# Sec. 1308. National Fish and Wildlife Foundation Coastal State Fund

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/1308)

## Summary

Creates a National Fish and Wildlife Foundation Coastal State Fund granting money to coastal states for coastal resource and natural infrastructure programs. ([p. 157, line 8 to p. 157, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=157)) The money is allocated 70 percent equally among coastal states and 15 percent by tidal shoreline. ([p. 157, line 17 to p. 157, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=157)) Another 15 percent is allocated by coastal population density, and no state gets more than 5 percent. ([p. 157, line 24 to p. 158, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=157)) Authorizes $50 million a year for fiscal years 2028 through 2032. ([p. 158, line 12 to p. 158, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=158))

## Key points

- $50 million a year to coastal states through NFWF ([p. 158, line 12 to p. 158, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=158))

## Selected statutory quotes

> not more than 5 percent of the total amounts allocated under that subsection may be allocated to any single coastal State

[p. 158, line 4 to p. 158, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=158)

No state may receive more than 5 percent.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

New.

### EPRA 2024 (reported S. 4753)

EPRA 2024 had offshore wind revenue-sharing provisions rather than a grant fund.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 156, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=156) (indent level 1)

(a) DEFINITIONS.—In this section:

[p. 156, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=156) (indent level 2)

(1) COASTAL COUNTY.—The term “coastal county” has the meaning given the term by the National Oceanic and Atmospheric Administration in the document entitled “NOAA’s List of Coastal Counties for the Bureau of the Census” (or a similar successor document).

[p. 156, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=156) (indent level 2)

(2) COASTAL STATE.—The term “coastal State” has the meaning given the term “coastal state” in section 304 of the Coastal Zone Management Act of 1972 (16 U.S.C. 1453).

[p. 156, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=156) (indent level 2)

(3) FOUNDATION.—The term “Foundation” means the National Fish and Wildlife Foundation established by section 2(a) of the National Fish and Wildlife Foundation Establishment Act (16 U.S.C. 3701(a)).

[p. 156, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=156) (indent level 2)

(4) PROGRAM.—The term “program” means the National Fish and Wildlife Foundation Coastal State Fund established under subsection (b).

[p. 156, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=156) (indent level 2)

(5) TIDAL SHORELINE.—The term “tidal shoreline” means the length of tidal shoreline or Great Lake shoreline based on the most recently available data from or accepted by the Office of Coast Survey of the National Oceanic and Atmospheric Administration.

[p. 157, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=157) (indent level 1)

(b) ESTABLISHMENT OF PROGRAM.—Not later than 1 year after the date of enactment of this Act, subject to the availability of appropriations, the Foundation shall establish and carry out a program, to be known as the “National Fish and Wildlife Foundation Coastal State Fund”, to award grants to coastal States to support State programs and activities intended to better understand and use coastal resources, coastal and natural infrastructure, and ecosystem services provided by natural systems.

[p. 157, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=157) (indent level 1)

(c) ALLOCATION OF AMOUNTS.—Of the amounts made available to carry out the program each fiscal year, subject to subsection (d), such amounts shall be allocated to grants for coastal States under the program in accordance with the following:

[p. 157, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=157) (indent level 2)

(1) 70 percent shall be allocated equally among coastal States.

[p. 157, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=157) (indent level 2)

(2) 15 percent shall be allocated on the basis of the ratio of tidal shoreline in a coastal State to the tidal shoreline of all coastal States.

[p. 157, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=157) (indent level 2)

(3) 15 percent shall be allocated on the basis of the ratio of population density of the coastal counties of a coastal State to the average population density of all coastal counties based on the most recent data available from the Bureau of the Census.

[p. 158, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=158) (indent level 1)

(d) LIMITATION FOR SINGLE COASTAL STATE.—Notwithstanding subsection (c), not more than 5 percent of the total amounts allocated under that subsection may be allocated to any single coastal State, and any amount exceeding that limitation shall be reallocated equally among the remaining coastal States.

[p. 158, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=158) (indent level 1)

(e) FUNDING.—

[p. 158, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=158) (indent level 2)

(1) AUTHORIZATION OF APPROPRIATIONS.— There is authorized to be appropriated to carry out the program $50,000,000 for each of fiscal years 2028 through 2032.

[p. 158, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=158) (indent level 2)

(2) ADDITIONAL FUNDING.—In addition to the amounts made available pursuant to paragraph (1), the Foundation may use such additional amounts as may be made available to carry out the program.

