# Sec. 2114. Collection of data on computational load entities

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2114)

## Summary

Directs the Energy Information Administration to revise Form 861 to collect electricity load from data center entities (AI, cloud, cryptocurrency) at least 90 days before the first April 1 after enactment. ([p. 279, line 21 to p. 279, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=279))

## Key points

- EIA's Form 861 must report data center load ([p. 279, line 24 to p. 279, line 25](https://pranava0x0.github.io/permittingreform/bill.pdf#page=279))

## What others say it would do

Outside readings, quoted from their sources. These are claims about effects, not findings of this tracker.

- **Institute for Progress** (Think tanks; supports): Section 2114 requires the Energy Information Administration to track electricity use by data centers, including cryptocurrency mining.
  > Section 2114 of BAAJA requires EIA to track electricity use by data centers, including any demand associated with cryptocurrency mining.
  [Institute for Progress, 2026-10-12](https://ifp.org/how-the-permit).

## Selected statutory quotes

> the Administrator of the Energy Information Administration shall revise Form 861 of the Energy Information Administration to include load from data center entities.

[p. 279, line 23 to p. 279, line 25](https://pranava0x0.github.io/permittingreform/bill.pdf#page=279)

EIA must collect data center load on Form 861.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

EIA does not break out data center load.

### EPRA 2024 (reported S. 4753)

Not in EPRA 2024.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 279, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=279) (indent level 1)

(a) DEFINITION OF DATA CENTER ENTITY.—

[p. 279, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=279) (indent level 2)

(1) IN GENERAL.—In this section, the term “data center entity” means an end-user, or group of co-located end-users, the primary purpose of which is to house computing, networking, or data storage equipment used to process, store, or transmit digital data, including equipment used for—

[p. 279, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=279) (indent level 3)

(A) artificial intelligence training or inference;

[p. 279, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=279) (indent level 3)

(B) cloud computing or data hosting; or

[p. 279, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=279) (indent level 3)

(C) cryptocurrency mining or other distributed-ledger or digital-asset computation.

[p. 279, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=279) (indent level 2)

(2) EXCLUSION.—In this section, the term “data center entity” does not include computing or data storage equipment that is ancillary to a facility the primary purpose of which is commercial or industrial activity other than an activity described in paragraph (1).

[p. 279, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=279) (indent level 1)

(b) DATA COLLECTION.—Not later than 90 days before the first April 1 after the date of enactment of this Act, the Administrator of the Energy Information Administration shall revise Form 861 of the Energy Information Administration to include load from data center entities.