{"document":{"slug":"rec-20261116-5343-5","title":"Att-D_Large-Load-Straw-Proposal","issued":"2026-11-16","accession":"20261116-5343","docket":"ER27-532-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"California Independent System Operator Corporation","kind":"attachment","file":"sources/filings/text/20261116-5343_005.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5343","tier":"record","parent":"rec-20261116-5343","sha256":"1239690bc860eb78ae7b987c607386a62370abec3d7f1aa42e33d7e9adc43270","pages":39,"tokens":7358,"emptyPages":[],"textThemes":["study","registry","flex"]},"pages":[{"page":1,"startToken":0,"endToken":18,"text":"Attachment D – Technical Working Group Proposal \nLarge Loads Tariff Amendment  \nCalifornia Independent System Operator Corporation \nNovember 16, 2026"},{"page":2,"startToken":18,"endToken":61,"text":"Large Load Technical Requirements  \nStraw Proposal \n \nLarge Load Technical Requirements Working Group \nCalifornia ISO \nGridliance West LLC \nPacific Gas and Electric Company \nSan Diego Gas and Electric Company \nSilicon Valley Power \nSouthern California Edison \nValley Electric Association, Inc \n \nRevision: R0 \nJune 15, 2026"},{"page":3,"startToken":61,"endToken":194,"text":"Large Load Technical Requirements \n \nPage 2 of 38 \n \n \nTable of Contents \n1. \nIntroduction ..................................................................................................................... 3 \n2. \nProposed Technical Requirements .................................................................................... 6 \n2.1. \nFrequency Ride-Through ....................................................................................... 6 \n2.2. \nVoltage Ride-Through ........................................................................................... 8 \n2.3. \nPost Fault Active Power Recovery (PFAPR)............................................................11 \n2.4. \nRamp Rate Limit ..................................................................................................13 \n2.5. \nMonitoring and Telemetry ...................................................................................15 \n2.6. \nModeling Data .....................................................................................................17 \n2.7. \nCommissioning ....................................................................................................19 \n3. \nTechnical Requirements Under Development...................................................................22 \n3.1 \nLow Frequency Cycling.........................................................................................22 \n3.2 \nHigh Frequency Cycling ........................................................................................24 \n3.3 \nLimits on operating in constant power mode ........................................................26 \n3.4 \nPower Quality (harmonic, flicker, Rapid Voltage Change, ...) .................................27 \n3.5 \nPower Factor and Dynamic reactive support.........................................................29 \n3.6 \nPhase Angle Jump Ride Through...........................................................................31 \n3.7 \nProtection Requirements .....................................................................................32 \n3.8 \nOther Emerging Technical Requirements ..............................................................34 \n4. \nReferences ......................................................................................................................36 \n5. \nAcronym Definitions ........................................................................................................38"},{"page":4,"startToken":194,"endToken":622,"text":"Large Load Technical Requirements \n \nPage 3 of 38 \n \n1. Introduction \nThe ISO’s role with load interconnections being processed by utilities is primarily to ensure that \nproposed load interconnections are consistent with the ISO’s transmission planning and do not \ncreate reliability issues on the grid. The ISO coordinates on planning for large loads with local, \nstate, and federal regulators, and is exploring these issues with utility and industry partners in a \nbroader stakeholder initiative. This Large Load Technical Requirements Straw Proposal is one \ntrack of a broader set of ISO-led stakeholder discussions around large loads and demand \nflexibility and is directionally consistent with North American Electric Reliability Corporation \n(NERC) and industry discussions. The ISO continues to consider large load planning, \ninterconnection, transmission service, operational, and market issues in both the Large Load \nstakeholder initiative and the Demand and Distributed Energy Market Integration (DDEMI) \nstakeholder initiative.  \nThe Large Load Technical Requirements Working Group (LLTRWG) was established in October \n2025 by the ISO and the utilities interconnecting large data center loads within the ISO \nfootprint, including Pacific Gas & Electric (PG&E), San Diego Gas & Electric (SDG&E), Southern \nCalifornia (SCE), Valley Energy Authority (VEA), and Silicon Valley Power (SVP). The purpose of \nthe working group is to develop technical requirements for the reliable interconnection and \noperation of large loads connected to the ISO-controlled grid.  This document is focused \nspecifically on technical requirements associated with interconnection and reliable grid \noperation. It does not establish or address broader planning, market participation, scheduling, \nor operational requirements applicable within the ISO Balancing Authority Area (BAA), the \nExtended Day-Ahead Market (EDAM), or the Western Energy Imbalance Market (WEIM), nor \ndoes it include forecasting obligations or other market-related requirements. Those aspects are \naddressed through separate tariff provisions, business practice manuals, and market rules. \nAs part of this effort, the LLTRWG reviewed technical requirements, operating experience, \nreliability assessments, and industry guidance developed by other utilities, system operators, \nand industry organizations, including the NERC, the Energy Systems Integration Group (ESIG), \nthe Electric Power Research Institute (EPRI), and others. In addition, the working group \nperformed parametric dynamic studies on the ISO system to evaluate the potential reliability \nimpacts associated with large loads, including AI-training data centers. \nTo the extent possible, LLTRWG adopted requirements consistent with existing reliability \nstandards and other entities’ requirements. Such consistency helps facilitate a more uniform \napproach to large load interconnection requirements across different jurisdictions. Specifically, \nwhile the ride-through capability requirements are generally aligned with the ride-through \nrequirements specified in NERC PRC-029 for IBRs, they are not intended to exactly replicate the \nrequirements specified in that standard."},{"page":5,"startToken":622,"endToken":840,"text":"Large Load Technical Requirements \n \nPage 4 of 38 \n \nBased on these evaluations, LLTRWG developed proposed technical requirements in the \nfollowing areas: \n• \nFrequency ride-through  \n• \nVoltage ride-through  \n• \nPost-Fault Active Power Recovery (PFAPR)  \n• \nRamp-rate limitations  \n• \nMonitoring and telemetry requirements  \n• \nModeling data requirements  \n• \nCommissioning, including data verification and model validation  \nIn parallel, the LLTRWG continues to evaluate additional technical areas that may impact \nreliable system operation, including: \n• \nLow-frequency cycling limits (to prevent amplification of inter-area oscillations)  \n• \nHigh-frequency cycling limits (to prevent triggering of Subsynchronous Resonance (SSR), \nSubsynchronous Torsional Interaction (SSTI), and Subsynchronous Control Interaction \n(SSCI))  \n• \nRestrictions on operating in constant-power mode  \n• \nPower quality requirements, including harmonics, flicker, and Rapid Voltage Change \n(RVC)  \n• \nDynamic reactive power support  \n• \nPhase-angle jump ride-through capability  \n• \nProtection requirements  \n• \nOther emerging technical considerations  \nThe LLTRWG recognizes that NERC Project 2026-02 is currently developing reliability standards \nfor computational loads, with completion of phase 1 targeted for the end of 2026. The LLTRWG \nwill continue to monitor the progress of that effort and will work to ensure alignment between \nthe requirements developed through this initiative and applicable NERC reliability standards. \nThe term “large load” has not yet been formally defined across the industry. The requirements \npresented in this document are intended to apply to large computational loads, including \nconventional, AI-training, and crypto mining data centers interconnected to the ISO \ntransmission system."},{"page":6,"startToken":840,"endToken":1193,"text":"Large Load Technical Requirements \n \nPage 5 of 38 \n \nThe requirements presented in this document establish baseline technical expectations for \nlarge loads interconnected to the ISO-controlled grid. Depending on project characteristics, \nelectrical location, system strength, concentration of nearby large loads or inverter-based \nresources (IBRs), and local transmission system conditions including proximity to series-\ncompensated lines, additional or more stringent requirements may be identified through the \nload interconnection study process.1  \nThe LLTRWG also recognizes that industry practices, technologies, and reliability standards \nrelated to large loads continue to evolve, and the requirements presented in this document \nmay be revised or expanded as additional operating experience, technical studies, and \nreliability standards become available.  \nA decision regarding where these requirements will ultimately be documented and enforced—\nwhether through a tariff, ISO Business Practice Manual, utility interconnection handbooks, or \nanother mechanism, as well as whether and to what extent existing customers would be \nrequired to comply with these technical requirements, will be made at a later stage. \nEach section of this document focuses on a specific technical requirement and generally \nincludes the following subsections: \n• \nRequirement – Defines the technical requirement that the large load is expected to \nmeet.  \n• \nNotes – Provides additional clarification, assumptions, or implementation \nconsiderations related to the requirement.  \n• \nTechnical Rationale – Describes the methodology, system studies, engineering \nconsiderations, and technical basis used by the LLTRWG in developing the requirement. \nWhere applicable, this section also explains differences between the proposed \nrequirements and those adopted by other entities.  \n• \nIndustry Practice – Summarizes relevant requirements, guidelines, or practices adopted \nor proposed by other utilities, balancing authorities, reliability organizations, or industry \ngroups. The information provided is not intended to be exhaustive, and industry \nrequirements are continuously evolving. The referenced requirements reflect the \ninformation available to LLTRWG at the time this document was prepared. \n \n \n \n1 The current assignment of responsibilities for the system under the ISO’s operating control gives lead \nresponsibilities for generation interconnection and transmission planning to the ISO, and load interconnections to \nthe utilities. Given the utilities’ lead role in load interconnections, utility federal and state tariffs and state \nregulations govern the study, interconnection, rates, and cost recovery for serving new loads."},{"page":7,"startToken":1193,"endToken":1463,"text":"Large Load Technical Requirements \n \nPage 6 of 38 \n \n2. Proposed Technical Requirements \n2.1. Frequency Ride-Through \nRequirement \nThe frequency ride-through capability requirements are provided in Table 1.  \nTable 1: Frequency Ride-through Capability Requirements \nFrequency (Hz) \nMinimum Ride-through \nRequirement (sec) \n>61.8 \nMay trip \n>61.2 \n299 \n≤ 61.2 and ≥ 58.8 \nContinuous operation \n<58.8 \n299 \n<57.0 \nMay trip \nNotes \n• Frequency measurements shall be taken at the high side of the main power transformer \n(MPT). \n• Frequency calculations shall be based on measurements obtained over an appropriate \ntime window, typically ranging from 3 to 6 cycles. \n• Instantaneous or single-point frequency measurements shall not be used for \ndetermining protection or control actions. \n• Ride-through does not apply when the load trips in response to an ISO/TO-directed \nunderfrequency load shedding program or RAS action. The UFLS and RAS obligation \nsupersedes. \n• The working group is continuing to evaluate appropriate Rate of Change of Frequency \n(RoCoF)-related ride-through requirements for large loads based on system studies, load \ncharacteristics, and industry practices. \nTechnical Rationale \nThe frequency ride-through requirements are intended to prevent unnecessary tripping of large  \nloads during credible system disturbances and to support overall Bulk Electric System (BES) \nreliability. The ISO’s annual frequency response studies, along with additional studies \nperformed by the LLTRWG as part of this initiative, indicate that system frequency across the \nWestern Interconnection is generally robust and experiences relatively limited deviations from \nnominal frequency, even following severe contingency events. For example, the ISO’s annual \nfrequency response assessment includes scenarios involving the simultaneous trip of two Palo \nVerde generating units, which represent among the most significant generation-loss events in \nthe Western Interconnection."},{"page":8,"startToken":1463,"endToken":1526,"text":"Large Load Technical Requirements \n \nPage 7 of 38 \n \nThe study results indicate that adopting frequency ride-through requirements generally \nconsistent with NERC PRC-029 is technically appropriate for the ISO system and provides \nalignment with emerging industry practices across North America.  \nIndustry Practice \n• ERCOT, SPP, MISO, and LIPA have adopted or proposed frequency ride-through \nrequirements that are generally similar to those presented in this document."},{"page":9,"startToken":1526,"endToken":1811,"text":"Large Load Technical Requirements \n \nPage 8 of 38 \n \n2.2. Voltage Ride-Through \nRequirement \nThe voltage ride-through capability requirements are provided in Table 2.  \nTable 2: Voltage Ride-through Capability Requirements \nVoltage  \n(per unit) \nMinimum Ride-through \nRequirement (sec) \n>1.2 \nMay trip \n>1.1 \n2.0 \n≤ 1.1 and ≥ 0.9 \nContinuous operation \n<0.9 \n6.0 \n<0.7 \n3.0 \n<0.5 \n1.2 \n<0.25 \n0.15 \nNotes \n• The voltage base used for per-unit calculations shall be the nominal phase-to-phase or \nphase-to-ground transmission system voltage, as applicable. \n• The applicable voltage for evaluating compliance with Table 2 shall be the maximum or \nminimum fundamental-frequency root mean square (RMS) voltage, measured phase-to-\nphase or phase-to-neutral at the high side of the main power transformer (MPT). \n• Instantaneous trip settings based on voltage measurements with filtering durations \nshorter than one cycle (16.6 milliseconds) are not permissible. \n• At any given voltage value, the large load shall Ride-through unless the time duration at \nthat voltage has exceeded the specified minimum Ride-through duration. If the voltage \nis continuously varying over time, it is necessary to add the duration within each band of \nTables 2 over any 10 second time period. \n• The specified duration in Tables 2 is cumulative over one or more disturbances within \nany 10 second time period. \n• Temporary reductions in active power consumption during and after voltage \ndisturbances could occur due to UPS operation, or transitions to backup generation. The \nLLTRWG is continuing to evaluate and define acceptable levels of temporary power \nreduction and current increase while operating within the ride-through zones. \n• Ride-through does not apply when the load trips in response to an ISO/TO-directed \nundervoltage load shedding scheme or RAS action. The UVLS and RAS obligation \nsupersedes."},{"page":10,"startToken":1811,"endToken":2139,"text":"Large Load Technical Requirements \n \nPage 9 of 38 \n \nTechnical Rationale \nThe voltage ride-through requirements are intended to minimize unnecessary disconnection of \nlarge loads during transmission disturbances and to support reliable BES performance during \nand following system faults and disturbances. \nThe ride-through requirement of 6 seconds for the voltage range 0.7 ≤ V < 0.9 pu is generally \nconsistent with the requirements specified in NERC PRC-029 for IBRs and is based on \nparametric dynamic studies performed on the ISO system. The study results demonstrated that, \ndue to the dynamic characteristics of the load response in certain areas of the ISO footprint, \nvoltage recovery following certain three-phase faults may take 6 seconds or longer to recover \nabove 0.9 pu under specific operating conditions and contingency scenarios. \nAlthough some utilities and balancing authorities have adopted shorter ride-through durations \nfor this voltage range, the LLTRWG concluded that adopting a 6-second ride-through \nrequirement is appropriate for the ISO system to avoid unnecessary tripping of large loads \nduring severe but credible system disturbances. \nThe ride-through requirement of 2 seconds for the overvoltage range 1.1 < V ≤ 1.2 pu is more \nconservative than the corresponding 1-second requirement specified in PRC-029 for IBRs. This \nrequirement reflects the fact that, under the ISO Planning Standards, steady-state transmission \nvoltages may approach 1.1 pu under certain operating conditions. In addition, dynamic studies \nperformed by the LLTRWG indicated that temporary overvoltage conditions above 1.1 pu may \npersist for durations exceeding 1 second following major disturbances or switching events. As a \nresult, a 2-second ride-through capability was determined to be appropriate for large loads \ninterconnected to the ISO-controlled grid. \nIndustry Practice \n• Voltage ride-through requirements vary significantly across utilities, balancing \nauthorities, and system operators due to differences in system characteristics, operating \npractices, and reliability considerations. \n• Figure 1 summarizes voltage ride-through requirements adopted or proposed by several \nentities as of early 2026. These requirements continue to evolve as utilities and \nreliability organizations gain additional operating experience with large loads."},{"page":11,"startToken":2139,"endToken":2159,"text":"Large Load Technical Requirements \n \nPage 10 of 38 \n \nFigure 1: Low Voltage Ride-Through Requirements \n(Source ESIG Presentation, February 11, 2026)"},{"page":12,"startToken":2159,"endToken":2573,"text":"Large Load Technical Requirements \n \nPage 11 of 38 \n \n2.3. Post Fault Active Power Recovery (PFAPR) \nRequirement \nLarge loads shall recover to at least 90% of their pre-disturbance active power level within \n3 seconds after the post-fault voltage at the Point of Interconnection (POI) recovers to 0.9 pu or \ngreater. \nNotes \n• Sustained or repeated reductions in active power after initial recovery are not allowed.  \n• Additional project-specific requirements may be established where studies identify \npotential reliability concerns associated with delayed or coordinated load recovery \nbehavior. \n• The PFAPR requirement applies to the aggregate active power consumed from the \ntransmission system at the POI. \n• If all or part of the large load is required to trip due to RAS action following the fault, the \nlarge load will be required to recover to at least 90% of, their pre-disturbance active \npower level minus the load required to trip due to RAS action, within 3 seconds.  \n• If all or a portion of the large load is required to trip due to RAS operation following a \nfault, the required PFAPR level shall be at least 90% of the remaining pre-disturbance \nload after the RAS-related load reduction, within 3 seconds after the post-fault voltage \nat the POI recovers to 0.9 pu or greater. \nTechnical Rationale \nTo maintain continuity of computational processes during transmission disturbances, many \nlarge load facilities, particularly AI-training data centers, incorporate UPS systems and onsite \nbackup generation. These systems are typically designed to maintain uninterrupted service to \nsensitive computing equipment during voltage disturbances or other grid events. \nAs part of their control strategy, the facility energy management or site control system may \ninterpret a transient voltage disturbance as a sustained voltage drop and transfer all or a \nportion of the facility load from the grid to UPS systems or onsite backup generation. While this \napproach improves the reliability and resiliency of the computational load from the customer \nperspective, it can create reliability concerns for the BES. From the grid perspective, such \nactions appear as a sudden and potentially significant loss of load. \nThe reliability impact becomes more significant when multiple large load facilities are \nelectrically concentrated within the same geographic area or transmission corridor and respond \nsimilarly to system disturbances. Simultaneous or coordinated reductions in grid-supplied load \nfollowing a disturbance can result in undesirable system voltage and frequency response. \nThe PFAPR requirement is intended to minimize these risks by ensuring that large loads restore \ntheir active power consumption following fault clearing and system voltage recovery, within a"},{"page":13,"startToken":2573,"endToken":2657,"text":"Large Load Technical Requirements \n \nPage 12 of 38 \n \ndefined time. Establishing a minimum active power recovery performance helps maintain \npredictable system behavior during disturbances and reduces the risk of adverse interactions \nbetween large loads and the transmission system. \nIndustry Practice \n• ERCOT: Requires restoration of at least 90% of pre-disturbance active power within \n2 seconds. \n• AESO: Specifies a default active power recovery time of 1 second, with the capability to \nadjust the requirement up to 10 seconds depending on system strength and local \nreliability considerations."},{"page":14,"startToken":2657,"endToken":3013,"text":"Large Load Technical Requirements \n \nPage 13 of 38 \n \n2.4. Ramp Rate Limit  \nRequirement \nThe average active power ramp rate of the large load, measured over a rolling 10-minute \ninterval, shall not exceed 20 MW/min. \nNotes \n• One objective of this requirement is to limit the collective impact of large loads on: \no Real-time regulation reserve procurement requirements \no Interconnection frequency variations within the ±0.036 Hz deadband, beyond \nwhich PFR from generators across the Western Interconnection may be \ntriggered. \n• Separate requirements may be established to limit faster load variations associated with \nshort-duration cycling, pulsating load behavior, or oscillatory characteristics of the load. \n• The ramp-rate requirement applies to normal operating conditions, including routine \noperational changes and restoration following outages, but does not apply to automatic \nresponses to faults or disturbances required for equipment protection or fault ride-\nthrough performance. \nTechnical Rationale \nEach Balancing Authority (BA) is responsible for maintaining its Area Control Error (ACE) below \na limit by continuously balancing generation and load within its system. This balancing function \nis primarily achieved through the procurement and dispatch of regulation reserves capable of \nresponding rapidly to short-term changes in system conditions. \nLarge loads, particularly AI-training data centers, can exhibit substantial variations in power \nconsumption over relatively short timeframes. Without appropriate ramp-rate limitations, the \naggregate behavior of these loads could significantly increase the amount of regulation reserve \ncapacity required to maintain reliable system operation. Such impacts could exceed the \nregulation requirements traditionally associated with managing variability from conventional \nload behavior and intermittent generation resources. \nIn addition, rapid changes in load directly affect Interconnection frequency. Gradual changes \ncan typically be managed through normal regulation service response; however, sufficiently \nrapid load changes may exceed the response capability of regulation reserves and frequently \ntrigger PFR from generators throughout the Western Interconnection. Frequent activation of \nPFR can increase mechanical wear on generating equipment and reduce operational flexibility. \nThe proposed ramp-rate limitation is therefore intended to reduce unnecessary triggering of \nPFR, limit excessive regulation reserve requirements, and support predictable system operation \nduring normal load variations. The requirement applies to day-to-day operation of large loads, \nincluding ramping associated with startup, shutdown, restoration following outages."},{"page":15,"startToken":3013,"endToken":3134,"text":"Large Load Technical Requirements \n \nPage 14 of 38 \n \nThe LLTRWG also recognizes that certain large loads may exhibit significant power fluctuations \nover shorter timeframes, including second-to-second variations and oscillatory behavior. As a \nresult, industry practice is evolving toward establishing additional requirements addressing \nshort-duration load cycling and high-frequency power variations to ensure reliable operation of \nthe BES. \nIndustry Practice \n• ERCOT: 20 MW/min \n• ATC: Any active power change greater than 50 MW must be limited to a ramp rate of \nless than 0.5 MW/s (30 MW/min) \n• AESO: 10 MW/min \n• Southern Company: 20 MW/min. In addition, the top quartile (P75) of active power \nramp rate, as averaged across consecutive 1-minute periods, should also not exceed \n20 MW/min."},{"page":16,"startToken":3134,"endToken":3461,"text":"Large Load Technical Requirements \n \nPage 15 of 38 \n \n2.5. Monitoring and Telemetry  \nRequirement \nHigh-resolution monitoring and telemetry equipment, including Phasor Measurement Units \n(PMUs), Digital Fault Recorders (DFRs), and SCADA systems shall be installed at each Main \nPower Transformer (MPT) associated with the large load interconnection.  \nNotes \n• Interconnection studies may identify the need for additional monitoring capabilities \ndepending on reliability risks. \n• PMU and SCADA measurements shall be streamed in real time to the interconnecting \nTransmission Owner (TO). \n• DFR measurements shall be retained for a minimum of 30 days and provided to the TO \nupon request within 10 days. \n• Depending on the results of the interconnection studies, the interconnecting TO may \nrequire additional monitoring, control, or protective systems to maintain BES reliability. \nSuch systems may include automated schemes designed to reduce or disconnect \nportions of the large load during abnormal system conditions. \n \nTechnical Rationale \nThe rapid pace of large load interconnections within the ISO footprint, combined with the \nlimited industry operating experience with such facilities, particularly AI-training data centers, \ncreates a need for enhanced system visibility and high-resolution monitoring capabilities. \nLarge loads may exhibit fast-changing power consumption characteristics, complex interactions \nwith power electronic equipment, and coordinated responses to transmission disturbances that \nmay contribute to unexpected dynamic performance, oscillatory behavior, or other reliability \nconcerns that may not be fully observable through conventional SCADA measurements alone. \nThe installation of high-resolution monitoring equipment, including PMUs, and DFRs, provides \nthe ability to capture dynamic system behavior during both normal operation and disturbance \nconditions. Real-time streaming of monitoring data supports operational awareness, event \nanalysis, oscillation detection, model validation, and identification of abnormal system \ninteractions. These measurements also support post-event engineering analysis and facilitate \nthe development of mitigation measures when reliability concerns are identified. \nThe LLTRWG believes that enhanced monitoring and telemetry capabilities are important to \nensure that any unexpected interactions between large loads and the transmission system can \nbe identified and addressed promptly through automated protection systems, operational \nactions, or future design improvements."},{"page":17,"startToken":3461,"endToken":3555,"text":"Large Load Technical Requirements \n \nPage 16 of 38 \n \nIndustry Practice \n• ERCOT: Requires installation of PMUs, Sequence of Events (SOE) recording equipment, \nand Digital Fault Recorders (DFRs). \n• ATC: Requires monitoring of the aggregate large load facility at sufficient resolution and \nto retain at least 90 days of operational data. \n• AESO: Requires installation of PMUs and real-time streaming of specified synchrophasor \nmeasurements. \n• Southern Company: Requires monitoring equipment, including PMUs, Advanced Digital \nFault Recorders (ADFRs), and Continuous Wave Streaming devices, to support wide-area \noscillation detection at the Point of Connection unless determined otherwise by \nSouthern Company Transmission."},{"page":18,"startToken":3555,"endToken":3897,"text":"Large Load Technical Requirements \n \nPage 17 of 38 \n \n2.6. Modeling Data  \nRequirement \nAttachment A identifies the modeling and technical data that large load interconnection \ncustomers are required to provide to the interconnecting Transmission Owner (TO) to support \nsystem impact studies and reliability assessments. Depending on the project characteristics and \nstudy phase, the TO may require submission of power flow, dynamic, short-circuit, and/or EMT \nmodels and associated technical data. \nNotes \n• The modeling data requirements are generally aligned with the NERC large load \nmodeling data questionnaire and related industry guidance documents. \n• Additional load profile information, control system details, operational characteristics, \nor model data may be required by the interconnecting TO based on the characteristics \nof the load, system conditions, or study results. \n• The TO may require updated or revised models during different phases of the \ninterconnection process, including planning, commissioning, and post-commercial \noperation model validation activities. \n• Submitted models and technical data shall accurately represent the expected steady-\nstate and dynamic performance of the facility, including any load management systems, \nUPS systems, onsite generation, or other control systems that may impact system \nbehavior during normal or disturbance conditions. \n• Where applicable, EMT models shall include sufficient detail to support evaluation of \nfast dynamic interactions, converter and UPS behavior, control system performance, \nharmonic impacts, and other sub-cycle phenomena relevant to system reliability. \nTechnical Rationale \nAccurate modeling data is essential to enable the interconnecting TO and the ISO to perform \nreliable system impact studies and evaluate the potential effects of large loads on the BES. \nDepending on the size, location, and operating characteristics of the project, large loads may \nsignificantly influence steady-state power flows, system dynamics, voltage performance, \nfrequency response, fault behavior, oscillatory performance, and electromagnetic transient \ninteractions. \nThe requested modeling information and supporting technical data enable the TO to perform \ndetailed planning, operational, protection, and reliability studies across multiple simulation \ndomains, including power flow, transient stability, short-circuit, and EMT analysis. Accurate \nmodels are particularly important for evaluating facilities with rapidly varying load behavior, \ncomplex power electronic equipment, UPS systems, onsite generation, or advanced control \nsystems."},{"page":19,"startToken":3897,"endToken":3947,"text":"Large Load Technical Requirements \n \nPage 18 of 38 \n \n \nIn addition, validated and up-to-date models support ongoing planning assessments, \noperational studies, disturbance analysis, and future reliability evaluations as system conditions \nevolve over time.  \nIndustry Practice \nOther entities have established similar load modeling and technical data submission \nrequirements for large load interconnections."},{"page":20,"startToken":3947,"endToken":4288,"text":"Large Load Technical Requirements \n \nPage 19 of 38 \n \n2.7. Commissioning \nRequirement \nLarge load interconnection customers shall provide written commissioning and testing \nprocedures to the interconnecting Transmission Owner (TO) prior to energization and \ncommercial operation for TO’s review and approval. The commissioning process shall include \nverification of load characteristics, validation of applicable models, and demonstration of \ncompliance with the technical requirements specified in this document. \nNotes \nAt a minimum, the commissioning and testing process shall include the following: \n• Validation of load profiles and operational behavior to demonstrate compliance with \napplicable ramp-rate and load variability requirements. \n• Validation of power flow, dynamic, and, where applicable, EMT models used in the \ninterconnection studies. \n• Verification that any protection, control, or remedial action systems designed to reduce \nor disconnect portions of the large load operate as intended. \n• Verification of monitoring and telemetry systems, including PMU, SCADA, DFR, as \napplicable. \n• Submission of commissioning test results, disturbance recordings, and model validation \ndata to the interconnecting TO and ISO upon request. \n• Additional commissioning or performance verification requirements may be established \nbased on project-specific reliability considerations identified during the interconnection \nstudy process. If the interconnection study identifies stability risk, the commissioning \nprocess shall include an EMT model validation exercise using approved simulation tools. \n• If certain validations or performance verifications cannot be completed during the initial \ncommissioning phase, the commissioning and testing procedure document shall identify \nwhich tests are deferred, the schedule for completing those tests, and the basis for \nconcluding that the deferred testing will not adversely impact system reliability or the \nvalidity of the interconnection study assumptions. \n• If the large load facility does not satisfy the applicable commissioning or technical \nrequirements, the interconnecting TO may require corrective actions, operational \nlimitations, additional studies, mitigation measures, or re-validation activities prior to or \nfollowing commercial operation. \nTechnical Rationale \nLarge loads may have a significant impact on the reliable operation of the system. As a result, it \nis important to ensure that the actual operating characteristics of the facility are consistent \nwith the assumptions, models, and performance characteristics used during the \ninterconnection studies."},{"page":21,"startToken":4288,"endToken":4430,"text":"Large Load Technical Requirements \n \nPage 20 of 38 \n \nA coordinated and comprehensive commissioning process provides the opportunity to validate \nfacility performance under actual operating conditions, verify the accuracy of submitted models \nand load data, and confirm that protection, control, and monitoring systems operate as \nintended. This process also helps identify potential discrepancies between expected and actual \nfacility behavior before the project enters normal operation. \nValidation of load profiles, ramp-rate behavior, disturbance response, telemetry systems, and \napplicable power system models improves the accuracy of future planning and operational \nstudies and supports reliable system operation following commercial energization. \nThe commissioning process is also intended to establish sufficient operational visibility to \nsupport ongoing monitoring, event analysis, and future model validation activities. \nIndustry Practice \n• Southern Company: The “Integration Process for Transmission-Connected Large Loads” \nincludes detailed commissioning, testing, monitoring, and performance verification \nrequirements for large load interconnections."},{"page":22,"startToken":4430,"endToken":4438,"text":"Large Load Technical Requirements \n \nPage 21 of 38"},{"page":23,"startToken":4438,"endToken":4689,"text":"Large Load Technical Requirements \n \nPage 22 of 38 \n \n3. Technical Requirements Under Development \nThe LLTRWG continues to evaluate additional technical requirements associated with large \nloads and their potential impact on reliable operation of the system. The following sections \nsummarize technical areas currently under development. \n3.1 Low Frequency Cycling  \nRequirement \nTo be determined.  \nNotes \nThe objective of this requirement is to prevent amplification of inter-area oscillations, avoid \nadverse interactions with generator controls and system damping characteristics, and minimize \nunnecessary activation of balancing and frequency response resources. \nThe following topics are being considered for this requirement: \n• \nMagnitude and duration of low-frequency active power variations \n• \nFrequency-domain characteristics of load oscillations  \n• \nAggregate behavior of geographically concentrated large loads  \n• \nPotential interactions with weak-grid conditions, IBRs, and existing system oscillatory \nmodes. \nTechnical Rationale \nLarge loads, particularly AI-training data centers, may exhibit periodic or oscillatory active \npower behavior over timeframes ranging from several seconds to multiple minutes. If not \nproperly managed, coordinated or sustained low-frequency load cycling could interact with \nexisting electromechanical oscillation modes within the transmission system and potentially \nreduce system damping or amplify inter-area oscillations. \nTraditional load models and operating practices have historically assumed relatively smooth \naggregate load behavior. Additional technical requirements may be necessary to ensure that \nlarge loads do not introduce undesirable oscillatory characteristics into the power system. \nIndustry Practice \n• ATC and SPP: Require active power variations to remain below 25 MW over a 5-second \ninterval. \n• Southern Company: Requires active power variations to remain below 10 MW over a 4–\n6 second interval."},{"page":24,"startToken":4689,"endToken":4744,"text":"Large Load Technical Requirements \n \nPage 23 of 38 \n \n• ERCOT: Have proposed limiting active power variations to less than 10 MW over a 5-\nsecond interval. \n• LIPA: Requires frequency-domain content in the 0.1–5 Hz range to remain below 10 MW \nand content in the 5–55 Hz range to remain below 3.5 MW."},{"page":25,"startToken":4744,"endToken":5000,"text":"Large Load Technical Requirements \n \nPage 24 of 38 \n \n3.2 High Frequency Cycling  \nRequirement \nTo be determined.  \nNotes \nThe objective of this requirement is to prevent adverse interactions between large loads and \ntransmission system, IBRs, synchronous generator shaft systems, and power electronic \ncontrols. \nThe following topics are being considered for this requirement: \n• \nFrequency-domain characteristics of load variations and oscillatory behavior  \n• \nPotential excitation of SSR, SSTI, SSCI, or other oscillatory phenomena  \n• \nInteractions between large loads and IBRs, FACTS devices, HVDC systems, or series-\ncompensated transmission facilities  \n• \nAppropriate Fast Fourier Transform (FFT)-based methodologies, filtering techniques, \naveraging windows, and performance metrics  \n• \nThe aggregate impact of geographically concentrated large loads operating with similar \ncontrol characteristics. \nTechnical Rationale \nLarge loads, particularly AI-training data centers and facilities utilizing high-speed power \nelectronic equipment, may exhibit active power fluctuations across a wide range of \nfrequencies. Such variations may interact with existing oscillatory modes of the transmission \nsystem or excite resonant conditions that could negatively impact system reliability. \nOf particular concern are interactions involving IBRs, series-compensated transmission lines, \nFACTS, HVDC converter controls, and generator shaft torsional modes. Under certain \nconditions, repetitive or sustained high-frequency cycling behavior may contribute to adverse \ndynamic interactions, reduced system damping, equipment stress, or unintended operation of \nprotection and control systems. \nThe reliability risk associated with high-frequency cycling behavior is expected to be system-\ndependent and may vary significantly based on system configuration and operating conditions. \nIndustry Practice \n• ATC, SPP, and MISO: Require system impact studies to demonstrate that large loads do \nnot create adverse reliability impacts on the system."},{"page":26,"startToken":5000,"endToken":5080,"text":"Large Load Technical Requirements \n \nPage 25 of 38 \n \n• Southern Company: Requires the frequency-domain content of the load profile, \ncalculated using FFT analysis, to remain below specified limits across multiple frequency \nbands, including 0.1–0.5 Hz, 0.5–0.8 Hz, 0.8–2 Hz, and 5–55 Hz. \n• LIPA: Requires frequency-domain content in the 0.1–5 Hz range to remain below 10 MW \nand content in the 5–55 Hz range to remain below 3.5 MW."},{"page":27,"startToken":5080,"endToken":5316,"text":"Large Load Technical Requirements \n \nPage 26 of 38 \n \n3.3 Limits on operating in constant power mode \nRequirement \nTo be determined.  \nNotes \nThe following topics are being considered for this requirement: \n• \nThe dynamic behavior of power electronic load controls during voltage disturbance  \n• \nPotential impacts on transmission system voltage recovery and system stability  \n• \nInteractions with IBRs and weak-grid conditions \n• \nThe aggregate effect of multiple large loads operating with similar control \ncharacteristics \n• \nAppropriate operational limitations or control requirements during transient voltage \nevents. \nTechnical Rationale \nMany large loads utilize power electronic interfaces and control systems designed to maintain \nrelatively constant active power consumption over a wide range of operating conditions. During \nvoltage depressions, constant power operation may cause the load to draw increased current \nfrom the transmission system to maintain its active power consumption. \nUnder certain system conditions, this behavior may negatively impact voltage recovery \nfollowing disturbances, increase reactive power demand, reduce system damping, or contribute \nto voltage instability. The aggregate response of multiple large loads operating in constant \npower mode may further amplify these effects. \nThe potential reliability impacts are expected to depend on several factors, including system \nstrength, load composition, control system design, disturbance severity, and the dynamic \ninteractions between large loads and nearby generation resources. \nIndustry Practice \n• ATC and SPP: Do not permit operation in constant power mode during voltage sag \nconditions due to concerns regarding adverse impacts on transmission system reliability \nand voltage recovery performance."},{"page":28,"startToken":5316,"endToken":5581,"text":"Large Load Technical Requirements \n \nPage 27 of 38 \n \n3.4 Power Quality (harmonic, flicker, Rapid Voltage Change, ...)  \nRequirement \nTo be determined.  \nNotes \nThe following topics are being considered for this requirement: \n• \nHarmonic current and voltage distortion  \n• \nVoltage flicker and Rapid Voltage Change (RVC)  \n• \nSubharmonic and interharmonic emissions  \n• \nPower quality impacts associated with rapidly varying loads \n• \nContinuous power quality monitoring and reporting requirements  \n• \nPotential cumulative impacts resulting from geographically concentrated large loads.  \nThe LLTRWG is also evaluating appropriate measurement methodologies, compliance criteria, \nmonitoring requirements, and applicable industry standards for power quality performance. \nTechnical Rationale \nLarge loads, particularly AI-training data centers, may contribute to harmonic distortion, flicker, \nrapid voltage fluctuations, interharmonics, and other waveform abnormalities that may \nadversely affect transmission equipment, customer loads, IBRs, and overall system reliability. \nThe potential impact of power quality disturbances depends on several factors, including facility \nsize, load composition, converter technologies, local system strength, network impedance \ncharacteristics, and the aggregate behavior of nearby large loads and IBRs. \nAs the penetration of large loads increases, the cumulative impact of harmonics and rapidly \nvarying load behavior may become more significant, particularly in electrically weak areas of \nthe system. Continuous monitoring and appropriate technical limits may therefore be necessary \nto ensure acceptable system performance and compliance with applicable reliability and power \nquality standards. \nIndustry Practice \n• ATC, Dominion, AEP, and AESO: Require compliance with IEEE 519-2022 harmonic limits \nat the Point of Common Coupling (PCC), IEEE 1453 flicker and Rapid Voltage Change \n(RVC) limits, and continuous power quality monitoring at the POI. \n• ERCOT and SPP: Are expected to propose similar power quality requirements for large \nloads."},{"page":29,"startToken":5581,"endToken":5589,"text":"Large Load Technical Requirements \n \nPage 28 of 38"},{"page":30,"startToken":5589,"endToken":5876,"text":"Large Load Technical Requirements \n \nPage 29 of 38 \n \n3.5 Power Factor and Dynamic reactive support  \nRequirement \nTo be determined.  \nNotes \nThe following topics are being considered for this requirement: \n• \nSteady-state power factor requirements at the POI  \n• \nDynamic reactive power performance during normal and system disturbance conditions  \n• \nVoltage support capabilities during transmission contingencies and voltage disturbance \nevents  \n• \nCoordination with IBRs and nearby reactive support devices \n• \nReactive power impacts associated with rapidly varying loads  \n• \nThe aggregate impact of geographically concentrated large loads on local and system-\nwide voltage performance.  \nTechnical Rationale \nLarge loads may have a significant impact on transmission system voltage performance and \nreactive power requirements. Depending on their operating characteristics, large loads may \ncontribute to increased reactive power demand, voltage fluctuations, reduced voltage stability \nmargins, and degraded post-disturbance voltage recovery performance. \nMany large loads utilize power electronic equipment, UPS systems, and advanced control \nsystems that may dynamically influence reactive power consumption and voltage behavior \nduring both normal operation and system disturbances. As the penetration of these facilities \nincreases, maintaining acceptable voltage performance and reactive power balance across the \ntransmission system may require additional technical requirements related to steady-state \npower factor operation and dynamic reactive support capabilities. \n Industry Practice \n• Based on section 8.2.3.3 (Voltage Support) of the ISO Tariff: \n“… All Loads directly connected to the CAISO Controlled Grid shall maintain reactive flow at \ngrid interface points within a specified power factor band of 0.97 lag to 0.99 lead. Loads \nshall not be compensated for the service of maintaining the power factor at required levels \nwithin the bandwidth. A UDC interconnecting with the CAISO Controlled Grid at any point \nother than a Scheduling Point shall be subject to the same power factor requirement...”"},{"page":31,"startToken":5876,"endToken":5927,"text":"Large Load Technical Requirements \n \nPage 30 of 38 \n \n• SPP, ATC, LIPA, and AESO: Require operation within a ±0.95 power factor range at the \nPOI. \n• MISO: Has proposed a ±0.95 power factor requirement at the POI. \n• Southern Company: Requires operation within a ±0.90 power factor range at the POI."},{"page":32,"startToken":5927,"endToken":6167,"text":"Large Load Technical Requirements \n \nPage 31 of 38 \n \n3.6 Phase Angle Jump Ride Through  \nRequirement \nTo be determined.  \nNotes \nThe following topics are being considered for this requirement: \n• \nThe ability of large loads to remain connected during transient phase angle shifts \nresulting from system disturbances, switching events, or fault clearing  \n• \nPotential interactions between load control systems, UPS systems, IBRs, and protection \nsystems during phase angle disturbances  \n• \nAppropriate ride-through limits, measurement methodologies, and performance criteria  \n• \nThe aggregate impact of load responses to phase angle disturbances in electrically weak \nareas or regions with high concentrations of large loads. \n• \nUtilizing IEEE-2800 requirement on phase angle jump ride-through as a reference.  \n \nTechnical Rationale \nTransmission system disturbances, fault clearing events, switching operations, and network \nreconfigurations may result in temporary phase angle shifts across the transmission system. \nDepending on the magnitude and rate of the phase angle change, sensitive load control \nsystems, UPS equipment, synchronization controls, or protection systems may respond by \nreducing load, transferring to backup systems, or disconnecting from the grid. \nLarge loads may be particularly sensitive to such disturbances. Coordinated or widespread \nresponses to phase angle jumps could potentially result in sudden changes in active or reactive \npower consumption, undesirable dynamic interactions, or reduced system stability margins. \nIndustry Practice \nIndustry practices and technical requirements related to phase angle jump ride-through for \nlarge loads are currently evolving. The LLTRWG continues to monitor industry developments, \nutility requirements, and emerging reliability standards in this area."},{"page":33,"startToken":6167,"endToken":6451,"text":"Large Load Technical Requirements \n \nPage 32 of 38 \n \n3.7 Protection Requirements  \nRequirement \nTo be determined.  \nNotes \nThe following topics are being considered for this requirement: \n• \nProtection system coordination between large loads and the transmission system  \n• \nVoltage, frequency, and Rate of Change of Frequency (RoCoF)-based protection settings  \n• \nCoordination of load protection systems with ride-through requirements and system \nreliability objectives  \n• \nProtection system behavior during transmission faults, switching events, oscillatory \nconditions, and abnormal system conditions  \n• \nThe use of remedial action schemes, load-shedding schemes, or special protection \nsystems to maintain system reliability  \n• \nThe aggregate impact of coordinated or simultaneous operation of protection systems \nassociated with multiple large loads.  \n• \nFor any customer back up generation including UPS that will only operate when the \nlarge load is isolated from the interconnecting TO System (e.g., in island-mode), the \nlarge load will be required to install interlocks acceptable to the TO to prevent the \ncustomer-owned generation from coming on-line or generating when the large load is \nsynchronized to the TO system. \nTechnical Rationale \nProtection systems associated with large loads can significantly influence transmission system \nperformance during disturbances and abnormal operating conditions. Improperly coordinated \nor overly sensitive protection settings may result in unnecessary or widespread disconnection \nof large loads following transmission faults, voltage depressions, frequency excursions, \noscillatory events, or other system disturbances. \nBecause large loads may represent concentrated demand as an aggregate, simultaneous or \ncoordinated tripping of these facilities could result in sudden load loss, excessive frequency and \nvoltage excursions, and other adverse impacts on reliability. \nIn addition, many large loads utilize advanced control architectures that may introduce complex \ninteractions between facility-level protection systems and transmission system dynamics. \nProtection system coordination is therefore important to ensure that the facility appropriately"},{"page":34,"startToken":6451,"endToken":6520,"text":"Large Load Technical Requirements \n \nPage 33 of 38 \n \ndistinguishes between disturbances that require equipment protection and those for which \ncontinued ride-through operation is necessary to support reliable system performance. \nIndustry Practice \nIndustry practices and technical requirements related to protection systems for large loads \ncontinue to evolve. Utilities, balancing authorities, and reliability organizations are actively \nevaluating appropriate protection coordination requirements, ride-through expectations, and \nremedial action approaches for large load interconnections."},{"page":35,"startToken":6520,"endToken":6759,"text":"Large Load Technical Requirements \n \nPage 34 of 38 \n \n3.8 Other Emerging Technical Requirements  \nRequirement \nTo be determined.  \nNotes \nPotential future areas of evaluation may include, but are not limited to: \n• \nEmerging dynamic performance characteristics associated with large loads \n• \nInteractions between large loads and IBRs, HVDC systems, FACTS devices, and advanced \ntransmission technologies  \n• \nAdvanced monitoring, telemetry, and real-time performance assessment requirements  \n• \nCybersecurity and operational coordination considerations associated with large load \nfacilities  \n• \nAggregated impacts of geographically concentrated large loads on system reliability and \noperational flexibility \n• \nAdditional reliability requirements identified through NERC standards and guideline \ndevelopment activities, disturbance investigations, or industry operating experience. \n• \nCoordinated or simultaneous loss of large loads across multiple facilities resulting from \ncommon-mode IT, communication network, cloud-service, control system, or \ncybersecurity events, rather than transmission system disturbances, may present unique \nreliability risks to the BES. The LLTRWG may evaluate whether additional operational, \ncoordination, monitoring, or performance requirements are necessary to address such \nscenarios.  \n• \nThe interconnecting TO may require updated studies, revised modeling data, or \nadditional operational coordination requirements when significant changes occur to \nfacility configuration, operating characteristics, control systems, or load behavior \nfollowing commercial operation. \nTechnical Rationale \nAs industry practices, technologies, and system conditions continue to evolve, new reliability \nconsiderations may emerge that are not fully addressed by existing planning criteria, operating \npractices, or technical requirements. \nThe large scale, rapid growth, and increasingly dynamic behavior of these facilities may create \nnew operational and planning challenges for the grid."},{"page":36,"startToken":6759,"endToken":6836,"text":"Large Load Technical Requirements \n \nPage 35 of 38 \n \nGiven the evolving nature of these technologies and the limited long-term operating experience \ncurrently available, the LLTRWG believes it is important to maintain flexibility to develop \nadditional technical requirements as necessary to support reliable system operation.   \nIndustry Practice \nMany entities are actively evaluating additional reliability requirements beyond those currently \nestablished, particularly in areas related to dynamic performance, oscillatory behavior, power \nquality, monitoring, protection coordination, and advanced control system interactions."},{"page":37,"startToken":6836,"endToken":7118,"text":"Large Load Technical Requirements \n \nPage 36 of 38 \n \n4. References  \n[1]  NERC Level 3 Computational Load Alert – Essential Action to Industry; Computational \nLoad Modeling, Studies, Instrumentation, Commissioning, Operations, Protection, and \nControl, May 2026 \nhttps://www.nerc.com/globalassets/programs/bpsa/alerts/level-3-computational-load-alert.pdf  \n[2]  NERC Level 2 Large Load Alert –Industry Recommendation; Large Load Interconnection, \nStudy, Commissioning, and Operations, September 2025 \nhttps://www.nerc.com/globalassets/programs/bpsa/alerts/2025/nerc-alert-level-2--large-loads.pdf  \n[3]  NERC Reliability Guideline – Large Loads Reliability Impacts and Recommended \nModeling Practices, May 2026 \nhttps://www.nerc.com/globalassets/who-we-are/standing-\ncommittees/rstc/draft_reliabilityguideline_riskmitigationforemerginglargeloads.pdf  \n[4]  NERC Project 2026-02 – Computational Load Reliability Standards Development \nhttps://www.nerc.com/standards/reliability-standards-under-development/2026-02-computational-loads  \n[5]  NERC White Paper – Assessment of Gaps in Existing Practices, Requirements, and \nReliability Standards for Emerging Large Loads, March 2026 \nhttps://www.nerc.com/globalassets/our-work/guidelines/reliability/white-paper---assessment-of-\ngaps.pdf  \n[6]  NERC – Large Load Modeling Data Questionnaire, March 2026 \nhttps://www.nerc.com/globalassets/who-we-are/standing-committees/rstc/lmwg/data-center-\ninformation-collection-questionnaire.pdf  \n[7] NERC – Large Load Working Group \nhttps://www.nerc.com/who-we-are/committees/reliability-and-security-technical-committee-\nrstc/subcommittees-working-groups-and-task-forces/large-loads-working-group-llwg  \n[8] ESIG – Large Load Working Group \nhttps://www.esig.energy/working-groups/large-loads/  \n[9]  ERCOT – Large Load Working Group \nhttps://www.ercot.com/committees/tac/llwg  \n[10]  Southern Company – Technical Requirements for Transmission Connected Large Loads, \neffective May 1st, 2026 \nhttps://www.oasis.oati.com/woa/docs/SOCO/SOCOdocs/SOCO_Technical_Requirements_for_TCLLs_-\n_v1.4_2026-05-01.pdf  \n[11] American Transmission Company (ATC) –  Transmission System Planning Criteria \nhttps://cdn.misoenergy.org/ATC TO Planning Criteria108210.pdf  \n[12]  NERC Reliability Standards PRC-024-04 – Frequency and Voltage Protection Settings for \nSynchronous Generators, Type 1 and Type 2 Wind Resources, and Synchronous"},{"page":38,"startToken":7118,"endToken":7221,"text":"Large Load Technical Requirements \n \nPage 37 of 38 \n \nCondensers \nhttps://www.nerc.com/globalassets/standards/reliability-standards/prc/prc-024-4.pdf  \n[13]  NERC Reliability Standards PRC-029-1 – Frequency and Voltage Ride-through \nRequirements for Inverter-based Resources \nhttps://www.nerc.com/globalassets/standards/approved-standards/prc/prc-029-1.pdf  \n[14]  California ISO Planning Standards, Effective February 2nd, 2023 \nhttps://www.caiso.com/documents/iso-planning-standards-effective-feb22023.pdf  \n[15]  Alberta Electric System Operator (AESO) – Connection Requirements for Transmission \nConnected Data Centers – Draft for Stakeholder Review, August 22nd, 2025 (Link) \n \n[16]  Long Island Power Authority (LIPA) – Performance Requirements for Large Loads \nConnected to the LIPA System – February 18, 2026 \nfile://T:\\\\ERahimi\\PerformanceRequirementsLargeLoadsConnectedLIPASystem.pdf"},{"page":39,"startToken":7221,"endToken":7358,"text":"Large Load Technical Requirements \n \nPage 38 of 38 \n \n5. Acronym Definitions \n  \nAcronym \nDefinition \nACE \nArea Control Error \nADFR \nAdvanced Digital Fault Recorder \nBA \nBalancing Authority \nBES \nBulk Electric System \nCAISO \nCalifornia Independent System Operator \nDFR \nDynamic Fault Recorder \nEMT \nElectromagnetic Transient \nESIG \nEnergy Systems Integration Group \nFACTS \nFlexible AC Transmission Systems \nFFT \nFast Fourier Transform \nHVDC \nHigh-Voltage Direct Current \nIBR \nInverter-Based Resource \nLLTRWG \nLarge Load Technical Requirements Working Group \nMPT \nMain Power Transformer \nPCC \nPoint of Common Coupling \nPFAPR \nPost-Fault Active Power Recovery \nPFR \nPrimary Frequency Response \nPMU \nPhasor Measurement Unit \nPOI \nPoint of Interconnection \nRMS \nRoot Mean Square \nRoCoF \nRate of Change of Frequency \nRVC \nRapid Voltage Change \nSCADA \nSupervisory Control and Data Acquisition \nSOE \nSequence of Events \nSSR \nSubsynchronous Resonance \nSSCI \nSubsynchronous Control Interaction \nSSTI \nSubsynchronous Torsional Interaction \nTO \nTransmission Owner \nUPS \nUninterruptible Power Supply"}],"sections":[{"p":1,"at":0,"title":"Attachment D – Technical Working Group Proposal","method":"printed heading","endPage":3,"endAt":55,"startToken":0,"endToken":69},{"p":3,"at":55,"title":"Table of Contents","method":"printed heading","endPage":39,"endAt":1087,"startToken":69,"endToken":7358}]}