# Sec. 2231. Identifying and removing market barriers to hydropower

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2231)

## Summary

FERC, with the Energy Department, reports to Congress within 270 days on market barriers to hydropower and pumped storage. ([p. 351, line 17 to p. 351, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=351)) The report also covers how to pay hydropower for the grid services it provides. ([p. 352, line 23 to p. 353, line 2](https://pranava0x0.github.io/permittingreform/bill.pdf#page=352)) FERC prepares the report after a technical conference and public comment. ([p. 354, line 1 to p. 354, line 4](https://pranava0x0.github.io/permittingreform/bill.pdf#page=354))

## Key points

- FERC report on hydropower market barriers ([p. 351, line 17 to p. 351, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=351))

## Selected statutory quotes

> properly compensate conventional, storage, conduit, and emerging hydropower technologies for the full range of services provided to the electric grid

[p. 352, line 23 to p. 353, line 2](https://pranava0x0.github.io/permittingreform/bill.pdf#page=352)

The report must address how hydropower is paid for grid services.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

New.

### EPRA 2024 (reported S. 4753)

Carried over from EPRA 2024 (sec. 702). EPRA's hydropower license extensions (sec. 701) and its rule aligning licensing timetables (sec. 703) are not in this bill.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 351, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=351) (indent level 1)

(a) DEFINITION OF COMMISSION.—In this section, the term “Commission” means the Federal Energy Regulatory Commission.

[p. 351, line 15](https://pranava0x0.github.io/permittingreform/bill.pdf#page=351) (indent level 1)

(b) REPORT ON HYDROPOWER MARKET BARRIERS.—

[p. 351, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=351) (indent level 2)

(1) IN GENERAL.—Not later than 270 days after the date of enactment of this Act, the Commission, in consultation with the Secretary of Energy, shall submit to the Committee on Energy and Natural Resources of the Senate and the Committee on Energy and Commerce of the House of Representatives a report—

[p. 351, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=351) (indent level 3)

(A) describing any market barriers to the development and proper compensation of conventional, storage, conduit, and emerging hydropower technologies related to—

[p. 352, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=352) (indent level 4)

(i) rules of Transmission Organizations (as defined in section 3 of the Federal Power Act (16 U.S.C. 796));

[p. 352, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=352) (indent level 4)

(ii) regulations or policies—

[p. 352, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=352) (indent level 5)

(I) of the Commission; or

[p. 352, line 8](https://pranava0x0.github.io/permittingreform/bill.pdf#page=352) (indent level 5)

(II) under the Federal Power Act (16 U.S.C. 791a et seq.); or

[p. 352, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=352) (indent level 4)

(iii) other Federal and State laws and policies unique to hydropower development, operation, and regulation, as compared to other sources of electricity;

[p. 352, line 14](https://pranava0x0.github.io/permittingreform/bill.pdf#page=352) (indent level 3)

(B) containing recommendations of the Commission for reducing market barriers described in subparagraph (A);

[p. 352, line 17](https://pranava0x0.github.io/permittingreform/bill.pdf#page=352) (indent level 3)

(C) identifying and determining any regulatory, market, procurement, or cost recovery mechanisms that would—

[p. 352, line 20](https://pranava0x0.github.io/permittingreform/bill.pdf#page=352) (indent level 4)

(i) encourage development of conventional, storage, conduit, and emerging hydropower technologies; and

[p. 352, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=352) (indent level 4)

(ii) properly compensate conventional, storage, conduit, and emerging hydropower technologies for the full range of services provided to the electric grid, including—

[p. 353, line 3](https://pranava0x0.github.io/permittingreform/bill.pdf#page=353) (indent level 5)

(I) balancing electricity supply and demand;

[p. 353, line 5](https://pranava0x0.github.io/permittingreform/bill.pdf#page=353) (indent level 5)

(II) ensuring grid reliability;

[p. 353, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=353) (indent level 5)

(III) providing ancillary services;

[p. 353, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=353) (indent level 5)

(IV) contributing to the decarbonization of the electric grid; and

[p. 353, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=353) (indent level 5)

(V) integrating intermittent power sources into the grid in a cost-effective manner; and

[p. 353, line 13](https://pranava0x0.github.io/permittingreform/bill.pdf#page=353) (indent level 3)

(D) identifying ownership and development models that could reduce market barriers to the development of conventional, storage, conduit, and emerging hydropower technologies, including—

[p. 353, line 18](https://pranava0x0.github.io/permittingreform/bill.pdf#page=353) (indent level 4)

(i) opportunities for risk-sharing mechanisms and partnerships, including co-ownership models; and

[p. 353, line 21](https://pranava0x0.github.io/permittingreform/bill.pdf#page=353) (indent level 4)

(ii) opportunities to foster lease-sale and lease-back arrangements with publicly owned electric utilities.

[p. 353, line 24](https://pranava0x0.github.io/permittingreform/bill.pdf#page=353) (indent level 2)

(2) TECHNICAL CONFERENCE AND PUBLIC COMMENT.—In preparing the report under paragraph (1), the Commission shall solicit public input, including by convening a technical conference and providing an opportunity for public submission of written comments on a draft report.

