# Sec. 2222. Geothermal royalties

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2222)

## Summary

Calculates the reduced early-years geothermal royalty per generating facility, starting from each facility's in-service date, so a second plant on an old lease gets its own 10-year lower-royalty period. ([p. 328, line 22 to p. 328, line 25](https://pranava0x0.github.io/permittingreform/bill.pdf#page=328))

## Key points

- Royalty step-up clock runs per power plant, not per lease ([p. 328, line 22 to p. 328, line 25](https://pranava0x0.github.io/permittingreform/bill.pdf#page=328))

## Selected statutory quotes

> each year of the 10-year period following the in-service date of the geothermal electric generating facility

[p. 328, line 22 to p. 328, line 25](https://pranava0x0.github.io/permittingreform/bill.pdf#page=328)

The lower royalty period runs from each plant's in-service date.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

The lower royalty applies to the first 10 years of production under the lease.

### EPRA 2024 (reported S. 4753)

Not in EPRA 2024 as reported.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 325, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=325) (indent level 1)

(a) DEFINITIONS.—

[p. 325, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=325) (indent level 2)

(1) IN GENERAL.—Section 2 of the Geothermal Steam Act of 1970 (30 U.S.C. 1001) is amended—

[p. 325, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=325) (indent level 3)

(A) in the matter preceding subsection (a), by striking “As used in this Act, the term—” and inserting “In this Act:”;

[p. 326, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=326) (indent level 3)

(B) in each of subsections (a) through (d), by striking the semicolon at the end and inserting a period;

[p. 326, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=326) (indent level 3)

(C) in subsection (e), by striking “geothermal steam or associated”;

[p. 326, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=326) (indent level 3)

(D) in subsection (f)—

[p. 326, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=326) (indent level 4)

(i) in the matter preceding paragraph (1), by striking “Significant” and inserting “significant”; and

[p. 326, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=326) (indent level 4)

(ii) by redesignating paragraphs (1) through (4) as subparagraphs (A) through (D), respectively, and indenting appropriately;

[p. 326, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=326) (indent level 3)

(E) in subsection (g), by striking “; and” and inserting a period;

[p. 326, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=326) (indent level 3)

(F) by redesignating subsections (a) through (g) as paragraphs (8), (4), (5), (1), (7), (9), and (2), respectively, and indenting and moving the paragraphs so as to appear in numerical order;

[p. 326, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=326) (indent level 3)

(G) in each of paragraphs (1), (2), (4), (5), (7), (8), and (9)—

[p. 326, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=326) (indent level 4)

(i) by inserting “The term” after the paragraph designation; and

[p. 327, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=327) (indent level 4)

(ii) by inserting a paragraph heading, the text of which comprises the term defined in that paragraph;

[p. 327, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=327) (indent level 3)

(H) by inserting after paragraph (2) (as so redesignated) the following:

[p. 327, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=327) (indent level 2)

“(3) GEOTHERMAL ELECTRIC GENERATING FACILITY.—

[p. 327, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=327) (indent level 3)

“(A) IN GENERAL.—The term ‘geothermal electric generating facility’ means a facility, including all necessary equipment or structures (including turbines, cooling equipment, and other equipment), that converts geothermal resources into electricity.

[p. 327, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=327) (indent level 3)

“(B) SEPARATE FACILITIES.—A plant or site of a facility described in subparagraph (A) shall be considered a new or separate facility from the facility described in subparagraph (A) only if no turbines are shared with that existing facility.”; and

[p. 327, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=327) (indent level 5)

(I) by inserting after paragraph (5) (as so redesignated) the following:

[p. 327, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=327) (indent level 2)

“(6) IN-SERVICE DATE.—The term ‘in-service date’, with respect to a geothermal electric generating facility, means the date on which the geothermal electric generating facility begins operating.”.

[p. 328, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=328) (indent level 2)

(2) CONFORMING AMENDMENTS.—

[p. 328, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=328) (indent level 3)

(A) Section 6(i) of the Geothermal Steam Act of 1970 (30 U.S.C. 1005(i)) is amended by striking “as defined in section 2(c) herein”.

[p. 328, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=328) (indent level 3)

(B) Section 28(a)(1) of the Geothermal Steam Act of 1970 (30 U.S.C. 1026(a)(1)) is amended in the matter preceding subparagraph (A) by striking “, as defined in section 2(f),”.

[p. 328, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=328) (indent level 1)

(b) GEOTHERMAL ROYALTIES.—Section 5(a)(1) of the Geothermal Steam Act of 1970 (30 U.S.C. 1004(a)(1)) is amended—

[p. 328, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=328) (indent level 2)

(1) in subparagraph (A)—

[p. 328, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=328) (indent level 3)

(A) by inserting “with respect to a geothermal electric generating facility producing electricity from geothermal resources,” before “not less than”;

[p. 328, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=328) (indent level 3)

(B) by inserting “by such facility” after “produced”; and

[p. 328, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=328) (indent level 3)

(C) by striking “the first 10 years of production under the lease” and inserting “each year of the 10-year period following the in-service date of the geothermal electric generating facility”; and

[p. 329, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=329) (indent level 2)

(2) in subparagraph (B)—

[p. 329, line 2](https://pranava0x0.github.io/permittingreform/bill.pdf#page=329) (indent level 3)

(A) by inserting “with respect to a geothermal electric generating facility producing electricity from geothermal resources,” before “not less than”;

[p. 329, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=329) (indent level 3)

(B) by inserting “by such facility” after “produced”; and

[p. 329, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=329) (indent level 3)

(C) by striking “such 10-year period” and inserting “the 10-year period described in subparagraph (A)”.