{"document":{"slug":"rec-20261116-5348","title":"Trans Bay Cable - Respsonse to Show Cause Order EL26-71-","issued":"2026-11-16","accession":"20261116-5348","docket":"ER27-535-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Trans Bay Cable LLC","kind":"tariff filing","file":"sources/filings/text/20261116-5348_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5348","tier":"record","sha256":"4cd8850d11b3338d89ebda9646386ff60eb4dbd1685c109318729d694ed2c348","pages":25,"tokens":10950,"emptyPages":[],"textThemes":["study","cost","colo","credit"]},"pages":[{"page":1,"startToken":0,"endToken":347,"text":"2000 Pennsylvania Avenue NW \nSuite 6000 \nWashington, DC 20006 \n202-298-1800 \n \nMeghan O’Brien \n202-298-1800 \nmobrien@vnf.com \n \n \nNovember 16, 2026 \n \nVIA E-TARIFF FILING \n \nDebbie-Anne A. Reese \nSecretary \nFederal Energy Regulatory Commission \n888 First Street, NE  \nWashington, DC 20426 \n \n \nRe: \nTrans Bay Cable LLC \n \n \nDocket Nos. ER27-___-000 and EL26-71-000 \n \n \nResponse to Show Cause Order \n \nDear Secretary Reese: \n \n \nPursuant to section 205 of the Federal Power Act (“FPA”),1 Part 35 of the Federal Energy \nRegulatory Commission’s (the “Commission”) regulations and Rules 209 and 213 of the \nCommission’s Rules of Practice and Procedure,2 Trans Bay Cable LLC (“Trans Bay”) \nrespectfully submits this response to the Commission’s Show Cause Order issued pursuant to \nsection 206 of the FPA on June 18, 2026, in Docket No. EL26-71-000 directing the California \nIndependent System Operator Corporation (“CAISO”) and Participating Transmission Owners \n(“PTOs”) in CAISO to show cause why their tariffs are just and reasonable and not unduly \ndiscriminatory or preferential, or in the alternative to explain the necessary changes to remedy \nthe Commission’s identified concerns.3  In the Show Cause Order, the Commission also \nencouraged a response in the form of a section 205 filing proposing tariff revisions remedying \nthe concerns identified in the Show Cause Order.4  \n \nIn the instant filing, Trans Bay proposes revisions to its Transmission Owner Tariff \n(“Trans Bay Tariff”)5 and supporting explanations in response to the Show Cause Order to \nremedy the concerns identified therein.  Trans Bay’s proposed tariff revisions are just and \nreasonable and not unduly discriminatory or preferential, and resolve the Commission’s \napplicable preliminary findings in the Show Cause Order.  Trans Bay also explains how certain \n \n1  \n16 U.S.C. § 824d. \n2  \n18 C.F.R. §§ 385.209, 385.213(a). \n3  \nCal. Indep. Sys. Operator Corp., 195 FERC ¶ 61,214, at P 3 (2026) (“Show Cause Order”). \n4  \nId. at P 34. \n5  \nThe Trans Bay Tariff has been accepted by the Commission.  Trans Bay Cable LLC, 129 FERC ¶ 61,225 \n(2009); Trans Bay Cable LLC, Docket No. ER11-3262-002 (Sep. 7, 2011); Trans Bay Cable LLC, Docket No. \nER11-3262-004 (Nov. 23, 2011)."},{"page":2,"startToken":347,"endToken":812,"text":"2 \naspects of the Show Cause Order are not applicable to Trans Bay due to its role as a Non-Load-\nServing Entity PTO (“Non-LSE PTO”).6  Thus, Trans Bay requests that the show cause \nproceeding be terminated with respect to Trans Bay.  \nFurther, Trans Bay respectfully requests a 30-day comment period on this filing.  Trans \nBay also respectfully requests that the Commission accept the amendments proposed herein \neffective February 16, 2027. The requested dates align with those requested by CAISO.  \nI. \nBACKGROUND  \nA. \nTrans Bay \nTrans Bay is a Non-LSE PTO in the CAISO region. Trans Bay is a public utility and \nsubsidiary of NextEra Energy Transmission, LLC, that owns and operates a 53-mile, \napproximately 400 MW high-voltage direct current (“HVDC”) submarine transmission line \nburied at various depths beneath the San Francisco Bay, with AC/DC converter stations at each \nend (the “Trans Bay Cable”). The Trans Bay Cable provides direct electric transmission between \nthe Pacific Gas & Electric Company (“PG&E”) Pittsburg Substation, located at a site adjacent to \nthe City of Pittsburg, California, and PG&E’s Potrero Substation, located within the City of San \nFrancisco. The Trans Bay Cable commenced commercial operation on November 23, 2010, and \nwas simultaneously turned over to the operational control of the California Independent System \nOperator Corporation (“CAISO”). \n \n \nTrans Bay’s FPA-jurisdictional facilities consist of the Trans Bay Cable, as well as its \nCAISO Transmission Owner Tariff, rate schedules, and contracts on file with the Commission \nand related books and records. Trans Bay does not own or operate any generation or distribution \nfacilities, nor does it engage in the sale or brokering of energy or ancillary services. Trans Bay \nrecovers its transmission revenue requirement (“TRR”) through a Commission-approved stated \nrate under the Trans Bay Tariff, which is invoiced and collected through the CAISO Access \nCharge rates under Section 26 of the CAISO Open Access Transmission Tariff (“CAISO Tariff”).  \nAs a Non-LSE PTO under the CAISO Tariff and Transmission Control Agreement,7 Trans Bay \nserves no retail load.8 \nB. \nShow Cause Order \n \nOn June 18, 2026, the Commission initiated a show cause proceeding against CAISO and \nthe PTOs pursuant to section 206 of the FPA.  The Show Cause Order directed CAISO and the \nPTOs to explain why the CAISO Tariff and the Transmission Owner Tariffs of the PTOs (“PTO \nTariffs”) remain just and reasonable and not unduly discriminatory or preferential without certain \ntariff provisions addressing:9  \n \n6  \nCAISO Tariff, App. A (defining Non-Load-Serving Participating TO).   \n7  \nCAISO Rate Schedules, Amended and Restated Transmission Control Agreement.   \n8  \nTrans Bay Tariff § 1 (stating that Trans Bay is a Non-LSE PTO and does not provide retail electric service to \nEnd-Use Customers); id. § 3 (definition of “Non-Load-Serving Participating TO”); see also CAISO Tariff, App. A \n(Non-LSE PTO). \n9  \nShow Cause Order at P 31."},{"page":3,"startToken":812,"endToken":1248,"text":"3 \n \na) the application process, study procedures, and ongoing operational requirements that \napply to Eligible Customers10 seeking transmission service on behalf of Large Loads; \nb) additional transparency concerning the network upgrade11 costs to provide transmission \nservice to Eligible Customers on behalf of Large Loads; and a pro forma cost recovery \nagreement between CAISO, the relevant transmission owner, and the Eligible Customer \ntaking transmission service on behalf of the Large Load to mitigate the risk of cost \nshifting among transmission customers, and a mechanism to ensure such payments are \nappropriately credited toward transmission owners’ TRRs consistent with the \nCommission’s cost-of-service regulations; \nc) the rates, terms, and conditions of service that apply to co-location arrangements; \nd) transmission services that reflect Eligible Customers taking transmission service on \nbehalf of co-located loads, load with behind the meter generation, and flexible Large \nLoads that are willing and able to limit their use of the transmission system under certain \nconditions;12 and \ne) the rates, terms, and conditions of service applicable to interconnection customers serving \nelectrically proximate Large Load or co-located load. \nAlternatively, respondents may explain what changes to their tariffs would remedy the identified \nconcerns if the Commission were to determine that the tariffs have in fact become unjust and \nunreasonable or unduly discriminatory or preferential and proceeds to establish a replacement \ntariff.13 \nC. \nMotion for Abeyance \n \nOn August 3, 2026, pursuant to Rule 212 of the Commission’s Rules of Practice and \nProcedure, CAISO and the joint PTOs, which included Trans Bay, each filed motions to hold the \nabove-referenced show cause proceeding in abeyance for 90 days, pending completion of \nCAISO’s stakeholder proceedings and development of the companies’ respective FPA section \n205 filings to address the Commission’s preliminary findings in the Show Cause Order \n \n10  Trans Bay Tariff § 3.24 (definition of “Eligible Customer”). \n11  The Show Cause Order uses the term network upgrades throughout the order to refer to modifications or \nadditions to transmission-related facilities that are integrated with and support the overall transmission system.  See \nShow Cause Order at P 3 n.13 (citing pro forma OATT § 1.27 (Definitions – Network Upgrades)).  CAISO’s current \ndefinition of Network Upgrades applies only to additions, modifications, and upgrades required to accommodate the \nInterconnection of generating facilities.  Id. (citing CAISO Tariff, App. A (Definitions), Network Upgrades (0.0.0)). \n12  For purposes of the Show Cause Order, “flexible” Large Loads are a subset of Large Loads that are not co-\nlocated with generation but are willing and able to limit their energy withdrawals from the transmission system \nunder certain conditions.  See id. at P 3 n.14. \n13  Id. at P 3."},{"page":4,"startToken":1248,"endToken":1690,"text":"4 \n(“Abeyance Motions”).14  The Commission granted the Abeyance Motions and held this \nproceeding in abeyance, in full, including responses to the Show Cause Order and briefing \nquestions, for 90 days.15  \nII. \nTRANS BAY’S PROPOSED TRANSMISSION OWNER TARIFF REVISIONS \n \nThe proposed Trans Bay Tariff revisions are just and reasonable and not unduly \ndiscriminatory or preferential.  The proposed revisions establish an application process, study \nprocedures, operational requirements, and creditworthiness and financial security requirements \napplicable to requests by Eligible Customers seeking to interconnect a Large Load to the Trans \nBay transmission system.  The revisions are designed to consistently evaluate the reliability, \noperational, and planning impacts of proposed Large Loads, identify and allocate responsibility \nfor any Direct Assignment Facilities, Reliability Upgrades, and other Network Upgrades, and \nmitigate the risk of cost shifting associated with the Interconnection and service of Large Loads.  \nThe proposed revisions provide transparency and certainty regarding the information, studies, \nagreements, and credit and financial security commitments required from Eligible Customers \nseeking transmission service on behalf of Large Loads.16  The proposed amendments to the Trans \nBay Tariff fall into the following categories: \n(1) \nNew and revised defined terms in Section 3 of its Trans Bay Tariff, including \ndefinitions of Large Load, Flexible Interim Load Interconnection (“FILI”) \nService, Interconnection Facilities, Point of Interconnection, Network Upgrades, \nSite Control, Gross Load, Reliability Upgrade, Transmission Revenue \nRequirement; \n(2) \nRevisions to Section 5 of its Trans Bay Tariff to clarify Gross Load reporting \nassociated with Large Load consistent with the CAISO Tariff; \n(3) \nRevisions to Sections 8.1 and 10.1 through 10.17 of its Trans Bay Tariff to \nestablish an interconnection application process, readiness requirements, and \nstudy procedures specific to Large Load interconnections; \n(4) \nRevisions to Sections 8.1.5.1, 10.12, 10.17, and 16.12 of its Trans Bay Tariff to \nestablish operational and reliability requirements for Large Loads; \n(5) \nAdditions to Section 10.18 of the Trans Bay Tariff to establish rates, terms, and \nconditions of service applicable to co-located Large Load and FILI Service; \n \n14  Cal. Indep. Sys. Operator Corp., Motion for Abeyance of the California Independent System Operator \nCorporation, Docket No. EL26-71-000 (Aug. 3, 2026); Cal. Indep. Sys. Operator Corp., Request for Abeyance of \nSouthern California Edison Company et al., Docket No. EL26-71-000 (Aug. 3, 2026). \n15  Cal. Indep. Sys. Operator Corp., 196 FERC ¶ 61,131, at P 13 (2026). \n16  Trans Bay developed the proposed revisions herein in a good-faith effort to align with CAISO’s proposed tariff \nrevisions, and to the extent practicable given the parallel development of the PTOs’ filings and Trans Bay’s status as \na Non-LSE PTO, with the approaches of the other CAISO PTOs."},{"page":5,"startToken":1690,"endToken":2171,"text":"5 \n(6) \nInclusion of cost recovery, creditworthiness, and financial security provisions in \nSections 10.11.2, 10.17.1.2 and 13.2.1, and including a pro forma Cost Recovery \nAgreement as a new Attachment A to the Trans Bay Tariff for the purpose of \nprotecting against cost shifting and increasing transparency as to the Network \nUpgrade costs for Large Load interconnection; and \n(7) \nAdoption of transition provisions in Section 10.20 to protect existing and ongoing \ncommercial arrangements for Large Loads that are operational or have a \nCompleted Interconnection Application before February 16, 2027. \nTrans Bay’s proposed revisions are tailored to its status as a Non-LSE PTO, are \ncoordinated with and consistent with proposed CAISO Tariff revisions and satisfy the Show \nCause Order requirements applicable to a Non-LSE PTO.  Trans Bay has also incorporated \ncertain conforming and ministerial revisions, such as correcting punctuation and applying \nconsistent usage of terms.  Accordingly, Trans Bay respectfully submits that the proposed tariff \nrevisions are just and reasonable, not unduly discriminatory or preferential, and should be \naccepted by the Commission under section 205 of the FPA, effective as requested.  Trans Bay \nfurther requests that the Commission terminate the show cause proceeding with respect to Trans \nBay upon acceptance of the proposed tariff revisions. \nA. \nLarge Load Interconnection Process \nIn the Show Cause Order, the Commission made a preliminary finding that the CAISO \nTariff and PTO Tariffs appear to be unjust and unreasonable because they lack clear and \nconsistent provisions with respect to the application and study process for Eligible Customers \nseeking transmission and interconnection service on behalf of Large Loads.17  The Trans Bay \nTariff establishes, in Sections 8.1 and 10, a defined and time-limited interconnection process for \nLarge Loads with specific application, readiness, study, and operational requirements, and it \nclarifies how a Large Load interconnected to Trans Bay’s facilities obtains transmission service \nover the CAISO Controlled Grid.  Elements of this proposal include the following tariff \nimprovements for the integration of Large Loads. \n1. \nDefinition of Large Load   \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff and PTO Tariffs appear to be unjust and unreasonable because they \nlack a definition of Large Load sufficient to capture loads that present the unique challenges \ndescribed in the Show Cause Order.18 \nTrans Bay Solution:  In response to the Commission’s finding, Trans Bay proposes to \ndefine a Large Load as “[a]n End-User located at a single site behind one or more Points of \n \n17  Show Cause Order at PP 38, 49, 58.  Citations herein to the “Trans Bay Tariff” refer to the revised Trans Bay \nTO Tariff included as Appendices A and B to this filing.  Citations to the “CAISO Proposed Tariff” refer to the tariff \nrevisions CAISO is submitting contemporaneously in response to the Show Cause Order. \n18  Show Cause Order at PP 56, 57."},{"page":6,"startToken":2171,"endToken":2716,"text":"6 \nInterconnection to the CAISO Controlled Grid, and that has a peak load of 50 MW or greater.”19 \nThis definition is identical to the definition CAISO proposes to add to Appendix A of the CAISO \nTariff, and adopts the 50 MW threshold the Commission identified as reasonable.20  Trans Bay \nhas also adopted CAISO’s approach of not excluding co-located loads from the definition of \nLarge Load to ensure alignment between the two tariffs. \n2. \nApplication and Study Procedures \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff and PTO Tariffs appear to be unjust and unreasonable because they \nlack clear and consistent provisions addressing the application process and study procedures for \nEligible Customers to request transmission service on behalf of Large Loads.21  The Commission \nindicated that such processes should clarify that applications be accepted on a rolling basis; \nrequire a non-refundable application fee as well as staged readiness requirements; and specify \nthe information and data requirements to be submitted with an application.22 \nTrans Bay Solution:  The proposed tariff revisions leverage Trans Bay’s existing \napplication and study processes while identifying the additional procedures applicable to Large \nLoads due to their unique operational requirements and reliability impacts on the transmission \nsystem.  Trans Bay submits that this approach promotes transparency and administrative \nefficiency by providing a single, integrated framework for Large Load interconnection requests \nunder the Trans Bay Tariff.  This is responsive to the Show Cause Order’s concern regarding the \nlack of specificity for Large Loads and their unique operational characteristics and requirements. \nTrans Bay’s proposed tariff revisions establish the applicable provisions for Eligible \nCustomers requesting service on behalf of Large Loads (as defined in the Trans Bay Tariff).  \nFirst, revised Section 8.1 explicitly extends Trans Bay’s obligation to interconnect to entities \neligible to request interconnection to pursuant to FPA section 210(a) and Eligible Customers, \nincluding Large Loads owned or served by a third party.  Because Trans Bay is a Non-LSE PTO \nwith no retail customers, a Large Load connecting directly to Trans Bay’s facilities may not \nqualify as an “Eligible Customer” in certain instances.  Trans Bay therefore proposes, in new \nSection 10.2, a voluntary offer of unbundled retail transmission service, where consistent with \nstate law, so that Large Loads can request Interconnection and be studied under the Trans Bay \nTariff as the Show Cause Order contemplates.23 Second, revised Section 10.1 requires that a \nLarge Load Interconnection be requested pursuant to Section 10 of the Trans Bay Tariff and \n \n19  Trans Bay Tariff § 3.51 (definition of “Large Load”). \n20  CAISO Proposed Tariff, App. A (definition of “Large Load”); Show Cause Order at P 57. \n21  Show Cause Order at PP 56, 58. \n22  Id. at P 58. \n23  Id. at P 38 & n.117; see also id. at P 43 & n.123. See Trans Bay Tariff § 3.24 (definition of “Eligible \nCustomer”), id. § 10.2.  The offer covers only Interconnection and associated access to the CAISO Controlled Grid \nconsistent with the CAISO Tariff.  It does not include the sale of Energy, distribution service, or scheduling or \nsettlement in the CAISO Markets, and it is available on a non-discriminatory basis to all End-Use Customers on \nTrans Bay’s facilities, not only Large Loads."},{"page":7,"startToken":2716,"endToken":3281,"text":"7 \ncomply with Section 25.7 of the CAISO Tariff.24  Trans Bay affirms that under the Trans Bay \nTariff, applications are accepted on a rolling basis, and revised Section 10.4 requires Trans Bay \nto timestamp each Large Load Interconnection Application to establish study priority on a rolling \nbasis.  \n \nConsistent with the Commission’s concern that the tariffs specify which entity is \nresponsible for the study, Trans Bay is proposing revisions to Sections 10.1 and 10.4 to clarify \nthat the Eligible Customer is the entity that requests Interconnection on behalf of a Large Load.25 \nTrans Bay, as the interconnecting PTO, will perform the System Impact Study and Facilities \nStudy for the Eligible Customer taking transmission service on behalf of a Large Load pursuant \nto Section 10.26  As part of its study obligations, Trans Bay will apprise CAISO of Large Load \ninterconnections through its inputs to the Base Case, Interconnection Studies, and the \nTransmission Planning Process.27  Prior to energization of any Large Load, Trans Bay must \nprovide CAISO the information required by Section 25.7.1 of the CAISO Tariff, and the Eligible \nCustomer must provide that information to Trans Bay and notify Trans Bay of any material \nchanges within 10 Business Days.28  \nFurthermore, Trans Bay proposes new Section 10.5.1 to clarify additional application \nrequirements for Large Load interconnections.  Specifically, an Eligible Customer seeking to \ninterconnect a Large Load must submit: (i) the Large Load’s ramp schedule, identifying load \nadditions over time and maximum planned load; (ii) a site plan; (iii) documentation of the local, \nstate, and federal permits and regulatory approvals necessary to develop the Large Load; (iv) \ndocumentation demonstrating Site Control; (v) a single-line electrical diagram; (vi) information \non any other Interconnection requests made on behalf of the same Large Load or its affiliates; \n(vii) whether the Large Load intends to request Partial Interim Service or FILI Service; and (viii) \nfor a Large Load co-located with a Generating Facility, information sufficient for Trans Bay to \nensure compliance with Sections 25.1.1, 25.7.5, and 25.7.6 of the CAISO Tariff.  Because \nSection 10.3 requires every Interconnection Application to be copied to CAISO, Section \n10.5.1(vi) requires disclosure of other pending requests on behalf of the same Large Load to \nCAISO, as the Commission contemplated.29  Trans Bay and CAISO, as applicable, must \ndetermine whether an application is complete within ten (10) Business Days under Section 10.6. \nAn applicant must pay a $5,000 nonrefundable Large Load Interconnection Application \nfee.30  At the time of application, they must provide site plans, demonstration of Site Control \n \n24  Trans Bay Tariff §§ 8.1, 10.1; CAISO Proposed Tariff § 25.7 (providing that “End Users, including Large \nLoads, interconnect to the CAISO Controlled Grid pursuant to PTO and retail tariffs”). \n25  Trans Bay notes that there are circumstances in which the Large Load could itself be the Eligible Customer, in \nwhich case the Large Load would be requesting interconnection on its own behalf.   \n26  Trans Bay Tariff §§ 10.12, 10.16; Show Cause Order at PP 38 & n.117, 39 & n.118, 51. \n27  Trans Bay Tariff § 10.3. \n28  Id. §§ 8.1.5(v), 10.3. \n29  Show Cause Order at P 58. \n30  Trans Bay Tariff § 10.5; see also CAISO Tariff, App. KK § 3.5.1.1 (Interconnection Study Deposit)."},{"page":8,"startToken":3281,"endToken":3819,"text":"8 \n(which is newly defined to ensure control of the site), and receipt of necessary permits.31  These \nrequirements will ensure that interconnection applications are real, concrete, and nonspeculative.  \nFurthermore, Trans Bay proposes that, at the Large Load System Impact Study phase, the \nEligible Customer must provide a refundable study deposit of: (a) $35,000 plus $1,000 per MW \nfor Interconnection Requests less than 80 MW; (b) $150,000 for Interconnection Requests \ngreater than or equal to 80 MW but less than 200 MW; or (c) $250,000 for Interconnection \nRequests greater than 200 MW.32 The refundable study deposit amounts are consistent with those \nrequired in CAISO’s generator interconnection process.  At the Facilities Study phase, the \nEligible Customer must pay the estimated cost of the Facilities Study, and, before energization, \namongst other requirements, it must execute the Interconnection Agreement and pro forma Cost \nRecovery Agreement, and post all required financial security (Sections 10.17.2, 8.1.5.1(viii), and \n13.2.1).  These readiness requirements thus escalate at distinct phases throughout the study \nprocess, consistent with the Show Cause Order directives.33  An applicant that withdraws from \nthe process at any phase must reimburse Trans Bay for all costs reasonably incurred and may be \nresponsible for the cost of restudying later-queued applicants.  \nFor a Large Load Interconnection, the System Impact Study must evaluate the Large \nLoad’s operational characteristics, including its ramp schedule, its performance during system \ndisturbances, and any ability to limit its withdrawals from the CAISO Controlled Grid, consistent \nwith Section 25.7.1 of the CAISO Tariff.  The PTO will evaluate impacts to the transmission \nsystem using power flow and short circuit analyses, and any other analyses that may be \nappropriate including Electromagnetic Transient studies where warranted.  The completed \nSystem Impact Study will include a non-binding, good-faith estimate of the cost of Direct \nAssignment Facilities and Network Upgrades needed to accommodate the request and the time \nrequired to construct them, which the Facilities Study then refines.  Trans Bay may request \nadditional information, data, or models reasonably needed for the study, including models \nsuitable for Electromagnetic Transient studies.  The request then proceeds through Trans Bay’s \nexisting Facilities Study procedures, which refine the facilities design and the cost and schedule \nestimates for incorporation into the Interconnection Agreement. \n3. \nOperational and Reliability Requirements  \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff and PTO Tariffs appear to be unjust and unreasonable because they \nlack appropriate provisions regarding the ongoing operational requirements that will apply to \ntransmission customers serving Large Loads.34  The Commission further highlighted the lack of \ndetail on data available to CAISO regarding interconnected Large Loads for monitoring and \nreliability purposes, the lack of language enabling CAISO to remotely disconnect Large Loads \n \n31  A site subject to a development moratorium or other governmental restriction that prohibits the proposed use \ndoes not satisfy the Site Control requirement unless the restriction has been lifted or the applicant has obtained all \nnecessary approvals, exemptions, or variances. \n32  Trans Bay Tariff § 10.11.2; see also CAISO Tariff, App. KK § 3.5.1.1. \n33  Show Cause Order at PP 55, 58. \n34  Id. at PP 56, 59, 63."},{"page":9,"startToken":3819,"endToken":4266,"text":"9 \nvia installed equipment, the absence of specified ramp rate, ride-through, and control \ntechnologies or protection systems required.35  \nTrans Bay Solution:  It is Trans Bay’s understanding that CAISO is proposing changes \nto Section 25.7.1 of the CAISO Tariff to provide substantial additional clarity regarding ongoing \noperational requirements for Eligible Customers serving Large Loads, including Frequency Ride-\nThrough, Voltage Ride-Through, Post-Fault Active Power Recovery, and Ramp-Rate Limitation \nrequirements.  Accordingly, Trans Bay’s proposed Section 10.17 specifies that any Large Load \nInterconnection Agreement will require compliance with Section 25.7.1 of the CAISO Tariff, and \nproposed Section 10.3 requires Trans Bay to provide the information required by Section 25.7.1 \nto CAISO prior to energization of the Large Load.  This approach will ensure that Large Load \noperational requirements remain current with CAISO standards and provide transparency and \nregularity of operational standards that will support reliable operation of the overall grid.   \nTrans Bay also proposes a series of additional operational requirements mirroring CAISO \nTariff measures, specifically:  \n Following proposed CAISO Tariff Section 25.7.4 by requiring the Eligible \nCustomer, Large Load, Scheduling Coordinator, and Trans Bay to comply with \nany CAISO, Regional Entity, or Reliability Coordinator data request after a \ndisturbance or other reliability event involving a Large Load (Section 16.12); \n Ensuring visibility into Large Load operations by extending proposed CAISO \nTariff Section 25.7.3 requirements for the Scheduling Coordinator for each Large \nLoad to provide daily and hourly forecasts, material real-time deviations, outage \ninformation, and real-time telemetry (Sections 8.1.5.1(iii) and 10.17); and \n Following proposed CAISO Tariff Sections 25.7.1.1, 25.7.1.2, 25.7.1.3, and \n25.7.1.4, by requiring Large Load to meet all frequency ride-through \nrequirements, voltage ride through requirements, post-fault active power recovery \nrequirements, and ramp rate limitations established therein (Section 8.1.5.1(x)). \nFinally, Trans Bay proposes requirements for installation and maintenance of the \nequipment required to disconnect or otherwise isolate the Large Load (Sections 8.1.5.1(vi) and \n10.17), with those costs directly assigned to the applicant to avoid cost shifting to transmission \ncustomers (Section 8.1.2). \n4. \nAlternative Transmission Technologies   \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff and PTO Tariffs appear to be unjust and unreasonable because they \nlack clear and consistent provisions requiring the evaluation of alternative transmission \ntechnologies as potential solutions to an Eligible Customer’s request for service on behalf of a \nLarge Load,36 or requiring an explanation to the Eligible Customer why alternative transmission \n \n35  Id. at P 63. \n36  Id. at P 60."},{"page":10,"startToken":4266,"endToken":4757,"text":"10 \ntechnologies are not feasible or would not result in lower costs or a faster timeline \naccommodating the request.37  \nTrans Bay Solution:  The proposed revisions to Section 10.12.1 commit Trans Bay to \nconsidering alternative transmission technologies in the System Impact Study for every Large \nLoad Interconnection Application, without the need for a request from the Eligible Customer.  If \nTrans Bay selects traditional Network Upgrades instead, it must demonstrate why alternative \ntransmission technologies are not feasible or would not result in lower costs or a faster timeline \nfor accommodating the request.38  This provision is consistent with the proposed revision to \nCAISO Tariff Section 24.1, which extends CAISO’s consideration of alternative transmission \ntechnologies to Large Loads and contemplates the inclusion of similar language in the PTO \nTariffs. \n5. \nStudy Process Timeline \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the study processes could culminate in a report to the Eligible Customer describing \nthe Network Upgrades necessary to accommodate the service request as well as a non-binding \ngood-faith estimate of the cost and the time to construct such facilities, which should take no \nmore than 60-90 calendar days to complete.39  \nTrans Bay Solution:  Trans Bay proposes the adoption of revised Section 10.12 and \n10.12.1 to its tariff requiring that a System Impact Study for a Large Load provide a non-binding, \ngood-faith estimate of the cost of Direct Assignment Facilities and Network Upgrades needed to \naccommodate the request and a similar good-faith time estimate required to construct them.  \nFollowing the System Impact Study, pursuant to Section 10.16 the Facilities Study will refine \nthose estimates leading into the Interconnection Agreement process.40  The report will be \navailable following the System Impact Study, consistent with the Show Cause Order directive.  \nTrans Bay also recognizes the need for timely progression of required studies.  \nAccordingly, the proposed Trans Bay Tariff revisions shorten the timeline for interconnection \nstudies at each step of the process to the maximum extent achievable (Sections 10.8 - 10.12).  \nUnder the proposed Large Load study procedures, Trans Bay must notify the applicant whether a \nSystem Impact Study is required within ten (10) Business Days of the Completed Application \nDate and must tender a System Impact Study Agreement within ten (10) Business Days of \nreceipt of the Completed Interconnection Application.  The applicant must execute that \nagreement within ten (10) Business Days and, for a Large Load Interconnection, remit a study \ndeposit together with financial security drawable to cover System Impact Study costs and, if \nnecessary, Facilities Study costs.  Trans Bay must complete the System Impact Study no later \nthan ninety (90) Calendar Days after the Completed Application Date.  This 90-day timeline runs \nfrom the Completed Application Date, not from execution of the System Impact Study \n \n37  Id. at P 61. \n38  Trans Bay Tariff § 10.12.1. \n39  Show Cause Order at P 62. \n40  Trans Bay Tariff § 10.16."},{"page":11,"startToken":4757,"endToken":5208,"text":"11 \nAgreement, and therefore includes the time for the System Impact Study Agreement and deposit \nsteps.  The result of this proposed schedule is the initiation and completion of a System Impact \nStudy within the 60-90 calendar day range that the Commission identified as reasonable.  \n \nThis proposed structure is consistent with the study process the Commission accepted for \nSouthwest Power Pool, Inc.’s (“SPP”) High Impact Large Loads (“HILL”).  For that process, \nSPP must complete its HILL Delivery Point Study and issue a study report within 90 calendar \ndays after receiving the executed study agreement, study data, and deposit.41  That study uses \npower flow and short circuit analyses; SPP then performs an Electromagnetic Transient study \nonly when those analyses identify system weaknesses caused by the Large Load, similar to Trans \nBay’s Large Load System Impact Study process.42  The HILL Delivery Point Study works “in \nconjunction with” SPP’s existing load connection study requirements.43  It is followed, as \nneeded, by a supplemental load connection study performed by the host transmission owner and \nby SPP’s existing processes for obtaining long-term transmission service.  SPP’s tariff does not \nsubject those later steps to the 90-day deadline,44 but the Commission found this process just and \nreasonable.45  Trans Bay’s approach follows the same structure.  A time-certain System Impact \nStudy culminates in a report within 90 days, and that report gives the Eligible Customer the \ninformation the Show Cause Order requires. \nB. \nCo-Located Load  \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff appears to be unjust and unreasonable because it lacks sufficiently \nclear and consistent tariff provisions addressing the rates, terms, and conditions that apply to co-\nlocation arrangements.46  \nTrans Bay Solution:  As acknowledged by the Commission in its Show Cause Order and \nfurther addressed in Part III below, Trans Bay has a limited role in addressing co-location of \ngeneration with Large Load.  The interconnection of wholesale generation to the CAISO \nControlled Grid is governed by the CAISO Tariff, including the Resource Interconnection \nStandards in Appendix KK.  Trans Bay’s role is to process and study the Interconnection of a \nLarge Load and to coordinate with CAISO so that the generating facility and the Large Load are \nstudied, interconnected, and operated together.  As revised, the Trans Bay Tariff and CAISO \nTariff jointly allocate those responsibilities. \nRecognizing CAISO’s predominant role in studying generator interconnections, Trans \nBay proposes the adoption of tariff provisions that tie into CAISO requirements including: \n \n41  See Sw. Power Pool, Inc., 194 FERC ¶ 61,031, at P 15 (2026). \n42  Id. \n43  Id. at P 62.   \n44  Id. at P 16. \n45  Id. at P 62. \n46  Show Cause Order at PP 85, 93-102."},{"page":12,"startToken":5208,"endToken":5676,"text":"12 \n New Section 10.18.6 requires Trans Bay to study co-located Large Loads in \naccordance with proposed CAISO Tariff Section 25.7.6 and requires specific \ninformation regarding the net injection or net withdrawal of the combined co-\nlocated arrangement.47   \n Proposed Section 10.5.1(viii) requires the Large Load Interconnection Application \nto include information about the co-located Generating Facility sufficient to \nensure compliance with Sections 25.1.1, 25.7.5, and 25.7.6 of the CAISO Tariff. \n Alignment of Trans Bay procedures to ensure the planned coordination envisioned \nin the proposed CAISO Tariff Section 25.7.6 by which CAISO will conduct \nInterconnection Studies in coordination with the PTO that account for the net \nimpact of the co-located configuration on the CAISO Controlled Grid, with \nmemorialization of the combined co-located operation in the Generator \nInterconnection Agreement.  Trans Bay respectfully defers to CAISO on its \ndescription of the generator interconnection revisions and processes. \nHowever, Trans Bay notes that proposed new Section 10.18.6 of the Trans Bay Tariff \nprovides that the Interconnection processes applicable to a co-located Large Load are otherwise \nthe same as those applicable to any other Large Load, and are, therefore, subject to the same \nreadiness requirements, study timelines, ride-through and ramp-rate requirements, energization \nconditions, and cost recovery obligations as a Large Load.  This treatment avoids undue \ndiscrimination between the two configurations while accounting for the technical characteristics \nunique to co-location.  \nAdditionally, in Section 10.18.6, Trans Bay provides a path for adhering to CAISO’s \nproposed revised CAISO Tariff Section 25.1.1 such that a Generating Unit that will not inject \nEnergy onto the CAISO Controlled Grid and will instead serve a co-located End User as \npermitted by the Local Regulatory Authority is not required to submit an Interconnection \nRequest pursuant to CAISO’s Appendix KK.  Section 10.18.6 also requires that, under such \narrangements, the Generating Unit has sufficient control technologies to ensure the co-located \narrangement has no material impact on the CAISO Controlled Grid.48  Proposed new Section \n8.1.5.1(ix) further provides that Trans Bay is not obligated to energize a co-located Large Load \nuntil necessary control and system protection technologies have been installed, tested, and \nvalidated; it also requires the Large Load to be metered separately from its co-located generation. \nC. \nFlexible Large Load Services \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff and PTO Tariffs appear to be unjust and unreasonable because they \nlack a study process for evaluating the ability of Large Loads to flexibly reduce demand and the \n \n47  Trans Bay Tariff §§ 10.5.1(viii), 10.18.6; CAISO Proposed Tariff § 25.7.6; CAISO Proposed Tariff, App. KK § \n2.4.4. \n48  CAISO Proposed Tariff § 25.1.1."},{"page":13,"startToken":5676,"endToken":6193,"text":"13 \ninformation required to study providing flexible service while maintaining reliability.49  The \nCommission also noted that the CAISO Tariff allows an interconnection customer to request a \nlimited operation study for a generating unit before its Interconnection Facilities or Network \nUpgrades are complete, but it offers no comparable interim option for load.50   \nTrans Bay Solution:  Trans Bay defers to CAISO regarding transmission service \nofferings such as the non-firm or flexible services discussed in the Show Cause Order. \n \nWith respect to interconnection service, Trans Bay proposes two interim services that \nallow a Large Load to begin taking interconnection service before all of its upgrades are in place \nthat reflects the Large Load’s ability to reduce load: the existing Partial Interim Service and FILI \nService.  Both services will be available to Eligible Customers serving Large Load. The process \nfor application and receipt of these forms of interconnection service will include the following \nsteps. \n \nTrans Bay proposes to define FILI Service as aligned with CAISO’s proposed \ndefinition.51  Under new Section 10.18.2, FILI Service is available if the Large Load can reduce \nits load at a specified Point of Interconnection according to protocols in a FILI Service \nAgreement among the Large Load, Trans Bay, and CAISO.  The FILI Service Agreement \nspecifies the Network Upgrades or Interconnection Facilities needed to conclude FILI Service \nand provide full Interconnection service.52  To align with CAISO’s revised Tariff, Section 10.18.3 \nrequires the agreement to identify required Interconnection Facilities, protection and control \nsystems, equipment, and operating limitations that apply, and FILI Service may not commence \nuntil all such equipment is installed and commissioned.   \n \nThe Eligible Customer must state in its Interconnection Application whether it intends to \nrequest Partial Interim Service or FILI Service.  Under the new Section 10.18, Trans Bay will \nthen perform an analysis and report the extent to which each requested interim service can be \nprovided consistent with the Trans Bay Tariff and proposed Section 25.7.2 of the CAISO Tariff \nestablishing FILI Service.53  The maximum amount of interim service is based on the anticipated \navailability of capacity and the information the Eligible Customer submits, and Trans Bay will \nupdate the analysis annually.  In addition, Section 10.12.1 requires the Large Load System \nImpact Study procedures to evaluate any ability of the Large Load to limit its withdrawals from \nthe CAISO Controlled Grid so that the study process itself recognizes the operational \ncharacteristics of flexible Large Loads. \n \n49  Show Cause Order at PP 59, 104-05. \n50  Id. at P 27. \n51  Trans Bay Tariff § 3.35 (definition of “Flexible Interim Load Interconnection (‘FILI’) Service”); CAISO \nProposed Tariff, App. A; CAISO Proposed Tariff § 25.7.2.  FILI Service is defined as “[c]urtailable, interim \ninterconnection service for a Large Load provided by the CAISO and Participating TO, enabling the Large Load to \ninterconnect prior to the completion of the Large Load’s Network Upgrades or Interconnection Facilities.”   \n52  CAISO will post the FILI Service Agreement on its website.  See CAISO Proposed Tariff § 25.7.2.  \n53  Trans Bay Tariff §§ 10.18, 8.1.5.1(vii)."},{"page":14,"startToken":6193,"endToken":6732,"text":"14 \nNew Section 10.18.4 requires the FILI Service Agreement to specify the circumstances, \ncontingencies, and operating conditions under which the Large Load may be curtailed; the \ncurtailment mechanism; the entity responsible for performing the curtailment; and the \nnotification method, required response times, permissible duration, restoration timeline, testing \nand verification requirements, and interim operating limits.  Further, new Section 10.18.5 permits \nCAISO or Trans Bay to terminate FILI Service and disconnect the Large Load if it does not \nadhere to the FILI Service Agreement, consistent with Good Utility Practice.  Further, Section \n10.17 requires the Large Load Interconnection Agreement to contain provisions requiring the \ninstallation and maintenance of any equipment or facilities necessary for the PTO to ensure its \nability to disconnect or otherwise isolate the Large Load as required by Section 25.7.1 of the \nCAISO Tariff.  Section 8.1.5.1(vii) makes an effective FILI Service Agreement a condition of \nenergization where applicable.  These provisions align with CAISO’s proposal in Section 25.7.2 \nof the CAISO Tariff.  \nD. \nCost Shifting and Cost Recovery Agreements \nCommission Concerns:  In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff and PTO Tariffs appear to be unjust and unreasonable because they \nlack adequate mechanisms to mitigate the risk of cost shifting among transmission customers.54  \nThe Show Cause Order directed the PTOs to address: (i) assignment of the Network Upgrade \ncosts and their associated costs, that are needed to provide transmission service to Eligible \nCustomers serving Large Loads; (ii) the need for a pro forma cost recovery agreement to \nmitigate the risk of cost shifting; and (iii) a mechanism to ensure that any payments attributable \nto the Large Load are appropriately credited toward the PTO’s TRR and documented in the \nannual informational filing for formula rates.55  The Commission also indicated a response \nshould clarify how the minimum contribution and financial security required by an Eligible \nCustomer serving a Large Load is calculated, i.e., whether by a per-MW figure or another \nmethodology.56 \nTrans Bay Solution:  Through Section 10.17.2, Trans Bay will utilize a Cost Recovery \nAgreement in the form of Attachment A to the Trans Bay Tariff to address assignment of costs \nassociated with the construction and operation of any Network Upgrades resulting from the \nInterconnection of the Large Load.  The Cost Recovery Agreement will be between Trans Bay \nand the Eligible Customer, and CAISO may join at its election.57  The Cost Recovery Agreement \nrequires the Eligible Customer to pay 100% of the actual costs of the Large Load Network \nUpgrades through the Total Required Revenue Commitment.  The Total Required Revenue \nCommitment establishes both the obligation to pay actual costs and the obligation to maintain \nfinancial security for the Eligible Customer.  If the Eligible Customer does not provide sufficient \nservice revenue attributable to the Large Load to Trans Bay through CAISO’s Access Charges to \ncover the Eligible Customer’s Annual Required Revenue Commitment, the Eligible Customer \nmust provide Cost Recovery Payments to fill the gap in cost recovery.  Cost Recovery \n \n54  Show Cause Order at P 65. \n55  Id. at PP 65-66, 76-84. \n56  Id. at PP 81-82. \n57  Trans Bay Tariff § 10.17.2; Attachment A."},{"page":15,"startToken":6732,"endToken":7268,"text":"15 \nPayments58 received will be treated as a credit in the next calculation of Trans Bay’s \nTransmission Revenue Requirement in Appendix I of its Tariff, by deducting the Cost Recovery \nPayments from the Transmission Revenue Requirement. Trans Bay will include a workpaper  \ndetailing such crediting and rate treatment in the filing at FERC implementing that calculation in \nAppendix I.  This ensures the Eligible Customer pays the full costs of their Network Upgrades.   \n The Cost Recovery Agreement also provides that the required amount of financial \nsecurity shall be decreased as the Eligible Customer pays the Total Required Revenue \nCommitment over time.  Trans Bay may draw upon the required financial security in the event of \nnon-payment, termination, cancellation, or withdrawal to ensure that the Large Load is \nresponsible for costs incurred to provide transmission service, including the cost of network \nupgrades and to prevent cost shifting to other customers.  \nTrans Bay has not proposed to allow an Eligible Customer to satisfy the financial security \nrequired under the Cost Recovery Agreement with credit support posted under a retail agreement.  \nThe Commission’s preliminary finding that an Eligible Customer “may include” such security \npermits this approach but does not require it.59  The approach does not fit a Non-LSE PTO.  \nTrans Bay has no retail customers and is not party to any retail service agreement.  Any retail \nsecurity would be held by a third-party load-serving entity, would secure that entity’s retail \nobligations, and be subject to that entity’s draw rights and priorities, none of which Trans Bay \ncan control or enforce.  Such security therefore would not be sufficient to secure the Eligible \nCustomer’s obligations under the Cost Recovery Agreement.  Accepting it would leave other \ntransmission customers exposed to the cost-shifting risk the Order is intended to prevent.  The \nconcern about duplicative credit requirements also does not arise here.  The security required \nunder the Cost Recovery Agreement secures a separate, Commission-jurisdictional payment \nobligation owed to Trans Bay, not the retail obligation owed to the load-serving entity.  \nRequiring a single form of security held directly by the transmission owner is also simpler to \nadminister and applies uniformly.    \nTrans Bay Tariff Section 10.17 requires the Interconnection Agreement itself to include \ncost responsibilities, financial security, and payment provisions for all engineering, equipment, \nconstruction, ownership, operation, and maintenance costs of any Direct Assignment Facilities, \nReliability Upgrades, Interconnection Facilities, or Network Upgrades.  Section 8.1.2 requires \nthe party requesting Interconnection to pay all such costs, and Trans Bay has specified that this \nincludes Interconnection for Large Loads throughout the Trans Bay Tariff.   \nLastly, Trans Bay’s Section 13.2.1 requires Trans Bay to conduct reasonable credit review \nprocedures and obtain financial security from the Eligible Customer.  The financial security may \ntake the form of an unconditional and irrevocable letter of credit or an alternative form \nacceptable to Trans Bay and consistent with commercial practices under the Uniform \nCommercial Code, in the amount of the Total Required Revenue Commitment set forth in the \nCost Recovery Agreement.60  Trans Bay’s Tariff conditions Large Load energization on posting \n \n58  As defined in Trans Bay Tariff, Att. A § 1.3. \n59  Show Cause Order at P 82.   \n60  Trans Bay Tariff §§ 8.1.5.1(viii), 13.2.1."},{"page":16,"startToken":7268,"endToken":7724,"text":"16 \nall required financial security pursuant to Section 8.1.5.1(viii) and asserts that this requirement \nwill be effectuated through the Cost Recovery Agreement.  \nThese provisions ensure that Eligible Customers and Large Loads, not other transmission \ncustomers, bear the costs incurred to serve them. \nE. \nPro Forma Transmission Service Agreements or Other Agreements \nCommission Concerns: In the Show Cause Order, the Commission made a preliminary \nfinding that the CAISO Tariff and PTO Tariffs appear to be unjust and unreasonable because they \nlack pro forma transmission service agreement language memorializing the above terms.61  Trans \nBay notes that the CAISO Tariff controls the provision of transmission service and defers to \nCAISO on this point.62  \nTransBay Solution: Specific to interconnection, Trans Bay believes the specificity in the \nrevised Trans Bay Tariff will provide certainty to potential Eligible Customers serving Large \nLoad with respect to the Commission’s primary concerns, including what ongoing operational \nand reliability requirements will apply, and the control CAISO will have over the Large Load.  \nThose areas and their enforceability appeared to be the primary concerns raised by the \nCommission in the Show Cause Order.63  While Trans Bay understands including the language in \na pro forma agreement may simplify compliance, Trans Bay has provided binding tariff language \nto remedy the Commission’s concern.  CAISO will be fully able to enforce this tariff language to \nensure the ongoing operational requirements are fully realized through individualized \ninterconnection agreements consistent with the Trans Bay Tariff.64  Trans Bay is further \nconcerned that developing a pro forma transmission service agreement in advance of establishing \nthe procedures through the Trans Bay Tariff, and CAISO Tariff as applicable, may be premature \nand commit Trans Bay to language that does not meet the needs of either Trans Bay or an \nEligible Customer taking transmission service on behalf of Large Loads.  Trans Bay also has yet \nto process any Large Load interconnection requests which could further inform the needs of a \npro forma Interconnection Agreement.  However, Trans Bay commits to participating in any \nfuture initiative involving the development of a pro forma Large Load Interconnection \nAgreement, in coordination with CAISO and other PTOs, and updating its Tariff accordingly. \nF. \nProtection for Existing Commercial Arrangements  \nCommission Concerns:  The Show Cause Order directed respondents to provide a \nreasoned explanation for how their proposal will avoid disrupting any existing commercial \n \n61  Show Cause Order at PP 56, 63. \n62  See id. at P 39 (“CAISO, however, is responsible for access to and the provision of transmission service, \nincluding transmission and ancillary services, to all Eligible Customers, and the reliability of that transmission \nservice.”). \n63  Id. at P 64. \n64  Id. (raising concerns that requirements may be unenforceable by CAISO without a pro forma agreement)."},{"page":17,"startToken":7724,"endToken":8062,"text":"17 \narrangements and provide a reasonable implementation period, including time to finalize \nagreements nearing completion, and include a reasonable effective date.65 \nTrans Bay Solution:  Trans Bay requests an effective date of February 16, 2027, which \nis coordinated with the effective date CAISO is requesting for its companion tariff revisions and \ngives Eligible Customers and Large Loads reasonable notice of the new requirements.  The new \nSection 10.20 of the Trans Bay Tariff provides that the provisions specific to Eligible Customers \nand Large Loads do not apply to a Load that is operational, or that has a Completed \nInterconnection Application, before February 16, 2027, unless and until the Load is modified or \nincreased such that it would be a Large Load, or the Load elects to be treated as a Large Load.66  \nThis transition provision mirrors proposed Section 25.7 of the CAISO Tariff.  This approach is \njust and reasonable. \nG. \nEnergization and Coordination with CAISO \nTrans Bay also clarifies in Section 8.1.5.1 that energization is conditioned on the Eligible \nCustomer demonstrating that:  \n \n The Interconnection Agreement and Cost Recovery Agreement are effective;  \n Any Energy the Large Load withdraws from the CAISO Controlled Grid will be \npurchased from an entity authorized to make such sales by the applicable Local \nRegulatory Authority;  \n A Scheduling Coordinator will represent the Large Load in compliance with \nSection 25.7.3 or 25.7.3.1 of the CAISO Tariff;  \n Access Charges will be paid consistent with the CAISO Tariff;  \n The information required by Section 25.7.1 of the CAISO Tariff has been \nprovided; \n Required equipment to facilitate monitoring, disturbance recording, telemetry, \ncommunication, control, protection, and disconnection has been installed, tested, \nand commissioned;  \n Any FILI Service Agreement is effective;  \n All required financial security has been posted;  \n For co-located or behind-the-meter configurations, control and protection \ntechnologies have been validated, and the Large Load is separately metered.  This \nensures no Large Load is energized until the information and equipment necessary \n \n65  Id. at P 34. \n66  Trans Bay Tariff § 10.20."},{"page":18,"startToken":8062,"endToken":8456,"text":"18 \nto preserve reliability and to operate consistent with CAISO requirements is in \nplace; and \n The Large Load meet all frequency ride-through requirements, voltage ride \nthrough requirements, post-fault active power recovery requirements, and ramp \nrate limitations in accordance with CAISO Tariff Sections 25.7.1.1, 25.7.1.2, \n25.7.1.3, and 25.7.1.4.  \nH. \nMinisterial and Conforming Revisions \nTrans Bay has also made several ministerial or conforming revisions to either clarify or \ncorrect its tariff language or to better clarify the Trans Bay Tariff’s relation to the CAISO Tariff.  \nThese include: \n Updating the Table of Contents; \n Clarifying in Section 1 that Trans Bay does not provide retail electric service; \n Clarifying in Section 1.3 how End-Users access the CAISO Controlled Grid; \n Updating the definition of Ancillary Services in Section 3.3; \n Updating the definition of Available Transfer Capacity in Section 3.5; \n Updating the definition of Congestion Management in Section 3.12;  \n Updating the definition of Dispatch in Section 3.18; \n Updating the definition of End-Use Customer or End-User in Section 3.21; \n Updating the definition of Facilities Study Agreement in section 3.27; \n Updating the definition of Generating Unit in Section 3.32; \n Updating the definition of Good Utility Practice in Section 3.34; \n Updating the definition of Interest in Section 3.46 to align with CAISO Tariff; \n Updating the definition of Local Publicly Owned Electric Utility in Section 3.53; \n Updating the definition of Metered Subsystem in Section 3.60; \n Updating the definition of Non-Load-Serving Participating TO in Section 3.65 to \nalign with CAISO Tariff; \n Updating the definition of Non-Spinning Reserve in Section 3.67 to align with \nCAISO Tariff; \n Updating the definition of Spinning Reserve in Section 3.86 to align with CAISO \nTariff; \n Updating the definition of Utility Distribution Company in Section 3.99; \n Defining FILI Service in Section 3.30 consistent with the CAISO Tariff; \n Clarifying Gross Load’s definition in Section 3.35 to better match CAISO; \n Revising the definition of “Interconnection” in Section 3.42 to address a \ntypographical error; \n Defining Interconnection Facilities in Section 3.45 to provide clarity; \n Defining Point of Interconnection in Section 3.73 to align with CAISO; \n Updating the definition of Regulation in Section 3.78; \n Revising the definition of Reliability Upgrade in Section 3.81 to refer to a \n“facility” rather than an undefined term;"},{"page":19,"startToken":8456,"endToken":8876,"text":"19 \n Ministerial additions of subsections and headers throughout Sections 8, 9, and 10 \nto enhance readability of the tariff for customers and stakeholders; \n Ministerial formatting revisions to correct section numbering throughout the \ntariff; \n Retitling Section 13 “Creditworthiness and Financial Security”;  \n Clarified tariff by consistent use of Eligible Customer throughout; and \n Updating the Designated Representatives in Appendix II to ensure responsiveness. \nIII. \nRESPONSES TO REMAINING ELEMENTS OF THE SHOW CAUSE ORDER \nThe Show Cause Order directed PTOs to explain which of the Commission’s directives \ntheir filing resolves and how it resolves them.67  Trans Bay submits that the remaining elements \nof the Show Cause Order are either inapplicable to Trans Bay as a Non-LSE PTO or were \ndirected to CAISO in the Show Cause Order.  \nThis includes the requirement to provide data on CAISO’s website regarding Network \nUpgrade costs and planning for serving Large Loads.68  CAISO has proposed that each \nTransmission Plan report the aggregate amounts of proposed and completed Large Load \nadditions by Transmission Zone and the planned Network Upgrades and estimated costs needed \nto accommodate Large Loads, identified by type of equipment.  For its part, Trans Bay will \nfacilitate this by providing relevant data under Section 10.3, which commits Trans Bay to apprise \nCAISO of Large Load interconnections through its inputs to the Base Case, Interconnection \nStudies, and the Transmission Planning Process.  \nThe Commission primarily directed its questions and findings on co-located load to \nCAISO, given CAISO’s role in generator interconnection.69  Trans Bay therefore defers to \nCAISO on matters governed by the CAISO Tariff.  To the extent the Commission’s directive \nimplicates the PTO Tariffs, Trans Bay has addressed it through Sections 8.1.5.1(ix), 10.5.1, and \n10.18.6 of the Trans Bay Tariff.  Trans Bay has revised its tariff to align with CAISO’s co-\nlocation approach. \nSimilarly, the Commission directed its preliminary finding regarding new transmission \nservices for flexible Large Loads, and its directive to submit an informational report regarding \nresource adequacy, solely to CAISO.70 \nLast, Trans Bay notes that CAISO has indicated that it intends to take up the matter of \ninterconnection of electrically proximate Large Load in a future stakeholder proceeding.  As \nsuch, Trans Bay proposes no tariff revisions in this filing for such elements identified in the \n \n67  Show Cause Order at P 34. \n68  Id. at PP 66, 70-75.  \n69  Id. at PP 93-102 (covering rate design, ancillary services, transmission service, behind-the-meter netting, and \ninterconnection via generator processes). \n70  Id. at PP 104 & n.222, 120-22."},{"page":20,"startToken":8876,"endToken":9350,"text":"20 \nShow Cause Order.71  This ensures that Trans Bay remains aligned with CAISO in this evolving \nprocess.  Trans Bay commits to participation in any such future stakeholder process with CAISO. \nIV. \nRESPONSES TO THE COMMISSION’S REMAINING BRIEFING QUESTIONS \nThe Show Cause Order requested responses to specific briefing questions.72  Consistent \nwith the division of responsibilities between CAISO and the PTOs recognized by the \nCommission in the Show Cause Order, Trans Bay responds to those briefing questions applicable \nto it as a PTO and defers to CAISO on those questions directed to CAISO or that concern matters \ngoverned by the CAISO Tariff.  \nIn the Show Cause Order, the Commission recognized that the framework under which \nCAISO provides transmission service is unique among the RTOs/ISOs and that certain \nresponsibilities fall to the PTOs.  The Commission explained that the PTOs “have responsibility \nfor wholesale load interconnection studies,” while CAISO “is responsible for access to and the \nprovision of transmission service, including transmission and ancillary services, to all Eligible \nCustomers, and the reliability of that transmission service.”73  The Commission further \nrecognized that the PTOs may be primarily responsible for conducting the studies that evaluate \nwhether a Large Load may be interconnected to the transmission system and whether Network \nUpgrades are necessary, that this role stems from how CAISO and the PTOs allocated rights and \nresponsibilities in the governing documents establishing CAISO, and that the Commission does \nnot seek to alter that allocation of rights and responsibilities.74  Consistent with that framework, \nthe Commission directed the PTOs to respond to the extent the matters addressed herein \nimplicate aspects of their respective tariffs.75 \nWithin this framework, Trans Bay’s role is to process and study requests to interconnect \nEligible Customer Large Loads to its facilities under the Trans Bay Tariff, to construct any Direct \nAssignment Facilities and Reliability Upgrades required for those interconnections and recover \ntheir costs from the Eligible Customer, and to provide CAISO with the necessary information for \nits operations and its Transmission Planning Process.  Transmission service over the CAISO \nControlled Grid, including Trans Bay’s facilities, is provided by CAISO under the CAISO Tariff.  \nCAISO likewise administers the CAISO Markets and the generator interconnection procedures \nunder the CAISO Tariff, and the California Public Utilities Commission has primary \nresponsibility for resource adequacy within the CAISO footprint.76  Moreover, as a Non-LSE \nPTO, Trans Bay serves no retail load and does not forecast or plan for load growth within a retail \nservice territory.   \nAccordingly, where a briefing question is directed to CAISO or concerns matters \ngoverned by the CAISO Tariff, Trans Bay indicates the question is not applicable.  Where a \n \n71  Id. at PP 113-19, 127. \n72  Id. at PP 123-27.  \n73  Id. at P 39. \n74  Id. at P 51. \n75  Id. at P 40; see also id. at P 34. \n76  Id. at P 122."},{"page":21,"startToken":9350,"endToken":9782,"text":"21 \nbriefing question concerns matters within Trans Bay’s responsibilities as a PTO, Trans Bay has \naddressed it through the proposed revisions to the Trans Bay Tariff, most of which are discussed \nin Part II above.  To assist the Commission’s review, Trans Bay identifies below each briefing \nquestion and where it is addressed in this transmittal letter. \n1. \nWhat would be a reasonable implementation period to ensure minimal \ndisruption to such existing commercial arrangements? \nThis question is addressed in Part II.F and Part V of this transmittal letter.  Trans Bay \nrequests an effective date of February 16, 2027, which aligns with the effective date CAISO is \nrequesting for its tariff revisions, gives Trans Bay time to implement the revised procedures and \nupdate its business practices, and gives Eligible Customers and Large Loads reasonable notice of \nthe new requirements.   \n2. \nHow to allow a reasonable amount of time to finalize ongoing agreements \nthat are nearing completion as of the date such tariff provisions are filed with \nthe Commission. \nThis question is addressed in Part II.F of this transmittal letter.  Consistent with CAISO’s \nproposed Section 25.7, the provisions of the Trans Bay Tariff specific to Eligible Customers and \nLarge Loads will not apply to a Load that is operational, or that has a Completed Interconnection \nApplication, before the effective date, unless and until the Load is modified or increased such \nthat it would be a Large Load, or the Load elects to be treated as a Large Load.  An \ninterconnection request that is complete before the effective date may therefore proceed through \nits studies and Interconnection Agreement under the existing provisions of the Trans Bay Tariff, \nwithout being required to satisfy the new application, readiness, and financial security \nrequirements. \n3. \nWhat, if any, potential impacts on regional and local transmission planning \nwould arise from the introduction of the new transmission services discussed \nherein?  \nAs to the effects on regional and local transmission planning, Trans Bay participates in \nCAISO’s Transmission Planning Process, and its proposed revisions are designed to give CAISO \nand other planners accurate, timely information about Large Loads.  Under Section 10.3, Trans \nBay will apprise CAISO of Large Load interconnections through its inputs to the Base Case, \nInterconnection Studies, and the Transmission Planning Process.  CAISO, in turn, proposes to \ninclude planned and forecasted Large Loads, including transmission additions or upgrades \nplanned under all PTO Tariff interconnection processes, as inputs to its Unified Planning \nAssumptions and Study Plan.  CAISO will also review those planned additions monthly and \nidentify any that indicate high operational risk or uncertainty based on NERC Reliability \nStandards."},{"page":22,"startToken":9782,"endToken":10234,"text":"22 \n4. \nWhen planning for load growth, how would transmission providers and \nplanners account for flexible Large Loads’ potential preference to take the \nnew transmission services, including potential uncertainties around the type, \nlocation, and quantity of such expected loads? \nThe readiness requirements in Section 10.5.1, including ramp schedules, Site Control, \npermits, and disclosure of affiliated requests, reduce uncertainty about the type, location, and \nquantity of expected Large Loads and help ensure that planners rely on credible projects rather \nthan speculative ones.  For flexible Large Loads that elect interim service, each FILI Service \nAgreement will identify the Network Upgrades or Interconnection Facilities required to conclude \nFILI Service.  CAISO will account for FILI loads in its Base Case, Full Network Model, and \nOperating Procedures.  Thus, following the proposed revisions CAISO can therefore account for \nboth the curtailable interim operation of these loads and the facilities required to transition them \nto full service.  The proposed revisions from CAISO, Trans Bay, and other PTOs should enhance \nthe flow of information regarding Large Loads into CAISO’s transmission planning process. \n5. \nInformation regarding potential structures for agreements between the \ntransmission owner/provider and an Eligible Customer to prevent unjust and \nunreasonable cost shifts among transmission customers related to Network \nUpgrade costs required for Large Loads. \nThis question is addressed in Part II.D of this transmittal letter. \n6. \nInformation on what an appropriate minimum level of cost recovery and \nfinancial security from an Eligible Customer would be under any such \nagreements. \nThis question is addressed in Part II.D of this transmittal letter. \n7. \nWhether the Tariff remains just and reasonable without provisions that \nrequire the evaluation of alternative transmission technologies in studies for \nthe provision of transmission service, using models that are capable of \nevaluating the transmission system to accurately account for advanced \ntransmission technologies, in all instances, without the need for a request \nfrom the Eligible Customer seeking transmission service on behalf of Large \nLoad. \nThis question is addressed in Part II.A.4 of this transmittal letter.  Trans Bay proposed \nprovisions that require the evaluation of alternative transmission technologies. \n8. \nIf traditional Network Upgrades are selected instead of alternative \ntransmission technologies, inclusion in the study report to the Eligible \nCustomer seeking transmission service on behalf of Large Load of a \nsufficiently clear demonstration of why alternative transmission technologies \nare not feasible (i.e., would not resolve reliability violations identified or meet \nthe relevant planning criteria) or would not result in lower costs or a faster \ntimeline for accommodating the transmission service request. \nThis question is likewise addressed in Part II.A.4 of this transmittal letter.  Section \n10.12.1 of the Trans Bay Tariff provides that, if traditional Network Upgrades are selected"},{"page":23,"startToken":10234,"endToken":10581,"text":"23 \ninstead of alternative transmission technologies, Trans Bay will provide a demonstration of why \nalternative transmission technologies are not feasible or would not result in lower costs or a \nfaster timeline for accommodating the Large Load Interconnection request, and a copy of the \ncompleted System Impact Study will be made available to the Eligible Customer. \n9. \nWhether specific characteristics of providing transmission service to Eligible \nCustomers on behalf of Large Loads warrant requirements beyond those \ncontemplated here, we seek further briefing. \nTrans Bay does not propose requirements beyond those described in Part II of this \ntransmittal letter at this time.   \n10. \nTo what extent would CAISO allow an interconnection customer’s \ngenerating facility serving electrically proximate Large Load or large co-\nlocated load to participate in CAISO’s energy and ancillary services market, \nand if CAISO were to allow them to participate, what restrictions or \nmitigation would CAISO apply? \nNot applicable.  \n11. \nTo the extent that CAISO plans for the electrically proximate Large Load or \nlarge co-located load associated with an interconnection customer’s \ngenerating facility for resource adequacy purposes, would CAISO account for \nthe generating facilities serving electrically proximate Large Load or large co-\nlocated load in the resource adequacy construct?  \nNot applicable.  \na. Would CAISO allow the generating facilities serving electrically \nproximate Large Load or large co-located load to participate in CAISO’s \ncapacity market?   \nNot applicable.  \n \nb. Would CAISO accredit these generating facilities using the same method \nas other CAISO generating facilities?   \nNot applicable.  \nV. \nPROPOSED EFFECTIVE DATE AND WAIVER \n \nTrans Bay respectfully requests that the Commission accept the proposed revisions as of \nFebruary 16, 2027, which aligns with the effective date proposed by the CAISO in its section \n205 filing.77  The requested effective date is consistent with the Commission’s directive that tariff \nrevisions include a reasonable implementation period and a reasonable effective date to ensure \nminimal disruption to existing or ongoing commercial arrangements.78  Although Trans Bay is \nnot aware of any existing commercial arrangements that would be affected by the tariff revisions \n \n77  CAISO Proposed Tariff § 25.7. \n78  Show Cause Order at P 5."},{"page":24,"startToken":10581,"endToken":10818,"text":"24 \nproposed herein, the requested effective date will provide Trans Bay adequate time to implement \nthe tariff changes, update applicable procedures and business practices, and ensure that requests \nfor service from Eligible Customers taking transmission service on behalf of Large Loads are \nprocessed in a manner consistent with the revised tariff framework.  Establishing an effective \ndate that aligns with CAISO’s implementation schedule will promote consistent application of \nthe revised tariff provisions throughout the CAISO Controlled Grid and avoid unnecessary \noperational and procedural uncertainty.  For these reasons, Trans Bay respectfully requests that \nthe Commission find that the proposed effective date is just and reasonable and complies with \nthe Commission’s directive regarding implementation timing. \n \nTo the extent necessary, Trans Bay respectfully requests waiver of any applicable \nrequirement of Part 35 not addressed herein. \nVI. \nCONTENTS OF THE FILING \nIn addition to this transmittal letter, this filing contains the following components: \n \nAppendix A:  Clean Version of the Revised Trans Bay Tariff;  \n \nAppendix B:  Redlined Version of the Revised Trans Bay Tariff; and \n \nAppendix C: Pro Forma Cost Recovery Agreement. \nVII. \nCORRESPONDENCE AND SERVICE \n \nThe following persons are authorized to receive notices and service with respect to this \nfiling:   \n \nElizabeth Ramey \nSenior Attorney \nNextEra Energy, Inc. \n801 Pennsylvania Avenue, NW \nSuite 220 \nWashington, DC 20004 \n(202) 909-5696 \nelizabeth.ramey@nexteraenergy.com\nMeghan O’Brien  \nVan Ness Feldman, LLP \n2000 Pennsylvania Avenue, NW \nSuite 6000 \nWashington, DC 20006 \n(202) 298-1800 \nmobrien@vnf.com"},{"page":25,"startToken":10818,"endToken":10950,"text":"25 \nVIII. CONCLUSION \n \nFor the reasons set forth above, Trans Bay respectfully requests that the Commission \naccept the proposed revisions to the Trans Bay Tariff, effective February 16, 2027.  Trans Bay \nfurthermore requests that the Commission determine with respect to the remaining elements of \nthe Show Cause Order that Trans Bay has complied with the Show Cause Order components \napplicable to it as a Non-LSE PTO.  Accordingly, Trans Bay respectfully requests that the show \ncause proceeding be terminated with respect to Trans Bay. \n \n \n \n \n \n \n \nRespectfully submitted, \n \n \n \n \n \n \n \n/s/ Meghan O’Brien  \n \n \n \n \n \n \n \n \nMeghan O’Brien  \nNolan Brickwood \nJoseph B. Nelson  \nJedrick M. Kim  \nVan Ness Feldman, LLP \n2000 Pennsylvania Avenue, NW \nSuite 6000 \nWashington, DC 20006 \n(202) 298-1800 \nmobrien@vnf.com  \nnbrickwood@vnf.com    \njbn@vnf.com   \njkim@vnf.com \n \n \n \n \n \n \n \nCounsel for Trans Bay Cable LLC \n \nEnclosure"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":503,"startToken":0,"endToken":427},{"p":2,"at":503,"title":"I. BACKGROUND","method":"printed heading","endPage":2,"endAt":520,"startToken":427,"endToken":429},{"p":2,"at":520,"title":"A. Trans Bay","method":"printed heading","endPage":2,"endAt":2166,"startToken":429,"endToken":680},{"p":2,"at":2166,"title":"B. Show Cause Order","method":"printed heading","endPage":3,"endAt":1558,"startToken":680,"endToken":1031},{"p":3,"at":1558,"title":"C. Motion for Abeyance","method":"printed heading","endPage":4,"endAt":206,"startToken":1031,"endToken":1280},{"p":4,"at":206,"title":"II. TRANS BAY’S PROPOSED TRANSMISSION OWNER TARIFF REVISIONS","method":"printed heading","endPage":5,"endAt":1392,"startToken":1280,"endToken":1900},{"p":5,"at":1392,"title":"A. Large Load Interconnection Process","method":"printed heading","endPage":11,"endAt":1554,"startToken":1900,"endToken":4994},{"p":11,"at":1554,"title":"B. Co-Located Load","method":"printed heading","endPage":12,"endAt":2542,"startToken":4994,"endToken":5594},{"p":12,"at":2542,"title":"C. Flexible Large Load Services","method":"printed heading","endPage":14,"endAt":1153,"startToken":5594,"endToken":6367},{"p":14,"at":1153,"title":"D. Cost Shifting and Cost Recovery Agreements","method":"printed heading","endPage":16,"endAt":304,"startToken":6367,"endToken":7314},{"p":16,"at":304,"title":"E. Pro Forma Transmission Service Agreements or Other Agreements","method":"printed heading","endPage":16,"endAt":2431,"startToken":7314,"endToken":7631},{"p":16,"at":2431,"title":"F. Protection for Existing Commercial Arrangements","method":"printed heading","endPage":17,"endAt":947,"startToken":7631,"endToken":7875},{"p":17,"at":947,"title":"G. Energization and Coordination with CAISO","method":"printed heading","endPage":18,"endAt":358,"startToken":7875,"endToken":8121},{"p":18,"at":358,"title":"H. Ministerial and Conforming Revisions","method":"printed heading","endPage":19,"endAt":475,"startToken":8121,"endToken":8516},{"p":19,"at":475,"title":"III. RESPONSES TO REMAINING ELEMENTS OF THE SHOW CAUSE ORDER","method":"printed heading","endPage":20,"endAt":195,"startToken":8516,"endToken":8907},{"p":20,"at":195,"title":"IV. RESPONSES TO THE COMMISSION’S REMAINING BRIEFING QUESTIONS","method":"printed heading","endPage":23,"endAt":1724,"startToken":8907,"endToken":10477},{"p":23,"at":1724,"title":"V. PROPOSED EFFECTIVE DATE AND WAIVER","method":"printed heading","endPage":24,"endAt":959,"startToken":10477,"endToken":10712},{"p":24,"at":959,"title":"VI. CONTENTS OF THE FILING","method":"printed heading","endPage":24,"endAt":1260,"startToken":10712,"endToken":10757},{"p":24,"at":1260,"title":"VII. CORRESPONDENCE AND SERVICE","method":"printed heading","endPage":25,"endAt":4,"startToken":10757,"endToken":10819},{"p":25,"at":4,"title":"VIII. CONCLUSION","method":"printed heading","endPage":25,"endAt":933,"startToken":10819,"endToken":10950}]}