# Sec. 2229. NEPA Review

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2229)

## Summary

Rewrites section 390 of the Energy Policy Act of 2005. ([p. 349, line 2 to p. 349, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=349)) The oil and gas activities listed in section 390(b) of the Energy Policy Act of 2005 are declared not to be major federal actions at all, rather than categorical exclusions. ([p. 349, line 9 to p. 349, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=349)) Geothermal is added to two of them, and a new item covers geothermal power lines of up to 20 miles in a corridor approved within the past 10 years. ([p. 350, line 7 to p. 350, line 11](https://pranava0x0.github.io/permittingreform/bill.pdf#page=350)) One listed item's look-back goes from 5 to 10 years, and geothermal gets a new item for power lines up to 20 miles in a corridor approved within 10 years. ([p. 350, line 1 to p. 350, line 2](https://pranava0x0.github.io/permittingreform/bill.pdf#page=350)) Drilling permits for these activities carry no NEPA requirements. ([p. 351, line 6 to p. 351, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=351))

## Key points

- Section 390 oil, gas and now geothermal activities are outside NEPA entirely ([p. 349, line 9 to p. 349, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=349))
- Drilling permits for those activities 'shall not have any requirements' under NEPA ([p. 351, line 6 to p. 351, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=351))

## Selected statutory quotes

> shall not be considered a major Federal action under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) if the activity is conducted pursuant to the Mineral Leasing Act (30 U.S.C. 181 et seq.) or the Geothermal Steam Act of 1970 (30 U.S.C. 1001 et seq.) for the purpose of exploration or development of oil, gas, or geothermal resources.

[p. 349, line 9 to p. 349, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=349)

Routine oil, gas and geothermal activities are declared not to be major federal actions.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

Section 390 creates a rebuttable presumption that a categorical exclusion applies to five oil and gas activities; extraordinary circumstances review has been contested.

### EPRA 2024 (reported S. 4753)

EPRA 2024 (sec. 208(f)) extended the section 390 categorical exclusions to geothermal. Declaring the activities not major federal actions, and stripping NEPA from the drilling permits, goes further and applies to oil and gas as well.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 349, line 2](https://pranava0x0.github.io/permittingreform/bill.pdf#page=349) (indent level 0)

Section 390 of the Energy Policy Act of 2005 (42 U.S.C. 15942) is amended—

[p. 349, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=349) (indent level 2)

(1) by striking subsection (a) and inserting the following:

[p. 349, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=349) (indent level 1)

“(a) NEPA REVIEW.—Action by the Secretary of the Interior in managing public land, or the Secretary of Agriculture in managing National Forest System land, with respect to an activity described in subsection (b) shall not be considered a major Federal action under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) if the activity is conducted pursuant to the Mineral Leasing Act (30 U.S.C. 181 et seq.) or the Geothermal Steam Act of 1970 (30 U.S.C. 1001 et seq.) for the purpose of exploration or development of oil, gas, or geothermal resources.”;

[p. 349, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=349) (indent level 2)

(2) in subsection (b)—

[p. 349, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=349) (indent level 3)

(A) in paragraph (2), by striking “or gas” and inserting “, gas, or geothermal”;

[p. 349, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=349) (indent level 3)

(B) in paragraph (3), by striking “or gas” and inserting “, gas, or geothermal”;

[p. 349, line 22](https://pranava0x0.github.io/permittingreform/bill.pdf#page=349) (indent level 3)

(C) by striking “NEPA” each place it appears and inserting “the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.)”;

[p. 350, line 1](https://pranava0x0.github.io/permittingreform/bill.pdf#page=350) (indent level 3)

(D) in paragraph (4), by striking “5” and inserting “10”;

[p. 350, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=350) (indent level 3)

(E) by redesignating paragraph (5) as paragraph (6); and

[p. 350, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=350) (indent level 3)

(F) by inserting after paragraph (4) the following:

[p. 350, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=350) (indent level 2)

“(5) For the purposes of geothermal, placement of an electric transmission or distribution line of not more than 20 miles in length in an approved right-of-way corridor, so long as the corridor was approved within 10 years prior to the date of placement of the transmission or distribution line.”; and

[p. 350, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=350) (indent level 2)

(3) by adding at the end the following:

[p. 350, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=350) (indent level 1)

“(c) EFFECT.—

[p. 350, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=350) (indent level 2)

“(1) IN GENERAL.—Nothing in this section affects the requirement for a drilling permit for the conduct of any activity described in subsection (b) pursuant to—

[p. 350, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=350) (indent level 3)

“(A) the Mineral Leasing Act (30 U.S.C. 181 et seq.); or

[p. 350, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=350) (indent level 3)

“(B) the Geothermal Steam Act of 1970 (30 U.S.C. 1001 et seq.).

[p. 350, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=350) (indent level 2)

“(2) REQUIREMENTS.—Notwithstanding section 17(p)(2)(A) of the Mineral Leasing Act (30 U.S.C. 226(p)(2)(A)) or subsection (h)(2)(A)(i) of section 4 of the Geothermal Steam Act of 1970 (30 U.S.C. 1003), activities described in subsection (b) that require a drilling permit under the Mineral Leasing Act (30 U.S.C. 1001 et seq.) or a geothermal drilling permit under the Geothermal Steam Act of 1970 (30 U.S.C. 1001 et seq.) shall not have any requirements under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).”.

