{"document":{"slug":"rec-20261119-5227-2","title":"Exhibit No. SPP-0001- Affidavit of Natasha Henderson","issued":"2026-11-19","accession":"20261119-5227","docket":"ER27-577-000","group":"SPP large-load tariff revisions","filer":"Southwest Power Pool, Inc.","kind":"attachment","file":"sources/filings/text/20261119-5227_004.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261119-5227","tier":"record","parent":"rec-20261119-5227","sha256":"94447c5280fb16605921fa3a6a6b8305f7ac5dc38085327959ac9438dedbc2f3","pages":4,"tokens":485,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":3,"text":"Exhibit No. SPP-0001"},{"page":2,"startToken":3,"endToken":256,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nSouthwest Power Pool, Inc. \n)         Docket No. ER27-________ \nAFFIDAVIT OF NATASHA HENDERSON \nON BEHALF OF  \nSOUTHWEST POWER POOL, INC. \n1.\nMy name is Natasha Henderson.  I am employed by Southwest Power Pool,\nInc. (“SPP”) as Senior Director, Grid Asset Utilization.  My business address is 201 \nWorthen Drive, Little Rock, AR 72223.  In my current position, my primary duties are to \noversee the policy development for the engineering department, including transmission \nplanning, load connection, resource adequacy and generation interconnection, as well as \nthe performance of technical studies and assessments necessary to respond to requests for \nspecial generator interconnection service and long-term transmission service, and \ninnovative research. I establish strategic direction for SPP’s Open Access Transmission \nTariff (“Tariff”) services and resource utilization initiatives, and direct SPP’s Tariff \nservices and resource utilization activities across all applicable areas of the organization in \naccordance with SPP’s Tariff and established strategy. \n2. I received a Bachelor of Business Administration, Economics and Master of Arts\nin Economics, Financial Track, from Wichita State University in 2004 and 2006, \nrespectively.  Before being named to my present position as Senior Director of Strategic \nPolicy and Load Integration in June of 2026, I held the Senior Director of Grid Asset \nUtilization role, and prior to that I held the Director, System Planning role at SPP.  Prior to \nmy time at SPP, which began in 2023, I was Director of Compliance, Regulatory and \nMarket Affairs at Golden Spread Electric Cooperative, Inc. (“Golden Spread”), where I led"},{"page":3,"startToken":256,"endToken":413,"text":"Golden Spread’s compliance and market advocacy in the regions of SPP and the Electric \nReliability Council of Texas, before the Public Utility Commission of Texas, and before \nthe Federal Energy Regulatory Commission (“Commission”). \n3.\nI am submitting this affidavit to support the accuracy of the information\nincluded in Attachment A to this affidavit. Attachment A is a spreadsheet outlining the \nupgrade costs resulting from Notifications to Construct (“NTCs”) that have been issued by \nSPP through its delivery point study processes from 2012 until 2025, which includes for \neach load request (1) the load amount; (2) total cost of the Network Upgrades identified; \n(3) cost per MW of load requested; (4) the average (if multiple upgrades) date when the\nNetwork Upgrades were put into service; and (5) the cost per MW percentile compared to \nthe other requests included on Exhibit 1. \n4.\nTo the best of my knowledge, the information included in Attachment A is\ntrue and correct."},{"page":4,"startToken":413,"endToken":485,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nSouthwest Power Pool, Inc. \n) \nDocket No. ER27-____-000 \nExecuted this _______ day of _________, ______. \n/s/ Natasha Henderson\nNatasha Henderson\nLead Engineer, Grid Asset Utilization\nSouthwest Power Pool, Inc. \nVERIFICATION \nPursuant to 28 U.S.C. § 1746, I, Natasha Henderson, state under penalty of perjury that \nthe foregoing testimony is true and correct to the best of my information, knowledge and \nbelief.\n17th\nNovember 2026"}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 4","method":"page range","endPage":4,"endAt":507,"startToken":0,"endToken":485}]}