# Sec. 2113. FERC fee assessments

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2113)

## Summary

Requires FERC to review every 5 years whether its fees and charges are enough to handle its workload promptly and report to Congress. ([p. 278, line 10 to p. 278, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=278))

## Key points

- Five-year FERC fee adequacy review ([p. 278, line 8 to p. 278, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=278))

## Selected statutory quotes

> are sufficient to allow the Federal Energy Regulatory Commission to handle its workload in an expedient manner

[p. 278, line 14 to p. 278, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=278)

The test FERC's fees must meet.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

New.

### EPRA 2024 (reported S. 4753)

Not in EPRA 2024.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 278, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=278) (indent level 0)

Part III of the Federal Power Act is amended by inserting after section 318 (as added by section 2106) the following:

[p. 278, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=278) (indent level 0)

“SEC. 318A. PERIODIC REVIEW OF FEES AND CHARGES.

[p. 278, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=278) (indent level 1)

“Not less frequently than once every 5 years, the Federal Energy Regulatory Commission shall—

[p. 278, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=278) (indent level 2)

“(1) undertake a review to determine whether the fees and charges the Federal Energy Regulatory Commission assesses under this Act and other laws, including section 3401 of the Omnibus Budget Reconciliation Act of 1986 (42 U.S.C. 7178), are sufficient to allow the Federal Energy Regulatory Commission to handle its workload in an expedient manner; and

[p. 278, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=278) (indent level 2)

“(2) submit to the Committee on Energy and Natural Resources of the Senate, the Committee on Energy and Commerce of the House of Representatives, the Committee on Appropriations of the Senate, and the Committee on Appropriations of the House of Representatives a report describing that review and the results of that review.”.

