{"document":{"slug":"rec-20261120-5248","title":"Comments of Olabanji John Ogunyemi on the Midcontinent Independent System Operator, Inc.’s 11/16/2026 Large Load filing and the 06/18/2026 Show Cause Order","issued":"2026-11-20","accession":"20261120-5248","docket":"EL26-70-000","group":"MISO show cause proceeding (E-8)","filer":"Individual No Affiliation","kind":"comments","file":"sources/filings/text/20261120-5248_001.txt","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_number=20261120-5248","tier":"record","sha256":"61133000c8d5f286067cd44fe0d705f8cd718a8aab226c744432fbed6224e978","pages":5,"tokens":1435,"emptyPages":[],"textThemes":["study","cost"]},"pages":[{"page":1,"startToken":0,"endToken":267,"text":"UNITED STATES OF AMERICA\nBEFORE THE\nFEDERAL ENERGY REGULATORY COMMISSION\n)\nMidcontinent Independent System\n)\nDocket Nos. ER27-526-000\n  Operator, Inc.\n)\n                    EL26-70-000\n)\nCOMMENTS OF OLABANJI JOHN OGUNYEMI\nOlabanji John Ogunyemi submits these comments on the November 16, 2026 filing by \nMidcontinent Independent System Operator, Inc. (MISO) in Docket No. ER27-526-000, titled \n\"Large Load Review, Cost Recovery and Transmission Services Filing\" (Filing). The Filing \nproposes Tariff provisions responding to the Commission's June 18, 2026 order finding that \nMISO's Tariff appears to lack provisions on large loads, co-located loads and generation serving \nelectrically proximate large load. Midcontinent Indep. Sys. Operator, Inc., 195 FERC ¶ 61,212 \n(2026) (Show Cause Order); see Midcontinent Indep. Sys. Operator, Inc., 196 FERC ¶ 61,217, at \nPP 5, 9 (2026). Because the Filing responds to the Show Cause Order, these comments are \nsubmitted in both dockets.\nMy comments address one practical question: whether the proposed provisions will leave \nsolar and storage generation in the MISO footprint, both new projects and those already operating, \nwith terms that lenders and investors can underwrite. In several respects the Filing moves in that \ndirection, and I offer suggestions on where clarity would help.\nI.\nINTEREST OF THE COMMENTER\nI am a project finance professional based in Saint Paul, Minnesota. I work on the financing \nand asset management of solar projects in Minnesota, within the MISO footprint, and in New \nEngland. My work includes sizing construction and term debt, preparing the documentation \nlenders and tax credit buyers require before they commit capital, and preparing the reporting \nlenders rely on once projects are operating. I submit these comments in my personal capacity. They \n1"},{"page":2,"startToken":267,"endToken":596,"text":"do not represent the views of any employer, client or counterparty, and I am not a party to either \nproceeding.\nII.\nSUMMARY\nLarge loads in the MISO footprint will be served in part by new solar and battery storage, \nwhich can be built faster than other resources. Developers planned to add 43.4 GW of utility-scale \nsolar and 24 GW of battery storage nationally in 2026, out of 86 GW of planned additions.[1] That \ngeneration is built only if it can be financed. The Filing's defined review periods and its expedited \nstudy for loads paired with nearby generation are steps toward financeable terms. I respectfully ask \nthe Commission to (i) recognize the value of those defined timelines, (ii) ensure the paired-\ngeneration study is open to, and workable for, financed solar and storage, (iii) confirm that a paired \ngenerator's interconnection service does not depend on the load remaining in place, and (iv) protect \nthe interconnection service of existing generators.\nIII.\nCOMMENTS\nA.\nThe Filing's defined review periods are valuable, because federal law now fixes a \ncompletion deadline for solar.\nThe Filing establishes the Large Load Project Review as the core study process, run in three \nstudy cycles each year with application deadlines posted at least 90 days in advance, and with \nstated periods for each step, including a fifteen-Business-Day review of applications and a defined \ncure period.[2] It also integrates the Large Load Addition Resource Study (LARS), proposed \nseparately in Docket No. ER27-25-000, under which very large loads and the generation paired \nwith them are studied on a coordinated timeline.[3] Defined periods of this kind matter to capital \nproviders. Under Public Law 119-21, the clean electricity investment and production credits are \nnot available for wind and solar facilities placed in service after December 31, 2027, where \nconstruction begins after July 4, 2026.[4] A solar project financed against the credit cannot absorb \nan open-ended study. The Commission has recognized the value of a comparable expedited \n2"},{"page":3,"startToken":596,"endToken":953,"text":"process in Southwest Power Pool's tariff.[5] I support the defined periods in the Filing and \nencourage the Commission to preserve them.\nB.\nThe paired-generation study should be workable for financed solar and storage.\nAs described in the Filing, LARS is available to large loads of 200 MW or more that are \nformally paired with the generation that will serve them, with a commercial agreement of at least \nfive years and a pairing of at least fifteen years.[3] Generation serving load at the same substation \nmay instead use MISO's proposed zero injection interconnection agreement, filed in Docket No. \nER26-3552-000, while MISO has said that generation serving electrically proximate load would be \naddressed through further work.[6] Three points would help financing:\n•\nLoads between 50 MW and 200 MW. MISO lowered the LARS threshold from 250 MW \nto 200 MW in response to stakeholder feedback.[7] Even so, a load of 50 MW to 200 MW \nthat is served by nearby generation not at the same substation appears to have no \ncoordinated path for studying the load and its generation together. I encourage the \nCommission to ask MISO whether a lower threshold, or a scaled coordinated process for \nsmaller pairs, is feasible, since solar and storage projects sized to serve loads in that range \nwould otherwise lack a coordinated path.\n•\nThe generator's interconnection rights over the pairing period. Term debt for a solar or \nstorage project typically runs longer than five years, and lenders treat the project's \ninterconnection service as part of their collateral. The Tariff should state clearly what \nhappens to a paired generator's interconnection service if the load is delayed, curtailed, \ndefaults or exits before the fifteen-year period ends, so that the generator's lenders can \nassess that risk at financial close.\n•\nStorage as paired generation. I support the exclusion of load used exclusively for \ncharging an Electric Storage Resource from the definition of Large Load,[8] and I note that \nthe zero injection proposal allows an Electric Storage Resource to participate.[9] I \nencourage the Commission to confirm that battery storage, alone or with solar, may also \nserve as the paired resource in LARS.\n3"},{"page":4,"startToken":953,"endToken":1254,"text":"C.\nCost certainty for the large load supports the financing of the generation that serves \nit.\nThe Filing proposes pro forma cost recovery agreements under which the large load \ncustomer provides security and makes revenue commitments for Large Load Network Upgrades, \ntogether with a Large Load Transparency Dashboard reporting the location and estimated costs of \nlarge loads.[10] I support this structure, which protects other customers from cost shifts. It also \nmatters to generators: where a generator sells output to a large load, the generator's lenders look \nclosely at the load customer's obligations. Cost estimates and true-up mechanisms that are \npredictable, and bounded where possible, make the load a more creditworthy counterparty and the \ngeneration serving it easier to finance.\nD.\nThe interconnection service of existing generators should be protected.\nThis point is drawn from the operating side of my work. An operating solar project's debt is \nsecured on the project's revenue, and that revenue depends on the interconnection service the \nproject holds. I urge the Commission to confirm that the provisions the Filing adds, including \ndeferral of service, interim service and the curtailment terms applicable to large loads, do not \nreduce the interconnection service of, or shift new upgrade costs onto, existing generators that are \nnot party to a large load arrangement. Uncertainty on this point would affect the financing of \ngeneration that is already serving the grid.\nIV.\nCONCLUSION\nI respectfully ask the Commission, in acting on the Filing and in the show cause \nproceeding, to preserve the Filing's defined review periods; to ensure the paired-generation study is \nopen to, and workable for, financed solar and storage, including clear treatment of the generator's \ninterconnection service over the pairing period; to support predictable cost terms for large loads; \nand to protect the interconnection service of existing generators.\nRespectfully submitted,\n4"},{"page":5,"startToken":1254,"endToken":1435,"text":"/s/ Olabanji John Ogunyemi\nOlabanji John Ogunyemi\nSaint Paul, Minnesota\nbanjiogunyemi@gmail.com\nFiled in his personal capacity\nDated: November 20, 2026\nNotes\n[1] U.S. Energy Information Administration, Today in Energy, \"New U.S. electric generating \ncapacity expected to reach a record high in 2026\" (Feb. 20, 2026).\n[2] Filing, Transmittal Letter, pages 14-15 and proposed Attachment FF, Section I.D.1.c (Large \nLoad Project Review).\n[3] Filing, Transmittal Letter, pages 9-10, 13 (note 43) and 15; proposed Tariff provisions on \nLarge Load Application study options.\n[4] Pub. L. No. 119-21 (2025), amending 26 U.S.C. §§ 45Y and 48E for wind and solar \nfacilities.\n[5] See PJM Interconnection, L.L.C., 195 FERC ¶ 61,211 (2026) (discussing Southwest Power \nPool, Inc., 194 FERC ¶ 61,031, at P 64 (2026)).\n[6] Filing, Transmittal Letter, page 9 (describing the zero injection generator interconnection \nagreement proposal in Docket No. ER26-3552-000).\n[7] Filing, Transmittal Letter, page 10.\n[8] Filing, proposed definition of Large Load.\n[9] Filing, Transmittal Letter, page 45.\n[10]\nFiling, Transmittal Letter, page 5; proposed Attachments LLL and MMM.\n5"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":1332,"startToken":0,"endToken":188},{"p":1,"at":1332,"title":"I. INTEREST OF THE COMMENTER","method":"printed heading","endPage":2,"endAt":112,"startToken":188,"endToken":287},{"p":2,"at":112,"title":"II. SUMMARY","method":"printed heading","endPage":2,"endAt":972,"startToken":287,"endToken":427},{"p":2,"at":972,"title":"III. COMMENTS","method":"printed heading","endPage":2,"endAt":986,"startToken":427,"endToken":429},{"p":2,"at":986,"title":"A. The Filing's defined review periods are valuable, because federal law now fixes a","method":"printed heading","endPage":3,"endAt":137,"startToken":429,"endToken":618},{"p":3,"at":137,"title":"B. The paired-generation study should be workable for financed solar and storage.","method":"printed heading","endPage":4,"endAt":0,"startToken":618,"endToken":953},{"p":4,"at":0,"title":"C. Cost certainty for the large load supports the financing of the generation that serves","method":"printed heading","endPage":4,"endAt":798,"startToken":953,"endToken":1073},{"p":4,"at":798,"title":"D. The interconnection service of existing generators should be protected.","method":"printed heading","endPage":4,"endAt":1499,"startToken":1073,"endToken":1182},{"p":4,"at":1499,"title":"IV. CONCLUSION","method":"printed heading","endPage":5,"endAt":1156,"startToken":1182,"endToken":1435}]}