{"document":{"slug":"rec-20261116-5372","title":"Response to 11/16/2026, Show Cause Order of Pacific Gas and Electric Company","issued":"2026-11-16","accession":"20261116-5372","docket":"ER27-513-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Pacific Gas and Electric Company","kind":"filing","file":"sources/filings/text/20261116-5372_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261116-5372","tier":"record","sha256":"ed3f2babe6590ce75a62fa6be141f25d33364bc3ce8d64b4435b49236fdf0439","pages":2,"tokens":203,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":117,"text":"1 \n \nUNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \n \n \n \n \n \n \n \n \n \n \nPacific Gas and Electric Company \n \n \nDocket No.  EL26-71-000 \n \n \n \n \nNOTIFICATION OF SECTION 205 FILING \n \n \nPacific Gas and Electric Company (“PG&E”) hereby provides an update in this \nproceeding. \n \nTo ensure a complete record, PG&E reports that on November 16, 2026, it \nsubmitted a Section 205 filing responsive to the Order to Show Cause in Docket No. \nEL26-71-000, which was assigned a new docket number ER27-513-000, with eLibrary \naccession number 20261116-5257.   \n \nRespectfully submitted, \n \nPACIFIC GAS AND ELECTRIC COMPANY \n \n \nBy:  /s/ John Perkins III \n \n \n \n        JOHN PERKINS III \n \n300 Lakeside Drive \nOakland, CA  94604 \nTelephone:  (501) 551-4036 \nE-mail:  John.Perkins@pge.com \n \nAttorney for \nPACIFIC GAS AND ELECTRIC COMPANY"},{"page":2,"startToken":117,"endToken":203,"text":"2 \n \nCERTIFICATE OF SERVICE \nI hereby certify that I have on this day caused a copy of the foregoing document to \nbe served upon all parties designated on the official service list in this proceeding in \naccordance with the requirements of Rule 2010 of the Commission’s Rules of Practice \nand Procedure. \n \nDated at Oakland, California, this 16th day of November, 2026. \n \n \n \n /s/ Gurjap Singh __ \nGurjap Singh \nPacific Gas and Electric Company \nFERC Electric Proceedings Dept. \n300 Lakeside Drive \nOakland, California 94612-3534 \nE-mail: Gurjap.Singh@pge.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":5,"startToken":0,"endToken":118},{"p":2,"at":5,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":2,"endAt":560,"startToken":118,"endToken":203}]}
