# Sec. 1202. Clean Water Act permitting and State certification

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/1202)

## Summary

Rewrites Clean Water Act section 401 state certification. ([p. 103, line 12 to p. 103, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=103)) Certification is limited to water quality requirements. ([p. 104, line 19 to p. 104, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=104)) A state may deny only on clear and convincing evidence that no condition could make the project comply, and may impose only conditions that are necessary, least burdensome, and consistent with the federal permit. ([p. 105, line 3 to p. 105, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=105))

The process gets a prefiling meeting, a defined complete application, and a 3-day receipt acknowledgment. ([p. 111, line 2 to p. 111, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=111)) A 90-day completeness notice and a review period of up to 1 year follow. ([p. 111, line 11 to p. 111, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=111)) The period can be extended only if the applicant asks in writing and the certifying authority agrees in writing. ([p. 115, line 17 to p. 115, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=115)) Silence is a waiver. ([p. 115, line 10 to p. 115, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=115)) Denials must name the specific water quality requirement violated. ([p. 114, line 1 to p. 114, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=114)) On judicial review the burden of proof falls on the state by clear and convincing evidence. ([p. 117, line 5 to p. 117, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=117))

For interstate gas pipelines and bulk-power transmission lines, certification covers only direct point source discharges and must be decided within 9 months. ([p. 121, line 15 to p. 121, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=121))

## Key points

- Certification scope narrowed to water quality requirements; clear-and-convincing standard for denials ([p. 104, line 19 to p. 104, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=104))
- One-year cap, extendable only at the applicant's written request and with the certifying authority's written agreement ([p. 115, line 19 to p. 115, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=115))
- Burden of proof on the state in court ([p. 117, line 5 to p. 117, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=117))
- Interstate pipelines and transmission lines: point-source discharges only, 9-month clock ([p. 121, line 15 to p. 121, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=121))

## What others say it would do

Outside readings, quoted from their sources. These are claims about effects, not findings of this tracker.

- **Food & Water Watch** (Environmental groups; opposes): The bill would fast-track AI data centers and limit states' power to protect water resources.
  > This bill is a power grab by Big Tech and the fossil fuel industry to fast-track AI data centers and their egregious thirst for energy and water, while limiting the ability of states to protect water resources.
  [Food & Water Watch, 2026-09-30](https://www.foodandwaterwatch.org/2026/09/30/bipartisan-permitting-reform-plan-is-danger-to-public-health-enviro-protection-states-rights/). On the bill text at [p. 105, line 1 to p. 105, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=105).
- **Oil & Gas Journal** (Reporting; explains): Interstate gas pipelines would face less overlapping uncertainty from federal review and state water-quality certification.
  > The changes could reduce regulatory and litigation uncertainty for interstate gas pipelines, which are often subject to both federal environmental reviews and state water-quality certifications.
  [Oil & Gas Journal, 2026-10-01](https://www.ogj.com/general-interest/government/news/55408949/us-senate-negotiators-reach-permitting-bill-deal-ending-yearslong-impasse). On the bill text at [p. 105, line 1 to p. 105, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=105).
- **King & Spalding** (Lawyers and legal scholars; explains): States' power to deny Section 401 certification narrows sharply: clear and convincing evidence for denials and a burden on states to justify conditions.
  > A state could deny certification only on clear and convincing evidence that no modification would allow the project to meet water quality standards.
  [King & Spalding, 2026-10-02](https://www.kslaw.com/Insights/Articles/The-Senate-Permitting-Deal-What-It-Would-Change-and-What-to-Do-Now). On the bill text at [p. 105, line 1 to p. 105, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=105).
- **McGuireWoods** (Lawyers and legal scholars; explains): Tighter Section 401 standards would make it harder for individual states to block projects.
  > making it more difficult for individual states to block projects.
  [McGuireWoods, 2026-10-02](https://www.mcguirewoods.com/client-resources/alerts/2026/10/bipartisan-american-affordability-and-jobs-act-of-2026-proposes-sweeping-reform-for-energy-and-infrastructure-projects/). On the bill text at [p. 105, line 1 to p. 105, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=105).
- **NRDC** (Environmental groups; opposes): The Section 401 changes would make it harder for states and tribes to protect their waters from oil and gas pipelines.
  > it would also hamstring states and Tribes from using another Clean Water Act authority to protect their waters from spills and contaminated runoff from oil and gas pipelines
  [NRDC (blog), 2026-10-02](https://www.nrdc.org/bio/christy-goldfuss/hard-questions-permitting-bill). On the bill text at [p. 105, line 1 to p. 105, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=105).
- **Southern Environmental Law Center** (Environmental groups; opposes): SELC says the bill's statute of limitations and limits on state, tribal and local water authority would reduce communities' ability to challenge energy projects such as gas pipelines.
  > Restricts the ability of states, tribes, and local communities to protect local waterways and drinking water supplies threatened by large energy projects, like gas pipelines.
  [SELC press release, 2026-09-30](https://www.selc.org/?p=44520). On the bill text at [p. 68, line 1 to p. 68, line 2](https://pranava0x0.github.io/permittingreform/bill.pdf#page=68).

## Selected statutory quotes

> no certifying authority may— “(i) deny certification for any reason other than making a determination by clear and convincing evidence that no modification to or reasonable condition on the certification would make it possible to grant the certification without violating water quality requirements

[p. 104, line 24 to p. 105, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=104)

A state can deny only when no condition could make the project comply.

> a court shall place the burden of proof on the certifying authority to demonstrate, by clear and convincing evidence, that no reasonable modifications to or reasonable conditions on the certification would make it possible to grant the certification

[p. 117, line 5 to p. 117, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=117)

In court, the state carries the burden of proof.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

Section 401 lets states certify that a discharge complies with state water quality standards and 'any other appropriate requirement of State law', with a reasonable period not to exceed 1 year; EPA's 2020 and 2023 rules fought over the scope. The bill codifies a narrow scope similar to the 2020 rule, adds the clear-and-convincing standard and the point-source-only rule for pipelines and transmission.

### EPRA 2024 (reported S. 4753)

Not in EPRA 2024; Senate Republicans had sought section 401 limits in earlier bills such as Capito's 2023 RESTART Act.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 103, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=103) (indent level 0)

Section 401 of the Federal Water Pollution Control Act (33 U.S.C. 1341) is amended by adding at the end the following:

[p. 103, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=103) (indent level 1)

“(e) CERTIFICATION PROCEDURES, REQUIREMENTS, AND LIMITATIONS.—

[p. 103, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=103) (indent level 2)

“(1) EFFECT OF CERTAIN CERTIFICATION ACTIONS.—

[p. 103, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=103) (indent level 3)

“(A) CERTIFICATION OR WAIVER.—If a certifying authority grants a certification application or if a certifying authority waives the certification requirement for a certification application, the agency with jurisdiction over the Federal license or permit for which the certification application was made shall consider water quality requirements satisfied for the purpose of considering the application for the Federal license or permit.

[p. 104, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=104) (indent level 3)

“(B) CERTIFICATION WITH CONDITIONS.—

[p. 104, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=104) (indent level 4)

“(i) IN GENERAL.—If a certifying authority grants a certification application with conditions, the agency with jurisdiction over the Federal license or permit for which the certification application was made shall consider water quality requirements satisfied for the purpose of considering the application for the Federal license or permit, subject to the conditions included in the certification.

[p. 104, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=104) (indent level 4)

“(ii) SAVINGS CLAUSE.—Nothing in this subparagraph affects paragraph (2)(B).

[p. 104, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=104) (indent level 2)

“(2) SCOPE OF CERTIFICATION.—

[p. 104, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=104) (indent level 3)

“(A) IN GENERAL.—The scope of a certification provided under this section shall be limited to ensuring compliance with water quality requirements.

[p. 104, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=104) (indent level 3)

“(B) PROHIBITION.—In reviewing a certification application, no certifying authority may—

[p. 105, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=105) (indent level 4)

“(i) deny certification for any reason other than making a determination by clear and convincing evidence that no modification to or reasonable condition on the certification would make it possible to grant the certification without violating water quality requirements; or

[p. 105, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=105) (indent level 4)

“(ii) grant certification with conditions, except for conditions that the certifying authority determines by clear and convincing evidence are—

[p. 105, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=105) (indent level 5)

“(I) necessary to ensure compliance with water quality requirements;

[p. 105, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=105) (indent level 5)

“(II) the least burdensome conditions to ensure compliance with water quality requirements; and

[p. 105, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=105) (indent level 5)

“(III) consistent with the requirements of the Federal license or permit for which the certification application was made.

[p. 105, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=105) (indent level 3)

“(C) SAVINGS PROVISION.—Nothing in this paragraph allows a Federal licensing or permitting agency to refuse to include conditions from a certifying authority in a Federal license or permit if the conditions are necessary to ensure compliance with water quality requirements.

[p. 106, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=106) (indent level 2)

“(3) REQUIRED PROCEDURES.—

[p. 106, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=106) (indent level 3)

“(A) NOTICE AND HEARINGS.—Taking into account State or Tribal law, as appropriate, and the review period described in paragraph (4), each certifying authority shall establish procedures for—

[p. 106, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=106) (indent level 4)

“(i) public notice in the case of all certification applications;

[p. 106, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=106) (indent level 4)

“(ii) to the extent the certifying authority determines to be appropriate, public hearings in connection with specific certification applications; and

[p. 106, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=106) (indent level 4)

“(iii) a prefiling meeting as described in subparagraph (B).

[p. 106, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=106) (indent level 3)

“(B) PREFILING MEETING.—

[p. 106, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=106) (indent level 4)

“(i) REQUEST.—Before submitting a certification application, the prospective applicant may request a prefiling meeting with the certifying authority—

[p. 106, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=106) (indent level 5)

“(I) to ensure that the certifying authority receives early notification of projects for which a certification under subsection (a) is necessary; and

[p. 107, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=107) (indent level 5)

“(II) to discuss informational needs with the certifying authority before submitting the application.

[p. 107, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=107) (indent level 4)

“(ii) RESPONSE REQUIRED.—If a prospective applicant requests a prefiling meeting with a certifying authority pursuant to clause (i), the certifying authority shall—

[p. 107, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=107) (indent level 5)

“(I) respond to the request not later than 30 days after the date on which the request is received; and

[p. 107, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=107) (indent level 5)

“(II) hold the prefiling meeting with the prospective applicant not later than 60 days after the date on which the request is received.

[p. 107, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=107) (indent level 3)

“(C) CERTIFICATION APPLICATIONS.—

[p. 107, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=107) (indent level 4)

“(i) APPLICATION IN WRITING.—A certification application shall be made in writing to the applicable certifying authority.

[p. 107, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=107) (indent level 4)

“(ii) REQUIREMENTS FOR COMPLETE APPLICATION.—A complete certification application shall consist of the following:

[p. 107, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=107) (indent level 5)

“(I) Identification of each applicant for the Federal license or permit with respect to which the certification application is made.

[p. 108, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=108) (indent level 5)

“(II) A statement that information included in the certification application is truthful, accurate, and complete, to the best knowledge of each such applicant.

[p. 108, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=108) (indent level 5)

“(III) In the case of a certification application with respect to an individual permit or license—

[p. 108, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=108) (indent level 6)

“(aa) identification of the Federal license or permit that is the subject of the certification application with respect to which the certification is requested;

[p. 108, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=108) (indent level 6)

“(bb) identification of any activity the conduct of which is subject to the Federal license or permit;

[p. 108, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=108) (indent level 6)

“(cc) identification of the location and nature of any discharge that may result from the activity, and the location of the receiving waters;

[p. 109, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=109) (indent level 6)

“(dd) a description of means that may be used to monitor, control, or manage any such discharge; and

[p. 109, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=109) (indent level 6)

“(ee) a list of all other Federal, interstate, Tribal, State, or local agency authorizations related to the requirement for a certification under subsection (a), and any approval or denial of such an authorization already received.

[p. 109, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=109) (indent level 5)

“(IV) Any additional materials required by the applicable certifying authority pursuant to clause (iii), subject to the condition that the additional materials shall only be required with respect to certification applications submitted after the date on which the regulation described in that clause has been promulgated.

[p. 109, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=109) (indent level 4)

“(iii) ADDITIONAL MATERIALS.—

[p. 109, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=109) (indent level 5)

“(I) IN GENERAL.—A certifying authority may promulgate regulations establishing materials to be required in completed certification applications in addition to the materials described in subclauses (I) through (III) of clause (ii) that the certifying authority determines are necessary to demonstrate to the certifying authority compliance with water quality requirements.

[p. 110, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=110) (indent level 5)

“(II) REQUIREMENT.—In promulgating regulations under subclause (I), a certifying authority shall only base the determination regarding what additional materials are needed on what can reasonably be expected of an applicant at the time at which a certification application is submitted.

[p. 110, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=110) (indent level 5)

“(III) EFFECT OF FAILURE TO PROMULGATE.—If a certifying authority fails to promulgate regulations under subclause (I), a certification application to that certifying authority shall be considered complete if the certification application includes all of the items described in subclauses (I) through (III) of clause (ii).

[p. 111, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=111) (indent level 4)

“(iv) ACKNOWLEDGMENT OF RECEIPT.— Not later than 3 days after the date on which an applicant submits to a certifying authority a certification application for an individual Federal license or permit, the certifying authority shall acknowledge receipt of the certification application in writing.

[p. 111, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=111) (indent level 4)

“(v) NOTIFICATION OF COMPLETE APPLICATION OR IDENTIFICATION OF MISSING MATERIALS.—Not later than 90 days after the date on which a certifying authority acknowledges receipt of a certification application under clause (iv), the certifying authority shall—

[p. 111, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=111) (indent level 5)

“(I) provide the applicant a written notification that the certification application is complete; or

[p. 111, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=111) (indent level 5)

“(II) identify to the applicant in writing all specific additional materials or information described in clause (ii) necessary for the certification application to be considered complete, including, for each such additional piece of material or information, a description of the water quality requirement for which the additional material or information is needed in order to evaluate compliance with that water quality requirement.

[p. 112, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=112) (indent level 4)

“(vi) PETITION TO COURT.—

[p. 112, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=112) (indent level 5)

“(I) RIGHT TO PETITION.—An applicant may petition for judicial review of an alleged failure by a certifying authority to act in accordance with clauses (ii) through (v) by filing a written petition in a court of competent jurisdiction.

[p. 112, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=112) (indent level 5)

“(II) CONSIDERATIONS.—In reviewing a petition under this subclause, a reviewing court shall consider—

[p. 112, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=112) (indent level 6)

“(aa) the administrative record, which shall consist of the materials required to be submitted under clause (ii);

[p. 112, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=112) (indent level 6)

“(bb) any materials or information identified by certifying authority as missing pursuant to a notification under clause (v)(II);

[p. 113, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=113) (indent level 6)

“(cc) the information submitted by the applicant to the certifying authority; and

[p. 113, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=113) (indent level 6)

“(dd) any evidence presented to the court by the applicant that suggests that the defense of the certifying authority to the petition is pretextual.

[p. 113, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=113) (indent level 5)

“(III) COURT ORDER.—If a court, in reviewing a petition under this clause, finds that a certifying authority has failed to act in accordance with any of clauses (ii), (iv), and (v), the court shall provide injunctive relief, as appropriate, to give effect to this section.

[p. 113, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=113) (indent level 3)

“(D) DENIALS OF CERTIFICATION FOR INDIVIDUAL LICENSE OR PERMIT.—If a certifying authority denies a certification application for an individual license or permit, the certifying authority shall provide to the applicant and the applicable Federal licensing or permitting agency—

[p. 114, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=114) (indent level 4)

“(i) the specific water quality requirements that the certifying authority determined will be violated if certification were granted;

[p. 114, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=114) (indent level 4)

“(ii) a statement explaining why the certifying authority determined the identified water quality requirements will be violated; and

[p. 114, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=114) (indent level 4)

“(iii) if the denial is due to insufficient information, a description of the specific water quality data or information, if any, that would be needed to evaluate whether granting certification will comply with water quality requirements.

[p. 114, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=114) (indent level 2)

“(4) REVIEW PERIOD.—

[p. 114, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=114) (indent level 3)

“(A) IN GENERAL.—Subject to subparagraph (C) and in consultation with each certifying authority, a licensing or permitting agency shall, categorically or on a case-by-case basis for each certification application, establish a reasonable period of time (not to exceed 1 year from the date of receipt of the certification application) within which a certifying authority shall issue a final action on the certification application, which shall account for time required under applicable State or Tribal law for public notice and comment periods, if any.

[p. 115, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=115) (indent level 3)

“(B) FAILURE TO ACT.—If a certifying authority fails or refuses to issue a final action as described in paragraph (6) on a certification application by the end of the reasonable period of time established under subparagraph (A) and the reasonable period of time has not been extended in accordance with subparagraph (C), the requirement for a certification under subsection (a) shall be waived, except that the reasonable period of time shall restart in the event that the certification application is voluntarily withdrawn by the applicant and the applicant submits a new certification application.

[p. 115, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=115) (indent level 3)

“(C) REQUIREMENT FOR EXTENSION.— With respect to a certification application, the reasonable period of time established under subparagraph (A) may only be extended if—

[p. 115, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=115) (indent level 4)

“(i) the extension is requested, in writing, by the applicant; and

[p. 115, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=115) (indent level 4)

“(ii) the certifying authority concurs, in writing, with the extension.

[p. 115, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=115) (indent level 2)

“(5) WAIVER OF CERTIFICATION REQUIREMENT.—

[p. 116, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=116) (indent level 3)

“(A) IN GENERAL.—A certifying authority may, at any time during the reasonable period of time described in paragraph (4), affirmatively waive the requirement for a certification under subsection (a).

[p. 116, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=116) (indent level 3)

“(B) NO JUDICIAL REVIEW.—Notwithstanding any other provision of Federal law, including any provision of this section, a waiver of the requirement for a certification under this section shall not be subject to judicial review.

[p. 116, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=116) (indent level 2)

“(6) FINAL ACTION.—Not later than the date on which the reasonable period of time established under paragraph (4) for a certification application ends or on the date of a waiver pursuant to paragraph (5)(A), as applicable, the certifying authority shall apply only 1 of the following final actions to the certification application:

[p. 116, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=116) (indent level 3)

“(A) The certification application is granted.

[p. 116, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=116) (indent level 3)

“(B) The certification application is granted with conditions.

[p. 116, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=116) (indent level 3)

“(C) The certification application is denied.

[p. 116, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=116) (indent level 3)

“(D) The certification requirements under subsection (a) have been waived in accordance with paragraph (4) or (5) with respect to the certification application.

[p. 117, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=117) (indent level 1)

“(f) JUDICIAL REVIEW.—

[p. 117, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=117) (indent level 2)

“(1) BURDENS OF PROOF.—When reviewing a denial of a certification under this section, a court shall place the burden of proof on the certifying authority to demonstrate, by clear and convincing evidence, that no reasonable modifications to or reasonable conditions on the certification would make it possible to grant the certification without violating water quality requirements.

[p. 117, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=117) (indent level 2)

“(2) CONDITIONS.—When reviewing a challenge to 1 or more conditions required by a certifying authority under this section, a court shall place the burden of proof on the certifying authority to demonstrate, by clear and convincing evidence, that the 1 or more challenged conditions are—

[p. 117, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=117) (indent level 3)

“(A) necessary to allow the certification to be made without violating water quality requirements;

[p. 117, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=117) (indent level 3)

“(B) the least burdensome condition or set of conditions for avoiding violation of water quality requirements; and

[p. 118, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=118) (indent level 3)

“(C) consistent with the requirements of the Federal license or permit that is the subject of the certification.

[p. 118, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=118) (indent level 1)

“(g) SPECIAL RULE FOR CERTAIN CERTIFICATIONS.—

[p. 118, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=118) (indent level 2)

“(1) DEFINITION OF INTERSTATE TRANSMISSION LINE PROJECT.—In this subsection, the term ‘interstate transmission line project’ means a project for the construction, modification, or upgrade of a transmission facility that is part of the bulk-power system (as defined in section 215(a) of the Federal Power Act (16 U.S.C. 824o(a))).

[p. 118, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=118) (indent level 2)

“(2) LIMITATION ON CERTIFICATION REQUIREMENTS FOR CERTAIN INTERSTATE LINEAR INFRASTRUCTURE.— Notwithstanding the first sentence of subsection (a)(1), any applicant for a certificate of public convenience and necessity for a project under section 7 of the Natural Gas Act (15 U.S.C. 717f) or a Federal authorization or permit required to construct, modify, or operate an interstate transmission line project that may result in a direct point source discharge into the waters of the United States shall provide to the Federal licensing or permitting agency a certification from a certifying authority that such direct point source discharge complies with water quality requirements.

[p. 119, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=119) (indent level 2)

“(3) CERTIFICATION OF NO LIMITATION AND STANDARD.—In the case of any direct point source discharge described in this subsection for which there is not an applicable effluent limitation or other limitation under sections 301(b) and 302 and for which there is not an applicable standard under sections 306 and 307, the certifying authority shall so certify, except that such a certification shall not satisfy section 511(c).

[p. 119, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=119) (indent level 2)

“(4) REVIEW FOR COMPLIANCE.—Notwithstanding subsection (a)(4)—

[p. 119, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=119) (indent level 3)

“(A) prior to the initial operation of any federally licensed or permitted facility or activity that may result in a direct point source discharge into the waters of the United States and with respect to which a certification has been obtained pursuant to this subsection, which facility or activity is not subject to a Federal operating license or permit, the licensee or permittee shall provide an opportunity for the certifying authority to review the manner in which the facility or activity shall be operated or conducted for the purposes of assuring that applicable effluent limitations or other limitations or other applicable water quality requirements will not be violated;

[p. 120, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=120) (indent level 3)

“(B) on notification by the certifying authority that the operation of any federally licensed or permitted facility or activity described in subparagraph (A) will violate applicable effluent limitations or other limitations or other water quality requirements, the applicable Federal agency may, after public hearing, suspend the Federal license or permit; and

[p. 120, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=120) (indent level 3)

“(C) if a Federal license or permit is suspended pursuant to subparagraph (B), the Federal license or permit shall remain suspended until notification is received from the certifying authority that there is reasonable assurance that the facility or activity will not violate the applicable provisions of sections 301, 302, 303, 306, and 307.

[p. 120, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=120) (indent level 2)

“(5) LIMITATION AND MONITORING REQUIREMENTS OF CERTAIN LINEAR INFRASTRUCTURE CERTIFICATIONS.— Notwithstanding subsection (d)—

[p. 120, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=120) (indent level 3)

“(A) any certification provided under this subsection shall set forth any effluent limitations and other limitations and monitoring requirements necessary to assure that any direct point source discharge subject to this subsection will comply with the applicable provisions of sections 301, 302, 303, 306, and 307; and

[p. 121, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=121) (indent level 3)

“(B) any limitations and requirements set forth pursuant to subparagraph (A) shall be imposed by the licensing or permitting agency as a condition on any Federal license or permit subject to the provisions of this section.

[p. 121, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=121) (indent level 2)

“(6) REASONABLE PERIOD OF TIME.—Notwithstanding the periods of time in subsections (a)(1) and (e)(4), a licensing or permitting agency shall, categorically or on a case-by-case basis for each certification application, establish a reasonable period of time (not to exceed 9 months from the date of receipt of the certification application) within which a certifying authority shall issue a final action on the certification application under this subsection, which shall account for the time required under applicable State or Tribal law for public notice and comment periods.

[p. 121, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=121) (indent level 1)

“(h) DEFINITIONS.—In this section:

[p. 121, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=121) (indent level 2)

“(1) CERTIFICATION APPLICATION.—The term ‘certification application’ means a request from an applicant for a certification described in subsection (a).

[p. 122, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=122) (indent level 2)

“(2) CERTIFYING AUTHORITY.—The term ‘certifying authority’, with respect to a certification application, means, as applicable—

[p. 122, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=122) (indent level 3)

“(A) the State or interstate agency to which the certification application was submitted, including an Indian Tribe that is treated as a State for purposes of this section pursuant to section 131.8 of title 40, Code of Federal Regulations; or

[p. 122, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=122) (indent level 3)

“(B) if no State or interstate agency has the authority to provide the certification described in subsection (a), the Administrator.

[p. 122, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=122) (indent level 2)

“(3) WATER QUALITY REQUIREMENTS.—The term ‘water quality requirements’ means—

[p. 122, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=122) (indent level 3)

“(A) the applicable provisions of sections 301, 302, 303, 306, and 307; and

[p. 122, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=122) (indent level 3)

“(B) any Federal and State or Tribal laws (including regulations) implementing sections 301, 302, 303, 306, and 307 that are applicable to discharges into waters of the United States.”.