{"document":{"slug":"rec-20261116-5337","title":"Horizon West Transmission - Response to Show Cause Order EL26-71-","issued":"2026-11-16","accession":"20261116-5337","docket":"ER27-530-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Horizon West Transmission, LLC","kind":"tariff filing","file":"sources/filings/text/20261116-5337_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5337","tier":"record","sha256":"85d45a1e0ee32c6d39d63a7c37410c2460834bf8007c1523c1b5caeced266fc7","pages":24,"tokens":10938,"emptyPages":[],"textThemes":["study","cost","colo","flex"]},"pages":[{"page":1,"startToken":0,"endToken":361,"text":"2000 Pennsylvania Avenue NW \nSuite 6000 \nWashington, DC 20006 \n202-298-1800 \n \nMeghan O’Brien \n202-298-1800 \nmobrien@vnf.com \n \n \nNovember 16, 2026 \n \nVIA E-TARIFF FILING \n \nDebbie-Anne A. Reese \nSecretary \nFederal Energy Regulatory Commission \n888 First Street, NE  \nWashington, DC 20426 \n \n \nRe: \nHorizon West Transmission, LLC \n \n \nDocket Nos. ER27-___-000 and EL26-71-000 \n \n \nResponse to Show Cause Order \n \nDear Secretary Reese: \n \n \nPursuant to section 205 of the Federal Power Act (“FPA”),1 Part 35 of the Federal Energy \nRegulatory Commission’s (the “Commission”) regulations and Rules 209 and 213 of the \nCommission’s Rules of Practice and Procedure,2 Horizon West Transmission, LLC (“Horizon \nWest”) respectfully submits this response to the Commission’s Show Cause Order issued \npursuant to section 206 of the FPA on June 18, 2026, in Docket No. EL26-71-000 directing the \nCalifornia Independent System Operator Corporation (“CAISO”) and Participating Transmission \nOwners (“PTOs”) in CAISO to show cause why their tariffs are just and reasonable and not \nunduly discriminatory or preferential, or in the alternative to explain the necessary changes to \nremedy the Commission’s identified concerns.3  In the Show Cause Order, the Commission also \nencouraged a response in the form of a section 205 filing proposing tariff revisions remedying \nthe concerns identified in the Show Cause Order.4  \n \nIn the instant filing, Horizon West proposes revisions to its Transmission Owner Tariff \n(“Horizon West Tariff”)5 and supporting explanations in response to the Show Cause Order to \n \n1  \n16 U.S.C. § 824d. \n2  \n18 C.F.R. §§ 385.209, 385.213(a). \n3  \nCal. Indep. Sys. Operator Corp., 195 FERC ¶ 61,214, at P 3 (2026) (“Show Cause Order”). \n4  \nId. at P 34. \n5  \nThe Horizon West Tariff has been accepted by the Commission.  NextEra Energy Transmission W., LLC, 154 \nFERC ¶ 61,009 (2016); NextEra Energy Transmission W., LLC, 155 FERC ¶ 61,258 (2016); NextEra Energy \nTransmission W., LLC, Docket No. ER15-2239-005 (Oct. 28, 2016) (delegated letter order); NextEra Energy \nTransmission W., LLC, Docket No. ER15-2239-006 (Apr. 5, 2017) (delegated letter order); NextEra Energy \nTransmission W., LLC, Docket No. ER15-2239-007 (Apr. 5, 2017) (delegated letter order); Horizon W. \nTransmission, LLC, Docket Nos. ER20-2874-000 and ER20-2874-001 (Dec. 23, 2020) (delegated letter order \naccepting re-baselined TO Tariff)."},{"page":2,"startToken":361,"endToken":856,"text":"2 \nremedy the concerns identified therein.  Horizon West’s proposed tariff revisions are just and \nreasonable and not unduly discriminatory or preferential, and resolve the Commission’s \napplicable preliminary findings in the Show Cause Order.  Horizon West also explains how \ncertain aspects of the Show Cause Order are not applicable to Horizon West due to its role as a \nNon-Load-Serving Entity PTO (“Non-LSE PTO”).6  Thus, Horizon West requests that the show \ncause proceeding be terminated with respect to Horizon West.  \nFurther, Horizon West respectfully requests a 30-day comment period on this filing.  \nHorizon West also respectfully requests that the Commission accept the amendments proposed \nherein effective February 16, 2027. The requested dates align with those requested by CAISO.  \nI. \nBACKGROUND  \nA. Horizon West \n \nHorizon West is a Non-LSE PTO in the CAISO region.  Horizon West is a public utility \nand wholly owned direct subsidiary of NextEra Energy Transmission, LLC, formed in 2014 to \ndevelop, construct, finance, own, operate, and maintain electric transmission facilities in the \nCAISO region.  Horizon West currently owns and operates the 230 kV +300/100 MVAr Suncrest \nReactive Power Project, which is designed to accommodate reactive power for high-voltage \ntransmission.  The Estrella Substation Project, a new 230/70/12 kV substation, new 230/70 kV \ntransformers, and reconductoring and looping at the existing transmission line are still under \ndevelopment.  More recently, Horizon West was selected by CAISO to fund, develop, construct, \nown, and operate: (1) the North Gila—Imperial Valley #2 500 kV Line Project, a new, roughly \n80-mile 500 kV transmission line spanning a portion of Yuma County, Arizona and southern \nImperial County designed to improve access to renewable resources for customers in Southern \nCalifornia; and (2) the proposed Imperial Valley—North of San Onofre Nuclear Generating \nStation 500 kV Line and 500/230 kV Substation Project, consisting of a 140-mile 500 kV \ntransmission line and related substation, which was identified as necessary to meet the future \nneeds of the region’s electric grid.  Horizon West recovers its transmission revenue requirement \n(“TRR”) through a Commission-approved formula rate under the Horizon West Tariff, which is \ninvoiced and collected through the CAISO Access Charge rates under Section 26 of the CAISO \nOpen Access Transmission Tariff (“CAISO Tariff”).  As a Non-LSE PTO under the CAISO Tariff \nand Transmission Control Agreement,7 Horizon West serves no retail load.8 \nB. Show Cause Order \n \nOn June 18, 2026, the Commission initiated a show cause proceeding against CAISO and \nthe PTOs pursuant to section 206 of the FPA.  The Show Cause Order directed CAISO and the \nPTOs to explain why the CAISO Tariff and the Transmission Owner Tariffs of the PTOs (“PTO \n \n6  \nCAISO Tariff, App. A (defining Non-Load-Serving Participating TO).   \n7  \nCAISO Rate Schedules, Amended and Restated Transmission Control Agreement.   \n8  \nHorizon West Tariff § 1 (stating that Horizon West is a Non-LSE PTO and does not provide retail electric \nservice to End-Use Customers); id. § 3 (definition of “Non-Load-Serving Participating TO”); see also CAISO Tariff, \nApp. A (Non-LSE PTO)."},{"page":3,"startToken":856,"endToken":1316,"text":"3 \nTariffs”) remain just and reasonable and not unduly discriminatory or preferential without certain \ntariff provisions addressing:9  \n \na) the application process, study procedures, and ongoing operational requirements that \napply to Eligible Customers10 seeking transmission service on behalf of Large Loads; \nb) additional transparency concerning the network upgrade11 costs to provide transmission \nservice to Eligible Customers on behalf of Large Loads; and a pro forma cost recovery \nagreement between CAISO, the relevant transmission owner, and the Eligible Customer \ntaking transmission service on behalf of the Large Load to mitigate the risk of cost \nshifting among transmission customers, and a mechanism to ensure such payments are \nappropriately credited toward transmission owners’ TRRs consistent with the \nCommission’s cost-of-service regulations; \nc) the rates, terms, and conditions of service that apply to co-location arrangements; \nd) transmission services that reflect Eligible Customers taking transmission service on \nbehalf of co-located loads, load with behind the meter generation, and flexible Large \nLoads that are willing and able to limit their use of the transmission system under certain \nconditions;12 and \ne) the rates, terms, and conditions of service applicable to interconnection customers serving \nelectrically proximate Large Load or co-located load. \n \nAlternatively, respondents may explain what changes to their tariffs would remedy the identified \nconcerns if the Commission were to determine that the tariffs have in fact become unjust and \nunreasonable or unduly discriminatory or preferential and proceeds to establish a replacement \ntariff.13 \nC. Motion for Abeyance \n \nOn August 3, 2026, pursuant to Rule 212 of the Commission’s Rules of Practice and \nProcedure, CAISO and the joint PTOs, which included Horizon West, each filed motions to hold \nthe above-referenced show cause proceeding in abeyance for 90 days, pending completion of \nCAISO’s stakeholder proceedings and development of the companies’ respective FPA section \n205 filings to address the Commission’s preliminary findings in the Show Cause Order \n \n9  \nShow Cause Order at P 31. \n10  Horizon West Tariff § 3.24 (definition of “Eligible Customer”). \n11  The Show Cause Order uses the term network upgrades throughout the order to refer to modifications or \nadditions to transmission-related facilities that are integrated with and support the overall transmission system.  See \nShow Cause Order at P 3 n.13 (citing pro forma OATT § 1.27 (Definitions – Network Upgrades)).  CAISO’s current \ndefinition of Network Upgrades applies only to additions, modifications, and upgrades required to accommodate the \nInterconnection of generating facilities.  Id. (citing CAISO Tariff, App. A (Definitions), Network Upgrades (0.0.0)). \n12  For purposes of the Show Cause Order, “flexible” Large Loads are a subset of Large Loads that are not co-\nlocated with generation but are willing and able to limit their energy withdrawals from the transmission system \nunder certain conditions.  See id. at P 3 n.14. \n13  Id. at P 3."},{"page":4,"startToken":1316,"endToken":1805,"text":"4 \n(“Abeyance Motions”).14  The Commission granted the Abeyance Motions and held this \nproceeding in abeyance, in full, including responses to the Show Cause Order and briefing \nquestions, for 90 days.15  \nII. \nHORIZON WEST’S PROPOSED TRANSMISSION OWNER TARIFF \nREVISIONS \n \nThe proposed Horizon West Tariff revisions are just and reasonable and not unduly \ndiscriminatory or preferential.  The proposed revisions establish an application process, study \nprocedures, operational requirements, and creditworthiness and financial security requirements \napplicable to requests by Eligible Customers seeking to interconnect a Large Load to the Horizon \nWest transmission system.  The revisions are designed to consistently evaluate the reliability, \noperational, and planning impacts of proposed Large Loads, identify and allocate responsibility \nfor any Direct Assignment Facilities, Reliability Upgrades, and other Network Upgrades, and \nmitigate the risk of cost shifting associated with the Interconnection and service of Large Loads.  \nThe proposed revisions provide transparency and certainty regarding the information, studies, \nagreements, and credit and financial security commitments required from Eligible Customers \nseeking transmission service on behalf of Large Loads.16  The proposed amendments to the \nHorizon West Tariff fall into the following categories: \n(1) \nNew and revised defined terms in Section 3 of its Horizon West Tariff, including \ndefinitions of Large Load, Flexible Interim Load Interconnection (“FILI”) \nService, Interconnection Facilities, Point of Interconnection, Network Upgrades, \nSite Control, Gross Load, Transmission Revenue Requirement, and Reliability \nUpgrade; \n(2) \nRevisions to Section 5 of its Horizon West Tariff to clarify Gross Load reporting \nassociated with Large Load consistent with the CAISO Tariff; \n(3) \nRevisions to Sections 8.1 and 10.1 through 10.20 of its Horizon West Tariff to \nestablish an interconnection application process, readiness requirements, and \nstudy procedures specific to Large Load interconnections; \n(4) \nRevisions to Sections 8.1.5.1, 10.3, 10.12, 10.17, and 16.12 of its Horizon West \nTariff to establish operational and reliability requirements for Large Loads; \n(5) \nAdditions to Section 10.18 of the Horizon West Tariff to establish rates, terms, \nand conditions of service applicable to co-located Large Load and FILI Service; \n(6) \nInclusion of cost recovery, creditworthiness, and financial security provisions in \nSections 10.11.2, 10.17.2, and 13.2.1, and including a pro forma Cost Recovery \nAgreement as a new Attachment A to the Horizon West Tariff for the purpose of \n \n14  Cal. Indep. Sys. Operator Corp., Motion for Abeyance of the California Independent System Operator \nCorporation, Docket No. EL26-71-000 (Aug. 3, 2026); Cal. Indep. Sys. Operator Corp., Request for Abeyance of \nSouthern California Edison Company et al., Docket No. EL26-71-000 (Aug. 3, 2026). \n15  Cal. Indep. Sys. Operator Corp., 196 FERC ¶ 61,131, at P 13 (2026). \n16  Horizon West developed the proposed revisions herein in a good-faith effort to align with CAISO’s proposed \ntariff revisions, and to the extent practicable given the parallel development of the PTOs’ filings and Horizon West’s \nstatus as a Non-LSE PTO, with the approaches of the other CAISO PTOs."},{"page":5,"startToken":1805,"endToken":2313,"text":"5 \nprotecting against cost shifting and increasing transparency as to the Network \nUpgrade costs for Large Load interconnection; and \n(7) \nAdoption of transition provisions in Section 10.20 to protect existing and ongoing \ncommercial arrangements for Large Loads that are operational or have a \nCompleted Interconnection Application before February 16, 2027. \nHorizon West’s proposed revisions are tailored to its status as a Non-LSE PTO, are \ncoordinated with and consistent with proposed CAISO Tariff revisions and satisfy the Show \nCause Order requirements applicable to a Non-LSE PTO.  Horizon West has also incorporated \ncertain conforming and ministerial revisions, such as correcting punctuation and applying \nconsistent usage of terms.  Accordingly, Horizon West respectfully submits that the proposed \ntariff revisions are just and reasonable, not unduly discriminatory or preferential, and should be \naccepted by the Commission under section 205 of the FPA, effective as requested.  Horizon West \nfurther requests that the Commission terminate the show cause proceeding with respect to \nHorizon West upon acceptance of the proposed tariff revisions. \nA. Large Load Interconnection Process \nIn the Show Cause Order, the Commission made a preliminary finding that the CAISO \nTariff and PTO Tariffs appear to be unjust and unreasonable because they lack clear and \nconsistent provisions with respect to the application and study process for Eligible Customers \nseeking transmission and interconnection service on behalf of Large Loads.17  The Horizon West \nTariff establishes, in Sections 8.1 and 10, a defined and time-limited interconnection process for \nLarge Loads with specific application, readiness, study, and operational requirements, and it \nclarifies how a Large Load interconnected to Horizon West’s facilities obtains transmission \nservice over the CAISO Controlled Grid.  Elements of this proposal include the following tariff \nimprovements for the integration of Large Loads. \n1. \nDefinition of Large Load   \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff and PTO Tariffs appear to be unjust and unreasonable because they \nlack a definition of Large Load sufficient to capture loads that present the unique challenges \ndescribed in the Show Cause Order.18 \nHorizon West Solution:  In response to the Commission’s finding, Horizon West \nproposes to define a Large Load as “[a]n End-User located at a single site behind one or more \nPoints of Interconnection to the CAISO Controlled Grid, and that has a peak load of 50 MW or \ngreater.”19 This definition is identical to the definition CAISO proposes to add to Appendix A of \nthe CAISO Tariff, and adopts the 50 MW threshold the Commission identified as reasonable.20  \n \n17  Show Cause Order at PP 38, 49, 58.  Citations herein to the “Horizon West Tariff” refer to the revised Horizon \nWest TO Tariff included as Appendices A and B to this filing.  Citations to the “CAISO Proposed Tariff” refer to the \ntariff revisions CAISO is submitting contemporaneously in response to the Show Cause Order. \n18  Id. at PP 56, 57. \n19  Horizon West Tariff § 3.46 (definition of “Large Load”). \n20  CAISO Proposed Tariff, App. A (definition of “Large Load”); Show Cause Order at P 57."},{"page":6,"startToken":2313,"endToken":2865,"text":"6 \nHorizon West has also adopted CAISO’s approach of not excluding co-located loads from the \ndefinition of Large Load to ensure alignment between the two tariffs. \n2. \nApplication and Study Procedures \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff and PTO Tariffs appear to be unjust and unreasonable because they \nlack clear and consistent provisions addressing the application process and study procedures for \nEligible Customers to request transmission service on behalf of Large Loads.21  The Commission \nindicated that such processes should clarify that applications be accepted on a rolling basis; \nrequire a non-refundable application fee as well as staged readiness requirements; and specify \nthe information and data requirements to be submitted with an application.22 \nHorizon West Solution:  The proposed tariff revisions leverage Horizon West’s existing \napplication and study processes while identifying the additional procedures applicable to Large \nLoads due to their unique operational requirements and reliability impacts on the transmission \nsystem.  Horizon West submits that this approach promotes transparency and administrative \nefficiency by providing a single, integrated framework for Large Load interconnection requests \nunder the Horizon West Tariff.  This is responsive to the Show Cause Order’s concern regarding \nthe lack of specificity for Large Loads and their unique operational characteristics and \nrequirements. \nHorizon West’s proposed tariff revisions establish the applicable provisions for Eligible \nCustomers requesting service on behalf of Large Loads (as defined in the Horizon West Tariff).  \nFirst, revised Section 8.1 explicitly extends Horizon West’s obligation to interconnect to entities \neligible to request interconnection to pursuant to FPA section 210(a) and Eligible Customers, \nincluding Large Loads owned or served by a third party.  Because Horizon West is a Non-LSE \nPTO with no retail customers, a Large Load connecting directly to Horizon West’s facilities may \nnot qualify as an “Eligible Customer” in certain instances.  Horizon West therefore proposes, in \nnew Section 10.2, a voluntary offer of unbundled retail transmission service, where consistent \nwith state law, so that Large Loads can request Interconnection and be studied under the Horizon \nWest Tariff as the Show Cause Order contemplates.23 Second, revised Section 10.1 requires that \na Large Load Interconnection be requested pursuant to Section 10 of the Horizon West Tariff and \ncomply with Section 25.7 of the CAISO Tariff.24  Horizon West affirms that under the Horizon \nWest Tariff, applications are accepted on a rolling basis, and revised Section 10.4 requires \nHorizon West to timestamp each Large Load Interconnection Application to establish study \npriority on a rolling basis.  \n \n21  Show Cause Order at PP 56, 58. \n22  Id. at P 58. \n23  Id. at P 38 & n.117; see also id. at P 43 & n.123. See Horizon West Tariff § 3.24 (definition of “Eligible \nCustomer”), id. § 10.2.  The offer covers only Interconnection and associated access to the CAISO Controlled Grid \nconsistent with the CAISO Tariff.  It does not include the sale of Energy, distribution service, or scheduling or \nsettlement in the CAISO Markets, and it is available on a non-discriminatory basis to all End-Use Customers on \nHorizon West’s facilities, not only Large Loads. \n24  Horizon West Tariff §§ 8.1, 10.1; CAISO Proposed Tariff § 25.7 (providing that “End Users, including Large \nLoads, interconnect to the CAISO Controlled Grid pursuant to PTO and retail tariffs”)."},{"page":7,"startToken":2865,"endToken":3449,"text":"7 \n \nConsistent with the Commission’s concern that the tariffs specify which entity is \nresponsible for the study, Horizon West is proposing revisions to Sections 10.1 and 10.4 to \nclarify that the Eligible Customer is the entity that requests Interconnection on behalf of a Large \nLoad.25 Horizon West, as the interconnecting PTO, will perform the System Impact Study and \nFacilities Study for the Eligible Customer taking transmission service on behalf of a Large Load \npursuant to Section 10.26  As part of its study obligations, Horizon West will apprise CAISO of \nLarge Load interconnections through its inputs to the Base Case, Interconnection Studies, and the \nTransmission Planning Process.27  Prior to energization of any Large Load, Horizon West must \nprovide CAISO the information required by Section 25.7.1 of the CAISO Tariff, and the Eligible \nCustomer must provide that information to Horizon West and notify Horizon West of any \nmaterial changes within 10 Business Days.28  \nFurthermore, Horizon West proposes new Section 10.5.1 to clarify additional application \nrequirements for Large Load interconnections.  Specifically, an Eligible Customer seeking to \ninterconnect a Large Load must submit: (i) the Large Load’s ramp schedule, identifying load \nadditions over time and maximum planned load; (ii) a site plan; (iii) documentation of the local, \nstate, and federal permits and regulatory approvals necessary to develop the Large Load; (iv) \ndocumentation demonstrating Site Control; (v) a single-line electrical diagram; (vi) information \non any other Interconnection requests made on behalf of the same Large Load or its affiliates; \n(vii) whether the Large Load intends to request Partial Interim Service or FILI Service; and (viii) \nfor a Large Load co-located with a Generating Facility, information sufficient for Horizon West \nto ensure compliance with Sections 25.1.1, 25.7.5, and 25.7.6 of the CAISO Tariff.  Because \nSection 10.3 requires every Interconnection Application to be copied to CAISO, Section \n10.5.1(vi) requires disclosure of other pending requests on behalf of the same Large Load to \nCAISO, as the Commission contemplated.29  Horizon West and CAISO, as applicable, must \ndetermine whether an application is complete within ten (10) Business Days under Section 10.6. \nAn applicant must pay a $5,000 nonrefundable Large Load Interconnection Application \nfee.30  At the time of application, they must provide site plans, demonstration of Site Control \n(which is newly defined to ensure control of the site), and receipt of necessary permits.31  These \nrequirements will ensure that interconnection applications are real, concrete, and nonspeculative.  \nFurthermore, Horizon West proposes that, at the Large Load System Impact Study phase, the \nEligible Customer must provide a refundable study deposit of: (a) $35,000 plus $1,000 per MW \n \n25  Horizon West notes that there are circumstances in which the Large Load could itself be the Eligible Customer, \nin which case the Large Load would be requesting interconnection on its own behalf.   \n26  Horizon West Tariff §§ 10.12, 10.16; Show Cause Order at PP 38 & n.117, 39 & n.118, 51. \n27  Horizon West Tariff § 10.3. \n28  Id. §§ 8.1.5(v), 10.3. \n29  Show Cause Order at P 58. \n30  Horizon West Tariff § 10.5; see also CAISO Tariff, App. KK § 3.5.1.1 (Interconnection Study Deposit). \n31  A site subject to a development moratorium or other governmental restriction that prohibits the proposed use \ndoes not satisfy the Site Control requirement unless the restriction has been lifted or the applicant has obtained all \nnecessary approvals, exemptions, or variances."},{"page":8,"startToken":3449,"endToken":3958,"text":"8 \nfor Interconnection Requests less than 80 MW; (b) $150,000 for Interconnection Requests \ngreater than or equal to 80 MW but less than 200 MW; or (c) $250,000 for Interconnection \nRequests greater than 200 MW.32 The refundable study deposit amounts are consistent with those \nrequired in CAISO’s generator interconnection process.  At the Facilities Study phase, the \nEligible Customer must pay the estimated cost of the Facilities Study, and, before energization, \namongst other requirements, it must execute the Interconnection Agreement and pro forma Cost \nRecovery Agreement, and post all required financial security (Sections 10.17.2, 8.1.5.1(viii), and \n13.2.1).  These readiness requirements thus escalate at distinct phases throughout the study \nprocess, consistent with the Show Cause Order directives.33  An applicant that withdraws from \nthe process at any phase must reimburse Horizon West for all costs reasonably incurred and may \nbe responsible for the cost of restudying later-queued applicants.  \nFor a Large Load Interconnection, the System Impact Study must evaluate the Large \nLoad’s operational characteristics, including its ramp schedule, its performance during system \ndisturbances, and any ability to limit its withdrawals from the CAISO Controlled Grid, consistent \nwith Section 25.7.1 of the CAISO Tariff.  The PTO will evaluate impacts to the transmission \nsystem using power flow and short circuit analyses, and any other analyses that may be \nappropriate including Electromagnetic Transient studies where warranted.  The completed \nSystem Impact Study will include a non-binding, good-faith estimate of the cost of Direct \nAssignment Facilities and Network Upgrades needed to accommodate the request and the time \nrequired to construct them, which the Facilities Study then refines.  Horizon West may request \nadditional information, data, or models reasonably needed for the study, including models \nsuitable for Electromagnetic Transient studies.  The request then proceeds through Horizon \nWest’s existing Facilities Study procedures, which refine the facilities design and the cost and \nschedule estimates for incorporation into the Interconnection Agreement. \n3. \nOperational and Reliability Requirements  \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff and PTO Tariffs appear to be unjust and unreasonable because they \nlack appropriate provisions regarding the ongoing operational requirements that will apply to \ntransmission customers serving Large Loads.34  The Commission further highlighted the lack of \ndetail on data available to CAISO regarding interconnected Large Loads for monitoring and \nreliability purposes, the lack of language enabling CAISO to remotely disconnect Large Loads \nvia installed equipment, the absence of specified ramp rate, ride-through, and control \ntechnologies or protection systems required.35  \nHorizon West Solution:  It is Horizon West’s understanding that CAISO is proposing \nchanges to Section 25.7.1 of the CAISO Tariff to provide substantial additional clarity regarding \nongoing operational requirements for Eligible Customers serving Large Loads, including \nFrequency Ride-Through, Voltage Ride-Through, Post-Fault Active Power Recovery, and Ramp-\n \n32  Horizon West Tariff § 10.11.2; see also CAISO Tariff, App. KK § 3.5.1.1. \n33  Show Cause Order at PP 55, 58. \n34  Id. at PP 56, 59, 63. \n35  Id. at P 63."},{"page":9,"startToken":3958,"endToken":4415,"text":"9 \nRate Limitation requirements.  Accordingly, Horizon West’s proposed Section 10.17 specifies \nthat any Large Load Interconnection Agreement will require compliance with Section 25.7.1 of \nthe CAISO Tariff, and proposed Section 10.3 requires Horizon West to provide the information \nrequired by Section 25.7.1 to CAISO prior to energization of the Large Load.  This approach will \nensure that Large Load operational requirements remain current with CAISO standards and \nprovide transparency and regularity of operational standards that will support reliable operation \nof the overall grid.   \nHorizon West also proposes a series of additional operational requirements mirroring \nCAISO Tariff measures, specifically:  \n• Following proposed CAISO Tariff Section 25.7.4 by requiring the Eligible \nCustomer, Large Load, Scheduling Coordinator, and Horizon West to comply with \nany CAISO, Regional Entity, or Reliability Coordinator data request after a \ndisturbance or other reliability event involving a Large Load (Section 16.12); \n• Ensuring visibility into Large Load operations by extending proposed CAISO \nTariff Section 25.7.3 requirements for the Scheduling Coordinator for each Large \nLoad to provide daily and hourly forecasts, material real-time deviations, outage \ninformation, and real-time telemetry (Sections 8.1.5.1(iii) and 10.17); meet all \nfrequency ride-through requirements, voltage ride through requirements, post-\nfault active power recovery requirements, and ramp rate limitations; \n• Following proposed CAISO Tariff Sections 25.7.1.1, 25.7.1.2, 25.7.1.3, and \n25.7.1.4, by requiring Large Load to meet all frequency ride-through \nrequirements, voltage ride through requirements, post-fault active power recovery \nrequirements, and ramp rate limitations established therein (Section 8.1.5.1(x)). \nFinally, Horizon West proposes requirements for installation and maintenance of the \nequipment required to disconnect or otherwise isolate the Large Load (Sections 8.1.5.1(vi) and \n10.17), with those costs directly assigned to the applicant to avoid cost shifting to transmission \ncustomers (Section 8.1.2). \n4. \nAlternative Transmission Technologies   \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff and PTO Tariffs appear to be unjust and unreasonable because they \nlack clear and consistent provisions requiring the evaluation of alternative transmission \ntechnologies as potential solutions to an Eligible Customer’s request for service on behalf of a \nLarge Load,36 or requiring an explanation to the Eligible Customer why alternative transmission \ntechnologies are not feasible or would not result in lower costs or a faster timeline \naccommodating the request.37  \nHorizon West Solution:  The proposed revisions to Section 10.12.1 commit Horizon \nWest to considering alternative transmission technologies in the System Impact Study for every \nLarge Load Interconnection Application, without the need for a request from the Eligible \n \n36  Id. at P 60. \n37  Id. at P 61."},{"page":10,"startToken":4415,"endToken":4931,"text":"10 \nCustomer.  If Horizon West selects traditional Network Upgrades instead, it must demonstrate \nwhy alternative transmission technologies are not feasible or would not result in lower costs or a \nfaster timeline for accommodating the request.38  This provision is consistent with the proposed \nrevision to CAISO Tariff Section 24.1, which extends CAISO’s consideration of alternative \ntransmission technologies to Large Loads and contemplates the inclusion of similar language in \nthe PTO Tariffs. \n5. \nStudy Process Timeline \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the study processes could culminate in a report to the Eligible Customer describing \nthe Network Upgrades necessary to accommodate the service request as well as a non-binding \ngood-faith estimate of the cost and the time to construct such facilities, which should take no \nmore than 60-90 days calendar days to complete.39  \nHorizon West Solution:  Horizon West proposes the adoption of revised Section 10.12 \nand 10.12.1 to its tariff requiring that a System Impact Study for a Large Load provide a non-\nbinding, good-faith estimate of the cost of Direct Assignment Facilities and Network Upgrades \nneeded to accommodate the request and a similar good-faith time estimate required to construct \nthem.  Following the System Impact Study, pursuant to Section 10.16 the Facilities Study will \nrefine those estimates leading into the Interconnection Agreement process.40  The report will be \navailable following the System Impact Study, consistent with the Show Cause Order directive.  \nHorizon West also recognizes the need for timely progression of required studies.  \nAccordingly, the proposed Horizon West Tariff revisions shorten the timeline for interconnection \nstudies at each step of the process to the maximum extent achievable (Sections 10.8 - 10.12).  \nUnder the proposed Large Load study procedures, Horizon West must notify the applicant \nwhether a System Impact Study is required within ten (10) Business Days of the Completed \nApplication Date and must tender a System Impact Study Agreement within ten (10) Business \nDays of receipt of the Completed Interconnection Application.  The applicant must execute that \nagreement within ten (10) Business Days and, for a Large Load Interconnection, remit a study \ndeposit together with financial security drawable to cover System Impact Study costs and, if \nnecessary, Facilities Study costs.  Horizon West must complete the System Impact Study no later \nthan ninety (90) Calendar Days after the Completed Application Date.  This 90-day timeline runs \nfrom the Completed Application Date, not from execution of the System Impact Study \nAgreement, and therefore includes the time for the System Impact Study Agreement and deposit \nsteps.  The result of this proposed schedule is the initiation and completion of a System Impact \nStudy within the 60-90 calendar day range that the Commission identified as reasonable.  \n \nThis proposed structure is consistent with the study process the Commission accepted for \nSouthwest Power Pool, Inc.’s (“SPP”) High Impact Large Loads (“HILL”).  For that process, \nSPP must complete its HILL Delivery Point Study and issue a study report within 90 calendar \n \n38  Horizon West Tariff § 10.12.1. \n39  Show Cause Order at P 62. \n40  Horizon West Tariff § 10.16."},{"page":11,"startToken":4931,"endToken":5362,"text":"11 \ndays after receiving the executed study agreement, study data, and deposit.41  That study uses \npower flow and short circuit analyses; SPP then performs an Electromagnetic Transient study \nonly when those analyses identify system weaknesses caused by the Large Load, similar to \nHorizon West’s Large Load System Impact Study process.42  The HILL Delivery Point Study \nworks “in conjunction with” SPP’s existing load connection study requirements.43  It is followed, \nas needed, by a supplemental load connection study performed by the host transmission owner \nand by SPP’s existing processes for obtaining long-term transmission service.  SPP’s tariff does \nnot subject those later steps to the 90-day deadline,44 but the Commission found this process just \nand reasonable.45  Horizon West’s approach follows the same structure.  A time-certain System \nImpact Study culminates in a report within 90 days, and that report gives the Eligible Customer \nthe information the Show Cause Order requires. \nB. Co-Located Load  \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff appears to be unjust and unreasonable because it lacks sufficiently \nclear and consistent tariff provisions addressing the rates, terms, and conditions that apply to co-\nlocation arrangements.46  \nHorizon West Solution:  As acknowledged by the Commission in its Show Cause Order \nand further addressed in Part III below, Horizon West has a limited role in addressing co-location \nof generation with Large Load.  The interconnection of wholesale generation to the CAISO \nControlled Grid is governed by the CAISO Tariff, including the Resource Interconnection \nStandards in Appendix KK.  Horizon West’s role is to process and study the Interconnection of a \nLarge Load and to coordinate with CAISO so that the generating facility and the Large Load are \nstudied, interconnected, and operated together.  As revised, the Horizon West Tariff and CAISO \nTariff jointly allocate those responsibilities. \nRecognizing CAISO’s predominant role in studying generator interconnections, Horizon \nWest proposes the adoption of tariff provisions that tie into CAISO requirements including: \n• New Section 10.18.6 requires Horizon West to study co-located Large Loads in \naccordance with proposed CAISO Tariff Section 25.7.6 and requires specific \ninformation regarding the net injection or net withdrawal of the combined co-\nlocated arrangement.47   \n \n41  See Sw. Power Pool, Inc., 194 FERC ¶ 61,031, at P 15 (2026). \n42  Id. \n43  Id. at P 62.   \n44  Id. at P 16. \n45  Id. at P 62. \n46  Show Cause Order at PP 85, 93-102. \n47  Horizon West Tariff §§ 10.5.1(viii), 10.18.6; CAISO Proposed Tariff § 25.7.6; CAISO Proposed Tariff, App. \nKK § 2.4.4."},{"page":12,"startToken":5362,"endToken":5854,"text":"12 \n• Proposed Section 10.5.1(viii) requires the Large Load Interconnection Application \nto include information about the co-located Generating Facility sufficient to \nensure compliance with Sections 25.1.1, 25.7.5, and 25.7.6 of the CAISO Tariff. \n• Alignment of Horizon West procedures to ensure the planned coordination \nenvisioned in the proposed CAISO Tariff Section 25.7.6 by which CAISO will \nconduct Interconnection Studies in coordination with the PTO that account for the \nnet impact of the co-located configuration on the CAISO Controlled Grid, with \nmemorialization of the combined co-located operation in the Generator \nInterconnection Agreement.  Horizon West respectfully defers to CAISO on its \ndescription of the generator interconnection revisions and processes. \nHowever, Horizon West notes that proposed new Section 10.18.6 of the Horizon West \nTariff provides that the Interconnection processes applicable to a co-located Large Load are \notherwise the same as those applicable to any other Large Load, and are, therefore, subject to the \nsame readiness requirements, study timelines, ride-through and ramp-rate requirements, \nenergization conditions, and cost recovery obligations as a Large Load.  This treatment avoids \nundue discrimination between the two configurations while accounting for the technical \ncharacteristics unique to co-location.  \nAdditionally, in Section 10.18.6, Horizon West provides a path for adhering to CAISO’s \nproposed revised CAISO Tariff Section 25.1.1 such that a Generating Unit that will not inject \nEnergy onto the CAISO Controlled Grid and will instead serve a co-located End User as \npermitted by the Local Regulatory Authority is not required to submit an Interconnection \nRequest pursuant to CAISO’s Appendix KK.  Section 10.18.6 also requires that, under such \narrangements, the Generating Unit has sufficient control technologies to ensure the co-located \narrangement has no material impact on the CAISO Controlled Grid.48  Proposed new Section \n8.1.5.1(ix) further provides that Horizon West is not obligated to energize a co-located Large \nLoad until necessary control and system protection technologies have been installed, tested, and \nvalidated; it also requires the Large Load to be metered separately from its co-located generation. \nC. Flexible Large Load Services \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff and PTO Tariffs appear to be unjust and unreasonable because they \nlack a study process for evaluating the ability of Large Loads to flexibly reduce demand and the \ninformation required to study providing flexible service while maintaining reliability.49  The \nCommission also noted that the CAISO Tariff allows an interconnection customer to request a \nlimited operation study for a generating unit before its Interconnection Facilities or Network \nUpgrades are complete, but it offers no comparable interim option for load.50   \nHorizon West Solution:  Horizon West defers to CAISO regarding transmission service \nofferings such as the non-firm or flexible services discussed in the Show Cause Order. \n \n48  CAISO Proposed Tariff § 25.1.1. \n49  Show Cause Order at PP 59, 104-05. \n50  Id. at P 27."},{"page":13,"startToken":5854,"endToken":6436,"text":"13 \nWith respect to interconnection service, Horizon West proposes two interim services that \nallow a Large Load to begin taking interconnection service before all of its upgrades are in place \nthat reflects the Large Load’s ability to reduce load: the existing Partial Interim Service and FILI \nService.  Both services will be available to Eligible Customers serving Large Load. The process \nfor application and receipt of these forms of interconnection service will include the following \nsteps: \n \nHorizon West proposes to define FILI Service as aligned with CAISO’s proposed \ndefinition.51  Under new Section 10.18.2, FILI Service is available if the Large Load can reduce \nits load at a specified Point of Interconnection according to protocols in a FILI Service \nAgreement among the Large Load, Horizon West, and CAISO.  The FILI Service Agreement \nspecifies the Network Upgrades or Interconnection Facilities needed to conclude FILI Service \nand provide full Interconnection service.52  To align with CAISO’s revised Tariff, Section \n10.18.3 requires the agreement to identify required Interconnection Facilities, protection and \ncontrol systems, equipment, and operating limitations that apply, and FILI Service may not \ncommence until all such equipment is installed and commissioned.   \n \nThe Eligible Customer must state in its Interconnection Application whether it intends to \nrequest Partial Interim Service or FILI Service.  Under the new Section 10.18, Horizon West will \nthen perform an analysis and report the extent to which each requested interim service can be \nprovided consistent with the Horizon West Tariff and proposed Section 25.7.2 of the CAISO \nTariff establishing FILI Service.53  The maximum amount of interim service is based on the \nanticipated availability of capacity and the information the Eligible Customer submits, and \nHorizon West will update the analysis annually.  In addition, Section 10.12.1 requires the Large \nLoad System Impact Study procedures to evaluate any ability of the Large Load to limit its \nwithdrawals from the CAISO Controlled Grid so that the study process itself recognizes the \noperational characteristics of flexible Large Loads. \nNew Section 10.18.4 requires the FILI Service Agreement to specify the circumstances, \ncontingencies, and operating conditions under which the Large Load may be curtailed; the \ncurtailment mechanism; the entity responsible for performing the curtailment; and the \nnotification method, required response times, permissible duration, restoration timeline, testing \nand verification requirements, and interim operating limits.  Further, new Section 10.18.5 permits \nCAISO or Horizon West to terminate FILI Service and disconnect the Large Load if it does not \nadhere to the FILI Service Agreement, consistent with Good Utility Practice.  Further, Section \n10.17 requires the Large Load Interconnection Agreement to contain provisions requiring the \ninstallation and maintenance of any equipment or facilities necessary for the PTO to ensure its \nability to disconnect or otherwise isolate the Large Load as required by Section 25.7.1 of the \nCAISO Tariff.  Section 8.1.5.1(vii) makes an effective FILI Service Agreement a condition of \n \n51  Horizon West Tariff § 3.35 (definition of “Flexible Interim Load Interconnection (‘FILI’) Service”); CAISO \nProposed Tariff, App. A; CAISO Proposed Tariff § 25.7.2.  FILI Service is defined as “[c]urtailable, interim \ninterconnection service for a Large Load provided by the CAISO and Participating TO, enabling the Large Load to \ninterconnect prior to the completion of the Large Load’s Network Upgrades or Interconnection Facilities.”   \n52  CAISO will post the FILI Service Agreement on its website.  See CAISO Proposed Tariff § 25.7.2.  \n53  Horizon West Tariff §§ 10.18, 8.1.5.1(vii)."},{"page":14,"startToken":6436,"endToken":6930,"text":"14 \nenergization where applicable.  These provisions align with CAISO’s proposal in Section 25.7.2 \nof the CAISO Tariff.  \nD. Cost Shifting and Cost Recovery Agreements \nCommission Concern:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff and PTO Tariffs appear to be unjust and unreasonable because they \nlack adequate mechanisms to mitigate the risk of cost shifting among transmission customers.54  \nThe Show Cause Order directed the PTOs to address: (i) assignment of the Network Upgrade \ncosts and their associated costs, that are needed to provide transmission service to Eligible \nCustomers serving Large Loads; (ii) the need for a pro forma cost recovery agreement to \nmitigate the risk of cost shifting; and (iii) a mechanism to ensure that any payments attributable \nto the Large Load are appropriately credited toward the PTO’s TRR and documented in the \nannual informational filing for formula rates.55  The Commission also indicated a response \nshould clarify how the minimum contribution and financial security required by an Eligible \nCustomer serving a Large Load is calculated, i.e., whether by a per-MW figure or another \nmethodology.56 \nHorizon West Solution:  Through Section 10.17.2, Horizon West will utilize a Cost \nRecovery Agreement in the form of Attachment A to the Horizon West Tariff to address \nassignment of costs associated with the construction and operation of any Network Upgrades \nresulting from the Interconnection of the Large Load.  The Cost Recovery Agreement will be \nbetween Horizon West and the Eligible Customer, and CAISO may join at its election.57  The \nCost Recovery Agreement requires the Eligible Customer to pay 100% of the actual costs of the \nLarge Load Network Upgrades through the Total Required Revenue Commitment.  The Total \nRequired Revenue Commitment establishes both the obligation to pay actual costs and the \nobligation to maintain financial security for the Eligible Customer.  If the Eligible Customer does \nnot provide sufficient service revenue attributable to the Large Load to Horizon West through \nCAISO’s Access Charges to cover the Eligible Customer’s Annual Required Revenue \nCommitment, the Eligible Customer must provide Cost Recovery Payments to fill the gap in cost \nrecovery.  Cost Recovery Payments58 received are credited against Horizon West’s Transmission \nRevenue Requirement.  This ensures the Eligible Customer pays the full costs of their Network \nUpgrades.  Horizon West will provide a separate workpaper in the informational filing detailing \nthe accounting treatment and crediting for the Annual Required Revenue Commitment.  \n The Cost Recovery Agreement also provides that the required amount of financial \nsecurity shall be decreased as the Eligible Customer pays the Total Required Revenue \nCommitment over time.  Horizon West may draw upon the required financial security in the \nevent of non-payment, termination, cancellation, or withdrawal to ensure that the Large Load is \n \n54  Show Cause Order at P 65. \n55  Id. at PP 65-66, 76-84. \n56  Id. at PP 81-82. \n57  Horizon West Tariff § 10.17.2; Attachment A. \n58  As defined in Horizon West Tariff, Att. A § 1.3."},{"page":15,"startToken":6930,"endToken":7416,"text":"15 \nresponsible for costs incurred to provide transmission service, including the cost of network \nupgrades and to prevent cost shifting to other customers.  \nHorizon West has not proposed to allow an Eligible Customer to satisfy the financial \nsecurity required under the Cost Recovery Agreement with credit support posted under a retail \nagreement.  The Commission’s preliminary finding that an Eligible Customer “may include” \nsuch security permits this approach but does not require it.59  The approach does not fit a Non-\nLSE PTO.  Horizon West has no retail customers and is not party to any retail service agreement.  \nAny retail security would be held by a third-party load-serving entity, would secure that entity’s \nretail obligations, and be subject to that entity’s draw rights and priorities, none of which \nHorizon West can control or enforce.  Such security therefore would not be sufficient to secure \nthe Eligible Customer’s obligations under the Cost Recovery Agreement.  Accepting it would \nleave other transmission customers exposed to the cost-shifting risk the Order is intended to \nprevent.  The concern about duplicative credit requirements also does not arise here.  The \nsecurity required under the Cost Recovery Agreement secures a separate, Commission-\njurisdictional payment obligation owed to Horizon West, not the retail obligation owed to the \nload-serving entity.  Requiring a single form of security held directly by the transmission owner \nis also simpler to administer and applies uniformly.    \nHorizon West Tariff Section 10.17 requires the Interconnection Agreement itself to \ninclude cost responsibilities, financial security, and payment provisions for all engineering, \nequipment, construction, ownership, operation, and maintenance costs of any Direct Assignment \nFacilities, Reliability Upgrades, Interconnection Facilities, or Network Upgrades.  Section 8.1.2 \nrequires the party requesting Interconnection to pay all such costs, and Horizon West has \nspecified that this includes Interconnection for Large Loads throughout the Horizon West Tariff.   \nLastly, Horizon West’s Section 13.2.1 requires Horizon West to conduct reasonable credit \nreview procedures and obtain financial security from the Eligible Customer.  The financial \nsecurity may take the form of an unconditional and irrevocable letter of credit or an alternative \nform acceptable to Horizon West and consistent with commercial practices under the Uniform \nCommercial Code, in the amount of the Total Required Revenue Commitment set forth in the \nCost Recovery Agreement.60  Horizon West’s Tariff conditions Large Load energization on \nposting all required financial security pursuant to Section 8.1.5.1(viii) and asserts that this \nrequirement will be effectuated through the Cost Recovery Agreement.  \nThese provisions ensure that Eligible Customers and Large Loads, not other transmission \ncustomers, bear the costs incurred to serve them. \nE. Pro Forma Transmission Service Agreements or Other Agreements \nIn the Show Cause Order, the Commission made a preliminary finding that the CAISO \nTariff and PTO Tariffs appear to be unjust and unreasonable because they lack pro forma \n \n59  Show Cause Order at P 82.   \n60  Horizon West Tariff §§ 8.1.5.1(viii), 13.2.1."},{"page":16,"startToken":7416,"endToken":7910,"text":"16 \ntransmission service agreement language memorializing the above terms.61  Horizon West notes \nthat the CAISO Tariff controls the provision of transmission service and defers to CAISO on this \npoint.62  \nSpecific to interconnection, Horizon West believes the specificity in the revised Horizon \nWest Tariff will provide certainty to potential Eligible Customers serving Large Load with \nrespect to the Commission’s primary concerns, including what ongoing operational and \nreliability requirements will apply, and the control CAISO will have over the Large Load.  Those \nareas and their enforceability appeared to be the primary concerns raised by the Commission in \nthe Show Cause Order.63  While Horizon West understands including the language in a pro forma \nagreement may simplify compliance, Horizon West has provided binding tariff language to \nremedy the Commission’s concern.  CAISO will be fully able to enforce this tariff language to \nensure the ongoing operational requirements are fully realized through individualized \ninterconnection agreements consistent with the Horizon West Tariff.64  Horizon West is further \nconcerned that developing a pro forma transmission service agreement in advance of establishing \nthe procedures through the Horizon West Tariff, and CAISO Tariff as applicable, may be \npremature and commit Horizon West to language that does not meet the needs of either Horizon \nWest or an Eligible Customer taking transmission service on behalf of Large Loads.  Horizon \nWest also has yet to process any Large Load interconnection requests which could further inform \nthe needs of a pro forma Interconnection Agreement.  However, Horizon West commits to \nparticipating in any future initiative involving the development a pro forma Large Load \nInterconnection Agreement, in coordination with CAISO and other PTOs, and updating its Tariff \naccordingly. \nF. Protection for Existing Commercial Arrangements  \nCommission Concern:  The Show Cause Order directed respondents to provide a \nreasoned explanation for how their proposal will avoid disrupting any existing commercial \narrangements and provide a reasonable implementation period, including time to finalize \nagreements nearing completion, and include a reasonable effective date.65 \nHorizon West Solution:  Horizon West has not received any Load interconnection \nrequests on its facilities that would be affected by the transition provision.  Horizon West thus \nrequests an effective date of February 16, 2027, which is coordinated with the effective date \nCAISO is requesting for its companion tariff revisions and gives Eligible Customers and Large \nLoads reasonable notice of the new requirements.  The new Section 10.20 of the Horizon West \nTariff provides that the provisions specific to Eligible Customers and Large Loads do not apply \nto a Load that is operational, or that has a Completed Interconnection Application, before \n \n61  Show Cause Order at PP 56, 63. \n62  See id. at P 39 (“CAISO, however, is responsible for access to and the provision of transmission service, \nincluding transmission and ancillary services, to all Eligible Customers, and the reliability of that transmission \nservice.”). \n63  Id. at P 64. \n64  Id. (raising concerns that requirements may be unenforceable by CAISO without a pro forma agreement). \n65  Id. at P 34."},{"page":17,"startToken":7910,"endToken":8315,"text":"17 \nFebruary 16, 2027, unless and until the Load is modified or increased such that it would be a \nLarge Load, or the Load elects to be treated as a Large Load.66  This transition provision mirrors \nproposed Section 25.7 of the CAISO Tariff.  This approach is just and reasonable. \nG. Coordination with CAISO \nHorizon West also clarifies in Section 8.1.5.1 that energization is conditioned on the \nEligible Customer demonstrating that:  \n \n• The Interconnection Agreement and Cost Recovery Agreement are effective;  \n• Any Energy the Large Load withdraws from the CAISO Controlled Grid will be \npurchased from an entity authorized to make such sales by the applicable Local \nRegulatory Authority;  \n• A Scheduling Coordinator will represent the Large Load in compliance with Section \n25.7.3 or 25.7.3.1 of the CAISO Tariff;  \n• Access Charges will be paid consistent with the CAISO Tariff;  \n• The information required by Section 25.7.1 of the CAISO Tariff has been provided; \n• Required equipment to facilitate monitoring, disturbance recording, telemetry, \ncommunication, control, protection, and disconnection has been installed, tested, and \ncommissioned;  \n• Any FILI Service Agreement is effective;  \n• All required financial security has been posted;  \n• For co-located or behind-the-meter configurations, control and protection technologies \nhave been validated, and the Large Load is separately metered.  This ensures no Large \nLoad is energized until the information and equipment necessary to preserve reliability \nand to operate consistent with CAISO requirements is in place; and \n• The Large Load meet all frequency ride-through requirements, voltage ride through \nrequirements, post-fault active power recovery requirements, and ramp rate limitations in \naccordance with CAISO Tariff Sections 25.7.1.1, 25.7.1.2, 25.7.1.3, and 25.7.1.4.  \nH. Ministerial and Conforming Revisions \nHorizon West has also made several ministerial or conforming revisions to either clarify \nor correct its tariff language or to better clarify the Horizon West Tariff’s relation to the CAISO \nTariff.  These include: \n• Updating the Table of Contents; \n• Clarifying in Section 1 that Horizon West does not provide retail electric service; \n• Clarifying in Section 1.3 how End-Users access the CAISO Controlled Grid; \n• Defining FILI Service in Section 3.35 consistent with the CAISO Tariff; \n• Clarifying Gross Load’s definition in Section 3.40 to better match CAISO; \n• Revising the definition of “Interconnection” in Section 3.41 to address a typographical \nerror; \n• Defining Interconnection Facilities in Section 3.44 to provide clarity; \n \n66  Horizon West Tariff § 10.20."},{"page":18,"startToken":8315,"endToken":8756,"text":"18 \n• Defining Point of Interconnection in Section 3.69 to align with CAISO; \n• Revising the definition of Reliability Upgrade in Section 3.82 to refer to a “facility” \nrather than an undefined term; \n• Ministerial additions of subsections and headers throughout Sections 8, 9, and 10 to \nenhance readability of the tariff for customers and stakeholders; \n• Retitling Section 13 “Creditworthiness and Financial Security”;  \n• Clarified tariff by consistent use of Eligible Customer throughout; \n• Updating the date in Appendix I to change from “January 1, 201[ ]” to “January 1, 20[ ]”; \nand \n• Updating the Designated Representatives in Appendix II to ensure responsiveness. \nIII. \nRESPONSES TO REMAINING ELEMENTS OF THE SHOW CAUSE ORDER \nThe Show Cause Order directed PTOs to explain which of the Commission’s directives \ntheir filing resolves and how it resolves them.67  Horizon West submits that the remaining \nelements of the Show Cause Order are either inapplicable to Horizon West as a Non-LSE PTO or \nwere directed to CAISO in the Show Cause Order.  \nThis includes the requirement to provide data on CAISO’s website regarding Network \nUpgrade costs and planning for serving Large Loads.68  CAISO has proposed that each \nTransmission Plan report the aggregate amounts of proposed and completed Large Load \nadditions by Transmission Zone and the planned Network Upgrades and estimated costs needed \nto accommodate Large Loads, identified by type of equipment.  For its part, Horizon West will \nfacilitate this by providing relevant data under Section 10.3, which commits Horizon West to \napprise CAISO of Large Load interconnections through its inputs to the Base Case, \nInterconnection Studies, and the Transmission Planning Process.  \nThe Commission primarily directed its questions and findings on co-located load to \nCAISO, given CAISO’s role in generator interconnection.69  Horizon West therefore defers to \nCAISO on matters governed by the CAISO Tariff.  To the extent the Commission’s directive \nimplicates the PTO Tariffs, Horizon West has addressed it through Sections 8.1.5.1(ix), 10.5.1, \nand 10.18.6 of the Horizon West Tariff.  Horizon West has revised its tariff to align with \nCAISO’s co-location approach. \nSimilarly, the Commission directed its preliminary finding regarding new transmission \nservices for flexible Large Loads, and its directive to submit an informational report regarding \nresource adequacy, solely to CAISO.70 \nLast, Horizon West notes that CAISO has indicated that it intends to take up the matter of \ninterconnection of electrically proximate Large Load in a future stakeholder proceeding.  As \n \n67  Show Cause Order at P 34. \n68  Id. at PP 66, 70-75.  \n69  Id. at PP 93-102 (covering rate design, ancillary services, transmission service, behind-the-meter netting, and \ninterconnection via generator processes). \n70  Id. at PP 104 & n.222, 120-22."},{"page":19,"startToken":8756,"endToken":9219,"text":"19 \nsuch, Horizon West proposes no tariff revisions in this filing for such elements identified in the \nShow Cause Order.71  This ensures that Horizon West remains aligned with CAISO in this \nevolving process.  Horizon West commits to participation in any such future stakeholder process \nwith CAISO. \nIV. \nRESPONSES TO THE COMMISSION’S REMAINING BRIEFING QUESTIONS \nThe Show Cause Order requested responses to specific briefing questions.72  Consistent \nwith the division of responsibilities between CAISO and the PTOs recognized by the \nCommission in the Show Cause Order, Horizon West responds to those briefing questions \napplicable to it as a PTO and defers to CAISO on those questions directed to CAISO or that \nconcern matters governed by the CAISO Tariff.  \nIn the Show Cause Order, the Commission recognized that the framework under which \nCAISO provides transmission service is unique among the RTOs/ISOs and that certain \nresponsibilities fall to the PTOs.  The Commission explained that the PTOs “have responsibility \nfor wholesale load interconnection studies,” while CAISO “is responsible for access to and the \nprovision of transmission service, including transmission and ancillary services, to all Eligible \nCustomers, and the reliability of that transmission service.”73  The Commission further \nrecognized that the PTOs may be primarily responsible for conducting the studies that evaluate \nwhether a Large Load may be interconnected to the transmission system and whether Network \nUpgrades are necessary, that this role stems from how CAISO and the PTOs allocated rights and \nresponsibilities in the governing documents establishing CAISO, and that the Commission does \nnot seek to alter that allocation of rights and responsibilities.74  Consistent with that framework, \nthe Commission directed the PTOs to respond to the extent the matters addressed herein \nimplicate aspects of their respective tariffs.75 \nWithin this framework, Horizon West’s role is to process and study requests to \ninterconnect Eligible Customer Large Loads to its facilities under the Horizon West Tariff, to \nconstruct any Direct Assignment Facilities and Reliability Upgrades required for those \ninterconnections and recover their costs from the Eligible Customer, and to provide CAISO with \nthe necessary information for its operations and its Transmission Planning Process.  \nTransmission service over the CAISO Controlled Grid, including Horizon West’s facilities, is \nprovided by CAISO under the CAISO Tariff.  CAISO likewise administers the CAISO Markets \nand the generator interconnection procedures under the CAISO Tariff, and the California Public \nUtilities Commission has primary responsibility for resource adequacy within the CAISO \nfootprint.76  Moreover, as a Non-LSE PTO, Horizon West serves no retail load and does not \nforecast or plan for load growth within a retail service territory.   \n \n71  Id. at PP 113-19, 127. \n72  Id. at PP 123-27.  \n73  Id. at P 39. \n74  Id. at P 51. \n75  Id. at P 40; see also id. at P 34. \n76  Id. at P 122."},{"page":20,"startToken":9219,"endToken":9715,"text":"20 \nAccordingly, where a briefing question is directed to CAISO or concerns matters \ngoverned by the CAISO Tariff, Horizon West indicates the question is not applicable.  Where a \nbriefing question concerns matters within Horizon West’s responsibilities as a PTO, Horizon \nWest has addressed it through the proposed revisions to the Horizon West Tariff, most of which \nare discussed in Part II above.  To assist the Commission’s review, Horizon West identifies below \neach briefing question and where it is addressed in this transmittal letter. \n1. \nWhat would be a reasonable implementation period to ensure minimal \ndisruption to such existing commercial arrangements? \nThis question is addressed in Part II.F and Part V of this transmittal letter.  Horizon West \nrequests an effective date of February 16, 2027, which aligns with the effective date CAISO is \nrequesting for its tariff revisions, gives Horizon West time to implement the revised procedures \nand update its business practices, and gives Eligible Customers and Large Loads reasonable \nnotice of the new requirements.  Horizon West has not received any Load interconnection \nrequests on its facilities that would be affected by the proposed revisions, and it is not aware of \nany existing commercial arrangements that the requested implementation period would disrupt. \n2. \nHow to allow a reasonable amount of time to finalize ongoing agreements \nthat are nearing completion as of the date such tariff provisions are filed with \nthe Commission. \nThis question is addressed in Part II.F of this transmittal letter.  Consistent with CAISO’s \nproposed Section 25.7, the provisions of the Horizon West Tariff specific to Eligible Customers \nand Large Loads will not apply to a Load that is operational, or that has a Completed \nInterconnection Application, before the effective date, unless and until the Load is modified or \nincreased such that it would be a Large Load, or the Load elects to be treated as a Large Load.  \nAn interconnection request that is complete before the effective date may therefore proceed \nthrough its studies and Interconnection Agreement under the existing provisions of the Horizon \nWest Tariff, without being required to satisfy the new application, readiness, and financial \nsecurity requirements. \n3. \nWhat, if any, potential impacts on regional and local transmission planning \nwould arise from the introduction of the new transmission services discussed \nherein?  \nAs to the effects on regional and local transmission planning, Horizon West participates \nin CAISO’s Transmission Planning Process, and its proposed revisions are designed to give \nCAISO and other planners accurate, timely information about Large Loads.  Under Section 10.3, \nHorizon West will apprise CAISO of Large Load interconnections through its inputs to the Base \nCase, Interconnection Studies, and the Transmission Planning Process.  CAISO, in turn, proposes \nto include planned and forecasted Large Loads, including transmission additions or upgrades \nplanned under all PTO Tariff interconnection processes, as inputs to its Unified Planning \nAssumptions and Study Plan.  CAISO will also review those planned additions monthly and \nidentify any that indicate high operational risk or uncertainty based on NERC Reliability \nStandards."},{"page":21,"startToken":9715,"endToken":10063,"text":"21 \n4. \nWhen planning for load growth, how would transmission providers and \nplanners account for flexible Large Loads’ potential preference to take the \nnew transmission services, including potential uncertainties around the type, \nlocation, and quantity of such expected loads? \nThe readiness requirements in Section 10.5.1, including ramp schedules, Site Control, \npermits, and disclosure of affiliated requests, reduce uncertainty about the type, location, and \nquantity of expected Large Loads and help ensure that planners rely on credible projects rather \nthan speculative ones.  For flexible Large Loads that elect interim service, each FILI Service \nAgreement will identify the Network Upgrades or Interconnection Facilities required to conclude \nFILI Service.  CAISO will account for FILI loads in its Base Case, Full Network Model, and \nOperating Procedures.  Thus, following the proposed revisions CAISO can therefore account for \nboth the curtailable interim operation of these loads and the facilities required to transition them \nto full service.  The proposed revisions from CAISO, Horizon West, and other PTOs should \nenhance the flow of information regarding Large Loads into CAISO’s transmission planning \nprocess. \n5. \nInformation regarding potential structures for agreements between the \ntransmission owner/provider and an Eligible Customer to prevent unjust and \nunreasonable cost shifts among transmission customers related to Network \nUpgrade costs required for Large Loads. \nThis question is addressed in Part II.D of this transmittal letter. \n6. \nInformation on what an appropriate minimum level of cost recovery and \nfinancial security from an Eligible Customer would be under any such \nagreements. \nThis question is addressed in Part II.D of this transmittal letter. \n7. \nWhether the Tariff remains just and reasonable without provisions that \nrequire the evaluation of alternative transmission technologies in studies for \nthe provision of transmission service, using models that are capable of \nevaluating the transmission system to accurately account for advanced \ntransmission technologies, in all instances, without the need for a request \nfrom the Eligible Customer seeking transmission service on behalf of Large \nLoad. \nThis question is addressed in Part II.A.4 of this transmittal letter.  Horizon West proposed \nprovisions that require the evaluation of alternative transmission technologies."},{"page":22,"startToken":10063,"endToken":10409,"text":"22 \n8. \nIf traditional Network Upgrades are selected instead of alternative transmission \ntechnologies, inclusion in the study report to the Eligible Customer seeking \ntransmission service on behalf of Large Load of a sufficiently clear \ndemonstration of why alternative transmission technologies are not feasible \n(i.e., would not resolve reliability violations identified or meet the relevant \nplanning criteria) or would not result in lower costs or a faster timeline for \naccommodating the transmission service request. \nThis question is likewise addressed in Part II.A.4 of this transmittal letter.  Section \n10.12.1 of the Horizon West Tariff provides that, if traditional Network Upgrades are selected \ninstead of alternative transmission technologies, Horizon West will provide a demonstration of \nwhy alternative transmission technologies are not feasible or would not result in lower costs or a \nfaster timeline for accommodating the Large Load Interconnection request, and a copy of the \ncompleted System Impact Study will be made available to the Eligible Customer. \n9. \nWhether specific characteristics of providing transmission service to Eligible \nCustomers on behalf of Large Loads warrant requirements beyond those \ncontemplated here, we seek further briefing. \nHorizon West does not propose requirements beyond those described in Part II of this \ntransmittal letter at this time.   \n10. \nTo what extent would CAISO allow an interconnection customer’s \ngenerating facility serving electrically proximate Large Load or large co-\nlocated load to participate in CAISO’s energy and ancillary services market, \nand if CAISO were to allow them to participate, what restrictions or \nmitigation would CAISO apply? \nNot applicable.  \n11. \nTo the extent that CAISO plans for the electrically proximate Large Load or \nlarge co-located load associated with an interconnection customer’s \ngenerating facility for resource adequacy purposes, would CAISO account \nfor the generating facilities serving electrically proximate Large Load or \nlarge co-located load in the resource adequacy construct?  \nNot applicable.  \na. Would CAISO allow the generating facilities serving electrically \nproximate Large Load or large co-located load to participate in CAISO’s \ncapacity market?   \nNot applicable.  \nb. Would CAISO accredit these generating facilities using the same method \nas other CAISO generating facilities?   \nNot applicable."},{"page":23,"startToken":10409,"endToken":10764,"text":"23 \nV. \nPROPOSED EFFECTIVE DATE AND WAIVER \n \nHorizon West respectfully requests that the Commission accept the proposed revisions as \nof February 16, 2027, which aligns with the effective date proposed by the CAISO in its section \n205 filing.77  The requested effective date is consistent with the Commission’s directive that \ntariff revisions include a reasonable implementation period and a reasonable effective date to \nensure minimal disruption to existing or ongoing commercial arrangements.78  Although Horizon \nWest is not aware of any existing commercial arrangements that would be affected by the tariff \nrevisions proposed herein, the requested effective date will provide Horizon West adequate time \nto implement the tariff changes, update applicable procedures and business practices, and ensure \nthat requests for service from Eligible Customers taking transmission service on behalf of Large \nLoads are processed in a manner consistent with the revised tariff framework.  Establishing an \neffective date that aligns with CAISO’s implementation schedule will promote consistent \napplication of the revised tariff provisions throughout the CAISO Controlled Grid and avoid \nunnecessary operational and procedural uncertainty.  For these reasons, Horizon West \nrespectfully requests that the Commission find that the proposed effective date is just and \nreasonable and complies with the Commission’s directive regarding implementation timing. \n \nTo the extent necessary, Horizon West respectfully requests waiver of any applicable \nrequirement of Part 35 not addressed herein. \nVI. \nCONTENTS OF THE FILING \nIn addition to this transmittal letter, this filing contains the following components: \n \nAppendix A:  Clean Version of the Revised Sections of the Horizon West Tariff;  \n \nAppendix B:  Redlined Version of the Revised Sections of the Horizon West Tariff; and \n \nAppendix C: Pro Forma Cost Recovery Agreement. \nVII. \nCORRESPONDENCE AND SERVICE \n \nThe following persons are authorized to receive notices and service with respect to this \nfiling:79   \n \n \n \n \n \n \n \n77  CAISO Proposed Tariff § 25.7. \n78  Show Cause Order at P 5. \n79  To the extent necessary, Horizon West respectfully requests a waiver of Rule 203(b)(3) of the Commission’s \nRules of Practice and Procedure, 18 C.F.R. § 385.203(b), to permit all of the persons listed to be placed on the \nofficial service list for this proceeding."},{"page":24,"startToken":10764,"endToken":10938,"text":"24 \nElizabeth Ramey \nSenior Attorney \nNextEra Energy, Inc. \n801 Pennsylvania Avenue, NW \nSuite 220 \nWashington, DC 20004 \n(202) 909-5696 \nelizabeth.ramey@nexteraenergy.com \nMeghan O’Brien  \nVan Ness Feldman, LLP \n2000 Pennsylvania Avenue, NW \nSuite 6000 \nWashington, DC 20006 \n(202) 298-1800 \nmobrien@vnf.com  \n  \n \nVIII. CONCLUSION \n \nFor the reasons set forth above, Horizon West respectfully requests that the Commission \naccept the proposed revisions to the Horizon West Tariff, effective February 16, 2027.  Horizon \nWest furthermore requests that the Commission determine with respect to the remaining \nelements of the Show Cause Order that Horizon West has complied with the Show Cause Order \ncomponents applicable to it as a Non-LSE PTO.  Accordingly, Horizon West respectfully \nrequests that the show cause proceeding be terminated with respect to Horizon West. \n \n \n \n \n \n \n \n \nRespectfully submitted, \n \n \n \n \n \n \n \n/s/ Meghan O’Brien  \n \n \n \n \n \n \n \n \nMeghan O’Brien  \nNolan Brickwood \nJoseph B. Nelson  \nJedrick M. Kim  \nVan Ness Feldman, LLP \n2000 Pennsylvania Avenue, NW \nSuite 6000 \nWashington, DC 20006 \n(202) 298-1800 \nmobrien@vnf.com  \nnbrickwood@vnf.com \njbn@vnf.com      \njkim@vnf.com \n \n \n \n \n \n \n \nCounsel for Horizon West Transmission, LLC \n \nEnclosure"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":800,"startToken":0,"endToken":478},{"p":2,"at":800,"title":"I. BACKGROUND","method":"printed heading","endPage":2,"endAt":817,"startToken":478,"endToken":480},{"p":2,"at":817,"title":"A. Horizon West","method":"printed heading","endPage":2,"endAt":2573,"startToken":480,"endToken":748},{"p":2,"at":2573,"title":"B. Show Cause Order","method":"printed heading","endPage":3,"endAt":1693,"startToken":748,"endToken":1092},{"p":3,"at":1693,"title":"C. Motion for Abeyance","method":"printed heading","endPage":4,"endAt":206,"startToken":1092,"endToken":1348},{"p":4,"at":206,"title":"II. HORIZON WEST’S PROPOSED TRANSMISSION OWNER TARIFF","method":"printed heading","endPage":5,"endAt":1161,"startToken":1348,"endToken":1970},{"p":5,"at":1161,"title":"A. Large Load Interconnection Process","method":"printed heading","endPage":11,"endAt":1002,"startToken":1970,"endToken":5082},{"p":11,"at":1002,"title":"B. Co-Located Load","method":"printed heading","endPage":12,"endAt":2303,"startToken":5082,"endToken":5707},{"p":12,"at":2303,"title":"C. Flexible Large Load Services","method":"printed heading","endPage":14,"endAt":123,"startToken":5707,"endToken":6455},{"p":14,"at":123,"title":"D. Cost Shifting and Cost Recovery Agreements","method":"printed heading","endPage":15,"endAt":2957,"startToken":6455,"endToken":7359},{"p":15,"at":2957,"title":"E. Pro Forma Transmission Service Agreements or Other Agreements","method":"printed heading","endPage":16,"endAt":1886,"startToken":7359,"endToken":7691},{"p":16,"at":1886,"title":"F. Protection for Existing Commercial Arrangements","method":"printed heading","endPage":17,"endAt":282,"startToken":7691,"endToken":7961},{"p":17,"at":282,"title":"G. Coordination with CAISO","method":"printed heading","endPage":17,"endAt":1854,"startToken":7961,"endToken":8193},{"p":17,"at":1854,"title":"H. Ministerial and Conforming Revisions","method":"printed heading","endPage":18,"endAt":677,"startToken":8193,"endToken":8413},{"p":18,"at":677,"title":"III. RESPONSES TO REMAINING ELEMENTS OF THE SHOW CAUSE ORDER","method":"printed heading","endPage":19,"endAt":302,"startToken":8413,"endToken":8803},{"p":19,"at":302,"title":"IV. RESPONSES TO THE COMMISSION’S REMAINING BRIEFING QUESTIONS","method":"printed heading","endPage":23,"endAt":4,"startToken":8803,"endToken":10410},{"p":23,"at":4,"title":"V. PROPOSED EFFECTIVE DATE AND WAIVER","method":"printed heading","endPage":23,"endAt":1589,"startToken":10410,"endToken":10631},{"p":23,"at":1589,"title":"VI. CONTENTS OF THE FILING","method":"printed heading","endPage":23,"endAt":1928,"startToken":10631,"endToken":10682},{"p":23,"at":1928,"title":"VII. CORRESPONDENCE AND SERVICE","method":"printed heading","endPage":24,"endAt":316,"startToken":10682,"endToken":10807},{"p":24,"at":316,"title":"VIII. CONCLUSION","method":"printed heading","endPage":24,"endAt":1276,"startToken":10807,"endToken":10938}]}