# Sec. 2232. Certain conditions on issuance of licenses

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2232)

## Summary

Limits the mandatory conditions federal land agencies can attach to a hydropower license under Federal Power Act section 4(e) to those 'reasonably related to the effects of the project'. ([p. 354, line 8 to p. 354, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=354))

## Key points

- Mandatory license conditions must relate to project effects ([p. 354, line 8 to p. 354, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=354))

## Selected statutory quotes

> by inserting “and are reasonably related to the effects of the project” after “of such reservation”.

[p. 354, line 8 to p. 354, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=354)

Mandatory license conditions must relate to the project's effects.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

The department that manages a federal reservation, including Interior for Indian reservations, can impose any condition it deems necessary to protect the reservation and its use.

### EPRA 2024 (reported S. 4753)

Not in EPRA 2024.

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 354, line 7](https://pranava0x0.github.io/permittingreform/bill.pdf#page=354) (indent level 0)

Section 4(e) of the Federal Power Act (16 U.S.C. 797(e)) is amended, in the first proviso, by inserting “and are reasonably related to the effects of the project” after “of such reservation”.

