{"document":{"slug":"rec-20261116-5346","title":"Revisions to TO Tariff to Provide for Large Load Interconnection","issued":"2026-11-16","accession":"20261116-5346","docket":"ER27-534-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"DesertLink, LLC","kind":"tariff filing","file":"sources/filings/text/20261116-5346_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5346","tier":"record","sha256":"a9ba306729926eaf370b4a3b56b1caea333262f262c4b17b5a602191637801ec","pages":529,"tokens":187664,"emptyPages":[],"textThemes":["study","cost","credit","flex"]},"pages":[{"page":1,"startToken":0,"endToken":413,"text":"Josh R. Robichaud \nAssociate \nT:+1.202.828.1731             F: +1.800.404.3970 \n2001 M Street NW, Suite 900, Washington,DC 20036-3310 \njosh.robichaud@bracewell.com            bracewell.com \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nNovember 16, 2026 \nVIA ETARIFF \nThe Honorable Debbie-Anne A. Reese \nSecretary \nFederal Energy Regulatory Commission \n888 First Street, N.E. \n \nWashington, D.C. 20426 \nRe:  \nDesertLink, LLC, Docket No. ER27-___-000 \nCalifornia Independent System Operator Corporation, Docket No. EL26-71-___ \nProposed Revisions to the DesertLink, LLC Transmission Owner Tariff to Provide \nfor Large Load Interconnection and Cost Recovery \nDear Secretary Reese: \nPursuant to section 205 of the Federal Power Act (“FPA”)1 and Part 35 of the Federal Energy \nRegulatory Commission’s (“FERC” or “Commission”) regulations,2 and in response to the \nCommission’s order instituting the show cause proceeding in California Independent System \nOperator Corp.,3 DesertLink, LLC (“DesertLink”) submits revisions to its Transmission Owner Tariff \n(“TO Tariff”) to establish a framework for the interconnection of Large Loads4 and for the \nrecovery of the costs of transmission upgrades driven by Large Loads. The revisions include (1) \nadding a new Section 10A and a new Appendix VI (Large Load Interconnection Procedures \n(“LLIP”)) to establish an interconnection process for Eligible Customers for Large Load (“ECLLs”); \n(2) corresponding revisions to the TO Tariff; and (3) adding a new Appendix V, the pro forma \nLarge Load Cost Recovery Agreement (“CRA”). DesertLink respectfully requests that the \nCommission accept the proposed tariff revisions to become effective January 16, 2027, sixty-one \n(61) days after filing, consistent with the Commission’s prior notice requirement,5 and grant any \nnecessary waivers. \n \n1  16 U.S.C. § 824d (2022). \n2  18 C.F.R. pt. 35 (2026). \n3  Cal. Indep. Sys. Operator Corp., 195 FERC ¶ 61,214 (2026) (“Show Cause Order”). \n4  Capitalized terms used but not otherwise deﬁned in this transmittal letter have the meanings assigned to them in \nthe TO Tariﬀ, including the proposed revisions to Section 3 and the pro forma CRA in Appendix V, or, if not deﬁned \ntherein, in the CAISO Tariﬀ. \n5  18 C.F.R. § 35.3(a)(1)."},{"page":2,"startToken":413,"endToken":918,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 2 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nI. \nINTRODUCTION AND SUMMARY OF FILING \nThe proposed revisions establish a transparent framework for DesertLink, a transmission-only, \nnon-load-serving Participating Transmission Owner (“PTO”) in the California Independent System \nOperator Corporation (“CAISO”), to interconnect Large Loads and to recover the costs of \ntransmission upgrades that are driven, in whole or in part, by a Large Load (“Large Load-Driven \nUpgrades”). New Section 10A and the LLIP in Appendix VI govern ECLL applications, studies, \ninterim service, and interconnection agreements. The pro forma CRA in Appendix V establishes \nthe Eligible Customer’s twenty-year Minimum Transmission Revenue Contribution (“MTRC”) and \nrelated payment and security obligations for each Covered Upgrade. Amounts received under a \nCRA are credited to transmission customers through DesertLink’s existing Transmission Revenue \nBalancing Account Adjustment (“TRBAA”), and the Formula Rate Template is revised to identify \nCovered Upgrade plant and to ensure that those credits are not counted twice. \nThe filing responds to the Show Cause Order’s direction that respondents (1) ensure transparency \nconcerning the network upgrade costs to provide transmission service to Eligible Customers on \nbehalf of large loads, (2) establish a pro forma cost recovery agreement to mitigate the risk of \ncost shifting among transmission customers, and (3) ensure that such payments are appropriately \ncredited toward transmission owners’ transmission revenue requirements.6 The CRA assigns the \nwholesale revenue-support obligation to the Eligible Customer that takes transmission service \non behalf of the Large Load Facility and backs that obligation with Construction Security, \nOperational Security, and a Termination Fee. The framework is designed to mitigate the risk that \nother customers bear the costs of a Covered Upgrade if the associated Large Load is delayed, \nreduced, or does not materialize, while preserving DesertLink’s recovery of its revenue \nrequirement through its Formula Rate and the CAISO Transmission Access Charge (“TAC”), and \nwithout changing CAISO cost allocation. \nThe proposed revisions do not change the cost-of-service inputs, return, depreciation, taxes, or \nallocators used to calculate DesertLink’s revenue requirement. Absent any Covered Upgrade or \nCRA, the revised Formula Rate Template produces the same revenue requirement as the \ncurrently effective Formula Rate Template, and no changes are proposed to DesertLink’s Formula \nRate Implementation Protocols (Appendix IV) or to Appendix I of the TO Tariff. Once these \nrevisions are accepted, a conforming, executed CRA with populated Schedules generally will not \nrequire an individual FPA section 205 filing, while unexecuted agreements, agreements \ncontaining a material deviation, and other agreements required by Commission rule or order will \nbe filed with the Commission.7 \n \n6  Show Cause Order at P 3. \n7  See Ex. No. DLK-200 (Arzola Testimony); CRA § 5.1."},{"page":3,"startToken":918,"endToken":1436,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 3 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nII. \nBACKGROUND \nA. DesertLink and Its Formula Rate \nDesertLink is a transmission-only PTO in the CAISO that owns the Harry Allen to Eldorado 500 kV \nTransmission Line Project (“Harry Allen to Eldorado Project”), which CAISO selected DesertLink \nto develop in 2016 through its Order No. 1000-compliant competitive solicitation process and \nwhich DesertLink placed in service in August 2020. DesertLink is a non-load-serving PTO; it neither \nserves retail load nor has a retail relationship with any customer seeking a Large Load \ninterconnection. DesertLink’s formula rate consists of its Formula Rate Template (Appendix III of \nthe TO Tariff) and its Formula Rate Implementation Protocols (“Protocols”) (Appendix IV of the \nTO Tariff) (together, the “Formula Rate”), which were originally accepted in Docket No. ER17-\n135-000 and most recently revised in Docket No. ER26-3479-000. DesertLink’s Transmission \nRevenue Requirement (“TRR”) is the sum of its Base Transmission Revenue Requirement (“Base \nTRR”), determined under the Formula Rate, and its TRBAA, and is recovered through the CAISO \nTAC. DesertLink already uses the TRBAA to credit customers with revenue it receives outside the \nTAC. \nB. Show Cause Order and Stakeholder Process \nOn June 18, 2026, the Commission issued the Show Cause Order, instituting an FPA section 206 \nproceeding in Docket No. EL26-71-000 directed to CAISO and its PTOs. The Commission \npreliminarily found that existing tariffs appear to be unjust, unreasonable, or unduly \ndiscriminatory or preferential because they lack sufficiently clear and consistent provisions to \naddress the challenges posed by the rapid growth of large loads and co-location arrangements \nbetween loads and generating facilities.8 The Commission directed each respondent either to \nshow cause why its tariff remains just and reasonable or to explain what tariff changes would \nremedy the identified concerns.9 \nFollowing the Show Cause Order, CAISO convened joint coordination meetings with the PTOs to \naddress the Show Cause Order and CAISO’s proposed implementation framework, and \nDesertLink participated in those meetings from July through October 2026. DesertLink also \nparticipated in CAISO’s public stakeholder meetings and submitted written comments on CAISO’s \nStraw Proposal, Draft Final Proposal, and Draft Tariff Language asking CAISO to recognize non-\nload-serving and affected PTOs expressly and to preserve a meaningful role for those PTOs in the \ninterconnection and study process. DesertLink further participated in discussions with other non-\nload-serving PTOs, the broader PTO group, and load-serving PTOs addressing the application and \nstudy process, information sharing, technical coordination, and the allocation and recovery of \ncosts.10 Those discussions highlighted the need to ensure that an affected PTO has a meaningful \n \n8  Show Cause Order at P 38. \n9  Id. at Ordering Para. B. \n10  See Ex. No. DLK-100 (Hayes Testimony), Section IV."},{"page":4,"startToken":1436,"endToken":1974,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 4 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nrole in the process even when it does not provide retail service to the requesting load. \nDesertLink’s proposal does not displace the separate arrangements that an Eligible Customer \nmust enter into with an Affected System Owner for an Affected System Upgrade or with the \nowner of a regional project share owned by another entity.11 \nIII. \nDESCRIPTION OF THE PROPOSED REVISIONS \nA. Large Load Interconnection Framework (Section 10A and Appendix VI) \nA new Section 10A of the TO Tariﬀ establishes an interconnection process for ECLL \nInterconnections. An ECLL is a Utility Distribution Company or Metered Subsystem that provides \nretail transmission and interconnection service to Large Load End-Users in the CAISO Balancing \nAuthority Area, and a Large Load is an End-User located at a single site behind one or more Points \nof Withdrawal from the CAISO Controlled Grid with a peak load of 50 MW or greater. Section \n10A.2 speciﬁes the contents of an ECLL Interconnection Application, including the load ramp \nschedule, site plan, Site Control, permits and approvals, electrical conﬁguration, related requests, \ntechnical data, and Co-Located Large Load information. Section 10A.3 directs that ECLL \nInterconnection Applications be processed, and ECLL Interconnection Agreements be tendered, \nexecuted, and ﬁled, under the LLIP in Appendix VI. Section 10A.4 provides for Interim Firm \nInterconnection Service and Flexible Interim Load Interconnection (“FILI”) Service before the \nrequired facilities are completed. FILI Service is subject to curtailment, including during normal \noperating conditions, and is curtailed before Firm Interconnection Service. If FILI Service is \nelected, the Large Load Interconnection Customer must ensure that, before the Service \nCommencement Date, the Large Load Customer executes, or requests the ﬁling of an unexecuted, \nFILI Service Agreement with DesertLink and, as applicable, CAISO. That agreement identiﬁes the \ncurtailment conditions and the mechanism for implementing curtailment. Section 10A.5 \naddresses Co-Located Large Loads.12 \nThe LLIP applies to new Large Loads, capacity increases to Large Loads previously processed \nunder the LLIP, and increases of 50 MW or greater to existing loads not previously processed \nunder the LLIP, for completed Interconnection Requests submitted after Appendix VI becomes \neffective. It provides for a scoping meeting, a Large Load Study Process Agreement, and a Large \nLoad Interconnection Study subject to CAISO review and concurrence, with a ninety-Calendar-\nDay reasonable-efforts study period. The study must consider alternative transmission \ntechnologies, including dynamic line ratings, advanced power flow control devices, advanced \nconductors, and transmission switching, and, if traditional network upgrades are selected, the \nPTO must demonstrate why alternative transmission technologies are not feasible or would not \nresult in lower costs or a faster timeline.13 The LLIP also establishes financial readiness \n \n11  See CRA §§ 4.2 and 6.3.6. \n12  TO Tariﬀ §§ 3.24 and 3.62. \n13  LLIP § 4.6.1.1."},{"page":5,"startToken":1974,"endToken":2569,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 5 \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nrequirements, including a $250,000 Interconnection Study Deposit, Commercial Readiness \nDeposits that bring the aggregate deposit to twenty percent (20%) of the estimated construction \ncost of the Large Load Network Upgrades attributable to the request, and withdrawal penalties, \nand coordinates those deposits with the CRA so that the same costs are not secured twice.14 \nThe existing Section 10 is retitled the Transmission System Wholesale Load (“TSWL”) \nInterconnection Process and continues to govern TSWL Interconnections. Section 10.1 directs \nECLL requests to Section 10A, and revised Section 10.9 provides that, where a TSWL \nInterconnection will serve one or more Large Loads, the Eligible Customer taking or requesting \ntransmission service on behalf of the Large Load must execute and maintain a CRA, or request \nthat it be ﬁled unexecuted, as a condition to DesertLink’s design, procurement, construction, or \noperation of any associated Large Load-Driven Upgrades. Section 3 adds deﬁnitions for, among \nother terms, Co-Located Large Load, Cost Recovery Agreement, ECLL, ECLL Interconnection, Firm \nInterconnection Service, FILI Service, Interim Firm Interconnection Service, Large Load, Point of \nWithdrawal, Site Control, and TSWL Interconnection, and renumbers the existing deﬁnitions. \nB. Pro Forma CRA (Appendix V)\nThe pro forma CRA is a contract between DesertLink, as Transmission Owner, and the Eligible \nCustomer taking wholesale transmission service under the CAISO Tariﬀ on behalf of a Large Load \nCustomer. Assigning the payment obligation to that Eligible Customer preserves the wholesale \nobligor structure and does not establish a FERC-jurisdictional retail rate or payment obligation for \nthe Large Load Customer. The Large Load Customer executes a Limited Acknowledgment for \ninformation, authorization, notice, and cooperation purposes, but is not a party to the wholesale \npayment obligations. CAISO is not a party to the CRA, and the CRA creates no obligation of CAISO. \nCovered Upgrades include Large Load-Driven Upgrades and any DesertLink-owned share of a \nCAISO-Assigned Regional Project identiﬁed in the applicable Schedules for which an Annual MTRC \nis established; Aﬀected System Upgrades and regional project shares owned by another entity \nare addressed through separate arrangements. Where DesertLink requires a CRA, Section 10.9 \n(for a TSWL Interconnection) and LLIP Section 5.3, incorporated through Section 10A.6 (for an \nECLL Interconnection), require the applicable Eligible Customer to execute it, or to request that it \nbe ﬁled unexecuted, within the applicable interconnection-agreement execution period.15 \nFor each Covered Upgrade, the CRA establishes an Annual MTRC calculated solely under the \nMTRC Calculation Template in Schedule 5, separately from the Formula Rate. The Estimated \nAnnual MTRC uses then-current estimated capital cost. Within one year after the Covered \nUpgrade enters service, when actual capital cost is known, DesertLink establishes the Final \nAnnual MTRC as the final incurred capital cost multiplied by the Project-Specific Levelized Fixed \nCharge Rate calculated under Schedule 5 using the applicable capital structure, cost of debt, \nreturn on equity, income-tax inputs, a fixed five percent (5%) annual levelized-depreciation \n14  See LLIP §§ 3.10, 3.10.1, 4.2.1, and 4.6.1.4. \n15  See CRA Recitals, § 2.17, Article 5, and Limited Acknowledgment; TO Tariﬀ §§ 10.9 and 10A.6; LLIP § 5.3."},{"page":6,"startToken":2569,"endToken":3138,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 6 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nschedule, and the fixed expense allocator. The MTRC Term begins on the applicable in-service \ndate and ends on the day immediately preceding its twentieth anniversary, with partial Rate \nYears prorated. The Final Annual MTRC is not recalculated through the Formula Rate and may \nchange only as permitted by Section 6.3.1, including to correct errors or fraud, to implement an \neffective prospective reassignment or a final Commission order, or to reflect prospectively a \nCommission-approved change in DesertLink’s return on equity or subsequently enacted tax rates \nor tax law.16 \nThe twenty-year MTRC Term is a deﬁned contractual revenue-support period, not the depreciable \nlife of a Covered Upgrade. Each Covered Upgrade placed under CAISO’s Operational Control \nremains in DesertLink’s rate base and Base TRR and is subject to ordinary Formula Rate treatment. \nWhere an upgrade is driven by more than one Large Load, Schedule 1 identiﬁes an Initial \nAllocation Percentage for each Large Load Customer using the applicable ﬁnal study and \nallocation methodology, accounting for loads studied individually, jointly, or in a cluster and for \nany portion of the facility that serves other transmission system needs or customers. The \naggregate Annual MTRC allocated to all Large Load Customers may not exceed one hundred \npercent (100%) of the Annual MTRC for that Covered Upgrade; any unallocated portion remains \nsubject to otherwise applicable CAISO cost-allocation and rate-recovery requirements. Each \nallocation percentage is applied only once in calculating the Annual MTRC.17 \nThe Eligible Customer pays a Supplemental MTRC equal to the greater of zero and the applicable \nAnnual MTRC less Qualifying Transmission Revenues (“QTR”). QTR consists of wholesale \ntransmission revenues attributable to service to the Large Load Facility that reduce transmission \nrevenues otherwise collected from CAISO customers or directly credit DesertLink’s Net Revenue \nRequirement. As applicable, QTR includes the portion of TAC revenues attributable to the Large \nLoad Facility and allocable to DesertLink under the reproducible methodology in Schedule 2, \nqualifying Wheeling Access Charges, and other wholesale transmission-access, wheeling, or \ntransmission-service charges, including charges paid through a non-PTO serving entity, without \nduplicate recognition. The Annual MTRC therefore operates as a revenue ﬂoor, not an additive \ncharge or separate capacity-reservation commitment. DesertLink invoices the forecast \nSupplemental MTRC, including any prior-period true-up adjustment, in monthly installments \nfollowing each Annual Projection, and serves a Reconciliation Statement with each Annual \nUpdate using actual QTR. Under-billed or over-billed amounts are carried into billing following \nthe next Annual Projection, without interest between DesertLink and the Eligible Customer.18 \nSection 6.7 of the CRA establishes for each Covered Upgrade a Total Required Revenue \nCommitment equal to the Final Annual MTRC multiplied by twenty, which is reduced by QTR, \nSupplemental MTRC Receipts, Applied Security Proceeds, and other permitted amounts, without \n \n16  See CRA §§ 2.5, 2.26, 2.38, and 6.3.1 and Schedule 5. \n17  See id. § 6.3.2 and Schedule 1. \n18  See id. §§ 6.2 and 6.4–6.6 and Schedule 2."},{"page":7,"startToken":3138,"endToken":3671,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 7 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \ndouble counting, and tracked in an upgrade-specific Cumulative Revenue Ledger. Cancellation, \ndownsizing, curtailment, or cessation after an applicable in-service date does not itself eliminate \nthe Eligible Customer’s obligations. Upon effective termination of the CRA or permanent \ncessation of service after that date, the Eligible Customer owes a lump-sum Termination Fee \nequal to the Remaining Cumulative Revenue Responsibility, less any Supplemental MTRC billed \nand unpaid as of the effective termination or cessation date, which remains separately payable \nand secured. The Termination Fee is an accelerated contractual termination charge, not a \npenalty. DesertLink holds each Termination Fee in a separately identified, interest-bearing \nTermination Fee Account and credits it to transmission customers through the TRBAA as Annual \nTermination Fee Credits equal to the Annual MTRC for each remaining Rate Year of the MTRC \nTerm. The uncredited balance is accounted for as a deferred liability and is not included in rate \nbase.19 \nArticle 7 of the CRA requires Construction Security for incurred and irrevocably committed costs \nand Pre-In-Service Termination Costs, including applicable cancellation, demobilization, and \nrestoration costs and properly accrued allowance for funds used during construction. Operational \nSecurity must be delivered no later than thirty Calendar Days before the earliest expected in-\nservice date and equals one hundred percent (100%) of the nominal Remaining Cumulative \nRevenue Responsibility. Consistent with the Commission’s decision to reduce unnecessary \nredundancy by allowing an Eligible Customer to rely on credit support posted by a large load \nunder a retail agreement, direct Operational Security is reduced dollar-for-dollar by Qualifying \nRetail Security Support identiﬁed in a currently eﬀective Retail Security Certiﬁcation. That \nreduction does not reduce the underlying wholesale obligation and does not apply to \nConstruction Security or Pre-In-Service Termination Costs. Security does not cap the Eligible \nCustomer’s liability. Construction Security provided under an interconnection or engineering and \nprocurement agreement for the same costs counts toward, and is not duplicated by, the CRA \nrequirement. A Commercial Readiness Deposit may be credited dollar-for-dollar toward required \nCRA Construction Security only if it is in a form permitted under Schedule 3 and DesertLink elects \nthat treatment in writing; no amount may be applied or credited more than once.20 \nThis ﬁling adopts the conservative requirement that direct Operational Security equal one \nhundred percent (100%) of the nominal Remaining Cumulative Revenue Responsibility, subject \nonly to Qualifying Retail Security Support. DesertLink expects to work with CAISO and interested \nstakeholders to evaluate whether, and under what objectively deﬁned circumstances, a lower \nrequirement or another credit-support structure could provide comparable protection against \ncost shifting. Any future change would be submitted to the Commission for review under FPA \nsection 205. \n \n19  See id. §§ 3.3.4, 3.5, and 6.7. \n20  Show Cause Order, Comm’r See Concurrence at P 9."},{"page":8,"startToken":3671,"endToken":4286,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 8 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nC. Crediting CRA Amounts Through the TRBAA (Sections 3 and 5.5) \nCRA amounts are credited to transmission customers through DesertLink’s existing TRBAA, not as \nFormula Rate revenue credits. Because the TO Tariﬀ deﬁnes Transmission Revenue Credits as \namounts received from, or charges imposed by, CAISO, DesertLink proposes to revise the \ndeﬁnition of the TRBAA (Section 3.103) and Section 5.5 so that the TRBAA also ﬂows through to \ntransmission customers all amounts that a CRA requires to be credited through it. The revisions \nclarify that Section 5.5 does not require the payment of interest between DesertLink and a party \nto a CRA, which is governed solely by the CRA, and the deﬁnition of Interest (Section 3.60) is \nrevised to the same eﬀect. The deﬁnition of Transmission Revenue Credits is unchanged.21 \nEach October, DesertLink will include a Forecast TRBAA Credit equal to the projected \nSupplemental MTRC for the following year, increased or reduced by any prior-period true-up \nadjustment, plus any Annual Termination Fee Credit scheduled for that year. The Forecast TRBAA \nCredit lowers the TRR eﬀective January 1 and, through the TAC, the transmission charges paid by \nall customers, while the Eligible Customer pays the Supplemental MTRC directly to DesertLink. \nSupplemental MTRC cash receipts, Applied Security Proceeds applied to Supplemental MTRC \nobligations, Annual Termination Fee Credits, and any duplicate-recovery credits are recorded in \nthe TRBA. A billed but unpaid Supplemental MTRC is not a TRBAA Credit. If DesertLink later \nreceives payment or applies Security proceeds to that obligation, the amount is recorded only in \nthe Rate Year in which it is received or applied. Any diﬀerence between the Forecast TRBAA Credit \nand the actual amounts recorded in the TRBA is reﬂected in the TRBA principal balance and \nﬂowed through in a subsequent TRBAA. QTR is not credited again, and posting, drawing, or \nholding Security does not itself produce a credit. The Eligible Customer remains liable for unpaid \nLarge Load Charges, and the CRA’s Security and collection provisions mitigate, but do not \neliminate, nonpayment risk. Because the TRBA ensures that DesertLink collects no more and no \nless than its Base TRR, DesertLink retains none of the TRBAA Credits.22 \nDesertLink’s annual TRBAA ﬁling is made under FPA section 205 and is noticed by the Commission, \nopen to intervention, comment, and protest, and subject to Commission review and acceptance. \nDesertLink will include in each ﬁling the calculations, workpapers, and testimony supporting the \nTRBAA Credits, substantially in the form of Exhibit No. DLK-205, with customer-speciﬁc \ninformation presented on an aggregated basis or submitted with a request for privileged \ntreatment under 18 C.F.R. § 388.112. No change to Appendix I is required because TRBAA Credits \nare included in the TRBAA amount stated in Appendix I each year.23 \nBalances in the TRBA attributable to CRA amounts accrue interest in the same manner as other \nTRBA balances, because a balance created by a late payment, a non-payment before Security is \napplied, or the timing of monthly installments reﬂects an actual over- or under-recovery by \n \n21  TO Tariﬀ §§ 3.60, 3.103, and 5.5; see also Ex. No. DLK-200 (Arzola Testimony). \n22  See CRA § 6.8. \n23  See id.; Ex. No. DLK-200 (Arzola Testimony)."},{"page":9,"startToken":4286,"endToken":4830,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 9 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nDesertLink. By contrast, when further Supplemental MTRC will be invoiced, a prior-period true-\nup adjustment is added both to the Supplemental MTRC invoiced for a later Rate Year and to the \nForecast TRBAA Credit for that same year, so the matched adjustment does not itself create an \nover- or under-recovery. Consistent with Section 6.6 of the CRA and Section 5.5 of the TO Tariﬀ, \nno interest accrues on a prior-period true-up adjustment between DesertLink and the Eligible \nCustomer.24 \nD. Formula Rate Template Revisions and Rate Treatment of Covered Upgrades \nDesertLink’s current Formula Rate Template reports plant values only in total and has no means \nof identifying facilities built to serve Large Loads. The revised Template adds Attachment 1a – \nProject Plant Detail, which reports gross plant, accumulated depreciation, Construction Work in \nProgress, unamortized abandoned plant, and net plant separately for the Harry Allen to Eldorado \nProject and each Covered Upgrade, with totals that tie to Attachment 4 and Appendix III so that \ntotal plant and the total revenue requirement are unchanged. Attachment 1 – Project Revenue \nRequirement Worksheet draws each project’s plant and depreciation from Attachment 1a, with \nallocation factors unchanged. New Line 17a on Attachment 12 – Revenue Credit Detail removes \nany TRBAA Credits recorded in revenue accounts, so those amounts are credited to customers \nonce, through the TRBAA, and not also through the Formula Rate. Attachment 1a is also added \nto the Table of Contents; there are no other changes to the Template. No changes to the \nProtocols are required because the existing posting, review, challenge, and true-up procedures \napply to the new detail.25 \nCovered Upgrades placed under CAISO’s Operational Control are included in DesertLink’s rate \nbase and Base TRR in the same manner as other DesertLink transmission plant and are subject to \nthe return components reﬂected in DesertLink’s eﬀective Formula Rate, including any generally \napplicable Commission-approved return incentive. Covered Upgrades do not receive return-on-\nequity incentives speciﬁc to the Harry Allen to Eldorado Project and are not subject to that \nproject’s Competitive Bid Concession, Binding Cost Cap, or other project-speciﬁc cost-\ncontainment commitments. Covered Upgrade costs will be separately identiﬁed on Attachment \n1a and reported as “other costs” in the commitment work paper provided under Attachment A \nto the Protocols. DesertLink is not requesting a diﬀerent return on equity or any new incentive in \nthis proceeding.26 \nE. Supporting Testimony and Illustrative Exhibits \nMr. Patrick Hayes’ testimony (Exhibit No. DLK-100) describes the Show Cause Order, the CAISO \nstakeholder process, the pro forma CRA, and the associated TO Tariff revisions, and explains how \nthose measures assign cost responsibility for Large Load-Driven Upgrades, mitigate cost shifting \n \n24  See CRA § 6.6; TO Tariﬀ § 5.5. \n25  See Ex. Nos. DLK-200 (Arzola Testimony), DLK-201, and DLK-202. \n26  See Ex. No. DLK-200 (Arzola Testimony)."},{"page":10,"startToken":4830,"endToken":5387,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 10 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nand stranded-asset risk, avoid double recovery, and promote transparency. His supporting \nexhibits provide an Illustrative MTRC Calculation (Exhibit No. DLK-101), an Example Reconciliation \nStatement (Exhibit No. DLK-102), and an Example Invoice Statement (Exhibit No. DLK-103). \nMr. D. Eric Arzola’s testimony (Exhibit No. DLK-200) explains the crediting of CRA amounts \nthrough the TRBAA, the related TO Tariff revisions, and the Formula Rate Template revisions, and \nexplains why no changes are needed to the Protocols or Appendix I. His supporting exhibits \ninclude the Clean and Marked Formula Rate Templates (Exhibit Nos. DLK-201 and DLK-202), the \nClean Formula Rate Template in native Excel format with all formulas intact (Exhibit No. DLK-\n203), an Illustrative Formula Rate Template populated with hypothetical data for the 2030 Rate \nYear (Exhibit No. DLK-204), and an Illustrative TRBAA Calculation for two consecutive TRBA years \n(Exhibit No. DLK-205). Using a hypothetical $60 million Covered Upgrade with an Annual MTRC \nof $7,292,700, projected QTR of $3,363,840, and a Supplemental MTRC of $3,928,860, those \nexhibits demonstrate that the TRBAA Credits are removed on Attachment 12, Line 17a and \nreturned to customers through the TRBAA, so that they are credited only once. \nIV. \nTHE PROPOSED REVISIONS ARE JUST AND REASONABLE \nDesertLink’s approach materially mitigates the cost-shifting concern identified in the Show Cause \nOrder. Before in-service, LLIP deposits, Construction Security, and the Pre-In-Service Termination \nCost provisions protect against cancellation and related exposure. After an upgrade enters \nservice, the Annual MTRC, Supplemental MTRC, Total Required Revenue Commitment, Required \nOperational Security, and Termination Fee establish and secure a defined twenty-year revenue \nresponsibility tied to the allocated capital cost of the identified Covered Upgrades. That design \nresponds to the concern that bilateral revenue contributions “untethered from any assessment \nof the actual cost of providing transmission service induced by individual large loads” may be \ninsufficient to protect other customers against unjustified cost shifts.27 \nThe proposal also supplies the transparency and crediting mechanisms the Commission \nidentiﬁed. The CRA Schedules, Annual Projection workpapers, Reconciliation Statements, and \nCumulative Revenue Ledger make the upgrade-speciﬁc calculations available to the Eligible \nCustomer, which has information rights under CRA Section 6.12 and dispute rights under Article \n11. Attachment 1a separately identiﬁes Covered Upgrade plant, and each annual TRBAA ﬁling is \nan FPA section 205 proceeding in which interested parties may review and challenge the TRBAA \nCredits. The LLIP further provides for study reports, a Report Meeting addressing study results \nand assigned cost responsibility, and CAISO posting of FILI Service Agreements. Customer-speciﬁc \ninformation is protected under Section 16.3 of the TO Tariﬀ, the CAISO Tariﬀ, and, in TRBAA ﬁlings, \n18 C.F.R. § 388.112. \nCrediting CRA amounts through the TRBAA ensures that Large Load payments are credited \ntoward DesertLink’s TRR. The full cost of each Covered Upgrade remains in the Base TRR, \n \n27  Show Cause Order, Comm’r Chang Concurrence at P 8."},{"page":11,"startToken":5387,"endToken":5820,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 11 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nconsistent with CAISO’s requirement that facilities under its Operational Control be included in \nthe TRR, while the TRBAA reduces the TRR paid by all customers through the TAC by the amounts \nreceived under the CRA. The TRBA ensures that DesertLink collects no more and no less than its \nBase TRR, and Attachment 12, Line 17a ensures that each dollar is credited only once. The CRA \ndoes not alter CAISO cost allocation or the retail arrangements between an Eligible Customer and \na Large Load Customer. \nFinally, the proposal is appropriately tailored to DesertLink as a non-load-serving PTO. It gives \nDesertLink a meaningful interconnection and cost-recovery role when a Large Load affects its \nfacilities, even though DesertLink has no retail relationship with the load, and requires evaluation \nof alternative transmission technologies before traditional network upgrades are selected, \nconsistent with the Commission’s focus on keeping costs at a responsible and accountable level. \nIt does not disturb the Harry Allen to Eldorado Project, DesertLink’s existing revenue \nrequirement, CAISO cost allocation, or CAISO’s study and planning authority. \nV. \nREQUESTED EFFECTIVE DATE AND WAIVERS \nDesertLink requests an effective date of January 16, 2027, sixty-one (61) days after the date of \nthis filing, satisfying the Commission’s sixty-day notice requirement.28 DesertLink requests waiver \nof the cost-of-service-statement requirements of 18 C.F.R. § 35.13, and any other Part 35 \nrequirements that otherwise may apply, to the extent necessary. The requested waivers are \nappropriate because the filing establishes a prospective interconnection and contractual \nframework, does not change the cost-of-service inputs or methods of DesertLink’s Formula Rate, \nand, absent any Covered Upgrade or CRA, produces the same revenue requirement as the \ncurrently effective Formula Rate Template. \nVI. \nCONTENTS OF FILING \nDesertLink submits the following materials: \n• This transmittal letter; \n• Attachment 1: Clean version of the DesertLink TO Tariff revisions; \n• Attachment 2: Marked version of the DesertLink TO Tariff revisions; \n• Attachment 3: Direct testimony of Patrick Hayes (Exhibit No. DLK-100) and supporting \nexhibits: \no Illustrative MTRC Calculation (Exhibit No. DLK-101),  \no Example Reconciliation Statement (Exhibit No. DLK-102), and  \no Example Invoice Statement (Exhibit No. DLK-103).  \n \n \n28  18 C.F.R. § 35.3(a)(1)."},{"page":12,"startToken":5820,"endToken":6167,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 12 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \n• Attachment 4: Direct testimony of D. Eric Arzola (Exhibit No. DLK-200) and supporting \nexhibits:  \no Clean Formula Rate Template (Exhibit No. DLK-201),  \no Marked Formula Rate Template (Exhibit No. DLK-202),  \no Clean Formula Rate Template in native Excel format with all formulas intact \n(Exhibit No. DLK-203),  \no Illustrative Formula Rate Template (Exhibit No. DLK-204), and  \no Illustrative TRBAA Calculation (Exhibit No. DLK-205). \nVII. \nCOMMUNICATIONS AND SERVICE \nDesertLink requests that all pleadings, correspondence, and other communications concerning \nthis matter be directed to the following persons, and that their names and addresses be placed \non the official service list for this proceeding: 29  \nJosh R. Robichaud \nAssociate \nBracewell LLP \n2001 M Street NW, Suite 900 \nWashington, DC 20036 \n(202) 828-1731 \njosh.robichaud@bracewell.com \nBlake R. Urban \nSenior Regulatory Counsel \nLS Power Development, LLC \n16150 Main Circle Drive, Suite 310 \nChesterfield, MO 63017 \n(636) 231-0475 \nburban@lspower.com \n \nCatherine P. McCarthy \nPartner \nBracewell LLP \n2001 M Street NW, Suite 900 \nWashington, DC 20036 \n(202) 828-5839 \ncathy.mccarthy@bracewell.com \nPatrick Hayes \nAssociate Vice President, Transmission Regulatory \nLS Power Development, LLC \n16150 Main Circle Drive, Suite 310 \nChesterfield, MO 63017 \n(636) 532-2200 \nphayes@lspower.com \nDesertLink has served a copy of this filing on CAISO, on the service list in Docket No. EL26-71-000, \nand on parties otherwise entitled to service under the Commission’s regulations. \n \n \n29 DesertLink respectfully requests waiver of Rule 203(b)(3) of the Commission’s Rules of Practice and Procedure, 18 \nC.F.R. § 385.203(b)(3), to the extent necessary to permit designation of more than two persons for service on its \nbehalf in this proceeding."},{"page":13,"startToken":6167,"endToken":6295,"text":"Hon. Debbie-Anne A. Reese \nNovember 16, 2026 \nPage 13 \n \nA U S T I N   D A L L A S   D U B A I   H O U S T O N   L O N D O N   N E W  Y O R K   P A R I S   S A N  A N T O N I O   S E A T T L E   W A S H I N G T O N ,  D C  \nVIII. \nCONCLUSION \nFor the reasons stated above and in the supporting testimony, DesertLink respectfully requests \nthat the Commission accept the proposed tariff revisions effective January 16, 2027, and grant \nany necessary waivers. \nRespectfully submitted, \n/s/ Josh R. Robichaud _  \nJosh R. Robichaud \nCatherine P. McCarthy \n      \nCounsel to DesertLink, LLC"},{"page":14,"startToken":6295,"endToken":6302,"text":"Attachment 1 \n \nDesertLink TO Tariff Revisions (Clean)"},{"page":15,"startToken":6302,"endToken":6479,"text":"DesertLink, LLC \nTransmission Owner Tariff \n \nTable of Contents \n1. \nPreamble \n1.1 \nTransmission Access for Participating TOs \n1.2 \nTransmission Access for Wheeling Customers \n1.3 \nTransmission Access for End-User \n2. \nEffective Date \n2.1 \nTermination \n3. \nTO Definitions \n3.1 \nAccess Charge \n3.2 \nAGC \n3.3 \nAncillary Services \n3.4 \nApplicable Reliability Criteria \n3.5 \nAvailable Transfer Capacity \n3.6 \nBase Transmission Revenue Requirement \n3.7 \nBlack Start \n3.8 \nBusiness Day \n3.9 \nCompleted Application Date \n3.10 \nCompleted Interconnection Application \n3.11 \nCongestion \n3.12 \nCongestion Management \n3.13 \nConverted Rights \n3.14 \nCPUC \n3.15 \nDemand \n3.16 \nDesertLink \n3.17 \nDirect Assignment Facilities \n3.18 \nDispatch \n3.19 \nDistribution System \n3.20 \nEligible Customer \n3.21 \nEncumbrance \n3.22 \nEnd-Use Customer or End-User \n3.23 \nEnergy \n3.24 \nEntitlement \n3.25 \nExisting Contracts \n3.26 \nExisting Rights \n3.27 \nExpedited Interconnection Agreement \n3.28 \nFacilities Study Agreement \n3.29 \nFacility or Facilities Study \n3.30 \nFERC \n3.31 \nFPA \n3.32 \nGenerating Unit \n3.33 \nGeneration \n3.34 \nGood Utility Practice"},{"page":16,"startToken":6479,"endToken":6697,"text":"3.35 \nGross Load \n3.36 \nHigh Voltage Access Charge \n3.37 \nHigh Voltage Transmission Facility \n3.38 \nHigh Voltage Transmission Revenue Requirement \n3.39 \nHigh Voltage Utility-Specific Rate \n3.40 \nHigh Voltage Wheeling Access Charge \n3.41 \nIndependent System Operator \n3.42 \nISO ADR Procedures \n3.43 \nISO Controlled Grid \n3.44 \nISO Protocols \n3.45 \nISO Tariff \n3.46 \nInterconnection \n3.47 \nInterconnection Agreement \n3.48 \nInterconnection Application \n3.49 \nInterest \n3.50 \nLoad \n3.51 \nLocal Publicly Owned Electric Utility \n3.52 \nLocal Regulatory Authority \n3.53 \nLocal Reliability Criteria \n3.54 \nLow Voltage Access Charge \n3.55 \nLow Voltage Transmission Revenue Requirement \n3.56 \nLow Voltage Wheeling Access Charge \n3.57 \nMarket Participant \n3.58 \nMetered Subsystem (“MSS”) \n3.59 \nNERC \n3.60 \nNew Participating TO \n3.61 \nNon-Load Serving Participating TO \n3.62 \nNon-Participating TO \n3.63 \nNon-Spinning Reserve \n3.64 \nOperational Control \n3.65 \nOriginal Participating TO \n3.66 \nParticipating TO (“PTO”) \n3.67 \nParticipating Agreement \n3.68 \nPhysical Scheduling Plant \n3.69 \nProject \n3.70 \nProject Proponent \n3.71 \nProject Sponsor \n3.72 \nRegional Transmission Group (“RTG”) \n3.73 \nRegulation \n3.74 \nRegulatory Authority \n3.75 \nReliability Criteria \n3.76 \nReliability Upgrade \n3.77 \nRequest for Expedited Interconnection Procedures \n3.78 \nScheduling Coordinator \n3.79 \nScheduling Point \n3.80 \nSpinning Reserve"},{"page":17,"startToken":6697,"endToken":6938,"text":"3.81 \nSystem Impact Study \n3.82 \nSystem Impact Study Agreement \n3.83 \nTO Tariff \n3.84 \n[Not used] \n3.85 \n[Not used] \n3.86 \nTransmission Control Agreement (“TCA”) \n3.87 \nTransmission Owner (“TO”) \n3.88 \nTransmission Revenue Balancing Account Adjustment (“TRBAA”) \n3.89 \nTransmission Revenue Credit \n3.90 \nTransmission Revenue Requirement (“TRR”) \n3.91 \nTransmission System Rights (“TSRs”) \n3.92 \nUncontrollable Force \n3.93 \nUtility Distribution Company (“UDC”) \n3.94 \nVoltage Support \n3.95 \nWestern Electricity Coordinating Council (“WECC”) \n3.96 \nWheeling Access Charge \n3.97 \nWheeling Out \n3.98 \nWheeling Through \n3.99 \nWheeling \n3.100 Wholesale Customer \n4. \nEligibility \n5. \nAccess Charges and Transmission Rates \n5.1 \nLow Voltage Access Charge \n5.2 \nWheeling Access Charge \n5.3 \nTransmission Revenue Requirement \n5.4 \nTransmission System Rights \n5.5 \nTransmission Revenue Balancing Account Adjustment \n6. \nAncillary Services - Applicability and Charges \n7. \nBilling and Payment \n8. \nObligation to Interconnect or Construct Transmission Expansions and Facility \nUpgrades \n8.1 \nParticipating TO Obligation to Interconnect \n8.2 \nParticipating TO Obligation to Construct Transmission Expansion or \nFacility Upgrades \n8.3 \nRequest for FERC Deference Regarding Need Determination \n9. \nExpansion Process \n9.1 \nDetermination of Facilities \n9.2 \nObligation to Build \n9.3 \nProvisions Relating To Transmission Construction On the Systems of \nOther TOs \n10. \nTSWL Interconnection Process \n10.1 \nApplicability \n10.2 \nApplications \n10.3 \nInterconnection Application \n10.4 \nReview of Completed Interconnection Application \n10.5 \nNotice of Need for System Impact Study"},{"page":18,"startToken":6938,"endToken":7152,"text":"10.6 \nImpact Study Cost Reimbursement Agreement \n10.7 \nSystem Impact Study Procedures \n10.8 \nNotice of Need for Facilities Study \n10.9 \nFacilities Study Procedures \n10.10 Partial Interim Service \n10.11 Expedited Interconnection Procedures \n10A. Interconnection Process for ECLL Interconnections  \n \n10A.1 Applicability  \n \n10A.2 ECLL Application and Application Fee  \n \n10A.3 Study Process and ECLL Interconnection Agreement  \n \n10A.4 Interim Service  \n \n10A.5 Co-Located Large Load  \n \n10A.6 Large Load Cost Recovery Agreement \n11. \nUncontrollable Forces and Indemnification \n11.1 \nProcedures to Follow of Uncontrollable Force Occurs \n11.2 \nIndemnification \n12. \nRegulatory Filings \n12.1 \nOpen Access \n13. \nCreditworthiness \n13.1 \nUDCs, MSSs, and Scheduling Coordinators Using the Participating \nTO’s Low Voltage Transmission Facilities \n13.2 \nEnd-Users \n14. \nDisputes \n15. \n[Reserved] \n16. \nMiscellaneous \n16.1 \nNotices \n16.2 \nWaiver \n16.3 \nConfidentiality \n16.4 \nTO Tariff Supersedes Existing Tariffs \n16.5 \nTitles \n16.6 \nSeverability \n16.7 \nPreservation of Obligations \n16.8 \nGoverning Law \n16.9 \nAppendices Incorporated \n16.10 Conflict with ISO Tariff \n16.11 Conflicting Operating Instructions \n16.12 Conflict With Transfer Capability Lease \n \nAppendix I \nTransmission Revenue Requirement and TRBAA \nAppendix II \nNotices \nAppendix III \nFormula Rate \nAppendix IV \nFormula Rate Implementation Protocols \nAppendix V \nPro Forma Large Load Cost Recovery Agreement \nAppendix VI \nLarge Load Interconnection Procedures"},{"page":19,"startToken":7152,"endToken":7580,"text":"3. \nTO Definitions. Certain capitalized terms used in this TO Tariff shall have the meanings \nset out below unless otherwise stated or the context otherwise requires. Capitalized terms \nused in this TO Tariff and not defined below shall have the meanings set out in the ISO \nTariff as it may be amended from time to time. \n \n3.1. \nAccess Charge. A charge paid by all UDCs, MSSs, and, in certain cases, Scheduling \nCoordinators delivering Energy to Gross Load, as set forth in Section 26.1 of the ISO \nTariff. The Access Charge includes the High Voltage Access Charge and the Low \nVoltage Access Charge, as applicable. \n \n3.2. \nAGC. Generation equipment that automatically responds to signals from the ISO’s EMS \ncontrol in real time to control the power output of electric generators within a prescribed \narea in response to a change in system frequency, tie-line loading, or the relation of these \nto each other, so as to maintain the target system frequency and/or the established \ninterchange with other areas within the predetermined limits. \n \n3.3. \nAncillary Services. Regulation, Spinning Reserve, Non-Spinning Reserve, Voltage \nSupport and Black Start together with such other interconnected operation services as the \nISO may develop in cooperation with Market Participants to support the transmission of \nEnergy from generation resources to Loads while maintaining reliable operation of the \nISO Controlled Grid in accordance with Good Utility Practice. \n3.4. \nApplicable Reliability Criteria. The Reliability Standards and reliability criteria \nestablished by NERC and WECC, and Local Reliability Criteria, as amended from time to \ntime, including any requirement of the Nuclear Regulatory Commission. \n3.5. \nAvailable Transfer Capacity. The available capacity of a given transmission path, in \nMW after allocation of rights associated with Existing Contracts and Transmission \nOwnership Rights, to that path’s Operating Transfer Capability established consistent \nwith ISO and WECC transmission capacity rating guidelines, as further described in \nAppendix L to the ISO Tariff. \n3.6. \nBase Transmission Revenue Requirement. The Transmission Revenue Requirement \nwhich does not reflect amounts for the TRBAA. \n \n3.7. \nBlack Start. The procedure by which a Generating Unit self-starts without an external \nsource of electricity, thereby restoring power to the ISO Controlled Grid following \nsystem or local area blackouts. \n \n3.8. \nBusiness Day. Monday through Friday, excluding federal holidays and the day after \nThanksgiving Day. \n \n3.9. \nCo-Located Large Load. A Large Load that is physically connected to the facilities of \nan existing or planned Generating Facility on the Interconnection Customer’s side of the \nPoint of Interconnection to the ISO Controlled Grid (each as defined in the ISO Tariff)."},{"page":20,"startToken":7580,"endToken":7956,"text":"3.10. Completed Application Date. The date on which a party submits an Interconnection \nApplication that satisfies the requirements of a Completed TSWL or ECLL \nInterconnection Application. \n \n3.11. Completed ECLL Interconnection Application. An ECLL Interconnection Application \nthat has been deemed valid under Section 4.3 of Appendix VI. \n \n3.12. Completed TSWL Interconnection Application. A TSWL Interconnection Application \nthat satisfies all of the information and other requirements of this TO Tariff and, if \napplicable, the information requirements as specified by the ISO and posted on the ISO \nHome Page. \n3.13. Congestion. A characteristic of the transmission system produced by a binding \nConstraint to the optimum economic dispatch to meet Demand such that the LMP, \nexclusive of Marginal Cost of Losses, at different Locations of the transmission system is \nnot equal. \n \n3.14. Congestion Management. The alleviation of Congestion in accordance with applicable \nISO Protocols and Good Utility Practice. \n \n3.15. Converted Rights. Those transmission service rights determined in accordance with \nSection 4.3.1.6 of the ISO Tariff. \n \n3.16. Cost Recovery Agreement. An agreement between the Participating TO and an Eligible \nCustomer, including an ECLL, substantially in the form of the pro forma Large Load \nCost Recovery Agreement set forth in Appendix V, entered into pursuant to Section 10.9 \nor Section 10A.6 of this TO Tariff. \n \n3.17. CPUC. The California Public Utilities Commission or its successor. \n \n3.18. Demand. The rates at which Energy is delivered to Load and Scheduling Points by \nGeneration, transmission or distribution facilities. It is the product of voltage and the in-\nphase component of alternating current measured in units of watts or standard multiples \ntherefore, e.g. 1000 W = 1 kW, 1000 kW= 1 MW, etc. \n \n3.19. DesertLink, LLC (“DesertLink”). The Delaware limited liability company that is the \nParticipating TO under this TO Tariff. \n \n3.20. Direct Assignment Facilities. Facilities or portions of facilities that are owned by the \nParticipating TO necessary to physically and electrically interconnect a particular party \nrequesting a TSWL Interconnection under this TO Tariff to the ISO Controlled Grid at the \npoint of interconnection. Direct Assignment Facilities shall be specified in the \nInterconnection Agreement that governs TSWL Interconnection service to such party and \nshall be subject to FERC approval."},{"page":21,"startToken":7956,"endToken":8380,"text":"3.21. Dispatch. The operating control of an integrated electric system to: i) assign specific \nGeneration Units and other sources of supply to effect the supply to meet the relevant \narea Demand taken as Load rises or falls; ii) control operations and maintenance of high \nvoltage lines, substations, and equipment, including administration of safety procedures; \niii) operate Interconnections; iv) manage Energy transactions with other interconnected \nControl Areas; and v) curtail Demand. \n \n3.22. Distribution System. The distribution assets of a TO, UDC, or MSS. \n \n3.23. Eligible Customer. (i) Any utility (including any Participating TO, Market Participant or \npower marketer), Federal power marketing agency, or any person generating Energy for \nsale or resale; Energy sold or produced by such entity may be Energy produced in the \nUnited States, Canada or Mexico; however, such entity is not eligible for transmission \nservice that would be prohibited by FPA Section 212(h)(2); and (ii) any retail customer \ntaking unbundled transmission service pursuant to a state retail access program or \npursuant to a voluntary offer of unbundled retail transmissions service by the \nParticipating TO. \n \n3.24. Eligible Customer for Large Load (“ECLL”). A UDC or MSS that provides retail \ntransmission and interconnection service to Large Load End-Users in the ISO’s \nBalancing Authority Area. \n \n3.25. ECLL Interconnection Agreement. The agreement between an ECLL and the \nParticipating TO governing an ECLL Interconnection. \n \n3.26. ECLL Interconnection. The interconnection of the facilities of an ECLL to the facilities \nof the Participating TO that are for the purpose of an ECLL interconnecting and \nproviding transmission service to a Large Load Customer. \n \n3.27. ECLL Interconnection Application. An application that requests an ECLL \nInterconnection to the ISO Controlled Grid. \n \n3.28. ECLL Interconnection Facilities. The facilities, additions, and upgrades of the \nParticipating TO necessary to accomplish an ECLL Interconnection, as identified in the \napplicable ECLL Interconnection Agreement. \n \n3.29. Encumbrance. A legal restriction or covenant binding on the Participating TO that \naffects the operation of any transmission lines or associated facilities and which the ISO \nneeds to take into account in exercising Operational Control over such transmission lines \nor associated facilities if the Participating TO is not to risk incurring significant liability. \nEncumbrances shall include Existing Contracts and may include: (1) other local \nrestrictions or covenants meeting the definition of Encumbrance and arising under other \narrangements entered into before the ISO Operations Date, if any; and (2) legal \nrestrictions or covenants meeting the definition of Encumbrance and arising under a \ncontract or other arrangement entered into after the ISO Operations Date."},{"page":22,"startToken":8380,"endToken":8793,"text":"3.30. End-Use Customer or End-User. A purchaser of electric power that purchases such \npower to satisfy a Load directly connected to the ISO Controlled Grid or to a Distribution \nSystem and who does not resell the power. \n3.31. Energy. The electrical energy produced, flowing, or supplied by Generation, \ntransmission, or distribution facilities, being the integral with respect to time of the \ninstantaneous power, measured in units of watt-hours or standard multiples thereof. \n3.31.1.1. \nE.g. 1000 Wh = 1 kW, 1000 kWh = 1 MWh, etc. \n \n3.32. Entitlement. The right of a Participating TO obtained through contract or other means to \nuse another entity’s transmission facilities for the transmission of Energy. \n \n3.33. Existing Contracts. Those transmission service agreements or other contracts which \ngrant transmission service rights in existence on the ISO Operations Date (including any \ncontracts entered into pursuant to such contracts) as may be amended in accordance with \ntheir terms or by agreement between the parties thereto from time to time. \n \n3.34. Existing Rights. Those transmission service rights defined in Section 16.1 of the ISO \nTariff. \n \n3.35. Expedited Interconnection Agreement. A contract between a party which has \nsubmitted a Request for Expedited Interconnection Procedures and the Participating TO \nunder which the Participating TO agrees to process, on an expedited basis, the Completed \nInterconnection Application of such party and which sets forth the terms, conditions, and \ncost responsibilities for such Interconnection. \n \n3.36. Facilities Study Agreement. An agreement between a Participating TO and either a party \nrequesting Interconnection to the ISO Controlled Grid, Market Participants, Project \nSponsor, ECLL, or identified principal beneficiaries pursuant to which the party \nrequesting such Interconnection agrees to reimburse the Participating TO for the cost of \nperforming or reviewing a Facilities Study. \n \n3.37. Facility or Facilities Study. An engineering study conducted to determine required \nmodifications to the Participating TO’s transmission system, including the estimated cost \nand scheduled completion date for such modifications, that will be required to provide \nneeded services. \n \n3.38. FERC. The Federal Energy Regulatory Commission, or its successor. \n \n3.39. Firm Interconnection Service. The highest quality (priority) load Interconnection \nservice that provides the on-going safe and reliable operation and maintenance of, and the \nParties’ rights and responsibilities associated with their facilities. \n \n3.40. Flexible Interim Load Interconnection (“FILI”) Service. A transmission \ninterconnection service offered by the Participating TO and accepted by an Eligible \nCustomer on behalf of a Large Load retail customer to manage operational constraints on"},{"page":23,"startToken":8793,"endToken":9257,"text":"withdrawals from the transmission system while the interconnection and system upgrades \nnecessary to provide Firm Interconnection Service are being developed. \n \n3.41. FILI Service Agreement. The agreement developed by the Participating TO pursuant to \nSection 10A.4 that sets forth the terms, conditions, and operating requirements for FILI \nService. \n3.42. FPA. The Federal Power Act, 16 U.S.C.§ 791a et seq., as it may be amended from time to \ntime. \n \n3.43. Generating Facility. An Interconnection Customer’s Generating Unit(s) used for the \nproduction and/or storage for later injection of electricity identified in the Interconnection \nRequest, but shall not include the Interconnection Customer’s Interconnection Facilities. \n \n3.44. Generating Unit. An individual electric generator and its associated plant and apparatus \nwhose electrical output is capable of being separately identified and metered or a \nPhysical Scheduling Plant, that, in either case, is: (a) located within the ISO Control \nArea; (b) connected to the ISO Controlled Grid, either directly or via interconnected \ntransmission or distribution facilities; and (c) that is capable of producing and delivering \nnet Energy (Energy in excess of a generation stations’ internal power requirements). \n \n3.45. Generation. Energy delivered from a Generating Unit. \n \n3.46. Generator Interconnection. The interconnection of one or more Generating Units to the \nISO Controlled Grid facilities owned by the Participating TO. \n \n3.47. Good Utility Practice. Any of the practices, methods, and acts engaged in or approved \nby a significant portion of the electric utility industry during the relevant time period, or \nany of the practices, methods, and acts which, in the exercise of reasonable judgment in \nlight of the facts known at the time the decision was made, could have been expected to \naccomplish the desired result at a reasonable cost consistent with good business practices, \nreliability, safety, and expedition. \n \n3.48. Gross Load. For purposes of calculating the transmission Access Charge, Gross Load is \nall Energy (adjusted for distribution losses) delivered for the supply of End-Use \nCustomer Loads directly connected to the transmission facilities or directly connected to \nthe Distribution System of a Utility Distribution Company or MSS Operator located in a \nPTO Service Territory. Gross Load shall exclude (1) Load with respect to which the \nWheeling Access Charge is payable, (2) Load that is exempt from the Access Charge \npursuant to Section 4.1, Appendix I of the ISO Tariff, and the portion of the load of an \nindividual retail customer of a Utility Distribution Company, Small Utility Distribution \nCompany or MSS Operator that is served by a Generating Unit that: (a) is located on the \ncustomer’s site or provides service to the customer’s site through over-the-fence \narrangements as authorized by Section 218 of the California Public Utilities Code; (b) is a \nqualifying small power production facility or qualifying cogeneration facility, as those"},{"page":24,"startToken":9257,"endToken":9706,"text":"terms are defined in the FERC’s regulations implementing Section 201 of the Public \nUtility Regulatory Policies Act of 1978; and (c) secures Standby Service from the \nParticipating TO under terms approved by a Local Regulatory Authority or FERC, as \napplicable, or can be curtailed concurrently with an Outage of the Generating Unit \nserving the Load. Gross Load forecasts consistent with filed Transmission Revenue \nRequirements will be provided by each Participating TO to the ISO. \n \n3.49. High Voltage Access Charge. A component of the Access Charge determined by the \nISO under Section 26.1 of the ISO Tariff. \n \n3.50. High Voltage Transmission Facility. A transmission facility under the Operational \nControl of the ISO that is owned by the Participating TO or to which the Participating TO \nhas an Entitlement that may be associated with a Converted Right, which operates at a \nvoltage at or above 200 kilovolts, and supporting facilities, and the costs of which are not \ndirectly assigned to one or more specific customers. \n3.51. High Voltage Transmission Revenue Requirement. The portion of the Participating \nTO’s TRR associated with and allocable to the Participating TO’s High Voltage \nTransmission Facilities and Rights associated with High Voltage Transmission Facilities \n3.52. High Voltage Utility-Specific Rate. The Participating TO’s High Voltage Transmission \nRevenue Requirement divided by the Participating TO’s forecast of its Gross Load. \n \n3.53. High Voltage Wheeling Access Charge. The Wheeling Access Charge assessed by the \nISO associated with the recovery of the Participating TO’s High Voltage Transmission \nRevenue Requirement in accordance with Section 26.1 of the ISO Tariff. \n \n3.54. Independent System Operator (“ISO”). The California Independent System Operator \nCorporation, a state chartered, nonprofit corporation that controls the transmission \nfacilities of all Participating TOs and dispatches certain Generating Units and Loads. \n3.55. ISO ADR Procedures. The procedures for resolution of disputes or differences set out in \nSection 13 of the ISO Tariff, as amended from time to time. \n3.56. ISO Controlled Grid. The system of transmission lines and associated facilities of the \nParticipating TOs that have been placed under the ISO’s Operational Control. \n \n3.57. ISO Protocols. The rules, protocols, procedures and standards promulgated by the ISO \n(as amended from time to time) to be complied with by the ISO Scheduling Coordinators, \nParticipating TOs and all other Market Participants in relation to the operation of the ISO \nControlled Grid and the participation in the markets for Energy and Ancillary Services in \naccordance with the ISO Tariff. \n \n3.58. ISO Tariff. The California Independent System Operator Agreement and Tariff, dated \nNovember 1, 2013, as it may be modified from time to time. \n \n3.59. Interconnection Agreement. A contract between a party requesting a TSWL"},{"page":25,"startToken":9706,"endToken":10131,"text":"Interconnection and  a Participating TO, as it may be amended from time to time, and, for \nan ECLL Interconnection, the ECLL Interconnection Agreement. \n \n3.60. Interest. Interest shall be calculated in accordance with the methodology specified for \ninterest on refunds in the regulations of FERC at 18 C.F.R. § 35.19a. Interest on \ndelinquent amounts shall be calculated from the due date of the bill to the date of \npayment. When payments are made by mail, bills shall be considered as having been paid \non the date of receipt. Notwithstanding the foregoing, interest, if any, on amounts payable \nor refundable between the Participating TO and a party to a Cost Recovery Agreement \nshall be governed solely by that Cost Recovery Agreement. \n \n3.61. Interim Firm Interconnection Service. Interconnection service that can be provided, if \nany, on a firm basis prior to the completion of the ECLL Interconnection Facilities and an \nauthorization for the Large Load to withdraw Energy. \n \n3.62. Large Load. An End-User located at a single site behind one or more Point(s) of \nWithdrawal from the ISO Controlled Grid and that has a peak load of 50 MW or greater. \n \n3.63. Load. An end-use device of an End-Use Customer that consumes power. Load should \nnot be confused with Demand, which is the measure of power that a Load receives or \nrequires. \n \n3.64. Local Publicly Owned Electric Utility. A municipality or municipal corporation \noperating as a public utility furnishing electric service, a municipal district furnishing \nelectric services, or a joint powers authority that includes one or more of these agencies \nand that owns Generation or transmission facilities, or furnishes electric services over its \nown or its members’ electric Distribution System. \n \n3.65. Local Regulatory Authority. The state or local governmental authority responsible for \nthe regulation or oversight of a utility. \n \n3.66. Local Reliability Criteria. Reliability criteria established by the ISO, unique to the \ntransmission systems of each of the Participating TOs, as they may be updated from time \nto time. \n \n3.67. Low Voltage Access Charge. The Access Charge applicable under Section 26.1 of the \nISO Tariff to recover the Low Voltage Transmission Revenue Requirement of the \nParticipating TO. \n \n3.68. Low Voltage Transmission Revenue Requirement. The portion of the Participating \nTO’s TRR associated with and allocable to the Participating TO’s Low Voltage \nTransmission Facilities and Converted Rights associated with Low Voltage Transmission \nFacilities. \n \n3.69. Low Voltage Wheeling Access Charge. The Wheeling Access Charge associated with \nthe recovery of the Participating TO’s Low Voltage Transmission Revenue Requirement"},{"page":26,"startToken":10131,"endToken":10595,"text":"in accordance with Section 26.1 of the 1SO Tariff. \n \n3.70. Market Participant. An entity, including a Scheduling Coordinator, who participates in \nthe Energy marketplace through the buying, selling, transmission, or distribution of Energy \nor Ancillary Services into, out of, or through the ISO Controlled Grid. \n \n3.71. Metered Subsystem (“MSS”). A geographically contiguous system, located within a \nsingle zone which has been operating as an electric utility for a number of years prior to \nthe ISO Operations Date as a municipal utility, water district, irrigation district, state \nagency or federal power marketing authority subsumed within the ISO Balancing \nAuthority Area and encompassed by ISO certified revenue quality meters at each \ninterface point with the ISO Controlled Grid and ISO-certified revenue quality meters on \nall Generating Units or, if aggregated, each individual resource and Participating Load, \nReliability Demand Response Resource, and Proxy Demand Resource internal to the \nsystem, which is operated in accordance with a MSS agreement described in Section 4.9.1 \nof the ISO Tariff. \n \n3.72. NERC. The North American Electric Reliability Corporation or its successor. \n \n3.73. New Participating TO. A Participating TO that is not an Original Participating TO. \n \n3.74. Non-Load-Serving Participating TO. A Participating TO that does not serve Load. \n \n3.75. Non-Participating TO. A TO that is not a party to the TCA or, for the purpose of Section \n16.1 of the ISO Tariff, the holder of transmission service rights under an Existing \nContract that is not a Participating TO. \n3.76. Non-Spinning Reserve. The portion of off-line generating capacity that is capable of \nbeing synchronized and ramping to a specified load in ten minutes (or load that is capable \nof being interrupted in ten minutes) and that is capable of running (or being interrupted) \nfor at least two hours. \n \n3.77. Operational Control. The rights of the ISO under the Transmission Control Agreement \nand the ISO Tariff to direct Participating TOs how to operate their transmission lines and \nfacilities and other electric plant affecting the reliability of those lines and facilities for \nthe purpose of affording comparable nondiscriminatory transmission access and meeting \nApplicable Reliability Criteria. \n \n3.78. Original Participating TO. A Participating TO that was a Participating TO as of \nJanuary 1, 2000. The Original Participating TOs are Pacific Gas and Electric Company, \nSouthern California Edison Company, and San Diego Gas & Electric Company. \n3.79. Participating TO (“PTO”). A party to the TCA whose application under Section 2.2 of \nthe TCA has been accepted and who has placed, or expects to place, its transmission \nassets and/or Entitlements under the ISO’s Operational Control in accordance with the \nTCA. A PTO may be an Original Participating TO or a New Participating TO. For the \npurposes of this Tariff, the Participating TO is DesertLink."},{"page":27,"startToken":10595,"endToken":11091,"text":"3.80. Participation Agreement. An agreement between a Participating TO and a Project \nSponsor that specifies the terms and conditions under which the Participating TO will \nconstruct a transmission addition or upgrade on behalf of the Project Sponsor. \n3.81. Physical Scheduling Plant. A group of two or more related Generating Units each of \nwhich is individually capable of producing Energy, but which either by physical \nnecessity or operational design must be operated as if they were a single Generating Unit \nand any Generating Unit or Units containing related multiple generating components \nwhich meet one or more of the following criteria: (i) multiple generating components are \nrelated by a common flow of fuel which cannot be interrupted without substantial loss of \nefficiency of the combined output of all components; (ii) the Energy production from one \ncomponent necessarily causes Energy production from other components; (iii) the \noperational arrangement of related multiple generating components determines the \noverall physical efficiency of the combined output of all components; (iv) the level of \ncoordination required to schedule individual generating components would cause the ISO \nto incur scheduling costs far in excess of the benefits of having scheduled such individual \ncomponents separately; or (v) metered output is available only for the combined output of \nrelated multiple generation components and separate generating component metering is \neither impractical or economically inefficient. \n \n3.82. Point of Withdrawal. Point(s) within the ISO Balancing Authority Area, or for purposes \nof scheduling and operating the Day Ahead Market only, the EDAM Area where Energy \nand Ancillary Services are made available to a receiving party under the ISO Tariff, for \npurposes of scheduling and operating the Real-Time Market only, the EIM Area where \nEnergy and Ancillary Services are made available to a receiving party under the ISO \nTariff, or for purposes of the definition of Large Load only, the point(s) where a non-\ntransmission facility that is used to withdraw Energy from the ISO Controlled Grid to \nserve an End-User connects to the ISO Controlled Grid. \n \n3.83. Project. DesertLink’s interest in the single-circuit 500 kV (AC) overhead transmission \nline connecting the existing Harry Allen Substation in Nevada to the existing Eldorado \nSubstation in Nevada, including series compensation. For the avoidance of doubt, the \nProject does not include any required work within the fence line of each substation. \n \n3.84. Project Proponent. A Market Participant or group of Market Participants that (i) \nadvocates a transmission addition or upgrade; (ii) is unwilling to pay the full cost of the \nproposed transmission addition or upgrade, and thus is not a Project Sponsor; and (iii) \ninitiates proceedings under the ISO ADR Procedures to determine the need for the \nproposed transmission addition or upgrade. \n \n3.85. Project Sponsor. A Market Participant or group of Market Participants or a Participating \nTO that proposes the construction of a transmission addition or upgrade in accordance with \nSection 24 of the ISO Tariff. \n \n3.86. Regional Transmission Group (“RTG”). A voluntary organization approved by FERC"},{"page":28,"startToken":11091,"endToken":11540,"text":"and composed of transmission owners, transmission users, and other entities, organized to \nefficiently coordinate the planning, expansion, and use of transmission on a regional and \ninter-regional basis. \n3.87. Regulation. The service provided either by Generating Units certified by the ISO as \nequipped and capable of responding to the ISO’s direct digital control (AGC) signals, or \nby System Resources that have been certified by the ISO as capable of delivering such \nservice to the ISO Balancing Authority Area, in an upward and downward direction to \nmatch, on a Real Time basis, Demand and resources, consistent with established NERC \nand WECC reliability standards, including any requirements of the Nuclear Regulatory \nCommission. Regulation is used to control the Power output of electric generators within \na prescribed area in response to a change in system frequency, tie-line loading, or the \nrelation of these to each other so as to maintain the target system frequency and/or the \nestablished interchange with other Balancing Authority Areas within the predetermined \nRegulation Limits. Regulation includes both the increase of output by a Generating unit \nor System Resource (Regulation Up) and the decrease in output by a Generating unit or \nSystem Resource (Regulation Down). Regulation Up and Regulation Down are distinct \ncapacity products, with separately stated requirements and ASMPs in each Settlement \nPeriod. \n \n3.88. Regulatory Authority. The Federal Energy Regulatory Commission. \n \n3.89. Reliability Criteria. Pre-established criteria that are to be followed in order to \nmaintain desired performance of the ISO Controlled Grid under contingency or steady \nstate conditions. \n \n3.90. Reliability Upgrade. The transmission facilities, other than Direct Assignment Facilities, \nbeyond the first point of Interconnection necessary to accomplish a TSWL \nInterconnection safely and reliably to the ISO Controlled Grid, which would not have \nbeen necessary but for the TSWL Interconnection, including network upgrades necessary \nto remedy short circuit or stability problems resulting from the TSWL Interconnection. \nReliability Upgrades also include, consistent with WECC practice, the facilities necessary \nto mitigate any adverse impact a TSWL Interconnection may have on a path’s WECC \npath rating. Reliability Upgrades shall be specified in the Interconnection Agreement that \ngoverns a TSWL Interconnection and shall be subject to FERC approval. \n \n3.91. Requests for Expedited Interconnection Procedures. A written request by which an \napplicant for Interconnection can request expedited processing of its TSWL \nInterconnection Application. \n \n3.92. Scheduling Coordinator. An entity certified by the ISO for the purpose of undertaking \nthe functions specified in Section 4.5 of the ISO Tariff. \n \n3.93. Scheduling Point. A location at which the ISO Controlled Grid or a transmission facility \nowned by a Transmission Ownership Right holder is connected, by a group of \ntransmission paths for which a physical, non-simultaneous transmission capacity rating"},{"page":29,"startToken":11540,"endToken":11940,"text":"has been established for Congestion Management, to transmission facilities that are \noutside the ISO’s Operational Control. \n \n3.94. Site Control. An ECLL may demonstrate that its Large Load Customer has Site Control \nby:  \nan option for a lease or an executed lease for real property of sufficient size to house the Large \nLoad; or  \nan option to purchase or title to real property of sufficient size to house the Large Load. \n \n3.95. Spinning Reserve. The portion of unloaded synchronized generating capacity that is \nimmediately responsive to system frequency and that is capable of being loaded in ten \nminutes, and that is capable of running for at least two hours. \n3.96. System Impact Study. An engineering study conducted to determine whether a request \nfor Interconnection to the ISO Controlled Grid would require new transmission additions, \nupgrades, or other mitigation measures. \n \n3.97. System Impact Study Agreement. An agreement between a Participating TO and an \nentity that has requested Interconnection to the Participating TO’s transmission system \npursuant to which the entity requesting Interconnection agrees to reimburse the \nParticipating TO for the cost of performing or reviewing a System Impact Study. \n \n3.98. TO Tariff. This Transmission Owner Tariff, as it may be amended or superseded. \n \n3.99. [Reserved]. \n3.100. [Reserved]. \n3.101. Transmission Control Agreement (“TCA”). The agreement between the ISO and \nParticipating TOs establishing the terms and conditions under which TOs will become \nParticipating TOs and how the ISO and each Participating TO will discharge its \nrespective duties and responsibilities, as may be modified from time to time. \n \n3.102. Transmission Owner (“TO”). An entity owning transmission facilities or having firm \ncontractual rights to use transmission facilities. \n \n3.103. Transmission Revenue Balancing Account Adjustment (“TRBAA”). A mechanism \nestablished by the Participating TO which will ensure that all Transmission Revenue \nCredits and other credits specified in Section 6 and 8 of Appendix F, Schedule 3 of the \nISO Tariff, and all amounts that a Cost Recovery Agreement requires to be credited \nthrough the TRBAA, flow through to ISO Tariff and TO Tariff transmission customers. \n \n3.104. Transmission Revenue Credit. The proceeds received from the ISO (other than for the \nrecovery of the Participating TO’s High Voltage and Low Voltage Transmission Revenue \nRequirement through the High Voltage and Low Voltage Transmission Access Charges) \nand charges imposed by the ISO that are received and paid by the Participating TO in its"},{"page":30,"startToken":11940,"endToken":12367,"text":"role as Participating TO, as defined in the ISO Tariff. \n3.105. Transmission Revenue Requirement (“TRR’). The total annual authorized revenue \nrequirement associated with transmission facilities and Entitlements turned over to the \nOperational Control of the ISO by the Participating TO. The costs of any transmission \nfacility turned over to the Operational Control of the ISO shall be fully included in the \nParticipating TO’s TRR. The TRR includes the costs of transmission facilities and \nEntitlements and deducts Transmission Revenue Credits and is shown in Appendix I. \n \n3.106. Transmission System Rights (“TSRs”). TSRs represent DesertLink’s exclusive \ntransmission entitlement on its share of the Project. DesertLink, as the holder of the \nTSRs, is entitled to all associated rights as are available under the ISO Tariff and \nProtocols. The use of this definition does not limit DesertLink from seeking any \nadditional revenues or rights that are authorized by FERC due to a beneficial increase in \nthe ISO controlled grid capacity resulting from the Project. \n \n3.107. Transmission System Wholesale Load (“TSWL”) Interconnection. The \ninterconnection of the transmission facilities of the Participating TO to the transmission \nfacilities of a Transmission Owner, electric utility, or other entity eligible to request \ninterconnection. A TSWL Interconnection does not include a Generator Interconnection \nor an ECLL Interconnection. \n \n3.108. TSWL Interconnection Application. An application that requests a TSWL \nInterconnection to the ISO Controlled Grid, including any modifications to existing \npoints of interconnection. \n \n3.109. Uncontrollable Force. Any act of God, labor disturbance, act of the public enemy, war, \ninsurrection, riot, fire, storm, flood, earthquake, explosion, any curtailment, order, \nregulation or restriction imposed by governmental, military or lawfully established \ncivilian authorities or any other cause beyond the reasonable control of the ISO or Market \nParticipant, as the case may be, which could not be avoided through the exercise of Good \nUtility Practice. \n \n3.110. Utility Distribution Company (“UDC”). An entity that owns a Distribution System for \nthe delivery of Energy to and from the ISO Controlled Grid, and/or that provides \nregulated retail electric service to End-Users. \n3.111. Voltage Support. Services provided by Generating Units or other equipment such- as \nshunt capacitors, static vat compensators, or synchronous condensers that are required to \nmaintain established grid voltage criteria. This service is required under normal or system \nemergency conditions. \n \n3.112. Western Electricity Coordinating Council (“WECC”). The Western Electricity \nCoordinating Counsel or its successor. \n \n3.113. Wheeling Access Charge. The charge assessed by the ISO that is paid by a Scheduling \nCoordinator for Wheeling in accordance with Section 26.1.4.1 of the ISO Tariff."},{"page":31,"startToken":12367,"endToken":12564,"text":"Wheeling Access Charges shall not apply for Wheeling under a bundled non-economy \nEnergy coordination agreement of a Participating TO executed prior to July 9, 1996. The \nWheeling Access Charge consists of a High Voltage Wheeling Access Charge and, if \napplicable, a Low Voltage Wheeling Access Charge. \n \n3.114. Wheeling Out. Except for Existing Rights exercised under an Existing Contract in \naccordance with Section 16.1 of the ISO Tariff, the use of the ISO Controlled Grid for the \ntransmission of Energy from a Generating Unit located within the ISO Controlled Grid to \nserve a Load located outside the transmission and Distribution System of a Participating \nTO. \n3.115. Wheeling Through. Except for Existing Rights exercised under an Existing Contract in \naccordance with Section 16.1 of the ISO Tariff, the use of the ISO Controlled Grid for the \ntransmission of Energy from a resource located outside the ISO Controlled Grid to serve \na Load located outside the transmission and Distribution System of a Participating TO. \n3.116. Wheeling. Wheeling Out or Wheeling Through. \n \n3.117. Wholesale Customer. A person wishing to purchase Energy and Ancillary Services at a \nBulk Supply Point or a Scheduling Point for resale."},{"page":32,"startToken":12564,"endToken":12638,"text":"4. \nEligibility for Service. Transmission service over a Participating TO’s system shall be \nprovided only to Eligible Customers for transmission service under the ISO Tariff. Any \ndispute as to whether an entity that resells power is eligible for an interconnection under \nthis TO Tariff shall be resolved by the FERC. Any dispute as to whether an End-User is \neligible for an interconnection under this TO Tariff will be resolved by the Local \nRegulatory Authority."},{"page":33,"startToken":12638,"endToken":13095,"text":"5. \nAccess Charges and Transmission Rates. The applicable Access Charges are \nprovided in the ISO Tariff. \n \n5.1 \nLow Voltage Access Charge. The Low Voltage Access Charge shall be determined in \naccordance with the ISO Tariff. As DesertLink is a Non-Load- Serving Participant TO, \nthe ISO shall charge for and collect the Low Voltage Access Charge on DesertLink’s \nbehalf pursuant to Section 26.1 and Appendix F, Schedule 3, Section 13 of the ISO \nTariff from the Participating TO to whose facilities DesertLink’s Low Voltage \nTransmission Facilities are directly connected. The rate for DesertLink’s Low Voltage \nAccess Charge Shall be DesertLink’s Low Voltage Transmission Revenue Requirement \ndivided by the forecasted Gross Load of the Participating TO that is the Low Voltage \nAccess Charge customer. The Low Voltage Access Charge customer shall pay the ISO a \nLow Voltage Access Charge equal to the product of DesertLink’s Low Voltage Access \nCharge rate and the actual Gross Load of the Participating TO that is the Low Voltage Access \nCharge Customer. \n \n5.2 \nWheeling Access Charge. The Wheeling Access Charge shall be determined in \naccordance with the ISO Tariff. The Wheeling Access Charge assessed by the ISO \nconsists of a High Voltage Wheeling Access Charge and, if applicable, a Low Voltage \nWheeling Access Charge. The High Voltage Wheeling Access Charge is set forth in the \nISO Tariff. \n \n5.3 \nTransmission Revenue Requirement. As set forth in the ISO Tariff, the Transmission \nRevenue Requirement for each Participating TO is used to develop the Access Charges \nset forth in the ISO Tariff and is used by the ISO to calculate the disbursement of \nWheeling revenues among Participating TOs. Wheeling revenues are disbursed by the \nISO to Participating TOs pursuant to Section 26.1.4.3 of the ISO Tariff. DesertLink’s \nTRR is set forth in Appendix I. \n \n5.4 \nTransmission System Rights. DesertLink owns the TSRs with respect to the Project \nconsistent with its ownership percentage of the Project and owns the TSRs with respect \nto any subsequent project it develops. \n \n5.5 \nTransmission Revenue Balancing Account Adjustment (“TRBAA”). The \nParticipating TO shall maintain a Transmission Revenue Balancing Account with an \nannual TRBAA that will ensure that all Transmission Revenue Credits and adjustments \nfor any over-or under-recovery of its annual Transmission Revenue Requirement, if \nany, specified in Sections 6, 8 and 13 of Appendix F, Schedule 3 of the ISO Tariff, \nflow through to transmission customers. The TRBAA used to calculate the High \nVoltage Revenue Requirement shall include other adjustments specified in Appendix F, \nSchedule 3, Sections 6, 8 and 13 of the ISO Tariff. The TRBAA shall also ensure that \nall amounts that a Cost Recovery Agreement requires to be credited to transmission \ncustomers through the TRBAA flow through to transmission customers."},{"page":34,"startToken":13095,"endToken":13379,"text":"The TRBAA shall be equal to: \nTRBAA = Cr + Cf + I \nWhere: \n \nCr = \nThe principal balance in the Transmission Revenue Balancing Account \n(“TRBA”) recorded in FERC Account No. 254 as of September 30 of the \nyear prior to commencement of the January billing cycle. This balance \nrepresents the unamortized balance in the TRBA from the previous \nperiod and the difference in the amount of revenues or expenditures from \nTransmission Revenue Credits, amounts recorded in the TRBA under \nany Cost Recovery Agreement, and any over- or under-recovery of its \nannual Transmission Revenue Requirement and the amount of such \nrevenues or expenditures that has been refunded to or collected from \ncustomers through operation of the TRBAA; \n \nCf = \nThe forecast of Transmission Revenue Credits, if any, for the \nfollowing calendar year, plus any forecast credit that a Cost \nRecovery Agreement requires to be included in the TRBAA \nfor the following calendar year;  \n \nI = \nThe interest balance for the TRBA, which shall be calculated \nusing the interest rate pursuant to Section 35.19a of FERC’s \nregulations under the Federal Power Act (18 CFR Section \n35.19a). Interest shall be calculated based on the average \nTRBA principal balance each month, compounded quarterly. \nAmounts recorded in the TRBA under any Cost Recovery \nAgreement shall be included in the TRBA principal balance \nfor purposes of this calculation. Nothing in this Section 5.5 \nrequires the payment of interest between the Participating \nTO and a party to a Cost Recovery Agreement on amounts \npayable or refundable under that agreement, which shall be \ngoverned solely by the terms of the Cost Recovery \nAgreement; and \n \nThe DesertLink TRBAA, calculated in accordance with the ISO Tariff and \napproved by the FERC, is stated in Appendix I."},{"page":35,"startToken":13379,"endToken":13819,"text":"8. \nObligation to Interconnect or Construct Transmission Expansions and \nFacility Upgrades. Unless DesertLink is the lead Participating TO with \nrespect to an Interconnection, the provisions of Section 8 of this TO Tariff, \nand its subparts, shall have no application to the Project or any other High \nVoltage Transmission Facilities, Low Voltage Transmission Facilities, or \nEntitlements turned over to the ISO’s operational control by DesertLink, and \nthe corresponding provisions of the lead Participating TO’s TO Tariff shall \ngovern. \n \n8.1 \nParticipating TO Obligation to Interconnect. The Participating TO shall, at \nthe request of a third party, interconnect its system to the wholesale generation \nor Load of such third party, or modify an existing wholesale Interconnection. \nInterconnections under this TO Tariff shall be available to entities eligible to \nrequest Interconnection consistent with the provisions of Section 210(a) of the \nFPA. The procedures for the Interconnections of Load to the ISO Controlled \nGrid shall be governed by this TO Tariff and the ISO Tariff. The procedures \nfor Interconnection of wholesale generation to the ISO Controlled Grid shall \nbe governed by the ISO Tariff. \n \n8.1.1 Interconnection to Transmission System. Any interconnection must \nbe consistent with Good Utility Practice, in conformance with all \nApplicable Reliability Criteria, all applicable statutes, regulations, and \nISO reliability criteria for the ISO Controlled Grid. The Participating \nTO will not accommodate the interconnection if doing so would impair \nsystems reliability, or would otherwise impair the ability of the \nParticipating TO to honor its Encumbrances existing as of the time an \nentity submits its interconnection application. The Participating TO \nshall identify any such adverse effect on its Encumbrances in the \ninterconnection studies. To the extent the Participating TO determines \nthat the interconnection will have an adverse effect on Encumbrances, \nthe party requesting interconnection shall mitigate such adverse effect. \n \n8.1.1.1 Letter Agreement for Generator Interconnections. Pursuant to \nSection 12 of Appendix DD or KK of the ISO Tariff, prior to executing \na Generator Interconnection Agreement, a party seeking a Generator \nInterconnection may, in order to advance the implementation of its \nInterconnection, request, and the Participating TO shall offer the party, \na Letter Agreement that authorizes the Participating TO to begin \nengineering, design, and procurement of long lead-time items, or \nconstruction necessary for the establishment of the Generator \nInterconnection. However, the Participating TO shall not be obligated \nto offer a Letter Agreement if the party seeking Generator \nInterconnection is in Dispute Resolution as a result of an allegation \nthat the party seeking Interconnection has failed to meet any \nmilestones or comply with any prerequisites specified in the ISO \nTariff. The Letter Agreement is an optional procedure. The Letter"},{"page":36,"startToken":13819,"endToken":14257,"text":"Agreement shall provide for the party seeking Generator \nInterconnection to pay the cost of all activities authorized by the party \nand to make advance payments or provide other satisfactory security \nfor such costs. \n \n \nFollowing a party seeking Interconnection’s request for a Letter \nAgreement, the Participating TO shall prepare and tender to the party \nseeking Interconnection a draft Letter Agreement, including draft \nexhibits that include the proposed scope of work, estimated costs, \npayments, financial security and milestones, as applicable. The party \nseeking Generator Interconnection shall provide written comments, or \nnotification of no comments, to the draft exhibits within thirty (30) \nCalendar Days. The Participating TO and the party seeking \nInterconnection shall negotiate concerning any disputed provisions of \nthe exhibits to the draft Letter Agreement for not more than ninety (90) \nCalendar Days after the Participating TO tenders the draft Letter \nAgreement to the party seeking Generator Interconnection. If the party \nseeking Interconnection determines that negotiations are at an impasse, \nit may request termination of the negotiations at any time after tender \nof the draft Letter Agreement and request submission of the \nunexecuted Letter Agreement with FERC or initiate dispute resolution \nprocedures pursuant to Section 14 of this TO Tariff. If the party \nseeking Generator Interconnection requests termination of the \nnegotiations, but within ninety (90) Calendar Days after the \nParticipating TO tenders the draft Letter Agreement to the party \nseeking Interconnection, fails to request either the filing of the \nunexecuted Letter Agreement or initiate dispute resolution procedures, \nit shall be deemed to have withdrawn its request for a Letter \nAgreement and the Participating TO shall have no further obligation to \nenter into a Letter Agreement, unless an extension is mutually agreed \nto by the parties. The Participating TO shall provide to the party \nseeking Interconnection a final Letter Agreement within fifteen (15) \nBusiness Days after the completion of the negotiation process. \n \n \nFollowing submission of the final Letter Agreement to the party \nseeking Generator Interconnection, the party shall either: (i) execute \ntwo originals of the tendered Letter Agreement and return them to the \nParticipating TO; or (ii) request in writing that the Participating TO file \nwith FERC a Letter Agreement in unexecuted form. As soon as \npracticable, but not later than ten (10) Business Days after receiving \neither the two executed originals of the tendered Letter Agreement or \nthe request to file an unexecuted Letter Agreement, the Participating \nTO shall file the Letter Agreement with FERC, together with its \nexplanation of any matters as to which the party seeking \nInterconnection and the Participating TO disagree and support for the \ncosts that the Participating TO proposes to charge to the party seeking"},{"page":37,"startToken":14257,"endToken":14635,"text":"Generator Interconnection under the Letter Agreement. An unexecuted \nLetter Agreement should contain terms and conditions deemed \nappropriate by the Participating TO for the Generator Interconnection \nrequest. \n \n \nIf the party seeking Interconnection executes the final Letter \nAgreement, the Participating TO and the party seeking Generator \nInterconnection shall perform their respective obligations in \naccordance with the terms of the Letter Agreement, subject to \nmodification by FERC. Upon submission of an unexecuted Letter \nAgreement, the party seeking Generator Interconnection and the \nParticipating TO shall promptly comply with the unexecuted Letter \nAgreement, subject to modification by FERC. \n \n8.1.2 Costs Associated with Interconnection. Each party requesting \nInterconnection shall pay the costs of planning, installing, owning, \noperating, and maintaining any Direct Assignment Facilities and, if \napplicable, any Reliability Upgrades required to provide the requested \nInterconnection. In addition, such party shall implement all existing \noperating procedures necessary to safely and reliability interconnect \nsuch party’s generation or wholesale load to the facilities of the \nParticipating TO and to ensure the ISO Controlled Grid’s conformance \nwith the ISO Grid Planning Criteria, and shall bear all costs of \nimplementing such operating procedures. Any additional costs \nassociated with accommodating the Interconnection shall be allocated \nin accordance with the cost responsibility methodology set forth in the \nISO Tariff for transmission expansions or upgrades. \n \n8.1.3 Interconnection Agreement. Interconnection Agreements shall be \ntendered, executed, and filed as provided in Sections 10.9 and 10A.3. \n  \n8.1.4 Due Diligence to Construct. The Participating TO shall use due \ndiligence to construct, within a reasonable time, any Direct Assignment \nFacilities and any Reliability Upgrades that it is obligated to construct \npursuant to this TO Tariff and Section 24 of the ISO Tariff. The \nParticipating TO’s obligation to build will be subject to: (1) its ability, \nafter making a good faith effort, to obtain any necessary approvals and \nproperty rights under applicable federal, state, and local laws; (2) the \npresence of a cost recovery mechanism with cost responsibility assigned \nto accordance with the ISO Tariff or applicable FERC precedent; and \n(3) a signed Interconnection Agreement or a signed Expedited \nInterconnection Agreement, or, by mutual agreement of the parties, \nFERC acceptance for filing of an unexecuted Interconnection \nAgreement. \n8.1.5 Energization. The Participating TO shall not be obligated to energize,"},{"page":38,"startToken":14635,"endToken":14927,"text":"nor shall the applicant or wholesale load be entitled to have its \ninterconnection to the ISO Controlled Grid energized, unless and until \nan Interconnection Agreement has been executed, or filed at FERC \npursuant to Section 8.1.3, and become effective and such applicant or \nwholesale load has demonstrated to the ISO’s reasonable satisfaction \nthat it has complied with all of the requirements of the ISO Tariff and \nthe requirements of this TO Tariff. \n \n8.1.6 Coordination with ISO on Interconnection Requests. The \nParticipating TO shall coordinate with the ISO, pursuant to the \nprovisions of the TCA, in developing interconnection standards and \nguidelines for processing interconnection request under this TO \nTariff. \n \n8.2 \nParticipating TO Obligation to Construct Transmission Expansions or \nFacility Upgrades. The Participating TO shall be obligated to: (1) perform \nSystem Impact or Facility Studies where the Project Sponsor or the ISO agrees \nto pay the study cost and specifies the project objectives to be achieved, and (2) \nbuild transmission additions and facility upgrades where the Participating TO is \nobligated to construct or expand facilities in accordance with and subject to the \nlimitations under Section 24 of the ISO Tariff’ and this TO Tariff. \n \n8.2.1 Obligation to Construct. A Participating TO shall not be obligated to \nconstruct or expand transmission facilities or system upgrades unless \nand until the conditions stated in Section 9.2.1 hereof have been \nsatisfied. \n \n8.3 \nRequest for FERC Deference Regarding Need Determination. It is intended \nthat FERC grant substantial deference to the factual determinations of the ISO, \n(including the ISO’s ADR Procedures), the CPUC, WECC, or RTG coordinated \nplanning processes as to the need for or construction of a facility, the need for \nfull cost recovery, end the allocation of costs."},{"page":39,"startToken":14927,"endToken":15353,"text":"9. \nParticipating TO Process for Construction or Expansion of Transmission \nFacilities. Unless DesertLink is the lead Participating TO with respect to a \nrequired system expansion, the provisions of Section 9 of this TO Tariff, and its \nsubparts, shall have no application to the Project or any other High Voltage \nTransmission Facilities, Low Voltage Transmission Facilities, or Entitlements \nturned over to the ISO’s operational control by DesertLink and the corresponding \nprovisions of the lead Participating TO’s TO Tariff shall govern. \n \n9.1 \nApplicability and Determination of Facilities. A Participating TO shall \nperform a Facilities Study in accordance with the Section where (1) the \nParticipating TO is obligated to construct or expand facilities in accordance \nwith Section 24 of the ISO Tariff and this TO Tariff (other than if the obligation \nto expand or construct is pursuant to Section 10 or 10A of this TO Tariff or the \nISO’s generator interconnection procedures); (2) a Market Participant agrees to \npay the costs of the Facilities Study and specifies the project objectives to be \nachieved in terms of increase capacity or reduce congestion; or (3) the \nParticipating TO is required to perform a Facilities Study pursuant to the ISO Tariff. \n \n9.1.1 Payment of Facilities Study’s Cost. \n9.1.1.1 Market Participant to Pay for Facilities Study. Where a \nMarket Participant requests a Facilities Study and the need for \nthe transmission addition or upgrade has not been established in \naccordance with the procedures established herein and the ISO \nTariff, the Market Participant shall pay the cost of the Facilities \nStudy. \n \n9.1.1.2 Project Sponsor or Project Proponent to Pay for Facility \nStudy. Where the facilities to be added or upgraded have been \ndetermined to be needed in accordance with the procedures \nestablished herein, the Project Sponsor, Project Proponent, or the \nISO requesting the study shall pay in advance the reasonable \ncost of the Facilities Study. When the Participating TO is the \nProject Sponsor in accordance with the ISO Tariff, the costs of \nthe Facilities Study shall be recovered through its Access \nCharges and transmission rates. \n \n9.1.1.3 Principal Beneficiaries to Pay for Facilities Study. Where the \nfacilities to be added or upgraded have been determined to be \nneeded and the principal beneficiaries have been identified by the \nISO or ISO ADR Procedures in accordance with the ISO Tariff \nthe Project Sponsor and the identified principal beneficiaries \nshall pay the reasonable cost of the Facilities Study, in such \nproportions as may be agreed, or, failing agreement, as \ndetermined in accordance with the ISO ADR Procedures."},{"page":40,"startToken":15353,"endToken":15824,"text":"9.1.2 Payment Procedure. Where a Facilities Study is being conducted \npursuant to this Section 9, the Participating TO shall, within thirty days of \nthe receipt of all reasonably required information, tender to the Market \nParticipant, Project Sponsor, Project Proponent, ISO, or identified \nprincipal beneficiaries, as the case may be, a Facilities Study Agreement \nthat defines the scope, content, assumptions, and terms of reference for \nsuch study, the estimated time required to complete it, and such other \nprovisions as the parties may reasonably require and pursuant to which \nsuch Market Participant, Project Sponsor, Project Proponent, the ISO, or \nidentified principal beneficiaries agree to reimburse the Participating TO \nthe reasonable cost of performing the required Facilities Study. If the \nMarket Participant, Project Sponsor, Project Proponent, the ISO, or \nidentified principal beneficiaries, as the case may be, agree to the terms of \nthe Facilities Study Agreement, they shall execute the Facilities Study \nAgreement and return it to the Participating TO within ten Business Days. \nAlternatively, if the Market Participant, Project Sponsor, Project \nProponent, the ISO, or identified principal beneficiaries, as the case may \nbe, request the Participating TO to proceed with the Facilities Study and \ncommit to abide by the terms, conditions, and cost assignments ultimately \ndetermined under the ISO ADR Procedures, including any determination \nby FERC or appeal of a FERC determination in accordance with that \nprocess, the Participating TO shall promptly proceed with the Facilities \nStudy, and the parties shall submit the disputed terms for resolution under \nthe ISO’s ADR Procedures. \n9.1.3 Facilities Study Procedures. Upon receipt of an executed Facilities Study \nAgreement or alternative request to proceed as provided for in Section \n9.1.2, a copy of which has been provided to the ISO by the party \nrequesting the Facilities Study, the Participating TO will use due diligence \nto complete the required Facilities Study within a sixty (60) day period. If \nthe Participating TO is unable to complete the Facilities Study in the \nallotted time period, the Participating TO shall notify the Market \nParticipant and provide an estimate of the time needed to reach a final \ndetermination along with an explanation of the reasons that additional time \nis required to complete the study. If additional time is required, the \nParticipating TO will use best efforts to complete the study within 10 \nmonths, provided adequate information is provided by all the parties. \n \n9.2 \nObligation to Build. \n9.2.1 Due Diligence to Construct. Subject to Section 9.3.3 of this TO \nTariff, the Participating TO shall use due diligence to construct, within \na reasonable time, additions or upgrades to its transmission system that \nit is obligated to construct pursuant to the ISO Tariff and this TO \nTariff. Alternatively, if a Market Participant requests the Participating \nTO to file an unexecuted Participation Agreement and commits to"},{"page":41,"startToken":15824,"endToken":16301,"text":"abide by the terms, conditions, and cost assignments determined to be \njust and reasonable under the ISO ADR Procedures, including any \ndetermination by FERC or on appeal of a FERC determination in \naccordance with that process, the Participating TO shall promptly file \nan unexecuted Participation Agreement. \nProvided, however, that if the ISO ADR Procedures concerns whether \nthe requesting entity is an Eligible Customer, the Participating TO shall \nnot be obligated to file an unexecuted Participation Agreement, \ncommence construction of the additions or upgrades or incur other costs \nunder the Participation Agreement until a final order determining the \njust and reasonable rates, terms, and conditions for such Participation \nAgreement has been issued by the applicable court or regulatory \nauthority. The Participating TO’s obligation to build will be subject to: \n1) its ability, after making a good faith effort, to obtain the necessary \napprovals and property rights under applicable federal, state, and local \nlaws; 2) the presence of a cost recovery mechanism with cost \nresponsibility assigned in accordance with the ISO Tariff or this TO \nTariff; and 3) a signed Participation Agreement. The Participating TO \nwill not construct or expand its existing or planned transmission system, \nif doing so would impair system reliability as determined through \nsystems analysis based on the Applicable Reliability Criteria. \n9.2.2 \nDelay in Construction or Expansion. If any event occurs \nthat will materially affect the time for completion of new facilities, or \nthe ability to complete them, the Participating TO shall promptly notify: \n(1) the Project Sponsor with regard to facilities determined to be needed; \n(2) the Parties to the Participation Agreement with regard to facilities \ndetermined to be needed pursuant to the ISO Tariff where principal \nbeneficiaries were identified; and (3) the ISO. In such circumstances, the \nParticipating TO shall, within thirty days of notifying such Project \nSponsor, Parties to the Participation Agreement, and the ISO of such \ndelays, convene a technical meeting with such Project Sponsor, Parties \nto the Participation Agreement, and the ISO to discuss the circumstances \nwhich have arisen and evaluate any options available. The Participating \nTO also shall make available to such Project Sponsor, Parties to the \nParticipation Agreement, and the ISO, as the case may be, studies and \nwork papers related to the cause and extent of the delay and the \nParticipating TO’s ability to complete the new facilities, including all \ninformation that is in the possession of the ParticipatingTO that is \nreasonably needed to evaluate the alternatives. \n \n9.2.2.1 Alternatives to the Original Facility Additions. If the review process \nof Section 9.2.2 determines that one or more alternatives exist to the \noriginally planned construction project, the Participating TO shall \npresent such alternatives for consideration to the Project Sponsor, \nParties to the Participation Agreement, and the ISO, as the case may \nbe. If upon review of any alternatives, such Project Sponsor, the ISO,"},{"page":42,"startToken":16301,"endToken":16743,"text":"or Parties to the Participation Agreement wish to evaluate or to proceed \nwith one of the alternative additions or upgrades, such Project Sponsor, \nthe ISO, or Parties to the Participation Agreement may request that the \nParticipating TO prepare a revised Facility Study pursuant to Sections \n9.1.1, 9.1.2, and 9.1.3 of this TO Tariff. In the event the Participating \nTO concludes that no reasonable alternative exists to the originally \nplanned addition or upgrade and the Project Sponsor or Parties to the \nParticipation Agreement or the ISO disagree, the dispute shall be \nresolved pursuant to the ISO ADR Procedure. \n \n9.2.2.2 Refund Obligation for Unfinished Facility Additions. If the \nParticipating TO and the Project Sponsor, the ISO, or Parties to the \nParticipation Agreement, as the case may be, mutually agree that no \nother reasonable alternatives exist, the obligation to construct the \nrequested additions or upgrades shall terminate and any deposit not yet \napplied toward the expended project costs shall be returned with interest \npursuant to FERC Regulation 35.19a(a)(2)(iii). However, the Project \nSponsor and any identified principal beneficiaries, as the case may be, \nshall be responsible for all costs prudently incurred by the Participating \nTO through the time the construction was suspended. \n \n9.3 \nProvisions Relating To Transmission Construction On the System \nOf Other TOs. \n9.3.1 Responsibility for Third Party Additions. A Participating TO \nshall not be responsible for making arrangements for any \nengineering, permitting, and construction of transmission or \ndistribution facilities on the system(s) of any other entity or for \nobtaining any regulatory approval for such facilities. The \nParticipating TO will undertake reasonable efforts through the \ncoordinated planning process to assist in making such arrangements, \nincluding, without limitation, providing any information or data \nrequired by such other electric system pursuant to Good Utility \nPractice. \n9.3.2 Coordination of Third-Party System Additions. Where transmission \nadditions or upgrades being built pursuant to the ISO Tariff require \nadditions or upgradeson other systems, to the extent consistent with \nSection 9.3.3 of this TO Tariff, the Participating TO shall coordinate \nconstruction on its own system with the construction required by others. \nThe Participating TO, after consultation with the ISO, the Project \nSponsor, and Parties to the Participation Agreement, as the case may be, \nmay defer construction if the new transmission facilities on another \nsystem cannot be completed in a timely manner. The Participating TO \nshall notify such Project Sponsor, Parties to the Participation Agreement, \nand the ISO, in writing of the basis for any decision to defer construction \nand the specific problems which must be resolved before it will initiate or"},{"page":43,"startToken":16743,"endToken":16793,"text":"resume construction of the new facilities. Within forty Business Days of \nreceiving written notification by the Participating TO of its intent to defer \nconstruction pursuant to this section, such Project Sponsor, Parties to the \nParticipation Agreement, or the ISO may challenge the decision in \naccordance with the ISO ADR Procedure."},{"page":44,"startToken":16793,"endToken":17215,"text":"10. \nTSWL Interconnection Process. All requests for TSWL Interconnection with \nthe Project or any other High Voltage Transmission Facilities, Low Voltage \nTransmission Facilities, or Entitlements turned over to the ISO’s operational control by \nDesertLink shall be directed to the Participating TO. \n \n10.1 \nApplicability. All requests for TSWL Interconnection directly to the ISO \nControlled Grid from parties eligible to request such Interconnection consistent \nwith Section 210(a) of the FPA shall be processed pursuant to the provisions of \nthis Section 10. All requests for Interconnection of wholesale generation directly \nto the ISO Controlled Grid shall be processed pursuant to the provisions of the \nISO Tariff. Requests for interconnection submitted by an ECLL on behalf of \nLarge Load Customers shall be processed pursuant to Section 10A of this TO \nTariff. \n \n10.2 \nTSWL Interconnection Applications. An applicant requesting TSWL \nInterconnection shall submit a written TSWL Interconnection Application \nwhich provides the information detailed below to the Participating TO. The \nParticipating TO shall timestamp the application to establish study priority.  \n \n \n(i) the identity, address, telephone number, and email of the applicant \nrequesting TSWL Interconnection;  \n \n \n(ii) the Interconnection point(s) to the ISO Controlled Grid contemplated by \nthe applicant;  \n \n \n(iii) the resultant (or new) maximum amount of TSWL Interconnection \ncapacity contemplated by the applicant;  \n \n \n(iv) the proposed date for energizing the TSWL Interconnection and the \nterm of the interconnection service, and  \n \n \n(v) such other information as the Participating TO reasonably required to \nprocess the application.  \n \n \nIn addition to the information specified above, the following information may \nalso be provided in order to properly evaluate system conditions:  \n \n \n \n(vi) If the applicant is a wholesale load, the electrical location of the source of \nthe power (if known) to be transmitted pursuant to applicant’s request for \nInterconnection. If the source of the power is not known, a system purchase \nwill be assumed. If the location of the load is not known, a system sale will be \nassumed; and, in addition, if an applicant proposes to perform or cause a third \nparty to perform any required System Impact Study or any required Facilities \nStudy, it shall so indicate in its Interconnection Application.  \n \n \nThe results of any study or studies performed by an applicant must be approved \nby both the ISO and the Participating TO. Within ten (10) Business Days after \nreceipt of a TSWL Interconnection Application, the Participating TO and the ISO \nif applicable shall determine whether the application is complete (“Completed \nTSWL Interconnection Application”). Whenever possible, the participating TO \nwill attempt to remedy deficiencies in the TSWL Interconnection Application"},{"page":45,"startToken":17215,"endToken":17674,"text":"through informal communications with the applicant. If such efforts are \nunsuccessful, the Participating TO shall return the Interconnection Application to \nthe applicant.  \nThe Participating TO will treat the information in the TSWL Interconnection \nApplication, including the applicant’s identity, as confidential at the request of the \napplicant except to the extent that disclosure of the information is required by this \nTO Tariff, by regulatory or judicial order, for reliability purposes pursuant to \nGood Utility Practice, or pursuant to RTG or ISO transmission information \nsharing agreements. The Participating TO shall treat this information consistent \nwith the standards of conduct contained in Part 37 of FERC’s regulations. \n10.2.1 Amendment to Completed TSWL Interconnection Application. An \napplicant shall only be limited to amending its Completed TSWL \nInterconnection Application once. Such amendment shall occur on or \nbefore ten (10) Business Days following the date the Participating TO \ntenders any Facilities Study Agreement. Specifically, an applicant may \nsubmit an amendment to its Completed TSWL Interconnection \nApplication to reflect a revised configuration for its New Facility. The \namended Completed TSWL Interconnection Application shall be treated \nin accordance with Section 25 of the ISO Tariff and Section 10.5 of this \nTO Tariff; the applicant’s Completed TSWL Interconnection Application \nshall be deemed withdrawn; and the applicant shall maintain its existing \nqueue position, if (a) the amended Completed TSWL Interconnection \nApplication is received by the Participating TO within ten (10) Business \nDays of the Participating TO’s tender of a Facilities Study Agreement; \nand (b) the applicant has not submitted a previous amendment to the \nCompleted TSWL Interconnection Application. In the event an applicant \namends its Completed TSWL Interconnection Application, it will be \nresponsible for any additional study costs that result from that \namendment, including costs associated with revisions to studies for other \napplicants holding later queue positions. \n \n10.3 \nReview of Completed TSWL Interconnection Application. After receiving a \nCompleted TSWL Interconnection Application, the Participating TO and the \nISO, if applicable, will determine on a non-discriminatory basis whether a \nSystem Impact Study is required. Whenever the Participating TO, and the ISO, if \napplicable, determines that a System impact Study is not required and that neither \nReliability Upgrades nor changes in existing operating procedures are required, \nthe Participating TO shall notify the applicant within fifteen (15) Business Days \nof the Completed Application Date. If the TSWL Interconnection can be \naccommodated without any Direct Assignment Facilities, then within thirty (30) \nBusiness Days of such notice from the Participating TO, the applicant shall \nrequest the Participating TO to tender to the applicant an Interconnection \nAgreement within thirty (30) Business Days of such request. The Participating \nTO shall tender to the applicant an Interconnection Agreement as provided in this \nSection 10. If the Participating TO determines upon review of the Completed"},{"page":46,"startToken":17674,"endToken":18168,"text":"TSWL Interconnection Application, that Direct Assignment Facilities are \nrequired, the Participating TO shall tender to the applicant a Facilities Study \nAgreement within twenty (20) Business Days of the Completed Application Date \nand continue the Interconnection process pursuant to Section 10.8. \n \n10.4 Notice of Need for System Impact Study. If the Participating TO, and the ISO, \nif applicable, determines that a System Impact Study is necessary to \naccommodate the requested Interconnection, the Participating TO shall so \ninform the applicant as soon as practicable. In such cases, the Participating TO \nshall within twenty (20) Business Days of receipt of a Completed TSWL \nInterconnection Application, tender a System Impact Study Agreement that \ndefines the scope, content, assumptions and terms of reference for such study to \nbe completed by the Participating TO, the estimated time required to complete it, \nand such other provisions as the parties may reasonably require, and pursuant to \nwhich the applicant shall agree to reimburse the Participating TO for the \nreasonable actual costs of performing the required System Impact Study. A \ndescription of the Participating TO’s transmission assessment practices for \ncompleting a System Impact Study shall be provided in the Participating TO’s \nFERC Form 715. \nAlternatively, if the applicant will perform the System Impact Study, the \nParticipating TO shall within twenty (20) Business Days of receipt of a \nCompleted TSWL Interconnection Application, tender a System Impact Study \nAgreement that defines the scope, content, assumptions and terms of reference \nfor such study to be reviewed by the Participating TO; the estimated time \nrequired to complete it; and such other provisions as the parties may reasonably \nrequire, and pursuant to which the applicant shall agree to reimburse the \nParticipating TO for the reasonable actual costs of reviewing the required \nSystem Impact Study.  \nFor a TSWL Interconnection request to remain a Completed TSWL \nInterconnection Application, the applicant shall execute the System Impact \nStudy Agreement and return it to the Participating TO within ten (10) Business \nDays together with payment for the reasonable estimated cost of performing the \nSystem Impact Study or reviewing the applicant’s System Impact Study. \nAlternatively, if the applicant request the Participating TO to proceed with the \nSystem Impact Study or review thereof and commits to abide by the terms, \nconditions, and cost assignments ultimately determined under the ISO ADR \nProcedures, including any determination by FERC or appeal of a FERC \ndetermination in accordance with that process, the Participating TO shall \npromptly proceed with the System Impact Study provided that such request is \naccompanied by payment of the reasonable estimated cost of the System Impact \nStudy, and the parties shall submit the disputed terms for resolution under the \nISO’s ADR Procedures. If the applicant elects not to execute a System Impact \nStudy Agreement, and does not request that the Participating TO proceed with \nthe System Impact Study or review thereof, its application shall be deemed \nwithdrawn, and the applicant shall reimburse to the Participating TO all costs \nreasonably incurred in processing the application."},{"page":47,"startToken":18168,"endToken":18631,"text":"10.5 \nSystem Impact Study Cost Reimbursement and Agreement. \n10.5.1 Cost Reimbursement. The System Impact Study Agreement shall \nclearly specify the charge, based on the Participating TO’s estimate of \nthe cost and time for completion of the System Impact Study. The \ncharge shall not exceed the reasonable actual cost of the study. In \nperforming the System Impact Study, the Participating TO shall rely, \nto the extent reasonably practicable, on existing transmission planning \nstudies. The applicant will not be assessed a charge for such existing \nstudies; however, the applicant will be responsible for the reasonable \ncharges associated with any modifications to existing planning studies \nthat are reasonably necessary to evaluate the impact on the applicant’s \nrequest. \n \n10.6 \nSystem Impact Study Procedures. Upon receipt of an executed System \nImpact Study Agreement or initiation of the ISO ADR Procedures and receipt \nof payment for estimated study costs, the Participating TO will use due \ndiligence to either (a) complete the required System Impact Study within a \nsixty (60) calendar day period or (b) complete its review of an applicant’s \nSystem Impact Study within thirty (30) calendar days of its receipt of the \ncompleted study. The System Impact Study will identify whether any Direct \nAssignment Facilities or Reliability Upgrades are necessary to deliver a New \nFacility’s full output over the ISO Controlled Grid, or any transmission \nadditions or upgrades are necessary to serve a wholesale load. The System \nImpact Study will also identify any adverse impact on Encumbrances existing \nas of the applicant’s Completed Application Date. In the event that the \nParticipating TO is unable to complete the required System Impact Study \nwithin such time period, it shall so notify the applicant, in writing, and provide \nan estimated completion date along with an explanation of the reasons why \nadditional time is required to complete the required studies. A copy of the \ncompleted System Impact Study and related work papers shall be made \navailable to the applicant and the ISO. The Participating TO shall notify the \napplicant and the ISO immediately upon completion of the System Impact \nStudy. \n \n10.6.1 Procedures Upon Completion of System Impact Study. Within fifteen \n(15) Business Days of completion of the System Impact Study or review \nand approval of an applicant’s System Impact Study, the Participating \nTO shall notify the applicant whether the transmission system will be \nadequate to accommodate all of a request for Interconnection. If no costs \nare likely to be incurred for any Direct Assignment Facilities, any \nReliability Upgrades, or implementing any operating procedures, then \nwithin thirty (30) Business Days of receipt of written approval of the \napplicant’s System Impact Study from the Participating TO and the ISO \nthe applicant shall request the Participating TO to tender an \nInterconnection Agreement within thirty (30) Business Days of such"},{"page":48,"startToken":18631,"endToken":19134,"text":"request. The Participating TO shall tender to the applicant an \nInterconnection Agreement as provided in Section 10.9. If costs are likely \nto be incurred to accommodate a request for Interconnection, the \nParticipating TO shall tender to the applicant a Facilities Study \nAgreement pursuant to Section 10.8. \n \n10.7 \nNotice of Need for Facilities Study. If a System Impact Study indicates that \nadditions or upgrades to the ISO Controlled Grid are needed to satisfy an \napplicant’s request for interconnection, the Participating TO shall, within fifteen \n(15) Business Days of the date of the System Impact Study or the completion of \nreview and approval of the applicant’s System Impact Study by the Participating \nTO, tender to the applicant a Facilities Study Agreement that defines the scope, \ncontent, assumptions and terms of reference for such study to be completed by \nthe Participating TO; the estimated time required to complete the required study; \nand such other provisions as the parties may reasonably require, and pursuant to \nwhich the applicant agrees to reimburse the Participating TO for the reasonable \nactual costs of performing the required Facilities Study. Alternatively, if the \napplicant will perform the Facilities Study, the Participating TO shall within \nfifteen (15) Business Days of the completion date of the System Impact Study or \nthe completion of review and approval of the applicant’s System Impact Study, \ntender a Facilities Study Agreement that defines the scope, content, assumptions \nand terms of reference for such study to be reviewed by the Participating TO; the \nestimated time required to complete the required review; and such other \nprovisions as the parties may reasonably require, and pursuant to which the \napplicant agrees to reimburse the Participating TO for the reasonable actual costs \nof reviewing the required Facilities study. For an Interconnection request to \nremain a Completed TSWL Interconnection Application, the applicant shall \nexecute the Facilities Study Agreement and return it to the Participating TO \nwithin ten (10) Business Days together with payment for the reasonable \nestimated costs of performing the Facilities Study or reviewing the applicant’s \nFacilities Study. Alternatively, if the applicant request the Participating TO to \nproceed with the Facilities Study or review thereof and commits to abide by \nterms, conditions, and cost assignments ultimately determined under the ISO \nADR Procedures, including any determination by FERC or appeal of a FERC \ndetermination in accordance with that process, the Participating TO shall \npromptly proceed with the Facilities Study provided that such request is \naccompanied by payment for the reasonable estimated cost of the Facilities \nStudy, and the parties shall submit the disputed terms for resolution under the \nISO ADR Procedures. If the applicant elects not to execute a Facilities Study \nAgreement and does not request that the Participating TO proceed with the \nFacilities Study or review thereof, its application shall be deemed withdrawn and \nthe applicant shall reimburse to the Participating TO all costs reasonably incurred \nin processing the application not covered by the System Impact Study \nAgreement. \n \n10.8 \nFacilities Study Procedures. Upon receipt of an executed Facilities Study"},{"page":49,"startToken":19134,"endToken":19621,"text":"Agreement or initiation of the ISO ADR Procedures and receipt of payment for \nthe estimated study costs, the Participating TO will use due diligence to either \n(a) complete the required Facilities Study within a sixty (60) calendar day \nperiod or (b) complete its review of an applicant’s Facilities Study within thirty \n(30) calendar days of its receipt of the Completed Study. In the event that \nParticipating TO is unable to complete the required Facilities Study within such \ntime period, it shall so notify the applicant, in writing, and provide an estimated \ncompletion date along with an explanation of the reasons why additional time \nis required to complete the required studies. A copy of the completed Facilities \nStudy shall be made available to the applicant. \n \n10.8.1 Tender of Interconnection Agreement. Within thirty (30) Business \nDays of receipt of the completed Facilities Study performed by the \nParticipating TO or receipt of written approval of the applicant’s \nFacilities Study from the Participating TO, the applicant shall request the \nParticipating TO to tender an Interconnection Agreement within thirty \n(30) Business Days of such request. The Participating TO shall tender to \nthe applicant an Interconnection Agreement as provided in Section 10.9. \n \n10.9 \nInterconnection Agreement.  \nPursuant to Section 10.3, 10.6.1, or 10.8.1, a \nparty requesting Interconnection shall request in writing that the Participating \nTO tender to such party an Interconnection Agreement that will be filed with \nFERC, or the Local Regulatory Authority, in the case of a Local Publicly \nOwned Electric Utility. The Interconnection Agreement shall include, without \nlimitation, cost responsibilities and payment provisions for any engineering, \nequipment, construction, ownership, operation and maintenance costs for any \nDirect Assignment Facilities, any Reliability Upgrades, and for any other \nmitigation measures. The Interconnection Agreement will set forth a payment \nschedule that enables the Participating TO to recover its costs. \n \n \nFor a TSWL Interconnection request to remain a Completed TSWL \nInterconnection Application, the applicant requesting the Interconnection or the \nentity with whom the Participating TO will interconnect for the Interconnection \nshall execute the Interconnection Agreement and return it to the Participating \nTO within thirty (30) Business Days of receipt. Alternatively, if an applicant \nrequesting the TSWL Interconnection or the entity with whom the Participating \nTO will interconnect for the Interconnection requests the Participating TO to file \nan unexecuted Interconnection Agreement and commits to abide by the terms, \nconditions, and cost assignments determined to be just and reasonable under the \nISO ADR Procedures, including any determination by FERC or on appeal of a \nFERC determination in accordance with that process, the Participating TO shall \npromptly file an unexecuted Interconnection Agreement. Provided, however, \nthat if the ISO ADR Procedures concerns whether the requesting entity is a \neligible for a TSWL Interconnection, the Participating TO shall not be obligated \nto file an unexecuted Interconnection Agreement or commence construction of \nany facilities or incur other costs under the Interconnection Agreement until a"},{"page":50,"startToken":19621,"endToken":20095,"text":"final order determining the just and reasonable rates, terms, and conditions for \nsuch Interconnection Agreement has been issued by the applicable court or \nregulatory authority. If the applicant or the entity with whom the Participating \nTO will interconnect for the Interconnection elects not to execute the \nInterconnection Agreement and does not request the Participating TO to file an \nunexecuted Interconnection Agreement, its Completed TSWL Interconnection \nApplication shall be deemed withdrawn, and the applicant shall reimburse to the \nParticipating TO all costs reasonably incurred in processing the application not \ncovered by any System Impact Study Agreement or Facilities Study Agreement.  \n \n \nWhere a TSWL Interconnection will serve one or more Large Loads, as a \ncondition to the Participating TO’s design, procurement, construction, or \noperation of any Large Load-Driven Upgrades (as defined in the pro forma \nLarge Load Cost Recovery Agreement set forth in Appendix V) associated with \nthe TSWL Interconnection, the applicant or Eligible Customer shall also, within \nthe same period and subject to the same consequences as the Interconnection \nAgreement, execute and maintain a Cost Recovery Agreement substantially in \nthe form set forth in Appendix V to this TO Tariff, or, if the applicant or \nEligible Customer requests that the Cost Recovery Agreement be filed \nunexecuted with FERC, comply with that agreement as made effective by \nFERC, in each case as applicable to the requested TSWL Interconnection. \nDisputes arising under a Cost Recovery Agreement shall be resolved under the \ndispute resolution provisions of that agreement. \n \n10.10 Partial Interim Service. If the Participating TO determines that there will not \nbe adequate transmission capability to satisfy the full amount requested in a \nCompleted TSWL Interconnection Application, the Participating TO nonetheless \nshall be obligated to offer and provide the portion of the requested TSWL \nInterconnection that can be accommodated without any additional Direct \nAssignments Facilities or Reliability Upgrades. However, the Participating TO \nshall not be obligated to provide the incremental amount of requested TSWL \nInterconnection that requires such additional facilities or upgrades until such \nfacilities or upgrades have been placed in service. \n \n10.11 Expedited Interconnection Procedures. In lieu of the procedures set forth \nabove, the applicant shall have the option to expedite the processing of its \nCompleted TSWL Interconnection Application. In order to exercise this option, \nthe applicant shall submit in writing a Request for Expedited Interconnection \nProcedures to the Participating TO within ten (10) Business Days after receiving \na copy of the System Impact Study for the proposed TSWL Interconnection. \nWithin ten (10) Business Days after receiving a Request for Expedited \nProcedures, the Participating TO shall tender an Expedited Interconnection \nAgreement that requires the applicant to compensate the Participating TO for all \ncosts reasonably incurred pursuant to the terms of this TO Tariff for processing \nthe Completed TSWL Interconnection Application and providing the requested \nInterconnection. While the Participating TO agrees to provide the applicant with"},{"page":51,"startToken":20095,"endToken":20230,"text":"its best estimate of the costs of any needed Direct Assignment Facilities and, if \napplicable, Reliability Upgrades, and such other charges that may be incurred, \nunless otherwise agreed by the parties, such estimate shall not be binding and the \napplicant must agree in writing to compensate the Participating TO for all actual \nTSWL Interconnection costs reasonably incurred pursuant to the provisions of \nthis TO Tariff. The applicant shall execute and return such Expedited \nInterconnection Agreement within ten (10) Business Days of its receipt or the \napplicant’s request for Interconnection will cease to be a Completed TSWL \nInterconnection Application and will be deemed terminated and withdrawn. In \nthat event, the applicant shall reimburse the Participating TO for all costs \nreasonably incurred in processing the application not covered by the terms of the \nSystem Impact Study Agreement."},{"page":52,"startToken":20230,"endToken":20615,"text":"10A. Interconnection Process for ECLL Interconnections. All requests for ECLL \nInterconnection shall be directed to the Participating TO. \n \n10A.1 \nApplicability. An ECLL Interconnection must be requested in order to \nconnect the facilities of the Participating TO to the facilities of an ECLL \nthat has received a request to connect and provide retail transmission \nservice to a Large Load Customer. \n \n10A.2 ECLL Application and Application Fee \n \n10A.2.1 \nApplication Contents. An ECLL requesting an ECLL Interconnection \nshall submit an ECLL Interconnection Application in the form of \nAttachment 1 to Appendix VI, which provides the following required \ninformation, and shall send a copy of the application to the ISO. The \nECLL Interconnection Application and all supporting documentation shall \nbe submitted electronically to the Participating TO in the manner posted \non the Participating TO’s public website. \n \n(a) \nthe identity, address, telephone number, and email of the ECLL; \n(b) \nthe Point of Withdrawal; \n(c) \na proposed Large Load Customer load ramp schedule identifying \nanticipated load additions over time and the Large Load Customer’s \nmaximum load; \n(d) \na site plan; \n(e) \ndocumentation demonstrating that the Large Load Customer has Site \nControl; \n(f) \ndocumentation demonstrating that the Large Load Customer has local \npermits and regulatory approvals for development of its Large Load; \n(g) \na single-line electrical diagram; \n(h) \nthe electrical location of the source of the power (if known) to be \ntransmitted pursuant to the ECLL’s request for ECLL Interconnection. If \nthe source of the power is not known, a system purchase will be assumed; \n(i) \ndisclosure of ECLL interconnection requests in the ECLL’s footprint that \nare for the same Large Load Customer or any of its affiliate(s); \n(j) \na completed technical data form in the form of Appendix A to Attachment \n1 to Appendix VI; \n(k) \nif the Large Load Customer will be a Co-Located Large Load, information \nconcerning the relevant Generating Facility must be provided by the \nECLL. Such information may be either: (1) if the Generating Facility has \nnot signed a generator interconnection agreement, the identifying queue \nnumber of the Generating Facility; or (2) if the Generating Facility has \nsigned a generator interconnection agreement, information that will allow \nthe Participating TO to identify such agreement; and \n(l) \nthe proposed date for energizing the ECLL Interconnection and the \nproposed term of the ECLL Interconnection service."},{"page":53,"startToken":20615,"endToken":21025,"text":"10A.2.2 \nParticipating TO Review of ECLL Interconnection Application. \nWithin ten (10) Business Days after receipt of an ECLL Interconnection \nApplication, the Participating TO shall determine whether the application \nis complete (“Completed ECLL Interconnection Application”). Wherever \npossible, the Participating TO will attempt to remedy deficiencies in the \nECLL Interconnection Application through informal communications with \nthe ECLL. If such efforts are unsuccessful, the Participating TO shall \nreturn the ECLL Interconnection Application to the ECLL. \n \nThe Participating TO will treat the information provided in the ECLL Interconnection \nApplication, including the ECLL’s and Large Load Customer’s identity, as \nconfidential at the request of the ECLL except to the extent that disclosure of this \ninformation is required by this TO Tariff or the ISO Tariff, by regulatory or judicial \norder, for reliability purposes pursuant to Good Utility Practice, or pursuant to RTG \nor ISO transmission information sharing agreements. The Participating TO shall treat \nthis information consistent with the standards of conduct contained in Part 37 of \nFERC’s regulations. \n \n10A.3 Study Process and ECLL Interconnection Agreement. ECLL Interconnection \nApplications shall be processed, and ECLL Interconnection Agreements shall be \ntendered, executed, and filed, in accordance with the Large Load Interconnection \nProcedures set forth in Appendix VI. Disputes arising under a Cost Recovery \nAgreement shall be resolved under the dispute resolution provisions of that \nagreement. \n \n10A.4 Interim Service \n \n10A.4.1 \nInterim Firm Interconnection Service and Flexible Interim Load \nInterconnection (FILI) Service. If the ECLL has requested Interim Firm \nInterconnection Service and/or FILI Service, the Participating TO shall \nperform an analysis and report the extent to which the requested interim \nservices can be provided, prior to such time that all ECLL Interconnection \nFacilities are in service and the Large Load Customer is authorized to \nwithdraw Energy. However, the Participating TO shall not be obligated to \nprovide any amount of Firm Interconnection Service requested until \nnecessary facilities have been placed in service. FILI Service will be \navailable for all remaining Load that cannot receive Interim Firm \nInterconnection Service, if the Large Load Customer has the ability to \nreduce the load at a specified point of interconnection according to the \ntimelines and protocols set forth in an executed and effective FILI Service \nAgreement, until the ECLL Interconnection Facilities are in service. As \nECLL Interconnection Facilities are placed into service and transmission \ninterconnection capability is increased, available quantities of Firm \nInterconnection Service and FILI Service will be updated and reflected in \nthe applicable FILI Service Agreement."},{"page":54,"startToken":21025,"endToken":21447,"text":"If the Large Load Customer seeks FILI Service, the ECLL will ensure that \nthe Large Load Customer signs a FILI Service Agreement developed by \nthe Participating TO, or asks for the agreement to be filed unexecuted. \n \n10A.4.2 \nStudy Process for Interim Service and Determination of Availability \nof Interim Firm Interconnection Service and FILI Service. The \nParticipating TO shall perform a FILI Study in accordance with Section \n4.6.2 of Appendix VI to determine the maximum amount of any Interim \nFirm Interconnection Service, if any, and FILI Service, if any, that may be \nprovided based on the anticipated availability of transmission capacity \nonce the Large Load Customer is permitted to withdraw energy by the \nECLL. The Participating TO shall update this analysis under the terms of \nthe FILI Service Agreement, at least annually. \n \nThe actual amount of any FILI Service to be provided during any \noperating period shall be determined by the Participating TO through \noperational assessments and analysis conducted closer to real-time \noperating conditions. Accordingly, the maximum FILI Service established \nin the annual analysis does not guarantee the availability of such service \nunder actual system conditions. \n \n10A.4.3 \nConditions Related to FILI Service \n \n10A.4.3.1 FILI Service Reliability Requirements. The FILI Service \nAgreement will identify what ECLL Interconnection Facilities must be \ninstalled, the necessary protection and control systems and any other \nequipment necessary to be installed, and operating limitations to allow the \nLarge Load Customer to withdraw energy (“FILI Service Reliability \nRequirements”). FILI Service shall not commence until the Participating TO \nand ECLL have completed installation and commissioning of all equipment \nspecified under the FILI Service Agreement. \n \n10A.4.3.2 Curtailment of FILI Service. FILI Service is subject to \ncurtailment at all times, unless the Participating TO’s right to curtail is \nexpressly conditioned or otherwise limited in an executed and effective FILI \nService Agreement. A Large Load Customer receiving FILI Service shall be \nsubject to curtailment prior to any curtailment of customers receiving Firm \nInterconnection Service. The Participating TO and ISO may curtail FILI \nService as necessary to maintain the reliable operation of the ISO Controlled \nGrid, including during normal operating conditions. \n \n10A.4.3.3 Exceedance of Authorized FILI Service. An ECLL shall ensure \nthat the operating instructions issued by the Participating TO pursuant to a \nFILI Service Agreement are not exceeded at the relevant Point of Withdrawal. \nThe Participating TO shall have the right to disconnect service to the Large \nLoad Customer in the event that energy withdrawals violate the terms of the"},{"page":55,"startToken":21447,"endToken":21754,"text":"FILI Service Agreement. The Participating TO shall follow Good Utility \nPractice in carrying out any such disconnection and subsequent reconnection \nwhen the conditions for such reconnection set forth in the FILI Service \nAgreement have been met. Nothing in this TO Tariff prevents the ISO from \napplying any financial penalties applicable to Large Load Customers. \n \n10A.5 Co-Located Large Load. The interconnection processes applicable to a Co-Located \nLarge Load shall be determined based on whether the Generating Facility is a (1) \nnon-exporting Generating Facility interconnected in accordance with the generator \ninterconnection rules of the applicable ECLL, as approved by its Local Regulatory \nAuthority (including, for a UDC subject to the jurisdiction of the CPUC, CPUC \nElectric Rule 21); or (2) an exporting Generating Facility subject to the applicable \nISO generator interconnection procedures and requirements. The ECLL for a Co-\nLocated Large Load connecting to facilities of an exporting Generating Facility will \nbe subject to this Section 10A. \n \nFor a Co-Located Large Load interconnected to the facilities of an exporting \nGenerating Facility, the ISO will be a party to a pro forma agreement that bridges the \npro forma Large Generator Interconnection Agreement (LGIA) with the ECLL \nInterconnection Agreement, or will negotiate a non-conforming LGIA to account for \ncertain details of the Co-Located Large Load interconnection on an individual basis. \nThe Generating Facility developer will also execute an ISO pro forma Participating \nGenerator Agreement for the Generating Facility, but not a Participating Load \nAgreement for the Co-Located Large Load. \n \n10A.6 Large Load Cost Recovery Agreement. As a condition to the Transmission Owner’s \ndesign, procurement, construction, or operation of a Large Load-Driven Upgrade, the \nEligible Customer shall execute and maintain a Large Load Cost Recovery Agreement \nsubstantially in the form set forth in Appendix V to this TO Tariff, as applicable to the \nrequested service and associated Large Load Facility."},{"page":56,"startToken":21754,"endToken":21968,"text":"13. \nCreditworthiness \n13.1 \nUDCs, MSSs, and Scheduling Coordinators Using the Participating TO’s Low Voltage \nTransmission Facilities. For the purpose of determining the ability of a UDC, MSS, and \nScheduling Coordinator to meet its obligations related to using the Participating TO’s Low \nVoltage Transmission Facilities hereunder, where the Participating TO is collecting the Low \nVoltage Access Charge directly from each UDC, MSS and Scheduling Coordinator, the \nParticipating TO may require reasonable credit review procedures for the UDC, MSS, or \nScheduling Coordinator. This review shall be made in accordance with standard commercial \npractices. In addition, the Participating TO may require the UDC, MSS, or Scheduling \nCoordinator to provide and maintain in effect during the term of the service, an unconditional \nand irrevocable letter of credit as security to meet its responsibilities and obligations under \nthis TO Tariff, or an alternative form of security proposed by the UDC, MSS, or Scheduling \nCoordinator and acceptable to the Participating TO, and consistent with commercial practices \nestablished by the Uniform Commercial Code, that protect the Participating TO against the \nrisk of non-payment. \n13.2 \nEnd-Users. Creditworthiness and security rules applicable to End-Users shall be \npursuant to the then-current rules of the applicable Local Regulatory Authority and \nany agreement under this TO Tariff to which the End-User is a party."},{"page":57,"startToken":21968,"endToken":22072,"text":"14. \nDisputes. Except as limited below, as provided in Sections 10.9 and 10A.3, or as \notherwise limited by law, the ISO ADR procedures shall apply to all disputes between parties \nwhich arise under this TO Tariff or under or in respect of the proposed terms and conditions of \na Facilities Study Agreement, System Impact Study Agreement or Expedited Interconnection \nAgreement. The ISO ADR Procedures set forth in Section 13 of the ISO Tariff shall not apply \nto disputes as to whether rates and charges set forth in this TO Tariff (other than charges for \nstudies) are just and reasonable under the FPA."},{"page":58,"startToken":22072,"endToken":22542,"text":"16. \nMiscellaneous. \n16.1 \nNotices. Any notice, demand, or request in accordance with this TO Tariff, \nunless otherwise provided in this TO Tariff, shall be in writing and shall be \ndeemed properly served, given, or made: (i) upon delivery if delivered in \nperson or electronically via email, (ii) five days after deposit in the mail if sent \nby first class United States mail, postage prepaid, (iii) upon receipt of \nconfirmation by return electronic facsimile if sent by facsimile, or (iv) upon \nParty at the address set forth in Appendix II. Any Party may at any time, by \nnotice to the other Parties, change the designation or address of the person \nspecified in Appendix II to receive notice on its behalf. Any notice of a routine \ncharacter in connection with service under this TO Tariff or in connection with \noperation of facilities shall be given in such a manner as the Parties may \ndetermine from time to time, unless otherwise provided in this TO Tariff. \n \n16.2 \nWaiver. Any waiver at any time by any Party of its rights with respect to any \ndefault under this TO Tariff, or with respect to any other matter arising in \nconnection with this TO Tariff, shall not constitute or be deemed a waiver with \nrespect to any subsequent default or other matter arising in connection with this \nTO Tariff. Any delay short of the statutory period of limitations in asserting or \nenforcing any right shall not constitute or be deemed a waiver. \n \n16.3 \nConfidentiality. \n \n16.3.1 Maintaining Confidentiality If Not for Public Disclosure. The \nParticipating TO shall maintain the confidentiality of all of the \ndocuments, data, and information provided to it by any other Market \nParticipant that such Market Participant may designate as confidential, \nprovided, however, that the information will not be held confidential \nby the Participating TO if (1) the Participating TO or Market \nParticipant is required to provide such information for public \ndisclosure pursuant to this TO Tariff or applicable regulatory \nrequirements, or (2) the information becomes available to the public \non a non-confidential basis (other than from the Participating TO). \n \n16.3.2 Disclosure of Confidential Information. Notwithstanding anything in \nthis Section 16.3 to the contrary, if the Participating TO or any Market \nParticipant is required by applicable laws or regulations, or in the course \nof administrative or judicial proceedings, to disclose information that is \notherwise required to be maintained in confidence pursuant to this \nSection 16.3, the Participating TO or Market Participant may disclose \nsuch information; provided, however, that as soon as such Participating \nTO or Market Participant learns of the disclosure requirement and prior \nto making such disclosure, such Participating TO or Market Participant \nshall notify the affected Participating TO or Market Participants of the \nrequirement and the terms thereof. The affected Participating TO or"},{"page":59,"startToken":22542,"endToken":22999,"text":"Market Participants may, at their sole discretion and own costs, direct \nany challenge to or defense against the disclosure requirement and the \ndisclosing Participating TO or Market Participant shall cooperate with \nsuch affected Participating TO or Market Participants to the maximum \nextent practicable to minimize the disclosure of the information \nconsistent with applicable law. The disclosing Participating TO or \nMarket Participant shall cooperate with the affected Participating TO or \nMarket Participants to obtain proprietary or confidential treatment of \nconfidential information by the person to whom such information is \ndisclosed prior to any such disclosure. \n \n16.4 \nTO Tariff Supersedes Existing Tariffs. This TO Tariff, together with the ISO \nTariff and wholesale distribution access tariff if any, supersedes any pre- \nexisting open access transmission tariff of the Participating TO. \n \n16.5 \nTitles. The captions and headings in this TO Tariff are inserted solely to \nfacilitate reference and shall have no bearing upon the interpretation of any \nof the rates, terms, and conditions of this TO Tariff. \n \n16.6 \nSeverability. If any term, covenant, or condition of this TO Tariff or the \napplication or effect of any such term, covenant, or condition is held invalid as \nto any person, entity, or circumstance, or is determined to be unjust, \nunreasonable, unlawful, imprudent, or otherwise not in the public interest, by \nany court or government agency of competent jurisdiction, then such term, \ncovenant, or condition shall remain in force and effect to the maximum extent \npermitted by law, and all other terms, covenants, and conditions of this TO \nTariff and their application shall not be affected thereby but shall remain in \nforce and effect. The Participating TO and Market Participants shall be \nrelieved of their obligations only to the extent necessary to eliminate such \nregulatory or other determination, unless a court or governmental agency of \ncompetent jurisdiction holds that such provisions are not severable from all \nother provisions of this TO Tariff. \n \n16.7 \nPreservation of Obligations. Upon termination of this TO Tariff, all \nunsatisfied obligations of any entity shall be preserved until satisfied. \n \n16.8 \nGoverning Law. This TO Tariff shall be interpreted, governed by, and construed \nunder the laws of the State of California, without regard to the principles of \nconflict of laws thereof, or the laws of the United States, as applicable, as if \nexecuted and to be performed wholly within the State of California. \n \n16.9 \nAppendices Incorporated. The several appendices to this TO Tariff, as may be \nrevised from time to time, are attached to this TO Tariff and are incorporated by \nreference as if fully set forth herein. \n16.10 \nConflict With ISO Tariff. If a Market Participant identifies a conflict between \nthe TO Tariff and the ISO Tariff, the Participating TO and the Market"},{"page":60,"startToken":22999,"endToken":23154,"text":"Participant shall make good-faith efforts to resolve the conflict. If the \nParticipating TO and Market Participant are unable to informally resolve that \nconflict, the Participating TO and Market Participant may use the ISO ADR \nProcedures to resolve it as set forth in Section 14 of this Tariff. \n \n16.11 \nConflicting Operating Instructions. In the event a Market Participant \nreceives conflicting operating instructions from the ISO and one or more \nParticipating TO(s), if human safety would not knowingly be neither \njeopardized nor electric facilities subject to damage while the Market \nParticipant seeks to reconcile the conflict with the appropriate ISO and \nParticipating TO employees before acting, the Market Participant should \nattempt a reconciliation. Otherwise, the Market Participant shall adhere to ISO \nTariff Section 4.2 and follow the ISO’s instructions. In no event shall a Market \nParticipant be required to follow operating instructions from the ISO if \nfollowing those instructions would knowingly jeopardize human safety."},{"page":61,"startToken":23154,"endToken":23284,"text":"Projected ATRR\nFor the 12 months ended\n12/31/__\nFormula Rate Index\nDesertLink, LLC\nTable of Contents\nFormula Rate Template\nAttachments:\nAttachment No\nWorksheet Name\n1\nProject Revenue Requirement Worksheet\n1a\nProject Plant Detail Worksheet\n2\nIncentive Return\n3\nFormula Rate True-Up\n4\nRate Base Worksheet\n5\nReturn on Rate Base Worksheet\n6\nInterest on True-Up\n6A\nTrue-Up Interest Rate Calculator\n7\nWeighted Average Federal and State Income Tax Rates\n8\nCost of Debt Prior to Issuing Non-Construction Financing\n9\nTrue-Up - Construction Financing Cost of Debt\n10\nDepreciation Rates\n11\nPrior Period Adjustments\n12\nRevenue Credit Detail\n13\nExcess or Deficient Accumulated Deferred Income Taxes - Summary\n13.1\nRegulatory Assets/Liabilities for Deficient/Excess ADIT - Averaging and Proration Adjustments \n13.2\nRe-measurement of ADIT and Tax-related Regulatory Assets and Liabilities"},{"page":62,"startToken":23284,"endToken":23438,"text":"Formula Rate - Non-Levelized\nPage 1 of 5\nRate Formula Template\nUtilizing FERC Form 1 Data\nDesertLink, LLC\nProjected ATRR\nFor the 12 months ended\n12/31/__\n(1)\n(2)\n(3)\n(4)\n(5)\nLine\nAllocated \nNo.\nSource\nAmount\n1\nGROSS REVENUE REQUIREMENT, without incentives\n(Page 3, Line 49)\n $                               -   \nREVENUE CREDITS\n(Note A)\nTotal\nAllocator (W)\n2\nAccount No. 454\n(Page 4, Line 20)\n                                                  -   \nTP\n         1.0000 \n $                               -   \n3\nAccount No. 456.1\n(Page 4, Line 21)\n                                                  -   \nTP\n         1.0000 \n $                               -   \n4\nRevenues from Grandfathered Interzonal Transactions\n(Note B)\n                                                  -   \nTP\n         1.0000 \n $                               -   \n5\nRevenues from service provided by the ISO at a discount\n                                                  -   \nTP\n         1.0000 \n $                               -   \n6\nTOTAL REVENUE CREDITS\n(Sum of Lines 2 through 5)\n                                                  -   \n $                               -   \n7\nPrior Period Adjustments\nAttachment 11, Line 18, Col. B\n                                                  -   \nDA\n         1.0000 \n $                               -   \n8\nTrue-up Adjustment with Interest\nAttachment 3, Line 9, Col. J\n                                                  -   \nDA\n         1.0000 \n $                               -   \n9\nNET ANNUAL TRANSMISSION REVENUE REQUIREMENT\n(Line 1 less Line 6 plus Lines 7 and 8)\n $                               -"},{"page":63,"startToken":23438,"endToken":23918,"text":"Page 2 of 5\nRate Formula Template\nUtilizing FERC Form 1 Data\nDesertLink, LLC\nFor the 12 months ended\n12/31/__\nLine\n(1)\n(2)\n(3)\n(4)\n(5)\nNo.\nRATE BASE: (Note R)\nSource\nCompany Total\nAllocator (W)\nTransmission\nGROSS PLANT IN SERVICE\nNote C\n(Col 3 times Col 4)\n1\nProduction\n205.46.g for end of year, records for other months\n                                                  -   \nN/A\n                 -   \n                                  -   \n2\nTransmission\nAttachment 4, Line 14, Col. (b)\n                                                  -   \nTP\n         1.0000 \n                                  -   \n3\nDistribution\n207.75.g for end of year, records for other months\n                                                  -   \nN/A\n                 -   \n                                  -   \n4\nGeneral & Intangible\nAttachment 4, Line 14, Col. (c)\n                                                  -   \nWS\n         1.0000 \n                                  -   \n5\nTOTAL GROSS PLANT\n(Sum of Lines 1 through 4)\n                                                  -   \nGP=\n         1.0000 \n                                  -   \n6\nACCUMULATED DEPRECIATION\nNote C\n7\nProduction\n219.20-24.c for end of year, records for other months\n                                                  -   \nN/A\n                 -   \n                                  -   \n8\nTransmission\nAttachment 4, Line 14, Col. (h)\n                                                  -   \nTP\n         1.0000 \n                                  -   \n9\nDistribution\n219.26.c for end of year, records for other months\n                                                  -   \nN/A\n                 -   \n                                  -   \n10\nGeneral & Intangible\nAttachment 4, Line 14, Col. (i)\n                                                  -   \nWS\n         1.0000 \n                                  -   \n11\nTOTAL ACCUM. DEPRECIATION\n(Sum of Lines 7 through 10)\n                                                  -   \n                                  -   \n12\nNET PLANT IN SERVICE\n13\nProduction\n(Line 1 - Line 7)\n                                              -   \n                               -   \n14\nTransmission\n(Line 2 - Line 8)\n                                              -   \n                               -   \n15\nDistribution\n(Line 3 - Line 9)\n                                              -   \n                               -   \n16\nGeneral & Intangible\n(Line 4 - Line 10)\n                                              -   \n                               -   \n17\nTOTAL NET PLANT\n( Sum of Lines 13 through 16)\n                                              -   \nNP=\n         1.0000 \n                               -   \n18\nADJUSTMENTS TO RATE BASE\n19\nAccount No. 281 (enter negative)\nAttachment 4, Line 28, Col. (d) (Note D)\n                                              -   \nN/A\n                 -   \n                               -   \n20\nAccount No. 282 (enter negative)\nAttachment 4, Line 28, Col. (e) (Note D)\n                                              -   \nNP\n         1.0000 \n                               -   \n21\nAccount No. 283 (enter negative)\nAttachment 4, Line 28, Col. (f) (Note D)\n                                              -   \nNP\n         1.0000 \n                               -   \n22\nAccount No. 190\nAttachment 4, Line 28, Col. (g) (Note D)\n                                              -   \nNP\n         1.0000 \n                               -   \n22a\nDeficient or (Excess) Accumulated Deferred Income Taxes\nAttachment 13, Line 7 (Note X)\n                                                  -   \nNP\n         1.0000 \n                               -   \n23\nAccount No. 255 (enter negative)\nAttachment 4, Line 28, Col. (h) (Note D)\n                                              -   \nNP\n         1.0000 \n                               -   \n24\nUnfunded Reserves (enter negative)\nAttachment 4, Line 43, Col. (h)\n                                              -   \nDA\n         1.0000 \n                               -   \n25\nCWIP\nAttachment 4, Line 14, Col. (d)\n                                              -   \nDA\n         1.0000 \n                               -   \n26\nUnamortized Regulatory Asset\nAttachment 4, Line 28, Col. (b) (Note E)\n                                              -   \nDA\n         1.0000 \n                               -   \n27\nUnamortized Abandoned Plant\nAttachment 4, Line 28, Col. (c) (Note F)\n                                              -   \nDA\n         1.0000 \n                               -   \n28\nTOTAL ADJUSTMENTS\n( Sum of Lines 19 through 27)\n                                              -   \n                                  -   \n29\nLAND HELD FOR FUTURE USE\nAttachment 4, Line 14, Col. (e) (Note G)\n                                              -   \nTP\n         1.0000 \n                               -   \n30\nWORKING CAPITAL\nNote H\n31\nCash Working Capital\n1/8*(Page 3, Line 17 minus Page 3, Line 14)\n                                              -   \n                               -   \n32\nMaterials & Supplies\nAttachment 4, Line 14, Col. (f)\n                                              -   \nTP\n         1.0000 \n                               -   \n33\nPrepayments (Account 165)\nAttachment 4, Line 14, Col. (g)\n                                              -   \nGP\n         1.0000 \n                               -   \n34\nTOTAL WORKING CAPITAL\n( Sum of Lines 31 through 33)\n                                              -   \n                                  -   \n35\nRATE BASE\n( Sum of Lines 17, 28, 29, and 34)\n                                              -   \n                                  -   \nFormula Rate - Non-Levelized"},{"page":64,"startToken":23918,"endToken":24447,"text":"Page 3 of 5\nRate Formula Template\nUtilizing FERC Form 1 Data\nDesertLink, LLC\nFor the 12 months ended\n12/31/__\nLine\n(1)\n(2)\n(3)\n(4)\n(5)\nNo.\nSource\nCompany Total\nAllocator (W)\nTransmission\nO&M\n(Col 3 times Col 4)\n1\nTransmission\n321.112.b\n                                                  -   \nTP\n         1.0000 \n                                  -   \n2\nLess Account 566 (Misc Trans Expense)\n321.97.b\n                                                  -   \nTP\n         1.0000 \n                                  -   \n3\nLess Account 565\n321.96.b\n                                                  -   \nTP\n         1.0000 \n                                  -   \n4\nA&G\n323.197.b\n                                                  -   \nWS\n         1.0000 \n                                  -   \n5\nLess FERC Annual Fees\n351.h (Note I)\n                                                  -   \nWS\n         1.0000 \n                                  -   \n6\nLess EPRI Dues\nNote J\n                                                  -   \nWS\n         1.0000 \n                                  -   \n7\nLess Reg. Commission Expense Account 928\nNote J\n                                                  -   \nWS\n         1.0000 \n                                  -   \n8\nLess: Non-safety Advertising account 930.1\nNote J\n                                                  -   \nWS\n         1.0000 \n                                  -   \n9\n10\nPlus Transmission Related Reg. Comm. Exp.\nNote K\n                                                  -   \nTP\n         1.0000 \n                                  -   \n11\n12\nPlus Transmission Lease Payments in Acct 565\nNote V\n                                                  -   \nDA\n         1.0000 \n                                  -   \n13\nAccount 566\n14\nAmortization of Regulatory Asset\nNote E\n                                                  -   \nDA\n         1.0000 \n                                  -   \n15\nMisc. Transmission Expense (less amort. of regulatory asset)\n321.97.b less line 14\n                                                  -   \nTP\n         1.0000 \n                                  -   \n16\nTotal Account 566\n(Sum of Lines 14 through 15) Ties to 321.97b\n                                                  -   \n                                  -   \n17\nTOTAL O&M\n                                                  -   \n                                  -   \n18\nDEPRECIATION EXPENSE\nNote C\n19\nTransmission\n336.7.b&d\n                                                  -   \nTP\n         1.0000 \n                                  -   \n20\nGeneral & Intangible\n336.10.b&d, 336.1.b&d\n                                                  -   \nWS\n         1.0000 \n                                  -   \n21\nAmortization of Abandoned Plant\nNote F\n                                                  -   \nDA\n         1.0000 \n                                  -   \n22\nTOTAL DEPRECIATION\n(Sum of Lines 19 through 21)\n                                                  -   \n                                  -   \n23\nTAXES OTHER THAN INCOME TAXES   (Note M)\n24\nLABOR RELATED\n25\nPayroll\n263.i\n                                                  -   \nWS\n         1.0000 \n                                  -   \n26\n263.i\n                                                  -   \nWS\n         1.0000 \n                                  -   \n27\nPLANT RELATED\n28\nProperty\n263.i\n                                                  -   \nGP\n         1.0000 \n                                  -   \n29\nGross Receipts\n263.i\n                                                  -   \nN/A\n         \n                                  -   \n30\nOther\n263.i\n                                                  -   \nGP\n         1.0000 \n                                  -   \n31\nPayments in lieu of taxes\n263.i\n                                                  -   \nGP\n         1.0000 \n                                  -   \n32\nTOTAL OTHER TAXES\n( Sum of Lines 25 through 31)\n                                                  -   \n                                  -   \n33\nINCOME TAXES    (Note N)\nNote N\n34\nT=1 - {[(1 - SIT) * (1 - FIT)] / (1 - SIT * FIT * p)}\n0.00%\n35\nCIT=(T/1-T) * (1-(WCLTD/R)) =\nWCLTD = Page 4, Line 15, R = Page 4, Line 18\n0.00%\n36\nFIT & SIT & P\n37\n38\n1 / (1 - T)  = (from line 35)\n1 / (1 - T), T from Line 35\n                                         1.0000 \n39\nAmortized Investment Tax Credit\n266.8f (enter negative) (Note D)\n                                                  -   \n40\nDeficient or (Excess) Deferred Income Taxes\nAttachment 13, Line 12, Col. (d) (Note X)\n                                                  -   \n41\nTax Effect of Permanent Differences\nNote O\n                                                  -   \n42\nIncome Tax Calculation\n(Line 35 times Line 48)\n                                                  -   \nN/A\n                                  -   \n43\nITC adjustment\n(Line 38 times Line 39)\n                                                  -   \nNP\n         1.0000 \n                                  -   \n44\nDeficient or (Excess) Deferred Income Tax Adjustment\nAttachment 13, Line 12, Col. (f) (Note X)\n                                                  -   \nNP\n         1.0000 \n                                  -   \n45\nPermanent Differences Tax Adjustment\n(Line 38 times Line 41)\n                                                  -   \nNP\n         1.0000 \n                                  -   \n46\nTotal Income Taxes\n(Sum of Lines 42 through 45)\n                                                  -   \n                                  -   \n47\nRETURN\n48\nRate Base times Return\n(Page 2, Line 35 times Page 4, Line 18)\n                                                  -   \nN/A\n                 -   \n                                  -   \n49\nGROSS REVENUE REQUIREMENT\n( Sum of Lines  17, 22, 32, 46, and 48)\n                                                  -   \n                                  -   \n(Sum of Lines 1, 4, 10, 12, and 16 less Sum of Lines 2, 3, and 5 \nthrough 8)\nHighway and vehicle"},{"page":65,"startToken":24447,"endToken":24717,"text":"Formula Rate - Non-Levelized\nPage 4 of 5\nRate Formula Template\nUtilizing FERC Form 1 Data\nDesertLink, LLC\nFor the 12 months ended\n12/31/__\nLine\n(1)\n(2)\n(3)\n(4)\n(5)\nNo.\nSUPPORTING CALCULATIONS AND NOTES\nTRANSMISSION PLANT INCLUDED IN ISO RATES\n1\nTotal Transmission plant\n(Page 2, Line 2, Col. 3)\n                                  -   \n2\n(Note P)\n                                  -   \n3\n(Note S)\n                                  -   \n4\nTransmission plant included in ISO rates\n(Line 1 minus Lines 2 and 3)\n                                  -   \n5\nPercentage of Transmission plant included in ISO Rates\n(Line 4 divided by Line 1)\nTP =                               1.00 \n6\nWAGES & SALARY ALLOCATOR (W&S)\nForm 1 Reference\n$\nTP\nAllocation\n7\nProduction\n354.20.b\n                                                  -   \n            -                    -   \n8\nTransmission\n354.21.b\n                                                  -   \n        1.00                  -   \n9\nDistribution\n354.23.b\n                                                  -   \n            -                    -   \nW&S Allocator\n10\nOther\n354.24,25,26.b\n                                                  -   \n            -                    -   \n($ / Allocation)\n11\nTotal (W&S Allocator is 1 if lines 7-10 are zero)\n(Sum of Lines 7 through 10)\n                                                  -   \n                 -   \n=\n                        1.00000  = WS\n12\nRETURN (R)\n13\n14\n$\n%\nCost\nWeighted\n15\nLong Term Debt\nAttachment 5, Line 8 (Notes Q & R)\n                                                  -   \n50.0%\n0.00%\n0.00% = WCLTD\n16\nPreferred Stock (112.3.c)\nAttachment 5, Line 9 (Notes Q & R)\n                                                  -   \n0.0%\n0.00%\n0.00%\n17\nCommon Stock\nAttachment 5, Line 10 (Notes Q, R, and T)\n                                                  -   \n50.0%\n9.80%\n4.90%\n18\nTotal\n( Sum of Lines 15 through 17)\n                                                  -   \n4.90% = R\n19\nREVENUE CREDITS\n$\n20\nAttachment 12, Line 8, Col. C (Note U)\n                                  -   \n21\nACCOUNT 456.1 (OTHER ELECTRIC REVENUES)\nAttachment 12, Line 18, Col. C (Note A)\n                                  -   \nLess Transmission plant excluded from ISO rates\nLess Transmission plant included in OATT Ancillary Service \nrates\nACCOUNT 454 (RENT FROM ELECTRIC"},{"page":66,"startToken":24717,"endToken":26292,"text":"Formula Rate - Non-Levelized\nPage 5 of 5\nRate Formula Template\nUtilizing FERC Form 1 Data\nDesertLink, LLC\nFor the 12 months ended\n12/31/__\nGeneral Note: References to pages in this formula rate template are indicated as: (Page #, Line #, Col. #)\nReferences to data from FERC Form 1 are indicated as: #.y.x (page, line, column)\nNotes\nA\nB\nCompany will not have any grandfathered agreements. Therefore, this line shall remain zero.\nC\nPlant In Service, Accumulated Depreciation, and Depreciation Expenses shall exclude Asset Retirement Obligation amounts.\nD\nE\nF\nUnamortized Abandoned Plant and Amortization of Abandoned Plant will be zero until the Commission accepts or approves recovery of the cost of Abandoned Plant. Utility must submit a Section 205 filing to recover the cost of abandoned plant.\nG\nIdentified in FERC Form 1, or Company records if not so indicated on the FERC Form 1, as being transmission related.\nH\nI\nJ\nPage 3, Line 6 - Subtract all EPRI Annual Membership Dues listed in Form 1 at 353.f, all Regulatory Commission Expenses in account 928 itemized at 351.h, and non-safety related advertising included in Account 930.1.\nK\nPage 3, Line 8-Add back Regulatory Commission Expenses directly related to transmission service, ISO filings, or transmission siting itemized at 351.h.\nM\nN\nInputs Required:\nFIT = \n0.0%\n(Weighted Average Federal Income Tax Rate (Attachment 7, line 4, col. (i))\nSIT = \n0.0%\n(Weighted Average State Income Tax Rate (Attachment 7, line 8, col. (i))\np = \n0.0%\n(Percent of federal income tax deductible for state purposes)\nO\nP\nRemoves transmission plant determined by Commission order to be state-jurisdictional according to the seven-factor test (until Form 1 balances are adjusted to reflect application of seven-factor test).\nQ\nR\nS\nT\nThe rate of return on common equity (\"ROE\") will be supported in the original Section 205 filing and shall, at no time during the life of the Project, be higher than 9.8%, including adders.  No change in ROE may be made absent a filing with FERC.\nU\nIncludes only income related to transmission facilities, such as pole attachments, rentals and special use from general ledger.\nV\nAdd back any lease expense of transmission assets used to provide service under this tariff included in account 565. Amount to be obtained from company books and records.\nW\nDA = Direct Assignment; GP = Gross Plant Allocator (page 2, line 5); N/A = Not Applicable; NP = Net Plant Allocator (page 2, line 17); TP = Transmission Plant Allocator (page 4, line 5); WS = Wage and Salary Allocator (page 4, line 11).\nX\nThe revenues credited on page 1, lines 2-6, shall include only the amounts received by DesertLink for service rendered using facilities for which recovery is provided under this tariff. They do not include revenues associated with FERC annual charges, gross \nreceipts taxes, or facilities not included in this template (e.g., direct assignment facilities and GSUs) which are not recovered under this Rate Formula Template.\nAccumulated deferred income tax amounts associated with asset or liability accounts excluded from rate base (such as ADIT related to asset retirement obligations and certain tax-related regulatory assets or liabilities) do not affect rate base.  Balance of Account \n255 will be reduced by prior flow throughs and excluded if the utility chooses to utilize amortization of tax credits against taxable income. Account 281 is not allocated to Transmission.\nRecovery of Regulatory Asset permitted only for pre-commercial and formation expenses as authorized by the Commission. Recovery of any other regulatory assets requires authorization from the Commission. A carrying charge equal to the AFUDC rate will \nbe applied to the Regulatory Asset prior to the rate year when costs are first recovered.\nCash Working Capital assigned to transmission is one-eighth of O&M allocated to transmission at page 3, line 17, column 5 minus amortization of Regulatory Asset at page 3, line 14, column 5.  Prepayments are the electric related prepayments booked to \nAccount No. 165 and reported on page 111, line 57 in the Form 1.\nThe FERC's annual charges for the year assessed the Transmission Owner for service under this tariff.  To the extent the charges are separately identified on the FERC Form 1, page 350, column 1, the line number will be added to the source in Column 2 for \nreference.  Line item references can change from year to year.  Items not specifically identified in the FERC Form 1, page 350 will be obtained from Company books and records.\nIncludes only FICA, unemployment, highway, property, gross receipts, and other assessments charged in the current year.  Taxes related to income are excluded.  Enter the line number on page 262-63 upon which each item is identified.  To the extent individual \ntypes of taxes are separately identified on the FERC Form 1, page 262, column a, the line number will be added to the source in Column 2 for reference.  Line item references can change from year to year.  Items not specifically identified in the FERC Form 1, \npage 262-63 will be obtained from Company books and records.\nFIT is the weighted average Federal income tax rate and SIT is the weighted average State income tax rate, both from Attachment 7, and p is the \"the percentage of federal income tax deductible for state income taxes\". A utility that elected to utilize amortization \nof tax credits against taxable income, rather than book tax credits to Account No. 255 and reduce rate base, must reduce its income tax expense by the amount of the Amortized Investment Tax Credit (Form 1, 266.8.f) multiplied by (1/1-T) (page 3, line 26).  \nExcess Deferred Income Taxes reduce income tax expense by the amount of the expense multiplied by (1/(1-T)).\nThe Tax Effect of Permanent Differences captures the differences in the income taxes due under the Federal and State calculations and the income taxes calculated in Appendix III that are not the result of a timing difference. Tax Effect equals Permanent \nDifferences multiplied by T.\nThe cost of debt will be determined based on the financing in place during each stage of project development. Before debt is obtained, a proxy interest rate which will be supported in the original Section 205 filing will be used. This rate is provided on \nAttachment 8 line 36. If construction debt (wherein principal is drawn down over time) is issued, the rate plus an amortization of fees projected to be incurred on the construction debt during the rate year will be the cost of debt. This construction debt rate \n(inclusive of fees) will be reset and trued-up every year using the method on Attachment 9 for multi-year construction projects. Once non-construction debt is obtained, the actual interest rate and fees on the debt in place at the end of the year such non-\nconstruction debt is obtained will become the cost of debt. In the first full year after non-construction debt is obtained, the cost of debt will be the actual cost of debt determined using the method on Attachment 5. \nA h\nh i\nl\ni l\nf 50% E\ni\nd 50% d b\nill b\nd\nil h fi\ni i\ni\nl\nd i\ni\nil\nh\ni\nh\ni\nd b\nh C\ni i\nAf\nh f\nili i\nl\nd i\ni\nh l\nf\n50%\ni\nh\nh i\nl\nCalculate rate base using 13 month average balance, except ADIT.  The calculation of ADIT in the annual true-up calculation will use the beginning-of-year and end-of-year balances, and will be performed in accordance with IRS regulation Section 1.167(l)-\n1(h)(6).  The calculation of ADIT in the annual projection will be performed in accordance with IRS Regulation Section 1.167(l)-1(h)(6). \nRemoves dollar amount of transmission plant to be included in the development of OATT ancillary services rates and generation step-up facilities, which are deemed to be included in OATT ancillary services. For these purposes, generation step-up facilities are \nthose facilities at a generator substation on which there is no through-flow when the generator is shut down.\nUpon enactment of changes in tax law, ADIT balances are re-measured and adjusted in the Company’s books of account, resulting in excess or deficient accumulated deferred income tax assets and liabilities.  Excess or deficient ADIT attributable to timing \ndifferences between the amounts of expenses or revenues recognized for income tax purposes and amounts of expenses or revenues recognized for ratemaking purposes as well as subsequent recoverable or refundable amortization of such amounts will be based \nupon Company records and be calculated and recorded in accordance with ASC 740 and any applicable normalization requirements of the taxing jurisdiction.  The Deficient or (Excess) Deferred Income Tax Adjustment (page 3, line 44) is computed by \nmultiplying each component of Deficient or (Excess) Deferred Income Taxes (page 3, line 40) by the applicable tax gross-up factor.  For each re-measurement of ADIT, the amounts entered as the Deficient or (Excess) Accumulated Deferred Income Taxes \ncomponent of ADJUSTMENTS TO RATE BASE (page 2, line 22a) or as the Deficient or (Excess) Deferred Income Tax Adjustment component of INCOME TAXES (page 3, line 44) will be supported by Attachment 13 (Deficient or Excess Accumulated \nDeferred Income Taxes) providing the balance for each taxing jurisdiction at the beginning and end of the year, amortization for the year, calculation of the gross-up to the revenue requirement level and any other information required to support compliance with \nany applicable normalization requirements."},{"page":67,"startToken":26292,"endToken":26624,"text":"Page 1 of 3\nFor the twelve months ended 12/31/__\nAttachment 1\nProject Revenue Requirement Worksheet\nDesertLink, LLC\nTo be completed in conjunction with Appendix III.\nLine\n(1)\n(2)\n(3)\n(4)\nNo.\nAppendix III, Page, Line, Col.\nTransmission\nAllocator\n1\nGross Transmission Plant plus CWIP\nAppendix III, p 2, line 2, col 5 plus line 25, col 5 (Note A)\n                                                         -   \n2\nNet Transmission Plant plus CWIP and Abandoned Plant\nAppendix III, p 2, line 14, col 5 plus line 25 & 27, col 5 (Note B)\n                                                         -   \nO&M EXPENSE\n3\nTotal O&M Allocated to Transmission\nAppendix III, p 3, line 17, col 5\n                                                         -   \n4\nAnnual Allocation Factor for O&M\n(line 3 divided by line 1, col 3)\n0.00%\n0.00%\nGENERAL AND INTANGIBLE (G&I) DEPRECIATION EXPENSE\n5\nTotal G&I Depreciation Expense\nAppendix III, p 3, line 20, col 5 (Note C)\n                                                         -   \n6\nAnnual Allocation Factor for G&I Depreciation Expense\n(line 5 divided by line 1, col 3)\n0.00%\n0.00%\nTAXES OTHER THAN INCOME TAXES\n7\nTotal Other Taxes\nAppendix III, p 3, line 32, col 5\n                                                         -   \n8\nAnnual Allocation Factor for Other Taxes\n(line 7 divided by line 1, col 3)\n0.00%\n0.00%\n9\nLess Revenue Credits\nAppendix III, p 1, line 6 col 5\n                                                         -   \n10\nAnnual Allocation Factor for Revenue Credits\n(line 9 divided by line 1, col 3)\n0.00%\n0.00%\n11\nAnnual Allocation Factor for Expense\nSum of lines 4, 6, 8, and 10\n0.00%\nINCOME TAXES \n12\nTotal Income Taxes\nAppendix III, p 3, line 46, col 5\n                                                         -   \n13\nAnnual Allocation Factor for Income Taxes\n(line 12 divided by line 2, col 3)\n0.00%\n0.00%\nRETURN\n14\nReturn on Rate Base\nAppendix III, p 3, line 48, col 5\n                                                         -   \n15\nAnnual Allocation Factor for Return on Rate Base\n(line 14 divided by line 2, col 3)\n0.00%\n0.00%\n16\nAnnual Allocation Factor for Return\nSum of lines 13 and 15\n0.00%"},{"page":68,"startToken":26624,"endToken":26825,"text":"Page 2 of 3\nFor the twelve months ended 12/31/__\nAttachment 1\nProject Revenue Requirement Worksheet\nDesertLink, LLC\nAny hypothetical amounts or project names in a filed template will be removed and replaced with actual amounts in the first year actual values are available without the need for a section 205 filing to modify the template.\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\nProject Name\nCAISO Category\nIdentifier\nProject Gross Plant\nProject Net Plant\nAnnual Return Charge\n(Note D)\n(Page 1, line 11)\n(Col. 3 * Col. 4)\n(Note E)\n(Page 1, line 16)\n(Col. 6 * Col. 7)\n1a\nProject A\nAAAA\n                                                  -   \n0.00%\n                       -    $                                                      -   \n0.00%\n                                        -   \n1b\nProject B\nBBBB\n                                                  -   \n0.00%\n                       -    $                                                      -   \n0.00%\n                                        -   \n2\nTotal Schedule 12\n                                                  -   \n                       -    $                                                      -   \n                                        -   \n3a\nProject C\nCCCC\n                                                  -   \n0.00%\n                       -    $                                                      -   \n0.00%\n                                        -   \n3b\nProject D\nDDDD\n                                                  -   \n0.00%\n                       -    $                                                      -   \n0.00%\n                                        -   \n4\nTotal Zonal\n                                                  -   \n                       -    $                                                      -   \n                                        -   \n5\nOther\n                                                  -   \n0.00%\n                       -    $                                                      -   \n0.00%\n                                        -   \n6\nAnnual Totals\n                                                  -   \n                       -    $                                                      -   \n                                        -   \nThis worksheet is used to compute project specific revenue requirements for any projects for which such calculation is required by CAISO. Other projects which comprise the remaining revenue requirement on Appendix III will \nnot be entered on this schedule.\nLine \nNo.\nAnnual Allocation \nFactor for Expense\nAnnual \nExpense \nCharge\nAnnual \nAllocation \nFactor for \nReturn"},{"page":69,"startToken":26825,"endToken":27271,"text":"Page 3 of 3\nFor the twelve months ended 12/31/__\nAttachment 1\nProject Revenue Requirement Worksheet\nDesertLink, LLC\n(9)\n(10)\n(11)\n(12)\n(12a)\n(13)\n(14)\n(15)\n(16)\nIncentive Return\nCeiling Rate\n(Note F)\n(Sum Col. 5, 8 & 9)\n(Note G)\n(Sum Col. 10 & 12)\n(Note H)\n(Sum Col. 10 & 12 Less Col. 13)\n(Note I)\n(Sum Col. 14 & 15)\n1a\n                                         -                             -   \n                              -                                              -   \n                             -                          -                                                            -                          -                                           -   \n1b\n                                         -                             -   \n                              -                                              -   \n                             -                          -                                                            -                          -                                           -   \n2\n                                         -                                 -   \n                                                  -                                -                          -                                                            -                          -                                           -   \n3a\n                                         -                             -   \n                              -                                              -   \n                             -                          -                                                            -                          -                                           -   \n3b\n                                         -                             -   \n                              -                                              -   \n                             -                          -                                                            -                          -                                           -   \n4\n                                         -                                 -   \n                                                  -                                -                          -                                                            -                          -                                           -   \n5\n                                         -                             -   \n                              -                                              -   \n                             -                          -                                                            -                          -                                           -   \n6\n                                         -                                 -   \n                                                  -                                -                          -                                                            -                          -                                           -   \nNotes\nA\nGross Transmission Plant is that identified on page 2 line 2 of Appendix III inclusive of any CWIP or unamortized abandoned plant included in rate base when authorized by FERC order.\nB\nNet Plant is that identified on page 2 line 14 of Appendix III inclusive of any CWIP or unamortized Abandoned Plant included in rate base when authorized by FERC order less any prefunded AFUDC, if applicable.\nC\nD\nE\nProject Net Plant is the Project Gross Plant Identified in Column 3 less the associated Accumulated Depreciation plus CWIP in rate base if applicable and Unamortized Abandoned Plant.  Refer to Attachment 1a for detail.\nF\nG\nRequires approval by FERC of incentive return applicable to the specified project(s).\nH\nI\nTrue-Up Adjustment is calculated on the Project True-up Schedule for the relevant true-up year.\nLine \nNo.\nProject \nDepreciation/Amortizatio\nn Expense\nAnnual Revenue \nRequirement\nIncentive Return in \nBasis Points\nCompetitive \nConcession\nTotal Annual Revenue \nRequirement\nTrue-Up \nAdjustment\nNet Revenue \nRequirement\n(Attachment 2, Line 28 Incentive \nReturn * Col. 6 * Col. 11/100)\nGeneral and Intangible Depreciation and Amortization Expense includes all expenses (except depreciation and armortization of G&I Asset Retirement Obligations) not directly associated with a project, which is entered on page 3 , \ncolumn 9.\nProject Gross Plant is the total capital investment including CWIP for the project calculated from Company books and records in the same method as the gross plant value in line 1.  This value includes subsequent capital \ninvestments required to maintain the facilities to their original capabilities.  Refer to Attachment 1a for detail.\nProject Depreciation Expense is the actual value booked for the project (excluding General and Intangible depreciation) at Appendix III, page 3, line 19, plus amortization of Abandoned Plant at Appendix III, page 3, line 21.  For \neach project on Attachment 1a, Depreciation Expense is Attachment 1a, Line 2, Column (15) minus Column (3), and Amortization of Abandoned Plant is the difference between Columns (3) and (15) on Attachment 1a, Line 4.\nThe Competitive Concession is the reduction in revenue, if any, that the company agreed to, for instance, to be selected to build facilities as the result of a competitive process and equals the amount by which the  annual revenue \nrequirement is reduced from the ceiling rate."},{"page":70,"startToken":27271,"endToken":27599,"text":"Att 1a - Project Plant Detail\n Page 10\nPage 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 1a\nProject Plant Detail Worksheet\nDesertLink, LLC\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\n(15)\nProject Name\n13-month average\n1a\nProject A\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n1b\nProject B\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n…\n…\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n1\nTotal Project Transmission Gross Plant\n                                                                -                                -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\n(15)\nProject Name\n13-month average\n2a\nProject A\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n2b\nProject B\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n…\n…\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n2\nTotal Project Transmission Accumulated Depreciation\n                                                                -                                -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\n(15)\nProject Name\n13-month average\n3a\nProject A\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n3b\nProject B\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n…\n…\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n3\nTotal Project CWIP\n                                                                -                                -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\n(15)\nProject Name\n13-month average\n4a\nProject A\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n4b\nProject B\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n…\n…\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n4\nTotal Project Unamortized Abandoned Plant\n                                                                -                                -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n(1)\n(2)\nProject Name\n5a\nProject A\n                                                                -   \n5b\nProject B\n                                                                -   \n…\n…\n … \n5\nTotal Project Transmission Net Plant\n                                                                -   Ties to Appendix III, p 2, line 14, col 5 plus line 25 & 27, col 5; Used on Attachment 1, Column (6) \nLine \nNo.\nProject\nTransmission \nGross Plant\n20__\nDecember\n20__\nJanuary\n20__\nFebruary\n20__\nMarch\n20__\nApril\n20__ \nMay\n20__ \nJune\n20__ \nJuly\n20__\nAugust\n20__\nSeptember\n20__\nOctober\n20__ \nNovember\n20__\nDecember\nLine \nNo.\nProject\nTransmission Accumulated \nDepreciation \n20__\nDecember\n20__\nJanuary\n20__\nFebruary\n20__\nMarch\n20__\nApril\n20__ \nMay\n20__ \nJune\n20__ \nJuly\n20__\nAugust\n20__\nSeptember\n20__\nOctober\n20__ \nNovember\n20__\nDecember\nLine \nNo.\nProject CWIP\n20__\nDecember\n20__\nJanuary\n20__\nFebruary\n20__\nMarch\n20__\nApril\n20__ \nMay\n20__ \nJune\n20__ \nJuly\n20__\nAugust\n20__\nSeptember\n20__\nOctober\n20__ \nNovember\n20__\nDecember\nLine \nNo.\nProject \nUnamortized Abandoned Plant\n20__\nDecember\n20__\nJanuary\n20__\nFebruary\n20__\nMarch\n20__\nApril\n20__ \nMay\n20__ \nJune\n20__ \nJuly\n20__\nAugust\n20__\nSeptember\n20__\nOctober\n20__ \nNovember\n20__\nDecember\nLine \nNo.\nProject\nTransmission \nNet Plant\n13-month average\n(Line 1 - Line 2 + Line 3 + Line 4)"},{"page":71,"startToken":27599,"endToken":28076,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 2\nIncentive Return\nDesertLink, LLC\nLine\n1\nRate Base\nAppendix III, Page 2, Line 35, Col.5\n                                                                         -   \n2\n100 Basis Point Incentive Return\n$\nCost\n$\n%\nWeighted\n3\nLong Term Debt\n(Notes Q & R from Appendix III) \n                            -   \n50.00%\n0.00%\n0.00%\n4\nPreferred Stock\n(Notes Q & R from Appendix III) \n                            -   \n0.00%\n0.00%\n0.00%\n5\nCommon Stock\n(Notes Q, R, & T from Appendix III)\n                            -   \n50.00%\n10.80%\n5.40%\n6\nTotal (sum lines 3-5)\n                            -   \n5.40%\n7\n100 Basis Point Incentive Return multiplied by Rate Base (line 1 * line 6)\n                                                                         -   \n8\nINCOME TAXES\n9\nT=1 - {[(1 - SIT) * (1 - FIT)] / (1 - SIT * FIT * p)} =\n0.00%\n10\nCIT=(T/1-T) * (1-(WCLTD/R)) =\n0.00%\n11\nWCLTD\nLine 3\n0.00%\n12\nFIT, SIT & p are as given in Appendix III footnote N.\n13\n1 / (1 - T)\nLine 9\n                    1.0000 \n14\nAmortized Investment Tax Credit (266.8f) (enter negative)\nAppendix III, Page 3, Line 39\n                            -   \n15\nDeficient or (Excess) Deferred Income Taxes\nAppendix III, Page 3, Line 40\n                            -   \n16\nTax Effect of Permanent Differences (Note B)\nAppendix III, Page 3, Line 41\n                            -   \n17\nIncome Tax Calculation\nLine 7 times Line 10\n                        -   \n18\nITC adjustment\nLine 13 times Line 14\n                            -   \nNP             1.00                         -   \n19\nDeficient or (Excess) Deferred Income Tax Adjustment\nAppendix III, Page 3, Line 44\n                            -   \nNP             1.00                         -   \n20\nPermanent Differences Tax Adjustment\nLine 13 times Line 16\n                            -   \nNP             1.00                         -   \n21\nTotal Income Taxes\nSum of Lines 17 through 20\n                            -   \n                        -                                                                            -   \n22\nReturn and Income Taxes with 100 basis point increase in ROE\n                                                                         -   \n23\nReturn\n(Appendix III, page 3, line 48, col 5)\n                                                                         -   \n24\nIncome Tax\n(Appendix III, page 3, line 46, col 5)\n                                                                         -   \n25\nReturn and Income Taxes without 100 basis point increase in ROE\nSum of Lines 23 and 24\n                                                                         -   \n26\nIncremental Return and Income Taxes for 100 basis point increase in ROE\nLine 22 less Line 25\n                                                                         -   \n27\nRate Base\nLine 1\n                                                                         -   \n28\nIncremental Return and Income Taxes for 100 basis point increase in ROE divided by Rate Base Line 26 divided by Line 27\n0.00%\nNotes\nA\nB\nThe Tax Effect of Permanent Differences captures the differences in the income taxes due under the Federal and State calculations and the income taxes calculated in Appendix III that are not the result of a timing difference.\nCost = Appendix III, Page 4, Line 17, \nplus 100 bp\nThe 100 basis point increase in ROE is used only to determine the increase in return and income taxes associated with a 100 basis point increase in ROE and does not reflect what incentives the Commission \nmay approve for a specific transmission project. The overall ROE inclusive of incentives is subject to the limitations noted in Appendix III, Note T.  Any ROE actual incentive must be approved by the \nCommission."},{"page":72,"startToken":28076,"endToken":28622,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 3\nFormula Rate True-Up\nDesertLink, LLC\nAny hypothetical amounts or project names in a filed template will be removed and replaced with actual amounts in the first year actual values are available without the need for a section 205 filing to modify the template.\nAnnual True-Up Calculation\nLine\n1\nTrue-Up Year\n2\nC\nD\n                             -   \nF\nG\nH\nI\nJ\nA\nB\nE\nProject Name\n3\nRemaining Appendix III\n0.0%\n                             -   \n                               -    $                          -   \n                             -   \n4a\nProject A\nAAAA\n                             -   \n0.0%\n                             -                                  -                                  -    $                          -                                -                                -   \n4b\nProject B\nBBBB\n                             -   \n0.0%\n                             -                                  -                                  -    $                          -                                -                                -   \n5\nTotal Schedule 12\n                             -   \n                             -                                  -                                  -    $                          -                                -                                -   \n6a\nProject C\nCCCC\n                             -   \n0.0%\n                             -                                  -                                  -    $                          -                                -                                -   \n6b\nProject D\nDDDD\n                             -   \n0.0%\n                             -                                  -                                  -    $                          -                                -                                -   \n7\nTotal Zonal\n                             -   \n                             -                                  -                                  -    $                          -                                -                                -   \n8\nOther\n                             -   \n0.0%\n                             -                                  -                                  -    $                          -                                -                                -   \n9\n                             -   \n0.0%\n                             -                                  -                                  -                                -                                -                                -   \n10\n $                          -   Total Interest on True-Up - Attachment 6\nPrior Period Adjustment\nA\nB\nSource\n11\nDescription of Adjustment\n                 -   \nNotes\n1)\nThe revenue received is the total amount of revenue distributed to company in the  year as shown on pages 328-330 of the Form No 1. The Revenue Received is input on line 2, Col. E.\n2)\nFrom the Attachment 1, lines 1a through 6, col. 16 from the template in which the true-up year revenue requirement was initially projected.\n3)\nFrom True-Up revenue requirement template Attachment 1, lines 1a through 6, col. 14.\n4)\n5)\nCorrections to true-ups for previous rate years including interest will be computed on Attachment 11 and entered on the appropriate line 3-8 above.\nThis Attachment 3 is used to calculate the annual formula rate true-up. Any projects for which the RTO requires a true-up on an individual project basis, as shown on Attachment 1, will be computed separately. The remainder of the \nrevenue requirement will also be trued up. The utility will individually enter the projected true-up year revenue requirements in Column C. A percentage of total will be calculated in Column D. Actual revenue received during the \ntrue-up year is entered into Column E, line 2 and allocated using the Column D percentage. The utility will prepare this formula rate template with the actual inputs for the true-up year, with the resulting revenue requirement for each \nline being separately entered in Column F.  In Col. G, Col. F is subtracted from Col. E to calculate the true-up adjustment. Interest on the true-up is computed in Column H. Any adjustments to prior period true-ups are entered in Col. \nI.  Col. J computes the total true-up as the sum of Col. G, H and I.\nProjected True-Up Year Revenue \nRequirement Calculation\nTrue-Up Year \nRevenue Received1\nActual True-Up \nYear Revenue Req.\nCAISO \nIdentification\nProject # Or \nOther \nIdentifier\nNet Revenue \nRequirement2\n% of Total \nRevenue  \nRequirement\nAllocation of \nRevenue Received     \n                                   \n                    (E, Line \n2) x (D)\nTrue-Up Net Revenue \nRequirement3\nNet Under/(Over) \nCollection   (F)-(E)\nTrue-Up Interest \nIncome (Expense)4 \n(D) x (H, line 10)\nPrior Period \nAdjustment with \nInterest5\nTotal True-Up        \n(G) + (H) + (I)\nTotal Annual Revenue \nRequirements\nPrior Period Adjustment \n(Note 5)\nAdjustment \nAmount\nAttachment \n11\nInterest due on the true up is calculated for the 24 month period from the start of the true-up year until the end of the year following the true-up year when the true up will be included in rates. Total True up Interest calculate on \nAttachment 6 and allocated to projects based on the percentage in Column D."},{"page":73,"startToken":28622,"endToken":28951,"text":"Page 1 of 2\nFor the twelve months ended 12/31/__\nAttachment 4\nRate Base Worksheet\nDesertLink, LLC\nGross Plant in Service\nCWIP\nLHFFU\nWorking Capital\nAccumulated Depreciation\nMonth\nTransmission\nCWIP in Rate Base\nHeld for Future Use\nMaterials & Supplies\nPrepayments\nTransmission\n(a)\n(b)\n(c) \n(d)\n(e) \n(f)\n(g)\n(h)\n(i)\n(Note A)\n1\nDecember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n2\nJanuary\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n3\nFebruary\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n4\nMarch\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n5\nApril\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n6\nMay\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n7\nJune\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n8\nJuly\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n9\nAugust\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n10\nSeptember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n11\nOctober\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n12\nNovember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n13\nDecember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n14\n                             -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \nAdjustments to Rate Base\nMonth\n(a)\n(b)\n(c) \n(d)\n(e) \n(f)\n(g)\n(h)\n(Note A)\nNote C\nNote D\n272.8.b & 273.8.k\n274.2.b & 275.2.k\n276.9.b & 277.9.k\n234.8.b & c\n15\nDecember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -   \n16\nJanuary\n                   -                                -                                -   \n                                 -   \n17\nFebruary\n                   -                                -                                -   \n                                 -   \n18\nMarch\n                   -                                -                                -   \n                                 -   \n19\nApril\n                   -                                -                                -   \n                                 -   \n20\nMay\n                   -                                -                                -   \n                                 -   \n21\nJune\n                   -                                -                                -   \n                                 -   \n22\nJuly\n                   -                                -                                -   \n                                 -   \n23\nAugust\n                   -                                -                                -   \n                                 -   \n24\nSeptember\n                   -                                -                                -   \n                                 -   \n25\nOctober\n                   -                                -                                -   \n                                 -   \n26\nNovember\n                   -                                -                                -   \n                                 -   \n27\nDecember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -   \n28\n                             -                                -                                  -                                       -                                      -                                      -                                    -   \nLine \nNo\nGeneral & \nIntangible\nGeneral & Intangible\n207.58.g less \n207.57.g for end of \nyear, records for \nother months\n205.5.g & 207.99.g \nless 207.98.g for \nend of year, records \nfor other months\nNote B - page 2, \ncolumn C\n214.47.d for end of \nyear, records for other \nmonths\n227.8.c & 227.16.c for \nend of year, records for \nother months\n111.57.c for end of \nyear, records for other \nmonths\n219.25.c less ARO for \nend of year, records \nfor other months\n219.28.c & 200.21.c \nless ARO for end of \nyear, records for other \nmonths\nAverage of the 13 \nMonthly Balances\nUnamortized \nRegulatory Asset\nUnamortized \nAbandoned Plant\nAccount No. 281 \nAccumulated \nDeferred Income \nTaxes (Note E)\nAccount No. 282 \nAccumulated Deferred \nIncome Taxes (Note E)\nAccount No. 283 \nAccumulated Deferred \nIncome Taxes (Note E)\nAccount No. 190 \nAccumulated \nDeferred Income \nTaxes (Note E)\nAccount No. 255 \nAccumulated \nDeferred Investment \nCredit (Note I)\nConsistent with \n266.8.b & 267.8.h\nAverage of the 13 \nMonthly Balances"},{"page":74,"startToken":28951,"endToken":29657,"text":"Page 2 of 2\nFor the twelve months ended 12/31/\nAttachment 4\nRate Base Worksheet\nDesertLink, LLC\nTotal CWIP\n(a)\n(b)\n(c) = (a) - (b)\nCompany records\n29\nDecember\n                   -                                -                                -                                  -   \n30\nJanuary\n                   -                                -                                -                                  -   \n31\nFebruary\n                   -                                -                                -                                  -   \n32\nMarch\n                   -                                -                                -                                  -   \n33\nApril\n                   -                                -                                -                                  -   \n34\nMay\n                   -                                -                                -                                  -   \n35\nJune\n                   -                                -                                -                                  -   \n36\nJuly\n                   -                                -                                -                                  -   \n37\nAugust\n                   -                                -                                -                                  -   \n38\nSeptember\n                   -                                -                                -                                  -   \n39\nOctober\n                   -                                -                                -                                  -   \n40\nNovember\n                   -                                -                                -                                  -   \n41\nDecember\n                   -                                -                                -                                  -   \n                             -                                -                                  -   \nUnfunded Reserves   (Notes A and F and G)\n(a)\n(b)\n(b.i)\n(b.ii)\n(c) \n(d)\n(e) \n(f)\n(g)\n(h)\nList of all reserves\nAmount\n42a\nReserve 1\n -\n -\n                               -   \n -\n -\n -\n                                 -                                    -   \n42b\nReserve 2\n -\n -\n                               -   \n -\n -\n -\n                                 -                                    -   \n43\nTotal\n                               -   \n                                 -   \nNotes:\nA\nCalculate using 13 month average balance, except ADIT which is calculated based on the average of the beginning of the year and the end of the year balances\nB\nC\nD\nRecovery of abandoned plant is limited to any abandoned plant recovery authorized by FERC.\nE\nADIT is computed using the average of the beginning of the year and the end of the year balances. Electric ADIT only, Excludes ARO-related ADIT.\nF\nG\nH\nI\nBalance of Account 255 will be reduced by prior flow throughs and excluded if the utility chooses to utilize amortization of tax credits against taxable income.\nReconciliation of CWIP in Rate Base to FERC Form 1 - Note B\nLess: CWIP and \nAFUDC Excluded \nfrom Rate Base\nCWIP allowed in \nRate Base\n216.b for end of \nyear, records for \nother months\nAverage of the 13 \nMonthly Balances\nFERC balance sheet \naccount where \nreserves are \nrecorded \nFERC income \nstatement account \nwhere expenses are \nrecorded\nEnter 1 if NOT in a \ntrust or reserved \naccount, enter zero (0) \nif included in a trust or \nreserved account\nEnter 1 if the accrual \naccount is included in \nthe formula rate, enter \n(0) if the accrual \naccount is NOT \nincluded in the formula \nrate\nEnter the percentage \npaid for by customers \nless the percent \nassociated with an \noffsetting liability on \nthe balance sheet (Note \nH)\nAllocation (Plant or \nLabor Allocator)\nAmount Allocated, \ncol. c x col. d x col. e \nx col. f x col. g\nRecovery of CWIP in rate base must be approved by FERC.  Lines 29-41 of page 2 provide a reconciliation of the Company's total CWIP to the CWIP allowed in rate base. The annual report filed pursuant to the Protocols \nwill include for each project under construction (i) the CWIP balance eligible for inclusion in rate base; (ii) the CWIP balance ineligible for inclusion in rate base; and (iii) a demonstration that AFUDC is only applied to \nthe CWIP balance that is not included in rate base The annual report will also describe the reconciliation prepared on this Attachment\nRecovery of a Regulatory Asset is permitted only for pre-commercial and formation expenses, and is subject to FERC approval before the amortization of the Regulatory Asset can be included in rates. Recovery of any \nother regulatory assets requires authorization from the Commission.\nThe Formula Rate shall include a credit to rate base for all unfunded reserves (funds collected from customers that (1) have not been set aside in a trust, escrow or restricted account; (2) whose balance are collected from \ncustomers through cost accruals to accounts that are recovered under the Formula Rate; and (3) exclude the portion of any balance offset by a balance sheet ac count (see Note H)).  Each unfunded reserve will be included \non lines 42 above. The allocator in Col. (g) will be the same allocator used in the formula for the cost accruals to the account that is recovered under the Formula Rate.  Since reserves can be created by creating an \noffsetting balance sheet account, rather than through cost accruals, the amount to be deducted from rate base should exclude the portion offset by another balance sheet account.\nNot all unfunded reserves are created only from contributions from customers. Many are created by creating an offsetting liability in whole or in part.  Column (f) ensures only the portion of the unfunded reserve \ncontributed by the customer (and not created by an offsetting liability) is a reduction to rate base.\nThe inputs in Column (f) are the percentage of the unfunded reserve that was created by an offsetting liability. The percentage shown in Column (f) is then equal to the percentage that customers have contributed to the \nunfunded reserve."},{"page":75,"startToken":29657,"endToken":30034,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 5\nReturn on Rate Base Worksheet\nDesertLink, LLC\nRETURN ON RATE BASE ( R )\n$\n1\nLong Term Interest (117, sum of 62.c through 67.c) (Note D)\n                                -   \n2\nPreferred Dividends (118.29c) (positive number)\n                                -   \n3\nProprietary Capital (Line 25 (c))\n                                -   \n4\nLess Preferred Stock (Line 9) \n                                -   \n5\nLess Account 216.1 Undistributed Subsidiary Earnings (Line 25 (d))     \n                                -   \n6\nLess Account 219 Accum. Other Comprehensive Income (Line 25 (e))        \n                                -   \n7\nCommon Stock\n(Sum of Lines 3 through 6)   \n                                -   \n$\n%\nCost\nWeighted\n8\nLong Term Debt\nLine 25 (a), Note A and Appendix III Note Q\n                                -   \n50.00%\n0.000%\n0.00%\n=WCLTD\n9\nPreferred Stock\nLine 25 (b), Note B and Appendix III Note Q\n                                -   \n0.00%\n0.00%\n0.00%\n10\nCommon Stock\nLine 7, Note C  and Appendix III Notes Q and T\n                                -   \n50.00%\n9.80%\n4.900%\n11\nTotal\n(Sum of Lines 8 through 10)\n                                -   \n4.90%\n=R\n(a)\n(b)\n( c ) \n(d) \n( e ) \nMonthly Balances for Capital Structure\n12\nDecember (Prior Year)\n                               -                                 -                             -                                   -                                 -   \n13\nJanuary\n                               -                                 -                             -                                   -                                 -   \n14\nFebruary\n                               -                                 -                             -                                   -                                 -   \n15\nMarch\n                               -                                 -                             -                                   -                                 -   \n16\nApril\n                               -                                 -                             -                                   -                                 -   \n17\nMay\n                               -                                 -                             -                                   -                                 -   \n18\nJune\n                               -                                 -                             -                                   -                                 -   \n19\nJuly\n                               -                                 -                             -                                   -                                 -   \n20\nAugust\n                               -                                 -                             -                                   -                                 -   \n21\nSeptember\n                               -                                 -                             -                                   -                                 -   \n22\nOctober\n                               -                                 -                             -                                   -                                 -   \n23\nNovember\n                               -                                 -                             -                                   -                                 -   \n24\nDecember\n                               -                                 -                             -                                   -                                 -   \n25\n13-Month Average\n                               -                                 -                             -                                   -                                 -   \nNotes\nA\nB\nPreferred Stock balance will reflect the 13 month average of the balances, of which the 1st and 13th are found on page 112 line 3.c in the Form No. 1\nC\nCommon Stock balance will reflect the 13 month average of the balances, of which the 1st and 13th are found on Form 1 page 112 line 16.c less lines 3.c , 12.c, and 15.c\nD\nLong-term interest will exclude any short-term interest included in FERC Account 430, Interest on Debt to Associated Companies\nLong Term Debt \n(Note A)\nPreferred Stock \n(112.3.c)\nProprietary \nCapital (112.16.c)\nUndistributed Sub \nEarnings 216.1 \n(112.12.c)\nAccum Other Comp. \nIncome 219 \n(112.15.c)\nLong Term debt balance will reflect the 13 month average of the balances, of which the 1st and 13th are found on page 112, lines 18.c to 21.c, in the Form No. 1; the cost is calculated by \ndividing line 1 by the Long Term Debt balance on line 8."},{"page":76,"startToken":30034,"endToken":30383,"text":"Page 1 of 1\nFor the twelve months ended 12/31/\nAttachment 6\nInterest on True-Up\nDesertLink, LLC\nAppendix III K23\nLine\nRate Year\nRate Year\nProjected Revenue Requirement (Note A)\n1\n                                                                                         -   \nLess\n $                             -   \nEquals\n $                        -   \nNote A - Projected ATRR for the true-up year from Page 1, Line 1 of Projection Appendix III minus Line 6 of Projection Appendix III.\nNote B - Actual Net ATRR for the true-up year from Page 1, Line 9 of True-Up Appendix III.\nInterest Rate on Amount of Refunds or Surcharges\nMonths\nAmortization\n2\n0.000%\nAn over or under collection will be recovered pro rata over year collected, held for one year and returned pro rata over next year\nMonthly\n3\nJanuary\nRate Year\n                                -   \n0.000%\n12\n                          -   \n                              -   \n4\nFebruary\nRate Year\n                                -   \n0.000%\n11\n                          -   \n                              -   \n5\nMarch\nRate Year\n                                -   \n0.000%\n10\n                          -   \n                              -   \n6\nApril\nRate Year\n                                -   \n0.000%\n9\n                          -   \n                              -   \n7\nMay\nRate Year\n                                -   \n0.000%\n8\n                          -   \n                              -   \n8\nJune\nRate Year\n                                -   \n0.000%\n7\n                          -   \n                              -   \n9\nJuly\nRate Year\n                                -   \n0.000%\n6\n                          -   \n                              -   \n10\nAugust\nRate Year\n                                -   \n0.000%\n5\n                          -   \n                              -   \n11\nSeptember\nRate Year\n                                -   \n0.000%\n4\n                          -   \n                              -   \n12\nOctober\nRate Year\n                                -   \n0.000%\n3\n                          -   \n                              -   \n13\nNovember\nRate Year\n                                -   \n0.000%\n2\n                          -   \n                              -   \n14\nDecember\nRate Year\n                                -   \n0.000%\n1\n                          -   \n                              -   \n15\n                          -   \n                              -   \nAnnual\n16\nJanuary through December\nRate Yr. + 1                                 -   \n0.000%\n12\n                          -   \n                              -   \nOver (Under) Recovery Plus Interest Amortized and Recovered Over 12 Months\nMonthly\n17\nJanuary\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n18\nFebruary\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n19\nMarch\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n20\nApril\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n21\nMay\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n22\nJune\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n23\nJuly\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n24\nAugust\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n25\nSeptember\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n26\nOctober\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n27\nNovember\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n28\nDecember\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n29\n                          -   \n30\nTotal Amount of True-Up Adjustment\n $                           -   \n31\nLess Over (Under) Recovery\n $                        -   \n32\nTotal Interest\n $                           -   \nActual Net Revenue \nRequirement (Note B)\nOver (Under) \nRecovery\nOver (Under) \nRecovery Plus \nInterest\nMonthly Interest \nRate on Attachment \n6a\nCalculated \nInterest\nSurcharge (Refund) \nOwed\nCalculation of Interest"},{"page":77,"startToken":30383,"endToken":30545,"text":"Page 1 of 1\nFor the twelve months ended 12/31/\nAttachment 6a\nTrue-Up Interest Rate Calculator\nDesertLink, LLC\nThis Attachment is used to compute the interest rate to be applied to each year's revenue requirement true-up.\nApplicable FERC Interest Rate (Note A):\n1\nRate Year January\n0.00%\n2\nRate Year February\n-\n3\nRate Year March\n-\n4\nRate Year April\n-\n5\nRate Year May\n-\n6\nRate Year June\n-\n7\nRate Year July\n-\n8\nRate Year August\n-\n9\nRate Year September\n-\n10\nRate Year October\n-\n11\nRate Year November\n-\n12\nRate Year December\n-\n13\nRate Year Plus 1  January\n-\n14\nRate Year Plus 1  February\n-\n15\nRate Year Plus 1  March\n-\n16\nRate Year Plus 1  April\n-\n17\nRate Year Plus 1  May\n-\n18\nAverage Rate\n0.00%\n19\nMonthly Average Rate\n0.00%\nNote A - Lines 1-17 are the FERC interest rates under section 35.19a of the regulations for the period shown. Line 18 is the average of lines 1-17."},{"page":78,"startToken":30545,"endToken":30814,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 7\nWeighted Average Federal and State Income Tax Rates\nDesertLink, LLC\nSubchapter C\nMutual\nPensions, IRAs\nUBTI\nNon-Taxpaying\nWeighted \nLine\nDescription\nSource\nCorporations\nIndividuals\nFunds\nKeogh Plans\nEntities\nEntities\nAverage\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n1\nWeighted Marginal Federal Income Tax Rate\nNote A\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n2\nAllocated Income Percentage\nNote B\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n3\nWeighted Average \nLine 1 x Line 2\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n4\nWeighted Average Federal Income Tax Rate \nSum of Line 3, Col. (c)-(h)\n0.00%\n5\nWeighted Marginal State Income Tax Rate\nNote C\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n6\nAllocated Income Percentage\nNote B\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n7\nWeighted Average \nLine 5 x Line 6\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n8\nWeighted Average State Income Tax Rate\nSum of Line 7, Col. (c)-(h)\n0.00%\nA\nFor each Rate Year, DesertLink will develop a schedule calculating the weighted average federal income tax rate for each category of partners. \nB\nThis percentage is developed based on the distributive income allocated to each category of partners rather than their respective ownership percentages.\nC\nFor each Rate Year, DesertLink will develop a schedule calculating the weighted average state income tax rate for each category of partners."},{"page":79,"startToken":30814,"endToken":31398,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 8\nCost of Debt Prior to Issuing Non-Construction Financing\nDesertLink, LLC\nThis Attachment 8 is to be utilized to determine the cost of debt prior to issuing non-construction financing.  Once non-construction financing is issued the cost of debt shall be determined using the methodology described in Note Q on Appendix III.\nIf construction debt has not or will not be issued when construction starts, a proxy rate will be used for the cost of debt, which will be supported in the initial section 205 filing. The proxy rate will be entered on line 36 of this attachment.\nIf construction financing is obtained, all rates, fees and monthly debt balances will be subject to true up pursuant to Attachment 9.\nAny hypothetical amounts in a filed template will be removed and replaced with actual amounts in the first year actual construction loans are borrowed or projected to be borrowed without the need for a section 205 filing to modify the template.\nLine No\n1\nInterest rate on Construction Debt for Rate Year - Line 19 (g)\n0.00%\n2\nRate Year Debt Fee expense - Line 35 (e)\n0.00%\n3\nTotal Cost of Debt - Sum of Lines 1 and 2\n0.0000%\nInterest Rate Information\n4\nCommitment Fee Rate (%)\n5\nProjected Average Drawn Rate for Rate Year (%) - Note A\nMonth During Rate Year\nTotal Loan Amount ($000)\nInterest Expense ($000)\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n6\nDecember Prior Year\n                            -                                         -                                          -                                          -   \n7\nJanuary\n                            -                                         -                                          -                                          -   \n8\nFebruary\n                            -                                         -                                          -                                          -   \n9\nMarch\n                            -                                         -                                          -                                          -   \n10\nApril\n                            -                                         -                                          -                                          -   \n11\nMay\n                            -                                         -                                          -                                          -   \n12\nJune\n                            -                                         -                                          -                                          -   \n13\nJuly\n                            -                                         -                                          -                                          -   \n14\nAugust\n                            -                                         -                                          -                                          -   \n15\nSeptember\n                            -                                         -                                          -                                          -   \n16\nOctober\n                            -                                         -                                          -                                          -   \n17\nNovember\n                            -                                         -                                          -                                          -   \n18\nDecember\n                            -                                         -                                          -                                          -   \n19\nAverage of the 13 Monthly Balances\n                            -   \n                                        -                                          -   \n0.00%\nExample Fee Calculation - All amounts represent actual rate year expenses.\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\nOrigination Fees           \nRate/Fees\nGross Fee Amount ($000)\nYear Fee Incurred\n20\nUnderwriting Discount\n0.00%\n -\n -\n21\nArrangement Fee\n0.00%\n -\n -\n22\nUpfront Fee\n0.00%\n -\n -\n23\nRating Agency Fee\n0.00%\n -\n -\n24\nLegal Fees\n0.00%\n -\n -\n25\nOther\n0.00%\n -\n -\n26\n   Total Issuance Expense / Origination Fees - Sum of Lines 20-25\n -\n -\n -\n -\n27\n28\nAnnual Fees\n29\nAnnual Rating Agency Fee\n0.00%\nN/A\n -\nN/A\nN/A\n30\nAnnual Bank Agency Fee\n0.00%\nN/A                                      -   \nN/A\nN/A\n31\nUtilization Fee\n0.00%\nN/A\n -\nN/A\nN/A\n32\nOther Fees\n0.00%\nN/A\n -\nN/A\nN/A\n33\nTotal Fees\n -\n -\n -\n -\n34\n13 Month Average Debt balance - Line 19 (c)\n                                        -   \n35\nRate Year cost of fees\n0.00%\n36\nProxy Debt rate. Used prior to issuance of construction financing and supported in initial section 205 filing.\n3.2220%\nNotes\nA\nLIBOR\n0.0000%\nSpread\n2.3500%\nTotal\n2.3500%\nIf construction financing has been obtained, the cost of debt prior the issuance of non-construction financing shall be based on the terms of the construction financing and determined below. Up-front fees including origination fees will be amortized and \nincluded in the cost of debt.\nPrincipal Drawn \n($000)\nUnutilized Loan \nBalance ($000)\nCommitment Fee & \nUtilization Fee ($000)\nEffective Annual \nInterest Rate (%)\nFee Amortization Period \n(years)\nRate Year Amortized Fee \nAmount, col. b / col. d\nPrior Years Accumulated \nFee Amortization\nUnamortized Balance \n- End of Rate Year\nProjected rate will be Average LIBOR for rate year + spread. Spread will be supported in initial section 205 filing. LIBOR will be updated based on information in the Wall Street Journal as of the 15th day of the month prior to population of this \ntemplate."},{"page":80,"startToken":31398,"endToken":31754,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 9\nTrue-Up - Construction Financing Cost of Debt\nDesertLink, LLC\nOne time up-front debt fees, including origination fees will be amortized and included in the cost of debt.\nLine No.\n$\n1\nLong Term Interest and Fees (117, sum of 62.c through 67.c) -- Notes A and B\n                                    -   \n2\nLine of Credit Fees (68.c) -- Note C\n                                    -   \n3\nTotal Interest and Fees\n                                    -   \n13 Month Average Long-Term Debt - Notes A and D\nMonth During Rate Year\nLong Term Debt\n(a)\n(d)\n4\nDecember Prior Year\n                                    -   \n5\nJanuary\n                                    -   \n6\nFebruary\n                                    -   \n7\nMarch\n                                    -   \n8\nApril\n                                    -   \n9\nMay\n                                    -   \n10\nJune\n                                    -   \n11\nJuly\n                                    -   \n12\nAugust\n                                    -   \n13\nSeptember\n                                    -   \n14\nOctober\n                                    -   \n15\nNovember\n                                    -   \n16\nDecember\n                                    -   \n17\nAverage of the 13 Monthly Balances\n                                    -   \n18\nTrue-Up Cost of Debt (Line 3 / Line 17)\n0.00%\nNotes\nA\nB\nLong-term interest will exclude any short-term interest included in FERC Account 430, Interest on Debt to Associated Companies.\nC\nLine of credit fees will include only those related to long-term debt and not for short-term debt.\nD\nLong-term debt will exclude any short-term debt included in FERC Account 233, Notes Payable to Associated Companies.\nThis Attachment 9 is to be utilized only in the event construction financing has been obtained to compute the actual cost of debt to be included in the return on rate base calculation for the true-up each year prior to the \nissuance of non-construction financing. Once non-construction financing has been obtained the cost of debt shall be determined using the methodology described in Note Q on Appendix III.\nAny hypothetical amounts in a filed template will be removed and replaced with actual amounts in the first year actual construction loans are borrowed or projected to be borrowed without the need for a section 205 \nfiling to modify the template.\nLong Term debt balance will reflect the 13 month average of the balances, of which the 1st and 13th are found on page 112, line 24, columns d and c, respectively, in the Form No. 1; the cost is calculated by \ndividing line 1 by the Long Term Debt balance on line 8."},{"page":81,"startToken":31754,"endToken":31988,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 10\nDepreciation Rates\nDesertLink, LLC\nTRANSMISSION AND GENERAL PLANT DEPRECIATION RATES\nAnnual Depreciation Rates\nLine No.\n(Note A)\nINTANGIBLE PLANT\n1\n303.1\nContributions in Aid of Construction\nNote B\n2\n303.2\nInterconnections\n2.27% \n3\n303.3\nLicenses\n1.59%\nTRANSMISSION PLANT\n4\n350.2\nLand Rights\n1.43%\n5\n351.1\nComputer Hardware\n20.00%\n6\n352.0\nStructures & Improvements\n1.95%\n7\n353.0\nStation Equipment\n2.58%\n8\n354.0\nTowers & Fixtures\n1.86%\n9\n355.0\nPoles & Fixtures\n2.17%\n10\n356.0\nOverhead Conductors & Devices\n2.01%\n11\n392.0\nTransportation Equipment\n10.00%\n12\n393.0\nStores Equipment\n6.67%\n13\n394.0\nTools, Shop, and Garage Equipment\n12.50%\n14\n397.2\nComputer Software\n11.64%\nNotes\nA\nThese depreciation rates will not be changed absent a FERC order.\nB\nGENERAL PLANT\nIn the event a Contribution in Aid of Construction (CIAC) is made for a transmission facility, the transmission depreciation rates above will be \nweighted based on the relative amount of underlying plant booked to the accounts shown in lines 4-12 above, and the resultant weighted average \ndepreciation rate will be used to amortize the CIAC.   The CIAC depreciation rate for each facility will be determined at the time the plant is \nplaced into service, and will not change  without FERC approval."},{"page":82,"startToken":31988,"endToken":32226,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 11\nPrior Period Adjustments\nDesertLink, LLC\n(a)\n(b)\nCalendar Year\nLine No. Description\nSource\nRevenue Impact of Correction\nRevenue Requirement\n1\nFiling Name and Date\n                                                        -   \n2\nOriginal Revenue Requirement\n                                                              -   \n3\n4\nDescription of Correction 1\n                                                              -   \n5\nDescription of Correction 2\n                                                              -   \n6\n7\nTotal Corrections\nLine 4 + 5\n                                                              -   \n8\n9\nCorrected Revenue Requirement\nLine 2 + 7\n                                                              -   \n10\n11\n12\nTotal Corrections\nLine 7\n                                                              -   \n13\n14\nAverage Monthly FERC Refund Rate\nNote A\n0.00%\n15\nNumber of Months of Interest\nNote B\n30\n16\nInterest on Correction\nLine 12 x 14 x 15\n                                                              -   \n17\n18\nTotal Annual Amount Due from / (to) Customers\nLine 12 + 16\n                                                              -   \nNotes\nA\nB\nThe interest rate on corrections will be the average monthly FERC interest rate for the period from the beginning of the year being corrected through the most recent  month available as of \nthe time the correction is computed and included in an annual filing.\nThe number of months interest due on the correction will be the number of months from the beginning of the year being corrected through June of the year in which the correction will be \nreflected in rates. In this manner the interest computed will reflect all years prior to when the correction is reflected in rates plus interest on the average unrefunded balance of the \ncorrection during the year the correction is reflected in rates."},{"page":83,"startToken":32226,"endToken":32438,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 12\nRevenue Credit Detail\nDesertLink, LLC\n(a)\n(b)\n(c) = (a) - (b)\nLine No.\n(Note A)\nSource\nCompany Total\nLess: Non Transmission\nTransmission-related\n1\nAccount 454 - Rent from Electric Property\n2\nJoint pole attachments - telephone\nCompany books\n                                          -                                                      -                                                                                                                 -   \n3\nJoint pole attachments - cable\nCompany books\n                                          -                                                      -                                                                                                                 -   \n4\nUnderground rentals\nCompany books\n                                          -                                                      -                                                                                                                 -   \n5\nTransmission tower wireless rentals\nCompany books\n                                          -                                                      -                                                                                                                 -   \n6\nOther rentals\nCompany books\n                                          -                                                      -                                                                                                                 -   \n7\nOther rentals\nCompany books\n                                          -                                                      -                                                                                                                 -   \n8\nAccount 454 Revenue Credit\nForm 1 300.19.b\n                                          -                                                      -                                                                                                                 -   \n9\nAccount 456.1 Other Operating Revenues\n10\nCAISO NITS\nCompany books\n                                          -                                                      -                                                                                                                 -   \n11\nCAISO Point to Point\nCompany books\n                                          -                                                      -                                                                                                                 -   \n12\nOver/Under recovery deferral\nCompany books\n                                          -                                                      -                                                                                                                 -   \n13\nOther Transmission Service Revenues\nCompany books\n                                          -                                                      -                                                                                                                 -   \n14\nOther\nCompany books\n                                          -                                                      -                                                                                                                 -   \n15\nTotal Per Books\nForm 1 330.n\n                                          -                                                      -                                                                                                                 -   \n16\nLess: revenues received pursuant to this Formula Rate\n                                          -                                                      -                                                                                                                 -   \n17\nLess: Over/Under recovery deferral\n                                          -                                                      -                                                                                                                 -   \n17a\nLess: Revenue Credits included in the TRBAA\n                                          -                                                      -                                                                                                                 -   \n18\nAccount 456.1 Revenue Credit\n                                          -                                                      -                                                                                                                 -   \n19\nTotal Revenue Credits\n(Line 8 + line 18)\n                                          -                                                      -                                                                                                                 -   \nNote A\nAll 454 and 456.1 revenues will be detailed from Company books and records or FERC Form 1, and additional rows added if necessary.  Non-transmission-related amounts will be deducted to determine transmission-related amounts.\n(Line 15 - line 16 - line 17 \n- line 17a)"},{"page":84,"startToken":32438,"endToken":32860,"text":"DesertLink, LLC\nAttachment 13 - Excess or Deficient Accumulated Deferred Income Taxes - Summary\n[Year] \n[Projected or Actual]\nLine No. \n1\n2\n[List of tax law changes, accounting treatment, and asscociated explanatory notes.]\n3\nRate Base Adjustment Mechanism - Summary\n4\nAccount\nAmount\nReferences\n5\n182.3 (debit or <credit>)\n                        -   \n6\n254 (debit or <credit>)\n                        -   \n7\nTotal Deficient or (Excess) ADIT (sum of lines 5-6)\n                        -   To Appendix III, Page 2, Line 22a, Col. (3)\n8\n9\nIncome Tax Allowance Adjustment Mechanism - Summary\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n10\n11\n[Insert rows as necessary]\n                        -   \n                        -   \n11a\n[Insert rows as necessary]\n                        -   \n                        -   \n11…\n[Insert rows as necessary]\n                        -   \n                        -   \n12\nTotal\n(sum of lines 11_)\n                        -   \n                        -   \n13\n14\n[Explanatory statements as needed]  \nThe primary purposes of this worksheet are to: \n - reconcile the amounts of regulatory assets and liabilities comprising the rate base adjustment mechanism on Appendix III, Page 2, Line 22a (ADJUSTMENTS TO RATE BASE > Deficient or (Excess) ADIT) as of the beginning and end of the current test \nperiod (summarized beginning at Line 3 below) and \n- to support the amount of excess deferred tax expense or benefit recognized due to enacted change(s) in tax rate(s) on Appendix III, Page 3, Line 40 (INCOME TAXES > Deficient or (Excess) Deferred Income Taxes) and the effect of such excess deferred \ntax expense or benefit on the revenue requirement as reflected in the income tax allowance adjustment mechanism on Appendix III, Page 3, Line 44 (INCOME TAXES > Deficient or (Excess) Deferred Income Tax Adjustment) during the test period \n(summarized beginning on Line 9 below).  \nThis worksheet supports the computation of the projected revenue requirement or, as appropriate, the actual revenue requirement used to compute the true-up adjustment.\nEach tax law change addressed by this worksheet with its associated explanatory note is listed below.  Amounts related to each tax law change are provided and supported throughout this worksheet.  Additional lines and explanatory notes will be added to \nthis worksheet as necessary as tax law changes are enacted without the need for an FPA Section 205 filing. \nThe amounts summarized above are computed in the Rate Base Adjustment Mechanism-Reconciliation of Beginning and End of Test Period Balances section of the worksheet with proration and averaging of activity during the test period computed in \ndifferent section of Attachment 13.1 for projected revenue requirement calculations and actual revenue requirement calculations.\n Amortization or \nMitigation of \nDeficient or \n<Excess> ADIT \n Tax Gross-up \nFactor \n Amortization or \nMitigation with \nTax Gross-up \n To Appendix III, \nPage 3, Line 40, \nCol. (3) \n To Appendix III, \nPage 3, Line 44, \nCol. (3)"},{"page":85,"startToken":32860,"endToken":33358,"text":"15\nRate Base Adjustment Mechanism - Reconciliation of Beginning and End of Test Period Balances\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n(j)\n16\nDescription (+ = debit, <> = credit)\nAmortization period and method\n17\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n17a\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n17b\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n17...\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n18\nTotal for account 182.3\n(sum of lines 17_)\n                        -                           -                           -                           -                           -   \n19\n FN1. pg 232 \n FN1. pg 232 \n20\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n20a\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n20b\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n20...\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n21\nTotal for account 254\n(sum of lines 20_)\n                        -                           -                           -                           -                           -   \n22\n FN1. pg 278 \n FN1. pg 278 \n23\n24\nIncome Tax Allowance Adjustment Mechanism\n25\n26\nAmortization of Excess or Deficient ADIT\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n(j)\n27\nDescription (+ = debit, <> = credit)\nComments\n28\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n28a\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n28b\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n28...\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n29\nTotal for account 182.3\n(sum of lines 28_)\n                        -                           -                           -                           -                            -   \n30\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n30a\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n30b\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n30...\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n31\nTotal for account 254 \n(sum of lines 30_)\n                        -                           -                           -                           -                            -   \n32\nTotal amortization and offsetting entries\n(sum of lines 29 & 31)                         -                           -                           -                           -                            -   \n33\nNet income tax expense or benefit\n(sum of lines 32(f) & 32(g))\n                        -   \n To line 11 \nBalance at \nBeginning of \nYear\nRe-\nmeasurement of \nADIT\nAnnual \nAmortization \n(Note 4)\nOther \nAdjustments\n(Note 5)\nBalance at End \nof Year \n(d)+(e)+(f)+\n(g)\nWhether subject \nto normalization \nrules\n(Note 6)\nAnalysis - Balances of tax-related regulatory assets and liabilities include tax gross-up.  Accordingly, for the regulatory assets and liabilities for deficient or excess deferred taxes included in rate base, the related deferred tax assets and liabilities are also \nincluded in rate base.  Remeasurements in column (e) are described in Notes 2 and 3 and are based on the journal entry below and the support on the worksheet for the applicable tax law change.  Averaging or proration of amounts affecting rate base is \ncomputed on different sections of Attachment 13.1 for projected revenue requirement and actual revenue requirement. \nThe income tax allowance adjustment mechanism may include amortization of excess or deficient ADIT pertaining to deferred tax expense or benefit reflected in rates at a historical tax rate when the underlying timing difference(s) originated (computed \nunder Amortization of Excess or Deficient ADIT within the Income Tax Allowance Adjustment Mechanism section of this worksheet) as well as an adjustment for tax law changes with prospective effective dates intended to mitigate the over- or under-\nrecovery of deferred income taxes originating prior to the effective date of such tax law changes (computed under Adjustment for Tax Law Changes with Prospective Effective Dates within the Income Tax Allowance Adjustment Mechanism section of this \nworksheet).\nAnnual \nAmortization \nfrom Table \nAbove\n(Note 4)\nDebit or \n<Credit> to \nAccount 410.1\nDebit or \n<Credit> to \nAccount 411.1\nDebit or \n<Credit> to \nAccount 190\nDebit or \n<Credit> to \nAccount 283"},{"page":86,"startToken":33358,"endToken":33931,"text":"34\nAdjustment for Tax Law Changes with Prospective Effective Dates\n35\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n(j)\n(k)\n36\n37\n (c) x (d) \n1 / (1- (d))\n (e) x (f) \n - [(c) x (h)] \n (e) + (i) \n (j) x (f) \n38\n[Insert rows as necessary]\n                        -   \n                        -   \n                         -                           -                           -   \n To line 11 \n38…\n[Insert rows as necessary]\n                        -   \n                        -   \n                         -                           -                           -   \n To line 11 \n39\nNote 1 - Summary of re-measurement of ADIT resulting from tax law changes\n40\n41\nNote 1a - Summary of re-measurement of ADIT resulting from \n[name of tax law change]\nAdditional information is provided in Note \n42\nRe-measurement entry \n(a)\n(b)\n(c) \n43\nAccount\nComments or References\n44\n190\n45\n281\n46\n282\n47\n283\n48\n182.3 (tax-related, included in rate base - protected)\n49\n182.3 (tax-related, included in rate base - unprotected)\n50\n182.3 (tax-related, not in rate base))\n51\n190 (related to portion of acct. 182.3 not in rate base)\n52\n254 (tax-related, included in rate base - protected)\n53\n254 (tax-related, included in rate base - unprotected)\n54\n254 (tax-related, not in rate base)\n55\n283 (related to portion of acct. 254 not in rate base)\n56\nAccount 410.1\n57\nAccount 411.1\n58\nAccount 410.2\n59\nAccount 411.2\n60\nTotal\n (sum of lines \n                        -   \n61\n[Insert additional analysis.]\nIn the case of tax law changes with an effective date(s) after the beginning of the test period, the impact of a timing difference on current tax expense or benefit differs from the impact on ADIT.  For example, in the case \nof a deductible timing difference originating in a tax year with a higher enacted tax rate than will apply when the difference will reverse, the current tax benefit will exceed the deferred tax expense.  In this situation, the \nadjustment computed below to recoverable income tax expense is made in order to avoid over-recovering income tax expense in the current test period due to the excess of current tax benefit over deferred tax expense \n(computed based on the estimated amount of the future tax liability) with respect to a given timing difference.  The adjustment to recoverable tax expense during the test period in which a timing difference originates \nmitigates the need for refund of a regulatory liability for excess deferred taxes in a future period (or, as applicable, the need for recovery of a regulatory asset for deficient deferred taxes in a future period).  Amounts in \ncolumn (i) are reported in the Income Tax Allowance Adjustment Mechanism - Summary on this worksheet.\n Originating \nTaxable or \n(Deductible) \nBook / Tax \nDifference for \nTest Year \n Tax Rate for \nTest Year \n Current Tax \nExpense or \n(Benefit) in Test \nYear \n Tax Gross-up \nFactor for Test \nYear \n Revemue \nRequirement \nImapct for Test \nYear \n Enacted Tax \nRate for the \nReversal Year(s) \n Deferred Tax \nExpense or \n(Benefit) in Test \nYear \n Total Tax \nExpense or \n(Benefit) in Test \nYear \n Adjustment to \nMitigate \nOver/under-\nrecovery of \nDeferred Taxes  \nThe purposes of this portion of the worksheet are, for each change in tax law, to explain: \n- how any ADIT accounts were re-measured, \n- the excess or deficient ADIT contained therein, and \n- the accounting for any excess or deficient amounts in Accounts 182.3 (Other Regulatory Assets) and 254 (Other Regulatory Liabilities).\nNote 2 describes how ADIT accounts are re-measured upon a change in income tax law.  A separate summary (i.e., Note 1a, Note 1b, etc.) will be added for each tax law change resulting in a re-measurement of ADIT.\nDebit or \n<Credit>"},{"page":87,"startToken":33931,"endToken":34481,"text":"62\nNote 1b - Summary of \n[name of tax law change]\nAdditional information is provided in Note \n63\n[Insert additional analysis.]\n64\nNote 1b - Summary of \n[name of tax law change]\nAdditional information is provided in Note \n65\n66\n67\n68\n69\n[Continuation of note with respect to particular changes in tax law.]\n70\n[Insert additional notes as needed.]\nNote 2 - Explanation of how ADIT accounts are re-measured upon a change in income tax law\nDeferred tax assets and liabilities are adjusted (re-measured) for the effect of the changes in tax law (including tax rates) in the period that the change is enacted.  Adjustments are recorded in the appropriate deferred tax \nbalance sheet accounts (Accounts 190, 281, 282 and 283) based on the nature of the temporary difference and the related classification requirements of the accounts.   If as a result of action or expected action by a \nregulator, it is probable that the future increase or decrease in taxes payable due to the change in tax law or rates will be recovered from or returned to customers through future rates, a regulatory asset or liability is \nrecognized in Account 182.3 (Other Regulatory Assets), or Account 254 (Other Regulatory Liabilities), as appropriate, for that probable future revenue or reduction in future revenue.  Re-measurements of deferred tax \nbalance sheet accounts may also result in re-measurements of tax-related regulatory assets or liabilities that had been recorded prior to the change in tax law.  If it is not probable that the future increase or decrease in taxes \npayable due to the change in tax law or rates will be recovered from or returned to customers through future rates, tax expense is recognized in Account 410.2 (Provision for Deferred Income Taxes, Other Income or \nDeductions) or tax benefit is recognized in Account 411.2 (Provision for Deferred Income Taxes-Credit, Other Income or Deductions), as appropriate.  \nNote 3 - [Complete to support information above.]\nNote 4 - The amortization of the deficient or excess ADIT reducing Account 254 (Other Regulatory Liabilities) is recorded with credits to Account 411.1 (Provision for Deferred Income Taxes – Credit, Utility Operating \nIncome) and to Account 190 (Accumulated Deferred Income Taxes) or Account 283 (Accumulated Deferred Income Taxes—Other), as appropriate, in accordance with the Commission’s Accounting for Income Taxes \nGuidance.  The amortization of the deficient or excess ADIT reducing Account 182.3 (Other Regulatory Assets) is recorded with debits to Account 410.1 (Provision for Deferred Income Taxes, Utility Operating Income) \nand to Account 190 (Accumulated Deferred Income Taxes) or Account 283 (Accumulated Deferred Income Taxes—Other), as appropriate, in accordance with the Commission’s Accounting for Income Taxes Guidance.  \nThis activity is summarized in the table \"Income Tax Allowance Mechanism - Projected\" or the table \"Income Tax Allowance Mechanism - Actual,\" as appropriate.  The annual amortization in the tables above reflects tax \ngross-up and is stated at the revenue requirement level. \nNote 5 - [Complete to support information above.]\nNote 6 -  The worksheet indicates whether each excess or deficient ADIT amounts are protected (i.e., subject to normalization rules of a taxing jurisdiction) or unprotected (i.e., not subject to normalization rules of a taxing \njurisdiction).  To the extent that normalization requirements apply to ADIT remeasurements, additional computations (e.g., proration of excess deferred tax activity related to future test periods) may be necessary."},{"page":88,"startToken":34481,"endToken":34870,"text":"DesertLink, LLC\nAttachment 13.1 - Regulatory Assets/Liabilities for Deficient/Excess ADIT - Averaging and Proration Adjustments \nSupport for Attachment 13 (Excess or Deficient Accumulated Deferred Income Taxes - Summary)\n[Year] \n[Projected or Actual]\nLine No.\n1\nRate year =\n2\nTest period days after rates become effective\n3\n4\nAccount 182.3 - Other Regulatory Assets (portion related to deficient or excess ADIT)\n5\n6\nBeginning balance  (debit or <credit>)\n                        -   \n7\nLess:  Portion not related to transmission\n                        -   \n8\nLess:  Portion not reflected in rate base\n                        -   \n9\nSubtotal:  Portion reflected in rate base\n                        -   \n10\nLess:  Portion subject to proration\n                        -   \n11\nPortion subject to averaging  (debit or <credit>)\n                        -   \n12\nEnding balance  (debit or <credit>)\n                        -   \n13\nLess:  Portion not related to transmission\n                        -   \n14\nLess:  Portion not reflected in rate base\n                        -   \n15\nSubtotal:  Portion reflected in rate base\n                        -   \n16\nLess:  Portion subject to proration (before proration)\n                        -   \n17\nPortion subject to averaging (before averaging)  (debit or <credit>)\n                        -   \n18\nEnding balance of portion subject to proration (prorated)  (debit or <credit>)\n                        -   From Line 36(n)\n19\nAverage balance of portion subject to averaging\n                        -   \n20\nAmount reflected in rate base  (debit or <credit>)\n                        -   To Att. 13, Line 5\nThis attachment includes sections that are populated only with actual data and thus, these sections remain blank when the formula rate template is \ncalculating a projected revenue requirement. Columns (i) through (n) below are not used for the projection and are only populated with actual data for the \nAnnual Update.   \nNote 1 - The computations below apply the proration rules of Treasury Regulation section 1.167(l)-1(h)(6) to the annual activity of the portions of the \ndeficient or excess accumulated deferred income taxes recorded in account 182.3 or 254 that are subject to the normalization requirements.  Activity \nrelated to the portions of the account balances reflected in rate base but not subject to the proration requirement is averaged instead of prorated.  The \nbalances below include tax gross-up.  The corresponding portions of the deferred tax asset related to the portions of the regulatory liability and the \ncorresponding portions of the deferred tax liability related to the portions of the regulatory asset are also reflected in rate base and prorated or averaged, \nas appropriate.  Columns (a) through (h) are used for projected and actual revenue requirements computations.  Columns (i) through (n) are used for \nactual revenue requirement computations.   \nAmount\ndebit / <credit>"},{"page":89,"startToken":34870,"endToken":35268,"text":"21\nAccount 182.3 - Other Regulatory Assets (portion related to deficient or excess ADIT)\nColumns (i) through (n) are not used for the calculation of the projected revenue requirement\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n(j)\n(k)\n(l)\n(m)\n(n)\n22\nMonth\nYear\n23\n \nprior month (d) + (c)\nLine 2\n[(c) x (e) / (f)]\nprior month (h) + (g)\n[Note 5]\n[Note 6]\n[Note 7]\n24\nDecember 31,\n-\n NA                               -   \nNA\n0\n NA                               -   \n NA \n NA \n NA \n NA \n NA                              -   \n25\nJanuary \n-\n                              -                                 -   \n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n26\nFebruary\n-\n                              -                                 -   \n307\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n27\nMarch \n-\n                              -                                 -   \n276\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n28\nApril\n-\n                              -                                 -   \n246\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n29\nMay\n-\n                              -                                 -   \n215\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n30\nJune\n-\n                              -                                 -   \n185\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n31\nJuly\n-\n                              -                                 -   \n154\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n32\nAugust \n-\n                              -                                 -   \n123\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n33\nSeptember\n-\n                              -                                 -   \n93\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n34\nOctober\n-\n                              -                                 -   \n62\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n35\nNovember\n-\n                              -                                 -   \n32\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n36\nDecember\n-\n                              -                                 -   \n1\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n37\nTotal \n                              -   \n                             -                                -   \n38\n39\nAccount 254 - Other Regulatory Liabilities (portion related to deficient or excess ADIT)\n40\n41\nBeginning balance  (debit or <credit>)\n                        -   \n42\nLess:  Portion not related to transmission\n                        -   \n43\nLess:  Portion not reflected in rate base\n                        -   \n44\nSubtotal:  Portion reflected in rate base\n                        -   \n45\nLess:  Portion subject to proration\n                        -   \n46\nPortion subject to averaging  (debit or <credit>)\n                        -   \n47\nEnding balance  (debit or <credit>)\n                        -   \n48\nLess:  Portion not related to transmission\n                        -   \n49\nLess:  Portion not reflected in rate base\n                        -   \n50\nSubtotal:  Portion reflected in rate base\n                        -   \n51\nLess:  Portion subject to proration (before proration)\n                        -   \n52\nPortion subject to averaging (before averaging)  (debit or <credit>)\n                        -   \n53\nEnding balance of portion subject to proration (prorated)  (debit or <credit>)\n                        -   From Line 70(n)\n54\nAverage balance of portion subject to averaging\n                        -   \n55\nAmount reflected in rate base  (debit or <credit>)\n                        -   To Att. 13, Line 6\nForecasted Monthly \nActivity\ndebit / <credit>\nForecasted \nMonth-end Balance\ndebit / <credit>\nDays until \nEnd of Test \nPeriod\nDays in Test \nPeriod\nProrated Forecasted \nMonthly Activity\ndebit / <credit>\nForecasted  Prorated \nMonth-end Balance\ndebit / <credit>\nActual Monthly \nActivity\nDifference between \nprojected monthly \nand actual monthly \nactivity.\nPreserve projected \nproration when actual \nmonthly and projected \nmonthly activity are \neither both increases \nor decreases.  \nFifty percent of the \ndifference between \nprojected and actual \nactivity when actual \nand projected activity \nare either both \nincreases or \ndecreases.  \nFifty percent of actual \nmonthly activity when \nprojected activity is \nan increase while \nactual activity is a \ndecrease OR projected \nactivity is a decrease \nwhile actual activity is \nan increase.\nBalance reflecting \nproration or \naveraging \n(i) - (c) \n [Note 4]\n(k) + (l) + (m) \n[Note 8]\nNote 2 - \nAmount\ndebit / <credit>"},{"page":90,"startToken":35268,"endToken":35944,"text":"56\nAccount 254 - Other Regulatory Liabilities (portion related to deficient or excess ADIT)\nColumns (i) through (n) are not used for the calculation of the projected revenue requirement\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n(j)\n(k)\n(l)\n(m)\n(n)\n57\nMonth\nYear\n58\n \nprior month (d) + (c)\nLine 2\n[(c) x (e) / (f)]\nprior month (h) + (g)\n[Note 5]\n[Note 6]\n[Note 7]\n58\nDecember 31,\n-\n NA                               -   \nNA\n0\n NA                               -   \n NA \n NA \n NA \n NA                              -   \n59\nJanuary \n-\n                              -                                 -   \n0\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n60\nFebruary\n-\n                              -                                 -   \n307\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n61\nMarch \n-\n                              -                                 -   \n276\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n62\nApril\n-\n                              -                                 -   \n246\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n63\nMay\n-\n                              -                                 -   \n215\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n64\nJune\n-\n                              -                                 -   \n185\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n65\nJuly\n-\n                              -                                 -   \n154\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n66\nAugust \n-\n                              -                                 -   \n123\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n67\nSeptember\n-\n                              -                                 -   \n93\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n68\nOctober\n-\n                              -                                 -   \n62\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n69\nNovember\n-\n                              -                                 -   \n32\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n70\nDecember\n-\n                              -                                 -   \n1\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n71\nTotal \n                              -   \n                             -                                -   \n72\n73\n74\n75\n76\n77\nForecasted Monthly \nActivity\ndebit / <credit>\nForecasted \nMonth-end Balance\ndebit / <credit>\nDays until \nEnd of Test \nPeriod\nDays in Test \nPeriod\nProrated Forecasted \nMonthly Activity\ndebit / <credit>\nForecasted  Prorated \nMonth-end Balance\ndebit / <credit>\nActual Monthly \nActivity\nDifference between \nprojected monthly \nand actual monthly \nactivity.\nPreserve projected \nproration when actual \nmonthly and projected \nmonthly activity are \neither both increases \nor decreases.  \nFifty percent of the \ndifference between \nprojected and actual \nactivity when actual \nand projected activity \nare either both \nincreases or \ndecreases.  \nFifty percent of actual \nmonthly activity when \nprojected activity is \nan increase while \nactual activity is a \ndecrease OR projected \nactivity is a decrease \nwhile actual activity is \nan increase.\nBalance reflecting \nproration or \naveraging \n(i) - (c) \n [Note 4]\n(k) + (l) + (m) \n[Note 8]\nNote 3 - \nNote 4  -  Column J is the difference between actual monthly and projected monthly activity (Column I minus Column C).  Specifically, if projected and \nactual activity are both positive, a negative in Column J represents over-projection (i.e., the amount of projected activity that did not occur) and a \npositive in Column J represents under-projection (i.e., the excess of actual activity over projected activity). If projected and actual activity are both \nnegative, a negative in Column J represents under-projection (i.e., the excess of actual activity over projected activity) and a positive in Column J \nrepresents over-projection (i.e., the amount of projected activity that did not occur). \nNote 5  -  Column K preserves the effects of excess ADIT proration from the projected revenue requirement when actual monthly excess ADIT activity \nand projected monthly excess ADIT activity are either both increases or decreases.  Specifically, if Column J indicates that excess ADIT activity was \nover-projected, enter Column G x [Column I / Column C].  If Column J indicates that excess ADIT activity was under-projected, enter the amount from \nColumn G and complete Column L).  In other situations, enter zero.\nNote 6  -  Column L applies when (1) Column J indicates that excess ADIT activity was under-projected AND (2) actual monthly and projected monthly \nactivity are either both increases or both decreases.  Enter 50 percent of the amount from Column J.  In other situations, enter zero.  The excess ADIT \nactivity in column L is multiplied by 50 percent to reflect averaging of rate base to the extent that the proration requirement has not been applied to a \nportion of the monthly excess ADIT activity.\nNote 7  -  Column M applies when (1) projected monthly activity was an increase while actual monthly activity was a decrease OR (2) projected monthly \nactivity was a decrease while actual monthly activity was an increase.  Enter 50 percent of the amount of actual monthly activity (Column I).  In other \nsituations, enter zero.  The excess ADIT activity in column M is multiplied by 50 percent to reflect averaging of rate base to the extent that the proration \nrequirement has not been applied to a portion of the monthly excess ADIT activity.\nNote 8  -  Column N is computed by adding the balance at the end of the prior month to EITHER (1) the sum of prorated monthly excess ADIT activity, \nif any, from Column K and the portion of monthly excess ADIT activity, if any, from Column L OR (2) the portion of monthly excess ADIT activity in \nColumn M."},{"page":91,"startToken":35944,"endToken":36447,"text":"DesertLink, LLC\nAttachment 13.2 - Re-measurement of ADIT and Tax-related Regulatory Assets and Liabilities Resulting from the Tax Change Identified in Line 1\nSupport for Attachment 13 (Excess or Deficient Accumulated Deferred Income Taxes - Summary)\n[Year] \n[Projected or Actual]\nLine No.\n1\n[Identify/describe the tax legislation/change]\n2\n[Describe the computation.]\n3\n4\n(a)\n(b)\n(c) \n(d)\n(e) \n(f)\n(g)\n(h)\n(i)\n(j)\n(k)\n(l)\n(m)\n(n)\n5\nBalances and rates prior to remeasurement\n[tax rate]\n[tax rate]\n[tax rate]\n[1/(1-tax rate)]\n[tax rate]\n6\nTemporary Difference\nAccount\nAccount\nAccount\nAccount\nAccount\n7\nItem\nNormalized?\nAmount\n190\n282\n283\n182.3\n283\n8\n[Insert rows as necessary]\n8a\n[Insert rows as necessary]\n8b\n[Insert rows as necessary]\n8...\n[Insert rows as necessary]\n9\nTotal\n                     -                      -                      -                      -                      - \n10\nRemeasured balances and rates\nOther accounts affected by remeasurement\n11\n[tax rate]\n[tax rate]\n[tax rate]\n[1/(1-tax rate)]\n[tax rate]\n[1/(1-tax rate [tax rate] /(1-tax rate [tax rate]\n12\nTemporary Difference\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\n13\nItem\nNormalized?\nAmount\n190\n282\n283\n182.3\n283\n410.2\n411.2\n254\n190\n182.3\n283\n14\n[Insert rows as necessary]\n14a\n[Insert rows as necessary]\n14b\n[Insert rows as necessary]\n14...\n[Insert rows as necessary]\n15\nTotal\n                     -                      -                      -                      -                      - \n              -               -               -               -               -               - \n16\nRemeasurement journal entry:  debt or <credit> (to Attachment 13)\n                     -                      -                      -                      -                      - \n              -               -               -               -               -               - \n17\nSummary of Effects on Tax-related Regulatory Assets and Liabilities\n18\nAccount 182.3 - included in rate base, subject to normalization rules\n19\nAccount 182.3 - included in rate base, not subject to normalization rules\n20\nAccount 182.3 - not included in rate base\n21\nAccount 254 - included in rate base, subject to normalization rules\n22\nAccount 254 - included in rate base, not subject to normalization rules\n23\nAccount 254 - not included in rate base\nThe ratemaking treatment of each item in terms of whether it is subject to the normalization requirements (i.e., P or \"protected\") or not subject to the normalization requirements (i.e., U or \"unprotected\") \nand included in rate base or not (i.e., RB or non-RB) is indicated in column (b).  The balances are measured at the composite tax rate in effect immediately before effective date of the change in tax law and \nremeasured immediately after the change in tax law.  Each set of balances includes the appropriate income tax rates and tax gross-up factors (as computed in the specific note for this tax law change in Att. \n13).  The journal entry to record the remeasurements (Line 16) is based on the differences in balances of accounts recorded prior to the change in law (columns (d)-(h)) and activity in other accounts \nresulting from the remeasurement (columns (i)-(n)).  The remeasurement entry is also included in Att. 13.  The accounting is further described in Att. 13, Note 2. \nThis worksheet will be included in support of the revenue requirement computation until the excess or deficient ADIT is fully amortized.  A similar worksheet will be used for subsequent changes in tax \nlaw resulting in re-measurement of ADIT."},{"page":92,"startToken":36447,"endToken":36456,"text":"Appendix V  PRO FORMA LARGE LOAD COST RECOVERY AGREEMENT"},{"page":93,"startToken":36456,"endToken":36814,"text":"1 \n \nDESERTLINK, LLC \n[PRO FORMA] LARGE LOAD COST RECOVERY AGREEMENT  \n \nThis Large Load Cost Recovery Agreement (this “Agreement”) is entered into as of this __ day \nof _______ 20  , by and between [________], a [●] and an Eligible Customer under the CAISO \nTariff (“Eligible Customer”), and DesertLink, LLC, a Delaware limited liability company \n(“DesertLink” or “Transmission Owner”). DesertLink and Eligible Customer are referred to \ncollectively as the “Parties” and individually as a “Party.”  \n[_______], a [●] (“Large Load Customer”), executes the Limited Acknowledgment set forth \nbelow solely for the purposes stated therein and is not a Party to the wholesale payment \nobligations established by this Agreement.  \n \nRECITALS \n \nWHEREAS, DesertLink is a transmission-only company established to develop, own, \nand operate transmission facilities (“Transmission Facilities”) pursuant to the provisions of its \nTransmission Owner Tariff (“TO Tariff”) and the California Independent System Operator \nCorporation (“CAISO”) Open Access Transmission Tariff (“CAISO Tariff”); \nWHEREAS, Eligible Customer is eligible to take transmission service under the CAISO \nTariff and does or will take such service on behalf of the Large Load Customer, whether or not \nEligible Customer owns or operates an electric distribution system; \nWHEREAS, Eligible Customer and Transmission Owner are parties to, or are entering \ninto, an Eligible Customer for Large Load (“ECLL”) Interconnection Agreement or \nTransmission System Wholesale Load (“TSWL”) Interconnection Agreement (each, an \n“Interconnection Agreement”) concerning the Large Load Facility; \nWHEREAS, Large Load Customer owns, operates, or proposes to develop the Large \nLoad Facility identified in Schedule 1; \nWHEREAS, the Eligible Customer has submitted an ECLL Interconnection Application \nor TSWL Interconnection Application for the interconnection of the Large Load Facility as a \nnew or incremental load; \nWHEREAS, Eligible Customer intends to procure transmission service pursuant to the \nCAISO Tariff and its associated schedules on behalf of Large Load Customer; \nWHEREAS, in connection with the Large Load Facility, Transmission Owner must \nmake additions and/or modifications to its transmission system, including the Large Load-Driven \nUpgrades identified in Schedule 1; \n \nWHEREAS, CAISO may, under the CAISO Tariff or a Commission-accepted \nmethodology, formally assign to the Large Load Facility a specific share of the costs or revenue \nrequirement of a regional transmission project, and the Parties intend this Agreement to address"},{"page":94,"startToken":36814,"endToken":37221,"text":"2 \n \nthat assigned share without changing any allocation otherwise established under the CAISO \nTariff; \nWHEREAS, the applicable studies may identify impacts on transmission systems other \nthan DesertLink’s transmission system and may identify Affected System Upgrades necessary to \naccommodate or mitigate such impacts; \n \nWHEREAS, Eligible Customer is responsible for entering into and maintaining the \narrangements, payment obligations, and financial security or credit support required by each \napplicable Affected System Owner to ensure that costs and financial risks associated with \nAffected System Upgrades are not shifted to customers that did not cause those costs; \nWHEREAS, Transmission Owner, Eligible Customer, and Distribution Utility have \nexecuted or expect to execute an engineering and procurement agreement and/or an \nInterconnection Agreement governing the design, construction, and interconnection of the \nTransmission Owner’s facilities to the Distribution Utility’s facilities, including the Network \nUpgrades, required to support service of the Large Load Facility; \nWHEREAS, the Parties enter into this Agreement to establish the Eligible Customer’s \nwholesale revenue-support and security obligations associated with the Large Load Facility and \nthe Large Load-Driven Upgrades, without establishing or prescribing the retail rates, charges, or \nrecovery arrangements between Eligible Customer and Large Load Customer; \nWHEREAS, the Commission has recognized that the framework under which CAISO \nprovides transmission service is unique and that certain responsibilities fall to the Participating \nTransmission Owners, Cal. Indep. Sys. Operator Corp., 195 FERC ¶ 61,214, at P 37 (2026), and \nthis Agreement is the form of agreement established under Sections 10.9 and 10A.6 of the TO \nTariff to secure Eligible Customer’s minimum contribution toward Transmission Owner’s \ntransmission revenue requirement; \nWHEREAS, CAISO is not a party to this Agreement; this Agreement does not create \nany obligation of CAISO, including any obligation to provide settlement, metering, billing, \nresettlement, or allocation data, which arises, if at all, under the CAISO Requirements; and \nDesertLink shall recover the costs of the Covered Upgrades through its Formula Rate and shall \nflow TRBAA Credits, including any adjustment resulting from the resolution of a dispute under \nthis Agreement, through to transmission customers through its TRBAA; \nNOW, THEREFORE, in consideration of the mutual promises and covenants set forth \nherein, and for other good and valuable consideration, the receipt and sufficiency of which are \nhereby acknowledged, the Parties intending to be legally bound, agree as follows:  \n1. Recitals. The statements set forth in the recitals above are hereby incorporated herein into \nthe terms and conditions of this Agreement as if fully set forth herein."},{"page":95,"startToken":37221,"endToken":37621,"text":"3 \n \n2. Definitions \nCapitalized terms not defined herein have the meanings given in the CAISO Tariff, the \nDesertLink TO Tariff Formula Rate Implementation Protocols in Appendix IV of the TO \nTariff (“Protocols”), or the relevant Interconnection Agreement. \n2.1. \n“Affected System” means an electric transmission system, other than DesertLink’s \ntransmission system, that an applicable study determines may be materially affected \nby the interconnection or service of the Large Load Facility, including the \ntransmission system of another Participating TO or a transmission system outside the \nCAISO Controlled Grid. \n2.2. \n“Affected System Arrangement” means an executed agreement or other binding \narrangement entered into by Eligible Customer with an Affected System Owner that \nestablishes the applicable study, engineering, design, procurement, construction, \nownership, cost responsibility, cancellation-cost, revenue-support, payment, financial \nsecurity or credit support, true-up, and other obligations associated with an Affected \nSystem Upgrade. \n2.3. \n“Affected System Owner” means the owner or operator responsible for an Affected \nSystem. \n2.4. \n“Affected System Upgrade” means an addition, modification, or upgrade to an \nAffected System that an applicable study determines is necessary to accommodate or \nmitigate an impact caused, in whole or in part, by the interconnection or service of the \nLarge Load Facility. \n2.5. \n“Annual MTRC” means the annual Minimum Transmission Revenue Contribution \nfor a Covered Upgrade, calculated solely under the MTRC Calculation Template in \nSchedule 5. Before the Final MTRC Determination Date for a Covered Upgrade, the \nAnnual MTRC is the Estimated Annual MTRC. On and after that date, it is the Final \nAnnual MTRC fixed under Section 6.3. Each Annual MTRC is levelized over a twenty \n(20)-year MTRC Term beginning on the applicable Upgrade In-Service Date or \nRegional Project In-Service Date, as applicable. The Annual MTRC is not an input to, \nor calculation made under, DesertLink’s annual Formula Rate update. \n2.6. \n“Annual Termination Fee Credit” means the annual amount of a Termination Fee \nBalance included in the TRBAA under Section 3.3.4. \n2.7. \n“Applicable Allocation Percentage” has the meaning set forth in Section 6.3.3. \n2.8. \n“Applicable Laws and Regulations” means all duly promulgated applicable federal, \nstate, and local laws, regulations, rules, ordinances, codes, decrees, judgments, \ndirectives, judicial or administrative orders, permits, and other duly authorized actions \nof any Governmental Authority. \n2.9. \n“Applied Security Proceeds” means proceeds of Operational Security that \nTransmission Owner has applied under Section 7.6 to an identified Supplemental"},{"page":96,"startToken":37621,"endToken":38044,"text":"4 \n \nMTRC, prior-period true-up adjustment, Termination Fee, or other payment obligation \narising under Article 6 or Section 3.3.4. Proceeds of Construction Security applied to \nPre-In-Service Termination Costs or other construction-related obligations are not \nApplied Security Proceeds and shall be treated as provided in Sections 3.3.2 and 3.3.3. \n2.10. “ARR” means annual revenue requirement. \n2.11. “Break-Even” has the meaning set forth in Section 6.7. \n2.12. “Business Day” means a Business Day as defined in Appendix A to the CAISO Tariff, \nas amended from time to time. \n2.13. “CAISO-Assigned Regional Project” means a regional transmission project \napproved or designated through a CAISO Tariff process for which CAISO, under the \nCAISO Tariff or a Commission-accepted methodology, formally assigns a specific \npercentage or amount of project costs or revenue requirement to the Large Load \nFacility. The project and assignment must be identified in Schedule 4. A project’s \nregional designation, general system benefit, or inclusion in a CAISO transmission \nplan, without a specific assignment to the Large Load Facility, does not by itself make \nthe project a CAISO-Assigned Regional Project. \n2.14. “CAISO Requirements” means the CAISO Tariff, the Transmission Control \nAgreement, any other agreement to which CAISO is a party that is on file with or \naccepted by the Commission, and any Commission order, regulation, or Commission-\naccepted methodology applicable to CAISO, each as amended from time to time, \ntogether with any CAISO business practice manual or procedure to the extent it \nimplements any of the foregoing. \n2.15. “Calendar Day” means every day, including Saturdays, Sundays, federal holidays, \nand other holidays. \n2.16. “Construction Security” has the meaning set forth in Section 7.1.  \n2.17. “Covered Upgrade” means each Large Load-Driven Upgrade and each DesertLink-\nowned CAISO-Assigned Regional Project share that is included in Schedule 1 or \nSchedule 4, as applicable, and for which an Annual MTRC is established under this \nAgreement. \n2.18. “Credit Review Event” means a payment default, credit rating downgrade of the \nEligible Customer or an issuing bank that has not yet triggered a Material Adverse \nCredit Event, a notice of nonrenewal of a Letter of Credit, or another event that, in \nDesertLink’s reasonable judgment, warrants updated credit information. A Credit \nReview Event does not, by itself, require delivery of additional Security absent a \nresulting shortfall. \n2.19. “Cumulative Revenue Ledger” means the customer-, Large Load Facility-, project-, \nand Covered Upgrade-specific record maintained by DesertLink under Section 6.7. \nThe Cumulative Revenue Ledger shall identify the applicable Total Required Revenue"},{"page":97,"startToken":38044,"endToken":38446,"text":"5 \n \nCommitment, Annual MTRC, Qualifying Transmission Revenues, Supplemental \nMTRC Receipts, Applied Security Proceeds, effective prospective reassignments, \nother permitted adjustments, and the resulting Remaining Cumulative Revenue \nResponsibility and Required Operational Security. \n2.20. “Cumulative Revenue Responsibility” or “Remaining Cumulative Revenue \nResponsibility” means the Total Required Revenue Commitment less amounts that \nhave satisfied that commitment under Section 6.7. \n2.21. “Dispute Determination” has the meaning set forth in Section 11.5. \n2.22. “Distribution Utility” means the public utility, municipal utility, cooperative, or other \nentity that owns, operates, or is responsible for the distribution facilities to which the \nLarge Load Facility is interconnected or proposed to be interconnected, including its \nsuccessors and permitted assigns. \n2.23. “Effective Date” has the meaning set forth in Section 3.1. \n2.24. “Estimated Annual MTRC” means the annual MTRC for a Covered Upgrade \ncalculated from the then-current estimated capital cost using the MTRC Calculation \nTemplate in Schedule 5. DesertLink may update the Estimated Annual MTRC as costs \nchange during construction, including when DesertLink requires additional \nConstruction Security. \n2.25. “Event of Default” has the meaning set forth in Section 7.11. \n2.26. “Final Annual MTRC” means the fixed Annual MTRC for a Covered Upgrade \nestablished on the Final MTRC Determination Date using final incurred capital cost \nand the Project-Specific Levelized Fixed Charge Rate calculated under the MTRC \nCalculation Template in Schedule 5, including the agreed five percent (5%) annual \nlevelized-depreciation schedule over the twenty (20)-year MTRC Term. The Final \nAnnual MTRC is not recalculated through DesertLink’s Formula Rate or Protocols \nand may be recalculated only as provided in Section 6.3.1. \n2.27. “Final MTRC Determination Date” means the date on which DesertLink establishes \nthe Final Annual MTRC for a Covered Upgrade, which shall occur within one (1) year \nafter the applicable Covered Upgrade enters service, when the actual capital cost of \nthat Covered Upgrade is known and all costs associated with its estimated capital cost \nhave been accounted for. \n2.28. “Force Majeure” means any cause beyond the reasonable control of the Party \nclaiming, and without the fault or negligence of such Party, which materially prevents \nor impairs the performance of such Party’s obligations hereunder, including but not \nlimited to landslides, storms, ice storms, flood, drought, tornado, hurricane, lightning, \nearthquake, fire, explosion, failure or imminent threat of failure of facilities, supply \nchain issues, civil disturbance, strike, or other labor disturbance, sabotage, vandalism,"},{"page":98,"startToken":38446,"endToken":38887,"text":"6 \n \nriot, terrorism, blockade, insurrection, war, national emergency, or restraint by any \nGovernmental Authority. \n2.29. “Forecast TRBAA Credit” has the meaning set forth in Section 6.8. \n2.30. “Formula Rate” means DesertLink’s transmission formula rate template and \nassociated provisions in the TO Tariff, as accepted by the Commission and amended \nfrom time to time. \n2.31. “Governmental Authority” means any federal, state, local, or other governmental, \nregulatory, or administrative agency, court, commission, department, board, \nlegislature, rulemaking body, tribunal, or other governmental authority having \njurisdiction over a Party, the Large Load Facility, any Large Load-Driven Upgrade, or \nthe services or obligations addressed by this Agreement. \n2.32. “Initial Allocation Percentage” has the meaning set forth in Section 6.3.2. \n2.33. “Large Load-Driven Upgrades” means the transmission facilities owned or to be \nconstructed by DesertLink and identified in Schedule 1 that the applicable study \ndetermines are driven in whole or in part by the Large Load Facility, alone or together \nwith one or more other large loads. Large Load-Driven Upgrades do not include \nAffected System Upgrades or any facilities whose costs are directly assigned to and \npaid by Eligible Customer under an Interconnection Agreement and are not included \nin DesertLink’s rate base. Where a Large Load-Driven Upgrade is an addition to or \nmodification of a facility jointly owned by DesertLink and another entity, the Large \nLoad-Driven Upgrade includes only DesertLink’s ownership share identified in \nSchedule 1. \n2.34. “Large Load Facility” means the new or incremental load facility owned, operated, \nor proposed to be developed by Large Load Customer and identified in Schedule 1. \n2.35. “Large Load Service Commencement Date” means the date on which the Large \nLoad Facility first takes electric service through the CAISO Controlled Grid or \notherwise begins receiving service under the applicable CAISO Tariff arrangement, as \nspecified in Schedule 1. If the Large Load Facility is not reflected in a CAISO billing \ndeterminant used to assess TAC, Schedule 2 shall identify the applicable wholesale \ntransmission-access, wheeling, or other CAISO Tariff billing arrangement. \n2.36. “Letter of Credit” means an irrevocable, transferable standby letter of credit issued \nfor the benefit of DesertLink, meeting the requirements of Schedule 3. \n2.37. “Material Adverse Credit Event” means any of the following: (a) a bankruptcy, \ninsolvency, receivership, or similar event described in Section 7.6(e); (b) a reduction \nin the long-term senior unsecured debt rating of the Eligible Customer or an issuing \nbank below the standards set out in Section 4 of Schedule 3; (c) loss, cancellation, \nmaterial impairment, or expiration of Qualifying Retail Security Support without \ntimely replacement; (d) an incorrect, expired, withdrawn, unavailable, or materially"},{"page":99,"startToken":38887,"endToken":39314,"text":"7 \n \nmisleading Retail Security Certification, as described in Section 7.7 of this Agreement; \nor (e) another event that, in DesertLink’s reasonable judgment, materially impairs \nEligible Customer's ability to perform its payment or Security obligations under this \nAgreement. \n2.38. “MTRC Term” means, with respect to each Covered Upgrade, the period beginning \non and including the applicable Upgrade In-Service Date or Regional Project In-\nService Date, as applicable, and ending on the day immediately preceding the \ntwentieth (20th) anniversary of that in-service date (the “MTRC Term End Date”). The \nfirst and final Rate Years of the MTRC Term shall be prorated for partial-year service. \n2.39. “MTRC Term End Date” has the meaning set forth in the definition of “MTRC \nTerm.” \n2.40. “Net Revenue Requirement” means DesertLink’s Net Annual Transmission Revenue \nRequirement calculated under its Formula Rate for the applicable Rate Year. \n2.41. “Notice of Dispute” has the meaning set forth in Section 11.1. \n2.42. “Operational Security” has the meaning set forth in Sections 7.2 and 7.5. \n2.43. “Outside Date” means the date identified as the Outside Date in Schedule 1, as such \ndate may be extended by written agreement of the Parties. \n2.44. “Pre-In-Service Termination Costs” has the meaning set forth in Section 3.3.2. \n2.45. “Qualifying Retail Security Support” means retail-customer security for which \nEligible Customer has delivered a currently effective Retail Security Certification \nunder Schedule 3. \n2.46. “Qualifying Transmission Revenues” or “QTR” has the meaning set forth in Section \n6.2.  \n2.47. “Reconciliation Statement” has the meaning set forth in Section 6.6. \n2.48. “Regional Project Allocated ARR” means, for the share of a CAISO-Assigned \nRegional Project that is owned by DesertLink, included in DesertLink’s Formula Rate, \nand formally allocated to the Large Load Facility under the applicable CAISO Tariff \nprovision or Commission-accepted methodology, the Annual MTRC for that project \nshare calculated under Section 6.3.5 and the MTRC Calculation Template in Schedule \n5, which shall be the Estimated Annual MTRC before the Final MTRC Determination \nDate and the Final Annual MTRC on and after that date. The Regional Project \nAllocated ARR is calculated using DesertLink’s allocated share of the project’s \nestimated or final capital cost, as applicable, by applying the Project-Specific \nLevelized Fixed Charge Rate calculated under Schedule 5. For purposes of calculating \npresent-worth federal and state income-tax depreciation benefits, Schedule 5 applies a \nlevelized-depreciation rate of five percent (5%) of that allocated capital-cost share in \neach year of the applicable twenty (20)-year MTRC Term. The resulting Regional"},{"page":100,"startToken":39314,"endToken":39676,"text":"8 \n \nProject Allocated ARR shall be recorded in Schedule 4. If CAISO states the \nassignment as an annual revenue-requirement share rather than a capital-cost amount, \nthe equivalent capital-cost input shall be determined only under the allocation method \nestablished by the CAISO Tariff or a Commission-accepted methodology. \n2.49. “Regional Project In-Service Date” means, for a CAISO-Assigned Regional Project \nowned by DesertLink, the date the project, or a separately identifiable and separately \nallocated portion of it, is energized, placed in service, and recorded as electric plant in \nservice on DesertLink’s books. Schedule 4 shall identify the expected Regional Project \nIn-Service Date for each project or separately identifiable portion. Inclusion of \nConstruction Work in Progress in rate base before that date does not constitute a \nRegional Project In-Service Date. \n2.50. “Required Operational Security” means the amount of Operational Security required \nunder Section 7.3 and Schedule 3, equal to the nominal Remaining Cumulative \nRevenue Responsibility except to the extent satisfied by Qualifying Retail Security \nSupport. \n2.51. “Required Security Amount” means the aggregate Security then required under this \nAgreement. \n2.52. “Retail Security Certification” means a certification substantially in the form of \nExhibit A contained in Schedule 3 of this Agreement, signed by an authorized officer \nof Eligible Customer, confirming that the Large Load Customer has posted retail \nsecurity with Eligible Customer that is available, through enforceable draw or \napplication rights or a binding undertaking, to satisfy the corresponding wholesale \nobligations under this Agreement. \n2.53. “Security” means Construction Security or Operational Security, as the context \nrequires.  \n2.54. “Security Notice” means DesertLink’s written notice of a required increase, \nrestoration, replacement, or other adjustment to Security, including reasonable \nsupporting detail then available. \n2.55. “Successor Eligible Customer” means an Eligible Customer that assumes \nresponsibility under Section 6.10. \n2.56. “Supplemental MTRC” has the meaning set forth in Section 6.4. \n2.57. “Supplemental MTRC Receipts” means payments of Supplemental MTRC received \nby Transmission Owner from or on behalf of Eligible Customer, excluding Applied \nSecurity Proceeds. \n2.58. “TAC” means the Transmission Access Charge, as defined in Appendix A to the \nCAISO Tariff, including the applicable Access Charge components identified in \nSchedule 2."},{"page":101,"startToken":39676,"endToken":40125,"text":"9 \n \n2.59. “Termination Cost Reconciliation” has the meaning set forth in Section 3.3.2. \n2.60. “Termination Fee” has the meaning set forth in Section 3.3.4. \n2.61. “Termination Fee Account” has the meaning set forth in Section 3.3.4.  \n2.62. “Termination Fee Balance” has the meaning set forth in Section 3.3.4. \n2.63. “Total Required Revenue Commitment” has the meaning set forth in Section 6.7. \n2.64. “Transmission Revenue Balancing Account Adjustment” or “TRBAA” means the \nTransmission Revenue Balancing Account Adjustment maintained by DesertLink \nunder Section 5.5 of the TO Tariff, as amended from time to time, and “Transmission \nRevenue Balancing Account” or “TRBA” means the associated balancing account \nmaintained under that Section. \n2.65. “TRBAA Credit” means a Forecast TRBAA Credit or an amount recorded in the \nTRBA under Section 6.8 for Supplemental MTRC Receipts, Applied Security \nProceeds other than Applied Security Proceeds applied to a Termination Fee, Annual \nTermination Fee Credits, or a duplicate-recovery credit under Section 3.3.3(d) or \nSection 6.3.5, in each case as flowed through to transmission customers through the \nTRBAA. A TRBAA Credit is not an input to the MTRC Calculation Template or the \nFormula Rate. \n2.66. “Upgrade In-Service Date” means, with respect to each Large Load-Driven Upgrade, \nthe date on which that Large Load-Driven Upgrade is energized, placed in service, and \nincluded as Electric Plant in Service in DesertLink’s rate base. Schedule 1 shall \nidentify the expected Upgrade In-Service Date for each Large Load-Driven Upgrade. \nInclusion of Construction Work in Progress in rate base before an upgrade is placed in \nservice does not constitute its Upgrade In-Service Date. \n3. Effective Date, Term and Termination \n3.1. \nEffective Date. This Agreement shall become effective upon execution by the Parties, \nsubject to acceptance by the Federal Energy Regulatory Commission (“FERC” or \n“Commission”) (if applicable), or, if filed unexecuted, upon the date specified by \nFERC (the “Effective Date”). \n3.2. \nTerm. This Agreement shall remain in effect from the Effective Date until DesertLink \nissues a final Reconciliation Statement determining that the Total Required Revenue \nCommitment for every Covered Upgrade has been satisfied, transferred to a successor, \nprospectively reassigned, or otherwise discharged. The MTRC Term for each Covered \nUpgrade begins on its applicable Upgrade In-Service Date or Regional Project In-\nService Date and ends on its applicable MTRC Term End Date. Earlier Break-Even \nremains available if the Total Required Revenue Commitment is satisfied before the \napplicable MTRC Term End Date. If DesertLink holds a Termination Fee Balance \nwhen the Total Required Revenue Commitment is otherwise discharged, this \nAgreement shall remain in effect for purposes of the Termination Fee Account"},{"page":102,"startToken":40125,"endToken":40572,"text":"10 \n \nprovisions in Section 3.3.4 until the Termination Fee Balance has been fully credited \nor released. \n3.3. \nTermination. This Agreement may be terminated as follows:  \n3.3.1. \nTermination Before the First Applicable In-Service Date. Before any Large \nLoad-Driven Upgrade reaches its Upgrade In-Service Date and before any \nDesertLink-owned CAISO-Assigned Regional Project reaches its Regional \nProject In-Service Date, this Agreement may be terminated upon thirty (30) \nCalendar Days’ written notice if: (a) the Large Load Service Commencement \nDate has not occurred by the Outside Date; (b) Eligible Customer or Large Load \nCustomer cancels or abandons the Large Load Facility or associated request for \nservice; (c) the applicable interconnection, access to the CAISO Controlled Grid, \nor other arrangement necessary for the Large Load Facility is terminated; (d) an \nEvent of Default has occurred and is continuing, or DesertLink exercises a \ntermination right arising from default under this Agreement or an applicable \ninterconnection or transmission service agreement; or (e) Eligible Customer fails \nto timely execute, maintain, or provide the documentation, financial security, or \ncredit support required under Sections 4.2, 6.3.6, or 7.1, and such failure \ncontinues for ten (10) Business Days after written notice from DesertLink or \ncannot reasonably be cured by the date on which DesertLink must commence or \ncontinue physical construction or incur a material noncancelable procurement or \nconstruction commitment. Any such termination shall be subject to Applicable \nLaws and Regulations and any required Commission authorization or acceptance \nand shall not release or limit the obligations described in Sections 3.3.2 and \n3.3.3.  \nIf any Large Load-Driven Upgrade has reached its Upgrade In-Service Date or \nany DesertLink-owned CAISO-Assigned Regional Project has reached its \nRegional Project In-Service Date identified in Schedule 4, cancellation, \nabandonment, termination, or failure of the Large Load Facility to commence or \ncontinue service shall not terminate this Agreement. Section 3.3.4 and Articles 6 \nand 7 shall apply to each Large Load-Driven Upgrade and DesertLink-owned \nCAISO-Assigned Regional Project for which the applicable in-service date has \noccurred. Section 6.3.6 shall govern any assigned share of a project owned by \nanother entity. \n3.3.2. \nPre-In-Service Termination Costs and Construction Security. If the Large \nLoad Facility, its associated request for service, or any associated Large Load-\nDriven Upgrade is cancelled, abandoned, or otherwise terminated before an \napplicable Large Load-Driven Upgrade reaches its Upgrade In-Service Date, \nEligible Customer shall be responsible for all actual and reasonable costs \nprudently incurred or irrevocably committed by DesertLink with respect to that \nLarge Load-Driven Upgrade that have not otherwise been recovered by \nDesertLink (“Pre-In-Service Termination Costs”). Pre-In-Service Termination \nCosts include costs incurred before or after the applicable cancellation,"},{"page":103,"startToken":40572,"endToken":40960,"text":"11 \n \nabandonment, or termination to wind down, secure, remove, or otherwise address \nthe unfinished Large Load-Driven Upgrade. \nPre-In-Service Termination Costs include, as applicable: \n(a) engineering, design, study, permitting, environmental, siting, land and land-\nright, procurement, construction, testing, project management, legal, \nregulatory, and administrative costs; \n(b) vendor and contractor cancellation charges, termination charges, change-\norder costs, restocking charges, demobilization costs, contract closeout costs, \nand third-party claims; \n(c) the costs of securing, preserving, mothballing, relocating, redeploying, \ndismantling, removing, transporting, storing, selling, or disposing of \nequipment, materials, and partially completed facilities; \n(d) site restoration, environmental remediation, and the restoration or \nmodification of DesertLink’s existing facilities made necessary by the \ncancellation or abandonment; \n(e) Allowance for Funds Used During Construction (“AFUDC”) properly \naccrued in accordance with the Commission’s Uniform System of Accounts \nthrough the date on which the applicable construction activities cease or the \napplicable project is determined to have been abandoned, excluding AFUDC \nassociated with amounts of Construction Work in Progress included in rate \nbase or otherwise recovered through rates; and \n(f) any other costs reasonably incurred by DesertLink as a direct result of the \ncancellation, abandonment, suspension, or termination. \nDesertLink may draw upon and apply Construction Security to Pre-In-Service \nTermination Costs as such costs are incurred or the associated obligations \nbecome fixed and payable. DesertLink may retain Construction Security until all \nPre-In-Service Termination Costs are reasonably determinable and DesertLink \nhas served on Eligible Customer a final statement reconciling Pre-In-Service \nTermination Costs, Construction Security applied, and the recoveries described \nin this Section, together with supporting information (the “Termination Cost \nReconciliation”). Construction Security does not limit Eligible Customer’s \nunderlying liability. Eligible Customer shall pay any deficiency within ten (10) \nBusiness Days after receipt of the Termination Cost Reconciliation. The \nTermination Cost Reconciliation shall become final in the same manner and \nwithin the same period as a Reconciliation Statement under Section 6.6, and \nDesertLink shall release any excess Construction Security after the Termination \nCost Reconciliation becomes final, including through resolution of any dispute \nunder Article 11. Construction Security applied under this Section does not \nconstitute Applied Security Proceeds and does not produce a TRBAA Credit \nexcept to the extent provided in Section 3.3.3(d). Nothing in this Agreement \nlimits DesertLink’s right to seek recovery of unpaid Pre-In-Service Termination \nCosts through its Formula Rate or otherwise as the Commission may authorize."},{"page":104,"startToken":40960,"endToken":41391,"text":"12 \n \nDesertLink shall use commercially reasonable efforts to mitigate Pre-In-Service \nTermination Costs, provided that DesertLink shall not be required to take any \naction inconsistent with prudent utility practice, safety requirements, Applicable \nLaws and Regulations, existing contractual obligations, or the reliable operation \nof its transmission facilities. The Termination Cost Reconciliation shall reflect, \nwhen realized, applicable vendor refunds, insurance recoveries, net salvage \nproceeds, reuse or redeployment credits, and other recoveries attributable to the \ncancelled or abandoned scope, but shall not credit amounts representing \nDesertLink’s lawfully earned return or carrying costs except to the extent \nnecessary to prevent duplicate recovery. \nThis Section applies separately to each Large Load-Driven Upgrade. If one or \nmore Large Load-Driven Upgrades have reached their Upgrade In-Service Dates \nwhen the Large Load Facility or associated request for service is cancelled, this \nSection shall apply only to the Large Load-Driven Upgrades and portions of the \nproject that have not reached their Upgrade In-Service Dates. The treatment of \neach Large Load-Driven Upgrade that has reached its Upgrade In-Service Date \nshall be governed by Section 3.3.4 and Articles 6 and 7. \n3.3.3. \nRate Base and Formula Rate Treatment Before an Upgrade In-Service \nDate. To the extent costs associated with a cancelled or abandoned Large Load-\nDriven Upgrade that has not reached its Upgrade In-Service Date have been \nincluded in Construction Work in Progress or any other component of \nDesertLink’s rate base, DesertLink shall, consistent with the Commission’s \nUniform System of Accounts, its Formula Rate and Protocols, and other \nApplicable Laws and Regulations: \n(a) remove, reclassify, or otherwise exclude such costs from rate base to the \nextent required by applicable Commission accounting and ratemaking \nrequirements; \n(b) reflect that treatment in the next practicable Annual Update and \ncorresponding true-up; \n(c) cease accruing AFUDC to the extent and at the time required by the \nCommission’s accounting requirements; and \n(d) make any adjustment or credit necessary to prevent DesertLink from \nrecovering the same cost both through Construction Security or another \npayment by Eligible Customer and through its Formula Rate; provided that \nany such credit to transmission customers shall be recorded in the TRBA and \nflowed through to transmission customers through the TRBAA as provided \nin Section 6.8, and not through a revenue credit or other input to the Formula \nRate. \nAny depreciation, amortization, or other amount recovered through DesertLink’s \nFormula Rate that represents recovery of the same underlying capital or expense \nincluded in Pre-In-Service Termination Costs shall be reflected, without \nduplication, in the Termination Cost Reconciliation under Section 3.3.2. \nApplication of Construction Security shall not require DesertLink to refund or"},{"page":105,"startToken":41391,"endToken":41783,"text":"13 \n \nsurrender any return, carrying cost, tax allowance, or other amount lawfully \nrecovered for a period during which DesertLink’s investment was properly \nincluded in rate base, except to the extent necessary to prevent duplicate \nrecovery. \nThis Section 3.3.3 applies only to a Large Load-Driven Upgrade, or portion \nthereof, that has not reached its Upgrade In-Service Date. \n3.3.4. \nEffect of Cancellation After an Upgrade or Regional Project In-Service \nDate. After any Large Load-Driven Upgrade reaches its Upgrade In-Service \nDate or any DesertLink-owned CAISO-Assigned Regional Project reaches its \nRegional Project In-Service Date specified in Schedule 4, Eligible Customer \nshall promptly notify DesertLink if Eligible Customer or Large Load Customer \nanticipates or becomes aware of the cancellation, abandonment, downsizing, \ncurtailment, permanent cessation, or material reduction of service at the Large \nLoad Facility. \nCancellation, abandonment, suspension, downsizing, termination, or failure of \nthe Large Load Facility to commence or continue service shall not, by itself: \n(a) terminate this Agreement; \n(b) require the removal from rate base of a Large Load-Driven Upgrade or a \nDesertLink-owned CAISO-Assigned Regional Project that has reached its in-\nservice date; \n(c) reduce or cap any Annual MTRC, Regional Project Allocated ARR, Total \nRequired Revenue Commitment, or remaining Cumulative Revenue \nResponsibility; or \n(d) terminate, reduce, or excuse Eligible Customer’s obligation to pay the \nSupplemental MTRC and prior-period true-up adjustments under Section 6.6, \nmaintain and replenish Operational Security, or satisfy the remaining \nCumulative Revenue Responsibility. \nUpon any effective termination of this Agreement, or upon the permanent \ncessation of service by the Large Load Facility following an applicable Upgrade \nIn-Service Date or Regional Project In-Service Date, Eligible Customer shall pay \nDesertLink a one-time lump-sum termination fee equal to the Remaining \nCumulative Revenue Responsibility, less any Supplemental MTRC that has been \nbilled and remains unpaid as of the effective termination or cessation date (the \n“Termination Fee”). DesertLink shall calculate the Termination Fee separately \nfor each Covered Upgrade that has reached its applicable in-service date from the \nmost recently served Cumulative Revenue Ledger, updated through the effective \ntermination or cessation date for then-known Qualifying Transmission Revenues, \nSupplemental MTRC Receipts, Applied Security Proceeds, billed and unpaid \nSupplemental MTRC, and any effective prospective reassignment. Billed and \nunpaid Supplemental MTRC excluded from the Termination Fee remains \nseparately payable and secured; its later payment, satisfaction through Applied \nSecurity Proceeds, or direct recovery shall reduce the Cumulative Revenue"},{"page":106,"startToken":41783,"endToken":42256,"text":"14 \n \nResponsibility. The Termination Fee is due thirty (30) Calendar Days after \nDesertLink’s invoice. It is an accelerated contractual termination charge, not a \npenalty or consideration for future transmission service. Its receipt in full \ndischarges only the remaining Cumulative Revenue Responsibility included in \nthe fee. The Termination Fee is not a Supplemental MTRC Receipt, Applied \nSecurity Proceeds, prepayment for future transmission service, customer advance \nfor construction, contribution in aid of construction, or reduction to rate base. \nDesertLink shall administer the Termination Fee only as provided in Section \n3.3.4 and Article 6. \nEach Large Load-Driven Upgrade that has reached its Upgrade In-Service Date \nand each DesertLink-owned CAISO-Assigned Regional Project for which an \nAnnual MTRC has been established shall remain subject to the applicable \nFormula Rate and Protocols for so long as it is properly includable in rate base \nunder applicable Commission requirements. The associated payment, Security, \nreconciliation, and TRBAA Credit obligations shall continue in accordance with \nArticles 6 and 7, subject to any prospective reassignment or adjustment \nauthorized under the CAISO Tariff or a Commission-accepted methodology, or \ntransfer to a Successor Eligible Customer under Section 6.10. \nDesertLink shall hold each Termination Fee, and any proceeds of Operational \nSecurity applied to its payment, in a separately identified, interest bearing \nTermination Fee Account for the applicable Covered Upgrade. The amounts in \nthat account, together with actual earnings and less amounts credited or released, \nconstitute the “Termination Fee Balance.” For each Covered Upgrade, the \nAnnual Termination Fee Credit for each Rate Year remaining in the MTRC \nTerm shall equal the applicable Annual MTRC, prorated for any partial Rate \nYear, but shall not exceed the then-available Termination Fee Balance. In the \nfinal Rate Year of the MTRC Term, the Annual Termination Fee Credit shall \ninclude the entire remaining Termination Fee Balance, including actual earnings, \nso that the Termination Fee Account is reduced to zero, subject to any amount \nrequired to be released under this Section 3.3.4. DesertLink shall include each \nAnnual Termination Fee Credit in the TRBAA only for the Rate Year for which \nit is scheduled. The Termination Fee Balance shall be separately accounted for as \na deferred liability pending its scheduled annual TRBAA treatment, shall not be \nincluded in rate base, and shall not itself be a TRBAA Credit or Formula Rate \ninput. If a prospective reassignment becomes effective after receipt of a \nTermination Fee, DesertLink shall release the portion of the Termination Fee \nBalance attributable to the reassigned responsibility, together with actual \nearnings, and prospectively adjust the remaining Annual Termination Fee \nCredits. \nIf the Commission subsequently requires DesertLink to retire, remove, reclassify, \nor exclude all or a portion of an in-service Large Load-Driven Upgrade or \nDesertLink-owned CAISO-Assigned Regional Project from rate base, \nDesertLink shall make corresponding prospective adjustments to the applicable \nAnnual MTRC, Regional Project Allocated ARR, Total Required Revenue"},{"page":107,"startToken":42256,"endToken":42696,"text":"15 \n \nCommitment, Cumulative Revenue Responsibility, Supplemental MTRC, and \nOperational Security. Such adjustments shall prevent Eligible Customer from \nremaining responsible under this Agreement for costs that are no longer included \nin DesertLink’s transmission revenue requirement, without requiring a refund or \nreopening of amounts properly determined for a prior Rate Year. \nIf, at the time of cancellation or abandonment, one or more Large Load-Driven \nUpgrades have reached their Upgrade In-Service Dates or a DesertLink-owned \nCAISO-Assigned Regional Project has reached its project in-service date, and \none or more other upgrades or project shares have not, Sections 3.3.2 and 3.3.3 \nshall apply to Large Load-Driven Upgrades and project scope that have not \nreached their applicable in-service dates; this Section 3.3.4 and Articles 6 and 7 \nshall apply to the upgrades and DesertLink-owned project shares that have \nreached their applicable in-service dates; and Section 6.3.6 shall continue to \ngovern any assigned share of a project owned by another entity. \n3.3.5. \nMutual Termination. The Parties may terminate this Agreement by mutual \nwritten consent only after addressing all incurred construction costs, the \ncontinuing Cumulative Revenue Responsibility, Supplemental MTRC amounts, \nprior-period true-up adjustments, and Security. No termination is effective to \nextinguish such obligations unless expressly accepted or approved by FERC. \n3.4. \nRegulatory Effect of Termination. No termination shall become effective until the \nParties comply with all Applicable Laws and Regulations, including any required \nnotice to or acceptance by FERC. A regulatory rejection, cancellation, downsizing, \ncurtailment, cessation, Force Majeure event, or termination shall not excuse incurred \nconstruction costs or the obligations arising on or after an applicable Upgrade In-\nService Date or Regional Project In-Service Date unless FERC expressly determines \notherwise. \n3.5. \nEffect of Termination. Termination does not release Eligible Customer from \nobligations arising under Articles 4, 6, or 7, including future annual Supplemental \nMTRC payments, prior-period true-up adjustments, and Security maintenance and \nreplenishment, until the Cumulative Revenue Responsibility is finally satisfied or \ntransferred in accordance with this Agreement. Upon DesertLink’s receipt of the \nTermination Fee in full, no further Supplemental MTRC shall accrue for any period \nafter the effective termination or cessation date, subject to final true-ups and \nreconciliation for periods before that date. Security does not limit the underlying \nliability. The Large Load Customer’s information, notice, authorization, and \ncooperation obligations stated in its Limited Acknowledgment also survive.  \n4. Transmission Project \n4.1. \nDesign, Procurement, and Construction. Subject to Eligible Customer’s execution \nof this Agreement and the relevant Interconnection Agreement, delivery of \nConstruction Security under Section 7.1, and satisfaction of Section 4.2, DesertLink \nshall design, procure, construct, install, and own the Large Load-Driven Upgrades"},{"page":108,"startToken":42696,"endToken":43068,"text":"16 \n \ndescribed in the relevant Interconnection Agreement and Schedule 1, using reasonable \nefforts to meet the applicable construction schedule and expected Upgrade In-Service \nDates.  \nEligible Customer shall maintain Construction Security under Section 7.1 sufficient to \nsecure DesertLink’s incurred and committed construction costs and the Pre-In-Service \nTermination Costs described in Section 3.3.2. Construction Security shall apply \nseparately to each Large Load-Driven Upgrade until that upgrade reaches its Upgrade \nIn-Service Date and the conditions for release or conversion under Section 7.2 have \nbeen satisfied. \nIf different Large Load-Driven Upgrades reach their Upgrade In-Service Dates on \ndifferent dates, Construction Security shall continue to apply to each Large Load-\nDriven Upgrade and portion of the project that has not reached its Upgrade In-Service \nDate, notwithstanding the release or conversion of Construction Security attributable \nto an upgrade that has entered service. \nUpon cancellation, abandonment, or termination, before an applicable Large Load-\nDriven Upgrade reaches its Upgrade In-Service Date, DesertLink may draw, retain, \nand apply Construction Security in accordance with Sections 3.3.2 and 7.1 and the \nrelevant Interconnection Agreement. DesertLink shall not be required to take action \ninconsistent with its safety practices, design criteria, construction procedures, \nApplicable Laws and Regulations, or the reliable operation of its transmission \nfacilities. \n4.2. \nAffected Systems \n4.2.1. Identification and Coordination. Eligible Customer shall cooperate with \nDesertLink, CAISO, each affected Participating TO, and each other Affected \nSystem Owner in identifying and studying potential impacts of the interconnection \nor service of the Large Load Facility on any Affected System. \n4.2.2. Required Affected System Arrangements. For each Affected System Upgrade \nidentified through an applicable study, Eligible Customer shall timely enter into and \nmaintain an Affected System Arrangement with the applicable Affected System \nOwner. Each Affected System Arrangement shall address, as applicable: \n(a) study, engineering, design, procurement, construction, testing, and \nenergization responsibilities; \n(b) responsibility for the costs of the Affected System Upgrade; \n(c) responsibility for cancellation, abandonment, demobilization, equipment \nremoval, disposition, remediation, restoration, AFUDC, and other costs \nresulting from cancellation or failure of the Large Load Facility to proceed; \n(d) construction-period and post-in-service payment obligations and financial \nsecurity or credit support sufficient to protect the Affected System Owner \nand its other customers against cost shifting;"},{"page":109,"startToken":43068,"endToken":43460,"text":"17 \n \n(e) applicable invoicing, reconciliation, true-up, refund, and release procedures; \nand \n(f) any Commission filing, acceptance, or other regulatory authorization \nrequired for the Affected System Arrangement. \n4.2.3. Evidence Before DesertLink Construction. At least thirty (30) Calendar Days \nbefore DesertLink’s scheduled commencement of physical construction, and in all \nevents before any notice to proceed for physical construction may occur or \nDesertLink incurs a material noncancelable procurement or construction \ncommitment, Eligible Customer shall provide DesertLink: \n(a) a complete copy of each executed Affected System Arrangement; \n(b) evidence that all financial security or credit support required to be effective \nbefore construction under each Affected System Arrangement has been provided; \n(c) evidence of any required Commission filing, acceptance, or other regulatory \nauthorization; and \n(d) a certification that each Affected System Arrangement remains in full force and \neffect and that Eligible Customer is not in default thereunder. \nDesertLink may permit specifically identified preliminary engineering, \nprocurement, or other limited activities to proceed before satisfaction of this Section \nby written notice. Such permission shall not waive any requirement of this Section \nor obligate DesertLink to commence or continue physical construction. \n4.2.4. Continuing Obligation. Eligible Customer shall promptly provide DesertLink a \ncopy of any material amendment, replacement, termination notice, default notice, \ndemand upon financial security or credit support, or other material notice \nconcerning an Affected System Arrangement. Eligible Customer shall maintain each \nrequired Affected System Arrangement and all financial security or credit support \nrequired thereunder until the obligations secured by that arrangement have been \nfinally satisfied, transferred, or released. \n4.2.5. Later-Identified Affected Systems. If an Affected System or Affected System \nUpgrade is identified after DesertLink has commenced work, Eligible Customer \nshall promptly enter into the required Affected System Arrangement and provide the \ndocumentation required by this Section. Subject to the applicable tariffs and \nagreements, DesertLink may suspend further work, procurement, energization, or \nservice to the extent reasonably necessary to avoid additional exposure until the \nrequirement is satisfied. \n4.2.6. Failure to Satisfy Requirements. Eligible Customer’s failure to timely execute, \nmaintain, or provide evidence of an Affected System Arrangement or required \nfinancial security or credit support constitutes a material default under this \nAgreement. Subject to Applicable Laws and Regulations and the applicable tariffs \nand agreements, DesertLink may: (a) decline to commence or continue construction \nor material procurement commitments; (b) suspend work, energization, or service;"},{"page":110,"startToken":43460,"endToken":43926,"text":"18 \n \n(c) exercise the termination right in Section 3.3.1; and (d) recover all resulting Pre-\nIn-Service Termination Costs and other amounts payable under this Agreement. \n4.2.7. Confidentiality. Documents provided under this Section shall be subject to the \nconfidentiality protections in Section 6.12. Eligible Customer may redact \ncommercially sensitive provisions unrelated to the requirements of this Section, but \nmay not redact information reasonably necessary for DesertLink to verify the scope, \neffectiveness, cost responsibility, financial security or credit support, termination \nprotection, or continuing enforceability of the Affected System Arrangement. \n4.2.8. Separate Administration. Costs, revenues, payments, and financial security or \ncredit support arising under an Affected System Arrangement shall be administered \nunder that arrangement and the applicable Affected System Owner’s tariff. Such \namounts shall not be included in any Annual MTRC, Total Required Revenue \nCommitment, Supplemental MTRC, Cumulative Revenue Responsibility, or \nTRBAA Credit, except to the extent expressly authorized by the Commission and \nnecessary to prevent duplicate recovery. \n5. Regulatory Approval(s) \n5.1. \nFERC Filing. This Agreement is the form of agreement required under Sections 10.9 \nand 10A.6 of the TO Tariff as a condition of DesertLink’s design, procurement, and \nconstruction of Large Load-Driven Upgrades. Consistent with 18 C.F.R. § 35.1(g), a \nconforming, executed Agreement entered into under the Commission-accepted pro \nforma with populated Schedules generally shall not require an individual filing under \nSection 205 of the Federal Power Act. DesertLink shall file an unexecuted Agreement \nor an Agreement containing a material deviation, and any other agreement required to \nbe filed by Commission order or rule. If FERC does not accept a required filing in its \nentirety, the Parties shall use reasonable efforts to amend and refile it; regulatory \nrejection does not excuse incurred construction costs or payment, Security, and true-up \nobligations for facilities placed in service, except to the extent FERC expressly \ndetermines otherwise.  \n6. Cost Recovery  \n6.1. \nCost Recovery and Minimum Contribution. DesertLink shall include the Large \nLoad-Driven Upgrades in its Formula Rate to the extent the project costs are properly \nincludable under the Formula Rate, the Protocols, and applicable law. This Agreement \ndoes not remove any Covered Upgrade from rate base or require a capital-cost \nreimbursement. The fixed twenty (20)-year Annual MTRC for each Covered Upgrade \nis instead calculated under the MTRC Calculation Template in Schedule 5, initially \nusing estimated cost and then using final incurred cost on the applicable Final MTRC \nDetermination Date. DesertLink shall recover its formula-rate revenue requirement \nthrough TAC and shall flow TRBAA Credits through to transmission customers \nthrough the TRBAA as provided in Section 6.8. Amounts received under this \nAgreement are not inputs to the Formula Rate, and this Agreement does not require \nany modification of the Formula Rate. Eligible Customer shall pay a Supplemental"},{"page":111,"startToken":43926,"endToken":44370,"text":"19 \n \nMTRC only to the extent forecast or actual Qualifying Transmission Revenues are less \nthan the applicable Annual MTRC. The Annual MTRC is a revenue floor, not an \nadditive charge, and does not alter CAISO cost allocation or DesertLink plant \naccounting. \nEligible Customer acknowledges that DesertLink will incur costs and undertake \nplanning, engineering, procurement, and construction in reliance on the Large Load \nFacility’s development and operation. Eligible Customer therefore accepts the \nwholesale payment and Security obligations in this Agreement. Any retail recovery \nfrom the Large Load Customer remains governed exclusively by applicable state law \nand Eligible Customer’s retail arrangements. \nAffected System Upgrades and the associated costs, revenues, payments, and financial \nsecurity or credit support are governed by Section 4.2 and the applicable Affected \nSystem Arrangement. Unless expressly authorized by the Commission, no Affected \nSystem Upgrade or associated revenue requirement shall be included in DesertLink’s \nAnnual MTRC, Total Required Revenue Commitment, Supplemental MTRC, \nCumulative Revenue Responsibility, or TRBAA Credit. \n6.2. \nQualifying Transmission Revenues. For each Rate Year or partial Rate Year, \n“Qualifying Transmission Revenues” means wholesale transmission revenues paid by \nor on behalf of Eligible Customer under the CAISO Tariff or another Commission-\naccepted arrangement that are attributable to service to the Large Load Facility and \nreduce transmission revenues otherwise collected from CAISO customers or directly \ncredit DesertLink’s Net Revenue Requirement. Qualifying Transmission Revenues \ninclude: (a) the portion of TAC revenue attributable to the Large Load Facility and \nallocable to DesertLink under the reproducible methodology in Schedule 2; and (b) \nWheeling Access Charges and other wholesale transmission-access, wheeling, or \ntransmission-service charges paid to CAISO, a Participating TO, or a non-PTO \ntransmission or load-serving entity for deliveries serving the Large Load Facility, but \nonly to the extent they reduce transmission revenues otherwise collected through TAC \nor directly credit DesertLink’s Net Revenue Requirement and are not otherwise \nreflected as a credit in calculating the Annual MTRC, the Supplemental MTRC, or a \nTRBAA Credit. Qualifying Transmission Revenues do not include Supplemental \nMTRC Receipts, Applied Security Proceeds, retail charges, or amounts that do not \nreduce transmission revenues otherwise collected from CAISO customers or directly \ncredit DesertLink’s Net Revenue Requirement. \n6.3. \nAnnual MTRC and Allocation.  \n6.3.1. Upgrade-Specific MTRC Calculation. DesertLink shall calculate a separate \nAnnual MTRC for each Covered Upgrade solely under the MTRC Calculation \nTemplate in Schedule 5. Before the Final MTRC Determination Date, DesertLink \nshall calculate and update the Estimated Annual MTRC from the then-current \nestimated capital cost. Within one (1) year after the applicable Covered Upgrade \nenters service, when the actual capital cost of that Covered Upgrade is known and \nall costs associated with its estimated capital cost have been accounted for,"},{"page":112,"startToken":44370,"endToken":44908,"text":"20 \n \nDesertLink shall establish the Final Annual MTRC using final incurred capital cost \nand the Project-Specific Levelized Fixed Charge Rate calculated under Schedule 5. \nSchedule 5 shall calculate the Project-Specific Levelized Fixed Charge Rate by: (i) \ndetermining the present-worth revenue requirement using the applicable capital \nstructure, cost of debt, return on equity, federal and state income-tax rates, income-\ntax conversion factor, and levelized-depreciation schedule; (ii) applying a \ndepreciation rate of five percent (5%) of the applicable capital cost input in each \nyear of the twenty (20)-year MTRC Term to calculate present-worth federal and \nstate income-tax depreciation benefits; (iii) annualizing the resulting present-worth \nrevenue requirement over the MTRC Term using the applicable after-tax discount \nrate and annualization factor; and (iv) adding the fixed expense allocator specified \nin Schedule 5. The Final Annual MTRC shall equal the applicable final incurred \ncapital cost multiplied by the resulting Project-Specific Levelized Fixed Charge \nRate. No component reflected in the Project-Specific Levelized Fixed Charge Rate \nor the fixed expense allocator shall be added again as a separate component of the \nAnnual MTRC. The Final Annual MTRC and the Schedule 5 inputs used to \ncalculate it are fixed as of the Final MTRC Determination Date and shall not be \nrecalculated for later changes in actual cost, Formula Rate inputs, or other cost-of-\nservice components, except to correct an error or fraud, to implement an effective \nprospective reassignment, to implement a final FERC order applicable to the \ncalculation, or to reflect, prospectively, a change in (i) DesertLink’s return on equity \ncomponent of its Formula Rate, resulting from a final FERC order accepting or \napproving such change, or (ii) applicable federal or state income tax rates or income \ntax law enacted after the Final MTRC Determination Date; provided that, the five \npercent (5%) annual levelized-depreciation schedule in Schedule 5 shall remain \nfixed for the MTRC Term unless a final FERC order requires otherwise. If \nDesertLink adjusts the Final Annual MTRC after the Final MTRC Determination \nDate pursuant to the foregoing provision, DesertLink shall update the MTRC \nCalculation Template and serve it upon Eligible Customer in accordance with the \nnotice provisions contained in this Agreement. Upon such service to Eligible \nCustomer, the updated MTRC Calculation Template shall replace the existing \nMTRC Calculation Template in its entirety and become effective on the date of such \nservice. The foregoing effectiveness of an updated MTRC Calculation Template \ndoes not preclude Eligible Customer from disputing any change to the MTRC \nCalculation Template pursuant to Article 11 of this Agreement. Any resulting \nadjustment to the Total Required Revenue Commitment shall apply only to the Rate \nYears remaining in the MTRC Term as provided in Section 6.7. \nEach Annual MTRC shall apply for its separate twenty (20)-year MTRC Term, with \nthe initial and final partial Rate Years prorated based on the number of monthly \nBilling Periods in the applicable Rate Year during which the Covered Upgrade is in \nservice. Schedule 1 shall identify the initial Estimated Annual MTRC and initial \nprojected Total Required Revenue Commitment for each Large Load-Driven \nUpgrade, and Schedule 5 shall record the Final MTRC Determination Date, Final \nAnnual MTRC, Total Required Revenue Commitment, and the completed \ncalculation for each Covered Upgrade. Schedule 4 shall provide the corresponding"},{"page":113,"startToken":44908,"endToken":45343,"text":"21 \n \nproject-specific information for a DesertLink-owned CAISO-Assigned Regional \nProject, if applicable. \n6.3.2. Initial Allocation. Schedule 1 shall identify, separately for each Large Load-\nDriven Upgrade, the percentage of the upgrade initially allocated to the Large Load \nCustomer under this Agreement (the “Initial Allocation Percentage”). The Initial \nAllocation Percentage shall be determined using the applicable final study and \nallocation methodology and shall account for: \n(a) Large Load Customers studied individually, jointly, or in a cluster; \n(b) the extent to which two or more Large Load Customers caused the need for \nor share a Large Load-Driven Upgrade; \n(c) differing requested service levels, development phases, and facility \nconfigurations; and \n(d) any portion of the facility determined at the outset to serve other \ntransmission system needs or customers. \nThe aggregate percentages allocated to all Large Load Customers for a Large Load-\nDriven Upgrade shall not exceed one hundred percent (100%). Any portion not \nallocated to a Large Load Customer shall be excluded from the Annual MTRC \nallocable to any Large Load Customer and remain subject to the otherwise-\napplicable CAISO cost allocation and rate recovery requirements. \n6.3.3. Applicable Allocation Percentage. For each Large Load-Driven Upgrade, the \n“Applicable Allocation Percentage” shall equal the Initial Allocation Percentage \nidentified in Schedule 1, as adjusted prospectively by any reassignment effective \nunder Section 6.9 or as otherwise required by a final Commission order or \napplicable tariff provision. A cancellation, abandonment, downsizing, curtailment, \npermanent cessation, or material reduction of service by the Large Load Customer \nshall not, by itself, reduce the Applicable Allocation Percentage. \n6.3.4. Annual MTRC Allocation. The Annual MTRC applicable to Eligible Customer \nshall equal the Annual MTRC for the Covered Upgrade as a whole multiplied by the \nApplicable Allocation Percentage; provided that, where Schedule 5 applies that \npercentage to capital cost or otherwise calculates the Annual MTRC for an already \nallocated project share, the resulting Annual MTRC is already allocated and the \npercentage shall not be applied again. DesertLink shall maintain the calculation \nseparately by Large Load Customer, Large Load Facility, and Covered Upgrade. \nThe aggregate Annual MTRCs allocated to all large load customers shall not exceed \nthe Annual MTRC for the Covered Upgrade as a whole. \n6.3.5. CAISO-Assigned Regional Projects Owned by DesertLink. For each CAISO-\nAssigned Regional Project owned by DesertLink and included in its Formula Rate, \nDesertLink shall calculate separately the Regional Project Allocated ARR \nattributable to the specific share formally assigned to the Large Load Facility. The \nRegional Project Allocated ARR shall be calculated solely under the MTRC \nCalculation Template in Schedule 5, using DesertLink’s allocated share of the"},{"page":114,"startToken":45343,"endToken":45851,"text":"22 \n \nproject’s estimated capital cost before the Final MTRC Determination Date and its \nallocated share of final incurred capital cost on that date, and shall be established, \nupdated, and fixed in the same manner and on the same schedule that Section 6.3.1 \nprovides for other Covered Upgrades. The resulting Annual MTRC shall be \nincluded in the Supplemental MTRC calculation and the Total Required Revenue \nCommitment beginning on the Regional Project In-Service Date. The allocated \nshare shall be determined under the applicable allocation under the CAISO Tariff or \nCommission-accepted methodology and the project-specific information in \nSchedule 4. No portion assigned to other customers, other facilities, or broader \nregional needs shall be included. Before the Regional Project In-Service Date, any \ncosts of a cancelled or abandoned project shall be treated under the applicable \nCAISO Tariff, Commission order, and any abandoned-plant incentive specifically \nauthorized for that project. This Agreement does not create a separate pre-service \npayment or Construction Security obligation solely because CAISO has assigned a \nregional project share to Large Load Facility. Any pre-service payment, \ncontribution, or security required by the CAISO Tariff, an applicable \nInterconnection Agreement, or another Commission-accepted arrangement remains \ndue under that authority and shall be identified in Schedule 4. Any abandoned-plant \nrecovery, customer payment, or security proceeds shall receive the accounting and \nrate treatment required by the Commission, and any credit necessary to prevent \nduplicate recovery of the same costs shall be recorded in the TRBA and flowed \nthrough to transmission customers through the TRBAA as provided in Section 6.8. \nAny prospective adjustment or reassignment of the share assigned to the Large Load \nFacility shall occur only as provided by the CAISO Tariff or a Commission-\naccepted methodology. Rate base inclusion, depreciation, and other accounting for \nthe underlying project share remain subject to the Formula Rate, the Protocols, and \nthe Commission's Uniform System of Accounts; this Section 6.3.5 governs only the \ncalculation of the Annual MTRC applicable to the Large Load Facility under this \nAgreement. \n6.3.6. CAISO-Assigned Regional Projects Owned by Another Entity. If CAISO \nformally assigns a specific share of a CAISO-Assigned Regional Project to the \nLarge Load Facility and that project is not owned by DesertLink or is not included \nin DesertLink’s Formula Rate, Eligible Customer shall satisfy the assigned share \nunder the CAISO Tariff or enter into and maintain the required arrangement with \nthe project owner or other responsible entity. The arrangement shall address, as \napplicable, payment of assigned costs and revenue responsibility, construction and \ncancellation obligations, security or credit support, invoicing, reconciliation, true-\nup, refund, release, and any required regulatory filing or acceptance. Eligible \nCustomer shall provide DesertLink a copy of the executed arrangement or other \nevidence reasonably sufficient to demonstrate compliance, including the amount and \nbasis of the assigned share, the billing party, payment terms, and required security. \nEligible Customer shall provide the required arrangement or evidence by the \ndeadline specified in Schedule 4, which shall be no later than the earliest applicable \ndeadline under the CAISO Tariff or project-owner arrangement and, where the"},{"page":115,"startToken":45851,"endToken":46317,"text":"23 \n \nassignment is known before construction, before the project owner commences \nconstruction. If CAISO makes the assignment after construction has commenced or \nafter the project enters service, Eligible Customer shall comply within the period \nspecified by CAISO or the project owner and provide evidence to DesertLink \npromptly. Failure to comply is an Event of Default if not cured as provided in \nSection 7.11(c). \nAmounts owed to another project owner are not included in any Annual MTRC, \nRegional Project Allocated ARR, Total Required Revenue Commitment, \nSupplemental MTRC, Cumulative Revenue Responsibility, or TRBAA Credit \nunless the amount is included in DesertLink’s Formula Rate and Schedule 4 \nexpressly identifies it as DesertLink’s assigned share. The applicable tariff or \nproject-owner arrangement shall identify and apply any credits required to prevent \nduplicate recovery of the same assigned share through both a direct charge and a \ntransmission rate. Payments to another owner satisfy only the corresponding \nobligation under that tariff or arrangement and do not reduce the Cumulative \nRevenue Responsibility owed to DesertLink unless they satisfy the same underlying \nobligation included in DesertLink’s Formula Rate. The Eligible Customer’s \nobligations under this Section survive termination of this Agreement and cessation \nof service until the assigned share has been paid or assumed by a successor and the \nobligation has been discharged, transferred, or released under the applicable CAISO \nTariff or project-owner arrangement by the entity entitled to enforce it. \n6.4. \nSupplemental MTRC. Beginning on the in-service date of each Covered Upgrade, \nEligible Customer shall pay the positive shortfall, if any, between the applicable \nAnnual MTRC, prorated for a partial Rate Year based on the number of monthly \nBilling Periods in that Rate Year during which the Covered Upgrade is in service, and \nQualifying Transmission Revenues attributable to the Large Load Facility during the \ncorresponding Rate Year or partial Rate Year. Until the Final MTRC Determination \nDate, billing shall use the Estimated Annual MTRC. Upon initial finalization, the Final \nAnnual MTRC shall apply back to the applicable in-service date, and estimated \ncharges shall be reconciled in the next Reconciliation Statement under Section 6.6. \nThereafter, the calculation shall use the Final Annual MTRC, subject to adjustments \npermitted by Section 6.3.1. Qualifying Transmission Revenues attributable to a \nspecific Covered Upgrade shall be applied to that upgrade. Qualifying Transmission \nRevenues not attributable to a specific Covered Upgrade shall be allocated among the \nCovered Upgrades then in their MTRC Terms pro rata based on their respective \nprorated Annual MTRCs for the applicable period. \nThe calculation may be expressed as: \nSupplemental MTRC = max (applicable Annual MTRC − Qualifying Transmission \nRevenues, $0). \nThe Annual MTRC is not an annual true-up of project cost or Formula Rate inputs. \nAnnual reconciliation is limited to Qualifying Transmission Revenues, Supplemental \nMTRC invoices and receipts, Applied Security Proceeds, TRBAA Credits, partial-year"},{"page":116,"startToken":46317,"endToken":46812,"text":"24 \n \nproration, effective prospective reassignment, and correction of error, fraud, a final \nFERC order applicable to the calculation, and any prospective recalculation of the \nFinal Annual MTRC permitted by Section 6.3.1. \n6.5. \nInvoice. With each Annual Projection, DesertLink shall forecast Qualifying \nTransmission Revenues and calculate the projected Supplemental MTRC using the \napplicable fixed or estimated Annual MTRC from Schedule 5, increased or reduced by \nany prior-period true-up adjustment under Section 6.6. DesertLink shall invoice the \nforecasted Supplemental MTRC for the applicable Rate Year or partial Rate Year in \nequal monthly installments for each Billing Period in that Rate Year during which the \nCovered Upgrade is in service; for a full Rate Year, the projected Supplemental \nMTRC shall be invoiced in twelve (12) equal monthly installments. Each installment \nis payable within thirty (30) Calendar Days after receipt of the invoice. If a Covered \nUpgrade reaches its applicable in-service date during a Rate Year for which the \nAnnual Projection did not include a projected Supplemental MTRC for that Covered \nUpgrade, DesertLink shall promptly forecast Qualifying Transmission Revenues and \ninvoice the prorated Supplemental MTRC for the remaining Billing Periods of that \nRate Year. DesertLink shall include the projected Supplemental MTRC, including any \nprior-period true-up adjustment, as a Forecast TRBAA Credit in the next annual \nTRBAA under Section 6.8. Only cash actually received by DesertLink, or Applied \nSecurity Proceeds actually applied by DesertLink, constitutes an actual receipt for \npurposes of Sections 6.6 through 6.8. Concurrently with each Annual Projection, \nDesertLink shall provide Eligible Customer upgrade-specific workpapers showing the \napplicable Annual MTRC, forecast Qualifying Transmission Revenues, projected \nSupplemental MTRC, any prior-period true-up adjustment, Forecast TRBAA Credit, \nTotal Required Revenue Commitment, and Required Operational Security. \n6.6. \nAnnual Reconciliation Statement. In connection with each Annual Update, \nDesertLink shall determine the actual Supplemental MTRC obligation using actual \nQualifying Transmission Revenues and the applicable fixed or estimated Annual \nMTRC from Schedule 5. DesertLink shall identify, by Eligible Customer and Covered \nUpgrade, the opening unpaid billed Supplemental MTRC balance, Supplemental \nMTRC invoiced during the Rate Year, cash received by DesertLink, Applied Security \nProceeds applied to identified obligations, direct recoveries, closing unpaid billed \nbalance, and each Annual Termination Fee Credit. Concurrently with each Annual \nUpdate, DesertLink shall serve on Eligible Customer a Reconciliation Statement \ncontaining those determinations, the updated Cumulative Revenue Ledger, Required \nOperational Security recalculated under Section 7.4, a reconciliation of the Forecast \nTRBAA Credit to actual amounts recorded in the TRBA, and supporting workpapers. \nAn unpaid Supplemental MTRC remains due from Eligible Customer and, when later \nreceived or satisfied through Applied Security Proceeds, is recorded in the TRBA only \nin the Rate Year of receipt or application. The Reconciliation Statement shall not \nreopen the Final Annual MTRC or Total Required Revenue Commitment except as \nexpressly allowed by Section 6.3.1. \nThe difference between the Supplemental MTRC billed for a Rate Year, excluding any \nprior-period true-up adjustment included in that billing, and the actual Supplemental"},{"page":117,"startToken":46812,"endToken":47307,"text":"25 \n \nMTRC determined in the Reconciliation Statement for that Rate Year shall constitute a \n“prior-period true-up adjustment,” which shall increase (if under-billed) or reduce (if \nover-billed) the projected Supplemental MTRC invoiced under Section 6.5 following \nthe next Annual Projection. If no further Supplemental MTRC will be invoiced under \nthis Agreement, DesertLink shall invoice any under-billed amount, payable within \nthirty (30) Calendar Days after receipt of the invoice, and shall refund any over-billed \namount to Eligible Customer within thirty (30) Calendar Days after service of the \nReconciliation Statement. No interest shall accrue on the Supplemental MTRC or on \nany prior-period true-up adjustment, invoice, refund, or other adjustment of the \nSupplemental MTRC between DesertLink and Eligible Customer. Any refund to \nEligible Customer of an amount previously recorded as a TRBAA Credit shall be \nreversed in the TRBA when paid, and any under-billed amount later received shall be \nrecorded in the TRBA when received, in each case as provided in Section 6.8. Any \namount returned by DesertLink to transmission customers through the TRBAA shall \ninclude interest as provided in Section 5.5 of the TO Tariff. \nA Reconciliation Statement shall become final on the earlier of (a) Eligible \nCustomer’s written acceptance of the Reconciliation Statement or (b) ninety (90) \nCalendar Days after service, unless before that date Eligible Customer serves a Notice \nof Dispute under Section 11.1 identifying with reasonable specificity the items \ndisputed. If a Notice of Dispute is timely served, the undisputed portions of the \nReconciliation Statement shall become final on the date that would otherwise apply, \nand the disputed items shall become final upon the applicable Dispute Determination \nunder Section 11.5. A final Reconciliation Statement may be revised only to \nimplement a Dispute Determination, to reflect CAISO resettlements or other corrected \ndata as provided in Schedule 2, or to correct errors or fraud. Finality of a \nReconciliation Statement under this Agreement does not affect the Commission’s \nreview and approval of any TRBAA. \nFor purposes of this Agreement, Supplemental MTRC Receipts exclude Applied \nSecurity Proceeds. Applied Security Proceeds shall be counted only when DesertLink \napplies such proceeds to satisfy an identified payment obligation and shall reduce that \nobligation dollar-for-dollar. The posting, maintenance, replenishment, drawing, or \nholding of Security shall not, by itself, constitute a Supplemental MTRC Receipt, an \nApplied Security Proceed, satisfaction of the Cumulative Revenue Responsibility, or a \nTRBAA Credit. \nNo amount shall be counted both as a Supplemental MTRC Receipt and as an Applied \nSecurity Proceed. If DesertLink receives payment of an obligation previously satisfied \nthrough Applied Security Proceeds, DesertLink shall not count the subsequent \npayment toward the Cumulative Revenue Responsibility or a TRBAA Credit and shall \ninstead return the duplicative amount, release an equivalent amount of Security, or, \nwith supporting notice to Eligible Customer, apply the amount to another then-\noutstanding obligation under this Agreement. \n6.7. \nCumulative Revenue Responsibility and Break-Even. DesertLink shall maintain a \nCumulative Revenue Ledger for each Covered Upgrade and shall update it at least"},{"page":118,"startToken":47307,"endToken":47702,"text":"26 \n \nannually in connection with the Annual Update. DesertLink shall include an updated \nCumulative Revenue Ledger statement, with supporting workpapers, in each \nReconciliation Statement served on Eligible Customer under Section 6.6. For each \nCovered Upgrade, the Total Required Revenue Commitment equals the Final Annual \nMTRC multiplied by twenty (20), adjusted only for partial-year proration and any \nprospective recalculation of the Final Annual MTRC permitted by Section 6.3.1, \nwhich shall apply only to the Rate Years remaining in the MTRC Term after the \nrecalculation takes effect. Until the Final MTRC Determination Date, the projected \nTotal Required Revenue Commitment shall equal the Estimated Annual MTRC \nmultiplied by twenty (20). \nRemaining Cumulative Revenue Responsibility equals the applicable Total Required \nRevenue Commitment less: \n(a) cumulative Qualifying Transmission Revenues; \n(b) cumulative Supplemental MTRC Receipts; \n(c) cumulative Applied Security Proceeds; \n(d) effective prospective reassignment credits; and \n(e) cash amounts received and applied toward the Termination Fee, excluding any \nportion satisfied through Applied Security Proceeds already counted under \nclause (c). \nEach dollar shall be entered in the Cumulative Revenue Ledger only once. \nSupplemental MTRC Receipts shall exclude Applied Security Proceeds. Applied \nSecurity Proceeds shall be entered only when applied to an identified Supplemental \nMTRC, prior-period true-up adjustment, Termination Fee, or other payment obligation \nunder Article 6 or Section 3.3.4. Security that is posted, drawn but not applied, held as \na deferred liability, replenished, replaced, or returned shall not reduce the Cumulative \nRevenue Responsibility. Annual Termination Fee Credits and the corresponding \nTermination Fee Balance shall be separately identified in the Reconciliation Statement \nand in the workpapers required under Section 6.8 and shall not again reduce the \nCumulative Revenue Responsibility. \nIf an amount previously credited in the Cumulative Revenue Ledger is subsequently \nrefunded, reversed, disallowed, or otherwise ceases to satisfy the applicable obligation, \nDesertLink shall make a corresponding adjustment to the ledger, subject to the finality \nand no-revival provisions of this Section. \nCancellation, downsizing, curtailment, or departure does not extinguish the remaining \nresponsibility. When a final Reconciliation Statement determines that the \nresponsibility has reached zero (“Break-Even”), DesertLink shall terminate the \noperational payment and Security obligations and release any excess Security. Once \nfinally satisfied, the responsibility shall not revive because of a later change in ROE, \nexpense, load, forecast, or other Formula Rate input, subject only to final true-ups and \ncorrection of errors or fraud for periods before satisfaction."},{"page":119,"startToken":47702,"endToken":48239,"text":"27 \n \n6.8. \nTRBAA Credit and No Double Recovery. Supplemental MTRC Receipts, Applied \nSecurity Proceeds other than Applied Security Proceeds applied to a Termination Fee, \nAnnual Termination Fee Credits, and any duplicate-recovery credit under Section \n3.3.3(d) or Section 6.3.5 shall be credited to transmission customers solely through the \nTRBAA and shall not be recorded as revenue credits in, or otherwise included as \ninputs to, the Formula Rate. In each annual TRBAA, DesertLink shall include as the \nForecast TRBAA Credit: (a) the projected Supplemental MTRC for the following Rate \nYear, increased or reduced by any prior-period true-up adjustment invoiced under \nSection 6.5; and (b) for any Covered Upgrade with a Termination Fee Balance, the \nAnnual Termination Fee Credit scheduled under Section 3.3.4 for the following Rate \nYear, prorated as applicable and limited to the available Termination Fee Balance. \nDesertLink shall record in the TRBA only Supplemental MTRC cash receipts, Applied \nSecurity Proceeds other than Applied Security Proceeds applied to a Termination Fee, \nand Annual Termination Fee Credits actually received, applied, or scheduled for the \napplicable Rate Year, respectively. Applied Security Proceeds applied to a \nTermination Fee shall be deposited into and held in the Termination Fee Account \nunder Section 3.3.4 and shall be credited to transmission customers solely through the \napplicable Annual Termination Fee Credits. The difference between the Forecast \nTRBAA Credit and those actual amounts shall be reflected in the principal balance of \nthe TRBA and flowed through to transmission customers in a subsequent TRBAA. A \nbilled but unpaid Supplemental MTRC is not a TRBAA Credit. A later Supplemental \nMTRC Receipt or Applied Security Proceeds, other than Applied Security Proceeds \napplied to a Termination Fee, shall be recorded only in the Rate Year in which it is \nreceived or applied, respectively. Any amount previously recorded as a TRBAA Credit \nthat is later refunded, reversed, or otherwise ceases to satisfy the applicable obligation \nshall be reversed in the TRBA when refunded or reversed. Interest on the TRBA \nbalance shall be calculated as provided in Section 5.5 of the TO Tariff. Qualifying \nTransmission Revenues shall not be included again as a TRBAA Credit because they \nare already reflected in calculating the Supplemental MTRC. \nEach dollar shall be included in a TRBAA Credit only once. Applied Security \nProceeds shall not also be treated as Supplemental MTRC Receipts, and the posting, \ndrawing, holding, replenishment, replacement, or return of Security shall not \nindependently produce a TRBAA Credit. A Forecast TRBAA Credit applies only to \nthe forecast Rate Year and shall be reconciled through the TRBA to actual \nSupplemental MTRC Receipts, Applied Security Proceeds other than those applied to \na Termination Fee, and Annual Termination Fee Credits, as applicable. \nDesertLink shall maintain workpapers reconciling each Forecast TRBAA Credit and \neach amount recorded in the TRBA under this Section 6.8 to the applicable Annual \nMTRC calculation in Schedule 5, forecast and actual Qualifying Transmission \nRevenues, opening unpaid billed balance, Supplemental MTRC invoiced, prior-period \ntrue-up adjustment, Supplemental MTRC cash receipt, Applied Security Proceed, \ndirect recovery, closing unpaid billed balance, Termination Fee Balance, Annual \nTermination Fee Credit, resulting forecast-to-actual TRBA difference, Rate Year, \nLarge Load Customer, and Covered Upgrade. DesertLink shall include with each"},{"page":120,"startToken":48239,"endToken":48657,"text":"28 \n \nTRBAA filing workpapers sufficient to permit transmission customers to verify the \nTRBAA Credits reflected in that TRBAA, which may present customer-specific \ninformation on an aggregated basis or be submitted subject to a request for privileged \ntreatment under 18 C.F.R. § 388.112 or other appropriate confidentiality protections. \n6.9. \nProspective Reassignment of Revenue Responsibility.  \n6.9.1. Eligibility for Reassignment of Revenue Responsibility. Whether or not the \nLarge Load Customer remains in service, a portion of the prospective revenue \nresponsibility associated with a Large Load-Driven Upgrade may be reassigned to a \nsubsequent load customer if an objective transmission study conducted under the \napplicable tariff or study process determines that: \n(a) the subsequent large load customer relies upon identifiable incremental \ncapability created by the Large Load-Driven Upgrade; and \n(b) that reliance avoids or reduces identifiable transmission upgrades that \notherwise would have been required to provide the subsequent large load \ncustomer’s requested service. \nIncidental power flows, generalized system benefits, or use of the transmission \nsystem that does not satisfy both requirements shall not support a reassignment. \nThis Section 6.9 applies only to a load customer other than the Large Load \nCustomer, at a facility other than the Large Load Facility. It does not apply to a \ntransfer of ownership or operation of the Large Load Facility, a change in Eligible \nCustomer, or an assignment of this Agreement, which are governed by Sections \n6.10 and 10.1 and do not alter the Applicable Allocation Percentage or the Large \nLoad-Driven Upgrades attributable to the Large Load Facility. \n6.9.2. Reassignment Calculation. DesertLink shall determine the prospective \nreassignment separately for each Large Load-Driven Upgrade satisfying Section \n6.9.1 (each, a “Shared Upgrade”). For each Shared Upgrade: \n(a) the Demonstrated Avoided Upgrade Cost shall equal the reasonable \nestimated cost of the transmission upgrades that would have been required \nfor the subsequent large load customer absent the Shared Upgrade, less the \nreasonable estimated cost of any additional transmission upgrades required \nwhen the capability of the Shared Upgrade is considered; \n(b) the Remaining Allocated Net Plant shall equal the portion of the Shared \nUpgrade’s net plant balance included in rate base immediately before the \nreassignment that remains assigned to the Large Load Customer under this \nAgreement; \n(c) the Capability-Supported Amount shall equal the portion of the Remaining \nAllocated Net Plant reasonably attributable to the incremental capability of \nthe Shared Upgrade actually relied upon by the subsequent large load \ncustomer; and \n(d) the Reassigned Investment Amount shall equal the least of:"},{"page":121,"startToken":48657,"endToken":49035,"text":"29 \n \n(i) the Demonstrated Avoided Upgrade Cost; \n(ii) the Capability-Supported Amount; and \n(iii) the Remaining Allocated Net Plant. \nThe Demonstrated Avoided Upgrade Cost, Capability-Supported Amount, and \nRemaining Allocated Net Plant shall be determined using a consistent cost basis and \nprice year. If Remaining Allocated Net Plant is greater than zero, the Reassignment \nPercentage shall equal the Reassigned Investment Amount divided by the \nRemaining Allocated Net Plant, bounded between zero and one hundred percent \n(100%). If Remaining Allocated Net Plant is zero or negative, no Reassignment \nPercentage shall be calculated under this methodology; any reassignment shall \nrequire an applicable tariff methodology or Commission determination addressing \nthat circumstance. \n6.9.3. Prospective Adjustment of Revenue Responsibility. Beginning on the \nReassignment Effective Date, the applicable Annual MTRC assigned to the Large \nLoad Customer shall be prospectively reduced by the Reassignment Percentage \napplied to the Shared Upgrade. DesertLink shall record a separate effective \nprospective reassignment credit in the Cumulative Revenue Ledger equal to the \nReassignment Percentage multiplied by the Remaining Cumulative Revenue \nResponsibility associated with the Shared Upgrade that remains assigned to the \nLarge Load Customer immediately before the Reassignment Effective Date. That \ncredit shall be the sole Cumulative Revenue Ledger adjustment for the reassigned \nresponsibility. It shall not adjust the Total Required Revenue Commitment or result \nin a second reduction to the Remaining Cumulative Revenue Responsibility or \nRequired Operational Security for the same reassigned responsibility. \nDesertLink shall recalculate the Supplemental MTRC and Operational Security \nunder this Agreement to reflect the reassignment. The Reassignment Effective Date \nshall be the latest of: \n(a) the date the subsequent large load customer commences the service for \nwhich the Shared Upgrade provides the identified incremental capability; \n(b) the effective date of a cost recovery agreement establishing the subsequent \nlarge load customer’s corresponding revenue responsibility; \n(c) the date on which all Security required from the eligible customer serving \nthe subsequent large load customer becomes effective; and \n(d) the date on which the study and any other approvals required under the \napplicable tariff become final. \nNo reduction in the Large Load Customer’s Operational Security shall occur until \nthe corresponding responsibility and required Security have become effective for the \nsubsequent large load customer. \n6.9.4. Prospective Treatment and Prevention of Duplicate Reassignment. A \nreassignment under this Section shall:"},{"page":122,"startToken":49035,"endToken":49503,"text":"30 \n \n(a) operate prospectively only and shall not produce a refund, credit, or \nreopening of amounts properly determined for a prior Rate Year; \n(b) transfer prospective revenue responsibility only and shall not constitute a \nsale or transfer of transmission facilities, a transfer of plant ownership, a \nchange in plant accounting, or a modification of any CAISO cost allocation; \n(c) not exceed the prospective responsibility remaining under this Agreement \nfor the Shared Upgrade; and \n(d) not assign the same transmission capability, avoided upgrade cost, Annual \nMTRC, or Cumulative Revenue Responsibility to more than one large load \ncustomer. \nDesertLink shall maintain an upgrade-specific reassignment ledger identifying the \ncapability and responsibility assigned to each large load customer. Once \nresponsibility has been effectively reassigned, that responsibility shall not revert to \nthe Large Load Customer if the subsequent large load customer later terminates, \nreduces, or fails to commence service. The reassigned responsibility shall instead \nremain with the subsequent large load customer and the Eligible Customer \nresponsible for its payment, subject to any further prospective reassignment \npermitted under the applicable agreement and tariff. \nAny prospective reassignment, adjustment, or change in the cost share of a CAISO-\nAssigned Regional Project shall be recognized under this Agreement only to the \nextent authorized or required by the CAISO Tariff or a Commission-accepted \nmethodology. DesertLink shall apply an effective change prospectively to the \nRegional Project Allocated ARR, Cumulative Revenue Responsibility, \nSupplemental MTRC, TRBAA Credit, and Operational Security, and shall update \nSchedule 4 and the applicable workpapers. The change shall not assign the same \nproject share to more than one customer or alter costs allocated to other customers \nunder the CAISO Tariff. \n6.10. Change in Eligible Customer. Cost responsibility is assigned to the Large Load \nCustomer and Large Load Facility, as paid by the Eligible Customer then taking \nwholesale transmission service on behalf of the Large Load Customer and Large Load \nFacility. If the Eligible Customer serving a Large Load Customer or Large Load \nFacility changes, the Successor Eligible Customer must execute an assumption \nagreement covering the Cumulative Revenue Responsibility and any outstanding \nobligations under Section 6.3.6, provide required Security, and become responsible on \na date coordinated with CAISO billing before the prior Eligible Customer is released. \nFollowing the complete departure of the Large Load Customer, the last responsible \nEligible Customer remains obligated unless responsibility is transferred under an \napplicable tariff or state-law mechanism, assumed by a successor, or prospectively \nreassigned as permitted under this Agreement and the CAISO Requirements. If \nownership or operation of the Large Load Facility is transferred, Eligible Customer \nshall notify DesertLink within thirty (30) Calendar Days and shall cause the transferee \nto execute a Limited Acknowledgment in the form attached to this Agreement. The \ntransfer shall not alter the Applicable Allocation Percentage, Cumulative Revenue \nResponsibility, or Security obligations under this Agreement."},{"page":123,"startToken":49503,"endToken":49952,"text":"31 \n \nA sale, lease, or other transfer of the Large Load Facility, or of the Large Load \nCustomer’s interest in such Large Load Facility, is not a reassignment under Section \n6.9 and does not require a study under Section 6.9.1. Cost responsibility shall continue \nto follow the Large Load Facility, the transferee shall execute a Limited \nAcknowledgment substantially in the form included in this Agreement, and Eligible \nCustomer shall remain responsible for its obligations under this Agreement unless they \nare transferred to a Successor Eligible Customer under this Section 6.10. \n6.11. CAISO Data and Settlement Coordination. Eligible Customer shall provide \nDesertLink, or authorize and direct its Scheduling Coordinator, Utility Distribution \nCompany, Metering Coordinator, and other applicable entities to provide DesertLink, \nwith the metering, settlement, billing, resettlement, allocation, and other data \nreasonably necessary to calculate and verify Qualifying Transmission Revenues and \nadminister this Agreement. Eligible Customer shall execute any authorization or data-\nrelease documentation reasonably necessary for DesertLink to obtain such \ninformation. \nTo the extent authorized or required by the CAISO Tariff, CAISO may provide or \nmake available relevant settlement, metering, billing, resettlement, and allocation data \nas provided under the CAISO Requirements. Nothing in this Agreement, however, \nimposes an obligation on CAISO or makes CAISO a party to this Agreement. \nDesertLink and Eligible Customer shall cooperate with CAISO and other applicable \nentities to establish and maintain the billing identifiers, metering points, data \nexchanges, and authorizations identified in Schedule 2. \nDesertLink shall calculate Qualifying Transmission Revenues, the Annual MTRC, and \nthe Supplemental MTRC; maintain the Cumulative Revenue Ledger; and serve on \nEligible Customer the Reconciliation Statement, including the Cumulative Revenue \nLedger statement, required by Sections 6.6 and 6.7. \nIf final data are not available when a calculation is required, DesertLink may use \nreasonable estimates based on the best information then available, subject to \nreconciliation under Section 6.6 when final or corrected data become available. \n6.12. Information Rights and Confidentiality. Upon reasonable request, DesertLink shall \nprovide Eligible Customer the workpapers, data, and other information reasonably \nnecessary to verify the identification of Large Load-Driven Upgrades and CAISO-\nAssigned Regional Projects and all calculations of each Annual MTRC, Regional \nProject Allocated ARR, Total Required Revenue Commitment, Qualifying \nTransmission Revenues, Supplemental MTRC, Cumulative Revenue Responsibility, \nTRBAA Credits, reassignment, and Security under this Agreement. Any dispute \nconcerning those matters shall be resolved under Article 11. Large Load Customer and \nany Successor Eligible Customer may participate in a dispute under Article 11 to the \nextent the dispute affects its obligations under this Agreement or its Limited \nAcknowledgment. Customer-specific information shall be protected under Section \n16.3 of the TO Tariff, the CAISO Tariff, and any applicable confidentiality agreement."},{"page":124,"startToken":49952,"endToken":50372,"text":"32 \n \n7. Security and Payment Obligations \n7.1. \nConstruction Security. Before an applicable Large Load-Driven Upgrade reaches its \nUpgrade In-Service Date, Eligible Customer shall maintain Construction Security \nunder the relevant agreement sufficient to secure: \n(a) DesertLink’s incurred and irrevocably committed engineering, design, \nprocurement, permitting, construction, testing, and related costs attributable \nto that upgrade; and \n(b) the Pre-In-Service Termination Costs described in Section 3.3.2, including \nproperly accrued AFUDC and applicable cancellation, demobilization, \nequipment removal, disposition, remediation, and restoration costs \n(“Construction Security”).  \nConstruction Security secures, but does not limit, Eligible Customer’s liability for \nthose amounts. Construction Security provided under the relevant Interconnection \nAgreement or an engineering and procurement agreement for the same costs shall \ncount toward, and shall not be duplicated by, the Construction Security required under \nthis Agreement. Construction Security shall remain in effect for each Large Load-\nDriven Upgrade until that upgrade reaches its Upgrade In-Service Date and the \napplicable release or conversion conditions in Section 7.2 are satisfied. \nA Large Load-Driven Upgrade reaching its Upgrade In-Service Date shall not result in \nthe release of Construction Security attributable to another Large Load-Driven \nUpgrade that has not reached its Upgrade In-Service Date. Eligible Customer shall \nreplenish Construction Security within ten (10) Business Days after notice of a \npermitted draw and supporting information if additional secured obligations remain \nand the remaining Construction Security is less than the amount required under this \nSection. \nFor a CAISO-Assigned Regional Project owned by DesertLink, any pre-service \npayment, contribution, or security required from Eligible Customer for its formally \nassigned share shall be provided only as required by the CAISO Tariff, an applicable \nInterconnection Agreement, or another Commission-accepted arrangement, and shall \nbe identified in Schedule 4. This Agreement does not independently require pre-\nservice Construction Security solely because CAISO has assigned a share of a regional \nproject to the Large Load Facility. The treatment of costs for a cancelled or abandoned \nregional project shall be governed by Section 6.3.5 and the applicable Commission \norder, CAISO Tariff, and any project-specific abandoned-plant incentive authorized by \nthe Commission. For a project owned by another entity, construction and operational \nsecurity shall be provided under the CAISO Tariff or the arrangement required by \nSection 6.3.6 and Schedule 4; it shall not be treated as DesertLink Operational \nSecurity unless included in DesertLink’s Formula Rate and expressly identified as \nDesertLink’s share. \n7.2. \nDelivery of Operational Security. No later than thirty (30) Calendar Days before the \nearliest expected Upgrade In-Service Date identified in Schedule 1 or Regional Project"},{"page":125,"startToken":50372,"endToken":50794,"text":"33 \n \nIn-Service Date identified in Schedule 4 for a DesertLink-owned CAISO-Assigned \nRegional Project, Eligible Customer shall deliver Operational Security calculated \nunder this Article for the Large Load-Driven Upgrades and DesertLink-owned \nCAISO-Assigned Regional Project expected to enter service. Operational Security \nmust be fully effective before any applicable Upgrade In-Service Date or Regional \nProject In-Service Date.  \nIf different Large Load-Driven Upgrades or DesertLink-owned CAISO-Assigned \nRegional Projects are expected to reach their applicable in-service dates on different \ndates, DesertLink shall recalculate the Required Operational Security before each \nsubsequent in-service date to include the additional Cumulative Revenue \nResponsibility attributable to the upgrade or project share entering service. Eligible \nCustomer shall provide any resulting increase no later than fifteen (15) Business Days \nafter receipt of a Security Notice, or by the applicable in-service date if earlier. \nInclusion of pre-service Construction Work in Progress in rate base shall not constitute \nan Upgrade In-Service Date or independently trigger the Operational Security \nrequirement. Construction Security shall remain applicable to each Large Load-Driven \nUpgrade that has not reached its Upgrade In-Service Date. \nNo Construction Security attributable to a Large Load-Driven Upgrade shall be \nreleased or converted unless:  \n(a) the Required Operational Security attributable to that upgrade is effective; \n(b) that upgrade has reached its Upgrade In-Service Date; and \n(c) DesertLink has determined that all Pre-In-Service Termination Costs and \nother construction-related obligations attributable to that upgrade have been \npaid or adequately reserved for. \nAny portion of Construction Security retained for unresolved construction costs shall \nbe released after DesertLink determines that those costs have been paid or adequately \nreserved for or, if Section 3.3.2 applies, after the Termination Cost Reconciliation \nbecomes final. Failure to timely deliver Required Operational Security is a default \npermitting DesertLink, to the extent authorized by the applicable tariffs and \nagreements, to suspend energization or service, terminate applicable interconnection \narrangements, and draw Construction Security for secured obligations.  \n7.3. \nRequired Operational Security. Required Operational Security shall equal one \nhundred percent (100%) of the nominal Remaining Cumulative Revenue \nResponsibility. DesertLink shall reduce that amount only by the portion of Qualifying \nRetail Security Support identified in a currently effective Retail Security Certification. \nA Retail Security Certification is accepted in reliance on Eligible Customer’s \nrepresentations and does not require DesertLink to review the underlying retail-\nsecurity documents in the ordinary course. If DesertLink has a reasonable basis to \nquestion the certification, or after a payment default, Credit Review Event, or Material \nAdverse Credit Event, DesertLink may request supporting information reasonably \nnecessary to verify continued compliance. Any resulting deficiency shall be delivered"},{"page":126,"startToken":50794,"endToken":51276,"text":"34 \n \nor restored within fifteen (15) Business Days after receipt of a Security Notice, or by \nthe applicable in-service date if earlier. \n7.4. \nAnnual Resizing and Security Notices. DesertLink shall recalculate Required \nOperational Security with each Annual Projection, Final MTRC Determination Date, \nrecalculation of a Final Annual MTRC under Section 6.3.1, Reconciliation Statement, \neffective prospective reassignment, replacement or expiration of Qualifying Retail \nSecurity Support, or Credit Review Event. If DesertLink reasonably determines that \nthe Required Security Amount exceeds available Security, it may issue a Security \nNotice identifying the required increase or restoration and reasonable supporting detail \nthen available. Eligible Customer shall provide the required increase or restoration \nwithin fifteen (15) Business Days after receipt of the Security Notice, or by the \napplicable in-service date if earlier. A reduction shall be released only after the \nrelevant calculation and reconciliation are final. \n7.5. \nForm of Operational Security. Except to the extent of currently effective Qualifying \nRetail Security Support, Eligible Customer shall provide direct Operational Security in \nthe form of cash, an irrevocable standby Letter of Credit meeting Schedule 3, or any \ncombination of cash and Letter of Credit. DesertLink may accept another form of \nSecurity that it determines, in its sole discretion, is acceptable. \nEach Letter of Credit shall have an initial stated term of at least twelve (12) months \nand shall remain continuously effective until released under this Agreement; provided, \nhowever, that a Letter of Credit may have a stated expiration date before its release \ndate if Eligible Customer timely extends or replaces it so that Security in an amount \nnot less than the Required Security Amount remains continuously available to \nDesertLink.  \nIf an issuing bank has the right not to renew a Letter of Credit, the Letter of Credit \nshall require the issuing bank to provide DesertLink and Eligible Customer at least \nninety (90) Calendar Days’ prior written notice of nonrenewal. Eligible Customer shall \nprovide a conforming extension or replacement Letter of Credit, or additional cash \ncollateral or other Security accepted by DesertLink, no later than sixty (60) Calendar \nDays before the applicable expiration date.   \nIf Eligible Customer fails to provide the required extension, replacement, or other \nSecurity by that deadline, DesertLink may, before the Letter of Credit expires, draw all \nor any portion of the then-available amount under the Letter of Credit and retain the \nproceeds as cash collateral, apply the proceeds to secured obligations, or both. Any \nproceeds retained but not applied shall continue to constitute Security until released \nunder this Agreement. \n7.6. \nDraw and Application. DesertLink may draw against all or any portion of a Letter of \nCredit, apply cash collateral, or apply another form of Security accepted by \nDesertLink to secured obligations upon: (a) an unpaid Supplemental MTRC, true-up, \nTermination Fee, or other amount due after the applicable payment period; (b) Eligible \nCustomer’s failure to timely deliver, maintain, replace, restore, or increase Security;"},{"page":127,"startToken":51276,"endToken":51782,"text":"35 \n \n(c) cancellation, termination, withdrawal, abandonment, or permanent cessation of the \nLarge Load Facility or a material breach of this Agreement; (d) a material inaccuracy \nin a Retail Security Certification or Security instrument; (e) Eligible Customer: (i) files \na voluntary petition in bankruptcy or seeks reorganization, arrangement, or similar \nrelief under any bankruptcy, insolvency, or debtor-relief law; (ii) becomes subject to \nan involuntary bankruptcy or insolvency proceeding that is not dismissed within sixty \n(60) Calendar Days; (iii) has a receiver, trustee, liquidator, or custodian appointed for \nit or a substantial portion of its assets, which appointment is not vacated within sixty \n(60) Calendar Days; (iv) makes a general assignment for the benefit of creditors; or (v) \nadmits in writing its inability to pay debts as they become due; or (f) Eligible \nCustomer fails to extend, replace, or otherwise maintain Security in the amount and \nwithin the time required by Section 7.5, including following a notice of nonrenewal, \nissuer rating reduction, or other event affecting the availability of a Letter of Credit. \nA draw shall not automatically require replenishment to the amount maintained \nimmediately before the draw. Following any application of drawn proceeds to an \namount due, DesertLink shall recalculate the remaining Cumulative Revenue \nResponsibility and the Operational Security then required under this Article. Eligible \nCustomer shall replenish only the amount, if any, by which the remaining Operational \nSecurity is less than the recalculated Required Security Amount, within fifteen (15) \nBusiness Days after receipt of a Security Notice, or by the applicable in-service date if \nearlier. \nProceeds drawn solely to prevent the expiration or nonrenewal of a Letter of Credit, \nand cash collateral not yet applied to an identified payment obligation, shall remain \nrefundable Security and shall continue to constitute Operational Security until applied \nto an amount then due or released under Section 7.9. Such proceeds and cash collateral \nshall be included in determining the amount of remaining Operational Security and \nshall not create an additional replenishment obligation merely because they are held by \nDesertLink. \nThe posting, drawing, holding, replacement, or replenishment of Operational Security \nshall not, by itself, satisfy the secured obligation, reduce Cumulative Revenue \nResponsibility, or produce a TRBAA Credit. Drawn proceeds of Operational Security \nshall become Applied Security Proceeds only when DesertLink applies them to an \nidentified Supplemental MTRC, prior-period true-up adjustment, Termination Fee, or \nother secured payment obligation arising under Article 6 or Section 3.3.4. Upon \napplication, the proceeds shall reduce that obligation dollar-for-dollar and shall receive \nthe TRBAA treatment required by Section 6.8; provided, however, that Applied \nSecurity Proceeds applied to a Termination Fee shall be administered under Section \n3.3.4 and credited to transmission customer only through the Annual Termination Fee \nCredits provided under Section 6.8. Proceeds of Construction Security applied to Pre-\nIn-Service Termination Costs or other construction-related obligations shall be treated \nas provided in Sections 3.3.2 and 3.3.3. \n7.7. \nSecurity Maintenance. Because Required Operational Security is initially one \nhundred percent (100%) of nominal Remaining Cumulative Revenue Responsibility,"},{"page":128,"startToken":51782,"endToken":52240,"text":"36 \n \nno separate acceleration concept applies. An incorrect, expired, withdrawn, \nunavailable, or materially misleading Retail Security Certification, or the loss of \nenforceable retail-security rights described in it, is a Material Adverse Credit Event. \nEligible Customer shall provide replacement direct Security for any resulting \nuncovered amount within fifteen (15) Business Days after receipt of a Security Notice, \nor by the applicable in-service date if earlier. \n7.8. \nPost-Termination Administration and Cash Collateral. DesertLink shall continue \nthe annual calculations, invoices, and true-ups required under this Agreement \nfollowing termination of service to, or the departure, permanent cessation, or material \nreduction of service by, the Large Load Customer until the Cumulative Revenue \nResponsibility and all other obligations under this Agreement have been finally \nsatisfied, transferred, reassigned, refunded, or otherwise resolved. The Parties intend \nthat cash collateral and proceeds of Security be treated as a deposit or deferred liability \nrather than as a Contribution in Aid of Construction, customer financing of \ntransmission plant, or a reduction to DesertLink’s rate base. To the extent permitted by \napplicable Commission accounting and ratemaking requirements and tax law, \nDesertLink shall record and administer such amounts as the corresponding annual \ncosts and payment obligations arise. The treatment described in this Section is subject \nto the Commission’s Uniform System of Accounts, the Formula Rate, the Protocols, \napplicable Commission orders, and other Applicable Laws and Regulations. If the \nCommission requires a different accounting or ratemaking treatment, DesertLink shall \nimplement the required treatment and make corresponding adjustments necessary to \nprevent duplicate recovery and preserve, to the extent permitted, the economic \nallocation established by this Agreement. The Parties shall cooperate in seeking any \nnecessary Commission authorization or acceptance.  \nNothing in this Agreement guarantees a particular accounting, ratemaking, or tax \nresult. Cash collateral and unapplied Security proceeds shall remain subject to release \nunder Section 7.9, including release to reflect an effective prospective reassignment \nunder Section 6.9. \n7.9. \nRelease of Security. DesertLink shall release excess Operational Security only after \nthe applicable Reconciliation Statement becomes final. DesertLink shall release \nSecurity attributable to an effective prospective reassignment and shall release all \nremaining Security within thirty (30) Calendar Days after final satisfaction of the \nCumulative Revenue Responsibility and all other secured obligations. Termination \nalone does not require release. \n7.10. Security Does Not Limit Liability. The Required Security Amount is based on \nDesertLink’s then-current estimates and calculations and does not cap, replace, or \ndischarge Eligible Customer’s underlying obligations. A shortfall between Security \nand the amount due remains immediately payable to DesertLink. \n7.11. Events of Default; Remedies. Each of the following is an “Event of Default” by \nEligible Customer: (a) failure to pay any undisputed amount when due that continues \nfor ten (10) Business Days after written notice from DesertLink; (b) failure to deliver,"},{"page":129,"startToken":52240,"endToken":52728,"text":"37 \n \nmaintain, replace, restore, or increase Security when required under this Article 7 or \nSchedule 3 that continues after the applicable cure period; (c) any other material \nbreach of this Agreement, including under Section 4.2 or 6.3.6, that continues for \nthirty (30) Calendar Days after written notice from DesertLink or, if the breach cannot \nreasonably be cured within that period, for such longer period, not to exceed ninety \n(90) Calendar Days, as Eligible Customer diligently pursues a cure; and (d) any event \ndescribed in Section 7.6(e). Upon an Event of Default, DesertLink may, subject to \nApplicable Laws and Regulations and the applicable tariffs and agreements: (i) draw \nand apply Security under Section 7.6; (ii) exercise the rights described in Sections \n4.2.6 and 7.2; (iii) before the first Upgrade In-Service Date or Regional Project In-\nService Date, terminate this Agreement under Section 3.3.1; and (iv) pursue any other \nremedy available at law or in equity or before the Commission. No termination after \nan Upgrade In-Service Date or Regional Project In-Service Date releases the \nobligations described in Section 3.3.4. \n8. Force Majeure. \n8.1. \nIf a Party is rendered unable, wholly or in part, by Force Majeure to carry out a \nnonmonetary obligation, that obligation shall be suspended only to the extent and for \nthe period performance is prevented. Force Majeure does not suspend or excuse \npayment of incurred construction costs, Pre-In-Service Termination Costs, \nSupplemental MTRC, the Termination Fee, prior-period true-up adjustments, or the \nmaintenance, replacement, replenishment, or increase of Security. If a Force Majeure \nevent continues for more than twenty (20) Calendar Days in a sixty (60)-Calendar Day \nperiod, the Parties shall meet to address performance; any resulting termination \nremains subject to Sections 3.4 and 3.5.  \n9. Indemnification  \n9.1. \nIndemnity. Each Party (the “Indemnifying Party”) shall at all times indemnify, \ndefend, and hold the other Party and its Affiliates and their respective directors, \nofficers, employees, and agents (each, an “Indemnified Person”) harmless from any \nand all damages, losses, claims, including claims and actions relating to injury to or \ndeath of any person or damage to property, demand, suits, recoveries, costs and \nexpenses, court costs, attorney fees, and all other obligations by or to third parties, \narising out of or resulting from the Indemnifying Party’s actions or omissions in \nperforming its obligations under this Agreement, except to the extent caused by the \ngross negligence or willful misconduct of the Indemnified Person. \n9.1.1. \nIndemnified Person. If an Indemnified Person is entitled to indemnification as a \nresult of a claim by a third party, and the Indemnifying Party fails, after notice \nand reasonable opportunity to proceed, to assume the defense of such claim, such \nIndemnified Person may at the expense of the Indemnifying Party contest, settle \nor consent to the entry of any judgment with respect to, or pay in full, such \nclaim."},{"page":130,"startToken":52728,"endToken":53227,"text":"38 \n \n9.1.2. \nIndemnifying Party. If an Indemnifying Party is obligated to indemnify and \nhold any Indemnified Person harmless, the amount owing to the Indemnified \nPerson shall be the amount of such Indemnified Person’s actual loss, net of any \ninsurance or other recovery. \n9.2. \nIndemnity Procedures. Promptly after receipt by an Indemnified Person of any claim \nor notice of the commencement of any action or administrative or legal proceeding or \ninvestigation as to which the indemnity provided for in Section 9.1 may apply, the \nIndemnified Person shall notify the Indemnifying Party of such fact. Any failure of or \ndelay in such notification shall not affect a Party’s indemnification obligation unless \nsuch failure or delay is materially prejudicial to the Indemnifying Party. \nThe Indemnifying Party shall have the right to assume the defense thereof with \ncounsel designated by such Indemnifying Party and reasonably satisfactory to the \nIndemnified Person. If the defendants in any such action include one or more \nIndemnified Persons and the Indemnifying Party and if the Indemnified Person \nreasonably concludes that there may be legal defenses available to it and/or other \nIndemnified Persons which are different from or additional to those available to the \nIndemnifying Party, the Indemnified Person shall have the right to select separate \ncounsel to assert such legal defenses and to otherwise participate in the defense of \nsuch action on its own behalf. In such instances, the Indemnifying Party shall only be \nrequired to pay the fees and expenses of one additional attorney to represent an \nIndemnified Person or Indemnified Persons having such differing or additional legal \ndefenses. \nThe Indemnified Person shall be entitled, at its expense, to participate in any such \naction, suit or proceeding, the defense of which has been assumed by the Indemnifying \nParty. Notwithstanding the foregoing, the Indemnifying Party (i) shall not be entitled \nto assume and control the defense of any such action, suit or proceedings if and to the \nextent that, in the opinion of the Indemnified Person and its counsel, such action, suit \nor proceeding involves the potential imposition of criminal liability on the Indemnified \nPerson, or there exists a conflict or adversity of interest between the Indemnified \nPerson and the Indemnifying Party, in which event the Indemnifying Party shall pay \nthe reasonable expenses of the Indemnified Person, and (ii) shall not settle or consent \nto the entry of any judgment in any action, suit or proceeding without the consent of \nthe Indemnified Person, which shall not be unreasonably withheld, conditioned or \ndelayed. \n9.3. \nConsequential Damages. Except for amounts expressly payable under Articles 3, 4, \n6, and 7, no Party shall be liable under this Agreement for special, indirect, incidental, \nconsequential, or punitive damages, including lost profit or revenue, loss of use, cost \nof capital, or temporary equipment or services, under any theory of liability. Amounts \nrequired to satisfy the Cumulative Revenue Responsibility, Supplemental MTRC, \nconstruction costs, prior-period true-up adjustments, and Security obligations are \ndirect contractual payment obligations and are not excluded damages."},{"page":131,"startToken":53227,"endToken":53707,"text":"39 \n \n10. Assignment \n10.1. Except for a change in Eligible Customer governed by Section 6.10, a Party may \nassign this Agreement only with the other Party’s written consent; provided that a \nParty may assign to an Affiliate with equal or greater creditworthiness and legal and \noperational capacity to perform. No assignment or change in retail service provider \nreleases the existing Eligible Customer until the assignee or Successor Eligible \nCustomer executes the required assumption, provides required Security, and the \ntransfer becomes effective under the applicable tariffs. Any prohibited assignment is \nvoid, and Security provided by or on behalf of Large Load Customer does not make \nLarge Load Customer the wholesale obligor.  \n11. Disputes \nAll disputes, claims, or controversies arising out of or relating to this Agreement, including \nany dispute concerning the identification or allocation of Large Load-Driven Upgrades or \nCovered Upgrades; any calculation, update, or recalculation of an Estimated Annual MTRC, \nFinal Annual MTRC, Regional Project Allocated ARR, or the MTRC Calculation Template; \nQualifying Transmission Revenues; Supplemental MTRC; Total Required Revenue \nCommitment; Cumulative Revenue Responsibility; TRBAA Credits; Pre-In-Service \nTermination Costs; the Termination Fee; prospective reassignment; or Security, shall be \nresolved under this Article 11, except that a dispute concerning CAISO’s designation of a \nregional project or assignment of a project cost share shall be resolved under the applicable \nCAISO Tariff procedures. Any payment, refund, credit, or other adjustment resulting from the \nresolution of a dispute under this Article 11 shall be implemented as provided in Section 11.5. \n11.1. Submission and Informal Resolution. In the event of a dispute or claim arising out \nof or relating to this Agreement, the disputing Party shall provide the other Party with \na written notice describing the dispute (“Notice of Dispute”). The dispute shall be \nreferred promptly to designated senior representatives for informal resolution. The \nrepresentatives shall meet or confer within ten (10) Business Days and shall use \nreasonable efforts to resolve the matter within thirty (30) Calendar Days after receipt \nof the Notice of Dispute. This informal process is not a condition to seeking \nemergency relief, filing a FERC complaint, or invoking any ADR processes. \n11.2. Alternative Dispute Resolution. If a dispute is not resolved informally, any Party \nmay request Alternative Dispute Resolution (“ADR”). The Parties shall use the ADR \nprocedures, neutral-selection process, confidentiality protections, and timing \nrequirements specified in the applicable FERC rules. ADR shall be conducted by \npersons knowledgeable in electric utility, transmission, and FERC matters and shall \nnot alter a jurisdictional rate, term, or condition unless accepted or approved by the \nFERC. \n11.3. FERC Complaints and Other Rights. Any Party may instead file a complaint, \npetition, or other pleading with the FERC under Section 206 or Section 306 of the \nFederal Power Act, or seek other relief available under the Federal Power Act or \nApplicable Laws and Regulations, and DesertLink may make any filing under Section"},{"page":132,"startToken":53707,"endToken":54199,"text":"40 \n \n205 of the Federal Power Act permitted by Section 12.12. No Party’s participation in \ninformal negotiations or ADR waives or limits its right to seek FERC action. A final \nADR determination affecting jurisdictional rates, terms, conditions, charges, or \nNetwork Upgrades shall be filed with the FERC if required. \n11.4. Costs and Interim Performance. Unless otherwise determined through ADR, the \nParties shall bear their own costs and share neutral costs as specified by the applicable \nADR procedure. During a dispute, each Party shall continue performing undisputed \npayment and operational obligations, and shall pay undisputed amounts when due.  \n11.5. Implementation of Dispute Determinations; TRBAA. Within thirty (30) Calendar \nDays after a dispute under this Article 11 is finally resolved, whether by written \nagreement of the Parties, a final ADR determination (subject to any required \nCommission filing or acceptance), or a final Commission order (each, a “Dispute \nDetermination”), DesertLink shall: (a) update the affected MTRC Calculation \nTemplate, Schedules, Cumulative Revenue Ledger, Reconciliation Statement, and \nRequired Operational Security, as applicable, and serve the updated documents on \nEligible Customer; and (b) invoice or refund, as applicable, any amount owed between \nthe Parties as a result of the Dispute Determination, without interest. To the extent a \nDispute Determination changes a TRBAA Credit or any other amount previously \ncredited to, or recovered from, transmission customers, including any change in \nSupplemental MTRC Receipts or Applied Security Proceeds for a prior Rate Year, \nDesertLink shall record the resulting difference in the TRBA under Section 6.8 and \nflow it through to transmission customers through the TRBAA, and any amount so \nreturned by DesertLink to transmission customers shall include interest as provided in \nSection 5.5 of the TO Tariff. If a final Commission order in a proceeding concerning \nDesertLink’s TRBAA requires a change to any TRBAA Credit attributable to this \nAgreement, DesertLink shall implement that order in the TRBA and shall make any \ncorresponding updates and adjustments between the Parties under this Section 11.5 as \nif the order were a Dispute Determination. Nothing in this Section reopens the Final \nAnnual MTRC or Total Required Revenue Commitment except as required to \nimplement a Dispute Determination or as permitted by Section 6.3.1. \n12. Miscellaneous. \n12.1. Amendment. Except for updates to the MTRC Calculation Template expressly \nauthorized by Section 6.3.1, updates implementing a Dispute Determination under \nSection 11.5, and administrative updates expressly permitted elsewhere in this \nAgreement, this Agreement may be amended only by a written instrument executed by \nthe Parties. An authorized template update shall not change the substantive \nmethodology or other terms of this Agreement. Any material deviation from the \nCommission-accepted pro forma and any unexecuted amendment shall be filed with \nFERC as required by the applicable tariffs and Commission rules.  \n12.2. Entire Agreement. This Agreement, its Schedules, the relevant Interconnection \nAgreement, and other agreements expressly incorporated herein state the Parties’ \ncomplete understanding concerning the wholesale cost recovery mechanism. Nothing"},{"page":133,"startToken":54199,"endToken":54632,"text":"41 \n \nin this Agreement establishes the retail rates, charges, or security arrangements \nbetween Eligible Customer and Large Load Customer. \n12.3. Governing Tariffs and Order of Precedence. This Agreement shall be interpreted \nand administered consistently with the Federal Power Act, applicable Commission \norders, the CAISO Tariff, and the TO Tariff. The CAISO Tariff, the TO Tariff, and \nany other tariff or agreement within the CAISO Requirements that is on file with or \naccepted by the Commission control over this Agreement and its Schedules to the \nextent of an irreconcilable conflict, with each controlling the matters within its \nrespective scope. Nothing in this Agreement shall require a Party or CAISO to take \naction inconsistent with an applicable Commission-accepted tariff, agreement, or \norder. \nSubject to the preceding paragraph: \n(a) the Formula Rate and Protocols shall control the calculation, information \nexchange, and true-up of DesertLink’s Net Revenue Requirement, including the \nrate base treatment of the Covered Upgrades; Section 5.5 of the TO Tariff shall \ncontrol the flow-through of TRBAA Credits to transmission customers through \nthe TRBAA; and any dispute concerning a TRBAA Credit, or any other matter \narising under this Agreement, shall be resolved under Article 11, and any \nresulting adjustment shall be implemented as provided in Section 11.5. The \nMTRC Calculation Template in Schedule 5, and not the Formula Rate or \nProtocols, shall control calculation of the Estimated Annual MTRC and Final \nAnnual MTRC; \n(b) this Agreement shall control the determination and administration of the \nSupplemental MTRC, Cumulative Revenue Responsibility, Operational Security, \nprospective reassignment, and the other wholesale revenue-support obligations \nestablished herein; \n(c) the applicable Interconnection Agreement shall control the physical \ninterconnection, design, engineering, procurement, construction, testing, \nenergization, and operating requirements, except to the extent this Agreement \nexpressly establishes or supplements construction-cost, pre-service termination-\ncost, revenue-support, or Security obligations; provided that the applicable \ninstruments shall be interpreted, to the extent reasonably possible, to give effect \nto both agreements and prevent duplicate recovery; \n(d) each applicable Affected System Arrangement shall control the design, \nconstruction, ownership, operation, cost responsibility, financial security or \ncredit support, and cost recovery applicable to the corresponding Affected \nSystem Upgrade as between the parties to that arrangement. Nothing in this \nAgreement modifies an Affected System Owner’s tariff, makes DesertLink \nresponsible for an obligation of an Affected System Owner, or makes an \nAffected System Owner a Party to this Agreement; \n(e) the body of this Agreement shall control over a Schedule in the event of a \nconflict, except where the Schedule identifies a project-specific election, value, \nmethodology, or term that this Agreement expressly authorizes the Parties to \nestablish in the Schedule; and"},{"page":134,"startToken":54632,"endToken":55096,"text":"42 \n \n(f) the Schedules shall control over other project-specific supporting documents or \nworkpapers that have not been filed with or accepted by the Commission. \nThe Parties shall attempt to interpret the applicable instruments so that each is given \neffect and no provision is rendered superfluous. If an irreconcilable conflict affects a \nCommission-jurisdictional rate, term, or condition, the Parties shall seek any required \nCommission clarification, acceptance, or authorization. Pending resolution, the Parties \nshall continue performing all undisputed obligations. \n12.4. Governing Law. This Agreement shall be interpreted, governed by, and construed \nunder the laws of the State of California, without regard to the principles of conflict of \nlaws thereof, or the laws of the United States, as applicable, as if executed and to be \nperformed wholly within the State of California. \n12.5. Severability. If any term, covenant, or condition of this Agreement or the application \nor effect of any such term, covenant, or condition is held invalid as to any person, \nentity, or circumstance, or is determined to be unjust, unreasonable, unlawful, \nimprudent, or otherwise not in the public interest, by any court or government agency \nof competent jurisdiction, then such term, covenant, or condition shall remain in force \nand effect to the maximum extent permitted by law, and all other terms, covenants, \nand conditions of this Agreement and their application shall not be affected thereby \nbut shall remain in force and effect. The Parties shall be relieved of their obligations \nonly to the extent necessary to eliminate such regulatory or other determination, unless \na court or governmental agency of competent jurisdiction holds that such provisions \nare not severable from all other provisions of this Agreement. \n12.6. No Third Party Beneficiaries. Except for the rights of Large Load Customer and any \nSuccessor Eligible Customer under Section 6.12, this Agreement is not intended to and \ndoes not create rights, remedies, or benefits of any character whatsoever in favor of \nany persons, corporations, associations, or entities other than the Parties, and the \nobligations herein assumed are solely for the use and benefit of the Parties, their \nsuccessors in interest and, where permitted, their assigns. \n12.7. Survival. Expiration or termination of this Agreement shall not affect any right, \nliability, or obligation that accrued before the effective date of expiration or \ntermination or that, by its express terms or nature, is intended to continue thereafter. \nWithout limiting the foregoing, the following shall survive expiration or termination \nfor the period necessary to give them effect: \n(a) all outstanding payment, refund, reimbursement, reconciliation, true-up, Security, \nand release obligations arising under Articles 3, 4, 6, and 7; \n(b) the determination and final satisfaction, transfer, or prospective reassignment of \nthe Cumulative Revenue Responsibility; \n(c) the calculation and implementation of TRBAA Credits and other adjustments \nnecessary to prevent duplicate recovery;"},{"page":135,"startToken":55096,"endToken":55541,"text":"43 \n \n(d) the confidentiality and information-protection obligations applicable under \nSection 6.12, Section 16.3 of the TO Tariff, the CAISO Tariff, and any \napplicable confidentiality agreement; \n(e) the Parties’ rights to obtain, inspect, retain, verify, and challenge books, records, \nmetering data, settlement data, calculations, and supporting workpapers relating \nto periods before expiration or termination; \n(f) the indemnification obligations in Article 9 with respect to acts, omissions, \ncircumstances, or claims arising before expiration or termination; \n(g) the dispute-resolution provisions in Article 11 with respect to any surviving right, \nliability, or obligation; and \n(h) any provision that expressly states that it survives or that must survive to prevent \nduplicate recovery or give effect to the Parties’ rights and obligations. \nSurvival of a provision shall not extend the underlying payment or Security obligation \nbeyond the point at which that obligation has been finally satisfied, transferred, \nreassigned, refunded, or released in accordance with this Agreement. \n12.8. No Waiver. A Party’s delay or failure to exercise any right or remedy under this \nAgreement shall not constitute a waiver of that or any other right or remedy. A waiver \nshall be effective only if stated in a written instrument executed by the Party granting \nthe waiver and shall apply only to the specific matter and circumstances stated therein. \nA waiver on one occasion shall not constitute a continuing waiver or a waiver on any \nother occasion. No course of performance or dealing shall amend this Agreement or \nwaive any Commission-jurisdictional rate, term, or condition. Nothing in this Section \nlimits a Party’s rights under the Federal Power Act or Applicable Laws and \nRegulations. \n12.9. Counterparts and Electronic Signatures. This Agreement, any amendment, and any \nassumption or acknowledgment executed pursuant to it may be executed in \ncounterparts, each of which shall be deemed an original and all of which together shall \nconstitute one instrument. Signatures transmitted electronically, including by portable \ndocument format or an electronic-signature platform, shall have the same force and \neffect as original signatures to the extent permitted by Applicable Laws and \nRegulations. Each Party agrees that it shall not contest the validity or enforceability of \nan instrument solely because it was executed or transmitted electronically. \n12.10. Authority. Each Party represents and warrants that: \n(a) it is duly organized, validly existing, and in good standing under the laws of its \njurisdiction of organization, to the extent such concepts apply; \n(b) it has the requisite power and authority to execute, deliver, and perform this \nAgreement; \n(c) the execution, delivery, and performance of this Agreement have been duly \nauthorized by all necessary organizational action; \n(d) the individual executing this Agreement on its behalf is authorized to do so; and"},{"page":136,"startToken":55541,"endToken":55825,"text":"44 \n \n(e) subject to any required Commission acceptance or other regulatory approval \nexpressly identified in this Agreement, this Agreement constitutes its valid and \nbinding obligation, enforceable in accordance with its terms. \nThe Large Load Customer represents only that the individual executing the Limited \nAcknowledgment is authorized to execute that acknowledgment on its behalf. \nExecution of the Limited Acknowledgment does not make the Large Load Customer a \nParty or expand its obligations beyond those expressly stated in the Limited \nAcknowledgment or in a separate undertaking executed by the Large Load Customer. \n12.11. Notices. All notices, requests, demands, and other communications hereunder (herein \ncollectively called “Notice”) shall be in writing and will be deemed to have been duly \ngiven when (a) personally delivered to the receiving Party’s physical address, (b) sent \nby overnight courier service to the receiving Party’s physical address, or (c) delivered \nvia electronic transmission with a courtesy copy sent by overnight courier service to \nthe receiving Party’s physical address, in each case to the appropriate addresses or \nemail addresses set forth below (or to such other addresses or email addresses as a \nParty may designate by Notice to the other Party); provided that any such deliveries \nreceived after normal business hours in the place of business of the receiving Party \nshall be deemed to be received on the next Business Day: \n \nIf to DesertLink: \n \nDesertLink, LLC \nAttn: Asset Manager \n16150 Main Circle Drive, Suite 310 \nChesterfield, Missouri 63017 \nEmail: rhohlt@lspower.com \n \nWith a copy to: \n \nDesertLink, LLC \nAttn: Legal Department \n16150 Main Circle Drive, Suite 310 \nChesterfield, Missouri 63017 \nEmail: legalnotices@lspower.com \n \nIf to Eligible Customer: \n \n[Company name] \n[Contact name] \n[Address] \nEmail: [Insert] \nIf to Large Load Customer: \n[Company name]"},{"page":137,"startToken":55825,"endToken":56021,"text":"45 \n \n[Contact name] \n[Address] \nEmail: [Insert] \n12.12. Reservation of Rights. DesertLink shall have the right to make a unilateral filing with \nthe Commission under Section 205 of the Federal Power Act to modify this \nAgreement or the pro forma form of this Agreement, and Eligible Customer shall have \nthe right to make a unilateral filing with the Commission under Section 206 of the \nFederal Power Act to modify this Agreement. Each Party shall have the right to protest \nany such filing and to participate fully in any proceeding before the Commission. The \nstandard of review for any proposed change to this Agreement, whether proposed by a \nParty, a non-party, or the Commission acting on its own motion, shall be the just and \nreasonable standard under Sections 205 and 206 of the Federal Power Act. \n \n13. Project-Specific Schedules \n13.1. Required Schedules. Each executed Agreement shall include the following completed \nschedules, which are incorporated into this Agreement. \nSchedule 1 — Project and Allocation Data; \nSchedule 2 — Qualifying Transmission Revenues Methodology; \nSchedule 3 — Credit and Security Standards; \nSchedule 4 — CAISO Regional Project Allocation and Responsibility; and \nSchedule 5 — MTRC Calculation Template and Cumulative Revenue Ledger \n[Signature page follows.]"},{"page":138,"startToken":56021,"endToken":56158,"text":"46 \n \nIN WITNESS WHEREOF, the Parties have caused this Agreement to be duly executed by their \nduly authorized officers as of the day and year first above written. \n \nDESERTLINK, LLC \nBy: __________________________ \nName: ________________________ \nTitle: _________________________ \nDate: _________________________ \n[ELIGIBLE CUSTOMER] \nBy: __________________________ \nName: ________________________ \nTitle: _________________________ \nDate: _________________________ \n \nLIMITED ACKNOWLEDGMENT OF LARGE LOAD CUSTOMER \nLarge Load Customer acknowledges the assignment of cost responsibility to its facility and \nagrees to provide information and notices, authorize release of metering and settlement data, and \ncooperate in a transition to a Successor Eligible Customer. This acknowledgment does not make \nLarge Load Customer the wholesale obligor, establish a FERC-jurisdictional retail rate, or \nconstitute a guarantee of Eligible Customer’s payment obligations. Any separate guarantee or \ncollateral undertaking by Large Load Customer shall be governed by its own terms and filed \nwith FERC if required. \n[LARGE LOAD CUSTOMER] \nBy: __________________________ \nName: ________________________ \nTitle: _________________________ \nDate: _________________________"},{"page":139,"startToken":56158,"endToken":56296,"text":"Schedule 1 - 1 \n \nSchedule 1 \nProject and Allocation Data \n1. Purpose \nThis Schedule identifies the Large Load Facility, the applicable service request, each Large \nLoad-Driven Upgrade covered by this Agreement, the initial allocation of each Large Load-\nDriven Upgrade, and the applicable construction and operational security information. This \nSchedule is incorporated into and made part of the Agreement. \n2. Large Load Facility and Service Information \nLarge Load Customer \n[●] \nEligible Customer \n[●] \nLarge Load Facility\n[Name and description]\nPhysical Location of Large \nLoad Facility\n[●] \nPoint of Interconnection \n[●] \nMetering Point or Settlement \nIdentifier\n[●] \nRequested Service Level \n[●] MW \nRequested Service Phases \n[Identify the MW and expected commencement date of \neach phase]\nExpected Large Load Service \nCommencement Date\n[●] \nOutside Date \n[●] \nApplicable Study or \nAuthorization\n[Study name, number, version, and date] \nApplicable Interconnection, \nTransmission Service, or Other \nAgreement\n[●] \nCAISO or Other Relevant \nProject Identifier\n[●]"},{"page":140,"startToken":56296,"endToken":56349,"text":"Schedule 1 - 2 \n \n3. Large Load-Driven Upgrade Information \nEach Large Load-Driven Upgrade shall be identified separately. \nUpgrade 1 \nUpgrade Description \n[●] \nApplicable Study or \nAuthorization\n[●] \nOwner and Construction \nResponsibility\n[●] \nInitial Estimated Capital Cost \n$[●] \nExpected Construction \nCommencement Date\n[●] \nExpected Upgrade In-Service \nDate\n[●] \nActual Upgrade In-Service Date [●] \nMTRC Term End Date \n[●] \nShared, Phased, or Dependent \nFacility\n[●]"},{"page":141,"startToken":56349,"endToken":56426,"text":"Schedule 1 - 3 \n \nUpgrade 2 \nUpgrade Description \n[●] \nApplicable Study or \nAuthorization\n[●] \nOwner and Construction \nResponsibility\n[●] \nInitial Estimated Capital Cost \n$[●] \nExpected Construction \nCommencement Date\n[●] \nExpected Upgrade In-Service \nDate\n[●] \nActual Upgrade In-Service Date [●] \nMTRC Term End Date \n[●] \nShared, Phased, or Dependent \nFacility\n[●] \n \nUpgrade 3 \nUpgrade Description \n[●] \nApplicable Study or \nAuthorization\n[●] \nOwner and Construction \nResponsibility\n[●] \nInitial Estimated Capital Cost \n$[●] \nExpected Construction \nCommencement Date\n[●] \nExpected Upgrade In-Service \nDate\n[●] \nActual Upgrade In-Service Date [●] \nMTRC Term End Date \n[●] \nShared, Phased, or Dependent \nFacility\n[●]"},{"page":142,"startToken":56426,"endToken":56528,"text":"Schedule 1 - 4 \n \n \n4. Initial Allocation and Annual MTRC Information \nFor each Large Load-Driven Upgrade, the Initial Allocation Percentage assigned to the Large \nLoad Customer under this Agreement shall be identified below. The sum of the percentages \nallocated to all Large Load Customers for a Large Load-Driven Upgrade shall not exceed one \nhundred percent (100%). \nUpgrade 1 \nInitial Estimated Annual \nMTRC Attributable to Covered \nUpgrade \n$[●] \nInitial Allocation Percentage \nAssigned to This Large Load \nCustomer\n[●]% \nInitial Estimated Annual \nMTRC Allocated to This Large \nLoad Customer \n$[●] \nAggregate Initial Allocation \nPercentage Assigned to All \nLarge Load Customers\n[●]% \nPercentage Allocated to Other \nSystem Needs or Customers\n[●]%"},{"page":143,"startToken":56528,"endToken":56665,"text":"Schedule 1 - 5 \n \nUpgrade 2 \nInitial Estimated Annual \nMTRC Attributable to Covered \nUpgrade \n$[●] \nInitial Allocation Percentage \nAssigned to This Large Load \nCustomer\n[●]% \nInitial Estimated Annual \nMTRC Allocated to This Large \nLoad Customer \n$[●] \nAggregate Initial Allocation \nPercentage Assigned to All \nLarge Load Customers\n[●]% \nPercentage Allocated to Other \nSystem Needs or Customers\n[●]% \n \nUpgrade 3 \nInitial Estimated Annual \nMTRC Attributable to Covered \nUpgrade \n$[●] \nInitial Allocation Percentage \nAssigned to This Large Load \nCustomer\n[●]% \nInitial Estimated Annual \nMTRC Allocated to This Large \nLoad Customer \n$[●] \nAggregate Initial Allocation \nPercentage Assigned to All \nLarge Load Customers\n[●]% \nPercentage Allocated to Other \nSystem Needs or Customers\n[●]% \n \nAny portion of a Large Load-Driven Upgrade not allocated to a Large Load Customer shall be \nexcluded from the Annual MTRC allocable to any Large Load Customer and shall remain \nsubject to otherwise-applicable CAISO cost allocation and rate recovery requirements."},{"page":144,"startToken":56665,"endToken":56789,"text":"Schedule 1 - 6 \n \n5. Allocation Methodology and Capability Basis \nThe Initial Allocation Percentage for each Large Load-Driven Upgrade is supported by the \nfollowing study findings and allocation methodology: \nUpgrade 1 \nCustomers or Projects Studied \nTogether\n[●] \nAllocation Methodology \n[●] \nRequested Service or Electrical \nImpact Used in Allocation\n[●] \nIncremental Capability Created \nby Upgrade, if Quantified\n[●] MW or other applicable measure \nCapability Initially Assigned to \nThis Large Load Customer\n[●] \nExplanation of Any Percentage \nAllocated to Other System \nNeeds or Customers\n[●] \nUpgrade 2 \nCustomers or Projects Studied \nTogether\n[●] \nAllocation Methodology \n[●] \nRequested Service or Electrical \nImpact Used in Allocation\n[●] \nIncremental Capability Created \nby Upgrade, if Quantified\n[●] MW or other applicable measure \nCapability Initially Assigned to \nThis Large Load Customer\n[●] \nExplanation of Any Percentage \nAllocated to Other System \nNeeds or Customers\n[●]"},{"page":145,"startToken":56789,"endToken":56956,"text":"Schedule 1 - 7 \n \nUpgrade 3 \nCustomers or Projects Studied \nTogether\n[●] \nAllocation Methodology \n[●] \nRequested Service or Electrical \nImpact Used in Allocation\n[●] \nIncremental Capability Created \nby Upgrade, if Quantified\n[●] MW or other applicable measure \nCapability Initially Assigned to \nThis Large Load Customer\n[●] \nExplanation of Any Percentage \nAllocated to Other System \nNeeds or Customers\n[●] \n \nThe allocation methodology shall account for, as applicable: \n(a) Large Load Customers studied individually, jointly, or in a cluster; \n(b) the extent to which two or more Large Load Customers caused the need for or share a \nLarge Load-Driven Upgrade; \n(c) differing requested service levels, electrical impacts, development phases, and facility \nconfigurations; \n(d) facilities constructed in phases or placed in service on different dates; and \n(e) any portion of a facility determined at the outset to serve other system needs or \ncustomers. \n6. Initial Cumulative Revenue Responsibility and Security Information \nUpgrade 1 \nInitial Projected Cumulative \nRevenue Responsibility\n$[●] \nConstruction Security \nAttributable to Upgrade\n$[●] \nDate Operational Security Must \nBecome Effective\n[●] \nInitial Projected Incremental \nOperational Security \nAttributable to Upgrade\n$[●]"},{"page":146,"startToken":56956,"endToken":57133,"text":"Schedule 1 - 8 \n \nUpgrade 2 \nInitial Projected Cumulative \nRevenue Responsibility\n$[●] \nConstruction Security \nAttributable to Upgrade\n$[●] \nDate Operational Security Must \nBecome Effective\n[●] \nInitial Projected Incremental \nOperational Security \nAttributable to Upgrade\n$[●] \nUpgrade 3 \nInitial Projected Cumulative \nRevenue Responsibility\n$[●] \nConstruction Security \nAttributable to Upgrade\n$[●] \nDate Operational Security Must \nBecome Effective\n[●] \nInitial Projected Incremental \nOperational Security \nAttributable to Upgrade\n$[●] \n \nThe Initial Projected Cumulative Revenue Responsibility stated above represents the initial \nprojection of the Total Required Revenue Commitment for the applicable Large Load-Driven \nUpgrade, calculated as the Estimated Annual MTRC multiplied by twenty (20) using the MTRC \nCalculation Template in Schedule 5. \nConstruction Security shall remain applicable separately to each Large Load-Driven Upgrade \nuntil that upgrade reaches its Upgrade In-Service Date and the applicable conditions for release \nor conversion under Section 7.2 have been satisfied. \nOperational Security must be fully effective before the applicable Upgrade In-Service Date. If \ndifferent Large Load-Driven Upgrades are expected to reach their Upgrade In-Service Dates on \ndifferent dates, DesertLink shall recalculate the required Operational Security before each \nsubsequent Upgrade In-Service Date in accordance with Article 7."},{"page":147,"startToken":57133,"endToken":57613,"text":"Schedule 1 - 9 \n \n7. Schedule Qualifications \n7.1 Projected Amounts. The capital costs, Estimated Annual MTRC, projected Total \nRequired Revenue Commitment, Cumulative Revenue Responsibility, and Operational Security \namounts stated in this Schedule are initial projections provided for planning and administration \npurposes. They do not constitute fixed amounts, caps, or guarantees.  \n7.2 Initial and Applicable Allocation Percentages. The Initial Allocation Percentage \nidentified for each Large Load-Driven Upgrade shall remain the initial allocation of that upgrade \nto the Large Load Customer. The Applicable Allocation Percentage shall equal the Initial \nAllocation Percentage, as adjusted prospectively by any reassignment effective under Section 6.9 \nor as otherwise required by a final Commission order or applicable tariff provision. \nA change in capital costs, the Upgrade In-Service Date, Formula Rate inputs, or the annual \nrevenue requirement shall not, by itself, change the Initial Allocation Percentage or Applicable \nAllocation Percentage. Cancellation, abandonment, downsizing, curtailment, permanent \ncessation, or material reduction of service by the Large Load Customer also shall not, by itself, \nreduce either percentage. \n7.3 Allocation Limitation. The aggregate Annual MTRC assigned to all Large Load \nCustomers for a Covered Upgrade shall not exceed one hundred percent (100%) of the Annual \nMTRC for that Covered Upgrade. DesertLink shall not allocate the same upgrade cost, \ntransmission capability, or annual revenue requirement to more than one Large Load Customer. \n7.4 Upgrade In-Service Dates and MTRC Term End Dates. Each Expected Upgrade In-\nService Date stated in this Schedule is a planning estimate. DesertLink shall provide written \nnotice to Eligible Customer of a material change to an Expected Upgrade In-Service Date. \nWithin five (5) Business Days after a Covered Upgrade achieves its Upgrade In-Service Date, \nDesertLink shall provide written notice to Eligible Customer stating the actual Upgrade In-\nService Date and the corresponding MTRC Term End Date. DesertLink shall update this \nSchedule and the applicable Cumulative Revenue Ledger to reflect those dates. The actual \nUpgrade In-Service Date shall be determined in accordance with the definition of that term in the \nAgreement. Inclusion of pre-service Construction Work in Progress in rate base does not \nconstitute an Upgrade In-Service Date. \n7.5 Annual Updates. Changes in the Estimated Annual MTRC, Final Annual MTRC, Total \nRequired Revenue Commitment, Cumulative Revenue Responsibility, Supplemental MTRC, \nQualifying Transmission Revenues, or Operational Security resulting from the MTRC \nCalculation Template in Schedule 5, the Annual Projection, the Annual Update and \nReconciliation Statement, or an effective prospective reassignment under Section 6.9 do not \nrequire an amendment to this Schedule. \n7.6 Prospective Reassignment. DesertLink shall maintain the customer-, project-, and \nupgrade-specific ledger required by Sections 6.7 and 6.9. Any prospective reassignment shall be \nreflected in that ledger and in the applicable Annual Projection and Reconciliation Statement. A \nprospective reassignment shall adjust the Applicable Allocation Percentage but shall not revise \nthe Initial Allocation Percentage, produce a historical refund, or reopen a prior Rate Year."},{"page":148,"startToken":57613,"endToken":57928,"text":"Schedule 1 - 10 \n \n7.7 Updated Expected Dates. An update to an expected construction commencement date, \nExpected Upgrade In-Service Date, or expected Large Load Service Commencement Date may \nbe made by written notice and does not require an amendment to this Schedule unless the update \nalso changes a material rate, term, condition, facility scope, or allocation established by this \nAgreement. \n8. Supporting Materials \nThe following supporting materials are attached to or incorporated by reference into this \nSchedule: \n1. the applicable final transmission study or studies; \n2. the facilities list and cost estimate supporting each Large Load-Driven Upgrade; \n3. the study-based allocation methodology and calculations; \n4. the initial Annual MTRC and Total Required Revenue Commitment workpapers (per \nSchedule 5); \n5. the initial Cumulative Revenue Responsibility calculation; \n6. the Construction Security calculation; \n7. the initial projected Operational Security calculation; \n8. any applicable project diagrams, metering diagrams, or service-phase schedules; and \n9. each applicable Affected System study, Affected System Arrangement, and evidence of \nrequired financial security or credit support. \n9. Affected System Information \nThe following information shall be completed for each potential or confirmed Affected System. \nEligible Customer shall update the information and provide the documentation required by \nSection 4.2 if an Affected System or Affected System Upgrade is identified or the status of an \nAffected System Arrangement changes. \n1. Affected System Owner: [●] \n2. CAISO Participating TO or External Affected System: [●] \n3. Applicable Study and Project Identifier: [●] \n4. Identified System Impact: [●] \n5. Affected System Upgrade: [●] \n6. Estimated Cost: $[●] \n7. Affected System Arrangement: [Agreement name, parties, and date] \n8. Required Construction Financial Security or Credit Support: $[●] \n9. Required Post-In-Service Financial Security or Credit Support: $[●] \n10. Commission Filing or Acceptance Required: [Yes/No; docket and status] \n11. Deadline for Delivery to DesertLink: [●] \n12. Current Status: [Pending/Executed/Effective] \n13. If no Affected System or Affected System Upgrade has been identified when this \nSchedule is executed, insert the following certification:"},{"page":149,"startToken":57928,"endToken":57968,"text":"Schedule 1 - 11 \n \nNo Affected System or Affected System Upgrade has been identified as of [date]. This \nstatement does not limit Eligible Customer’s continuing obligations under Section 4.2 if \nan Affected System or Affected System Upgrade is subsequently identified."},{"page":150,"startToken":57968,"endToken":58261,"text":"Schedule 2 - 1 \n \nSchedule 2 \nQualifying Transmission Revenues Methodology \n1. Purpose and Controlling Principles \nThis Schedule establishes the reproducible methodology for calculating projected and actual \nQualifying Transmission Revenues attributable to the Large Load Facility. It is intended to \nidentify wholesale transmission revenues paid by or on behalf of Eligible Customer that are \nattributable to the Large Load Facility and reduce transmission revenues otherwise collected \nfrom CAISO customers or directly credit DesertLink’s Net Revenue Requirement. Such \nrevenues may include applicable TAC revenues and qualifying Wheeling Access Charges or \nother wholesale transmission-access, wheeling, or transmission-service charges under the \nCAISO Tariff or another Commission-accepted arrangement, including charges paid through a \nnon-PTO serving entity. The Supplemental MTRC therefore measures only the remaining \nshortfall below the applicable Annual MTRC. \nQualifying Transmission Revenues shall be counted once in calculating the Supplemental MTRC \nand the Cumulative Revenue Responsibility against the combined Annual MTRC for all Covered \nUpgrades. They shall not also be treated as a TRBAA Credit under Section 6.8 because they \nreduce transmission revenues otherwise collected from CAISO customers. This Schedule does \nnot modify CAISO settlement rules, establish a retail rate, impose any obligation on CAISO, or \nalter any cost allocation established under the CAISO Requirements. \n2. Project and Settlement Identifiers \nThe following information shall be completed for each Large Load Facility and updated \nadministratively when a meter, settlement identifier, Eligible Customer, or other listed item \nchanges. An administrative update that does not alter the Commission-accepted methodology \ndoes not require an amendment to the Agreement unless a filing is otherwise required by \nApplicable Laws and Regulations. \nLarge Load Customer \n[●] \nLarge Load Facility \n[●] \nPhysical location and applicable \nCAISO or out-of-state service \narea\n[●] \nEligible Customer at service \ncommencement\n[●] \nScheduling Coordinator \n[●] \nUtility Distribution Company, \nMetered Subsystem, or non-\nPTO serving entity\n[●]"},{"page":151,"startToken":58261,"endToken":58556,"text":"Schedule 2 - 2 \n \nCAISO resource, settlement, or \nload identifier(s)\n[●] \nRevenue-quality meter \nidentifier(s) and location(s)\n[●] \nMetering point used for this \ncalculation\n[●] \nLarge Load Service \nCommencement Date\n[●] \nApplicable TAC, Wheeling \nAccess Charge, or other CAISO \nTariff charge(s)\n[●] \nPrimary source of settlement \nand metering data\n[●] \n \n3. Data Sources and Responsibilities \n(a) DesertLink shall calculate projected and actual Qualifying Transmission Revenues using \nthe best available data from CAISO settlement statements, wheeling, transmission-access, \nand transmission service invoices, revenue-quality meter data, Eligible Customer and \nnon-PTO serving entity billing records, Scheduling Coordinator records, and other data \nmade available under the CAISO Tariff, another Commission-accepted arrangement, or \nauthorized by Eligible Customer and Large Load Customer. \n(b) Eligible Customer shall provide, or cause its Scheduling Coordinator, Utility Distribution \nCompany, Metering Coordinator, or other authorized agent to provide, all information \nreasonably necessary to identify and verify withdrawals attributable to the Large Load \nFacility. Eligible Customer shall maintain all authorizations reasonably necessary for \nrelease of that information. \n(c) The Large Load Customer shall provide the information and authorizations required by \nits Limited Acknowledgment, including information needed to distinguish the Large \nLoad Facility from other load behind a common meter or within a common settlement \nidentifier. \n(d) DesertLink may use CAISO data made available under the CAISO Requirements or \nthrough the authorizations provided under this Agreement. Nothing in this Schedule \nmakes CAISO a party to the Agreement or independently requires CAISO to calculate, \ninvoice, collect, or administer the Supplemental MTRC. \n(e) If final data are unavailable when a projection, invoice, Annual Update, or Reconciliation \nStatement is due, DesertLink may use a reasonable estimate based on the most recent \navailable data, the service forecast, applicable TAC rates, and known settlement \nadjustments. Estimated amounts shall be replaced with actual data in the next practicable \nreconciliation."},{"page":152,"startToken":58556,"endToken":58987,"text":"Schedule 2 - 3 \n \n4. Applicable Withdrawals \nFor each CAISO settlement interval or other reproducible billing interval, Applicable \nWithdrawals shall equal the metered energy withdrawals attributable to the Large Load Facility \nat the metering point identified in Section 2 of this Schedule, expressed in MWh and adjusted as \nfollows: \n(a) Imports, exports, station service, auxiliary load, behind-the-meter generation, storage \ncharging and discharging, and other injections or withdrawals shall be treated \nconsistently with the manner in which they are recognized for the applicable TAC charge \nunder the CAISO Tariff. \n(b) Distribution losses and transmission losses shall be included only to the extent they are \nincluded in the billing determinant for the applicable TAC component. The loss factor or \nmethod shall be identified in the project-specific table in Section 10 of this Schedule. \n(c) If the Large Load Facility shares a meter or settlement identifier with other load, the \nwithdrawals attributable to the Large Load Facility shall be determined from revenue-\nquality submeters or another objective allocation method identified in Section 10 of this \nSchedule. An allocation based solely on estimates may be used temporarily but shall be \nreconciled when reliable data become available. \n(d) Withdrawals shall not be counted for a period before the corresponding Annual MTRC is \nincluded in the Supplemental MTRC calculation under Section 6.4 of the Agreement, \nexcept where necessary to correct a prior-period error or resettlement. \n5. Applicable TAC Revenue \nApplicable TAC Revenue for an interval shall equal Applicable Withdrawals multiplied by the \nCAISO transmission rate or rates actually applicable to those withdrawals for that interval. The \ncalculation shall include only transmission charge components that contribute to recovery of the \nrevenue requirement in which DesertLink’s costs are included. It shall exclude retail distribution \ncharges, generation charges, non-transmission surcharges, taxes collected for another \ngovernmental entity, and any other charge that does not contribute to recovery of DesertLink’s \ntransmission revenue requirement. \nIf CAISO uses a monthly, annual, or other non-interval billing determinant, DesertLink shall \nperform the calculation using that same billing period and determinant. If more than one TAC \nrate or component applies, each component shall be calculated separately before applying the \nDesertLink Allocation Factor. \n6. DesertLink Allocation Factor \nThe DesertLink Allocation Factor shall identify the portion of Applicable TAC Revenue \nallocable to DesertLink for the relevant period. Unless a different Commission-accepted method \nis stated in Section 10 of this Schedule, the factor shall be calculated from the same revenue \nrequirement, billing determinant, allocation percentage, and other inputs used by CAISO to \ninclude DesertLink’s net transmission revenue requirement in the applicable TAC rate. \nFor each applicable rate component and period:"},{"page":153,"startToken":58987,"endToken":59412,"text":"Schedule 2 - 4 \n \nDesertLink Allocation Factor = DesertLink Net Revenue Requirement included in the \napplicable TAC component ÷ Total Net Revenue Requirement recovered through that TAC \ncomponent. \nIf DesertLink’s revenue requirement is recovered through a project-specific, zonal, or other \ndirect allocation rather than a systemwide factor, the corresponding Commission-accepted \nallocation percentage or rate component shall be used. The supporting workpapers shall identify \nthe source and calculation of each factor. \n7. Calculation of Qualifying Transmission Revenues \nProjected and actual Qualifying Transmission Revenues shall be calculated as follows for each \napplicable interval, month, or billing period and then aggregated for the Rate Year or partial Rate \nYear: \nQualifying Transmission Revenues =  Qualifying TAC Revenue + Qualifying Wheeling and \nOther Wholesale Transmission Revenues ± Applicable Adjustments. \nQualifying TAC Revenue = Σ [(Applicable Withdrawals × Applicable TAC Rate) × DesertLink \nAllocation Factor]. Qualifying Wheeling and Other Wholesale Transmission Revenues equal \nWheeling Access Charges and other wholesale transmission-access, wheeling, or transmission-\nservice charges actually paid by or on behalf of Eligible Customer to CAISO, a Participating TO, \nor a non-PTO transmission or load-serving entity for deliveries serving the Large Load Facility, \nbut only to the extent those revenues reduce transmission revenues otherwise collected through \nTAC or directly credit DesertLink’s Net Revenue Requirement. Applicable Adjustments shall \ninclude only amounts attributable to the Large Load Facility, including CAISO resettlements, \nbilling corrections, refunds, charge reversals, balancing-account adjustments, and other \nadjustments that change the qualifying transmission revenue. Bad debt or uncollectible amounts \nshall reduce Qualifying Transmission Revenues only to the extent the corresponding revenue is \nnot recovered from another source and is not otherwise included in DesertLink’s Formula Rate \nrecovery. \n8. Projections, Actuals, Resettlements, and Customer Changes \n(a) The Annual Projection shall use forecast withdrawals, then-effective or forecast TAC \nrates, the most recent DesertLink Allocation Factor, and known adjustments. The \nworkpapers shall separately identify each material assumption. \n(b) The Reconciliation Statement shall replace projected values with actual withdrawals, \nrates, factors, and adjustments for the applicable period. CAISO resettlements or other \ncorrections received after a Reconciliation Statement becomes final shall be reflected in \nthe next practicable Reconciliation Statement and Annual Update, subject to Section 6.6 \nof the Agreement, and any dispute concerning them shall be resolved under Article 11 of \nthe Agreement. \n(c) A change in Eligible Customer, Scheduling Coordinator, or retail service provider shall \nnot interrupt the calculation or cause the same withdrawals or revenues to be omitted or \ncounted more than once. Qualifying Transmission Revenues shall remain associated with \nthe Large Load Customer and Large Load Facility, regardless of which Eligible \nCustomer is responsible for payment during the applicable period."},{"page":154,"startToken":59412,"endToken":59656,"text":"Schedule 2 - 5 \n \n(d) If two or more Eligible Customers serve the Large Load Facility during a Rate Year, the \nQualifying Transmission Revenues and corresponding Supplemental MTRC shall be \nassigned between them based on the periods during which each provided service, unless \nthe applicable transition agreement provides another Commission-accepted allocation. \n9. Workpapers, Verification, and Records \nWith each Annual Projection and Reconciliation Statement, DesertLink shall provide \nworkpapers sufficient for Eligible Customer to reproduce the calculation, including applicable \nmeter quantities, TAC rates, DesertLink Allocation Factors, adjustments, source references, and \na reconciliation to the corresponding Supplemental MTRC and Cumulative Revenue Ledger. \nCustomer-specific or commercially sensitive information may be provided subject to the \nconfidentiality provisions of Section 16.3 of the TO Tariff, the CAISO Tariff, and any applicable \nconfidentiality agreement. \nDesertLink, Eligible Customer, and Large Load Customer shall retain supporting records for the \nperiod required by the CAISO Tariff, Commission regulations, and Applicable Laws and \nRegulations, and in all events until completion of any timely initiated review, audit, or dispute \nconcerning the applicable Rate Year. Any dispute concerning the calculation shall be resolved \nunder Article 11 of the Agreement. \n10. Project-Specific Methodology Elections \nApplicable Withdrawals \nmethodology\n[●] \nTreatment of shared meters or \nidentifiers\n[●] \nTreatment of behind-the-meter \ngeneration and storage\n[●] \nApplicable TAC, Wheeling \nAccess Charge, or other CAISO \nTariff rate component(s)\n[●] \nDesertLink Allocation Factor \nmethodology\n[●] \nLoss factor or loss methodology \n[●] \nTreatment of exports and \nstation service\n[●] \nTreatment of refunds and \nresettlements\n[●] \nTreatment of bad debt or \nuncollectible amounts\n[●]"},{"page":155,"startToken":59656,"endToken":59814,"text":"Schedule 2 - 6 \n \nProjection methodology \n[●] \nData-delivery process and \ntiming\n[●] \nOther Commission-accepted \nproject-specific provision\n[●] \n \nThe methodology shall specify the metering point, applicable local and regional TAC \ncomponents, DesertLink allocation factor, applicable Wheeling Access Charges or other \nwholesale transmission access, wheeling, or transmission charges, the identity of any non-PTO \nserving entity collecting the charge, the basis for attributing each charge to the Large Load \nFacility, and evidence that the charge reduces transmission revenues otherwise collected through \nTAC or directly credits DesertLink’s Net Revenue Requirement. It also shall specify treatment of \nlosses, refunds, resettlements, bad debt and balancing-account adjustments, treatment of a \nchange in Eligible Customer, the source of billing and meter data, and the calculation and \nverification of projected and actual revenue. Qualifying Transmission Revenues count toward the \nannual and cumulative responsibility but are not separately credited against DesertLink’s \ntransmission revenue requirement because they already reduce transmission revenues otherwise \ncollected from CAISO customers or directly credit DesertLink’s Net Revenue Requirement."},{"page":156,"startToken":59814,"endToken":60129,"text":"Schedule 3 - 1 \n \n \nSchedule 3 \nCredit and Security Standards \n1. Purpose and Application \nThis Schedule establishes the forms, delivery, maintenance, replacement, draw, application, and \nrelease requirements for all Construction Security and Operational Security required under \nArticle 7. Except for the limited reduction of direct Operational Security provided in Section 3, \nall Security shall be provided directly by Eligible Customer. \n2. Permitted Forms of Security \nEligible Customer may provide Security in the form of cash, a Letter of Credit, or any \ncombination thereof. DesertLink may accept another form of Security if it determines, in its sole \ndiscretion, that the form is acceptable. \nCash collateral shall be delivered in immediately available funds to an account designated by \nDesertLink and shall count dollar-for-dollar toward the applicable Required Security Amount \nwhile held by DesertLink. \n(a) Construction Security \nEligible Customer shall provide and maintain all Construction Security directly in one or more \nforms permitted under this Section 2. A Retail Security Certification and Qualifying Retail \nSecurity Support shall not constitute, reduce, replace, or satisfy Construction Security or any Pre-\nIn-Service Termination Costs. \n(b) Operational Security \nExcept to the extent reduced under Section 3, Eligible Customer shall provide and maintain \ndirect Operational Security in one or more forms permitted under this Section 2 in an amount \nequal to one hundred percent (100%) of the nominal Remaining Cumulative Revenue \nResponsibility. \n3. Retail Security Certification \nA current Retail Security Certification reduces the direct Operational Security requirement \ndollar-for-dollar by the amount of Qualifying Retail Security Support identified in that \ncertification. It does not reduce Eligible Customer’s underlying obligations, constitute Security \nposted directly with DesertLink, or apply to Construction Security or Pre-In-Service Termination \nCosts. \nEach Retail Security Certification must be substantially in the form of Exhibit A contained in \nSchedule 3 of this Agreement. Eligible Customer shall deliver a Retail Security Certification \nbefore first relying on Qualifying Retail Security Support to reduce the direct Operational"},{"page":157,"startToken":60129,"endToken":60571,"text":"Schedule 3 - 2 \n \nSecurity requirement. The Retail Security Certification shall remain effective unless and until \nsuperseded, withdrawn, or deemed ineffective under this Agreement. Eligible Customer shall \ndeliver an updated Retail Security Certification within three (3) Business Days after any \nreduction, draw, expiration, nonrenewal, termination, amendment, loss of enforceable draw or \napplication rights, or other event that could impair the certified support. \nWith each Reconciliation Statement, DesertLink may identify the amount of Qualifying Retail \nSecurity Support then reflected in calculating Required Operational Security. That identification \ndoes not require Eligible Customer to deliver a new Retail Security Certification unless an event \nrequiring an update has occurred. \nDesertLink may rely on the certification without reviewing the underlying retail security \ndocuments in the ordinary course, but may request supporting information after a payment \ndefault, Credit Review Event, Material Adverse Credit Event, or reasonable basis to question the \ncertification. \n4. Letter of Credit Requirements \nIf Eligible Customer provides a Letter of Credit as Security, the Letter of Credit must be \nirrevocable, unconditional, transferable, payable at sight, and permit partial and multiple draws. \nIt must be issued by a major United States commercial bank or United States branch of a major \nforeign commercial bank rated at least A- by S&P, A3 by Moody’s, or A- by Fitch, in each case \nby at least two of those three agencies, and otherwise be in form and substance reasonably \nacceptable to DesertLink. \nEach Letter of Credit must have an initial stated term of at least twelve (12) months and provide \nDesertLink at least ninety (90) Calendar Days’ prior written notice of nonrenewal. Eligible \nCustomer shall provide a conforming extension, replacement Letter of Credit, cash collateral, or \nother Security accepted by DesertLink no later than sixty (60) Calendar Days before the \napplicable expiration date following a notice of nonrenewal, and within fifteen (15) Business \nDays after an issuer rating reduction. \nIf Eligible Customer fails to timely provide the required replacement or substitute Security, \nDesertLink may, before the applicable Letter of Credit expires, draw all or any portion of the \nthen-available amount and retain the proceeds as cash collateral, apply the proceeds to secured \nobligations, or both. \n5. Security Notices; Maintenance; and Replenishment \nDesertLink may issue a Security Notice whenever it reasonably determines that the Required \nSecurity Amount exceeds available Security, including as a result of a draw, application of cash \ncollateral, change in the Required Security Amount, loss of Qualifying Retail Security Support, \nor other event affecting Security availability. \nEligible Customer shall provide any required increase, restoration, replacement, or other cure \nwithin fifteen (15) Business Days after receipt of the Security Notice, or by the applicable in-\nservice date if earlier."},{"page":158,"startToken":60571,"endToken":60735,"text":"Schedule 3 - 3 \n \n6. Draws; Application; and Release \nDesertLink may draw against a Letter of Credit, apply cash collateral, or apply another accepted \nform of Security as permitted under Article 7. A draw, the holding of proceeds or cash collateral, \nor replenishment does not by itself satisfy an obligation or reduce Cumulative Revenue \nResponsibility. Proceeds of Operational Security become Applied Security Proceeds only when \napplied to an identified secured obligation as provided in Section 7.6; proceeds of Construction \nSecurity are treated as provided in Sections 3.3.2 and 3.3.3. \nDesertLink shall release excess Security after the applicable Reconciliation Statement becomes \nfinal. DesertLink shall release all remaining Security within thirty (30) Calendar Days after final \nsatisfaction of all secured obligations, subject to any specifically identified unresolved dispute. \n7. Required Security Amount Not a Limitation \nThe Required Security Amount is based on then-current estimates and calculations and does not \nlimit Eligible Customer’s total liability or responsibility for its obligations under this Agreement."},{"page":159,"startToken":60735,"endToken":61059,"text":"Schedule 3, Exhibit A \nForm of Retail Security Certification \nRetail Security Certification \nTo: DesertLink, LLC \nRe: Large Load Cost Recovery Agreement dated [●] between DesertLink, LLC and [Eligible \nCustomer] (the “Agreement”) \nThe undersigned, an authorized officer of [Eligible Customer], certifies on behalf of Eligible \nCustomer, as of the date of this certification, as follows: \n1. The retail Large Load Customer is [name], and the Large Load Facility is [identify facility]. \n2. The retail security arrangement is [identify agreement, security type, provider or issuer, \ninstrument number if applicable, and effective and expiration dates]. \n3. The amount of retail security currently available to Eligible Customer and available for the \nwholesale obligations under the Agreement is $[●]. \n4. Eligible Customer has enforceable draw or application rights, or the benefit of a binding \nundertaking, that permit it to use the retail-security proceeds to satisfy the corresponding \nwholesale obligations under the Agreement. \n5. The certified amount has not been counted for another inconsistent obligation and has not \nbeen reduced, drawn, expired, cancelled, or otherwise impaired except as disclosed here: [●]. \n6. The retail security arrangement has the following renewal, expiration, and notice terms: [●]. \nEligible Customer will deliver an updated Retail Security Certification to DesertLink within \nthree (3) Business Days after any reduction, draw, expiration, nonrenewal, termination, \namendment, loss of enforceable draw or application rights, or other event that could impair \nthe certified support. \n7. The statements in this certification are true and complete in all material respects as of the \ndate of this certification. Eligible Customer understands that DesertLink is entitled to rely on \nthis continuing certification without reviewing the underlying retail-security documents in \nthe ordinary course, subject to DesertLink’s rights under Article 7 and Schedule 3. No annual \nrenewal or recertification is required unless an updated Retail Security Certification is \nrequired under Item 6. \nThis Retail Security Certification is continuing and shall remain effective unless and until \nsuperseded, withdrawn, or deemed ineffective under the Agreement. \nELIGIBLE CUSTOMER \nBy: ________________________________ \nName: ______________________________ \nTitle: _______________________________ \nDate: _______________________________"},{"page":160,"startToken":61059,"endToken":61343,"text":"Schedule 4 - 1 \n \nSchedule 4 \nCAISO Regional Project Allocation and Responsibility \nThis Schedule shall identify each CAISO-Assigned Regional Project associated with the Large \nLoad Facility. If no CAISO-Assigned Regional Project has been identified as of the Effective \nDate, this Schedule shall state “None identified as of [date]” and shall be updated promptly after \nCAISO formally assigns a specific project share to the Large Load Facility. The assigned share, \nownership, expected and actual Regional Project In-Service Date, any Commission-authorized \nabandoned-plant incentive and its applicable order, any pre-service payment or security required \nby the CAISO Tariff or another Commission-accepted arrangement, billing path, applicable \noperational security, and credits or true-ups shall be documented below. The Schedule shall not \nbe read to impose pre-service Construction Security under this Agreement unless separately \nrequired by the applicable tariff or Commission-accepted arrangement. \nRequired project information \nProject-specific entry \nCAISO project name and identification number \n[to be completed] \nProject owner and other responsible entities \n[to be completed] \nCAISO Tariff provision, order, study, or formal \ndetermination establishing the specific assignment \n[to be completed] \nDate the assignment is made and its effective date \n[to be completed] \nLarge Load Facility to which the specific share is \nassigned \n[to be completed] \nAssigned share: percentage, dollar amount, or other \nCAISO-approved measure \n[to be completed] \nAllocation basis and calculation, including any share \nassigned to other beneficiaries \n[to be completed] \nProject ownership and whether costs are included in \nDesertLink’s Formula Rate \n[to be completed] \nExpected and actual project in-service date \n[to be completed] \nEstimated Annual MTRC and, once established, \nFinal Annual MTRC for the project share (the \nRegional Project Allocated ARR), together with the \nprojected Total Required Revenue Commitment, if \nDesertLink-owned and included in its Formula Rate \n[to be completed]"},{"page":161,"startToken":61343,"endToken":61568,"text":"Schedule 4 - 2 \n \nRequired project information \nProject-specific entry \nBilling entity, payment method, applicable tariff or \nproject-owner arrangement, and invoicing schedule \n[to be completed] \nConstruction and operational security required, \nsecurity provider, amount, effective date, and \ndeadline \n[to be completed] \nTreatment of TAC revenues, direct payments, credits, \nrefunds, and true-ups to prevent duplicate recovery \n[to be completed] \nDeadline for Eligible Customer to provide executed \narrangement or compliance evidence \n[to be completed] \nMethod and timing for any prospective assignment \nchange authorized by the CAISO Tariff or \nCommission-accepted methodology \n[to be completed] \nCommission order and status authorizing abandoned-\nplant incentive for the project, including applicable \nproject scope and recovery terms\n[to be completed] \nPre-service cancellation or abandonment cost \ntreatment under the CAISO Tariff, Commission \norder, or approved project arrangement; any \ncustomer contribution or security required and \napplicable credits\n[to be completed] \nFor a CAISO-Assigned Regional Project owned by another entity, this Schedule records the \nEligible Customer’s separate obligation under the CAISO Tariff or project-owner arrangement. \nThat obligation is not included in any Annual MTRC, Regional Project Allocated ARR, Total \nRequired Revenue Commitment, Cumulative Revenue Responsibility, or TRBAA Credit unless \nthe costs are included in DesertLink’s Formula Rate and the specific share is expressly identified \nas DesertLink’s responsibility. Any applicable CAISO Tariff credit or project-owner credit shall \nbe applied to prevent recovery of the same assigned share more than once."},{"page":162,"startToken":61568,"endToken":61940,"text":"Schedule 5 - 1 \n \nSchedule 5 \nMTRC Calculation Template and Cumulative Revenue Ledger \nThis Schedule contains the project-specific calculation of each Estimated Annual MTRC and \nFinal Annual MTRC and the Cumulative Revenue Ledger. DesertLink shall calculate each \nAnnual MTRC solely under this Schedule. The Final Annual MTRC shall equal the applicable \nfinal incurred capital cost multiplied by the Project-Specific Levelized Fixed Charge Rate \ncalculated in this Schedule. The calculation shall identify the applicable capital-cost input, \npresent-worth tax-depreciation benefits, Formula Rate inputs, fixed expense allocator, applicable \nallocation percentage, Annual MTRC, Total Required Revenue Commitment, Remaining \nCumulative Revenue Responsibility, and supporting inputs.  \nFor purposes of calculating present-worth federal and state income-tax depreciation benefits, the \nSchedule applies a levelized-depreciation rate of five percent (5%) of the applicable capital cost \ninput in each year of the twenty (20)-year MTRC Term. This levelized-depreciation schedule is \nnot a separate annual charge. The Schedule is fixed on the Final MTRC Determination Date \nexcept to correct an error or fraud, to implement an effective prospective reassignment, to \nimplement a final FERC order applicable to the calculation, to implement a Dispute \nDetermination under Section 11.5, or to reflect, prospectively, a change in (i) DesertLink’s return \non equity component of its Formula Rate, resulting from a final FERC order accepting or \napproving such change, or (ii) applicable federal or state tax rates or tax law enacted after the \nFinal MTRC Determination Date; provided that, the five percent (5%) annual levelized-\ndepreciation schedule shall remain fixed for the MTRC Term unless a final FERC order requires \notherwise. \nThe following project-specific calculation and ledger shall be completed for each Covered \nUpgrade. DesertLink shall include an updated ledger statement in each Reconciliation Statement \nserved on Eligible Customer under Sections 6.6 and 6.7; this Schedule does not impose a \nseparate FERC filing requirement. \nAnnual Ledger Service. DesertLink shall update the Cumulative Revenue Ledger at least \nannually in connection with its Annual Update and shall include the resulting statement and the \nsupporting workpapers in each Reconciliation Statement served on Eligible Customer. The \nstatement is an agreement-administration record and is not required to be filed with FERC unless \nFERC otherwise requires. Any dispute concerning the statement shall be resolved under Article \n11 of the Agreement."},{"page":163,"startToken":61940,"endToken":61946,"text":"Schedule 5 - 2 \n \nInputs and Security"},{"page":164,"startToken":61946,"endToken":61955,"text":"Schedule 5 - 3 \n \nQualifying Revenue and Cumulative Revenue Ledger"},{"page":165,"startToken":61955,"endToken":61963,"text":"Schedule 5 - 4 \n \nPresent Worth and Annualization Calculation"},{"page":166,"startToken":61963,"endToken":61971,"text":"Schedule 5 - 5 \n \nExpense and Capital Structure Inputs"},{"page":167,"startToken":61971,"endToken":61977,"text":"Schedule 5 - 6 \n \nTwenty-Year Depreciation Schedule"},{"page":168,"startToken":61977,"endToken":61984,"text":"i \n \n \n \nAppendix VI  LARGE LOAD INTERCONNECTION PROCEDURES"},{"page":169,"startToken":61984,"endToken":62283,"text":"ii \n \nTABLE OF CONTENTS  \n \n Page No. \nSection 1.  Objectives and Applicability .................................................................1 \n \n1.1 Objectives……………………………………………………………….1 \n \n \n1.2 Applicability……………………………………………………………. 1 \n \nSection 2. \nDefinitions ...............................................................................................1 \n \n \nSection 3. \nGeneral Provisions Applicable to All Interconnection Requests.....6  \n \n \n \n3.1 Interconnection Requests ......................................................................6 \n \n3.2 Transmission Interconnection Service .................................................6 \n \n3.2.1 \nThe Product .............................................................................6 \n \n3.2.2 \nNo Applicability to Transmission Service.............................7 \n \n \n3.2.3 \nRoles and Responsibilities ......................................................7 \n \n3.3 Comparability ........................................................................................7 \n \n3.4 Base Case Data .......................................................................................8 \n \n3.5 Coordination with Affected Systems ....................................................8 \n \n3.6  Capacity of the Large Load ..................................................................8 \n \n \n3.7  Proposed Service Commencement Date ..............................................9 \n \n \n3.7.1 \nInterconnection Request .........................................................9 \n \n \n3.7.2 \nAfter Start of the Large Load Interconnection Study .........9 \n3.8 Queue Position ...........................................................................................10 \n3.9 Withdrawal .............................................................................................10 \n \n3.10 Withdrawal Penalty ................................................................................11 \n        3.10.1  Calculation of the Withdrawal Penalty.....................................11 \n3.11 Standards for Co-located Inverter Based Generating Facilities ........12 \n \n \nSection 4. Large Load Study Process ........................................................................12 \n \n4.1 Timing for Submitting Interconnection Requests ..............................12 \n \n \n4.2 Processing of Interconnection Request ................................................12 \n \n4.2.1 \nInitiating an Interconnection Request ..................................13 \n \n4.2.1.1 Use of Interconnection Study Deposit ................................13 \n \n \n \n4.3 Validation of Interconnection Request ................................................14 \n \n4.3.1 \nAcknowledgment of Interconnection Request......................14 \n \n4.3.2 \nDeficiencies in Interconnection Request ...............................14 \n \n4.4   Potential Deferral of the Interconnection Studies ................................15 \n4.5 Scoping Meeting .....................................................................................15 \n \n4.6 Interconnection Studies .........................................................................16 \n \n4.6.1 \nLarge Load Interconnection Study .......................................17 \n \n4.6.1.1  Scope of the Large Load Interconnection Study .................17 \n \n4.6.1.2  Timing of the Large Load Interconnection Study Results .18 \n \n4.6.1.3   Large Load Interconnection Study Report Meeting .........19 \n \n4.6.1.4 Increase in the Commercial Readiness Deposit ...................19 \n4.6.1.5  Restudy....................................................................................20 \n4.6.1.6  Modifications ..........................................................................20"},{"page":170,"startToken":62283,"endToken":62496,"text":"iii \n \n4.6.2     Optional Flexible Interim Load Interconnection (FILI) Study and \nAgreement ...............................................................................................21 \n4.6.3     Additional Studies .....................................................................23 \n \n4.6.4     Financing of Participating TO’s Interconnection Facilities and Large \nLoad Network Upgrades .......................................................................24 \n4.7 Interconnection Financial Security ......................................................24 \n \n4.7.1 \nTypes of Interconnection Financial Security ........................24 \n \n \n \nSection 5. \nLarge Load Interconnection Agreement .............................................25 \n \n5.1 Tender.....................................................................................................25 \n5.2   Negotiation ...............................................................................................25 \n \n5.3 Execution and Filing ..............................................................................26 \n5.4   Commencement of Interconnection Activities .....................................27 \n \n \nSection 6. \nConstruction of Participating TO’s Interconnection Facilities \n \n and Large Load Network Upgrades ....................................................27 \n \n6.1 Schedule..................................................................................................27 \n6.2 Construction Sequencing.......................................................................27 \n \n6.2.1 \nGeneral .....................................................................................27 \n \n6.2.2 \nAdvancing Construction of  \nLarge Load Network Upgrades that are Part of an Expansion Plan of the \nParticipating TO ....................................................................................27 \n \n6.3 Special Provisions for Affected Systems ..............................................28 \n \n \nSection 7. \nMiscellaneous..........................................................................................28 \n \n7.1 Confidentiality ........................................................................................28 \n \n7.1.1 \nScope.........................................................................................28 \n \n7.1.2 \nRelease of Confidential Information .....................................29 \n \n7.1.3 \nRights .......................................................................................29 \n \n7.1.4 \nNo Warranties .........................................................................29 \n \n7.1.5 \nStandard of Care .....................................................................30 \n \n7.1.6 \nOrder of Disclosure .................................................................30 \n \n7.1.7 \nRemedies ..................................................................................30 \n \n7.1.8 \nDisclosure to FERC, its Staff, or a State ...............................30 \n \n7.2 Disputes ................................................................................................31 \n7.2.1 \nSubmission ...............................................................................31 \n \n \nAttachment 1 – Interconnection Request Form"},{"page":171,"startToken":62496,"endToken":62896,"text":"1 \n \n \n \n LARGE LOAD INTERCONNECTION PROCEDURES (LLIP) \n \n \nSection 1. \nObjectives and Applicability  \n1.1 Objectives \n \nThe objective of this LLIP is to implement requirements for Large Load interconnections to the \nParticipating TO’s Transmission System pursuant to the TO Tariff.  For purposes of this LLIP, \nthe “Participating TO” is DesertLink, LLC (“DesertLink”), and the “TO Tariff” is the \nDesertLink, LLC Transmission Owner Tariff.  Because DesertLink is a Non-Load-Serving \nParticipating TO and has no End-Use Customers, a Large Load interconnecting under this LLIP \nwill not be a retail transmission customer of the Participating TO.   \n \n1.2 Applicability  \n \nThe LLIP is applicable to a Large Load Interconnection Customer that is either (1) proposing to \ninterconnect a Large Load to the Participating TO’s Transmission System; (2) seeking to \nincrease the capacity of an existing Large Load processed under the LLIP; or (3) with respect to \nan existing load interconnected to the Participating TO’s Transmission System that was not \nprocessed under the LLIP, seeking an increase of 50 MW or greater.  This LLIP only applies to \ncompleted Interconnection Requests submitted after the effective date of this Appendix VI to the \nTO Tariff.  Consistent with Section 10A of the TO Tariff, all requests for ECLL Interconnection \nshall be directed to the Participating TO.  An Interconnection Request submitted under this LLIP \nshall constitute the ECLL Interconnection Application, and the Interconnection Studies and the \nLarge Load Interconnection Agreement under this LLIP shall constitute the study process and \nthe ECLL Interconnection Agreement, respectively, for purposes of Section 10A of the TO \nTariff.  \n \n \nSection 2. \nDefinitions  \n \nTerms used in this LLIP with initial capitalization shall have the meanings set forth below.  The \nsingular of any definition shall include the plural and the plural shall include the singular.  If a \nterm with initial capitalization used herein is not defined, such term shall have the meanings \nascribed to such term in Section 3 of the TO Tariff.   \n \n \nAffected System shall mean an electric system other than the Participating TO’s \nTransmission System that may be affected by the proposed interconnection.   \n \n \nAffected System Operator shall mean the entity that owns or operates an Affected System, \nand includes an Affected System Owner as defined in any Cost Recovery Agreement.   \n \n \n \n \nApplicable Laws and Regulations shall mean all duly promulgated applicable federal, state \nand local laws, regulations, rules, ordinances, codes, decrees, judgments, directives, or judicial or \nadministrative orders, permits and other duly authorized actions of any Governmental Authority."},{"page":172,"startToken":62896,"endToken":63335,"text":"2 \n \nBase Case shall mean data including, but not limited to, base power flow, short circuit and \nstability data bases, underlying load, generation, and transmission facility assumptions, \ncontingency lists, including relevant remedial action schemes, and transmission diagrams used to \nperform the Interconnection Studies.  The Base Case may include Critical Energy Infrastructure \nInformation (as that term is defined by FERC).  The Base Case may include transmission \nfacilities as approved by the Participating TO or ISO, as applicable, Reliability Network \nUpgrades that are included in a signed interconnection agreement, Large Load Network \nUpgrades, Large Loads and any co-located generation, and load forecast. The Base Case may \nalso include generation facilities that (i) are directly interconnected to a Distribution System or \nthe ISO Controlled Grid; (ii) are interconnected to Affected Systems and may have an impact on \nthe Interconnection Request; (iii) have a pending request to interconnect to a Distribution System \nor an Affected System; or (iv) are not interconnected to a Distribution System or the ISO \nControlled Grid, but are subject to the terms and conditions of a fully executed interconnection \nagreement (or its equivalent predecessor agreement) or for which an unexecuted interconnection \nagreement (or its equivalent predecessor agreement) has been requested to be filed with FERC.   \n \n \nBusiness Day shall mean Monday through Friday, excluding Federal Holidays. \n \n \nCalendar Day shall mean any day including Saturday, Sunday or a Federal Holiday.   \n \nCommercial Readiness Deposit shall mean a deposit paid as set forth in LLIP Sections \n4.2.1 and 4.6.1.4. \n \n \nConfidential Information shall mean any confidential, proprietary or trade secret \ninformation of a plan, specification, pattern, procedure, design, device, list, concept, policy or \ncompilation relating to the present or planned business of a Party, which is designated as \nconfidential by the Party supplying the information, whether conveyed orally, electronically, in \nwriting, through inspection, or otherwise. \n \n \nCost Recovery Agreement shall have the meaning set forth in Section 3 of the TO Tariff. \n \n \nDispute Resolution shall mean the applicable procedure for resolution of a dispute between \nthe Parties as described in Section 14 of the TO Tariff, including, as applicable, the ISO ADR \nProcedures.  \n \n \nFlexible Interim Load Interconnection (FILI) Service shall have the meaning set forth in \nSection 3 of the TO Tariff. \n \n \nFILI Study shall mean the study performed by the Participating TO pursuant to LLIP \nSection 4.6.2 to determine the availability of Interim Firm Interconnection Service and FILI \nService. \n \n \nInterconnection Financial Security shall mean any of the financial instruments listed in \nLLIP Section 4.7.1 provided by the Large Load Interconnection Customer to comply with its \nobligations under the LLIP or the Large Load Interconnection Agreement."},{"page":173,"startToken":63335,"endToken":63785,"text":"3 \n \n \nInterconnection Request shall mean a request, in the form of Attachment 1 to Appendix VI \nto the TO Tariff, to interconnect a new Large Load, or to increase the capacity of, or make a \nMaterial Modification to the operating characteristics of, an existing Large Load that is \ninterconnected with the Participating TO’s Transmission System. \n \n \nInterconnection Study shall mean any of the following studies: the Large Load \nInterconnection Study, the FILI Study, restudies, and any additional studies performed pursuant \nto LLIP Section 4.6.3. \n \n \nInterconnection Study Deposit shall mean the cash deposit provided to the Participating \nTO under LLIP Section 4.2.1 as a requirement of a valid Interconnection Request to be used to \noffset the cost of the Interconnection Studies. \n \nLarge Load Capacity shall mean the maximum capacity of the Large Load at the Point of \nInterconnection.  \n \nLarge Load Customer shall mean the End-User that owns, operates, or proposes to develop \nthe Large Load and receives, or will receive, retail transmission service from the Large Load \nInterconnection Customer, and shall be the Large Load Customer for purposes of the TO Tariff \nand any Cost Recovery Agreement. \n \nLarge Load Interconnection Agreement shall mean the interconnection agreement \nbetween the Participating TO and the Large Load Interconnection Customer, developed by the \nParticipating TO consistent with the TO Tariff and the results of the Interconnection Studies and \nnegotiated between the Parties pursuant to LLIP Section 5, which sets forth the terms and \nconditions governing the interconnection of the Large Load to the Participating TO’s \nTransmission System, including, without limitation, cost responsibility, payment provisions, cost \nrecovery, and financial security for the Participating TO’s Interconnection Facilities and Large \nLoad Network Upgrades, as it may be amended from time to time. The Large Load \nInterconnection Agreement shall constitute the ECLL Interconnection Agreement for purposes of \nthe TO Tariff, as applicable, and shall be filed with FERC by the Participating TO to the extent \nrequired. For purposes of the TO Tariff, the Participating TO’s Interconnection Facilities and \nLarge Load Network Upgrades identified in the Large Load Interconnection Agreement shall \ntogether constitute the ECLL Interconnection Facilities. \n \nLarge Load Interconnection Customer shall mean an Eligible Customer for Large Load \n(“ECLL”), as defined in Section 3 of the TO Tariff, that proposes to interconnect its facilities \nwith the Participating TO’s Transmission System for the purpose of providing retail transmission \nservice to a Large Load. \n \nLarge Load Interconnection Customer Interconnection Facilities shall mean all facilities \nand equipment owned, controlled, or operated by the Large Load Interconnection Customer or \nthe Large Load Customer up to the Point of Change of Ownership as identified in the Large \nLoad Interconnection Agreement, including any modifications, additions or upgrades to such \nfacilities and equipment."},{"page":174,"startToken":63785,"endToken":64264,"text":"4 \n \n \n \nLarge Load Interconnection Procedures (LLIP) shall mean the interconnection \nprocedures applicable to an Interconnection Request set forth in this Appendix VI to the TO \nTariff. \n \nLarge Load Interconnection Study shall mean an engineering study conducted by the \nParticipating TO for a Large Load Interconnection Customer under the LLIP that evaluates the \nimpact of the proposed interconnection on the safety and reliability of Participating TO’s \nTransmission System and, if applicable, an Affected System. The Large Load Interconnection \nStudy will also determine a list of facilities (including Participating TO’s Interconnection \nFacilities and Large Load Network Upgrades), the cost of those facilities, and the time required \nto interconnect the Large Load with the Participating TO’s Transmission System. The scope of \nthe study is defined in LLIP Section 4.6.1.1. \n \nLarge Load Network Upgrades shall mean the additions, modifications, and upgrades to \nthe ISO Controlled Grid at or beyond the Point of Interconnection necessary to serve one or more \nLarge Loads safely and reliably that are identified through the Large Load Interconnection Study \nand submitted to the ISO for concurrence pursuant to Section 25.7 of the ISO Tariff. Large Load \nNetwork Upgrades do not include Participating TO’s Interconnection Facilities. To the extent a \nLarge Load Network Upgrade is owned or to be constructed by the Participating TO and is \nidentified in Schedule 1 to a Cost Recovery Agreement, such Large Load Network Upgrades \nshall constitute Large Load-Driven Upgrades, as defined in that Cost Recovery Agreement.  \n \nLarge Load Study Process Agreement shall mean the agreement, developed and tendered \nby the Participating TO pursuant to LLIP Section 4.5, entered into by the Large Load \nInterconnection Customer and the Participating TO which sets forth the Parties’ agreement to \nperform Interconnection Studies under the LLIP. \n \n \nMaterial Modification shall mean those modifications that have a material impact on the \ncost or timing of any Interconnection Request, or any other valid interconnection request to the \nParticipating TO or the ISO, with an equal or later Queue Position date.  \n \n \n \nParticipating TO’s Interconnection Facilities shall mean all facilities and equipment \nowned, controlled, or operated by the Participating TO from the Point of Change of Ownership \nto the Point of Interconnection as identified in the Large Load Interconnection Agreement, \nincluding any modifications, additions or upgrades to such facilities and equipment.  \nParticipating TO’s Interconnection Facilities are transmission facilities but are not controlled by \nthe ISO.  Participating TO’s Interconnection Facilities are sole use facilities and shall not include \nLarge Load Network Upgrades.  \n \nParticipating TO’s Transmission System shall mean the facilities owned and operated by \nthe Participating TO and that have been placed under the ISO’s Operational Control, which \nfacilities form part of the ISO Controlled Grid. \n \nPoint of Change of Ownership shall mean the point, as set forth in the Large Load \nInterconnection Agreement, where the Large Load Interconnection Customer's interconnection \nfacilities connect to the Participating TO’s Interconnection Facilities."},{"page":175,"startToken":64264,"endToken":64721,"text":"5 \n \n \n \nPoint of Interconnection shall mean the point, as set forth in the Large Load \nInterconnection Agreement, where the Participating TO’s Interconnection Facilities connect to \nthe Participating TO’s Transmission System.  For purposes of the TO Tariff, the Point of \nInterconnection shall be the Point of Withdrawal for the Large Load. \n \n  \nQueue Position shall mean the order of a valid Interconnection Request, relative to all other \npending valid Interconnection Requests, established pursuant to LLIP Section 3.8. \n \n \nReasonable Efforts shall mean, with respect to an action required to be attempted or taken \nby a Party under the LLIP or the Large Load Interconnection Agreement, efforts that are timely \nand consistent with Good Utility Practice and are otherwise substantially equivalent to those a \nParty would use to protect its own interests. \n \nReport Meeting shall mean the meeting among the Participating TO, the Large Load \nInterconnection Customer, and if applicable, the ISO and other Affected System Operators to \ndiscuss the results of the Interconnection Studies as set forth in the LLIP.  \n \nScoping Meeting shall mean the meeting between representatives of the Large Load \nInterconnection Customer and Participating TO, and if applicable, the ISO, conducted for the \npurpose of discussing alternative interconnection options, to exchange information including any \ntransmission data and earlier study evaluations that would be reasonably expected to impact such \ninterconnection options, to analyze such information, and to determine the potential feasible \nPoints of Interconnection.  \n \nService Commencement Date shall mean the date the Large Load is initially operated in \nparallel with the Participating TO’s Transmission System and transmission interconnection \nservice is provided to the Large Load Interconnection Customer pursuant to the terms of an \nexecuted Large Load Interconnection Agreement. For purposes of any Cost Recovery \nAgreement, the Service Commencement Date shall be the Large Load Service Commencement \nDate specified in Schedule 1 to that agreement.  \n \nSite Control shall have the meaning set forth in Section 3 of the TO Tariff. \n \nSystem Protection Facilities shall mean the equipment, including necessary protection \nsignal communications equipment, that protects (1) the Participating TO’s Transmission System, \nParticipating TO’s Interconnection Facilities, ISO Controlled Grid, and Affected Systems from \nfaults or other electrical disturbances occurring at the Large Load and (2) the Large Load from \nfaults or other electrical system disturbances occurring on the ISO Controlled Grid, Participating \nTO’s Interconnection Facilities, and Affected Systems or on other delivery systems or other \ngenerating systems to which the ISO Controlled Grid is directly connected. \n \nTransmission Interconnection Service shall mean the service provided by the Participating \nTO associated with interconnecting the Large Load to the Participating TO’s Transmission \nSystem and enabling the Large Load Interconnection Customer to receive electric energy at the \nPoint of Interconnection, pursuant to the terms of the Large Load Interconnection Agreement and \nthe TO Tariff."},{"page":176,"startToken":64721,"endToken":65142,"text":"6 \n \n \nWithdrawal Penalty shall mean the penalty assessed by Participating TO to a Large Load \nInterconnection Customer that chooses to withdraw or is deemed withdrawn from Participating \nTO’s interconnection queue or whose Large Load does not otherwise reach its Service \nCommencement Date. The calculation of the Withdrawal Penalty is set forth in LLIP Section \n3.10.1. \n \nSection 3. \nGeneral Provisions Applicable to All Interconnection Requests \n \n \n3.1 \nInterconnection Requests \nA Large Load Interconnection Customer shall submit to Participating TO an \nInterconnection Request in the form of Attachment 1 to this LLIP for processing \nunder the LLIP.  Consistent with Section 10A.2.1 of the TO Tariff, the Large \nLoad Interconnection Customer shall send a copy of the Interconnection Request \nto the ISO, and the Interconnection Request and all supporting documentation \nshall be submitted electronically to the Participating TO in the manner posted on \nthe Participating TO’s public website.   \n \nAn Interconnection Request for the expansion of capacity of an existing Large \nLoad shall be treated the same as an Interconnection Request for a new Large \nLoad pursuant to this LLIP.  \n \nCo-located generation serving a Large Load that will not export to the ISO \nControlled Grid shall be interconnected in accordance with the generator \ninterconnection rules of the applicable ECLL, as approved by its Local \nRegulatory Authority (including, for a UDC subject to the jurisdiction of the \nCPUC, CPUC Electric Rule 21), consistent with Section 10A.5 of the TO Tariff; \nprovided that, where such co-located generation is included in the Interconnection \nRequest, the Participating TO will evaluate its incremental impacts on the \nParticipating TO’s Transmission System as part of the LLIP study process. Co-\nlocated generation that will export to the ISO Controlled Grid is required to \nsubmit a generator interconnection request to the ISO in accordance with Section \n25.7.6 of the ISO Tariff for evaluation of the proposed generator interconnection \nand the Large Load will be evaluated pursuant to the LLIP.  For a Large Load co-\nlocated with an exporting generating facility, the ISO will be a party to a pro \nforma agreement that bridges the generator’s Large Generator Interconnection \nAgreement with the Large Load Interconnection Agreement, or will negotiate a \nnon-conforming Large Generator Interconnection Agreement, consistent with \nSection 10A.5 of the TO Tariff. \n \n3.2 \nTransmission Interconnection Service \n \n3.2.1 The Product.  Transmission Interconnection Service allows Large Load \nInterconnection Customer to connect the Large Load to the Participating \nTO’s Transmission System and be eligible to receive electric energy and \ncapacity from the ISO Controlled Grid."},{"page":177,"startToken":65142,"endToken":65502,"text":"7 \n \n3.2.2 No Applicability to Transmission Service.  Nothing in this LLIP shall \nconstitute a request for transmission service or confer upon a Large Load \nInterconnection Customer any right to receive transmission service.   \n \n3.2.3 Roles and Responsibilities. \n \n3.2.3.1 Each Interconnection Request will be subject to the direction and \noversight of the Participating TO.  The Participating TO will \nconduct or cause to be performed the required Interconnection \nStudies and any additional studies the Participating TO determines \nto be reasonably necessary.  The analysis of impacts on, and \nupgrades required to, the Participating TO’s Transmission System \nwill be performed by the Participating TO and will be subject to \nreview and concurrence by the ISO.  The Participating TO will \nperform all required studies related to the Participating TO’s \nTransmission System and will coordinate with Affected System \nOperators in accordance with LLIP Section 3.5. \n \n3.2.3.2 The Participating TO will complete or cause to be completed all \nstudies as required within the timelines provided in this LLIP. \n \n \n3.2.3.3 Each Large Load Interconnection Customer shall pay the actual \ncosts of all Interconnection Studies, and any additional studies the \nParticipating TO determines to be reasonably necessary in \nresponse to the Interconnection Request.  The Participating TO \nshall reimburse the ISO for the actual cost of any portion of the \nInterconnection Studies that the ISO performs related to the ISO \nControlled Grid, as applicable.  \n \n \n3.2.3.3.1 The Participating TO shall issue invoices for \nInterconnection Studies that shall include a detailed and \nitemized accounting of the cost of each Interconnection \nStudy.  Whenever the actual cost of performing the \nInterconnection Studies exceeds the Interconnection \nStudy Deposit, the Large Load Interconnection Customer \nshall pay the undisputed difference in accordance with the \nParticipating TO issued invoice within thirty (30) \nCalendar Days.  The Participating TO shall not be \nobligated to continue to have any studies conducted \nunless the Large Load Interconnection Customer has paid \nall undisputed amounts in compliance herewith. \n \n3.3 \nComparability \nParticipating TO shall receive, process and analyze all Interconnection Requests \nin a timely manner as set forth in this LLIP.  Participating TO will use the same"},{"page":178,"startToken":65502,"endToken":65940,"text":"8 \n \nReasonable Efforts in processing and analyzing Interconnection Requests from all \nLarge Load Interconnection Customers, whether the Large Load is owned by \nParticipating TO and its Affiliates or by a third party.   \n \n3.4 \nBase Case Data \nParticipating TO shall provide Base Case data to a Large Load Interconnection \nCustomer upon request subject to confidentiality provisions in LLIP Section 7.1. \nParticipating TO shall provide base power flow, short circuit databases, including \nall underlying assumptions, and contingency list used in the Large Load \nInterconnection Customer’s Interconnection Studies.  Participating TO is \npermitted to require that the Large Load Interconnection Customer sign a \nconfidentiality agreement before the release of commercially sensitive \ninformation or Critical Energy Infrastructure Information in the Base Case data.  \nSuch Base Cases may include all (i) Large Loads, (ii) generation projects, and (iii) \ntransmission projects, including merchant transmission projects that are proposed \nfor the Participating TO’s Transmission System for which a transmission \nexpansion plan has been submitted and approved by the applicable authority. \n \n \n3.5 \nCoordination with Affected Systems \nThe Participating TO will notify the Affected System Operators that are \npotentially affected by a Large Load Interconnection Customer’s Interconnection \nRequest.  The Participating TO will coordinate the conduct of any studies \nrequired to determine the impact of the Interconnection Request on Affected \nSystems with Affected System Operators and, if possible, include those results (if \navailable) in its applicable Interconnection Study within the time frame specified \nin this LLIP.  Participating TO will include such Affected System Operators in all \nmeetings held with Large Load Interconnection Customer as required by this \nLLIP.  Large Load Interconnection Customer will cooperate with Participating \nTO in all matters related to the conduct of studies and the determination of \nmodifications to Affected Systems.  If an Affected System Operator, that has been \ninformed its system is an Affected System refuses to cooperate with the \nParticipating TO with whom interconnection has been requested in all matters \nrelated to the conduct of studies and the determination of whether modifications \nto its Affected System are necessary to avoid adverse impacts, it waives any right \nin any fora that the Participating TO’s provision of service has adversely impacted \nsuch Affected System Operator. \n \n3.6 \nCapacity of the Large Load  \n \nThe Interconnection Request shall be evaluated using the maximum capacity \nrequested by the Large Load Interconnection Customer.  However, if the \nmaximum capacity that the Large Load is capable of receiving is greater than the \nmaximum capacity requested by the Large Load Interconnection Customer, the \nLarge Load Interconnection Customer will be required to limit the Large Load \ncapacity to no greater than the amount requested (e.g., through use of a control"},{"page":179,"startToken":65940,"endToken":66376,"text":"9 \n \nsystem, power relay(s), or other similar device settings or adjustments), and the \nLarge Load Interconnection Customer must obtain the Participating TO’s \nagreement, with such agreement not to be unreasonably withheld, that the manner \nin which the Large Load Interconnection Customer proposes to implement such a \nlimit will not adversely affect the safety and reliability of the Participating TO’s \nTransmission System.  If the Participating TO does not so agree, then the \nInterconnection Request must be withdrawn or revised to specify the maximum \ncapacity that the Large Load is capable of receiving.    Furthermore, nothing in \nthis section shall prevent a Participating TO from considering a capacity higher \nthan the limited capacity, if appropriate, when evaluating system protection \nimpacts. \n \n3.7 \nProposed Service Commencement Date \nThe  proposed Service Commencement Date of the new Large Load or increase in \ncapacity of the existing Large Load shall not exceed seven years from the date the \nInterconnection Request is received by Participating TO for those Interconnection \nRequests studied in accordance with the Large Load Interconnection Procedures, \nunless Large Load Interconnection Customer demonstrates and the Participating \nTO agrees, such agreement not to be unreasonably withheld, that engineering, \npermitting and construction of the new Large Load or increase in capacity of the \nexisting Large Load will take longer than the seven-year period.    \n \n3.7.1 Interconnection Request.  If the proposed Service Commencement Date in \nthe Interconnection Request is more than seven years from the date the \nInterconnection Request is received by the Participating TO, the Large Load \nInterconnection Customer must demonstrate, subject to the Participating TO’s \nagreement, such agreement not to be unreasonably withheld, that the required \nengineering, permitting and construction of the Large Load will take longer than \nthe seven-year period.  \n \n3.7.2 After Start of the Large Load Interconnection Study.  Any request to \nextend the Service Commencement Date after commencement of the Large Load \nInterconnection Study under the LLIP, or following execution of a Large Load \nInterconnection Agreement, shall be subject to the following: \n \n(i) Requested extension does not exceed seven years from Service \nCommencement Date in the original Interconnection Request.  A request \nto extend the Service Commencement Date that does not exceed seven \nyears from the Service Commencement Date in the original \nInterconnection Request is subject to the modification assessment process \nspecified in LLIP Section 4.6.1.6.1.  \n \n(ii) Requested extension exceeds seven years from Service Commencement \nDate in the original Interconnection Request.  A request to extend the \nService Commencement Date that exceeds seven years from the Service \nCommencement Date in the original Interconnection Request shall (a) \ndemonstrate, subject to the Participating TO’s agreement, such agreement"},{"page":180,"startToken":66376,"endToken":66791,"text":"10 \n \nnot to be unreasonably withheld, that engineering, permitting and \nconstruction of the new Large Load or increase in capacity of the existing \nLarge Load will take longer than the seven-year period, and (b) be subject \nto the modification assessment process specified in LLIP Section \n4.6.1.6.1. \n \nAny extension of the Service Commencement Date under this LLIP Section 3.7.2 \nshall not extend the Outside Date under any applicable Cost Recovery Agreement \nunless the parties to that agreement agree in writing to such extension. \n \n3.8   Queue Position \n \n           3.8.1 Assignment of Queue Position. \nParticipating TO shall assign a Queue Position as follows: the Queue \nPosition shall be assigned based upon the date and time of receipt of all \nitems required pursuant to the provisions of LLIP Section 4.2.1.   \n \n3.8.2 Higher Queue Position.  \nA higher Queue Position assigned to an Interconnection Request is one \nthat has been placed “earlier” in the queue in relation to another \nInterconnection Request that is assigned a lower Queue Position.  \n \n \n3.9 \nWithdrawal \nLarge Load Interconnection Customer may withdraw its Interconnection Request \nat any time by written notice of such withdrawal to Participating TO, and the \nParticipating TO will notify the ISO and Affected System Operators, if any, \nwithin three (3) Business Days of receipt of such a notice.  In addition, after \nconfirmation by the Participating TO of a valid Interconnection Request, if the \nLarge Load Interconnection Customer fails to adhere to all requirements of this \nLLIP, except as provided in LLIP Section 7.2 (Disputes), Participating TO shall \ndeem the Interconnection Request to be withdrawn and shall provide written \nnotice to Large Load Interconnection Customer of the deemed withdrawal within \nfive (5) Business Days and an explanation of the reasons for such deemed \nwithdrawal.  Upon receipt of such written notice, Large Load Interconnection \nCustomer shall have five (5) Business Days in which to either (i) respond with \ninformation or action that cures the deficiency, or (ii) support its position that the \ndeemed withdrawal was erroneous and notify the Participating TO of its intent to \npursue Dispute Resolution. \n \nFor an Interconnection Request under the LLIP, withdrawal shall result in the \nremoval of the Interconnection Request from the Interconnection Studies.  If a \nLarge Load Interconnection Customer disputes the withdrawal and removal from \nthe Interconnection Studies and has elected to pursue Dispute Resolution, Large \nLoad Interconnection Customer's Interconnection Request will not be considered \nin any ongoing Interconnection Study during the Dispute Resolution process."},{"page":181,"startToken":66791,"endToken":67196,"text":"11 \n \nIn the event of such withdrawal, Participating TO, subject to the provisions in \nLLIP Section 7.1, as applicable, shall provide, at Large Load Interconnection \nCustomer's request, all information that Participating TO developed for any \ncompleted study conducted up to the date of withdrawal of the Interconnection \nRequest. \n \n3.10 \nWithdrawal Penalty \n \nA Large Load Interconnection Customer with an Interconnection Request being \nprocessed under the LLIP will be subject to a Withdrawal Penalty if it withdraws \nits Interconnection Request or is deemed withdrawn, or the Large Load does not \notherwise achieve its Service Commencement Date, which date may be modified \nif the necessary Participating TO-owned facilities cannot be constructed on a \ntimeline that meets such date, unless: (1) the withdrawal does not have a material \nimpact on the cost or timing of any equal or later queued interconnection request; \n(2) Large Load Interconnection Customer withdraws after receiving Large Load \nInterconnection Customer’s most recent Interconnection Study report and the \nLarge Load Network Upgrade costs assigned to the Interconnection Request \nidentified in that report have increased by more than twenty-five percent (25%) \ncompared to costs identified in Large Load Interconnection Customer’s preceding \nInterconnection Study report; or (3) Large Load Interconnection Customer \nwithdraws after receiving an Interconnection Study report issued after completion \nof the initial Large Load Interconnection Study and the Large Load Network \nUpgrade costs assigned to the Interconnection Request identified in such \nInterconnection Study report have increased by more than one hundred percent \n(100%) compared to costs identified in the initial Large Load Interconnection \nStudy report. \n \n3.10.1 Calculation of the Withdrawal Penalty \n \nIf the Large Load Interconnection Customer withdraws its Interconnection \nRequest or is deemed withdrawn prior to the commencement of the Large \nLoad Interconnection Study, Large Load Interconnection Customer will \nnot be subject to a Withdrawal Penalty.  If Large Load Interconnection \nCustomer withdraws, is deemed withdrawn, or otherwise does not achieve \nits Service Commencement Date at any point after the commencement of \nthe Large Load Interconnection Study, that Large Load Interconnection \nCustomer’s Withdrawal Penalty will be the greater of: (1) the Large Load \nInterconnection Customer’s Interconnection Study Deposit required under \nLLIP Section 4.2.1; or (2) as follows in (a)–(c): \n \n(a) If Large Load Interconnection Customer withdraws or is deemed \nwithdrawn during the Large Load Interconnection Study or after \nreceipt of a Large Load Interconnection Study report, Large Load \nInterconnection Customer will be charged two (2) times the actual cost"},{"page":182,"startToken":67196,"endToken":67556,"text":"12 \n \nof the Large Load Interconnection Study performed for the Large Load \nInterconnection Customer. \n \n(b) If Large Load Interconnection Customer withdraws or is deemed \nwithdrawn after receipt of the draft Large Load Interconnection \nAgreement but before Large Load Interconnection Customer has \nexecuted a Large Load Interconnection Agreement or has requested \nthat its Large Load Interconnection Agreement be filed unexecuted, \nLarge Load Interconnection Customer will be charged ten percent \n(10%) of its estimated Large Load Network Upgrade costs as reflected \nin the most recently completed Interconnection Study.   \n \n(c) If Large Load Interconnection Customer has executed a Large \nLoad Interconnection Agreement or has requested that its Large Load \nInterconnection Agreement be filed unexecuted and subsequently \nwithdraws its Interconnection Request, the Large Load Interconnection \nCustomer’s Withdrawal Penalty will be calculated as set forth in the \nLarge Load Interconnection Agreement.   \n \nThe Commercial Readiness Deposit shall be retained as financial security \nfor the Withdrawal Penalty (if applicable) and, other than as set forth in \nthe Large Load Interconnection Agreement, any security not applied to the \nWithdrawal Penalty will be released to the Large Load Interconnection \nCustomer following withdrawal or the Service Commencement Date.  \nWhere a Cost Recovery Agreement applies, (i) any Commercial Readiness \nDeposit or Interconnection Financial Security provided for the same costs \nshall count toward, and shall not be duplicated by, the Construction \nSecurity required under the Cost Recovery Agreement, and (ii) any \nWithdrawal Penalty paid with respect to a Large Load Network Upgrade \nshall be credited against the Pre-In-Service Termination Costs payable \nunder the Cost Recovery Agreement for that upgrade, so that the \nParticipating TO does not recover the same costs more than once. \n \n3.11 \nStandards for Co-located Inverter Based Generating Facilities \n \nInverters used for the production, and/or later injection from storage, of electricity \nshall meet the inverter certification standards of UL-1741 and UL-1741 \nSupplement B. \n \nSection 4.  Large Load Study Process \n \n4.1 \nTiming For Submitting Interconnection Requests \nA Large Load Interconnection Customer may submit an Interconnection Request \nfor processing under the LLIP at any time during the year. The Participating TO, \nin coordination with the ISO, as applicable, will study the Interconnection \nRequest.   \n \n4.2 \nProcessing of Interconnection Request"},{"page":183,"startToken":67556,"endToken":67977,"text":"13 \n \n \n4.2.1 \nInitiating an Interconnection Request.  To initiate an \nInterconnection Request under the LLIP, Large Load Interconnection \nCustomer must submit all of the following: (i) an Interconnection Study \nDeposit of $250,000; (ii) a completed Interconnection Request in the form \nof Attachment 1 to the LLIP, including preferred Point of Interconnection \nand voltage level, all information required by Section 10A.2.1 of the TO \nTariff (other than any election of interim service, which shall be made in \naccordance with LLIP Section 4.6.2), and all other technical data; (iii) a \nCommercial Readiness Deposit equal to two times the Interconnection \nStudy Deposit described in this LLIP Section 4.2.1 in the form of an \nirrevocable letter of credit, cash, a surety bond, or other form of security \nthat is reasonably acceptable to Participating TO, in accordance with LLIP \nSection 4.7.1. This Commercial Readiness Deposit is refunded to Large \nLoad Interconnection Customer according to LLIP Section 3.10.1; \nhowever, the Participating TO shall be entitled to hold the Commercial \nReadiness Deposit until the Large Load Interconnection Customer’s Large \nLoad achieves its Service Commencement Date; and (iv) demonstration of \nSite Control.   \n \n4.2.1.1 Use of Interconnection Study Deposit.  The Interconnection \nStudy Deposit shall be applied to pay for prudent costs incurred by \nthe Participating TO, the ISO, or third parties at the direction of the \nParticipating TO or ISO, as applicable, to perform and administer \nthe Interconnection Studies.   \n \nIn the event a Large Load Interconnection Customer withdraws its \nInterconnection Request prior to the commencement of the Large \nLoad Interconnection Study, Large Load Interconnection Customer \nmust pay Participating TO the actual costs of processing its \nInterconnection Request. In the event a Large Load \nInterconnection Customer withdraws after commencement of the \nLarge Load Interconnection Study, Participating TO shall charge \nand Large Load Interconnection Customer shall pay the actual \ncosts of the Interconnection Studies.  \n \nAny difference between the Interconnection Study Deposit and the \nactual cost of the Interconnection Studies shall be paid by or \nrefunded to the Large Load Interconnection Customer. Any \ninvoices for Interconnection Studies shall include a detailed and \nitemized accounting of the cost of each Interconnection Study. \nLarge Load Interconnection Customers shall pay any such \nundisputed costs within thirty (30) Calendar Days of receipt of an \ninvoice. If Large Load Interconnection Customer fails to pay such \nundisputed costs within the time allotted, its Interconnection \nRequest shall be deemed withdrawn and will be subject to a \nWithdrawal Penalty pursuant to LLIP Section 3.10.1."},{"page":184,"startToken":67977,"endToken":68406,"text":"14 \n \n \nThe Participating TO will reimburse the ISO or third parties, as \napplicable, for all work performed on behalf of the withdrawn \nInterconnection Request at the Participating TO’s direction. The \nLarge Load Interconnection Customer must pay all monies due \nbefore it is allowed to obtain any Interconnection Study data or \nresults. \n \n \n4.3 \nValidation of Interconnection Request \n \n4.3.1 Acknowledgment of Interconnection Request.  Participating TO shall \nnotify the Large Load Interconnection Customer within ten (10) Business \nDays of receipt of the Interconnection Request, which notice shall state \nwhether the Interconnection Request is deemed valid.   \n \n4.3.2 Deficiencies in Interconnection Request.  An Interconnection Request \nwill not be considered to be a valid request until all items in LLIP Section \n4.2.1 have been received by Participating TO and deemed valid by the \nParticipating TO.  If an Interconnection Request fails to meet the \nrequirements set forth in LLIP Section 4.2.1, Participating TO shall \ninclude in its notification to the Large Load Interconnection Customer \nunder LLIP Section 4.3.1 the reasons for such failure and that the \nInterconnection Request does not constitute a valid request.  Consistent \nwith Section 10A.2.3 of the TO Tariff, the Participating TO will attempt to \nremedy deficiencies in the Interconnection Request through informal \ncommunications with the Large Load Interconnection Customer, and the \nLarge Load Interconnection Customer shall provide Participating TO the \nadditional requested information needed to constitute a valid request.  \nWhenever the additional requested information is provided by the Large \nLoad Interconnection Customer, the Participating TO shall notify the \nLarge Load Interconnection Customer within five (5) Business Days of \nreceipt of the additional requested information whether the \nInterconnection Request is valid.  If the Interconnection Request continues \nto fail to meet the requirements set forth in LLIP Section 4.2.1, the \nParticipating TO shall include in its notification to the Large Load \nInterconnection Customer the reasons for such failure.  If an \nInterconnection Request has not been deemed valid, the Large Load \nInterconnection Customer must submit all information necessary to meet \nthe requirements of LLIP Section 4.2.1 no later than twenty (20) Business \nDays after the date the original Interconnection Request was submitted, or \nten (10) Business Days after the Participating TO first provided notice that \nthe Interconnection Request was not valid, whichever is later.  \nInterconnection Requests that have not met the requirements of LLIP \nSection 4.2.1 within twenty (20) Business Days after the date the original \nInterconnection Request was submitted or ten (10) Business Days after the \nParticipating TO first provided notice that the Interconnection Request"},{"page":185,"startToken":68406,"endToken":68816,"text":"15 \n \nwas not valid, whichever is later, will be deemed invalid, will be returned \nto the Large Load Interconnection Customer in accordance with Section \n10A.2.3 of the TO Tariff, and will not be included in the LLIP.  \n \nInterconnection Requests deemed invalid under this LLIP Section 4.3.2 \nare not subject to LLIP Section 3.9.  Large Load Interconnection \nCustomers with invalid Interconnection Requests under this LLIP Section \n4.3.2 may seek relief under LLIP Section 7.2 by so notifying the \nParticipating TO within two (2) Business Days of the notice of invalidity. \n \n4.4     Potential Deferral of the Interconnection Studies \n \n           The Participating TO may defer commencement of the Large Load \nInterconnection Study when it determines, using Good Utility Practice and \nreasonable engineering judgment, that the Interconnection Request cannot be \nstudied meaningfully until other pending study results for higher-queued projects \nare available. \n \n           Within ten (10) Business Days after deeming an Interconnection Request valid \nunder LLIP Section 4.3.1, the Participating TO will notify the Large Load \nInterconnection Customer in writing if it is deferring the start of the \nInterconnection Studies. The notice will include: (i) information regarding the \npending studies; and (ii) the estimated start date of the Large Load \nInterconnection Study.  During the period of deferral, the Participating TO will \nprovide a monthly status update to the Large Load Interconnection Customer. \n \n \n4.5 \nScoping Meeting \nWithin fifteen (15) Business Days after the Participating TO notifies the Large \nLoad Interconnection Customer that the Interconnection Request has been \ndeemed valid as set forth in LLIP Section 4.3.2, the Participating TO shall \nestablish a date agreeable to the Large Load Interconnection Customer, and the \nISO, if applicable, for the Scoping Meeting.   \n \nThe purpose of the Scoping Meeting shall be to discuss reasonable Service \nCommencement Dates and alternative interconnection options, to exchange \ninformation including any transmission data that would reasonably be expected to \nimpact such interconnection options, to analyze such information and to \ndetermine the potential feasible Points of Interconnection and eliminate \nalternatives given resources and available information. The Scoping Meeting shall \nalso include discussion of a deferral of the Interconnection Studies in accordance \nwith LLIP Section 4.4.     \n \nThe Participating TO will bring to the meeting, as reasonably necessary to \naccomplish its purpose, such already available technical data, including, but not \nlimited to, (i) general facility loadings, (ii) general instability issues, (iii) general \nshort circuit issues, (iv) general voltage issues, and (v) general reliability issues."},{"page":186,"startToken":68816,"endToken":69282,"text":"16 \n \n \nThe Large Load Interconnection Customer will bring to the Scoping Meeting, in \naddition to the technical data form (Appendix A to Attachment 1) submitted with \nits Interconnection Request, any system studies previously performed.  The \nParticipating TO, the ISO, if applicable, and the Large Load Interconnection \nCustomer will also bring to the meeting personnel and other resources as may be \nreasonably required to accomplish the purpose of the meeting in the time \nallocated for the meeting.  On the basis of the meeting, the Large Load \nInterconnection Customer shall designate its Point of Interconnection.  The \nduration of the meeting shall be sufficient to accomplish its purpose. \n \nWithin five (5) Business Days after the Scoping Meeting, the Participating TO  \nshall tender to the Large Load Interconnection Customer a Large Load Study \nProcess Agreement developed by the Participating TO consistent with the TO \nTariff and this LLIP, which shall contain an outline of the scope of the Large \nLoad Interconnection Study, contain a non-binding good faith estimate of the cost \nto perform such study, and shall specify that the Large Load Interconnection \nCustomer is responsible for the actual cost of the Interconnection Studies, \nincluding reasonable administrative costs.  No later than thirty (30) Calendar Days \nafter the Scoping Meeting, the Large Load Interconnection Customer shall either \nexecute and deliver to the Participating TO  the Large Load Study Process \nAgreement or request that the Participating TO file it unexecuted with FERC, or \nthe Interconnection Request shall be deemed withdrawn.  If an unexecuted filing \nis requested, the Interconnection Studies will be paused until the Large Load \nStudy Process Agreement is made effective by FERC. \n \n4.6 \nInterconnection Studies \nThe Interconnection Studies shall consist of a Large Load Interconnection Study, \nany FILI Study requested pursuant to LLIP Section 4.6.2, and any additional \nstudies, including but not limited to those identified in LLIP Section 4.6.3 \nrequired for interconnection of the Large Load, and co-located generation not \nexporting to the ISO Controlled Grid, to the Participating TO’s Transmission \nSystem.    The analysis of impacts on, and upgrades required to, the Participating \nTO’s Transmission System will be performed by the Participating TO and will be \nsubject to the review and concurrence of the ISO in accordance with Section 25.7 \nof the ISO Tariff. The Interconnection Studies will identify Participating TO’s \nInterconnection Facilities and required Large Load Network Upgrades necessary \nto mitigate thermal overloads and voltage violations, and address short circuit, \nstability, and reliability issues associated with the requested Transmission \nInterconnection Service.  \n \nAll cost estimates for Participating TO’s Interconnection Facilities and Large \nLoad Network Upgrades, as applicable, contained in the Interconnection Studies \nwill be set forth in the Interconnection Study report in present dollar costs as well \nas time-adjusted dollar costs, adjusted to the estimated year of construction of the \ncomponents being constructed."},{"page":187,"startToken":69282,"endToken":69635,"text":"17 \n \n \nThe Participating TO will prepare an Interconnection Study report to document \nthe results of the Interconnection Studies.   \n \n4.6.1 Large Load Interconnection Study.  \n \n \n4.6.1.1  Scope of the Large Load Interconnection Study.  The Large \nLoad Interconnection Study will consist of a  short circuit analysis, \na power flow analysis, an electromagnetic transient (“EMT”) \nscreening, a non-binding good faith estimate of the scope and cost \nof the Participating TO’s Interconnection Facilities and Large Load \nNetwork Upgrades, and any other studies that are deemed \nnecessary. The Large Load Interconnection Study will also identify \nthe need for any additional studies (e.g., stability analysis, EMT \nstudy, etc.) to be performed as part of the scope of work set forth in \nthe Large Load Interconnection Agreement pursuant to LLIP \nSection 4.6.3.  When there is co-located generation not exporting \nto the ISO Controlled Grid and not subject to electrical short \ncircuit duty dependence, the Large Load Interconnection Study \nwill identify the impacts associated with the Large Load and any \nincremental impacts of the co-located generation.       \nThe Large Load Interconnection Study will consider the use of \nalternative transmission technologies including dynamic line \nratings, advanced power flow control devices, advanced \nconductors, and transmission switching, when evaluating \ntransmission solutions to accommodate new Large Loads and their \nassociated transmission system impacts.  If traditional network \nupgrades are selected instead of alternative transmission \ntechnologies, the Participating TO will provide a demonstration of \nwhy alternative transmission technologies are not feasible or would \nnot result in lower costs or a faster timeline for accommodating the \ninterconnection of the Large Load.  \nThe Large Load Interconnection Study shall state the assumptions \nupon which it is based, state the results of the analyses, and \nprovide the requirement or potential impediments to providing the \nrequested Transmission Interconnection Service, including an \nestimate of the cost and length of time that would be necessary to \ncorrect any problems identified in those analyses and implement \nthe Interconnection.   \n \nThe Large Load Interconnection Study shall provide a list of \nParticipating TO’s Interconnection Facilities and Large Load \nNetwork Upgrades, as applicable, that are required as a result of \nthe Interconnection Request."},{"page":188,"startToken":69635,"endToken":70022,"text":"18 \n \n4.6.1.2 Timing of the Large Load Interconnection Study Results.  The \nParticipating TO shall use Reasonable Efforts to complete the \nLarge Load Interconnection Study within ninety (90) Calendar \nDays after the execution of a Large Load Study Process Agreement \nor, if the Large Load Study Process Agreement is filed unexecuted, \nafter it is made effective by FERC.  The Participating TO will \nissue a Large Load Interconnection Study report to the Large Load \nInterconnection Customer. The Participating TO will share study \nresults with the ISO for review and concurrence.   \n \nAt any time the Participating TO determines that it will not meet \nthe required time frame for completing the Large Load \nInterconnection  Study, Participating TO shall notify the Large \nLoad Interconnection Customer as to the schedule status of the \nLarge Load Interconnection Study and provide an estimated \ncompletion date with an explanation of the reasons why additional \ntime is required. \n \nUpon request, the Participating TO shall provide the Large Load \nInterconnection Customer all supporting documentation, \nworkpapers and relevant pre-Interconnection Request and post-\nInterconnection Request power flow and short circuit databases for \nthe Large Load Interconnection Study, subject to confidentiality \narrangements consistent with LLIP Section 7.1. \n \nShould the Large Load Interconnection Customer provide written \ncomments on the Large Load Interconnection Study report at least \nfive (5) Business Days before the Report Meeting conducted to \ndiscuss the report, the Participating TO will address the written \ncomments in the Large Load Interconnection Study Report \nMeeting.  Should the Large Load Interconnection Customer \nprovide comments at any later time (up to the time of the Report \nMeeting), then such comments shall be considered informal \ninquiries to which the Participating TO will provide informal, \ninformational responses at the Report Meeting, to the extent \npossible.  \n \nThe Large Load Interconnection Customer may submit, in writing, \nadditional comments on the final Large Load Interconnection \nStudy report up to three (3) Business Days following the Report \nMeeting.  Based on any discussion at the Report Meeting and any \ncomments received from the Large Load Interconnection Customer \nor the ISO, the Participating TO will determine whether it is \nnecessary to follow the Large Load Interconnection Study report \nwith a revised study report.  The Participating TO will issue any \nsuch revised report to the Large Load Interconnection Customer no \nlater than fifteen (15) Business Days following the Report"},{"page":189,"startToken":70022,"endToken":70362,"text":"19 \n \nMeeting. If the ISO has not completed its review of the Large Load \nInterconnection Study report, the Participating TO shall delay its \ndetermination of whether a revised study report is required until \nthat review is complete. \n \n \n \n \n \n \n4.6.1.3 Large Load Interconnection Study Report Meeting.  A Report \nMeeting shall be held among the Participating TO, the ISO, if \napplicable, and the Large Load Interconnection Customer to \ndiscuss the results of the Large Load Interconnection Study, \nincluding assigned cost responsibility.  Any such Report Meeting \nwill be held within ten (10) Business Days of the date the Large \nLoad Interconnection Study report is provided to the Large Load \nInterconnection Customer.  \n \n4.6.1.4 Commercial Readiness Deposit.  Within thirty (30) Calendar \nDays after receiving the final Large Load Interconnection Study \nreport, the Large Load Interconnection Customer shall provide an \nadditional Commercial Readiness Deposit sufficient to bring the \naggregate Commercial Readiness Deposit to twenty percent (20%) \nof the Participating TO’s then-current estimated construction cost \nof the Large Load Network Upgrades identified in that report that \nare attributable to the Interconnection Request.  If the final Large \nLoad Interconnection Study report is revised following ISO \nreview, the required Commercial Readiness Deposit shall be \nadjusted to reflect twenty percent (20%) of the corresponding \nestimated construction cost identified in the revised final report, \nand any required increase shall be provided within thirty (30) \nCalendar Days after issuance of that report.  \n \n \nThe Commercial Readiness Deposit secures the Withdrawal \nPenalty and other pre-in-service obligations under this LLIP and \nthe Large Load Interconnection Agreement. It does not establish a \ndirect assignment of the Large Load Network Upgrade costs, \nconstitute a payment toward an Annual MTRC, reduce the Total \nRequired Revenue Commitment, or satisfy Operational Security \nunder a Cost Recovery Agreement. \n \nTo the extent a Commercial Readiness Deposit is in a form \npermitted under Schedule 3 of an applicable Cost Recovery \nAgreement, DesertLink may elect in writing to credit it dollar-for-\ndollar toward required Construction Security under that agreement. \nNo amount of Commercial Readiness Deposit may be applied or"},{"page":190,"startToken":70362,"endToken":70748,"text":"20 \n \ncredited more than once. Any portion not so credited shall be \nadministered and released under Sections 3.9 and 3.10 of this LLIP \nand the Large Load Interconnection Agreement. \n   \n4.6.1.5 Restudy. If restudy of the Large Load Interconnection Study is \nrequired due to a higher queued project dropping out of the queue, \nor a modification of a higher queued project subject to LLIP \nSection 4.6.1.6, Participating TO shall notify Large Load \nInterconnection Customer in writing. Such restudy shall take no \nlonger than forty-five (45) Calendar Days from the date of notice. \nAny cost of restudy shall be borne by the Large Load \nInterconnection Customer. \n \n4.6.1.6 Modifications.  At any time during the course of the \nInterconnection Studies, the Large Load Interconnection Customer, \nthe Participating TO, or the ISO, as applicable, may identify \nchanges to the planned interconnection that may improve the costs \nand benefits (including reliability) of the interconnection, and the \nability of the proposed change to accommodate the Interconnection \nRequest.  To the extent the identified changes are acceptable to the \nParticipating TO, the ISO, as applicable, and Large Load \nInterconnection Customer, such acceptance not to be unreasonably \nwithheld, Participating TO shall modify the configuration in \naccordance with such changes without altering the Interconnection \nRequest’s eligibility for participating in Interconnection Studies.          \n \n4.6.1.6.1 For any modifications other than those agreed upon under \nLLIP Section 4.6.1.6, the Large Load Interconnection \nCustomer must first request that Participating TO evaluate \nwhether such modification is a Material Modification.  In \nresponse to Large Load Interconnection Customer's \nrequest, Participating TO, in coordination with the ISO, if \napplicable, shall evaluate the proposed modifications prior \nto making them and inform Large Load Interconnection \nCustomer in writing of whether the modifications would \nconstitute a Material Modification.  The Participating TO \nmay, at its option, engage the services of the ISO to assist \nin the assessment of the modification.  Any change to the \nPoint of Interconnection shall constitute a Material \nModification.   \n \n \n \nThe Large Load Interconnection Customer shall provide \nthe Participating TO a $30,000 deposit for the modification \nassessment at the time the request is submitted.  Except as \nprovided below, any modification assessment will be \nconcluded, and a response provided to the Large Load \nInterconnection Customer in writing, within forty-five (45)"},{"page":191,"startToken":70748,"endToken":71104,"text":"21 \n \nCalendar Days from the date the Participating TO receives \nall of the following: 1) the Large Load Interconnection \nCustomer’s written notice to modify the project; 2) a \nnarrative description of the requested modification; 3) \ntechnical data required to assess the request, including an \nupdated technical data form (Appendix A to Attachment 1 \nto this LLIP), if requested by the Participating TO; 4) any \nadditional information requested by Participating TO; and \n5) payment of the $30,000 deposit.  If applicable, the \nParticipating TO shall coordinate the modification request \nwith the ISO.  If the modification assessment cannot be \ncompleted within that time period, the Participating TO \nshall notify the Large Load Interconnection Customer and \nprovide an estimated completion date with an explanation \nof the reasons why additional time is required.  The Large \nLoad Interconnection Customer will be responsible for the \nactual costs incurred by the Participating TO and, if \napplicable, the ISO in conducting the modification \nassessment.  If the actual costs of the modification \nassessment are less than the deposit provided by the Large \nLoad Interconnection Customer, the Large Load \nInterconnection Customer will be refunded the balance \nwithin thirty (30) Calendar Days of being invoiced.  If the \nactual costs of the modification assessment are greater than \nthe deposit provided by the Large Load Interconnection \nCustomer, the Large Load Interconnection Customer shall \npay the balance within thirty (30) Calendar Days of being \ninvoiced. \n \nIf the proposed modification is determined to be a Material \nModification by the Participating TO pursuant to the \nmodification assessment described above, the Large Load \nInterconnection Customer shall then either:  \n \n(i) \nwithdraw the proposed modification, or  \n \n(ii) withdraw the proposed modification and submit a \nnew Interconnection Request reflecting such \nmodification. \n \n4.6.2   Optional Flexible Interim Load Interconnection (FILI) Study and \nAgreement. If the Large Load Interconnection Study finds that the full \namount of the Interconnection Request cannot be accommodated prior to \nthe time that all ECLL Interconnection Facilities are in service, the Large \nLoad Interconnection Customer may request a FILI Study, by written \nnotice to the Participating TO within thirty (30) Calendar Days after \nreceipt of the final Large Load Interconnection Study report, to"},{"page":192,"startToken":71104,"endToken":71533,"text":"22 \n \ndetermine, consistent with Section 10A.4 of the TO Tariff, whether \nInterim Firm Interconnection Service and/or FILI Service may be \nprovided.  A Large Load Interconnection Customer may elect to be \nstudied only for Interim Firm Interconnection Service and not FILI \nService.  If the Large Load Interconnection Customer elects to proceed \nwith a FILI Study, the Participating TO shall use Reasonable Efforts to \ncomplete the FILI Study within sixty (60) Calendar Days after receipt of \nsuch request. Large Load Interconnection Customer will be responsible \nfor the actual costs of the FILI Study. The Participating TO will perform \nthe FILI Study. At any time the Participating TO determines that it will \nnot meet the required time frame for completing the FILI Study, \nParticipating TO shall notify the Large Load Interconnection Customer as \nto the schedule status of the FILI Study and provide an estimated \ncompletion date with an explanation of the reasons why additional time is \nrequired. \n \n \n \n The FILI Study will determine (i) the maximum amount of Interim Firm \nInterconnection Service, if any, that can be provided prior to completion \nof the Participating TO’s Interconnection Facilities and Large Load \nNetwork Upgrades; (ii) whether the Large Load Interconnection \nCustomer is eligible to receive FILI Service and the maximum amount of \nsuch service; (iii) the conditions and limitations of such service; (iv) the \nupgrades and the associated cost; and (v) the estimated duration required \nto provide the interim service. The Participating TO will share study \nresults with the ISO for review and concurrence.  The Participating TO \nshall update its analysis of the availability of FILI Service at least \nannually under the terms of the FILI Service Agreement, and the actual \namount of FILI Service available during any operating period shall be \ndetermined by the Participating TO through operational assessments \nconducted closer to real-time operating conditions, consistent with \nSection 10A.4 of the TO Tariff.  If requested by the Large Load \nInterconnection Customer within ten (10) Business Days of the date of \nthe issuance of the FILI Study report, a Report Meeting shall be \nscheduled among the Participating TO, the ISO, and the Large Load \nInterconnection Customer. \n \n \n \nThe Large Load Interconnection Customer should note the following \nconsiderations: \na) \nTemporary limits may be adjusted if unforeseen conditions arise. \nb) \nAdvance notice of non-firm load curtailment may not be possible. \nc) \nNon-firm load may be curtailed during planned or repair outages, \nwhich may last longer than 6 months. \nd) \nISO may have additional operational requirements. \ne) \nParticipating TO is not obligated to provide flexibility beyond \nwhat it can, in its sole judgment, manage operationally."},{"page":193,"startToken":71533,"endToken":71979,"text":"23 \n \nf) \nParticipating TO’s Interconnection Facilities costs for interim \ninterconnection service will be directly assigned to the Large Load \nInterconnection Customer. \ng) \nLarge Load Interconnection Customers not adhering to the \ncontractual agreement and conditions may be curtailed indefinitely.  \n \n4.6.2.1 FILI Service Agreement. If the Large Load Interconnection \nCustomer has elected FILI Service, as reflected in the Large Load \nInterconnection Agreement, the Large Load Interconnection \nCustomer shall ensure that, prior to the Service Commencement \nDate, the Large Load Customer executes, or requests to be filed \nunexecuted with FERC, a FILI Service Agreement with the \nParticipating TO and, as applicable, the ISO, developed by the \nParticipating TO consistent with Section 10A.4 of the TO Tariff \nand in accordance with ISO Tariff Section 25.7.2. The FILI \nService Agreement shall describe the circumstances in which the \nISO or Participating TO may temporarily curtail the Large Load \nreceiving FILI Service, and the mechanism the ISO or \nParticipating TO will use to perform the curtailment. The ISO will \npost such FILI Service Agreements on the ISO Website.  \n \n4.6.3   Additional Studies. The Participating TO may identify the need for \nadditional studies to comply with Applicable Reliability Standards. These \nadditional studies may include, but are not limited to, the following: \nstability analysis, variable load impact analysis, and EMT analysis.  The \nassociated new scope will be identified in the Large Load Interconnection \nStudy pursuant to LLIP Section 4.6.1.1. The additional studies will be \nperformed by the Participating TO as part of the scope of work set forth in \nthe Large Load Interconnection Agreement. The additional studies may \nresult in the identification of additional facilities scope and cost, and may \nrequire a revision to the schedule set forth in the Large Load \nInterconnection Agreement. The Large Load Interconnection Customer \nwill be responsible for providing the necessary technical information \nand/or models requested by the Participating TO to conduct the additional \nstudies. The Large Load Interconnection Customer will be responsible for \nthe costs of such studies.            \n \nIf an additional study results in the need to revise the scope of work of the \nLarge Load Network Upgrades identified in the Large Load \nInterconnection Study and the updated assigned costs have increased by \nmore than twenty-five percent (25%) compared to costs identified in the \nLarge Load Interconnection Study report, the Large Load Interconnection \nCustomer shall not be subject to a Withdrawal Penalty under LLIP Section \n3.10.1 if the Interconnection Request is withdrawn within thirty (30) \nCalendar Days of receipt of the additional study report.  If the Large Load \nInterconnection Customer elects to continue with its Interconnection \nRequest, the Large Load Interconnection Agreement will be amended to"},{"page":194,"startToken":71979,"endToken":72343,"text":"24 \n \nreflect the results of the additional study. \n \n4.6.4   Financing of Participating TO’s Interconnection Facilities and Large \nLoad Network Upgrades.  The responsibility to finance Participating \nTO’s Interconnection Facilities shall be assigned solely to the Large Load \nInterconnection Customer. The Participating TO will be responsible for \nfinancing Large Load Network Upgrades in accordance with the Large \nLoad Interconnection Agreement and, as to any Large Load Network \nUpgrades that constitute Large Load-Driven Upgrades, the Cost Recovery \nAgreement required under LLIP Section 5.3.   \n \n4.7 \nInterconnection Financial Security   \n \n4.7.1 Types of Interconnection Financial Security.  The Interconnection \nFinancial Security posted by a Large Load Interconnection Customer may \nbe any combination of the following types of Interconnection Financial \nSecurity provided in favor of the Participating TO: \n \n(a) \nan irrevocable and unconditional letter of credit issued by a bank \nor financial institution that has a credit rating of A or better by \nStandard and Poor’s or A2 or better by Moody’s;  \n \n(b) \nan irrevocable and unconditional surety bond issued by an \ninsurance company that has a credit rating of A or better by \nStandard and Poor’s or A2 or better by Moody’s; \n \n(c) \nan unconditional and irrevocable guaranty issued by a company \nthat has a credit rating of A or better by Standard and Poor’s or A2 \nor better by Moody’s; \n \n(d) \na cash deposit standing to the credit of the Participating TO and in \nan interest-bearing escrow account maintained at a bank or \nfinancial institution that is reasonably acceptable to the \nParticipating TO; \n \n(e) \na certificate of deposit in the name of the Participating TO issued \nby a bank or financial institution that has a credit rating of A or \nbetter by Standard and Poor’s or A2 or better by Moody’s; or  \n \n(f) \na payment bond certificate in the name of the Participating TO \nissued by a bank or financial institution that has a credit rating of A \nor better by Standard and Poor’s or A2 or better by Moody’s.  \n \nInterconnection Financial Security instruments as listed above shall be in \nsuch form as the Participating TO may reasonably require from time to \ntime by notice to Large Load Interconnection Customers, or in such other"},{"page":195,"startToken":72343,"endToken":72776,"text":"25 \n \nform as has been evaluated and approved as reasonably acceptable by the \nParticipating TO.     \n \nThe Participating TO shall require the use of standardized forms of \nInterconnection Financial Security to the greatest extent possible.  If at any \ntime the guarantor of the Interconnection Financial Security fails to \nmaintain the credit rating required by this LLIP Section 4.7.1, the Large \nLoad Interconnection Customer shall provide to the Participating TO \nreplacement Interconnection Financial Security meeting the requirements \nof this LLIP Section 4.7.1 within five (5) Business Days of the change in \ncredit rating.  \n \nInterest on a cash deposit standing to the credit of the Participating TO in \nan interest-bearing escrow account under subpart (d) of this LLIP Section \n4.7.1 will accrue to the Large Load Interconnection Customer’s benefit.  \n \nExecution and filing of the Large Load Interconnection Agreement at \nFERC are addressed in LLIP Section 5. \n \nSection 5. \nLarge Load Interconnection Agreement  \n \n5.1 \nTender.  Within thirty (30) Calendar Days after the Report Meeting for the final Large \nLoad Interconnection Study report or, if the Large Load Interconnection \nCustomer has timely requested a FILI Study pursuant to LLIP Section 4.6.2, \nwithin thirty (30) Calendar Days after issuance of the final FILI Study report (or, \nif a Report Meeting is requested for the FILI Study, after such Report Meeting), \nthe Participating TO shall tender to the Large Load Interconnection Customer a \ndraft Large Load Interconnection Agreement developed by the Participating TO \nconsistent with the TO Tariff, this LLIP, and the results of the Interconnection \nStudies.  The draft Large Load Interconnection Agreement shall address, without \nlimitation, the scope, schedule, cost responsibility, payment provisions, cost \nrecovery, and financial security for the Participating TO’s Interconnection \nFacilities and Large Load Network Upgrades, and any applicable operating \nrequirements.  The Large Load Interconnection Customer shall provide written \ncomments, or notification of no comments, on the draft Large Load \nInterconnection Agreement within thirty (30) Calendar Days. \n \n5.2 \nNegotiation.  Notwithstanding LLIP Section 5.1, at the request of Large Load \nInterconnection Customer, Participating TO shall begin negotiations with Large \nLoad Interconnection Customer concerning the terms and conditions of the Large \nLoad Interconnection Agreement at any time after the Participating TO provides \nthe Large Load Interconnection Customer with the final Large Load \nInterconnection Study report, or the final FILI Study report, if applicable.  \nParticipating TO and Large Load Interconnection Customer shall negotiate in \ngood faith concerning any disputed provisions of the draft Large Load \nInterconnection Agreement for not more than sixty (60) Calendar Days after the \nParticipating TO provides the Large Load Interconnection Customer with the final"},{"page":196,"startToken":72776,"endToken":73286,"text":"26 \n \nLarge Load Interconnection Study report or the final FILI Study report if \napplicable.  If Large Load Interconnection Customer determines that negotiations \nare at an impasse, it may request termination of the negotiations at any time after \ntender of the draft Large Load Interconnection Agreement pursuant to LLIP \nSection 5.1 and request submission of the unexecuted Large Load Interconnection \nAgreement with FERC or initiate Dispute Resolution procedures pursuant to LLIP \nSection 7.2.  If Large Load Interconnection Customer requests termination of the \nnegotiations, but within sixty (60) Calendar Days after issuance of the final Large \nLoad Interconnection Study report, or the final FILI Study report if applicable, \nfails to request either the filing of the unexecuted Large Load Interconnection \nAgreement or initiate Dispute Resolution, it shall be deemed to have withdrawn \nits Interconnection Request.  Unless otherwise agreed by the Parties, if Large \nLoad Interconnection Customer has not executed the Large Load Interconnection \nAgreement, requested filing of an unexecuted Large Load Interconnection \nAgreement, or initiated Dispute Resolution procedures pursuant to LLIP Section \n7.2 within the time period set forth in LLIP Section 5.3, it shall be deemed to have \nwithdrawn its Interconnection Request.  Participating TO shall provide to Large \nLoad Interconnection Customer a final Large Load Interconnection Agreement \nwithin fifteen (15) Business Days after the completion of the negotiation process. \n \n \nThe Participating TO may declare an impasse upon sixty (60) Calendar Days after \nissuance of the final Large Load Interconnection Study report, or the final FILI \nStudy report if applicable, or at any time following sixty (60) Calendar Days after \nissuance of the final Large Load Interconnection Study report, or the final FILI \nStudy report if applicable, if the Parties have agreed to extend negotiation of the \nLarge Load Interconnection Agreement.  If the Participating TO declares an \nimpasse, the Participating TO will file the Large Load Interconnection Agreement \nunexecuted with FERC within twenty-one (21) Calendar Days. \n \n5.3 \nExecution and Filing \nWithin thirty (30) Business Days after receipt of the final Large Load \nInterconnection Agreement, Large Load Interconnection Customer shall either: (i) \nexecute the final Large Load Interconnection Agreement and return it to \nParticipating TO; or (ii) request in writing that Participating TO file with FERC \nthe Large Load Interconnection Agreement in unexecuted form, or its \nInterconnection Request shall be deemed withdrawn and subject to LLIP Section \n3.10.  To the extent FERC filing is required, as soon as practicable, but not later \nthan ten (10) Business Days after receiving either the executed Large Load \nInterconnection Agreement or the request to file an unexecuted Large Load \nInterconnection Agreement, Participating TO shall file the Large Load \nInterconnection Agreement with FERC, together with, in the case of an \nunexecuted Large Load Interconnection Agreement, its explanation of any matters \nas to which Large Load Interconnection Customer and Participating TO disagree \nand support for the costs that Participating TO proposes to charge to Large Load \nInterconnection Customer under the Large Load Interconnection Agreement.  An \nunexecuted Large Load Interconnection Agreement should contain terms and \nconditions deemed appropriate by Participating TO for the Interconnection"},{"page":197,"startToken":73286,"endToken":73687,"text":"27 \n \nRequest.  If the Parties agree to proceed with design, procurement, and \nconstruction of facilities and upgrades under the agreed-upon terms of the \nunexecuted Large Load Interconnection Agreement, they may proceed pending \nFERC action.  As a condition to the Participating TO’s design, procurement, \nconstruction, or operation of any Large Load-Driven Upgrades (as defined in the \npro forma Large Load Cost Recovery Agreement set forth in Appendix V to the \nTO Tariff) associated with the Interconnection Request, the Large Load \nInterconnection Customer shall also, within the same period and subject to the \nsame consequences as the Large Load Interconnection Agreement, execute and \nmaintain a Cost Recovery Agreement substantially in the form set forth in \nAppendix V to the TO Tariff, or, if the Large Load Interconnection Customer \nrequests that the Cost Recovery Agreement be filed unexecuted with FERC, \ncomply with that agreement as made effective by FERC.  A Cost Recovery \nAgreement required by this LLIP Section 5.3 is entered into pursuant to the TO \nTariff. \n \n \n5.4 \nCommencement of Interconnection Activities \nIf Large Load Interconnection Customer executes the final Large Load \nInterconnection Agreement, Participating TO and Large Load Interconnection \nCustomer shall perform their respective obligations in accordance with the terms \nof the Large Load Interconnection Agreement, subject to modification by FERC.  \nUpon submission of an unexecuted Large Load Interconnection Agreement, Large \nLoad Interconnection Customer and Participating TO shall promptly comply with \nthe unexecuted Large Load Interconnection Agreement, if agreed to by the Parties \npursuant to LLIP Section 5.3, subject to modification by FERC. \n \nSection 6. \nConstruction of Participating TO's Interconnection Facilities and Large \nLoad Network Upgrades  \n \n \n6.1 \nSchedule \nParticipating TO and Large Load Interconnection Customer shall negotiate in \ngood faith concerning a schedule for the Participating TO’s construction of \nParticipating TO's Interconnection Facilities and the Large Load Network \nUpgrades.  \n \n \n6.2 \nConstruction Sequencing \n \n6.2.1 General.  In general, the Service Commencement Date will determine the \nsequence of construction of Large Load Network Upgrades. \n \n6.2.2 Advancing Construction of Large Load Network Upgrades that are \nPart of an Expansion Plan of the Participating TO.  A Large Load \nInterconnection Customer with a Large Load Interconnection Agreement, \nin order to maintain its Service Commencement Date, may request that \nParticipating TO advance to the extent necessary the completion of Large \nLoad Network Upgrades that:  (i) are necessary to support such Service \nCommencement Date and (ii) would otherwise not be completed, pursuant"},{"page":198,"startToken":73687,"endToken":74085,"text":"28 \n \nto an expansion plan of Participating TO or approved ISO Transmission \nPlan covering the Participating TO’s facilities, in time to support such \nService Commencement Date.  Upon such request, Participating TO will \nuse Reasonable Efforts to advance the construction of such Large Load \nNetwork Upgrades to accommodate such request; provided that Large \nLoad Interconnection Customer commits to pay Participating TO any \nassociated expediting costs.   \n \n6.3 \nSpecial Provisions for Affected Systems   \nThe Large Load Interconnection Customer shall timely enter into and maintain an \nagreement with each applicable Affected System Operator for each addition, \nmodification, or upgrade to an Affected System identified through the \nInterconnection Studies or an applicable Affected System study.  The agreement \nshall specify the terms governing payments to be made by the Large Load \nInterconnection Customer to the Affected System Operator, including financial \nsecurity or credit support sufficient to protect the Affected System Operator and \nits other customers against cost shifting.  Where a Cost Recovery Agreement \napplies, the Large Load Interconnection Customer shall provide the Participating \nTO the evidence of such agreements required by, and within the time specified in, \nthe Cost Recovery Agreement, and the Participating TO may decline to \ncommence, or may suspend, construction as provided in the Cost Recovery \nAgreement.   \n \nSection 7. \nMiscellaneous \n \n7.1 \nConfidentiality \n \nFor the purposes of this LLIP Section 7.1, “Party” or “Parties” shall mean the \nParticipating TO, Large Load Interconnection Customer, ISO, or any combination \nof the Participating TO, Large Load Interconnection Customer, or ISO.  \n \nConfidential Information shall include, without limitation, all information relating \nto a Party's technology, research and development, business affairs, and pricing. \n \nInformation is Confidential Information only if it is clearly designated or marked \nin writing as confidential on the face of the document, or, if the information is \nconveyed orally or by inspection, if the Party providing the information orally \ninforms the Party receiving the information that the information is confidential. \n \nIf requested by either Party, the other Party shall provide in writing, the basis for \nasserting that the information referred to in this LLIP Section 7.1 warrants \nconfidential treatment, and the requesting Party may disclose such writing to the \nappropriate Governmental Authority.  Each Party shall be responsible for the \ncosts associated with affording confidential treatment to its information. \n \n \n \n7.1.1 Scope.  Confidential Information shall not include information that the \nreceiving Party can demonstrate: (1) is generally available to the public"},{"page":199,"startToken":74085,"endToken":74543,"text":"29 \n \nother than as a result of a disclosure by the receiving Party; (2) was in the \nlawful possession of the receiving Party on a non-confidential basis before \nreceiving it from the disclosing Party; (3) was supplied to the receiving \nParty without restriction by a third party, who, to the knowledge of the \nreceiving Party after due inquiry, was under no obligation to the disclosing \nParty to keep such information confidential; (4) was independently \ndeveloped by the receiving Party without reference to Confidential \nInformation of the disclosing Party; (5) is, or becomes, publicly known, \nthrough no wrongful act or omission of the receiving Party or Breach of \nthe Large Load Interconnection Agreement; or (6) is required, in \naccordance with LLIP Section 7.1.6, Order of Disclosure, to be disclosed \nby any Governmental Authority or is otherwise required to be disclosed by \nlaw or subpoena, or is necessary in any legal proceeding establishing \nrights and obligations under the Large Load Interconnection Agreement. \nInformation designated as Confidential Information will no longer be \ndeemed confidential if the Party that designated the information as \nconfidential notifies the other Party that it no longer is confidential. \n \n7.1.2  Release of Confidential Information.  Neither Party shall release or \ndisclose Confidential Information to any other person, except to its \nAffiliates (limited by the Standards of Conduct requirements), employees, \nconsultants, Affected System Operators, the Large Load Customer, or to \nparties who may be providing or considering providing financing to or \nequity participation with Large Load Interconnection Customer or the \nLarge Load Customer, or to potential purchasers or assignees of Large \nLoad Interconnection Customer or the Large Load Customer, on a need-\nto-know basis in connection with these procedures, unless such person has \nfirst been advised of the confidentiality provisions of this LLIP Section 7.1 \nand has agreed to comply with such provisions.  Notwithstanding the \nforegoing, a Party providing Confidential Information to any person shall \nremain primarily responsible for any release of Confidential Information \nin contravention of this LLIP Section 7.1. \n \n7.1.3 Rights.  Each Party retains all rights, title, and interest in the Confidential \nInformation that each Party discloses to the other Party.  The disclosure by \neach Party to the other Party of Confidential Information shall not be \ndeemed a waiver by either Party or any other person or entity of the right \nto protect the Confidential Information from public disclosure. \n \n7.1.4 No Warranties.  By providing Confidential Information, neither Party \nmakes any warranties or representations as to its accuracy or \ncompleteness.  In addition, by supplying Confidential Information, neither \nParty obligates itself to provide any particular information or Confidential \nInformation to the other Party nor to enter into any further agreements or \nproceed with any other relationship or joint venture."},{"page":200,"startToken":74543,"endToken":75053,"text":"30 \n \n7.1.5 Standard of Care.  Each Party shall use at least the same standard of care \nto protect Confidential Information it receives as it uses to protect its own \nConfidential Information from unauthorized disclosure, publication or \ndissemination.  Each Party may use Confidential Information solely to \nfulfill its obligations to the other Party under these procedures or its \nregulatory requirements. \n \n7.1.6 Order of Disclosure.  If a court or a Governmental Authority or entity \nwith the right, power, and apparent authority to do so requests or requires \neither Party, by subpoena, oral deposition, interrogatories, requests for \nproduction of documents, administrative order, or otherwise, to disclose \nConfidential Information, that Party shall provide the other Party with \nprompt notice of such request(s) or requirement(s) so that the other Party \nmay seek an appropriate protective order or waive compliance with the \nterms of these confidentiality provisions. Notwithstanding the absence of a \nprotective order or waiver, the Party may disclose such Confidential \nInformation which, in the opinion of its counsel, the Party is legally \ncompelled to disclose.  Each Party will use Reasonable Efforts to obtain \nreliable assurance that confidential treatment will be accorded any \nConfidential Information so furnished. \n \n7.1.7 Remedies.  The Parties agree that monetary damages would be inadequate \nto compensate a Party for the other Party's Breach of its obligations under \nthis LLIP Section 7.1.  Each Party accordingly agrees that the other Party \nshall be entitled to equitable relief, by way of injunction or otherwise, if \nthe first Party Breaches or threatens to Breach its obligations under this \nLLIP Section 7.1, which equitable relief shall be granted without bond or \nproof of damages, and the receiving Party shall not plead in defense that \nthere would be an adequate remedy at law.  Such remedy shall not be \ndeemed an exclusive remedy for the Breach of this LLIP Section 7.1, but \nshall be in addition to all other remedies available at law or in equity.  The \nParties further acknowledge and agree that the covenants contained herein \nare necessary for the protection of legitimate business interests and are \nreasonable in scope.  No Party, however, shall be liable for indirect, \nincidental, or consequential or punitive damages of any nature or kind \nresulting from or arising in connection with this LLIP Section 7.1. \n \n7.1.8 Disclosure to FERC, its Staff, or a State.  Notwithstanding anything in \nthis LLIP Section 7.1 to the contrary, and pursuant to 18 CFR section \n1b.20, if FERC or its staff, during the course of an investigation or \notherwise, requests information from one of the Parties that is otherwise \nrequired to be maintained in confidence pursuant to the LLIP, the Party \nshall provide the requested information to FERC or its staff, within the \ntime provided for in the request for information.  In providing the \ninformation to FERC or its staff, the Party must, consistent with 18 CFR \nsection 388.112, request that the information be treated as confidential and \nnon-public by FERC and its staff and that the information be withheld"},{"page":201,"startToken":75053,"endToken":75521,"text":"31 \n \nfrom public disclosure.  Parties are prohibited from notifying the other \nParty prior to the release of the Confidential Information to FERC or its \nstaff.  The Party shall notify the other Party to the Large Load \nInterconnection Agreement when it is notified by FERC or its staff that a \nrequest to release Confidential Information has been received by FERC, at \nwhich time either of the Parties may respond before such information \nwould be made public, pursuant to 18 CFR section 388.112.  Requests \nfrom a state regulatory body conducting a confidential investigation shall \nbe treated in a similar manner, consistent with applicable state rules and \nregulations. \n \n7.1.9 Subject to the exception in LLIP Section 7.1.8, any information that a \nParty claims is competitively sensitive, commercial or financial \ninformation (\"Confidential Information\") shall not be disclosed by the \nother Party to any person not employed or retained by the other Party, \nexcept to the extent disclosure is (i) required by law; (ii) reasonably \ndeemed by the disclosing Party to be required to be disclosed in \nconnection with a dispute between or among the Parties, or the defense of \nlitigation or dispute; (iii) otherwise permitted by consent of the other \nParty, such consent not to be unreasonably withheld;  or (iv) necessary to \nfulfill its obligations under this LLIP or as a Participating TO, including \ndisclosing the Confidential Information to the ISO or to a subregional, \nregional or national reliability organization or planning group.  The Party \nasserting confidentiality shall notify the other Party in writing of the \ninformation it claims is confidential.  Prior to any disclosures of the other \nParty's Confidential Information under this subparagraph, or if any third \nparty or Governmental Authority makes any request or demand for any of \nthe information described in this subparagraph, the disclosing Party agrees \nto promptly notify the other Party in writing and agrees to assert \nconfidentiality and cooperate with the other Party in seeking to protect the \nConfidential Information from public disclosure by confidentiality \nagreement, protective order or other reasonable measures. \n \n7.1.10 This provision shall not apply to any information that was or is hereafter in \nthe public domain (except as a result of a Breach of this provision). \n \n7.1.11 Participating TO shall, at Large Load Interconnection Customer's election, \ndestroy, in a confidential manner, or return the Confidential Information \nprovided at the time the Confidential Information is no longer needed. \n \n \n7.2 \nDisputes  \n \n \n \n7.2.1  Submission.  In the event either Party has a dispute, or asserts a claim, that \narises out of or in connection with the Large Load Interconnection \nAgreement, the LLIP, or their performance, such Party (the \"disputing \nParty\") shall provide the other Party with written notice of the dispute or \nclaim (\"Notice of Dispute\").  Such dispute or claim shall be resolved in"},{"page":202,"startToken":75521,"endToken":75558,"text":"32 \n \naccordance with Section 14 of the TO Tariff, including, as applicable, the \nISO ADR Procedures; provided, however, that disputes arising under a \nCost Recovery Agreement shall be resolved under the dispute resolution \nprovisions of that agreement."},{"page":203,"startToken":75558,"endToken":75794,"text":"33 \n \n  \nATTACHMENT 1 \nTO APPENDIX VI – LARGE LOAD INTERCONNECTION PROCEDURES \n \nINTERCONNECTION REQUEST FORM \n \nThis Interconnection Request is submitted to DesertLink, LLC (“Participating TO”) by the \nEligible Customer for Large Load (“ECLL”) identified below, acting as the Large Load \nInterconnection Customer, pursuant to LLIP Section 4.2.1 and Section 10A of the TO Tariff.  \nConsistent with LLIP Section 3.1, the Large Load Interconnection Customer shall send a copy of \nthis Interconnection Request to the ISO.  Capitalized terms not defined herein have the meanings \nset forth in the LLIP or, if not defined in the LLIP, in Section 3 of the TO Tariff. \n \nI. \n Large Load Interconnection Customer (ECLL) Contact Information \nCompany Name \n \nType of ECLL (UDC or MSS) \n \nRepresentative \n \nAddress \n \nEmail \n \nPhone \n \n \nII. \nLarge Load Customer Information \nLarge Load Customer Name \n \nLarge Load Customer Representative and \nContact Information \n \nLarge Load Site Location/Address \n \nType of Large Load Facility (e.g., data \ncenter, industrial) \n \nOther ECLL interconnection requests \nsubmitted for the same Large Load \nCustomer or any of its affiliates (see \nSection 10A.2.1 of the TO Tariff) \n \n \nIII. \nPoint of Interconnection \n \nPlease identify the location and voltage \nlevel of the preferred Point of \nInterconnection in as much detail as \npossible. If proposing to connect to a \ntransmission line, provide the approximate \ndistance from one of the existing line \nterminals.  The Point of Interconnection \nwill serve as the Point of Withdrawal under \nthe TO Tariff."},{"page":204,"startToken":75794,"endToken":75998,"text":"34 \n \n \nIV. \nLarge Load Capacity and Load Ramp Schedule \n \n \nProposed load ramp schedule identifying anticipated load additions over time: \nDate (MM/DD/YYYY) \nIncremental Load (MW) \nCumulative Load (MW) \n \n \n \n \n \n \n \n \n \n \n \n \n \nV. \nProposed Service Commencement Date and Term \n \n \nVI. \nSource of Power \n \n \nVII. \nSite Plan, Site Control, and Permits \n \nPlease attach: (a) a site plan for the Large Load; (b) documentation demonstrating Site Control, \nas defined in Section 3 of the TO Tariff; and (c) documentation demonstrating that the Large \nMaximum Large Load capacity requested \nat the Point of Interconnection (MW) (see \nLLIP Section 3.6) \n \nMaximum capacity the Large Load is \ncapable of withdrawing, if greater than the \namount requested, and the proposed means \nof limiting withdrawals to the requested \namount \n \nExpected power factor and load factor \n \nProposed date for energizing the ECLL \nInterconnection (MM/DD/YYYY) \n \nProposed Service Commencement Date \n(MM/DD/YYYY) (see LLIP Section 3.7) \n \nProposed term of service (years) \n \nPlease identify the electrical location of the \nsource of power to be delivered to the \nLarge Load, if known.  If the source of the \npower is not known, a system purchase \nwill be assumed.  Nothing in this \nInterconnection Request constitutes a \nrequest for transmission service (see LLIP \nSection 3.2.2)."},{"page":205,"startToken":75998,"endToken":76273,"text":"35 \n \nLoad Customer has local permits and regulatory approvals for development of the Large Load, \nconsistent with Section 10A.2.1(f) of the TO Tariff. \n \nVIII. Co-Located Generation \n \nWill the Large Load be co-located with a \ngenerating facility? (Yes/No) \n \nWill the generating facility export to the \nISO Controlled Grid? (Yes/No) \n \nGenerating facility queue number or, if \nexecuted, identification of its generator \ninterconnection agreement \n \nGenerating facility nameplate capacity \n(MW) \n \n \nIX. \nSingle-Line Diagram and Modeling Information \n \nPlease attach a single-line diagram of the Large Load and the Large Load Interconnection \nCustomer’s Interconnection Facilities and/or KMZ files to this Interconnection Request.  Please \nprovide power flow modeling files (PSS/E or PSLF format preferred) or spreadsheet format \ncontaining modeling data such as impedances and ratings of customer-owned equipment. Also \nprovide short-circuit modeling data, dynamic and electromagnetic transient (EMT) models, load \ncharacteristics (including ride-through capability, ramp rates, and harmonic characteristics), any \nother details to be taken into consideration in the Interconnection Studies, and the completed \ntechnical data form in the form of Appendix A to this Attachment 1. \n \nX. \nRequired Submittals (LLIP Section 4.2.1) \nItem \nIncluded (Yes/No) \nInterconnection Study Deposit of $250,000 \n \nCommercial Readiness Deposit equal to \ntwo times the Interconnection Study \nDeposit, in a form permitted by LLIP \nSection 4.7.1 \n \nDemonstration of Site Control \n \nCompleted technical data form in the form \nof Appendix A to this Attachment 1 (TO \nTariff Section 10A.2.1(j)) \n \nCopy of this Interconnection Request sent \nto the ISO \n \n \nXI. \nAcknowledgment \n \nBy submission of this Interconnection Request, the Large Load Interconnection Customer \nacknowledges that additional detail may be required to satisfactorily perform the Interconnection"},{"page":206,"startToken":76273,"endToken":76342,"text":"36 \n \nStudies related to this Interconnection Request and agrees to work with DesertLink, LLC in good \nfaith to provide additional information as necessary.  The Large Load Interconnection Customer \nmay designate information in this Interconnection Request, including the identity of the Large \nLoad Customer, as Confidential Information in accordance with LLIP Section 7.1. \n \nInterconnection Request Submitted By: \n \n \n \n \n \n \n \n \n \nInterconnection Request Received By DesertLink, LLC: \n \n \n \n \n \n \n \n \nPrinted Name: \n \nDate: \n \n \nPrinted Name: \n \nDate:"},{"page":207,"startToken":76342,"endToken":76349,"text":"Attachment 2 \n \nDesertLink TO Tariff Revisions (Marked)"},{"page":208,"startToken":76349,"endToken":76526,"text":"DesertLink, LLC \nTransmission Owner Tariff \n \nTable of Contents \n1. \nPreamble \n1.1 \nTransmission Access for Participating TOs \n1.2 \nTransmission Access for Wheeling Customers \n1.3 \nTransmission Access for End-User \n2. \nEffective Date \n2.1 \nTermination \n3. \nTO Definitions \n3.1 \nAccess Charge \n3.2 \nAGC \n3.3 \nAncillary Services \n3.4 \nApplicable Reliability Criteria \n3.5 \nAvailable Transfer Capacity \n3.6 \nBase Transmission Revenue Requirement \n3.7 \nBlack Start \n3.8 \nBusiness Day \n3.9 \nCompleted Application Date \n3.10 \nCompleted Interconnection Application \n3.11 \nCongestion \n3.12 \nCongestion Management \n3.13 \nConverted Rights \n3.14 \nCPUC \n3.15 \nDemand \n3.16 \nDesertLink \n3.17 \nDirect Assignment Facilities \n3.18 \nDispatch \n3.19 \nDistribution System \n3.20 \nEligible Customer \n3.21 \nEncumbrance \n3.22 \nEnd-Use Customer or End-User \n3.23 \nEnergy \n3.24 \nEntitlement \n3.25 \nExisting Contracts \n3.26 \nExisting Rights \n3.27 \nExpedited Interconnection Agreement \n3.28 \nFacilities Study Agreement \n3.29 \nFacility or Facilities Study \n3.30 \nFERC \n3.31 \nFPA \n3.32 \nGenerating Unit \n3.33 \nGeneration \n3.34 \nGood Utility Practice"},{"page":209,"startToken":76526,"endToken":76744,"text":"3.35 \nGross Load \n3.36 \nHigh Voltage Access Charge \n3.37 \nHigh Voltage Transmission Facility \n3.38 \nHigh Voltage Transmission Revenue Requirement \n3.39 \nHigh Voltage Utility-Specific Rate \n3.40 \nHigh Voltage Wheeling Access Charge \n3.41 \nIndependent System Operator \n3.42 \nISO ADR Procedures \n3.43 \nISO Controlled Grid \n3.44 \nISO Protocols \n3.45 \nISO Tariff \n3.46 \nInterconnection \n3.47 \nInterconnection Agreement \n3.48 \nInterconnection Application \n3.49 \nInterest \n3.50 \nLoad \n3.51 \nLocal Publicly Owned Electric Utility \n3.52 \nLocal Regulatory Authority \n3.53 \nLocal Reliability Criteria \n3.54 \nLow Voltage Access Charge \n3.55 \nLow Voltage Transmission Revenue Requirement \n3.56 \nLow Voltage Wheeling Access Charge \n3.57 \nMarket Participant \n3.58 \nMetered Subsystem (“MSS”) \n3.59 \nNERC \n3.60 \nNew Participating TO \n3.61 \nNon-Load Serving Participating TO \n3.62 \nNon-Participating TO \n3.63 \nNon-Spinning Reserve \n3.64 \nOperational Control \n3.65 \nOriginal Participating TO \n3.66 \nParticipating TO (“PTO”) \n3.67 \nParticipating Agreement \n3.68 \nPhysical Scheduling Plant \n3.69 \nProject \n3.70 \nProject Proponent \n3.71 \nProject Sponsor \n3.72 \nRegional Transmission Group (“RTG”) \n3.73 \nRegulation \n3.74 \nRegulatory Authority \n3.75 \nReliability Criteria \n3.76 \nReliability Upgrade \n3.77 \nRequest for Expedited Interconnection Procedures \n3.78 \nScheduling Coordinator \n3.79 \nScheduling Point \n3.80 \nSpinning Reserve"},{"page":210,"startToken":76744,"endToken":76985,"text":"3.81 \nSystem Impact Study \n3.82 \nSystem Impact Study Agreement \n3.83 \nTO Tariff \n3.84 \n[Not used] \n3.85 \n[Not used] \n3.86 \nTransmission Control Agreement (“TCA”) \n3.87 \nTransmission Owner (“TO”) \n3.88 \nTransmission Revenue Balancing Account Adjustment (“TRBAA”) \n3.89 \nTransmission Revenue Credit \n3.90 \nTransmission Revenue Requirement (“TRR”) \n3.91 \nTransmission System Rights (“TSRs”) \n3.92 \nUncontrollable Force \n3.93 \nUtility Distribution Company (“UDC”) \n3.94 \nVoltage Support \n3.95 \nWestern Electricity Coordinating Council (“WECC”) \n3.96 \nWheeling Access Charge \n3.97 \nWheeling Out \n3.98 \nWheeling Through \n3.99 \nWheeling \n3.100 Wholesale Customer \n4. \nEligibility \n5. \nAccess Charges and Transmission Rates \n5.1 \nLow Voltage Access Charge \n5.2 \nWheeling Access Charge \n5.3 \nTransmission Revenue Requirement \n5.4 \nTransmission System Rights \n5.5 \nTransmission Revenue Balancing Account Adjustment \n6. \nAncillary Services - Applicability and Charges \n7. \nBilling and Payment \n8. \nObligation to Interconnect or Construct Transmission Expansions and Facility \nUpgrades \n8.1 \nParticipating TO Obligation to Interconnect \n8.2 \nParticipating TO Obligation to Construct Transmission Expansion or \nFacility Upgrades \n8.3 \nRequest for FERC Deference Regarding Need Determination \n9. \nExpansion Process \n9.1 \nDetermination of Facilities \n9.2 \nObligation to Build \n9.3 \nProvisions Relating To Transmission Construction On the Systems of \nOther TOs \n10. \nTSWL Interconnection Process \n10.1 \nApplicability \n10.2 \nApplications \n10.3 \nInterconnection Application \n10.4 \nReview of Completed Interconnection Application \n10.5 \nNotice of Need for System Impact Study"},{"page":211,"startToken":76985,"endToken":77199,"text":"10.6 \nImpact Study Cost Reimbursement Agreement \n10.7 \nSystem Impact Study Procedures \n10.8 \nNotice of Need for Facilities Study \n10.9 \nFacilities Study Procedures \n10.10 Partial Interim Service \n10.11 Expedited Interconnection Procedures \n10A. Interconnection Process for ECLL Interconnections  \n \n10A.1 Applicability  \n \n10A.2 ECLL Application and Application Fee  \n \n10A.3 Study Process and ECLL Interconnection Agreement  \n \n10A.4 Interim Service  \n \n10A.5 Co-Located Large Load  \n \n10A.6 Large Load Cost Recovery Agreement \n11. \nUncontrollable Forces and Indemnification \n11.1 \nProcedures to Follow of Uncontrollable Force Occurs \n11.2 \nIndemnification \n12. \nRegulatory Filings \n12.1 \nOpen Access \n13. \nCreditworthiness \n13.1 \nUDCs, MSSs, and Scheduling Coordinators Using the Participating \nTO’s Low Voltage Transmission Facilities \n13.2 \nEnd-Users \n14. \nDisputes \n15. \n[Reserved] \n16. \nMiscellaneous \n16.1 \nNotices \n16.2 \nWaiver \n16.3 \nConfidentiality \n16.4 \nTO Tariff Supersedes Existing Tariffs \n16.5 \nTitles \n16.6 \nSeverability \n16.7 \nPreservation of Obligations \n16.8 \nGoverning Law \n16.9 \nAppendices Incorporated \n16.10 Conflict with ISO Tariff \n16.11 Conflicting Operating Instructions \n16.12 Conflict With Transfer Capability Lease \n \nAppendix I \nTransmission Revenue Requirement and TRBAA \nAppendix II \nNotices \nAppendix III \nFormula Rate \nAppendix IV \nFormula Rate Implementation Protocols \nAppendix V \nPro Forma Large Load Cost Recovery Agreement \nAppendix VI \nLarge Load Interconnection Procedures"},{"page":212,"startToken":77199,"endToken":77627,"text":"3. \nTO Definitions. Certain capitalized terms used in this TO Tariff shall have the meanings \nset out below unless otherwise stated or the context otherwise requires. Capitalized terms \nused in this TO Tariff and not defined below shall have the meanings set out in the ISO \nTariff as it may be amended from time to time. \n \n3.1. \nAccess Charge. A charge paid by all UDCs, MSSs, and, in certain cases, Scheduling \nCoordinators delivering Energy to Gross Load, as set forth in Section 26.1 of the ISO \nTariff. The Access Charge includes the High Voltage Access Charge and the Low \nVoltage Access Charge, as applicable. \n \n3.2. \nAGC. Generation equipment that automatically responds to signals from the ISO’s EMS \ncontrol in real time to control the power output of electric generators within a prescribed \narea in response to a change in system frequency, tie-line loading, or the relation of these \nto each other, so as to maintain the target system frequency and/or the established \ninterchange with other areas within the predetermined limits. \n \n3.3. \nAncillary Services. Regulation, Spinning Reserve, Non-Spinning Reserve, Voltage \nSupport and Black Start together with such other interconnected operation services as the \nISO may develop in cooperation with Market Participants to support the transmission of \nEnergy from generation resources to Loads while maintaining reliable operation of the \nISO Controlled Grid in accordance with Good Utility Practice. \n3.4. \nApplicable Reliability Criteria. The Reliability Standards and reliability criteria \nestablished by NERC and WECC, and Local Reliability Criteria, as amended from time to \ntime, including any requirement of the Nuclear Regulatory Commission. \n3.5. \nAvailable Transfer Capacity. The available capacity of a given transmission path, in \nMW after allocation of rights associated with Existing Contracts and Transmission \nOwnership Rights, to that path’s Operating Transfer Capability established consistent \nwith ISO and WECC transmission capacity rating guidelines, as further described in \nAppendix L to the ISO Tariff. \n3.6. \nBase Transmission Revenue Requirement. The Transmission Revenue Requirement \nwhich does not reflect amounts for the TRBAA. \n \n3.7. \nBlack Start. The procedure by which a Generating Unit self-starts without an external \nsource of electricity, thereby restoring power to the ISO Controlled Grid following \nsystem or local area blackouts. \n \n3.8. \nBusiness Day. Monday through Friday, excluding federal holidays and the day after \nThanksgiving Day. \n \n3.9. \nCo-Located Large Load. A Large Load that is physically connected to the facilities of \nan existing or planned Generating Facility on the Interconnection Customer’s side of the \nPoint of Interconnection to the ISO Controlled Grid (each as defined in the ISO Tariff)."},{"page":213,"startToken":77627,"endToken":78016,"text":"3.93.10. \nCompleted Application Date. The date on which a party submits an Interconnection \nApplication that satisfies the requirements of a Completed TSWL or ECLL \nInterconnection Application. \n3.11. Completed ECLL Interconnection Application. An ECLL Interconnection Application \nthat has been deemed valid under Section 4.3 of Appendix VI. \n3.103.12. Completed TSWL Interconnection Application. AnA TSWL Interconnection \nApplication that satisfies all of the information and other requirements of Section 10.3 of \nthis TO Tariff and, if applicable, the information requirements as specified by the ISO \nand posted on the ISO Home Page. \n3.113.13. Congestion. A characteristic of the transmission system produced by a binding \nConstraint to the optimum economic dispatch to meet Demand such that the LMP, \nexclusive of Marginal Cost of Losses, at different Locations of the transmission system is \nnot equal. \n3.123.14. Congestion Management. The alleviation of Congestion in accordance with \napplicable ISO Protocols and Good Utility Practice. \n3.133.15. Converted Rights. Those transmission service rights determined in accordance with \nSection 4.3.1.6 of the ISO Tariff. \n3.16. Cost Recovery Agreement. An agreement between the Participating TO and an Eligible \nCustomer, including an ECLL, substantially in the form of the pro forma Large Load \nCost Recovery Agreement set forth in Appendix V, entered into pursuant to Section \n10.9 or Section 10A.6 of this TO Tariff. \n3.143.17. CPUC. The California Public Utilities Commission or its successor. \n3.153.18. Demand. The rates at which Energy is delivered to Load and Scheduling Points by \nGeneration, transmission or distribution facilities. It is the product of voltage and the in-\nphase component of alternating current measured in units of watts or standard multiples \ntherefore, e.g. 1000 W = 1 kW, 1000 kW= 1 MW, etc. \n3.163.19. DesertLink, LLC (“DesertLink”). The Delaware limited liability company that is \nthe Participating TO under this TO Tariff. \n3.173.20. Direct Assignment Facilities. Facilities or portions of facilities that are owned by the \nParticipating TO necessary to physically and electrically interconnect a particular party \nrequesting interconnectiona TSWL Interconnection under this TO Tariff to the ISO \nControlled Grid at the point of interconnection. Direct Assignment Facilities shall be \nspecified in the Interconnection Agreement that governs TSWL Interconnection service \nto such party and shall be subject to FERC approval."},{"page":214,"startToken":78016,"endToken":78444,"text":"3.183.21. Dispatch. The operating control of an integrated electric system to: i) assign specific \nGeneration Units and other sources of supply to effect the supply to meet the relevant \narea Demand taken as Load rises or falls; ii) control operations and maintenance of high \nvoltage lines, substations, and equipment, including administration of safety procedures; \niii) operate Interconnections; iv) manage Energy transactions with other interconnected \nControl Areas; and v) curtail Demand. \n \n3.193.22. Distribution System. The distribution assets of a TO, UDC, or MSS. \n \n3.203.23. Eligible Customer. (i) Any utility (including any Participating TO, Market \nParticipant or power marketer), Federal power marketing agency, or any person \ngenerating Energy for sale or resale; Energy sold or produced by such entity may be \nEnergy produced in the United States, Canada or Mexico; however, such entity is not \neligible for transmission service that would be prohibited by FPA Section 212(h)(2); and \n(ii) any retail customer taking unbundled transmission service pursuant to a state retail \naccess program or pursuant to a voluntary offer of unbundled retail transmissions service \nby the Participating TO. \n \n3.24. Eligible Customer for Large Load (“ECLL”). A UDC or MSS that provides retail \ntransmission and interconnection service to Large Load End-Users in the ISO’s \nBalancing Authority Area. \n \n3.25. ECLL Interconnection Agreement. The agreement between an ECLL and the \nParticipating TO governing an ECLL Interconnection. \n \n3.26. ECLL Interconnection. The interconnection of the facilities of an ECLL to the facilities \nof the Participating TO that are for the purpose of an ECLL interconnecting and \nproviding transmission service to a Large Load Customer. \n \n3.27. ECLL Interconnection Application. An application that requests an ECLL \nInterconnection to the ISO Controlled Grid. \n \n3.28. ECLL Interconnection Facilities. The facilities, additions, and upgrades of the \nParticipating TO necessary to accomplish an ECLL Interconnection, as identified in the \napplicable ECLL Interconnection Agreement. \n \n3.213.29. Encumbrance. A legal restriction or covenant binding on the Participating TO that \naffects the operation of any transmission lines or associated facilities and which the ISO \nneeds to take into account in exercising Operational Control over such transmission lines \nor associated facilities if the Participating TO is not to risk incurring significant liability. \nEncumbrances shall include Existing Contracts and may include: (1) other local \nrestrictions or covenants meeting the definition of Encumbrance and arising under other \narrangements entered into before the ISO Operations Date, if any; and (2) legal \nrestrictions or covenants meeting the definition of Encumbrance and arising under a \ncontract or other arrangement entered into after the ISO Operations Date."},{"page":215,"startToken":78444,"endToken":78860,"text":"3.223.30. End-Use Customer or End-User. A purchaser of electric power that purchases such \npower to satisfy a Load directly connected to the ISO Controlled Grid or to a Distribution \nSystem and who does not resell the power. \n3.233.31. Energy. The electrical energy produced, flowing, or supplied by Generation, \ntransmission, or distribution facilities, being the integral with respect to time of the \ninstantaneous power, measured in units of watt-hours or standard multiples thereof. \n3.31.1.1. \nE.g. 1000 Wh = 1 kW, 1000 kWh = 1 MWh, etc. \n \n3.243.32. Entitlement. The right of a Participating TO obtained through contract or other \nmeans to use another entity’s transmission facilities for the transmission of Energy. \n \n3.253.33. Existing Contracts. Those transmission service agreements or other contracts which \ngrant transmission service rights in existence on the ISO Operations Date (including any \ncontracts entered into pursuant to such contracts) as may be amended in accordance with \ntheir terms or by agreement between the parties thereto from time to time. \n \n3.263.34. Existing Rights. Those transmission service rights defined in Section 16.1 of the ISO \nTariff. \n \n3.273.35. Expedited Interconnection Agreement. A contract between a party which has \nsubmitted a Request for Expedited Interconnection Procedures and the Participating TO \nunder which the Participating TO agrees to process, on an expedited basis, the Completed \nInterconnection Application of such party and which sets forth the terms, conditions, and \ncost responsibilities for such Interconnection. \n \n3.283.36. Facilities Study Agreement. An agreement between a Participating TO and either a \nparty requesting Interconnection to the ISO Controlled Grid, Market Participants, Project \nSponsor, ECLL, or identified principal beneficiaries pursuant to which the party \nrequesting such Interconnection, Market Participant, Project Sponsor or identified \nprincipal beneficiaries  agrees to reimburse the Participating TO for the cost of \nperforming or reviewing a Facilities Study. \n \n3.293.37. Facility or Facilities Study. An engineering study conducted to determine required \nmodifications to the Participating TO’s transmission system, including the estimated cost \nand scheduled completion date for such modifications, that will be required to provide \nneeded services. \n \n3.303.38. FERC. The Federal Energy Regulatory Commission, or its successor. \n \n3.39. Firm Interconnection Service. The highest quality (priority) load Interconnection \nservice that provides the on-going safe and reliable operation and maintenance of, and the \nParties’ rights and responsibilities associated with their facilities. \n \n3.40. Flexible Interim Load Interconnection (“FILI”) Service. A transmission \ninterconnection service offered by the Participating TO and accepted by an Eligible"},{"page":216,"startToken":78860,"endToken":79317,"text":"Customer on behalf of a Large Load retail customer to manage operational constraints on \nwithdrawals from the transmission system while the interconnection and system upgrades \nnecessary to provide Firm Interconnection Service are being developed. \n \n3.41. FILI Service Agreement. The agreement developed by the Participating TO pursuant to \nSection 10A.4 that sets forth the terms, conditions, and operating requirements for FILI \nService. \n3.313.42. FPA. The Federal Power Act, 16 U.S.C.§ 791a et seq., as it may be amended from \ntime to time. \n \n3.43. Generating Facility. An Interconnection Customer’s Generating Unit(s) used for the \nproduction and/or storage for later injection of electricity identified in the Interconnection \nRequest, but shall not include the Interconnection Customer’s Interconnection Facilities. \n \n3.323.44. Generating Unit. An individual electric generator and its associated plant and \napparatus whose electrical output is capable of being separately identified and metered or \na Physical Scheduling Plant, that, in either case, is: (a) located within the ISO Control \nArea; (b) connected to the ISO Controlled Grid, either directly or via interconnected \ntransmission or distribution facilities; and (c) that is capable of producing and delivering \nnet Energy (Energy in excess of a generation stations’ internal power requirements). \n \n3.333.45. Generation. Energy delivered from a Generating Unit. \n \n3.46. Generator Interconnection. The interconnection of one or more Generating Units to the \nISO Controlled Grid facilities owned by the Participating TO. \n \n3.343.47. Good Utility Practice. Any of the practices, methods, and acts engaged in or \napproved by a significant portion of the electric utility industry during the relevant time \nperiod, or any of the practices, methods, and acts which, in the exercise of reasonable \njudgment in light of the facts known at the time the decision was made, could have been \nexpected to accomplish the desired result at a reasonable cost consistent with good \nbusiness practices, reliability, safety, and expedition. \n \n3.353.48. Gross Load. For purposes of calculating the transmission Access Charge, Gross \nLoad is all Energy (adjusted for distribution losses) delivered for the supply of End-Use \nCustomer Loads directly connected to the transmission facilities or directly connected to \nthe Distribution System of a Utility Distribution Company or MSS Operator located \n in a PTO Service Territory. Gross Load shall exclude (1) Load with respect to which the \nWheeling Access Charge is payable, (2) Load that is exempt from the Access Charge \npursuant to Section 4.1, Appendix I of the ISO Tariff, and the portion of the load of an \nindividual retail customer of a Utility Distribution Company, Small Utility Distribution \nCompany or MSS Operator that is served by a Generating Unit that: (a) is located on the \ncustomer’s site or provides service to the customer’s site through over-the-fence"},{"page":217,"startToken":79317,"endToken":79764,"text":"arrangements as authorized by Section 218 of the California Public Utilities Code; (b) is a \nqualifying small power production facility or qualifying cogeneration facility, as those \nterms are defined in the FERC’s regulations implementing Section 201 of the Public \nUtility Regulatory Policies Act of 1978; and (c) secures Standby Service from the \nParticipating TO under terms approved by a Local Regulatory Authority or FERC, as \napplicable, or can be curtailed concurrently with an Outage of the Generating Unit \nserving the Load. Gross Load forecasts consistent with filed Transmission Revenue \nRequirements will be provided by each Participating TO to the ISO. \n \n3.363.49. High Voltage Access Charge. A component of the Access Charge determined by the \nISO under Section 26.1 of the ISO Tariff. \n \n3.373.50. High Voltage Transmission Facility. A transmission facility under the Operational \nControl of the ISO that is owned by the Participating TO or to which the Participating TO \nhas an Entitlement that may be associated with a Converted Right, which operates at a \nvoltage at or above 200 kilovolts, and supporting facilities, and the costs of which are not \ndirectly assigned to one or more specific customers. \n3.383.51. High Voltage Transmission Revenue Requirement. The portion of the Participating \nTO’s TRR associated with and allocable to the Participating TO’s High Voltage \nTransmission Facilities and Rights associated with High Voltage Transmission Facilities \n3.393.52. High Voltage Utility-Specific Rate. The Participating TO’s High Voltage \nTransmission Revenue Requirement divided by the Participating TO’s forecast of its \nGross Load. \n \n3.403.53. High Voltage Wheeling Access Charge. The Wheeling Access Charge assessed by \nthe ISO associated with the recovery of the Participating TO’s High Voltage \nTransmission Revenue Requirement in accordance with Section 26.1 of the ISO Tariff. \n \n3.413.54. Independent System Operator (“ISO”). The California Independent System \nOperator Corporation, a state chartered, nonprofit corporation that controls the \ntransmission facilities of all Participating TOs and dispatches certain Generating Units \nand Loads. \n3.423.55. ISO ADR Procedures. The procedures for resolution of disputes or differences set \nout in Section 13 of the ISO Tariff, as amended from time to time. \n3.433.56. ISO Controlled Grid. The system of transmission lines and associated facilities of \nthe Participating TOs that have been placed under the ISO’s Operational Control. \n \n3.443.57. ISO Protocols. The rules, protocols, procedures and standards promulgated by the \nISO (as amended from time to time) to be complied with by the ISO Scheduling \nCoordinators, Participating TOs and all other Market Participants in relation to the \noperation of the ISO Controlled Grid and the participation in the markets for Energy and \nAncillary Services in accordance with the ISO Tariff."},{"page":218,"startToken":79764,"endToken":80259,"text":"3.453.58. ISO Tariff. The California Independent System Operator Agreement and Tariff, \ndated November 1, 2013, as it may be modified from time to time. \n \n3.46 \nInterconnection. Transmission facilities, other than additions or replacements to existing \nfacilities that: (i) connect one system to another system where the facilities emerge from \none and only one substation of the two systems and are functionally separate from the \nISO Controlled Grid facilities such that the facilities are, or can be, operated and planned \nas a single facility; (ii) are identified as retail transmission lines pursuant to contract; or \n(iii) produce Generation at a single point on the ISO Controlled Grid; provided that such \ninterconnection does not include facilities that, if not owned by the Participating TO, \nwould result in a reduction in the ISO’s Operational Control of the Participating TO’s \nportion of the ISO Controlled Grid. \n3.473.59. Interconnection Agreement. A contract between a party requesting a TSWL \nInterconnection and the a Participating TO that owns the transmission facility with which \nthe requesting party wishes to interconnect, as it may be amended from time to time, and, \nfor an ECLL Interconnection, the ECLL Interconnection Agreement. \n \n3.48 \nInterconnection Application. An application that requests Interconnection to the ISO \nControlled Grid. \n3.493.60. Interest. Interest shall be calculated in accordance with the methodology specified for \ninterest on refunds in the regulations of FERC at 18 C.F.R. § 35.19a. Interest on \ndelinquent amounts shall be calculated from the due date of the bill to the date of \npayment. When payments are made by mail, bills shall be considered as having been paid \non the date of receipt. Notwithstanding the foregoing, interest, if any, on amounts payable \nor refundable between the Participating TO and a party to a Cost Recovery Agreement \nshall be governed solely by that Cost Recovery Agreement. \n \n3.61. Interim Firm Interconnection Service. Interconnection service that can be provided, if \nany, on a firm basis prior to the completion of the ECLL Interconnection Facilities and an \nauthorization for the Large Load to withdraw Energy. \n \n3.62. Large Load. An End-User located at a single site behind one or more Point(s) of \nWithdrawal from the ISO Controlled Grid and that has a peak load of 50 MW or greater. \n \n3.503.63. Load. An end-use device of an End-Use Customer that consumes power. Load should \nnot be confused with Demand, which is the measure of power that a Load receives or \nrequires. \n \n3.513.64. Local Publicly Owned Electric Utility. A municipality or municipal corporation \noperating as a public utility furnishing electric service, a municipal district furnishing \nelectric services, or a joint powers authority that includes one or more of these agencies \nand that owns Generation or transmission facilities, or furnishes electric services over its \nown or its members’ electric Distribution System. \n \n3.523.65. Local Regulatory Authority. The state or local governmental authority responsible \nfor the regulation or oversight of a utility."},{"page":219,"startToken":80259,"endToken":80690,"text":"3.533.66. Local Reliability Criteria. Reliability criteria established by the ISO, unique to the \ntransmission systems of each of the Participating TOs, as they may be updated from time \nto time. \n \n3.543.67. Low Voltage Access Charge. The Access Charge applicable under Section 26.1 of \nthe ISO Tariff to recover the Low Voltage Transmission Revenue Requirement of the \nParticipating TO. \n \n3.553.68. Low Voltage Transmission Revenue Requirement. The portion of the Participating \nTO’s TRR associated with and allocable to the Participating TO’s Low Voltage \nTransmission Facilities and Converted Rights associated with Low Voltage Transmission \nFacilities. \n \n3.563.69. Low Voltage Wheeling Access Charge. The Wheeling Access Charge associated \nwith the recovery of the Participating TO’s Low Voltage Transmission Revenue \nRequirement in accordance with Section 26.1 of the 1SO Tariff. \n \n3.573.70. Market Participant. An entity, including a Scheduling Coordinator, who participates \nin the Energy marketplace through the buying, selling, transmission, or distribution of \nEnergy or Ancillary Services into, out of, or through the ISO Controlled Grid. \n \n3.583.71. Metered Subsystem (“MSS”). A geographically contiguous system, located within a \nsingle zone which has been operating as an electric utility for a number of years prior to \nthe ISO Operations Date as a municipal utility, water district, irrigation district, state \nagency or federal power marketing authority subsumed within the ISO Balancing \nAuthority Area and encompassed by ISO certified revenue quality meters at each \ninterface point with the ISO Controlled Grid and ISO-certified revenue quality meters on \nall Generating Units or, if aggregated, each individual resource and Participating Load, \nReliability Demand Response Resource, and Proxy Demand Resource internal to the \nsystem, which is operated in accordance with a MSS agreement described in Section 4.9.1 \nof the ISO Tariff. \n \n3.593.72. NERC. The North American Electric Reliability Corporation or its successor. \n \n3.603.73. New Participating TO. A Participating TO that is not an Original Participating TO. \n \n3.613.74. Non-Load-Serving Participating TO. A Participating TO that does not serve Load. \n \n3.623.75. Non-Participating TO. A TO that is not a party to the TCA or, for the purpose of \nSection 16.1 of the ISO Tariff, the holder of transmission service rights under an Existing \nContract that is not a Participating TO. \n3.633.76. Non-Spinning Reserve. The portion of off-line generating capacity that is capable of \nbeing synchronized and ramping to a specified load in ten minutes (or load that is capable \nof being interrupted in ten minutes) and that is capable of running (or being interrupted) \nfor at least two hours."},{"page":220,"startToken":80690,"endToken":81194,"text":"3.643.77. Operational Control. The rights of the ISO under the Transmission Control \nAgreement and the ISO Tariff to direct Participating TOs how to operate their \ntransmission lines and facilities and other electric plant affecting the reliability of those \nlines and facilities for the purpose of affording comparable nondiscriminatory \ntransmission access and meeting Applicable Reliability Criteria. \n \n3.653.78. Original Participating TO. A Participating TO that was a Participating TO as of \nJanuary 1, 2000. The Original Participating TOs are Pacific Gas and Electric Company, \nSouthern California Edison Company, and San Diego Gas & Electric Company. \n3.663.79. Participating TO (“PTO”). A party to the TCA whose application under Section 2.2 \nof the TCA has been accepted and who has placed, or expects to place, its transmission \nassets and/or Entitlements under the ISO’s Operational Control in accordance with the \nTCA. A PTO may be an Original Participating TO or a New Participating TO. For the \npurposes of this Tariff, the Participating TO is DesertLink. \n \n3.673.80. Participation Agreement. An agreement between a Participating TO and a Project \nSponsor that specifies the terms and conditions under which the Participating TO will \nconstruct a transmission addition or upgrade on behalf of the Project Sponsor. \n3.683.81. Physical Scheduling Plant. A group of two or more related Generating Units each of \nwhich is individually capable of producing Energy, but which either by physical \nnecessity or operational design must be operated as if they were a single Generating Unit \nand any Generating Unit or Units containing related multiple generating components \nwhich meet one or more of the following criteria: (i) multiple generating components are \nrelated by a common flow of fuel which cannot be interrupted without substantial loss of \nefficiency of the combined output of all components; (ii) the Energy production from one \ncomponent necessarily causes Energy production from other components; (iii) the \noperational arrangement of related multiple generating components determines the \noverall physical efficiency of the combined output of all components; (iv) the level of \ncoordination required to schedule individual generating components would cause the ISO \nto incur scheduling costs far in excess of the benefits of having scheduled such individual \ncomponents separately; or (v) metered output is available only for the combined output of \nrelated multiple generation components and separate generating component metering is \neither impractical or economically inefficient. \n \n3.82. Point of Withdrawal. Point(s) within the ISO Balancing Authority Area, or for purposes \nof scheduling and operating the Day Ahead Market only, the EDAM Area where Energy \nand Ancillary Services are made available to a receiving party under the ISO Tariff, for \npurposes of scheduling and operating the Real-Time Market only, the EIM Area where \nEnergy and Ancillary Services are made available to a receiving party under the ISO \nTariff, or for purposes of the definition of Large Load only, the point(s) where a non-\ntransmission facility that is used to withdraw Energy from the ISO Controlled Grid to \nserve an End-User connects to the ISO Controlled Grid."},{"page":221,"startToken":81194,"endToken":81650,"text":"3.693.83. Project. DesertLink’s interest in the single-circuit 500 kV (AC) overhead \ntransmission line connecting the existing Harry Allen Substation in Nevada to the \nexisting Eldorado Substation in Nevada, including series compensation. For the \navoidance of doubt, the Project does not include any required work within the fence line \nof each substation. \n \n3.703.84. Project Proponent. A Market Participant or group of Market Participants that (i) \nadvocates a transmission addition or upgrade; (ii) is unwilling to pay the full cost of the \nproposed transmission addition or upgrade, and thus is not a Project Sponsor; and (iii) \ninitiates proceedings under the ISO ADR Procedures to determine the need for the \nproposed transmission addition or upgrade. \n \n3.713.85. Project Sponsor. A Market Participant or group of Market Participants or a \nParticipating TO that proposes the construction of a transmission addition or upgrade in \naccordance with Section 24 of the ISO Tariff. \n \n3.723.86. Regional Transmission Group (“RTG”). A voluntary organization approved by \nFERC and composed of transmission owners, transmission users, and other entities, \norganized to efficiently coordinate the planning, expansion, and use of transmission on a \nregional and inter-regional basis. \n3.733.87. Regulation. The service provided either by Generating Units certified by the ISO as \nequipped and capable of responding to the ISO’s direct digital control (AGC) signals, or \nby System Resources that have been certified by the ISO as capable of delivering such \nservice to the ISO Balancing Authority Area, in an upward and downward direction to \nmatch, on a Real Time basis, Demand and resources, consistent with established NERC \nand WECC reliability standards, including any requirements of the Nuclear Regulatory \nCommission. Regulation is used to control the Power output of electric generators within \na prescribed area in response to a change in system frequency, tie-line loading, or the \nrelation of these to each other so as to maintain the target system frequency and/or the \nestablished interchange with other Balancing Authority Areas within the predetermined \nRegulation Limits. Regulation includes both the increase of output by a Generating unit \nor System Resource (Regulation Up) and the decrease in output by a Generating unit or \nSystem Resource (Regulation Down). Regulation Up and Regulation Down are distinct \ncapacity products, with separately stated requirements and ASMPs in each Settlement \nPeriod. \n \n3.743.88. Regulatory Authority. The Federal Energy Regulatory Commission. \n \n3.753.89. Reliability Criteria. Pre-established criteria that are to be followed in order \nto maintain desired performance of the ISO Controlled Grid under contingency or steady \nstate conditions. \n \n3.763.90. Reliability Upgrade. The transmission facilities, other than Direct Assignment \nFacilities, beyond the first point of Interconnection necessary to interconnect a New \nFacility or wholesale Loadaccomplish a TSWL Interconnection safely and reliably to the"},{"page":222,"startToken":81650,"endToken":82058,"text":"ISO Controlled Grid, which would not have been necessary but for the TSWL \nInterconnection of a New Facility or wholesale Load, including network upgrades \nnecessary to remedy short circuit or stability problems resulting from the TSWL \nInterconnection of the new Facility or wholesale Load to the ISO Controlled Grid. \nReliability Upgrades also include, consistent with WECC practice, the facilities necessary \nto mitigate any adverse impact a New Facility’s or wholesale Load’sTSWL \nInterconnection may have on a path’s WECC path rating. Reliability Upgrades shall be \nspecified in the Interconnection Agreement that governs a TSWL Interconnection service \nand shall be subject to FERC approval. \n \n3.773.91. Requests for Expedited Interconnection Procedures. A written request by which an \napplicant for Interconnection can request expedited processing of its TSWL \nInterconnection Application. \n \n3.783.92. Scheduling Coordinator. An entity certified by the ISO for the purpose of \nundertaking the functions specified in Section 4.5 of the ISO Tariff. \n \n3.793.93. Scheduling Point. A location at which the ISO Controlled Grid or a transmission \nfacility owned by a Transmission Ownership Right holder is connected, by a group of \ntransmission paths for which a physical, non-simultaneous transmission capacity rating \nhas been established for Congestion Management, to transmission facilities that are \noutside the ISO’s Operational Control. \n \n3.94. Site Control. An ECLL may demonstrate that its Large Load Customer has Site Control \nby:  \nan option for a lease or an executed lease for real property of sufficient size to house the Large \nLoad; or  \nan option to purchase or title to real property of sufficient size to house the Large Load. \n \n3.803.95. Spinning Reserve. The portion of unloaded synchronized generating capacity that is \nimmediately responsive to system frequency and that is capable of being loaded in ten \nminutes, and that is capable of running for at least two hours. \n3.813.96. System Impact Study. An engineering study conducted to determine whether a \nrequest for Interconnection to the ISO Controlled Grid would require new transmission \nadditions, upgrades, or other mitigation measures. \n \n3.823.97. System Impact Study Agreement. An agreement between a Participating TO and an \nentity that has requested Interconnection to the Participating TO’s transmission system \npursuant to which the entity requesting Interconnection agrees to reimburse the \nParticipating TO for the cost of performing or reviewing a System Impact Study. \n \n3.833.98. TO Tariff. This Transmission Owner Tariff, as it may be amended or superseded. \n \n3.843.99. [Reserved]."},{"page":223,"startToken":82058,"endToken":82492,"text":"3.853.100. [Reserved]. \n3.863.101. Transmission Control Agreement (“TCA”). The agreement between the ISO and \nParticipating TOs establishing the terms and conditions under which TOs will become \nParticipating TOs and how the ISO and each Participating TO will discharge its \nrespective duties and responsibilities, as may be modified from time to time. \n \n3.873.102. Transmission Owner (“TO”). An entity owning transmission facilities or having \nfirm contractual rights to use transmission facilities. \n \n3.883.103. Transmission Revenue Balancing Account Adjustment (“TRBAA”). A \nmechanism established by the Participating TO which will ensure that all Transmission \nRevenue Credits and other credits specified in Section 6 and 8 of Appendix F, Schedule 3 \nof the ISO Tariff, and all amounts that a Cost Recovery Agreement requires to be \ncredited through the TRBAA, flow through to ISO Tariff and TO Tariff transmission \ncustomers. \n \n3.893.104. Transmission Revenue Credit. The proceeds received from the ISO (other than for \nthe recovery of the Participating TO’s High Voltage and Low Voltage Transmission \nRevenue Requirement through the High Voltage and Low Voltage Transmission Access \nCharges) and charges imposed by the ISO that are received and paid by the Participating \nTO in its role as Participating TO, as defined in the ISO Tariff. \n3.903.105. Transmission Revenue Requirement (“TRR’). The total annual authorized revenue \nrequirement associated with transmission facilities and Entitlements turned over to the \nOperational Control of the ISO by the Participating TO. The costs of any transmission \nfacility turned over to the Operational Control of the ISO shall be fully included in the \nParticipating TO’s TRR. The TRR includes the costs of transmission facilities and \nEntitlements and deducts Transmission Revenue Credits and is shown in Appendix I. \n \n3.913.106. Transmission System Rights (“TSRs”). TSRs represent DesertLink’s exclusive \ntransmission entitlement on its share of the Project. DesertLink, as the holder of the \nTSRs, is entitled to all associated rights as are available under the ISO Tariff and \nProtocols. The use of this definition does not limit DesertLink from seeking any \nadditional revenues or rights that are authorized by FERC due to a beneficial increase in \nthe ISO controlled grid capacity resulting from the Project. \n \n3.107. Transmission System Wholesale Load (“TSWL”) Interconnection. The \ninterconnection of the transmission facilities of the Participating TO to the transmission \nfacilities of a Transmission Owner, electric utility, or other entity eligible to request \ninterconnection. A TSWL Interconnection does not include a Generator Interconnection \nor an ECLL Interconnection. \n \n3.108. TSWL Interconnection Application. An application that requests a TSWL \nInterconnection to the ISO Controlled Grid, including any modifications to existing \npoints of interconnection."},{"page":224,"startToken":82492,"endToken":82891,"text":"3.923.109. Uncontrollable Force. Any act of God, labor disturbance, act of the public enemy, \nwar, insurrection, riot, fire, storm, flood, earthquake, explosion, any curtailment, order, \nregulation or restriction imposed by governmental, military or lawfully established \ncivilian authorities or any other cause beyond the reasonable control of the ISO or Market \nParticipant, as the case may be, which could not be avoided through the exercise of Good \nUtility Practice. \n \n3.933.110. Utility Distribution Company (“UDC”). An entity that owns a Distribution System \nfor the delivery of Energy to and from the ISO Controlled Grid, and/or that provides \nregulated retail electric service to End-Users. \n3.943.111. Voltage Support. Services provided by Generating Units or other equipment such- as \nshunt capacitors, static vat compensators, or synchronous condensers that are required to \nmaintain established grid voltage criteria. This service is required under normal or system \nemergency conditions. \n \n3.953.112. Western Electricity Coordinating Council (“WECC”). The Western Electricity \nCoordinating Counsel or its successor. \n \n3.963.113. Wheeling Access Charge. The charge assessed by the ISO that is paid by a \nScheduling Coordinator for Wheeling in accordance with Section 26.1.4.1 of the ISO \nTariff. Wheeling Access Charges shall not apply for Wheeling under a bundled non-\neconomy Energy coordination agreement of a Participating TO executed prior to July 9, \n1996. The Wheeling Access Charge consists of a High Voltage Wheeling Access Charge \nand, if applicable, a Low Voltage Wheeling Access Charge. \n \n3.973.114. Wheeling Out. Except for Existing Rights exercised under an Existing Contract in \naccordance with Section 16.1 of the ISO Tariff, the use of the ISO Controlled Grid for the \ntransmission of Energy from a Generating Unit located within the ISO Controlled Grid to \nserve a Load located outside the transmission and Distribution System of a Participating \nTO. \n3.983.115. Wheeling Through. Except for Existing Rights exercised under an Existing Contract \nin accordance with Section 16.1 of the ISO Tariff, the use of the ISO Controlled Grid for \nthe transmission of Energy from a resource located outside the ISO Controlled Grid to \nserve a Load located outside the transmission and Distribution System of a Participating \nTO. \n3.993.116. Wheeling. Wheeling Out or Wheeling Through. \n \n3.1003.117. \nWholesale Customer. A person wishing to purchase Energy and Ancillary \nServices at a Bulk Supply Point or a Scheduling Point for resale."},{"page":225,"startToken":82891,"endToken":82968,"text":"4. \nEligibility for Service. Transmission service over a Participating TO’s system shall be \nprovided only to Eligible Customers as defined byfor transmission service under the ISO \nTariff. Any dispute as to whether a customeran entity that resells power is eligible for \nservicean interconnection under this TO Tariff shall be resolved by the FERC. Any \ndispute as to whether an End-User is eligible for an interconnection under this TO Tariff \nwill be resolved by the Local Regulatory Authority."},{"page":226,"startToken":82968,"endToken":83425,"text":"5. \nAccess Charges and Transmission Rates. The applicable Access Charges are \nprovided in the ISO Tariff. \n \n5.1 \nLow Voltage Access Charge. The Low Voltage Access Charge shall be determined in \naccordance with the ISO Tariff. As DesertLink is a Non-Load- Serving Participant TO, \nthe ISO shall charge for and collect the Low Voltage Access Charge on DesertLink’s \nbehalf pursuant to Section 26.1 and Appendix F, Schedule 3, Section 13 of the ISO \nTariff from the Participating TO to whose facilities DesertLink’s Low Voltage \nTransmission Facilities are directly connected. The rate for DesertLink’s Low Voltage \nAccess Charge Shall be DesertLink’s Low Voltage Transmission Revenue Requirement \ndivided by the forecasted Gross Load of the Participating TO that is the Low Voltage \nAccess Charge customer. The Low Voltage Access Charge customer shall pay the ISO a \nLow Voltage Access Charge equal to the product of DesertLink’s Low Voltage Access \nCharge rate and the actual Gross Load of the Participating TO that is the Low Voltage Access \nCharge Customer. \n \n5.2 \nWheeling Access Charge. The Wheeling Access Charge shall be determined in \naccordance with the ISO Tariff. The Wheeling Access Charge assessed by the ISO \nconsists of a High Voltage Wheeling Access Charge and, if applicable, a Low Voltage \nWheeling Access Charge. The High Voltage Wheeling Access Charge is set forth in the \nISO Tariff. \n \n5.3 \nTransmission Revenue Requirement. As set forth in the ISO Tariff, the Transmission \nRevenue Requirement for each Participating TO is used to develop the Access Charges \nset forth in the ISO Tariff and is used by the ISO to calculate the disbursement of \nWheeling revenues among Participating TOs. Wheeling revenues are disbursed by the \nISO to Participating TOs pursuant to Section 26.1.4.3 of the ISO Tariff. DesertLink’s \nTRR is set forth in Appendix I. \n \n5.4 \nTransmission System Rights. DesertLink owns the TSRs with respect to the Project \nconsistent with its ownership percentage of the Project and owns the TSRs with respect \nto any subsequent project it develops. \n \n5.5 \nTransmission Revenue Balancing Account Adjustment (“TRBAA”). The \nParticipating TO shall maintain a Transmission Revenue Balancing Account with an \nannual TRBAA that will ensure that all Transmission Revenue Credits and adjustments \nfor any over-or under-recovery of its annual Transmission Revenue Requirement, if \nany, specified in Sections 6, 8 and 13 of Appendix F, Schedule 3 of the ISO Tariff, \nflow through to transmission customers. The TRBAA used to calculate the High \nVoltage Revenue Requirement shall include other adjustments specified in Appendix F, \nSchedule 3, Sections 6, 8 and 13 of the ISO Tariff. The TRBAA shall also ensure that \nall amounts that a Cost Recovery Agreement requires to be credited to transmission \ncustomers through the TRBAA flow through to transmission customers."},{"page":227,"startToken":83425,"endToken":83716,"text":"The TRBAA shall be equal to: \nTRBAA = Cr + Cf + I \nWhere: \n \nCr = \nThe principal balance in the Transmission Revenue Balancing Account \n(“TRBA”) recorded in FERC Account No. 254 as of September 30 of the \nyear prior to commencement of the January billing cycle. This balance \nrepresents the unamortized balance in the TRBA from the previous \nperiod and the difference in the amount of revenues or expenditures from \nTransmission Revenue Credits, amounts recorded in the TRBA under \nany Cost Recovery Agreement, and any over- or under-recovery of its \nannual Transmission Revenue Requirement and the amount of such \nrevenues or expenditures that has been refunded to or collected from \ncustomers through operation of the TRBAA; \n \nCf = \nThe forecast of Transmission Revenue Credits, if any, for the \nfollowing calendar year, plus any forecast credit that a Cost \nRecovery Agreement requires to be included in the TRBAA \nfor the following calendar year;  \n \nI = \nThe interest balance for the TRBA, which shall be calculated \nusing the interest rate pursuant to Section 35.19(a)35.19a of \nFERC’s regulations under the Federal Power Act (18 CFR \nSection 35.19(a)35.19a). Interest shall be calculated based on \nthe average TRBA principal balance each month, \ncompounded quarterly; and. Amounts recorded in the TRBA \nunder any Cost Recovery Agreement shall be included in the \nTRBA principal balance for purposes of this calculation. \nNothing in this Section 5.5 requires the payment of interest \nbetween the Participating TO and a party to a Cost Recovery \nAgreement on amounts payable or refundable under that \nagreement, which shall be governed solely by the terms of \nthe Cost Recovery Agreement; and \n \nThe DesertLink TRBAA, calculated in accordance with the ISO Tariff and \napproved by the FERC, is stated in Appendix I."},{"page":228,"startToken":83716,"endToken":84136,"text":"8. \nObligation to Interconnect or Construct Transmission Expansions and \nFacility Upgrades. Unless DesertLink is the lead Participating TO with \nrespect to an Interconnection, the provisions of Section 8 of this TO Tariff, \nand its subparts, shall have no application to the Project or any other High \nVoltage Transmission Facilities, Low Voltage Transmission Facilities, or \nEntitlements turned over to the ISO’s operational control by DesertLink, and \nthe corresponding provisions of the lead Participating TO’s TO Tariff shall \ngovern. \n \n8.1 \nParticipating TO Obligation to Interconnect. The Participating TO shall, at \nthe request of a third party, interconnect its system to the wholesale generation \nor Load of such third party, or modify an existing wholesale Interconnection. \nInterconnections under this TO Tariff shall be available to entities eligible to \nrequest Interconnection consistent with the provisions of Section 210(a) of the \nFPA. The procedures for the Interconnections of Load to the ISO Controlled \nGrid shall be governed by this TO Tariff and the ISO Tariff. The procedures \nfor Interconnection of wholesale generation to the ISO Controlled Grid shall \nbe governed by the ISO Tariff. \n \n8.1.1 Interconnection to Transmission System. InterconnectionAny \ninterconnection must be consistent with Good Utility Practice, in \nconformance with all Applicable Reliability Criteria, all applicable \nstatutes, regulations, and ISO reliability criteria for the ISO Controlled \nGrid. The Participating TO will not accommodate the interconnection \nInterconnection if doing so would impair systems reliability, or would \notherwise impair the ability of the Participating TO to honor its \nEncumbrances existing as of the time an entity submits its \nInterconnection Applicationinterconnection application. The \nParticipating TO shall identify any such adverse effect on its \nEncumbrances in the System Impact Study performed pursuant to \nSection 10.7interconnection studies. To the extent the Participating TO \ndetermines that the Interconnectioninterconnection will have an \nadverse effect on Encumbrances, the party requesting \nInterconnectioninterconnection shall mitigate such adverse effect. \n \n8.1.1.1 Letter Agreement for Generator Interconnections. Pursuant to \nSection 12 of Appendix DD or KK of the ISO Tariff, prior to executing \na Generator Interconnection Agreement, a party seeking a Generator \nInterconnection may, in order to advance the implementation of its \nInterconnection, request, and the Participating TO shall offer the party, \na Letter Agreement that authorizes the Participating TO to begin \nengineering, design, and procurement of long lead-time items, or \nconstruction necessary for the establishment of the Generator \nInterconnection. However, the Participating TO shall not be obligated \nto offer a Letter Agreement if the party seeking Generator \nInterconnection is in Dispute Resolution as a result of an allegation"},{"page":229,"startToken":84136,"endToken":84572,"text":"that the party seeking Interconnection has failed to meet any \nmilestones or comply with any prerequisites specified in the ISO \nTariff. The Letter Agreement is an optional procedure. The Letter \nAgreement shall provide for the party seeking Generator \nInterconnection to pay the cost of all activities authorized by the party \nand to make advance payments or provide other satisfactory security \nfor such costs. \n \n \nFollowing a party seeking Interconnection’s request for a Letter \nAgreement, the Participating TO shall prepare and tender to the party \nseeking Interconnection a draft Letter Agreement, including draft \nexhibits that include the proposed scope of work, estimated costs, \npayments, financial security and milestones, as applicable. The party \nseeking Generator Interconnection shall provide written comments, or \nnotification of no comments, to the draft exhibits within thirty (30) \nCalendar Days. The Participating TO and the party seeking \nInterconnection shall negotiate concerning any disputed provisions of \nthe exhibits to the draft Letter Agreement for not more than ninety (90) \nCalendar Days after the Participating TO tenders the draft Letter \nAgreement to the party seeking Generator Interconnection. If the party \nseeking Interconnection determines that negotiations are at an impasse, \nit may request termination of the negotiations at any time after tender \nof the draft Letter Agreement and request submission of the \nunexecuted Letter Agreement with FERC or initiate dispute resolution \nprocedures pursuant to Section 14 of this TO Tariff. If the party \nseeking Generator Interconnection requests termination of the \nnegotiations, but within ninety (90) Calendar Days after the \nParticipating TO tenders the draft Letter Agreement to the party \nseeking Interconnection, fails to request either the filing of the \nunexecuted Letter Agreement or initiate dispute resolution procedures, \nit shall be deemed to have withdrawn its request for a Letter \nAgreement and the Participating TO shall have no further obligation to \nenter into a Letter Agreement, unless an extension is mutually agreed \nto by the parties. The Participating TO shall provide to the party \nseeking Interconnection a final Letter Agreement within fifteen (15) \nBusiness Days after the completion of the negotiation process. \n \n \nFollowing submission of the final Letter Agreement to the party \nseeking Generator Interconnection, the party shall either: (i) execute \ntwo originals of the tendered Letter Agreement and return them to the \nParticipating TO; or (ii) request in writing that the Participating TO file \nwith FERC a Letter Agreement in unexecuted form. As soon as \npracticable, but not later than ten (10) Business Days after receiving \neither the two executed originals of the tendered Letter Agreement or \nthe request to file an unexecuted Letter Agreement, the Participating \nTO shall file the Letter Agreement with FERC, together with its"},{"page":230,"startToken":84572,"endToken":84973,"text":"explanation of any matters as to which the party seeking \nInterconnection and the Participating TO disagree and support for the \ncosts that the Participating TO proposes to charge to the party seeking \nGenerator Interconnection under the Letter Agreement. An unexecuted \nLetter Agreement should contain terms and conditions deemed \nappropriate by the Participating TO for the Generator Interconnection \nrequest. \n \n \nIf the party seeking Interconnection executes the final Letter \nAgreement, the Participating TO and the party seeking Generator \nInterconnection shall perform their respective obligations in \naccordance with the terms of the Letter Agreement, subject to \nmodification by FERC. Upon submission of an unexecuted Letter \nAgreement, the party seeking Generator Interconnection and the \nParticipating TO shall promptly comply with the unexecuted Letter \nAgreement, subject to modification by FERC. \n \n8.1.2 Costs Associated with Interconnection. Each party requesting \nInterconnection shall pay the costs of planning, installing, owning, \noperating, and maintaining any Direct Assignment Facilities and, if \napplicable, any Reliability Upgrades required to provide the requested \nInterconnection. In addition, such party shall implement all existing \noperating procedures necessary to safely and reliability interconnect \nsuch party’s generation or wholesale load to the facilities of the \nParticipating TO and to ensure the ISO Controlled Grid’s conformance \nwith the ISO Grid Planning Criteria, and shall bear all costs of \nimplementing such operating procedures. Any additional costs \nassociated with accommodating the Interconnection shall be allocated \nin accordance with the cost responsibility methodology set forth in the \nISO Tariff for transmission expansions or upgrades. \n \n8.1.3 Interconnection Agreement. Interconnection Agreements shall be \ntendered, executed, and filed as provided in Sections 10.9 and 10A.3. \n8.1.3 Interconnection Agreement. Pursuant to Section 10.4, 10.7.1, or 10.9.1, \na party requesting an Interconnection shall request in writing that the \nParticipating TO tender to such part an Interconnection Agreement that \nwill be filed with FERC, or the Local Regulatory Authority, in the case of \na Local Publicly Owned Electric Utility. The Interconnection Agreement \nwill include, without limitation, cost responsibilities and payment \nprovisions for any engineering, equipment, and construction, ownership, \noperation and maintenance costs for any Direct Assignment Facilities, any \nReliability Upgrades, any Delivery Upgrades, if applicable, and for any \nother mitigation measures. For an Interconnection request to remain a \nCompleted Interconnection Application, the party requesting the \nInterconnection shall execute the Interconnection Agreement and return it \nto the Participating TO within thirty (30) Business Days of receipt."},{"page":231,"startToken":84973,"endToken":85450,"text":"Alternatively, if an Eligible Customer requesting the Interconnection \nrequests the Participating TO to file an unexecuted Interconnection \nAgreement and commits to abide by the terms, conditions, and cost \nassignments determined to be just and reasonable under the ISO ADR \nProcedures, including any determination by FERC or on appeal of a \nFERC determination in accordance with that process, the Participating TO \nshall promptly file an unexecuted Interconnection Agreement. Provided, \nhowever, that if the ISO ADR Procedures concerns whether the \nrequesting entity is an Eligible Customer, the Participating TO shall not \nbe obligated to file an unexecuted interconnection Agreement or \ncommence construction of the Interconnection facilities or incur other \ncosts under the Interconnection Agreement until a final order determining \nthe just and reasonable rates, terms, and conditions for such \nInterconnection Agreement has been issued by the applicable court or \nregulatory authority. The Interconnection Agreement will set forth a payment \nschedule that enables the Participating TO to recover its costs. If the applicant \nelects not to execute the Interconnection Agreement and does not request the \nParticipating TO to file an unexecuted Interconnection Agreement, its \nCompleted Interconnection Agreement shall be deemed withdrawn, and the \napplicant shall reimburse to the Participating TO all costs reasonably incurred in \nprocessing the application not covered by any System Impact Study Agreement \nor Facilities Study Agreement. To maintain its queue position, the applicant \nmust timely comply with the Interconnection requirements of Section 5.76 of the \nISO Tariff and Sections 8.1 and 10 of this TO Tariff. If the applicant fails to \ntimely comply with such Interconnection requirements, such applicant shall pay \nthe reasonable costs of revising the System Impact Studies for other applicants \nthat have established a new queue position due to the applicant either \nwithdrawing its Interconnection Application or because its queue position has \nbeen modified pursuant to the queuing provisions in Section 25 of the ISO \nTariff. \n \n8.1.4 Due Diligence to Construct. The Participating TO shall use due \ndiligence to construct, within a reasonable time, any Direct Assignment \nFacilities and any Reliability Upgrades that it is obligated to construct \npursuant to this TO Tariff and Section 24 of the ISO Tariff. The \nParticipating TO’s obligation to build will be subject to: (1) its ability, \nafter making a good faith effort, to obtain any necessary approvals and \nproperty rights under applicable federal, state, and local laws; (2) the \npresence of a cost recovery mechanism with cost responsibility assigned \nto accordance with the ISO Tariff or applicable FERC precedent; and \n(3) a signed Interconnection Agreement or a signed Expedited \nInterconnection Agreement, or, by mutual agreement of the parties, \nFERC acceptance for filing of an unexecuted Interconnection \nAgreement. \n8.1.5 Energization. The Participating TO shall not be obligated to energize, \nnor shall the applicant or wholesale load be entitled to have its \ninterconnection to the ISO Controlled Grid energized, unless and until"},{"page":232,"startToken":85450,"endToken":85720,"text":"an Interconnection Agreement has been executed, or filed at FERC \npursuant to Section 8.1.3, and become effective and such applicant or \nwholesale load has demonstrated to the ISO’s reasonable satisfaction \nthat it has complied with all of the requirements of the ISO Tariff and \nthe requirements of this TO Tariff. \n \n8.1.6 Coordination with ISO on Interconnection Requests. The \nParticipating TO shall coordinate with the ISO, pursuant to the \nprovisions of the TCA, in developing interconnection standards and \nguidelines for processing interconnection request under this TO \nTariff. \n \n8.2 \nParticipating TO Obligation to Construct Transmission Expansions or \nFacility Upgrades. The Participating TO shall be obligated to: (1) perform \nSystem Impact or Facility Studies where the Project Sponsor or the ISO agrees \nto pay the study cost and specifies the project objectives to be achieved, and (2) \nbuild transmission additions and facility upgrades where the Participating TO is \nobligated to construct or expand facilities in accordance with and subject to the \nlimitations under Section 24 of the ISO Tariff’ and this TO Tariff. \n \n8.2.1 Obligation to Construct. A Participating TO shall not be obligated to \nconstruct or expand transmission facilities or system upgrades unless \nand until the conditions stated in Section 9.2.1 hereof have been \nsatisfied. \n \n8.3 \nRequest for FERC Deference Regarding Need Determination. It is intended \nthat FERC grant substantial deference to the factual determinations of the ISO, \n(including the ISO’s ADR Procedures), the CPUC, WECC, or RTG coordinated \nplanning processes as to the need for or construction of a facility, the need for \nfull cost recovery, end the allocation of costs."},{"page":233,"startToken":85720,"endToken":86146,"text":"9. \nExpansionParticipating TO Process for Construction or Expansion of \nTransmission Facilities. Unless DesertLink is the lead Participating TO with \nrespect to a required system expansion, the provisions of Section 9 of this TO \nTariff, and its subparts, shall have no application to the Project or any other High \nVoltage Transmission Facilities, Low Voltage Transmission Facilities, or \nEntitlements turned over to the ISO’s operational control by DesertLink and the \ncorresponding provisions of the lead Participating TO’s TO Tariff shall govern. \n \n9.1 \nApplicability and Determination of Facilities. A Participating TO shall \nperform a Facilities Study in accordance with the Section where (1) the \nParticipating TO is obligated to construct or expand facilities in accordance \nwith Section 24 of the ISO Tariff and this TO Tariff (other than if the obligation \nto expand or construct is pursuant to Section 10 or 10A of this TO Tariff or the \nISO’s generator interconnection procedures); (2) a Market Participant agrees to \npay the costs of the Facilities Study and specifies the project objectives to be \nachieved in terms of increase capacity or reduce congestion; or \n (3) the Participating TO is required to perform a Facilities Study pursuant to the ISO Tariff. \n \n9.1.1 Payment of Facilities Study’s Cost. \n9.1.1.1 Market Participant to Pay for Facilities Study. Where a \nMarket Participant requests a Facilities Study and the need for \nthe transmission addition or upgrade has not been established in \naccordance with the procedures established herein and the ISO \nTariff, the Market Participant shall pay the cost of the Facilities \nStudy. \n \n9.1.1.2 Project Sponsor or Project Proponent to Pay for Facility \nStudy. Where the facilities to be added or upgraded have been \ndetermined to be needed in accordance with the procedures \nestablished herein, the Project Sponsor, Project Proponent, or the \nISO requesting the study shall pay in advance the reasonable \ncost of the Facilities Study. When the Participating TO is the \nProject Sponsor in accordance with the ISO Tariff, the costs of \nthe Facilities Study shall be recovered through its Access \nCharges and transmission rates. \n \n9.1.1.3 Principal Beneficiaries to Pay for Facilities Study. Where the \nfacilities to be added or upgraded have been determined to be \nneeded and the principal beneficiaries have been identified by the \nISO or ISO ADR Procedures in accordance with the ISO Tariff \nthe Project Sponsor and the identified principal beneficiaries \nshall pay the reasonable cost of the Facilities Study, in such \nproportions as may be agreed, or, failing agreement, as \ndetermined in accordance with the ISO ADR Procedures."},{"page":234,"startToken":86146,"endToken":86618,"text":"9.1.2 Payment Procedure. Where a Facilities Study is being conducted \npursuant to this TO TariffSection 9, the Participating TO shall, within \nthirty days of the receipt of all reasonably required information, tender to \nthe Market Participant, Project Sponsor, Project Proponent, ISO, or \nidentified principal beneficiaries, as the case may be, a Facilities Study \nAgreement that defines the scope, content, assumptions, and terms of \nreference for such study, the estimated time required to complete it, and \nsuch other provisions as the parties may reasonably require and pursuant \nto which such Market Participant, Project Sponsor, Project Proponent, the \nISO, or identified principal beneficiaries agree to reimburse the \nParticipating TO the reasonable cost of performing the required Facilities \nStudy. If the Market Participant, Project Sponsor, Project Proponent, the \nISO, or identified principal beneficiaries, as the case may be, agree to the \nterms of the Facilities Study Agreement, they shall execute the Facilities \nStudy Agreement and return it to the Participating TO within ten Business \nDays. Alternatively, if the Market Participant, Project Sponsor, Project \nProponent, the ISO, or identified principal beneficiaries, as the case may \nbe, request the Participating TO to proceed with the Facilities Study and \ncommit to abide by the terms, conditions, and cost assignments ultimately \ndetermined under the ISO ADR Procedures, including any determination \nby FERC or appeal of a FERC determination in accordance with that \nprocess, the Participating TO shall promptly proceed with the Facilities \nStudy, and the parties shall submit the disputed terms for resolution under \nthe ISO’s ADR Procedures. \n9.1.3 Facilities Study Procedures. Upon receipt of an executed Facilities Study \nAgreement or alternative request to proceed as provided for in Section \n9.1.2, a copy of which has been provided to the ISO by the party \nrequesting the Facilities Study, the Participating TO will use due diligence \nto complete the required Facilities Study within a sixty (60) day period. If \nthe Participating TO is unable to complete the Facilities Study in the \nallotted time period, the Participating TO shall notify the Market \nParticipant and provide an estimate of the time needed to reach a final \ndetermination along with an explanation of the reasons that additional time \nis required to complete the study. If additional time is required, the \nParticipating TO will use best efforts to complete the study within 10 \nmonths, provided adequate information is provided by all the parties. \n \n9.2 \nObligation to Build. \n9.2.1 Due Diligence to Construct. Subject to Section 9.3.3 of this TO \nTariff, the Participating TO shall use due diligence to construct, within \na reasonable time, additions or upgrades to its transmission system that \nit is obligated to construct pursuant to the ISO Tariff and this TO \nTariff. Alternatively, if a Market Participant requests the Participating \nTO to file an unexecuted Participation Agreement and commits to"},{"page":235,"startToken":86618,"endToken":87079,"text":"abide by the terms, conditions, and cost assignments determined to be \njust and reasonable under the ISO ADR Procedures, including any \ndetermination by FERC or on appeal of a FERC determination in \naccordance with that process, the Participating TO shall promptly file \nan unexecuted Participation Agreement. Provided, however, that if the \nISO ADR Procedures concerns whether the requesting entity is an \nEligible Customer, the Participating TO shall not be obligated to file \nan unexecuted Participation Agreement or alternatively, if a Market \nParticipant requests the Participating TO to file an unexecuted \nParticipation Agreement and commits to abide by the terms, \nconditions, and cost assignments determined to be just and reasonable \nunder the ISO ADR Procedures, including any determination by FERC \nor on appeal of a FERC determination in accordance with that process, \nthe Participating TO shall promptly file an unexecuted Participation \nAgreement. \nProvided, however, that if the ISO ADR Procedures concerns whether \nthe requesting entity is an Eligible Customer, the Participating TO shall \nnot be obligated to file an unexecuted Participation Agreement, \ncommence construction of the additions or upgrades or incur other costs \nunder the Participation Agreement until a final order determining the \njust and reasonable rates, terms, and conditions for such Participation \nAgreement has been issued by the applicable court or regulatory \nauthority. The Participating TO’s obligation to build will be subject to: \n1) its ability, after making a good faith effort, to obtain the necessary \napprovals and property rights under applicable federal, state, and local \nlaws; 2) the presence of a cost recovery mechanism with cost \nresponsibility assigned in accordance with the ISO Tariff or this TO \nTariff; and 3) a signed Participation Agreement. The Participating TO \nwill not construct or expand its existing or planned transmission system, \nif doing so would impair system reliability as determined through \nsystems analysis based on the Applicable Reliability Criteria. \n9.2.2 Delay in Construction or Expansion. If any event occurs that will \nmaterially affect the time for completion of new facilities, or the ability \nto complete them, the Participating TO shall promptly notify: (1) the \nProject Sponsor with regard to facilities determined to be needed; (2) \nthe Parties to the Participation Agreement with regard to facilities \ndetermined to be needed pursuant to the ISO Tariff where principal \nbeneficiaries were identified; and (3) the ISO. In such circumstances, \nthe Participating TO shall, within thirty days of notifying such Project \nSponsor, Parties to the Participation Agreement, and the ISO of such \ndelays, convene a technical meeting with such Project Sponsor, Parties \nto the Participation Agreement, and the ISO to discuss the \ncircumstances which have arisen and evaluate any options available. \nThe Participating TO also shall make available to such Project Sponsor, \nParties to the Participation Agreement, and the ISO, as the case may be,"},{"page":236,"startToken":87079,"endToken":87533,"text":"studies and work papers related to the cause and extent of the delay and \nthe Participating TO’s ability to complete the new facilities, including \nall information that is in the possession of the ParticipatingTO that is \ncircumstances which have arisen and evaluate any options available. \nThe Participating TO also shall make available to such Project Sponsor, \nParties to the Participation Agreement, and the ISO, as the case may be, \nstudies and work papers related to the cause and extent of the delay and \nthe Participating TO’s ability to complete the new facilities, including \nall information that is in the possession of the Participating TO that is \nreasonably needed to evaluate the alternatives. \nTO that is reasonably needed to evaluate the alternatives. \n \n9.2.2.1 Alternatives to the Original Facility Additions. If the review process \nof Section 9.2.2 determines that one or more alternatives exist to the \noriginally planned construction project, the Participating TO shall \npresent such alternatives for consideration to the Project Sponsor, \nParties to the Participation Agreement, and the ISO, as the case may \nbe. If upon review of any alternatives, such Project Sponsor, the ISO, \nor Parties to the Participation Agreement wish to evaluate or to proceed \nwith one of the alternative additions or upgrades, such Project Sponsor, \nthe ISO, or Parties to the Participation Agreement may request that the \nParticipating TO prepare a revised Facility Study pursuant to Sections \n9.1.1, 9.1.2, and 9.1.3 of this TO Tariff. In the event the Participating \nTO concludes that no reasonable alternative exists to the originally \nplanned addition or upgrade and the Project Sponsor or Parties to the \nParticipation Agreement or the ISO disagree, the dispute shall be \nresolved pursuant to the ISO ADR Procedure. \n \n9.2.2.2 Refund Obligation for Unfinished Facility Additions. If the \nParticipating TO and the Project Sponsor, the ISO, or Parties to the \nParticipation Agreement, as the case may be, mutually agree that no \nother reasonable alternatives exist, the obligation to construct the \nrequested additions or upgrades shall terminate and any deposit not yet \napplied toward the expended project costs shall be returned with interest \npursuant to FERC Regulation 35.1935.19a(a)(2)(iii). However, the \nProject Sponsor and any identified principal beneficiaries, as the case \nmay be, shall be responsible for all costs prudently incurred by the \nParticipating TO through the time the construction was suspended. \n \n9.3 \nProvisions Relating To Transmission Construction On the System \nOf Other TOs. \n9.3.1 Responsibility for Third Party Additions. A Participating TO \nshall not be responsible for making arrangements for any \nengineering, permitting, and construction of transmission or \ndistribution facilities on the system(s) of any other entity or for"},{"page":237,"startToken":87533,"endToken":87762,"text":"obtaining any regulatory approval for such facilities. The \nParticipating TO will undertake reasonable efforts through the \ncoordinated planning process to assist in making such arrangements, \nincluding, without limitation, providing any information or data \nrequired by such other electric system pursuant to Good Utility \nPractice. \n9.3.2 Coordination of Third-Party System Additions. Where transmission \nadditions or upgrades being built pursuant to the ISO Tariff require \nadditions or upgradeson other systems, to the extent consistent with \nSection 9.3.3 of this TO Tariff, the Participating TO shall coordinate \nconstruction on its own system with the construction required by others. \nThe Participating TO, after consultation with the ISO, the Project \nSponsor, and Parties to the Participation Agreement, as the case may be, \nmay defer construction if the new transmission facilities on another \nsystem cannot be completed in a timely manner. The Participating TO \nshall notify such Project Sponsor, Parties to the Participation Agreement, \nand the ISO, in writing of the basis for any decision to defer construction \nand the specific problems which must be resolved before it will initiate or \nresume construction of the new facilities. Within forty Business Days of \nreceiving written notification by the Participating TO of its intent to defer \nconstruction pursuant to this section, such Project Sponsor, Parties to the \nParticipation Agreement, or the ISO may challenge the decision in \naccordance with the ISO ADR Procedure."},{"page":238,"startToken":87762,"endToken":88190,"text":"10. \nTSWL Interconnection Process. Unless DesertLink is the lead Participating \nTO with respect to a requested interconnection, the provisions of Section 10 of this TO \nTariff, and its subparts, shall have no application to the Project or any other High \nVoltage Transmission Facilities, Low Voltage Transmission Facilities, or Entitlements \nturned over to the ISO’s operational control by DesertLink and the corresponding \nprovisions of the lead Participating TO’s TO Tariff shall govern. All requests for \ninterconnectionTSWL Interconnection with the Project or any other High Voltage \nTransmission Facilities, Low Voltage Transmission Facilities, or Entitlements turned \nover to the ISO’s operational control by DesertLink shall be directed to the lead \nParticipating TO, with notice of the request provided to DesertLink. \n \n10.1 \nApplicability. All requests for TSWL Interconnection directly to the ISO \nControlled Grid from parties eligible to request such Interconnection consistent \nwith Section 210(a) of the FPA shall be processed pursuant to the provisions of \nthis Section 10. All requests for Interconnection of wholesale generation directly \nto the ISO Controlled Grid shall be processed pursuant to the provisions of the \nISO Tariff. Requests for interconnection submitted by an ECLL on behalf of \nLarge Load Customers shall be processed pursuant to Section 10A of this TO \nTariff. \n \n10.2 \nTSWL Interconnection Applications. Except as provided in Section 10.2.1, a \npartyAn applicant requesting TSWL Interconnection shall submit a written \nTSWL Interconnection Application which provides the information required in \nSection 10.3detailed below to the Participating TO and shall send a copy of the \napplication to the ISO. The Participating TO shall timestamp the application to \nestablish study priority.  \n10.3 \nInterconnection Application. An Interconnection Application shall \nprovide all the information listed in 18 CFR § 2.20, including, but not \nlimited to, the following:  \n \n(i) the identity, address, telephone \nnumber, and facsimile numberemail of the entityapplicant requesting TSWL \nInterconnection;  \n \n \n(ii) the Interconnection point(s) to the ISO Controlled Grid contemplated by \nthe applicant;  \n \n \n(iii) the resultant (or new) maximum amount of TSWL Interconnection \ncapacity contemplated by the applicant;  \n \n \n(iv) the proposed date for energizing the TSWL Interconnection and the \nterm of the Interconnectioninterconnection service, and  \n \n \n(v) such other information as the Participating TO reasonably required to \nprocess the application.  \n \n \nIn addition to the information specified above, the following information may \nalso be provided in order to properly evaluate system conditions:  \n \n \n \n(vi) If the applicant is a wholesale load, the electrical location of the source of \nthe power (if known) to be transmitted pursuant to applicant’s request for \nInterconnection. If the source of the power is not known, a system purchase"},{"page":239,"startToken":88190,"endToken":88624,"text":"will be assumed. If the location of the load is not known, a system sale will be \nassumed; and, in addition, if an applicant proposes to perform or cause a third \nparty to perform any required System Impact Study or any required Facilities \nStudy, it shall so indicate in its Interconnection Application.  \n \n \nThe results of any study or studies performed by an applicant must be approved \nby both the ISO and the Participating TO. Within tenWithin ten (10) Business \nDays after receipt of ana TSWL Interconnection Application, the Participating TO \nand the ISO if applicable shall determine whether the application is complete \n(“Completed TSWL Interconnection AgreementApplication”). Whenever \npossible, the participating TO will attempt to remedy deficiencies in the TSWL \nInterconnection Application through informal communications with the applicant. \nIf such efforts are unsuccessful, the Participating TO shall return the \nInterconnection Application to the applicant.  \nThe Participating TO will treat the information in the TSWL Interconnection \nAgreementApplication, including the applicant’s identity, as confidential at the \nrequest of the applicant except to the extent that disclosure of the information is \nrequired by this TO Tariff, by regulatory or judicial order, for reliability purposes \npursuant to Good Utility Practice, or pursuant to RTG or ISO transmission \ninformation sharing agreements. The Participating TO shall treat this information \nconsistent with the standards of conduct contained in Part 37 of FERC’s \nregulations. \n10.3.110.2.1 \nAmendment to Completed TSWL Interconnection \nApplication. An applicant shall only be limited to amending its \nCompleted TSWL Interconnection Application once. Such amendment \nshall occur on or before ten (10) Business Days following the date the \nParticipating TO tenders any Facilities Study Agreement. Specifically, an \napplicant may submit an amendment to its Completed TSWL \nInterconnection Application to reflect a revised configuration for its New \nFacility. The amended Completed TSWL Interconnection Application \nshall be treated in accordance with Section 25 of the ISO Tariff and \nSection 10.5 of this TO Tariff; the applicant’s Completed TSWL \nInterconnection Application shall be deemed withdrawn; and the \napplicant shall maintain its existing queue position, if (a) the amended \nCompleted TSWL Interconnection Application is received by the \nParticipating TO within ten (10) Business Days of the Participating TO’s \ntender of a Facilities Study Agreement; and (b) the applicant has not \nsubmitted a previous amendment to the Completed TSWL \nInterconnection Application. In the event an applicant amends its \nCompleted TSWL Interconnection Application, it will be responsible for \nany additional study costs that result from that amendment, including \ncosts associated with revisions to studies for other applicants holding later \nqueue positions. \n \n10.410.3 Review of Completed TSWL Interconnection Application. After receiving"},{"page":240,"startToken":88624,"endToken":89122,"text":"a Completed TSWL Interconnection Application, the Participating TO and the \nISO, if applicable, will determine on a non-discriminatory basis whether a \nSystem Impact Study is required. Whenever the Participating TO, and the ISO, if \napplicable, determines that a System impact Study is not required and that neither \nReliability Upgrades nor changes in existing operating procedures are required, \nthe Participating TO shall notify the applicant within fifteen (15) Business Days \nof the Completed Application Date. If the TSWL Interconnection can be \naccommodated without any Direct Assignment Facilities, then within thirty (30) \nBusiness Days of such notice from the Participating TO, the applicant shall \nrequest the Participating TO to tender to the applicant an Interconnection \nAgreement within thirty (30) Business Days of such request. The Participating \nTO shall tender to the applicant an Interconnection Agreement as \nprovideprovided in this Section 8.1.310. If the Participating TO determines upon \nreview of the Completed TSWL Interconnection Application, that Direct \nAssignment Facilities are required, the Participating TO shall tender to the \napplicant a Facilities Study Agreement within twenty (20) Business Days of the \nCompleted Application Date and continue the Interconnection process pursuant \nto Section 10.8. \n \n10.510.4 Notice of Need for System Impact Study. If the Participating TO, and the ISO, \n if applicable, determines that a System Impact Study is necessary to accommodate the \nrequested Interconnection, the Participating TO shall so inform the applicant as \nsoon as practicable. In such cases, the Participating TO shall within twenty (20) \nBusiness Days of receipt of a Completed TSWL Interconnection Application, \ntender a System Impact Study Agreement that defines the scope, content, \nassumptions and terms of reference for such study to be completed by the \nParticipating TO, the estimated time required to complete it, and such other \nprovisions as the parties may reasonably require, and pursuant to which the \napplicant shall agree to reimburse the Participating TO for the reasonable actual \ncosts of performing the required System Impact Study. A description of the \nParticipating TO’s transmission assessment practices for completing a System \nImpact Study shall be provided in the Participating TO’s FERC Form 715. \nAlternatively, if the applicant will perform the System Impact Study, the \nParticipating TO shall within twenty (20) Business Days of receipt of a \nCompleted TSWL Interconnection Application, tender a System Impact Study \nAgreement that defines the scope, content, assumptions and terms of reference \nfor such study to be reviewed by the Participating TO; the estimated time \nrequired to complete it; and such other provisions as the parties may reasonably \nrequire, and pursuant to which the applicant shall agree to reimburse the \nParticipating TO for the reasonable actual costs of reviewing the required \nSystem Impact Study.  \nFor ana TSWL Interconnection request to remain a Completed TSWL \nInterconnection Application, the applicant shall execute the System Impact \nStudy Agreement and return it to the Participating TO within ten (10) Business \nDays together with payment for the reasonable estimated cost of performing the \nSystem Impact Study or reviewing the applicant’s System Impact Study."},{"page":241,"startToken":89122,"endToken":89608,"text":"Alternatively, if the applicant request the Participating TO to proceed with the \nSystem Impact Study or review thereof and commits to abide by the terms, \nconditions, and cost assignments ultimately determined under the ISO ADR \nProcedures, including any determination by FERC or appeal of a FERC \ndetermination in accordance with that process, the Participating TO shall \npromptly proceed with the System Impact Study provided that such request is \naccompanied by payment of the reasonable estimated cost of the System Impact \nStudy, and the parties shall submit the disputed terms for resolution under the \nISO’s ADR Procedures. If the applicant elects not to execute a System Impact \nStudy Agreement, and does not request that the Participating TO proceed with \nthe System Impact Study or review thereof, its application shall be deemed \nwithdrawn, and the applicant shall reimburse to the Participating TO all costs \nreasonably incurred in processing the application. \n \n10.6 \n10.5 \nSystem Impact Study Cost Reimbursement and Agreement. \n10.6.110.5.1 \nCost Reimbursement. The System Impact Study \nAgreement shall clearly specify the charge, based on the Participating \nTO’s estimate of the cost and time for completion of the System \nImpact Study. The charge shall not exceed the reasonable actual cost \nof the study. In performing the System Impact Study, the Participating \nTO shall rely, to the extent reasonably practicable, on existing \ntransmission planning studies. The applicant will not be assessed a \ncharge for such existing studies; however, the applicant will be \nresponsible for the reasonable charges associated with any \nmodifications to existing planning studies that are reasonably \nnecessary to evaluate the impact on the applicant’s request. \n \n10.6.2 Multiple Parties. If multiple parties request Interconnection at the \nsame location, the participating TO may conduct a single System \nImpact Study. The costs of that study shall be pro-rated among the \nparties requesting Interconnection. \n10.710.6 System Impact Study Procedures. Upon receipt of an executed System \nImpact Study Agreement or initiation of the ISO ADR Procedures and receipt \nof payment for estimated study costs, the Participating TO will use due \ndiligence to either (a) complete the required System Impact Study within a \nsixty (60) calendar day period or (b) complete its review of an applicant’s \nSystem Impact Study within thirty (30) calendar days of its receipt of the \ncompleted study. The System Impact Study will identify whether any Direct \nAssignment Facilities or Reliability Upgrades are necessary to deliver a New \nFacility’s full output over the ISO Controlled Grid, or any transmission \nadditions or upgrades are necessary to serve a wholesale load. The System \nImpact Study will also identify any adverse impact on Encumbrances existing \nas of the applicant’s Completed Application Date. In the event that the \nParticipating TO is unable to complete the required System Impact Study \nwithin such time period, it shall so notify the applicant, in writing, and provide \nan estimated completion date along with an explanation of the reasons why"},{"page":242,"startToken":89608,"endToken":90108,"text":"additional time is required to complete the required studies. A copy of the \ncompleted System Impact Study and related work papers shall be made \navailable to the applicant and the ISO. The Participating TO shall notify the \napplicant and the ISO immediately upon completion of the System Impact \nStudy. \n \n10.7.110.6.1 \nProcedures Upon Completion of System Impact Study. \nWithin fifteen (15) Business Days of completion of the System Impact \nStudy or review and approval of an applicant’s System Impact Study, the \nParticipating TO shall notify the applicant whether the transmission \nsystem will be adequate to accommodate all of a request for \nInterconnection. If no costs are likely to be incurred for any Direct \nAssignment Facilities, any Reliability Upgrades, or implementing any \noperating procedures, then within thirty (30) Business Days of receipt of \nwritten approval of the applicant’s System Impact Study from the \nParticipating TO and the ISO the applicant shall request the Participating \nTO to tender an Interconnection Agreement within thirty (30) Business \nDays of such request. The Participating TO shall tender to the applicant \nan Interconnection Agreement as provided in Section 8.1.310.9. If costs \nare likely to be incurred to accommodate a request for Interconnection, \nthe Participating TO shall tender to the applicant a Facilities Study \nAgreement pursuant to Section 10.8. \n \n10.810.7 Notice of Need for Facilities Study. If a System Impact Study indicates that \nadditions or upgrades to the ISO Controlled Grid are needed to satisfy an \napplicant’s request for interconnection, the Participating TO shall, within fifteen \n(15) Business Days of the date of the System Impact Study or the completion of \nreview and approval of the applicant’s System Impact Study by the Participating \nTO, tender to the applicant a Facilities Study Agreement that defines the scope, \ncontent, assumptions and terms of reference for such study to be completed by \nthe Participating TO; the estimated time required to complete the required study; \nand such other provisions as the parties may reasonably require, and pursuant to \nwhich the applicant agrees to reimburse the Participating TO for the reasonable \nactual costs of performing the required Facilities Study. Alternatively, if the \napplicant will perform the Facilities Study, the Participating TO shall within \nfifteen (15) Business Days of the completion date of the System Impact Study or \nthe completion of review and approval of the applicant’s System Impact Study, \ntender a Facilities Study Agreement that defines the scope, content, assumptions \nand terms of reference for such study to be reviewed by the Participating TO; the \nestimated time required to complete the required review; and such other \nprovisions as the parties may reasonably require, and pursuant to which the \napplicant agrees to reimburse the Participating TO for the reasonable actual costs \nof reviewing the required Facilities study. For an Interconnection request to \nremain a Completed TSWL Interconnection Application, the applicant shall \nexecute the Facility StudiesFacilities Study Agreement and return it to the \nParticipating TO within ten (10) Business Days together with payment for the"},{"page":243,"startToken":90108,"endToken":90589,"text":"reasonable estimated costs of performing the Facilities Study or reviewing the \napplicant’s Facilities Study. Alternatively, if the applicant request the \nParticipating TO to proceed with the Facilities Study toor review thereof and \ncommits to abide by terms, conditions, and cost assignments ultimately \ndetermined under the ISO ADR Procedures, including any determination by \nFERC or appeal of a FERC determination in accordance with that process, the \nParticipating TO shall promptly proceed with the Facilities Study provided that \nsuch request is accompanied by payment for the reasonable estimated cost of the \nFacilities Study, and the parties shall submit the disputed terms for resolution \nunder the ISO ADR Procedures. If the applicant elects not to execute a Facilities \nStudy Agreement and does not request that the Participating TO proceed with the \nFacilities Study or review thereof, its application shall be deemed withdrawn and \nthe applicant shall reimburse to the Participating TO all costs reasonably incurred \nin processing the application not covered by the System Impact Study \nAgreement. \n \n10.910.8 Facilities Study Procedures. Upon receipt of an executed Facilities Study \nAgreement or initiation of the ISO ADR Procedures and receipt of payment for \nthe estimated study costs, the Participating TO will use due diligence to either \n(a) complete the required Facilities Study within a sixty (60) calendar day \nperiod or (b) complete its review of an applicant’s Facilities Study within thirty \n(30) calendar days of its receipt of the Completed Study. In the event that \nParticipating TO is unable to complete the required Facilities Study within such \ntime period, it shall so notify the applicant, in writing, and provide an estimated \ncompletion date along with an explanation of the reasons why additional time \nis required to complete the required studies. A copy of the completed Facilities \nStudy shall be made available to the applicant. \n \n10.9.1 Execution10.8.1 Tender of Interconnection Agreement. Within thirty \n(30) Business Days of receipt of the completed Facilities Study \nperformed by the Participating TO or receipt of written approval of the \napplicant’s Facilities Study from the Participating TO, the applicant shall \nrequest the Participating TO to tender an Interconnection Agreement \nwithin thirty (30) Business Days of such request. The Participating TO \nshall tender to the applicant an Interconnection Agreement as provided in \nSection 8.1.310.9. \n \n10.9 \nInterconnection Agreement.  \nPursuant to Section 10.3, 10.6.1, or 10.8.1, a \nparty requesting Interconnection shall request in writing that the Participating \nTO tender to such party an Interconnection Agreement that will be filed with \nFERC, or the Local Regulatory Authority, in the case of a Local Publicly \nOwned Electric Utility. The Interconnection Agreement shall include, without \nlimitation, cost responsibilities and payment provisions for any engineering, \nequipment, construction, ownership, operation and maintenance costs for any \nDirect Assignment Facilities, any Reliability Upgrades, and for any other \nmitigation measures. The Interconnection Agreement will set forth a payment"},{"page":244,"startToken":90589,"endToken":91068,"text":"schedule that enables the Participating TO to recover its costs. \n \n \nFor a TSWL Interconnection request to remain a Completed TSWL \nInterconnection Application, the applicant requesting the Interconnection or the \nentity with whom the Participating TO will interconnect for the Interconnection \nshall execute the Interconnection Agreement and return it to the Participating \nTO within thirty (30) Business Days of receipt. Alternatively, if an applicant \nrequesting the TSWL Interconnection or the entity with whom the Participating \nTO will interconnect for the Interconnection requests the Participating TO to file \nan unexecuted Interconnection Agreement and commits to abide by the terms, \nconditions, and cost assignments determined to be just and reasonable under the \nISO ADR Procedures, including any determination by FERC or on appeal of a \nFERC determination in accordance with that process, the Participating TO shall \npromptly file an unexecuted Interconnection Agreement. Provided, however, \nthat if the ISO ADR Procedures concerns whether the requesting entity is a \neligible for a TSWL Interconnection, the Participating TO shall not be obligated \nto file an unexecuted Interconnection Agreement or commence construction of \nany facilities or incur other costs under the Interconnection Agreement until a \nfinal order determining the just and reasonable rates, terms, and conditions for \nsuch Interconnection Agreement has been issued by the applicable court or \nregulatory authority. If the applicant or the entity with whom the Participating \nTO will interconnect for the Interconnection elects not to execute the \nInterconnection Agreement and does not request the Participating TO to file an \nunexecuted Interconnection Agreement, its Completed TSWL Interconnection \nApplication shall be deemed withdrawn, and the applicant shall reimburse to the \nParticipating TO all costs reasonably incurred in processing the application not \ncovered by any System Impact Study Agreement or Facilities Study Agreement.  \n \n \nWhere a TSWL Interconnection will serve one or more Large Loads, as a \ncondition to the Participating TO’s design, procurement, construction, or \noperation of any Large Load-Driven Upgrades (as defined in the pro forma \nLarge Load Cost Recovery Agreement set forth in Appendix V) associated with \nthe TSWL Interconnection, the applicant or Eligible Customer shall also, within \nthe same period and subject to the same consequences as the Interconnection \nAgreement, execute and maintain a Cost Recovery Agreement substantially in \nthe form set forth in Appendix V to this TO Tariff, or, if the applicant or \nEligible Customer requests that the Cost Recovery Agreement be filed \nunexecuted with FERC, comply with that agreement as made effective by \nFERC, in each case as applicable to the requested TSWL Interconnection. \nDisputes arising under a Cost Recovery Agreement shall be resolved under the \ndispute resolution provisions of that agreement. \n \n10.10 Partial Interim Service. If the Participating TO determines that there will not \nbe adequate transmission capability to satisfy the full amount requested in a \nCompleted TSWL Interconnection Application, the Participating TO nonetheless \nshall be obligated to offer and provide the portion of the requested TSWL"},{"page":245,"startToken":91068,"endToken":91386,"text":"Interconnection that can be accommodated without any additional Direct \nAssignments Facilities or Reliability Upgrades. However, the Participating TO \nshall not be obligated to provide the incremental amount of requested TSWL \nInterconnection that requires such additional facilities or upgrades until such \nfacilities or upgrades have been placed in service. \n \n10.11 Expedited Interconnection Procedures. In lieu of the procedures set forth \nabove, the applicant shall have the option to expedite the processing of its \nCompleted TSWL Interconnection Application. In order to exercise this option, \nthe applicant shall submit in writing a Request for Expedited Interconnection \nProcedures to the Participating TO within ten (10) Business Days after receiving \na copy of the System Impact Study for the proposed TSWL Interconnection. \nWithin ten (10) Business Days after receiving a Request for Expedited \nProcedures, the Participating TO shall tender an Expedited Interconnection \nAgreement that requires the applicant to compensate the Participating TO for all \ncosts reasonably incurred pursuant to the terms of this ToTO Tariff for \nprocessing the Completed TSWL Interconnection Application and providing the \nrequested Interconnection. While the Participating TO agrees to provide the \napplicant with its best estimate of the costs of any needed Direct Assignment \nFacilities and, if applicable, Reliability Upgrades, and such other charges that \nmay be incurred, unless otherwise agreed by the parties, such estimate shall not \nbe binding and the applicant must agree in writing to compensate the \nParticipating TO for all actual TSWL Interconnection costs reasonably incurred \npursuant to the provisions of this TO Tariff. The applicant shall execute and \nreturn such Expedited ServiceInterconnection Agreement within ten (10) \nBusiness Days of its receipt or the applicant’s request for Interconnection will \ncease to be a Completed TSWL Interconnection Application and will be deemed \nterminated and withdrawn,. In that event, the applicant shall reimburse the \nParticipating TO for all costs reasonably incurred in processing the application \nnot covered by the terms of the System Impact Study Agreement."},{"page":246,"startToken":91386,"endToken":91771,"text":"10A. Interconnection Process for ECLL Interconnections. All requests for ECLL \nInterconnection shall be directed to the Participating TO. \n \n10A.1 \nApplicability. An ECLL Interconnection must be requested in order to \nconnect the facilities of the Participating TO to the facilities of an ECLL \nthat has received a request to connect and provide retail transmission \nservice to a Large Load Customer. \n \n10A.2 ECLL Application and Application Fee \n \n10A.2.1 \nApplication Contents. An ECLL requesting an ECLL Interconnection \nshall submit an ECLL Interconnection Application in the form of \nAttachment 1 to Appendix VI, which provides the following required \ninformation, and shall send a copy of the application to the ISO. The \nECLL Interconnection Application and all supporting documentation shall \nbe submitted electronically to the Participating TO in the manner posted \non the Participating TO’s public website. \n \n(a) \nthe identity, address, telephone number, and email of the ECLL; \n(b) \nthe Point of Withdrawal; \n(c) \na proposed Large Load Customer load ramp schedule identifying \nanticipated load additions over time and the Large Load Customer’s \nmaximum load; \n(d) \na site plan; \n(e) \ndocumentation demonstrating that the Large Load Customer has Site \nControl; \n(f) \ndocumentation demonstrating that the Large Load Customer has local \npermits and regulatory approvals for development of its Large Load; \n(g) \na single-line electrical diagram; \n(h) \nthe electrical location of the source of the power (if known) to be \ntransmitted pursuant to the ECLL’s request for ECLL Interconnection. If \nthe source of the power is not known, a system purchase will be assumed; \n(i) \ndisclosure of ECLL interconnection requests in the ECLL’s footprint that \nare for the same Large Load Customer or any of its affiliate(s); \n(j) \na completed technical data form in the form of Appendix A to Attachment \n1 to Appendix VI; \n(k) \nif the Large Load Customer will be a Co-Located Large Load, information \nconcerning the relevant Generating Facility must be provided by the \nECLL. Such information may be either: (1) if the Generating Facility has \nnot signed a generator interconnection agreement, the identifying queue \nnumber of the Generating Facility; or (2) if the Generating Facility has \nsigned a generator interconnection agreement, information that will allow \nthe Participating TO to identify such agreement; and \n(l) \nthe proposed date for energizing the ECLL Interconnection and the \nproposed term of the ECLL Interconnection service."},{"page":247,"startToken":91771,"endToken":92181,"text":"10A.2.2 \nParticipating TO Review of ECLL Interconnection Application. \nWithin ten (10) Business Days after receipt of an ECLL Interconnection \nApplication, the Participating TO shall determine whether the application \nis complete (“Completed ECLL Interconnection Application”). Wherever \npossible, the Participating TO will attempt to remedy deficiencies in the \nECLL Interconnection Application through informal communications with \nthe ECLL. If such efforts are unsuccessful, the Participating TO shall \nreturn the ECLL Interconnection Application to the ECLL. \n \nThe Participating TO will treat the information provided in the ECLL Interconnection \nApplication, including the ECLL’s and Large Load Customer’s identity, as \nconfidential at the request of the ECLL except to the extent that disclosure of this \ninformation is required by this TO Tariff or the ISO Tariff, by regulatory or judicial \norder, for reliability purposes pursuant to Good Utility Practice, or pursuant to RTG \nor ISO transmission information sharing agreements. The Participating TO shall treat \nthis information consistent with the standards of conduct contained in Part 37 of \nFERC’s regulations. \n \n10A.3 Study Process and ECLL Interconnection Agreement. ECLL Interconnection \nApplications shall be processed, and ECLL Interconnection Agreements shall be \ntendered, executed, and filed, in accordance with the Large Load Interconnection \nProcedures set forth in Appendix VI. Disputes arising under a Cost Recovery \nAgreement shall be resolved under the dispute resolution provisions of that \nagreement. \n \n10A.4 Interim Service \n \n10A.4.1 \nInterim Firm Interconnection Service and Flexible Interim Load \nInterconnection (FILI) Service. If the ECLL has requested Interim Firm \nInterconnection Service and/or FILI Service, the Participating TO shall \nperform an analysis and report the extent to which the requested interim \nservices can be provided, prior to such time that all ECLL Interconnection \nFacilities are in service and the Large Load Customer is authorized to \nwithdraw Energy. However, the Participating TO shall not be obligated to \nprovide any amount of Firm Interconnection Service requested until \nnecessary facilities have been placed in service. FILI Service will be \navailable for all remaining Load that cannot receive Interim Firm \nInterconnection Service, if the Large Load Customer has the ability to \nreduce the load at a specified point of interconnection according to the \ntimelines and protocols set forth in an executed and effective FILI Service \nAgreement, until the ECLL Interconnection Facilities are in service. As \nECLL Interconnection Facilities are placed into service and transmission \ninterconnection capability is increased, available quantities of Firm \nInterconnection Service and FILI Service will be updated and reflected in \nthe applicable FILI Service Agreement."},{"page":248,"startToken":92181,"endToken":92603,"text":"If the Large Load Customer seeks FILI Service, the ECLL will ensure that \nthe Large Load Customer signs a FILI Service Agreement developed by \nthe Participating TO, or asks for the agreement to be filed unexecuted. \n \n10A.4.2 \nStudy Process for Interim Service and Determination of Availability \nof Interim Firm Interconnection Service and FILI Service. The \nParticipating TO shall perform a FILI Study in accordance with Section \n4.6.2 of Appendix VI to determine the maximum amount of any Interim \nFirm Interconnection Service, if any, and FILI Service, if any, that may be \nprovided based on the anticipated availability of transmission capacity \nonce the Large Load Customer is permitted to withdraw energy by the \nECLL. The Participating TO shall update this analysis under the terms of \nthe FILI Service Agreement, at least annually. \n \nThe actual amount of any FILI Service to be provided during any \noperating period shall be determined by the Participating TO through \noperational assessments and analysis conducted closer to real-time \noperating conditions. Accordingly, the maximum FILI Service established \nin the annual analysis does not guarantee the availability of such service \nunder actual system conditions. \n \n10A.4.3 \nConditions Related to FILI Service \n \n10A.4.3.1 FILI Service Reliability Requirements. The FILI Service \nAgreement will identify what ECLL Interconnection Facilities must be \ninstalled, the necessary protection and control systems and any other \nequipment necessary to be installed, and operating limitations to allow the \nLarge Load Customer to withdraw energy (“FILI Service Reliability \nRequirements”). FILI Service shall not commence until the Participating TO \nand ECLL have completed installation and commissioning of all equipment \nspecified under the FILI Service Agreement. \n \n10A.4.3.2 Curtailment of FILI Service. FILI Service is subject to \ncurtailment at all times, unless the Participating TO’s right to curtail is \nexpressly conditioned or otherwise limited in an executed and effective FILI \nService Agreement. A Large Load Customer receiving FILI Service shall be \nsubject to curtailment prior to any curtailment of customers receiving Firm \nInterconnection Service. The Participating TO and ISO may curtail FILI \nService as necessary to maintain the reliable operation of the ISO Controlled \nGrid, including during normal operating conditions. \n \n10A.4.3.3 Exceedance of Authorized FILI Service. An ECLL shall ensure \nthat the operating instructions issued by the Participating TO pursuant to a \nFILI Service Agreement are not exceeded at the relevant Point of Withdrawal. \nThe Participating TO shall have the right to disconnect service to the Large \nLoad Customer in the event that energy withdrawals violate the terms of the"},{"page":249,"startToken":92603,"endToken":92910,"text":"FILI Service Agreement. The Participating TO shall follow Good Utility \nPractice in carrying out any such disconnection and subsequent reconnection \nwhen the conditions for such reconnection set forth in the FILI Service \nAgreement have been met. Nothing in this TO Tariff prevents the ISO from \napplying any financial penalties applicable to Large Load Customers. \n10A.5 Co-Located Large Load. The interconnection processes applicable to a Co-Located \nLarge Load shall be determined based on whether the Generating Facility is a (1) \nnon-exporting Generating Facility interconnected in accordance with the generator \ninterconnection rules of the applicable ECLL, as approved by its Local Regulatory \nAuthority (including, for a UDC subject to the jurisdiction of the CPUC, CPUC \nElectric Rule 21); or (2) an exporting Generating Facility subject to the applicable \nISO generator interconnection procedures and requirements. The ECLL for a Co-\nLocated Large Load connecting to facilities of an exporting Generating Facility will \nbe subject to this Section 10A. \nFor a Co-Located Large Load interconnected to the facilities of an exporting \nGenerating Facility, the ISO will be a party to a pro forma agreement that bridges the \npro forma Large Generator Interconnection Agreement (LGIA) with the ECLL \nInterconnection Agreement, or will negotiate a non-conforming LGIA to account for \ncertain details of the Co-Located Large Load interconnection on an individual basis. \nThe Generating Facility developer will also execute an ISO pro forma Participating \nGenerator Agreement for the Generating Facility, but not a Participating Load \nAgreement for the Co-Located Large Load. \n10A.6 Large Load Cost Recovery Agreement. As a condition to the Transmission \nOwner’s design, procurement, construction, or operation of a Large Load-Driven \nUpgrade, the Eligible Customer shall execute and maintain a Large Load Cost \nRecovery Agreement substantially in the form set forth in Appendix V to this \nTO Tariff, as applicable to the requested service and associated Large Load \nFacility."},{"page":250,"startToken":92910,"endToken":93125,"text":"13. \nCreditworthiness \n13.1 \nUDCs, MSSs, and Scheduling Coordinators Using the Participating TO’s Low Voltage \nTransmission Facilities. For the purpose of determining the ability of a UDC, MSS, and \nScheduling Coordinator to meet its obligations related to service using the Participating TO’s \nLow Voltage Transmission Facilities hereunder, where the Participating TO is collecting the \nLow Voltage Access Charge directly from each UDC, MSS and Scheduling Coordinator, the \nParticipating TO may require reasonable credit review procedures for the UDC, MSS, or \nScheduling Coordinator. This review shall be made in accordance with standard commercial \npractices. In addition, the Participating TO may require the UDC, MSS, or Scheduling \nCoordinator to provide and maintain in effect during the term of the service, an unconditional \nand irrevocable letter of credit as security to meet its responsibilities and obligations under \nthis TO Tariff, or an alternative form of security proposed by the UDC, MSS, or Scheduling \nCoordinator and acceptable to the Participating TO, and consistent with commercial practices \nestablished by the Uniform Commercial Code, that protect the Participating TO against the \nrisk of non-payment. \n13.2 \nEnd-Users. Creditworthiness and security rules applicable to End-Users shall be \npursuant to the then-current rules of the applicable Local Regulatory Authority and \nany agreement under this TO Tariff to which the End-User is a party."},{"page":251,"startToken":93125,"endToken":93229,"text":"14. \nDisputes. Except as limited below, as provided in Sections 10.9 and 10A.3, or as \notherwise limited by law, the ISO ADR procedures shall apply to all disputes between parties \nwhich arise under this TO Tariff or under or in respect of the proposed terms and conditions of \na Facilities Study Agreement, System Impact Study Agreement or Expedited \nServiceInterconnection Agreement. The ISO ADR Procedures set forth in Section 13 of the ISO \nTariff shall not apply to disputes as to whether rates and charges set forth in this TO Tariff \n(other than charges for studies) are just and reasonable under the FPA."},{"page":252,"startToken":93229,"endToken":93689,"text":"16. \nMiscellaneous. \n16.1 \nNotices. Any notice, demand, or request in accordance with this TO Tariff, \nunless otherwise provided in this TO Tariff, shall be in writing and shall be \ndeemed properly served, given, or made: (i) upon delivery if delivered in \nperson or electronically via email, (ii) five days after deposit in the mail if sent \nby first class United States mail, postage prepaid, (iii) upon receipt of \nconfirmation by return electronic facsimile if sent by facsimile, or (iv) upon \nParty at the address set forth in Appendix IVII. Any Party may at any time, by \nnotice to the other Parties, change the designation or address of the person \nspecified in Appendix IVII to receive notice on its behalf. Any notice of a \nroutine character in connection with service under this TO Tariff or in \nconnection with operation of facilities shall be given in such a manner as the \nParties may determine from time to time, unless otherwise provided in this TO \nTariff. \n \n16.2 \nWaiver. Any waiver at any time by any Party of its rights with respect to any \ndefault under this TO Tariff, or with respect to any other matter arising in \nconnection with this TO Tariff, shall not constitute or be deemed a waiver with \nrespect to any subsequent default or other matter arising in connection with this \nTO Tariff. Any delay short of the statutory period of limitations in asserting or \nenforcing any right shall not constitute or be deemed a waiver. \n \n16.3 \nConfidentiality. \n \n16.3.1 Maintaining Confidentiality If Not for Public Disclosure. The \nParticipating TO shall maintain the confidentiality of all of the \ndocuments, data, and information provided to it by any other Market \nParticipant that such Market Participant may designate as confidential, \nprovided, however, that the information will not be held confidential \nby the Participating TO if (1) the Participating TO or Market \nParticipant is required to provide such information for public \ndisclosure pursuant to this TO Tariff or applicable regulatory \nrequirements, or (2) the information becomes available to the public \non a non-confidential basis (other than from the Participating TO). \n \n16.3.2 Disclosure of Confidential Information. Notwithstanding anything in \nthis Section 16.3 to the contrary, if the Participating TO or any Market \nParticipant is required by applicable laws or regulations, or in the course \nof administrative or judicial proceedings, to disclose information that is \notherwise required to be maintained in confidence pursuant to this \nSection 16.3, the Participating TO or Market Participant may disclose \nsuch information; provided, however, that as soon as such Participating \nTO or Market Participant learns of the disclosure requirement and prior \nto making such disclosure, such Participating TO or Market Participant \nshall notify the affected Participating TO or Market Participants of the"},{"page":253,"startToken":93689,"endToken":94143,"text":"requirement and the terms thereof. The affected Participating TO or \nMarket Participants may, at their sole discretion and own costs, direct \nany challenge to or defense against the disclosure requirement and the \ndisclosing Participating TO or Market Participant shall cooperate with \nsuch affected Participating TO or Market Participants to the maximum \nextent practicable to minimize the disclosure of the information \nconsistent with applicable law. The disclosing Participating TO or \nMarket Participant shall cooperate with the affected Participating TO or \nMarket Participants to obtain proprietary or confidential treatment of \nconfidential information by the person to whom such information is \ndisclosed prior to any such disclosure. \n \n16.4 \nTO Tariff Supersedes Existing Tariffs. This TO Tariff, together with the ISO \nTariff and wholesale distribution access tariff if any, supersedes any pre- \nexisting open access transmission tariff of the Participating TO. \n \n16.5 \nTitles. The captions and headings in this TO Tariff are inserted solely to \nfacilitate reference and shall have no bearing upon the interpretation of any \nof the rates, terms, and conditions of this TO Tariff. \n \n16.6 \nSeverability. If any term, covenant, or condition of this TO Tariff or the \napplication or effect of any such term, covenant, or condition is held invalid as \nto any person, entity, or circumstance, or is determined to be unjust, \nunreasonable, unlawful, imprudent, or otherwise not in the public interest, by \nany court or government agency of competent jurisdiction, then such term, \ncovenant, or condition shall remain in force and effect to the maximum extent \npermitted by law, and all other terms, covenants, and conditions of this TO \nTariff and their application shall not be affected thereby but shall remain in \nforce and effect. The Participating TO and Market Participants shall be \nrelieved of their obligations only to the extent necessary to eliminate such \nregulatory or other determination, unless a court or governmental agency of \ncompetent jurisdiction holds that such provisions are not severable from all \nother provisions of this TO Tariff. \n \n16.7 \nPreservation of Obligations. Upon termination of this TO Tariff, all \nunsatisfied obligations of any entity shall be preserved until satisfied. \n \n16.8 \nGoverning Law. This TO Tariff shall be interpreted, governed by, and construed \nunder the laws of the State of California, without regard to the principles of \nconflict of laws thereof, or the laws of the United States, as applicable, as if \nexecuted and to be performed wholly within the State of California. \n \n16.9 \nAppendices Incorporated. The several appendices to this TO Tariff, as may be \nrevised from time to time, are attached to this TO Tariff and are incorporated by \nreference as if fully set forth herein. \n16.10 \nConflict With ISO Tariff. If a Market Participant identifies a conflict between"},{"page":254,"startToken":94143,"endToken":94311,"text":"the TO Tariff and the ISO Tariff, the Participating TO and the Market \nParticipant shall make good-faith efforts to resolve the conflict. If the \nParticipating TO and Market Participant are unable to informally resolve that \nconflict, the Participating TO and Market Participant may use the ISO ADR \nProcedures to resolve it as set forth in Section 14 of this Tariff. \n \n16.11 \nConflicting Operating Instructions. In the event a Market Participant \nreceives conflicting operating instructions from the ISO and one or more \nParticipating TO(s), if human safety would not knowingly be neither \njeopardized nor electric facilities subject to damage while the Market \nParticipant seeks to reconcile the conflict with the appropriate ISO and \nParticipating TO employees before acting, the Market Participant should \nattempt a reconciliation. Otherwise, the Market Participant shall adhere to ISO \nTariff Section 4.2 and follow the ISO’s instructions. In no event shall a Market \nParticipant be required to follow operating instructions from the ISO if \nfollowing those instructions would knowingly jeopardize human safety."},{"page":255,"startToken":94311,"endToken":94441,"text":"Projected ATRR\nFor the 12 months ended\n12/31/__\nFormula Rate Index\nDesertLink, LLC\nTable of Contents\nFormula Rate Template\nAttachments:\nAttachment No\nWorksheet Name\n1\nProject Revenue Requirement Worksheet\n1a\nProject Plant Detail Worksheet\n2\nIncentive Return\n3\nFormula Rate True-Up\n4\nRate Base Worksheet\n5\nReturn on Rate Base Worksheet\n6\nInterest on True-Up\n6A\nTrue-Up Interest Rate Calculator\n7\nWeighted Average Federal and State Income Tax Rates\n8\nCost of Debt Prior to Issuing Non-Construction Financing\n9\nTrue-Up - Construction Financing Cost of Debt\n10\nDepreciation Rates\n11\nPrior Period Adjustments\n12\nRevenue Credit Detail\n13\nExcess or Deficient Accumulated Deferred Income Taxes - Summary\n13.1\nRegulatory Assets/Liabilities for Deficient/Excess ADIT - Averaging and Proration Adjustments \n13.2\nRe-measurement of ADIT and Tax-related Regulatory Assets and Liabilities"},{"page":256,"startToken":94441,"endToken":94595,"text":"Formula Rate - Non-Levelized\nPage 1 of 5\nRate Formula Template\nUtilizing FERC Form 1 Data\nDesertLink, LLC\nProjected ATRR\nFor the 12 months ended\n12/31/__\n(1)\n(2)\n(3)\n(4)\n(5)\nLine\nAllocated \nNo.\nSource\nAmount\n1\nGROSS REVENUE REQUIREMENT, without incentives\n(Page 3, Line 49)\n $                               -   \nREVENUE CREDITS\n(Note A)\nTotal\nAllocator (W)\n2\nAccount No. 454\n(Page 4, Line 20)\n                                                  -   \nTP\n         1.0000 \n $                               -   \n3\nAccount No. 456.1\n(Page 4, Line 21)\n                                                  -   \nTP\n         1.0000 \n $                               -   \n4\nRevenues from Grandfathered Interzonal Transactions\n(Note B)\n                                                  -   \nTP\n         1.0000 \n $                               -   \n5\nRevenues from service provided by the ISO at a discount\n                                                  -   \nTP\n         1.0000 \n $                               -   \n6\nTOTAL REVENUE CREDITS\n(Sum of Lines 2 through 5)\n                                                  -   \n $                               -   \n7\nPrior Period Adjustments\nAttachment 11, Line 18, Col. B\n                                                  -   \nDA\n         1.0000 \n $                               -   \n8\nTrue-up Adjustment with Interest\nAttachment 3, Line 9, Col. J\n                                                  -   \nDA\n         1.0000 \n $                               -   \n9\nNET ANNUAL TRANSMISSION REVENUE REQUIREMENT\n(Line 1 less Line 6 plus Lines 7 and 8)\n $                               -"},{"page":257,"startToken":94595,"endToken":95075,"text":"Page 2 of 5\nRate Formula Template\nUtilizing FERC Form 1 Data\nDesertLink, LLC\nFor the 12 months ended\n12/31/__\nLine\n(1)\n(2)\n(3)\n(4)\n(5)\nNo.\nRATE BASE: (Note R)\nSource\nCompany Total\nAllocator (W)\nTransmission\nGROSS PLANT IN SERVICE\nNote C\n(Col 3 times Col 4)\n1\nProduction\n205.46.g for end of year, records for other months\n                                                  -   \nN/A\n                 -   \n                                  -   \n2\nTransmission\nAttachment 4, Line 14, Col. (b)\n                                                  -   \nTP\n         1.0000 \n                                  -   \n3\nDistribution\n207.75.g for end of year, records for other months\n                                                  -   \nN/A\n                 -   \n                                  -   \n4\nGeneral & Intangible\nAttachment 4, Line 14, Col. (c)\n                                                  -   \nWS\n         1.0000 \n                                  -   \n5\nTOTAL GROSS PLANT\n(Sum of Lines 1 through 4)\n                                                  -   \nGP=\n         1.0000 \n                                  -   \n6\nACCUMULATED DEPRECIATION\nNote C\n7\nProduction\n219.20-24.c for end of year, records for other months\n                                                  -   \nN/A\n                 -   \n                                  -   \n8\nTransmission\nAttachment 4, Line 14, Col. (h)\n                                                  -   \nTP\n         1.0000 \n                                  -   \n9\nDistribution\n219.26.c for end of year, records for other months\n                                                  -   \nN/A\n                 -   \n                                  -   \n10\nGeneral & Intangible\nAttachment 4, Line 14, Col. (i)\n                                                  -   \nWS\n         1.0000 \n                                  -   \n11\nTOTAL ACCUM. DEPRECIATION\n(Sum of Lines 7 through 10)\n                                                  -   \n                                  -   \n12\nNET PLANT IN SERVICE\n13\nProduction\n(Line 1 - Line 7)\n                                              -   \n                               -   \n14\nTransmission\n(Line 2 - Line 8)\n                                              -   \n                               -   \n15\nDistribution\n(Line 3 - Line 9)\n                                              -   \n                               -   \n16\nGeneral & Intangible\n(Line 4 - Line 10)\n                                              -   \n                               -   \n17\nTOTAL NET PLANT\n( Sum of Lines 13 through 16)\n                                              -   \nNP=\n         1.0000 \n                               -   \n18\nADJUSTMENTS TO RATE BASE\n19\nAccount No. 281 (enter negative)\nAttachment 4, Line 28, Col. (d) (Note D)\n                                              -   \nN/A\n                 -   \n                               -   \n20\nAccount No. 282 (enter negative)\nAttachment 4, Line 28, Col. (e) (Note D)\n                                              -   \nNP\n         1.0000 \n                               -   \n21\nAccount No. 283 (enter negative)\nAttachment 4, Line 28, Col. (f) (Note D)\n                                              -   \nNP\n         1.0000 \n                               -   \n22\nAccount No. 190\nAttachment 4, Line 28, Col. (g) (Note D)\n                                              -   \nNP\n         1.0000 \n                               -   \n22a\nDeficient or (Excess) Accumulated Deferred Income Taxes\nAttachment 13, Line 7 (Note X)\n                                                  -   \nNP\n         1.0000 \n                               -   \n23\nAccount No. 255 (enter negative)\nAttachment 4, Line 28, Col. (h) (Note D)\n                                              -   \nNP\n         1.0000 \n                               -   \n24\nUnfunded Reserves (enter negative)\nAttachment 4, Line 43, Col. (h)\n                                              -   \nDA\n         1.0000 \n                               -   \n25\nCWIP\nAttachment 4, Line 14, Col. (d)\n                                              -   \nDA\n         1.0000 \n                               -   \n26\nUnamortized Regulatory Asset\nAttachment 4, Line 28, Col. (b) (Note E)\n                                              -   \nDA\n         1.0000 \n                               -   \n27\nUnamortized Abandoned Plant\nAttachment 4, Line 28, Col. (c) (Note F)\n                                              -   \nDA\n         1.0000 \n                               -   \n28\nTOTAL ADJUSTMENTS\n( Sum of Lines 19 through 27)\n                                              -   \n                                  -   \n29\nLAND HELD FOR FUTURE USE\nAttachment 4, Line 14, Col. (e) (Note G)\n                                              -   \nTP\n         1.0000 \n                               -   \n30\nWORKING CAPITAL\nNote H\n31\nCash Working Capital\n1/8*(Page 3, Line 17 minus Page 3, Line 14)\n                                              -   \n                               -   \n32\nMaterials & Supplies\nAttachment 4, Line 14, Col. (f)\n                                              -   \nTP\n         1.0000 \n                               -   \n33\nPrepayments (Account 165)\nAttachment 4, Line 14, Col. (g)\n                                              -   \nGP\n         1.0000 \n                               -   \n34\nTOTAL WORKING CAPITAL\n( Sum of Lines 31 through 33)\n                                              -   \n                                  -   \n35\nRATE BASE\n( Sum of Lines 17, 28, 29, and 34)\n                                              -   \n                                  -   \nFormula Rate - Non-Levelized"},{"page":258,"startToken":95075,"endToken":95604,"text":"Page 3 of 5\nRate Formula Template\nUtilizing FERC Form 1 Data\nDesertLink, LLC\nFor the 12 months ended\n12/31/__\nLine\n(1)\n(2)\n(3)\n(4)\n(5)\nNo.\nSource\nCompany Total\nAllocator (W)\nTransmission\nO&M\n(Col 3 times Col 4)\n1\nTransmission\n321.112.b\n                                                  -   \nTP\n         1.0000 \n                                  -   \n2\nLess Account 566 (Misc Trans Expense)\n321.97.b\n                                                  -   \nTP\n         1.0000 \n                                  -   \n3\nLess Account 565\n321.96.b\n                                                  -   \nTP\n         1.0000 \n                                  -   \n4\nA&G\n323.197.b\n                                                  -   \nWS\n         1.0000 \n                                  -   \n5\nLess FERC Annual Fees\n351.h (Note I)\n                                                  -   \nWS\n         1.0000 \n                                  -   \n6\nLess EPRI Dues\nNote J\n                                                  -   \nWS\n         1.0000 \n                                  -   \n7\nLess Reg. Commission Expense Account 928\nNote J\n                                                  -   \nWS\n         1.0000 \n                                  -   \n8\nLess: Non-safety Advertising account 930.1\nNote J\n                                                  -   \nWS\n         1.0000 \n                                  -   \n9\n10\nPlus Transmission Related Reg. Comm. Exp.\nNote K\n                                                  -   \nTP\n         1.0000 \n                                  -   \n11\n12\nPlus Transmission Lease Payments in Acct 565\nNote V\n                                                  -   \nDA\n         1.0000 \n                                  -   \n13\nAccount 566\n14\nAmortization of Regulatory Asset\nNote E\n                                                  -   \nDA\n         1.0000 \n                                  -   \n15\nMisc. Transmission Expense (less amort. of regulatory asset)\n321.97.b less line 14\n                                                  -   \nTP\n         1.0000 \n                                  -   \n16\nTotal Account 566\n(Sum of Lines 14 through 15) Ties to 321.97b\n                                                  -   \n                                  -   \n17\nTOTAL O&M\n                                                  -   \n                                  -   \n18\nDEPRECIATION EXPENSE\nNote C\n19\nTransmission\n336.7.b&d\n                                                  -   \nTP\n         1.0000 \n                                  -   \n20\nGeneral & Intangible\n336.10.b&d, 336.1.b&d\n                                                  -   \nWS\n         1.0000 \n                                  -   \n21\nAmortization of Abandoned Plant\nNote F\n                                                  -   \nDA\n         1.0000 \n                                  -   \n22\nTOTAL DEPRECIATION\n(Sum of Lines 19 through 21)\n                                                  -   \n                                  -   \n23\nTAXES OTHER THAN INCOME TAXES   (Note M)\n24\nLABOR RELATED\n25\nPayroll\n263.i\n                                                  -   \nWS\n         1.0000 \n                                  -   \n26\n263.i\n                                                  -   \nWS\n         1.0000 \n                                  -   \n27\nPLANT RELATED\n28\nProperty\n263.i\n                                                  -   \nGP\n         1.0000 \n                                  -   \n29\nGross Receipts\n263.i\n                                                  -   \nN/A\n         \n                                  -   \n30\nOther\n263.i\n                                                  -   \nGP\n         1.0000 \n                                  -   \n31\nPayments in lieu of taxes\n263.i\n                                                  -   \nGP\n         1.0000 \n                                  -   \n32\nTOTAL OTHER TAXES\n( Sum of Lines 25 through 31)\n                                                  -   \n                                  -   \n33\nINCOME TAXES    (Note N)\nNote N\n34\nT=1 - {[(1 - SIT) * (1 - FIT)] / (1 - SIT * FIT * p)}\n0.00%\n35\nCIT=(T/1-T) * (1-(WCLTD/R)) =\nWCLTD = Page 4, Line 15, R = Page 4, Line 18\n0.00%\n36\nFIT & SIT & P\n37\n38\n1 / (1 - T)  = (from line 35)\n1 / (1 - T), T from Line 35\n                                         1.0000 \n39\nAmortized Investment Tax Credit\n266.8f (enter negative) (Note D)\n                                                  -   \n40\nDeficient or (Excess) Deferred Income Taxes\nAttachment 13, Line 12, Col. (d) (Note X)\n                                                  -   \n41\nTax Effect of Permanent Differences\nNote O\n                                                  -   \n42\nIncome Tax Calculation\n(Line 35 times Line 48)\n                                                  -   \nN/A\n                                  -   \n43\nITC adjustment\n(Line 38 times Line 39)\n                                                  -   \nNP\n         1.0000 \n                                  -   \n44\nDeficient or (Excess) Deferred Income Tax Adjustment\nAttachment 13, Line 12, Col. (f) (Note X)\n                                                  -   \nNP\n         1.0000 \n                                  -   \n45\nPermanent Differences Tax Adjustment\n(Line 38 times Line 41)\n                                                  -   \nNP\n         1.0000 \n                                  -   \n46\nTotal Income Taxes\n(Sum of Lines 42 through 45)\n                                                  -   \n                                  -   \n47\nRETURN\n48\nRate Base times Return\n(Page 2, Line 35 times Page 4, Line 18)\n                                                  -   \nN/A\n                 -   \n                                  -   \n49\nGROSS REVENUE REQUIREMENT\n( Sum of Lines  17, 22, 32, 46, and 48)\n                                                  -   \n                                  -   \n(Sum of Lines 1, 4, 10, 12, and 16 less Sum of Lines 2, 3, and 5 \nthrough 8)\nHighway and vehicle"},{"page":259,"startToken":95604,"endToken":95874,"text":"Formula Rate - Non-Levelized\nPage 4 of 5\nRate Formula Template\nUtilizing FERC Form 1 Data\nDesertLink, LLC\nFor the 12 months ended\n12/31/__\nLine\n(1)\n(2)\n(3)\n(4)\n(5)\nNo.\nSUPPORTING CALCULATIONS AND NOTES\nTRANSMISSION PLANT INCLUDED IN ISO RATES\n1\nTotal Transmission plant\n(Page 2, Line 2, Col. 3)\n                                  -   \n2\n(Note P)\n                                  -   \n3\n(Note S)\n                                  -   \n4\nTransmission plant included in ISO rates\n(Line 1 minus Lines 2 and 3)\n                                  -   \n5\nPercentage of Transmission plant included in ISO Rates\n(Line 4 divided by Line 1)\nTP =                               1.00 \n6\nWAGES & SALARY ALLOCATOR (W&S)\nForm 1 Reference\n$\nTP\nAllocation\n7\nProduction\n354.20.b\n                                                  -   \n            -                    -   \n8\nTransmission\n354.21.b\n                                                  -   \n        1.00                  -   \n9\nDistribution\n354.23.b\n                                                  -   \n            -                    -   \nW&S Allocator\n10\nOther\n354.24,25,26.b\n                                                  -   \n            -                    -   \n($ / Allocation)\n11\nTotal (W&S Allocator is 1 if lines 7-10 are zero)\n(Sum of Lines 7 through 10)\n                                                  -   \n                 -   \n=\n                        1.00000  = WS\n12\nRETURN (R)\n13\n14\n$\n%\nCost\nWeighted\n15\nLong Term Debt\nAttachment 5, Line 8 (Notes Q & R)\n                                                  -   \n50.0%\n0.00%\n0.00% = WCLTD\n16\nPreferred Stock (112.3.c)\nAttachment 5, Line 9 (Notes Q & R)\n                                                  -   \n0.0%\n0.00%\n0.00%\n17\nCommon Stock\nAttachment 5, Line 10 (Notes Q, R, and T)\n                                                  -   \n50.0%\n9.80%\n4.90%\n18\nTotal\n( Sum of Lines 15 through 17)\n                                                  -   \n4.90% = R\n19\nREVENUE CREDITS\n$\n20\nAttachment 12, Line 8, Col. C (Note U)\n                                  -   \n21\nACCOUNT 456.1 (OTHER ELECTRIC REVENUES)\nAttachment 12, Line 18, Col. C (Note A)\n                                  -   \nLess Transmission plant excluded from ISO rates\nLess Transmission plant included in OATT Ancillary Service \nrates\nACCOUNT 454 (RENT FROM ELECTRIC"},{"page":260,"startToken":95874,"endToken":97449,"text":"Formula Rate - Non-Levelized\nPage 5 of 5\nRate Formula Template\nUtilizing FERC Form 1 Data\nDesertLink, LLC\nFor the 12 months ended\n12/31/__\nGeneral Note: References to pages in this formula rate template are indicated as: (Page #, Line #, Col. #)\nReferences to data from FERC Form 1 are indicated as: #.y.x (page, line, column)\nNotes\nA\nB\nCompany will not have any grandfathered agreements. Therefore, this line shall remain zero.\nC\nPlant In Service, Accumulated Depreciation, and Depreciation Expenses shall exclude Asset Retirement Obligation amounts.\nD\nE\nF\nUnamortized Abandoned Plant and Amortization of Abandoned Plant will be zero until the Commission accepts or approves recovery of the cost of Abandoned Plant. Utility must submit a Section 205 filing to recover the cost of abandoned plant.\nG\nIdentified in FERC Form 1, or Company records if not so indicated on the FERC Form 1, as being transmission related.\nH\nI\nJ\nPage 3, Line 6 - Subtract all EPRI Annual Membership Dues listed in Form 1 at 353.f, all Regulatory Commission Expenses in account 928 itemized at 351.h, and non-safety related advertising included in Account 930.1.\nK\nPage 3, Line 8-Add back Regulatory Commission Expenses directly related to transmission service, ISO filings, or transmission siting itemized at 351.h.\nM\nN\nInputs Required:\nFIT = \n0.0%\n(Weighted Average Federal Income Tax Rate (Attachment 7, line 4, col. (i))\nSIT = \n0.0%\n(Weighted Average State Income Tax Rate (Attachment 7, line 8, col. (i))\np = \n0.0%\n(Percent of federal income tax deductible for state purposes)\nO\nP\nRemoves transmission plant determined by Commission order to be state-jurisdictional according to the seven-factor test (until Form 1 balances are adjusted to reflect application of seven-factor test).\nQ\nR\nS\nT\nThe rate of return on common equity (\"ROE\") will be supported in the original Section 205 filing and shall, at no time during the life of the Project, be higher than 9.8%, including adders.  No change in ROE may be made absent a filing with FERC.\nU\nIncludes only income related to transmission facilities, such as pole attachments, rentals and special use from general ledger.\nV\nAdd back any lease expense of transmission assets used to provide service under this tariff included in account 565. Amount to be obtained from company books and records.\nW\nDA = Direct Assignment; GP = Gross Plant Allocator (page 2, line 5); N/A = Not Applicable; NP = Net Plant Allocator (page 2, line 17); TP = Transmission Plant Allocator (page 4, line 5); WS = Wage and Salary Allocator (page 4, line 11).\nX\nThe revenues credited on page 1, lines 2-6, shall include only the amounts received by DesertLink for service rendered using facilities for which recovery is provided under this tariff. They do not include revenues associated with FERC annual charges, gross \nreceipts taxes, or facilities not included in this template (e.g., direct assignment facilities and GSUs) which are not recovered under this Rate Formula Template.\nAccumulated deferred income tax amounts associated with asset or liability accounts excluded from rate base (such as ADIT related to asset retirement obligations and certain tax-related regulatory assets or liabilities) do not affect rate base.  Balance of Account \n255 will be reduced by prior flow throughs and excluded if the utility chooses to utilize amortization of tax credits against taxable income. Account 281 is not allocated to Transmission.\nRecovery of Regulatory Asset permitted only for pre-commercial and formation expenses as authorized by the Commission. Recovery of any other regulatory assets requires authorization from the Commission. A carrying charge equal to the AFUDC rate will \nbe applied to the Regulatory Asset prior to the rate year when costs are first recovered.\nCash Working Capital assigned to transmission is one-eighth of O&M allocated to transmission at page 3, line 17, column 5 minus amortization of Regulatory Asset at page 3, line 14, column 5.  Prepayments are the electric related prepayments booked to \nAccount No. 165 and reported on page 111, line 57 in the Form 1.\nThe FERC's annual charges for the year assessed the Transmission Owner for service under this tariff.  To the extent the charges are separately identified on the FERC Form 1, page 350, column 1, the line number will be added to the source in Column 2 for \nreference.  Line item references can change from year to year.  Items not specifically identified in the FERC Form 1, page 350 will be obtained from Company books and records.\nIncludes only FICA, unemployment, highway, property, gross receipts, and other assessments charged in the current year.  Taxes related to income are excluded.  Enter the line number on page 262-63 upon which each item is identified.  To the extent individual \ntypes of taxes are separately identified on the FERC Form 1, page 262, column a, the line number will be added to the source in Column 2 for reference.  Line item references can change from year to year.  Items not specifically identified in the FERC Form 1, \npage 262-63 will be obtained from Company books and records.\nFIT is the weighted average Federal income tax rate and SIT is the weighted average State income tax rate, both from Attachment 7, and p is the \"the percentage of federal income tax deductible for state income taxes\". A utility that elected to utilize amortization \nof tax credits against taxable income, rather than book tax credits to Account No. 255 and reduce rate base, must reduce its income tax expense by the amount of the Amortized Investment Tax Credit (Form 1, 266.8.f) multiplied by (1/1-T) (page 3, line 26).  \nExcess Deferred Income Taxes reduce income tax expense by the amount of the expense multiplied by (1/(1-T)).\nThe Tax Effect of Permanent Differences captures the differences in the income taxes due under the Federal and State calculations and the income taxes calculated in Appendix III that are not the result of a timing difference. Tax Effect equals Permanent \nDifferences multiplied by T.\nThe cost of debt will be determined based on the financing in place during each stage of project development. Before debt is obtained, a proxy interest rate which will be supported in the original Section 205 filing will be used. This rate is provided on \nAttachment 8 line 36. If construction debt (wherein principal is drawn down over time) is issued, the rate plus an amortization of fees projected to be incurred on the construction debt during the rate year will be the cost of debt. This construction debt rate \n(inclusive of fees) will be reset and trued-up every year using the method on Attachment 9 for multi-year construction projects. Once non-construction debt is obtained, the actual interest rate and fees on the debt in place at the end of the year such non-\nconstruction debt is obtained will become the cost of debt. In the first full year after non-construction debt is obtained, the cost of debt will be the actual cost of debt determined using the method on Attachment 5. \nA h\nh i\nl\ni l\nf 50% E\ni\nd 50% d b\nill b\nd\nil h fi\ni i\ni\nl\nd i\ni\nil\nh\ni\nh\ni\nd b\nh C\ni i\nAf\nh f\nili i\nl\nd i\ni\nh l\nf\n50%\ni\nh\nh i\nl\nCalculate rate base using 13 month average balance, except ADIT.  The calculation of ADIT in the annual true-up calculation will use the beginning-of-year and end-of-year balances, and will be performed in accordance with IRS regulation Section 1.167(l)-\n1(h)(6).  The calculation of ADIT in the annual projection will be performed in accordance with IRS Regulation Section 1.167(l)-1(h)(6). \nRemoves dollar amount of transmission plant to be included in the development of OATT ancillary services rates and generation step-up facilities, which are deemed to be included in OATT ancillary services. For these purposes, generation step-up facilities are \nthose facilities at a generator substation on which there is no through-flow when the generator is shut down.\nUpon enactment of changes in tax law, ADIT balances are re-measured and adjusted in the Company’s books of account, resulting in excess or deficient accumulated deferred income tax assets and liabilities.  Excess or deficient ADIT attributable to timing \ndifferences between the amounts of expenses or revenues recognized for income tax purposes and amounts of expenses or revenues recognized for ratemaking purposes as well as subsequent recoverable or refundable amortization of such amounts will be based \nupon Company records and be calculated and recorded in accordance with ASC 740 and any applicable normalization requirements of the taxing jurisdiction.  The Deficient or (Excess) Deferred Income Tax Adjustment (page 3, line 44) is computed by \nmultiplying each component of Deficient or (Excess) Deferred Income Taxes (page 3, line 40) by the applicable tax gross-up factor.  For each re-measurement of ADIT, the amounts entered as the Deficient or (Excess) Accumulated Deferred Income Taxes \ncomponent of ADJUSTMENTS TO RATE BASE (page 2, line 22a) or as the Deficient or (Excess) Deferred Income Tax Adjustment component of INCOME TAXES (page 3, line 44) will be supported by Attachment 13 (Deficient or Excess Accumulated \nDeferred Income Taxes) providing the balance for each taxing jurisdiction at the beginning and end of the year, amortization for the year, calculation of the gross-up to the revenue requirement level and any other information required to support compliance with \nany applicable normalization requirements."},{"page":261,"startToken":97449,"endToken":97781,"text":"Page 1 of 3\nFor the twelve months ended 12/31/__\nAttachment 1\nProject Revenue Requirement Worksheet\nDesertLink, LLC\nTo be completed in conjunction with Appendix III.\nLine\n(1)\n(2)\n(3)\n(4)\nNo.\nAppendix III, Page, Line, Col.\nTransmission\nAllocator\n1\nGross Transmission Plant plus CWIP\nAppendix III, p 2, line 2, col 5 plus line 25, col 5 (Note A)\n                                                         -   \n2\nNet Transmission Plant plus CWIP and Abandoned Plant\nAppendix III, p 2, line 14, col 5 plus line 25 & 27, col 5 (Note B)\n                                                         -   \nO&M EXPENSE\n3\nTotal O&M Allocated to Transmission\nAppendix III, p 3, line 17, col 5\n                                                         -   \n4\nAnnual Allocation Factor for O&M\n(line 3 divided by line 1, col 3)\n0.00%\n0.00%\nGENERAL AND INTANGIBLE (G&I) DEPRECIATION EXPENSE\n5\nTotal G&I Depreciation Expense\nAppendix III, p 3, line 20, col 5 (Note C)\n                                                         -   \n6\nAnnual Allocation Factor for G&I Depreciation Expense\n(line 5 divided by line 1, col 3)\n0.00%\n0.00%\nTAXES OTHER THAN INCOME TAXES\n7\nTotal Other Taxes\nAppendix III, p 3, line 32, col 5\n                                                         -   \n8\nAnnual Allocation Factor for Other Taxes\n(line 7 divided by line 1, col 3)\n0.00%\n0.00%\n9\nLess Revenue Credits\nAppendix III, p 1, line 6 col 5\n                                                         -   \n10\nAnnual Allocation Factor for Revenue Credits\n(line 9 divided by line 1, col 3)\n0.00%\n0.00%\n11\nAnnual Allocation Factor for Expense\nSum of lines 4, 6, 8, and 10\n0.00%\nINCOME TAXES \n12\nTotal Income Taxes\nAppendix III, p 3, line 46, col 5\n                                                         -   \n13\nAnnual Allocation Factor for Income Taxes\n(line 12 divided by line 2, col 3)\n0.00%\n0.00%\nRETURN\n14\nReturn on Rate Base\nAppendix III, p 3, line 48, col 5\n                                                         -   \n15\nAnnual Allocation Factor for Return on Rate Base\n(line 14 divided by line 2, col 3)\n0.00%\n0.00%\n16\nAnnual Allocation Factor for Return\nSum of lines 13 and 15\n0.00%"},{"page":262,"startToken":97781,"endToken":97982,"text":"Page 2 of 3\nFor the twelve months ended 12/31/__\nAttachment 1\nProject Revenue Requirement Worksheet\nDesertLink, LLC\nAny hypothetical amounts or project names in a filed template will be removed and replaced with actual amounts in the first year actual values are available without the need for a section 205 filing to modify the template.\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\nProject Name\nCAISO Category\nIdentifier\nProject Gross Plant\nProject Net Plant\nAnnual Return Charge\n(Note D)\n(Page 1, line 11)\n(Col. 3 * Col. 4)\n(Note E)\n(Page 1, line 16)\n(Col. 6 * Col. 7)\n1a\nProject A\nAAAA\n                                                  -   \n0.00%\n                       -    $                                                      -   \n0.00%\n                                         -   \n1b\nProject B\nBBBB\n                                                  -   \n0.00%\n                       -    $                                                      -   \n0.00%\n                                         -   \n2\nTotal Schedule 12\n                                                  -   \n                       -    $                                                      -   \n                                         -   \n3a\nProject C\nCCCC\n                                                  -   \n0.00%\n                       -    $                                                      -   \n0.00%\n                                         -   \n3b\nProject D\nDDDD\n                                                  -   \n0.00%\n                       -    $                                                      -   \n0.00%\n                                         -   \n4\nTotal Zonal\n                                                  -   \n                       -    $                                                      -   \n                                         -   \n5\nOther\n                                                  -   \n0.00%\n                       -    $                                                      -   \n0.00%\n                                         -   \n6\nAnnual Totals\n                                                  -   \n                       -    $                                                      -   \n                                         -   \nThis worksheet is used to compute project specific revenue requirements for any projects for which such calculation is required by CAISO. Other projects which comprise the remaining revenue requirement on Appendix III will \nnot be entered on this schedule.\nLine \nNo.\nAnnual Allocation \nFactor for Expense\nAnnual \nExpense \nCharge\nAnnual \nAllocation \nFactor for \nReturn"},{"page":263,"startToken":97982,"endToken":98428,"text":"Page 3 of 3\nFor the twelve months ended 12/31/__\nAttachment 1\nProject Revenue Requirement Worksheet\nDesertLink, LLC\n(9)\n(10)\n(11)\n(12)\n(12a)\n(13)\n(14)\n(15)\n(16)\nIncentive Return\nCeiling Rate\n(Note F)\n(Sum Col. 5, 8 & 9)\n(Note G)\n(Sum Col. 10 & 12)\n(Note H)\n(Sum Col. 10 & 12 Less Col. 13)\n(Note I)\n(Sum Col. 14 & 15)\n1a\n                                         -                              -   \n                              -                                               -   \n                             -                          -                                                            -                          -                                            -   \n1b\n                                         -                              -   \n                              -                                               -   \n                             -                          -                                                            -                          -                                            -   \n2\n                                         -                                 -   \n                                                  -                                -                          -                                                            -                          -                                            -   \n3a\n                                         -                              -   \n                              -                                               -   \n                             -                          -                                                            -                          -                                            -   \n3b\n                                         -                              -   \n                              -                                               -   \n                             -                          -                                                            -                          -                                            -   \n4\n                                         -                                 -   \n                                                  -                                -                          -                                                            -                          -                                            -   \n5\n                                         -                              -   \n                              -                                               -   \n                             -                          -                                                            -                          -                                            -   \n6\n                                         -                                 -   \n                                                  -                                -                          -                                                            -                          -                                            -   \nNotes\nA\nGross Transmission Plant is that identified on page 2 line 2 of Appendix III inclusive of any CWIP or unamortized abandoned plant included in rate base when authorized by FERC order.\nB\nNet Plant is that identified on page 2 line 14 of Appendix III inclusive of any CWIP or unamortized Abandoned Plant included in rate base when authorized by FERC order less any prefunded AFUDC, if applicable.\nC\nD\nE\nF\nG\nRequires approval by FERC of incentive return applicable to the specified project(s).\nH\nI\nTrue-Up Adjustment is calculated on the Project True-up Schedule for the relevant true-up year.\nLine \nNo.\nProject \nDepreciation/Amortizatio\nn Expense\nAnnual Revenue \nRequirement\nIncentive Return in \nBasis Points\nCompetitive \nConcession\nTotal Annual Revenue \nRequirement\nTrue-Up \nAdjustment\nNet Revenue \nRequirement\n(Attachment 2, Line 28 Incentive \nReturn * Col. 6 * Col. 11/100)\nGeneral and Intangible Depreciation and Amortization Expense includes all expenses (except depreciation and armortization of G&I Asset Retirement Obligations) not directly associated with a project, which is entered on page 3 , \ncolumn 9.\nProject Gross Plant is the total capital investment including CWIP for the project calculated from Company books and records in the same method as the gross plant value in line 1.  This value includes subsequent capital \ninvestments required to maintain the facilities to their original capabilities.  Refer to Attachment 1a for detail.\nProject Net Plant is the Project Gross Plant Identified in Column 3 less the associated Accumulated Depreciation plus CWIP in rate base if applicable and Unamortized Abandoned Plant.  Refer to Attachment 1a for detail.\nProject Depreciation Expense is the actual value booked for the project (excluding General and Intangible depreciation) at Appendix III, page 3, line 19, plus amortization of Abandoned Plant at Appendix III, page 3, line 21.  For \neach project on Attachment 1a, Depreciation Expense is Attachment 1a, Line 2, Column (15) minus Column (3), and Amortization of Abandoned Plant is the difference between Columns (3) and (15) on Attachment 1a, Line 4.\nThe Competitive Concession is the reduction in revenue, if any, that the company agreed to, for instance, to be selected to build facilities as the result of a competitive process and equals the amount by which the  annual revenue \nrequirement is reduced from the ceiling rate."},{"page":264,"startToken":98428,"endToken":98756,"text":"Att 1a - Project Plant Detail\n Page 10\nPage 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 1a\nProject Plant Detail Worksheet\nDesertLink, LLC\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\n(15)\nProject Name\n13-month average\n1a\nProject A\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n1b\nProject B\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n…\n…\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n1\nTotal Project Transmission Gross Plant\n                                                                -                                -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\n(15)\nProject Name\n13-month average\n2a\nProject A\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n2b\nProject B\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n…\n…\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n2\nTotal Project Transmission Accumulated Depreciation\n                                                                -                                -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\n(15)\nProject Name\n13-month average\n3a\nProject A\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n3b\nProject B\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n…\n…\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n3\nTotal Project CWIP\n                                                                -                                -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\n(15)\nProject Name\n13-month average\n4a\nProject A\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n4b\nProject B\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n…\n…\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n4\nTotal Project Unamortized Abandoned Plant\n                                                                -                                -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n(1)\n(2)\nProject Name\n5a\nProject A\n                                                                -   \n5b\nProject B\n                                                                -   \n…\n…\n … \n5\nTotal Project Transmission Net Plant\n                                                                -   Ties to Appendix III, p 2, line 14, col 5 plus line 25 & 27, col 5; Used on Attachment 1, Column (6) \nLine \nNo.\nProject\nTransmission \nGross Plant\n20__\nDecember\n20__\nJanuary\n20__\nFebruary\n20__\nMarch\n20__\nApril\n20__ \nMay\n20__ \nJune\n20__ \nJuly\n20__\nAugust\n20__\nSeptember\n20__\nOctober\n20__ \nNovember\n20__\nDecember\nLine \nNo.\nProject\nTransmission Accumulated \nDepreciation \n20__\nDecember\n20__\nJanuary\n20__\nFebruary\n20__\nMarch\n20__\nApril\n20__ \nMay\n20__ \nJune\n20__ \nJuly\n20__\nAugust\n20__\nSeptember\n20__\nOctober\n20__ \nNovember\n20__\nDecember\nLine \nNo.\nProject CWIP\n20__\nDecember\n20__\nJanuary\n20__\nFebruary\n20__\nMarch\n20__\nApril\n20__ \nMay\n20__ \nJune\n20__ \nJuly\n20__\nAugust\n20__\nSeptember\n20__\nOctober\n20__ \nNovember\n20__\nDecember\nLine \nNo.\nProject \nUnamortized Abandoned Plant\n20__\nDecember\n20__\nJanuary\n20__\nFebruary\n20__\nMarch\n20__\nApril\n20__ \nMay\n20__ \nJune\n20__ \nJuly\n20__\nAugust\n20__\nSeptember\n20__\nOctober\n20__ \nNovember\n20__\nDecember\nLine \nNo.\nProject\nTransmission \nNet Plant\n13-month average\n(Line 1 - Line 2 + Line 3 + Line 4)"},{"page":265,"startToken":98756,"endToken":99233,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 2\nIncentive Return\nDesertLink, LLC\nLine\n1\nRate Base\nAppendix III, Page 2, Line 35, Col.5\n                                                                         -   \n2\n100 Basis Point Incentive Return\n$\nCost\n$\n%\nWeighted\n3\nLong Term Debt\n(Notes Q & R from Appendix III) \n                            -   \n50.00%\n0.00%\n0.00%\n4\nPreferred Stock\n(Notes Q & R from Appendix III) \n                            -   \n0.00%\n0.00%\n0.00%\n5\nCommon Stock\n(Notes Q, R, & T from Appendix III)\n                            -   \n50.00%\n10.80%\n5.40%\n6\nTotal (sum lines 3-5)\n                            -   \n5.40%\n7\n100 Basis Point Incentive Return multiplied by Rate Base (line 1 * line 6)\n                                                                         -   \n8\nINCOME TAXES\n9\nT=1 - {[(1 - SIT) * (1 - FIT)] / (1 - SIT * FIT * p)} =\n0.00%\n10\nCIT=(T/1-T) * (1-(WCLTD/R)) =\n0.00%\n11\nWCLTD\nLine 3\n0.00%\n12\nFIT, SIT & p are as given in Appendix III footnote N.\n13\n1 / (1 - T)\nLine 9\n                    1.0000 \n14\nAmortized Investment Tax Credit (266.8f) (enter negative)\nAppendix III, Page 3, Line 39\n                            -   \n15\nDeficient or (Excess) Deferred Income Taxes\nAppendix III, Page 3, Line 40\n                            -   \n16\nTax Effect of Permanent Differences (Note B)\nAppendix III, Page 3, Line 41\n                            -   \n17\nIncome Tax Calculation\nLine 7 times Line 10\n                        -   \n18\nITC adjustment\nLine 13 times Line 14\n                            -   \nNP             1.00                         -   \n19\nDeficient or (Excess) Deferred Income Tax Adjustment\nAppendix III, Page 3, Line 44\n                            -   \nNP             1.00                         -   \n20\nPermanent Differences Tax Adjustment\nLine 13 times Line 16\n                            -   \nNP             1.00                         -   \n21\nTotal Income Taxes\nSum of Lines 17 through 20\n                            -   \n                        -                                                                            -   \n22\nReturn and Income Taxes with 100 basis point increase in ROE\n                                                                         -   \n23\nReturn\n(Appendix III, page 3, line 48, col 5)\n                                                                         -   \n24\nIncome Tax\n(Appendix III, page 3, line 46, col 5)\n                                                                         -   \n25\nReturn and Income Taxes without 100 basis point increase in ROE\nSum of Lines 23 and 24\n                                                                         -   \n26\nIncremental Return and Income Taxes for 100 basis point increase in ROE\nLine 22 less Line 25\n                                                                         -   \n27\nRate Base\nLine 1\n                                                                         -   \n28\nIncremental Return and Income Taxes for 100 basis point increase in ROE divided by Rate Base Line 26 divided by Line 27\n0.00%\nNotes\nA\nB\nThe Tax Effect of Permanent Differences captures the differences in the income taxes due under the Federal and State calculations and the income taxes calculated in Appendix III that are not the result of a timing difference.\nCost = Appendix III, Page 4, Line 17, \nplus 100 bp\nThe 100 basis point increase in ROE is used only to determine the increase in return and income taxes associated with a 100 basis point increase in ROE and does not reflect what incentives the Commission \nmay approve for a specific transmission project. The overall ROE inclusive of incentives is subject to the limitations noted in Appendix III, Note T.  Any ROE actual incentive must be approved by the \nCommission."},{"page":266,"startToken":99233,"endToken":99779,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 3\nFormula Rate True-Up\nDesertLink, LLC\nAny hypothetical amounts or project names in a filed template will be removed and replaced with actual amounts in the first year actual values are available without the need for a section 205 filing to modify the template.\nAnnual True-Up Calculation\nLine\n1\nTrue-Up Year\n2\nC\nD\n                             -   \nF\nG\nH\nI\nJ\nA\nB\nE\nProject Name\n3\nRemaining Appendix III\n0.0%\n                             -   \n                               -    $                          -   \n                             -   \n4a\nProject A\nAAAA\n                             -   \n0.0%\n                             -                                  -                                  -    $                          -                                -                                -   \n4b\nProject B\nBBBB\n                             -   \n0.0%\n                             -                                  -                                  -    $                          -                                -                                -   \n5\nTotal Schedule 12\n                             -   \n                             -                                  -                                  -    $                          -                                -                                -   \n6a\nProject C\nCCCC\n                             -   \n0.0%\n                             -                                  -                                  -    $                          -                                -                                -   \n6b\nProject D\nDDDD\n                             -   \n0.0%\n                             -                                  -                                  -    $                          -                                -                                -   \n7\nTotal Zonal\n                             -   \n                             -                                  -                                  -    $                          -                                -                                -   \n8\nOther\n                             -   \n0.0%\n                             -                                  -                                  -    $                          -                                -                                -   \n9\n                             -   \n0.0%\n                             -                                  -                                  -                                -                                -                                -   \n10\n $                          -   Total Interest on True-Up - Attachment 6\nPrior Period Adjustment\nA\nB\nSource\n11\nDescription of Adjustment\n                 -   \nNotes\n1)\nThe revenue received is the total amount of revenue distributed to company in the  year as shown on pages 328-330 of the Form No 1. The Revenue Received is input on line 2, Col. E.\n2)\nFrom the Attachment 1, lines 1a through 6, col. 16 from the template in which the true-up year revenue requirement was initially projected.\n3)\nFrom True-Up revenue requirement template Attachment 1, lines 1a through 6, col. 14.\n4)\n5)\nCorrections to true-ups for previous rate years including interest will be computed on Attachment 11 and entered on the appropriate line 3-8 above.\nThis Attachment 3 is used to calculate the annual formula rate true-up. Any projects for which the RTO requires a true-up on an individual project basis, as shown on Attachment 1, will be computed separately. The remainder of the \nrevenue requirement will also be trued up. The utility will individually enter the projected true-up year revenue requirements in Column C. A percentage of total will be calculated in Column D. Actual revenue received during the \ntrue-up year is entered into Column E, line 2 and allocated using the Column D percentage. The utility will prepare this formula rate template with the actual inputs for the true-up year, with the resulting revenue requirement for each \nline being separately entered in Column F.  In Col. G, Col. F is subtracted from Col. E to calculate the true-up adjustment. Interest on the true-up is computed in Column H. Any adjustments to prior period true-ups are entered in Col. \nI.  Col. J computes the total true-up as the sum of Col. G, H and I.\nProjected True-Up Year Revenue \nRequirement Calculation\nTrue-Up Year \nRevenue Received1\nActual True-Up \nYear Revenue Req.\nCAISO \nIdentification\nProject # Or \nOther \nIdentifier\nNet Revenue \nRequirement2\n% of Total \nRevenue  \nRequirement\nAllocation of \nRevenue Received     \n                                   \n                    (E, Line \n2) x (D)\nTrue-Up Net Revenue \nRequirement3\nNet Under/(Over) \nCollection   (F)-(E)\nTrue-Up Interest \nIncome (Expense)4 \n(D) x (H, line 10)\nPrior Period \nAdjustment with \nInterest5\nTotal True-Up        \n(G) + (H) + (I)\nTotal Annual Revenue \nRequirements\nPrior Period Adjustment \n(Note 5)\nAdjustment \nAmount\nAttachment \n11\nInterest due on the true up is calculated for the 24 month period from the start of the true-up year until the end of the year following the true-up year when the true up will be included in rates. Total True up Interest calculate on \nAttachment 6 and allocated to projects based on the percentage in Column D."},{"page":267,"startToken":99779,"endToken":100108,"text":"Page 1 of 2\nFor the twelve months ended 12/31/__\nAttachment 4\nRate Base Worksheet\nDesertLink, LLC\nGross Plant in Service\nCWIP\nLHFFU\nWorking Capital\nAccumulated Depreciation\nMonth\nTransmission\nCWIP in Rate Base\nHeld for Future Use\nMaterials & Supplies\nPrepayments\nTransmission\n(a)\n(b)\n(c) \n(d)\n(e) \n(f)\n(g)\n(h)\n(i)\n(Note A)\n1\nDecember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n2\nJanuary\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n3\nFebruary\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n4\nMarch\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n5\nApril\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n6\nMay\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n7\nJune\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n8\nJuly\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n9\nAugust\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n10\nSeptember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n11\nOctober\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n12\nNovember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n13\nDecember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n14\n                             -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \nAdjustments to Rate Base\nMonth\n(a)\n(b)\n(c) \n(d)\n(e) \n(f)\n(g)\n(h)\n(Note A)\nNote C\nNote D\n272.8.b & 273.8.k\n274.2.b & 275.2.k\n276.9.b & 277.9.k\n234.8.b & c\n15\nDecember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -   \n16\nJanuary\n                   -                                -                                -   \n                                 -   \n17\nFebruary\n                   -                                -                                -   \n                                 -   \n18\nMarch\n                   -                                -                                -   \n                                 -   \n19\nApril\n                   -                                -                                -   \n                                 -   \n20\nMay\n                   -                                -                                -   \n                                 -   \n21\nJune\n                   -                                -                                -   \n                                 -   \n22\nJuly\n                   -                                -                                -   \n                                 -   \n23\nAugust\n                   -                                -                                -   \n                                 -   \n24\nSeptember\n                   -                                -                                -   \n                                 -   \n25\nOctober\n                   -                                -                                -   \n                                 -   \n26\nNovember\n                   -                                -                                -   \n                                 -   \n27\nDecember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -   \n28\n                             -                                -                                  -                                       -                                      -                                      -                                    -   \nLine \nNo\nGeneral & \nIntangible\nGeneral & Intangible\n207.58.g less \n207.57.g for end of \nyear, records for \nother months\n205.5.g & 207.99.g \nless 207.98.g for \nend of year, records \nfor other months\nNote B - page 2, \ncolumn C\n214.47.d for end of \nyear, records for other \nmonths\n227.8.c & 227.16.c for \nend of year, records for \nother months\n111.57.c for end of \nyear, records for other \nmonths\n219.25.c less ARO for \nend of year, records \nfor other months\n219.28.c & 200.21.c \nless ARO for end of \nyear, records for other \nmonths\nAverage of the 13 \nMonthly Balances\nUnamortized \nRegulatory Asset\nUnamortized \nAbandoned Plant\nAccount No. 281 \nAccumulated \nDeferred Income \nTaxes (Note E)\nAccount No. 282 \nAccumulated Deferred \nIncome Taxes (Note E)\nAccount No. 283 \nAccumulated Deferred \nIncome Taxes (Note E)\nAccount No. 190 \nAccumulated \nDeferred Income \nTaxes (Note E)\nAccount No. 255 \nAccumulated \nDeferred Investment \nCredit (Note I)\nConsistent with \n266.8.b & 267.8.h\nAverage of the 13 \nMonthly Balances"},{"page":268,"startToken":100108,"endToken":100814,"text":"Page 2 of 2\nFor the twelve months ended 12/31/\nAttachment 4\nRate Base Worksheet\nDesertLink, LLC\nTotal CWIP\n(a)\n(b)\n(c) = (a) - (b)\nCompany records\n29\nDecember\n                   -                                -                                -                                  -   \n30\nJanuary\n                   -                                -                                -                                  -   \n31\nFebruary\n                   -                                -                                -                                  -   \n32\nMarch\n                   -                                -                                -                                  -   \n33\nApril\n                   -                                -                                -                                  -   \n34\nMay\n                   -                                -                                -                                  -   \n35\nJune\n                   -                                -                                -                                  -   \n36\nJuly\n                   -                                -                                -                                  -   \n37\nAugust\n                   -                                -                                -                                  -   \n38\nSeptember\n                   -                                -                                -                                  -   \n39\nOctober\n                   -                                -                                -                                  -   \n40\nNovember\n                   -                                -                                -                                  -   \n41\nDecember\n                   -                                -                                -                                  -   \n                             -                                -                                  -   \nUnfunded Reserves   (Notes A and F and G)\n(a)\n(b)\n(b.i)\n(b.ii)\n(c) \n(d)\n(e) \n(f)\n(g)\n(h)\nList of all reserves\nAmount\n42a\nReserve 1\n -\n -\n                               -   \n -\n -\n -\n                                 -                                    -   \n42b\nReserve 2\n -\n -\n                               -   \n -\n -\n -\n                                 -                                    -   \n43\nTotal\n                               -   \n                                 -   \nNotes:\nA\nCalculate using 13 month average balance, except ADIT which is calculated based on the average of the beginning of the year and the end of the year balances\nB\nC\nD\nRecovery of abandoned plant is limited to any abandoned plant recovery authorized by FERC.\nE\nADIT is computed using the average of the beginning of the year and the end of the year balances. Electric ADIT only, Excludes ARO-related ADIT.\nF\nG\nH\nI\nBalance of Account 255 will be reduced by prior flow throughs and excluded if the utility chooses to utilize amortization of tax credits against taxable income.\nReconciliation of CWIP in Rate Base to FERC Form 1 - Note B\nLess: CWIP and \nAFUDC Excluded \nfrom Rate Base\nCWIP allowed in \nRate Base\n216.b for end of \nyear, records for \nother months\nAverage of the 13 \nMonthly Balances\nFERC balance sheet \naccount where \nreserves are \nrecorded \nFERC income \nstatement account \nwhere expenses are \nrecorded\nEnter 1 if NOT in a \ntrust or reserved \naccount, enter zero (0) \nif included in a trust or \nreserved account\nEnter 1 if the accrual \naccount is included in \nthe formula rate, enter \n(0) if the accrual \naccount is NOT \nincluded in the formula \nrate\nEnter the percentage \npaid for by customers \nless the percent \nassociated with an \noffsetting liability on \nthe balance sheet (Note \nH)\nAllocation (Plant or \nLabor Allocator)\nAmount Allocated, \ncol. c x col. d x col. e \nx col. f x col. g\nRecovery of CWIP in rate base must be approved by FERC.  Lines 29-41 of page 2 provide a reconciliation of the Company's total CWIP to the CWIP allowed in rate base. The annual report filed pursuant to the Protocols \nwill include for each project under construction (i) the CWIP balance eligible for inclusion in rate base; (ii) the CWIP balance ineligible for inclusion in rate base; and (iii) a demonstration that AFUDC is only applied to \nthe CWIP balance that is not included in rate base The annual report will also describe the reconciliation prepared on this Attachment\nRecovery of a Regulatory Asset is permitted only for pre-commercial and formation expenses, and is subject to FERC approval before the amortization of the Regulatory Asset can be included in rates. Recovery of any \nother regulatory assets requires authorization from the Commission.\nThe Formula Rate shall include a credit to rate base for all unfunded reserves (funds collected from customers that (1) have not been set aside in a trust, escrow or restricted account; (2) whose balance are collected from \ncustomers through cost accruals to accounts that are recovered under the Formula Rate; and (3) exclude the portion of any balance offset by a balance sheet ac count (see Note H)).  Each unfunded reserve will be included \non lines 42 above. The allocator in Col. (g) will be the same allocator used in the formula for the cost accruals to the account that is recovered under the Formula Rate.  Since reserves can be created by creating an \noffsetting balance sheet account, rather than through cost accruals, the amount to be deducted from rate base should exclude the portion offset by another balance sheet account.\nNot all unfunded reserves are created only from contributions from customers. Many are created by creating an offsetting liability in whole or in part.  Column (f) ensures only the portion of the unfunded reserve \ncontributed by the customer (and not created by an offsetting liability) is a reduction to rate base.\nThe inputs in Column (f) are the percentage of the unfunded reserve that was created by an offsetting liability. The percentage shown in Column (f) is then equal to the percentage that customers have contributed to the \nunfunded reserve."},{"page":269,"startToken":100814,"endToken":101191,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 5\nReturn on Rate Base Worksheet\nDesertLink, LLC\nRETURN ON RATE BASE ( R )\n$\n1\nLong Term Interest (117, sum of 62.c through 67.c) (Note D)\n                                -   \n2\nPreferred Dividends (118.29c) (positive number)\n                                -   \n3\nProprietary Capital (Line 25 (c))\n                                -   \n4\nLess Preferred Stock (Line 9) \n                                -   \n5\nLess Account 216.1 Undistributed Subsidiary Earnings (Line 25 (d))     \n                                -   \n6\nLess Account 219 Accum. Other Comprehensive Income (Line 25 (e))        \n                                -   \n7\nCommon Stock\n(Sum of Lines 3 through 6)   \n                                -   \n$\n%\nCost\nWeighted\n8\nLong Term Debt\nLine 25 (a), Note A and Appendix III Note Q\n                                -   \n50.00%\n0.000%\n0.00%\n=WCLTD\n9\nPreferred Stock\nLine 25 (b), Note B and Appendix III Note Q\n                                -   \n0.00%\n0.00%\n0.00%\n10\nCommon Stock\nLine 7, Note C  and Appendix III Notes Q and T\n                                -   \n50.00%\n9.80%\n4.900%\n11\nTotal\n(Sum of Lines 8 through 10)\n                                -   \n4.90%\n=R\n(a)\n(b)\n( c ) \n(d) \n( e ) \nMonthly Balances for Capital Structure\n12\nDecember (Prior Year)\n                               -                                 -                             -                                   -                                 -   \n13\nJanuary\n                               -                                 -                             -                                   -                                 -   \n14\nFebruary\n                               -                                 -                             -                                   -                                 -   \n15\nMarch\n                               -                                 -                             -                                   -                                 -   \n16\nApril\n                               -                                 -                             -                                   -                                 -   \n17\nMay\n                               -                                 -                             -                                   -                                 -   \n18\nJune\n                               -                                 -                             -                                   -                                 -   \n19\nJuly\n                               -                                 -                             -                                   -                                 -   \n20\nAugust\n                               -                                 -                             -                                   -                                 -   \n21\nSeptember\n                               -                                 -                             -                                   -                                 -   \n22\nOctober\n                               -                                 -                             -                                   -                                 -   \n23\nNovember\n                               -                                 -                             -                                   -                                 -   \n24\nDecember\n                               -                                 -                             -                                   -                                 -   \n25\n13-Month Average\n                               -                                 -                             -                                   -                                 -   \nNotes\nA\nB\nPreferred Stock balance will reflect the 13 month average of the balances, of which the 1st and 13th are found on page 112 line 3.c in the Form No. 1\nC\nCommon Stock balance will reflect the 13 month average of the balances, of which the 1st and 13th are found on Form 1 page 112 line 16.c less lines 3.c , 12.c, and 15.c\nD\nLong-term interest will exclude any short-term interest included in FERC Account 430, Interest on Debt to Associated Companies\nLong Term Debt \n(Note A)\nPreferred Stock \n(112.3.c)\nProprietary \nCapital (112.16.c)\nUndistributed Sub \nEarnings 216.1 \n(112.12.c)\nAccum Other Comp. \nIncome 219 \n(112.15.c)\nLong Term debt balance will reflect the 13 month average of the balances, of which the 1st and 13th are found on page 112, lines 18.c to 21.c, in the Form No. 1; the cost is calculated by \ndividing line 1 by the Long Term Debt balance on line 8."},{"page":270,"startToken":101191,"endToken":101540,"text":"Page 1 of 1\nFor the twelve months ended 12/31/\nAttachment 6\nInterest on True-Up\nDesertLink, LLC\nAppendix III K23\nLine\nRate Year\nRate Year\nProjected Revenue Requirement (Note A)\n1\n                                                                                         -   \nLess\n $                             -   \nEquals\n $                        -   \nNote A - Projected ATRR for the true-up year from Page 1, Line 1 of Projection Appendix III minus Line 6 of Projection Appendix III.\nNote B - Actual Net ATRR for the true-up year from Page 1, Line 9 of True-Up Appendix III.\nInterest Rate on Amount of Refunds or Surcharges\nMonths\nAmortization\n2\n0.000%\nAn over or under collection will be recovered pro rata over year collected, held for one year and returned pro rata over next year\nMonthly\n3\nJanuary\nRate Year\n                                -   \n0.000%\n12\n                          -   \n                              -   \n4\nFebruary\nRate Year\n                                -   \n0.000%\n11\n                          -   \n                              -   \n5\nMarch\nRate Year\n                                -   \n0.000%\n10\n                          -   \n                              -   \n6\nApril\nRate Year\n                                -   \n0.000%\n9\n                          -   \n                              -   \n7\nMay\nRate Year\n                                -   \n0.000%\n8\n                          -   \n                              -   \n8\nJune\nRate Year\n                                -   \n0.000%\n7\n                          -   \n                              -   \n9\nJuly\nRate Year\n                                -   \n0.000%\n6\n                          -   \n                              -   \n10\nAugust\nRate Year\n                                -   \n0.000%\n5\n                          -   \n                              -   \n11\nSeptember\nRate Year\n                                -   \n0.000%\n4\n                          -   \n                              -   \n12\nOctober\nRate Year\n                                -   \n0.000%\n3\n                          -   \n                              -   \n13\nNovember\nRate Year\n                                -   \n0.000%\n2\n                          -   \n                              -   \n14\nDecember\nRate Year\n                                -   \n0.000%\n1\n                          -   \n                              -   \n15\n                          -   \n                              -   \nAnnual\n16\nJanuary through December\nRate Yr. + 1                                 -   \n0.000%\n12\n                          -   \n                              -   \nOver (Under) Recovery Plus Interest Amortized and Recovered Over 12 Months\nMonthly\n17\nJanuary\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n18\nFebruary\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n19\nMarch\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n20\nApril\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n21\nMay\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n22\nJune\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n23\nJuly\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n24\nAugust\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n25\nSeptember\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n26\nOctober\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n27\nNovember\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n28\nDecember\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n29\n                          -   \n30\nTotal Amount of True-Up Adjustment\n $                           -   \n31\nLess Over (Under) Recovery\n $                        -   \n32\nTotal Interest\n $                           -   \nActual Net Revenue \nRequirement (Note B)\nOver (Under) \nRecovery\nOver (Under) \nRecovery Plus \nInterest\nMonthly Interest \nRate on Attachment \n6a\nCalculated \nInterest\nSurcharge (Refund) \nOwed\nCalculation of Interest"},{"page":271,"startToken":101540,"endToken":101702,"text":"Page 1 of 1\nFor the twelve months ended 12/31/\nAttachment 6a\nTrue-Up Interest Rate Calculator\nDesertLink, LLC\nThis Attachment is used to compute the interest rate to be applied to each year's revenue requirement true-up.\nApplicable FERC Interest Rate (Note A):\n1\nRate Year January\n0.00%\n2\nRate Year February\n-\n3\nRate Year March\n-\n4\nRate Year April\n-\n5\nRate Year May\n-\n6\nRate Year June\n-\n7\nRate Year July\n-\n8\nRate Year August\n-\n9\nRate Year September\n-\n10\nRate Year October\n-\n11\nRate Year November\n-\n12\nRate Year December\n-\n13\nRate Year Plus 1  January\n-\n14\nRate Year Plus 1  February\n-\n15\nRate Year Plus 1  March\n-\n16\nRate Year Plus 1  April\n-\n17\nRate Year Plus 1  May\n-\n18\nAverage Rate\n0.00%\n19\nMonthly Average Rate\n0.00%\nNote A - Lines 1-17 are the FERC interest rates under section 35.19a of the regulations for the period shown. Line 18 is the average of lines 1-17."},{"page":272,"startToken":101702,"endToken":101971,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 7\nWeighted Average Federal and State Income Tax Rates\nDesertLink, LLC\nSubchapter C\nMutual\nPensions, IRAs\nUBTI\nNon-Taxpaying\nWeighted \nLine\nDescription\nSource\nCorporations\nIndividuals\nFunds\nKeogh Plans\nEntities\nEntities\nAverage\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n1\nWeighted Marginal Federal Income Tax Rate\nNote A\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n2\nAllocated Income Percentage\nNote B\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n3\nWeighted Average \nLine 1 x Line 2\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n4\nWeighted Average Federal Income Tax Rate \nSum of Line 3, Col. (c)-(h)\n0.00%\n5\nWeighted Marginal State Income Tax Rate\nNote C\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n6\nAllocated Income Percentage\nNote B\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n7\nWeighted Average \nLine 5 x Line 6\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n8\nWeighted Average State Income Tax Rate\nSum of Line 7, Col. (c)-(h)\n0.00%\nA\nFor each Rate Year, DesertLink will develop a schedule calculating the weighted average federal income tax rate for each category of partners. \nB\nThis percentage is developed based on the distributive income allocated to each category of partners rather than their respective ownership percentages.\nC\nFor each Rate Year, DesertLink will develop a schedule calculating the weighted average state income tax rate for each category of partners."},{"page":273,"startToken":101971,"endToken":102555,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 8\nCost of Debt Prior to Issuing Non-Construction Financing\nDesertLink, LLC\nThis Attachment 8 is to be utilized to determine the cost of debt prior to issuing non-construction financing.  Once non-construction financing is issued the cost of debt shall be determined using the methodology described in Note Q on Appendix III.\nIf construction debt has not or will not be issued when construction starts, a proxy rate will be used for the cost of debt, which will be supported in the initial section 205 filing. The proxy rate will be entered on line 36 of this attachment.\nIf construction financing is obtained, all rates, fees and monthly debt balances will be subject to true up pursuant to Attachment 9.\nAny hypothetical amounts in a filed template will be removed and replaced with actual amounts in the first year actual construction loans are borrowed or projected to be borrowed without the need for a section 205 filing to modify the template.\nLine No\n1\nInterest rate on Construction Debt for Rate Year - Line 19 (g)\n0.00%\n2\nRate Year Debt Fee expense - Line 35 (e)\n0.00%\n3\nTotal Cost of Debt - Sum of Lines 1 and 2\n0.0000%\nInterest Rate Information\n4\nCommitment Fee Rate (%)\n5\nProjected Average Drawn Rate for Rate Year (%) - Note A\nMonth During Rate Year\nTotal Loan Amount ($000)\nInterest Expense ($000)\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n6\nDecember Prior Year\n                            -                                         -                                          -                                          -   \n7\nJanuary\n                            -                                         -                                          -                                          -   \n8\nFebruary\n                            -                                         -                                          -                                          -   \n9\nMarch\n                            -                                         -                                          -                                          -   \n10\nApril\n                            -                                         -                                          -                                          -   \n11\nMay\n                            -                                         -                                          -                                          -   \n12\nJune\n                            -                                         -                                          -                                          -   \n13\nJuly\n                            -                                         -                                          -                                          -   \n14\nAugust\n                            -                                         -                                          -                                          -   \n15\nSeptember\n                            -                                         -                                          -                                          -   \n16\nOctober\n                            -                                         -                                          -                                          -   \n17\nNovember\n                            -                                         -                                          -                                          -   \n18\nDecember\n                            -                                         -                                          -                                          -   \n19\nAverage of the 13 Monthly Balances\n                            -   \n                                        -                                          -   \n0.00%\nExample Fee Calculation - All amounts represent actual rate year expenses.\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\nOrigination Fees           \nRate/Fees\nGross Fee Amount ($000)\nYear Fee Incurred\n20\nUnderwriting Discount\n0.00%\n -\n -\n21\nArrangement Fee\n0.00%\n -\n -\n22\nUpfront Fee\n0.00%\n -\n -\n23\nRating Agency Fee\n0.00%\n -\n -\n24\nLegal Fees\n0.00%\n -\n -\n25\nOther\n0.00%\n -\n -\n26\n   Total Issuance Expense / Origination Fees - Sum of Lines 20-25\n -\n -\n -\n -\n27\n28\nAnnual Fees\n29\nAnnual Rating Agency Fee\n0.00%\nN/A\n -\nN/A\nN/A\n30\nAnnual Bank Agency Fee\n0.00%\nN/A                                      -   \nN/A\nN/A\n31\nUtilization Fee\n0.00%\nN/A\n -\nN/A\nN/A\n32\nOther Fees\n0.00%\nN/A\n -\nN/A\nN/A\n33\nTotal Fees\n -\n -\n -\n -\n34\n13 Month Average Debt balance - Line 19 (c)\n                                        -   \n35\nRate Year cost of fees\n0.00%\n36\nProxy Debt rate. Used prior to issuance of construction financing and supported in initial section 205 filing.\n3.2220%\nNotes\nA\nLIBOR\n0.0000%\nSpread\n2.3500%\nTotal\n2.3500%\nIf construction financing has been obtained, the cost of debt prior the issuance of non-construction financing shall be based on the terms of the construction financing and determined below. Up-front fees including origination fees will be amortized and \nincluded in the cost of debt.\nPrincipal Drawn \n($000)\nUnutilized Loan \nBalance ($000)\nCommitment Fee & \nUtilization Fee ($000)\nEffective Annual \nInterest Rate (%)\nFee Amortization Period \n(years)\nRate Year Amortized Fee \nAmount, col. b / col. d\nPrior Years Accumulated \nFee Amortization\nUnamortized Balance \n- End of Rate Year\nProjected rate will be Average LIBOR for rate year + spread. Spread will be supported in initial section 205 filing. LIBOR will be updated based on information in the Wall Street Journal as of the 15th day of the month prior to population of this \ntemplate."},{"page":274,"startToken":102555,"endToken":102911,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 9\nTrue-Up - Construction Financing Cost of Debt\nDesertLink, LLC\nOne time up-front debt fees, including origination fees will be amortized and included in the cost of debt.\nLine No.\n$\n1\nLong Term Interest and Fees (117, sum of 62.c through 67.c) -- Notes A and B\n                                    -   \n2\nLine of Credit Fees (68.c) -- Note C\n                                    -   \n3\nTotal Interest and Fees\n                                    -   \n13 Month Average Long-Term Debt - Notes A and D\nMonth During Rate Year\nLong Term Debt\n(a)\n(d)\n4\nDecember Prior Year\n                                    -   \n5\nJanuary\n                                    -   \n6\nFebruary\n                                    -   \n7\nMarch\n                                    -   \n8\nApril\n                                    -   \n9\nMay\n                                    -   \n10\nJune\n                                    -   \n11\nJuly\n                                    -   \n12\nAugust\n                                    -   \n13\nSeptember\n                                    -   \n14\nOctober\n                                    -   \n15\nNovember\n                                    -   \n16\nDecember\n                                    -   \n17\nAverage of the 13 Monthly Balances\n                                    -   \n18\nTrue-Up Cost of Debt (Line 3 / Line 17)\n0.00%\nNotes\nA\nB\nLong-term interest will exclude any short-term interest included in FERC Account 430, Interest on Debt to Associated Companies.\nC\nLine of credit fees will include only those related to long-term debt and not for short-term debt.\nD\nLong-term debt will exclude any short-term debt included in FERC Account 233, Notes Payable to Associated Companies.\nThis Attachment 9 is to be utilized only in the event construction financing has been obtained to compute the actual cost of debt to be included in the return on rate base calculation for the true-up each year prior to the \nissuance of non-construction financing. Once non-construction financing has been obtained the cost of debt shall be determined using the methodology described in Note Q on Appendix III.\nAny hypothetical amounts in a filed template will be removed and replaced with actual amounts in the first year actual construction loans are borrowed or projected to be borrowed without the need for a section 205 \nfiling to modify the template.\nLong Term debt balance will reflect the 13 month average of the balances, of which the 1st and 13th are found on page 112, line 24, columns d and c, respectively, in the Form No. 1; the cost is calculated by \ndividing line 1 by the Long Term Debt balance on line 8."},{"page":275,"startToken":102911,"endToken":103145,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 10\nDepreciation Rates\nDesertLink, LLC\nTRANSMISSION AND GENERAL PLANT DEPRECIATION RATES\nAnnual Depreciation Rates\nLine No.\n(Note A)\nINTANGIBLE PLANT\n1\n303.1\nContributions in Aid of Construction\nNote B\n2\n303.2\nInterconnections\n2.27% \n3\n303.3\nLicenses\n1.59%\nTRANSMISSION PLANT\n4\n350.2\nLand Rights\n1.43%\n5\n351.1\nComputer Hardware\n20.00%\n6\n352.0\nStructures & Improvements\n1.95%\n7\n353.0\nStation Equipment\n2.58%\n8\n354.0\nTowers & Fixtures\n1.86%\n9\n355.0\nPoles & Fixtures\n2.17%\n10\n356.0\nOverhead Conductors & Devices\n2.01%\n11\n392.0\nTransportation Equipment\n10.00%\n12\n393.0\nStores Equipment\n6.67%\n13\n394.0\nTools, Shop, and Garage Equipment\n12.50%\n14\n397.2\nComputer Software\n11.64%\nNotes\nA\nThese depreciation rates will not be changed absent a FERC order.\nB\nGENERAL PLANT\nIn the event a Contribution in Aid of Construction (CIAC) is made for a transmission facility, the transmission depreciation rates above will be \nweighted based on the relative amount of underlying plant booked to the accounts shown in lines 4-12 above, and the resultant weighted average \ndepreciation rate will be used to amortize the CIAC.   The CIAC depreciation rate for each facility will be determined at the time the plant is \nplaced into service, and will not change  without FERC approval."},{"page":276,"startToken":103145,"endToken":103383,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 11\nPrior Period Adjustments\nDesertLink, LLC\n(a)\n(b)\nCalendar Year\nLine No. Description\nSource\nRevenue Impact of Correction\nRevenue Requirement\n1\nFiling Name and Date\n                                                        -   \n2\nOriginal Revenue Requirement\n                                                              -   \n3\n4\nDescription of Correction 1\n                                                              -   \n5\nDescription of Correction 2\n                                                              -   \n6\n7\nTotal Corrections\nLine 4 + 5\n                                                              -   \n8\n9\nCorrected Revenue Requirement\nLine 2 + 7\n                                                              -   \n10\n11\n12\nTotal Corrections\nLine 7\n                                                              -   \n13\n14\nAverage Monthly FERC Refund Rate\nNote A\n0.00%\n15\nNumber of Months of Interest\nNote B\n30\n16\nInterest on Correction\nLine 12 x 14 x 15\n                                                              -   \n17\n18\nTotal Annual Amount Due from / (to) Customers\nLine 12 + 16\n                                                              -   \nNotes\nA\nB\nThe interest rate on corrections will be the average monthly FERC interest rate for the period from the beginning of the year being corrected through the most recent  month available as of \nthe time the correction is computed and included in an annual filing.\nThe number of months interest due on the correction will be the number of months from the beginning of the year being corrected through June of the year in which the correction will be \nreflected in rates. In this manner the interest computed will reflect all years prior to when the correction is reflected in rates plus interest on the average unrefunded balance of the \ncorrection during the year the correction is reflected in rates."},{"page":277,"startToken":103383,"endToken":103595,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 12\nRevenue Credit Detail\nDesertLink, LLC\n(a)\n(b)\n(c) = (a) - (b)\nLine No.\n(Note A)\nSource\nCompany Total\nLess: Non Transmission\nTransmission-related\n1\nAccount 454 - Rent from Electric Property\n2\nJoint pole attachments - telephone\nCompany books\n                                          -                                                      -                                                                                                                 -   \n3\nJoint pole attachments - cable\nCompany books\n                                          -                                                      -                                                                                                                 -   \n4\nUnderground rentals\nCompany books\n                                          -                                                      -                                                                                                                 -   \n5\nTransmission tower wireless rentals\nCompany books\n                                          -                                                      -                                                                                                                 -   \n6\nOther rentals\nCompany books\n                                          -                                                      -                                                                                                                 -   \n7\nOther rentals\nCompany books\n                                          -                                                      -                                                                                                                 -   \n8\nAccount 454 Revenue Credit\nForm 1 300.19.b\n                                          -                                                      -                                                                                                                 -   \n9\nAccount 456.1 Other Operating Revenues\n10\nCAISO NITS\nCompany books\n                                          -                                                      -                                                                                                                 -   \n11\nCAISO Point to Point\nCompany books\n                                          -                                                      -                                                                                                                 -   \n12\nOver/Under recovery deferral\nCompany books\n                                          -                                                      -                                                                                                                 -   \n13\nOther Transmission Service Revenues\nCompany books\n                                          -                                                      -                                                                                                                 -   \n14\nOther\nCompany books\n                                          -                                                      -                                                                                                                 -   \n15\nTotal Per Books\nForm 1 330.n\n                                          -                                                      -                                                                                                                 -   \n16\nLess: revenues received pursuant to this Formula Rate\n                                          -                                                      -                                                                                                                 -   \n17\nLess: Over/Under recovery deferral\n                                          -                                                      -                                                                                                                 -   \n17a\nLess: Revenue Credits included in the TRBAA\n                                          -                                                      -                                                                                                                 -   \n18\nAccount 456.1 Revenue Credit\n                                          -                                                      -                                                                                                                 -   \n19\nTotal Revenue Credits\n(Line 8 + line 18)\n                                          -                                                      -                                                                                                                 -   \nNote A\nAll 454 and 456.1 revenues will be detailed from Company books and records or FERC Form 1, and additional rows added if necessary.  Non-transmission-related amounts will be deducted to determine transmission-related amounts.\n(Line 15 - line 16 - line 17 \n- line 17a)"},{"page":278,"startToken":103595,"endToken":104017,"text":"DesertLink, LLC\nAttachment 13 - Excess or Deficient Accumulated Deferred Income Taxes - Summary\n[Year] \n[Projected or Actual]\nLine No. \n1\n2\n[List of tax law changes, accounting treatment, and asscociated explanatory notes.]\n3\nRate Base Adjustment Mechanism - Summary\n4\nAccount\nAmount\nReferences\n5\n182.3 (debit or <credit>)\n                        -   \n6\n254 (debit or <credit>)\n                        -   \n7\nTotal Deficient or (Excess) ADIT (sum of lines 5-6)\n                        -   To Appendix III, Page 2, Line 22a, Col. (3)\n8\n9\nIncome Tax Allowance Adjustment Mechanism - Summary\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n10\n11\n[Insert rows as necessary]\n                        -   \n                        -   \n11a\n[Insert rows as necessary]\n                        -   \n                        -   \n11…\n[Insert rows as necessary]\n                        -   \n                        -   \n12\nTotal\n(sum of lines 11_)\n                        -   \n                        -   \n13\n14\n[Explanatory statements as needed]  \nThe primary purposes of this worksheet are to: \n - reconcile the amounts of regulatory assets and liabilities comprising the rate base adjustment mechanism on Appendix III, Page 2, Line 22a (ADJUSTMENTS TO RATE BASE > Deficient or (Excess) ADIT) as of the beginning and end of the current test \nperiod (summarized beginning at Line 3 below) and \n- to support the amount of excess deferred tax expense or benefit recognized due to enacted change(s) in tax rate(s) on Appendix III, Page 3, Line 40 (INCOME TAXES > Deficient or (Excess) Deferred Income Taxes) and the effect of such excess deferred \ntax expense or benefit on the revenue requirement as reflected in the income tax allowance adjustment mechanism on Appendix III, Page 3, Line 44 (INCOME TAXES > Deficient or (Excess) Deferred Income Tax Adjustment) during the test period \n(summarized beginning on Line 9 below).  \nThis worksheet supports the computation of the projected revenue requirement or, as appropriate, the actual revenue requirement used to compute the true-up adjustment.\nEach tax law change addressed by this worksheet with its associated explanatory note is listed below.  Amounts related to each tax law change are provided and supported throughout this worksheet.  Additional lines and explanatory notes will be added to \nthis worksheet as necessary as tax law changes are enacted without the need for an FPA Section 205 filing. \nThe amounts summarized above are computed in the Rate Base Adjustment Mechanism-Reconciliation of Beginning and End of Test Period Balances section of the worksheet with proration and averaging of activity during the test period computed in \ndifferent section of Attachment 13.1 for projected revenue requirement calculations and actual revenue requirement calculations.\n Amortization or \nMitigation of \nDeficient or \n<Excess> ADIT \n Tax Gross-up \nFactor \n Amortization or \nMitigation with \nTax Gross-up \n To Appendix III, \nPage 3, Line 40, \nCol. (3) \n To Appendix III, \nPage 3, Line 44, \nCol. (3)"},{"page":279,"startToken":104017,"endToken":104515,"text":"15\nRate Base Adjustment Mechanism - Reconciliation of Beginning and End of Test Period Balances\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n(j)\n16\nDescription (+ = debit, <> = credit)\nAmortization period and method\n17\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n17a\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n17b\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n17...\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n18\nTotal for account 182.3\n(sum of lines 17_)\n                        -                           -                           -                           -                           -   \n19\n FN1. pg 232 \n FN1. pg 232 \n20\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n20a\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n20b\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n20...\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n21\nTotal for account 254\n(sum of lines 20_)\n                        -                           -                           -                           -                           -   \n22\n FN1. pg 278 \n FN1. pg 278 \n23\n24\nIncome Tax Allowance Adjustment Mechanism\n25\n26\nAmortization of Excess or Deficient ADIT\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n(j)\n27\nDescription (+ = debit, <> = credit)\nComments\n28\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n28a\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n28b\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n28...\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n29\nTotal for account 182.3\n(sum of lines 28_)\n                        -                           -                           -                           -                            -   \n30\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n30a\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n30b\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n30...\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n31\nTotal for account 254 \n(sum of lines 30_)\n                        -                           -                           -                           -                            -   \n32\nTotal amortization and offsetting entries\n(sum of lines 29 & 31)                         -                           -                           -                           -                            -   \n33\nNet income tax expense or benefit\n(sum of lines 32(f) & 32(g))\n                        -   \n To line 11 \nBalance at \nBeginning of \nYear\nRe-\nmeasurement of \nADIT\nAnnual \nAmortization \n(Note 4)\nOther \nAdjustments\n(Note 5)\nBalance at End \nof Year \n(d)+(e)+(f)+\n(g)\nWhether subject \nto normalization \nrules\n(Note 6)\nAnalysis - Balances of tax-related regulatory assets and liabilities include tax gross-up.  Accordingly, for the regulatory assets and liabilities for deficient or excess deferred taxes included in rate base, the related deferred tax assets and liabilities are also \nincluded in rate base.  Remeasurements in column (e) are described in Notes 2 and 3 and are based on the journal entry below and the support on the worksheet for the applicable tax law change.  Averaging or proration of amounts affecting rate base is \ncomputed on different sections of Attachment 13.1 for projected revenue requirement and actual revenue requirement. \nThe income tax allowance adjustment mechanism may include amortization of excess or deficient ADIT pertaining to deferred tax expense or benefit reflected in rates at a historical tax rate when the underlying timing difference(s) originated (computed \nunder Amortization of Excess or Deficient ADIT within the Income Tax Allowance Adjustment Mechanism section of this worksheet) as well as an adjustment for tax law changes with prospective effective dates intended to mitigate the over- or under-\nrecovery of deferred income taxes originating prior to the effective date of such tax law changes (computed under Adjustment for Tax Law Changes with Prospective Effective Dates within the Income Tax Allowance Adjustment Mechanism section of this \nworksheet).\nAnnual \nAmortization \nfrom Table \nAbove\n(Note 4)\nDebit or \n<Credit> to \nAccount 410.1\nDebit or \n<Credit> to \nAccount 411.1\nDebit or \n<Credit> to \nAccount 190\nDebit or \n<Credit> to \nAccount 283"},{"page":280,"startToken":104515,"endToken":105088,"text":"34\nAdjustment for Tax Law Changes with Prospective Effective Dates\n35\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n(j)\n(k)\n36\n37\n (c) x (d) \n1 / (1- (d))\n (e) x (f) \n - [(c) x (h)] \n (e) + (i) \n (j) x (f) \n38\n[Insert rows as necessary]\n                        -   \n                        -   \n                         -                           -                           -   \n To line 11 \n38…\n[Insert rows as necessary]\n                        -   \n                        -   \n                         -                           -                           -   \n To line 11 \n39\nNote 1 - Summary of re-measurement of ADIT resulting from tax law changes\n40\n41\nNote 1a - Summary of re-measurement of ADIT resulting from \n[name of tax law change]\nAdditional information is provided in Note \n42\nRe-measurement entry \n(a)\n(b)\n(c) \n43\nAccount\nComments or References\n44\n190\n45\n281\n46\n282\n47\n283\n48\n182.3 (tax-related, included in rate base - protected)\n49\n182.3 (tax-related, included in rate base - unprotected)\n50\n182.3 (tax-related, not in rate base))\n51\n190 (related to portion of acct. 182.3 not in rate base)\n52\n254 (tax-related, included in rate base - protected)\n53\n254 (tax-related, included in rate base - unprotected)\n54\n254 (tax-related, not in rate base)\n55\n283 (related to portion of acct. 254 not in rate base)\n56\nAccount 410.1\n57\nAccount 411.1\n58\nAccount 410.2\n59\nAccount 411.2\n60\nTotal\n (sum of lines \n                        -   \n61\n[Insert additional analysis.]\nIn the case of tax law changes with an effective date(s) after the beginning of the test period, the impact of a timing difference on current tax expense or benefit differs from the impact on ADIT.  For example, in the case \nof a deductible timing difference originating in a tax year with a higher enacted tax rate than will apply when the difference will reverse, the current tax benefit will exceed the deferred tax expense.  In this situation, the \nadjustment computed below to recoverable income tax expense is made in order to avoid over-recovering income tax expense in the current test period due to the excess of current tax benefit over deferred tax expense \n(computed based on the estimated amount of the future tax liability) with respect to a given timing difference.  The adjustment to recoverable tax expense during the test period in which a timing difference originates \nmitigates the need for refund of a regulatory liability for excess deferred taxes in a future period (or, as applicable, the need for recovery of a regulatory asset for deficient deferred taxes in a future period).  Amounts in \ncolumn (i) are reported in the Income Tax Allowance Adjustment Mechanism - Summary on this worksheet.\n Originating \nTaxable or \n(Deductible) \nBook / Tax \nDifference for \nTest Year \n Tax Rate for \nTest Year \n Current Tax \nExpense or \n(Benefit) in Test \nYear \n Tax Gross-up \nFactor for Test \nYear \n Revemue \nRequirement \nImapct for Test \nYear \n Enacted Tax \nRate for the \nReversal Year(s) \n Deferred Tax \nExpense or \n(Benefit) in Test \nYear \n Total Tax \nExpense or \n(Benefit) in Test \nYear \n Adjustment to \nMitigate \nOver/under-\nrecovery of \nDeferred Taxes  \nThe purposes of this portion of the worksheet are, for each change in tax law, to explain: \n- how any ADIT accounts were re-measured, \n- the excess or deficient ADIT contained therein, and \n- the accounting for any excess or deficient amounts in Accounts 182.3 (Other Regulatory Assets) and 254 (Other Regulatory Liabilities).\nNote 2 describes how ADIT accounts are re-measured upon a change in income tax law.  A separate summary (i.e., Note 1a, Note 1b, etc.) will be added for each tax law change resulting in a re-measurement of ADIT.\nDebit or \n<Credit>"},{"page":281,"startToken":105088,"endToken":105638,"text":"62\nNote 1b - Summary of \n[name of tax law change]\nAdditional information is provided in Note \n63\n[Insert additional analysis.]\n64\nNote 1b - Summary of \n[name of tax law change]\nAdditional information is provided in Note \n65\n66\n67\n68\n69\n[Continuation of note with respect to particular changes in tax law.]\n70\n[Insert additional notes as needed.]\nNote 2 - Explanation of how ADIT accounts are re-measured upon a change in income tax law\nDeferred tax assets and liabilities are adjusted (re-measured) for the effect of the changes in tax law (including tax rates) in the period that the change is enacted.  Adjustments are recorded in the appropriate deferred tax \nbalance sheet accounts (Accounts 190, 281, 282 and 283) based on the nature of the temporary difference and the related classification requirements of the accounts.   If as a result of action or expected action by a \nregulator, it is probable that the future increase or decrease in taxes payable due to the change in tax law or rates will be recovered from or returned to customers through future rates, a regulatory asset or liability is \nrecognized in Account 182.3 (Other Regulatory Assets), or Account 254 (Other Regulatory Liabilities), as appropriate, for that probable future revenue or reduction in future revenue.  Re-measurements of deferred tax \nbalance sheet accounts may also result in re-measurements of tax-related regulatory assets or liabilities that had been recorded prior to the change in tax law.  If it is not probable that the future increase or decrease in taxes \npayable due to the change in tax law or rates will be recovered from or returned to customers through future rates, tax expense is recognized in Account 410.2 (Provision for Deferred Income Taxes, Other Income or \nDeductions) or tax benefit is recognized in Account 411.2 (Provision for Deferred Income Taxes-Credit, Other Income or Deductions), as appropriate.  \nNote 3 - [Complete to support information above.]\nNote 4 - The amortization of the deficient or excess ADIT reducing Account 254 (Other Regulatory Liabilities) is recorded with credits to Account 411.1 (Provision for Deferred Income Taxes – Credit, Utility Operating \nIncome) and to Account 190 (Accumulated Deferred Income Taxes) or Account 283 (Accumulated Deferred Income Taxes—Other), as appropriate, in accordance with the Commission’s Accounting for Income Taxes \nGuidance.  The amortization of the deficient or excess ADIT reducing Account 182.3 (Other Regulatory Assets) is recorded with debits to Account 410.1 (Provision for Deferred Income Taxes, Utility Operating Income) \nand to Account 190 (Accumulated Deferred Income Taxes) or Account 283 (Accumulated Deferred Income Taxes—Other), as appropriate, in accordance with the Commission’s Accounting for Income Taxes Guidance.  \nThis activity is summarized in the table \"Income Tax Allowance Mechanism - Projected\" or the table \"Income Tax Allowance Mechanism - Actual,\" as appropriate.  The annual amortization in the tables above reflects tax \ngross-up and is stated at the revenue requirement level. \nNote 5 - [Complete to support information above.]\nNote 6 -  The worksheet indicates whether each excess or deficient ADIT amounts are protected (i.e., subject to normalization rules of a taxing jurisdiction) or unprotected (i.e., not subject to normalization rules of a taxing \njurisdiction).  To the extent that normalization requirements apply to ADIT remeasurements, additional computations (e.g., proration of excess deferred tax activity related to future test periods) may be necessary."},{"page":282,"startToken":105638,"endToken":106027,"text":"DesertLink, LLC\nAttachment 13.1 - Regulatory Assets/Liabilities for Deficient/Excess ADIT - Averaging and Proration Adjustments \nSupport for Attachment 13 (Excess or Deficient Accumulated Deferred Income Taxes - Summary)\n[Year] \n[Projected or Actual]\nLine No.\n1\nRate year =\n2\nTest period days after rates become effective\n3\n4\nAccount 182.3 - Other Regulatory Assets (portion related to deficient or excess ADIT)\n5\n6\nBeginning balance  (debit or <credit>)\n                        -   \n7\nLess:  Portion not related to transmission\n                        -   \n8\nLess:  Portion not reflected in rate base\n                        -   \n9\nSubtotal:  Portion reflected in rate base\n                        -   \n10\nLess:  Portion subject to proration\n                        -   \n11\nPortion subject to averaging  (debit or <credit>)\n                        -   \n12\nEnding balance  (debit or <credit>)\n                        -   \n13\nLess:  Portion not related to transmission\n                        -   \n14\nLess:  Portion not reflected in rate base\n                        -   \n15\nSubtotal:  Portion reflected in rate base\n                        -   \n16\nLess:  Portion subject to proration (before proration)\n                        -   \n17\nPortion subject to averaging (before averaging)  (debit or <credit>)\n                        -   \n18\nEnding balance of portion subject to proration (prorated)  (debit or <credit>)\n                        -   From Line 36(n)\n19\nAverage balance of portion subject to averaging\n                        -   \n20\nAmount reflected in rate base  (debit or <credit>)\n                        -   To Att. 13, Line 5\nThis attachment includes sections that are populated only with actual data and thus, these sections remain blank when the formula rate template is \ncalculating a projected revenue requirement. Columns (i) through (n) below are not used for the projection and are only populated with actual data for the \nAnnual Update.   \nNote 1 - The computations below apply the proration rules of Treasury Regulation section 1.167(l)-1(h)(6) to the annual activity of the portions of the \ndeficient or excess accumulated deferred income taxes recorded in account 182.3 or 254 that are subject to the normalization requirements.  Activity \nrelated to the portions of the account balances reflected in rate base but not subject to the proration requirement is averaged instead of prorated.  The \nbalances below include tax gross-up.  The corresponding portions of the deferred tax asset related to the portions of the regulatory liability and the \ncorresponding portions of the deferred tax liability related to the portions of the regulatory asset are also reflected in rate base and prorated or averaged, \nas appropriate.  Columns (a) through (h) are used for projected and actual revenue requirements computations.  Columns (i) through (n) are used for \nactual revenue requirement computations.   \nAmount\ndebit / <credit>"},{"page":283,"startToken":106027,"endToken":106425,"text":"21\nAccount 182.3 - Other Regulatory Assets (portion related to deficient or excess ADIT)\nColumns (i) through (n) are not used for the calculation of the projected revenue requirement\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n(j)\n(k)\n(l)\n(m)\n(n)\n22\nMonth\nYear\n23\n \nprior month (d) + (c)\nLine 2\n[(c) x (e) / (f)]\nprior month (h) + (g)\n[Note 5]\n[Note 6]\n[Note 7]\n24\nDecember 31,\n-\n NA                               -   \nNA\n0\n NA                               -   \n NA \n NA \n NA \n NA \n NA                              -   \n25\nJanuary \n-\n                              -                                 -   \n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n26\nFebruary\n-\n                              -                                 -   \n307\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n27\nMarch \n-\n                              -                                 -   \n276\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n28\nApril\n-\n                              -                                 -   \n246\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n29\nMay\n-\n                              -                                 -   \n215\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n30\nJune\n-\n                              -                                 -   \n185\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n31\nJuly\n-\n                              -                                 -   \n154\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n32\nAugust \n-\n                              -                                 -   \n123\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n33\nSeptember\n-\n                              -                                 -   \n93\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n34\nOctober\n-\n                              -                                 -   \n62\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n35\nNovember\n-\n                              -                                 -   \n32\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n36\nDecember\n-\n                              -                                 -   \n1\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n37\nTotal \n                              -   \n                             -                                -   \n38\n39\nAccount 254 - Other Regulatory Liabilities (portion related to deficient or excess ADIT)\n40\n41\nBeginning balance  (debit or <credit>)\n                        -   \n42\nLess:  Portion not related to transmission\n                        -   \n43\nLess:  Portion not reflected in rate base\n                        -   \n44\nSubtotal:  Portion reflected in rate base\n                        -   \n45\nLess:  Portion subject to proration\n                        -   \n46\nPortion subject to averaging  (debit or <credit>)\n                        -   \n47\nEnding balance  (debit or <credit>)\n                        -   \n48\nLess:  Portion not related to transmission\n                        -   \n49\nLess:  Portion not reflected in rate base\n                        -   \n50\nSubtotal:  Portion reflected in rate base\n                        -   \n51\nLess:  Portion subject to proration (before proration)\n                        -   \n52\nPortion subject to averaging (before averaging)  (debit or <credit>)\n                        -   \n53\nEnding balance of portion subject to proration (prorated)  (debit or <credit>)\n                        -   From Line 70(n)\n54\nAverage balance of portion subject to averaging\n                        -   \n55\nAmount reflected in rate base  (debit or <credit>)\n                        -   To Att. 13, Line 6\nForecasted Monthly \nActivity\ndebit / <credit>\nForecasted \nMonth-end Balance\ndebit / <credit>\nDays until \nEnd of Test \nPeriod\nDays in Test \nPeriod\nProrated Forecasted \nMonthly Activity\ndebit / <credit>\nForecasted  Prorated \nMonth-end Balance\ndebit / <credit>\nActual Monthly \nActivity\nDifference between \nprojected monthly \nand actual monthly \nactivity.\nPreserve projected \nproration when actual \nmonthly and projected \nmonthly activity are \neither both increases \nor decreases.  \nFifty percent of the \ndifference between \nprojected and actual \nactivity when actual \nand projected activity \nare either both \nincreases or \ndecreases.  \nFifty percent of actual \nmonthly activity when \nprojected activity is \nan increase while \nactual activity is a \ndecrease OR projected \nactivity is a decrease \nwhile actual activity is \nan increase.\nBalance reflecting \nproration or \naveraging \n(i) - (c) \n [Note 4]\n(k) + (l) + (m) \n[Note 8]\nNote 2 - \nAmount\ndebit / <credit>"},{"page":284,"startToken":106425,"endToken":107101,"text":"56\nAccount 254 - Other Regulatory Liabilities (portion related to deficient or excess ADIT)\nColumns (i) through (n) are not used for the calculation of the projected revenue requirement\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n(j)\n(k)\n(l)\n(m)\n(n)\n57\nMonth\nYear\n58\n \nprior month (d) + (c)\nLine 2\n[(c) x (e) / (f)]\nprior month (h) + (g)\n[Note 5]\n[Note 6]\n[Note 7]\n58\nDecember 31,\n-\n NA                               -   \nNA\n0\n NA                               -   \n NA \n NA \n NA \n NA                              -   \n59\nJanuary \n-\n                              -                                 -   \n0\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n60\nFebruary\n-\n                              -                                 -   \n307\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n61\nMarch \n-\n                              -                                 -   \n276\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n62\nApril\n-\n                              -                                 -   \n246\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n63\nMay\n-\n                              -                                 -   \n215\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n64\nJune\n-\n                              -                                 -   \n185\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n65\nJuly\n-\n                              -                                 -   \n154\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n66\nAugust \n-\n                              -                                 -   \n123\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n67\nSeptember\n-\n                              -                                 -   \n93\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n68\nOctober\n-\n                              -                                 -   \n62\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n69\nNovember\n-\n                              -                                 -   \n32\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n70\nDecember\n-\n                              -                                 -   \n1\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n71\nTotal \n                              -   \n                             -                                -   \n72\n73\n74\n75\n76\n77\nForecasted Monthly \nActivity\ndebit / <credit>\nForecasted \nMonth-end Balance\ndebit / <credit>\nDays until \nEnd of Test \nPeriod\nDays in Test \nPeriod\nProrated Forecasted \nMonthly Activity\ndebit / <credit>\nForecasted  Prorated \nMonth-end Balance\ndebit / <credit>\nActual Monthly \nActivity\nDifference between \nprojected monthly \nand actual monthly \nactivity.\nPreserve projected \nproration when actual \nmonthly and projected \nmonthly activity are \neither both increases \nor decreases.  \nFifty percent of the \ndifference between \nprojected and actual \nactivity when actual \nand projected activity \nare either both \nincreases or \ndecreases.  \nFifty percent of actual \nmonthly activity when \nprojected activity is \nan increase while \nactual activity is a \ndecrease OR projected \nactivity is a decrease \nwhile actual activity is \nan increase.\nBalance reflecting \nproration or \naveraging \n(i) - (c) \n [Note 4]\n(k) + (l) + (m) \n[Note 8]\nNote 3 - \nNote 4  -  Column J is the difference between actual monthly and projected monthly activity (Column I minus Column C).  Specifically, if projected and \nactual activity are both positive, a negative in Column J represents over-projection (i.e., the amount of projected activity that did not occur) and a \npositive in Column J represents under-projection (i.e., the excess of actual activity over projected activity). If projected and actual activity are both \nnegative, a negative in Column J represents under-projection (i.e., the excess of actual activity over projected activity) and a positive in Column J \nrepresents over-projection (i.e., the amount of projected activity that did not occur). \nNote 5  -  Column K preserves the effects of excess ADIT proration from the projected revenue requirement when actual monthly excess ADIT activity \nand projected monthly excess ADIT activity are either both increases or decreases.  Specifically, if Column J indicates that excess ADIT activity was \nover-projected, enter Column G x [Column I / Column C].  If Column J indicates that excess ADIT activity was under-projected, enter the amount from \nColumn G and complete Column L).  In other situations, enter zero.\nNote 6  -  Column L applies when (1) Column J indicates that excess ADIT activity was under-projected AND (2) actual monthly and projected monthly \nactivity are either both increases or both decreases.  Enter 50 percent of the amount from Column J.  In other situations, enter zero.  The excess ADIT \nactivity in column L is multiplied by 50 percent to reflect averaging of rate base to the extent that the proration requirement has not been applied to a \nportion of the monthly excess ADIT activity.\nNote 7  -  Column M applies when (1) projected monthly activity was an increase while actual monthly activity was a decrease OR (2) projected monthly \nactivity was a decrease while actual monthly activity was an increase.  Enter 50 percent of the amount of actual monthly activity (Column I).  In other \nsituations, enter zero.  The excess ADIT activity in column M is multiplied by 50 percent to reflect averaging of rate base to the extent that the proration \nrequirement has not been applied to a portion of the monthly excess ADIT activity.\nNote 8  -  Column N is computed by adding the balance at the end of the prior month to EITHER (1) the sum of prorated monthly excess ADIT activity, \nif any, from Column K and the portion of monthly excess ADIT activity, if any, from Column L OR (2) the portion of monthly excess ADIT activity in \nColumn M."},{"page":285,"startToken":107101,"endToken":107604,"text":"DesertLink, LLC\nAttachment 13.2 - Re-measurement of ADIT and Tax-related Regulatory Assets and Liabilities Resulting from the Tax Change Identified in Line 1\nSupport for Attachment 13 (Excess or Deficient Accumulated Deferred Income Taxes - Summary)\n[Year] \n[Projected or Actual]\nLine No.\n1\n[Identify/describe the tax legislation/change]\n2\n[Describe the computation.]\n3\n4\n(a)\n(b)\n(c) \n(d)\n(e) \n(f)\n(g)\n(h)\n(i)\n(j)\n(k)\n(l)\n(m)\n(n)\n5\nBalances and rates prior to remeasurement\n[tax rate]\n[tax rate]\n[tax rate]\n[1/(1-tax rate)]\n[tax rate]\n6\nTemporary Difference\nAccount\nAccount\nAccount\nAccount\nAccount\n7\nItem\nNormalized?\nAmount\n190\n282\n283\n182.3\n283\n8\n[Insert rows as necessary]\n8a\n[Insert rows as necessary]\n8b\n[Insert rows as necessary]\n8...\n[Insert rows as necessary]\n9\nTotal\n                     -                      -                      -                      -                      - \n10\nRemeasured balances and rates\nOther accounts affected by remeasurement\n11\n[tax rate]\n[tax rate]\n[tax rate]\n[1/(1-tax rate)]\n[tax rate]\n[1/(1-tax rate [tax rate] /(1-tax rate [tax rate]\n12\nTemporary Difference\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\n13\nItem\nNormalized?\nAmount\n190\n282\n283\n182.3\n283\n410.2\n411.2\n254\n190\n182.3\n283\n14\n[Insert rows as necessary]\n14a\n[Insert rows as necessary]\n14b\n[Insert rows as necessary]\n14...\n[Insert rows as necessary]\n15\nTotal\n                     -                      -                      -                      -                      - \n              -               -               -               -               -               - \n16\nRemeasurement journal entry:  debt or <credit> (to Attachment 13)\n                     -                      -                      -                      -                      - \n              -               -               -               -               -               - \n17\nSummary of Effects on Tax-related Regulatory Assets and Liabilities\n18\nAccount 182.3 - included in rate base, subject to normalization rules\n19\nAccount 182.3 - included in rate base, not subject to normalization rules\n20\nAccount 182.3 - not included in rate base\n21\nAccount 254 - included in rate base, subject to normalization rules\n22\nAccount 254 - included in rate base, not subject to normalization rules\n23\nAccount 254 - not included in rate base\nThe ratemaking treatment of each item in terms of whether it is subject to the normalization requirements (i.e., P or \"protected\") or not subject to the normalization requirements (i.e., U or \"unprotected\") \nand included in rate base or not (i.e., RB or non-RB) is indicated in column (b).  The balances are measured at the composite tax rate in effect immediately before effective date of the change in tax law and \nremeasured immediately after the change in tax law.  Each set of balances includes the appropriate income tax rates and tax gross-up factors (as computed in the specific note for this tax law change in Att. \n13).  The journal entry to record the remeasurements (Line 16) is based on the differences in balances of accounts recorded prior to the change in law (columns (d)-(h)) and activity in other accounts \nresulting from the remeasurement (columns (i)-(n)).  The remeasurement entry is also included in Att. 13.  The accounting is further described in Att. 13, Note 2. \nThis worksheet will be included in support of the revenue requirement computation until the excess or deficient ADIT is fully amortized.  A similar worksheet will be used for subsequent changes in tax \nlaw resulting in re-measurement of ADIT."},{"page":286,"startToken":107604,"endToken":107613,"text":"Appendix V  PRO FORMA LARGE LOAD COST RECOVERY AGREEMENT"},{"page":287,"startToken":107613,"endToken":107971,"text":"1 \n \nDESERTLINK, LLC \n[PRO FORMA] LARGE LOAD COST RECOVERY AGREEMENT  \n \nThis Large Load Cost Recovery Agreement (this “Agreement”) is entered into as of this __ day \nof _______ 20  , by and between [________], a [●] and an Eligible Customer under the CAISO \nTariff (“Eligible Customer”), and DesertLink, LLC, a Delaware limited liability company \n(“DesertLink” or “Transmission Owner”). DesertLink and Eligible Customer are referred to \ncollectively as the “Parties” and individually as a “Party.”  \n[_______], a [●] (“Large Load Customer”), executes the Limited Acknowledgment set forth \nbelow solely for the purposes stated therein and is not a Party to the wholesale payment \nobligations established by this Agreement.  \n \nRECITALS \n \nWHEREAS, DesertLink is a transmission-only company established to develop, own, \nand operate transmission facilities (“Transmission Facilities”) pursuant to the provisions of its \nTransmission Owner Tariff (“TO Tariff”) and the California Independent System Operator \nCorporation (“CAISO”) Open Access Transmission Tariff (“CAISO Tariff”); \nWHEREAS, Eligible Customer is eligible to take transmission service under the CAISO \nTariff and does or will take such service on behalf of the Large Load Customer, whether or not \nEligible Customer owns or operates an electric distribution system; \nWHEREAS, Eligible Customer and Transmission Owner are parties to, or are entering \ninto, an Eligible Customer for Large Load (“ECLL”) Interconnection Agreement or \nTransmission System Wholesale Load (“TSWL”) Interconnection Agreement (each, an \n“Interconnection Agreement”) concerning the Large Load Facility; \nWHEREAS, Large Load Customer owns, operates, or proposes to develop the Large \nLoad Facility identified in Schedule 1; \nWHEREAS, the Eligible Customer has submitted an ECLL Interconnection Application \nor TSWL Interconnection Application for the interconnection of the Large Load Facility as a \nnew or incremental load; \nWHEREAS, Eligible Customer intends to procure transmission service pursuant to the \nCAISO Tariff and its associated schedules on behalf of Large Load Customer; \nWHEREAS, in connection with the Large Load Facility, Transmission Owner must \nmake additions and/or modifications to its transmission system, including the Large Load-Driven \nUpgrades identified in Schedule 1; \n \nWHEREAS, CAISO may, under the CAISO Tariff or a Commission-accepted \nmethodology, formally assign to the Large Load Facility a specific share of the costs or revenue \nrequirement of a regional transmission project, and the Parties intend this Agreement to address"},{"page":288,"startToken":107971,"endToken":108378,"text":"2 \n \nthat assigned share without changing any allocation otherwise established under the CAISO \nTariff; \nWHEREAS, the applicable studies may identify impacts on transmission systems other \nthan DesertLink’s transmission system and may identify Affected System Upgrades necessary to \naccommodate or mitigate such impacts; \n \nWHEREAS, Eligible Customer is responsible for entering into and maintaining the \narrangements, payment obligations, and financial security or credit support required by each \napplicable Affected System Owner to ensure that costs and financial risks associated with \nAffected System Upgrades are not shifted to customers that did not cause those costs; \nWHEREAS, Transmission Owner, Eligible Customer, and Distribution Utility have \nexecuted or expect to execute an engineering and procurement agreement and/or an \nInterconnection Agreement governing the design, construction, and interconnection of the \nTransmission Owner’s facilities to the Distribution Utility’s facilities, including the Network \nUpgrades, required to support service of the Large Load Facility; \nWHEREAS, the Parties enter into this Agreement to establish the Eligible Customer’s \nwholesale revenue-support and security obligations associated with the Large Load Facility and \nthe Large Load-Driven Upgrades, without establishing or prescribing the retail rates, charges, or \nrecovery arrangements between Eligible Customer and Large Load Customer; \nWHEREAS, the Commission has recognized that the framework under which CAISO \nprovides transmission service is unique and that certain responsibilities fall to the Participating \nTransmission Owners, Cal. Indep. Sys. Operator Corp., 195 FERC ¶ 61,214, at P 37 (2026), and \nthis Agreement is the form of agreement established under Sections 10.9 and 10A.6 of the TO \nTariff to secure Eligible Customer’s minimum contribution toward Transmission Owner’s \ntransmission revenue requirement; \nWHEREAS, CAISO is not a party to this Agreement; this Agreement does not create \nany obligation of CAISO, including any obligation to provide settlement, metering, billing, \nresettlement, or allocation data, which arises, if at all, under the CAISO Requirements; and \nDesertLink shall recover the costs of the Covered Upgrades through its Formula Rate and shall \nflow TRBAA Credits, including any adjustment resulting from the resolution of a dispute under \nthis Agreement, through to transmission customers through its TRBAA; \nNOW, THEREFORE, in consideration of the mutual promises and covenants set forth \nherein, and for other good and valuable consideration, the receipt and sufficiency of which are \nhereby acknowledged, the Parties intending to be legally bound, agree as follows:  \n1. Recitals. The statements set forth in the recitals above are hereby incorporated herein into \nthe terms and conditions of this Agreement as if fully set forth herein."},{"page":289,"startToken":108378,"endToken":108778,"text":"3 \n \n2. Definitions \nCapitalized terms not defined herein have the meanings given in the CAISO Tariff, the \nDesertLink TO Tariff Formula Rate Implementation Protocols in Appendix IV of the TO \nTariff (“Protocols”), or the relevant Interconnection Agreement. \n2.1. \n“Affected System” means an electric transmission system, other than DesertLink’s \ntransmission system, that an applicable study determines may be materially affected \nby the interconnection or service of the Large Load Facility, including the \ntransmission system of another Participating TO or a transmission system outside the \nCAISO Controlled Grid. \n2.2. \n“Affected System Arrangement” means an executed agreement or other binding \narrangement entered into by Eligible Customer with an Affected System Owner that \nestablishes the applicable study, engineering, design, procurement, construction, \nownership, cost responsibility, cancellation-cost, revenue-support, payment, financial \nsecurity or credit support, true-up, and other obligations associated with an Affected \nSystem Upgrade. \n2.3. \n“Affected System Owner” means the owner or operator responsible for an Affected \nSystem. \n2.4. \n“Affected System Upgrade” means an addition, modification, or upgrade to an \nAffected System that an applicable study determines is necessary to accommodate or \nmitigate an impact caused, in whole or in part, by the interconnection or service of the \nLarge Load Facility. \n2.5. \n“Annual MTRC” means the annual Minimum Transmission Revenue Contribution \nfor a Covered Upgrade, calculated solely under the MTRC Calculation Template in \nSchedule 5. Before the Final MTRC Determination Date for a Covered Upgrade, the \nAnnual MTRC is the Estimated Annual MTRC. On and after that date, it is the Final \nAnnual MTRC fixed under Section 6.3. Each Annual MTRC is levelized over a twenty \n(20)-year MTRC Term beginning on the applicable Upgrade In-Service Date or \nRegional Project In-Service Date, as applicable. The Annual MTRC is not an input to, \nor calculation made under, DesertLink’s annual Formula Rate update. \n2.6. \n“Annual Termination Fee Credit” means the annual amount of a Termination Fee \nBalance included in the TRBAA under Section 3.3.4. \n2.7. \n“Applicable Allocation Percentage” has the meaning set forth in Section 6.3.3. \n2.8. \n“Applicable Laws and Regulations” means all duly promulgated applicable federal, \nstate, and local laws, regulations, rules, ordinances, codes, decrees, judgments, \ndirectives, judicial or administrative orders, permits, and other duly authorized actions \nof any Governmental Authority. \n2.9. \n“Applied Security Proceeds” means proceeds of Operational Security that \nTransmission Owner has applied under Section 7.6 to an identified Supplemental"},{"page":290,"startToken":108778,"endToken":109201,"text":"4 \n \nMTRC, prior-period true-up adjustment, Termination Fee, or other payment obligation \narising under Article 6 or Section 3.3.4. Proceeds of Construction Security applied to \nPre-In-Service Termination Costs or other construction-related obligations are not \nApplied Security Proceeds and shall be treated as provided in Sections 3.3.2 and 3.3.3. \n2.10. “ARR” means annual revenue requirement. \n2.11. “Break-Even” has the meaning set forth in Section 6.7. \n2.12. “Business Day” means a Business Day as defined in Appendix A to the CAISO Tariff, \nas amended from time to time. \n2.13. “CAISO-Assigned Regional Project” means a regional transmission project \napproved or designated through a CAISO Tariff process for which CAISO, under the \nCAISO Tariff or a Commission-accepted methodology, formally assigns a specific \npercentage or amount of project costs or revenue requirement to the Large Load \nFacility. The project and assignment must be identified in Schedule 4. A project’s \nregional designation, general system benefit, or inclusion in a CAISO transmission \nplan, without a specific assignment to the Large Load Facility, does not by itself make \nthe project a CAISO-Assigned Regional Project. \n2.14. “CAISO Requirements” means the CAISO Tariff, the Transmission Control \nAgreement, any other agreement to which CAISO is a party that is on file with or \naccepted by the Commission, and any Commission order, regulation, or Commission-\naccepted methodology applicable to CAISO, each as amended from time to time, \ntogether with any CAISO business practice manual or procedure to the extent it \nimplements any of the foregoing. \n2.15. “Calendar Day” means every day, including Saturdays, Sundays, federal holidays, \nand other holidays. \n2.16. “Construction Security” has the meaning set forth in Section 7.1.  \n2.17. “Covered Upgrade” means each Large Load-Driven Upgrade and each DesertLink-\nowned CAISO-Assigned Regional Project share that is included in Schedule 1 or \nSchedule 4, as applicable, and for which an Annual MTRC is established under this \nAgreement. \n2.18. “Credit Review Event” means a payment default, credit rating downgrade of the \nEligible Customer or an issuing bank that has not yet triggered a Material Adverse \nCredit Event, a notice of nonrenewal of a Letter of Credit, or another event that, in \nDesertLink’s reasonable judgment, warrants updated credit information. A Credit \nReview Event does not, by itself, require delivery of additional Security absent a \nresulting shortfall. \n2.19. “Cumulative Revenue Ledger” means the customer-, Large Load Facility-, project-, \nand Covered Upgrade-specific record maintained by DesertLink under Section 6.7. \nThe Cumulative Revenue Ledger shall identify the applicable Total Required Revenue"},{"page":291,"startToken":109201,"endToken":109603,"text":"5 \n \nCommitment, Annual MTRC, Qualifying Transmission Revenues, Supplemental \nMTRC Receipts, Applied Security Proceeds, effective prospective reassignments, \nother permitted adjustments, and the resulting Remaining Cumulative Revenue \nResponsibility and Required Operational Security. \n2.20. “Cumulative Revenue Responsibility” or “Remaining Cumulative Revenue \nResponsibility” means the Total Required Revenue Commitment less amounts that \nhave satisfied that commitment under Section 6.7. \n2.21. “Dispute Determination” has the meaning set forth in Section 11.5. \n2.22. “Distribution Utility” means the public utility, municipal utility, cooperative, or other \nentity that owns, operates, or is responsible for the distribution facilities to which the \nLarge Load Facility is interconnected or proposed to be interconnected, including its \nsuccessors and permitted assigns. \n2.23. “Effective Date” has the meaning set forth in Section 3.1. \n2.24. “Estimated Annual MTRC” means the annual MTRC for a Covered Upgrade \ncalculated from the then-current estimated capital cost using the MTRC Calculation \nTemplate in Schedule 5. DesertLink may update the Estimated Annual MTRC as costs \nchange during construction, including when DesertLink requires additional \nConstruction Security. \n2.25. “Event of Default” has the meaning set forth in Section 7.11. \n2.26. “Final Annual MTRC” means the fixed Annual MTRC for a Covered Upgrade \nestablished on the Final MTRC Determination Date using final incurred capital cost \nand the Project-Specific Levelized Fixed Charge Rate calculated under the MTRC \nCalculation Template in Schedule 5, including the agreed five percent (5%) annual \nlevelized-depreciation schedule over the twenty (20)-year MTRC Term. The Final \nAnnual MTRC is not recalculated through DesertLink’s Formula Rate or Protocols \nand may be recalculated only as provided in Section 6.3.1. \n2.27. “Final MTRC Determination Date” means the date on which DesertLink establishes \nthe Final Annual MTRC for a Covered Upgrade, which shall occur within one (1) year \nafter the applicable Covered Upgrade enters service, when the actual capital cost of \nthat Covered Upgrade is known and all costs associated with its estimated capital cost \nhave been accounted for. \n2.28. “Force Majeure” means any cause beyond the reasonable control of the Party \nclaiming, and without the fault or negligence of such Party, which materially prevents \nor impairs the performance of such Party’s obligations hereunder, including but not \nlimited to landslides, storms, ice storms, flood, drought, tornado, hurricane, lightning, \nearthquake, fire, explosion, failure or imminent threat of failure of facilities, supply \nchain issues, civil disturbance, strike, or other labor disturbance, sabotage, vandalism,"},{"page":292,"startToken":109603,"endToken":110044,"text":"6 \n \nriot, terrorism, blockade, insurrection, war, national emergency, or restraint by any \nGovernmental Authority. \n2.29. “Forecast TRBAA Credit” has the meaning set forth in Section 6.8. \n2.30. “Formula Rate” means DesertLink’s transmission formula rate template and \nassociated provisions in the TO Tariff, as accepted by the Commission and amended \nfrom time to time. \n2.31. “Governmental Authority” means any federal, state, local, or other governmental, \nregulatory, or administrative agency, court, commission, department, board, \nlegislature, rulemaking body, tribunal, or other governmental authority having \njurisdiction over a Party, the Large Load Facility, any Large Load-Driven Upgrade, or \nthe services or obligations addressed by this Agreement. \n2.32. “Initial Allocation Percentage” has the meaning set forth in Section 6.3.2. \n2.33. “Large Load-Driven Upgrades” means the transmission facilities owned or to be \nconstructed by DesertLink and identified in Schedule 1 that the applicable study \ndetermines are driven in whole or in part by the Large Load Facility, alone or together \nwith one or more other large loads. Large Load-Driven Upgrades do not include \nAffected System Upgrades or any facilities whose costs are directly assigned to and \npaid by Eligible Customer under an Interconnection Agreement and are not included \nin DesertLink’s rate base. Where a Large Load-Driven Upgrade is an addition to or \nmodification of a facility jointly owned by DesertLink and another entity, the Large \nLoad-Driven Upgrade includes only DesertLink’s ownership share identified in \nSchedule 1. \n2.34. “Large Load Facility” means the new or incremental load facility owned, operated, \nor proposed to be developed by Large Load Customer and identified in Schedule 1. \n2.35. “Large Load Service Commencement Date” means the date on which the Large \nLoad Facility first takes electric service through the CAISO Controlled Grid or \notherwise begins receiving service under the applicable CAISO Tariff arrangement, as \nspecified in Schedule 1. If the Large Load Facility is not reflected in a CAISO billing \ndeterminant used to assess TAC, Schedule 2 shall identify the applicable wholesale \ntransmission-access, wheeling, or other CAISO Tariff billing arrangement. \n2.36. “Letter of Credit” means an irrevocable, transferable standby letter of credit issued \nfor the benefit of DesertLink, meeting the requirements of Schedule 3. \n2.37. “Material Adverse Credit Event” means any of the following: (a) a bankruptcy, \ninsolvency, receivership, or similar event described in Section 7.6(e); (b) a reduction \nin the long-term senior unsecured debt rating of the Eligible Customer or an issuing \nbank below the standards set out in Section 4 of Schedule 3; (c) loss, cancellation, \nmaterial impairment, or expiration of Qualifying Retail Security Support without \ntimely replacement; (d) an incorrect, expired, withdrawn, unavailable, or materially"},{"page":293,"startToken":110044,"endToken":110471,"text":"7 \n \nmisleading Retail Security Certification, as described in Section 7.7 of this Agreement; \nor (e) another event that, in DesertLink’s reasonable judgment, materially impairs \nEligible Customer's ability to perform its payment or Security obligations under this \nAgreement. \n2.38. “MTRC Term” means, with respect to each Covered Upgrade, the period beginning \non and including the applicable Upgrade In-Service Date or Regional Project In-\nService Date, as applicable, and ending on the day immediately preceding the \ntwentieth (20th) anniversary of that in-service date (the “MTRC Term End Date”). The \nfirst and final Rate Years of the MTRC Term shall be prorated for partial-year service. \n2.39. “MTRC Term End Date” has the meaning set forth in the definition of “MTRC \nTerm.” \n2.40. “Net Revenue Requirement” means DesertLink’s Net Annual Transmission Revenue \nRequirement calculated under its Formula Rate for the applicable Rate Year. \n2.41. “Notice of Dispute” has the meaning set forth in Section 11.1. \n2.42. “Operational Security” has the meaning set forth in Sections 7.2 and 7.5. \n2.43. “Outside Date” means the date identified as the Outside Date in Schedule 1, as such \ndate may be extended by written agreement of the Parties. \n2.44. “Pre-In-Service Termination Costs” has the meaning set forth in Section 3.3.2. \n2.45. “Qualifying Retail Security Support” means retail-customer security for which \nEligible Customer has delivered a currently effective Retail Security Certification \nunder Schedule 3. \n2.46. “Qualifying Transmission Revenues” or “QTR” has the meaning set forth in Section \n6.2.  \n2.47. “Reconciliation Statement” has the meaning set forth in Section 6.6. \n2.48. “Regional Project Allocated ARR” means, for the share of a CAISO-Assigned \nRegional Project that is owned by DesertLink, included in DesertLink’s Formula Rate, \nand formally allocated to the Large Load Facility under the applicable CAISO Tariff \nprovision or Commission-accepted methodology, the Annual MTRC for that project \nshare calculated under Section 6.3.5 and the MTRC Calculation Template in Schedule \n5, which shall be the Estimated Annual MTRC before the Final MTRC Determination \nDate and the Final Annual MTRC on and after that date. The Regional Project \nAllocated ARR is calculated using DesertLink’s allocated share of the project’s \nestimated or final capital cost, as applicable, by applying the Project-Specific \nLevelized Fixed Charge Rate calculated under Schedule 5. For purposes of calculating \npresent-worth federal and state income-tax depreciation benefits, Schedule 5 applies a \nlevelized-depreciation rate of five percent (5%) of that allocated capital-cost share in \neach year of the applicable twenty (20)-year MTRC Term. The resulting Regional"},{"page":294,"startToken":110471,"endToken":110833,"text":"8 \n \nProject Allocated ARR shall be recorded in Schedule 4. If CAISO states the \nassignment as an annual revenue-requirement share rather than a capital-cost amount, \nthe equivalent capital-cost input shall be determined only under the allocation method \nestablished by the CAISO Tariff or a Commission-accepted methodology. \n2.49. “Regional Project In-Service Date” means, for a CAISO-Assigned Regional Project \nowned by DesertLink, the date the project, or a separately identifiable and separately \nallocated portion of it, is energized, placed in service, and recorded as electric plant in \nservice on DesertLink’s books. Schedule 4 shall identify the expected Regional Project \nIn-Service Date for each project or separately identifiable portion. Inclusion of \nConstruction Work in Progress in rate base before that date does not constitute a \nRegional Project In-Service Date. \n2.50. “Required Operational Security” means the amount of Operational Security required \nunder Section 7.3 and Schedule 3, equal to the nominal Remaining Cumulative \nRevenue Responsibility except to the extent satisfied by Qualifying Retail Security \nSupport. \n2.51. “Required Security Amount” means the aggregate Security then required under this \nAgreement. \n2.52. “Retail Security Certification” means a certification substantially in the form of \nExhibit A contained in Schedule 3 of this Agreement, signed by an authorized officer \nof Eligible Customer, confirming that the Large Load Customer has posted retail \nsecurity with Eligible Customer that is available, through enforceable draw or \napplication rights or a binding undertaking, to satisfy the corresponding wholesale \nobligations under this Agreement. \n2.53. “Security” means Construction Security or Operational Security, as the context \nrequires.  \n2.54. “Security Notice” means DesertLink’s written notice of a required increase, \nrestoration, replacement, or other adjustment to Security, including reasonable \nsupporting detail then available. \n2.55. “Successor Eligible Customer” means an Eligible Customer that assumes \nresponsibility under Section 6.10. \n2.56. “Supplemental MTRC” has the meaning set forth in Section 6.4. \n2.57. “Supplemental MTRC Receipts” means payments of Supplemental MTRC received \nby Transmission Owner from or on behalf of Eligible Customer, excluding Applied \nSecurity Proceeds. \n2.58. “TAC” means the Transmission Access Charge, as defined in Appendix A to the \nCAISO Tariff, including the applicable Access Charge components identified in \nSchedule 2."},{"page":295,"startToken":110833,"endToken":111282,"text":"9 \n \n2.59. “Termination Cost Reconciliation” has the meaning set forth in Section 3.3.2. \n2.60. “Termination Fee” has the meaning set forth in Section 3.3.4. \n2.61. “Termination Fee Account” has the meaning set forth in Section 3.3.4.  \n2.62. “Termination Fee Balance” has the meaning set forth in Section 3.3.4. \n2.63. “Total Required Revenue Commitment” has the meaning set forth in Section 6.7. \n2.64. “Transmission Revenue Balancing Account Adjustment” or “TRBAA” means the \nTransmission Revenue Balancing Account Adjustment maintained by DesertLink \nunder Section 5.5 of the TO Tariff, as amended from time to time, and “Transmission \nRevenue Balancing Account” or “TRBA” means the associated balancing account \nmaintained under that Section. \n2.65. “TRBAA Credit” means a Forecast TRBAA Credit or an amount recorded in the \nTRBA under Section 6.8 for Supplemental MTRC Receipts, Applied Security \nProceeds other than Applied Security Proceeds applied to a Termination Fee, Annual \nTermination Fee Credits, or a duplicate-recovery credit under Section 3.3.3(d) or \nSection 6.3.5, in each case as flowed through to transmission customers through the \nTRBAA. A TRBAA Credit is not an input to the MTRC Calculation Template or the \nFormula Rate. \n2.66. “Upgrade In-Service Date” means, with respect to each Large Load-Driven Upgrade, \nthe date on which that Large Load-Driven Upgrade is energized, placed in service, and \nincluded as Electric Plant in Service in DesertLink’s rate base. Schedule 1 shall \nidentify the expected Upgrade In-Service Date for each Large Load-Driven Upgrade. \nInclusion of Construction Work in Progress in rate base before an upgrade is placed in \nservice does not constitute its Upgrade In-Service Date. \n3. Effective Date, Term and Termination \n3.1. \nEffective Date. This Agreement shall become effective upon execution by the Parties, \nsubject to acceptance by the Federal Energy Regulatory Commission (“FERC” or \n“Commission”) (if applicable), or, if filed unexecuted, upon the date specified by \nFERC (the “Effective Date”). \n3.2. \nTerm. This Agreement shall remain in effect from the Effective Date until DesertLink \nissues a final Reconciliation Statement determining that the Total Required Revenue \nCommitment for every Covered Upgrade has been satisfied, transferred to a successor, \nprospectively reassigned, or otherwise discharged. The MTRC Term for each Covered \nUpgrade begins on its applicable Upgrade In-Service Date or Regional Project In-\nService Date and ends on its applicable MTRC Term End Date. Earlier Break-Even \nremains available if the Total Required Revenue Commitment is satisfied before the \napplicable MTRC Term End Date. If DesertLink holds a Termination Fee Balance \nwhen the Total Required Revenue Commitment is otherwise discharged, this \nAgreement shall remain in effect for purposes of the Termination Fee Account"},{"page":296,"startToken":111282,"endToken":111729,"text":"10 \n \nprovisions in Section 3.3.4 until the Termination Fee Balance has been fully credited \nor released. \n3.3. \nTermination. This Agreement may be terminated as follows:  \n3.3.1. \nTermination Before the First Applicable In-Service Date. Before any Large \nLoad-Driven Upgrade reaches its Upgrade In-Service Date and before any \nDesertLink-owned CAISO-Assigned Regional Project reaches its Regional \nProject In-Service Date, this Agreement may be terminated upon thirty (30) \nCalendar Days’ written notice if: (a) the Large Load Service Commencement \nDate has not occurred by the Outside Date; (b) Eligible Customer or Large Load \nCustomer cancels or abandons the Large Load Facility or associated request for \nservice; (c) the applicable interconnection, access to the CAISO Controlled Grid, \nor other arrangement necessary for the Large Load Facility is terminated; (d) an \nEvent of Default has occurred and is continuing, or DesertLink exercises a \ntermination right arising from default under this Agreement or an applicable \ninterconnection or transmission service agreement; or (e) Eligible Customer fails \nto timely execute, maintain, or provide the documentation, financial security, or \ncredit support required under Sections 4.2, 6.3.6, or 7.1, and such failure \ncontinues for ten (10) Business Days after written notice from DesertLink or \ncannot reasonably be cured by the date on which DesertLink must commence or \ncontinue physical construction or incur a material noncancelable procurement or \nconstruction commitment. Any such termination shall be subject to Applicable \nLaws and Regulations and any required Commission authorization or acceptance \nand shall not release or limit the obligations described in Sections 3.3.2 and \n3.3.3.  \nIf any Large Load-Driven Upgrade has reached its Upgrade In-Service Date or \nany DesertLink-owned CAISO-Assigned Regional Project has reached its \nRegional Project In-Service Date identified in Schedule 4, cancellation, \nabandonment, termination, or failure of the Large Load Facility to commence or \ncontinue service shall not terminate this Agreement. Section 3.3.4 and Articles 6 \nand 7 shall apply to each Large Load-Driven Upgrade and DesertLink-owned \nCAISO-Assigned Regional Project for which the applicable in-service date has \noccurred. Section 6.3.6 shall govern any assigned share of a project owned by \nanother entity. \n3.3.2. \nPre-In-Service Termination Costs and Construction Security. If the Large \nLoad Facility, its associated request for service, or any associated Large Load-\nDriven Upgrade is cancelled, abandoned, or otherwise terminated before an \napplicable Large Load-Driven Upgrade reaches its Upgrade In-Service Date, \nEligible Customer shall be responsible for all actual and reasonable costs \nprudently incurred or irrevocably committed by DesertLink with respect to that \nLarge Load-Driven Upgrade that have not otherwise been recovered by \nDesertLink (“Pre-In-Service Termination Costs”). Pre-In-Service Termination \nCosts include costs incurred before or after the applicable cancellation,"},{"page":297,"startToken":111729,"endToken":112117,"text":"11 \n \nabandonment, or termination to wind down, secure, remove, or otherwise address \nthe unfinished Large Load-Driven Upgrade. \nPre-In-Service Termination Costs include, as applicable: \n(a) engineering, design, study, permitting, environmental, siting, land and land-\nright, procurement, construction, testing, project management, legal, \nregulatory, and administrative costs; \n(b) vendor and contractor cancellation charges, termination charges, change-\norder costs, restocking charges, demobilization costs, contract closeout costs, \nand third-party claims; \n(c) the costs of securing, preserving, mothballing, relocating, redeploying, \ndismantling, removing, transporting, storing, selling, or disposing of \nequipment, materials, and partially completed facilities; \n(d) site restoration, environmental remediation, and the restoration or \nmodification of DesertLink’s existing facilities made necessary by the \ncancellation or abandonment; \n(e) Allowance for Funds Used During Construction (“AFUDC”) properly \naccrued in accordance with the Commission’s Uniform System of Accounts \nthrough the date on which the applicable construction activities cease or the \napplicable project is determined to have been abandoned, excluding AFUDC \nassociated with amounts of Construction Work in Progress included in rate \nbase or otherwise recovered through rates; and \n(f) any other costs reasonably incurred by DesertLink as a direct result of the \ncancellation, abandonment, suspension, or termination. \nDesertLink may draw upon and apply Construction Security to Pre-In-Service \nTermination Costs as such costs are incurred or the associated obligations \nbecome fixed and payable. DesertLink may retain Construction Security until all \nPre-In-Service Termination Costs are reasonably determinable and DesertLink \nhas served on Eligible Customer a final statement reconciling Pre-In-Service \nTermination Costs, Construction Security applied, and the recoveries described \nin this Section, together with supporting information (the “Termination Cost \nReconciliation”). Construction Security does not limit Eligible Customer’s \nunderlying liability. Eligible Customer shall pay any deficiency within ten (10) \nBusiness Days after receipt of the Termination Cost Reconciliation. The \nTermination Cost Reconciliation shall become final in the same manner and \nwithin the same period as a Reconciliation Statement under Section 6.6, and \nDesertLink shall release any excess Construction Security after the Termination \nCost Reconciliation becomes final, including through resolution of any dispute \nunder Article 11. Construction Security applied under this Section does not \nconstitute Applied Security Proceeds and does not produce a TRBAA Credit \nexcept to the extent provided in Section 3.3.3(d). Nothing in this Agreement \nlimits DesertLink’s right to seek recovery of unpaid Pre-In-Service Termination \nCosts through its Formula Rate or otherwise as the Commission may authorize."},{"page":298,"startToken":112117,"endToken":112548,"text":"12 \n \nDesertLink shall use commercially reasonable efforts to mitigate Pre-In-Service \nTermination Costs, provided that DesertLink shall not be required to take any \naction inconsistent with prudent utility practice, safety requirements, Applicable \nLaws and Regulations, existing contractual obligations, or the reliable operation \nof its transmission facilities. The Termination Cost Reconciliation shall reflect, \nwhen realized, applicable vendor refunds, insurance recoveries, net salvage \nproceeds, reuse or redeployment credits, and other recoveries attributable to the \ncancelled or abandoned scope, but shall not credit amounts representing \nDesertLink’s lawfully earned return or carrying costs except to the extent \nnecessary to prevent duplicate recovery. \nThis Section applies separately to each Large Load-Driven Upgrade. If one or \nmore Large Load-Driven Upgrades have reached their Upgrade In-Service Dates \nwhen the Large Load Facility or associated request for service is cancelled, this \nSection shall apply only to the Large Load-Driven Upgrades and portions of the \nproject that have not reached their Upgrade In-Service Dates. The treatment of \neach Large Load-Driven Upgrade that has reached its Upgrade In-Service Date \nshall be governed by Section 3.3.4 and Articles 6 and 7. \n3.3.3. \nRate Base and Formula Rate Treatment Before an Upgrade In-Service \nDate. To the extent costs associated with a cancelled or abandoned Large Load-\nDriven Upgrade that has not reached its Upgrade In-Service Date have been \nincluded in Construction Work in Progress or any other component of \nDesertLink’s rate base, DesertLink shall, consistent with the Commission’s \nUniform System of Accounts, its Formula Rate and Protocols, and other \nApplicable Laws and Regulations: \n(a) remove, reclassify, or otherwise exclude such costs from rate base to the \nextent required by applicable Commission accounting and ratemaking \nrequirements; \n(b) reflect that treatment in the next practicable Annual Update and \ncorresponding true-up; \n(c) cease accruing AFUDC to the extent and at the time required by the \nCommission’s accounting requirements; and \n(d) make any adjustment or credit necessary to prevent DesertLink from \nrecovering the same cost both through Construction Security or another \npayment by Eligible Customer and through its Formula Rate; provided that \nany such credit to transmission customers shall be recorded in the TRBA and \nflowed through to transmission customers through the TRBAA as provided \nin Section 6.8, and not through a revenue credit or other input to the Formula \nRate. \nAny depreciation, amortization, or other amount recovered through DesertLink’s \nFormula Rate that represents recovery of the same underlying capital or expense \nincluded in Pre-In-Service Termination Costs shall be reflected, without \nduplication, in the Termination Cost Reconciliation under Section 3.3.2. \nApplication of Construction Security shall not require DesertLink to refund or"},{"page":299,"startToken":112548,"endToken":112940,"text":"13 \n \nsurrender any return, carrying cost, tax allowance, or other amount lawfully \nrecovered for a period during which DesertLink’s investment was properly \nincluded in rate base, except to the extent necessary to prevent duplicate \nrecovery. \nThis Section 3.3.3 applies only to a Large Load-Driven Upgrade, or portion \nthereof, that has not reached its Upgrade In-Service Date. \n3.3.4. \nEffect of Cancellation After an Upgrade or Regional Project In-Service \nDate. After any Large Load-Driven Upgrade reaches its Upgrade In-Service \nDate or any DesertLink-owned CAISO-Assigned Regional Project reaches its \nRegional Project In-Service Date specified in Schedule 4, Eligible Customer \nshall promptly notify DesertLink if Eligible Customer or Large Load Customer \nanticipates or becomes aware of the cancellation, abandonment, downsizing, \ncurtailment, permanent cessation, or material reduction of service at the Large \nLoad Facility. \nCancellation, abandonment, suspension, downsizing, termination, or failure of \nthe Large Load Facility to commence or continue service shall not, by itself: \n(a) terminate this Agreement; \n(b) require the removal from rate base of a Large Load-Driven Upgrade or a \nDesertLink-owned CAISO-Assigned Regional Project that has reached its in-\nservice date; \n(c) reduce or cap any Annual MTRC, Regional Project Allocated ARR, Total \nRequired Revenue Commitment, or remaining Cumulative Revenue \nResponsibility; or \n(d) terminate, reduce, or excuse Eligible Customer’s obligation to pay the \nSupplemental MTRC and prior-period true-up adjustments under Section 6.6, \nmaintain and replenish Operational Security, or satisfy the remaining \nCumulative Revenue Responsibility. \nUpon any effective termination of this Agreement, or upon the permanent \ncessation of service by the Large Load Facility following an applicable Upgrade \nIn-Service Date or Regional Project In-Service Date, Eligible Customer shall pay \nDesertLink a one-time lump-sum termination fee equal to the Remaining \nCumulative Revenue Responsibility, less any Supplemental MTRC that has been \nbilled and remains unpaid as of the effective termination or cessation date (the \n“Termination Fee”). DesertLink shall calculate the Termination Fee separately \nfor each Covered Upgrade that has reached its applicable in-service date from the \nmost recently served Cumulative Revenue Ledger, updated through the effective \ntermination or cessation date for then-known Qualifying Transmission Revenues, \nSupplemental MTRC Receipts, Applied Security Proceeds, billed and unpaid \nSupplemental MTRC, and any effective prospective reassignment. Billed and \nunpaid Supplemental MTRC excluded from the Termination Fee remains \nseparately payable and secured; its later payment, satisfaction through Applied \nSecurity Proceeds, or direct recovery shall reduce the Cumulative Revenue"},{"page":300,"startToken":112940,"endToken":113413,"text":"14 \n \nResponsibility. The Termination Fee is due thirty (30) Calendar Days after \nDesertLink’s invoice. It is an accelerated contractual termination charge, not a \npenalty or consideration for future transmission service. Its receipt in full \ndischarges only the remaining Cumulative Revenue Responsibility included in \nthe fee. The Termination Fee is not a Supplemental MTRC Receipt, Applied \nSecurity Proceeds, prepayment for future transmission service, customer advance \nfor construction, contribution in aid of construction, or reduction to rate base. \nDesertLink shall administer the Termination Fee only as provided in Section \n3.3.4 and Article 6. \nEach Large Load-Driven Upgrade that has reached its Upgrade In-Service Date \nand each DesertLink-owned CAISO-Assigned Regional Project for which an \nAnnual MTRC has been established shall remain subject to the applicable \nFormula Rate and Protocols for so long as it is properly includable in rate base \nunder applicable Commission requirements. The associated payment, Security, \nreconciliation, and TRBAA Credit obligations shall continue in accordance with \nArticles 6 and 7, subject to any prospective reassignment or adjustment \nauthorized under the CAISO Tariff or a Commission-accepted methodology, or \ntransfer to a Successor Eligible Customer under Section 6.10. \nDesertLink shall hold each Termination Fee, and any proceeds of Operational \nSecurity applied to its payment, in a separately identified, interest bearing \nTermination Fee Account for the applicable Covered Upgrade. The amounts in \nthat account, together with actual earnings and less amounts credited or released, \nconstitute the “Termination Fee Balance.” For each Covered Upgrade, the \nAnnual Termination Fee Credit for each Rate Year remaining in the MTRC \nTerm shall equal the applicable Annual MTRC, prorated for any partial Rate \nYear, but shall not exceed the then-available Termination Fee Balance. In the \nfinal Rate Year of the MTRC Term, the Annual Termination Fee Credit shall \ninclude the entire remaining Termination Fee Balance, including actual earnings, \nso that the Termination Fee Account is reduced to zero, subject to any amount \nrequired to be released under this Section 3.3.4. DesertLink shall include each \nAnnual Termination Fee Credit in the TRBAA only for the Rate Year for which \nit is scheduled. The Termination Fee Balance shall be separately accounted for as \na deferred liability pending its scheduled annual TRBAA treatment, shall not be \nincluded in rate base, and shall not itself be a TRBAA Credit or Formula Rate \ninput. If a prospective reassignment becomes effective after receipt of a \nTermination Fee, DesertLink shall release the portion of the Termination Fee \nBalance attributable to the reassigned responsibility, together with actual \nearnings, and prospectively adjust the remaining Annual Termination Fee \nCredits. \nIf the Commission subsequently requires DesertLink to retire, remove, reclassify, \nor exclude all or a portion of an in-service Large Load-Driven Upgrade or \nDesertLink-owned CAISO-Assigned Regional Project from rate base, \nDesertLink shall make corresponding prospective adjustments to the applicable \nAnnual MTRC, Regional Project Allocated ARR, Total Required Revenue"},{"page":301,"startToken":113413,"endToken":113853,"text":"15 \n \nCommitment, Cumulative Revenue Responsibility, Supplemental MTRC, and \nOperational Security. Such adjustments shall prevent Eligible Customer from \nremaining responsible under this Agreement for costs that are no longer included \nin DesertLink’s transmission revenue requirement, without requiring a refund or \nreopening of amounts properly determined for a prior Rate Year. \nIf, at the time of cancellation or abandonment, one or more Large Load-Driven \nUpgrades have reached their Upgrade In-Service Dates or a DesertLink-owned \nCAISO-Assigned Regional Project has reached its project in-service date, and \none or more other upgrades or project shares have not, Sections 3.3.2 and 3.3.3 \nshall apply to Large Load-Driven Upgrades and project scope that have not \nreached their applicable in-service dates; this Section 3.3.4 and Articles 6 and 7 \nshall apply to the upgrades and DesertLink-owned project shares that have \nreached their applicable in-service dates; and Section 6.3.6 shall continue to \ngovern any assigned share of a project owned by another entity. \n3.3.5. \nMutual Termination. The Parties may terminate this Agreement by mutual \nwritten consent only after addressing all incurred construction costs, the \ncontinuing Cumulative Revenue Responsibility, Supplemental MTRC amounts, \nprior-period true-up adjustments, and Security. No termination is effective to \nextinguish such obligations unless expressly accepted or approved by FERC. \n3.4. \nRegulatory Effect of Termination. No termination shall become effective until the \nParties comply with all Applicable Laws and Regulations, including any required \nnotice to or acceptance by FERC. A regulatory rejection, cancellation, downsizing, \ncurtailment, cessation, Force Majeure event, or termination shall not excuse incurred \nconstruction costs or the obligations arising on or after an applicable Upgrade In-\nService Date or Regional Project In-Service Date unless FERC expressly determines \notherwise. \n3.5. \nEffect of Termination. Termination does not release Eligible Customer from \nobligations arising under Articles 4, 6, or 7, including future annual Supplemental \nMTRC payments, prior-period true-up adjustments, and Security maintenance and \nreplenishment, until the Cumulative Revenue Responsibility is finally satisfied or \ntransferred in accordance with this Agreement. Upon DesertLink’s receipt of the \nTermination Fee in full, no further Supplemental MTRC shall accrue for any period \nafter the effective termination or cessation date, subject to final true-ups and \nreconciliation for periods before that date. Security does not limit the underlying \nliability. The Large Load Customer’s information, notice, authorization, and \ncooperation obligations stated in its Limited Acknowledgment also survive.  \n4. Transmission Project \n4.1. \nDesign, Procurement, and Construction. Subject to Eligible Customer’s execution \nof this Agreement and the relevant Interconnection Agreement, delivery of \nConstruction Security under Section 7.1, and satisfaction of Section 4.2, DesertLink \nshall design, procure, construct, install, and own the Large Load-Driven Upgrades"},{"page":302,"startToken":113853,"endToken":114225,"text":"16 \n \ndescribed in the relevant Interconnection Agreement and Schedule 1, using reasonable \nefforts to meet the applicable construction schedule and expected Upgrade In-Service \nDates.  \nEligible Customer shall maintain Construction Security under Section 7.1 sufficient to \nsecure DesertLink’s incurred and committed construction costs and the Pre-In-Service \nTermination Costs described in Section 3.3.2. Construction Security shall apply \nseparately to each Large Load-Driven Upgrade until that upgrade reaches its Upgrade \nIn-Service Date and the conditions for release or conversion under Section 7.2 have \nbeen satisfied. \nIf different Large Load-Driven Upgrades reach their Upgrade In-Service Dates on \ndifferent dates, Construction Security shall continue to apply to each Large Load-\nDriven Upgrade and portion of the project that has not reached its Upgrade In-Service \nDate, notwithstanding the release or conversion of Construction Security attributable \nto an upgrade that has entered service. \nUpon cancellation, abandonment, or termination, before an applicable Large Load-\nDriven Upgrade reaches its Upgrade In-Service Date, DesertLink may draw, retain, \nand apply Construction Security in accordance with Sections 3.3.2 and 7.1 and the \nrelevant Interconnection Agreement. DesertLink shall not be required to take action \ninconsistent with its safety practices, design criteria, construction procedures, \nApplicable Laws and Regulations, or the reliable operation of its transmission \nfacilities. \n4.2. \nAffected Systems \n4.2.1. Identification and Coordination. Eligible Customer shall cooperate with \nDesertLink, CAISO, each affected Participating TO, and each other Affected \nSystem Owner in identifying and studying potential impacts of the interconnection \nor service of the Large Load Facility on any Affected System. \n4.2.2. Required Affected System Arrangements. For each Affected System Upgrade \nidentified through an applicable study, Eligible Customer shall timely enter into and \nmaintain an Affected System Arrangement with the applicable Affected System \nOwner. Each Affected System Arrangement shall address, as applicable: \n(a) study, engineering, design, procurement, construction, testing, and \nenergization responsibilities; \n(b) responsibility for the costs of the Affected System Upgrade; \n(c) responsibility for cancellation, abandonment, demobilization, equipment \nremoval, disposition, remediation, restoration, AFUDC, and other costs \nresulting from cancellation or failure of the Large Load Facility to proceed; \n(d) construction-period and post-in-service payment obligations and financial \nsecurity or credit support sufficient to protect the Affected System Owner \nand its other customers against cost shifting;"},{"page":303,"startToken":114225,"endToken":114617,"text":"17 \n \n(e) applicable invoicing, reconciliation, true-up, refund, and release procedures; \nand \n(f) any Commission filing, acceptance, or other regulatory authorization \nrequired for the Affected System Arrangement. \n4.2.3. Evidence Before DesertLink Construction. At least thirty (30) Calendar Days \nbefore DesertLink’s scheduled commencement of physical construction, and in all \nevents before any notice to proceed for physical construction may occur or \nDesertLink incurs a material noncancelable procurement or construction \ncommitment, Eligible Customer shall provide DesertLink: \n(a) a complete copy of each executed Affected System Arrangement; \n(b) evidence that all financial security or credit support required to be effective \nbefore construction under each Affected System Arrangement has been provided; \n(c) evidence of any required Commission filing, acceptance, or other regulatory \nauthorization; and \n(d) a certification that each Affected System Arrangement remains in full force and \neffect and that Eligible Customer is not in default thereunder. \nDesertLink may permit specifically identified preliminary engineering, \nprocurement, or other limited activities to proceed before satisfaction of this Section \nby written notice. Such permission shall not waive any requirement of this Section \nor obligate DesertLink to commence or continue physical construction. \n4.2.4. Continuing Obligation. Eligible Customer shall promptly provide DesertLink a \ncopy of any material amendment, replacement, termination notice, default notice, \ndemand upon financial security or credit support, or other material notice \nconcerning an Affected System Arrangement. Eligible Customer shall maintain each \nrequired Affected System Arrangement and all financial security or credit support \nrequired thereunder until the obligations secured by that arrangement have been \nfinally satisfied, transferred, or released. \n4.2.5. Later-Identified Affected Systems. If an Affected System or Affected System \nUpgrade is identified after DesertLink has commenced work, Eligible Customer \nshall promptly enter into the required Affected System Arrangement and provide the \ndocumentation required by this Section. Subject to the applicable tariffs and \nagreements, DesertLink may suspend further work, procurement, energization, or \nservice to the extent reasonably necessary to avoid additional exposure until the \nrequirement is satisfied. \n4.2.6. Failure to Satisfy Requirements. Eligible Customer’s failure to timely execute, \nmaintain, or provide evidence of an Affected System Arrangement or required \nfinancial security or credit support constitutes a material default under this \nAgreement. Subject to Applicable Laws and Regulations and the applicable tariffs \nand agreements, DesertLink may: (a) decline to commence or continue construction \nor material procurement commitments; (b) suspend work, energization, or service;"},{"page":304,"startToken":114617,"endToken":115083,"text":"18 \n \n(c) exercise the termination right in Section 3.3.1; and (d) recover all resulting Pre-\nIn-Service Termination Costs and other amounts payable under this Agreement. \n4.2.7. Confidentiality. Documents provided under this Section shall be subject to the \nconfidentiality protections in Section 6.12. Eligible Customer may redact \ncommercially sensitive provisions unrelated to the requirements of this Section, but \nmay not redact information reasonably necessary for DesertLink to verify the scope, \neffectiveness, cost responsibility, financial security or credit support, termination \nprotection, or continuing enforceability of the Affected System Arrangement. \n4.2.8. Separate Administration. Costs, revenues, payments, and financial security or \ncredit support arising under an Affected System Arrangement shall be administered \nunder that arrangement and the applicable Affected System Owner’s tariff. Such \namounts shall not be included in any Annual MTRC, Total Required Revenue \nCommitment, Supplemental MTRC, Cumulative Revenue Responsibility, or \nTRBAA Credit, except to the extent expressly authorized by the Commission and \nnecessary to prevent duplicate recovery. \n5. Regulatory Approval(s) \n5.1. \nFERC Filing. This Agreement is the form of agreement required under Sections 10.9 \nand 10A.6 of the TO Tariff as a condition of DesertLink’s design, procurement, and \nconstruction of Large Load-Driven Upgrades. Consistent with 18 C.F.R. § 35.1(g), a \nconforming, executed Agreement entered into under the Commission-accepted pro \nforma with populated Schedules generally shall not require an individual filing under \nSection 205 of the Federal Power Act. DesertLink shall file an unexecuted Agreement \nor an Agreement containing a material deviation, and any other agreement required to \nbe filed by Commission order or rule. If FERC does not accept a required filing in its \nentirety, the Parties shall use reasonable efforts to amend and refile it; regulatory \nrejection does not excuse incurred construction costs or payment, Security, and true-up \nobligations for facilities placed in service, except to the extent FERC expressly \ndetermines otherwise.  \n6. Cost Recovery  \n6.1. \nCost Recovery and Minimum Contribution. DesertLink shall include the Large \nLoad-Driven Upgrades in its Formula Rate to the extent the project costs are properly \nincludable under the Formula Rate, the Protocols, and applicable law. This Agreement \ndoes not remove any Covered Upgrade from rate base or require a capital-cost \nreimbursement. The fixed twenty (20)-year Annual MTRC for each Covered Upgrade \nis instead calculated under the MTRC Calculation Template in Schedule 5, initially \nusing estimated cost and then using final incurred cost on the applicable Final MTRC \nDetermination Date. DesertLink shall recover its formula-rate revenue requirement \nthrough TAC and shall flow TRBAA Credits through to transmission customers \nthrough the TRBAA as provided in Section 6.8. Amounts received under this \nAgreement are not inputs to the Formula Rate, and this Agreement does not require \nany modification of the Formula Rate. Eligible Customer shall pay a Supplemental"},{"page":305,"startToken":115083,"endToken":115527,"text":"19 \n \nMTRC only to the extent forecast or actual Qualifying Transmission Revenues are less \nthan the applicable Annual MTRC. The Annual MTRC is a revenue floor, not an \nadditive charge, and does not alter CAISO cost allocation or DesertLink plant \naccounting. \nEligible Customer acknowledges that DesertLink will incur costs and undertake \nplanning, engineering, procurement, and construction in reliance on the Large Load \nFacility’s development and operation. Eligible Customer therefore accepts the \nwholesale payment and Security obligations in this Agreement. Any retail recovery \nfrom the Large Load Customer remains governed exclusively by applicable state law \nand Eligible Customer’s retail arrangements. \nAffected System Upgrades and the associated costs, revenues, payments, and financial \nsecurity or credit support are governed by Section 4.2 and the applicable Affected \nSystem Arrangement. Unless expressly authorized by the Commission, no Affected \nSystem Upgrade or associated revenue requirement shall be included in DesertLink’s \nAnnual MTRC, Total Required Revenue Commitment, Supplemental MTRC, \nCumulative Revenue Responsibility, or TRBAA Credit. \n6.2. \nQualifying Transmission Revenues. For each Rate Year or partial Rate Year, \n“Qualifying Transmission Revenues” means wholesale transmission revenues paid by \nor on behalf of Eligible Customer under the CAISO Tariff or another Commission-\naccepted arrangement that are attributable to service to the Large Load Facility and \nreduce transmission revenues otherwise collected from CAISO customers or directly \ncredit DesertLink’s Net Revenue Requirement. Qualifying Transmission Revenues \ninclude: (a) the portion of TAC revenue attributable to the Large Load Facility and \nallocable to DesertLink under the reproducible methodology in Schedule 2; and (b) \nWheeling Access Charges and other wholesale transmission-access, wheeling, or \ntransmission-service charges paid to CAISO, a Participating TO, or a non-PTO \ntransmission or load-serving entity for deliveries serving the Large Load Facility, but \nonly to the extent they reduce transmission revenues otherwise collected through TAC \nor directly credit DesertLink’s Net Revenue Requirement and are not otherwise \nreflected as a credit in calculating the Annual MTRC, the Supplemental MTRC, or a \nTRBAA Credit. Qualifying Transmission Revenues do not include Supplemental \nMTRC Receipts, Applied Security Proceeds, retail charges, or amounts that do not \nreduce transmission revenues otherwise collected from CAISO customers or directly \ncredit DesertLink’s Net Revenue Requirement. \n6.3. \nAnnual MTRC and Allocation.  \n6.3.1. Upgrade-Specific MTRC Calculation. DesertLink shall calculate a separate \nAnnual MTRC for each Covered Upgrade solely under the MTRC Calculation \nTemplate in Schedule 5. Before the Final MTRC Determination Date, DesertLink \nshall calculate and update the Estimated Annual MTRC from the then-current \nestimated capital cost. Within one (1) year after the applicable Covered Upgrade \nenters service, when the actual capital cost of that Covered Upgrade is known and \nall costs associated with its estimated capital cost have been accounted for,"},{"page":306,"startToken":115527,"endToken":116065,"text":"20 \n \nDesertLink shall establish the Final Annual MTRC using final incurred capital cost \nand the Project-Specific Levelized Fixed Charge Rate calculated under Schedule 5. \nSchedule 5 shall calculate the Project-Specific Levelized Fixed Charge Rate by: (i) \ndetermining the present-worth revenue requirement using the applicable capital \nstructure, cost of debt, return on equity, federal and state income-tax rates, income-\ntax conversion factor, and levelized-depreciation schedule; (ii) applying a \ndepreciation rate of five percent (5%) of the applicable capital cost input in each \nyear of the twenty (20)-year MTRC Term to calculate present-worth federal and \nstate income-tax depreciation benefits; (iii) annualizing the resulting present-worth \nrevenue requirement over the MTRC Term using the applicable after-tax discount \nrate and annualization factor; and (iv) adding the fixed expense allocator specified \nin Schedule 5. The Final Annual MTRC shall equal the applicable final incurred \ncapital cost multiplied by the resulting Project-Specific Levelized Fixed Charge \nRate. No component reflected in the Project-Specific Levelized Fixed Charge Rate \nor the fixed expense allocator shall be added again as a separate component of the \nAnnual MTRC. The Final Annual MTRC and the Schedule 5 inputs used to \ncalculate it are fixed as of the Final MTRC Determination Date and shall not be \nrecalculated for later changes in actual cost, Formula Rate inputs, or other cost-of-\nservice components, except to correct an error or fraud, to implement an effective \nprospective reassignment, to implement a final FERC order applicable to the \ncalculation, or to reflect, prospectively, a change in (i) DesertLink’s return on equity \ncomponent of its Formula Rate, resulting from a final FERC order accepting or \napproving such change, or (ii) applicable federal or state income tax rates or income \ntax law enacted after the Final MTRC Determination Date; provided that, the five \npercent (5%) annual levelized-depreciation schedule in Schedule 5 shall remain \nfixed for the MTRC Term unless a final FERC order requires otherwise. If \nDesertLink adjusts the Final Annual MTRC after the Final MTRC Determination \nDate pursuant to the foregoing provision, DesertLink shall update the MTRC \nCalculation Template and serve it upon Eligible Customer in accordance with the \nnotice provisions contained in this Agreement. Upon such service to Eligible \nCustomer, the updated MTRC Calculation Template shall replace the existing \nMTRC Calculation Template in its entirety and become effective on the date of such \nservice. The foregoing effectiveness of an updated MTRC Calculation Template \ndoes not preclude Eligible Customer from disputing any change to the MTRC \nCalculation Template pursuant to Article 11 of this Agreement. Any resulting \nadjustment to the Total Required Revenue Commitment shall apply only to the Rate \nYears remaining in the MTRC Term as provided in Section 6.7. \nEach Annual MTRC shall apply for its separate twenty (20)-year MTRC Term, with \nthe initial and final partial Rate Years prorated based on the number of monthly \nBilling Periods in the applicable Rate Year during which the Covered Upgrade is in \nservice. Schedule 1 shall identify the initial Estimated Annual MTRC and initial \nprojected Total Required Revenue Commitment for each Large Load-Driven \nUpgrade, and Schedule 5 shall record the Final MTRC Determination Date, Final \nAnnual MTRC, Total Required Revenue Commitment, and the completed \ncalculation for each Covered Upgrade. Schedule 4 shall provide the corresponding"},{"page":307,"startToken":116065,"endToken":116500,"text":"21 \n \nproject-specific information for a DesertLink-owned CAISO-Assigned Regional \nProject, if applicable. \n6.3.2. Initial Allocation. Schedule 1 shall identify, separately for each Large Load-\nDriven Upgrade, the percentage of the upgrade initially allocated to the Large Load \nCustomer under this Agreement (the “Initial Allocation Percentage”). The Initial \nAllocation Percentage shall be determined using the applicable final study and \nallocation methodology and shall account for: \n(a) Large Load Customers studied individually, jointly, or in a cluster; \n(b) the extent to which two or more Large Load Customers caused the need for \nor share a Large Load-Driven Upgrade; \n(c) differing requested service levels, development phases, and facility \nconfigurations; and \n(d) any portion of the facility determined at the outset to serve other \ntransmission system needs or customers. \nThe aggregate percentages allocated to all Large Load Customers for a Large Load-\nDriven Upgrade shall not exceed one hundred percent (100%). Any portion not \nallocated to a Large Load Customer shall be excluded from the Annual MTRC \nallocable to any Large Load Customer and remain subject to the otherwise-\napplicable CAISO cost allocation and rate recovery requirements. \n6.3.3. Applicable Allocation Percentage. For each Large Load-Driven Upgrade, the \n“Applicable Allocation Percentage” shall equal the Initial Allocation Percentage \nidentified in Schedule 1, as adjusted prospectively by any reassignment effective \nunder Section 6.9 or as otherwise required by a final Commission order or \napplicable tariff provision. A cancellation, abandonment, downsizing, curtailment, \npermanent cessation, or material reduction of service by the Large Load Customer \nshall not, by itself, reduce the Applicable Allocation Percentage. \n6.3.4. Annual MTRC Allocation. The Annual MTRC applicable to Eligible Customer \nshall equal the Annual MTRC for the Covered Upgrade as a whole multiplied by the \nApplicable Allocation Percentage; provided that, where Schedule 5 applies that \npercentage to capital cost or otherwise calculates the Annual MTRC for an already \nallocated project share, the resulting Annual MTRC is already allocated and the \npercentage shall not be applied again. DesertLink shall maintain the calculation \nseparately by Large Load Customer, Large Load Facility, and Covered Upgrade. \nThe aggregate Annual MTRCs allocated to all large load customers shall not exceed \nthe Annual MTRC for the Covered Upgrade as a whole. \n6.3.5. CAISO-Assigned Regional Projects Owned by DesertLink. For each CAISO-\nAssigned Regional Project owned by DesertLink and included in its Formula Rate, \nDesertLink shall calculate separately the Regional Project Allocated ARR \nattributable to the specific share formally assigned to the Large Load Facility. The \nRegional Project Allocated ARR shall be calculated solely under the MTRC \nCalculation Template in Schedule 5, using DesertLink’s allocated share of the"},{"page":308,"startToken":116500,"endToken":117008,"text":"22 \n \nproject’s estimated capital cost before the Final MTRC Determination Date and its \nallocated share of final incurred capital cost on that date, and shall be established, \nupdated, and fixed in the same manner and on the same schedule that Section 6.3.1 \nprovides for other Covered Upgrades. The resulting Annual MTRC shall be \nincluded in the Supplemental MTRC calculation and the Total Required Revenue \nCommitment beginning on the Regional Project In-Service Date. The allocated \nshare shall be determined under the applicable allocation under the CAISO Tariff or \nCommission-accepted methodology and the project-specific information in \nSchedule 4. No portion assigned to other customers, other facilities, or broader \nregional needs shall be included. Before the Regional Project In-Service Date, any \ncosts of a cancelled or abandoned project shall be treated under the applicable \nCAISO Tariff, Commission order, and any abandoned-plant incentive specifically \nauthorized for that project. This Agreement does not create a separate pre-service \npayment or Construction Security obligation solely because CAISO has assigned a \nregional project share to Large Load Facility. Any pre-service payment, \ncontribution, or security required by the CAISO Tariff, an applicable \nInterconnection Agreement, or another Commission-accepted arrangement remains \ndue under that authority and shall be identified in Schedule 4. Any abandoned-plant \nrecovery, customer payment, or security proceeds shall receive the accounting and \nrate treatment required by the Commission, and any credit necessary to prevent \nduplicate recovery of the same costs shall be recorded in the TRBA and flowed \nthrough to transmission customers through the TRBAA as provided in Section 6.8. \nAny prospective adjustment or reassignment of the share assigned to the Large Load \nFacility shall occur only as provided by the CAISO Tariff or a Commission-\naccepted methodology. Rate base inclusion, depreciation, and other accounting for \nthe underlying project share remain subject to the Formula Rate, the Protocols, and \nthe Commission's Uniform System of Accounts; this Section 6.3.5 governs only the \ncalculation of the Annual MTRC applicable to the Large Load Facility under this \nAgreement. \n6.3.6. CAISO-Assigned Regional Projects Owned by Another Entity. If CAISO \nformally assigns a specific share of a CAISO-Assigned Regional Project to the \nLarge Load Facility and that project is not owned by DesertLink or is not included \nin DesertLink’s Formula Rate, Eligible Customer shall satisfy the assigned share \nunder the CAISO Tariff or enter into and maintain the required arrangement with \nthe project owner or other responsible entity. The arrangement shall address, as \napplicable, payment of assigned costs and revenue responsibility, construction and \ncancellation obligations, security or credit support, invoicing, reconciliation, true-\nup, refund, release, and any required regulatory filing or acceptance. Eligible \nCustomer shall provide DesertLink a copy of the executed arrangement or other \nevidence reasonably sufficient to demonstrate compliance, including the amount and \nbasis of the assigned share, the billing party, payment terms, and required security. \nEligible Customer shall provide the required arrangement or evidence by the \ndeadline specified in Schedule 4, which shall be no later than the earliest applicable \ndeadline under the CAISO Tariff or project-owner arrangement and, where the"},{"page":309,"startToken":117008,"endToken":117474,"text":"23 \n \nassignment is known before construction, before the project owner commences \nconstruction. If CAISO makes the assignment after construction has commenced or \nafter the project enters service, Eligible Customer shall comply within the period \nspecified by CAISO or the project owner and provide evidence to DesertLink \npromptly. Failure to comply is an Event of Default if not cured as provided in \nSection 7.11(c). \nAmounts owed to another project owner are not included in any Annual MTRC, \nRegional Project Allocated ARR, Total Required Revenue Commitment, \nSupplemental MTRC, Cumulative Revenue Responsibility, or TRBAA Credit \nunless the amount is included in DesertLink’s Formula Rate and Schedule 4 \nexpressly identifies it as DesertLink’s assigned share. The applicable tariff or \nproject-owner arrangement shall identify and apply any credits required to prevent \nduplicate recovery of the same assigned share through both a direct charge and a \ntransmission rate. Payments to another owner satisfy only the corresponding \nobligation under that tariff or arrangement and do not reduce the Cumulative \nRevenue Responsibility owed to DesertLink unless they satisfy the same underlying \nobligation included in DesertLink’s Formula Rate. The Eligible Customer’s \nobligations under this Section survive termination of this Agreement and cessation \nof service until the assigned share has been paid or assumed by a successor and the \nobligation has been discharged, transferred, or released under the applicable CAISO \nTariff or project-owner arrangement by the entity entitled to enforce it. \n6.4. \nSupplemental MTRC. Beginning on the in-service date of each Covered Upgrade, \nEligible Customer shall pay the positive shortfall, if any, between the applicable \nAnnual MTRC, prorated for a partial Rate Year based on the number of monthly \nBilling Periods in that Rate Year during which the Covered Upgrade is in service, and \nQualifying Transmission Revenues attributable to the Large Load Facility during the \ncorresponding Rate Year or partial Rate Year. Until the Final MTRC Determination \nDate, billing shall use the Estimated Annual MTRC. Upon initial finalization, the Final \nAnnual MTRC shall apply back to the applicable in-service date, and estimated \ncharges shall be reconciled in the next Reconciliation Statement under Section 6.6. \nThereafter, the calculation shall use the Final Annual MTRC, subject to adjustments \npermitted by Section 6.3.1. Qualifying Transmission Revenues attributable to a \nspecific Covered Upgrade shall be applied to that upgrade. Qualifying Transmission \nRevenues not attributable to a specific Covered Upgrade shall be allocated among the \nCovered Upgrades then in their MTRC Terms pro rata based on their respective \nprorated Annual MTRCs for the applicable period. \nThe calculation may be expressed as: \nSupplemental MTRC = max (applicable Annual MTRC − Qualifying Transmission \nRevenues, $0). \nThe Annual MTRC is not an annual true-up of project cost or Formula Rate inputs. \nAnnual reconciliation is limited to Qualifying Transmission Revenues, Supplemental \nMTRC invoices and receipts, Applied Security Proceeds, TRBAA Credits, partial-year"},{"page":310,"startToken":117474,"endToken":117969,"text":"24 \n \nproration, effective prospective reassignment, and correction of error, fraud, a final \nFERC order applicable to the calculation, and any prospective recalculation of the \nFinal Annual MTRC permitted by Section 6.3.1. \n6.5. \nInvoice. With each Annual Projection, DesertLink shall forecast Qualifying \nTransmission Revenues and calculate the projected Supplemental MTRC using the \napplicable fixed or estimated Annual MTRC from Schedule 5, increased or reduced by \nany prior-period true-up adjustment under Section 6.6. DesertLink shall invoice the \nforecasted Supplemental MTRC for the applicable Rate Year or partial Rate Year in \nequal monthly installments for each Billing Period in that Rate Year during which the \nCovered Upgrade is in service; for a full Rate Year, the projected Supplemental \nMTRC shall be invoiced in twelve (12) equal monthly installments. Each installment \nis payable within thirty (30) Calendar Days after receipt of the invoice. If a Covered \nUpgrade reaches its applicable in-service date during a Rate Year for which the \nAnnual Projection did not include a projected Supplemental MTRC for that Covered \nUpgrade, DesertLink shall promptly forecast Qualifying Transmission Revenues and \ninvoice the prorated Supplemental MTRC for the remaining Billing Periods of that \nRate Year. DesertLink shall include the projected Supplemental MTRC, including any \nprior-period true-up adjustment, as a Forecast TRBAA Credit in the next annual \nTRBAA under Section 6.8. Only cash actually received by DesertLink, or Applied \nSecurity Proceeds actually applied by DesertLink, constitutes an actual receipt for \npurposes of Sections 6.6 through 6.8. Concurrently with each Annual Projection, \nDesertLink shall provide Eligible Customer upgrade-specific workpapers showing the \napplicable Annual MTRC, forecast Qualifying Transmission Revenues, projected \nSupplemental MTRC, any prior-period true-up adjustment, Forecast TRBAA Credit, \nTotal Required Revenue Commitment, and Required Operational Security. \n6.6. \nAnnual Reconciliation Statement. In connection with each Annual Update, \nDesertLink shall determine the actual Supplemental MTRC obligation using actual \nQualifying Transmission Revenues and the applicable fixed or estimated Annual \nMTRC from Schedule 5. DesertLink shall identify, by Eligible Customer and Covered \nUpgrade, the opening unpaid billed Supplemental MTRC balance, Supplemental \nMTRC invoiced during the Rate Year, cash received by DesertLink, Applied Security \nProceeds applied to identified obligations, direct recoveries, closing unpaid billed \nbalance, and each Annual Termination Fee Credit. Concurrently with each Annual \nUpdate, DesertLink shall serve on Eligible Customer a Reconciliation Statement \ncontaining those determinations, the updated Cumulative Revenue Ledger, Required \nOperational Security recalculated under Section 7.4, a reconciliation of the Forecast \nTRBAA Credit to actual amounts recorded in the TRBA, and supporting workpapers. \nAn unpaid Supplemental MTRC remains due from Eligible Customer and, when later \nreceived or satisfied through Applied Security Proceeds, is recorded in the TRBA only \nin the Rate Year of receipt or application. The Reconciliation Statement shall not \nreopen the Final Annual MTRC or Total Required Revenue Commitment except as \nexpressly allowed by Section 6.3.1. \nThe difference between the Supplemental MTRC billed for a Rate Year, excluding any \nprior-period true-up adjustment included in that billing, and the actual Supplemental"},{"page":311,"startToken":117969,"endToken":118464,"text":"25 \n \nMTRC determined in the Reconciliation Statement for that Rate Year shall constitute a \n“prior-period true-up adjustment,” which shall increase (if under-billed) or reduce (if \nover-billed) the projected Supplemental MTRC invoiced under Section 6.5 following \nthe next Annual Projection. If no further Supplemental MTRC will be invoiced under \nthis Agreement, DesertLink shall invoice any under-billed amount, payable within \nthirty (30) Calendar Days after receipt of the invoice, and shall refund any over-billed \namount to Eligible Customer within thirty (30) Calendar Days after service of the \nReconciliation Statement. No interest shall accrue on the Supplemental MTRC or on \nany prior-period true-up adjustment, invoice, refund, or other adjustment of the \nSupplemental MTRC between DesertLink and Eligible Customer. Any refund to \nEligible Customer of an amount previously recorded as a TRBAA Credit shall be \nreversed in the TRBA when paid, and any under-billed amount later received shall be \nrecorded in the TRBA when received, in each case as provided in Section 6.8. Any \namount returned by DesertLink to transmission customers through the TRBAA shall \ninclude interest as provided in Section 5.5 of the TO Tariff. \nA Reconciliation Statement shall become final on the earlier of (a) Eligible \nCustomer’s written acceptance of the Reconciliation Statement or (b) ninety (90) \nCalendar Days after service, unless before that date Eligible Customer serves a Notice \nof Dispute under Section 11.1 identifying with reasonable specificity the items \ndisputed. If a Notice of Dispute is timely served, the undisputed portions of the \nReconciliation Statement shall become final on the date that would otherwise apply, \nand the disputed items shall become final upon the applicable Dispute Determination \nunder Section 11.5. A final Reconciliation Statement may be revised only to \nimplement a Dispute Determination, to reflect CAISO resettlements or other corrected \ndata as provided in Schedule 2, or to correct errors or fraud. Finality of a \nReconciliation Statement under this Agreement does not affect the Commission’s \nreview and approval of any TRBAA. \nFor purposes of this Agreement, Supplemental MTRC Receipts exclude Applied \nSecurity Proceeds. Applied Security Proceeds shall be counted only when DesertLink \napplies such proceeds to satisfy an identified payment obligation and shall reduce that \nobligation dollar-for-dollar. The posting, maintenance, replenishment, drawing, or \nholding of Security shall not, by itself, constitute a Supplemental MTRC Receipt, an \nApplied Security Proceed, satisfaction of the Cumulative Revenue Responsibility, or a \nTRBAA Credit. \nNo amount shall be counted both as a Supplemental MTRC Receipt and as an Applied \nSecurity Proceed. If DesertLink receives payment of an obligation previously satisfied \nthrough Applied Security Proceeds, DesertLink shall not count the subsequent \npayment toward the Cumulative Revenue Responsibility or a TRBAA Credit and shall \ninstead return the duplicative amount, release an equivalent amount of Security, or, \nwith supporting notice to Eligible Customer, apply the amount to another then-\noutstanding obligation under this Agreement. \n6.7. \nCumulative Revenue Responsibility and Break-Even. DesertLink shall maintain a \nCumulative Revenue Ledger for each Covered Upgrade and shall update it at least"},{"page":312,"startToken":118464,"endToken":118859,"text":"26 \n \nannually in connection with the Annual Update. DesertLink shall include an updated \nCumulative Revenue Ledger statement, with supporting workpapers, in each \nReconciliation Statement served on Eligible Customer under Section 6.6. For each \nCovered Upgrade, the Total Required Revenue Commitment equals the Final Annual \nMTRC multiplied by twenty (20), adjusted only for partial-year proration and any \nprospective recalculation of the Final Annual MTRC permitted by Section 6.3.1, \nwhich shall apply only to the Rate Years remaining in the MTRC Term after the \nrecalculation takes effect. Until the Final MTRC Determination Date, the projected \nTotal Required Revenue Commitment shall equal the Estimated Annual MTRC \nmultiplied by twenty (20). \nRemaining Cumulative Revenue Responsibility equals the applicable Total Required \nRevenue Commitment less: \n(a) cumulative Qualifying Transmission Revenues; \n(b) cumulative Supplemental MTRC Receipts; \n(c) cumulative Applied Security Proceeds; \n(d) effective prospective reassignment credits; and \n(e) cash amounts received and applied toward the Termination Fee, excluding any \nportion satisfied through Applied Security Proceeds already counted under \nclause (c). \nEach dollar shall be entered in the Cumulative Revenue Ledger only once. \nSupplemental MTRC Receipts shall exclude Applied Security Proceeds. Applied \nSecurity Proceeds shall be entered only when applied to an identified Supplemental \nMTRC, prior-period true-up adjustment, Termination Fee, or other payment obligation \nunder Article 6 or Section 3.3.4. Security that is posted, drawn but not applied, held as \na deferred liability, replenished, replaced, or returned shall not reduce the Cumulative \nRevenue Responsibility. Annual Termination Fee Credits and the corresponding \nTermination Fee Balance shall be separately identified in the Reconciliation Statement \nand in the workpapers required under Section 6.8 and shall not again reduce the \nCumulative Revenue Responsibility. \nIf an amount previously credited in the Cumulative Revenue Ledger is subsequently \nrefunded, reversed, disallowed, or otherwise ceases to satisfy the applicable obligation, \nDesertLink shall make a corresponding adjustment to the ledger, subject to the finality \nand no-revival provisions of this Section. \nCancellation, downsizing, curtailment, or departure does not extinguish the remaining \nresponsibility. When a final Reconciliation Statement determines that the \nresponsibility has reached zero (“Break-Even”), DesertLink shall terminate the \noperational payment and Security obligations and release any excess Security. Once \nfinally satisfied, the responsibility shall not revive because of a later change in ROE, \nexpense, load, forecast, or other Formula Rate input, subject only to final true-ups and \ncorrection of errors or fraud for periods before satisfaction."},{"page":313,"startToken":118859,"endToken":119396,"text":"27 \n \n6.8. \nTRBAA Credit and No Double Recovery. Supplemental MTRC Receipts, Applied \nSecurity Proceeds other than Applied Security Proceeds applied to a Termination Fee, \nAnnual Termination Fee Credits, and any duplicate-recovery credit under Section \n3.3.3(d) or Section 6.3.5 shall be credited to transmission customers solely through the \nTRBAA and shall not be recorded as revenue credits in, or otherwise included as \ninputs to, the Formula Rate. In each annual TRBAA, DesertLink shall include as the \nForecast TRBAA Credit: (a) the projected Supplemental MTRC for the following Rate \nYear, increased or reduced by any prior-period true-up adjustment invoiced under \nSection 6.5; and (b) for any Covered Upgrade with a Termination Fee Balance, the \nAnnual Termination Fee Credit scheduled under Section 3.3.4 for the following Rate \nYear, prorated as applicable and limited to the available Termination Fee Balance. \nDesertLink shall record in the TRBA only Supplemental MTRC cash receipts, Applied \nSecurity Proceeds other than Applied Security Proceeds applied to a Termination Fee, \nand Annual Termination Fee Credits actually received, applied, or scheduled for the \napplicable Rate Year, respectively. Applied Security Proceeds applied to a \nTermination Fee shall be deposited into and held in the Termination Fee Account \nunder Section 3.3.4 and shall be credited to transmission customers solely through the \napplicable Annual Termination Fee Credits. The difference between the Forecast \nTRBAA Credit and those actual amounts shall be reflected in the principal balance of \nthe TRBA and flowed through to transmission customers in a subsequent TRBAA. A \nbilled but unpaid Supplemental MTRC is not a TRBAA Credit. A later Supplemental \nMTRC Receipt or Applied Security Proceeds, other than Applied Security Proceeds \napplied to a Termination Fee, shall be recorded only in the Rate Year in which it is \nreceived or applied, respectively. Any amount previously recorded as a TRBAA Credit \nthat is later refunded, reversed, or otherwise ceases to satisfy the applicable obligation \nshall be reversed in the TRBA when refunded or reversed. Interest on the TRBA \nbalance shall be calculated as provided in Section 5.5 of the TO Tariff. Qualifying \nTransmission Revenues shall not be included again as a TRBAA Credit because they \nare already reflected in calculating the Supplemental MTRC. \nEach dollar shall be included in a TRBAA Credit only once. Applied Security \nProceeds shall not also be treated as Supplemental MTRC Receipts, and the posting, \ndrawing, holding, replenishment, replacement, or return of Security shall not \nindependently produce a TRBAA Credit. A Forecast TRBAA Credit applies only to \nthe forecast Rate Year and shall be reconciled through the TRBA to actual \nSupplemental MTRC Receipts, Applied Security Proceeds other than those applied to \na Termination Fee, and Annual Termination Fee Credits, as applicable. \nDesertLink shall maintain workpapers reconciling each Forecast TRBAA Credit and \neach amount recorded in the TRBA under this Section 6.8 to the applicable Annual \nMTRC calculation in Schedule 5, forecast and actual Qualifying Transmission \nRevenues, opening unpaid billed balance, Supplemental MTRC invoiced, prior-period \ntrue-up adjustment, Supplemental MTRC cash receipt, Applied Security Proceed, \ndirect recovery, closing unpaid billed balance, Termination Fee Balance, Annual \nTermination Fee Credit, resulting forecast-to-actual TRBA difference, Rate Year, \nLarge Load Customer, and Covered Upgrade. DesertLink shall include with each"},{"page":314,"startToken":119396,"endToken":119814,"text":"28 \n \nTRBAA filing workpapers sufficient to permit transmission customers to verify the \nTRBAA Credits reflected in that TRBAA, which may present customer-specific \ninformation on an aggregated basis or be submitted subject to a request for privileged \ntreatment under 18 C.F.R. § 388.112 or other appropriate confidentiality protections. \n6.9. \nProspective Reassignment of Revenue Responsibility.  \n6.9.1. Eligibility for Reassignment of Revenue Responsibility. Whether or not the \nLarge Load Customer remains in service, a portion of the prospective revenue \nresponsibility associated with a Large Load-Driven Upgrade may be reassigned to a \nsubsequent load customer if an objective transmission study conducted under the \napplicable tariff or study process determines that: \n(a) the subsequent large load customer relies upon identifiable incremental \ncapability created by the Large Load-Driven Upgrade; and \n(b) that reliance avoids or reduces identifiable transmission upgrades that \notherwise would have been required to provide the subsequent large load \ncustomer’s requested service. \nIncidental power flows, generalized system benefits, or use of the transmission \nsystem that does not satisfy both requirements shall not support a reassignment. \nThis Section 6.9 applies only to a load customer other than the Large Load \nCustomer, at a facility other than the Large Load Facility. It does not apply to a \ntransfer of ownership or operation of the Large Load Facility, a change in Eligible \nCustomer, or an assignment of this Agreement, which are governed by Sections \n6.10 and 10.1 and do not alter the Applicable Allocation Percentage or the Large \nLoad-Driven Upgrades attributable to the Large Load Facility. \n6.9.2. Reassignment Calculation. DesertLink shall determine the prospective \nreassignment separately for each Large Load-Driven Upgrade satisfying Section \n6.9.1 (each, a “Shared Upgrade”). For each Shared Upgrade: \n(a) the Demonstrated Avoided Upgrade Cost shall equal the reasonable \nestimated cost of the transmission upgrades that would have been required \nfor the subsequent large load customer absent the Shared Upgrade, less the \nreasonable estimated cost of any additional transmission upgrades required \nwhen the capability of the Shared Upgrade is considered; \n(b) the Remaining Allocated Net Plant shall equal the portion of the Shared \nUpgrade’s net plant balance included in rate base immediately before the \nreassignment that remains assigned to the Large Load Customer under this \nAgreement; \n(c) the Capability-Supported Amount shall equal the portion of the Remaining \nAllocated Net Plant reasonably attributable to the incremental capability of \nthe Shared Upgrade actually relied upon by the subsequent large load \ncustomer; and \n(d) the Reassigned Investment Amount shall equal the least of:"},{"page":315,"startToken":119814,"endToken":120192,"text":"29 \n \n(i) the Demonstrated Avoided Upgrade Cost; \n(ii) the Capability-Supported Amount; and \n(iii) the Remaining Allocated Net Plant. \nThe Demonstrated Avoided Upgrade Cost, Capability-Supported Amount, and \nRemaining Allocated Net Plant shall be determined using a consistent cost basis and \nprice year. If Remaining Allocated Net Plant is greater than zero, the Reassignment \nPercentage shall equal the Reassigned Investment Amount divided by the \nRemaining Allocated Net Plant, bounded between zero and one hundred percent \n(100%). If Remaining Allocated Net Plant is zero or negative, no Reassignment \nPercentage shall be calculated under this methodology; any reassignment shall \nrequire an applicable tariff methodology or Commission determination addressing \nthat circumstance. \n6.9.3. Prospective Adjustment of Revenue Responsibility. Beginning on the \nReassignment Effective Date, the applicable Annual MTRC assigned to the Large \nLoad Customer shall be prospectively reduced by the Reassignment Percentage \napplied to the Shared Upgrade. DesertLink shall record a separate effective \nprospective reassignment credit in the Cumulative Revenue Ledger equal to the \nReassignment Percentage multiplied by the Remaining Cumulative Revenue \nResponsibility associated with the Shared Upgrade that remains assigned to the \nLarge Load Customer immediately before the Reassignment Effective Date. That \ncredit shall be the sole Cumulative Revenue Ledger adjustment for the reassigned \nresponsibility. It shall not adjust the Total Required Revenue Commitment or result \nin a second reduction to the Remaining Cumulative Revenue Responsibility or \nRequired Operational Security for the same reassigned responsibility. \nDesertLink shall recalculate the Supplemental MTRC and Operational Security \nunder this Agreement to reflect the reassignment. The Reassignment Effective Date \nshall be the latest of: \n(a) the date the subsequent large load customer commences the service for \nwhich the Shared Upgrade provides the identified incremental capability; \n(b) the effective date of a cost recovery agreement establishing the subsequent \nlarge load customer’s corresponding revenue responsibility; \n(c) the date on which all Security required from the eligible customer serving \nthe subsequent large load customer becomes effective; and \n(d) the date on which the study and any other approvals required under the \napplicable tariff become final. \nNo reduction in the Large Load Customer’s Operational Security shall occur until \nthe corresponding responsibility and required Security have become effective for the \nsubsequent large load customer. \n6.9.4. Prospective Treatment and Prevention of Duplicate Reassignment. A \nreassignment under this Section shall:"},{"page":316,"startToken":120192,"endToken":120660,"text":"30 \n \n(a) operate prospectively only and shall not produce a refund, credit, or \nreopening of amounts properly determined for a prior Rate Year; \n(b) transfer prospective revenue responsibility only and shall not constitute a \nsale or transfer of transmission facilities, a transfer of plant ownership, a \nchange in plant accounting, or a modification of any CAISO cost allocation; \n(c) not exceed the prospective responsibility remaining under this Agreement \nfor the Shared Upgrade; and \n(d) not assign the same transmission capability, avoided upgrade cost, Annual \nMTRC, or Cumulative Revenue Responsibility to more than one large load \ncustomer. \nDesertLink shall maintain an upgrade-specific reassignment ledger identifying the \ncapability and responsibility assigned to each large load customer. Once \nresponsibility has been effectively reassigned, that responsibility shall not revert to \nthe Large Load Customer if the subsequent large load customer later terminates, \nreduces, or fails to commence service. The reassigned responsibility shall instead \nremain with the subsequent large load customer and the Eligible Customer \nresponsible for its payment, subject to any further prospective reassignment \npermitted under the applicable agreement and tariff. \nAny prospective reassignment, adjustment, or change in the cost share of a CAISO-\nAssigned Regional Project shall be recognized under this Agreement only to the \nextent authorized or required by the CAISO Tariff or a Commission-accepted \nmethodology. DesertLink shall apply an effective change prospectively to the \nRegional Project Allocated ARR, Cumulative Revenue Responsibility, \nSupplemental MTRC, TRBAA Credit, and Operational Security, and shall update \nSchedule 4 and the applicable workpapers. The change shall not assign the same \nproject share to more than one customer or alter costs allocated to other customers \nunder the CAISO Tariff. \n6.10. Change in Eligible Customer. Cost responsibility is assigned to the Large Load \nCustomer and Large Load Facility, as paid by the Eligible Customer then taking \nwholesale transmission service on behalf of the Large Load Customer and Large Load \nFacility. If the Eligible Customer serving a Large Load Customer or Large Load \nFacility changes, the Successor Eligible Customer must execute an assumption \nagreement covering the Cumulative Revenue Responsibility and any outstanding \nobligations under Section 6.3.6, provide required Security, and become responsible on \na date coordinated with CAISO billing before the prior Eligible Customer is released. \nFollowing the complete departure of the Large Load Customer, the last responsible \nEligible Customer remains obligated unless responsibility is transferred under an \napplicable tariff or state-law mechanism, assumed by a successor, or prospectively \nreassigned as permitted under this Agreement and the CAISO Requirements. If \nownership or operation of the Large Load Facility is transferred, Eligible Customer \nshall notify DesertLink within thirty (30) Calendar Days and shall cause the transferee \nto execute a Limited Acknowledgment in the form attached to this Agreement. The \ntransfer shall not alter the Applicable Allocation Percentage, Cumulative Revenue \nResponsibility, or Security obligations under this Agreement."},{"page":317,"startToken":120660,"endToken":121109,"text":"31 \n \nA sale, lease, or other transfer of the Large Load Facility, or of the Large Load \nCustomer’s interest in such Large Load Facility, is not a reassignment under Section \n6.9 and does not require a study under Section 6.9.1. Cost responsibility shall continue \nto follow the Large Load Facility, the transferee shall execute a Limited \nAcknowledgment substantially in the form included in this Agreement, and Eligible \nCustomer shall remain responsible for its obligations under this Agreement unless they \nare transferred to a Successor Eligible Customer under this Section 6.10. \n6.11. CAISO Data and Settlement Coordination. Eligible Customer shall provide \nDesertLink, or authorize and direct its Scheduling Coordinator, Utility Distribution \nCompany, Metering Coordinator, and other applicable entities to provide DesertLink, \nwith the metering, settlement, billing, resettlement, allocation, and other data \nreasonably necessary to calculate and verify Qualifying Transmission Revenues and \nadminister this Agreement. Eligible Customer shall execute any authorization or data-\nrelease documentation reasonably necessary for DesertLink to obtain such \ninformation. \nTo the extent authorized or required by the CAISO Tariff, CAISO may provide or \nmake available relevant settlement, metering, billing, resettlement, and allocation data \nas provided under the CAISO Requirements. Nothing in this Agreement, however, \nimposes an obligation on CAISO or makes CAISO a party to this Agreement. \nDesertLink and Eligible Customer shall cooperate with CAISO and other applicable \nentities to establish and maintain the billing identifiers, metering points, data \nexchanges, and authorizations identified in Schedule 2. \nDesertLink shall calculate Qualifying Transmission Revenues, the Annual MTRC, and \nthe Supplemental MTRC; maintain the Cumulative Revenue Ledger; and serve on \nEligible Customer the Reconciliation Statement, including the Cumulative Revenue \nLedger statement, required by Sections 6.6 and 6.7. \nIf final data are not available when a calculation is required, DesertLink may use \nreasonable estimates based on the best information then available, subject to \nreconciliation under Section 6.6 when final or corrected data become available. \n6.12. Information Rights and Confidentiality. Upon reasonable request, DesertLink shall \nprovide Eligible Customer the workpapers, data, and other information reasonably \nnecessary to verify the identification of Large Load-Driven Upgrades and CAISO-\nAssigned Regional Projects and all calculations of each Annual MTRC, Regional \nProject Allocated ARR, Total Required Revenue Commitment, Qualifying \nTransmission Revenues, Supplemental MTRC, Cumulative Revenue Responsibility, \nTRBAA Credits, reassignment, and Security under this Agreement. Any dispute \nconcerning those matters shall be resolved under Article 11. Large Load Customer and \nany Successor Eligible Customer may participate in a dispute under Article 11 to the \nextent the dispute affects its obligations under this Agreement or its Limited \nAcknowledgment. Customer-specific information shall be protected under Section \n16.3 of the TO Tariff, the CAISO Tariff, and any applicable confidentiality agreement."},{"page":318,"startToken":121109,"endToken":121529,"text":"32 \n \n7. Security and Payment Obligations \n7.1. \nConstruction Security. Before an applicable Large Load-Driven Upgrade reaches its \nUpgrade In-Service Date, Eligible Customer shall maintain Construction Security \nunder the relevant agreement sufficient to secure: \n(a) DesertLink’s incurred and irrevocably committed engineering, design, \nprocurement, permitting, construction, testing, and related costs attributable \nto that upgrade; and \n(b) the Pre-In-Service Termination Costs described in Section 3.3.2, including \nproperly accrued AFUDC and applicable cancellation, demobilization, \nequipment removal, disposition, remediation, and restoration costs \n(“Construction Security”).  \nConstruction Security secures, but does not limit, Eligible Customer’s liability for \nthose amounts. Construction Security provided under the relevant Interconnection \nAgreement or an engineering and procurement agreement for the same costs shall \ncount toward, and shall not be duplicated by, the Construction Security required under \nthis Agreement. Construction Security shall remain in effect for each Large Load-\nDriven Upgrade until that upgrade reaches its Upgrade In-Service Date and the \napplicable release or conversion conditions in Section 7.2 are satisfied. \nA Large Load-Driven Upgrade reaching its Upgrade In-Service Date shall not result in \nthe release of Construction Security attributable to another Large Load-Driven \nUpgrade that has not reached its Upgrade In-Service Date. Eligible Customer shall \nreplenish Construction Security within ten (10) Business Days after notice of a \npermitted draw and supporting information if additional secured obligations remain \nand the remaining Construction Security is less than the amount required under this \nSection. \nFor a CAISO-Assigned Regional Project owned by DesertLink, any pre-service \npayment, contribution, or security required from Eligible Customer for its formally \nassigned share shall be provided only as required by the CAISO Tariff, an applicable \nInterconnection Agreement, or another Commission-accepted arrangement, and shall \nbe identified in Schedule 4. This Agreement does not independently require pre-\nservice Construction Security solely because CAISO has assigned a share of a regional \nproject to the Large Load Facility. The treatment of costs for a cancelled or abandoned \nregional project shall be governed by Section 6.3.5 and the applicable Commission \norder, CAISO Tariff, and any project-specific abandoned-plant incentive authorized by \nthe Commission. For a project owned by another entity, construction and operational \nsecurity shall be provided under the CAISO Tariff or the arrangement required by \nSection 6.3.6 and Schedule 4; it shall not be treated as DesertLink Operational \nSecurity unless included in DesertLink’s Formula Rate and expressly identified as \nDesertLink’s share. \n7.2. \nDelivery of Operational Security. No later than thirty (30) Calendar Days before the \nearliest expected Upgrade In-Service Date identified in Schedule 1 or Regional Project"},{"page":319,"startToken":121529,"endToken":121951,"text":"33 \n \nIn-Service Date identified in Schedule 4 for a DesertLink-owned CAISO-Assigned \nRegional Project, Eligible Customer shall deliver Operational Security calculated \nunder this Article for the Large Load-Driven Upgrades and DesertLink-owned \nCAISO-Assigned Regional Project expected to enter service. Operational Security \nmust be fully effective before any applicable Upgrade In-Service Date or Regional \nProject In-Service Date.  \nIf different Large Load-Driven Upgrades or DesertLink-owned CAISO-Assigned \nRegional Projects are expected to reach their applicable in-service dates on different \ndates, DesertLink shall recalculate the Required Operational Security before each \nsubsequent in-service date to include the additional Cumulative Revenue \nResponsibility attributable to the upgrade or project share entering service. Eligible \nCustomer shall provide any resulting increase no later than fifteen (15) Business Days \nafter receipt of a Security Notice, or by the applicable in-service date if earlier. \nInclusion of pre-service Construction Work in Progress in rate base shall not constitute \nan Upgrade In-Service Date or independently trigger the Operational Security \nrequirement. Construction Security shall remain applicable to each Large Load-Driven \nUpgrade that has not reached its Upgrade In-Service Date. \nNo Construction Security attributable to a Large Load-Driven Upgrade shall be \nreleased or converted unless:  \n(a) the Required Operational Security attributable to that upgrade is effective; \n(b) that upgrade has reached its Upgrade In-Service Date; and \n(c) DesertLink has determined that all Pre-In-Service Termination Costs and \nother construction-related obligations attributable to that upgrade have been \npaid or adequately reserved for. \nAny portion of Construction Security retained for unresolved construction costs shall \nbe released after DesertLink determines that those costs have been paid or adequately \nreserved for or, if Section 3.3.2 applies, after the Termination Cost Reconciliation \nbecomes final. Failure to timely deliver Required Operational Security is a default \npermitting DesertLink, to the extent authorized by the applicable tariffs and \nagreements, to suspend energization or service, terminate applicable interconnection \narrangements, and draw Construction Security for secured obligations.  \n7.3. \nRequired Operational Security. Required Operational Security shall equal one \nhundred percent (100%) of the nominal Remaining Cumulative Revenue \nResponsibility. DesertLink shall reduce that amount only by the portion of Qualifying \nRetail Security Support identified in a currently effective Retail Security Certification. \nA Retail Security Certification is accepted in reliance on Eligible Customer’s \nrepresentations and does not require DesertLink to review the underlying retail-\nsecurity documents in the ordinary course. If DesertLink has a reasonable basis to \nquestion the certification, or after a payment default, Credit Review Event, or Material \nAdverse Credit Event, DesertLink may request supporting information reasonably \nnecessary to verify continued compliance. Any resulting deficiency shall be delivered"},{"page":320,"startToken":121951,"endToken":122433,"text":"34 \n \nor restored within fifteen (15) Business Days after receipt of a Security Notice, or by \nthe applicable in-service date if earlier. \n7.4. \nAnnual Resizing and Security Notices. DesertLink shall recalculate Required \nOperational Security with each Annual Projection, Final MTRC Determination Date, \nrecalculation of a Final Annual MTRC under Section 6.3.1, Reconciliation Statement, \neffective prospective reassignment, replacement or expiration of Qualifying Retail \nSecurity Support, or Credit Review Event. If DesertLink reasonably determines that \nthe Required Security Amount exceeds available Security, it may issue a Security \nNotice identifying the required increase or restoration and reasonable supporting detail \nthen available. Eligible Customer shall provide the required increase or restoration \nwithin fifteen (15) Business Days after receipt of the Security Notice, or by the \napplicable in-service date if earlier. A reduction shall be released only after the \nrelevant calculation and reconciliation are final. \n7.5. \nForm of Operational Security. Except to the extent of currently effective Qualifying \nRetail Security Support, Eligible Customer shall provide direct Operational Security in \nthe form of cash, an irrevocable standby Letter of Credit meeting Schedule 3, or any \ncombination of cash and Letter of Credit. DesertLink may accept another form of \nSecurity that it determines, in its sole discretion, is acceptable. \nEach Letter of Credit shall have an initial stated term of at least twelve (12) months \nand shall remain continuously effective until released under this Agreement; provided, \nhowever, that a Letter of Credit may have a stated expiration date before its release \ndate if Eligible Customer timely extends or replaces it so that Security in an amount \nnot less than the Required Security Amount remains continuously available to \nDesertLink.  \nIf an issuing bank has the right not to renew a Letter of Credit, the Letter of Credit \nshall require the issuing bank to provide DesertLink and Eligible Customer at least \nninety (90) Calendar Days’ prior written notice of nonrenewal. Eligible Customer shall \nprovide a conforming extension or replacement Letter of Credit, or additional cash \ncollateral or other Security accepted by DesertLink, no later than sixty (60) Calendar \nDays before the applicable expiration date.   \nIf Eligible Customer fails to provide the required extension, replacement, or other \nSecurity by that deadline, DesertLink may, before the Letter of Credit expires, draw all \nor any portion of the then-available amount under the Letter of Credit and retain the \nproceeds as cash collateral, apply the proceeds to secured obligations, or both. Any \nproceeds retained but not applied shall continue to constitute Security until released \nunder this Agreement. \n7.6. \nDraw and Application. DesertLink may draw against all or any portion of a Letter of \nCredit, apply cash collateral, or apply another form of Security accepted by \nDesertLink to secured obligations upon: (a) an unpaid Supplemental MTRC, true-up, \nTermination Fee, or other amount due after the applicable payment period; (b) Eligible \nCustomer’s failure to timely deliver, maintain, replace, restore, or increase Security;"},{"page":321,"startToken":122433,"endToken":122939,"text":"35 \n \n(c) cancellation, termination, withdrawal, abandonment, or permanent cessation of the \nLarge Load Facility or a material breach of this Agreement; (d) a material inaccuracy \nin a Retail Security Certification or Security instrument; (e) Eligible Customer: (i) files \na voluntary petition in bankruptcy or seeks reorganization, arrangement, or similar \nrelief under any bankruptcy, insolvency, or debtor-relief law; (ii) becomes subject to \nan involuntary bankruptcy or insolvency proceeding that is not dismissed within sixty \n(60) Calendar Days; (iii) has a receiver, trustee, liquidator, or custodian appointed for \nit or a substantial portion of its assets, which appointment is not vacated within sixty \n(60) Calendar Days; (iv) makes a general assignment for the benefit of creditors; or (v) \nadmits in writing its inability to pay debts as they become due; or (f) Eligible \nCustomer fails to extend, replace, or otherwise maintain Security in the amount and \nwithin the time required by Section 7.5, including following a notice of nonrenewal, \nissuer rating reduction, or other event affecting the availability of a Letter of Credit. \nA draw shall not automatically require replenishment to the amount maintained \nimmediately before the draw. Following any application of drawn proceeds to an \namount due, DesertLink shall recalculate the remaining Cumulative Revenue \nResponsibility and the Operational Security then required under this Article. Eligible \nCustomer shall replenish only the amount, if any, by which the remaining Operational \nSecurity is less than the recalculated Required Security Amount, within fifteen (15) \nBusiness Days after receipt of a Security Notice, or by the applicable in-service date if \nearlier. \nProceeds drawn solely to prevent the expiration or nonrenewal of a Letter of Credit, \nand cash collateral not yet applied to an identified payment obligation, shall remain \nrefundable Security and shall continue to constitute Operational Security until applied \nto an amount then due or released under Section 7.9. Such proceeds and cash collateral \nshall be included in determining the amount of remaining Operational Security and \nshall not create an additional replenishment obligation merely because they are held by \nDesertLink. \nThe posting, drawing, holding, replacement, or replenishment of Operational Security \nshall not, by itself, satisfy the secured obligation, reduce Cumulative Revenue \nResponsibility, or produce a TRBAA Credit. Drawn proceeds of Operational Security \nshall become Applied Security Proceeds only when DesertLink applies them to an \nidentified Supplemental MTRC, prior-period true-up adjustment, Termination Fee, or \nother secured payment obligation arising under Article 6 or Section 3.3.4. Upon \napplication, the proceeds shall reduce that obligation dollar-for-dollar and shall receive \nthe TRBAA treatment required by Section 6.8; provided, however, that Applied \nSecurity Proceeds applied to a Termination Fee shall be administered under Section \n3.3.4 and credited to transmission customer only through the Annual Termination Fee \nCredits provided under Section 6.8. Proceeds of Construction Security applied to Pre-\nIn-Service Termination Costs or other construction-related obligations shall be treated \nas provided in Sections 3.3.2 and 3.3.3. \n7.7. \nSecurity Maintenance. Because Required Operational Security is initially one \nhundred percent (100%) of nominal Remaining Cumulative Revenue Responsibility,"},{"page":322,"startToken":122939,"endToken":123397,"text":"36 \n \nno separate acceleration concept applies. An incorrect, expired, withdrawn, \nunavailable, or materially misleading Retail Security Certification, or the loss of \nenforceable retail-security rights described in it, is a Material Adverse Credit Event. \nEligible Customer shall provide replacement direct Security for any resulting \nuncovered amount within fifteen (15) Business Days after receipt of a Security Notice, \nor by the applicable in-service date if earlier. \n7.8. \nPost-Termination Administration and Cash Collateral. DesertLink shall continue \nthe annual calculations, invoices, and true-ups required under this Agreement \nfollowing termination of service to, or the departure, permanent cessation, or material \nreduction of service by, the Large Load Customer until the Cumulative Revenue \nResponsibility and all other obligations under this Agreement have been finally \nsatisfied, transferred, reassigned, refunded, or otherwise resolved. The Parties intend \nthat cash collateral and proceeds of Security be treated as a deposit or deferred liability \nrather than as a Contribution in Aid of Construction, customer financing of \ntransmission plant, or a reduction to DesertLink’s rate base. To the extent permitted by \napplicable Commission accounting and ratemaking requirements and tax law, \nDesertLink shall record and administer such amounts as the corresponding annual \ncosts and payment obligations arise. The treatment described in this Section is subject \nto the Commission’s Uniform System of Accounts, the Formula Rate, the Protocols, \napplicable Commission orders, and other Applicable Laws and Regulations. If the \nCommission requires a different accounting or ratemaking treatment, DesertLink shall \nimplement the required treatment and make corresponding adjustments necessary to \nprevent duplicate recovery and preserve, to the extent permitted, the economic \nallocation established by this Agreement. The Parties shall cooperate in seeking any \nnecessary Commission authorization or acceptance.  \nNothing in this Agreement guarantees a particular accounting, ratemaking, or tax \nresult. Cash collateral and unapplied Security proceeds shall remain subject to release \nunder Section 7.9, including release to reflect an effective prospective reassignment \nunder Section 6.9. \n7.9. \nRelease of Security. DesertLink shall release excess Operational Security only after \nthe applicable Reconciliation Statement becomes final. DesertLink shall release \nSecurity attributable to an effective prospective reassignment and shall release all \nremaining Security within thirty (30) Calendar Days after final satisfaction of the \nCumulative Revenue Responsibility and all other secured obligations. Termination \nalone does not require release. \n7.10. Security Does Not Limit Liability. The Required Security Amount is based on \nDesertLink’s then-current estimates and calculations and does not cap, replace, or \ndischarge Eligible Customer’s underlying obligations. A shortfall between Security \nand the amount due remains immediately payable to DesertLink. \n7.11. Events of Default; Remedies. Each of the following is an “Event of Default” by \nEligible Customer: (a) failure to pay any undisputed amount when due that continues \nfor ten (10) Business Days after written notice from DesertLink; (b) failure to deliver,"},{"page":323,"startToken":123397,"endToken":123885,"text":"37 \n \nmaintain, replace, restore, or increase Security when required under this Article 7 or \nSchedule 3 that continues after the applicable cure period; (c) any other material \nbreach of this Agreement, including under Section 4.2 or 6.3.6, that continues for \nthirty (30) Calendar Days after written notice from DesertLink or, if the breach cannot \nreasonably be cured within that period, for such longer period, not to exceed ninety \n(90) Calendar Days, as Eligible Customer diligently pursues a cure; and (d) any event \ndescribed in Section 7.6(e). Upon an Event of Default, DesertLink may, subject to \nApplicable Laws and Regulations and the applicable tariffs and agreements: (i) draw \nand apply Security under Section 7.6; (ii) exercise the rights described in Sections \n4.2.6 and 7.2; (iii) before the first Upgrade In-Service Date or Regional Project In-\nService Date, terminate this Agreement under Section 3.3.1; and (iv) pursue any other \nremedy available at law or in equity or before the Commission. No termination after \nan Upgrade In-Service Date or Regional Project In-Service Date releases the \nobligations described in Section 3.3.4. \n8. Force Majeure. \n8.1. \nIf a Party is rendered unable, wholly or in part, by Force Majeure to carry out a \nnonmonetary obligation, that obligation shall be suspended only to the extent and for \nthe period performance is prevented. Force Majeure does not suspend or excuse \npayment of incurred construction costs, Pre-In-Service Termination Costs, \nSupplemental MTRC, the Termination Fee, prior-period true-up adjustments, or the \nmaintenance, replacement, replenishment, or increase of Security. If a Force Majeure \nevent continues for more than twenty (20) Calendar Days in a sixty (60)-Calendar Day \nperiod, the Parties shall meet to address performance; any resulting termination \nremains subject to Sections 3.4 and 3.5.  \n9. Indemnification  \n9.1. \nIndemnity. Each Party (the “Indemnifying Party”) shall at all times indemnify, \ndefend, and hold the other Party and its Affiliates and their respective directors, \nofficers, employees, and agents (each, an “Indemnified Person”) harmless from any \nand all damages, losses, claims, including claims and actions relating to injury to or \ndeath of any person or damage to property, demand, suits, recoveries, costs and \nexpenses, court costs, attorney fees, and all other obligations by or to third parties, \narising out of or resulting from the Indemnifying Party’s actions or omissions in \nperforming its obligations under this Agreement, except to the extent caused by the \ngross negligence or willful misconduct of the Indemnified Person. \n9.1.1. \nIndemnified Person. If an Indemnified Person is entitled to indemnification as a \nresult of a claim by a third party, and the Indemnifying Party fails, after notice \nand reasonable opportunity to proceed, to assume the defense of such claim, such \nIndemnified Person may at the expense of the Indemnifying Party contest, settle \nor consent to the entry of any judgment with respect to, or pay in full, such \nclaim."},{"page":324,"startToken":123885,"endToken":124384,"text":"38 \n \n9.1.2. \nIndemnifying Party. If an Indemnifying Party is obligated to indemnify and \nhold any Indemnified Person harmless, the amount owing to the Indemnified \nPerson shall be the amount of such Indemnified Person’s actual loss, net of any \ninsurance or other recovery. \n9.2. \nIndemnity Procedures. Promptly after receipt by an Indemnified Person of any claim \nor notice of the commencement of any action or administrative or legal proceeding or \ninvestigation as to which the indemnity provided for in Section 9.1 may apply, the \nIndemnified Person shall notify the Indemnifying Party of such fact. Any failure of or \ndelay in such notification shall not affect a Party’s indemnification obligation unless \nsuch failure or delay is materially prejudicial to the Indemnifying Party. \nThe Indemnifying Party shall have the right to assume the defense thereof with \ncounsel designated by such Indemnifying Party and reasonably satisfactory to the \nIndemnified Person. If the defendants in any such action include one or more \nIndemnified Persons and the Indemnifying Party and if the Indemnified Person \nreasonably concludes that there may be legal defenses available to it and/or other \nIndemnified Persons which are different from or additional to those available to the \nIndemnifying Party, the Indemnified Person shall have the right to select separate \ncounsel to assert such legal defenses and to otherwise participate in the defense of \nsuch action on its own behalf. In such instances, the Indemnifying Party shall only be \nrequired to pay the fees and expenses of one additional attorney to represent an \nIndemnified Person or Indemnified Persons having such differing or additional legal \ndefenses. \nThe Indemnified Person shall be entitled, at its expense, to participate in any such \naction, suit or proceeding, the defense of which has been assumed by the Indemnifying \nParty. Notwithstanding the foregoing, the Indemnifying Party (i) shall not be entitled \nto assume and control the defense of any such action, suit or proceedings if and to the \nextent that, in the opinion of the Indemnified Person and its counsel, such action, suit \nor proceeding involves the potential imposition of criminal liability on the Indemnified \nPerson, or there exists a conflict or adversity of interest between the Indemnified \nPerson and the Indemnifying Party, in which event the Indemnifying Party shall pay \nthe reasonable expenses of the Indemnified Person, and (ii) shall not settle or consent \nto the entry of any judgment in any action, suit or proceeding without the consent of \nthe Indemnified Person, which shall not be unreasonably withheld, conditioned or \ndelayed. \n9.3. \nConsequential Damages. Except for amounts expressly payable under Articles 3, 4, \n6, and 7, no Party shall be liable under this Agreement for special, indirect, incidental, \nconsequential, or punitive damages, including lost profit or revenue, loss of use, cost \nof capital, or temporary equipment or services, under any theory of liability. Amounts \nrequired to satisfy the Cumulative Revenue Responsibility, Supplemental MTRC, \nconstruction costs, prior-period true-up adjustments, and Security obligations are \ndirect contractual payment obligations and are not excluded damages."},{"page":325,"startToken":124384,"endToken":124864,"text":"39 \n \n10. Assignment \n10.1. Except for a change in Eligible Customer governed by Section 6.10, a Party may \nassign this Agreement only with the other Party’s written consent; provided that a \nParty may assign to an Affiliate with equal or greater creditworthiness and legal and \noperational capacity to perform. No assignment or change in retail service provider \nreleases the existing Eligible Customer until the assignee or Successor Eligible \nCustomer executes the required assumption, provides required Security, and the \ntransfer becomes effective under the applicable tariffs. Any prohibited assignment is \nvoid, and Security provided by or on behalf of Large Load Customer does not make \nLarge Load Customer the wholesale obligor.  \n11. Disputes \nAll disputes, claims, or controversies arising out of or relating to this Agreement, including \nany dispute concerning the identification or allocation of Large Load-Driven Upgrades or \nCovered Upgrades; any calculation, update, or recalculation of an Estimated Annual MTRC, \nFinal Annual MTRC, Regional Project Allocated ARR, or the MTRC Calculation Template; \nQualifying Transmission Revenues; Supplemental MTRC; Total Required Revenue \nCommitment; Cumulative Revenue Responsibility; TRBAA Credits; Pre-In-Service \nTermination Costs; the Termination Fee; prospective reassignment; or Security, shall be \nresolved under this Article 11, except that a dispute concerning CAISO’s designation of a \nregional project or assignment of a project cost share shall be resolved under the applicable \nCAISO Tariff procedures. Any payment, refund, credit, or other adjustment resulting from the \nresolution of a dispute under this Article 11 shall be implemented as provided in Section 11.5. \n11.1. Submission and Informal Resolution. In the event of a dispute or claim arising out \nof or relating to this Agreement, the disputing Party shall provide the other Party with \na written notice describing the dispute (“Notice of Dispute”). The dispute shall be \nreferred promptly to designated senior representatives for informal resolution. The \nrepresentatives shall meet or confer within ten (10) Business Days and shall use \nreasonable efforts to resolve the matter within thirty (30) Calendar Days after receipt \nof the Notice of Dispute. This informal process is not a condition to seeking \nemergency relief, filing a FERC complaint, or invoking any ADR processes. \n11.2. Alternative Dispute Resolution. If a dispute is not resolved informally, any Party \nmay request Alternative Dispute Resolution (“ADR”). The Parties shall use the ADR \nprocedures, neutral-selection process, confidentiality protections, and timing \nrequirements specified in the applicable FERC rules. ADR shall be conducted by \npersons knowledgeable in electric utility, transmission, and FERC matters and shall \nnot alter a jurisdictional rate, term, or condition unless accepted or approved by the \nFERC. \n11.3. FERC Complaints and Other Rights. Any Party may instead file a complaint, \npetition, or other pleading with the FERC under Section 206 or Section 306 of the \nFederal Power Act, or seek other relief available under the Federal Power Act or \nApplicable Laws and Regulations, and DesertLink may make any filing under Section"},{"page":326,"startToken":124864,"endToken":125356,"text":"40 \n \n205 of the Federal Power Act permitted by Section 12.12. No Party’s participation in \ninformal negotiations or ADR waives or limits its right to seek FERC action. A final \nADR determination affecting jurisdictional rates, terms, conditions, charges, or \nNetwork Upgrades shall be filed with the FERC if required. \n11.4. Costs and Interim Performance. Unless otherwise determined through ADR, the \nParties shall bear their own costs and share neutral costs as specified by the applicable \nADR procedure. During a dispute, each Party shall continue performing undisputed \npayment and operational obligations, and shall pay undisputed amounts when due.  \n11.5. Implementation of Dispute Determinations; TRBAA. Within thirty (30) Calendar \nDays after a dispute under this Article 11 is finally resolved, whether by written \nagreement of the Parties, a final ADR determination (subject to any required \nCommission filing or acceptance), or a final Commission order (each, a “Dispute \nDetermination”), DesertLink shall: (a) update the affected MTRC Calculation \nTemplate, Schedules, Cumulative Revenue Ledger, Reconciliation Statement, and \nRequired Operational Security, as applicable, and serve the updated documents on \nEligible Customer; and (b) invoice or refund, as applicable, any amount owed between \nthe Parties as a result of the Dispute Determination, without interest. To the extent a \nDispute Determination changes a TRBAA Credit or any other amount previously \ncredited to, or recovered from, transmission customers, including any change in \nSupplemental MTRC Receipts or Applied Security Proceeds for a prior Rate Year, \nDesertLink shall record the resulting difference in the TRBA under Section 6.8 and \nflow it through to transmission customers through the TRBAA, and any amount so \nreturned by DesertLink to transmission customers shall include interest as provided in \nSection 5.5 of the TO Tariff. If a final Commission order in a proceeding concerning \nDesertLink’s TRBAA requires a change to any TRBAA Credit attributable to this \nAgreement, DesertLink shall implement that order in the TRBA and shall make any \ncorresponding updates and adjustments between the Parties under this Section 11.5 as \nif the order were a Dispute Determination. Nothing in this Section reopens the Final \nAnnual MTRC or Total Required Revenue Commitment except as required to \nimplement a Dispute Determination or as permitted by Section 6.3.1. \n12. Miscellaneous. \n12.1. Amendment. Except for updates to the MTRC Calculation Template expressly \nauthorized by Section 6.3.1, updates implementing a Dispute Determination under \nSection 11.5, and administrative updates expressly permitted elsewhere in this \nAgreement, this Agreement may be amended only by a written instrument executed by \nthe Parties. An authorized template update shall not change the substantive \nmethodology or other terms of this Agreement. Any material deviation from the \nCommission-accepted pro forma and any unexecuted amendment shall be filed with \nFERC as required by the applicable tariffs and Commission rules.  \n12.2. Entire Agreement. This Agreement, its Schedules, the relevant Interconnection \nAgreement, and other agreements expressly incorporated herein state the Parties’ \ncomplete understanding concerning the wholesale cost recovery mechanism. Nothing"},{"page":327,"startToken":125356,"endToken":125789,"text":"41 \n \nin this Agreement establishes the retail rates, charges, or security arrangements \nbetween Eligible Customer and Large Load Customer. \n12.3. Governing Tariffs and Order of Precedence. This Agreement shall be interpreted \nand administered consistently with the Federal Power Act, applicable Commission \norders, the CAISO Tariff, and the TO Tariff. The CAISO Tariff, the TO Tariff, and \nany other tariff or agreement within the CAISO Requirements that is on file with or \naccepted by the Commission control over this Agreement and its Schedules to the \nextent of an irreconcilable conflict, with each controlling the matters within its \nrespective scope. Nothing in this Agreement shall require a Party or CAISO to take \naction inconsistent with an applicable Commission-accepted tariff, agreement, or \norder. \nSubject to the preceding paragraph: \n(a) the Formula Rate and Protocols shall control the calculation, information \nexchange, and true-up of DesertLink’s Net Revenue Requirement, including the \nrate base treatment of the Covered Upgrades; Section 5.5 of the TO Tariff shall \ncontrol the flow-through of TRBAA Credits to transmission customers through \nthe TRBAA; and any dispute concerning a TRBAA Credit, or any other matter \narising under this Agreement, shall be resolved under Article 11, and any \nresulting adjustment shall be implemented as provided in Section 11.5. The \nMTRC Calculation Template in Schedule 5, and not the Formula Rate or \nProtocols, shall control calculation of the Estimated Annual MTRC and Final \nAnnual MTRC; \n(b) this Agreement shall control the determination and administration of the \nSupplemental MTRC, Cumulative Revenue Responsibility, Operational Security, \nprospective reassignment, and the other wholesale revenue-support obligations \nestablished herein; \n(c) the applicable Interconnection Agreement shall control the physical \ninterconnection, design, engineering, procurement, construction, testing, \nenergization, and operating requirements, except to the extent this Agreement \nexpressly establishes or supplements construction-cost, pre-service termination-\ncost, revenue-support, or Security obligations; provided that the applicable \ninstruments shall be interpreted, to the extent reasonably possible, to give effect \nto both agreements and prevent duplicate recovery; \n(d) each applicable Affected System Arrangement shall control the design, \nconstruction, ownership, operation, cost responsibility, financial security or \ncredit support, and cost recovery applicable to the corresponding Affected \nSystem Upgrade as between the parties to that arrangement. Nothing in this \nAgreement modifies an Affected System Owner’s tariff, makes DesertLink \nresponsible for an obligation of an Affected System Owner, or makes an \nAffected System Owner a Party to this Agreement; \n(e) the body of this Agreement shall control over a Schedule in the event of a \nconflict, except where the Schedule identifies a project-specific election, value, \nmethodology, or term that this Agreement expressly authorizes the Parties to \nestablish in the Schedule; and"},{"page":328,"startToken":125789,"endToken":126253,"text":"42 \n \n(f) the Schedules shall control over other project-specific supporting documents or \nworkpapers that have not been filed with or accepted by the Commission. \nThe Parties shall attempt to interpret the applicable instruments so that each is given \neffect and no provision is rendered superfluous. If an irreconcilable conflict affects a \nCommission-jurisdictional rate, term, or condition, the Parties shall seek any required \nCommission clarification, acceptance, or authorization. Pending resolution, the Parties \nshall continue performing all undisputed obligations. \n12.4. Governing Law. This Agreement shall be interpreted, governed by, and construed \nunder the laws of the State of California, without regard to the principles of conflict of \nlaws thereof, or the laws of the United States, as applicable, as if executed and to be \nperformed wholly within the State of California. \n12.5. Severability. If any term, covenant, or condition of this Agreement or the application \nor effect of any such term, covenant, or condition is held invalid as to any person, \nentity, or circumstance, or is determined to be unjust, unreasonable, unlawful, \nimprudent, or otherwise not in the public interest, by any court or government agency \nof competent jurisdiction, then such term, covenant, or condition shall remain in force \nand effect to the maximum extent permitted by law, and all other terms, covenants, \nand conditions of this Agreement and their application shall not be affected thereby \nbut shall remain in force and effect. The Parties shall be relieved of their obligations \nonly to the extent necessary to eliminate such regulatory or other determination, unless \na court or governmental agency of competent jurisdiction holds that such provisions \nare not severable from all other provisions of this Agreement. \n12.6. No Third Party Beneficiaries. Except for the rights of Large Load Customer and any \nSuccessor Eligible Customer under Section 6.12, this Agreement is not intended to and \ndoes not create rights, remedies, or benefits of any character whatsoever in favor of \nany persons, corporations, associations, or entities other than the Parties, and the \nobligations herein assumed are solely for the use and benefit of the Parties, their \nsuccessors in interest and, where permitted, their assigns. \n12.7. Survival. Expiration or termination of this Agreement shall not affect any right, \nliability, or obligation that accrued before the effective date of expiration or \ntermination or that, by its express terms or nature, is intended to continue thereafter. \nWithout limiting the foregoing, the following shall survive expiration or termination \nfor the period necessary to give them effect: \n(a) all outstanding payment, refund, reimbursement, reconciliation, true-up, Security, \nand release obligations arising under Articles 3, 4, 6, and 7; \n(b) the determination and final satisfaction, transfer, or prospective reassignment of \nthe Cumulative Revenue Responsibility; \n(c) the calculation and implementation of TRBAA Credits and other adjustments \nnecessary to prevent duplicate recovery;"},{"page":329,"startToken":126253,"endToken":126698,"text":"43 \n \n(d) the confidentiality and information-protection obligations applicable under \nSection 6.12, Section 16.3 of the TO Tariff, the CAISO Tariff, and any \napplicable confidentiality agreement; \n(e) the Parties’ rights to obtain, inspect, retain, verify, and challenge books, records, \nmetering data, settlement data, calculations, and supporting workpapers relating \nto periods before expiration or termination; \n(f) the indemnification obligations in Article 9 with respect to acts, omissions, \ncircumstances, or claims arising before expiration or termination; \n(g) the dispute-resolution provisions in Article 11 with respect to any surviving right, \nliability, or obligation; and \n(h) any provision that expressly states that it survives or that must survive to prevent \nduplicate recovery or give effect to the Parties’ rights and obligations. \nSurvival of a provision shall not extend the underlying payment or Security obligation \nbeyond the point at which that obligation has been finally satisfied, transferred, \nreassigned, refunded, or released in accordance with this Agreement. \n12.8. No Waiver. A Party’s delay or failure to exercise any right or remedy under this \nAgreement shall not constitute a waiver of that or any other right or remedy. A waiver \nshall be effective only if stated in a written instrument executed by the Party granting \nthe waiver and shall apply only to the specific matter and circumstances stated therein. \nA waiver on one occasion shall not constitute a continuing waiver or a waiver on any \nother occasion. No course of performance or dealing shall amend this Agreement or \nwaive any Commission-jurisdictional rate, term, or condition. Nothing in this Section \nlimits a Party’s rights under the Federal Power Act or Applicable Laws and \nRegulations. \n12.9. Counterparts and Electronic Signatures. This Agreement, any amendment, and any \nassumption or acknowledgment executed pursuant to it may be executed in \ncounterparts, each of which shall be deemed an original and all of which together shall \nconstitute one instrument. Signatures transmitted electronically, including by portable \ndocument format or an electronic-signature platform, shall have the same force and \neffect as original signatures to the extent permitted by Applicable Laws and \nRegulations. Each Party agrees that it shall not contest the validity or enforceability of \nan instrument solely because it was executed or transmitted electronically. \n12.10. Authority. Each Party represents and warrants that: \n(a) it is duly organized, validly existing, and in good standing under the laws of its \njurisdiction of organization, to the extent such concepts apply; \n(b) it has the requisite power and authority to execute, deliver, and perform this \nAgreement; \n(c) the execution, delivery, and performance of this Agreement have been duly \nauthorized by all necessary organizational action; \n(d) the individual executing this Agreement on its behalf is authorized to do so; and"},{"page":330,"startToken":126698,"endToken":126982,"text":"44 \n \n(e) subject to any required Commission acceptance or other regulatory approval \nexpressly identified in this Agreement, this Agreement constitutes its valid and \nbinding obligation, enforceable in accordance with its terms. \nThe Large Load Customer represents only that the individual executing the Limited \nAcknowledgment is authorized to execute that acknowledgment on its behalf. \nExecution of the Limited Acknowledgment does not make the Large Load Customer a \nParty or expand its obligations beyond those expressly stated in the Limited \nAcknowledgment or in a separate undertaking executed by the Large Load Customer. \n12.11. Notices. All notices, requests, demands, and other communications hereunder (herein \ncollectively called “Notice”) shall be in writing and will be deemed to have been duly \ngiven when (a) personally delivered to the receiving Party’s physical address, (b) sent \nby overnight courier service to the receiving Party’s physical address, or (c) delivered \nvia electronic transmission with a courtesy copy sent by overnight courier service to \nthe receiving Party’s physical address, in each case to the appropriate addresses or \nemail addresses set forth below (or to such other addresses or email addresses as a \nParty may designate by Notice to the other Party); provided that any such deliveries \nreceived after normal business hours in the place of business of the receiving Party \nshall be deemed to be received on the next Business Day: \n \nIf to DesertLink: \n \nDesertLink, LLC \nAttn: Asset Manager \n16150 Main Circle Drive, Suite 310 \nChesterfield, Missouri 63017 \nEmail: rhohlt@lspower.com \n \nWith a copy to: \n \nDesertLink, LLC \nAttn: Legal Department \n16150 Main Circle Drive, Suite 310 \nChesterfield, Missouri 63017 \nEmail: legalnotices@lspower.com \n \nIf to Eligible Customer: \n \n[Company name] \n[Contact name] \n[Address] \nEmail: [Insert] \nIf to Large Load Customer: \n[Company name]"},{"page":331,"startToken":126982,"endToken":127178,"text":"45 \n \n[Contact name] \n[Address] \nEmail: [Insert] \n12.12. Reservation of Rights. DesertLink shall have the right to make a unilateral filing with \nthe Commission under Section 205 of the Federal Power Act to modify this \nAgreement or the pro forma form of this Agreement, and Eligible Customer shall have \nthe right to make a unilateral filing with the Commission under Section 206 of the \nFederal Power Act to modify this Agreement. Each Party shall have the right to protest \nany such filing and to participate fully in any proceeding before the Commission. The \nstandard of review for any proposed change to this Agreement, whether proposed by a \nParty, a non-party, or the Commission acting on its own motion, shall be the just and \nreasonable standard under Sections 205 and 206 of the Federal Power Act. \n \n13. Project-Specific Schedules \n13.1. Required Schedules. Each executed Agreement shall include the following completed \nschedules, which are incorporated into this Agreement. \nSchedule 1 — Project and Allocation Data; \nSchedule 2 — Qualifying Transmission Revenues Methodology; \nSchedule 3 — Credit and Security Standards; \nSchedule 4 — CAISO Regional Project Allocation and Responsibility; and \nSchedule 5 — MTRC Calculation Template and Cumulative Revenue Ledger \n[Signature page follows.]"},{"page":332,"startToken":127178,"endToken":127315,"text":"46 \n \nIN WITNESS WHEREOF, the Parties have caused this Agreement to be duly executed by their \nduly authorized officers as of the day and year first above written. \n \nDESERTLINK, LLC \nBy: __________________________ \nName: ________________________ \nTitle: _________________________ \nDate: _________________________ \n[ELIGIBLE CUSTOMER] \nBy: __________________________ \nName: ________________________ \nTitle: _________________________ \nDate: _________________________ \n \nLIMITED ACKNOWLEDGMENT OF LARGE LOAD CUSTOMER \nLarge Load Customer acknowledges the assignment of cost responsibility to its facility and \nagrees to provide information and notices, authorize release of metering and settlement data, and \ncooperate in a transition to a Successor Eligible Customer. This acknowledgment does not make \nLarge Load Customer the wholesale obligor, establish a FERC-jurisdictional retail rate, or \nconstitute a guarantee of Eligible Customer’s payment obligations. Any separate guarantee or \ncollateral undertaking by Large Load Customer shall be governed by its own terms and filed \nwith FERC if required. \n[LARGE LOAD CUSTOMER] \nBy: __________________________ \nName: ________________________ \nTitle: _________________________ \nDate: _________________________"},{"page":333,"startToken":127315,"endToken":127453,"text":"Schedule 1 - 1 \n \nSchedule 1 \nProject and Allocation Data \n1. Purpose \nThis Schedule identifies the Large Load Facility, the applicable service request, each Large \nLoad-Driven Upgrade covered by this Agreement, the initial allocation of each Large Load-\nDriven Upgrade, and the applicable construction and operational security information. This \nSchedule is incorporated into and made part of the Agreement. \n2. Large Load Facility and Service Information \nLarge Load Customer \n[●] \nEligible Customer \n[●] \nLarge Load Facility \n[Name and description] \nPhysical Location of Large \nLoad Facility \n[●] \nPoint of Interconnection \n[●] \nMetering Point or Settlement \nIdentifier \n[●] \nRequested Service Level \n[●] MW \nRequested Service Phases \n[Identify the MW and expected commencement date of \neach phase] \nExpected Large Load Service \nCommencement Date \n[●] \nOutside Date \n[●] \nApplicable Study or \nAuthorization \n[Study name, number, version, and date] \nApplicable Interconnection, \nTransmission Service, or Other \nAgreement \n[●] \nCAISO or Other Relevant \nProject Identifier \n[●]"},{"page":334,"startToken":127453,"endToken":127506,"text":"Schedule 1 - 2 \n \n3. Large Load-Driven Upgrade Information \nEach Large Load-Driven Upgrade shall be identified separately. \nUpgrade 1 \nUpgrade Description \n[●] \nApplicable Study or \nAuthorization \n[●] \nOwner and Construction \nResponsibility \n[●] \nInitial Estimated Capital Cost \n$[●] \nExpected Construction \nCommencement Date \n[●] \nExpected Upgrade In-Service \nDate \n[●] \nActual Upgrade In-Service Date [●] \nMTRC Term End Date \n[●] \nShared, Phased, or Dependent \nFacility \n[●]"},{"page":335,"startToken":127506,"endToken":127583,"text":"Schedule 1 - 3 \n \nUpgrade 2 \nUpgrade Description \n[●] \nApplicable Study or \nAuthorization \n[●] \nOwner and Construction \nResponsibility \n[●] \nInitial Estimated Capital Cost \n$[●] \nExpected Construction \nCommencement Date \n[●] \nExpected Upgrade In-Service \nDate \n[●] \nActual Upgrade In-Service Date [●] \nMTRC Term End Date \n[●] \nShared, Phased, or Dependent \nFacility \n[●] \n \nUpgrade 3 \nUpgrade Description \n[●] \nApplicable Study or \nAuthorization \n[●] \nOwner and Construction \nResponsibility \n[●] \nInitial Estimated Capital Cost \n$[●] \nExpected Construction \nCommencement Date \n[●] \nExpected Upgrade In-Service \nDate \n[●] \nActual Upgrade In-Service Date [●] \nMTRC Term End Date \n[●] \nShared, Phased, or Dependent \nFacility \n[●]"},{"page":336,"startToken":127583,"endToken":127732,"text":"Schedule 1 - 4 \n \n4. Initial Allocation and Annual MTRC Information \nFor each Large Load-Driven Upgrade, the Initial Allocation Percentage assigned to the Large \nLoad Customer under this Agreement shall be identified below. The sum of the percentages \nallocated to all Large Load Customers for a Large Load-Driven Upgrade shall not exceed one \nhundred percent (100%). \nUpgrade 1 \nInitial Estimated Annual \nMTRC Attributable to Covered \nUpgrade \n$[●] \nInitial Allocation Percentage \nAssigned to This Large Load \nCustomer \n[●]% \nInitial Estimated Annual \nMTRC Allocated to This Large \nLoad Customer \n$[●] \nAggregate Initial Allocation \nPercentage Assigned to All \nLarge Load Customers \n[●]% \nPercentage Allocated to Other \nSystem Needs or Customers \n[●]% \n \nUpgrade 2 \nInitial Estimated Annual \nMTRC Attributable to Covered \nUpgrade \n$[●] \nInitial Allocation Percentage \nAssigned to This Large Load \nCustomer \n[●]% \nInitial Estimated Annual \nMTRC Allocated to This Large \nLoad Customer \n$[●] \nAggregate Initial Allocation \nPercentage Assigned to All \nLarge Load Customers \n[●]% \nPercentage Allocated to Other \nSystem Needs or Customers \n[●]%"},{"page":337,"startToken":127732,"endToken":127895,"text":"Schedule 1 - 5 \n \nUpgrade 3 \nInitial Estimated Annual \nMTRC Attributable to Covered \nUpgrade \n$[●] \nInitial Allocation Percentage \nAssigned to This Large Load \nCustomer \n[●]% \nInitial Estimated Annual \nMTRC Allocated to This Large \nLoad Customer \n$[●] \nAggregate Initial Allocation \nPercentage Assigned to All \nLarge Load Customers \n[●]% \nPercentage Allocated to Other \nSystem Needs or Customers \n[●]% \n \nAny portion of a Large Load-Driven Upgrade not allocated to a Large Load Customer shall be \nexcluded from the Annual MTRC allocable to any Large Load Customer and shall remain \nsubject to otherwise-applicable CAISO cost allocation and rate recovery requirements. \n5. Allocation Methodology and Capability Basis \nThe Initial Allocation Percentage for each Large Load-Driven Upgrade is supported by the \nfollowing study findings and allocation methodology: \nUpgrade 1 \nCustomers or Projects Studied \nTogether \n[●] \nAllocation Methodology \n[●] \nRequested Service or Electrical \nImpact Used in Allocation \n[●] \nIncremental Capability Created \nby Upgrade, if Quantified \n[●] MW or other applicable measure \nCapability Initially Assigned to \nThis Large Load Customer \n[●] \nExplanation of Any Percentage \nAllocated to Other System \nNeeds or Customers \n[●]"},{"page":338,"startToken":127895,"endToken":128059,"text":"Schedule 1 - 6 \n \nUpgrade 2 \nCustomers or Projects Studied \nTogether \n[●] \nAllocation Methodology \n[●] \nRequested Service or Electrical \nImpact Used in Allocation \n[●] \nIncremental Capability Created \nby Upgrade, if Quantified \n[●] MW or other applicable measure \nCapability Initially Assigned to \nThis Large Load Customer \n[●] \nExplanation of Any Percentage \nAllocated to Other System \nNeeds or Customers \n[●] \n \nUpgrade 3 \nCustomers or Projects Studied \nTogether \n[●] \nAllocation Methodology \n[●] \nRequested Service or Electrical \nImpact Used in Allocation \n[●] \nIncremental Capability Created \nby Upgrade, if Quantified \n[●] MW or other applicable measure \nCapability Initially Assigned to \nThis Large Load Customer \n[●] \nExplanation of Any Percentage \nAllocated to Other System \nNeeds or Customers \n[●] \n \nThe allocation methodology shall account for, as applicable: \n(a) Large Load Customers studied individually, jointly, or in a cluster; \n(b) the extent to which two or more Large Load Customers caused the need for or share a \nLarge Load-Driven Upgrade; \n(c) differing requested service levels, electrical impacts, development phases, and facility \nconfigurations; \n(d) facilities constructed in phases or placed in service on different dates; and"},{"page":339,"startToken":128059,"endToken":128165,"text":"Schedule 1 - 7 \n \n(e) any portion of a facility determined at the outset to serve other system needs or \ncustomers. \n6. Initial Cumulative Revenue Responsibility and Security Information \nUpgrade 1 \nInitial Projected Cumulative \nRevenue Responsibility \n$[●] \nConstruction Security \nAttributable to Upgrade \n$[●] \nDate Operational Security Must \nBecome Effective \n[●] \nInitial Projected Incremental \nOperational Security \nAttributable to Upgrade \n$[●] \n \nUpgrade 2 \nInitial Projected Cumulative \nRevenue Responsibility \n$[●] \nConstruction Security \nAttributable to Upgrade \n$[●] \nDate Operational Security Must \nBecome Effective \n[●] \nInitial Projected Incremental \nOperational Security \nAttributable to Upgrade \n$[●] \nUpgrade 3 \nInitial Projected Cumulative \nRevenue Responsibility \n$[●] \nConstruction Security \nAttributable to Upgrade \n$[●] \nDate Operational Security Must \nBecome Effective \n[●] \nInitial Projected Incremental \nOperational Security \nAttributable to Upgrade \n$[●]"},{"page":340,"startToken":128165,"endToken":128638,"text":"Schedule 1 - 8 \n \n \nThe Initial Projected Cumulative Revenue Responsibility stated above represents the initial \nprojection of the Total Required Revenue Commitment for the applicable Large Load-Driven \nUpgrade, calculated as the Estimated Annual MTRC multiplied by twenty (20) using the MTRC \nCalculation Template in Schedule 5. \nConstruction Security shall remain applicable separately to each Large Load-Driven Upgrade \nuntil that upgrade reaches its Upgrade In-Service Date and the applicable conditions for release \nor conversion under Section 7.2 have been satisfied. \nOperational Security must be fully effective before the applicable Upgrade In-Service Date. If \ndifferent Large Load-Driven Upgrades are expected to reach their Upgrade In-Service Dates on \ndifferent dates, DesertLink shall recalculate the required Operational Security before each \nsubsequent Upgrade In-Service Date in accordance with Article 7. \n7. Schedule Qualifications \n7.1 Projected Amounts. The capital costs, Estimated Annual MTRC, projected Total \nRequired Revenue Commitment, Cumulative Revenue Responsibility, and Operational Security \namounts stated in this Schedule are initial projections provided for planning and administration \npurposes. They do not constitute fixed amounts, caps, or guarantees.  \n7.2 Initial and Applicable Allocation Percentages. The Initial Allocation Percentage \nidentified for each Large Load-Driven Upgrade shall remain the initial allocation of that upgrade \nto the Large Load Customer. The Applicable Allocation Percentage shall equal the Initial \nAllocation Percentage, as adjusted prospectively by any reassignment effective under Section 6.9 \nor as otherwise required by a final Commission order or applicable tariff provision. \nA change in capital costs, the Upgrade In-Service Date, Formula Rate inputs, or the annual \nrevenue requirement shall not, by itself, change the Initial Allocation Percentage or Applicable \nAllocation Percentage. Cancellation, abandonment, downsizing, curtailment, permanent \ncessation, or material reduction of service by the Large Load Customer also shall not, by itself, \nreduce either percentage. \n7.3 Allocation Limitation. The aggregate Annual MTRC assigned to all Large Load \nCustomers for a Covered Upgrade shall not exceed one hundred percent (100%) of the Annual \nMTRC for that Covered Upgrade. DesertLink shall not allocate the same upgrade cost, \ntransmission capability, or annual revenue requirement to more than one Large Load Customer. \n7.4 Upgrade In-Service Dates and MTRC Term End Dates. Each Expected Upgrade In-\nService Date stated in this Schedule is a planning estimate. DesertLink shall provide written \nnotice to Eligible Customer of a material change to an Expected Upgrade In-Service Date. \nWithin five (5) Business Days after a Covered Upgrade achieves its Upgrade In-Service Date, \nDesertLink shall provide written notice to Eligible Customer stating the actual Upgrade In-\nService Date and the corresponding MTRC Term End Date. DesertLink shall update this \nSchedule and the applicable Cumulative Revenue Ledger to reflect those dates. The actual \nUpgrade In-Service Date shall be determined in accordance with the definition of that term in the \nAgreement. Inclusion of pre-service Construction Work in Progress in rate base does not \nconstitute an Upgrade In-Service Date."},{"page":341,"startToken":128638,"endToken":129006,"text":"Schedule 1 - 9 \n \n7.5 Annual Updates. Changes in the Estimated Annual MTRC, Final Annual MTRC, Total \nRequired Revenue Commitment, Cumulative Revenue Responsibility, Supplemental MTRC, \nQualifying Transmission Revenues, or Operational Security resulting from the MTRC \nCalculation Template in Schedule 5, the Annual Projection, the Annual Update and \nReconciliation Statement, or an effective prospective reassignment under Section 6.9 do not \nrequire an amendment to this Schedule. \n7.6 Prospective Reassignment. DesertLink shall maintain the customer-, project-, and \nupgrade-specific ledger required by Sections 6.7 and 6.9. Any prospective reassignment shall be \nreflected in that ledger and in the applicable Annual Projection and Reconciliation Statement. A \nprospective reassignment shall adjust the Applicable Allocation Percentage but shall not revise \nthe Initial Allocation Percentage, produce a historical refund, or reopen a prior Rate Year. \n7.7 Updated Expected Dates. An update to an expected construction commencement date, \nExpected Upgrade In-Service Date, or expected Large Load Service Commencement Date may \nbe made by written notice and does not require an amendment to this Schedule unless the update \nalso changes a material rate, term, condition, facility scope, or allocation established by this \nAgreement. \n8. Supporting Materials \nThe following supporting materials are attached to or incorporated by reference into this \nSchedule: \n1. the applicable final transmission study or studies; \n2. the facilities list and cost estimate supporting each Large Load-Driven Upgrade; \n3. the study-based allocation methodology and calculations; \n4. the initial Annual MTRC and Total Required Revenue Commitment workpapers (per \nSchedule 5); \n5. the initial Cumulative Revenue Responsibility calculation; \n6. the Construction Security calculation; \n7. the initial projected Operational Security calculation; \n8. any applicable project diagrams, metering diagrams, or service-phase schedules; and \n9. each applicable Affected System study, Affected System Arrangement, and evidence of \nrequired financial security or credit support. \n9. Affected System Information \nThe following information shall be completed for each potential or confirmed Affected System. \nEligible Customer shall update the information and provide the documentation required by \nSection 4.2 if an Affected System or Affected System Upgrade is identified or the status of an \nAffected System Arrangement changes. \n1. Affected System Owner: [●] \n2. CAISO Participating TO or External Affected System: [●] \n3. Applicable Study and Project Identifier: [●] \n4. Identified System Impact: [●]"},{"page":342,"startToken":129006,"endToken":129122,"text":"Schedule 1 - 10 \n \n5. Affected System Upgrade: [●] \n6. Estimated Cost: $[●] \n7. Affected System Arrangement: [Agreement name, parties, and date] \n8. Required Construction Financial Security or Credit Support: $[●] \n9. Required Post-In-Service Financial Security or Credit Support: $[●] \n10. Commission Filing or Acceptance Required: [Yes/No; docket and status] \n11. Deadline for Delivery to DesertLink: [●] \n12. Current Status: [Pending/Executed/Effective] \n13. If no Affected System or Affected System Upgrade has been identified when this \nSchedule is executed, insert the following certification: \nNo Affected System or Affected System Upgrade has been identified as of [date]. This \nstatement does not limit Eligible Customer’s continuing obligations under Section 4.2 if \nan Affected System or Affected System Upgrade is subsequently identified."},{"page":343,"startToken":129122,"endToken":129415,"text":"Schedule 2 - 1 \n \nSchedule 2 \nQualifying Transmission Revenues Methodology \n1. Purpose and Controlling Principles \nThis Schedule establishes the reproducible methodology for calculating projected and actual \nQualifying Transmission Revenues attributable to the Large Load Facility. It is intended to \nidentify wholesale transmission revenues paid by or on behalf of Eligible Customer that are \nattributable to the Large Load Facility and reduce transmission revenues otherwise collected \nfrom CAISO customers or directly credit DesertLink’s Net Revenue Requirement. Such \nrevenues may include applicable TAC revenues and qualifying Wheeling Access Charges or \nother wholesale transmission-access, wheeling, or transmission-service charges under the \nCAISO Tariff or another Commission-accepted arrangement, including charges paid through a \nnon-PTO serving entity. The Supplemental MTRC therefore measures only the remaining \nshortfall below the applicable Annual MTRC. \nQualifying Transmission Revenues shall be counted once in calculating the Supplemental MTRC \nand the Cumulative Revenue Responsibility against the combined Annual MTRC for all Covered \nUpgrades. They shall not also be treated as a TRBAA Credit under Section 6.8 because they \nreduce transmission revenues otherwise collected from CAISO customers. This Schedule does \nnot modify CAISO settlement rules, establish a retail rate, impose any obligation on CAISO, or \nalter any cost allocation established under the CAISO Requirements. \n2. Project and Settlement Identifiers \nThe following information shall be completed for each Large Load Facility and updated \nadministratively when a meter, settlement identifier, Eligible Customer, or other listed item \nchanges. An administrative update that does not alter the Commission-accepted methodology \ndoes not require an amendment to the Agreement unless a filing is otherwise required by \nApplicable Laws and Regulations. \nLarge Load Customer \n[●] \nLarge Load Facility \n[●] \nPhysical location and applicable \nCAISO or out-of-state service \narea \n[●] \nEligible Customer at service \ncommencement \n[●] \nScheduling Coordinator \n[●] \nUtility Distribution Company, \nMetered Subsystem, or non-\nPTO serving entity \n[●]"},{"page":344,"startToken":129415,"endToken":129710,"text":"Schedule 2 - 2 \n \nCAISO resource, settlement, or \nload identifier(s) \n[●] \nRevenue-quality meter \nidentifier(s) and location(s) \n[●] \nMetering point used for this \ncalculation \n[●] \nLarge Load Service \nCommencement Date \n[●] \nApplicable TAC, Wheeling \nAccess Charge, or other CAISO \nTariff charge(s) \n[●] \nPrimary source of settlement \nand metering data \n[●] \n \n3. Data Sources and Responsibilities \n(a) DesertLink shall calculate projected and actual Qualifying Transmission Revenues using \nthe best available data from CAISO settlement statements, wheeling, transmission-access, \nand transmission service invoices, revenue-quality meter data, Eligible Customer and \nnon-PTO serving entity billing records, Scheduling Coordinator records, and other data \nmade available under the CAISO Tariff, another Commission-accepted arrangement, or \nauthorized by Eligible Customer and Large Load Customer. \n(b) Eligible Customer shall provide, or cause its Scheduling Coordinator, Utility Distribution \nCompany, Metering Coordinator, or other authorized agent to provide, all information \nreasonably necessary to identify and verify withdrawals attributable to the Large Load \nFacility. Eligible Customer shall maintain all authorizations reasonably necessary for \nrelease of that information. \n(c) The Large Load Customer shall provide the information and authorizations required by \nits Limited Acknowledgment, including information needed to distinguish the Large \nLoad Facility from other load behind a common meter or within a common settlement \nidentifier. \n(d) DesertLink may use CAISO data made available under the CAISO Requirements or \nthrough the authorizations provided under this Agreement. Nothing in this Schedule \nmakes CAISO a party to the Agreement or independently requires CAISO to calculate, \ninvoice, collect, or administer the Supplemental MTRC. \n(e) If final data are unavailable when a projection, invoice, Annual Update, or Reconciliation \nStatement is due, DesertLink may use a reasonable estimate based on the most recent \navailable data, the service forecast, applicable TAC rates, and known settlement \nadjustments. Estimated amounts shall be replaced with actual data in the next practicable \nreconciliation."},{"page":345,"startToken":129710,"endToken":130141,"text":"Schedule 2 - 3 \n \n4. Applicable Withdrawals \nFor each CAISO settlement interval or other reproducible billing interval, Applicable \nWithdrawals shall equal the metered energy withdrawals attributable to the Large Load Facility \nat the metering point identified in Section 2 of this Schedule, expressed in MWh and adjusted as \nfollows: \n(a) Imports, exports, station service, auxiliary load, behind-the-meter generation, storage \ncharging and discharging, and other injections or withdrawals shall be treated \nconsistently with the manner in which they are recognized for the applicable TAC charge \nunder the CAISO Tariff. \n(b) Distribution losses and transmission losses shall be included only to the extent they are \nincluded in the billing determinant for the applicable TAC component. The loss factor or \nmethod shall be identified in the project-specific table in Section 10 of this Schedule. \n(c) If the Large Load Facility shares a meter or settlement identifier with other load, the \nwithdrawals attributable to the Large Load Facility shall be determined from revenue-\nquality submeters or another objective allocation method identified in Section 10 of this \nSchedule. An allocation based solely on estimates may be used temporarily but shall be \nreconciled when reliable data become available. \n(d) Withdrawals shall not be counted for a period before the corresponding Annual MTRC is \nincluded in the Supplemental MTRC calculation under Section 6.4 of the Agreement, \nexcept where necessary to correct a prior-period error or resettlement. \n5. Applicable TAC Revenue \nApplicable TAC Revenue for an interval shall equal Applicable Withdrawals multiplied by the \nCAISO transmission rate or rates actually applicable to those withdrawals for that interval. The \ncalculation shall include only transmission charge components that contribute to recovery of the \nrevenue requirement in which DesertLink’s costs are included. It shall exclude retail distribution \ncharges, generation charges, non-transmission surcharges, taxes collected for another \ngovernmental entity, and any other charge that does not contribute to recovery of DesertLink’s \ntransmission revenue requirement. \nIf CAISO uses a monthly, annual, or other non-interval billing determinant, DesertLink shall \nperform the calculation using that same billing period and determinant. If more than one TAC \nrate or component applies, each component shall be calculated separately before applying the \nDesertLink Allocation Factor. \n6. DesertLink Allocation Factor \nThe DesertLink Allocation Factor shall identify the portion of Applicable TAC Revenue \nallocable to DesertLink for the relevant period. Unless a different Commission-accepted method \nis stated in Section 10 of this Schedule, the factor shall be calculated from the same revenue \nrequirement, billing determinant, allocation percentage, and other inputs used by CAISO to \ninclude DesertLink’s net transmission revenue requirement in the applicable TAC rate. \nFor each applicable rate component and period:"},{"page":346,"startToken":130141,"endToken":130566,"text":"Schedule 2 - 4 \n \nDesertLink Allocation Factor = DesertLink Net Revenue Requirement included in the \napplicable TAC component ÷ Total Net Revenue Requirement recovered through that TAC \ncomponent. \nIf DesertLink’s revenue requirement is recovered through a project-specific, zonal, or other \ndirect allocation rather than a systemwide factor, the corresponding Commission-accepted \nallocation percentage or rate component shall be used. The supporting workpapers shall identify \nthe source and calculation of each factor. \n7. Calculation of Qualifying Transmission Revenues \nProjected and actual Qualifying Transmission Revenues shall be calculated as follows for each \napplicable interval, month, or billing period and then aggregated for the Rate Year or partial Rate \nYear: \nQualifying Transmission Revenues =  Qualifying TAC Revenue + Qualifying Wheeling and \nOther Wholesale Transmission Revenues ± Applicable Adjustments. \nQualifying TAC Revenue = Σ [(Applicable Withdrawals × Applicable TAC Rate) × DesertLink \nAllocation Factor]. Qualifying Wheeling and Other Wholesale Transmission Revenues equal \nWheeling Access Charges and other wholesale transmission-access, wheeling, or transmission-\nservice charges actually paid by or on behalf of Eligible Customer to CAISO, a Participating TO, \nor a non-PTO transmission or load-serving entity for deliveries serving the Large Load Facility, \nbut only to the extent those revenues reduce transmission revenues otherwise collected through \nTAC or directly credit DesertLink’s Net Revenue Requirement. Applicable Adjustments shall \ninclude only amounts attributable to the Large Load Facility, including CAISO resettlements, \nbilling corrections, refunds, charge reversals, balancing-account adjustments, and other \nadjustments that change the qualifying transmission revenue. Bad debt or uncollectible amounts \nshall reduce Qualifying Transmission Revenues only to the extent the corresponding revenue is \nnot recovered from another source and is not otherwise included in DesertLink’s Formula Rate \nrecovery. \n8. Projections, Actuals, Resettlements, and Customer Changes \n(a) The Annual Projection shall use forecast withdrawals, then-effective or forecast TAC \nrates, the most recent DesertLink Allocation Factor, and known adjustments. The \nworkpapers shall separately identify each material assumption. \n(b) The Reconciliation Statement shall replace projected values with actual withdrawals, \nrates, factors, and adjustments for the applicable period. CAISO resettlements or other \ncorrections received after a Reconciliation Statement becomes final shall be reflected in \nthe next practicable Reconciliation Statement and Annual Update, subject to Section 6.6 \nof the Agreement, and any dispute concerning them shall be resolved under Article 11 of \nthe Agreement. \n(c) A change in Eligible Customer, Scheduling Coordinator, or retail service provider shall \nnot interrupt the calculation or cause the same withdrawals or revenues to be omitted or \ncounted more than once. Qualifying Transmission Revenues shall remain associated with \nthe Large Load Customer and Large Load Facility, regardless of which Eligible \nCustomer is responsible for payment during the applicable period."},{"page":347,"startToken":130566,"endToken":130810,"text":"Schedule 2 - 5 \n \n(d) If two or more Eligible Customers serve the Large Load Facility during a Rate Year, the \nQualifying Transmission Revenues and corresponding Supplemental MTRC shall be \nassigned between them based on the periods during which each provided service, unless \nthe applicable transition agreement provides another Commission-accepted allocation. \n9. Workpapers, Verification, and Records \nWith each Annual Projection and Reconciliation Statement, DesertLink shall provide \nworkpapers sufficient for Eligible Customer to reproduce the calculation, including applicable \nmeter quantities, TAC rates, DesertLink Allocation Factors, adjustments, source references, and \na reconciliation to the corresponding Supplemental MTRC and Cumulative Revenue Ledger. \nCustomer-specific or commercially sensitive information may be provided subject to the \nconfidentiality provisions of Section 16.3 of the TO Tariff, the CAISO Tariff, and any applicable \nconfidentiality agreement. \nDesertLink, Eligible Customer, and Large Load Customer shall retain supporting records for the \nperiod required by the CAISO Tariff, Commission regulations, and Applicable Laws and \nRegulations, and in all events until completion of any timely initiated review, audit, or dispute \nconcerning the applicable Rate Year. Any dispute concerning the calculation shall be resolved \nunder Article 11 of the Agreement. \n10. Project-Specific Methodology Elections \nApplicable Withdrawals \nmethodology \n[●] \nTreatment of shared meters or \nidentifiers \n[●] \nTreatment of behind-the-meter \ngeneration and storage \n[●] \nApplicable TAC, Wheeling \nAccess Charge, or other CAISO \nTariff rate component(s) \n[●] \nDesertLink Allocation Factor \nmethodology \n[●] \nLoss factor or loss methodology \n[●] \nTreatment of exports and \nstation service \n[●] \nTreatment of refunds and \nresettlements \n[●] \nTreatment of bad debt or \nuncollectible amounts \n[●]"},{"page":348,"startToken":130810,"endToken":130968,"text":"Schedule 2 - 6 \n \nProjection methodology \n[●] \nData-delivery process and \ntiming \n[●] \nOther Commission-accepted \nproject-specific provision \n[●] \n \nThe methodology shall specify the metering point, applicable local and regional TAC \ncomponents, DesertLink allocation factor, applicable Wheeling Access Charges or other \nwholesale transmission access, wheeling, or transmission charges, the identity of any non-PTO \nserving entity collecting the charge, the basis for attributing each charge to the Large Load \nFacility, and evidence that the charge reduces transmission revenues otherwise collected through \nTAC or directly credits DesertLink’s Net Revenue Requirement. It also shall specify treatment of \nlosses, refunds, resettlements, bad debt and balancing-account adjustments, treatment of a \nchange in Eligible Customer, the source of billing and meter data, and the calculation and \nverification of projected and actual revenue. Qualifying Transmission Revenues count toward the \nannual and cumulative responsibility but are not separately credited against DesertLink’s \ntransmission revenue requirement because they already reduce transmission revenues otherwise \ncollected from CAISO customers or directly credit DesertLink’s Net Revenue Requirement."},{"page":349,"startToken":130968,"endToken":131295,"text":"Schedule 3 - 1 \n \n \nSchedule 3 \nCredit and Security Standards \n1. Purpose and Application \nThis Schedule establishes the forms, delivery, maintenance, replacement, draw, application, and \nrelease requirements for all Construction Security and Operational Security required under \nArticle 7. Except for the limited reduction of direct Operational Security provided in Section 3, \nall Security shall be provided directly by Eligible Customer. \n2. Permitted Forms of Security \nEligible Customer may provide Security in the form of cash, a Letter of Credit, or any \ncombination thereof. DesertLink may accept another form of Security if it determines, in its sole \ndiscretion, that the form is acceptable. \nCash collateral shall be delivered in immediately available funds to an account designated by \nDesertLink and shall count dollar-for-dollar toward the applicable Required Security Amount \nwhile held by DesertLink. \n(a) Construction Security \nEligible Customer shall provide and maintain all Construction Security directly in one or more \nforms permitted under this Section 2. A Retail Security Certification and Qualifying Retail \nSecurity Support shall not constitute, reduce, replace, or satisfy Construction Security or any Pre-\nIn-Service Termination Costs. \n(b) Operational Security \nExcept to the extent reduced under Section 3, Eligible Customer shall provide and maintain \ndirect Operational Security in one or more forms permitted under this Section 2 in an amount \nequal to one hundred percent (100%) of the nominal Remaining Cumulative Revenue \nResponsibility. \n3. Retail Security Certification \nA current Retail Security Certification reduces the direct Operational Security requirement \ndollar-for-dollar by the amount of Qualifying Retail Security Support identified in that \ncertification. It does not reduce Eligible Customer’s underlying obligations, constitute Security \nposted directly with DesertLink, or apply to Construction Security or Pre-In-Service Termination \nCosts. \nEach Retail Security Certification must be substantially in the form of Exhibit A contained in \nSchedule 3 of this Agreement. Eligible Customer shall deliver a Retail Security Certification \nbefore first relying on Qualifying Retail Security Support to reduce the direct Operational \nSecurity requirement. The Retail Security Certification shall remain effective unless and until"},{"page":350,"startToken":131295,"endToken":131730,"text":"Schedule 3 - 2 \n \nsuperseded, withdrawn, or deemed ineffective under this Agreement. Eligible Customer shall \ndeliver an updated Retail Security Certification within three (3) Business Days after any \nreduction, draw, expiration, nonrenewal, termination, amendment, loss of enforceable draw or \napplication rights, or other event that could impair the certified support. \nWith each Reconciliation Statement, DesertLink may identify the amount of Qualifying Retail \nSecurity Support then reflected in calculating Required Operational Security. That identification \ndoes not require Eligible Customer to deliver a new Retail Security Certification unless an event \nrequiring an update has occurred. \nDesertLink may rely on the certification without reviewing the underlying retail security \ndocuments in the ordinary course, but may request supporting information after a payment \ndefault, Credit Review Event, Material Adverse Credit Event, or reasonable basis to question the \ncertification. \n4. Letter of Credit Requirements \nIf Eligible Customer provides a Letter of Credit as Security, the Letter of Credit must be \nirrevocable, unconditional, transferable, payable at sight, and permit partial and multiple draws. \nIt must be issued by a major United States commercial bank or United States branch of a major \nforeign commercial bank rated at least A- by S&P, A3 by Moody’s, or A- by Fitch, in each case \nby at least two of those three agencies, and otherwise be in form and substance reasonably \nacceptable to DesertLink. \nEach Letter of Credit must have an initial stated term of at least twelve (12) months and provide \nDesertLink at least ninety (90) Calendar Days’ prior written notice of nonrenewal. Eligible \nCustomer shall provide a conforming extension, replacement Letter of Credit, cash collateral, or \nother Security accepted by DesertLink no later than sixty (60) Calendar Days before the \napplicable expiration date following a notice of nonrenewal, and within fifteen (15) Business \nDays after an issuer rating reduction. \nIf Eligible Customer fails to timely provide the required replacement or substitute Security, \nDesertLink may, before the applicable Letter of Credit expires, draw all or any portion of the \nthen-available amount and retain the proceeds as cash collateral, apply the proceeds to secured \nobligations, or both. \n5. Security Notices; Maintenance; and Replenishment \nDesertLink may issue a Security Notice whenever it reasonably determines that the Required \nSecurity Amount exceeds available Security, including as a result of a draw, application of cash \ncollateral, change in the Required Security Amount, loss of Qualifying Retail Security Support, \nor other event affecting Security availability. \nEligible Customer shall provide any required increase, restoration, replacement, or other cure \nwithin fifteen (15) Business Days after receipt of the Security Notice, or by the applicable in-\nservice date if earlier. \n6. Draws; Application; and Release"},{"page":351,"startToken":131730,"endToken":131889,"text":"Schedule 3 - 3 \n \nDesertLink may draw against a Letter of Credit, apply cash collateral, or apply another accepted \nform of Security as permitted under Article 7. A draw, the holding of proceeds or cash collateral, \nor replenishment does not by itself satisfy an obligation or reduce Cumulative Revenue \nResponsibility. Proceeds of Operational Security become Applied Security Proceeds only when \napplied to an identified secured obligation as provided in Section 7.6; proceeds of Construction \nSecurity are treated as provided in Sections 3.3.2 and 3.3.3. \nDesertLink shall release excess Security after the applicable Reconciliation Statement becomes \nfinal. DesertLink shall release all remaining Security within thirty (30) Calendar Days after final \nsatisfaction of all secured obligations, subject to any specifically identified unresolved dispute. \n7. Required Security Amount Not a Limitation \nThe Required Security Amount is based on then-current estimates and calculations and does not \nlimit Eligible Customer’s total liability or responsibility for its obligations under this Agreement."},{"page":352,"startToken":131889,"endToken":132213,"text":"Schedule 3, Exhibit A \nForm of Retail Security Certification \nRetail Security Certification \nTo: DesertLink, LLC \nRe: Large Load Cost Recovery Agreement dated [●] between DesertLink, LLC and [Eligible \nCustomer] (the “Agreement”) \nThe undersigned, an authorized officer of [Eligible Customer], certifies on behalf of Eligible \nCustomer, as of the date of this certification, as follows: \n1. The retail Large Load Customer is [name], and the Large Load Facility is [identify facility]. \n2. The retail security arrangement is [identify agreement, security type, provider or issuer, \ninstrument number if applicable, and effective and expiration dates]. \n3. The amount of retail security currently available to Eligible Customer and available for the \nwholesale obligations under the Agreement is $[●]. \n4. Eligible Customer has enforceable draw or application rights, or the benefit of a binding \nundertaking, that permit it to use the retail-security proceeds to satisfy the corresponding \nwholesale obligations under the Agreement. \n5. The certified amount has not been counted for another inconsistent obligation and has not \nbeen reduced, drawn, expired, cancelled, or otherwise impaired except as disclosed here: [●]. \n6. The retail security arrangement has the following renewal, expiration, and notice terms: [●]. \nEligible Customer will deliver an updated Retail Security Certification to DesertLink within \nthree (3) Business Days after any reduction, draw, expiration, nonrenewal, termination, \namendment, loss of enforceable draw or application rights, or other event that could impair \nthe certified support. \n7. The statements in this certification are true and complete in all material respects as of the \ndate of this certification. Eligible Customer understands that DesertLink is entitled to rely on \nthis continuing certification without reviewing the underlying retail-security documents in \nthe ordinary course, subject to DesertLink’s rights under Article 7 and Schedule 3. No annual \nrenewal or recertification is required unless an updated Retail Security Certification is \nrequired under Item 6. \nThis Retail Security Certification is continuing and shall remain effective unless and until \nsuperseded, withdrawn, or deemed ineffective under the Agreement. \nELIGIBLE CUSTOMER \nBy: ________________________________ \nName: ______________________________ \nTitle: _______________________________ \nDate: _______________________________"},{"page":353,"startToken":132213,"endToken":132437,"text":"Schedule 4 - 1 \n \nSchedule 4 \nCAISO Regional Project Allocation and Responsibility \nThis Schedule shall identify each CAISO-Assigned Regional Project associated with the Large \nLoad Facility. If no CAISO-Assigned Regional Project has been identified as of the Effective \nDate, this Schedule shall state “None identified as of [date]” and shall be updated promptly after \nCAISO formally assigns a specific project share to the Large Load Facility. The assigned share, \nownership, expected and actual Regional Project In-Service Date, any Commission-authorized \nabandoned-plant incentive and its applicable order, any pre-service payment or security required \nby the CAISO Tariff or another Commission-accepted arrangement, billing path, applicable \noperational security, and credits or true-ups shall be documented below. The Schedule shall not \nbe read to impose pre-service Construction Security under this Agreement unless separately \nrequired by the applicable tariff or Commission-accepted arrangement. \nRequired project information \nProject-specific entry \nCAISO project name and identification number \n[to be completed] \nProject owner and other responsible entities \n[to be completed] \nCAISO Tariff provision, order, study, or formal \ndetermination establishing the specific assignment \n[to be completed] \nDate the assignment is made and its effective date \n[to be completed] \nLarge Load Facility to which the specific share is \nassigned \n[to be completed] \nAssigned share: percentage, dollar amount, or \nother CAISO-approved measure \n[to be completed] \nAllocation basis and calculation, including any \nshare assigned to other beneficiaries \n[to be completed]"},{"page":354,"startToken":132437,"endToken":132585,"text":"Schedule 4 - 2 \n \nRequired project information \nProject-specific entry \nProject ownership and whether costs are included \nin DesertLink’s Formula Rate \n[to be completed] \nExpected and actual project in-service date \n[to be completed] \nEstimated Annual MTRC and, once established, \nFinal Annual MTRC for the project share (the Regional \nProject Allocated ARR), together with the projected Total \nRequired Revenue Commitment, if DesertLink-owned \nand included in its Formula Rate \n[to be completed] \nBilling entity, payment method, applicable tariff \nor project-owner arrangement, and invoicing schedule \n[to be completed] \nConstruction and operational security required, \nsecurity provider, amount, effective date, and deadline \n[to be completed] \nTreatment of TAC revenues, direct payments, \ncredits, refunds, and true-ups to prevent duplicate \nrecovery \n[to be completed] \nDeadline for Eligible Customer to provide \nexecuted arrangement or compliance evidence \n[to be completed] \nMethod and timing for any prospective \nassignment change authorized by the CAISO Tariff or \nCommission-accepted methodology \n[to be completed]"},{"page":355,"startToken":132585,"endToken":132729,"text":"Schedule 4 - 3 \n \nRequired project information \nProject-specific entry \nCommission order and status authorizing \nabandoned-plant incentive for the project, including \napplicable project scope and recovery terms \n[to be completed] \nPre-service cancellation or abandonment cost \ntreatment under the CAISO Tariff, Commission order, or \napproved project arrangement; any customer contribution \nor security required and applicable credits \n[to be completed] \nFor a CAISO-Assigned Regional Project owned by another entity, this Schedule records the \nEligible Customer’s separate obligation under the CAISO Tariff or project-owner arrangement. \nThat obligation is not included in any Annual MTRC, Regional Project Allocated ARR, Total \nRequired Revenue Commitment, Cumulative Revenue Responsibility, or TRBAA Credit unless \nthe costs are included in DesertLink’s Formula Rate and the specific share is expressly identified \nas DesertLink’s responsibility. Any applicable CAISO Tariff credit or project-owner credit shall \nbe applied to prevent recovery of the same assigned share more than once."},{"page":356,"startToken":132729,"endToken":133101,"text":"Schedule 5 - 1 \n \nSchedule 5 \nMTRC Calculation Template and Cumulative Revenue Ledger \nThis Schedule contains the project-specific calculation of each Estimated Annual MTRC and \nFinal Annual MTRC and the Cumulative Revenue Ledger. DesertLink shall calculate each \nAnnual MTRC solely under this Schedule. The Final Annual MTRC shall equal the applicable \nfinal incurred capital cost multiplied by the Project-Specific Levelized Fixed Charge Rate \ncalculated in this Schedule. The calculation shall identify the applicable capital-cost input, \npresent-worth tax-depreciation benefits, Formula Rate inputs, fixed expense allocator, applicable \nallocation percentage, Annual MTRC, Total Required Revenue Commitment, Remaining \nCumulative Revenue Responsibility, and supporting inputs.  \nFor purposes of calculating present-worth federal and state income-tax depreciation benefits, the \nSchedule applies a levelized-depreciation rate of five percent (5%) of the applicable capital cost \ninput in each year of the twenty (20)-year MTRC Term. This levelized-depreciation schedule is \nnot a separate annual charge. The Schedule is fixed on the Final MTRC Determination Date \nexcept to correct an error or fraud, to implement an effective prospective reassignment, to \nimplement a final FERC order applicable to the calculation, to implement a Dispute \nDetermination under Section 11.5, or to reflect, prospectively, a change in (i) DesertLink’s return \non equity component of its Formula Rate, resulting from a final FERC order accepting or \napproving such change, or (ii) applicable federal or state tax rates or tax law enacted after the \nFinal MTRC Determination Date; provided that, the five percent (5%) annual levelized-\ndepreciation schedule shall remain fixed for the MTRC Term unless a final FERC order requires \notherwise. \nThe following project-specific calculation and ledger shall be completed for each Covered \nUpgrade. DesertLink shall include an updated ledger statement in each Reconciliation Statement \nserved on Eligible Customer under Sections 6.6 and 6.7; this Schedule does not impose a \nseparate FERC filing requirement. \nAnnual Ledger Service. DesertLink shall update the Cumulative Revenue Ledger at least \nannually in connection with its Annual Update and shall include the resulting statement and the \nsupporting workpapers in each Reconciliation Statement served on Eligible Customer. The \nstatement is an agreement-administration record and is not required to be filed with FERC unless \nFERC otherwise requires. Any dispute concerning the statement shall be resolved under Article \n11 of the Agreement."},{"page":357,"startToken":133101,"endToken":133107,"text":"Schedule 5 - 2 \n \nInputs and Security"},{"page":358,"startToken":133107,"endToken":133116,"text":"Schedule 5 - 3 \n \nQualifying Revenue and Cumulative Revenue Ledger"},{"page":359,"startToken":133116,"endToken":133124,"text":"Schedule 5 - 4 \n \nPresent Worth and Annualization Calculation"},{"page":360,"startToken":133124,"endToken":133132,"text":"Schedule 5 - 5 \n \nExpense and Capital Structure Inputs"},{"page":361,"startToken":133132,"endToken":133138,"text":"Schedule 5 - 6 \n \nTwenty-Year Depreciation Schedule"},{"page":362,"startToken":133138,"endToken":133141,"text":"Schedule 5 - 7"},{"page":363,"startToken":133141,"endToken":133148,"text":"i \n \n \n \nAppendix VI  LARGE LOAD INTERCONNECTION PROCEDURES"},{"page":364,"startToken":133148,"endToken":133447,"text":"ii \n \nTABLE OF CONTENTS  \n \n Page No. \nSection 1.  Objectives and Applicability .................................................................1 \n \n1.1 Objectives……………………………………………………………….1 \n \n \n1.2 Applicability……………………………………………………………. 1 \n \nSection 2. \nDefinitions ...............................................................................................1 \n \n \nSection 3. \nGeneral Provisions Applicable to All Interconnection Requests.....6  \n \n \n \n3.1 Interconnection Requests ......................................................................6 \n \n3.2 Transmission Interconnection Service .................................................6 \n \n3.2.1 \nThe Product .............................................................................6 \n \n3.2.2 \nNo Applicability to Transmission Service.............................7 \n \n \n3.2.3 \nRoles and Responsibilities ......................................................7 \n \n3.3 Comparability ........................................................................................7 \n \n3.4 Base Case Data .......................................................................................8 \n \n3.5 Coordination with Affected Systems ....................................................8 \n \n3.6  Capacity of the Large Load ..................................................................8 \n \n \n3.7  Proposed Service Commencement Date ..............................................9 \n \n \n3.7.1 \nInterconnection Request .........................................................9 \n \n \n3.7.2 \nAfter Start of the Large Load Interconnection Study .........9 \n3.8 Queue Position ...........................................................................................10 \n3.9 Withdrawal .............................................................................................10 \n \n3.10 Withdrawal Penalty ................................................................................11 \n        3.10.1  Calculation of the Withdrawal Penalty.....................................11 \n3.11 Standards for Co-located Inverter Based Generating Facilities ........12 \n \n \nSection 4. Large Load Study Process ........................................................................12 \n \n4.1 Timing for Submitting Interconnection Requests ..............................12 \n \n \n4.2 Processing of Interconnection Request ................................................12 \n \n4.2.1 \nInitiating an Interconnection Request ..................................13 \n \n4.2.1.1 Use of Interconnection Study Deposit ................................13 \n \n \n \n4.3 Validation of Interconnection Request ................................................14 \n \n4.3.1 \nAcknowledgment of Interconnection Request......................14 \n \n4.3.2 \nDeficiencies in Interconnection Request ...............................14 \n \n4.4   Potential Deferral of the Interconnection Studies ................................15 \n4.5 Scoping Meeting .....................................................................................15 \n \n4.6 Interconnection Studies .........................................................................16 \n \n4.6.1 \nLarge Load Interconnection Study .......................................17 \n \n4.6.1.1  Scope of the Large Load Interconnection Study .................17 \n \n4.6.1.2  Timing of the Large Load Interconnection Study Results .18 \n \n4.6.1.3   Large Load Interconnection Study Report Meeting .........19 \n \n4.6.1.4 Increase in the Commercial Readiness Deposit ...................19 \n4.6.1.5  Restudy....................................................................................20 \n4.6.1.6  Modifications ..........................................................................20"},{"page":365,"startToken":133447,"endToken":133660,"text":"iii \n \n4.6.2     Optional Flexible Interim Load Interconnection (FILI) Study and \nAgreement ...............................................................................................21 \n4.6.3     Additional Studies .....................................................................23 \n \n4.6.4     Financing of Participating TO’s Interconnection Facilities and Large \nLoad Network Upgrades .......................................................................24 \n4.7 Interconnection Financial Security ......................................................24 \n \n4.7.1 \nTypes of Interconnection Financial Security ........................24 \n \n \n \nSection 5. \nLarge Load Interconnection Agreement .............................................25 \n \n5.1 Tender.....................................................................................................25 \n5.2   Negotiation ...............................................................................................25 \n \n5.3 Execution and Filing ..............................................................................26 \n5.4   Commencement of Interconnection Activities .....................................27 \n \n \nSection 6. \nConstruction of Participating TO’s Interconnection Facilities \n \n and Large Load Network Upgrades ....................................................27 \n \n6.1 Schedule..................................................................................................27 \n6.2 Construction Sequencing.......................................................................27 \n \n6.2.1 \nGeneral .....................................................................................27 \n \n6.2.2 \nAdvancing Construction of  \nLarge Load Network Upgrades that are Part of an Expansion Plan of the \nParticipating TO ....................................................................................27 \n \n6.3 Special Provisions for Affected Systems ..............................................28 \n \n \nSection 7. \nMiscellaneous..........................................................................................28 \n \n7.1 Confidentiality ........................................................................................28 \n \n7.1.1 \nScope.........................................................................................28 \n \n7.1.2 \nRelease of Confidential Information .....................................29 \n \n7.1.3 \nRights .......................................................................................29 \n \n7.1.4 \nNo Warranties .........................................................................29 \n \n7.1.5 \nStandard of Care .....................................................................30 \n \n7.1.6 \nOrder of Disclosure .................................................................30 \n \n7.1.7 \nRemedies ..................................................................................30 \n \n7.1.8 \nDisclosure to FERC, its Staff, or a State ...............................30 \n \n7.2 Disputes ................................................................................................31 \n7.2.1 \nSubmission ...............................................................................31 \n \n \nAttachment 1 – Interconnection Request Form"},{"page":366,"startToken":133660,"endToken":134060,"text":"1 \n \n \n \n LARGE LOAD INTERCONNECTION PROCEDURES (LLIP) \n \n \nSection 1. \nObjectives and Applicability  \n1.1 Objectives \n \nThe objective of this LLIP is to implement requirements for Large Load interconnections to the \nParticipating TO’s Transmission System pursuant to the TO Tariff.  For purposes of this LLIP, \nthe “Participating TO” is DesertLink, LLC (“DesertLink”), and the “TO Tariff” is the \nDesertLink, LLC Transmission Owner Tariff.  Because DesertLink is a Non-Load-Serving \nParticipating TO and has no End-Use Customers, a Large Load interconnecting under this LLIP \nwill not be a retail transmission customer of the Participating TO.   \n \n1.2 Applicability  \n \nThe LLIP is applicable to a Large Load Interconnection Customer that is either (1) proposing to \ninterconnect a Large Load to the Participating TO’s Transmission System; (2) seeking to \nincrease the capacity of an existing Large Load processed under the LLIP; or (3) with respect to \nan existing load interconnected to the Participating TO’s Transmission System that was not \nprocessed under the LLIP, seeking an increase of 50 MW or greater.  This LLIP only applies to \ncompleted Interconnection Requests submitted after the effective date of this Appendix VI to the \nTO Tariff.  Consistent with Section 10A of the TO Tariff, all requests for ECLL Interconnection \nshall be directed to the Participating TO.  An Interconnection Request submitted under this LLIP \nshall constitute the ECLL Interconnection Application, and the Interconnection Studies and the \nLarge Load Interconnection Agreement under this LLIP shall constitute the study process and \nthe ECLL Interconnection Agreement, respectively, for purposes of Section 10A of the TO \nTariff.  \n \n \nSection 2. \nDefinitions  \n \nTerms used in this LLIP with initial capitalization shall have the meanings set forth below.  The \nsingular of any definition shall include the plural and the plural shall include the singular.  If a \nterm with initial capitalization used herein is not defined, such term shall have the meanings \nascribed to such term in Section 3 of the TO Tariff.   \n \n \nAffected System shall mean an electric system other than the Participating TO’s \nTransmission System that may be affected by the proposed interconnection.   \n \n \nAffected System Operator shall mean the entity that owns or operates an Affected System, \nand includes an Affected System Owner as defined in any Cost Recovery Agreement.   \n \n \n \n \nApplicable Laws and Regulations shall mean all duly promulgated applicable federal, state \nand local laws, regulations, rules, ordinances, codes, decrees, judgments, directives, or judicial or \nadministrative orders, permits and other duly authorized actions of any Governmental Authority."},{"page":367,"startToken":134060,"endToken":134499,"text":"2 \n \nBase Case shall mean data including, but not limited to, base power flow, short circuit and \nstability data bases, underlying load, generation, and transmission facility assumptions, \ncontingency lists, including relevant remedial action schemes, and transmission diagrams used to \nperform the Interconnection Studies.  The Base Case may include Critical Energy Infrastructure \nInformation (as that term is defined by FERC).  The Base Case may include transmission \nfacilities as approved by the Participating TO or ISO, as applicable, Reliability Network \nUpgrades that are included in a signed interconnection agreement, Large Load Network \nUpgrades, Large Loads and any co-located generation, and load forecast. The Base Case may \nalso include generation facilities that (i) are directly interconnected to a Distribution System or \nthe ISO Controlled Grid; (ii) are interconnected to Affected Systems and may have an impact on \nthe Interconnection Request; (iii) have a pending request to interconnect to a Distribution System \nor an Affected System; or (iv) are not interconnected to a Distribution System or the ISO \nControlled Grid, but are subject to the terms and conditions of a fully executed interconnection \nagreement (or its equivalent predecessor agreement) or for which an unexecuted interconnection \nagreement (or its equivalent predecessor agreement) has been requested to be filed with FERC.   \n \n \nBusiness Day shall mean Monday through Friday, excluding Federal Holidays. \n \n \nCalendar Day shall mean any day including Saturday, Sunday or a Federal Holiday.   \n \nCommercial Readiness Deposit shall mean a deposit paid as set forth in LLIP Sections \n4.2.1 and 4.6.1.4. \n \n \nConfidential Information shall mean any confidential, proprietary or trade secret \ninformation of a plan, specification, pattern, procedure, design, device, list, concept, policy or \ncompilation relating to the present or planned business of a Party, which is designated as \nconfidential by the Party supplying the information, whether conveyed orally, electronically, in \nwriting, through inspection, or otherwise. \n \n \nCost Recovery Agreement shall have the meaning set forth in Section 3 of the TO Tariff. \n \n \nDispute Resolution shall mean the applicable procedure for resolution of a dispute between \nthe Parties as described in Section 14 of the TO Tariff, including, as applicable, the ISO ADR \nProcedures.  \n \n \nFlexible Interim Load Interconnection (FILI) Service shall have the meaning set forth in \nSection 3 of the TO Tariff. \n \n \nFILI Study shall mean the study performed by the Participating TO pursuant to LLIP \nSection 4.6.2 to determine the availability of Interim Firm Interconnection Service and FILI \nService. \n \n \nInterconnection Financial Security shall mean any of the financial instruments listed in \nLLIP Section 4.7.1 provided by the Large Load Interconnection Customer to comply with its \nobligations under the LLIP or the Large Load Interconnection Agreement."},{"page":368,"startToken":134499,"endToken":134949,"text":"3 \n \n \nInterconnection Request shall mean a request, in the form of Attachment 1 to Appendix VI \nto the TO Tariff, to interconnect a new Large Load, or to increase the capacity of, or make a \nMaterial Modification to the operating characteristics of, an existing Large Load that is \ninterconnected with the Participating TO’s Transmission System. \n \n \nInterconnection Study shall mean any of the following studies: the Large Load \nInterconnection Study, the FILI Study, restudies, and any additional studies performed pursuant \nto LLIP Section 4.6.3. \n \n \nInterconnection Study Deposit shall mean the cash deposit provided to the Participating \nTO under LLIP Section 4.2.1 as a requirement of a valid Interconnection Request to be used to \noffset the cost of the Interconnection Studies. \n \nLarge Load Capacity shall mean the maximum capacity of the Large Load at the Point of \nInterconnection.  \n \nLarge Load Customer shall mean the End-User that owns, operates, or proposes to develop \nthe Large Load and receives, or will receive, retail transmission service from the Large Load \nInterconnection Customer, and shall be the Large Load Customer for purposes of the TO Tariff \nand any Cost Recovery Agreement. \n \nLarge Load Interconnection Agreement shall mean the interconnection agreement \nbetween the Participating TO and the Large Load Interconnection Customer, developed by the \nParticipating TO consistent with the TO Tariff and the results of the Interconnection Studies and \nnegotiated between the Parties pursuant to LLIP Section 5, which sets forth the terms and \nconditions governing the interconnection of the Large Load to the Participating TO’s \nTransmission System, including, without limitation, cost responsibility, payment provisions, cost \nrecovery, and financial security for the Participating TO’s Interconnection Facilities and Large \nLoad Network Upgrades, as it may be amended from time to time. The Large Load \nInterconnection Agreement shall constitute the ECLL Interconnection Agreement for purposes of \nthe TO Tariff, as applicable, and shall be filed with FERC by the Participating TO to the extent \nrequired. For purposes of the TO Tariff, the Participating TO’s Interconnection Facilities and \nLarge Load Network Upgrades identified in the Large Load Interconnection Agreement shall \ntogether constitute the ECLL Interconnection Facilities. \n \nLarge Load Interconnection Customer shall mean an Eligible Customer for Large Load \n(“ECLL”), as defined in Section 3 of the TO Tariff, that proposes to interconnect its facilities \nwith the Participating TO’s Transmission System for the purpose of providing retail transmission \nservice to a Large Load. \n \nLarge Load Interconnection Customer Interconnection Facilities shall mean all facilities \nand equipment owned, controlled, or operated by the Large Load Interconnection Customer or \nthe Large Load Customer up to the Point of Change of Ownership as identified in the Large \nLoad Interconnection Agreement, including any modifications, additions or upgrades to such \nfacilities and equipment."},{"page":369,"startToken":134949,"endToken":135428,"text":"4 \n \n \n \nLarge Load Interconnection Procedures (LLIP) shall mean the interconnection \nprocedures applicable to an Interconnection Request set forth in this Appendix VI to the TO \nTariff. \n \nLarge Load Interconnection Study shall mean an engineering study conducted by the \nParticipating TO for a Large Load Interconnection Customer under the LLIP that evaluates the \nimpact of the proposed interconnection on the safety and reliability of Participating TO’s \nTransmission System and, if applicable, an Affected System. The Large Load Interconnection \nStudy will also determine a list of facilities (including Participating TO’s Interconnection \nFacilities and Large Load Network Upgrades), the cost of those facilities, and the time required \nto interconnect the Large Load with the Participating TO’s Transmission System. The scope of \nthe study is defined in LLIP Section 4.6.1.1. \n \nLarge Load Network Upgrades shall mean the additions, modifications, and upgrades to \nthe ISO Controlled Grid at or beyond the Point of Interconnection necessary to serve one or more \nLarge Loads safely and reliably that are identified through the Large Load Interconnection Study \nand submitted to the ISO for concurrence pursuant to Section 25.7 of the ISO Tariff. Large Load \nNetwork Upgrades do not include Participating TO’s Interconnection Facilities. To the extent a \nLarge Load Network Upgrade is owned or to be constructed by the Participating TO and is \nidentified in Schedule 1 to a Cost Recovery Agreement, such Large Load Network Upgrades \nshall constitute Large Load-Driven Upgrades, as defined in that Cost Recovery Agreement.  \n \nLarge Load Study Process Agreement shall mean the agreement, developed and tendered \nby the Participating TO pursuant to LLIP Section 4.5, entered into by the Large Load \nInterconnection Customer and the Participating TO which sets forth the Parties’ agreement to \nperform Interconnection Studies under the LLIP. \n \n \nMaterial Modification shall mean those modifications that have a material impact on the \ncost or timing of any Interconnection Request, or any other valid interconnection request to the \nParticipating TO or the ISO, with an equal or later Queue Position date.  \n \n \n \nParticipating TO’s Interconnection Facilities shall mean all facilities and equipment \nowned, controlled, or operated by the Participating TO from the Point of Change of Ownership \nto the Point of Interconnection as identified in the Large Load Interconnection Agreement, \nincluding any modifications, additions or upgrades to such facilities and equipment.  \nParticipating TO’s Interconnection Facilities are transmission facilities but are not controlled by \nthe ISO.  Participating TO’s Interconnection Facilities are sole use facilities and shall not include \nLarge Load Network Upgrades.  \n \nParticipating TO’s Transmission System shall mean the facilities owned and operated by \nthe Participating TO and that have been placed under the ISO’s Operational Control, which \nfacilities form part of the ISO Controlled Grid. \n \nPoint of Change of Ownership shall mean the point, as set forth in the Large Load \nInterconnection Agreement, where the Large Load Interconnection Customer's interconnection \nfacilities connect to the Participating TO’s Interconnection Facilities."},{"page":370,"startToken":135428,"endToken":135885,"text":"5 \n \n \n \nPoint of Interconnection shall mean the point, as set forth in the Large Load \nInterconnection Agreement, where the Participating TO’s Interconnection Facilities connect to \nthe Participating TO’s Transmission System.  For purposes of the TO Tariff, the Point of \nInterconnection shall be the Point of Withdrawal for the Large Load. \n \n  \nQueue Position shall mean the order of a valid Interconnection Request, relative to all other \npending valid Interconnection Requests, established pursuant to LLIP Section 3.8. \n \n \nReasonable Efforts shall mean, with respect to an action required to be attempted or taken \nby a Party under the LLIP or the Large Load Interconnection Agreement, efforts that are timely \nand consistent with Good Utility Practice and are otherwise substantially equivalent to those a \nParty would use to protect its own interests. \n \nReport Meeting shall mean the meeting among the Participating TO, the Large Load \nInterconnection Customer, and if applicable, the ISO and other Affected System Operators to \ndiscuss the results of the Interconnection Studies as set forth in the LLIP.  \n \nScoping Meeting shall mean the meeting between representatives of the Large Load \nInterconnection Customer and Participating TO, and if applicable, the ISO, conducted for the \npurpose of discussing alternative interconnection options, to exchange information including any \ntransmission data and earlier study evaluations that would be reasonably expected to impact such \ninterconnection options, to analyze such information, and to determine the potential feasible \nPoints of Interconnection.  \n \nService Commencement Date shall mean the date the Large Load is initially operated in \nparallel with the Participating TO’s Transmission System and transmission interconnection \nservice is provided to the Large Load Interconnection Customer pursuant to the terms of an \nexecuted Large Load Interconnection Agreement. For purposes of any Cost Recovery \nAgreement, the Service Commencement Date shall be the Large Load Service Commencement \nDate specified in Schedule 1 to that agreement.  \n \nSite Control shall have the meaning set forth in Section 3 of the TO Tariff. \n \nSystem Protection Facilities shall mean the equipment, including necessary protection \nsignal communications equipment, that protects (1) the Participating TO’s Transmission System, \nParticipating TO’s Interconnection Facilities, ISO Controlled Grid, and Affected Systems from \nfaults or other electrical disturbances occurring at the Large Load and (2) the Large Load from \nfaults or other electrical system disturbances occurring on the ISO Controlled Grid, Participating \nTO’s Interconnection Facilities, and Affected Systems or on other delivery systems or other \ngenerating systems to which the ISO Controlled Grid is directly connected. \n \nTransmission Interconnection Service shall mean the service provided by the Participating \nTO associated with interconnecting the Large Load to the Participating TO’s Transmission \nSystem and enabling the Large Load Interconnection Customer to receive electric energy at the \nPoint of Interconnection, pursuant to the terms of the Large Load Interconnection Agreement and \nthe TO Tariff."},{"page":371,"startToken":135885,"endToken":136306,"text":"6 \n \n \nWithdrawal Penalty shall mean the penalty assessed by Participating TO to a Large Load \nInterconnection Customer that chooses to withdraw or is deemed withdrawn from Participating \nTO’s interconnection queue or whose Large Load does not otherwise reach its Service \nCommencement Date. The calculation of the Withdrawal Penalty is set forth in LLIP Section \n3.10.1. \n \nSection 3. \nGeneral Provisions Applicable to All Interconnection Requests \n \n \n3.1 \nInterconnection Requests \nA Large Load Interconnection Customer shall submit to Participating TO an \nInterconnection Request in the form of Attachment 1 to this LLIP for processing \nunder the LLIP.  Consistent with Section 10A.2.1 of the TO Tariff, the Large \nLoad Interconnection Customer shall send a copy of the Interconnection Request \nto the ISO, and the Interconnection Request and all supporting documentation \nshall be submitted electronically to the Participating TO in the manner posted on \nthe Participating TO’s public website.   \n \nAn Interconnection Request for the expansion of capacity of an existing Large \nLoad shall be treated the same as an Interconnection Request for a new Large \nLoad pursuant to this LLIP.  \n \nCo-located generation serving a Large Load that will not export to the ISO \nControlled Grid shall be interconnected in accordance with the generator \ninterconnection rules of the applicable ECLL, as approved by its Local \nRegulatory Authority (including, for a UDC subject to the jurisdiction of the \nCPUC, CPUC Electric Rule 21), consistent with Section 10A.5 of the TO Tariff; \nprovided that, where such co-located generation is included in the Interconnection \nRequest, the Participating TO will evaluate its incremental impacts on the \nParticipating TO’s Transmission System as part of the LLIP study process. Co-\nlocated generation that will export to the ISO Controlled Grid is required to \nsubmit a generator interconnection request to the ISO in accordance with Section \n25.7.6 of the ISO Tariff for evaluation of the proposed generator interconnection \nand the Large Load will be evaluated pursuant to the LLIP.  For a Large Load co-\nlocated with an exporting generating facility, the ISO will be a party to a pro \nforma agreement that bridges the generator’s Large Generator Interconnection \nAgreement with the Large Load Interconnection Agreement, or will negotiate a \nnon-conforming Large Generator Interconnection Agreement, consistent with \nSection 10A.5 of the TO Tariff. \n \n3.2 \nTransmission Interconnection Service \n \n3.2.1 The Product.  Transmission Interconnection Service allows Large Load \nInterconnection Customer to connect the Large Load to the Participating \nTO’s Transmission System and be eligible to receive electric energy and \ncapacity from the ISO Controlled Grid."},{"page":372,"startToken":136306,"endToken":136666,"text":"7 \n \n3.2.2 No Applicability to Transmission Service.  Nothing in this LLIP shall \nconstitute a request for transmission service or confer upon a Large Load \nInterconnection Customer any right to receive transmission service.   \n \n3.2.3 Roles and Responsibilities. \n \n3.2.3.1 Each Interconnection Request will be subject to the direction and \noversight of the Participating TO.  The Participating TO will \nconduct or cause to be performed the required Interconnection \nStudies and any additional studies the Participating TO determines \nto be reasonably necessary.  The analysis of impacts on, and \nupgrades required to, the Participating TO’s Transmission System \nwill be performed by the Participating TO and will be subject to \nreview and concurrence by the ISO.  The Participating TO will \nperform all required studies related to the Participating TO’s \nTransmission System and will coordinate with Affected System \nOperators in accordance with LLIP Section 3.5. \n \n3.2.3.2 The Participating TO will complete or cause to be completed all \nstudies as required within the timelines provided in this LLIP. \n \n \n3.2.3.3 Each Large Load Interconnection Customer shall pay the actual \ncosts of all Interconnection Studies, and any additional studies the \nParticipating TO determines to be reasonably necessary in \nresponse to the Interconnection Request.  The Participating TO \nshall reimburse the ISO for the actual cost of any portion of the \nInterconnection Studies that the ISO performs related to the ISO \nControlled Grid, as applicable.  \n \n \n3.2.3.3.1 The Participating TO shall issue invoices for \nInterconnection Studies that shall include a detailed and \nitemized accounting of the cost of each Interconnection \nStudy.  Whenever the actual cost of performing the \nInterconnection Studies exceeds the Interconnection \nStudy Deposit, the Large Load Interconnection Customer \nshall pay the undisputed difference in accordance with the \nParticipating TO issued invoice within thirty (30) \nCalendar Days.  The Participating TO shall not be \nobligated to continue to have any studies conducted \nunless the Large Load Interconnection Customer has paid \nall undisputed amounts in compliance herewith. \n \n3.3 \nComparability \nParticipating TO shall receive, process and analyze all Interconnection Requests \nin a timely manner as set forth in this LLIP.  Participating TO will use the same"},{"page":373,"startToken":136666,"endToken":137104,"text":"8 \n \nReasonable Efforts in processing and analyzing Interconnection Requests from all \nLarge Load Interconnection Customers, whether the Large Load is owned by \nParticipating TO and its Affiliates or by a third party.   \n \n3.4 \nBase Case Data \nParticipating TO shall provide Base Case data to a Large Load Interconnection \nCustomer upon request subject to confidentiality provisions in LLIP Section 7.1. \nParticipating TO shall provide base power flow, short circuit databases, including \nall underlying assumptions, and contingency list used in the Large Load \nInterconnection Customer’s Interconnection Studies.  Participating TO is \npermitted to require that the Large Load Interconnection Customer sign a \nconfidentiality agreement before the release of commercially sensitive \ninformation or Critical Energy Infrastructure Information in the Base Case data.  \nSuch Base Cases may include all (i) Large Loads, (ii) generation projects, and (iii) \ntransmission projects, including merchant transmission projects that are proposed \nfor the Participating TO’s Transmission System for which a transmission \nexpansion plan has been submitted and approved by the applicable authority. \n \n \n3.5 \nCoordination with Affected Systems \nThe Participating TO will notify the Affected System Operators that are \npotentially affected by a Large Load Interconnection Customer’s Interconnection \nRequest.  The Participating TO will coordinate the conduct of any studies \nrequired to determine the impact of the Interconnection Request on Affected \nSystems with Affected System Operators and, if possible, include those results (if \navailable) in its applicable Interconnection Study within the time frame specified \nin this LLIP.  Participating TO will include such Affected System Operators in all \nmeetings held with Large Load Interconnection Customer as required by this \nLLIP.  Large Load Interconnection Customer will cooperate with Participating \nTO in all matters related to the conduct of studies and the determination of \nmodifications to Affected Systems.  If an Affected System Operator, that has been \ninformed its system is an Affected System refuses to cooperate with the \nParticipating TO with whom interconnection has been requested in all matters \nrelated to the conduct of studies and the determination of whether modifications \nto its Affected System are necessary to avoid adverse impacts, it waives any right \nin any fora that the Participating TO’s provision of service has adversely impacted \nsuch Affected System Operator. \n \n3.6 \nCapacity of the Large Load  \n \nThe Interconnection Request shall be evaluated using the maximum capacity \nrequested by the Large Load Interconnection Customer.  However, if the \nmaximum capacity that the Large Load is capable of receiving is greater than the \nmaximum capacity requested by the Large Load Interconnection Customer, the \nLarge Load Interconnection Customer will be required to limit the Large Load \ncapacity to no greater than the amount requested (e.g., through use of a control"},{"page":374,"startToken":137104,"endToken":137540,"text":"9 \n \nsystem, power relay(s), or other similar device settings or adjustments), and the \nLarge Load Interconnection Customer must obtain the Participating TO’s \nagreement, with such agreement not to be unreasonably withheld, that the manner \nin which the Large Load Interconnection Customer proposes to implement such a \nlimit will not adversely affect the safety and reliability of the Participating TO’s \nTransmission System.  If the Participating TO does not so agree, then the \nInterconnection Request must be withdrawn or revised to specify the maximum \ncapacity that the Large Load is capable of receiving.    Furthermore, nothing in \nthis section shall prevent a Participating TO from considering a capacity higher \nthan the limited capacity, if appropriate, when evaluating system protection \nimpacts. \n \n3.7 \nProposed Service Commencement Date \nThe  proposed Service Commencement Date of the new Large Load or increase in \ncapacity of the existing Large Load shall not exceed seven years from the date the \nInterconnection Request is received by Participating TO for those Interconnection \nRequests studied in accordance with the Large Load Interconnection Procedures, \nunless Large Load Interconnection Customer demonstrates and the Participating \nTO agrees, such agreement not to be unreasonably withheld, that engineering, \npermitting and construction of the new Large Load or increase in capacity of the \nexisting Large Load will take longer than the seven-year period.    \n \n3.7.1 Interconnection Request.  If the proposed Service Commencement Date in \nthe Interconnection Request is more than seven years from the date the \nInterconnection Request is received by the Participating TO, the Large Load \nInterconnection Customer must demonstrate, subject to the Participating TO’s \nagreement, such agreement not to be unreasonably withheld, that the required \nengineering, permitting and construction of the Large Load will take longer than \nthe seven-year period.  \n \n3.7.2 After Start of the Large Load Interconnection Study.  Any request to \nextend the Service Commencement Date after commencement of the Large Load \nInterconnection Study under the LLIP, or following execution of a Large Load \nInterconnection Agreement, shall be subject to the following: \n \n(i) Requested extension does not exceed seven years from Service \nCommencement Date in the original Interconnection Request.  A request \nto extend the Service Commencement Date that does not exceed seven \nyears from the Service Commencement Date in the original \nInterconnection Request is subject to the modification assessment process \nspecified in LLIP Section 4.6.1.6.1.  \n \n(ii) Requested extension exceeds seven years from Service Commencement \nDate in the original Interconnection Request.  A request to extend the \nService Commencement Date that exceeds seven years from the Service \nCommencement Date in the original Interconnection Request shall (a) \ndemonstrate, subject to the Participating TO’s agreement, such agreement"},{"page":375,"startToken":137540,"endToken":137955,"text":"10 \n \nnot to be unreasonably withheld, that engineering, permitting and \nconstruction of the new Large Load or increase in capacity of the existing \nLarge Load will take longer than the seven-year period, and (b) be subject \nto the modification assessment process specified in LLIP Section \n4.6.1.6.1. \n \nAny extension of the Service Commencement Date under this LLIP Section 3.7.2 \nshall not extend the Outside Date under any applicable Cost Recovery Agreement \nunless the parties to that agreement agree in writing to such extension. \n \n3.8   Queue Position \n \n           3.8.1 Assignment of Queue Position. \nParticipating TO shall assign a Queue Position as follows: the Queue \nPosition shall be assigned based upon the date and time of receipt of all \nitems required pursuant to the provisions of LLIP Section 4.2.1.   \n \n3.8.2 Higher Queue Position.  \nA higher Queue Position assigned to an Interconnection Request is one \nthat has been placed “earlier” in the queue in relation to another \nInterconnection Request that is assigned a lower Queue Position.  \n \n \n3.9 \nWithdrawal \nLarge Load Interconnection Customer may withdraw its Interconnection Request \nat any time by written notice of such withdrawal to Participating TO, and the \nParticipating TO will notify the ISO and Affected System Operators, if any, \nwithin three (3) Business Days of receipt of such a notice.  In addition, after \nconfirmation by the Participating TO of a valid Interconnection Request, if the \nLarge Load Interconnection Customer fails to adhere to all requirements of this \nLLIP, except as provided in LLIP Section 7.2 (Disputes), Participating TO shall \ndeem the Interconnection Request to be withdrawn and shall provide written \nnotice to Large Load Interconnection Customer of the deemed withdrawal within \nfive (5) Business Days and an explanation of the reasons for such deemed \nwithdrawal.  Upon receipt of such written notice, Large Load Interconnection \nCustomer shall have five (5) Business Days in which to either (i) respond with \ninformation or action that cures the deficiency, or (ii) support its position that the \ndeemed withdrawal was erroneous and notify the Participating TO of its intent to \npursue Dispute Resolution. \n \nFor an Interconnection Request under the LLIP, withdrawal shall result in the \nremoval of the Interconnection Request from the Interconnection Studies.  If a \nLarge Load Interconnection Customer disputes the withdrawal and removal from \nthe Interconnection Studies and has elected to pursue Dispute Resolution, Large \nLoad Interconnection Customer's Interconnection Request will not be considered \nin any ongoing Interconnection Study during the Dispute Resolution process."},{"page":376,"startToken":137955,"endToken":138360,"text":"11 \n \nIn the event of such withdrawal, Participating TO, subject to the provisions in \nLLIP Section 7.1, as applicable, shall provide, at Large Load Interconnection \nCustomer's request, all information that Participating TO developed for any \ncompleted study conducted up to the date of withdrawal of the Interconnection \nRequest. \n \n3.10 \nWithdrawal Penalty \n \nA Large Load Interconnection Customer with an Interconnection Request being \nprocessed under the LLIP will be subject to a Withdrawal Penalty if it withdraws \nits Interconnection Request or is deemed withdrawn, or the Large Load does not \notherwise achieve its Service Commencement Date, which date may be modified \nif the necessary Participating TO-owned facilities cannot be constructed on a \ntimeline that meets such date, unless: (1) the withdrawal does not have a material \nimpact on the cost or timing of any equal or later queued interconnection request; \n(2) Large Load Interconnection Customer withdraws after receiving Large Load \nInterconnection Customer’s most recent Interconnection Study report and the \nLarge Load Network Upgrade costs assigned to the Interconnection Request \nidentified in that report have increased by more than twenty-five percent (25%) \ncompared to costs identified in Large Load Interconnection Customer’s preceding \nInterconnection Study report; or (3) Large Load Interconnection Customer \nwithdraws after receiving an Interconnection Study report issued after completion \nof the initial Large Load Interconnection Study and the Large Load Network \nUpgrade costs assigned to the Interconnection Request identified in such \nInterconnection Study report have increased by more than one hundred percent \n(100%) compared to costs identified in the initial Large Load Interconnection \nStudy report. \n \n3.10.1 Calculation of the Withdrawal Penalty \n \nIf the Large Load Interconnection Customer withdraws its Interconnection \nRequest or is deemed withdrawn prior to the commencement of the Large \nLoad Interconnection Study, Large Load Interconnection Customer will \nnot be subject to a Withdrawal Penalty.  If Large Load Interconnection \nCustomer withdraws, is deemed withdrawn, or otherwise does not achieve \nits Service Commencement Date at any point after the commencement of \nthe Large Load Interconnection Study, that Large Load Interconnection \nCustomer’s Withdrawal Penalty will be the greater of: (1) the Large Load \nInterconnection Customer’s Interconnection Study Deposit required under \nLLIP Section 4.2.1; or (2) as follows in (a)–(c): \n \n(a) If Large Load Interconnection Customer withdraws or is deemed \nwithdrawn during the Large Load Interconnection Study or after \nreceipt of a Large Load Interconnection Study report, Large Load \nInterconnection Customer will be charged two (2) times the actual cost"},{"page":377,"startToken":138360,"endToken":138720,"text":"12 \n \nof the Large Load Interconnection Study performed for the Large Load \nInterconnection Customer. \n \n(b) If Large Load Interconnection Customer withdraws or is deemed \nwithdrawn after receipt of the draft Large Load Interconnection \nAgreement but before Large Load Interconnection Customer has \nexecuted a Large Load Interconnection Agreement or has requested \nthat its Large Load Interconnection Agreement be filed unexecuted, \nLarge Load Interconnection Customer will be charged ten percent \n(10%) of its estimated Large Load Network Upgrade costs as reflected \nin the most recently completed Interconnection Study.   \n \n(c) If Large Load Interconnection Customer has executed a Large \nLoad Interconnection Agreement or has requested that its Large Load \nInterconnection Agreement be filed unexecuted and subsequently \nwithdraws its Interconnection Request, the Large Load Interconnection \nCustomer’s Withdrawal Penalty will be calculated as set forth in the \nLarge Load Interconnection Agreement.   \n \nThe Commercial Readiness Deposit shall be retained as financial security \nfor the Withdrawal Penalty (if applicable) and, other than as set forth in \nthe Large Load Interconnection Agreement, any security not applied to the \nWithdrawal Penalty will be released to the Large Load Interconnection \nCustomer following withdrawal or the Service Commencement Date.  \nWhere a Cost Recovery Agreement applies, (i) any Commercial Readiness \nDeposit or Interconnection Financial Security provided for the same costs \nshall count toward, and shall not be duplicated by, the Construction \nSecurity required under the Cost Recovery Agreement, and (ii) any \nWithdrawal Penalty paid with respect to a Large Load Network Upgrade \nshall be credited against the Pre-In-Service Termination Costs payable \nunder the Cost Recovery Agreement for that upgrade, so that the \nParticipating TO does not recover the same costs more than once. \n \n3.11 \nStandards for Co-located Inverter Based Generating Facilities \n \nInverters used for the production, and/or later injection from storage, of electricity \nshall meet the inverter certification standards of UL-1741 and UL-1741 \nSupplement B. \n \nSection 4.  Large Load Study Process \n \n4.1 \nTiming For Submitting Interconnection Requests \nA Large Load Interconnection Customer may submit an Interconnection Request \nfor processing under the LLIP at any time during the year. The Participating TO, \nin coordination with the ISO, as applicable, will study the Interconnection \nRequest.   \n \n4.2 \nProcessing of Interconnection Request"},{"page":378,"startToken":138720,"endToken":139141,"text":"13 \n \n \n4.2.1 \nInitiating an Interconnection Request.  To initiate an \nInterconnection Request under the LLIP, Large Load Interconnection \nCustomer must submit all of the following: (i) an Interconnection Study \nDeposit of $250,000; (ii) a completed Interconnection Request in the form \nof Attachment 1 to the LLIP, including preferred Point of Interconnection \nand voltage level, all information required by Section 10A.2.1 of the TO \nTariff (other than any election of interim service, which shall be made in \naccordance with LLIP Section 4.6.2), and all other technical data; (iii) a \nCommercial Readiness Deposit equal to two times the Interconnection \nStudy Deposit described in this LLIP Section 4.2.1 in the form of an \nirrevocable letter of credit, cash, a surety bond, or other form of security \nthat is reasonably acceptable to Participating TO, in accordance with LLIP \nSection 4.7.1. This Commercial Readiness Deposit is refunded to Large \nLoad Interconnection Customer according to LLIP Section 3.10.1; \nhowever, the Participating TO shall be entitled to hold the Commercial \nReadiness Deposit until the Large Load Interconnection Customer’s Large \nLoad achieves its Service Commencement Date; and (iv) demonstration of \nSite Control.   \n \n4.2.1.1 Use of Interconnection Study Deposit.  The Interconnection \nStudy Deposit shall be applied to pay for prudent costs incurred by \nthe Participating TO, the ISO, or third parties at the direction of the \nParticipating TO or ISO, as applicable, to perform and administer \nthe Interconnection Studies.   \n \nIn the event a Large Load Interconnection Customer withdraws its \nInterconnection Request prior to the commencement of the Large \nLoad Interconnection Study, Large Load Interconnection Customer \nmust pay Participating TO the actual costs of processing its \nInterconnection Request. In the event a Large Load \nInterconnection Customer withdraws after commencement of the \nLarge Load Interconnection Study, Participating TO shall charge \nand Large Load Interconnection Customer shall pay the actual \ncosts of the Interconnection Studies.  \n \nAny difference between the Interconnection Study Deposit and the \nactual cost of the Interconnection Studies shall be paid by or \nrefunded to the Large Load Interconnection Customer. Any \ninvoices for Interconnection Studies shall include a detailed and \nitemized accounting of the cost of each Interconnection Study. \nLarge Load Interconnection Customers shall pay any such \nundisputed costs within thirty (30) Calendar Days of receipt of an \ninvoice. If Large Load Interconnection Customer fails to pay such \nundisputed costs within the time allotted, its Interconnection \nRequest shall be deemed withdrawn and will be subject to a \nWithdrawal Penalty pursuant to LLIP Section 3.10.1."},{"page":379,"startToken":139141,"endToken":139570,"text":"14 \n \n \nThe Participating TO will reimburse the ISO or third parties, as \napplicable, for all work performed on behalf of the withdrawn \nInterconnection Request at the Participating TO’s direction. The \nLarge Load Interconnection Customer must pay all monies due \nbefore it is allowed to obtain any Interconnection Study data or \nresults. \n \n \n4.3 \nValidation of Interconnection Request \n \n4.3.1 Acknowledgment of Interconnection Request.  Participating TO shall \nnotify the Large Load Interconnection Customer within ten (10) Business \nDays of receipt of the Interconnection Request, which notice shall state \nwhether the Interconnection Request is deemed valid.   \n \n4.3.2 Deficiencies in Interconnection Request.  An Interconnection Request \nwill not be considered to be a valid request until all items in LLIP Section \n4.2.1 have been received by Participating TO and deemed valid by the \nParticipating TO.  If an Interconnection Request fails to meet the \nrequirements set forth in LLIP Section 4.2.1, Participating TO shall \ninclude in its notification to the Large Load Interconnection Customer \nunder LLIP Section 4.3.1 the reasons for such failure and that the \nInterconnection Request does not constitute a valid request.  Consistent \nwith Section 10A.2.3 of the TO Tariff, the Participating TO will attempt to \nremedy deficiencies in the Interconnection Request through informal \ncommunications with the Large Load Interconnection Customer, and the \nLarge Load Interconnection Customer shall provide Participating TO the \nadditional requested information needed to constitute a valid request.  \nWhenever the additional requested information is provided by the Large \nLoad Interconnection Customer, the Participating TO shall notify the \nLarge Load Interconnection Customer within five (5) Business Days of \nreceipt of the additional requested information whether the \nInterconnection Request is valid.  If the Interconnection Request continues \nto fail to meet the requirements set forth in LLIP Section 4.2.1, the \nParticipating TO shall include in its notification to the Large Load \nInterconnection Customer the reasons for such failure.  If an \nInterconnection Request has not been deemed valid, the Large Load \nInterconnection Customer must submit all information necessary to meet \nthe requirements of LLIP Section 4.2.1 no later than twenty (20) Business \nDays after the date the original Interconnection Request was submitted, or \nten (10) Business Days after the Participating TO first provided notice that \nthe Interconnection Request was not valid, whichever is later.  \nInterconnection Requests that have not met the requirements of LLIP \nSection 4.2.1 within twenty (20) Business Days after the date the original \nInterconnection Request was submitted or ten (10) Business Days after the \nParticipating TO first provided notice that the Interconnection Request"},{"page":380,"startToken":139570,"endToken":139980,"text":"15 \n \nwas not valid, whichever is later, will be deemed invalid, will be returned \nto the Large Load Interconnection Customer in accordance with Section \n10A.2.3 of the TO Tariff, and will not be included in the LLIP.  \n \nInterconnection Requests deemed invalid under this LLIP Section 4.3.2 \nare not subject to LLIP Section 3.9.  Large Load Interconnection \nCustomers with invalid Interconnection Requests under this LLIP Section \n4.3.2 may seek relief under LLIP Section 7.2 by so notifying the \nParticipating TO within two (2) Business Days of the notice of invalidity. \n \n4.4     Potential Deferral of the Interconnection Studies \n \n           The Participating TO may defer commencement of the Large Load \nInterconnection Study when it determines, using Good Utility Practice and \nreasonable engineering judgment, that the Interconnection Request cannot be \nstudied meaningfully until other pending study results for higher-queued projects \nare available. \n \n           Within ten (10) Business Days after deeming an Interconnection Request valid \nunder LLIP Section 4.3.1, the Participating TO will notify the Large Load \nInterconnection Customer in writing if it is deferring the start of the \nInterconnection Studies. The notice will include: (i) information regarding the \npending studies; and (ii) the estimated start date of the Large Load \nInterconnection Study.  During the period of deferral, the Participating TO will \nprovide a monthly status update to the Large Load Interconnection Customer. \n \n \n4.5 \nScoping Meeting \nWithin fifteen (15) Business Days after the Participating TO notifies the Large \nLoad Interconnection Customer that the Interconnection Request has been \ndeemed valid as set forth in LLIP Section 4.3.2, the Participating TO shall \nestablish a date agreeable to the Large Load Interconnection Customer, and the \nISO, if applicable, for the Scoping Meeting.   \n \nThe purpose of the Scoping Meeting shall be to discuss reasonable Service \nCommencement Dates and alternative interconnection options, to exchange \ninformation including any transmission data that would reasonably be expected to \nimpact such interconnection options, to analyze such information and to \ndetermine the potential feasible Points of Interconnection and eliminate \nalternatives given resources and available information. The Scoping Meeting shall \nalso include discussion of a deferral of the Interconnection Studies in accordance \nwith LLIP Section 4.4.     \n \nThe Participating TO will bring to the meeting, as reasonably necessary to \naccomplish its purpose, such already available technical data, including, but not \nlimited to, (i) general facility loadings, (ii) general instability issues, (iii) general \nshort circuit issues, (iv) general voltage issues, and (v) general reliability issues."},{"page":381,"startToken":139980,"endToken":140446,"text":"16 \n \n \nThe Large Load Interconnection Customer will bring to the Scoping Meeting, in \naddition to the technical data form (Appendix A to Attachment 1) submitted with \nits Interconnection Request, any system studies previously performed.  The \nParticipating TO, the ISO, if applicable, and the Large Load Interconnection \nCustomer will also bring to the meeting personnel and other resources as may be \nreasonably required to accomplish the purpose of the meeting in the time \nallocated for the meeting.  On the basis of the meeting, the Large Load \nInterconnection Customer shall designate its Point of Interconnection.  The \nduration of the meeting shall be sufficient to accomplish its purpose. \n \nWithin five (5) Business Days after the Scoping Meeting, the Participating TO  \nshall tender to the Large Load Interconnection Customer a Large Load Study \nProcess Agreement developed by the Participating TO consistent with the TO \nTariff and this LLIP, which shall contain an outline of the scope of the Large \nLoad Interconnection Study, contain a non-binding good faith estimate of the cost \nto perform such study, and shall specify that the Large Load Interconnection \nCustomer is responsible for the actual cost of the Interconnection Studies, \nincluding reasonable administrative costs.  No later than thirty (30) Calendar Days \nafter the Scoping Meeting, the Large Load Interconnection Customer shall either \nexecute and deliver to the Participating TO  the Large Load Study Process \nAgreement or request that the Participating TO file it unexecuted with FERC, or \nthe Interconnection Request shall be deemed withdrawn.  If an unexecuted filing \nis requested, the Interconnection Studies will be paused until the Large Load \nStudy Process Agreement is made effective by FERC. \n \n4.6 \nInterconnection Studies \nThe Interconnection Studies shall consist of a Large Load Interconnection Study, \nany FILI Study requested pursuant to LLIP Section 4.6.2, and any additional \nstudies, including but not limited to those identified in LLIP Section 4.6.3 \nrequired for interconnection of the Large Load, and co-located generation not \nexporting to the ISO Controlled Grid, to the Participating TO’s Transmission \nSystem.    The analysis of impacts on, and upgrades required to, the Participating \nTO’s Transmission System will be performed by the Participating TO and will be \nsubject to the review and concurrence of the ISO in accordance with Section 25.7 \nof the ISO Tariff. The Interconnection Studies will identify Participating TO’s \nInterconnection Facilities and required Large Load Network Upgrades necessary \nto mitigate thermal overloads and voltage violations, and address short circuit, \nstability, and reliability issues associated with the requested Transmission \nInterconnection Service.  \n \nAll cost estimates for Participating TO’s Interconnection Facilities and Large \nLoad Network Upgrades, as applicable, contained in the Interconnection Studies \nwill be set forth in the Interconnection Study report in present dollar costs as well \nas time-adjusted dollar costs, adjusted to the estimated year of construction of the \ncomponents being constructed."},{"page":382,"startToken":140446,"endToken":140799,"text":"17 \n \n \nThe Participating TO will prepare an Interconnection Study report to document \nthe results of the Interconnection Studies.   \n \n4.6.1 Large Load Interconnection Study.  \n \n \n4.6.1.1  Scope of the Large Load Interconnection Study.  The Large \nLoad Interconnection Study will consist of a  short circuit analysis, \na power flow analysis, an electromagnetic transient (“EMT”) \nscreening, a non-binding good faith estimate of the scope and cost \nof the Participating TO’s Interconnection Facilities and Large Load \nNetwork Upgrades, and any other studies that are deemed \nnecessary. The Large Load Interconnection Study will also identify \nthe need for any additional studies (e.g., stability analysis, EMT \nstudy, etc.) to be performed as part of the scope of work set forth in \nthe Large Load Interconnection Agreement pursuant to LLIP \nSection 4.6.3.  When there is co-located generation not exporting \nto the ISO Controlled Grid and not subject to electrical short \ncircuit duty dependence, the Large Load Interconnection Study \nwill identify the impacts associated with the Large Load and any \nincremental impacts of the co-located generation.       \nThe Large Load Interconnection Study will consider the use of \nalternative transmission technologies including dynamic line \nratings, advanced power flow control devices, advanced \nconductors, and transmission switching, when evaluating \ntransmission solutions to accommodate new Large Loads and their \nassociated transmission system impacts.  If traditional network \nupgrades are selected instead of alternative transmission \ntechnologies, the Participating TO will provide a demonstration of \nwhy alternative transmission technologies are not feasible or would \nnot result in lower costs or a faster timeline for accommodating the \ninterconnection of the Large Load.  \nThe Large Load Interconnection Study shall state the assumptions \nupon which it is based, state the results of the analyses, and \nprovide the requirement or potential impediments to providing the \nrequested Transmission Interconnection Service, including an \nestimate of the cost and length of time that would be necessary to \ncorrect any problems identified in those analyses and implement \nthe Interconnection.   \n \nThe Large Load Interconnection Study shall provide a list of \nParticipating TO’s Interconnection Facilities and Large Load \nNetwork Upgrades, as applicable, that are required as a result of \nthe Interconnection Request."},{"page":383,"startToken":140799,"endToken":141186,"text":"18 \n \n4.6.1.2 Timing of the Large Load Interconnection Study Results.  The \nParticipating TO shall use Reasonable Efforts to complete the \nLarge Load Interconnection Study within ninety (90) Calendar \nDays after the execution of a Large Load Study Process Agreement \nor, if the Large Load Study Process Agreement is filed unexecuted, \nafter it is made effective by FERC.  The Participating TO will \nissue a Large Load Interconnection Study report to the Large Load \nInterconnection Customer. The Participating TO will share study \nresults with the ISO for review and concurrence.   \n \nAt any time the Participating TO determines that it will not meet \nthe required time frame for completing the Large Load \nInterconnection  Study, Participating TO shall notify the Large \nLoad Interconnection Customer as to the schedule status of the \nLarge Load Interconnection Study and provide an estimated \ncompletion date with an explanation of the reasons why additional \ntime is required. \n \nUpon request, the Participating TO shall provide the Large Load \nInterconnection Customer all supporting documentation, \nworkpapers and relevant pre-Interconnection Request and post-\nInterconnection Request power flow and short circuit databases for \nthe Large Load Interconnection Study, subject to confidentiality \narrangements consistent with LLIP Section 7.1. \n \nShould the Large Load Interconnection Customer provide written \ncomments on the Large Load Interconnection Study report at least \nfive (5) Business Days before the Report Meeting conducted to \ndiscuss the report, the Participating TO will address the written \ncomments in the Large Load Interconnection Study Report \nMeeting.  Should the Large Load Interconnection Customer \nprovide comments at any later time (up to the time of the Report \nMeeting), then such comments shall be considered informal \ninquiries to which the Participating TO will provide informal, \ninformational responses at the Report Meeting, to the extent \npossible.  \n \nThe Large Load Interconnection Customer may submit, in writing, \nadditional comments on the final Large Load Interconnection \nStudy report up to three (3) Business Days following the Report \nMeeting.  Based on any discussion at the Report Meeting and any \ncomments received from the Large Load Interconnection Customer \nor the ISO, the Participating TO will determine whether it is \nnecessary to follow the Large Load Interconnection Study report \nwith a revised study report.  The Participating TO will issue any \nsuch revised report to the Large Load Interconnection Customer no \nlater than fifteen (15) Business Days following the Report"},{"page":384,"startToken":141186,"endToken":141526,"text":"19 \n \nMeeting. If the ISO has not completed its review of the Large Load \nInterconnection Study report, the Participating TO shall delay its \ndetermination of whether a revised study report is required until \nthat review is complete. \n \n \n \n \n \n \n4.6.1.3 Large Load Interconnection Study Report Meeting.  A Report \nMeeting shall be held among the Participating TO, the ISO, if \napplicable, and the Large Load Interconnection Customer to \ndiscuss the results of the Large Load Interconnection Study, \nincluding assigned cost responsibility.  Any such Report Meeting \nwill be held within ten (10) Business Days of the date the Large \nLoad Interconnection Study report is provided to the Large Load \nInterconnection Customer.  \n \n4.6.1.4 Commercial Readiness Deposit.  Within thirty (30) Calendar \nDays after receiving the final Large Load Interconnection Study \nreport, the Large Load Interconnection Customer shall provide an \nadditional Commercial Readiness Deposit sufficient to bring the \naggregate Commercial Readiness Deposit to twenty percent (20%) \nof the Participating TO’s then-current estimated construction cost \nof the Large Load Network Upgrades identified in that report that \nare attributable to the Interconnection Request.  If the final Large \nLoad Interconnection Study report is revised following ISO \nreview, the required Commercial Readiness Deposit shall be \nadjusted to reflect twenty percent (20%) of the corresponding \nestimated construction cost identified in the revised final report, \nand any required increase shall be provided within thirty (30) \nCalendar Days after issuance of that report.  \n \n \nThe Commercial Readiness Deposit secures the Withdrawal \nPenalty and other pre-in-service obligations under this LLIP and \nthe Large Load Interconnection Agreement. It does not establish a \ndirect assignment of the Large Load Network Upgrade costs, \nconstitute a payment toward an Annual MTRC, reduce the Total \nRequired Revenue Commitment, or satisfy Operational Security \nunder a Cost Recovery Agreement. \n \nTo the extent a Commercial Readiness Deposit is in a form \npermitted under Schedule 3 of an applicable Cost Recovery \nAgreement, DesertLink may elect in writing to credit it dollar-for-\ndollar toward required Construction Security under that agreement. \nNo amount of Commercial Readiness Deposit may be applied or"},{"page":385,"startToken":141526,"endToken":141912,"text":"20 \n \ncredited more than once. Any portion not so credited shall be \nadministered and released under Sections 3.9 and 3.10 of this LLIP \nand the Large Load Interconnection Agreement. \n   \n4.6.1.5 Restudy. If restudy of the Large Load Interconnection Study is \nrequired due to a higher queued project dropping out of the queue, \nor a modification of a higher queued project subject to LLIP \nSection 4.6.1.6, Participating TO shall notify Large Load \nInterconnection Customer in writing. Such restudy shall take no \nlonger than forty-five (45) Calendar Days from the date of notice. \nAny cost of restudy shall be borne by the Large Load \nInterconnection Customer. \n \n4.6.1.6 Modifications.  At any time during the course of the \nInterconnection Studies, the Large Load Interconnection Customer, \nthe Participating TO, or the ISO, as applicable, may identify \nchanges to the planned interconnection that may improve the costs \nand benefits (including reliability) of the interconnection, and the \nability of the proposed change to accommodate the Interconnection \nRequest.  To the extent the identified changes are acceptable to the \nParticipating TO, the ISO, as applicable, and Large Load \nInterconnection Customer, such acceptance not to be unreasonably \nwithheld, Participating TO shall modify the configuration in \naccordance with such changes without altering the Interconnection \nRequest’s eligibility for participating in Interconnection Studies.          \n \n4.6.1.6.1 For any modifications other than those agreed upon under \nLLIP Section 4.6.1.6, the Large Load Interconnection \nCustomer must first request that Participating TO evaluate \nwhether such modification is a Material Modification.  In \nresponse to Large Load Interconnection Customer's \nrequest, Participating TO, in coordination with the ISO, if \napplicable, shall evaluate the proposed modifications prior \nto making them and inform Large Load Interconnection \nCustomer in writing of whether the modifications would \nconstitute a Material Modification.  The Participating TO \nmay, at its option, engage the services of the ISO to assist \nin the assessment of the modification.  Any change to the \nPoint of Interconnection shall constitute a Material \nModification.   \n \n \n \nThe Large Load Interconnection Customer shall provide \nthe Participating TO a $30,000 deposit for the modification \nassessment at the time the request is submitted.  Except as \nprovided below, any modification assessment will be \nconcluded, and a response provided to the Large Load \nInterconnection Customer in writing, within forty-five (45)"},{"page":386,"startToken":141912,"endToken":142268,"text":"21 \n \nCalendar Days from the date the Participating TO receives \nall of the following: 1) the Large Load Interconnection \nCustomer’s written notice to modify the project; 2) a \nnarrative description of the requested modification; 3) \ntechnical data required to assess the request, including an \nupdated technical data form (Appendix A to Attachment 1 \nto this LLIP), if requested by the Participating TO; 4) any \nadditional information requested by Participating TO; and \n5) payment of the $30,000 deposit.  If applicable, the \nParticipating TO shall coordinate the modification request \nwith the ISO.  If the modification assessment cannot be \ncompleted within that time period, the Participating TO \nshall notify the Large Load Interconnection Customer and \nprovide an estimated completion date with an explanation \nof the reasons why additional time is required.  The Large \nLoad Interconnection Customer will be responsible for the \nactual costs incurred by the Participating TO and, if \napplicable, the ISO in conducting the modification \nassessment.  If the actual costs of the modification \nassessment are less than the deposit provided by the Large \nLoad Interconnection Customer, the Large Load \nInterconnection Customer will be refunded the balance \nwithin thirty (30) Calendar Days of being invoiced.  If the \nactual costs of the modification assessment are greater than \nthe deposit provided by the Large Load Interconnection \nCustomer, the Large Load Interconnection Customer shall \npay the balance within thirty (30) Calendar Days of being \ninvoiced. \n \nIf the proposed modification is determined to be a Material \nModification by the Participating TO pursuant to the \nmodification assessment described above, the Large Load \nInterconnection Customer shall then either:  \n \n(i) \nwithdraw the proposed modification, or  \n \n(ii) withdraw the proposed modification and submit a \nnew Interconnection Request reflecting such \nmodification. \n \n4.6.2   Optional Flexible Interim Load Interconnection (FILI) Study and \nAgreement. If the Large Load Interconnection Study finds that the full \namount of the Interconnection Request cannot be accommodated prior to \nthe time that all ECLL Interconnection Facilities are in service, the Large \nLoad Interconnection Customer may request a FILI Study, by written \nnotice to the Participating TO within thirty (30) Calendar Days after \nreceipt of the final Large Load Interconnection Study report, to"},{"page":387,"startToken":142268,"endToken":142697,"text":"22 \n \ndetermine, consistent with Section 10A.4 of the TO Tariff, whether \nInterim Firm Interconnection Service and/or FILI Service may be \nprovided.  A Large Load Interconnection Customer may elect to be \nstudied only for Interim Firm Interconnection Service and not FILI \nService.  If the Large Load Interconnection Customer elects to proceed \nwith a FILI Study, the Participating TO shall use Reasonable Efforts to \ncomplete the FILI Study within sixty (60) Calendar Days after receipt of \nsuch request. Large Load Interconnection Customer will be responsible \nfor the actual costs of the FILI Study. The Participating TO will perform \nthe FILI Study. At any time the Participating TO determines that it will \nnot meet the required time frame for completing the FILI Study, \nParticipating TO shall notify the Large Load Interconnection Customer as \nto the schedule status of the FILI Study and provide an estimated \ncompletion date with an explanation of the reasons why additional time is \nrequired. \n \n \n \n The FILI Study will determine (i) the maximum amount of Interim Firm \nInterconnection Service, if any, that can be provided prior to completion \nof the Participating TO’s Interconnection Facilities and Large Load \nNetwork Upgrades; (ii) whether the Large Load Interconnection \nCustomer is eligible to receive FILI Service and the maximum amount of \nsuch service; (iii) the conditions and limitations of such service; (iv) the \nupgrades and the associated cost; and (v) the estimated duration required \nto provide the interim service. The Participating TO will share study \nresults with the ISO for review and concurrence.  The Participating TO \nshall update its analysis of the availability of FILI Service at least \nannually under the terms of the FILI Service Agreement, and the actual \namount of FILI Service available during any operating period shall be \ndetermined by the Participating TO through operational assessments \nconducted closer to real-time operating conditions, consistent with \nSection 10A.4 of the TO Tariff.  If requested by the Large Load \nInterconnection Customer within ten (10) Business Days of the date of \nthe issuance of the FILI Study report, a Report Meeting shall be \nscheduled among the Participating TO, the ISO, and the Large Load \nInterconnection Customer. \n \n \n \nThe Large Load Interconnection Customer should note the following \nconsiderations: \na) \nTemporary limits may be adjusted if unforeseen conditions arise. \nb) \nAdvance notice of non-firm load curtailment may not be possible. \nc) \nNon-firm load may be curtailed during planned or repair outages, \nwhich may last longer than 6 months. \nd) \nISO may have additional operational requirements. \ne) \nParticipating TO is not obligated to provide flexibility beyond \nwhat it can, in its sole judgment, manage operationally."},{"page":388,"startToken":142697,"endToken":143143,"text":"23 \n \nf) \nParticipating TO’s Interconnection Facilities costs for interim \ninterconnection service will be directly assigned to the Large Load \nInterconnection Customer. \ng) \nLarge Load Interconnection Customers not adhering to the \ncontractual agreement and conditions may be curtailed indefinitely.  \n \n4.6.2.1 FILI Service Agreement. If the Large Load Interconnection \nCustomer has elected FILI Service, as reflected in the Large Load \nInterconnection Agreement, the Large Load Interconnection \nCustomer shall ensure that, prior to the Service Commencement \nDate, the Large Load Customer executes, or requests to be filed \nunexecuted with FERC, a FILI Service Agreement with the \nParticipating TO and, as applicable, the ISO, developed by the \nParticipating TO consistent with Section 10A.4 of the TO Tariff \nand in accordance with ISO Tariff Section 25.7.2. The FILI \nService Agreement shall describe the circumstances in which the \nISO or Participating TO may temporarily curtail the Large Load \nreceiving FILI Service, and the mechanism the ISO or \nParticipating TO will use to perform the curtailment. The ISO will \npost such FILI Service Agreements on the ISO Website.  \n \n4.6.3   Additional Studies. The Participating TO may identify the need for \nadditional studies to comply with Applicable Reliability Standards. These \nadditional studies may include, but are not limited to, the following: \nstability analysis, variable load impact analysis, and EMT analysis.  The \nassociated new scope will be identified in the Large Load Interconnection \nStudy pursuant to LLIP Section 4.6.1.1. The additional studies will be \nperformed by the Participating TO as part of the scope of work set forth in \nthe Large Load Interconnection Agreement. The additional studies may \nresult in the identification of additional facilities scope and cost, and may \nrequire a revision to the schedule set forth in the Large Load \nInterconnection Agreement. The Large Load Interconnection Customer \nwill be responsible for providing the necessary technical information \nand/or models requested by the Participating TO to conduct the additional \nstudies. The Large Load Interconnection Customer will be responsible for \nthe costs of such studies.            \n \nIf an additional study results in the need to revise the scope of work of the \nLarge Load Network Upgrades identified in the Large Load \nInterconnection Study and the updated assigned costs have increased by \nmore than twenty-five percent (25%) compared to costs identified in the \nLarge Load Interconnection Study report, the Large Load Interconnection \nCustomer shall not be subject to a Withdrawal Penalty under LLIP Section \n3.10.1 if the Interconnection Request is withdrawn within thirty (30) \nCalendar Days of receipt of the additional study report.  If the Large Load \nInterconnection Customer elects to continue with its Interconnection \nRequest, the Large Load Interconnection Agreement will be amended to"},{"page":389,"startToken":143143,"endToken":143507,"text":"24 \n \nreflect the results of the additional study. \n \n4.6.4   Financing of Participating TO’s Interconnection Facilities and Large \nLoad Network Upgrades.  The responsibility to finance Participating \nTO’s Interconnection Facilities shall be assigned solely to the Large Load \nInterconnection Customer. The Participating TO will be responsible for \nfinancing Large Load Network Upgrades in accordance with the Large \nLoad Interconnection Agreement and, as to any Large Load Network \nUpgrades that constitute Large Load-Driven Upgrades, the Cost Recovery \nAgreement required under LLIP Section 5.3.   \n \n4.7 \nInterconnection Financial Security   \n \n4.7.1 Types of Interconnection Financial Security.  The Interconnection \nFinancial Security posted by a Large Load Interconnection Customer may \nbe any combination of the following types of Interconnection Financial \nSecurity provided in favor of the Participating TO: \n \n(a) \nan irrevocable and unconditional letter of credit issued by a bank \nor financial institution that has a credit rating of A or better by \nStandard and Poor’s or A2 or better by Moody’s;  \n \n(b) \nan irrevocable and unconditional surety bond issued by an \ninsurance company that has a credit rating of A or better by \nStandard and Poor’s or A2 or better by Moody’s; \n \n(c) \nan unconditional and irrevocable guaranty issued by a company \nthat has a credit rating of A or better by Standard and Poor’s or A2 \nor better by Moody’s; \n \n(d) \na cash deposit standing to the credit of the Participating TO and in \nan interest-bearing escrow account maintained at a bank or \nfinancial institution that is reasonably acceptable to the \nParticipating TO; \n \n(e) \na certificate of deposit in the name of the Participating TO issued \nby a bank or financial institution that has a credit rating of A or \nbetter by Standard and Poor’s or A2 or better by Moody’s; or  \n \n(f) \na payment bond certificate in the name of the Participating TO \nissued by a bank or financial institution that has a credit rating of A \nor better by Standard and Poor’s or A2 or better by Moody’s.  \n \nInterconnection Financial Security instruments as listed above shall be in \nsuch form as the Participating TO may reasonably require from time to \ntime by notice to Large Load Interconnection Customers, or in such other"},{"page":390,"startToken":143507,"endToken":143940,"text":"25 \n \nform as has been evaluated and approved as reasonably acceptable by the \nParticipating TO.     \n \nThe Participating TO shall require the use of standardized forms of \nInterconnection Financial Security to the greatest extent possible.  If at any \ntime the guarantor of the Interconnection Financial Security fails to \nmaintain the credit rating required by this LLIP Section 4.7.1, the Large \nLoad Interconnection Customer shall provide to the Participating TO \nreplacement Interconnection Financial Security meeting the requirements \nof this LLIP Section 4.7.1 within five (5) Business Days of the change in \ncredit rating.  \n \nInterest on a cash deposit standing to the credit of the Participating TO in \nan interest-bearing escrow account under subpart (d) of this LLIP Section \n4.7.1 will accrue to the Large Load Interconnection Customer’s benefit.  \n \nExecution and filing of the Large Load Interconnection Agreement at \nFERC are addressed in LLIP Section 5. \n \nSection 5. \nLarge Load Interconnection Agreement  \n \n5.1 \nTender.  Within thirty (30) Calendar Days after the Report Meeting for the final Large \nLoad Interconnection Study report or, if the Large Load Interconnection \nCustomer has timely requested a FILI Study pursuant to LLIP Section 4.6.2, \nwithin thirty (30) Calendar Days after issuance of the final FILI Study report (or, \nif a Report Meeting is requested for the FILI Study, after such Report Meeting), \nthe Participating TO shall tender to the Large Load Interconnection Customer a \ndraft Large Load Interconnection Agreement developed by the Participating TO \nconsistent with the TO Tariff, this LLIP, and the results of the Interconnection \nStudies.  The draft Large Load Interconnection Agreement shall address, without \nlimitation, the scope, schedule, cost responsibility, payment provisions, cost \nrecovery, and financial security for the Participating TO’s Interconnection \nFacilities and Large Load Network Upgrades, and any applicable operating \nrequirements.  The Large Load Interconnection Customer shall provide written \ncomments, or notification of no comments, on the draft Large Load \nInterconnection Agreement within thirty (30) Calendar Days. \n \n5.2 \nNegotiation.  Notwithstanding LLIP Section 5.1, at the request of Large Load \nInterconnection Customer, Participating TO shall begin negotiations with Large \nLoad Interconnection Customer concerning the terms and conditions of the Large \nLoad Interconnection Agreement at any time after the Participating TO provides \nthe Large Load Interconnection Customer with the final Large Load \nInterconnection Study report, or the final FILI Study report, if applicable.  \nParticipating TO and Large Load Interconnection Customer shall negotiate in \ngood faith concerning any disputed provisions of the draft Large Load \nInterconnection Agreement for not more than sixty (60) Calendar Days after the \nParticipating TO provides the Large Load Interconnection Customer with the final"},{"page":391,"startToken":143940,"endToken":144450,"text":"26 \n \nLarge Load Interconnection Study report or the final FILI Study report if \napplicable.  If Large Load Interconnection Customer determines that negotiations \nare at an impasse, it may request termination of the negotiations at any time after \ntender of the draft Large Load Interconnection Agreement pursuant to LLIP \nSection 5.1 and request submission of the unexecuted Large Load Interconnection \nAgreement with FERC or initiate Dispute Resolution procedures pursuant to LLIP \nSection 7.2.  If Large Load Interconnection Customer requests termination of the \nnegotiations, but within sixty (60) Calendar Days after issuance of the final Large \nLoad Interconnection Study report, or the final FILI Study report if applicable, \nfails to request either the filing of the unexecuted Large Load Interconnection \nAgreement or initiate Dispute Resolution, it shall be deemed to have withdrawn \nits Interconnection Request.  Unless otherwise agreed by the Parties, if Large \nLoad Interconnection Customer has not executed the Large Load Interconnection \nAgreement, requested filing of an unexecuted Large Load Interconnection \nAgreement, or initiated Dispute Resolution procedures pursuant to LLIP Section \n7.2 within the time period set forth in LLIP Section 5.3, it shall be deemed to have \nwithdrawn its Interconnection Request.  Participating TO shall provide to Large \nLoad Interconnection Customer a final Large Load Interconnection Agreement \nwithin fifteen (15) Business Days after the completion of the negotiation process. \n \n \nThe Participating TO may declare an impasse upon sixty (60) Calendar Days after \nissuance of the final Large Load Interconnection Study report, or the final FILI \nStudy report if applicable, or at any time following sixty (60) Calendar Days after \nissuance of the final Large Load Interconnection Study report, or the final FILI \nStudy report if applicable, if the Parties have agreed to extend negotiation of the \nLarge Load Interconnection Agreement.  If the Participating TO declares an \nimpasse, the Participating TO will file the Large Load Interconnection Agreement \nunexecuted with FERC within twenty-one (21) Calendar Days. \n \n5.3 \nExecution and Filing \nWithin thirty (30) Business Days after receipt of the final Large Load \nInterconnection Agreement, Large Load Interconnection Customer shall either: (i) \nexecute the final Large Load Interconnection Agreement and return it to \nParticipating TO; or (ii) request in writing that Participating TO file with FERC \nthe Large Load Interconnection Agreement in unexecuted form, or its \nInterconnection Request shall be deemed withdrawn and subject to LLIP Section \n3.10.  To the extent FERC filing is required, as soon as practicable, but not later \nthan ten (10) Business Days after receiving either the executed Large Load \nInterconnection Agreement or the request to file an unexecuted Large Load \nInterconnection Agreement, Participating TO shall file the Large Load \nInterconnection Agreement with FERC, together with, in the case of an \nunexecuted Large Load Interconnection Agreement, its explanation of any matters \nas to which Large Load Interconnection Customer and Participating TO disagree \nand support for the costs that Participating TO proposes to charge to Large Load \nInterconnection Customer under the Large Load Interconnection Agreement.  An \nunexecuted Large Load Interconnection Agreement should contain terms and \nconditions deemed appropriate by Participating TO for the Interconnection"},{"page":392,"startToken":144450,"endToken":144851,"text":"27 \n \nRequest.  If the Parties agree to proceed with design, procurement, and \nconstruction of facilities and upgrades under the agreed-upon terms of the \nunexecuted Large Load Interconnection Agreement, they may proceed pending \nFERC action.  As a condition to the Participating TO’s design, procurement, \nconstruction, or operation of any Large Load-Driven Upgrades (as defined in the \npro forma Large Load Cost Recovery Agreement set forth in Appendix V to the \nTO Tariff) associated with the Interconnection Request, the Large Load \nInterconnection Customer shall also, within the same period and subject to the \nsame consequences as the Large Load Interconnection Agreement, execute and \nmaintain a Cost Recovery Agreement substantially in the form set forth in \nAppendix V to the TO Tariff, or, if the Large Load Interconnection Customer \nrequests that the Cost Recovery Agreement be filed unexecuted with FERC, \ncomply with that agreement as made effective by FERC.  A Cost Recovery \nAgreement required by this LLIP Section 5.3 is entered into pursuant to the TO \nTariff. \n \n \n5.4 \nCommencement of Interconnection Activities \nIf Large Load Interconnection Customer executes the final Large Load \nInterconnection Agreement, Participating TO and Large Load Interconnection \nCustomer shall perform their respective obligations in accordance with the terms \nof the Large Load Interconnection Agreement, subject to modification by FERC.  \nUpon submission of an unexecuted Large Load Interconnection Agreement, Large \nLoad Interconnection Customer and Participating TO shall promptly comply with \nthe unexecuted Large Load Interconnection Agreement, if agreed to by the Parties \npursuant to LLIP Section 5.3, subject to modification by FERC. \n \nSection 6. \nConstruction of Participating TO's Interconnection Facilities and Large \nLoad Network Upgrades  \n \n \n6.1 \nSchedule \nParticipating TO and Large Load Interconnection Customer shall negotiate in \ngood faith concerning a schedule for the Participating TO’s construction of \nParticipating TO's Interconnection Facilities and the Large Load Network \nUpgrades.  \n \n \n6.2 \nConstruction Sequencing \n \n6.2.1 General.  In general, the Service Commencement Date will determine the \nsequence of construction of Large Load Network Upgrades. \n \n6.2.2 Advancing Construction of Large Load Network Upgrades that are \nPart of an Expansion Plan of the Participating TO.  A Large Load \nInterconnection Customer with a Large Load Interconnection Agreement, \nin order to maintain its Service Commencement Date, may request that \nParticipating TO advance to the extent necessary the completion of Large \nLoad Network Upgrades that:  (i) are necessary to support such Service \nCommencement Date and (ii) would otherwise not be completed, pursuant"},{"page":393,"startToken":144851,"endToken":145249,"text":"28 \n \nto an expansion plan of Participating TO or approved ISO Transmission \nPlan covering the Participating TO’s facilities, in time to support such \nService Commencement Date.  Upon such request, Participating TO will \nuse Reasonable Efforts to advance the construction of such Large Load \nNetwork Upgrades to accommodate such request; provided that Large \nLoad Interconnection Customer commits to pay Participating TO any \nassociated expediting costs.   \n \n6.3 \nSpecial Provisions for Affected Systems   \nThe Large Load Interconnection Customer shall timely enter into and maintain an \nagreement with each applicable Affected System Operator for each addition, \nmodification, or upgrade to an Affected System identified through the \nInterconnection Studies or an applicable Affected System study.  The agreement \nshall specify the terms governing payments to be made by the Large Load \nInterconnection Customer to the Affected System Operator, including financial \nsecurity or credit support sufficient to protect the Affected System Operator and \nits other customers against cost shifting.  Where a Cost Recovery Agreement \napplies, the Large Load Interconnection Customer shall provide the Participating \nTO the evidence of such agreements required by, and within the time specified in, \nthe Cost Recovery Agreement, and the Participating TO may decline to \ncommence, or may suspend, construction as provided in the Cost Recovery \nAgreement.   \n \nSection 7. \nMiscellaneous \n \n7.1 \nConfidentiality \n \nFor the purposes of this LLIP Section 7.1, “Party” or “Parties” shall mean the \nParticipating TO, Large Load Interconnection Customer, ISO, or any combination \nof the Participating TO, Large Load Interconnection Customer, or ISO.  \n \nConfidential Information shall include, without limitation, all information relating \nto a Party's technology, research and development, business affairs, and pricing. \n \nInformation is Confidential Information only if it is clearly designated or marked \nin writing as confidential on the face of the document, or, if the information is \nconveyed orally or by inspection, if the Party providing the information orally \ninforms the Party receiving the information that the information is confidential. \n \nIf requested by either Party, the other Party shall provide in writing, the basis for \nasserting that the information referred to in this LLIP Section 7.1 warrants \nconfidential treatment, and the requesting Party may disclose such writing to the \nappropriate Governmental Authority.  Each Party shall be responsible for the \ncosts associated with affording confidential treatment to its information. \n \n \n \n7.1.1 Scope.  Confidential Information shall not include information that the \nreceiving Party can demonstrate: (1) is generally available to the public"},{"page":394,"startToken":145249,"endToken":145707,"text":"29 \n \nother than as a result of a disclosure by the receiving Party; (2) was in the \nlawful possession of the receiving Party on a non-confidential basis before \nreceiving it from the disclosing Party; (3) was supplied to the receiving \nParty without restriction by a third party, who, to the knowledge of the \nreceiving Party after due inquiry, was under no obligation to the disclosing \nParty to keep such information confidential; (4) was independently \ndeveloped by the receiving Party without reference to Confidential \nInformation of the disclosing Party; (5) is, or becomes, publicly known, \nthrough no wrongful act or omission of the receiving Party or Breach of \nthe Large Load Interconnection Agreement; or (6) is required, in \naccordance with LLIP Section 7.1.6, Order of Disclosure, to be disclosed \nby any Governmental Authority or is otherwise required to be disclosed by \nlaw or subpoena, or is necessary in any legal proceeding establishing \nrights and obligations under the Large Load Interconnection Agreement. \nInformation designated as Confidential Information will no longer be \ndeemed confidential if the Party that designated the information as \nconfidential notifies the other Party that it no longer is confidential. \n \n7.1.2  Release of Confidential Information.  Neither Party shall release or \ndisclose Confidential Information to any other person, except to its \nAffiliates (limited by the Standards of Conduct requirements), employees, \nconsultants, Affected System Operators, the Large Load Customer, or to \nparties who may be providing or considering providing financing to or \nequity participation with Large Load Interconnection Customer or the \nLarge Load Customer, or to potential purchasers or assignees of Large \nLoad Interconnection Customer or the Large Load Customer, on a need-\nto-know basis in connection with these procedures, unless such person has \nfirst been advised of the confidentiality provisions of this LLIP Section 7.1 \nand has agreed to comply with such provisions.  Notwithstanding the \nforegoing, a Party providing Confidential Information to any person shall \nremain primarily responsible for any release of Confidential Information \nin contravention of this LLIP Section 7.1. \n \n7.1.3 Rights.  Each Party retains all rights, title, and interest in the Confidential \nInformation that each Party discloses to the other Party.  The disclosure by \neach Party to the other Party of Confidential Information shall not be \ndeemed a waiver by either Party or any other person or entity of the right \nto protect the Confidential Information from public disclosure. \n \n7.1.4 No Warranties.  By providing Confidential Information, neither Party \nmakes any warranties or representations as to its accuracy or \ncompleteness.  In addition, by supplying Confidential Information, neither \nParty obligates itself to provide any particular information or Confidential \nInformation to the other Party nor to enter into any further agreements or \nproceed with any other relationship or joint venture."},{"page":395,"startToken":145707,"endToken":146217,"text":"30 \n \n7.1.5 Standard of Care.  Each Party shall use at least the same standard of care \nto protect Confidential Information it receives as it uses to protect its own \nConfidential Information from unauthorized disclosure, publication or \ndissemination.  Each Party may use Confidential Information solely to \nfulfill its obligations to the other Party under these procedures or its \nregulatory requirements. \n \n7.1.6 Order of Disclosure.  If a court or a Governmental Authority or entity \nwith the right, power, and apparent authority to do so requests or requires \neither Party, by subpoena, oral deposition, interrogatories, requests for \nproduction of documents, administrative order, or otherwise, to disclose \nConfidential Information, that Party shall provide the other Party with \nprompt notice of such request(s) or requirement(s) so that the other Party \nmay seek an appropriate protective order or waive compliance with the \nterms of these confidentiality provisions. Notwithstanding the absence of a \nprotective order or waiver, the Party may disclose such Confidential \nInformation which, in the opinion of its counsel, the Party is legally \ncompelled to disclose.  Each Party will use Reasonable Efforts to obtain \nreliable assurance that confidential treatment will be accorded any \nConfidential Information so furnished. \n \n7.1.7 Remedies.  The Parties agree that monetary damages would be inadequate \nto compensate a Party for the other Party's Breach of its obligations under \nthis LLIP Section 7.1.  Each Party accordingly agrees that the other Party \nshall be entitled to equitable relief, by way of injunction or otherwise, if \nthe first Party Breaches or threatens to Breach its obligations under this \nLLIP Section 7.1, which equitable relief shall be granted without bond or \nproof of damages, and the receiving Party shall not plead in defense that \nthere would be an adequate remedy at law.  Such remedy shall not be \ndeemed an exclusive remedy for the Breach of this LLIP Section 7.1, but \nshall be in addition to all other remedies available at law or in equity.  The \nParties further acknowledge and agree that the covenants contained herein \nare necessary for the protection of legitimate business interests and are \nreasonable in scope.  No Party, however, shall be liable for indirect, \nincidental, or consequential or punitive damages of any nature or kind \nresulting from or arising in connection with this LLIP Section 7.1. \n \n7.1.8 Disclosure to FERC, its Staff, or a State.  Notwithstanding anything in \nthis LLIP Section 7.1 to the contrary, and pursuant to 18 CFR section \n1b.20, if FERC or its staff, during the course of an investigation or \notherwise, requests information from one of the Parties that is otherwise \nrequired to be maintained in confidence pursuant to the LLIP, the Party \nshall provide the requested information to FERC or its staff, within the \ntime provided for in the request for information.  In providing the \ninformation to FERC or its staff, the Party must, consistent with 18 CFR \nsection 388.112, request that the information be treated as confidential and \nnon-public by FERC and its staff and that the information be withheld"},{"page":396,"startToken":146217,"endToken":146685,"text":"31 \n \nfrom public disclosure.  Parties are prohibited from notifying the other \nParty prior to the release of the Confidential Information to FERC or its \nstaff.  The Party shall notify the other Party to the Large Load \nInterconnection Agreement when it is notified by FERC or its staff that a \nrequest to release Confidential Information has been received by FERC, at \nwhich time either of the Parties may respond before such information \nwould be made public, pursuant to 18 CFR section 388.112.  Requests \nfrom a state regulatory body conducting a confidential investigation shall \nbe treated in a similar manner, consistent with applicable state rules and \nregulations. \n \n7.1.9 Subject to the exception in LLIP Section 7.1.8, any information that a \nParty claims is competitively sensitive, commercial or financial \ninformation (\"Confidential Information\") shall not be disclosed by the \nother Party to any person not employed or retained by the other Party, \nexcept to the extent disclosure is (i) required by law; (ii) reasonably \ndeemed by the disclosing Party to be required to be disclosed in \nconnection with a dispute between or among the Parties, or the defense of \nlitigation or dispute; (iii) otherwise permitted by consent of the other \nParty, such consent not to be unreasonably withheld;  or (iv) necessary to \nfulfill its obligations under this LLIP or as a Participating TO, including \ndisclosing the Confidential Information to the ISO or to a subregional, \nregional or national reliability organization or planning group.  The Party \nasserting confidentiality shall notify the other Party in writing of the \ninformation it claims is confidential.  Prior to any disclosures of the other \nParty's Confidential Information under this subparagraph, or if any third \nparty or Governmental Authority makes any request or demand for any of \nthe information described in this subparagraph, the disclosing Party agrees \nto promptly notify the other Party in writing and agrees to assert \nconfidentiality and cooperate with the other Party in seeking to protect the \nConfidential Information from public disclosure by confidentiality \nagreement, protective order or other reasonable measures. \n \n7.1.10 This provision shall not apply to any information that was or is hereafter in \nthe public domain (except as a result of a Breach of this provision). \n \n7.1.11 Participating TO shall, at Large Load Interconnection Customer's election, \ndestroy, in a confidential manner, or return the Confidential Information \nprovided at the time the Confidential Information is no longer needed. \n \n \n7.2 \nDisputes  \n \n \n \n7.2.1  Submission.  In the event either Party has a dispute, or asserts a claim, that \narises out of or in connection with the Large Load Interconnection \nAgreement, the LLIP, or their performance, such Party (the \"disputing \nParty\") shall provide the other Party with written notice of the dispute or \nclaim (\"Notice of Dispute\").  Such dispute or claim shall be resolved in"},{"page":397,"startToken":146685,"endToken":146722,"text":"32 \n \naccordance with Section 14 of the TO Tariff, including, as applicable, the \nISO ADR Procedures; provided, however, that disputes arising under a \nCost Recovery Agreement shall be resolved under the dispute resolution \nprovisions of that agreement."},{"page":398,"startToken":146722,"endToken":146958,"text":"33 \n \n  \nATTACHMENT 1 \nTO APPENDIX VI – LARGE LOAD INTERCONNECTION PROCEDURES \n \nINTERCONNECTION REQUEST FORM \n \nThis Interconnection Request is submitted to DesertLink, LLC (“Participating TO”) by the \nEligible Customer for Large Load (“ECLL”) identified below, acting as the Large Load \nInterconnection Customer, pursuant to LLIP Section 4.2.1 and Section 10A of the TO Tariff.  \nConsistent with LLIP Section 3.1, the Large Load Interconnection Customer shall send a copy of \nthis Interconnection Request to the ISO.  Capitalized terms not defined herein have the meanings \nset forth in the LLIP or, if not defined in the LLIP, in Section 3 of the TO Tariff. \n \nI. \n Large Load Interconnection Customer (ECLL) Contact Information \nCompany Name \n \nType of ECLL (UDC or MSS) \n \nRepresentative \n \nAddress \n \nEmail \n \nPhone \n \n \nII. \nLarge Load Customer Information \nLarge Load Customer Name \n \nLarge Load Customer Representative and \nContact Information \n \nLarge Load Site Location/Address \n \nType of Large Load Facility (e.g., data \ncenter, industrial) \n \nOther ECLL interconnection requests \nsubmitted for the same Large Load \nCustomer or any of its affiliates (see \nSection 10A.2.1 of the TO Tariff) \n \n \nIII. \nPoint of Interconnection \n \nPlease identify the location and voltage \nlevel of the preferred Point of \nInterconnection in as much detail as \npossible. If proposing to connect to a \ntransmission line, provide the approximate \ndistance from one of the existing line \nterminals.  The Point of Interconnection \nwill serve as the Point of Withdrawal under \nthe TO Tariff."},{"page":399,"startToken":146958,"endToken":147162,"text":"34 \n \n \nIV. \nLarge Load Capacity and Load Ramp Schedule \n \n \nProposed load ramp schedule identifying anticipated load additions over time: \nDate (MM/DD/YYYY) \nIncremental Load (MW) \nCumulative Load (MW) \n \n \n \n \n \n \n \n \n \n \n \n \n \nV. \nProposed Service Commencement Date and Term \n \n \nVI. \nSource of Power \n \n \nVII. \nSite Plan, Site Control, and Permits \n \nPlease attach: (a) a site plan for the Large Load; (b) documentation demonstrating Site Control, \nas defined in Section 3 of the TO Tariff; and (c) documentation demonstrating that the Large \nMaximum Large Load capacity requested \nat the Point of Interconnection (MW) (see \nLLIP Section 3.6) \n \nMaximum capacity the Large Load is \ncapable of withdrawing, if greater than the \namount requested, and the proposed means \nof limiting withdrawals to the requested \namount \n \nExpected power factor and load factor \n \nProposed date for energizing the ECLL \nInterconnection (MM/DD/YYYY) \n \nProposed Service Commencement Date \n(MM/DD/YYYY) (see LLIP Section 3.7) \n \nProposed term of service (years) \n \nPlease identify the electrical location of the \nsource of power to be delivered to the \nLarge Load, if known.  If the source of the \npower is not known, a system purchase \nwill be assumed.  Nothing in this \nInterconnection Request constitutes a \nrequest for transmission service (see LLIP \nSection 3.2.2)."},{"page":400,"startToken":147162,"endToken":147437,"text":"35 \n \nLoad Customer has local permits and regulatory approvals for development of the Large Load, \nconsistent with Section 10A.2.1(f) of the TO Tariff. \n \nVIII. Co-Located Generation \n \nWill the Large Load be co-located with a \ngenerating facility? (Yes/No) \n \nWill the generating facility export to the \nISO Controlled Grid? (Yes/No) \n \nGenerating facility queue number or, if \nexecuted, identification of its generator \ninterconnection agreement \n \nGenerating facility nameplate capacity \n(MW) \n \n \nIX. \nSingle-Line Diagram and Modeling Information \n \nPlease attach a single-line diagram of the Large Load and the Large Load Interconnection \nCustomer’s Interconnection Facilities and/or KMZ files to this Interconnection Request.  Please \nprovide power flow modeling files (PSS/E or PSLF format preferred) or spreadsheet format \ncontaining modeling data such as impedances and ratings of customer-owned equipment. Also \nprovide short-circuit modeling data, dynamic and electromagnetic transient (EMT) models, load \ncharacteristics (including ride-through capability, ramp rates, and harmonic characteristics), any \nother details to be taken into consideration in the Interconnection Studies, and the completed \ntechnical data form in the form of Appendix A to this Attachment 1. \n \nX. \nRequired Submittals (LLIP Section 4.2.1) \nItem \nIncluded (Yes/No) \nInterconnection Study Deposit of $250,000 \n \nCommercial Readiness Deposit equal to \ntwo times the Interconnection Study \nDeposit, in a form permitted by LLIP \nSection 4.7.1 \n \nDemonstration of Site Control \n \nCompleted technical data form in the form \nof Appendix A to this Attachment 1 (TO \nTariff Section 10A.2.1(j)) \n \nCopy of this Interconnection Request sent \nto the ISO \n \n \nXI. \nAcknowledgment \n \nBy submission of this Interconnection Request, the Large Load Interconnection Customer \nacknowledges that additional detail may be required to satisfactorily perform the Interconnection"},{"page":401,"startToken":147437,"endToken":147506,"text":"36 \n \nStudies related to this Interconnection Request and agrees to work with DesertLink, LLC in good \nfaith to provide additional information as necessary.  The Large Load Interconnection Customer \nmay designate information in this Interconnection Request, including the identity of the Large \nLoad Customer, as Confidential Information in accordance with LLIP Section 7.1. \n \nInterconnection Request Submitted By: \n \n \n \n \n \n \n \n \n \nInterconnection Request Received By DesertLink, LLC: \n \n \n \n \n \n \n \n \n \nPrinted Name: \n \nDate: \n \n \nPrinted Name: \n \nDate:"},{"page":402,"startToken":147506,"endToken":147519,"text":"Attachment 3 \n \nDirect Testimony of Patrick Hayes (Exhibit No. DLK-100) and \nSupporting Exhibits"},{"page":403,"startToken":147519,"endToken":147561,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \nDesertLink, LLC \nCalifornia Independent System Operator Corporation \n) \n) \nDocket No. \nDocket No. \nER27-___-000 \nEL26-71-___ \n \n \n \n \n \nDIRECT TESTIMONY \nOF \nPATRICK HAYES \n \n \nON BEHALF OF  \nDESERTLINK, LLC \n \n \n \n \n \nLarge Load Network Upgrade Cost Recovery \n \n \n \n \n \n \n \n \nNovember 2026"},{"page":404,"startToken":147561,"endToken":147601,"text":"DIRECT TESTIMONY OF PATRICK HAYES \n \nTABLE OF CONTENTS \n \nI. \nINTRODUCTION AND EXPERIENCE ................................................................................ 1 \nII. PURPOSE AND SCOPE OF TESTIMONY .......................................................................... 2 \nIII. FERC SHOW CAUSE ORDERS............................................................................................ 3 \nIV. CAISO STAKEHOLDER PROCESS ..................................................................................... 6 \nV. COST RECOVERY AGREEMENT ....................................................................................... 8 \nVI. TARIFF REVISIONS............................................................................................................ 16"},{"page":405,"startToken":147601,"endToken":147623,"text":"EXHIBITS TO \nDIRECT TESTIMONY OF PATRICK HAYES \n \n \nExhibit No. \nDescription \n \nDLK-101: \nDLK-102: \nDLK-103:  \n \n \n \nIllustrative MTRC Calculation \nExample Reconciliation Statement \nExample Invoice Statement"},{"page":406,"startToken":147623,"endToken":147823,"text":"Page 1 \n \nDIRECT TESTIMONY OF \n \nPATRICK HAYES \n \n \nI. \nINTRODUCTION AND EXPERIENCE \nQ. \nPLEASE STATE YOUR NAME AND BUSINESS ADDRESS. \n1 \nA. \nMy name is Patrick Hayes. My business address is 16150 Main Circle Drive, Suite 310, \n2 \nChesterfield, Missouri 63017. \n3 \nQ. \nBY WHOM ARE YOU EMPLOYED, AND WHAT ARE YOUR \n4 \nRESPONSIBILITIES? \n5 \nA. \nI am employed by LS Power and serve as Associate Vice President, Transmission \n6 \nRegulatory. I lead regulatory strategy for LS Power’s transmission business across the \n7 \nCalifornia Independent System Operator (“CAISO”), Midcontinent Independent System \n8 \nOperator, PJM Interconnection, New York Independent System Operator, and other \n9 \nregional markets. My responsibilities include Federal Energy Regulatory Commission \n10 \n(“FERC”) policy, regional transmission planning, competitive transmission development, \n11 \ncost allocation and recovery, tariff development, and large-load interconnection. \n12 \nQ. \nPLEASE SUMMARIZE YOUR PROFESSIONAL EXPERIENCE AND \n13 \nEDUCATION. \n14 \nA. \nI previously served as LS Power’s Director of Transmission Business Development and \n15 \nManager of Transmission Policy. Earlier in my career, I held transmission policy, energy \n16 \ntrading, and asset optimization positions with Ameren. My experience includes developing \n17 \nstrategies for competitive transmission projects and utility partnerships, negotiating \n18 \ncommercial and ownership arrangements, evaluating transmission investments, and \n19"},{"page":407,"startToken":147823,"endToken":148087,"text":"Page 2 \n \ncoordinating multidisciplinary teams. I received a Bachelor of Science in Accounting from \n1 \nthe University of Missouri. \n2 \nQ. \nON WHOSE BEHALF ARE YOU SUBMITTING THIS TESTIMONY? \n3 \nA. \nI am testifying on behalf of DesertLink, LLC (“DesertLink”). DesertLink is a Participating \n4 \nTransmission Owner (“PTO”) selected by the California Independent System Operator \n5 \nCorporation (“CAISO”) in 2016 through its Order No. 1000 compliant Transmission \n6 \nPlanning Process to implement DesertLink’s Harry Allen to Eldorado 500 kV Transmission \n7 \nLine Project.1 DesertLink placed the project in service in August 2020. \n8 \nII. \nPURPOSE AND SCOPE OF TESTIMONY \n9 \nQ.  \nWHAT IS THE PURPOSE OF YOUR TESTIMONY? \n10 \nA. \nThe purpose of this testimony is to provide relevant context and details regarding \n11 \nDesertLink’s proposed approach to addressing the large-load cost recovery concerns \n12 \nidentified in FERC’s show cause orders. I describe the proposed Large Load Cost \n13 \nRecovery Agreement (“CRA”) and associated tariff framework, and explain how these \n14 \nmeasures assign cost responsibility for large-load-driven transmission upgrades, mitigate \n15 \ncost shifting and stranded-asset risk, avoid double recovery, and promote transparency.  \n16 \nThe CRA calculates a Minimum Transmission Revenue Contribution (\"MTRC\") under \n17 \nits Schedule 5, separately from DesertLink’s Formula Rate. DesertLink continues to \n18 \nrecover its formula-rate revenue requirement through the Transmission Access Charge \n19 \n(\"TAC\"), with credits under the CRA flowing to transmission customers through the \n20 \nTransmission Revenue Balancing Account Adjustment (\"TRBAA\"). \n21 \n \n1 See Harry Allen-Eldorado 500 kV Transmission Line Project: Project Sponsor Selection Report (Jan. 11, 2016), \navailable at http://www.caiso.com/Documents/HarryAllentoEldoradoTransmissionLine-\nProjectSponsorSelectionReport.pdf."},{"page":408,"startToken":148087,"endToken":148344,"text":"Page 3 \n \nQ.  \nARE YOU SPONSORING ANY EXHIBITS IN SUPPORT OF YOUR \n1 \nTESTIMONY IN THIS CASE? \n2 \nA.  \nYes. I am sponsoring the following exhibits: \n3 \nExhibit No. \nDescription \n \nDLK-101: \nDLK-102: \nDLK-103:  \n \n \nIllustrative MTRC Calculation \nExample Reconciliation Statement \nExample Invoice Statement \n \n \nIII. \nFERC SHOW CAUSE ORDERS \n4 \nQ.  \nPLEASE DESCRIBE FERC’S SHOW CAUSE ORDERS. \n5 \nA.  \nOn June 18, 2026, the FERC instituted show cause proceedings under section 206 of the \n6 \nFederal Power Act through six show cause orders addressing the integration of large and \n7 \nco-located loads onto the interstate transmission system. Each order is directed to an \n8 \nIndependent System Operator or Regional Transmission Organization (\"ISO/RTO\") and, \n9 \nwhere applicable, its transmission-owning members.2 The orders arise from the \n10 \nCommission's preliminary finding that the existing tariffs on file with the Commission \n11 \nappear to be unjust, unreasonable, or unduly discriminatory or preferential because they \n12 \nlack sufficiently clear and consistent provisions to address the unique challenges posed \n13 \nby the rapid growth of large loads (such as data centers) and co-location arrangements \n14 \nbetween loads and generating facilities.3 \n15 \nEach respondent is directed, within 60 days of the date of the order, to either (1) show \n16 \ncause why its tariff remains just and reasonable and not unduly discriminatory or \n17 \npreferential without the provisions identified by the Commission, or (2) explain what \n18 \n \n2 Cal. Indep. Sys. Op. Corp., 195 FERC ¶ 61,214 (2026) (relevant CAISO Show Cause Order) (“Show Cause \nOrder”). \n3 Show Cause Order at P 38."},{"page":409,"startToken":148344,"endToken":148639,"text":"Page 4 \n \ntariff changes would remedy the identified concerns if the Commission were to determine \n1 \nthat the tariff is unjust and unreasonable and proceeds to establish a replacement tariff.4 \n2 \nAs relevant here, the show cause order directed to CAISO and its Participating \n3 \nTransmission Owners (the “Show Cause Order”) required respondents to show cause or \n4 \npropose remedial tariff revisions to (1) ensure transparency concerning the network \n5 \nupgrade costs to provide transmission service to Eligible Customers on behalf of large \n6 \nloads, (2) establish a pro forma cost recovery agreement to mitigate the risk of cost \n7 \nshifting among transmission customers, and (3) ensure such payments are appropriately \n8 \ncredited toward transmission owners' transmission revenue requirements consistent with \n9 \nthe Commission's cost-of-service regulations.5 \n10 \nQ.  \nDID FERC PROVIDE ANY ADDITIONAL GUIDANCE ON HOW THE COST \n11 \nRECOVERY ASPECTS SHOULD BE ADDRESSED BY RESPONDENTS? \n12 \nA.  \nYes, Commissioners Chang and See each issued separate concurrences providing \n13 \nadditional guidance on how cost recovery for large-load-driven transmission costs should \n14 \nbe approached. Commissioner Chang supported the Commission's two-part preliminary \n15 \nsolution — public posting of information on new large loads, associated network \n16 \nupgrades identified in local transmission planning, and the costs of those upgrades, \n17 \ntogether with a pro forma cost recovery agreement to help ensure that Eligible Customers \n18 \nserving large loads bear the risk and are ultimately responsible for the costs incurred to \n19 \nprovide transmission service — as a necessary step to protect wholesale customers \n20 \nagainst unjustified cost shifts.6 Commissioner Chang also cautioned that bilateral \n21 \nagreements that simply provide transmission revenue contributions \"untethered from any \n22 \n \n4 Id. at Ordering Para. B. \n5 Id. at P 3. \n6 Show Cause Order, Comm’n. Chang Concurrence at PP 6-9."},{"page":410,"startToken":148639,"endToken":148934,"text":"Page 5 \n \nassessment of the actual cost of providing transmission service induced by individual \n1 \nlarge loads\" may be insufficient to protect other customers against unjustified cost shifts.7 \n2 \nShe urged that the resulting regulatory and rate design not be limited to a pre-defined \n3 \nsolution set, encouraging parties to submit comprehensive records outlining various and \n4 \ninnovative approaches to customer protection, including but not limited to the Ratepayer \n5 \nProtection Pledge.8 \n6 \nCommissioner See likewise described the Commission's findings on cost recovery \n7 \nagreements between transmission owners and Eligible Customers as \"an important step in \n8 \nmitigating the risks of stranded assets if large loads prove speculative,\" and she \n9 \nhighlighted the Commission's decision to reduce unnecessary redundancy by allowing an \n10 \nEligible Customer to satisfy its financial security requirement by relying on credit support \n11 \nor other financial security that a large load customer may have posted under a retail \n12 \nagreement.9 She signaled that, as the Commission gains more experience, further \n13 \nstreamlining may be appropriate — suggesting, for example, that a cost recovery \n14 \nagreement between a transmission owner and a large load customer itself could \n15 \npotentially satisfy an Eligible Customer's financial security requirement — and stated that \n16 \nshe would be looking to ensure cost recovery agreements contain \"fair and transparent \n17 \nmeasures to ensure the right costs get on the right bills.\"10 More broadly, Commissioner \n18 \nSee reaffirmed the Commission's policy of rolling most network upgrade costs — \n19 \nincluding those driven by large loads — into the embedded-cost rate paid by transmission \n20 \ncustomers, but conditioned that approach on a commitment to evaluating alternative \n21 \n \n7 Id. at P 8. \n8  Id. at PP 8-9. \n9 Show Cause Order, Comm’n. See Concurrence at P 9. \n10 Id."},{"page":411,"startToken":148934,"endToken":149180,"text":"Page 6 \n \ntransmission technologies and other tools (including alternative cost allocation structures, \n1 \ngreater clarity in transmission service agreements, accounting for state large-load-specific \n2 \ntariffs, and direct assignment in appropriate cases) that can keep costs at a responsible \n3 \nand accountable level and ensure retail consumers do not bear costs incommensurate with \n4 \nthe benefits they receive.11 \n5 \nIV. \nCAISO STAKEHOLDER PROCESS \n6 \nQ.  \nPLEASE DESCRIBE THE CAISO PROCESS FOLLOWING THE ISSUANCE OF \n7 \nTHE SHOW CAUSE ORDERS. \n8 \nA.  \nCAISO convened joint coordination meetings with the California Participating \n9 \nTransmission Owners to address the Show Cause Order and CAISO’s proposed \n10 \nimplementation framework. DesertLink participated in the joint coordination process \n11 \nmeetings on July 1, July 10, July 23, and July 28; August 4, August 11, August 18, and \n12 \nAugust 25; September 1, September 8, September 10, September 15, and September 22; \n13 \nand October 23, 2026. \n14 \nThe meetings addressed applications and studies, operational requirements, cost-shift \n15 \nprevention, flexible interconnection service options, and co-located resources. The \n16 \nmeetings provided an opportunity to examine the respective roles and responsibilities of \n17 \nCAISO and load-serving, non-load-serving, and affected PTOs. \n18 \nDesertLink also participated in CAISO’s public stakeholder meetings on August 19, \n19 \nOctober 1, and October 19, 2026, and submitted written comments on CAISO’s Straw \n20 \nProposal, Draft Final Proposal, and Draft Tariff Language. Those comments asked \n21 \nCAISO to recognize non-load-serving and affected PTOs expressly, preserve a \n22 \n \n11 Id. at P 9."},{"page":412,"startToken":149180,"endToken":149442,"text":"Page 7 \n \nmeaningful role for those PTOs in the interconnection and study process, and address \n1 \ncoordination and cost recovery. \n2 \nQ.  \nWHAT WAS DESERTLINK’S ROLE IN THIS PROCESS? \n3 \nA.  \nDesertLink coordinated with CAISO and other California PTOs. DesertLink is a non-\n4 \nload-serving PTO that neither serves retail load nor has a retail relationship with a \n5 \ncustomer seeking a large-load interconnection. DesertLink’s coordination efforts \n6 \nhighlighted the need to ensure that an affected PTO has a meaningful role in the process \n7 \neven when the affected PTO does not provide retail service to the requesting load. \n8 \nFrom July through September 2026, DesertLink participated in additional meetings with \n9 \nnon-load-serving PTOs and the broader California PTO group. The discussions addressed \n10 \nparticipation in the application and study process, access to information, technical \n11 \ncoordination, timing, and allocation and recovery of costs. The coordination supported \n12 \nthe development of positions reflecting the circumstances of non-load-serving PTOs for \n13 \nconsideration by the broader PTO group. \n14 \nDesertLink also met with Pacific Gas and Electric Company (\"PG&E\") in August 2026 \n15 \nto discuss notice, information sharing, technical consultation, and coordination when a \n16 \nlarge-load request affects a non-load-serving PTO’s facilities.  \n17 \nDesertLink emphasized the distinct roles of load-serving, non-load-serving, and affected \n18 \nPTOs throughout the process. \n19 \nFrom October through November 2026, DesertLink participated in joint cost-recovery \n20 \nmeetings with load-serving PTOs to examine potential approaches and implementation \n21 \nconsiderations. DesertLink explained the circumstances of non-load-serving and affected \n22 \nPTOs and discussed potential approaches to large-load interconnection and cost recovery. \n23"},{"page":413,"startToken":149442,"endToken":149701,"text":"Page 8 \n \nThe coordination provided an opportunity to evaluate different approaches and identify \n1 \nimplementation considerations relevant to non-load-serving PTOs. DesertLink’s proposal \n2 \nreflects consideration of those discussions and addresses the interconnection, cost-\n3 \nrecovery, and financial-security requirements associated with large loads affecting \n4 \nDesertLink’s facilities. \n5 \nQ.  \nBASED ON THIS PROCESS, WHAT IS DESERTLINK’S PROPOSED \n6 \nAPPROACH? \n7 \nA.  \nDesertLink proposes a large-load interconnection framework under Section 10A and \n8 \nAppendix VI of DesertLink’s Transmission Owner Tariff (\"TO Tariff\"), together with the \n9 \npro forma CRA in Appendix V. The interconnection framework addresses applications, \n10 \nstudies, interim service, and interconnection agreements. The CRA establishes the \n11 \nEligible Customer’s minimum revenue contribution and related security obligations for \n12 \nthe Covered Upgrades, with credits to transmission customers through the TRBAA. \n13 \nV. \nCOST RECOVERY AGREEMENT \n14 \nQ.  \nPLEASE DESCRIBE THE CRA. \n15 \nA.  \nThe CRA is a pro forma contract between DesertLink, as Transmission Owner, and the \n16 \nEligible Customer taking wholesale transmission service under the CAISO Tariff on \n17 \nbehalf of a Large Load Customer. The Large Load Customer executes a Limited \n18 \nAcknowledgment for the information, authorization, notice, and cooperation purposes \n19 \nstated therein, including cooperation in a transition to a Successor Eligible Customer. The \n20 \nLarge Load Customer is not itself a party to the wholesale payment obligations. The CRA \n21 \nestablishes the Eligible Customer’s wholesale revenue-support and security obligations \n22 \nassociated with the Large Load Facility and the Covered Upgrades, without establishing \n23 \nor prescribing the retail rates, charges, or recovery arrangements between the Eligible \n24"},{"page":414,"startToken":149701,"endToken":150000,"text":"Page 9 \n \nCustomer and the Large Load Customer. Covered Upgrades include the Large Load-\n1 \nDriven Upgrades and any DesertLink-owned CAISO-Assigned Regional Project share \n2 \nidentified in the applicable Schedules for which an Annual MTRC is established. \n3 \nAffected System Upgrades and regional project shares owned by another entity are \n4 \naddressed through separate arrangements under Sections 4.2 and 6.3.6, rather than \n5 \nincluded in DesertLink’s MTRC absent the authorization and conditions specified in the \n6 \nCRA. \n7 \nQ.  \nHOW DOES THE CRA ALIGN WITH THE COST RECOVERY PRINCIPLES \n8 \nOUTLINED IN THE SHOW CAUSE ORDER? \n9 \nA.  \nAt a high level, the CRA responds directly to the three cost-recovery concerns identified \n10 \nin the Show Cause Order by: (i) establishing a pro forma contract between DesertLink \n11 \nand the Eligible Customer that formalizes cost responsibility for the Covered Upgrades; \n12 \n(ii) establishing payment and security obligations designed to mitigate cost shifting to \n13 \nother transmission customers; and (iii) providing credits to transmission customers \n14 \nthrough the TRBAA to prevent duplicate recovery. The CRA does not change CAISO \n15 \ncost allocation. TRBAA Credits are passed through the TRBAA, not as Formula Rate \n16 \nrevenue credits. The revised Formula Rate Template adds Attachment 1a to identify \n17 \nCovered Upgrade plant and Attachment 12, Line 17a to remove any TRBAA Credits \n18 \notherwise reported in revenue accounts, preventing those amounts from reducing the \n19 \nFormula Rate revenue requirement and being credited twice. \n20 \nQ.  \nPLEASE DESCRIBE HOW THE CRA CALCULATES THE ELIGIBLE \n21 \nCUSTOMER'S PAYMENT OBLIGATION. \n22 \nA.  \nThe core payment mechanism is the Supplemental Minimum Transmission Revenue \n23 \nContribution (the \"Supplemental MTRC\") in Section 6.4 of the CRA. Under Section 6.3 \n24 \nand Schedule 5, DesertLink calculates a separate Annual MTRC for each Covered \n25"},{"page":415,"startToken":150000,"endToken":150293,"text":"Page 10 \n \nUpgrade over a twenty-year MTRC Term beginning on its applicable in-service date and \n1 \nending on the day immediately preceding the twentieth anniversary of that date, with \n2 \npartial Rate Years prorated. The Estimated Annual MTRC uses then-current estimated \n3 \ncapital cost. Within one year after the Covered Upgrade enters service, when actual \n4 \ncapital cost is known and all costs associated with its estimated capital cost have been \n5 \naccounted for, DesertLink establishes the Final Annual MTRC as the final incurred \n6 \ncapital cost multiplied by the Project-Specific Levelized Fixed Charge Rate calculated \n7 \nunder Schedule 5. Schedule 5 applies a fixed five-percent annual levelized-depreciation \n8 \nschedule over the twenty-year MTRC Term to calculate present-worth federal and state \n9 \nincome-tax depreciation benefits; that schedule is not a separate annual MTRC charge. \n10 \nThe allocation methodology assigns each Large Load Customer a share of the upgrade \n11 \ncosts, taking into account other large loads and any portion serving other transmission \n12 \nsystem needs or customers. That allocation percentage is applied only once in calculating \n13 \nthe customer’s Annual MTRC. \n14 \nDesertLink separately calculates Qualifying Transmission Revenues (\"QTR\") under \n15 \nSection 6.2 and Schedule 2. QTR consists of qualifying wholesale transmission revenues \n16 \nattributable to service to the Large Load Facility that reduce transmission revenues \n17 \notherwise collected from CAISO customers or directly credit DesertLink’s Net Revenue \n18 \nRequirement. Qualifying Transmission Revenues include the portion of TAC revenues \n19 \nattributable to the Large Load Facility and allocable to DesertLink, together with \n20 \nqualifying wheeling and other wholesale transmission revenues that reduce the amounts \n21 \notherwise collected from transmission customers. Each revenue amount is counted only \n22 \nonce. The Eligible Customer pays the greater of zero and the applicable Annual MTRC \n23"},{"page":416,"startToken":150293,"endToken":150613,"text":"Page 11 \n \nless QTR. Under Section 6.5, DesertLink invoices forecast Supplemental MTRC, \n1 \nincluding any prior-period true-up adjustment, in monthly installments payable within \n2 \nthirty Calendar Days after receipt. Upon initial finalization, the Final Annual MTRC \n3 \napplies back to the in-service date, with estimated charges reconciled in the next \n4 \nReconciliation Statement, provided as Ex. DLK-102 to my testimony. QTR attributable \n5 \nto a specific Covered Upgrade is applied to that upgrade; other QTR is allocated among \n6 \nCovered Upgrades then in their MTRC Terms pro rata based on their Annual MTRCs. If \n7 \nan upgrade enters service during a Rate Year without a projected Supplemental MTRC in \n8 \nthe Annual Projection, DesertLink promptly forecasts and invoices the prorated amount \n9 \nfor the remainder of that year under Section 6.5. The Invoice Statement is provided as Ex. \n10 \nDLK-103 to my testimony. \n11 \nQ.  \nWHY WAS THE SUPPLEMENTAL MTRC DESIGNED IN THIS WAY? \n12 \nA.  \nThe Annual MTRC operates as a revenue floor, not an additive charge. Under Section \n13 \n6.6, DesertLink serves a Reconciliation Statement, provided as Ex. DLK-102 to my \n14 \ntestimony, concurrently with each Annual Update using actual QTR and the applicable \n15 \nAnnual MTRC. The reconciliation identifies billings, receipts, Applied Security \n16 \nProceeds, the updated Cumulative Revenue Ledger, Required Operational Security, and \n17 \nthe reconciliation of forecast TRBAA credits to amounts recorded in the Transmission \n18 \nRevenue Balancing Account (\"TRBA\"). It does not annually reopen final capital cost or \n19 \nFormula Rate inputs. The Final Annual MTRC may change only as permitted by Section \n20 \n6.3.1, including correction of error or fraud, effective prospective reassignment, a final \n21 \nFERC order applicable to the calculation, or prospective changes resulting from a final \n22 \nFERC order changing DesertLink’s Formula Rate return on equity or from subsequently \n23 \nenacted tax rates or tax law. Dispute determinations are implemented under Section 11.5. \n24"},{"page":417,"startToken":150613,"endToken":150883,"text":"Page 12 \n \nWhen a permitted recalculation is made under Section 6.3.1, DesertLink updates and \n1 \nserves the MTRC Calculation Template on the Eligible Customer; the replacement \n2 \ntemplate becomes effective on service, subject to the Eligible Customer’s Article 11 \n3 \ndispute rights. \n4 \nThis design responds to Commissioner Chang’s concern about contributions untethered \n5 \nfrom the costs induced by individual large loads. The CRA ties the minimum contribution \n6 \nto the allocated capital cost and Schedule 5 inputs for identified Covered Upgrades while \n7 \nestablishing a defined twenty-year commitment. Annual reconciliation tests the revenue \n8 \nshortfall against that commitment rather than recalculating an annual Formula Rate-based \n9 \nupgrade revenue requirement. \n10 \nQ.  \nHOW DOES THE CRA ADDRESS STRANDED-ASSET RISK? \n11 \nA.  \nThe CRA addresses stranded-asset risk through a twenty-year revenue commitment, \n12 \nconstruction and operational security, and termination provisions that preserve the \n13 \nEligible Customer’s responsibility if the Large Load fails to materialize or departs the \n14 \nsystem. \n15 \nFirst, Section 6.7 establishes the Total Required Revenue Commitment for each Covered \n16 \nUpgrade as the Final Annual MTRC multiplied by twenty, subject to the adjustments \n17 \nspecified in that section. Before final determination, the projected commitment uses the \n18 \nEstimated Annual MTRC. The Remaining Cumulative Revenue Responsibility equals \n19 \nthat commitment less cumulative QTR, Supplemental MTRC Receipts, Applied Security \n20 \nProceeds, effective prospective reassignment credits, and a Termination Fee received in \n21 \nfull, without double counting. DesertLink updates an upgrade-specific Cumulative \n22 \nRevenue Ledger at least annually and includes it with each Reconciliation Statement. \n23 \nWhen a final Reconciliation Statement determines that the remaining responsibility is \n24"},{"page":418,"startToken":150883,"endToken":151180,"text":"Page 13 \n \nzero (\"Break-Even\"), operational payment and security obligations terminate. Once \n1 \nfinally satisfied, the responsibility does not revive because of later changes in Formula \n2 \nRate inputs, subject to final true-ups and correction of errors or fraud for periods before \n3 \nsatisfaction. \n4 \nSecond, Sections 3.3.4 and 3.5 provide that cancellation, downsizing, curtailment, or \n5 \ncessation after an applicable in-service date does not itself eliminate payment or security \n6 \nobligations. Upon effective termination of the CRA or permanent cessation of service \n7 \nafter that date, the Eligible Customer owes a lump-sum Termination Fee equal to the \n8 \nRemaining Cumulative Revenue Responsibility for the in-service Covered Upgrades, less \n9 \nany Supplemental MTRC billed and unpaid as of the effective termination date, due thirty \n10 \nCalendar Days after DesertLink’s invoice. The excluded unpaid Supplemental MTRC \n11 \nremains separately payable and secured; its later payment, satisfaction through Applied \n12 \nSecurity Proceeds, or direct recovery reduces the Cumulative Revenue Responsibility. \n13 \nPayment in full discharges only the remaining contractual responsibility included in the \n14 \nfee, and no further Supplemental MTRC accrues for periods after the effective \n15 \ntermination or cessation date, subject to final reconciliation for earlier periods. \n16 \nDesertLink holds each Termination Fee, together with any Operational Security proceeds \n17 \napplied to it, in a separate interest-bearing Termination Fee Account. For each Covered \n18 \nUpgrade, the Annual Termination Fee Credit for each remaining Rate Year equals the \n19 \napplicable Annual MTRC, prorated for a partial Rate Year, but may not exceed the \n20 \navailable Termination Fee Balance. In the final Rate Year of the MTRC Term, the credit \n21 \nincludes the entire remaining balance, including earnings, so the account is reduced to \n22 \nzero, subject to release and adjustment if a prospective reassignment occurs. The \n23"},{"page":419,"startToken":151180,"endToken":151456,"text":"Page 14 \n \nuncredited balance is separately accounted for as a deferred liability, is not included in \n1 \nrate base, and is not itself a TRBAA Credit. These credits do not reduce rate base. \n2 \nThird, Article 7 requires Construction Security for incurred and irrevocably committed \n3 \ncosts and Pre-In-Service Termination Costs, including applicable cancellation, \n4 \ndemobilization, and restoration costs and properly accrued allowance for funds used \n5 \nduring construction (\"AFUDC\"). Construction Security continues separately for upgrades \n6 \nnot yet in service. Operational Security must be delivered no later than thirty Calendar \n7 \nDays before the earliest expected applicable in-service date and be fully effective before \n8 \nservice. Under Section 7.3, it equals one hundred percent of the nominal Remaining \n9 \nCumulative Revenue Responsibility, reduced only by currently certified Qualifying \n10 \nRetail Security Support.  Security is recalculated at the events specified in Section 7.4, \n11 \nincluding annual projections and reconciliations, final MTRC determination, permitted \n12 \nrecalculations, reassignment, and credit review events. Security does not cap the Eligible \n13 \nCustomer’s underlying liability. For a DesertLink-owned CAISO-Assigned Regional \n14 \nProject, the CRA does not independently impose pre-service Construction Security solely \n15 \nbecause CAISO has assigned a project share; any such requirement must arise under the \n16 \napplicable tariff, interconnection agreement, or other Commission-accepted arrangement. \n17 \nTogether, these provisions protect against stranded-asset exposure through an identified \n18 \nrevenue commitment and enforceable payment and security obligations. Sections 4.2 and \n19 \n6.3.6 also require separate affected-system and third-party regional-project arrangements \n20 \nand evidence of compliance. These provisions support the Show Cause Order’s objective \n21 \nof mitigating the risk of stranded assets if large loads prove speculative. \n22"},{"page":420,"startToken":151456,"endToken":151719,"text":"Page 15 \n \nQ.  \nHOW DOES THE CRA AVOID REDUNDANT FINANCIAL SECURITY \n1 \nREQUIREMENTS? \n2 \nA.  \nSection 7.1 recognizes Construction Security provided under an interconnection or \n3 \nengineering and procurement agreement for the same costs, avoiding duplication. Under \n4 \nArticle 7 and Schedule 3, a currently effective Retail Security Certification reduces direct \n5 \nOperational Security dollar-for-dollar by certified Qualifying Retail Security Support. \n6 \nThis does not reduce the underlying wholesale obligation and does not apply to \n7 \nConstruction Security or Pre-In-Service Termination Costs. The certification remains \n8 \neffective until superseded, withdrawn, or deemed ineffective; no annual recertification is \n9 \nrequired unless an update-triggering event occurs. Direct Security may be cash, a \n10 \nqualifying Letter of Credit, or another form accepted by DesertLink in its sole discretion. \n11 \nThere is no automatic unsecured allowance for an investment-grade utility. \n12 \nSection 6.10 allows transfer to a Successor Eligible Customer through an assumption \n13 \nagreement and required Security before the prior Eligible Customer is released. Section \n14 \n6.9 permits prospective reassignment to a subsequent large load at another facility only \n15 \nwhen an objective study demonstrates reliance on identifiable incremental upgrade \n16 \ncapability that avoids or reduces otherwise-needed upgrades. The reassignment is \n17 \nbounded by the avoided upgrade cost, capability-supported amount, and remaining \n18 \nallocated net plant. A reduction becomes effective only after the service, agreement, \n19 \nsecurity, and approval conditions are satisfied, and does not reopen prior years. A sale or \n20 \ntransfer of the same Large Load Facility is governed by Section 6.10 rather than the \n21 \nreassignment study process. \n22"},{"page":421,"startToken":151719,"endToken":151995,"text":"Page 16 \n \nQ.  \nHOW DOES THE CRA HELP ENSURE THAT PAYMENTS ARE \n1 \nAPPROPRIATELY CREDITED TO TRANSMISSION CUSTOMERS? \n2 \nA.  \nSection 6.8 establishes TRBAA Credits rather than Formula Rate revenue credits. In each \n3 \nannual TRBAA, DesertLink includes as a Forecast TRBAA Credit the projected \n4 \nSupplemental MTRC for the following Rate Year, increased or reduced by any prior-\n5 \nperiod true-up adjustment, plus any Annual Termination Fee Credit scheduled for that \n6 \nyear under Section 3.3.4.  Actual Supplemental MTRC Receipts and Applied Security \n7 \nProceeds are recorded in the TRBA when received or applied, except that proceeds \n8 \napplied to a Termination Fee are credited through the Termination Fee’s annual crediting \n9 \nschedule. Differences between the forecast credit and the applicable actual amounts flow \n10 \nthrough a subsequent TRBAA. The TRBA also reflects any adjustments necessary to \n11 \nprevent duplicate recovery of amounts collected under the CRA. Each dollar is counted \n12 \nonce; QTR is not credited again, and posting, drawing, or holding Security does not itself \n13 \nproduce a credit. DesertLink maintains supporting workpapers and includes sufficient \n14 \nworkpapers with each TRBAA filing to permit verification, subject to appropriate \n15 \nconfidentiality protections. \n16 \nThis mechanism provides transmission customers the benefit of the CRA’s payments \n17 \nwithout changing the Formula Rate calculation or recovering the same amount twice. \n18 \nInterest on the TRBA balance is governed by Section 5.5 of the TO Tariff. By contrast, \n19 \nSupplemental MTRC invoices, refunds, and prior-period adjustments between \n20 \nDesertLink and the Eligible Customer do not accrue interest under Section 6.6. \n21 \nVI. \nTARIFF REVISIONS \n22 \nQ.  \nPLEASE DESCRIBE THE ASSOCIATED TARIFF REVISIONS. \n23"},{"page":422,"startToken":151995,"endToken":152292,"text":"Page 17 \n \nA.  \nThe TO Tariff establishes the Eligible Customer for Large Load (\"ECLL\") \n1 \ninterconnection framework in Section 10A, identifies the pro forma CRA as Appendix V, \n2 \nand incorporates the Large Load Interconnection Procedures (\"LLIP\"). The LLIP \n3 \naddresses the physical interconnection and study process; the CRA addresses the \n4 \nwholesale revenue-support obligations. The Formula Rate and Protocols continue to \n5 \ngovern DesertLink’s Net Revenue Requirement and rate-base treatment. Schedule 5 of \n6 \nthe CRA governs the Annual MTRC, and Section 5.5 of the TO Tariff governs the flow-\n7 \nthrough of credits through the TRBAA. CRA payments are credited through the TRBAA, \n8 \nnot as Formula Rate revenue credits. The revised Formula Rate Template adds \n9 \nAttachment 1a to identify Covered Upgrade plant and Attachment 12, Line 17a to remove \n10 \nany TRBAA Credits otherwise reported in revenue accounts, preventing duplicate \n11 \ncrediting. \n12 \nQ.  \nPLEASE DESCRIBE THE REVISIONS TO THE TO TARIFF. \n13 \nA.  \nThe principal changes establish definitions for Large Load, Co-Located Large Load, \n14 \nECLL, ECLL Interconnection, Firm Interconnection Service, Flexible Interim Load \n15 \nInterconnection (\"FILI\") Service, Interim Firm Interconnection Service, Point of \n16 \nWithdrawal, Site Control, and CRA. A Large Load is an End-User at a single site behind \n17 \none or more Points of Withdrawal with peak load of 50 MW or greater. An ECLL is a \n18 \nUtility Distribution Company (\"UDC\") or Metered Subsystem (\"MSS\") providing retail \n19 \ntransmission and interconnection service to Large Load End-Users in the CAISO \n20 \nBalancing Authority Area. Section 10A addresses ECLL applications, studies, \n21 \nagreements, interim service, and co-located loads, and Section 10A.3 directs that the \n22 \nstudy and agreement process be conducted under Appendix VI. Section 10 remains the \n23 \nTransmission System Wholesale Load (\"TSWL\") interconnection process. Related \n24"},{"page":423,"startToken":152292,"endToken":152599,"text":"Page 18 \n \nrevisions address eligibility, interconnection obligations, creditworthiness, disputes, and \n1 \nTRBAA credits. Section 10A and the LLIP apply when DesertLink is the lead \n2 \nParticipating TO; otherwise, the lead Participating TO’s corresponding tariff provisions \n3 \ngovern, with notice to DesertLink. \n4 \nQ.  \nHOW DO THE TO TARIFF REVISIONS ADDRESS THE SHOW CAUSE \n5 \nORDER'S CONCERN THAT EXISTING TARIFFS LACK CLEAR AND \n6 \nCONSISTENT PROVISIONS FOR LARGE LOADS? \n7 \nA.  \nThe proposed framework establishes an ECLL interconnection process under Section \n8 \n10A and the LLIP. The LLIP applies to new Large Loads, capacity increases to Large \n9 \nLoads previously processed under the LLIP, and increases of 50 MW or greater to \n10 \nexisting loads not previously processed under the LLIP. It applies to completed \n11 \nInterconnection Requests submitted after Appendix VI becomes effective. Under LLIP \n12 \nSection 1.2, the Interconnection Request, studies, and Large Load Interconnection \n13 \nAgreement serve as the ECLL application, study process, and ECLL Agreement for \n14 \npurposes of Section 10A. \n15 \nSection 10A.2.1 and LLIP Attachment 1 require information concerning the load ramp, \n16 \nsite, Site Control, permits and approvals, electrical configuration, related requests, and \n17 \ntechnical characteristics. LLIP Sections 4.5 and 4.6 provide for a scoping meeting, a \n18 \nLarge Load Study Process Agreement, and a Large Load Interconnection Study subject to \n19 \nISO review and concurrence. LLIP Section 4.6.1.2 establishes a ninety-Calendar-Day \n20 \nreasonable-efforts study period after execution of the study agreement or FERC \n21 \neffectiveness of an unexecuted agreement. LLIP Sections 4.6.2 and 4.6.2.1, together with \n22 \nTO Tariff Section 10A.4, provide an optional study and agreement process for Interim \n23 \nFirm Interconnection Service and FILI Service before completion of required facilities. \n24 \nFILI Service is subject to operating limits and curtailment, including during normal \n25"},{"page":424,"startToken":152599,"endToken":152877,"text":"Page 19 \n \noperating conditions, and is curtailed before Firm Interconnection Service. Its maximum \n1 \nstudied availability does not guarantee availability under actual operating conditions. \n2 \nQ.  \nHOW DO THE TO TARIFF REVISIONS IMPLEMENT THE CRA REQUIRED \n3 \nBY THE SHOW CAUSE ORDER? \n4 \nA.  \nThe proposed pro forma CRA is identified as Appendix V to the TO Tariff. TO Tariff \n5 \nSections 10.9, 10A.3.9, and 10A.6  and LLIP Section 5.3 require an applicant, where \n6 \nDesertLink requires a CRA, to execute it or request its filing unexecuted within the \n7 \napplicable interconnection-agreement execution period. The ECLL Agreement will be \n8 \ndeveloped by DesertLink consistent with the TO Tariff. The CRA establishes the Eligible \n9 \nCustomer’s payment and security obligations for Covered Upgrades, while the \n10 \ninterconnection agreement addresses physical facilities and related responsibilities. Under \n11 \nArticle 5 of the CRA, a conforming, executed agreement with populated Schedules \n12 \ngenerally will not require an individual Section 205 filing once the pro forma is accepted; \n13 \nunexecuted agreements, material deviations, and other agreements required by \n14 \nCommission rule or order must be filed. \n15 \nQ.  \nHOW DO THE TO TARIFF REVISIONS EVALUATE ALTERNATIVE \n16 \nTRANSMISSION TECHNOLOGIES AND KEEP COSTS AT A RESPONSIBLE \n17 \nAND ACCOUNTABLE LEVEL? \n18 \nA.  \nTO Tariff Section 10A.3.7 and LLIP Section 4.6.1.1 require consideration of alternative \n19 \ntransmission technologies. The LLIP identifies dynamic line ratings, advanced power \n20 \nflow control devices, advanced conductors, and transmission switching. If traditional \n21 \nnetwork upgrades are selected, DesertLink must demonstrate why alternative \n22 \ntechnologies are not feasible or would not lower costs or provide a faster interconnection \n23 \ntimeline. \n24"},{"page":425,"startToken":152877,"endToken":153187,"text":"Page 20 \n \nThe LLIP also establishes financial readiness requirements. Section 4.2.1 requires a \n1 \n$250,000 Interconnection Study Deposit and an initial Commercial Readiness Deposit \n2 \nequal to twice that amount. Section 4.6.1.4 requires an additional Commercial Readiness \n3 \nDeposit sufficient to bring the aggregate deposit to twenty percent of the Participating \n4 \nTO’s then-current estimated construction cost of the Large Load Network Upgrades \n5 \nidentified in the final Large Load Interconnection Study report and attributable to the \n6 \nInterconnection Request. The additional deposit is due within thirty Calendar Days after \n7 \nthe Large Load Interconnection Customer receives that report. If the final report is \n8 \nrevised following ISO review, the deposit is adjusted to reflect twenty percent of the \n9 \ncorresponding estimated construction cost in the revised final report, with any required \n10 \nincrease due within thirty Calendar Days after issuance of that report.  Study costs are \n11 \nreconciled to actual costs, and Sections 3.10 and 3.10.1 establish withdrawal penalties \n12 \nand exceptions. Under Section 3.10.1, a Commercial Readiness Deposit or \n13 \nInterconnection Financial Security provided for the same costs counts toward, and is not \n14 \nduplicated by, the Construction Security required under the CRA; a Withdrawal Penalty \n15 \npaid for a Large Load Network Upgrade is credited against the Pre-In-Service \n16 \nTermination Costs for that upgrade. Section 4.6.4 assigns financing of the Participating \n17 \nTO’s Interconnection Facilities solely to the Large Load Interconnection Customer and \n18 \nfinancing of Large Load Network Upgrades to DesertLink under the interconnection \n19 \nagreement and, where required, the CRA. Facilities directly assigned and paid for under \n20 \nan interconnection agreement and excluded from DesertLink’s rate base are excluded \n21 \nfrom Large Load-Driven Upgrades under the CRA. \n22 \nQ.  \nHOW DOES THE CRA INTERACT WITH THE FORMULA RATE AND \n23 \nPROTOCOLS? \n24"},{"page":426,"startToken":153187,"endToken":153473,"text":"Page 21 \n \nA.  \nUnder Sections 6.1 and 12.3, the Formula Rate and Protocols continue to govern the \n1 \ncalculation, information exchange, and true-up of DesertLink’s Net Revenue \n2 \nRequirement and the rate-base treatment of Covered Upgrades. The CRA preserves \n3 \nDesertLink's recovery of eligible transmission upgrade costs through its Formula Rate \n4 \nand does not require the Eligible Customer to reimburse DesertLink directly for the \n5 \ncapital costs of those upgrades. Instead, the CRA establishes a minimum transmission \n6 \nrevenue commitment, with Supplemental MTRC payments credited to transmission \n7 \ncustomers through the TRBAA mechanism. \n8 \nSchedule 5, rather than a new Formula Rate calculation, controls the Estimated Annual \n9 \nMTRC and Final Annual MTRC. The CRA controls Supplemental MTRC, the \n10 \nCumulative Revenue Responsibility, Operational Security, and prospective reassignment. \n11 \nWith each Annual Projection, Section 6.5 requires upgrade-specific workpapers showing \n12 \nthe Annual MTRC, forecast QTR, projected Supplemental MTRC, prior-period true-up \n13 \nadjustment, Forecast TRBAA Credit, Total Required Revenue Commitment, and \n14 \nRequired Operational Security. With each Annual Update, Sections 6.6 and 6.7 require \n15 \nservice of the Reconciliation Statement, updated Cumulative Revenue Ledger, \n16 \nrecalculated security, TRBA reconciliation, and supporting workpapers. \n17 \nSection 6.8 governs credits through the TRBAA, and Article 11 governs disputes arising \n18 \nunder the CRA. The Annual MTRC and related contractual obligations are administered \n19 \nunder the CRA separately from the Formula Rate calculation. \n20 \nQ.  \nHOW DOES THE CRA ADDRESS ANNUAL TRUE-UPS AND FINALITY? \n21 \nA.  \nSection 6.6 carries an under-billed or over-billed Supplemental MTRC amount into \n22 \nbilling following the next Annual Projection. If no further Supplemental MTRC will be \n23 \ninvoiced, DesertLink separately invoices an under-billed amount, payable within thirty \n24"},{"page":427,"startToken":153473,"endToken":153747,"text":"Page 22 \n \nCalendar Days after receipt, or refunds an over-billed amount within thirty Calendar \n1 \nDays after service of the Reconciliation Statement. These adjustments between the \n2 \nParties bear no interest. The Reconciliation Statement becomes final upon written \n3 \nacceptance or ninety Calendar Days after service, whichever occurs first, unless a timely \n4 \nNotice of Dispute identifies disputed items. Undisputed portions become final on the \n5 \notherwise applicable date; disputed items become final upon the applicable Dispute \n6 \nDetermination. \n7 \nUnder Section 11.5, DesertLink implements a final Dispute Determination by updating \n8 \nthe affected calculations, Schedules, ledger, reconciliation, and Security, as applicable, \n9 \nand invoicing or refunding amounts between the Parties within thirty Calendar Days, \n10 \nwithout interest. Any resulting adjustment affecting amounts credited to or recovered \n11 \nfrom transmission customers is recorded in the TRBA and flows through the TRBAA, \n12 \nwith interest on amounts returned to transmission customers as provided in Section 5.5 of \n13 \nthe TO Tariff. \n14 \nQ.  \nHOW DOES THE CRA SUPPORT COST AND BILLING TRANSPARENCY? \n15 \nA.  \nThe Annual Projection workpapers and annual Reconciliation Statement make the \n16 \nupgrade-specific minimum contribution, forecast and actual QTR, Supplemental MTRC, \n17 \ncumulative commitment, security, and TRBAA credit calculations available to the \n18 \nEligible Customer. Schedule 5 records the MTRC calculation and Cumulative Revenue \n19 \nLedger. Section 6.8 also requires workpapers with each TRBAA filing sufficient for \n20 \ntransmission customers to verify the credits, with aggregation or privileged treatment \n21 \navailable to protect customer-specific information. LLIP Sections 4.6.1.2 and 4.6.1.3 \n22 \nseparately provide for study reports, supporting documentation upon request, and a \n23"},{"page":428,"startToken":153747,"endToken":153947,"text":"Page 23 \nReport Meeting addressing study results and assigned cost responsibility. LLIP Section \n1 \n4.6.2.1 provides for ISO posting of FILI Service Agreements. \n2 \nSection 6.12 provides the Eligible Customer access, upon reasonable request, to the \n3 \ninformation needed to verify the identification of upgrades and the CRA’s calculations. \n4 \nArticle 11 provides informal resolution, alternative dispute resolution, and access to \n5 \nFERC. Consistent with TO Tariff Sections 10.9, 10A.3, 10A.3.9, 10A.6, and 14, disputes \n6 \narising under a CRA are resolved under that agreement’s dispute resolution provisions. \n7 \nThe Large Load Customer and any Successor Eligible Customer may participate to the \n8 \nextent a dispute affects its obligations under the CRA or Limited Acknowledgment. \n9 \nDisputes over CAISO’s regional project designation or assignment are resolved under the \n10 \napplicable CAISO Tariff procedures. \n11 \nThe CRA’s confidentiality provisions protect customer-specific information while \n12 \npreserving verification and dispute rights. These contractual records and the TRBAA \n13 \nfiling workpapers provide a basis to trace payments and credits and test whether the same \n14 \nobligation has been counted more than once. \n15 \nQ.\nDOES THIS CONCLUDE YOUR TESTIMONY?  \n16 \nA.\nYes, it does.\n17"},{"page":429,"startToken":153947,"endToken":154019,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \n \n \n \n \nDesertLink, LLC \nCalifornia Independent System Operator Corporation \n) \n) \nDocket No. \nDocket No.  \nER27-___-000 \nEL26-71-___ \n \nVERIFICATION  \n \n \n \nI, Patrick Hayes, verify under penalty of perjury that I have read the testimony, know the \ncontents thereof, and that the facts and representations set forth therein are true to the best of my \nknowledge, information and belief. \n \n \n \n \n \n \n \n \n \n \n/s/ Patrick Hayes___________________________ \n \n \n \n \n \n \nPatrick Hayes \n \n \nDated: November 16, 2026"},{"page":430,"startToken":154019,"endToken":154024,"text":"Ex. DLK-101 \nMTRC Example (Excel)"},{"page":431,"startToken":154024,"endToken":154029,"text":"Ex. DLK-102 \n \nIllustrative Reconciliation Statement"},{"page":432,"startToken":154029,"endToken":154245,"text":"DesertLink LLC  |  Proposed unpopulated form  |  1 \nIllustrative Reconciliation Statement \nILLUSTRATIVE FORMAT; THE CRA DOES NOT REQUIRE USE OF THIS EXACT FORM. \nServe with the Annual Update. Complete by Covered Upgrade and attach customer totals and workpapers. Amounts are dollars; positive customer adjustments are charges and \nnegative adjustments are credits. \nStatement information \nEntry \nEligible Customer \n[ ] \nLarge Load Facility \n[ ] \nCRA identifier \n[ ] \nCovered Upgrade \n[ ] \nRate Year \n[ ] \nStatement identifier \n[ ] \nStatement date \n[ ] \nStatement service date \n[ ] \n \n1 Annual obligation and customer true up \nLine \nComponent \nForecast \nActual \n1 \nApplicable Annual MTRC after proration \n[ ] \n[ ] \n2 \nQualifying Transmission Revenues \n[ ] \n[ ] \n3 \nSupplemental MTRC \nmax(1 − 2, 0) \nmax(1 − 2, 0) \n \nLine \nComponent \nAmount or calculation \n4 \nTotal Supplemental MTRC billed during the Rate Year \n[ ] \n5 \nPrior-period adjustments included in line 4 \n[Signed amount as billed] \n6 \nCurrent-year Supplemental MTRC billed \nLine 4 − line 5 \n7 \nCustomer true-up to carry forward or settle \nLine 3 actual − line 6 \n8 \nPortion of line 7 already billed or refunded separately \n[Signed amount; identify transaction] \n9 \nUnimplemented customer adjustment \nLine 7 − line 8 \n \nImplementation information \nEntry \nAnnual MTRC status \n[Estimated / Final / permitted recalculation] \nFinal MTRC Determination Date \n[Date or not yet established] \nActual in-service date \n[ ] \nMTRC Term End Date \n[Day before twentieth anniversary of in-service] \nSchedule 5 calculation reference \n[ ] \nAdjustment billing Rate Year \n[ ] \nNext invoice or refund reference \n[ ]"},{"page":433,"startToken":154245,"endToken":154461,"text":"DesertLink LLC  |  Proposed unpopulated form  |  2 \n2 Collections and cumulative revenue ledger \nLine \nComponent \nAmount or calculation \n10 \nOpening unpaid Supplemental MTRC billed balance \n[ ] \n11 \nNew Supplemental MTRC billed during the period \nLine 4 \n12 \nCustomer payments applied to those billed obligations \n[Exclude Applied Security Proceeds] \n13 \nOperational Security proceeds applied to those obligations \n[ ] \n14 \nOther billing adjustments or reversals \n[Signed amount; explain] \n15 \nClosing unpaid billed balance \nLines 10 + 11 − 12 − 13 + 14 \n16 \nClosing balance per billing records \n[ ] \n17 \nBilling balance check \nLine 15 − line 16 = 0 \n \n3 Remaining cumulative responsibility \nLine \nComponent \nAmount or calculation \n18 \nOpening Remaining Cumulative Revenue Responsibility \n[ ] \n19 \nPermitted commitment changes excluding reassignment \n[Signed amount; identify authority] \n20 \nQualifying Transmission Revenues credited this period \n[Reconcile to line 2 actual and prior-year adjustments] \n21 \nSupplemental MTRC Receipts credited this period \n[Exclude Applied Security Proceeds and Termination Fee] \n22 \nApplied Security Proceeds credited this period \n[Count each dollar once] \n23 \nEffective prospective reassignment credit \n[ ] \n24 \nTermination Fee recognized upon receipt in full \n[Exclude amounts already in line 22] \n25 \nReversals of prior credits or other ledger adjustments \n[Signed amount; explain] \n26 \nClosing Remaining Cumulative Revenue Responsibility \nmax(18 + 19 − 20 − 21 − 22 − 23 − 24 + 25, 0) \n27 \nClosing responsibility per cumulative ledger \n[ ] \n28 \nCumulative ledger check \nLine 26 − line 27 = 0"},{"page":434,"startToken":154461,"endToken":154687,"text":"DesertLink LLC  |  Proposed unpopulated form  |  3 \n4 Operational security \nLine \nComponent \nAmount or calculation \n29 \nClosing nominal remaining responsibility \nLine 26 \n30 \nCurrently certified Qualifying Retail Security Support \n[ ] \n31 \nRequired direct Operational Security \nmax(line 29 − line 30, 0) \n32 \nEligible direct Operational Security available to DesertLink \n[Cash and qualifying instruments; exclude retail support] \n33 \nSecurity deficiency or potential excess \nLine 31 − line 32 \n \n5 TRBA and TRBAA reconciliation \nLine \nComponent \nAmount or calculation \n34 \nForecast TRBAA Credit for the applicable Rate Year \n[Include billed prior-period adjustments] \n35 \nSupplemental MTRC Receipts recorded in TRBA \n[ ] \n36 \nApplied Security Proceeds recorded in TRBA \n[Exclude amounts counted on another line] \n37 \nAnnual Termination Fee Credits recorded in TRBA \n[Exclude amounts already in line 36] \n38 \nDuplicate-recovery credits recorded in TRBA \n[§3.3.3(d) / §6.3.5, if applicable] \n39 \nRefunds or reversals reducing recorded credits \n[ ] \n40 \nNet actual amounts recorded in TRBA \nLines 35 + 36 + 37 + 38 − 39 \n41 \nActual credit less forecast credit \nLine 40 − line 34 \n42 \nTRBA workpaper difference on the same sign basis \n[ ] \n43 \nTRBA reconciliation check \nLine 41 − line 42 = 0 \n \n6 Service and finality \nControl \nEntry \nPrepared by \n[ ] \nReviewed by \n[ ] \nCustomer service reference \n[ ] \n90 Calendar Day dispute deadline from service \n[ ] \nWritten acceptance date if earlier \n[ ] \nDisputed items and Notice of Dispute reference \n[None or attachment] \nFinal status \n[Pending / partial / final] \nFinality date \n[ ]"},{"page":435,"startToken":154687,"endToken":154692,"text":"Ex. DLK-103 \n \nIllustrative Invoice Statement"},{"page":436,"startToken":154692,"endToken":154931,"text":"DesertLink LLC  |  Proposed unpopulated form  |  1 \nIllustrative Invoice Statement \nILLUSTRATIVE FORMAT; THE CRA DOES NOT REQUIRE USE OF THIS EXACT FORM. \nDesertLink invoices the Eligible Customer directly. Complete one upgrade calculation and attach supporting workpapers. Amounts are in dollars; positive adjustments are charges \nand negative adjustments are credits. \nStatement information \nEntry \nEligible Customer \n[ ] \nLarge Load Facility \n[ ] \nCRA identifier \n[ ] \nCovered Upgrade \n[ ] \nRate Year \n[ ] \nStatement identifier \n[ ] \nStatement date \n[ ] \nStatement service date \n[ ] \nInvoice receipt date \n[ ] \nPayment due date \n[30 Calendar Days after receipt; confirm charge provision] \n \n1 Projected Supplemental MTRC \nLine \nComponent \nAmount or calculation \n1 \nApplicable projected Annual MTRC after proration \n[ ] \n2 \nProjected Qualifying Transmission Revenues \n[ ] \n3 \nProjected Supplemental MTRC before adjustments \nmax(line 1 − line 2, 0) \n4 \nPrior-period true-up adjustment allocated to this Rate Year \n[Signed amount; zero if none] \n5 \nSupplemental MTRC scheduled for this Rate Year \nLine 3 + line 4 \n6 \nNumber of scheduled monthly installments \n[12 for full year; actual count for partial year] \n7 \nScheduled monthly installment \nLine 5 ÷ line 6 \n \n2 Current invoice \nLine \nComponent \nAmount or calculation \n8 \nCurrent billing period \n[Month and year] \n9 \nSupplemental MTRC installment for this period \n[From line 7; identify any rounding adjustment] \n10 \nOther incremental charge or credit on page 2 \nLine 17 \n11 \nPayments already applied to lines 9 and 10 \n[Exclude Applied Security Proceeds] \n12 \nOperational Security proceeds already applied to lines 9 and 10 \n[ ] \n13 \nNet current invoice amount \nLines 9 + 10 − 11 − 12"},{"page":437,"startToken":154931,"endToken":155129,"text":"DesertLink LLC  |  Proposed unpopulated form  |  2 \n3 Other incremental charge or credit \nComplete for each additional item and attach a charge detail if more than one item applies. Use only the net amount not already billed or satisfied; carry the aggregate to line 10. \nLine \nComponent \nAmount or calculation \n14 \nCharge type \n[True-up / Termination Fee / other authorized item] \n15 \nGross amount of this item \n[ ] \n16a \nLess amount of this same item previously billed \n[ ] \n16b \nLess previously unbilled amount already paid \n[ ] \n16c \nLess previously unbilled amount satisfied by security \n[Exclude any amount already included in 16b] \n17 \nNet incremental charge or credit \nLine 15 − lines 16a − 16b − 16c \n \nSupporting information \nEntry \nAuthorizing CRA provision \n[ ] \nSource Rate Year \n[ ] \nReconciliation Statement identifier \n[ ] \nSource adjustment amount \n[Signed amount] \nPortion of adjustment previously billed or refunded \n[ ] \nSupporting calculation reference \n[ ] \nTermination or cessation date if applicable \n[ ] \nUpdated cumulative ledger reference if applicable \n[ ] \n \n4 Corrections and payment instructions \nControl \nEntry \nSuperseded invoice identifier \n[Original or prior invoice ID] \nReason for correction \n[ ] \nPreviously invoiced amount \n[ ] \nCorrection to previously billed amount \n[Signed amount; identify affected invoices] \nPayment instructions \n[Verified remittance instructions or attachment] \nDesertLink contact \n[Name and contact details] \nPrepared by \n[ ] \nReviewed by \n[ ] \nDelivery recipient \n[ ] \nDelivery reference \n[ ]"},{"page":438,"startToken":155129,"endToken":155143,"text":"Attachment 4 \n \nDirect Testimony of D. Eric Arzola (Exhibit No. DLK-200) and \nSupporting Exhibits"},{"page":439,"startToken":155143,"endToken":155186,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \nDesertLink, LLC \nCalifornia Independent System Operator Corporation \n) \n) \nDocket No. \nDocket No. \nER27-___-000 \nEL26-71-___ \n \n \n \nDIRECT TESTIMONY  \nOF  \nD. ERIC ARZOLA \n \nON BEHALF OF \nDESERTLINK, LLC \n \n \n \n \nLarge Load Network Upgrade Cost Recovery \n \n \n \nNovember 2026"},{"page":440,"startToken":155186,"endToken":155243,"text":"TABLE OF CONTENTS \n \nI. \nINTRODUCTION AND EXPERIENCE ........................................................................................ 1 \nII. \nPURPOSE AND SUMMARY OF TESTIMONY ........................................................................... 2 \nIII. DESERTLINK AND FORMULA RATE BACKGROUND .......................................................... 4 \nIV. THE LARGE LOAD COST RECOVERY FRAMEWORK ........................................................... 6 \nV. \nCREDITING CRA AMOUNTS TO CUSTOMERS THROUGH THE TRBAA ......................... 10 \nVI. DESERTLINK’S PROPOSED FORMULA RATE TEMPLATE CHANGES ............................ 14 \nVII. \nNATIVE AND ILLUSTRATIVE EXHIBITS .......................................................................... 16 \nVIII. \nCONCLUSION ......................................................................................................................... 19"},{"page":441,"startToken":155243,"endToken":155280,"text":"EXHIBITS TO \nDIRECT TESTIMONY OF D. ERIC ARZOLA \n \nExhibit No. \nDescription \nDLK-201: \nClean Formula Rate Template \nDLK-202: \nMarked Formula Rate Template \nDLK-203: \nClean Formula Rate Template (Excel Format) \nDLK-204: \nIllustrative Formula Rate Template \nDLK-205: \nIllustrative TRBAA Calculation"},{"page":442,"startToken":155280,"endToken":155510,"text":"DIRECT TESTIMONY OF  \n \nD. ERIC ARZOLA \n \n \nI. \nINTRODUCTION AND EXPERIENCE \n1 \nQ. \nPLEASE STATE YOUR NAME AND BUSINESS ADDRESS. \n2 \nA. \nMy name is D. Eric Arzola. My business address is 16150 Main Circle Drive, Suite 310, \n3 \nChesterfield, Missouri 63017. \n4 \nQ. \nWITH WHAT ENTITY ARE YOU EMPLOYED? \n5 \nA. \nI am employed as the Director of Transmission Rates at LS Power Development, LLC \n6 \n(“LS Power Development”), the general partner and manager of LS Power Associates, \n7 \nL.P. (“LS Power”), which is an affiliate of DesertLink, LLC (“DesertLink” or \n8 \n“Company”). \n9 \nQ. \nON WHOSE BEHALF ARE YOU TESTIFYING IN THIS PROCEEDING? \n10 \nA. \nI am testifying on behalf of DesertLink. \n11 \nQ. \nHAVE YOU PREVIOUSLY FILED TESTIMONY BEFORE A REGULATORY \n12 \nCOMMISSION? \n13 \nA. \nYes. I have submitted testimony in Federal Energy Regulatory Commission (“FERC” or \n14 \n“Commission”) Docket Nos. ER22-221, ER23-206, ER24-264, ER24-2668, ER25-321, \n15 \nER25-2025, ER26-69, ER26-140, ER26-315, ER27-165, and ER27-482. \n16 \nQ. \nPLEASE DESCRIBE YOUR EDUCATIONAL BACKGROUND AND \n17 \nPROFESSIONAL EXPERIENCE. \n18 \nA. \nI have a Bachelor of Arts degree in Economics from Rice University in Houston, Texas, \n19 \nand a Graduate Certificate in Energy Policy and Management from Portland State \n20 \nUniversity in Portland, Oregon. I have over 22 years of experience in the energy industry, \n21 \nwith over 12 years focused on transmission cost of service rates, regulation, and strategy. \n22"},{"page":443,"startToken":155510,"endToken":155779,"text":"2 \n \nI have been employed by LS Power Development since 2020, where I am responsible for \n1 \noverseeing transmission rates for LS Power’s FERC-jurisdictional entities. Prior to \n2 \njoining LS Power, I held positions with similar responsibilities at GridLiance LLC and \n3 \nPacifiCorp. \n4 \nII. \nPURPOSE AND SUMMARY OF TESTIMONY \n5 \nQ. \nWHAT IS THE PURPOSE OF YOUR TESTIMONY? \n6 \nA. \nThe purpose of my testimony is to explain how DesertLink will recover the cost of \n7 \ntransmission facilities built to serve large loads and covered by a Large Load Cost \n8 \nRecovery Agreement (“CRA”) (such facilities, “Covered Upgrades”), and how it will \n9 \ncredit the amounts Eligible Customers pay under their CRAs to transmission customers. \n10 \nThe proposal responds to the Commission’s June 18, 2026, order in Docket No. EL26-\n11 \n71-000 (“Show Cause Order”). Specifically, my testimony (i) describes the large load \n12 \ncost recovery framework; (ii) explains how the amounts DesertLink receives under its \n13 \nCRAs will be credited to customers through DesertLink’s Transmission Revenue \n14 \nBalancing Account Adjustment (“TRBAA”), and the related revisions to DesertLink’s \n15 \nTransmission Owner Tariff (“TO Tariff”); (iii) describes the changes to DesertLink’s \n16 \nFormula Rate Template, including a new Attachment 1a; (iv) explains why no changes \n17 \nare needed to DesertLink’s Formula Rate Implementation Protocols or Appendix I of the \n18 \nTO Tariff; (v) describes the exhibits I sponsor, including two illustrative examples; and \n19 \n(vi) explains why the proposal is just and reasonable. The pro forma CRA, including how \n20 \neach Eligible Customer’s annual Minimum Transmission Revenue Contribution is \n21 \nestablished, is sponsored by DesertLink witness Mr. Hayes. \n22"},{"page":444,"startToken":155779,"endToken":156058,"text":"3 \n \nQ. \nPLEASE SUMMARIZE THE PROPOSAL. \n1 \nA. \nDesertLink proposes to credit the amounts it receives under its CRAs to transmission \n2 \ncustomers through its TRBAA, the existing mechanism DesertLink uses to pass revenue \n3 \nthat it does not receive through the California Independent System Operator Corporation \n4 \n(“CAISO”) Transmission Access Charge (“TAC”) back to customers. To implement this \n5 \nproposal, DesertLink proposes the following: \n6 \n• Revise the definition of the TRBAA and Section 5.5 of the TO Tariff so that the \n7 \nTRBAA also flows through to transmission customers the amounts a CRA \n8 \nrequires to be credited through it, including TRBAA Credits that DesertLink \n9 \nreceives directly from or on behalf of an Eligible Customer; \n10 \n• Add Attachment 1a – Project Plant Detail to the Formula Rate Template, to report \n11 \nplant and net investment separately for the Harry Allen to Eldorado 500 kV \n12 \nTransmission Project (“Harry Allen to Eldorado Project”) and each Covered \n13 \nUpgrade; \n14 \n• Use the project detail on Attachment 1a to calculate the revenue requirement of \n15 \neach project on Attachment 1 – Project Revenue Requirement Worksheet; and \n16 \n• Add a new Line 17a to Attachment 12 – Revenue Credit Detail, so that TRBAA \n17 \nCredits are not also credited in the Formula Rate. \n18 \nQ. \nDO THE REVISIONS CHANGE HOW DESERTLINK’S REVENUE \n19 \nREQUIREMENT IS CALCULATED? \n20 \nA. \nNo. The cost of service inputs, return, depreciation, taxes, and allocators are unchanged. \n21 \nCovered Upgrades are included in DesertLink’s rate base and revenue requirement in the \n22 \nsame manner as any other DesertLink transmission plant. The revisions add project-level \n23 \ndetail and ensure that TRBAA Credits are credited only once. Absent any Covered \n24"},{"page":445,"startToken":156058,"endToken":156318,"text":"4 \n \nUpgrade or CRA, the revised Formula Rate Template produces the same revenue \n1 \nrequirement as the currently effective Formula Rate Template. Once these revisions are \n2 \naccepted, entry into a CRA and receipt of amounts under it will not require any further \n3 \nmodification of the Formula Rate. \n4 \nQ. \nOTHER THAN YOUR TESTIMONY, ARE YOU SPONSORING ANY \n5 \nEXHIBITS? \n6 \nA. \nYes. I am sponsoring the following exhibits: \n7 \nExhibit No. \nDescription \nDLK-201: \nClean Formula Rate Template \nDLK-202: \nMarked Formula Rate Template \nDLK-203: \nClean Formula Rate Template (Excel Format) \nDLK-204: \nIllustrative Formula Rate Template \nDLK-205: \nIllustrative TRBAA Calculation \nIII. \nDESERTLINK AND FORMULA RATE BACKGROUND \n8 \nQ. \nPLEASE PROVIDE AN OVERVIEW OF DESERTLINK AND ITS FORMULA \n9 \nRATE. \n10 \nA. \nDesertLink is a transmission-only Participating Transmission Owner in the CAISO that \n11 \nowns the Harry Allen to Eldorado Project, which the CAISO selected DesertLink to \n12 \ndevelop through its competitive solicitation process. DesertLink’s formula rate consists \n13 \nof its Formula Rate Template (Appendix III of the TO Tariff) and its Formula Rate \n14 \nImplementation Protocols (Appendix IV of the TO Tariff) (together, the “Formula \n15 \nRate”), which were originally accepted by the Commission in Docket No. ER17-135 and \n16 \nmost recently revised in Docket No. ER26-3479. DesertLink’s revenue requirement is \n17 \nrecovered through the CAISO TAC. \n18 \nQ. \nHOW DOES THE FORMULA RATE OPERATE EACH YEAR? \n19 \nA. \nBy October 1, DesertLink posts an Annual Projection of its net revenue requirement for \n20 \nthe upcoming Rate Year. By July 1 after each Rate Year, DesertLink posts an Annual \n21"},{"page":446,"startToken":156318,"endToken":156625,"text":"5 \n \nUpdate using actual FERC Form No. 1 or other Company data. The difference between \n1 \nthe projected and actual net revenue requirement, with interest, is the True-Up \n2 \nAdjustment, which is included in a later Annual Projection. \n3 \nQ. \nHOW IS DESERTLINK’S TRANSMISSION REVENUE REQUIREMENT \n4 \nDETERMINED? \n5 \nA. \nAs provided in Appendix I of the TO Tariff, DesertLink’s Transmission Revenue \n6 \nRequirement (“TRR”) is the sum of its Base Transmission Revenue Requirement (“Base \n7 \nTRR”), determined under the Formula Rate, and its TRBAA. DesertLink files to update \n8 \nits TRBAA each October, effective January 1. Under Section 5.5 of the TO Tariff, the \n9 \nTRBAA equals the principal balance in DesertLink’s Transmission Revenue Balancing \n10 \nAccount (“TRBA”) as of September 30 (“Cr”), plus a forecast of Transmission Revenue \n11 \nCredits for the following calendar year (“Cf”), plus the interest balance for the TRBA \n12 \n(“I”). The TRBA compares DesertLink’s Base TRR to the amounts it actually receives, \n13 \nso that DesertLink collects no more and no less than its Base TRR. DesertLink already \n14 \nuses the TRBAA to credit customers with revenue it receives outside the TAC, such as \n15 \nGenerator Interconnection Process Forfeited Deposit Allocations. \n16 \nQ. \nWHY IS DESERTLINK MAKING THIS FILING? \n17 \nA. \nIn the Show Cause Order, the Commission directed the CAISO and its transmission \n18 \nowners to show cause why their tariffs remain just and reasonable or to propose changes \n19 \nfor integrating large loads. Among other things, the Commission called for a mechanism \n20 \nto ensure that large load payments are “credited toward transmission owners’ \n21 \ntransmission revenue requirements.” DesertLink’s current Formula Rate Template reports \n22 \nplant values only in total and has no means of identifying the facilities built to serve large \n23 \nloads, and its TO Tariff limits Transmission Revenue Credits to amounts received from \n24"},{"page":447,"startToken":156625,"endToken":156942,"text":"6 \n \nthe CAISO. The revisions I describe provide the mechanism the Commission called for. \n1 \nIV. \nTHE LARGE LOAD COST RECOVERY FRAMEWORK \n2 \nQ. \nWHAT IS A CRA? \n3 \nA. \nA CRA is an agreement between DesertLink and an Eligible Customer taking \n4 \ntransmission service on behalf of a large load. Under its CRA, the Eligible Customer \n5 \ncommits to an annual Minimum Transmission Revenue Contribution (“Annual MTRC”) \n6 \nfor each Covered Upgrade built to serve the large load, for a fixed twenty-year term \n7 \nbeginning on the applicable in-service date, with partial Rate Years prorated as provided \n8 \nin the CRA. The pro forma CRA is set forth in Appendix V of the TO Tariff. The Annual \n9 \nMTRC is calculated solely under the MTRC Calculation Template in Schedule 5 of the \n10 \nCRA and is not an input to, or a calculation made under, the Formula Rate. The terms of \n11 \nthe pro forma CRA, including how the Annual MTRC is established, termination, and \n12 \ncredit support requirements, are described in the transmittal letter and the testimony of \n13 \nMr. Hayes. \n14 \nQ. \nHOW ARE THE COSTS OF COVERED UPGRADES RECOVERED? \n15 \nA. \nEach Covered Upgrade placed under the CAISO’s Operational Control is included in \n16 \nDesertLink’s rate base and Base TRR and recovered through the CAISO TAC together \n17 \nwith the cost of the Harry Allen to Eldorado Project. The Eligible Customer pays the \n18 \nTAC for the service it takes, like any other transmission customer. The portion of those \n19 \nTAC payments allocable to DesertLink, determined under Schedule 2 of the CRA, counts \n20 \ntoward the Eligible Customer’s Annual MTRC as “Qualifying Transmission Revenues.” \n21 \nUnder Section 6.2, Qualifying Transmission Revenues also include qualifying wheeling \n22 \nand other wholesale transmission revenues attributable to service to the Large Load \n23 \nFacility, to the extent they reduce transmission revenues otherwise collected from CAISO \n24"},{"page":448,"startToken":156942,"endToken":157225,"text":"7 \n \ncustomers or directly credit DesertLink’s Net Revenue Requirement, without duplicate \n1 \nrecognition. \n2 \nQ. \nWHAT IS THE SUPPLEMENTAL MTRC? \n3 \nA. \nThe Supplemental MTRC is calculated separately for each Covered Upgrade as the \n4 \namount, if any, by which the applicable Annual MTRC, prorated for a partial Rate Year, \n5 \nexceeds the Qualifying Transmission Revenues allocated to that upgrade under Section \n6 \n6.4. It ensures that the Eligible Customer pays at least its committed Annual MTRC each \n7 \nyear, even if its load develops more slowly than expected. The Supplemental MTRC is \n8 \nnever less than zero. \n9 \nQ. \nHOW IS THE SUPPLEMENTAL MTRC BILLED AND RECONCILED? \n10 \nA. \nThe Supplemental MTRC follows the same calendar as the Formula Rate. With each \n11 \nAnnual Projection, DesertLink forecasts the Eligible Customer’s Qualifying \n12 \nTransmission Revenues and resulting Supplemental MTRC for the Rate Year and \n13 \ninvoices that amount, increased or reduced by any prior-period true-up adjustment, to the \n14 \nEligible Customer in equal monthly installments. In connection with each Annual \n15 \nUpdate, DesertLink determines the actual Supplemental MTRC using actual Qualifying \n16 \nTransmission Revenues and serves the Eligible Customer a Reconciliation Statement. \n17 \nThe difference between the Supplemental MTRC billed for a Rate Year, excluding any \n18 \nprior-period true-up adjustment included in that billing, and the actual Supplemental \n19 \nMTRC for that Rate Year is a prior-period true-up adjustment, which increases or reduces \n20 \nthe Supplemental MTRC invoiced following the next Annual Projection. The adjustment \n21 \nis invoiced or refunded separately only if no further Supplemental MTRC will be \n22 \ninvoiced. No interest accrues on the Supplemental MTRC or on any prior-period true-up \n23 \nadjustment between DesertLink and the Eligible Customer. \n24"},{"page":449,"startToken":157225,"endToken":157537,"text":"8 \n \nQ. \nWHAT HAPPENS IF AN ELIGIBLE CUSTOMER DOES NOT PAY OR \n1 \nTERMINATES ITS CRA? \n2 \nA. \nIf an Eligible Customer does not pay, DesertLink may draw on the Eligible Customer’s \n3 \nOperational Security and apply the proceeds to the unpaid amount (“Applied Security \n4 \nProceeds”). Upon effective termination of the CRA or permanent cessation of service by \n5 \nthe Large Load Facility after the applicable in-service date, the Eligible Customer pays a \n6 \nlump-sum Termination Fee equal to the Remaining Cumulative Revenue Responsibility \n7 \nfor each in-service Covered Upgrade, less any Supplemental MTRC billed and unpaid as \n8 \nof the effective termination or cessation date. The excluded unpaid amounts remain \n9 \nseparately payable and secured; their later payment, satisfaction through Applied Security \n10 \nProceeds, or direct recovery reduces the Cumulative Revenue Responsibility. Full \n11 \npayment of the Termination Fee discharges only the responsibility included in that fee, as \n12 \nprovided in Section 3.3.4. DesertLink will hold the Termination Fee in a separately \n13 \nidentified, interest-bearing Termination Fee Account for each Covered Upgrade and \n14 \ncredit the balance, including earnings, to transmission customers through the TRBAA in \n15 \nannual amounts equal to the Annual MTRC (“Annual Termination Fee Credits”), for the \n16 \nRate Years remaining in the applicable MTRC Term, prorated for partial Rate Years, \n17 \nwith each year’s credit limited to the available balance and the final year’s credit \n18 \nincluding any remaining balance, including earnings, so that the account is reduced to \n19 \nzero, subject to the prospective reassignment and release provisions of Section 3.3.4. The \n20 \nuncredited Termination Fee Balance is separately accounted for as a deferred liability and \n21 \nis not itself a TRBAA Credit or Formula Rate input. The Covered Upgrade remains in \n22 \nrate base. The terms governing security and termination are described in the testimony of \n23 \nMr. Hayes. \n24"},{"page":450,"startToken":157537,"endToken":157824,"text":"9 \n \nQ. \nWHAT ARE TRBAA CREDITS? \n1 \nA. \nThe CRA uses the term “TRBAA Credits” for the Forecast TRBAA Credit and the \n2 \namounts DesertLink records in the TRBA and credits to transmission customers through \n3 \nthe TRBAA: payments of Supplemental MTRC received from or on behalf of the \n4 \nEligible Customer (“Supplemental MTRC Receipts”), Applied Security Proceeds, Annual \n5 \nTermination Fee Credits, and any credit required to prevent DesertLink from recovering \n6 \nthe same cost twice. The projected Supplemental MTRC, increased or reduced by any \n7 \nprior-period true-up adjustment, together with any Annual Termination Fee Credit \n8 \nscheduled for the following year, included in the TRBAA is the “Forecast TRBAA \n9 \nCredit.” Consistent with the CRA, TRBAA Credits are credited solely through the \n10 \nTRBAA and are not inputs to the Formula Rate. Qualifying Transmission Revenues are \n11 \nnot TRBAA Credits because they are already reflected in calculating the Supplemental \n12 \nMTRC. \n13 \nQ. \nHOW ARE COVERED UPGRADES TREATED FOR PURPOSES OF RETURN \n14 \nON EQUITY AND COST CONTAINMENT? \n15 \nA. \nCovered Upgrades will be subject to DesertLink’s Commission-accepted Formula Rate \n16 \nand the return on equity (“ROE”) reflected in the effective Formula Rate. DesertLink’s \n17 \ncommitment to limit its ROE to 9.8%, inclusive of incentive ROE adders, was made in \n18 \nconnection with the competitive solicitation for the Harry Allen to Eldorado Project. \n19 \nDesertLink is not proposing in this proceeding to extend that project-specific competitive \n20 \ncommitment to Covered Upgrades.  \n21 \nCovered Upgrade costs will be separately identified on Attachment 1a and reported as \n22 \n“other costs” in the commitment work paper provided under Attachment A to the \n23 \nFormula Rate Implementation Protocols. Those costs will not be subject to the Binding \n24"},{"page":451,"startToken":157824,"endToken":158148,"text":"10 \n \nCost Cap applicable to the Harry Allen to Eldorado Project.  \n1 \nDesertLink is not requesting a different ROE or any new incentive ROE adder in this \n2 \nproceeding. DesertLink retains the right, subject to applicable Commission requirements, \n3 \nto seek a different ROE or incentive treatment for Covered Upgrades in a future filing \n4 \nunder Section 205 of the Federal Power Act. Unless and until the Commission authorizes \n5 \ndifferent treatment, the ROE and any applicable incentive treatment reflected in the \n6 \neffective Formula Rate will govern. \n7 \nV. \nCREDITING CRA AMOUNTS TO CUSTOMERS THROUGH THE TRBAA \n8 \nQ. \nHOW WILL DESERTLINK CREDIT TRBAA CREDITS TO CUSTOMERS? \n9 \nA. \nThrough the TRBAA. Each October, DesertLink will include the Forecast TRBAA \n10 \nCredit for the following calendar year in Cf. Under the CRA, the Forecast TRBAA Credit \n11 \nequals the projected Supplemental MTRC, increased or reduced by any prior-period true-\n12 \nup adjustment, which is the same amount DesertLink will invoice the Eligible Customer, \n13 \nplus any Annual Termination Fee Credit scheduled for that year under Section 3.3.4. The \n14 \nForecast TRBAA Credit lowers the TRR effective January 1 and, through the TAC, the \n15 \ntransmission charges paid by all customers. During the year, the CAISO pays DesertLink \n16 \nthe lower TRR, and the Eligible Customer pays the Supplemental MTRC directly to \n17 \nDesertLink. The TRBA records both. For these CRA amounts, a TRBA difference arises \n18 \nwhen the amounts DesertLink records in the TRBA differ from the corresponding credits \n19 \nreflected in CAISO payments, for example because of late payment or non-payment, the \n20 \napplication of security, a termination, or the timing of monthly installments. Any such \n21 \ndifference is included in the September 30 TRBA balance and returned to, or recovered \n22 \nfrom, customers through Cr in the following TRBAA. Amounts later refunded or \n23 \nreversed, and adjustments resulting from the resolution of a dispute under the CRA, are \n24"},{"page":452,"startToken":158148,"endToken":158468,"text":"11 \n \nalso recorded in the TRBA. \n1 \nQ. \nWHY IS THE TRBAA THE APPROPRIATE MECHANISM? \n2 \nA. \nThere are several reasons. First, the TRBAA already exists to credit customers with \n3 \nrevenue DesertLink receives outside the TAC, and the Commission and stakeholders \n4 \nreview it each year. Second, because the Supplemental MTRC is invoiced on a forecast \n5 \nbasis, including the Forecast TRBAA Credit in Cf gives customers the credit in the TRR \n6 \neffective January 1, rather than a year later. Third, the TRBA ensures DesertLink collects \n7 \nno more and no less than its Base TRR, so DesertLink retains none of the TRBAA \n8 \nCredits. Fourth, crediting the revenue through the TRBAA keeps the full cost of each \n9 \nCovered Upgrade in the Base TRR, consistent with the CAISO’s requirement that \n10 \nfacilities under its Operational Control be included in the TRR, while the TRBAA shows \n11 \nthe credit transparently and separately. \n12 \nQ. \nDOES USING THE TRBAA LIMIT THE ABILITY OF CUSTOMERS AND \n13 \nOTHER INTERESTED PARTIES TO REVIEW OR CHALLENGE THESE \n14 \nCREDITS? \n15 \nA. \nNo. DesertLink’s annual TRBAA filing is made under Section 205 of the Federal Power \n16 \nAct. Each filing is noticed by the Commission, is open to intervention, comment, and \n17 \nprotest, and is subject to Commission review and acceptance. DesertLink will include in \n18 \neach filing the calculations, work papers, and testimony supporting the TRBAA Credits, \n19 \nso interested parties can review and challenge those amounts in that proceeding. In \n20 \naddition, the inputs to the Formula Rate Template, including the Covered Upgrade plant \n21 \nreported on Attachment 1a and the amounts removed on Attachment 12, Line 17a, are \n22 \nsubject to the existing information exchange, review, and challenge procedures of the \n23 \nFormula Rate Implementation Protocols. As a result, every amount affected by the \n24 \nproposal remains subject to review and challenge in one or both of these processes. \n25"},{"page":453,"startToken":158468,"endToken":158781,"text":"12 \n \nQ. \nWHAT CHANGES TO THE TO TARIFF ARE NEEDED TO IMPLEMENT THIS \n1 \nAPPROACH? \n2 \nA. \nSection 5.5 of the TO Tariff currently provides for the TRBAA to flow Transmission \n3 \nRevenue Credits through to transmission customers. The TO Tariff defines Transmission \n4 \nRevenue Credits as proceeds received from, and charges imposed by, the CAISO, other \n5 \nthan proceeds that recover DesertLink’s TRR through the TAC. Because CRA-related \n6 \ncredits include amounts received directly from or on behalf of the Eligible Customer and \n7 \nAnnual Termination Fee Credits scheduled under Section 3.3.4, DesertLink proposes to \n8 \nrevise the definition of the TRBAA and Section 5.5 so that the TRBAA also flows \n9 \nthrough to transmission customers all amounts a CRA requires to be credited through it. \n10 \nThe revisions add amounts recorded in the TRBA under a CRA to Cr, add any forecast \n11 \ncredit a CRA requires to Cf, and include amounts recorded in the TRBA under a CRA in \n12 \nthe TRBA principal balance used to calculate interest. The revisions also clarify that \n13 \nSection 5.5 does not require the payment of interest between DesertLink and an Eligible \n14 \nCustomer, which is governed solely by the CRA. The definition of Transmission \n15 \nRevenue Credits is unchanged. \n16 \nQ. \nHOW WILL TRBAA CREDITS BE REFLECTED IN THE ANNUAL TRBAA \n17 \nFILING? \n18 \nA. \nDesertLink will add the following lines to the TRBA and TRBAA calculation it files each \n19 \nyear, as shown in Exhibit No. DLK-205: \n20 \n• Lines 7a through 7d record Supplemental MTRC Receipts, Applied Security \n21 \nProceeds, Annual Termination Fee Credits, and duplicate-recovery credits and \n22 \nother adjustments, including reversals of amounts later refunded and adjustments \n23 \nresulting from the resolution of disputes under the CRA. Applied Security \n24 \nProceeds used to pay a Termination Fee are held in the Termination Fee Account \n25"},{"page":454,"startToken":158781,"endToken":159094,"text":"13 \n \nand credited through the Annual Termination Fee Credits on Line 7c, rather than \n1 \non Line 7b. These amounts are included in Net Payment on Line 8; and \n2 \n• Cf on Line 18 is separated into other Transmission Revenue Credits (Line 18a) \n3 \nand the Forecast TRBAA Credit (Line 18b), which equals the projected \n4 \nSupplemental MTRC for the following calendar year, increased or reduced by any \n5 \nprior-period true-up adjustment, plus any Annual Termination Fee Credit \n6 \nscheduled for that year. \n7 \nBecause TRBAA Credits are included in Net Payment, any difference between the credit \n8 \nreflected in CAISO payments and the TRBAA Credits recorded becomes part of the \n9 \nTRBA balance and accrues interest in the same manner as other TRBA balances. Absent \n10 \nTRBAA Credits, these lines are zero and the calculation is unchanged. \n11 \nQ. \nWHY DO TRBA BALANCES RELATED TO TRBAA CREDITS ACCRUE \n12 \nINTEREST WHILE PRIOR-PERIOD TRUE-UP ADJUSTMENTS DO NOT? \n13 \nA. \nInterest applies when DesertLink holds funds that belong to transmission customers, or \n14 \nwhen transmission customers hold funds owed to DesertLink. A TRBA balance created \n15 \nby a late payment, a non-payment before security is applied, or the timing of monthly \n16 \ninstallments reflects an actual over- or under-recovery by DesertLink, so it accrues \n17 \ninterest like any other TRBA balance. A prior-period true-up adjustment is different. \n18 \nWhen further Supplemental MTRC will be invoiced, the adjustment is added to the \n19 \nSupplemental MTRC invoiced for a later Rate Year and to the Forecast TRBAA Credit \n20 \nfor that same Rate Year, so the matched adjustment does not itself create an over- or \n21 \nunder-recovery by DesertLink. Differences between the credit reflected in CAISO \n22 \npayments and actual receipts or applied amounts remain subject to TRBA interest. When \n23 \nno further Supplemental MTRC will be invoiced, Section 6.6 instead requires a separate \n24"},{"page":455,"startToken":159094,"endToken":159397,"text":"14 \n \ninvoice or refund, with the receipt or refund recorded in the TRBA when received or \n1 \npaid. Consistent with Section 6.6 of the CRA and Section 5.5 of the TO Tariff, no interest \n2 \naccrues on a prior-period true-up adjustment between DesertLink and the Eligible \n3 \nCustomer; interest on any resulting TRBA balance is calculated separately. \n4 \nQ. \nWILL DESERTLINK SUPPORT THESE AMOUNTS IN EACH ANNUAL \n5 \nTRBAA FILING? \n6 \nA. \nYes. In each annual TRBAA filing, DesertLink will provide the TRBA and TRBAA \n7 \ncalculation substantially in the form of Exhibit No. DLK-205, together with work papers \n8 \nsupporting the Forecast TRBAA Credit and the TRBAA Credits recorded during the \n9 \nTRBA year, and its witness will testify to those amounts. As provided in Section 6.8 of \n10 \nthe CRA, those work papers may present customer-specific information on an aggregated \n11 \nbasis or be submitted with a request for privileged treatment under 18 C.F.R. § 388.112. \n12 \nQ. \nARE ANY CHANGES NEEDED TO APPENDIX I OF THE TO TARIFF? \n13 \nA. \nNo. Appendix I states that DesertLink’s TRR equals its Base TRR plus its TRBAA, and \n14 \nthat the TRBAA is computed in accordance with Section 5.5 of the TO Tariff and the \n15 \nCAISO Tariff. TRBAA Credits are included in the TRBAA amount stated in Appendix I \n16 \neach year, so no change to its terms is required. \n17 \nVI. \nDESERTLINK’S PROPOSED FORMULA RATE TEMPLATE CHANGES \n18 \nQ. \nWHY IS ATTACHMENT 1A NEEDED? \n19 \nA. \nThe existing Formula Rate Template calculates the revenue requirement of the Harry \n20 \nAllen to Eldorado Project using total transmission plant. To show the revenue \n21 \nrequirement of each Covered Upgrade, the Formula Rate Template must report plant for \n22 \neach project separately. Attachment 1a provides that detail. \n23"},{"page":456,"startToken":159397,"endToken":159708,"text":"15 \n \nQ. \nPLEASE DESCRIBE ATTACHMENT 1A. \n1 \nA. \nAttachment 1a has five sections, each with a line for each project. Additional project lines \n2 \nmay be added as Covered Upgrades are placed in service. \n3 \n• Section 1 reports monthly transmission gross plant in service and its 13-month \n4 \naverage. The total ties to Attachment 4, Line 14, Column (b); \n5 \n• Section 2 reports monthly transmission accumulated depreciation and its 13-\n6 \nmonth average. The total ties to Attachment 4, Line 14, Column (h); \n7 \n• Sections 3 and 4 report Construction Work in Progress (“CWIP”) and \n8 \nunamortized abandoned plant by project, which tie to Attachment 4; and \n9 \n• Section 5 calculates each project’s net plant (Line 1 – Line 2 + Line 3 + Line 4). \n10 \nThe total ties to Appendix III, page 2, Line 14 plus Lines 25 and 27. \n11 \nBecause the Attachment 1a totals tie to Attachment 4 and Appendix III, total plant and \n12 \nthe total revenue requirement are unchanged. \n13 \nQ. \nPLEASE DESCRIBE THE REVISIONS TO ATTACHMENT 1. \n14 \nA. \nEach project line on Attachment 1 now draws its project name, gross plant including \n15 \nCWIP (Column 3), net plant (Column 6), and depreciation and amortization expense \n16 \n(Column 9) from Attachment 1a. Notes D, E, and F are revised to reference Attachment \n17 \n1a. The allocation factors applied to each project are unchanged, so each project’s \n18 \nrevenue requirement reflects its share of total plant, and the project revenue requirements \n19 \nsum to the total revenue requirement on Appendix III. \n20 \nQ. \nPLEASE DESCRIBE THE REVISIONS TO ATTACHMENT 12. \n21 \nA. \nDesertLink proposes a new Line 17a, “Less: Revenue Credits included in the TRBAA,” \n22 \nand revises Line 18 to subtract it. Consistent with Section 6.8 of the CRA, TRBAA \n23 \nCredits are credited solely through the TRBAA and are not Formula Rate revenue credits. \n24"},{"page":457,"startToken":159708,"endToken":160000,"text":"16 \n \nLine 17a is a safeguard: to the extent any TRBAA Credits are recorded in the revenue \n1 \naccounts included on Line 15, Line 17a removes them, so they are credited to customers \n2 \nonce, through the TRBAA, and not also through the Formula Rate. \n3 \nQ. \nARE THERE OTHER CHANGES TO THE FORMULA RATE TEMPLATE? \n4 \nA. \nYes. Attachment 1a has been added to the Table of Contents. There are no other changes. \n5 \nQ. \nARE ANY CHANGES NEEDED TO THE FORMULA RATE \n6 \nIMPLEMENTATION PROTOCOLS? \n7 \nA. \nNo. The Formula Rate Implementation Protocols already require DesertLink to support \n8 \neach input to the Formula Rate Template that is not taken directly from the FERC Form \n9 \nNo. 1 and to explain material changes in revenue credits, which will include the amounts \n10 \non Attachment 12, Line 17a. The existing posting, review, challenge, and true-up \n11 \nprocedures apply to Attachment 1a without change. TRBAA Credits are reviewed in \n12 \nDesertLink’s annual TRBAA filing under Section 205 of the Federal Power Act, as I \n13 \ndescribed above. \n14 \nVII. \nNATIVE AND ILLUSTRATIVE EXHIBITS \n15 \nQ. \nPLEASE DESCRIBE EXHIBIT NO. DLK-203. \n16 \nA. \nExhibit No. DLK-203 is the revised Formula Rate Template in native Excel format with \n17 \nall formulas and links intact, including new Attachment 1a. It is not populated with \n18 \nDesertLink or customer data. Reviewers can enter values in the input cells and observe \n19 \nthe formula mechanics. \n20 \nQ. \nPLEASE DESCRIBE EXHIBIT NO. DLK-204. \n21 \nA. \nExhibit No. DLK-204 is the revised Formula Rate Template populated with hypothetical \n22 \ndata for the 2030 Rate Year to illustrate the treatment of a Covered Upgrade. The \n23 \nexample includes the Harry Allen to Eldorado Project and one $60 million Covered \n24"},{"page":458,"startToken":160000,"endToken":160309,"text":"17 \n \nUpgrade placed in service January 1, 2030, consistent with the illustrative CRA \n1 \nworksheet sponsored by Mr. Hayes (Exhibit No. DLK-101). In that worksheet, the \n2 \nCovered Upgrade has an Annual MTRC of $7,292,700 and projected Qualifying \n3 \nTransmission Revenues of $3,363,840, for a Supplemental MTRC of $3,928,860. In \n4 \nExhibit No. DLK-204: \n5 \n• Because the Covered Upgrade is placed in service January 1, 2030, it is not \n6 \nincluded in the December 2029 plant balance, and its 13-month average gross \n7 \nplant is $55.38 million. The Covered Upgrade’s revenue requirement on \n8 \nAttachment 1 is $7.08 million and the total Base TRR is $23.85 million; \n9 \n• TRBAA Credits of $3,928,860 are assumed to be recorded in a revenue account \n10 \nreported on Attachment 12, Line 14, and are removed on Line 17a, so they do not \n11 \nreduce the Base TRR; without Line 17a, the Base TRR would be $19.92 million \n12 \nand the amounts would be credited twice; and \n13 \n• The Covered Upgrade’s first-year Formula Rate revenue requirement of $7.08 \n14 \nmillion differs from its Annual MTRC of $7.29 million because the two are \n15 \ncalculated separately and on different bases. The Annual MTRC is calculated \n16 \nunder Schedule 5 of the CRA and, once finalized, is fixed subject to the \n17 \nadjustments expressly permitted by Section 6.3.1. Its levelized calculation uses a \n18 \ntwenty-year MTRC Term to recover the allocated capital cost and the return, \n19 \ntaxes, and fixed expenses reflected in Schedule 5. The Formula Rate revenue \n20 \nrequirement is recalculated each year using 13-month average balances and book \n21 \ndepreciation rates, so this January 1 in-service example includes a zero December \n22 \n2029 plant balance in the 13-month average even though the upgrade is in service \n23"},{"page":459,"startToken":160309,"endToken":160611,"text":"18 \n \nfor all of 2030. All else equal, the capital-related revenue requirement declines as \n1 \nthe plant depreciates. The difference does not affect DesertLink’s revenue: the \n2 \nCovered Upgrade is recovered through the Base TRR, and all TRBAA Credits are \n3 \nreturned to customers through the TRBAA. \n4 \nThe illustrative data are hypothetical and are not DesertLink or customer data. \n5 \nQ. \nPLEASE DESCRIBE EXHIBIT NO. DLK-205. \n6 \nA. \nExhibit No. DLK-205 illustrates the TRBA and TRBAA calculation for two consecutive \n7 \nTRBA years ending September 30, 2030 and 2031, using the Supplemental MTRC from \n8 \nExhibit No. DLK-101 and the Base TRR from Exhibit No. DLK-204. For trade months \n9 \nbefore January 2030, the example uses a Base TRR that excludes the Covered Upgrade; \n10 \nthe 2030 Base TRR is then held constant so the TRBA balances shown result only from \n11 \nthe TRBAA Credits. Two years are shown because the TRBAA operates on a lag: a \n12 \ncredit included in Cf in one filing is compared to actual receipts in the following TRBA \n13 \nyear, and any difference is returned in the filing after that. \n14 \n• In the TRBA year ending September 30, 2030, the annual $3,928,860 credit takes \n15 \neffect January 1, 2030, and Supplemental MTRC Receipts replace the reduction \n16 \nin CAISO payments.  Only a small timing difference remains, because the \n17 \nSupplemental MTRC is invoiced in equal monthly installments while CAISO \n18 \npayments reflect the days in each month.  The resulting TRBA balance of $3,883 \n19 \nand interest of $202 are returned to customers, and the TRBAA effective January \n20 \n1, 2031 is a credit of $3,932,944. \n21 \n• In the TRBA year ending September 30, 2031, the example assumes two \n22 \nhypothetical events.  First, the 2030 Reconciliation Statement shows that the \n23"},{"page":460,"startToken":160611,"endToken":160884,"text":"19 \n \nEligible Customer was under-billed by $100,000.  Under the CRA, that prior-\n1 \nperiod true-up adjustment is added to the Supplemental MTRC invoiced for 2032 \n2 \nand to the 2032 Forecast TRBAA Credit on Line 18b of $4,028,860, so it does not \n3 \ncreate a TRBA balance and carries no interest.  Second, the Eligible Customer \n4 \npays its installment for August 2031 service after September 30.  Together with \n5 \nthe remaining timing difference, the late payment produces a TRBA under-\n6 \ncollection of $325,636, which is included in Cr with interest of $800 and reverses \n7 \nwhen the payment is received in the next TRBA year.  The TRBAA effective \n8 \nJanuary 1, 2032 is a credit of $3,702,424. \n9 \nThe illustrative data are hypothetical and are not DesertLink or customer data. \n10 \nVIII. CONCLUSION \n11 \nQ. \nWHY ARE THE PROPOSED REVISIONS JUST AND REASONABLE? \n12 \nA. \nThe revisions implement the Commission’s direction that large load payments be credited \n13 \ntoward transmission owners’ revenue requirements, using DesertLink’s existing TRBAA \n14 \nmechanism. Each Eligible Customer pays at least its committed Annual MTRC for each \n15 \nCovered Upgrade, and TRBAA Credits reduce the TRR paid by all customers through the \n16 \nTAC. DesertLink retains none of the TRBAA Credits, and Attachment 12, Line 17a \n17 \nensures they are credited only once. The cost of service inputs and methods are \n18 \nunchanged, and Attachment 1a ties to the existing plant totals. The existing Formula Rate \n19 \nreview procedures and DesertLink’s annual TRBAA filing provide full transparency for \n20 \nthe new calculations. \n21 \nQ. \nDOES THIS CONCLUDE YOUR TESTIMONY? \n22 \nA. \nYes."},{"page":461,"startToken":160884,"endToken":160959,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \n \n \n \n \nDesertLink, LLC \nCalifornia Independent System Operator Corporation \n) \n) \nDocket No. \nDocket No.  \nER27-___-000 \nEL26-71-___ \n \nVERIFICATION  \n \n \n \nI, D. Eric Arzola, verify under penalty of perjury that I have read the testimony, know the \ncontents thereof, and that the facts and representations set forth therein are true to the best of my \nknowledge, information, and belief. \n \n \n \n \n \n \n \n \n \n \n/s/ D. Eric Arzola \n \n \n \n \n \n \nD. Eric Arzola \n \n \nDated: November 16, 2026"},{"page":462,"startToken":160959,"endToken":160965,"text":"Ex. DLK-201 \n \nFormula Rate Template (Clean)"},{"page":463,"startToken":160965,"endToken":161095,"text":"Projected ATRR\nFor the 12 months ended\n12/31/__\nFormula Rate Index\nDesertLink, LLC\nTable of Contents\nFormula Rate Template\nAttachments:\nAttachment No\nWorksheet Name\n1\nProject Revenue Requirement Worksheet\n1a\nProject Plant Detail Worksheet\n2\nIncentive Return\n3\nFormula Rate True-Up\n4\nRate Base Worksheet\n5\nReturn on Rate Base Worksheet\n6\nInterest on True-Up\n6A\nTrue-Up Interest Rate Calculator\n7\nWeighted Average Federal and State Income Tax Rates\n8\nCost of Debt Prior to Issuing Non-Construction Financing\n9\nTrue-Up - Construction Financing Cost of Debt\n10\nDepreciation Rates\n11\nPrior Period Adjustments\n12\nRevenue Credit Detail\n13\nExcess or Deficient Accumulated Deferred Income Taxes - Summary\n13.1\nRegulatory Assets/Liabilities for Deficient/Excess ADIT - Averaging and Proration Adjustments \n13.2\nRe-measurement of ADIT and Tax-related Regulatory Assets and Liabilities"},{"page":464,"startToken":161095,"endToken":161249,"text":"Formula Rate - Non-Levelized\nPage 1 of 5\nRate Formula Template\nUtilizing FERC Form 1 Data\nDesertLink, LLC\nProjected ATRR\nFor the 12 months ended\n12/31/__\n(1)\n(2)\n(3)\n(4)\n(5)\nLine\nAllocated \nNo.\nSource\nAmount\n1\nGROSS REVENUE REQUIREMENT, without incentives\n(Page 3, Line 49)\n $                               -   \nREVENUE CREDITS\n(Note A)\nTotal\nAllocator (W)\n2\nAccount No. 454\n(Page 4, Line 20)\n                                                  -   \nTP\n         1.0000 \n $                               -   \n3\nAccount No. 456.1\n(Page 4, Line 21)\n                                                  -   \nTP\n         1.0000 \n $                               -   \n4\nRevenues from Grandfathered Interzonal Transactions\n(Note B)\n                                                  -   \nTP\n         1.0000 \n $                               -   \n5\nRevenues from service provided by the ISO at a discount\n                                                  -   \nTP\n         1.0000 \n $                               -   \n6\nTOTAL REVENUE CREDITS\n(Sum of Lines 2 through 5)\n                                                  -   \n $                               -   \n7\nPrior Period Adjustments\nAttachment 11, Line 18, Col. B\n                                                  -   \nDA\n         1.0000 \n $                               -   \n8\nTrue-up Adjustment with Interest\nAttachment 3, Line 9, Col. J\n                                                  -   \nDA\n         1.0000 \n $                               -   \n9\nNET ANNUAL TRANSMISSION REVENUE REQUIREMENT\n(Line 1 less Line 6 plus Lines 7 and 8)\n $                               -"},{"page":465,"startToken":161249,"endToken":161729,"text":"Page 2 of 5\nRate Formula Template\nUtilizing FERC Form 1 Data\nDesertLink, LLC\nFor the 12 months ended\n12/31/__\nLine\n(1)\n(2)\n(3)\n(4)\n(5)\nNo.\nRATE BASE: (Note R)\nSource\nCompany Total\nAllocator (W)\nTransmission\nGROSS PLANT IN SERVICE\nNote C\n(Col 3 times Col 4)\n1\nProduction\n205.46.g for end of year, records for other months\n                                                  -   \nN/A\n                 -   \n                                  -   \n2\nTransmission\nAttachment 4, Line 14, Col. (b)\n                                                  -   \nTP\n         1.0000 \n                                  -   \n3\nDistribution\n207.75.g for end of year, records for other months\n                                                  -   \nN/A\n                 -   \n                                  -   \n4\nGeneral & Intangible\nAttachment 4, Line 14, Col. (c)\n                                                  -   \nWS\n         1.0000 \n                                  -   \n5\nTOTAL GROSS PLANT\n(Sum of Lines 1 through 4)\n                                                  -   \nGP=\n         1.0000 \n                                  -   \n6\nACCUMULATED DEPRECIATION\nNote C\n7\nProduction\n219.20-24.c for end of year, records for other months\n                                                  -   \nN/A\n                 -   \n                                  -   \n8\nTransmission\nAttachment 4, Line 14, Col. (h)\n                                                  -   \nTP\n         1.0000 \n                                  -   \n9\nDistribution\n219.26.c for end of year, records for other months\n                                                  -   \nN/A\n                 -   \n                                  -   \n10\nGeneral & Intangible\nAttachment 4, Line 14, Col. (i)\n                                                  -   \nWS\n         1.0000 \n                                  -   \n11\nTOTAL ACCUM. DEPRECIATION\n(Sum of Lines 7 through 10)\n                                                  -   \n                                  -   \n12\nNET PLANT IN SERVICE\n13\nProduction\n(Line 1 - Line 7)\n                                              -   \n                               -   \n14\nTransmission\n(Line 2 - Line 8)\n                                              -   \n                               -   \n15\nDistribution\n(Line 3 - Line 9)\n                                              -   \n                               -   \n16\nGeneral & Intangible\n(Line 4 - Line 10)\n                                              -   \n                               -   \n17\nTOTAL NET PLANT\n( Sum of Lines 13 through 16)\n                                              -   \nNP=\n         1.0000 \n                               -   \n18\nADJUSTMENTS TO RATE BASE\n19\nAccount No. 281 (enter negative)\nAttachment 4, Line 28, Col. (d) (Note D)\n                                              -   \nN/A\n                 -   \n                               -   \n20\nAccount No. 282 (enter negative)\nAttachment 4, Line 28, Col. (e) (Note D)\n                                              -   \nNP\n         1.0000 \n                               -   \n21\nAccount No. 283 (enter negative)\nAttachment 4, Line 28, Col. (f) (Note D)\n                                              -   \nNP\n         1.0000 \n                               -   \n22\nAccount No. 190\nAttachment 4, Line 28, Col. (g) (Note D)\n                                              -   \nNP\n         1.0000 \n                               -   \n22a\nDeficient or (Excess) Accumulated Deferred Income Taxes\nAttachment 13, Line 7 (Note X)\n                                                  -   \nNP\n         1.0000 \n                               -   \n23\nAccount No. 255 (enter negative)\nAttachment 4, Line 28, Col. (h) (Note D)\n                                              -   \nNP\n         1.0000 \n                               -   \n24\nUnfunded Reserves (enter negative)\nAttachment 4, Line 43, Col. (h)\n                                              -   \nDA\n         1.0000 \n                               -   \n25\nCWIP\nAttachment 4, Line 14, Col. (d)\n                                              -   \nDA\n         1.0000 \n                               -   \n26\nUnamortized Regulatory Asset\nAttachment 4, Line 28, Col. (b) (Note E)\n                                              -   \nDA\n         1.0000 \n                               -   \n27\nUnamortized Abandoned Plant\nAttachment 4, Line 28, Col. (c) (Note F)\n                                              -   \nDA\n         1.0000 \n                               -   \n28\nTOTAL ADJUSTMENTS\n( Sum of Lines 19 through 27)\n                                              -   \n                                  -   \n29\nLAND HELD FOR FUTURE USE\nAttachment 4, Line 14, Col. (e) (Note G)\n                                              -   \nTP\n         1.0000 \n                               -   \n30\nWORKING CAPITAL\nNote H\n31\nCash Working Capital\n1/8*(Page 3, Line 17 minus Page 3, Line 14)\n                                              -   \n                               -   \n32\nMaterials & Supplies\nAttachment 4, Line 14, Col. (f)\n                                              -   \nTP\n         1.0000 \n                               -   \n33\nPrepayments (Account 165)\nAttachment 4, Line 14, Col. (g)\n                                              -   \nGP\n         1.0000 \n                               -   \n34\nTOTAL WORKING CAPITAL\n( Sum of Lines 31 through 33)\n                                              -   \n                                  -   \n35\nRATE BASE\n( Sum of Lines 17, 28, 29, and 34)\n                                              -   \n                                  -   \nFormula Rate - Non-Levelized"},{"page":466,"startToken":161729,"endToken":162258,"text":"Page 3 of 5\nRate Formula Template\nUtilizing FERC Form 1 Data\nDesertLink, LLC\nFor the 12 months ended\n12/31/__\nLine\n(1)\n(2)\n(3)\n(4)\n(5)\nNo.\nSource\nCompany Total\nAllocator (W)\nTransmission\nO&M\n(Col 3 times Col 4)\n1\nTransmission\n321.112.b\n                                                  -   \nTP\n         1.0000 \n                                  -   \n2\nLess Account 566 (Misc Trans Expense)\n321.97.b\n                                                  -   \nTP\n         1.0000 \n                                  -   \n3\nLess Account 565\n321.96.b\n                                                  -   \nTP\n         1.0000 \n                                  -   \n4\nA&G\n323.197.b\n                                                  -   \nWS\n         1.0000 \n                                  -   \n5\nLess FERC Annual Fees\n351.h (Note I)\n                                                  -   \nWS\n         1.0000 \n                                  -   \n6\nLess EPRI Dues\nNote J\n                                                  -   \nWS\n         1.0000 \n                                  -   \n7\nLess Reg. Commission Expense Account 928\nNote J\n                                                  -   \nWS\n         1.0000 \n                                  -   \n8\nLess: Non-safety Advertising account 930.1\nNote J\n                                                  -   \nWS\n         1.0000 \n                                  -   \n9\n10\nPlus Transmission Related Reg. Comm. Exp.\nNote K\n                                                  -   \nTP\n         1.0000 \n                                  -   \n11\n12\nPlus Transmission Lease Payments in Acct 565\nNote V\n                                                  -   \nDA\n         1.0000 \n                                  -   \n13\nAccount 566\n14\nAmortization of Regulatory Asset\nNote E\n                                                  -   \nDA\n         1.0000 \n                                  -   \n15\nMisc. Transmission Expense (less amort. of regulatory asset)\n321.97.b less line 14\n                                                  -   \nTP\n         1.0000 \n                                  -   \n16\nTotal Account 566\n(Sum of Lines 14 through 15) Ties to 321.97b\n                                                  -   \n                                  -   \n17\nTOTAL O&M\n                                                  -   \n                                  -   \n18\nDEPRECIATION EXPENSE\nNote C\n19\nTransmission\n336.7.b&d\n                                                  -   \nTP\n         1.0000 \n                                  -   \n20\nGeneral & Intangible\n336.10.b&d, 336.1.b&d\n                                                  -   \nWS\n         1.0000 \n                                  -   \n21\nAmortization of Abandoned Plant\nNote F\n                                                  -   \nDA\n         1.0000 \n                                  -   \n22\nTOTAL DEPRECIATION\n(Sum of Lines 19 through 21)\n                                                  -   \n                                  -   \n23\nTAXES OTHER THAN INCOME TAXES   (Note M)\n24\nLABOR RELATED\n25\nPayroll\n263.i\n                                                  -   \nWS\n         1.0000 \n                                  -   \n26\n263.i\n                                                  -   \nWS\n         1.0000 \n                                  -   \n27\nPLANT RELATED\n28\nProperty\n263.i\n                                                  -   \nGP\n         1.0000 \n                                  -   \n29\nGross Receipts\n263.i\n                                                  -   \nN/A\n         \n                                  -   \n30\nOther\n263.i\n                                                  -   \nGP\n         1.0000 \n                                  -   \n31\nPayments in lieu of taxes\n263.i\n                                                  -   \nGP\n         1.0000 \n                                  -   \n32\nTOTAL OTHER TAXES\n( Sum of Lines 25 through 31)\n                                                  -   \n                                  -   \n33\nINCOME TAXES    (Note N)\nNote N\n34\nT=1 - {[(1 - SIT) * (1 - FIT)] / (1 - SIT * FIT * p)}\n0.00%\n35\nCIT=(T/1-T) * (1-(WCLTD/R)) =\nWCLTD = Page 4, Line 15, R = Page 4, Line 18\n0.00%\n36\nFIT & SIT & P\n37\n38\n1 / (1 - T)  = (from line 35)\n1 / (1 - T), T from Line 35\n                                         1.0000 \n39\nAmortized Investment Tax Credit\n266.8f (enter negative) (Note D)\n                                                  -   \n40\nDeficient or (Excess) Deferred Income Taxes\nAttachment 13, Line 12, Col. (d) (Note X)\n                                                  -   \n41\nTax Effect of Permanent Differences\nNote O\n                                                  -   \n42\nIncome Tax Calculation\n(Line 35 times Line 48)\n                                                  -   \nN/A\n                                  -   \n43\nITC adjustment\n(Line 38 times Line 39)\n                                                  -   \nNP\n         1.0000 \n                                  -   \n44\nDeficient or (Excess) Deferred Income Tax Adjustment\nAttachment 13, Line 12, Col. (f) (Note X)\n                                                  -   \nNP\n         1.0000 \n                                  -   \n45\nPermanent Differences Tax Adjustment\n(Line 38 times Line 41)\n                                                  -   \nNP\n         1.0000 \n                                  -   \n46\nTotal Income Taxes\n(Sum of Lines 42 through 45)\n                                                  -   \n                                  -   \n47\nRETURN\n48\nRate Base times Return\n(Page 2, Line 35 times Page 4, Line 18)\n                                                  -   \nN/A\n                 -   \n                                  -   \n49\nGROSS REVENUE REQUIREMENT\n( Sum of Lines  17, 22, 32, 46, and 48)\n                                                  -   \n                                  -   \n(Sum of Lines 1, 4, 10, 12, and 16 less Sum of Lines 2, 3, and 5 \nthrough 8)\nHighway and vehicle"},{"page":467,"startToken":162258,"endToken":162528,"text":"Formula Rate - Non-Levelized\nPage 4 of 5\nRate Formula Template\nUtilizing FERC Form 1 Data\nDesertLink, LLC\nFor the 12 months ended\n12/31/__\nLine\n(1)\n(2)\n(3)\n(4)\n(5)\nNo.\nSUPPORTING CALCULATIONS AND NOTES\nTRANSMISSION PLANT INCLUDED IN ISO RATES\n1\nTotal Transmission plant\n(Page 2, Line 2, Col. 3)\n                                  -   \n2\n(Note P)\n                                  -   \n3\n(Note S)\n                                  -   \n4\nTransmission plant included in ISO rates\n(Line 1 minus Lines 2 and 3)\n                                  -   \n5\nPercentage of Transmission plant included in ISO Rates\n(Line 4 divided by Line 1)\nTP =                               1.00 \n6\nWAGES & SALARY ALLOCATOR (W&S)\nForm 1 Reference\n$\nTP\nAllocation\n7\nProduction\n354.20.b\n                                                  -   \n            -                    -   \n8\nTransmission\n354.21.b\n                                                  -   \n        1.00                  -   \n9\nDistribution\n354.23.b\n                                                  -   \n            -                    -   \nW&S Allocator\n10\nOther\n354.24,25,26.b\n                                                  -   \n            -                    -   \n($ / Allocation)\n11\nTotal (W&S Allocator is 1 if lines 7-10 are zero)\n(Sum of Lines 7 through 10)\n                                                  -   \n                 -   \n=\n                        1.00000  = WS\n12\nRETURN (R)\n13\n14\n$\n%\nCost\nWeighted\n15\nLong Term Debt\nAttachment 5, Line 8 (Notes Q & R)\n                                                  -   \n50.0%\n0.00%\n0.00% = WCLTD\n16\nPreferred Stock (112.3.c)\nAttachment 5, Line 9 (Notes Q & R)\n                                                  -   \n0.0%\n0.00%\n0.00%\n17\nCommon Stock\nAttachment 5, Line 10 (Notes Q, R, and T)\n                                                  -   \n50.0%\n9.80%\n4.90%\n18\nTotal\n( Sum of Lines 15 through 17)\n                                                  -   \n4.90% = R\n19\nREVENUE CREDITS\n$\n20\nAttachment 12, Line 8, Col. C (Note U)\n                                  -   \n21\nACCOUNT 456.1 (OTHER ELECTRIC REVENUES)\nAttachment 12, Line 18, Col. C (Note A)\n                                  -   \nLess Transmission plant excluded from ISO rates\nLess Transmission plant included in OATT Ancillary Service \nrates\nACCOUNT 454 (RENT FROM ELECTRIC"},{"page":468,"startToken":162528,"endToken":164103,"text":"Formula Rate - Non-Levelized\nPage 5 of 5\nRate Formula Template\nUtilizing FERC Form 1 Data\nDesertLink, LLC\nFor the 12 months ended\n12/31/__\nGeneral Note: References to pages in this formula rate template are indicated as: (Page #, Line #, Col. #)\nReferences to data from FERC Form 1 are indicated as: #.y.x (page, line, column)\nNotes\nA\nB\nCompany will not have any grandfathered agreements. Therefore, this line shall remain zero.\nC\nPlant In Service, Accumulated Depreciation, and Depreciation Expenses shall exclude Asset Retirement Obligation amounts.\nD\nE\nF\nUnamortized Abandoned Plant and Amortization of Abandoned Plant will be zero until the Commission accepts or approves recovery of the cost of Abandoned Plant. Utility must submit a Section 205 filing to recover the cost of abandoned plant.\nG\nIdentified in FERC Form 1, or Company records if not so indicated on the FERC Form 1, as being transmission related.\nH\nI\nJ\nPage 3, Line 6 - Subtract all EPRI Annual Membership Dues listed in Form 1 at 353.f, all Regulatory Commission Expenses in account 928 itemized at 351.h, and non-safety related advertising included in Account 930.1.\nK\nPage 3, Line 8-Add back Regulatory Commission Expenses directly related to transmission service, ISO filings, or transmission siting itemized at 351.h.\nM\nN\nInputs Required:\nFIT = \n0.0%\n(Weighted Average Federal Income Tax Rate (Attachment 7, line 4, col. (i))\nSIT = \n0.0%\n(Weighted Average State Income Tax Rate (Attachment 7, line 8, col. (i))\np = \n0.0%\n(Percent of federal income tax deductible for state purposes)\nO\nP\nRemoves transmission plant determined by Commission order to be state-jurisdictional according to the seven-factor test (until Form 1 balances are adjusted to reflect application of seven-factor test).\nQ\nR\nS\nT\nThe rate of return on common equity (\"ROE\") will be supported in the original Section 205 filing and shall, at no time during the life of the Project, be higher than 9.8%, including adders.  No change in ROE may be made absent a filing with FERC.\nU\nIncludes only income related to transmission facilities, such as pole attachments, rentals and special use from general ledger.\nV\nAdd back any lease expense of transmission assets used to provide service under this tariff included in account 565. Amount to be obtained from company books and records.\nW\nDA = Direct Assignment; GP = Gross Plant Allocator (page 2, line 5); N/A = Not Applicable; NP = Net Plant Allocator (page 2, line 17); TP = Transmission Plant Allocator (page 4, line 5); WS = Wage and Salary Allocator (page 4, line 11).\nX\nThe revenues credited on page 1, lines 2-6, shall include only the amounts received by DesertLink for service rendered using facilities for which recovery is provided under this tariff. They do not include revenues associated with FERC annual charges, gross \nreceipts taxes, or facilities not included in this template (e.g., direct assignment facilities and GSUs) which are not recovered under this Rate Formula Template.\nAccumulated deferred income tax amounts associated with asset or liability accounts excluded from rate base (such as ADIT related to asset retirement obligations and certain tax-related regulatory assets or liabilities) do not affect rate base.  Balance of Account \n255 will be reduced by prior flow throughs and excluded if the utility chooses to utilize amortization of tax credits against taxable income. Account 281 is not allocated to Transmission.\nRecovery of Regulatory Asset permitted only for pre-commercial and formation expenses as authorized by the Commission. Recovery of any other regulatory assets requires authorization from the Commission. A carrying charge equal to the AFUDC rate will \nbe applied to the Regulatory Asset prior to the rate year when costs are first recovered.\nCash Working Capital assigned to transmission is one-eighth of O&M allocated to transmission at page 3, line 17, column 5 minus amortization of Regulatory Asset at page 3, line 14, column 5.  Prepayments are the electric related prepayments booked to \nAccount No. 165 and reported on page 111, line 57 in the Form 1.\nThe FERC's annual charges for the year assessed the Transmission Owner for service under this tariff.  To the extent the charges are separately identified on the FERC Form 1, page 350, column 1, the line number will be added to the source in Column 2 for \nreference.  Line item references can change from year to year.  Items not specifically identified in the FERC Form 1, page 350 will be obtained from Company books and records.\nIncludes only FICA, unemployment, highway, property, gross receipts, and other assessments charged in the current year.  Taxes related to income are excluded.  Enter the line number on page 262-63 upon which each item is identified.  To the extent individual \ntypes of taxes are separately identified on the FERC Form 1, page 262, column a, the line number will be added to the source in Column 2 for reference.  Line item references can change from year to year.  Items not specifically identified in the FERC Form 1, \npage 262-63 will be obtained from Company books and records.\nFIT is the weighted average Federal income tax rate and SIT is the weighted average State income tax rate, both from Attachment 7, and p is the \"the percentage of federal income tax deductible for state income taxes\". A utility that elected to utilize amortization \nof tax credits against taxable income, rather than book tax credits to Account No. 255 and reduce rate base, must reduce its income tax expense by the amount of the Amortized Investment Tax Credit (Form 1, 266.8.f) multiplied by (1/1-T) (page 3, line 26).  \nExcess Deferred Income Taxes reduce income tax expense by the amount of the expense multiplied by (1/(1-T)).\nThe Tax Effect of Permanent Differences captures the differences in the income taxes due under the Federal and State calculations and the income taxes calculated in Appendix III that are not the result of a timing difference. Tax Effect equals Permanent \nDifferences multiplied by T.\nThe cost of debt will be determined based on the financing in place during each stage of project development. Before debt is obtained, a proxy interest rate which will be supported in the original Section 205 filing will be used. This rate is provided on \nAttachment 8 line 36. If construction debt (wherein principal is drawn down over time) is issued, the rate plus an amortization of fees projected to be incurred on the construction debt during the rate year will be the cost of debt. This construction debt rate \n(inclusive of fees) will be reset and trued-up every year using the method on Attachment 9 for multi-year construction projects. Once non-construction debt is obtained, the actual interest rate and fees on the debt in place at the end of the year such non-\nconstruction debt is obtained will become the cost of debt. In the first full year after non-construction debt is obtained, the cost of debt will be the actual cost of debt determined using the method on Attachment 5. \nA h\nh i\nl\ni l\nf 50% E\ni\nd 50% d b\nill b\nd\nil h fi\ni i\ni\nl\nd i\ni\nil\nh\ni\nh\ni\nd b\nh C\ni i\nAf\nh f\nili i\nl\nd i\ni\nh l\nf\n50%\ni\nh\nh i\nl\nCalculate rate base using 13 month average balance, except ADIT.  The calculation of ADIT in the annual true-up calculation will use the beginning-of-year and end-of-year balances, and will be performed in accordance with IRS regulation Section 1.167(l)-\n1(h)(6).  The calculation of ADIT in the annual projection will be performed in accordance with IRS Regulation Section 1.167(l)-1(h)(6). \nRemoves dollar amount of transmission plant to be included in the development of OATT ancillary services rates and generation step-up facilities, which are deemed to be included in OATT ancillary services. For these purposes, generation step-up facilities are \nthose facilities at a generator substation on which there is no through-flow when the generator is shut down.\nUpon enactment of changes in tax law, ADIT balances are re-measured and adjusted in the Company’s books of account, resulting in excess or deficient accumulated deferred income tax assets and liabilities.  Excess or deficient ADIT attributable to timing \ndifferences between the amounts of expenses or revenues recognized for income tax purposes and amounts of expenses or revenues recognized for ratemaking purposes as well as subsequent recoverable or refundable amortization of such amounts will be based \nupon Company records and be calculated and recorded in accordance with ASC 740 and any applicable normalization requirements of the taxing jurisdiction.  The Deficient or (Excess) Deferred Income Tax Adjustment (page 3, line 44) is computed by \nmultiplying each component of Deficient or (Excess) Deferred Income Taxes (page 3, line 40) by the applicable tax gross-up factor.  For each re-measurement of ADIT, the amounts entered as the Deficient or (Excess) Accumulated Deferred Income Taxes \ncomponent of ADJUSTMENTS TO RATE BASE (page 2, line 22a) or as the Deficient or (Excess) Deferred Income Tax Adjustment component of INCOME TAXES (page 3, line 44) will be supported by Attachment 13 (Deficient or Excess Accumulated \nDeferred Income Taxes) providing the balance for each taxing jurisdiction at the beginning and end of the year, amortization for the year, calculation of the gross-up to the revenue requirement level and any other information required to support compliance with \nany applicable normalization requirements."},{"page":469,"startToken":164103,"endToken":164435,"text":"Page 1 of 3\nFor the twelve months ended 12/31/__\nAttachment 1\nProject Revenue Requirement Worksheet\nDesertLink, LLC\nTo be completed in conjunction with Appendix III.\nLine\n(1)\n(2)\n(3)\n(4)\nNo.\nAppendix III, Page, Line, Col.\nTransmission\nAllocator\n1\nGross Transmission Plant plus CWIP\nAppendix III, p 2, line 2, col 5 plus line 25, col 5 (Note A)\n                                                         -   \n2\nNet Transmission Plant plus CWIP and Abandoned Plant\nAppendix III, p 2, line 14, col 5 plus line 25 & 27, col 5 (Note B)\n                                                         -   \nO&M EXPENSE\n3\nTotal O&M Allocated to Transmission\nAppendix III, p 3, line 17, col 5\n                                                         -   \n4\nAnnual Allocation Factor for O&M\n(line 3 divided by line 1, col 3)\n0.00%\n0.00%\nGENERAL AND INTANGIBLE (G&I) DEPRECIATION EXPENSE\n5\nTotal G&I Depreciation Expense\nAppendix III, p 3, line 20, col 5 (Note C)\n                                                         -   \n6\nAnnual Allocation Factor for G&I Depreciation Expense\n(line 5 divided by line 1, col 3)\n0.00%\n0.00%\nTAXES OTHER THAN INCOME TAXES\n7\nTotal Other Taxes\nAppendix III, p 3, line 32, col 5\n                                                         -   \n8\nAnnual Allocation Factor for Other Taxes\n(line 7 divided by line 1, col 3)\n0.00%\n0.00%\n9\nLess Revenue Credits\nAppendix III, p 1, line 6 col 5\n                                                         -   \n10\nAnnual Allocation Factor for Revenue Credits\n(line 9 divided by line 1, col 3)\n0.00%\n0.00%\n11\nAnnual Allocation Factor for Expense\nSum of lines 4, 6, 8, and 10\n0.00%\nINCOME TAXES \n12\nTotal Income Taxes\nAppendix III, p 3, line 46, col 5\n                                                         -   \n13\nAnnual Allocation Factor for Income Taxes\n(line 12 divided by line 2, col 3)\n0.00%\n0.00%\nRETURN\n14\nReturn on Rate Base\nAppendix III, p 3, line 48, col 5\n                                                         -   \n15\nAnnual Allocation Factor for Return on Rate Base\n(line 14 divided by line 2, col 3)\n0.00%\n0.00%\n16\nAnnual Allocation Factor for Return\nSum of lines 13 and 15\n0.00%"},{"page":470,"startToken":164435,"endToken":164636,"text":"Page 2 of 3\nFor the twelve months ended 12/31/__\nAttachment 1\nProject Revenue Requirement Worksheet\nDesertLink, LLC\nAny hypothetical amounts or project names in a filed template will be removed and replaced with actual amounts in the first year actual values are available without the need for a section 205 filing to modify the template.\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\nProject Name\nCAISO Category\nIdentifier\nProject Gross Plant\nProject Net Plant\nAnnual Return Charge\n(Note D)\n(Page 1, line 11)\n(Col. 3 * Col. 4)\n(Note E)\n(Page 1, line 16)\n(Col. 6 * Col. 7)\n1a\nProject A\nAAAA\n                                                  -   \n0.00%\n                       -    $                                                      -   \n0.00%\n                                        -   \n1b\nProject B\nBBBB\n                                                  -   \n0.00%\n                       -    $                                                      -   \n0.00%\n                                        -   \n2\nTotal Schedule 12\n                                                  -   \n                       -    $                                                      -   \n                                        -   \n3a\nProject C\nCCCC\n                                                  -   \n0.00%\n                       -    $                                                      -   \n0.00%\n                                        -   \n3b\nProject D\nDDDD\n                                                  -   \n0.00%\n                       -    $                                                      -   \n0.00%\n                                        -   \n4\nTotal Zonal\n                                                  -   \n                       -    $                                                      -   \n                                        -   \n5\nOther\n                                                  -   \n0.00%\n                       -    $                                                      -   \n0.00%\n                                        -   \n6\nAnnual Totals\n                                                  -   \n                       -    $                                                      -   \n                                        -   \nThis worksheet is used to compute project specific revenue requirements for any projects for which such calculation is required by CAISO. Other projects which comprise the remaining revenue requirement on Appendix III will \nnot be entered on this schedule.\nLine \nNo.\nAnnual Allocation \nFactor for Expense\nAnnual \nExpense \nCharge\nAnnual \nAllocation \nFactor for \nReturn"},{"page":471,"startToken":164636,"endToken":165082,"text":"Page 3 of 3\nFor the twelve months ended 12/31/__\nAttachment 1\nProject Revenue Requirement Worksheet\nDesertLink, LLC\n(9)\n(10)\n(11)\n(12)\n(12a)\n(13)\n(14)\n(15)\n(16)\nIncentive Return\nCeiling Rate\n(Note F)\n(Sum Col. 5, 8 & 9)\n(Note G)\n(Sum Col. 10 & 12)\n(Note H)\n(Sum Col. 10 & 12 Less Col. 13)\n(Note I)\n(Sum Col. 14 & 15)\n1a\n                                         -                             -   \n                              -                                              -   \n                             -                          -                                                            -                          -                                           -   \n1b\n                                         -                             -   \n                              -                                              -   \n                             -                          -                                                            -                          -                                           -   \n2\n                                         -                                 -   \n                                                  -                                -                          -                                                            -                          -                                           -   \n3a\n                                         -                             -   \n                              -                                              -   \n                             -                          -                                                            -                          -                                           -   \n3b\n                                         -                             -   \n                              -                                              -   \n                             -                          -                                                            -                          -                                           -   \n4\n                                         -                                 -   \n                                                  -                                -                          -                                                            -                          -                                           -   \n5\n                                         -                             -   \n                              -                                              -   \n                             -                          -                                                            -                          -                                           -   \n6\n                                         -                                 -   \n                                                  -                                -                          -                                                            -                          -                                           -   \nNotes\nA\nGross Transmission Plant is that identified on page 2 line 2 of Appendix III inclusive of any CWIP or unamortized abandoned plant included in rate base when authorized by FERC order.\nB\nNet Plant is that identified on page 2 line 14 of Appendix III inclusive of any CWIP or unamortized Abandoned Plant included in rate base when authorized by FERC order less any prefunded AFUDC, if applicable.\nC\nD\nE\nProject Net Plant is the Project Gross Plant Identified in Column 3 less the associated Accumulated Depreciation plus CWIP in rate base if applicable and Unamortized Abandoned Plant.  Refer to Attachment 1a for detail.\nF\nG\nRequires approval by FERC of incentive return applicable to the specified project(s).\nH\nI\nTrue-Up Adjustment is calculated on the Project True-up Schedule for the relevant true-up year.\nLine \nNo.\nProject \nDepreciation/Amortizatio\nn Expense\nAnnual Revenue \nRequirement\nIncentive Return in \nBasis Points\nCompetitive \nConcession\nTotal Annual Revenue \nRequirement\nTrue-Up \nAdjustment\nNet Revenue \nRequirement\n(Attachment 2, Line 28 Incentive \nReturn * Col. 6 * Col. 11/100)\nGeneral and Intangible Depreciation and Amortization Expense includes all expenses (except depreciation and armortization of G&I Asset Retirement Obligations) not directly associated with a project, which is entered on page 3 , \ncolumn 9.\nProject Gross Plant is the total capital investment including CWIP for the project calculated from Company books and records in the same method as the gross plant value in line 1.  This value includes subsequent capital \ninvestments required to maintain the facilities to their original capabilities.  Refer to Attachment 1a for detail.\nProject Depreciation Expense is the actual value booked for the project (excluding General and Intangible depreciation) at Appendix III, page 3, line 19, plus amortization of Abandoned Plant at Appendix III, page 3, line 21.  For \neach project on Attachment 1a, Depreciation Expense is Attachment 1a, Line 2, Column (15) minus Column (3), and Amortization of Abandoned Plant is the difference between Columns (3) and (15) on Attachment 1a, Line 4.\nThe Competitive Concession is the reduction in revenue, if any, that the company agreed to, for instance, to be selected to build facilities as the result of a competitive process and equals the amount by which the  annual revenue \nrequirement is reduced from the ceiling rate."},{"page":472,"startToken":165082,"endToken":165410,"text":"Att 1a - Project Plant Detail\n Page 10\nPage 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 1a\nProject Plant Detail Worksheet\nDesertLink, LLC\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\n(15)\nProject Name\n13-month average\n1a\nProject A\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n1b\nProject B\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n…\n…\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n1\nTotal Project Transmission Gross Plant\n                                                                -                                -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\n(15)\nProject Name\n13-month average\n2a\nProject A\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n2b\nProject B\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n…\n…\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n2\nTotal Project Transmission Accumulated Depreciation\n                                                                -                                -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\n(15)\nProject Name\n13-month average\n3a\nProject A\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n3b\nProject B\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n…\n…\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n3\nTotal Project CWIP\n                                                                -                                -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\n(15)\nProject Name\n13-month average\n4a\nProject A\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n4b\nProject B\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n…\n…\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n4\nTotal Project Unamortized Abandoned Plant\n                                                                -                                -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n(1)\n(2)\nProject Name\n5a\nProject A\n                                                                -   \n5b\nProject B\n                                                                -   \n…\n…\n … \n5\nTotal Project Transmission Net Plant\n                                                                -   Ties to Appendix III, p 2, line 14, col 5 plus line 25 & 27, col 5; Used on Attachment 1, Column (6) \nLine \nNo.\nProject\nTransmission \nGross Plant\n20__\nDecember\n20__\nJanuary\n20__\nFebruary\n20__\nMarch\n20__\nApril\n20__ \nMay\n20__ \nJune\n20__ \nJuly\n20__\nAugust\n20__\nSeptember\n20__\nOctober\n20__ \nNovember\n20__\nDecember\nLine \nNo.\nProject\nTransmission Accumulated \nDepreciation \n20__\nDecember\n20__\nJanuary\n20__\nFebruary\n20__\nMarch\n20__\nApril\n20__ \nMay\n20__ \nJune\n20__ \nJuly\n20__\nAugust\n20__\nSeptember\n20__\nOctober\n20__ \nNovember\n20__\nDecember\nLine \nNo.\nProject CWIP\n20__\nDecember\n20__\nJanuary\n20__\nFebruary\n20__\nMarch\n20__\nApril\n20__ \nMay\n20__ \nJune\n20__ \nJuly\n20__\nAugust\n20__\nSeptember\n20__\nOctober\n20__ \nNovember\n20__\nDecember\nLine \nNo.\nProject \nUnamortized Abandoned Plant\n20__\nDecember\n20__\nJanuary\n20__\nFebruary\n20__\nMarch\n20__\nApril\n20__ \nMay\n20__ \nJune\n20__ \nJuly\n20__\nAugust\n20__\nSeptember\n20__\nOctober\n20__ \nNovember\n20__\nDecember\nLine \nNo.\nProject\nTransmission \nNet Plant\n13-month average\n(Line 1 - Line 2 + Line 3 + Line 4)"},{"page":473,"startToken":165410,"endToken":165887,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 2\nIncentive Return\nDesertLink, LLC\nLine\n1\nRate Base\nAppendix III, Page 2, Line 35, Col.5\n                                                                         -   \n2\n100 Basis Point Incentive Return\n$\nCost\n$\n%\nWeighted\n3\nLong Term Debt\n(Notes Q & R from Appendix III) \n                            -   \n50.00%\n0.00%\n0.00%\n4\nPreferred Stock\n(Notes Q & R from Appendix III) \n                            -   \n0.00%\n0.00%\n0.00%\n5\nCommon Stock\n(Notes Q, R, & T from Appendix III)\n                            -   \n50.00%\n10.80%\n5.40%\n6\nTotal (sum lines 3-5)\n                            -   \n5.40%\n7\n100 Basis Point Incentive Return multiplied by Rate Base (line 1 * line 6)\n                                                                         -   \n8\nINCOME TAXES\n9\nT=1 - {[(1 - SIT) * (1 - FIT)] / (1 - SIT * FIT * p)} =\n0.00%\n10\nCIT=(T/1-T) * (1-(WCLTD/R)) =\n0.00%\n11\nWCLTD\nLine 3\n0.00%\n12\nFIT, SIT & p are as given in Appendix III footnote N.\n13\n1 / (1 - T)\nLine 9\n                    1.0000 \n14\nAmortized Investment Tax Credit (266.8f) (enter negative)\nAppendix III, Page 3, Line 39\n                            -   \n15\nDeficient or (Excess) Deferred Income Taxes\nAppendix III, Page 3, Line 40\n                            -   \n16\nTax Effect of Permanent Differences (Note B)\nAppendix III, Page 3, Line 41\n                            -   \n17\nIncome Tax Calculation\nLine 7 times Line 10\n                        -   \n18\nITC adjustment\nLine 13 times Line 14\n                            -   \nNP             1.00                         -   \n19\nDeficient or (Excess) Deferred Income Tax Adjustment\nAppendix III, Page 3, Line 44\n                            -   \nNP             1.00                         -   \n20\nPermanent Differences Tax Adjustment\nLine 13 times Line 16\n                            -   \nNP             1.00                         -   \n21\nTotal Income Taxes\nSum of Lines 17 through 20\n                            -   \n                        -                                                                            -   \n22\nReturn and Income Taxes with 100 basis point increase in ROE\n                                                                         -   \n23\nReturn\n(Appendix III, page 3, line 48, col 5)\n                                                                         -   \n24\nIncome Tax\n(Appendix III, page 3, line 46, col 5)\n                                                                         -   \n25\nReturn and Income Taxes without 100 basis point increase in ROE\nSum of Lines 23 and 24\n                                                                         -   \n26\nIncremental Return and Income Taxes for 100 basis point increase in ROE\nLine 22 less Line 25\n                                                                         -   \n27\nRate Base\nLine 1\n                                                                         -   \n28\nIncremental Return and Income Taxes for 100 basis point increase in ROE divided by Rate Base Line 26 divided by Line 27\n0.00%\nNotes\nA\nB\nThe Tax Effect of Permanent Differences captures the differences in the income taxes due under the Federal and State calculations and the income taxes calculated in Appendix III that are not the result of a timing difference.\nCost = Appendix III, Page 4, Line 17, \nplus 100 bp\nThe 100 basis point increase in ROE is used only to determine the increase in return and income taxes associated with a 100 basis point increase in ROE and does not reflect what incentives the Commission \nmay approve for a specific transmission project. The overall ROE inclusive of incentives is subject to the limitations noted in Appendix III, Note T.  Any ROE actual incentive must be approved by the \nCommission."},{"page":474,"startToken":165887,"endToken":166433,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 3\nFormula Rate True-Up\nDesertLink, LLC\nAny hypothetical amounts or project names in a filed template will be removed and replaced with actual amounts in the first year actual values are available without the need for a section 205 filing to modify the template.\nAnnual True-Up Calculation\nLine\n1\nTrue-Up Year\n2\nC\nD\n                             -   \nF\nG\nH\nI\nJ\nA\nB\nE\nProject Name\n3\nRemaining Appendix III\n0.0%\n                             -   \n                               -    $                          -   \n                             -   \n4a\nProject A\nAAAA\n                             -   \n0.0%\n                             -                                  -                                  -    $                          -                                -                                -   \n4b\nProject B\nBBBB\n                             -   \n0.0%\n                             -                                  -                                  -    $                          -                                -                                -   \n5\nTotal Schedule 12\n                             -   \n                             -                                  -                                  -    $                          -                                -                                -   \n6a\nProject C\nCCCC\n                             -   \n0.0%\n                             -                                  -                                  -    $                          -                                -                                -   \n6b\nProject D\nDDDD\n                             -   \n0.0%\n                             -                                  -                                  -    $                          -                                -                                -   \n7\nTotal Zonal\n                             -   \n                             -                                  -                                  -    $                          -                                -                                -   \n8\nOther\n                             -   \n0.0%\n                             -                                  -                                  -    $                          -                                -                                -   \n9\n                             -   \n0.0%\n                             -                                  -                                  -                                -                                -                                -   \n10\n $                          -   Total Interest on True-Up - Attachment 6\nPrior Period Adjustment\nA\nB\nSource\n11\nDescription of Adjustment\n                 -   \nNotes\n1)\nThe revenue received is the total amount of revenue distributed to company in the  year as shown on pages 328-330 of the Form No 1. The Revenue Received is input on line 2, Col. E.\n2)\nFrom the Attachment 1, lines 1a through 6, col. 16 from the template in which the true-up year revenue requirement was initially projected.\n3)\nFrom True-Up revenue requirement template Attachment 1, lines 1a through 6, col. 14.\n4)\n5)\nCorrections to true-ups for previous rate years including interest will be computed on Attachment 11 and entered on the appropriate line 3-8 above.\nThis Attachment 3 is used to calculate the annual formula rate true-up. Any projects for which the RTO requires a true-up on an individual project basis, as shown on Attachment 1, will be computed separately. The remainder of the \nrevenue requirement will also be trued up. The utility will individually enter the projected true-up year revenue requirements in Column C. A percentage of total will be calculated in Column D. Actual revenue received during the \ntrue-up year is entered into Column E, line 2 and allocated using the Column D percentage. The utility will prepare this formula rate template with the actual inputs for the true-up year, with the resulting revenue requirement for each \nline being separately entered in Column F.  In Col. G, Col. F is subtracted from Col. E to calculate the true-up adjustment. Interest on the true-up is computed in Column H. Any adjustments to prior period true-ups are entered in Col. \nI.  Col. J computes the total true-up as the sum of Col. G, H and I.\nProjected True-Up Year Revenue \nRequirement Calculation\nTrue-Up Year \nRevenue Received1\nActual True-Up \nYear Revenue Req.\nCAISO \nIdentification\nProject # Or \nOther \nIdentifier\nNet Revenue \nRequirement2\n% of Total \nRevenue  \nRequirement\nAllocation of \nRevenue Received     \n                                   \n                    (E, Line \n2) x (D)\nTrue-Up Net Revenue \nRequirement3\nNet Under/(Over) \nCollection   (F)-(E)\nTrue-Up Interest \nIncome (Expense)4 \n(D) x (H, line 10)\nPrior Period \nAdjustment with \nInterest5\nTotal True-Up        \n(G) + (H) + (I)\nTotal Annual Revenue \nRequirements\nPrior Period Adjustment \n(Note 5)\nAdjustment \nAmount\nAttachment \n11\nInterest due on the true up is calculated for the 24 month period from the start of the true-up year until the end of the year following the true-up year when the true up will be included in rates. Total True up Interest calculate on \nAttachment 6 and allocated to projects based on the percentage in Column D."},{"page":475,"startToken":166433,"endToken":166762,"text":"Page 1 of 2\nFor the twelve months ended 12/31/__\nAttachment 4\nRate Base Worksheet\nDesertLink, LLC\nGross Plant in Service\nCWIP\nLHFFU\nWorking Capital\nAccumulated Depreciation\nMonth\nTransmission\nCWIP in Rate Base\nHeld for Future Use\nMaterials & Supplies\nPrepayments\nTransmission\n(a)\n(b)\n(c) \n(d)\n(e) \n(f)\n(g)\n(h)\n(i)\n(Note A)\n1\nDecember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n2\nJanuary\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n3\nFebruary\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n4\nMarch\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n5\nApril\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n6\nMay\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n7\nJune\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n8\nJuly\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n9\nAugust\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n10\nSeptember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n11\nOctober\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n12\nNovember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n13\nDecember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n14\n                             -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \nAdjustments to Rate Base\nMonth\n(a)\n(b)\n(c) \n(d)\n(e) \n(f)\n(g)\n(h)\n(Note A)\nNote C\nNote D\n272.8.b & 273.8.k\n274.2.b & 275.2.k\n276.9.b & 277.9.k\n234.8.b & c\n15\nDecember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -   \n16\nJanuary\n                   -                                -                                -   \n                                 -   \n17\nFebruary\n                   -                                -                                -   \n                                 -   \n18\nMarch\n                   -                                -                                -   \n                                 -   \n19\nApril\n                   -                                -                                -   \n                                 -   \n20\nMay\n                   -                                -                                -   \n                                 -   \n21\nJune\n                   -                                -                                -   \n                                 -   \n22\nJuly\n                   -                                -                                -   \n                                 -   \n23\nAugust\n                   -                                -                                -   \n                                 -   \n24\nSeptember\n                   -                                -                                -   \n                                 -   \n25\nOctober\n                   -                                -                                -   \n                                 -   \n26\nNovember\n                   -                                -                                -   \n                                 -   \n27\nDecember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -   \n28\n                             -                                -                                  -                                       -                                      -                                      -                                    -   \nLine \nNo\nGeneral & \nIntangible\nGeneral & Intangible\n207.58.g less \n207.57.g for end of \nyear, records for \nother months\n205.5.g & 207.99.g \nless 207.98.g for \nend of year, records \nfor other months\nNote B - page 2, \ncolumn C\n214.47.d for end of \nyear, records for other \nmonths\n227.8.c & 227.16.c for \nend of year, records for \nother months\n111.57.c for end of \nyear, records for other \nmonths\n219.25.c less ARO for \nend of year, records \nfor other months\n219.28.c & 200.21.c \nless ARO for end of \nyear, records for other \nmonths\nAverage of the 13 \nMonthly Balances\nUnamortized \nRegulatory Asset\nUnamortized \nAbandoned Plant\nAccount No. 281 \nAccumulated \nDeferred Income \nTaxes (Note E)\nAccount No. 282 \nAccumulated Deferred \nIncome Taxes (Note E)\nAccount No. 283 \nAccumulated Deferred \nIncome Taxes (Note E)\nAccount No. 190 \nAccumulated \nDeferred Income \nTaxes (Note E)\nAccount No. 255 \nAccumulated \nDeferred Investment \nCredit (Note I)\nConsistent with \n266.8.b & 267.8.h\nAverage of the 13 \nMonthly Balances"},{"page":476,"startToken":166762,"endToken":167468,"text":"Page 2 of 2\nFor the twelve months ended 12/31/\nAttachment 4\nRate Base Worksheet\nDesertLink, LLC\nTotal CWIP\n(a)\n(b)\n(c) = (a) - (b)\nCompany records\n29\nDecember\n                   -                                -                                -                                  -   \n30\nJanuary\n                   -                                -                                -                                  -   \n31\nFebruary\n                   -                                -                                -                                  -   \n32\nMarch\n                   -                                -                                -                                  -   \n33\nApril\n                   -                                -                                -                                  -   \n34\nMay\n                   -                                -                                -                                  -   \n35\nJune\n                   -                                -                                -                                  -   \n36\nJuly\n                   -                                -                                -                                  -   \n37\nAugust\n                   -                                -                                -                                  -   \n38\nSeptember\n                   -                                -                                -                                  -   \n39\nOctober\n                   -                                -                                -                                  -   \n40\nNovember\n                   -                                -                                -                                  -   \n41\nDecember\n                   -                                -                                -                                  -   \n                             -                                -                                  -   \nUnfunded Reserves   (Notes A and F and G)\n(a)\n(b)\n(b.i)\n(b.ii)\n(c) \n(d)\n(e) \n(f)\n(g)\n(h)\nList of all reserves\nAmount\n42a\nReserve 1\n -\n -\n                               -   \n -\n -\n -\n                                 -                                    -   \n42b\nReserve 2\n -\n -\n                               -   \n -\n -\n -\n                                 -                                    -   \n43\nTotal\n                               -   \n                                 -   \nNotes:\nA\nCalculate using 13 month average balance, except ADIT which is calculated based on the average of the beginning of the year and the end of the year balances\nB\nC\nD\nRecovery of abandoned plant is limited to any abandoned plant recovery authorized by FERC.\nE\nADIT is computed using the average of the beginning of the year and the end of the year balances. Electric ADIT only, Excludes ARO-related ADIT.\nF\nG\nH\nI\nBalance of Account 255 will be reduced by prior flow throughs and excluded if the utility chooses to utilize amortization of tax credits against taxable income.\nReconciliation of CWIP in Rate Base to FERC Form 1 - Note B\nLess: CWIP and \nAFUDC Excluded \nfrom Rate Base\nCWIP allowed in \nRate Base\n216.b for end of \nyear, records for \nother months\nAverage of the 13 \nMonthly Balances\nFERC balance sheet \naccount where \nreserves are \nrecorded \nFERC income \nstatement account \nwhere expenses are \nrecorded\nEnter 1 if NOT in a \ntrust or reserved \naccount, enter zero (0) \nif included in a trust or \nreserved account\nEnter 1 if the accrual \naccount is included in \nthe formula rate, enter \n(0) if the accrual \naccount is NOT \nincluded in the formula \nrate\nEnter the percentage \npaid for by customers \nless the percent \nassociated with an \noffsetting liability on \nthe balance sheet (Note \nH)\nAllocation (Plant or \nLabor Allocator)\nAmount Allocated, \ncol. c x col. d x col. e \nx col. f x col. g\nRecovery of CWIP in rate base must be approved by FERC.  Lines 29-41 of page 2 provide a reconciliation of the Company's total CWIP to the CWIP allowed in rate base. The annual report filed pursuant to the Protocols \nwill include for each project under construction (i) the CWIP balance eligible for inclusion in rate base; (ii) the CWIP balance ineligible for inclusion in rate base; and (iii) a demonstration that AFUDC is only applied to \nthe CWIP balance that is not included in rate base The annual report will also describe the reconciliation prepared on this Attachment\nRecovery of a Regulatory Asset is permitted only for pre-commercial and formation expenses, and is subject to FERC approval before the amortization of the Regulatory Asset can be included in rates. Recovery of any \nother regulatory assets requires authorization from the Commission.\nThe Formula Rate shall include a credit to rate base for all unfunded reserves (funds collected from customers that (1) have not been set aside in a trust, escrow or restricted account; (2) whose balance are collected from \ncustomers through cost accruals to accounts that are recovered under the Formula Rate; and (3) exclude the portion of any balance offset by a balance sheet ac count (see Note H)).  Each unfunded reserve will be included \non lines 42 above. The allocator in Col. (g) will be the same allocator used in the formula for the cost accruals to the account that is recovered under the Formula Rate.  Since reserves can be created by creating an \noffsetting balance sheet account, rather than through cost accruals, the amount to be deducted from rate base should exclude the portion offset by another balance sheet account.\nNot all unfunded reserves are created only from contributions from customers. Many are created by creating an offsetting liability in whole or in part.  Column (f) ensures only the portion of the unfunded reserve \ncontributed by the customer (and not created by an offsetting liability) is a reduction to rate base.\nThe inputs in Column (f) are the percentage of the unfunded reserve that was created by an offsetting liability. The percentage shown in Column (f) is then equal to the percentage that customers have contributed to the \nunfunded reserve."},{"page":477,"startToken":167468,"endToken":167845,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 5\nReturn on Rate Base Worksheet\nDesertLink, LLC\nRETURN ON RATE BASE ( R )\n$\n1\nLong Term Interest (117, sum of 62.c through 67.c) (Note D)\n                                -   \n2\nPreferred Dividends (118.29c) (positive number)\n                                -   \n3\nProprietary Capital (Line 25 (c))\n                                -   \n4\nLess Preferred Stock (Line 9) \n                                -   \n5\nLess Account 216.1 Undistributed Subsidiary Earnings (Line 25 (d))     \n                                -   \n6\nLess Account 219 Accum. Other Comprehensive Income (Line 25 (e))        \n                                -   \n7\nCommon Stock\n(Sum of Lines 3 through 6)   \n                                -   \n$\n%\nCost\nWeighted\n8\nLong Term Debt\nLine 25 (a), Note A and Appendix III Note Q\n                                -   \n50.00%\n0.000%\n0.00%\n=WCLTD\n9\nPreferred Stock\nLine 25 (b), Note B and Appendix III Note Q\n                                -   \n0.00%\n0.00%\n0.00%\n10\nCommon Stock\nLine 7, Note C  and Appendix III Notes Q and T\n                                -   \n50.00%\n9.80%\n4.900%\n11\nTotal\n(Sum of Lines 8 through 10)\n                                -   \n4.90%\n=R\n(a)\n(b)\n( c ) \n(d) \n( e ) \nMonthly Balances for Capital Structure\n12\nDecember (Prior Year)\n                               -                                 -                             -                                   -                                 -   \n13\nJanuary\n                               -                                 -                             -                                   -                                 -   \n14\nFebruary\n                               -                                 -                             -                                   -                                 -   \n15\nMarch\n                               -                                 -                             -                                   -                                 -   \n16\nApril\n                               -                                 -                             -                                   -                                 -   \n17\nMay\n                               -                                 -                             -                                   -                                 -   \n18\nJune\n                               -                                 -                             -                                   -                                 -   \n19\nJuly\n                               -                                 -                             -                                   -                                 -   \n20\nAugust\n                               -                                 -                             -                                   -                                 -   \n21\nSeptember\n                               -                                 -                             -                                   -                                 -   \n22\nOctober\n                               -                                 -                             -                                   -                                 -   \n23\nNovember\n                               -                                 -                             -                                   -                                 -   \n24\nDecember\n                               -                                 -                             -                                   -                                 -   \n25\n13-Month Average\n                               -                                 -                             -                                   -                                 -   \nNotes\nA\nB\nPreferred Stock balance will reflect the 13 month average of the balances, of which the 1st and 13th are found on page 112 line 3.c in the Form No. 1\nC\nCommon Stock balance will reflect the 13 month average of the balances, of which the 1st and 13th are found on Form 1 page 112 line 16.c less lines 3.c , 12.c, and 15.c\nD\nLong-term interest will exclude any short-term interest included in FERC Account 430, Interest on Debt to Associated Companies\nLong Term Debt \n(Note A)\nPreferred Stock \n(112.3.c)\nProprietary \nCapital (112.16.c)\nUndistributed Sub \nEarnings 216.1 \n(112.12.c)\nAccum Other Comp. \nIncome 219 \n(112.15.c)\nLong Term debt balance will reflect the 13 month average of the balances, of which the 1st and 13th are found on page 112, lines 18.c to 21.c, in the Form No. 1; the cost is calculated by \ndividing line 1 by the Long Term Debt balance on line 8."},{"page":478,"startToken":167845,"endToken":168194,"text":"Page 1 of 1\nFor the twelve months ended 12/31/\nAttachment 6\nInterest on True-Up\nDesertLink, LLC\nAppendix III K23\nLine\nRate Year\nRate Year\nProjected Revenue Requirement (Note A)\n1\n                                                                                         -   \nLess\n $                             -   \nEquals\n $                        -   \nNote A - Projected ATRR for the true-up year from Page 1, Line 1 of Projection Appendix III minus Line 6 of Projection Appendix III.\nNote B - Actual Net ATRR for the true-up year from Page 1, Line 9 of True-Up Appendix III.\nInterest Rate on Amount of Refunds or Surcharges\nMonths\nAmortization\n2\n0.000%\nAn over or under collection will be recovered pro rata over year collected, held for one year and returned pro rata over next year\nMonthly\n3\nJanuary\nRate Year\n                                -   \n0.000%\n12\n                          -   \n                              -   \n4\nFebruary\nRate Year\n                                -   \n0.000%\n11\n                          -   \n                              -   \n5\nMarch\nRate Year\n                                -   \n0.000%\n10\n                          -   \n                              -   \n6\nApril\nRate Year\n                                -   \n0.000%\n9\n                          -   \n                              -   \n7\nMay\nRate Year\n                                -   \n0.000%\n8\n                          -   \n                              -   \n8\nJune\nRate Year\n                                -   \n0.000%\n7\n                          -   \n                              -   \n9\nJuly\nRate Year\n                                -   \n0.000%\n6\n                          -   \n                              -   \n10\nAugust\nRate Year\n                                -   \n0.000%\n5\n                          -   \n                              -   \n11\nSeptember\nRate Year\n                                -   \n0.000%\n4\n                          -   \n                              -   \n12\nOctober\nRate Year\n                                -   \n0.000%\n3\n                          -   \n                              -   \n13\nNovember\nRate Year\n                                -   \n0.000%\n2\n                          -   \n                              -   \n14\nDecember\nRate Year\n                                -   \n0.000%\n1\n                          -   \n                              -   \n15\n                          -   \n                              -   \nAnnual\n16\nJanuary through December\nRate Yr. + 1                                 -   \n0.000%\n12\n                          -   \n                              -   \nOver (Under) Recovery Plus Interest Amortized and Recovered Over 12 Months\nMonthly\n17\nJanuary\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n18\nFebruary\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n19\nMarch\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n20\nApril\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n21\nMay\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n22\nJune\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n23\nJuly\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n24\nAugust\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n25\nSeptember\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n26\nOctober\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n27\nNovember\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n28\nDecember\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n29\n                          -   \n30\nTotal Amount of True-Up Adjustment\n $                           -   \n31\nLess Over (Under) Recovery\n $                        -   \n32\nTotal Interest\n $                           -   \nActual Net Revenue \nRequirement (Note B)\nOver (Under) \nRecovery\nOver (Under) \nRecovery Plus \nInterest\nMonthly Interest \nRate on Attachment \n6a\nCalculated \nInterest\nSurcharge (Refund) \nOwed\nCalculation of Interest"},{"page":479,"startToken":168194,"endToken":168356,"text":"Page 1 of 1\nFor the twelve months ended 12/31/\nAttachment 6a\nTrue-Up Interest Rate Calculator\nDesertLink, LLC\nThis Attachment is used to compute the interest rate to be applied to each year's revenue requirement true-up.\nApplicable FERC Interest Rate (Note A):\n1\nRate Year January\n0.00%\n2\nRate Year February\n-\n3\nRate Year March\n-\n4\nRate Year April\n-\n5\nRate Year May\n-\n6\nRate Year June\n-\n7\nRate Year July\n-\n8\nRate Year August\n-\n9\nRate Year September\n-\n10\nRate Year October\n-\n11\nRate Year November\n-\n12\nRate Year December\n-\n13\nRate Year Plus 1  January\n-\n14\nRate Year Plus 1  February\n-\n15\nRate Year Plus 1  March\n-\n16\nRate Year Plus 1  April\n-\n17\nRate Year Plus 1  May\n-\n18\nAverage Rate\n0.00%\n19\nMonthly Average Rate\n0.00%\nNote A - Lines 1-17 are the FERC interest rates under section 35.19a of the regulations for the period shown. Line 18 is the average of lines 1-17."},{"page":480,"startToken":168356,"endToken":168625,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 7\nWeighted Average Federal and State Income Tax Rates\nDesertLink, LLC\nSubchapter C\nMutual\nPensions, IRAs\nUBTI\nNon-Taxpaying\nWeighted \nLine\nDescription\nSource\nCorporations\nIndividuals\nFunds\nKeogh Plans\nEntities\nEntities\nAverage\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n1\nWeighted Marginal Federal Income Tax Rate\nNote A\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n2\nAllocated Income Percentage\nNote B\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n3\nWeighted Average \nLine 1 x Line 2\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n4\nWeighted Average Federal Income Tax Rate \nSum of Line 3, Col. (c)-(h)\n0.00%\n5\nWeighted Marginal State Income Tax Rate\nNote C\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n6\nAllocated Income Percentage\nNote B\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n7\nWeighted Average \nLine 5 x Line 6\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n8\nWeighted Average State Income Tax Rate\nSum of Line 7, Col. (c)-(h)\n0.00%\nA\nFor each Rate Year, DesertLink will develop a schedule calculating the weighted average federal income tax rate for each category of partners. \nB\nThis percentage is developed based on the distributive income allocated to each category of partners rather than their respective ownership percentages.\nC\nFor each Rate Year, DesertLink will develop a schedule calculating the weighted average state income tax rate for each category of partners."},{"page":481,"startToken":168625,"endToken":169209,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 8\nCost of Debt Prior to Issuing Non-Construction Financing\nDesertLink, LLC\nThis Attachment 8 is to be utilized to determine the cost of debt prior to issuing non-construction financing.  Once non-construction financing is issued the cost of debt shall be determined using the methodology described in Note Q on Appendix III.\nIf construction debt has not or will not be issued when construction starts, a proxy rate will be used for the cost of debt, which will be supported in the initial section 205 filing. The proxy rate will be entered on line 36 of this attachment.\nIf construction financing is obtained, all rates, fees and monthly debt balances will be subject to true up pursuant to Attachment 9.\nAny hypothetical amounts in a filed template will be removed and replaced with actual amounts in the first year actual construction loans are borrowed or projected to be borrowed without the need for a section 205 filing to modify the template.\nLine No\n1\nInterest rate on Construction Debt for Rate Year - Line 19 (g)\n0.00%\n2\nRate Year Debt Fee expense - Line 35 (e)\n0.00%\n3\nTotal Cost of Debt - Sum of Lines 1 and 2\n0.0000%\nInterest Rate Information\n4\nCommitment Fee Rate (%)\n5\nProjected Average Drawn Rate for Rate Year (%) - Note A\nMonth During Rate Year\nTotal Loan Amount ($000)\nInterest Expense ($000)\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n6\nDecember Prior Year\n                            -                                         -                                          -                                          -   \n7\nJanuary\n                            -                                         -                                          -                                          -   \n8\nFebruary\n                            -                                         -                                          -                                          -   \n9\nMarch\n                            -                                         -                                          -                                          -   \n10\nApril\n                            -                                         -                                          -                                          -   \n11\nMay\n                            -                                         -                                          -                                          -   \n12\nJune\n                            -                                         -                                          -                                          -   \n13\nJuly\n                            -                                         -                                          -                                          -   \n14\nAugust\n                            -                                         -                                          -                                          -   \n15\nSeptember\n                            -                                         -                                          -                                          -   \n16\nOctober\n                            -                                         -                                          -                                          -   \n17\nNovember\n                            -                                         -                                          -                                          -   \n18\nDecember\n                            -                                         -                                          -                                          -   \n19\nAverage of the 13 Monthly Balances\n                            -   \n                                        -                                          -   \n0.00%\nExample Fee Calculation - All amounts represent actual rate year expenses.\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\nOrigination Fees           \nRate/Fees\nGross Fee Amount ($000)\nYear Fee Incurred\n20\nUnderwriting Discount\n0.00%\n -\n -\n21\nArrangement Fee\n0.00%\n -\n -\n22\nUpfront Fee\n0.00%\n -\n -\n23\nRating Agency Fee\n0.00%\n -\n -\n24\nLegal Fees\n0.00%\n -\n -\n25\nOther\n0.00%\n -\n -\n26\n   Total Issuance Expense / Origination Fees - Sum of Lines 20-25\n -\n -\n -\n -\n27\n28\nAnnual Fees\n29\nAnnual Rating Agency Fee\n0.00%\nN/A\n -\nN/A\nN/A\n30\nAnnual Bank Agency Fee\n0.00%\nN/A                                      -   \nN/A\nN/A\n31\nUtilization Fee\n0.00%\nN/A\n -\nN/A\nN/A\n32\nOther Fees\n0.00%\nN/A\n -\nN/A\nN/A\n33\nTotal Fees\n -\n -\n -\n -\n34\n13 Month Average Debt balance - Line 19 (c)\n                                        -   \n35\nRate Year cost of fees\n0.00%\n36\nProxy Debt rate. Used prior to issuance of construction financing and supported in initial section 205 filing.\n3.2220%\nNotes\nA\nLIBOR\n0.0000%\nSpread\n2.3500%\nTotal\n2.3500%\nIf construction financing has been obtained, the cost of debt prior the issuance of non-construction financing shall be based on the terms of the construction financing and determined below. Up-front fees including origination fees will be amortized and \nincluded in the cost of debt.\nPrincipal Drawn \n($000)\nUnutilized Loan \nBalance ($000)\nCommitment Fee & \nUtilization Fee ($000)\nEffective Annual \nInterest Rate (%)\nFee Amortization Period \n(years)\nRate Year Amortized Fee \nAmount, col. b / col. d\nPrior Years Accumulated \nFee Amortization\nUnamortized Balance \n- End of Rate Year\nProjected rate will be Average LIBOR for rate year + spread. Spread will be supported in initial section 205 filing. LIBOR will be updated based on information in the Wall Street Journal as of the 15th day of the month prior to population of this \ntemplate."},{"page":482,"startToken":169209,"endToken":169565,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 9\nTrue-Up - Construction Financing Cost of Debt\nDesertLink, LLC\nOne time up-front debt fees, including origination fees will be amortized and included in the cost of debt.\nLine No.\n$\n1\nLong Term Interest and Fees (117, sum of 62.c through 67.c) -- Notes A and B\n                                    -   \n2\nLine of Credit Fees (68.c) -- Note C\n                                    -   \n3\nTotal Interest and Fees\n                                    -   \n13 Month Average Long-Term Debt - Notes A and D\nMonth During Rate Year\nLong Term Debt\n(a)\n(d)\n4\nDecember Prior Year\n                                    -   \n5\nJanuary\n                                    -   \n6\nFebruary\n                                    -   \n7\nMarch\n                                    -   \n8\nApril\n                                    -   \n9\nMay\n                                    -   \n10\nJune\n                                    -   \n11\nJuly\n                                    -   \n12\nAugust\n                                    -   \n13\nSeptember\n                                    -   \n14\nOctober\n                                    -   \n15\nNovember\n                                    -   \n16\nDecember\n                                    -   \n17\nAverage of the 13 Monthly Balances\n                                    -   \n18\nTrue-Up Cost of Debt (Line 3 / Line 17)\n0.00%\nNotes\nA\nB\nLong-term interest will exclude any short-term interest included in FERC Account 430, Interest on Debt to Associated Companies.\nC\nLine of credit fees will include only those related to long-term debt and not for short-term debt.\nD\nLong-term debt will exclude any short-term debt included in FERC Account 233, Notes Payable to Associated Companies.\nThis Attachment 9 is to be utilized only in the event construction financing has been obtained to compute the actual cost of debt to be included in the return on rate base calculation for the true-up each year prior to the \nissuance of non-construction financing. Once non-construction financing has been obtained the cost of debt shall be determined using the methodology described in Note Q on Appendix III.\nAny hypothetical amounts in a filed template will be removed and replaced with actual amounts in the first year actual construction loans are borrowed or projected to be borrowed without the need for a section 205 \nfiling to modify the template.\nLong Term debt balance will reflect the 13 month average of the balances, of which the 1st and 13th are found on page 112, line 24, columns d and c, respectively, in the Form No. 1; the cost is calculated by \ndividing line 1 by the Long Term Debt balance on line 8."},{"page":483,"startToken":169565,"endToken":169799,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 10\nDepreciation Rates\nDesertLink, LLC\nTRANSMISSION AND GENERAL PLANT DEPRECIATION RATES\nAnnual Depreciation Rates\nLine No.\n(Note A)\nINTANGIBLE PLANT\n1\n303.1\nContributions in Aid of Construction\nNote B\n2\n303.2\nInterconnections\n2.27% \n3\n303.3\nLicenses\n1.59%\nTRANSMISSION PLANT\n4\n350.2\nLand Rights\n1.43%\n5\n351.1\nComputer Hardware\n20.00%\n6\n352.0\nStructures & Improvements\n1.95%\n7\n353.0\nStation Equipment\n2.58%\n8\n354.0\nTowers & Fixtures\n1.86%\n9\n355.0\nPoles & Fixtures\n2.17%\n10\n356.0\nOverhead Conductors & Devices\n2.01%\n11\n392.0\nTransportation Equipment\n10.00%\n12\n393.0\nStores Equipment\n6.67%\n13\n394.0\nTools, Shop, and Garage Equipment\n12.50%\n14\n397.2\nComputer Software\n11.64%\nNotes\nA\nThese depreciation rates will not be changed absent a FERC order.\nB\nGENERAL PLANT\nIn the event a Contribution in Aid of Construction (CIAC) is made for a transmission facility, the transmission depreciation rates above will be \nweighted based on the relative amount of underlying plant booked to the accounts shown in lines 4-12 above, and the resultant weighted average \ndepreciation rate will be used to amortize the CIAC.   The CIAC depreciation rate for each facility will be determined at the time the plant is \nplaced into service, and will not change  without FERC approval."},{"page":484,"startToken":169799,"endToken":170037,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 11\nPrior Period Adjustments\nDesertLink, LLC\n(a)\n(b)\nCalendar Year\nLine No. Description\nSource\nRevenue Impact of Correction\nRevenue Requirement\n1\nFiling Name and Date\n                                                        -   \n2\nOriginal Revenue Requirement\n                                                              -   \n3\n4\nDescription of Correction 1\n                                                              -   \n5\nDescription of Correction 2\n                                                              -   \n6\n7\nTotal Corrections\nLine 4 + 5\n                                                              -   \n8\n9\nCorrected Revenue Requirement\nLine 2 + 7\n                                                              -   \n10\n11\n12\nTotal Corrections\nLine 7\n                                                              -   \n13\n14\nAverage Monthly FERC Refund Rate\nNote A\n0.00%\n15\nNumber of Months of Interest\nNote B\n30\n16\nInterest on Correction\nLine 12 x 14 x 15\n                                                              -   \n17\n18\nTotal Annual Amount Due from / (to) Customers\nLine 12 + 16\n                                                              -   \nNotes\nA\nB\nThe interest rate on corrections will be the average monthly FERC interest rate for the period from the beginning of the year being corrected through the most recent  month available as of \nthe time the correction is computed and included in an annual filing.\nThe number of months interest due on the correction will be the number of months from the beginning of the year being corrected through June of the year in which the correction will be \nreflected in rates. In this manner the interest computed will reflect all years prior to when the correction is reflected in rates plus interest on the average unrefunded balance of the \ncorrection during the year the correction is reflected in rates."},{"page":485,"startToken":170037,"endToken":170249,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 12\nRevenue Credit Detail\nDesertLink, LLC\n(a)\n(b)\n(c) = (a) - (b)\nLine No.\n(Note A)\nSource\nCompany Total\nLess: Non Transmission\nTransmission-related\n1\nAccount 454 - Rent from Electric Property\n2\nJoint pole attachments - telephone\nCompany books\n                                          -                                                      -                                                                                                                 -   \n3\nJoint pole attachments - cable\nCompany books\n                                          -                                                      -                                                                                                                 -   \n4\nUnderground rentals\nCompany books\n                                          -                                                      -                                                                                                                 -   \n5\nTransmission tower wireless rentals\nCompany books\n                                          -                                                      -                                                                                                                 -   \n6\nOther rentals\nCompany books\n                                          -                                                      -                                                                                                                 -   \n7\nOther rentals\nCompany books\n                                          -                                                      -                                                                                                                 -   \n8\nAccount 454 Revenue Credit\nForm 1 300.19.b\n                                          -                                                      -                                                                                                                 -   \n9\nAccount 456.1 Other Operating Revenues\n10\nCAISO NITS\nCompany books\n                                          -                                                      -                                                                                                                 -   \n11\nCAISO Point to Point\nCompany books\n                                          -                                                      -                                                                                                                 -   \n12\nOver/Under recovery deferral\nCompany books\n                                          -                                                      -                                                                                                                 -   \n13\nOther Transmission Service Revenues\nCompany books\n                                          -                                                      -                                                                                                                 -   \n14\nOther\nCompany books\n                                          -                                                      -                                                                                                                 -   \n15\nTotal Per Books\nForm 1 330.n\n                                          -                                                      -                                                                                                                 -   \n16\nLess: revenues received pursuant to this Formula Rate\n                                          -                                                      -                                                                                                                 -   \n17\nLess: Over/Under recovery deferral\n                                          -                                                      -                                                                                                                 -   \n17a\nLess: Revenue Credits included in the TRBAA\n                                          -                                                      -                                                                                                                 -   \n18\nAccount 456.1 Revenue Credit\n                                          -                                                      -                                                                                                                 -   \n19\nTotal Revenue Credits\n(Line 8 + line 18)\n                                          -                                                      -                                                                                                                 -   \nNote A\nAll 454 and 456.1 revenues will be detailed from Company books and records or FERC Form 1, and additional rows added if necessary.  Non-transmission-related amounts will be deducted to determine transmission-related amounts.\n(Line 15 - line 16 - line 17 \n- line 17a)"},{"page":486,"startToken":170249,"endToken":170671,"text":"DesertLink, LLC\nAttachment 13 - Excess or Deficient Accumulated Deferred Income Taxes - Summary\n[Year] \n[Projected or Actual]\nLine No. \n1\n2\n[List of tax law changes, accounting treatment, and asscociated explanatory notes.]\n3\nRate Base Adjustment Mechanism - Summary\n4\nAccount\nAmount\nReferences\n5\n182.3 (debit or <credit>)\n                        -   \n6\n254 (debit or <credit>)\n                        -   \n7\nTotal Deficient or (Excess) ADIT (sum of lines 5-6)\n                        -   To Appendix III, Page 2, Line 22a, Col. (3)\n8\n9\nIncome Tax Allowance Adjustment Mechanism - Summary\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n10\n11\n[Insert rows as necessary]\n                        -   \n                        -   \n11a\n[Insert rows as necessary]\n                        -   \n                        -   \n11…\n[Insert rows as necessary]\n                        -   \n                        -   \n12\nTotal\n(sum of lines 11_)\n                        -   \n                        -   \n13\n14\n[Explanatory statements as needed]  \nThe primary purposes of this worksheet are to: \n - reconcile the amounts of regulatory assets and liabilities comprising the rate base adjustment mechanism on Appendix III, Page 2, Line 22a (ADJUSTMENTS TO RATE BASE > Deficient or (Excess) ADIT) as of the beginning and end of the current test \nperiod (summarized beginning at Line 3 below) and \n- to support the amount of excess deferred tax expense or benefit recognized due to enacted change(s) in tax rate(s) on Appendix III, Page 3, Line 40 (INCOME TAXES > Deficient or (Excess) Deferred Income Taxes) and the effect of such excess deferred \ntax expense or benefit on the revenue requirement as reflected in the income tax allowance adjustment mechanism on Appendix III, Page 3, Line 44 (INCOME TAXES > Deficient or (Excess) Deferred Income Tax Adjustment) during the test period \n(summarized beginning on Line 9 below).  \nThis worksheet supports the computation of the projected revenue requirement or, as appropriate, the actual revenue requirement used to compute the true-up adjustment.\nEach tax law change addressed by this worksheet with its associated explanatory note is listed below.  Amounts related to each tax law change are provided and supported throughout this worksheet.  Additional lines and explanatory notes will be added to \nthis worksheet as necessary as tax law changes are enacted without the need for an FPA Section 205 filing. \nThe amounts summarized above are computed in the Rate Base Adjustment Mechanism-Reconciliation of Beginning and End of Test Period Balances section of the worksheet with proration and averaging of activity during the test period computed in \ndifferent section of Attachment 13.1 for projected revenue requirement calculations and actual revenue requirement calculations.\n Amortization or \nMitigation of \nDeficient or \n<Excess> ADIT \n Tax Gross-up \nFactor \n Amortization or \nMitigation with \nTax Gross-up \n To Appendix III, \nPage 3, Line 40, \nCol. (3) \n To Appendix III, \nPage 3, Line 44, \nCol. (3)"},{"page":487,"startToken":170671,"endToken":171169,"text":"15\nRate Base Adjustment Mechanism - Reconciliation of Beginning and End of Test Period Balances\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n(j)\n16\nDescription (+ = debit, <> = credit)\nAmortization period and method\n17\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n17a\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n17b\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n17...\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n18\nTotal for account 182.3\n(sum of lines 17_)\n                        -                           -                           -                           -                           -   \n19\n FN1. pg 232 \n FN1. pg 232 \n20\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n20a\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n20b\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n20...\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n21\nTotal for account 254\n(sum of lines 20_)\n                        -                           -                           -                           -                           -   \n22\n FN1. pg 278 \n FN1. pg 278 \n23\n24\nIncome Tax Allowance Adjustment Mechanism\n25\n26\nAmortization of Excess or Deficient ADIT\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n(j)\n27\nDescription (+ = debit, <> = credit)\nComments\n28\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n28a\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n28b\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n28...\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n29\nTotal for account 182.3\n(sum of lines 28_)\n                        -                           -                           -                           -                            -   \n30\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n30a\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n30b\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n30...\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n31\nTotal for account 254 \n(sum of lines 30_)\n                        -                           -                           -                           -                            -   \n32\nTotal amortization and offsetting entries\n(sum of lines 29 & 31)                         -                           -                           -                           -                            -   \n33\nNet income tax expense or benefit\n(sum of lines 32(f) & 32(g))\n                        -   \n To line 11 \nBalance at \nBeginning of \nYear\nRe-\nmeasurement of \nADIT\nAnnual \nAmortization \n(Note 4)\nOther \nAdjustments\n(Note 5)\nBalance at End \nof Year \n(d)+(e)+(f)+\n(g)\nWhether subject \nto normalization \nrules\n(Note 6)\nAnalysis - Balances of tax-related regulatory assets and liabilities include tax gross-up.  Accordingly, for the regulatory assets and liabilities for deficient or excess deferred taxes included in rate base, the related deferred tax assets and liabilities are also \nincluded in rate base.  Remeasurements in column (e) are described in Notes 2 and 3 and are based on the journal entry below and the support on the worksheet for the applicable tax law change.  Averaging or proration of amounts affecting rate base is \ncomputed on different sections of Attachment 13.1 for projected revenue requirement and actual revenue requirement. \nThe income tax allowance adjustment mechanism may include amortization of excess or deficient ADIT pertaining to deferred tax expense or benefit reflected in rates at a historical tax rate when the underlying timing difference(s) originated (computed \nunder Amortization of Excess or Deficient ADIT within the Income Tax Allowance Adjustment Mechanism section of this worksheet) as well as an adjustment for tax law changes with prospective effective dates intended to mitigate the over- or under-\nrecovery of deferred income taxes originating prior to the effective date of such tax law changes (computed under Adjustment for Tax Law Changes with Prospective Effective Dates within the Income Tax Allowance Adjustment Mechanism section of this \nworksheet).\nAnnual \nAmortization \nfrom Table \nAbove\n(Note 4)\nDebit or \n<Credit> to \nAccount 410.1\nDebit or \n<Credit> to \nAccount 411.1\nDebit or \n<Credit> to \nAccount 190\nDebit or \n<Credit> to \nAccount 283"},{"page":488,"startToken":171169,"endToken":171742,"text":"34\nAdjustment for Tax Law Changes with Prospective Effective Dates\n35\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n(j)\n(k)\n36\n37\n (c) x (d) \n1 / (1- (d))\n (e) x (f) \n - [(c) x (h)] \n (e) + (i) \n (j) x (f) \n38\n[Insert rows as necessary]\n                        -   \n                        -   \n                         -                           -                           -   \n To line 11 \n38…\n[Insert rows as necessary]\n                        -   \n                        -   \n                         -                           -                           -   \n To line 11 \n39\nNote 1 - Summary of re-measurement of ADIT resulting from tax law changes\n40\n41\nNote 1a - Summary of re-measurement of ADIT resulting from \n[name of tax law change]\nAdditional information is provided in Note \n42\nRe-measurement entry \n(a)\n(b)\n(c) \n43\nAccount\nComments or References\n44\n190\n45\n281\n46\n282\n47\n283\n48\n182.3 (tax-related, included in rate base - protected)\n49\n182.3 (tax-related, included in rate base - unprotected)\n50\n182.3 (tax-related, not in rate base))\n51\n190 (related to portion of acct. 182.3 not in rate base)\n52\n254 (tax-related, included in rate base - protected)\n53\n254 (tax-related, included in rate base - unprotected)\n54\n254 (tax-related, not in rate base)\n55\n283 (related to portion of acct. 254 not in rate base)\n56\nAccount 410.1\n57\nAccount 411.1\n58\nAccount 410.2\n59\nAccount 411.2\n60\nTotal\n (sum of lines \n                        -   \n61\n[Insert additional analysis.]\nIn the case of tax law changes with an effective date(s) after the beginning of the test period, the impact of a timing difference on current tax expense or benefit differs from the impact on ADIT.  For example, in the case \nof a deductible timing difference originating in a tax year with a higher enacted tax rate than will apply when the difference will reverse, the current tax benefit will exceed the deferred tax expense.  In this situation, the \nadjustment computed below to recoverable income tax expense is made in order to avoid over-recovering income tax expense in the current test period due to the excess of current tax benefit over deferred tax expense \n(computed based on the estimated amount of the future tax liability) with respect to a given timing difference.  The adjustment to recoverable tax expense during the test period in which a timing difference originates \nmitigates the need for refund of a regulatory liability for excess deferred taxes in a future period (or, as applicable, the need for recovery of a regulatory asset for deficient deferred taxes in a future period).  Amounts in \ncolumn (i) are reported in the Income Tax Allowance Adjustment Mechanism - Summary on this worksheet.\n Originating \nTaxable or \n(Deductible) \nBook / Tax \nDifference for \nTest Year \n Tax Rate for \nTest Year \n Current Tax \nExpense or \n(Benefit) in Test \nYear \n Tax Gross-up \nFactor for Test \nYear \n Revemue \nRequirement \nImapct for Test \nYear \n Enacted Tax \nRate for the \nReversal Year(s) \n Deferred Tax \nExpense or \n(Benefit) in Test \nYear \n Total Tax \nExpense or \n(Benefit) in Test \nYear \n Adjustment to \nMitigate \nOver/under-\nrecovery of \nDeferred Taxes  \nThe purposes of this portion of the worksheet are, for each change in tax law, to explain: \n- how any ADIT accounts were re-measured, \n- the excess or deficient ADIT contained therein, and \n- the accounting for any excess or deficient amounts in Accounts 182.3 (Other Regulatory Assets) and 254 (Other Regulatory Liabilities).\nNote 2 describes how ADIT accounts are re-measured upon a change in income tax law.  A separate summary (i.e., Note 1a, Note 1b, etc.) will be added for each tax law change resulting in a re-measurement of ADIT.\nDebit or \n<Credit>"},{"page":489,"startToken":171742,"endToken":172292,"text":"62\nNote 1b - Summary of \n[name of tax law change]\nAdditional information is provided in Note \n63\n[Insert additional analysis.]\n64\nNote 1b - Summary of \n[name of tax law change]\nAdditional information is provided in Note \n65\n66\n67\n68\n69\n[Continuation of note with respect to particular changes in tax law.]\n70\n[Insert additional notes as needed.]\nNote 2 - Explanation of how ADIT accounts are re-measured upon a change in income tax law\nDeferred tax assets and liabilities are adjusted (re-measured) for the effect of the changes in tax law (including tax rates) in the period that the change is enacted.  Adjustments are recorded in the appropriate deferred tax \nbalance sheet accounts (Accounts 190, 281, 282 and 283) based on the nature of the temporary difference and the related classification requirements of the accounts.   If as a result of action or expected action by a \nregulator, it is probable that the future increase or decrease in taxes payable due to the change in tax law or rates will be recovered from or returned to customers through future rates, a regulatory asset or liability is \nrecognized in Account 182.3 (Other Regulatory Assets), or Account 254 (Other Regulatory Liabilities), as appropriate, for that probable future revenue or reduction in future revenue.  Re-measurements of deferred tax \nbalance sheet accounts may also result in re-measurements of tax-related regulatory assets or liabilities that had been recorded prior to the change in tax law.  If it is not probable that the future increase or decrease in taxes \npayable due to the change in tax law or rates will be recovered from or returned to customers through future rates, tax expense is recognized in Account 410.2 (Provision for Deferred Income Taxes, Other Income or \nDeductions) or tax benefit is recognized in Account 411.2 (Provision for Deferred Income Taxes-Credit, Other Income or Deductions), as appropriate.  \nNote 3 - [Complete to support information above.]\nNote 4 - The amortization of the deficient or excess ADIT reducing Account 254 (Other Regulatory Liabilities) is recorded with credits to Account 411.1 (Provision for Deferred Income Taxes – Credit, Utility Operating \nIncome) and to Account 190 (Accumulated Deferred Income Taxes) or Account 283 (Accumulated Deferred Income Taxes—Other), as appropriate, in accordance with the Commission’s Accounting for Income Taxes \nGuidance.  The amortization of the deficient or excess ADIT reducing Account 182.3 (Other Regulatory Assets) is recorded with debits to Account 410.1 (Provision for Deferred Income Taxes, Utility Operating Income) \nand to Account 190 (Accumulated Deferred Income Taxes) or Account 283 (Accumulated Deferred Income Taxes—Other), as appropriate, in accordance with the Commission’s Accounting for Income Taxes Guidance.  \nThis activity is summarized in the table \"Income Tax Allowance Mechanism - Projected\" or the table \"Income Tax Allowance Mechanism - Actual,\" as appropriate.  The annual amortization in the tables above reflects tax \ngross-up and is stated at the revenue requirement level. \nNote 5 - [Complete to support information above.]\nNote 6 -  The worksheet indicates whether each excess or deficient ADIT amounts are protected (i.e., subject to normalization rules of a taxing jurisdiction) or unprotected (i.e., not subject to normalization rules of a taxing \njurisdiction).  To the extent that normalization requirements apply to ADIT remeasurements, additional computations (e.g., proration of excess deferred tax activity related to future test periods) may be necessary."},{"page":490,"startToken":172292,"endToken":172681,"text":"DesertLink, LLC\nAttachment 13.1 - Regulatory Assets/Liabilities for Deficient/Excess ADIT - Averaging and Proration Adjustments \nSupport for Attachment 13 (Excess or Deficient Accumulated Deferred Income Taxes - Summary)\n[Year] \n[Projected or Actual]\nLine No.\n1\nRate year =\n2\nTest period days after rates become effective\n3\n4\nAccount 182.3 - Other Regulatory Assets (portion related to deficient or excess ADIT)\n5\n6\nBeginning balance  (debit or <credit>)\n                        -   \n7\nLess:  Portion not related to transmission\n                        -   \n8\nLess:  Portion not reflected in rate base\n                        -   \n9\nSubtotal:  Portion reflected in rate base\n                        -   \n10\nLess:  Portion subject to proration\n                        -   \n11\nPortion subject to averaging  (debit or <credit>)\n                        -   \n12\nEnding balance  (debit or <credit>)\n                        -   \n13\nLess:  Portion not related to transmission\n                        -   \n14\nLess:  Portion not reflected in rate base\n                        -   \n15\nSubtotal:  Portion reflected in rate base\n                        -   \n16\nLess:  Portion subject to proration (before proration)\n                        -   \n17\nPortion subject to averaging (before averaging)  (debit or <credit>)\n                        -   \n18\nEnding balance of portion subject to proration (prorated)  (debit or <credit>)\n                        -   From Line 36(n)\n19\nAverage balance of portion subject to averaging\n                        -   \n20\nAmount reflected in rate base  (debit or <credit>)\n                        -   To Att. 13, Line 5\nThis attachment includes sections that are populated only with actual data and thus, these sections remain blank when the formula rate template is \ncalculating a projected revenue requirement. Columns (i) through (n) below are not used for the projection and are only populated with actual data for the \nAnnual Update.   \nNote 1 - The computations below apply the proration rules of Treasury Regulation section 1.167(l)-1(h)(6) to the annual activity of the portions of the \ndeficient or excess accumulated deferred income taxes recorded in account 182.3 or 254 that are subject to the normalization requirements.  Activity \nrelated to the portions of the account balances reflected in rate base but not subject to the proration requirement is averaged instead of prorated.  The \nbalances below include tax gross-up.  The corresponding portions of the deferred tax asset related to the portions of the regulatory liability and the \ncorresponding portions of the deferred tax liability related to the portions of the regulatory asset are also reflected in rate base and prorated or averaged, \nas appropriate.  Columns (a) through (h) are used for projected and actual revenue requirements computations.  Columns (i) through (n) are used for \nactual revenue requirement computations.   \nAmount\ndebit / <credit>"},{"page":491,"startToken":172681,"endToken":173079,"text":"21\nAccount 182.3 - Other Regulatory Assets (portion related to deficient or excess ADIT)\nColumns (i) through (n) are not used for the calculation of the projected revenue requirement\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n(j)\n(k)\n(l)\n(m)\n(n)\n22\nMonth\nYear\n23\n \nprior month (d) + (c)\nLine 2\n[(c) x (e) / (f)]\nprior month (h) + (g)\n[Note 5]\n[Note 6]\n[Note 7]\n24\nDecember 31,\n-\n NA                               -   \nNA\n0\n NA                               -   \n NA \n NA \n NA \n NA \n NA                              -   \n25\nJanuary \n-\n                              -                                 -   \n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n26\nFebruary\n-\n                              -                                 -   \n307\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n27\nMarch \n-\n                              -                                 -   \n276\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n28\nApril\n-\n                              -                                 -   \n246\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n29\nMay\n-\n                              -                                 -   \n215\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n30\nJune\n-\n                              -                                 -   \n185\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n31\nJuly\n-\n                              -                                 -   \n154\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n32\nAugust \n-\n                              -                                 -   \n123\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n33\nSeptember\n-\n                              -                                 -   \n93\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n34\nOctober\n-\n                              -                                 -   \n62\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n35\nNovember\n-\n                              -                                 -   \n32\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n36\nDecember\n-\n                              -                                 -   \n1\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n37\nTotal \n                              -   \n                             -                                -   \n38\n39\nAccount 254 - Other Regulatory Liabilities (portion related to deficient or excess ADIT)\n40\n41\nBeginning balance  (debit or <credit>)\n                        -   \n42\nLess:  Portion not related to transmission\n                        -   \n43\nLess:  Portion not reflected in rate base\n                        -   \n44\nSubtotal:  Portion reflected in rate base\n                        -   \n45\nLess:  Portion subject to proration\n                        -   \n46\nPortion subject to averaging  (debit or <credit>)\n                        -   \n47\nEnding balance  (debit or <credit>)\n                        -   \n48\nLess:  Portion not related to transmission\n                        -   \n49\nLess:  Portion not reflected in rate base\n                        -   \n50\nSubtotal:  Portion reflected in rate base\n                        -   \n51\nLess:  Portion subject to proration (before proration)\n                        -   \n52\nPortion subject to averaging (before averaging)  (debit or <credit>)\n                        -   \n53\nEnding balance of portion subject to proration (prorated)  (debit or <credit>)\n                        -   From Line 70(n)\n54\nAverage balance of portion subject to averaging\n                        -   \n55\nAmount reflected in rate base  (debit or <credit>)\n                        -   To Att. 13, Line 6\nForecasted Monthly \nActivity\ndebit / <credit>\nForecasted \nMonth-end Balance\ndebit / <credit>\nDays until \nEnd of Test \nPeriod\nDays in Test \nPeriod\nProrated Forecasted \nMonthly Activity\ndebit / <credit>\nForecasted  Prorated \nMonth-end Balance\ndebit / <credit>\nActual Monthly \nActivity\nDifference between \nprojected monthly \nand actual monthly \nactivity.\nPreserve projected \nproration when actual \nmonthly and projected \nmonthly activity are \neither both increases \nor decreases.  \nFifty percent of the \ndifference between \nprojected and actual \nactivity when actual \nand projected activity \nare either both \nincreases or \ndecreases.  \nFifty percent of actual \nmonthly activity when \nprojected activity is \nan increase while \nactual activity is a \ndecrease OR projected \nactivity is a decrease \nwhile actual activity is \nan increase.\nBalance reflecting \nproration or \naveraging \n(i) - (c) \n [Note 4]\n(k) + (l) + (m) \n[Note 8]\nNote 2 - \nAmount\ndebit / <credit>"},{"page":492,"startToken":173079,"endToken":173755,"text":"56\nAccount 254 - Other Regulatory Liabilities (portion related to deficient or excess ADIT)\nColumns (i) through (n) are not used for the calculation of the projected revenue requirement\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n(j)\n(k)\n(l)\n(m)\n(n)\n57\nMonth\nYear\n58\n \nprior month (d) + (c)\nLine 2\n[(c) x (e) / (f)]\nprior month (h) + (g)\n[Note 5]\n[Note 6]\n[Note 7]\n58\nDecember 31,\n-\n NA                               -   \nNA\n0\n NA                               -   \n NA \n NA \n NA \n NA                              -   \n59\nJanuary \n-\n                              -                                 -   \n0\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n60\nFebruary\n-\n                              -                                 -   \n307\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n61\nMarch \n-\n                              -                                 -   \n276\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n62\nApril\n-\n                              -                                 -   \n246\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n63\nMay\n-\n                              -                                 -   \n215\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n64\nJune\n-\n                              -                                 -   \n185\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n65\nJuly\n-\n                              -                                 -   \n154\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n66\nAugust \n-\n                              -                                 -   \n123\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n67\nSeptember\n-\n                              -                                 -   \n93\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n68\nOctober\n-\n                              -                                 -   \n62\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n69\nNovember\n-\n                              -                                 -   \n32\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n70\nDecember\n-\n                              -                                 -   \n1\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n71\nTotal \n                              -   \n                             -                                -   \n72\n73\n74\n75\n76\n77\nForecasted Monthly \nActivity\ndebit / <credit>\nForecasted \nMonth-end Balance\ndebit / <credit>\nDays until \nEnd of Test \nPeriod\nDays in Test \nPeriod\nProrated Forecasted \nMonthly Activity\ndebit / <credit>\nForecasted  Prorated \nMonth-end Balance\ndebit / <credit>\nActual Monthly \nActivity\nDifference between \nprojected monthly \nand actual monthly \nactivity.\nPreserve projected \nproration when actual \nmonthly and projected \nmonthly activity are \neither both increases \nor decreases.  \nFifty percent of the \ndifference between \nprojected and actual \nactivity when actual \nand projected activity \nare either both \nincreases or \ndecreases.  \nFifty percent of actual \nmonthly activity when \nprojected activity is \nan increase while \nactual activity is a \ndecrease OR projected \nactivity is a decrease \nwhile actual activity is \nan increase.\nBalance reflecting \nproration or \naveraging \n(i) - (c) \n [Note 4]\n(k) + (l) + (m) \n[Note 8]\nNote 3 - \nNote 4  -  Column J is the difference between actual monthly and projected monthly activity (Column I minus Column C).  Specifically, if projected and \nactual activity are both positive, a negative in Column J represents over-projection (i.e., the amount of projected activity that did not occur) and a \npositive in Column J represents under-projection (i.e., the excess of actual activity over projected activity). If projected and actual activity are both \nnegative, a negative in Column J represents under-projection (i.e., the excess of actual activity over projected activity) and a positive in Column J \nrepresents over-projection (i.e., the amount of projected activity that did not occur). \nNote 5  -  Column K preserves the effects of excess ADIT proration from the projected revenue requirement when actual monthly excess ADIT activity \nand projected monthly excess ADIT activity are either both increases or decreases.  Specifically, if Column J indicates that excess ADIT activity was \nover-projected, enter Column G x [Column I / Column C].  If Column J indicates that excess ADIT activity was under-projected, enter the amount from \nColumn G and complete Column L).  In other situations, enter zero.\nNote 6  -  Column L applies when (1) Column J indicates that excess ADIT activity was under-projected AND (2) actual monthly and projected monthly \nactivity are either both increases or both decreases.  Enter 50 percent of the amount from Column J.  In other situations, enter zero.  The excess ADIT \nactivity in column L is multiplied by 50 percent to reflect averaging of rate base to the extent that the proration requirement has not been applied to a \nportion of the monthly excess ADIT activity.\nNote 7  -  Column M applies when (1) projected monthly activity was an increase while actual monthly activity was a decrease OR (2) projected monthly \nactivity was a decrease while actual monthly activity was an increase.  Enter 50 percent of the amount of actual monthly activity (Column I).  In other \nsituations, enter zero.  The excess ADIT activity in column M is multiplied by 50 percent to reflect averaging of rate base to the extent that the proration \nrequirement has not been applied to a portion of the monthly excess ADIT activity.\nNote 8  -  Column N is computed by adding the balance at the end of the prior month to EITHER (1) the sum of prorated monthly excess ADIT activity, \nif any, from Column K and the portion of monthly excess ADIT activity, if any, from Column L OR (2) the portion of monthly excess ADIT activity in \nColumn M."},{"page":493,"startToken":173755,"endToken":174258,"text":"DesertLink, LLC\nAttachment 13.2 - Re-measurement of ADIT and Tax-related Regulatory Assets and Liabilities Resulting from the Tax Change Identified in Line 1\nSupport for Attachment 13 (Excess or Deficient Accumulated Deferred Income Taxes - Summary)\n[Year] \n[Projected or Actual]\nLine No.\n1\n[Identify/describe the tax legislation/change]\n2\n[Describe the computation.]\n3\n4\n(a)\n(b)\n(c) \n(d)\n(e) \n(f)\n(g)\n(h)\n(i)\n(j)\n(k)\n(l)\n(m)\n(n)\n5\nBalances and rates prior to remeasurement\n[tax rate]\n[tax rate]\n[tax rate]\n[1/(1-tax rate)]\n[tax rate]\n6\nTemporary Difference\nAccount\nAccount\nAccount\nAccount\nAccount\n7\nItem\nNormalized?\nAmount\n190\n282\n283\n182.3\n283\n8\n[Insert rows as necessary]\n8a\n[Insert rows as necessary]\n8b\n[Insert rows as necessary]\n8...\n[Insert rows as necessary]\n9\nTotal\n                     -                      -                      -                      -                      - \n10\nRemeasured balances and rates\nOther accounts affected by remeasurement\n11\n[tax rate]\n[tax rate]\n[tax rate]\n[1/(1-tax rate)]\n[tax rate]\n[1/(1-tax rate [tax rate] /(1-tax rate [tax rate]\n12\nTemporary Difference\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\n13\nItem\nNormalized?\nAmount\n190\n282\n283\n182.3\n283\n410.2\n411.2\n254\n190\n182.3\n283\n14\n[Insert rows as necessary]\n14a\n[Insert rows as necessary]\n14b\n[Insert rows as necessary]\n14...\n[Insert rows as necessary]\n15\nTotal\n                     -                      -                      -                      -                      - \n              -               -               -               -               -               - \n16\nRemeasurement journal entry:  debt or <credit> (to Attachment 13)\n                     -                      -                      -                      -                      - \n              -               -               -               -               -               - \n17\nSummary of Effects on Tax-related Regulatory Assets and Liabilities\n18\nAccount 182.3 - included in rate base, subject to normalization rules\n19\nAccount 182.3 - included in rate base, not subject to normalization rules\n20\nAccount 182.3 - not included in rate base\n21\nAccount 254 - included in rate base, subject to normalization rules\n22\nAccount 254 - included in rate base, not subject to normalization rules\n23\nAccount 254 - not included in rate base\nThe ratemaking treatment of each item in terms of whether it is subject to the normalization requirements (i.e., P or \"protected\") or not subject to the normalization requirements (i.e., U or \"unprotected\") \nand included in rate base or not (i.e., RB or non-RB) is indicated in column (b).  The balances are measured at the composite tax rate in effect immediately before effective date of the change in tax law and \nremeasured immediately after the change in tax law.  Each set of balances includes the appropriate income tax rates and tax gross-up factors (as computed in the specific note for this tax law change in Att. \n13).  The journal entry to record the remeasurements (Line 16) is based on the differences in balances of accounts recorded prior to the change in law (columns (d)-(h)) and activity in other accounts \nresulting from the remeasurement (columns (i)-(n)).  The remeasurement entry is also included in Att. 13.  The accounting is further described in Att. 13, Note 2. \nThis worksheet will be included in support of the revenue requirement computation until the excess or deficient ADIT is fully amortized.  A similar worksheet will be used for subsequent changes in tax \nlaw resulting in re-measurement of ADIT."},{"page":494,"startToken":174258,"endToken":174264,"text":"Ex. DLK-202 \n \nFormula Rate Template (Marked)"},{"page":495,"startToken":174264,"endToken":174394,"text":"Projected ATRR\nFor the 12 months ended\n12/31/__\nFormula Rate Index\nDesertLink, LLC\nTable of Contents\nFormula Rate Template\nAttachments:\nAttachment No\nWorksheet Name\n1\nProject Revenue Requirement Worksheet\n1a\nProject Plant Detail Worksheet\n2\nIncentive Return\n3\nFormula Rate True-Up\n4\nRate Base Worksheet\n5\nReturn on Rate Base Worksheet\n6\nInterest on True-Up\n6A\nTrue-Up Interest Rate Calculator\n7\nWeighted Average Federal and State Income Tax Rates\n8\nCost of Debt Prior to Issuing Non-Construction Financing\n9\nTrue-Up - Construction Financing Cost of Debt\n10\nDepreciation Rates\n11\nPrior Period Adjustments\n12\nRevenue Credit Detail\n13\nExcess or Deficient Accumulated Deferred Income Taxes - Summary\n13.1\nRegulatory Assets/Liabilities for Deficient/Excess ADIT - Averaging and Proration Adjustments \n13.2\nRe-measurement of ADIT and Tax-related Regulatory Assets and Liabilities"},{"page":496,"startToken":174394,"endToken":174548,"text":"Formula Rate - Non-Levelized\nPage 1 of 5\nRate Formula Template\nUtilizing FERC Form 1 Data\nDesertLink, LLC\nProjected ATRR\nFor the 12 months ended\n12/31/__\n(1)\n(2)\n(3)\n(4)\n(5)\nLine\nAllocated \nNo.\nSource\nAmount\n1\nGROSS REVENUE REQUIREMENT, without incentives\n(Page 3, Line 49)\n $                               -   \nREVENUE CREDITS\n(Note A)\nTotal\nAllocator (W)\n2\nAccount No. 454\n(Page 4, Line 20)\n                                                  -   \nTP\n         1.0000 \n $                               -   \n3\nAccount No. 456.1\n(Page 4, Line 21)\n                                                  -   \nTP\n         1.0000 \n $                               -   \n4\nRevenues from Grandfathered Interzonal Transactions\n(Note B)\n                                                  -   \nTP\n         1.0000 \n $                               -   \n5\nRevenues from service provided by the ISO at a discount\n                                                  -   \nTP\n         1.0000 \n $                               -   \n6\nTOTAL REVENUE CREDITS\n(Sum of Lines 2 through 5)\n                                                  -   \n $                               -   \n7\nPrior Period Adjustments\nAttachment 11, Line 18, Col. B\n                                                  -   \nDA\n         1.0000 \n $                               -   \n8\nTrue-up Adjustment with Interest\nAttachment 3, Line 9, Col. J\n                                                  -   \nDA\n         1.0000 \n $                               -   \n9\nNET ANNUAL TRANSMISSION REVENUE REQUIREMENT\n(Line 1 less Line 6 plus Lines 7 and 8)\n $                               -"},{"page":497,"startToken":174548,"endToken":175028,"text":"Page 2 of 5\nRate Formula Template\nUtilizing FERC Form 1 Data\nDesertLink, LLC\nFor the 12 months ended\n12/31/__\nLine\n(1)\n(2)\n(3)\n(4)\n(5)\nNo.\nRATE BASE: (Note R)\nSource\nCompany Total\nAllocator (W)\nTransmission\nGROSS PLANT IN SERVICE\nNote C\n(Col 3 times Col 4)\n1\nProduction\n205.46.g for end of year, records for other months\n                                                  -   \nN/A\n                 -   \n                                  -   \n2\nTransmission\nAttachment 4, Line 14, Col. (b)\n                                                  -   \nTP\n         1.0000 \n                                  -   \n3\nDistribution\n207.75.g for end of year, records for other months\n                                                  -   \nN/A\n                 -   \n                                  -   \n4\nGeneral & Intangible\nAttachment 4, Line 14, Col. (c)\n                                                  -   \nWS\n         1.0000 \n                                  -   \n5\nTOTAL GROSS PLANT\n(Sum of Lines 1 through 4)\n                                                  -   \nGP=\n         1.0000 \n                                  -   \n6\nACCUMULATED DEPRECIATION\nNote C\n7\nProduction\n219.20-24.c for end of year, records for other months\n                                                  -   \nN/A\n                 -   \n                                  -   \n8\nTransmission\nAttachment 4, Line 14, Col. (h)\n                                                  -   \nTP\n         1.0000 \n                                  -   \n9\nDistribution\n219.26.c for end of year, records for other months\n                                                  -   \nN/A\n                 -   \n                                  -   \n10\nGeneral & Intangible\nAttachment 4, Line 14, Col. (i)\n                                                  -   \nWS\n         1.0000 \n                                  -   \n11\nTOTAL ACCUM. DEPRECIATION\n(Sum of Lines 7 through 10)\n                                                  -   \n                                  -   \n12\nNET PLANT IN SERVICE\n13\nProduction\n(Line 1 - Line 7)\n                                              -   \n                               -   \n14\nTransmission\n(Line 2 - Line 8)\n                                              -   \n                               -   \n15\nDistribution\n(Line 3 - Line 9)\n                                              -   \n                               -   \n16\nGeneral & Intangible\n(Line 4 - Line 10)\n                                              -   \n                               -   \n17\nTOTAL NET PLANT\n( Sum of Lines 13 through 16)\n                                              -   \nNP=\n         1.0000 \n                               -   \n18\nADJUSTMENTS TO RATE BASE\n19\nAccount No. 281 (enter negative)\nAttachment 4, Line 28, Col. (d) (Note D)\n                                              -   \nN/A\n                 -   \n                               -   \n20\nAccount No. 282 (enter negative)\nAttachment 4, Line 28, Col. (e) (Note D)\n                                              -   \nNP\n         1.0000 \n                               -   \n21\nAccount No. 283 (enter negative)\nAttachment 4, Line 28, Col. (f) (Note D)\n                                              -   \nNP\n         1.0000 \n                               -   \n22\nAccount No. 190\nAttachment 4, Line 28, Col. (g) (Note D)\n                                              -   \nNP\n         1.0000 \n                               -   \n22a\nDeficient or (Excess) Accumulated Deferred Income Taxes\nAttachment 13, Line 7 (Note X)\n                                                  -   \nNP\n         1.0000 \n                               -   \n23\nAccount No. 255 (enter negative)\nAttachment 4, Line 28, Col. (h) (Note D)\n                                              -   \nNP\n         1.0000 \n                               -   \n24\nUnfunded Reserves (enter negative)\nAttachment 4, Line 43, Col. (h)\n                                              -   \nDA\n         1.0000 \n                               -   \n25\nCWIP\nAttachment 4, Line 14, Col. (d)\n                                              -   \nDA\n         1.0000 \n                               -   \n26\nUnamortized Regulatory Asset\nAttachment 4, Line 28, Col. (b) (Note E)\n                                              -   \nDA\n         1.0000 \n                               -   \n27\nUnamortized Abandoned Plant\nAttachment 4, Line 28, Col. (c) (Note F)\n                                              -   \nDA\n         1.0000 \n                               -   \n28\nTOTAL ADJUSTMENTS\n( Sum of Lines 19 through 27)\n                                              -   \n                                  -   \n29\nLAND HELD FOR FUTURE USE\nAttachment 4, Line 14, Col. (e) (Note G)\n                                              -   \nTP\n         1.0000 \n                               -   \n30\nWORKING CAPITAL\nNote H\n31\nCash Working Capital\n1/8*(Page 3, Line 17 minus Page 3, Line 14)\n                                              -   \n                               -   \n32\nMaterials & Supplies\nAttachment 4, Line 14, Col. (f)\n                                              -   \nTP\n         1.0000 \n                               -   \n33\nPrepayments (Account 165)\nAttachment 4, Line 14, Col. (g)\n                                              -   \nGP\n         1.0000 \n                               -   \n34\nTOTAL WORKING CAPITAL\n( Sum of Lines 31 through 33)\n                                              -   \n                                  -   \n35\nRATE BASE\n( Sum of Lines 17, 28, 29, and 34)\n                                              -   \n                                  -   \nFormula Rate - Non-Levelized"},{"page":498,"startToken":175028,"endToken":175557,"text":"Page 3 of 5\nRate Formula Template\nUtilizing FERC Form 1 Data\nDesertLink, LLC\nFor the 12 months ended\n12/31/__\nLine\n(1)\n(2)\n(3)\n(4)\n(5)\nNo.\nSource\nCompany Total\nAllocator (W)\nTransmission\nO&M\n(Col 3 times Col 4)\n1\nTransmission\n321.112.b\n                                                  -   \nTP\n         1.0000 \n                                  -   \n2\nLess Account 566 (Misc Trans Expense)\n321.97.b\n                                                  -   \nTP\n         1.0000 \n                                  -   \n3\nLess Account 565\n321.96.b\n                                                  -   \nTP\n         1.0000 \n                                  -   \n4\nA&G\n323.197.b\n                                                  -   \nWS\n         1.0000 \n                                  -   \n5\nLess FERC Annual Fees\n351.h (Note I)\n                                                  -   \nWS\n         1.0000 \n                                  -   \n6\nLess EPRI Dues\nNote J\n                                                  -   \nWS\n         1.0000 \n                                  -   \n7\nLess Reg. Commission Expense Account 928\nNote J\n                                                  -   \nWS\n         1.0000 \n                                  -   \n8\nLess: Non-safety Advertising account 930.1\nNote J\n                                                  -   \nWS\n         1.0000 \n                                  -   \n9\n10\nPlus Transmission Related Reg. Comm. Exp.\nNote K\n                                                  -   \nTP\n         1.0000 \n                                  -   \n11\n12\nPlus Transmission Lease Payments in Acct 565\nNote V\n                                                  -   \nDA\n         1.0000 \n                                  -   \n13\nAccount 566\n14\nAmortization of Regulatory Asset\nNote E\n                                                  -   \nDA\n         1.0000 \n                                  -   \n15\nMisc. Transmission Expense (less amort. of regulatory asset)\n321.97.b less line 14\n                                                  -   \nTP\n         1.0000 \n                                  -   \n16\nTotal Account 566\n(Sum of Lines 14 through 15) Ties to 321.97b\n                                                  -   \n                                  -   \n17\nTOTAL O&M\n                                                  -   \n                                  -   \n18\nDEPRECIATION EXPENSE\nNote C\n19\nTransmission\n336.7.b&d\n                                                  -   \nTP\n         1.0000 \n                                  -   \n20\nGeneral & Intangible\n336.10.b&d, 336.1.b&d\n                                                  -   \nWS\n         1.0000 \n                                  -   \n21\nAmortization of Abandoned Plant\nNote F\n                                                  -   \nDA\n         1.0000 \n                                  -   \n22\nTOTAL DEPRECIATION\n(Sum of Lines 19 through 21)\n                                                  -   \n                                  -   \n23\nTAXES OTHER THAN INCOME TAXES   (Note M)\n24\nLABOR RELATED\n25\nPayroll\n263.i\n                                                  -   \nWS\n         1.0000 \n                                  -   \n26\n263.i\n                                                  -   \nWS\n         1.0000 \n                                  -   \n27\nPLANT RELATED\n28\nProperty\n263.i\n                                                  -   \nGP\n         1.0000 \n                                  -   \n29\nGross Receipts\n263.i\n                                                  -   \nN/A\n         \n                                  -   \n30\nOther\n263.i\n                                                  -   \nGP\n         1.0000 \n                                  -   \n31\nPayments in lieu of taxes\n263.i\n                                                  -   \nGP\n         1.0000 \n                                  -   \n32\nTOTAL OTHER TAXES\n( Sum of Lines 25 through 31)\n                                                  -   \n                                  -   \n33\nINCOME TAXES    (Note N)\nNote N\n34\nT=1 - {[(1 - SIT) * (1 - FIT)] / (1 - SIT * FIT * p)}\n0.00%\n35\nCIT=(T/1-T) * (1-(WCLTD/R)) =\nWCLTD = Page 4, Line 15, R = Page 4, Line 18\n0.00%\n36\nFIT & SIT & P\n37\n38\n1 / (1 - T)  = (from line 35)\n1 / (1 - T), T from Line 35\n                                         1.0000 \n39\nAmortized Investment Tax Credit\n266.8f (enter negative) (Note D)\n                                                  -   \n40\nDeficient or (Excess) Deferred Income Taxes\nAttachment 13, Line 12, Col. (d) (Note X)\n                                                  -   \n41\nTax Effect of Permanent Differences\nNote O\n                                                  -   \n42\nIncome Tax Calculation\n(Line 35 times Line 48)\n                                                  -   \nN/A\n                                  -   \n43\nITC adjustment\n(Line 38 times Line 39)\n                                                  -   \nNP\n         1.0000 \n                                  -   \n44\nDeficient or (Excess) Deferred Income Tax Adjustment\nAttachment 13, Line 12, Col. (f) (Note X)\n                                                  -   \nNP\n         1.0000 \n                                  -   \n45\nPermanent Differences Tax Adjustment\n(Line 38 times Line 41)\n                                                  -   \nNP\n         1.0000 \n                                  -   \n46\nTotal Income Taxes\n(Sum of Lines 42 through 45)\n                                                  -   \n                                  -   \n47\nRETURN\n48\nRate Base times Return\n(Page 2, Line 35 times Page 4, Line 18)\n                                                  -   \nN/A\n                 -   \n                                  -   \n49\nGROSS REVENUE REQUIREMENT\n( Sum of Lines  17, 22, 32, 46, and 48)\n                                                  -   \n                                  -   \n(Sum of Lines 1, 4, 10, 12, and 16 less Sum of Lines 2, 3, and 5 \nthrough 8)\nHighway and vehicle"},{"page":499,"startToken":175557,"endToken":175827,"text":"Formula Rate - Non-Levelized\nPage 4 of 5\nRate Formula Template\nUtilizing FERC Form 1 Data\nDesertLink, LLC\nFor the 12 months ended\n12/31/__\nLine\n(1)\n(2)\n(3)\n(4)\n(5)\nNo.\nSUPPORTING CALCULATIONS AND NOTES\nTRANSMISSION PLANT INCLUDED IN ISO RATES\n1\nTotal Transmission plant\n(Page 2, Line 2, Col. 3)\n                                  -   \n2\n(Note P)\n                                  -   \n3\n(Note S)\n                                  -   \n4\nTransmission plant included in ISO rates\n(Line 1 minus Lines 2 and 3)\n                                  -   \n5\nPercentage of Transmission plant included in ISO Rates\n(Line 4 divided by Line 1)\nTP =                               1.00 \n6\nWAGES & SALARY ALLOCATOR (W&S)\nForm 1 Reference\n$\nTP\nAllocation\n7\nProduction\n354.20.b\n                                                  -   \n            -                    -   \n8\nTransmission\n354.21.b\n                                                  -   \n        1.00                  -   \n9\nDistribution\n354.23.b\n                                                  -   \n            -                    -   \nW&S Allocator\n10\nOther\n354.24,25,26.b\n                                                  -   \n            -                    -   \n($ / Allocation)\n11\nTotal (W&S Allocator is 1 if lines 7-10 are zero)\n(Sum of Lines 7 through 10)\n                                                  -   \n                 -   \n=\n                        1.00000  = WS\n12\nRETURN (R)\n13\n14\n$\n%\nCost\nWeighted\n15\nLong Term Debt\nAttachment 5, Line 8 (Notes Q & R)\n                                                  -   \n50.0%\n0.00%\n0.00% = WCLTD\n16\nPreferred Stock (112.3.c)\nAttachment 5, Line 9 (Notes Q & R)\n                                                  -   \n0.0%\n0.00%\n0.00%\n17\nCommon Stock\nAttachment 5, Line 10 (Notes Q, R, and T)\n                                                  -   \n50.0%\n9.80%\n4.90%\n18\nTotal\n( Sum of Lines 15 through 17)\n                                                  -   \n4.90% = R\n19\nREVENUE CREDITS\n$\n20\nAttachment 12, Line 8, Col. C (Note U)\n                                  -   \n21\nACCOUNT 456.1 (OTHER ELECTRIC REVENUES)\nAttachment 12, Line 18, Col. C (Note A)\n                                  -   \nLess Transmission plant excluded from ISO rates\nLess Transmission plant included in OATT Ancillary Service \nrates\nACCOUNT 454 (RENT FROM ELECTRIC"},{"page":500,"startToken":175827,"endToken":177402,"text":"Formula Rate - Non-Levelized\nPage 5 of 5\nRate Formula Template\nUtilizing FERC Form 1 Data\nDesertLink, LLC\nFor the 12 months ended\n12/31/__\nGeneral Note: References to pages in this formula rate template are indicated as: (Page #, Line #, Col. #)\nReferences to data from FERC Form 1 are indicated as: #.y.x (page, line, column)\nNotes\nA\nB\nCompany will not have any grandfathered agreements. Therefore, this line shall remain zero.\nC\nPlant In Service, Accumulated Depreciation, and Depreciation Expenses shall exclude Asset Retirement Obligation amounts.\nD\nE\nF\nUnamortized Abandoned Plant and Amortization of Abandoned Plant will be zero until the Commission accepts or approves recovery of the cost of Abandoned Plant. Utility must submit a Section 205 filing to recover the cost of abandoned plant.\nG\nIdentified in FERC Form 1, or Company records if not so indicated on the FERC Form 1, as being transmission related.\nH\nI\nJ\nPage 3, Line 6 - Subtract all EPRI Annual Membership Dues listed in Form 1 at 353.f, all Regulatory Commission Expenses in account 928 itemized at 351.h, and non-safety related advertising included in Account 930.1.\nK\nPage 3, Line 8-Add back Regulatory Commission Expenses directly related to transmission service, ISO filings, or transmission siting itemized at 351.h.\nM\nN\nInputs Required:\nFIT = \n0.0%\n(Weighted Average Federal Income Tax Rate (Attachment 7, line 4, col. (i))\nSIT = \n0.0%\n(Weighted Average State Income Tax Rate (Attachment 7, line 8, col. (i))\np = \n0.0%\n(Percent of federal income tax deductible for state purposes)\nO\nP\nRemoves transmission plant determined by Commission order to be state-jurisdictional according to the seven-factor test (until Form 1 balances are adjusted to reflect application of seven-factor test).\nQ\nR\nS\nT\nThe rate of return on common equity (\"ROE\") will be supported in the original Section 205 filing and shall, at no time during the life of the Project, be higher than 9.8%, including adders.  No change in ROE may be made absent a filing with FERC.\nU\nIncludes only income related to transmission facilities, such as pole attachments, rentals and special use from general ledger.\nV\nAdd back any lease expense of transmission assets used to provide service under this tariff included in account 565. Amount to be obtained from company books and records.\nW\nDA = Direct Assignment; GP = Gross Plant Allocator (page 2, line 5); N/A = Not Applicable; NP = Net Plant Allocator (page 2, line 17); TP = Transmission Plant Allocator (page 4, line 5); WS = Wage and Salary Allocator (page 4, line 11).\nX\nThe revenues credited on page 1, lines 2-6, shall include only the amounts received by DesertLink for service rendered using facilities for which recovery is provided under this tariff. They do not include revenues associated with FERC annual charges, gross \nreceipts taxes, or facilities not included in this template (e.g., direct assignment facilities and GSUs) which are not recovered under this Rate Formula Template.\nAccumulated deferred income tax amounts associated with asset or liability accounts excluded from rate base (such as ADIT related to asset retirement obligations and certain tax-related regulatory assets or liabilities) do not affect rate base.  Balance of Account \n255 will be reduced by prior flow throughs and excluded if the utility chooses to utilize amortization of tax credits against taxable income. Account 281 is not allocated to Transmission.\nRecovery of Regulatory Asset permitted only for pre-commercial and formation expenses as authorized by the Commission. Recovery of any other regulatory assets requires authorization from the Commission. A carrying charge equal to the AFUDC rate will \nbe applied to the Regulatory Asset prior to the rate year when costs are first recovered.\nCash Working Capital assigned to transmission is one-eighth of O&M allocated to transmission at page 3, line 17, column 5 minus amortization of Regulatory Asset at page 3, line 14, column 5.  Prepayments are the electric related prepayments booked to \nAccount No. 165 and reported on page 111, line 57 in the Form 1.\nThe FERC's annual charges for the year assessed the Transmission Owner for service under this tariff.  To the extent the charges are separately identified on the FERC Form 1, page 350, column 1, the line number will be added to the source in Column 2 for \nreference.  Line item references can change from year to year.  Items not specifically identified in the FERC Form 1, page 350 will be obtained from Company books and records.\nIncludes only FICA, unemployment, highway, property, gross receipts, and other assessments charged in the current year.  Taxes related to income are excluded.  Enter the line number on page 262-63 upon which each item is identified.  To the extent individual \ntypes of taxes are separately identified on the FERC Form 1, page 262, column a, the line number will be added to the source in Column 2 for reference.  Line item references can change from year to year.  Items not specifically identified in the FERC Form 1, \npage 262-63 will be obtained from Company books and records.\nFIT is the weighted average Federal income tax rate and SIT is the weighted average State income tax rate, both from Attachment 7, and p is the \"the percentage of federal income tax deductible for state income taxes\". A utility that elected to utilize amortization \nof tax credits against taxable income, rather than book tax credits to Account No. 255 and reduce rate base, must reduce its income tax expense by the amount of the Amortized Investment Tax Credit (Form 1, 266.8.f) multiplied by (1/1-T) (page 3, line 26).  \nExcess Deferred Income Taxes reduce income tax expense by the amount of the expense multiplied by (1/(1-T)).\nThe Tax Effect of Permanent Differences captures the differences in the income taxes due under the Federal and State calculations and the income taxes calculated in Appendix III that are not the result of a timing difference. Tax Effect equals Permanent \nDifferences multiplied by T.\nThe cost of debt will be determined based on the financing in place during each stage of project development. Before debt is obtained, a proxy interest rate which will be supported in the original Section 205 filing will be used. This rate is provided on \nAttachment 8 line 36. If construction debt (wherein principal is drawn down over time) is issued, the rate plus an amortization of fees projected to be incurred on the construction debt during the rate year will be the cost of debt. This construction debt rate \n(inclusive of fees) will be reset and trued-up every year using the method on Attachment 9 for multi-year construction projects. Once non-construction debt is obtained, the actual interest rate and fees on the debt in place at the end of the year such non-\nconstruction debt is obtained will become the cost of debt. In the first full year after non-construction debt is obtained, the cost of debt will be the actual cost of debt determined using the method on Attachment 5. \nA h\nh i\nl\ni l\nf 50% E\ni\nd 50% d b\nill b\nd\nil h fi\ni i\ni\nl\nd i\ni\nil\nh\ni\nh\ni\nd b\nh C\ni i\nAf\nh f\nili i\nl\nd i\ni\nh l\nf\n50%\ni\nh\nh i\nl\nCalculate rate base using 13 month average balance, except ADIT.  The calculation of ADIT in the annual true-up calculation will use the beginning-of-year and end-of-year balances, and will be performed in accordance with IRS regulation Section 1.167(l)-\n1(h)(6).  The calculation of ADIT in the annual projection will be performed in accordance with IRS Regulation Section 1.167(l)-1(h)(6). \nRemoves dollar amount of transmission plant to be included in the development of OATT ancillary services rates and generation step-up facilities, which are deemed to be included in OATT ancillary services. For these purposes, generation step-up facilities are \nthose facilities at a generator substation on which there is no through-flow when the generator is shut down.\nUpon enactment of changes in tax law, ADIT balances are re-measured and adjusted in the Company’s books of account, resulting in excess or deficient accumulated deferred income tax assets and liabilities.  Excess or deficient ADIT attributable to timing \ndifferences between the amounts of expenses or revenues recognized for income tax purposes and amounts of expenses or revenues recognized for ratemaking purposes as well as subsequent recoverable or refundable amortization of such amounts will be based \nupon Company records and be calculated and recorded in accordance with ASC 740 and any applicable normalization requirements of the taxing jurisdiction.  The Deficient or (Excess) Deferred Income Tax Adjustment (page 3, line 44) is computed by \nmultiplying each component of Deficient or (Excess) Deferred Income Taxes (page 3, line 40) by the applicable tax gross-up factor.  For each re-measurement of ADIT, the amounts entered as the Deficient or (Excess) Accumulated Deferred Income Taxes \ncomponent of ADJUSTMENTS TO RATE BASE (page 2, line 22a) or as the Deficient or (Excess) Deferred Income Tax Adjustment component of INCOME TAXES (page 3, line 44) will be supported by Attachment 13 (Deficient or Excess Accumulated \nDeferred Income Taxes) providing the balance for each taxing jurisdiction at the beginning and end of the year, amortization for the year, calculation of the gross-up to the revenue requirement level and any other information required to support compliance with \nany applicable normalization requirements."},{"page":501,"startToken":177402,"endToken":177734,"text":"Page 1 of 3\nFor the twelve months ended 12/31/__\nAttachment 1\nProject Revenue Requirement Worksheet\nDesertLink, LLC\nTo be completed in conjunction with Appendix III.\nLine\n(1)\n(2)\n(3)\n(4)\nNo.\nAppendix III, Page, Line, Col.\nTransmission\nAllocator\n1\nGross Transmission Plant plus CWIP\nAppendix III, p 2, line 2, col 5 plus line 25, col 5 (Note A)\n                                                         -   \n2\nNet Transmission Plant plus CWIP and Abandoned Plant\nAppendix III, p 2, line 14, col 5 plus line 25 & 27, col 5 (Note B)\n                                                         -   \nO&M EXPENSE\n3\nTotal O&M Allocated to Transmission\nAppendix III, p 3, line 17, col 5\n                                                         -   \n4\nAnnual Allocation Factor for O&M\n(line 3 divided by line 1, col 3)\n0.00%\n0.00%\nGENERAL AND INTANGIBLE (G&I) DEPRECIATION EXPENSE\n5\nTotal G&I Depreciation Expense\nAppendix III, p 3, line 20, col 5 (Note C)\n                                                         -   \n6\nAnnual Allocation Factor for G&I Depreciation Expense\n(line 5 divided by line 1, col 3)\n0.00%\n0.00%\nTAXES OTHER THAN INCOME TAXES\n7\nTotal Other Taxes\nAppendix III, p 3, line 32, col 5\n                                                         -   \n8\nAnnual Allocation Factor for Other Taxes\n(line 7 divided by line 1, col 3)\n0.00%\n0.00%\n9\nLess Revenue Credits\nAppendix III, p 1, line 6 col 5\n                                                         -   \n10\nAnnual Allocation Factor for Revenue Credits\n(line 9 divided by line 1, col 3)\n0.00%\n0.00%\n11\nAnnual Allocation Factor for Expense\nSum of lines 4, 6, 8, and 10\n0.00%\nINCOME TAXES \n12\nTotal Income Taxes\nAppendix III, p 3, line 46, col 5\n                                                         -   \n13\nAnnual Allocation Factor for Income Taxes\n(line 12 divided by line 2, col 3)\n0.00%\n0.00%\nRETURN\n14\nReturn on Rate Base\nAppendix III, p 3, line 48, col 5\n                                                         -   \n15\nAnnual Allocation Factor for Return on Rate Base\n(line 14 divided by line 2, col 3)\n0.00%\n0.00%\n16\nAnnual Allocation Factor for Return\nSum of lines 13 and 15\n0.00%"},{"page":502,"startToken":177734,"endToken":177935,"text":"Page 2 of 3\nFor the twelve months ended 12/31/__\nAttachment 1\nProject Revenue Requirement Worksheet\nDesertLink, LLC\nAny hypothetical amounts or project names in a filed template will be removed and replaced with actual amounts in the first year actual values are available without the need for a section 205 filing to modify the template.\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\nProject Name\nCAISO Category\nIdentifier\nProject Gross Plant\nProject Net Plant\nAnnual Return Charge\n(Note D)\n(Page 1, line 11)\n(Col. 3 * Col. 4)\n(Note E)\n(Page 1, line 16)\n(Col. 6 * Col. 7)\n1a\nProject A\nAAAA\n                                                  -   \n0.00%\n                       -    $                                                      -   \n0.00%\n                                         -   \n1b\nProject B\nBBBB\n                                                  -   \n0.00%\n                       -    $                                                      -   \n0.00%\n                                         -   \n2\nTotal Schedule 12\n                                                  -   \n                       -    $                                                      -   \n                                         -   \n3a\nProject C\nCCCC\n                                                  -   \n0.00%\n                       -    $                                                      -   \n0.00%\n                                         -   \n3b\nProject D\nDDDD\n                                                  -   \n0.00%\n                       -    $                                                      -   \n0.00%\n                                         -   \n4\nTotal Zonal\n                                                  -   \n                       -    $                                                      -   \n                                         -   \n5\nOther\n                                                  -   \n0.00%\n                       -    $                                                      -   \n0.00%\n                                         -   \n6\nAnnual Totals\n                                                  -   \n                       -    $                                                      -   \n                                         -   \nThis worksheet is used to compute project specific revenue requirements for any projects for which such calculation is required by CAISO. Other projects which comprise the remaining revenue requirement on Appendix III will \nnot be entered on this schedule.\nLine \nNo.\nAnnual Allocation \nFactor for Expense\nAnnual \nExpense \nCharge\nAnnual \nAllocation \nFactor for \nReturn"},{"page":503,"startToken":177935,"endToken":178381,"text":"Page 3 of 3\nFor the twelve months ended 12/31/__\nAttachment 1\nProject Revenue Requirement Worksheet\nDesertLink, LLC\n(9)\n(10)\n(11)\n(12)\n(12a)\n(13)\n(14)\n(15)\n(16)\nIncentive Return\nCeiling Rate\n(Note F)\n(Sum Col. 5, 8 & 9)\n(Note G)\n(Sum Col. 10 & 12)\n(Note H)\n(Sum Col. 10 & 12 Less Col. 13)\n(Note I)\n(Sum Col. 14 & 15)\n1a\n                                         -                              -   \n                              -                                               -   \n                             -                          -                                                            -                          -                                            -   \n1b\n                                         -                              -   \n                              -                                               -   \n                             -                          -                                                            -                          -                                            -   \n2\n                                         -                                 -   \n                                                  -                                -                          -                                                            -                          -                                            -   \n3a\n                                         -                              -   \n                              -                                               -   \n                             -                          -                                                            -                          -                                            -   \n3b\n                                         -                              -   \n                              -                                               -   \n                             -                          -                                                            -                          -                                            -   \n4\n                                         -                                 -   \n                                                  -                                -                          -                                                            -                          -                                            -   \n5\n                                         -                              -   \n                              -                                               -   \n                             -                          -                                                            -                          -                                            -   \n6\n                                         -                                 -   \n                                                  -                                -                          -                                                            -                          -                                            -   \nNotes\nA\nGross Transmission Plant is that identified on page 2 line 2 of Appendix III inclusive of any CWIP or unamortized abandoned plant included in rate base when authorized by FERC order.\nB\nNet Plant is that identified on page 2 line 14 of Appendix III inclusive of any CWIP or unamortized Abandoned Plant included in rate base when authorized by FERC order less any prefunded AFUDC, if applicable.\nC\nD\nE\nF\nG\nRequires approval by FERC of incentive return applicable to the specified project(s).\nH\nI\nTrue-Up Adjustment is calculated on the Project True-up Schedule for the relevant true-up year.\nLine \nNo.\nProject \nDepreciation/Amortizatio\nn Expense\nAnnual Revenue \nRequirement\nIncentive Return in \nBasis Points\nCompetitive \nConcession\nTotal Annual Revenue \nRequirement\nTrue-Up \nAdjustment\nNet Revenue \nRequirement\n(Attachment 2, Line 28 Incentive \nReturn * Col. 6 * Col. 11/100)\nGeneral and Intangible Depreciation and Amortization Expense includes all expenses (except depreciation and armortization of G&I Asset Retirement Obligations) not directly associated with a project, which is entered on page 3 , \ncolumn 9.\nProject Gross Plant is the total capital investment including CWIP for the project calculated from Company books and records in the same method as the gross plant value in line 1.  This value includes subsequent capital \ninvestments required to maintain the facilities to their original capabilities.  Refer to Attachment 1a for detail.\nProject Net Plant is the Project Gross Plant Identified in Column 3 less the associated Accumulated Depreciation plus CWIP in rate base if applicable and Unamortized Abandoned Plant.  Refer to Attachment 1a for detail.\nProject Depreciation Expense is the actual value booked for the project (excluding General and Intangible depreciation) at Appendix III, page 3, line 19, plus amortization of Abandoned Plant at Appendix III, page 3, line 21.  For \neach project on Attachment 1a, Depreciation Expense is Attachment 1a, Line 2, Column (15) minus Column (3), and Amortization of Abandoned Plant is the difference between Columns (3) and (15) on Attachment 1a, Line 4.\nThe Competitive Concession is the reduction in revenue, if any, that the company agreed to, for instance, to be selected to build facilities as the result of a competitive process and equals the amount by which the  annual revenue \nrequirement is reduced from the ceiling rate."},{"page":504,"startToken":178381,"endToken":178709,"text":"Att 1a - Project Plant Detail\n Page 10\nPage 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 1a\nProject Plant Detail Worksheet\nDesertLink, LLC\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\n(15)\nProject Name\n13-month average\n1a\nProject A\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n1b\nProject B\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n…\n…\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n1\nTotal Project Transmission Gross Plant\n                                                                -                                -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\n(15)\nProject Name\n13-month average\n2a\nProject A\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n2b\nProject B\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n…\n…\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n2\nTotal Project Transmission Accumulated Depreciation\n                                                                -                                -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\n(15)\nProject Name\n13-month average\n3a\nProject A\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n3b\nProject B\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n…\n…\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n3\nTotal Project CWIP\n                                                                -                                -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\n(15)\nProject Name\n13-month average\n4a\nProject A\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n4b\nProject B\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n…\n…\n                                                                -                                 -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n4\nTotal Project Unamortized Abandoned Plant\n                                                                -                                -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -                           -   \n(1)\n(2)\nProject Name\n5a\nProject A\n                                                                -   \n5b\nProject B\n                                                                -   \n…\n…\n … \n5\nTotal Project Transmission Net Plant\n                                                                -   Ties to Appendix III, p 2, line 14, col 5 plus line 25 & 27, col 5; Used on Attachment 1, Column (6) \nLine \nNo.\nProject\nTransmission \nGross Plant\n20__\nDecember\n20__\nJanuary\n20__\nFebruary\n20__\nMarch\n20__\nApril\n20__ \nMay\n20__ \nJune\n20__ \nJuly\n20__\nAugust\n20__\nSeptember\n20__\nOctober\n20__ \nNovember\n20__\nDecember\nLine \nNo.\nProject\nTransmission Accumulated \nDepreciation \n20__\nDecember\n20__\nJanuary\n20__\nFebruary\n20__\nMarch\n20__\nApril\n20__ \nMay\n20__ \nJune\n20__ \nJuly\n20__\nAugust\n20__\nSeptember\n20__\nOctober\n20__ \nNovember\n20__\nDecember\nLine \nNo.\nProject CWIP\n20__\nDecember\n20__\nJanuary\n20__\nFebruary\n20__\nMarch\n20__\nApril\n20__ \nMay\n20__ \nJune\n20__ \nJuly\n20__\nAugust\n20__\nSeptember\n20__\nOctober\n20__ \nNovember\n20__\nDecember\nLine \nNo.\nProject \nUnamortized Abandoned Plant\n20__\nDecember\n20__\nJanuary\n20__\nFebruary\n20__\nMarch\n20__\nApril\n20__ \nMay\n20__ \nJune\n20__ \nJuly\n20__\nAugust\n20__\nSeptember\n20__\nOctober\n20__ \nNovember\n20__\nDecember\nLine \nNo.\nProject\nTransmission \nNet Plant\n13-month average\n(Line 1 - Line 2 + Line 3 + Line 4)"},{"page":505,"startToken":178709,"endToken":179186,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 2\nIncentive Return\nDesertLink, LLC\nLine\n1\nRate Base\nAppendix III, Page 2, Line 35, Col.5\n                                                                         -   \n2\n100 Basis Point Incentive Return\n$\nCost\n$\n%\nWeighted\n3\nLong Term Debt\n(Notes Q & R from Appendix III) \n                            -   \n50.00%\n0.00%\n0.00%\n4\nPreferred Stock\n(Notes Q & R from Appendix III) \n                            -   \n0.00%\n0.00%\n0.00%\n5\nCommon Stock\n(Notes Q, R, & T from Appendix III)\n                            -   \n50.00%\n10.80%\n5.40%\n6\nTotal (sum lines 3-5)\n                            -   \n5.40%\n7\n100 Basis Point Incentive Return multiplied by Rate Base (line 1 * line 6)\n                                                                         -   \n8\nINCOME TAXES\n9\nT=1 - {[(1 - SIT) * (1 - FIT)] / (1 - SIT * FIT * p)} =\n0.00%\n10\nCIT=(T/1-T) * (1-(WCLTD/R)) =\n0.00%\n11\nWCLTD\nLine 3\n0.00%\n12\nFIT, SIT & p are as given in Appendix III footnote N.\n13\n1 / (1 - T)\nLine 9\n                    1.0000 \n14\nAmortized Investment Tax Credit (266.8f) (enter negative)\nAppendix III, Page 3, Line 39\n                            -   \n15\nDeficient or (Excess) Deferred Income Taxes\nAppendix III, Page 3, Line 40\n                            -   \n16\nTax Effect of Permanent Differences (Note B)\nAppendix III, Page 3, Line 41\n                            -   \n17\nIncome Tax Calculation\nLine 7 times Line 10\n                        -   \n18\nITC adjustment\nLine 13 times Line 14\n                            -   \nNP             1.00                         -   \n19\nDeficient or (Excess) Deferred Income Tax Adjustment\nAppendix III, Page 3, Line 44\n                            -   \nNP             1.00                         -   \n20\nPermanent Differences Tax Adjustment\nLine 13 times Line 16\n                            -   \nNP             1.00                         -   \n21\nTotal Income Taxes\nSum of Lines 17 through 20\n                            -   \n                        -                                                                            -   \n22\nReturn and Income Taxes with 100 basis point increase in ROE\n                                                                         -   \n23\nReturn\n(Appendix III, page 3, line 48, col 5)\n                                                                         -   \n24\nIncome Tax\n(Appendix III, page 3, line 46, col 5)\n                                                                         -   \n25\nReturn and Income Taxes without 100 basis point increase in ROE\nSum of Lines 23 and 24\n                                                                         -   \n26\nIncremental Return and Income Taxes for 100 basis point increase in ROE\nLine 22 less Line 25\n                                                                         -   \n27\nRate Base\nLine 1\n                                                                         -   \n28\nIncremental Return and Income Taxes for 100 basis point increase in ROE divided by Rate Base Line 26 divided by Line 27\n0.00%\nNotes\nA\nB\nThe Tax Effect of Permanent Differences captures the differences in the income taxes due under the Federal and State calculations and the income taxes calculated in Appendix III that are not the result of a timing difference.\nCost = Appendix III, Page 4, Line 17, \nplus 100 bp\nThe 100 basis point increase in ROE is used only to determine the increase in return and income taxes associated with a 100 basis point increase in ROE and does not reflect what incentives the Commission \nmay approve for a specific transmission project. The overall ROE inclusive of incentives is subject to the limitations noted in Appendix III, Note T.  Any ROE actual incentive must be approved by the \nCommission."},{"page":506,"startToken":179186,"endToken":179732,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 3\nFormula Rate True-Up\nDesertLink, LLC\nAny hypothetical amounts or project names in a filed template will be removed and replaced with actual amounts in the first year actual values are available without the need for a section 205 filing to modify the template.\nAnnual True-Up Calculation\nLine\n1\nTrue-Up Year\n2\nC\nD\n                             -   \nF\nG\nH\nI\nJ\nA\nB\nE\nProject Name\n3\nRemaining Appendix III\n0.0%\n                             -   \n                               -    $                          -   \n                             -   \n4a\nProject A\nAAAA\n                             -   \n0.0%\n                             -                                  -                                  -    $                          -                                -                                -   \n4b\nProject B\nBBBB\n                             -   \n0.0%\n                             -                                  -                                  -    $                          -                                -                                -   \n5\nTotal Schedule 12\n                             -   \n                             -                                  -                                  -    $                          -                                -                                -   \n6a\nProject C\nCCCC\n                             -   \n0.0%\n                             -                                  -                                  -    $                          -                                -                                -   \n6b\nProject D\nDDDD\n                             -   \n0.0%\n                             -                                  -                                  -    $                          -                                -                                -   \n7\nTotal Zonal\n                             -   \n                             -                                  -                                  -    $                          -                                -                                -   \n8\nOther\n                             -   \n0.0%\n                             -                                  -                                  -    $                          -                                -                                -   \n9\n                             -   \n0.0%\n                             -                                  -                                  -                                -                                -                                -   \n10\n $                          -   Total Interest on True-Up - Attachment 6\nPrior Period Adjustment\nA\nB\nSource\n11\nDescription of Adjustment\n                 -   \nNotes\n1)\nThe revenue received is the total amount of revenue distributed to company in the  year as shown on pages 328-330 of the Form No 1. The Revenue Received is input on line 2, Col. E.\n2)\nFrom the Attachment 1, lines 1a through 6, col. 16 from the template in which the true-up year revenue requirement was initially projected.\n3)\nFrom True-Up revenue requirement template Attachment 1, lines 1a through 6, col. 14.\n4)\n5)\nCorrections to true-ups for previous rate years including interest will be computed on Attachment 11 and entered on the appropriate line 3-8 above.\nThis Attachment 3 is used to calculate the annual formula rate true-up. Any projects for which the RTO requires a true-up on an individual project basis, as shown on Attachment 1, will be computed separately. The remainder of the \nrevenue requirement will also be trued up. The utility will individually enter the projected true-up year revenue requirements in Column C. A percentage of total will be calculated in Column D. Actual revenue received during the \ntrue-up year is entered into Column E, line 2 and allocated using the Column D percentage. The utility will prepare this formula rate template with the actual inputs for the true-up year, with the resulting revenue requirement for each \nline being separately entered in Column F.  In Col. G, Col. F is subtracted from Col. E to calculate the true-up adjustment. Interest on the true-up is computed in Column H. Any adjustments to prior period true-ups are entered in Col. \nI.  Col. J computes the total true-up as the sum of Col. G, H and I.\nProjected True-Up Year Revenue \nRequirement Calculation\nTrue-Up Year \nRevenue Received1\nActual True-Up \nYear Revenue Req.\nCAISO \nIdentification\nProject # Or \nOther \nIdentifier\nNet Revenue \nRequirement2\n% of Total \nRevenue  \nRequirement\nAllocation of \nRevenue Received     \n                                   \n                    (E, Line \n2) x (D)\nTrue-Up Net Revenue \nRequirement3\nNet Under/(Over) \nCollection   (F)-(E)\nTrue-Up Interest \nIncome (Expense)4 \n(D) x (H, line 10)\nPrior Period \nAdjustment with \nInterest5\nTotal True-Up        \n(G) + (H) + (I)\nTotal Annual Revenue \nRequirements\nPrior Period Adjustment \n(Note 5)\nAdjustment \nAmount\nAttachment \n11\nInterest due on the true up is calculated for the 24 month period from the start of the true-up year until the end of the year following the true-up year when the true up will be included in rates. Total True up Interest calculate on \nAttachment 6 and allocated to projects based on the percentage in Column D."},{"page":507,"startToken":179732,"endToken":180061,"text":"Page 1 of 2\nFor the twelve months ended 12/31/__\nAttachment 4\nRate Base Worksheet\nDesertLink, LLC\nGross Plant in Service\nCWIP\nLHFFU\nWorking Capital\nAccumulated Depreciation\nMonth\nTransmission\nCWIP in Rate Base\nHeld for Future Use\nMaterials & Supplies\nPrepayments\nTransmission\n(a)\n(b)\n(c) \n(d)\n(e) \n(f)\n(g)\n(h)\n(i)\n(Note A)\n1\nDecember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n2\nJanuary\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n3\nFebruary\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n4\nMarch\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n5\nApril\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n6\nMay\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n7\nJune\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n8\nJuly\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n9\nAugust\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n10\nSeptember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n11\nOctober\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n12\nNovember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n13\nDecember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \n14\n                             -                                -                                  -                                       -                                      -                                      -                                    -                                    -   \nAdjustments to Rate Base\nMonth\n(a)\n(b)\n(c) \n(d)\n(e) \n(f)\n(g)\n(h)\n(Note A)\nNote C\nNote D\n272.8.b & 273.8.k\n274.2.b & 275.2.k\n276.9.b & 277.9.k\n234.8.b & c\n15\nDecember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -   \n16\nJanuary\n                   -                                -                                -   \n                                 -   \n17\nFebruary\n                   -                                -                                -   \n                                 -   \n18\nMarch\n                   -                                -                                -   \n                                 -   \n19\nApril\n                   -                                -                                -   \n                                 -   \n20\nMay\n                   -                                -                                -   \n                                 -   \n21\nJune\n                   -                                -                                -   \n                                 -   \n22\nJuly\n                   -                                -                                -   \n                                 -   \n23\nAugust\n                   -                                -                                -   \n                                 -   \n24\nSeptember\n                   -                                -                                -   \n                                 -   \n25\nOctober\n                   -                                -                                -   \n                                 -   \n26\nNovember\n                   -                                -                                -   \n                                 -   \n27\nDecember\n                   -                                -                                -                                  -                                       -                                      -                                      -                                    -   \n28\n                             -                                -                                  -                                       -                                      -                                      -                                    -   \nLine \nNo\nGeneral & \nIntangible\nGeneral & Intangible\n207.58.g less \n207.57.g for end of \nyear, records for \nother months\n205.5.g & 207.99.g \nless 207.98.g for \nend of year, records \nfor other months\nNote B - page 2, \ncolumn C\n214.47.d for end of \nyear, records for other \nmonths\n227.8.c & 227.16.c for \nend of year, records for \nother months\n111.57.c for end of \nyear, records for other \nmonths\n219.25.c less ARO for \nend of year, records \nfor other months\n219.28.c & 200.21.c \nless ARO for end of \nyear, records for other \nmonths\nAverage of the 13 \nMonthly Balances\nUnamortized \nRegulatory Asset\nUnamortized \nAbandoned Plant\nAccount No. 281 \nAccumulated \nDeferred Income \nTaxes (Note E)\nAccount No. 282 \nAccumulated Deferred \nIncome Taxes (Note E)\nAccount No. 283 \nAccumulated Deferred \nIncome Taxes (Note E)\nAccount No. 190 \nAccumulated \nDeferred Income \nTaxes (Note E)\nAccount No. 255 \nAccumulated \nDeferred Investment \nCredit (Note I)\nConsistent with \n266.8.b & 267.8.h\nAverage of the 13 \nMonthly Balances"},{"page":508,"startToken":180061,"endToken":180767,"text":"Page 2 of 2\nFor the twelve months ended 12/31/\nAttachment 4\nRate Base Worksheet\nDesertLink, LLC\nTotal CWIP\n(a)\n(b)\n(c) = (a) - (b)\nCompany records\n29\nDecember\n                   -                                -                                -                                  -   \n30\nJanuary\n                   -                                -                                -                                  -   \n31\nFebruary\n                   -                                -                                -                                  -   \n32\nMarch\n                   -                                -                                -                                  -   \n33\nApril\n                   -                                -                                -                                  -   \n34\nMay\n                   -                                -                                -                                  -   \n35\nJune\n                   -                                -                                -                                  -   \n36\nJuly\n                   -                                -                                -                                  -   \n37\nAugust\n                   -                                -                                -                                  -   \n38\nSeptember\n                   -                                -                                -                                  -   \n39\nOctober\n                   -                                -                                -                                  -   \n40\nNovember\n                   -                                -                                -                                  -   \n41\nDecember\n                   -                                -                                -                                  -   \n                             -                                -                                  -   \nUnfunded Reserves   (Notes A and F and G)\n(a)\n(b)\n(b.i)\n(b.ii)\n(c) \n(d)\n(e) \n(f)\n(g)\n(h)\nList of all reserves\nAmount\n42a\nReserve 1\n -\n -\n                               -   \n -\n -\n -\n                                 -                                    -   \n42b\nReserve 2\n -\n -\n                               -   \n -\n -\n -\n                                 -                                    -   \n43\nTotal\n                               -   \n                                 -   \nNotes:\nA\nCalculate using 13 month average balance, except ADIT which is calculated based on the average of the beginning of the year and the end of the year balances\nB\nC\nD\nRecovery of abandoned plant is limited to any abandoned plant recovery authorized by FERC.\nE\nADIT is computed using the average of the beginning of the year and the end of the year balances. Electric ADIT only, Excludes ARO-related ADIT.\nF\nG\nH\nI\nBalance of Account 255 will be reduced by prior flow throughs and excluded if the utility chooses to utilize amortization of tax credits against taxable income.\nReconciliation of CWIP in Rate Base to FERC Form 1 - Note B\nLess: CWIP and \nAFUDC Excluded \nfrom Rate Base\nCWIP allowed in \nRate Base\n216.b for end of \nyear, records for \nother months\nAverage of the 13 \nMonthly Balances\nFERC balance sheet \naccount where \nreserves are \nrecorded \nFERC income \nstatement account \nwhere expenses are \nrecorded\nEnter 1 if NOT in a \ntrust or reserved \naccount, enter zero (0) \nif included in a trust or \nreserved account\nEnter 1 if the accrual \naccount is included in \nthe formula rate, enter \n(0) if the accrual \naccount is NOT \nincluded in the formula \nrate\nEnter the percentage \npaid for by customers \nless the percent \nassociated with an \noffsetting liability on \nthe balance sheet (Note \nH)\nAllocation (Plant or \nLabor Allocator)\nAmount Allocated, \ncol. c x col. d x col. e \nx col. f x col. g\nRecovery of CWIP in rate base must be approved by FERC.  Lines 29-41 of page 2 provide a reconciliation of the Company's total CWIP to the CWIP allowed in rate base. The annual report filed pursuant to the Protocols \nwill include for each project under construction (i) the CWIP balance eligible for inclusion in rate base; (ii) the CWIP balance ineligible for inclusion in rate base; and (iii) a demonstration that AFUDC is only applied to \nthe CWIP balance that is not included in rate base The annual report will also describe the reconciliation prepared on this Attachment\nRecovery of a Regulatory Asset is permitted only for pre-commercial and formation expenses, and is subject to FERC approval before the amortization of the Regulatory Asset can be included in rates. Recovery of any \nother regulatory assets requires authorization from the Commission.\nThe Formula Rate shall include a credit to rate base for all unfunded reserves (funds collected from customers that (1) have not been set aside in a trust, escrow or restricted account; (2) whose balance are collected from \ncustomers through cost accruals to accounts that are recovered under the Formula Rate; and (3) exclude the portion of any balance offset by a balance sheet ac count (see Note H)).  Each unfunded reserve will be included \non lines 42 above. The allocator in Col. (g) will be the same allocator used in the formula for the cost accruals to the account that is recovered under the Formula Rate.  Since reserves can be created by creating an \noffsetting balance sheet account, rather than through cost accruals, the amount to be deducted from rate base should exclude the portion offset by another balance sheet account.\nNot all unfunded reserves are created only from contributions from customers. Many are created by creating an offsetting liability in whole or in part.  Column (f) ensures only the portion of the unfunded reserve \ncontributed by the customer (and not created by an offsetting liability) is a reduction to rate base.\nThe inputs in Column (f) are the percentage of the unfunded reserve that was created by an offsetting liability. The percentage shown in Column (f) is then equal to the percentage that customers have contributed to the \nunfunded reserve."},{"page":509,"startToken":180767,"endToken":181144,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 5\nReturn on Rate Base Worksheet\nDesertLink, LLC\nRETURN ON RATE BASE ( R )\n$\n1\nLong Term Interest (117, sum of 62.c through 67.c) (Note D)\n                                -   \n2\nPreferred Dividends (118.29c) (positive number)\n                                -   \n3\nProprietary Capital (Line 25 (c))\n                                -   \n4\nLess Preferred Stock (Line 9) \n                                -   \n5\nLess Account 216.1 Undistributed Subsidiary Earnings (Line 25 (d))     \n                                -   \n6\nLess Account 219 Accum. Other Comprehensive Income (Line 25 (e))        \n                                -   \n7\nCommon Stock\n(Sum of Lines 3 through 6)   \n                                -   \n$\n%\nCost\nWeighted\n8\nLong Term Debt\nLine 25 (a), Note A and Appendix III Note Q\n                                -   \n50.00%\n0.000%\n0.00%\n=WCLTD\n9\nPreferred Stock\nLine 25 (b), Note B and Appendix III Note Q\n                                -   \n0.00%\n0.00%\n0.00%\n10\nCommon Stock\nLine 7, Note C  and Appendix III Notes Q and T\n                                -   \n50.00%\n9.80%\n4.900%\n11\nTotal\n(Sum of Lines 8 through 10)\n                                -   \n4.90%\n=R\n(a)\n(b)\n( c ) \n(d) \n( e ) \nMonthly Balances for Capital Structure\n12\nDecember (Prior Year)\n                               -                                 -                             -                                   -                                 -   \n13\nJanuary\n                               -                                 -                             -                                   -                                 -   \n14\nFebruary\n                               -                                 -                             -                                   -                                 -   \n15\nMarch\n                               -                                 -                             -                                   -                                 -   \n16\nApril\n                               -                                 -                             -                                   -                                 -   \n17\nMay\n                               -                                 -                             -                                   -                                 -   \n18\nJune\n                               -                                 -                             -                                   -                                 -   \n19\nJuly\n                               -                                 -                             -                                   -                                 -   \n20\nAugust\n                               -                                 -                             -                                   -                                 -   \n21\nSeptember\n                               -                                 -                             -                                   -                                 -   \n22\nOctober\n                               -                                 -                             -                                   -                                 -   \n23\nNovember\n                               -                                 -                             -                                   -                                 -   \n24\nDecember\n                               -                                 -                             -                                   -                                 -   \n25\n13-Month Average\n                               -                                 -                             -                                   -                                 -   \nNotes\nA\nB\nPreferred Stock balance will reflect the 13 month average of the balances, of which the 1st and 13th are found on page 112 line 3.c in the Form No. 1\nC\nCommon Stock balance will reflect the 13 month average of the balances, of which the 1st and 13th are found on Form 1 page 112 line 16.c less lines 3.c , 12.c, and 15.c\nD\nLong-term interest will exclude any short-term interest included in FERC Account 430, Interest on Debt to Associated Companies\nLong Term Debt \n(Note A)\nPreferred Stock \n(112.3.c)\nProprietary \nCapital (112.16.c)\nUndistributed Sub \nEarnings 216.1 \n(112.12.c)\nAccum Other Comp. \nIncome 219 \n(112.15.c)\nLong Term debt balance will reflect the 13 month average of the balances, of which the 1st and 13th are found on page 112, lines 18.c to 21.c, in the Form No. 1; the cost is calculated by \ndividing line 1 by the Long Term Debt balance on line 8."},{"page":510,"startToken":181144,"endToken":181493,"text":"Page 1 of 1\nFor the twelve months ended 12/31/\nAttachment 6\nInterest on True-Up\nDesertLink, LLC\nAppendix III K23\nLine\nRate Year\nRate Year\nProjected Revenue Requirement (Note A)\n1\n                                                                                         -   \nLess\n $                             -   \nEquals\n $                        -   \nNote A - Projected ATRR for the true-up year from Page 1, Line 1 of Projection Appendix III minus Line 6 of Projection Appendix III.\nNote B - Actual Net ATRR for the true-up year from Page 1, Line 9 of True-Up Appendix III.\nInterest Rate on Amount of Refunds or Surcharges\nMonths\nAmortization\n2\n0.000%\nAn over or under collection will be recovered pro rata over year collected, held for one year and returned pro rata over next year\nMonthly\n3\nJanuary\nRate Year\n                                -   \n0.000%\n12\n                          -   \n                              -   \n4\nFebruary\nRate Year\n                                -   \n0.000%\n11\n                          -   \n                              -   \n5\nMarch\nRate Year\n                                -   \n0.000%\n10\n                          -   \n                              -   \n6\nApril\nRate Year\n                                -   \n0.000%\n9\n                          -   \n                              -   \n7\nMay\nRate Year\n                                -   \n0.000%\n8\n                          -   \n                              -   \n8\nJune\nRate Year\n                                -   \n0.000%\n7\n                          -   \n                              -   \n9\nJuly\nRate Year\n                                -   \n0.000%\n6\n                          -   \n                              -   \n10\nAugust\nRate Year\n                                -   \n0.000%\n5\n                          -   \n                              -   \n11\nSeptember\nRate Year\n                                -   \n0.000%\n4\n                          -   \n                              -   \n12\nOctober\nRate Year\n                                -   \n0.000%\n3\n                          -   \n                              -   \n13\nNovember\nRate Year\n                                -   \n0.000%\n2\n                          -   \n                              -   \n14\nDecember\nRate Year\n                                -   \n0.000%\n1\n                          -   \n                              -   \n15\n                          -   \n                              -   \nAnnual\n16\nJanuary through December\nRate Yr. + 1                                 -   \n0.000%\n12\n                          -   \n                              -   \nOver (Under) Recovery Plus Interest Amortized and Recovered Over 12 Months\nMonthly\n17\nJanuary\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n18\nFebruary\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n19\nMarch\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n20\nApril\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n21\nMay\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n22\nJune\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n23\nJuly\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n24\nAugust\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n25\nSeptember\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n26\nOctober\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n27\nNovember\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n28\nDecember\nRate Yr. + 2                                 -   \n0.000%\n                          -                                 -                                 -   \n29\n                          -   \n30\nTotal Amount of True-Up Adjustment\n $                           -   \n31\nLess Over (Under) Recovery\n $                        -   \n32\nTotal Interest\n $                           -   \nActual Net Revenue \nRequirement (Note B)\nOver (Under) \nRecovery\nOver (Under) \nRecovery Plus \nInterest\nMonthly Interest \nRate on Attachment \n6a\nCalculated \nInterest\nSurcharge (Refund) \nOwed\nCalculation of Interest"},{"page":511,"startToken":181493,"endToken":181655,"text":"Page 1 of 1\nFor the twelve months ended 12/31/\nAttachment 6a\nTrue-Up Interest Rate Calculator\nDesertLink, LLC\nThis Attachment is used to compute the interest rate to be applied to each year's revenue requirement true-up.\nApplicable FERC Interest Rate (Note A):\n1\nRate Year January\n0.00%\n2\nRate Year February\n-\n3\nRate Year March\n-\n4\nRate Year April\n-\n5\nRate Year May\n-\n6\nRate Year June\n-\n7\nRate Year July\n-\n8\nRate Year August\n-\n9\nRate Year September\n-\n10\nRate Year October\n-\n11\nRate Year November\n-\n12\nRate Year December\n-\n13\nRate Year Plus 1  January\n-\n14\nRate Year Plus 1  February\n-\n15\nRate Year Plus 1  March\n-\n16\nRate Year Plus 1  April\n-\n17\nRate Year Plus 1  May\n-\n18\nAverage Rate\n0.00%\n19\nMonthly Average Rate\n0.00%\nNote A - Lines 1-17 are the FERC interest rates under section 35.19a of the regulations for the period shown. Line 18 is the average of lines 1-17."},{"page":512,"startToken":181655,"endToken":181924,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 7\nWeighted Average Federal and State Income Tax Rates\nDesertLink, LLC\nSubchapter C\nMutual\nPensions, IRAs\nUBTI\nNon-Taxpaying\nWeighted \nLine\nDescription\nSource\nCorporations\nIndividuals\nFunds\nKeogh Plans\nEntities\nEntities\nAverage\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n1\nWeighted Marginal Federal Income Tax Rate\nNote A\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n2\nAllocated Income Percentage\nNote B\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n3\nWeighted Average \nLine 1 x Line 2\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n4\nWeighted Average Federal Income Tax Rate \nSum of Line 3, Col. (c)-(h)\n0.00%\n5\nWeighted Marginal State Income Tax Rate\nNote C\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n6\nAllocated Income Percentage\nNote B\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n7\nWeighted Average \nLine 5 x Line 6\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n0.00%\n8\nWeighted Average State Income Tax Rate\nSum of Line 7, Col. (c)-(h)\n0.00%\nA\nFor each Rate Year, DesertLink will develop a schedule calculating the weighted average federal income tax rate for each category of partners. \nB\nThis percentage is developed based on the distributive income allocated to each category of partners rather than their respective ownership percentages.\nC\nFor each Rate Year, DesertLink will develop a schedule calculating the weighted average state income tax rate for each category of partners."},{"page":513,"startToken":181924,"endToken":182508,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 8\nCost of Debt Prior to Issuing Non-Construction Financing\nDesertLink, LLC\nThis Attachment 8 is to be utilized to determine the cost of debt prior to issuing non-construction financing.  Once non-construction financing is issued the cost of debt shall be determined using the methodology described in Note Q on Appendix III.\nIf construction debt has not or will not be issued when construction starts, a proxy rate will be used for the cost of debt, which will be supported in the initial section 205 filing. The proxy rate will be entered on line 36 of this attachment.\nIf construction financing is obtained, all rates, fees and monthly debt balances will be subject to true up pursuant to Attachment 9.\nAny hypothetical amounts in a filed template will be removed and replaced with actual amounts in the first year actual construction loans are borrowed or projected to be borrowed without the need for a section 205 filing to modify the template.\nLine No\n1\nInterest rate on Construction Debt for Rate Year - Line 19 (g)\n0.00%\n2\nRate Year Debt Fee expense - Line 35 (e)\n0.00%\n3\nTotal Cost of Debt - Sum of Lines 1 and 2\n0.0000%\nInterest Rate Information\n4\nCommitment Fee Rate (%)\n5\nProjected Average Drawn Rate for Rate Year (%) - Note A\nMonth During Rate Year\nTotal Loan Amount ($000)\nInterest Expense ($000)\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n6\nDecember Prior Year\n                            -                                         -                                          -                                          -   \n7\nJanuary\n                            -                                         -                                          -                                          -   \n8\nFebruary\n                            -                                         -                                          -                                          -   \n9\nMarch\n                            -                                         -                                          -                                          -   \n10\nApril\n                            -                                         -                                          -                                          -   \n11\nMay\n                            -                                         -                                          -                                          -   \n12\nJune\n                            -                                         -                                          -                                          -   \n13\nJuly\n                            -                                         -                                          -                                          -   \n14\nAugust\n                            -                                         -                                          -                                          -   \n15\nSeptember\n                            -                                         -                                          -                                          -   \n16\nOctober\n                            -                                         -                                          -                                          -   \n17\nNovember\n                            -                                         -                                          -                                          -   \n18\nDecember\n                            -                                         -                                          -                                          -   \n19\nAverage of the 13 Monthly Balances\n                            -   \n                                        -                                          -   \n0.00%\nExample Fee Calculation - All amounts represent actual rate year expenses.\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\nOrigination Fees           \nRate/Fees\nGross Fee Amount ($000)\nYear Fee Incurred\n20\nUnderwriting Discount\n0.00%\n -\n -\n21\nArrangement Fee\n0.00%\n -\n -\n22\nUpfront Fee\n0.00%\n -\n -\n23\nRating Agency Fee\n0.00%\n -\n -\n24\nLegal Fees\n0.00%\n -\n -\n25\nOther\n0.00%\n -\n -\n26\n   Total Issuance Expense / Origination Fees - Sum of Lines 20-25\n -\n -\n -\n -\n27\n28\nAnnual Fees\n29\nAnnual Rating Agency Fee\n0.00%\nN/A\n -\nN/A\nN/A\n30\nAnnual Bank Agency Fee\n0.00%\nN/A                                      -   \nN/A\nN/A\n31\nUtilization Fee\n0.00%\nN/A\n -\nN/A\nN/A\n32\nOther Fees\n0.00%\nN/A\n -\nN/A\nN/A\n33\nTotal Fees\n -\n -\n -\n -\n34\n13 Month Average Debt balance - Line 19 (c)\n                                        -   \n35\nRate Year cost of fees\n0.00%\n36\nProxy Debt rate. Used prior to issuance of construction financing and supported in initial section 205 filing.\n3.2220%\nNotes\nA\nLIBOR\n0.0000%\nSpread\n2.3500%\nTotal\n2.3500%\nIf construction financing has been obtained, the cost of debt prior the issuance of non-construction financing shall be based on the terms of the construction financing and determined below. Up-front fees including origination fees will be amortized and \nincluded in the cost of debt.\nPrincipal Drawn \n($000)\nUnutilized Loan \nBalance ($000)\nCommitment Fee & \nUtilization Fee ($000)\nEffective Annual \nInterest Rate (%)\nFee Amortization Period \n(years)\nRate Year Amortized Fee \nAmount, col. b / col. d\nPrior Years Accumulated \nFee Amortization\nUnamortized Balance \n- End of Rate Year\nProjected rate will be Average LIBOR for rate year + spread. Spread will be supported in initial section 205 filing. LIBOR will be updated based on information in the Wall Street Journal as of the 15th day of the month prior to population of this \ntemplate."},{"page":514,"startToken":182508,"endToken":182864,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 9\nTrue-Up - Construction Financing Cost of Debt\nDesertLink, LLC\nOne time up-front debt fees, including origination fees will be amortized and included in the cost of debt.\nLine No.\n$\n1\nLong Term Interest and Fees (117, sum of 62.c through 67.c) -- Notes A and B\n                                    -   \n2\nLine of Credit Fees (68.c) -- Note C\n                                    -   \n3\nTotal Interest and Fees\n                                    -   \n13 Month Average Long-Term Debt - Notes A and D\nMonth During Rate Year\nLong Term Debt\n(a)\n(d)\n4\nDecember Prior Year\n                                    -   \n5\nJanuary\n                                    -   \n6\nFebruary\n                                    -   \n7\nMarch\n                                    -   \n8\nApril\n                                    -   \n9\nMay\n                                    -   \n10\nJune\n                                    -   \n11\nJuly\n                                    -   \n12\nAugust\n                                    -   \n13\nSeptember\n                                    -   \n14\nOctober\n                                    -   \n15\nNovember\n                                    -   \n16\nDecember\n                                    -   \n17\nAverage of the 13 Monthly Balances\n                                    -   \n18\nTrue-Up Cost of Debt (Line 3 / Line 17)\n0.00%\nNotes\nA\nB\nLong-term interest will exclude any short-term interest included in FERC Account 430, Interest on Debt to Associated Companies.\nC\nLine of credit fees will include only those related to long-term debt and not for short-term debt.\nD\nLong-term debt will exclude any short-term debt included in FERC Account 233, Notes Payable to Associated Companies.\nThis Attachment 9 is to be utilized only in the event construction financing has been obtained to compute the actual cost of debt to be included in the return on rate base calculation for the true-up each year prior to the \nissuance of non-construction financing. Once non-construction financing has been obtained the cost of debt shall be determined using the methodology described in Note Q on Appendix III.\nAny hypothetical amounts in a filed template will be removed and replaced with actual amounts in the first year actual construction loans are borrowed or projected to be borrowed without the need for a section 205 \nfiling to modify the template.\nLong Term debt balance will reflect the 13 month average of the balances, of which the 1st and 13th are found on page 112, line 24, columns d and c, respectively, in the Form No. 1; the cost is calculated by \ndividing line 1 by the Long Term Debt balance on line 8."},{"page":515,"startToken":182864,"endToken":183098,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 10\nDepreciation Rates\nDesertLink, LLC\nTRANSMISSION AND GENERAL PLANT DEPRECIATION RATES\nAnnual Depreciation Rates\nLine No.\n(Note A)\nINTANGIBLE PLANT\n1\n303.1\nContributions in Aid of Construction\nNote B\n2\n303.2\nInterconnections\n2.27% \n3\n303.3\nLicenses\n1.59%\nTRANSMISSION PLANT\n4\n350.2\nLand Rights\n1.43%\n5\n351.1\nComputer Hardware\n20.00%\n6\n352.0\nStructures & Improvements\n1.95%\n7\n353.0\nStation Equipment\n2.58%\n8\n354.0\nTowers & Fixtures\n1.86%\n9\n355.0\nPoles & Fixtures\n2.17%\n10\n356.0\nOverhead Conductors & Devices\n2.01%\n11\n392.0\nTransportation Equipment\n10.00%\n12\n393.0\nStores Equipment\n6.67%\n13\n394.0\nTools, Shop, and Garage Equipment\n12.50%\n14\n397.2\nComputer Software\n11.64%\nNotes\nA\nThese depreciation rates will not be changed absent a FERC order.\nB\nGENERAL PLANT\nIn the event a Contribution in Aid of Construction (CIAC) is made for a transmission facility, the transmission depreciation rates above will be \nweighted based on the relative amount of underlying plant booked to the accounts shown in lines 4-12 above, and the resultant weighted average \ndepreciation rate will be used to amortize the CIAC.   The CIAC depreciation rate for each facility will be determined at the time the plant is \nplaced into service, and will not change  without FERC approval."},{"page":516,"startToken":183098,"endToken":183336,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 11\nPrior Period Adjustments\nDesertLink, LLC\n(a)\n(b)\nCalendar Year\nLine No. Description\nSource\nRevenue Impact of Correction\nRevenue Requirement\n1\nFiling Name and Date\n                                                        -   \n2\nOriginal Revenue Requirement\n                                                              -   \n3\n4\nDescription of Correction 1\n                                                              -   \n5\nDescription of Correction 2\n                                                              -   \n6\n7\nTotal Corrections\nLine 4 + 5\n                                                              -   \n8\n9\nCorrected Revenue Requirement\nLine 2 + 7\n                                                              -   \n10\n11\n12\nTotal Corrections\nLine 7\n                                                              -   \n13\n14\nAverage Monthly FERC Refund Rate\nNote A\n0.00%\n15\nNumber of Months of Interest\nNote B\n30\n16\nInterest on Correction\nLine 12 x 14 x 15\n                                                              -   \n17\n18\nTotal Annual Amount Due from / (to) Customers\nLine 12 + 16\n                                                              -   \nNotes\nA\nB\nThe interest rate on corrections will be the average monthly FERC interest rate for the period from the beginning of the year being corrected through the most recent  month available as of \nthe time the correction is computed and included in an annual filing.\nThe number of months interest due on the correction will be the number of months from the beginning of the year being corrected through June of the year in which the correction will be \nreflected in rates. In this manner the interest computed will reflect all years prior to when the correction is reflected in rates plus interest on the average unrefunded balance of the \ncorrection during the year the correction is reflected in rates."},{"page":517,"startToken":183336,"endToken":183548,"text":"Page 1 of 1\nFor the twelve months ended 12/31/__\nAttachment 12\nRevenue Credit Detail\nDesertLink, LLC\n(a)\n(b)\n(c) = (a) - (b)\nLine No.\n(Note A)\nSource\nCompany Total\nLess: Non Transmission\nTransmission-related\n1\nAccount 454 - Rent from Electric Property\n2\nJoint pole attachments - telephone\nCompany books\n                                          -                                                      -                                                                                                                 -   \n3\nJoint pole attachments - cable\nCompany books\n                                          -                                                      -                                                                                                                 -   \n4\nUnderground rentals\nCompany books\n                                          -                                                      -                                                                                                                 -   \n5\nTransmission tower wireless rentals\nCompany books\n                                          -                                                      -                                                                                                                 -   \n6\nOther rentals\nCompany books\n                                          -                                                      -                                                                                                                 -   \n7\nOther rentals\nCompany books\n                                          -                                                      -                                                                                                                 -   \n8\nAccount 454 Revenue Credit\nForm 1 300.19.b\n                                          -                                                      -                                                                                                                 -   \n9\nAccount 456.1 Other Operating Revenues\n10\nCAISO NITS\nCompany books\n                                          -                                                      -                                                                                                                 -   \n11\nCAISO Point to Point\nCompany books\n                                          -                                                      -                                                                                                                 -   \n12\nOver/Under recovery deferral\nCompany books\n                                          -                                                      -                                                                                                                 -   \n13\nOther Transmission Service Revenues\nCompany books\n                                          -                                                      -                                                                                                                 -   \n14\nOther\nCompany books\n                                          -                                                      -                                                                                                                 -   \n15\nTotal Per Books\nForm 1 330.n\n                                          -                                                      -                                                                                                                 -   \n16\nLess: revenues received pursuant to this Formula Rate\n                                          -                                                      -                                                                                                                 -   \n17\nLess: Over/Under recovery deferral\n                                          -                                                      -                                                                                                                 -   \n17a\nLess: Revenue Credits included in the TRBAA\n                                          -                                                      -                                                                                                                 -   \n18\nAccount 456.1 Revenue Credit\n                                          -                                                      -                                                                                                                 -   \n19\nTotal Revenue Credits\n(Line 8 + line 18)\n                                          -                                                      -                                                                                                                 -   \nNote A\nAll 454 and 456.1 revenues will be detailed from Company books and records or FERC Form 1, and additional rows added if necessary.  Non-transmission-related amounts will be deducted to determine transmission-related amounts.\n(Line 15 - line 16 - line 17 \n- line 17a)"},{"page":518,"startToken":183548,"endToken":183970,"text":"DesertLink, LLC\nAttachment 13 - Excess or Deficient Accumulated Deferred Income Taxes - Summary\n[Year] \n[Projected or Actual]\nLine No. \n1\n2\n[List of tax law changes, accounting treatment, and asscociated explanatory notes.]\n3\nRate Base Adjustment Mechanism - Summary\n4\nAccount\nAmount\nReferences\n5\n182.3 (debit or <credit>)\n                        -   \n6\n254 (debit or <credit>)\n                        -   \n7\nTotal Deficient or (Excess) ADIT (sum of lines 5-6)\n                        -   To Appendix III, Page 2, Line 22a, Col. (3)\n8\n9\nIncome Tax Allowance Adjustment Mechanism - Summary\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n10\n11\n[Insert rows as necessary]\n                        -   \n                        -   \n11a\n[Insert rows as necessary]\n                        -   \n                        -   \n11…\n[Insert rows as necessary]\n                        -   \n                        -   \n12\nTotal\n(sum of lines 11_)\n                        -   \n                        -   \n13\n14\n[Explanatory statements as needed]  \nThe primary purposes of this worksheet are to: \n - reconcile the amounts of regulatory assets and liabilities comprising the rate base adjustment mechanism on Appendix III, Page 2, Line 22a (ADJUSTMENTS TO RATE BASE > Deficient or (Excess) ADIT) as of the beginning and end of the current test \nperiod (summarized beginning at Line 3 below) and \n- to support the amount of excess deferred tax expense or benefit recognized due to enacted change(s) in tax rate(s) on Appendix III, Page 3, Line 40 (INCOME TAXES > Deficient or (Excess) Deferred Income Taxes) and the effect of such excess deferred \ntax expense or benefit on the revenue requirement as reflected in the income tax allowance adjustment mechanism on Appendix III, Page 3, Line 44 (INCOME TAXES > Deficient or (Excess) Deferred Income Tax Adjustment) during the test period \n(summarized beginning on Line 9 below).  \nThis worksheet supports the computation of the projected revenue requirement or, as appropriate, the actual revenue requirement used to compute the true-up adjustment.\nEach tax law change addressed by this worksheet with its associated explanatory note is listed below.  Amounts related to each tax law change are provided and supported throughout this worksheet.  Additional lines and explanatory notes will be added to \nthis worksheet as necessary as tax law changes are enacted without the need for an FPA Section 205 filing. \nThe amounts summarized above are computed in the Rate Base Adjustment Mechanism-Reconciliation of Beginning and End of Test Period Balances section of the worksheet with proration and averaging of activity during the test period computed in \ndifferent section of Attachment 13.1 for projected revenue requirement calculations and actual revenue requirement calculations.\n Amortization or \nMitigation of \nDeficient or \n<Excess> ADIT \n Tax Gross-up \nFactor \n Amortization or \nMitigation with \nTax Gross-up \n To Appendix III, \nPage 3, Line 40, \nCol. (3) \n To Appendix III, \nPage 3, Line 44, \nCol. (3)"},{"page":519,"startToken":183970,"endToken":184468,"text":"15\nRate Base Adjustment Mechanism - Reconciliation of Beginning and End of Test Period Balances\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n(j)\n16\nDescription (+ = debit, <> = credit)\nAmortization period and method\n17\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n17a\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n17b\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n17...\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n18\nTotal for account 182.3\n(sum of lines 17_)\n                        -                           -                           -                           -                           -   \n19\n FN1. pg 232 \n FN1. pg 232 \n20\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n20a\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n20b\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n20...\n[Insert rows as necessary]\n                        -                           -                           -                           -                           -   \n21\nTotal for account 254\n(sum of lines 20_)\n                        -                           -                           -                           -                           -   \n22\n FN1. pg 278 \n FN1. pg 278 \n23\n24\nIncome Tax Allowance Adjustment Mechanism\n25\n26\nAmortization of Excess or Deficient ADIT\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n(j)\n27\nDescription (+ = debit, <> = credit)\nComments\n28\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n28a\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n28b\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n28...\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n29\nTotal for account 182.3\n(sum of lines 28_)\n                        -                           -                           -                           -                            -   \n30\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n30a\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n30b\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n30...\n[Insert rows as necessary]\n                        -                           -                           -                           -                            -   \n31\nTotal for account 254 \n(sum of lines 30_)\n                        -                           -                           -                           -                            -   \n32\nTotal amortization and offsetting entries\n(sum of lines 29 & 31)                         -                           -                           -                           -                            -   \n33\nNet income tax expense or benefit\n(sum of lines 32(f) & 32(g))\n                        -   \n To line 11 \nBalance at \nBeginning of \nYear\nRe-\nmeasurement of \nADIT\nAnnual \nAmortization \n(Note 4)\nOther \nAdjustments\n(Note 5)\nBalance at End \nof Year \n(d)+(e)+(f)+\n(g)\nWhether subject \nto normalization \nrules\n(Note 6)\nAnalysis - Balances of tax-related regulatory assets and liabilities include tax gross-up.  Accordingly, for the regulatory assets and liabilities for deficient or excess deferred taxes included in rate base, the related deferred tax assets and liabilities are also \nincluded in rate base.  Remeasurements in column (e) are described in Notes 2 and 3 and are based on the journal entry below and the support on the worksheet for the applicable tax law change.  Averaging or proration of amounts affecting rate base is \ncomputed on different sections of Attachment 13.1 for projected revenue requirement and actual revenue requirement. \nThe income tax allowance adjustment mechanism may include amortization of excess or deficient ADIT pertaining to deferred tax expense or benefit reflected in rates at a historical tax rate when the underlying timing difference(s) originated (computed \nunder Amortization of Excess or Deficient ADIT within the Income Tax Allowance Adjustment Mechanism section of this worksheet) as well as an adjustment for tax law changes with prospective effective dates intended to mitigate the over- or under-\nrecovery of deferred income taxes originating prior to the effective date of such tax law changes (computed under Adjustment for Tax Law Changes with Prospective Effective Dates within the Income Tax Allowance Adjustment Mechanism section of this \nworksheet).\nAnnual \nAmortization \nfrom Table \nAbove\n(Note 4)\nDebit or \n<Credit> to \nAccount 410.1\nDebit or \n<Credit> to \nAccount 411.1\nDebit or \n<Credit> to \nAccount 190\nDebit or \n<Credit> to \nAccount 283"},{"page":520,"startToken":184468,"endToken":185041,"text":"34\nAdjustment for Tax Law Changes with Prospective Effective Dates\n35\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n(j)\n(k)\n36\n37\n (c) x (d) \n1 / (1- (d))\n (e) x (f) \n - [(c) x (h)] \n (e) + (i) \n (j) x (f) \n38\n[Insert rows as necessary]\n                        -   \n                        -   \n                         -                           -                           -   \n To line 11 \n38…\n[Insert rows as necessary]\n                        -   \n                        -   \n                         -                           -                           -   \n To line 11 \n39\nNote 1 - Summary of re-measurement of ADIT resulting from tax law changes\n40\n41\nNote 1a - Summary of re-measurement of ADIT resulting from \n[name of tax law change]\nAdditional information is provided in Note \n42\nRe-measurement entry \n(a)\n(b)\n(c) \n43\nAccount\nComments or References\n44\n190\n45\n281\n46\n282\n47\n283\n48\n182.3 (tax-related, included in rate base - protected)\n49\n182.3 (tax-related, included in rate base - unprotected)\n50\n182.3 (tax-related, not in rate base))\n51\n190 (related to portion of acct. 182.3 not in rate base)\n52\n254 (tax-related, included in rate base - protected)\n53\n254 (tax-related, included in rate base - unprotected)\n54\n254 (tax-related, not in rate base)\n55\n283 (related to portion of acct. 254 not in rate base)\n56\nAccount 410.1\n57\nAccount 411.1\n58\nAccount 410.2\n59\nAccount 411.2\n60\nTotal\n (sum of lines \n                        -   \n61\n[Insert additional analysis.]\nIn the case of tax law changes with an effective date(s) after the beginning of the test period, the impact of a timing difference on current tax expense or benefit differs from the impact on ADIT.  For example, in the case \nof a deductible timing difference originating in a tax year with a higher enacted tax rate than will apply when the difference will reverse, the current tax benefit will exceed the deferred tax expense.  In this situation, the \nadjustment computed below to recoverable income tax expense is made in order to avoid over-recovering income tax expense in the current test period due to the excess of current tax benefit over deferred tax expense \n(computed based on the estimated amount of the future tax liability) with respect to a given timing difference.  The adjustment to recoverable tax expense during the test period in which a timing difference originates \nmitigates the need for refund of a regulatory liability for excess deferred taxes in a future period (or, as applicable, the need for recovery of a regulatory asset for deficient deferred taxes in a future period).  Amounts in \ncolumn (i) are reported in the Income Tax Allowance Adjustment Mechanism - Summary on this worksheet.\n Originating \nTaxable or \n(Deductible) \nBook / Tax \nDifference for \nTest Year \n Tax Rate for \nTest Year \n Current Tax \nExpense or \n(Benefit) in Test \nYear \n Tax Gross-up \nFactor for Test \nYear \n Revemue \nRequirement \nImapct for Test \nYear \n Enacted Tax \nRate for the \nReversal Year(s) \n Deferred Tax \nExpense or \n(Benefit) in Test \nYear \n Total Tax \nExpense or \n(Benefit) in Test \nYear \n Adjustment to \nMitigate \nOver/under-\nrecovery of \nDeferred Taxes  \nThe purposes of this portion of the worksheet are, for each change in tax law, to explain: \n- how any ADIT accounts were re-measured, \n- the excess or deficient ADIT contained therein, and \n- the accounting for any excess or deficient amounts in Accounts 182.3 (Other Regulatory Assets) and 254 (Other Regulatory Liabilities).\nNote 2 describes how ADIT accounts are re-measured upon a change in income tax law.  A separate summary (i.e., Note 1a, Note 1b, etc.) will be added for each tax law change resulting in a re-measurement of ADIT.\nDebit or \n<Credit>"},{"page":521,"startToken":185041,"endToken":185591,"text":"62\nNote 1b - Summary of \n[name of tax law change]\nAdditional information is provided in Note \n63\n[Insert additional analysis.]\n64\nNote 1b - Summary of \n[name of tax law change]\nAdditional information is provided in Note \n65\n66\n67\n68\n69\n[Continuation of note with respect to particular changes in tax law.]\n70\n[Insert additional notes as needed.]\nNote 2 - Explanation of how ADIT accounts are re-measured upon a change in income tax law\nDeferred tax assets and liabilities are adjusted (re-measured) for the effect of the changes in tax law (including tax rates) in the period that the change is enacted.  Adjustments are recorded in the appropriate deferred tax \nbalance sheet accounts (Accounts 190, 281, 282 and 283) based on the nature of the temporary difference and the related classification requirements of the accounts.   If as a result of action or expected action by a \nregulator, it is probable that the future increase or decrease in taxes payable due to the change in tax law or rates will be recovered from or returned to customers through future rates, a regulatory asset or liability is \nrecognized in Account 182.3 (Other Regulatory Assets), or Account 254 (Other Regulatory Liabilities), as appropriate, for that probable future revenue or reduction in future revenue.  Re-measurements of deferred tax \nbalance sheet accounts may also result in re-measurements of tax-related regulatory assets or liabilities that had been recorded prior to the change in tax law.  If it is not probable that the future increase or decrease in taxes \npayable due to the change in tax law or rates will be recovered from or returned to customers through future rates, tax expense is recognized in Account 410.2 (Provision for Deferred Income Taxes, Other Income or \nDeductions) or tax benefit is recognized in Account 411.2 (Provision for Deferred Income Taxes-Credit, Other Income or Deductions), as appropriate.  \nNote 3 - [Complete to support information above.]\nNote 4 - The amortization of the deficient or excess ADIT reducing Account 254 (Other Regulatory Liabilities) is recorded with credits to Account 411.1 (Provision for Deferred Income Taxes – Credit, Utility Operating \nIncome) and to Account 190 (Accumulated Deferred Income Taxes) or Account 283 (Accumulated Deferred Income Taxes—Other), as appropriate, in accordance with the Commission’s Accounting for Income Taxes \nGuidance.  The amortization of the deficient or excess ADIT reducing Account 182.3 (Other Regulatory Assets) is recorded with debits to Account 410.1 (Provision for Deferred Income Taxes, Utility Operating Income) \nand to Account 190 (Accumulated Deferred Income Taxes) or Account 283 (Accumulated Deferred Income Taxes—Other), as appropriate, in accordance with the Commission’s Accounting for Income Taxes Guidance.  \nThis activity is summarized in the table \"Income Tax Allowance Mechanism - Projected\" or the table \"Income Tax Allowance Mechanism - Actual,\" as appropriate.  The annual amortization in the tables above reflects tax \ngross-up and is stated at the revenue requirement level. \nNote 5 - [Complete to support information above.]\nNote 6 -  The worksheet indicates whether each excess or deficient ADIT amounts are protected (i.e., subject to normalization rules of a taxing jurisdiction) or unprotected (i.e., not subject to normalization rules of a taxing \njurisdiction).  To the extent that normalization requirements apply to ADIT remeasurements, additional computations (e.g., proration of excess deferred tax activity related to future test periods) may be necessary."},{"page":522,"startToken":185591,"endToken":185980,"text":"DesertLink, LLC\nAttachment 13.1 - Regulatory Assets/Liabilities for Deficient/Excess ADIT - Averaging and Proration Adjustments \nSupport for Attachment 13 (Excess or Deficient Accumulated Deferred Income Taxes - Summary)\n[Year] \n[Projected or Actual]\nLine No.\n1\nRate year =\n2\nTest period days after rates become effective\n3\n4\nAccount 182.3 - Other Regulatory Assets (portion related to deficient or excess ADIT)\n5\n6\nBeginning balance  (debit or <credit>)\n                        -   \n7\nLess:  Portion not related to transmission\n                        -   \n8\nLess:  Portion not reflected in rate base\n                        -   \n9\nSubtotal:  Portion reflected in rate base\n                        -   \n10\nLess:  Portion subject to proration\n                        -   \n11\nPortion subject to averaging  (debit or <credit>)\n                        -   \n12\nEnding balance  (debit or <credit>)\n                        -   \n13\nLess:  Portion not related to transmission\n                        -   \n14\nLess:  Portion not reflected in rate base\n                        -   \n15\nSubtotal:  Portion reflected in rate base\n                        -   \n16\nLess:  Portion subject to proration (before proration)\n                        -   \n17\nPortion subject to averaging (before averaging)  (debit or <credit>)\n                        -   \n18\nEnding balance of portion subject to proration (prorated)  (debit or <credit>)\n                        -   From Line 36(n)\n19\nAverage balance of portion subject to averaging\n                        -   \n20\nAmount reflected in rate base  (debit or <credit>)\n                        -   To Att. 13, Line 5\nThis attachment includes sections that are populated only with actual data and thus, these sections remain blank when the formula rate template is \ncalculating a projected revenue requirement. Columns (i) through (n) below are not used for the projection and are only populated with actual data for the \nAnnual Update.   \nNote 1 - The computations below apply the proration rules of Treasury Regulation section 1.167(l)-1(h)(6) to the annual activity of the portions of the \ndeficient or excess accumulated deferred income taxes recorded in account 182.3 or 254 that are subject to the normalization requirements.  Activity \nrelated to the portions of the account balances reflected in rate base but not subject to the proration requirement is averaged instead of prorated.  The \nbalances below include tax gross-up.  The corresponding portions of the deferred tax asset related to the portions of the regulatory liability and the \ncorresponding portions of the deferred tax liability related to the portions of the regulatory asset are also reflected in rate base and prorated or averaged, \nas appropriate.  Columns (a) through (h) are used for projected and actual revenue requirements computations.  Columns (i) through (n) are used for \nactual revenue requirement computations.   \nAmount\ndebit / <credit>"},{"page":523,"startToken":185980,"endToken":186378,"text":"21\nAccount 182.3 - Other Regulatory Assets (portion related to deficient or excess ADIT)\nColumns (i) through (n) are not used for the calculation of the projected revenue requirement\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n(j)\n(k)\n(l)\n(m)\n(n)\n22\nMonth\nYear\n23\n \nprior month (d) + (c)\nLine 2\n[(c) x (e) / (f)]\nprior month (h) + (g)\n[Note 5]\n[Note 6]\n[Note 7]\n24\nDecember 31,\n-\n NA                               -   \nNA\n0\n NA                               -   \n NA \n NA \n NA \n NA \n NA                              -   \n25\nJanuary \n-\n                              -                                 -   \n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n26\nFebruary\n-\n                              -                                 -   \n307\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n27\nMarch \n-\n                              -                                 -   \n276\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n28\nApril\n-\n                              -                                 -   \n246\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n29\nMay\n-\n                              -                                 -   \n215\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n30\nJune\n-\n                              -                                 -   \n185\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n31\nJuly\n-\n                              -                                 -   \n154\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n32\nAugust \n-\n                              -                                 -   \n123\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n33\nSeptember\n-\n                              -                                 -   \n93\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n34\nOctober\n-\n                              -                                 -   \n62\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n35\nNovember\n-\n                              -                                 -   \n32\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n36\nDecember\n-\n                              -                                 -   \n1\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n37\nTotal \n                              -   \n                             -                                -   \n38\n39\nAccount 254 - Other Regulatory Liabilities (portion related to deficient or excess ADIT)\n40\n41\nBeginning balance  (debit or <credit>)\n                        -   \n42\nLess:  Portion not related to transmission\n                        -   \n43\nLess:  Portion not reflected in rate base\n                        -   \n44\nSubtotal:  Portion reflected in rate base\n                        -   \n45\nLess:  Portion subject to proration\n                        -   \n46\nPortion subject to averaging  (debit or <credit>)\n                        -   \n47\nEnding balance  (debit or <credit>)\n                        -   \n48\nLess:  Portion not related to transmission\n                        -   \n49\nLess:  Portion not reflected in rate base\n                        -   \n50\nSubtotal:  Portion reflected in rate base\n                        -   \n51\nLess:  Portion subject to proration (before proration)\n                        -   \n52\nPortion subject to averaging (before averaging)  (debit or <credit>)\n                        -   \n53\nEnding balance of portion subject to proration (prorated)  (debit or <credit>)\n                        -   From Line 70(n)\n54\nAverage balance of portion subject to averaging\n                        -   \n55\nAmount reflected in rate base  (debit or <credit>)\n                        -   To Att. 13, Line 6\nForecasted Monthly \nActivity\ndebit / <credit>\nForecasted \nMonth-end Balance\ndebit / <credit>\nDays until \nEnd of Test \nPeriod\nDays in Test \nPeriod\nProrated Forecasted \nMonthly Activity\ndebit / <credit>\nForecasted  Prorated \nMonth-end Balance\ndebit / <credit>\nActual Monthly \nActivity\nDifference between \nprojected monthly \nand actual monthly \nactivity.\nPreserve projected \nproration when actual \nmonthly and projected \nmonthly activity are \neither both increases \nor decreases.  \nFifty percent of the \ndifference between \nprojected and actual \nactivity when actual \nand projected activity \nare either both \nincreases or \ndecreases.  \nFifty percent of actual \nmonthly activity when \nprojected activity is \nan increase while \nactual activity is a \ndecrease OR projected \nactivity is a decrease \nwhile actual activity is \nan increase.\nBalance reflecting \nproration or \naveraging \n(i) - (c) \n [Note 4]\n(k) + (l) + (m) \n[Note 8]\nNote 2 - \nAmount\ndebit / <credit>"},{"page":524,"startToken":186378,"endToken":187054,"text":"56\nAccount 254 - Other Regulatory Liabilities (portion related to deficient or excess ADIT)\nColumns (i) through (n) are not used for the calculation of the projected revenue requirement\n(a)\n(b)\n(c)\n(d)\n(e)\n(f)\n(g)\n(h)\n(i)\n(j)\n(k)\n(l)\n(m)\n(n)\n57\nMonth\nYear\n58\n \nprior month (d) + (c)\nLine 2\n[(c) x (e) / (f)]\nprior month (h) + (g)\n[Note 5]\n[Note 6]\n[Note 7]\n58\nDecember 31,\n-\n NA                               -   \nNA\n0\n NA                               -   \n NA \n NA \n NA \n NA                              -   \n59\nJanuary \n-\n                              -                                 -   \n0\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n60\nFebruary\n-\n                              -                                 -   \n307\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n61\nMarch \n-\n                              -                                 -   \n276\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n62\nApril\n-\n                              -                                 -   \n246\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n63\nMay\n-\n                              -                                 -   \n215\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n64\nJune\n-\n                              -                                 -   \n185\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n65\nJuly\n-\n                              -                                 -   \n154\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n66\nAugust \n-\n                              -                                 -   \n123\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n67\nSeptember\n-\n                              -                                 -   \n93\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n68\nOctober\n-\n                              -                                 -   \n62\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n69\nNovember\n-\n                              -                                 -   \n32\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n70\nDecember\n-\n                              -                                 -   \n1\n0\n                              -                                 -   \n                             -                                -                                  -                                  -                                  -                                -   \n71\nTotal \n                              -   \n                             -                                -   \n72\n73\n74\n75\n76\n77\nForecasted Monthly \nActivity\ndebit / <credit>\nForecasted \nMonth-end Balance\ndebit / <credit>\nDays until \nEnd of Test \nPeriod\nDays in Test \nPeriod\nProrated Forecasted \nMonthly Activity\ndebit / <credit>\nForecasted  Prorated \nMonth-end Balance\ndebit / <credit>\nActual Monthly \nActivity\nDifference between \nprojected monthly \nand actual monthly \nactivity.\nPreserve projected \nproration when actual \nmonthly and projected \nmonthly activity are \neither both increases \nor decreases.  \nFifty percent of the \ndifference between \nprojected and actual \nactivity when actual \nand projected activity \nare either both \nincreases or \ndecreases.  \nFifty percent of actual \nmonthly activity when \nprojected activity is \nan increase while \nactual activity is a \ndecrease OR projected \nactivity is a decrease \nwhile actual activity is \nan increase.\nBalance reflecting \nproration or \naveraging \n(i) - (c) \n [Note 4]\n(k) + (l) + (m) \n[Note 8]\nNote 3 - \nNote 4  -  Column J is the difference between actual monthly and projected monthly activity (Column I minus Column C).  Specifically, if projected and \nactual activity are both positive, a negative in Column J represents over-projection (i.e., the amount of projected activity that did not occur) and a \npositive in Column J represents under-projection (i.e., the excess of actual activity over projected activity). If projected and actual activity are both \nnegative, a negative in Column J represents under-projection (i.e., the excess of actual activity over projected activity) and a positive in Column J \nrepresents over-projection (i.e., the amount of projected activity that did not occur). \nNote 5  -  Column K preserves the effects of excess ADIT proration from the projected revenue requirement when actual monthly excess ADIT activity \nand projected monthly excess ADIT activity are either both increases or decreases.  Specifically, if Column J indicates that excess ADIT activity was \nover-projected, enter Column G x [Column I / Column C].  If Column J indicates that excess ADIT activity was under-projected, enter the amount from \nColumn G and complete Column L).  In other situations, enter zero.\nNote 6  -  Column L applies when (1) Column J indicates that excess ADIT activity was under-projected AND (2) actual monthly and projected monthly \nactivity are either both increases or both decreases.  Enter 50 percent of the amount from Column J.  In other situations, enter zero.  The excess ADIT \nactivity in column L is multiplied by 50 percent to reflect averaging of rate base to the extent that the proration requirement has not been applied to a \nportion of the monthly excess ADIT activity.\nNote 7  -  Column M applies when (1) projected monthly activity was an increase while actual monthly activity was a decrease OR (2) projected monthly \nactivity was a decrease while actual monthly activity was an increase.  Enter 50 percent of the amount of actual monthly activity (Column I).  In other \nsituations, enter zero.  The excess ADIT activity in column M is multiplied by 50 percent to reflect averaging of rate base to the extent that the proration \nrequirement has not been applied to a portion of the monthly excess ADIT activity.\nNote 8  -  Column N is computed by adding the balance at the end of the prior month to EITHER (1) the sum of prorated monthly excess ADIT activity, \nif any, from Column K and the portion of monthly excess ADIT activity, if any, from Column L OR (2) the portion of monthly excess ADIT activity in \nColumn M."},{"page":525,"startToken":187054,"endToken":187557,"text":"DesertLink, LLC\nAttachment 13.2 - Re-measurement of ADIT and Tax-related Regulatory Assets and Liabilities Resulting from the Tax Change Identified in Line 1\nSupport for Attachment 13 (Excess or Deficient Accumulated Deferred Income Taxes - Summary)\n[Year] \n[Projected or Actual]\nLine No.\n1\n[Identify/describe the tax legislation/change]\n2\n[Describe the computation.]\n3\n4\n(a)\n(b)\n(c) \n(d)\n(e) \n(f)\n(g)\n(h)\n(i)\n(j)\n(k)\n(l)\n(m)\n(n)\n5\nBalances and rates prior to remeasurement\n[tax rate]\n[tax rate]\n[tax rate]\n[1/(1-tax rate)]\n[tax rate]\n6\nTemporary Difference\nAccount\nAccount\nAccount\nAccount\nAccount\n7\nItem\nNormalized?\nAmount\n190\n282\n283\n182.3\n283\n8\n[Insert rows as necessary]\n8a\n[Insert rows as necessary]\n8b\n[Insert rows as necessary]\n8...\n[Insert rows as necessary]\n9\nTotal\n                     -                      -                      -                      -                      - \n10\nRemeasured balances and rates\nOther accounts affected by remeasurement\n11\n[tax rate]\n[tax rate]\n[tax rate]\n[1/(1-tax rate)]\n[tax rate]\n[1/(1-tax rate [tax rate] /(1-tax rate [tax rate]\n12\nTemporary Difference\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\nAccount\n13\nItem\nNormalized?\nAmount\n190\n282\n283\n182.3\n283\n410.2\n411.2\n254\n190\n182.3\n283\n14\n[Insert rows as necessary]\n14a\n[Insert rows as necessary]\n14b\n[Insert rows as necessary]\n14...\n[Insert rows as necessary]\n15\nTotal\n                     -                      -                      -                      -                      - \n              -               -               -               -               -               - \n16\nRemeasurement journal entry:  debt or <credit> (to Attachment 13)\n                     -                      -                      -                      -                      - \n              -               -               -               -               -               - \n17\nSummary of Effects on Tax-related Regulatory Assets and Liabilities\n18\nAccount 182.3 - included in rate base, subject to normalization rules\n19\nAccount 182.3 - included in rate base, not subject to normalization rules\n20\nAccount 182.3 - not included in rate base\n21\nAccount 254 - included in rate base, subject to normalization rules\n22\nAccount 254 - included in rate base, not subject to normalization rules\n23\nAccount 254 - not included in rate base\nThe ratemaking treatment of each item in terms of whether it is subject to the normalization requirements (i.e., P or \"protected\") or not subject to the normalization requirements (i.e., U or \"unprotected\") \nand included in rate base or not (i.e., RB or non-RB) is indicated in column (b).  The balances are measured at the composite tax rate in effect immediately before effective date of the change in tax law and \nremeasured immediately after the change in tax law.  Each set of balances includes the appropriate income tax rates and tax gross-up factors (as computed in the specific note for this tax law change in Att. \n13).  The journal entry to record the remeasurements (Line 16) is based on the differences in balances of accounts recorded prior to the change in law (columns (d)-(h)) and activity in other accounts \nresulting from the remeasurement (columns (i)-(n)).  The remeasurement entry is also included in Att. 13.  The accounting is further described in Att. 13, Note 2. \nThis worksheet will be included in support of the revenue requirement computation until the excess or deficient ADIT is fully amortized.  A similar worksheet will be used for subsequent changes in tax \nlaw resulting in re-measurement of ADIT."},{"page":526,"startToken":187557,"endToken":187563,"text":"Ex. DLK-103 \n \nFormula Rate Template (Excel)"},{"page":527,"startToken":187563,"endToken":187570,"text":"Ex. DLK-204 \n \nIllustrative Formula Rate Template (Excel)"},{"page":528,"startToken":187570,"endToken":187576,"text":"Ex. DLK-205 \n \nIllustrative TRBAA Calculation (Excel)"},{"page":529,"startToken":187576,"endToken":187664,"text":"CERTIFICATE OF SERVICE \n \nPursuant to Rule 2010 of the Rules of Practice and Procedure of the Federal Energy \nRegulatory Commission, 18 C.F.R. § 385.2010, I hereby certify that I have this day caused a copy \nof the foregoing ﬁling of DesertLink, LLC to be served electronically upon each person designated \non the oﬃcial service list in Docket No. EL26-71-000 and upon each other person entitled to \nservice under the Commission’s regulations. \nDated at Washington, DC, this 16th day of November 2026. \n/s/ Alexandra Zak __ ___  \nAlexandra Zak"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":223,"startToken":0,"endToken":493},{"p":2,"at":223,"title":"I. INTRODUCTION AND SUMMARY OF FILING","method":"printed heading","endPage":3,"endAt":223,"startToken":493,"endToken":998},{"p":3,"at":223,"title":"II. BACKGROUND","method":"printed heading","endPage":3,"endAt":240,"startToken":998,"endToken":1000},{"p":3,"at":240,"title":"A. DesertLink and Its Formula Rate","method":"printed heading","endPage":3,"endAt":1420,"startToken":1000,"endToken":1174},{"p":3,"at":1420,"title":"B. Show Cause Order and Stakeholder Process","method":"printed heading","endPage":4,"endAt":558,"startToken":1174,"endToken":1571},{"p":4,"at":558,"title":"III. DESCRIPTION OF THE PROPOSED REVISIONS","method":"printed heading","endPage":4,"endAt":603,"startToken":1571,"endToken":1577},{"p":4,"at":603,"title":"A. Large Load Interconnection Framework (Section 10A and Appendix VI)","method":"printed heading","endPage":5,"endAt":1525,"startToken":1577,"endToken":2240},{"p":5,"at":1525,"title":"B. Pro Forma CRA (Appendix V)","method":"printed heading","endPage":8,"endAt":223,"startToken":2240,"endToken":3751},{"p":8,"at":223,"title":"C. Crediting CRA Amounts Through the TRBAA (Sections 3 and 5.5)","method":"printed heading","endPage":9,"endAt":714,"startToken":3751,"endToken":4447},{"p":9,"at":714,"title":"D. Formula Rate Template Revisions and Rate Treatment of Covered Upgrades","method":"printed heading","endPage":9,"endAt":2808,"startToken":4447,"endToken":4757},{"p":9,"at":2808,"title":"E. Supporting Testimony and Illustrative Exhibits","method":"printed heading","endPage":10,"endAt":1517,"startToken":4757,"endToken":5106},{"p":10,"at":1517,"title":"IV. THE PROPOSED REVISIONS ARE JUST AND REASONABLE","method":"printed heading","endPage":11,"endAt":1380,"startToken":5106,"endToken":5639},{"p":11,"at":1380,"title":"V. REQUESTED EFFECTIVE DATE AND WAIVERS","method":"printed heading","endPage":11,"endAt":2119,"startToken":5639,"endToken":5744},{"p":11,"at":2119,"title":"VI. CONTENTS OF FILING","method":"printed heading","endPage":12,"endAt":663,"startToken":5744,"endToken":5962},{"p":12,"at":663,"title":"VII. COMMUNICATIONS AND SERVICE","method":"printed heading","endPage":13,"endAt":224,"startToken":5962,"endToken":6247},{"p":13,"at":224,"title":"VIII. CONCLUSION","method":"printed heading","endPage":15,"endAt":46,"startToken":6247,"endToken":6307},{"p":15,"at":46,"title":"Table of Contents","method":"printed heading","endPage":61,"endAt":83,"startToken":6307,"endToken":23168},{"p":61,"at":83,"title":"Table of Contents","method":"printed heading","endPage":72,"endAt":4310,"startToken":23168,"endToken":28468},{"p":72,"at":4310,"title":"I. Col. J computes the total true-up as the sum of Col. G, H and I.","method":"printed heading","endPage":169,"endAt":6,"startToken":28468,"endToken":61985},{"p":169,"at":6,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":203,"endAt":664,"startToken":61985,"endToken":75661},{"p":203,"at":664,"title":"I. Large Load Interconnection Customer (ECLL) Contact Information","method":"printed heading","endPage":203,"endAt":827,"startToken":75661,"endToken":75681},{"p":203,"at":827,"title":"II. Large Load Customer Information","method":"printed heading","endPage":203,"endAt":1207,"startToken":75681,"endToken":75737},{"p":203,"at":1207,"title":"III. Point of Interconnection","method":"printed heading","endPage":204,"endAt":8,"startToken":75737,"endToken":75795},{"p":204,"at":8,"title":"IV. Large Load Capacity and Load Ramp Schedule","method":"printed heading","endPage":204,"endAt":230,"startToken":75795,"endToken":75823},{"p":204,"at":230,"title":"V. Proposed Service Commencement Date and Term","method":"printed heading","endPage":204,"endAt":283,"startToken":75823,"endToken":75830},{"p":204,"at":283,"title":"VI. Source of Power","method":"printed heading","endPage":204,"endAt":309,"startToken":75830,"endToken":75834},{"p":204,"at":309,"title":"VII. Site Plan, Site Control, and Permits","method":"printed heading","endPage":205,"endAt":155,"startToken":75834,"endToken":76024},{"p":205,"at":155,"title":"VIII. Co-Located Generation","method":"printed heading","endPage":205,"endAt":501,"startToken":76024,"endToken":76069},{"p":205,"at":501,"title":"IX. Single-Line Diagram and Modeling Information","method":"printed heading","endPage":205,"endAt":1284,"startToken":76069,"endToken":76175},{"p":205,"at":1284,"title":"X. Required Submittals (LLIP Section 4.2.1)","method":"printed heading","endPage":205,"endAt":1736,"startToken":76175,"endToken":76248},{"p":205,"at":1736,"title":"XI. Acknowledgment","method":"printed heading","endPage":208,"endAt":46,"startToken":76248,"endToken":76354},{"p":208,"at":46,"title":"Table of Contents","method":"printed heading","endPage":255,"endAt":83,"startToken":76354,"endToken":94325},{"p":255,"at":83,"title":"Table of Contents","method":"printed heading","endPage":266,"endAt":4310,"startToken":94325,"endToken":99625},{"p":266,"at":4310,"title":"I. Col. J computes the total true-up as the sum of Col. G, H and I.","method":"printed heading","endPage":364,"endAt":6,"startToken":99625,"endToken":133149},{"p":364,"at":6,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":398,"endAt":664,"startToken":133149,"endToken":146825},{"p":398,"at":664,"title":"I. Large Load Interconnection Customer (ECLL) Contact Information","method":"printed heading","endPage":398,"endAt":827,"startToken":146825,"endToken":146845},{"p":398,"at":827,"title":"II. Large Load Customer Information","method":"printed heading","endPage":398,"endAt":1207,"startToken":146845,"endToken":146901},{"p":398,"at":1207,"title":"III. Point of Interconnection","method":"printed heading","endPage":399,"endAt":8,"startToken":146901,"endToken":146959},{"p":399,"at":8,"title":"IV. Large Load Capacity and Load Ramp Schedule","method":"printed heading","endPage":399,"endAt":230,"startToken":146959,"endToken":146987},{"p":399,"at":230,"title":"V. Proposed Service Commencement Date and Term","method":"printed heading","endPage":399,"endAt":283,"startToken":146987,"endToken":146994},{"p":399,"at":283,"title":"VI. Source of Power","method":"printed heading","endPage":399,"endAt":309,"startToken":146994,"endToken":146998},{"p":399,"at":309,"title":"VII. Site Plan, Site Control, and Permits","method":"printed heading","endPage":400,"endAt":155,"startToken":146998,"endToken":147188},{"p":400,"at":155,"title":"VIII. Co-Located Generation","method":"printed heading","endPage":400,"endAt":501,"startToken":147188,"endToken":147233},{"p":400,"at":501,"title":"IX. Single-Line Diagram and Modeling Information","method":"printed heading","endPage":400,"endAt":1284,"startToken":147233,"endToken":147339},{"p":400,"at":1284,"title":"X. Required Submittals (LLIP Section 4.2.1)","method":"printed heading","endPage":400,"endAt":1736,"startToken":147339,"endToken":147412},{"p":400,"at":1736,"title":"XI. Acknowledgment","method":"printed heading","endPage":404,"endAt":37,"startToken":147412,"endToken":147566},{"p":404,"at":37,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":406,"endAt":52,"startToken":147566,"endToken":147630},{"p":406,"at":52,"title":"I. INTRODUCTION AND EXPERIENCE","method":"printed heading","endPage":406,"endAt":138,"startToken":147630,"endToken":147643},{"p":406,"at":138,"title":"A. My name is Patrick Hayes. My business address is 16150 Main Circle Drive, Suite 310,","method":"printed heading","endPage":407,"endAt":631,"startToken":147643,"endToken":147917},{"p":407,"at":631,"title":"II. PURPOSE AND SCOPE OF TESTIMONY","method":"printed heading","endPage":407,"endAt":720,"startToken":147917,"endToken":147933},{"p":407,"at":720,"title":"A. The purpose of this testimony is to provide relevant context and details regarding","method":"printed heading","endPage":408,"endAt":98,"startToken":147933,"endToken":148105},{"p":408,"at":98,"title":"A. Yes. I am sponsoring the following exhibits:","method":"printed heading","endPage":408,"endAt":311,"startToken":148105,"endToken":148129},{"p":408,"at":311,"title":"III. FERC SHOW CAUSE ORDERS","method":"printed heading","endPage":408,"endAt":395,"startToken":148129,"endToken":148143},{"p":408,"at":395,"title":"A. On June 18, 2026, the FERC instituted show cause proceedings under section 206 of the","method":"printed heading","endPage":409,"endAt":995,"startToken":148143,"endToken":148493},{"p":409,"at":995,"title":"A. Yes, Commissioners Chang and See each issued separate concurrences providing","method":"printed heading","endPage":411,"endAt":423,"startToken":148493,"endToken":148993},{"p":411,"at":423,"title":"IV. CAISO STAKEHOLDER PROCESS","method":"printed heading","endPage":411,"endAt":554,"startToken":148993,"endToken":149014},{"p":411,"at":554,"title":"A. CAISO convened joint coordination meetings with the California Participating","method":"printed heading","endPage":412,"endAt":188,"startToken":149014,"endToken":149210},{"p":412,"at":188,"title":"A. DesertLink coordinated with CAISO and other California PTOs. DesertLink is a non-","method":"printed heading","endPage":413,"endAt":473,"startToken":149210,"endToken":149501},{"p":413,"at":473,"title":"A. DesertLink proposes a large-load interconnection framework under Section 10A and","method":"printed heading","endPage":413,"endAt":1005,"startToken":149501,"endToken":149572},{"p":413,"at":1005,"title":"V. COST RECOVERY AGREEMENT","method":"printed heading","endPage":413,"endAt":1073,"startToken":149572,"endToken":149583},{"p":413,"at":1073,"title":"A. The CRA is a pro forma contract between DesertLink, as Transmission Owner, and the","method":"printed heading","endPage":414,"endAt":634,"startToken":149583,"endToken":149801},{"p":414,"at":634,"title":"A. At a high level, the CRA responds directly to the three cost-recovery concerns identified","method":"printed heading","endPage":414,"endAt":1690,"startToken":149801,"endToken":149959},{"p":414,"at":1690,"title":"A. The core payment mechanism is the Supplemental Minimum Transmission Revenue","method":"printed heading","endPage":416,"endAt":992,"startToken":149959,"endToken":150450},{"p":416,"at":992,"title":"A. The Annual MTRC operates as a revenue floor, not an additive charge. Under Section","method":"printed heading","endPage":417,"endAt":838,"startToken":150450,"endToken":150735},{"p":417,"at":838,"title":"A. The CRA addresses stranded-asset risk through a twenty-year revenue commitment,","method":"printed heading","endPage":420,"endAt":90,"startToken":150735,"endToken":151470},{"p":420,"at":90,"title":"A. Section 7.1 recognizes Construction Security provided under an interconnection or","method":"printed heading","endPage":421,"endAt":121,"startToken":151470,"endToken":151738},{"p":421,"at":121,"title":"A. Section 6.8 establishes TRBAA Credits rather than Formula Rate revenue credits. In each","method":"printed heading","endPage":421,"endAt":1740,"startToken":151738,"endToken":151983},{"p":421,"at":1740,"title":"VI. TARIFF REVISIONS","method":"printed heading","endPage":422,"endAt":11,"startToken":151983,"endToken":151997},{"p":422,"at":11,"title":"A. The TO Tariff establishes the Eligible Customer for Large Load (\"ECLL\")","method":"printed heading","endPage":422,"endAt":1024,"startToken":151997,"endToken":152153},{"p":422,"at":1024,"title":"A. The principal changes establish definitions for Large Load, Co-Located Large Load,","method":"printed heading","endPage":423,"endAt":480,"startToken":152153,"endToken":152361},{"p":423,"at":480,"title":"A. The proposed framework establishes an ECLL interconnection process under Section","method":"printed heading","endPage":424,"endAt":291,"startToken":152361,"endToken":152642},{"p":424,"at":291,"title":"A. The proposed pro forma CRA is identified as Appendix V to the TO Tariff. TO Tariff","method":"printed heading","endPage":424,"endAt":1378,"startToken":152642,"endToken":152809},{"p":424,"at":1378,"title":"A. TO Tariff Section 10A.3.7 and LLIP Section 4.6.1.1 require consideration of alternative","method":"printed heading","endPage":426,"endAt":11,"startToken":152809,"endToken":153189},{"p":426,"at":11,"title":"A. Under Sections 6.1 and 12.3, the Formula Rate and Protocols continue to govern the","method":"printed heading","endPage":426,"endAt":1725,"startToken":153189,"endToken":153434},{"p":426,"at":1725,"title":"A. Section 6.6 carries an under-billed or over-billed Supplemental MTRC amount into","method":"printed heading","endPage":427,"endAt":1191,"startToken":153434,"endToken":153647},{"p":427,"at":1191,"title":"A. The Annual Projection workpapers and annual Reconciliation Statement make the","method":"printed heading","endPage":428,"endAt":1288,"startToken":153647,"endToken":153942},{"p":428,"at":1288,"title":"A. Yes, it does.","method":"printed heading","endPage":439,"endAt":234,"startToken":153942,"endToken":155170},{"p":439,"at":234,"title":"D. ERIC ARZOLA","method":"printed heading","endPage":440,"endAt":0,"startToken":155170,"endToken":155186},{"p":440,"at":0,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":442,"endAt":24,"startToken":155186,"endToken":155283},{"p":442,"at":24,"title":"D. ERIC ARZOLA","method":"printed heading","endPage":442,"endAt":44,"startToken":155283,"endToken":155286},{"p":442,"at":44,"title":"I. INTRODUCTION AND EXPERIENCE","method":"printed heading","endPage":442,"endAt":133,"startToken":155286,"endToken":155300},{"p":442,"at":133,"title":"A. My name is D. Eric Arzola. My business address is 16150 Main Circle Drive, Suite 310,","method":"printed heading","endPage":442,"endAt":772,"startToken":155300,"endToken":155407},{"p":442,"at":772,"title":"A. Yes. I have submitted testimony in Federal Energy Regulatory Commission (“FERC” or","method":"printed heading","endPage":443,"endAt":288,"startToken":155407,"endToken":155554},{"p":443,"at":288,"title":"II. PURPOSE AND SUMMARY OF TESTIMONY","method":"printed heading","endPage":443,"endAt":377,"startToken":155554,"endToken":155570},{"p":443,"at":377,"title":"A. The purpose of my testimony is to explain how DesertLink will recover the cost of","method":"printed heading","endPage":444,"endAt":44,"startToken":155570,"endToken":155786},{"p":444,"at":44,"title":"A. DesertLink proposes to credit the amounts it receives under its CRAs to transmission","method":"printed heading","endPage":444,"endAt":1412,"startToken":155786,"endToken":156002},{"p":444,"at":1412,"title":"A. No. The cost of service inputs, return, depreciation, taxes, and allocators are unchanged.","method":"printed heading","endPage":445,"endAt":378,"startToken":156002,"endToken":156120},{"p":445,"at":378,"title":"A. Yes. I am sponsoring the following exhibits:","method":"printed heading","endPage":445,"endAt":678,"startToken":156120,"endToken":156158},{"p":445,"at":678,"title":"III. DESERTLINK AND FORMULA RATE BACKGROUND","method":"printed heading","endPage":445,"endAt":803,"startToken":156158,"endToken":156178},{"p":445,"at":803,"title":"A. DesertLink is a transmission-only Participating Transmission Owner in the CAISO that","method":"printed heading","endPage":445,"endAt":1518,"startToken":156178,"endToken":156286},{"p":445,"at":1518,"title":"A. By October 1, DesertLink posts an Annual Projection of its net revenue requirement for","method":"printed heading","endPage":446,"endAt":316,"startToken":156286,"endToken":156367},{"p":446,"at":316,"title":"A. As provided in Appendix I of the TO Tariff, DesertLink’s Transmission Revenue","method":"printed heading","endPage":446,"endAt":1321,"startToken":156367,"endToken":156526},{"p":446,"at":1321,"title":"A. In the Show Cause Order, the Commission directed the CAISO and its transmission","method":"printed heading","endPage":447,"endAt":94,"startToken":156526,"endToken":156640},{"p":447,"at":94,"title":"IV. THE LARGE LOAD COST RECOVERY FRAMEWORK","method":"printed heading","endPage":447,"endAt":1128,"startToken":156640,"endToken":156819},{"p":447,"at":1128,"title":"A. Each Covered Upgrade placed under the CAISO’s Operational Control is included in","method":"printed heading","endPage":448,"endAt":150,"startToken":156819,"endToken":156963},{"p":448,"at":150,"title":"A. The Supplemental MTRC is calculated separately for each Covered Upgrade as the","method":"printed heading","endPage":448,"endAt":684,"startToken":156963,"endToken":157052},{"p":448,"at":684,"title":"A. The Supplemental MTRC follows the same calendar as the Formula Rate. With each","method":"printed heading","endPage":449,"endAt":90,"startToken":157052,"endToken":157242},{"p":449,"at":90,"title":"A. If an Eligible Customer does not pay, DesertLink may draw on the Eligible Customer’s","method":"printed heading","endPage":450,"endAt":37,"startToken":157242,"endToken":157544},{"p":450,"at":37,"title":"A. The CRA uses the term “TRBAA Credits” for the Forecast TRBAA Credit and the","method":"printed heading","endPage":450,"endAt":1098,"startToken":157544,"endToken":157708},{"p":450,"at":1098,"title":"A. Covered Upgrades will be subject to DesertLink’s Commission-accepted Formula Rate","method":"printed heading","endPage":451,"endAt":563,"startToken":157708,"endToken":157913},{"p":451,"at":563,"title":"V. CREDITING CRA AMOUNTS TO CUSTOMERS THROUGH THE TRBAA","method":"printed heading","endPage":451,"endAt":687,"startToken":157913,"endToken":157933},{"p":451,"at":687,"title":"A. Through the TRBAA. Each October, DesertLink will include the Forecast TRBAA","method":"printed heading","endPage":452,"endAt":89,"startToken":157933,"endToken":158164},{"p":452,"at":89,"title":"A. There are several reasons. First, the TRBAA already exists to credit customers with","method":"printed heading","endPage":452,"endAt":1072,"startToken":158164,"endToken":158326},{"p":452,"at":1072,"title":"A. No. DesertLink’s annual TRBAA filing is made under Section 205 of the Federal Power","method":"printed heading","endPage":453,"endAt":87,"startToken":158326,"endToken":158484},{"p":453,"at":87,"title":"A. Section 5.5 of the TO Tariff currently provides for the TRBAA to flow Transmission","method":"printed heading","endPage":453,"endAt":1359,"startToken":158484,"endToken":158697},{"p":453,"at":1359,"title":"A. DesertLink will add the following lines to the TRBA and TRBAA calculation it files each","method":"printed heading","endPage":454,"endAt":967,"startToken":158697,"endToken":158939},{"p":454,"at":967,"title":"A. Interest applies when DesertLink holds funds that belong to transmission customers, or","method":"printed heading","endPage":455,"endAt":432,"startToken":158939,"endToken":159167},{"p":455,"at":432,"title":"A. Yes. In each annual TRBAA filing, DesertLink will provide the TRBA and TRBAA","method":"printed heading","endPage":455,"endAt":1034,"startToken":159167,"endToken":159271},{"p":455,"at":1034,"title":"A. No. Appendix I states that DesertLink’s TRR equals its Base TRR plus its TRBAA, and","method":"printed heading","endPage":455,"endAt":1357,"startToken":159271,"endToken":159332},{"p":455,"at":1357,"title":"VI. DESERTLINK’S PROPOSED FORMULA RATE TEMPLATE CHANGES","method":"printed heading","endPage":455,"endAt":1457,"startToken":159332,"endToken":159347},{"p":455,"at":1457,"title":"A. The existing Formula Rate Template calculates the revenue requirement of the Harry","method":"printed heading","endPage":456,"endAt":45,"startToken":159347,"endToken":159404},{"p":456,"at":45,"title":"A. Attachment 1a has five sections, each with a line for each project. Additional project lines","method":"printed heading","endPage":456,"endAt":1021,"startToken":159404,"endToken":159569},{"p":456,"at":1021,"title":"A. Each project line on Attachment 1 now draws its project name, gross plant including","method":"printed heading","endPage":456,"endAt":1592,"startToken":159569,"endToken":159661},{"p":456,"at":1592,"title":"A. DesertLink proposes a new Line 17a, “Less: Revenue Credits included in the TRBAA,”","method":"printed heading","endPage":457,"endAt":316,"startToken":159661,"endToken":159765},{"p":457,"at":316,"title":"A. Yes. Attachment 1a has been added to the Table of Contents. There are no other changes.","method":"printed heading","endPage":457,"endAt":493,"startToken":159765,"endToken":159796},{"p":457,"at":493,"title":"A. No. The Formula Rate Implementation Protocols already require DesertLink to support","method":"printed heading","endPage":457,"endAt":1049,"startToken":159796,"endToken":159886},{"p":457,"at":1049,"title":"VII. NATIVE AND ILLUSTRATIVE EXHIBITS","method":"printed heading","endPage":457,"endAt":1139,"startToken":159886,"endToken":159899},{"p":457,"at":1139,"title":"A. Exhibit No. DLK-203 is the revised Formula Rate Template in native Excel format with","method":"printed heading","endPage":457,"endAt":1489,"startToken":159899,"endToken":159956},{"p":457,"at":1489,"title":"A. Exhibit No. DLK-204 is the revised Formula Rate Template populated with hypothetical","method":"printed heading","endPage":459,"endAt":434,"startToken":159956,"endToken":160377},{"p":459,"at":434,"title":"A. Exhibit No. DLK-205 illustrates the TRBA and TRBAA calculation for two consecutive","method":"printed heading","endPage":460,"endAt":789,"startToken":160377,"endToken":160749},{"p":460,"at":789,"title":"VIII. CONCLUSION","method":"printed heading","endPage":460,"endAt":872,"startToken":160749,"endToken":160762},{"p":460,"at":872,"title":"A. The revisions implement the Commission’s direction that large load payments be credited","method":"printed heading","endPage":460,"endAt":1660,"startToken":160762,"endToken":160882},{"p":460,"at":1660,"title":"A. Yes.","method":"printed heading","endPage":461,"endAt":527,"startToken":160882,"endToken":160952},{"p":461,"at":527,"title":"D. Eric Arzola","method":"printed heading","endPage":463,"endAt":83,"startToken":160952,"endToken":160979},{"p":463,"at":83,"title":"Table of Contents","method":"printed heading","endPage":474,"endAt":4310,"startToken":160979,"endToken":166279},{"p":474,"at":4310,"title":"I. Col. J computes the total true-up as the sum of Col. G, H and I.","method":"printed heading","endPage":495,"endAt":83,"startToken":166279,"endToken":174278},{"p":495,"at":83,"title":"Table of Contents","method":"printed heading","endPage":506,"endAt":4310,"startToken":174278,"endToken":179578},{"p":506,"at":4310,"title":"I. Col. J computes the total true-up as the sum of Col. G, H and I.","method":"printed heading","endPage":529,"endAt":0,"startToken":179578,"endToken":187576},{"p":529,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":529,"endAt":543,"startToken":187576,"endToken":187664}]}
