# Sec. 1104. Cooperation of agencies; reports; availability of information; recommendations; international and national coordination of efforts

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/1104)

## Summary

Conforming edits to NEPA section 102(2): agencies must develop methods consistent with data and technology standards for eNEPA technologies, and 'responsible official' becomes 'lead agency'. ([p. 27, line 1 to p. 27, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=27))

## Key points

- Ties agency NEPA methods to eNEPA technology standards ([p. 27, line 1 to p. 27, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=27))

## Selected statutory quotes

> are consistent with the requirements for minimum functional requirements and data and technology standards for agency implementation of eNEPA technologies

[p. 27, line 1 to p. 27, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=27)

Agency NEPA methods must meet the new data and technology standards.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

Technical; adds the eNEPA technology reference.

### EPRA 2024 (reported S. 4753)

Not in EPRA 2024.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 26, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=26) (indent level 0)

Section 102(2) of the National Environmental Policy Act of 1969 (42 U.S.C. 4332(2)) is amended—

[p. 26, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=26) (indent level 2)

(1) by striking subparagraph (B) and inserting the following:

[p. 26, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=26) (indent level 3)

“(B) identify and develop methods and procedures, to implement the requirements of this Act, in consultation with the Chairman, that—

[p. 26, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=26) (indent level 4)

“(i) will ensure that presently unquantified environmental amenities and values may be given appropriate consideration in decisionmaking along with economic and technical considerations; and

[p. 27, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=27) (indent level 4)

“(ii) are consistent with the requirements for minimum functional requirements and data and technology standards for agency implementation of eNEPA technologies;”;

[p. 27, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=27) (indent level 2)

(2) in subparagraph (C)—

[p. 27, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=27) (indent level 3)

(A) in the matter preceding clause (i), by striking “responsible official” and inserting “lead agency”;

[p. 27, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=27) (indent level 3)

(B) by indenting clauses (i) through (v) appropriately;

[p. 27, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=27) (indent level 3)

(C) in clause (ii), by striking “proposal” and inserting “proposed agency action”;

[p. 27, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=27) (indent level 3)

(D) in clause (v), by striking the period at the end and inserting a semicolon; and

[p. 27, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=27) (indent level 3)

(E) in the undesignated matter following clause (v), in the second sentence—

[p. 27, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=27) (indent level 4)

(i) by striking “Council on Environmental Quality” and inserting “Council”; and

[p. 27, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=27) (indent level 4)

(ii) by striking “proposal” and inserting “proposed agency action”; and

[p. 27, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=27) (indent level 2)

(3) in subparagraph (L), by striking “Council on Environmental Quality established by title II of this Act” and inserting “Council”.

