# Sec. 2221. Geothermal observation test projects

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2221)

## Summary

Requires a categorical exclusion within 1 year for geothermal observation test wells on existing leases that disturb no more than 10 acres, use no permanent roads, and finish within a year. ([p. 324, line 17 to p. 324, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=324)) Casual-use activities need only 30 days' notice and are not major federal actions. ([p. 325, line 14 to p. 325, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=325))

## Key points

- Categorical exclusion for geothermal test wells up to 10 acres ([p. 324, line 17 to p. 324, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=324))

## Selected statutory quotes

> the Secretary concerned shall develop a categorical exclusion for geothermal observation test projects

[p. 324, line 18 to p. 324, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=324)

The exclusion for geothermal test wells.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

BLM adopted administrative geothermal exploration exclusions in 2024 and 2025; no statutory one.

### EPRA 2024 (reported S. 4753)

EPRA 2024 (sec. 208(a)) required a categorical exclusion for geothermal test activity under 10 acres within 180 days. This bill gives 1 year, defines the test projects in detail, and separately excludes them from NEPA as non-major actions (section 1102).

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 318, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=318) (indent level 0)

The Geothermal Steam Act of 1970 (30 U.S.C. 1001 et seq.) is amended by adding at the end the following:

[p. 318, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=318) (indent level 0)

“SEC. 30. GEOTHERMAL OBSERVATION TEST PROJECTS.

[p. 318, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=318) (indent level 1)

“(a) DEFINITIONS.—In this section:

[p. 318, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=318) (indent level 2)

“(1) CASUAL USE.—The term ‘casual use’, with respect to a geothermal observation test project, means activities ordinarily resulting in no or negligible disturbance of public land or resources.

[p. 318, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=318) (indent level 2)

“(2) CATEGORICAL EXCLUSION.—The term ‘categorical exclusion’ has the meaning given the term in section 3 of the National Environmental Policy Act of 1969.

[p. 319, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=319) (indent level 2)

“(3) DOWNHOLE.—The term ‘downhole’ means a well or borehole dug or drilled into the subsurface of the earth for the purposes of resource confirmation or potential use.

[p. 319, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=319) (indent level 2)

“(4) GEOTHERMAL OBSERVATION TEST PROJECT.—The term ‘geothermal observation test project’ means using geothermal technologies to drill a test, monitor, calibration, or other similar type of exploratory drilling process well for geothermal resources on land for which the Secretary concerned has issued a lease under this Act, that—

[p. 319, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=319) (indent level 3)

“(A) causes an allowable amount of total disturbance;

[p. 319, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=319) (indent level 3)

“(B) does not include any permanent roads;

[p. 319, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=319) (indent level 3)

“(C) is developed—

[p. 319, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=319) (indent level 4)

“(i) with the deepest cemented casing string less than 12 inches of downhole size in diameter;

[p. 319, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=319) (indent level 4)

“(ii) in a manner that does not require off-road motorized access other than to and from the well site along an identified off-road route;

[p. 319, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=319) (indent level 4)

“(iii) with temporary road access, if needed to enable access to the geothermal observation test project location, subject to the requirement that—

[p. 320, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=320) (indent level 5)

“(I) construction of the temporary road access is remediated as close as reasonably practicable to original condition following completion of the geothermal observation test project work; or

[p. 320, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=320) (indent level 5)

“(II) the temporary road access, with any additional permanent improvements, is included as part of the full review required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) if the leaseholder intends to proceed with geothermal energy use for—

[p. 320, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=320) (indent level 6)

“(aa) the production of electricity;

[p. 320, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=320) (indent level 6)

“(bb) industrial processes;

[p. 320, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=320) (indent level 6)

“(cc) agricultural processes;

[p. 320, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=320) (indent level 6)

“(dd) brine mineral extraction;

[p. 320, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=320) (indent level 6)

“(ee) direct heating and cooling uses; or

[p. 321, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=321) (indent level 6)

“(ff) any combination of items (aa) through (ee); and

[p. 321, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=321) (indent level 4)

“(iv) with the use of rubber-tired digging or drilling equipment vehicles;

[p. 321, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=321) (indent level 3)

“(D) is completed in less than 1 year—

[p. 321, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=321) (indent level 4)

“(i) including the removal of any surface infrastructure from the site, unless—

[p. 321, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=321) (indent level 5)

“(I) the party conducting the geothermal observation test project submits to the Secretary concerned by not later than 60 days after the date of first exploration drilling an extension request for additional time to complete the observation project, in which the request provides justification indicating why granting an extension is necessary; and

[p. 321, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=321) (indent level 5)

“(II) the Secretary concerned grants an extension under subclause (I), if requested; or

[p. 321, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=321) (indent level 4)

“(ii) not including removal of any surface infrastructure from the site so long as the geothermal developer intends to proceed with resource development directly following the test phase of the project and into processes required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and

[p. 322, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=322) (indent level 3)

“(E) requires the restoration of the project site as part of any new review required under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) within 3 years of the date of first exploration drilling to approximately the condition that existed at the time the project began, unless the site is subsequently used as part of energy development under the lease.

[p. 322, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=322) (indent level 2)

“(5) GEOTHERMAL TECHNOLOGY.—The term ‘geothermal technology’ means technology designed to extract heat from the subsurface of the earth and that is used to drill—

[p. 322, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=322) (indent level 3)

“(A) hydrothermal project test wells;

[p. 322, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=322) (indent level 3)

“(B) enhanced geothermal system monitoring wells;

[p. 322, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=322) (indent level 3)

“(C) closed loop geothermal system calibration wells; and

[p. 322, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=322) (indent level 3)

“(D) similar types of subsurface disturbances through non-production wells to assess the viability of the heat resources of the earth.

[p. 323, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=323) (indent level 2)

“(6) SECRETARY CONCERNED.—The term ‘Secretary concerned’ means—

[p. 323, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=323) (indent level 3)

“(A) the Secretary of Agriculture, with respect to National Forest System land; and

[p. 323, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=323) (indent level 3)

“(B) the Secretary, with respect to public lands.

[p. 323, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=323) (indent level 2)

“(7) SURFACE INFRASTRUCTURE.—The term ‘surface infrastructure’ means all equipment, materials, facilities, and other items used in the drilling of a geothermal observation test project.

[p. 323, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=323) (indent level 2)

“(8) TOTAL DISTURBANCE.—

[p. 323, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=323) (indent level 3)

“(A) IN GENERAL.—The term ‘total disturbance’ means a geothermal observation test project that causes not more than 10 acres of disturbance from—

[p. 323, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=323) (indent level 4)

“(i) soil or vegetation disruption at the location of each geothermal observation test project; and

[p. 323, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=323) (indent level 4)

“(ii) soil or vegetation disruption during access or egress to the geothermal observation test project site.

[p. 323, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=323) (indent level 3)

“(B) ALLOWANCE.—

[p. 323, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=323) (indent level 4)

“(i) MULTIPLE PROJECTS.—For instances of multiple geothermal observation test projects, the acres of total disturbance allowed shall—

[p. 324, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=324) (indent level 5)

“(I) be equal to the total number of geothermal observation test projects multiplied by 10 acres; and

[p. 324, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=324) (indent level 5)

“(II) not exceed 100 total acres.

[p. 324, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=324) (indent level 4)

“(ii) ACCESS OR EGRESS.—For soil or vegetation disruption during access or egress to a geothermal observation test project site, the acres of total soil or vegetation disruption allowed shall be equal to the acres of total disturbance allowed minus the acres of soil or vegetation disruption caused by the geothermal observation test project.

[p. 324, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=324) (indent level 1)

“(b) CATEGORICAL EXCLUSION.—

[p. 324, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=324) (indent level 2)

“(1) IN GENERAL.—Not later than 1 year after the date of enactment of this section, the Secretary concerned shall develop a categorical exclusion for geothermal observation test projects.

[p. 324, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=324) (indent level 2)

“(2) ADMINISTRATION.—In developing and administering the categorical exclusion under paragraph (1), the Secretary concerned shall—

[p. 325, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=325) (indent level 3)

“(A) comply with the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.); and

[p. 325, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=325) (indent level 3)

“(B) apply any applicable extraordinary circumstance under section 46.215 of title 43, Code of Federal Regulations (or a successor regulation), in determining whether to use the categorical exclusion.

[p. 325, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=325) (indent level 1)

“(c) NON-MAJOR FEDERAL ACTION.—

[p. 325, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=325) (indent level 2)

“(1) IN GENERAL.—Activities that are casual use shall not be considered a major Federal action under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).

[p. 325, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=325) (indent level 2)

“(2) NOTICE OF INTENT.—A party wishing to conduct activities that are casual use shall provide to the Secretary a notice of intent to carry out those activities at least 30 days before the start of the activities.”.