# Sec. 1131. Definitions

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/1131)

## Summary

Definitions for the permitting tracker subtitle. ([p. 96, line 11 to p. 96, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=96)) A 'transparency project' is any action that needs an EIS, or an environmental assessment still unfinished 13 months past its deadline. ([p. 97, line 11 to p. 97, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=97))

## Key points

- Every EIS project becomes a tracked transparency project ([p. 97, line 8 to p. 97, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=97))

## Selected statutory quotes

> a proposed agency action requiring the preparation of an environmental impact statement

[p. 97, line 8 to p. 97, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=97)

Every project with an impact statement goes on the tracker.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

New.

### EPRA 2024 (reported S. 4753)

Not in EPRA 2024.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 96, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=96) (indent level 0)

In this subtitle:

[p. 96, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=96) (indent level 2)

(1) APPLICABLE DEADLINES.—The term “applicable deadlines” means the deadlines described in section 107(g) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(g)).

[p. 96, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=96) (indent level 2)

(2) APPLICABLE SCHEDULE.—The term “applicable schedule” means the schedule established for a transparency project under subsection (a)(1)(C)(iv) of section 107 of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a).

[p. 96, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=96) (indent level 2)

(3) NEPA TERMS.—The terms “authorization”, “Chairman”, “Council”, “environmental assessment”, “environmental impact statement”, “environmental review”, “key permitting agency”, “lead agency”, “project sponsor”, and “statement of purpose and need” have the meanings given those terms in section 3 of the National Environmental Policy Act of 1969.

[p. 97, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=97) (indent level 2)

(4) TRACKER.—The term “Tracker” means the Environmental Review and Permitting Tracker required under section 1132.

[p. 97, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=97) (indent level 2)

(5) TRANSPARENCY PROJECT.—The term “transparency project” means—

[p. 97, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=97) (indent level 3)

(A) a proposed agency action requiring the preparation of an environmental impact statement; or

[p. 97, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=97) (indent level 3)

(B) a proposed agency action requiring the preparation of an environmental assessment that has not been completed by the date that is 13 months after the deadline established for the project under paragraph (1)(A) of section 107(g) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(g)).

