{"document":{"slug":"rec-20261119-5133","title":"Comments of Olabanji John Ogunyemi in response to the 06/18/2026 Show Cause Order","issued":"2026-11-19","accession":"20261119-5133","docket":"EL26-67-000","group":"PJM show cause proceeding (E-7)","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20261119-5133_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261119-5133","tier":"record","sha256":"1472e04642aaa1c39875872ec08a6695693373c06c0b40ddd997650bda889f5f","pages":5,"tokens":1551,"emptyPages":[],"textThemes":["study","flex","cost","colo"]},"pages":[{"page":1,"startToken":0,"endToken":282,"text":"UNITED STATES OF AMERICA\nBEFORE THE\nFEDERAL ENERGY REGULATORY COMMISSION\n)\nPJM Interconnection, L.L.C., et al.\n)\nDocket No. EL26-67-000\n)\nCOMMENTS OF OLABANJI JOHN OGUNYEMI\nOlabanji John Ogunyemi submits these comments in the above-captioned proceeding. On \nJune 18, 2026, the Commission directed PJM Interconnection, L.L.C. (PJM) and the PJM \nTransmission Owners to show cause why PJM's Open Access Transmission Tariff remains just and \nreasonable without provisions addressing (a) the application process, study procedures and \noperational requirements for transmission service on behalf of large loads; (b) transparency of \nNetwork Upgrade costs and a pro forma cost recovery agreement; (c) transmission services for \nflexible large loads; and (d) the rates, terms and conditions of service applicable to interconnection \ncustomers serving electrically proximate large load or co-located load.  PJM Interconnection, \nL.L.C., 195 FERC ¶ 61,211, at P 3 (2026) (Show Cause Order). The Commission also directed PJM \nto report on how it intends to ensure that adequate generation will be available to serve existing and \nnew large loads. Id. P 4.\nThese comments address one question that runs through each of those issues: whether the \ngeneration built to serve large loads can be financed. My comments are offered from the \nperspective of the lenders, tax equity investors and tax credit buyers whose capital that generation \ndepends on.\nI.\nINTEREST OF THE COMMENTER\nI am a project finance professional working on solar and battery storage projects in the \nUnited States. My work includes sizing construction and term debt for solar projects, preparing the \ndocumentation lenders and tax credit buyers require before they commit capital, and managing \noperating solar assets and the reporting their lenders rely on. My experience is with distribution-\n1"},{"page":2,"startToken":282,"endToken":637,"text":"connected projects in the Midwest and New England, outside the PJM region, but the financing \ntests these projects must pass are the same nationwide. I submit these comments in my personal \ncapacity. They do not represent the views of any employer, client or counterparty, and I am not a \nparty to this proceeding.\nII.\nSUMMARY\nMuch of the new generation that will serve large loads, including data centers, will be solar \nand battery storage, because those resources can be built fastest. The U.S. Energy Information \nAdministration reports that developers planned to add 43.4 GW of utility-scale solar and 24 GW of \nbattery storage in 2026, out of 86 GW of planned additions.[1] Whether that generation is built \ndepends in large part on whether it can be financed. Capital providers commit only against terms \nthey can underwrite: a known path to interconnection and service, a cost exposure they can \nquantify, and a schedule that fits the project's other deadlines. I support reforms that give large \nloads, and the generation serving them, those three things, and I urge the Commission to direct PJM \nto set them out in its Tariff.\nIII.\nCOMMENTS\nA.\nStudy procedures should have defined timelines, because federal law now fixes a \ncompletion deadline for solar (Show Cause Order P 3(a)).\nPublic Law 119-21 ends the clean electricity investment and production credits for wind \nand solar facilities placed in service after December 31, 2027, where construction begins after July \n4, 2026.[2] For a solar project financed against the credit, a delay in interconnection or service \nstudies is no longer only a delay. It can cost the project its credit, and with it a large part of the \ncapital that makes the project financeable. Lawrence Berkeley National Laboratory reports that the \nmedian project built in 2025 took 61 months from interconnection request to commercial \noperation, and that only about 13 percent of the capacity that requested interconnection from 2000 \nto 2020 had reached commercial operation by the end of 2025.[3] The Commission has already \naccepted, in Southwest Power Pool's tariff, a process it found \"reasonably provides a flexible, \n2"},{"page":3,"startToken":637,"endToken":977,"text":"expedited,  and  separate  serial  interconnection  process  that  will  facilitate  the  prompt \ninterconnection of generating facilities that are limited to serving\" a high impact large load.[4] I \nencourage the Commission to require that the procedures PJM adopts for large loads, and for the \ngeneration serving them, include defined study timelines of that kind, so that projects can plan \nagainst the statutory deadline with confidence.\nB.\nCost transparency should extend to estimates that capital providers can rely on \n(Show Cause Order P 3(b)).\nI support the Commission's focus on transparency of Network Upgrade costs and on a pro \nforma cost recovery agreement to mitigate cost shifting. I would add that, for financing purposes, \nthe value of transparency depends on whether cost estimates are firm enough to be relied on. Debt \nis sized against a project's expected costs and cash flows; an upgrade estimate that can change \nmaterially after financial close is a risk lenders price conservatively or refuse to take. Research on \ninterconnection costs has found that projects that withdrew from the queue faced substantially \nhigher estimated interconnection costs than those that completed the study process.[5] A pro forma \nagreement with estimates that are binding, or bounded within a stated range, would let capital \nproviders size their commitments with confidence while still protecting other customers from cost \nshifts.\nC.\nClear services for flexible large loads would support storage financed alongside \nthem (Show Cause Order P 3(c)).\nBattery storage is particularly relevant to transmission services for flexible large loads. \nUnder Public Law 119-21, the termination that applies to wind and solar does not apply to energy \nstorage technology,[6] so storage will remain financeable against the federal credit after 2027. \nStorage paired with a large load can let that load limit its use of the transmission system under the \nconditions the Commission describes. Clear rules defining how such a flexible load is served, and \nhow its storage is treated, would let that storage be financed on firmer ground and built where it can \ndo the most for reliability.\n3"},{"page":4,"startToken":977,"endToken":1316,"text":"D.\nTerms for generation serving electrically proximate or co-located load should be set \nout in the Tariff (Show Cause Order P 3(d)).\nFrom a financing perspective, the most important feature of the rates, terms and conditions \nfor interconnection customers serving electrically proximate or co-located load is that they are \ndefined in advance. A construction lender sizes its loan, sets its draw conditions and fixes its \nconversion tests against the project's expected interconnection and service arrangements. Where \nthose arrangements depend on negotiations whose outcome cannot be known at financial close, the \nlender either discounts the project's value, requires additional equity or reserves, or declines to \nlend. Defined Tariff terms would allow generation serving these loads to be underwritten on the \nsame basis as other generation, and would reduce the number of projects that stall before financial \nclose.\nE.\nPJM's assessment of adequate generation should reflect delivered output (Show \nCause Order P 4).\nIn reporting how it will ensure adequate generation to serve large loads, PJM should \naccount for the output that generation actually delivers, not only its nameplate capacity. Operating \nsolar plants do not always deliver their expected output. A National Renewable Energy Laboratory \nstudy of 8.5 GW of U.S. photovoltaic systems found median availability of 0.99 but tenth-\npercentile availability of 0.95, meaning a tenth of systems lost at least five percent of production to \nunavailability alone.[7] Accounting for delivered output would give a more accurate picture of the \ngeneration available to large loads, and would reward owners who keep their plants performing.\nIV.\nCONCLUSION\nNew solar and storage generation can help meet the demand of large loads quickly, but only \nif it can be financed. I respectfully urge the Commission to direct PJM to adopt Tariff provisions \nthat give large loads and the generation serving them (i) study procedures with defined timelines, \n(ii) cost estimates that capital providers can rely on, (iii) clear services for flexible large loads \npaired with storage, and (iv) defined rates, terms and conditions for interconnection customers \n4"},{"page":5,"startToken":1316,"endToken":1551,"text":"serving electrically proximate or co-located load, and to account for delivered output in assessing \nwhether adequate generation is available.\nRespectfully submitted,\n/s/ Olabanji John Ogunyemi\nOlabanji John Ogunyemi\nSaint Paul, Minnesota\nbanjiogunyemi@gmail.com\nFiled in his personal capacity\nDated: November 19, 2026\nNotes\n[1] U.S. Energy Information Administration, Today in Energy, \"New U.S. electric generating \ncapacity expected to reach a record high in 2026\" (Feb. 20, 2026).\n[2] Pub. L. No. 119-21 (2025), amending 26 U.S.C. §§ 45Y and 48E for wind and solar \nfacilities.\n[3] Lawrence Berkeley National Laboratory, Queued Up: 2026 Edition, Characteristics of \nPower Plants Seeking Transmission Interconnection (2026).\n[4] Show Cause Order (discussing Southwest Power Pool, Inc., 194 FERC ¶ 61,031, at P 64 \n(2026)).\n[5] Lawrence Berkeley National Laboratory, Generator Interconnection Costs to the \nTransmission System in non-ISO Balancing Authorities (finding average estimated costs of \n$671/kW for withdrawn projects against $194/kW for projects that completed all studies). \nThe study covers balancing authorities outside the organized markets and is cited for the \ngeneral relationship between cost and withdrawal.\n[6] Pub. L. No. 119-21 (2025). The wind and solar termination does not apply to energy storage \ntechnology, which remains subject to the general phase-down of the section 48E credit.\n[7] National Renewable Energy Laboratory, Availability and Performance Loss Factors for U.S. \nPV Fleet Systems, NREL/TP-5K00-88769 (2024) (8.5 GW across 1,128 systems).\n5"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":1437,"startToken":0,"endToken":218},{"p":1,"at":1437,"title":"I. INTEREST OF THE COMMENTER","method":"printed heading","endPage":2,"endAt":315,"startToken":218,"endToken":335},{"p":2,"at":315,"title":"II. SUMMARY","method":"printed heading","endPage":2,"endAt":1137,"startToken":335,"endToken":473},{"p":2,"at":1137,"title":"III. COMMENTS","method":"printed heading","endPage":2,"endAt":1151,"startToken":473,"endToken":475},{"p":2,"at":1151,"title":"A. Study procedures should have defined timelines, because federal law now fixes a","method":"printed heading","endPage":3,"endAt":443,"startToken":475,"endToken":701},{"p":3,"at":443,"title":"B. Cost transparency should extend to estimates that capital providers can rely on","method":"printed heading","endPage":3,"endAt":1441,"startToken":701,"endToken":856},{"p":3,"at":1441,"title":"C. Clear services for flexible large loads would support storage financed alongside","method":"printed heading","endPage":4,"endAt":0,"startToken":856,"endToken":977},{"p":4,"at":0,"title":"D. Terms for generation serving electrically proximate or co-located load should be set","method":"printed heading","endPage":4,"endAt":923,"startToken":977,"endToken":1114},{"p":4,"at":923,"title":"E. PJM's assessment of adequate generation should reflect delivered output (Show","method":"printed heading","endPage":4,"endAt":1699,"startToken":1114,"endToken":1236},{"p":4,"at":1699,"title":"IV. CONCLUSION","method":"printed heading","endPage":5,"endAt":1582,"startToken":1236,"endToken":1551}]}