{"document":{"slug":"rec-20261118-5252","title":"Enhance Transmission Service for HILLs and Non-Transmission Facilities","issued":"2026-11-18","accession":"20261118-5252","docket":"ER27-559-000","group":"SPP large-load tariff revisions","filer":"Southwest Power Pool, Inc.","kind":"tariff filing","file":"sources/filings/text/20261118-5252_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261118-5252","tier":"record","sha256":"f098c035ca6677e3d6f7454ead1335ba2954559e6dbb0b7325675c804d0095cd","pages":26,"tokens":9144,"emptyPages":[],"textThemes":["study","colo","cost","procedure"]},"pages":[{"page":1,"startToken":0,"endToken":408,"text":"November 18, 2026 \n \nThe Honorable Debbie-Anne A. Reese \nSecretary \nFederal Energy Regulatory Commission \n888 First Street, N.E. \nWashington, D.C.  20426 \n \nRe: \nSouthwest Power Pool, Inc., Docket No. ER27-____-000 \nSubmission of Tariff Revisions to Enhance Transmission Service \nProvisions for High Impact Large Loads and Clarify Interconnection \nand Market Registration Requirements for Non-Transmission Facilities \nin Response to Show Cause Order; Related to Docket No. EL26-68-000 \n \nDear Secretary Reese:  \n \n \nPursuant to Section 205 of the Federal Power Act (“FPA”), 16 U.S.C. § 824d, \nand Section 35.13 of the Federal Energy Regulatory Commission’s (“Commission”) \nRegulations, 18 C.F.R. § 35.13, Southwest Power Pool, Inc. (\"SPP\"), as authorized by \nits independent Board of Directors, submits revisions to its Open Access Transmission \nTariff (“Tariff”)1 in response to the Commission’s June 18, 2026, order instituting a \nproceeding under FPA Section 206 in Docket No. EL26-68-000 (“Show Cause \nOrder”).2 The proposed revisions fall into two related sets. The first set (the “HILL \nTransmission Service Revisions”): (1) requires SPP to evaluate alternative \ntransmission technologies when studying transmission service for High Impact Large \nLoads (“HILLs”);3 (2) memorializes the ongoing operational requirements applicable \n \n1  \nSouthwest Power Pool, Inc., Open Access Transmission Tariff, Sixth Revised Volume \nNo. 1.  References in this filing to \"Tariff\" refer to the version of SPP’s Tariff currently \nin effect. \"Proposed Tariff\" refers to a version reflecting the revisions proposed in this \nfiling. All capitalized terms not otherwise defined in this filing shall have the \ndefinitions assigned by the Tariff. \n2  \nSw. Power Pool, Inc., 195 FERC ¶ 61,213 (2026) (“Show Cause Order”). \n3  \nTariff, Part I, Section 1, Definition of High Impact Large Load (“A new commercial \nor industrial load, or increase in commercial or industrial load, at a single site \nconnected through one or more shared Points of Interconnection (POIs) or delivery \npoints, where such load is either (1) 10 MW or more if connected to the Transmission \nSystem at a voltage level less than or equal to 69 kV; or (2) 50 MW or more if \nconnected to the Transmission System at a voltage level greater than 69 kV. An \nElectric Storage Resource is not considered a HILL. A load may be categorized as a \nHILL after the initial effective date of Attachment BA of the Tariff.  High Impact Large \nLoads must register as such in accordance with Attachment AE of the Tariff and follow \nthe processes specified in Attachment BA of the Tariff.”)."},{"page":2,"startToken":408,"endToken":816,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 2 \n \nto HILLs in the pro forma transmission service agreements; and (3) provides \ntransparency regarding the Network Upgrades, and associated costs, needed to serve \nHILLs. The second set (the “Non-Transmission Facility Revisions”): (1) defines a new \nterm, “Non-Transmission Facility,” that replaces the undefined “non-jurisdictional” \nterminology; (2) clarifies the interconnection study requirements for generation \ninterconnecting to Non-Transmission Facilities, including Behind-The-Meter \nGeneration and on-site co-located generation; and (3) clarifies which party is \nresponsible for market registration when a Resource fails or refuses to register in the \nIntegrated Marketplace. Together, the HILL Transmission Service Revisions and the \nNon-Transmission Facility Revisions are referred to as the “Large Load Revisions.” \nBecause both sets address how large loads, and the generation that serves them, connect \nto and use the Transmission System, SPP submits them in a single filing so the \nCommission can evaluate them together. As directed by the Show Cause Order, SPP \nstates explicitly that this proposal is submitted under FPA Section 205, and SPP \nexplains below which of the Commission’s Show Cause Order directives this filing \naddresses, how it resolves them, and, in Sections IV and V, how the proposal avoids \ndisrupting existing commercial arrangements and why the requested effective date is \nreasonable.4 \n \nSPP respectfully requests that the Commission issue an order finding the \nproposed revisions just and reasonable and not unduly discriminatory or preferential, \naccepting them effective February 16, 2027, and finding that they resolve the concerns \nidentified in Directive (1)(a), the transparency component of Directive (1)(b), and the \nclarity, interconnection, and market participation components of Directive (1)(c) of the \nShow Cause Order. \n \nI. \nSUMMARY OF FILING  \nIn the Show Cause Order, the Commission commended SPP’s “bold and \nproactive steps” to integrate large loads.5 The Commission recognized that SPP’s HILL \nprocess already provides an enhanced study framework for Eligible Customers taking \ntransmission service on behalf of large loads.6 Given those enhancements, the \nCommission stated that it expects SPP will be able to demonstrate that it has resolved \nseveral of the concerns the Commission has identified regarding a lack of clarity and \nconsistency in other regions’ tariffs.7 The Commission nonetheless found that the HILL \nprocess lacks two components: (1) provisions requiring the evaluation of alternative \ntransmission technologies; and (2) pro forma service agreement provisions \n \n4 \nShow Cause Order at P 32. \n5  \nId. at P 2.  \n6  \nId.; see also id. at P 43. \n7  \nId."},{"page":3,"startToken":816,"endToken":1136,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 3 \n \nmemorializing ongoing operational requirements.8 The Commission also preliminarily \nfound that the Tariff does not require centralized, accessible data on the Network \nUpgrades and associated costs needed to serve large loads,9 and that the Tariff lacks \nsufficient clarity and consistency regarding the rates, terms, and conditions of service \nthat apply to interconnection customers serving co-located load, including how those \ncustomers may use SPP’s generator interconnection processes, the scope of SPP’s \nstudy of co-location arrangements, and the responsibilities of the entities involved.10  \nThe Large Load Revisions close each of these gaps, as summarized below: \n \nShow Cause \nOrder directive \nCommission’s concern \nTariff revision \nHILL Transmission Service Revisions (RR808) \nDirective (1)(a), \nfirst component (PP \n44–45) \nEvaluation of alternative \ntransmission technologies \nin all instances, without a \ncustomer request, and a \nclear demonstration in the \nstudy report if traditional \nNetwork Upgrades are \nselected \nNew provisions in Attachment \nBA, Section 2.1.3.4 requiring \nevery HILL Delivery Point \nStudy (“HDPS”) to evaluate \ngrid-enhancing technologies \n(“GETs”) and requiring the \nHDPS report to explain the \nresults of that evaluation \nDirective (1)(a), \nsecond component \n(P 46) \nPro forma transmission \nservice agreement \nprovisions memorializing \nongoing HILL operational \nrequirements \nNew Section 6.0 of the \nAttachment A Firm Point-to-\nPoint Service Agreement and \nnew Section 3.0 of the \nAttachment F Network \nIntegration Transmission \nService (“NITS”) Agreement, \nwhich bind the Transmission \nCustomer or Network Customer \nto Attachment BA, Section 2.2. \nBoth agreements also gain \nfields to identify delivery points \nthat include a HILL \nDirective (1)(b), \ntransparency \ncomponent (PP 52–\n58) \nData in a single location \non SPP’s website, \nsearchable and filterable, \non Network Upgrades \nAttachment O, Section V \nrequires the SPP Transmission \nExpansion Plan (“STEP”) to be \npublicly available in a \n \n8  \nId. at PP 35, 43. \n9  \nId. \n9  \nId. at PP 52, 58. \n10  \nId. at PP 75–76, 78–79."},{"page":4,"startToken":1136,"endToken":1414,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 4 \n \nShow Cause \nOrder directive \nCommission’s concern \nTariff revision \nneeded to serve large \nloads and their costs \nsearchable and filterable format. \nAttachment BA, Section 2.1.3.6 \nrequires the Host Transmission \nOwner to provide the Network \nUpgrades and costs for HILL \ndelivery points for inclusion in \nthe STEP \nNon-Transmission Facility Revisions (RR805) \nDirective (1)(c), \nclarity component \n(PP 75–76) \nClear, consistent \nterminology identifying \nthe facilities to which co-\nlocated and Behind-The-\nMeter Generation connect \nNew defined term “Non-\nTransmission Facility” in \nAttachment V, Section 1, \nAttachment AY, Section II, and \nAttachment BB, Section 1. \nRevised definitions of \n“Affected System \nInterconnection Customer,” \n“Affected System Study,” and \n“Transmission System” \nDirective (1)(c), \ninterconnection \ncomponent (PP 76, \n78–80) \nWhen generation on \nfacilities outside the \nTransmission System is \nsubject to SPP’s \ninterconnection study \nrequirements \nAttachment V, Section 9.1 and \nAttachment AY, Section V.9.1 \npoint to the study requirements \nand criteria in Business Practice \n7250, Section 6. Attachment \nBB, Section 3.1.3(4) routes \nHigh Impact Large Load \nGeneration Assessment \n(“HILLGA”) requests on Non-\nTransmission Facilities to that \nsame process \nDirective (1)(c), \nmarket \nparticipation \ncomponent (P 76) \nWhen such generation \nmust register in the \nIntegrated Marketplace, \nand who is responsible \nAttachment AE, Section 2.2(6) \nidentifies the party under whose \nname an unexecuted service \nagreement will be filed when a \nResource fails or refuses to \nregister, including the Market \nParticipant representing the load \nfor Behind-The-Meter \nGeneration \n \nThis filing is one part of SPP’s comprehensive response to the Show Cause \nOrder. The other directives are addressed in separate filings, as discussed in Section \nIII.E below."},{"page":5,"startToken":1414,"endToken":1778,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 5 \n \nII. \nBACKGROUND \nA. \nThe HILL Process  \n \nOn January 14, 2026, the Commission accepted SPP's Tariff revisions \nestablishing the HILL study process in Attachment BA and the HILLGA process in \nAttachment BB.11 Those revisions (1) defined HILLs as a new category of load; (2) \nestablished enhanced study requirements for HILLs, including the HDPS, to enable \nSPP to assess the reliability impacts of a HILL on the Transmission System; and (3) \nimposed ongoing operational requirements on HILLs to ensure the continued reliable \noperation of the Transmission System. Those operational requirements, in Attachment \nBA, Section 2.2, include: compliance with non-conforming load requirements; real-\ntime telemetry; remote disconnect capability; a ramp-rate limitation; phasor \nmeasurement unit installation; ride-through requirements; and a prohibition on \nwithdrawals without appropriate transmission service.12 The Commission found the \nHILL process to be “a just and reasonable approach for integrating transmission \ncustomers’ new large loads onto SPP’s transmission system in a reliable manner.”13 \n \nB. \nGenerator Interconnections to Facilities Outside the Transmission \nSystem  \n \nAttachments V and AY of the Tariff govern interconnection to SPP’s \nTransmission System.14 Those Attachments also include Affected System Study \nprocedures for proposed interconnections to other transmission systems that may affect \nSPP’s Transmission System.15 Some generation is Behind-The-Meter Generation, co-\nlocated on-site, or connected to distribution or other facilities that are not part of the \nTransmission System. SPP currently addresses that type of generation through \nBusiness Practice 7250, which uses \"non-jurisdictional\" terminology. The Tariff does \nnot define that term or use it consistently. As a result, the Tariff does not clearly state \nwhen such generation will be studied for its impact on the Transmission System, by \nwhom, or through which study process. Nor does it identify the responsible party when \nsuch generation fails to register in the Integrated Marketplace and is not subject to an \ninterconnection agreement with the Transmission Provider or a Transmission Owner. \n \n \n \n \n11  \nSw. Power Pool, Inc., 194 FERC ¶ 61,031 (2026) (“HILL Order”). \n12  \nTariff, Attachment BA, Section 2.2. \n13  \nHILL Order at P 61. \n14  \nTariff, Attachments V and AY. \n15 \nTariff, Attachment V, Section 9; Tariff, Attachment AY, Section V.9."},{"page":6,"startToken":1778,"endToken":2102,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 6 \n \nC. \nThe Show Cause Order  \n \nFor purposes of the Show Cause Order, the Commission adopted SPP’s \ndefinition of “large load.”16 The Commission preliminarily found that the Tariff \nappears unjust and unreasonable in four categories. The Commission directed SPP and \nthe Transmission Owners either to show cause why the Tariff remains just and \nreasonable or to explain what changes would remedy the identified concerns.17 The \nCommission strongly encouraged SPP to address these issues through FPA Section 205 \nfilings.18 \n \nD.  \nAbeyance  \n \nOn August 3, 2026, SPP moved to hold Docket No. EL26-68-000 in abeyance \nthrough November 20, 2026, so SPP could develop Section 205 filings through its \nstakeholder process.19 SPP described the anticipated content of those filings in its \nAbeyance Motion, including the revisions submitted here.20 On August 14, 2026, the \nCommission granted the Abeyance Motion and set a due date of November 20, 2026, \nfor SPP’s response to the Show Cause Order.21  \n \nE. \nStakeholder Process and Approval  \n \nThe HILL Transmission Service Revisions (RR808) were reviewed and \napproved without opposition through SPP’s robust stakeholder process, including \nmeetings of the Project Cost Working Group (“PCWG”) on September 28, 2026;22 \n \n16  \nShow Cause Order at n.2. \n17  \nId. at P 3. \n18  \nId. at P 32. \n19  \nJoint Movants’ Amended Motion to Hold Section 206 Proceeding in Abeyance of \nSouthwest Power Pool, Inc., et al., Docket No. EL26-68-000 (Aug. 3, 2026) \n(“Abeyance Motion”). \n20  \nId. at Section IV. \n21  \nSw. Power Pool, Inc., 196 FERC ¶ 61,128 (2026) (“Abeyance Order”). \n22  \nSee PCWG Minutes, dated September 28, 2026, at Agenda Item 2A posted at: \nhttps://spp.org/documents/77912/pcwg%20special%20meeting%20minutes%202026\n0928.pdf. The PCWG provides stakeholder input, oversight and accountability that \nallows for a transparent review of transmission project cost variances. The PCWG \nevaluates projects that exceed allowable variance levels and provides quarterly reports \nto stakeholders."},{"page":7,"startToken":2102,"endToken":2347,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 7 \n \nTransmission Working Group (“TWG”) on September 29, 2026;23 Economic Studies \nWorking Group (“ESWG”) on October 1, 2026;24 Regional Tariff Working Group \n(“RTWG”) on October 7, 2026;25 Market Working Group (“MWG”) on October 7, \n \n23  \nSee TWG Minutes, dated September 29, 2026, at Agenda Item 5 posted at: \nhttps://www.spp.org/documents/77977/twg%20meeting%20minutes%202026\n0929.pdf. The TWG develops and oversees regional and interregional transmission \nplanning processes, including generator interconnection and long-term transmission \nservice study processes. The TWG reviews proposed transmission interconnections \nand coordinates transmission planning activities to develop SPP’s Integrated \nTransmission Plan and Transmission Expansion Plan. \n24  \nSee ESWG & TWG Joint Meeting Minutes, dated September 30-October 1, 2026, at \nAgenda Item 10 posted at: \n \nhttps://www.spp.org/documents/77985/joint%20eswg-\ntwg%20meeting%20minutes%2020260930-1001.pdf. The ESWG advises and assists \nSPP staff in determining the appropriate data, planning methods and processes for \ndeveloping and evaluating economic transmission expansion options for the SPP \nregion.     \n25  \nSee RTWG Approval, dated October 7, 2026, at RR808 Recommendation Report  \nposted at: https://www.spp.org/spp-documents-filings/?id=21069 (contained in zip file \n“RR808 (SIR879) Transmission Service to Hill Impact Large Load”). The RTWG \ndevelops, implements and oversees SPP’s Open Access Transmission Tariff. The \nRTWG provides input on regulatory or implementation issues not specifically covered \nby the tariff and issues where there may be conflicting or differing interpretations of \nthe tariff."},{"page":8,"startToken":2347,"endToken":2709,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 8 \n \n2026;26 Operating Reliability Working Group (“ORWG”) on October 8, 2026;27 and \nthe Markets and Operations Policy Committee (“MOPC”) on October 13-14, 2026.28  \n \nThe Non-Transmission Facility Revisions (RR805) were also reviewed and \napproved through SPP’s stakeholder process, including meetings of the Generation \nInterconnection Advisory Group (“GIAG”) on September 16, 2026;29 ESWG on \n \n26  \nSee MWG Approval, dated October 7, 2026, at RR808 Recommendation Report posted \nat: https://www.spp.org/spp-documents-filings/?id=21069 (contained in zip file \n“RR808 (SIR879) Transmission Service to Hill Impact Large Load”). The MWG \ndevelops and oversees policies and procedures related to the Market Protocols that \ndefine SPP’s wholesale markets, including energy and operating reserve, congestion \nmanagement, congestion hedging, demand response and market power mitigation. The \nMWG proposes changes to the SPP Tariff and other governing documents to \nimplement suggested market changes. \n27  \nSee ORWG Approval, dated October 8, 2026, at RR808 Recommendation Report \nposted at: https://www.spp.org/spp-documents-filings/?id=21069 (contained in zip file \n“RR808 (SIR879) Transmission Service to Hill Impact Large Load”). The ORWG \ndevelops and oversees policies and procedures related to the reliable and secure \noperation of the Bulk Electric System within SPP’s Reliability Coordinator, Balancing \nAuthority and Reserve Sharing Group footprints. The ORWG ensures these operating \npolicies are consistent with North American Electric Reliability Corporation and \nregional reliability standards. \n28  \nSee MOPC Meeting Minutes, dated October 13-14, 2026, at Agenda Item 3.c posted \nat: https://www.spp.org/spp-documents-filings/?id=532303. The MOPC consists of a \nrepresentative officer or employee from each SPP Member and reports to the SPP \nBoard of Directors. Its responsibilities include recommending modifications to the \nTariff. See Southwest Power Pool, Inc., Bylaws, First Revised Volume No. 4 \n(\"Bylaws\") at Section 6.1.  \n29  \nSee GIAG Meeting Minutes, dated September 16, 2026, at Agenda Item 2b posted at: \nhttps://spp.org/documents/77873/giag%20meeting%20minutes%2020260916.pdf. \nThe GIAG shares information and gathers feedback related to SPP’s generation \ninterconnection (GI) studies. The GIAG relies on the collective knowledge of \ninterested GI customers and stakeholders to assist in developing recommendations to \nimprove SPP’s GI services."},{"page":9,"startToken":2709,"endToken":3162,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 9 \n \nSeptember 21, 2026;30 TWG on September 21, 2026;31 MWG on October 7, 2026;32 \nthe RTWG on October 7, 2026;33 and MOPC on October 13-14, 2026.34  \n \nWhile SPP recognizes that stakeholder approval does not by itself cause a filing \nto be just and reasonable, SPP requests that the Commission extend appropriate \ndeference to SPP’s stakeholder process, consistent with Commission precedent.35 \n \n30  \nSee ESWG & TWG Joint Meeting Minutes, dated September 21, 2026, at Agenda Item \n3 \nposted \nat: \nhttps://spp.org/documents/77884/joint%20eswg-\ntwg%20meeting%20minutes%2020260921.pdf. The ESWG advises and assists SPP \nstaff in determining the appropriate data, planning methods and processes for \ndeveloping and evaluating economic transmission expansion options for the SPP \nregion. The TWG develops and oversees regional and interregional transmission \nplanning processes, including generator interconnection and long-term transmission \nservice study processes. The TWG reviews proposed transmission interconnections \nand coordinates transmission planning activities to develop SPP’s Integrated \nTransmission Plan and Transmission Expansion Plan.  \n31  \nId.  \n32  \nSee MWG Approval, dated October 7, 2026, at RR805 Recommendation Report posted \nat: https://www.spp.org/spp-documents-filings/?id=21069 (contained in zip file \n“RR805 (SIR879) Non-Transmission Facilities”). The MWG develops and oversees \npolicies and procedures related to the Market Protocols that define SPP’s wholesale \nmarkets, including energy and operating reserve, congestion management, congestion \nhedging, demand response and market power mitigation. The MWG proposes changes \nto the SPP Tariff and other governing documents to implement suggested market \nchanges. \n33  \nSee RTWG Approval, dated October 7, 2026, at RR805 Recommendation Report  \nposted at: https://www.spp.org/spp-documents-filings/?id=21069 (contained in zip file \n“RR805 (SIR879) Non-Transmission Facilities”). The RTWG develops, implements \nand oversees SPP’s Open Access Transmission Tariff. The RTWG provides input on \nregulatory or implementation issues not specifically covered by the tariff and issues \nwhere there may be conflicting or differing interpretations of the tariff. \n34  \nSee MOPC Meeting Minutes, dated October 13-14, 2026, at Agenda Item 3.b posted \nat: https://www.spp.org/spp-documents-filings/?id=532303. The MOPC consists of a \nrepresentative officer or employee from each SPP Member and reports to the SPP \nBoard of Directors. Its responsibilities include recommending modifications to the \nTariff. See Southwest Power Pool, Inc., Bylaws, First Revised Volume No. 4 \n(\"Bylaws\") at Section 6.1.  \n35   \nThe Commission has previously recognized that provisions approved through regional \ntransmission organization stakeholder processes are due deference. See Sw. Power \nPool, Inc., 127 FERC ¶ 61,283, at P 33 (2009) (noting that the Commission “accord[s] \nan appropriate degree of deference to RTO stakeholder processes”); New Eng. Power \nPool, 105 FERC ¶ 61,300, at P 34 (2003) (Commission approval of transmission cost"},{"page":10,"startToken":3162,"endToken":3598,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 10 \n \n \nIII. \nDESCRIPTION OF AND JUSTIFICATION FOR THE LARGE LOAD \nREVISIONS \n \nThe Large Load Revisions respond to the gaps the Commission identified and \nbuild on a framework the Commission has already found just and reasonable. They \napply uniformly to all similarly situated customers and advance the Commission’s \nstated objectives of protecting consumers from unnecessary costs, safeguarding \nreliability, and improving transparency and consistency for customers, Transmission \nOwners, Market Participants, and federal and state regulators. III.A through III.C \ndescribe the HILL Transmission Service Revisions, Section III.D describes the Non-\nTransmission Facility Revisions, and Section III.E identifies the directives SPP is \naddressing in separate filings. \n \nUnder FPA Section 205, SPP must show that its proposal is just and reasonable. \nIt need not show that the proposal is the only reasonable approach or that it is more \nreasonable than the alternatives.36 As Commissioner LaCerte observed, FPA Section \n205 provides a “relatively capacious standard” under which the Commission may \naccept a broad range of proposals shown to be just and reasonable and not unduly \ndiscriminatory or preferential.37 The Large Load Revisions meet that standard. For each \nconcern the Commission identified, SPP: \n \n1. places in the Tariff the binding obligation the Commission found missing; \n2. ties that obligation to an existing process the Commission has already accepted \n(the HDPS, the pro forma service agreements, the STEP, the Affected System \nStudy framework, and the Attachment AE registration requirements) instead of \ncreating a parallel process; and \n3. places implementation details, such as technology-specific evaluation methods \nand size- and impact-based study thresholds, in Business Practices that are \ndeveloped and revised through SPP's stakeholder process. \n \nallocation proposal based upon an extensive and thorough stakeholder process); Policy \nStatement Regarding Regional Transmission Groups, 1991-1996 FERC Stats. & \nRegs., Regs. Preambles ¶ 30,976, at 30,872 (1993) (the Commission will afford the \nappropriate degree of deference to the stakeholder approval process). The \nCommission’s deference to RTO stakeholder processes has been upheld by the courts. \nSee Pub. Serv. Comm’n of Wis. v. FERC, 545 F.3d 1058, 1062-63 (D.C. Cir. 2008) \n(noting that the Commission often gives weight to RTO proposals that reflect the \nposition of the majority of the RTO’s stakeholders) (quoting Am. Elec. Power Serv. \nCorp. v. Midwest Indep. Transmission Sys. Operator, Inc., 122 FERC ¶ 61,083, at P \n172 (2008)). \n36  \nSee, e.g., Cities of Bethany v. FERC, 727 F.2d 1131, 1136 (D.C. Cir. 1984); OXY USA, \nInc. v. FERC, 64 F.3d 679, 692 (D.C. Cir. 1995). \n37  \nShow Cause Order (LaCerte, Comm’r, concurring) at P 6."},{"page":11,"startToken":3598,"endToken":3989,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 11 \n \n \nThis structure follows the Commission's rule of reason. Under that policy, a \ntariff must include practices that significantly affect rates, terms, and conditions of \nservice, are realistically susceptible of specification, and are not so generally \nunderstood in contractual arrangements that stating them would be superfluous. \nImplementation details that do not meet that test may be placed in business practices.38 \nThe Large Load Revisions divide the material along that line. The Tariff sets out each \nbinding obligation and references the applicable Business Practices that govern how \nSPP carries it out. The Business Practices supply the technical and procedural detail \nneeded to carry out obligations the Tariff imposes. The Commission applied this same \nstandard in the Show Cause Order itself, focusing on responsibilities that “may \nsignificantly affect rates and are realistically susceptible of specification.”39 \n \nA. \nEvaluation of Alternative Transmission Technologies (Directive \n(1)(a), First Component) \n \n \n1. \nCommission Concern \n \nThe Commission preliminarily found that the Tariff lacks clear and consistent \nprovisions requiring the evaluation of alternative transmission technologies as potential \nsolutions to accommodate a request for transmission service on behalf of a large load.40 \nThe Commission noted three points: (1) these technologies can often add capacity on \nexisting lines within one to three years; (2) large load development timelines frequently \noutpace traditional Network Upgrades; and (3) when large load driven Network \nUpgrade costs are rolled into transmission revenue requirements, other transmission \ncustomers may bear a portion of those costs.41 The Commission directed SPP to address \nprovisions that would (1) require the evaluation of alternative transmission \ntechnologies “in all instances, without the need for a request from the Eligible \nCustomer”; and (2) if traditional Network Upgrades are selected, include in the study \nreport a sufficiently clear demonstration of why those technologies are not feasible or \n \n38  \nCity of Cleveland v. FERC, 773 F.2d 1368, 1376 (D.C. Cir. 1985); Hecate Energy \nGreene Cnty., 3 LLC v. FERC, 72 F.4th 1307, 1312 (D.C. Cir. 2023); Prior Notice & \nFiling Requirements Under Part II of the Fed. Power Act, 64 FERC ¶ 61,139, at 61,989 \n(1993); see also Show Cause Order at P 76 & n.150. \n39  \nShow Cause Order at P 76 & n.150. \n40  \nShow Cause Order at P 44; see also id. at P 35. \n41  \nId."},{"page":12,"startToken":3989,"endToken":4296,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 12 \n \nwould not result in lower costs or a faster timeline.42 The Commission emphasized that \nit was “not mandating the use of alternative transmission technologies.”43 \n \n \n \n2. \nProposed Revisions \n \nSPP proposes to add the following to Attachment BA, Section 2.1.3.4:  \n \nThe HDPS will evaluate the appropriateness of the use \nof grid enhancing technologies (“GETs”) as described in \nthe SPP Business Practices. The Transmission Provider \nwill determine whether one or more GETs should be \nidentified as a solution(s) to needs determined in the \nHDPS, consistent with Good Utility Practice, Applicable \nReliability Standards, and other Applicable Laws and \nRegulations. The HDPS report will include an \nexplanation of the results of the Transmission Provider’s \nevaluation of GETs.44 \nThis revision addresses the Commission’s concerns regarding evaluation of \nalternative transmission technologies as potential solutions to accommodate a request \nfor transmission service on behalf of a large load. First, Section 2.1.3.4 of Attachment \nBA of the Proposed Tariff requires evaluation of GETs in all instances.45 Under \nAttachment BA, SPP performs an HDPS for every requested HILL delivery point \nchange.46 The proposed new language says the HDPS “will evaluate” GETs, making \nthe evaluation mandatory for every HDPS study.47 The evaluation of GETs, therefore, \ndoes not depend on a request from the Transmission Customer or Network Customer.48 \nBecause the Commission adopted the HILL definition as its definition of “large load,” \nthe evaluation covers every transmission service request within the scope of the Show \nCause Order.49 \n \n \n42  \nId. at P 45. \n43  \nId. \n44  \nProposed Tariff, Attachment BA, Section 2.1.3.4. \n45  \nId. \n46  \nTariff, Attachment BA, Section 2.1.3.4. \n47  \nProposed Tariff, Attachment BA, Section 2.1.3.4.  \n48  \nId.  \n49  \nShow Cause Order at n.2."},{"page":13,"startToken":4296,"endToken":4662,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 13 \n \nSecond, the evaluation covers the technologies the Commission identified. In \nfootnote 14, the Show Cause Order lists the alternative transmission technologies the \nCommission had in mind: static synchronous compensators, static VAR compensators, \nadvanced power flow control devices, transmission switching, synchronous \ncondensers, voltage source converters, advanced conductors, tower lifting, and \ndynamic line ratings.50 SPP Business Practice 7850, referenced in Attachment BA, \nevaluates each of these nine technologies and explains how SPP applies them to the \ntypes of constraints that large loads typically create.51 Although the Proposed Tariff \nuses the term “GETs,” Business Practice 7850 applies that term to all nine technologies \nthe Commission identified, including advanced conductors and tower lifting, so the \nevaluation is not limited to a narrower set of grid-enhancing devices. The Commission \nlikewise noted that it has referred to these technologies as GETs.52 The HDPS \nevaluation uses models and study tools capable of representing the applicable \ncharacteristics of each technology identified in Business Practice 7850, consistent with \nthe Commission's direction that the evaluation use models capable of accurately \naccounting for advanced transmission technologies.53 Depending on the constraint \nidentified, SPP uses steady-state power flow, short-circuit, RMS/transient stability, \nand, when necessary, electromagnetic transient (\"EMT\") analyses. SPP uses PSS®E \nand TSAT™ for power flow and RMS dynamic studies, and PSCAD™ for detailed \nEMT studies. Each technology is represented in a way that fits it: \n \n• \nReactive supports including synchronous condenser, static synchronous \ncompensators, and static VAR compensators; advanced power flow control, \nand VSC-HVDC facilities: power flow, short circuit, and dynamic models;  \n• \nTransmission switching: topology changes \n• \nAdvanced conductors and tower lifting: updated equipment parameters and \nratings \n• \nDynamic line ratings: condition-dependent thermal ratings \n \nThe models and analyses used in a given HDPS depend on the identified \nconstraint, the validated model data and supporting technical information available, and \nthe level of detail needed to determine whether the technology provides reliable \nmitigation. Where sufficient validated models or supporting data are unavailable, the \nHDPS report will explain how that limitation affected the evaluation. \n \n \n50  \nId. at n.14. \n51  \nSee Business Practice 7850, Section A. \n52  \nShow Cause Order at n.14. \n53  \nId. at P 45."},{"page":14,"startToken":4662,"endToken":5001,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 14 \n \nThird, Section 2.1.3.4 of Attachment BA of the Proposed Tariff requires that \nthe HDPS report include an explanation of the results of SPP’s GETs evaluation.54 \nBusiness Practice 7850 requires each HDPS report to explain the results for each \nidentified technology and provides a model format that documents, technology by \ntechnology, whether the technology was selected, was less cost-effective than the \nselected mitigation, could not resolve the identified constraint, or was screened out for \na stated technical reason.55 This provides the Eligible Customer the transparency the \nCommission called for in the Show Cause Order.56 Specifically, where SPP selects \ntraditional Network Upgrades, the HDPS report will explain, technology by \ntechnology, whether the alternative technology would not resolve the identified \nreliability need, would not result in lower costs, or would not provide a faster timeline. \n \nFinally, the revisions respect engineering judgment and do not mandate GETs. \nAs the Commission directed, the revisions require evaluation, not deployment.57 Under \nthe proposed language, SPP selects a GET only when doing so is consistent with Good \nUtility Practice, Applicable Reliability Standards, and other Applicable Laws and \nRegulations.58 This protects reliability for existing customers while ensuring cost-\neffective, faster solutions are not overlooked and is consistent with the Commission’s \nstatement that it is not mandating the use of alternative transmission technologies, as \nwell as the goal, articulated in Commissioner See’s concurrence, of respecting \ntransmission providers’ engineering judgments while protecting against unnecessary \nupgrade costs.59 By requiring SPP to consider lower-cost and faster-to-deploy \nalternatives before selecting traditional Network Upgrades, the proposed revision also \naddresses the Commission’s concern that large load driven Network Upgrade costs \nrolled into transmission revenue requirements may be borne in part by other \ntransmission customers. \n \n \n \n54  \nProposed Tariff, Attachment BA, Section 2.1.3.4. \n55  \nBusiness Practice 7850, Section C. \n56  \nShow Cause Order at P 45. \n57  \nId. \n58  \nProposed Tariff, Attachment BA, Section 2.1.3.4. \n59  \nShow Cause Order at P 45."},{"page":15,"startToken":5001,"endToken":5363,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 15 \n \nB. \nPro Forma Service Agreement Provisions Memorializing Ongoing \nOperational Requirements (Directive (1)(a), Second Component) \n \n \n \n1. \nCommission Concern  \n \n \nThe Commission found that, although the Tariff includes ongoing operational \nrequirements for HILLs, the HILL process does not include pro forma provisions in a \ntransmission service agreement that memorialize them.60 Without such provisions, the \nCommission was concerned that SPP “may be unable to enforce ongoing operational \nrequirements.”61 \n \n \n \n2. \nProposed Revisions  \n \nSPP proposes the following revisions addressing the Commission’s concerns \nwith respect to operational requirements. Section 6.0 of Attachment A of the Proposed \nTariff (Form of Service Agreement for Firm Point-to-Point Transmission Service) \nprovides that, if any portion of the load receiving Firm Point-to-Point Transmission \nService under the Service Agreement is a HILL, the Transmission Customer must \nsatisfy the Additional Requirements for High Impact Large Loads in Attachment BA, \nSection 2.2 for each HILL.62 The Specifications for Long-Term Firm Point-to-Point \nTransmission Service add a field to identify which Point(s) of Delivery include \nHILLs.63 Similarly, new Section 3.0 of the Specifications for Network Integration \nTransmission Service (Attachment 1 to the Network Integration Transmission Service \nAgreement in Attachment F of the Proposed Tariff), provides that, if any portion of the \nNetwork Customer’s Network Load listed in Appendix 3 is a HILL, the Network \nCustomer must satisfy the Additional Requirements for HILLs for each such load as \nrequired by Attachment BA, Section 2.2.64 Appendix 3 (Delivery Points) adds a column \nshowing whether each delivery point includes a HILL and, if so, the effective date.65 \nSPP incorporates the Attachment BA, Section 2.2 requirements by reference rather than \nrestating them. The requirements therefore stay uniform across all customers, and any \nfuture Commission-accepted change to Attachment BA, Section 2.2 flows \nautomatically into every service agreement without amending each one. \n \n60  \nId. at P 46. \n61  \nId.  \n62  \nProposed Tariff, Attachment A, Section 6.0. \n63  \nId. at Specifications for Long-Term Firm Point-To-Point Transmission Service, \nSection 4.0.  \n64  \nProposed Tariff, Attachment F, Attachment 1 (Specifications for Network Integration \nTransmission Service), Section 3.0. \n65  \nId. at Appendix 3."},{"page":16,"startToken":5363,"endToken":5789,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 16 \n \n \nThese revisions address the Commission’s concerns by making the Attachment \nBA, Section 2.2 operational requirements an express contractual obligation of the \nTransmission Customer or Network Customer in every pro forma transmission service \nagreement covering a HILL. SPP can therefore enforce those requirements both under \nthe Tariff and under the executed agreement. This directly resolves the Commission’s \nconcern that, without such provisions, SPP “may be unable to enforce ongoing \noperational requirements,” and preserves the real-time safeguards the Commission \nrelied on when it accepted the HILL process.66 The new delivery point identification \nfields also make it clear which delivery points carry HILL obligations, and from what \ndate. This removes any ambiguity about the scope of the customer’s obligations and \nimproves SPP’s visibility into where HILLs are on the system.  \n \nC. \nTransparency Regarding Large Load Driven Network Upgrades \nand Costs (Directive (1)(b), Transparency Component) \n \n \n1. \nCommission Concern \n \nThe Commission preliminarily found that the Tariff “appears to be unjust and \nunreasonable or unduly discriminatory or preferential because it does not contain \nprovisions requiring the provision of data on SPP’s website in a single location, and in \nan easily accessible format that is searchable and allows users to filter the data, on \ntransmission service requested by Eligible Customers on behalf of large loads, for \nNetwork Upgrades evaluated in the local transmission planning process that are needed \nto provide transmission service to Eligible Customers on behalf of those large loads, \nand the costs for those Network Upgrades.”67 The Commission acknowledged that SPP \nalready reports Network Upgrade information generally.68 Its concern was that this \nreporting is primarily aggregated and not required by the Tariff.69 The Commission \ndirected SPP to explain whether the Tariff remains just and reasonable without \nprovisions that would require SPP and the Transmission Owners to publicly post and \nregularly update data that details:  (1) the aggregate amounts of proposed large load \nadditions (including by transmission pricing zone), (2) the planned Network Upgrades \nneeded to provide transmission service to Eligible Customers on behalf of large loads, \n \n66  \nShow Cause Order at P 46; HILL Order at P 63. \n67  \nShow Cause Order at P 52; see also id. at PP 54, 56, & n.126. The Commission \nemphasized that its concern with transparency regarding Network Upgrades needed to \nprovide transmission service to Eligible Customers on behalf of large loads, as well as \nthe costs of such upgrades, is limited to Network Upgrades planned through the local \ntransmission planning process.  \n68  \nId. at P 55. \n69  \nId."},{"page":17,"startToken":5789,"endToken":6201,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 17 \n \nidentified by type of equipment and Network Upgrade (e.g. new substation, \nreconductoring, a new high-voltage transmission line) for each transmission service \nrequest, and (3) cost estimates for those Network Upgrades.70  \n \n \n2. \nProposed Revisions  \n \nSPP proposes two revisions. First, new language in Section V of Attachment O \nrequires the SPP Transmission Expansion Plan (STEP) to be “publicly available on the \nTransmission Provider’s website, in a searchable and filterable format, containing non-\nconfidential information.”71 Second, new language in Section 2.1.3.6 of Attachment \nBA requires the Host Transmission Owner to provide SPP with the Network Upgrades \nand costs identified in the Load Connection Study Report and the HILL Supplemental \nConnection Report for each HILL delivery point, for inclusion in the STEP report.72 \nThe STEP already includes Network Upgrades required under the Attachment AQ and \nAttachment AX study processes, through which HILL delivery points are studied, \ntogether with the supplemental HILL studies under Attachment BA.73  \n \nThese revisions directly respond to the Commission’s concerns. First, the \nAttachment BA revision addresses the Commission’s transparency concerns regarding \nNetwork Upgrades evaluated in the local transmission planning process by requiring \nthe Host Transmission Owner, who identifies these facilities through the HILL \nSupplemental Connection Report, to report them and their costs to SPP for inclusion in \nthe STEP. This targets exactly the category of upgrades the Commission identified: the \nCommission limited its transparency concern to Network Upgrades planned through \nthe local transmission planning process, and the Host Transmission Owner is the entity \nthat identifies those facilities.74 Second, the Attachment O revision makes the STEP, a \nsingle, Tariff-mandated repository on SPP’s website, searchable and filterable. SPP will \ndocument the Network Upgrades reported by Host Transmission Owners under \nAttachment BA in both the STEP report and the STEP's Appendix 1 spreadsheet, which \nSPP already posts on its website.75 Together, these revisions give state regulators, \ntransmission customers, and other stakeholders the means to identify which Network \nUpgrades are driven by large loads and what they cost. The revisions limit public \n \n70  \nId. at P 58. \n71  \nProposed Tariff, Attachment O, Section V.  \n72  \nProposed Tariff, Attachment BA, Section 2.1.3.6. \n73  \nTariff, Attachment O, Sections I and V. \n74  \nShow Cause Order at P 56 & n.126. \n75  \nSee, e.g., SPP, 2026 SPP Transmission Expansion Plan (STEP), posted at: \nhttps://spp.org/Documents/76727/2026%20SPP%20Transmission%20Expansion%20\n(STEP)%20Plan.zip."},{"page":18,"startToken":6201,"endToken":6556,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 18 \n \nposting to non-confidential information, consistent with the Tariff and current practice. \nThis responds to the Commission’s direction that SPP mitigate confidentiality concerns \nwhile still providing the necessary transparency.76 \nD. \nCo-Location and Behind-The-Meter Generation (Directive (1)(c), \nClarity, Interconnection, and Market Participation Components) \n \n1. \nCommission Concern  \n \nThe Commission preliminarily found that the Tariff lacks sufficient clarity and \nconsistency regarding the rates, terms, and conditions of service that apply to \ninterconnection customers serving co-located load,77 including how those customers \nmay use SPP’s generator interconnection processes, the scope of SPP’s study of co-\nlocation arrangements, and the responsibilities of the entities involved. The \nCommission also raised concerns about transmission and ancillary service rates for \nEligible Customers taking service on behalf of co-located load and load with Behind-\nThe-Meter Generation.78 This filing provides clarity and addresses the interconnection \nand market participation components of that concern. SPP addresses the transmission \nservice component, including transmission and ancillary service rates for co-located \nload, in its response in Docket No. EL26-68-000, as described in Section III.E. The \nCommission specifically invited SPP to explain how its existing HILLGA process may \nalready clarify some of these requirements or may be modified to provide such clarity. \nThe Non-Transmission Facility Revisions do both.79 \n \n2.  \nProposed Revisions  \n \n \n \na. \nDefining Non-Transmission Facilities  \n \nSPP proposes to add the following defined term to Attachment V, Section 1 and \nAttachment AY, Section II: \n \nNon-Transmission Facility shall mean a facility within \nthe SPP Region that is not included as part of the \n \n76  \nShow Cause Order at P 58.  \n77 \nThe Show Cause Order defines co-located load as a configuration that refers to end-\nuse customer load that is physically connected to the facilities of an existing or planned \ngenerating facility on the interconnection customer’s side of the point of \ninterconnection to the RTO/ISO’s transmission system. In the Show Cause Order, the \nCommission uses the term co-location arrangement when referring to both the co-\nlocated load and the associated generating facility. See id. at P 70. \n78  \nId. at PP 75–80. \n79  \nId. at P 76."},{"page":19,"startToken":6556,"endToken":6970,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 19 \n \nTransmission System or does not meet the criteria for a \ntransmission facility under Attachment AI.80 \nAttachment BB, Section 1 incorporates this definition by reference, along with \nthe definitions of “Affected System Interconnection Customer” and “Affected System \nStudy.”81 SPP also proposes to revise the definitions of “Affected System \nInterconnection Customer” and “Affected System Study” in Attachments V and AY to \nexpressly include interconnection requests for generating facilities “to a Non-\nTransmission Facility” that may cause the need for Affected System Network Upgrades \non, or that have an impact on, SPP’s Transmission System.82 Finally, SPP proposes to \nrevise the definition of “Transmission System” in Attachments V and AY to mean “the \nfacilities used by the Transmission Provider to provide transmission service under Part \nII, Part III, Part IV, and Part VII of the Tariff.”83 \n \nThese revisions supply the clear terminology the Commission sought. First, the \nnew defined term replaces the undefined and inconsistently used “non-jurisdictional” \nterminology with an objective, Tariff-based standard tied to the Transmission System \nand the transmission facility criteria in Attachment AI. Second, by bringing Non-\nTransmission Facilities within the Affected System definitions, the revisions make \nclear that generation interconnecting to those facilities, including Behind-The-Meter \nGeneration and on-site co-located generation, falls within SPP’s existing Affected \nSystem Study framework when it may affect the Transmission System. Third, the \nrevised Transmission System definition ties that term to the facilities SPP uses to \nprovide transmission service under the Tariff, so the boundary between the \nTransmission System and Non-Transmission Facilities is clear. Together, these \nrevisions give Interconnection Customers, Transmission Owners, and Market \nParticipants a consistent vocabulary across the Tariff and SPP’s Business Practices. \n \n \n \nb. \nInterconnection Study Requirements  \n \nSPP proposes to revise Attachment V, Section 9.1 and Attachment AY, Section \nV.9.1 to direct readers to Business Practice 7250 for the study requirements that apply \nwhen an Affected System Interconnection Customer seeks to interconnect to a Non-\nTransmission Facility, or to other facilities not covered by a transmission provider's \nopen access transmission tariff.84 The revised sections also point to the criteria in \nBusiness Practice 7250 that SPP uses to decide whether such a request must be studied \n \n80 \nProposed Tariff, Attachment V, Section 1; Attachment AY, Section II. \n81 \nProposed Tariff, Attachment BB, Section 1. \n82 \nProposed Tariff, Attachment V, Section 1; Attachment AY, Section II. \n83 \nId. \n84  \nProposed Tariff, Attachment V, Section 9.1; Attachment AY, Section V.9.1."},{"page":20,"startToken":6970,"endToken":7334,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 20 \n \nin the Interconnection Cluster Study under Attachment AY or in the Affected System \nStudy process detailed in Section 9 of Attachment AY.85 \n \nSPP also proposes to revise Attachment BB, Section 3.1.3(4). Under the \nrevision, a customer requesting a generator interconnection to a Non-Transmission \nFacility as part of a HILLGA Request must follow the procedures in Section 6 of \nBusiness Practice 7250.86 \n \nBusiness Practice 7250, Section 6, sets out the study framework referenced in \nthe Tariff:87 \n \nNotification. When a Transmission Owner becomes aware of an \ninterconnection request of 5 MW or greater to a Non-Transmission Facility, it must \nnotify SPP. The Transmission Owner must also notify SPP of modifications to \nexisting or planned generation on Non-Transmission Facilities, regardless of size, \nif they may materially impact the Transmission System. \nSPP evaluation. For interconnection requests of 5 MW or more that may \nimpact the Transmission System, SPP will evaluate any identified impacts to ensure \ncontinued reliability of the Transmission System. It will do so even though those \nrequests are not subject to Attachments V or AY. \nStudy pathways. Business Practice 7250 establishes five study pathways based \non the size of the request and its injection or impact on the Transmission System. \n \nPathway \nInterconnections to Non-\nTransmission Facilities \nStudy \nNaming Convention \n1 \n10 MW or greater with 1 MW \nor greater injection/impact \nDISIS/ICS \nAffected System \nGenerator \nInterconnection (ASGI) \n2 \n10 MW or greater with less \nthan 1 MW injection/impact \n90-Day Affected \nSystem Study \nNon-Transmission \nFacility Interconnection \n(NTF) \n3 \n10 MW or greater with less \nthan 1 MW injection/impact \nunder system intact conditions \nwith proposed load \n90-Day High Impact \nLarge Load Generator \nAssessment \nNon-Transmission \nFacility-High Impact \nLarge Load Generator \nAssessment (NTF-\nHILLGA) \n4 \nLess than 10 MW with 1 MW \nor greater injection/impact \n90-Day Affected \nSystem Study \nNon-Transmission \nFacility Interconnection \n(NTF) \n5 \nLess than 10 MW with less \nthan 1 MW injection/impact \nTO SIS accepted if no \ninjection/impact, or 90-\nDay Affected System \nStudy \nNon-Transmission \nFacility Interconnection \n(NTF) \n \n85  \nId.  \n86 \nProposed Tariff, Attachment BB, Section 3.1.3(4). \n87 \nBusiness Practice 7250, Section 6."},{"page":21,"startToken":7334,"endToken":7729,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 21 \n \n \nApplicability. Section 6 expressly applies to Behind-The-Meter Generation, \non-site co-located generation, and generation connected to Non-Transmission \nFacilities. \nResponsibilities. Section 6 describes the respective study, notification, and \nagreement responsibilities of the Transmission Owner and SPP. That includes the \nrequirement that Network Upgrades identified on the Transmission System be \ncompleted before the Generating Facility operates, unless SPP has approved other \nmitigations. \n \nThese revisions address the Commission’s interconnection concerns. First, the \nTariff now expressly states that interconnection requests to Non-Transmission \nFacilities are evaluated under SPP’s Affected System Study framework. It also \nidentifies where the applicable study criteria are found. Second, Business Practice 7250 \ngives objective, size- and impact-based thresholds that determine whether a request is \nstudied, which study applies, and who performs it. Generation that is behind the meter \nor co-located therefore cannot fall outside the Tariff’s study framework merely because \nthe facility it connects to is not part of the Transmission System. Third, the NTF-\nHILLGA pathway gives interconnection customers a defined route to pair Behind-The-\nMeter Generation with a HILL. This links SPP’s co-location framework to the HILL \nprocess the Commission has already found just and reasonable.88 Finally, the revisions \npreserve reliability. Generation that could inject onto, or otherwise affect, the \nTransmission System is identified and studied, and any necessary Network Upgrades \nare completed before operation. The framework also responds to the Commission’s \nconcern about the scope of the analyses SPP performs to evaluate co-location \narrangements. Business Practice 7250 requires Transmission Owner studies to include \nthermal, voltage, and short-circuit analyses. It adds stability evaluations above \nspecified size thresholds and allows SPP to perform stability analysis for NTF-\nHILLGA requests within 90 days.89 \n \n \n \nc. \nMarket Registration Responsibilities  \n \nSPP proposes to revise Attachment AE, Section 2.2(6) to provide that a failure \nor refusal to register a Resource will result in the Transmission Provider filing an \nunexecuted version of the service agreement specified in Attachment AH with the \nCommission under the name of the Market Participant or other entity that owns the \nResource or, in the case of Behind-The-Meter Generation, under the name of the \nMarket Participant representing the load where the Resource is connected.90 \n \n \n88 \nHILL Order at PP 61, 64. \n89  \nShow Cause Order at P 78; Business Practice 7250, Section 6.1. \n90 \nProposed Tariff, Attachment AE, Section 2.2(6)."},{"page":22,"startToken":7729,"endToken":8187,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 22 \n \nBusiness Practice 7250, Section 6.1 further confirms that, although generation \ninterconnecting to Non-Transmission Facilities is not subject to Attachments V or AY, \ngenerating facilities on Non-Transmission Facilities that are 10 MW or greater are \nsubject to the registration requirements in Attachment AE.91 \n \nAlthough the Tariff currently requires registration of Behind-The-Meter \nGeneration that is 10 MW or greater, the existing failure-to-register provision in \nAttachment AE, Section 2.2(6) contemplates filing an unexecuted service agreement \nunder the name of the generation interconnection customer under an interconnection \nagreement with the Transmission Provider or the applicable Transmission Owner. That \nprovision does not account for Resources that may not be subject to an interconnection \nagreement with the Transmission Provider or a Transmission Owner, such as Behind-\nThe-Meter Generation and generation interconnected to Non-Transmission Facilities. \nThese revisions address the Commission's market participation concern by extending \nthe provision to those situations and assigning responsibility to an entity with a Tariff-\nbased relationship to the Resource. During stakeholder review, SPP considered making \nthe Transmission Owner or the Transmission Customer responsible. Either may be an \nappropriate party in some circumstances, but neither would reliably capture the \nappropriate party in all of them. In many cases, the entity that owns or controls the \nNon-Transmission Facility is not a Transmission Customer under the Tariff, and the \nTransmission Owner may have no control over, or contractual relationship with, the \nowner of the Non-Transmission Facility or the Resource. Naming the Resource owner \nor, for Behind-The-Meter Generation, the Market Participant representing the host load \nplaces the registration obligation, and the consequences of failing to meet it, on the \nparty best positioned to comply. This gives the Commission clarity about when, and by \nwhom, co-located generation and Behind-The-Meter Generation must be registered in \nthe Integrated Marketplace, consistent with the Commission's emphasis on a common \nand consistent understanding of entities' responsibilities relevant to co-location \narrangements.92 \n \n \n \nd. \nAdditional Clarifying Revisions  \n \nSPP also proposes two related clarifying revisions to the Affected System Study \nprovisions. First, Attachment V, Section 9.1 and Attachment AY, Section V.9.1 now \nrefer generally to any party with which SPP has an effective joint operating agreement \nor coordination agreement, rather than only MISO or AECI. The terms of that \nagreement will govern.93 Second, Attachment V, Section 9.8 and Attachment AY, \nSection V.9.8 replace the mandatory post-study meeting requirement. Instead, within \nten Business Days after SPP posts the Affected System Study Report, Affected System \nInterconnection Customers may submit questions or request a meeting through SPP’s \n \n91 \nBusiness Practice 7250, Section 6.1. \n92  \nShow Cause Order at P 76. \n93 \nProposed Tariff, Attachment V, Section 9.1; Attachment AY, Section V.9.1."},{"page":23,"startToken":8187,"endToken":8553,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 23 \n \nRequest Management System (“RMS”).94 These revisions are consistent with the \nrevisions described above, which expand on which entities qualify as Affected System \nInterconnection Customers. They also give those customers a transparent, documented \nchannel for engaging with SPP on study results. \n \nE. \nDirectives Addressed in Separate Filings  \n \nThis filing does not address the remaining Show Cause Order directives. SPP \nis addressing them in the following separate filings:  \n \n• the Large Load Safe Harbor Revisions;   \n• the Price Adaptive Load Service (PALS); and \n• \nSPP’s response to the Show Cause Order in Docket No. EL26-68-000, \nwhich addresses, among other things, transmission and ancillary service \nrates for co-located load. \n \n \nSPP respectfully requests that the Commission consider this filing together with \nthe above filings as SPP’s response to the Show Cause Order. \n \nIV. \nPROTECTION OF EXISTING COMMERCIAL ARRANGEMENTS  \n \nThe Show Cause Order directs that any Section 205 filing explain how the \nproposal will avoid disrupting existing commercial arrangements and identify a \nreasonable effective date.95 The Large Load Revisions are designed to apply \nprospectively and with minimal disruption. Because the requested effective date is 90 \ndays after this filing, parties to agreements that are nearing completion will have a \nreasonable period to finalize them before the revisions take effect. The revisions apply \nas follows: \n \n• GETs evaluation. The new HDPS requirement will apply to HILL delivery \npoint requests submitted on or after the effective date. HDPS for requests \nsubmitted before the effective date will finish under the existing scope, so \nongoing studies are not delayed or re-performed. \n• Service agreement provisions. Transmission Customers taking service on \nbehalf of HILLs are already bound by Attachment BA, Section 2.2 under the \nTariff. The new pro forma provisions memorialize existing obligations and do \nnot create new substantive requirements. They will apply to service agreements \nexecuted or amended on or after the effective date. Existing service agreements \ncovering HILLs will be conformed at their next amendment. \n• Transparency. The searchable, filterable STEP format and the Host \nTransmission Owner reporting obligation will be implemented beginning with \n \n94 \nProposed Tariff, Attachment V, Section 9.8; Attachment AY, Section V.9.8. \n95  \nShow Cause Order at PP 5, 32, 92."},{"page":24,"startToken":8553,"endToken":8889,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 24 \n \nthe first STEP update following the effective date. Neither imposes new \nobligations on Eligible Customers or affects pending agreements. \n• Definitions. The new “Non-Transmission Facility” definition and conforming \nrevisions replace inconsistent terminology. The revised Transmission System \ndefinition is not intended to change which facilities are part of the Transmission \nSystem, and these revisions do not alter existing interconnection or \ntransmission service agreements. \n• Study requirements. The Business Practice 7250, Section 6 study pathways \nwill apply to interconnection requests to Non-Transmission Facilities for which \nthe Transmission Owner notifies SPP on or after the effective date. Studies \nalready in progress will finish under the existing scope, so ongoing studies are \nnot delayed or re-performed. \n• Market Registration. Resources are already required to register under \nAttachment AE. The revisions identify the party under whose name an \nunexecuted service agreement will be filed if a Resource fails or refuses to \nregister. They do not affect Resources that are already registered. \n• Affected System Study communications. The RMS-based question and \nmeeting process will apply to Affected System Study Reports posted on or after \nthe effective date. \nV. \nEFFECTIVE DATE  \n \n \nFor all the reasons discussed in this transmittal letter, SPP requests that the \nCommission accept the proposed revisions to the Tariff to become effective February \n16, 2027, which is not less than 60 days nor more than 120 days after the date of this \nfiling, consistent with Section 35.3(a)(1) of the Commission’s regulations.96 \n \nVI. \nADDITIONAL INFORMATION \n \nA. \nDocuments submitted with this filing: \n \nIn addition to this Transmittal Letter, SPP provides with this filing Clean \nand Redlined Tariff revisions under the Sixth Revised Volume No. 1.97 \n \nB. \nService: \n \nSPP has electronically served a copy of this filing on all its Members, \nTransmission Customers and Market Participants. A complete copy of \nthis filing will be posted on the SPP web site, www.spp.org, and is also \nbeing served on all affected state commissions. \n \n96  \n18 C.F.R. § 35.3(a)(1)."},{"page":25,"startToken":8889,"endToken":9045,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 25 \n \n \nC. \nRequisite agreements: \n \nThere are none.  \n \nD. \nCommunications \nCorrespondence and communications with respect to this filing should \nbe sent to, and SPP requests the Secretary to include on the official \nservice list, the following:98 \n \nJustin A. Hinton \nSenior Attorney \nSouthwest Power Pool, Inc. \n201 Worthen Drive \nLittle Rock, AR 72223 \nTelephone: (501) 482-2468 \njhinton@spp.org \n \nMeredith Powell \nSenior Attorney \nSouthwest Power Pool, Inc. \n201 Worthen Drive \nLittle Rock, AR 72223 \nTelephone: (501) 482-2507 \nmpowell@spp.org \n \nTessie Kentner \nDirector & Associate General Counsel \nSouthwest Power Pool, Inc. \n201 Worthen Drive \nLittle Rock, AR 72223 \nTelephone: (501) 688-1782 \ntkentner@spp.org  \n \n \n \n \n98  \nPursuant to Commission Rule 101(e), 18 C.F.R. § 385.101(e), SPP requests waiver of \nRule 203(b)(3), 18 C.F.R. § 385.203(b)(3), in order to permit more than two persons \nto be included on the service list."},{"page":26,"startToken":9045,"endToken":9144,"text":"The Honorable Debbie-Anne A. Reese \nNovember 18, 2026 \nPage 26 \n \nVII. \nCONCLUSION \n \nFor these reasons, SPP respectfully requests that the Commission accept the \nLarge Load Revisions, effective February 16, 2027. SPP further requests that the \nCommission find that this filing resolves the concerns identified in Directive (1)(a), the \ntransparency component of Directive (1)(b), and the clarity, interconnection, and \nmarket participation components of Directive (1)(c) of the Show Cause Order. \n \nRespectfully submitted, \n \n/s/ Meredith Powell  \nJustin A. Hinton \nMeredith Powell \nSouthwest Power Pool, Inc. \n201 Worthen Drive \nLittle Rock, AR  72223-4936 \n  \nAttorneys for  \nSouthwest Power Pool, Inc."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":2,"endAt":1940,"startToken":0,"endToken":681},{"p":2,"at":1940,"title":"I. SUMMARY OF FILING","method":"printed heading","endPage":5,"endAt":65,"startToken":681,"endToken":1424},{"p":5,"at":65,"title":"II. BACKGROUND","method":"printed heading","endPage":5,"endAt":82,"startToken":1424,"endToken":1426},{"p":5,"at":82,"title":"A. The HILL Process","method":"printed heading","endPage":5,"endAt":1164,"startToken":1426,"endToken":1579},{"p":5,"at":1164,"title":"B. Generator Interconnections to Facilities Outside the Transmission","method":"printed heading","endPage":6,"endAt":65,"startToken":1579,"endToken":1788},{"p":6,"at":65,"title":"C. The Show Cause Order","method":"printed heading","endPage":6,"endAt":588,"startToken":1788,"endToken":1868},{"p":6,"at":588,"title":"D. Abeyance","method":"printed heading","endPage":6,"endAt":1061,"startToken":1868,"endToken":1945},{"p":6,"at":1061,"title":"E. Stakeholder Process and Approval","method":"printed heading","endPage":10,"endAt":68,"startToken":1945,"endToken":3172},{"p":10,"at":68,"title":"III. DESCRIPTION OF AND JUSTIFICATION FOR THE LARGE LOAD","method":"printed heading","endPage":11,"endAt":1000,"startToken":3172,"endToken":3742},{"p":11,"at":1000,"title":"A. Evaluation of Alternative Transmission Technologies (Directive","method":"printed heading","endPage":15,"endAt":66,"startToken":3742,"endToken":5011},{"p":15,"at":66,"title":"B. Pro Forma Service Agreement Provisions Memorializing Ongoing","method":"printed heading","endPage":16,"endAt":963,"startToken":5011,"endToken":5502},{"p":16,"at":963,"title":"C. Transparency Regarding Large Load Driven Network Upgrades","method":"printed heading","endPage":18,"endAt":298,"startToken":5502,"endToken":6240},{"p":18,"at":298,"title":"D. Co-Location and Behind-The-Meter Generation (Directive (1)(c),","method":"printed heading","endPage":23,"endAt":366,"startToken":6240,"endToken":8238},{"p":23,"at":366,"title":"E. Directives Addressed in Separate Filings","method":"printed heading","endPage":23,"endAt":961,"startToken":8238,"endToken":8323},{"p":23,"at":961,"title":"IV. PROTECTION OF EXISTING COMMERCIAL ARRANGEMENTS","method":"printed heading","endPage":24,"endAt":1352,"startToken":8323,"endToken":8740},{"p":24,"at":1352,"title":"V. EFFECTIVE DATE","method":"printed heading","endPage":24,"endAt":1712,"startToken":8740,"endToken":8800},{"p":24,"at":1712,"title":"VI. ADDITIONAL INFORMATION","method":"printed heading","endPage":24,"endAt":1743,"startToken":8800,"endToken":8803},{"p":24,"at":1743,"title":"A. Documents submitted with this filing:","method":"printed heading","endPage":24,"endAt":1938,"startToken":8803,"endToken":8833},{"p":24,"at":1938,"title":"B. Service:","method":"printed heading","endPage":25,"endAt":68,"startToken":8833,"endToken":8899},{"p":25,"at":68,"title":"C. Requisite agreements:","method":"printed heading","endPage":25,"endAt":117,"startToken":8899,"endToken":8905},{"p":25,"at":117,"title":"D. Communications","method":"printed heading","endPage":26,"endAt":66,"startToken":8905,"endToken":9055},{"p":26,"at":66,"title":"VII. CONCLUSION","method":"printed heading","endPage":26,"endAt":705,"startToken":9055,"endToken":9144}]}