# Sec. 1302. Timeline for Section 7 consultations

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/1302)

## Summary

Shortens ESA section 7 formal consultation from 90 to 60 days, and the applicant-consent extension from 150 to 100 days. ([p. 134, line 16 to p. 134, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=134)) If consultation stretches past 145 days without the applicant's written consent, the applicant may sue under the APA for agency action unlawfully withheld. ([p. 135, line 23 to p. 135, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=135)) Consultation on any project with a NEPA document must finish by the NEPA deadline, unless the Secretary grants an extension for extraordinary circumstances. ([p. 136, line 10 to p. 136, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=136))

## Key points

- Formal consultation: 60 days, not 90 ([p. 134, line 16 to p. 134, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=134))
- Consultation must end when the NEPA document is due, absent an extension for extraordinary circumstances ([p. 136, line 10 to p. 136, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=136))
- APA remedy after 145 days ([p. 135, line 23 to p. 135, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=135))

## What others say it would do

Outside readings, quoted from their sources. These are claims about effects, not findings of this tracker.

- **Rep. Jared Huffman** (Officials; opposes): The Senate bill's ESA provisions give away too much and Democrats should wait for a stronger position after the election.
  > He claimed the Senate version “concedes too much,” specifically regarding the Endangered Species Act.
  [Washington Examiner, 2026-10-01](https://www.washingtonexaminer.com/daily-on-energy/4750722/daily-on-energy-a-baaja-blast-for-data-centers/).
- **Bipartisan Policy Center** (Think tanks; explains): Applicants would gain a veto over consultation extensions at 100 days instead of 150.
  > giving applicants a veto over extensions 50 days earlier than current law
  [Bipartisan Policy Center, 2026-10-02](https://bipartisanpolicy.org/explainer/explaining-the-senate-permitting-bill-the-bipartisan-american-affordability-and-jobs-act). On the bill text at [p. 135, line 2 to p. 135, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=135).
- **Womble Bond Dickinson** (Lawyers and legal scholars; explains): The 90-to-60-day change does not create a hard 60-day deadline for a final biological opinion.
  > This would not establish an unconditional 60-day deadline for a final biological opinion.
  [Womble Bond Dickinson, 2026-10-02](https://www.womblebonddickinson.com/us/node/21451). On the bill text at [p. 134, line 20 to p. 134, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=134).

## Selected statutory quotes

> the consultation process under subsection (a)(2) shall be completed by not later than the date on which the applicable environmental document (as so defined) for the agency action is completed

[p. 136, line 4 to p. 136, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=136)

Consultation must end by the NEPA deadline.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

90 days. With an applicant involved, more than 150 days requires the applicant's consent.

### EPRA 2024 (reported S. 4753)

Not in EPRA 2024.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 134, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=134) (indent level 0)

Section 7(b)(1) of the Endangered Species Act of 1973 (16 U.S.C. 1536(b)(1)) is amended—

[p. 134, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=134) (indent level 2)

(1) in subparagraph (A), by striking “90-day” and inserting “60-day”;

[p. 134, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=134) (indent level 2)

(2) in subparagraph (B)—

[p. 134, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=134) (indent level 3)

(A) in the matter preceding clause (i)—

[p. 134, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=134) (indent level 4)

(i) by striking “90 days” and inserting “60 days”; and

[p. 134, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=134) (indent level 4)

(ii) by striking “90th day” and inserting “60th day”;

[p. 135, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=135) (indent level 3)

(B) in clause (i), in the matter preceding subclause (I), by striking “150th day” and inserting “100th day”;

[p. 135, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=135) (indent level 3)

(C) in clause (ii), by striking “150 or more” and inserting “100 or more”; and

[p. 135, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=135) (indent level 3)

(D) in the undesignated matter following clause (ii)—

[p. 135, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=135) (indent level 4)

(i) by striking “the preceding sentence” and inserting “subparagraph (B)”; and

[p. 135, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=135) (indent level 4)

(ii) by striking “The Secretary” and inserting the following:

[p. 135, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=135) (indent level 3)

“(C) The Secretary”; and

[p. 135, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=135) (indent level 2)

(3) by inserting after subparagraph (C) (as so designated) the following:

[p. 135, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=135) (indent level 3)

“(D) If the consultation period proposed to be agreed to between the Secretary and the Federal agency under subparagraph (B) extends beyond 145 days and the Secretary and the Federal agency have not provided a written statement to, or obtained consent from, a permit or license applicant under clause (i) or (ii), as applicable, of that subparagraph during such period, the applicant shall be eligible for relief under section 706(1) of title 5, United States Code.

[p. 136, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=136) (indent level 3)

“(E)(i) In the case of an agency action that requires the preparation of an environmental document (as defined in section 3 of the National Environmental Policy Act of 1969), the consultation process under subsection (a)(2) shall be completed by not later than the date on which the applicable environmental document (as so defined) for the agency action is completed in accordance with section 107(g) of the National Environmental Policy Act of 1969 (42 U.S.C. 4336a(g)), unless the Secretary approves an extension of the deadline due to extraordinary circumstances beyond the control, and not due to any action, of the consulting parties.

[p. 136, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=136) (indent level 4)

“(ii) The requirement under clause (i) shall not be construed to extend the deadlines described in subparagraphs (A) through (D).”.