{"document":{"slug":"rec-20261119-5279","title":"Expedited Motion for a Nine-Day Extension of Comment Deadline of Constellation Energy Generation, LLC","issued":"2026-11-19","accession":"20261119-5279","docket":"ER27-508-000","group":"CAISO and California transmission owners’ large-load tariff revisions","filer":"Constellation Energy Generation, LLC","kind":"comments","file":"sources/filings/text/20261119-5279_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261119-5279","tier":"record","sha256":"e1d5c02ce1ce9c0e4ad14b7ce365ec31d2e3804fb0833327a5927fbe5d0ed93c","pages":3,"tokens":560,"emptyPages":[],"textThemes":[]},"pages":[{"page":1,"startToken":0,"endToken":240,"text":"UNITED STATES OF AMERICA \nBEFORE THE \nFEDERAL ENERGY REGULATORY COMMISSION \nPacific Gas and Electric Company \n \n \n) \n \nDocket No. ER27-513-000 \n \nSouthern California Edison Company \n \n) \n \nDocket No. ER27-508-000 \n \nSan Diego Gas & Electric Company  \n \n) \n \nDocket No. ER27-521-000 \n \n \n \n \n \n \n \n \n      \n \n(not consolidated) \n \nEXPEDITED MOTION FOR A NINE-DAY EXTENSION OF TIME OF  \nCONSTELLATION ENERGY GENERATION, LLC \n \nConstellation Energy Generation, LLC (“Constellation”) respectfully requests a short \nnine-day extension of the December 7, 2026 comment deadline in the above-captioned dockets. \nOn November 16, 2026, Pacific Gas and Electric Company (“PG&E”), Southern \nCalifornia Edison Company (“SCE”), and San Diego Gas & Electric Company (“SDG&E”) \nsubmitted filings under section 205 of the Federal Power Act in the above-captioned dockets in \nresponse to the Commission’s June 18, 2026 order instituting a section 206 proceeding (“Show \nCause Proceeding”) requiring a response from the California Independent System Operator Corp. \n(“CAISO”) and numerous transmission-owning utilities in the CAISO region.1  CAISO also \nmade a section 205 filing on November 16, 2026 in response to the same Commission order in \nDocket No. ER27-508-000.  The Show Cause Proceeding addresses RTO/ISO and transmission \nutility tariff provisions relating to large load integration.   \nThe PG&E, SCE, and SDG&E filings currently have been assigned a comment date of \nDecember 7, 2026, while the CAISO filing has a comment date of December 15, 2026.  All of \nthese filings involve important issues that are highly interrelated.  As such, Constellation \n \n1 California Independent System Operator Corp., 195 FERC ¶ 61,214 (2026)."},{"page":2,"startToken":240,"endToken":496,"text":"2 \n \nrespectfully requests a short nine-day extension of time to respond to the PG&E, SCE, and \nSDG&E filings.  Constellation submits that a nine-day extension to align response deadlines will \nfacilitate more efficient and effective briefing of the issues presented in these interrelated \ndockets.  Additionally, a short extension would also be beneficial given the impacts of the \nThanksgiving holiday falling during the comment period.   \nGiven the timing of the upcoming holiday and short nature of this extension request, \nConstellation requests that the Commission grant this Motion summarily and issue a notice \nextending the deadline by November 23, 2026.  Granting the requested relief to extend the \ncomment deadline to December 16, 2026, will not affect or interfere with the proposed effective \ndates for tariff changes requested in the CAISO filing, nor in the PG&E, SCE, and SDG&E \nfilings. \nRespectfully submitted, \n    /s/ Yena Lee \nTodd L. Brecher  \nVice President and Managing Counsel  \nConstellation Energy Generation, LLC  \n250 Massachusetts Avenue NW Ste. 700  \nWashington, D.C. 20001  \n202-969-1324  \ntodd.brecher@constellation.com \n \nChristopher A. Wilson \nVice President, Federal Regulatory Affairs \nConstellation Energy Generation, LLC \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001 \n202-347-7500 \nFERCe-filings1@constellation.com \n \nYena Lee \nAssistant General Counsel \nConstellation Energy Generation, LLC \n250 Massachusetts Ave. NW, Suite 760 \nWashington, D.C. 20001 \n202-320-3335  \nyena.lee@constellation.com \n \nSeth T. Lucia  \nAssistant General Counsel \nConstellation Energy Generation, LLC \n250 Massachusetts Avenue NW, Suite 760 \nWashington, D.C. 20001 \n703-399-9803 \nseth.lucia@constellation.com \n \n \nCounsel for Constellation Energy Generation, LLC \nNovember 19, 2026"},{"page":3,"startToken":496,"endToken":560,"text":"CERTIFICATE OF SERVICE \n \nI hereby certify that I have on this 19th day of November 2026, caused to be served a copy \nof the foregoing upon all parties on the service lists in these proceedings in accordance with the \nrequirements of Rule 2010 of the Commission’s Rules of Practice and Procedure, 18 C.F.R. \n§ 385.2010. \n/s/ Sara Gordon \nConstellation Energy Generation, LLC"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":3,"endAt":0,"startToken":0,"endToken":496},{"p":3,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":3,"endAt":374,"startToken":496,"endToken":560}]}