{"document":{"slug":"rec-20261119-5227-3","title":"Exhibit No. SPP-0002- Affidavit of Don Frerking","issued":"2026-11-19","accession":"20261119-5227","docket":"ER27-577-000","group":"SPP large-load tariff revisions","filer":"Southwest Power Pool, Inc.","kind":"attachment","file":"sources/filings/text/20261119-5227_005.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261119-5227","tier":"record","parent":"rec-20261119-5227","sha256":"d795f04d6b99c0aaf5406d83c54d3e225da3b72fafff2918a35d67df71f84dd7","pages":4,"tokens":568,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":3,"text":"Exhibit No. SPP-0002"},{"page":2,"startToken":3,"endToken":257,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nSouthwest Power Pool, Inc. \n)         Docket No. ER27-________ \nAFFIDAVIT OF DON A. FRERKING \nON BEHALF OF  \nSOUTHWEST POWER POOL, INC. \n1.\nMy name is Don A. Frerking.  I am employed by Southwest Power Pool,\nInc. (“SPP”) as Lead Engineer, Regulatory Policy.  My business address is 201 Worthen \nDrive, Little Rock, AR 72223. In my current position I provide regulatory support, \nparticularly regarding transmission policy and rates, for SPP’s internal leadership and \nexternal stakeholders.  In this role, I conduct research, perform rate analyses, and monitor \npolicies and procedures related to the administration and modification of SPP’s governing \ndocuments.  \n2.\nI earned a Bachelor of Science Degree in Industrial Engineering and a\nMaster of Business Administration with an emphasis in Finance, both from the University \nof Missouri-Columbia.  I am a registered Professional Engineer in the State of Missouri.  \nPrior to beginning my employment with SPP in 2019, I was employed by Evergy, Inc. and \none of its predecessor companies, Kansas City Power & Light Company, for more than \nthirty years in various analytical or managerial roles in the areas of valuation engineering, \nbusiness development, finance and structuring, business planning, and regulatory affairs.\n3.\nI am submitting this affidavit to support the accuracy of the information\nincluded in Attachment A to this affidavit. The gross and net transmission plant per \nmegawatt (“MW”) estimated values for the SPP Region that are included in Attachment A \nwere used as support for the Load Safe Harbor Limit proposed in the above referenced"},{"page":3,"startToken":257,"endToken":497,"text":"docket. The difference between the gross and net plant values shown in Attachment A is \nthe amount of accumulated depreciation expense associated with the transmission assets. \nThe transmission plant per MW values were derived from: (1) gross and net plant values \nand annual transmission revenue requirement (“ATRR”) values in individual Transmission \nOwner formula rate template updates (effective as of the August 2026); and (2) ATRR and \nzonal coincident peak (“CP”) load information sourced from the August 2026 Revenue \nRequirements and Rates (“RRR”) file.1 The loads represent the sum, across all Zones in \nthe SPP Region in the first column and across all Zones in the SPP East Region in the \nsecond column, of the highest monthly value for each Zone during calendar year 2025. \nValues for gross and net plant were sourced primarily from the Transmission Owners’ \nformula rates. However, approximately 4% of the value was derived through estimation, \nbased on the ratios between the gross and net plant amounts and the ATRR amounts of \nthose Transmission Owners for which formula rate information was used, multiplied by \nthe ATRR amounts of those Transmission Owners for which formula rate information was \nnot used.     \n4.\nTo the best of my knowledge, the information included in Attachment A is\ntrue and correct. \n1\nThe \nRRR \nfile \nfor \nAugust \n2026 \ncan \nbe \nfound \nthat \nthe \nfollowing: \nhttps://www.spp.org/Documents/77514/RRR%20For%20Bills%20October%202025%20Revenue\n%20Requirements%20and%20Rates-Rev%2020260818.xlsx"},{"page":4,"startToken":497,"endToken":568,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nSouthwest Power Pool, Inc. \n) \nDocket No. ER27-____-000 \nVERIFICATION \nPursuant to 28 U.S.C. § 1746, I, ____________, state under penalty of perjury that the \nforegoing testimony is true and correct to the best of my information, knowledge and belief.   \nExecuted this _______ day of _________, ______. \n/s/ Don Frerking \nDon Frerking\nLead Engineer, Regulatory Policy \nSouthwest Power Pool, Inc. \nDon Frerking\n17th\nNovember 2026"}],"sections":[{"p":1,"at":0,"title":"Pages 1 to 4","method":"page range","endPage":4,"endAt":504,"startToken":0,"endToken":568}]}
