{"document":{"slug":"report-el26-67-pjm","title":"PJM reports on resource adequacy and large-load proposals","issued":"2026-07-20","accession":"20260720-5203","docket":"EL26-67-000","group":"PJM filings","filer":"PJM Interconnection, L.L.C.","kind":"informational report","file":"sources/originals/20260720-5203_01.pdf","url":"https://elibrary.ferc.gov/eLibrary/filelist?accession_Number=20260720-5203","sha256":"44f49025b30ce76a0c5c722d9f15ce8d42664f1eb44c381b6f546e3e0713506d","pages":12,"tokens":3633,"emptyPages":[]},"pages":[{"page":1,"startToken":0,"endToken":282,"text":"PJM Interconnection, L.L.C. \n2750 Monroe Blvd \nAudubon, PA 19403 \nDaniel Vinnik \nCounsel \nT: (267) 858-9451 \nDaniel.Vinnik@pjm.com\nJuly 20, 2026 \nHonorable Debbie-Anne A. Reese  \nSecretary  \nFederal Energy Regulatory Commission \n888 First Street, N.E. Room 1A \nWashington, D.C.  20426 \nRe: \nPJM Interconnection L.L.C., Docket No. EL26-67-000 \nInformational Report on Stakeholder Processes Addressing Resource Adequacy for New \nLarge Loads \nDear Secretary Reese: \nAs directed by the Federal Energy Regulatory Commission’s (“Commission”) Order \nInstituting Proceeding Under Section 206 of the Federal Power Act (“FPA”) (“Show Cause \nOrder”),1 PJM submits this informational report to update the Commission on the current status of \nproposals under consideration in the stakeholder process to address the issue of resource adequacy \nto serve new large loads and other ongoing stakeholder processes that aim to increase the pace of \nadding generating capacity in the PJM Region. \nI.\nINFORMATIONAL FILING\nPJM has been working proactively to address the issue of resource adequacy for new large\nloads and to increase the pace of adding generating capacity in the PJM Region through myriad \nstakeholder processes.  As further explained below, this effort is most directly evidenced by the \nCritical Issue Fast Path (“CIFP”) for the development of a reliability backstop procurement \n(“RBP”) and a framework for service during periods of insufficient resource adequacy.2  These \n1 PJM Interconnection, L.L.C. et al., 195 FERC ¶ 61,211, at P 104 (2026) (“Show Cause Order”). \n2 See PJM Interconnection, L.L.C., Issue Charge: Reliability Backstop Procurement (Apr. 16, 2026),  \nhttps://www.pjm.com/-/media/DotCom/committees-groups/cifp-rbp/2026/20260416/20260416-item-04---cifp---rbp-\nissue-charge.pdf; PJM Interconnection, L.L.C., Issue Charge: Implementation of Connect and Manage (“CAM”)"},{"page":2,"startToken":282,"endToken":719,"text":"Honorable Debbie-Anne A. Reese, Secretary \nJuly 20, 2026 \nPage 2 of 11 \n \nefforts are further bolstered by stakeholder processes in the Connect and Manage Senior Task \nForce (“CAMSTF”), the Reserve Certainty Senior Task Force (“RCSTF”), the Powering \nReliability Through Market Design workshops, and the Interconnection Process Subcommittee \nwhich are also all detailed as part of this informational report.  Additionally, PJM’s proactive \nefforts to increase the pace of adding generating capacity in the PJM Region have resulted in four \naccepted proposals enhancing the interconnection process that PJM is implementing.3 \na. Stakeholder Processes Addressing Resource Adequacy to Serve New Large \nLoads \ni. Reliability Backstop Procurement and Framework for Service During \nPeriods of Insufficient Resource Adequacy \nPJM has recently conducted a stakeholder process through a CIFP that directly addresses \nthe issue of resource adequacy to serve new large loads.  Specifically, pursuant to the directive of \nthe PJM Board,4 PJM initiated a CIFP regarding the execution of an RBP and the implementation \nof a framework for service during periods of insufficient resource adequacy.5  The CIFP for RBP \n \nFramework for Large Load Interconnections (Mar. 25, 2026), https://www.pjm.com/-/media/DotCom/committees-\ngroups/task-forces/camstf/postings/connect-and-manage-issue-charge.pdf.  \n3 See  PJM Interconnection, L.L.C., 195 FERC ¶ 61,197, at P 22 (2026) (accepting PJM’s expedited interconnection \ntracking proposal as a separate and expedited interconnection process through which PJM would consider up to 10 \ninterconnection requests per calendar year for large new or uprated capacity resources); PJM Interconnection, \nL.L.C., 194 FERC ¶ 61,079 (2026) (accepting PJM’s proposal to facilitate the transfer of Capacity Interconnection \nRights from deactivating generation resources to new replacement generation resources);  PJM Interconnection, \nL.L.C., 190 FERC ¶ 61,083 (2025) (accepting PJM’s surplus interconnection service proposal to facilitate the rapid \nexpansion of existing and planned generating facilities on PJM’s system); PJM Interconnection, L.L.C., 190 FERC ¶ \n61,084 (2025) (accepting PJM’s reliability resource initiative enabling a one-time reliability-based expansion of \neligibility criteria for Transition Cycle 2 of PJM’s existing interconnection queue). \n4 PJM Interconnection, L.L.C., Board Letter to Stakeholders Initiating CIFP for RBP (Apr. 8, 2026), \nhttps://www.pjm.com/-/media/DotCom/about-pjm/who-we-are/public-disclosures/2026/20260408-cifp-rbp-\ninitiation-letter.pdf; PJM Interconnection, L.L.C., Board Letter to Stakeholders Incorporating CAM into CIFP for \nRBP (May 19, 2026), https://www.pjm.com/-/media/DotCom/about-pjm/who-we-are/public-\ndisclosures/2026/20260519-pjm-board-letter-re-reliability-backstop-procurement-connect-and-manage-cifp.pdf. \n5 See PJM, Issue Charge: Reliability Backstop Procurement (Apr. 16, 2026),  https://www.pjm.com/-\n/media/DotCom/committees-groups/cifp-rbp/2026/20260416/20260416-item-04---cifp---rbp-issue-charge.pdf; PJM, \nIssue Charge: Implementation of CAM Framework for Large Load Interconnections (Mar. 25, 2026),"},{"page":3,"startToken":719,"endToken":1036,"text":"Honorable Debbie-Anne A. Reese, Secretary \nJuly 20, 2026 \nPage 3 of 11 \nwas convened to address the evolving risk profile in the PJM Region by developing a proposal to \naddress backstop procurement which specifies core award parameters, such as price, term, and \nquantity, as well as cost allocation mechanisms to serve as a transitional measure towards \naddressing resource adequacy concerns while options for a more durable mechanism are evaluated \nas part of the broader market review.6   \nThe CIFP addressing service during periods of insufficient resource adequacy was \nconvened to focus on developing  a solution to both incentivize investment in generation and \nmanage the reliability challenges during the transitional period in which new load additions are \noutpacing the additions of new capacity in the PJM system.  This framework will provide PJM \noperators with a tool to maintain reliability while allowing all large loads to connect to the system. \nLarge loads that do not bring sufficient supply resources to the system to cover their requirements \nshould not negatively impact reliability for other load, and therefore these large loads may be \nrequired to reduce their withdrawals from the transmission system before PJM needs to curtail \nother load.7  Because these issues have linkage, the PJM Board moved to consolidate them into \none CIFP.8   \nhttps://www.pjm.com/-/media/DotCom/committees-groups/task-forces/camstf/postings/connect-and-manage-issue-\ncharge.pdf. \n6 See PJM Interconnection, L.L.C., Board Decisional Letter on Critical Issue Fast Path - Large Load Additions, at \n5-6 (Jan. 16, 2026), https://www.pjm.com/-/media/DotCom/about-pjm/who-we-are/public-\ndisclosures/2026/20260116-pjm-board-letter-re-results-of-the-cifp-process-large-load-additions.pdf.\n7 PJM, Issue Charge: Implementation of CAM Framework for Large Load Interconnections (Mar. 25, 2026), \nhttps://www.pjm.com/-/media/DotCom/committees-groups/task-forces/camstf/postings/connect-and-manage-issue-\ncharge.pdf. \n8 PJM, Board Letter to Stakeholders Incorporating CAM into CIFP for RBP (May 19, 2026), \nhttps://www.pjm.com/-/media/DotCom/about-pjm/who-we-are/public-disclosures/2026/20260519-pjm-board-letter-\nre-reliability-backstop-procurement-connect-and-manage-cifp.pdf."},{"page":4,"startToken":1036,"endToken":1457,"text":"Honorable Debbie-Anne A. Reese, Secretary \nJuly 20, 2026 \nPage 4 of 11 \n \nIn total, 24 proposals were submitted for consideration by PJM, the Independent Market \nMonitor for PJM, and various stakeholder groups.9  Of these proposals, 11 focused on a framework \nfor service during periods of insufficient resource adequacy while 13 were focused on the RBP \nmechanism.  Stakeholders made advisory votes on these proposals at the June 30, 2026 Special \nMembers Committee (“MC”) meeting, following the four-stage CIFP process which concluded \nthat same day.  PJM also sought feedback from stakeholders on specific topics through further \npolling, the results of which were finalized on July 10, 2026.10   \nBased on these discussions that took place over eight stakeholder meetings between April \n16 and June 30, 2026,11 and the results of the June 30, 2026 stakeholder advisory votes,12 the PJM \nBoard is currently deliberating on the final proposals that PJM will file with the Commission \nregarding RBP and a framework for service during periods of insufficient resource adequacy.  A \nfinalized RBP proposal is expected to be filed with the Commission on or around July 31, 2026, \nwith the goal of administering a reliability backstop procurement shortly after Commission \nacceptance of the proposal.  PJM intends to file a proposal related to a framework for service \n \n9 All 24 proposals are available on PJM’s website under the “Associated Materials” for the June 30, 2026 Special \nMC at: https://www.pjm.com/committees-and-groups/issue-tracking/issue-tracking-details.aspx?Issue=c5bb612d-\n5342-4b56-850e-4e520e902ec6.  \n10 PJM Interconnection, L.L.C., CIFP – Reliability Backstop Procurement / Connect & Manage,  \nSummarized Poll Results (2026), https://www.pjm.com/-/media/DotCom/committees-groups/cifp-rbp/postings/cifp-\npoll-results-with-comments.pdf.  \n11 PJM held stakeholder meetings regarding the CIFP for RBP on April 16 and 17 and May 4 and 5, 2026, and held \njoint meetings on the CIFP on May 27 and June 10, 11, and 30.  See PJM Interconnection, L.L.C., Critical Issue \nFast Path - Reliability Backstop Procurement / Connect & Manage, https://www.pjm.com/committees-and-\ngroups/cifp-rbp.  PJM had previously held seven meetings from February 6 through March 5, 2026 regarding RBP at \nthe Reliability Backstop Procurement Workshop. See PJM Interconnection, L.L.C., Reliability Backstop \nProcurement Workshop, https://www.pjm.com/committees-and-groups/workshops/rbpw. \n12 Voting results for all the proposals are available PJM’s MC webpage under the \"Meeting Materials” for the June \n30, 2026 MC meeting list as “MC Voting Results” for Agenda Item 3A – Agenda Item 3X; see PJM \nInterconnection, L.L.C., Members Committee, https://www.pjm.com/committees-and-groups/committees/mc."},{"page":5,"startToken":1457,"endToken":1808,"text":"Honorable Debbie-Anne A. Reese, Secretary \nJuly 20, 2026 \nPage 5 of 11 \n \nduring periods of insufficient resource adequacy shortly after the RBP filing, on or around August \n7, 2026. \nii. Large Load Customer Flexibility \nPJM’s large load customer flexibility initiative is also slated to address a Problem \nStatement13 and Issue Charge14 related to large load customer flexibility,15 which was approved by \nthe Markets and Reliability Committee (“MRC”) on March 25, 2026.16  This stakeholder process \nrecognizes the critical need to explore customer flexibility solutions that would allow certain large \nload customers to connect to the grid prior to completion of necessary transmission upgrades and \ntherefore seeks to develop the tools, processes, business rules, and regulatory changes required to \naddress large load customer flexibility, including load shed prioritization and allocation.17  In light \nof the Commission’s Show Cause Order, PJM is considering whether to explore the matter raised \nin this Problem Statement and Issue Charge as part of its response to the directives of that order.   \nSpecifically, PJM and stakeholders expect to develop an allocation framework whereby \nTransmission Owners and Load Serving Entities (“LSE”) have specific customer contractual load \n \n13 PJM Markets and Reliability Committee, Develop Process to Provide Large Load Customers Flexibility to \nConnect to the Transmission Grid in the PJM Region (Mar. 25, 2026) https://www.pjm.com/-\n/media/DotCom/committees-groups/committees/mrc/2026/20260325/20260325-item-02---2-exelon-large-load-\nflexibility-problem-statement.pdf.  \n14 PJM Markets and Reliability Committee, Large Load Customer Flexibility, Issue Charge (March 25, 2026) \nhttps://www.pjm.com/-/media/DotCom/committees-groups/committees/mrc/2026/20260325/20260325-item-02---3-\nexelon-large-load-flexibility-issue-charge.pdf.  \n15 Issue Tracking for PJM’s Large Load Customer Flexibility Issue Charge is available; see PJM Interconnection, \nL.L.C., Issue Details, Large Load Customer Flexibility, https://www.pjm.com/committees-and-groups/issue-\ntracking/issue-tracking-details.aspx?Issue=470a5f36-2ce2-4c82-8639-7d4bb9d0cafc.  \n16 PJM Markets and Reliability Committee, Minutes (Mar. 25, 2026), https://www.pjm.com/-\n/media/DotCom/committees-groups/committees/mc/2026/20260422/20260422-item-10a---mrc-report.pdf.  \n17 PJM Markets and Reliability Committee, Issue Charge: Large Load Customer Flexibility (Mar. 25, 2026), \nhttps://www.pjm.com/-/media/DotCom/committees-groups/committees/mrc/2026/20260325/20260325-item-02---3-\nexelon-large-load-flexibility-issue-charge.pdf."},{"page":6,"startToken":1808,"endToken":2109,"text":"Honorable Debbie-Anne A. Reese, Secretary \nJuly 20, 2026 \nPage 6 of 11 \n \nreduction guarantees with advanced notification of the potential magnitude of load reductions that \nmay be required under set PJM conditions.18  PJM, Transmission Owners, and stakeholders will \nexplore how to design load reduction allocations based on the contributions of any reducible load \nto the actual real time flowgate reliability issues they impact or to the shortfall to PJM’s required \nreserve margin and will develop options for temporary flexibility to offer loads until transmission \nupgrades are constructed, such as fully, partially, or storage matched options.19  The timing of this \nwork remains under review. \nb. Stakeholder Processes Aiming to Increase the Pace of Adding Generating \nCapacity in the PJM Region \ni. Increasing the Pace of Adding Generating Capacity Through Markets \n1. Powering Reliability Through Market Design \nFollowing the PJM Board’s January 16, 2026 Decisional Letter on the CIFP for Large Load \nAdditions directing staff to undertake a holistic review of the PJM capacity market design and \ninvestment incentives,20 PJM released a report on Powering Reliability Through Market Design.21  \nThis report delineated three potential paths forward:  (1) stabilizing PJM’s long-term market; (2) \nallowing for differential reliability between regions within the PJM Region; and (3) pursuing a \ntransition from reliance on the Reliability Pricing Model (“RPM”) for resource adequacy to the \nenergy and Ancillary Services markets.22  The first solution path preserves the existing capacity \n \n18 Id. \n19 Id. \n20 See PJM, Board Decisional Letter on Critical Issue Fast Path - Large Load Additions (Jan. 16, 2026), \nhttps://www.pjm.com/-/media/DotCom/about-pjm/who-we-are/public-disclosures/2026/20260116-pjm-board-letter-\nre-results-of-the-cifp-process-large-load-additions.pdf.  \n21 PJM Interconnection, L.L.C., Powering Reliability Through Market Design (May 6, 2026), \nhttps://www.pjm.com/-/media/DotCom/library/reports-notices/special-reports/2026/20260506-powering-reliability-\nthrough-market-design.pdf. \n22 Id. at 7."},{"page":7,"startToken":2109,"endToken":2415,"text":"Honorable Debbie-Anne A. Reese, Secretary \nJuly 20, 2026 \nPage 7 of 11 \n \nmarket and the long-standing compact of shared reliability in PJM but requires the vast majority \nof load to be covered through long-term forward commitments, either through mandatory LSE \nhedging or through centralized long-term procurement.23  The second path questions whether areas \nwithin PJM should be permitted to elect different reliability standards other than the 1-in-10 \nstandard used throughout the PJM Region now and explores making that potential rationing of \ncapacity in scarcity conditions deliberate, principled, and governable, on the basis of those \nelections.24  The third path considers moving away from relying as heavily on the capacity market \nfor contribution to the revenue required for investment in supply resources.  This path would \ninstead pursue a phased shift of the revenue recovery function from the capacity market to the \nenergy and Ancillary Services markets thereby reducing the region’s reliance on the capacity \nmarket as only a backstop mechanism to promote forward bilateral energy contracts as the primary \nhedging instrument for LSEs.25 \nPJM presented the report at the May 20, 2026 MRC meeting.26  Following the issuance of \nthe report, PJM scheduled a series of workshops to examine the choices presented in the paper and \nbegin to develop recommendations for consideration in the subsequent stakeholder process.  The \nfirst of these workshops was held on June 12, 2026.27  Additional workshops and opportunities for \n \n23 Id. at 29-36. \n24 Id. at 37-39. \n25 Id. at 39-44. \n26 PJM, Powering Reliability Through Market Design: Addressing Rising Demand and Constrained Supply, and \nSimulating Investment To Support Durable Reliability (May 20, 2026), https://videos.pjm.com/media/1_b6u45ufr.  \n27 PJM Interconnection, L.L.C., Agenda, Powering Reliability Through Market Design Workshop (June 12, 2026), \nhttps://www.pjm.com/-/media/DotCom/committees-groups/workshops/prtmdw/2026/20260612/20260612-\nagenda.pdf."},{"page":8,"startToken":2415,"endToken":2753,"text":"Honorable Debbie-Anne A. Reese, Secretary \nJuly 20, 2026 \nPage 8 of 11 \n \nsubmitting written comments will carry through August.28  PJM anticipates a more formal \nstakeholder process to follow the workshop sessions, culminating in a filing with the Commission \nin 2027. \n2. Reserve Certainty Reforms \nAs highlighted in PJM’s report, the RCSTF is developing enhancements to recalibrate \nreserve products and update reserve demand curves to better account for ramping and uncertainty \nand better align reserve pricing with operational practice.29  The PJM proposal put forward in the \nRCSTF is designed to provide more efficient economic incentives through enhanced products for \nresources participating in PJM’s Ancillary Services markets which should also help increase the \npace of adding new generating capacity to the PJM Region through improved market signals.  \nStakeholder discussion of this issue at the RCSTF concluded on June 25 and voting concluded on \nJuly 10.30  The proposal will be discussed at the August 24 MRC and voted on at the September \nMRC, with a final vote scheduled to take place at the October MC.31  If a proposal is endorsed by \nstakeholders, PJM plans to file that proposal with the Commission by the end of 2026.32   \n \n28 PJM Interconnection, L.L.C., Powering Reliability Through Market Design Workshops, \nhttps://www.pjm.com/committees-and-groups/workshops/prtmdw.  \n29 See also PJM Interconnection, L.L.C., Issue Charge: Reserve Certainty Senior Task Force (May 15, 2024), \nhttps://www.pjm.com/-/media/DotCom/committees-groups/task-forces/rcstf/2024/20240515/20240515-item-09a---\nrcstf-issue-charge---annotated-with-progress.pdf.  \n30 PJM Reserve Certainty Senior Task Force, RCSTF Summarized Voting Results Report (July 2026), \nhttps://www.pjm.com/-/media/DotCom/committees-groups/task-forces/rcstf/2026/20260625/20260625-\nsummarized-rcstf-voting-results-report-july-2026.pdf.   \n31 See PJM, RCSTF Vote Information and Overview, at 6 (June 25, 2026), https://www.pjm.com/-\n/media/DotCom/committees-groups/task-forces/rcstf/2026/20260625/20260625-item-04---rcstf-vote-information-\nand-overview.pdf.  \n32 Issue Tracking for PJM’s Large Load Customer Flexibility Issue Charge is available; see PJM, Issue Details, \nLarge Load Customer Flexibility, https://www.pjm.com/committees-and-groups/issue-tracking/issue-tracking-\ndetails.aspx?Issue=470a5f36-2ce2-4c82-8639-7d4bb9d0cafc."},{"page":9,"startToken":2753,"endToken":3016,"text":"Honorable Debbie-Anne A. Reese, Secretary \nJuly 20, 2026 \nPage 9 of 11 \n \nii. Increasing the Pace of Adding Generating Capacity Through \nInterconnection Reforms \n1. Expedited Interconnection Track \nOn June 9, 2026, the Commission issued an order accepting PJM’s proposed Expedited \nInterconnection Track (“EIT”) proposal.33  In so doing, the Commission found that PJM’s proposal \n“accomplishes the purposes of Order Nos. 2003 and 2023 by helping to ensure that interconnection \ncustomers are able to interconnect to the transmission system in a reliable, efficient, transparent, \nand timely manner” and that the “EIT proposal will help address PJM’s near-term resource \nadequacy needs by establishing a separate, time-limited, expedited interconnection process for a \nlimited number of resources that are able to bring significant capacity onto the system in the near-\nterm.”34   \nThe Commission found that the eligibility requirements proposed “are tailored to \naddressing near-term resource adequacy needs and appropriately limit EIT to capacity resources \nthat are more likely to timely contribute to meeting the region’s needs”35 thereby increasing the \npace of adding generating capacity in the PJM Region.  The EIT was developed through the \nCritical Issue Fast Path – Large Load Addition (“CIFP-LLA”) stakeholder process36 which \nculminated in a Special MC meeting on November 19, 2025.  During that process, PJM and \nstakeholders proposed multiple packages that included concepts around an expedited \n \n33 PJM Interconnection, L.L.C., 195 FERC ¶ 61,197, at P 22 (2026). \n34 Id. \n35 Id. \n36 Meeting information and materials can be found on the CIFP-LLA webpage; see PJM, Critical Issue Fast Path – \nLarge Load Additions, https://www.pjm.com/committees-and-groups/cifp-lla."},{"page":10,"startToken":3016,"endToken":3379,"text":"Honorable Debbie-Anne A. Reese, Secretary \nJuly 20, 2026 \nPage 10 of 11 \n \ninterconnection track.  In its January 16, 2026 letter following the CIFP-LLA, the Board directed \nPJM to file an EIT package which was formally noticed during the February 19, 2026 MC.37 \n2. Expansion of Provisional Service  \nPJM’s Interconnection Process Subcommittee (“IPS”) is currently exploring an issue \ncharge to expand provisional service by identifying under what circumstances generation projects \nthat advance to Phase III of a Cycle may be permitted to safely and reliably begin generating prior \nto their completion of certain Cycle studies without impacting the timing or fundamentally altering \nthe Generation Interconnection Procedures.38  The IPS intends to report the final results of polling \nrelated to this stakeholder effort to the Planning Committee in September 2026 for further \nconsideration.39  PJM is also assessing the impact of the Show Cause Order on this topic. \n3. Interconnection Process Subcommittee \n Additionally, PJM’s Interconnection Process Subcommittee continues to discuss the \nongoing interconnection cycle-based study process which has already made large improvements \nto increasing the pace of adding generating capacity.  PJM posted Phase II of its System Impact \nStudy reports on June 5, 2026, and is currently in Transition Cycle 2 Phase III, which started on \nJuly 8, 2026.40  This final phase is presently projected to culminate in the negotiation of final \n \n37 See PJM MC, Agenda (Feb. 19, 2026), https://www.pjm.com/-/media/DotCom/committees-\ngroups/committees/mc/2026/20260219/20260219-agenda.pdf; See PJM Interconnection, L.L.C., Proposed Tariff \nAmendments for Expedited Interconnection Track, Docket No. ER26-1563-000 (Feb. 27, 2026). \n38 PJM Interconnection, L.L.C., Issue Charge: Expansion of Provisional Service (Nov. 24, 2025), \nhttps://www.pjm.com/-/media/DotCom/committees-groups/subcommittees/ips/2025/20251124/20251124-item-05b-\n----expansion-of-provisional-service---issue-charge.pdf.  \n39 The most recent Interconnection Process Subcommittee report to the MC was provided on June 17, 2026; see PJM \nInterconnection Process Subcommittee, Monthly Process Report (June 17, 2026), https://www.pjm.com/-\n/media/DotCom/committees-groups/committees/mc/2026/20260624/20260624-item-12c---ips-report.pdf.  \n40 PJM Interconnection Process Subcommittee, Cycle Schedule Update, at 3 (June 26, 2026), https://www.pjm.com/-\n/media/DotCom/committees-groups/subcommittees/ips/2026/20260626/20260626-item-03---cycle-schedule-\nupdate.pdf."},{"page":11,"startToken":3379,"endToken":3569,"text":"Honorable Debbie-Anne A. Reese, Secretary \nJuly 20, 2026 \nPage 11 of 11 \n \nagreements by March 5, 2027.41  Furthermore, PJM continues to make significant progress \nregarding cycle service requests.   As of May 15, 2026, PJM has received a total of 829 applications \nunder Cycle 1, totaling approximately 212,000 MWs of new capacity currently under review.42   \nII. \nCONCLUSION \nPJM requests the Commission accept this informational report as responsive to the \nCommission’s directive from the Show Cause Order.43 \nRespectfully submitted, \n/s/ Daniel Vinnik \nCraig Glazer \nVice President – Federal Government Policy \nPJM Interconnection, L.L.C. \n1200 G Street, N.W. \nSuite 600 \nWashington, D.C. 20005 \n(202) 423-4743 \nCraig.Glazer@pjm.com \n \nDaniel Vinnik \nCounsel \nPJM Interconnection, L.L.C. \n2750 Monroe Boulevard \nAudubon, PA* 19403 \n*(Licensed in the District of \nColumbia and Illinois) \n(267) 858-9451 \nDaniel.Vinnik@pjm.com  \n \n \n \nOn behalf of \nPJM Interconnection, L.L.C. \n \n41 Id.  \n42 PJM Interconnection Process Subcommittee, Cycle Schedule Update, at 8 (May 26, 2026), https://www.pjm.com/-\n/media/DotCom/committees-groups/subcommittees/ips/2026/20260526/20260526-item-01---ips-cycle-update.pdf.  \n43 See Show Cause Order, 195 FERC ¶ 61,211 at P 104."},{"page":12,"startToken":3569,"endToken":3633,"text":"CERTIFICATE OF SERVICE \nI hereby certify that I have this 20th day of July, 2026 caused a copy of the foregoing \ndocument to be served upon each person designated on the official service list compiled by the \nSecretary in this proceeding. \n/s/ Daniel Vinnik \nDaniel Vinnik \nCounsel \nPJM Interconnection, L.L.C. \n2750 Monroe Boulevard \nAudubon, PA 19403 \n(267) 858-9451 \nDaniel.Vinnik@pjm.com"}],"sections":[{"p":1,"at":0,"title":"Opening text","method":"opening text","endPage":1,"endAt":976,"startToken":0,"endToken":145},{"p":1,"at":976,"title":"I. INFORMATIONAL FILING","method":"printed heading","endPage":11,"endAt":361,"startToken":145,"endToken":3436},{"p":11,"at":361,"title":"II. CONCLUSION","method":"printed heading","endPage":12,"endAt":0,"startToken":3436,"endToken":3569},{"p":12,"at":0,"title":"CERTIFICATE OF SERVICE","method":"printed heading","endPage":12,"endAt":391,"startToken":3569,"endToken":3633}]}
