{"document":{"slug":"rec-20261116-5345","title":"GridLiance West - Response to Show Cause Order EL26-71","issued":"2026-11-16","accession":"20261116-5345","docket":"ER27-533-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"GridLiance West LLC","kind":"tariff filing","file":"sources/filings/text/20261116-5345_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5345","tier":"record","sha256":"4721be916383d5ae05a9b6ff911ea3b7bacbb76b380935b9c3600fee936030a8","pages":25,"tokens":10831,"emptyPages":[],"textThemes":["study","cost","colo","credit"]},"pages":[{"page":1,"startToken":0,"endToken":348,"text":"2000 Pennsylvania Avenue NW \nSuite 6000 \nWashington, DC 20006 \n202-298-1800 \n \nMeghan O’Brien \n202-298-1800 \nmobrien@vnf.com \n \n \nNovember 16, 2026 \n \nVIA E-TARIFF FILING \n \nDebbie-Anne A. Reese \nSecretary \nFederal Energy Regulatory Commission \n888 First Street, NE  \nWashington, DC 20426 \n \n \nRe: \nGridLiance West LLC \n \n \nDocket Nos. ER27-___-000 and EL26-71-000 \n \n \nResponse to Show Cause Order \n \nDear Secretary Reese: \n \n \nPursuant to section 205 of the Federal Power Act (“FPA”),1 Part 35 of the Federal Energy \nRegulatory Commission’s (the “Commission”) regulations and Rules 209 and 213 of the \nCommission’s Rules of Practice and Procedure,2 GridLiance West LLC (“GridLiance West”) \nrespectfully submits this response to the Commission’s Show Cause Order issued pursuant to \nsection 206 of the FPA on June 18, 2026, in Docket No. EL26-71-000 directing the California \nIndependent System Operator Corporation (“CAISO”) and Participating Transmission Owners \n(“PTOs”) in CAISO to show cause why their tariffs are just and reasonable and not unduly \ndiscriminatory or preferential, or in the alternative to explain the necessary changes to remedy \nthe Commission’s identified concerns.3  In the Show Cause Order, the Commission also \nencouraged a response in the form of a section 205 filing proposing tariff revisions remedying \nthe concerns identified in the Show Cause Order.4  \n \nIn the instant filing, GridLiance West proposes revisions to its Transmission Owner Tariff \n(“GridLiance West Tariff”)5 and supporting explanations in response to the Show Cause Order to \nremedy the concerns identified therein.  GridLiance West’s proposed tariff revisions are just and \n \n1  \n16 U.S.C. § 824d. \n2  \n18 C.F.R. §§ 385.209, 385.213(a). \n3  \nCal. Indep. Sys. Operator Corp., 195 FERC ¶ 61,214, at P 3 (2026) (“Show Cause Order”). \n4  \nId. at P 34. \n5  \nThe GridLiance West Tariff has been accepted by the Commission.  GridLiance W. Transco, LLC, 158 FERC ¶ \n62,136 (2017); GridLiance W. LLC, 167 FERC ¶ 61,130 (2019); GridLiance W. Transco, LLC, Docket No. ER17-\n706-005 (Sep. 18, 2018) (delegated letter order); GridLiance W. LLC, Docket Nos. ER18-2206-000 and -001 (Sep. \n18, 2018) (delegated letter order); GridLiance W. LLC, Docket No. ER19-191-000 (Dec. 11, 2018) (delegated letter \norder)."},{"page":2,"startToken":348,"endToken":743,"text":"2 \nreasonable and not unduly discriminatory or preferential, and resolve the Commission’s \napplicable preliminary findings in the Show Cause Order.  GridLiance West also explains how \ncertain aspects of the Show Cause Order are not applicable to GridLiance West due to its role as \na Non-Load-Serving Entity PTO (“Non-LSE PTO”).6  Thus, GridLiance West requests that the \nshow cause proceeding be terminated with respect to GridLiance West.  \nFurther, GridLiance West respectfully requests a 30-day comment period on this filing.  \nGridLiance West also respectfully requests that the Commission accept the amendments \nproposed herein effective February 16, 2027. The requested dates align with those requested by \nCAISO.  \n \nI. \nBACKGROUND  \nA. \nGridLiance West \n \nGridLiance West operates transmission facilities within CAISO. GridLiance West is a \nDelaware limited liability company and a wholly owned subsidiary of NextEra Energy \nTransmission, LLC. GridLiance West owns and operates the High Voltage Transmission System \n(“HVTS”) previously owned by Valley Electric Transmission Association, LLC, a wholly owned \nsubsidiary of Valley Electric Association, Inc. The HVTS consists of approximately 165 miles of \n230-kV transmission lines and related substation infrastructure that runs through rural Southern \nNevada. The HVTS has been incorporated into the CAISO-controlled grid, and GridLiance West \nis a Non-LSE PTO in CAISO. \n \n \nGridLiance West recovers its transmission revenue requirement (“TRR”) through a \nCommission-approved formula rate under the GridLiance West Tariff, which is invoiced and \ncollected through the CAISO Access Charge rates under Section 26 of the CAISO Open Access \nTransmission Tariff (“CAISO Tariff”).  As a Non-LSE PTO under the CAISO Tariff and \nTransmission Control Agreement,7 GridLiance West serves no retail load.8 \nB. \nShow Cause Order \n \nOn June 18, 2026, the Commission initiated a show cause proceeding against CAISO and \nthe PTOs pursuant to section 206 of the FPA.  The Show Cause Order directed CAISO and the \nPTOs to explain why the CAISO Tariff and the Transmission Owner Tariffs of the PTOs (“PTO \nTariffs”) remain just and reasonable and not unduly discriminatory or preferential without certain \ntariff provisions addressing:9  \n \n \n6  \nCAISO Tariff, App. A (defining Non-Load-Serving Participating TO).   \n7  \nCAISO Rate Schedules, Amended and Restated Transmission Control Agreement.   \n8  \nGridLiance West Tariff § 1 (stating that GridLiance West is a Non-LSE PTO and does not provide retail electric \nservice to End-Use Customers); id. § 3.66 (definition of “Non-Load-Serving Participating TO”); see also CAISO \nTariff, App. A (Non-LSE PTO). \n9  \nShow Cause Order at P 31."},{"page":3,"startToken":743,"endToken":1179,"text":"3 \na) the application process, study procedures, and ongoing operational requirements that \napply to Eligible Customers10 seeking transmission service on behalf of Large Loads; \nb) additional transparency concerning the network upgrade11 costs to provide transmission \nservice to Eligible Customers on behalf of Large Loads; and a pro forma cost recovery \nagreement between CAISO, the relevant transmission owner, and the Eligible Customer \ntaking transmission service on behalf of the Large Load to mitigate the risk of cost \nshifting among transmission customers, and a mechanism to ensure such payments are \nappropriately credited toward transmission owners’ TRRs consistent with the \nCommission’s cost-of-service regulations; \nc) the rates, terms, and conditions of service that apply to co-location arrangements; \nd) transmission services that reflect Eligible Customers taking transmission service on \nbehalf of co-located loads, load with behind the meter generation, and flexible Large \nLoads that are willing and able to limit their use of the transmission system under certain \nconditions;12 and \ne) the rates, terms, and conditions of service applicable to interconnection customers serving \nelectrically proximate Large Load or co-located load. \nAlternatively, respondents may explain what changes to their tariffs would remedy the identified \nconcerns if the Commission were to determine that the tariffs have in fact become unjust and \nunreasonable or unduly discriminatory or preferential and proceeds to establish a replacement \ntariff.13 \nC. \nMotion for Abeyance \n \nOn August 3, 2026, pursuant to Rule 212 of the Commission’s Rules of Practice and \nProcedure, CAISO and the joint PTOs, which included GridLiance West, each filed motions to \nhold the above-referenced show cause proceeding in abeyance for 90 days, pending completion \nof CAISO’s stakeholder proceedings and development of the companies’ respective FPA section \n205 filings to address the Commission’s preliminary findings in the Show Cause Order \n \n10  GridLiance West Tariff § 3.20 (definition of “Eligible Customer”). \n11  The Show Cause Order uses the term network upgrades throughout the order to refer to modifications or \nadditions to transmission-related facilities that are integrated with and support the overall transmission system.  See \nShow Cause Order at P 3 n.13 (citing pro forma OATT § 1.27 (Definitions – Network Upgrades)).  CAISO’s current \ndefinition of Network Upgrades applies only to additions, modifications, and upgrades required to accommodate the \nInterconnection of generating facilities.  Id. (citing CAISO Tariff, App. A (Definitions), Network Upgrades (0.0.0)). \n12  For purposes of the Show Cause Order, “flexible” Large Loads are a subset of Large Loads that are not co-\nlocated with generation but are willing and able to limit their energy withdrawals from the transmission system \nunder certain conditions.  See id. at P 3 n.14. \n13  Id. at P 3."},{"page":4,"startToken":1179,"endToken":1622,"text":"4 \n(“Abeyance Motions”).14  The Commission granted the Abeyance Motions and held this \nproceeding in abeyance, in full, including responses to the Show Cause Order and briefing \nquestions, for 90 days.15  \n \nII. \nGRIDLIANCE WEST’S PROPOSED TRANSMISSION OWNER TARIFF \nREVISIONS \n \nThe proposed GridLiance West Tariff revisions are just and reasonable and not unduly \ndiscriminatory or preferential.  The proposed revisions establish an application process, study \nprocedures, operational requirements, and creditworthiness and financial security requirements \napplicable to requests by Eligible Customers seeking to interconnect a Large Load to the \nGridLiance West transmission system.  The revisions are designed to consistently evaluate the \nreliability, operational, and planning impacts of proposed Large Loads, identify and allocate \nresponsibility for any Direct Assignment Facilities, Reliability Upgrades, and other Network \nUpgrades, and mitigate the risk of cost shifting associated with the Interconnection and service \nof Large Loads.  The proposed revisions provide transparency and certainty regarding the \ninformation, studies, agreements, and credit and financial security commitments required from \nEligible Customers seeking transmission service on behalf of Large Loads.16  The proposed \namendments to the GridLiance West Tariff fall into the following categories: \n(1) \nNew and revised defined terms in Section 3 of its GridLiance West Tariff, \nincluding definitions of Large Load, Flexible Interim Load Interconnection \n(“FILI”) Service, Interconnection Facilities, Point of Interconnection, Network \nUpgrades, Site Control, Gross Load, Transmission Revenue Requirement, and \nReliability Upgrade; \n(2) \nRevisions to Section 5 of its GridLiance West Tariff to clarify Gross Load \nreporting associated with Large Load, consistent with the CAISO Tariff; \n(3) \nRevisions to Sections 8.1 and 10.1 through 10.17 of its GridLiance West Tariff to \nestablish an interconnection application process, readiness requirements, and \nstudy procedures specific to Large Load interconnections; \n(4) \nRevisions to Sections 8.1.5.1, 10.12, 10.17, and 16.12 of its GridLiance West \nTariff to establish operational and reliability requirements for Large Loads; \n(5) \nAdditions to Section 10.18 of the GridLiance West Tariff to establish rates, terms, \nand conditions of service applicable to co-located Large Load and FILI Service; \n \n14  Cal. Indep. Sys. Operator Corp., Motion for Abeyance of the California Independent System Operator \nCorporation, Docket No. EL26-71-000 (Aug. 3, 2026); Cal. Indep. Sys. Operator Corp., Request for Abeyance of \nSouthern California Edison Company et al., Docket No. EL26-71-000 (Aug. 3, 2026). \n15  Cal. Indep. Sys. Operator Corp., 196 FERC ¶ 61,131, at P 13 (2026). \n16  GridLiance West developed the proposed revisions herein in a good-faith effort to align with CAISO’s proposed \ntariff revisions, and to the extent practicable given the parallel development of the PTOs’ filings and GridLiance \nWest’s status as a Non-LSE PTO, with the approaches of the other CAISO PTOs."},{"page":5,"startToken":1622,"endToken":2118,"text":"5 \n(6) \nInclusion of cost recovery, creditworthiness, and financial security provisions in \nSections 10.11.2, 10.17.2, and 13.2.1, and including a pro forma Cost Recovery \nAgreement as a new Attachment A to the GridLiance West Tariff for the purpose \nof protecting against cost shifting and increasing transparency as to the Network \nUpgrade costs for Large Load interconnection; and \n(7) \nAdoption of transition provisions in Section 10.20 to protect existing and ongoing \ncommercial arrangements for Large Loads that are operational or have a \nCompleted Interconnection Application before February 16, 2027. \nGridLiance West’s proposed revisions are tailored to its status as a Non-LSE PTO, are \ncoordinated with and consistent with proposed CAISO Tariff revisions and satisfy the Show \nCause Order requirements applicable to a Non-LSE PTO.  GridLiance West has also \nincorporated certain conforming and ministerial revisions, such as correcting punctuation and \napplying consistent usage of terms.  Accordingly, GridLiance West respectfully submits that the \nproposed tariff revisions are just and reasonable, not unduly discriminatory or preferential, and \nshould be accepted by the Commission under section 205 of the FPA, effective as requested.  \nGridLiance West further requests that the Commission terminate the show cause proceeding with \nrespect to GridLiance West upon acceptance of the proposed tariff revisions. \nA. \nLarge Load Interconnection Process \nIn the Show Cause Order, the Commission made a preliminary finding that the CAISO \nTariff and PTO Tariffs appear to be unjust and unreasonable because they lack clear and \nconsistent provisions with respect to the application and study process for Eligible Customers \nseeking transmission and interconnection service on behalf of Large Loads.17  The GridLiance \nWest Tariff establishes, in Sections 8.1 and 10, a defined and time-limited interconnection \nprocess for Large Loads with specific application, readiness, study, and operational requirements, \nand it clarifies how a Large Load interconnected to GridLiance West’s facilities obtains \ntransmission service over the CAISO Controlled Grid.  Elements of this proposal include the \nfollowing tariff improvements for the integration of Large Loads. \n1. \nDefinition of Large Load   \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff and PTO Tariffs appear to be unjust and unreasonable because they \nlack a definition of Large Load sufficient to capture loads that present the unique challenges \ndescribed in the Show Cause Order.18 \nGridLiance West Solution:  In response to the Commission’s finding, GridLiance West \nproposes to define a Large Load as “[a]n End-User located at a single site behind one or more \nPoints of Interconnection to the CAISO Controlled Grid, and that has a peak load of 50 MW or \n \n17  Show Cause Order at PP 38, 49, 58.  Citations herein to the “GridLiance West Tariff” refer to the revised \nGridLiance West TO Tariff included as Appendices A and B to this filing.  Citations to the “CAISO Proposed Tariff” \nrefer to the tariff revisions CAISO is submitting contemporaneously in response to the Show Cause Order. \n18  Show Cause Order at PP 56, 57."},{"page":6,"startToken":2118,"endToken":2652,"text":"6 \ngreater.”19 This definition is identical to the definition CAISO proposes to add to Appendix A of \nthe CAISO Tariff, and adopts the 50 MW threshold the Commission identified as reasonable.20  \nGridLiance West has also adopted CAISO’s approach of not excluding co-located loads from the \ndefinition of Large Load to ensure alignment between the two tariffs. \n2. \nApplication and Study Procedures \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff and PTO Tariffs appear to be unjust and unreasonable because they \nlack clear and consistent provisions addressing the application process and study procedures for \nEligible Customers to request transmission service on behalf of Large Loads.21  The Commission \nindicated that such processes should clarify that applications be accepted on a rolling basis; \nrequire a non-refundable application fee as well as staged readiness requirements; and specify \nthe information and data requirements to be submitted with an application.22 \nGridLiance West Solution:  The proposed tariff revisions leverage GridLiance West’s \nexisting application and study processes while identifying the additional procedures applicable to \nLarge Loads due to their unique operational requirements and reliability impacts on the \ntransmission system.  GridLiance West submits that this approach promotes transparency and \nadministrative efficiency by providing a single, integrated framework for Large Load \ninterconnection requests under the GridLiance West Tariff.  This is responsive to the Show Cause \nOrder’s concern regarding the lack of specificity for Large Loads and their unique operational \ncharacteristics and requirements. \nGridLiance West’s proposed tariff revisions establish the applicable provisions for \nEligible Customers requesting service on behalf of Large Loads (as defined in the GridLiance \nWest Tariff).  First, revised Section 8.1 explicitly extends GridLiance West’s obligation to \ninterconnect to entities eligible to request interconnection pursuant to FPA section 210(a) and \nEligible Customers, including Large Loads owned or served by a third party.  Because \nGridLiance West is a Non-LSE PTO with no retail customers, a Large Load connecting directly \nto GridLiance West’s facilities may not qualify as an “Eligible Customer” in certain instances.  \nGridLiance West therefore proposes, in new Section 10.2, a voluntary offer of unbundled retail \ntransmission service, where consistent with state law, so that Large Loads can request \nInterconnection and be studied under the GridLiance West Tariff as the Show Cause Order \ncontemplates.23 Second, revised Section 10.1 requires that a Large Load Interconnection be \nrequested pursuant to Section 10 of the GridLiance West Tariff and comply with Section 25.7 of \n \n19  GridLiance West Tariff § 3.52 (definition of “Large Load”). \n20  CAISO Proposed Tariff, App. A (definition of “Large Load”); Show Cause Order at P 57. \n21  Show Cause Order at PP 56, 58. \n22  Id. at P 58. \n23  Id. at P 38 & n.117; see also id. at P 43 & n.123. See GridLiance West Tariff § 3.20 (definition of “Eligible \nCustomer”), id. § 10.2.  The offer covers only Interconnection and associated access to the CAISO Controlled Grid \nconsistent with the CAISO Tariff.  It does not include the sale of Energy, distribution service, or scheduling or \nsettlement in the CAISO Markets, and it is available on a non-discriminatory basis to all End-Use Customers on \nGridLiance West’s facilities, not only Large Loads."},{"page":7,"startToken":2652,"endToken":3211,"text":"7 \nthe CAISO Tariff.24  GridLiance West affirms that under the GridLiance West Tariff, applications \nare accepted on a rolling basis, and revised Section 10.4 requires GridLiance West to timestamp \neach Large Load Interconnection Application to establish study priority on a rolling basis.  \nConsistent with the Commission’s concern that the tariffs specify which entity is \nresponsible for the study, GridLiance West is proposing revisions to Sections 10.1 and 10.4 to \nclarify that the Eligible Customer is the entity that requests Interconnection on behalf of a Large \nLoad.25 GridLiance West, as the interconnecting PTO, will perform the System Impact Study and \nFacilities Study for the Eligible Customer taking transmission service on behalf of a Large Load \npursuant to Section 10.26  As part of its study obligations, GridLiance West will apprise CAISO \nof Large Load interconnections through its inputs to the Base Case, Interconnection Studies, and \nthe Transmission Planning Process.27  Prior to energization of any Large Load, GridLiance West \nmust provide CAISO the information required by Section 25.7.1 of the CAISO Tariff, and the \nEligible Customer must provide that information to GridLiance West and notify GridLiance West \nof any material changes within 10 Business Days.28  \nFurthermore, GridLiance West proposes new Section 10.5.1 to clarify additional \napplication requirements for Large Load interconnections.  Specifically, an Eligible Customer \nseeking to interconnect a Large Load must submit: (i) the Large Load’s ramp schedule, \nidentifying load additions over time and maximum planned load; (ii) a site plan; (iii) \ndocumentation of the local, state, and federal permits and regulatory approvals necessary to \ndevelop the Large Load; (iv) documentation demonstrating Site Control; (v) a single-line \nelectrical diagram; (vi) information on any other Interconnection requests made on behalf of the \nsame Large Load or its affiliates; (vii) whether the Large Load intends to request Partial Interim \nService or FILI Service; and (viii) for a Large Load co-located with a Generating Facility, \ninformation sufficient for GridLiance West to ensure compliance with Sections 25.1.1, 25.7.5, \nand 25.7.6 of the CAISO Tariff.  Because Section 10.4 requires every Interconnection \nApplication to be copied to CAISO, Section 10.5.1(vi) requires disclosure of other pending \nrequests on behalf of the same Large Load to CAISO, as the Commission contemplated.29  \nGridLiance West and CAISO, as applicable, must determine whether an application is complete \nwithin ten (10) Business Days under Section 10.6. \nAn applicant must pay a $5,000 nonrefundable Large Load Interconnection Application \nfee.30  At the time of application, they must provide site plans, demonstration of Site Control \n \n24  GridLiance West Tariff §§ 8.1, 10.1; CAISO Proposed Tariff § 25.7 (providing that “End Users, including Large \nLoads, interconnect to the CAISO Controlled Grid pursuant to PTO and retail tariffs”). \n25  GridLiance West notes that there are circumstances in which the Large Load could itself be the Eligible \nCustomer, in which case the Large Load would be requesting interconnection on its own behalf.   \n26  GridLiance West Tariff §§ 10.12, 10.16; Show Cause Order at PP 38 & n.117, 39 & n.118, 51. \n27  GridLiance West Tariff § 10.3. \n28  Id. §§ 8.1.5(v), 10.3. \n29  Show Cause Order at P 58. \n30  GridLiance West Tariff § 10.5; see also CAISO Tariff, App. KK § 3.5.1.1 (Interconnection Study Deposit)."},{"page":8,"startToken":3211,"endToken":3749,"text":"8 \n(which is newly defined to ensure control of the site), and receipt of necessary permits.31  These \nrequirements will ensure that interconnection applications are real, concrete, and nonspeculative.  \nFurthermore, GridLiance West proposes that, at the Large Load System Impact Study phase, the \nEligible Customer must provide a refundable study deposit of: (a) $35,000 plus $1,000 per MW \nfor Interconnection Applications less than 80 MW; (b) $150,000 for Interconnection Applications \ngreater than or equal to 80 MW but less than 200 MW; or (c) $250,000 for Interconnection \nApplications greater than 200 MW.32 The refundable study deposit amounts are consistent with \nthose required in CAISO’s generator interconnection process.  At the Facilities Study phase, the \nEligible Customer must pay the estimated cost of the Facilities Study, and, before energization, \namongst other requirements, it must execute the Interconnection Agreement and pro forma Cost \nRecovery Agreement, and post all required financial security (Sections 10.17.2, 8.1.5.1(viii), and \n13.2.1).  These readiness requirements thus escalate at distinct phases throughout the study \nprocess, consistent with the Show Cause Order directives.33  An applicant that withdraws from \nthe process at any phase must reimburse GridLiance West for all costs reasonably incurred and \nmay be responsible for the cost of restudying later-queued applicants.  \nFor a Large Load Interconnection, the System Impact Study must evaluate the Large \nLoad’s operational characteristics, including its ramp schedule, its performance during system \ndisturbances, and any ability to limit its withdrawals from the CAISO Controlled Grid, consistent \nwith Section 25.7.1 of the CAISO Tariff.  The PTO will evaluate impacts to the transmission \nsystem using power flow and short circuit analyses, and any other analyses that may be \nappropriate including Electromagnetic Transient studies where warranted.  The completed \nSystem Impact Study will include a non-binding, good-faith estimate of the cost of Direct \nAssignment Facilities and Network Upgrades needed to accommodate the request and the time \nrequired to construct them, which the Facilities Study then refines.  GridLiance West may \nrequest additional information, data, or models reasonably needed for the study, including \nmodels suitable for Electromagnetic Transient studies.  The request then proceeds through \nGridLiance West’s existing Facilities Study procedures, which refine the facilities design and the \ncost and schedule estimates for incorporation into the Interconnection Agreement. \n3. \nOperational and Reliability Requirements  \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff and PTO Tariffs appear to be unjust and unreasonable because they \nlack appropriate provisions regarding the ongoing operational requirements that will apply to \ntransmission customers serving Large Loads.34  The Commission further highlighted the lack of \ndetail on data available to CAISO regarding interconnected Large Loads for monitoring and \nreliability purposes, the lack of language enabling CAISO to remotely disconnect Large Loads \n \n31  A site subject to a development moratorium or other governmental restriction that prohibits the proposed use \ndoes not satisfy the Site Control requirement unless the restriction has been lifted or the applicant has obtained all \nnecessary approvals, exemptions, or variances. \n32  GridLiance West Tariff § 10.11.2; see also CAISO Tariff, App. KK § 3.5.1.1. \n33  Show Cause Order at PP 55, 58. \n34  Id. at PP 56, 59, 63."},{"page":9,"startToken":3749,"endToken":4176,"text":"9 \nvia installed equipment, the absence of specified ramp rate, ride-through, and control \ntechnologies or protection systems required.35  \nGridLiance West Solution:  It is GridLiance West’s understanding that CAISO is \nproposing changes to Section 25.7.1 of the CAISO Tariff to provide substantial additional clarity \nregarding ongoing operational requirements for Eligible Customers serving Large Loads, \nincluding Frequency Ride-Through, Voltage Ride-Through, Post-Fault Active Power Recovery, \nand Ramp-Rate Limitation requirements.  Accordingly, GridLiance West’s proposed Section \n10.17 specifies that any Large Load Interconnection Agreement will require compliance with \nSection 25.7.1 of the CAISO Tariff, and proposed Section 10.3 requires GridLiance West to \nprovide the information required by Section 25.7.1 to CAISO prior to energization of the Large \nLoad.  This approach will ensure that Large Load operational requirements remain current with \nCAISO standards and provide transparency and regularity of operational standards that will \nsupport reliable operation of the overall grid.   \nGridLiance West also proposes a series of additional operational requirements mirroring \nCAISO Tariff measures, specifically:  \n Following proposed CAISO Tariff Section 25.7.4 by requiring the Eligible \nCustomer, Large Load, Scheduling Coordinator, and GridLiance West to comply \nwith any CAISO, Regional Entity, or Reliability Coordinator data request after a \ndisturbance or other reliability event involving a Large Load (Section 16.12); \n Ensuring visibility into Large Load operations by extending proposed CAISO \nTariff Section 25.7.3 requirements for the Scheduling Coordinator for each Large \nLoad to provide daily and hourly forecasts, material real-time deviations, outage \ninformation, and real-time telemetry (Sections 8.1.5.1(iii) and 10.17); and \n Following proposed CAISO Tariff Sections 25.7.1.1, 25.7.1.2, 25.7.1.3, and \n25.7.1.4, by requiring Large Load to meet all frequency ride-through \nrequirements, voltage ride through requirements, post-fault active power recovery \nrequirements, and ramp rate limitations established therein (Section 8.1.5.1(x)). \nFinally, GridLiance West proposes requirements for installation and maintenance of the \nequipment required to disconnect or otherwise isolate the Large Load (Sections 8.1.5.1(vi) and \n10.17), with those costs directly assigned to the applicant to avoid cost shifting to transmission \ncustomers (Section 8.1.2). \n4. \nAlternative Transmission Technologies   \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff and PTO Tariffs appear to be unjust and unreasonable because they \nlack clear and consistent provisions requiring the evaluation of alternative transmission \ntechnologies as potential solutions to an Eligible Customer’s request for service on behalf of a \n \n35  Id. at P 63."},{"page":10,"startToken":4176,"endToken":4643,"text":"10 \nLarge Load,36 or requiring an explanation to the Eligible Customer why alternative transmission \ntechnologies are not feasible or would not result in lower costs or a faster timeline \naccommodating the request.37  \nGridLiance West Solution:  The proposed revisions to Section 10.12.1 commit \nGridLiance West to considering alternative transmission technologies in the System Impact \nStudy for every Large Load Interconnection Application, without the need for a request from the \nEligible Customer.  If GridLiance West selects traditional Network Upgrades instead, it must \ndemonstrate why alternative transmission technologies are not feasible or would not result in \nlower costs or a faster timeline for accommodating the request.38  This provision is consistent \nwith the proposed revision to CAISO Tariff Section 24.1, which extends CAISO’s consideration \nof alternative transmission technologies to Large Loads and contemplates the inclusion of similar \nlanguage in the PTO Tariffs. \n5. \nStudy Process Timeline \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the study processes could culminate in a report to the Eligible Customer describing \nthe Network Upgrades necessary to accommodate the service request as well as a non-binding \ngood-faith estimate of the cost and the time to construct such facilities, which should take no \nmore than 60-90 days calendar days to complete.39  \nGridLiance West Solution:  GridLiance West proposes the adoption of revised Section \n10.12 and 10.12.1 to its tariff requiring that a System Impact Study for a Large Load provide a \nnon-binding, good-faith estimate of the cost of Direct Assignment Facilities and Network \nUpgrades needed to accommodate the request and a similar good-faith time estimate required to \nconstruct them.  Following the System Impact Study, pursuant to Section 10.16 the Facilities \nStudy will refine those estimates leading into the Interconnection Agreement process.40  The \nreport will be available following the System Impact Study, consistent with the Show Cause \nOrder directive.  \nGridLiance West also recognizes the need for timely progression of required studies.  \nAccordingly, the proposed GridLiance West Tariff revisions shorten the timeline for \ninterconnection studies at each step of the process to the maximum extent achievable (Sections \n10.8 - 10.12).  Under the proposed Large Load study procedures, GridLiance West must notify \nthe applicant whether a System Impact Study is required within ten (10) Business Days of the \nCompleted Application Date and must tender a System Impact Study Agreement within ten (10) \nBusiness Days of receipt of the Completed Interconnection Application.  The applicant must \nexecute that agreement within ten (10) Business Days and, for a Large Load Interconnection, \nremit a study deposit together with financial security drawable to cover System Impact Study \n \n36  Id. at P 60. \n37  Id. at P 61. \n38  GridLiance West Tariff § 10.12.1. \n39  Show Cause Order at P 62. \n40  GridLiance West Tariff § 10.16."},{"page":11,"startToken":4643,"endToken":5094,"text":"11 \ncosts and, if necessary, Facilities Study costs.  GridLiance West must complete the System \nImpact Study no later than ninety (90) Calendar Days after the Completed Application Date.  \nThis 90-day timeline runs from the Completed Application Date, not from execution of the \nSystem Impact Study Agreement, and therefore includes the time for the System Impact Study \nAgreement and deposit steps.  The result of this proposed schedule is the initiation and \ncompletion of a System Impact Study within the 60-90 calendar day range that the Commission \nidentified as reasonable.  \n \nThis proposed structure is consistent with the study process the Commission accepted for \nSouthwest Power Pool, Inc.’s (“SPP”) High Impact Large Loads (“HILL”).  For that process, \nSPP must complete its HILL Delivery Point Study and issue a study report within 90 calendar \ndays after receiving the executed study agreement, study data, and deposit.41  That study uses \npower flow and short circuit analyses; SPP then performs an Electromagnetic Transient study \nonly when those analyses identify system weaknesses caused by the Large Load, similar to \nGridLiance West’s Large Load System Impact Study process.42  The HILL Delivery Point Study \nworks “in conjunction with” SPP’s existing load connection study requirements.43  It is followed, \nas needed, by a supplemental load connection study performed by the host transmission owner \nand by SPP’s existing processes for obtaining long-term transmission service.  SPP’s tariff does \nnot subject those later steps to the 90-day deadline,44 but the Commission found this process just \nand reasonable.45  GridLiance West’s approach follows the same structure.  A time-certain \nSystem Impact Study culminates in a report within 90 days, and that report gives the Eligible \nCustomer the information the Show Cause Order requires. \nB. \nCo-Located Load  \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff appears to be unjust and unreasonable because it lacks sufficiently \nclear and consistent tariff provisions addressing the rates, terms, and conditions that apply to co-\nlocation arrangements.46  \nGridLiance West Solution:  As acknowledged by the Commission in its Show Cause \nOrder and further addressed in Part III below, GridLiance West has a limited role in addressing \nco-location of generation with Large Load.  The interconnection of wholesale generation to the \nCAISO Controlled Grid is governed by the CAISO Tariff, including the Resource \nInterconnection Standards in Appendix KK.  GridLiance West’s role is to process and study the \nInterconnection of a Large Load and to coordinate with CAISO so that the generating facility and \n \n41  See Sw. Power Pool, Inc., 194 FERC ¶ 61,031, at P 15 (2026). \n42  Id. \n43  Id. at P 62.   \n44  Id. at P 16. \n45  Id. at P 62. \n46  Show Cause Order at PP 85, 93-102."},{"page":12,"startToken":5094,"endToken":5556,"text":"12 \nthe Large Load are studied, interconnected, and operated together.  As revised, the GridLiance \nWest Tariff and CAISO Tariff jointly allocate those responsibilities. \nRecognizing CAISO’s predominant role in studying generator interconnections, \nGridLiance West proposes the adoption of tariff provisions that tie into CAISO requirements \nincluding: \n New Section 10.18.6 requires GridLiance West to study co-located Large Loads \nin accordance with proposed CAISO Tariff Section 25.7.6 and requires specific \ninformation regarding the net injection or net withdrawal of the combined co-\nlocated arrangement.47   \n Proposed Section 10.5.1(viii) requires the Large Load Interconnection Application \nto include information about the co-located Generating Facility sufficient to \nensure compliance with Sections 25.1.1, 25.7.5, and 25.7.6 of the CAISO Tariff. \n Alignment of GridLiance West procedures to ensure the planned coordination \nenvisioned in the proposed CAISO Tariff Section 25.7.6 by which CAISO will \nconduct Interconnection Studies in coordination with the PTO that account for the \nnet impact of the co-located configuration on the CAISO Controlled Grid, with \nmemorialization of the combined co-located operation in the Generator \nInterconnection Agreement.  GridLiance West respectfully defers to CAISO on its \ndescription of the generator interconnection revisions and processes. \nHowever, GridLiance West notes that proposed new Section 10.18.6 of the GridLiance \nWest Tariff provides that the Interconnection processes applicable to a co-located Large Load are \notherwise the same as those applicable to any other Large Load, and are, therefore, subject to the \nsame readiness requirements, study timelines, ride-through and ramp-rate requirements, \nenergization conditions, and cost recovery obligations as a Large Load.  This treatment avoids \nundue discrimination between the two configurations while accounting for the technical \ncharacteristics unique to co-location.  \nAdditionally, in Section 10.18.6, GridLiance West provides a path for adhering to \nCAISO’s proposed revised CAISO Tariff Section 25.1.1 such that a Generating Unit that will not \ninject Energy onto the CAISO Controlled Grid and will instead serve a co-located End User as \npermitted by the Local Regulatory Authority is not required to submit an Interconnection \nRequest pursuant to CAISO’s Appendix KK.  Section 10.18.6 also requires that, under such \narrangements, the Generating Unit has sufficient control technologies to ensure the co-located \narrangement has no material impact on the CAISO Controlled Grid.48  Proposed new Section \n8.1.5.1(ix) further provides that GridLiance West is not obligated to energize a co-located Large \nLoad until necessary control and system protection technologies have been installed, tested, and \nvalidated; it also requires the Large Load to be metered separately from its co-located generation. \n \n47  GridLiance West Tariff §§ 10.5.1(viii), 10.18.6; CAISO Proposed Tariff § 25.7.6; CAISO Proposed Tariff, App. \nKK § 2.4.4. \n48  CAISO Proposed Tariff § 25.1.1."},{"page":13,"startToken":5556,"endToken":6086,"text":"13 \nC. \nFlexible Large Load Services \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff and PTO Tariffs appear to be unjust and unreasonable because they \nlack a study process for evaluating the ability of Large Loads to flexibly reduce demand and the \ninformation required to study providing flexible service while maintaining reliability.49  The \nCommission also noted that the CAISO Tariff allows an interconnection customer to request a \nlimited operation study for a generating unit before its Interconnection Facilities or Network \nUpgrades are complete, but it offers no comparable interim option for load.50   \nGridLiance West Solution:  GridLiance West defers to CAISO regarding transmission \nservice offerings such as the non-firm or flexible services discussed in the Show Cause Order. \n \nWith respect to interconnection service, GridLiance West proposes two interim services \nthat allow a Large Load to begin taking interconnection service before all of its upgrades are in \nplace that reflects the Large Load’s ability to reduce load: the existing Partial Interim Service and \nFILI Service.  Both services will be available to Eligible Customers serving Large Load. The \nprocess for application and receipt of these forms of interconnection service will include the \nfollowing steps: \n \nGridLiance West proposes to define FILI Service as aligned with CAISO’s proposed \ndefinition.51  Under new Section 10.18.2, FILI Service is available if the Large Load can reduce \nits load at a specified Point of Interconnection according to protocols in a FILI Service \nAgreement among the Large Load, GridLiance West, and CAISO.  The FILI Service Agreement \nspecifies the Network Upgrades or Interconnection Facilities needed to conclude FILI Service \nand provide full Interconnection service.52  To align with CAISO’s revised Tariff, Section 10.18.3 \nrequires the agreement to identify required Interconnection Facilities, protection and control \nsystems, equipment, and operating limitations that apply, and FILI Service may not commence \nuntil all such equipment is installed and commissioned.   \n \nThe Eligible Customer must state in its Interconnection Application whether it intends to \nrequest Partial Interim Service or FILI Service.  Under the new Section 10.18, GridLiance West \nwill then perform an analysis and report the extent to which each requested interim service can \nbe provided consistent with the GridLiance West Tariff and proposed Section 25.7.2 of the \nCAISO Tariff establishing FILI Service.53  The maximum amount of interim service is based on \nthe anticipated availability of capacity and the information the Eligible Customer submits, and \nGridLiance West will update the analysis annually.  In addition, Section 10.12.1 requires the \n \n49  Show Cause Order at PP 59, 104-05. \n50  Id. at P 27. \n51  GridLiance West Tariff § 3.31 (definition of “Flexible Interim Load Interconnection (‘FILI’) Service”); CAISO \nProposed Tariff, App. A; CAISO Proposed Tariff § 25.7.2.  FILI Service is defined as “[c]urtailable, interim \ninterconnection service for a Large Load provided by the CAISO and Participating TO, enabling the Large Load to \ninterconnect prior to the completion of the Large Load’s Network Upgrades or Interconnection Facilities.”   \n52  CAISO will post the FILI Service Agreement on its website.  See CAISO Proposed Tariff § 25.7.2.  \n53  GridLiance West Tariff §§ 10.18, 8.1.5.1(vii)."},{"page":14,"startToken":6086,"endToken":6606,"text":"14 \nLarge Load System Impact Study procedures to evaluate any ability of the Large Load to limit its \nwithdrawals from the CAISO Controlled Grid so that the study process itself recognizes the \noperational characteristics of flexible Large Loads. \nNew Section 10.18.4 requires the FILI Service Agreement to specify the circumstances, \ncontingencies, and operating conditions under which the Large Load may be curtailed; the \ncurtailment mechanism; the entity responsible for performing the curtailment; and the \nnotification method, required response times, permissible duration, restoration timeline, testing \nand verification requirements, and interim operating limits.  Further, new Section 10.18.5 permits \nCAISO or GridLiance West to terminate FILI Service and disconnect the Large Load if it does \nnot adhere to the FILI Service Agreement, consistent with Good Utility Practice.  Further, \nSection 10.17 requires the Large Load Interconnection Agreement to contain provisions \nrequiring the installation and maintenance of any equipment or facilities necessary for the PTO \nto ensure its ability to disconnect or otherwise isolate the Large Load as required by Section \n25.7.1 of the CAISO Tariff.  Section 8.1.5.1(vii) makes an effective FILI Service Agreement a \ncondition of energization where applicable.  These provisions align with CAISO’s proposal in \nSection 25.7.2 of the CAISO Tariff.  \nD. \nCost Shifting and Cost Recovery Agreements \nCommission Concern:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff and PTO Tariffs appear to be unjust and unreasonable because they \nlack adequate mechanisms to mitigate the risk of cost shifting among transmission customers.54  \nThe Show Cause Order directed the PTOs to address: (i) assignment of the Network Upgrade \ncosts and their associated costs, that are needed to provide transmission service to Eligible \nCustomers serving Large Loads; (ii) the need for a pro forma cost recovery agreement to \nmitigate the risk of cost shifting; and (iii) a mechanism to ensure that any payments attributable \nto the Large Load are appropriately credited toward the PTO’s TRR and documented in the \nannual informational filing for formula rates.55  The Commission also indicated a response \nshould clarify how the minimum contribution and financial security required by an Eligible \nCustomer serving a Large Load is calculated, i.e., whether by a per-MW figure or another \nmethodology.56 \nGridLiance West Solution:  Through Section 10.17.2, GridLiance West will utilize a \nCost Recovery Agreement in the form of Attachment A to the GridLiance West Tariff to address \nassignment of costs associated with the construction and operation of any Network Upgrades \nresulting from the Interconnection of the Large Load.  The Cost Recovery Agreement will be \nbetween GridLiance West and the Eligible Customer, and CAISO may join at its election.57  The \nCost Recovery Agreement requires the Eligible Customer to pay 100 percent of the actual costs \nof the Large Load Network Upgrades through the Total Required Revenue Commitment.  The \nTotal Required Revenue Commitment establishes both the obligation to pay actual costs and the \n \n54  Show Cause Order at P 65. \n55  Id. at PP 65-66, 76-84. \n56  Id. at PP 81-82. \n57  GridLiance West Tariff § 10.17.2; Attachment A."},{"page":15,"startToken":6606,"endToken":7107,"text":"15 \nobligation to maintain financial security for the Eligible Customer.  If the Eligible Customer does \nnot provide sufficient service revenue attributable to the Large Load to GridLiance West through \nCAISO’s Access Charges to cover the Eligible Customer’s Annual Required Revenue \nCommitment, the Eligible Customer must provide Cost Recovery Payments58 to fill the gap in \ncost recovery.  Cost Recovery Payments received are credited against GridLiance West’s \nTransmission Revenue Requirement.  This ensures the Eligible Customer pays the full costs of \ntheir Network Upgrades.  GridLiance West will provide a separate workpaper in the \ninformational filing detailing the accounting treatment and crediting for the Annual Required \nRevenue Commitment.  \nThe Cost Recovery Agreement also provides that the required amount of financial \nsecurity shall be decreased as the Eligible Customer pays the Total Required Revenue \nCommitment over time.  GridLiance West may draw upon the required financial security in the \nevent of non-payment, termination, cancellation, or withdrawal to ensure that the Large Load is \nresponsible for costs incurred to provide transmission service, including the cost of network \nupgrades and to prevent cost shifting to other customers.  \nGridLiance West has not proposed to allow an Eligible Customer to satisfy the financial \nsecurity required under the Cost Recovery Agreement with credit support posted under a retail \nagreement.  The Commission’s preliminary finding that an Eligible Customer “may include” \nsuch security permits this approach but does not require it.59  The approach does not fit a Non-\nLSE PTO.  GridLiance West has no retail customers and is not party to any retail service \nagreement.  Any retail security would be held by a third-party load-serving entity, would secure \nthat entity’s retail obligations, and be subject to that entity’s draw rights and priorities, none of \nwhich GridLiance West can control or enforce.  Such security therefore would not be sufficient \nto secure the Eligible Customer’s obligations under the Cost Recovery Agreement.  Accepting it \nwould leave other transmission customers exposed to the cost-shifting risk the Order is intended \nto prevent.  The concern about duplicative credit requirements also does not arise here.  The \nsecurity required under the Cost Recovery Agreement secures a separate, Commission-\njurisdictional payment obligation owed to GridLiance West, not the retail obligation owed to the \nload-serving entity.  Requiring a single form of security held directly by the transmission owner \nis also simpler to administer and applies uniformly.    \nGridLiance West Tariff Section 10.17 requires the Interconnection Agreement itself to \ninclude cost responsibilities, financial security, and payment provisions for all engineering, \nequipment, construction, ownership, operation, and maintenance costs of any Direct Assignment \nFacilities, Reliability Upgrades, Interconnection Facilities, or Network Upgrades.  Section 8.1.2 \nrequires the party requesting Interconnection to pay all such costs, and GridLiance West has \nspecified that this includes Interconnection for Large Loads throughout the GridLiance West \nTariff.   \nLastly, GridLiance West’s Section 13.2.1 requires GridLiance West to conduct reasonable \ncredit review procedures and obtain financial security from the Eligible Customer.  The financial \n \n58  As defined in GridLiance West Tariff, Att. A § 1.3. \n59  Show Cause Order at P 82."},{"page":16,"startToken":7107,"endToken":7599,"text":"16 \nsecurity may take the form of an unconditional and irrevocable letter of credit or an alternative \nform acceptable to GridLiance West and consistent with commercial practices under the Uniform \nCommercial Code, in the amount of the Total Required Revenue Commitment set forth in the \nCost Recovery Agreement.60  GridLiance West’s Tariff conditions Large Load energization on \nposting all required financial security pursuant to Section 8.1.5.1(viii) and asserts that this \nrequirement will be effectuated through the Cost Recovery Agreement.  \nThese provisions ensure that Eligible Customers and Large Loads, not other transmission \ncustomers, bear the costs incurred to serve them. \nE. \nPro Forma Transmission Service Agreements or Other Agreements \nIn the Show Cause Order, the Commission made a preliminary finding that the CAISO \nTariff and PTO Tariffs appear to be unjust and unreasonable because they lack pro forma \ntransmission service agreement language memorializing the above terms.61  GridLiance West \nnotes that the CAISO Tariff controls the provision of transmission service and defers to CAISO \non this point.62  \nSpecific to interconnection, GridLiance West believes the specificity in the revised \nGridLiance West Tariff will provide certainty to potential Eligible Customers serving Large Load \nwith respect to the Commission’s primary concerns, including what ongoing operational and \nreliability requirements will apply, and the control CAISO will have over the Large Load.  Those \nareas and their enforceability appeared to be the primary concerns raised by the Commission in \nthe Show Cause Order.63  While GridLiance West understands including the language in a pro \nforma agreement may simplify compliance, GridLiance West has provided binding tariff \nlanguage to remedy the Commission’s concern.  CAISO will be fully able to enforce this tariff \nlanguage to ensure the ongoing operational requirements are fully realized through \nindividualized interconnection agreements consistent with the GridLiance West Tariff.64  \nGridLiance West is further concerned that developing a pro forma transmission service \nagreement in advance of establishing the procedures through the GridLiance West Tariff, and \nCAISO Tariff as applicable, may be premature and commit GridLiance West to language that \ndoes not meet the needs of either GridLiance West or an Eligible Customer taking transmission \nservice on behalf of Large Loads.  GridLiance West also has yet to process any Large Load \ninterconnection requests which could further inform the needs of a pro forma Interconnection \nAgreement.  However, GridLiance West commits to participating in any future initiative \ninvolving the development of a pro forma Large Load Interconnection Agreement, in \ncoordination with CAISO and other PTOs, and updating its Tariff accordingly. \n \n60  GridLiance West Tariff §§ 8.1.5.1(viii), 13.2.1. \n61  Show Cause Order at PP 56, 63. \n62  See id. at P 39 (“CAISO, however, is responsible for access to and the provision of transmission service, \nincluding transmission and ancillary services, to all Eligible Customers, and the reliability of that transmission \nservice.”). \n63  Id. at P 64. \n64  Id. (raising concerns that requirements may be unenforceable by CAISO without a pro forma agreement)."},{"page":17,"startToken":7599,"endToken":7954,"text":"17 \nF. \nProtection for Existing Commercial Arrangements  \nCommission Concern:  The Show Cause Order directed respondents to provide a \nreasoned explanation for how their proposal will avoid disrupting any existing commercial \narrangements and provide a reasonable implementation period, including time to finalize \nagreements nearing completion, and include a reasonable effective date.65 \nGridLiance West Solution:  GridLiance West requests an effective date of February 16, \n2027, which is coordinated with the effective date CAISO is requesting for its companion tariff \nrevisions and gives Eligible Customers and Large Loads reasonable notice of the new \nrequirements.  The new Section 10.20 of the GridLiance West Tariff provides that the provisions \nspecific to Eligible Customers and Large Loads do not apply to a Load that is operational, or that \nhas a Completed Interconnection Application, before February 16, 2027, unless and until the \nLoad is modified or increased such that it would be a Large Load, or the Load elects to be treated \nas a Large Load.66  This transition provision mirrors proposed Section 25.7 of the CAISO Tariff. \nThis approach is just and reasonable. \nG. \nEnergization and Coordination with CAISO \nGridLiance West also clarifies in Section 8.1.5.1 that energization is conditioned on the \nEligible Customer demonstrating that:  \n \n The Interconnection Agreement and Cost Recovery Agreement are effective;  \n Any Energy the Large Load withdraws from the CAISO Controlled Grid will be \npurchased from an entity authorized to make such sales by the applicable Local \nRegulatory Authority;  \n A Scheduling Coordinator will represent the Large Load in compliance with \nSection 25.7.3 or 25.7.3.1 of the CAISO Tariff;  \n Access Charges will be paid consistent with the CAISO Tariff;  \n The information required by Section 25.7.1 of the CAISO Tariff has been \nprovided; \n Required equipment to facilitate monitoring, disturbance recording, telemetry, \ncommunication, control, protection, and disconnection has been installed, tested, \nand commissioned;  \n Any FILI Service Agreement is effective;  \n All required financial security has been posted;  \n For co-located or behind-the-meter configurations, control and protection \ntechnologies have been validated, and the Large Load is separately metered; and \n \n65  Id. at P 34. \n66  GridLiance West Tariff § 10.20."},{"page":18,"startToken":7954,"endToken":8373,"text":"18 \n The Large Load meets all frequency ride-through requirements, voltage ride \nthrough requirements, post-fault active power recovery requirements, and ramp \nrate limitations in accordance with CAISO Tariff Sections 25.7.1.1, 25.7.1.2, \n25.7.1.3, and 25.7.1.4.  This ensures no Large Load is energized until the \ninformation and equipment necessary to preserve reliability and to operate \nconsistent with CAISO requirements is in place. \nH. \nMinisterial and Conforming Revisions \nGridLiance West has also made several ministerial or conforming revisions to either \nclarify or correct its tariff language or to better clarify the GridLiance West Tariff’s relation to the \nCAISO Tariff.  These include: \n Updating the Cover Sheet, including the Table of Contents; \n Clarifying in Section 1 that GridLiance West does not provide retail electric \nservice; \n Clarifying in Section 1.3 how End-Users access the CAISO Controlled Grid; \n Updating the definition of Ancillary Services in Section 3.3; \n Updating the definition of Available Transfer Capacity in Section 3.5; \n Updating the definition of Congestion Management in Section 3.13;  \n Updating the definition of Dispatch in Section 3.18; \n Updating the definition of End-Use Customer or End-User in Section 3.22; \n Updating the definition of Generating Unit in Section 3.33; \n Updating the definition of Good Utility Practice in Section 3.35; \n Updating the definition of Interest in Section 3.51 to align with CAISO Tariff; \n Updating the definition of Local Publicly Owned Electric Utility in Section 3.54; \n Updating the definition of Metered Subsystem in Section 3.61; \n Updating the definition of Non-Load-Serving Participating TO in Section 3.66 to \nalign with CAISO Tariff; \n Updating the definition of Non-Spinning Reserve in Section 3.68 to align with \nCAISO Tariff; \n Updating the definition of Spinning Reserve in Section 3.87 to align with CAISO \nTariff; \n Updating the definition of Utility Distribution Company in Section 3.99; \n Defining FILI Service in Section 3.31 consistent with the CAISO Tariff; \n Clarifying Gross Load’s definition in Section 3.36 to better match CAISO; \n Revising the definition of “Interconnection” in Section 3.47 to address a \ntypographical error; \n Defining Interconnection Facilities in Section 3.50 to provide clarity; \n Defining Point of Interconnection in Section 3.74 to align with CAISO; \n Revising the definition of Reliability Upgrade in Section 3.82 to refer to a \n“facility” rather than an undefined term; \n Ministerial additions of subsections and headers throughout Sections 8, 9, and 10 \nto enhance readability of the tariff for customers and stakeholders; \n Retitling Section 13 “Creditworthiness and Financial Security”;"},{"page":19,"startToken":8373,"endToken":8789,"text":"19 \n Clarified tariff by consistent use of Eligible Customer throughout; and \n Updating the Designated Representatives in Appendix II to ensure responsiveness. \n \nIII. \nRESPONSES TO REMAINING ELEMENTS OF THE SHOW CAUSE ORDER \nThe Show Cause Order directed PTOs to explain which of the Commission’s directives \ntheir filing resolves and how it resolves them.67  GridLiance West submits that the remaining \nelements of the Show Cause Order are either inapplicable to GridLiance West as a Non-LSE \nPTO or were directed to CAISO in the Show Cause Order.  \nThis includes the requirement to provide data on CAISO’s website regarding Network \nUpgrade costs and planning for serving Large Loads.68  CAISO has proposed that each \nTransmission Plan report the aggregate amounts of proposed and completed Large Load \nadditions by Transmission Zone and the planned Network Upgrades and estimated costs needed \nto accommodate Large Loads, identified by type of equipment.  For its part, GridLiance West \nwill facilitate this by providing relevant data under Section 10.3, which commits GridLiance \nWest to apprise CAISO of Large Load interconnections through its inputs to the Base Case, \nInterconnection Studies, and the Transmission Planning Process.  \nThe Commission primarily directed its questions and findings on co-located load to \nCAISO, given CAISO’s role in generator interconnection.69  GridLiance West therefore defers to \nCAISO on matters governed by the CAISO Tariff.  To the extent the Commission’s directive \nimplicates the PTO Tariffs, GridLiance West has addressed it through Sections 8.1.5.1(ix), \n10.5.1, and 10.18.6 of the GridLiance West Tariff.  GridLiance West has revised its tariff to align \nwith CAISO’s co-location approach. \nSimilarly, the Commission directed its preliminary finding regarding new transmission \nservices for flexible Large Loads, and its directive to submit an informational report regarding \nresource adequacy, solely to CAISO.70 \nLast, GridLiance West notes that CAISO has indicated that it intends to take up the \nmatter of interconnection of electrically proximate Large Load in a future stakeholder \nproceeding.  As such, GridLiance West proposes no tariff revisions in this filing for such \nelements identified in the Show Cause Order.71  This ensures that GridLiance West remains \naligned with CAISO in this evolving process.  GridLiance West commits to participation in any \nsuch future stakeholder process with CAISO. \n \n \n67  Show Cause Order at P 34. \n68  Id. at PP 66, 70-75.  \n69  Id. at PP 93-102 (covering rate design, ancillary services, transmission service, behind-the-meter netting, and \ninterconnection via generator processes). \n70  Id. at PP 104 & n.222, 120-22. \n71  Id. at PP 113-19, 127."},{"page":20,"startToken":8789,"endToken":9252,"text":"20 \nIV. \nRESPONSES TO THE COMMISSION’S REMAINING BRIEFING QUESTIONS \nThe Show Cause Order requested responses to specific briefing questions.72  Consistent \nwith the division of responsibilities between CAISO and the PTOs recognized by the \nCommission in the Show Cause Order, GridLiance West responds to those briefing questions \napplicable to it as a PTO and defers to CAISO on those questions directed to CAISO or that \nconcern matters governed by the CAISO Tariff.  \nIn the Show Cause Order, the Commission recognized that the framework under which \nCAISO provides transmission service is unique among the RTOs/ISOs and that certain \nresponsibilities fall to the PTOs.  The Commission explained that the PTOs “have responsibility \nfor wholesale load interconnection studies,” while CAISO “is responsible for access to and the \nprovision of transmission service, including transmission and ancillary services, to all Eligible \nCustomers, and the reliability of that transmission service.”73  The Commission further \nrecognized that the PTOs may be primarily responsible for conducting the studies that evaluate \nwhether a Large Load may be interconnected to the transmission system and whether Network \nUpgrades are necessary, that this role stems from how CAISO and the PTOs allocated rights and \nresponsibilities in the governing documents establishing CAISO, and that the Commission does \nnot seek to alter that allocation of rights and responsibilities.74  Consistent with that framework, \nthe Commission directed the PTOs to respond to the extent the matters addressed herein \nimplicate aspects of their respective tariffs.75 \nWithin this framework, GridLiance West’s role is to process and study requests to \ninterconnect Eligible Customer Large Loads to its facilities under the GridLiance West Tariff, to \nconstruct any Direct Assignment Facilities and Reliability Upgrades required for those \ninterconnections and recover their costs from the Eligible Customer, and to provide CAISO with \nthe necessary information for its operations and its Transmission Planning Process. Transmission \nservice over the CAISO Controlled Grid, including GridLiance West’s facilities, is provided by \nCAISO under the CAISO Tariff.  CAISO likewise administers the CAISO Markets and the \ngenerator interconnection procedures under the CAISO Tariff, and the California Public Utilities \nCommission has primary responsibility for resource adequacy within the CAISO footprint.76 \nMoreover, as a Non-LSE PTO, GridLiance West serves no retail load and does not forecast or \nplan for load growth within a retail service territory.   \nAccordingly, where a briefing question is directed to CAISO or concerns matters \ngoverned by the CAISO Tariff, GridLiance West indicates the question is not applicable.  Where \na briefing question concerns matters within GridLiance West’s responsibilities as a PTO, \nGridLiance West has addressed it through the proposed revisions to the GridLiance West Tariff, \n \n72  Id. at PP 123-27.  \n73  Id. at P 39. \n74  Id. at P 51. \n75  Id. at P 40; see also id. at P 34. \n76  Id. at P 122."},{"page":21,"startToken":9252,"endToken":9723,"text":"21 \nmost of which are discussed in Part II above.  To assist the Commission’s review, GridLiance \nWest identifies below each briefing question and where it is addressed in this transmittal letter. \n1. \nWhat would be a reasonable implementation period to ensure minimal \ndisruption to such existing commercial arrangements? \nThis question is addressed in Part II.F and Part V of this transmittal letter.  GridLiance \nWest requests an effective date of February 16, 2027, which aligns with the effective date \nCAISO is requesting for its tariff revisions, gives GridLiance West time to implement the revised \nprocedures and update its business practices, and gives Eligible Customers and Large Loads \nreasonable notice of the new requirements.   \n2. \nHow to allow a reasonable amount of time to finalize ongoing agreements \nthat are nearing completion as of the date such tariff provisions are filed with \nthe Commission. \nThis question is addressed in Part II.F of this transmittal letter.  Consistent with CAISO’s \nproposed Section 25.7, the provisions of the GridLiance West Tariff specific to Eligible \nCustomers and Large Loads will not apply to a Load that is operational, or that has a Completed \nInterconnection Application, before the effective date, unless and until the Load is modified or \nincreased such that it would be a Large Load, or the Load elects to be treated as a Large Load.  \nAn interconnection request that is complete before the effective date may therefore proceed \nthrough its studies and Interconnection Agreement under the existing provisions of the \nGridLiance West Tariff, without being required to satisfy the new application, readiness, and \nfinancial security requirements. \n3. \nWhat, if any, potential impacts on regional and local transmission planning \nwould arise from the introduction of the new transmission services discussed \nherein?  \nAs to the effects on regional and local transmission planning, GridLiance West \nparticipates in CAISO’s Transmission Planning Process, and its proposed revisions are designed \nto give CAISO and other planners accurate, timely information about Large Loads.  Under \nSection 10.3, GridLiance West will apprise CAISO of Large Load interconnections through its \ninputs to the Base Case, Interconnection Studies, and the Transmission Planning Process.  \nCAISO, in turn, proposes to include planned and forecasted Large Loads, including transmission \nadditions or upgrades planned under all PTO Tariff interconnection processes, as inputs to its \nUnified Planning Assumptions and Study Plan.  CAISO will also review those planned additions \nmonthly and identify any that indicate high operational risk or uncertainty based on NERC \nReliability Standards.   \n4. \nWhen planning for load growth, how would transmission providers and \nplanners account for flexible Large Loads’ potential preference to take the \nnew transmission services, including potential uncertainties around the type, \nlocation, and quantity of such expected loads? \nThe readiness requirements in Section 10.5.1, including ramp schedules, Site Control, \npermits, and disclosure of affiliated requests, reduce uncertainty about the type, location, and"},{"page":22,"startToken":9723,"endToken":10165,"text":"22 \nquantity of expected Large Loads and help ensure that planners rely on credible projects rather \nthan speculative ones.  For flexible Large Loads that elect interim service, each FILI Service \nAgreement will identify the Network Upgrades or Interconnection Facilities required to conclude \nFILI Service.  CAISO will account for FILI loads in its Base Case, Full Network Model, and \nOperating Procedures.  Thus, following the proposed revisions CAISO can therefore account for \nboth the curtailable interim operation of these loads and the facilities required to transition them \nto full service.  The proposed revisions from CAISO, GridLiance West, and other PTOs should \nenhance the flow of information regarding Large Loads into CAISO’s transmission planning \nprocess. \n5. \nInformation regarding potential structures for agreements between the \ntransmission owner/provider and an Eligible Customer to prevent unjust and \nunreasonable cost shifts among transmission customers related to Network \nUpgrade costs required for Large Loads. \nThis question is addressed in Part II.D of this transmittal letter. \n6. \nInformation on what an appropriate minimum level of cost recovery and \nfinancial security from an Eligible Customer would be under any such \nagreements. \nThis question is addressed in Part II.D of this transmittal letter. \n7. \nWhether the Tariff remains just and reasonable without provisions that \nrequire the evaluation of alternative transmission technologies in studies for \nthe provision of transmission service, using models that are capable of \nevaluating the transmission system to accurately account for advanced \ntransmission technologies, in all instances, without the need for a request \nfrom the Eligible Customer seeking transmission service on behalf of Large \nLoad. \nThis question is addressed in Part II.A.4 of this transmittal letter.  GridLiance West \nproposed provisions that require the evaluation of alternative transmission technologies. \n8. \nIf traditional Network Upgrades are selected instead of alternative \ntransmission technologies, inclusion in the study report to the Eligible \nCustomer seeking transmission service on behalf of Large Load of a \nsufficiently clear demonstration of why alternative transmission technologies \nare not feasible (i.e., would not resolve reliability violations identified or meet \nthe relevant planning criteria) or would not result in lower costs or a faster \ntimeline for accommodating the transmission service request. \nThis question is likewise addressed in Part II.A.4 of this transmittal letter.  Section \n10.12.1 of the GridLiance West Tariff provides that, if traditional Network Upgrades are selected \ninstead of alternative transmission technologies, GridLiance West will provide a demonstration \nof why alternative transmission technologies are not feasible or would not result in lower costs or \na faster timeline for accommodating the Large Load Interconnection request, and a copy of the \ncompleted System Impact Study will be made available to the Eligible Customer."},{"page":23,"startToken":10165,"endToken":10479,"text":"23 \n9. \nWhether specific characteristics of providing transmission service to Eligible \nCustomers on behalf of Large Loads warrant requirements beyond those \ncontemplated here, we seek further briefing. \nGridLiance West does not propose requirements beyond those described in Part II of this \ntransmittal letter at this time.   \n10. \nTo what extent would CAISO allow an interconnection customer’s \ngenerating facility serving electrically proximate Large Load or large co-\nlocated load to participate in CAISO’s energy and ancillary services market, \nand if CAISO were to allow them to participate, what restrictions or \nmitigation would CAISO apply? \nNot applicable.  \n11. \nTo the extent that CAISO plans for the electrically proximate Large Load or \nlarge co-located load associated with an interconnection customer’s \ngenerating facility for resource adequacy purposes, would CAISO account \nfor the generating facilities serving electrically proximate Large Load or \nlarge co-located load in the resource adequacy construct?  \nNot applicable.  \na. Would CAISO allow the generating facilities serving electrically \nproximate Large Load or large co-located load to participate in \nCAISO’s capacity market?   \nNot applicable.  \nb. Would CAISO accredit these generating facilities using the same \nmethod as other CAISO generating facilities?   \nNot applicable.  \nV. \nPROPOSED EFFECTIVE DATE AND WAIVER \n \nGridLiance West respectfully requests that the Commission accept the proposed revisions \nas of February 16, 2027, which aligns with the effective date proposed by the CAISO in its \nsection 205 filing.77  The requested effective date is consistent with the Commission’s directive \nthat tariff revisions include a reasonable implementation period and a reasonable effective date to \nensure minimal disruption to existing or ongoing commercial arrangements.78  Although \nGridLiance West is not aware of any existing commercial arrangements that would be affected \nby the tariff revisions proposed herein, the requested effective date will provide GridLiance West \nadequate time to implement the tariff changes, update applicable procedures and business \n \n77  CAISO Proposed Tariff § 25.7. \n78  Show Cause Order at P 5."},{"page":24,"startToken":10479,"endToken":10700,"text":"24 \npractices, and ensure that requests for service from Eligible Customers taking transmission \nservice on behalf of Large Loads are processed in a manner consistent with the revised tariff \nframework.  Establishing an effective date that aligns with CAISO’s implementation schedule \nwill promote consistent application of the revised tariff provisions throughout the CAISO \nControlled Grid and avoid unnecessary operational and procedural uncertainty.  For these \nreasons, GridLiance West respectfully requests that the Commission find that the proposed \neffective date is just and reasonable and complies with the Commission’s directive regarding \nimplementation timing. \n \nTo the extent necessary, GridLiance West respectfully requests waiver of any applicable \nrequirement of Part 35 not addressed herein. \n \nVI. \nCONTENTS OF THE FILING \nIn addition to this transmittal letter, this filing contains the following components: \n \nAppendix A:  Clean Version of the Revised Sections of the GridLiance West Tariff;  \n \nAppendix B:  Redlined Version of the Revised Sections of the GridLiance West Tariff; \nand \n \nAppendix C: Pro Forma Cost Recovery Agreement. \n \nVII. \nCORRESPONDENCE AND SERVICE \n \nThe following persons are authorized to receive notices and service with respect to this \nfiling:   \n \nElizabeth Ramey \nSenior Attorney \nNextEra Energy, Inc. \n801 Pennsylvania Avenue, NW \nSuite 220 \nWashington, DC 20004 \n(202) 909-5696 \nelizabeth.ramey@nexteraenergy.com\nMeghan O’Brien  \nVan Ness Feldman, LLP \n2000 Pennsylvania Avenue, NW \nSuite 6000 \nWashington, DC 20006 \n(202) 298-1800 \nmobrien@vnf.com"},{"page":25,"startToken":10700,"endToken":10831,"text":"25 \nVIII. CONCLUSION \n \nFor the reasons set forth above, GridLiance West respectfully requests that the \nCommission accept the proposed revisions to the GridLiance West Tariff, effective February 16, \n2027.  GridLiance West furthermore requests that the Commission determine with respect to the \nremaining elements of the Show Cause Order that GridLiance West has complied with the Show \nCause Order components applicable to it as a Non-LSE PTO.  Accordingly, GridLiance West \nrespectfully requests that the show cause proceeding be terminated with respect to GridLiance \nWest. \n \n \n \n \n \n \n \nRespectfully submitted, \n \n \n \n \n \n \n \n/s/ Meghan O’Brien  \n \n \n \n \n \n \n \n \nMeghan O’Brien  \nNolan Brickwood \nJoseph B. Nelson  \nJedrick M. Kim  \nVan Ness Feldman, LLP \n2000 Pennsylvania Avenue, NW \nSuite 6000 \nWashington, DC 20006 \n(202) 298-1800 \nmobrien@vnf.com  \nnbrickwood@vnf.com    \njbn@vnf.com   \njkim@vnf.com \n \n \n \n \n \n \n \nCounsel for GridLiance West LLC \n \nEnclosure"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":725,"startToken":0,"endToken":452},{"p":2,"at":725,"title":"I. BACKGROUND","method":"printed heading","endPage":2,"endAt":742,"startToken":452,"endToken":454},{"p":2,"at":742,"title":"A. GridLiance West","method":"printed heading","endPage":2,"endAt":1856,"startToken":454,"endToken":610},{"p":2,"at":1856,"title":"B. Show Cause Order","method":"printed heading","endPage":3,"endAt":1556,"startToken":610,"endToken":962},{"p":3,"at":1556,"title":"C. Motion for Abeyance","method":"printed heading","endPage":4,"endAt":208,"startToken":962,"endToken":1211},{"p":4,"at":208,"title":"II. GRIDLIANCE WEST’S PROPOSED TRANSMISSION OWNER TARIFF","method":"printed heading","endPage":5,"endAt":1427,"startToken":1211,"endToken":1831},{"p":5,"at":1427,"title":"A. Large Load Interconnection Process","method":"printed heading","endPage":11,"endAt":1862,"startToken":1831,"endToken":4924},{"p":11,"at":1862,"title":"B. Co-Located Load","method":"printed heading","endPage":13,"endAt":4,"startToken":4924,"endToken":5557},{"p":13,"at":4,"title":"C. Flexible Large Load Services","method":"printed heading","endPage":14,"endAt":1403,"startToken":5557,"endToken":6297},{"p":14,"at":1403,"title":"D. Cost Shifting and Cost Recovery Agreements","method":"printed heading","endPage":16,"endAt":688,"startToken":6297,"endToken":7210},{"p":16,"at":688,"title":"E. Pro Forma Transmission Service Agreements or Other Agreements","method":"printed heading","endPage":17,"endAt":4,"startToken":7210,"endToken":7600},{"p":17,"at":4,"title":"F. Protection for Existing Commercial Arrangements","method":"printed heading","endPage":17,"endAt":1186,"startToken":7600,"endToken":7779},{"p":17,"at":1186,"title":"G. Energization and Coordination with CAISO","method":"printed heading","endPage":18,"endAt":441,"startToken":7779,"endToken":8025},{"p":18,"at":441,"title":"H. Ministerial and Conforming Revisions","method":"printed heading","endPage":19,"endAt":165,"startToken":8025,"endToken":8394},{"p":19,"at":165,"title":"III. RESPONSES TO REMAINING ELEMENTS OF THE SHOW CAUSE ORDER","method":"printed heading","endPage":20,"endAt":4,"startToken":8394,"endToken":8790},{"p":20,"at":4,"title":"IV. RESPONSES TO THE COMMISSION’S REMAINING BRIEFING QUESTIONS","method":"printed heading","endPage":23,"endAt":1362,"startToken":8790,"endToken":10353},{"p":23,"at":1362,"title":"V. PROPOSED EFFECTIVE DATE AND WAIVER","method":"printed heading","endPage":24,"endAt":814,"startToken":10353,"endToken":10588},{"p":24,"at":814,"title":"VI. CONTENTS OF THE FILING","method":"printed heading","endPage":24,"endAt":1162,"startToken":10588,"endToken":10639},{"p":24,"at":1162,"title":"VII. CORRESPONDENCE AND SERVICE","method":"printed heading","endPage":25,"endAt":4,"startToken":10639,"endToken":10701},{"p":25,"at":4,"title":"VIII. CONCLUSION","method":"printed heading","endPage":25,"endAt":970,"startToken":10701,"endToken":10831}]}