{"document":{"slug":"rec-20261116-5348-2","title":"Appendix A - Trans Bay Revised Tariff CLEAN_2","issued":"2026-11-16","accession":"20261116-5348","docket":"ER27-535-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Trans Bay Cable LLC","kind":"attachment","file":"sources/filings/text/20261116-5348_002.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5348","tier":"record","parent":"rec-20261116-5348","sha256":"c6b3f9b7d4894b6a4324c5c472b0c3451b35fd70a4a03de597ff703681d5c703","pages":69,"tokens":25560,"emptyPages":[],"textThemes":["study","cost","credit","flex"]},"pages":[{"page":1,"startToken":0,"endToken":13,"text":"APPENDIX A \n \nClean Version of the Revised Sections of the \nTrans Bay Tariff"},{"page":2,"startToken":13,"endToken":55,"text":"Company: Trans Bay Cable LLC \nProgram: FERC FPA Electric Tariff \nTariff Title: Transmission Owner Tariff \nProposed Effective Date: 2/16/2027 \nTariff Record Description: Transmission Owner Tariff \nTariff Record Title: Trans Bay Cable LLC \nTariff Record Version: 33.0.0 \nOption: A"},{"page":3,"startToken":55,"endToken":62,"text":"Trans Bay Cable LLC \nTransmission Owner Tariff"},{"page":4,"startToken":62,"endToken":296,"text":"ii \nTABLE OF CONTENTS \nSection \n   Page \n1.\nPreamble.. ..................................................................................................................... 1 \n1.1. \nTransmission Access for Participating TOs.. ................................................... 1 \n1.2. \nTransmission Access for Wheeling Customers. .............................................. 1 \n1.3. \nTransmission Access for End-Users. E ............................................................ 1 \n2.\nEffective Date. .............................................................................................................. 1 \n2.1. \nTermination.. .................................................................................................... 1 \n3.\nTO Definitions.. ............................................................................................................ 1 \n3.1. \nAccess Charge.. ................................................................................................ 1 \n3.2. \nAGC.. ............................................................................................................... 1 \n3.3. \nAncillary Services.. .......................................................................................... 2 \n3.4. \nApplicable Reliability Criteria.. ....................................................................... 2 \n3.5. \nAvailable Transfer Capacity. ........................................................................... 2 \n3.6. \nBase Transmission Revenue Requirement. ...................................................... 2 \n3.7. \nBlack Start. ....................................................................................................... 2 \n3.8. \nBusiness Day.. .................................................................................................. 2 \n3.9. \nCompleted Application Date. ........................................................................... 2 \n3.10. \nCompleted Interconnection Application. ......................................................... 2 \n3.11. \nCongestion. ...................................................................................................... 2 \n3.12. \nCongestion Management.................................................................................. 3 \n3.13. \nConverted Rights.............................................................................................. 3 \n3.14. \nCPUC.. ............................................................................................................. 3 \n3.15. \nDemand. ........................................................................................................... 3 \n3.16. \nDirect Assignment Facilities. ........................................................................... 3 \n3.17. \nDispatch.. ......................................................................................................... 3 \n3.18. \nDistribution System.......................................................................................... 3 \n3.19. \nEligible Customer.. .......................................................................................... 3 \n3.20. \nEncumbrance. ................................................................................................... 3 \n3.21. \nEnd-Use Customer or End-User. ..................................................................... 4 \n3.22. \nEnergy. ............................................................................................................. 4 \n3.23. \nEntitlement.. ..................................................................................................... 4 \n3.24. \nExisting Contracts. ........................................................................................... 4 \n3.25. \nExisting Rights. ................................................................................................ 4 \n3.26. \nExpedited Interconnection Agreement. ............................................................ 4 \n3.27. \nFacilities Study Agreement.. ............................................................................ 4 \n3.28. \nFacility or Facilities Study. .............................................................................. 4 \n3.29. \nFERC.. .............................................................................................................. 4 \n3.30. \nFlexible Interim Load Interconnection (“FILI”) Service.. ............................... 4 \n3.31. \nFPA.. ................................................................................................................ 5 \n3.32. \nGenerating Unit.. .............................................................................................. 5 \n3.33. \nGeneration. ....................................................................................................... 5 \n3.34. \nGood Utility Practice.. ..................................................................................... 5 \n3.35. \nGross Load. ...................................................................................................... 5 \n3.36. \nHigh Voltage Access Charge. .......................................................................... 6"},{"page":5,"startToken":296,"endToken":563,"text":"iii \n3.37. \nHigh Voltage Transmission Facility.. .............................................................. 6 \n3.38. \nHigh Voltage Transmission Revenue Requirement.. ....................................... 6 \n3.39. \nHigh Voltage Utility-Specific Rate. ................................................................. 6 \n3.40. \nHigh Voltage Wheeling Access Charge.. ......................................................... 6 \n3.41. \nIndependent System Operator (“ISO”).. .......................................................... 6 \n3.42. \nInterconnection................................................................................................. 6 \n3.43. \nInterconnection Agreement. ............................................................................. 6 \n3.44. \nInterconnection Application.. ........................................................................... 6 \n3.45. \nInterconnection Facilities.. ............................................................................... 7 \n3.46. \nInterest.. ............................................................................................................ 7 \n3.47. \nISO ADR Procedures.. ..................................................................................... 7 \n3.48. \nISO Controlled Grid.. ....................................................................................... 7 \n3.49. \nISO Protocols. .................................................................................................. 7 \n3.50. \nISO Tariff.. ....................................................................................................... 7 \n3.51. \nLarge Load. ...................................................................................................... 7 \n3.52. \nLoad. ................................................................................................................ 7 \n3.53. \nLocal Publicly Owned Electric Utility.. ........................................................... 7 \n3.54. \nLocal Regulatory Authority.. ........................................................................... 8 \n3.55. \nLocal Reliability Criteria. ................................................................................ 8 \n3.56. \nLow Voltage Access Charge. ........................................................................... 8 \n3.57. \nLow Voltage Transmission Revenue Requirement.. ....................................... 8 \n3.58. \nLow Voltage Wheeling Access Charge.. ......................................................... 8 \n3.59. \nMarket Participant.. .......................................................................................... 8 \n3.60. \nMetered Subsystem (“MSS”). .......................................................................... 8 \n3.61. \nNERC.. ............................................................................................................. 8 \n3.62. \nNetwork Upgrades.. ......................................................................................... 8 \n3.63. \nNew High Voltage Transmission Facility.. ...................................................... 8 \n3.64. \nNew Participating TO. ..................................................................................... 9 \n3.65. \nNon-Load-Serving Participating TO. ............................................................... 9 \n3.66. \nNon-Participating TO. ...................................................................................... 9 \n3.67. \nNon-Spinning Reserve. .................................................................................... 9 \n3.68. \nOperational Control.......................................................................................... 9 \n3.69. \nOriginal Participating TO. ................................................................................ 9 \n3.70. \nParticipating TO (“PTO”).. .............................................................................. 9 \n3.71. \nParticipation Agreement.. ................................................................................ 9 \n3.72. \nPhysical Scheduling Plant. ............................................................................... 9 \n3.73. \nPoint of Interconnection.. ............................................................................... 10 \n3.74. \nProject.. .......................................................................................................... 10 \n3.75. \nProject Proponent.. ......................................................................................... 10 \n3.76. \nProject Sponsor.. ............................................................................................ 10 \n3.77. \nRegional Transmission Group (“RTG”).. ...................................................... 10 \n3.78. \nRegulation. ..................................................................................................... 10 \n3.79. \nRegulatory Authority. .................................................................................... 11 \n3.80. \nReliability Criteria.......................................................................................... 11 \n3.81. \nReliability Upgrade. ....................................................................................... 11 \n3.82. \nRequest for Expedited Interconnection Procedures.. ..................................... 11"},{"page":6,"startToken":563,"endToken":846,"text":"iv \n3.83. \nScheduling Coordinator. ................................................................................ 11 \n3.84. \nScheduling Point.. .......................................................................................... 11 \n3.85. \nSite Control. ................................................................................................... 11 \n3.86. \nSpinning Reserve. .......................................................................................... 12 \n3.87. \nSystem Impact Study. .................................................................................... 12 \n3.88. \nSystem Impact Study Agreement. .................................................................. 12 \n3.89. \nTO Tariff.. ...................................................................................................... 12 \n3.90. \nTrans Bay Cable (“TBC”). ............................................................................. 12 \n3.91. \nTransition Charge.. ......................................................................................... 12 \n3.92. \nTransmission Control Agreement (“TCA”).. ................................................. 12 \n3.93. \nTransmission Owner (“TO”). ......................................................................... 12 \n3.94. \nTransmission Revenue Balancing Account Adjustment (“TRBAA”).. ......... 12 \n3.95. \nTransmission Revenue Credit.. ...................................................................... 12 \n3.96. \nTransmission Revenue Requirement (“TRR”).. ............................................ 13 \n3.97. \nTransmission System Rights (“TSRs”).. ........................................................ 13 \n3.98. \nUncontrollable Force...................................................................................... 13 \n3.99. \nUtility Distribution Company (“UDC”). ........................................................ 13 \n3.100. Voltage Support. ............................................................................................ 13 \n3.101. Western Electricity Coordinating Council (“WECC”). ................................. 13 \n3.102. Wheeling Access Charge.. ............................................................................. 13 \n3.103. Wheeling Out. ................................................................................................ 14 \n3.104. Wheeling Through. ........................................................................................ 14 \n3.105. Wheeling.. ...................................................................................................... 14 \n3.106. Wholesale Customer. ..................................................................................... 14 \n4.\nEligibility.. .................................................................................................................. 14 \n5.\nAccess Charges and Transmission Rates. .................................................................. 14 \n5.1. \nLow Voltage Access Charge.. ........................................................................ 14 \n5.2. \nWheeling Access Charge.. ............................................................................. 14 \n5.3. \nTransmission Revenue Requirement. . .......................................................... 15 \n5.4. \nTransmission System Rights.. ........................................................................ 15 \n5.5. \nTransmission Revenue Balancing Account Adjustment.. .............................. 15 \n6.\nAncillary Services – Applicability and Charges.. ...................................................... 16 \n7.\nBilling and Payment. .................................................................................................. 16 \n8.\nObligation to Interconnect or Construct Transmission Expansions and Facility\nUpgrades ..................................................................................................................... 16 \n8.1. \nParticipating TO Obligation to Interconnect.. ................................................ 16 \n8.2. \nParticipating TO Obligation to Construct Transmission Expansions or \nFacility Upgrades.. ......................................................................................... 19 \n8.3. \nRequest for FERC Deference Regarding Need Determination.. ................... 19 \n9.\nParticipating TO Process for Construction or Expansion of Transmission\nFacilities ..................................................................................................................... 19 \n9.1. \nDetermination of Facilities.. ........................................................................... 19 \n9.2. \nObligation to Build......................................................................................... 21 \n9.3. \nProvisions Relating to Transmission Construction on the Systems of \nOther TOs. ...................................................................................................... 23 \n10.\nInterconnection Process .............................................................................................. 23"},{"page":7,"startToken":846,"endToken":1137,"text":"v \n10.1. \nApplicability................................................................................................... 23 \n10.2. \nVoluntary Offer of Unbundled Retail Transmission Service......................... 23 \n10.3. \nRole of Participating TO; Coordination.. ....................................................... 24 \n10.4. \nApplications.. ................................................................................................. 24 \n10.5. \nInterconnection Application.. ......................................................................... 24 \n10.6. \nCompleted Interconnection Application.. ...................................................... 25 \n10.7. \nReview of Completed Interconnection Application....................................... 26 \n10.8. \nNotice of Need for System Impact Study. ..................................................... 26 \n10.9. \nSystem Impact Study Agreement.. ................................................................. 26 \n10.10. Execution of System Impact Study Agreement.. ........................................... 27 \n10.11. System Impact Study Cost Reimbursement and Agreement. ........................ 27 \n10.12. System Impact Study Procedures. .................................................................. 28 \n10.13. Procedures Upon Completion of System Impact Study................................. 29 \n10.14. Notice of Need for Facilities Study.. .............................................................. 30 \n10.15. Execution of Facilities Study Agreement.. .................................................... 30 \n10.16. Facilities Study Procedures.. .......................................................................... 30 \n10.17. Interconnection Agreement.. .......................................................................... 31 \n10.18. Large Load Partial Interim Service and FILI Service Requests.. .................. 32 \n10.19. Expedited Interconnection Procedures.. ......................................................... 34 \n10.20. Transition for Large Loads.. .......................................................................... 35 \n11.\nUncontrollable Forces and Indemnification ............................................................... 35 \n11.1. \nProcedures to Follow If Uncontrollable Force Occurs. ................................. 35 \n11.2. \nIndemnification.. ............................................................................................ 35 \n12.\nRegulatory Filings.. .................................................................................................... 36 \n12.1. \nOpen Access.. ................................................................................................. 36 \n13.\nCreditworthiness and Financial Security. ................................................................... 36 \n13.1. \nUDCs, MSSs, and Scheduling Coordinators Using the Participating \nTO’s Low Voltage Transmission Facilities.. ................................................. 36 \n13.2. \nEnd-Users.. ..................................................................................................... 36 \n14.\nDisputes.. .................................................................................................................... 37 \n15.\n[Reserved] .................................................................................................................. 37 \n16.\nMiscellaneous. ............................................................................................................ 37 \n16.1. \nNotices.. ......................................................................................................... 37 \n16.2. \nWaiver.. .......................................................................................................... 37 \n16.3. \nConfidentiality. .............................................................................................. 37 \n16.4. \nTO Tariff Supersedes Existing Tariffs.. ......................................................... 38 \n16.5. \nTitles. T. ......................................................................................................... 38 \n16.6. \nSeverability.. .................................................................................................. 38 \n16.7. \nPreservation of Obligations.. .......................................................................... 38 \n16.8. \nGoverning Law. ............................................................................................. 39 \n16.9. \nAppendices Incorporated.. ............................................................................. 39 \n16.10. Conflict With ISO Tariff.. .............................................................................. 39 \n16.11. Conflicting Operating Instructions................................................................. 39 \n16.12. Reliability Events.. ......................................................................................... 39 \nAPPENDIX I - Transmission Revenue Requirement and TRBAA ........................................ 40 \nAPPENDIX II - Notices.......................................................................................................... 41"},{"page":8,"startToken":1137,"endToken":1143,"text":"vi \nAttachment A - Cost Recovery Agreement"},{"page":9,"startToken":1143,"endToken":1618,"text":"1 \n1. \nPreamble. The Participating TO’s revenue requirements and applicable rates and charges \nfor transmission access over the ISO Controlled Grid and the terms and conditions for \ntransmission expansion and interconnection are set forth in this TO Tariff and the ISO \nTariff. For purposes of this TO Tariff and the ISO Tariff, TBC is a Non-Load-Serving \nParticipating TO and does not provide retail electric service to End-Use Customers. \n1.1. \nTransmission Access for Participating TOs. Participating TOs are able to \nparticipate in the ISO and utilize the entire ISO Controlled Grid to serve their \nEnd-Use Customers. The applicable High Voltage Access Charges and Transition \nCharges shall be paid by Participating TOs to the ISO pursuant to the ISO Tariff. \nIf a Participating TO utilizes the Low Voltage Transmission Facilities of another \nParticipating TO, the Participating TO shall also pay the Low Voltage Access \nCharge of the other Participating TO. \n1.2. \nTransmission Access for Wheeling Customers. Wheeling allows Scheduling \nCoordinators to deliver Energy through or out of the ISO Controlled Grid to serve \na load located outside the transmission or Distribution System of a Participating \nTO. Wheeling Access Charges shall be paid by Scheduling Coordinators to the \nISO pursuant to the ISO Tariff. \n1.3. \nTransmission Access for End-Users. End-Users receive transmission service \nover the ISO Controlled Grid through the Scheduling Coordinator designated by \nthe End-User. Charges to UDCs, MSSs, and, in certain cases, Scheduling \nCoordinators on behalf of End-Users for access to the ISO Controlled Grid shall \nbe paid to the applicable Participating TO to whose transmission or distribution \nfacilities the End-User is directly connected consistent with the distribution of the \nAccess Charge in Section 26.13 of the ISO Tariff. \n2. \nEffective Date. This TO Tariff is effective on the date on which the Project is placed into \nservice under the Operational Control of the ISO and shall continue to be effective, as \namended from time to time, so long as TBC is a party to the Transmission Control \nAgreement. \n2.1. \nTermination. This TO Tariff may be terminated by TBC upon such advance \nnotice and with such authorization as FERC may require. \n3. \nTO Definitions. Capitalized terms used in this TO Tariff shall have the meanings set out \nbelow unless otherwise stated or the context otherwise requires. Capitalized terms used in \nthis TO Tariff and not defined below shall have the meanings set out in the ISO Tariff as \nit may be amended from time to time. \n3.1. \nAccess Charge. A charge paid by all UDCs, MSSs, and, in certain cases, \nScheduling Coordinators delivering Energy to Gross Load, as set forth in Section \n26.1 of the ISO Tariff. The Access Charge includes the High Voltage Access \nCharge, the Transition Charge, and the Low Voltage Access Charge, as \napplicable. \n3.2. \nAGC. Generation equipment that automatically responds to signals from the"},{"page":10,"startToken":1618,"endToken":2003,"text":"2 \nISO’s EMS control in real time to control the power output of electric generators \nwithin a prescribed area in response to a change in system frequency, tieline \nloading, or the relation of these to each other, so as to maintain the target system \nfrequency and/or the established interchange with other areas within the \npredetermined limits. \n3.3. \nAncillary Services. Regulation, Spinning Reserve, Non-Spinning Reserve, \nVoltage Support and Black Start together with such other interconnected \noperation services as the ISO may develop in cooperation with Market \nParticipants to support the transmission of Energy from generation resources to \nLoads while maintaining reliable operation of the ISO Controlled Grid in \naccordance with WECC standards and Good Utility Practice. \n3.4. \nApplicable Reliability Criteria. The Reliability Standards and reliability criteria \nestablished by NERC and WECC, and Local Reliability Criteria, as amended \nfrom time to time, including any requirement of the Nuclear Regulatory \nCommission. \n3.5. \nAvailable Transfer Capacity. The available capacity of a given transmission \npath, in MW, after subtraction from that path’s Total Transfer Capability of \ncapacity associated with Existing Contracts and Transmission Ownership Rights \nand any Transmission Reliability Margin, as established consistent with ISO and \nWECC transmission capacity rating guidelines, as further described in Appendix \nL to the ISO Tariff. \n3.6. \nBase Transmission Revenue Requirement. The Transmission Revenue \nRequirement which does not reflect amounts for the TRBAA. \n3.7. \nBlack Start. The procedure by which a Generating Unit self-starts without an \nexternal source of electricity, thereby restoring power to the ISO Controlled Grid \nfollowing system or local area blackouts. \n3.8. \nBusiness Day. Monday through Friday, excluding federal holidays and the day \nafter Thanksgiving Day. \n3.9. \nCompleted Application Date. The date on which a party submits an \nInterconnection Application that satisfies the requirements of a Completed \nInterconnection Application. \n3.10. Completed Interconnection Application. An Interconnection Application that \nsatisfies all of the information and other requirements of Section 10.5 of this TO \nTariff and, if applicable, the information requirements as specified by the ISO and \nposted on the ISO Home Page. \n3.11. Congestion. A characteristic of the transmission system produced by a binding \nConstraint to the optimum economic dispatch to meet Demand such that the LMP, \nexclusive of Marginal Cost of Losses, at different Locations of the transmission \nsystem is not equal."},{"page":11,"startToken":2003,"endToken":2466,"text":"3 \n3.12. Congestion Management. The alleviation of Congestion in accordance with \napplicable ISO Protocols, the ISO Tariff, and Good Utility Practice. \n3.13. Converted Rights. Those transmission service rights determined in accordance \nwith Section 4.3.1.6 of the ISO Tariff. \n3.14. CPUC. The California Public Utilities Commission, or its successor. \n3.15. Demand. The rates at which Energy is delivered to Load and Scheduling Points \nby Generation, transmission or distribution facilities. It is the product of voltage \nand the in-phase component of alternating current measured in units of watts or \nstandard multiples therefore, e.g. 1000 W = 1 kW, 1000 kW = 1 MW, etc. \n3.16. Direct Assignment Facilities. Facilities or portions of facilities that are owned by \nthe Participating TO necessary to physically and electrically interconnect a \nparticular party requesting interconnection under this TO Tariff to the ISO \nControlled Grid at the point of interconnection. Direct Assignment Facilities shall \nbe specified in the Interconnection Agreement that governs Interconnection \nservice to such party and shall be subject to FERC approval. \n3.17. Dispatch. The operating control of an integrated electric system to: (i) assign \nspecific Generation Units and other sources of supply to effect the supply to meet \nthe relevant area Demand taken as Load rises or falls; (ii) control operations and \nmaintenance of high voltage lines, substations, and equipment, including \nadministration of safety procedures; (iii) operate Interconnections; (iv) manage \nEnergy transactions with other interconnected Balancing Authority Areas; and (v) \ncurtail Demand. \n3.18. Distribution System. The distribution assets of a TO, UDC, or MSS. \n3.19. Eligible Customer. (i) Any utility (including any Participating TO, Market \nParticipant or power marketer), Federal power marketing agency, or any person \ngenerating Energy for sale or resale; Energy sold or produced by such entity may \nbe Energy produced in the United States, Canada or Mexico; however, such entity \nis not eligible for transmission service that would be prohibited by FPA Section \n212(h)(2); and (ii) any retail customer taking unbundled transmission service \npursuant to a state retail access program or pursuant to a voluntary offer of \nunbundled retail transmissions service by the Participating TO. \n3.20. Encumbrance. A legal restriction or covenant binding on the Participating TO \nthat affects the operation of any transmission lines or associated facilities and \nwhich the ISO needs to take into account in exercising Operational Control over \nsuch transmission lines or associated facilities if the Participating TO is not to risk \nincurring significant liability. Encumbrances shall include Existing Contracts and \nmay include: (1) other local restrictions or covenants meeting the definition of \nEncumbrance and arising under other arrangements entered into before the ISO \nOperations Date, if any; and (2) legal restrictions or covenants meeting the \ndefinition of Encumbrance and arising under a contract or other arrangement"},{"page":12,"startToken":2466,"endToken":2847,"text":"4 \nentered into after the ISO Operations Date. \n3.21. End-Use Customer or End-User. A consumer of electric power that consumes \nsuch power to satisfy a Load directly connected to the ISO Controlled Grid or to a \nDistribution System and who does not resell the power. \n3.22. Energy. The electrical energy produced, flowing, or supplied by Generation, \ntransmission, or distribution facilities, being the integral with respect to time of \nthe instantaneous power, measured in units of watt-hours or standard multiples \nthereof. E.g. 1000 Wh = 1 kW, 1000 kWh = 1 MWh, etc. \n3.23. Entitlement. The right of a Participating TO obtained through contract or other \nmeans to use another entity’s transmission facilities for the transmission of \nEnergy. \n3.24. Existing Contracts. Those transmission service agreements or other contracts \nwhich grant transmission service rights in existence on the ISO Operations Date \n(including any contracts entered into pursuant to such contracts) as may be \namended in accordance with their terms or by agreement between the parties \nthereto from time to time. \n3.25. Existing Rights. Those transmission service rights defined in Section 16.1 of the \nISO Tariff. \n3.26. Expedited Interconnection Agreement. A contract between a party which has \nsubmitted a Request for Expedited Interconnection Procedures and the \nParticipating TO under which the Participating TO agrees to process, on an \nexpedited basis, the Completed Interconnection Application of such party and \nwhich sets forth the terms, conditions, and cost responsibilities for such \nInterconnection. \n3.27. Facilities Study Agreement. An agreement between a Participating TO and \neither a party requesting Interconnection to the ISO Controlled Grid, Market \nParticipants, Project Sponsor, Eligible Customer, or identified principal \nbeneficiaries pursuant to which the party requesting such Interconnection, Market \nParticipant, Project Sponsor, Eligible Customer, or identified principal \nbeneficiaries agrees to reimburse the Participating TO for the cost of performing \nor reviewing a Facilities Study. \n3.28. Facility or Facilities Study. An engineering study conducted to determine \nrequired modifications to the Participating TO’s transmission system, including \nthe estimated cost and scheduled completion date for such modifications, that will \nbe required to provide needed services. \n3.29. FERC. The Federal Energy Regulatory Commission, or its successor. \n3.30. Flexible Interim Load Interconnection (“FILI”) Service. Curtailable, interim \ninterconnection service for a Large Load provided by the ISO and Participating"},{"page":13,"startToken":2847,"endToken":3365,"text":"5 \nTO, enabling the Large Load to interconnect prior to the completion of the Large \nLoad’s Network Upgrades or Interconnection Facilities.  \n3.31. FPA. The Federal Power Act, 16 U.S.C.§ 791a et seq., as it may be amended \nfrom time to time. \n3.32. Generating Unit. An individual electric generator and its associated plant and \napparatus whose electrical output is capable of being separately identified and \nmetered or a Physical Scheduling Plant, that, in either case, is: (a) located within \nthe ISO Balancing Authority Area(which includes a Pseudo-Tie of a generating \nunit to the ISO Authority Area); (b) connected to the ISO Controlled Grid, either \ndirectly or via interconnected transmission or distribution facilities or via a \nPseudo-Tie; and (c) that is capable of producing and delivering net Energy \n(Energy in excess of a generation stations’ internal power requirements). \n3.33. Generation. Energy delivered from a Generating Unit. \n3.34. Good Utility Practice. Any of the practices, methods, and acts engaged in or \napproved by a significant portion of the electric utility industry during the relevant \ntime period, or any of the practices, methods, and acts which, in the exercise of \nreasonable judgment in light of the facts known at the time the decision was \nmade, could have been expected to accomplish the desired result at a reasonable \ncost consistent with good business practices, reliability, safety, and expedition. \nGood Utility Practice is not intended to be limited to any one of a number of the \noptimum practices, methods, or acts to the exclusion of all others, but rather to be \nacceptable practice, methods, or acts generally accepted in the region, including \nthose practices required by FPA section 215(a)(4).  \n3.35. Gross Load. For purposes of calculating the transmission Access Charge, Gross \nLoad is all Energy (adjusted for distribution losses) delivered for the supply of \nEnd-Use Customer Loads directly connected to the transmission facilities or \ndirectly connected to the Distribution System of a Utility Distribution Company \nor MSS Operator located in a PTO Service Territory. Gross Load includes Load \nserved by Excess Behind the Meter Production. Gross Load shall exclude (1) \nLoad with respect to which the Wheeling Access Charge is payable, (2) Load that \nis exempt from the Access Charge pursuant to Section 4.1, Appendix I of the ISO \nTariff, and the portion of the load of an individual retail customer of a Utility \nDistribution Company, Small Utility Distribution Company or MSS Operator that \nis served by a Generating Unit that: (a) is located on the customer’s site or \nprovides service to the customer’s site through over-the-fence arrangements as \nauthorized by Section 218 of the California Public Utilities Code; (b) is a \nqualifying small power production facility or qualifying cogeneration facility, as \nthose terms are defined in the FERC’s regulations implementing Section 201 of \nthe Public Utility Regulatory Policies Act of 1978; and (c) secures Standby \nService from the Participating TO under terms approved by a Local Regulatory \nAuthority or FERC, as applicable, or can be curtailed concurrently with an Outage \nof the Generating Unit serving the Load. Gross Load forecasts consistent with"},{"page":14,"startToken":3365,"endToken":3760,"text":"6 \nfiled Transmission Revenue Requirements will be provided by each Participating \nTO to the ISO. \n3.36. High Voltage Access Charge. A component of the Access Charge determined by \nthe ISO under Section 26.1 of the ISO Tariff. \n3.37. High Voltage Transmission Facility. A transmission facility under the \nOperational Control of the ISO that is owned by the Participating TO or to which \nthe Participating TO has an Entitlement that may be associated with a Converted \nRight, which operates at a voltage at or above 200 kilovolts, and supporting \nfacilities, and the costs of which are not directly assigned to one or more specific \ncustomers. \n3.38. High Voltage Transmission Revenue Requirement. The portion of the \nParticipating TO’s TRR associated with and allocable to the Participating TO’s \nHigh Voltage Transmission Facilities and Converted Rights associated with High \nVoltage Transmission Facilities. \n3.39. High Voltage Utility-Specific Rate. The Participating TO’s High Voltage \nTransmission Revenue Requirement divided by the Participating TO’s forecast of \nits Gross Load. \n3.40. High Voltage Wheeling Access Charge. The Wheeling Access Charge assessed \nby the ISO associated with the recovery of the Participating TO’s High Voltage \nTransmission Revenue Requirement in accordance with Section 26.1 of the ISO \nTariff. \n3.41. Independent System Operator (“ISO”). The California Independent System \nOperator Corporation, a state chartered, nonprofit corporation that controls the \ntransmission facilities of all Participating TOs and dispatches certain Generating \nUnits and Loads. \n3.42. Interconnection. Transmission facilities, other than additions or replacements to \nexisting facilities that: (i) connect one system to another system where the \nfacilities emerge from one and only one substation of the two systems and are \nfunctionally separate from the ISO Controlled Grid facilities such that the \nfacilities are, or can be, operated and planned as a single facility; (ii) are identified \nas radial transmission lines pursuant to contract; or (iii) produce Generation at a \nsingle point on the ISO Controlled Grid; provided that such interconnection does \nnot include facilities that, if not owned by the Participating TO, would result in a \nreduction in the ISO’s Operational Control of the Participating TO’s portion of \nthe ISO Controlled Grid. \n3.43. Interconnection Agreement. A contract between a party requesting \nInterconnection and the Participating TO that owns the transmission facility with \nwhich the requesting party wishes to interconnect. \n3.44. Interconnection Application. An application that requests Interconnection to the"},{"page":15,"startToken":3760,"endToken":4202,"text":"7 \nISO Controlled Grid. \n3.45. Interconnection Facilities. Collectively, Interconnection Facilities include all \nfacilities and equipment between the Generating Facility or Large Load and the \nPoint of Interconnection, including any modifications, additions, or upgrades that \nare necessary to physically and electrically interconnect to the transmission \nsystem. Interconnection Facilities are sole use facilities and do not include \nDistribution Upgrades, Stand Alone Network Upgrades, or Network Upgrades.  \n3.46. Interest. Interest shall be calculated in accordance with the methodology \nspecified for interest on refunds in the regulations of FERC at 18 C.F.R.§ \n35.19(a)(2)(iii). Interest on delinquent amounts shall be calculated from the due \ndate of the bill to the date of payment, except as provided in Section 11.29.13.1 of \nthe ISO Tariff. When payments are made by mail, bills shall be considered as \nhaving been paid on the date of receipt. \n3.47. ISO ADR Procedures. The procedures for resolution of disputes or differences \nset out in Section 13 of the ISO Tariff, as amended from time to time. \n3.48. ISO Controlled Grid. The system of transmission lines and associated facilities \nof the Participating TOs that have been placed under the ISO’s Operational \nControl. \n3.49. ISO Protocols. The rules, protocols, procedures and standards promulgated by \nthe ISO (as amended from time to time) to be complied with by the ISO \nScheduling Coordinators, Participating TOs and all other Market Participants in \nrelation to the operation of the ISO Controlled Grid and the participation in the \nmarkets for Energy and Ancillary Services in accordance with the ISO Tariff. \n3.50. ISO Tariff. The California Independent System Operator Agreement and Tariff, \ndated March 31, 1997, as it may be modified from time to time. \n3.51. Large Load. An End-User located at a single site behind one or more Points of \nInterconnection to the ISO Controlled Grid, and that has a peak load of 50 MW or \ngreater. \n3.52. Load. An end-use device of an End-Use Customer that consumes power. Load \nshould not be confused with Demand, which is the measure of power that a Load \nreceives or requires. \n3.53. Local Publicly Owned Electric Utility. A municipality or municipal corporation \noperating as a public utility furnishing electric service, a municipal district \nfurnishing electric services, a public utility district furnishing electric services, an \nirrigation district furnishing electric services, a state agency or subdivision \nfurnishing electric services, a rural cooperative furnishing electric services, or a \njoint powers authority that includes one or more of these agencies and that owns \nGeneration or transmission facilities, or furnishes electric services over its own or \nits members’ electric Distribution System."},{"page":16,"startToken":4202,"endToken":4625,"text":"8 \n3.54. Local Regulatory Authority. The state or local governmental authority \nresponsible for the regulation or oversight of a utility. \n3.55. Local Reliability Criteria. Reliability criteria established by the ISO, unique to \nthe transmission systems of each of the Participating TOs, as they may be updated \nfrom time to time. \n3.56. Low Voltage Access Charge. The Access Charge applicable under Section 26.1 \nof the ISO Tariff to recover the Low Voltage Transmission Revenue Requirement \nof the Participating TO. \n3.57. Low Voltage Transmission Revenue Requirement. The portion of the \nParticipating TO’s TRR associated with and allocable to the Participating TO’s \nLow Voltage Transmission Facilities and Converted Rights associated with Low \nVoltage Transmission Facilities. \n3.58. Low Voltage Wheeling Access Charge. The Wheeling Access Charge associated \nwith the recovery of the Participating TO’s Low Voltage Transmission Revenue \nRequirement in accordance with Section 26.1 of the ISO Tariff. \n3.59. Market Participant. An entity, including a Scheduling Coordinator, who \nparticipates in the Energy marketplace through the buying, selling, transmission, \nor distribution of Energy or Ancillary Services into, out of, or through the ISO \nControlled Grid. \n3.60. Metered Subsystem (“MSS”). A geographically contiguous system, located \nwithin a single zone which has been operating as an electric utility for a number \nof years prior to the ISO Operations Date as a municipal utility, water district, \nirrigation district, state agency or federal power marketing authority subsumed \nwithin the ISO Balancing Authority Area and encompassed by ISO certified \nrevenue quality meters at each interface point with the ISO Controlled Grid and \nISO-certified revenue quality meters on all Generating Units or, if aggregated, \neach individual resource, Participating Load, Reliability Demand Response \nResource, and Proxy Demand Response internal to the system, which is operated \nin accordance with a MSS agreement described in Section 4.9.1 of the ISO Tariff. \n3.61. NERC. The North American Electric Reliability Corporation or its successor. \n3.62. Network Upgrades. The additions, modifications, and upgrades to the ISO \nControlled Grid at or beyond the Point of Interconnection and Distribution \nSystem. Network Upgrades do not include Distribution Upgrades or \nInterconnection Facilities. \n3.63. New High Voltage Transmission Facility. A High Voltage Transmission \nFacility of the Participating TO that enters service on or after the Transition Date \ndescribed in Section 4 of Appendix F, Schedule 3 of the ISO Tariff, or a capital \naddition made on or after the Transition Date described in Section 4.1. of \nAppendix F, Schedule 3 of the ISO Tariff to a High Voltage Transmission Facility"},{"page":17,"startToken":4625,"endToken":5069,"text":"9 \nthat existed prior to the Transition Date. \n3.64. New Participating TO. A Participating TO that is not an Original Participating \nTO. \n3.65. Non-Load-Serving Participating TO. A Participating TO that (1) is not a UDC, \nMSS Operator or Scheduling Coordinator serving End-Use customers and (2) \ndoes not have Gross Load in accordance with ISO Tariff Section 9 of Schedule 3 \nof Appendix F.  \n3.66. Non-Participating TO. A TO that is not a party to the TCA or, for the purpose of \nSection 16.1 of the ISO Tariff, the holder of transmission service rights under an \nExisting Contract that is not a Participating TO. \n3.67. Non-Spinning Reserve. The portion of off-line generating capacity that is \ncapable of being synchronized and ramping to a specified load in ten minutes (or \nload that is capable of being interrupted in ten minutes) and that is capable of \nrunning (or being interrupted) for at least thirty (30) minutes. \n3.68. Operational Control. The rights of the ISO under the Transmission Control \nAgreement and the ISO Tariff to direct Participating TOs how to operate their \ntransmission lines and facilities and other electric plant affecting the reliability of \nthose lines and facilities for the purpose of affording comparable non-\ndiscriminatory transmission access and meeting Applicable Reliability Criteria. \n3.69. Original Participating TO. A Participating TO that was a Participating TO as of \nJanuary 1, 2000. The Original Participating TOs are Pacific Gas and Electric \nCompany, Southern California Edison Company, and San Diego Gas & Electric \nCompany. \n3.70. Participating TO (“PTO”). A party to the TCA whose application under Section \n2.2 of the TCA has been accepted and who has placed its transmission assets \nand/or Entitlements under the ISO’s Operational Control in accordance with the \nTCA. A PTO may be an Original Participating TO or a New Participating TO. For \nthe purposes of this Tariff, the Participating TO is TBC. \n3.71. Participation Agreement. An agreement between a Participating TO and a \nProject Sponsor that specifies the terms and conditions under which the \nParticipating TO will construct a transmission addition or upgrade on behalf of \nthe Project Sponsor. \n3.72. Physical Scheduling Plant. A group of two or more related Generating Units \neach of which is individually capable of producing Energy, but which either by \nphysical necessity or operational design must be operated as if they were a single \nGenerating Unit and any Generating Unit or Units containing related multiple \ngenerating components which meet one or more of the following criteria: (i) \nmultiple generating components are related by a common flow of fuel which \ncannot be interrupted without substantial loss of efficiency of the combined"},{"page":18,"startToken":5069,"endToken":5542,"text":"10 \noutput of all components; (ii) the Energy production from one component \nnecessarily causes Energy production from other components; (iii) the operational \narrangement of related multiple generating components determines the overall \nphysical efficiency of the combined output of all components; (iv) the level of \ncoordination required to schedule individual generating components would cause \nthe ISO to incur scheduling costs far in excess of the benefits of having scheduled \nsuch individual components separately; or (v) metered output is available only for \nthe combined output of related multiple generation components and separate \ngenerating component metering is either impractical or economically inefficient. \n3.73. Point of Interconnection. The point, as set forth in the applicable interconnection \nagreement, where the Interconnection Facilities connect to the ISO Controlled \nGrid. For Generating Facilities connected to the Distribution System, the Point of \nInterconnection is the point at which the Generating Facility connects to the ISO \nControlled Grid. For a Large Load, the Point of Interconnection is the point at \nwhich the Interconnection Facilities connect to the ISO Controlled Grid. \n3.74. Project. The approximately fifty-three mile, high voltage, direct current \ntransmission line and associated facilities to establish a dedicated connection \nbetween PG&E’s Pittsburg Substation located at a site within the City of \nPittsburg, California in Contra Costa County to PG&E’s Potrero Substation \nwithin the City of San Francisco. The transmission line will consist of an \napproximately 7,000 ton bundled cable consisting of a transmission cable, a fiber \noptic communications cable and a metallic return. \n3.75. Project Proponent. A Market Participant or group of Market Participants that (i) \nadvocates a transmission addition or upgrade; (ii) is unwilling to pay the full cost \nof the proposed transmission addition or upgrade, and thus is not a Project \nSponsor; and (iii) initiates proceedings under the ISO ADR Procedures to \ndetermine the need for the proposed transmission addition or upgrade. \n3.76. Project Sponsor. A Market Participant or group of Market Participants or a \nParticipating TO that proposes the construction of a transmission addition or \nupgrade in accordance with Section 24 of the ISO Tariff. \n3.77. Regional Transmission Group (“RTG”). A voluntary organization approved by \nFERC and composed of transmission owners, transmission users, and other \nentities, organized to efficiently coordinate the planning, expansion, and use of \ntransmission on a regional and inter-regional basis. \n3.78. Regulation. The service provided either by Generating Units certified by the ISO \nas equipped and capable of responding to the ISO’s direct digital control (AGC) \nsignals, or by System Resources that have been certified by the ISO as capable of \ndelivering such service to the ISO Balancing Authority Area, in an upward and \ndownward direction to match, on a Real Time basis, Demand and resources, \nconsistent with established NERC and WECC reliability standards, including any \nrequirements of the Nuclear Regulatory Commission. Regulation is used to"},{"page":19,"startToken":5542,"endToken":5985,"text":"11 \ncontrol the Power output of electric generators within a prescribed area in \nresponse to a change in system frequency, tieline loading, or the relation of these \nto each other so as to maintain the target system frequency and/or the established \ninterchange with other Balancing Authority Areas within the predetermined \nRegulation Limits. Regulation includes both the increase of output by a \nGenerating unit or System Resource (Regulation Up) and the decrease in output \nby a Generating unit or System Resource (Regulation Down). Regulation Up and \nRegulation Down are distinct capacity products, with separately stated \nrequirements and ASMPs in each Settlement Period. \n3.79. Regulatory Authority. In the case of TBC, the FERC. \n3.80. Reliability Criteria. Pre-established criteria that are to be followed in order to \nmaintain desired performance of the ISO Controlled Grid under contingency or \nsteady state conditions. \n3.81. Reliability Upgrade. The transmission facilities other than Direct Assignment \nFacilities beyond the first point of Interconnection necessary to interconnect a \nfacility, Large Load, or wholesale Load safely and reliably to the ISO Controlled \nGrid, which would not have been necessary but for the Interconnection of a \nfacility, Large Load, or wholesale Load, including network upgrades necessary to \nremedy short circuit or stability problems resulting from the Interconnection of \nthe facility, Large Load, or wholesale Load to the ISO Controlled Grid. \nReliability Upgrades also include, consistent with WECC practice, the facilities \nnecessary to mitigate any adverse impact a facility’s, Large Load’s, or wholesale \nLoad’s Interconnection may have on a path’s WECC path rating. Reliability \nUpgrades shall be specified in the Interconnection Agreement that governs \nInterconnection service and shall be subject to FERC approval. \n3.82. Request for Expedited Interconnection Procedures. A written request by \nwhich an applicant for Interconnection can request expedited processing of its \ninterconnection Application. \n3.83. Scheduling Coordinator. An entity certified by the ISO for the purpose of \nundertaking the functions specified in Section 4.5 of the ISO Tariff. \n3.84. Scheduling Point. A location at which the ISO Controlled Grid or a transmission \nfacility owned by a Transmission Ownership Right holder is connected, by a \ngroup of transmission paths for which a physical, non-simultaneous transmission \ncapacity rating has been established for Congestion Management, to transmission \nfacilities that are outside the ISO’s Operational Control. \n3.85. Site Control. The exclusive land right to develop, construct, operate, and \nmaintain the Generating Facility or Large Load over the term of the expected \noperation of the Generating Facility or Large Load. Site Control may be \ndemonstrated by documentation establishing: (1) ownership of, a leasehold \ninterest in, or a right to develop a site of sufficient size to construct and operate"},{"page":20,"startToken":5985,"endToken":6394,"text":"12 \nthe Generating Facility or Large Load; (2) an option to purchase or acquire a \nleasehold site of sufficient size to construct and operate the Generating Facility or \nLarge Load; or (3) any other documentation that clearly demonstrates the right to \nexclusively occupy a site of sufficient size to construct and operate the Generating \nFacility or Large Load. \n3.86. Spinning Reserve. The portion of unloaded synchronized generating capacity, \nthat is immediately responsive to system frequency and that is capable of being \nloaded in ten minutes, and that is capable of running for at least thirty (30) \nminutes. \n3.87. System Impact Study. An engineering study conducted to determine whether a \nrequest for Interconnection to the ISO Controlled Grid would require new \ntransmission additions, upgrades, or other mitigation measures. \n3.88. System Impact Study Agreement. An agreement between a Participating TO \nand an entity that has requested Interconnection to the Participating TO’s \ntransmission system pursuant to which the entity requesting Interconnection \nagrees to reimburse the Participating TO for the cost of performing or reviewing a \nSystem Impact Study. \n3.89. TO Tariff. This Transmission Owner Tariff, as it may be amended or superseded. \n3.90. Trans Bay Cable (“TBC”). The Delaware limited liability company that is the \nParticipating TO under this TO Tariff. \n3.91. Transition Charge. A component of the Access Charge determined by the ISO \nand assessed by the Participating TO along with the High Voltage Access Charge \nin accordance with Section 5.7 of Appendix F, Schedule 3 of the ISO Tariff. \n3.92. Transmission Control Agreement (“TCA”). The agreement between the ISO \nand Participating TOs establishing the terms and conditions under which TOs will \nbecome Participating TOs and how the ISO and each Participating TO will \ndischarge its respective duties and responsibilities, as may be modified from time \nto time. \n3.93. Transmission Owner (“TO”). An entity owning transmission facilities or having \nfirm contractual rights to use transmission facilities. \n3.94. Transmission Revenue Balancing Account Adjustment (“TRBAA”). A \nmechanism established by the Participating TO which will ensure that all \nTransmission Revenue Credits and other credits specified in Sections 6 and 8 of \nAppendix F, Schedule 3 of the ISO Tariff, flow through to ISO Tariff and TO \nTariff transmission customers. \n3.95. Transmission Revenue Credit. The proceeds received from the ISO (other than \nfor the recovery of the Participating TO’s High Voltage and Low Voltage \nTransmission Revenue Requirement through the High Voltage and Low Voltage"},{"page":21,"startToken":6394,"endToken":6844,"text":"13 \nTransmission Access Charges) and charges imposed by the ISO that are received \nand paid by the Participating TO in its role as Participating TO, as defined in the \nISO Tariff. \n3.96. Transmission Revenue Requirement (“TRR”). The total annual authorized \nrevenue requirement associated with (1) transmission facilities and Entitlements \nturned over to the Operational Control of the ISO by the Participating TO or (2) \ntransmission facilities that are not yet in operation, but have been approved under \nSection 24 and assigned to an Approved Project Sponsor. The costs of any \ntransmission facility turned over to the Operational Control of the ISO shall be \nfully included in the Participating TO’s TRR. The TRR includes the costs of \ntransmission facilities and Entitlements and deducts Transmission Revenue \nCredits, credits for Standby Transmission Revenue and Cost Recovery Agreement \npayments, and is shown in Appendix I. \n3.97. Transmission System Rights (“TSRs”). TSRs represent Trans Bay Cable’s \nexclusive transmission entitlement on the Project. Trans Bay Cable, as the holders \nof the TSRs, is entitled to all associated rights as are available under the ISO \nTariff and Protocols. The use of this definition does not limit Trans Bay Cable \nfrom seeking any additional revenues or rights that are authorized by FERC due \nto a beneficial increase in the ISO controlled grid capacity resulting from this \nProject. \n3.98. Uncontrollable Force. Any act of God, labor disturbance, act of the public \nenemy, war, insurrection, riot, fire, storm, flood, earthquake, explosion, any \ncurtailment, order, regulation or restriction imposed by governmental, military or \nlawfully established civilian authorities or any other cause beyond the reasonable \ncontrol of the ISO or Market Participant, as the case may be, which could not be \navoided through the exercise of Good Utility Practice. \n3.99. Utility Distribution Company (“UDC”). An entity that owns a Distribution \nSystem for the delivery of Energy to and from the ISO Controlled Grid, and/or \nthat provides regulated retail electric service to End-Users, as well as regulated \nprocurement service to those End-Users who are not yet eligible for direct access, \nor who choose not to arrange service through another retailer. \n3.100. Voltage Support. Services provided by Generating Units or other equipment \nsuch as shunt capacitors, static var compensators, or synchronous condensers that \nare required to maintain established grid voltage criteria. This service is required \nunder normal or system emergency conditions. \n3.101. Western Electricity Coordinating Council (“WECC”). The Western Electricity \nCoordinating Council or its successor. \n3.102. Wheeling Access Charge. The charge assessed by the ISO that is paid by a \nScheduling Coordinator for Wheeling in accordance with Section 26.1.4.1 of the \nISO Tariff. Wheeling Access Charges shall not apply for Wheeling under a"},{"page":22,"startToken":6844,"endToken":7274,"text":"14 \nbundled non-economy Energy coordination agreement of a Participating TO \nexecuted prior to July 9, 1996. The Wheeling Access Charge consists of a High \nVoltage Wheeling Access Charge and, if applicable, a Low Voltage Wheeling \nAccess Charge. \n3.103. Wheeling Out. Except for Existing Rights exercised under an Existing Contract \nin accordance with Section 16.1 of the ISO Tariff, the use of the ISO Controlled \nGrid for the transmission of Energy from a Generating Unit located within the \nISO Controlled Grid to serve a Load located outside the transmission and \nDistribution System of a Participating TO. \n3.104. Wheeling Through. Except for Existing Rights exercised under an Existing \nContract in accordance with Section 16.1 of the ISO Tariff, the use of the ISO \nControlled Grid for the transmission of Energy from a resource located outside \nthe ISO Controlled Grid to serve a Load located outside the transmission and \nDistribution System of a Participating TO. \n3.105. Wheeling. Wheeling Out or Wheeling Through. \n3.106. Wholesale Customer. A person wishing to purchase Energy and Ancillary \nServices at a Bulk Supply Point or a Scheduling Point for resale. \n4. \nEligibility. Transmission service over a Participating TO’s system shall be provided only \nto Eligible Customers. \n4.1. \nIntentionally Left Blank. Not used. \n5. \nAccess Charges and Transmission Rates. The applicable Access Charges are provided \nin the ISO Tariff. \n5.1. \nLow Voltage Access Charge. The Low Voltage Access Charge shall be \ndetermined in accordance with the ISO Tariff. As TBC is a Non-Load-Serving \nParticipating TO, the ISO shall charge for and collect the Low Voltage Access \nCharge on TBC’s behalf pursuant to Section 26.1 and Appendix F, Schedule 3, \nSection 13 of the ISO Tariff from the Participating TO to whose facilities TBC’s \nLow Voltage Transmission Facilities are directly connected. The rate for TBC’s \nLow Voltage Access Charge shall be TBC’s Low Voltage Transmission Revenue \nRequirement divided by the forecasted Gross Load of the Participating TO that is \nthe Low Voltage Access Charge customer. The Low Voltage Access Charge \ncustomer shall pay the ISO a Low Voltage Access Charge equal to the product of \nthe TBC’s Low Voltage Access Charge rate and the actual Gross Load of the \nParticipating TO that is the Low Voltage Access Charge customer. Gross Load \nassociated with a Large Load is attributed to the Large Load’s load-serving entity \nor Scheduling Coordinator under the ISO Tariff and service under Section 10 \ndoesn’t make TBC a UDC, MSS, or Scheduling Coordinator serving End-Use \nCustomers. \n5.2. \nWheeling Access Charge. The Wheeling Access Charge shall be determined in"},{"page":23,"startToken":7274,"endToken":7682,"text":"15 \naccordance with the ISO Tariff. The Wheeling Access Charge assessed by the \nISO consists of a High Voltage Wheeling Access Charge and, if applicable, a \nLow Voltage Wheeling Access Charge. The High Voltage Wheeling Access \nCharge is set forth in the ISO Tariff. \n5.3. \nTransmission Revenue Requirement. As set forth in the ISO Tariff, the \nTransmission Revenue Requirement for each Participating TO is used to develop \nthe Access Charges set forth in the ISO Tariff and is used by the ISO to calculate \nthe disbursement of Wheeling revenues among Participating TOs. Wheeling \nrevenues are disbursed by the ISO to Participating TOs pursuant to Section \n26.1.4.3 of the ISO Tariff. The Transmission Revenue Requirement, High \nVoltage Transmission Revenue Requirement, and Low Voltage Transmission \nRevenue Requirement for the Participating TO are set forth in Appendix I. \n5.4. \nTransmission System Rights. TBC owns the TSRs with respect to the Project. \n5.5. \nTransmission Revenue Balancing Account Adjustment. The Participating TO \nshall maintain a Transmission Revenue Balancing Account with an annual \nTransmission Revenue Balancing Account Adjustment (“TRBAA”) that will \nensure that all Transmission Revenue Credits and adjustments for any over- or \nunder-recovery of its annual Transmission Revenue Requirement, if any, \nspecified in Sections 6, 8 and 13 of Appendix F, Schedule 3 of the ISO Tariff, \nflow through to transmission customers. The TRBAA used to calculate the High \nVoltage Revenue Requirement shall include other adjustments specified in \nAppendix F, Schedule 3, Sections 6, 8, and 13 of the ISO Tariff. \nThe TRBAA shall be equal to: \nTRBAA = Cr + Cf + I \nWhere: \nCr = The principal balance in the Transmission Revenue Balancing Account \n(“TRBA”) recorded in FERC Account No. 254 as of September 30 of the year \nprior to commencement of the January billing cycle. This balance represents \nthe unamortized balance in the TRBA from the previous period and the \ndifference in the amount of revenues or expenditures from Transmission \nRevenue Credits and any over- or under-recovery of its annual Transmission \nRevenue Requirement and the amount of such revenues or expenditures that \nhas been refunded to or collected from customers through operation of the \nTRBAA; \nCf = The forecast of Transmission Revenue Credits, if any, for the following \ncalendar year; \nI = The interest balance for the TRBA, which shall be calculated using the \ninterest rate pursuant to Section 35.19(a) of FERC’s regulations under the \nFederal Power Act (18 CFR Section 35.19(a)). Interest shall be calculated"},{"page":24,"startToken":7682,"endToken":8071,"text":"16 \nbased on the average TRBA principal balance each month, compounded \nquarterly; and \nThe TBC TRBAA, calculated in accordance with the ISO Tariff and \napproved by the FERC, is stated in Appendix I. \n6. \nAncillary Services – Applicability and Charges. Ancillary Services are needed to \nmaintain reliability within the ISO Controlled Grid. If any Ancillary Services are \nrequired, TBC will not provide such services directly to the transmission customer and \nthe transmission customer will be required to meet any such requirement in accordance \nwith the ISO Tariff. \n7. \nBilling and Payment. \n7.1. \nThe ISO, in accordance with the ISO Tariff, shall pay the Participating TO, \namong other things, all applicable Access Charge revenues and Wheeling \nrevenues in connection with the Project. \n7.2. \nUsers of TBC’s High and Low Voltage Transmission Facilities and Entitlements \nplaced under the ISO’s Operational Control shall pay to the ISO all applicable \ncharges in accordance with the ISO Tariff. \n8. \nObligation to Interconnect or Construct Transmission Expansions and Facility \nUpgrades \n8.1. \nParticipating TO Obligation to Interconnect. The Participating TO shall, at the \nrequest of a third party, interconnect its system to the wholesale generation, Load, \nor Large Load owned by or served by such third party, or modify an existing \nInterconnection. Interconnections under this TO Tariff shall be available to \nentities eligible to request Interconnection consistent with the provisions of \nSection 210(a) of the FPA and to Eligible Customers. The procedures for \nInterconnection of wholesale generation to the ISO Controlled Grid shall be \ngoverned by the ISO Tariff. \n8.1.1. Interconnection to Transmission System. Interconnection must be \nconsistent with Good Utility Practice, in conformance with all Applicable \nReliability Criteria, all applicable statutes, regulations, and ISO reliability \ncriteria for the ISO Controlled Grid. The Participating TO will not \naccommodate the Interconnection if doing so would impair systems \nreliability, or would otherwise impair the ability of the Participating TO to \nhonor its Encumbrances existing as of the time an entity submits its \nInterconnection Application. The Participating TO shall identify any such \nadverse effect on its Encumbrances in the System Impact Study performed \npursuant to Section 10.12. To the extent the Participating TO determines \nthat the Interconnection will have an adverse effect on Encumbrances, the \nparty requesting Interconnection shall mitigate such adverse effect. \n8.1.2. Costs Associated with Interconnection. Each party requesting"},{"page":25,"startToken":8071,"endToken":8489,"text":"17 \nInterconnection shall pay the costs of planning, installing, owning, \noperating, and maintaining any Direct Assignment Facilities, \nInterconnection Facilities, and, if applicable, any Reliability Upgrades or \nNetwork Upgrades required to provide the requested Interconnection. In \naddition, such party shall implement all existing operating procedures \nnecessary to safely and reliability interconnect such party’s generation, \nLarge Load, or wholesale load to the facilities of the Participating TO and \nto ensure the ISO Controlled Grid’s conformance with the ISO Grid \nPlanning Criteria, and shall bear all costs of implementing such operating \nprocedures. Any additional costs associated with accommodating the \nInterconnection shall be allocated in accordance with the cost \nresponsibility methodology set forth in Attachment A of the TO Tariff and \nthe ISO Tariff for transmission expansions or upgrades. \n8.1.3. [Reserved]  \n8.1.4. Due Diligence to Construct. The Participating TO shall use due diligence \nto construct, within a reasonable time, any Direct Assignment Facilities \nand any Reliability Upgrades that it is obligated to construct pursuant to \nthis TO Tariff and Section 24 of the ISO Tariff. The Participating TO’s \nobligation to build will be subject to: (1) its ability, after making a good \nfaith effort, to obtain any necessary approvals and property rights under \napplicable federal, state, and local laws; (2) the presence of a cost recovery \nmechanism with cost responsibility assigned to accordance with the ISO \nTariff or applicable FERC precedent; and (3) a signed Interconnection \nAgreement or a signed Expedited Interconnection Agreement, or, by \nmutual agreement of the parties, FERC acceptance for filing of an \nunexecuted Interconnection Agreement. \n8.1.5. Energization. The Participating TO shall not be obligated to energize, nor \nshall the applicant, Large Load, or wholesale load be entitled to have its \ninterconnection to the ISO Controlled Grid energized, unless and until an \nInterconnection Agreement has been executed, or filed at FERC pursuant \nto Section 10.17, and become effective and such applicant, Large Load, or \nwholesale load has demonstrated to the ISO’s reasonable satisfaction that \nit has complied with all of the requirements of the ISO Tariff and the \nrequirements of this TO Tariff. \n8.1.5.1. Large Load Energization. In addition to the requirements of \nSection 8.1.5, the Participating TO shall not be obligated to \nenergize a Large Load Interconnection until the Eligible Customer \nhas demonstrated to the Participating TO’s reasonable satisfaction \nthat: \n(i) the Interconnection Agreement and Cost Recovery \nAgreement have been executed, or have been filed with FERC \nunexecuted pursuant to Section 10.17 and become effective;"},{"page":26,"startToken":8489,"endToken":8835,"text":"18 \n(ii) to the extent the Large Load will withdraw Energy from the \nISO Controlled Grid (including for backup, standby, or \nmaintenance service), the Large Load will purchase that \nEnergy from an entity authorized to make such sales by, and in \naccordance with the requirements of, state law and the \napplicable Local Regulatory Authority, which may include the \nLarge Load acting as its own Load Serving Entity consistent \nwith Section 25.7.3.1 of the ISO Tariff; \n(iii) to the extent the Large Load will withdraw Energy from \nthe ISO Controlled Grid, a Scheduling Coordinator will \nrepresent the Large Load in compliance with Section 25.7.3 or \nSection 25.7.3.1 of the ISO Tariff, as applicable; \n(iv) Access Charges will be paid consistent with the ISO \nTariff; \n(v) the information required by Section 25.7.1 of the ISO \nTariff has been provided to the Participating TO; \n(vi) the monitoring, disturbance recording, telemetry, \ncommunication, control, protection, and disconnection \nequipment required by the Interconnection Agreement and \nSection 25.7.1 of the ISO Tariff has been installed, tested, and \ncommissioned; \n(vii) if FILI Service has been requested, the FILI Service \nAgreement has been executed and become effective; \n(viii) all financial security required under Section 13.2.1 and \nthe Cost Recovery Agreement has been provided; \n(ix) if the Large Load is co-located with, or served by behind-\nthe-meter, generation or storage, the control and system \nprotection technologies have been installed, tested, and \nvalidated by the Participating TO, and the Large Load is \nmetered separately from that generation and storage consistent \nwith Sections 25.7.5 and 11.36 of the ISO Tariff; and \n(x) the Large Load must meet all frequency ride-through \nrequirements, voltage ride through requirements, post-fault \nactive power recovery requirements, and ramp rate limitations \nin accordance with ISO Tariff Sections 25.7.1.1, 25.7.1.2, \n25.7.1.3, and 25.7.1.4. \n \n8.1.6. Coordination with ISO on Interconnection Requests. The Participating \nTO shall coordinate with the ISO, pursuant to the provisions of the TCA,"},{"page":27,"startToken":8835,"endToken":9278,"text":"19 \nin developing interconnection standards and guidelines for processing \ninterconnection request under this TO Tariff. \n8.2. \nParticipating TO Obligation to Construct Transmission Expansions or \nFacility Upgrades. The Participating TO shall be obligated to: (1) perform \nSystem Impact or Facilities Studies where the Project Sponsor or the ISO agrees \nto pay the study cost and specifies the project objectives to be achieved, and (2) \nbuild transmission additions and facility upgrades where the Participating TO is \nobligated to construct or expand facilities in accordance with and subject to the \nlimitations under Section 24 of the ISO Tariff and this TO Tariff. \n8.2.1. Obligation to Construct. A Participating To shall not be obligated to \nconstruct or expand transmission facilities or system upgrades unless and \nuntil the conditions stated in Section 9.2.1 hereof have been satisfied. \n8.3. \nRequest for FERC Deference Regarding Need Determination. It is intended \nthat FERC grant substantial deference to the factual determinations of the ISO, \n(including the ISO’s ADR Procedures), the CPUC, WECC, or RTG coordinated \nplanning processes as to the need for or construction of a facility, the need for full \ncost recovery, and the allocation of costs. \n9. \nParticipating TO Process for Construction or Expansion of Transmission Facilities  \n9.1. \nDetermination of Facilities. A Participating TO shall perform a Facilities Study \nin accordance with the Section where (1) the Participating TO is obligated to \nconstruct or expand facilities in accordance with Section 24 of the ISO Tariff and \nthis TO Tariff; (2) a Market Participant agrees to pay the costs of the Facilities \nStudy and specifies the project objectives to be achieved in terms of increase \ncapacity or reduce congestion; or (3) the Participating TO is required to perform a \nFacilities Study pursuant to the ISO Tariff. \n9.1.1. Payment of Facilities Study’s Cost. \n9.1.1.1. Market Participant to Pay for Facilities Study. Where a Market \nParticipant requests a Facilities Study and the need for the \ntransmission addition or upgrade has not bet been established in \naccordance with the procedures established herein and the ISO \nTariff, the Market Participant shall pay the cost of the Facilities \nStudy. \n9.1.1.2. Project Sponsor or Project Proponent to Pay for Facilities \nStudy. Where the facilities to be added or upgraded have been \ndetermined to be needed in accordance with the procedures \nestablished herein, the Project Sponsor, Project Proponent, or the \nISO requesting the study shall pay in advance the reasonable cost \nof the Facilities Study. When the Participating TO is the Project \nSponsor in accordance with the ISO Tariff, the costs of the \nFacilities Study shall be recovered through its Access Charges and"},{"page":28,"startToken":9278,"endToken":9748,"text":"20 \ntransmission rates. \n9.1.1.3. Principal Beneficiaries to Pay for Facilities Study. Where the \nfacilities to be added or upgraded have been determined to be \nneeded and the principal beneficiaries have been identified by the \nISO or ISO ADR Procedures in accordance with the ISO Tariff, \nthe Project Sponsor and the identified principal beneficiaries shall \npay the reasonable cost of the Facilities Study, in such proportions \nas may be agreed, or, failing agreement, as determined in \naccordance with the ISO ADR Procedures. \n9.1.2. Payment Procedure. Where a Facilities Study is being conducted \npursuant to this TO Tariff, the Participating TO shall, within thirty days of \nthe receipt of all reasonably required information, tender to the Market \nParticipant, Project Sponsor, Project Proponent, ISO, or identified \nprincipal beneficiaries, as the case may be, a Facilities Study Agreement \nthat defines the scope, content, assumptions, and terms of reference for \nsuch study, the estimated time required to complete it, and such other \nprovisions as the parties may reasonably require and pursuant to which \nsuch Market Participant, Project Sponsor, Project Proponent, the ISO, or \nidentified principal beneficiaries agree to reimburse the Participating TO \nthe reasonable cost of performing the required Facilities Study. If the \nMarket Participant, Project Sponsor, Project Proponent, the ISO, or \nidentified principal beneficiaries, as the case may be, agree to the terms of \nthe Facilities Study Agreement, they shall execute the Facilities Study \nAgreement and return it to the Participating TO within ten Business Days. \nAlternatively, if the Market Participant, Project Sponsor, Project \nProponent, the ISO, or identified principal beneficiaries, as the case may \nbe, request the Participating TO to proceed with the Facilities Study and \ncommit to abide by the terms, conditions, and cost assignments ultimately \ndetermined under the ISO ADR Procedures, including any determination \nby FERC or appeal of a FERC determination in accordance with that \nprocess, the Participating TO shall promptly proceed with the Facilities \nStudy, and the parties shall submit the disputed terms for resolution under \nthe ISO’s ADR Procedures. \n9.1.3. Facilities Study Procedures. Upon receipt of an executed Facilities Study \nAgreement or alternative request to proceed as provided for in Section \n9.1.2, a copy of which has been provided to the ISO by the party \nrequesting the Facilities Study, the Participating TO will use due diligence \nto complete the required Facilities Study within a sixty (60) day period. If \nthe Participating TO is unable to complete the Facilities Study in the \nallotted time period, the Participating TO shall notify the Market \nParticipant or Eligible Customer and provide an estimate of the time \nneeded to reach a final determination along with an explanation of the \nreasons that additional time is required to complete the study. If additional \ntime is required, the Participating TO will use best efforts to complete the"},{"page":29,"startToken":9748,"endToken":10216,"text":"21 \nstudy within 10 months, provided adequate information is provided by all \nthe parties. \n9.2. \nObligation to Build. \n9.2.1. Due Diligence to Construct. Subject to Section 9.3 of this TO Tariff, the \nParticipating TO shall use due diligence to construct, within a reasonable \ntime, additions or upgrades to its transmission system that it is obligated to \nconstruct pursuant to the ISO Tariff and this TO Tariff. Alternatively, if a \nMarket Participant or Eligible Customer requests the Participating TO to \nfile an unexecuted Participation Agreement and commits to abide by the \nterms, conditions, and cost assignments determined to be just and \nreasonable under the ISO ADR Procedures, including any determination \nby FERC or on appeal of a FERC determination in accordance with that \nprocess, the Participating TO shall promptly file an unexecuted \nParticipation Agreement. Provided, however, that if the ISO ADR \nProcedures concerns whether the requesting entity is an Eligible \nCustomer, the Participating TO shall not be obligated to file an unexecuted \nParticipation Agreement or alternatively, if a Market Participant or \nEligible Customer requests the Participating TO to file an unexecuted \nParticipation Agreement and commits to abide by the terms, conditions, \nand cost assignments determined to be just and reasonable under the ISO \nADR Procedures, including any determination by FERC or on appeal of a \nFERC determination in accordance with that process, the Participating TO \nshall promptly file an unexecuted Participation Agreement. Provided, \nhowever, that if the ISO ADR Procedures concerns whether the requesting \nentity is an Eligible Customer, the Participating TO shall not be obligated \nto file an unexecuted Participation Agreement, commence construction of \nthe additions or upgrades or incur other costs under the Participation \nAgreement until a final order determining the just and reasonable rates, \nterms, and conditions for such Participation Agreement has been issued by \nthe applicable court or regulatory authority. The Participating TO’s \nobligation to build will be subject to: 1) its ability, after making a good \nfaith effort, to obtain the necessary approvals and property rights under \napplicable federal, state, and local laws; 2) the presence of a cost recovery \nmechanism with cost responsibility assigned in accordance with the ISO \nTariff; and 3) a signed Participation Agreement. The Participating TO will \nnot construct or expand its existing or planned transmission system, if \ndoing so would impair system reliability as determined through systems \nanalysis based on the Applicable Reliability Criteria. \n9.2.2. Delay in Construction or Expansion. If any event occurs that will \nmaterially affect the time for completion of new facilities, or the ability to \ncomplete them, the Participating TO shall promptly notify: (1) the Project \nSponsor with regard to facilities determined to be needed; (2) the Parties \nto the Participation Agreement with regard to facilities determined to be \nneeded pursuant to the ISO Tariff where principal beneficiaries were"},{"page":30,"startToken":10216,"endToken":10693,"text":"22 \nidentified; and (3) the ISO. In such circumstances, the Participating TO \nshall, within thirty days of notifying such Project Sponsor, Parties to the \nParticipation Agreement, and the ISO of such delays, convene a technical \nmeeting with such Project Sponsor, Parties to the Participation Agreement, \nand the ISO to discuss the circumstances which have arisen and evaluate \nany options available. The Participating TO also shall make available to \nsuch Project Sponsor, Parties to the Participation Agreement, and the ISO, \nas the case may be, studies and work papers related to the cause and extent \nof the delay and the Participating TO’s ability to complete the new \nfacilities, including all information that is in the possession of the \nParticipating TO that is circumstances which have arisen and evaluate any \noptions available. The Participating TO also shall make available to such \nProject Sponsor, Parties to the Participation Agreement, and the ISO, as \nthe case may be, studies and work papers related to the cause and extent of \nthe delay and the Participating TO’s ability to complete the new facilities, \nincluding all information that is in the possession of the Participating TO \nthat is reasonably needed to evaluate the alternatives. \n9.2.2.1 Alternatives to the Original Facility Additions. If the review \nprocess of Section 9.2.2 determines that one or more alternatives \nexist to the originally planned construction project, the \nParticipating TO shall present such alternatives for consideration to \nthe Project Sponsor, Parties to the Participation Agreement, and \nthe ISO, as the case may be. If upon review of any alternatives, \nsuch Project Sponsor, the ISO, or Parties to the Participation \nAgreement wish to evaluate or to proceed with one of the \nalternative additions or upgrades, such Project Sponsor, the ISO, or \nParties to the Participation Agreement may request that the \nParticipating TO prepare a revised Facilities Study pursuant to \nSections 9.1.1, 9.1.2, and 9.1.3 of this TO Tariff. In the event the \nParticipating TO concludes that no reasonable alternative exists to \nthe originally planned addition or upgrade and the Project Sponsor \nor Parties to the Participation Agreement or the ISO disagree, the \ndispute shall be resolved pursuant to the ISO ADR Procedure. \n9.2.2.2 Refund Obligation for Unfinished Facility Additions. If the \nParticipating TO and the Project Sponsor, the ISO, or Parties to the \nParticipation Agreement, as the case may be, mutually agree that \nno other reasonable alternatives exist, the obligation to construct \nthe requested additions or upgrades shall terminate and any deposit \nnot yet applied toward the expended project costs shall be returned \nwith interest pursuant to FERC Regulation 35.19(a)(2)(iii). \nHowever, the Project Sponsor and any identified principal \nbeneficiaries, as the case may be, shall be responsible for all costs \nprudently incurred by the Participating TO through the time the \nconstruction was suspended."},{"page":31,"startToken":10693,"endToken":11140,"text":"23 \n9.3. \nProvisions Relating to Transmission Construction on the Systems of Other \nTOs. \n9.3.1. Responsibility for Third Party Additions. A Participating TO shall not \nbe responsible for making arrangements for any engineering, permitting, \nand construction of transmission or distribution facilities on the system(s) \nof any other entity or for obtaining any regulatory approval for such \nfacilities. The Participating TO will undertake reasonable efforts through \nthe coordinated planning process to assist in making such arrangements, \nincluding, without limitation, providing any information or data required \nby such other electric system pursuant to Good Utility Practice. \n9.3.2. Coordination of Third-Party System Additions. Where transmission \nadditions or upgrades being built pursuant to the ISO Tariff require \nadditions or upgrades on other systems, to the extent consistent with \nSection 9.3 of this TO Tariff, the Participating TO shall coordinate \nconstruction on its own system with the construction required by others. \nThe Participating TO, after consultation with the ISO, the Project Sponsor, \nand Parties to the Participation Agreement, as the case may be, may defer \nconstruction if the new transmission facilities on another system cannot be \ncompleted in a timely manner. The Participating TO shall notify such \nProject Sponsor, Parties to the Participation Agreement, and the ISO, in \nwriting of the basis for any decision to defer construction and the specific \nproblems which must be resolved before it will initiate or resume \nconstruction of the new facilities. Within forty Business Days of receiving \nwritten notification by the Participating TO of its intent to defer \nconstruction pursuant to this section, such Project Sponsor, Parties to the \nParticipation Agreement, or the ISO may challenge the decision in \naccordance with the ISO ADR Procedure. \n10. \nInterconnection Process \n10.1. Applicability. All requests for Interconnection directly to the ISO Controlled \nGrid from Eligible Customers, including entities eligible to request such \nInterconnection under Section 210(a) of the FPA shall be processed pursuant to \nthe provisions of this Section 10. All requests for Interconnection of wholesale \ngeneration directly to the ISO Controlled Grid shall be processed pursuant to the \nprovisions of the ISO Tariff. A Large Load Interconnection must be requested in \ncompliance with this Section 10 in order to connect the facilities of the \nParticipating TO to the facilities of an Eligible Customer and must comply with \nSection 25.7 of the ISO Tariff. \n10.2. Voluntary Offer of Unbundled Retail Transmission Service. Pursuant to \nclause (ii) of the definition of Eligible Customer, TBC voluntarily offers \nunbundled retail transmission service to any End-Use Customer whose Point of \nInterconnection is on facilities owned by TBC. Such service consists solely of \nInterconnection to TBC’s facilities and associated access to the ISO Controlled"},{"page":32,"startToken":11140,"endToken":11653,"text":"24 \nGrid in accordance with the ISO Tariff and where consistent with state law, and \ndoes not include the sale of Energy, distribution service, or scheduling or \nsettlement in the ISO Markets. TBC shall provide such service on a non-\ndiscriminatory basis in accordance with this TO Tariff. \n10.3. Role of Participating TO; Coordination.  Participating TO will apprise the ISO \nof Large Load interconnections to its facilities through its inputs to the Base Case, \nInterconnection Studies, and Transmission Planning Process. After receiving a \nCompleted Large Load Interconnection Application, Participating TO will notify \nTOs with transmission facilities potentially affected by the proposed \nInterconnection. Participating TO will coordinate the conduct of any studies \nrequired to determine the impact of the Large Load Interconnection Application \nwith affected TOs, to the extent possible. The Participating TO will coordinate \nwith ISO and affected TOs to identify any upgrades to other TO transmission \nfacilities necessary to accommodate the Interconnection. Prior to energization of \nany Large Load to the ISO Controlled Grid, Participating TO will provide ISO \nwith the information required by Section 25.7.1 of the ISO Tariff, and the Eligible \nCustomer shall provide Participating TO such ISO Tariff Section 25.7.1 \ninformation, and notify it of any material change, within ten (10) Business Days. \n10.4. Applications. A party requesting Interconnection shall submit a written \nInterconnection Application which provides the information required in Section \n10.5 to the Participating TO and shall send a copy of the application to the ISO. \nThe Participating TO shall time-stamp the application to establish study priority \non a rolling basis. \n10.5. Interconnection Application. An Interconnection Application shall provide all \nthe information listed in 18 CFR§2.20, including, but not limited to, the \nfollowing: (i) the identity, address, telephone number, and email of the entity \nrequesting interconnection; (ii) the Interconnection point(s) to the ISO Controlled \nGrid contemplated by the applicant; (iii) the resultant (or new) maximum amount \nof Interconnection capacity contemplated by the applicant; (iv) the proposed date \nfor energizing the Interconnection and the term of the Interconnection service, and \n(v) such other information as the Participating TO reasonably required to process \nthe application . In addition to the information specified above, the following \ninformation may also be provided in order to properly evaluate system conditions: \n(vi) If the applicant is an Eligible Customer requesting Large Load \nInterconnection or wholesale load, the electrical location of the source of the \npower (if known) to be transmitted pursuant to applicant’s request for \nInterconnection. If the source of the power is not known, a system purchase will \nbe assumed. If the location of the load is not known, a system sale will be \nassumed; and, in addition, if an applicant proposes to perform or cause a third \nparty to perform any required System Impact Study or any required Facilities \nStudy, it shall so indicate in its Interconnection Application. The results of any \nstudy or studies performed by an applicant must be approved by both the ISO and \nthe Participating TO. An Interconnection applicant must pay a $5,000 \nnonrefundable application fee."},{"page":33,"startToken":11653,"endToken":12109,"text":"25 \n \n10.5.1. Large Load Interconnection Application.  In addition to Section 10.5, \nan Interconnection Application from an Eligible Customer for a Large \nLoad must provide (i) the proposed Large Load’s ramp schedule, \nidentifying load additions over time and the Large Load’s maximum \nplanned load; (ii) a site plan; (iii) documentation demonstrating that the \nLarge Load has local, state, and federal permits and/or regulatory \napprovals necessary for the development of its Large Load; (iv) \ndocumentation demonstrating that the Large Load has Site Control; (v) a \nsingle-line electrical diagram; (vi) information regarding any other \nInterconnection requests in the applicant’s footprint that are made on \nbehalf of the same Large Load or any of its affiliates; (vii) affirmation \nregarding whether the Large Load intends to request Partial Interim \nService or FILI Service; and (viii) if the applicant is submitting an \nInterconnection Application for a Large Load co-located with a \nGenerating Facility, additional information concerning the Generating \nFacility sufficient to allow the Participating TO to ensure compliance \nwith the requirements of Sections 25.1.1, 25.7.5, and 25.7.6 of the ISO \nTariff. A site subject to a development moratorium or other governmental \nrestriction that prohibits the proposed use shall not satisfy the Site \nControl requirement unless the restriction has been lifted or the applicant \nhas obtained all necessary approvals, exemptions, or variances permitting \nthe proposed use. \n10.6. Completed Interconnection Application. Within ten (10) Business Days after \nreceipt of an Interconnection Application, the Participating TO and the ISO if \napplicable shall determine whether the application is complete (“Completed \nInterconnection Application”). Whenever possible, the Participating TO will \nattempt to remedy deficiencies in the Interconnection Application through \ninformal communications with the applicant. If such efforts are unsuccessful, the \nParticipating TO shall return the Interconnection Application to the applicant. The \nParticipating TO will treat the information in the Interconnection Application, \nincluding the applicant’s identity, as confidential at the request of the applicant \nexcept to the extent that disclosure of the information is required by this TO \nTariff, by regulatory or judicial order, for reliability purposes pursuant to Good \nUtility Practice, or pursuant to RTG or ISO transmission information sharing \nagreements. The Participating TO shall treat this information consistent with the \nstandards of conduct contained in Part 37 of FERC’s regulations. \n10.6.1. Amendment to Completed Interconnection Application. An applicant \nshall only be limited to amending its Completed Interconnection \nApplication once. Such amendment shall occur on or before ten (10) \nBusiness Days following the date the Participating TO tenders any \nFacilities Study Agreement. Specifically, an applicant may submit an \namendment to its Completed Interconnection Application to reflect a \nrevised configuration for its facility. The amended Completed \nInterconnection Application shall be treated in accordance with Section 25"},{"page":34,"startToken":12109,"endToken":12605,"text":"26 \nof the ISO Tariff and Section 10.6 of this TO Tariff; the applicant’s \nCompleted Interconnection Application shall be deemed withdrawn; and \nthe applicant shall maintain its existing queue position, if (a) the amended \nCompleted Interconnection Application is received by the Participating \nTO within ten (10) Business Days of the Participating TO’s tender of a \nFacilities Study Agreement; and (b) the applicant has not submitted a \nprevious amendment to the Completed Interconnection Application. In the \nevent an applicant amends its Completed Interconnection Application, it \nwill be responsible for any additional study costs that result from that \namendment, including costs associated with revisions to studies for other \napplicants holding later queue positions. \n10.7. Review of Completed Interconnection Application. After receiving a \nCompleted Interconnection Application, the Participating TO and the ISO, if \napplicable, will determine on a non-discriminatory basis whether a System Impact \nStudy is required. Whenever the Participating TO, and the ISO, if applicable, \ndetermines that a System impact Study is not required and that neither Reliability \nUpgrades nor changes in existing operating procedures are required, the \nParticipating TO shall notify the applicant within ten (10) Business Days of the \nCompleted Application Date. If the Interconnection can be accommodated \nwithout any additions or upgrades, then within thirty (30) Business Days of such \nnotice from the Participating TO, the applicant shall request the Participating TO \nto tender to the applicant an Interconnection Agreement within thirty (30) \nBusiness Days of such request. The Participating TO shall tender to the applicant \nan Interconnection Agreement as provide in Section 10.17. \n10.8. Notice of Need for System Impact Study. If the Participating TO, and the ISO, \nif applicable, determines that a System Impact Study is necessary to accommodate \nthe requested Interconnection, the Participating TO shall so inform the applicant, \nwithin ten (10) Business Days of the Completed Application Date.  \n10.9. System Impact Study Agreement. In such cases, the Participating TO shall \nwithin ten (10) Business Days of receipt of a Completed Interconnection \nApplication, tender a System Impact Study Agreement that defines the scope, \ncontent, assumptions and terms of reference for such study to be completed by the \nParticipating TO, the estimated time required to complete it, and such other \nprovisions as the parties may reasonably require, and pursuant to which the \napplicant shall agree to reimburse the Participating TO for the reasonable actual \ncosts of performing the required System Impact Study. A description of the \nParticipating TO’s transmission assessment practices for completing a System \nImpact Study is provided in the Participating TO’s FERC Form 715. \nAlternatively, if the applicant will perform the System Impact Study, the \nParticipating TO shall within ten (10) Business Days of receipt of a Completed \nInterconnection Application, tender a System Impact Study Agreement that \ndefines the scope, content, assumptions and terms of reference for such study to \nbe reviewed by the Participating TO; the estimated time required to complete it; \nand such other provisions as the parties may reasonably require, and pursuant to"},{"page":35,"startToken":12605,"endToken":13094,"text":"27 \nwhich the applicant shall agree to reimburse the Participating TO for the \nreasonable actual costs of reviewing the required System Impact Study.  \n10.10. Execution of System Impact Study Agreement. For an Interconnection request \nto remain a Completed Interconnection Application, the applicant shall execute \nthe System Impact Study Agreement and return it to the Participating TO within \nten (10) Business Days together with payment for the reasonable estimated cost of \nperforming the System Impact Study or reviewing the applicant’s System Impact \nStudy. Alternatively, if the applicant request the participating TO to proceed with \nthe System Impact Study or review thereof and commits to abide by the terms, \nconditions, and cost assignments ultimately determined under the ISO ADR \nProcedures, including any determination by FERC or appeal of a FERC \ndetermination in accordance with that process, the Participating TO shall \npromptly proceed with the System Impact Study provided that such request is \naccompanied by payment of the reasonable estimated cost of the System Impact \nStudy, and the parties shall submit the disputed terms for resolution under the \nISO’s ADR Procedures. If the applicant elects not to execute a System Impact \nStudy Agreement, and does not request that the Participating TO proceed with the \nSystem Impact Study or review thereof, its application shall be deemed \nwithdrawn, and the applicant shall reimburse to the Participating TO all costs \nreasonably incurred in processing the application. \n10.11. System Impact Study Cost Reimbursement and Agreement. \n10.11.1. Cost Reimbursement. The System Impact Study Agreement shall \nclearly specify the charge, based on the Participating TO’s estimate of the \ncost and time for completion of the System Impact Study. The charge \nshall not exceed the reasonable actual cost of the study. In performing the \nSystem Impact Study, the Participating TO shall rely, to the extent \nreasonably practicable, on existing transmission planning studies. The \napplicant will not be assessed a charge for such existing studies; however, \nthe applicant will be responsible for the reasonable charges associated \nwith any modifications to existing planning studies that are reasonably \nnecessary to evaluate the impact on the applicant’s request.  The \nParticipating TO must refund any excess study deposit funds to the \nEligible Customer, and the Eligible Customer must reimburse the \nParticipating TO for any unpaid study costs in excess of the deposit. \n10.11.2. Large Load Interconnection Study Deposit. For Eligible Customer \napplicants, the Eligible Customer shall remit a study deposit consisting of \n(a) $35,000 plus $1,000 per MW for Interconnection less than 80 MW; \n(b) $150,000 for Interconnection greater than or equal to 80 MW but less \nthan 200 MW; or (c) $250,000 for Interconnection greater than 200 MW.  \nThe Eligible Customer shall remit the study deposit and financial security \ntogether with the executed System Impact Study Agreement, or with its \nrequest to proceed pursuant to Section 10.10, no later than ten (10) \nBusiness Days after the Participating TO tenders the System Impact"},{"page":36,"startToken":13094,"endToken":13584,"text":"28 \nStudy Agreement. The study deposit shall satisfy the Eligible Customer’s \nobligation under Section 10.10 to pay the reasonable estimated cost of the \nSystem Impact Study. If the Eligible Customer fails to remit the full \nstudy deposit and financial security within that period, its Interconnection \nApplication shall cease to be a Completed Interconnection Application \nand shall be deemed withdrawn. \n \n10.11.3. Multiple Parties. If multiple parties request Interconnection at the same \nlocation, the Participating TO may conduct a single System Impact \nStudy. The costs of that study shall be pro-rated among the parties \nrequesting Interconnection. \n10.12. System Impact Study Procedures. Upon receipt of an executed System impact \nStudy Agreement or initiation of the ISO ADR Procedures and receipt of payment \nfor estimated study costs and financial security if applicable, the Participating TO \nshall either (a) complete the required System Impact Study no later than ninety \n(90) calendar days after the Completed Application Date or (b) complete its \nreview of an applicant’s System Impact Study within thirty (30) calendar days of \nits receipt of the completed study. In performing the System Impact Study, the \nParticipating TO shall rely, to the extent reasonably practicable, on existing \ntransmission planning studies. The applicant will not be assessed a charge for \nsuch existing studies; however, the applicant will be responsible for the \nreasonable charges associated with any modifications to existing planning studies \nthat are reasonably necessary to evaluate the impact of the applicant’s request.  \nThe System Impact Study will identify whether any Interconnection Facilities, \nDirect Assignment Facilities, Network Upgrades, or Reliability Upgrades are \nnecessary to deliver a facility’s full output over the ISO Controlled Grid, or any \ntransmission additions or upgrades are necessary to serve a wholesale load or an \nEligible Customer. The System Impact Study will also identify any adverse \nimpact on Encumbrances existing as of the applicant’s Completed Application \nDate. In the event that the Participating TO is unable to complete the required \nSystem Impact Study within such time period, it shall so notify the applicant, in \nwriting, and provide an estimated completion date along with an explanation of \nthe reasons why additional time is required to complete the required studies. A \ncopy of the completed System Impact Study and related work papers shall be \nmade available to the applicant and the ISO. The Participating TO shall notify the \napplicant and the ISO immediately upon completion of the System Impact Study. \n10.12.1. Large Load System Impact Study Procedures.  In addition to Section \n10.12, for Large Load, the System Impact Study shall also evaluate the \noperational characteristics of the Large Load, including its ramp \nschedule, its performance during system disturbances, and any ability to \nlimit its withdrawals from the ISO Controlled Grid, consistent with \nSection 25.7.1 of the ISO Tariff. The Participating TO will evaluate \nimpacts to the transmission system using power flow and short circuit \nanalyses, and any other analyses that may be appropriate including"},{"page":37,"startToken":13584,"endToken":14055,"text":"29 \nElectromagnetic Transient studies where warranted. The Participating TO \nwill consider alternative transmission technologies in the System Impact \nStudy process. If traditional Network Upgrades are selected instead of \nalternative transmission technologies, the Participating TO will provide a \ndemonstration of why alternative transmission technologies are not \nfeasible or would not result in lower costs or a faster timeline for \naccommodating the Large Load Interconnection Application. A \ncompleted System Impact Study for a Large Load Interconnection \nApplication shall include a non-binding good-faith estimate of the cost of \nDirect Assignment Facilities and Network Upgrades necessary to \naccommodate the applicant’s request and the time required to construct \nthem, which estimates shall be refined in any Facilities Study. \n10.12.2. Applicant Information; Extension of Study Period. The applicant is \nresponsible for the accuracy and completeness of the information in its \nCompleted Interconnection Application and any information provided \nunder this Section. The Participating TO may rely on such information in \nperforming the System Impact Study. If such information is inaccurate or \nincomplete, the applicant shall bear the reasonable costs of any resulting \nrestudy, including any restudy of later-queued applicants, and any \napplicable deadlines shall be extended accordingly. The Participating TO \nmay request in writing additional information, data, or models reasonably \nnecessary to perform the System Impact Study, including, for an Eligible \nCustomer, models suitable for Electromagnetic Transient studies where \nwarranted. The applicant shall provide complete responsive information \nwithin ten (10) Business Days of the request. The study period in Section \n10.12 shall be extended by the number of calendar days from a request \nuntil the Participating TO receives complete responsive information. If \nthe applicant does not provide complete responsive information within \ntwenty (20) Business Days of a request, the Participating TO shall notify \nthe applicant in writing, and if the applicant does not cure within five (5) \nBusiness Days of that notice, its Interconnection Application shall be \ndeemed withdrawn. The applicant shall reimburse the Participating TO \nfor all costs reasonably incurred, which may include the cost of \nrestudying later-queued applicants, after which any unused study deposit \nshall be refunded and any financial security released. \n10.13. Procedures Upon Completion of System Impact Study. Within fifteen (15) \nBusiness Days of completion of the System Impact Study or review and approval \nof an applicant’s System Impact Study, the Participating TO shall notify the \napplicant whether the transmission system will be adequate to accommodate all of \na request for Interconnection. If no costs are likely to be incurred for any Direct \nAssignment Facilities, any Reliability Upgrades, or implementing any operating \nprocedures, then within thirty (30) Business Days of receipt of written approval of \nthe applicant’s System Impact Study from the Participating TO and the ISO the \napplicant shall request the Participating TO to tender an Interconnection \nAgreement within thirty (30) Business Days of such request. The Participating TO"},{"page":38,"startToken":14055,"endToken":14578,"text":"30 \nshall tender to the applicant an Interconnection Agreement as provided in Section \n10.17. If costs are likely to be incurred to accommodate a request for \nInterconnection, the Participating TO shall tender to the applicant a Facilities \nStudy Agreement pursuant to Section 10.8. \n10.14. Notice of Need for Facilities Study. If a System Impact Study indicates that \nadditions or upgrades to the ISO Controlled Grid are needed to satisfy an \napplicant’s request for Interconnection, the Participating TO shall, within fifteen \n(15) Business Days of the date of the System Impact Study or the completion of \nreview and approval of the applicant’s System Impact Study by the Participating \nTO, tender to the applicant a Facilities Study Agreement that defines the scope, \ncontent, assumptions and terms of reference for such study to be completed by the \nParticipating TO; the estimated time required to complete the required study; and \nsuch other provisions as the parties may reasonably require, and pursuant to \nwhich the applicant agrees to reimburse the Participating TO for the reasonable \nactual costs of performing the required Facilities Study. Alternatively, if the \napplicant will perform the Facilities Study, the Participating TO shall within \nfifteen (15) Business Days of the completion date of the System Impact Study or \nthe completion of review and approval of the applicant’s System Impact Study, \ntender a Facilities Study Agreement that defines the scope, content, assumptions \nand terms of reference for such study to be reviewed by the Participating TO; the \nestimated time required to complete the required review; and such other \nprovisions as the parties may reasonably require, and pursuant to which the \napplicant agrees to reimburse the Participating TO for the reasonable actual costs \nof reviewing the required Facilities study.  \n10.15. Execution of Facilities Study Agreement. For an Interconnection request to \nremain a Completed Interconnection Application, the applicant shall execute the \nFacilities Study Agreement and return it to the Participating TO within ten (10) \nBusiness Days together with payment for the reasonable estimated costs of \nperforming the Facilities Study or reviewing the applicant’s Facilities Study. \nAlternatively, if the applicant request the Participating TO to proceed with the \nFacilities Study or review thereof and commits to abide by the terms, conditions, \nand cost assignments ultimately determined under the ISO ADR Procedures, \nincluding any determination by FERC or appeal of a FERC determination in \naccordance with that process, the Participating TO shall promptly proceed with \nthe Facilities Study provided that such request is accompanied by payment for the \nreasonable estimated cost of the Facilities Study, and the parties shall submit the \ndisputed terms for resolution under the ISO ADR Procedures. If the applicant \nelects not to execute a Facilities Study Agreement and does not request that the \nParticipating TO proceed with the Facilities Study or review thereof, its \napplication shall be deemed withdrawn and the applicant shall reimburse to the \nParticipating TO all costs reasonably incurred in processing the application not \ncovered by the System Impact Study Agreement, which may include the cost of \nrestudying later-queued applicants, after which any security will be released. \n10.16. Facilities Study Procedures. Upon receipt of an executed Facilities Study"},{"page":39,"startToken":14578,"endToken":15066,"text":"31 \nAgreement or initiation of the ISO ADR Procedures and receipt of payment for \nthe estimated study costs, the Participating TO will use due diligence to either (a) \ncomplete the required Facilities Study within a sixty (60) calendar day period or \n(b) complete its review of an applicant’s Facilities Study within thirty (30) \ncalendar days of its receipt of the Completed Study. The Facilities Study shall \ndetermine required modifications to the Participating TO’s transmission system, \nincluding the estimated cost and scheduled completion date for such \nmodifications that will be required to provide needed services.  In the event that \nthe Participating TO is unable to complete the required Facilities Study within \nsuch time period, it shall so notify the applicant, in writing, and provide an \nestimated completion date along with an explanation of the reasons why \nadditional time is required to complete the required studies. A copy of the \ncompleted Facilities Study shall be made available to the applicant. \n10.16.1. Tender of Interconnection Agreement. Within thirty (30) Business \nDays of receipt of the completed Facilities Study performed by the \nParticipating TO or receipt of written approval of the applicant’s \nFacilities Study from the Participating TO, the applicant shall request the \nParticipating TO to tender an Interconnection Agreement within thirty \n(30) Business Days of such request. The Participating TO shall tender to \nthe applicant an Interconnection Agreement as provided in Section 10.17. \n10.17. Interconnection Agreement. Pursuant to Section 10.7, 10.12.3, or 10.16.1, a \nparty requesting an Interconnection shall request in writing that the Participating \nTO tender to such party an Interconnection Agreement that will be filed with \nFERC, or the Local Regulatory Authority, in the case of a Local Publicly Owned \nElectric Utility. The Interconnection Agreement shall include, without limitation, \ncost responsibilities, financial security, and payment provisions for any \nengineering, equipment, construction, ownership, operation and maintenance \ncosts for any Direct Assignment Facilities, Reliability Upgrades, Interconnection \nFacilities, or Network Upgrades. Large Load Interconnection Agreements shall \ncontain requirements for the Eligible Customer to comply with Section 25.7.1 of \nthe ISO Tariff, including but not limited to the Frequency Ride-Through \nRequirements, Voltage Ride-Through Requirements, Post-Fault Active Power \nRecovery Requirements, and Ramp-Rate Limitations. The Large Load \nInterconnection Agreement shall contain provisions requiring the installation and \nmaintenance of any equipment or facilities necessary for the Participating TO to \nensure its ability to disconnect or otherwise isolate the Large Load as required by \nSection 25.7.1 of the ISO Tariff. The Large Load Interconnection Agreement \nshall include requirements for the Scheduling Coordinator for each Large Load to \nprovide daily and hourly forecasts, material real-time deviations, outage \ninformation, and real-time telemetry consistent with Section 25.7.3 of the ISO \nTariff. For an Interconnection request to remain a Completed Interconnection \nApplication, the party requesting the Interconnection shall execute the \nInterconnection Agreement and return it to the Participating TO within thirty (30) \nBusiness Days of receipt."},{"page":40,"startToken":15066,"endToken":15505,"text":"32 \n10.17.1. Filing Unexecuted. Alternatively, if an Eligible Customer requesting the \nInterconnection requests the Participating TO to file an unexecuted \nInterconnection Agreement and commits to abide by the terms, \nconditions, and cost assignments determined to be just and reasonable \nunder the ISO ADR Procedures, including any determination by FERC or \non appeal of a FERC determination in accordance with that process, the \nParticipating TO shall promptly file an unexecuted Interconnection \nAgreement. Provided, however, that if the ISO ADR Procedures concerns \nwhether the requesting entity is an Eligible Customer, the Participating \nTO shall not be obligated to file an unexecuted interconnection \nAgreement or commence construction of the Interconnection Facilities or \nincur other costs under the Interconnection Agreement until a final order \ndetermining the just and reasonable rates, terms, and conditions for such \nInterconnection Agreement has been issued by the applicable court or \nregulatory authority.  \n10.17.2. Cost Recovery. The Interconnection Agreement will set forth a payment \nschedule that enables the Participating TO to recover its costs. For Large \nLoad requesting Interconnection, the Participating TO, Eligible \nCustomer, and ISO at its election shall enter into a Cost Recovery \nAgreement in the form of Attachment A to this Participating TO Tariff. \nThe Cost Recovery Agreement shall obligate the Eligible Customer for \none-hundred (100) percent of the costs incurred to serve the Eligible \nCustomer’s Large Load. The Participating TO may seek an alternative \ncost recovery structure before FERC by filing a nonconforming Cost \nRecovery Agreement.  \n10.17.3. Withdrawn Completed Interconnection Agreement.  If the applicant \nelects not to execute the Interconnection Agreement and does not request \nthe Participating TO to file an unexecuted Interconnection Agreement, its \nCompleted Interconnection Agreement shall be deemed withdrawn, and \nthe applicant shall reimburse to the Participating TO all costs reasonably \nincurred in processing the application not covered by any System Impact \nStudy Agreement or Facilities Study Agreement, which may include the \ncost of restudying later-queued applicants. To maintain its queue \nposition, the applicant must timely comply with the Interconnection \nrequirements of Section 25 of the ISO Tariff and Sections 8.1 and 10 of \nthis TO Tariff. If the applicant fails to timely comply with such \nInterconnection requirements, such applicant shall pay the reasonable \ncosts of revising the System Impact Studies for other applicants that have \nestablished a new queue position due to the applicant either withdrawing \nits Interconnection Application or because its queue position has been \nmodified pursuant to the queuing provisions in Section 25 of the ISO \nTariff. \n10.18. Large Load Partial Interim Service and FILI Service Requests. If the Eligible \nCustomer has requested Partial Interim Service and/or FILI Service, the"},{"page":41,"startToken":15505,"endToken":15937,"text":"33 \nParticipating TO shall perform an analysis and report the extent to which each \nrequested interim services can be provided consistent with this TO Tariff and \nSection 25.7.2 of the ISO Tariff. The maximum amount that may be provided will \nbe based on the anticipated availability of capacity and the information submitted \nby the Eligible Customer. The Participating TO shall update this analysis \nannually. \n10.18.1. Partial Interim Service. If the Participating TO determines that there \nwill not be adequate transmission capability to satisfy the full amount \nrequested in a Completed Interconnection Application, the Participating \nTO nonetheless shall be obligated to offer and provide the portion of the \nrequested Interconnection that can be accommodated without any \nadditional Direct Assignments Facilities or Reliability Upgrades. \nHowever, the Participating TO shall not be obligated to provide the \nincremental amount of requested Interconnection that requires such \nadditional facilities or upgrades until such facilities or upgrades have \nbeen placed in service. \n10.18.2. FILI Service. FILI Service will be available if the Large Load has the \nability to reduce the load at a specified Point of Interconnection pursuant \nto Section 10.18.4, according to the timelines and protocols that will be \nset forth in an executed and effective FILI Service Agreement attached to \nthe Eligible Customer’s Interconnection Agreement and to be entered into \nbetween the Large Load or its authorized agent (which may be the \nEligible Customer), the Participating TO, and the ISO. The FILI Service \nAgreement will specify the Network Upgrades or Interconnection \nFacilities necessary to conclude FILI Service and provide full \nInterconnection service. ISO will post the FILI Service Agreement on the \nISO Website. \n10.18.3. FILI Service Reliability Requirements. The FILI Service Agreement \nwill identify what Large Load Interconnection Facilities must be \ninstalled, the necessary protection and control systems and any other \nequipment necessary to be installed, and operating limitations to allow \nthe Large Load to withdraw energy. FILI Service shall not commence \nuntil the Participating TO and Eligible Customer have completed \ninstallation and commissioning of all equipment specified under the FILI \nService Agreement. \n10.18.4. Curtailment of FILI Service. The ISO, Participating TO, and Large \nLoad or its authorized agent (which may be the Eligible Customer), will \ninclude in the FILI Service Agreement a description of the circumstances, \ncontingencies, or operating conditions in which the Large Load receiving \nFILI may be temporarily curtailed and the mechanism used to perform \nthe curtailment. The FILI Service Agreement will further specify the \nentity responsible for performing the curtailment in each circumstance, \ncontingency, or operating condition; the notification methodology, the"},{"page":42,"startToken":15937,"endToken":16425,"text":"34 \nresponse time(s) required, the duration of curtailment permissible and \ntimeline for restoration, testing and verification requirements, and interim \noperating limits pending full Interconnection. \n10.18.5. Exceedance and Termination of FILI Service. Should the Large Load \nor Eligible Customer not adhere to the terms of the FILI Service \nAgreement required by Section 10.18.2, ISO and/or the Participating TO \nmay terminate the FILI Service Agreement and disconnect service to the \nLarge Load in order to preserve reliable operations of the system and \nmaintain Good Utility Practice in carrying out such disconnection and \nany subsequent reconnection. \n10.18.6. Co-Located Large Load. The interconnection processes applicable to a \nco-located Large Load shall be the same as those that apply to Large \nLoad under this Participating TO Tariff where the co-located Large \nLoad’s Interconnection complies with Section 25.1.1 of the ISO Tariff. \nFor co-located Large Loads that will not inject Energy onto the ISO \nControlled Grid in compliance with Section 25.1.1 of the ISO Tariff, the \nParticipating TO will ensure that the co-located Generating Facilities \nhave sufficient control technologies to ensure no material impact on the \nISO Controlled Grid, and such requirement will be incorporated into the \nco-located Large Load’s Interconnection Agreement. The Participating \nTO shall study all other co-located Large Loads and Generating Facilities \ntogether and in accordance with Section 25.7.6 of the ISO Tariff, and \nshall require specific information regarding the net injection and/or net \nwithdrawal from the combined facility.  For any conflict between the ISO \nTariff and the Participating TO Tariff pertaining to the interconnection of \nthe Generating Unit, the ISO Tariff will apply. For any conflict between \nthe ISO Tariff and the Participating TO Tariff pertaining to the \ninterconnection of the Large Load, the Participating TO Tariff will apply. \n10.19. Expedited Interconnection Procedures. In lieu of the procedures set forth \nabove, the applicant shall have the option to expedite the processing of its \nCompleted Interconnection Application. In order to exercise this option, the \napplicant shall submit in writing a Request for Expedited Interconnection \nProcedures to the Participating TO within ten (10) Business Days after receiving a \ncopy of the System Impact Study for the proposed Interconnection. Within ten \n(10) Business Days after receiving a Request for Expedited Procedures, the \nParticipating TO shall tender an Expedited Interconnection Agreement that \nrequires the applicant to compensate the Participating TO for all costs reasonably \nincurred pursuant to the terms of this To Tariff for processing the Completed \nInterconnection Application and providing the requested Interconnection. While \nthe Participating TO agrees to provide the applicant with its best estimate of the \ncosts of any needed Direct Assignment Facilities and, if applicable, Reliability \nUpgrades, and such other charges that may be incurred, unless otherwise agreed \nby the parties, such estimate shall not be binding and the applicant must agree in \nwriting to compensate the Participating TO for all actual Interconnection costs"},{"page":43,"startToken":16425,"endToken":16910,"text":"35 \nreasonably incurred pursuant to the provisions of this TO Tariff. The applicant \nshall execute and return such Expedited Service Agreement within ten (10) \nBusiness Days of its receipt or the applicant’s request for Interconnection will \ncease to be a Completed Interconnection Application and will be deemed \nterminated and withdrawn. In that event, the applicant shall reimburse the \nParticipating TO for all costs reasonably incurred in processing the application \nnot covered by the terms of the System Impact Study Agreement. \n10.20. Transition for Large Loads. Consistent with Section 25.7 of the ISO Tariff, the \nprovisions of this TO Tariff specific to Eligible Customers and Large Loads shall \nnot apply to a Load that is operational or has a Completed Interconnection \nApplication before February 16, 2027, unless and until the Load is modified or \nincreased such that it would be a Large Load, or the Load elects to be treated as a \nLarge Load.  \n \n11. \nUncontrollable Forces and Indemnification \n11.1. Procedures to Follow If Uncontrollable Force Occurs. In the event of the \noccurrence of an Uncontrollable Force which prevents a Party from performing \nany of its obligations under this TO Tariff, such Party shall (i) immediately notify \nthe other Parties in writing of the occurrence of such Uncontrollable Force, (ii) \nnot be entitled to suspend performance in any greater or longer duration that is \nrequired by the Uncontrollable Force, (iii) use its best efforts to mitigate the \neffects of such Uncontrollable Force, remedy its inability to perform, and resume \nfull performance hereunder, (iv) keep the other Parties apprised of such efforts on \na continual basis and (v) provide written notice of the resumption of performance \nhereunder. Notwithstanding any of the foregoing, the settlement of any strike, \nlockout, or labor dispute constituting an Uncontrollable Force shall be within the \nsole discretion of the Party to this TO Tariff involved in such strike, lockout, or \nlabor dispute, and the requirement that a Party must use its best efforts to remedy \nthe cause of the Uncontrollable Force and mitigate its effects and resume full \nperformance hereunder shall not apply to strikes, lockouts, or labor disputes. No \nParty will be considered in default as to any obligation under this TO Tariff if \nprevented from fulfilling the obligation due to the occurrence of an \nUncontrollable Force. \n11.2. Indemnification. A Market Participant or Eligible Customer shall at all times \nindemnify, defend, and save the Participating TO harmless from any and all \ndamages, losses, claims, (including claims and actions relating to injury or to \ndeath of any person or damage to property), demands, suits, recoveries, costs and \nexpenses, court costs, attorney fees, and all other obligations by or to third parties, \narising out of or resulting from the Participating TO’s performance of its \nobligations under this TO Tariff on behalf of a Market Participant or Eligible \nCustomer, except in cases of negligence or intentional wrongdoing by the \nParticipating TO."},{"page":44,"startToken":16910,"endToken":17390,"text":"36 \n12. \nRegulatory Filings. Nothing contained herein shall be construed as affecting, in any \nway, the right of any electric utility (as defined by the Federal Power Act) Participating \nTO furnishing services in accordance with this TO Tariff, or any tariff and rate schedule \nwhich results from or incorporates this TO Tariff, unilaterally to make application to \nFERC as it deems necessary and appropriate to recover its Transmission Revenue \nRequirements, or for a change in its rates, including changes in rate methodology, or for a \nchange in designation of transmission facilities to be placed under the ISO’s control, in \neach case under Section 205 of the FPA and pursuant to the FERC’s Rules and \nRegulations promulgated thereunder. Nothing contained herein shall be construed as \naffecting in any way the ability of any Eligible Customer receiving services in \naccordance with this TO Tariff to exercise its rights under the Federal Power Act and \npursuant to the FERC’s rules and regulations promulgated thereunder. \n12.1. Open Access. For purposes of the Stranded Cost Recovery available under Order \nNos. 888 and 888-A, this Tariff, combined with the ISO Tariff and wholesale \ndistribution access tariff, if any, shall be considered an open access tariff under \nFERC Order Nos. 888 and 888-A. \n13. \nCreditworthiness and Financial Security. \n13.1. UDCs, MSSs, and Scheduling Coordinators Using the Participating TO’s \nLow Voltage Transmission Facilities. For the purpose of determining the ability \nof a UDC, MSS, and Scheduling Coordinator to meet its obligations related to \nservice using the Participating TO’s Low Voltage Transmission Facilities \nhereunder where the Participating TO is collecting the Low Voltage Access \nCharge directly from each UDC, MSS and Scheduling Coordinator, the \nParticipating TO may require reasonable credit review procedures for the UDC, \nMSS, or Scheduling Coordinator. This review shall be made in accordance with \nstandard commercial practices. In addition, the Participating TO may require the \nUDC, MSS, or Scheduling Coordinator to provide and maintain in effect during \nthe term of the service, an unconditional and irrevocable letter of credit as security \nto meet its responsibilities and obligations under this TO Tariff, or an alternative \nform of security proposed by the UDC, MSS, or Scheduling Coordinator and \nacceptable to the Participating TO, and consistent with commercial practices \nestablished by the Uniform Commercial Code, that protect the Participating TO \nagainst the risk of non-payment. \n13.2. End-Users. Creditworthiness rules applicable to End-Users shall be pursuant to \nthe then-current rules of the applicable Local Regulatory Authority, except as \nprovided in Section 13.2.1. \n13.2.1. Eligible Customers and Large Load. For the purpose of determining the \nability of an Eligible Customer to meet its obligations related to service \nusing the Participating TO’s Transmission Facilities hereunder, the \nParticipating TO shall require reasonable credit review procedures and \nfinancial security for the Eligible Customer. This review shall be made in \naccordance with standard commercial practices. In addition, the"},{"page":45,"startToken":17390,"endToken":17862,"text":"37 \nParticipating TO may require the Eligible Customer to provide and \nmaintain in effect during the term of the service, an unconditional and \nirrevocable letter of credit as security to meet its responsibilities and \nobligations under this TO Tariff, or an alternative form of security \nproposed by the Eligible Customer and acceptable to the Participating TO, \nand consistent with commercial practices established by the Uniform \nCommercial Code, that protect the Participating TO against the risk of \nnon-payment. The amount of financial security required will be provided \nin each applicant’s Cost Recovery Agreement. \n14. \nDisputes. Except as limited below or as otherwise limited by law, the ISO ADR \nProcedures shall apply to all disputes between parties which arise under this TO Tariff or \nunder or in respect of the proposed terms and conditions of a Facilities Study Agreement, \nSystem Impact Study Agreement or Expedited Service Agreement. The ISO ADR \nProcedures set forth in Section 13 of the ISO Tariff shall not apply to disputes as to \nwhether rates and charges set forth in this TO Tariff (other than charges for studies) are \njust and reasonable under the FPA. \n15. \n[Reserved] \n16. \nMiscellaneous. \n16.1. Notices. Any notice, demand, or request in accordance with this TO Tariff, unless \notherwise provided in this TO Tariff, shall be in writing and shall be deemed \nproperly served, given, or made: (i) upon delivery if delivered in person, (ii) five \ndays after deposit in the mail if sent by first class United States mail, postage \nprepaid, (iii) upon receipt of confirmation by return electronic facsimile if sent by \nfacsimile, or (iv) upon Party at the address set forth in Appendix II. Any Party \nmay at any time, by notice to the other Parties, change the designation or address \nof the person specified in Appendix II to receive notice on its behalf. \nAny notice of a routine character in connection with service under this TO Tariff \nor in connection with operation of facilities shall be given in such a manner as the \nParties may determine from time to time, unless otherwise provided in this TO \nTariff. \n16.2. Waiver. Any waiver at any time by any Party of its rights with respect to any \ndefault under this TO Tariff, or with respect to any other matter arising in \nconnection with this TO Tariff, shall not constitute or be deemed a waiver with \nrespect to any subsequent default or other matter arising in connection with this \nTO Tariff. Any delay short of the statutory period of limitations in asserting or \nenforcing any right shall not constitute or be deemed a waiver. \n16.3. Confidentiality. \n16.3.1. Maintaining Confidentiality If Not for Public Disclosure. The \nParticipating TO shall maintain the confidentiality of all of the documents, \ndata, and information provided to it by any other Party that such Party may"},{"page":46,"startToken":17862,"endToken":18343,"text":"38 \ndesignate as confidential, provided, however, that the information will not \nbe held confidential by the receiving Party if (1) the designating Party is \nrequired to provide such information for public disclosure pursuant to this \nTO Tariff or applicable regulatory requirements, or (2) the information \nbecomes available to the public on a non-confidential basis (other than \nfrom the receiving Party). \n16.3.2. Disclosure of Confidential Information. Notwithstanding anything in \nthis Section 16.3.2 to the contrary, if any Party is required by applicable \nlaws or regulations, or in the course of administrative or judicial \nproceedings, to disclose information that is otherwise required to be \nmaintained in confidence pursuant to this Section 16.3.2, the Party may \ndisclose such information; provided, however, that as soon as such Party \nlearns of the disclosure requirement and prior to making such disclosure, \nsuch Party shall notify the affected Party or Parties of the requirement and \nthe terms thereof. The affected Party or Parties may, at their sole \ndiscretion and own costs, direct any challenge to or defense against the \ndisclosure requirement and the disclosing Party shall cooperate with such \naffected Party or Parties to the maximum extent practicable to minimize \nthe disclosure of the information consistent with applicable law. The \ndisclosing Party shall cooperate with the affected Parties to obtain \nproprietary or confidential treatment of confidential information by the \nperson to whom such information is disclosed prior to any such disclosure. \n16.4. TO Tariff Supersedes Existing Tariffs. This TO Tariff, together with the ISO \nTariff and wholesale distribution access tariff, if any, supersedes any pre-existing \nopen access transmission tariff of the Participating TO. \n16.5. Titles. The captions and headings in this TO Tariff are inserted solely to facilitate \nreference and shall have no bearing upon the interpretation of any of the rates, \nterms, and conditions of this TO Tariff. \n16.6. Severability. If any term, covenant, or condition of this TO Tariff or the \napplication or effect of any such term, covenant, or condition is held invalid as to \nany person, entity, or circumstance, or is determined to be unjust, unreasonable, \nunlawful, imprudent, or otherwise not in the public interest, by any court or \ngovernment agency of competent jurisdiction, then such term, covenant, or \ncondition shall remain in force and effect to the maximum extent permitted by \nlaw, and all other terms, covenants, and conditions of this TO Tariff and their \napplication shall not be affected thereby but shall remain in force and effect. The \nParties shall be relieved of their obligations only to the extent necessary to \neliminate such regulatory or other determination, unless a court or governmental \nagency of competent jurisdiction holds that such provisions are not severable \nfrom all other provisions of this TO Tariff. \n16.7. Preservation of Obligations. Upon termination of this TO Tariff, all unsatisfied \nobligations of each Party shall be preserved until satisfied."},{"page":47,"startToken":18343,"endToken":18674,"text":"39 \n16.8. Governing Law. This TO Tariff shall be interpreted, governed by, and construed \nunder the laws of the State of California, without regard to the principles of \nconflict of laws thereof, or the laws of the United States, as applicable, as if \nexecuted and to be performed wholly within the State of California. \n16.9. Appendices Incorporated. The several appendices (inclusive of any \nattachments) to this TO Tariff, as may be revised from time to time, are attached \nto this TO Tariff and are incorporated by reference as if fully set forth herein. \n16.10. Conflict With ISO Tariff. If a Market Participant or Eligible Customer identifies \na conflict between the TO Tariff and the ISO Tariff, the Participating TO and the \nMarket Participant or Eligible Customer shall make good-faith efforts to resolve \nthe conflict. If the parties are unable to informally resolve that conflict, the Parties \nmay use the ISO ADR Procedures to resolve it as set forth in Section 14 of this \nTariff. \n16.11. Conflicting Operating Instructions. In the event a Market Participant or Eligible \nCustomer receives conflicting operating instructions from the ISO and one or \nmore Participating TO(s), if human safety would not knowingly be jeopardized \nnor electric facilities subject to damage while the Market Participant or Eligible \nCustomer seeks to reconcile the conflict with the appropriate ISO and \nParticipating TO employees before acting, the Market Participant or Eligible \nCustomer should attempt a reconciliation. Otherwise, the Market Participant or \nEligible Customer shall adhere to ISO Tariff provision 4.2 and follow the ISO’s \ninstructions. In no event shall a Market Participant or Eligible Customer be \nrequired to follow operating instructions from the ISO if following those \ninstructions would knowingly jeopardize human safety. \n16.12. Reliability Events. After a disturbance or other reliability event involving a \nLarge Load, any associated Eligible Customer, Large Load, Scheduling \nCoordinator, and Participating TO must comply with any ISO, Regional Entity, or \nReliability Coordinator data request related to the event."},{"page":48,"startToken":18674,"endToken":18816,"text":"40 \nAPPENDIX I \nTransmission Revenue Requirement and TRBAA \n \n1. The Transmission Revenue Requirement shall be $141,661,544 which is composed \nof a Base Transmission Revenue Requirement of $135,000,000 and a TRBAA of \npositive $6,661,544 \n \n2. The High Voltage Transmission Revenue Requirement shall be $129,741,142 which \nis composed of a Base Transmission Revenue Requirement for the High Voltage \nTransmission Facilities of $125,415,000 and a High Voltage TRBAA of positive \n$4,326,142. \n \n3. The Low Voltage Transmission Revenue Requirement shall be $11,920,403, which \nis composed of a Base Transmission Revenue Requirement for the Low Voltage \nTransmission Facilities of $9,585,000 and a Low Voltage TRBAA of positive \n$2,335,403. \n \n4. The TRBAA will be recalculated annually consistent with the ISO Tariff, \napproved by the FERC, and provided to the ISO."},{"page":49,"startToken":18816,"endToken":18923,"text":"41 \nAPPENDIX II \nNOTICES \n \nDesignated Representative: \n \nElizabeth Ramey \nSenior Attorney \nNextEra Energy, Inc.  \n801 Pennsylvania Avenue, NW \nSuite 220 \nWashington, DC 20004  \nTelephone: (202) 909-5696 \nElizabeth.Ramey@nexteraenergy.com  \n<mailto:Elizabeth.Ramey@nexteraenergy.com>  \n \nJaime Hoffmann \nPresident \nTrans Bay Cable LLC \n700 Universe Blvd. \nJuno Beach, FL 33408 \nJaime.Hoffmann@nexteraenergy.com \n<mailto: Jaime.Hoffmann@nexteraenergy.com> \n \n \nTrans Bay Cable LLC \n700 Universe Boulevard \nJuno Beach, Florida 33408 \nAttention: Business Management MailStop C5B/JBC \nEmail: NEET-Business-Management.SharedMailbox@nexteraenergy.com \n  \nWith a copy (which shall not constitute notice) to: \n  \nNextEra Energy Transmission, LLC \nAttn: Legal Department \n700 Universe Boulevard \nJuno Beach, Florida 33408 \nEmail: NEET-Legal.SharedMailbox@nexteraenergy.com"},{"page":50,"startToken":18923,"endToken":18930,"text":"ATTACHMENT A \n \nFORM OF COST RECOVERY AGREEMENT"},{"page":51,"startToken":18930,"endToken":19231,"text":"2 \nCOST RECOVERY AGREEMENT \n \nThis Cost Recovery Agreement (“Agreement”) is made and entered into as of __________ (the \n“Execution Date”) between  Trans Bay Cable LLC (“Trans Bay” or “Participating Transmission \nOwner”) and ________________, a [corporation/limited liability company/other] organized and \nexisting under the laws of the State/Commonwealth of _____________________ (the “Eligible \nCustomer”).  The Eligible Customer is requesting Interconnection service to serve a Large Load, \nas those terms are defined in the Participating Transmission Owner’s tariff. The Participating \nTransmission Owner and Eligible Customer may be referred to herein individually as a “Party” or \ncollectively as the “Parties.”  \n \nRECITALS \n \nWHEREAS, Participating Transmission Owner is a Non-Load-Serving Entity Participating \nTransmission Owner within the California Independent System Operator, Inc. (“CAISO”) \nBalancing Authority Area that does not provide retail electric service;  \n \nWHEREAS, Participating Transmission Owner owns the [Facility Name], which is under \nCAISO’s Operational Control and within the CAISO Controlled Grid; \n \nWHEREAS, Participating Transmission Owner’s Transmission Owner Tariff (the “Tariff”) \ncontrols the interconnection of load to [Facility Name], subject to compliance with the CAISO \ntariff; \n \nWHEREAS, Eligible Customer is requesting interconnection to Participating Transmission \nOwner’s [Facility Name] for the purpose of serving [describe Large Load requesting service, \nphysical location, and MW];  \n \nWHEREAS, the Parties have entered into this Agreement to establish the teams and conditions \nfor the Interconnection in order to enable the Eligible Customer to serve the Large Load  and for \nthe Participating Transmission Owner to fully recover from the Eligible Customer the costs \nassociated with serving the Large Load. \n \nNOW, THEREFORE, in exchange for good and valuable consideration of the premises and \nmutual covenants herein, the Parties agree as follows: \n \nARTICLE 1: DEFINITIONS \n \n1.1 \nDefinitions \n \nCapitalized terms used in this Agreement that are not otherwise defined herein shall have the \nmeaning provided in the Participating Transmission Owner Tariff, as may be amended from time-"},{"page":52,"startToken":19231,"endToken":19500,"text":"3 \nto-time.  In the event of a difference in a defined term between this Agreement and the definition \nin Module A of the Tariff, the defined term in this Agreement shall control. \n \n1.2 \nAnnual Required Revenue Commitment \n \nAnnual Required Revenue Commitment means the Eligible Customer’s Total Required Revenue \nCommitment divided by twenty (20) years. \n \n1.3 \nCost Recovery Payment \n \nCost Recovery Payment means the amount the Eligible Customer must pay in addition to the Large \nLoad Annual Received Revenue to meet its Annual Required Revenue Commitment. \n \n1.4 \nLarge Load Annual Received Revenue  \n  \nLarge Load Annual Received Revenue means revenue that is received by the Participating \nTransmission Owner from CAISO through the Access Charges during a specific calendar year and \nthat is directly attributable to the Eligible Customer’s Large Load. \n \n1.5 \nLarge Load Network Upgrade \n \nLarge Load Network Upgrade shall mean any Network Upgrade attributable to an Eligible \nCustomer interconnecting on behalf of a Large Load. Large Load Network Upgrades shall be \nspecified in the Eligible Customer’s applicable Interconnection Agreement. \n \n1.6 \nMonthly Cost Recovery Payment \n \nMonthly Cost Recovery Payment means the Cost Recovery Payment divided by twelve (12) \nmonths. \n \n1.7 \nTotal Required Revenue Commitment \n \nTotal Required Revenue Commitment means the incremental revenue requirement for any Large \nLoad Network Upgrade(s) to serve the Eligible Customer’s Large Load, calculated in accordance \nwith Section 3.2. \n \nARTICLE 2: EFFECTIVE DATE, TERM AND TERMINATION, FILING \n \n2.1 \nEffective Date \n \nThis Agreement shall be effective as of the date specified herein (“Effective Date”), subject to \nacceptance by FERC. If FERC accepts this Agreement subject to a different effective date,"},{"page":53,"startToken":19500,"endToken":19867,"text":"4 \nincluding in the event the Agreement is filed unexecuted, this Agreement shall become effective \non the date accepted by FERC. \n \n2.2 \nTerm and Termination \n \nUnless terminated earlier by mutual consent of the Parties, the term of this Agreement begins on \nthe Effective Date and shall continue for twenty (20) years after the final Large Load Network \nUpgrade goes in-service or until, as applicable, the Eligible Customer has satisfied its Total \nRequired Revenue Commitment in full pursuant to Article 3 hereof. \n \n2.3 \nFiling \n \nThe Participating Transmission Owner shall file this Agreement with FERC and/or the appropriate \nLocal Regulatory Authority, if applicable. Either Party may request that this Agreement be filed \nunexecuted at FERC. \n \nARTICLE 3: ELIGIBLE CUSTOMER PAYMENT OBLIGATIONS  \n \n3.1 \nPerformance Obligations \n \nThe Eligible Customer shall be responsible for the Total Required Revenue Commitment as stated \nin Exhibit A to this Agreement. The Eligible Customer shall be responsible for the timely payment \nof all applicable invoices assessed herein. This Agreement does not relieve Eligible Customer from \npaying any charges or amounts assessed by the CAISO or any other governmental or regulatory \nauthority to the Eligible Customer. \n \n3.2 \nTotal Required Revenue Commitment \n \n3.2.1 Calculation of Total Required Revenue Commitment \n \nThe Total Required Revenue Commitment shall be calculated consistent with FERC cost of service \nratemaking principles and set forth in Exhibit A of this Agreement, and as further set forth in \nSection 3.2.2, and shall incorporate a full return on the capital cost, depreciation, operations and \nmaintenance, and taxes of the Large Load Network Upgrade(s).   \n \n3.2.2 Initial and Adjusted Total Required Revenue Commitment \n \nThe initial Total Required Revenue Commitment will be based on the estimated costs of the Large \nLoad Network Upgrade(s) and shall be stated in Exhibit A to this Agreement. The Total Required \nRevenue Commitment shall be subject to adjustment by the Participating Transmission Owner to \nreflect the actual costs of the Large Load Network Upgrade(s).  Adjustments to the Total Required \nRevenue Commitment to reflect actual costs shall be initially calculated within one (1) year of the \nin-service date of the Large Load Network Upgrades and each year thereafter, and shall be reflected"},{"page":54,"startToken":19867,"endToken":20292,"text":"5 \nin Exhibit A of this Agreement with a true-up adjustment as a credit or charge and including \ninterest. Interest associated with any true-up adjustment will be determined in accordance with 18 \nC.F.R § 35.19a. \n \n3.3 \nRequired Cost Recovery Payments \n \nEach calendar year following the Large Load Network Upgrade’s in-service date and continuing \nthroughout the term of this Agreement, the Participating Transmission Owner shall:  \n \n(a) determine whether the Large Load Annual Received Revenue for that calendar year meets \nthe Annual Required Revenue Commitment; and, if not,  \n(b) calculate the Cost Recovery Payment, payable by the Eligible Customer, equal to the \ndifference between (i) the Annual Required Revenue Commitment for the applicable \ncalendar year and (ii) the Large Load Annual Received Revenue for that calendar year, plus \nany applicable interest calculated in accordance with 18 C.F.R § 35.19a.  \n \n3.4 \nInvoice for Monthly Cost Recovery Payments \n \nWithin thirty (30) days of the end of each month of any calendar year in which a Cost Recovery \nPayment is owed, the Participating Transmission Owner shall invoice the Eligible Customer for \nthe Monthly Cost Recovery Payment as determined under Article 8. The Eligible Customer shall \ntimely pay such invoice in accordance with Article 8. \n \n3.5 \nTreatment of Cost Recovery Payments  \n \nFor each calendar year during the Term of this Agreement, the Participating Transmission Owner \nshall treat any Cost Recovery Payments required to be paid by the Eligible Customer as a credit in \nthe next calculation of the Participating Transmission Owner’s Transmission Revenue \nRequirement in  Appendix I of its Tariff by deducting the Cost Recovery Payments from the \nTransmission Revenue Requirement, and shall include a workpaper  detailing such crediting and \nrate treatment in the filing at FERC implementing such calculation.  \n \n3.6 \nPayment in Event of Termination, Cancellation, or Withdrawal \n \nUpon termination, disconnection, suspension, or abandonment of the Large Load project, or should \nthe Eligible Customer terminate, cancel, or otherwise withdraw or terminate this Agreement, the \nInterconnection Agreement, or its Interconnection service for any reason, the Eligible Customer \nshall remain obligated to pay to the Participating Transmission Owner all costs incurred or \ncommitted by the Participating Transmission Owner associated with serving the Large Load, \nincluding Network Upgrades, prior to the effective date of any such termination or change. In the \nevent the Eligible Customer fails to make such payment, this Agreement shall not be Terminated \nuntil such payment is made and payments shall continue to be due under Article 3. The \nParticipating Transmission Owner may draw upon the Required Security to satisfy the Eligible"},{"page":55,"startToken":20292,"endToken":20707,"text":"6 \nCustomer’s obligations under this Agreement. This Section 3.6 is without prejudice to any other \nremedy available to the Participating Transmission Owner. \n \nARTICLE 4: Security Requirements \n \n4.1 \nRequired Security \n \nThe Eligible Customer shall provide and maintain financial security in accordance with this Article \n4 (the “Required Security”). The Required Security shall be in an amount equal to the Total \nRequired Revenue Commitment and shall take one of the following forms as reasonably acceptable \nto the Participating Transmission Owner:  \n \n(a) cash; \n(b) an irrevocable letter of credit issued by a commercial bank that has (i) an office, branch, or \nplace of business in the United States where claims can be presented, (ii) assets of at least \n$10 billion, and (iii) a Credit Rating of either “A3” or higher by Moody’s, or (b) “A-” or \nhigher by Standard & Poor’s (“S&P”). If a commercial bank is rated by each of Moody’s \nand S&P, the lower rating will be the applicable standard; \n(c) an irrevocable guaranty, provided that the guarantor maintain a senior unsecured credit \nrating of BBB- equivalent by Moody’s, S&P, or Fitch. If the guarantor is rated by one or \nmore rating agencies, the lowest rating will be the applicable standard; or \n(d) such other form of security as the Eligible Customer may propose and the Participating \nTransmission Owner, in its sole discretion, determines to be acceptable. \n \nWhen the amount of Total Required Revenue Commitment is adjusted per Section 3.2.2, the \namount of Required Security shall be adjusted accordingly. The amount of Required Security may \nbe further adjusted in accordance with Sections 4.3 and 4.4. \n \n4.2 \nTiming to Provide Required Security \n \nThe Eligible Customer shall provide the Required Security within thirty (30) Calendar Days of the \nlater of (i) the execution of this Agreement by all parties or (ii) acceptance of this Agreement by \nFERC. Failure to provide the Required Security within such timeframe will result in the Large \nLoad Interconnection Application being deemed withdrawn. \n \n4.3 \nAnnual Reduction of Required Security \n \nThe Required Security shall remain with the Participating Transmission Owner for the Term of \nthis Agreement. The Participating Transmission Owner will reduce the Required Security \nfollowing each Annual Update during the Term of this Agreement to reflect the completed \npayments made by the Eligible Customer pursuant to Article 3 of this Agreement. Any such \nreduced Required Security must be provided in a revised form of irrevocable security otherwise \nmeeting the requirements of Section 4.1."},{"page":56,"startToken":20707,"endToken":21110,"text":"7 \n \n4.4 \nUse of Required Security by Participating Transmission Owner \n \nIn the event Eligible Customer fails to timely pay any invoice or any other payment due under this \nAgreement, the Participating Transmission Owner shall notify the Eligible Customer in accordance \nwith Section 13.4. If the Eligible Customer fails to timely cure and provide such payment within \nfive (5) Business Days of receiving such notice, the Participating Transmission Owner shall be \nentitled to draw on the Required Security in the amount of the missed payment, as well as any \naccrued interest charges based on FERC’s regulations at 18 C.F.R § 35.19a. Within twenty (20) \nBusiness Days of such draw on the Required Security occurring, the Eligible Customer shall be \nrequired to provide the Participating Transmission Owner with sufficient irrevocable security to \nmaintain sufficient Required Security to meet the obligation under Section 4.1 of this Agreement. \n \n4.5 \nTerm of Required Security \n \nRequired Security shall remain in place until the termination of this Agreement. Any Required \nSecurity provided by Eligible Customer must be kept active, must continue to meet this Article 4’s \nrequirements, and must be available to the Participating Transmission Owner in the event that \nEligible Customer fails to make any payment required under this Agreement.  Any fees or costs \nassociated with the provision of the Required Security under this Agreement are the sole \nresponsibility of the Eligible Customer. \n \nARTICLE 5: [RESERVED] \n \nARTICLE 6: [RESERVED] \n \nARTICLE 7: CONFIDENTIALITY \n \n7.1 \nConfidentiality \n \nDuring the term of this Agreement and for a period of five (5) years after any termination or \nexpiration of this Agreement, each Party shall hold in confidence and not disclose to any person \nany Confidential Information received by a Party (“Receiving Party”) from the other party \n(“Disclosing Party”), and except as Disclosing Party may authorize in writing, a Receiving Party \nwho received Confidential Information shall and shall cause its Representatives to: treat and cause \nto be treated as confidential all Confidential Information; not disclose any Confidential \nInformation to any third party (other than its Representatives) or make available any reports, \nrecommendations, extracts, summaries, analysis, or conclusions based on the Confidential \nInformation; use or grant access to Confidential Information only in connection with the \nperformance of the respective obligations as provided under this Agreement; or make copies of any \ntangible embodiment of Confidential Information only as necessary for the performance of \nrespective obligations as provided under this Agreement."},{"page":57,"startToken":21110,"endToken":21500,"text":"8 \n7.2 \nScope \n \nConfidential Information shall include, without limitation, all information relating to a Party’s \ntechnology, research and development, business affairs, and pricing, and any information supplied \nby a Party to another Party prior to the execution of this Agreement. Information is Confidential \nInformation only if it is clearly designated or marked in writing as confidential on the face of the \ndocument, or, if the information is conveyed orally or by inspection, if the Party providing the \ninformation orally informs the Party receiving the information that the information is confidential. \nThe Parties shall maintain as confidential any information that is provided and identified by a Party \nas Critical Energy/Electric Infrastructure Information (“CEII”), as that term is defined in 18 C.F.R. \n§ 388.113(c).  Such confidentiality will be maintained in accordance with this Article 7. If \nrequested by the receiving Party, the disclosing Party shall provide in writing, the basis for \nasserting that the information referred to in this Article warrants confidential treatment, and the \nrequesting Party may disclose such writing to the appropriate Governmental Authority. Each Party \nshall be responsible for the costs associated with affording confidential treatment to its \ninformation. Confidential Information shall not include information that the receiving Party can \ndemonstrate:   \n \n(a) \nis generally available to the public other than that which is a result of a disclosure by the \nReceiving Party; \n \n(b) \nwas in the lawful possession of the Receiving Party on a non-confidential basis before \nreceiving it from the Disclosing Party; \n \n(c) \nwas supplied to the Receiving Party without restriction by a third party, who, to the \nknowledge of the Receiving Party, after due inquiry, was under no obligation to the \nDisclosing Party to keep such information confidential; \n \n(d) \nwas independently developed by the Receiving Party without reference to Confidential \nInformation of the Disclosing Party; \n \n(e) \nis, or becomes, publicly known, through no wrongful act or omission of the Receiving \nParty or breach of this Agreement; or \n \n(f) \nis required to be disclosed by any Governmental Authority or is otherwise required to be \ndisclosed by law or subpoena or is necessary in any legal proceeding establishing rights \nand obligations under this Agreement. \n \nInformation designated as Confidential Information shall no longer be deemed confidential if the \nParty that designated the information as confidential notifies the other Party that it no longer is \nconfidential."},{"page":58,"startToken":21500,"endToken":21882,"text":"9 \n7.4 \nRelease of Confidential Information \n \nNo Party shall disclose Confidential Information to any other person, except to its Representatives \n(limited by FERC’s Standards of Conduct requirements) without the prior written consent of the \ndisclosing Party.  A receiving Party may disclose Confidential Information to its Representatives \nprovided that such Representatives have first been advised of the confidentiality provisions of this \nArticle 7.  Notwithstanding the foregoing, a Party providing Confidential Information to a \nRepresentative shall remain primarily responsible for any release of Confidential Information by \nsuch Representative in contravention of this Article 7. \n \n7.5 \nRights \n \nEach Party retains all rights, title, and interest in the Confidential Information that it discloses to \nthe other Party.  A Party’s disclosure to the other Party of Confidential Information shall not be \ndeemed a waiver by such Party or any other person or entity of the right to protect the Confidential \nInformation from public disclosure. \n \n7.6 \nNo Warranties \n \nBy providing Confidential Information, neither Party makes any warranties or representations as \nto its accuracy or completeness. \n \n7.7 \nStandard of Care \n \nEach Party shall use at least the same standard of care to protect Confidential Information it \nreceives as such Party uses to protect its own Confidential Information from unauthorized \ndisclosure, publication or dissemination.  Confidential Information may be used solely to fulfill a \nParty’s obligations to the other Party under this Agreement or to comply with Applicable Laws, \nRegulations, and Standards. \n \n7.8 \nOrder of Disclosure \n \nIf a Governmental Authority with the right, power, and apparent authority to do so requests or \nrequires a Party, by subpoena, oral deposition, interrogatories, requests for production of \ndocuments, administrative order, or otherwise, to disclose Confidential Information, that Party \nshall provide the Party that provided the Confidential Information with prompt notice of such \nrequest(s) or requirement(s) so that the providing Party may seek an appropriate protective order \nor waive compliance with the terms of this Agreement.  Notwithstanding the absence of a \nprotective order or agreement, or waiver, the Party that is subjected to the request or order may \ndisclose such Confidential Information which, in the opinion of its counsel, the Party is legally \ncompelled to disclose.  Each Party shall use reasonable efforts to obtain reliable assurance that \nconfidential treatment will be accorded to any Confidential Information so furnished."},{"page":59,"startToken":21882,"endToken":22413,"text":"10 \n7.9 \nReturn or Destruction of Confidential Information \n \nEach Party shall, within ten (10) Business Days of receipt of a written request from the other Party, \nuse reasonable efforts to destroy, erase, or delete (with such destruction, erasure and deletion \ncertified in writing to the requesting Party) or to return to the requesting Party, without retaining \ncopies thereof, any and all written or electronic Confidential Information received from the \nrequesting Party, provided that (i) the non-requesting Party shall not be required to purge any \nhistorical backup media, and (ii) if the non-requesting Party elects to delete, destroy or erase all \nsuch Confidential Information, it shall certify such deletion, destruction, or erasure to the \nrequesting Party in writing. \n \n7.10 \nRemedies \n \nMonetary damages would be inadequate to compensate a Party for the other Party’s Breach of its \nobligations under this Article 7; therefore, a Party shall be entitled to injunctive or other equitable \nrelief, without bond or proof of damages, if the other Party Breaches or threatens to Breach its \nobligations under this Article 7, and the Party that Breaches or threatens to Breach its obligations \nunder this Article 7 shall not plead in defense that there would be an adequate remedy at law.  \nInjunctive relief shall not be deemed to be an exclusive remedy for the Breach of this Article 7 and \nshall be in addition to all other remedies available at law or in equity.  The covenants contained \nherein are necessary for the protection of legitimate business interests and are reasonable in scope. \n \n7.11 \nDisclosure to Federal or State Commissions or their Staff \n \nNotwithstanding anything in this Article 7 to the contrary, and pursuant to 18 C.F.R. § 1b.20, if \nFERC or its staff, during the course of an investigation or otherwise, requests information from a \nParty that is otherwise required to be maintained in confidence pursuant to this Agreement, such \nParty shall provide the requested information to FERC or its staff, within the time provided for in \nthe request for information.  In providing the information to FERC or its staff, the Party must, \nconsistent with 18 C.F.R. § 388.112, request that the information be treated as confidential and \nnon-public by FERC and its staff and that the information be withheld from public disclosure.  To \nthe extent permitted by law, each Party shall notify the other Party prior to the release of the other \nParty’s Confidential Information to FERC or its staff.  A Party shall promptly notify the other Party \nwhen it is notified by FERC or its staff that a request to release the other Party’s Confidential \nInformation has been received by FERC, at which time either of the Parties may respond before \nsuch information would be made public, pursuant to 18 C.F.R. § 388.112. \n \n7.12 \nGeneral Disclosure \n \nNotwithstanding any other provisions of this Article 7, a Party may disclose the Confidential \nInformation provided by the other Party to the extent disclosure is:  (i) reasonably deemed by the \ndisclosing Party to be required in connection with a dispute between the Parties, or the defense of \nlitigation or dispute; (ii) otherwise permitted by written consent of the Party that provided such"},{"page":60,"startToken":22413,"endToken":22879,"text":"11 \nConfidential Information; (iii) necessary to fulfill its obligations to an RTO or ISO or to a regional \nor national reliability organization; or (iv) is required to be disclosed pursuant to any Governmental \nAuthority or is otherwise required to be disclosed by law or subpoena.  Prior to any disclosures of \nanother Party’s Confidential Information under this Section 7.12, the Disclosing Party shall \npromptly notify the other Party in writing and shall assert confidentiality and cooperate with the \nother Party in seeking to protect the Confidential Information from public disclosure by \nconfidentiality agreement, protective order, or other reasonable measures. \n \n7.13 \nAudit Rights \n \nSubject to the requirements of confidentiality under Article 7 of this Agreement, (1) the accounts \nand records related to the adjustment provided for in Section 3.2.2 shall be subject to audit for a \nperiod of twenty-four (24) months following the date the adjustment; and (2) the accounts and \nrecords related to the determination of whether the Eligible Customer satisfied its Annual Required \nRevenue Commitment shall be subject to audit for a period of twelve (12) months following each \nyear’s determination in accordance with this Article 7.  Eligible Customer at its expense shall have \nthe right, during normal business hours, and upon prior reasonable notice to the other Parties, to \naudit such accounts and records. Any audit authorized by this Article 7 shall be performed at the \noffices where such accounts and records are maintained and shall be limited to those portions of \nsuch accounts and records that relate to obligations under this Agreement. \n \nARTICLE 8: INVOICING AND PAYMENT; TAXES \n \n8.1 \nPurpose of Invoicing \n \nAny invoice that is issued pursuant to this Agreement shall be for the purposes set forth in this \nAgreement.   \n \n8.2 \nTimeliness of Payment \n \nUnless otherwise agreed upon, any invoices issued pursuant to this Agreement shall be rendered \nwithin thirty (30) Calendar Days of the end of  the calendar month in which expenses were incurred \nand shall be due and payable, unless otherwise agreed upon, within thirty (30) Calendar Days of \nreceipt of such invoice.  Payment shall be made by electronic transfer or such other means as shall \ncause such payment to be available for the use of the payee.  Interest on unpaid amounts shall be \ndetermined based on FERC’s regulations at 18 C.F.R § 35.19a. \n \n8.3 \nDisputed Invoices \n \nIn the event that a Party disputes an invoice, the disputing Party shall pay the invoice in full in \naccordance with Section 8.2 of this Agreement, subject to the refund of any amounts found to have \nbeen incorrectly invoiced plus interest on such amount from the date of payment to the date of the \nrefund at the rate stated in Section 8.2.  In the event of a billing dispute, the disputing Party shall"},{"page":61,"startToken":22879,"endToken":23352,"text":"12 \nprovide written notice of the dispute to the billing Party as set out in Section 13.4.  In response to \nthe notice, the billing Party will promptly provide all documentation that is reasonably required in \nsupport of its bill and confer with the disputing Party.  If these good faith efforts fail to resolve the \nissue, the matter may, by mutual agreement of the Parties, be settled through the dispute resolution \nprocess described in Article 10.   \n \n8.4 \nInvoice Adjustments \n \nOther than as required by law, regulatory action or metering test adjustments, invoice adjustments \nshall be made within six (6) months of the rendition of the initial invoice. \n \n8.5 \nTax Reimbursement \n \nIf, as part of any compensation to be paid under this Agreement, any transaction tax, including, \nbut not limited to sales, excise, or similar taxes (other than taxes based on or measured by net \nincome) is levied and/or assessed against either Party by any taxing authority on the power and/or \nenergy manufactured, generated, produced, converted, sold, purchased, transmitted, interchanged, \nexchanged, exported or imported by the supplying Party to the other Party, then such supplying \nParty shall be fully compensated by the other Party for such direct taxes. \n \nARTICLE 9: INDEMNITY \n \nTo the extent permitted by law, each Party (the “Indemnifying Party”) shall indemnify, save \nharmless, and defend the other Party from and against any losses, liabilities, costs, expenses, suits, \nactions, claims, and all other obligations arising out of injuries or death to persons or damage to \nproperty (each a “Loss” and each suffered by or asserted by a third party) arising out of, in \nconnection with, or resulting from the Indemnifying Party’s (or its Contractor’s) performance or \nnon-performance of its obligations under this Agreement; provided, however, that a Party’s \nobligation to indemnify the other Party shall not apply to any Losses arising from the other Party’s \nnegligence or intentional misconduct.  Promptly after receipt by a Party entitled to indemnity \n(“Indemnified Party”) of any claim or notice of the commencement of any action, administrative \nor legal proceeding, or investigation as to which the indemnity provided for in this Article 9 may \napply, the Indemnified Party shall notify the Indemnifying Party of such fact.  Any failure of or \ndelay in such notification shall not affect an Indemnifying Party’s indemnification obligation \nunless such failure or delay is materially prejudicial to the Indemnifying Party. \n \nThe Indemnifying Party shall, at the Indemnified Party’s option and at the Indemnifying Party’s \nexpense, defend the Indemnified Party against any and all suits, actions, or claims arising out of, \nconnected with, or resulting from the performance or non-performance by the Indemnifying Party \nor any of its Contractors of its obligations under this Agreement.  The Indemnifying Party shall \nnot settle or make a plea with respect to any suit, action or claim without the Indemnified Party’s \nprior written consent."},{"page":62,"startToken":23352,"endToken":23837,"text":"13 \nA Party’s obligations to another Party under this Article 9 shall not be limited in any way by any \nprovision of any workers’ compensation, disability benefits, payroll, or other employee benefits \nlaws; provided, however, that nothing herein shall limit or restrict any defense a Party may be \nentitled to assert with respect to a Loss, including a defense based on the status of such Party as a \nstatutory employer.  EACH PARTY HEREBY SPECIFICALLY AND EXPRESSLY WAIVES \nANY AND ALL DEFENSES IT MAY HAVE TO AN INDEMNIFICATION OBLIGATION TO \nTHE OTHER PARTY PURSUANT TO THIS AGREEMENT BASED ON ANY IMMUNITY TO \nWHICH SUCH PARTY MAY BE ENTITLED UNDER ANY WORKERS’ COMPENSATION, \nDISABILITY BENEFITS, PAYROLL, OR EMPLOYEE BENEFITS LAWS. \n \nFor the purposes of this Article 9 only, the term “Party” shall include the Party’s Affiliates and the \ndirectors, officers, employees, and agents of the Party and its Affiliates. \n \nARTICLE 10: DISPUTES \n \n10.1 \nDispute Resolution \n \nThe Parties shall attempt, in good faith, to resolve or cure any dispute, controversy or claim (a \n“Dispute”) before initiating any formal legal action at law or in equity to resolve the same. If either \nParty believes that a Dispute has arisen, such Party shall give written notice thereof to the other \nParty, which notice shall describe in reasonable detail the basis and specifics of the claimed Dispute \n(the “Dispute Notice”). Within five (5) Business Days after delivery of the Dispute Notice, each \nParty shall appoint a senior level executive.  Each designated executive shall meet (in person or \nvia telephone) to discuss and attempt to resolve or cure such Dispute.  \n \nEach senior level executive shall negotiate for a reasonable period of time to settle the Dispute \nafter the Dispute Notice is referred to them; provided that such reasonable period shall not, unless \notherwise agreed by the Parties in writing, exceed twenty (20) Business Days from the time of \nreceipt of the Dispute Notice by the senior level executive of each Party, or longer period of time \nif agreed to by the Parties.  Notwithstanding anything to the contrary herein, in no event will the \nexecutive officer to whom the matter is referred be a person who is an attorney without the express \nwritten permission of the chief legal counsel of the other Party. \n \nIf the Dispute has not been resolved pursuant to this Section 10.1 within thirty (30) Business Days \nfrom the time of receipt of the Dispute Notice by the applicable individual, either Party may \nproceed to take any and all actions available to it under this Agreement to resolve such dispute and \nto obtain any remedies available under this Agreement. \n \n10.2 \nNot Usable as Evidence \n \nNothing said or disclosed, nor any document produced, in the course of any negotiations, \nconferences and discussion in connection with efforts to settle a Dispute that is not otherwise \nindependently discoverable shall be offered or received as evidence or used for impeachment or"},{"page":63,"startToken":23837,"endToken":24245,"text":"14 \nfor any other purposes in any suit, but shall be considered to have been disclosed for settlement \npurposes. \n \nARTICLE 11: BREACH AND DEFAULT \n \n11.1 \nGeneral \n \nA Party shall be considered in default of this Agreement (“Default”) if it fails to cure a Breach in \naccordance with the terms of this Section 11.1.  A breach (“Breach”) shall mean the failure of a \nParty to perform or observe any material term or condition of this Agreement; provided that no \nBreach shall exist where such failure to discharge an obligation (other than the payment of money) \nis the result of Force Majeure as defined in this Agreement or the result of an act or omission by \nthe other Party. Upon a Breach, the non-breaching Party shall give written notice of such Breach \nto the breaching Party.  The breaching Party shall have thirty (30) Calendar Days from receipt of \nthe Breach notice within which to cure such Breach; provided however, if such Breach is not \ncapable of cure within thirty (30) Calendar Days, the breaching Party shall commence such cure \nwithin thirty (30) Calendar Days after notice and continuously and diligently complete such cure \nwithin ninety (90) Calendar Days from receipt of the Breach notice; and, if cured within such time, \nthe Breach specified in such notice shall cease to exist. \n \n11.2 \nConsequence of Default \n \nIn the event of Default, Eligible Customer shall promptly pay any remaining Total Required \nRevenue Commitment owed under this Agreement.  In the event that Eligible Customer does not \npromptly such amount, the Participating Transmission Owner may draw on the Required Security. \nThis payment or draw on the Required Security does not limit any and all rights and remedies \navailable to the non-defaulting Parties allowed by law with respect to such default or collecting all \namounts owed under this Agreement. The Defaulting Party shall indemnify non-Defaulting Parties \nfor reasonable costs, attorney fees and/or expenses incurred with respect to a default or collecting \nall amounts owed, including, as applicable, any tax gross-up obligations under this Agreement. \n \nARTICLE 12: GOVERNMENTAL AUTHORITIES; AMENDMENT \n \n12.1 \nGovernmental Authorities \n \nThis Agreement is made subject to the jurisdiction of FERC and any Local Regulatory Authority \nhaving jurisdiction over the rates, terms and conditions, or services provided under this Agreement. \nNothing in this Agreement shall limit the rights of the Parties or of FERC under sections 205 and \n206 of the Federal Power Act and FERC’s rules and regulations thereunder."},{"page":64,"startToken":24245,"endToken":24723,"text":"15 \n12.2 \nAmendments to the Agreement \n \nThis Agreement may only be modified in a writing signed by the Parties.  In the event that the \nParties agree to amend this Agreement, the Parties shall, if required by Applicable Laws, \nRegulations, and Standards, file any such amendment or modification with FERC. \n \nARTICLE 13: GENERAL \n \n13.1 \nForce Majeure \n \nNo Party shall be in Breach in respect to any obligation hereunder because of Force Majeure.  if \nany Party’s performance under this Agreement is hindered by an event of Force Majeure, it shall \nmake all reasonable efforts to perform its obligations under this Agreement. An event of Force \nMajeure means any act of God, labor disturbance, act of the public enemy, war, act of terrorism, \ninsurrection, riot, fire, storm or flood, explosion, breakage or accident to machinery or equipment, \norder, regulation or restriction imposed by governmental military or lawfully established civilian \nauthorities, or any other cause beyond a Party’s control. Force Majeure does not include an act of \nnegligence or intentional wrongdoing by the Party claiming Force Majeure or economic hardship \nor economic conditions rendering a Party’s performance of this Agreement unprofitable or \nuneconomic.  Any Party’s obligation to make payments or maintain the Required Security at all \ntimes shall not be suspended by Force Majeure.  A Party unable to fulfill any other obligation by \nreason of Force Majeure shall provide prompt written notice of such Force Majeure event to the \nother Party and such notice shall include an estimate of the expected duration of such event.  The \nfailure of a Party to perform its obligations under this Agreement as a result of Force Majeure shall \nonly be excused for the duration of the Force Majeure and while such Party exercises diligence to \nremove such disability.  As soon as the non-performing Party is able to resume performance of its \nobligations, such Party shall resume performance and give prompt notice thereof to the other Party.  \n \n13.2 \nWaivers \n \nNo failure or delay on the part of either Party in exercising any of its rights under this Agreement, \nno partial exercise by either Party of any of its rights under this Agreement, and no course of \ndealing between the Parties shall constitute a waiver of the rights of either Party under this \nAgreement.  Any waiver shall be effective only by a written instrument signed by the Party \ngranting such waiver, and such shall not operate as a waiver of, or continuing waiver with respect \nto, any subsequent failure to comply therewith. \n \n13.3 \nLiability \n \nTo the fullest extent permitted by law and notwithstanding any provision of this Agreement, in no \nevent shall a Party, its Affiliates, or any of their respective owners, officers, directors, employees, \nagents, successors or assigns be liable to the other Party, its Affiliates or any of their respective \nowners, officers, directors, employees, agents, successors or assigns, whether in contract, warranty,"},{"page":65,"startToken":24723,"endToken":25021,"text":"16 \ntort, negligence, strict liability, or otherwise, for any special, indirect, incidental, exemplary, \nconsequential (including, without limitation, attorneys’ fees, litigation costs, replacement power \ncosts, lost profits or revenues, loss of good will or lost business opportunities), or punitive damages \nrelated to or resulting from performance or nonperformance of this Agreement or any activity \nassociated with or arising out of this Agreement. \n \n13.4 \nWritten Notices \n \nAny notice or other communication required or permitted by this Agreement may be given by \npersonal delivery, by e-mail (with confirmation of receipt), by any courier service which \nguarantees overnight, receipted delivery, or by U.S. certified or registered mail, return receipt \nrequested, addressed to the Party entitled thereto, at the following addresses.  The below listed \ntitles and addresses for a Party may be changed by written notice to all the other Parties. Such \nchange shall not necessitate a filing under Section 205 of the Federal Power Act. Any such notice \nor communication will be deemed to have been given as of the date received. \n \nIf to Trans Bay \nCable LLC: \nTrans Bay Cable LLC \n700 Universe Boulevard \nJuno Beach, Florida 33408 \nNEET-Business-Management.SharedMailbox@nexteraenergy.com \n \nWith a copy (which shall not constitute notice) to: \n \nTrans Bay Cable LLC \nAttn: Legal Department \n700 Universe Boulevard \nJuno Beach, Florida 33408 \nNEET-Legal.SharedMailbox@nexteraenergy.com  \n \nIf to [Eligible \nCustomer]: \n[Eligible Customer to insert] \n \n \n \n \n13.5 \nGoverning Law \n \nThe validity and meaning of this Agreement shall be governed by and construed in accordance \nwith federal law where applicable and, when not in conflict with or preempted by federal law, the \napplicable law of the State of California, without application of its conflicts of law provisions. \n \n13.6 \nCounterparts \n \nThis Agreement may be executed in one or more counterparts, each of which shall be deemed an \noriginal."},{"page":66,"startToken":25021,"endToken":25448,"text":"17 \n13.7 \nEntire Agreement; Superseding Effect \n \nThis Agreement, including all exhibits, schedules, appendices and other attachments hereto, sets \nforth the entire understanding and agreement of the Parties as to the subject matter of this \nAgreement, cost recovery by the Participating Transmission Owner of all costs of Large Load \nNetwork Upgrades under the applicable Interconnection Agreement, and supersedes all prior \nwritten and oral understandings, offers, agreements, commitments, representations, writings, \ndiscussions, or other communications of every kind between the Parties, pertaining to the subject \nmatter hereof. \n \nARTICLE 14: ASSIGNMENT \n \n14.1 \nAssignment \n \nThis Agreement shall inure to the benefit of and be binding upon the successors and assigns of the \nParties.  This Agreement shall not be assigned by any Party without the written consent of the other \nParty, which consent shall not be unreasonably withheld, conditioned, or delayed; provided that \nthe assignee is at least as creditworthy as the assigning Party and the assignee of Eligible Customer \nshall provide Participating Transmission Owner with valid Security as contemplated herein. No \npurported assignment of this Agreement shall release or discharge any Party from current or future \nobligations hereunder unless all such obligations are assumed by the successor or assignee of that \nParty in writing and in conformity with this provision. \n \nARTICLE 15: SURVIVAL \n \n15.1 \nSurvival \n \nThe termination of this Agreement shall not discharge either Party from any obligation it owes to \nthe other Party under this Agreement by reason of any transaction, loss, cost, damage, expense, or \nliability that shall occur (or the circumstances, events or basis of which shall occur or arise) prior \nto such termination, including but not limited to any accrued payment obligations, final cost \nreconciliation, ownership of the Network Upgrades or Interconnection Facilities, or provisions that \nexpressly or by their nature survive the termination or expiration of this Agreement.  It is the intent \nof the Parties hereby that any such obligation owed (whether the same shall be known or unknown \nat the termination of this Agreement) shall survive the termination of this Agreement, and that \neither Party may enforce its rights against the other Party with respect to such obligations in an \naction at law or in equity to the fullest extent permitted by law. \n \nThis Agreement shall continue in effect after termination to the extent necessary:  (i) for final \nbillings and payments; (ii) to permit the determination and enforcement of liability and \nindemnification obligations arising from acts or events that occurred while this Agreement was in \neffect; and (iii) to permit each Party to have access to the real property, including but not limited"},{"page":67,"startToken":25448,"endToken":25487,"text":"18 \nto leased property and easements of the other Party to disconnect, remove or salvage its own \nfacilities and equipment. \n \n[The remainder of this page is intentionally left blank. The next \npage of this document is the signature page.]"},{"page":68,"startToken":25487,"endToken":25526,"text":"19 \nIN WITNESS WHEREOF, the Parties have caused their authorized representatives to execute \nthis agreement as of the date first above written. \n \n \nTRANS BAY CABLE LLC \n \nBy:  \n \n \n \n \n \n \n \n \n \nName:  \n \n \n \n \n \n \n \nTitle:   \n \n \n \n \n \n \n \n \n \n \n[ELIGIBLE CUSTOMER] \n \nBy:  \n \n \n \n \n \n \n \n \n \nName:  \n \n \n \n \n \n \n \nTitle:   \n \n[ENTITY NAME] \n \nBy:  \n \n \n \n \n \n \n \n \n \nName:  \n \n \n \n \n \n \n \nTitle:"},{"page":69,"startToken":25526,"endToken":25560,"text":"20 \nEXHIBIT A \nInitial Total and Annual Required Revenue Commitment \n \nEstimated costs of the Large Load Network Upgrade(s) stated in the Interconnection Agreement: \n$ \n \n \n. \n \nInitial Total Required Revenue Commitment: $ \n \n \n  . \n \nInitial Annual Required Revenue Commitment: $ \n \n \n  ."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":4,"endAt":4,"startToken":0,"endToken":63},{"p":4,"at":4,"title":"TABLE OF CONTENTS","method":"printed heading","endPage":8,"endAt":4,"startToken":63,"endToken":1138},{"p":8,"at":4,"title":"Attachment A - Cost Recovery Agreement","method":"printed heading","endPage":50,"endAt":0,"startToken":1138,"endToken":18923},{"p":50,"at":0,"title":"ATTACHMENT A","method":"printed heading","endPage":69,"endAt":289,"startToken":18923,"endToken":25560}]}