# Sec. 1203. Permit term for NPDES permits

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/1203)

## Summary

Extends the maximum term of state-issued NPDES discharge permits from 5 years to 10 years. ([p. 123, line 3 to p. 123, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=123))

## Key points

- 10-year NPDES permits ([p. 123, line 3 to p. 123, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=123))

## What others say it would do

Outside readings, quoted from their sources. These are claims about effects, not findings of this tracker.

- **National Association of Home Builders** (Industry; supports): Home builders expect larger Nationwide Permit acreage thresholds and 10-year Clean Water Act permit terms to bring clarity and consistency.
  > including an increase in acreage thresholds under the Clean Water Act’s (CWA) Nationwide Permit program along with extending the statutory timeframe from five to 10 years for the CWA permit programs.
  [NAHB, 2026-10-01](https://www.nahb.org/news-and-economics/press-releases/2026/10/nahb-applauds-bipartisan-american-affordability-and-jobs-act). On the bill text at [p. 123, line 3 to p. 123, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=123).

## Selected statutory quotes

> by striking “five years” and inserting “10 years”.

[p. 123, line 3 to p. 123, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=123)

The whole section.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

5 years.

### EPRA 2024 (reported S. 4753)

Not in EPRA 2024.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 123, line 2](https://pranava0x0.github.io/permittingreform/bill.pdf#page=123) (indent level 0)

Section 402(b)(1)(B) of the Federal Water Pollution Control Act (33 U.S.C. 1342(b)(1)(B)) is amended by striking “five years” and inserting “10 years”.

