInitial Effective Date: November 1, 2023\nSuperseding Revision: 5\nIssued in compliance with Order in Case No. 22-E-0319, dated October 12, 2023.\nISSUED BY: Jeremy Euto, Vice President\nRegulatory, Rochester, New York\nSERVICE CLASSIFICATION NO. 8 (Cont'd)\nLARGE GENERAL SERVICE TIME -OF-USE RATE (Cont'd)\nSPECIAL PROVISIONS: (Cont d)\n5. Economic Development Programs\nC) Excelsior Jobs Program (EJP)\nEffective Date\n11/01/2023\n05/01/2024\n05/01/2025\nCustomer Charge: (per month)\nSubstation\n$2,975.00\n$3,400.00\n$3,875.00\nMake-Whole Customer Charge\n$68.12\n$68.12\n$68.12\nDemand Charge:\nAll kW, per kW of billing demand\nSubstation\n$9.59\n$10.87\n$12.34\nMake-Whole Demand Charge:\nAll kW, per kW of billing demand\nSubstation\n$0.23\n$0.23\n$0.23\nEffective May 1, 2026, the Make-\nshall not include the Make-Whole Rate.\nEJP customers shall be offered two supply service options and charged in accordance with their choice:\n1.\nESCO Supply Service\n2.\nRG&E Supply Service"},{"page":389,"startToken":83548,"endToken":83698,"text":"PSC No:  19 - Electricity \n \n \nLeaf No. 200 \nRochester Gas and Electric Corporation \n \n \nRevision:  22 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision: 20 \nIssued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026. \n6 \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York \n \nSERVICE CLASSIFICATION NO. 8 (Cont'd) \n \n \nLARGE GENERAL  SERVICE - TIME -OF-USE RATE (Cont'd) \n \nSPECIAL PROVISIONS: (Cont’d) \n  \n6. Optional Election of Service Classification No. 14 Rates: \nA demand-metered customer that does not have On-Site Generating facilities (“OSG”) may opt to select the applicable \nrates under Service Classification No. 14 and be billed under such rates for a period of not less than 12 months, in lieu of \nthe rates applicable under this Service Classification.  \n \nA customer that opts for these rates shall comply with the “Optional Election of Service Rate for Customers Without On-\nsite Generation” as described in Service Classification No. 14."},{"page":390,"startToken":83698,"endToken":83764,"text":"PSC No: 19 - Electricity\nLeaf No. 200.1\nRochester Gas and Electric Corporation\nRevision: 6\nInitial Effective Date: July 1, 2016\nSuperseding Revision: 4\nIssued in compliance with Order in Case 15-E-0285, dated June 15, 2016\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nSERVICE CLASSIFICATION NO. 8 (Cont'd)\nLARGE GENERAL SERVICE - TIME -OF-USE RATE (Cont'd)\nReserved for future use"},{"page":391,"startToken":83764,"endToken":83836,"text":"PSC No: 19 - Electricity\nLeaf No. 200.2\nRochester Gas and Electric Corporation\nRevision: 7\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 5\nIssued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 8 (Cont'd)\nLARGE GENERAL SERVICE - TIME -OF-USE RATE (Cont'd)\n7.\nReserved for Future Use\n8.\nReserved for Future Use"},{"page":392,"startToken":83836,"endToken":83906,"text":"PSC No: 19 - Electricity\nLeaf No. 201\nRochester Gas and Electric Corporation\nRevision: 4\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 2\nIssued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 8 (Cont'd)\nLARGE GENERAL SERVICE - TIME -OF-USE RATE (Cont'd)\nSPECIAL PROVISIONS: (Cont d)\n8.\nReserved for Future Use"},{"page":393,"startToken":83906,"endToken":84293,"text":"PSC No: 19 - Electricity\nLeaf No. 202\nRochester Gas and Electric Corporation\nRevision: 0\nInitial Effective Date: June 1, 2003\nSuperseding Revision:\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nSERVICE CLASSIFICATION NO. 8 (Cont'd)\nLARGE GENERAL SERVICE - TIME -OF-USE RATE (Cont'd)\nSPECIAL PROVISIONS: (Contd.)\n9.\nNYISO Incentivized Day-Ahead Economic Load Curtailment Program Rider\nAny Customer that is taking service under this service classification and is participating in the NYISO's\nIncentivized Day-Ahead Economic Load Curtailment Program is eligible for service under this rider.\na)\nTerm\nThe Demand Reduction Incentive Payments offered under this rider will expire on October 31, 2003.\nb)\nDemand Reduction Provider\nCustomers taking service under this rider are responsible for enrolling with a NYISO approved Demand\nReduction Provider (\"DRP\"). A DRP is an entity qualified pursuant to NYISO procedures that bids\nDemand Side Resources of at least 1 MW. The DRP shall aggregate the loads received from Demand\nSide Resources. The DRP shall, if necessary, pro-rate the demand reduction bids in order to submit bids\nin the whole MWs required by the NYISO.\nRG&E will function as a DRP. Customers taking service under this rider will sign an agreement with\nRG&E.\nc)\nDemand Side Resources\nDemand Side Resources (\"DSR\") are customers that are capable of reducing demand in a responsive,\nmeasurable and verifiable manner within time limits, are qualified to participate in the program, and have\nsigned an agreement with RG&E.\nd)\nRegistration Procedures\nThe DSR will enter into a signed agreement with RG&E specifying the terms under which the DSR will\nparticipate in the program. This agreement will include information needed by the NYISO for program\nadministration. The data required will include at least the organization name, an administrative contact,\n7x24 operations contacts, the LBMP zone and/or sub-zone, and billing meter number. RG&E will\nprovide the DSR with the appropriate zonal designation.\ne)\nMetering and Meter Data Provision\nDSRs taking service under the Demand Reduction Program will be required to have an interval-billing\nmeter. If the DSR does not already have an interval meter, it must acquire one per general information\nsection 3.E of this tariff. Customers will bear the cost of such metering equipment only to the extent that\nit is not covered by NYSERDA.\n(Continued on next leaf)"},{"page":394,"startToken":84293,"endToken":84746,"text":"PSC No: 19 - Electricity\nLeaf No. 203\nRochester Gas and Electric Corporation\nRevision: 0\nInitial Effective Date: June 1, 2003\nSuperseding Revision:\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nSERVICE CLASSIFICATION NO. 8 (Cont'd)\nLARGE GENERAL SERVICE - TIME -OF-USE RATE (Cont'd)\nSPECIAL PROVISIONS: (Contd.)\n9.\nNYISO Incentivized Day-Ahead Economic Load Curtailment Program Rider (continued)\nf)\nBidding by the DSR\n1.)\nThe DSR will submit its demand reduction bids to the DRP in accordance with the agreement.\n2.)\nBids must be submitted to the DRP by 11:00 a.m. two days ahead of the curtailment day, (e.g. by\n11:00 a.m. on Monday for Wednesday). However, bids for Saturday and Sunday must be submitted\nby 11:00 a.m. on Thursday, and bids for Monday and Tuesday must be submitted by 11:00 a.m. on\nFriday.\n3.)\nBids must be submitted in blocks in accordance with the agreement between the DSR and the DRP.\n4.)\nBids must be submitted in dollar and/or cents increments per KW for the desired block(s) of time in\naccordance with the agreement between the DSR and the DRP.\n5.)\nThe DSR could include a curtailment initiation cost as an integral part of their bid.\n6.)\nThe DSR will submit bids that the DRP will aggregate into whole MW increments.\ni)\nDSRs must bid in 0.10 MW (100 KW) increments.\nii)\nThe 0.10 MW (100KW) units will be inclusive of the appropriate loss factor.\niii)\nThe 0.10 MW (100KW) units may include the curtailment initiation factor.\n7.)\nA bid can not be recalled or changed once it has been accepted by the DPR.\ng)\nBidding by the DRP\nThe DRP must submit its demand reduction bid to the NYISO in whole MW units. The DRP will\naggregate the DSR bids, at each price level bid by the DSRs, into whole MW units. In the event that the\ntotal aggregated demand reduction bid by the DSRs does not total to a whole MW unit, the individual\nDSR demand reduction bids will be pro-rated downward so that the total DRP bid will total to the next\nlowest whole MW (e.g. DSR bids that totaled 2.3 MW would be pro-rated so that the total DRP bid was\n2.0 MW). The DRP will aggregate bids from all of the service classifications at each price level. The\nDRP will be notified of the acceptance of the bid by the NYISO one day ahead. The DRP will notify the\nDSR upon receipt of notification of the acceptance of a bid by the NYISO on the day prior to the day of\nthe curtailment.\n(Continued on next leaf)"},{"page":395,"startToken":84746,"endToken":85186,"text":"PSC No: 19 - Electricity\nLeaf No. 204\nRochester Gas and Electric Corporation\nRevision: 1\nInitial Effective Date: October 2, 2006\nSuperseding Revision: 0\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nSERVICE CLASSIFICATION NO. 8 (Cont'd)\nLARGE GENERAL SERVICE - TIME -OF-USE RATE (Cont'd)\nSPECIAL PROVISIONS: (Contd.)\n9.\nNYISO Incentivized Day-Ahead Economic Load Curtailment Program Rider (continued)\nh)\nDSR Customer Baseline Load and Actual Consumption\nThe DSR Customer Baseline Load (\"CBL\") is an average hourly energy consumption that is used to\ndetermine the level of curtailment for each individual DSR. The CBL will be calculated according to the\nNYISO Day-Ahead Response Program Manual that is posted on the NYISO's web-site.\nThe DRP shall submit demand reduction bids to the NYISO. All DSRs whose bids are included, in\nwhole or in part, in the DRP's demand reduction bid that is scheduled and accepted by the NYISO, are\nexpected to reduce their real-time energy consumption by the amount of the bid accepted by the DRP.\nThe amount of actual real-time curtailment determined for a DSR will be equal to its CBL less its actual\nreal-time consumption during the specified curtailment.\ni)\nPayment by DSR\nDSRs taking service under this rider will pay the rates and charges that would otherwise be applicable\nunder this service classification and will be subject to all other terms and conditions of this service\nclassification. Failure to pay any charges associated with service under this service classification,\nincluding any penalties charged per section (k) of this rider, will result in the rescinding the DSR's right\nto participate in this program.\nj)\nPayment to DSR\nThe DRP will be paid by the NYISO in accordance with the NYISO Day-Ahead Demand Response\nProgram Manual. The DSR will receive a rebate equal to 90% of the rate paid to the DRP by the NYISO\nfor the amount of its demand reduction bid that was accepted by the DRP.\nk)\nNon-Performance Penalties\nFor DSRs who fail to comply with a scheduled NYISO curtailment, non-conformance penalties, as\ndescribed in the NYISO Day-Ahead Demand Response Program Manual, will apply. These penalties\nwill initially be charged to the DRP by the NYISO, and will be passed along, in their entirety to the non-\ncomplying DSRs.\n10.\nCustomer Owned Meters\nAs described in Rule 3.E.(2) and Rule 4.A.(2), Customers taking service under this service classification have\nthe option of owning a Commission-approved meter. Such meters remain under the control of the Company.\nEach month, a Customer that owns a Commission-approved meter will not be charged the monthly Meter\nOwnership charge applicable to the customer s voltage level."},{"page":396,"startToken":85186,"endToken":85343,"text":"PSC No: 19 - Electricity\nLeaf No. 204.1\nRochester Gas and Electric Corporation\nRevision: 6\nInitial Effective Date: November 1, 2023\nSuperseding Revision: 5\nIssued in compliance with Order in Case No. 22-E-0319, dated October 12, 2023.\nISSUED BY: Jeremy Euto, Vice President\nRegulatory, Rochester, New York\nSERVICE CLASSIFICATION NO. 8 (Cont'd)\nLARGE GENERAL SERVICE - TIME -OF-USE RATE (Cont'd)\nSPECIAL PROVISIONS:\n11.\nFarm Waste Electric Generating System Option\nThis option is for a customer qualifying for the Farm Waste Electric Generating System Option pursuant\nto General Information Section 13 of this Schedule and taking service under S.C. No. 8. If electricity\n(kWh) supplied by the customer to the Company is not metered for the time-differentiated periods, an\nallocation to each TOU period shall be done according to allocation factors as described herein. 40% of\nthe excess electricity (kWh) supplied by the customer shall be considered On-Peak. 60% of the excess\nelectricity (kWh) shall be considered Off-Peak."},{"page":397,"startToken":85343,"endToken":85801,"text":"PSC No: 19 - Electricity\nLeaf No. 204.2\nRochester Gas and Electric Corporation\nRevision: 7\nInitial Effective Date: November 1, 2023\nSuperseding Revision: 6\nIssued in compliance with Order in Case No. 22-E-0319, dated October 12, 2023.\nISSUED BY: Jeremy Euto, Vice President\nRegulatory, Rochester, New York\nSERVICE CLASSIFICATION NO. 8\nLARGE GENERAL SERVICE\nTIME-OF-USE RATE\n12. Wind Electric Service Option\nThis option is for a customer qualifying for the Wind Electric Service Option pursuant to General Information\nSection 13 of this Schedule and taking service under S.C. No. 8 - TOU. If electricity (kWh) supplied by the\ncustomer to the Corporation is not metered for the time-differentiated periods, an allocation to each TOU period\nshall be done according to allocation factors as described herein. 40% of the excess electricity (kWh) supplied\nby the customer shall be considered On-Peak. 60% of the excess electricity (kWh) shall be considered Off-\nPeak.\n13. Electric Hybrid Generating System Option\nThis Option is for a customer qualifying for the Electric Hybrid Generating System Option pursuant to General\nInformation Section 13 of this Schedule and taking service under S.C. No. 8.\n14. Solar Non-Residential Electric Generating System Option\nThis option is for a customer qualifying for the Solar Non-Residential Electric Generating System Option\npursuant to General information Section 13 of this Schedule and taking service under S.C. No. 8. If electricity\n(kWh) supplied by the customer to the Corporation is not metered for the time-differentiated periods, an\nallocation to each TOU period shall be done according to allocation factors as described herein. 40% of the\nexcess electricity (kWh) supplied by the customer shall be considered On-Peak. 60% of the excess electricity\n(kWh) shall be considered Off-Peak.\n15. Fuel Cell Electric Service Option\nThis option is for a customer qualifying for the Fuel Cell Service Option pursuant to General Information\nSection 13 of this Schedule and taking service under S.C. No. 8.\n16. Micro-Hydroelectric Service Option\nThis Option is for a customer qualifying for the Micro-Hydroelectric Service Option pursuant to General\nInformation Section 13 of this Schedule and taking service under S.C. No. 8.\n17. Community Distributed Generation Service Option\nThis Option is for a customer qualifying for the Community Distributed Generation Service Option pursuant to\nGeneral Information Section 13 of this Schedule and taking service under S.C. No. 8.\n18.\nServe New Governmental Entities\nParticipants in the NYPA Program shall be subject to the otherwise applicable standard service classification\nrates, including the Transition Charge (Non-Bypassable Charge), Bill Issuance Charges, if applicable, in\naccordance with the standard ESS rates for this Service Classification. All customers are also required to pay\nthe System Benefits Charges, and Rate Adjustment Mechanism in accordance with the standard ESS rates for\nthis Service Classification."},{"page":398,"startToken":85801,"endToken":85892,"text":"PSC No: 19 - Electricity\nLeaf No. 204.3\nRochester Gas and Electric Corporation\nRevision: 3\nInitial Effective Date: October 17, 2025\nSuperseding Revision: 2\nIssued in compliance with Order in Case No. 22-E-0236, dated October 17, 2024.\nISSUED BY: Patricia Nilsen, Chief Executive Officer, Rochester, New York\nSERVICE CLASSIFICATION NO. 8\nLARGE GENERAL SERVICE - TIME-OF-USE RATE\n19. Electric Vehicle Phase-In Rate\nAn eligible customer may elect to participate in the Electric Vehicle Phase-In Rate pursuant to General\nInformation Section 19 of this Schedule subject to the provisions and eligibility requirements therein."},{"page":399,"startToken":85892,"endToken":85958,"text":"PSC No: 19 - Electricity\nLeaf No. 204.4\nRochester Gas and Electric Corporation\nRevision: 7\nInitial Effective Date:\nAugust 1, 2011\nSuperseding Revision: 5\nIssued in compliance with Order in Case 09-E-0717 issued and effective May 20, 2011\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nSERVICE CLASSIFICATION NO. 8\nLARGE GENERAL SERVICE - TIME-OF-USE RATE (Cont’d)\nReserved For Future Use"},{"page":400,"startToken":85958,"endToken":86024,"text":"PSC No: 19 - Electricity\nLeaf No. 204.5\nRochester Gas and Electric Corporation\nRevision: 4\nInitial Effective Date: August 1, 2011\nSuperseding Revision: 2\nIssued in compliance with Order in Case 09-E-0717 issued and effective May 20, 2011\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nSERVICE CLASSIFICATION NO. 8\nLARGE GENERAL SERVICE - TIME-OF-USE RATE (Cont’d)\nReserved For Future Use"},{"page":401,"startToken":86024,"endToken":86090,"text":"PSC No: 19 - Electricity\nLeaf No. 204.6\nRochester Gas and Electric Corporation\nRevision: 2\nInitial Effective Date: August 1, 2011\nSuperseding Revision: 1\nIssued in compliance with Order in Case 09-E-0717 issued and effective May 20, 2011\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nSERVICE CLASSIFICATION NO. 8\nLARGE GENERAL SERVICE - TIME-OF-USE RATE (Cont’d)\nReserved For Future Use"},{"page":402,"startToken":86090,"endToken":86156,"text":"PSC No: 19 - Electricity\nLeaf No. 204.7\nRochester Gas and Electric Corporation\nRevision: 2\nInitial Effective Date: August 1, 2011\nSuperseding Revision: 1\nIssued in compliance with Order in Case 09-E-0717 issued and effective May 20, 2011\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nSERVICE CLASSIFICATION NO. 8\nLARGE GENERAL SERVICE - TIME-OF-USE RATE (Cont’d)\nReserved For Future Use"},{"page":403,"startToken":86156,"endToken":86197,"text":"PSC No: 19 - Electricity\nLeaf No. 205\nRochester Gas and Electric Corporation\nRevision: 7\nInitial Effective Date: January 1, 2007\nSuperseding Revision: 6\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nReserved for Future Use"},{"page":404,"startToken":86197,"endToken":86239,"text":"PSC No: 19 - Electricity\nLeaf No. 205.1\nRochester Gas and Electric Corporation\nRevision: 1\nInitial Effective Date: January 1, 2007\nSuperseding Revision: 0\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nReserved for Future Use"},{"page":405,"startToken":86239,"endToken":86280,"text":"PSC No: 19 - Electricity\nLeaf No. 206\nRochester Gas and Electric Corporation\nRevision: 6\nInitial Effective Date: January 1, 2007\nSuperseding Revision: 5\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nReserved for Future Use"},{"page":406,"startToken":86280,"endToken":86321,"text":"PSC No: 19 - Electricity\nLeaf No. 207\nRochester Gas and Electric Corporation\nRevision: 4\nInitial Effective Date: January 1, 2007\nSuperseding Revision: 3\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nReserved for Future Use"},{"page":407,"startToken":86321,"endToken":86362,"text":"PSC No: 19 - Electricity\nLeaf No. 208\nRochester Gas and Electric Corporation\nRevision: 1\nInitial Effective Date: January 1, 2007\nSuperseding Revision: 0\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nReserved for Future Use"},{"page":408,"startToken":86362,"endToken":86403,"text":"PSC No: 19 - Electricity\nLeaf No. 209\nRochester Gas and Electric Corporation\nRevision: 2\nInitial Effective Date: January 1, 2007\nSuperseding Revision: 1\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nReserved for Future Use"},{"page":409,"startToken":86403,"endToken":86418,"text":"Rochester Gas and Electric Corporation \nService Classification 14: Standby Service  \nOtherwise Applicable Service Class 8"},{"page":410,"startToken":86418,"endToken":86793,"text":"PSC No: 19 - Electricity\nLeaf No. 237\nRochester Gas and Electric Corporation\nRevision: 5\nInitial Effective Date: January 1, 2024\nSuperseding Revision: 4\nIssued in compliance with Order in Case 15-E-0751, dated October 13, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE\nAPPLICABLE TO USE OF SERVICE FOR:\n1.\nDelivery of Standby Service for any customer where all or a portion of a customer's electricity is supplied from\nOn-\non facility that does not provide electricity supply to\n(defined as the distribution and/or transmission system, regardless of voltage or functional classification). An\nnative load, to sell in the wholesale market or to carry out a combination thereof. Such OSG may be connected\nwith the Company\n-\nthrow switch (or similar device). For customers with multiple electrical services, this tariff applies to each of\nnot electrically isolated from the OSG. All separately metered\nelectricity supply and/or delivery service not otherwise served by the OSG (e.g., separate delivery service to the\nshall be provided under the\nClassification, Service Classification Nos. 1, 2, 3, 7, and 8 qualify as OASCs). This service classification shall\napply to a customer that installs stand-alone storage, or storage paired with non-renewable OSG, with a\nmaximum inverter capability greater than 1 MW.\n2.\nBefore a customer is allowed to install and operate an OSG, the customer must submit design and operating\ninformation for the proposed OSG in accordance with the appropriate application and review process described\n-01 Requir\n-\nA customer operating OSG with a total nameplate rating equal to, or expected to be equal to, 15% or less of its\nmaximum potential demand served by all sources, as that maximum potential demand is reasonably determined\nby the Company, shall take service under the OASC unless the customer opts to take service under this\nclassification. RG&E may disqualify a customer from Standby Service if the Company can demonstrate that\nthe customer (a) has installed OSG with a total nameplate rating greater than 15% of its load, but (b) has not\nA customer who declines service under this tariff is required to electrically isolate its facility from the\nCo\nshall not be required to maintain electric delivery service to that\nshall\nw."},{"page":411,"startToken":86793,"endToken":87220,"text":"PSC No: 19 - Electricity\nLeaf No. 238\nRochester Gas and Electric Corporation\nRevision: 0\nInitial Effective Date: February 1, 2004\nSuperseding Revision:\nIn compliance with order in Case 02-E-0551, Establishing Electric Standby Rates, Issued and Effective July 29, 2003\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nElectrically Isolated Loads:\nIf a customer elects to electrically isolate and serve its load with OSG without connection to the Company's system,\nthe isolated portion of that customer's load will not be subject to Standby Service -- provided that the customer\nexecutes a letter agreement with the Company that provides for the following:\na)\nthe Company will be entitled to inspect the electrical configuration of the OSG facilities upon a\ncustomer's request for this exemption;\nb)\nif, at any time, the Company has a reasonable concern that the customer’s OSG facilities have not\nremained isolated from the Company's system, the Company is authorized to inspect the electrical\nconfiguration of such facilities, and the customer must cooperate with that inspection; and\nc)\nif the Company discovers, through billing data and/or the inspection of the customer's OSG facilities,\nthat any of the electrically isolated OSG facilities have been reconnected to RG&E’s system, the\nCompany will backbill the customer. A Contract Demand will be established by the Company and the\nbackbill will consist of RG&E’s Standby Service rates, applied back to the time of OSG\ninterconnection to RG&E’s system, and include the surcharge as set forth below in the Unauthorized\nOSG Interconnection by Customer section, with Late Payment Charges as applicable, set forth in the\nTerms of Payment section of this Service Classification.\nA facility shall be considered “electrically isolated” if: (a) the electrical points of contact where interconnection with\nthe Company could occur are separated and at least 100 feet from any other interconnected electrical service utilized\nby such customer, or (b) the isolated service is not within the same building or structure as any other interconnected\nelectrical service of the customer and not housed within a common enclosure with other interconnected breakers\nand/or fuses of the customer. At its discretion, the Company may consider a separation of less than 100 feet\nbetween a customer’s facilities and the Company’s system to be electrically isolated if there are site-specific\nconfiguration circumstances warranting such a determination.\nCompliance:\nA customer taking Standby Service shall comply with all federal, state and local laws, regulations, and\nrequirements, including the requirements listed below in the Interconnection Requirements\nparagraphs 1 through 7."},{"page":412,"startToken":87220,"endToken":87725,"text":"PSC No: 19 - Electricity\nLeaf No. 239\nRochester Gas and Electric Corporation\nRevision: 10\nInitial Effective Date: January 1, 2024\nSuperseding Revision: 9\nIssued in compliance with Order in Case 15-E-0751, dated October 13, 2023.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nSTANDBY SERVICE IS NOT APPLICABLE TO:\n1a. Net Metered Solar Generating System Option\nStandby service will not apply to a customer operating solar generating equipment and taking service under\nGeneral Information Section 13.\n1b. Farm Waste Electric Generating System Option\nStandby service will not apply to a customer taking service under the Farm Waste Electric Generating System\nOption, provided such customer meets criteria for service under General Information Section 13 of this\nSchedule.\n1c. Net Metered Wind Generating System Option\nStandby service will not apply to a customer operating wind generating equipment and taking service under\nGeneral Information Section 13.\n1d. Net Metered Hybrid Generating System Option\nStandby service will not apply to a customer operating hybrid generating equipment and taking service under\nGeneral Information Section 13.\n2. Emergency Generators\nStandby Service rates shall not apply to customers whose only generating units are emergency generators. For the\npurpose of this Service Classification, a generating unit must meet each of the following two criteria to be\nconsidered an emergency generator:\na)\nThe emergency generator is used exclusively for purposes of supplying electrical power to the\nCustomer when electrical power is not available from the Company.\nb)\nNo load is served by the emergency generator while electric service is available from the Company to\nthe premises, except for regularly scheduled tests when the generator is required to operate under load\nProgram or the Emergency Demand Response Program.\nExcluding residential customers, the customer must submit a one-line diagram and specification sheet on the switch\nfor the OSG for the Company\nwith the Company stating that the emergency generator shall not operate in parallel with th\nThe customer shall maintain an operating log for each emergency generator indicating the date, time, hours, and\npurpose of each operation of each such facility. This log shall be made available to the Company upon request.\nFailure to do so shall permit the Company to (a) bill the customer under this Service Classification for the amount of\nStandby Service which the Company can reasonably estimate was delivered to and/or available to the customer\nduring times when the Company did not charge the customer for such service due to this emergency generator\nexemption; and (b) establish a Contract Demand for one year, and thereafter as applicable.\nStandby Service rates shall not apply to that p\nery service associated with the delivery of\nelectricity supply pursuant to applicable NYPA programs.\n4. Stand-Alone Energy Storage Systems\nA customer with a stand-alone energy storage system enrolled with NYISO to charge for wholesale purposes will be\nbilled pursuant to the Wholesale Distribution Service ( WDS ), at such time that the WDS tariff becomes effective,\nand shall not be subject to Standby Service rates."},{"page":413,"startToken":87725,"endToken":88329,"text":"PSC No: 19 - Electricity\nLeaf No. 240\nRochester Gas and Electric Corporation\nRevision: 12\nInitial Effective Date: June 1, 2023\nSuperseding Revision: 11\nIssued in compliance with Order in Case No. 19-E-0079, dated May 18, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nOPTIONAL STANDBY SERVICE RATE IS APPLICABLE TO:\n1. Existing Customers\nand wholesale generators (defined as companies whose primary business is the production of electricity for sale into the\nwholesale electricity market)) or who:\na) had commenced construction of an OSG facility;\nb) had been named by the New York State Energy Research and Development Authority (\"NYSERDA\") as an\nOSG project grant recipient as listed in the Commission Order Establishing Electric Standby Rates, issued and\neffective July 30, 2003, Attachment A, paragraph 4;\nc) had been named by NYSERDA as an OSG feasibility study grant recipient, as listed in the Commission Order\nEstablishing Electric Standby Rates, issued and effective July 30, 2003, Attachment A, paragraph 4; or\nd) had received a binding, written financial commitment from a lending institution for the construction and\ninstallation of an OSG.\nTo remain qualified as an Existing Customer, the customer must commence operation of its OSG by May 31, 2021.\n2. A Designated Technology Customer is defined as:\na)\nA customer operating OSG that exclusively uses one or more of the following technologies and/or fuels for\nproducing electricity: solar thermal; photovoltaics ( PV ); on land and offshore wind; hydroelectric;\ngeothermal electric; geothermal ground source heat; tidal energy; wave energy; ocean thermal;, or\nb)\nUses small, efficient types of combined heat and powe\nnot exceed 15 MW of\ncapacity and is operational prior to May 31, 2021, and conforms with the following criteria:\ni.\nii. Annual overall efficiency should not be less than 60% based on the higher heating value (HHV) of the\nfuel input;\niii. The usa\nusable annual energy output;\niv. The size limits shall be determined by aggregating the nameplate ratings of the generation units,\ninstalled at its location, excluding emergency generation units used only during a utility distribution\nsystem failure or in response to the NYISO Emergency Demand Response Program:\nv. An eligible CHP facility shall demonstrate to the utility that its generation installation meets an\nenvironmental standard of no more than 4.4 lbs./MWh of Noxemissions, based on its electrical and\nmechanical output or its rated capacity, or as updated by the Department of Environmental\nConservation (DEC);\nvi. Customers shall comply with the above criteria and;\n1. Monitor and record efficiency data,\n2. Have records available for utility inspection,\n3. Retain the records for a 3-year period.\n4. An additional meter will be required for CHP generating facilities greater than 1 MW. The\ncustomer shall be required to install, at their expense, revenue grade, interval meters to measure\ngeneration output and additional telemetry equipment capable of transmitting operational\ninformation to the Company; or\nc)\nA customer operating electric energy storage with a maximum inverter capability of up to and including 1\nMW; or\nd)\nA customer operating fuel cell units which utilize biofuels or hydrogen, provided that the manufacture or\nproduction of such fuels does not include the combustion or electrolysis of fossil fuels, or the use of fossil\nfuels or non-renewable grid power in the conversion process.\ni. Biomass, Biogas and Fuel cells which utilize fossil fuel resources installed prior to June 1, 2023 shall\nremain exempt in accordance with the customer s election. Biomass, Biogas and Fuel cells which\nutilize fossil fuel resources installed on or after June 1, 2023 are not eligible for the Designated\nTechnologies Exemption."},{"page":414,"startToken":88329,"endToken":88434,"text":"PSC No: 19 - Electricity\nLeaf No. 240.1\nRochester Gas and Electric Corporation\nRevision: 0\nInitial Effective Date: January 19, 2024\nSuperseding Revision:\nIssued in Compliance with Order in Case No. 22-E-0236, dated November 20, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nOPTIONAL STANDBY SERVICE RATE IS APPLICABLE TO\n:\n2. A Designated Technology Customer is defined as\n:\ne) A customer operating electric energy storage in conjunction with electric vehicle charging station(s) with inverter\ncapability greater than 1 MW and less than or equal to the sum of nameplate electric vehicle charging capability."},{"page":415,"startToken":88434,"endToken":88633,"text":"PSC No: 19 - Electricity\nLeaf No. 241\nRochester Gas and Electric Corporation\nRevision: 11\nInitial Effective Date: January 1, 2024\nSuperseding Revision: 10\nIssued in compliance with order in Case No. 15-E-0751, issued and effective October 13, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\n3. Designated Technology Exemption of Standby Rates\na)\nCustomers whose facilities are placed in service after July 29, 2003, and meet the definitions of both\nExisting Customers and Designated Technology Customers, shall be considered to be Designated\nTechnology Customers for purposes of this section.\nb)\nDesignated Technology Customers whose facilities are placed in service after July 29, 2003, have the\noption to make a one-time election to be permanently exempt from standby service rates rather than\nelecting full standby service rates upon providing 30 days written notice before commencing operation of\nthe OSG facility.\nc)\nExisting OSG projects that upgrade by installing designated technology components, or hybrid projects\ncomprised in part of designated technology components, are eligible for the designated technology\nexemption only for the upgrade components and only if those components are separately metered.\nCHARACTER OF SERVICE:\nContinuous, Alternating Current - 60 cy"},{"page":416,"startToken":88633,"endToken":88993,"text":"PSC No:  19 - Electricity \n \n \nLeaf No. 242 \nRochester Gas and Electric Corporation \n \n \nRevision:  22 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  20 \nIssued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026. \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York \n \nSERVICE CLASSIFICATION NO. 14 \n \nSTANDBY SERVICE (Cont'd) \nRATES: \nAn existing customer that taking service pursuant to this Service Classification as of January 1, 2024, shall be \nphased-in to the Redesigned Rates over a five-year period as described below for each year. \n \nA customer may make a one-time election to take service at the Redesigned Rates in lieu of the phase-in.  Such \nelection shall be provided by the customer to the Company in writing.  Once a customer has elected to take service \nat the Redesigned Rates, the customer may not return to the phase-in. \n \nAn existing customer that elects the phase-in shall be billed on the percentage basis shown below using the Prior \nRates and the Redesigned Rates for each year:  \n \n \nPrior Rates \nRedesigned Rates \nYear 1 \n83.3% \n16.7% \nYear 2 \n66.6% \n33.4% \nYear 3 \n49.9% \n50.1% \nYear 4 \n33.2% \n66.8% \nYear 5 \n16.5% \n83.5% \n \nAt the conclusion of Year 5, a customer shall be subject to the Redesigned Rates.  \n \nDelivery Charges:  \nThe rate components of the delivery portion of this service: Customer Charge, Bill Issuance Charge, Contract \nDemand Charge, Reactive Charge, and As-Used Demand Charge.   \n 1.    \nPer customer, per month. \nCustomer Charge \n \nEffective: 6/1/2026 \nCustomer's OASC: \nPrior Rates \nRedesigned Rates \nS.C. No. 1 \n$23.00 \n$23.00 \nS.C. No. 2 \n$23.00 \n$23.00 \nS.C. No. 3 \n$401.00 \n$401.00 \nS.C. No. 7 \n$162.00 \n$162.00 \nS.C. No. 8 - Secondary \n$1,725.00 \n$1,725.00 \nS.C. No. 8 - Substation  \n$3,875.00 \n$3,875.00 \nS.C. No. 8 - Primary \n$2,175.00 \n$2,175.00 \nS.C. No. 8 - Sub Transmission-Industrial \n$4,300.00 \n$4,300.00 \nS.C. No. 8 - Sub Transmission-Commercial \n$4,050.00 \n$4,050.00 \nS.C. No. 8 - Transmission \n$6,400.00 \n$6,400.00"},{"page":417,"startToken":88993,"endToken":89056,"text":"PSC No:  19 - Electricity \n \n \nLeaf No. 242.0 \nRochester Gas and Electric Corporation \n \n \nRevision:  2 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  0   \nIssued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026. \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 14 \n \nSTANDBY SERVICE (Cont'd) \nRATES: \n1. (Cont’d) \nReserved for Future Use"},{"page":418,"startToken":89056,"endToken":89120,"text":"PSC No:  19 - Electricity \n \n \nLeaf No. 242.1 \nRochester Gas and Electric Corporation \n \n \nRevision:  10 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  8 \nIssued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026. \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York \n \n \nSERVICE CLASSIFICATION NO. 14 \n \n \nSTANDBY SERVICE (Cont'd) \nRATES: \n Delivery Charges: (Cont’d): \n  \nReserved for Future Use"},{"page":419,"startToken":89120,"endToken":89318,"text":"PSC No:  19 - Electricity \n \n \nLeaf No. 242.2 \nRochester Gas and Electric Corporation \n \n \nRevision:  10 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  8 \nIssued in Compliance with Order in Case No. 25-E-0379, dated May 14, 2026. \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York \n \n \nSERVICE CLASSIFICATION NO. 14 \n \nSTANDBY SERVICE (Cont'd) \nRATES: \n Delivery Charges: (Cont’d): \n2.  Contract Demand Charge: \n \nThe Contract Demand Charge is determined by multiplying the Customer’s Contract Demand times the \nContract Demand rate.   \n \n \nContract Demand \nPrior Rates \nRedesigned Rates \nCustomer's OASC: \nEffective: June 1, 2026 \nContract Demand \nCharge,  \nper kW of Contract \nDemand* \nContract Demand \nCharge,  \nper kW of Contract \nDemand \nSC No. 1* \n $25.00  \n $6.22  \nSC No. 2* \n $23.93  \n $6.47  \nSC No. 3 \n $10.21  \n $4.32  \nSC No. 7  \n $12.47  \n $3.18  \nSC No. 8 - Secondary \n$8.84 \n$1.08 \nSC No. 8 - Substation  \n$6.21 \n$0.00 \nSC No. 8 - Primary \n$7.42 \n$3.73 \nSC No. 8 - Sub Transmission-Industrial \n$2.02 \n$1.17 \nSC No. 8 - Sub Transmission-Commercial \n$2.00 \n$1.91 \nSC No. 8 - Transmission \n$9.43 \n$2.41 \n* Contract Demand Charge for Prior Rates is per customer, per month"},{"page":420,"startToken":89318,"endToken":89382,"text":"PSC No:  19 - Electricity \n \n \nLeaf No. 242.3 \nRochester Gas and Electric Corporation \n \n \nRevision:  2 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  0   \nIssued in compliance with Order in Case No.25-E-0379, dated May 14, 2026. \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York \n \n \nSERVICE CLASSIFICATION NO. 14 \n \nSTANDBY SERVICE (Cont'd) \nRATES: \n Delivery Charges: (Cont’d): \n \nReserved for Future Use"},{"page":421,"startToken":89382,"endToken":89445,"text":"PSC No: 19 - Electricity\nLeaf No. 243\nRochester Gas and Electric Corporation\nRevision: 18\nInitial Effective Date: August 12, 2016\nSuperseding Revision: 17\nIssued in compliance with Order in Case 15-E-0285 dated June 15, 2016.\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nDelivery Charges: (Cont’d):\nReserved for Future Use"},{"page":422,"startToken":89445,"endToken":89656,"text":"PSC No:  19 - Electricity \n \n \nLeaf No. 243.1 \nRochester Gas and Electric Corporation \n \n \nRevision:  17 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  15 \nIssued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026. \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York \n \n \n \n \nSERVICE CLASSIFICATION NO. 14 \n \nSTANDBY SERVICE (Cont'd) \nDelivery Charges: (Cont’d): \n \n3.   As-Used Demand Charge:  \n \n \n  \nDaily As-Used Demand Charge for customers with interval metering, on-peak kW, per kW of daily metered demand. \n \n  \nPrior Rates \n \nOASC \nSC No. 3 \nSC No. 7 \nSC No. 8 \n \n$0.54045 \n$0.17684 \n \nSecondary \n \n \n$0.58368 \nSubstation \n \n \n$0.28982 \nPrimary \n \n \n$0.61041 \nSub Trans- Industrial \n \n \n$0.67693 \nSub Trans – Commercial \n \n \n$0.72874 \nTransmission \n \n \n$0.14209 \n \n \n \nRedesigned Rates \nDaily As-Used Demand Charge, per kW of daily metered demand, during On-Peak and Super-Peak hours, as \napplicable. \n \nOn-Peak: \n \nOASC \nSC No. 3 \nSC No. 7 \nSC No. 8 \n \n$0.64635 \n$0.67920 \n \nSecondary \n \n \n$0.66614 \nSubstation \n \n \n$0.44363 \nPrimary \n \n \n$0.55341 \nSub Trans- \nIndustrial \n \n \n$0.48723 \nSub Trans – \nCommercial \n \n \n$0.59360 \nTransmission \n \n \n$0.35968 \n \nSuper-Peak: \nOASC \nSC No. 3 \nSC No. 7 \nSC No. 8 \n \n$1.29269 \n$1.35841 \n \nSecondary \n \n \n$1.33228 \nSubstation \n \n \n$0.88727 \nPrimary \n \n \n$1.10682 \nSub Trans- \nIndustrial \n \n \n$0.97446 \nSub Trans – \nCommercial \n \n \n$1.18720 \nTransmission \n \n \n$0.71935"},{"page":423,"startToken":89656,"endToken":89717,"text":"PSC No:  19 - Electricity \n \n \nLeaf No. 243.1.1 \nRochester Gas and Electric Corporation \n \n \nRevision:  2 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision: 0   \nIssued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026. \n \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York \nSERVICE CLASSIFICATION NO. 14 \n \nSTANDBY SERVICE (Cont'd) \n \nReserved for Future Use"},{"page":424,"startToken":89717,"endToken":90027,"text":"PSC No:  19 - Electricity \n \n \nLeaf No. 243.2 \nRochester Gas and Electric Corporation \n \n \nRevision:  9 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  7 \nIssued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026. \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York \n \nSERVICE CLASSIFICATION NO. 14 \n \nSTANDBY SERVICE (Cont'd) \n \nDaily As-Used Demand Charge for customers without demand metering. \n \n \nPrior Rates: \n \nDelivery \n \nEffective Date \n \nJune 1, 2026 \nOASC: \nSC No. 1 \nSC No. 2 \n \n$0.04533 \n$0.03800 \n \n \nRedesigned Rates: \nDaily As-Used Demand Charge, per kW of daily metered demand, during On-Peak and Super-Peak hours, as \napplicable. \n \nDelivery \n \nEffective Date \n \nJune 1, 2026 \nOASC: \nSC No. 1 \nSC No. 2 \nOn-Peak \n$0.17219 \n$0.21087 \nSuper-Peak \n$0.34438 \n$0.42174 \n \n4.  Non-Bypassable Charge (“NBC”):  \n All kWh, per kWh   \n \nPer TCS Statement. \n \nRate Periods: \nPrior Rates \nExisting Customers that were taking service as of October 13, 2023: \nOn-Peak hours are defined for kW, kWh, and Daily As-Used Demand as the hours between 7:00 a.m. and 11:00 \np.m., Monday through Friday.  All remaining hours are defined as “Off-Peak” hours. \n \nRedesigned Rates \nOn-Peak hours are defined for kW and kWh as the hours between 7:00 a.m. and 11:00 p.m., Monday through \nFriday.  All remaining hours are defined as “Off-Peak” hours. \n \nFor As-Used Demand: \nSummer Super-Peak hours \n2:00 pm - 5:59 pm on \nNon-Holiday Weekdays \nSummer months are June, July, \nAugust, and September \nSummer On-Peak hours \n7:00 am - 1:59 pm and \n6:00 pm – 10:59 pm on \nNon-Holiday Weekdays \nNon-Summer months are October, \nNovember, \nDecember, January, February, March, \nApril, and May \nNon-Summer On-Peak hours \n7:00 am – 10:59 pm on \nNon-Holiday Weekdays \n \nOff-Peak hours \nAll other hours \nincluding Holidays* \n \n \n* Holidays are New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas \nDay"},{"page":425,"startToken":90027,"endToken":90186,"text":"PSC No: 19 - Electricity\nLeaf No. 243.3\nRochester Gas and Electric Corporation\nRevision: 0\nInitial Effective Date: January 1, 2024\nSuperseding Revision:\nIssued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023.\nISSUED BY: Jeremy Euto, Vice President\nRegulatory, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nREACTIVE CHARGE:\nReactive kilovolt-ampere hours, per billing reactive kilovolt-ampere hour:\n$0.00127\nMERCHANT FUNCTION CHARGE (MFC):\nAll kW hours, per kWh\nPer MFC Statement, as described in Rule 12\nSYSTEM BENEFITS CHARGE:\nEach customer bill for service under this Service Classification shall be increased by multiplying all kWh delivered\nby the applicable System Benefits Charge rate shown in the System Benefits Charge Statement as mandated by\nPublic Service Commission Order issued January 26, 2001.\n-\nThe EV Surcharge shall be applied per kWh delivered under this Service Classification, (as explained in this\nSchedule General Information Rule 33). The rate shall be set forth on the EVMR Statement."},{"page":426,"startToken":90186,"endToken":90649,"text":"PSC No: 19 - Electricity\nLeaf No. 244\nRochester Gas and Electric Corporation\nRevision: 17\nInitial Effective Date: January 1, 2025\nSuperseding Revision: 16\nIssued in compliance with Order in Case No. 24-E-0493, dated December 19, 2024.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nMINIMUM CHARGE:\nThe minimum charge per month for service under this Service Classification is the Contract Demand Charge if applicable,\nplus the Customer Charge and Bill Issuance Charge, if applicable, as listed above.\nA customer taking service under this Service Classification shall be subject to a Revenue Decoupling Mechanism adjustment\n(as explained in this Schedule, General Information Section 4.K.). See RDM Statement.\nA customer billed at OASC as provided in this Service Classification shall be subject to a Revenue Decoupling Adjustment\n(as explained in this Schedule, General Information Section 7).\nSee RDM Statement.\nThe RDM Adjustment for the\nshall apply.\nThe RAM shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as explained in in\nthis Schedule General Information Rule 24). See RAM Statement.\nEARNINGS ADJUSTMENT MECHANISM (EAM):\nThe EAM shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as explained\nin this Schedule General Information Rule 4.K). The rate shall be set forth on the EAM Statement.\nNON-WIRES ALTERNATIVE (NWA) SURCHARGE:\nThe NWA Surcharge shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as\nexplained in this Schedule General Information Rule 32). The rate shall be set forth on the NWA Statement.\nRECOVERY CHARGE\nThe Recovery Charge shall be applied per On-Peak As-Used Demand delivered under this Service Classification,\n(as explained in this Schedule General Information Rule 41). The rate shall be set forth on the Recovery Charge\nStatement.\nINCREASE IN RATES AND CHARGES:\nThe rates and charges under this Service Classification, including any adjustments and minimum charge, are increased by\nthe applicable effective percentage shown in Rule 4.J of this Schedule for service supplied within the municipality where\nthe Customer is taking service.\nTERMS OF PAYMENT:\nBills rendered under this Service Classification are payable on receipt. A late payment charge of 1½% per month shall be\nbilled on all amounts not paid by the \"past due\" date. For additional information, see Rule 4, Metering and Billing, of this\nSchedule.\nTERM:\nA minimum of one year and thereafter until terminated by 60 days written notice.\nDETERMINATION OF DEMAND:\nContract Demand:\nA customer shall have the option of accepting a Contract Demand established by the Company or of establishing its own\nContract Demand in accordance with this tariff. Without regard to which party sets the customer's Contract Demand, upon\nthe occurrence of an exceedence, the Contract Demand shall be ratcheted up by the amount of the exceedence."},{"page":427,"startToken":90649,"endToken":91252,"text":"PSC No: 19 - Electricity\nLeaf No. 245\nRochester Gas and Electric Corporation\nRevision: 4\nInitial Effective Date: January 1, 2024\nSuperseding Revision: 3\nIssued in compliance with Order in Case 15-E-0751, dated October 13, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\n1. Company Set Contract Demand (Cont d)\nWhere a customer elects to have the Company establish the Contract Demand, that customer shall not incur a\nsurcharge if that Contract Demand is exceeded except as described in this tariff. A customer shall be obligated to\ninform the Company in writing prior to the installation or removal of equipment, or any change in operation, that\ncan be reasonably expected to change in a material fashion (defined as a change of more 12.5%) the capacity\nrequired to deliver electricity to the customer. If the customer fails to provide such notice, and the customer\nexceeds the Company-established Contract Demand, the Company shall have the right to include a surcharge in\nthe customer's bill equal to the product of the applicable Contract Demand charge, the amount of the exceedence,\nand the number of billing periods from and including the billing period in which the customer first commenced\ntaking Standby Service from the Company at the understated Contract Demand, i.e., the billing period in which\nthe customer installed the equipment or changed the operation that caused the exceedence (as demonstrated by the\ncustomer to the Company in writing), to the billing period that includes the date of the exceedence. If the\ncustomer fails to demonstrate in writing when it installed such equipment or changed such operation, then the\nCompany shall apply the surcharge from the first billing period in which the customer commenced taking Standby\nService from the Company.\n2. Customer Set Contract Demand\nUpon prior written notice to the Company, a customer may revise its Contract Demand upward at any time.\nA customer that sets its own Contract Demand may revise its Contract Demand downward by written notice to the\nCompany once every 12 months. The new Contract Demand level cannot be set at a level lower than the highest\ndemand achieved in the previous 12 months unless the customer demonstrates in writing to the Company's\nreasonable satisfaction that electricity-consuming equipment is removed or disabled in place. The Company shall\nhave the right to inspect the premises of a customer upon reasonable notice and at reasonable times in order to\nconfirm that such energy-consuming equipment has been so removed or disabled.\nWhere a customer elects to establish its own Contract Demand, and (a) an exceedence of more than 0% but less\nthan 10% occurs, a surcharge shall apply to the current monthly bill equal to 12 times the sum of the monthly\nContract Demand charges calculated for the excess demand, (b) an exceedence of 10% or more but less than 20%\noccurs, a surcharge shall apply to the current monthly bill equal to 18 times the sum of the monthly Contract\nDemand charges calculated for the excess demand, and (c) an exceedence of 20% or more occurs, a surcharge\nshall apply to the current monthly bill equal to 24 times the sum of the monthly Contract Demand charges\ncalculated for the excess demand.\nWhere a new customer installs OSG, or an Existing Customer installs new OSG, during a two year period\ncommencing February 1, 2004, one exceedence in the first year of OSG operation of less than 10% in magnitude\nwould be excused from any surcharge. For purposes of this paragraph, the OSG shall be deemed to have\ncommenced operation when the OSG"},{"page":428,"startToken":91252,"endToken":91601,"text":"PSC No: 19 - Electricity\nLeaf No. 246\nRochester Gas and Electric Corporation\nRevision: 9\nInitial Effective Date: January 1, 2024\nSuperseding Revision: 8\nIssued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nAs-Used Demand:\n1.The as-used demand for customers with interval metering shall be the aggregate of the highest daily 30-\nminute integrated demand (measured in kW) occurring during the On-\ndata acquisition that results in the failure to record daily as-used demand data, the Company reserves the\nright to estimate reasonable values for the missing data for recording and billing purposes.\n2.The as-used demand, for customers without demand metering, and not billed at the OASC shall be the\nmonthly metered kilowatt hours.\nMETERING AND COMMUNICATION REQUIREMENTS:\n1. A customer with OSG and is demand-metered with 50 kW or more of Contract Demand shall be required to\nhave interval metering and remote meter reading capability. Such customers will be responsible for the\nfollowing:\na) the incremental costs of interval metering equipment and its installation;\nb) the costs of providing remote meter reading capability through telecommunications to and\nfrom the meter; and\nc) the costs associated with resolution of any problems with the telecommunications provider, including\nreimbursing the Company for any expenses the Company incurs.\n2. A customer who provides telecommunications to the meter shall be responsible for all costs\nassociated with the installation, operation and maintenance of the telecommunications line, including but not\nlimited to, all telecommunications service bills.\nIf the Company is unable to read the meter through a customer provided connection, and the Company has\ndetermined that the problem is not caused by the Company's equipment, the customer shall be responsible for\nresolution of the problem. The customer shall also be responsible for reimbursement of Company expenses\nincurred for visits to the meter location to ascertain the cause of the problem. To the extent the Company installs\nan interval meter with telecommunication capability, the Company may assess the incremental fees to the\ncustomer."},{"page":429,"startToken":91601,"endToken":91798,"text":"PSC No: 19 - Electricity\nLeaf No. 246.1\nRochester Gas and Electric Corporation\nRevision: 12\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 11\nIssued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS:\nCustomers may select from two different Supply Service Options as described below. The Company shall\noffer a Retail Access rate choice and a Non-Retail Access rate choice.\nThe Retail Access choice (see below) is the ESCO Supply Service (ESS). The Non-Retail choice is the (see\nbelow) is the RG&E Supply Service (RSS).\nThe Company shall provide only delivery service for the Retail Access choice. Electricity supply is provided\nThe Company shall provide delivery service and commodity service for the Non-Retail Access choice.\n1. ESCO Supply Service (ESS)\nThis Retail Access choice includes fixed components for the Company delivery service, a Transition\nCharge as described in Section 12.B, and a Bill Issuance Charge. Electricity supply is provided by an\nESCO.\nDelivery Rates are specified in the Delivery Charges section of this Service Classification."},{"page":430,"startToken":91798,"endToken":92133,"text":"PSC No: 19 - Electricity\nLeaf No. 246.2\nRochester Gas and Electric Corporation\nRevision: 14\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 13\nIssued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS\n2. RG&E Supply Service (RSS)\nThis Non-Retail Access choice includes fixed components for the Company delivery service, a Transition Charge\nas described in Section 12.B., a Bill Issuance Charge, and a commodity charge that fluctuates with the market\nprice of electricity and consists of energy, capacity, capacity reserves, losses, unaccounted for energy, ancillary\nservices, NYPA Transmission Access Charge (NTAC), transmission project costs allocated to the Company under\nthe NYISO tariff as approved by FERC. Electricity supply is provided by the Company.\nDelivery Rates are specified in the Delivery Charge sections of this Service Classification.\nElectricity Supply Charge\nCustomers taking service under this RSS option must select from two different options for their electricity supply\ncharge. One option is RSS\nother option is Hourly Pricing, based on hourly metered usage, as described in (b) below.\n(a) For RSS, the charge for electricity supply service shall fluctuate with the market price of electricity and shall\ninclude the following components: energy, capacity, capacity reserves, line losses, ancillary services, NYPA\nTransmission Access Charge (NTAC), transmission project costs allocated to the Company under the NYISO\ntariff as approved by FERC, Supply Adjustment Charge, and a Merchant Function Charge. Customers shall be\ncharged for energy based on their class deemed load shape using day-ahead prices adjusted for losses. They\nshall be charged for capacity based on their class deemed contribution to peak using the monthly NYISO\ncapacity auction price, including an appropriate adder for capacity reserve responsibility.\n(b) Customers whose otherwise applicable service classification is S.C. No. 8 may elect to be served under the\nHourly Pricing as described in detail below in Option 3"},{"page":431,"startToken":92133,"endToken":92365,"text":"PSC No: 19 - Electricity\nLeaf No. 246.3\nRochester Gas and Electric Corporation\nRevision: 11\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 9\nIssued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS\n3. Hourly Pricing\nMandatory:\nOnce a customer qualifies for mandatory Hourly Pricing they shall remain subject to this provision until the\nCompany determines their contract demand has been 200 KW or less for 12 consecutive months, at which time\nthe customer shall be billed under another appropriate service classification.\nVoluntary:\niod ending on or after September 22, 2012, Hourly Pricing is voluntary for any\ncustomer who would otherwise qualify for service under Service Classification No. 8\nLarge General Service\nTime of Use Rate and does not meet the phase in criteria listed above. Once a customer elects Hourly Pricing\nthey shall remain on Hourly Pricing.\nPricing:\nThis Non-Retail Access choice includes fixed components for the Company delivery service, a Transition Charge\nas described in Section 12.B, a Bill Issuance Charge, and a commodity charge that fluctuates with the market\nprice of electricity as described in Section 12.C Electricity supply is provided by the Company.\nDelivery Rates are specified in the Delivery Charges section of this Service Classification."},{"page":432,"startToken":92365,"endToken":92435,"text":"PSC No: 19 - Electricity\nLeaf No. 246.4\nRochester Gas and Electric Corporation\nRevision: 3\nInitial Effective Date: April 1, 2017\nSuperseding Revision: 2\nIssued in Compliance with Order in Case 15-E-0302, February 22, 2017.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS (Cont’d):\n3. Hourly Pricing (Cont’d)\nReserved for Future Use"},{"page":433,"startToken":92435,"endToken":92498,"text":"PSC No: 19 - Electricity\nLeaf No. 246.5\nRochester Gas and Electric Corporation\nRevision: 2\nInitial Effective Date: August 1, 2011\nSuperseding Revision: 1\nIssued in compliance with Order in Case 09-E-0717 issued and effective May 20, 2011\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nReserved For Future Use"},{"page":434,"startToken":92498,"endToken":92742,"text":"PSC No: 19 - Electricity\nLeaf No. 247\nRochester Gas and Electric Corporation\nRevision: 5\nInitial Effective Date: December 1, 2016\nSuperseding Revision: 4\nIssued in compliance with Order in Case 16-E-0497 issued November 17, 2016.\nISSUED BY: James A. Lahtinen, Vice President Rates and Regulatory Economics, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nThe Customer is responsible for its appropriate share of any penalties incurred by the Company from the NYISO, or\nothers, for unscheduled energy use. The penalties include, but are not limited to, congestion costs, marginal losses,\nand installed or unforced capacity deficiencies.\nINTERCONNECTION REQUIREMENTS:\n1. A customer may connect an OSG facility for parallel operation with the Company’s delivery system, or isolate\nfor operation with Standby Service provided by a wholesale generator by means of a double throw transfer switch,\nor another transfer switching scheme acceptable to the Company.\n2. A customer must complete an Application for Service and must operate in compliance with standards and\nrequirements set forth in either the Distributed Generation Interconnection Requirements found in the SIR\nAddendum to this Schedule at Section II, “Interconnection Requirements” or RG&E’s Bulletin 86-01 In addition,\ncustomers must execute either the NYS Standardized Contract For Interconnection of New Distributed Generation\nUnits With Capacity of 300 kVA or Less, or Farm Waste Generators of 2,000 kW of Less, to be Operated in Parallel\n(“SIR Contract”), as contained in the SIR Addendum to this Schedule, or the applicable contract."},{"page":435,"startToken":92742,"endToken":93230,"text":"PSC No: 19 - Electricity\nLeaf No. 248\nRochester Gas and Electric Corporation\nRevision: 4\nInitial Effective Date: May 1, 2017\nSuperseding Revision: 3\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\n3. A customer and the Company shall agree as to the operating mode, interconnection and equipment specifications\nfor the OSG facility pursuant to either a or b below, as may be amended or superseded:\na) the SIR Contract, or\n-01.\n4. A customer shall be responsible for all costs associated with its OSG interconnection as set forth in the\nrequirements listed in paragraphs 3a or 3b above, as applicable.\n5. Maintenance Schedules: A customer applying for Standby Service with a standby Contract Demand greater than\n1000 kW is required to provide the Company with a schedule of OSG maintenance. A schedule must include the\ndates and times for the beginning and ending of all planned outages. A customer may revise the schedule one month\nshall not be allowed, unless the customer obtains Company approval. The annual provision of planned maintenance\nschedules by the customer shall take place on October 1 of each year for Standby Service for the following calendar\nyear. Such schedule shall be utilized by the Company for planning functions. This provision does not take\nprecedence with respect to any OSG maintenance provision in a power purchase agreement that may be in effect\nwith the Company.\n6. At the time of agreement, the customer with an OSG greater than 300 kVA, excluding Net Metered Farm Waste\nGenerators less than 2,000 kW, may select the payment method for paying the Company operations and\nmaintenance charges on the interconnection equipment paid for by the customer but owned by the Company. The\ncustomer may select to pay either the actual charges for maintenance, as they may occur, or the customer may\ntotal investment in such equipment. The operations and maintenance costs on such equipment is billed on a monthly\nbasis pursuant to the applicable contract or agreement.\n7. NAERC Guidelines: A customer taking Standby Service shall comply with all reliability criteria, guidelines, and\nprocedures established by the North America\namended or superseded. Such compliance is necessary to ensure the continued reliability of North America's\ninterconnected electric transmission electric systems.\nUNAUTHORIZED OSG INTERCONNECTION BY CUSTOMER:\nIf a customer connects OSG to its electric system without: (a) notifying the Company; and (b) executing an\nappropriate Standby Service Application, and thereafter the Company discovers the interconnection, the Company\nshall backbill the customer for all Standby Service rendered subsequent to the estimated connection of such OSG.\nIn preparing such backbills, the Company shall assess a Standby Service Contract Demand surcharge equal to two\ntimes that which would otherwise be computed under the Determination of Demand Provision, paragraph 1\n(Company Set Contract Demand) of this Service Classification, and assume the standby Contract Demand had been\ninappropriately established at 0 kW."},{"page":436,"startToken":93230,"endToken":93818,"text":"PSC No: 19 - Electricity\nLeaf No. 249\nRochester Gas and Electric Corporation\nRevision: 8\nInitial Effective Date: June 1, 2021\nSuperseding Revision: 7\nIssued in compliance with Order in Case 19-E-0079, dated May 14, 2021.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nSPECIAL PROVISIONS FOR CUSTOMERS WITH ON-SITE GENERATION:\n(a) Demand Metered Customer With Less Than 50 kW of Contract Demand:\nA customer with a Contract Demand of less than 50 kW without interval metering shall be billed at the OASC rate.\nA customer with a Contract Demand of less than 50 kW can choose to be served at the standby rate, provided that\nthe customer pays all one-time and ongoing costs associated with the purchase and installation of an interval meter,\nService Classification.\n(b) Small Customer Exclusion:\nSmall customers, defined as those customers qualifying for service under Service Classification No. 1\nResidential,\nService Classification No. 2 - Small General Service, or Service Classification No. 4\nResidential Service\nTime-of-Use Rate, shall be billed at the OASC rate instead of the Standby Service rate. This exemption shall be\ndiscontinued upon the date that 150 standby customers are billed under this provision, provided, however, that the\ndiscontinuance of this exemption shall not affect any customer that received the exemption prior to the date of\ndiscontinuance, which customers shall continue to receive the exemption until the conclusion of the phase-in\nl Standby Service Rate Phase-\n(c) Power Factor Adjustment:\nApplicable to customers not subject to a reactive charge, i\nis so operated that the maximum kilovolt-amperes of lagging reactive demand exceed 48% of the maximum kW\ndemand during the billing month, the Customer shall remedy that condition in a manner deemed adequate by the\nCompany, by either:\n1. Installing and maintaining at its own expense the power factor corrective equipment deemed\nnecessary by the Company to remedy the condition, or\n2. Making a cash contribution of the actual reasonable cost of any power factor corrective\nequipment installed by the Company on its side of the point of delivery to affect such correction.\n(d) Individually Negotiated Contracts:\n1. Individual Agreements for Customers Considering Isolation\nThe Company is authorized to offer individually negotiated agreements for Standby Service to customers that may\ninstall back-up generation and disconnect their premises from the Company system in lieu of taking tariff Standby\nService. The customer must document that it can physically, environmentally, and economically isolate from the\nCompany's grid by installing and operating back-up generation at a lower cost than paying for Standby Service, and\nthat such option is the alternative the customer shall select if the Company does not offer a negotiated rate\nalternative. At a minimum, the negotiated rate agreement must provide for recovery of the Company\ncosts plus a reasonable contribution to the Company's recovery of its fixed costs. The Company shall respond to a\ncustomer application for a negotiated rate agreement within 90 days of its receipt with a negotiated rate agreement\noffer or a written explanation for its rejection of the application. Either party may seek from Staff a non-binding\nresolution of a dispute over the negotiation of such an individual rate agreement. In the event of a conflict between\nany provision of an agreement negotiated pursuant to this authority and any inconsistent provision of the Company\nJoint Proposal filed April 15, 2003 in Case 02-E-0551 or the standby rate provisions of the Company's tariff on the\nsame subject, the provision of the negotiated agreement shall take precedence and control."},{"page":437,"startToken":93818,"endToken":94474,"text":"PSC No: 19 - Electricity\nLeaf No. 250\nRochester Gas and Electric Corporation\nRevision: 9\nInitial Effective Date: January 1, 2024\nSuperseding Revision: 8\nIssued in compliance with Order in Case 15-E-0751, dated October 13, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nSPECIAL PROVISIONS FOR CUSTOMERS WITH ON-SITE GENERATION\n2. Individual Agreements for Customers Selling into the Wholesale Market\nThe Company is authorized to offer individually negotiated agreements for Standby Service with customers that sell\ninto the market, or to a third party, no less than 90% of their site's energy output, net of station power requirements,\nfrom generators located on the site having a total name plate rating equal to or greater than 50 MW. The rates and\ncharges negotiated shall reflect, where applicable, the characteristics of the specific interconnection arrangements,\nincluding, but not limited to, the voltage level of the interconnection, whether the interconnection is bi-directional,\nand the nature of the Company facility where the generator is interconnected with the Company system. The\nCompany shall respond to a customer application for a negotiated rate agreement within 90 days of its receipt with a\nnegotiated rate agreement offer or a written explanation for its rejection of the application. Either party may seek\nfrom Staff a non-binding resolution of a dispute over the negotiation of such an individual rate agreement. In the\nevent of a conflict between any provision of an agreement negotiated pursuant to this authority and any inconsistent\n-E-0551 or the standby rate provisions of\ncontrol.\n(e)\nCustomers who qualify for the Recharge NY Power Program pursuant to Section 4.L.5 of the General Information\nSection of this Schedule, shall have such power billed in accordance with the provision therein, as provided in\nSection 4.L.5, the maximum metered demand will be used in the load share calculation for all standby customers.\nThe customer's power requirements in excess of the RNY Power allocation shall be billed in accordance with the\nESCO Supply Service rate or the RG&E Supply Service rate of this Service Classification.\n(f) Reliability Credit\n1.\nStandby Customers with OSG shall be provided an opportunity to earn credits against their contract\ndemand charges. The credit would be earned by reliably reducing load below the contract demand over a\ndefined Measurement Period. During the 5-year phase-in period the calculation of the Reliability Credit\n-in Contract Demand Charge. A customer that elects to\nbe billed at the new rates in lieu of the phase in shall no longer receive a Reliability Credit. The Reliability\nCredit will be phased out and completely eliminated effective January 1, 2029, for all customers.\n2.\nFor purposes of this Credit, the Measurement Period is weekdays from 7:00 am to 11:00 pm during the\nprevious two consecutive full Summer periods; provided however, that the first year in which a Customer\nseeks a Credit, the Measurement Period is weekdays from 7:00 am to 11:00 pm during the previous full\nSummer period only. The Measurement Period shall exclude Outage Events, as selected by the Customer,\nas well holidays (i.e., Independence Day (observed) if it falls on a weekday and Labor Day).\nFor purposes of this Credit, the Summer Period is June 1 through September 30.\n3.\nOutage Events are up to three time blocks for each Summer Period that, in aggregate, are comprised of no\nmore than five 24-hour time periods, excluding weekends and holidays. If a time block contains a time\nperiod of less than 24 hours, the time period shall be rounded up to the next 24 hours (i.e., the 24-hour\nperiods cannot be applied on a partial basis). If a time block encompasses a holiday or weekend, the start\nof the 24-hour period on the day prior to the holiday or weekend until the same hour the next business day\nshall be considered to be a single 24-hour period."},{"page":438,"startToken":94474,"endToken":94999,"text":"PSC No: 19 - Electricity\nLeaf No. 251\nRochester Gas and Electric Corporation\nRevision: 5\nInitial Effective Date: December 1, 2020\nSuperseding Revision: 4\nIssued in compliance with Order in Case No. 19-E-0380, dated November 19, 2020.\nISSUED BY: Joseph J. Syta, Vice President Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nSPECIAL PROVISIONS FOR CUSTOMERS WITH ON-SITE GENERATION\n(f) Reliability Credit\n4.\nThe Credit for any Measurement Period shall\nmultiplied by the Contract Demand Delivery Charge per kW that is in effect on October 1 of the year in which the\nCredit is determined. The Credit shall\ncommencing in November until the following October. If a customer is billed under Special Provision (g) of this\nService Classification, the Outage Events for all Standby Supplied Accounts shall be the same and shall be specified\nby the Standby Generation Account. Each Standby Supplied\nshall be calculated individually.\n5.\nA customer seeking a Credit must request such credit by October 14 of each year for which the Credit is sought and,\nat the same time, specify the Outage Events the customer requests to be excluded from the measurement period. If\nOctober 14 falls on a weekend or holiday, the Company shall accept requests until the next business day. Prior to\nOctober 14, the Company shall notify customers of their need to request the applicable Credit.\n6.\nCredits provided to standby customers shall be recovered from all customers, including standby customers, through\nthe applicable Transition Charge.\n7.\nA DER that receives compensation pursuant to Rule 26.B.Value Stack, for exports to the system, or a demand-\nmetered customer without OSG that opts to select the applicable rates under this Service Classification in lieu of the\nrates under their OASC, are excluded from receiving the Reliability Credit.\ni.\nA customer with grid-connected electric energy storage system or a DER that receives compensation\npursuant to Rule 26.B. Value Stack, for exports to the system is excluded from receiving the Reliability\nCredit.\n(g) Standby Offset\nA customer with qualifying on-\nm may use its excess\ngeneration to supply two or more Standby Supplied Accounts as long as all of the requirements in this provision are\nmet.\nDefinitions\nStandby Generation Account: The customer meter where the generating equipment is located and\ninterc\nStandby Supplied Accounts: Additional meters billed under this standby service class designated by the\nStandby Generation Account for the application of excess generation that meet the Standby Supplied Account\nrequirements listed below.\nEligibility\n1.\nStandby Generation Account\na.\nThe Standby Generation Account\nbut no more than 20 MW; and (ii) meet eligibility criteria for designation as\n-E-\n0551, except with respect to maximum generating capacity. The generating facility may have more than\none generating unit so long as the aggregate nameplate rating conforms to (i) above\nb.\nThe Standby Generation Account must have interval metering and meet the interval metering and\ntelecommunication requirements of this service class before they shall be eligible for the offset provision.\nThe meter and tele\nexcess generation must be provided and maintained at the customer\nexpense, and must be operational\nbefore the customer may take service under this provision."},{"page":439,"startToken":94999,"endToken":95376,"text":"PSC No: 19 - Electricity\nLeaf No. 252\nRochester Gas and Electric Corporation\nRevision: 2\nInitial Effective Date: July 1, 2019\nSuperseding Revision: 1\nIssued in compliance with Order in Case 15-E-0751, dated May 16, 2019.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nSPECIAL PROVISIONS FOR CUSTOMERS WITH ON-SITE GENERATION\n(g) Standby Offset\nEligibility\n1.\nStandby Generation Account\nd)\nc.\nAll interconnection requirements of this service class must be met before an account shall be\neligible for the offset provision. In addition, the interconnection must be technically and\neconomically practicable, and the connection and operation of such facility shall not jeopardize the\nd.\nAccounts that are eligible for net metering, remote net metering, community net metering, standby\nexemption, NYPA allocations including RNY, or economic development rates are not eligible for\nthis offset provision.\ne.\nEach Standby Generation Account shall be billed with the applicable standby service rates in this\nservice class.\nf.\nEach Standby Generator Account is eligible for the supply options as described in this service\nclass.\ng.\nCustomers that have a Standby Generation Account\nBuy\nBack service, Service Classification No. 5, if the export of the generating facility exceeds the\naggregate registered kWh usage on the Standby Generation Accounts and the Standby Supplied\nAccounts.\n2.\nStandby Supplied Accounts\nThe Standby Supplied Accounts designated by the Standby Generation Account customer must all be\nestablished in a single c\na.\nThe Standby Generation Account and the Standby Supplied Accounts designated by the customer\nto receive the output of the generating facility may be established in two or more customer\nnames\n-\n(1) at least one of the Standby Supplied Accounts must be in the same customer name as the\nStandby Generation Account (owner or operator of the generating facility or\n) and\nhave a Contract Demand equal to 10% or more of the nameplate rating of the generating\nfacility;\n(2) the Sponsor shall be responsible for coordinating the interconnection and operation of the\ngenerating facility with the Company; and\n(3) at the time of application under the Multi-Party Offset, the Sponsor must submit a signed\napplication for all Standby Supplied Accounts to be\ngenerating facility and a signed Percentage Allocation Form. Both forms shall be available on"},{"page":440,"startToken":95376,"endToken":95712,"text":"PSC No: 19 - Electricity\nLeaf No. 252.1\nRochester Gas and Electric Corporation\nRevision: 2\nInitial Effective Date: January 1, 2024\nSuperseding Revision:\n1\nIssued in compliance with Order in Case 15-E-0751, dated October 13, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nSPECIAL PROVISIONS FOR CUSTOMERS WITH ON-SITE GENERATION\n(g) Standby Offset\nEligibility\n2.\nStandby Supplied Accounts\nb.\nThe Standby Generation Account, and the Standby Supplied Accounts must all be located within a\nsingle\nonly\n(1)\nmore than one building\nand/or parcel of land proximate to each other if there is common use, whether or not such\nAll of the Standby Supplied\nmust be within the same load zone as determined by the Locational Based Market Price. The\naccounts of a customer whose buildings or parcels of land are not physically interconnected\nc\nproximity and common Company facilities to the Company.\n(2)\nUnder Multi-\nwhich each customer is connected to the generating facility by private thermal loop that\ndelivers steam, hot water, or chilled water.\nc.\nEach Standby Supplied Account shall have no other source of generation located on the premises\nand shall not participate under the provisions of remote net metering, net metering for customer\ngenerators, or Community Distributed Generation.\nd.\nEach Standby Supplied Account and the export of the Standby Generation Account must be\nseparately metered using Commission-approved, revenue grade, interval metering with\ncommunication systems.\ne.\nEach Standby Supplied Account shall be billed with the applicable standby service rates in this\nservice class.\nf.\nEach Standby Supplied Account must have interval metering and meet the interval metering and\ntelecommunication requirements of this service class before they shall be eligible for the offset\nprovision. The meter and telecommunications for each Standby Supplied Account must be\nprovided and maintained at the customer\nexpense, and must be operational before the customer\nmay take service under this provision.\ng.\nEach Standby Supplied Account is eligible for the supply options as described in this service class."},{"page":441,"startToken":95712,"endToken":96074,"text":"PSC No: 19 - Electricity\nLeaf No. 253\nRochester Gas and Electric Corporation\nRevision: 2\nInitial Effective Date: July 1, 2019\nSuperseding Revision: 1\nIssued in compliance with Order in Case 15-E-0751, dated May 16, 2019.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nSPECIAL PROVISIONS FOR CUSTOMERS WITH ON-SITE GENERATION\n(g) Standby Offset\nEligibility:\n3.\nBilling Applicable to Each Standby Supplied Account\na.\nCustomer Charge\nThe Customer Charge and meter charges for each account (the Standby Generation Account and\nthe Standby Supplied Accounts) shall be equal to the customer and meter charges listed in this\nservice class plus the additional Customer Charge listed below.\nb.\nContract Demand\nThe Contract Demand for each account (the Standby Generation Account and the Standby\nSupplied Accounts) shall be determined based on the maximum potential demand on the\nsources.\n4.\nFor Accounts Supplied under the Single Party Offset:\nFor purposes of this Offset Provision, the following definitions apply:\nAllocated As-\nmeans, for each Standby Supplied Account supplied by the\nexcess generation, the demand registered on the Standby Supplied\nAccount\nby the lower of: (a) 1 or (b) the ratio of the Standby Generating\nexcess generation measured in kWs to the sum of demands on the meters of all Standby\nSupplied Accounts.\nmeans, for each Standby Supplied Account supplied by the Standby\nexcess generation, the demand registered on the\nmeter(s) multiplied by the lower of: (a) 1 or (b) the ratio of the\nexcess generation measured in kWhs to the sum of the kWhs registered on the meters of the Standby\nSupplied Accounts.\nAllocated As-used Generator Demand and Allocated Generator Supply shall be determined for each\n15-minute interval. Adjustments shall be made for transformation losses as applicable.\n5.\nFor Accounts Supplied under the Multi-Party Offset:\nFor purposes of this Offset Provision, the following definitions apply:\n-\nStandby Supplied Account, the lower of:\n(a) the demand registered on the Standby Supplied Account or (b) the demand registered on the\nStandby Supplied\nlied by the Standby Supplied\nStandby Supplied Account,\nthe excess amount shall not be redistributed to other accounts nor carried forward to the succeeding\nbilling period."},{"page":442,"startToken":96074,"endToken":96451,"text":"PSC No: 19 - Electricity\nLeaf No. 253.1\nRochester Gas and Electric Corporation\nRevision: 1\nInitial Effective Date: July 1, 2019\nSuperseding Revision: 0\nIssued in compliance with Order in Case 15-E-0751, dated May 16, 2019.\nISSUED BY: Joseph J. Syta, Vice President, Conroller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nSPECIAL PROVISIONS FOR CUSTOMERS WITH ON-SITE GENERATION\n(g) Standby Offset\nEligibility:\n5.\nFor Accounts Supplied under the Multi-Party Offset\n:\nStandby Supplied Account, the lower of: (a) the total\nkWhs registered on the Standby Supplied\nkWhs registered on the\nmultiplied by the Standby Supplied\noutput multiplied by the Standby Supplied\nkWhs registered on the Standby Supplied\nmeter(s), the excess amount shall be credited to the extent described in Service Classification 14,\nSpecial Provision (g)1.b.\nthat the Sponsor\nhas allocated to each Standby Supplied Account under the Multi-Party Offset. A single percentage\nshall be applied to both the Allocated As-Used Generator Demand and the Allocated Generator\nSupply.\nThe Percentage Allocations must total 100%, of which the Sponsor must establish:\na.\na Percentage Allocation of 10% or more to a single Standby Supplied Account in the\nb.\na Percentage Allocation of no less than 5% or more than 90% to each additional Standby\nSupplied Account. The Standby Supplied Accounts and the Percentage Allocation to each\nmust be assigned in writing by the Sponsor, using the Percentage Allocation Form, at least 30\ndays before commencing service under the Multi-Party Offset. The Percentage Allocations\nand the Standby Supplier Accounts may be changed as described on the form. No credits shall\nbe applied if the Sponsor ceases to have a Standby Supplied Account or ceases to own or\noperate the generating facility. If a Standby Supplied Account is closed, its credits shall be\n6.\nEach Standby Supplied Account shall be billed under Standby Service rates listed in this service\nclass, as modified below:\na.\nAn additional Customer Charge of $50.00 per account per billing period, shall be applicable\nto cover incremental billing and administrative costs associated with providing service under\nthis provision.\nb.\nThe per-kWh delivery charges and adjustments described in this service class shall be applied\nto the total kWhs registered on\nSupply for each 15-minute interval (adjusted for losses as applicable)."},{"page":443,"startToken":96451,"endToken":96752,"text":"PSC No: 19 - Electricity\nLeaf No. 254\nRochester Gas and Electric Corporation\nRevision: 3\nInitial Effective Date: July 1, 2019\nSuperseding Revision: 2\nIssued in compliance with Order in Case 15-E-0751, dated May 16, 2019.\nISSUED BY: Joseph J. Syta, Vice President, Controller and Treasurer, Rochester, New York\nSERVICE CLASSIFICATION NO. 14\nSTANDBY SERVICE (Cont'd)\nSPECIAL PROVISIONS FOR CUSTOMERS WITH ON-SITE GENERATION\n(g) Standby Offset\nEligibility:\n6.\nEach Standby Supplied Account shall be billed under Standby Service rates listed in this service\nclass, as modified below:\nc.\nFor each 15-\nshall be\nreduced by the Allocated Generator Demand for purposes of determining the daily\nmaximum demand that is used for billing As-used Daily Demand Delivery Charges.\nd.\nIf the Customer purchases supply from the Company, the per-kWh supply charges and\nadjustments described in this service class shall be applied to the total kilowatthours\nh\n15-minute interval (adjusted for losses as applicable).\n7.\nThe Allocated As-used Generator Demand and Allocated Generator Supply shall be assumed to be\nzero for time periods where there is insufficient interval data available to ascertain that the\nGenerating Facility supplied output to any associated Standby Service account.\n8.\nThe Reactive Charge shall be calculated as described in this service class and shall not be adjusted\nby this provision.\n(h)\n1.\nA customer that is not participating in Special Provision (f.) or Special Provision (g.) herein may opt\nto participate in Rule 26.B, Value Stack, with a qualifying generator (i.e. a CES Tier 1 eligible\ngenerator as provided in Rule 26.B.1.a.iii) for compensation of net hourly injections. The Company\nshall install appropriate metering capable of recording the net hourly consumption and injection for\nthe customer. The customer shall be responsible for the cost of the meter, the installation, and any\nadditional costs."},{"page":444,"startToken":96752,"endToken":96768,"text":"Rochester Gas and Electric Corporation \nService Classification 15: Optional Demand Service \nOtherwise Applicable Service Class 8"},{"page":445,"startToken":96768,"endToken":97197,"text":"PSC No: 19 - Electricity\nLeaf No. 255\nRochester Gas and Electric Corporation\nRevision: 0\nInitial Effective Date: January 1, 2024\nSuperseding Revision:\nIssued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Rochester, New York\nSERVICE CLASSIFICATION NO. 15\nOPTIONAL DEMAND SERVICE RATE\nAPPLICABLE TO USE OF SERVICE FOR:\nA customer without On Site Generation (OSG), or a customer that installs OSG with a total nameplate rating less than\n15% of its load, may opt to take service pursuant to this service classification.\nphased in approach at a future date consistent with Order issued on October 13, 2023, under Case No. 15-E-0751.\nCHARACTER OF SERVICE:\nContinuous, Alternating Current -\nA customer that installs OSG with a total nameplate rating less than 15% of its load shall comply with all federal, state and\nlocal laws, regulations, and requirements, including the requirements listed below in the Interconnection Requirements\nparagraphs 1 through 7.\nRATE PERIODS:\nSummer Super-Peak hours\nFrom 2:00 pm until 6:00 pm\nSummer months are June, July, August, and\nSeptember\nSummer On-Peak hours\nFrom 7:00 am until 2:00 pm and\nFrom 6:00 pm until 11:00 pm\nNon-Summer On-Peak hours\nFrom 7:00 am until 11:00 pm\nNon-Summer months are October,\nNovember, December, January, February,\nMarch, April, and May\nOff-Peak hours\nAll other hours including\nHolidays*\nSUPPLY SERVICE OPTIONS AVAILABLE TO CUSTOMERS:\nCustomers may select from two different Supply Service Options as described below. The Company shall offer a Retail\nAccess rate choice and a Non-Retail Access rate choice.\nThe Retail Access choice (see below) is the ESCO Supply Service (ESS). The Company shall provide only delivery\nThe Non-Retail choice is Hourly Pricing. The Company shall provide delivery service and commodity service for the\nNon-Retail Access choice.\n1.\nESCO Supply Service (ESS)\nThis Retail Access choice includes fixed components for the Company delivery service, a Transition Charge as\ndescribed in Section 12.B, and a Bill Issuance Charge. Electricity supply is provided by an ESCO and settled as\ndescribed in Section 11.D.3. Delivery Rates are specified in the Delivery Charges section of this Service\nClassification.\n2.\nHourly Pricing\nThis Non-Retail Access choice includes fixed components for the Company delivery service, a Transition Charge as\ndescribed in Section 12.B, a Bill Issuance Charge, and a commodity charge that fluctuates with the market price of\nelectricity as described in Section 25.I.C. Electricity supply is provided by the Company. Delivery Rates are\nspecified in the Delivery Charges section of this Service Classification."},{"page":446,"startToken":97197,"endToken":97370,"text":"PSC No:  19 - Electricity \n \n \nLeaf No. 256 \nRochester Gas and Electric Corporation \n \n \nRevision:  2 \nInitial Effective Date: June 1, 2026 \n \n \nSuperseding Revision:  0 \nIssued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026. \n \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York \n \nSERVICE CLASSIFICATION NO. 15 \n \nOPTIONAL DEMAND SERVICE RATE (Cont’d) \n \nRATES:  \n \nDelivery Charges: The rate components of the delivery portion of this service: Customer Charge, Bill Issuance \nCharge, Contract Demand Charge, and Daily As-Used Demand. \n \n1. Customer Charges \n \nPer customer, per month. \n \nCustomer's OASC: \nEffective Date \n \n \n6/01/2026 \nSC No. 1  \n$23.00 \nSC No. 2 \n$23.00 \nSC No. 3 \n$401.00 \nSC No. 7  \n$162.00 \nSC No. 8 - Secondary \n$1,725.00 \nSC No. 8 - Substation  \n$3,875.00 \nSC No. 8 - Primary \n$2,175.00 \nSC No. 8 - Sub Transmission-Industrial \n$4,300.00 \nSC No. 8 - Sub Transmission-Commercial \n$4,050.00 \nSC No. 8 - Transmission \n$6,400.00 \n  \n \n \nBill Issuance Charge (per bill): $0.99, as described in Rule 11.F"},{"page":447,"startToken":97370,"endToken":97638,"text":"PSC No:  19 - Electricity \n \n \nLeaf No. 257 \nRochester Gas and Electric Corporation \n \n \nRevision:  2 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  0   \nIssued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026. \n \nISSUED BY:  Lindsey N. Overton Orietas, Vice President, Regulatory, Rochester, New York \nSERVICE CLASSIFICATION NO. 15 \n \nOPTIONAL DEMAND SERVICE RATE (Cont’d) \n \n2. Contract Demand Charge: The Contract Demand Charge is determined by multiplying the Customer’s \nContract Demand times the Contract Demand rate.  \n \n \n \n \nEffective Date \nCustomer's OASC: \n6/01/2026 \nSC No. 1  \n$6.22 \nSC No. 2 \n$6.47 \nSC No. 3 \n$4.32 \nSC No. 7  \n$3.18 \nSC No. 8 - Secondary \n$1.08 \nSC No. 8 - Substation  \n$0.00 \nSC No. 8 - Primary \n$3.73 \nSC No. 8 - Sub Transmission-Industrial \n$1.17 \nSC No. 8 - Sub Transmission-Commercial \n$1.91 \nSC No. 8 - Transmission \n$2.41 \n  \n3. As-Used Demand Charge: Daily As-Used Demand Charge, on-peak kW or super-peak, per kW of daily \nmetered demand. \n \nEffective 6/01/2026 \n \nCustomer's OASC: \nOn-Peak \nSuper-Peak \nSC No. 1  \n$0.17219 \n$0.34438 \nSC No. 2 \n$0.21087 \n$0.42174 \nSC No. 3 \n$0.64635 \n$1.29269 \nSC No. 7  \n$0.67920 \n$1.35841 \nSC No. 8 - Secondary \n$0.66614 \n$1.33228 \nSC No. 8 - Substation  \n$0.44363 \n$0.88727 \nSC No. 8 - Primary \n$0.55341 \n$1.10682 \nSC No. 8 - Sub Transmission-Industrial \n$0.48723 \n$0.97446 \nSC No. 8 - Sub Transmission-Commercial \n$0.59360 \n$1.18720 \nSC No. 8 - Transmission \n$0.35968 \n$0.71935 \n \n4. Non-Bypassable Charge: \n All kWh  \n \n \n \nPer Transition Charge Statement. \n \n REACTIVE CHARGE:  \n Reactive kilovolt-ampere hours, per billing reactive kilovolt-ampere hour:    $0.00127"},{"page":448,"startToken":97638,"endToken":97705,"text":"PSC No:  19 - Electricity \n \n \nLeaf No. 257.1 \nRochester Gas and Electric Corporation \n \n \nRevision:  2 \nInitial Effective Date:  June 1, 2026 \n \n \nSuperseding Revision:  0 \nIssued in compliance with Order in Case No. 25-E-0379, dated May 14, 2026. \n \nISSUED BY:  Lindsey N. Overton Orietas, Vice President – Regulatory, Rochester, New York \nSERVICE CLASSIFICATION NO. 15 \n \nOPTIONAL DEMAND SERVICE RATE (Cont’d) \n \n3. As-Used Demand Charge: (Cont’d) \n \nReserved for Future Use"},{"page":449,"startToken":97705,"endToken":98010,"text":"PSC No: 19 - Electricity\nLeaf No. 258\nRochester Gas and Electric Corporation\nRevision: 1\nInitial Effective Date: January 1, 2025\nSuperseding Revision: 0\nIssued in compliance with Order in Case No. 24-E-0493, dated December 19, 2024.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Rochester, New York\nSERVICE CLASSIFICATION NO. 15\nOPTIONAL DEMAND SERVICE RATE\nMERCHANT FUNCTION CHARGE ( MFC ):\nAll kW hours, per kWh, Per MFC Statement, as described in Rule 12\nSYSTEM BENEFITS CHARGE\n:\nEach customer bill for service under this Service Classification shall be increased by multiplying all kWh delivered\nby the applicable System Benefits Charge rate shown in the System Benefits Charge Statement.\n-\nThe EV Surcharge shall be applied per kWh delivered under this Service Classification, (as explained in this\nSchedule General Information Rule 33). The rate shall be set forth on the EVMR Statement\nOASC (sub-classification) as provided in this Service Classification shall determine the applicable\nRevenue Decoupling Adjustment (as explained in this Schedule, General Information Section 7). See RDM\nStatement.\nThe RAM shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as explained\nin in this Schedule General Information Rule 24). See RAM Statement.\nEARNINGS ADJUSTMENT MECHANISM ( EAM) :\nThe EAM shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as explained\nin this Schedule General Information Rule 4.K). The rate shall be set forth on the EAM Statement.\nNON-WIRES ALTERNATIVE ( NWA ) SURCHARGE:\nThe NWA Surcharge shall be applied per On-Peak As-Used Demand delivered under this Service Classification, (as\nexplained in this Schedule General Information Rule 32). The rate shall be set forth on the NWA Statement.\nRECOVERY CHARGE:\nThe Recovery Charge shall be applied per On-Peak As-Used Demand delivered under this Service Classification,\n(as explained in this Schedule General Information Rule 41). The rate shall be set forth on the Recovery Charge\nStatement."},{"page":450,"startToken":98010,"endToken":98222,"text":"PSC No: 19 - Electricity\nLeaf No. 258.1\nRochester Gas and Electric Corporation\nRevision: 0\nInitial Effective Date: January 1, 2025\nSuperseding Revision:\nIssued in compliance with Order in Case No. 24-E-0493, dated December 19, 2024.\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Rochester, New York\nSERVICE CLASSIFICATION NO. 15\nOPTIONAL DEMAND SERVICE RATE\nMINIMUM CHARGE:\nThe minimum charge per month for service under this Service Classification is the Contract Demand Charge if\napplicable, plus the Customer Charge and Bill Issuance Charge, if applicable, as listed above.\nINCREASE IN RATES AND CHARGES:\nThe rates and charges under this Service Classification, including any adjustments and minimum charge, are\nincreased by the applicable effective percentage shown in Rule 4.J of this Schedule for service supplied within the\nmunicipality where the Customer is taking service.\nTERMS OF PAYMENT:\nBills rendered under this Service Classification are payable on receipt. A late payment charge of 1½% per month\nshall be billed on all amounts not paid by the \"past due\" date. For additional information, see Rule 4, Metering and\nBilling, of this Schedule.\nTERM:\nIf a customer opts-in to this Service Classification, the customer shall remain on this Service Classification for a\nminimum of one year and thereafter until terminated by 60 days written notice."},{"page":451,"startToken":98222,"endToken":98530,"text":"PSC No: 19 - Electricity\nLeaf No. 259\nRochester Gas and Electric Corporation\nRevision: 0\nInitial Effective Date: January 1, 2024\nSuperseding Revision:\nIssued in compliance with Order in Case No. 15-E-0751, dated October 13, 2023\nISSUED BY: Jeremy J. Euto, Vice President\nRegulatory, Rochester, New York\nSERVICE CLASSIFICATION NO. 15\nOPTIONAL DEMAND SERVICE RATE\nDETERMINATION OF DEMAND:\n1.\nContract Demand:\nFor mass-market customers, the Company shall use the metered demand for the billing month of the first\nContract Demand will increase. The Contract Demand will only be decreased if the Companies determine\n-billed customer, the Companies propose to\n-month period for the first bill. Thereafter,\nsimilar to the mass-market customers, if the metered demand increases, the Contract Demand will increase.\nchanged.\n2.\nAs-Used Demand:\na)\nThe as-used demand for mass market customers (a customer whose otherwise applicable service\nclassification is non-demand billed) with interval metering will be sum of the highest daily 60- minute\nintegrated demand (measured in kW) measured on the clock-hour occurring during the On-Peak hours as\n. For all other customers, the as-used demand for\ncustomers with interval metering will be the aggregate of the highest daily 30- minute integrated demand\n(measured in kW) occurring during the On-Peak hours as defi\nbilling period. If in any billing period, there is a failure in the metered usage data acquisition that results in\nthe failure to record daily as-used demand data, the Company reserves the right to estimate reasonable\nvalues for the missing data for recording and billing purposes.\nMETERING AND COMMUNICATION REQUIREMENTS:\na)\nA customer shall be required to have an Advanced Metering Infrastructure (AMI) meter as described in\nRule 4.A.2), to be eligible for this service classification.\nb)\nA customer that elects to opt-out of receiving an AMI meter pursuant to Rule 4.A.2), is ineligible to take\nservice under this service classification."}],"sections":[{"p":1,"at":0,"title":"Attachment I","method":"printed heading","endPage":3,"endAt":0,"startToken":0,"endToken":77},{"p":3,"at":0,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":5,"endAt":0,"startToken":77,"endToken":151},{"p":5,"at":0,"title":"Attachment I","method":"printed heading","endPage":6,"endAt":0,"startToken":151,"endToken":215},{"p":6,"at":0,"title":"Attachment I","method":"printed heading","endPage":6,"endAt":32,"startToken":215,"endToken":221},{"p":6,"at":32,"title":"I. INTRODUCTION","method":"printed heading","endPage":6,"endAt":117,"startToken":221,"endToken":233},{"p":6,"at":117,"title":"A. My name is Brian McNierney. My business address is 18 Link Drive, Binghamton, New","method":"printed heading","endPage":6,"endAt":806,"startToken":233,"endToken":342},{"p":6,"at":806,"title":"A. In 1986, I graduated from St. Bonaventure University with a Bachelor of Business","method":"printed heading","endPage":6,"endAt":1222,"startToken":342,"endToken":408},{"p":6,"at":1222,"title":"A. Yes, I have submitted testimony in New York Public Service Commission (“NYPSC” or","method":"printed heading","endPage":7,"endAt":0,"startToken":408,"endToken":443},{"p":7,"at":0,"title":"Attachment I","method":"printed heading","endPage":7,"endAt":98,"startToken":443,"endToken":459},{"p":7,"at":98,"title":"A. My name is Carol Teixeira. My business address is 300 Erie Boulevard West, Syracuse,","method":"printed heading","endPage":7,"endAt":920,"startToken":459,"endToken":582},{"p":7,"at":920,"title":"A. In 1989, I graduated from Syracuse University with a Bachelor of Science in Electrical","method":"printed heading","endPage":8,"endAt":0,"startToken":582,"endToken":706},{"p":8,"at":0,"title":"Attachment I","method":"printed heading","endPage":8,"endAt":1549,"startToken":706,"endToken":927},{"p":8,"at":1549,"title":"A. Yes. I testified before the NYPSC in support of the electric rate proposals in the NMPC’s","method":"printed heading","endPage":9,"endAt":0,"startToken":927,"endToken":973},{"p":9,"at":0,"title":"Attachment I","method":"printed heading","endPage":9,"endAt":266,"startToken":973,"endToken":1015},{"p":9,"at":266,"title":"A. My name is Yan Flishenbaum. My business address is 4 Irving Place, New York, NY","method":"printed heading","endPage":10,"endAt":0,"startToken":1015,"endToken":1221},{"p":10,"at":0,"title":"Attachment I","method":"printed heading","endPage":10,"endAt":249,"startToken":1221,"endToken":1259},{"p":10,"at":249,"title":"A. Yes. I have filed testimony before the NYPSC and the New Jersey Board of Public","method":"printed heading","endPage":10,"endAt":412,"startToken":1259,"endToken":1286},{"p":10,"at":412,"title":"A. My name is Stacy Powers. My business address is 284 South Avenue, Poughkeepsie, New","method":"printed heading","endPage":11,"endAt":0,"startToken":1286,"endToken":1419},{"p":11,"at":0,"title":"Attachment I","method":"printed heading","endPage":11,"endAt":109,"startToken":1419,"endToken":1435},{"p":11,"at":109,"title":"A. Yes, I have filed testimony before the NYPSC.","method":"printed heading","endPage":11,"endAt":208,"startToken":1435,"endToken":1452},{"p":11,"at":208,"title":"A. We are testifying on behalf of Central Hudson, Con Edison, NYSEG, NMPC, Orange and","method":"printed heading","endPage":11,"endAt":554,"startToken":1452,"endToken":1502},{"p":11,"at":554,"title":"A. The purpose of our testimony is to support the Indicated NYTOs’ proposed revisions to","method":"printed heading","endPage":12,"endAt":0,"startToken":1502,"endToken":1697},{"p":12,"at":0,"title":"Attachment I","method":"printed heading","endPage":12,"endAt":365,"startToken":1697,"endToken":1752},{"p":12,"at":365,"title":"A. Yes. On behalf of the Indicated NYTOs,2 we are sponsoring the following exhibits, which","method":"printed heading","endPage":12,"endAt":608,"startToken":1752,"endToken":1793},{"p":12,"at":608,"title":"II. HISTORICAL BACKGROUND","method":"printed heading","endPage":12,"endAt":732,"startToken":1793,"endToken":1813},{"p":12,"at":732,"title":"A. The PSC adopted retail access programs in 1996. Under retail access, electric commodity","method":"printed heading","endPage":13,"endAt":0,"startToken":1813,"endToken":1978},{"p":13,"at":0,"title":"Attachment I","method":"printed heading","endPage":13,"endAt":470,"startToken":1978,"endToken":2056},{"p":13,"at":470,"title":"A. Since the NYISO was formed, Section 5 of the ISO OATT has referenced each","method":"printed heading","endPage":14,"endAt":0,"startToken":2056,"endToken":2208},{"p":14,"at":0,"title":"Attachment I","method":"printed heading","endPage":14,"endAt":33,"startToken":2208,"endToken":2214},{"p":14,"at":33,"title":"III. NYPSC BUNDLED DELIVERY RATES","method":"printed heading","endPage":14,"endAt":175,"startToken":2214,"endToken":2234},{"p":14,"at":175,"title":"A. Central Hudson, Con Edison, NYSEG, NMPC, O&R, and RG&E recover their","method":"printed heading","endPage":14,"endAt":1571,"startToken":2234,"endToken":2433},{"p":14,"at":1571,"title":"A. There is no stand-alone, transmission-only retail rate in New York that could be applied to","method":"printed heading","endPage":15,"endAt":0,"startToken":2433,"endToken":2476},{"p":15,"at":0,"title":"Attachment I","method":"printed heading","endPage":15,"endAt":323,"startToken":2476,"endToken":2524},{"p":15,"at":323,"title":"IV. THE NYPSC RATEMAKING PROCESS","method":"printed heading","endPage":15,"endAt":1432,"startToken":2524,"endToken":2691},{"p":15,"at":1432,"title":"A. The Staff of the Department of Public Service (“DPS Staff”) participates as a party in every","method":"printed heading","endPage":16,"endAt":0,"startToken":2691,"endToken":2744},{"p":16,"at":0,"title":"Attachment I","method":"printed heading","endPage":16,"endAt":334,"startToken":2744,"endToken":2791},{"p":16,"at":334,"title":"A. The parties conduct extensive discovery through information requests, and DPS Staff (and","method":"printed heading","endPage":16,"endAt":901,"startToken":2791,"endToken":2874},{"p":16,"at":901,"title":"A. No. Most rate cases are resolved through multi-party settlement negotiations that produce","method":"printed heading","endPage":16,"endAt":1461,"startToken":2874,"endToken":2955},{"p":16,"at":1461,"title":"A. The PSC does not simply accept a joint proposal because the parties have agreed to it. It","method":"printed heading","endPage":17,"endAt":0,"startToken":2955,"endToken":3026},{"p":17,"at":0,"title":"Attachment I","method":"printed heading","endPage":17,"endAt":382,"startToken":3026,"endToken":3087},{"p":17,"at":382,"title":"A. The PSC issues a final order adopting, modifying, or rejecting the joint proposal, or","method":"printed heading","endPage":17,"endAt":631,"startToken":3087,"endToken":3125},{"p":17,"at":631,"title":"A. Yes. The current rates of Central Hudson, Con Edison, NMPC, and O&R are based on","method":"printed heading","endPage":17,"endAt":1100,"startToken":3125,"endToken":3202},{"p":17,"at":1100,"title":"V. CURRENT RATES AND CHARGES","method":"printed heading","endPage":17,"endAt":1221,"startToken":3202,"endToken":3219},{"p":17,"at":1221,"title":"A. Yes. The service classifications available to transmission-voltage customers, including","method":"printed heading","endPage":18,"endAt":0,"startToken":3219,"endToken":3265},{"p":18,"at":0,"title":"Attachment I","method":"printed heading","endPage":18,"endAt":291,"startToken":3265,"endToken":3305},{"p":18,"at":291,"title":"A. Base delivery rates for these classes generally consist of a monthly customer charge plus a","method":"printed heading","endPage":18,"endAt":734,"startToken":3305,"endToken":3370},{"p":18,"at":734,"title":"A. No. Customers in a transmission-voltage service class pay more than transmission charges","method":"printed heading","endPage":18,"endAt":1244,"startToken":3370,"endToken":3438},{"p":18,"at":1244,"title":"A. Each Indicated Transmission Owner has several PSC-authorized surcharges that apply to","method":"printed heading","endPage":19,"endAt":0,"startToken":3438,"endToken":3506},{"p":19,"at":0,"title":"Attachment I","method":"printed heading","endPage":19,"endAt":105,"startToken":3506,"endToken":3524},{"p":19,"at":105,"title":"A. The components of the SBC related to cost recovery for the program budgets of the New","method":"printed heading","endPage":19,"endAt":836,"startToken":3524,"endToken":3638},{"p":19,"at":836,"title":"A. Pursuant to Section 14.1 of Attachment H, the wholesale Transmission Service Charge","method":"printed heading","endPage":19,"endAt":1332,"startToken":3638,"endToken":3713},{"p":19,"at":1332,"title":"VI. VOLTAGE DIFFERENTIATION OF PSC-APPROVED DELIVERY RATES","method":"printed heading","endPage":19,"endAt":1528,"startToken":3713,"endToken":3736},{"p":19,"at":1528,"title":"A. The following table lists, by utility, the various service classifications that will apply to","method":"printed heading","endPage":20,"endAt":0,"startToken":3736,"endToken":3763},{"p":20,"at":0,"title":"Attachment I","method":"printed heading","endPage":21,"endAt":0,"startToken":3763,"endToken":3940},{"p":21,"at":0,"title":"Attachment I","method":"printed heading","endPage":21,"endAt":122,"startToken":3940,"endToken":3960},{"p":21,"at":122,"title":"A. Yes.","method":"printed heading","endPage":21,"endAt":249,"startToken":3960,"endToken":3979},{"p":21,"at":249,"title":"A. Yes. For example, for NYSEG’s PSC service classification SC 7, Large General Service","method":"printed heading","endPage":21,"endAt":633,"startToken":3979,"endToken":4041},{"p":21,"at":633,"title":"A. Yes. For example, for NYSEG’s PSC service classification SC 7, Large General Service","method":"printed heading","endPage":21,"endAt":1155,"startToken":4041,"endToken":4128},{"p":21,"at":1155,"title":"A. Yes. A 100 MW Large Load with 73,000 MWh of energy consumption for a given month","method":"printed heading","endPage":22,"endAt":0,"startToken":4128,"endToken":4192},{"p":22,"at":0,"title":"Attachment I","method":"printed heading","endPage":22,"endAt":377,"startToken":4192,"endToken":4246},{"p":22,"at":377,"title":"A. Yes. NMPC electric rates have voltage differentiated delivery rates for all of its large","method":"printed heading","endPage":22,"endAt":1073,"startToken":4246,"endToken":4353},{"p":22,"at":1073,"title":"A. For a customer billed at standard SC3A rates, the customer would pay a much lower","method":"printed heading","endPage":23,"endAt":0,"startToken":4353,"endToken":4460},{"p":23,"at":0,"title":"Attachment I","method":"printed heading","endPage":23,"endAt":129,"startToken":4460,"endToken":4477},{"p":23,"at":129,"title":"A. Yes, but only to a limited extent. SC3A Transmission rates are primarily composed of","method":"printed heading","endPage":23,"endAt":935,"startToken":4477,"endToken":4594},{"p":23,"at":935,"title":"A. Yes. Similar to the example above but for a customer on the SC7 (parent SC3A) rate,","method":"printed heading","endPage":24,"endAt":0,"startToken":4594,"endToken":4625},{"p":24,"at":0,"title":"Attachment I","method":"printed heading","endPage":24,"endAt":94,"startToken":4625,"endToken":4639},{"p":24,"at":94,"title":"A. These hypothetical rate scenarios broadly illustrate the impact of voltage differentiation on","method":"printed heading","endPage":24,"endAt":528,"startToken":4639,"endToken":4700},{"p":24,"at":528,"title":"A. Yes, generally speaking. In accordance with applicable procedures for delivery service,","method":"printed heading","endPage":24,"endAt":1313,"startToken":4700,"endToken":4813},{"p":24,"at":1313,"title":"A. Under the PSC-approved rate classifications, standby and optional demand rates include","method":"printed heading","endPage":25,"endAt":0,"startToken":4813,"endToken":4885},{"p":25,"at":0,"title":"Attachment I","method":"printed heading","endPage":25,"endAt":209,"startToken":4885,"endToken":4920},{"p":25,"at":209,"title":"A. Yes. Any Large Load demand reduction would produce the same rate reduction benefit","method":"printed heading","endPage":25,"endAt":549,"startToken":4920,"endToken":4979},{"p":25,"at":549,"title":"A. Yes. NYSEG, as well as other Indicated NYTOs, offer Optional Demand Service/Standby","method":"printed heading","endPage":25,"endAt":1566,"startToken":4979,"endToken":5124},{"p":25,"at":1566,"title":"A. Yes. Consider an example in which a Large Load is curtailed by the NYISO or a utility to","method":"printed heading","endPage":26,"endAt":0,"startToken":5124,"endToken":5157},{"p":26,"at":0,"title":"Attachment I","method":"printed heading","endPage":26,"endAt":1150,"startToken":5157,"endToken":5361},{"p":26,"at":1150,"title":"A. Yes, the chart below provides the total delivery charges in a month for a large load customer","method":"printed heading","endPage":27,"endAt":0,"startToken":5361,"endToken":5471},{"p":27,"at":0,"title":"Attachment I","method":"printed heading","endPage":27,"endAt":96,"startToken":5471,"endToken":5485},{"p":27,"at":96,"title":"A. These hypothetical rate scenarios illustrate that there are lower charges potentially","method":"printed heading","endPage":27,"endAt":461,"startToken":5485,"endToken":5539},{"p":27,"at":461,"title":"A. In the case of settled rates, isolating the transmission component in the Indicated NYTOs’","method":"printed heading","endPage":28,"endAt":0,"startToken":5539,"endToken":5676},{"p":28,"at":0,"title":"Attachment I","method":"printed heading","endPage":28,"endAt":575,"startToken":5676,"endToken":5760},{"p":28,"at":575,"title":"A. It would likely disrupt their collection. Many state policy costs are collected through","method":"printed heading","endPage":29,"endAt":0,"startToken":5760,"endToken":5936},{"p":29,"at":0,"title":"Attachment I","method":"printed heading","endPage":29,"endAt":123,"startToken":5936,"endToken":5955},{"p":29,"at":123,"title":"A. Whether an unbundled transmission rate would displace a PSC delivery rate is an open","method":"printed heading","endPage":29,"endAt":850,"startToken":5955,"endToken":6064},{"p":29,"at":850,"title":"A. The revisions extend Section 5 to Eligible Customers serving Large Loads and reference","method":"printed heading","endPage":30,"endAt":0,"startToken":6064,"endToken":6211},{"p":30,"at":0,"title":"Attachment I","method":"printed heading","endPage":30,"endAt":118,"startToken":6211,"endToken":6231},{"p":30,"at":118,"title":"A. As reflected in the Revised Section 5.1.1, each retail access customer, including an Eligible","method":"printed heading","endPage":30,"endAt":1111,"startToken":6231,"endToken":6385},{"p":30,"at":1111,"title":"A. The revisions update each company-specific description in Section 5.2 to cite the current","method":"printed heading","endPage":31,"endAt":0,"startToken":6385,"endToken":6507},{"p":31,"at":0,"title":"Attachment I","method":"printed heading","endPage":31,"endAt":1011,"startToken":6507,"endToken":6664},{"p":31,"at":1011,"title":"VIII. THE NYISO’S COMPANION FILING","method":"printed heading","endPage":31,"endAt":1112,"startToken":6664,"endToken":6679},{"p":31,"at":1112,"title":"A. The NYISO’s filing proposes new Attachment LL to the ISO OATT, including, inter alia,","method":"printed heading","endPage":31,"endAt":1393,"startToken":6679,"endToken":6722},{"p":31,"at":1393,"title":"A. The two filings are complementary. The NYISO’s charges do not address the embedded","method":"printed heading","endPage":32,"endAt":0,"startToken":6722,"endToken":6775},{"p":32,"at":0,"title":"Attachment I","method":"printed heading","endPage":32,"endAt":429,"startToken":6775,"endToken":6838},{"p":32,"at":429,"title":"A. No. A Large Load that is using Non-Firm Withdrawal Service may be curtailed by the","method":"printed heading","endPage":32,"endAt":1291,"startToken":6838,"endToken":6972},{"p":32,"at":1291,"title":"A. Yes. The terms of the NYISO’s Non-Firm Withdrawal Service have been evolving until","method":"printed heading","endPage":33,"endAt":0,"startToken":6972,"endToken":7040},{"p":33,"at":0,"title":"Attachment I","method":"printed heading","endPage":33,"endAt":155,"startToken":7040,"endToken":7067},{"p":33,"at":155,"title":"IX. CONCLUSION","method":"printed heading","endPage":33,"endAt":212,"startToken":7067,"endToken":7075},{"p":33,"at":212,"title":"A. Yes.","method":"printed heading","endPage":96,"endAt":1146,"startToken":7075,"endToken":21237},{"p":96,"at":1146,"title":"Summary","method":"printed heading","endPage":134,"endAt":124,"startToken":21237,"endToken":26338},{"p":134,"at":124,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":134,"endAt":170,"startToken":26338,"endToken":26342},{"p":134,"at":170,"title":"I. SERVICE CLASSIFICATION NO. 2 - MRP","method":"printed heading","endPage":135,"endAt":129,"startToken":26342,"endToken":26610},{"p":135,"at":129,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":135,"endAt":175,"startToken":26610,"endToken":26614},{"p":135,"at":175,"title":"I. SERVICE CLASSIFICATION NO. 2 - MRP","method":"printed heading","endPage":136,"endAt":128,"startToken":26614,"endToken":26886},{"p":136,"at":128,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":136,"endAt":174,"startToken":26886,"endToken":26890},{"p":136,"at":174,"title":"I. SERVICE CLASSIFICATION NO. 2 - MRP","method":"printed heading","endPage":137,"endAt":125,"startToken":26890,"endToken":27144},{"p":137,"at":125,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":137,"endAt":171,"startToken":27144,"endToken":27148},{"p":137,"at":171,"title":"I. SERVICE CLASSIFICATION NO. 2 - MRP","method":"printed heading","endPage":138,"endAt":125,"startToken":27148,"endToken":27488},{"p":138,"at":125,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":138,"endAt":171,"startToken":27488,"endToken":27492},{"p":138,"at":171,"title":"I. SERVICE CLASSIFICATION NO. 2 - MRP","method":"printed heading","endPage":139,"endAt":126,"startToken":27492,"endToken":27790},{"p":139,"at":126,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":139,"endAt":172,"startToken":27790,"endToken":27794},{"p":139,"at":172,"title":"I. SERVICE CLASSIFICATION NO. 2 - MRP","method":"printed heading","endPage":140,"endAt":125,"startToken":27794,"endToken":28129},{"p":140,"at":125,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":140,"endAt":171,"startToken":28129,"endToken":28133},{"p":140,"at":171,"title":"I. SERVICE CLASSIFICATION NO. 2 - MRP","method":"printed heading","endPage":141,"endAt":125,"startToken":28133,"endToken":28313},{"p":141,"at":125,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":141,"endAt":171,"startToken":28313,"endToken":28317},{"p":141,"at":171,"title":"I. SERVICE CLASSIFICATION NO. 2 - MRP","method":"printed heading","endPage":142,"endAt":126,"startToken":28317,"endToken":28691},{"p":142,"at":126,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":142,"endAt":172,"startToken":28691,"endToken":28695},{"p":142,"at":172,"title":"I. SERVICE CLASSIFICATION NO. 2 - MRP","method":"printed heading","endPage":144,"endAt":122,"startToken":28695,"endToken":28913},{"p":144,"at":122,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":145,"endAt":122,"startToken":28913,"endToken":29341},{"p":145,"at":122,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":146,"endAt":122,"startToken":29341,"endToken":29570},{"p":146,"at":122,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":147,"endAt":122,"startToken":29570,"endToken":29922},{"p":147,"at":122,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":148,"endAt":122,"startToken":29922,"endToken":30218},{"p":148,"at":122,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":149,"endAt":122,"startToken":30218,"endToken":30690},{"p":149,"at":122,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":150,"endAt":122,"startToken":30690,"endToken":30899},{"p":150,"at":122,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":151,"endAt":122,"startToken":30899,"endToken":31190},{"p":151,"at":122,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":152,"endAt":122,"startToken":31190,"endToken":31481},{"p":152,"at":122,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":153,"endAt":126,"startToken":31481,"endToken":31748},{"p":153,"at":126,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":154,"endAt":122,"startToken":31748,"endToken":31937},{"p":154,"at":122,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":155,"endAt":122,"startToken":31937,"endToken":32112},{"p":155,"at":122,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":156,"endAt":122,"startToken":32112,"endToken":32327},{"p":156,"at":122,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":157,"endAt":122,"startToken":32327,"endToken":32626},{"p":157,"at":122,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":158,"endAt":122,"startToken":32626,"endToken":32934},{"p":158,"at":122,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":159,"endAt":122,"startToken":32934,"endToken":33449},{"p":159,"at":122,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":160,"endAt":122,"startToken":33449,"endToken":33842},{"p":160,"at":122,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":161,"endAt":122,"startToken":33842,"endToken":34127},{"p":161,"at":122,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":162,"endAt":122,"startToken":34127,"endToken":34540},{"p":162,"at":122,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":163,"endAt":122,"startToken":34540,"endToken":34805},{"p":163,"at":122,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":164,"endAt":122,"startToken":34805,"endToken":35247},{"p":164,"at":122,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":165,"endAt":126,"startToken":35247,"endToken":35633},{"p":165,"at":126,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":166,"endAt":126,"startToken":35633,"endToken":35660},{"p":166,"at":126,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":167,"endAt":124,"startToken":35660,"endToken":35687},{"p":167,"at":124,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":168,"endAt":125,"startToken":35687,"endToken":35714},{"p":168,"at":125,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":169,"endAt":125,"startToken":35714,"endToken":35741},{"p":169,"at":125,"title":"VIII. SERVICE CLASSIFICATIONS (continued):","method":"printed heading","endPage":176,"endAt":1234,"startToken":35741,"endToken":37358},{"p":176,"at":1234,"title":"A. Combined Metering and Billing: When the Company, pursuant to Rule 25.1.4.3, has provided Electric","method":"printed heading","endPage":176,"endAt":1651,"startToken":37358,"endToken":37425},{"p":176,"at":1651,"title":"B. Metering Voltage: When a customer provides the high voltage equipment to accept a service voltage higher","method":"printed heading","endPage":176,"endAt":2178,"startToken":37425,"endToken":37510},{"p":176,"at":2178,"title":"C. Riders: Service taken under this service classification may be eligible for a limited-duration bill reduction","method":"printed heading","endPage":176,"endAt":2365,"startToken":37510,"endToken":37535},{"p":176,"at":2365,"title":"D. RESERVED FOR FUTURE USE","method":"printed heading","endPage":177,"endAt":285,"startToken":37535,"endToken":37577},{"p":177,"at":285,"title":"E. On-Site Generation Special Provision - Customers are obligated to certify, subject to the Company’s","method":"printed heading","endPage":177,"endAt":783,"startToken":37577,"endToken":37655},{"p":177,"at":783,"title":"F. Retail Access: Customers served in this Rate Classification are eligible to participate in the Retail Access","method":"printed heading","endPage":177,"endAt":960,"startToken":37655,"endToken":37681},{"p":177,"at":960,"title":"G. For customers who operate a generator in excess of 25 MVa or greater and install automatic voltage control","method":"printed heading","endPage":177,"endAt":1665,"startToken":37681,"endToken":37792},{"p":177,"at":1665,"title":"H. Net Energy Billing for Certain Customers Operating Solar or Farm Waste Electric Generating","method":"printed heading","endPage":177,"endAt":2625,"startToken":37792,"endToken":37938},{"p":177,"at":2625,"title":"I. Net Energy Billing for Certain Customers Operating Solar or Farm Service Electric Generating","method":"printed heading","endPage":185,"endAt":2296,"startToken":37938,"endToken":41984},{"p":185,"at":2296,"title":"A. Company Facilities: Company shall not be required to provide facilities for SC-4 Supplemental Service,","method":"printed heading","endPage":185,"endAt":2617,"startToken":41984,"endToken":42030},{"p":185,"at":2617,"title":"B. Billing Period Adjustments: For a fractional part of a billing period at the beginning or end of service, the","method":"printed heading","endPage":185,"endAt":3030,"startToken":42030,"endToken":42097},{"p":185,"at":3030,"title":"C. Metering Voltage: When service is metered at a voltage either higher or lower than the voltage of","method":"printed heading","endPage":185,"endAt":3221,"startToken":42097,"endToken":42129},{"p":185,"at":3221,"title":"D. On-Site Generation Special Provision: Customers are obligated to certify, subject to the Company’s","method":"printed heading","endPage":186,"endAt":332,"startToken":42129,"endToken":42253},{"p":186,"at":332,"title":"E. Individually Negotiated Rates: The Company will entertain, when circumstances warrant and when NYPA consents","method":"printed heading","endPage":186,"endAt":692,"startToken":42253,"endToken":42304},{"p":186,"at":692,"title":"F. Exemption from Certain Provisions of Rate Schedule S.C. No. 3: Customers receiving SC-4 Supplemental Service","method":"printed heading","endPage":186,"endAt":994,"startToken":42304,"endToken":42357},{"p":186,"at":994,"title":"G. Special Rule for SC-4 Supplemental Service: SC-4 Supplemental Service, with the exception of supplemental","method":"printed heading","endPage":186,"endAt":1435,"startToken":42357,"endToken":42421},{"p":186,"at":1435,"title":"H. Special Rules for HLF Delivery Service","method":"printed heading","endPage":187,"endAt":923,"startToken":42421,"endToken":42902},{"p":187,"at":923,"title":"I. Special Rules for Niagara Power Delivery Service and Preservation Power Delivery Service","method":"printed heading","endPage":195,"endAt":1559,"startToken":42902,"endToken":45878},{"p":195,"at":1559,"title":"B. Separately Metered Accounts Not Served by OSG","method":"printed heading","endPage":195,"endAt":1920,"startToken":45878,"endToken":45929},{"p":195,"at":1920,"title":"C. Small Generators","method":"printed heading","endPage":195,"endAt":2105,"startToken":45929,"endToken":45956},{"p":195,"at":2105,"title":"D. Certain Customers Grandfathered Under Form Gf: Standby service rates shall not apply to","method":"printed heading","endPage":196,"endAt":375,"startToken":45956,"endToken":46161},{"p":196,"at":375,"title":"D. Certain Customers Grandfathered Under Form Gf: (Continued)","method":"printed heading","endPage":196,"endAt":1440,"startToken":46161,"endToken":46306},{"p":196,"at":1440,"title":"E. NYPA Programs and SC 12 Contracts","method":"printed heading","endPage":196,"endAt":1815,"startToken":46306,"endToken":46368},{"p":196,"at":1815,"title":"F. Environmentally Advantageous Technologies (“EAT”) Exemptions","method":"printed heading","endPage":198,"endAt":372,"startToken":46368,"endToken":46840},{"p":198,"at":372,"title":"F. Environmentally Advantageous Technologies (“EAT”) Exemptions (Continued)","method":"printed heading","endPage":199,"endAt":332,"startToken":46840,"endToken":47408},{"p":199,"at":332,"title":"F. Environmentally Advantageous Technologies (“EAT”) Exemptions (Continued)","method":"printed heading","endPage":199,"endAt":1018,"startToken":47408,"endToken":47512},{"p":199,"at":1018,"title":"G. Net Metering for Solar, Farm Waste, Wind, Micro-Combined Heat and Power, Micro-Hydroelectric","method":"printed heading","endPage":200,"endAt":284,"startToken":47512,"endToken":47610},{"p":200,"at":284,"title":"H. Emergency Generators","method":"printed heading","endPage":200,"endAt":2888,"startToken":47610,"endToken":48027},{"p":200,"at":2888,"title":"I. Customers served on SC-2D with a contract demand less than 50 kW may elect to remain on the SC-2D","method":"printed heading","endPage":213,"endAt":393,"startToken":48027,"endToken":51839},{"p":213,"at":393,"title":"A. Interval Metering: All Standby Service Customers and Optional Rate Customers shall utilize the","method":"printed heading","endPage":213,"endAt":1866,"startToken":51839,"endToken":52052},{"p":213,"at":1866,"title":"B. Telecommunications: Remote meter reading capability is also required for all Standby Service Customers","method":"printed heading","endPage":213,"endAt":2702,"startToken":52052,"endToken":52172},{"p":213,"at":2702,"title":"C. Customer-Provided Equipment: Customers providing a telephone connection to the meter will bear all costs","method":"printed heading","endPage":213,"endAt":3389,"startToken":52172,"endToken":52277},{"p":213,"at":3389,"title":"D. Company-Provided Equipment: Customers who choose the Company-provided meter reading","method":"printed heading","endPage":214,"endAt":406,"startToken":52277,"endToken":52371},{"p":214,"at":406,"title":"E. Exceptions for Customers Smaller Than 50 kW: In addition, customers who would otherwise receive","method":"printed heading","endPage":214,"endAt":895,"startToken":52371,"endToken":52451},{"p":214,"at":895,"title":"A. Contract Demands Larger than 1000 kW: All Standby Service Customers with Contract Demands","method":"printed heading","endPage":214,"endAt":1791,"startToken":52451,"endToken":52590},{"p":214,"at":1791,"title":"B. SC-4 Customers: Customers who would otherwise receive service under the provisions of Service","method":"printed heading","endPage":214,"endAt":2021,"startToken":52590,"endToken":52624},{"p":214,"at":2021,"title":"C. Compliance with Reliability Criteria: Standby Service Customers agree to comply with any existing or","method":"printed heading","endPage":214,"endAt":2367,"startToken":52624,"endToken":52668},{"p":214,"at":2367,"title":"D. Electrically Isolated Loads: In the event that any customer elects to Electrically Isolate (as defined in Rule","method":"printed heading","endPage":215,"endAt":1095,"startToken":52668,"endToken":52924},{"p":215,"at":1095,"title":"E. Penalties for Reconnecting Isolated Loads without Notice: Notwithstanding any other provision of this","method":"printed heading","endPage":216,"endAt":352,"startToken":52924,"endToken":53143},{"p":216,"at":352,"title":"F. Reduced Customer Charge for Certain Wholesale Generators","method":"printed heading","endPage":217,"endAt":358,"startToken":53143,"endToken":53343},{"p":217,"at":358,"title":"G. Billing for Customers With OSG’s Less Than or Equal to 15% of Maximum Potential Demand:","method":"printed heading","endPage":218,"endAt":361,"startToken":53343,"endToken":53463},{"p":218,"at":361,"title":"H. Waiver of Reactive Demand Charges for Wholesale Generators Larger Than 25 MVA and With","method":"printed heading","endPage":384,"endAt":469,"startToken":53463,"endToken":82709},{"p":384,"at":469,"title":"A. Reserved for Future Use","method":"printed heading","endPage":451,"endAt":1988,"startToken":82709,"endToken":98530}]}
