{"document":{"slug":"rec-20261118-3090","title":"Combined Notice of Filings #1, November 18, 2026: This notice contains information concerning multiple filings received by FERC","issued":"2026-11-18","accession":"20261118-3090","docket":"ER27-521-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"SECRETARY OF THE COMMISSION, FERC","kind":"filing","file":"sources/filings/text/20261118-3090_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261118-3090","tier":"record","sha256":"8ec8fdc5e5fc891b8cb759775a60a4897d2be41a66f289851b05ab4abae079fa","pages":null,"tokens":1605,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":1605,"text":"UNITED STATES OF AMERICA\nFEDERAL ENERGY REGULATORY COMMISSION\n\nCOMBINED NOTICE OF FILINGS #1\n\n(November 18, 2026)\n\n\tTake notice that the Commission received the following Exempt Wholesale Generator filings:\n\nDocket Numbers:\nEG27-39-000\nApplicants:\nCircle City Energy Storage LLC\nDescription:\nCircle City Energy Storage LLC submits Notice of Self–Certification of Exempt Wholesale Generator Status.\nFiled Date:\n11/16/26\nAccession Number:\n20261116-5360\nComment Date:\n5 pm ET 12/7/26\n\n\nDocket Numbers:\nEG27-40-000\nApplicants:\nFelix 1, LLC\nDescription:\nFelix 1, LLC submits Notice of Self–Certification of Exempt Wholesale Generator Status.\nFiled Date:\n11/18/26\nAccession Number:\n20261118-5126\nComment Date:\n5 pm ET 12/9/26\n\n\nDocket Numbers:\nEG27-41-000\nApplicants:\nTravertine Solar LLC\nDescription:\nTravertine Solar LLC submits Notice of Self–Certification of Exempt Wholesale Generator Status.\nFiled Date:\n11/18/26\nAccession Number:\n20261118-5129\nComment Date:\n5 pm ET 12/9/26\n\n\n\t\n      \n        Take notice that the Commission received the following Electric Rate filings:\n\nDocket Numbers:\nER25-1708-001\nApplicants:\nDuke Energy Progress, LLC, Duke Energy Florida, LLC, Duke Energy Carolinas, LLC\nDescription:\nCompliance filing: Duke Energy Carolinas, LLC submits tariff filing per 35: Compliance Filing - Schedule 2 (Bayboro Unit 3) to be effective 6/1/2025.\nFiled Date:\n11/18/26\nAccession Number:\n20261118-5185\nComment Date:\n5 pm ET 12/9/26\n\n\nDocket Numbers:\nER26-3773-001\nApplicants:\nWalker Solar LLC\nDescription:\nTariff Amendment:  Response to Deficiency Letter to be effective 11/15/2026.\nFiled Date:\n11/18/26\nAccession Number:\n20261118-5164\nComment Date:\n5 pm ET 12/9/26\n\n\nDocket Numbers:\nER27-506-001\nApplicants:\nCalifornia Independent System Operator Corporation\nDescription:\nCompliance filing:  2026-11-18 Amendment to Large Load Amendment in Original Docket Number to be effective N/A.\nFiled Date:\n11/18/26\nAccession Number:\n20261118-5181\nComment Date:\n5 pm ET 12/9/26\n\n\nDocket Numbers:\nER27-521-000\nApplicants:\nSan Diego Gas & Electric\nDescription:\n§205(d) Rate Filing:  ER26-71 Order to Show Cause Tariff Revisions to be effective 2/16/2027.\nFiled Date:\n11/16/26\nAccession Number:\n20261116-5311\nComment Date:\n5 pm ET 12/7/26\n\n\nDocket Numbers:\nER27-522-000\nApplicants:\nPJM Interconnection, L.L.C.\nDescription:\n§205(d) Rate Filing:  Operational Requirements for Large Computational Load and Annual Reporting to be effective 1/16/2027.\nFiled Date:\n11/16/26\nAccession Number:\n20261116-5309\nComment Date:\n5 pm ET 12/7/26\n\n\nDocket Numbers:\nER27-523-000\nApplicants:\nViridon Path 15 LLC\nDescription:\n§205(d) Rate Filing:  Viridon Path 15 - Trans. Owner Tariff Response to Show Cause Order EL26-71 to be effective 2/16/2027.\nFiled Date:\n11/16/26\nAccession Number:\n20261116-5312\nComment Date:\n5 pm ET 12/7/26\n\n\nDocket Numbers:\nER27-526-000\nApplicants:\nMidcontinent Independent System Operator, Inc.\nDescription:\n§205(d) Rate Filing:  2026-11-16_Large Load Review, Cost Recovery and Transmission Services Filing to be effective 2/14/2027.\nFiled Date:\n11/16/26\nAccession Number:\n20261116-5323\nComment Date:\n5 pm ET 12/16/26\n\n\nDocket Numbers:\nER27-527-000\nApplicants:\nMidcontinent Independent System Operator, Inc.\nDescription:\n§205(d) Rate Filing:  2026-11-16_Grid Responsive Integration Transmission Service Filing to be effective 3/16/2027.\nFiled Date:\n11/16/26\nAccession Number:\n20261116-5326\nComment Date:\n5 pm ET 12/7/26\n\n\nDocket Numbers:\nER27-528-000\nApplicants:\nLS Power Grid California, LLC\nDescription:\n§205(d) Rate Filing:  Revisions to TO Tariff to Provide for Large Load Interconnection.\nFiled Date:\n11/16/26\nAccession Number:\n20261116-5329\nComment Date:\n5 pm ET 12/7/26\n\n\nDocket Numbers:\nER27-529-000\nApplicants:\nNew York Independent System Operator, Inc., Central Hudson Gas & Electric Corporation, New York State Electric & Gas Corporation, Rochester Gas and Electric Corporation, Niagara Mohawk Power Corporation, Consolidated Edison Company of New York, Inc., Orange and Rockland Utilities, Inc.\nDescription:\n§205(d) Rate Filing: New York Independent System Operator, Inc. submits tariff filing per 35.13(a)(2)(iii: NYTOs 205: Proposed Revisions re: Integration of Large Loads to be effective 2/1/2027.\nFiled Date:\n11/16/26\nAccession Number:\n20261116-5335\nComment Date:\n5 pm ET 12/7/26\n\n\nDocket Numbers:\nER27-530-000\nApplicants:\nHorizon West Transmission, LLC\nDescription:\n§205(d) Rate Filing:  Horizon West Transmission - Response to Show Cause Order  EL26-71- to be effective 2/16/2027.\nFiled Date:\n11/16/26\nAccession Number:\n20261116-5337\nComment Date:\n5 pm ET 12/16/26\n\n\nDocket Numbers:\nER27-531-000\nApplicants:\nPJM Interconnection, L.L.C.\nDescription:\n§205(d) Rate Filing:  Proposed Tariff Revisions for Large Loads and Compliance with EL26-67 to be effective 3/16/2027.\nFiled Date:\n11/16/26\nAccession Number:\n20261116-5340\nComment Date:\n5 pm ET 1/15/27\n\n\nDocket Numbers:\nER27-532-000\nApplicants:\nCalifornia Independent System Operator Corporation\nDescription:\n§205(d) Rate Filing:  2026-11-16 Large Load Tariff Amendment: Resubmission.\nFiled Date:\n11/16/26\nAccession Number:\n20261116-5343\nComment Date:\n5 pm ET 12/16/26\n\n\nDocket Numbers:\nER27-533-000\nApplicants:\nGridLiance West LLC\nDescription:\n§205(d) Rate Filing:  GridLiance West - Response to Show Cause Order EL26-71 to be effective 2/16/2027.\nFiled Date:\n11/16/26\nAccession Number:\n20261116-5345\nComment Date:\n5 pm ET 12/16/26\n\n\nDocket Numbers:\nER27-534-000\nApplicants:\nDesertLink, LLC\nDescription:\n§205(d) Rate Filing:  Revisions to TO Tariff to Provide for Large Load Interconnection.\nFiled Date:\n11/16/26\nAccession Number:\n20261116-5346\nComment Date:\n5 pm ET 12/7/26\n\n\nDocket Numbers:\nER27-535-000\nApplicants:\nTrans Bay Cable LLC\nDescription:\n§205(d) Rate Filing:  Trans Bay Cable - Respsonse to Show Cause Order EL26-71- to be effective 2/16/2027.\nFiled Date:\n11/16/26\nAccession Number:\n20261116-5348\nComment Date:\n5 pm ET 12/16/26\n\n\nDocket Numbers:\nER27-548-000\nApplicants:\nPuget Sound Energy, Inc.\nDescription:\nTariff Amendment:  Notice of Cancellation of Multiple Agreements to be effective 12/21/2011.\nFiled Date:\n11/17/26\nAccession Number:\n20261117-5165\nComment Date:\n5 pm ET 12/8/26\n\n\nDocket Numbers:\nER27-549-000\nApplicants:\nWisconsin Public Service Corporation\nDescription:\nTariff Amendment:  Notices of Cancellation to be effective 1/1/2018.\nFiled Date:\n11/18/26\nAccession Number:\n20261118-5087\nComment Date:\n5 pm ET 12/9/26\n\n\nDocket Numbers:\nER27-550-000\nApplicants:\nSouthwest Power Pool, Inc.\nDescription:\n§205(d) Rate Filing:  Revisions to Modify Addendum 1 to Attachment AE to be effective 1/18/2027.\nFiled Date:\n11/18/26\nAccession Number:\n20261118-5088\nComment Date:\n5 pm ET 12/9/26\n\n\nDocket Numbers:\nER27-551-000\nApplicants:\nBurney Forest Products, A Joint Venture\nDescription:\nTariff Amendment:  Cancellation filing to be effective 11/18/2026.\nFiled Date:\n11/18/26\nAccession Number:\n20261118-5133\nComment Date:\n5 pm ET 12/9/26\n\n\nDocket Numbers:\nER27-552-000\nApplicants:\nCalifornia Independent System Operator Corporation\nDescription:\n§205(d) Rate Filing:  2026-11-18 VOM Adders, Cost for Storage Resources & ATF Cost Recovery Tariff Amd to be effective 12/31/9998.\nFiled Date:\n11/18/26\nAccession Number:\n20261118-5145\nComment Date:\n5 pm ET 12/9/26\n\n\nDocket Numbers:\nER27-553-000\nApplicants:\nPublic Service Company of New Mexico\nDescription:\n§205(d) Rate Filing:  NTEC TCIA Service Agreement No. 685 to be effective 10/19/2026.\nFiled Date:\n11/18/26\nAccession Number:\n20261118-5146\nComment Date:\n5 pm ET 12/9/26\n\n\nDocket Numbers:\nER27-554-000\nApplicants:\nSouthwest Power Pool, Inc.\nDescription:\n§205(d) Rate Filing:  Revisions to Attachment W to Update Index of Grandfathered Agreements to be effective 2/1/2027.\nFiled Date:\n11/18/26\nAccession Number:\n20261118-5151\nComment Date:\n5 pm ET 12/9/26\n\n\nDocket Numbers:\nER27-555-000\nApplicants:\nDuke Energy Carolinas, LLC\nDescription:\n§205(d) Rate Filing:  DEC-CEPCI Amended and Restated Reimbursement Agmt RS No. 665 to be effective 2/2/2027.\nFiled Date:\n11/18/26\nAccession Number:\n20261118-5201\nComment Date:\n5 pm ET 12/9/26\n\n\nDocket Numbers:\nER27-556-000\nApplicants:\nDuke Energy Progress, LLC\nDescription:\n§205(d) Rate Filing:  DEP-DEC Affected System Study Agreement SA No. 539 to be effective 1/18/2027.\nFiled Date:\n11/18/26\nAccession Number:\n20261118-5215\nComment Date:\n5 pm ET 12/9/26\n\n\nDocket Numbers:\nER27-557-000\nApplicants:\nAEP Texas Inc.\nDescription:\n§205(d) Rate Filing:  AEPTX-Coleto Creek Power Amended Generation Interconnection Agreement to be effective 10/31/2026.\nFiled Date:\n11/18/26\nAccession Number:\n20261118-5216\nComment Date:\n5 pm ET 12/9/26\n\n\n\t \n         Take notice that the Commission received the following Foreign Utility \nCompany Status filings:\n\nDocket Numbers:\nFC27-3-000\nApplicants:\nHesi Renewables Co., Ltd.\nDescription:\nHesi Renewables Co., Ltd. submits Notice of Self-Certification of Foreign Utility Company Status.\nFiled Date:\n11/16/26\nAccession Number:\n20261116-5359\nComment Date:\n5 pm ET 12/7/26\n\n\nDocket Numbers:\nFC27-4-000\nApplicants:\nHexa India Companies\nDescription:\nHexa India Companies submit Notice of Self-Certification of Foreign Utility Company Status.\nFiled Date:\n11/16/26\nAccession Number:\n20261116-5362\nComment Date:\n5 pm ET 12/7/26\n\n\nDocket Numbers:\nFC27-5-000\nApplicants:\nHexa Japan Companies\nDescription:\nHexa Japan Companies submit Notice of Self-Certification of Foreign Utility Company Status.\nFiled Date:\n11/16/26\nAccession Number:\n20261116-5363\nComment Date:\n5 pm ET 12/7/26\n\tThe filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number.\n\n\tAny person desiring to intervene, to protest, or to answer a complaint in any of the above proceedings must file in accordance with Rules 211, 214, or 206 of the Commission’s Regulations (18 CFR 385.211, 385.214, or 385.206) on or before 5:00 pm Eastern time on the specified comment date.    Protests may be considered, but intervention is necessary to become a party to the proceeding.\n\n\teFiling is encouraged.  More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at:http://www.ferc.gov/docs-filing/efiling/filing-req.pdf.  For other information, call (866) 208-3676 (toll free).  For TTY, call (202) 502-8659.\n\n\tFor public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, contact the Office of Public Participation at (202) 502-6595 or  OPP@ferc.gov.\n\n\n\n\nCarlos D. Clay,\nDeputy Secretary.\n\nheader1 (Word template)\nCNF1118261"}],"sections":[{"p":1,"at":0,"title":"Document text","method":"document text","endPage":1,"endAt":10569,"startToken":0,"endToken":1605}]}
