# Sec. 2241. Federal Energy Regulatory Commission staffing

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2241)

## Summary

Widens FERC's special pay authority to economic and legal positions and strikes paragraph (6) of the same subsection. ([p. 362, line 14 to p. 362, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=362))

## Key points

- FERC can use special pay rates for economists and lawyers ([p. 362, line 14 to p. 362, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=362))

## Selected statutory quotes

> by striking “or mathematical” and inserting “mathematical, economic, or legal”

[p. 362, line 14 to p. 362, line 16](https://pranava0x0.github.io/permittingreform/bill.pdf#page=362)

Adds economists and lawyers to FERC's special hiring authority.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

The authority covers scientific, technological, engineering and mathematical positions, and the FERC Chairman must consult the Office of Personnel Management when setting pay.

### EPRA 2024 (reported S. 4753)

Carried over from EPRA 2024 (sec. 801).

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 362, line 6](https://pranava0x0.github.io/permittingreform/bill.pdf#page=362) (indent level 1)

(a) CONSULTATION REQUIREMENT.—Section 401(k) of the Department of Energy Organization Act (42 U.S.C. 7171(k)) is amended—

[p. 362, line 9](https://pranava0x0.github.io/permittingreform/bill.pdf#page=362) (indent level 2)

(1) by striking paragraph (6); and

[p. 362, line 10](https://pranava0x0.github.io/permittingreform/bill.pdf#page=362) (indent level 2)

(2) by redesignating paragraph (7) as paragraph (6).

[p. 362, line 12](https://pranava0x0.github.io/permittingreform/bill.pdf#page=362) (indent level 1)

(b) CERTIFICATION REQUIREMENTS.—Section 401(k)(2)(A) of the Department of Energy Organization Act (42 U.S.C. 7171(k)(2)(A)) is amended by striking “or mathematical” and inserting “mathematical, economic, or legal”.

