# Sec. 2242. Northwest Power and Conservation Council

BAAJA draft released September 30, 2026. AI-assisted analysis; proposed changes.

Saved AI review: 794 supported, 0 flagged, 18 unchecked of 812 statements; checked 2026-10-06; stale: true. Coverage excludes current-law comparison cells and some research paraphrases. Read data/core.json checks for link and quote results and their dates. A stale review does not verify the current wording.

[Official PDF](https://www.epw.senate.gov/public/_cache/files/5/c/5c5f5935-b224-48e7-abea-e60c30e7a4cf/7935BF3C85967B6F56F6F4858FD3221B7E0AEB02D04BE391CAFBD1B884CE3DC5.bipartisan-american-affordability-and-jobs-act-text.pdf) · [Browser section](https://pranava0x0.github.io/permittingreform/#/bill/sec/2242)

## Summary

Amends the cap on Bonneville's funding of the Northwest Power and Conservation Council, section 4(c)(10)(B) of the Northwest Power Act, by adding the words 'since the date of enactment' of this bill. ([p. 362, line 21 to p. 362, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=362))

## Key points

- Technical change to the funding cap for the Northwest Power and Conservation Council ([p. 362, line 21 to p. 362, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=362))

## Selected statutory quotes

> since the date of enactment of the Bipartisan American Affordability and Jobs Act of 2026

[p. 362, line 21 to p. 362, line 23](https://pranava0x0.github.io/permittingreform/bill.pdf#page=362)

The words added to the Council's funding cap.

## Comparison notes

- [SPEED Act (H.R. 4776), engrossed in House](https://www.govinfo.gov/content/pkg/BILLS-119hr4776eh/html/BILLS-119hr4776eh.htm)
- [Energy Permitting Reform Act of 2024 (S. 4753), reported in Senate](https://www.govinfo.gov/content/pkg/BILLS-118s4753rs/html/BILLS-118s4753rs.htm)

### Current law

Bonneville may fund the Council up to 0.10 mill for each kilowatt-hour of firm power it forecasts selling that year.

### EPRA 2024 (reported S. 4753)

Carried over from EPRA 2024 (sec. 803).

### SPEED Act (House-passed H.R. 4776)

Not in the SPEED Act.

## Full statutory text

Extracted from the official PDF; line cites mark paragraph starts. Consult the PDF for exact layout.

[p. 362, line 19](https://pranava0x0.github.io/permittingreform/bill.pdf#page=362) (indent level 0)

Section 4(c)(10)(B) of the Pacific Northwest Electric Power Planning and Conservation Act (16 U.S.C. 839b(c)(10)(B)) is amended by inserting “since the date of enactment of the Bipartisan American Affordability and Jobs Act of 2026” before the period at the end.

