{"document":{"slug":"rec-20261118-5011","title":"Motion of Community Organizations and Clean Energy Advocates for a 30-day extension of time to submit comments re Midcontinent Independent System Operator,…","issued":"2026-11-18","accession":"20261118-5011","docket":"ER27-526-000","group":"MISO large-load tariff revisions","filer":"CLEAN ENERGY ADVOCATES","kind":"comments","file":"sources/filings/text/20261118-5011_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261118-5011","tier":"record","sha256":"2c164f112a35f8f102d1d6351c6933eed505fa296fbe3c3d9d6e6f5088c63637","pages":8,"tokens":1506,"emptyPages":[],"textThemes":["procedure"]},"pages":[{"page":1,"startToken":0,"endToken":294,"text":"1 \n \nUNITED STATES OF AMERICA   \nBEFORE THE   \nFEDERAL ENERGY REGULATORY COMMISSION \n \nMidcontinent Independent System \n \n) \nOperator, Inc. \n \n \n \n \n) \nDocket No. ER27-526 \n \n \n \n \n \n \n \n) \n \nMOTION OF COMMUNITY ORGANIZATIONS AND CLEAN ENERGY \nADVOCATES FOR EXTENSION OF TIME TO SUBMIT COMMENTS \n \nPursuant to Rule 212 and 2008 of the Federal Energy Regulatory \nCommission’s (“Commission”) Rules of Practice and Procedure,1 Community \nOrganizations2 and Clean Energy Advocates3 respectfully move for a 30-day \nextension of time to submit comments on Midcontinent Independent System \nOperator, Inc.’s (“MISO”) November 16, 2026 filing.4 As discussed further below, \nCommunity Organizations and Clean Energy Advocates have shown good cause for \nsuch extension.5 \n \n1 18 C.F.R. §§ 385.212 and 385.2008. \n2 Community Organizations are Community Collaboration on Climate Change and \nMichigan Environmental Justice Coalition, which are nonprofit organizations \nchartered under the laws of Michigan; and Midwest Tribal Energy Resources \nAssociation, a nonstock corporation chartered under the laws of Wisconsin. \n3 Clean Energy Advocates consist of Sierra Club, Natural Resources Defense \nCouncil, Sustainable FERC Project, and Fresh Energy which are nonprofit \nenvironmental organizations with members throughout MISO territory; and Clean \nGrid Alliance, a nonprofit corporation chartered under the laws of Minnesota. \n4 Midcontinent Independent System Operator, Inc.’s Large Load Review, Cost \nRecovery and Transmission Services Filing, Docket No. ER27-526 (filed November \n16, 2026) (submitted to comply with the Commission’s recent Show Cause Order in \nDocket No. EL26-70. Midcontinent Independent System Operator, Inc., 195 FERC ¶ \n61,212 (June 18, 2026)). \n5 In addition to the reasons stated below, granting this request would also have the \nadditional benefit of aligning the deadlines for MISO’s filing with that of PJM, \nwhich has requested a 60-day comment period ending on January 15, 2027. See, \ne.g., Proposed Tariff Revisions for Large Loads and Additional Compliance with Co-"},{"page":2,"startToken":294,"endToken":522,"text":"2 \n \nCommunity Organizations and Clean Energy Advocates request the \nCommission set a comment date of November 19, 2026, on this motion, and render a \ndecision by November 23, 2026, to allow parties to effectively plan their comments \non MISO’s filing. \nI. \nGOOD CAUSE EXISTS TO GRANT AN EXTENSION \n \nThe Commission may extend filing deadlines for good cause.6 Here, good \ncause exists for the Commission to grant the Community Organizations’ and Clean \nEnergy Advocates’ request for at least two independent reasons.   \nFirst, Congress is actively debating the Bipartisan American Affordability \nand Jobs Act (“BAAJA”).7 Enactment of that statute would constitute a significant \nlegal change that could directly bear on MISO’s Section 205 filing and FERC’s \nauthority to approve it. For instance, BAAJA Section 2107 contains directives \nregarding transmission cost allocation that may be inconsistent with MISO’s filing.   \n  An extension would allow parties and the Commission time to see whether \nBAAJA passes and, if so, permits interested parties to comment on how BAAJA’s \npassage would affect MISO’s pending 205 filing. Indeed, granting an extension may \nalso serve overall efficiency as, if BAAJA passes, utilities themselves may be \nrequired, or otherwise seek, to revisit or revise their filings. \n \nLocation Order and Request for Extended 60-Day Comment Period, Docket No. \nER27-531 (filed November 16, 2026). \n6 18 C.F.R. § 385.2008(a). \n7 H.R. 2347, 119th Cong. (2026)."},{"page":3,"startToken":522,"endToken":780,"text":"3 \n \nDeclining to grant an extension, by contrast, would only complicate this \nproceeding. If the extension were granted and BAAJA does not pass, the parties will \nnot have wasted significant time, and indeed, will have time to address the already \ncomplex issues presented by the status quo (see below). If, by contrast, BAAJA \npasses after the currently set 30-day comment period has closed, parties will have \nto raise issues concerning how BAAJA affects this proceeding on rehearing. Having \nto address BAAJA on rehearing is not efficient for either parties or the Commission. \nThe significant uncertainty created by the Congress’ active consideration of BAAJA \nconstitutes good cause to extend the comment period on this proceeding beyond the \nend of the current legislative session (January 3, 2027).8 \nSecond, good cause also exists to extend the deadline because the ordinary \ncomment period is insufficient to allow parties to address the many issues raised by \nthis complex and lengthy proceeding. Even absent the legal uncertainty created by \nCongress’s consideration of BAAJA, parties would benefit from additional time to \nconsider the filing and prepare their responses. MISO’s section 205 filing follows \nfrom a lengthy and complex multi-stage rulemaking process9 initiated by the United \nStates Department of Energy. This complexity is demonstrated by the fact that \n \n8 U.S. Const., 20th Amend. § 1. \n9 Advanced Notice of Proposed Rulemaking, Accession No. 20251027-4001; Notice \nInviting Comments (Oct. 27, 2025), Accession No. 20251027-3056; Letter from \nSecretary of Energy (Oct. 23, 2025), https://www.energy.gov/sites/default/files/2025-\n10/403%20Large%20Loads%20Letter.pdf."},{"page":4,"startToken":780,"endToken":1078,"text":"4 \n \nMISO and the MISO Transmission Owners sought,10 and FERC granted,11 a 90-day \nabeyance of MISO’s response deadline (August 17, 2026) under the Show Cause \nOrder.12  \nThe way in which MISO has structured its response to the Show Cause Order \nhas also introduced additional layers of complexity. Instead of filing a single \ncoherent submission responding to the Commission’s order, MISO has filed at least \nfour piecemeal 205 filings prior to, or simultaneous with, the instant matter: 1) the \nZero-Injection Generator Interconnection Agreement proposal;13 2) the Large Load \nAddition Resource Study Process;14 3) the Large Load Reliability Requirements \nfiling;15 and 4) the Grid Responsive Integration Transmission Service.16 Each of \nthese pending proposals has different requested implementation dates and \ncomment deadlines. The parties require time not only to digest the instant filing, \nbut to understand and respond to how these five filings together address, or fail to \naddress, the Commission’s Show Cause Order. \n \n10 Motion of the Midcontinent Independent System Operator, Inc. and the MISO \nTransmission Owners to Hold Proceeding in Abeyance, Accession No. 20260803-\n5249 (Aug. 3, 2026). \n11 Letter order granting MISO’s Abeyance Motion, 196 FERC ¶ 61,133 (Aug. 14, \n2026).  \n12 Midcontinent Indep. Sys. Operator, Inc., Order Instituting Proceeding Under \nSection 206 of the Federal Power Act, 95 FERC ¶ 61,212 (June 18, 2026). \n13 Midcontinent Independent System Operator, Inc.’s  Zero Injection Generator \nInterconnection Agreement, Docket No. ER26-3552 (filed August 18, 2026). \n14 Midcontinent Independent System Operator, Inc.’s Large Load Addition Resource \nStudy Process, Docket No. ER27-25 (filed October 2, 2026). \n15 Midcontinent Independent System Operator, Inc.’s Large Load Reliability \nRequirements, Docket No. ER26-3650 (filed August 28, 2026). \n16 Midcontinent Independent System Operator, Inc.’s Grid Responsive Integration \nTransmission Service, Docket No. ER27-527, (filed November 16, 2026)."},{"page":5,"startToken":1078,"endToken":1252,"text":"5 \n \nAccordingly, additional time is warranted to review MISO’s filing, evaluate \nthe issues presented, consult with relevant technical and legal personnel, and \nprepare meaningful comments for the Commission’s consideration. \nII. \nREQUEST FOR ACTION BY NOVEMBER 23, 2026 \n \n Community Organizations and Clean Energy Advocates respectfully request \nthat the Commission act on this request for extension of time by November 23, \n2026.  Action by that date is important so that the parties can best structure their \ncomments on MISO’s filing and provide as detailed and thorough comments as \npossible. \nIII. \nCONCLUSION \n \nFor the reasons given above, Community Organizations and Clean Energy \nAdvocates request that the Commission issue an order no later than November 23, \n2026, GRANTING the requested extension of time, until January 15, 2027, to \ncomment on MISO’s filing. \nDated: November 17, 2026 \n \nRespectfully Submitted,  \n \n/s/ Aaron Stemplewicz  \nAaron Stemplewicz \nSameer H. Doshi  \nChristine Powell  \nAaliyah Adkins \nAda Statler  \nEarthjustice  \n1617 John F. Kennedy Blvd., Suite 2020 \nPhiladelphia, PA 19103 \nastemplewicz@earthjustice.org  \nsdoshi@earthjustice.org  \ncpowell@earthjustice.org  \naadkins@earthjustice.org \nastatler@earthjustice.org"},{"page":6,"startToken":1252,"endToken":1376,"text":"6 \n \n \nAttorneys for Michigan Environmental \nJustice Coalition and Community \nCollaboration on Climate Change  \n \nKareem Scales  \nCo-Chair  \nCommunity Collaboration on Climate \nChange  \nGrand Rapids, MI  \nkareem@c4gr.org  \n \nWesley Watson  \nPolicy Associate  \nMichigan Environmental Justice Coalition  \n1401 W. Fort St., P.O. Box 44080  \nDetroit, MI 48233  \nwesley@michiganej.org \n \n/s/ Daniel Wiggins Jr.   \nDaniel Wiggins Jr.  \nExecutive Director  \nMidwest Tribal Energy Resources \nAssociation  \n3136 W. Kilbourn Ave., Suite 200  \nMilwaukee, WI 53208  \ndaniel.wiggins@mtera.org \n \n/s/ Natalie McIntire   \nNatalie McIntire  \nSenior Advocate  \nSustainable FERC Project \n20 North Wacker Drive, Suite 1600  \nChicago, IL 60606  \n(312) 995-5907  \nnmcintire@nrdc.org \n \n/s/ Anna Markowski \nAnna Markowski  \nDirector, Midwest   \nClimate and Clean Energy  \nNatural Resources Defense Council   \n20 North Wacker Drive, Suite 1600   \nChicago, IL 60606"},{"page":7,"startToken":1376,"endToken":1445,"text":"7 \n \n312-651-7927  \namarkowski@nrdc.org \n \n/s/ Beth Soholt   \nBeth Soholt  \nExecutive Director  \nClean Grid Alliance  \n3433 Broadway St. NE, Suite 240  \nMinneapolis, MN 55413  \nbsoholt@cleangridalliance.org   \n \n/s/ Mike Schowalter \nManaging Director, Transmission Policy \nFresh Energy \n408 Saint Peter Street, Suite 350 \nSaint Paul, MN 55102 \n(612) 433-3648 \nschowalter@fresh-energy.org \n \n/s/ Justin Vickers \nJustin Vickers \nSenior Attorney \nSierra Club \nChicago, IL \n224.420.0614 \njustin.vickers@sierraclub.org"},{"page":8,"startToken":1445,"endToken":1506,"text":"8 \n \nCERTIFICATE OF SERVICE \n \nI hereby certify that the foregoing has been served in accordance with 18 \nC.F.R. § 385.2010 upon each party designated on the official service list in this \nproceeding by email.  \nDated: November 17, 2026  \n \n \n \n \n \n \n \n/s/ Aaron Stemplewicz  \nAaron Stemplewicz  \nEarthjustice \nSenior Attorney \n1617 John F. Kennedy Blvd., Suite 2020 \nPhiladelphia, PA 19103 \nastemplewicz@earthjustice.org"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":254,"startToken":0,"endToken":334},{"p":2,"at":254,"title":"I. GOOD CAUSE EXISTS TO GRANT AN EXTENSION","method":"printed heading","endPage":5,"endAt":601,"startToken":334,"endToken":1165},{"p":5,"at":601,"title":"III. CONCLUSION","method":"printed heading","endPage":8,"endAt":5,"startToken":1165,"endToken":1446},{"p":8,"at":5,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":8,"endAt":421,"startToken":1446,"endToken":1506}]}