{"document":{"slug":"rec-20261118-5286","title":"PJM Interconnection L.L.C. submits Notice of Filing related to the 11/16/2026 Proposal to Address Operational Requirements for Large Computational Load and…","issued":"2026-11-18","accession":"20261118-5286","docket":"EL25-49-000","group":"PJM co-location compliance","filer":"PJM Interconnection L.L.C","kind":"notice","file":"sources/filings/text/20261118-5286_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261118-5286","tier":"record","sha256":"7b718bbd5b04efb0aa369237a3f5b269947bcb26508ea6a8e0fe044f6e198e85","pages":3,"tokens":605,"emptyPages":[],"textThemes":["colo"]},"pages":[{"page":1,"startToken":0,"endToken":301,"text":"PJM Interconnection, L.L.C. \n2750 Monroe Blvd. \nAudubon, PA 19403 \n \nMark J. Stanisz \nAssociate General Counsel \nT:  (610) 666-4707  \nmark.stanisz@pjm.com \n \n \n \n \n \n \n \n \nNovember 18, 2026 \n \nThe Honorable Debbie-Anne A. Reese \nSecretary  \nFederal Energy Regulatory Commission \n888 First Street, N.E. \nWashington, D.C. 20426-0001 \n \nRe: \nPJM Interconnection, L.L.C., et al. Docket No. EL26-67-000 \nPJM Interconnection, L.L.C., Docket Nos. EL25-49, et al. \nLarge Loads Co-Located at Generating Facilities, Docket No. AD24-11-000 \nConstellation Energy Generation, LLC v. PJM Interconnection, L.L.C., \nDocket No. EL25-20-000 \nPJM Interconnection, L.L.C., Docket No. ER26-1479-000 \nExelon Corporation, et al. Docket No. ER26-3537-000 \n \nNotice of Filing \n \nDear Secretary Reese: \n \nThis notice, being served on all parties to the above-referenced proceedings, confirms that \non November 16, 2026, PJM Interconnection, L.L.C. made the following submissions: \nTitle \nDocket \nNo. \nDescription \n \nPJM Proposal to Address \nOperational \nRequirements for Large \nComputational Load and \nEstablish \nan \nAnnual \nTransmission \nService \nReporting Requirement \n \nER27-522-\n000 \nOn November 16, 2026, in Docket No. ER27-522-000, PJM \nsubmitted proposed Tariff revisions regarding ride-through \nrequirements for Large Computational Load, other operational \nrequirements, and an annual transmission service reporting \nrequirement. PJM requested that the Tariff revisions become \neffective January 16, 2027. \n \n \nPJM Proposed Tariff \nRevisions to Establish \nthe Fast Energization \nProcess \nand \nNew \nTransmission \nServices \nPursuant to Section 205 \nof the Federal Power Act \nER27-531-\n000 \nOn November 16, 2026, in Docket No. ER27-531-000, PJM filed \nits Fast Energization Process and new Transmission Services \nproposal in response to the Commission’s large load show cause \norder and in partial compliance with the co-located load order.  \nPJM seeks a 60 day comment period, and requested a March 16, \n2027 effective date for some of its filing, and an indeterminate \neffective date for those parts of the filing relating to the new \nplanning processes."},{"page":2,"startToken":301,"endToken":530,"text":"Honorable Debbie-Anne A. Reese, Secretary \nNovember 18, 2026 \nPage 2 \n \n2 \n \nand on Compliance with \nthe Co-Located Load \nCompliance Directives \n \n \n \nMotion to Withdraw Co-\nLocated \nLoad \nCompliance \nFiling \nGiven \nOverlapping \nFiling in Docket No. \nER27-531-000 \n \nER26-\n1479-002 \nOn November 16, 2026, in Docket No. ER26-1479-002, PJM \nfiled a motion to withdraw the August 17, 2026 co-located load \ncompliance filing and terminate Docket No. ER26-1479-002 \ngiven the filing in Docket No. ER27-531.  Motion answers due \nDecember 1, 2026.  18 CFR § 385.213(d)(1).   \n \nAs explained in these submissions, the new and revised tariff records submitted in Docket \nNos. ER27-522-000 and ER27-531-000 are responsive to and consistent with the preliminary \nfindings made by the Commission in its June 18, 2026 Order Instituting Proceeding Under Section \n206 of the Federal Power Act in Docket No. EL26-67-000,1 and also comply with the \nCommission’s June 18, 2026 Order on Rehearing, Clarification, Compliance Filing and Paper \nHearing in Docket Nos. EL25-49, et al.2  \nRespectfully submitted, \n/s/ Mark J. Stanisz        \nMark Stanisz \nAssociate General Counsel \nPJM Interconnection, L.L.C. \n2750 Monroe Boulevard \nAudubon, PA 19403 \n(610) 666-2255 \nmark.stanisz@pjm.com \n \nOn behalf of \nPJM Interconnection, L.L.C.  \n \n1 PJM Interconnection, L.L.C., 195 FERC ¶ 61,211 at PP 35, 41-101 (2026), errata notice, 196 FERC ¶ 61,122 (2026). \n \n2 PJM Interconnection, L.L.C., 195 FERC ¶ 61,209 (2026)."},{"page":3,"startToken":530,"endToken":605,"text":"CERTIFICATE OF SERVICE \n \nI hereby certify that I have this day served the foregoing document upon each \nperson designated on the official service list compiled by the Secretary in these \nproceedings. \nDated at Audubon, PA, this 18th day of November, 2026. \n \n \n \n/s/ Mark J. Stanisz \n \nMark J. Stanisz \nAssociate General Counsel \nPJM Interconnection, L.L.C. \n2750 Monroe Blvd. \nAudubon, PA 19403 \n(610) 666-4707 \nMark.Stanisz@pjm.com \n \nAttorney for \nPJM Interconnection, L.L.C."}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":0,"startToken":0,"endToken":530},{"p":3,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":3,"endAt":479,"startToken":530,"endToken":605}]}